Loading...
HomeMy WebLinkAboutAH Summary 08-09-2018OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE o CUPERTINO, CA 95014-3255 (408) 777-3308 FAX (408) 777-3333 planning�a cupertino.org To: Mayor, and City Council Members Planning Commissioners From: Benjamin Fu, Assist. Director of Community Development Date: August 15, 2018 Subj: REPORT OF ADMINISTRATIVE HEARING DECISION MADE August 9, 2018 Chapter 19.12.170 of the Cupertino Municipal code provides for Appeal of decisions made at an Administrative Hearing 1, Application R-2018-20, INT -2018-01, Clayton Johnson (Premier Builders), 10550 Bette Ave Description Front Yard Interpretation to consider designating the street side property line (Bette Avenue) as the front lot line to allow for a 198 square foot addition to the first floor and a Two Story Permit to consider allowing a 980 square foot second floor to an existing single -story residence. Action The application was approved at the Administrative Hearing. The approval is effective August 9, 2018. The fourteen -calendar day appeal will expire on August 23, 2018. Enclosures: Administrative Hearing Report of August 9, 2018 - Resolution No(s) 92,93 Plan set 2. Application ASA -2018-08, EA -2018-05, Bernard baker (Apple Inc), 19020 Pruneridge Ave Description Architectural and Site Approval to consider a proposed 85,247 square foot office building including revisions to the parking structure, from above grade to below grade, for a previously approved office, research and development campus (Apple Park Phase 2- Tantau 14) Action The application was approved at the Administrative Hearing. The approval is effective August 9, 2018. The fourteen -calendar day appeal will expire on; August 23, 2018. ' Enclosures: Administrative Hearing Report of August 9, 2018 Resolution No(s) 94, 95 Plan set SUBJECT COMMUWTV DEVELOPMENT DEPARTMENT PLANN9 NG ®IIVIISIION CITY HALL 10300 TORRE AVENUE - CUPERTINO, CA 95014-3255 TELEPHONE: (408) 777-3308 © FAX: (408) 777-3333 CUPERTINO.ORG ADMINISTRATIVE HEARING 4'"1 r A ! REPORT p iOa y Agenda Date: August • Front Yard Interpretation to designate the property line along Bette Avenue as the front lot line to allow for a 198 square foot addition to the first floor and a Two Story Permit,to allow a 980 square foot second floor to an existing single -story residence. (Applications: INT -2017-01. and R-2018-20; Applicant: Clayton Johnson, Premiere Builders; Project Location: 10550 Bette Avenue; A.P.N.: 369-26-016) RECOMMENDED ACTION That the Hearing Officer adopt the Draft Resolutions to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve applications INT -2017-01 for a Front Yard Interpretation and R-2018-20 for a Two Story Permit (Attachments 1 and 2). DISCUSSION Project Data: Special Area/Neighborhood South Blaney Neighborhood General Plan Designation Low Density Residential (1-5 DU/Acre) Zoning Designation R1-10 (Single -Family -Residential) Allowed/Required Existing Proposed ]Lot. Size 6,657 sq. ft. (0.15 acres) ]Lot Coverage 50% 32% 35% Proposed Size 2,996 sq. ft. 1,745 sq. ft. 2,923 sq. ft. ]First Floor - 1745 sq. ft. 1,943 sq. ft. Second Floor - 0 sq. ft. 980 sq. ft. F.A.R. 45% 26% 44% Vt Floor Setbacks Front 20' 18'-5" 20'-5" Rear 20", 22'-10" 22'-10" Street Side 12' 15' 15' Interior Side 5' 14'-8" 5'-9" 2nd Floor Setbacks Front 25' - 25' Rear 25' - 25' Street Side 12' - 23'-4" Interior Side 20' - 20' Total Building Height 28' 13'-7" 23'-10" Project Consistency With: General Plan Yes Zoning Yes (upon approval of the Front Yard interpretation) Environmental Review Categorically Exempt per Section 15301 of the California Environmental Quality Act (CEQA) Background: Proposed Project: Site Description: The property is located at the southeast corner of Bette and Glenview Avenues in the South Blaney neighborhood (Figure 1). The existing 1,745 square foot single -story home is located in a residential zoning district and is surrounded on all sides by single-family residences. Chapter 19.08 of the Municipal Code defines the front lot line on a corner lot as the shorter lot line abutting a street. For the subject property, the lot line on Glenview Avenue measures 55 feet and the lot line on Bette Avenue measures 70 feet. Therefore, in accordance with the City's Municipal Code, Glenview Avenue is considered the front lot line. Although the proposed addition it is not consistent with the City's current Zoning ordinance, the Municipal Code recognizes that in certain cases, the definition of the front lot line may be modified, particularly when it improves the design relationship of the proposed buildings/additions to adjacent buildings and development, or if there is a pattern of corner lots within the subdivision where the required street side yard is functionally :the property's front yard. Therefore, the applicant has applied for a front yard interpretation. Analysis: Front Yard Interpretation The proposed project is consistent with the General Plan. It is also consistent with the Single -Family Residential (R1) Ordinance of the Cupertino Municipal Code in all respects, should a Front Yard Interpretation be approved. Setback requirements are intended to establish a consistent pattern of development and to improve the interface between the street and building frontage. There is a pattern of corner lot residences within the original tract, approved in 1959, along Glenview Avenue in the South Blaney neighborhood (between East Estates Drive and Oakville Avenue) that have functional front yards along the longer lot line. Specifically, 6 out of the 12 corner lot residences (including the existing residence on the project site) are oriented towards the longer lot line (see Attachment 4). Many of these homes were built in the 50's and 60's under the City of Cupertino's earlier zoning standards, when an applicant with a corner lot could choose which street to place the front setback along. This is no longer allowed and therefore, these homes are considered legal, non -conforming. Further, the proposed building orientation is consistent with the original front yard setback requirements for the property prior to any street dedications, matching other neighboring properties in the area. A Front Yard Interpretation to designate the property line along Bette Avenue as the front lot line does the following: 1. Reinforce the residential building relationship as established by the original development of this subdivision; 2. Eliminate the non -conforming status of the existing residence due to the existing front and rear yard setback encroachment per Cupertino regulations; 3. Maintain the frontage orientation of the surrounding properties; and 4. Improve the relationship of existing residences and future developments. Two -Story Permit The project includes a Two Story Kermit application for the addition of a second floor to the existing single -story residence (see Attachment 3). The second story to first story ratio for the proposed project is 50.43%. Therefore, design review is not required for this project. The setbacks, height, and building size that are proposed comply with the development standards and applicable Residential Design Guidelines in Cupertino Municipal Code Chapter 19.28: Single -Family Residential (R-1) Zones. The proposed addition is also compatible with existing homes in the neighborhood. The property owners are proposing to plant privacy protection trees along the east (rear) property line to screen views from the second story windows with sill heights that are five feet or less from the finished floor. Additionally, a new front yard tree is proposed to be planted on the property to mitigate the building mass of the new second -story addition from the public right-of-way in compliance with Section 19.28.120 of the Municipal Code. Environmental 'Review This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15301(e) — Existing Facilities because the exemption applies to the addition of up to 10,000 sq. ft. in an area where all public services _ and facilities are available to allow for maximum development permissible in the General Plan and the project is not located in an environmentally sensitive area. PUBLIC NOTICING AND COMMUNITY OUTREACH The following table is a brief summary of the noticing done for this project: 'Y`"afif.:in` �ra� $ .,.. ,�5� i �..t S�tty �4`:, "'� 7.`t"yii' H"v .xd��-�.ri?>s.$'i 3xf �Yr"3 y,i .,"z, '4',a� �sa.&, h5'F o b aa? '�3iuf {;�..� A"`v ,�{{tt i$i v 3,'��w�,?��77z ��j��{.�.y 3. l„�'� £S i9: f `��n(' h �� ,S s� /�f4 NN 've.P®W�'f:.'y��zf P'V1Lb JL.11'�6 c��e�L3n."��LL���`JL W '. ={Sv4kY,�h,.>.. fS�Ynar:.w..'sS,Eos,:s,.:�mhfR7. £.f�.Fr:2:o^✓r�`',ciK'�4:e, "5.., ,-.nt'2iY�:k' P,�aH?'�3'S a h1 -,Y �,�' , 3�^.di..'. �," T7"ti*a Y..si $` Y' %'^ ''Z. i9' ,,p9 i -s..! ''r. G �,xY,rs..'.- 5 i�^;,',,P.i (f'3.:`x % L �;. +Y F�...: 'kid di1'."x^`4y'f2�..P3 3' ® y ! E I' 5cvdsg, �lr� >k ,f.j�i{P §34ff'it€SP��£Ij R�(p�S ES �'YS f6HSF' 7,t ..,,v.V,„v fc.,� ® Site Signage (10 days prior to hearing) ® Posted on the City's official notice ® 8 notices mailed to property owners bulletin board (one week prior to hearing) adjacent to the project site (10 days e Posted on the City of Cupertino's Web prior to hearing) site (one week prior to hearing) No public comments were received at,the time of production of this staff report. PERMIT STREAMLINING ACT This matter is adjudicatory and is subject to the Permit Streamlining Act (Government Code. Section 65920 — 65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received: May 8, 2018; Deemed Incomplete: June 4, 2018 Project Resubmitted: June 26, 2018; Deemed Complete: July 3, 2018 The City has 60 days (until September 3, 2018) to make a decision on the project. CONCLUSION Staff recommends approval of the Front Yard Interpretation and Two Story Permit because the project is consistent with the General Plan, and zoning ordinances, and conforms to the single-family residential development pattern, in accordance with Chapter 19.28 of the Cupertino Municipal Code. Additionally, all of the findings for approval of the proposed project, consistent with the Cupertino Municipal Code, may be made as reflected in the Draft Resolutions. NEXT STEPS The permit will be effective 14 calendar days from the date of the hearing. The decision of the Administrative Hearing Officer is final, unless appealed within 14 calendar days from the date of the hearing. The applicant may apply for building and/or other permits with the City at the end of the appeal period. This approval is valid until August 9, 2019. The applicant may apply for a one-time one year extension before the approval expires. Prepared by: Gian Paolo Martire, Associate Planner Reviewed By: Piu Ghosh, Principal Planner ATTACHMENTS 1. Draft Resolution for INT -2017-01 2. Draft Resolution for R-2018-20 3. Plan Set 4. Glenview Avenue Corner Lot Survey CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 92 OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO TO ALLOW TWO STORY PERMIT FOR A 980 SQUARE FOOT SECOND STORY ADDITION TO AN EXISTING SINGLE -STORY RESIDENCE LOCATED AT' 10550 BETTE AVENUE (A.P.N 369-26-016) SECTION I: PROJECT DESCRIPTION Application No.: R-2018-20 Applicant: Clayton Johnson (Premiere Builders) Location: 10550 Bette Avenue (A.P.N 369-26-016) SECTION II: FINDINGS FOR A TWO-STORY PERMIT: WHEREAS, the City of Cupertino received an application for a Two -Story Permit as described in Section I of this Resolution; and WHEREAS, the project is categorically exempt from the California Environmental Quality Act (CEQA); and WHEREAS, the necessary notices have been given in accordance with the Procedural Ordinance of. the City of Cupertino, and the Administrative Hearing Officer has held one or more Public Hearings on this matter; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds: a) The project is consistent with the Cupertino General Plan, any applicable specific plans, zoning ordinance and the purposes of this title. The proposed project is consistent with the General Plan as the project is within the Low Residential (175 DU/acre) land use area. There are no applicable specific plans that affect the project. As the Front Yard Interpretation has been approved, the project has been found to be Resolution No. 92 R-2018-20 August 9, 2018 Page - 2 - consistent with the requirements of Cupertino Municipal Code Chapter 19.28 Single Family (R-1) Residential. b) The granting of the permit will not result in a condition that is detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety or welfare. The granting, of the permit will not result in a condition that is detrimental or injurious to property improvements in the vicinity, and will not be detrimental to the public health, safety or welfare as the project is located within the R1-10 (Single Family Residential) zoning district, and will be compatible with the surrounding uses of the neighborhood. c) The proposed project is harmonious in scale and design with the general neighborhood. The proposed project is located in a residential area consisting of single family homes. The proposed project maintains the single family home scale found compatible with the general neighborhood. d) Adverse visual impacts on adjoining properties have been reasonably mitigated. Any potential adverse impacts on adjoining properties have been reasonably mitigated through the installation of privacy protection plantings and front yard trees as required. NOW, THEREFORE; BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on Page 2 thereof, the application for a Two -Story Permit, Application no. R-2018-20, is hereby approved; and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the Public Hearing record concerning Application no. R-2018-20 as set forth in the Minutes of Administrative Hearing Meeting of August 9, 2018, and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set entitled, "Bette Ave Residence Addition, 10550 Bette Ave., Cupertino, CA 95014," drawn by D -Square Studio dated. March 1, 2017 consisting of eight (8) sheets labeled A-0.0 through A-5.0; and the boundary survey entitled, "Site Plan/Boundary Survey certified by John K. King dated April 19, 2018 Resolution No. 92 R-2018-20 August 9, 2018 Page - 3 - consisting of one (1) sheet; except as may be amended by conditions in this resolution. 2. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the building plans. 3. ACCURACY OF PROTECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations; building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 4. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no R-2018-20, shall be applicable to this approval 5. PRIVACY AND FRONT -YARD TREE PLANTING The final privacy and front -yard tree planting plan shall be reviewed and approved by the Planning Division prior to issuance of building permits. The variety, size, and planting distance shall be consistent with the City's requirements. 6. PRIVACY AND FRONT -YARD TREE PROTECTION COVENANT The property owner shall record a covenant on this property to inform future property owners of the privacy protection measures and tree protection requirements consistent with the R-1 Ordinance, for all second floor balconies and windows with views into neighboring yards and a sill height that is 5 feet or less from the second story finished floor. The precise language will be subject to approval by the Director of Community Development. Proof of recordation must be submitted to the Community Development Department prior to final occupancy of the residence. 7. EXTERIOR BUILDING MATERIALSUREATMENTS Final building exterior treatment plan (including but not limited to details on exterior color, material, architectural treatments and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The final building exterior plan shall closely resemble: the details shown on the original approved 'plans. Any exterior changes determined to be substantial by the Director of Community Development shall require a minor modification approval with neighborhood input. Resolution No. 92 R-2018-20 August 9, 2018 Page - 4 - 9. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 10. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the "indemnified parties") from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this. Resolution or any permit or approval authorized_ hereby for the project, including (without limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys' fees and costs within. 30 days following receipt of invoices from City. Such attorneys' fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 11. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this,, -90 -day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. Resolution No. 92 R-2018-20 August 9, 2018 Page - 5 - PASSED AND ADOPTED this 9th day of August, 2018 at a noticed Public Hearing of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: /s/Dian Paolo Martire /s/Bedamin Fu Gian Paolo Martire Benjamin Fu Associate Planner Asst. Director of Community Development CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 93 OF THE ADMINISTRATIVE HEARING OFFICEROF THE CITY OF CUPERTINO TO ALLOW A FRONT YARD INTERPRETATION TO DESIGNATE THE PROPERTY LINE ALONG BETTE AVENUE AS THE FRONT LOT LINE TO ALLOW FOR A 198 SQUARE FOOT ADDITION TO THE FIRST FLOOR AND A 980 SQUARE FOOT ADDITION OF A SECOND FLOOR TO AN EXISTING SINGLE -STORY, RESIDENCE LOCATED AT 10550 BETTE AVENUE (A.P.N 369-26-016) SECTION 1: PROTECT DESCRIPTION Application No.: INT -2018-01 Applicant: Clayton Johnson (Premiere Builders) Location: 10550 Bette Avenue (A.P.N 369-26-016) SECTION II: FINDINGS WHEREAS, the City of Cupertino received an application for a Front Yard Interpretation to designate the property line along Bette Avenue. as the front lot line and to permit a 198 square foot addition to the first. floor and a 980 square foot addition of a second floor to an existing single -,story residence; and, WHEREAS, the project is categorically exempt from the California Environmental Quality Act (CEQA);. and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one .public meeting in regard to the application; and WHEREAS, the, applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds that: 1. The project is consistent with the Cupertino General Plan, any applicable specific plans, zoning ordinance, and the purposes of the R1 Ordinance; and The proposed project is consistent with the existing residential land use designations surrounding the site and is consistent with Title 19, Zoning, and Chapter 19.28., Single -Family Resolution No. 93 INT -2018-01 August 9, 2018 Page 2 Residential (R1) Ordinance, of the Cupertino Municipal Code for setbacks, lot coverage, floor area ratio, and other development standards. 2. The proposed project is harmonious in scale and design with the general neighborhood; and The interpretation will reinforce the existing residential building relationship as established by the original development when the property was in the City of Cupertino in 1959, eliminate the non -conforming status of the existing residence under. the Cupertino Municipal Code, maintain the frontage orientation of the subject site and surrounding properties, and improve the relationship of existing residences and future developments. 3.' The granting of the permit will not result in a condition that is detrimental or injurious to.property or improvements in the vicinity, and will not be detrimental to the public health, safety, or welfare. No changes to site access are proposed. Therefore, there is no change or impact to the surrounding neighborhood due to access to and from the site. The proposed project meets all required setbacks of the R1 zoning district and the Zoning Title. Therefore, the proposed project will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, or welfare. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony, and other evidence submitted in this matter, the Hearing Officer of the Administrative Hearing does determine that, Application No. INT -2018-01, is categorically exempt from CEQA; and approves said application; and That the subconclusions upon which the findings and conditions specified in Section III of this Resolution are based and contained in the public meeting record concerning Application No. INT -2018-01 as set forth in the Minutes .of the Administrative Hearing Meeting of August 9, 2018, and are incorporated by reference herein. SECTION III: -CONDITIONS ADMINISTERED BY. THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set entitled, "Bette Ave Residence Addition, 10550 Bette Ave., Cupertino, CA 95014," drawn by D -Square Studio dated March 1, 2017 consisting of eight (8) sheets labeled A-0.0 through A-5.0; and the boundary survey entitled, "Site Plan/Boundary Survey' certified by John K. King dated April 19, 2018 consisting of one (1) sheet; except as may be amended by conditions in this resolution. Resolution No. 93 INT -2018-01 August 9, 2018 Page 3 2. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the building plans. 3. ACCURACY OF PROTECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements, and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. - 4. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no R-2018-20, shall be applicable to this approval. 5. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 6. FRONT YARD INTERPRETATION An Interpretation is granted to allow the lot line adjoining Bette Avenue to be considered the front lot line. Any future additions or modifications to the residence shall be consistent with the interpretation of the lot line adjoining Bette Avenue as the front lot line. 7. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the "indemnified parties") from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys' fees and costs within 30 days following receipt of invoices from City. Such attorneys' fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other Citystaff overhead costsand any costs directly related to the litigation reasonably incurred by City. Resolution No. 93 INT -2018-01 August 9, 2018 Page 4 8. NOTICE OF FEES DEDICATIONS RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 -day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 9th day of August, 2018 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: /s/Gian Paolo Martire Gian'Paolo Martire Associate Planner APPROVED: /s/Benjamin Fu Benjamin Fu Assistant Director of Community Development 71 Community Development ' � ztmen REt)' L � ^2 CUP' X040 APPROVED a Se #R-201,8'--20 ADDITION Application Cit€mbe.r(s)- NOTES - : GENERAL 105150 BETTE AVE " Approval Body:Admin Hearing A. ALL TREE PROTECTIVE FENCING SHALL BE.INSTALLED & - ,fir qqq - Aprpg� qq�pp•� q�ysat _ - 08/13/18 SHALL REMAIN IN UT CONSTRUCTION. PLACE THRGUGHOUT CONSTRUCTION. PLACE SHALL C g P E RT � (� ((; O.9 CA ..,9 50 V'1 4 jlt�l/l IIl'� u 7 "" ' """....................._.............. - .. B. NO CONSTRUCTION EQUIPMENT OR PRIVATE VEHICLES PARK OR BE STORED THE F ANY O ON -THE SITE ORDINANCE PROTECTED TREES ON THE SITE TR - GENERAL NOTES - ~ OV Sigmature Gian PaoloED APPROVED NUMBERS OR ADDRESSES SHALL BE PLACED ON 5 $ - M C. ALL NEW AND EXISTING BUILDINGS IN SUCH A POSITION AS TO VISIBLE FROM THE STREET OR RKSHALL BE REPORTED TDISCOVERED 1. ALL WORK SHALL BE IN ACCORDANCE WITH THE CALIFORNIA CODE OF 9. MATERIALS SUSPECTED OF DURING THE PROGRESS OFTHE WORK FTHE TUNTILL N B� $ a` T " BE PLAINLY AND LEGIBLE ROAD FRONTING THE PROPERTY. NUMBERS SHALL - THE O OWNER AND AS IDENTIFIREGULATIONS (TITLE 24) AND ALL OTHER LOCAL CODES AND ED UNDER NANCES HAVING WORK N THAT PARTICULAR AREA HALL BELSUSPENDED a) l�fr) - - CONTRAST WITH THEIR BACKGROUND. GOVERNING AUTHORITY JURISDICTION, APPLICABLE CODES ON THIS SHEET. IT IS THE INTENTOF THESE DOCUMENTS TO TESTS THE SUSPECT MATERIAL AND IT IS FOUND TO BE SAFE, OR UNTIL THE W COMPLYTHERETO. ": ` SUSPECT MATERIAL HAS BEEN PROPERLY ABATED. Q Cr - - " D. ALL UTILITIES FOR NEW CONSTRUCTIONSHALL BE UNDERGROUND. FOR REMODELS AND RENOVATIONS, CHECK 2 ALL DRAWINGS ARE TO BE USED IN CONCERT Wirth EACH OTHER. 10. CONTRACTOR SHALLVERIFY AT SITE ALL EXISTING CONDITIONS PRIOR TO � p _ C, W1 LOCAL JURISDICTIONS.. CONTRACTOR DISCOVERS ANY. DISCREPANCY BETWEEN THE DOCUMENTS, HE SUBMITTAL OF BIDS. SITE VISITS DURING BIDDING SHALL BE COORDINATEDd- OWNER IN ACCORDANCE WITH PROVISIONS OF THE SPECIFICATIONS. FOR PRIVACY 30% ANGLE ON :EACH SIDE WINDOW :"" SHALL PROMPTLY REQUEST FROM THE DESIGNER CLARIFICATION OF GOVERNING WITH THE FOR EXACT PLACEMENT, _TREES - ✓ ✓ FOR -ALL WINDOWS ON"SIDE AND REAR WITH SILLS MORE /(✓ CRITERIA. REFER TO THE ARCHITECTURAL DRAWINGS AND COORDINATION OF WORK INFORMATION SHOWN IN THE 11. PROTECT WORK LUDIN DAMAGED WORK 0. R A THAN 5' ABOVE FINISH SECOND "FLOOR AND ROOF DEC I I 2 % I SHALCONTLBEREPLACTOR ORIENTATION D SALEXISTING MER LARGEST GRAPHIC ARE INTENDED TO SUPPLEMENT INFORMATION OF SMALLER, SHALL 8E REPLACED WITH THE SAME MATERIALS; INCLUDING MATCHING THE - I I ,• - /' "� '�'�'°,; r/" - -�'� ROPERTY LINE- 90' / I - EXISTING COLORS AND TEXTURES PRECEDING REFERENCE DRAWINGS -'- I T. AN-1,PRESS t ,. 1..� 2' PU _ _ -- _ 3. NOTATIONS MARKEOTYPICAL' P. SHALL BE CONSISTENTTHROUGHOUT ALL 12. CONTRACTORS) SHALL BE RESPONSIBLE FORTHEIR OWN CLEANUP AS WORK '-';.--,o-=�•r `x,1ThJ CYPRS[' j Fill" SUCH REFERENCE NOMENCLATURE SYMBOLS AND DRAWING INDICATIONS OF PROGRESSES. i -`-a r'-'"�.. 1 EASEME T ADPGIE w CLAIMED PE LIKE OR SIMILAR KIND. - 13. ALL WORK IS NEW UNLESS OTHERWISE NOTED. I I I I L O.1R UI wI I I I - HE ' THE CONTRACTOR SHALL FIELD VERIFY 4. DONOTSCALETDRAWINGS. CONSTRUCTIONCONDITIONS AND DIMENSIONS PRIOR TO ORDERING, 14. GRADING PLANS, DRAINAGE IMPROVEMENTS, ROAD AND ACCESS AND ENVIRONMENTAL HEALTH CONSIDERATIONS SHALL {•• /j FABRICATING, AND INSTALLATION OF ANY ASSOCIATED WORK. IF DISCREPANCIES REQUIREMENTS, ARE FOUND, THE CONTRACTOR SHALL PROMPTLY REQUEST FROM THE DESIGNER COMPLY WITH LOCAL ORDINANCES dw SPLASH BLOCK (E) POOL \ p m bei �1 i CLARIFICATION PRIOR TO COMMENCEMENT OF ASSOCIATED WORK.y.<xv,.a NOTES FOR REMODELING AND ADDITIONS: - MIN24"LONG z I TO OF CONCRETE, FACE OF I r SL P WAY FROM BLDG, TYP \ )) (E EPANEL i TO 9E UPGRADm o/ "Tt aj� I �� 5. DIMENSIONS MASONRY, FACE OF EXTERIOR STUDS; CENTERLINE OF STRUCTURAL COLUMNS A. Existing construction shown on drawings as well as (hese drawings are based upon' field s LLJ I I I I �W. 15.04 i - q.}'_3° v� 15-11° �i 14'-8° I-�i ANDBEAMS, OR CENTERLINE OF INTERIOR STUDS, UNLESS OTHERWISE NOTED. information obtained from existing drawings and/or measurements. OR _ I 1 < i `• r / I CLEAR DIMENSIONS ARE INDICATED FROM FINISHED SURFACES OF MATERIALS ASSEMBLIES. B. Contractor shag verify all existing field conditions prior fostarling construction. sOYOn�" E . W I I I I .� IST FLOORSETBACK 2D' �`' - v -' / ':-A.S -OI. :al.. 6. BUILDING ELEVATION REFERENCES. ARE FROM DIRECT APPLICATION OF FINISH C. If existing structural members are encountered during demolition which are not as to be be brought to the attention of the Contractor or Engineer Ya;« r r? - S,------------------ J ' • I` i : 1 f I FLOORING APPLIED TO THE STRUCTURAL FLOORSUOF THE GROUND removed, these' shall FLOOR DATUM(MAINENTRANCE). CONTRACTOR SHALL INCLUDE REQUIRED immediately priorto any further demolition. a w. II - --__-___-_� ----- _ SETBACK 25' I t ADD t- (E) I.:. DEPRESSIONS AND/OR PROJECTIONS IN ACHIEVING REQUIRED ELEVATIONS _. CEILING HEIGHTS ARE REFERENCED TO FINISHED SURFACES UNLESS OTHERWISE D. Remove and relocate (a) mechanical, electrical, plumbing and other items not indicated area. All areas to be patched and •� I 15i-„ SQf'c•,_ F� TO BE :RE�OVED GROUND.IMMEDIATELY NOTED. rOn epaired to match ex slingfoL construction of remodeled Ate: AMM / n :m m �... - ""r I ADJACENT'TO THE 7. KEYNOTES USED ON THE DRAWINGS ARE FOR ASSEMBLIES, MATERIAL, i " I la �L�. I ` ' ADDITION I.FOUNDATION SHALL BE ISLOPED.AWAY-FROM THE REFERENCES AND NOTES; REFER TO THE KEYNOTE LEGEND ON THE RESPECTIVE DRAWING FOR THE -INFORMATION WHICH RELATES TO EACH KEYNOTE NOT ALL ,. •� - - I I I I •,•:"... rr �� j o r �1 o o `� d.:; In j°D':- "... 