Loading...
HomeMy WebLinkAboutAH Packet 9-27-2018CITY OF CUPERTINO AGENDA C U P E RT I N O ADMINISTRATIVE HEARING 10300 Torre Avenue, City Hall Conference Room C Thursday, September 27, 2018 5:00 PM ROLL CALL APPROVAL OF MINUTES 1. Subject: Draft Minutes of August 9, 2018 Recommended Action: approve or modify the Draft Minutes of August 9, 2018 Draft Minutes of August 9, 2018 ORAL COMMUNICATIONS This portion of the meeting is reserved for persons wishing to address the members on any matter not on the agenda. Speakers are limited to three (3) minutes. In most cases, State law will prohibit the members from making any decisions with respect to a matter not listed on the agenda WRITTEN COMMUNICATIONS PUBLIC MEETINGS 2. Subject: Architectural and Site Approval to consider allowing a 1,161 square foot first floor and 326 square feet second floor addition to an existing duplex; (Application No.: ASA -2017-06; Applicant: Susan Chen; Location 22861 Medina Lane; APN No.(s): 342-30-013) Recommended Action: That the Hearing Officer adopt the draft resolution to: 1. Find that the project is exempt from CEQA; and 2. Approve the Architectural and Site application Administrative Hearing Officer's decision final unless appealed Staff Report 1 - Draft Resolution for ASA -2017-06 2 - Plan Set 3 - Public Comment 3. Subject: Development Permit and Architecural and Site approval to consider Page 1 Administrative Hearing AGENDA September 27, 2018 allowing a 1,016 square foot second floor addition to an existing office building. Application No(s).: DP -2018-06, ASA -2018-07; Applicant(s): West Valley Community Services (Santa Clara County Fire Protection District); Location: 10104 Vista Drive APN# 316-24-059 Recommended Action: That the Hearing Officer adopts the draft resolutions to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve the Development Permit (DP -2018-06) and Architectural and Site Approval (ASA -2018-07) Administrative Hearing Officer's decision final unless appealed Staff Report 1 - Draft Resolution for DP -2018-06 2 - Draft Resolution for ASA -2018-07 3 - Plan Set 4 - Parking Study 5 - Vista Village Parking Management Plan OLD BUSINESS NEW BUSINESS STAFF AND COMMITTEE REPORTS ADJOURNMENT Page 2 Administrative Hearing AGENDA September 27, 2018 In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend the next meeting who is visually or hearing impaired or has any disability that needs special assistance should call the City Clerk's Office at 408-777-3223, 48 hours in advance of the meeting to arrange for assistance. Upon request, in advance, by a person with a disability, meeting agendas and writings distributed for the meeting that are public records will be made available in the appropriate alternative format. Also upon request, in advance, an assistive listening device can be made available for use during the meeting. Any writings or documents provided to a majority of the members after publication of the agenda will be made available for public inspection. Please contact the City Clerk's Office in City Hall located at 10300 Torre Avenue during normal business hours. IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal Code 2.08. 100 written communications sent to the Cupertino City Council, Commissioners or City staff concerning a matter on the agenda are included as supplemental material to the agendized item. These written communications are accessible to the public through the City's website and kept in packet archives. You are hereby admonished not to include any personal or private information in written communications to the City that you do not wish to make public; doing so shall constitute a waiver of any privacy rights you may have on the information provided to the City. Members of the public are entitled to address the members concerning any item that is described in the notice or agenda for this meeting, before or during consideration of that item. If you wish to address the members on any other item not on the agenda, you may do so during the public comment. Page 3 Cupertino, CA 95014 (408) 777-3308 ACTION MINUTES OF THE REGULAR MEETING OF THE ADMINISTRATIVE HEARING HELD ON August 9, 2018 ROLL CALL Hearing Officer present: Benjamin Fu, Assistant Director of Community Development Staff present: Gian Martire, Associate Planner Catarina Kidd, Senior Planner Applicant(s) present: Jane Lau, property owner 10550 Bette Ave Bernard Baker, Project Manager for Tantau 14 Rebecca Tolentino, Planning Manager, Apple Inc. Chris Grimmer, Landscape Architect, Apple Inc. APPROVAL OF MINUTES: 1. April 12, 2018 The minutes of April 12, 2018 were approved as written POSTPONEMENTS/REMOVAL FROM CALENDAR: None ORAL COMMUNICATIONS: None WRITTEN COMMUNICATIONS: None PUBLIC MEETING ITEMS: 2. Application No. (s): R-2018-20, INT -2018-01 Applicant: Clayton Johnson (Lau residence) Location: 10550 Bette Ave APN#(s): 369-26-016 Front Yard Interpretation to designate the property line along Bette Avenue as the front lot line to allow for a 198 square foot addition to the first floor and a Two Story Permit to allow a 980 square foot second floor to an existing single -story residence. Administrative Hearing decision final unless appealed. 2 Administrative Hearing August 9, 2018 Staff Member Martire addressed the Hearing Officer. The subject lot is a corner lot. The current Municipal Code calls for the shorter lot line of a corner parcel to be designated as the front yard. This has caused many of the older housing developments to be non-compliant with regard to front and side yard setbacks. The City has allowed Interpretations for front yard definitions for corner lot homes where it can be shown that other corner lots have the same configuration. Half of the homes (situated on a corner) in the neighborhood have a similar layout. The applicant would like to add square footage to the first floor and add a second floor to the existing residence. The additional square footage would not be allowed without a determination to show the longer lot side as the front yard. Staff has worked with the applicant for several months to develop a design that meets the current setback requirements should the Interpretation be granted. One window on the east side of the proposed new second floor will be required to have privacy tree planting. The neighbor requested a different of tree species be planted and would like to have the window sill raised 5 feet. The Hearing Officer asked for clarification of how this lot is compatible with the neighborhood. Staff member Martire stated that half of the homes along Glenview Avenue have the same lot configuration as proposed. This allows more light and air for the homes along Bette Avenue that they otherwise wouldn't have. The Hearing Officer confirmed the location of the easterly neighbor asking for the window revision. He then asked if the property owner would like to make a statement. The property owner, Jane Lau, told the Hearing Officer that she was redesigning her home to make it more comfortable to raising her family in. The Hearing Officer opened the public comment period. David Herbert, 6693 Clifford Dr (property owner to the south) - He feels that the setback encroachments make the structure too close to his home and will reduce his property value. Elisa Herbert, 6693 Clifford Dr - She also feels that the encroachment of the addition and the second story are too close to their house. The backyard privacy has been diminished. She would like for the tree in the back yard remain to protect privacy. Jennifer Griffin, a Cupertino resident - she asked if the front yard is determined to be on another side of the house, does the house address have to change? Kitty Moore, a Cupertino resident - asked for clarification of the second floor setback is, what the elevation of the first floor is and what the other structures on the site are The Hearing Officer closed the comment period. Staff member Martire said that there is a pool in what is currently the side yard (per definition). The pool will remain. The second story setback is 25 feet from the eastern property line. This is consistent with how the City prescribes second story setbacks. It is also 20 feet from the southern property line. The first floor is between 9 and 10 feet high. The Hearing Officer asked if the Zoning Code contained any reference to property values or visibility. Staff member Martire stated that is does not. The Hearing Officer clarified that the house address is at the functional front of the house which is physically the side of the house and that the house has been in its current orientation (usability) for 30 years or more. He clarified that the 3 Administrative Hearing August 9, 2018 addition is not going to be encroaching on existing open spaces. The Hearing Officer referred to emails that were received by Staff and included in the packet. Staff member Martire confirmed that they were from the neighbors on the east side of the subject property. The Hearing Officer stated for the speakers that for these types of projects the Code is very clear about what the property owner can and cannot do in terms of encroachment setback. In reviewing the prosed project, Staff evaluated what the impacts to neighboring properties could be and the overall affect in the neighborhood. They look at the impacts to the existing properties as well as the reasonable and literal functionality of the subject property. They cannot take into consideration perceived impacts to visibility, privacy and house values. He noted that changing the current configuration of the home will still provide adequate separation per the Municipal Code. The setbacks and lot coverage requirements are being met. The development lot coverage is being increased from 32% to 35% and is in conformity with the other homes in the neighborhood. The Hearing Officer approved the findings on the Staff report. DECISION: The application was approved by the Hearing Officer per the draft resolutions. 3. Application No. (s): ASA -2018-08, EA -2018-05 Applicant: Bernard Baker (Apple, Inc) Location: 19020 Pruneridge Ave APN#(s): 316-06-063 Architectural and Site Approval to consider a proposed 85,247 square foot office building including revisions to the parking structure, from above grade to below grade, for a previously approved office, research and development campus (Apple Park Phase 2-Tantau 14). Administrative Hearing decision final unless appealed. Staff member Kidd addressed the Hearing Officer. The project is part of Phase II of the approved Apple Campus. This phase of the construction project is called Tantau 14. The Apple Campus was originally approved in 2013. This project is being heard by the Administrative Hearing Officer as the proposed changes to the original development approval are a reduction in the scale of the project, change the parking from above ground to below ground and the addition of a green roof. The Hearing Officer asked for clarification of how the proposed changes to the originally approved development application are still in conformity. Staff member Kidd explained that the development agreement master plan covers Phase I of the new campus included the main campus building, the garage and associated amenity buildings. The Phase II portion of the original development agreement includes all the buildings on Tantau, the visitor center, R & D building and the office building, which is the subject of the hearing today. The development agreement specified square footage, parking spaces, height limits, the amount of staffing and the landscaping plans. As the development has evolved over the years, necessary minor adjustments have come up. She stated that the proposed project is still in conformity in that the changes are at or are less than the original 4 Administrative Hearing August 9, 2018 allowances. She referred to a chart in her staff report. The office space is a little less, the amenity space is a little more, and the allocated number of parking spaces is the same, just being broken up into above and below ground locations. The Hearing Officer opened the public comment period. Kitty Moore, a neighbor of the project - asked what the new Apple Park building, employee and parking totals are. She also wanted all of the EIR addendums added to the Apple webpage. Milt Kosner, a neighbor of the project - spoke in favor of the underground parking and retaining the concrete walls by his house. He wanted to make sure that the new tree species being planted wouldn't interfere with power lines. He wanted to know when the estimated end date of construction is. He wanted to know that Apple is constructing the building to the highest earthquake standards and when Apple was going to be repairing the damage from the construction vibrations to the homes near the visitor center was going to be done. Pat Robbins, a neighbor of the project - listed several concerns regarding the Apple campus operations: late hours, street sweeping, residential sound wall, smoking in the right of way. Specific to the project, he wants to see better parking management. Employees and contractors are parking in the neighborhoods around the visitor center. Michael Stout, a neighbor of the project - was concerned about the deep excavation that would be necessary for underground parking. There is current damage being done to homes in the area from construction vibrations now. This will only continue with this proposal. Underground parking is preferred, but the construction is a concern. He also expressed the need for earthquake preparedness for an underground garage. Rob Wagner, a neighbor of the project - emailed his comments earlier and brought a copy of it with him to give to staff. Jennifer Griffin, a neighbor of the project - wanted to know if this building construction was the last of the construction. She also wanted to know how the dirt was going to be removed from the site and how traffic around the site was going to be managed. The Hearing Officer reviewed all of the concerns the speakers for the applicant. Most of the concerns are related to the Apple Campus