PC Staff Report 02-19-2014 CC)MMUI\IITY I3EVEL+DPP►�LEN'F'I��i'A:RTNIEI�TT'
�;
, CIT3°�I,A.I.l
1.(3�t��}TC3�R�AV�T`iLiE�Ct�P�3't'I`fiNO,CA��0�=�-3�55
���1��777-33�1�•��X j�fi)777-3333
���������'
PLAI'+�l'�Il"�G� �[)M1VII5 SI(�I'� �TA�F TiEI�t�I�T
Agenda iterc� No. Agenda 17ate:Fel�ru�ry�19,�t��I�
Appiication l+do.; GPA�2D].�-D'�
Applican� Cit� �f�uper�ino
Locatior�lAT'N: City�vid�
SLJBJECT:
Study Session t� r��>i��v Housin� Eleznent requirements �r�d sit�� tn acl�i�v�� the iZe�ianal.
Ht�using�'���ls�lllocation�RHNA) fc�r tl�e upramin�201=�-ZC122 Hausing Eiemez�f
_
I�ECC��iC11rIENDATION:
Staff rec�mmencis that the Pl�nnit�g Com�n�.ssion;
1. R�viz��r�h�report on}�ot�ntial Housing Eleinent sites�r►d
�. Discuss pc��ent��� �iausing sites and �rovid� comm�nt� �rn t�� ��ic�rity hou�ing si�es tta b�
studie� iri tl�e joi��t Gen�r�l Plan Am�ndment�nd H�using El�ment Environrn�ntal In�pact
�eport {EIP).
BACKGROUND.
H+�usitig Eientenf t]verview
Ti1 ae�+�rdane����ith State Iav��, Calift�rnia �itaes m�ast have �i� ada�t�d General I'lan, ��Thi�ti niust
�cantair� a ��usi�3g �leme��t. �oiising E1�me31t .laSV requires ��at �11 jurisdi�tians facilit�ate
hr�usiri� deu�Ioprnent�by cre�ting��Iicie� ��xc� adc��ting l���c� irse plar�s anc� re�ulat�r}?'sch�m�s
tli�t �rc�vi�� c�ppc�r.tunities for l-�ou5�:ng develo�ment, ii�cIudin� i�i�its th�t cc�uTd aceomn�odate
ho�s�hc�lds ivith v�r�r lo��>, lc��v, mod�r�te an� 1�i�11�r incc�xnes. �or infc�rma�ion c�n Housin�
Eternent cont�r�t, please_s�e�ttacl�.ment PC=1.
Stat� la�v require� that each cify aiad county u�date its Housing Elerment on a pr�-deterniined
�}�cl�;fr�r�us cyc1�, �ousin�Element updates must be adcspted b}�Jai�uar��31, ?t115 (�lus a 1��-
c�ay grac� p�ric�d�. If tiyis adnpti�n.d��dlil3e:is m�t, �.he ��1�.nning p�rioc� Ec�r t��is r}�cl��xt�r�ds
frc�zn a�o�tian ta Ja.nu�r�f 3�, 2023 ��a� eiglzt ��e�rs). �tl��rinris�, the City mus� u���te t11�
H�usiz�; Clern�nt a�;ain in 2(319(ever�£our ye�rs}.
8�8
Regio�tal HousitxgIVeedsAllocation (IZ�iIUA)
The RHNA is a1z estimate of projected needed housir�g units t�roughout tlze State and is based
on Department af Financ�population projections and regional popula�ion forecasts.
The RI-TNA iden�ifies Cuperfino's regional hausing needs by inCOme levels:
� • . •
'V'er �.,ow 356 �����
Lour 207
Moderate 231 ��
Above Moderate 270 ;
Tota1 1,0��
The City is not obligated to construct the housing units identified by the RHNA. Rather, the
City's responsibility is to demonstrate adequate capacity, by identifying specific sites, to satisfy
tlle RHNA under existing zonuzg and land use policy. HCD generally requires jurisdictions to
show a surplus of sites/units in order to guarantee that the City could realistically accommodate
the RHl�A allocations.
General Plan Amendment
In addition to the Housing Element, the City is also pracessing a �eneral Plan Amendrnent
{GPA). The GPA was authorized by the City Council in August�012 and be�u1 in March 2013.
The GPA includes an analy�is of the falloxnring key topics:
A. De�elo��azerrt Alincrztior�s - T"he primary purpase of the GPA is to replenish, re-allocafie, and
increase citywide a�fice, commercial, hotel, and residentia� a11oc��ions in c�rder to plan for
antieipated future dev�lopment activity while keeping with the community's character,
goals,a�nd objectives.
B. CQiisoli�r�te Review Of Is�dividur�l GPA Reguests - The secondary pur�ose of the GPA is to
consolidate development requests by several property o��vners for amendments to the
General I'lan. The cornrnunity vision developed as part of the GPA process tvill help
evaluate the development requests along with the associated Gen�ral Plan amendments
being request�d. The consolidated General I'lan amendment process also provides a unique
apportunit�r for the community to provide input on the various requests received a� a
cit�Twide level, instead of a site-by-site basis,which only looks at a limited scope.
Th�ee draft Ge�eral Plan C+or�cept Al�ernatives have be�n prepared that outline different future
scen�rios. The alternatii�es were develc�ped ta re£lect cornmu.nity input (workshaps az�d nnline
input) as �c�irell as to respand to regional economic growtl� factors and housing needs. The
alternatirres ratzge frorn minimal chax�ge to tl�e current 2005 General I'lan (Alternatic�e A) to
rr►ore rnoderate gro�n�th(Alterr�a�ive B} to a g�eater change ir�developn�ent cri:teria�rhich reflect
the various properEy owners' requests(Alternative C).
89�P9
These changes in development intensity include changes to land uses,heights and developmenf
allocation.The alternatives specifically focus these changes on five major mixed-use corridors in
the cc�re of Cupertino—Homestead, North Wolfe, Heart of Ehe City, I�orth 17e Anza, and South
De Anza.
DISCUSSI�N:
Housing,Eiement Sites Criteria
HCD Criteria
HCD revie�vs e�ch Housing Eiernent's sites inventory to determine if adequate sites Izac'e bee�1
identi#ied to rneet the RHNA. Preparatian of a "site suitability �nalysis" is an important step in
addressing tl�te adequate sites requirement.For additional details �an HCD's site suitability
requirernents and criteria, pleas� see Attachment PC-1. A key point to note in I-iCD's criteria are
tha� sites �vith a net densify loc��er than 20 d�velling units �er acre da not +qualify for meeting
affc�rrlable housing requir�ments. Therefore, most sites discussed later in this report are in ar�as
that are at or above this den�ity.
Other S@COti(�lX)'i� CT'1�L3"IQ (St,�str�ina�le Comraz�sniti�s StrategylOrie Bay Area PI�z�� �zr�d C��per•ti�z�
G�nerrzl Pir���)
In additioz�tn the Sta#e-wrde crit�ria th�t HCD uses to determine sit� suitability, the Sustainable
Cotnmunities StrategyjOne Bay Area P1an cont�ibute additional criteria regaxdinb ��hat makes
a desirable housing site in the ABAG reginn. The r�gion's Sustainabie Communities Strategy
and the Ch1e Bay Area Plan focuses development in Priority Develapn�ent Areas (PL7A). Th�
City's General Plan policies are �eneraliy consistent w�ith the strategies in the One Bay Area
Plan. For additio�al details on the ather secondary criteria aild PDA's please see Attachrnent
PC-1. Cup�rtin�'s PDA llas been identifi�d v��ith a yello;v outli�le on Attachrnent PC-2.
Potential Hbusin�Element Sites
Consic�eration of Housing Element sites is still in the prelirninary stages. Througl� tl�is study
session, tlze City�vill continue to discuss sites with the public.Additio�lal sites may be identified
'l,l� pllbliC iI1pl.lt driC� COII11T21SS10ri21' t'�1SCt1SSlt�11. Whi1e s�veral sites are discussed in the report,
the City is only obligated ta pick sites enough to cuinulatively add up to 1,Q64 units. The
cumuIative tot�I of the rea�istic yield of all the sites �roposed to date far exceeds thc City's
RHNA. A rnap has been pre�ared �see AtEachment PC-2) that identifies�11�I1e sites �ropos�d to
date. An accompanying table {Attachment PC-3) pro��ides additionai info�•mation �bout each
site.Sites are not in any particular tird�r of prioriiy.
Sites in three categeries have been identified an the map:
■ Existiszg Housing Elet�zent sites —Seven sites ide��tified ir1 t11e 2007-2�14 Housiilg Element
are currently avail�ble. The others have ei�her been r�developed dr do nof ineet the criteri�.
o Lot Co��solidatiof�Poter�tiaX—Sites adjacent to existing Hc�usin��len�ent sit�s that�ould be
coi-�sidered for addition into the Housing Element for mor�collesive develaprnent.
89�30
■ Sites Pro�osed By Prn�ert� Owrzers - Ten property owners have ix�dicated an interest in
being included in the Sites Tnventory. Most of t�e developers have indicated a density range
highe�than that rurrently ailowed by the General T'lan and zoning for their site.
• Sites I'roposed By Worlcshop Pt�rticipants —Workshop participants at the January 23, 2�14
workshop identified 21 sites which could potentially be included in the Sites Inventory.
Environmental Tteview
An Environmental Irnpact Report{EIRj is being prepared for this project.The preparation of#he
EIR will commence once the City Council provides its cornments on the sites to be analyzed as
part of each alterna�ive st�zdied in the EIR at its March 4, 2014 meeting. The 30-day Notice of
Preparation (NOP) period will commence soon after the City Council meeting, with a scoping
session scheduled for March 11,2014.
It is anticipated that preparaYion of the Draft EIR wiil take abou� four months and will be
released for public review in Summer 2014.A �ammunity open house is planned during the 45-
day public review period. FolTowing the cic�se of the public review period, a Final EIR will be
prepared. The recc�mmendation from the Environmental Reviet�v Committee, public hearing for
the Planning Commissic�n and public hearing far the Council ETR review and certi£ication are
tentatively scheduled for Fa112014.
DISCUSSION:
Summary of Februar,y 12 Hausing Commission Workshop _
C7n February 12, the Housing Commission hosted a warkshop to continue the Housing Element
Sites discussion and prioritize sites fnr inclusian in the Housing Element. Following a project
update presentation, approximately fifteen {15j participants broke into three grnups and
discussed identificatian of nesv sites and prioritizing potential housing sites to meet tlze RHNA
of 1,Ob4.
