Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
AH Summary 09-27-2018
To: From: Date: Subj: 1. OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE o CUPERTINO, CA 95014-3255 (408) 777-3308 o FAX (408) 777-3333 o plan ning(d)cupertino.org Mayor and City Council Members Planning Commissioners Benjamin Fu, Assist. Director of Community Development October 1, 2018 REPORT OF ADMINISTRATIVE HEARING DECISION MADE September 27, 2018 Chapter 19.112.170 of the Cupertino Municipal code provides for Appeal of decisions made at an Administrative Hearing Application ASA -2017-06, Hanna Smolich (Gu/Ming residence), 22861 Medina Ln Description Architectural and Site approval to allow a 1,002 square foot addition to one side of a duplex located in an R2 Zone Action The application was approved at the Administrative Hearing. The approval is effective September 27, 2018. The fourteen -calendar day appeal will expire on October 11, 2018. Enclosures: Administrative Hearing Report of September 27, 2018 Resolution No(s) 95 Plan set 2. Application DP -2018-06, ASA -2018-07, West Valley Community Services (SCC Central Fire Protection District), 10104 Vista Dr Description Development Permit and an Architectural and Site approval to allow a 1,016 square foot second floor to an existing office building Action The application was approved at the Administrative Hearing. The approval is effective September 27, 2018. The fourteen -calendar day appeal will expire on October 11, 2018. Enclosures: Administrative Hearing Report of September 27, 2018 Resolution No(s) 96 & 97 Plan set CUPEKTiNQ OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE e CUPERTINO, CA 95014-3255 (408) 777-3308 - FAX (408) 777-3333 e plamdng@cupertino.or�z ADMINISTRATIVE HEARING STAFF REPORT Agenda Date: September 27, 2018 Subject Architectural and Site Approval to consider allowing a 1,161 square foot first floor and 326 square feet second floor addition to an existing duplex; (Application No.: ASA -2017- 06;, Applicant: Susan Chen; Location 22861 Medina Lane; APN(s): 342-30-013) Recommended Action That the Hearing Officer adopt the draft resolution to: 1. Approve the Architectural and Site Approval application (Attachment 1.) Discussion Project Data: #eeaD'PflPflaag�r y Inspiration Heights Neighborhood �e�eraIl Pfl Des�gnaIl®� Low Density / Medium Density (5-10 DU/Ac.) x `£K R2-4.25 10 ®IlrDgm�tIlaIlI mr 8DU/acre 8 DU/acre (no change)` ensIl 10,937 square feet (0.25 acres) 01, 2,804 sf Lot (maxR40%) 4,375 sf 3,862 sf (35.3%) Coverage f Y (25.6%)/ f t `Y ^' E �� p^Fh iY „ `"ri ,Y -'•,, }i f � � Y t �'i }a��'� 1",y ^r� .F �u � Fk `b�. �"7'•sc.42 t y N Pronf 20' 15,10" No Change '# Rear �(gYeater��of�20'� or �20%k of r 20' 22'10" 18'6" the lot deth) IZegtured useablerear yard 1`f t Y proposed rear setback 20 ono 113'4" x 20' = 2`266 feet but$ Less thanl0 feet - 2,455 sq. ft. , sq. ft. Cgr`eateY of�850 sq `eft or 20 times ASA -2017-06 22861 Medina Lane September 27, 2018 PaLye 2 of 6 Site Development Allowed/Required`' Existing Proposed Side: (20% of lot width measured at front setback line and no side less than sixfeet) 23' combined and no side less than six feet Left: 22'1" No change Right: 11'1" Right: 8'0" 2nd Floor Setbacks Front 20' 19'10" No change Rear: (20% of lot depth) 20' 45'4" 2411" Sider (At least three feet more than first floor setback) Left: 22'1"+3'= 25'1" Left: 58'11 No change Right: 8'+ 3' =11' Right: 11'1" Right: 20'11" Total Building Height 28' 2314" No change Consistency General Plan Yes Zoning Yes Background: Site Description The applicant, Susan Chen, representing the property owner, Haisong Gu, is proposing a first and second floor addition to an existing duplex (see plan set — Attachment 2). The 10,937 square foot flag -lot is located at the intersection of Medina Lane and El Prado Way. The neighboring uses are residential and open space. To the north of the property is development consisting of attached townhomes. To the east and south of the property along Medina Lane and El Pardo Way are other duplexes. Directly west of the property is a private open space parcel associated with a residential planned development. ASA -2017-06 22861 Medina Lane September 27, 2018 Paze 3 of 6 Currently, the existing two -unit duplex has an a total area of 3,544 square feet with one unit measuring 1,625 square feet and a second unit measuring 922 square feet. The duplex includes an 871 square foot garage and 136 square feet of storage area. Analysis: Conformance with General Plan and Zoning The proposed project is consistent with the General Plan Land Use Designation of Low/Medium Density, (5-10 units/acre) which allows a maximum of two (2) dwelling units based on the net lot area, and zoning designation of Residential Duplex (R-2) zone. Architectural and Site Approval The project will add 1,487 square feet on both floors of an existing two-story duplex. The floor area of the smaller unit will increase from 922 square feet to 2,409 square feet, with 1,161 square feet added to the first floor and 326 square feet added as a second floor loft. The lot coverage on site will increase from 25.6% to 35.3% and the floor area will increase from 32.5%o to 44.8%. Access to this unit will continue to be provided via an existing. exterior staircase located on the eastern elevation. In addition, the applicant proposes a new entry feature between the duplexes. No changes are proposed to the parking on site. Duplex properties are required to provide three (3) parking spaces per dwelling unit (1.5 open and 1.5 enclosed.) In this instance, the project continues to meet this requirement by provided three (3) parking spaces within the existing garage, and three (3) exterior parking spaces for a total of six (6). The architecture and material of the proposed addition are designed to match the existing home. This has been accomplished by maintaining a similar building form, roof lines, and window treatments. Additionally, exterior finishes of the addition will be consistent with regard to stucco, roofing material, and windows. The addition will not change the overall height of the existing two-story duplex. The applicant also proposes to make certain site improvements such as the additionof a new hot tub' on the northwest corner of the property and a new paver walkway located adjacent to the rear of the buildings. Geologic, Hazard Zone The property is located with a Fault -Rupture Zone. Consistent with the City's requirements, a Geotechnical Report was submitted to the City for review.. The report was peer reviewed by the City's Geotechnical Consultant who made recommendations ASA -2017-06 22861 Medina Lane September 27, 2018 Page 4 of 6 to ensure geotechnical safety for the proposed project. These have been incorporated as conditions of approval. Other Department/Agency Review The City's Public Works Department and Building Division have reviewed the project and have no objections. Their conditions have been incorporated as conditions of approval in the draft resolution. Public Noticing and Outreach The following table is a brief summary of the noticing done for this project: Notice of Public Meeting, Site Signage, & Legal Ad Agenda ■ One site sign posted on the site (at least 10 days ■ Posted on the City's official prior to hearing) notice bulletin board (one ■ Legal ad placed in the newspaper (at least 10 week prior to hearing) days prior to hearing) ■ Posted on the City of ■ 11 notices mailed to adjacent property owners Cupertino's Web site (one (10 days prior to hearing) week prior to hearing) As of the production of this report, staff has received comments from two neighboring residents — one written (see Attachment 3) and one verbal. Their concerns and Staff responses are summarized below: ■ Construction activities (specifically noise) will be an impact to the neighboring residents. Cupertino Municipal Code (CMC) Chapter 10.48 Community Noise Control limits the hours of construction activities. CMC Section 10.48.053 restricts the amount of noise that may be generated by construction. Any violation of the City's ordinance would be considered a code violation and subject to enforcement by the City's Code Enforcement Division. ■ HVAC System may create unwanted noise. CMC Chapter 10.48: Community Noise Control limits the amount of noise that is allowed to be generated. For residential areas, the maximum noise level at the complaint site is 50 dBA in the nighttime and 60 dBA in the daytime. Any HVAC system installed is required to meet these requirement. Failure to be consistent with the City's ordinance would be considered a code violation and subject to enforcement by the City's Code Enforcement Division. ■ The project will create privacy impacts. The project proposes the addition of 326 square feet to an existing second story with windows with sills at four (4) feet above the ground floor. The City's Municipal Code does not require properties zoned ASA -2017-06 22861 Medina Lane September 27, 2018 Page 5 of 6 Residential Duplex (R-2) to implement privacy mitigation measures; therefore, no privacy mitigation measures have been required for this project. However, views into adjacent properties are currently obscured by existing cypress trees on the project site, and existing trees on the adjacent properties. It should be noted that there are existing two-story townhomes (with rear windows overlooking the subject property) along the northern property line whose views are similarly obscured by the existing trees. ® Concerns over a change of the fence. The applicant has not proposed any changes to the existing fence. Any change to the fence will require additional Planning review. ® Concerns over impacts on views of open space. The