construction project as a whole rather than Tantau 14 specifically. He asked the applicant to address these questions. The applicant, Bernard Baker, Apple Real Estate Development, addressed the Hearing Officer and the speakers. He said the current completion date is the summer of 2020. The dirt removal will be hauled according to the traffic management plan needed as one of the conditions of approval for the project. They have a different street sweeping company than they have used in the past. He hopes that they are more effective. This project should have less lane closure occurrences than the larger project did. The neighbor fence along the side of the property between Apple and the 27 residences was a project his predecessor had worked on. He said that there had not been consensus with the neighbors regarding the new fence, so the project to build a new fence has not moved forward. He recently spoke to the landscape architect, Chris Grimmer. Cedar trees have been proposed as they will provide a nice visual screen. They will be planting approximately 80 new trees and will confirm their growth rate and will 5 Administrative Hearing August 9, 2018 be maintaining them. He wasn't sure about the current parking space count, but was confident that Apple, Inc. would be maintaining/retaining the originally approved space count allotted for employees. The number of construction workers for this phase of the project is significantly less and they should be using designated parking. Any complaints about contractors parking will be forwarded to the Construction Manager. The buildings are constructed to Building Code, including earthquake ready requirements. Not being a structural engineer, he could not attest to anything else. Apple prides itself on high quality work and the buildings are being built to code or above. All of the buildings have low -glare paint treatments, the lights have been adjusted to reduce or eliminate night time light pollution and the rooftop mechanical equipment is all being screened. Apple is installing glass film on the windows for additional privacy for its employees and screening for the neighbors. There is a creekside easement that the Water District controls, but a cooperative agreement is in place regarding the trees in that area. The Hearing Officer asked staff about the building permitting process. She stated that the Building Official meets on a weekly basis with the Apple construction team to discuss required permits and code standards. This weekly dialog goes over construction standards, complaints/concerns and enforcement. This team has been working together for years and works well together. Conversations have occurred between Apple and individual homeowners regarding property damage. Those conversations will continue. The Hearing Officer closed the comment period. The Hearing Officer thanked everyone for coming and for participating in the meeting. The Hearing Officer thanked the Apple representative for attending the meeting and being available to answer questions. The Hearing Officer supports the project and concurs that the proposed modifications fall within the original approval of the development agreement. DECISION: The application was approved by the Hearing Officer per the draft resolutions. ADJOURNMENT Respectfully submitted: /s/Beth Ebben Beth Ebben Deputy Board Clerk CUPERTINO Subject OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE A V EN U E • CU PERTI N O, CA 95014-3255 (408) 777-3308 • FAX (408) 777-3333 • planningaupertino.orq ADMINISTRATIVE HEARING STAFF REPORT Agenda Date: September 27, 2018 Architectural and Ste Approval to consider allowing a 1,161 square foot first floor and 326 square feet second floor addition to an existing duplex; (Application No.: ASA -2017- 06; Applicant: Susan Chen; Location 22861 Medina Lane; APN(s): 342-30-013) Recommended Action That the Hearing Officer adopt thedraft resolution to: 1. Approve the Architectural and S1teApproval application (Attachment 1.) Discussion Project Data: General Plan Planning Area Inspiration Heights Neighborhood General Plan Designation Low Density / Medium Density (5-10 DU/Ac.) Zoning Designation R2-4.25 Existing Proposed Density: 8 DU/acre 8 DU/acre (no change) Net Lot Area 10,937 square feet (0.25 acres) Site Development Allowed/Required Existing Proposed 2'804 sf ° Lot Coverage (max 40%) 4,375 sf 3,862 sf 35.3% ( ) (25.6%) 1st Floor Setbacks Front 20' 15'10" No Change Rear (greater of 20' or 20% of 20' 22'10" 18'6" the lot depth) Required useable rear yard if proposed rear setback < 20 113'4" x 20' = 2,266 feet but no less than 10 feet sq ft - 2,455 sq. ft. (greater of 850 sq. ft. or 20 times lot width) ASA -2017-06 22861 Medina Lane September 27, 2018 Page 2 of 6 Site Development Allowed/Required Existing Proposed Side: (20% of lot width measured at front setback line and no side less than sixfeet) 23' combined and no side less than six feet Left: 22'1" No change Right: 11'1" Right: 8'0" 2nd Floor Setbacks Front 20' 19,101, No change Rear: (20% of lot depth) 20' 45'4" 24'11 " Side: (At least three feet more than first floor setback) Left: 22'11 " +3'= 25'11 " Left: 58'11 No change Right: 8'+3' =11' Right: 11'1" Right: 20'11" Total Building Height 28' 23'4" No change Consistency General Plan Yes Zoning Yes Background: Site Description The applicant, Susan Chen, representing the property owner, Haisong Gu, is proposing a first and second floor addition to an existing duplex (see plan set —Attachment 2). The 10,937 square foot flag -lot is located at the r intersection of Medina > Lane and EI Prado Way. Theneighboring usesare residential and open space. To the north of the property is development *• consisting of attached townhomes. To the east and south of the property along Medina ` Lane and EI Pardo Way are other duplexes. r Directly west of the i property is a private open space parcel d associated with a residential planned development. ASA -2017-06 22861 Medina Lane September 27, 2018 Page 3 of 6 Currently, the existing two -unit duplex has an a total area of 3,544 square feet with one unit measuring 1,625squarefeet and asecond unit measuring 922squarefeet. Theduplex includes an 871 square foot garage and 136 square feet of storage area. Analysis: Conformance with General Plan and Zoning The proposed project is consistent with the General Plan Land Use Designation of Low/Medium Density (5-10 unitstacre) which allows a maximum of two (2) dwelling units based on the net lot area, and zoning designation of Residential Duplex (R-2) zone. Architectural and Site Approval The project will add 1,487 square feet on both floors of an existing two-story duplex. The floor area of the smal ler unit w i I I increase from 922 square feet to 2,409 square feet, with 1,161 square feet added to the first floor and 326 square feet added as second floor loft. The lot coverage on site wiII increase from 25.6% to 35.3% and the floor area wiII increase from 32.5% to 44.8%. Access to this unit will continue to be provided via an existing exterior staircase located on theeastern elevation. In addition, the applicant proposes a new entry feature between the duplexes. No changes are proposed to the parking on site. Duplex properties are required to provide three (3) parking spaces per dwelling unit (1.5 open and 1.5 enclosed.) In this instance, the project continues to meet this requirement by provided three (3) parking spaces within theexisting garage, and three (3) exterior parking spacesfor atotal of six (6). The arch itectu re and material of theproposed addition aredesigned to match theexisting home. Thishasbeen accomplished by maintaining asimilar building form, roof lines, and window treatments. Additionally, exterior finishesof theaddition will beconsistent with regard to stucco, roofing material, and windows. Theaddition will not change the overall height of the existing two-story duplex. The applicant also proposesto make certain site improvements such asthe addition of a new hot tub on the northwest corner of the property and a new paver walkway located adjacent to the rear of the buildings. Geologic Hazard Zone The property is located with a Fault Rupture Zone. Consistent with the City's requirements, a Geotechnical Report was submitted to the City for review. The report was peer reviewed by the City's Geotechnical Consultant who made recommendations ASA -2017-06 22861 Medina Lane September 27, 2018 Page 4 of 6 to ensure geotechnical safety for the proposed project. These have been incorporated as conditions of approval. Other Department/Agency Review The City's Public Works Department and Building Division have reviewed the project and have no objections. Their conditions have been incorporated as conditions of approval in the draft resolution. Public Noticing and Outreach The following table i s a brief summary of the noticing done for this project: Notice of Public Meeting, Site Signage, & Legal Ad Agenda ■ One site sign posted on the site (at least 10 days ■ Posted on the City's official prior to hearing) notice bulletin board (one ■ Legal ad p I aced in the newspaper (at least 10 week prior to hearing) days prior to hearing) ■ Posted on the City of ■ 11 notices mailed to adjacent property owners Cupertino's Web site (one (10 days prior to hearing) week prior to hearing) As of the production of this report, staff has received comments from two neighboring residents — one written (see Attachment 3) and one verbal. Their concerns and Staff responses are summarized below: ■ Construction activities (specifically noise) will be an impact to the neighboring residents. Cupertino Municipal Code(CMC) Chapter 10.48 Community Noise Control limitsthe hours of construction activities. CMC Section 10.48.053 restricts the amount of noise that may be generated by construction. Any violation of the City's ordinance would be considered a code violation and subject to enforcement by the City's Code Enforcement Division. ■ HVAC System may create unwanted noise. CMC Chapter 10.48: Community Noise Control limits the amount of noise that is allowed to be generated. For residential areas, the maximum noise level at the complaint site is 50 dBA in the nighttime and 60 dBA in the daytime. Any HVAC system installed is required to meet these requirement. Failure to be consistent with the City's ordinance would be considered a code violation and subject to enforcement by the City's Code Enforcement Division. ■ The project will create privacy impacts. The project proposes the addition of 326 square feet to an existing second story with windows with sills at four (4) feet above the ground floor. The City's Municipal Code does not require properties zoned ASA -2017-06 22861 Medina Lane September 27, 2018 Page 5 of 6 Residential Duplex (R-2) to implement privacy mitigation measures; therefore, no privacy mitigation measures have been required forthisproject. However, views into adjacent properties are currently obscured by existing cypress trees on the project site, and existing treeson theadjacent properties. It should benoted that there are existing two-story townhomes (with rear windows overlooking the subject property) along the northern property line whose views are similarly obscured by theexisting trees. ■ Concerns over a change of the fence. The appl icant has not proposed any changes to the existing fence. Any changeto thefencewill require additional Planning review. ■ Concerns over impacts on views of open space. The City's Municipal Code does not require projectson Residential Duplex Zoned (R-2) propertiesto prevent impactstoviewsfor adjacent properties. Permit Streamlining Act: This matter is adjudicatory and is subject to the Permit Streamlining Act (Government Code Section 65920 — 65964). The City has complied with the deadlines found in the Permit Streamlining Act. Deemed Incomplete: January 16, 2017, May 30, 2017, October 2, 2017, January 16, 2017 March 28, 2018, and July 16, 2018 Deemed Complete: August 16, 2018 The City had 60 days, until, October 15, 2018 to make a decision on the project. Environmental Review This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15301(e)—Existing Facilities because the exemption appliestothe addition of up to 10,000sq.ft. in an areawhereall publicservices and faci I ities are avai lableto allow for maximum development permissible in the General Plan and the project isnot located in an environmentally sensitive area. Conclusion: Staff recommends approval of the Architectural and Site Approval because the project is consistent with the General Plan and zoning ordinance, in accordancewith Chapter 19.32. Next Steps: The Hearing Officer's decision on thisproject isfinal unlessappealed within 14calendar days of the decision. ASA -2017-06 22861 Medina Lane September 27, 2018 Page 6 of 6 Prepared by- Erick Serrano, Associate Planner Reviewed and Approved by: Piu Ghosh, Principal Planner Attachments 1 — Draft Resolution for ASA -2017-06 2 - Plan Set 3—Public Comment CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 Draft Resolution OFTHEADMINISTRATIVE HEARING MEETING OFTHE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITEAPPROVAL APPLICTION FOR 1,487 SQUARE FOOT ADDITION TO AN EXISTING DUPLEX SECTION I: PROJECT DESCRIPTION Application No.: ASA -2017-06 Applicant: Susan Chen (SC Design Group) Location: 22861 Medina Lane APN: 342-30-013 SECTION I I : FINDINGS WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an application to allow an Architectural and Site approval of a 1,487 square foot addition to an existing single- story duplex located on property zoned R-3; WH EREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting in regard to the application; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds: 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The applicant is proposing an addition of 1,487 square feet to an existing duplex. The addition is designed to visually match the current structure and will be consistent to the form and land use of surrounding properties. This has been accomplished by maintaining a similar building form, roof lines, and window treatments. Additionally, exterior finishes of the addition will be consistent with regard to stucco, roofing material, and windows. Therefore, the project is not detrimental to the public health, safety, general welfare or convenience. Draft Resolution ASA -2017-06 September 27, 2018 Page 2 2. The proposal is consistent with the purposes of Chapter 19.168, Architectural and Site Review, of the Cupertino Municipal Code, the General Plan, any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision mapsor other entitlementsto usewhich regulatethe subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings; The addition will avoid any abrupt changes to the scale of the structures on-site and on adjacent properties by decreasing the height of the proposed second floor addition from 234" to 207'and by having the majority of the 1,487 square foot addition occur on the first floor, 1,161 square foot of the addition occurs on the first floor. b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new buildings should harmonize with adjacent development by being consistent or compatible with design and color schemes, and, with the future character of the neighborhood and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments, and provide shielding to prevent spill-over light to adjoining property owners; and The proposed architectural design, materials, finishes, and textures will match the existing building and are compatible with the character of the neighborhood. The project proposes no changes to the location, height, and materials of walls, fencing, and landscaping. Exterior lighting other than that typically used in residential development is not being proposed and no spill-over light uncommon in residential neighborhoods will occur. Furthermore, the proposal has been designed to meet the R-2 Multi -Family Residential Ordinance and does not propose to locate unsightly storage, utility units, and/or parking lots visible to the public right-of-way. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures shall minimize traffic hazards and shall positively Draft Resolution ASA -2017-06 September 27, 2018 Page 3 affect the general appearance of the neighborhood and harmonize with adjacent development; and No signage or outdoor advertising is requested through this proposal. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures The proposed addition is located in an existing duplex located on a flag lot, which makes the development difficult to see from the public right-of-way. The project has been designed in accordance with the development standards of the R-2 Zoning District with the intent to protect residents from unnecessary noise, traffic, light and visually intrusive effects. NOW, TH EREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on Page 3 thereof, the application for an Architectural and Site Approval, Application no. ASA -2017-06, is hereby approved; and That the sub conclusions upon which the findings and conditions specified in this Resolution are based and contained in the public meeting record concerning Application No. ASA -2017-06 asset forth in the Minutes of the Administrative Hearing Meeting of September 27, 2018, and are incorporated by reference herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set prepared by SC Design Group consisting of nine (9) sheets labeled "Gu & Ming Residence", except those as may be amended by conditions in this resolution. 2. ANNOTATION OF THE CONDITION SOF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the building plans. 3. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction Draft Resolution Page 4 ASA -2017-06 September 27, 2018 records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 4. FEN CES Any changes to the fencing shall require design review with the Community Development Department and shall comply with Cupertino Municipal Code Chapter 19.48 Fences 5. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible for consulting with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 3. EXTERIOR BUILDING MATERIALSITREATMENTS Final building exterior treatment plan (including but not limited to details on exterior color, material, architectural treatments, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. Thefinal building exterior plan shall closely resemble the details shown on the original approved plans. Any exterior changes determined to be substantial by the Director of Community Development shall require a modification approval with neighborhood input. Prior to issuance of building permits, staff will review exterior material such as doors and windows to ensure quality and consistency. 4. GEOTECHNICAL PLAN REVIEW The applicant's geotechnical consultant should review and approve all geotechnical aspects of the development plans (i.e., site preparation and grading, site drainage improvements and design parameters for foundations, drainage, pavement and retaining walls) to ensure that their recommendation have been properly incorporated. The following should be performed prior to final (as -built) project approval: The Geotechnical Plan Review should be submitted to the City for review and approval by the City staff prior to issuanceof building permits. 5. GEOTECHNICAL FIELD INSPECTION The geotechnical consultant should inspect, test (as needed), and approve all geotechnical aspects of the project construction. The inspection should include, but not limited: site preparation and grading, site surface and subsurface drainage Draft Resolution Page 5 ASA -2017-06 September 27, 2018 improvements and excavation for foundation and retaining walls prior to the placement of steel and concrete. The following should be specifically performed: The Project Geotechnical Consultant should closely monitor the fill and expansive soil over -excavation, and pool backfill to assure that rigid grid foundation is placed on low -expansion potential materials, and atop suitably compacted fill materials. 6. BUILDING AND FIRE CODE The applicant shall apply for and obtain building permits to allow the construction of the approved project. The applicant shall provide information and plans to allow the Building Official and the Fire Marshall or their designee that the proposed plans comply with Building and Fire Codes in effect at thetimeof application for a building permit. 7. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the "indemnified parties') from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys' fees and costswithin 30daysfollowing receipt of invoicesfrom City. Such attorneys' fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 8. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTH ER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 -day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. Draft Resolution ASA -2017-06 September 27, 2018 Page 6 PASSED AND ADOPTED this 27'" day of September, 2018 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: Erick Serrano Associate Planner APPROVED: Benjamin Fu Asst. Director of Community Development S'or ,, D9� e. O �xF CIO U TT� I'I W zF_ C7 a C fir w00d [)r GENERAL INFORMATION OWNER: ARRY GU & WEI MING ----�--' EMAIL: CIHARRY@GMAIL.COM = i 1<E>EM PHONE: 775 -24❑ -9793 = o 1 PROPERTY 22861 MEDINA LN, ADDRESS: UPERTINO,CA 95014 APN: PN:342-30-01 3 DESCRIPTION OF N>1 ST FLOOR ADDITION: o WORK: N>MASTER BDRM, BTHRM, WIC, HALF THRM, FAMILY ROOM, ENTERTAINMENT <E> � ' 1 ❑❑M 1'161 SQ.FT. LANDSCAPING 1 N>2ND FLOOR ADDITION: I 1 1 ❑ FT 3 2 6 S Q. FT. .a yi I i 1 N>P❑RCH 33 SQ.FT. iy i 16 -- LAND USE: OW/MEDIUM DENSITY (5-1 ❑ DU/AR.) ZONING: 2-4.25 5' PUBLIC OCCUPANCY3/U UTILITY I WI GROUP: EASEMENT •' ' •1 I� TYPE OF - W W 9'„I i 14'-7° • WI CONSTRUCTION: /B, FULLY SPRINKLED STORIES: TWO STORIES NET LOT AREA: 1 0,937 SQ.FT. GROSS LOT AREA: 1 2,202 SQ.FT. W l 1 ST FLOOR z FLOOR CALCULATION 6 PROPERTY _0> .'.Q SETBACK LINE m LJ, REFER TO Al .1 FOR BLOCK DIAGRAM: 5' WIRE -- EXISTING 1ST FLOOR: CLEARANCE w �i. •`OI 1 WI (E) UNIT 1 1,625 SQ.FT. p EASEMENT O "o I 1 (E) GARAGE 871 SQ.FT. O i LL_ (E) UTILITY ROOM 85 SQ.FT. (E) COVERED PORCH 96 SQ.FT. I- .C31 TOTAL EXISTING 1 ST FLOOR 2,690 SQ.FT. (D CV I ASTAIRS <NOT COUNT> 62 SQ.FT. _ <E>6E�TAIN A WA EXISTING 2ND FLOOR: 922 SQ.FT. W NO1JA-N (E) UNIT 2 31 HEIG 1 TOTAL EXISTING BUILDING ON SITE - 1 � 1 TOTAL: 3,554 SQ.FT. <E>FR I T T E 1 .L PROPOSED 1 ST FLOOR ADDITION AREA 4"TBD 1 \ ENTERTAINMENT ROOM, FAMILY ROOM 1" M. BDRM, M. BTHRM, HALF BTHRM, WIC 1,161 SQ. FT. - - 123 -6 FRONT COVERED PORCH 33 SQ. FT. <E>FR IW WRW W 'W PROPOSED 2ND FLOOR ADDITION AREA 4"TBD .. LOFT 326 SQ. FT. 1 I I <N> TOTAL LIVING AREA ON SITE ADDED 1,520 SQ.FT. .y. �WWW. i< PL < IP . 1» T - <E> TOTAL FLOOR AREA 3,554 SQ.FT. i x , <N> TOTAL FLOOR AREA 5,074 SQ.FT. + EXISTING LOT COVERAGE 25.6% 2,690+62+51 =2,803 SQ.FT. ■ <E>L/ PROPOSED LOT COVERAGE 35.3% (REFER TO SHEET A-1.2) ■ 6 HE/ 3,862 SQ.FT. N(B 0� GNT WD( MAX LOT COVERAGE 40% 2 12 4,374.8 SQ.FT.ci PROPOSED FAR: ■ 4,905 / 1 0937 = 44.8% ■ 6 = 0 PROPERTY SETBACKS ■ SETBACK: EXISTING: REQUIRED: PROPOSED: ■ o FRONT 15'-10° 20'-0" NO CHANGE O LEFT SIDE 221-1" 6'-❑" NO CHANGE tj _j RIGHT SIDE 1 1 ' 1" ' 6 0" ' 8 0" LL REAR 22'-10" 10'-0" 18'-6" ■ FRONT 171-1" 20'-0" NO CHANGE ■ O LEFT SIDE 58'-1 1" 9'-0" NO CHANGE ❑Z _j RIGHT SIDE 111 1" 9' 0" 20'-1 1" N LL REAR 451-4" 20'-0" 24'-1" _ 0 ■ ■ CODE & REGULATION o ALL WORK TO COMPLY WITH THE 2016 C.B.C., C.M.C., C.P.C. & 201 6 C.E.C., CALIFORNIA TITLE 24 AMENDMENTS, AND CITY OF CUPERTINO ■ ■ o BUILDING CODE USED PERFORM THE WORK ACCORDING TO THE BUILDING CODES, ORDINANCES AND LAWS OF THE AUTHORITY HAVING JURISDICTION OF THE PROJECT WHICH INCLUDE BUT ARE NOT LIMITED TO: ■ A. 2❑ 1 6 CALIFORNIA BUILDING CODE ■ B. 2D 1 6 CALIFORNIA RESIDENTIAL CODE C. 2016 CALIFORNIA MECHANICAL CODE D. 2❑ 1 6 CALIFORNIA PLUMBING CODE c E. 2016 CALIFORNIA ELECTRICAL CODE F. 2❑ 1 6 CALIFORNIA FIRE CODE ■ G. 2016 CALIFORNIA GREEN BUILDING STANDARD CODE ■ F. CITY OF CUPERTINO MUNICIPAL CODE SITE COTES: ALL DIMENSIONS AND SETBACK POINTS NEED TO BE CHECKED BEFORE THE ARCHITECTURAL ADDI ION TAKES PLACE. PLEASE VERIFY ■ ALL S TBACKS FROM THE BOUNDARY OF ■ THE PtR❑PERTY TO THE <E> HOUSE AND A-1 .❑ COVER SHEET/ SITE PLAN <N> ADDITIONS PRIER TO DIGGING NEW A-1 .1 DEMO PLANS F❑UN ATION AND POURING OF THE A-1 .2 BLOCK DIAGRAMS C❑NC ETE OR FORM WORK SETUP. A-2.0 PROPOSED FLOOR PLANS IF THE SETBACK AT THE SITE ODES N❑T A-3.0 EXISTING AND PROPOSED FRONT ELEVATIONS MATCHcUP TO THE DRAWING OR IS OVER A-3.1 EXISTING AND PROPOSED REAR ELEVATIONS ■ THE APL❑WABLE SETBACK PLEASE A-3.2 EXISTING AND PROPOSED LEFT ELEVATIONS CONTACT THE PROJECT ARCHITECT FOR A-3.3 EXISTING AND PROPOSED RIGHT ELEVATIONS ■ A-3.4 PROPOSED CROSS SECTIONS FURTHIfR GUIDANCE ON THE PROJECT. PROJECT DATA i • GENERAL NOTES • 1 WORKING HOURS: No WORK SHALL COMMENCE ON THE JOB SITE PRIOR To 7:❑❑ A.M. NOR 6. IN CASE OF ANY DISCREPANCY IN THE CONTRACT DOCUMENTS, CONSULT THE ARCHITECT G U & MING CONTINUE LATER THAN 6:00 P.M., MONDAY THROUGH FRIDAY, NOR SHALL ANY WORK BE BEFORE PROCEEDING. RESIDENCE PERMITTED ON SATURDY OF SUNDAY UNLESS PRIOR APPROVAL IS GRANTED BY THE BUILDING 7. No DIMENSIONS SHALL BE TAKEN BY SCALING FROM THE DRAWINGS. DETAILS TAKE OFFICAL. PRECEDENCE OVER GENERAL SECTIONS OR FLOOR PLANS. IF DIMENSIONS MUST BE 2. GENERAL CONTRACTOR SHALL VERIFY ALL UNDERGROUND UTILITY LOCATIONS PRIOR TO CLARIFIED, CONSULT THE ARCHITECT. REFER TO THE COVER SHEET FOR DIMENSIONING EXCAVATION, TRENCHING, OR GRADING OF ANY KIND. GENERAL CONTRACTOR SHALL COORDINATE STANDARDS. WITH APPLICABLE UTILITY COMPANIES WHEN REROUTING ELECTRICAL, TELEPHONE, CABLE TV, GAS, B. VERIFY ALL DIMENSIONS ON THE JOB SITE PRIOR TO ORDERING OR MANUFACTURING. 22861 MEDINA LN WATER, SANITARY SEWER SERVICES, OR ANY OTHER UTILITY. G. C. SHALL MAINTAIN ALL 9. GENERAL CONTRACTOR SHALL REVIEW ALL ARCHITECTURAL DRAWINGS BEFORE FRAMING. CUPERTIN❑,CA 95❑ 1 4 ELECTRICAL AND COMMUNICATION SYSTEMS IN HOUSE AT ALL TIMES. COORDINATE RECESSED LIGHT FIXTURE LOCATIONS, SHAFTS, AND HVAC DUCTWORK PRIOR 3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL GOVERNING CODES, ORDINANCES, TO FRAMING. IT IS IMPERATIVE THAT FRAMING MEMBER LOCATIONS D❑ NOT CONFLICT WITH AND REGULATIONS, G. C. SHALL BECOME FAMILIAR WITH ALL CITY OF ASPECTS ❑F WORKING. LOCATIONS OF RECESSED LIGHT FIXTURES. IF CONFLICT EXISTS, NOTIFY ARCHITECT. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION AND EXECUTION OF THE 10. GENERAL CONTRACTOR SHALL INSTALL ALL APPLIANCES SPECIFIED AND ALL NEW WORK SHOWN OR IMPLIED IN THE CONSTRUCTION DOCUMENTS AND IS RESPONSIBLE FOR EQUIPMENT ACCORDING TO MANUFACTURER'S INSTRUCTIONS. ALL GUARANTEES, CONSTRUCTION MEANS, METHODS, AND PROCEDURES. INSTRUCTION BOOKLETS, AND INFORMATION REGARDING NEW EQUIPMENT SHALL BE 4. GENERAL CONTRACTOR SHALL COORDINATE ALL FACETS OF HIS WORK AND ALL TRADES INVOLVED HANDED DIRECTLY TO THE OWNER IN ONE MANILA ENVELOPE AT THE TIME OF SUBSTANTIAL TO AVOID CONFLICT IN THE LOCATION, INSTALLATION, AND CONSTRUCTION OF ALL ITEMS OF COMPLETION. CONTRACTOR SHALL VERIFY THAT EVERY PIECE OF EQUIPMENT AND EVERY WORK AS INDICATED ON THE CONSTRUCTION DOCUMENTS. IF ANY WORK IS TO BE INSTALLED BY APPLIANCE IS IN PERFECT WORKING ORDER AND THAT INFORMATION ABOUT ALL >SYPRESS THE OWNER DIRECTLY, ALLOWANCES FOR THE OWNERS WORK MUST BE MADE. COORDINATE WITH WARRANTIES AND GUARANTEES IS MADE KNOWN TO THE OWNER. 10"TBD ARCHITECT / OWNER. 1 1. THE INSTALLER OF EACH MAJOR UNIT OF WORK IS REQUIRED TO INSPECT THE SUBSTRATE 5. GENERAL CONTRACTOR SHALL LEAVE THE JOB SITE "BROOM CLEAN" AT THE END OF EACH AND CONDITIONS TO RECEIVE WORK AND SHALL REPORT ALL UNSATISFACTORY CONDITIONS WORKING DAY. ALL MATERIALS SHALL BE STORED IN A NEAT AND SAFE PLACE TO AVOID TO THE GENERAL CONTRACTOR AND NOT PROCEED UNTIL SATISFACTORY CONDITIONS ARE 20370 TOWN CENTER LN <E>SYPRESS ACCIDENTS, FOR CONSTRUCTION AND FOR THE OWNER. ATTAINED. SUITE 1 39 12. FOR MOUNTING HEIGHTS N❑T CLEARLY OUTLINED IN THE PLANS OR SCHEDULES, CUPERTINO, CA 9501 4 IN 10" COORDINATE WITH THE ARCHITECT. ARCHITECT SHALL CONFIRM ALL ELECTRICAL DEVICE 40B.B65.0577 pN AND LIGHT FIXTURE LOCATIONS BEFORE CONTRACTOR PULLS WIRE. ON \ 13. PROVIDE SOLID BLOCKING AS NECESSARY FOR WALL MOUNTED SHELVES, FIXTURES, AND FITTINGS, EVEN WHEN WORK IS TO BE DONE BY OWNER DIRECTLY. REVIEW SCOPE OF WORK 7_01� AND LOCATIONS FROM INTERIOR ELEVATIONS AND COORDINATE WITH OWNER/ARCHITECT. • • 14. ALL FASTENING DEVICES TO BE CONCEALED, UNLESS OTHERWISE SHOWN. 