The groups generally seerned to agree that sites with multiple access points, minimal impacts to
schaols and generate minimal level of n�eighborhood concer�ls would be appropriate as Housing
Element sites. Some of these included sites previously id�ntified in this report. 5orne
participants also added new sites to the list. 5ome of the si�es wer�prioritized by one group but
not by others and sc�me of sites jvere only acceptable if new development�vas a mixed use one.
7'he balance of tl�e sites have been leff c�n the list since there �vas no consensus on w�hether to
keep or remove the sites.These have all been included in Att�dtments PC�2 and PC-3.
Cos�rn�er�ts fr�tn the PuI�li�
The following is a summary of tlze key poznts made at tl�e�ebruary 12 meeting:
■ Building l�eigllts shoulcl reflect the character of the City. .
� Irnpacts of ne�w hausing on schools and traffic ne�d to be carefixily co�lsidered in the
siting of housing.
■ A balance �f retailJrestaurants and housing needs #� be achieved. Do not eliminate
places;vhere residents shop and dine out.
89�1
■ I�Tevv housing should be distributed throughout Cupertina.
■ Provide opportunities for different forrns of housing that may not be in Cupertino today,
part�cularly fdr senior residents and re�ent college braduates who do not need as much
living space.
• Given tl�at the city is virtually buiIt out, ensure that in futur� RHNA processes that
Cuperfii�a is not overburdened by a commitment to accammodate ec�en more hausing.
• Tl�e H�mpton site is a gnod location to accornmc�date a lar;e portion of �l�e rurrent
RHNA.
■ The current stock of affordabl�housing needs to be preser�c�ed to the extent possible.
The Hausing Commission recommended forwarding the sites highlighted by the workshop
participants. .1�ttachments PC-2 and PC-3 highlight the sites that the Hausing Commission
recommended forc�varding to the Planning Commission for consideration.
EIR Alternatives and Densitv Considerations for Sites
Tl�e California Enviranrnental Quality Act {CEQA) requires that alternati��es to a praject be
studied. T11ese must a�.roid or substantia�ly iessen at least one of tt�e si�nificant impacts af t1�e
Proposed Prpject. In addition,CEQA dQes not permit projects to be analyzed incrementally.
A combined Environmental YmpacE Report �vill be prepared for the General Plai� Arnendment
as weil as the 2014-2022 Housing Element. The EIR will analyze the follflwing key issues:
■ The General Plan Amendmenfs — As mentioned earlier in this sfaff report, the Cify is
curren�ly pr�cessing a General Plan Amendment. Three draff General Plan Cancept
Altematives ranging fram minimal change to the current 2005 Gener�l Plan (Alternative A)
ta �nore rnoderate growth {Altemative B) to � greater change in d�velopme��t cxiteria which
refl�ct t11e various property ownexs' requests (Alternati�re C), have been prepa.red for
��alysis in the EIR. Alternatives A ar�d B avoid or substantially lessen at least one of the
si�;nificant impa�ts of the Proposed Project{Alternative C}.
At this time, no sites are proposed to be �liniinated from the study excepf as rliscuss�d
below for each alternative. The preferred sites tn�ill Ue noted���hen a revie��v and decision c�n
the fu�al list of sites is made by the City Council. The final clecision on the list of sites is
expected in F�11 when the information on the E�� is available. Tt should be noted a lower
density o� a site ��vill increase the number �f sites �hat neeci to be pick�d to cumulatively
r�ach the 1,Ob4 units 12HNA oblig�tic�n,
o Alternative A ��rill in�lude potent�al hc�uszn� sites only within existing density ranges in
the G�neral Plan. Therefore, Alternati�Te A �vill not include sit�s ti�at �r�pc��e �
minimum density exceedin�that allovved in the'�0{l5 General Plan.
The t�nly change to this concept is in the South Sunnyvale-Saratoga �rea �I�e Anza
Boulevard area south of�ighway 85), vvhich is proposed to be combined��vith the South
De A:nza Boulevard Conceptual Plan {W�st si�e of De Aa�za Boulevard bet�veen Stevens
89�$2
Creek Boulevard ar�d Ballinger Road). The densify in the South SunnyvaIe-5aratoga area
will change from 15 dwelling units per acre to 25 d��velling units per acre to be consistent
with the density in the Sauth 17e Anza Boulevard ConcepMzal Plan Area. One site
proposed by tlle property owner (Yamagami's Nursery) is located in this area a�d will
be studied in this Altemative.
o Alternative B represents moderate grawth along five mixQd use transit corridors.
Therefore, in this Alternative, sifes proposed by property ovvners along major transit
corridors, and selected by the City Council for inclusion, wiil be studied at a density
between that in Alternative A and Altemative C {highest densi�y alternative). In this
alternative, these sites �vvuld be studied at a density of 35 dwelling units per acre
insteaci of 25 dwelling units per acre. Tn general, the current General Plan allows 25
dwelling unit$per acre exc�pt in the South Vallco Area where it is 35 d��velling units per
acre.
One property own�r (the Harnptons at Wolfe Rc�ad and Hwy 280� has proposed a
density ranging from 6� �0 11t� dwelling units per acre on their site. 'I'herefore, their site
is the only one selected at the loiver end of the density at 65 dwelling uni�s per acre. The
reason this site has been included a� a higher density than 35 divelling units per acre, is
�hat it is Iocated near the freeway and will cause minimal neighborh�od and school
impacts (this site is served by the Santa Clara Unified Schnol District).
o Under Alternative C {the proposed project), Housing Element sites proposed by
Property Owners, and selected by the City Council to satisfy the RH11�`A requirement,
will be s�idied at the maximum densi�requested by the property owner.
o Finally, CEQA requires the anaiysis of the No Project Alterr►ative. The No Project
Alterna�ive assumes no change to the current General Plan. The analysis for this
alternative zvill include buildout of the current 2005 General Plan. Therefore, anly th�
exi�ting housing eiement sites Tvill be included in tlle analysis. Under this scenario,there
are no changes to exis�ing land use policies, height limits, land use �iesibnations, or any
additional development allocation far offi�e, commercial, hotel and residential units. I�Io
new sites will be studied.
Othe�HocYSing Element R�quirements
il�date Housirzg Policies
Tli�update of the Housing Elem�nt has been divided into two areas of re��iew. The first ar�a of
rei�iew is the subject of this meetinb-identification of ad�quate sites appropriately zoned in the
City to accommodate the City's TtHNA.
The secand area n£ revie�v is an analysis and update of the exis�ing policies and programs
zvhic]Z iviil be pr�se�lted at a l�ter date {tentatively April 1, 2014 at a joint Planning
Commission/Ci�r Cauncil meeHnb.)
Streamlirred HCD IZevi�w
89�$3
H�D allaws for streamlined review of the Housing Element if the jurisdiction mee#s certain
criteria. This prc�vides f�r priority review for jurisdictions that are eli�ible over jurisdictions
that are eligible for st�ndard re�iew and limits the areas in which the HCD staff can
�omm�nt on. Thes� criteria include the adoption of an HCD-�ertifi�d Housing Element, the
adop�tion of a Density Bonus ordinance that conforms with State Law, tlle completion of re-
zaning of alI Housing Elen�ent sites that needed �e-zoning c�ith the 2007-2014 Housing
Element update, the adoption of adequate zoning to permit emergency shelters and
transitional/supportive housin,g, and tl�e establishn-�ent of a reasonable accommodation
procedure. If a jurisdi�tion is ilot eligible for the streamlined re�iew, HCD's revi�w
generally takes longer—up fo the 60 day period they are permitfed by law to review the
dc�cuments, thereby potentially delaying the adoption of the Hc�using Element. The
adoption deadline remains January 31, 2015 {plus a 120-day grace�erio�l.)
The City curre�tly co�npiies cvith alrnost all of the requirements to �uali#y fflr the streamlined
revie�v--the City has a HCD certified Housin�;Element that has been adopted, all the re-zonir►g
that was required zvith the last Housing Element cycle was completed at the same time as
acioptio�l of the Housing Element, cornpleted u�dates to the municipal code to allow adequate
en�er;ency sl�elter and transitionalJsupportive housing and the establishment of a reasanable
accornmoda�ion procedure. The final requirement-the adap�ion of a Density Bonus ordinance
that conf4rms to State L,acv-needs to be cc�mpleted prior to forwarding the draft of the Housing
Element for HCD revie�v. The �it�� would have to comply cvith State Law with or ��rithout an
updated ordinaa�ce.Ho�ever,having an updated ordinance will all�w the City to be eiigible for
streamlined review. Staff an�icipates prepari�g this ordinance far Pla.nning Commission revieiv
and Cauncil adoption at the time of presenting t}�e Draft Housing EIe�nent for fnr�.lrarding to the
HCD for its review in Fa112014.
PUBLIC NC�TICIP�TG &OUTREACH
T�z addition ft� the workshnp at the Hnusing Commission meeting on F�bruary 12, 2014, tlle
following outmach effarts have been unciertak�n on this proj�ct to date.
Sttckeholder Irzter•views
Stakeholder interviews were conducted on Dec�mber 11 & 12, 2013 to solicit input from
stakeholders ranging firom community members, property o���ners, housing deveic�pers,
service providers, School Districts and the business cotnmunity. The followi�lg is a summary
of cc�mments frorn#he intervie�vs:
� Overall hflusing affordabili#y and the �ap bet�c�een housing demand and supply at all
income levels
■ Need diversity of affordable rental units at a11 i��come levels�nd all he�usell�Id types
= Need to accommodate a gro�Tii�g aging population
■ Smaller units including innovative h�using models
� Support for mixed-�se simil�r to 5antana Rowr or dotivnto��vn Mount�in Vie�tiT
• Should b�Idw impacts ta schaols,priva�y,parking,nc�ise and�raffic
• 5ignificant financiai constraints to affordable housing develo�ers due to dissolution
83�84
of Redevelflpment
■ School L3istricts north of the city are impacted due to higher student generat�on rates
■ Looking to increase capacity by adding new buildings and tempc�rary, modular units
■ Most t�f the Apple Campus 2 scl�ool impact fee allocated to Santa Clara Unified
Uistrict��vhile th�expectation is that rnvst employees who move will reside within the
CUSD service area.