2ND FLOOR 2-: 979.8 SQ FT o `� I '` I' D• L I BUILDING AT A SLOPE OF NOT LESS THAN 5% FOR. I A' MINIMUM DISTANCE: OF. - KEYNOTES REFERENCED MAY BE APPLICABLE -TO SIMILAR TYPE DRAWINGS:. 8. EXISTING WORK ISSHOWNFOR REFERENCE ONLY. THE OWNER AND,:.-- F ,y.^' - AREA INTRUDING 1 1 ° k _ m • Y.J �- F f : v "- 5'-8° I'10 FEET" CRC : R401.3. CONTRACTOR DO NOT GUARANTEE' EXISTING CONDITIONS INDICATED ON THESE T CORNER -TRIANGLE TO AT B`PT.HT r IN m Y, DOCUMENTS. 9 0 Ln REMAIN Iii. f3 1 I IU I` I CAME :.. w.' o li PROJECT INFORMATION VICINITY. MAP g ; t Q oza sa i U g L o ,..0 I DESIGNER: DSQUARESTUDIO ... - o 6 O 2193 SUMMERTON DR, SAN JOSE. CA `• .. - ":: ". "s I 1- 1 L2ND FL OORSETBACK 25. / 1 1^ I c (ass)s25an1, ._ ..•..": "-, :' ....",w:ctx .a �- .6 :. - z----- - --- I / .. (E): GARAG I� - I{= juand@d•squaiestudio.com FLOW _-6 --`--_--------- jig I -----374 SQ F1 ---- �O STRUCTURAL: AQX ENGINEERING _ ' ` LLI �.. ..: _ L i -�_ ivJ. - - (E}.WA - ---- UNE _.-'� - ---D.S:.IST FLO �1 ..-- -,.i: D.S..'. I� 6525 CROWN BLVD SAN JOSE, CA U _ vl Iw ♦. e° �cDp`P D. I r OPAE Iw ~ (408)229.3517„w`> chyou88@gmap.com U > I I M 23'-4' -L ` �._8e RCONICRErE EPLACED 20'_p / ;, I - I ZONING: R-1-10 -SINGLE FAMILY �` } ry Q I LANDSCAPE �� - ° TYPE OF CONST: V.B APN: 369.26416 : W I 1 cry BE (E); GRASS �� EP WI (E) GRASS (E) DRCONCR IVEWAY _ i - 3 V Lj ,- EXISTING CONDITIONS PROPOSED PROJECT... m $ CONCRETE TO, BE .. I LOT SLE: 6,657.1 SQ. FT. SAME FIRST FLOOR AREA 1,371.32 SO. FT. 1,465 SQ. FT. " -" L1 -I. _ - _ _ • �`\ - REPLACED :W�PAVERS -4,(N), I EE . I SECOND FLOOR NONE 960 SQ.FT. TOTAL: 1,371.32.SQ.FT.2,445 SOFT. 1 "" zrw LO CORNER TRIANGLE 40' � PROPERTY LINE 70 I GARAGE: 373.3 SQ.FT. . 477.6SQ.FT. .:. O TOTAL AREA .,. • ,. 2.. I ENTRY 110SQ.FT.'.. 47,50 SOFT. "" ,. .. FAR. - 26% 44% ::.. ... .:. .. :.: .. :. j DEMO 31 SQ.FT. OF GARAGE" NO. OfSTORIES 1 - 2" NO. OF BEDROOMS 3 a - REVISIONS: I TO BUILT NEW GARAGE NO. oFBATHROOMS 2 3 -. SHEET INDEX PLANNING COMM. JUN 26,2011 CONFORMING WITH REQUIRED, 1 SETBACK AND DIMENSIONS LO COVERAGE 2 area covered by all structures 1,854.62 1,990.1 ARCHITECTURAL LANNING:GOMM.APR 4,201E . I I BETTE AVE I : .'... �,� 3 - .overhangs 273.94 326.81. TOTAL 2,126.5616,657.1 2,316.9116,657.1 A-0.0 TITLE SHEET -.SITE PLAN - _ -. 32% 35% : A-0.1 CAL GREEN NOTES A•2.0 EXISTING I DEMO PLAN - SHEET. TITLE SHEET 42'-3' 18.3' 14.36' - _ A-2.1 , - FLOOR PLANS A-3.0 ELEVATIONS & SITE PLAN - ", - '- D - CODES -': A-3.1 ELEVATIONS ASA .SECTIONS A-5.0 ROOF PLAN •'. SCALE AS SHOWN - SITS PLAN Z - - EY BEST MANAGEMENTT-1.0 LAND VPRACTICES(CITY OF CUPERTINO) S�ALE: IVB' = F -o' APPLICABLE CODES: - - DATE 3.Lzov - 2016 CALIFORNIA BUILDING CODE (CBG) - -•-` 2016. CALIFORNIA RESIDENTIAL CODE (CRC) PROJECT DESCRIPTION - - - - 2016 CALIFORNIA REFERENCE STANDARDS CODE(CRSC) PRJ.No. 2ov-o5 2016 CALIFORNIA ELECTRICAL CODE(CEC) REMODELING OF MAIN FLOOR 1.372 SQ.FT. INCLUDING KITCHEN, LIVING ROOM, DINING, DRAWN BY: - - - 2016 CALIFORNIA MECHANICAL CODES (CMC) FAMILY ROOM, (N) LAUNDRY ROOM, (N) BATHROOM..ADDITION OF 128.67 (121.84.SQ.FT. TO (N) BEDROOM 4 AND 6.73 SO Fr. TO LIVING ROOM) www.d-squarestudio.com _ 2016 CALIFORNIA PLUMBING CODE (CPC) ADDITION OF NEW SECOND FLOOR 979.80 FOR (N) MASTER BEDROOM AND (N) MASTER 4OS'625-9171 BATHROOM, (N) 2 BEDROOMS AND (N) 2 BATHROOMS - - - - 2016 CALIFORNIA FIRE CODE (CFC) 2016 CALIFORNIA ENERGY CODE DEMO AREA OF GARAGE CURRENTLY OVER FRONT SETBACK (31 SO.FT.) ADDITION TO GARAGE AREA OF 102.7 SQ.FT. TO COMPLY WITH 20'X20' CLEAR PARKING AREA - 2016 CALIFORNIA GREEN BUILDING STANDARDS CODE - - - : - - - - 2016 CALIFORNIA EXISTING BUILDING CODE (CEBC) - PWIS ARE NOT FOR CONSTRUCTION UNLESS APPROVED AND STAMPED BY BUILDING DEPARTME 20% REDUCTION OF WATER USE ARE NOW PRESCRIPTIVELY BOTTOM PLATES. ANNULAR SPACES AROUND PIPES, ELECTRIC CABLES, CONDUITS, DESIGNATED WITHIN CALGREEN TEXT. PLUMBING FIXTURES AND FITTINGS SHALL COMPLY WITH THE OR OTHER OPENINGS IN SOLE/BOTTOM PLATES ATEXTERIOR FOLLOWING: WALLS SHALL BE CLOSED WITH CEMENT MORTAR, CONCRETE 4.303.1.1 WATERS CLOSETS: S 1.28 GAL/FLUSH MASONRY ORA SIMILAR METHOD. ACCEPTABLE TO THE 4.303.1.2 URINALS: :9 045.GAL/FLUSH ENFORCING AGENCY TO PREVENT PASSAGE OF RODENTS. 4.303.1.3.1 SINGLE SHOWERHEADS: :9 2,0 -GPM 0:80 PSI 4.303.1.3.2 MULTIPLE SHOWERHEADS: COMBINED FLOW, RATE 4.408.1 -CONSTRUCTION WASTE REDUCTION BY AT LEAST 50 OF ALL SHOWERHEADS AND/OR OTHER SHOWER OUTLETS CONTROLLED BY A SINGLE PERCENT - RECYCLE AND/OR SALVAGE FOR REUSE A MIN. OF 50% OF THE VALVE SHALL NOT EXCEED 2.0GPM ® 80 PSI OR ONLY. NON -HAZARDOUS CONSTRUCTION AND DEMOLITION DEBRIS ONE SHOWER OUTLET IS TO BE IN OPERATION AT A`T1ME RECYCLE AND/OR SALVAGE FOR REUSE A MINIMUM OF 50%, -OF 4.303.1.4.1 RESIDENTIAL LAVATORY FAUCETS: 5 1.5:GPM"® THE NON HAZARDOUS CONSTRUCTION AND DEMOLITION :WASTE IN 60 PSI ACCORDANCE WITH EITHER SECTION 4.408.2, 4.408.3 OR 4.303.1.42 LAVATORY FAUCETS IN COMMON AND PUBLIC 4.406.4; OR MEET A MORE STRINGENT LOCAL CONSTRUCTION - AND DEMOLITION WASTE MANAGEMENT ORDINANCE. USE AREAS OF RESIDENTIAL BUILDINGS: < 0.5 GPM 0 60 DOCUMENTATION IS REQUIRED PER SECTION 4.40B.5. PSI 4.303.1.4.3 METERING FAUCETS: S 0.25 GALLONS PER EXCEPTIONS: % 1 - EXCAVATED SOIL AND LAND -CLEARING DEBRIS.. CYCLE 4.303.1.4.4 KITCHEN FAUCEiS: 5 1.8 GPM § 60 PSI; 2 - ALTERNATE WASTE REDUCTION METHODS DEVELOPED BY TEMPORARY INCREASE TO 22 GPM ALLOWED BUT SHALL WORKING WITH LOCAL ENFORCING AGENCIES IF DIVERSION OR DEFAULT TO 1.8 GPM RECYCLE FACILITIES CAPABLE OF COMPLIANCE WITH THIS ITEM 4 505 3 -MOISTURE CONTENT OF BUILDING MATERIA!S MATERIALS WITH VISIBIE SIGNS OF WATER DAMAGE SHALL NOT BE DO NOT,EXIST'OR ARE NOT LOCATED REASONABLY CLOSE TO 4.303.2 STANDARDS RES- AND FITTINGS: THE JOBSITE. SPECIFIES THAT PLUMBING: FIXTURES AND FITTINGS, SHALL BE 3 - THE ENFORCING AGENCY MAY MAKE EXCEPTIONS TO THE INSTALLED IN ACCORDANCE WITH THE''CALIFDRNIAPLUMBING REQUIREMENTS OF THIS SECTION WHEN ISOLATED JOBSiiES ARE `HAUL CODE LOCATED IN AREAS BEYOND THE BOUNDARIES OF THE RELOCATES PROVISIONS FOR MULTIPLE SHOWERHEADS TO SECTION DIVERSION FACILITY. 4.303.1.3.2. 4,408 2 -CONSTRUCTION WASTE MANAGEMEE T PLAN - FINAL INSPECTION SHALL COMPLY WITH: 1) CONTROLLER SHALL BE 'WEATHER _ORSOIL MOISTURE -BASED THAT AUTOMATICALLY RESPOND TO THE-PLANTS.N'NEEDS AS WEATHER CONDITION CHANGE 2) WEATHER -BASED WITHOUT INTEGRAL RAIN SENSORS OR COMMUNICATION SYSTEMS THAT ACCOUNT FOR LOCAL -RAINFALL SHALL HAVE SEPARATE WIRED OR WIRELESS RAIN SENSORS THAT CONNECT OR COMMUNICATE WITH THE CONTROLLERS. SOIL mmm IRF-RACFn. c MMI I FRS ARF -NOT REQUIRED TO HAVE RAIN SENSOR INPUT. INSTALL SEALED COMBUSTION FURNACE INSTALL 'HIGH ,EFFICIENCY AIR CONDITIONING WITH ENVIRONMENTALLY PREFERABLE REFRIGERANTS USE DUCT MASTIC ON -ALL DUCT JOINTS. AND SEAMS CAL GREEN 4.303.1 AS AN ALTERNATE TO PRESCRIPTIVE COMPLIANCE, A 207` REDUCTION IN BASELINE WATER USE SHALL BE DEMONSTRATED THROUGH CALCULATIONS CAL GREEN 4.406.1 JOINTS AND OPENINGS. ANNULAR SPACES. AROUND -PIPES, ELECTRIC CABLES, CONDUITS OR OTHER OPENINGS IN PLATES AT EXTERIOR WALLS SHALL BE PROTECTED CAL GREEN 4.503.1 GAS FIREPLACE SHALL BE A DIRECT -VENT SEALED -COMBUSTION` TYPE. WOOD STOVE OR PELLET STOVE SHALL COMPLY W/' US EPA PHASE it EMISSION LIMITS CAL GREEN 4.505.2 VAPOR RETARDER AND CAPILLARY BREAK IS INSTALLED AT SLAB ON GRADE FOUNDATIONS CAL GREEN 4.505.3 19% MOISTURE CONTENT OF BUILDING FRAMING MATERIALS CAL GREEN 702.1 HVAC SYSTEM INSTALLERS -ARE TRAINED AND CERTIFIED IN THE PROPER INSTALLATION OF HVAC SYSTEMS DUCT OPENINGS AND OTHER RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED DURING CONSTRUCTION. TIGHTLY SEAL THE AIR BARRIER BETWEEN GARAGE AND LIVING AREA (PERFORMANCE TEST REQUIRED). INSULATE ALL HOT WATER PIPES. " USE TRADITIONAL TRUNK,: BRANCH; & 'TWIG PLUMBING WITH DEMAND CONTROLLED CIRCULATION LOOPS. USE LOW-VOC OR ZERO..-VOC PAINT (< 50 GPL VOCs REGARDLESS OF SHEEN) USE LOW-VOC COATINGS: THAT MEET SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT:RULE 1113. www.aqmd.gov/ruies/reg/regl 1/0113.pdf USE LOW-VOC CAULKS,`.CONSTRUCTION ADHESIVES AND: SEALANTS THAT MEEK SOUTH COAST AIR .QUALITY MANAGEMENT DISTRICT RULE 1168. wwW.agmd.gov/rules/reg/regl1/r116B.pdf REDUCE FORMALDEHYDE, IN IN FINISHES. MEET CURRENT CA AIR RESOURCES BOARD (CARB),AIRBORNE TOXIC CONTROL MEASURE (ATCM) FOR COMPOSITE WOOD FORMALDEHYDE LIMiTS:BY MANDATORY COMPLIANCE DATES. CGBC TABLE 4.504.5. ALL CARPET AND 50% OF RESILIENT FLOORING SHALL BE' LOW EMITTING. INSTALL ENERGY STAR DISHWASHER, CLOTHES WASHER THAT-MEEiS CEE TIER 2 REQUIREMENTS (MODIFIED ENERGY FACTOR 2.0, WATER FACTOR 6.0 OR LESS), AND ENERGY STAR QUALIFIED REFRIGERATOR LESS. THAN', 25 CUBIC FEET CAPACITY. A CONSTRUCTION WASTE MANAGEMENT PLAN SHALLBE SUBMITTED FOR APPROVAL SEE' CAL ;GREEN 4.408 FOR REQUIREMENTS 4.408.2,1 -DOCUMENTATION DOCUMENTATION OF COMPLIANCE WITH THE CONSTRUCTION WASTE MANAGEMENT PLAN SHALL BE PROVIDED TO THE CITY DEMONSTRATING COMPLIANCE. THE PLAN SHALL BE UPDATED AS NECESSARY AND ACCESSIBLE DURING CONSTRUCTION. SEE CITY FOR FORMS 4408'3 -WASTE MANAGEMENT COMPANY UTILIZE A WASTE MANAGEMENT COMPANY. APPROVED BY THE ENFORCING AGENCY, WHICH CAN PROVIDE VERIFIABLE DOCUMENTATION THAT DIVERTED CONSTRUCTION AND DEMOLITION WASTE MATERIALS- MEET THE REQUIREMENTS iN SECTION 4.408.1. 4410 -BUILDING MAINTENANCE AND OPERATION AN OPERATION AND MAINTENANCE MANUAL ACCEPTABLE TO THE CITY SHALL BE AVAILABLE AT FINAL INSPECTION AND SHALL BE PLACED IN THE BUILDING. SEE CALL GREEN 4.410 FOR MANUAL REQUIREMENTS SION 45 ENVIRONMENTAL QUALITY 303:1 -FIREPLACES-- 4505 -INTERIOR MOISTURE CONTROL 4505.2 -CONCRETE SLAB CONTRQLUALI 5 CONCRETE SLAB FOUNDATIONS SHALL HAVE A VAPOR RETARDER PER THE CBC 4506=INDOOR AIR QUALITY AND EXHAUST 3,5061' BATHR04M EXHAUSTFANS MECHANICAL BATHROOM EXHAUST FANS SHALL COMPLY WITH THE ANY GAS FIREPLACE SHALL BE A DIRECT -VENT; SEALED -COMBUSTION TYPE.. ANY WOOD FIREPLACE OR=PELLET'STOVE SHAH COMPLY WITH THE US EPA PHASE II AND PROVIDE A,CAPILLARY.BREAK BY ONE OF THE FOLLOWING: 1) A 4 INCH THICK BASE OF 1/2 INCH LARGER CLEAN `AGGREGATE WITH -A FOLLOWING: 1) FANS SHALL BE ENERGY STAR COMPLIANT AND DUCTED TO EMISSION LIMITS .OR VAPCR BARRIER IN DIRECT CONTACT WITH THE CONCRETE AND A CONCRETE MIX TERMINATE OUTSIDE THE BUILDILNG 2) UNLESS FUNCTIONING ASA COMPONENT OF A WHOLE HOUSE Ir I L EQUIPMENT. 4 5041 COVERING OF DUCT OPENINGS AND PROTECTION OF MECHAN CA WILL ADDRESS BLEEDING;; SHRINKAGE AND CURLING DESIGN THAT .. 2 OTHER EQUIVALENT METHODS APP ROVED BY THE CfIY ��� TION SYSTEM FANS SHALL BE CONTROLLED BY A HUMIDISTAT THAT IS READILY ACCESSBILE DURING CONSTRUCTION ' CONSTRUCTION S DURING ROUGH INSTALLATION AND. DURING: STORAGE ON THE CONSTR ITE, UNTIL FINAL STARTUP` OF THE. HEATING AND COOLING EQUIPMENT, ALL DUCTS' AND 3 A SLAB':DESIGN-SPECIFIED BY A .LICENSED, ..DESIGN .PROFESSIONAL HUMIDISTAT CONTROLS SHALL BE CAPABLE OF ADJUSTING THE OTHER RELATED AIR DISiRIBUTIDN COMPONENT OPENINGS SHALLBE COVERED' WITH 4'a-CAPILAR BREAK A CAPILLARY BREAK SHALL BE INSTALLED IN COMPLIANCE WITH A T .LEAST. ONE RELATIVE HUMIDITY BETWEEN 50% AND 80% TAPE, PLASTIC, SHEET METAL OR OTHER METHOD ACCEPTABLE'TO THE CiTY _ OF THE FOLLOWING: 4 5 EM"RONM QUALITY (ENVIRONMENTAL COMFORTi AND CAULKS -INCH' ` 101.6 MM THICK BASE OF 1 2 -INCH ; (12.7 MM)- OR LARGER 1 -,A 4 ( ) / ps"BION 35072 HEATING AND AIR rnnlnmorllNG SYSTEM DESIGN IR C 450421 -ADHESIVES SEALANT ALL ADHESIVES, ,ADHESIVE BONDING PRIMERS; ADHESIVE PRIMERS SEALANTS SEALANT PRIMERS AND CAULKS SHALL COMPLY WITH THE VOC LIMITS `SHOWN IN TABLE 4.504.1 CLEAN AGGREGATE SHALL BE PROVIDED WITHA VAPOR RETARDER IN DIRECT CONTACT WITH CONCRETE AND A CONCRETE MIX DESIGN WHICH WILL ADDRESS HEATING AND AIR CONDITIONING SYSTEMS SHALL BE SIZED, DESIGNED, AND EQUIPMENT SELECTED USING THE FOLLOWING AND .4.504.2 OR LIMITS ESTABLISHED BY THE BAY AREA AIR QUALITY DISTRICT, IS RESTRICTIVE. SEE CAL GREEN 4.504 FOR TABLES, SHALL IT USED. FDR ADDITIONAL INFORMATION, SEE AMERICAN CONCRETE INSTITUTE, ACI 302:2R -O6. INFORMATION, SEEA M RICAN CONCRETE, METHODS: 1 - THE HEAT LOSS AND HEAT GAIN IS ESTABLISHED ACCORDING WHICHEVER -MORE AEROSOL ADHESIVES; SMALLER UNIT SIZES OF ADHESIVES AND SEALANT OR CAULKING 2 --OTHER EQUIVALENT METHODS APPROVED BY THEENF.ORCING AGENCY. 3 - A SLAB DESIGN. BY A LICENSED DESIGN PROFESSIONAL TO ANSI/ACCA 2 MANUAL J - 2004 (RESIDENTIAL LOAD CALCULATiON),_ASHRAE HANDBOOKS OR OTHER EQUIVALENT DESIGN COMPOUNDS THAT DOf NOT WEIGH MORE THAN 1 POUND OR CONSIST OF MORE. THAN 16 FLUIDOUNCES SHALL COMPLY WITH STATEWIDE VOC STANDARDS AND OTHER 4 505 3 -MOISTURE CONTENT OF BUILDING MATERIA!S MATERIALS WITH VISIBIE SIGNS OF WATER DAMAGE SHALL NOT BE SOFTWARE OR METHODS. 2 --DUCT SYSTEMS ARE SIZED ACCORDING TO ANSI/ACCA-1 REQUIREMENTS ' BUILDING INSTALLED MANUAL'D - 2009 (RESIDENTIAL DUCT SYSTEMS), ASHRAE HANDBOOKS OR OTHER EQUIVALENT DESIGN SOFTWARE OR 4.504,22 -PAINTS AND COATINGS _METHODS. PAINTS AND COATINGS SHALL COMPLY WITH THE VOC LIMITS SHOWN WALL AND FLOOR FRAMING SHALL NOT BE ENCLOSED WHEN THE FRAMING BE 3 _SELECT HEATING AND COOLING EQUIPMENT ACCORDING TO ARCHITECTURAL IN TABLE"4.504.3 MEMBERS EXCEED 19% MOISTURE CONTENT. MOISTURE CONTENT SHALL ANSI/ACCA 3 MANUALS - 2004 (RESIDENTIAL` EQUIPMENT VERIFIED BY.THE FOLLOWING: 1) MOISTURE CONTENT SHALL BE DETERMINED' WITH EITHER, APROBE-TYPE OR SELECTION) OR OTHER EQUIVALENT DESIGN SOFTWARE OR 4.504.2.3 -AEROSOL -PAINTS. AND COATINGS ROSOL PAINTS AND COATINGS -SHALL COMPLY WITH`THE'VOC LIMITS SHOWN IN CONTACT -TYPE MOISTURE METER 2 MOISTURE READINGS SHALL BE TAKEN BETWEEN 2 AND 4 FEET FROM. THE ) METHODS. TABLE.,1-OF THE :BAY AREA AIR MANAGEMENT DISTRICT REGULATION B, RULE 9 ' ` GRADE STAMPED END OF EACH PIECE VERIFIED 3) AT LEAST 3 RANDOM MOISTURE READINGS SHALL BE PERFORMED ON WALL EXCEPTION: USE OF ALTERNATE DESIGN TEMPERATURES NECESSARY TO ENSURE THE SYSTEM FUNCTIONS ARE ACCEPTABLE. AND FLOOR FRAMING WITH DOCUMENTATION 'ACCEPTABLE TO THE crIY PROVIDED 4.504.2:4 -VERIFICATION VERIFICATION OF COMPLIANCE,WITH THE VOC LIMITS' SHALL BE =PROVIDED TO THE CiTY AT THE TIME OF APPROVAL TO ENCLOSE THE WALL AND FLOOR FRAMING 702.1 -INSTALLER TRAINING THAT. MAY: INCLUDE BUT IS :NOT LIMITED TO MANUFACTURERS _PRODUCT SPECIFICATIONS OR ON-SITE PRODUCT CONTAINERS INSULATION PRODUCTS THAT ARE VISIBLY WET OR HAVE HIGH MOISTURE CONTENT SHALL BE REPLACED OR ALLOWED TO DRY PRIOR TO ENCLOSURE OF HVAC INSTALLERS SHALL BE TRAINED AND CERTIFIED IN THE PROPER INSTALLATION` OF HVAC SYSTEMS INCLUDING DUCTS AND EQUIPMENT BY A 4,504.3 = CARPET SYSTEMS THE WALL OR FLOORCAVfDES. WET -APPLIED INSULATION PRODUCTS SHALL FOLLOW THE MANUFACTURE'S DRYING RECOMMENDATIONS PRIOR TO -ENCLOSURE NATIONALLY OR REGIONALLY RECOGNIZED TRAINING OR CERTIFICATION PROGRAM OR BE UNDER THE DIRECT SUPERVISION AND RESPONSIBILITY OF ALL CARPET INSTALLED IN THE' BUILDING INTERIOR SHALL MEET THE TESTING AND PRODUCT ;REQUIREMENTS OF ONE OF THE FOLLOWING: A PERSON TRAINED AND -'CERTIFIED 1 - CARPET AND RUG INSTITUTE'S GREEN LABEL PLUS PROGRAM 2 --CALIFORNIA DEPARTMENT OF PUBLIC HEALTH, "STANDARD, METHOD FOR THE 702.2 -SPECIAL INSPECTION WHEN REQUIRED BY THE CITY THE OWNER OR THE RESPONSIBLE ENTITY TESTING AND EVALUATION OF VOLATILE` ORGANIC CHEMICAL EMISSIONS FROM INDOOR ACTING 'ASiTHE OWNER'S AGENT SHALL EMPLOY ONE OR MORE SPECIAL SOURCES USING ENVIRONMENTAL CHAMBERS," VERSION 1.1, FEBRUARY 2010 (ALSO INSPECTORS TO PROVIDE INSPECTION OR OTHER DUTIES NECESSARY TO KNOWN AS SPECIFICATION 01350.) SUBSTANTIATE COMPLIANCE WITH THE CODE 3 - NSF/ANSI 140 AT THE GOLD LEVEL 4 - SCIENTIFIC CERTIFICATIONS SYSTEMS INDOOR ADVANTAGE GOLD 702 3 -DOCUMENTATION 4, 04.3 - CARPET` CUSHION ALL'CARPET CUSHION INSTALLED IN THE BUILDING INTERIOR SHALL MEET THE REQUIREMENTS OF THE CARPET AND RUG INSTITUTE'S GREEN LABEL PROGRAM. 4 504 3 CARPET ADHESIVE ALL CARPET ADHESIVES SHALL MEET THE REQUIREMENTS OF TABLE 4.504.1 4,504,15 - COMPOS rrE WOOD `PRODUCTS HARDWOOD PLYWOOD, PARTICLEBOARD .AND MEDIUM DENSITY FIBERBOARD COMPOSITE WOOD PRODUCTS USED ON THE INTERIOR OR EXTERIOR OF THE BUILDING SHALL MEEr THE REQUIREMENTS FOR FORMALDEHYDE AS SPECIFIED IN THE AIR RESOURCES BOARD'S AIR TOXICS CONTROL MEASURE FOR COMPOSITE WOOD (17 CCR 93120 ET. SEQ.), ON OR. -BEFORE THE DATES SPECIFIED IN THOSE SECTIONS AS. SHOWN IN TABLE 4.504.5. DOCUMENTATION IS REQUIRED PER SECTION' 4.504.5.1. Table 4.504.5. FORMALDEHYDE LIMITS Maximum Formaldehyde Emissions in Parts per Million PRODUCT` CURRENT LIMIT HARDWOOD PLYWOOD VENEER CORE 0.05 HARDWOOD PLYW ODD COMPOSITE CORE 0.05 PARTICLEBOARD 0.09 MEDIUM DENSITY: FIBERBOARD 0.11 THIN MEDIUM DENSITY FIBERBOARD 0.13 DOCUMENTATION TO SHOW COMPUANCE WITH THIS CODE SHALL INCLUDE BUT IS NOT LIMITED TO; CONSTRUCTION DOCUMENTS, PLANS, SPECIFICATIONS, BUILDER OR INSTALLER CERTIFICATION, INSPECTION REPORTS, SPECIAL INSPECTION OR OTHER METHODS ACCEPTABLE TO THE CITY THIS LIST IS NOT MEANT TO BE COMPREHENSIVE, FOR ALL CHANGES OR CODE REQUIREMENTS. IT IS THE RESPONSIBILITY OF ALL _`PARTIES TO' DESIGN, PLAN, INSTALL AND CONFORM TO ALLOF THE REQUIREMENTS IN COMPLIANCE WITH THE CALIFORNIA GREEN BUILDING STANDARDS CODE, OTHER CALIFORNIA CODES AND CITY ORDINANCES AS"APPLICABLE DEFINITION OF COMPOSITE WOOD PRODUCTS: COMPOSITE WOOD PRODUCTS INCLUDE HARDWOOD PLYWOOD, PARTICLEBOARD; AND MEDIUM DENSITY FIBERBOARD. °COMPOSITE WOOD PRODUCTS' DO NOT INCLUDE HARDBOARD, STRUCTURAL PLYWOOD, STRUCTURAL PANELS, STRUCTURAL COMPOSITE LUMBER, ORIENTED STRAND BOARD, GLUED LAMINATED TIMBER, PREFABRICATED WOOD I -JOISTS, OR FINGER -JOINTED LUMBER, ALL AS SPECIFIED IN. CCR, TITLE 17, SECTION 93120.1(A). .. p ' O E��;a:ac: Lf) L•:�. CA Q 3gs;� V ,.: 0 - WIZ SHEET CAL GREEN NOTES SCALE NTS DATE 3.1..2017 PRJ • No. 2017-05 DRAWN BY; www.d-squarestud io•com 408-625-9171 -0.10 PLANS ARE NOT FOR CONSTRUMON UNLESS APPROVED AND SMIPED BY BUILDING DEPARTMF (NI WEST ELEVATION SCALE: I/�-I" =T-0" KEY NOTES O STUCCO, PAINTED SHERWIN WILLIAMS SW 6142 MACADAMIA O2 CLASS A;THREE PIECE LAMINATED FIBER GLASS LANDMARK TL ROOFING SHAKES l�3 BRONZE ANONDIZED ALUMINUM WINDOWS BY MILGARD EXTERIOR TRIM PAINTED KELLY MOORE 417 OXFORD BROWN A 'Lz &" O 0 H O ® O f --I F'- :3 rl � Op U �L N Q I3 l0 5 �- y � O c f� uj U- d O In VA P.H.+230AT APIANNING COMM. ]UN F.G. 220.55' SHEET ELEVATIONS SCALE A" = r-0" DATE 3.1.2017 PRJAO. 2017-05 DRAWN BY: www.d-squarestud io.com 408-625-9171 A-3mu PLANS ARE NOT FOR CONSTRUCTION UNLESS APPROVED AND STAMPED BY BUILDING DEPARTMENT. (N) EAST E=LE=VTlC3'N SCALE: I/W" = I'—O" T.O.R.+244_35' 2 12 ...... ................... ..... I.........- _............. � 4 ..................... ............._.......------..........._....... .-................._......._..........._......-----------..__........_._ ..... ................... - ... P.H +24023' j KE=Y MOTES O STUCCO, PAINTED SHERWIN WILLIAMJGLASS MACADAMIA O CLASS A,THREE PIECE LAMINATED FIBLANDMARK TL ROOFING SHAKES BRONZE ANONDIZED ALUMINUM WINDEXTERIOR TRIM PAINTED KELLY MOO BROWN «iYy ® p H U ri F- ur) N . Lu Ln ro N �cb :D to O ICY �. u .aS"aR, Lo CD : U cRo, LK� LI Lu W ui 2 R :2 0'^ .c; 3 0 REVISIONS: PLANNING COMM. JUN 26,2017 SHEET ELEVATIONS SCALE A" = 1'-0" DATE 3.1.2017 PRJ.NO. 2017-05 DRAWN BY: www.d-squarestudio.com 408-625-9171 A-3,1 ARE NOT FOR CONSTRUCTION UNL NED AND STAMPED BY BUILDING DI r €_ i vwwolmwlwm SECTION B 5r-ALe, -I/L4- F -0- z 0 uj u Zet 0 Lo cy) V) 0 Lu z LIJ Lu 0- :D LLJ LIJ u L- W co 0 L0 Lo C REVISIONS: SHEET SECTIONS SCALE Y4,, = i,-o,l DATE 3.1.2017 PRIMO. 2017-05 DRAWN BY: www.d-squarestudio-com 408-625-9171 PLANS ARE NOT FOR CONSTRUCTION UNLESS APPROVED M, U APPROVED AND STAMPED BY BUILDING DEI.ILRI.E Signa N "'21E SUBJECT COMMUNITY DEVELOPMENT DEPARTMENT PLANNING DIVISION CITY HALL 10300 TORRE AVENUE - CUPERTINO, CA 95014-3255 TELEPHONE: (408) 777-3308 ® FAX: (408) 777-3333 CUPERTINO.ORG ADMINISTRATIVE HEARING STAFF REPORT .Agenda Date: August 9, 2018 Architectural and Site Approval to consider a proposed 85,247 square foot office building including revisions to the parking structure., from above grade to below grade, for a previously approved office, research and development campus (Apple Park Phase 2- Tantau 14). (Applications: ASA -2018-08, EA -2018-05 Applicant: Bernard Baker, Apple Inc.; Project Location: 10500 N. Tantau Avenue; A.P.N.: 316-06-063) RECOMMENDED ACTION That the Hearing Officer adopt the Draft Resolution (Attachment 1) to: 1. -- Adopt the Eighth Addendum to the Ficial EIR (EA -2018-05)i and 2. Approve the Architectural and Site Approval Permit (ASA -2018-08.) DISCUSSION Project Data: MORN 're itt .'.: 3�. a 4c�se NYu9 General Plan Designation . ARMY MUNT, ,1 � imatiE,!%N 5' 3 / �' NEW Industrial/Residential II �l.i�.�b 3 No change Zoning Designation P(MP) No change Site Area (acres) No change Total approved development area Phase 2 642,000 No change (proposal consistent) Office 480,000 69,386 sq.ft. Amenity 162,000 15,861 sq.ft.,- Employees 500 No change Parking 600 spaces No change Structure 200,000 sq.ft. (2 stories) 0 Below -grade 51,000 sq.ft. (1 level) 193,000 sq.ft (3 levels) Surface 0 151 Bicycle lurking (min. 5% of 600 600 project wide automobile parking requirement) Setbacks Front Setback (min.) ® 15' Consistent © 1:1 slope line on N. Tantau Street Side Setback (min.) ® 15' Consistent Rear setback (min'.) 0 25' Consistent ® Adjacent to residential zones -100' Building Height (max.) Up to 35' beyond 150 im 31' to roof level of feet from east property building (consistent) line 39' to top of mechanical ® Up to 16' within 150 screen (screens allowed feet from east property to exceed building line height by General Plan) Consistency with General. Yes Yes Plan Consistency with Zoning I Yes I Yes Environmental Assessment Apple Campus 2 Final EIR Addendum to Final EIR (certified Oct. 15, 2013) prepared (Attachment 2) Background: The applicant, Apple Inc., received approval from the City Council in November 2013 to demolish existing office, research and development buildings and replace them with a new office, research and development campus to. be developed in two phases. The project, referred to as Apple Campus 2, is located in the North Vallco Area and encompasses approximately 176 acres. Apple is now applying for an architectural review and approval for an 85,247 office building and associated revised parking structure, which is referenced as Tantau 14, Site B of Phase 2 of the project. The parcel is located at the southeast corner of the intersection of North Tantau Avenue and Pruneridge Avenue. The surrounding land uses include: ® To the north, Apple Park Visitor's Center ® To the west and south: office, research and development facilities To the east: single family residential uses in the City of Santa Clara Analysis: Site Plan and Parking: The proposed project is within the approved development permit allocation and an improvement over the conceptual plans for the site presented to the City Council in October. 2013. The main improvements include: ® Reduction of the office area from 87,000 sq. ft. to 69,286 sq. ft. ® Elimination of an above ground two-story parking structure, abutting existing single family residential uses in the City of Santa Clara, by providing a three level below -ground parking structure. ® A green roof at the first story roof that projects beyond the second story footprint, contributing to overall run-off reduction and sustainability. The proposed building location and site access remains the same. The entrance to the proposed below -grade parking structure is oriented primarily toward the entrance on North Tantau Avenue. The project will also include an enclosure for trash facilities and other utilities near the entrance to the parking structure. Sitework and Grading: Grading and off -haul do increase on the project site to accommodate the larger below grade parking garage. See discussion in the environmental review section below. Architecture and landscape: The design is compatible with the main Apple Campus 2 concept and the neighboring buildings on Tantau, featuring clean lines/contemporary architecture, glass fagade with curved corners, and concrete eaves. As part of the campus -wide tree planting strategy, the proposal includes the planting of a significant number of trees (250 trees).The The existing wall along the east property line adjacent to Santa Clara would be maintained as required by the conditions of approval of the Master Development Permit for the campus. The number of trees proposed to be removed are within the number of trees allowed to be removed on the entire campus per the Master Tree Removal permit. Development Allocation: The proposed building is within the development permit envelope approved previously by the City Council in 2013. The amenity space.: is consistent with the existing allocation for phase 2. In this case, the office space has been reduced. A condition of approval continues to restrict the conversion of any amenity spaces to non -amenity spaces without appropriate permits. Environmental Review: Since the excavation needed to construct the proposed larger underground parking area and off -haul of the additional material would increase from the approved amount of excavation, an Addendum to the Final EIR certified in October 2013 has been prepared to ensure that the amendments to the project do not cause the occurrence of the conditions described in Section 15162 of the California Environmental Quality Act and the preparation of a subsequent EIR (See Attachment 2.) There are 20,000 cubic yards (CY) of excavation of material available of the originally approved amount. The proposed below - grade parking structure will increase the required excavation and off -haul amounts by 68,000 CY to a total of 88,000 CY. The environmental effects of this change in the amount of excavation and associated construction and truck trips were evaluated by LSA Associates, Inc. in their air quality peer review memo dated July 20, 2018. The memo indicated that no impacts would be associated with the proposed changes identified in the design applications for the ancillary buildings. The Addendum finds that the revisions that the applicant is seeking would not require major revisions to the Final EIR certified on October 15, 2013, due to new or substantially increased significant environmental effects and that the certified Final EIR adequately identifies all environmental effects and adequate mitigation measures for the proposed modifications to the previously approved project. Therefore, no subsequent or supplemental EIR is required prior to approval of the Architectural and Site Approval of the proposed project described above. PUBLIC NOTICING AND COMMUNITY OUTREACH The following table is a brief summary of the noticing done for this project: 'f SiA. �ak.ssn �p:�N 1 _K .5 'e. '. as: �MiS �xi sre s n3� i is gw56 w 7' . •'..- � .c��u b r. i d e [ l .�s k,,'+n,�, ',.r���'' t8�w':psr.;i[r 6•-�.l� iF Fe ��,fi '._ j! b�°LL�i. 3xV���S.%��Jl`A[: zs�s �3 i3I� F k d Ps �, _2 ..+n Rcass• 0,10 ?iN ?_, fig.. , `3tt , Z-110 Ere a �U ). •R". � nA .eM§11 ate.. 's�sP � `, v��� "0 W�'m"'gmm .r� � 1. 'sr 'w (rY ' 6�,iI z �fi :.k• y� "ka�ycv/F.w, ,FRi�n ' ^ Y' f f.a' u.:. � '' s sS E" rS l a'a' i a� r3` `gym'. d� . fiPa•Y3'Br� � e' � 3 Zg .Y, 3. � A u �t'k'�T �si d� .�A,.,..�dc.