City's Municipal Code does not require projects on Residential Duplex Zoned (R-2) properties to prevent impacts to views for adjacent properties. Permit Streamlining Act: This matter is adjudicatory and is- subject to the Permit Streamlining Act (Government Code Section 65920 — 65964). The City has complied with the deadlines found in the r Permit Streamlining Act. Deemed Incomplete: January 16, 2017, May 30, 2017, October 2, 2017, January 16, 2®17 March 28, 2018, and July 16, 201 Deemed Complete: August 16, 2018 The City had 60 days, until, October 15, 2018 to make a decision on the project. Environmental Review This project is categorically exempt from the requirements of the California Environmental Quality Act (CE®A) per Section 15301(e) — Existing Facilities because the exemption applies to the addition of up to 10,000 sq. ft. in an area where all public services and facilities are available to allow for maximum development permissible in the General Plan and the project is not located in an environmentally sensitive area. Conclusion: Staff recommends approval of the Architectural and Site Approval because the project is consistent with the General Plan and zoning ordinance, in accordance with Chapter 19.32. Next Steps: The Hearing Officer's decision on this project is final unless appealed within 14 calendar days of the decision. ASA -2017-06 22861 Medina Lane September 27, 2018 Page 6 of 6 Prepared by: Erick Serrano, Associate Planner Reviewed and Approved by. Piu Ghosh, Principal Planner Attachments 1— Draft Resolution for ASA -2017-06 2 - Plan Set 3 — Public Comment CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION No. 95 OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL APPLICTION FOR 1,487 SQUARE FOOT ADDITION TO AN EXISTING DUPLEX SECTION I: PROTECT DESCRIPTION Application No.; ASA -2017-06 Applicant: Susan Chen (SC Design Group) Location: 22861 Medina Lane APN: 342-30-013 SECTION II: FINDINGS WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an application to allow an Architectural and Site approval of a 1;487 square foot addition town existing single- story duplex located on property zoned R-3; WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting in regard to the application; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds: 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The applicant is proposing an addition of 1,487 square feet to an existing duplex. The addition is designed to visually match the current structure and will be consistent to the form and land use of surrounding properties. This has been accomplished by maintaining a similar building form, roof lines, and window treatments. Additionally; exterior finishes of the addition will be consistent with regard to stucco, roofing material, and windows. Therefore, the project is not detrimental to the public health, safety, general welfare or convenience. Resolution No. 95 ASA -2017-06 September 27, 2018 Page 2 2. The proposal is consistent with the purposes of Chapter 19.168, Architectural and Site Review, of the Cupertino Municipal Code, the General Plan, any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings; The subject flag -lot currently has the only second -story element on Medina Lane, with single - story buildings adjacent to the east and west on the same block face. The property is also adjacent to a row of attached townhomes to the north (rear) and down the slope with minimal lot sizes and setbacks. Any additional and new building height and bulk should be carefully sculpted to avoid abrupt changes in building scale to the immediate vicinity and offer a gradual transition to existing buildings. The project proposes to extend the existing two-story element farther north and toward the existing townhome structures in the rear. The configuration of the subject lot and the proximity to the adjacent existing buildings make such expansion abrupt and lack transition. Therefore, a reduction of the proposed second -story expansion should be limited to massing, scale, and design elements necessary to accommodate reasonable access and connection to the ground floor. b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new buildings should harmonize with adjacent development by being consistent or compatible with design and color schemes, and, with the future character of the neighborhood and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments, and provide shielding to prevent spill-over light to adjoining property owners; and The proposed architectural design, materials, finishes, and textures will match the existing building and are compatible with the character of the neighborhood. The project proposes no changes to the location, height, and materials of walls, fencing, and landscaping. Exterior lighting other than that typically used in residential development is not being proposed and no spill-over light uncommon in residential neighborhoods will occur. Furthermore, the Resolution No. 95 ASA -2017-06 September 27, 2018 Page 3 proposal has been designed to meet the R-2 Multi -Family Residential Ordinance and does not propose to locate unsightly storage, utility units, andlor parking lots visible to the public right-of-way. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures shall minimize traffic hazards and shall positively affect the general appearance of the neighborhood and harmonize with adjacent development; and No signage or outdoor advertising is requested through this proposal. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls .and other appropriate design measures The proposed addition is located in an existing duplex located on a flag lot, which makes the development difficult to see from the public right-of-way. The project has been designed in accordance, with the development standards of the R-2 Zoning District with the intent to protect residents from unnecessary noise, traffic, light and visually intrusive effects. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on Page 3 thereof, the application for an Architectural and Site Approval, Application no. ASA -2017-06, is hereby approved; and That the sub conclusions upon which the findings and conditions specified in this Resolution are based and contained in the public meeting record concerning Application No. ASA -2017-06 as set forth in the Minutes of the Administrative Hearing Meeting of September 27, 2018, and are incorporated by reference herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set prepared by SC Design Group consisting of nine (9) sheets labeled "Gu & Ming Residence", except those as may be amended by conditions in this resolution.. 2. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the building plans. Resolution No. 95 ASA -2017-06 September 27, 2018 Page 4 3. ACCURACY OF PROTECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 4. FENCES Any changes to the fencing shall require design review with the Community Development Department and shall comply with Cupertino Municipal Code Chapter 19.48 Fences 5. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible for consulting with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 3. EXTERIOR BUILDING MATERIALS/TREATMENTS Final building exterior treatment plan (including but not limited to details on exterior color, material, architectural treatments, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The final building exterior plan shall closely resemble the details shown on the original approved plans. Any exterior changes determined to be substantial by the Director of Community Development shall require a modification approval with neighborhood input. Prior to issuance of building permits, staff will review exterior material, architectural elements, and building scale and massing to ensure quality and consistency with the approved findings prescribed in Section II above. 4. GEOTECHNICAL PLAN REVIEW The applicant's geotechnical consultant should review and approve all geotechnical aspects of the development plans (i.e., site preparation and grading, site drainage improvements and design parameters for foundations, drainage, pavement and retaining walls) to ensure that their recommendation have been properly incorporated. The following should be performed prior to final (as -built) project approval: The Geotechnical Plan Review should be submitted to the City for review and approval by the City staff prior to issuance of building permits. Resolution No. 95 ASA -2017-06 September 27, 2018 Page 5 5. GEOTECHNICAL FIELD INSPECTION The geotechnical consultant should inspect, test (as needed), and approve all geotechnical aspects of the project construction. The inspection should include, but not limited: site preparation and grading, site surface and subsurface drainage improvements and excavation for foundation and retaining walls prior to the placement of steel and concrete. The following should be specifically performed: The Project Geotechnical Consultant should closely monitor the fill and expansive soil over -excavation, and pool backfill to assure that rigid grid foundation is placed on low -expansion potential materials, and atop suitably compacted fill materials. 6. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the "indemnified parties") from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys' fees and costs within 30 days following receipt of invoices from City. Such attorneys' fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 7. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 -day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. Resolution No. 95 ASA -2017-06 September 27, 2018 Page 6 PASSED AND ADOPTED this 27th day of September, 2018 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director. of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: /s/Erick Serrano /s/Benjamin Fu Erick Serrano Benjamin Fu Associate Planner Asst. Director of Community Development O O r . O A 1" x - rn 3 ' a- m x �w N ? V ^O1 i x a Z VICINITY MAP <E>FRUIT TREE z eTBD 4 GENERAL INFORMATION - OWNER: 4ARRY GU & WE[ MING 1 EMAIL: CIHARRY[OIGMAIL.COM 3,554 SQ.FT. PHONE: 75.240.9793 PROPOSED: PROPERTY E2861 MEDINA LN. 15.10° ADDRESS: 3UPERTINO,CA 95014 ENTERTAINMENT'. RD OM, FAMILY ROOM AP N:AP N:342 -3D-013 6'•O' DESCRIPTION OF N>l ST FLOOR ADDITION: 1,161 51;.FT. WORK: <N>MASTER BDRM, BTHRM, WIC, HALF THRM, FAMILY ROOM, ENTERTAIN ENT �> FRONT COVERED PORCH ROD M 1'161 SQ.FT. LANDSCAPING <E, TRE N>2ND FLOOR ADDITION: PROPOSED 2ND FLOOR ADDITION AREA FRONT17'-1• OFT 326 5q. I. D NO CHANGE N>PORCH 33 SQ.FT. .326 SQ.FT. LAND USE: OW/MEDIUM DENSITY (5.10 DU/AR.1 5' PUBUC - ZONING: 2-4.25 Unum. OCCUPANCY GROUP: -3/U EASEMENT TYPE OF 45-4' 2O' -O' CONSTRUCTION: IVIS, FULLY SPRINKLED STORIES: TWO STORIES NET LOT AREA: 10,937 SQ.FT. GROSS LOT AREA: 12.ZO2 SQ.FT. TI GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION AND EXECUTION OF THE AND ALL NEW 10. GENERAL CONTRACTOR SHALL INSTALL ALL APPLIANCES NS. 1ST FLOOR - 6' PROPERTY FLOOR CALCULATION SETBACK UNE REFER TO Al. I FOR BLOCK DIAGRAM: 5' WIRE - EXISTING 1ST FLOOR: CLEARANCE (E) UNIT 1 1.625 SQ.FT. EASEMENT (EI GARAGE 871 SQ.FT. D TO AVOID CONFLICT IN THE LOCATION. INSTALLATION, AND CONSTRUCTION OF ALL ITEMS (EI UTILITY ROOM 85 SQ.FT. BD (EI COVERED PORCH 96 SQ.FT. E WORK AS INDICATED ON THE CONSTRUCTION DOCUMENTS. IF ANY WORK IS TO BE INSTALLED BY THE OWNERS WORK MUST BE MADE. COORDINATE WITH TOTAL EXISTING 1 ST FLOOR 2,690 SQ.FT. STAIRS <NOT COUNT> 62 SQ.F7. EXISTING 2ND FLOOR: 922 SQ•FT, IE'UNIT 2 lG�•BD <E>RETAINING WALL 0RANGES 3' HEIGHT Cf UNf >EUNCALYP 72� 89=43, 780` a 2 Jr »W NDSC SWIM SPA ABOVV '-I _ <E>PAVERS <N> 1 ST FLOOR ADDITION: <N>MASTER BDRM, BTHRM, WIC, HALF BTHRM, FAMILY ROOM, ENTERTAINMENT ROOM =, 39, I A <N>IPAI RS WALKWAY_ ('I 22'-1•1�--- ------ FCO I 1<E>EM _ -- ED - "A a,l a'II t1 _ WA io N0. �" . ,. <E> TOTAL FLOOR AREA 3,554 SQ.FT. <N> TOTAL FLOOR AREA 5,074 SQ.FT. EXISTING LOT COVERAGE 25.6% 2,690-F62+51=2,803 SQ.FT. PROPOSED LOT COVERAGE 35.3% (REFER TO SHEET A-1.2) 3,B62 SQ.FT. MAX LOT COVERAGE 40% 4.905 / 10937 = 44.8% PROPERTY SETBACKS TOTAL EXISTING BUILDING ON SITE GENERAL NOTES 1 TOTAL: 3,554 SQ.FT. EXISTING: �>FR I TRE PROPOSED: PROPOSED 1ST FLOOR ADDITION AREA FRONT 15.10° 4 -TBD - D ' NO CHANGE ENTERTAINMENT'. RD OM, FAMILY ROOM LEFT SIDE 22.1' 6'•O' NO CHANGE M. BORN, M. BTHRM; HALF BTHRM, WIC 1,161 51;.FT. 11'-1' 6'•0' 8'-O' FRONT COVERED PORCH 33 SQ.FT. 22'•10' <E, TRE 18'-6' PROPOSED 2ND FLOOR ADDITION AREA FRONT17'-1• I. D NO CHANGE LOFT .326 SQ.FT. 58•11' - NO CHANGE <N> TOTAL LIVING AREA ON SITE ADDED 1.520 SQ.FT. 11'-I' 9'-O' <E> TOTAL FLOOR AREA 3,554 SQ.FT. <N> TOTAL FLOOR AREA 5,074 SQ.FT. EXISTING LOT COVERAGE 25.6% 2,690-F62+51=2,803 SQ.FT. PROPOSED LOT COVERAGE 35.3% (REFER TO SHEET A-1.2) 3,B62 SQ.FT. MAX LOT COVERAGE 40% 4.905 / 10937 = 44.8% PROPERTY SETBACKS FLOOR GENERAL NOTES <N> 2ND SETBACK: EXISTING: REQUIRED: PROPOSED: FRONT 15.10° 20'-0' NO CHANGE 0 LEFT SIDE 22.1' 6'•O' NO CHANGE yOj RIGHT SIDE 11'-1' 6'•0' 8'-O' - REAR 22'•10' 10'-O' 18'-6' FRONT17'-1• 20'-0' NO CHANGE D0 LEFT SIDE 58•11' 9'•0' NO CHANGE wa RIGHT SIDE 11'-I' 9'-O' 20.11' REAR 45-4' 2O' -O' 24•1' CODE & REGULATION ALL WORK TO COMPLY WITH THE 2016 C.B.C., C.M.C., C.P.C. & 201 a C.E.C., CALIFORNIA TITLE 24 AMENDMENTS, AND CITY OF CUPERTINO BUILDING CODE USED PERFORM THE WORK ACCORDING TO THE BUILDING CODES, ORDINANCES AND LAWS OF THE AUTHORITY HAVING JURISDICTION OFTHE PROJECT WHICH INCLUDE BUT ARE NOT LIMITED TO: A. 21316 CALIFORNIA BUILDING CODE B. 201 6 CALIFORNIA RESIDENTIAL CODE C. 201 6 CALIFDRNIA MECHANICAL CODE D. 2016 CALIFORNIA PLUMBING CODE E. 2016 CALIFORNIA ELECTRICAL CODE F. 201 6 CALIFORNIA FIRE CODE G. 2016 CALIFORNIA GREEN BUILDING STANDARD CODE F. CITY OF CUPERTINO MUNICIPAL CODE ARCHITECTURAL A•1.0 COVER SHEET / SITE PLAN A•1.1 DEMO PLANS A•1.2 BLOCKDIAGRAMS A-2.0 PRO POSED. FLOOR.P LAN 5. A -3.O EXISTING ANO PROP09E0 FRONT ELEVATIONS A-3.1 EXISTING AND PR0PC9 ED REAR ELEVATIONS A-3.2 EXISTING AND PROPOSED LEFT ELEVATIONS A-3.3 EXISTING AND PROPOSED RIGHT ELEVATIONS A•3.4 PROPOSED CRO55 SECTIONS PROJECT DATA - -- I ' 1 1 10'. rill -- ---- 1 tilt 1 1 i 1 j jl I , I 1 I 1 1 mI 1 r ' 1 Z .'1 I , I 1 1 I \ 1 1 1 , 1 v 1 I .' . <E>LA E#APt �(y.>eOPLAR, . �>WALKWAY s TEF I 6 - - <D!LANDSCAPE Hf(GyT WOODEN w s a N89*5 FfNOf uN f I✓` 65.00 J < a I a I a I a I I I I a SITE I OTES: ALLMEN510 N5 AND SETBACK POINTS N EED�TO BE CHECKED BEFORE THE ADDI ON TAKES PLACE. PLEASE VERIFY ALL S BACKS FROM THE BOUNDARY OF THE PiROPERTY TO THE <E> HOUSE AND <N> DDITI ONB PRIER TO DIGGING NEW FOUNDATION AND POURING OFTHE CONC ETE OR FORM WORK SETUP. IFTHE SETBACK ATTHE SITE ODES NOT MATOFF��UP TO THE DRAWING OR IS OVER THE AfTLOWABLE SETBACK PLEASE CONT T THE PROJECT ARCHITECT FOR FURTH R GUIDANCE ON THE PROJECT. a I 33 SQ.FT. CH 10295 EL PRADO WAY 1 0 , , 1 CRICKE --- I I o II I� � 12X ADPE II DS9 I yy,PROP TY I, I SE4BAC NE �a ,♦1711 3'771 ♦!T mOI <E>PARK G "� J \ I' GE>PARKING \RKiN 10•_0., 10' 0' o .. �I... NfT lOT ,yRfq 'S 0, 3. >�, DRIVE WAY PROPOSED SITE PL CF `O' Sir\ SCALE: 1 /El ' = l'-0" 59/SVS.9 it, J, 0 6'781 V 2 S IA4 �® Sigansaure REVISION 09.07.2016 ISI PREUTAXW PUNNING 022017 2ND PREUWNARY MING 11 062017 PIAIINNG REVIEW 1 10.2017 PLANNING REVEW 0 12.2017 PLWNING REVIEW 012018 PLANNING RIVEN,`-`- 052018 PLANNING REVIEW, 0719.18 PLANNING REVIEW 6 PROJECT NO, 1612 DATE 022017 SITE PLAN A-1.0 FLOOR GENERAL NOTES <N> 2ND G U & MING ADDITION: G N> LOFT 1. WORKING HOURS: NO WORK SHALL COMMENCE ON THE JOB SITE PRIOR TO 7:00 A.M. NOR 6. IN CASE OF ANY DISCREPANCY IN THE CONTRACT DOCUMENTS, CONSULT THE ARCXRECT R E S I D E N C E CONTINUE LATER THAN 6:00 P.M., MONDAY THROUGH FRIDAY, NOR SHALL ANY WORK BE PERMITTED ON SATURDY OF SUNDAY UNLESS PRIOR APPROVAL IS GRANTED BY THE BUILDING BEFORE PROCEEDING. 7. NO DIMENSIONS SHALL BE TAKEN BY SCALING FROM THE DRAWINGS. DETAILS TAKE PRECEDENCE OVER GENERAL SECTIONS OR FLOOR PLANS. IF DIMENSIONS MUST BE OF CAL. 2. GENERAL CONTRACTOR SHALL VERIFY ALL UNDERGROUND UTILITY LOCATIONS PRIOR TO CLARIFIED, CONSULT THE ARCHITECT. REFER TO THE COVER SHEET FOR DIMENSIONING TACTOR SHALL COORDINATE EXCAVATION, TRENCHING, OR GRADING OF ANY KIND. GENERAL CONTRACTOR CABLE TV, GAS, STANDARDS. B. VERIFY ALL DIMENSIONS ON THE SITE PRIOR TO ORDERING OR MANUFACTURING. LN 22861 MECA WITH APPLICABLE STILET COMPANIES WHEN REROUTING ELECTRICAL, TELEPHONE, OTHER STILT'. G. C. SHALL MAINTAIN ALL VIE FRAMING. 9. GENERAL CONTRACTOR SHALL REVIEW ALL ARCHITECTURAL DRAWINGS BEFORECUPERTINO,CA 9 01 95U 1 4 WATER, SANITARY SEWER SERVICES, OR ANY ELECTRICAL AND C MM SYSTEMS IN ROUSE AT ALL TIMES. O UNIRMED LIGHT FIXTURE LOCATIONS SHAFTS AND HVAC DUCTWORK PR100. Co ORDINATE RECESSED I WITH BE PERFORMED IN ACCORDANCE WITH ALL GOVERNING CODES ORDINANCES 3. ALL WORK IS TO I T O FRAMING. IT IS IMPERATIVE THAT FRAMING MEMBER LOCATIONS DO NOT CONFLICT AND REGULATIONS. G. C. SHALL BECOME FAMILIAR WITH ALL CITY OF ASPECTS WORKING., LOCATIONS OF RECESSED LIGHT FIXTURES. IF CONFLICT EXISTS, NOTIFY ARCHITECT. TI GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION AND EXECUTION OF THE AND ALL NEW 10. GENERAL CONTRACTOR SHALL INSTALL ALL APPLIANCES NS. WORK SHOWN OR IMPLIED THE CONSTRUCTION DOCUMENTS AND IS RESPONSIBLE FOR ALL EQUIPMENT ACCORDING S TO MANUFACTURERS INSTRUCTIONS. ALL GUARANTEES, HE ]EC[ CONSTRUCTION MEANS, METHODS, AND PROCEDURES. T 4. GENERAL CONTRACTOR SHALL COORDINATE ALL FACETS HIS WORK AND ALL TRADES INVOLVED F R N REGARDING NEW EQUIPMENT PMENT SHALL INSTRUCTION BOOKLETS, ANON O MATZO 1 Q CANOED DIRECTLY TO THE OWNER ONE MANILA ENVELOPE AT THE TIME OF SUBSTANTIAL -r= J..]] D TO AVOID CONFLICT IN THE LOCATION. INSTALLATION, AND CONSTRUCTION OF ALL ITEMS COMPLETION. CONTRACTOR SHALL VERIFY THAT EVERY PIECE OF EQUIPMENT AND EVERY V BD E WORK AS INDICATED ON THE CONSTRUCTION DOCUMENTS. IF ANY WORK IS TO BE INSTALLED BY THE OWNERS WORK MUST BE MADE. COORDINATE WITH APPLIANCE IS IN PERFECT WORKING ORDER AND THAT INFORMATION ABOUT ALL WARRANTIES AND GUARANTEES 13 MADE KNOWN TO THE OWNER. >SYPRESS THE OWNER DIRECTLY, ALLOWANCES FOR 11. THE INSTALLER OF EACH MAJOR UNIT OF WORK IS REQUIRED TO INSPECT THE SUBSTRATE lG�•BD ARCXITECT / OWNER. 5. GENERAL CONTRACTOR SHALL LEAVE THE JOB SITE "BROOM CLEAN AT THE END OF EACH AND CONDITIONS TO RECEIVE WORK AND SHALL REPORT ALL UNSATISFACTORY CONDITIONS TO THE GENERAL CONTRACTOR AND NOT PROCEED UNTIL SATISFACTORY CONDITIONS ARE y0370 TOWN CENTER LN WORKING OAT. ALL MATERIALS SHALL BE STORED INA NEAT ANO SAFE PLACE TO AVOID ATTAINED. SLATE 139 pACCIDENTS, ��,-_GE>SYPRCCC FOR CONSTRUCTION AND FOR THE OWNER. 12. FOR MOUNTING HEIGHTS NOT CLEARLY OUTLINED IN THE PLANS OR SCHEDULES, CU PE RTINO, CA 95014 �L JI'Gr•IInGJJ COORDINATE WITH THE ARCHITECT. ARCHITECT SHALL CONFIRM ALL ELECTRICAL DEVICE 408.865.0577 - AND LIGHT FIXTURE LOCATIONS BEFORE CONTRACTOR PULLS WIRE. 13. PROVIDE SOLID BLOCKING AS NECESSARY FOR WALL MOUNTED SHELVES. FIXTURES. AND ."M FITTINGS, EVEN WHEN WORK IS TO BE DONE BY OWNER DIRECTLY. REVIEW SCOPE OF WORK AND LOCATIONS FROM INTERIOR ELEVATIONS AND COORDINATE WITH OWNER/ARCHITECT. Q O 14. ALL FASTENING DEVICES TO BE CONCEALED, UNLESS OTHERWISE SHOWN. �` 15. WEATHER-STRIP ALL EXTERIOR DOORS AND WINDOWS. CAULK OR OTHERWISE SEAL AROUND ALL OPENINGS TO LIME INFILTRATION, INCLUDING BUT NOT LIMITED TO: EXTERIOR JOINTS AROUND WINDOWS AND DOOR FRAMES, BETWEEN SOLE O PLATES AND FLOORS AND BETWEEN EXTERIOR WALL PANELS. 