Sxrmrr�ary�f Jr�nuary 23 Joint T'C1�'IC Warksl�op
On January 23, the Plan��ing �ommission and Housing Commissian hosted a joint
workshop to begin the Housing Element Sites discussion. Eleven par�icipants broke into
small groups and identified potential future sites for housing and criteria for increased
density in certain areas including community benefits. Participants drew on maps and
placed stickers to identify potential housing sites. The following is a summary of comments
from the meeting:
■ Demand for market-rate small�sized unit� {limited bedroomsj to cater to peo�le
�vorking at Apple
■ Add levels to school buildings to increase cap�city
■ Concerns about:
o Churches naw having to be considered Housing Element sites
o Sustainability 9f the One Bay Area Plan
o Size of�he City's RHNA obligation
o Loss c�f�ommunity amenities to housing
The following table summarizes the noticing for this meeting.
�y,��'�� � � � :�a �� au�g�`�,��-� �a � '���y r�'�%'�.z�a�a..�a ������ ���L�,. ��.-]%K �.'� 3�.� - ��: � ��z 3 �-t��s�t. '� s � -��:.
.
<.__.,i�U�,s,.� .,,.,...;. "� � ��:.,'?& ,�.,z..��:.,.,. ,.? �°�m..: ,x .... . ,�,
.. ±.....,,:. . ., ,.,.. .,.,,_..« �, ,... .. .._...: . �:a a -�,..�,.�:r x_.z.a..,.� .,..>.,
� Ernail sent to all interested parties � Posted on the City's offi�ial notice bulletin
signed up thrdugh the proje�t website board (�n�u�ecy��rior td the lier��•ing)
• Letters sent ta current Housing � Pasted on the City of Cupextino's Web site
Element sate property +owners and (on�zveek�rior to tlze 1�enri�l�)
interested property c�wners � Posted on the project Website �one �tiTeek
rior to ilearin j
NEXT�TEPS
Th�goal for this study session is to revieiv the Housing Commissions' input and sites presented
to date, identify any other new potential sites for consideration, to plaee the sites in order of
prefere�lce.
The City Council�vvill meet on M�rch�,2014 to�rovide staff with Hnal directi�n an tl�e Housing
Element sites �nd densities to be shxdied in the EIR. The palicy portion of the revierv of �he
Housing Element will U� present to the Housing Commission i� lUlarch 2014 and the Planning
Carnmission and City Council at the Joint rneeting an Apri11, 2014.
9(�5
Upon completion of the Final EIR, th�Draft Housing Element will be revieN�ed by the Planning
Commission and adopted by the Council in Fall 2D14 for forc��arding to HCD. The Draft
Housing Element z�viil iriclude: housing policies as ��vell as fhe final list of housing sifes as well
as the relat�d General Plan Amendme�ts and rezoning for the sites. T:n addition, in order fo
comply zvith streamlined HCD r�vie;�v, a Density Bonus OrdinanC�, «Till be pr�pared for review
and adoptian. Upon HCD review and potential certification, the final Haizsing Element will be
�resented fox Piannzng Commission review and City Council d�cision in earl}�2015.
Prepared by: Piu Gl�osh,AICP, Senior Planner
MIG, Consultant to the City of Cupertino
Reviewed by: Approved by:
!sl Gar�Ch�o JsJ Aarti Shrivastava
Gary Chao Aarti Shrivastava
Asst. Dir.of Comn�unity Development Director of Communii�.�Development
Attachments
PC-1. Housing Commission Staff Report
PC-2. Pc+tential 2�1�-2022 Housing Element Sites M�p,rvith HC Priarities Indicated
PC-3. Potential 201�-2022 Housing Element Sites Sumrnary Table, with HC Priorities
Indicat�d
90�6
Attachment 1
COMMUNITY DEVELOPMENT DEPARTMENT
.
CIT'Y HALL
, •
10300 TORRE AVENUE • CUPERTINO,CA 95014-3255
(408)777-3308 •FAX(408)777-3333
CUPERTINO
HOUSING COMMISSION STAFF REPORT
Agenda Item No. 1 Agenda Date: February 12, 2014
SUBJECT:
2015-2023 Housing Element Update—Sites Identification
RECOMMENDATION:
Staff recommends that the Housing Commission accept the report on potential Housing
Element sites, host a community workshop to discuss housing site identification criteria
and sites, and reconvene to provide direction to staff on priority housing sites.
BACKGROUND:
Housin�Element Overview
The Housing Element is one of seven mandatory elements of the General Plan. The
Housing Element specifies ways in which housing needs of existing and future resident
populations can be met, and provides a comprehensive strategy for maintaining and
expanding the City's housing supply available to all economic segments in the community,
including very low, low, moderate and higher incomes. Housing Element law requires that
all jurisdictions facilitate housing development by creating policies and adopting land use
plans and regulatory schemes that provide opportunities for housing development.
State law requires that each city and county update its Housing Element on a pre-
determined cycle; for this cycle, Housing Element updates must be adopted by January 31,
2015 (plus a 120-day grace period). If this adoption deadline is met, the planning period for
this cycle extends from adoption to January 31, 2023 (or eight years). Otherwise, the City
must update the Housing Element again in 2019 (every four years).
As required by the California legislature and codified in the Government Code, Housing
Elements must include specific analysis and must meet statutory requirements regarding
contents. State law mandates that all Housing Elements must: 1) identify and analyze
existing and projected housing needs, 2) discuss constraints to housing development, and 3)
�identify resources to meet housing needs (including identification of adequate sites to
accommodate housing needs of all economic segments of the community). The Housing
487
Page 2 Housing Commission Housing Element Study Session February 12,2014
Element must include a statement of goals, policies, quantified objectives, and scheduled
programs for the preservation, improvement, and development of housing.
The California Department of Housing and Community Development (HCD) is responsible
for reviewing Housing Elements to determine compliance with Housing Element law. HCD
also is the responsible body for establishing the statewide the quantified objectives for
regional housing needs—the Regional Housing Needs Allocation ("RHNA").
� Regional Housing Needs Allocation (RHNA)
The RHNA is an estimate of projected needed housing units throughout the State and is
based on Department of Finance population projections and regional population forecasts.
The RHNA estimates are also correlated with long-term regional transportation plans. HCD
allocates the RHNA to each region. In the Bay Area, the Association of Bay Area
Govemments (ABAG), the regional planning agency, is tasked with the responsibility of
developing a regional housing plan—with a RHNA for each jurisdiction—to meet existing
and future housing needs.
The RHNA identifies Cupertino's regional housing needs by income levels. The income
levels are separated into four categories: very low, low, moderate, and above moderate. The
City's housing needs allocation for the period of 2015-2023 is 1,064 new housing units. The
City is not obligated to construct the housing units identified by the RHNA. Rather, the
City's responsibility is to demonstrate adequate capacity, by identifying specific sites, to
satisfy the RHNA under existing zoning and land use policy.
� � � •
Ve Low 356
Low 207
Moderate 231
Above Moderate 270
Total 1,064
HCD generally requires jurisdictions to show a surplus of sites/units in order to guarantee
that the City could realistically accommodate the RHNA allocations.
DISCUSSION:
Housin�Element Sites Criteria
HCD Criteria
HCD reviews each Housing Element's sites inventory to determine if adequate sites have
been identified to meet the RHNA. Preparation of a "site suitability analysis" is an
important step in addressing the adequate sites requirement. This analysis must
488
Page 3 Housing Commission Housing Element Study Session February 12,2014
demonstrate that identified sites can accommodate the housing needs—by income level—
within the planning period of the element (2015-2023).
While the site suitability review has a degree of subjectivity, HCD review primarily focuses
on the following criteria in determining the likelihood that a developed site will be
converted to some form of housing over the plaruzuzg period: existing use on the site,
realistic potential for recycling, site size and ownership patterns, and development density.
1. Existing Use on the Site. HCD generally does not consider the following types of sites
good candidates for private residential development:
■ Sites with existing multi-family housing developments consisting of 10 or more
units, due to the potential loss of existing investment and revenue stream to the
owner, unless the owner indicates his/her interest in redeveloping the site with
additional residential uses.
■ Sites with condominium developments, since they typically have complicated
ownership patterns and a developer would have to reach sales agreements with
multiple owners. _
■ Well-established organizations and institutions because of the difficulty such
organizations and institutions would face relocating to locations, unless the
. owner indicates his/her interest in redeveloping the site with residential uses.
HCD requires a more detailed analysis of redevelopment potential on sites with the
above types of uses. However, where adjacent vacant space is available and existing
uses would not be removed, HCD does not generally consider the existing use on
the site a cause for concern.
2. Realistic Potential for Recycling. HCD evaluates the feasibility of redevelopment based
on a variety of factors, some of which include property owner interest in
redevelopment with housing, market factors related to location or site
characteristics, existing uses on the site that are highly valued and anticipated to
remain, the condition and age of existing development on the site, and
environmental liability risks, such as land contamination.
3. Site Size and Ownership Patterns. HCD believes that larger sites provide the
opportunity to increase capacity potential and to provide flexibility with regard to
design, public amenities, mix of housing types, and mixed use development. It also
believes that lot consolidation potential of parcels can be a factor in determining site
suitability. Lot consolidation potential can be based on ownership patterns (single,
limited, or multiple owners), history of lot consolidation in the area, and specific
knowledge of owner interest in lot consolidation. Where lot consolidation potential
is likely, the time and cost associated with development is reduced and thus the
likelihood of redevelopment is increased.
489
Page 4 Housing Commission Housing Element Study Session February 12,2014
4. Development Densit�. HCD has identified a density of 20 units per acre as adequate to
encourage the development of affordable housing in Santa Clara County due to
economies of scale that a developer can achieve. Sites that permit a density of less
than 20 units per acre would not be considered as appropriate for fulfilling the
lower-income RHNA requirement but could be appropriate for fulfilling the
moderate and above moderate income RHNA requirement.
In addition, HCD also evaluates the realistic yield for each site proposed to be on the
Housing Sites Inventory. In Cupertino, HCD has accepted a realistic yield of 85% of
the maximum density allowed on the site, based on city-specific historic project
approval data. This means that for a one acre site, the maximum yield at a density of
25 dwelling units per acre is 25 units. However, the realistic yield for Housing
Element purposes is (25�85%) =21 units.