#n,".a .r1d •,it �w,lsaw.:zt `.".f�itius' .Y: •5•s rho.. ® Site Signage (10 days prior to hearing) ® Posted on the City's official notice @ Notices mailed to property owners bulletin board (one week prior to hearing) adjacent to the project site (10 days ® Posted on the City of Cupertino- s Web prior to hearing) site (one week prior to hearing) Public comments were received from one Santa Clara neighbor, Milt Kostner, who is supportive of the parking structure revision but has concerns, including the tree species being planted, the preservation of the 8 -foot wall between properties, and shielding of light sources (See Attachment 4.) Standard conditions of approval would adequately address these concerns. PERMIT STREAMLINING ACT This matter is adjudicatory and is subject to the Permit Streamlining Act (Government Code Section 65920 — 65964). The City has complied with the deadlines found in the Permit Streamlining Act. The project was deemed complete on July 20, 2018. The City has 60 days (until September 18, 2018) to make a decision on the project. CONCLUSION Staff recommends approval of the Architectural and Site Approval Permit because the project is consistent with the General Plan, applicable zoning ordinances and the Master Development Permit approved in 2013. Additionally, all of the findings for ;approval of the proposed project, consistent with Chapter 19.168 of the Cupertino Municipal Code, may be made as reflected in the Draft Resolutions. NEXT STEPS The permit will be effective 14 calendar days from the date of the hearing. The decision of the Administrative Hearing Officer is final, unless appealed within 14 calendar days from the date of the hearing. The applicant may apply for building and/or other permits with the City at the end of the appeal period. Prepared by Catarina Kidd, Senior Planner Reviewed and Approved by_: Piu Ghosh, Principal Planner ATTACHMENTS 1. Draft Resolution 2. 8�h EIR addendum and technical memos 3. PlanSet 4. Public comments CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 94 OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL APPLICTION FOR APPLE PARK PHASE 2, SITE B. TANTAU 14 LOCATED AT 10500 N. TANTAU AVENUE SECTION I: PROTECT DESCRIPTION Application No.: ASA -2018-08 (EA -2018-05) Applicant: Bernard Baker, Apple Inc. Location: 10500 N. Tantau Avenue APN: 316-06-063 SECTION II: FINDINGS WHEREAS, based on substantial evidence in the administrative record, on October 15, 2013, the City Council held a public hearing to consider the approval of an office, research and development campus; and WHEREAS, after consideration of evidence contained in the entire administrative record, at the public hearing on October 15, 2013, the City Council adopted Resolution No. 13-082 certifying the Final EIR, adopting Findings and a Statement of Overriding Considerations, adopting Mitigation Measures, and adopting of a Mitigation Monitoring and Reporting Program for the Apple Campus 2 development; and WHEREAS, the City Council approved an office, research and development campus for Apple Inc. including entitlements for a phased development of the campus which included the development of properties along North Tantau Avenue in separate phases; and WHEREAS, an application was received by the City for an Architectural and Site Approval permit to consider allowing a proposed '85,247 square feet office building and a revision to the associated parking structure from above grade to below grade for Phase 2 of a previously approved office, research and development campus as described in Section I above; and WHEREAS, environmental analysis and peer reviews were conducted by LSA Associates, Inc. pursuant to the requirements of CEQA, finding that no new or substantially increased significant environmental effects; and Resolution No. 94 ASA -2018-08 (EA -2018-05) August 9, 2018 Page 2 WHEREAS, the Administrative Hearing Officer has reviewed the information in the Eighth Addendum to the Final EIR, which concludes that no further environmental review is required for the proposed amendments to the development; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one'public meeting in regard to the application; WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds: 1. The proposal, at the proposed location, will not be detrimental or injurious to property or _improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The proposal will not be injurious or detrimental to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience because the project will incorporate programs and practices that are intended to increase sustainability and safety for the entire Apple Park corporate campus, employees and surrounding environment. The programs and practices that will be incorporated at this site include the planting of 250 trees (increasing tree count over five times the number of existing trees), corporate shuttle stop to reduce single occupancy vehicle trips, green roof to reduce run-off and provide additional natural habitat area, a bicycle share program, and on-site amenity areas that would reduce traffic congestion on city roads. 2. The proposal is consistent with the purposes of Chapter 19.168, Architectural and Site Review, of the Cupertino Municipal Code, the General Plan, any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: The project is in compliance with the General Plan and the Zoning regulations governing the project site. The architecture of the proposed project particularly furthers General Plan Policy 2-14: Attractive Building and Site Design "by careful attention to building scale, mass and placement, architecture, materials, landscaping, screening of equipment and loading areas and related design considerations."'The project design incorporates several of the strategies included in this General Plan Policy including articulation and segmentation of wall and roof planes through curved corners and concrete overhangs, visual openings in the wall plane with use of glass facades, appropriate setbacks and landscaping. The parking Resolution No. 94 ASA -2018-08 (EA -2018-05) August 9, 2018 Page 3 for the project has been revised from above grade to below grade to reduce visual impacts to neighbors to the east. a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings; b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new buildings should harmonize with adjacent development by being consistent or compatible with design and color schemes, and, with the future character of the neighborhoodand purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments, and provide' shielding to prevent spill-over light to adjoining property owners; The buildings will be visible from the public right-of-way but minimally from the neighboring properties due to a masonry wall and proposed trees along, the property line. The property values in the adjacent area will be maintained or enhanced due to proximity to this new employment center. The walls, fencing, hedges and screen planting have been designed to minimize the impacts upon adjacent properties and to be located beyond the 100 feet setback. Mechanical equipment will be shielded from view, located sufficiently away from the property line and screened so as to not be visible. Permeable surface area has been increased due to the green roof proposal. The removal of healthy trees has occurred where there are direct conflicts with improvements, but will be replaced by more than three times the number of trees that are removed. The lighting for the development has been designed so as to not spill over onto adjacent properties. The proposed revision of the parking structure from above grade to below grade reduces impact on neighbors. 250 trees to be planted around the site and along the property line screens the adjacent neighborhood from the office building and parking lot. The building observes the 100 feet setback from property line between the office site and residential neighbors to the east. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures shall minimize traffic hazards and shall positively affect the general appearance of the neighborhood and harmonize with adjacent development; and No signage is approved as part of this proposal. Resolution No. 94 ASA -2018-08 (EA -2018-05) August 9, 2018 Page 4 d) With respect to new _ projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures The proposed revision of the parking structure from above grade to below grade reduces impact on neighbors. 250 trees to be planted around the site and along the property line screen the adjacent neighborhood from the office building and parking lot. The building observes the 100feet setback from property line between the office site and residential neighbors to the east. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the addendum prepared for the proposed changes to the project, maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 4 thereof, the Administrative Hearing Officer hereby: 1. Determines that the Eighth Addendum to the Apple Campus 2 EIR (file no. EA - 2018 -05) reflects the independent judgement of the Administrative Hearing Officer; and 2. Adopts the Eighth Addendum to the Apple Campus 2 EIR; and 3. Approves the application for an Architectural and Site Approval, Application no. ASA -2018-18; and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the public meeting record concerning Application No. ASA -2018-18 and EA -2018-05 as set forth in the Minutes of the Administrative Hearing Meeting of August 9, 2018, and are incorporated by reference herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set prepared by Foster + Partners, OLIN, and Luk and Associates consisting of 36 sheets labeled "Tantau 14 Building Apple Park Phase 2", except as may be amended by conditions in this resolution. 2. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file nos. GPA -2011-03, Z-2011-03, DP -2011- 04, U-2011-11, ASA -2011-14, T,M-2011-03; ISA -2011-01, EA -2011-12 and TR -2011-39 shall be applicable to this approval. The conditions of approval set forth shall be incorporated into and annotated on the building plans. Resolution No. 94 ASA -2018-08 (EA -2018-05) August 9, 2018 Page 5 3. ACCURACY OF PROTECT PLAINS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property' size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 4. DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible, in accordance with the City's Recycling and Diversion of Construction and Demolition Waste under Chapter 16.72 of the Cupertino Municipal Code. The applicant shall provide evidence that materials were recycled prior to issuance of final demolition permits. 5. LIGHTING On-site lighting must be in conformance with Cupertino Municipal Code Chapter 19.60 and automatic teller machine lighting, specifically, shall meet minimum standards required by the State of California Business and Professions Code. 6. LANDSCAPE DOCUMENTATION PACKAGE Prior to issuance of building permits, the applicant shall submit a full Landscape Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape Ordinance. The Landscape Documentation Package shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits, and additional requirements per sections 14.15.050 E, F, G, H, and I will be required to be reviewed and approved prior to final inspections. 7. LANDSCAPE AND IRRIGATION PLANS The applicant shall submit detailed landscape and irrigation plans to be reviewed and approved by the Directors of Community Development and Public Works or his/her designee prior to issuance of building permits. The landscape plan shall include water conservation and pesticide reduction measures in conformance with Chapter 14.15, Landscape Ordinance, and the pesticide control measures referenced in Chapter 9.18, Stormwater Pollution Prevention and Watershed Protection, of the Cupertino Municipal Code and shall also be amended to ensure that: a. Additional landscaping in the area closest to the right of way is incorporated through ground -level landscaping and/or in appropriately sized planter pots within the plaza area. The landscape planter box, fencing, landscaping, irrigation and/or plaza area design shall be reviewed and approved by the Director of Community Development prior to issuance of building permits; and Resolution No. 94 ASA -2018-08 (EA -2018-05) August 9, 2018 Page 6 b. A medium sized shade tree is planted at the plaza area subject to review and approval by the City in consultation with the City's Consulting Arborist; and c. The final list of replacement trees is approved by the City in consultation with the city's consulting arborist to reduce the number of crape myrtle trees proposed as replacement trees. 8. LANDSCAPE AND IRRIGATION MAINTENANCE Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be established and submitted to the Director of Community Development or his/her designee, either with the landscape application package, with the landscape installation report, or any time before the landscape installation report is submitted. a. Schedules should take into account water requirements for the plant establishment period and water requirements for established landscapes. b. Maintenance shall include, but not be limited to the following: routine inspection; pressure testing, adjustment and repair of the irrigation system; aerating and de -thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of failed plants; weeding; pest control; and removing obstructions to emission devices. c. Failed plants shall be replaced with the same or functionally equivalent plants that may be size -adjusted as appropriate for the stage of growth of the overall installation. Failing plants shall either be replaced or be revived through appropriate adjustments in water, nutrients, pest control or other factors as recommended by a landscaping professional. 9. LANDSCAPE AND IRRIGATION INSTALLATION REPORT The project is subject to all provisions delineated in the Landscape_ Ordinance (CMC, Chapter 14.15). A landscape installation audit shall be conducted by a certified landscape professional after the landscaping and irrigation system have been installed. The findings of the assessment shall be consolidated into a landscape installation report. The landscape installation report shall include, but is not limited to: inspection to confirm that the landscaping and irrigation system are installed as specified in the landscape and irrigation design plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that causes overland flow, and preparation of an irrigation schedule. The landscape installation report shall include the following statement: "The landscape and irrigation system have been installed as specified in the landscape and irrigation design plan and complies with the criteria of the ordinance and the permit." Resolution No. 94 ASA -2018-08 (EA -2018-05) August 9, 2018 Page 7 10. SCREENING All mechanical and other equipment on the building or on the site shall be screened so they are not visible from public street areas or adjoining developments. Screening materials/colors shall match building features and materials. The height of the screening shall be taller than the height of the mechanical equipment that it is designed to screen. The location of equipment and necessary screening shall be reviewed and approved. 11. UTILITY STRUCTURE PLAN Prior to issuance of building permits, the applicant shall work with staff to provide a detailed utility plan to demonstrate screening or undergrounding of all utility structures [including, but not limited to backflow preventers (BFP), fire department connections (FDC), post -indicator valves (PIV), and gas meters] to the satisfaction of the Director of Community Development, Public Works, Fire Department, and applicable utility agencies. 12. EXTERIOR BUILDING MATERIALS/TREATMENTS The final building exterior plan shall closely resemble the details shown on the original approved plans. Final building exterior treatment plan (including but not limited to details on exterior I color, materials, architectural treatments, doors, windows, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits to ensure quality and consistency. Any exterior changes determined to be substantial by the Director of Community Development shall either require a modification to this permit or a new permit based on the extent of the change. 13. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with. regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 14. NOTICE OF FEES DEDICATIONS RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you Resolution No. 94 ASA -2018-08 (EA -2018-05) August 9, 2018 Page 8 fail to file a protest within this 90 -day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IST: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT 15. STREET LIGHTING INSTALLATION Street lighting shall be installed and shall be as approved by the Director of Public Works. Lighting fixtures shall be positioned so as to preclude glare and other forms of visual interference to adjoining properties, and shall be no higher than the maximum height permitted by the zone in which the site is located. 16. GRADING AND DRAINAGE Grading shall be as approved and required by the Director of Public Works in accordance with Chapter 16.08 of the Cupertino Municipal Code. All storm drain inlets shall be clearly marked with the words "No Dumping — Flows to Creek" using permanently affixed metal medallions or equivalent, as approved by the Environmental Programs Division. 17. C.3 REQUIREMENTS C.3 regulated improvements are required for all projects creating and/or replacing 10,000 S.F. or more of impervious surface (collectively over the entire project site). The developer shall reserve a minimum of 4% of developable surface area for the placement of low impact development measures, for storm water treatment, unless an alternative storm water treatment plan, that satisfies C.3 requirements, is approved by the Director of Public Works. The developer must include the use and maintenance of site design, source control and storm water treatment Best Management Practices (BMPs), which must be designed per approved numeric sizing criteria. A Storm Water Management Plan, Storm Water Facilities Easement Agreement, Storm Water Facilities Operation and Maintenance Agreement, and certification of ongoing operation'and maintenance of. treatment BMPs are each required. All storm water management plans are required to obtain certification from a City approved third party reviewer. 18. TRASH, RECYCLYING AND COMPOST ENCLOSURES Trash enclosure plans must be designed in accordance with the City's Public Works Guidelines posted at www.cupertino.org/nowaste, and to the satisfaction of the Resolution No. 94 ASA -2018-08 (EA -2018-05) August 9, 2018 Page 9 Environmental Programs Manager. Clearance by the Public Works Department is required prior to obtaining a building permit (CMC 9.18.210 (H) & (K)). 19. OPERATIONS & MAINTENANCE AGREEMENT Developer shall enter into an Operations & Maintenance Agreement with the City prior to final occupancy. The Agreement shall include the operation and maintenance for non-standard appurtenances in the public road right-of-way that may include, but is not limited to, sidewalk, pavers, and street lights. 20. UNDERGROUND UTILITIES Developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate with affected utility providers for installation of underground utility devices. Developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the Director of Public Works. 21. TRANSFORMERS New electrical transformers, telephone cabinets and similar equipment shall be placed in underground vaults. The developer must receive written approval from both the Public Works Department and the Community Development Department prior to installation of any above ground equipment. Should above ground equipment be permitted by the City, equipment and enclosures shall be screened with fencing and landscaping such that said equipment is not visible from public street areas, as determined by the Community Development Department. Transformers shall not be located in the front or side building setback area. 22. WATER BACKFLOW PREVENTERS Domestic and Fire Water Backflow preventers and similar above ground equipment shall be placed away from the public right of way and site driveways to a location approved by the Cupertino Planning Department, Santa Clara County Fire Department and the water company. 23. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMPs), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in grading and street improvement plans. 24. EROSION CONTROL PLAN Developer must provide an approved erosion control plan by a Registered Civil Engineer. This plan should include all erosion control measures used to retain materials on site. Erosion control notes shall be stated on the plans. Resolution No. 94 ASA -2018-08 (EA -2018-05) August 9, 2018 Page 10 25. WORK SCHEDULE Every 6 months, the developer shall submit a work schedule to the City to show the timetable for all grading/erosion control work in conjunction with this project. 26. TRAFFIC CONTROL PLAN The developer must submit a traffic control plan by a Registered Traffic Engineer to be approved by the City. The plan shall include a temporary traffic control plan for work in the right of way as well as a routing plan for all vehicles used during construction. All traffic control signs must be reviewed and approved by the City prior to commencement of work. The City has adopted Manual on Uniform Traffic Control Devices (MUTCD) standards for all signage and striping work in the City. 27. STREET TREES Street trees shall be planted within the Public Right of Way to the satisfaction of the Director of Public Works and shall be of a type approved by the City in accordance with Ordinance No. 125. 28. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City. 29. SANTA CLARA COUNTY FIRE DEPARTMENT A letter of clearance for the project shall be obtained from the Santa Clara County Fire Department prior to issuance of building permits. Clearance should include written approval of the location of any proposed Fire Backflow Preventers, Fire Department Connections and Fire Hydrants (typically Backflow Preventers should be located on private property adjacent to the public right of way, and fire department connections must be Jocated within 100' of a Fire Hydrant). 30. FIRE HYDRANT Fire hydrants shall be located as required by the City and Santa Clara County Fire Department as needed. 31. CALIFORNIA WATER SERVICE COMPANY CLEARANCE Provide California Water Service Company approval for water connection, service capability and location and layout of water lines and backflow preventers before issuance of a building permit approval. 32. DEDICATION OF UNDERGROUND WATER RIGHTS Developer shall "quit claim' to the City all rights to pump, take or otherwise extract water from the underground basin or any underground strata in the Santa Clara Valley. Resolution No. 94 ASA -2018-08 (EA -2018-05) August 9, 2018 Page 11 33. SANITARY DISTRICT A letter of clearance for the project shall be obtained from the Cupertino Sanitary District prior to issuance of building. permits. 34. UTILITY EASEMENTS Clearance approvals from the agencies with easements on the property (including PG&E, AT&T, and California Water Company, and/or equivalent agencies) will be required prior to issuance of building permits. 35. WASTE TRIO AND CIGARETTE BUTT URN Waste trio and 'cigarette butt urn manufacturer specifications must be provided to the Environmental Programs Division for review. Location of waste trio must be. located entirely on private property and in proximity to pedestrian use of the sidewalk. Clearance by the Public Works Department is required ' prior to obtaining a building permit. 36. STORM DRAINS All exterior storm drain- inlets on the parcel must be fitted with full trash capture storm drain catch basin inlet devices to prevent litter from entering the storm drain system. Devices installed must be approved by the California State Water Board and selected from the San Francisco Bay Regional Water Quality Control Board list, which can be viewed at http://www.sfestu.ary.org/approved--t-.rash.-capture-devices. Please include with the resubmittal, the manufacturer specification sheet for all trash capture devices) included with the project. As a condition of approval, the devices must be installed and maintained (cleaned) in accordance with the manufacturer specifications, but not less than two times per year. The property owner must provide official written record of cleaning and maintenance to the City upon request. 37. STORM DRAIN INLET MARKERS All exterior ' storm drain inlets on the property shall be clearly marked with "No Dumping Flows to Creek" or "No Dumping Flows to Bay" markers. 38. COPPER USES PROHIBITED Copper metal roofing, copper granule containing asphalt shingles, copper gutters and downspouts, and/or other exterior ornamental copper are not permitted for use on any commercial or industrial building. 39. C&D WASTE MANAGEMENT PLAN A completed C&D Waste Management Plan must be submitted at the time of building permit issuance. If the applicant and/or their contractor and any Resolution No. 94 ASA -2018-08 (EA -2018-05) August 9, 2018 Page 12 subcontractor working on the project self -hauls the C&D material, a Waste Management Report must be submitted prior to final approval of the building permit demonstrating a minimum of 65% of the C&D waste has been diverted from landfill and recycled. Please note that C&D debris box service may only be obtained from Recology, the City's franchised waste hauler. C&D Recycling information and reports may be viewed at w'ctiwv.cupertino.org/greendev. 40. RECOLOGY REVIEW The location, path of travel, and associated design features of the on-site trash enclosure will be required to be reviewed by Recology, the City's franchised waste hauler, and approved by the Public Works Department prior to building permit issuance. SECTION V: CONDITIONS ADMINISTERED BY THE BUILDING DEPT. 41. ACCESSIBLE PATH OF TRAVEL The applicant shall provide accessible path -of -travel from the building to the trash enclosure per 2016 California Building Code. SECTION VI: CONDITIONS ADMINISTERED BY SANTA CLARA COUNTY FIRE DEPT. 42. FIRE SPRINKLERS Certain structures may require fire sprinkler coverage under exterior roof overhangs. Such areas must be reviewed by a properly licensed contractor. If the fire sprinkler system is to be modified, a State of California licensed (C-16) Fire Protection Contractor shall submit plans, calculations, a completed permit application and appropriate fees to the Santa Clara County Fire Department for review and approval prior to beginning their work. 43. CONSTRUCTION SITE FIRE SAFETY All construction sites must comply with applicable provisions of our Standard Detail and Specification SI -7 and Chapter 33 of the currently adopted edition of the California Fire Code. This must be submitted to and approved by this office prior to commencing any demolition/construction activities. 44. PUBLIC FIRE HYDRANT(S) REQUIRED Identify the location of the existing public fire hydrant(s). Maximum hydrant spacing shall be 500 feet, with a minimum single hydrant flow of 1,750 GPM at 20 psi, residual. Fire hydrants shall be provided along required fire apparatus access roads and adjacent public streets within 100' of the fire department connection (FDC). Resolution No. 94 ASA -2018-08 (EA -2018-05) August 9, 2018 Page 13 45. WATER SUPPLY REQUIREMENTS Potable water supplies shall be protected from contamination caused by fire protection water supplies. It is the responsibility of the applicant and any contractors and subcontractors to contact the water purveyor supplying the site of such project, and to comply with the requirements of that purveyor. Such requirements shall be incorporated into the design of any water-based fire protection systems, and/or fire suppression water supply systems or storage containers that may be physically connected in any manner to an appliance capable of causing contamination of the potable water supply of the purveyor of record. Final approval of the system(s) under consideration will not be granted by this office until compliance with the requirements of the water purveyor of record are documented by that purveyor as having been met by the applicant(s). 