15. WEATHER-STRIP ALL EXTERIOR DOORS AND WINDOWS. \ \ Q • • 16. CAULK OR OTHERWISE SEAL AROUND ALL OPENINGS TO LIMIT INFILTRATION, INCLUDING BUT \\ �� ` • NOT LIMITED TO: EXTERIOR JOINTS AROUND WINDOWS AND DOOR FRAMES, BETWEEN SOLE \�� /�.� • ` PLATES AND FLOORS AND BETWEEN EXTERIOR WALL PANELS. • 17. GENERAL CONTRACTOR SHALL VERIFY THAT ALL WORK ON THE EXTERIOR OF THE PROJECT •IS WATERTIGHT. ALL JOINTS EXPOSED TO THE ELEMENTS SHALL BE TESTED FOR WATER ` PUBLIC UTILITY • • TIGHTNESS PRIOR TO SUBSTANTIAL COMPLETION. z k EMENT • • left SCK w �, `•• �5`� WIRE CLEARANCE r--C------� 8'-0" ASEMENT • • z i� 1 • 1 I O • / O •. ---------------- & 2ND FLOOR r O E q CK _TI Q-,, O <E>PARK NG O 0 2 . Medina n N `� / Ln Ln 2 fTl D � tSedina Medina � W = 0 N I Oak Ct O r (� (n n N ■ 140-iee cn Financial Strve N v O w` z � O, cn °° D COs <E>FRUIT z TREE VICINITY MAP 4" TB D GENERAL INFORMATION OWNER: ARRY GU & WEI MING ----�--' EMAIL: CIHARRY@GMAIL.COM = i 1<E>EM PHONE: 775 -24❑ -9793 = o 1 PROPERTY 22861 MEDINA LN, ADDRESS: UPERTINO,CA 95014 APN: PN:342-30-01 3 DESCRIPTION OF N>1 ST FLOOR ADDITION: o WORK: N>MASTER BDRM, BTHRM, WIC, HALF THRM, FAMILY ROOM, ENTERTAINMENT <E> � ' 1 ❑❑M 1'161 SQ.FT. LANDSCAPING 1 N>2ND FLOOR ADDITION: I 1 1 ❑ FT 3 2 6 S Q. FT. .a yi I i 1 N>P❑RCH 33 SQ.FT. iy i 16 -- LAND USE: OW/MEDIUM DENSITY (5-1 ❑ DU/AR.) ZONING: 2-4.25 5' PUBLIC OCCUPANCY3/U UTILITY I WI GROUP: EASEMENT •' ' •1 I� TYPE OF - W W 9'„I i 14'-7° • WI CONSTRUCTION: /B, FULLY SPRINKLED STORIES: TWO STORIES NET LOT AREA: 1 0,937 SQ.FT. GROSS LOT AREA: 1 2,202 SQ.FT. W l 1 ST FLOOR z FLOOR CALCULATION 6 PROPERTY _0> .'.Q SETBACK LINE m LJ, REFER TO Al .1 FOR BLOCK DIAGRAM: 5' WIRE -- EXISTING 1ST FLOOR: CLEARANCE w �i. •`OI 1 WI (E) UNIT 1 1,625 SQ.FT. p EASEMENT O "o I 1 (E) GARAGE 871 SQ.FT. O i LL_ (E) UTILITY ROOM 85 SQ.FT. (E) COVERED PORCH 96 SQ.FT. I- .C31 TOTAL EXISTING 1 ST FLOOR 2,690 SQ.FT. (D CV I ASTAIRS <NOT COUNT> 62 SQ.FT. _ <E>6E�TAIN A WA EXISTING 2ND FLOOR: 922 SQ.FT. W NO1JA-N (E) UNIT 2 31 HEIG 1 TOTAL EXISTING BUILDING ON SITE - 1 � 1 TOTAL: 3,554 SQ.FT. <E>FR I T T E 1 .L PROPOSED 1 ST FLOOR ADDITION AREA 4"TBD 1 \ ENTERTAINMENT ROOM, FAMILY ROOM 1" M. BDRM, M. BTHRM, HALF BTHRM, WIC 1,161 SQ. FT. - - 123 -6 FRONT COVERED PORCH 33 SQ. FT. <E>FR IW WRW W 'W PROPOSED 2ND FLOOR ADDITION AREA 4"TBD .. LOFT 326 SQ. FT. 1 I I <N> TOTAL LIVING AREA ON SITE ADDED 1,520 SQ.FT. .y. �WWW. i< PL < IP . 1» T - <E> TOTAL FLOOR AREA 3,554 SQ.FT. i x , <N> TOTAL FLOOR AREA 5,074 SQ.FT. + EXISTING LOT COVERAGE 25.6% 2,690+62+51 =2,803 SQ.FT. ■ <E>L/ PROPOSED LOT COVERAGE 35.3% (REFER TO SHEET A-1.2) ■ 6 HE/ 3,862 SQ.FT. N(B 0� GNT WD( MAX LOT COVERAGE 40% 2 12 4,374.8 SQ.FT.ci PROPOSED FAR: ■ 4,905 / 1 0937 = 44.8% ■ 6 = 0 PROPERTY SETBACKS ■ SETBACK: EXISTING: REQUIRED: PROPOSED: ■ o FRONT 15'-10° 20'-0" NO CHANGE O LEFT SIDE 221-1" 6'-❑" NO CHANGE tj _j RIGHT SIDE 1 1 ' 1" ' 6 0" ' 8 0" LL REAR 22'-10" 10'-0" 18'-6" ■ FRONT 171-1" 20'-0" NO CHANGE ■ O LEFT SIDE 58'-1 1" 9'-0" NO CHANGE ❑Z _j RIGHT SIDE 111 1" 9' 0" 20'-1 1" N LL REAR 451-4" 20'-0" 24'-1" _ 0 ■ ■ CODE & REGULATION o ALL WORK TO COMPLY WITH THE 2016 C.B.C., C.M.C., C.P.C. & 201 6 C.E.C., CALIFORNIA TITLE 24 AMENDMENTS, AND CITY OF CUPERTINO ■ ■ o BUILDING CODE USED PERFORM THE WORK ACCORDING TO THE BUILDING CODES, ORDINANCES AND LAWS OF THE AUTHORITY HAVING JURISDICTION OF THE PROJECT WHICH INCLUDE BUT ARE NOT LIMITED TO: ■ A. 2❑ 1 6 CALIFORNIA BUILDING CODE ■ B. 2D 1 6 CALIFORNIA RESIDENTIAL CODE C. 2016 CALIFORNIA MECHANICAL CODE D. 2❑ 1 6 CALIFORNIA PLUMBING CODE c E. 2016 CALIFORNIA ELECTRICAL CODE F. 2❑ 1 6 CALIFORNIA FIRE CODE ■ G. 2016 CALIFORNIA GREEN BUILDING STANDARD CODE ■ F. CITY OF CUPERTINO MUNICIPAL CODE SITE COTES: ALL DIMENSIONS AND SETBACK POINTS NEED TO BE CHECKED BEFORE THE ARCHITECTURAL ADDI ION TAKES PLACE. PLEASE VERIFY ■ ALL S TBACKS FROM THE BOUNDARY OF ■ THE PtR❑PERTY TO THE <E> HOUSE AND A-1 .❑ COVER SHEET/ SITE PLAN <N> ADDITIONS PRIER TO DIGGING NEW A-1 .1 DEMO PLANS F❑UN ATION AND POURING OF THE A-1 .2 BLOCK DIAGRAMS C❑NC ETE OR FORM WORK SETUP. A-2.0 PROPOSED FLOOR PLANS IF THE SETBACK AT THE SITE ODES N❑T A-3.0 EXISTING AND PROPOSED FRONT ELEVATIONS MATCHcUP TO THE DRAWING OR IS OVER A-3.1 EXISTING AND PROPOSED REAR ELEVATIONS ■ THE APL❑WABLE SETBACK PLEASE A-3.2 EXISTING AND PROPOSED LEFT ELEVATIONS CONTACT THE PROJECT ARCHITECT FOR A-3.3 EXISTING AND PROPOSED RIGHT ELEVATIONS ■ A-3.4 PROPOSED CROSS SECTIONS FURTHIfR GUIDANCE ON THE PROJECT. PROJECT DATA i • GENERAL NOTES • 1 WORKING HOURS: No WORK SHALL COMMENCE ON THE JOB SITE PRIOR To 7:❑❑ A.M. NOR 6. IN CASE OF ANY DISCREPANCY IN THE CONTRACT DOCUMENTS, CONSULT THE ARCHITECT G U & MING CONTINUE LATER THAN 6:00 P.M., MONDAY THROUGH FRIDAY, NOR SHALL ANY WORK BE BEFORE PROCEEDING. RESIDENCE PERMITTED ON SATURDY OF SUNDAY UNLESS PRIOR APPROVAL IS GRANTED BY THE BUILDING 7. No DIMENSIONS SHALL BE TAKEN BY SCALING FROM THE DRAWINGS. DETAILS TAKE OFFICAL. PRECEDENCE OVER GENERAL SECTIONS OR FLOOR PLANS. IF DIMENSIONS MUST BE 2. GENERAL CONTRACTOR SHALL VERIFY ALL UNDERGROUND UTILITY LOCATIONS PRIOR TO CLARIFIED, CONSULT THE ARCHITECT. REFER TO THE COVER SHEET FOR DIMENSIONING EXCAVATION, TRENCHING, OR GRADING OF ANY KIND. GENERAL CONTRACTOR SHALL COORDINATE STANDARDS. WITH APPLICABLE UTILITY COMPANIES WHEN REROUTING ELECTRICAL, TELEPHONE, CABLE TV, GAS, B. VERIFY ALL DIMENSIONS ON THE JOB SITE PRIOR TO ORDERING OR MANUFACTURING. 22861 MEDINA LN WATER, SANITARY SEWER SERVICES, OR ANY OTHER UTILITY. G. C. SHALL MAINTAIN ALL 9. GENERAL CONTRACTOR SHALL REVIEW ALL ARCHITECTURAL DRAWINGS BEFORE FRAMING. CUPERTIN❑,CA 95❑ 1 4 ELECTRICAL AND COMMUNICATION SYSTEMS IN HOUSE AT ALL TIMES. COORDINATE RECESSED LIGHT FIXTURE LOCATIONS, SHAFTS, AND HVAC DUCTWORK PRIOR 3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL GOVERNING CODES, ORDINANCES, TO FRAMING. IT IS IMPERATIVE THAT FRAMING MEMBER LOCATIONS D❑ NOT CONFLICT WITH AND REGULATIONS, G. C. SHALL BECOME FAMILIAR WITH ALL CITY OF ASPECTS ❑F WORKING. LOCATIONS OF RECESSED LIGHT FIXTURES. IF CONFLICT EXISTS, NOTIFY ARCHITECT. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION AND EXECUTION OF THE 10. GENERAL CONTRACTOR SHALL INSTALL ALL APPLIANCES SPECIFIED AND ALL NEW WORK SHOWN OR IMPLIED IN THE CONSTRUCTION DOCUMENTS AND IS RESPONSIBLE FOR EQUIPMENT ACCORDING TO MANUFACTURER'S INSTRUCTIONS. ALL GUARANTEES, CONSTRUCTION MEANS, METHODS, AND PROCEDURES. INSTRUCTION BOOKLETS, AND INFORMATION REGARDING NEW EQUIPMENT SHALL BE 4. GENERAL CONTRACTOR SHALL COORDINATE ALL FACETS OF HIS WORK AND ALL TRADES INVOLVED HANDED DIRECTLY TO THE OWNER IN ONE MANILA ENVELOPE AT THE TIME OF SUBSTANTIAL TO AVOID CONFLICT IN THE LOCATION, INSTALLATION, AND CONSTRUCTION OF ALL ITEMS OF COMPLETION. CONTRACTOR SHALL VERIFY THAT EVERY PIECE OF EQUIPMENT AND EVERY WORK AS INDICATED ON THE CONSTRUCTION DOCUMENTS. IF ANY WORK IS TO BE INSTALLED BY APPLIANCE IS IN PERFECT WORKING ORDER AND THAT INFORMATION ABOUT ALL >SYPRESS THE OWNER DIRECTLY, ALLOWANCES FOR THE OWNERS WORK MUST BE MADE. COORDINATE WITH WARRANTIES AND GUARANTEES IS MADE KNOWN TO THE OWNER. 10"TBD ARCHITECT / OWNER. 1 1. THE INSTALLER OF EACH MAJOR UNIT OF WORK IS REQUIRED TO INSPECT THE SUBSTRATE 5. GENERAL CONTRACTOR SHALL LEAVE THE JOB SITE "BROOM CLEAN" AT THE END OF EACH AND CONDITIONS TO RECEIVE WORK AND SHALL REPORT ALL UNSATISFACTORY CONDITIONS WORKING DAY. ALL MATERIALS SHALL BE STORED IN A NEAT AND SAFE PLACE TO AVOID TO THE GENERAL CONTRACTOR AND NOT PROCEED UNTIL SATISFACTORY CONDITIONS ARE 20370 TOWN CENTER LN <E>SYPRESS ACCIDENTS, FOR CONSTRUCTION AND FOR THE OWNER. ATTAINED. SUITE 1 39 12. FOR MOUNTING HEIGHTS N❑T CLEARLY OUTLINED IN THE PLANS OR SCHEDULES, CUPERTINO, CA 9501 4 IN 10" COORDINATE WITH THE ARCHITECT. ARCHITECT SHALL CONFIRM ALL ELECTRICAL DEVICE 40B.B65.0577 pN AND LIGHT FIXTURE LOCATIONS BEFORE CONTRACTOR PULLS WIRE. ON \ 13. PROVIDE SOLID BLOCKING AS NECESSARY FOR WALL MOUNTED SHELVES, FIXTURES, AND FITTINGS, EVEN WHEN WORK IS TO BE DONE BY OWNER DIRECTLY. REVIEW SCOPE OF WORK 7_01� AND LOCATIONS FROM INTERIOR ELEVATIONS AND COORDINATE WITH OWNER/ARCHITECT. • • 14. ALL FASTENING DEVICES TO BE CONCEALED, UNLESS OTHERWISE SHOWN. 15. WEATHER-STRIP ALL EXTERIOR DOORS AND WINDOWS. \ \ Q • • 16. CAULK OR OTHERWISE SEAL AROUND ALL OPENINGS TO LIMIT INFILTRATION, INCLUDING BUT \\ �� ` • NOT LIMITED TO: EXTERIOR JOINTS AROUND WINDOWS AND DOOR FRAMES, BETWEEN SOLE \�� /�.� • ` PLATES AND FLOORS AND BETWEEN EXTERIOR WALL PANELS. • 17. GENERAL CONTRACTOR SHALL VERIFY THAT ALL WORK ON THE EXTERIOR OF THE PROJECT •IS WATERTIGHT. ALL JOINTS EXPOSED TO THE ELEMENTS SHALL BE TESTED FOR WATER ` PUBLIC UTILITY • • TIGHTNESS PRIOR TO SUBSTANTIAL COMPLETION. z k EMENT • • left SCK w �, `•• �5`� WIRE CLEARANCE r--C------� 8'-0" ASEMENT • • z i� 1 • 1 I O • / O •. ---------------- & 2ND FLOOR -- E q CK o <E>PARK NG 0 0 <E>PARKING N `� / � 10'-0" o 10' 0" 0 N _" 2ND STORY 20' PROPERTY SETBACK LINE <E>FRUIT TREE TO BE REMOVED 6"TBD I O O <E>PALM TREE 12"TBD N O N Q0 z <E>PALM 10"TBD 20' PROP SETBACK <E>PALM TRE 8"TBD I 1 REVISION 09.07.2016 1ST PRELIMINARY PLANNING 02.2017 2ND PRELIMINARY P NNING R 06.2017 PLANNING REVIEW 1 10.2017 PLANNING REVIEW 2 12.2017 PLANNING REVIEW 3 01.2018 PLANNING REVIEW 4 05.2018 PLANNING REVIEW/5 07.19,18 PLANNING REVIEW PROJECT NO. 1612 DATE 02.2017 SITE PLAN A-1.0 <E>EM II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II u \ \ \ \ \ \ \ \ I \ \ \ \ \ \ \ I / \ I / <E>SWIMMING POOL TO BE DEMOLISHED / I I / I / I / \ \ I\ \ \ \ \ \ \ \ \ \ \ \ \ \ J / / / / i WIND❑W TO BE REMOVED / I TO BE RELOCATED I I II / II II II II DEMO PLAN -EXISTING 1 ST FLOOR PLAN 1-❑ SCALE: 1/4'' = ll' -O" DEMO WALL EXST. WALL 2-❑ / / / EE O ° ° <E>KITCHEN O° <E>DINING DEMO PLAN - EXISTING 2ND FLOOR PLAN SCALE: 1/4" = 1 '-O° GU & MING RESIDENCE 22861 MEDINA LN CUPERTIND,CA 95014 20370 TOWN CENTER LN SUITE 139 CUPERTINO, CA 9501 4 408.865.0577 REVISION 09.07.2016 1ST PRELIMINARY PLANNING 02.2017 2ND PRELIMINARY PLANNING R 06.2017 PLANNING REVIEW 10.2017 PLANNING REVIEW 12.2017 PLANNING REVIEWAl 01.2018 PLANNING REVIEW 05.2018 PLANNING REVIEW PROJECT NO. 1612 DATE 02.2017 DEMO PLANS -"qqftft•• ■ PROPOSED BLOCK DIAGRAM -1 ST FLOOR • • 3-O ■ SCALE: 1 /B'' = 1 '-O�� ■ ♦ I 442.8 SQ FT 16'-3" 58.2 SQ FT 14' / / 9 237.8 SQ`FT 30 SQ FT 2ND FLOOR UNIT 2 0 254.4 SQ FT 12'-10" PROPOSED BLOCK 4-0 DIAGRAM -2ND FLOOR SCALE: 1/B'' = ll' -O" NET LOT AREA: 1 0,937 SQ FT EXISTING FLOOR AREA: UNIT #1 (1) 1,625 SQ FT GARAGE (2) 871 SQ FT DEMO (5) 51 SQ FT DEMO (6) 85 SQ FT UNIT #2 (7) 922 SQ FT TOTAL: 3,554 SQ FT LOT COVERAGE: (1) 1,63B SQ FT (2) 871 SQ FT (3) 96 SQ FT (4) 63 SQ FT (5) 51 SQ FT (6) 85 SQ FT TOTAL: 2,804 SQ FT 35.3% 25.6% UNIT #1: 1,625 SQ FT UNIT #2: 922 SQ FT 1 ST TO 2ND UNIT RATIO: 1.76 � A - I N 224.8 SQ FT 9'-1" USABLE REAR YARD AREA: (1 0) 2,455 SQ FT LOT WIDTH X 20 = 1 1 31-411 X 20 =2,266 SQ FT THEREFORE, THE REAR YARD SETBACK COULD BE REDUCED TO 1 0 FEET ADDITION: (8) 1, 1 61 SQ FT (9) 326 SQ FT (1 1) 33 SQ FT TOTAL: 1,525 SQ FT PROPOSED FLOOR AREA: (1) 1,625 SQ FT (2) 871 SQ FT (7) 922 SQ FT (8) 1, 1 61 SQ FT (9) 326 SQ FT TOTAL: 4,905 SQ FT FAR: 44.8% R■lls■l■1VI2111:L'trl4 (1) 1,638 SQ FT (2) 871 SQ FT (3) 96 SQ FT (4) 63 SQ FT (8) 1, 1 6 1 SQ FT (1 1) 33 SQ FT TOTAL: 3,862 SQ FT 35.3% 1 ST UNIT: 1,625 SQ FT 2ND UNIT: 922 + 1 , 1 61 +326=2,409 SQ FT 2ND TO 1 ST UNIT RATIO: 1.48 PROPOSED FAR: 4,905/ 10,937 = 44.8% 0 GU & MING RESIDENCE 22861 MEDINA LN CUPERTINO,CA 9SD14 20370 TOWN CENTER LN SUITE 139 CUPERTINO, CA 9501 4 408.865.0577 REVISION 09.07.2016 1ST PRELIMINARY PLANNING 02.2017 2ND PRELIMINARY P NNING R 06.2017 PLANNING REVIEW 1 10.2017 PLANNING REVIEW 2 12.2017 PLANNING REVIEW 01.2018 PLANNING REVIEW 05.2018 PLANNING REVIEW 07.19.2018 PLANNING REVIEW PROJECT NO. 1612 DATE 02.2017 BLOCK D IAB RAM S A-1.2 1-❑ PROPOSED PLAN 0 2' 4' 8' EXST. WALL NEW WALL SCALE: 1/4" = 0" DEMO WALL Implm■l PROPOSED 2ND FLOOR PLAN SCALE: 1/4'' = ll' -O" GU & MING RESIDENCE 22861 MEDINA LN CUPERTINO,CA 95014 20370 TOWN CENTER LN SUITE 139 CUPERTINO, CA 9501 4 408.865.0577 REVISION 09.07.2016 1ST PRELIMINARY PLANNING 02.2017 2ND PRELIMINARY PLANNING R 06.2017 PLANNING REVIEW 10.2017 PLANNING REVIEW 12.2017 PLANNING REVIEW 01.2018 PLANNING REVIEW 05.2018 PLANNING REVIEW 2 �3 PROJECT NO. 1612 DATE 02.2017 PROPOSED FLOOR PLANS A-2.0 1-❑ PROPOSED ELEVATION FRONT SOUTH 1' SCALE: 1/4" V-0" 2-❑ EXISTING ELEVATION FRONT SOUTH 0 - 4' b' SCALE: 1/4" V-0" GU & MING RESIDENCE 22861 MEDINA LN CUPERTIN❑,CA 95014 2037❑ T❑WN CENTER LN SUITE 139 CUPERTIN❑, CA 9501 4 408.865.0577 REVISION 09.07.2016 1ST PRELIMINARY PLANNING 02.2017 2ND PRELIMINARY PLANNING R 06.2017 PLANNING REVIEW 10.2017 PLANNING REVIEW 12.2017 PLANNING REVIEW 01.2018 PLANNING REVIEW 05.2018 PLANNING REVIEW PROJECT NO. 1612 DATE 02.2017 EXISTING & PROPOSED FRONT ELEVATIONS A-3.0 1-❑ PROPOSED ELEVATION REAR NORTH 0 2' 4' 8' SCALE: 1/4" V-0" OwAmml EXISTING ELEVATION REAR NORTH 0 2' 4' 8' SCALE: 1/4)) - V-0" 0" GU & MING RESIDENCE 22861 MEDINA LN CUPERTIN❑,CA 95014 20370 TOWN CENTER LN SUITE 139 CUPERTINO, CA 9501 4 408.865.0577 REVISION 09.07.2016 1ST PRELIMINARY PLANNING 02.2017 2ND PRELIMINARY PLANNING R 06.2017 PLANNING REVIEW 10.2017 PLANNING REVIEW 12.2017 PLANNING REVIEW 01.2018 PLANNING REVIEW 05.2018 PLANNING REVIEW 2 �3 PROJECT NO. 1612 DATE 02.2017 EXISTING & PROPOSED REAR ELEVATIONS A-3.1 1-❑ PROPOSED ELEVATION WEST SCALE: 1/4" V-0" Implm■l EXISTING ELEVATION WEST SCALE: 1/4)) - V-0" 0" 11 GU & MING RESIDENCE 22861 MEDINA LN CUPERTIN❑,CA 95014 20370 TOWN CENTER LN SUITE 139 CUPERTIN❑, CA 9501 4 408.865.0577 REVISION 09.07.2016 1ST PRELIMINARY PLANNING 02.2017 2ND PRELIMINARY PLANNING R 06.2017 PLANNING REVIEW 10.2017 