Other Secondary Cr�iteria (Sustainable Communities Strategy/One Bay Area Plan and
Cupertino General Plan)
In addition to the State-wide criteria that HCD uses to determine site suitability, the
Sustainable Communities Strategy/One Bay Area Plan contribute additional criteria
regarding what makes a desirable housing site in the ABAG region. The One Bay Area Plan
is a long-range integrated transportation and land-use/housing strategy through 2040 for
the San Francisco Bay Area. The Plan was jointly approved by the Association of Bay Area
Governments (ABAG) and by the Metropolitan Transportation Commission (MTC) in 2013.
ABAG determined the City's and other local jurisdiction's RHNA based on the Plan.
Pursuant to SB375, the Plan includes the regiori s Sustainable Communities Strategy and the
2040 Regional Transportation Plan. The Plan focuses development in Priority Development
Areas (PDA). PDA's are locally designated areas within existing communities that have
been identified and approved by local cities or counties for future growth. 'These areas are
typically accessible to public transit, jobs, recreation, shopping and other services and
absorb much of the growth anticipated in the region. In Cupertino, the Priority
Development Areas are located along Stevens Creek Boulevard between Highway 85 and
the City of Santa Clara and along De Anza Boulevard between Stevens Creek Boulevard
and Highway 280 (see Attachment HC-1 —VTA PDA Map)
The City's General Plan policies are generally consistent with the strategies in the One Bay
Area PIan. Key themes include:
1. Location along major transportation routes with access to transit or within 1/2 mile of a VTA
Priority Development Area (PDA)
2. Proximity to employment and activit�� centers
3. Proximity to amenities
4. Corner lot(s) preferred—such parcels provide the most flexibility to accommodate mixed-use
developments and avoid impeding parking and connectivity between mid-block parcels.
490
Page 5 Housing Commission Housing Element Study Session February 12,2014
Potential Housing Element Sites
Consideration of Housing Element sites is sti11 in the preliminary stages. No decisions
regarding rezoning, density increases, or inclusion in the Housing Element has yet been
made. Through this study session, the City will continue to discuss sites with the public.
Additional sites may be identified via public input and Commissioner discussion.
While several sites are discussed in the report, the City is only obligated to pick sites
enough to cumulatively add up to 1,064 units. T'he cumulative total of the realistic yield of
all the sites listed below, at the maximum densities proposed, is 5,426. A map has been
prepared (see Attachment HC-2) which identifies all the sites discussed below.
Existing Housing Element sites:
The 2007-2014 Housing Element identified 13 sites (See Table 1 below.) Of these, four sites
have since been developed and three sites do not meet the criteria discussed previously and
have been identified in the table below with strikethroughs. For specifics on these sites,
please see Attachment HC-3 (Site Criteria).
Tab1e 1: Existing Housin�Element Sites
Max.
Size Current Land Use Current
No Sites Address Density
(acres) �DU/gr. ac.) Designation Zoning
1. �aQ�� c+„�,�r� r,,,,,,,,,,,,,�;.,i i n��;,,,,i n��
.
�,.,,,,7.ui�,a �� �5 r�„�;,a,.,-,,-;.,i �3
���{�� "�QQC.C. C'!-.�Tr��-�n �'�mmn�+l.in��n�Fin�/ 171�'�
z�c�
r',-,,.,1.Rlt„-7 �z� z�J Ta.,�;.-a.,,-,�-;.,7 77^�\
���
2. I-Restaurant 20007 Stevens 1.35 25 Commercial/Office/ P(CG,
Creek Blvd Residential Res)
3. ��--�-�--�i�e �nn��z c.,;,,�-,
�,,,Y,,,.,,,,.,,,.,iincc;,,,,i �
� � a:� � '
,�„�;a,,,-,�;�, �
4a. r,..,,-„a u„��,.�i �nn�zn c,.,,�,,,,-.� r,,-.,-,,,,,,,,,,-.;.,i i n��;,-.,,i ni�
�s r-,,,,,,,i. R��„a � � rl,.�;a„r,.;.,� }��
�1H.,�: �99�1�- �,,,,-,,.,.,,,,,�,,,7 i n��;,,,,i �-(-�G_ .
� � �
n„ ;a,,,..�•.,, }�
r .,,,i.,.t,n,,,,,-, -�-88--3�� r,,,,,-„Y,,,,,,,,.,i i n��;,,,,i ni�rr...
--� - --r° �� �J �
!� 1?.,�;,a,,,�+;.,1 17^�1
�� . .���
4b. r�,,,.,-,,,,. ,-.�c�iz �mm� c+„t,,,,.,� r�,,,.,.,,-,..,,,.,,;.,i i n��;,,,,i �.
�
r,,,,,,,i.Rit,a a-4� �5 n„�;,a,,,-,,-;.,i �}
5. �� �aa�znc�-„t,,.r� r��,...,,.,,,,,.,-.;.,iin��;,,,,i �
&44 � �
r,,,.,.7.izit,a n„�;a,,,-,+;.,i �
491
Page 6 Housing Commission Housing Element Study Session February 12,2014
Size Max. Current Land Use Current
- No Sites Acldress Density
(acres) �DU/gr. ac.) Designation Zoning
���� �aa�zti c�„�,,,,-,� r,,,,-„-,.,,,,,,.;.,i i n��;,,,,i ��.
.
� r-,,,,,,,i.Ri<,a �- � r�„�;a„r,-,.,i �
6. cr� �,,,.,.,;�-,,,.,, �aann c+„�r,,,.,� r,,.,.,.,,.,.,,,,,,,;.,i i n��;,,,,i �
3� � �
(',..,.,1. Rl�r.a n�n\
��.,�.�
7. United 10025 E. Commercial/Office/ P(CG,
Furniture Estates 0.92 25 Residential Res)
United 10075 E. Commercial/Office/ P(CG,
Furniture Estates 0.53 25 Residential Res)
United 10075 E. Commercial/Office/ P(CG,
Furniture Estates 0.86 25 Residential Res)
8. Barry Swenson 19160 Stevens Commercial/Office/ P(CG,
Site Creek Blvd 0.55 25 Residential Res)
9. Loree Center 10029 Judy 0.43 25 Commercial/Office/ P(CG,
Ave Residential Res)
Loree Center 19060 Stevens Commercial/Office/ P(CG,
Creek Blvd 0.86 25 Residential Res)
10. r,r,,,.,,,�,u,.,,�_ �9-59g �r�d�� '�
--, �9 �5
n„ ;a,,,,�;.,i �}
TR,-.,.l�t,R,..,� �� ��}�„�� �
------� —--- � � �
1?„ ;,a.,,��'.,1 12^�\
.. ���
11. Glenbrook 10160 11.62 2p Med/High Density R3
A t. Parkwood (10-20)
Glenbrook 21297 19.72 2p Med/High Density R3
A t. Parkwood (10-20)
12. The Villages 20800 Valley 5.35 2p Med/High Density R3
A t. Green Dr. (10-20)
The Villages 20975 Valley 5.49 Zp Med/High Density R3
A t. Green Dr. (10-20)
The Villages 20990 Valley 6 78 20 Med/High Density R3
A t. Green Dr. (10-20)
The Villages 20800 Valley 2.69 2p Med/High Density R3
A t. Green Dr. (10-20)
The Villages 20875 Valley 6.79 2p Med/High Density R3
A t. Green Dr. (10-20)
13. Carl Serg 20705 Valley Office/Industrial/
property Green Dr. 7.98 25 Commercial/ P(CG,
Residential
ML, Res)
492
Page 7 Housing Commission Housing Element Study Session February 12,2014
Sites Proposed By Property Owners
Several property owners have indicated interest in being considered to be added to the
Housing Element Sites Inventory list. Table 2 below identifies the sites and the current and
desired development potential. Sites are listed in alphabetical order and are not in any
particular order of priority. Details about the site criteria are available in Attachment HC-3.
Table 2: Sites Pro�osed Bv Propertv Owners
Existing Desired Current Land
Site Size Density Density Use Current Current Use
(acres) (DU/gr. �DU/acre) Designation Zoning
ac.)
Bateh Brothers (S-W ±0.67 15 20—35 Commercial/ P(CG) Convenience
corner of Foothill Residential store
Blvd & Stevens
Creek Blvd)
Cupertino Village ±12 25 35—40 Commercial/ P(CG, Res) Commercial
Residential stri mall
Foothill Market ±1.3 15 20—25 Commercial/ P(CG) Commercial
(Stevens Canyon Rd Residential strip mall
at McClellan Rd)
Marina Plaza ±4.35 25 25—40 Commercial/ P(CG, Res) Commercial
Residential stri mall
Market Place ±9.9 25 25—35 Commercial/ P(CG, Res) Three newer&
Residential one aging
commercial
buildin
Stevens Creek Office ±4.8 25 35 Commercial/ P(CG,Res) Office
Center Residential buildin s
The Hamptons ±12 25 65-110 High density P(Res) Apartment
residentia120- complex with
35 DU/ r ac 342 units
Vallco Mall ±35 35 No Commercial/ P(Regional Indoor Mall
chan e Residential Sho in )
Wonderland ±1.83 None/ 1-5 20—25 Quasi-public/ BQ/R1-10 Pre-school/
Chinese School & Institutional & After-school &
10921 Maxine Low Density Single family
Avenue Residential home
Yamagami's ±2.33 15 25—40 Commercial/ P(CG, Res Commercial
Nursery Office/ 5-15) strip mall and
Residential nurse
493
Page 8 Housing Commission Housing Element Study Session February 12,2014
Sites Proposed By Workshop Participants
In addition to the sites that have been proposed by property owners, participants at the
January 23, 2014 workshop identified several other sites as having potential for residential
development or redevelopment. These sites have been provided in Table 3 below. Sites are
listed in alphabetical order and are not in any particular order of priority. Details about the
site criteria are available in Attachment HC-3.