46. ADDRESS IDENTIFICATION New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall be a minimum of 4 inches (101.6 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). PASSED AND ADOPTED this 9th day of August, 2018 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: /s/Catarina Kidd Catarina Kidd Senior Planner APPROVED: /s/Benjamin Fu Benjamin Fu Asst. Director of Community Development ristar -i- Partnf; dbig M, ow 'k Ir V_ so 91 1. - 'iJo a 411111— �Ar owe qlw lip logo Al V" 100 Pr OF. wo magwoontm —disk— A Alm -A al jf low-, ld 41 J.. Im= kpple campus 2 Fnas qorth Tantau Ave Site E !'Iitp. & ArchitP.CtHral Revip, offoloi -4 �_k lw� �4_ A04 5k 4. jT - Roftf- _4 -re P7 IV YaAii� i m i�sffl AT,. JF F AL IL .4. 10 001 000 it �71 all - :4 �6. tow 4w loo, 4jr 7- 4p. 4 AOF 1 �6 4A TI% -14r Mmdd&L q j4' �4k Project Team OWNER APPLE INC. 1 Infiniite Loop MS 47-2 REF Cupertino, CA 95014 PHONE: 408 996 1010 CONTACT: Dan Whisenhunt EMAIL: dwhisenhunt@apple.com ARCHITECT FOSTER + PARTNERS 1000 Sansome Street Suite 240 San Francisco, CA 94111 PHONE: 408 610 5800 CONTACT: Peter Sokoloff EMAIL: psokoloff@fosterandpartners.com LANDSCAPE ARCHITECT OLIN STUDIO 150 South Independence Mall West Philadelphia, PA 19106 PHONE: 215 440 0030 CONTACT: Sarah Williams EMAIL: swilliams@theolinstudio.com Project Description Site B - Tantau 14 Office Building Apple proposes to develop Site B of Phase 2 of Apple Campus 2. The site is delimited by Tantau Avenue to the West, Pruneridge Avenue to the North and Calabaza's Creek to the South. When finished the building will anchor the corner of Tantau and Pruneridge and complement both Visitor Center and Tantau Visitor Gate buildings completing Apple Park's East gateway. The project replaces the current disjointed assemblage of aging corporate faclities with a high performance state- of-the-art office facility. The building is located in a unified and partially secured landscape, which extends and connects the interior workplaces to outdoor faclities for relaxation, recreation and reflection. The 84,000 square feet two story building will have capacity to house up to 500 working spaces. The subterranean parking structure, which will hold close to 600 vehicles on three levels, will meet the building and compliment phase 2 development parking needs. This new development will continue to provide an environment reflecting Apple's brand values of innovation, ease of use and beauty. Among the project goals is to promote shared creativity and collaboration; to spur and encourage invention of the next several generations of Apple products. Project Objectives • Site B of Apple Park Phase 2 will result in replacement and rebuilding of the entire approximately 4.33 acre site with office space. The main objective of the project is to redevelop the site with a new, secure and private Apple building in close proximity to Phase 1 of Apple Park. The project's specific objectives are to: • Create an innovative and beautiful building adjacent to Apple Park that consolidates up to 500 of Apple's employees in distinctive office space with supporting facilities. The purpose of consolidation is to promote shared creativity and colaboration, and spur invention of the next several generations of Apple products. • Achieve the security and privacy required for the invention of new products by eliminating public access CIVIL through the site East of Tantau Avenue and south of Pruneridge Avenue. LUK & ASSOCIATES 738 Alfred Nobel Drive Hercules, CA 94547 PHONE: 510 724 3388 CONTACT: Manish Dalia EMAII: manish@lukassociates.com • Maximize the provision of green space, and design this space in acoordance with the climate and history of the area. • Create a building that incorporate flexibility to respond to Apple's future business needs. • Achieve a net zero energy development by constructing energy efficient buildings, generating a significant amount of the Campus energy from on-site renewable sources, and developing partnership with renewable energy providers or grid -purchased renewable energy. List of Drawings General Overview P-TA14-1.00 Site Plan - Site B Proposed Cover Sheet P-TA14-1.10 P-TA14-2.30 List of Drawings / Project Overview P-TA14-1.20 Perspective View - Pruneridge Avenue Looking West Project Data Table / Project Location P-TA14-1.21 Site - Civil Development Area Analysis P-TA14-1.22 Existing Topography Amenity Area - Level 01, Level 02, Roof P-TA14-1.30 P-TA14-3.30 Proposed Conceptual Site Plan P-TA14-1.40 Stormwater Quality BMP - Typical Details Existing Site Plan P-TA14-1.50 P-TA14-3.50 LEED Summary Site - Masterplan P-TA14-2.20 Site Plan - Site B Proposed P-TA14-2.21 Site Plan - Site B Proposed - Fire Access & Accessibility P-TA14-2.30 Site Sections P-TA14-2.40 Perspective View - Pruneridge Avenue Looking West P-TA14-2.41 Perspective View - Pruneridge Avenue Looking East Site - Civil P-TA14-3.00 Existing Topography P-TA14-3.10 Proposed Grading Plan P-TA14-3.30 Proposed Storm Water Control P-TA14-3.31 Stormwater Quality BMP - Typical Details P-TA14-3.40 Existing Utilities Plan P-TA14-3.50 Proposed Utilities Plan Site - Landscape P-TA14-4.00 P-TA14-4.10 P-TA14-4.15 P-TA14-4.16 P-TA14-4.20 P-TA14-4.21 P-TA14-4.30 P-TA14-4.31 P-TA14-4.32 P-TA14-4.33 P-TA14-4.34 P-TA14-4.40 P-TA14-4.41 P-TA14-4.50 P-TA14-4.60 P-TA14-4.70 P-TA14-4.80 Existing Tree Plan Proposed Tree Disposition Plan Tree Disposition Plan - North - Apple Park Overall Project Tree Disposition Plan - South - Apple Park Overall Project Landscape Plan Landscape Plan Rendering Landscape Plan - Trees - Site B Planting Plan - Herbaceous Planting Plan - Trees - Site C+D Planting Palette Planting Schedule Materials Plan Landscape Materials References Site Lighting Diagram Site Furnishings References Site Wall Diagram Site Sections General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All levels are in feet and inches unless noted otherwise. 4. All dimensions shall be verified on site before proceeding with the work. 5. Foster + Partners shall be notified in writing of any discrepancies. 6. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review F+P • Minimize use of potable water through using recycled water, if available as a result of projects now under Rev. Date Reason For Issue Chk considertion, and improve runoff by increasing permeable surfaces. Architecture -Tantau 14 PLANNING APPLICATION • Enable a commuting culture where throughtful site planning and regional connectivity coupled with a robust P-TA14-5.00 Plan View Level B3 Key Plan. TDM program prioritize transit and active ammute modes. P-TA14-5.01 Plan View Level B2 Pruneridge Avenue P-TA14-5.02 Plan View Level 131 Exceed economic, social and environmental sustainability goals through integrated design and P-TA14-5.03 Plan View Level 01 development. P-TA14-5.04 Plan View Level 02 & Roof Level P-TA14-5.10 Sections • Create a campus that reflects Apple's business and design practices, and allows for a long-term presence in P-TA14-5.20 Elevations - East, West, North & South Cupertino. P-TA14-5.30 North Facade - Rendered Elevation & External Materials F _ I L - I I I � I � J a Q Permits and Approvals Associated with this Application N z Apple is seeking from the City of Cupertino the approval listed below: O • Architectural and Site Approval • Minor Modifications to the October 2013 and February 2016 Development Permit. Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title List of Drawings Project Overview Project No. Date Scale at Arch E1 2193 01/31/2018 NTS Number Revision P-TA14-1.10 00 0 1 Project Location 1" = 200'-0" N O liffliffliffliffliffW PRUNERIDGE AVE. PROJECT DATA TABLE - SITE B Development Permit Di'rector's Minor Mod Site Information October 2013 October 201 (Site C +0 SITE AREA SITE B 4.50 acres n/:3 SITE NET AREA - SITE B 4,50 acres 0/a SITE COVERAGE - SITE B 5 5°)/o n/a TOTAL H.AF DSCAPE AREA - SITE B 2.66 acres n/a TOTAL SFTSCAPE AREA - SITE B 1.88 acres n/a GENERAL FLAN DESIGNATION INDUSTRIAL/OFFICE ZONING DESIGNATION P(MP) GENERAL PLAN! PLANNING AREA NORTH VALLCO PROPOSED USES Office/ R&D HOURS OF OPERATION 7arra-7prn NUMBER F EMPLOYEES - SITE B 800 NUMBED OF EMPLOYEES - SITE C+D" 1,400 ' NOT PAW OF THIS SUB NIi FrAL INDU TRIAI OFI`iCE P(MP) NORTH VALLCO Office R&D 7arr1-7plrl 800 1400 Architecture I Site review .January 2018 (Site E 4.33 -acres 4,32 acres 28% 2.69 acres 1.63 acres I f DU TRIAL/OFFICE PM P) NORTH VALLCO Office / R&D 7 am -7 pm 600 1400 SURF -ACE PARKING - SITE B 200 200 105 STRUCTURE - SITE B 200 200 n/a BASEMENT - SITE B 200 200 436 UFFACE PARKING - SITE C+D* 300 220 (see DIR-2015-15 & C1304) 220 BASEMENT (WEST OF TANTAU * 350 276 (see DIR-201,E-15 & C1394) 276 BASEMENT (EAST OF TANTAU)� 490 0 0 TRU CTU R E (EAST OF TANTAU)' n/a 644 (see D I R-201,5-1.5 &. CBO4) 644 TOTAL PARKING SPACES - SITE B 600 600 600 TOTAL PARKING SPACES - SITES C+D* 11140 1,140 1,140 NOT PART OF THIS SUBMUTAL GLADE LEVELS (PODIUM) OFFICE BUILDING - SITE B +-160 EXCAVATION - SITE B OFF -HAUL - SITE B TOTAL EXCAVATION - PHASE 2 160,000 CY (SITES B+C+ D) TOTAL OFF -HAUL - PHASE 2 160,000 CY (SITES B+ +D) Development Permit Building Information October 2013 OCCUPIED BUILDING AREA 0 sq ft PHASE 2 OFFICE - SITE B 75,000.sq ft 1,900 EMPLOYEES TESTING FACILITIES - SITE C* 22,000 sq ft 1,740 PARKING SPACES OFF=ICE - SITE D' 250,000 sq ft RESTAURANT - SITE Dk 29,090 sq ft ' NOT PART OF r H I_ SUS kil TTAL 0 sq ft A Area indicated is inciu5ive of amenity area SITE B 500 EMPLOYEES 600 PARKING SPACES SITE C SITE D AME 17Y AREA AME 11TY SPACE - SITE B 0 sq ft SATELLITE PLANT- SITE B 12,000 sq ft AMENITY SPACE - SITE G* 0 q ft SATEUTE PLANT - SITE C' 30,060 sq ft SERVER ROOM - BASEMENT - SITE G* 0 sq ft AMENITY SPACE - SITE D- 0 sq ft ' NOT PART OF THIS SUB#,AfTTAL :5 Amer,lly area InrJ--jded in ocrup-ed area GROSSAREA Gross Area - Site B 87,000 sq ft Gress Area - Site C' 255,000 sq ft Gross Area - Site D" 509,900 sq ft TOTAL 642,000 sq it ` NOT PART OF THIS SUB MI -F AL OTHER PARKING STRUCTURE - SITE B 200,000 sq ft 2 STORIES) PARKING BASEMENT - SITE B 61,000 sq ft (1 LEVEL) PARKING STRUCTURE - SITE C* 0 sq ft PARKING BASEMENT - SITE D* 336,000 sq ft 3 LEVELS) Nt)T PART OF THIS SUBMITTAL BUILDING HEIGHT OFFICE BUILDING - SITE B 5'-0" (2STORIES) PARKING ]G Tf UCTURE - SITE B 15'-C" (1 LEVEL) SITE C+D 1,400 EMPLOYEES 1,140 PARKING SPACES NOT PART OF THIS SUBMITTAL REFERENCE DIR-2016-12 GLASS REFLECTIVITY FIR MITGATION n/a 25,000 CY (see memo) 20,000 CY see rn rune 146,000 CY (SITES B+C+D) 120,000 CY (SITES B+C+D) Director's Minor Mod October 2010 (Site G+D 84,000 sq ftp' 210,540 sq fit'°' 2941185 sq ft's 14,895 sq ft 0 sq #tB 1,247 sq ft 0 Sq fte 11600 sq ft (see D1 R-2015-15) 26,534 sq ft see Di R-2015-15) 0 sq ft" 85,247 sq ft 247,674 sq ft 509,0'9 sq f# 642,000 sq ft 2001000 sq ft 2 STORIES) 51,000 sq ft 1 LEVEL) 268,001 sq ft (see DIR-2015-15) 110,000 sq fi na n/a 711/0 15-20/0 88,000 CY 88,000 CY 208,000 CY (SITES B+C+D 185,000 CY (SITES B+C+D Architecture Site review January 201 69,386 sq ft 120,660 sq ft 289,954 sq ft 14,81D6 sq ft 15,861 sq ft n/a 08,880 sq it 1,609 sq f# 261634 sq fir 4,229 sq ft 85,247 sq ft 247,074 sq ft 509,079 sq ft 642,000 sq -ft 0 sq ft -193,000 sq ft (3 LEVEL 268,001 sq ft (5 STORIES) 1 10,000 sq Ft (1 LEVEL) 36'-0" (2 STORIES) n/a 15-20% General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All levels are in feet and inches unless noted otherwise. 4. All dimensions shall be verified on site before proceeding with the work. 5. Foster + Partners shall be notified in writing of any discrepancies. 6. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review Rev. Date Reason For Issue PLANNING APPLICATION Key Plan. Pruneridge Avenue _�LIJ F+P Chk N �z ❑ O Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Project Data Table Project Location Project No. Date Scale at Arch E1 2193 01 /31 /2018 1 " = 200'-0" Number Revision P-TA14-1.20 00 i estaurill [ every - I I I I r I Restaurant, Espresso Bar 14,896 sf. I I I i I I Cafe /Coffee 2,450 sf, Mechanical Penthouse 1x779 sf. I I I I I 4.871 3f. I I I I Restaurant Kitchen I 19,125 sf, I I I I r I Office Floor Area 944/6 289,954 sf. I I I I I I I I I .5 I I I I h -r � I I I -JLI I 1 k Client Apple Inc. ❑ I 1 ♦ �� � r' i �` I I I r I � I_ I I I I I I � k I Project ' VA Tantau 14 Building I sf. Apple Park I w safe I offArea �-�..� I Phase 2 11 I I I I I r'V1 I I i I I I Title F0' k p `� f Li Development Area Analysis I I r I Level 1 Nortel Level 1 South Core (Level -4 Borth & South CDreS Similar) r ; I I I I i N I I I I I I I I I i ; Project No. Date Scale at Arch E1 2193 01/31/2018 NTS Office Level 1 Office Level 2-4 Office Roof Number Revision P-TA14-1.21 00 Development Area Analysis - Phase 2 Office Building - Site B General Notes 1. Do not scale drawings. Dimensions govern. Tantau Development - Office Building - Site B Gross Area 851247 2. All dimensions are in feet and inches unless noted otherwise. 3. All levels are in feet and inches unless noted otherwise. Specific Features 4. All dimensions shall be verified on site before proceeding with the work. 5. Foster + Partners shall be notified in writing of any discrepancies. Amenity Floor Area 18,611/4 6. Any areas indicated on this sheet are approximate and indicative only. Planned Area Calculations - Phase Workshop +Testing 14,992 sf_ Tantau Development f — — — — — � - - M Cafe / Coffee 469 st, Specific Features I I I � Mechanical Penthouse 400 sf. _ I I 15,861 sf. % K j ❑ IPL A I E I i""'� APPLE I I I I Office Floor Area 81,40la 69,386 sf. Building Cross Area Arrleni-ly Area Office Area Phase 2 642,400 WOR SHOP & TESTING 110,900 Site D - Office 289,954 1 1 1 1 1 I 1 I AT LLITE PLAT I Site C - D Ner�h 40,450 1 1 I I CAFE 3.951 Site C - R&D South 80,204 ; 1 I I 1w RESTAURANT 14,896 Site D Office 03,886 I I MECHANICAL PENTHOUSE 4.119 1 1 DATA CE 1-11 EH 26,534 I I 1 = Total 642,000 162!,000 480,000 1 1 I E > Source. Poster + Partners 2'016 1 1 1 I I :31 1 1 I I 1 I I `- PHASE LEE1D-------- Approved Development Area: 642,000 sf. Workshop & TestingTesting Facilities North - Site C satellite Plank Development Area Analysis - Phase 2 Gross _ Tantau Development - Testing Facilities - Site C Total Amenity Area: 162,000 sf. Cafe Specific Features 72,274 Sf. Total Office Area: 480,000 sf. 7! Restaurant taurant Amenity Floor Area 44% � Total res Area: �� (� sf. 0 Mechanical Penthouse Testing Facilities North Site C - i___-_.� I---^---- � �T--- Workshop + Testing 30,900 sf. Data Center I I I I Cafe /Coffee 344 sf. � � �. Unallocated Amenity Area: Off I I I I I I I I Mechanical Penthouse 574 sf. ! I ; , i ' 31,818 sf. ,•` I I I I I Office f=loor Area 56% 00 01/31/2018 Planning -Site&Architectural Review F+P 409456 Sf• Rev. Date Reason For Issue Chk PLANNING APPLICATION I M I I I I I Key Plan. I I I r 1g I I I I Testing Facilities South - Site C runeri eAvenue I -------r I I � _IGrossArea � -- Proposed Testing Facilities South Site C 147,266 Sf. i I I I I Amenity Floor Area 454/0 I I I I Workshop + Testing 65,008 sf. 1 I I I lim Cafe / Coffee 688 sf, I1 r� I , Mechanical Penthouse 1,356 sf. 67,062 sf. Development Area Analysis - Phase I� `I i i C: J I I I Office Floor Area 55 /o Q' Tantau Development - Office 130ding - bite D $0,204 sf. cu pedfkc Features - Core I I ; I ; I �(u 1 I I k I I N z ' I ' k Foster + Partners I 1000 Samsome Street i I I Suite 240 San Francisco, CA 94111 -- - - - - - - - - - - - - - - - i - - - - - - - - - -- - - - - - - - - - - - - Area Calculation Level 1 Level 2 I Level 8 Level 4 Total I I I + I I � T 408 610 5800 www.fosterandpartners.com I I © Foster + Partners 2017 { I I I I I I I OLI N i Ies#urant Iflin, 7,82 I I pq I I LANDSCAPE ARCHITECTURE AND URBAN DESIGN { I « ss — — — _ I I — — — — , _� Public Ledger Building, Suite 1123 I Restaurant 7, 622 sf• * I Restaurant dining Cafe Coffee 350 700 700 700 * 2,4,50 Level 81 Level 1 Level 2 Roof 150 South Independence Mall West Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 a I I Total 17,346 www.theolinstudion.com OLIN Partnership. Ltd Development Area Analysis -Phase 2 Office Building - site °Gross Area Luk and Associates - I Tantau Development - Office Building - Site ❑ 09 0 738 Alfred Nobel Drive Specific Features Hercules, CA 94547 I I I I ,403 f Amenity Floor Area 64/0 T w.l10 724 3388 www./ u kassociates. cum soca i estaurill [ every - I I I I r I Restaurant, Espresso Bar 14,896 sf. I I I i I I Cafe /Coffee 2,450 sf, Mechanical Penthouse 1x779 sf. I I I I I 4.871 3f. I I I I Restaurant Kitchen I 19,125 sf, I I I I r I Office Floor Area 944/6 289,954 sf. I I I I I I I I I .5 I I I I h -r � I I I -JLI I 1 k Client Apple Inc. ❑ I 1 ♦ �� � r' i �` I I I r I � I_ I I I I I I � k I Project ' VA Tantau 14 Building I sf. Apple Park I w safe I offArea �-�..� I Phase 2 11 I I I I I r'V1 I I i I I I Title F0' k p `� f Li Development Area Analysis I I r I Level 1 Nortel Level 1 South Core (Level -4 Borth & South CDreS Similar) r ; I I I I i N I I I I I I I I I i ; Project No. Date Scale at Arch E1 2193 01/31/2018 NTS Office Level 1 Office Level 2-4 Office Roof Number Revision P-TA14-1.21 00 AMENITY SPACE - 8,402 SF 6,590 SF 14,992 SF = CAFE/ COFFEE - 469 SF 469 SF r7l MECHANICAL PENTHOUSE - D PENTHOUSE -NOT SIGNIFICANTLY ENCLOSED - L= UNOCCUPIED MECHANICAL - 400 SF 400 SF N/A N/A General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All levels are in feet and inches unless noted otherwise. 4. All dimensions shall be verified on site before proceeding with the work. 5. Foster + Partners shall be notified in writing of any discrepancies. 6. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning -Site & Architectural Review F+P Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. 4" m a co ., Pruneridge Avenue J Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Amenity Area Level 01, Level 02, Roof Level 01 - Amenity Area Plan Level 02 - Amenity Area Plan Roof Level - Amenity Area Plan N Project No. 2193 Number P-TA14-1.2z Date Scale at Arch E1 01/31/2018 1 If = 201-01 1 Revision 00 W W y � 1 1 0 M AHU PAD AHU PAD %06 %01 AIR CHILLER PAD EQUIPMENT PAD 0 %01• %06 7 AHU PAD Z. AHU PAD 0 M r7l MECHANICAL PENTHOUSE - D PENTHOUSE -NOT SIGNIFICANTLY ENCLOSED - L= UNOCCUPIED MECHANICAL - 400 SF 400 SF N/A N/A General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All levels are in feet and inches unless noted otherwise. 4. All dimensions shall be verified on site before proceeding with the work. 5. Foster + Partners shall be notified in writing of any discrepancies. 6. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning -Site & Architectural Review F+P Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. 4" m a co ., Pruneridge Avenue J Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Amenity Area Level 01, Level 02, Roof Level 01 - Amenity Area Plan Level 02 - Amenity Area Plan Roof Level - Amenity Area Plan N Project No. 2193 Number P-TA14-1.2z Date Scale at Arch E1 01/31/2018 1 If = 201-01 1 Revision 00 s Y ,) F'i T 16 -' 1: APIA L ■ .r. . 1 1 L L J'L - _ T. je 9 ti L ti • r. -9? " L't-A AF -M , 4o 3. 6 IL ak�__ 191f Ldp r , F ti ' A• ar W6 ' ■ r1 _ ice" F -0 w a 00 0 r 4 T � Y� �' ■ INIL JL',J ;AL�% 444L•. - _� F R ,OIL - * { .0 11 1 ., -I! - zA A� r I% �OT_iiso_ 111 L r ir WE 911.1; M. � -0 r Ip i e c ir iiip� JIL- rLr A MW li,j hr ■ IF T-` t , d al S ,r 9 , rI ■' 1 ■1'■ J T r 1 - — - V-4 - 171• - L _L J• 1 ■ IN Ir 1 T f- - 7 _ iwt 0 Ill r , 11 0 r 1 _ ti .Y J'1 z L , 1 f J 96j r r- i L ■ 1 llf i J mi�6 L IL or L N;F- 1'1 ti 10 rA ICL 16 1 F _L 1 . ■ L off do r - rMr.Y ■ �' •1 `' , ' F 'r� f l . J L r _ T , , A _ Ar �r rj 1 6" A t M IF Ll A IL I It .16 k 1 4L4 L lb rr L •+ _ t 1Ile 11 M LF . �A . I 11'` 1�'� 1 S • jrF ■ 1 Jr 1 �' ' - 56_ _W, r IIF L .1 _ ■ i Ir 9. 40 4 ■ L r ! _ r'0 11 + — 1 1 , 1 r � i' err '' � � 1 R.- •.r f-.1 7 - - Yom, . • •.1 7 iii r IN L !: 1�- - L 960-1 1 1 1 L _61_ • J 1 - �_ , - ' Fr - or 1 1 _ 1iiiiiiiall_GIS■+' L T♦ �■ . T r. I L4 f l . 1� . `■ ;L _ *1• Ar IF _i'!r , i ,{ • , IN i�1 r ~ . + !61 IP � 1 4v r s FF� r -.1 IN - L 16 ■1 .. T� r L ' 1 - 7 1 i I ''1 ■„r _ LIL Ni L Ar Lr ■til ti IL`�• T .`1`11 - � 1. r 1'05 F 1 AL pr 1A T YL rgu _ r;X-C 1 1 r ■ J T _ r -y �,■ _ 316 9r I ark L Oro T ' '•k' ■ r F ' 1 F9 .16 Im- ir it 11 ;p J ` S. 'J / •� rr 1 it lk a T L _ ` L 1 MI N ry-5 _.M Ar r of - Ar ZEF 1 q: hl s 11. -I.M%vj t • _ .. _ . r t6 va 1FlIp _ fi 1 . yr IN -IF _ IL br I. Mb p4 IF Iku MI � ld W. i r r — r � �♦ z. ' i 1 I 1 1 1 i 1 I ; 1 1 1 N 1 Q® I 1 1 ------------------------- 1co; CU c1 1 1 �]N0 � ; CU z 1 o I 1 1 ,` o • z �]NO i 1 1 ` 1 1 i own nnn� °1 °i of z ---------------------- --t °i ---------- ------- / e venue ----------------------- °; 01 OU % II 00 c Tantau 4 10600 N. Tantau Ave 23,595 square feet 1 1 M% 1 00 1 ; 1 i _ 1 1 ; 1 ; 1 ; 1 ; 1..... .._._.�t - � 1 � - 1 .6 - 1 . 1 - � 1 1 i db i GCeey- 000 > •'• N co Kim Tantau 3 10590 - 10596 N. Tantau Ave 64,680 square feet 0 V10 - I Ile 1 1 1 I 1 1 1 1. Topographic survey information on these plans has 1 been obtained November 15th, 2012 from Kier & Wright surveyors, dated November 15,2012, and subsequent field survey. 1 j 2. Property Line information on these plans has been obtained from Kier & Wright surveyors, recorded December, 2014 - Parcel Map. 1 1 1 1 1 1 _ ..On — i ■—•—• so '1110 1 1 i 1 1 1 • 1 ' 1 00 1 1 1 100141010.00 00 01/31/2018 Planning - Site & Architectural Review F+P Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. \ Pruneridge Avenue a� Q Now a 1 1 1 1 __ N z ' ' • 006 1 .00. 100 .•'.00 .' •,..• Foster + Partners ■ t �•I 1 1000 Samsome Street Suite 240 •�• San Francisco, CA 94111 T 408 610 5800 1 •I• www.fosterandpartners.com © Foster + Partners 2017 1 OLIN 1 •� LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadephia, PA 19106 / T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com • OLIN Partnership. Ltd 1 ` Luk and Associates 1saw. 0 00,—• / _ —'—' _ • _ . • —' w' 738 Alfred Nobel Drive ■ . - • Hercules, CA 94547 T 510 724 3388 100• www.lukassociates.com 6100 %0.00 i j/ ; ♦� �' �Client - i /\ ♦�'. .�'�' _%� Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Existing Site Plan Project No. Date Scale at Arch E1 2193 01/31/2018 1 " = 40'-0" Number Revision P-TA14-1.40 100 Apple Tantau Ph.2 - TA14 Building LEED NC 2009 Scorecard -Individual Project 12f7/2017 Certified 40-49 Silver 50-59 Gold 60_.79 Platinum 80+ I ?N N 2.31 2 1 1 1 0 5 y �f• 2 3 1 M 111111 y y<y y: Prereq 1 Water Use Reduction, minimum 0% reduction �:N:NrN:k 4 an MI i ffJJ=TP � , d credit 1 Water Efficient Landscaping, Reduce by 50% l Credit 2L Innovative a tewater Technologies �1 C resit Water Use Reduction, target 40% reduction n/a 1 b 1 6 1 3 2 1 1 n/a .-4 2 2-4 12 2 2 19 a • - o - v>� vu��N:N:N: N:k: y:N:N:N:k Prereq 1 Fundamental Commissioning of the Building Energy System n/ Jx:N:. J u v v a .. ..�N.N:N:N.N. x+ y 01 NNNN: Prereg2 Minimum EnergyPerformance - (10 � Requirement) t1T N rx ±rrrNr` Y+VJY Prerq Fundamental Refrigerant Management n/a ... . 1-21 11 credit 1 Optimize Energy Performance, Target 18 - 8% energy cost Savin( 1-19 11 credit 2 n- bite Renewable Energy, 10/o to 130/4 1-7 cre`1it ^ Enhanced Commissioning 2 - 11 Credito Enhanced Refrigerant Management 2 C credit £ Measurement & verification 3. . Credit Green Power 35% ff"oCredit 1 1 Innovation - SSc4, Comp. Transportation Mgmt Plan 1 .1 C c rredi t 1 .,? Exemplary - MRc7, 95% � 1 0 credit 1 i Innovation - Green Cleaning � ' it credit 14 Innovation - Integrated Pest Management I d credit 1.5 Innovation - Green Power, 70% 1 Credit i LEEDTm Accredited Professional . O 1 Tantau 14 LEED Score Card Master Site Credits - Apply to Entire Site I ?N N 0000 NVr�NNkN:::NNNN: :N;N N Prere 1 q Construction Activity Pollution Prevention Prereq 1 sIII 11 Credit l .i Building Reuse, Maintain Existing VV'alls, Floors & Roof -OEM mmnm� ! Credit 1 Site Selection Construction Waste Management, Divert 50% C (! resit 2 Development Density & Community Connectivity i Materials Reuse, Specify 5% 1C credit Brownfield Redevelopment 6 Credlt4.1 Ell redit4.-i Alternative Transportation, Public Transportation Access v ode Credit5.1 Ciedit_; Alternative Transportation, Bicycle Storage & Changing Rooms Credit{ ? Regional Materials, 0% t� Ciedi[4.11 Alternative Transportation, Low Emitting & Fuel Efficient vehicles C Credit? Certified Wood, 5011/o Credito 4 Alternative Transportation, Parking Capacity 1 credit B Credit 5.1 .Site Development, Protect o r RestD re Ha bitat (or 0% of site a rea ) 1 Daylight views, views for 90% of Spaces tl Credit 55.2 Mite Development, Maximize Open Space C� Credit 6.1 Stormwater Design, Quantity Control Credit 6.? Stormwater Design, Quality Control C credit 7. i Heart Island Effect, fon-Roof Credit 7.2 Heart Island Effect, Roof 11 credit 8 Light Pollution Reduction 5 y �f• 2 3 1 M 111111 y y<y y: Prereq 1 Water Use Reduction, minimum 0% reduction �:N:NrN:k 4 an MI i ffJJ=TP � , d credit 1 Water Efficient Landscaping, Reduce by 50% l Credit 2L Innovative a tewater Technologies �1 C resit Water Use Reduction, target 40% reduction n/a 1 b 1 6 1 3 2 1 1 n/a .-4 2 2-4 12 2 2 19 a • - o - v>� vu��N:N:N: N:k: y:N:N:N:k Prereq 1 Fundamental Commissioning of the Building Energy System n/ Jx:N:. J u v v a .. ..�N.N:N:N.N. x+ y 01 NNNN: Prereg2 Minimum EnergyPerformance - (10 � Requirement) t1T N rx ±rrrNr` Y+VJY Prerq Fundamental Refrigerant Management n/a ... . 1-21 11 credit 1 Optimize Energy Performance, Target 18 - 8% energy cost Savin( 1-19 11 credit 2 n- bite Renewable Energy, 10/o to 130/4 1-7 cre`1it ^ Enhanced Commissioning 2 - 11 Credito Enhanced Refrigerant Management 2 C credit £ Measurement & verification 3. . Credit Green Power 35% ff"oCredit 1 1 Innovation - SSc4, Comp. Transportation Mgmt Plan 1 .1 C c rredi t 1 .,? Exemplary - MRc7, 95% � 1 0 credit 1 i Innovation - Green Cleaning � ' it credit 14 Innovation - Integrated Pest Management I d credit 1.5 Innovation - Green Power, 70% 1 Credit i LEEDTm Accredited Professional . O 1 Tantau 14 LEED Score Card Master Site Credits - Apply to Entire Site I ?N N 0000 WINmom _ J Points - Jy Prereq 1 n 11 Credit l .i Building Reuse, Maintain Existing VV'alls, Floors & Roof -OEM mmnm� mom '===I won Construction Waste Management, Divert 50% C MEME Construction Waste Management, Divert 75% it credit3.1 Materials Reuse, Specify 5% C Credit,9.2 Materials Reuse, Specify 10% C Credlt4.1 Recycled Content, lo% C CMdlt4.2 v ode Credit5.1 Regional Materials, 10°/o C Credit{ ? Regional Materials, 0% C Credit Papidly Renewable Materials{ .5°o C Credit? Certified Wood, 5011/o redIt 7.2 Thermal Comfort, Verification credit B Daylight & vieI Da ylight 7 5°fin of Spaces 10 y 3T1 95014 WINmom _ J Points - Jy Prereq 1 n 11 Credit l .i Building Reuse, Maintain Existing VV'alls, Floors & Roof -OEM mmnm� mom '===I 3T1 95014 BRIGHTWORKS !_IS'TAIIVABILITY Materials WINmom _ J Points - Jy Prereq 1 n 11 Credit l .i Building Reuse, Maintain Existing VV'alls, Floors & Roof -OEM Credit 1.2 Building Meuse, Maintain 50% of Inte-rior Non -Structural Elements '===I Ci-edit2.1 Construction Waste Management, Divert 50% BRIGHTWORKS !