PLANNING REVIEW 12.2017 PLANNING REVIEW 01.2018 PLANNING REVIEW 05.2018 PLANNING REVIEW PROJECT NO. 1612 DATE 02.2017 EXISTING & PROPOSED LEFT ELEVATIONS A-3.2 1-0 PROPOSED ELEVATION EAST 0 2' SCALE: 1/4" 0 �n I i� N — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — - - — — — — —------------ --------------------- — 8'-0° (E) C.P. 7-7 C-771 O O O 0 0 0 o O C 0 0 o a EXISTING ELEVATION EAST 2-O SCALE: I/,-'- 12 /-' 12 -z-�4 — — — — — — — — — — — — — — — — — — — — — -- -- - - - - - - - - - - - - ------------ -Fr 1 1 Tr , , TT TT -F-,' , -T-'r I I Tr " 16'-4" I — — — — — — — — — - ----- v 0 i GU & MING RESIDENCE 22861 MEDINA LN CUPERTIN❑,CA 95014 20370 TOWN CENTER LN SUITE 139 CUPERTIN❑, CA 9501 4 408.865.0577 09.07.2016 1ST PRELIMINARY PLANNING REV 02.2017 2ND PRELIMINARY PLANNING REVEV 06.2017 PLANNING REVIEW 10.2017 PLANNING REVIEW �,� 12.2017 PLANNING REVIEW / 1 01.2018 PLANNING REVIEW 05.2018 PLANNING REVIEW PROJECT NO. 1612 DATE 02.2017 1 EXISTING & PROPOSED RIGHT ELEVATIONS A-3.3 rru — — — — — — — — — — — — — — — — — — — — — -- -- - - - - - - - - - - - - ------------ -Fr 1 1 Tr , , TT TT -F-,' , -T-'r I I Tr " 16'-4" I — — — — — — — — — - ----- v 0 i GU & MING RESIDENCE 22861 MEDINA LN CUPERTIN❑,CA 95014 20370 TOWN CENTER LN SUITE 139 CUPERTIN❑, CA 9501 4 408.865.0577 09.07.2016 1ST PRELIMINARY PLANNING REV 02.2017 2ND PRELIMINARY PLANNING REVEV 06.2017 PLANNING REVIEW 10.2017 PLANNING REVIEW �,� 12.2017 PLANNING REVIEW / 1 01.2018 PLANNING REVIEW 05.2018 PLANNING REVIEW PROJECT NO. 1612 DATE 02.2017 1 EXISTING & PROPOSED RIGHT ELEVATIONS A-3.3 PROPOSED CROSS SECTION A -A A -A 0 2' 4' 8' SCALE: 1 /4" 1 ' 0" PROPOSED SECTION B -B 0 2' 4' 8' SCALE: 1/4" 1 ' 0" GU & MING RESIDENCE 22861 MEDINA LN CUPERTIN❑,CA 95014 20370 TOWN CENTER LN SUITE 139 CUPERTINO, CA 9501 4 408.865.0577 REVISION 09.07.2016 1ST PRELIMINARY PLANNING 02.2017 2ND PRELIMINARY PLANNING R 06.2017 PLANNING REVIEW 10.2017 PLANNING REVIEW 12.2017 PLANNING REVIEWAl 01.2018 PLANNING REVIEW PROJECT NO. 1612 DATE 02.2017 PROPOSED SECTIONS A3.4 Date: September 6, 2018 Reference Attachments: Memo from Haisong Gu (undated) Drawing: Gu & Ming Residence, 22861 Medina LN, Cupertino, CA 95014 To : De Anza Oaks Homeowners Association C/O Grayson Property Management To: City of Cupertino Building Department To Whom it May Concern, I am not an architect. Even though I attempted to discern what was shown to me described as being for my reference, on an impossibly small diagram which I had enlarged, I cannot understand the drawing and the level of detail presented. Consequently, I have no idea how this project will affect me during construction nor when finished. An elevation drawing/sketch of the finished project in relation to my property would also be helpful. This is not merely "...some renovation to our home.", (paragraph one). This is not a convincing way of `...reaching out to share plans and address any concerns I may have'; I anticipate much noise from hammering and the clattering of equipment and dust. Moreover, the activity will take -place at the property boundary with De Anza Oaks Homeowners Association, which involves more than myself as a homeowner. I am requesting that Grayson Property Management inform the Board of Directors of our HOA, that the Grayson Company contact the City of Cupertino to review concerns, and that The City involve our HOA and the Grayson Company and any homeowners along the common boundary. I have gleaned some information from the many details posted at various locations on the drawing, as follows: "They will not work prior to 7 am.". REALLY! I don't plan to be disturbed prior to Sam! Especially because workmen will gather and stage equipment and listen to radio during work hours. "They can work on weekends if prior approval is granted". NOT IF I HAVE A RIGHT TO QUIET! The property homeowner of the Medina LN residence has a eucalyptus tree on their property with branches overhanging on my property; the branches on their side have been removed, but the branches on my side remain. I want those branches removed from my property and don't want a eucalyptus tree or pole above my fence line. Will their HVAC system provide me with unwanted noise when in use? The height of their second story appears to be 18 feet. Is the base of their property higher than mine? Will their windows/balcony look into mine? The drawing lists a fence at a 6 -foot height. I don't want the fence lower than it currently is. Moreover, a clear definition of enforceable responsibility acceptable to me, if and when the common fence between the properties needs to be replaced, should be agreed to by our HOA and others along the fence. I do not have the understanding of other possible concerns because I do not understand the elements that will affect me in the plan presented to me. l �l� p Gla s Smith 23028 Cricket Hill Road, Cupertino, CA, 95014 Dear Property Owner/Neighbor, I'm the current owner of 22861 Medina Lane, Cupertino, CA 95014 and am writing to let you know about a City Council proposal that our family has submitted for some renovation to our home. You should expect to hear from the City about a hearing in September regarding this project, but wanted to reach out ahead of time to share with you our plans and address any concerns you may have. Our renovation work will be limited to extending our unit into the backyard which previously housed a pool. Our home is a duplex and the renovation will not make any changes to the number of units. For your reference, please see attached a draft of our renovation plan. If the plan is approved, we will do our utmost to minimize the renovation's impact on the neighborhood. Please do not hesitate to reach out via email or phone with any questions or concerns. Thank you in advance for your cooperation. Respectfully, Haisong Gu 22861 Medina Lane #A, Cupertino, CA 95014 (775) 240-9793 rciharryCD-gmail .com aN+ETpIWNC WAIL <N> 10T FLOOR <N> 3NO FLOOR GENERAL NOTES _ ADDITION: ADDITION: GIS & MING _ YNE�NTRupo RET <N>MB ABTERDRM. <N>LOFT 1 RESIDENCE R' L �ENy ST RM. WIC, HALF BTHRM. xeannmaeuxwr unm...we A..,wa.n B.PR[onraBUAmxu T E FAMILY ROOM. NORN .r' O pp'�I�CALW. N$9- ENTERTAINMENT ROOM a unwe ae<mm.Re..: ro.xe enxe. exm ru, unnn.wx, F 9-g 25" rxwnux xu 9 MEDINA LN 1 w CUPE0.TINO .CA 95v14 :� a mq 3 . - .3g• 1 l•' SIPRESS .x, ia.ea.uxe:ur ro.:d`.ArvAP zG4 N 'ANosc « ro-reo �>SYPRE55 a [B wi: q">w O YPoN SPP ABO.W'Itm vm. •} i N �MAIl�E CRABE fW E>SYPRE55 .xne.e„xrvwrie'.'ee. wnnx,oc coe,ow.rt mx °prt "� mi. Z 1 t- rsr .9 .,.-«� <.x...:Mnu. u....xr.xxn. ..xa.,n...a,a,xPP=FN ,'.CE>SYPRE5S VICINITY MAP ¢>mIAr TREE ��� I aWN _' • rare r.,PP..L UB•.N[ < rEm, Yl I A �AWA RS 7PALIOBAY_ GENERAL INFORMATION ALI :ods°M ...x.u.�.r..�..<.....,.. wAI Tur a [s N N.27­ • z �1 .' I M i :j V 1.,.; 5.1�., • ..,�•` I ' PUBLIC UTNTY `` • ,M— F. nxo„v euen xn,. <exnmvx. IONO :b4 :1:'. ux. RA. Hw rtr aOORRwooFm .[, °; .0 uxoscAPM>c 1 - I I I i r 1r�` '•'F �b yl L I \ . 1 i [ } j1 I [ 1 ral yx RE —RAN. • \, � rvicx as e9 �.6{ 1 ': = 1 1 M•.j.5� �..;'.t?A i Y � "r L li'i f v: gyp {� EMFNT • �` IRIMN r xO[xiMIS ,O w.aB.I 6 UTgltt all : I _ 1 1 i b 11"g • �� �I B�� I £ tf /� ,``� vx Alev EASEMENT _ , WI i// -',A ;}f,* 1 }tel ```•.1!'. uvn a wL.r arR n ' Y I1 � f / �bl I •aR NET LOT—: rxv aroalea yl i::io� ae . Isr RLooR I . i y i i �1."i I E wr�Pe.: FLOOR CALCIBLATIONvrt a' P—DIFFAFREE RE TO SETBALI[ DNE 31 I [ UMIRA . 5q MRE i •I' :� I1 y1 'x �� .11 ■c.N NOK9 IT nvv,. ILEA ANCE I. E 1 1iti -: Y1;�' ,1 — ” f asLA511�Yf6'TBO EASEMENT • 1 ita'Li..iill.0—a ' r F. O O _ L .NO Exv M nvvx. aaa ev.IT. 1O HHod141 • '""^.JF_�O @>WALNWAY .ur..vrt 't' �:•. ."'.'... rs --"-- ---" � <E>PALM EE o t R I I •�.. o'rw `,: CY ROvB MOIA LANE ­OK ■ I. .rigcyl .Ba eorr' N895? 4z W8$ i 00 EaPAPRNO i PRS -. _ • jnn:::: PROPERTY SETBACKSa DO IR 0.WOMi0: BED: ■ _ .'.�.'. ' d R Pe `enxsrii a[AN H [ xve a v' +. asT, O' ac' xAlC gl'ET T QMAIu ' Buri aid w vµlc ■ ' �> \ `~�-� .ti OE yp i'e 1' 4 ,a a0• l . <N> PORCH 33 BO.FT.•�+`\ Stirs. wWacx B �\ 2:77 RNaiRxBB ■ a IF. xrPeN e a, A~NO OOO a eitain AOROM x0 9 nNo uws oi0 I O�O,�(> ` 4\°u J ` lmalie E�fi lT. alBurONv11Y ;„VINO JURIBOIOTION Or THE Mata Da LUOE BUT ARE Nor LIMITev rv: �• \a RR3) ' R.IB.IB PLNMIAG RE.¢v I ■ IOa90IN ■ I 0. PRADO WAV ai ` �+ % Y i -W WAY O�ARCHITECTLBRAL ........ c»e µ s""c`[µ�CO 6ROPETMC x�:\a �g °9 _,I _Q PROPOSED SITE PLA ■ ??1�((FF[[rrO•Ee rucAee [Pnr SITE PLAN i BOuxvaRxv p• A'6 REALE: ITB'. IUC r I ° �E•pehev�n eBav[n "OURo J� im! M� €:a FINE "oo^€ ^s«.r.n. ■ E �y�a—nom FA-1.0 a.. PADvoa[o uxvea —ORO. ' rU ANue vN rx[ rRweur. +, a PROJECT•DATA i <N� CITY OF IM CUPERTINO SUBJECT COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 TELEPHONE: (408) 777-3308 • FAX: (408) 777-3333 CUPERTINO.ORG ADMINISTRATIVE HEARING STAFF REPORT Agenda Date: September 27, 2018 Development Permit and Architectural and Site Approval to consider allowing a 1,016 sq. ft. second floor addition to an existing office building for West Valley Community Services. (Application(s): DP -2018-06 and ASA -2018-07; Applicant: Josh Selo; Project Location: 10104 Vista Drive; A.P.N.: 316-24-059) RECOMMENDED ACTION That the Hearing Officer adopt the Draft Resolutions to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve the Development Permit (DP -2018-06) and Architectural and Site Approval (ASA -2018-07) (See Attachments 1 and 2). DISCUSSION Project Data: Special Area/Neighborhood Heart of the City Special Area and Central Stevens Creek Boulevard Subarea General Plan Designation Residential Medium 10-20 dwelling units per acre Zoning Designation P (CG, Res) Existing Proposed Lot Size 51,270 sq. ft. (1.18 acres) No Change Lot Coverage 33% No Change WVCS Total (sq. ft.) 5,177 6,193 First Floor (sq. ft.) 3,284 No Change Second Floor (sq. ft.) 1,893 2,909 Total Building Height 28' No Change Project Consistency With: General Plan Yes Zoning Yes Environmental Review Categorically Exempt per Section 15301 of the California Environmental Quality Act (CEQA) Background: Site Description The property is located approximately 200 feet north of the Stevens Creek Boulevard and Vista Drive intersection on the east side of Vista Drive. The property is located within the Central Stevens Creek Boulevard Subarea of the Heart of the City Special Area (See Figure 1). The surrounding uses are comprised of townhomes, with single family residential uses beyond, to the north; commercial, commercial office, and office to the south; office, commercial office, and residential uses to the east; commercial office and higher density (townhomes) to the west. Previous Approvals A. Figure 1: Aerial The Planning Commission approved a Use Permit (U-2000-14) and a Heart of the City Exception (EXC-2000-10) in December 2000 to permit the construction of a 5,225 square .� Figure 2: Site Configuration 1-11 WVCS Office Building [2] Residences 3] Carports administrative office building/residential community building, 12 one -bedroom and 12 two-bedroom affordable apartments with 52 shared residential and office parking spaces on a 1.18 -acre vacant lot (See Figure 2). Specifically, the office and community building were permitted to be used for general office uses and all other associated programming and services, offered by West Valley Community Services' (WVCS). WVCS provides services that include a food pantry, clothing distribution, emergency financial assistance, financial coaching, family support, access to public health and food assistance benefits, case management, and referral services. Analysis: Application Requests The applicant, Josh Selo, Executive Director of WVCS, is requesting that the City permit the addition of 1,016 sq. ft. to the second floor of the existing WVCS building. WVCS is not increasing staffing, programming, modifying the uses nor the hours of operation. As part of this proposal, West Valley will be reconfiguring the internal space of the entire building to provide the following operational improvements: ■ Relocate the existing conference room to accommodate all required staff and board members at meetings ■ Convert existing cubicle space into additional food pantry storage to address community need ■ Utilize the entire food pantry area for services, rather than reserving some as storage area, to allow for more clients to walk through the pantry at one-time ■ Improve space efficiency of meeting rooms and office space Architectural Design The addition will extend the second floor to the west (toward Vista Drive) to accommodate for three new offices and to the north (internal) for the new conference Area (in sq. ft.) Existing Net Change Proposed Food Pantry 683 275 958 Staff and Client Meeting Rooms 1,208 575 1,783 Staff Offices 1,239 166 1,405 Reception 610 - 610 Resident Laundry 87 - 87 Other: Corridors, storage,, restrooms, etc. 1,350 - 1,350 TOTAL 5,177 1,016 6,193 Architectural Design The addition will extend the second floor to the west (toward Vista Drive) to accommodate for three new offices and to the north (internal) for the new conference room. It will be located above a portion of the building that is currently single -story and will be within the footprint of the existing building. In order to maintain architectural integrity, the proposal will maintain the existing horizontal and vertical wood siding, roof brackets, and composition shingle roof on the addition; and install a new wood trellis on the first -story portion below the area where three new offices are proposed on the second floor. The trellis will provide architectural relief to the western elevation that faces Vista Drive and will match the existing trellis to the north elevation. Vehicular and Bicycle Parking With the original Use Permit, the development was approved with 52 stalls when the number of stalls required per the Municipal Code was 66 stalls (i.e. less than the Parking Ordinance standard of two stalls/unit.) A parking management plan was required to ensure that there would not be any impacts to the neighborhood (See Attachment 5 for WVCS Parking Management Plan). In addition, a condition of approval was added