Table 3: Sites Pro�osed B�Worksho� Partici�ants
Site Size Current Current Land Current Current Comments
(acres) Density Use Zoning Use
(DU/gr. Designation
acre)
21731 Stevens 0.62 4.4—12 Neighborhood P(CN, Strip mall Martial Arts school, dry
Creek Blvd (Next Commercial, ML, Res cleaners and beauty salon
to Post Office) Industrial and 4.4-12)
Residential
76 gas station and ±0.7 25 Commercial/ P(CG, Gas station Odd shaped site.
adjacent office Residential ML, and office
building (10625 N. Res) building
De Anza Blvd &
20545 Valley
Green Ave)
Abundant Life ±3.8 25 Commercial/ P(CG, Church This site was considered
Church (N. Residential Res) as a Housing Element site
Stelling Road) in the 2007-2014 planning
cycle. At that time the
property owners had not
ex ressed interest
Caltrans (on Bubb ±2.9 20 Industrial/ ML-rc Service/ This property owned by
Road) Residential Corp. Yard the State of CA is used as
their Cor . Yard.
Cupertino ±14.7 25 Commercial/ P(CG, Shopping A portion of the site was
Crossroads Residential Res) Center recently redeveloped and
the balance of the site is
mostly tenanted with the
exception of one or two
tenant s aces.
Cupertino ±4.4 25 Commercial/ P(CG, Office This site has recently been
Financial Center Residential OP, complex acquired by JP Morgan
(NE corner of Res) and has an office
Wolfe and SCB) buildin .
494
Page 9 Housing Commission Housing Element Study Session February 12,2014
Site Size Current Current Land Current Current Comments
(acres) Density Use Zoning Use
(DU/gr. Designation
acre)
Cypress Hotel ±1.3 25 Commercial/ P(CG, Hotel Site is developed with a
Residential Res) hotel that has property
lines contiguous with its
foot rint.
Evulich Ct @ Linda ±2.5 5 Low Density R1-7.5 Single Older homes on
Vista Dr Residential Famil underdevelo ed lots
Good Samaritan ±1.36 25 Quasi-public/ BQ Church Existing Church
Church Institutional
(Homestead Rd)
Homestead Lanes ±4.6 35 Commercial/ P(Rec, Bowling Older shopping center
and adjacent sites Residential Enter) & alley &
(20990, 20956 & P(CG) adjacent
20916 Homestead) stri malls
Homestead Road ±5.4 15 Commercial/ P(CG) Office May be an appropriate
(21020, 21040, Residential buildings, multi-family housing site
21060, 21070 parking lot at a higher density.
Homestead and and tennis
APN: 326 07 036 courts
and 326 07 033)
Main Street (East ±11.5 25 Commercial/ P(CG, Mixed use Site is currently under
of Finch Ave) Residential OP, with hotel, construction pursuant to
Res) commercial entitlements that the
and office property owner received
in 2012.
Oaks Shopping ±7.9 25 Commercial/ P(CG, Strip mall Site has entitlements for a
Center Residential Res) and theater mixed use office building
and hotel which expires
in Se t. 2014.
PG&E Service ±21.6 N/A Quasi-public/ BQ Corp. Yard PG&E has not expressed
Yard (N. Blaney Institutional interest in redevelopment
Ave) of site
PG&E lower ±10.6 N/A Quasi-public/ A Power PG&E has not expressed
Substation (CA Institutional Substation interest in redevelopment
Oak Wa ) of site
Portal Plaza ±5.22 25 Commercial/ P(CG, Strip mall Shopping Center.
(Between Portal& Residential Res) Minimal vacancy at this
Perimefer) site.
495
Page 10 Housing Commission Housing Element Study Session February 12,2014
Site Size Current Current Land Current Current Comments
(acres) Density Use Zoning Use
(DU/gr. Designation
acre)
Post Office site ±5.2 4.4—12 Neighborhood P(CN, Post Office This site is owned by the
Commercial, ML, Res US Postal Service.
Industrial and 4.4-12)
Residential
St. Joseph's Place ±2.2 25 Commercial/ P(CG, Strip mall Older shopping center
(Cafe Torre site) Residential Res)
Union Church of ±3 25 Commercial/ P(CG, Church, Existing Church with
Cupertino Residential Res) Pre-school historic designation. This
(Stevens Creek site has recently added an
Blvd) annex building to increase
services at the site.
Village Green ±7.5 16 High Density R3 Existing Based on R3 zoning,
Apartments Mttlti-family apartment maximum yield is 161
residential (20- coinplex units. For HCD's
35 DU/gross with 122 purposes, realistic yield is
acre) units 137 units. Therefore, this
property has the potential
to add 16 more units.
Very low yield. Open
space availability needs to
be studied.
Vivi s Falafel 0.44 4.4—12 Neighborhood P(CN, Strip mall Restaurant and shoe
(21771 Stevens Commercial, ML, Res repair store.
Creek Blvd/Next Industrial and 4.4-12)
to Post Office) Residential
PUBLIC NOTICING & OUTREP.CH
Stakeholder Interviezvs
Stakeholder interviews were conducted on December 11 & 12, 2013 to solicit input from
stakeholders ranging from community members, property owners, housing developers,
service providers, School Districts and the business community. A summary of common
themes from the interviews is attached as Attachment HC-4.
Summa���of January 23 Joint PC/HC Workshop
On January 23, the Planning Commission and Housing Commission hosted a joint
workshop to begin the Housing Element Sites discussion. Eleven participants broke into
small groups and identified potential future sites for housulg and criteria for increased
496
Page 11 Housing Commission Housing Element Study Session February 12,2014
density in certain areas including communify benefits. Participants drew on maps and
placed stickers to identify potential housing sites. See Attachment HC-5 for transcribed
comments from the January 23rd small group discussions and Attachment HC-2 for a
consolidated map of potential housing sites.
The following table summarizes the noticing for this meeting:
Notice A enda
■ Email sent to all interested parties ■ Posted on the City's official notice bulletin
signed up through the project board (one zveek prior to the hearing)
website ■ Posted on the City of Cupertino's Web
■ Letters sent to current Housing site (one week prior to the hearing)
Element site property owners and ■ Posted on the project Website (one week
interested property owners prior to hearing)
CONCLUSION
The goal for this study session is to review the sites that have been presented to date,
identify any other new potential sites for consideration, to, potentially, rank the sites in
order of preference with the understanding that sites must be chosen such that the
cumulative yield of all the sites picked add up to a total of 1,064 units to make a
recommendation to Planning Commission on priority housing sites that should be
considered to meet the RHNA.
Prepared by: MIG, Consultant to the City of Cupertino
Piu Ghosh, AICP, Senior Planner
Reviewed by: Approved by:
/s/Garv Chao /s/Aarti Shrivastava
Gary Chao Aarti Shrivastava
City Planner Community Development Director
Attachments
HC-1. VTA PDA Map
HC-2. Consolidated Sites Map—Potential 2015-2023 Housing Element Sites
HC-3. Site Criteria Matrix
HC-4. Common themes from Stakeholder interviews
HC-5. Transcribed comments from January 23, 2014 meeting
497
ATTACHMENT PC- 2
r ' ••` � -
1 ' � � � •�-•. SUNNYVALE
• � �
/ '� � �. � •�, � � LO S A LTO S ``�„�„�, ' HOMESTEAD RD � ;
' � . .�.. ��_� � �. ��_ ____
� � .--_�...�.. ti_.. .. . � �..�...�..�_ . , �
. .
. . ;
• � • _ .__.. ,
� ` . r"__"` �..L � ..
� � ,'•
i , ` : ` , � 'j r , I � ' �• •� �--
. f j 1
, ' • 1 \ � J �•• • , �
.
� _ � 1 .•�• • •,� � I � .
� ' � .S ' � � •��• � /U�..�„�� •• �� '--------, � ..� �,M.c..� . °„�.�r .�:
' ♦ . j�, Fi ./ �� , I ,,..
�i .� '�/ � '�' �� � .i� � � i . .. � � R
� • .
.. � �___,_ _
y� .
� ♦ � ... r � vALLEY�R�` ' �.� _ _ ERID
.i � � �:.L ` � ti � � � ffN . ,, � .� �.,--N �, GE qVE
_, _�
• .. � •. a < �-------.�, ; p: - ��..
��� ��� �•��� �� � � � -. 7 � � �� .�• :�� � � Q� I
� � ��� Q � 0 Q+, w �t � �.
I � ` � � Q Q W� � ~'! �
.• } m m z; F z; : X SANTA
♦ � ? • Q� � �' � W
, 4 � CLARA
0
•�.�` SALEM q E � - 22 � m a �� �°; v
� �rG �1LVES� R � � :U�QLLGOp� � W
�`�•. '7 ����,� ? � � ��" • LY
.
�•■ �� �G � � Eyr, j � Sit Not � �
.
.
� ' ' _:._.t� : .,..____J �..._ "�" C�. Availa6le. Q
__
�
� u,i ;. __ - -_ _._.__... __ -- _ ' �.!
/ _..___. . _ > STEVENS CREEK BLVD �, ( ��� __.._ ' _F_ �; - —— ——— —— ——
Q , �.��,, �, -..�
_L..
� - � Q ; 7; �
'��- -� , �. W , .. � i 'Lii'L1�IW$ ' w'�L..��.
'�` m r . � , °' CL O� � ' �t7
, : . .
�i�; � C �! S � • � � .
`� � ; _ -r�` 1 �N� J ,;E-.:^: 00 �'� >
1 W ¢ .
, �;� •_ a � ¢ ' i � > `
I— r f: , W N . Q � iT� �`'` l
' � � MC�LELLAN RD f- Z , i v � ; ;h"
� �, Q ? ;<..
�..._.._.._..� o , Z :
LL ,...� , - `� �
W ..._ -.. W LL
✓� " - 4 — "�. > •
I ' ,` Q �
i: �.
% .,�* W �
I HYANNISPORT DR �■.�■� ` "'�� �
��
� • cr'
: ' ' •
.�
�• B�
o � `� �., � � '��� �...�..��•.�••�••�..�..�,.�►�ER RD
'11 `..• f '�•.�
i.�■.�..�..�' � . . � � ��� ' � . i
:. ` . .
�..�..�..�..�..�r tp . '..
H m `_ �
� �
I ` � �- m
L, �"'
r�
i ' � •'� . p �=� /: .. . • �„'r
i• � J µ . / r . .. � .
I _ _ �:
; f
�
' •' '' SAN JOSE
_ „_.,
..�..�..�„�..�••Z�..� ° �
� RAINBOW DR
..�..� f�
`6
� ' /•. ti
;_.._.._.