_IS'TAIIVABILITY Materials P rereq 1 _ J Points - Jy Prereq 1 Storage & Collection of Recyclables 11 Credit l .i Building Reuse, Maintain Existing VV'alls, Floors & Roof U Credit 1.2 Building Meuse, Maintain 50% of Inte-rior Non -Structural Elements C Ci-edit2.1 Construction Waste Management, Divert 50% C Credit2.2 Construction Waste Management, Divert 75% it credit3.1 Materials Reuse, Specify 5% C Credit,9.2 Materials Reuse, Specify 10% C Credlt4.1 Recycled Content, lo% C CMdlt4.2 Recycled Content, 2_0% 0 Credit5.1 Regional Materials, 10°/o C Credit{ ? Regional Materials, 0% C Credit Papidly Renewable Materials{ .5°o C Credit? Certified Wood, 5011/o Project Zip Code tj P rereq 1 Minimum IAQ Performance Credit: PrerQq 2 Environmertarl Tobacco Smoke ETControl Credits .2 relit 1 Outdoor Air Delivery Monitoring SSc7.1 Credit2 Increased ventilation C Cred it3 A I Construction IAQ Management Plan, During Construction C Credit 3.2 Constructi on IAS! Management PI an, Befo re Occu pa ncy C: C redit.II I Low -Emitting Materials, Adhesives & Sealants C Credit4.2 Low -Emitting Materials, Paints & Coatings C Credit4.3 Low -Emitting Materials, Flooring Systems C Credito 4 Low -Emitting Material s, Composite Wood & Agrifiber Products il Credits Indoor Chemical & Pollutant Source Control J1 Credit 6.1 Controllability of Systems, Lighting Credit6 2 Controllability of Systems, Thermal Comfort Credlt7 1 Thermal Comfort, Design redIt 7.2 Thermal Comfort, Verification credit B Daylight & vieI Da ylight 7 5°fin of Spaces Credlt8.2 Daylight views, views for 90% of Spaces Project Zip Code tj Credit 1.1 Regional Credit: SSc4.1 Credits .2 Regional Credit: SSc7.1 Credit l 3 Regio ai C edit: WEc2 Credit 1 .z! Regional Credito WEc3 (40%) credit 1 .5 Regional Credit: EAc2 (1%) credit 1 L. Regional Credit: IElc.1 n/a n/a 4 Paints Possible LEED Scorecard - Certification Level Summary Brightworks is coordinating the sustainability strategies implementation and LEED certification for Apple Campus 2, Phase 2 Tantau 14 project. The following summary represents a snapshot of where the project stands with respects to LEED certification (Certified, Silver, Gold, Platinum). This project is expected to achieve LEED gold. LEED silver is a minimum requirement of the City of Cupertino. The charts provided summarize the credits that should be achievable for this project. The 'Yes' credits have been identified through the current design and team meetings, while the 'Mayve' credits (Probable Yes/No) are held back due to design development uncertainty. However, it is certain at this time that the Tantau 14 project will achieve LEED Silver certification at a minimum. -KEY i poinhl i - + Probable Nn PrDbable Yes i Y -BS I 100 90 PLAT I N Uri 80 70 GO LD 60 _SJ LVER 60 CERTI F I ED 40 ac General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All levels are in feet and inches unless noted otherwise. 4. All dimensions shall be verified on site before proceeding with the work. 5. Foster + Partners shall be notified in writing of any discrepancies. 6. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review F+P Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. Pruneridge Avenue Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title LEED Summary Project No. Date Scale at Arch E1 2193 01/31/2018 NTS Number Revision P-TA14-1.50 100 Site - Rfiasterplan THEATER VISITOR RECPETION PEDESTRIAN ACCESSIBLE WALKWAY OLIVE TREE GROVE PUBLIC UTILITY EASEMENT PUBLIC UTILITY EASEMENT PEDESTRIAN ACCESSIBLE WALKWAY PEDESTRIAN ACCESSIBLE WALKWAY EMPLOYEE BICYCLE PARKING 01 �_TA14-2 CITY BUS SHELTER EMPLOYEE BICYCLE PARKING PEDESTRIAN ACCESSIBLE WALKWAY PEDESTRIAN ACCESSIBLE WALKWAY )���� N O 0 1 Site Plan - Proposed 1" = 40'-0" PHASE 1 - MAIN SITE TANTAU DRIVEWAY UTILITY EASEMENT D LU Q Q H z Q O z 02 -TA 14-2. VISITOF F.> f— A1N0 11111� PRUNERIDGE AVENUE TESTING FACILITIES NORTH I oz W wQ uBBARp AVENUE H EMPLOYEE PARKING SECONDARY ENTRANCE (PRUNERIDGE AVE.) OUTLINE OF BELOW GRADE PARKING STRUCTURE, SHOWN DASHED MECHANICAL AIR INTAKE STRUCTURE #3 ON GRADE EMPLOYEE /VISITOR PARKING MECHANICAL AIR INTAKE STRUCTURE #2 PARKING EGRESS STAIR #1 APPLE SHUTTLE DROP—OFF / PICK—UP AREA (E) RESIDENTIAL CMU WALL TO REMAIN General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All levels are in feet and inches unless noted otherwise. 4. All dimensions shall be verified on site before proceeding with the work. 5. Foster + Partners shall be notified in writing of any discrepancies. 6. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning -Site & Architectural Review F+P Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. Pruneridge Avenue I I I I I I I _ _ I I - - I I I I = I � J m — a' M N z O PARKING EGRESS STAIR #2 Foster + Partners 1000 Samsome Street Suite 240 MECHANICAL AIR INTAKE STRUCTURE #1 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 ENCLOSED LOUVERED SERVICE YARD OLIN (16'-0" TALL) LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com RAMP TO BASEMENT PARKING OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com EMPLOYEE PARKING MAIN ENTRANCE (NORTH TANTAU AVE.) Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Site Plan Site B Proposed Project No. Date Scale at Arch E1 2193 01/31/2018 111=401-011 Number Revision P-TA14-2.20 00 h Ile ' — — -- — — ——-------------- PROPERTY LINE 15' STREET SIDE I SETBACK �QU 1<LIJm ' W I CV W OP,I' 88'-0" I I I I I I I I I 1 I I II � I I 1' 1 �I 1 I r- 1�= I OU 4 O J r-------- II B 00 L , II III �� L_ T NTAU 14 BUILDING III (2 STORIES) ' I I FF +161' ; TESTING FACILITIES NORTH I oz W wQ uBBARp AVENUE H EMPLOYEE PARKING SECONDARY ENTRANCE (PRUNERIDGE AVE.) OUTLINE OF BELOW GRADE PARKING STRUCTURE, SHOWN DASHED MECHANICAL AIR INTAKE STRUCTURE #3 ON GRADE EMPLOYEE /VISITOR PARKING MECHANICAL AIR INTAKE STRUCTURE #2 PARKING EGRESS STAIR #1 APPLE SHUTTLE DROP—OFF / PICK—UP AREA (E) RESIDENTIAL CMU WALL TO REMAIN General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All levels are in feet and inches unless noted otherwise. 4. All dimensions shall be verified on site before proceeding with the work. 5. Foster + Partners shall be notified in writing of any discrepancies. 6. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning -Site & Architectural Review F+P Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. Pruneridge Avenue I I I I I I I _ _ I I - - I I I I = I � J m — a' M N z O PARKING EGRESS STAIR #2 Foster + Partners 1000 Samsome Street Suite 240 MECHANICAL AIR INTAKE STRUCTURE #1 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 ENCLOSED LOUVERED SERVICE YARD OLIN (16'-0" TALL) LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com RAMP TO BASEMENT PARKING OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com EMPLOYEE PARKING MAIN ENTRANCE (NORTH TANTAU AVE.) Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Site Plan Site B Proposed Project No. Date Scale at Arch E1 2193 01/31/2018 111=401-011 Number Revision P-TA14-2.20 00 General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. r3. All levels are in feet and inches unless noted otherwise. W q 4. All dimensions shall be verified on site before proceeding with the work. 5. Foster + Partners shall be notified in writing of any discrepancies. z — �. 6. Any areas indicated on this sheet are approximate and indicative only. o � Q O Q a z Q VISITOR CENTER O z �A1N0 O VISITOR RECPETION FIRE HYDRANT SECONDARY FIRE ACCESS PRUNERIDGE AVENUE FROM PRUNERIDGE AVENUE PUBLIC SIDEWALK PARKING SEQUENCE EGRESS STAIRS ACCESSIBLE PATHWAY PARKING SEQUENCE EGRESS STAIRS ENCLOSED LOUVERED SERVICE YARD BELOW GRADE PARKING STRUCTURE, SHOWN DASHED FIRE ACCESS ACCESSIBLE PATH OF TRAVEL PROPERTY LINE 00 01/31/2018 Planning - Site & Architectural Review Rev. Date Reason For Issue PLANNING APPLICATION Key Plan. N O PIA Pruneridge Avenue F+P Chk Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Site Plan Site B Proposed Fire Access - Accessibility Project No. Date 2193 01/31/2018 Number P-TA14-2.21 Scale at Arch E1 1 " = 40'-0" Revision 00 W Y Y Y W Z U U U Z a a Q U) U) U) Lu- w O w w O ry ozf Of LL 117) c r � N Fn' HPI(' HT SFTRA(K WAY 1 01 Cross Site Section 1" = 20'-0" TOW 39' - 1" TOP 31'- 2 1/2" U/S SLAB 27'- 3 1/2" 16'-0" TOP 40'- 3 1/2" TOW 39' -1" TOP 31' - 2 1/2" —X– - - -- U/S SLAB 27'- 31/2" I �1 1%1-- nerd I 03 Mechanical Screen - Typical Detail 1/4" = 1'-0" TOW 38'- 9 1/2" OSI Mechanical Screen - Typical Detail 4 1/4" = 1'-0" W Y ry Y W Z U O U Z ao a m m [IfU) U) O o z O Z r Q I rll RACt-UAAIII-AI r7)CAITUf-%I ICC O n� 02 Longitudinal Site Section 1" = 30'-0" General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All levels are in feet and inches unless noted otherwise. 4. All dimensions shall be verified on site before proceeding with the work. 5. Foster + Partners shall be notified in writing of any discrepancies. 6. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review Rev. Date Reason For Issue PLANNING APPLICATION Key Plan. N O PIA Pruneridge Avenue F+P Chk Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Site Sections Project No. Date Scale at Arch E1 2193 01/31/2018 As indicated Number Revision P-TA14-2.30 100 � '• L _ � i' i i JAL•, i O�I Render- Pruneridge Avenue Looking East I 00 01/31/2018 Planning - Site & Architectural Review Rev. Date Reason For Issue PLANNING APPLICATION Key Plan. Pruneridge Avenue i i i i i i i i i i i i i i CD _ J a' M M F+P Chk N z O Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Perspective View Pruneridge Avenue Looking East Project No. Date Scale at Arch E1 2193 01/31/2018 NTS Number Revision P-TA14-2.41 100 Site m c 4�N J i I GCeey- ,i /> 1 000 1 r. � — � I �._._._._._._._._._._.i j — I i I 1 1 j I 1 1 i ® 1 1 lol- 1 Q ® I 1 1 i co i® I H•—•—.—•—.—•—.—•—�—■—■-1 �z i o I 1 1 i Ii i 1 j 1 I ! 1 ` 1 1 `•� PN0 i _ -g® _ - - - _ _ - -------------- J* -__--___-___-J* e venue �.� ----------------------- unbridg- ........ .- ........ .-....... --- ------ --- --- --- -.-.-.-.-.-.-.-- - db ❑ Tantau 4 10600 N. Tantau Ave Tantau 3 10590 - 10596 N. Tantau Ave i - i C 1 1 1 1 1 '1 � 1 — I 1 _ 1 _ 1 _.J 1 1 1 1 1 1 1 1 1 1 1 i i i i i i i I Pppn(i 1 1 Feet Minor Contour 5 Feet Minor Contour .` 1 1 1 1woo i ._ _ ■ • own i 1 1 • 1 ■ _ ■ _ ■ ■ _ ■ • _ • _ • _ • _ • _ • _ ,� • 1 1 • • _ 1 1 1 i ♦�• � 1 1 1 ■ 1 1 1 1 1 1 00 00ow 1 1 1 1 1 1 jj now 1 1 1 • —' 00 1 01/31/2018 Planning - Site & Architectural Review F+P Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. \ Pruneridge Avenue ... .... Q H N Iz� ■ . 1000,00000 •Foster + Partners / 1 1000 Samsome Street 1 Suite 240 \ / •�• San Francisco, CA 94111 T 408 610 5800 1 ,I• www.fosterandpartners.com ©Foster + Partners 2017 1 OLIN 1 •� LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Existing Topography Project No. Date Scale at Arch E1 2193 01 /31 /2018 1 " = 40'-0" Number Revision P—TA14-3.00 00 000 000 Doo DOD A + NntP� j '... •:' � � � j j 1. Surfaces shall be grade to provide positive drainage away from structures and buildings. 1 1 1 j Q ! ..... 2. Minimum slope at paved areas is typically 0.5%, i 1 ® and minimum at landscaped areas Is 1% unless � I i 4' I I subdrainage is provided. 1C 1 1 i �1N0 1 3. Maintain existing grade at all trees to be preserved. j ! ! Do not disturb grade withing dripline of trees o indicated unless otherwise noted. No equipment, Z I 1.- I 1 stockpiling, or debris may be stored within tree root T zone. 4. Preliminary earthwork studies with bank volumes 00 0 00 �•001 no soil bulking/shrinkage) will be provided at °!' ♦. ! formal submission: '`------ -- -- - --- —...........— • — • — • — • — ■ — • - ° 1 Earthworks calculations to follow .._................................................_._._.._._.........._......, ... ° I ... .. • ..' •' " ........ _ ------ ---------------- _ _ _ - - - - _ 5. Potential strategies to decrease the amount of .. ,-- -- 1 �- o ____ ________--------- material to be imported /off -hauled will be further studied during the detailed design process. — — �� > --- -------------. J` ----- ---------------------- I Pppn(i Pruneridge-Avenue ----------------------- 1 Feet Minor Contour °1 5 Feet Minor Contour El ° 1 0 �►,� ON�V r I 1 Feet Existing Minor Contour i 1 5 Feet Existing Minor Contour El 0 o j 1 ------ - ---- -- II r � O a a a a 1 0 1 1 '. o El a a a a � , El i �'. '• i ; II j 1 d o a ° o 0 o a ; ' —' ' —' Match existlin rade at :. e�cisting wa I t i remain tYp) 1 ° o a aEl , 1 ° T t ; F nL lit ; ; o o a a 1 II Propose�41 dement 1 ° outline 1 I 1 1 1 1 ' ON[V O O a a 1eeme , •�■�•� m— 1 o ; El El ; 1 1 CU Tan ° ° ark ng+� uctu ; ! : • 1 • fir► oa ❑MEN, ■—. —. �.—■ •►•�■� 1 1 I .. a O0 OU El a Match existing ' d t I o ° rec ntl G ns r baCK of sidoewa k I'. :I a �a I F�nLtg911A a a ul>•lls lomumol I11F _goo 900 1 1 1 00 ■ 1 1 1 1 ■ . i �. ,e0e- 00 00 oposed Gr, i 00 01/31/2018 Planning - Site & Architectural Review F+P Rev. Date I Reason For Issue Chk PLANNING APPLICATION Key Plan. \ Pruneridge Avenue e N z O it Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Proposed Grading Plan Project No. Date Scale at Arch E1 2193 01/31/2018 111=401-011 Number Revision P-TA14-3.10 100 I 1 1 1 I 1 1 1 i ,17 1 1 1 1 - CU DOD �92G CU I J0, 1 1 1 z 00 1 i I •., aft a loom. lool. i 1 E I ° 1 I � ce-re Iss.n IL I J I — — — — — — — — — — — — — — — — — — °1 I I o I All. I I °• — — --------------------- o— — ---------- 0 o• / , - ------------ o• _ r_ l �sarcr`- - -ISI'= g ------ �/1 \ [W11----—- - _ _ Prunerid a Avenue C SDMH-RIM 156,68 SDMH-RIM 157,18) / _ _ _ _ _ — — — — — — — -- — — — — — — — — — INV 151.23 12^ 1/IN-g INV 150.5] 12 IN�1 V•148]111YpIWr- — — — — — — — — — — — _— — — — — — — — — — iNV 151.16 I}' fIN-N) WV 149.79 IS^ V 150.31 30^ N -E Wt E) WV Id9.3] ]0^ V 4897 i3^ N - INV 14929 ll^ E) pi - °1 ___mille loft of ::� -- A IN ID .1 I I �AdYYI► INV I 12^ -E o II i 1 ❑ W o o II 1 1 I � ° -IC 156.52 ° O a a a a -419 — ElEl1.1S^DI-MM4 166.32 510 N NV 511 62 0iN 0N1Y O- ❑ I'I,I - 1 1 E °I o a a O OEl II II 1 I , DEl I 1 I . - ❑ I 1 ' I I o o a a j 1 I II 1 El O aa /II - 0 ° Tantau 14 II 1 1 I D II I 1 o a a a 0El 1 I '❑ o _____ _______ _____ I 1 ° �o o a a I 1 ONLY � El I o a a a a ElEl - N I J 1 �1 O _____ _�_ > _�_ _____ II I Q a O II - ♦� =3 II 1 CU I II i 1 CU I �i na ? II ii Park ng+� ucture I I� a a / / / . _ . Mee, . _ . _ ■ Mee . - NntP� 1. Capacity of the existing systems at points of connection to be confirmed. 2. Preliminary storm drainage layout shows major pipe network, details such as pipe sizes, invert elevations, manholes, etc to be determined. 3. Stormwater quality Best Management Practices BMP's) will be designed in accordance with City of Cupertino requirements and the Santa Clara Valley Urban Runoff Pollution Prevention Program NPDES permit (C.3). 4. BMP's are illustratively shown with areas approximately 4% of the contributing impervious watershed. Treatment areas are shown illustratively, pending coordination with landscape design to be determined. I t-pp'nd Proposed Storm Drain Potential stormwater quality treatment/conveyance area _____ _______ 1 O O EJ) 1 1 1 I El ' 1 1 IEl El 0 0 OU Tantau 14 a- ---- - -o- ----- - E�i- i 1 aur -E El slop �♦ 1► I I I O a a a a ' ' �♦�■ El I O • 00• 00 O ' ■ 1 .'♦♦ 00 _ 1 ,. € ° 1 _ o O O O O 1 �• I 1 I I�El 0 1 d 0 ♦� ■ El O O a aEl ' El Io 0 El o %2 a a a E I A0 I El ElElo • El El El El El El El El El 4' Uee\1- %� 0 El El ° o El ° El ° 1 I o / / 'j �♦ , vi W rnu .,00- 00 ♦ 00 i. ♦` \ pi -R14 160.a3 ♦ ♦, , INV ��_5].3].a 12' l 12 (IN -s I ` 40 ♦' ♦ � //// :HV 11 I I . , ♦,•'�400*0 400 \ ♦i' I TZM ° I ' ° I ♦ o I •� O ° ' • ' • • \ I ` ° 1 ° W K ° 52,41 ,,4 I W 00 01/31/2018 Planning - Site & Architectural Review F+P Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. \ Pruneridge Avenue a� 1 N z O Pit Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Proposed Storm Water Control Project No. Date Scale at Arch E1 2193 01/31/2018 1 " = 40'-0" Number Revision P-TA14-3.30 100 Q cB F, i IS6.n I CU `b y�INv / IS WIruE � I GCee\` J I z I T -.00 i i I I I CO I I _ I I _ w•� zz� 4' Uee\1- %� 0 El El ° o El ° El ° 1 I o / / 'j �♦ , vi W rnu .,00- 00 ♦ 00 i. ♦` \ pi -R14 160.a3 ♦ ♦, , INV ��_5].3].a 12' l 12 (IN -s I ` 40 ♦' ♦ � //// :HV 11 I I . , ♦,•'�400*0 400 \ ♦i' I TZM ° I ' ° I ♦ o I •� O ° ' • ' • • \ I ` ° 1 ° W K ° 52,41 ,,4 I W 00 01/31/2018 Planning - Site & Architectural Review F+P Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. \ Pruneridge Avenue a� 1 N z O Pit Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Proposed Storm Water Control Project No. Date Scale at Arch E1 2193 01/31/2018 1 " = 40'-0" Number Revision P-TA14-3.30 100 Planting type per landsape architect Cleanout with cap at finished grade. See Note 4 Variable side slope 3:1 max. 4" min diameter approved cobble (grouted in place) for min distancE of 2' either side of inlet. Place geotextile between cobbles and soil for erosion control. Inlet 1:1 Side slope Native soil 2" min To storm drain Jo tree planting in this trea. Radius of treeless irea to be determined )ased on tree species Planted. Perforated overflow pipe Slope of main bioretention area not to exceed 2% Freeboard depth varies (min 3") Ponding depth 12" Overflow riser at max 100 feet spacings. Trash screen per Detail 08. �I Waterproof lining required �I where bioretention area is within 10 feet of structure 3" stone or mulch 18" min filter media planting soil mix per landscape architect 2" min pea gravel 12" min drain rock. '--1:1 side slope Note 1 0.5% min 1. Overflow risers shall be included per Biorention Area Detail 01. Omitted for clarity. To Underdrain, connected storm Bioretention Swale drain to storm drain 05NTS Standpipe Cleanout with cap at finish grade. Min 18" depth filter medium planting soil mix per landscape architect 12" depth drainage rock 8" 4" 1010 "'Ri_�`�Fi� lll'�'A'•,i' Overflow riser at max 1 00f spacings. 12" above low point of planting area. Trash screen per Detail 08. ' Concrete structural planter wall with waterproof membrane Connect to storm drain 'Underdrain, connected to storm drain. Place just above base of Note planter 1. The underdrain shall consist of a minimum 4" diameter perforated pipe connecting to a storm drain or discharge point. Minimum two rows of perforations shall be provided. Underdrains shall be placed with perforations facing downward, at a minimum 0.5% slope toward the storm drain or discharge point. 2. To avoid clogging, filter fabric should not be used in or around the underdrain or between the filter media planting soil mix and the drain rock. 3. A cleanout shall be provided for underdrains, consisting of a vertical, rigid, non- perforated HDPE pipe ( min 4") with a water tight cap fit flush with the biotreatment soil surface. 4. Grouted rip rap apron to be provided at connections to buildings and at curb cuts. 04 Flow through planter NTS Bottom width 6ft 3:1 side slopes (typ.) 1 ft (typ.) = Y V Build-up per Bioretention Area, Detail 01 Subgrade Vegetated ground cover UUO"U U = UOVO U U �L U U 0- -0 UU-i U UUUU 1000000000000000 0000000000000 000000000000000 00000000000000 QQ90000000000 onnoonnod Underdrains (including cleanouts) per Bioretention Area, Detail 01 Notes 1. The underdrain shall consist of a minimum 4" diameter perforated pipe connecting to a storm drain or discharge point. Minimum two rows of perforation shall be provided. Underdrains shall be placed with perforations facing downward, at a minimum 0.5% slope toward the storm drain or discharge point. 2. To avoid clogging, filter fabric should not be used in or around the underdrain or between the filter media planting soil mix and the drain rock. 3. A cleanout shall be provided for underdrains, consisting of a vertical, rigid, non- perforated HDPE pipe (min 4") with a water tight cap fit flush with the biotreatment soil surface. 4. If waterproof lining is included, underdrains should be placed just above the waterproof fabric. Otherwise underdrains should be installed at least 6" above the base of the trench. Standard t Concrete curb & Curb cut - drain Street paving 18" min filter me planting soil mix per landscape architect 01 Bioretention Area NTS Planting Overflow drain with mesh insert Sidewalk paving Mulch Drain mat and waterproofing and filter fabric, typ. Subgrade Connect to storm drain 02 Bioretention Tree Planter NTS Swales typically have - shallow longitudinal slope (0.1 % - 0.5% typ) Height 2' to 6' 3:1 max. side slope Soil per landscape architect Underdrain, min 4" perforated pipe connected to storm drain. Pipe surround min 6" drain rock. 06 Overflow Conveyance Swale for Large Rainfall Events NTS Swales typically have shallow IoRoi tudinal slope (0.1 % - 0.typ) 3:1 max. side slope Soil per landscape architect 07Conveyance Swale NTS 6' bottom width (typ.) Vegetated ground cover 10' bottom width typical (20' to 40' top width) Overflow riser with grate. 12" x 12" drain box at 100 feet centers. Vegetated ground cover 00 01/31/2018Planning Site & Architectural Review F+P Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan Q M N O Pruneridge Avenue Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Stormwater Quality BMP Typical Details Project No. Date Scale at Arch E1 2193 01 /31 /2018 NTS Number Revision P-TA14-3.31 00 Overflow riser at max 1 00f spacings. 12" above low point of planting area. Trash screen per Detail 08. ' Concrete structural planter wall with waterproof membrane Connect to storm drain 'Underdrain, connected to storm drain. Place just above base of Note planter 1. The underdrain shall consist of a minimum 4" diameter perforated pipe connecting to a storm drain or discharge point. Minimum two rows of perforations shall be provided. Underdrains shall be placed with perforations facing downward, at a minimum 0.5% slope toward the storm drain or discharge point. 2. To avoid clogging, filter fabric should not be used in or around the underdrain or between the filter media planting soil mix and the drain rock. 3. A cleanout shall be provided for underdrains, consisting of a vertical, rigid, non- perforated HDPE pipe ( min 4") with a water tight cap fit flush with the biotreatment soil surface. 4. Grouted rip rap apron to be provided at connections to buildings and at curb cuts. 04 Flow through planter NTS Bottom width 6ft 3:1 side slopes (typ.) 1 ft (typ.) = Y V Build-up per Bioretention Area, Detail 01 Subgrade Vegetated ground cover UUO"U U = UOVO U U �L U U 0- -0 UU-i U UUUU 1000000000000000 0000000000000 000000000000000 00000000000000 QQ90000000000 onnoonnod Underdrains (including cleanouts) per Bioretention Area, Detail 01 Notes 1. The underdrain shall consist of a minimum 4" diameter perforated pipe connecting to a storm drain or discharge point. Minimum two rows of perforation shall be provided. Underdrains shall be placed with perforations facing downward, at a minimum 0.5% slope toward the storm drain or discharge point. 2. To avoid clogging, filter fabric should not be used in or around the underdrain or between the filter media planting soil mix and the drain rock. 3. A cleanout shall be provided for underdrains, consisting of a vertical, rigid, non- perforated HDPE pipe (min 4") with a water tight cap fit flush with the biotreatment soil surface. 4. If waterproof lining is included, underdrains should be placed just above the waterproof fabric. Otherwise underdrains should be installed at least 6" above the base of the trench. Standard t Concrete curb & Curb cut - drain Street paving 18" min filter me planting soil mix per landscape architect 01 Bioretention Area NTS Planting Overflow drain with mesh insert Sidewalk paving Mulch Drain mat and waterproofing and filter fabric, typ. Subgrade Connect to storm drain 02 Bioretention Tree Planter NTS Swales typically have - shallow longitudinal slope (0.1 % - 0.5% typ) Height 2' to 6' 3:1 max. side slope Soil per landscape architect Underdrain, min 4" perforated pipe connected to storm drain. Pipe surround min 6" drain rock. 06 Overflow Conveyance Swale for Large Rainfall Events NTS Swales typically have shallow IoRoi tudinal slope (0.1 % - 0.typ) 3:1 max. side slope Soil per landscape architect 07Conveyance Swale NTS 6' bottom width (typ.) Vegetated ground cover 10' bottom width typical (20' to 40' top width) Overflow riser with grate. 12" x 12" drain box at 100 feet centers. Vegetated ground cover 00 01/31/2018Planning Site & Architectural Review F+P Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan Q M N O Pruneridge Avenue Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Stormwater Quality BMP Typical Details Project No. Date Scale at Arch E1 2193 01 /31 /2018 NTS Number Revision P-TA14-3.31 00 � 1 I 1 I 1 1 1 1 ; I 1 1 1 P.U.E.-PARCEL l_ ® I 1 1 1 (7757 O.R. 626) 1 ® I H._._._._._._._._._."1 1 10 1 I 1 1 1 — �— '- PgPnrl 'X1 1 Water/Fire Service LINI�._._._._._._._._._._._._._._._._._._._.� _._._._._._.j ._._._._._._._._.�.� �•.._._._._._._._._._._._._ _._._._.—Sanitary Sewer _._._._._._._._._._. sesl c fl ° 1 _......._._.... ....__...... G a s z 1 5 Q -- - - - - - - - --- - - - - -- - Electrical i ► o ------------- --------- - j Fiber Optic/Telecomm ° 1 = 1 " z o = Storm Drainage –------------ - °1/ _ e ---------------------- is °1 - ---------------------- ... R...........■R■....R.........,..■.........................■.....R....... 1 _ .....--------------....._._. 1 _.� ■_. av .� EL METER °• S 1 ` ' . 7 77-1) r uLr 1 11 I I N ( i 77-1) jI I I o - e 7.50' P.U.E. �. Sr •----------- 1 1 1 (879 M 19-25)El ` 0 1 is V TL ! 15.50' P &E EASEMEr ° - - (Cl 10 O.R. 1 3) Iw■ ( oc o. 1 Z 1 B 1 1 3 Tantau 4 - ° i _ ■ ■ _ ■ +�- v El }) G&E EASEMENT 1 1 0470D.R.441' .6 o e � – 1 1 )� f j 1 - Electrica - i 1 – 1 i le • _ • _ • 00 01/31/2018 Planning - Site & Architectural Review F+P -C i ■ _ ■ _ • _ ■ _ • _ Rev. Date Reason For Issue Chk 1 1 "Storm Drain1 - '� PLANNING APPLICATION 3 � 1 anitary Sewer -—'—'—'—'—'—'—'—'—'—'� � •—•�' • _ , _ �' Key Plan. ater 1 �. _._•_•_'�■ Pruneridge Avenue as 1 Apple i er 1 1111 0 1 � = Apple Fiber _ _ _ _ _ 1 _•_._•__•_, 1 1 1 1 1 1 ; ; ... so - 00 j " i 1 1 1 1 • E 1111] 1 1 I • . • 1 ■ c 1 1is 0 f 1 > �- _•_. Q ,).■ is Y •_• 1 1 1 1 _ �� 1 1 sow M � O z 1 1 _• 3 , • '. �. c € , •. 00 Foster + Partners x. Ld S° Tantau 3 1 ` 1000 Samsome Street Suite 240 1 ° •�' San Francisco, CA 94111 sell T 408 610 5800 ,,, ,I• www.fosterandpartners.com © Foster+ Partners 2017 LANDSCAPE OLIN ARCHITECTUREAND URBAN DESIGN / Public Ledger Building, Suite 1123 5 150 South Independence Mall West Philadelphia, PA 19106 = T 215 440 0030 / Fax 215 440 0041 o ; www.theolinstudion.com OLIN Partnership. Ltd 00 _ :' �♦ `• _ Luk and Associates i = / .- ° �• _. ■ �' 738 Alfred Nobel Drive �' � • _ . � • �' Hercules, CA 94547 ° •I' , ♦ �. s' T 510 724 3388 �\ www.lukassociates.com ,♦ ` 00 1 \ \ '• ` . ' o '/i, I• 1 �� ♦ '� $00 ♦ •so 1 �. �•� 5 1 1 ` It �. ♦I i j - _.._,.____.....__..--A-___.......,.,. 1 00, veva ♦ ,' ,♦ Client i..._... ........ .� :- EV � 11118 ' ♦ •.•�' Apple Inc. 2is .- 1 �•� \ is 1 ♦' i Project .�,•. ; Tantau 14 Building ON[V ORY ��� °m: j ,•' Apple Park 0 0 - , Phase 2 i 1 011 °,�, - Title o u � j 100 Plan Existing Utilities a ; Plan / I I 0' EMENT- O / i 0 N � 33 O � ♦ ■ 1 • Project No. Date Scale at Arch E1 J1 Existing Utilities Plan = _ a w o ! 2193 01/31/2018 1" = 40'-0" 9 111= 40'4"sell — p 1 •' �.� = I _ _ V � j ; Number Revision P-TA14-3.40 00 - a N O iii ••• '• � � I� • 1 1 m vau Connect 1 existings drainae ,onnect to xisting water ervices Connect to xistin Apple fiber vult • O I II I I I v �_' I . I I I � I j I'Ijl� ! =1 ' 1 1 I �I 1 1 1 1 j ; 1 >1 I I 1 IIII-Ib -`�_■�■_■_■—■_._■—■—■-- I IT, j 1 I \ ■ I• � I � I I I it j`I i ' ' 1 1 1 I �,�. NJ /\LINO Y 1 ' �.+�. I , --------------- ----------- A •♦ ❑�� 7 - - exrsti -water line T MiT Ocr 11-L _ _ _ = a = — — b _ _ _ _ _ s z = _ — _ _ _ _ ' ............ .......... h 1 T ' 1 a j e$ I ctstorm Id ina e -------------- -----------------------' --------- ti2'.---_-----_ _ _ _ _ _ _ _ _-----y�-�c«I---- ° � I � 7 I I I Wit �;1 I I 1 �� IT D<r� -��reridgenect-to-exlstl % 1 I�I_ III Avenue � I ----��-''L'�`r�----�_ _ _ - IIII salnitary sewer lin z I _ w I - -------------------- - - - - - - - - - - - - - - 1 1 I _ I ° — I q'� — — — — ....... _......... .......... _...... . Notes 1. Capacity of the existing utility systems at points of connection to be confirmed. 