HomeMy WebLinkAboutAH Packet 9-27-2018CITY OF CUPERTINO
AGENDA
C U P E RT I N O ADMINISTRATIVE HEARING
10300 Torre Avenue, City Hall Conference Room C
Thursday, September 27, 2018
5:00 PM
ROLL CALL
APPROVAL OF MINUTES
1. Subject: Draft Minutes of August 9, 2018
Recommended Action: approve or modify the Draft Minutes of August 9, 2018
Draft Minutes of August 9, 2018
ORAL COMMUNICATIONS
This portion of the meeting is reserved for persons wishing to address the members on
any matter not on the agenda. Speakers are limited to three (3) minutes. In most cases,
State law will prohibit the members from making any decisions with respect to a matter
not listed on the agenda
WRITTEN COMMUNICATIONS
PUBLIC MEETINGS
2. Subject: Architectural and Site Approval to consider allowing a 1,161 square foot
first floor and 326 square feet second floor addition to an existing duplex;
(Application No.: ASA -2017-06; Applicant: Susan Chen; Location 22861 Medina
Lane; APN No.(s): 342-30-013)
Recommended Action: That the Hearing Officer adopt the draft resolution to:
1. Find that the project is exempt from CEQA; and
2. Approve the Architectural and Site application
Administrative Hearing Officer's decision final unless appealed
Staff Report
1 - Draft Resolution for ASA -2017-06
2 - Plan Set
3 - Public Comment
3. Subject: Development Permit and Architecural and Site approval to consider
Page 1
Administrative Hearing AGENDA September 27, 2018
allowing a 1,016 square foot second floor addition to an existing office building.
Application No(s).: DP -2018-06, ASA -2018-07; Applicant(s): West Valley
Community Services (Santa Clara County Fire Protection District); Location:
10104 Vista Drive APN# 316-24-059
Recommended Action: That the Hearing Officer adopts the draft resolutions to:
1. Find that the proposed actions are exempt from CEQA; and
2. Approve the Development Permit (DP -2018-06) and Architectural and Site
Approval (ASA -2018-07)
Administrative Hearing Officer's decision final unless appealed
Staff Report
1 - Draft Resolution for DP -2018-06
2 - Draft Resolution for ASA -2018-07
3 - Plan Set
4 - Parking Study
5 - Vista Village Parking Management Plan
OLD BUSINESS
NEW BUSINESS
STAFF AND COMMITTEE REPORTS
ADJOURNMENT
Page 2
Administrative Hearing AGENDA September 27, 2018
In compliance with the Americans with Disabilities Act (ADA), anyone who is planning
to attend the next meeting who is visually or hearing impaired or has any disability
that needs special assistance should call the City Clerk's Office at 408-777-3223, 48
hours in advance of the meeting to arrange for assistance. Upon request, in advance,
by a person with a disability, meeting agendas and writings distributed for the meeting
that are public records will be made available in the appropriate alternative format.
Also upon request, in advance, an assistive listening device can be made available for
use during the meeting.
Any writings or documents provided to a majority of the members after publication of
the agenda will be made available for public inspection. Please contact the City
Clerk's Office in City Hall located at 10300 Torre Avenue during normal business
hours.
IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal
Code 2.08. 100 written communications sent to the Cupertino City Council,
Commissioners or City staff concerning a matter on the agenda are included as
supplemental material to the agendized item. These written communications are
accessible to the public through the City's website and kept in packet archives. You are
hereby admonished not to include any personal or private information in written
communications to the City that you do not wish to make public; doing so shall
constitute a waiver of any privacy rights you may have on the information provided to
the City.
Members of the public are entitled to address the members concerning any item that is
described in the notice or agenda for this meeting, before or during consideration of
that item. If you wish to address the members on any other item not on the agenda, you
may do so during the public comment.
Page 3
Cupertino, CA 95014
(408) 777-3308
ACTION MINUTES OF THE REGULAR MEETING OF
THE ADMINISTRATIVE HEARING HELD ON August 9, 2018
ROLL CALL
Hearing Officer present: Benjamin Fu, Assistant Director of Community Development
Staff present: Gian Martire, Associate Planner
Catarina Kidd, Senior Planner
Applicant(s) present: Jane Lau, property owner 10550 Bette Ave
Bernard Baker, Project Manager for Tantau 14
Rebecca Tolentino, Planning Manager, Apple Inc.
Chris Grimmer, Landscape Architect, Apple Inc.
APPROVAL OF MINUTES:
1. April 12, 2018
The minutes of April 12, 2018 were approved as written
POSTPONEMENTS/REMOVAL FROM CALENDAR:
None
ORAL COMMUNICATIONS:
None
WRITTEN COMMUNICATIONS:
None
PUBLIC MEETING ITEMS:
2. Application No. (s): R-2018-20, INT -2018-01
Applicant: Clayton Johnson (Lau residence)
Location: 10550 Bette Ave APN#(s): 369-26-016
Front Yard Interpretation to designate the property line along Bette Avenue as the front lot
line to allow for a 198 square foot addition to the first floor and a Two Story Permit to allow a
980 square foot second floor to an existing single -story residence.
Administrative Hearing decision final unless appealed.
2 Administrative Hearing
August 9, 2018
Staff Member Martire addressed the Hearing Officer. The subject lot is a corner lot. The current
Municipal Code calls for the shorter lot line of a corner parcel to be designated as the front
yard. This has caused many of the older housing developments to be non-compliant with
regard to front and side yard setbacks. The City has allowed Interpretations for front yard
definitions for corner lot homes where it can be shown that other corner lots have the same
configuration. Half of the homes (situated on a corner) in the neighborhood have a similar
layout. The applicant would like to add square footage to the first floor and add a second floor
to the existing residence. The additional square footage would not be allowed without a
determination to show the longer lot side as the front yard. Staff has worked with the
applicant for several months to develop a design that meets the current setback requirements
should the Interpretation be granted. One window on the east side of the proposed new
second floor will be required to have privacy tree planting. The neighbor requested a different
of tree species be planted and would like to have the window sill raised 5 feet.
The Hearing Officer asked for clarification of how this lot is compatible with the
neighborhood. Staff member Martire stated that half of the homes along Glenview Avenue
have the same lot configuration as proposed. This allows more light and air for the homes
along Bette Avenue that they otherwise wouldn't have. The Hearing Officer confirmed the
location of the easterly neighbor asking for the window revision. He then asked if the property
owner would like to make a statement. The property owner, Jane Lau, told the Hearing
Officer that she was redesigning her home to make it more comfortable to raising her family
in.
The Hearing Officer opened the public comment period.
David Herbert, 6693 Clifford Dr (property owner to the south) - He feels that the setback
encroachments make the structure too close to his home and will reduce his property value.
Elisa Herbert, 6693 Clifford Dr - She also feels that the encroachment of the addition and the
second story are too close to their house. The backyard privacy has been diminished. She
would like for the tree in the back yard remain to protect privacy.
Jennifer Griffin, a Cupertino resident - she asked if the front yard is determined to be on
another side of the house, does the house address have to change?
Kitty Moore, a Cupertino resident - asked for clarification of the second floor setback is, what
the elevation of the first floor is and what the other structures on the site are
The Hearing Officer closed the comment period.
Staff member Martire said that there is a pool in what is currently the side yard (per
definition). The pool will remain. The second story setback is 25 feet from the eastern property
line. This is consistent with how the City prescribes second story setbacks. It is also 20 feet
from the southern property line. The first floor is between 9 and 10 feet high. The Hearing
Officer asked if the Zoning Code contained any reference to property values or visibility. Staff
member Martire stated that is does not. The Hearing Officer clarified that the house address is
at the functional front of the house which is physically the side of the house and that the house
has been in its current orientation (usability) for 30 years or more. He clarified that the
3 Administrative Hearing
August 9, 2018
addition is not going to be encroaching on existing open spaces. The Hearing Officer referred
to emails that were received by Staff and included in the packet. Staff member Martire
confirmed that they were from the neighbors on the east side of the subject property.
The Hearing Officer stated for the speakers that for these types of projects the Code is very
clear about what the property owner can and cannot do in terms of encroachment setback. In
reviewing the prosed project, Staff evaluated what the impacts to neighboring properties could
be and the overall affect in the neighborhood. They look at the impacts to the existing
properties as well as the reasonable and literal functionality of the subject property. They
cannot take into consideration perceived impacts to visibility, privacy and house values. He
noted that changing the current configuration of the home will still provide adequate
separation per the Municipal Code. The setbacks and lot coverage requirements are being met.
The development lot coverage is being increased from 32% to 35% and is in conformity with
the other homes in the neighborhood.
The Hearing Officer approved the findings on the Staff report.
DECISION: The application was approved by the Hearing Officer per the draft resolutions.
3. Application No. (s): ASA -2018-08, EA -2018-05
Applicant: Bernard Baker (Apple, Inc)
Location: 19020 Pruneridge Ave APN#(s): 316-06-063
Architectural and Site Approval to consider a proposed 85,247 square foot office building
including revisions to the parking structure, from above grade to below grade, for a previously
approved office, research and development campus (Apple Park Phase 2-Tantau 14).
Administrative Hearing decision final unless appealed.
Staff member Kidd addressed the Hearing Officer. The project is part of Phase II of the
approved Apple Campus. This phase of the construction project is called Tantau 14. The Apple
Campus was originally approved in 2013. This project is being heard by the Administrative
Hearing Officer as the proposed changes to the original development approval are a reduction
in the scale of the project, change the parking from above ground to below ground and the
addition of a green roof. The Hearing Officer asked for clarification of how the proposed
changes to the originally approved development application are still in conformity. Staff
member Kidd explained that the development agreement master plan covers Phase I of the
new campus included the main campus building, the garage and associated amenity
buildings. The Phase II portion of the original development agreement includes all the
buildings on Tantau, the visitor center, R & D building and the office building, which is the
subject of the hearing today. The development agreement specified square footage, parking
spaces, height limits, the amount of staffing and the landscaping plans. As the development
has evolved over the years, necessary minor adjustments have come up. She stated that the
proposed project is still in conformity in that the changes are at or are less than the original
4 Administrative Hearing
August 9, 2018
allowances. She referred to a chart in her staff report. The office space is a little less, the
amenity space is a little more, and the allocated number of parking spaces is the same, just
being broken up into above and below ground locations.
The Hearing Officer opened the public comment period.
Kitty Moore, a neighbor of the project - asked what the new Apple Park building, employee
and parking totals are. She also wanted all of the EIR addendums added to the Apple
webpage.
Milt Kosner, a neighbor of the project - spoke in favor of the underground parking and
retaining the concrete walls by his house. He wanted to make sure that the new tree species
being planted wouldn't interfere with power lines. He wanted to know when the estimated
end date of construction is. He wanted to know that Apple is constructing the building to the
highest earthquake standards and when Apple was going to be repairing the damage from the
construction vibrations to the homes near the visitor center was going to be done.
Pat Robbins, a neighbor of the project - listed several concerns regarding the Apple campus
operations: late hours, street sweeping, residential sound wall, smoking in the right of way.
Specific to the project, he wants to see better parking management. Employees and contractors
are parking in the neighborhoods around the visitor center.
Michael Stout, a neighbor of the project - was concerned about the deep excavation that would
be necessary for underground parking. There is current damage being done to homes in the
area from construction vibrations now. This will only continue with this proposal.
Underground parking is preferred, but the construction is a concern. He also expressed the
need for earthquake preparedness for an underground garage.
Rob Wagner, a neighbor of the project - emailed his comments earlier and brought a copy of it
with him to give to staff.
Jennifer Griffin, a neighbor of the project - wanted to know if this building construction was
the last of the construction. She also wanted to know how the dirt was going to be removed
from the site and how traffic around the site was going to be managed.
The Hearing Officer reviewed all of the concerns the speakers for the applicant. Most of the
concerns are related to the Apple Campus construction project as a whole rather than Tantau
14 specifically. He asked the applicant to address these questions.
The applicant, Bernard Baker, Apple Real Estate Development, addressed the Hearing Officer
and the speakers. He said the current completion date is the summer of 2020. The dirt removal
will be hauled according to the traffic management plan needed as one of the conditions of
approval for the project. They have a different street sweeping company than they have used
in the past. He hopes that they are more effective. This project should have less lane closure
occurrences than the larger project did. The neighbor fence along the side of the property
between Apple and the 27 residences was a project his predecessor had worked on. He said
that there had not been consensus with the neighbors regarding the new fence, so the project
to build a new fence has not moved forward. He recently spoke to the landscape architect,
Chris Grimmer. Cedar trees have been proposed as they will provide a nice visual screen.
They will be planting approximately 80 new trees and will confirm their growth rate and will
5 Administrative Hearing
August 9, 2018
be maintaining them. He wasn't sure about the current parking space count, but was confident
that Apple, Inc. would be maintaining/retaining the originally approved space count allotted
for employees. The number of construction workers for this phase of the project is significantly
less and they should be using designated parking. Any complaints about contractors parking
will be forwarded to the Construction Manager. The buildings are constructed to Building
Code, including earthquake ready requirements. Not being a structural engineer, he could not
attest to anything else. Apple prides itself on high quality work and the buildings are being
built to code or above. All of the buildings have low -glare paint treatments, the lights have
been adjusted to reduce or eliminate night time light pollution and the rooftop mechanical
equipment is all being screened. Apple is installing glass film on the windows for additional
privacy for its employees and screening for the neighbors. There is a creekside easement that
the Water District controls, but a cooperative agreement is in place regarding the trees in that
area. The Hearing Officer asked staff about the building permitting process. She stated that the
Building Official meets on a weekly basis with the Apple construction team to discuss required
permits and code standards. This weekly dialog goes over construction standards,
complaints/concerns and enforcement. This team has been working together for years and
works well together. Conversations have occurred between Apple and individual
homeowners regarding property damage. Those conversations will continue.
The Hearing Officer closed the comment period.
The Hearing Officer thanked everyone for coming and for participating in the meeting. The
Hearing Officer thanked the Apple representative for attending the meeting and being
available to answer questions. The Hearing Officer supports the project and concurs that the
proposed modifications fall within the original approval of the development agreement.
DECISION: The application was approved by the Hearing Officer per the draft resolutions.
ADJOURNMENT
Respectfully submitted:
/s/Beth Ebben
Beth Ebben
Deputy Board Clerk
CUPERTINO
Subject
OFFICE OF COMMUNITY DEVELOPMENT
CITY HALL
10300 TORRE A V EN U E • CU PERTI N O, CA 95014-3255
(408) 777-3308 • FAX (408) 777-3333 • planningaupertino.orq
ADMINISTRATIVE HEARING STAFF REPORT
Agenda Date: September 27, 2018
Architectural and Ste Approval to consider allowing a 1,161 square foot first floor and
326 square feet second floor addition to an existing duplex; (Application No.: ASA -2017-
06; Applicant: Susan Chen; Location 22861 Medina Lane; APN(s): 342-30-013)
Recommended Action
That the Hearing Officer adopt thedraft resolution to:
1. Approve the Architectural and S1teApproval application (Attachment 1.)
Discussion
Project Data:
General Plan Planning Area
Inspiration Heights Neighborhood
General Plan Designation
Low Density / Medium Density (5-10 DU/Ac.)
Zoning Designation
R2-4.25
Existing
Proposed
Density:
8 DU/acre
8 DU/acre (no change)
Net Lot Area
10,937 square feet (0.25 acres)
Site Development
Allowed/Required
Existing
Proposed
2'804 sf
°
Lot Coverage (max 40%)
4,375 sf
3,862 sf 35.3%
( )
(25.6%)
1st Floor Setbacks
Front
20'
15'10"
No Change
Rear (greater of 20' or 20% of
20'
22'10"
18'6"
the lot depth)
Required useable rear yard if
proposed rear setback < 20
113'4" x 20' = 2,266
feet but no less than 10 feet
sq ft
-
2,455 sq. ft.
(greater of 850 sq. ft. or 20 times
lot width)
ASA -2017-06 22861 Medina Lane September 27, 2018
Page 2 of 6
Site Development
Allowed/Required
Existing
Proposed
Side: (20% of lot width measured
at front setback line and no side
less than sixfeet)
23' combined and
no side less than six
feet
Left: 22'1"
No change
Right: 11'1"
Right: 8'0"
2nd Floor Setbacks
Front
20'
19,101,
No change
Rear: (20% of lot depth)
20'
45'4"
24'11 "
Side: (At least three feet more
than first floor setback)
Left: 22'11 " +3'= 25'11 "
Left: 58'11
No change
Right: 8'+3' =11'
Right: 11'1"
Right: 20'11"
Total Building Height
28'
23'4"
No change
Consistency
General Plan
Yes
Zoning
Yes
Background:
Site Description
The applicant, Susan Chen, representing the property owner, Haisong Gu, is proposing
a first and second floor addition to an existing duplex (see plan set —Attachment 2).
The 10,937 square foot
flag -lot is located at the r
intersection of Medina >
Lane and EI Prado Way.
Theneighboring usesare
residential and open
space. To the north of the
property is development *•
consisting of attached
townhomes. To the east
and south of the
property along Medina `
Lane and EI Pardo Way
are other duplexes. r
Directly west of the i
property is a private
open space parcel d
associated with a residential planned development.
ASA -2017-06 22861 Medina Lane September 27, 2018
Page 3 of 6
Currently, the existing two -unit duplex has an a total area of 3,544 square feet with one
unit measuring 1,625squarefeet and asecond unit measuring 922squarefeet. Theduplex
includes an 871 square foot garage and 136 square feet of storage area.
Analysis:
Conformance with General Plan and Zoning
The proposed project is consistent with the General Plan Land Use Designation of
Low/Medium Density (5-10 unitstacre) which allows a maximum of two (2) dwelling
units based on the net lot area, and zoning designation of Residential Duplex (R-2) zone.
Architectural and Site Approval
The project will add 1,487 square feet on both floors of an existing two-story duplex. The
floor area of the smal ler unit w i I I increase from 922 square feet to 2,409 square feet, with
1,161 square feet added to the first floor and 326 square feet added as second floor loft.
The lot coverage on site wiII increase from 25.6% to 35.3% and the floor area wiII increase
from 32.5% to 44.8%. Access to this unit will continue to be provided via an existing
exterior staircase located on theeastern elevation.
In addition, the applicant proposes a new entry feature between the duplexes. No
changes are proposed to the parking on site. Duplex properties are required to provide
three (3) parking spaces per dwelling unit (1.5 open and 1.5 enclosed.) In this instance,
the project continues to meet this requirement by provided three (3) parking spaces
within theexisting garage, and three (3) exterior parking spacesfor atotal of six (6).
The arch itectu re and material of theproposed addition aredesigned to match theexisting
home. Thishasbeen accomplished by maintaining asimilar building form, roof lines, and
window treatments. Additionally, exterior finishesof theaddition will beconsistent with
regard to stucco, roofing material, and windows. Theaddition will not change the overall
height of the existing two-story duplex.
The applicant also proposesto make certain site improvements such asthe addition of a
new hot tub on the northwest corner of the property and a new paver walkway located
adjacent to the rear of the buildings.
Geologic Hazard Zone
The property is located with a Fault Rupture Zone. Consistent with the City's
requirements, a Geotechnical Report was submitted to the City for review. The report
was peer reviewed by the City's Geotechnical Consultant who made recommendations
ASA -2017-06 22861 Medina Lane September 27, 2018
Page 4 of 6
to ensure geotechnical safety for the proposed project. These have been incorporated as
conditions of approval.
Other Department/Agency Review
The City's Public Works Department and Building Division have reviewed the project
and have no objections. Their conditions have been incorporated as conditions of
approval in the draft resolution.
Public Noticing and Outreach
The following table i s a brief summary of the noticing done for this project:
Notice of Public Meeting, Site Signage, & Legal
Ad
Agenda
■ One site sign posted on the site (at least 10 days
■ Posted on the City's official
prior to hearing)
notice bulletin board (one
■ Legal ad p I aced in the newspaper (at least 10
week prior to hearing)
days prior to hearing)
■ Posted on the City of
■ 11 notices mailed to adjacent property owners
Cupertino's Web site (one
(10 days prior to hearing)
week prior to hearing)
As of the production of this report, staff has received comments from two neighboring
residents — one written (see Attachment 3) and one verbal. Their concerns and Staff
responses are summarized below:
■ Construction activities (specifically noise) will be an impact to the neighboring residents.
Cupertino Municipal Code(CMC) Chapter 10.48 Community Noise Control limitsthe
hours of construction activities. CMC Section 10.48.053 restricts the amount of noise
that may be generated by construction. Any violation of the City's ordinance would
be considered a code violation and subject to enforcement by the City's Code
Enforcement Division.
■ HVAC System may create unwanted noise. CMC Chapter 10.48: Community Noise
Control limits the amount of noise that is allowed to be generated. For residential
areas, the maximum noise level at the complaint site is 50 dBA in the nighttime and
60 dBA in the daytime. Any HVAC system installed is required to meet these
requirement. Failure to be consistent with the City's ordinance would be considered
a code violation and subject to enforcement by the City's Code Enforcement Division.
■ The project will create privacy impacts. The project proposes the addition of 326 square
feet to an existing second story with windows with sills at four (4) feet above the
ground floor. The City's Municipal Code does not require properties zoned
ASA -2017-06 22861 Medina Lane September 27, 2018
Page 5 of 6
Residential Duplex (R-2) to implement privacy mitigation measures; therefore, no
privacy mitigation measures have been required forthisproject. However, views into
adjacent properties are currently obscured by existing cypress trees on the project site,
and existing treeson theadjacent properties. It should benoted that there are existing
two-story townhomes (with rear windows overlooking the subject property) along
the northern property line whose views are similarly obscured by theexisting trees.
■ Concerns over a change of the fence. The appl icant has not proposed any changes to the
existing fence. Any changeto thefencewill require additional Planning review.
■ Concerns over impacts on views of open space. The City's Municipal Code does not require
projectson Residential Duplex Zoned (R-2) propertiesto prevent impactstoviewsfor
adjacent properties.
Permit Streamlining Act:
This matter is adjudicatory and is subject to the Permit Streamlining Act (Government
Code Section 65920 — 65964). The City has complied with the deadlines found in the
Permit Streamlining Act.
Deemed Incomplete: January 16, 2017, May 30, 2017, October 2, 2017, January 16, 2017
March 28, 2018, and July 16, 2018
Deemed Complete: August 16, 2018
The City had 60 days, until, October 15, 2018 to make a decision on the project.
Environmental Review
This project is categorically exempt from the requirements of the California
Environmental Quality Act (CEQA) per Section 15301(e)—Existing Facilities because the
exemption appliestothe addition of up to 10,000sq.ft. in an areawhereall publicservices
and faci I ities are avai lableto allow for maximum development permissible in the General
Plan and the project isnot located in an environmentally sensitive area.
Conclusion:
Staff recommends approval of the Architectural and Site Approval because the project is
consistent with the General Plan and zoning ordinance, in accordancewith Chapter 19.32.
Next Steps:
The Hearing Officer's decision on thisproject isfinal unlessappealed within 14calendar
days of the decision.
ASA -2017-06 22861 Medina Lane September 27, 2018
Page 6 of 6
Prepared by- Erick Serrano, Associate Planner
Reviewed and Approved by: Piu Ghosh, Principal Planner
Attachments
1 — Draft Resolution for ASA -2017-06
2 - Plan Set
3—Public Comment
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
Draft Resolution
OFTHEADMINISTRATIVE HEARING MEETING OFTHE CITY OF
CUPERTINO APPROVING AN ARCHITECTURAL AND SITEAPPROVAL
APPLICTION FOR 1,487 SQUARE FOOT ADDITION TO AN EXISTING DUPLEX
SECTION I: PROJECT DESCRIPTION
Application No.: ASA -2017-06
Applicant: Susan Chen (SC Design Group)
Location: 22861 Medina Lane APN: 342-30-013
SECTION I I : FINDINGS
WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an
application to allow an Architectural and Site approval of a 1,487 square foot addition
to an existing single- story duplex located on property zoned R-3;
WH EREAS, the necessary public notices have been given as required by the Procedural
Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at
least one public meeting in regard to the application; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, the Administrative Hearing Officer finds:
1. The proposal, at the proposed location, will not be detrimental or injurious to
property or improvements in the vicinity, and will not be detrimental to the public
health, safety, general welfare, or convenience;
The applicant is proposing an addition of 1,487 square feet to an existing duplex. The
addition is designed to visually match the current structure and will be consistent to the
form and land use of surrounding properties. This has been accomplished by maintaining a
similar building form, roof lines, and window treatments. Additionally, exterior finishes of
the addition will be consistent with regard to stucco, roofing material, and windows.
Therefore, the project is not detrimental to the public health, safety, general welfare or
convenience.
Draft Resolution ASA -2017-06 September 27, 2018
Page 2
2. The proposal is consistent with the purposes of Chapter 19.168, Architectural and
Site Review, of the Cupertino Municipal Code, the General Plan, any specific plan,
zoning ordinances, applicable planned development permit, conditional use
permits, variances, subdivision mapsor other entitlementsto usewhich regulatethe
subject property including, but not limited to, adherence to the following specific
criteria:
a) Abrupt changes in building scale should be avoided. A gradual transition related to
height and bulk should be achieved between new and existing buildings;
The addition will avoid any abrupt changes to the scale of the structures on-site and on
adjacent properties by decreasing the height of the proposed second floor addition from 234"
to 207'and by having the majority of the 1,487 square foot addition occur on the first floor,
1,161 square foot of the addition occurs on the first floor.
b) In order to preserve design harmony between new and existing buildings and in
order to preserve and enhance property values, the materials, textures and colors of
new buildings should harmonize with adjacent development by being consistent or
compatible with design and color schemes, and, with the future character of the
neighborhood and purposes of the zone in which they are situated. The location,
height and materials of walls, fencing, hedges and screen planting should harmonize
with adjacent development. Unsightly storage areas, utility installations and
unsightly elements of parking lots should be concealed. The planting of ground
cover or various types of pavements should be used to prevent dust and erosion, and
the unnecessary destruction of existing healthy trees should be avoided. Lighting for
development should be adequate to meet safety requirements as specified by the
engineering and building departments, and provide shielding to prevent spill-over
light to adjoining property owners; and
The proposed architectural design, materials, finishes, and textures will match the existing
building and are compatible with the character of the neighborhood. The project proposes no
changes to the location, height, and materials of walls, fencing, and landscaping. Exterior
lighting other than that typically used in residential development is not being proposed and
no spill-over light uncommon in residential neighborhoods will occur. Furthermore, the
proposal has been designed to meet the R-2 Multi -Family Residential Ordinance and does not
propose to locate unsightly storage, utility units, and/or parking lots visible to the public
right-of-way.
c) The number, location, color, size, height, lighting and landscaping of outdoor
advertising signs and structures shall minimize traffic hazards and shall positively
Draft Resolution ASA -2017-06 September 27, 2018
Page 3
affect the general appearance of the neighborhood and harmonize with adjacent
development; and
No signage or outdoor advertising is requested through this proposal.
d) With respect to new projects within existing residential neighborhoods, new
development should be designed to protect residents from noise, traffic, light and
visually intrusive effects by use of buffering, setbacks, landscaping, walls and other
appropriate design measures
The proposed addition is located in an existing duplex located on a flag lot, which makes the
development difficult to see from the public right-of-way. The project has been designed in
accordance with the development standards of the R-2 Zoning District with the intent to
protect residents from unnecessary noise, traffic, light and visually intrusive effects.
NOW, TH EREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence
submitted in this matter, subject to the conditions which are enumerated in this
Resolution beginning on Page 3 thereof, the application for an Architectural and Site
Approval, Application no. ASA -2017-06, is hereby approved; and
That the sub conclusions upon which the findings and conditions specified in this
Resolution are based and contained in the public meeting record concerning
Application No. ASA -2017-06 asset forth in the Minutes of the Administrative Hearing
Meeting of September 27, 2018, and are incorporated by reference herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the plan set prepared by SC Design Group consisting of nine
(9) sheets labeled "Gu & Ming Residence", except those as may be amended by
conditions in this resolution.
2. ANNOTATION OF THE CONDITION SOF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the
building plans.
3. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks,
property size, building square footage, any relevant easements and/or construction
Draft Resolution
Page 4
ASA -2017-06 September 27, 2018
records. Any misrepresentation of any property data may invalidate this approval
and may require additional review.
4. FEN CES
Any changes to the fencing shall require design review with the Community
Development Department and shall comply with Cupertino Municipal Code
Chapter 19.48 Fences
5. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible for consulting with other departments and/or agencies
with regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
3. EXTERIOR BUILDING MATERIALSITREATMENTS
Final building exterior treatment plan (including but not limited to details on
exterior color, material, architectural treatments, lighting fixtures, and/or
embellishments) shall be reviewed and approved by the Director of Community
Development prior to issuance of building permits. Thefinal building exterior plan
shall closely resemble the details shown on the original approved plans. Any
exterior changes determined to be substantial by the Director of Community
Development shall require a modification approval with neighborhood input. Prior
to issuance of building permits, staff will review exterior material such as doors and
windows to ensure quality and consistency.
4. GEOTECHNICAL PLAN REVIEW
The applicant's geotechnical consultant should review and approve all geotechnical
aspects of the development plans (i.e., site preparation and grading, site drainage
improvements and design parameters for foundations, drainage, pavement and
retaining walls) to ensure that their recommendation have been properly
incorporated. The following should be performed prior to final (as -built) project
approval:
The Geotechnical Plan Review should be submitted to the City for review and
approval by the City staff prior to issuanceof building permits.
5. GEOTECHNICAL FIELD INSPECTION
The geotechnical consultant should inspect, test (as needed), and approve all
geotechnical aspects of the project construction. The inspection should include, but
not limited: site preparation and grading, site surface and subsurface drainage
Draft Resolution
Page 5
ASA -2017-06 September 27, 2018
improvements and excavation for foundation and retaining walls prior to the
placement of steel and concrete. The following should be specifically performed:
The Project Geotechnical Consultant should closely monitor the fill and expansive
soil over -excavation, and pool backfill to assure that rigid grid foundation is placed
on low -expansion potential materials, and atop suitably compacted fill materials.
6. BUILDING AND FIRE CODE
The applicant shall apply for and obtain building permits to allow the construction of the
approved project. The applicant shall provide information and plans to allow the Building
Official and the Fire Marshall or their designee that the proposed plans comply with
Building and Fire Codes in effect at thetimeof application for a building permit.
7. INDEMNIFICATION
Except as otherwise prohibited by law, the applicant shall indemnify and hold
harmless the City, its City Council, and its officers, employees and agents
(collectively, the "indemnified parties') from and against any claim, action, or
proceeding brought by a third party against one or more of the indemnified parties
or one or more of the indemnified parties and the applicant to attack, set aside, or
void this Resolution or any permit or approval authorized hereby for the project,
including (without limitation) reimbursing the City its actual attorneys' fees and
costs incurred in defense of the litigation. The applicant shall pay such attorneys'
fees and costswithin 30daysfollowing receipt of invoicesfrom City. Such attorneys'
fees and costs shall include amounts paid to counsel not otherwise employed as City
staff and shall include City Attorney time and overhead costs and other City staff
overhead costs and any costs directly related to the litigation reasonably incurred by
City.
8. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTH ER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant to
Government Code Section 66020(d) (1), these Conditions constitute written notice of
a statement of the amount of such fees, and a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90 -day
approval period in which you may protest these fees, dedications, reservations, and
other exactions, pursuant to Government Code Section 66020(a), has begun. If you
fail to file a protest within this 90 -day period complying with all of the requirements
of Section 66020, you will be legally barred from later challenging such exactions.
Draft Resolution ASA -2017-06 September 27, 2018
Page 6
PASSED AND ADOPTED this 27'" day of September, 2018 at a noticed Public Meeting
of the Administrative Hearing Officer of the City of Cupertino, State of California, held
by the Director of Community Development, or his or her designee, pursuant to
Cupertino Municipal Code Section 19.12.120.
ATTEST:
Erick Serrano
Associate Planner
APPROVED:
Benjamin Fu
Asst. Director of Community Development
S'or ,,
D9� e. O
�xF CIO
U TT�
I'I W
zF_
C7
a C
fir w00d [)r
GENERAL INFORMATION
OWNER: ARRY GU & WEI MING ----�--'
EMAIL: CIHARRY@GMAIL.COM = i 1<E>EM
PHONE: 775 -24❑ -9793 = o
1
PROPERTY 22861 MEDINA LN,
ADDRESS: UPERTINO,CA 95014
APN: PN:342-30-01 3
DESCRIPTION OF N>1 ST FLOOR ADDITION: o
WORK: N>MASTER BDRM, BTHRM, WIC, HALF
THRM, FAMILY ROOM, ENTERTAINMENT <E>
� ' 1
❑❑M 1'161 SQ.FT. LANDSCAPING 1
N>2ND FLOOR ADDITION: I 1 1
❑ FT 3 2 6 S Q. FT. .a yi I i 1
N>P❑RCH 33 SQ.FT. iy i 16 --
LAND USE: OW/MEDIUM DENSITY (5-1 ❑ DU/AR.)
ZONING: 2-4.25 5' PUBLIC
OCCUPANCY3/U UTILITY I WI
GROUP: EASEMENT •' ' •1
I�
TYPE OF - W W 9'„I i 14'-7° • WI
CONSTRUCTION: /B, FULLY SPRINKLED
STORIES: TWO STORIES
NET LOT AREA: 1 0,937 SQ.FT.
GROSS LOT AREA: 1 2,202 SQ.FT. W l
1 ST FLOOR z
FLOOR CALCULATION 6 PROPERTY _0> .'.Q
SETBACK LINE
m
LJ,
REFER TO Al .1 FOR BLOCK DIAGRAM:
5' WIRE --
EXISTING 1ST FLOOR: CLEARANCE w �i. •`OI 1 WI
(E) UNIT 1 1,625 SQ.FT. p
EASEMENT O "o I 1
(E) GARAGE 871 SQ.FT. O i LL_
(E) UTILITY ROOM 85 SQ.FT.
(E) COVERED PORCH 96 SQ.FT. I- .C31
TOTAL EXISTING 1 ST FLOOR 2,690 SQ.FT. (D CV I ASTAIRS <NOT COUNT> 62 SQ.FT. _ <E>6E�TAIN A
WA
EXISTING 2ND FLOOR: 922 SQ.FT. W NO1JA-N
(E) UNIT 2
31 HEIG 1
TOTAL EXISTING BUILDING ON SITE -
1 � 1
TOTAL: 3,554 SQ.FT.
<E>FR I T T E 1
.L
PROPOSED 1 ST FLOOR ADDITION AREA 4"TBD 1 \
ENTERTAINMENT ROOM, FAMILY ROOM 1"
M. BDRM, M. BTHRM, HALF BTHRM, WIC 1,161 SQ. FT. - - 123 -6
FRONT COVERED PORCH 33 SQ. FT. <E>FR IW WRW W 'W
PROPOSED 2ND FLOOR ADDITION AREA 4"TBD ..
LOFT 326 SQ. FT. 1
I
I
<N> TOTAL LIVING AREA ON SITE ADDED 1,520 SQ.FT. .y.
�WWW. i< PL <
IP . 1» T -
<E> TOTAL FLOOR AREA 3,554 SQ.FT. i x ,
<N> TOTAL FLOOR AREA 5,074 SQ.FT. +
EXISTING LOT COVERAGE 25.6%
2,690+62+51 =2,803 SQ.FT. ■ <E>L/
PROPOSED LOT COVERAGE 35.3% (REFER TO SHEET A-1.2) ■ 6 HE/
3,862 SQ.FT. N(B 0� GNT WD(
MAX LOT COVERAGE 40% 2 12
4,374.8 SQ.FT.ci
PROPOSED FAR: ■
4,905 / 1 0937 = 44.8% ■
6 =
0
PROPERTY SETBACKS
■
SETBACK: EXISTING: REQUIRED: PROPOSED: ■ o
FRONT 15'-10° 20'-0" NO CHANGE
O LEFT SIDE 221-1" 6'-❑" NO CHANGE
tj _j RIGHT SIDE 1 1 ' 1" ' 6 0" ' 8 0"
LL REAR 22'-10" 10'-0" 18'-6"
■
FRONT 171-1" 20'-0" NO CHANGE ■
O LEFT SIDE 58'-1 1" 9'-0" NO CHANGE
❑Z _j RIGHT SIDE 111 1" 9' 0" 20'-1 1"
N LL REAR 451-4" 20'-0" 24'-1" _
0
■
■
CODE & REGULATION o
ALL WORK TO COMPLY WITH THE 2016 C.B.C.,
C.M.C., C.P.C. & 201 6 C.E.C., CALIFORNIA TITLE
24 AMENDMENTS, AND CITY OF CUPERTINO ■
■ o
BUILDING CODE USED PERFORM THE WORK ACCORDING
TO THE BUILDING CODES, ORDINANCES AND LAWS OF
THE AUTHORITY HAVING JURISDICTION OF THE
PROJECT WHICH INCLUDE BUT ARE NOT LIMITED TO:
■
A. 2❑ 1 6 CALIFORNIA BUILDING CODE ■
B. 2D 1 6 CALIFORNIA RESIDENTIAL CODE
C. 2016 CALIFORNIA MECHANICAL CODE
D. 2❑ 1 6 CALIFORNIA PLUMBING CODE c
E. 2016 CALIFORNIA ELECTRICAL CODE
F. 2❑ 1 6 CALIFORNIA FIRE CODE ■
G. 2016 CALIFORNIA GREEN BUILDING STANDARD CODE ■
F. CITY OF CUPERTINO MUNICIPAL CODE SITE COTES:
ALL DIMENSIONS AND SETBACK POINTS
NEED TO BE CHECKED BEFORE THE
ARCHITECTURAL ADDI ION TAKES PLACE. PLEASE VERIFY
■ ALL S TBACKS FROM THE BOUNDARY OF
■ THE PtR❑PERTY TO THE <E> HOUSE AND
A-1 .❑ COVER SHEET/ SITE PLAN <N> ADDITIONS PRIER TO DIGGING NEW
A-1 .1 DEMO PLANS F❑UN ATION AND POURING OF THE
A-1 .2 BLOCK DIAGRAMS C❑NC ETE OR FORM WORK SETUP.
A-2.0 PROPOSED FLOOR PLANS IF THE SETBACK AT THE SITE ODES N❑T
A-3.0 EXISTING AND PROPOSED FRONT ELEVATIONS MATCHcUP TO THE DRAWING OR IS OVER
A-3.1 EXISTING AND PROPOSED REAR ELEVATIONS ■ THE APL❑WABLE SETBACK PLEASE
A-3.2 EXISTING AND PROPOSED LEFT ELEVATIONS
CONTACT THE PROJECT ARCHITECT FOR
A-3.3 EXISTING AND PROPOSED RIGHT ELEVATIONS
■
A-3.4 PROPOSED CROSS SECTIONS FURTHIfR GUIDANCE ON THE PROJECT.
PROJECT DATA i
•
GENERAL NOTES
• 1 WORKING HOURS: No WORK SHALL COMMENCE ON THE JOB SITE PRIOR To 7:❑❑ A.M. NOR 6. IN CASE OF ANY DISCREPANCY IN THE CONTRACT DOCUMENTS, CONSULT THE ARCHITECT G U & MING
CONTINUE LATER THAN 6:00 P.M., MONDAY THROUGH FRIDAY, NOR SHALL ANY WORK BE BEFORE PROCEEDING. RESIDENCE
PERMITTED ON SATURDY OF SUNDAY UNLESS PRIOR APPROVAL IS GRANTED BY THE BUILDING 7. No DIMENSIONS SHALL BE TAKEN BY SCALING FROM THE DRAWINGS. DETAILS TAKE
OFFICAL. PRECEDENCE OVER GENERAL SECTIONS OR FLOOR PLANS. IF DIMENSIONS MUST BE
2. GENERAL CONTRACTOR SHALL VERIFY ALL UNDERGROUND UTILITY LOCATIONS PRIOR TO CLARIFIED, CONSULT THE ARCHITECT. REFER TO THE COVER SHEET FOR DIMENSIONING
EXCAVATION, TRENCHING, OR GRADING OF ANY KIND. GENERAL CONTRACTOR SHALL COORDINATE STANDARDS.
WITH APPLICABLE UTILITY COMPANIES WHEN REROUTING ELECTRICAL, TELEPHONE, CABLE TV, GAS, B. VERIFY ALL DIMENSIONS ON THE JOB SITE PRIOR TO ORDERING OR MANUFACTURING. 22861 MEDINA LN
WATER, SANITARY SEWER SERVICES, OR ANY OTHER UTILITY. G. C. SHALL MAINTAIN ALL 9. GENERAL CONTRACTOR SHALL REVIEW ALL ARCHITECTURAL DRAWINGS BEFORE FRAMING. CUPERTIN❑,CA 95❑ 1 4
ELECTRICAL AND COMMUNICATION SYSTEMS IN HOUSE AT ALL TIMES. COORDINATE RECESSED LIGHT FIXTURE LOCATIONS, SHAFTS, AND HVAC DUCTWORK PRIOR
3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL GOVERNING CODES, ORDINANCES, TO FRAMING. IT IS IMPERATIVE THAT FRAMING MEMBER LOCATIONS D❑ NOT CONFLICT WITH
AND REGULATIONS, G. C. SHALL BECOME FAMILIAR WITH ALL CITY OF ASPECTS ❑F WORKING. LOCATIONS OF RECESSED LIGHT FIXTURES. IF CONFLICT EXISTS, NOTIFY ARCHITECT.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION AND EXECUTION OF THE 10. GENERAL CONTRACTOR SHALL INSTALL ALL APPLIANCES SPECIFIED AND ALL NEW
WORK SHOWN OR IMPLIED IN THE CONSTRUCTION DOCUMENTS AND IS RESPONSIBLE FOR EQUIPMENT ACCORDING TO MANUFACTURER'S INSTRUCTIONS. ALL GUARANTEES,
CONSTRUCTION MEANS, METHODS, AND PROCEDURES. INSTRUCTION BOOKLETS, AND INFORMATION REGARDING NEW EQUIPMENT SHALL BE
4. GENERAL CONTRACTOR SHALL COORDINATE ALL FACETS OF HIS WORK AND ALL TRADES INVOLVED HANDED DIRECTLY TO THE OWNER IN ONE MANILA ENVELOPE AT THE TIME OF SUBSTANTIAL
TO AVOID CONFLICT IN THE LOCATION, INSTALLATION, AND CONSTRUCTION OF ALL ITEMS OF COMPLETION. CONTRACTOR SHALL VERIFY THAT EVERY PIECE OF EQUIPMENT AND EVERY
WORK AS INDICATED ON THE CONSTRUCTION DOCUMENTS. IF ANY WORK IS TO BE INSTALLED BY APPLIANCE IS IN PERFECT WORKING ORDER AND THAT INFORMATION ABOUT ALL
>SYPRESS THE OWNER DIRECTLY, ALLOWANCES FOR THE OWNERS WORK MUST BE MADE. COORDINATE WITH WARRANTIES AND GUARANTEES IS MADE KNOWN TO THE OWNER.
10"TBD ARCHITECT / OWNER. 1 1. THE INSTALLER OF EACH MAJOR UNIT OF WORK IS REQUIRED TO INSPECT THE SUBSTRATE
5. GENERAL CONTRACTOR SHALL LEAVE THE JOB SITE "BROOM CLEAN" AT THE END OF EACH AND CONDITIONS TO RECEIVE WORK AND SHALL REPORT ALL UNSATISFACTORY CONDITIONS
WORKING DAY. ALL MATERIALS SHALL BE STORED IN A NEAT AND SAFE PLACE TO AVOID TO THE GENERAL CONTRACTOR AND NOT PROCEED UNTIL SATISFACTORY CONDITIONS ARE 20370 TOWN CENTER LN
<E>SYPRESS ACCIDENTS, FOR CONSTRUCTION AND FOR THE OWNER. ATTAINED. SUITE 1 39
12. FOR MOUNTING HEIGHTS N❑T CLEARLY OUTLINED IN THE PLANS OR SCHEDULES, CUPERTINO, CA 9501 4
IN 10" COORDINATE WITH THE ARCHITECT. ARCHITECT SHALL CONFIRM ALL ELECTRICAL DEVICE 40B.B65.0577
pN AND LIGHT FIXTURE LOCATIONS BEFORE CONTRACTOR PULLS WIRE.
ON \ 13. PROVIDE SOLID BLOCKING AS NECESSARY FOR WALL MOUNTED SHELVES, FIXTURES, AND
FITTINGS, EVEN WHEN WORK IS TO BE DONE BY OWNER DIRECTLY. REVIEW SCOPE OF WORK
7_01� AND LOCATIONS FROM INTERIOR ELEVATIONS AND COORDINATE WITH OWNER/ARCHITECT.
• •
14. ALL FASTENING DEVICES TO BE CONCEALED, UNLESS OTHERWISE SHOWN.
15. WEATHER-STRIP ALL EXTERIOR DOORS AND WINDOWS.
\ \ Q • •
16. CAULK OR OTHERWISE SEAL AROUND ALL OPENINGS TO LIMIT INFILTRATION, INCLUDING BUT
\\ �� ` • NOT LIMITED TO: EXTERIOR JOINTS AROUND WINDOWS AND DOOR FRAMES, BETWEEN SOLE
\�� /�.� • ` PLATES AND FLOORS AND BETWEEN EXTERIOR WALL PANELS.
•
17. GENERAL CONTRACTOR SHALL VERIFY THAT ALL WORK ON THE EXTERIOR OF THE PROJECT
•IS WATERTIGHT. ALL JOINTS EXPOSED TO THE ELEMENTS SHALL BE TESTED FOR WATER
`
PUBLIC UTILITY • • TIGHTNESS PRIOR TO SUBSTANTIAL COMPLETION.
z k EMENT •
•
left
SCK
w �, `••
�5`� WIRE CLEARANCE
r--C------�
8'-0" ASEMENT • •
z
i� 1 •
1 I O •
/ O •.
----------------
& 2ND FLOOR
r
O
E
q CK
_TI
Q-,,
O
<E>PARK NG
O
0
2 . Medina n
N `�
/
Ln
Ln
2
fTl
D
�
tSedina
Medina
�
W =
0
N
I Oak Ct
O r
(�
(n n
N
■
140-iee
cn
Financial Strve
N v
O
w`
z
�
O, cn
°° D
COs
<E>FRUIT
z
TREE
VICINITY MAP
4" TB D
GENERAL INFORMATION
OWNER: ARRY GU & WEI MING ----�--'
EMAIL: CIHARRY@GMAIL.COM = i 1<E>EM
PHONE: 775 -24❑ -9793 = o
1
PROPERTY 22861 MEDINA LN,
ADDRESS: UPERTINO,CA 95014
APN: PN:342-30-01 3
DESCRIPTION OF N>1 ST FLOOR ADDITION: o
WORK: N>MASTER BDRM, BTHRM, WIC, HALF
THRM, FAMILY ROOM, ENTERTAINMENT <E>
� ' 1
❑❑M 1'161 SQ.FT. LANDSCAPING 1
N>2ND FLOOR ADDITION: I 1 1
❑ FT 3 2 6 S Q. FT. .a yi I i 1
N>P❑RCH 33 SQ.FT. iy i 16 --
LAND USE: OW/MEDIUM DENSITY (5-1 ❑ DU/AR.)
ZONING: 2-4.25 5' PUBLIC
OCCUPANCY3/U UTILITY I WI
GROUP: EASEMENT •' ' •1
I�
TYPE OF - W W 9'„I i 14'-7° • WI
CONSTRUCTION: /B, FULLY SPRINKLED
STORIES: TWO STORIES
NET LOT AREA: 1 0,937 SQ.FT.
GROSS LOT AREA: 1 2,202 SQ.FT. W l
1 ST FLOOR z
FLOOR CALCULATION 6 PROPERTY _0> .'.Q
SETBACK LINE
m
LJ,
REFER TO Al .1 FOR BLOCK DIAGRAM:
5' WIRE --
EXISTING 1ST FLOOR: CLEARANCE w �i. •`OI 1 WI
(E) UNIT 1 1,625 SQ.FT. p
EASEMENT O "o I 1
(E) GARAGE 871 SQ.FT. O i LL_
(E) UTILITY ROOM 85 SQ.FT.
(E) COVERED PORCH 96 SQ.FT. I- .C31
TOTAL EXISTING 1 ST FLOOR 2,690 SQ.FT. (D CV I ASTAIRS <NOT COUNT> 62 SQ.FT. _ <E>6E�TAIN A
WA
EXISTING 2ND FLOOR: 922 SQ.FT. W NO1JA-N
(E) UNIT 2
31 HEIG 1
TOTAL EXISTING BUILDING ON SITE -
1 � 1
TOTAL: 3,554 SQ.FT.
<E>FR I T T E 1
.L
PROPOSED 1 ST FLOOR ADDITION AREA 4"TBD 1 \
ENTERTAINMENT ROOM, FAMILY ROOM 1"
M. BDRM, M. BTHRM, HALF BTHRM, WIC 1,161 SQ. FT. - - 123 -6
FRONT COVERED PORCH 33 SQ. FT. <E>FR IW WRW W 'W
PROPOSED 2ND FLOOR ADDITION AREA 4"TBD ..
LOFT 326 SQ. FT. 1
I
I
<N> TOTAL LIVING AREA ON SITE ADDED 1,520 SQ.FT. .y.
�WWW. i< PL <
IP . 1» T -
<E> TOTAL FLOOR AREA 3,554 SQ.FT. i x ,
<N> TOTAL FLOOR AREA 5,074 SQ.FT. +
EXISTING LOT COVERAGE 25.6%
2,690+62+51 =2,803 SQ.FT. ■ <E>L/
PROPOSED LOT COVERAGE 35.3% (REFER TO SHEET A-1.2) ■ 6 HE/
3,862 SQ.FT. N(B 0� GNT WD(
MAX LOT COVERAGE 40% 2 12
4,374.8 SQ.FT.ci
PROPOSED FAR: ■
4,905 / 1 0937 = 44.8% ■
6 =
0
PROPERTY SETBACKS
■
SETBACK: EXISTING: REQUIRED: PROPOSED: ■ o
FRONT 15'-10° 20'-0" NO CHANGE
O LEFT SIDE 221-1" 6'-❑" NO CHANGE
tj _j RIGHT SIDE 1 1 ' 1" ' 6 0" ' 8 0"
LL REAR 22'-10" 10'-0" 18'-6"
■
FRONT 171-1" 20'-0" NO CHANGE ■
O LEFT SIDE 58'-1 1" 9'-0" NO CHANGE
❑Z _j RIGHT SIDE 111 1" 9' 0" 20'-1 1"
N LL REAR 451-4" 20'-0" 24'-1" _
0
■
■
CODE & REGULATION o
ALL WORK TO COMPLY WITH THE 2016 C.B.C.,
C.M.C., C.P.C. & 201 6 C.E.C., CALIFORNIA TITLE
24 AMENDMENTS, AND CITY OF CUPERTINO ■
■ o
BUILDING CODE USED PERFORM THE WORK ACCORDING
TO THE BUILDING CODES, ORDINANCES AND LAWS OF
THE AUTHORITY HAVING JURISDICTION OF THE
PROJECT WHICH INCLUDE BUT ARE NOT LIMITED TO:
■
A. 2❑ 1 6 CALIFORNIA BUILDING CODE ■
B. 2D 1 6 CALIFORNIA RESIDENTIAL CODE
C. 2016 CALIFORNIA MECHANICAL CODE
D. 2❑ 1 6 CALIFORNIA PLUMBING CODE c
E. 2016 CALIFORNIA ELECTRICAL CODE
F. 2❑ 1 6 CALIFORNIA FIRE CODE ■
G. 2016 CALIFORNIA GREEN BUILDING STANDARD CODE ■
F. CITY OF CUPERTINO MUNICIPAL CODE SITE COTES:
ALL DIMENSIONS AND SETBACK POINTS
NEED TO BE CHECKED BEFORE THE
ARCHITECTURAL ADDI ION TAKES PLACE. PLEASE VERIFY
■ ALL S TBACKS FROM THE BOUNDARY OF
■ THE PtR❑PERTY TO THE <E> HOUSE AND
A-1 .❑ COVER SHEET/ SITE PLAN <N> ADDITIONS PRIER TO DIGGING NEW
A-1 .1 DEMO PLANS F❑UN ATION AND POURING OF THE
A-1 .2 BLOCK DIAGRAMS C❑NC ETE OR FORM WORK SETUP.
A-2.0 PROPOSED FLOOR PLANS IF THE SETBACK AT THE SITE ODES N❑T
A-3.0 EXISTING AND PROPOSED FRONT ELEVATIONS MATCHcUP TO THE DRAWING OR IS OVER
A-3.1 EXISTING AND PROPOSED REAR ELEVATIONS ■ THE APL❑WABLE SETBACK PLEASE
A-3.2 EXISTING AND PROPOSED LEFT ELEVATIONS
CONTACT THE PROJECT ARCHITECT FOR
A-3.3 EXISTING AND PROPOSED RIGHT ELEVATIONS
■
A-3.4 PROPOSED CROSS SECTIONS FURTHIfR GUIDANCE ON THE PROJECT.
PROJECT DATA i
•
GENERAL NOTES
• 1 WORKING HOURS: No WORK SHALL COMMENCE ON THE JOB SITE PRIOR To 7:❑❑ A.M. NOR 6. IN CASE OF ANY DISCREPANCY IN THE CONTRACT DOCUMENTS, CONSULT THE ARCHITECT G U & MING
CONTINUE LATER THAN 6:00 P.M., MONDAY THROUGH FRIDAY, NOR SHALL ANY WORK BE BEFORE PROCEEDING. RESIDENCE
PERMITTED ON SATURDY OF SUNDAY UNLESS PRIOR APPROVAL IS GRANTED BY THE BUILDING 7. No DIMENSIONS SHALL BE TAKEN BY SCALING FROM THE DRAWINGS. DETAILS TAKE
OFFICAL. PRECEDENCE OVER GENERAL SECTIONS OR FLOOR PLANS. IF DIMENSIONS MUST BE
2. GENERAL CONTRACTOR SHALL VERIFY ALL UNDERGROUND UTILITY LOCATIONS PRIOR TO CLARIFIED, CONSULT THE ARCHITECT. REFER TO THE COVER SHEET FOR DIMENSIONING
EXCAVATION, TRENCHING, OR GRADING OF ANY KIND. GENERAL CONTRACTOR SHALL COORDINATE STANDARDS.
WITH APPLICABLE UTILITY COMPANIES WHEN REROUTING ELECTRICAL, TELEPHONE, CABLE TV, GAS, B. VERIFY ALL DIMENSIONS ON THE JOB SITE PRIOR TO ORDERING OR MANUFACTURING. 22861 MEDINA LN
WATER, SANITARY SEWER SERVICES, OR ANY OTHER UTILITY. G. C. SHALL MAINTAIN ALL 9. GENERAL CONTRACTOR SHALL REVIEW ALL ARCHITECTURAL DRAWINGS BEFORE FRAMING. CUPERTIN❑,CA 95❑ 1 4
ELECTRICAL AND COMMUNICATION SYSTEMS IN HOUSE AT ALL TIMES. COORDINATE RECESSED LIGHT FIXTURE LOCATIONS, SHAFTS, AND HVAC DUCTWORK PRIOR
3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL GOVERNING CODES, ORDINANCES, TO FRAMING. IT IS IMPERATIVE THAT FRAMING MEMBER LOCATIONS D❑ NOT CONFLICT WITH
AND REGULATIONS, G. C. SHALL BECOME FAMILIAR WITH ALL CITY OF ASPECTS ❑F WORKING. LOCATIONS OF RECESSED LIGHT FIXTURES. IF CONFLICT EXISTS, NOTIFY ARCHITECT.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION AND EXECUTION OF THE 10. GENERAL CONTRACTOR SHALL INSTALL ALL APPLIANCES SPECIFIED AND ALL NEW
WORK SHOWN OR IMPLIED IN THE CONSTRUCTION DOCUMENTS AND IS RESPONSIBLE FOR EQUIPMENT ACCORDING TO MANUFACTURER'S INSTRUCTIONS. ALL GUARANTEES,
CONSTRUCTION MEANS, METHODS, AND PROCEDURES. INSTRUCTION BOOKLETS, AND INFORMATION REGARDING NEW EQUIPMENT SHALL BE
4. GENERAL CONTRACTOR SHALL COORDINATE ALL FACETS OF HIS WORK AND ALL TRADES INVOLVED HANDED DIRECTLY TO THE OWNER IN ONE MANILA ENVELOPE AT THE TIME OF SUBSTANTIAL
TO AVOID CONFLICT IN THE LOCATION, INSTALLATION, AND CONSTRUCTION OF ALL ITEMS OF COMPLETION. CONTRACTOR SHALL VERIFY THAT EVERY PIECE OF EQUIPMENT AND EVERY
WORK AS INDICATED ON THE CONSTRUCTION DOCUMENTS. IF ANY WORK IS TO BE INSTALLED BY APPLIANCE IS IN PERFECT WORKING ORDER AND THAT INFORMATION ABOUT ALL
>SYPRESS THE OWNER DIRECTLY, ALLOWANCES FOR THE OWNERS WORK MUST BE MADE. COORDINATE WITH WARRANTIES AND GUARANTEES IS MADE KNOWN TO THE OWNER.
10"TBD ARCHITECT / OWNER. 1 1. THE INSTALLER OF EACH MAJOR UNIT OF WORK IS REQUIRED TO INSPECT THE SUBSTRATE
5. GENERAL CONTRACTOR SHALL LEAVE THE JOB SITE "BROOM CLEAN" AT THE END OF EACH AND CONDITIONS TO RECEIVE WORK AND SHALL REPORT ALL UNSATISFACTORY CONDITIONS
WORKING DAY. ALL MATERIALS SHALL BE STORED IN A NEAT AND SAFE PLACE TO AVOID TO THE GENERAL CONTRACTOR AND NOT PROCEED UNTIL SATISFACTORY CONDITIONS ARE 20370 TOWN CENTER LN
<E>SYPRESS ACCIDENTS, FOR CONSTRUCTION AND FOR THE OWNER. ATTAINED. SUITE 1 39
12. FOR MOUNTING HEIGHTS N❑T CLEARLY OUTLINED IN THE PLANS OR SCHEDULES, CUPERTINO, CA 9501 4
IN 10" COORDINATE WITH THE ARCHITECT. ARCHITECT SHALL CONFIRM ALL ELECTRICAL DEVICE 40B.B65.0577
pN AND LIGHT FIXTURE LOCATIONS BEFORE CONTRACTOR PULLS WIRE.
ON \ 13. PROVIDE SOLID BLOCKING AS NECESSARY FOR WALL MOUNTED SHELVES, FIXTURES, AND
FITTINGS, EVEN WHEN WORK IS TO BE DONE BY OWNER DIRECTLY. REVIEW SCOPE OF WORK
7_01� AND LOCATIONS FROM INTERIOR ELEVATIONS AND COORDINATE WITH OWNER/ARCHITECT.
• •
14. ALL FASTENING DEVICES TO BE CONCEALED, UNLESS OTHERWISE SHOWN.
15. WEATHER-STRIP ALL EXTERIOR DOORS AND WINDOWS.
\ \ Q • •
16. CAULK OR OTHERWISE SEAL AROUND ALL OPENINGS TO LIMIT INFILTRATION, INCLUDING BUT
\\ �� ` • NOT LIMITED TO: EXTERIOR JOINTS AROUND WINDOWS AND DOOR FRAMES, BETWEEN SOLE
\�� /�.� • ` PLATES AND FLOORS AND BETWEEN EXTERIOR WALL PANELS.
•
17. GENERAL CONTRACTOR SHALL VERIFY THAT ALL WORK ON THE EXTERIOR OF THE PROJECT
•IS WATERTIGHT. ALL JOINTS EXPOSED TO THE ELEMENTS SHALL BE TESTED FOR WATER
`
PUBLIC UTILITY • • TIGHTNESS PRIOR TO SUBSTANTIAL COMPLETION.
z k EMENT •
•
left
SCK
w �, `••
�5`� WIRE CLEARANCE
r--C------�
8'-0" ASEMENT • •
z
i� 1 •
1 I O •
/ O •.
----------------
& 2ND FLOOR
--
E
q CK
o
<E>PARK NG
0
0
<E>PARKING
N `�
/
�
10'-0"
o
10' 0"
0
N
_"
2ND STORY
20' PROPERTY
SETBACK LINE
<E>FRUIT TREE
TO BE REMOVED
6"TBD
I
O
O
<E>PALM TREE
12"TBD
N
O
N
Q0
z
<E>PALM
10"TBD
20' PROP
SETBACK
<E>PALM TRE
8"TBD
I
1
REVISION
09.07.2016 1ST PRELIMINARY PLANNING
02.2017 2ND PRELIMINARY P NNING R
06.2017 PLANNING REVIEW 1
10.2017 PLANNING REVIEW 2
12.2017 PLANNING REVIEW 3
01.2018 PLANNING REVIEW 4
05.2018 PLANNING REVIEW/5
07.19,18 PLANNING REVIEW
PROJECT NO. 1612 DATE 02.2017
SITE PLAN
A-1.0
<E>EM
II
II
II
II
II
II
II
II
II
II
II
II
II
II
II
II
II
II
II
II
II
II
II
II
II
II
II
II
II
II
II
II
u
\
\
\
\
\
\
\
\
I \
\
\
\
\
\
\
I /
\
I /
<E>SWIMMING POOL TO BE DEMOLISHED /
I
I /
I /
I /
\
\ I\
\
\
\
\
\
\
\
\
\
\
\
\
\ J
/
/
/
/
i
WIND❑W TO BE REMOVED
/
I
TO BE RELOCATED I I
II / II
II II II
DEMO PLAN -EXISTING 1 ST FLOOR PLAN
1-❑
SCALE: 1/4'' = ll' -O"
DEMO WALL
EXST. WALL
2-❑
/
/
/
EE
O °
°
<E>KITCHEN O°
<E>DINING
DEMO PLAN - EXISTING 2ND FLOOR PLAN
SCALE: 1/4" = 1 '-O°
GU & MING
RESIDENCE
22861 MEDINA LN
CUPERTIND,CA 95014
20370 TOWN CENTER LN
SUITE 139
CUPERTINO, CA 9501 4
408.865.0577
REVISION
09.07.2016 1ST PRELIMINARY PLANNING
02.2017 2ND PRELIMINARY PLANNING R
06.2017 PLANNING REVIEW
10.2017 PLANNING REVIEW
12.2017 PLANNING REVIEWAl
01.2018 PLANNING REVIEW
05.2018 PLANNING REVIEW
PROJECT NO. 1612 DATE 02.2017
DEMO PLANS
-"qqftft•• ■
PROPOSED BLOCK
DIAGRAM -1 ST FLOOR • •
3-O ■
SCALE: 1 /B'' = 1 '-O�� ■
♦ I
442.8 SQ FT
16'-3"
58.2 SQ FT
14' /
/
9
237.8 SQ`FT
30 SQ FT
2ND FLOOR
UNIT 2
0
254.4 SQ FT
12'-10"
PROPOSED BLOCK
4-0 DIAGRAM -2ND FLOOR
SCALE: 1/B'' = ll' -O"
NET LOT AREA: 1 0,937 SQ FT
EXISTING FLOOR AREA:
UNIT #1 (1) 1,625 SQ FT
GARAGE (2) 871 SQ FT
DEMO (5) 51 SQ FT
DEMO (6) 85 SQ FT
UNIT #2 (7) 922 SQ FT
TOTAL: 3,554 SQ FT
LOT COVERAGE:
(1)
1,63B
SQ FT
(2)
871 SQ
FT
(3)
96 SQ
FT
(4)
63 SQ
FT
(5)
51 SQ
FT
(6)
85 SQ
FT
TOTAL:
2,804 SQ FT
35.3%
25.6%
UNIT #1: 1,625 SQ FT
UNIT #2: 922 SQ FT
1 ST TO 2ND UNIT RATIO: 1.76
� A -
I
N
224.8 SQ FT
9'-1"
USABLE REAR YARD AREA:
(1 0) 2,455 SQ FT
LOT WIDTH X 20 = 1 1 31-411 X 20 =2,266 SQ FT
THEREFORE, THE REAR YARD SETBACK COULD BE
REDUCED TO 1 0 FEET
ADDITION:
(8) 1, 1 61 SQ FT
(9) 326 SQ FT
(1 1) 33 SQ FT
TOTAL: 1,525 SQ FT
PROPOSED FLOOR AREA:
(1) 1,625 SQ FT
(2) 871 SQ FT
(7) 922 SQ FT
(8) 1, 1 61 SQ FT
(9) 326 SQ FT
TOTAL: 4,905 SQ FT
FAR: 44.8%
R■lls■l■1VI2111:L'trl4
(1)
1,638
SQ FT
(2)
871 SQ FT
(3)
96 SQ
FT
(4)
63 SQ
FT
(8)
1, 1 6 1
SQ FT
(1 1)
33 SQ
FT
TOTAL:
3,862 SQ FT
35.3%
1 ST UNIT: 1,625 SQ FT
2ND UNIT: 922 + 1 , 1 61 +326=2,409 SQ FT
2ND TO 1 ST UNIT RATIO: 1.48
PROPOSED FAR: 4,905/ 10,937 = 44.8% 0
GU & MING
RESIDENCE
22861 MEDINA LN
CUPERTINO,CA 9SD14
20370 TOWN CENTER LN
SUITE 139
CUPERTINO, CA 9501 4
408.865.0577
REVISION
09.07.2016 1ST PRELIMINARY PLANNING
02.2017 2ND PRELIMINARY P NNING R
06.2017 PLANNING REVIEW 1
10.2017 PLANNING REVIEW 2
12.2017 PLANNING REVIEW
01.2018 PLANNING REVIEW
05.2018 PLANNING REVIEW
07.19.2018 PLANNING REVIEW
PROJECT NO. 1612 DATE 02.2017
BLOCK
D IAB RAM S
A-1.2
1-❑
PROPOSED PLAN
0 2' 4' 8' EXST. WALL
NEW WALL
SCALE: 1/4" = 0" DEMO WALL
Implm■l
PROPOSED 2ND FLOOR PLAN
SCALE: 1/4'' = ll' -O"
GU & MING
RESIDENCE
22861 MEDINA LN
CUPERTINO,CA 95014
20370 TOWN CENTER LN
SUITE 139
CUPERTINO, CA 9501 4
408.865.0577
REVISION
09.07.2016 1ST PRELIMINARY PLANNING
02.2017 2ND PRELIMINARY PLANNING R
06.2017 PLANNING REVIEW
10.2017 PLANNING REVIEW
12.2017 PLANNING REVIEW
01.2018 PLANNING REVIEW
05.2018 PLANNING REVIEW 2 �3
PROJECT NO. 1612 DATE 02.2017
PROPOSED
FLOOR PLANS
A-2.0
1-❑
PROPOSED ELEVATION FRONT SOUTH
1'
SCALE: 1/4" V-0"
2-❑
EXISTING ELEVATION FRONT SOUTH
0 - 4' b'
SCALE: 1/4" V-0"
GU & MING
RESIDENCE
22861 MEDINA LN
CUPERTIN❑,CA 95014
2037❑ T❑WN CENTER LN
SUITE 139
CUPERTIN❑, CA 9501 4
408.865.0577
REVISION
09.07.2016 1ST PRELIMINARY PLANNING
02.2017 2ND PRELIMINARY PLANNING R
06.2017 PLANNING REVIEW
10.2017 PLANNING REVIEW
12.2017 PLANNING REVIEW
01.2018 PLANNING REVIEW
05.2018 PLANNING REVIEW
PROJECT NO. 1612 DATE 02.2017
EXISTING &
PROPOSED
FRONT
ELEVATIONS
A-3.0
1-❑
PROPOSED ELEVATION REAR NORTH
0 2' 4' 8'
SCALE: 1/4" V-0"
OwAmml
EXISTING ELEVATION REAR NORTH
0 2' 4' 8'
SCALE: 1/4)) - V-0"
0"
GU & MING
RESIDENCE
22861 MEDINA LN
CUPERTIN❑,CA 95014
20370 TOWN CENTER LN
SUITE 139
CUPERTINO, CA 9501 4
408.865.0577
REVISION
09.07.2016 1ST PRELIMINARY PLANNING
02.2017 2ND PRELIMINARY PLANNING R
06.2017 PLANNING REVIEW
10.2017 PLANNING REVIEW
12.2017 PLANNING REVIEW
01.2018 PLANNING REVIEW
05.2018 PLANNING REVIEW 2 �3
PROJECT NO. 1612 DATE 02.2017
EXISTING &
PROPOSED
REAR
ELEVATIONS
A-3.1
1-❑
PROPOSED ELEVATION WEST
SCALE: 1/4" V-0"
Implm■l
EXISTING ELEVATION WEST
SCALE: 1/4)) - V-0"
0"
11
GU & MING
RESIDENCE
22861 MEDINA LN
CUPERTIN❑,CA 95014
20370 TOWN CENTER LN
SUITE 139
CUPERTIN❑, CA 9501 4
408.865.0577
REVISION
09.07.2016 1ST PRELIMINARY PLANNING
02.2017 2ND PRELIMINARY PLANNING R
06.2017 PLANNING REVIEW
10.2017 PLANNING REVIEW
12.2017 PLANNING REVIEW
01.2018 PLANNING REVIEW
05.2018 PLANNING REVIEW
PROJECT NO. 1612 DATE 02.2017
EXISTING &
PROPOSED
LEFT
ELEVATIONS
A-3.2
1-0
PROPOSED ELEVATION EAST
0 2'
SCALE: 1/4"
0
�n
I
i�
N
— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — -
- — — — — —------------ --------------------- —
8'-0° (E) C.P. 7-7
C-771
O
O
O
0 0
0 o
O
C
0
0
o
a
EXISTING ELEVATION EAST
2-O
SCALE: I/,-'-
12 /-'
12
-z-�4
— — — — — — — — — — — — — — — — — — — — — --
-- - - - - - - - - - - -
- ------------
-Fr 1 1 Tr , , TT TT -F-,' , -T-'r I I Tr "
16'-4"
I
— — — — — — — — — -
-----
v
0
i
GU & MING
RESIDENCE
22861 MEDINA LN
CUPERTIN❑,CA 95014
20370 TOWN CENTER LN
SUITE 139
CUPERTIN❑, CA 9501 4
408.865.0577
09.07.2016 1ST PRELIMINARY PLANNING REV
02.2017 2ND PRELIMINARY PLANNING REVEV
06.2017 PLANNING REVIEW
10.2017 PLANNING REVIEW �,�
12.2017 PLANNING REVIEW / 1
01.2018 PLANNING REVIEW
05.2018 PLANNING REVIEW
PROJECT NO. 1612 DATE 02.2017 1
EXISTING &
PROPOSED
RIGHT
ELEVATIONS
A-3.3
rru
— — — — — — — — — — — — — — — — — — — — — --
-- - - - - - - - - - - -
- ------------
-Fr 1 1 Tr , , TT TT -F-,' , -T-'r I I Tr "
16'-4"
I
— — — — — — — — — -
-----
v
0
i
GU & MING
RESIDENCE
22861 MEDINA LN
CUPERTIN❑,CA 95014
20370 TOWN CENTER LN
SUITE 139
CUPERTIN❑, CA 9501 4
408.865.0577
09.07.2016 1ST PRELIMINARY PLANNING REV
02.2017 2ND PRELIMINARY PLANNING REVEV
06.2017 PLANNING REVIEW
10.2017 PLANNING REVIEW �,�
12.2017 PLANNING REVIEW / 1
01.2018 PLANNING REVIEW
05.2018 PLANNING REVIEW
PROJECT NO. 1612 DATE 02.2017 1
EXISTING &
PROPOSED
RIGHT
ELEVATIONS
A-3.3
PROPOSED CROSS SECTION A -A
A -A
0 2' 4' 8'
SCALE: 1 /4" 1 ' 0"
PROPOSED SECTION B -B
0 2' 4' 8'
SCALE: 1/4" 1 ' 0"
GU & MING
RESIDENCE
22861 MEDINA LN
CUPERTIN❑,CA 95014
20370 TOWN CENTER LN
SUITE 139
CUPERTINO, CA 9501 4
408.865.0577
REVISION
09.07.2016 1ST PRELIMINARY PLANNING
02.2017 2ND PRELIMINARY PLANNING R
06.2017 PLANNING REVIEW
10.2017 PLANNING REVIEW
12.2017 PLANNING REVIEWAl
01.2018 PLANNING REVIEW
PROJECT NO. 1612 DATE 02.2017
PROPOSED
SECTIONS
A3.4
Date: September 6, 2018
Reference
Attachments:
Memo from Haisong Gu (undated)
Drawing: Gu & Ming Residence, 22861 Medina LN, Cupertino, CA 95014
To : De Anza Oaks Homeowners Association
C/O Grayson Property Management
To: City of Cupertino Building Department
To Whom it May Concern,
I am not an architect. Even though I attempted to discern what was shown to me described as being for
my reference, on an impossibly small diagram which I had enlarged, I cannot understand the drawing and
the level of detail presented.
Consequently, I have no idea how this project will affect me during construction nor when finished.
An elevation drawing/sketch of the finished project in relation to my property would also be helpful.
This is not merely "...some renovation to our home.", (paragraph one). This is not a convincing way of
`...reaching out to share plans and address any concerns I may have'; I anticipate much noise from
hammering and the clattering of equipment and dust.
Moreover, the activity will take -place at the property boundary with De Anza Oaks Homeowners
Association, which involves more than myself as a homeowner.
I am requesting that Grayson Property Management inform the Board of Directors of our HOA, that the
Grayson Company contact the City of Cupertino to review concerns, and that The City involve our HOA
and the Grayson Company and any homeowners along the common boundary.
I have gleaned some information from the many details posted at various locations on the drawing, as
follows:
"They will not work prior to 7 am.". REALLY! I don't plan to be disturbed prior to Sam! Especially
because workmen will gather and stage equipment and listen to radio during work hours.
"They can work on weekends if prior approval is granted". NOT IF I HAVE A RIGHT TO QUIET!
The property homeowner of the Medina LN residence has a eucalyptus tree on their property with
branches overhanging on my property; the branches on their side have been removed, but the branches on
my side remain. I want those branches removed from my property and don't want a eucalyptus tree or
pole above my fence line.
Will their HVAC system provide me with unwanted noise when in use?
The height of their second story appears to be 18 feet. Is the base of their property higher than mine? Will
their windows/balcony look into mine?
The drawing lists a fence at a 6 -foot height. I don't want the fence lower than it currently is. Moreover, a
clear definition of enforceable responsibility acceptable to me, if and when the common fence between
the properties needs to be replaced, should be agreed to by our HOA and others along the fence.
I do not have the understanding of other possible concerns because I do not understand the elements that
will affect me in the plan presented to me.
l
�l� p
Gla s Smith
23028 Cricket Hill Road, Cupertino, CA, 95014
Dear Property Owner/Neighbor,
I'm the current owner of 22861 Medina Lane, Cupertino, CA 95014 and am writing to let
you know about a City Council proposal that our family has submitted for some
renovation to our home. You should expect to hear from the City about a hearing in
September regarding this project, but wanted to reach out ahead of time to share with
you our plans and address any concerns you may have.
Our renovation work will be limited to extending our unit into the backyard which
previously housed a pool. Our home is a duplex and the renovation will not make any
changes to the number of units. For your reference, please see attached a draft of our
renovation plan.
If the plan is approved, we will do our utmost to minimize the renovation's impact on
the neighborhood.
Please do not hesitate to reach out via email or phone with any questions or concerns.
Thank you in advance for your cooperation.
Respectfully,
Haisong Gu
22861 Medina Lane #A,
Cupertino, CA 95014
(775) 240-9793
rciharryCD-gmail .com
aN+ETpIWNC WAIL <N> 10T FLOOR <N> 3NO FLOOR GENERAL NOTES
_ ADDITION: ADDITION: GIS & MING
_ YNE�NTRupo RET <N>MB
ABTERDRM. <N>LOFT 1 RESIDENCE
R' L �ENy
ST RM. WIC, HALF BTHRM. xeannmaeuxwr unm...we A..,wa.n B.PR[onraBUAmxu T
E FAMILY ROOM.
NORN
.r' O pp'�I�CALW. N$9- ENTERTAINMENT ROOM a unwe ae<mm.Re..: ro.xe enxe. exm ru, unnn.wx,
F 9-g 25" rxwnux xu 9 MEDINA LN
1 w
CUPE0.TINO
.CA 95v14
:� a
mq 3 . - .3g•
1 l•'
SIPRESS .x, ia.ea.uxe:ur ro.:d`.ArvAP
zG4 N 'ANosc « ro-reo �>SYPRE55 a [B wi: q">w
O YPoN SPP ABO.W'Itm vm.
•} i N �MAIl�E CRABE fW E>SYPRE55 .xne.e„xrvwrie'.'ee. wnnx,oc coe,ow.rt mx °prt "�
mi. Z 1 t- rsr .9 .,.-«� <.x...:Mnu. u....xr.xxn. ..xa.,n...a,a,xPP=FN
,'.CE>SYPRE5S
VICINITY MAP ¢>mIAr TREE ��� I aWN _' • rare r.,PP..L UB•.N[ <
rEm, Yl I A �AWA RS 7PALIOBAY_
GENERAL INFORMATION
ALI
:ods°M ...x.u.�.r..�..<.....,..
wAI Tur
a [s N
N.27 • z �1 .' I M i :j V 1.,.; 5.1�., • ..,�•` I ' PUBLIC UTNTY `` • ,M— F. nxo„v euen xn,. <exnmvx.
IONO :b4 :1:'. ux.
RA.
Hw rtr
aOORRwooFm .[, °; .0 uxoscAPM>c 1 - I I I i r 1r�` '•'F �b yl L I \ .
1 i [ } j1 I [ 1 ral yx RE —RAN. • \, �
rvicx as e9 �.6{ 1 ': = 1 1 M•.j.5� �..;'.t?A i Y � "r L li'i f v: gyp {� EMFNT • �`
IRIMN
r xO[xiMIS ,O w.aB.I 6 UTgltt all : I _ 1 1 i b 11"g • �� �I B�� I £ tf /� ,``�
vx Alev EASEMENT _ , WI i// -',A ;}f,* 1 }tel ```•.1!'.
uvn a wL.r arR n ' Y I1 � f / �bl I •aR
NET LOT—:
rxv aroalea yl
i::io� ae . Isr RLooR I . i y i i �1."i I E
wr�Pe.: FLOOR CALCIBLATIONvrt a' P—DIFFAFREE
RE TO SETBALI[ DNE 31 I
[ UMIRA . 5q MRE i •I' :� I1 y1 'x �� .11 ■c.N NOK9
IT nvv,. ILEA ANCE I. E 1 1iti -: Y1;�' ,1 — ” f asLA511�Yf6'TBO
EASEMENT • 1 ita'Li..iill.0—a ' r F. O
O
_ L
.NO Exv M
nvvx. aaa ev.IT. 1O HHod141
• '""^.JF_�O
@>WALNWAY
.ur..vrt 't' �:•. ."'.'... rs --"-- ---" � <E>PALM EE
o t R I I •�.. o'rw
`,: CY ROvB MOIA LANE
OK
■ I. .rigcyl
.Ba eorr' N895?
4z W8$ i 00 EaPAPRNO
i
PRS -. _ • jnn::::
PROPERTY SETBACKSa
DO
IR 0.WOMi0: BED: ■ _ .'.�.'. '
d R Pe `enxsrii a[AN
H [ xve
a v' +.
asT, O' ac' xAlC gl'ET T QMAIu '
Buri aid w vµlc ■ ' �> \ `~�-� .ti
OE yp i'e 1' 4
,a a0• l .
<N> PORCH
33 BO.FT.•�+`\ Stirs. wWacx
B �\ 2:77 RNaiRxBB
■ a IF. xrPeN e
a, A~NO OOO a eitain AOROM x0 9 nNo uws oi0 I O�O,�(> ` 4\°u J ` lmalie
E�fi lT. alBurONv11Y ;„VINO JURIBOIOTION Or THE Mata
Da LUOE BUT ARE Nor LIMITev rv: �• \a RR3) ' R.IB.IB PLNMIAG RE.¢v I
■ IOa90IN
■ I 0. PRADO WAV ai ` �+
% Y
i -W WAY
O�ARCHITECTLBRAL ........
c»e µ s""c`[µ�CO 6ROPETMC x�:\a �g °9 _,I _Q PROPOSED SITE PLA ■
??1�((FF[[rrO•Ee rucAee [Pnr SITE PLAN
i BOuxvaRxv p• A'6 REALE: ITB'. IUC
r I ° �E•pehev�n eBav[n "OURo J� im! M�
€:a FINE
"oo^€ ^s«.r.n. ■ E �y�a—nom FA-1.0
a.. PADvoa[o uxvea —ORO. ' rU ANue vN rx[ rRweur. +, a
PROJECT•DATA i <N�
CITY OF
IM
CUPERTINO
SUBJECT
COMMUNITY DEVELOPMENT DEPARTMENT
PLANNING DIVISION
CITY HALL
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
TELEPHONE: (408) 777-3308 • FAX: (408) 777-3333
CUPERTINO.ORG
ADMINISTRATIVE HEARING STAFF REPORT
Agenda Date: September 27, 2018
Development Permit and Architectural and Site Approval to consider allowing a 1,016
sq. ft. second floor addition to an existing office building for West Valley Community
Services. (Application(s): DP -2018-06 and ASA -2018-07; Applicant: Josh Selo; Project
Location: 10104 Vista Drive; A.P.N.: 316-24-059)
RECOMMENDED ACTION
That the Hearing Officer adopt the Draft Resolutions to:
1. Find that the proposed actions are exempt from CEQA; and
2. Approve the Development Permit (DP -2018-06) and Architectural and Site Approval
(ASA -2018-07) (See Attachments 1 and 2).
DISCUSSION
Project Data:
Special Area/Neighborhood
Heart of the City Special Area and
Central Stevens Creek Boulevard Subarea
General Plan Designation
Residential Medium 10-20 dwelling units per acre
Zoning Designation
P (CG, Res)
Existing
Proposed
Lot Size
51,270 sq. ft. (1.18 acres)
No Change
Lot Coverage
33%
No Change
WVCS Total (sq. ft.)
5,177
6,193
First Floor (sq. ft.)
3,284
No Change
Second Floor (sq. ft.)
1,893
2,909
Total Building Height
28'
No Change
Project Consistency With:
General Plan
Yes
Zoning
Yes
Environmental Review
Categorically Exempt per Section 15301 of the
California Environmental Quality Act (CEQA)
Background:
Site Description
The property is located
approximately 200 feet north of
the Stevens Creek Boulevard
and Vista Drive intersection on
the east side of Vista Drive. The
property is located within the
Central Stevens Creek
Boulevard Subarea of the Heart
of the City Special Area (See
Figure 1). The surrounding
uses are comprised of
townhomes, with single family
residential uses beyond, to the
north; commercial, commercial
office, and office to the south;
office, commercial office, and
residential uses to the east;
commercial office and higher
density (townhomes) to the
west.
Previous Approvals
A.
Figure 1: Aerial
The Planning Commission approved a Use Permit (U-2000-14) and a Heart of the City
Exception (EXC-2000-10) in December 2000 to permit the construction of a 5,225 square
.�
Figure 2: Site Configuration
1-11
WVCS Office
Building
[2]
Residences
3]
Carports
administrative office building/residential community building, 12 one -bedroom and 12
two-bedroom affordable apartments with 52 shared residential and office parking spaces
on a 1.18 -acre vacant lot (See Figure 2). Specifically, the office and community building
were permitted to be used for general office uses and all other associated programming
and services, offered by West Valley Community Services' (WVCS). WVCS provides
services that include a food pantry, clothing distribution, emergency financial assistance,
financial coaching, family support, access to public health and food assistance benefits,
case management, and referral services.
Analysis:
Application Requests
The applicant, Josh Selo, Executive Director of WVCS, is requesting that the City permit
the addition of 1,016 sq. ft. to the second floor of the existing WVCS building. WVCS is
not increasing staffing, programming, modifying the uses nor the hours of operation. As
part of this proposal, West Valley will be reconfiguring the internal space of the entire
building to provide the following operational improvements:
■ Relocate the existing conference room to accommodate all required staff and board
members at meetings
■ Convert existing cubicle space into additional food pantry storage to address
community need
■ Utilize the entire food pantry area for services, rather than reserving some as storage
area, to allow for more clients to walk through the pantry at one-time
■ Improve space efficiency of meeting rooms and office space
Architectural Design
The addition will extend the second floor to the west (toward Vista Drive) to
accommodate for three new offices and to the north (internal) for the new conference
Area (in sq. ft.)
Existing
Net Change
Proposed
Food Pantry
683
275
958
Staff and Client Meeting Rooms
1,208
575
1,783
Staff Offices
1,239
166
1,405
Reception
610
-
610
Resident Laundry
87
-
87
Other: Corridors, storage,, restrooms, etc.
1,350
-
1,350
TOTAL
5,177
1,016
6,193
Architectural Design
The addition will extend the second floor to the west (toward Vista Drive) to
accommodate for three new offices and to the north (internal) for the new conference
room. It will be located above a portion of the building that is currently single -story and
will be within the footprint of the existing building. In order to maintain architectural
integrity, the proposal will maintain the existing horizontal and vertical wood siding,
roof brackets, and composition shingle roof on the addition; and install a new wood trellis
on the first -story portion below the area where three new offices are proposed on the
second floor. The trellis will provide architectural relief to the western elevation that faces
Vista Drive and will match the existing trellis to the north elevation.
Vehicular and Bicycle Parking
With the original Use Permit, the development was approved with 52 stalls when the
number of stalls required per the Municipal Code was 66 stalls (i.e. less than the Parking
Ordinance standard of two stalls/unit.) A parking management plan was required to
ensure that there would not be any impacts to the neighborhood (See Attachment 5 for
WVCS Parking Management Plan). In addition, a condition of approval was added to the
resolution that, at the City's discretion, WVCS may be required to modify their uses or
revise the parking management plan, if the use of the office space proved to be too intense
and affected the neighborhood. However, no changes have been required so far since no
impacts have been felt.
At this time, WVCS is proposing to add square footage without intensifying the
programming but is not proposing additional parking. For Planned Development zones,
such as this property, reduced parking standards may be approved if validated through
a parking study that determines that adequate parking has been provided for the
proposed uses. To that end, Hexagon Transportation Consultants, was retained by the
City to conduct a parking study to evaluate on-site parking demand and availability. The
parking study was conducted on three weekdays in April (See Attachment 4). The
parking study determined that the highest parking demand at the site was 36 stalls. Since
the site has 52 spaces, there were 15 vacant spaces still available at the site at that time.
Therefore, the site is adequately parked for the uses on the site. As previously noted, the
City has the authority to re-evaluate the uses or the parking at the site, in the event that
there are neighborhood impacts.
Environmental Review
This project is categorically exempt from the requirements of the California
Environmental Quality Act (CEQA) per Section 15301(e) — Existing Facilities because the
exemption applies to the addition of up to 10,000 sq. ft. in an area where all public services
and facilities are available to allow for maximum development permissible in the General
Plan and the project is not located in an environmentally sensitive area.
Other Department/Agency Review
The City's Public Works Department; Building Division; Environmental Programs
Division; and the Santa Clara County Fire Department reviewed the request and have no
objections to the project. Environmental Services' comments are incorporated as
conditions of approval.
PUBLIC NOTICING AND COMMUNITY OUTREACH
The following table is a brief summary of the noticing done for thisproject:
Notice of Public Meeting & Site Signage
Agenda
• Site Signage (10 days prior to hearing)
• Posted on the City's official notice
• 8 notices mailed to property owners
bulletin board (one week prior to hearing)
adjacent to the project site (10 days
• Posted on the City of Cupertino's Web
prior to hearing)
site (one week prior to hearing)
No public comments were received at the time of production of this staff report.
PERMIT STREAMLINING ACT
This matter is adjudicatory and is subject to the Permit Streamlining Act (Government
Code Section 65920 — 65964). The City has complied with the deadlines found in the
Permit Streamlining Act.
Project Received: June 28, 2018; Deemed Incomplete: July 27, 2018
Project Resubmitted: September 9, 2018; Deemed Complete: September 11, 2018
The City has 60 days (until November 10, 2018) to make a decision on the project.
CONCLUSION
Staff recommends approval of the Development Permit and Architecture and Site
Approval because the project is consistent with the General Plan, and zoning ordinances,
and conforms to Chapters 19.144 and 19.168 of the Cupertino Municipal Code.
Additionally, all of the findings for approval of the proposed project, consistent with the
Cupertino Municipal Code, may be made as reflected in the Draft Resolutions.
NEXT STEPS
The permit will be effective 14 calendar days from the date of the hearing. The decision
of the Administrative Hearing Officer is final, unless appealed within 14 calendar days
from the date of the hearing. The applicant may apply for building and/or other permits
with the City at the end of the appeal period.
This approval is valid until September 27, 2020. The applicant may apply for a one-time
one-year extension before the approval expires.
Prepared by- Ellen Yau, Associate Planner
Reviewed and Approved by: Piu Ghosh, Principal Planner
ATTACHMENTS
1. Draft Resolution for DP -2018-06
2. Draft Resolution for ASA -2018-07
3. Plan Set
4. Parking Study
5. Vista Village Parking Management Plan
DP -2018-06
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
103t7.111Wa 01601RUKOM
OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF
CUPERTINO APPROVING A DEVELOPMENT PERMIT TO ALLOW FOR A
1,016 SQ. FT. SECOND FLOOR ADDITION LOCATED AT 10104 VISTA DRIVE
(APN 316-24-059)
SECTION I: PROTECT DESCRIPTION
Application No.: DP -2018-06
Applicant: Josh Selo (West Valley Community Services)
Location: 10104 Vista Drive
SECTION II: FINDINGS FOR ARCHITECTURAL AND SITE APPROVAL PERMIT:
WHEREAS, the City of Cupertino received an application for a Development Permit to
consider allowing a 1,016 sq. ft. second story addition, as described in Section I. of this
Resolution; and
WHEREAS, the necessary public notices have been given as required by the Procedural
Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at
least one public meeting in regard to the application; and
WHEREAS, the project is determined to be exempt from the California Environmental
Quality Act (CEQA); and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, the Administrative Hearing Officer finds as follows with regard to this
application:
1. The proposed development, at the proposed location, will not be detrimental or
injurious to property or improvements in the vicinity, and will not be detrimental to
the public health, safety, general welfare, or convenience;
The current building is a two-story administrative office for West Valley Community
Services and is located towards the interior of the property with one elevation facing Vista
Drive and visible from the public right-of-way. The zoning district allows the construction
Draft Resolution DP -2018-06 September 27, 2018
Page 2
of building of up to 45 feet in height while the existing building is measured at 28'. The
proposal is a second story addition, that will not further increase the height of the building
but will modify the western and northern elevation. However, even with the addition there
will continue to be sufficient setback from adjacent properties. In addition, the proposed
addition is located directly above an existing single story portion of the building and will
not increase the existing footprint of the building. Therefore, the proposal will not be
detrimental or injurious to property or improvements in the vicinity.
2. The proposed development will be located and conducted in a manner in accord
with the Cupertino Comprehensive General Plan and the purpose of this title and
complies with the California Environmental Quality Act (CEQA).
The proposed development is in conformance with the Cupertino General Plan and the
proposal has met the development standards as defined by the Heart of the City Specific Plan
and the City Municipal Code such as heights and setbacks. The site is within a Planned
Development Zoning District that supports flexibility in parking standards. The parking
study supports the proposed addition and concludes that additional parking stalls are not
required for this project. Therefore, the proposed development is consistent with the
Cupertino General Plan.
The project is categorically exempt from CEQA under Section 15301 since it is an addition
to an existing structure of less than 10,000 sq. ft.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of the maps, facts, exhibits, testimony, staff's report and
presentation, and other evidence submitted in this matter, subject to the conditions which
are enumerated in this Resolution beginning on PAGE 4 thereof,:
The application for a Architectural and Site Approval, Application no. DP -2018-06 is
hereby approved and that the subconclusions upon which the findings and conditions
specified in this resolution are based and contained in the Public Hearing record
concerning Application no. DP -2018-06 as set forth in the Minutes of the Administrative
Hearing Meeting of September 27, 2018 and are incorporated by reference as though fully
set forth herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPT.
1. APPROVED EXHIBITS
Approval is based on the plan set drawn by Adaptive Architecture entitled "West
Valley Community Services Office Addition" consisting of seven (7) sheets labeled as
Draft Resolution DP -2018-06 September 27, 2018
Page 3
A0.1, ALL A1.2, A2.1, A2.2, A3.1, and A4.1, except as may be amended by conditions
in this resolution.
2. ACCURACY OF PROTECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks, property
size, building square footage, any relevant easements and/or construction records.
Any misrepresentation of any property data may invalidate this approval and may
require additional review.
3. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the
first page of the building plans.
4. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file no. ASA -2018-07 shall be applicable to
this approval.
5. PREVIOUS APPROVAL CONDITIONS
The conditions of approval contained in file nos. U-2000-14 and EXC-2000-10 shall be
applicable to this approval.
6. BUILDING AND FIRE CODE
The applicant shall apply for and obtain building permits to allow the construction of
the approved project. The applicant shall provide information and plans to allow the
Building Official and the Fire Marshall or their designee that the proposed plans
comply with Building and Fire Codes in effect at the time of application for a building
permit.
7. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS
a) All grading activities shall be limited to the dry season (April 15 to October 1),
unless permitted otherwise by the Director of Public works.
b) Construction hours and noise limits shall be compliant with all requirements of
Chapter 10.48 of the Cupertino Municipal Code.
c) Grading, street construction, underground utility and demolition hours for work
done more than 750 feet away from residential areas shall be limited to Monday
through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m.
Grading, street construction, demolition or underground utility work within 750
feet of residential areas shall not occur on Saturdays, Sundays, holidays, and
during the nighttime period as defined in Section 10.48.053(b) of the Municipal
Code.
Draft Resolution DP -2018-06 September 27, 2018
Page 4
d) Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m.
and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed
on holidays as defined in Chapter 10.48 of the Municipal Code. Night time
construction is allowed if compliant with nighttime standards of Section 10.48 of
the Cupertino Municipal Code.
e) Rules and regulations pertaining to all construction activities and limitations
identified in this permit, along with the name and telephone number of an
applicant appointed disturbance coordinator, shall be posted in a prominent
location at the entrance to the job site.
f) The applicant shall be responsible for educating all contractors and subcontractors
of said construction restrictions.
g) The applicant shall comply with the above grading and construction hours and
noise limit requirements unless otherwise indicated
8. DUST CONTROL
The following construction practices shall be implemented during all phases of
construction for the proposed project to prevent visible dust emissions from leaving
the site:
a) Water all active construction areas at least twice daily and more often during
windy periods to prevent visible dust from leaving the site; active areas adjacent
to windy periods; active areas adjacent to existing land uses shall be kept damp at
all times, or shall be treated with non-toxic stabilizers or dust palliatives.
b) Cover all trucks hauling soil, sand, and other loose materials or require all trucks
to maintain at least 2 feet of freeboard;
c) Pave, apply water at least three times daily, or apply (non-toxic) soil stabilizers on
all unpaved access roads, parking areas and staging areas at construction sites.
d) Sweep streets daily, or more often if necessary (preferably with water sweepers) if
visible soil material is carried onto adjacent public streets.
e) The applicant shall incorporate the City's construction best management practices
into the building permit plan set.
9. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
10. INDEMNIFICATION
Except as otherwise prohibited by law, the applicant shall indemnify and hold
harmless the City, its City Council, and its officers, employees and agents (collectively,
Draft Resolution DP -2018-06 September 27, 2018
Page 5
the "indemnified parties") from and against any claim, action, or proceeding brought
by a third party against one or more of the indemnified parties or one or more of the
indemnified parties and the applicant to attack, set aside, or void this Resolution or
any permit or approval authorized hereby for the project, including (without
limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense
of the litigation. The applicant shall pay such attorneys' fees and costs within 30 days
following receipt of invoices from City. Such attorneys' fees and costs shall include
amounts paid to counsel not otherwise employed as City staff and shall include City
Attorney time and overhead costs and other City staff overhead costs and any costs
directly related to the litigation reasonably incurred by City.
11. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant to
Government Code Section 66020(d) (1), these Conditions constitute written notice of
a statement of the amount of such fees, and a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90 -day
approval period in which you may protest these fees, dedications, reservations, and
other exactions, pursuant to Government Code Section 66020(a), has begun. If you
fail to file a protest within this 90 -day period complying with all of the requirements
of Section 66020, you will be legally barred from later challenging such exactions.
PASSED AND ADOPTED this 27th day of September, 2018 at a noticed Administrative
Hearing of the City of Cupertino, State of California, held by the Administrative Hearing
Officer, pursuant to Cupertino Municipal Code Section 19.12.120.
ATTEST: APPROVED:
Ellen Yau
Associate Planner
Benjamin Fu
Assistant Director of Community Development
ASA -2018-07
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
103t7.111Wa 01601RUKOM
OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF
CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL
PERMIT TO ALLOW FOR A 1,016 SQ. FT. SECOND FLOOR ADDITION
LOCATED AT 10104 VISTA DRIVE (APN 316-24-059)
SECTION 1: PROTECT DESCRIPTION
Application No.: ASA -2018-07
Applicant: Josh Selo (West Valley Community Services)
Location: 10104 Vista Drive
SECTION II: FINDINGS FOR ARCHITECTURAL AND SITE APPROVAL PERMIT:
WHEREAS, the City of Cupertino received an application for an Architectural and Site
Approval to consider allowing a 1,016 sq. ft. second story addition, as described in Section
I. of this Resolution; and
WHEREAS, the necessary public notices have been given as required by the Procedural
Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at
least one public meeting in regard to the application; and
WHEREAS, the project is determined to be exempt from the California Environmental
Quality Act (CEQA); and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, the Administrative Hearing Officer finds as follows with regard to this
application:
1. The proposed development, at the proposed location, will not be detrimental or
injurious to property or improvements in the vicinity, and will not be detrimental to
the public health, safety, general welfare, or convenience;
The current building is a two-story administrative office for West Valley Community
Services and is located towards the interior of the property with one elevation facing Vista
Drive and visible from the public right-of-way. The zoning district allows the construction
Draft Resolution ASA -2018-07 September 27, 2018
Page 2
of building of up to 45 feet in height while the existing building is measured at 28'. The
proposal is a second story addition, that will not further increase the height of the building
but will modify the western and northern elevation. However, even with the addition there
will continue to be sufficient setback from adjacent properties. In addition, the proposed
addition is located directly above an existing single story portion of the building and will
not increase the existing footprint of the building. Therefore, the proposal will not be
detrimental or injurious to property or improvements in the vicinity.
2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan
any specific plan, zoning ordinances, applicable planned development permit,
conditional use permits, variances, subdivision maps or other entitlements to use
which regulate the subject property including, but not limited to, adherence to the
following specific criteria:
a) Abrupt changes in building scale should be avoided. A gradual transition related
to height and bulk should be achieved between new and existing buildings.
The scale of the building will be maintained with no changes to the height of the building.
Although the addition will increase the floor area of the building and increase the volume,
the proposal maintains varied wall and roof setbacks that will provide architectural
articulation. Additionally, architectural features such as consistent roof brackets and
locations, and the installation of a new wood trellis will further enhance the addition and
mitigate the overall building mass.
b) In order to preserve design harmony between new and existing building and in
order to preserve and enhance property values, the materials, textures and colors
of new building should harmonize with adjacent development by being consistent
or compatible with design and color schemes with the future character of the
neighborhoods and purposes of the zone in which they are situated. The location,
height and materials of walls, fencing, hedges and screen planting should
harmonize with adjacent development. Unsightly storage areas, utility
installations and unsightly elements of parking lots should be concealed. The
planting of ground cover or various types of pavements should be used to prevent
dust and erosion, and the unnecessary destruction of existing healthy trees should
be avoided. Lighting for development should be adequate to meet safety
requirements as specified by the engineering and building departments, and
provide shielding to prevent spill-over light to adjoining property owners.
The new addition will utilize the existing horizontal and vertical paneling patterns to
preserve design harmony and integrity. The location of utility and storage areas remain
unchanged and located at the rear of the building. Furthermore, existing trees in the front
are preserved and will help to mitigate impacts of the addition to the public right-of-way.
Draft Resolution ASA -2018-07 September 27, 2018
Page 3
c) The number, location, color, size, height, lighting and landscaping of outdoor
advertising signs and structures have been designed to minimize traffic hazard,
positively affect the general appearance of the neighborhood and harmonize with
adjacent development.
Signage approval is not included in this application and the applicant does not wish to
propose any new signage.
d) With respect to new projects within existing residential neighborhoods, new
development should be designed to protect residents from noise, traffic, light and
visually intrusive effects by use of buffering, setbacks, landscaping, walls and
other appropriate design measures.
Additional windows are proposed on the second floor, but the height of the windows are six
feet in height measured from finished floor to window sill and will, therefore, not create
privacy issues to the existing residences to the north.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of the maps, facts, exhibits, testimony, staff's report and
presentation, and other evidence submitted in this matter, subject to the conditions which
are enumerated in this Resolution beginning on PAGE 4 thereof,:
The application for a Architectural and Site Approval, Application no. ASA -2018-07 is
hereby approved and that the subconclusions upon which the findings and conditions
specified in this resolution are based and contained in the Public Hearing record
concerning Application no. ASA -2018-07 as set forth in the Minutes of the Administrative
Hearing Meeting of September 27, 2018 and are incorporated by reference as though fully
set forth herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPT.
1. APPROVED EXHIBITS
Approval is based on the plan set drawn by Adaptive Architecture entitled "West
Valley Community Services Office Addition" consisting of seven (7) sheets labeled as
A0.1, A1.1, A1.2, A2.1, A2.2, A3.1, and A4.1, except as may be amended by conditions
in this resolution.
2. ACCURACY OF PROTECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks, property
Draft Resolution ASA -2018-07 September 27, 2018
Page 4
size, building square footage, any relevant easements and/or construction records.
Any misrepresentation of any property data may invalidate this approval and may
require additional review.
3. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the
first page of the building plans.
4. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file no. DP -2018-06 shall be applicable to this
approval.
5. PREVIOUS APPROVAL CONDITIONS
The conditions of approval contained in file nos. U-2000-14 and EXC-2000-10 shall be
applicable to this approval.
6. EXTERIOR BUILDING MATERIALS/TREATMENTS
The final building exterior plan shall closely resemble the details shown on the
original approved plans. Final building exterior treatment plan (including but not
limited to details on exterior color, materials, architectural treatments, doors,
windows, lighting fixtures, and/or embellishments) shall be reviewed and approved
by the Director of Community Development prior to issuance of building permits to
ensure quality and consistency. Any exterior changes determined to be substantial
by the Director of Community Development shall either require a modification to this
permit or a new permit based on the extent of the change.
7. SCREENING
All mechanical and other equipment on the building or on the site shall be screened
so they are not visible from public street areas or adjoining developments. Screening
materials/colors shall match building features and materials. The height of the
screening shall be taller than the height of the mechanical equipment that it is
designed to screen. The location of equipment and necessary screening shall be
reviewed and approved by the Director of Community Development prior to issuance
of building permits.
8. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
Draft Resolution ASA -2018-07 September 27, 2018
Page 5
9. INDEMNIFICATION
Except as otherwise prohibited by law, the applicant shall indemnify and hold
harmless the City, its City Council, and its officers, employees and agents (collectively,
the "indemnified parties") from and against any claim, action, or proceeding brought
by a third party against one or more of the indemnified parties or one or more of the
indemnified parties and the applicant to attack, set aside, or void this Resolution or
any permit or approval authorized hereby for the project, including (without
limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense
of the litigation. The applicant shall pay such attorneys' fees and costs within 30 days
following receipt of invoices from City. Such attorneys' fees and costs shall include
amounts paid to counsel not otherwise employed as City staff and shall include City
Attorney time and overhead costs and other City staff overhead costs and any costs
directly related to the litigation reasonably incurred by City.
10. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant to
Government Code Section 66020(d) (1), these Conditions constitute written notice of
a statement of the amount of such fees, and a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90 -day
approval period in which you may protest these fees, dedications, reservations, and
other exactions, pursuant to Government Code Section 66020(a), has begun. If you
fail to file a protest within this 90 -day period complying with all of the requirements
of Section 66020, you will be legally barred from later challenging such exactions.
PASSED AND ADOPTED this 27th day of September, 2018 at a noticed Administrative
Hearing of the City of Cupertino, State of California, held by the Administrative Hearing
Officer, pursuant to Cupertino Municipal Code Section 19.12.120.
ATTEST: APPROVED:
Ellen Yau
Associate Planner
Benjamin Fu
Assistant Director of Community Development
ABBREVIATIONS
DRAWIN
N
WEST VALLEY COMMUNITY SERVICES
G SYMBOL LEGEND
PROJECT NORTH
COLUMN REFERENCE GRIDS
8,23 = COLUMN DESIGNATION
ELEVATION
4 4 = ELEVATION DESIGNATION
A5.1
A5.1 = REFERENCE DRAWING NUMBER
ARROW INDICATES DIRECTION OF VIEW
BUILDING SECTION
C = SECTION DESIGNATION
- - A5.2 = REFERENCE DRAWING NUMBER
A5.2 ARROW INDICATES DIRECTION OF VIEW
WALL SECTION
E _ _ E = SECTION DESIGNATION
A5.3 A5.3 = REFERENCE DRAWING NUMBER
ARROW INDICATES DIRECTION OF VIEW
DETAIL
10 1 0 = DETAIL DESIGNATION
8 3 8.3 = REFERENCE DRAWING NUMBER
LOBBY CODE ANALY515
E1 6 LOBBY = ROOM NAME
900 E I = OCCUPANCY GROUP
45 G = SPACE USE - REF SPACE USE SCHEDULE
900 = FLOOR AREA - SQUARE FEET
45 = OCCUPANT LOAD (CDC TABLE I 0-A)
= OCCUPANT LOAD SIGN REQUIRED
WHEN NOTED - ( CDC SEC 1002.3 )
REF SIGNAGE SCHEDULE
FFE 01-o° LEVEL LINE, CONTROL POINT
FFE 0'-0" = ELEVATION
MATCH LINE AND AREA
Q DESIGNATOR
SHADED PORTION IS THE SIDE CONSIDERED
CENTER LI N E5, ELOOK LINES
AND LEVEL LINES
SECTION LINES
PROPERTY LINES, BOUNDRY
LINES AND MATCH LINES
- - - - HIDDEN CONSTRUCTION
FEATU RE
BREAKS OF BUILDING
COMPONENTS
REV15ION
A3 = REVISION NUMBER
O GLAZED OPENING OR
WIN DOW TYPE
5o DOOR IDENTIFICATION
50 = DOOR NUMBER
OFFICE ADDITION
10 I 04 VISTA DRIVE
CUPERTINO, CA 95014
APPLICABLE CODES
201 G BUILDING STANDARDS ADMINISTRATIVE CODE PART 1, TITLE waGORNE1 AS
RH
24 C.C.R.
201 G CALIFORNIA BUILDING CODE (CBC) PART 2, TITLE 24 C.C.R. „.�.,,.. I
(20 1 5 INTERNATIONAL BUILDING CODE (IBC) W/ CALIFORNIA
AMENDMENTS.
201 G CALIFORNIA PLUMBING CODE (CPC) ,IHahWed
�,
201 G CALIFORNIA MECHANICAL CODE (CMC)
201 G CALIFORNIA ELECTRICAL CODE (CEC)
201 G CALIFORNIA FIRE CODE (CFC)
201 G CALIFORNIA GREEN BUILDING CODE }
201 G CALIFORNIA ENERGY CODE
CUPERTINO MUNICIPAL CODE
PROJECT TEAM
OWNER
WEST VALLEY COMMUNITY SERVICES
CONTACT: JOSH SELO
10 104 VISTA DR
CUPERTINO, CA 95014
(408) 954-G 1 13
ARCHITECT
ADAPTIVE ARCHITECTURE
CONTACT: JANICE YEH
201 1 1 STEVENS CREEK BLVD
SUITE 270
CUPERTINO, CA 95014
(408) 8G5-1089
SCOPE Of WORK
THE PROJECT SCOPE OF WORK INCLUDES THE FOLLOWING:
1. A 1,0 1 G SQ. IT. ADDITION TO EXISTING 2-5TORY
ADMINISTRATIVE BUILDING (CCS BLDG).
CODE ANALYSIS
A. BUILDING CODE ANALYSIS:
TYPE OF CONSTRUCTION: V -B
OCCUPANCY TYPE: B
AUTOMATIC FIKE SPRINKLER? YES
BASIC ALLOWABLE AREA PER CBC TABLE 503: 27,000 SF
PROPOSED BUILDING AREA: G, 193 SF
B. PLUMBING FIXTURE CALCULATIONS (CPC TABLE 422. 1):
NUMBER OF OCCUPANTS PER CPC TABLE A:
G, 193 / 200 = 31 OCCUPANTS
o PLUMBING FIXTURES:
(BASED ON I G MALE * I G FEMALE OCCUPANTS)
And
F.O.S.
Face of Studs
SECT.
Section
L
Angle
FT.
Foot or Feet
SH
Shelf
@
At
FTG.
Footing
SHT.
Sheet
CL
2
FW
Fire Water
SHWK.
Shower
NO
Centerline
BY
a jW10
SIM.
Similar
-0
Diameter or
GA.
Gauge
SPEC.
Specification
A I I
Round
GALV.
Galvanized
SQ.
Square
d
Penny (Nails)
G. D.
Grab Bar
SST.
Stainless
#
Pound
GI
Galvanized
rtrtay'
-
Steel
(N)
Ing
Iron
STD.
Standard
New
GL.
Glass
STL.
Steel
(K)
Relocated
GND.
Ground
STOR.
Storage
ACC
Accessible
GK.
Grade
STRUCT.
Structural
A/C
Air
GS
Galvanized
SUSP,
Suspended
s
Conditioning
Steel
SYM.
Symmetrical
A.C.
Asphaltic
GYP.
Gypsum
SYS.
System
Conc.
ACOUS.
Acoustical
H. B.
Hose Bibb
T. 13.
Towel Bar
A. D.
Area Drain
H.C.
Hollow Core
TEL.
Telephone
-ADJ.
Adjustable
HDR.
Header
TER.
Terrazzo
ALT.
Alternate
HDWD.
Hardwood
THK.
Thick
ALUM.
Aluminum
HDWK.
Hardware
T.* G.
Tongue
APPROX.
Approximate
H. m.
Hollow Metal
Groove
ARCH.
Architectural
HORIZ.
Horizontal
T.O.C.Top
of Curb
HT.
Height
T.O.C. D. Top of
BD.
Board
Concrete
BITUM,
Bituminous
1. D.
Inside
Deck
BLDG.
Building
Diameter
T.O.P.
Top of
BILK.
Block
INSUL.
Insulation
Pavement /
BLKG.
Blocking
INT.
Interior
Top of
B. M.
Bench Mark
Parapet
BFP.
Backflow
JAN.
Janitor
T. 0. R. D.
Top of Roof
Preventer
Deck
BOT.
Bottom
KIT.
Kitchen
T.O.S.
Top of
Sheathi ngg
CAB.
Cabinet
LAB.
Laboratory
T.O.W.
Top of Wall
C. B.
Chalk Board
LAM.
Laminate
TRD.
Tread
CEM.
Cement
LAV.
lavatory
T.S.W.
Top of
CER.
Ceramic
LKR.
Locker
Sidewalk
C. 1.
Cast Iron
LT.
Light
T.V.
Television
C.J.
Const. Joint
TYP.
Typical
C. L.
Chain Link
MAINT.
Maintenance
CLG.
Ceiling
MAT.
Material
U. L.
Underwriters
CLK.
Clear
MAX.
Maximum
Laboratory
CNTR.
Counter
M. D.
Machine Bolt
U.N.O.
Unless Noted
COL.
Column
M.D.F.
Medium
Otherwise
CONC.
Concrete
Density
U.O.N.
Unless
CONN.
Connection
Fiberboard
Otherwise
CONST.
Construction
MECH,
Mechanical
Noted
CONT.
Continuous
MEMS.
Membrane
COKK.
Corridor
MEZZ.
Mezzanine
V.C.T.
Vinyl
CPT.
Carpet
MFK.
Manufacturer
Composition
CTSK.
Countersunk
MH.
Manhole
Tile
CTR.
Center
MIN.
Minimum
VERT.
Vertical
CW.
Cold Water
MIR.
Mirror
VEST.
Vestibule
MISC.
Miscellaneous
V.T.R.
Vent Through
DBL.
Double
M. 0.
Masonry
Roof
DEPT.
Department
Opening
V.W.C.
Vinyl Wall
D.F.
Drinking
MTD.
Mounted
Covering
Fountain /
MTL.
Metal
Douglas Fir
MUL.
Mullion
W
West
DIA.
Diameter
w/
With
DIAG.
Diagonal
N
North
W.C.
Water Closet
DIM,
Dimension
N.I.C.
Not In
WD.
Wood
DISP.
Dispenser
Contract
WDW.
Window
-0N.
Down
No. or #
Number
W/O
Without
DK.
Door
NOM
Nominal
W.S.
Wood Screw
DS.
Downspout
N.T.S.
Not To Scale
WT.
Weight
D.S.P.
Dry StandPipe
W.W.F.
Welded Wire
DTL.
Detail
OD
Outside
Fabric
DWG.
Drawing
Diameter
DWK.
Drawer
O.A.
Overall
O.C.
On Center
EA.
Each
OFF.
Office
E.J.
Expansion
OPP.
Opposite
Joint
OPER
Operable
EL.
Elevation
ELEC.
Electrical
P. L.C.C.
Plastic Laminate
ELEV.
Elevator
Covered
EMEK.
Emergency
Casework
ENCL.
Enclosure
PA
Plantingg Area
EQ.
Equal
PH
Panic I�ardware
EQPT.
Equipment
PLAS.
Plaster
E.W.
Each Way
PLYWD.
Plywood
EXH.
Exhaust
PNL.
Panel
EXP.
Expansion
PK.
Pair
EXT.
Exterior
PT.
Point
P. LAM.
Plastic Laminate
F.A.
Fire Alarm
F.D.
Floor Drain
Q.T.
Quarry Tile
FDN.
Foundation
F.E.
Fire
R
Riser
Extinguisher
K. D.
Roof Drain
FEC
Fire
REF.
Reference
Extinguisher
KEFK.
Kefrigerator
Cabinet
REG.
Kegister
F.F.
Finish Floor
REINF.
Reinforced
F.G.
Finish Grade
REQ.
Required
F.H.
Flat Head
KESIL.
Kesilient
FHC
Fire Hose Cab.
R.H
Round Head
FIN.
Finish
RM.
Room
FLASH.
Flashing
R.O.
Rough Opening
FLK.
Floor
RWD.
Redwood
FLUOK.
Fluorescent
F.O.C.
Face of Conc.
S.
South
F.O.F.
Face of Finish
S.C.
Solid Core
F.O.M.
Face of
SCHED.
Schedule
Masonry
DRAWIN
N
WEST VALLEY COMMUNITY SERVICES
G SYMBOL LEGEND
PROJECT NORTH
COLUMN REFERENCE GRIDS
8,23 = COLUMN DESIGNATION
ELEVATION
4 4 = ELEVATION DESIGNATION
A5.1
A5.1 = REFERENCE DRAWING NUMBER
ARROW INDICATES DIRECTION OF VIEW
BUILDING SECTION
C = SECTION DESIGNATION
- - A5.2 = REFERENCE DRAWING NUMBER
A5.2 ARROW INDICATES DIRECTION OF VIEW
WALL SECTION
E _ _ E = SECTION DESIGNATION
A5.3 A5.3 = REFERENCE DRAWING NUMBER
ARROW INDICATES DIRECTION OF VIEW
DETAIL
10 1 0 = DETAIL DESIGNATION
8 3 8.3 = REFERENCE DRAWING NUMBER
LOBBY CODE ANALY515
E1 6 LOBBY = ROOM NAME
900 E I = OCCUPANCY GROUP
45 G = SPACE USE - REF SPACE USE SCHEDULE
900 = FLOOR AREA - SQUARE FEET
45 = OCCUPANT LOAD (CDC TABLE I 0-A)
= OCCUPANT LOAD SIGN REQUIRED
WHEN NOTED - ( CDC SEC 1002.3 )
REF SIGNAGE SCHEDULE
FFE 01-o° LEVEL LINE, CONTROL POINT
FFE 0'-0" = ELEVATION
MATCH LINE AND AREA
Q DESIGNATOR
SHADED PORTION IS THE SIDE CONSIDERED
CENTER LI N E5, ELOOK LINES
AND LEVEL LINES
SECTION LINES
PROPERTY LINES, BOUNDRY
LINES AND MATCH LINES
- - - - HIDDEN CONSTRUCTION
FEATU RE
BREAKS OF BUILDING
COMPONENTS
REV15ION
A3 = REVISION NUMBER
O GLAZED OPENING OR
WIN DOW TYPE
5o DOOR IDENTIFICATION
50 = DOOR NUMBER
OFFICE ADDITION
10 I 04 VISTA DRIVE
CUPERTINO, CA 95014
APPLICABLE CODES
201 G BUILDING STANDARDS ADMINISTRATIVE CODE PART 1, TITLE waGORNE1 AS
RH
24 C.C.R.
201 G CALIFORNIA BUILDING CODE (CBC) PART 2, TITLE 24 C.C.R. „.�.,,.. I
(20 1 5 INTERNATIONAL BUILDING CODE (IBC) W/ CALIFORNIA
AMENDMENTS.
201 G CALIFORNIA PLUMBING CODE (CPC) ,IHahWed
�,
201 G CALIFORNIA MECHANICAL CODE (CMC)
201 G CALIFORNIA ELECTRICAL CODE (CEC)
201 G CALIFORNIA FIRE CODE (CFC)
201 G CALIFORNIA GREEN BUILDING CODE }
201 G CALIFORNIA ENERGY CODE
CUPERTINO MUNICIPAL CODE
PROJECT TEAM
OWNER
WEST VALLEY COMMUNITY SERVICES
CONTACT: JOSH SELO
10 104 VISTA DR
CUPERTINO, CA 95014
(408) 954-G 1 13
ARCHITECT
ADAPTIVE ARCHITECTURE
CONTACT: JANICE YEH
201 1 1 STEVENS CREEK BLVD
SUITE 270
CUPERTINO, CA 95014
(408) 8G5-1089
SCOPE Of WORK
THE PROJECT SCOPE OF WORK INCLUDES THE FOLLOWING:
1. A 1,0 1 G SQ. IT. ADDITION TO EXISTING 2-5TORY
ADMINISTRATIVE BUILDING (CCS BLDG).
CODE ANALYSIS
A. BUILDING CODE ANALYSIS:
TYPE OF CONSTRUCTION: V -B
OCCUPANCY TYPE: B
AUTOMATIC FIKE SPRINKLER? YES
BASIC ALLOWABLE AREA PER CBC TABLE 503: 27,000 SF
PROPOSED BUILDING AREA: G, 193 SF
B. PLUMBING FIXTURE CALCULATIONS (CPC TABLE 422. 1):
NUMBER OF OCCUPANTS PER CPC TABLE A:
G, 193 / 200 = 31 OCCUPANTS
o PLUMBING FIXTURES:
(BASED ON I G MALE * I G FEMALE OCCUPANTS)
o DRINKING FOUNTAIN:
I REQUIRED, I WATER COOLER PROVIDED
VICINITY
MALE
FEMALE
Ma.PJF'k
W.C.
URINAL
LAV
W.C.
LAV
REQUIRED
I
1
1
2
1
PROVIDED
2
0
2
2
2
o DRINKING FOUNTAIN:
I REQUIRED, I WATER COOLER PROVIDED
VICINITY
MAP
10104 Yala6rne °""`�y
Ma.PJF'k
rructaa
I
g Y'a:..-imi:
N
(: �.�JCr; nJ
$ PANAMA PARK
PLANNING 5UBMITTAL
� �md'��
a°°
'le-Icm
Jk
STRP�M6ERRY
T
17
CALVERT
D'DZ'r
LM A �IMDk
A0. I
MIMITZ
a
PRELIM REVIEW
NO
^
BY
a jW10
Ray-rtr P7ik
RANtHD
��
141 fYFRRR a41t
A I I
JGAOUIM MILLER
WEST VALLEY
ono [Gra -,
.
BIROLANO
C
lehem Pe -k l)rbfaMH05r.hnrJ T WEFT
SAN JDEE
MEiGH90AS
R��&
A 1.2
F Ad 59 Rand, t"Wl T �ry
KaY.ar Fcirnanunla Smio � Y ]rcrxt. Rarnen
Me6C91,� A2.1
.. ° i�di�iile Lcxro� A2.2
�
R
A3.1
Val wswppirc Mgt � A4.1
1
CE ✓tin2B
�y
44M4IP FMde MdO,,;
10104 Yala6rne °""`�y
Ma.PJF'k
rructaa
Y
r�IrTv
CC- W.ty
(: �.�JCr; nJ
ax.n. c.A awa 3c+a�{rsklhd
PLANNING 5UBMITTAL
Edw�•ayt on
a°°
'le-Icm
Jk
STRP�M6ERRY
T
uepot i..
CALVERT
D'DZ'r
LM A �IMDk
Q
Jdlp-pep Park
a
PRELIM REVIEW
NO
^
BY
a jW10
(K%
RANtHD
��
Mots
N�NF.FO `"p,
CmrN81tl6p9rt. FEENOONAOA
Ma.PJF'k
Q
9/7/18
r�IrTv
Q
6/29/18
PLANNING 5UBMITTAL
g
a°°
'le-Icm
Jk
STRP�M6ERRY
0
uepot i..
PARK
Q
Jdlp-pep Park
a
PRELIM REVIEW
NO
DATE
BY
DESCRIPTION
(K%
141 fYFRRR a41t
ar..l...<..
•:,,J,s,
JGAOUIM MILLER
WEST VALLEY
t:;,:n
C
lehem Pe -k l)rbfaMH05r.hnrJ T WEFT
SAN JDEE
R��&
rtrtay'
-
C}LpHiRY LANE
RAINBOW
RR{7{SKVaLF
-CHA NTF
HATHAWA
AMC gkr; ;gg�IA CAS T R 11
K6Min
,•
s
MoranPark SARI4TOGA
i
WOODS
e
SaralKaCi nk:yClub -
BROOKVIEW
N
PROJECT SITE
PARKING AN ALY5 I S
EXISTING FACILITY
USE AREA PARKING NO. OF STALLS
(SQ. FT.) RATIO NEEDED
OFFICE (NET) 4, 1 G9 1/285 15
MULTI -FAMILY 2 PER 2-15K 3G
RESIDENTIAL I PER I -BR
PARKING STALLS NEEDED 52
TOTAL PARKING STALLS PROVIDED 1 52
PROPOSED FACILITY
USE AREA PARKING NO. OF STALLS
(SQ. FT.) RATIO NEEDED
DRAWING INDEX
ARCHITECTURAL
PROJECT INFO, DRAWING INDEX, RENDERING
SITE PLAN
ENLARGED SITE PLAN
FIRST FLOOR EXISTING $ PROPOSED PLANS
SECOND FLOOR EXISTING * PROPOSED PLANS
SECTIONS $ ELEVATIONS
EXISTING PROPOSED ROOF PLANS
PROJECT DATA
1. ASSESSOR'S PARCEL NO
3. ZONING:
4. LAND USE:
5. LOT AREA:
G. FLOOK AREA (EXISTING):
7. FLOOR AREA (PROPOSED)
OFFICE (NET) 4,843 1/285 17 8. LOT COVERAGE:
9. CONSTRUCTION TYPE
MULTI -FAMILY _ 2 PER 2 -BR 3G
RESIDENTIAL I PER 1-13K
10. SETBACKS:
PARKING STALLS NEEDED 53 1 1. BUILDING HEIGHT:
TOTAL PARKING STALLS PROVIDED 1 52
BICYCLE PARKING
CCS BLDG AREA PARKING
(SQ. FT.) RATIO
G, 193
1/1,250
NO. OF STALLS NO. OF STALLS
NEEDED NEEDED
5
9
3 1 G-24-0594
HEART OF THE CITY
HEART OF THE CITY SPECIAL AREA
5 1,270 SQ FT (1. 18 ACRES)
BLDG I 3,446 SF
BLDG 2 3,444 SF
BLDG 3 9,924 SF
CCS BLDG 5,177 SF
TOTAL 2 1,993 SF -
ADDITION OF OFFICES AND
CONFERENCE ROOM ON THE 2ND
FLOOR OF THE CCS BUILDING,
APPROXIMATELY 1 ,0 IG SQ. FT.
CCS BLDG WILL BE G, 193 SF
TOTAL FLOOR AREA WILL BE
23,009 SF
%sm.
V -B
SEE DIMENSIONS ON A I. I A I .2
28' (2-5TOKY)
Rc
S @ Janice T. Yeh @
C-33243 41 •
6 Rsr. ;ate: 0713 19
ADAPTIVE
ARCHITECTURE
20111 STEVENS CREEK BLVD
SUITE 270
CUPERTINO, CA 95014
(408) 865-1089
0
CHECKED:
DATE:
SCALE: AS NOTED
Q
9/7/18
PLANNING 5UBMITTAL
Q
6/29/18
PLANNING 5UBMITTAL
0
3/23/16
PRELIM REVIEW
0
12/16/17
PLANNING MTG
Q
6/16/17
PRELIM REVIEW
NO
DATE
BY
DESCRIPTION
REVISIONS
DRAWN: JY
CHECKED:
DATE:
SCALE: AS NOTED
PROJECT NUMBER:
PROJECT INFO,
DRAWING INDEX,
& RENDERING
DRAWING �O ■
NUMBEK:
5—BIKE CAPACITY
BICYCLE RACK ON
NEW 7'X7CONC PAD
R/
Q
J
(E) PYRU5 CALLERIAN/
CHANTICLEER', TYP.
@ STREET FRONTAGE
ALL EXTERIOR STORM DRAIN INLETS ON THE PARCEL MUST BE
CLEARLY MARKED WITH "NO DUMPING FLOWS TO CREEK" OR
"NO DUMPING FLOWS TO BAY'. COORDINATE WITH ALEX
WYKOFF WITH CITY OF CUPERTINO PUBLIC WORKS
DEPARTMENT ON DRAIN INLET MARKERS.
2. A COMPLETED CONSTRUCTION AND DEMOLITION (C*D) WA5TE
MANAGEMENT PLAN MUST BE SUBMITTED AT THE TIME OF
DEMOLITION AND/OR BUILDING PERMIT ISSUANCE. IF BOTH
DEMOLITION AND CONSTRUCTION PERMITS WILL BE ISSUED,
C*D WASTE MANAGEMENT MUST BE SUBMITTED FOR EACH
PERMIT. IF THE PERMIT APPLICANT AND/OR THEIR CONTRACTOR
AND ANY SUBCONTRACTOR WORKING ON THE PROJECT
SELF -HAULS THE C*D MATERIAL, A WASTE MANAGEMENT
REPORT MUST BE SUBMITTED PRIOR TO FINAL APPROVAL OF
THE DEMOLITION / BUILDING PERMIT DEMONSTRATING A
MINIMUM OF G5% OF THE CSD WASTE HAS BEEN DIVERTED
FROM LANDFILL AND RECYCLED. PLEASE NOTE THAT C*D
DEBRIS BOX SERVICE MAY ONLY BE OBTAINED FROM
RECOLOGY, THE CITY'S FRANCHISED WASTE HAULER. CSD
RECYCLING INFORMATION AND REPORTS MAY BE
DOWNLOADED AT WWW.CUPERTINO.ORG/GREENDEV
GENERAL NOTES
5ITE PLAN I I I Gil = 11-011
N
Janice T. Yeh i
C-33243 Q
(3) Rsr. k 07/31/19
ADAPTIVE
ARCHITECTURE
20111 STEVENS CREEK BLVD
SUITE 270
CUPERTINO, CA 95014
(408) 865-1089
DRAWN:JY
CHECKED:
DATE:
SCALE: AS NOTED
A9/7/18
PLANNING 51JBMITTAL
A
G/29/18
PLANNING 5UBMITTAL
A13/23/1(5
PRELIM REVIEW
Al2/1
G/ 17
PLANNING MTG
AG/1
G1 17
PRELIM REVIEW
NO
DATE
BY
DESCRIPTION
REV1510N5
DRAWN:JY
CHECKED:
DATE:
SCALE: AS NOTED
PROJECT NUMBER:
SITE PLAN
DRAWING Al. 1
J •
JaniceT. Yeh
C-33243 g
Ren, Date: 07/31/19 = '.
�O
ADAPTIVE
ARCHITECTURE
20111 STEVENS CREEK BLVD
SUITE 270
CUPERTINO, CA 95014
(408) 865-1089
DKAWN:JY
CHECKED:
DATE:
SCALE: AS NOTED
A9/7/18
PLANNING SUBMITTAL
AG/29/1
6
PLANNING SUBMITTAL
A3/23/1(5
PRELIM REVIEW
Al2/1
G1 17
PLANNING MTG
A
G/ 16/ 17
PRELIM REVIEW
NO
DATE
BY
DESCRIPTION
REVISIONS
DKAWN:JY
CHECKED:
DATE:
SCALE: AS NOTED
PROJECT NUMBER:
ENLARGED
SITE PLAN
DRAWING A1.2
MEETING RM
MEETING RM
MEETING RM
MEETING RM
LAUNDRY
STO R.
UP
WC
LOBBY/ WAITING AREA
RESIDENTIAL
COMMON
ROOM
1011311=unl"
STO R.
WC
ELEV.
MACH.
RM
f LEV\�
/
ELEC.
ROOM
I I EXISTING WALL TO BE
1 1�� REMOVED
EXISTING GLASS BLOCK\ I
WALL AND DOOR TO BEi
REMOVED * SALVAGED k I
_ - - - - - FOOD PANTRY
[:RECEPTION DESK
I
N I N
6
A3.1
EXISTING 15T ELOOK PLAN I 11411 = 1 1-011 I 2 I PROF05ED 15T ELOOK PLAN
11411
= 1 1-011
Janice T. Yeh i
C-33243 Q
Date: 07/31 / 19
r TFGP` .
��rl OF.�:.��``��
ADAPTIVE
ARCHITECTURE
20111 STEVENS CREEK BLVD
SUITE 270
CUPERTINO, CA 95014
(408) 865-1089
DRAWN:JY
CHECKED:
DATE:
SCALE: AS NOTED
A9/7/18
PLANNING 5UBMITTAL
A
6/29/18
PLANNING 5UBMITTAL
A3/23/16
PRELIM REVIEW
Al2/1
G/ 17
PLANNING MTG
Q
6/16/17
PRELIM REVIEW
NO
DATE
BY
DESCRIPTION
REVISIONS
DRAWN:JY
CHECKED:
DATE:
SCALE: AS NOTED
PROJECT NUMBER:
FIRST FLOOR
EXISTING &
ROPOSED PLANS
NUBE� A2.1
EX 1 ST I N G 2ND E LOOK PLAN I 11411 = 1'-o" � 2
2'-G" X 2'-G" WINDOW,
45 -MIN. FIRE RATED.
TYP. OF (4)
OFFICE I
95 5Q.FT.
Cl
OFFICE 2
95 5Q.FT.
63, 4
24'- 10" A3.1 A3.1
I
COUNTER 1
IL` �---
1 11-311
OFFICE 3
95 5Q.FT.
co
u'-511
1'-0" MIN.
WC (E)
r - - - - -
�
I I
I
� I
I
I
NEW
GLA55
PARTITION
OFFICE 4
89 5Q. FT.
I' -G" MIN.'
5'-2"
I
7Io,,'-MINI
STORAGE
WC (E)
®I
<D4V '�<�>
3 4 A
5 G
OPEN
OFFICE
7 8
• i
6
A3.1
I -HR FIRE RATED
EXTERIOR WALL
4'-3i"
2
1 •
OFFICE 5 (E)
OFFICE G (E)
OFFICE 7 (E)
PROPOSED 2ND ELOOK PLAN
STAFF
LUNCHROOM (E) 5
A3.1
N
11411 = 1 1-011 I I
Rc
Janice T. Yeh
C-33243 Q
Qs, Ren. Date: 07/31/19
r TFOfGP.
ADAPTIVE
ARCHITECTURE
20111 STEVENS CREEK BLVD
SUITE 270
CUPERTINO, CA 95014
(408) 865-1089
0
CHECKED:
DATE:
SCALE: AS NOTED
A9/7/18
PLANNING 5UBMITTAL
A
6/29/18
PLANNING 5UBMITTAL
3/23/16
PRELIM REVIEW
12/16/17
PLANNING MTG
Q
6/16/17
PRELIM REVIEW
NO
DATE
BY
DESCRIPTION
REV1510N5
DRAWN:JY
CHECKED:
DATE:
SCALE: AS NOTED
PROJECT NUMBER:
SECOND FLOOR
EXISTING &
PROPOSED PLANS
NUBE� A2.2
: J '
Janice T. Yeh
C-33243
ADAPTIVE
ARCHITECTURE
20111 STEVENS CREEK BLVD
SUITE 270
CUPERTINO, CA 95014
(408) 865-1089
D
CHECKED:
DATE:
SCALE: AS NOTED
Q
9/7/18
PLANNING SUBMITTAL
COMPOSITION HORIZONTAL WOOD
VERTICAL WOOD SIDING
PLANNING 50MITTAL
3/23/16
PRELIM REVIEW
12/16/17
PLANNING MTG
SHINGLE ROOF TO SIDING TO MATCH (E)
TO MATCH (E)
PRELIM REVIEW
NO
DATE
BY
DESCRIPTION
REVISIONS
MATCH (E)
i
2ND FLOOR ADDITION
— TOP OF ROOF +27-'G 12"
TOP OF ROOF +27-'6 12"
I
I
—
C.0
❑
❑ ❑
❑ ❑
—SECOND FLOOR CEILING + 19'-5 /2"
co
1
I
—SECOND FLOOR CEILING + 19'-5 /2"
jI�
-
-LEI
1Co
I
CV
SECOND FLOOR+1 1' 5 1/2"
N
1 M
— — — — — — — — — — — — — —
SECOND FLOOR+I I'-5
— FIRST FLOOR CEILING +9'-0"
oji—
FIRST FLOOR CEILING +9'-0
�o
�oM]F
— FIRST FI nnR+01-nll'11
— FIRST FI QQR-4-mn" i,
(N) ROOF BRACKET (N) WOOD TRELLIS (N) ROOF BRACKET (E) ROOF BRACKET
TO MATCH (E) TO MATCH (E) TO MATCH (E)
WEST
ELEVATION
- EXISTING
1/811 = 11.011
2
WEST ELEVATION - PROPOSED
1/811 = 11.011
WINDOW SIZE TO
HORIZONTAL WOOD
MATCH (E), W/ VERTICAL WOOD
SIDING
TO MATCH (E)
45 -MIN FIRE RATING SIDING TO MATCH (E)
—
—
— —
TOP OF ROOF +27-' G 12"
�
2ND FLOOR AD ITION
— —
TOP OF ROOF +27-'G
f
�7l
I
I
r
I�
x
— SECOND FLOOR CEILING + 19'-5 I/2"
1
— SECOND FLOOR CEILING + 19'-5
1
,\A _o
SIJ
00
CV
—
— —
SECOND FLOOR+1 I'-5 1/2"
ti —
CV
— I
r
SECOND FLOOR+1 I'-5 I/2"
.1- ..
I �
—
FIRST FLOOR CEILING +9'-0"
— — — — — — — — — — — — — — — — — —
FIRST FLOOR CEILING +9'-O"
i
N
El
El
El
-
-
x• �d
I I�
QQRnll
Fi
—
—FIRI
(E) WOOD
TRELLIS
(E) WOOD TRELLIS TO (N) ROOF BRACKET
I -
REMAIN TO MATCH (E)
ALLOWABLE OPENING CALCULATION:
vrt
I -HK RATED WALL AREA = G40 SF
OPENING AREA = 25 (WDWS) + 21
(DOOR) = 4G SF
4G / G40 = 7% <25% OF WALL
NORTH ELEVATION
- EXISTING
1/811
= 11-011
4
NORTH ELEVATION - PROPOSED
1/611 = 11-011
3
EXISTING NORTH WEST CORNER
— TCF CF POOF +27-G 1/2'
,
CO
SECOND FLOOR CEILING + 15-5 /2'
I
`R ■ +
OPEN OFFICE
WC
STORAGE
BOARD ROOM
'f .
� OFFICE 2 �%/Z-
WC
INCWC
Oo LUNCh
ROOM
--— — — — — —-
1 �
N j /
W
LL(J)
N
— FIR5T FLOOR CFl
y I iw
{
'
I
-
r
1 ..f
— FIRST r1 nc-)R+n'
EAST
-WEST
SECTION
1/811
= 11-011
6
NORTH -SOUTH SECTION
1/811 = 11-011
5
EXISTING
WEST ELEVATION
: J '
Janice T. Yeh
C-33243
ADAPTIVE
ARCHITECTURE
20111 STEVENS CREEK BLVD
SUITE 270
CUPERTINO, CA 95014
(408) 865-1089
D
CHECKED:
DATE:
SCALE: AS NOTED
Q
9/7/18
PLANNING SUBMITTAL
6/29/18
PLANNING 50MITTAL
3/23/16
PRELIM REVIEW
12/16/17
PLANNING MTG
Q
6/16/17
PRELIM REVIEW
NO
DATE
BY
DESCRIPTION
REVISIONS
DKAWN:JY
CHECKED:
DATE:
SCALE: AS NOTED
PROJECT NUMBER:
SECTIONS &
ELEVATIONS
DRAWING �� ■
NUMBER:
FACE OF BUILDING BELOW
ROOF DEMOLITION PLAN I imil = I1-011 I 2
E
I R
Will -
L �
FACE OF BUILDING
(E) SLOPE (E) SLOPE
4 4.4
4'
EXISTING COMPOSITION
SHINGLES ROOF
+Ell
(E) SLOPE (E) SLOPE
I
EXISTING ROOF BELOW
I
N
PROPOSED ROOT= FLAN I imil = 11-011
AR
Janice T. Yeh
C-33243 g
Ren, Date: 07/31/19Of
c
ADAPTIVE
ARCHITECTURE
20111 STEVENS CREEK BLVD
SUITE 270
CUPERTINO, CA 95014
(408) 865-1089
DKAWN:JY
CHECKED:
DATE:
SCALE: AS NOTED
A9/7/18
PLANNING SUBMITTAL
AG/29/1
6
PLANNING 50MITTAL
A13/23/1(5
PKELI M REVIEW
Al
211 G1 17
PLANNING MTG
Aro/
16/ 17
PRELIM KEVI EW
NO
DATE
BY
DESCRIPTION
REVISIONS
DKAWN:JY
CHECKED:
DATE:
SCALE: AS NOTED
PROJECT NUMBER:
EXISTING &
PROPOSED
ROOF PLANS
B'E A4.1
HEXAGON TPANSPOPTATION CONSULTANTS, IN(.
May 15, 2018
Ms. Ellen Yau
City of Cupertino
10300 Torre Avenue
Cupertino, CA 95014
Re: Parking Study for West Valley Community Services
Dear Ms. Yau:
Hexagon Transportation Consultants, Inc. has completed a parking study for the proposed
expansion of the West Valley Community Services (WVCS) building at 10104 Vista Drive. We
understand that WVCS wishes to expand the building area by about 1,000 s.f. but does not
propose to change any existing programs. Therefore, it is not expected that the building
expansion would change the existing parking situation. The purpose of the parking study was to
determine whether the current parking supply is adequate to meet the demand or whether the
current supply is over -utilized. There are also roughly 5 street parking spaces directly adjacent to
the site on Vista Drive (see Figure 1).
Project Description
WVCS has 24 residential units and an office/food pantry on the site. The food pantry is available
for clients to come and get food once per week. Clients may drive, take transit, walk, or bike to the
site. According to WVCS, only about 20% of clients drive to the site. Also, according to WVCS,
the large majority of food pantry clients come in the morning.
The office/pantry and residential units share 52 on-site parking spaces. The office/food pantry is
open 8 AM to 5 PM on weekdays (Tuesdays until 8 PM), so it doesn't utilize any parking spaces
on weekends.
In order to facilitate shared parking on the site between residents and office/food pantry users,
WVCS has implemented a system of cones. If residents leave in the morning but will return later
before noon, they can reserve their parking space by placing a cone at the entrance. If they will
not be back before noon, they are instructed to leave their space open so that it can be used by
someone else while they are gone.
Parking Counts
Hexagon counted the parking utilization at the site on three typical weekdays (April 23-25, 2018)
during the hours of 8 AM to 5 PM. Table 1 shows that the highest parking demand was found to
occur Tuesday at 2:30 PM when 36 spaces were occupied plus one coned -off space. That left 15
vacant spaces on-site.
4 North Second Street, Suite 400 • San Jose, California 95113 • phone 408.971.6100 • fax 408.971.6102 • www.hextrans.com
Ms. Ellen Yau
May 15, 2018
" Page 2 of 3
Table 1
Parking Occupancy —April 23-25-2018
Monday April 23rd Tuesday April 24th Wednesday April 25th
Lot
Lot
Blocked
8:00 AM
29
0
8:30 AM
30
0
9:00 AM
30
0
9:30 AM
32
0
10:00 AM
34
0
10:30 AM
32
0
11:00 AM
30
0
11:30 AM
31
0
12:00 PM
26
0
12:30 PM
24
1
1:00 PM
32
1
1:30 PM
33
1
2:00 PM
33
1
2:30 PM
34
1
3:00 PM
32
0
3:30 PM
29
0
4:00 PM
26
0
4:30 PM
27
0
5:00 PM
27
0
Lot
Blocked
8:00 AM
24
1
8:30 AM
22
2
9:00 AM
22
2
9:30 AM
28
2
10:00 AM
31
2
10:30 AM
30
2
11:00 AM
32
2
11:30 AM
31
3
12:00 PM
29
3
12:30 PM
30
2
1:00 PM
34
2
1:30 PM
34
2
2:00 PM
36
1
2:30 PM
36
1
3:00 PM
33
1
3:30 PM
33
1
4:00 PM
32
1
4:30 PM
32
1
5:00 PM
31
1
Lot
Blocked
8:00 AM
21
1
8:30 AM
20
1
9:00 AM
21
1
9:30 AM
21
2
10:00 AM
28
2
10:30 AM
30
2
11:00 AM
28
2
11:30 AM
22
1
12:00 PM
24
1
12:30 PM
20
1
1:00 PM
21
0
1:30 PM
23
0
2:00 PM
24
1
2:30 PM
22
1
3:00 PM
21
1
3:30 PM
24
0
4:00 PM
23
0
4:30 PM
22
0
5:00 PM
21
0
Ms. Ellen Yau
May 15, 2018
" Page 3 of 3
Conclusions
WVCS is not presently over -utilizing their parking supply. At all times during the parking counts,
there were vacant spaces available on-site and on the street. The addition of 1,000 square feet to
the food pantry building, without increasing services, would not result in a parking problem.
We appreciate the opportunity to provide this parking study. If you have any questions, please do
not hesitate to call.
Sincerely,
HEXAGON TRANSPORTATION CONSULTANTS, INC.
Gary K. Black, AICP
President
Parking Study for West Valley Community Services
Legend
= Parking Count Areas
.� HEXAGON
r
i
r - �
_
qIM
S
n_
Figure 1
Parking Count Areas
NORTH
Nam scale
HEALTHMME
• HOME • H E A R T
West Valley Community Services
February 20, 2018
VISTA VILLAGE
PARKING MANAGEMENT PLAN NOTICE
Dear Vista Village Residents,
In order to manage Vista Village traffic and parking efficiently, WVCS will be
implementing new parking management policies and procedures.
Our goal is for the Vista Village residents, employees, clients, and volunteers to use our
parking lot efficiently and effectively.
Beginning March 5, 2018, tenants will be sharing vacant unoccupied, covered spaces
ONLY from Monday -Friday between the hours of 8am — 12pm. The plan is as follows:
• West Valley Community Services will issue a large GREEN cone to each
Vista Village unit. The cone will remain in your covered parking spot next to
the spots cement bumper.
• Tenants who will be away from Vista Village and not using their covered
parking spot between 8am and 12pm should leave the cone next to the cement
bumper. This will signify that the spot is available for use.
• Tenants that intend to use their parking spot between 8am and 12pm should
place the green cone at the entrance point to the parking spot.
• If the cone is removed or missing from your parking space, it means that the
spot is open and available to use between 8am and 12pm, Monday through
Friday.
West Valley Community Services employees will periodically walk the parking lot to
ensure that tenants are following the parking management plan.
Should you have any questions, please feel free to contact us at 408-956-6112.
We thank you in advance for your cooperation.
WVCS Management
Q
Cd
HEALTHMME
• HOME • H E A R T
West Valley Community Services
SAMPLE
If you will be away from Vista Village between
Sam and 12pm, leave the cone next to the cement
bumper
If you will be using your parking spot between
Sam and 12pm, place the cone at the entrance to
your parking spot.
EXHIBIT 1
0
0
Away between Sam-12pm EAway Return betweenam-12pm