'��,. �
STEVENSCREEK I J •� " � r'
RESERVOIR � � � � �
�k Site Note: � I ' I r '1� j
I r' N
._.i ' ..�N��.� PROSPECT RD { �
Previousfy �=r!o�r-v�� �:rt� �.,.ticc: : • •
the Yamagarni s site I L•'1 "�"��" —__----__ �
J -+ Soo �,600 �
Prepared by: MIG, liic. zoi3; Source: City of Cupertiriu (,IS, zoi4 i � � SARATOGA �� "'-� Feet
/
��..� City Boundary Existing Housing Element Sites � Sites Proposed by Property Owner priority Sites based on Housing
WaterFeature Existing Housing Element Sites(Available) � Sites Proposed by Workshop Participants ❑ Commission Workshop (ozI�2I�4)
VTA Priority Development Area (PDA) Former Housing Element Sites r��ti Conflictin Consensus based on Housin
' Recommended for Removal � Site Number: Realistic Capacity � � g g
� Freeways � � See attached list for Site Number. Realistic capacity is 85%of ���a Commission Workshop(ozI�ZI�4)
Major Roads � Lot Consolidation Potential maximum capacity,consistent with the Housing Element.
� Existin and Potential Housin Sites
��PEAr,�o g g
Potential Housing Element Sites-Housing Commission Workshop Exercise
Legend: Le end:
ATTACHMENT PC - 3
Prioirty Sites based on Housing Commision Workshop Feedback(02/12/14) Site available but not specifically identified as Prioirty site at Housing Commission Workshop(02/12/14)
^ � � � � �
� �Prioirty Sites with conflicting consensus based on Housing Commision Workshop Feedback(02/12/14) E�eisti�tg-�IB-si Site no longer available or does not meet criteria.
� � � � �
HCD's Development Potential Criteria Secondary Criteria-
SCS,Plan Bay Area&General Plan
�
� v
� �, y Along Major ,� � ;� v
Site Size& � v � � •� • v -�
,° � �- o Transportation � � � o °p
Current Realistic Ownership a v '� ,..� � � ,� � � x �
Site Current Existing � U v ,. Routes with access to v �? V {'
Site Name Address Type of Site Land Use Potential for Potential& W �, � v � � NOTES Q o � o U o
No. Zoning Use o � � transit or located � .�-'' •� v �. „ �. w; �.
Designation Recycling Development � ,� � o � � � C7 ;� C7 � C7
Density z V within 1/2 mile of Q '� � � �
u �
� � VTA PDA � °w' °�-'
�o � Q �
�.
c.
Existing Sites in the 2007-2014 Housing Element(+Consolidation Sites)
Commercial/
19875 Stevens Recent im rovements made to the
- -Ftrrn'rhnr29A0-- - Creek Blvd --ExiatirtgI-�Esite --Offic�{- P(£�Res - -'� -. - -'�(- --- -- -. �- �- -- .�-.�-. - -'� �if -. � -�.- - - � --`L5- �39-----build ng and property. -. -
Residential
1
Commercial/
19855 Stevens Site too small for development of any
._ __ ����y�- — — -- �:��,�-F�:-�—��._ r�c-�� — �� _. _.� ._. _ __ �.. �� _ ...... �,� _ —,� .�. _ ..._ ,.�_ � _ c� �� —5-- ———— ———— ——
Creek Blvd substantial mixed use development.
Residential
Commercial/
Shaan Restaurant 20007 Stevens � � �
2 Existing HE site Office/ P(CG,Res) � � � � � � 1.35 25 Retain.
(Erstwhile I-Restaurant) Creek Blvd
Residential
10041 N.Blaney Commercial/
L2 Q-Mart New site Office/ P(CG,Res) � � � � � � � 25 36 These two small sites are located adjacent � � '�
Ave
Residential to an existing Housing Element site.One
of the sites is owned by the same property
Commercial/ owner.Recommend including in Housing
20021 Stevens Element sites invento at worksho
L2 China Dance Studio New site Office/ P(CG,Res) � � � � � � 25 ry p• � � �
Creek Blvd
Residential
Commercial/
7-11 site behind Site recent�entitled with a commercial
--�— — —— — — -- — reo�sat�tr�vaq �ctsrn,��� —-efitre� ——��e��E� .--�— — — -- �- — —— �- — — — —�— — —�— ;{-- i _. -� -- —_ �_ �.rr _ �— — �__ —
Bombay Oven development
Residential
Commercial/
20030Stevens _ __ __ � � � � _, � � � _ _ _ _ _ _
- �rancfi8uffe�oas- - ---- .xistitig t��sife �Uff�ice/- 1'tC�ResT` - � � _. _- --_ _.. _. -- - - - - ..� __. _.__ �,� ___ --- _ Tlb- `�2�
Creek Blvd
Residential
Commercial/ Sites have developed with mixed use
Lackey Prop.(SCB&
4r,- - - -- - - }9fl','�-�lancy-Aro�e iatiirgF�E site -�3ffieq` - I'(f6;Rrs - -# -- _ -_ --�C- - - - -�1- - - - �- - - d- -^� ---�--- (�-3 2s -� - eaic}enti�rt e�kCvc}opmcnt i�n-cenjm►ctien
Blaney)
Residential with another adjacent site(Chili's)
Commercial/
Lack�Pro�(SCB&
- 7CICl'3�'S�la7Sep7�VLs�7cifitin�I-��'TC� -�ffic'�J' - I'j��I�S) � -_ - - -- -- --- - - - - - - - - - - - - - - - - - - f.36 �5' - - - - � - __ � _._ __ _.. ._. _ _
Blaney)
Residential
Potential Housing Element Sites-Housing Commission Workshop Exercise-February 12,2014
Legend: Legend:
�—_�Prioirty Sites based on Housing Commision Workshop Feedback(02/12/14) Site available but not specifically identified as Prioirty site at Housing Commission Workshop(02/12/14)
�... � � � � �
� � �Prioirty Sites with conflicting consensus based on Housing Commision Workshop Feedback(02/12/14) F�rn4�g-�IE-r�i Site no longer available or does not meet criteria.
� � � �
HCD's Development Potential Giteria Secondary Criteria-
SCS,Plan Bay Area&General Plan
a�, ro : �'
� �, y Along Major ,Y � '�.° v
Site Size& � v _v � •� '� .� �
° +� � � Trans ortation � � o
Current Realistic Ownership Q• v q „°� p � � � � � x z
Site Current Existin � v Routes with access to a+ Q
Site Name Address Type of Site Land Use g Potential for Potential& W �, � v � � NOTES � o � o U o
No. Zonin g U s e o ;.• � w t r a n si t or loca te d � .�'' a, �. v w ;; ••
Designation Recycling Development � ,� �. o N � � C� a C� � C�
e° U within 1/2 mile of � ' � �
Density �� � z VTA PDA Q � �' � �
�x � ¢ d
0
.�
C.
Commercial/
20010 Stevens Site too small for devel�ment of any
�b-earr�er'af 9eB'��ta --- -- Rtsth'rg�fL�sit ��fffie� 'i'(�;�esp' -,�-- -- --�--- - -�(--- -�i - �'.v,� �}- � -'d'.-- "'Q.47' 25 --g - - ---
Creek Blvd substantial mixed use development.
Residential
Commercial/
19930 Stevens
� - - -� xjsti H�E ' -C-3ffieeJ- 6;�es - -- - - - - - -- - --- v __ � �, �� ---- $$�4�-2�- -'}- � , _ � �. � _ �_ - � e.._ -- - - - --
�� � Creek Blvd 9 � �
Residential
s �l J J J J x J
These sites are not a corner lot and have
Commercial/
19936 Stevens less abiliYto be develo�ed into a __ _ _ �
- -�1r�a-�arlrn-r�I_,at ------ istii�f-tE s�te -(3ffic'ef- I'�G�Res - - - - -. -- - - -, .-- --- � - - - - - -- -- 8"9 -23- -Yd'- - - � - - -
Creek Blvd successful mixed use development in the
Residential
middle of the block that it is located on.
19900 Stevens Commercial/
Er --�l;�t��tttrr- --- ---- x�sEirtgH�site -(34fier{- �(CFr,4�es - �- - --�- - -�-- --�---- �- �C ---'�-- 3-9 2rr -4E� - .._. __ ._ _ -- � � �.�� , ---- --_. : __ �
Creek Blvd
Residential
Commercial/
United Fumiture 10025 E.Estates ExisHng HE site Office/ P(CG,Res) 0.92 25 � � �
Residential
Commercial/
7 United Furniture 10075 E.Estates Existing HE site Office/ P(CG,Res) � � � � � � � 0.53 25 58 Retain. � � �
Residential
Commercial/
United Fumiture 10075 E.Estates Existing HE site Office/ P(CG,Res) 0.86 25 1� � �
Residential
Commercial/
L7 East of E.Estates 19541 Richwood Dr. New site Office/ P(CG,Res) � � � � � � � 25 � � �
Residential
These three sites in conjunction with the
Commercial/ United Furniture site could allow a better
19550 Stevens
L7 East of E.Estates Creek Blvd New site Office/ P(CG,Res) � � � � � � � 25 45 designed mixed use development.Some � � �
Residential of these properties are owned by the same
familv ac thP TTnitPrl Fi�rnihirv citvc
Page 2 of 8
Potential Housing Element Sites-Housing Commission Workshop Exercise-February 12,2014
Legend: Legend:
� �Prioirty Sites based on Housing Commision Workshop Feedback(02/12/14) Site available but not specifically identified as Prioirty site at Housing Commission Workshop(02/12/14)
� � � � � �
� �Prioirty Sites with conflicting consensus based on Housing Commision Workshop Feedback(02/12/14) Extsti�tg-HF�si Site no longer available or does not meet criteria.
� � � � �
HCD's Development Potential Criteria Secondary Criteria-
SCS,Plan Bay Area&General Plan
� v
� �, �, Along Major ,� � ;; a,
Site Size& � v v � •� • v �
° � �- o Transportation � � � o °A
Current Realistic Ownership o. �, '� ,.� � ;� ,� x �
Site Current Existing � U v .. Routes with access to v Q `� � � �
Site Name Address T e of Site Land Use Potential for Potential& w � v � v NOTES � 3 3 U 3
No. yp Zonin Use o � � � � ° °
g Q � transit or located � v ° v �. ;; w
Designation Recycling Development � ,� � o �� � � � � � �e (�
Density � v U within 1/2 mile of v '� q q �
� � z VTA PDA Q � °-�' °= �
o � Q
�.