2. Existing fire hydrants around site perimeter will remain In place as possible per site plan. 3. Unless external agencies or site conditions require otherwise, vaults, boxes, etc. shall typically be flush to finish grade aligned and set parallel to adjacent joints, curbs, etc. Legend ♦Water/Fire Service � --- I° 1 1 0 1 I I I IY It 1 O `♦ EL ■E,ER —— — — — — — — — — — — 9NOV TM T 77 � g I I --_ --1 - - - -�� 0 1 - C P-1 Z1. -I y iI II r �-------------- --- , I I II�II� I I EI O O I III 'N /' I O q d O ; (] ; ❑ 1 j 1 III ■} -._ o � - -1 W ■ I 1 , I - ❑ !e I� 'El all ID , I ; ■ a a a a ; ®, ' • 1 I I II vl I I+r ° j o D I I � �- - -I I I O a O IIII I 1 , I II �' 1 ❑ , ' i_■ ■�■_-.-_■�■_■! Parkin lot li htin w I1 comply ' I o ° ° a ° ' with tM stangdards O? the D 1 I I 1 ; 1 ; o ; parking ordinance 'ElTantau 14 1 0 1 ! I I 1 O ' 1 1 ................... I11 'III 1 /I II ' -J❑ o ' ----- O� ------------ ----- q 1 I � 1 , - O , I I I I ' I�■ � I, I , , I I El 0 1 1 � a a I q a I I, I I El I 1 II C:I El 1 Q' I -I --------- 1 ! I _ 0---- 11,11 ICU -k 1 �3 III 1 7 1— I II o1 1 n a a a Park ngC I ucture ; a ! Sanitary Sewer - Gas Electrical Fiber Optic/Telecomm Storm Drainage ..... Existing Water /Fire Service S-anitary Sewer -------- Existing Gas Existing Electrical Existing Fiber Optic/Telecomm . . . . . . . . . ` Existing Storm Drainage / I' II I I II 1 I ° ■ I .�■� 1 • H -I- - - -- ----- -FRI- -Q- ----- �—T •_•�•�■_■_ ■ 1 1 i UP' DU t�vj - - - I •_ 1 Connect to existing , I _' r O ° , o 1 1 1 1 sanitary sewer lin — 1 'll �,1, a 1 � II• � I 1 1 1 1 I I I Y5111 SL8 O a a ; 1 1 • �•� i Connect to ' Tantau 14 ' existing storm 4--? I II I , I � - - - - -- Imo- ---- -�- � i 1 1 ■ drainage I 1 � 1 1 0 0 0 0 ' ■�•_.� I I 1 I I I I O 1 , •�• QEl '•�• 00 IA I - i 1 I � , —r , I � 1 1 , II 010 ' ' • II --- ----- I I I I -- -- 10 1 ,r 1 °1 ; I I I ; �1 ;3E] O O O O , ° I Perkin lot li hti _itlV'�I comply t I with th stngdar� o the parking ordinance O El SII i I I a a a a ; 1 -- - - - -- - '� �op sed n. . � '� � I q III I II � transTormer II I I o O O O a LAJ �. FI I>t I � I II I�1N0 I I % 100,>I I I O ElWr Mil isting— -pctica O I I III T , I I E O a 0 O ,• O O Connect to I I I I 1 existin ga 1 El -� 0 I O El ♦�, ° O I° 1I El ---------------- ---- - - -Ell El O L El El El El El [oil El El �1 I. I I I I I � •♦ ,• a) 1 -, - Gee ♦,♦ �. •♦• ■ II ; I ; ONLY O's ,♦•♦• � �•�� � 1 1 I l7L�a .♦ / a - I i - III cU 11 0 0 GCee� G II I ° I O L --J ° •♦� �� II o •♦ I U I ,1-1783 2P ... ... . tj •I N � iYl 1 i �,� ° • ` .00 wfr_ tY � ,- - -� 1Ycf I ,-7 - ° ■ PM s.-E2oe I I I I I I I 21- SW -11116 0 00 01/31/2018 Planning - Site & Architectural Review F+P Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. \ Pruneridge Avenue 11 N z O Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Proposed Utilities Plan Project No. Date Scale at Arch E1 2193 01/31/2018 1 11 = 40'-011 Number Revision P-TA14-3.50 00 Site - Landscape General Notes 1. Do not scale drawings. Dimensions govern. v v v M Mt a 2. All dimensions are in feet and inches unless noted otherwise. I I O O O O O UEl 3. All dimensions shall be verified on site before proceeding Q with the work. • O� \ o F LEGEND EGEND 4. OLIN shall be notified in writing of any discrepancies. ° - 5. Any areas indicated on this sheet are approximate and I� v 0 0 indicative only. a U I- - � a o •' 000 0 • = ° — — PROPERTY LINE O 00 SETBACK LINE O O OII— _., o II I II II 0 = '� I� WELDED WIRE MESH FENCE • 0 o o O O O O O O O O 0 o O t ;•� ^1Nu � EXISTING TREE O O O O O O O O O O O 0 ° ° ° JT41 O O DBHTAG# TREE IDENTIFIER O .o 0 �O PRUNERIDGE AVENUE ° 0 0 _ _ _-—————— — — — ——— o 0 ° ° ° ° ° ° ° ° ° 00 0 O o • °I . / � — 3S ,s.��°k -- 35S � 00 — — ° • 66 O 0 ° 0 \- 0---_\ _ L 9 Q �' t U 239 m \ v 60 • _ 10.4 O • iii ° ° 0 I iii 0 i sig 62 O 0(:D I of • iii 2 0 O O �I 125 Li 65 o 112 I 67 O� ` 8 ' 5 3 9 O � 0 ° x — 00 3 72 25 - 5 00 01/31/2018 Planning -Site & Architectural Review DB 76 II Rev. Date Reason For Issue Chk 38 PLANNING APPLICATION 79 115 Key Plan. O I� 80 30 Pruneridge Avenue r, 81 O • 14 O • O 4 0 0 z 1 83 � 0 O 3184 I f � o I � ° o O0 ° n w _ 687 O 0 Z 88 ° ° w 89 CU 0 0 o Q j 3 91 N z i O v 92 93 O O ° 0x Foster + Partners 0 96 ° 0 0 Z 3 5 1000 Samsome Street 0 3 97 Suite 240 San Francisco, CA 94111 0 ° 00 o' 0 98 / O O T 408 610 5800 www.fosterandpartners.com 99 © Foster + Partners 2017 O OLIN 0 L 00 LANDSCAPE ARCHITECTURE AND RBAN DESIGN SCU 0 3 1 i Ledger Building, 12 Publ c ed eSuite 1 3 0 9 ° C 01 150 South Independence Mall West 000 6.5 px Philadelphia, PA 19106 • 0 0 ° 02 p O 13 T 215 440 0030 /Fax 215 440 0041 3 3 www.theolinstudion.com 00 4 OLIN Partnership. Ltd O O 5 00 3606 Luk and Associates 0 18.7 ° 738 Alfred Nobel Drive • 0 -- I 25 Hercules, CA 94547 • T 510 724 3388 f • 0 www.lukassociates.com OLLr 00, ` 36 7 / 00 ° O 0 O — O O -- O ii 4 = / _ - A o -- 01 O O r Client I�� O� Apple Inc. O CREEK o �`O O O �i � o° 0 O � ACCESS � 0����� � . O O GATE s Oll00000 00 Project O4(73 Tantau 14 Building O Apple Park -- O = �' Phase 2 O00 ®® Title Existing Tree Plan O N Existing Tree Plan Project No. Date Sca"atArchE; — " 01 1" = 40'-0" 1738 01/31/2018 1 — 40 0 0 20' 40' 80' Number Revision P-TA14-4.00 on N O 0( O DOE off �j 01 Proposed Tree Disposition Plan 1" = 40'-0" 0 0 0 Ch c.� x1J 0 CC) 000 00 � f> 4- PRUNERIDGE AVENUE O h1Nu' I- 1� J 0 0 3551 ------ - - - - WZ I = 3561 k *211 411 62 I � �� o�� ,__ � , •1 63 - - I U 364 ' .5.. u 65 .211 I i 67 ' �8 .� 770 � I _ 72 3 76 - • 1 .89 I � •581 1 82 83 84 3 87 - 88 89 90 . 51 3 92 193 96 98 LEGEND - - PROPERTY LINE SETBACK LINE WELDED WIRE MESH FENCE L EXISTING TREE TAG# EXISTING TREE TO BE DBH REMOVED Total Existing Trees: 43 Existing Trees to be Removed: 43 Existing Trees to Remain: 0 Existing Trees to be Transplanted 0 General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All dimensions shall be verified on site before proceeding with the work. 4. OLIN shall be notified in writing of any discrepancies. 5. Any areas indicated on this sheet are approximate and indicative only. 00 1 01/31/2018 Planning - Site & Architectural Review DB Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. Pruneridge Avenue I F N1 1 Q CU N z O Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com s Client Apple Inc. �CIO, A n� . I Project 10* Tantau 14 Building Apple Park Phase 2 I Title - Proposed Tree Disposition Plan 0 20' 40' 80' Project No. Date Scale at Arch E1 1738 01/31/2018 111=401-011 Number Revision P -TA -14-4.10 00 Total Phase 1 Phase 1 - Phase 2 - Phase 2 - AC2 Overall Project Tree Quantity Site A Site B Site C+D Summary Quantity (including Quantity Quantity Quantity Site A) Standard Trees to Remain 740 Trees 614 Trees 47 Trees 0 Trees 126 Trees Specimen Trees to Remain 01 Trees 0 Trees 0 Trees 0 Trees 1 Trees Standard Trees to be Transplanted 73 Trees 68 Trees 0 Trees 0 Trees 5 Trees � Specimen Trees to be Transplanted 18 Trees 17 Trees 0 Trees 0 Trees 1 Trees Standard Trees to Be Removed 3,625 Trees 3,280 Trees 58 Trees 69 Trees 276 Trees Specimen Trees to Be Removed 49 Trees 49 Trees 0 Trees 0 Trees 0 Trees Total Existing Trees 4,506 Trees 4,030 Trees 105 Trees 69 Trees 407 Trees 1 Total Existing Trees to be Removed 3,674 Trees 3,329 Trees 58 Trees 69 Trees 276 Trees Legend ' I Existing Specimen Tree To Remain i 1 #### i 1 Per EIR - October 2013 - - 1 1 1 1 1 Existing Specimen Tree To Be Removed _–.– 1 ! •� 1 Per E I R - October 2013 ! i 1 1 1 1 ! '� 1 i i 1 Existing Specimen Tree To Be Transplanted Per EIR - October 201325 i 1 i ❑ 1 Existing Standard Tree To Remain 1 i 1 a 0 o a o LJ1 1 0 ❑ ° 11 Per EIR - October 2013 Existing Standard Tree to be Transplanted 7 i COY) 1 L - - - - - - - - - Per EIR - October 2013 Z3 L - ai d • — o -- Existing Standard Tree To Be Removed o z _ . a.. .. r• _ -- ------ -- o- r a . a • ___ --.-- - - - - - - - - - - - g ' �———————— — — — — —— r r r East Homes_ea�-_Qar-- _ Per EIR -October 2013 =' --_-------—— — — — — —— _ —*r 9 1 j t ._■_._■_■ 7L \�S2Stead�9ad —---------------- @ad--------------- —— --- - - Roa`d s -East-H +load---— ----------- _ '-p '� '_,_,_,_,_,–■–•– Existing Standard/Specimen Tree To Remain #### / - _ _ __ 64 ----_-_-- -- ____------ p ------- 3040 ROM--- -- _ b .111111110 M -3m-r 11vul cum, 14 f# Per Current Design - September 2017 • I I 1 0 1 �qg 3039 3 3 3029 1 3Cq(515 X11® • 3006 2322 2318 2312 2310 • 2993 a g p 4 633— 059 05 054 3035 • 3031 • 18016 • §916 2274 • 3009 2314 Y 3067 3045 3042 2092 3030 • • 2278" 33MU 0 2 8 • 0 _ ExistingStandard/Specimen ecimen Tree to be Transplanted �' 5s 3055 069 • • 2284230D991� KA p p # • 3044 • 3043 2323 2319 2317 2315 2313 9 0 68 1860 1861 1862 1876 1877 1878 1909 • 191 1935 202 2028 W269 2283 2302304 0 298 oKr ■ Per Current Design - September 2017 7j� • 0833 • 910 ) • 1994 •1995 025 2280 2290 2292 2294 6 i36 1 1993 2070 2090 2270 2 2276 2 • • • • 2288 • • 000 7 2299 1 Existing Standard/Specimen ecimen Tree To Be Removed 7j N1831 5 1879 1 8 1T.- • 49 50 •1961 •1962 1975 1976 • • 1996 • 2281 2287 •2289 2291 2296 •• 023002301 « 4 g p • # 370 • 1 : 18 9 1881 • 1882 2293 • 98 2971 2970 �'� • • 2271 2279 2282 Per Current Design - September 2017 Xf Jla 307 ! 1834 58 1 187 91 ^ • 1936 1951 1963 1977 •1992 •2022 2029 • 2071 0 2093 2266 2264 2262 2260 •2258 2257 2325 2327 2330 2332 2334 1 •� 5372 71 X18271' • • 90 • 1991 1997 2066 2073 • • 2267 • • • • • • • • •324• • • 29 • • • 2336• • 2 • 2342 2 i 27 94 1960 0 2021 • 0 094 2256 • •`' . — `� 18 1 1 1 • • • 1974 • 1 • 1998 • 2065 2074 W to 2331 2335 _ � � � a'�� 2251 2252 2254 2 • 2337 2340 • 2344 2�1 29 2 1 O 307 1825 :1 • • 0 1999 • • 0 2255 • 2 8 2357 3 2351 2350 23 • 2345 2983 1 8 • �� 1824 • 1952 1964 • 1978 • 89 2020 • 2064 2 09 • r� 2253 2360 2356 2355 30 9 • 2000 • p D 2247 pryy • • 59 •• • • 23 • • • • 2346 296 1 c 73 h + 08 30 1 837• 18 1 1947 1959 1973 • 2001 • 2019 063 2076 2243 22 361 2354 • 2349 • 296 • • • 1988 f3 4 2 1823 • 1838 1g 19 2018 1 • 236 2372 2376 2378 2382 2386 3383 7 - I 308 • 1906 19 8 1946 1958 1965 1972 1987 • 2087 • 2097 01000 0 g 2396 296 • 81 1 084 182 83 • 1872 1927 • • • • 1979 • • 2002 • 2017 390 33 0102397 • • 1 5375 R 203 • • 2077 231 3 • • • • • •• • • 3385 296 S76 M 821 1844 ............. 1896.................. 1926 •1939 1945 •1953 1957 1966 1971 1986 • 2003 • 201 •2078 0 2098 27 2229 2230.22 2 • • 6 367 2371 2375 2379 2383 • • • 2398 • • g1 296 • 0 t._._._ 7 • 1820 1840 • • • • • • 2387 2391 29 1 1813 1819 &43 • 1985 2034 • 2061 • • 208 • 3 • 2399 3382 • 80 • 79 5377 1 1897 1905 1925 1 - 3087 0 7 1871 1 1904 • 1940 • 1 1954 • 1956 1967 70 1980 2214 • 2400 29 0 8 4 r� 5378 1 1 5 79 89 1814 1810 18 1� • O • • 20 X14 • . 2213 2212 • 2401 • 79 2 g 0 2977 1 LL i 01870 go• 1901 1903 19 1 1923 1941 1 1982 084 • 77 2 58 1 5380 392 090 30 1815 •17 • • 1969 19 2036 35 • 2101 2223 • 3089 1800 1899 �• 55 05 2 • 2102 102402 • 5 y - o o 5 81 • 1 53� 092 X099 • 9 9 • 190 • 43 • 1968 • 2083 2119 2122 2125 22 0 102403 3374 0 �/• 29,874 1 5 83 • 201 • 2053 0 2103 • 9212409 •.2127 2 0 N 2405 • 33� 510 2956 1 e i 5 094 3 5 ® 2008 �10 042 • 2052 2126 240 • 2406 3 96 801 1 5386 5 85 309 O� 40 • 20 21 • 220 562 256 • 2409 24 955• 2955 • 1 i 5 87 096 3 • • 2115 g 2205 558 1 255 q 2410 • 2411 2426 45• 38 0 205 554 2 8 24 412 2424 • 1 y 5388 �� 7 1802 o f�� 3 98 • 2039 2111 • / 24 27 2429 1 389 044 210• • • • 2135 • • �� • 25 9 54 54 7 2 2 2 0 • 2• 3 2431 2 2• 0 4 2045 5390 3100 1 • 1796 46 2110 • • �� 2569 5* #4 2546 241 241 2421 • 2430 3360w. 6 1 ! 5 91 3102 1803 2 36 2144 • 150 2202 2570 2432 • • 2433 338 • 1 10 1795 2143 21 2572 n i O 5 3104 31 5 94 2142 • 2152 573 O len� • 2434 3367 364 y 1 i > 93 0 10 10 1804 1793 • 0 •141 r • • 363 5:94 N •21 7 2154 2153 • 1 523 •2436 1 • ■----------- 1 O 7 • . 539 o I• 362 5 1 1 3289 2138 • 2200 53 • 3280 • 214 21 1 2198 25 5 58� • 2438 33 c 1 NQ 9 1805 0 328 1 36 • 2439 1 53 5 95 00 • 1 90 • 139 2157 j2164 • 8 • 0 3283 3282 2156 99� 96 2195 2590 48 0 •� 1 1 2531 2494 249 7 1 5398 5397 12 1806 • 2165 �A5�91 476 2443 •24405 99 3$7:4 3 1789 •1778 1777 •2193 2 730• 25 75 2444•• •24410 1 5 1787 1788 •1768 2885 2886 2897 2899 02 29 2908 2909 2912 2913 158 • • 2166 • 2168 2183 2185 7 2 1 N 2 8 1 188 2�7 2492 8 0000002449 i - 1 i Z 1781 V 1771 • • • • 1761 884 2887 • • • 2161 2171 2186 7 • 1785 165 1646 A/t • • • 2179 177 219 27 • • • • • • • 00 2450 1 3116 7 786 1772 • 1656 1649 28 2 2883Q&02 8 �0 11 1812 • • • • 1762 • 15 • 2172 • 52 2754 275 59 2gy4 2452 • 951 — 1 1 811 • 8 • 1784 • 1782 • • 0 •176403 1644 0 • 29' 2 102162 • 2167 2173 2175 21 1 74 • 2767 2766 27 761 276Q 4 6 • 6 3118 11 • 1810 17775 1774 1 6 2 2890 9 0 = 2 9 5 2751 2738 274 • •• 2457 • 4 1 5 02 11� 13b 3• 1809 53 1642 889 2896 2904 2916 2765 4 63 2761 5 A 1 0 a 403 31 1 �� 7 0 1783 4 0 28321 2820 2768 0 2 2 5 04 125 0 6. 3133 •1641 2881 2901 2 00 2928 2924 69 2927 291 2819 24 1 1 Q 2 • 3134 •70 •669.1667 1662 • 1660 1 58 55 163 1643 288 0 2891 92 1 2921 2837 402833 • 2817 2 47 0 �— • • 2892 ] 0 2 86 2 •• % • 2842 815 24 0 946 9 1 312 • • 1 3 • 1661 35 2834 IIIIIIIIIIII�IIIIIIII 1666 g�Q 2873 2 _ 2 212 2818 2945 1 • 12 • 1674 1672 1668 664 • 16 • 57 1634 , 1 2$72 2 9 1 9• 92• 2838 102841 11 283 0 61 8 01Y i 5406 441 • 1632 • 0 246 29 7 0 1705 1756 1640 2875 2 $ 5 7 `� 1 •5407 5 08 R 1 • : 17� 726 1758 • 760 ® 1631 • 2 0 r 2943- 5409 2862 • • 2840 1 • 1 3 • 1759 - •• •• • • 287!6l • •:850 2839 • 28432844 $ 6 1 b 1 3 07 1721 1757 • 1 5410 • 5412 R b 1 1727 1755 1 2876 2867 2865 2864 0 2849 2848 46 342 h 1 •511 168 • 0 • 175 1 2856 2854 8%2847 2 0 46 1 5 1 79 0 21 171�J2 • 2 8 5 5 • • 326 1i 1313 1 1 ® 2785 2 41 ! 5 — 1 543 • •5T4 U Q Q ' 1 • 3145 •172 1676 1 g - 1 1 5 23 148 1752 1328 • •1 1 2 319 • 8 2 • $ 4 — 1327 1321 1317 8 465 1680 1 1 172 g 1331 1318 1315 307 781 • 2787 466 2 0 1 5416 • •15 9 31 • • 720 1 1330 3 3 13A 3 6 2825 2794 78 • 29 9 3 1 •541*5 20 1 1 69 1751 3 3 1335 • 27 1 5417 • 315 y 3168 • 1 8 = 1750 1609 • � ' 3d2 9 8 4 02 � 2792 27 67 29 3 � 1 b a a •5422 4 1 3169 .► 1 •1iW 1334 1301 • •q g 93 5 y 1616 1617 1302 • 8 3 2801 2 1 5421 • +5 26 � 1 66 16 3 1 49 1748 • 1619 1 i 5424• •5 25 N 3� 65 ti 1 1 • • • �► � • 1747 • 61 • • • 1621 0,1439 1412 14 1 1410 1377 • � 295 �94 � • 2469 36 34 4 2 35 � 4 00 01/31/2018 Planning - Site & Architectural Review F+P Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. Pruneridge Avenue 4 c � F_ H N Iz O Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 1 • 01/0 64 + I 1615 1618 P • • • • 2470 3 - i 1 5430 5 nn N 160 1 1685 ' p *,,N 7 1 45 1746 1610 1 14 101622 ® 1438 1413 6 1375 12 03 2471 331 0 4�8 1438 1 • 29 1 g 31 1744 1604 1436 1 1296 2472 \ 6 �•1 1414 %1374 29 738 Alfred Nobel Drive 1 5432 �43 O 1697 • 1 5 •1603 1 1 •1625 1436 1414 299 1 u 5434 36 y > + 3 74 117 31 1 1 60 1596 1624 1435 •137 30 Hercules, CA 94547 1 gq � • $ � 7 • • • 5440 5435 IIIIIIIIIIII III III III II 1 4 3175 3176 43 160 1598 1 09 36 192 N 2473 35 T 510 724 3388 • • 99 15 7 • • _ 1 d71 1462 460 1458 1457 1 1291 29 �1 www.lukassociates.com Oil 58 1595 1480 1479 -i4 3 • 1 1 �'/ , 1338 2474 293 543_8 43T 0 R 31773178 • / • • 1454 • 1434 1415 • 1290 • 3 3179 m 171 79 1594 • 1455 1416 137 1337 r 1 1 = Z 3180 m 1 57 158 1587 89 1591 • • 1456 • 8 • 28 343 4 _ R 3181 m 580 • 1582 0 44 1 3182 a ® 1�5j 1581 • • 11901593 1 4 78 • 1432 •1 1339 • • 3440 3442:A4# _ — ■ — ■ 5442 5444 5446 5448 'T449 - _ b 3183 • 1583 1585 g 1588 590 • 1 3 • 1417 1379 • 128 343 I 43$43 438 3 1 �■•� •• A. -A.0 R 33 ■ _ 53 311 1739 •1592 • • • 014 3 1459 1441 • 1405 1368 •1340.12 6 01193 • 332 • ■ _ 4 ' —' —' ■ 5443 5445 5447 � 0 A 5349 i41 ■ 3 3185 `^ 173F• 3 • 15 5 1485 • 84 1477 1476 1472 1469 1431 181418 • • 1380 1341 8 • 1192 333443,347 45 N 5345 42 3 3186 1 1554 1 1 4 1 • �3 • 1419 1404 67 •134 1186 001194 3 / 3 8 Y449 ! 1 4001 73 • • 1430 • • 1381 • 1 3450 1 1 i �5 52 `� 5351 53 533 '" 3 3 3187 53 0 156 1572 1486 442 • • 1 1231 1230 1180 118 • • 4 45 0O 1 1734 1559 1577 15 1487 •1452 443 •1 6 3 •• • 1188 • 35+4 s� 52— • — 1 5455 56 > 1 1 • 330 3 •155 15 1 01475 •1464 1451 •1429 •1420 •1382 1 1 26 • • • • il-- 543 4 3 -1 1 5457 45 ®� 1 190 `173 •155 1569 15 • 1444 1403 1280 1224 g • • •1190 3320 •3 A3 E 3454 1 •. 455 5459 60 + 532 • 5324 1 733 66 67 1 • 1474 1465 • 1428 • 1421 0 • 1383 • 1 •• 5 1178 1181 118 1185 • • 119 544 3456 1 546 O 5323 1 1 1 0 • 1490 • 1445 546 Z 1 5322 1 9 • 101427 •1422 •1402 •13 136 1 1279 01232 01177 119800 1199 M 457 3458 — �- 1 1 546 • 63 "III 11. :� 1 a f 320 31 9• 564 5 1 1491 1446 • 1424 1278 • 1233 • 1200 �/ • 545 9 — 1 3460 1 546 31319 63 540 1468 1450 4 9 1448 • 0 0 4 1385 �� 1254 • 1234 1176 • 1223 1201 3 0 61 3462 1 ' 5466 67 . _ . _ _ / 313 • 9 • �' 493 146 1447 14425 III 1346 r 1 117 • 546 3466 1 1 5468 5 �/5 0 @ 3 546 41 1538 4 1532 •• '039 • • • 0 • 1399 1 • • 1117 y 465 34674_ — 1 5470 72 • 1202 3 O i L 3468 • — 547 90 r/ 319 154 1 1040 1047 1048 1053 62 36 • R '1 1 3 2 d 1042 10 4 • 1400 ;> 3469 1 547 547 ge 31 • 520 • • 117 • 1222 Ap + 04 33 54_ 70 1 Client 1 1 547 76 h 3 1 O\ 5303 w`• q� 0 00 320 1 529 1497 0 50 • 105 1056 7 12 • 1171 • 1203 33le 3 1 547 •53 e� o • • �� • 1017 1020 10 •1361 ®® 1239 •1170 •1221 1204 3532 0 L 3472 1 1 471 Apple Inc . 1388 53 1169 y 7.3—.-- 016 .3— • r 5479 3 3 1519 0 101204 80 5299 • •® �26• • 1 1397 •1389 317 • • 1 52 • 168 1220 U a..� 76 1 1 548 / g 518 15 1016 •1273 3 a _ 74 3475 5482 83 3 95 5300• 52 293 291 • 1517 1523 e 1527 • 1144 114 1137 1141 1090 1058 • 1349 • • 1240 • 1205 29 L_} 5485 48 320 1516 1499 3 142 • 1396 1350 • 1272 41 • • • 120 fn '�i478 i 1 1251 • • 1219�� 2 35� 477 1 5486 835 43 98 289 320607 • • 1140 10 1059 • • 1167 1218 • ' 79 479 — ■ ■ 548 529 • 515 • 1501 •008 • 132 • 125 124 5490 434 34 4 3 9 0 � � 287 • • 1166 0 48tf ' • 9� 3211 • 3208 151 • 1011 1131 0 1088 1390 1358 8 0 • • 1249 1 3 0116 •1217 •1 08 • 3482 1 5492 6 1500 • 135 • 3527 3 1 Project / 549 549 3433 3 3 4 0®® 5285 3212 32 3 0 2. 1006 • 1127 1 • 1357 1351 1269 1244 • 4 • 1216 115 O ■• 34 3.3484 1 1 5497 g 3 04 s 52 52 1 1125 • • 7 • ' 3432 3 3 i ®� 1111 1106 1393 1392 1391 1'Ldb1 •120 148 3526 O 9 •39 1 ■—■—■—■� antau Building . 54 5 619 321 1 5 1 3 1 004 p • 1 401063 • 1267 1266 126 124 12475 • 1163 10 •1149 ° 518 •3486 1 ! 54 • 52 9 5 3 • 1104 1102 82 • • • •geese, 1214 1213 1150 r a ' 1 Apple Par k ' 1 i 527 6 16 04 1110 • • �81 54 353 • • • • • ���2 127 9 1 — i ■ 55 1 3 3 O 1 5 1 1 1 1 1074 108 1069 1067 1162 1215 11 51 1 1 ■ 5502 34 1 Phase 2 ' ► .5 1 1�� $ 1073 �79� • 1265 1264 1263 1262 1 0 115 11571 11 I L �— 517 •■ — • — ■ ■ 1 3218 • 1 109 1246 • • ��•• • • 5 1 6 — 1 1 \� Q 3661 150 Ogg 1065 g 2709 3511 3516 8 5� 60 3662 3 321 1101 2689 2688 2687 2711 2712 27 • ■ • 3- 1 5 2 0 1 0 0 ° 1148 1 107 2613 2614 • 29V 2617 • 2677 2716 O • 1 1 1 \ i 3659 1510 3� 2610 615 2678 OH 7 3L90 1 Title 1 1 1 489 428 / 3622 • 3658 • 3 5 1 1 •322 3 5 2602 2612 2622 • 2620 2 19 2680 2681 2682 2 2684 2 86 � 7 1 ' 3 4 1 427 `" 11 2619 • • 00 O 1 3664 436 • 2 3228 •3230 qC0 2601 7 2608 2627 • • 2621 • • 267• • • • • 26 5 g 0 X 0 3 i Tree Disposition PIan 2625 2675 0 426 \ 7 • 23227 •3229 •204 2635 2629 • • • 2690 3298 2 4 ` 3505 3504 3 1 1 North (Sheet 1 of 2 ) 425 1\1 3671 • 362 3233 3231 • 2634 2633 0 631 0 2• 2626 2654 0 2655 • 2657 2704 2725 27 y . 350__8 3503 3 J 1 10 3656 0 • • 2630 652 • 2692 2694 2695 99 03 2706 • 3302:1 Ami 7 506' —' —' �— ■ — 3 — 600.1• ■ _ ■ — �� O 3655 °� 36 42 0 27 3241.4F232 0 2636 2649 2 • 0 • • 2656 2658 269• 93 2702%33296 297 :3300 0 301 • 2647 • 2653 2674 94 95 ,1 t AL N ! 3411 \ p 3665 % 69 q 3• 3629 3240 • • 32354 • 2637 2640 2641 6 3 2645 • 26 3291 s r i s __ __ __ __ __ __ - Project No. Date Scale at Arch E1 424 3 15 � • 3 3630 3237 3239 000 • • • •648 2 2659 • •329232 � / 1 3654 • • • 0 2642 2644 2646 2663 2662 J1 2673 • 3290 _ _ _ _ _ _ _ • 3631 32 3245 2638 2639 2672 2671 6 2668 3265 2667 2666 2664 r 2 3413 b ---- ---- 2193 01/31/2018 1" = 40'-011 '+ice < 23 3 16 �i 653 366 74io33632 44 6� 3279 r Tree D i ► ���s l �� n Plan - North 34 1 3412 18 39 3246 3248 `* 1 �'�-- 652 •3666 3 83243 • • 3249�� • 3.3 • 9 • • •3 3274 3275 , .:` O 1 1"=100' (1:120C�) } } } 3419 3417 �• 1 3 3255 � r � Number Revision 3650edQ _ 32P #2� • • z,)�V"273 • • • a 3 s • .. :;:.,, "[...�i• ^ 559 ! P-TA14-4.15 00 ' 3 0 \,� .. _ _ _ 3411 424 1 3 15 2 233413 3 � 16 34 1 3412 a 18 } } } 3419 3417. 3 3 ■ON ■ ■ 0 Off_Ramp ■ o 1 o }}t a a 0 0 0 a ■ ■ }tt 0 0 0 I. q1 if Total 1 1 i I I ' ■ I Total Phase 1 Phase 1 - Phase 2 - Phase 2 - AC2 Overall Project Tree Quantity Quantity Site A Site B Site C+D Summary (including Quantity Quantity Quantity Site A) Standard Trees to Remain 740 Trees 614 Trees 47 Trees 0 Trees 126 Trees Specimen Trees to Remain 01 Trees 0 Trees 0 Trees 0 Trees 1 Trees Standard Trees to be Transplanted 73 Trees 68 Trees 0 Trees 0 Trees 5 Trees Specimen Trees to be Transplanted 18 Trees 17 Trees 0 Trees 0 Trees 1 Trees Standard Trees to Be Removed 3,625 Trees 3,280 Trees 58 Trees 69 Trees 276 Trees Specimen Trees to Be Removed 49 Trees 49 Trees 0 Trees 0 Trees 0 Trees Total Existing Trees 4,506 Trees 4,030 Trees 105 Trees 69 Trees 407 Trees Total Existing Trees to be Removed 3,674 Trees 3,329 Trees 58 Trees 69 Trees 276 Trees Legend Existing Specimen Tree To Remain #### Per EIR October 2013 Existing Specimen Tree To Be Removed #### Per EIR - October 2013 Existing Specimen Tree To Be Transplanted #### Per EIR October 2013 0 Existing Standard Tree To Remain Per EIR - October 2013 Existing Standard Tree to be Transplanted Per EIR - October 2013 Existing Standard Tree To Be Removed 0 Per EIR - October 2013 Existing Standard/Specimen Tree To Remain Per Current Design - September 2017 Existing Standard/Specimen Tree to be Transplanted Per Current Design - September 2017 Existing Standard/Specimen Tree To Be Removed #### Per Current Design - September 2017 To— O "% 3655 p 3E�_ • 3654 653 652 • 3666 5 � 3 47 / 3 1 3 0 9 3 8 3 7 ri 41%.` �♦ / `•` �r to N O1 Tree Disposition Plan - South 1":100'(1:1200) / 3692 . V 140- O 4071 406 4068 40 4065 4062 4 • ,'2649 1, 2691—'77- r 12645 3629 3235 02637 •' 1 2648 • ' 3291 W W 32 3239 03630 3237 w22646 2663 2662 3290 32 ;044 4 2642 45 2638 2672 267116 44 2673 • ::. .6 ■ , JW, f: 255 IN IN 32501 #61 • • .: • 1 ,, , , '• • • •I •1•570 4569 , •:1 1 • 1 'll 1, I: �•:: •Y, I I . riGi 1III W44771 4768 4769 1 • , I ' ♦ ♦'11 ,44440 .♦ ����� _ :1 4805 4857 Ah 4546 4784 : •' ♦,,I,, r�r;��f;� ,1 I.<<►1, I, I,�t� •,, iii 2?•,�� �1 4714 ♦O♦♦i'•♦�i�♦i♦♦i♦♦i♦♦i♦♦i ♦i �i J•,i ♦iiii,'u• •,',I ,•• `••, r. ♦,.1,,,1,1,,1,,11 �i,,;♦,.;I;�,;;I,;I,;I,,,;I,;11;♦I;I,•I,•I;�11'9' • • • , ''''''' .i,♦i,. r •. ►. ��i,♦,•i,♦i;is♦i♦•i��i••i��i��i��i��i�♦i��i . ;� � ' • ' �'��� ,0,0,4 si!%��ipipi;,i♦♦i0i;0;0;•4•♦i O♦♦;♦♦i O♦♦:♦4♦♦i 1,'� `�' • :%•;i•;' 4p pOlpO..pi • hw, pp p:, •,,p,•�,,;0444; ♦;p;•=�'?,�, ,..,,, � ;'.� ' I I . • �IM ,, I, I, I, I, I<. �♦,i , I ♦ ♦ ♦ ♦�Iw♦♦��J�I, I, I, I, II . �I♦♦♦1 �1 ,,, •• iie.•II 1.1 �I,•I,�I,�II I,•♦; �II�hp1♦jI�II�♦1♦ 1+.:� ��♦♦L,L•I♦♦I♦♦IL• �9Jn1"'.. 1•♦I �1••1�♦�J '�l ,, <<< ' • I ♦: ♦i ♦i:i:•i♦•i;is i �ri�s:♦i♦♦: •i..; vi ♦:+i;♦i:♦♦i•:♦O;♦�°i♦j♦:;•i,.'v:♦•♦♦♦♦♦� 4. °�♦�s.. '•'•,• , , • I ' • • 11 �I,�I,�I,,1� ♦,,♦I,,I,,p� I; ♦ 0�,:♦,�I,,I,,III ♦ �G y r'j I,•I,,I,,11,♦I,,Je.;� AI,♦! ,Ip.1 � � ••,, ' 1 I " � - - ' 400... ♦♦,♦,♦r♦ .,. •1 ', �Q;I,;I,;II,•I,�I,♦I;II�♦I Iii �p��♦II♦♦I�♦I III�I �.I;II ►♦1♦I♦I I I I I I �. I J , - �,,, ♦, I, I, I, I, I, 11'1 ♦ ♦i.6,11 I I/ � ♦ I, I, I, I, I, I, •. ///%♦♦I �p •• ..,,I,,♦,.,,II, I, I, 1, 1, � ♦ II 1 I ♦ , I 1 1 I I ♦ I 1 1 11, i. ,.•i♦i•i♦i♦iii♦iOO; ,,, >,;♦44♦w^'ippi; :: p0♦i , ♦�♦e ���p`, ' 11' �� ♦ .. I �,...;;.;;,,;;.;;♦;;,;;,.;;,;;,�;,;;,,� 1,,;,,�,� �.,�,.;,Ii 1�,1,1�O,;I,;I,;I,II,�I,�I,�IIl:1 �O�I ``.< r � I I I•i41 ♦♦ �I,�11 �I ♦I O,•II�♦i OI Ji ♦ �•:0♦•i i •♦ Jif: I♦,I♦,,0;,1;♦11♦,1;,1;♦IJ.,1 O,I,♦♦,II • 1 • ��� +i ♦ii„O•i,♦o♦io.♦i,♦.0♦i .♦i, 4i o' X04♦. •11• •• '.1. .-,�� .,♦♦♦♦ ,♦,♦i,♦ ,♦,♦,♦♦i♦ rt/,♦♦ ..,♦ p .♦♦ �11♦11.11�1,;111�11�11♦II;IIL11 I�'J..O♦�1;•1;11 !1! i�:1��1��1�0�0�♦I �I;+I; ��a�• Jv �� ��♦ o ''� ♦♦I��1♦�I �I �I:O�•I.11�♦I•♦I 0. J ♦f,, ♦♦ 4 ♦, �� �,�,�,♦,,♦,,♦,,,, , ., .♦., �,.!``: �I' ' • • I 7 �::♦ipp,;4,p; pp,�,,p,0,� ,� ' p4,,O,p, r� c_�s•♦p,♦i,♦i;i,♦p♦i♦'•i♦♦i ♦i:i♦♦♦i♦♦i �� 1 1 ::1 L r.. ,•;•,,;p;pp;,,ppppp ,pp • •1'. . pppppppppp,.. ♦.. I •.,• ,.I: '.1 �.I• 1 i::;�•.. �, --Q1,7­1 �♦i�p♦4;4;4;0:♦O;i;�i;♦:�♦•♦♦����r:. • ssr! ��p4;;;;♦%♦��, ♦♦♦�!!:���c,�,, >:.,,v j � •• iii i � . �,ppOpp♦ii� �i♦. �♦%� ♦ , r ♦ii ,�, ♦ ,,,,.;;, � , �,,.,,;,,.♦;.,o;.♦o;.;•.;�.♦-•.��! X0;4 :�:►4� ..<.�..•�. �/ � ����� , nl ♦rf4or.4 ♦ , ♦ ♦ e � ♦ , ♦ ♦ ♦, p p p p,�i;i 'r;�l;:ri,♦il '-: �,!♦,•♦�i♦♦i♦♦i;♦i:♦♦i ���,;♦y�, i � ••��� , , '' � p0♦i p♦cp�.;.• X11 .•ii, ♦i♦i0 pp4♦i ♦i♦i , ♦ ,w.i♦i♦i r,.,, •0♦ip♦i♦i .� /, O .� ��� I� r♦i♦i ♦ ♦i4 , ♦� � ' •,Gp ♦ pp♦i � ,i0♦i ♦ O ,r,,<.r . 0 ♦ Q•i♦i ♦ ♦ ♦ � \ ♦�♦ 11.10 �1, II �1 •i,•i, 11 V� •C.`,•01♦I�. �Oiyi,1♦,I♦,11,,1,,1,,1,,, J♦�,�fJ. I < � �r.I,,;,,;1,;I,;O�Iq 141 •, 'yl ' • 1, 1,1,1, ♦, 1, ♦, 1, ♦, ♦, 1,�;. .•. �,. ♦►1 ♦j I, ♦1;1,x♦ I�� G�'I, ♦i..♦j•1,,i �11�< j �)♦�1;��, .♦j •'� •••v\� : , 1ii,♦,4ppppp,p, �.:� ��<r•ii;i3Op s,er.w ,.,ppo6•.pppp,,,., r / •, J,.I, I, I, I,y I, II �I� ,�I JI �I I I I ♦ , I ♦-'••• Opp ♦ ♦ii p ♦i p ♦i O s; 0.q :.�' : � � � r.♦i e, �,1i p p ♦ •, p ♦ r 4;i ri 4,9;,,♦i,♦ipp;♦i;♦i,♦ip♦4♦i;♦i;♦i;;♦i• • \ li♦i♦i♦i,♦i♦♦ii ♦i, ♦i♦i♦i ♦i,�i♦i•.9 �� � ` Qj-:-..♦i ♦i< ♦ii �. ♦ , s a'� ♦ ♦ ���. ppp 4444 ♦i0♦ipg0i4 ,l,♦•� ��,.. ; . ..•.'s: • 4 ►...,p0, r.4s pp0 OOyr+i,,! !a:. .,� �.. I, I, I,,,, I, I,,1,,,, 1, 1,,,, 1, 1,, p,�w� , �V 11 , ,, ,, y Yl,, .l,T 1p I, I, lJ I, , y. 11 ♦ L.,i ):rn � � r ., I, I, I I I, I I I I, 1 1 „j \. ' Y .,� + ♦ ,,, � 1 1, Ij.� Ij,1i 11 �I I, 11 •� ♦ IIS°.. ' I G .. . ♦ .. ..a' ,. .. . .. ��/fir I ►♦: ♦I♦•1; ♦:�1♦♦I�•11•♦I�•I�•L11�0♦�I��1 ♦♦I�I�♦I�•iJJO �� ' !� 111 O II . 1 ♦ 3 ♦. ♦ ♦ • .� 1 I I, I I I I, I I I II I I I I, ♦ I, 1 I ..` \, - •.4♦ �1 l ., •I;I,41,I,,Y, _ II ♦ 1�, �,,1, ,., I,• I, : Ip ♦, 11 •I ♦ / . �: 40. 4054 4053 J - ®®®°.`•.;;;;;;.;;.;;.;;.;;.,;.,;;;�.;;.,;.,;♦4;.441 ' • ,. ',�w`„ :;.4;.4;.4;.4;..;..;. ;.►�.�..;..:�.: �' , , ..,.,.; 4.4;..4..4..;.,...�•: 1Z,I 4212 0 NEI �r • J N • 6 XY • • • { }•;• « V ' antau 14 - omm Buildin _ r „3617 « - M Ila f « « r 5 .1 ■, , •_ -- `M R), �'567 "',568 _ '1 un 576 ■ C67 r• 0, ' ill ILH mi I Ilk, )t582 ■. I in ®II--',iG584 m L . �+ T588 589 � II . , ; �d� y; 1, 1 .: ►. ' �� � I• 00 O p•i 0O; psi; piWW 47140*7 ,�i,4i;�i;•i;� , , ■� 1 •iii,♦♦ ♦.,.♦♦ ♦ '�/ '` i !4000♦i! .•i4•i�i�i�i1. ,v•S'ri�i j rpppp,� .t�°� ♦i;i;i,�i:•i ��ii�i�i♦i / • 1 ■_� �p4,O,Op Cy � ,i.,i.,i�;p;0:444,;,0 e. G, yppp4 �Op♦ii�i�i�ii•i�iO•ii :, ■ ■I1• SII ,,.�.i, I,♦, ♦, 1,♦, ♦ ♦ , ♦ , ♦ ♦ , ♦ , ♦ ♦ , ♦ III /' i;i : , _— ;;,�;,�.,,p,;,,p,;p;p;p;O� 4•i;•i;�i;•ii 4�0�•i 1 : � , , �® � • ♦ ♦ pp♦iii•i•:•i•iO•ii�i�iii�i�iii�i �OpOpp♦.�,p��,;.4;.;.4;.;.;.40,0,0;.00;.;., � 00♦,,p,O;pp: p�i;i;i,�i:•i��i�•i�•i�•i ■® !!R ♦;,;,,O:pipp�I0,;_,4,b;;0;:00;;:;:;:;:4�4�;:i::i� '%�.� �, �,� ■® iLi'1 pppp,4,� r,<v�Lyi;i;i,�i:�i��i�•i�•i�•i��i��i�•i�•i��:,,, ` �r ♦ •' 10 NINE■ i 1 • _ �i,.ipp00♦i•i•:•i�i�i•:•:�i�iii�i•iii • • 1'SI r' ---- �.r__ 1: _ .,...^.,.,,,,,,,..,,.,,.,,.,�pp,O,pop,0.0.4.0: p0 t 1. •■ �uuu.u. 0 ■ a e c ....I.,�,� f, �,�f1,1 j,11,11j11,11,1I,11,11,111�11�11.1:4�•IJ•1��1��: •1� J ' 1 • : ■ �1�' , f' ■i0 JbIJ64. _— ��•��•♦•J��,��1,,,,,,,1,,1,,11,�1,�1,�11�•1�4�4�•I�•I��I��IJ•1�•:•,,, t►' : ` ,i ■�� ♦,,Ir O,I,.I,,I;,,;I,;I,;I,;,,;I,;„;I,;I,;I,;I,;I,;I,;I,;1;,,,,' • 1 , , / �b � ,�a :i••1,�1,•1,•„�1,4;1,4,�I,�I;I,•I;,,I,,I,,I ■� �1 I _— �;�,.�..,�,,�.,�.,i.,i�,i�,i�.ipipi�ii�ii�iiii�i _ , / � ,, ► . ■I1� � 1:. '•i�•i��i��i��i�•i��i��i��i��i��i��i��i��i��i��i� _ ■� ■ :� � � _— North R&D - 5089 �ElIMP MI. Planning - Site & Architectural Review 4P;44 Tantau 12 Reason For - -. '40O♦i♦♦04440040, ' • ; � 1.: .,♦ , .