17. GENERAL CONTRACTOR SHALL VERIFY THAT ALL WORK ON THE EXTERIOR OF THE PROJECT - - --- IS WATERTIGHT. ALL JOINTS EXPOSED TO THE ELEMENTS SHALL BE TESTED FOR WATER TIGHTNESS PRIOR TO 9UEHTANTIAL COMPLETION. -% `-` '----_ PUBLIC UTILITY O Itj __ EMENT o 0 1603 SP UT v X ® o 1^o SIH LOCK I -- 8'-0• WIRE CLEARANCE v o SEMENT _ 6 - - <D!LANDSCAPE Hf(GyT WOODEN w s a N89*5 FfNOf uN f I✓` 65.00 J < a I a I a I a I I I I a SITE I OTES: ALLMEN510 N5 AND SETBACK POINTS N EED�TO BE CHECKED BEFORE THE ADDI ON TAKES PLACE. PLEASE VERIFY ALL S BACKS FROM THE BOUNDARY OF THE PiROPERTY TO THE <E> HOUSE AND <N> DDITI ONB PRIER TO DIGGING NEW FOUNDATION AND POURING OFTHE CONC ETE OR FORM WORK SETUP. IFTHE SETBACK ATTHE SITE ODES NOT MATOFF��UP TO THE DRAWING OR IS OVER THE AfTLOWABLE SETBACK PLEASE CONT T THE PROJECT ARCHITECT FOR FURTH R GUIDANCE ON THE PROJECT. a I 33 SQ.FT. CH 10295 EL PRADO WAY 1 0 , , 1 CRICKE --- I I o II I� � 12X ADPE II DS9 I yy,PROP TY I, I SE4BAC NE �a ,♦1711 3'771 ♦!T mOI <E>PARK G "� J \ I' GE>PARKING \RKiN 10•_0., 10' 0' o .. �I... NfT lOT ,yRfq 'S 0, 3. >�, DRIVE WAY PROPOSED SITE PL CF `O' Sir\ SCALE: 1 /El ' = l'-0" 59/SVS.9 it, J, 0 6'781 V 2 S IA4 �® Sigansaure REVISION 09.07.2016 ISI PREUTAXW PUNNING 022017 2ND PREUWNARY MING 11 062017 PIAIINNG REVIEW 1 10.2017 PLANNING REVEW 0 12.2017 PLWNING REVIEW 012018 PLANNING RIVEN,`-`- 052018 PLANNING REVIEW, 0719.18 PLANNING REVIEW 6 PROJECT NO, 1612 DATE 022017 SITE PLAN A-1.0 >v iP •/ \ 7.9 \ ,.. / \ \ 156 3 SQ F S f Ff 0 � \ o \ s»: � 1 \ / 1ST FLOOR I'l-'_ sQM ❑ 1 pt \ i - Eng RIOR HALLWAY UNIT 11540.6\8 TWEEN'UNITS / SQ FT RC VERED - -fi-L---- ° :UNIT 54� 6 871SQFi Ii / ya\ t Z 4 o \ � GARAGE' --_ . I 11 r 335Q FT 1------.--- .. _c II o00 oma` PROPOSED BLOCK 3-O DIAGRAM -1 ST FLOOR �,♦ - SCALE: 1 /8° = V -O" ° NET LOT AREA: 10,937 SQ FT GU & MING ....................__...:......__....__._ ............._._.. ° RESIDENCE ..............._.... ..... . ; (10) 2,455 SQ FT 22861 MEDINA LN E EXISTING FLOOR AREA: CUPERTINO,CA 95014 I UNIT #1 (1) 1,625 SQ FT LOT WIDTH X 20 = 113'-4° X 20 =2,266 SQ FT 63 ❑ �• 58.2 SQ (2) 871 SQ FT ;Q FF o DEMO (5) 51 SQ FT r.A - 14' ., ;u:'•/��; - 20370 TOWN CENTER LN SUITE 139 / \ (6) 85 SQ FT REDUCED TO 1 O FEET CUPERTINO, CA 95014 408.865.0577 .°•; 9 UNIT #2 (7) 922 SQ FT 23 :S SQ FT - TOTAL: 3,554 SQ FT ADDITION: 30 SQ FF <E>STAIRS LOT COVERAGE: (9) 326 SQ FT vvv 2ND FLOOR._,. -, TO REMAIN (1) 1,638 SQ FT (1 1) 33 SQ FT ff IT 2373 " r (2) 871 SQ FT TOTAL: 1,525 SQ FT �.. 254.4 SQ.FT 224.8 SQ PT ® 442.8 SQ FT \ - i \ I APPROVAL (4) 63 SQ FT __c� _ 6'9L"i liCat16/ll C\p'....la.tba v (5) 51 SQ FT DRC PROPOSED BLOCK /----.—`-+�-.1- (6) B5 SQ FT DIAGRAM -2ND FLOOR -4-0 (( SCALE: 1/8" = 1'-0" Signature (7) 922 SQ FF ° NET LOT AREA: 10,937 SQ FT USABLE REAR YARD AREA: ° (10) 2,455 SQ FT EXISTING FLOOR AREA: UNIT #1 (1) 1,625 SQ FT LOT WIDTH X 20 = 113'-4° X 20 =2,266 SQ FT 63 ❑ GARAGE (2) 871 SQ FT ;Q FF o DEMO (5) 51 SQ FT THEREFORE, THE REAR YARD SETBACK COULD BE DEMO (6) 85 SQ FT REDUCED TO 1 O FEET UNIT #2 (7) 922 SQ FT TOTAL: 3,554 SQ FT ADDITION: (8) 1,161 SQ FT <E>STAIRS LOT COVERAGE: (9) 326 SQ FT TO REMAIN (1) 1,638 SQ FT (1 1) 33 SQ FT (2) 871 SQ FT TOTAL: 1,525 SQ FT ® (3) 96 SQ FT ❑ (4) 63 SQ FT PROPOSED FLOOR AREA: (5) 51 SQ FT (1) 1,625 SQ FT (6) B5 SQ FT Y 871 SQ FT TOTAL: 2,804 SQ FT (7) 922 SQ FF 25.6% (6) 1,161 SQ FT (9) 326 SQ FT UNIT#1: 1,625 SQ FT TOTAL: 4,905 SQ FT UNIT #2: 922 SQ FT FAR: 44.8% ❑ ❑ 1 ST TO 2ND UNIT RATIO: 1.76 LOT COVERAGE: (1 ) 1 ,638 SQ FT REVISION 00.071016 i5f PREUABWRY PUNNING (2) 871 SQ FT P1 wxc (3) 96 SQ FT u.;IIM,PlG°11 (4) 63 SQ FT 101017 PUNNING RENEW 2 (8) 1,161 SQ FT 2.2D17 PLANNING REMEN 01.2018 PUNNING RENEW�.,._, (1 1) 33 SQ FT 052016 PwNNG REVD TOTAL: 3,862 SQ FT 0%.19.2018 PLANNING REVIEW 6 35.3% 1ST UNIT: 1,625 SQ FT 2ND UNIT: 922 -F 1,161-f326=2,409 SQ FT PROJECT NO. 1612 DATE 071017 2ND TO 1 ST UNIT RATIO: 1.48 PROPOSED FAR: 4,905/ 10,937 = 44.8% A BLOCK DIAGRAMS A-1.21 PROPOSED PLAN — 1 -O 0 2 4 8 SCALE: 1/4" = 1'-0" NEW WALL "96� ILII NiL.Y 4rPb�u tes �c-\:'�'GG�'"= G PROPOSED 2ND FLOOR PLAN A�,��kation N,,be, r7 _ O u a Nt" f� SCALE: 1/4° = 1,_Ou Dat DEMO WALL €, -e Manager GU & MING RESIDENCE 22861 MEDINA LN CEIPERTINO,CA 95014 REVISION 09.07.2016 IST PRE1111NARY PUJINING 022017 2ND PREJ INM 06.PLANNING R 2017 PUNNING EW REN 10.2117PIANNING REVIEW 12.2017 PUNNING RENEW 01.2016 PLAN NG REVIEW A� 06.2016 PIANNNG REVIEW 2 {3\ PROJECT NO. 1612 DATE 022017 PROPOSED FLOOR PLANS A-2.01 wv` COMPOSITION SHINGLE ROOF _O PROPOSED ELEVATION FRONT SOUTH 0 2' 4' 8' SCALE: 1/4" = l' -O" APPROVAL DRC 1,q44 Signature I 217 EXISTING ELEVATION FRONT SOUTH -0 0 2' 4' 8' SCALE: 1/4" = 1'-0" GU & MING RESIDENCE 22861 MEDINA LN CUPERTINO,CA 95014 REVISION 09.07.2016 IST PREllYPURY PUNNING 02.2017 2110 PRELWINNO' PUNNING 062017 PUNNING REVIEW 102017 PUNNINGREVIEW 122017 PUNNING REVIEW 1 01.2018 PUNNING REVIEW Q 052018 PLANNING REVIEW PROJECT NO. 1612 DATE 02.2017 1 EXISTING & PROPOSED FRONT ELEVATIONS IIsloll _O PROPOSED ELEVATION REAR NORTH 0 2' 4' 8' SCALE: 1/4" = 1'-0" \ \ \ \ \ \ \ \ \ 100' FRO NATURAL GRADE FROM PROPERTY LINE F.F. 3 D R G, / (M Vgnalure EXISTING ELEVATION REAR NORTH -2- 0 0 z' a' a' SCALE: 1/4" = 1'-0" GU & MING RESIDENCE 22861 MEDINA LN CUPERTINO,CA 95014 REVISION 09.07.2016 IST PREUMNARY PUNNING D220 062012N0 PREllMINARf PUNNING REV 7 PLANNING REVIEW 10.2017 PUNNING RENEW 0 122017 PUNNING REVIEW I 01.201B MANNING RENEW Q� 052016 MANNING RENEW '3\ PROJECT NO. 1612 DATE 022017 1 EXISTING & PROPOSED REAR ELEVATIONS A-3.11 _O PROPOSED ELEVATION WEST 0 2' 4' 8' SCALE: 1/4" = 1'-0" EXISTING ELEVATION WEST —2-0 0 2' 4' 8' Ammm6mmiiiiiii SCALE: 1/4" = 1'-0" APPROVAL DRC /4P a. signalwe GU & MING RESIDENCE 22861 MEDINA LN CUPERTINO,CA 95014 20370 TOWN CENTER LN SUITE 139 CUPERTINO. CA 95014 40B.865.O577 lo -rt 3�3�((� -,;2 -1 +1.1� REVISION 09.072016 IST PREIJMMARY PUNNING 02.2017 2ND PRELIMINARY PUNNING R 06.2017 PLANNING REVIEW 10.2017 PLANNING REVIEW 122017 PLANNING RENEW 012018 PUNNING REVIEW 2 052018 PLANNING REVIEW PROJECT NO. 1812 GATE 022017 EXISTING & PROPOSED LEFT ELEVATIONS A-3.2 PROPOSED ELEVATION EAST 1 _0 0 2' 4' 8' AuFmommmmiiiiiI SCALE: 1/4" = 1'-0" EXISTING ELEVATION EAST 2'❑ 0 2' a' e' SCALE: 1/4" = 1'-0" 10''-0' FROM NATURAL GRADE FROM PROPERTY LINE GU & MING RESIDENCE 22861 MEDINA LN CUPERTINO,CA 95014 ton i REVISION 09.072016 IST PRRAJ ARP PLANNING 022017 2ND PRELPIINARY PLANNING R 062017 RAINING RENEW 102017 PUNNINGRENEW 122017 PUNNING RENEW 012018PLANNING RENEW Q 052018 PLANNING REVIEW PROJECT NO. 1611 DATE 022017 EXISTING & PROPOSED RIGHT ELEVATIONS A-3.3 SUBJECT COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 TELEPHONE: (408) 777-3308 i FAX: (408) 777-3333 CUPERTINO.ORG ADMINISTRATIVE HEARING STAFF REPORT Agenda Date: September 27, 2018 Development Permit and Architectural and Site Approval to consider allowing a 1,016 sq. ft. second floor addition to an existing office building for West Valley Community Services. (Application(s): DP -2018-06 and ASA -2018-07; Applicant: Josh Selo; Project Location: 10104 Vista Drive; A.P.N.: 316-24-059) RECOMMENDED ACTION That the Hearing Officer adopt the Draft Resolutions to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve the Development Permit (DP -2018-06) and Architectural and Site Approval (ASA -2018-07) (See Attachments 1 and 2). DISCUSSION Project Data: Special Area/Neighborhood Heart of the City Special Area and Central Stevens Creek Boulevard Subarea General Plan Designation Residential Medium 10-20 dwelling units per acre Zoning Designation P (CG, Res) Existing Proposed Lot Size 51,270 sq. ft. (1.18 acres) No Change Lot Coverage 33% No Change WVCS Total (sq. ft.) 5,177 6,193 First Floor (sq. ft.) 3,284 No Change Second Floor (sq. ft.) 1,893 2,909 Total Building Height 28' No Change Project Consistency With: General Plan Yes Zoning Yes Environmental Review Categorically Exempt per Section 15301 of the California Environmental Quality Act (CEQA) Background: Site Description The property is located approximately 200 feet north of the Stevens Creek Boulevard and Vista Drive intersection on the east side of Vista Drive. The property is located within the Central Stevens Creek Boulevard Subarea of the Heart of the City Special Area (See Figure 1). The surrounding uses are comprised of townhomes, with single family residential uses beyond, to the north; commercial, commercial office, and office to the south; office, commercial office, and residential uses to the east; commercial office and higher density (townhomes) to the west. Previous Approvals Figure 1: Aerial The Planning Commission approved a Use Permit (U-2000-14) and a Heart of the City Exception (EXC-2000-10) in December 2000 to permit the construction of a 5,225 square Figure 2: Site Configuration 0 WVCS Office Building 0 Residences R Carports administrative office building/residential community building, 12 one -bedroom and 12 two-bedroom affordable apartments with 52 shared residential and office parking spaces on a 1.18 -acre vacant lot (See Figure 2). Specifically, the office and community building were permitted to be used for general office uses and all other associated programming and services, offered by West Valley Community Services' (WVCS). WVCS provides services that include a food pantry, clothing distribution; emergency financial assistance, financial coaching, family support, access to public health and food assistance benefits, case management, and referral services. Analysis: Application Requests The applicant, Josh Selo, Executive Director of WVCS, is requesting that the City permit the addition of 1,016 sq. ft. to the second floor of the existing WVCS