C.
-"-- v .,...�„_._.�.............�.,_....,.
Commercial/
L7 East of E.Estates 10055 Miller Ave New site Office/ P(CG,Res) � � � � J J � 25 � � �
Residential
Commercial/ This half acre site while is not ideal;is ,
19160 Stevens � J X ,� � X � 0.55 25 11 �ocated next to an existing affordable � � J �
8 Barry Swenson Site Existing HE site Office/ P(CG,Res) housing development and has generated �
Creek Blvd
Residential
some interest in the past from developers. �
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
Commercial/ I
Loree Center 10029 Judy Ave Existing HE site Office/ P(CG,Res) 0.43 25 � � �
Residential Property has recently been renovated and �
9 1� � � 1� � � � 27 retenanted.There is very little vacancy at
Commercial/ this center. I
19060 Stevens
Loree Center Existing HE site Office/ P(CG,Res) 0.86 25 � � � '
Creek Blvd
Residenrial
` I� � � � � � � � — — — — � � � — — — — — — � — — — — — — — � — � � � � � � � � � � � — � � — — � � — � � � — — —
Industrial/
,_,_ — �Yla�le�-B�es— —�05A0-grtr�e�idb x-i�i�iiE s:�e — - �n4u,� , � �_ __ __ r _ _. _. .+ ._ _... � -- . — —._ � — —— -��— �� r �. � s _ ,� � � � .� ___ � —. � _ � � s .._ a _
Residential
Entitlements obtained for an office
10 � X � � � � � 179 campus project(Apple Campus 2).
Industrial/ Construction underway.
.._ _ �,i•o�ey--eros— -�e4ee�'rur�ersd�g�-�xssti„�-I�-sitn —--—— — r`�Iv1�r.'es) —. _ � __ _ — —— —— — — — — — — — . — — — — — —— �9 -R�- _ �. __. _ � _ _ __ — � _ _ — — — — - — _ � _ �. � __
Residential
Med/High
Density
Glenbrook Apt. 10160 Parkwood F.�cisting HE site R3 11.62 25 � � �
Residential
11 (io-Zo� � J J J J J J 9s Retain.
Med/High
Density
Glenbrook Apt. 21297 Parkwood Existing HE site R3 19.72 25 � � �
Residential
10-20
Page 3 of 8
Potential Housing Element Sites-Housing Commission Workshop Exercise-February 12,2014
Legend: Legend:
Prioirty Sites based on Housing Commision Workshop Feedback(02/12/14) Site available but not specifically identified as Prioirty site at Housing Commission Workshop(02/12/14)
^ � � � � �
� � �Prioirty Sites with conflicting consensus based on Housing Commision Warkshop Feedback(02/12/14) E�eis4i�tg-�IF�-si Site no longer available or does not meet criteria.
� � � �
Secondary Criteria-
HCD's Development Potential Criteria
SCS,Plan Bay Area&General Plan
�
a a,
� �, �, Along Major y'� � ° v
Site Size& � � � � • ' °J �
Current Realistic Ownershi a, � •� o Transportation � � � � � � � �
Site Current Existing p � �j w Routes with access to �+ p U *'
Site Name Address Type of Site Land Use Potential for Potential& W � � v � � NOTES � o � o U o
No. Zoning Use o � � � �• „ �•
Desi ation Rec clin Develo ment �' '� ,� o transit or located � .N •� ro � � � �
� y g p � '� v v within 1/2 mile of v '� C �
m
Density � � z VTA PDA Q � �' �' "'
'o Q � Q
�.
c.
' — — — — — — — — — — — — — —Iv'rd/rtigh — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — � ♦
20800 Valley Green Density �
/ The Villages Apt. Dr Existing HE site Residential � 5.35 25 � � � `
� (10-20)
� Med/High
� 20975 Valley Green Density
The Villages Apt. Existing HE site R3 5.49 25 � � �
� Dr. Residential
( (10-20)
' Med/High
20990 Valley Green Density
12 The Villages Apt. Existing HE site R3 � J J � � � X 6.78 25 62 Retain. � � �
� Dr. Residential
� (10-20)
� Med/High
20800 Valley Green Density
� The Villages Apt. pr Existing HE site Residential � 2.69 25 � � �
� (10-20)
� Med/High
� 20875 Valley Green Density '
The Villages Apt. Existing HE site R3 6.79 25 J J �
� Dr. Residential '
♦ (10-20 �
� _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
offi�e,
20705 Valley Green Industrial/ P(CG,ML,
I 13 Carl Berg property Existing HE site � � 1� � � � � 7.98 25 169 Retain. � � �
Dr. Commercial/ Res)
t Residential
Property Owner Development Interest Sites (+Consolidation sites)
Property Owner
22690 Stevens Commercial/ Existing convenience store and
Pl Bateh Brothers Development P(CG) � � � X X � X 0.67 20-35 11-19 X X �
Creek Blvd Residential undeveloped site.
Interest
� Property Owner Shopping center.Additionally,24,000 s.f.
10825-10983 N CommerciaU
� P2 Cupertino Village Development P(CG,Res) J J � � � � � 10.8 35-45 321-413 commercial in two buildings and one X � �
Wolfe Rd Residential
� Interest parking garage approved.
Page 4 of 8
Potential Housing Element Sites-Housing Commission Workshop Exercise-February 12,2014
Legend: Legend:
Prioirty Sites based on Housing Commision Workshop Feedback(02/12/14) Site available but not specifically identified as Prioirty site at Housing Commission Workshop(02/12/14)
�.. � � � � �
� �Prioirty Sites with conflicting consensus based on Housing Commision Workshop Feedback(02/12/14) Exts4i�tg.�IE-si Site no longer available or does not meet criteria.
� � � � �
Secondary Criteria-
HCD's Development Potential Criteria
SCS,Plan Bay Area&General Plan
�
C a
� ti y Along Major � � ;: v
Site Size& � v � � •� • °J ^�
Current Realistic Ownership �,., � •� Fo Transportation � � � � o � � �
Site Current Existing � U v ,. Routes with access to v Q �
Site Name Address T e of Site Land Use Potential for Potential& w � v � U NOTES � 3 3 U 3
No. yp Zoning Use o ,��, Q w transit or located � .�'' � � o � o � o
Designation Recycling Development � � o � � ,� C7 � C7 � C�
Density y � v U within 1/2 mile of � � � � w
� �
� � z VTA PDA Q � 61 °=
o � � �
�
c.
Foothill C�McClellan Property Owner
10625 S Foothill Commercial/
P3 Center(Foothill Development P(CG) � � � X X X X 1.3 20-25 22-27 Strip mall. X X �
Blvd Residential
Market) Interest
Property Owner
10118 Bandley Commercial/
P4 Marina Plaza Development � � � � � � � 6.86 25-40 145-232 Commercial center � 35 DUA-� 40DUA-
Drive Residential
Interest
Property Owner
Stevens Creek Office 20823 Stevens CommerciaU
P5 Development P(CG,Res) � � J J � X � 6.31 35 241 Office complex X 35 DUA-� �
Center Creek Blvd Residential
Interest
Property Owner High Density
19500 Pruneridge Existing 342 unit apartment complex on 110 DUA
P6 'The Hamptons Development Residential P(Res) X � J J � � � 12.44 65-110 686-1162 X 65 DUA-� �
Ave �terest (20-35) site.
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
Property Owner Existing indoor mall with high vacancy ,
Commercial/ P(Regional J J � �
P7 Vallco Mall 10123 N Wolfe Rd Development � � J J � � � 32.9 35 600-800 rate with Sears and Macy's as anchor
Residential Shopping)
Interest tenants. '
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
Property Owner Commercial/
Summerwinds& 1471,1491&1505 S P(CG,IZes 5-
P8 Development Office/ � � X X X � � 413 25-40 87-140 Nursery and building materials retaiL � 35 DUA-� 40 DUA-�
Granite Rock" De Anza Blvd 15)
Interest Residential
Property Owner Commercial/
1451 S.De Anza P(CG,Res 5-
LP8 Jack in the Box Development Office/ � � X X X � � 0.44 25-40 9-14 Jack in the Box � 35 DUA-� 40 DUA-�
Blvd Interest Residential 15)
Quasi-public/
Wonderland Chinese Property Owner
10931 and 10921 Institutional& Pre-school/Aftervschool care and single
P9 School and 10921 Development BQ/K1-10 � � X X � X X 1.83 20-25 31-38 X X 25 DUA-�
Maxine Ave Low Density family residence
Maxine Interest
Residential
Property O��ncr
Marketplace Shopping 19750 and 19620 Commercial/ Three newer and one older commercial
P10 Development P(CG,Res) � X � � J J �1 9.92 2�-35 210-295 �� � �
Centcr Stevens Creek Blvd Kcsidential building
Interest
Page S of 8
Potential Housing Element Sites-Housing Commission Workshop Exercise-February 12,2014
Legend: Legend:
�— Prioirty Sites based on Housing Commision Workshop Feedback(02/12/14) Site available but not specifically identified as Prioirty site at Housing Commission Workshop(02/12/14)
� � � � � �
� �Prioirty Sites with conflicting consensus based on Housing Commision Workshop Feedback(02/12/14) E�re:s4it1�HE-si Site no longer available or does not meet criteria.
� � � � �
Secondary Criteria-
HCD's Development Potential Criteria
SCS,Plan Bay Area&General Plan
� �
� y y Along Major w � '�.° �
Site Size& � v ?; Q • ' °1 ^�
° a- �- o Transportation � � � o °q
Current Realistic Ownershi Q. � '� � � � � � :� x �
Site Current Existin p � 01 v � Aoutes with access to �+ Q e° *'
Site Name Address Type of Site Land Use g Potential for Potential& w �, � a � � � NOTES � o � o U o
No. Zoning Use o :�-� � C � .a,.' �•
,. transit or located aw,, �. v ..