to the resolution that, at the City's discretion, WVCS may be required to modify their uses or revise the parking management plan, if the use of the office space proved to be too intense and affected the neighborhood. However, no changes have been required so far since no impacts have been felt. At this time, WVCS is proposing to add square footage without intensifying the programming but is not proposing additional parking. For Planned Development zones, such as this property, reduced parking standards may be approved if validated through a parking study that determines that adequate parking has been provided for the proposed uses. To that end, Hexagon Transportation Consultants, was retained by the City to conduct a parking study to evaluate on-site parking demand and availability. The parking study was conducted on three weekdays in April (See Attachment 4). The parking study determined that the highest parking demand at the site was 36 stalls. Since the site has 52 spaces, there were 15 vacant spaces still available at the site at that time. Therefore, the site is adequately parked for the uses on the site. As previously noted, the City has the authority to re-evaluate the uses or the parking at the site, in the event that there are neighborhood impacts. Environmental Review This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15301(e) — Existing Facilities because the exemption applies to the addition of up to 10,000 sq. ft. in an area where all public services and facilities are available to allow for maximum development permissible in the General Plan and the project is not located in an environmentally sensitive area. Other Department/Agency Review The City's Public Works Department; Building Division; Environmental Programs Division; and the Santa Clara County Fire Department reviewed the request and have no objections to the project. Environmental Services' comments are incorporated as conditions of approval. PUBLIC NOTICING AND COMMUNITY OUTREACH The following table is a brief summary of the noticing done for thisproject: Notice of Public Meeting & Site Signage Agenda • Site Signage (10 days prior to hearing) • Posted on the City's official notice • 8 notices mailed to property owners bulletin board (one week prior to hearing) adjacent to the project site (10 days • Posted on the City of Cupertino's Web prior to hearing) site (one week prior to hearing) No public comments were received at the time of production of this staff report. PERMIT STREAMLINING ACT This matter is adjudicatory and is subject to the Permit Streamlining Act (Government Code Section 65920 — 65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received: June 28, 2018; Deemed Incomplete: July 27, 2018 Project Resubmitted: September 9, 2018; Deemed Complete: September 11, 2018 The City has 60 days (until November 10, 2018) to make a decision on the project. CONCLUSION Staff recommends approval of the Development Permit and Architecture and Site Approval because the project is consistent with the General Plan, and zoning ordinances, and conforms to Chapters 19.144 and 19.168 of the Cupertino Municipal Code. Additionally, all of the findings for approval of the proposed project, consistent with the Cupertino Municipal Code, may be made as reflected in the Draft Resolutions. NEXT STEPS The permit will be effective 14 calendar days from the date of the hearing. The decision of the Administrative Hearing Officer is final, unless appealed within 14 calendar days from the date of the hearing. The applicant may apply for building and/or other permits with the City at the end of the appeal period. This approval is valid until September 27, 2020. The applicant may apply for a one-time one-year extension before the approval expires. Prepared by- Ellen Yau, Associate Planner Reviewed and Approved by: Piu Ghosh, Principal Planner ATTACHMENTS 1. Draft Resolution for DP -2018-06 2. Draft Resolution for ASA -2018-07 3. Plan Set 4. Parking Study 5. Vista Village Parking Management Plan DP -2018-06 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 103t7.111Wa 01601RUKOM OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING A DEVELOPMENT PERMIT TO ALLOW FOR A 1,016 SQ. FT. SECOND FLOOR ADDITION LOCATED AT 10104 VISTA DRIVE (APN 316-24-059) SECTION I: PROTECT DESCRIPTION Application No.: DP -2018-06 Applicant: Josh Selo (West Valley Community Services) Location: 10104 Vista Drive SECTION II: FINDINGS FOR ARCHITECTURAL AND SITE APPROVAL PERMIT: WHEREAS, the City of Cupertino received an application for a Development Permit to consider allowing a 1,016 sq. ft. second story addition, as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting in regard to the application; and WHEREAS, the project is determined to be exempt from the California Environmental Quality Act (CEQA); and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: 1. The proposed development, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The current building is a two-story administrative office for West Valley Community Services and is located towards the interior of the property with one elevation facing Vista Drive and visible from the public right-of-way. The zoning district allows the construction Draft Resolution DP -2018-06 September 27, 2018 Page 2 of building of up to 45 feet in height while the existing building is measured at 28'. The proposal is a second story addition, that will not further increase the height of the building but will modify the western and northern elevation. However, even with the addition there will continue to be sufficient setback from adjacent properties. In addition, the proposed addition is located directly above an existing single story portion of the building and will not increase the existing footprint of the building. Therefore, the proposal will not be detrimental or injurious to property or improvements in the vicinity. 2. The proposed development will be located and conducted in a manner in accord with the Cupertino Comprehensive General Plan and the purpose of this title and complies with the California Environmental Quality Act (CEQA). The proposed development is in conformance with the Cupertino General Plan and the proposal has met the development standards as defined by the Heart of the City Specific Plan and the City Municipal Code such as heights and setbacks. The site is within a Planned Development Zoning District that supports flexibility in parking standards. The parking study supports the proposed addition and concludes that additional parking stalls are not required for this project. Therefore, the proposed development is consistent with the Cupertino General Plan. The project is categorically exempt from CEQA under Section 15301 since it is an addition to an existing structure of less than 10,000 sq. ft. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff's report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 4 thereof,: The application for a Architectural and Site Approval, Application no. DP -2018-06 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Hearing record concerning Application no. DP -2018-06 as set forth in the Minutes of the Administrative Hearing Meeting of September 27, 2018 and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set drawn by Adaptive Architecture entitled "West Valley Community Services Office Addition" consisting of seven (7) sheets labeled as Draft Resolution DP -2018-06 September 27, 2018 Page 3 A0.1, ALL A1.2, A2.1, A2.2, A3.1, and A4.1, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROTECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 4. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. ASA -2018-07 shall be applicable to this approval. 5. PREVIOUS APPROVAL CONDITIONS The conditions of approval contained in file nos. U-2000-14 and EXC-2000-10 shall be applicable to this approval. 6. BUILDING AND FIRE CODE The applicant shall apply for and obtain building permits to allow the construction of the approved project. The applicant shall provide information and plans to allow the Building Official and the Fire Marshall or their designee that the proposed plans comply with Building and Fire Codes in effect at the time of application for a building permit. 7. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS a) All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. b) Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c) Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during the nighttime period as defined in Section 10.48.053(b) of the Municipal Code. Draft Resolution DP -2018-06 September 27, 2018 Page 4 d) Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of the Cupertino Municipal Code. e) Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f) The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. g) The applicant shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated 8. DUST CONTROL The following construction practices shall be implemented during all phases of construction for the proposed project to prevent visible dust emissions from leaving the site: a) Water all active construction areas at least twice daily and more often during windy periods to prevent visible dust from leaving the site; active areas adjacent to windy periods; active areas adjacent to existing land uses shall be kept damp at all times, or shall be treated with non-toxic stabilizers or dust palliatives. b) Cover all trucks hauling soil, sand, and other loose materials or require all trucks to maintain at least 2 feet of freeboard; c) Pave, apply water at least three times daily, or apply (non-toxic) soil stabilizers on all unpaved access roads, parking areas and staging areas at construction sites. d) Sweep streets daily, or more often if necessary (preferably with water sweepers) if visible soil material is carried onto adjacent public streets. e) The applicant shall incorporate the City's construction best management practices into the building permit plan set. 9. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 10. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, Draft Resolution DP -2018-06 September 27, 2018 Page 5 the "indemnified parties") from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys' fees and costs within 30 days following receipt of invoices from City. Such attorneys' fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 11. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 -day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 27th day of September, 2018 at a noticed Administrative Hearing of the City of Cupertino, State of California, held by the Administrative Hearing Officer, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: Ellen Yau Associate Planner Benjamin Fu Assistant Director of Community Development ASA -2018-07 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 103t7.111Wa 01601RUKOM OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL PERMIT TO ALLOW FOR A 1,016 SQ. FT. SECOND FLOOR ADDITION LOCATED AT 10104 VISTA DRIVE (APN 316-24-059) SECTION 1: PROTECT DESCRIPTION Application No.: ASA -2018-07 Applicant: Josh Selo (West Valley Community Services) Location: 10104 Vista Drive SECTION II: FINDINGS FOR ARCHITECTURAL AND SITE APPROVAL PERMIT: WHEREAS, the City of Cupertino received an application for an Architectural and Site Approval to consider allowing a 1,016 sq. ft. second story addition, as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting in regard to the application; and WHEREAS, the project is determined to be exempt from the California Environmental Quality Act (CEQA); and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: 1. The proposed development, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The current building is a two-story administrative office for West Valley Community Services and is located towards the interior of the property with one elevation facing Vista Drive and visible from the public right-of-way. The zoning district allows the construction Draft Resolution ASA -2018-07 September 27, 2018 Page 2 of building of up to 45 feet in height while the existing building is measured at 28'. The proposal is a second story addition, that will not further increase the height of the building but will modify the western and northern elevation. However, even with the addition there will continue to be sufficient setback from adjacent properties. In addition, the proposed addition is located directly above an existing single story portion of the building and will not increase the existing footprint of the building. Therefore, the proposal will not be detrimental or injurious to property or improvements in the vicinity. 2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. The scale of the building will be maintained with no changes to the height of the building. Although the addition will increase the floor area of the building and increase the volume, the proposal maintains varied wall and roof setbacks that will provide architectural articulation. Additionally, architectural features such as consistent roof brackets and locations, and the installation of a new wood trellis will further enhance the addition and mitigate the overall building mass. b) In order to preserve design harmony between new and existing building and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments, and provide shielding to prevent spill-over light to adjoining property owners. The new addition will utilize the existing horizontal and vertical paneling patterns to preserve design harmony and integrity. The location of utility and storage areas remain unchanged and located at the rear of the building. Furthermore, existing trees in the front are preserved and will help to mitigate impacts of the addition to the public right-of-way. Draft Resolution ASA -2018-07 September 27, 2018 Page 3 c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. Signage approval is not included in this application and the applicant does not wish to propose any new signage. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. Additional windows are proposed on the second floor, but the height of the windows are six feet in height measured from finished floor to window sill and will, therefore, not create privacy issues to the existing residences to the north. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff's report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 4 thereof,: The application for a Architectural and Site Approval, Application no. ASA -2018-07 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Hearing record concerning Application no. ASA -2018-07 as set forth in the Minutes of the Administrative Hearing Meeting of September 27, 2018 and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set drawn by Adaptive Architecture entitled "West Valley Community Services Office Addition" consisting of seven (7) sheets labeled as A0.1, A1.1, A1.2, A2.1, A2.2, A3.1, and A4.1, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROTECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property Draft Resolution ASA -2018-07 September 27, 2018 Page 4 size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 4. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. DP -2018-06 shall be applicable to this approval. 5. PREVIOUS APPROVAL CONDITIONS The conditions of approval contained in file nos. U-2000-14 and EXC-2000-10 shall be applicable to this approval. 6. EXTERIOR BUILDING MATERIALS/TREATMENTS The final building exterior plan shall closely resemble the details shown on the original approved plans. Final building exterior treatment plan (including but not limited to details on exterior color, materials, architectural treatments, doors, windows, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits to ensure quality and consistency. Any exterior changes determined to be substantial by the Director of Community Development shall either require a modification to this permit or a new permit based on the extent of the change. 7. SCREENING All mechanical and other equipment on the building or on the site shall be screened so they are not visible from public street areas or adjoining developments. Screening materials/colors shall match building features and materials. The height of the screening shall be taller than the height of the mechanical equipment that it is designed to screen. The location of equipment and necessary screening shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. 8. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. Draft Resolution ASA -2018-07 September 27, 2018 Page 5 9. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the "indemnified parties") from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys' fees and costs within 30 days following receipt of invoices from City. Such attorneys' fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 10. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 -day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 27th day of September, 2018 at a noticed Administrative Hearing of the City of Cupertino, State of California, held by the Administrative Hearing Officer, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: Ellen Yau Associate Planner Benjamin Fu Assistant Director of Community Development ABBREVIATIONS DRAWIN N WEST VALLEY COMMUNITY SERVICES G SYMBOL LEGEND PROJECT NORTH COLUMN REFERENCE GRIDS 8,23 = COLUMN DESIGNATION ELEVATION 4 4 = ELEVATION DESIGNATION A5.1 A5.1 = REFERENCE DRAWING NUMBER ARROW INDICATES DIRECTION OF VIEW BUILDING SECTION C = SECTION DESIGNATION - - A5.2 = REFERENCE DRAWING NUMBER A5.2 ARROW INDICATES DIRECTION OF VIEW WALL SECTION E _ _ E = SECTION DESIGNATION A5.3 A5.3 = REFERENCE DRAWING NUMBER ARROW INDICATES DIRECTION OF VIEW DETAIL 10 1 0 = DETAIL DESIGNATION 8 3 8.3 = REFERENCE DRAWING NUMBER LOBBY CODE ANALY515 E1 6 LOBBY = ROOM NAME 900 E I = OCCUPANCY GROUP 45 G = SPACE USE - REF SPACE USE SCHEDULE 900 = FLOOR AREA - SQUARE FEET 45 = OCCUPANT LOAD (CDC TABLE I 0-A) = OCCUPANT LOAD SIGN REQUIRED WHEN NOTED - ( CDC SEC 1002.3 ) REF SIGNAGE SCHEDULE FFE 01-o° LEVEL LINE, CONTROL POINT FFE 0'-0" = ELEVATION MATCH LINE AND AREA Q DESIGNATOR SHADED PORTION IS THE SIDE CONSIDERED CENTER LI N E5, ELOOK LINES AND LEVEL LINES SECTION LINES PROPERTY LINES, BOUNDRY LINES AND MATCH LINES - - - - HIDDEN CONSTRUCTION FEATU RE BREAKS OF BUILDING COMPONENTS REV15ION A3 = REVISION NUMBER O GLAZED OPENING OR WIN DOW TYPE 5o DOOR IDENTIFICATION 50 = DOOR NUMBER OFFICE ADDITION 10 I 04 VISTA DRIVE CUPERTINO, CA 95014 APPLICABLE CODES 201 G BUILDING STANDARDS ADMINISTRATIVE CODE PART 1, TITLE waGORNE1 AS RH 24 C.C.R. 201 G CALIFORNIA BUILDING CODE (CBC) PART 2, TITLE 24 C.C.R. „.�.,,.. I (20 1 5 INTERNATIONAL BUILDING CODE (IBC) W/ CALIFORNIA AMENDMENTS. 201 G CALIFORNIA PLUMBING CODE (CPC) ,IHahWed �, 201 G CALIFORNIA MECHANICAL CODE (CMC) 201 G CALIFORNIA ELECTRICAL CODE (CEC) 201 G CALIFORNIA FIRE CODE (CFC) 201 G CALIFORNIA GREEN BUILDING CODE } 201 G CALIFORNIA ENERGY CODE CUPERTINO MUNICIPAL CODE PROJECT TEAM OWNER WEST VALLEY COMMUNITY SERVICES CONTACT: JOSH SELO 10 104 VISTA DR CUPERTINO, CA 95014 (408) 954-G 1 13 ARCHITECT ADAPTIVE ARCHITECTURE CONTACT: JANICE YEH 201 1 1 STEVENS CREEK BLVD SUITE 270 CUPERTINO, CA 95014 (408) 8G5-1089 SCOPE Of WORK THE PROJECT SCOPE OF WORK INCLUDES THE FOLLOWING: 1. A 1,0 1 G SQ. IT. ADDITION TO EXISTING 2-5TORY ADMINISTRATIVE BUILDING (CCS BLDG). CODE ANALYSIS A. BUILDING CODE ANALYSIS: TYPE OF CONSTRUCTION: V -B OCCUPANCY TYPE: B AUTOMATIC FIKE SPRINKLER? YES BASIC ALLOWABLE AREA PER CBC TABLE 503: 27,000 SF PROPOSED BUILDING AREA: G, 193 SF B. PLUMBING FIXTURE CALCULATIONS (CPC TABLE 422. 1): NUMBER OF OCCUPANTS PER CPC TABLE A: G, 193 / 200 = 31 OCCUPANTS o PLUMBING FIXTURES: (BASED ON I G MALE * I G FEMALE OCCUPANTS) And F.O.S. Face of Studs SECT. Section L Angle FT. Foot or Feet SH Shelf @ At FTG. Footing SHT. Sheet CL 2 FW Fire Water SHWK. Shower NO Centerline BY a jW10 SIM. Similar -0 Diameter or GA. Gauge SPEC. Specification A I I Round GALV. Galvanized SQ. Square d Penny (Nails) G. D. Grab Bar SST. Stainless # Pound GI Galvanized rtrtay' - Steel (N) Ing Iron STD. Standard New GL. Glass STL. Steel (K) Relocated GND. Ground STOR. Storage ACC Accessible GK. Grade STRUCT. Structural A/C Air GS Galvanized SUSP, Suspended s Conditioning Steel SYM. Symmetrical A.C. Asphaltic GYP. Gypsum SYS. System Conc. ACOUS. Acoustical H. B. Hose Bibb T. 13. Towel Bar A. D. Area Drain H.C. Hollow Core TEL. Telephone -ADJ. Adjustable HDR. Header TER. Terrazzo ALT. Alternate HDWD. Hardwood THK. Thick ALUM. Aluminum HDWK. Hardware T.* G. Tongue APPROX. Approximate H. m. Hollow Metal Groove ARCH. Architectural HORIZ. Horizontal T.O.C.Top of Curb HT. Height T.O.C. D. Top of BD. Board Concrete BITUM, Bituminous 1. D. Inside Deck BLDG. Building Diameter T.O.P. Top of BILK. Block INSUL. Insulation Pavement / BLKG. Blocking INT. Interior Top of B. M. Bench Mark Parapet BFP. Backflow JAN. Janitor T. 0. R. D. Top of Roof Preventer Deck BOT. Bottom KIT. Kitchen T.O.S. Top of Sheathi ngg CAB. Cabinet LAB. Laboratory T.O.W. Top of Wall C. B. Chalk Board LAM. Laminate TRD. Tread CEM. Cement LAV. lavatory T.S.W. Top of CER. Ceramic LKR. Locker Sidewalk C. 1. Cast Iron LT. Light T.V. Television C.J. Const. Joint TYP. Typical C. L. Chain Link MAINT. Maintenance CLG. Ceiling MAT. Material U. L. Underwriters CLK. Clear MAX. Maximum Laboratory CNTR. Counter M. D. Machine Bolt U.N.O. Unless Noted COL. Column M.D.F. Medium Otherwise CONC. Concrete Density U.O.N. Unless CONN. Connection Fiberboard Otherwise CONST. Construction MECH, Mechanical Noted CONT. Continuous MEMS. Membrane COKK. Corridor MEZZ. Mezzanine V.C.T. Vinyl CPT. Carpet MFK. Manufacturer Composition CTSK. Countersunk MH. Manhole Tile CTR. Center MIN. Minimum VERT. Vertical CW. Cold Water MIR. Mirror VEST. Vestibule MISC. Miscellaneous V.T.R. Vent Through DBL. Double M. 0. Masonry Roof DEPT. Department Opening V.W.C. Vinyl Wall D.F. Drinking MTD. Mounted Covering Fountain / MTL. Metal Douglas Fir MUL. Mullion W West DIA. Diameter w/ With DIAG. Diagonal N North W.C. Water Closet DIM, Dimension N.I.C. Not In WD. Wood DISP. Dispenser Contract WDW. Window -0N. Down No. or # Number W/O Without DK. Door NOM Nominal W.S. Wood Screw DS. Downspout N.T.S. Not To Scale WT. Weight D.S.P. Dry StandPipe W.W.F. Welded Wire DTL. Detail OD Outside Fabric DWG. Drawing Diameter DWK. Drawer O.A. Overall O.C. On Center EA. Each OFF. Office E.J. Expansion OPP. Opposite Joint OPER Operable EL. Elevation ELEC. Electrical P. L.C.C. Plastic Laminate ELEV. Elevator Covered EMEK. Emergency Casework ENCL. Enclosure PA Plantingg Area EQ. Equal PH Panic I�ardware EQPT. Equipment PLAS. Plaster E.W. Each Way PLYWD. Plywood EXH. Exhaust PNL. Panel EXP. Expansion PK. Pair EXT. Exterior PT. Point P. LAM. Plastic Laminate F.A. Fire Alarm F.D. Floor Drain Q.T. Quarry Tile FDN. Foundation F.E. Fire R Riser Extinguisher K. D. Roof Drain FEC Fire REF. Reference Extinguisher KEFK. Kefrigerator Cabinet REG. Kegister F.F. Finish Floor REINF. Reinforced F.G. Finish Grade REQ. Required F.H. Flat Head KESIL. Kesilient FHC Fire Hose Cab. R.H Round Head FIN. Finish RM. Room FLASH. Flashing R.O. Rough Opening FLK. Floor RWD. Redwood FLUOK. Fluorescent F.O.C. Face of Conc. S. South F.O.F. Face of Finish S.C. Solid Core F.O.M. Face of SCHED. Schedule Masonry DRAWIN N WEST VALLEY COMMUNITY SERVICES G SYMBOL LEGEND PROJECT NORTH COLUMN REFERENCE GRIDS 8,23 = COLUMN DESIGNATION ELEVATION 4 4 = ELEVATION DESIGNATION A5.1 A5.1 = REFERENCE DRAWING NUMBER ARROW INDICATES DIRECTION OF VIEW BUILDING SECTION C = SECTION DESIGNATION - - A5.2 = REFERENCE DRAWING NUMBER A5.2 ARROW INDICATES DIRECTION OF VIEW WALL SECTION E _ _ E = SECTION DESIGNATION A5.3 A5.3 = REFERENCE DRAWING NUMBER ARROW INDICATES DIRECTION OF VIEW DETAIL 10 1 0 = DETAIL DESIGNATION 8 3 8.3 = REFERENCE DRAWING NUMBER LOBBY CODE ANALY515 E1 6 LOBBY = ROOM NAME 900 E I = OCCUPANCY GROUP 45 G = SPACE USE - REF SPACE USE SCHEDULE 900 = FLOOR AREA - SQUARE FEET 45 = OCCUPANT LOAD (CDC TABLE I 0-A) = OCCUPANT LOAD SIGN REQUIRED WHEN NOTED - ( CDC SEC 1002.3 ) REF SIGNAGE SCHEDULE FFE 01-o° LEVEL LINE, CONTROL POINT FFE 0'-0" = ELEVATION MATCH LINE AND AREA Q DESIGNATOR SHADED PORTION IS THE SIDE CONSIDERED CENTER LI N E5, ELOOK LINES AND LEVEL LINES SECTION LINES PROPERTY LINES, BOUNDRY LINES AND MATCH LINES - - - - HIDDEN CONSTRUCTION FEATU RE BREAKS OF BUILDING COMPONENTS REV15ION A3 = REVISION NUMBER O GLAZED OPENING OR WIN DOW TYPE 5o DOOR IDENTIFICATION 50 = DOOR NUMBER OFFICE ADDITION 10 I 04 VISTA DRIVE CUPERTINO, CA 95014 APPLICABLE CODES 201 G BUILDING STANDARDS ADMINISTRATIVE CODE PART 1, TITLE waGORNE1 AS RH 24 C.C.R. 201 G CALIFORNIA BUILDING CODE (CBC) PART 2, TITLE 24 C.C.R. „.�.,,.. I (20 1 5 INTERNATIONAL BUILDING CODE (IBC) W/ CALIFORNIA AMENDMENTS. 201 G CALIFORNIA PLUMBING CODE (CPC) ,IHahWed �, 201 G CALIFORNIA MECHANICAL CODE (CMC) 201 G CALIFORNIA ELECTRICAL CODE (CEC) 201 G CALIFORNIA FIRE CODE (CFC) 201 G CALIFORNIA GREEN BUILDING CODE } 201 G CALIFORNIA ENERGY CODE CUPERTINO MUNICIPAL CODE PROJECT TEAM OWNER WEST VALLEY COMMUNITY SERVICES CONTACT: JOSH SELO 10 104 VISTA DR CUPERTINO, CA 95014 (408) 954-G 1 13 ARCHITECT ADAPTIVE ARCHITECTURE CONTACT: JANICE YEH 201 1 1 STEVENS CREEK BLVD SUITE 270 CUPERTINO, CA 95014 (408) 8G5-1089 SCOPE Of WORK THE PROJECT SCOPE OF WORK INCLUDES THE FOLLOWING: 1. A 1,0 1 G SQ. IT. ADDITION TO EXISTING 2-5TORY ADMINISTRATIVE BUILDING (CCS BLDG). CODE ANALYSIS A. BUILDING CODE ANALYSIS: TYPE OF CONSTRUCTION: V -B OCCUPANCY TYPE: B AUTOMATIC FIKE SPRINKLER? YES BASIC ALLOWABLE AREA PER CBC TABLE 503: 27,000 SF PROPOSED BUILDING AREA: G, 193 SF B. PLUMBING FIXTURE CALCULATIONS (CPC TABLE 422. 1): NUMBER OF OCCUPANTS PER CPC TABLE A: G, 193 / 200 = 31 OCCUPANTS o PLUMBING FIXTURES: (BASED ON I G MALE * I G FEMALE OCCUPANTS) o DRINKING FOUNTAIN: I REQUIRED, I WATER COOLER PROVIDED VICINITY MALE FEMALE Ma.PJF'k W.C. URINAL LAV W.C. LAV REQUIRED I 1 1 2 1 PROVIDED 2 0 2 2 2 o DRINKING FOUNTAIN: I REQUIRED, I WATER COOLER PROVIDED VICINITY MAP 10104 Yala6rne °""`�y Ma.PJF'k rructaa I g Y'a:..-imi: N (: �.�JCr; nJ $ PANAMA PARK PLANNING 5UBMITTAL � �md'�� a°° 'le-Icm Jk STRP�M6ERRY T 17 CALVERT D'DZ'r LM A �IMDk A0. I MIMITZ a PRELIM REVIEW NO ^ BY a jW10 Ray-rtr P7ik RANtHD �� 141 fYFRRR a41t A I I JGAOUIM MILLER WEST VALLEY ono [Gra -, . BIROLANO C lehem Pe -k l)rbfaMH05r.hnrJ T WEFT SAN JDEE MEiGH90AS R��& A 1.2 F Ad 59 Rand, t"Wl T �ry KaY.ar Fcirnanunla Smio � Y ]rcrxt. Rarnen Me6C91,� A2.1 .. ° i�di�iile Lcxro� A2.2 � R A3.1 Val wswppirc Mgt � A4.1 1 CE ✓tin2B �y 44M4IP FMde MdO,,; 10104 Yala6rne °""`�y Ma.PJF'k rructaa Y r�IrTv CC- W.ty (: �.�JCr; nJ ax.n. c.A awa 3c+a�{rsklhd PLANNING 5UBMITTAL Edw�•ayt on a°° 'le-Icm Jk STRP�M6ERRY T uepot i.. CALVERT D'DZ'r LM A �IMDk Q Jdlp-pep Park a PRELIM REVIEW NO ^ BY a jW10 (K% RANtHD �� Mots N�NF.FO `"p, CmrN81tl6p9rt. FEENOONAOA Ma.PJF'k Q 9/7/18 r�IrTv Q 6/29/18 PLANNING 5UBMITTAL g a°° 'le-Icm Jk STRP�M6ERRY 0 uepot i.. PARK Q Jdlp-pep Park a PRELIM REVIEW NO DATE BY DESCRIPTION (K% 141 fYFRRR a41t ar..l...<.. •:,,J,s, JGAOUIM MILLER WEST VALLEY t:;,:n C lehem Pe -k l)rbfaMH05r.hnrJ T WEFT SAN JDEE R��& rtrtay' - C}LpHiRY LANE RAINBOW RR{7{SKVaLF -CHA NTF HATHAWA AMC gkr; ;gg�IA CAS T R 11 K6Min ,• s MoranPark SARI4TOGA i WOODS e SaralKaCi nk:yClub - BROOKVIEW N PROJECT SITE PARKING AN ALY5 I S EXISTING FACILITY USE AREA PARKING NO. OF STALLS (SQ. FT.) RATIO NEEDED OFFICE (NET) 4, 1 G9 1/285 15 MULTI -FAMILY 2 PER 2-15K 3G RESIDENTIAL I PER I -BR PARKING STALLS NEEDED 52 TOTAL PARKING STALLS PROVIDED 1 52 PROPOSED FACILITY USE AREA PARKING NO. OF STALLS (SQ. FT.) RATIO NEEDED DRAWING INDEX ARCHITECTURAL PROJECT INFO, DRAWING INDEX, RENDERING SITE PLAN ENLARGED SITE PLAN FIRST FLOOR EXISTING $ PROPOSED PLANS SECOND FLOOR EXISTING * PROPOSED PLANS SECTIONS $ ELEVATIONS EXISTING PROPOSED ROOF PLANS PROJECT DATA 1. ASSESSOR'S PARCEL NO 3. ZONING: 4. LAND USE: 5. LOT AREA: G. FLOOK AREA (EXISTING): 7. FLOOR AREA (PROPOSED) OFFICE (NET) 4,843 1/285 17 8. LOT COVERAGE: 9. CONSTRUCTION TYPE MULTI -FAMILY _ 2 PER 2 -BR 3G RESIDENTIAL I PER 1-13K 10. SETBACKS: PARKING STALLS NEEDED 53 1 1. BUILDING HEIGHT: TOTAL PARKING STALLS PROVIDED 1 52 BICYCLE PARKING CCS BLDG AREA PARKING (SQ. FT.) RATIO G, 193 1/1,250 NO. OF STALLS NO. OF STALLS NEEDED NEEDED 5 9 3 1 G-24-0594 HEART OF THE CITY HEART OF THE CITY SPECIAL AREA 5 1,270 SQ FT (1. 18 ACRES) BLDG I 3,446 SF BLDG 2 3,444 SF BLDG 3 9,924 SF CCS BLDG 5,177 SF TOTAL 2 1,993 SF - ADDITION OF OFFICES AND CONFERENCE ROOM ON THE 2ND FLOOR OF THE CCS BUILDING, APPROXIMATELY 1 ,0 IG SQ. FT. CCS BLDG WILL BE G, 193 SF TOTAL FLOOR AREA WILL BE 23,009 SF %sm. V -B SEE DIMENSIONS ON A I. I A I .2 28' (2-5TOKY) Rc S @ Janice T. Yeh @ C-33243 41 • 6 Rsr. ;ate: 0713 19 ADAPTIVE ARCHITECTURE 20111 STEVENS CREEK BLVD SUITE 270 CUPERTINO, CA 95014 (408) 865-1089 0 CHECKED: DATE: SCALE: AS NOTED Q 9/7/18 PLANNING 5UBMITTAL Q 6/29/18 PLANNING 5UBMITTAL 0 3/23/16 PRELIM REVIEW 0 12/16/17 PLANNING MTG Q 6/16/17 PRELIM REVIEW NO DATE BY DESCRIPTION REVISIONS DRAWN: JY CHECKED: DATE: SCALE: AS NOTED PROJECT NUMBER: PROJECT INFO, DRAWING INDEX, & RENDERING DRAWING �O ■ NUMBEK: 5—BIKE CAPACITY BICYCLE RACK ON NEW 7'X7CONC PAD R/ Q J (E) PYRU5 CALLERIAN/ CHANTICLEER', TYP. @ STREET FRONTAGE ALL EXTERIOR STORM DRAIN INLETS ON THE PARCEL MUST BE CLEARLY MARKED WITH "NO DUMPING FLOWS TO CREEK" OR "NO DUMPING FLOWS TO BAY'. COORDINATE WITH ALEX WYKOFF WITH CITY OF CUPERTINO PUBLIC WORKS DEPARTMENT ON DRAIN INLET MARKERS. 2. A COMPLETED CONSTRUCTION AND DEMOLITION (C*D) WA5TE MANAGEMENT PLAN MUST BE SUBMITTED AT THE TIME OF DEMOLITION AND/OR BUILDING PERMIT ISSUANCE. IF BOTH DEMOLITION AND CONSTRUCTION PERMITS WILL BE ISSUED, C*D WASTE MANAGEMENT MUST BE SUBMITTED FOR EACH PERMIT. IF THE PERMIT APPLICANT AND/OR THEIR CONTRACTOR AND ANY SUBCONTRACTOR WORKING ON THE PROJECT SELF -HAULS THE C*D MATERIAL, A WASTE MANAGEMENT REPORT MUST BE SUBMITTED PRIOR TO FINAL APPROVAL OF THE DEMOLITION / BUILDING PERMIT DEMONSTRATING A MINIMUM OF G5% OF THE CSD WASTE HAS BEEN DIVERTED FROM LANDFILL AND RECYCLED. PLEASE NOTE THAT C*D DEBRIS BOX SERVICE MAY ONLY BE OBTAINED FROM RECOLOGY, THE CITY'S FRANCHISED WASTE HAULER. CSD RECYCLING INFORMATION AND REPORTS MAY BE DOWNLOADED AT WWW.CUPERTINO.ORG/GREENDEV GENERAL NOTES 5ITE PLAN I I I Gil = 11-011 N Janice T. Yeh i C-33243 Q (3) Rsr. k 07/31/19 ADAPTIVE ARCHITECTURE 20111 STEVENS CREEK BLVD SUITE 270 CUPERTINO, CA 95014 (408) 865-1089 DRAWN:JY CHECKED: DATE: SCALE: AS NOTED A9/7/18 PLANNING 51JBMITTAL A G/29/18 PLANNING 5UBMITTAL A13/23/1(5 PRELIM REVIEW Al2/1 G/ 17 PLANNING MTG AG/1 G1 17 PRELIM REVIEW NO DATE BY DESCRIPTION REV1510N5 DRAWN:JY CHECKED: DATE: SCALE: AS NOTED PROJECT NUMBER: SITE PLAN DRAWING Al. 1 J • JaniceT. Yeh C-33243 g Ren, Date: 07/31/19 = '. �O ADAPTIVE ARCHITECTURE 20111 STEVENS CREEK BLVD SUITE 270 CUPERTINO, CA 95014 (408) 865-1089 DKAWN:JY CHECKED: DATE: SCALE: AS NOTED A9/7/18 PLANNING SUBMITTAL AG/29/1 6 PLANNING SUBMITTAL A3/23/1(5 PRELIM REVIEW Al2/1 G1 17 PLANNING MTG A G/ 16/ 17 PRELIM REVIEW NO DATE BY DESCRIPTION REVISIONS DKAWN:JY CHECKED: DATE: SCALE: AS NOTED PROJECT NUMBER: ENLARGED SITE PLAN DRAWING A1.2 MEETING RM MEETING RM MEETING RM MEETING RM LAUNDRY STO R. UP WC LOBBY/ WAITING AREA RESIDENTIAL COMMON ROOM 1011311=unl" STO R. WC ELEV. MACH. RM f LEV\� / ELEC. ROOM I I EXISTING WALL TO BE 1 1�� REMOVED EXISTING GLASS BLOCK\ I WALL AND DOOR TO BEi REMOVED * SALVAGED k I _ - - - - - FOOD PANTRY [:RECEPTION DESK I N I N 6 A3.1 EXISTING 15T ELOOK PLAN I 11411 = 1 1-011 I 2 I PROF05ED 15T ELOOK PLAN 11411 = 1 1-011 Janice T. Yeh i C-33243 Q Date: 07/31 / 19 r TFGP` . ��rl OF.�:.��``�� ADAPTIVE ARCHITECTURE 20111 STEVENS CREEK BLVD SUITE 270 CUPERTINO, CA 95014 (408) 865-1089 DRAWN:JY CHECKED: DATE: SCALE: AS NOTED A9/7/18 PLANNING 5UBMITTAL A 6/29/18 PLANNING 5UBMITTAL A3/23/16 PRELIM REVIEW Al2/1 G/ 17 PLANNING MTG Q 6/16/17 PRELIM REVIEW NO DATE BY DESCRIPTION REVISIONS DRAWN:JY CHECKED: DATE: SCALE: AS NOTED PROJECT NUMBER: FIRST FLOOR EXISTING & ROPOSED PLANS NUBE� A2.1 EX 1 ST I N G 2ND E LOOK PLAN I 11411 = 1'-o" � 2 2'-G" X 2'-G" WINDOW, 45 -MIN. FIRE RATED. TYP. OF (4) OFFICE I 95 5Q.FT. Cl OFFICE 2 95 5Q.FT. 63, 4 24'- 10" A3.1 A3.1 I COUNTER 1 IL` �--- 1 11-311 OFFICE 3 95 5Q.FT. co u'-511 1'-0" MIN. WC (E) r - - - - - � I I I � I I I NEW GLA55 PARTITION OFFICE 4 89 5Q. FT. I' -G" MIN.' 5'-2" I 7Io,,'-MINI STORAGE WC (E) ®I <D4V '�<�> 3 4 A 5 G OPEN OFFICE 7 8 • i 6 A3.1 I -HR FIRE RATED EXTERIOR WALL 4'-3i" 2 1 • OFFICE 5 (E) OFFICE G (E) OFFICE 7 (E) PROPOSED 2ND ELOOK PLAN STAFF LUNCHROOM (E) 5 A3.1 N 11411 = 1 1-011 I I Rc Janice T. Yeh C-33243 Q Qs, Ren. Date: 07/31/19 r TFOfGP. ADAPTIVE ARCHITECTURE 20111 STEVENS CREEK BLVD SUITE 270 CUPERTINO, CA 95014 (408) 865-1089 0 CHECKED: DATE: SCALE: AS NOTED A9/7/18 PLANNING 5UBMITTAL A 6/29/18 PLANNING 5UBMITTAL 3/23/16 PRELIM REVIEW 12/16/17 PLANNING MTG Q 6/16/17 PRELIM REVIEW NO DATE BY DESCRIPTION REV1510N5 DRAWN:JY CHECKED: DATE: SCALE: AS NOTED PROJECT NUMBER: SECOND FLOOR EXISTING & PROPOSED PLANS NUBE� A2.2 : J ' Janice T. Yeh C-33243 ADAPTIVE ARCHITECTURE 20111 STEVENS CREEK BLVD SUITE 270 CUPERTINO, CA 95014 (408) 865-1089 D CHECKED: DATE: SCALE: AS NOTED Q 9/7/18 PLANNING SUBMITTAL COMPOSITION HORIZONTAL WOOD VERTICAL WOOD SIDING PLANNING 50MITTAL 3/23/16 PRELIM REVIEW 12/16/17 PLANNING MTG SHINGLE ROOF TO SIDING TO MATCH (E) TO MATCH (E) PRELIM REVIEW NO DATE BY DESCRIPTION REVISIONS MATCH (E) i 2ND FLOOR ADDITION — TOP OF ROOF +27-'G 12" TOP OF ROOF +27-'6 12" I I — C.0 ❑ ❑ ❑ ❑ ❑ —SECOND FLOOR CEILING + 19'-5 /2" co 1 I —SECOND FLOOR CEILING + 19'-5 /2" jI� - -LEI 1Co I CV SECOND FLOOR+1 1' 5 1/2" N 1 M — — — — — — — — — — — — — — SECOND FLOOR+I I'-5 — FIRST FLOOR CEILING +9'-0" oji— FIRST FLOOR CEILING +9'-0 �o �oM]F — FIRST FI nnR+01-nll'11 — FIRST FI QQR-4-mn" i, (N) ROOF BRACKET (N) WOOD TRELLIS (N) ROOF BRACKET (E) ROOF BRACKET TO MATCH (E) TO MATCH (E) TO MATCH (E) WEST ELEVATION - EXISTING 1/811 = 11.011 2 WEST ELEVATION - PROPOSED 1/811 = 11.011 WINDOW SIZE TO HORIZONTAL WOOD MATCH (E), W/ VERTICAL WOOD SIDING TO MATCH (E) 45 -MIN FIRE RATING SIDING TO MATCH (E) — — — — TOP OF ROOF +27-' G 12" � 2ND FLOOR AD ITION — — TOP OF ROOF +27-'G f �7l I I r I� x — SECOND FLOOR CEILING + 19'-5 I/2" 1 — SECOND FLOOR CEILING + 19'-5 1 ,\A _o SIJ 00 CV — — — SECOND FLOOR+1 I'-5 1/2" ti — CV — I r SECOND FLOOR+1 I'-5 I/2" .1- .. I � — FIRST FLOOR CEILING +9'-0" — — — — — — — — — — — — — — — — — — FIRST FLOOR CEILING +9'-O" i N El El El - - x• �d I I� QQRnll Fi — —FIRI (E) WOOD TRELLIS (E) WOOD TRELLIS TO (N) ROOF BRACKET I - REMAIN TO MATCH (E) ALLOWABLE OPENING CALCULATION: vrt I -HK RATED WALL AREA = G40 SF OPENING AREA = 25 (WDWS) + 21 (DOOR) = 4G SF 4G / G40 = 7% <25% OF WALL NORTH ELEVATION - EXISTING 1/811 = 11-011 4 NORTH ELEVATION - PROPOSED 1/611 = 11-011 3 EXISTING NORTH WEST CORNER — TCF CF POOF +27-G 1/2' , CO SECOND FLOOR CEILING + 15-5 /2' I `R ■ + OPEN OFFICE WC STORAGE BOARD ROOM 'f . � OFFICE 2 �%/Z- WC INCWC Oo LUNCh ROOM --— — — — — —- 1 � N j / W LL(J) N — FIR5T FLOOR CFl y I iw { ' I - r 1 ..f — FIRST r1 nc-)R+n' EAST -WEST SECTION 1/811 = 11-011 6 NORTH -SOUTH SECTION 1/811 = 11-011 5 EXISTING WEST ELEVATION : J ' Janice T. Yeh C-33243 ADAPTIVE ARCHITECTURE 20111 STEVENS CREEK BLVD SUITE 270 CUPERTINO, CA 95014 (408) 865-1089 D CHECKED: DATE: SCALE: AS NOTED Q 9/7/18 PLANNING SUBMITTAL 6/29/18 PLANNING 50MITTAL 3/23/16 PRELIM REVIEW 12/16/17 PLANNING MTG Q 6/16/17 PRELIM REVIEW NO DATE BY DESCRIPTION REVISIONS DKAWN:JY CHECKED: DATE: SCALE: AS NOTED PROJECT NUMBER: SECTIONS & ELEVATIONS DRAWING �� ■ NUMBER: FACE OF BUILDING BELOW ROOF DEMOLITION PLAN I imil = I1-011 I 2 E I R Will - L � FACE OF BUILDING (E) SLOPE (E) SLOPE 4 4.4 4' EXISTING COMPOSITION SHINGLES ROOF +Ell (E) SLOPE (E) SLOPE I EXISTING ROOF BELOW I N PROPOSED ROOT= FLAN I imil = 11-011 AR Janice T. Yeh C-33243 g Ren, Date: 07/31/19Of c ADAPTIVE ARCHITECTURE 20111 STEVENS CREEK BLVD SUITE 270 CUPERTINO, CA 95014 (408) 865-1089 DKAWN:JY CHECKED: DATE: SCALE: AS NOTED A9/7/18 PLANNING SUBMITTAL AG/29/1 6 PLANNING 50MITTAL A13/23/1(5 PKELI M REVIEW Al 211 G1 17 PLANNING MTG Aro/ 16/ 17 PRELIM KEVI EW NO DATE BY DESCRIPTION REVISIONS DKAWN:JY CHECKED: DATE: SCALE: AS NOTED PROJECT NUMBER: EXISTING & PROPOSED ROOF PLANS B'E A4.1 HEXAGON TPANSPOPTATION CONSULTANTS, IN(. May 15, 2018 Ms. Ellen Yau City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 Re: Parking Study for West Valley Community Services Dear Ms. Yau: Hexagon Transportation Consultants, Inc. has completed a parking study for the proposed expansion of the West Valley Community Services (WVCS) building at 10104 Vista Drive. We understand that WVCS wishes to expand the building area by about 1,000 s.f. but does not propose to change any existing programs. Therefore, it is not expected that the building expansion would change the existing parking situation. The purpose of the parking study was to determine whether the current parking supply is adequate to meet the demand or whether the current supply is over -utilized. There are also roughly 5 street parking spaces directly adjacent to the site on Vista Drive (see Figure 1). Project Description WVCS has 24 residential units and an office/food pantry on the site. The food pantry is available for clients to come and get food once per week. Clients may drive, take transit, walk, or bike to the site. According to WVCS, only about 20% of clients drive to the site. Also, according to WVCS, the large majority of food pantry clients come in the morning. The office/pantry and residential units share 52 on-site parking spaces. The office/food pantry is open 8 AM to 5 PM on weekdays (Tuesdays until 8 PM), so it doesn't utilize any parking spaces on weekends. In order to facilitate shared parking on the site between residents and office/food pantry users, WVCS has implemented a system of cones. If residents leave in the morning but will return later before noon, they can reserve their parking space by placing a cone at the entrance. If they will not be back before noon, they are instructed to leave their space open so that it can be used by someone else while they are gone. Parking Counts Hexagon counted the parking utilization at the site on three typical weekdays (April 23-25, 2018) during the hours of 8 AM to 5 PM. Table 1 shows that the highest parking demand was found to occur Tuesday at 2:30 PM when 36 spaces were occupied plus one coned -off space. That left 15 vacant spaces on-site. 4 North Second Street, Suite 400 • San Jose, California 95113 • phone 408.971.6100 • fax 408.971.6102 • www.hextrans.com Ms. Ellen Yau May 15, 2018 " Page 2 of 3 Table 1 Parking Occupancy —April 23-25-2018 Monday April 23rd Tuesday April 24th Wednesday April 25th Lot Lot Blocked 8:00 AM 29 0 8:30 AM 30 0 9:00 AM 30 0 9:30 AM 32 0 10:00 AM 34 0 10:30 AM 32 0 11:00 AM 30 0 11:30 AM 31 0 12:00 PM 26 0 12:30 PM 24 1 1:00 PM 32 1 1:30 PM 33 1 2:00 PM 33 1 2:30 PM 34 1 3:00 PM 32 0 3:30 PM 29 0 4:00 PM 26 0 4:30 PM 27 0 5:00 PM 27 0 Lot Blocked 8:00 AM 24 1 8:30 AM 22 2 9:00 AM 22 2 9:30 AM 28 2 10:00 AM 31 2 10:30 AM 30 2 11:00 AM 32 2 11:30 AM 31 3 12:00 PM 29 3 12:30 PM 30 2 1:00 PM 34 2 1:30 PM 34 2 2:00 PM 36 1 2:30 PM 36 1 3:00 PM 33 1 3:30 PM 33 1 4:00 PM 32 1 4:30 PM 32 1 5:00 PM 31 1 Lot Blocked 8:00 AM 21 1 8:30 AM 20 1 9:00 AM 21 1 9:30 AM 21 2 10:00 AM 28 2 10:30 AM 30 2 11:00 AM 28 2 11:30 AM 22 1 12:00 PM 24 1 12:30 PM 20 1 1:00 PM 21 0 1:30 PM 23 0 2:00 PM 24 1 2:30 PM 22 1 3:00 PM 21 1 3:30 PM 24 0 4:00 PM 23 0 4:30 PM 22 0 5:00 PM 21 0 Ms. Ellen Yau May 15, 2018 " Page 3 of 3 Conclusions WVCS is not presently over -utilizing their parking supply. At all times during the parking counts, there were vacant spaces available on-site and on the street. The addition of 1,000 square feet to the food pantry building, without increasing services, would not result in a parking problem. We appreciate the opportunity to provide this parking study. If you have any questions, please do not hesitate to call. Sincerely, HEXAGON TRANSPORTATION CONSULTANTS, INC. Gary K. Black, AICP President Parking Study for West Valley Community Services Legend = Parking Count Areas .� HEXAGON r i r - � _ qIM S n_ Figure 1 Parking Count Areas NORTH Nam scale HEALTHMME • HOME • H E A R T West Valley Community Services February 20, 2018 VISTA VILLAGE PARKING MANAGEMENT PLAN NOTICE Dear Vista Village Residents, In order to manage Vista Village traffic and parking efficiently, WVCS will be implementing new parking management policies and procedures. Our goal is for the Vista Village residents, employees, clients, and volunteers to use our parking lot efficiently and effectively. Beginning March 5, 2018, tenants will be sharing vacant unoccupied, covered spaces ONLY from Monday -Friday between the hours of 8am — 12pm. The plan is as follows: • West Valley Community Services will issue a large GREEN cone to each Vista Village unit. The cone will remain in your covered parking spot next to the spots cement bumper. • Tenants who will be away from Vista Village and not using their covered parking spot between 8am and 12pm should leave the cone next to the cement bumper. This will signify that the spot is available for use. • Tenants that intend to use their parking spot between 8am and 12pm should place the green cone at the entrance point to the parking spot. • If the cone is removed or missing from your parking space, it means that the spot is open and available to use between 8am and 12pm, Monday through Friday. West Valley Community Services employees will periodically walk the parking lot to ensure that tenants are following the parking management plan. Should you have any questions, please feel free to contact us at 408-956-6112. We thank you in advance for your cooperation. WVCS Management Q Cd HEALTHMME • HOME • H E A R T West Valley Community Services SAMPLE If you will be away from Vista Village between Sam and 12pm, leave the cone next to the cement bumper If you will be using your parking spot between Sam and 12pm, place the cone at the entrance to your parking spot. EXHIBIT 1 0 0 Away between Sam-12pm EAway Return betweenam-12pm