building. WVCS is not increasing staffing, programming, modifying the uses nor the hours of operation. As part of this proposal, West Valley will be reconfiguring the internal space of the entire building to provide the following operational improvements: ® Relocate the existing conference room to. accommodate all required staff and board members at meetings ® Convert existing cubicle space into additional food pantry storage to address community. need Utilize the entire food pantry area for services, rather than reserving some as storage area, to allow for more clients to walk through the pantry at one-time ® Improve space efficiency of meeting rooms and office space Architectural Design The addition will extend the second floor to the west (toward Vista Drive) to accommodate for three new offices and to the north (internal) for the new conference Area Qin sq. ft.) Existing Net Change proposed ]Food Pantry 683 275 958 Staff an& client Meeting ][dooms 1,208 575 1.,783 Staff Offices 1,239 `` 166 1,405 Reception 610 - 610' Resident Laundry 87 - 87 Other: Corridors, storage,, restrooms, etc. 1,350 - 1,350 TOTAL 5,177 1,016 6,193 Architectural Design The addition will extend the second floor to the west (toward Vista Drive) to accommodate for three new offices and to the north (internal) for the new conference room. It will be located above a portion of the building that is currently single -story and will be within the footprint of the existing building. In order to maintain architectural integrity, the proposal will maintain the existing horizontal and vertical wood siding, roof brackets, and composition shingle roof on the addition; and install a new wood trellis on the first -story portion below the area where three new offices are proposed on the second floor. The trellis will provide architectural relief to the western elevation that faces Vista Drive and will match the existing trellis to the north elevation. Vehicular and Bicycle Parkin With the original Use Permit, the development was approved with 52 stalls when the number of stalls required per the Municipal Code was 66 stalls (i.e. less than the Parking Ordinance standard of two stalls/unit.) A parking management plan was required to ensure that there would not be any impacts to the neighborhood (See Attachment 5 for WVCS Parking Management Plan). In addition, a condition of approval was added to the resolution that, at the City's discretion, WVCS may be required to modify their uses or revise the parking management plan, if the use of the office space proved to be too intense and affected the neighborhood. However, no changes have been required so far since no impacts have been felt. At this time, WVCS is proposing to add square footage without intensifying the programming but is not proposing additional parking. For Planned Development zones, such as this property, reduced parking standards may be approved if validated through a parking study that determines that adequate parking has been provided for the proposed uses. To that end, Hexagon Transportation Consultants, was retained by the City to conduct a parking study to evaluate on-site parking demand and availability. The parking study was conducted on three weekdays in April (See Attachment 4). The parking study determined that the highest parking demand at the site was 36 stalls. Since the site has 52 spaces, there were 15 vacant spaces still available at the site at that time. Therefore, the site is adequately parked for the uses on the site. As previously noted, the City has the authority to re-evaluate the uses or the parking at the site, in the event that there are neighborhood impacts. Environmental Review This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15301(e) — Existing Facilities because the exemption applies to the addition of up to 10,000 sq. ft. in an area where all public services and facilities are available to allow for maximum development permissible in the General Plan and the project is not located in an environmentally sensitive area. Other Department/Agency Review The City's Public Works Department; Building Division; Environmental Programs Division; and the Santa Clara County Fire Department reviewed the request and have no objections to the project. Environmental Services' comments are incorporated as conditions of approval. PUBLIC NOTICING AND COMMUNITY OUTREACH The following table is a brief summary of the noticing done for this project: .yt� � �''s+. 3xs t :: "0 3' k .T , 1 �,�m:� L✓` �d� r A' y�%"�.:.^�,,s" tjS... 'iad� y� �* .✓ �- � T''✓ ® Site Signage (10 days prior to hearing) ® Posted on the City's official notice ® 8 notices mailed to property owners bulletin board (one week prior to hearing) adjacent to the project site (10 days ® Posted on the City of Cupertino's Web prior to hearing) site (one week prior to hearing) No public comments were received at the time of production of this staff report. PERMIT STREAMLINING ACT This matter is adjudicatory and is subject to the Permit Streamlining Act (Government Code Section 65920 - 65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received: June 28, 2018; Deemed Incomplete: July 27, 2018 Project Resubmitted: September 9, 2018; Deemed Complete: September 11, 2018 The City has 60 days (until November 10, 2018) to makea decision on the project. CONCLUSION Staff recommends approval of the Development Permit and Architecture and Site Approval because the project is consistent with the General Plan, and zoning ordinances, and conforms to Chapters 19.144 and 19.168 of the Cupertino. Municipal Code. Additionally, all of the findings for approval of the proposed project, consistent with the Cupertino Municipal Code, may be made as reflected in the Draft Resolutions. NEST STEPS The permit will be effective 14 calendar days from the date of the hearing. The decision of the Administrative Hearing Officer is final, unless appealed within 14 calendar days from the date of the hearing. The applicant may apply for building and/or other permits with the City at the end of the appeal period. This approval is valid until September 27, 2020. The applicant may apply for a one-time one-year extension before the approval expires. Prepared by: Reviewed and Approved by: ATTACHMENTS Ellen Yau, Associate Planner Piu Ghosh, Principal Planner 1. Draft Resolution for DP -2018-06 2. Draft Resolution for ASA -2018-07 3. Plan Set 4. Parking Study 5. Vista Village Parking Management Plan DP -2018-06 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 96 OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING A DEVELOPMENT PERMIT TO ALLOW FOR A 1,016 SQ. FT. SECOND FLOOR ADDITION LOCATED AT 10104 VISTA DRIVE (APN 316-24-059) SECTION I:. PROTECT DESCRIPTION Application No.: DP -2018-06 Applicant: Josh Selo (West Valley Community Services) Location: 10104 Vista Drive SECTION II: FINDINGS FOR ARCHITECTURAL AND SITE APPROVAL PERMIT: WHEREAS, the City of Cupertino received an application for a Development Permit to consider allowing a 1,016 sq. ft. second story addition, as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least. one public meeting in regard to the application; and WHEREAS, the project is determined to be exempt from the California Environmental Quality Act (CEQA); and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, . the Administrative Hearing Officer finds as follows with regard to this application: 1. The proposed development, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The current building is a two-storyadministrative office for West Valley Community Services and is.located towards the interiorofthe property with one elevation facing Vista Drive and visible from the public right-of-way. The zoning district allows the construction Resolution No. 96 DP -2018-06 September 27, 2018 Page 2 of building of up to 45 feet in height while the existing building is measured at 28'. The proposal is a second story addition, that will not further increase the height of the building but will modify the western and northern elevation. However, even with the addition there will continue to be sufficient setback from adjacent properties. In addition, the proposed addition is located directly above an existing single story portion of the building and will not increase the existing footprint of the building. Therefore, the proposal will not be detrimental or injurious to property or improvements in the vicinity. 2. The proposed development will be located and conducted in a manner in accord with the Cupertino Comprehensive General Plan and the purpose of this title and complies with the California Environmental Quality Act (CEQA). The proposed development is in conformance with the Cupertino General Plan and the proposal has met the development standards as defined by the Heart of the City. Specific Plan and the City Municipal Code such as heights and setbacks. The site is within a Planned Development Zoning District that supports flexibility in parking standards. The parking study supports the proposed addition and concludes that additional parking stalls are not required for this project. Therefore, the proposed development is consistent with the Cupertino General Plan. The project is categorically exempt from CEQA under Section 15301 since it is an addition to an existing structure of less than 10,000 sq. ft. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff's report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 4 thereof,: The application for a Architectural and Site Approval, Application no. DP -2018-06 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Hearing record concerning Application no. DP -2018-06 as set forth in the Minutes of the Administrative Hearing Meeting of September 27, 2018 and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set drawn by Adaptive Architecture entitled "West Valley Community Services Office Addition" consisting of seven (7) sheets labeled as Resolution No. 96 DP -2018-06 September 27, 2018 Page 3 A0.1, A1.1, A1.2, A2.1, A2.2, A3.1, and A4.1, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROTECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions, of approval set forth shall be incorporated into and annotated on the first page of the building plans. 4. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. ASA -2018-07 shall be applicable to this approval. 5. PREVIOUS APPROVAL CONDITIONS The conditions of approval contained in file nos. U-2000-14 and EXC-2000-10 shall be applicable to this approval. 6. BUILDING AND FIRE CODE The applicant shall apply for and obtain building permits to allow the construction of the approved project. The applicant shall provide information and plans to allow the Building Official and the Fire Marshall or their designee that the proposed plans comply with Building and Fire Codes in effect at the time of application for a building permit. 7. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS a) All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. b) Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c) Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during the nighttime period as defined in Section 10.48.053(b) of the Municipal Code. Resolution No. 96 DP -2018-06 September 27, 2018 Page 4 d) Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of the Cupertino Municipal Code. e) Rules and regulations 'pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f) The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. g) The applicant shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated 8. DUST CONTROL The following construction practices shall be implemented during all phases of construction for the proposed project to prevent visible dust emissions from leaving the site: a) Water all active construction areas at least twice daily and more often during windy periods to prevent visible dust from leaving the site; active areas adjacent to windy periods; active areas adjacent to existing land uses shall be kept damp at all times, or shall be treated with non-toxic stabilizers or dust palliatives. b) Cover all trucks hauling soil, sand, and other loose materials or require all trucks to maintain at least 2 feet of freeboard; c) Pave, apply water at least three times daily, or apply (non-toxic) soil stabilizers on all unpaved access roads, parking areas and staging areas at construction sites. d) Sweep streets daily, or more often if necessary (preferably with water sweepers) if visible soil material is carried onto adjacent public streets. e) The applicant shall incorporate the City's construction best management practices into the building permit plan set. 9. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 10. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, Resolution No. 96 DP -2018-06 September 27, 2018 Page 5 the "indemnified parties") from and against any claim, action, or proceeding brought by a third party against one or more of the. indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys' fees and costs within 30 days following receipt of invoices from City. Such attorneys' fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 11. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 -day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 27th day of September, 2018 at a noticed Administrative Hearing of the City of Cupertino, State of California, held by the Administrative Hearing Officer, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: /s/Ellen Yau Ellen Yau Associate Planner APPROVED: /s/Benjamin Fu Benjamin Fu Assistant Director of Community Development ASA -2018-07 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 97 OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL PERMIT TO ALLOW FOR A 1,016 SQ. FT. SECOND FLOOR ADDITION LOCATED AT 10104 VISTA DRIVE (APN 316-24-059) .SECTION I: PROTECT DESCRIPTION Application No.: ASA -2018-07 Applicant: Josh Selo (West Valley Community Services) Location: 10104 Vista Drive SECTION II: FINDINGS FOR ARCHITECTURAL AND SITE APPROVAL PERMIT: WHEREAS, the City of Cupertino received an application for an Architectural and Site Approval to consider allowing a 1,016 sq. ft. second story addition, as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting in regard to the application; and WHEREAS, the project is determined to be exempt from the California Environmental Quality Act (CEQA); and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: 1. The proposed development, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The current building is a two-story administrative office for West Valley Community Services and is located towards the interior of the property with one elevation facing Vista Drive and visible from the public right-of-way. The zoning district allows the construction Resolution No. 97 ASA -2018-07 September 27, 2018 Page 2 of building of up to 45 feet in height while the existing building is measured at 28'. The proposal is a second story addition, that will not further increase the height of the building but will modify the western and northern elevation. However, even with the addition there will continue to be sufficient setback from adjacent properties. In addition, the proposed addition is located directly above an existing single story portion of the building and will not increase the existing footprint of the building. Therefore, the proposal will not be detrimental or injurious to property or improvements in the vicinity. 2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. The scale of the building will be maintained with no changes to the height of the building. Although the addition will increase the floor area of the building and increase the volume, the proposal maintains varied wall and roof setbacks that will provide architectural articulation. Additionally, architectural features such as consistent roof brackets and locations, and the installation of a new wood trellis will further enhance the addition and mitigate the overall building mass. b) In order to preserve design harmony between new and existing building and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments, and provide shielding to prevent spill-over light to adjoining property owners. The new addition will utilize the existing horizontal and vertical paneling patterns to preserve design harmony and integrity. The location of utility and storage areas remain unchanged and located at the rear of the building. Furthermore, existing trees in the front are preserved and will help to mitigate impacts of the addition to the public right-of-way. Resolution No. 97 ASA -2018-07 September 27, 2018 Page 3 c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. Signage approval is not included in this application and the applicant does not wish to propose any new signage. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. Additional windows are proposed on the second floor, but the height of the windows are six feet in height measured from finished floor to window sill and will, therefore, not create privacy issues to the existing residences to the north. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff's report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 4 thereof,: The application for a Architectural and Site Approval, Application no. ASA -2018-07 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Hearing record concerning Application no. ASA -2018-07 as set f orth in the Minutes of the Administrative Hearing Meeting of September 27, 2018 and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set drawn by Adaptive Architecture entitled "West Valley Community Services Office Addition" consisting of seven (7) sheets labeled as A0.1, A1.1, A1.2, A2.1, A2.2, A3.1, and A4.1, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROTECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property Resolution No. 97 ASA -2018-07 September 27, 2018 Page 4 size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 4. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. DP -2018-06 shall be applicable to this approval. 5. PREVIOUS APPROVAL CONDITIONS The 'coriditions of approval contained in file nos. U-2000-14 and EXC-2000-10 shall be applicable to this approval. 6. EXTERIOR BUILDING MATERIALS/TREATMENTS The final building exterior plan shall closely resemble the details shown on the original approved plans. Final building exterior treatment plan (including but not limited to details on exterior color, materials, architectural treatments, doors, windows, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits to ensure quality and consistency. Any exterior changes determined to be substantial by the Director of Community Development shall either require a modification to this permit or a new permit based on the extent of the change. 7. SCREENING All mechanical and other equipment on the building or on the site shall be screened so they are not visible from public street areas or adjoining developments. Screening materials/colors shall match building features and materials. The height of the screening shall be taller than the height of the mechanical equipment that it is designed to screen. The location of equipment and necessary screening shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. 8. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. Resolution No. 97 ASA -2018-07 September 27, 2018 Page 5 9. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the "indemnified parties") from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys' fees and costs within 30 days following receipt of invoices from City. Such attorneys' fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 10. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 -day period complying with all of the requirements of. Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 27th day of September, 2018 at a noticed Administrative Hearing of the City of Cupertino, State of California, held by the Administrative Hearing Officer, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: /s/Ellen Yau Ellen Yau Associate Planner APPROVED: /s/Benjamin Fu Benjamin Fu Assistant Director of Community Development APPROVAL :D iP>11r.19-01 1 Appliicc%atiorn� Number 1 Dai Case anfar WEST VALLEY COMMUNITY 5ERVI CE5 Off ICE ADDITION DRAWING SYMBOL LEGEND N PROJECT NORTH 2 3 COLUMN REFERENCE GRIDS 8,23 = COLUMN DESIGNATION B - I ABBREVIATIONS 4 4 And F.O.S. Face of Studs SECT. Section L Angle FT. Foot or Feet 5H Shelf Q At FTG. Footing 5HT. Sheet 2L Centerline FW Fire Water 5HWR. Shower -0 Diameter or GA. Gauge SIM. SPEC. Similar Specification Round GALV. Galvanized 5Q. Square d Penny (Nails) G.B. Grab Bar 55T. Stainless # Pound GI Galvanized 1 1. BUILDING HEIGHT: Steel (E) Existing Iron STD. Standard A New GL. Glass 5TL. Steel Relocated GND. Ground STOP. Storage ACG Accessible GR. Grade 5TRUCT.Structural A/C Air G5 Galvanized 5U5P. Suspended Conditioning Steel 5YM. Symmetrical A.C. Asphaltic GYP. Gypsum SYS. System Conic. ACOUS. Acoustical H.B. Hose Bibb T.B. Towel Bar A.D. Area Drain H.C. Hollow Core TEL. Telephone -ADJ. Adjustable HDR. Header TER. Terrazzo ALT. Alternate HDWD. Hardwood THK. Thick ALUM. Aluminum HDWP.. Hardware T.4 G. Tongue E APPROX.Approximate H.M. Hollow Metal Groove ARCH. Architectural HORIZ. Horizontal T.O.C. To of Curb HT. Height T.O.C.D.Top of BD. Board Concrete BITUM. Bituminous I.D. Inside Deck BLDG. Building Diameter T.O.P. Top of BLK.Block IN5UL. Insulation Pavement/ 13LKG. Blocking INT. Interior Top of B.M. Bench Mark Parapet BFP. Backflow JAN. Janitor T.O.R.D.Top of Roof Prevent Deck BOT. Bottom KIT. Kitchen T.O.S. Top of CAB. Cabinet LAB. Laboratory T.O.W. Sheathing Top of Wall C.B. Chalk Board LAM. Laminate TRD. Tread CEM. Cement LAV. lavatory T.5.W. Top of GER. Ceramic LKR. Locker Sidewalk C.I. Cast Iron LT. Light T.V. Television C.J. Const. Joint TYP. Typical C.L. Chain Link MAINT. Maintenance CLG. Ceiling MAT. Material U.L. Underwriters CLP. Clear MAX. Maximum Laboratory CNTR. Counter M.B. Machine Bolt U.N.O. Unless Noted COL. Column M.D.F. Medium Otherwise CONC. Concrete Density U.O.N. Unless CONN. Connection fiberboard Otherwise CONST. Construction MECH. Mechanical Noted CONT. Continuous MEMS. Membrane CORR. Corridor MEZZ. Mezzanine V.C.T. Vinyl CPT. Carpet MFR. Manufacturer Composition CT5K. Countersunk MH. Manhole Tile CTR. Center MIN. Minimum VERT. Vertical CW. Cold Water MIR. Mirror VEST. Vestibule MISC. Miscellaneous V.T.R. Vent Through DBL.Double M.O. Masonry Roof DEPT. Department Opening V.W.G. Vinyl Wall D.F.Drinking MTD. Mounted Covering Fountain / MTL. Metal Douglas Fir MUL. Mullion W West DIA. Diameter w/ With DAG. Diagonal N North W.G. Water Closet DIM. Dimension N.I.C. Not In WD, Wood DISP. Dispenser Contract WDW. Window -0N. Down No. or # Number W/O Without DR. Door NOM Nominal W.5. Wood Screw D5. Downspout N.T.5. Not To Scale WT. Weight D.5.P. Dry StandPipe W.W.F. Welded Wire DTL. Detail OD Outside Fabric DWG. Drawmg Diameter DWR. Drawer O.A. Overall O.C. On Center EA. Each OFF. Office E.J. Expansion ORP. Opposite Joint OPER Operable EL. Elevation ELEC. Electrical P.L.C.C. Plastic Laminate ELEV.Elevator Covered EMER. Emergency Casework ENCL. Enclosure PA Planting Area EQ. Equal PH Panic Hardware EQPT. Equipment PLA5. Plaster E.W. Each Way PLYWD. Plywood EXH. Exhaust PNL. Panel EXP. Ex ansion PR. Pair EXT. Exterior PT. Point P.LAM. Plastic Laminate F.A. Fire Alarm F.D. Floor Drain Q.T. Quarry Tile FDN. Foundation F.E. Fire R Riser Extinguisher R.D. Roof Drain FEC Fire REP. Reference Extinguisher REFR. Refrigerator Cabinet REG, Register F.F. Finish Floor REINF. Reinforced F.G. Finish Grade REQ. Required F.H. Flat Head RESIL. Resilient FHC Fire Hose Cab. R.H Round Head FIN. Finish RM. Room FLASH. Flashing R.O. Rough Opening FLR. Floor RWD. Redwood FLUOR. Fluorescent F.O.C. Face of Conic. 5. South F.O.F. Face of Finish 5.C. Solid Core F.O.M. Face of SCHED. Schedule Masonry WEST VALLEY COMMUNITY 5ERVI CE5 Off ICE ADDITION DRAWING SYMBOL LEGEND N PROJECT NORTH 2 3 COLUMN REFERENCE GRIDS 8,23 = COLUMN DESIGNATION B - I 10 1 04 V 15TA DRIVE CUPERTINO, CA 95014 APPLICABLE CODES 201 G BUILDING STANDARDS ADMINISTRATIVE CODE PART 1, TITLE 24 C.C.R. 201 G CALIFORNIA BUILDING.CODE (CBC) PART 2, TITLE 24 C.C.R. (2015 INTERNATIONAL BUILDING CODE (IBC) W/ CALIFORNIA AMENDMENTS. 201 G CALIFORNIA PLUMBING CODE (CPG) 201 G CALIFORNIA MECHANICAL CODE (CMG) 201 G CALIFORNIA ELECTRICAL CODE (CEC) 201 G CALIFORNIA FIRE CODE (CFC) 201 G CALIFORNIA GREEN BUILDING CODE 201 G CALIFORNIA ENERGY CODE CUPERTINO MUNICIPAL CODE PROJECT TEAM OWNER WEST VALLEY COMMUNITY SERVICES CONTACT: JOSH SELO 10104 VI5TA OR CUPERTINO, CA 95014 (408) 95G -G 1 13 ARCHITECT ADAPTIVE ARCHITECTURE CONTACT: JANICE YEH 20111 5TEVEN5 CREEK BLVD SUITE 270 CUPERTINO, CA 95014 (408) 8G5-1089 LOBBY ELEVATION 4 4 = ELEVATION DESIGNATION A5.1 A5.1 = REFERENCE DRAWING NUMBER 900 ARROW INDICATES DIRECTION OF VIEW 1 BUILDING SECTION G = SPACE USE - REF SPACE USE SCHEDULE 900 = FLOOR AREA - SQUARE FEET C = SECTION DESIGNATION C -- A5.2 = REFERENCE DRAWING NUMBER A5.2 ARROW INDICATES DIRECTION OF VIEW REF 51GNAGE SCHEDULE WALL SECTION E -- E = SECTION DESIGNATION A5.3 A5.3 = REFERENCE DRAWING NUMBER 7. FLOOR AREA (PROPOSED) ARROW INDICATES DIRECTION OF VIEW W U ULLJ DETAIL 10 10 = DETAIL DESIGNATION b.3 8.3 = REFERENCE DRAWING NUMBER 10 1 04 V 15TA DRIVE CUPERTINO, CA 95014 APPLICABLE CODES 201 G BUILDING STANDARDS ADMINISTRATIVE CODE PART 1, TITLE 24 C.C.R. 201 G CALIFORNIA BUILDING.CODE (CBC) PART 2, TITLE 24 C.C.R. (2015 INTERNATIONAL BUILDING CODE (IBC) W/ CALIFORNIA AMENDMENTS. 201 G CALIFORNIA PLUMBING CODE (CPG) 201 G CALIFORNIA MECHANICAL CODE (CMG) 201 G CALIFORNIA ELECTRICAL CODE (CEC) 201 G CALIFORNIA FIRE CODE (CFC) 201 G CALIFORNIA GREEN BUILDING CODE 201 G CALIFORNIA ENERGY CODE CUPERTINO MUNICIPAL CODE PROJECT TEAM OWNER WEST VALLEY COMMUNITY SERVICES CONTACT: JOSH SELO 10104 VI5TA OR CUPERTINO, CA 95014 (408) 95G -G 1 13 ARCHITECT ADAPTIVE ARCHITECTURE CONTACT: JANICE YEH 20111 5TEVEN5 CREEK BLVD SUITE 270 CUPERTINO, CA 95014 (408) 8G5-1089 LOBBY CODE ANALYSIS HEART OF THE CITY SPECIAL AREA E1 6 LOBBY = ROOM NAME SCOPE OF WORK 900 E I =OCCUPANCY GROUP 1 45 , G = SPACE USE - REF SPACE USE SCHEDULE 900 = FLOOR AREA - SQUARE FEET THE PROJECT SCOPE OF WORK INCLUDES THE FOLLOWING: BLDG 2 3,445 SF BLDG 3 9,924 5F 45 = OCCUPANT LOAD ( CBC TABLE I O -A) = OCCUPANT LOAD SIGN REQUIRED WHEN NOTED - (CBC SEC 1002.3 ) 1. A 1,0 1 G 5Q. FT. ADDITION TO EXISTING 2-5TORY ADMINISTRATIVE BUILDING (CCS BLDG). REF 51GNAGE SCHEDULE >0 Lo FFE0'-0" LEVEL LINE, CONTROL POINT FFE 0-0" = ELEVATION MATCH LINE AND AREA Q DESIGNATOR SHADED PORTION 15 THE SIDE CONSIDERED CENTER LINES, FLOOR LINES AND LEVEL LINES ---- SECTION LINES ----- PROPERTY LINES, BOUNDRY LINES AND MATCH LINES - - - - HIDDEN CONSTRUCTION FEATURE BREAKS OF BUILDING COMPONENTS REVISION 2�cj 3 = REVISION NUMBER GLAZED OPENING OR WINDOW TYPE so DOOR IDENTIFICATION 50 = DOOR NUMBER CODE ANALYSIS A. BUILDING CODE ANALY515: TYPE OF CONSTRUCTION: V -B OCCUPANCY TYPE: B AUTOMATIC FIRE SPRINKLER.? YE5 BASIC ALLOWABLE AREA PER CBC TABLE 503: 27,000 5F PPOP05ED BUILDING AREA: G, 193 SF B. PLUMBING FIXTURE CALCULATIONS (CPG TABLE 422.1) NUMBER OF OCCUPANTS PER CPC TABLE A: G. 193 / 200 = 3 1 OCCUPANTS o PLUMBING FIXTURES: (BASED ON 16 MALE 4 I G FEMALE OCCUPANTS) MALE FEMALE W.C. I URINAL I LAV W.C. LAV REQUIRED 1 I 1 2 I PROVIDED 2 1 O 1 2 2 2 o DRINKING FOUNTAIN: I REQUIRED, I WATER COOLER PROVIDED VICINITY MAP DRAWING INDEX ARCH ITECTU RAL PROJECT INFO, DRAWING INDEX, A RENDERING 51TE PLAN ENLARGED SITE PLAN FIRST FLOOR EXISTING 6 PROPOSED PLANS SECOND FLOOR EXISTING E PROPOSED PLANS SECTIONS 4 ELEVATIONS EXISTING S PROPOSED ROOF PLANS PARKING ANALYSIS PROJECT DATA EXI5TING FACILITY 1. ASSESSOR'S PARCEL NO.: 31 G-24-0594 USE AREA PARKING I NO. OF 5TALL5 � -.1 - - - (5Q. FT.) PATIO OFFICE (NET) 4,1 G9 1/285 MULTI -FAMILY 2 PER 2-15R RESIDENTIAL I PER I -BR PARKING STALLS NEEDED TOTAL PARKING STALLS PROVIDED PROPOSED FACILITY USE OFFICE (NET) MULTI -FAMILY RESIDENTIAL AREA PARKING (SQ. FT.) PATIO 4,843 1/285 2 PER 2 -BR I PER I -BR PARKING STALLS NEEDED NEEDED 4. LAND USE: HEART OF THE CITY SPECIAL AREA - U 5. LOT AREA: G. FLOOR AREA (EXISTING): 1 3G DRAWING INDEX ARCH ITECTU RAL PROJECT INFO, DRAWING INDEX, A RENDERING 51TE PLAN ENLARGED SITE PLAN FIRST FLOOR EXISTING 6 PROPOSED PLANS SECOND FLOOR EXISTING E PROPOSED PLANS SECTIONS 4 ELEVATIONS EXISTING S PROPOSED ROOF PLANS PARKING ANALYSIS PROJECT DATA EXI5TING FACILITY 1. ASSESSOR'S PARCEL NO.: 31 G-24-0594 USE AREA PARKING I NO. OF 5TALL5 � -.1 - - - (5Q. FT.) PATIO OFFICE (NET) 4,1 G9 1/285 MULTI -FAMILY 2 PER 2-15R RESIDENTIAL I PER I -BR PARKING STALLS NEEDED TOTAL PARKING STALLS PROVIDED PROPOSED FACILITY USE OFFICE (NET) MULTI -FAMILY RESIDENTIAL AREA PARKING (SQ. FT.) PATIO 4,843 1/285 2 PER 2 -BR I PER I -BR PARKING STALLS NEEDED NEEDED TOTAL PARKING STALLS PROVIDED 1 52 BICYCLE PARKING CC5 BLDG AREA PARKING NO. OF 5TALL5 NO. OF STALLS (5Q. FT.) RATIO NEEDED NEEDED G, 193 1/1,250 5 5 n 4. LAND USE: HEART OF THE CITY SPECIAL AREA 15 U 5. LOT AREA: G. FLOOR AREA (EXISTING): 5 1,270 50 FT (1. 