Designation Recycling Development � ,� � o �� � ,e C� ;� C� � C�
Densit � v U w i t h i n 1/2 m i l e o f v ';� � � �
y � � z VTA PDA Q � " °=
�o � ¢ �
�.
a
Sites Identified at Housing Element Workshops (1/23/14 and 2/12/14)
� � � � � � � � � � � � � � � �eigTi6orTioo� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
21731 Stevens Creek Additional �
21731 Stevens Commercial, P(CN,ML,
� Wl Blvd(Next to Post Potential Site � � X � � X � 0.62 4.4-12 2-6 Strip mall � � � '
Office Creek Blvd orksho �dustrial& Res 4.4-12)
� � � p� R 'd ia �
76 Gas Station/Office Additional
10625 N De Anza Commercial/ P(CG,ML,
W2 Bldg(DeAnza and Potential Site � X X � � � � 0.7 25 10 76 Gas station and adjacent office building � � �
Blvd Residential Res)
Valley Green) (Workshop)
Additional
Commercial/
W3 Abundant Life Church 10100 N Stelling Rd Potential Site P(CG,Res) J J � � � X � 3.8 25 80 Church&Pre-school � � �
IZesidential
Worksho )
Additional
Caltrans Maintenance Industrial/
W4 10730 Bubb Rd Potential Site ML-rc J J � � � X � 2.93 20 49 Caltrans Corp.Yard � � �
Station Residential
(Worksho )
Additional Bulk of site recently renovated.Rest of site
10041 S De Anza Commercial/
W5 Cupertino Crossroads Potential Site P(CG,Res) � X � � � � � 14.7 25 312 mostly tenanted with one or two � � �
Blvd Ilesidential
(Worksho ) vacancies.
Cupertino Financial Additional
Commercial/ P(CG,OP, Office buildings recently acquired by JP
W6 Center(NE corner of 10050 N.Wolfe I2d Potential Site � X � � �1 � � 4.44 25 94 � � �
Residential Res) Morgan.
Wolfe and SCB) (Worksho )
Additional
10050 S De Anza Commercial/ Hotel with property lines contiguous with
W7 Cypress Hotel Potential Site P(CG,Res) � X X � � X � 1.32 25 28 � � �
Blvd llesidential hotel and parking garage.
(Worksho )
Good Samaritan Additional
19624 Homestead Quasi-public/
W8 Church(Homestead& Potential Site BQ � � X � � � � 1.36 25 28 Church � � �
Rd Institutional
Wolfe) (Worksho )
10857,10867,10877, Additional
Evulich Ct @ Linda Low Density Single family homes and undeveloped
W9 ]0887 Linda Vista Potential Site R1-7.5 � � � X X � X 2.49 5 10 � � �
Vista Dr Residential land.
Dr (Worksho )
Additional
Homestead Lanes+ 20916,20956,20990 Commercial/ P(Rec,Enter)
W10 Potential Site J J � � � � � 4.61 20-35 78-137 Strip malls and bowling alley. � � �
Adjacency Homestead Rd Residential &P(CG)
(Worksho )
Homestead Road- 21020,21040,21060,
Additional
IntraHealth/Office/ 21070 Homestead Commercial/ Office and commercial buildings,tennis
wl� Porenrsai s�re i��cc� J J J ,� J ,� ,� s.42 15 69 J ,� J
Tennis Courts Rd&APN:326 07 Residential courts and parking lot.
(Homestead/Stelling) 022,326 07 036 �Workshop)
Page 6 of 8
Potential Housing Element Sites-Housing Commission Workshop Exercise-February 12,2014
Legend: Legend:
Prioirty Sites based on Housing Commision Workshop Feedback(02/12/14) Site available but not specifically identified as Prioirty site at Housing Commission Workshop(02/12/14)
^ � � � � �
� �Prioirty Sites with conflicting consensus based on Housing Commision Workshop Feedback(02/12/14) Exis!'tng-�IE-si Site no longer available or does not meet criteria.
� � � � �
HCD's Development Potential Criteria Secondary Criteria-
SCS,Plan Bay Area&General Plan
�
..
a v
� y y Along Major ,� � '�.° v
Site Size& � v v ¢ • • 01 �
Current Realistic Ownership �,, � •� lo Transportation � � C o °A
Site Current Existin � v �,�. Routes with access to v �? � � � � x �
Site Name Address Type of Site Land Use g Potential for Potential& w � � v � � � NOTES Q o � o V o
No. Zonin Use o � � � ;; �.
Designation g Recycling Development y .� � o transit or located ,N •� � � � � � �
Densit � � U w i t h i n 1/2 m i l e o f v ��y G � �
Y � � z VTA PDA Q � °1 °1
�
o � � Q
�.
�,
Main St(SCB btwn Additional Commercial/ P(CG,OP, Property has entitlements and is under
W 12 APN:316 20 109 Potential Site � X � � � � � ll.57 25 245 construction for a mixed use office and � � �
Finch/Tantau) Residential Res)
(Workshop) commercial development and a hotel
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
Additional Property has entitlements for a mixed use �
21255 Stevens Comtnercial/
W13 Oaks Shopping Center Potential Site P(CG,Res) � � � � � � � 7.9 25 167 office/commercial building and a hotel � � � �
Creek Blvd Residential
(Workshop) which expires in Sept 2014. �
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
Additional
PG&E Corporation Quasi-public/ PG&E has not shown an interest in
W14 10820 N Blaney Ave Potential Site BQ � X � � � � � 21.6 N/A N/A X X X
Yard Institutional redeveloping this property.
(Worksho )
Additional
PG&E Lower California Oak Way Quasi-public/ PG&E has not shown an interest in
W15 Potential Site A � X � X X X X 10.56 N/A N/A X X X
Substation (APN:342 12 030) Institutional redeveloping this property.
(Workshop)
Portal Plaza Additional
19900 Steven Geek Commercial/
W16 (between Portal and Potential Site P(CG,Res) � � J J J J � 5.22 25 110 Commercial center with no vacancies. � � �
Blvd Residential
Perimeter) (Worksho )
Neighborhood
Additional
21701 Stevens Commercial, P(CN,ML,
W17 U.S.Yost Office Potential Site � X X X � � � 5.24 4.4-12 18-52 Owned by the US Postal Service. � � �
Creek Blvd Industrial& Res 4.4-12)
(Workshop)
Residential
Additional
St.Joseph's Place(Cafe 20375 Stevens Commercial/
W78 Potential Site P(CG,Res) � � � � � X � 2.2 25 46 Commercial center with no vacancies. � � �
Torre site) Creek Blvd Residential
(Worksho )
Additional Church with a historic designation.This
Union Church of 20900 Stevens Commercial/
Wl9 Potential Site P(CG,Res) � X � � � X � 3.05 25 63 site has also recently added a facility to � � �
Cupertino Creek Blvd Residential
(Worksho ) increase services.
Existing 122 unit apartment complex.
Additional High Density
Village Green 21230 Homestead Developed at a density of-16 DU/acre.
W20 Potential Site Residential R3 X X � � � X � 7.5 20-35 137 � � �
Apartments Rd Open space availability needs to be
(Workshop) (20-35)
evaluated.
Neighborhood
Additional
Vivi's Falafel 21771 Stevens Commercial, P(CN,ML,
W21 Potential Site � � X � � � � 0.44 4.4-12 1-4 Strip mall �l � �
(next to Post Officc) Creek Blvd Industrial& Res 4.4-12)
(Workshop)
Residential
1 `
19376,19400,19450
Jiffy Lube+Office Blds Additional Commercial/ �
dt 19480 Stevens Various office buildings and service uses
�W22 (SE of Stevens Creek Potential Site Office/ P(CG,Res) � � J J � � �I 5.21 25 110 � � � I
Creek Blvd&10062 (jiHy lube) ,
' Blvd and Miller) Miller Ave �Workshop ti2) Residential
` � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
Page 7 of 8
Potential Housing Element Sites-Housing Commission Workshop Exercise-February 12,2014
Legend: Legend:
Prioirty Sites based on Housing Commision Workshop Feedback(02/12/14) Site available but not specifically identified as Prioirty site at Housing Commission Workshop(02/12/14)
�... � � � � �
� � � � � � �Prioirty Sites with conflicting consensus based on Housing Commision Workshop Feedback(02/12/14) ExisFea�IB-si Site no longer available or does not meet criteria.
Secondary Criteria-
HCD's Development Potential Criteria
SCS,Plan Bay Area&General Plan
�
+.
v � � �
� �, y Along Major � � �• v
Site Size& � �, � � � '� .� �
° � o Transportation � �s o
Current Realistic Ownership o. v �� ,� � � � � � .� x �
Site Current Existing � V v „ Routes with access to v Q
Site Name Address Type of Site Land Use Potential for Potential& w � v � � � NOTES ¢ o � o U o
No. Zoning Use o �'' � � transit or located � � v �. v �• °: �•
Designation Recycling Development � ,� � o �� � � C7 R C7 � C7
Densit � v U within 1/2 mile of v �� � � �
y � � z VTA PDA Q � � °=
o � Q Q
�
c,
� _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
19200,19220& Additional Commercial/ Citibank,Sunflower Leaming Center,and ,
I W23 Opposite Main Street 19280 Stevens Potential Site Office/ P(CG,Res) � � � � � � � 4.98 25 105 older office blds � J J '
` Creek Blvd (Workshop#2) Residential �
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
Modern Furniture+ Additional Commercial/
W24 Barn NE corner of SCB 20149 Stevens Potential Site Office/ P CG,Res
� Creek Blvd � � J � � � � X � 0.63 25 13 Modern Furniture store � � �
and Randy Ln) (Workshop#2) Residential
JC Penney+Parking
Additional
Lot site(NE corner of 10150 N.Wolfe Itd Commercial/ P(Regional
W25 Potential Site � � � � � � � 14.93 35 444 JC Penney and Parking Lot � � �
N.Wolfe Road and &APN:316 20 092 Residential Shopping)
Vallco Parkwa (Workshop#2)
Additional Commercial/
20745 Stevens
W26 Target Potential Site Office/Residene P(CG,Ites) � X � � � X � 8.26 25 175 Target � �l �
Creek Blvd
(Worksho ) ntial
Additional
Park Circle 4-plexs Bound by Beardon
W27 Potential Site Res MH(10-20) IZ3 X X � � � X � 7.1 20 120 Residential Duplexes � � �
(North of Target) Dr.&Bandley Dr.
(Worksho )
Additional Commercial/
19330 Stevens
W28 Kalio Potential Site Office/ P(CG,Res) � � � � � � � 0.84 25 17 Two story office building � � �
Creek Blvd
(Workshop) Residential
*-Site previously erroneously listed as Yamagami's Nursery Site
Page 8 of 8