• i Issue ■� RT ♦ ♦ 1 ■;PLANNING APPLICATION 44.44•,;.:;.;; � � L__!� , ', I �����' �• •.■■■.�■■■■�■.■■.■:■■.1.I O;♦OO;ii�� ::oma / i = 1 �'■ , .Key i r0dp000�,.,..,.,.,�,�.�• I11 ■ � ��•��•,��•��•��•��••��•�•��••�,��••���� �• Pruneridge Avenue i,p;p;OOp♦i ♦i00pp0 ♦ ♦ , ♦ �- �''� • � I, � I : • • II1I1 1 : SSCI ■■ � 1�'�I /. III ■� !■LI 1 0 p 4i �i•ii 0 ♦i ♦i •i �i ♦ii �i �i �i ♦i . � � , , 1 �V r , ♦ , ♦ , , ♦ ♦ ♦ , ♦ ♦ , ♦ , ♦ ♦i ms's■�_ _ ■� � 1 1 ♦,♦,♦ „♦♦♦,♦♦,♦,♦ rr `I�\F-,.i�u� • • . I'; • 4,4,p;i,ippOOO♦,0044♦i �''1�s•i •: 1 ■, 0 1 ■ ■� 1 ,r���i,�,;..,,♦,�i,i♦„.;�,0,,�,,,.;.;,p.4,,i,♦,�;,4;,0.,,,ii♦,�i,;�;,�0♦,,�i♦,�i,;,pp ;4♦ip,i,;0p;p,�ip,�i,;444,i♦,,:i�4,•i,,i♦;;�0b•♦i♦,.�,;4,•pi♦;4,�44�,i♦p�•0:p;;0.♦•,ip,0 �;��♦♦;ip,;�;�.♦♦ipp i4,♦` 0 p i p�♦!4;•>p;���;�ppi��♦•pp:�,,; O•p ;i•,�♦�p�♦ii�,• •• ��i iY•i�.,♦,'•�oi♦♦p♦ '•• , 11 j .Tantau 11 IL■ 11J11' i111�9111'LL�■L1/LVia'■:1LY1■G#iL##Yli 11:i EW, p4p i If*#OiI • 1ii0ii ,♦,; p 4,All' '1 ♦ ♦ II II �' #A# �1;: �' ■� Lill • p p,,i,,i,.i; piii..i.,i�.i�.i�i,�i,�i,�i,;.,;�,;�♦;,,;,� .i��,� i,♦i :� "1 • 1't .y7gnYi# ”—�_� ri0400000♦i•i♦i♦ii�i�tr: 444•i , �';1♦ ♦ ♦ I ■ ■--- ■� , O♦ii♦i4, c ►`♦ ♦ • • + ' ♦ II III < 1GYITiti7t ■ �•��� �;pO0�i.4i;0;4;O;0iO�Os r•,`./ , 1111'! JIM!►^ 1 ♦ ♦ , , , , , , ,, O0 i, c,t,•ip r ♦ ♦�00 II III b�1111U#, -11 a,■� ,�,,,,,,gO4p0 , ....,♦60b;♦;.O♦ i�r..�.p♦ �71, 5114 '711 LL.##■IM 1rr '.► ■ /;"" '15 rpp00p4p4p0�:♦i ♦ ��. ♦ ♦ �, i ::: • . III##irll•J �I! ■'5116 05121 ,�,p; �,p.,,,p�4� pp,0,0,�i ��.�' �4��i��i�� ��:�:�:�:�:�.A �� III '�##wllA 11 ■ ■� � ;4i iii:�i. �i;�y��:�0�4�• i Ol� �:���� �' �1 ' .. ■ ♦,♦♦♦♦,♦♦.+:.♦,♦♦ ♦rte,, ► ■ r.IN piO0dpp0004 ♦,�;,♦,♦ V' ll11 1 :1 -■ , �E r 5126I p0•i�i�i � � � 'NF� 05124 i127 � 5238 5, ZIM . ■= iLiJ \ ',,,• ��,�,11,,,� I , I�` :u .•, 1::}illi • 0.. `South'R&OP ■� 49�g Ill' u 11 VC I�� , � ,.. 0IM�, Y �'■� • .� . ;05246 ■= I;MA Ir�'*4992 111111 05247 I ■I>© 1•�I G I 1111► _ i® ,4 i-oster -t- Fiartners ;1 525055252 ■ ■ I1� 1 --05249 f145 IM 'IV 111 • 5256 5258 ■14 Oak■ ■ iiMM ; ■I�C� fii'049 ' 1 CI ,II� ui14 San Francisco, CA 94111 4976 ;IbbJ T 408 610 5800 1 I r4945 o illl Lug cswww.fosterandpartners.com Foster + Partners 2017 4975 ■l INouth R&D rel �� ; II;4944 i= �� OLIN 4942 LANDSCAPE ARCHITECTURE AND URBAN DESIGN - �' ■u m i ■i a u 17■■■r■■■�. oc�.•�■■■■. .. N: A 4941 Public Ledger Building, Suite 1123 4915 V 150 South Independence Mall West 49 4940 Philadelphia, PA 19106 ------------------ 0 1 „111 1 . 1 l�®ISA - • • . ' • OLIN Partnership. Ltd ���i�R���• ; ' •, ,� 7 X4114926492T–_-. 93 4939 40J 5177 Luk and Associates ­_ 49311 4938 5173 493 1 ' 4932 4935 ipll' M ' ■ 4934 5216 CI `2 738 Alfred Nobel Drive 5265 Hercules, CA 94547 T 510 724 3388 /5214 ie 05266 I .: 5209*41111111. II IIIII� • � �'�-. � F� IIIIV°IIIII�I''°VIII°' ' •\ I1., L��,I � •I O Z !6 IIIIIIIIIIIII Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Tree Disposition Plan South (Sheet 2 of 2) Project No. Date Scale at Arch E1 2193 01/31/2018 111=401-011 Number Revision P-TA14-4.16 100 00 N O�I Landscape Plan I1" = 40'-0" O O O FOR CALABAZAS CREEK TRAIL MARKERS, SEE CREEK TRAIL PACKAGE. -_--PRUNERIDGE AVENUE ,CALABAZAS CREEK TRAIL SIGN, SEE CREEK TRAIL PACKAGE. i (8) BIKE PARKING, DTL 1/L8.02. / SWALE / STORMWATER AREA, TYP.. PARKING AIR INTAKE, SEE ARCH DWGS. EXISTING CMU RESIDENTIAL WALL TO REMAIN. STAIRWELL, SEE ARCH DWGS. STAIRWELL, SEE ARCH DWGS. (1) ASH URN. WASTE COMPACTORS, SEE ARCH DWGS. PARKING STRUCTURE BELOW, SEE ARCH DWGS. LEGEND - - PROPERTY LINE SETBACK LINE RESIDENTIAL WALL TO REMAIN WELDED WIRE MESH FENCE EXISTING TREE TO REMAIN PROPOSED CANOPY TREE PROPOSED CANOPY TREE PROPOSED CONIFEROUS TREE 0 PROPOSED SHRUB TANTAU 14 TREES Existing Trees to be Removed: 43 Proposed Trees: 250 0 20' 40' 80' General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All dimensions shall be verified on site before proceeding with the work. 4. OLIN shall be notified in writing of any discrepancies. 5. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review DB Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. Pruneridge Avenue Fr -/i F_ a) J1 _J1 c m Q CU c H N z O Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Landscape Plan Project No. Date Scale at Arch E1 1738 01/31/2018 111=401-011 Number Revision P -TA -14-4.20 00 �� SWALE / STORMWATER AREA, TYP.. PARKING AIR INTAKE, SEE ARCH DWGS. EXISTING CMU RESIDENTIAL WALL TO REMAIN. STAIRWELL, SEE ARCH DWGS. STAIRWELL, SEE ARCH DWGS. (1) ASH URN. WASTE COMPACTORS, SEE ARCH DWGS. PARKING STRUCTURE BELOW, SEE ARCH DWGS. LEGEND - - PROPERTY LINE SETBACK LINE RESIDENTIAL WALL TO REMAIN WELDED WIRE MESH FENCE EXISTING TREE TO REMAIN PROPOSED CANOPY TREE PROPOSED CANOPY TREE PROPOSED CONIFEROUS TREE 0 PROPOSED SHRUB TANTAU 14 TREES Existing Trees to be Removed: 43 Proposed Trees: 250 0 20' 40' 80' General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All dimensions shall be verified on site before proceeding with the work. 4. OLIN shall be notified in writing of any discrepancies. 5. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review DB Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. Pruneridge Avenue Fr -/i F_ a) J1 _J1 c m Q CU c H N z O Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Landscape Plan Project No. Date Scale at Arch E1 1738 01/31/2018 111=401-011 Number Revision P -TA -14-4.20 00 O U O x V V I 0�, ID 1O O O O O OO. 0 0 0 0 0 0 OI 1100o I l Cr - 0oc_r� _. I PRUNERIDGE AVENUE 2 a O ° O � O �t• O x - . ? o - -- — -- xLLJ oLLJ/ \ ' O 0 N WF"11177M , { 4 - i o �O 0z ; 00 ---- A A ° I i O O Ooco)I ..�. O� . ,00 e 0 • 0 / 0000 -0,O I' I N �f0 I SITE landscape Plan Rendering � 1 " = 40'-0" °` j 3 0 CREEK O �. ACCESS cO O GATE P�PtiP / _ } _----- - O 0 20' 40' 80' General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All dimensions shall be verified on site before proceeding with the work. 4. OLIN shall be notified in writing of any discrepancies. 5. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review DB Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. O Pruneridge Avenue O F I_ I c a C N z O Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Landscape Plan Rendering Project No. Date Scale at Arch E1 1738 01/31/2018 111=401-011 Number Revision P -TA -14-4.21 00 00 N O�I Landscape Plan - Trees I1" = 40'-0" 0 -'PRUNERIDGE AVENUE '�"�0000� �I F .0000 00000 1000 00000 i i 0000, 00000 0000, FAI LEGEND PROPERTY LINE SETBACK LINE • EXISTING TREE ULEA SWAN HILL OLIVE OOD DECIDUOUS OAK CODE SIZE EVERGREEN OAK CODE NON -OAK DECIDUOUS TREE SIZE CODE FLOWERING CHERRY TREE SIZE UCODE CONIFER SIZE NOTES: 1. THE CONTRACTOR SHALL SUPPLY ALL PLANT MATERIAL IN QUANTITIES SUFFICIENT TO COMPLETE THE PLANTING SHOWN IN THE DRAWINGS. PLANT MATERIAL PROVIDED BY OWNER IS INDICATED IN THE PLANTING SCHEDULES. 2. PRIOR TO SUBMITTING BID THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT OF ANY DISCREPANCIES BETWEEN PLANS AND SCHEDULES. 3. NO TREES SHALL BE PLANTED BEFORE ACCEPTANCE OF ROUGH GRADING. 4. THE CONTRACTOR SHALL LOCATE AND VERIFY UTILITY LINE LOCATIONS PRIOR TO PLANTING AND REPORT ANY CONFLICTS TO THE LANDSCAPE ARCHITECT. 5. THE LAYOUT OF PLANTS IN THE FIELD IS TO BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO PLANTING. 6. FOR PLANT DETAILS, SEE L9.10 -L9.11 7. FOR CANOPY TREE SCHEDULE, SEE L9.20 8. BOTTOM OF BOX SHALL BE REMOVED FOR ALL PLAZA TREES AND OTHER TREES OVER STRUCTURE. 9. ROOT BALL PRUNING MAY BE REQUIRED TO SET PLAZA TREES AT APPROPRIATE ELEVATION. THIS SHALL BE DONE PER SPECIFICATION AND ONLY AS DIRECTED BY PROJECT ARBORIST. 0 20' 40' 80' General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All dimensions shall be verified on site before proceeding with the work. 4. OLIN shall be notified in writing of any discrepancies. 5. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning -Site &Architectural Review DB Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. Pruneridge Avenue Fr-/ F_ Q CU CU N z O Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Landscape Plan - Trees Site B Project No. Date Scale at Arch E1 1738 01/31/2018 111=401-011 Number Revision P -TA -14-4.30 00 0 i Doo I v U •O• •O' •O• I i •O• •O• a U 0 000 n _ • pv e a l O O O i t �x 0 —PRUNERIDGE AVENUE LEGEND PROPERTY LINE SETBACK LINE NATIVE LAWN AT STREETSCAPE BMP PLANTING NATIVE LAWN BENEATH OLIVE TREES bNO' PLANTING BORDER AT STAIRWELLS LOW EVERGREEN GROUNDCOVER AT PARKING LOT CALABAZAS CREEK RIPARIAN AREA PLANTING NATIVE LAWN AT BUILDING FACADE General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All dimensions shall be verified on site before proceeding with the work. 4. OLIN shall be notified in writing of any discrepancies. 5. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review DB Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. Pruneridge Avenue a) J1 —A c m Q CU c H N z O Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com ©Foster +Partners 2017 OLIN y' LANDSCAPE ARCHITECTURE AND URBAN DESIGN i Public Ledger Building, Suite 1123 150 South Independence Mall West Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. i� Project Tantau 14 Building Apple Park Phase 2 Title Planting Plan - Herbaceous N OPlanting Plan -Herbaceous Project No. Date ScaeatArch E � 1" = 40'-0" 1738 01/31/2018 111=401-011 0 20' 40' 80' Number Revision P-TA14-4.33 00 . I i o 0 0 0 o U ° U I O O o O I ° i ° 0 O O O O I ° ° I ° O O a O ° ° 0 O O O O O ° 0 ° U > O O O O O > ° U w ° 0 ° LU w ° 7 711 0 o 8 0 m 0 O ® ® O o ° 1 a � o \ --- e17171 ° O O O O ° \ of \ 11- E ° � o°000000 O O O O O N 0 �I Planting Plan - Trees - Site C+D I1" = 40'-0" I CREEK -- ACCESS GATE I O -- LEGEND PROPERTY LINE SETBACK LINE • EXISTING TREE ULEA SWAN HILL OLIVE CODE DECIDUOUS OAK SIZE CODE SIZE EVERGREEN OAK CODE NON—OAK DECIDUOUS TREE SIZE CODE FLOWERING CHERRY TREE SIZE UCODE CONIFER SIZE NOTES: 1. THE CONTRACTOR SHALL SUPPLY ALL PLANT MATERIAL IN QUANTITIES SUFFICIENT TO COMPLETE THE PLANTING SHOWN IN THE DRAWINGS. PLANT MATERIAL PROVIDED BY OWNER IS INDICATED IN THE PLANTING SCHEDULES. 2. PRIOR TO SUBMITTING BID THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT OF ANY DISCREPANCIES BETWEEN PLANS AND SCHEDULES. 3. NO TREES SHALL BE PLANTED BEFORE ACCEPTANCE OF ROUGH GRADING. 4. THE CONTRACTOR SHALL LOCATE AND VERIFY UTILITY LINE LOCATIONS PRIOR TO PLANTING AND REPORT ANY CONFLICTS TO THE LANDSCAPE ARCHITECT. 5. THE LAYOUT OF PLANTS IN THE FIELD IS TO BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO PLANTING. 6. FOR PLANT DETAILS, SEE L9.10—L9.11 7. FOR CANOPY TREE SCHEDULE, SEE L9.20 8. BOTTOM OF BOX SHALL BE REMOVED FOR ALL PLAZA TREES AND OTHER TREES OVER STRUCTURE. 9. ROOT BALL PRUNING MAY BE REQUIRED TO SET PLAZA TREES AT APPROPRIATE ELEVATION. THIS SHALL BE DONE PER SPECIFICATION AND ONLY AS DIRECTED BY PROJECT ARBORIST. 0 20' 40' 80' General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All dimensions shall be verified on site before proceeding with the work. 4. OLIN shall be notified in writing of any discrepancies. 5. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review DB Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. Pruneridge Avenue O F_ Q CU CU N z O Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Planting Plan - Trees - Site C+D Project No. Date Scale at Arch E1 1738 01/31/2018 111=401-011 Number Revision P-TA14-4.32 00 � I O -- LEGEND PROPERTY LINE SETBACK LINE • EXISTING TREE ULEA SWAN HILL OLIVE CODE DECIDUOUS OAK SIZE CODE SIZE EVERGREEN OAK CODE NON—OAK DECIDUOUS TREE SIZE CODE FLOWERING CHERRY TREE SIZE UCODE CONIFER SIZE NOTES: 1. THE CONTRACTOR SHALL SUPPLY ALL PLANT MATERIAL IN QUANTITIES SUFFICIENT TO COMPLETE THE PLANTING SHOWN IN THE DRAWINGS. PLANT MATERIAL PROVIDED BY OWNER IS INDICATED IN THE PLANTING SCHEDULES. 2. PRIOR TO SUBMITTING BID THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT OF ANY DISCREPANCIES BETWEEN PLANS AND SCHEDULES. 3. NO TREES SHALL BE PLANTED BEFORE ACCEPTANCE OF ROUGH GRADING. 4. THE CONTRACTOR SHALL LOCATE AND VERIFY UTILITY LINE LOCATIONS PRIOR TO PLANTING AND REPORT ANY CONFLICTS TO THE LANDSCAPE ARCHITECT. 5. THE LAYOUT OF PLANTS IN THE FIELD IS TO BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO PLANTING. 6. FOR PLANT DETAILS, SEE L9.10—L9.11 7. FOR CANOPY TREE SCHEDULE, SEE L9.20 8. BOTTOM OF BOX SHALL BE REMOVED FOR ALL PLAZA TREES AND OTHER TREES OVER STRUCTURE. 9. ROOT BALL PRUNING MAY BE REQUIRED TO SET PLAZA TREES AT APPROPRIATE ELEVATION. THIS SHALL BE DONE PER SPECIFICATION AND ONLY AS DIRECTED BY PROJECT ARBORIST. 0 20' 40' 80' General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All dimensions shall be verified on site before proceeding with the work. 4. OLIN shall be notified in writing of any discrepancies. 5. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review DB Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. Pruneridge Avenue O F_ Q CU CU N z O Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Planting Plan - Trees - Site C+D Project No. Date Scale at Arch E1 1738 01/31/2018 111=401-011 Number Revision P-TA14-4.32 00 r S � rl. _ - r r _ L r • '1yR' -F S ' � r• r 'rT al. G 4� 1r F inRX ��.•3 ����s � �- yam" �i l'• ... 1 � R' ••J ot tO -,e A,' JI / + W1 14 i Ll u 7 1 lk �k- J R Pk : 'S' ] 1 T _ t � :I,• 7 JF 1 I �4• IS + r`'0 �' lir ` J r ;`moi r ,f J �,�, -� } r - J • ,I�I fi,�• ! ' - �I` `, I �1"Jx,.l _ 1 1 ''�,�!! r �.T -;� -+J14 'f' 5 ''1 , ,, II "•i' it i I k I� ll'I �� l,ll � 1-.{': ' r r/h'} �4J■ �•�%! / ` - `�1 4'r 1 F 14 � I � � I til fin` � ' - � .,C,•� 1 �A°/�//ff%% . `•� 1 � s!'�1 lyd'�i1'{1 I'I!1 'j�� ''l�S I� 4 'r r� y�� � � \ i,� �,�����*y�� iJ 1 � '�i'{1 �' 4 i' ♦ ,a I I i. If 1 �::?'klr �{/` 1 4' ••li'. `�� � __ ' , 5 ti '!� J 14, I' { kL `�-r Yr1►i. �r2 1• �-Yr , t' i . _ _, +� _ 1. �; ' Sal: ' "� 1. '�.P I ,A. �t - �' • , ', rF L air L `1` y1 s PT, L t �'Sti, 1 Ill rYc�� � -. jVk='`��-:. _ :L �}, w� �fLJ I �:•f r• i� � � �1• 00, - I f I fo ; + r _ . e*1�Ik5 t.'C.L ' F X �J 3 P, I[- : • r F l L � L-. { •4 v L • r� u• a�L.aFht • f � J - � � - i' - r r I' r • - 1 - L ' r .5 't rk * ref 1 .• •J ` '•.{Lal ,rq �.'• �1 � • r J ti '• r l r ' `I ... r 3 t �� .l ,•y' ' Ivr + Y ' N i• r re 1 L 1 •'fl ; r I 7 - •'� 'r �' I r r I r 1 I ` I r� F Ilk - J ' 1 1 �a r a I'I 'IF rar - 1 I • . r 1 . �r fa• � r I r09 1 i f ■ r r -f 1 ,' rr or If , S FF■ , , � i • f1 •, - l Y7 �f ,� LJ 1 , -�LM1ir �• - - 1 � v ■ 1 1 f t L y 1 , 5 1 If � LP 4.11 1si r Sr R 1 v • - r%.. Si• - r rF 11 +r pPI nyY -39' - J •� : 1 ti ��• � r r z � A+ �6 _ 1 •- v 1 r % 1 Ja zf 1 r - L 6 ` r -- r 1 ' 7f M 7 1 r:- r f L �ru -- M J +� v , 1 16 R` ' V . — i— r. - �� { 1 r T 1• iM11111111111 r iris .-I • rste r + Pa rt n E i I! �-�-�•T•� Fal �_ p -ir , v� f I 1 3i 7 J r l F P N J f i , r 'P n t" 9 , ! r v } p i - h 1- k J , _ .. ,f' - - - 1 -•,� ! y0. r � 'y�{� � - :f- - - � r•t� -. ? •` I �� 'i''. ,r, ;r � 14 S � rl. _ - r r _ L r • '1yR' -F S ' � r• r 'rT al. G 4� 1r F inRX ��.•3 ����s � �- yam" �i l'• ... 1 � R' ••J ot tO -,e A,' JI / + W1 14 i Ll u 7 1 lk �k- J R Pk : 'S' ] 1 T _ t � :I,• 7 JF 1 I �4• IS + r`'0 �' lir ` J r ;`moi r ,f J �,�, -� } r - J • ,I�I fi,�• ! ' - �I` `, I �1"Jx,.l _ 1 1 ''�,�!! r �.T -;� -+J14 'f' 5 ''1 , ,, II "•i' it i I k I� ll'I �� l,ll � 1-.{': ' r r/h'} �4J■ �•�%! / ` - `�1 4'r 1 F 14 � I � � I til fin` � ' - � .,C,•� 1 �A°/�//ff%% . `•� 1 � s!'�1 lyd'�i1'{1 I'I!1 'j�� ''l�S I� 4 'r r� y�� � � \ i,� �,�����*y�� iJ 1 � '�i'{1 �' 4 i' ♦ ,a I I i. If 1 �::?'klr �{/` 1 4' ••li'. `�� � __ ' , 5 ti '!� J 14, I' { kL `�-r Yr1►i. �r2 1• �-Yr , t' i . _ _, +� _ 1. �; ' Sal: ' "� 1. '�.P I ,A. �t - �' • , ', rF L air L `1` y1 s PT, L t �'Sti, 1 Ill rYc�� � -. jVk='`��-:. _ :L �}, w� �fLJ I �:•f r• i� � � �1• 00, - I f I fo ; + r _ . e*1�Ik5 t.'C.L ' F X �J 3 P, I[- : • r F l L � L-. { •4 v L • r� u• a�L.aFht • f � J - � � - i' - r r I' r • - 1 - L ' r .5 't rk * ref 1 .• •J ` '•.{Lal ,rq �.'• �1 � • r J ti '• r l r ' `I ... r 3 t �� .l ,•y' ' Ivr + Y ' N i• r re 1 L 1 •'fl ; r I 7 - •'� 'r �' I r r I r 1 I ` I r� F Ilk - J ' 1 1 �a r a I'I 'IF rar - 1 I • . r 1 . �r fa• � r I r09 1 i f ■ r r -f 1 ,' rr or If , S FF■ , , � i • f1 •, - l Y7 �f ,� LJ 1 , -�LM1ir �• - - 1 � v ■ 1 1 f t L y 1 , 5 1 If � LP 4.11 1si r Sr R 1 v • - r%.. Si• - r rF 11 +r pPI nyY -39' - J •� : 1 ti ��• � r r z � A+ �6 _ 1 •- v 1 r % 1 Ja zf 1 r - L 6 ` r -- r 1 ' 7f M 7 1 r:- r f L �ru -- M J +� v , 1 16 R` ' V . — i— r. - �� { 1 r T 1• iM11111111111 r iris .-I • rste r + Pa rt n E i I! �-�-�•T•� Fal �_ , v� f I 1 3i 7 J r l F P N J f i , r 'P n t" 9 , ! r v } p i - h 1- k J , _ .. ,f' - - - ! � 'y�{� � - :f- - - � r•t� -. ? •` I �� 'i''. ,r, ;r � 14 S � rl. _ - r r _ L r • '1yR' -F S ' � r• r 'rT al. G 4� 1r F inRX ��.•3 ����s � �- yam" �i l'• ... 1 � R' ••J ot tO -,e A,' JI / + W1 14 i Ll u 7 1 lk �k- J R Pk : 'S' ] 1 T _ t � :I,• 7 JF 1 I �4• IS + r`'0 �' lir ` J r ;`moi r ,f J �,�, -� } r - J • ,I�I fi,�• ! ' - �I` `, I �1"Jx,.l _ 1 1 ''�,�!! r �.T -;� -+J14 'f' 5 ''1 , ,, II "•i' it i I k I� ll'I �� l,ll � 1-.{': ' r r/h'} �4J■ �•�%! / ` - `�1 4'r 1 F 14 � I � � I til fin` � ' - � .,C,•� 1 �A°/�//ff%% . `•� 1 � s!'�1 lyd'�i1'{1 I'I!1 'j�� ''l�S I� 4 'r r� y�� � � \ i,� �,�����*y�� iJ 1 � '�i'{1 �' 4 i' ♦ ,a I I i. If 1 �::?'klr �{/` 1 4' ••li'. `�� � __ ' , 5 ti '!� J 14, I' { kL `�-r Yr1►i. �r2 1• �-Yr , t' i . _ _, +� _ 1. �; ' Sal: ' "� 1. '�.P I ,A. �t - �' • , ', rF L air L `1` y1 s PT, L t �'Sti, 1 Ill rYc�� � -. jVk='`��-:. _ :L �}, w� �fLJ I �:•f r• i� � � �1• 00, - I f I fo ; + r _ . e*1�Ik5 t.'C.L ' F X �J 3 P, I[- : • r F l L � L-. { •4 v L • r� u• a�L.aFht • f � J - � � - i' - r r I' r • - 1 - L ' r .5 't rk * ref 1 .• •J ` '•.{Lal ,rq �.'• �1 � • r J ti '• r l r ' `I ... r 3 t �� .l ,•y' ' Ivr + Y ' N i• r re 1 L 1 •'fl ; r I 7 - •'� 'r �' I r r I r 1 I ` I r� F Ilk - J ' 1 1 �a r a I'I 'IF rar - 1 I • . r 1 . �r fa• � r I r09 1 i f ■ r r -f 1 ,' rr or If , S FF■ , , � i • f1 •, - l Y7 �f ,� LJ 1 , -�LM1ir �• - - 1 � v ■ 1 1 f t L y 1 , 5 1 If � LP 4.11 1si r Sr R 1 v • - r%.. Si• - r rF 11 +r pPI nyY -39' - J •� : 1 ti ��• � r r z � A+ �6 _ 1 •- v 1 r % 1 Ja zf 1 r - L 6 ` r -- r 1 ' 7f M 7 1 r:- r f L �ru -- M J +� v , 1 16 R` ' V . — i— r. - �� { 1 r T 1• iM11111111111 r iris .-I • rste r + Pa rt n E i I! �-�-�•T•� Fal �_ � } p - fes• , _ .. ,f' - - - � 'y�{� � - :f- - - � fir' -. ? •` I :: � ' •�!/' ^; � r _ - .+ __ _ .. - ry _- •iia. - S � rl. _ - r r _ L r • '1yR' -F S ' � r• r 'rT al. G 4� 1r F inRX ��.•3 ����s � �- yam" �i l'• ... 1 � R' ••J ot tO -,e A,' JI / + W1 14 i Ll u 7 1 lk �k- J R Pk : 'S' ] 1 T _ t � :I,• 7 JF 1 I �4• IS + r`'0 �' lir ` J r ;`moi r ,f J �,�, -� } r - J • ,I�I fi,�• ! ' - �I` `, I �1"Jx,.l _ 1 1 ''�,�!! r �.T -;� -+J14 'f' 5 ''1 , ,, II "•i' it i I k I� ll'I �� l,ll � 1-.{': ' r r/h'} �4J■ �•�%! / ` - `�1 4'r 1 F 14 � I � � I til fin` � ' - � .,C,•� 1 �A°/�//ff%% . `•� 1 � s!'�1 lyd'�i1'{1 I'I!1 'j�� ''l�S I� 4 'r r� y�� � � \ i,� �,�����*y�� iJ 1 � '�i'{1 �' 4 i' ♦ ,a I I i. If 1 �::?'klr �{/` 1 4' ••li'. `�� � __ ' , 5 ti '!� J 14, I' { kL `�-r Yr1►i. �r2 1• �-Yr , t' i . _ _, +� _ 1. �; ' Sal: ' "� 1. '�.P I ,A. �t - �' • , ', rF L air L `1` y1 s PT, L t �'Sti, 1 Ill rYc�� � -. jVk='`��-:. _ :L �}, w� �fLJ I �:•f r• i� � � �1• 00, - I f I fo ; + r _ . e*1�Ik5 t.'C.L ' F X �J 3 P, I[- : • r F l L � L-. { •4 v L • r� u• a�L.aFht • f � J - � � - i' - r r I' r • - 1 - L ' r .5 't rk * ref 1 .• •J ` '•.{Lal ,rq �.'• �1 � • r J ti '• r l r ' `I ... r 3 t �� .l ,•y' ' Ivr + Y ' N i• r re 1 L 1 •'fl ; r I 7 - •'� 'r �' I r r I r 1 I ` I r� F Ilk - J ' 1 1 �a r a I'I 'IF rar - 1 I • . r 1 . �r fa• � r I r09 1 i f ■ r r -f 1 ,' rr or If , S FF■ , , � i • f1 •, - l Y7 �f ,� LJ 1 , -�LM1ir �• - - 1 � v ■ 1 1 f t L y 1 , 5 1 If � LP 4.11 1si r Sr R 1 v • - r%.. Si• - r rF 11 +r pPI nyY -39' - J •� : 1 ti ��• � r r z � A+ �6 _ 1 •- v 1 r % 1 Ja zf 1 r - L 6 ` r -- r 1 ' 7f M 7 1 r:- r f L �ru -- M J +� v , 1 16 R` ' V . — i— r. - �� { 1 r T 1• iM11111111111 r iris .-I • rste r + Pa rt n E i I! �-�-�•T•� Fal �_ TANTAU 14 TREE SCHEDULE TANTAU 14 TREE AND PLANT SCHEDULE CALABAZAS CREEK RIPARIAN AREA Notes: 1. All plants within 50 feet of the creek shall be local natives to protect the genetic integrity of the Clalabazas Creek Riparian Corridor. Contractor to document source of seeds. 2. See ground cover plan L9.01 for locations of planting zones. 3. Landscape Contractor shall verify all quantities and notify Landscape Architect in writing of any discrepancies between the plans and the schedules prior to bid submission. 4. Shrubs shall be planted first followed by Grass and Forb Plants planted in order of the highest percentage to the lowest percentage to preserve the design intent of the Landscape Architect. 5. Landscape Contractor shall provide a typical layout for each planting zone at sufficient size to demonstrate understanding of the planting notes for approval by the Landscape Architect. 6. Plant mixes shown in schedule for bid purposes. Final plant mixes are subject to client approval. 7. All plants to be local natives from the Calabazas Creek Watershed or immediately adjacent watersheds. Contractor to document source of seeds or vegetative propagules. 8. Since Jannuary, District (SCVWD) staff learned that many species are vulnerable to Phytophtora. Previously, we asked for only two of the most well known hosts, Toyon and Coffeeberry to be tested. Now, District (SCVWD) would prefer and like to request that a small subset of each species being planted in Th e50 fleet creek setback be tested for Phytophtora and provide us with a lab submittal showing negative results. 9. Plant Species under review. CODE Latin Name Notes: Provided by Owner Quantity Size Notes CANOPY TREES 10% 1. Plat Species under review Carex pansa Pacific Dune Sedge JUHI Juglans hindsli Northern California Walnut 6 2. Trees provided by owner. Owner and/or Landscape Architect to select trees for project from stock at Owner -Contracted -Nursery and provide information to Contractor. PRLA 24 Platanus racemosa California Sycamore CODE Latin Name Common Name Provided by Owner Quantity Size Nates CANOPY TREES PERENNIALS QUAG-L Quercus agrifola 41 8 24" box OLEA 72 oleo europea 'Swan Hill' Swan Hill Fruitless Olive 29 60" box CA native PRLA 96 Platonus racemose California Sycamore 2 48" box AECA Aesculus californica PRLA 24 Platanus rocemoso California Sycamore 10 24" box 40% CONIFERS EschsCholzia californica var. maritima CA Poppy 49 California goldenrod 20% CFAT 48 Cedrus atlantica Atlas Cedar 24 48" box 1 gal. CEATGL36 Cedrus atlantica 'Glauca fastigiato' Atlas Cedar 25 36" box 48" O.C. DECIDUOUS OAKS Aster 20% 60 48" D.C. Pteridium aquilinum QUCAS Quercus castaenifolia Chestnut Leaf Oak 40 24" box QUSH Quercusshumardii Shumard Red Oak 20 36" box 20% EVERGREEN OAKS 36" O.C. Leymus triticoides 45 40% 2" plug QUECA Quercus virginiana 'Cathedral' Southern Live Oak 24 48" box 36" O.C. QUECA Quercus virginiana'Cathedral' Southern Live Oak 2 60" box QU RU Quercus rugosa Netleaf Oak 13 24" box UNDERSTORY TREES 6 PRLY OS Prunus Iyonil Catalina Cherry 6 5 gallon Space G'Cl per plan FEATURE SHRUBS 174 POMA Padocarpus Mucrophyllus vor. Maki Japanese Yew 174 24" box Space 4'0,C., per plan TANTAU 14 TREE AND PLANT SCHEDULE CALABAZAS CREEK RIPARIAN AREA Notes: 1. All plants within 50 feet of the creek shall be local natives to protect the genetic integrity of the Clalabazas Creek Riparian Corridor. Contractor to document source of seeds. 2. See ground cover plan L9.01 for locations of planting zones. 3. Landscape Contractor shall verify all quantities and notify Landscape Architect in writing of any discrepancies between the plans and the schedules prior to bid submission. 4. Shrubs shall be planted first followed by Grass and Forb Plants planted in order of the highest percentage to the lowest percentage to preserve the design intent of the Landscape Architect. 5. Landscape Contractor shall provide a typical layout for each planting zone at sufficient size to demonstrate understanding of the planting notes for approval by the Landscape Architect. 6. Plant mixes shown in schedule for bid purposes. Final plant mixes are subject to client approval. 7. All plants to be local natives from the Calabazas Creek Watershed or immediately adjacent watersheds. Contractor to document source of seeds or vegetative propagules. 8. Since Jannuary, District (SCVWD) staff learned that many species are vulnerable to Phytophtora. Previously, we asked for only two of the most well known hosts, Toyon and Coffeeberry to be tested. Now, District (SCVWD) would prefer and like to request that a small subset of each species being planted in Th e50 fleet creek setback be tested for Phytophtora and provide us with a lab submittal showing negative results. 9. Plant Species under review. CODE Latin Name Common Name Provided by Owner Quantity Size Notes CANOPY TREES 10% 25 Carex pansa Pacific Dune Sedge JUHI Juglans hindsli Northern California Walnut 6 24" box 94% plug PRLA 24 Platanus racemosa California Sycamore 19 24" box EVERGREEN OAKS S Either size acceptable pending availability. Plant in center of plant beds in linear groups of 9-20 between i8l, trees. Confirm placement with Landscape Architect in Field. PERENNIALS QUAG-L Quercus agrifola Coast Live Oak 8 24" box Plant tightly in a diagonal spaced row FEATURE SHRUBS 15 Pincushion flower CA native HEAR Heteromeles arbutifolia Toyon 15 24" box 18" plant in groups of 5's and 9's towards edges of plant bed AECA Aesculus californica California Buck 12 24" box GROUND COVER MIX 1- FERNS/PERENNIALS (hatch not yet shown on plans) 40% 1 gallon EschsCholzia californica var. maritima CA Poppy Solidago californica California goldenrod 20% 1 gal. 48" O.C. Scrophularia californica Califronia bee plant 20% 1 gal. 48" O.C. Dryopteris arguta Coastal Wood Fern 20% 1 gal. 48" O.C. Aster chilensis Aster 20% 1 gal. 48" D.C. Pteridium aquilinum Braken Fern 20% 1 gal. 36" O.C. GROUNDCOVER MIX 2 - GRASSES (hatch not yet shwn on plans) Carex spp (local natives only) Sedges 20% 1 gal. 36" O.C. Leymus triticoides Creeping Wild Rye 40% 2" plug 12" O.C. Deschampsia californica Tufted Hair Grass 20% 1 gal. 36" O.C. Muhlenbergia rigens Deer Grass 10% 1 gal. 6'0,C. O 1 Planting Schedules Over seed with seed mix (mix tbd) Over seed with seed mix (mix tbd) Over seed with seed mix (mix tbd) TANTAU 14 UNDERSTORY PLANT SCHEDULE Notes: 1. Plant material to be provided by contractor and supplied by a nursery source that has been approved by both Landscape Architect and Project Horticultural Team. Submit list of nurseries for review and approval. 2. Contractor to submit seed sources, date of collection, date of packaging, average PLS/Ib data for this source per specification section 329200. 3. Plugs to be in 2" depth trays. 4. Total percent cover exceeds 100% in some cases as plantings will be intermixed and overseeded. Provided by Min Name Common Name Native Bloom Color Bloom Time Owner % Size O.C. Spacing Notes NATIVE LAWN AT STREETSCAPE GRASS PLANTS 10% 1 gallon 24" plant woven throughout in groups of 3-5's, placed along diagonals Sisyrinchium bellum Blue Eyed Grass CA native purple 10% 4" pot Carex pansa Pacific Dune Sedge CA native 94% plug 12" Festuca mairei Atlas Sedge SHRUBS 50% 4" pot or 1 gallon Either size acceptable pending availability. Plant in center of plant beds in linear groups of 9-20 between i8l, trees. Confirm placement with Landscape Architect in Field. PERENNIALS Rosmarinus officinalis 'Tuscan Blue' Flowering Rosmary X 100% 1 gallon 24" Plant tightly in a diagonal spaced row GRAVEL MULCH 1.0O% of total area Scabiosa Butterfly Blue Pincushion flower CA native lavendar Spring to Fall 12% 4" pot 18" plant in groups of 5's and 9's towards edges of plant bed WILDFLOWER OVERSEED MIX 40%oftotal area Seed Rate 40% 1 gallon EschsCholzia californica var. maritima CA Poppy CA native yellow/orange Spring 2 pls lbs / acre Seed rates adjusted. Broadcast by hand in drifts 20-30 feet long of, ranging from 2-6' widths. Gilia tricolor Bird's Eyes CA native Light Violet Blue Spring 0.5 pls lbs / acre Vary rate of seed application to get natural effect of some densely seeded Lasthenia glabrata Goldfields CA native Dark Violet Blue Spring 0.3 pls lbs / acre areas and some [lightly seeded areas. 3" Depth of Redwood Chip Mulch as provided by American Soil & Stone Products, Size range 1" to 11/2 ". COMPOST MULCH 2.8 total pls Ibs / acre 1/2" Depth of Landscape Compost as provided by Zanker Landscape Materials. NATIVE LAWN BENEATH OLIVE TREES GRASS PLANTS Carex pansa Pacific Dune Sedge CA native 94% plug 12" GRASS SEED MIX 100% of total area Seed Rate Festuca idahoensis 'Tomales Bay' Blue Fescue CA native 20 pls lbs / acre Festuca rubra'Molate' Red Creeping Fescue CA native 10 pls lbs / acre PERENNIALS Iris tenax Iris 81/16 1 gallon 24" Iris douglisiana Iris 5% 1 gallon 24" BULBS Triteleia "Queen Fabiola" Tr[tele[a COMPOST MULCH 100% of total area 1/2" Depth of Landscape Compost as provided by Zanker Landscape Materials. BMP PLANTING 3% bulb 6" GRASS PLANTS Juncus effusus Soft Rush CA native 20% 4" pot 24" at bottom of Swale Juncus patens California Gray Rush CA native 60% 4" pot 24" plant in zig zag at bottom of swales, place Juncus plants first PERENNIALS Iris douglasiana 'Canyon Snow' Iris Native cultivar white 10% 1 gallon 24" plant woven throughout in groups of 3-5's, placed along diagonals Sisyrinchium bellum Blue Eyed Grass CA native purple 10% 4" pot 18" plant woven throughout in groups of 3-5's, placed along diagonals COMPOST MULCH 100% of total area 1" Depth of Landscape Compost as provided by Zanker Landscape Materials. See specification for product requirements. STAIRWELL/ ELEVATOR PLANTING BORDER SHRUBS Rosmarinus officinalis 'Tuscan Blue' Flowering Rosmary X 100% 1 gallon 24" Plant tightly in a diagonal spaced row GRAVEL MULCH 1.0O% of total area 2" Depth of Aggregate Mulch to match adjacent pavement - TBD. LOW EVERGREEN GROUNDCOVER AT PARKING LOT SHRUBS Arctosphaphylos 'Emerald Carpet' X 40% 1 gallon 24" Arctosphaphylos edmundsii X 60% 1 gallon 24" PERENNIALS Iris douglasiana 'Canyon Snow" 20% 1 gallon 36" plant placed in groups of 3-5's, along diagonals at edges of BMP areas ORGANIC MULCH 100% of total area 3" Depth of Redwood Chip Mulch as provided by American Soil & Stone Products, Size range 1" to 11/2 ". General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All dimensions shall be verified on site before proceeding with the work. 4. OLIN shall be notified in writing of any discrepancies. 5. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review DB Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. Pruneridge Avenue Fr-/ F— I_ ami Q c� c c� H NN z C_) Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Planting Schedule Project No. Date Scale at Arch E1 1738 01/31/2018 NTS Number Revision P-TA14-4.34 00 N 0 0 0 0Materials�I Plan I1" = 40'-0" C0 0 0 i \ I I START OF CONCRETE WITH WATER REPELLENT. 0 �� II SII I� CIP CONCRETE SIDEWALK PER PACKAGE 3 CIVIL DWGS. o - �PRUNERIDGE AVENUE �x BENCH. a I r U O U O U I \ Ll START OF CONCRETE - WITH WATER REPELLENT. I� J \ \ LEGEND - - PROPERTY LINE SETBACK LINE PLANTING STABILIZED AGGREGATE PERMEABLE PAVING, SEE 1 & 2/L8.00 LLLLLLLLLL CONCRETE PAVING WITH WATER LLLLLLLLLL REPELLANT - SIDEWALK LLLLLLLLLL LLLLLLLLLL I 1 /L8.00 DETECTABLE WARNING PAVERS COBBLE STRIP NOTES: 1 SEE L4.10 FOR PAVING JOINT LAYOUT. 0 20' 40' 80' General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All dimensions shall be verified on site before proceeding with the work. 4. OLIN shall be notified in writing of any discrepancies. 5. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review DB Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. Pruneridge Avenue Fc -/i F_ ai JI _JI c m Q CU c H N z O Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Materials Plan Project No. Date Scale at Arch E1 1738 01/31/2018 111=401-011 Number Revision P -TA -14-4.40 00 N 0Plantin I1" = 40'-0" STABILIZED AGGREGATE PERMEABLE PAVING NTS Palette 2 CONCRETE SIDEWALK NTS 3 PLANTING AT BUILDING FACADE/PEDESTRIAN WALKWAY NTS General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All dimensions shall be verified on site before proceeding with the work. 4. OLIN shall be notified in writing of any discrepancies. 5. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review DB Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. N z O Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com Pruneridge Avenue © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Landscape Materials References Project No. Date Scale at Arch E1 1738 01/31/2018 NTS Number Revision P -TA -14-4.41 00 N O O O O O O ° O 01 Site Lo ighting Diagram LEGEND 000 • _ I 4N v O U O O a •O• 'O' •O• I '_i •O• •O• U u — — PROPERTY LINE O I O 00 O I O O a o I SETBACK LINE o 0 0 _ o O ,, O - - - - PEDESTRIAN BOLLARD ° . . . O ---- — 4 O O O O O O O O O O �I---------- FEATURE LIGHTING AREAS • pOhiO� O _ - POLE LIGHTING NOTES: O 1. GRAPHIC TYPOLOGY DIAGRAM ONLY. 000 PRUNERIDGE AVENUE NOT INDICATIVE OF FIXTURE SPACING —/ COUNTS. O O ---------___ _ - _- - - - - - - - - - a � ° ° ° ° ° ° ° ° ° . � __________________ ____ i ' � O ALL FIXTURES TBD. 00 ' DOO0�°°° °° o O O O'------------------------------------------------------------------------ -' O 0 O t ; ;--------- - O ' 0 0 0 0 �; 0p I , i, O0IT� II I I OOII _ 0 0. I O ° O� T— �O o 0 0 0 ; i I � II I I 0 0 0 0 ; II I I ' I o 00 Ii ' 0 0 0 O ; I''--- ' 0 II • O O o ;�t� ��t • o o _ ' M ° ° I _— O 0 - 0 o I ; ° • O _' ° III ° __ w O � o II I O z 'I o w . a > -� Q ° o O Q o 0 0 0 O O a ; ° .000 � O C O o 0 o -O � 'I I ° 0 0 0 0 — ° �� . �. O I ;I 0 0 0 0 0 0 14 O ------- o O 0 . 000 O 00 o 0 0 0 ,r O Oo i� r • 0 o 4 i � i � O A o ' O 1° .02 o i 0 O CREEK GO 9001 / ACCESS �� O • O GATE PtiPsc� � O /i O 0�- � O O O x O 00 I , O O O O . O O �� I 0 20' 40' 80' General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All dimensions shall be verified on site before proceeding with the work. 4. OLIN shall be notified in writing of any discrepancies. 5. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review DB Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. O Pruneridge Avenue O Q CU N z O Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Site Lighting Diagram Project No. Date Scale at Arch E1 1738 01/31/2018 111=401-011 11=40'-0" Number Revision P-TA14-4.50 00 l 11 BICYCLE RACK - BOLA SERIES NTS e.! ZASH URN - HUMID SERIES 3 LITTER BIN - LANDSCAPE FORMS CUSTOM NTS I NTS 4 BENCH - LANDSCAPE FORMS CUSTOM cJ NTS 7 FEATURE LIGHTING NTS BOLLARD LIGHTING - NERI CUSTOM NTS F-1 6 LIGHTPOLE - NERI CUSTOM NTS General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All dimensions shall be verified on site before proceeding with the work. 4. OLIN shall be notified in writing of any discrepancies. 5. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review DB Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. N z O Pruneridge Avenue Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Site Furnishings References Project No. Date Scale at Arch E1 1738 01/31/2018 NTS Number Revision P-TA14-4.60 00 1 1 1 1 � e � •;� '� • tie � ., � � �- � r i ► � 1 IN Pw a i 114 if 44 -16 ^!+ ,ate jl{ , L. 't �• 4 *dg ,��'4 ; - .• . 1' �' y `O x 2N • � � _ + ,- � � "� ,y aFP -� � � ` _ 1 ; , 4 _ � IV �k �''� 1 � � Wit• - �~ F=_ I ' ' - � � ''.� � •'�_r � - ��ti� y •.lfR 'fir ++ " ': =^i a . , ��_ +1• • - f 4a� ���- `�'� j,� ��.. - .r [,.+Ifj� � .t!�l -y Lam,,' .,.. ``yam � + �•�� �� � i 4 -' ,� �' ,� � f �f r` �i! • � ! \ y � +n:~S'� .�,+ N�,f i,'. � `� �,` � ���'rs �' ,! rr• .1 V � `' r� �r fi� ! ' Tj- +: � `.-`�+ � .�•� � �{� � , "fT.�_V , _ 4� tyy�� P - V�\•- A4i 1 _ aF1 ' 11+ �__ •fl.�_t•�� r.. `T�,777`., �.+. �..i+� ��r '..� ��' ai��e 'fla 1� �T I�..r• � • _1w �� 1 � 1,{�� Ir ��� �� 1 •� ` r -.� v-y�- h". 'a'ti 'r• �k� �f i) • .i`�-� q �A+ ,�,�ty 's - ~'�. _ '�� .� i ��` i , ;• .r \.�L- .I \ . 1Y ` � - , f '� '.' 1-.� ,� • J 13 a ILI K .. ` \ �r t _ r it - ,', • � 1 �` F ' t � i •, 1 ,fk.. 1 - � ` a���- ` •,rte . " � , .� � s �'+T .`: I ; _^��' � �.. � ^�y1� b �r_ , •M .� � . 1 ,���i; -\ i\ ` t i �r.'1 ++" •i ?� �• P � _ . ` • � �r ',� +�. ..� -- v � �- �` ,� r � ..• ,�r. •` - ;�__ -�Ny' � ._� -i` - \tom � �� 1 y :� •M + •� •may' �, .�'��;*,li r`. .�' !`� li s1 r1► It" �{(r • • MEI 0I*4 V.,111= N 11 SECTION - PRUNERIDGE PLAZA TIRED WALLS 1/4" = 1'-0" OLIVE GROVE PLAZA, STABILIZED AGGREGATE PERMEABLE PAVING. PLANTING BED PLANTING SOIL RETAINING WALL, TYP TRENCH DRAIN PEDESTRIAN WALKWAY Z 1 SECTION - PARKING LOT TREE PITS 3/16" = V-0" O1 Site Sections 1" = 40'-0" General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All dimensions shall be verified on site before proceeding with the work. 4. OLIN shall be notified in writing of any discrepancies. 5. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review DB Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. N z O Pruneridge Avenue Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Site Sections Project No. Date Scale at Arch E1 1738 01/31/2018 As noted Number Revision P-TA14-4.80 00 Architecture -Office OUTLINE OF TANTAU 14 OFFICE ABOVE GRADE PROPERTY LINE O � Lever B03 ....0060 1 --- 1 I 1 CD SPACE ' TBC 0o 1 1 a o c � 1 N 1 I 1 24'-0" 1 bo bo 1 M 1 1 I - 1 CD I � 1 N 1 I 0 1 SPACE 00 TBC X � 1171 / 1 I w, zlJ AIR INTAKE 1 SHAFT #3 w Level 133 Parking Stall Calculations Gross Floor Area: 63,756 sf 139 Standard Parking Stalls (8'-6" x 18'-0") 00 � Accessible Parking Stalls (9'-0" x 18'-0") 08 Electric Vehicle (EV) Charging Stalls 00 Accessible & EV Charging Stalls 08 � Carpool Stalls 155 TOTAL ON General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All levels are in feet and inches unless noted otherwise. 4. All dimensions shall be verified on site before proceeding with the work. 5. Foster + Partners shall be notified in writing of any discrepancies. 6. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review Rev. Date Reason For Issue PLANNING APPLICATION Key Plan. N O a� _ N a' M C M .. Pruneridge Avenue F+P Chk Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Plan View Level B3 Project No. Date Scale at Arch E1 2193 01/31/2018 111=201-011 Number Revision P-TA14-5.00 00 OUTLINE OF TANTAU 14 OFFICE ABOVE GRADE % � PROPERTY LINE SHAFT #1 O �I Level B02 ...0060 General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All levels are in feet and inches unless noted otherwise. 4. All dimensions shall be verified on site before proceeding with the work. 5. Foster + Partners shall be notified in writing of any discrepancies. 6. Any areas indicated on this sheet are approximate and indicative only. � 1 - 1 1171 N I 1 CD LSPACE0o 1 1 1 00 01/31/2018 Planning - Site & Architectural Review F+P N 1 Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. 24'-0" 1 Pruneridge Avenue CD I -� O bo 1 00 N cM 1 I I 1 I I I - 1 I I N CD m 1 � I Z z � � rnir I z 1 Foster + Partners JI> 1000 Samsome Street AIR INTAKE 1 Suite 240 SHAFT #3 LUI San Francisco, CA 94111 O 1 T 408 610 5800 aJ www.fosterandpartners.com © Foster + Partners 2017 Level 132 Parking Stall Calculations Gross Floor Area: 63,756 sf 152 Standard Parking Stalls (8'-6" x 18'-0") 00 � Accessible Parking Stalls (9'-0" x 18'-0") 08 Electric Vehicle (EV) Charging Stalls 00 Accessible & EV Charging Stalls 10 � Carpool Stalls 170 TOTAL ON OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Plan View Level B2 Project No. Date El 2193 01/31/2018 S1 at A20' 0" Number Revision P-TA14-5.01 00 , loom Men — — — — — Mennen, demeans demeans Canaan, Canaan, �lmo-Mum a, ....0040 '01 Mumma me annom an ONNOM an Gunn* me Gunn* an Mumma . Gunn* am Game. . commm 01, enema -ft enema 01, --am 6, Mumma 6, Mumma 4, AS 40 ....Noow ....Noow ....,a do ,Mom do ."00 do ..,ODMIR OUTLINE OF TANTAU 14 OFFICE ABOVE GRADE 01 Levels B01 Gross Floor Area: 52,698 sf ON PROPERTY LINE SHAFT #1 � 1 --- 1 _ I 1 i M 1 1 a o c � 1 N 1 I 1 24'-0" 1 ' O bo00 1 M � 1 I 1 o I � 1 N 0 1 I n,\ oo 1 rT- / I w, zlJ AIR INTAKE F— a- SHAFT 1 SHAFT #3 w a- Level 131 Parking Stall Calculations 86 Standard Parking Stalls (8'-6" x 18'-0") 06 � Accessible Parking Stalls (9'-0" x 18'-0") 16 Electric Vehicle (EV) Charging Stalls 02 Accessible & EV Charging Stalls 14 � Carpool Stalls 124 TOTAL General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All levels are in feet and inches unless noted otherwise. 4. All dimensions shall be verified on site before proceeding with the work. 5. Foster + Partners shall be notified in writing of any discrepancies. 6. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review Rev. Date Reason For Issue PLANNING APPLICATION Key Plan. N O C Pruneridge Avenue F+P Chk Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Plan View Level B1 Project No. Date Scale at Arch E1 2193 01/31/2018 111=201-011 Number Revision P-TA14-5.02 00 0 ♦ o us ME ON 01 -TA14-5.2 (E) FIRE HYDRANT PROPERTY LINE I 15' FRONT SETBACK 0 C) �- ° O O7 O N , 0 0 O O OFFICE OL FFL 0'-0" AMSL FFL (+161'-0") O O 03 01 02 NORTH TANTAU AVENUE -TA14-5. P-TA14-5.20 P-TA14-5.10 10 FIRE HYDRANT (E) AT&T VAULT 41 PROPERTY LINE ---- VTA BUS PUBLIC UTILITY EASEMENT ° - SHELTER o --- -- FDC �Z/� �Z/� �L/� �L/ BACKFLOW r �� �� �� 15' FRONT SETBACK -- 0 0 �a—�-, ° O c 0 0° o° o° o° o° o° ° ° `7 r r j %Np 40 anumm 40 �40��—_-_ 1 /�Jv _ �y? =_�i�s �� v T v 5 �� v ) �� v Ol) 1�� ~ ~ ~ v �� --- �i L/ ti �i Z/ �i L/ �i L/ �i L / �i JL_ 1 � I BIK RACKS � o z� � Z� (E)TRAFFIC BIKE RACKS �'%� O O O O O O -- -------------- o° - CTR 00 � � oo � � 0 0 �r Zr Zr � � �o � 0 � o0 �� ° L EQUIP. r �r i r �/ 10 77 O O O O O O O O O O O 1' !� ° FFL 0'-0" 17 AMSL FFL (+161'-0°) PROJECT BENCHMARK �' SLI TL L SITE WALLS DRY MAIL SERENITY Z Z Z GRID 01-2 WITH A-02 CLEANING ROOM ROOM T.B.C. 0 1 oo o ROOM N 9378' - 1 15/32" r r r E 12007 15/16" STAIR O #2 /X\ L I I / 101 X O � O ST31R 02 X 0 1o° FF OFFICE r r r P-TA14-5.20 OgL FFL 0'- 0" 2J 2 Z 101 AMSL FFL (+161-0") o ° I 101 1up / IX (B % Li I O O O \1�ry ALL GENDER BATHROOM DN S ` P-TA14-5 10 498 RECEPTION Q uP [ ] `n FFL 0' - 0" • AMSL FFL (+161'-0") O OUTLINE OF TANTAU 14 PARKING STRUCTURE BELOW GRADE, SHOWN DASHED — « O O L NOTE: 150' INTERIOR SIDE SETBACK FROM PROPERTY LINE (NO BUILDINGS TALLER THAN 16'-0") O O O m WOMEN'S BATHROOM MOTHER J ELEC. ELEC. RM. RM. 0 O° r v t o 5 O° sl s om - Carpool Stalls (CP) - 5% TOTAL 600 ROOM —I w Jtl'IrN= CD V V o °1 N I ITELECOM MEN'S BATHROOM JC w 4QL. ROOM I I FIRE RISLi � O ST31R 02 X 0 1o° FF OFFICE r r r P-TA14-5.20 OgL FFL 0'- 0" 2J 2 Z 101 AMSL FFL (+161-0") o ° I 101 1up / IX (B % Li I O O O \1�ry ALL GENDER BATHROOM DN S ` P-TA14-5 10 � w w ✓ w ✓ w w w w w w 1 Iw w w w ✓ ✓ L_ \_Jw w w w w wI A r v S\ r V S\ v S� LULU ____ z1 z LU ° ° Q LLJ v v \ v U' o � o o � o �, o � -I' o 0 00 0° o° O O - O - O �O � J WAN LU ' �,�,s o° a° SIS °° 9 STALLS 6 STALLS `,i 3 STALLS^� 488' - 0" 3 STALLS 6 STALLS ^� - 6 STALLS 4 STALLS _ 1 ' - 0" RAMP UP520' - 0" RAMP UP _' J T.O.P. 16'-0" A.F.G. N_ o° TRANSFORMER BAILER SERVICE YARD PARKING STRUCTURE 1 S S r v � EGRESS STAIR #1 3 STALLS � , 6 STALLS r v , 6 STALLS 6 STALLS 6 STALLS _ , 5 STALLS � v , `� � L LOUVERED v� r v s v� QG�G�y SERVICE YARD 'r IEV EV EV EV EV EV--' EV EV EV EV EV EV < o° o° Z�z Uo° DN 0 0 S 0 DN F -1F-I I 1 KID C I � XX C I � X} C _ I —'i. T,i C _ � �=1 - co o 24'-0" r Z r ? r r J o° 5 O O O O 1 EV EV EV EVEV EV EV EV EV EV EV EV s - OI I n _r\ I _ 1 Eel PROPERTY LINE O � 01 Level 01 I1" = 20'-0" Gross Floor Area: 42,741 sf SWITCH cOMPACTORs - 3 STALLS 6 STALLS 6 STALLS 6 STALLS 6 STALLS 5 STALLS GEAR = O _ N I 0 Oko RAMP DN OT.O.W. 3'-7" A.F.G. 04 0 1 ,� EGRESS STAIR WALL PARKING STRUCTURE T.O.W. 3'-7" A.F.G. ' TO LEVEL B1 N EGRESS STAIR #2 EGRESS STAIR WALL \ -r P-TA14-5.20 N 1- W NOE6 STALLS, 6 STALLS 6 STALLS - 6 STALLS 6 STALLS,- 4 STALLS 5 STALLS j i� 1WW RAMP WALL o o W00 w v) U)w 25' REAR SETBACK \--- - --- 1 Q — 0 0 ° - - - o � _ o _ o151-011 " W o 25' REAR � 15 -0 z SETBACK Note: Elevations inside (XXX' -X") are based on project benchmark. OUTLINE OF TANTAU 14 PARKING STRUCTURE BELOW GRADE, SHOWN DASHED 498 RECEPTION Q uP [ ] `n FFL 0' - 0" • AMSL FFL (+161'-0") O OUTLINE OF TANTAU 14 PARKING STRUCTURE BELOW GRADE, SHOWN DASHED — « O O L NOTE: 150' INTERIOR SIDE SETBACK FROM PROPERTY LINE (NO BUILDINGS TALLER THAN 16'-0") O O O 60 o° 1 5 r v s v 0 O° r v t o 5 O° sl s 30 Carpool Stalls (CP) - 5% TOTAL 600 CD °1 N LLIO � w w ✓ w ✓ w w w w w w 1 Iw w w w ✓ ✓ L_ \_Jw w w w w wI A r v S\ r V S\ v S� LULU ____ z1 z LU ° ° Q LLJ v v \ v U' o � o o � o �, o � -I' o 0 00 0° o° O O - O - O �O � J WAN LU ' �,�,s o° a° SIS °° 9 STALLS 6 STALLS `,i 3 STALLS^� 488' - 0" 3 STALLS 6 STALLS ^� - 6 STALLS 4 STALLS _ 1 ' - 0" RAMP UP520' - 0" RAMP UP _' J T.O.P. 16'-0" A.F.G. N_ o° TRANSFORMER BAILER SERVICE YARD PARKING STRUCTURE 1 S S r v � EGRESS STAIR #1 3 STALLS � , 6 STALLS r v , 6 STALLS 6 STALLS 6 STALLS _ , 5 STALLS � v , `� � L LOUVERED v� r v s v� QG�G�y SERVICE YARD 'r IEV EV EV EV EV EV--' EV EV EV EV EV EV < o° o° Z�z Uo° DN 0 0 S 0 DN F -1F-I I 1 KID C I � XX C I � X} C _ I —'i. T,i C _ � �=1 - co o 24'-0" r Z r ? r r J o° 5 O O O O 1 EV EV EV EVEV EV EV EV EV EV EV EV s - OI I n _r\ I _ 1 Eel PROPERTY LINE O � 01 Level 01 I1" = 20'-0" Gross Floor Area: 42,741 sf SWITCH cOMPACTORs - 3 STALLS 6 STALLS 6 STALLS 6 STALLS 6 STALLS 5 STALLS GEAR = O _ N I 0 Oko RAMP DN OT.O.W. 3'-7" A.F.G. 04 0 1 ,� EGRESS STAIR WALL PARKING STRUCTURE T.O.W. 3'-7" A.F.G. ' TO LEVEL B1 N EGRESS STAIR #2 EGRESS STAIR WALL \ -r P-TA14-5.20 N 1- W NOE6 STALLS, 6 STALLS 6 STALLS - 6 STALLS 6 STALLS,- 4 STALLS 5 STALLS j i� 1WW RAMP WALL o o W00 w v) U)w 25' REAR SETBACK \--- - --- 1 Q — 0 0 ° - - - o � _ o _ o151-011 " W o 25' REAR � 15 -0 z SETBACK Note: Elevations inside (XXX' -X") are based on project benchmark. OUTLINE OF TANTAU 14 PARKING STRUCTURE BELOW GRADE, SHOWN DASHED AIR INTAKE EXISTING RESIDENTIAL SHAFT #1 CMU WALL TO REMAIN AIR INTAKE SHAFT #2 AIR INTAKE SHAFT #3 Grade Level 01 Parking Stall Calculations 123 Standard Parking Stalls (8'-6" x 18'-0") 04 Accessible Parking Stalls (9'-0" x 18'-0" 24 Electric Vehicle (EV) Charging Stalls 00 Accessible & EV Charging Stalls 00 Carpool Stalls 151 TOTAL Total Parking Stall Calculations 498 Standard Parking Stalls (8'-6" x 18'-0") 10 Accessible Parking Stalls (9'-0" x 18'-0") 60 Electric Vehicle (EV) Charging Stalls - 10% 02 Accessible & EV Charging Stalls 30 Carpool Stalls (CP) - 5% TOTAL 600 CD °1 N LLIO AIR INTAKE EXISTING RESIDENTIAL SHAFT #1 CMU WALL TO REMAIN AIR INTAKE SHAFT #2 AIR INTAKE SHAFT #3 Grade Level 01 Parking Stall Calculations 123 Standard Parking Stalls (8'-6" x 18'-0") 04 Accessible Parking Stalls (9'-0" x 18'-0" 24 Electric Vehicle (EV) Charging Stalls 00 Accessible & EV Charging Stalls 00 Carpool Stalls 151 TOTAL Total Parking Stall Calculations 498 Standard Parking Stalls (8'-6" x 18'-0") 10 Accessible Parking Stalls (9'-0" x 18'-0") 60 Electric Vehicle (EV) Charging Stalls - 10% 02 Accessible & EV Charging Stalls 30 Carpool Stalls (CP) - 5% TOTAL 600 General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All levels are in feet and inches unless noted otherwise. 4. All dimensions shall be verified on site before proceeding with the work. 5. Foster + Partners shall be notified in writing of any discrepancies. 6. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning -Site & Architectural Review F+P Rev. Date Reason For Issue Chk PLANNING APPLICATION Key Plan. Pruneridge Avenue I I I I I I I I I I I I IJ N z O Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Plan View Level 01 Project No. Date Scale at Arch E1 2193 01/31/2018 111=201-011 Number Revision P-TA14-5.03 00 0 Level 02 1" = 20'-0" Gross Floor Area: 37,301 sf 1� 02 Roof11 = Level ro P-TA1 Mechanical Area: 15,466 sf ON General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All levels are in feet and inches unless noted otherwise. 4. All dimensions shall be verified on site before proceeding with the work. 5. Foster + Partners shall be notified in writing of any discrepancies. 6. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review Rev. Date Reason For Issue PLANNING APPLICATION Key Plan. N O PIA Pruneridge Avenue F+P Chk Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Plan View Level 02 & Roof Level Project No. Date Scale at Arch E1 2193 01/31/2018 111=201-011 Number Revision P-TA14-5.04 100 TOW 39' -1" MECH.SCREEN TOP 31'- 2 1/2" FFL 16'- 10 1/2" V LEVEL 02 VTA BUS SH FFL0'-0" V LEVEL 01 N. TANTAU AVE. v----------------- / / / OFFICE SSL -20' -11" LEVEL B01 - PARKING STRUCTURE SSL -31'- 5" y LEVEL B02 - PARKING STRUCTURE SSL 41'- 11 " LEVEL B03 - PARKING STRUCTURE 01 Cross Section at Building Core 02 Typical Cross Section 1" = 20'-0" 1" = 20'-0" I LJCl/�U-r [•CTDA/%I/ /\AAV 1 Z U 0 Z J Q J ri mi Of ri 03 Longitudinal Section 1" = 20'-0" General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All levels are in feet and inches unless noted otherwise. 4. All dimensions shall be verified on site before proceeding with the work. 5. Foster + Partners shall be notified in writing of any discrepancies. 6. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning -Site & Architectural Review F+P Rev. Date I Reason For Issue Chk PLANNING APPLICATION Key Plan. Pruneridge Avenue N Z O Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Sections Project No. Date Scale at Arch E1 2193 01/31/2018 111=201-011 Number Revision P-TA14-5.10 00 Z_ Z_ LU Z U U U U U U Z J J J m m m m m M W W W rJ r LU Lj U) N CO LL1 W Of W W W W Z Q Q p Q Z Q Q p O' W W O' W W IL LL a a LL a o o 03� N 03 N N. TANTAU AVE. v----------------- / / / OFFICE SSL -20' -11" LEVEL B01 - PARKING STRUCTURE SSL -31'- 5" y LEVEL B02 - PARKING STRUCTURE SSL 41'- 11 " LEVEL B03 - PARKING STRUCTURE 01 Cross Section at Building Core 02 Typical Cross Section 1" = 20'-0" 1" = 20'-0" I LJCl/�U-r [•CTDA/%I/ /\AAV 1 Z U 0 Z J Q J ri mi Of ri 03 Longitudinal Section 1" = 20'-0" General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All levels are in feet and inches unless noted otherwise. 4. All dimensions shall be verified on site before proceeding with the work. 5. Foster + Partners shall be notified in writing of any discrepancies. 6. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning -Site & Architectural Review F+P Rev. Date I Reason For Issue Chk PLANNING APPLICATION Key Plan. Pruneridge Avenue N Z O Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Sections Project No. Date Scale at Arch E1 2193 01/31/2018 111=201-011 Number Revision P-TA14-5.10 00 T.O.P. 40' - 3 1/2" MECH. PENTHOUSE T.O.W. 39'- 1" LOUVER MECH. SCREEN oL T.O.P. 31' - 2 1/2" oL F.F.L. 16' -10 1/2" LEVEL 02 OIL F.F.L. 0'- 0" (+161-0" AMSL) LEVEL 01 W Y Y Y Z U U U J Q Q Q m ca, ro } HUJ LU LULU U) U) U) d T.O.P. 40'- 3 1/2" Z Q Q LU a � 0 �4� LL o Cn Lo Lf) N W Z J 0' W a O W I PG��------------- T.O.P. 40'-31/2" MECH. PENTHOUSE T.O.W. 39'-1" - - - - - - - - - - - - - - -------------- LOUVER MECH. SCREEN OLT.O. P. 31' - 2 1/2" OL F.F.L. 16'- 6 1/2" LEVEL 02 F.F.L. 0'- 0" (+161-0" AMS L) --------------- LEVEL 01 02 North Elevation 1" = 20'-0" CA' Ur!lr'LJT ClCTDAfll/ /AAAV \ ROOF JS SHELTER 60' HEIGHT SETBACK (MAX.) 03 West Elevation 1" = 20'-0" T.O.P 40'-31/2" MECH. PENTHOUSE OIL T.O.W. 39'-1" \ ----- LOUVERED MECH. SCREEN T.O.P. 31'-21/2" O.P. F.F.L. 16' -10 1/2" LEVEL 02 F.F.L. 0'-0" (+161'-0" AMSL) LEVEL 01 60' HEIGHT SETBACK (MAX.) 0East Elevation 4 1" = 20'-0" S ED General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All levels are in feet and inches unless noted otherwise. 4. All dimensions shall be verified on site before proceeding with the work. 5. Foster + Partners shall be notified in writing of any discrepancies. 6. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review Rev. Date Reason For Issue PLANNING APPLICATION Key Plan. Pruneridge Avenue N �z O F+P Chk Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Elevations West, North & South Project No. Date Scale at Arch E1 2193 01/31/2018 111=201-011 Number Revision P-TA14-5.20 100 60'HEIGHT SETBACK (MAX.) T.O.P. 40'- 3 1/2" / MECH. PENTHOUSE �4� T.O.W. 39' -1" 'N ----------------- / LOUVER MECH. SCREEN T.O.P. 31'-21/2" OL T.O.P. 16'-0" A.F.G. T.O.W. 8'-0" A.F.G. OL------------------------ ------- - / / LOUVERED SERVICE YARD ROOF (E) RESIDENTIAL WALL 16' HEIGHT OL F.F.L. 16'- 10 1/2" � SETBACK MAX. ________________> LEVEL 02 _ Q3 r�3 — — — — — — — — — — — — — — — — Q Q, z DRIVE ASILE 0'-6' A.F.G. OL F.F.L. 0'- 0" (+161-0" AMSL) ------------ -------- _ _ / --. _ ___ � " = ' - RAMP DN. �,�� �� AIR INTAKE LEVEL 01 0 1 South Elevation 1" = 20'-0" W Z Y U Y U Y U W Z J ~ Q m Q m Q m J W W C0 W U) W CO W W C Q H d � LU LU' LCL ' 04 N Lfi LL - l!7 T.O.P. 40'-31/2" MECH. PENTHOUSE T.O.W. 39'-1" - - - - - - - - - - - - - - -------------- LOUVER MECH. SCREEN OLT.O. P. 31' - 2 1/2" OL F.F.L. 16'- 6 1/2" LEVEL 02 F.F.L. 0'- 0" (+161-0" AMS L) --------------- LEVEL 01 02 North Elevation 1" = 20'-0" CA' Ur!lr'LJT ClCTDAfll/ /AAAV \ ROOF JS SHELTER 60' HEIGHT SETBACK (MAX.) 03 West Elevation 1" = 20'-0" T.O.P 40'-31/2" MECH. PENTHOUSE OIL T.O.W. 39'-1" \ ----- LOUVERED MECH. SCREEN T.O.P. 31'-21/2" O.P. F.F.L. 16' -10 1/2" LEVEL 02 F.F.L. 0'-0" (+161'-0" AMSL) LEVEL 01 60' HEIGHT SETBACK (MAX.) 0East Elevation 4 1" = 20'-0" S ED General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All levels are in feet and inches unless noted otherwise. 4. All dimensions shall be verified on site before proceeding with the work. 5. Foster + Partners shall be notified in writing of any discrepancies. 6. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review Rev. Date Reason For Issue PLANNING APPLICATION Key Plan. Pruneridge Avenue N �z O F+P Chk Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 OLIN LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadelphia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title Elevations West, North & South Project No. Date Scale at Arch E1 2193 01/31/2018 111=201-011 Number Revision P-TA14-5.20 100 1. ROOFTOP PENTHOUSE LOUVERS External Material 2. ROOFTOP MECHANICAL SCREEN 3. CONCRETE EYEBROW (CORNERS TO BE CURVED) 4. INTERNAL ROLLER BLINDS 5. 0 It HIGH PERFORMANCE GLAZED CURVED CORNERS 6. HIGH PERFORMANCE DOUBLE GLAZED WINDOWS WITH MULLIONS 7. GREEN ROOF 1 Elevation -Typical North &South Bay 0- 0— y S ROOF 31'- 2112" General Notes 1. Do not scale drawings. Dimensions govern. 2. All dimensions are in feet and inches unless noted otherwise. 3. All levels are in feet and inches unless noted otherwise. 4. All dimensions shall be verified on site before proceeding with the work. 5. Foster + Partners shall be notified in writing of any discrepancies. 6. Any areas indicated on this sheet are approximate and indicative only. 00 01/31/2018 Planning - Site & Architectural Review Rev. Date Reason For Issue PLANNING APPLICATION Key Plan. W _ c a� a' M r_ M N �z O Pruneridge Avenue –LLII F+P Chk Foster + Partners 1000 Samsome Street Suite 240 San Francisco, CA 94111 T 408 610 5800 www.fosterandpartners.com © Foster + Partners 2017 y SOFFIT LEVEL 02 OLIN 27'- 3112" LANDSCAPE ARCHITECTURE AND URBAN DESIGN Public Ledger Building, Suite 1123 150 South Independence Mall West Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 www.theolinstudion.com OLIN Partnership. Ltd T FFL LEVEL 02 16'- 10 1 /2" IT SOFFIT LEVEL 01 14'- 11/2" V 01 /� FFLLEVEL 01 Luk and Associates 738 Alfred Nobel Drive Hercules, CA 94547 T 510 724 3388 www.lukassociates.com Client Apple Inc. Project Tantau 14 Building Apple Park Phase 2 Title North Facade Rendered Elevation & External Materials Project No. Date Scale at Arch E1 2193 01/31/2018 1/411 =1'-0" Number Revision P-TA14-5.30 100