18 ACRES) BLDG I 3,446 5F 3G W BLDG 2 3,445 SF BLDG 3 9,924 5F 52 CC5 BLDG 5,177 5F >0 Lo � Q TOTAL 21,993 5F 52 7. FLOOR AREA (PROPOSED) ADDITION OF OFFICES AND W U ULLJ z o� CONFERENCE ROOM ON THE 2ND FLOOR OF THE CC5 BUILDING, W � J0U - APPROXIMATELY 1,0 1 G SQ. FT. CC5 BLDG WILL BE G. 193 5F TOTAL FLOOR AREA WILL BE NO. OF STALLS NEEDED 8. LOT COVERAGE: 9. CONSTRUCTION TYPE: 23,009 5F 33% V -B 17 3G 10. 5ETBACK5: SEE DIMENSIONS ON A I. 14 A I. 53 1 1. BUILDING HEIGHT: 28' (2 -STORY) TOTAL PARKING STALLS PROVIDED 1 52 BICYCLE PARKING CC5 BLDG AREA PARKING NO. OF 5TALL5 NO. OF STALLS (5Q. FT.) RATIO NEEDED NEEDED G, 193 1/1,250 5 5 n U W ito Z >0 Lo � Q � W U ULLJ z o� W � J0U - (S) W ^� Janice T. Yeh � p � C-33243 3 c; s� Efa.W,3i119 = ADAPTIVE ARCHITECTURE 20111 STEVENS CREEK BLVD SUITE 270 CUPERTINO, CA 95014 (408) 865-1089 0 711e LANNING SUBMITTAL Q 29119 LANNING SUBMITTAL Q3123115 REUM REVIEW Q 12115117 LANNING MTG Q iG117 I REUM REVIEW NO DATE BY DESCRIPTION REVI510N5 DRAWN: JYCHECKED: DATE: SCALE: AS NOTED PROJECT NUMBER: PROJECT INFO, DRAWING INDEX, & RENDERING DRAWING /� O. 1 NUMBER: /`'� �7 APPROVAL Application Number �Y� a 1 1'a cg' iG jeir 5-13IKE CAPACITY BICYCLE RACK ON NEW 7'X7' CONC PAD W Q (E) PYFU5 CALLERIANi 'Ct1ANTICLEER', TYP. @ STREET FRONTAGE I . ALL EXTERIOR STORM DRAIN INLETS ON THE PARCEL MUST BE CLEARLY MARKED WITH "NO DUMPING FLOWS TO CREEK" OR "NO DUMPING FLOWS TO BAY'. COORDINATE WITH ALEX WYKOFF WITH CITY OF CUPERTINO PUBLIC WORKS DEPARTMENT ON DRAIN INLET MARKERS. 2. A COMPLETED CONSTRUCTION AND DEMOLITION (C*D) WASTE MANAGEMENT PLAN MUST BE SUBMITTED AT THE TIME OF DEMOLITION AND/OR BUILDING PERMIT ISSUANCE. IF BOTH DEMOLITION AND CONSTRUCTION PERMITS WILL BE ISSUED, CED WASTE MANAGEMENT MUST BE SUBMITTED FOR EACH PERMIT. IF THE PERMIT APPLICANT AND/OR THEIR CONTRACTOR AND ANY SUBCONTRACTOR WORKING ON THE PROJECT SELF -HAULS THE C8D MATERIAL, A WASTE MANAGEMENT REPORT MUST BE SUBMITTED PRIOR TO FINAL APPROVAL OF THE DEMOLITION / BUILDING PERMIT DEMONSTRATING A MINIMUM OF G5% OF THE C$D WASTE HAS BEEN DIVERTED FROM LANDFILL AND RECYCLED. PLEASE NOTE THAT C0 DEBRIS BOX SERVICE MAY ONLY BE OBTAINED FROM RECOLOGY, THE CITY5 FRANCHISED WASTE HAULER. C*D RECYCLING INFORMATION AND REPORTS MAY BE DOWNLOADED AT WWW.CUPERTINO.ORG/GREENDEV GENERAL NOTES SITE PLAN I lil o = I' -o° \I U ) W U ISL LLJ V J 77 0 w� z�- �/m Q Q U �< j0 UU WLu z o� LLJ JD U Q F-- W UIUIU .. Janice T. Yeh . C-33243 sV; ...... ADAPTIVE ARCHITECTURE 20111 STEVENS CREEK BLVD SUITE 270 CUPERTINO, CA 95014 (408) 865-1089 Q nrla LANNING 5UBMITTAL Q 29/15 LANNING5UBMITTAL A3/231! 5 RELIM REVIEW Q 12/I 6117 LANNING MTG A[-1117 RELIM REVIEW NO I DATE BY DESCRIPTION REVISIONS DRAWN:JY CHECKED: DATE: SCALE: AS NOTED PROJECT NUMBER: SITE PLAN DRAWING A1.1 NUMBER: lq?4q _. f7 APIPROYVAL C�.n. Cks; r 7'-4" 25'-6' SECOND FLOOR 1 30-2• 10.10. k w ry 0 Q IPA C d U v v FLOOR AREA DIAGRAM 1116" = I' -o" 2 ENLARGED SITE PLAN I I I G __�agED ARC�r^�G j Janice T. Yeh^ C-33243 3 073lil9 == ..... ADAPTIVE ARCHITECTURE 20111 STEVENS CREEK BLVD SUITE 270 CUPERTINO, CA 95014 (408) 865-1089 A)17118 LANNING 5UBMITTAL Q M15 LANNING 5UBMITTAL Q /23/13 RELIM REVIEW 0 112116117 LANNING MTG Q i6'17 RELIM REVIEW NO I DATE BY DE5CRIPTION PEV1510N5 DRAWN:JY CHECKED: DATE: 5CALE: AS NOTED PROJECT NUMBER: ENLARGED SITE PLAN DRAWING A 1.2 NUMBER: LEGEND ® 5TAFF OFFICE5 MEETING ROOMS FOOD PANTRY RECEPTION COMMUNITY ROOM ® RESIDENTIAL LAUNDRY FACILITY UTILITY, 5TORAGE, BREAKROOM, RESTROOM ELEVATOR � HALLWAY w ry 0 Q IPA C d U v v FLOOR AREA DIAGRAM 1116" = I' -o" 2 ENLARGED SITE PLAN I I I G __�agED ARC�r^�G j Janice T. Yeh^ C-33243 3 073lil9 == ..... ADAPTIVE ARCHITECTURE 20111 STEVENS CREEK BLVD SUITE 270 CUPERTINO, CA 95014 (408) 865-1089 A)17118 LANNING 5UBMITTAL Q M15 LANNING 5UBMITTAL Q /23/13 RELIM REVIEW 0 112116117 LANNING MTG Q i6'17 RELIM REVIEW NO I DATE BY DE5CRIPTION PEV1510N5 DRAWN:JY CHECKED: DATE: 5CALE: AS NOTED PROJECT NUMBER: ENLARGED SITE PLAN DRAWING A 1.2 NUMBER: III MEETING RM AP RUVAL f,-/,� ��� (E) EXTERIOR RA -RATED a,a 6_T (� (r EXTERIOR WALL A31 qa., Signature LAUNDRY - = --- -� LAUNDRY i .'- gar RESIDENTIAL n Fl RESIDENTIAL COMMON COMMON ROOM ROOM STOP. STOP. ELEV. MEETING RM MACH. RM ELEC. ROOM I k ♦ WC WC MEETING RM -._... .. .... ........ i i II II MEETING RM I I II �II I I EXISTING WALL TO BE I I II II REMOVED EXISTING GLA55 BLOCK WALL AND DOOR TO Bq \ REMOVED t SALVAGED L FOOD PANTRY RECEPTION DESK UP LOBBY/ WAITING AREA MEETING RM 61foy' I 5TOR. ELEV. MEETING RM �V V/ MACH. 7 RM ELEC. ROOM }� f 4'-214" `♦ ♦ s WC WC X 1'-0" MINI / `♦ MEETING RM ; ELEV?♦ 1, 2 I I I I I 19'-1 CU4' I PPOP05EDADD'L L ---__J MEETING RM 4'-5" FOOD 5TORAGE Rr LOBBY/ WAITING AREA ARE-I1\15TALL GLA55 BLOCKS @ NEW WALL GECEPHDESK FOOD PANTRY I N I N T 6 A3.1 EX15TING 15T FLOOR PLAN 114" = 1'-o" 2 PROPOSED 1ST FLOOR PLAN 114° = 1'-0° (o U ' W Tl Z ItO O ® IT) �Q ICU �o W z UU o� LLJ LL -O D Lu 10 U V W �gVY1�11111U •• ED AR^ Janice T. Yehp C-33243 s`; 3`T l•1fx: WliU19 =� ...... ADAPTIVE ARCHITECTURE 20111 STEVENS CREEK BLVD SUITE 270 CUPERTINO, CA 95014 (408) 865-1089 0 0 7711b LANNING5UBMITTAL Q612911a LANNING5UBMITTAL 0 23119 RELIM REVIEW Q 12716/17 LANNING MTG Q 1W17 REUM REVIEW NO I DATE I BY DESCRIPTION PEV1510N5 DRAWN:JY CHECKED: DATE: 5CALE: AS NOTED PROJECT NUMBER: FIRST FLOOR EXISTING & PROPOSED PLANS DRAWING %\ 2. 1 NUMBER: /� u I iq6A - "'-cl6 AE U �9i.-C�,l�`'a' VJ r :`5pplica?6o)l tiumber DRC �4C., 0- Signature EXTENT OF FIR5T FLOOR ROOF5 BELOW OFFICE EX15TING WALL TO BE / REMOVED rrI Itl EXISTING WALL TO BE ►j j II� REMOVED II I II II ISI III EXISTING WALL TO BE Ill REMOVED II II OPEN OFFICE STAFF LUNCHROOM i lemil[d7 OFFICE EXI5TING WALL, CLO5ET, AND DOOR5 TO BE REMOVED II pp CII J� O O 40 4 O OIL II l F� qu1 II OFFICE CONFERENCE ROOM 2'-G" X 2'-G" WINDOW, 45 -MIN. FIRE RATED. TYP. OF (4) ®l, N OFFICE 1 95 5Q.FT. OFFICE 2 95 5Q.FT. —I 3, 4 24 --la' 8 A3.1 A3.1 II I II II OARD ROOM I 537 SQ. •II II II I II r ----- I IF~OPERABLE r ----- I I I II PARTITION 1 I I II I COUNTER I ro. 1'-0" MIN. L --- STORAGE FILE DRAWERS 4'-5" 00 WC (E) WC (E) OFFICE 3 95 SQ.Ff. 1 I I I I: I I DN I I I I 3 4 NEW GLASS 5 G PARTITION �JG'MIN. il4'-10" OPEN lOFFICE OFFICE 4 G� 89 SQ.FT. a� 7 8 10'-0" 5'-2" I0'-8" I -HR FIRE RATED EXTERIOR WALL i 4 STAFF LUNCHROOM (E) 4'-O" OFFICE 5 (E) OFFICE G (E) OFFICE 7 (E) N � N 6 A3.1 EXI5TING 2ND FLOOD PLAN lig" = I' -o" 2 PROPOSED 2ND FLOOR PLAN I I L' U W �gE0 ARCy�' _-vv Fes, i� Janice T. Yeh C-33243 3• .p Niko U19 =c ADAPTIVE ARCHITECTURE 20111 STEVENS CREEK BLVD SUITE 270 CUPERTINO, CA 95014 (408) 865-1089 - 0 Qm1a LANNING5UBMITTAL 0 29na LANNING5UBMITTAL 0 2318 RELIM REVIEW Q 1211GI17 LANNING MTG Q 16117 IRELIM REVIEW NO DATE BY DE5CRIPTION REV1510N5 DRAWN:JY CHECKED: DATE: SCALE: AS NOTED PROJECT NUMBER: SECOND FLOOR EXISTING & PROPOSED PLANS DRAWING A2.2 NUMBER: A A _ — APPROVAL WEST ELEVATION - EXISTING I Iia^ = I --o° 1 2 — ror s -z irz• 1 4 111 Hill 11111 — esscnec sa.a� i COMPOSITION HORIZONTAL WOOD VERTICAL WOOD SIDING SHINGLE ROOF TO 51DING TO MATCH (E) TO MATCH (E) MATCH (E) / ----- 2ND FLDODDIF RA'ON I I I _ a I .1=. L�wlmmm (N) ROOF BRACKET L (N) WOOD TRELLIS L (N) ROOF BRACKET (E) ROOF BRACKET TO MATCH (E) TO MATCH (E) TO MATCH (E) WEST ELEVATION - PROPOSED WINDOW SIZE TO HORIZONTAL WOOD MATCH (E), W/ VERTICAL WOOD SIDING TO MATCH (E) 45 -MIN PIPE RATING SIDING TO MATCH (E) ----- 2ND --FLO—O--R ITIO—--N--------- / A TM I I �I I it - II I� I I I - I I i - _ (E) WOOD TRELLIS TO L (N) ROOF BRACKET RFAAAIM Tn AAATrH /Fl ALLOWABLE OPENING CALCULATION: I -HR RATED WALL AREA = G40 SF OPENING AREA = 25 (WDW5) + 21 (DOOR) = 4G 5F 4G / G40 = 7% <25% OF WALL NORTH ELEVATION - EXISTING Iia" = I' -o" 4 NORTH ELEVATION - PROPOSED liar = II -01, 1 3 1 EXISTING NORTH WEST CORNER 11111 111 1111 111 Hill 11111 i OPEN OFFICE J BOARD ROOM --------------- WG 5TORAGE _ 4 ——y EAST -WEST SECTION lib" = I' -o" 6 NORTH -SOUTH SECTION 1i8 = I -0 5 1 EXISTING WEST ELEVATION I I I I V J W U CJ161.11=1 I__! V J ®_ Lu It �Ln ® I) ® U U z UU o� W LL- O 7) J ® U W lulufUlUIUI ' ,tD A,p- ' j� Janice T. Yeh �p C-33243 sf LTi 07(illl9 =� •' I4rnta�nKao�c ..... ADAPTIVE ARCHITECTURE 20111 STEVENS CREEK BLVD SUITE 270 CUPERTINO, CA 95014 (408) 865-1089 D 0 mla CANNING SUBMITTAL Q 9/18 LANNING 51,15MITTAL 03123118 RELIM REVIEW Q 1211 FJ17 FANNING MTG AL/17 RELIM REVIEW NO I DATE I BY DESCRIPTION REVISIONS DRAWN:JY CHECKED: DATE: SCALP: AS NOTED PROJECT NUMBER: SECTIONS & ELEVATIONS DRAWING /� 3. 1 NUMBER: /'"'� Application Numb©r T Date a S EE 1 3t PE- I I ----------------- L I I I I r------------�--I ---� FACE OF BUILDING BELOW i FACE OF BUILDING I — --- — — — — — — —— L ----- I I (E) SLOPE (E) SLOPE I ------------------- (E) SLOPE (E) SLOPE -� ------------------------------- I I I I I I I i — F — I I I I � I I I EXISTING COMPOSITION EXISTING COMPOSITION SHINGLES ROOF I SHINGLES ROOF IU73- J _ I I I � I I I I I I I I I I I I I I I I I (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE _ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I EXI5TING ROOF BELOW I EXISTING ROOF BELOW I N I N I I I ----------------L----------------J ROOF DEMOLITION PLAN 1/4" = 1'-0" F2 PROPOSED ROOF PLAN 11411= I -o W U_ Cz W (^ J �z � z 0 >o FvLn �Q �U �O W UU z o� o� w 0� J U Q V W .............. ��aSED AR�•y^c�'�i Janice T. Ye C-33243 ,:,[i: 07,31i10 FOFCAc_ ...... ADAPTIVE ARCHITECTURE 20111 STEVENS CREEK BLVD SUITE 270 CUPERTINO, CA 95014 (408) 865-1089 0 Q mIs LANNING50MITTAL 0 231 1e LANNING5U8MITTAL Q /23/15 RLIM REVIEW Q I�I�n CANNING MTG Q nv•7 RELIM REVIEW NO I DATE BY DESCRIPTION REVISIONS DRAWN:JY CHECKED: DATE: SCALE: AS NOTED PROJECT NUMBER: EXISTING & PROPOSED ROOF PLANS DRAWING PA 1 NUMBER: