Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
AH Packet 8-9-18
CITY OF CUPERTINO AGENDA ADMINISTRATIVE HEARING 5:00 PM 10300 Torre Avenue, City Hall Conference Room C Thursday, August 9, 2018 ROLL CALL APPROVAL OF MINUTES 1.Subject: Draft Minutes of April 12, 2018 Recommended Action: Approve or modify the Draft Minutes of April 12, 2018 Draft Minutes of April 12, 2018 POSTPONEMENTS ORAL COMMUNICATIONS This portion of the meeting is reserved for persons wishing to address the members on any matter not on the agenda. Speakers are limited to three (3) minutes. In most cases, State law will prohibit the members from making any decisions with respect to a matter not listed on the agenda PUBLIC HEARINGS 2.Subject: Front Yard Interpretation to consider designating the street side property line (Bette Avenue) as the front lot line to allow for a 198 square foot addition to the first floor and a Two Story Permit to consider allowing a 980 square foot second floor to an existing single-story residence. Application No(s).:R-2018-20, INT-2018-01; Applicant(s): Clayton Johnson (Lau residence); Location: 10550 Bette Avenue APN# 369-26-016 Recommended Action: That the Hearing Officer adopts the draft resolutions to: 1) Find that the proposed actions are exempt from CEQA; and 2) Approve applications INT-2017-01 for a Front Yard Interpretation and R-2018-20 for a Two Story Permit Hearing Officer's decision final unless appealed Page 1 August 9, 2018Administrative Hearing AGENDA Staff Report 1 - Draft Resolution for INT-2018-01 2 - Draft Resolution for R-2018-20 3 - Plan Set 4 - Glenview Ave corner lot survey 3.Subject: Architectural and Site Approval to consider a proposed 85,247 square foot office building including revisions to the parking structure, from above grade to below grade, for a previously approved office, research and development campus (Apple Park Phase 2- Tantau 14). Applications: ASA-2018-18, EA-2018-05; Applicant: Bernard Baker, Apple Inc.; Project Location: 10500 N. Tantau Avenue; A.P.N.: 316-06-063 Recommended Action: That the Hearing Officer adopt the Draft Resolution to: 1) Adopt the Eighth Addendum to the Final EIR (EA-2018-05); and 2) Approve the Architectural and Site Approval Permit (ASA-2018-18.) Hearing Officer's decision final unless appealed Staff Report 1 - Draft Resolution 2 - Eighth Addendum to AC 2 EIR 3 - Plan Set 4 - Public Comment OLD BUSINESS NEW BUSINESS ADJOURNMENT Page 2 August 9, 2018Administrative Hearing AGENDA In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend the next meeting who is visually or hearing impaired or has any disability that needs special assistance should call the City Clerk's Office at 408-777-3223, 48 hours in advance of the meeting to arrange for assistance. Upon request, in advance, by a person with a disability, meeting agendas and writings distributed for the meeting that are public records will be made available in the appropriate alternative format. Also upon request, in advance, an assistive listening device can be made available for use during the meeting. Any writings or documents provided to a majority of the members after publication of the agenda will be made available for public inspection. Please contact the City Clerk’s Office in City Hall located at 10300 Torre Avenue during normal business hours. IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal Code 2.08.100 written communications sent to the Cupertino City Council, Commissioners or City staff concerning a matter on the agenda are included as supplemental material to the agendized item. These written communications are accessible to the public through the City’s website and kept in packet archives. You are hereby admonished not to include any personal or private information in written communications to the City that you do not wish to make public; doing so shall constitute a waiver of any privacy rights you may have on the information provided to the City. Members of the public are entitled to address the members concerning any item that is described in the notice or agenda for this meeting, before or during consideration of that item. If you wish to address the members on any other item not on the agenda, you may do so during the public comment. Page 3 Cupertino, CA 95014 (408) 777-3308 ACTION MINUTES OF THE REGULAR MEETING OF THE ADMINISTRATIVE HEARING HELD ON April 12, 2018 ROLL CALL Hearing Officer present: Benjamin Fu, Assistant Director of Community Development Staff present: Gian Martire, Associate Planner Applicant(s) present: Cindy Hsu (Greenleaf Group, LLC), property owner/developer Mike Chen, Architect for the property owner APPROVAL OF MINUTES: 1.February 8, 2018 The minutes of February 8, 2018 were approved as written POSTPONEMENTS/REMOVAL FROM CALENDAR: None ORAL COMMUNICATIONS: None WRITTEN COMMUNICATIONS: None PUBLIC MEETING ITEMS: 2. Application No.(s): TM-2017-02, R-2018-08, R-2018-09, TR-2018-05 (EA-2017-02) Applicant:Cindy Hsu (Greenleaf Group, LLC) Location: 22561 Alcalde Road APN#(s): 342-29-063 Tentative Map application to allow the subdivision of a 19,562 square foot lot into 2 residential lots of approximately 8,892 square feet each; and to allow the construction of 2, new two-story single family residences on the newly created lots; and a Tree Removal Permit to allow the removal and replacement of trees to facilitate the residential construction; A Mitigated Negative Declaration Administrative Hearing decision final unless appealed. 2 Administrative Hearing February 12, 2018 Staff Member Martire addressed the Hearing Officer. The subject lot is located in the R1-7.5 Zone. The applicant is proposing to subdivide the parcel into 2 equal size lots of approximately 8900 square feet each. The new lots will be 89 feet wide, far exceeding the minimum lot width of 60 feet. Each lot will also have a 10 foot public works easement to allow for new sidewalks, curbs and gutters. The lots will then be developed with one two-story home on each lot. The homes meet all the R1 Zone requirements for setbacks, parking and FAR. There is a 37” diameter Coast Live oak tree located in the middle of Lot B. This tree will be removed and replaced in accordance with the City’s Tree Ordinance. Although it is not required, the applicant will plant privacy trees along the North property line, towards the residential duplex to mitigate any privacy concerns the neighbors there may have. This project was heard buy the Environmental Review Committee at their regular meeting on March 1, 2018. The Committee recommended approval of a Mitigated Negative Declaration. Mitigations include, a nesting bird survey, a soil remediation plan and lead and asbestos study prior to the demolition of the existing home on the site. During the comment period for the Environmental Review Committee meeting and the Administrative Hearing meeting, comments were received from neighbors. Staff has addressed those comments in the Staff report. The comments were primarily regarding the disruption of the neighborhood during the construction process and the widening of the street. Staff member Martire conceded that construction is a disruption that there is not much that can be done about, however, he explained that the City and other Regulatory Agencies have rules and guidelines that the applicant will be required to follow during construction. A violation of these rules will constitute a Code Violation. Neighbors were also concerned that the street would become too wide so as to have the potential of becoming a safety hazard. He explained that the road will not be any wider that is current. A good example is the road in front of 22539 and 22159 Alcalde Road. The public works easement will not widen the road it will be along the road for sidewalk improvements and street trees. Another comment suggested that the homes be limited to single story. Staff member Martire stated that two story homes are allowed in the R1 Zone. The Hearing Officer asked for clarification about how the lots are exempt from the privacy tree planting requirement. Staff Member Martire explained that per the Code, second story windows with a 5’ (or lower) sill from the floor, needs to have trees planted in order to obstruct views into neighboring back and side yards. The second story of the home does not have these low sills. The lower floor does, but first floor windows do not trigger the privacy planting requirement. However, the applicant is willing to plant the trees anyway. The Hearing Officer asked how many protected trees are on site. There is one. There are other trees on site that will be removed and replaced. The Hearing Officer noted that the lots have different side setbacks. Staff member Martire stated that the proposed home on Lot A will have an additional onsite parking area, so the setback on that side was reduced for the carport. The Hearing Officer asked for clarification about one of the Findings mentioned in the Draft Resolution for the Two-Story Residences, stating that the homes are “harmonious in scale and design with the neighborhood”. Staff member Martire stated that the proposed homes are not 3 Administrative Hearing February 12, 2018 the first two-story homes in the area. There are several other examples of two-story or single- story additions creating a second story in the neighborhood. The Hearing Officer asked the Architect to explain how his design supports the finding of the homes being “harmonious in scale and design with the neighborhood”. Architect, Mike Chen, said that the homes were designed based on the shape of the lots, such that they would fit on the lots nicely. The design of the homes is a Tuscany style similar to many homes in the City. He mentioned that the houses are proposed to be built lower than what is allowed. The Hearing Officer opened the public comment period. A neighbor, John Kolski, addressed the Hearing Officer. He has submitted several comments regarding the project. He is very concerned about the construction process as there is another development happening in the area. It has been going on for a very long time and has been very disruptive to the neighborhood. Staff member Martire explained how the construction permitting process works. Once the Building Permit has been applied for, the Public Works department imposes conditions on the contractor. These conditions will need to be satisfied before the construction permits will be issued. These conditions will include grading, compaction of the infill and an approved bio- swale design to meet the C-3 requirements for runoff water control and the street improvements. The Hearing Officer is approving conceptual designs at this meeting. The Planning Department will also review the construction drawings to make sure that the homes are built within the allowed setbacks, at the proper heights and with approved landscape and site improvements. Staff member Martire then read from the Conditions of Approval from the Draft Resolution for the R-2018-08 and R-2018-09 applications and the terms in the Best Construction Management Plan. He stated that the contractor and developer are responsible for knowing and following the rules and are subject to sanctions if they don’t. The Hearing Officer admonished the developer to be aware of the sensitivities of the neighbors. He asked that Staff let Mr. Kolski know when the building permit has been applied for so he can review the Construction Management Plan. The Hearing Officer closed the comment period. The Hearing Officer supports the project. The homes meet the Zoning Code requirements and the design is cohesive with the neighborhood. He again asked the developer to work with the neighbors to ensure a smooth process. DECISION: The application was approved by the Hearing Officer per the draft resolutions. ADJOURNMENT Respectfully submitted: _____/s/Beth Ebben Beth Ebben Deputy Board Clerk ADMINISTRATIVE HEARING STAFF REPORT Agenda Date:August 9, 2018 SUBJECT Front Yard Interpretation to consider designating the street side property line (Bette Avenue) as the front lot line to allow for a 198 square foot addition to the first floor and a Two Story Permit to consider allowing a 980 square foot second floor to an existing single-story residence. (Applications: INT-2017-01 and R-2018-20; Applicant: Clayton Johnson, Premiere Builders; Project Location: 10550 Bette Avenue; A.P.N.: 369-26-016) RECOMMENDED ACTION That the Hearing Officer adopt the Draft Resolutions to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve applications INT-2017-01 for a Front Yard Interpretation and R-2018-20 for a Two Story Permit (Attachments 1 and 2). DISCUSSION Project Data: Special Area/Neighborhood South Blaney Neighborhood General Plan Designation Low Density Residential (1-5 DU/Acre) Zoning Designation R1-10 (Single-Family Residential) Allowed/Required Existing Proposed Lot Size 6,657 sq. ft. (0.15 acres) Lot Coverage 50%32%35% Proposed Size 2,996 sq. ft.1,745 sq. ft.2,923 sq. ft. First Floor -1745 sq. ft.1,943 sq. ft. Second Floor -0 sq. ft.980 sq. ft. F.A.R.45%26%44% 1st Floor Setbacks Front 20’18’-5”20’-5” Rear 20’22’-10”22’-10” Street Side 12’15’15’ Interior Side 5’14’-8” 5’-9” 2nd Floor Setbacks Front 25’-25’ Rear 25’-25’ Street Side 12’-23’-4” Interior Side 20’-20’ Total Building Height 28’13’-7”23’-10” Project Consistency With: General Plan Yes Zoning Yes (upon approval of the Front Yard Interpretation) Environmental Review Categorically Exempt per Section 15301 of the California Environmental Quality Act (CEQA) Background: Proposed Project: The applicant, Clayton Johnson (Premiere Builders), representing the property owners Stephen and Jane Lau,is proposing a 198 square foot addition to the first floor and a 980 square foot second floor to an existing single-story residence (See Attachment 3.)As part of the project proposal, the applicant is requesting a Front Yard Interpretation to establish Bette Avenue as the front lot line and a Two Story Permit for the second floor addition. Site Description: The property is located at the southeast corner of Bette and Glenview Avenues in the South Blaney neighborhood (Figure 1). The existing 1,745 square foot single-story home is located in a residential zoning district and is surrounded on all sides by single-family residences. Chapter 19.08 of the Municipal Code defines the front lot line on a corner lot as the shorter lot line abutting a street. For the subject property, the lot line on Glenview Avenue measures 55 feet and the lot line on Bette Avenue measures 70 feet. Therefore, in Figure 1: Aerial accordance with the City’s Municipal Code, Glenview Avenue is considered the front lot line. Although the proposed addition it is not consistent with the City’s current Zoning ordinance, the Municipal Code recognizes that in certain cases, the definition of the front lot line may be modified, particularly when it improves the design relationship of the proposed buildings/additions to adjacent buildings and development, or if there is a pattern of corner lots within the subdivision where the required street side yard is functionally the property’s front yard. Therefore, the applicant has applied for a front yard interpretation. Analysis: Front Yard Interpretation The proposed project is consistent with the General Plan. It is also consistent with the Single-Family Residential (R1) Ordinance of the Cupertino Municipal Code in all respects, should a Front Yard Interpretation be approved. Setback requirements are intended to establish a consistent pattern of development and to improve the interface between the street and building frontage. The proposed building orientation is consistent with the original front yard setback requirements for the property prior to any street dedications, matching other neighboring properties in the area. There is a pattern of corner lot residences within the original tract, approved in 1959, along Glenview Avenue in the South Blaney neighborhood (between East Estates Drive and Oakville Avenue) that have functional front yards along the longer lot line. Specifically, 6 out of the 12 corner lot residences (including the existing residence on the project site) are oriented towards the longer lot line (see Attachment 4.) Many of these homes were built in the 50’s and 60’s under the City of Cupertino’s earlier zoning standards, when an applicant with a corner lot could choose which street to place the front setback along. This is no longer allowed and therefore, these homes are considered legal, non-conforming. Therefore, future additions and rebuilds have to comply with the City’s current requirements else, apply for a Front Yard Interpretation permit. A Front Yard Interpretation to designate the property line along Bette Avenue as the front lot line does the following: 1. Reinforce the residential building relationship as established by the original development of this subdivision; 2. Eliminate the non-conforming status of the existing residence due to the existing front and rear yard setback encroachment per Cupertino regulations; 3. Maintain the frontage orientation of the surrounding properties; and 4. Improve the relationship of existing residences and future developments. Two-Story Permit The project includes a Two Story Permit application for the addition of a second floor to the existing single-story residence (see Attachment 3). The second story to first story ratio for the proposed project is 50.43%. Therefore, design review is not required for this project. The setbacks, height, and building size that are proposed comply with the development standards and applicable Residential Design Guidelines in Cupertino Municipal Code Chapter 19.28: Single-Family Residential (R-1) Zones. The proposed addition is also compatible with existing homes in the neighborhood. The property owners are proposing to plant privacy protection trees along the east (rear) property line to screen views from the second story windows with sill heights that are five feet or less from the finished floor. Additionally, a new front yard tree is proposed to be planted on the property to mitigate the building massof the new second-story addition from the public right-of-way in compliance with Section 19.28.120 of the Municipal Code. Environmental Review This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15301(e) – Existing Facilities because the exemption applies to the addition of up to 10,000 sq. ft. in an area where all public services and facilities are available to allow for maximum development permissible in the General Plan and the project is not located in an environmentally sensitive area. PUBLIC NOTICING AND COMMUNITY OUTREACH The following table is a brief summary of the noticing done for this project: Notice of Public Meeting & Site Signage Agenda Site Signage (10 days prior to hearing) 8 notices mailed to property owners adjacent to the project site (10 days prior to hearing) Posted on the City's official notice bulletin board (one week prior to hearing) Posted on the City of Cupertino’s Web site (one week prior to hearing) No public comments were received at the time of production of this staff report. PERMIT STREAMLINING ACT This matter is adjudicatory and is subject to the Permit Streamlining Act (Government Code Section 65920 – 65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received: May 8, 2018; Deemed Incomplete: June 4, 2018 Project Resubmitted: June 26, 2018;Deemed Complete: July 3, 2018 The City has 60 days (until September 3, 2018) to make a decision on the project. CONCLUSION Staff recommends approval of the Front Yard Interpretation and Two Story Permit because the project is consistent with the General Plan, and zoning ordinances, and conforms to the single-family residential development pattern, in accordance with Chapter 19.28 of the Cupertino Municipal Code. Additionally, all of the findings for approval of the proposed project, consistent with the Cupertino Municipal Code, may be made as reflected in the Draft Resolutions. NEXT STEPS The permit will be effective 14 calendar days from the date of the hearing. The decision of the Administrative Hearing Officer is final, unless appealed within 14 calendar days from the date of the hearing. The applicant may apply for building and/or other permits with the City at the end of the appeal period. This approval is valid until August 9, 2019. The applicant may apply for a one-time one year extension before the approval expires. Prepared by: Gian Paolo Martire, Associate Planner Reviewed By: Piu Ghosh, Principal Planner ATTACHMENTS 1. Draft Resolution for INT-2017-01 2. Draft Resolution for R-2018-20 3. Plan Set 4. Glenview Avenue Corner Lot Survey CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRAFT RESOLUTION OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO TO ALLOW A FRONT YARD INTERPRETATION TO DESIGNATE THE PROPERTY LINE ALONG BETTE AVENUE AS THE FRONT LOT LINE FOR THE PROPERTY LOCATED AT 10550 BETTE AVENUE SECTION I: PROJECT DESCRIPTION Application No.:INT-2018-01 Applicant:Clayton Johnson (Premiere Builders) Location:10550 Bette Avenue A.P.N.:369-26-016 SECTION II: FINDINGS WHEREAS, the City of Cupertino received an application for a Front Yard Interpretation to consider designating the street side property line (Bette Avenue) as the front lot line and a Two Story Permit to consider allowing a 198 square foot addition to the first floor and a 980 square foot addition of a second floor to an existing single-story residence; and WHEREAS, the project is categorically exempt from the California Environmental Quality Act (CEQA); and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting in regard to the application; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds that: 1. The project is consistent with the Cupertino General Plan, any applicable specific plans, zoning ordinance, and the purposes of the R1 Ordinance; and The proposed project is consistent with the existing residential land use designation for the site. There are no changes proposed to the land use. Title 19, Zoning, and Chapter 19.28, Single- Family Residential (R1) Ordinance, of the Cupertino Municipal Code allow the property owner to apply for an interpretation to designate the street side lot line as the front lot line if it makes the design relationship of the proposed building or addition to adjacent buildings and Draft Resolution INT-2018-01 August 9, 2018 Page 2 development or if there is a pattern of corner lots within the subdivision where the required street side yard is functionally the property’s front yard. The project proposes to have a 20 foot front setback on the Bette Avenue frontage and a 12 foot side yard setback on the Glenview Avenue frontage. 2. The proposed project is harmonious in scale and design with the general neighborhood; and The interpretation will reinforce the existing residential building relationship as established by the original development when the property was in the City of Cupertino in 1959, maintain the frontage orientation of the subject site and surrounding properties, and improve the relationship of existing residences and future developments. There are several existing two story homes in the neighborhood and the proposed design is similar to the newer homes in the neighborhood. 3. The granting of the permit will not result in a condition that is detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, or welfare. No changes to site access are proposed. Therefore, there is no change or impact to the surrounding neighborhood due to access to and from the site. Since the proposed project meets all required setbacks of the R1 zoning district and the Zoning Title, there are no conflicts with corner sight triangles. Therefore, the proposed project will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, or welfare. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony, and other evidence submitted in this matter, the Hearing Officer of the Administrative Hearing does determine that, Application No. INT-2018-01, is categorically exempt from CEQA; and approves said application; and That the subconclusions upon which the findings and conditions specified in Section III of this Resolution are based and contained in the public meeting record concerning Application No. INT-2018-01 as set forth in the Minutes of the Administrative Hearing Meeting of August 9, 2018, and are incorporated by reference herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set entitled, “Bette Ave Residence Addition, 10550 Bette Ave., Cupertino, CA 95014,” drawn by D-Square Studio dated March 1, 2017 Draft Resolution INT-2018-01 August 9, 2018 Page 3 consisting of eight (8) sheets labeled A-0.0 through A-5.0; and the boundary survey entitled, “Site Plan/Boundary Survey” certified by John K. King dated April 19, 2018 consisting of one (1) sheet; except as may be amended by conditions in this resolution. 2. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the building plans. 3. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements, and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 4. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no R-2018-20, shall be applicable to this approval. 5. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 6. FRONT YARD INTERPRETATION An Interpretation is granted to allow the lot line adjoining Bette Avenue to be considered the front lot line. Any future additions or modifications to the residence shall be consistent with the interpretation of the lot line adjoining Bette Avenue as the front lot line. 7. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the “indemnified parties”) from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys’ fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys’ fees and costs within 30 days following receipt of invoices from City. Such attorneys’ fees and costs shall include Draft Resolution INT-2018-01 August 9, 2018 Page 4 amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 8. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 9th day of August, 2018 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST:APPROVED: _______________________ Gian Paolo Martire Benjamin Fu Associate Planner Assistant Director of Community Development CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRAFT RESOLUTION OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO TO ALLOW A TWO STORY PERMIT FOR A 980 SQUARE FOOT SECOND STORY ADDITION TO AN EXISTING SINGLE-STORY RESIDENCE SECTION I: PROJECT DESCRIPTION Application No.:R-2018-20 Applicant:Clayton Johnson (Premiere Builders) Location:10550 Bette Avenue (A.P.N 369-26-016) SECTION II: FINDINGS FOR A TWO-STORY PERMIT: WHEREAS, the City of Cupertino received an application for a Two-Story Permit as described in Section I of this Resolution; and WHEREAS, the project is categorically exempt from the California Environmental Quality Act (CEQA); and WHEREAS, the necessary notices have been given in accordance with the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held one or more Public Meetings on this matter; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds: a)The project is consistent with the Cupertino General Plan, any applicable specific plans, zoning ordinance and the purposes of this title. The proposed project is consistent with the General Plan as the project is within the Low Residential (1-5 DU/acre) land use area and the project does not propose to change the land use. There are no applicable specific plans that affect the project. As the Front Yard Draft Resolution. R-2018-20 August 9, 2018 Page - 2 - Interpretation has been approved, the project has been found to be consistent with the requirements of Cupertino Municipal Code Chapter 19.28 Single Family (R-1) Residential. b)The granting of the permit will not result in a condition that is detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety or welfare. The granting of the permit will not result in a condition that is detrimental or injurious to property improvements in the vicinity, and will not be detrimental to the public health, safety or welfare as the project is located within the R1-10 (Single Family Residential) zoning district, and will be compatible with the surrounding uses of the neighborhood. c)The proposed project is harmonious in scale and design with the general neighborhood. The proposed project is located in a residential area consisting of single family homes. There are existing two story homes in the neighborhood. The proposed project maintains the single family home scale found compatible with the general neighborhood. d)Adverse visual impacts on adjoining properties have been reasonably mitigated. Any potential adverse impacts on adjoining properties have been reasonably mitigated through the installation of privacy protection plantings and front yard trees as required. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on Page 2 thereof, the application for a Two-Story Permit, Application no. R-2018-20, is hereby approved; and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the Public Meeting record concerning Application no. R-2018-20 as set forth in the Minutes of Administrative Hearing Meeting of August 9, 2018, and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set entitled, “Bette Ave Residence Addition, 10550 Draft Resolution. R-2018-20 August 9, 2018 Page - 3 - Bette Ave., Cupertino, CA 95014,” drawn by D-Square Studio dated March 1, 2017 consisting of eight (8) sheets labeled A-0.0 through A-5.0; and the boundary survey entitled, “Site Plan/Boundary Survey” certified by John K. King dated April 19, 2018 consisting of one (1) sheet; except as may be amended by conditions in this resolution. 2. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the building plans. 3. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 4. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no INT-2018-01, shall be applicable to this approval. 5. PRIVACY AND FRONT-YARD TREE PLANTING The final privacy and front-yard tree planting plan shall be reviewed and approved by the Planning Division prior to issuance of building permits. The variety, size, and planting distance shall be consistent with the City’s requirements. 6. PRIVACY AND FRONT-YARD TREE PROTECTION COVENANT The property owner shall record a covenant on this property to inform future property owners of the privacy protection measures and tree protection requirements consistent with the R-1 Ordinance, for all second floor balconies and windows with views into neighboring yards and a sill height that is 5 feet or less from the second story finished floor. The precise language will be subject to approval by the Director of Community Development. Proof of recordation must be submitted to the Community Development Department prior to final occupancy of the residence. 9. EXTERIOR BUILDING MATERIALS/TREATMENTS Final building exterior treatment plan (including but not limited to details on exterior color, material, architectural treatments and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The final building exterior plan shall closely resemble Draft Resolution. R-2018-20 August 9, 2018 Page - 4 - the details shown on the original approved plans. Any exterior changes determined to be substantial by the Director of Community Development shall require a minor modification approval with neighborhood input. 10. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 11. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the “indemnified parties”) from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys’ fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys’ fees and costs within 30 days following receipt of invoices from City. Such attorneys’ fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 12. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 9th day of August, 2018 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by Draft Resolution. R-2018-20 August 9, 2018 Page - 5 - the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST:APPROVED: _____ __________________ Gian Paolo Martire Benjamin Fu Associate Planner Asst. Dir. of Communit Development Glenview Avenue Corner Lot Survey = Corner parcels which have front setbacks facing the longer lot line. ADMINISTRATIVE HEARING STAFF REPORT Agenda Date:August 9, 2018 SUBJECT Architectural and Site Approval to considera proposed 85,247 square foot office building including revisions to the parking structure, from above grade to below grade, for a previously approved office, research and development campus (Apple Park Phase 2- Tantau 14). (Applications: ASA-2018-18, EA-2018-05; Applicant: Bernard Baker, Apple Inc.; Project Location: 10500 N. Tantau Avenue; A.P.N.: 316-06-063) RECOMMENDED ACTION That the Hearing Officer adopt the Draft Resolution (Attachment 1) to: 1. Adopt the Eighth Addendum to the Final EIR (EA-2018-05); and 2. Approve the Architectural and Site Approval Permit (ASA-2018-18.) DISCUSSION Project Data: Existing/Approved Proposed General Plan Designation Industrial/Residential No change Zoning Designation P(MP)No change Site Area (acres)No change Total approved development area Phase 2 642,000 No change (proposal consistent) Office 480,000 69,386 sq.ft. Amenity 162,000 15,861 sq.ft. Employees 500 No change Parking 600 spaces No change Structure 200,000 sq.ft. (2 stories)0 Below-grade 51,000 sq.ft. (1 level)193,000 sq.ft (3 levels) Surface 0 151 Background: The applicant, Apple Inc., received approval from the City Council in November 2013 to demolish existing office, research and development buildings and replace them with a new office, research and development campus to be developed in two phases. The project, referred to as Apple Campus 2, is located in the North Vallco Area and encompasses approximately 176 acres. Apple is now applying for an architectural review and approval for an 85,247 office building and associated revised parking structure, which is referenced as Tantau 14, Site B of Phase 2 of the project. The parcel is located at the southeast corner of the intersection of North Tantau Avenue and Pruneridge Avenue. Existing/Approved Proposed Bicycle Parking (min. 5% of project wide automobile parking requirement) 600 600 Setbacks Front Setback (min.)15’ 1:1 slope line on N. Tantau Consistent Street Side Setback (min.)15’Consistent Rear setback (min.)25’ Adjacent to residential zones –100’ Consistent Building Height (max.)Up to 35’ beyond 150 feet from east property line Up to 16’ within 150 feet from east property line 31’ to roof level of building (consistent) 39’ to top of mechanical screen (screens allowed to exceed building height by General Plan) Consistency with General Plan Yes Yes Consistency with Zoning Yes Yes Environmental Assessment Apple Campus 2 Final EIR (certified Oct. 15, 2013) Addendum to Final EIR prepared (Attachment 2) The surrounding land uses include: To the north, Apple Park Visitor’s Center To the west and south: office, research and development facilities To the east: single family residential uses in the City of Santa Clara Analysis: Site Plan and Parking: The proposed project is within the approved development permit allocation and an improvement over the conceptual plans for the site presented to the City Council in October 2013. The main improvements include: Reduction of the office area from 87,000 sq. ft. to 69,286 sq. ft. Elimination of an above ground two-story parking structure, abutting existing single family residential uses in the City of Santa Clara, by providing a three level below-ground parking structure. A green roof at the first story roof that projects beyond the second story footprint, contributing to overall run-off reduction and sustainability. The proposed building location and site access remains the same. The entrance to the proposed below-grade parking structure is oriented primarily toward the entrance on North Tantau Avenue. The project will also include an enclosure for trash facilities and other utilities near the entrance to the parking structure. Sitework and Grading: Grading and off-haul do increase on the project site to accommodate the larger below grade parking garage. See discussion in the environmental review section below. Architecture and landscape: The design is compatible with the main Apple Campus 2 concept and the neighboring buildings on Tantau, featuring clean lines/contemporary architecture, glass façade with curved corners, and concrete eaves. As part of the campus-wide tree planting strategy, the proposal includes the planting of a significant number of trees (250 trees). The existing wall along the east property line adjacent to Santa Clara would be maintained as required by the conditions of approval of the Master Development Permit for the campus. The number of trees proposed to be removed are within the number of trees allowed to be removed on the entire campus per the Master Tree Removal permit. Development Allocation: The proposed building is within the development permit envelope approved previously by the City Council in 2013. The amenity space is consistent with the existing allocation for phase 2. In this case, the office space has been reduced. A condition of approval continues to restrict the conversion of any amenity spaces to non-amenity spaces without appropriate permits. Environmental Review: Since the excavation needed to construct the proposed larger underground parking area and off-haul of the additional material would increase from the approved amount of excavation, an Addendum to the Final EIR certified in October 2013 has been prepared to ensure that the amendments to the projectdo not cause the occurrence of the conditions described in Section 15162 of the California Environmental Quality Act and the preparation of a subsequent EIR (See Attachment 2.) There are 20,000 cubic yards (CY) of excavation of material available of the originally approved amount. The proposed below- grade parking structure will increase the required excavation and off-haul amounts by 68,000 CY to a total of 88,000 CY. The environmental effects of this change in the amount of excavation and associated construction and truck trips were evaluated by LSA Associates, Inc. in their air quality peer review memo dated July 20, 2018. The memo indicated that no impacts would be associated with the proposed changes identified in the design applications for the ancillary buildings. The Addendum finds that the revisions that the applicant is seeking would not require major revisions to the Final EIR certified on October 15, 2013, due to new or substantially increased significant environmental effects and that the certified Final EIR adequately identifies all environmental effects and adequate mitigation measures for the proposed modifications to the previously approved project. Therefore, no subsequent or supplemental EIR is required prior to approval of the Architectural and Site Approval of the proposed project described above. PUBLIC NOTICING AND COMMUNITY OUTREACH The following table is a brief summary of the noticing done for this project: Notice of Public Meeting & Site Signage Agenda Site Signage (10 days prior to hearing) Notices mailed to property owners adjacent to the project site (10 days prior to hearing) Posted on the City's official notice bulletin board (one week prior to hearing) Posted on the City of Cupertino’s Web site (one week prior to hearing) Public comments were received from one Santa Clara neighbor, Milt Kostner, who is supportive of the parking structure revision but has concerns including the tree species being planted, the preservation of the 8-foot wall between properties, and shielding of light sources (See Attachment 4.) Standard conditions of approval would adequately address these concerns. PERMIT STREAMLINING ACT This matter is adjudicatory and is subject to the Permit Streamlining Act (Government Code Section 65920 – 65964). The City has complied with the deadlines found in the Permit Streamlining Act. The project was deemed complete on July 20, 2018. The City has 60 days (until September 18, 2018) to make a decision on the project. CONCLUSION Staff recommends approval of the Architectural and Site Approval Permit because the project is consistent with the General Plan, applicable zoning ordinances and the Master Development Permit approved in 2013. Additionally, all of the findings for approval of the proposed project, consistent with Chapter 19.168 of the Cupertino Municipal Code, may be made as reflected in the Draft Resolutions. NEXT STEPS The permit will be effective 14 calendar days from the date of the hearing. The decision of the Administrative Hearing Officer is final, unless appealed within 14 calendar days from the date of the hearing. The applicant may apply for building and/or other permits with the City at the end of the appeal period. Prepared by: Catarina Kidd, Senior Planner Reviewed and Approved by: Piu Ghosh, Principal Planner ATTACHMENTS 1. Draft Resolution 2. 8 th EIR addendum and technical memos 3. Plan Set 4. Public comments CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRAFT RESOLUTION NO. ____ OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL APPLICTION FOR APPLE PARK PHASE 2, SITE B, TANTAU 14 LOCATED AT 10500 N. TANTAU AVENUE SECTION I: PROJECT DESCRIPTION Application No.:ASA-2018-18 (EA-2018-05) Applicant:Bernard Baker, Apple Inc. Location:10500 N. Tantau Avenue; APN: 316-06-063 SECTION II: FINDINGS WHEREAS, based on substantial evidence in the administrative record, on October 15, 2013, the City Council held a public hearing to consider the approval of an office, research and development campus; and WHEREAS, after consideration of evidence contained in the entire administrative record, at the public hearing on October 15, 2013, the City Council adopted Resolution No. 13-082 certifying the Final EIR, adopting Findings and a Statement of Overriding Considerations, adopting Mitigation Measures, and adopting of a Mitigation Monitoring and Reporting Program for the Apple Campus 2 development; and WHEREAS, the City Council approved an office, research and development campus for Apple Inc. including entitlements for a phased development of the campus which included the development of properties along North Tantau Avenue in separate phases; and WHEREAS, an application was received by the City for an Architectural and Site Approval permit to consider allowing a proposed 85,247 square feet office building and a revision to the associated parking structure from above grade to below grade for Phase 2 of a previously approved office, research and development campus as described in Section I above; and WHEREAS, environmental analysis and peer reviews were conducted by LSA Associates, Inc. pursuant to the requirements of CEQA, finding that no new or substantially increased significant environmental effects; and Resolution No. ____ ASA-2018-18 (EA-2018-05) August 9, 2018 Page 2 WHEREAS, the Administrative Hearing Officer has reviewed the information in the Eighth Addendum to the Final EIR, which concludes that no further environmental review is required for the proposed amendments to the development; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting in regard to the application; WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds: 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The proposal will not be injurious or detrimental to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience because the project will incorporate programs and practices that are intended to increase sustainability and safety for the entire Apple Park corporate campus, employees and surrounding environment. The programs and practices that will be incorporated at this site include the planting of 250 trees (increasing tree count over five times the number of existing trees), corporate shuttle stop to reduce single occupancy vehicle trips, green roof to reduce run-off and provide additional natural habitat area, a bicycle share program, and on-site amenity areas that would reduce traffic congestion on city roads. 2. The proposal is consistent with the purposes of Chapter 19.168, Architectural and Site Review, of the Cupertino Municipal Code, the General Plan, any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: The project is in compliance with the General Plan and the Zoning regulations governing the project site. The architecture of the proposed project particularly furthers General Plan Policy 2-14: Attractive Building and Site Design “by careful attention to building scale, mass and placement, architecture, materials, landscaping, screening of equipment and loading areas and related design considerations.” The project design incorporates several of the strategies included in this General Plan Policy including articulation and segmentation of wall and roof planes through curved corners and concrete overhangs, visual openings in the wall plane with use of glass facades, appropriate setbacks and landscaping. The parking Resolution No. ____ ASA-2018-18 (EA-2018-05) August 9, 2018 Page 3 for the project has been revised from above grade to below grade to reduce visual impacts to neighbors to the east. a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings; b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new buildings should harmonize with adjacent development by being consistent or compatible with design and color schemes, and, with the future character of the neighborhood and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments, and provide shielding to prevent spill-over light to adjoining property owners; The buildings will be visible from the public right-of-way but minimally from the neighboring properties due to a masonry wall and proposed trees along the property line. The property values in the adjacent area will be maintained or enhanced due to proximity to this new employment center. The walls, fencing, hedges and screen planting have been designed to minimize the impacts upon adjacent properties and to be located beyond the 100 feet setback. Mechanical equipment will be shielded from view, located sufficiently away from the property line and screened so as to not be visible. Permeable surface area has been increased due to the green roof proposal. The removal of healthy trees has occurred where there are direct conflicts with improvements, but will be replaced by more than three times the number of trees that are removed. The lighting for the development has been designed so as to not spill over onto adjacent properties. The proposed revision of the parking structure from above grade to below grade reduces impact on neighbors. 250 trees to be planted around the site and along the property line screens the adjacent neighborhood from the office building and parking lot. The building observes the 100 feet setback from property line between the office site and residential neighbors to the east. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures shall minimize traffic hazards and shall positively affect the general appearance of the neighborhood and harmonize with adjacent development; and No signage is approved as part of this proposal. Resolution No. ____ ASA-2018-18 (EA-2018-05) August 9, 2018 Page 4 d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures The proposed revision of the parking structure from above grade to below grade reduces impact on neighbors. 250 trees to be planted around the site and along the property line screen the adjacent neighborhood from the office building and parking lot. The building observes the 100 feet setback from property line between the office site and residential neighbors to the east. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the addendum prepared for the proposed changes to the project, maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 4 thereof, the Administrative Hearing Officer hereby: 1. Determines that the Eighth Addendum to the Apple Campus 2 EIR (file no. EA- 2018-05) reflects the independent judgement of the Administrative Hearing Officer; and 2. Adopts the Eighth Addendum to the Apple Campus 2 EIR; and 3. Approves the application for an Architectural and Site Approval, Application no. ASA-2018-18; and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the public meeting record concerning Application No. ASA-2018-18 and EA-2018-05 as set forth in the Minutes of the Administrative Hearing Meeting of August 9, 2018, and are incorporated by reference herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set prepared by Foster + Partners, OLIN, and Luk and Associates consisting of 36 sheets labeled “Tantau 14 Building Apple Park Phase 2”, except as may be amended by conditions in this resolution. 2. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file nos. GPA-2011-03, Z-2011-03, DP-2011- 04, U-2011-11, ASA-2011-14, TM-2011-03, DA-2011-01, EA-2011-12 and TR-2011-39 shall be applicable to this approval. The conditions of approval set forth shall be incorporated into and annotated on the building plans. Resolution No. ____ ASA-2018-18 (EA-2018-05) August 9, 2018 Page 5 3. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 4. DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible, in accordance with the City’s Recycling and Diversion of Construction and Demolition Waste under Chapter 16.72 of the Cupertino Municipal Code. The applicant shall provide evidence that materials were recycled prior to issuance of final demolition permits. 5. LIGHTING On-site lighting must be in conformance with Cupertino Municipal Code Chapter 19.60 and automatic teller machine lighting, specifically, shall meet minimum standards required by the State of California Business and Professions Code. 6. LANDSCAPE DOCUMENTATION PACKAGE Prior to issuance of building permits, the applicant shall submit a full Landscape Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape Ordinance. The Landscape Documentation Package shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits, and additional requirements per sections 14.15.050 E, F, G, H, and I will be required to be reviewed and approved prior to final inspections. 7. LANDSCAPE AND IRRIGATION PLANS The applicant shall submit detailed landscape and irrigation plans to be reviewed and approved by the Directors of Community Development and Public Works or his/her designee prior to issuance of building permits. The landscape plan shall include water conservation and pesticide reduction measures in conformance with Chapter 14.15, Landscape Ordinance, and the pesticide control measures referenced in Chapter 9.18, Stormwater Pollution Prevention and Watershed Protection, of the Cupertino Municipal Code and shall also be amended to ensure that: a. Additional landscaping in the area closest to the right of way is incorporated through ground-level landscaping and/or in appropriately sized planter pots within the plaza area. The landscape planter box, fencing, landscaping, irrigation and/or plaza area design shall be reviewed and approved by the Director of Community Development prior to issuance of building permits; and Resolution No. ____ ASA-2018-18 (EA-2018-05) August 9, 2018 Page 6 b. A medium sized shade tree is planted at the plaza area subject to review and approval by the City in consultation with the City’s Consulting Arborist; and c. The final list of replacement trees is approved by the City in consultation with the city’s consulting arborist to reduce the number of crape myrtle trees proposed as replacement trees. 8. LANDSCAPE AND IRRIGATION MAINTENANCE Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be established and submitted to the Director of Community Development or his/her designee, either with the landscape application package, with the landscape installation report, or any time before the landscape installation report is submitted. a. Schedules should take into account water requirements for the plant establishment period and water requirements for established landscapes. b. Maintenance shall include, but not be limited to the following: routine inspection; pressure testing, adjustment and repair of the irrigation system; aerating and de-thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of failed plants; weeding; pest control; and removing obstructions to emission devices. c. Failed plants shall be replaced with the same or functionally equivalent plants that may be size-adjusted as appropriate for the stage of growth of the overall installation. Failing plants shall either be replaced or be revived through appropriate adjustments in water, nutrients, pest control or other factors as recommended by a landscaping professional. 9. LANDSCAPE AND IRRIGATION INSTALLATION REPORT The project is subject to all provisions delineated in the Landscape Ordinance (CMC, Chapter 14.15). A landscape installation audit shall be conducted by a certified landscape professional after the landscaping and irrigation system have been installed. The findings of the assessment shall be consolidated into a landscape installation report. The landscape installation report shall include, but is not limited to: inspection to confirm that the landscaping and irrigation system are installed as specified in the landscape and irrigation design plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that causes overland flow, and preparation of an irrigation schedule. The landscape installation report shall include the following statement: “The landscape and irrigation system have been installed as specified in the landscape and irrigation design plan and complies with the criteria of the ordinance and the permit.” Resolution No. ____ ASA-2018-18 (EA-2018-05) August 9, 2018 Page 7 10. SCREENING All mechanical and other equipment on the building or on the site shall be screened so they are not visible from public street areas or adjoining developments. Screening materials/colors shall match building features and materials. The height of the screening shall be taller than the height of the mechanical equipment that it is designed to screen. The location of equipment and necessary screening shall be reviewed and approved. 11. UTILITY STRUCTURE PLAN Prior to issuance of building permits, the applicant shall work with staff to provide a detailed utility plan to demonstrate screening or undergrounding of all utility structures [including, but not limited to backflow preventers (BFP), fire department connections (FDC), post-indicator valves (PIV), and gas meters] to the satisfaction of the Director of Community Development, Public Works, Fire Department, and applicable utility agencies. 12. EXTERIOR BUILDING MATERIALS/TREATMENTS The final building exterior plan shall closely resemble the details shown on the original approved plans. Final building exterior treatment plan (including but not limited to details on exterior color, materials, architectural treatments, doors, windows, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits to ensure quality and consistency. Any exterior changes determined to be substantial by the Director of Community Development shall either require a modification to this permit or a new permit based on the extent of the change. 13. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 14. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you Resolution No. ____ ASA-2018-18 (EA-2018-05) August 9, 2018 Page 8 fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT 15. STREET LIGHTING INSTALLATION Street lighting shall be installed and shall be as approved by the Director of Public Works. Lighting fixtures shall be positioned so as to preclude glare and other forms of visual interference to adjoining properties, and shall be no higher than the maximum height permitted by the zone in which the site is located. 16. GRADING AND DRAINAGE Grading shall be as approved and required by the Director of Public Works in accordance with Chapter 16.08 of the Cupertino Municipal Code. All storm drain inlets shall be clearly marked with the words “No Dumping – Flows to Creek” using permanently affixed metal medallions or equivalent, as approved by the Environmental Programs Division. 17. C.3 REQUIREMENTS C.3 regulated improvements are required for all projects creating and/or replacing 10,000 S.F. or more of impervious surface (collectively over the entire project site). The developer shall reserve a minimum of 4% of developable surface area for the placement of low impact development measures, for storm water treatment, unless an alternative storm water treatment plan, that satisfies C.3 requirements, is approved by the Director of Public Works. The developer must include the use and maintenance of site design, source control and storm water treatment Best Management Practices (BMPs), which must be designed per approved numeric sizing criteria. A Storm Water Management Plan, Storm Water Facilities Easement Agreement, Storm Water Facilities Operation and Maintenance Agreement, and certification of ongoing operation and maintenance of treatment BMPs are each required. All storm water management plans are required to obtain certification from a City approved third party reviewer. 18. TRASH, RECYCLYING AND COMPOST ENCLOSURES Trash enclosure plans must be designed in accordance with the City’s Public Works Guidelines posted at www.cupertino.org/nowaste, and to the satisfaction of the Resolution No. ____ ASA-2018-18 (EA-2018-05) August 9, 2018 Page 9 Environmental Programs Manager. Clearance by the Public Works Department is required prior to obtaining a building permit (CMC 9.18.210 (H) & (K)). 19. OPERATIONS & MAINTENANCE AGREEMENT Developer shall enter into an Operations & Maintenance Agreement with the City prior to final occupancy. The Agreement shall include the operation and maintenance for non-standard appurtenances in the public road right-of-way that may include, but is not limited to, sidewalk, pavers, and street lights. 20. UNDERGROUND UTILITIES Developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate with affected utility providers for installation of underground utility devices. Developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the Director of Public Works. 21. TRANSFORMERS New electrical transformers, telephone cabinets and similar equipment shall be placed in underground vaults. The developer must receive written approval from both the Public Works Department and the Community Development Department prior to installation of any above ground equipment. Should above ground equipment be permitted by the City, equipment and enclosures shall be screened with fencing and landscaping such that said equipment is not visible from public street areas, as determined by the Community Development Department. Transformers shall not be located in the front or side building setback area. 22. WATER BACKFLOW PREVENTERS Domestic and Fire Water Backflow preventers and similar above ground equipment shall be placed away from the public right of way and site driveways to a location approved by the Cupertino Planning Department, Santa Clara County Fire Department and the water company. 23. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMPs), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in grading and street improvement plans. 24. EROSION CONTROL PLAN Developer must provide an approved erosion control plan by a Registered Civil Engineer. This plan should include all erosion control measures used to retain materials on site. Erosion control notes shall be stated on the plans. Resolution No. ____ ASA-2018-18 (EA-2018-05) August 9, 2018 Page 10 25. WORK SCHEDULE Every 6 months, the developer shall submit a work schedule to the City to show the timetable for all grading/erosion control work in conjunction with this project. 26. TRAFFIC CONTROL PLAN The developer must submit a traffic control plan by a Registered Traffic Engineer to be approved by the City. The plan shall include a temporary traffic control plan for work in the right of way as well as a routing plan for all vehicles used during construction. All traffic control signs must be reviewed and approved by the City prior to commencement of work. The City has adopted Manual on Uniform Traffic Control Devices (MUTCD) standards for all signage and striping work throughout the City. 27. STREET TREES Street trees shall be planted within the Public Right of Way to the satisfaction of the Director of Public Works and shall be of a type approved by the City in accordance with Ordinance No. 125. 28. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City. 29. SANTA CLARA COUNTY FIRE DEPARTMENT A letter of clearance for the project shall be obtained from the Santa Clara County Fire Department prior to issuance of building permits. Clearance should include written approval of the location of any proposed Fire Backflow Preventers, Fire Department Connections and Fire Hydrants (typically Backflow Preventers should be located on private property adjacent to the public right of way, and fire department connections must be located within 100’ of a Fire Hydrant). 30. FIRE HYDRANT Fire hydrants shall be located as required by the City and Santa Clara County Fire Department as needed. 31. CALIFORNIA WATER SERVICE COMPANY CLEARANCE Provide California Water Service Company approval for water connection, service capability and location and layout of water lines and backflow preventers before issuance of a building permit approval. Resolution No. ____ ASA-2018-18 (EA-2018-05) August 9, 2018 Page 11 32. DEDICATION OF UNDERGROUND WATER RIGHTS Developer shall “quit claim” to the City all rights to pump, take or otherwise extract water from the underground basin or any underground strata in the Santa Clara Valley. 33. SANITARY DISTRICT A letter of clearance for the project shall be obtained from the Cupertino Sanitary District prior to issuance of building permits. 34. UTILITY EASEMENTS Clearance approvals from the agencies with easements on the property (including PG&E, AT&T, and California Water Company, and/or equivalent agencies) will be required prior to issuance of building permits. 35. WASTE TRIO AND CIGARETTE BUTT URN Waste trio and cigarette butt urn manufacturer specifications must be provided to the Environmental Programs Division for review. Location of waste trio must be located entirely on private property and in proximity to pedestrian use of the sidewalk. Clearance by the Public Works Department is required prior to obtaining a building permit. 36. STORM DRAINS All exterior storm drain inlets on the parcel must be fitted with full trash capture storm drain catch basin inlet devices to prevent litter from entering the storm drain system. Devices installed must be approved by the California State Water Board and selected from the San Francisco Bay Regional Water Quality Control Board list, which can be viewed at http://www.sfestuary.org/approved-trash-capture-devices. Please include with the resubmittal, the manufacturer specification sheet for all trash capture device(s) included with the project. As a condition of approval, the devices must be installed and maintained (cleaned) in accordance with the manufacturer specifications, but not less than two times per year. The property owner must provide official written record of cleaning and maintenance to the City upon request. 37. STORM DRAIN INLET MARKERS All exterior storm drain inlets on the property shall be clearly marked with “No Dumping Flows to Creek” or “No Dumping Flows to Bay” markers. Resolution No. ____ ASA-2018-18 (EA-2018-05) August 9, 2018 Page 12 38. COPPER USES PROHIBITED Copper metal roofing, copper granule containing asphalt shingles, copper gutters and downspouts, and/or other exterior ornamental copper are not permitted for use on any commercial or industrial building. 39. C&D WASTE MANAGEMENT PLAN A completed C&D Waste Management Plan must be submitted at the time of building permit issuance. If the applicant and/or their contractor and any subcontractor working on the project self-hauls the C&D material, a Waste Management Report must be submitted prior to final approval of the building permit demonstrating a minimum of 65% of the C&D waste has been diverted from landfill and recycled. Please note that C&D debris box service may only be obtained from Recology, the City’s franchised waste hauler. C&D Recycling information and reports may be viewed at www.cupertino.org/greendev. 40. RECOLOGY REVIEW The location, path of travel, and associated design features of the on-site trash enclosure will be required to be reviewed by Recology, the City’s franchised waste hauler, and approved by the Public Works Department prior to building permit issuance. SECTION V: CONDITIONS ADMINISTERED BY THE BUILDING DEPT. 41. ACCESSIBLE PATH OF TRAVEL The applicant shall provide accessible path-of-travel from the building to the trash enclosure per 2016 California Building Code. SECTION VI: CONDITIONS ADMINISTERED BY SANTA CLARA COUNTY FIRE DEPT. 42. FIRE SPRINKLERS Certain structures may require fire sprinkler coverage under exterior roof overhangs. Such areas must be reviewed by a properly licensed contractor. If the fire sprinkler system is to be modified, a State of California licensed (C-16) Fire Protection Contractor shall submit plans, calculations, a completed permit application and appropriate fees to the Santa Clara County Fire Department for review and approval prior to beginning their work. 43. CONSTRUCTION SITE FIRE SAFETY All construction sites must comply with applicable provisions of our Standard Detail and Specification SI-7 and Chapter 33 of the currently adopted edition of the Resolution No. ____ ASA-2018-18 (EA-2018-05) August 9, 2018 Page 13 California Fire Code. This must be submitted to and approved by this office prior to commencing any demolition/construction activities. 44. PUBLIC FIRE HYDRANT(S) REQUIRED Identify the location of the existing public fire hydrant(s). Maximum hydrant spacing shall be 500 feet, with a minimum single hydrant flow of 1,750 GPM at 20 psi, residual. Fire hydrants shall be provided along required fire apparatus access roads and adjacent public streets within 100’ of the fire department connection (FDC). 45. WATER SUPPLY REQUIREMENTS Potable water supplies shall be protected from contamination caused by fire protection water supplies. It is the responsibility of the applicant and any contractors and subcontractors to contact the water purveyor supplying the site of such project, and to comply with the requirements of that purveyor. Such requirements shall be incorporated into the design of any water-based fire protection systems, and/or fire suppression water supply systems or storage containers that may be physically connected in any manner to an appliance capable of causing contamination of the potable water supply of the purveyor of record. Final approval of the system(s) under consideration will not be granted by this office until compliance with the requirements of the water purveyor of record are documented by that purveyor as having been met by the applicant(s). 46. ADDRESS IDENTIFICATION New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall be a minimum of 4 inches (101.6 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). PASSED AND ADOPTED this 9th day of August, 2018 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. Resolution No. ____ ASA-2018-18 (EA-2018-05) August 9, 2018 Page 14 ATTEST:APPROVED: Catarina Kidd Benjamin Fu Senior Planner Asst. Director of Community Development CARLSBAD FRESNO IRVINE LOS ANGELES PALM SPRINGS POINT RICHMOND RIVERSIDE ROSEVILLE SAN LUIS OBISPO 157 Park Place, Pt. Richmond, California 94801 510.236.6810 www.lsa.net MEMORANDUM DATE: July 20, 2018 TO: Piu Ghosh, AICP, and Catarina Kidd, City of Cupertino FROM: Judith Malamut, AICP, Principal, LSA SUBJECT: Eighth Addendum to the Apple Campus 2 Project Final Environmental Impact Report (EIR), State Clearinghouse # 2011082055 This memorandum, prepared pursuant to the California Environmental Quality Act (CEQA), is an Eighth Addendum to the certified Apple Campus 2 Project Final EIR.1 For a description of previous addendums, please see the Previous Addendums section below. This Eighth Addendum to the Final EIR evaluates proposed changes (minor modifications) in the design of a previously approved office building and supporting parking in Phase 2 Site B of the Apple Campus 2 (now called Apple Park) project. The proposed changes are described more fully, below, in Minor Modification to the Project. The revised land uses for Phase 2 Site B would involve the construction of a two-story office building supported by a ground-level lot and three-stories of underground parking, as described more fully below. Figure 1, provided by the applicant in the Apple Campus 2 – Phase 2, North Tantau Ave – Site B, Site & Architectural Review application dated February 2018, provides information concerning the location of Phase 2 Site B, shown on the left side of the figure. On the right side of Figure 1, information is provided regarding the previously approved project (column labeled Development Permit October 2013), the 2016 approvals for Sites C and D (approved under the Third Addendum to the Final EIR), and the proposed minor modifications to Site B (column labeled Architecture/Site Review January 2018 (Site B)) the subject of this Addendum. Figure 2 shows the previously approved Phase 1 and 2 development on Site B, the site plan, and elevations showing the approved two-story office building, and the one-level of underground parking, and the above ground two-level parking garage on the eastern portion of the site. Figure 3 shows the conceptual Phase 2 Site B site plan being proposed (i.e., a two-story office building with a ground level parking lot and three levels of underground parking). The Final EIR, which was certified on October 15, 2013, analyzed the environmental impacts of development of a new campus for Apple on a 176-acre site bordered generally by East Homestead Road on the north, North Tantau Avenue on the east, Interstate 280 (I-280) and The Hamptons apartments on the south, and North Wolfe Road on the west. The approved Apple Campus 2 project involves demolition of all existing structures within the project site and the construction of 1 LSA Associates, Inc., 2013. Apple Campus 2 Project Final Environmental Impact Report. September. 7/20/18 (P:\COC1802 8 Addendum Apple\PRODUCTS\Eighth Addendum\7-20-18 Draft Apple Eighth Addendum.docx) 2 3,420,000 square feet of office, research, and development uses; 245,000 square feet of auditorium, fitness center, and valet parking reception uses; 92,000 square feet of utility plants; and parking and ancillary buildings. Significant environmental impacts were identified in the following topical areas: Planning Policy; Land Use; Biological Resources; Cultural Resources; Geology, Soils, and Seismicity; Hydrology and Water Quality; Hazards and Hazardous Materials; Transportation and Circulation; Noise; Air Quality; and Public Services and Utilities. This Eighth Addendum has been prepared pursuant to CEQA Guidelines Section 15164 which states: “The lead agency or a responsible agency shall prepare an addendum to a previously certified EIR if some changes or additions are necessary, but none of the conditions described in Section 15162 calling for preparation of a subsequent EIR have occurred.” Section 15162 specifies that “no subsequent EIR shall be prepared for that project unless the lead agency determines … one or more of the following”: 1. Substantial changes are proposed in the project which would require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; 2. Substantial changes occur with respect to the circumstances under which the project is under- taken which would require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or 3. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete was adopted, shows any of the following: (A) The project would have one or more significant effects not discussed in the previous EIR; (B) Significant effects previously examined would be substantially more severe than shown in the previous EIR; (C) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or (D) Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environ- ment, but the project proponents decline to adopt the mitigation measure or alternative. Pursuant to CEQA Guidelines Section 15164(e), the following discussion describes the final designs and any minor modifications and briefly explains that no impacts would be associated with the proposed changes identified in the design applications for the ancillary buildings, and the reasons for the City’s conclusion that changes to the proposed project (and associated environmental effects) do not meet the conditions described in Sections 15162 and 15163 calling for preparation of a Subsequent EIR or a Supplement to an EIR. 7/20/18 (P:\COC1802 8 Addendum Apple\PRODUCTS\Eighth Addendum\7-20-18 Draft Apple Eighth Addendum.docx) 3 MINOR MODIFICATIONS TO THE PROJECT The following describes the proposed minor changes to the approved development program for Phase 2 Site B that was analyzed in the Final EIR, as amended by the First through Seventh Addenda, and approved by the City. This section also identifies the reasons why the proposed design and construction of these ancillary buildings would not result in new or substantially more severe significant environmental effects beyond those identified in the Final EIR. The project applicant is requesting site approval for the following: • Phase 2 Site B Office Building. As shown in the Apple Campus 2 – Phase 2 North Tantau Ave – Site B Site & Architectural Review document submitted by the applicant in February 2018,2 the applicant is proposing to construct a two-story (36 feet in height) office building, that would include 69,386 square feet of office space and 15,861 square feet of amenity space for a total gross area of 85,247 square feet. Figures 4 and 5 provide conceptual development sections for the proposed modifications. Figure 6 provides a conceptual Phase 2 Site B rendered elevation. • Phase 2 Site B Parking. The Phase 2 Site B office building would be supported by the development of 165 spaces of surface parking and three levels of underground parking that would provide 435 spaces for a total of 600 spaces. The proposed project provides minor modifications to the Phase 2 Site B development evaluated in the Final EIR, the changes in regards to building area, parking spaces, site area and excavation are identified in Table 1, below. Table 1: Phase 2 Site B Approved and Proposed Modifications Parameters Approved 2013 Final EIR Proposed 2018 Application Net Difference Primary Use Office/R&D Office/R&Da -- Gross Building Area 87,000 sf 85,247a sf 1,755 sf Number of Employees 800 500 300 Surface Parking Spaces 200 165 35 Parking Structure Spaces 200 0 200 Underground Parking Spaces 200 435 235 Total Parking Spaces 600 600 0 Office Building Height 35 feet (2 stories) 36 feet (2 stories) 1 foot Parking Structure Height 15 feet (I level above ground level) 0 15 feet Excavation of Materialb 20,000 cy 88,000 cy 68,000 cy Source: Foster + Partners, 2018. Apple Campus 2 North Tantau Ave – Site B Site & Architectural Review. February. a The proposed gross square feet of building area also includes 15,861 of amenity space. b The excavation of material was identified by Ramboll Environ as the remaining amounts after construction of Phase 2 Sites C and D. See their June 2018 memorandum attached to this Addendum. 2 Foster + Partners, 2018. Apple Campus 2 North Tantau Ave – Site B Site & Architectural Review. February. 7/20/18 (P:\COC1802 8 Addendum Apple\PRODUCTS\Eighth Addendum\7-20-18 Draft Apple Eighth Addendum.docx) 4 While there would be an addition of 15,861 square feet of amenity space, the primary office/R&D use would not change, and the gross square footage that was approved would slightly decrease by 1,753 square feet (approved 87,000 square feet – 85,247 square feet). The number of employees would also be reduced (approved 800 employees – proposed 500 employees). The Final EIR also evaluated the effects of construction of 200 surface parking spaces, 200 spaces in an above ground parking structure, and 200 underground spaces (see Figure 2) for a total of 600 spaces. While the same number of parking spaces would be provided (600) for the approved and proposed Phase 2 Site B, the number of surface parking spaces would be reduced (approved 200 – proposed 165), and the majority of spaces would be underground (435) rather than in an aboveground parking structure, resulting in beneficial reductions in operational parking noise effects on neighboring uses to the east of the site. The excavation needed to construct the proposed larger underground parking area and off-haul of the additional material would increase from the approved and remaining 20,000 cubic yards (CY) to 88,000 CY, and off-haul would increase by the same amount. The environmental effects of this change in the amount of excavation and associated construction and truck trips were evaluated and are discussed below. COMPARISON TO THE CONDITIONS LISTED IN CEQA GUIDELINES SECTIONS 15162 AND 15163 The following discussion summarizes the reasons that a Subsequent EIR or Supplement to the EIR, pursuant to CEQA Guidelines Sections 15162 and 15163, is not required to evaluate the environmental effects of the currently-proposed minor design and construction modifications to the project evaluated in the Final EIR. Substantial Changes to the Project As discussed above, the major change associated with the Phase 2 Site B proposal to construct an office building and three-stories of underground parking is the resulting additional excavation and off-hauling (an additional 68,000 cubic yards) and associated truck trips than was originally analyzed in the Final EIR as amended and approved by the City. The off-hauling would require approximately 6,800 additional truck trips that were not accounted for in the Final EIR. The duration of Phase 4 of the Apple Park project (within which the Phase 2 development was included) was anticipated to occur over 12 months in the Final EIR, and with the modifications to Phase 2 Site B of the project, the duration of Phase 4 would be approximately 17 months. Because the proposed design and construction of the office building and three levels of underground parking would result in more excavation and off-hauling than was originally analyzed in the Final EIR as amended and approved by the City, the only environmental issues related to this change would be potential changes in air quality, noise, and traffic impacts associated with the additional excavation. Air Quality To address air quality issues, Ramboll Environ prepared a technical memorandum analyzing the air quality impacts of the proposed modifications titled Construction Emission Evaluation Impacts of Revised Phase 4 (May 17, 2017, updated June 2018), attached to this memorandum. The Ramboll Environ analysis concluded the following: 7/20/18 (P:\COC1802 8 Addendum Apple\PRODUCTS\Eighth Addendum\7-20-18 Draft Apple Eighth Addendum.docx) 5 • The modifications to Phase 2 Site B would not result in an increase in average daily construction related criteria pollutant emissions. • The modifications to Phase 2 Site B would not result in a change to the cancer risk significance findings included in the Final EIR. Traffic As noted above, the proposed Phase 2 Site B modifications to the project would require additional haul truck trips to transport off-haul associated with the construction of underground parking. As identified in the Final EIR, truck access to the site would be restricted during the peak commute times (7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 7:00 p.m.) to minimize potential impacts to the surrounding roadway network operations. As described above, the timeframe for project construction would increase from 12 months to 17 months to allow for construction activities associated with Phase 2 Site B. As identified in the Final EIR, all truck access on Homestead Road would be restricted and trucks would access the project site via the I-280/Wolfe Road interchange. All truck travel would be consistent with the City’s Municipal Code (Section 11.32.010). Only construction workers would access the project from the north from Wolfe Road and/or Homestead Road. With the extended duration of the construction period, construction truck traffic would not exceed the peak truck activity evaluated in the Final EIR. No significant impacts related to construction traffic would occur and no additional mitigation measures are required. Noise The closest noise-sensitive receptors to the proposed Phase 2 Site B project component are single- family residential land uses east of the site fronting on Meadow Avenue, whose rear property lines would be located adjacent to the proposed construction areas. Noise levels during construction of the modified project would be similar to those anticipated for the approved project as identified in the Final EIR. The 35-foot landscaped setback would remain under the proposed Phase 2 Site B modifications. As identified in the Final EIR, noise levels would range up to 90 dBA Lmax at receptor locations. However, as with the approved project, construction of the proposed Phase 2 Site B modifications would incorporate a 15-foot-high temporary sound wall along the project border adjacent to off-site noise-sensitive land uses for the duration of project construction. As with the approved project, noise levels associated with the modified project would be approximately 76 dBA Lmax, and would be below the City’s threshold of 80 dBA Lmax. The construction duration would be extended with the modified project, however all noise-generating construction activities would be limited to between the hours of 7:00 a.m. and 8:00 p.m. on weekdays, and between the hours of 9:00 a.m. and 6:00 p.m. on weekends. All other measures specified in Mitigation Measure NOI-1 would also be applicable. Implementation of Mitigation Measure NOI-1 as outlined in the Final EIR would reduce construction related noise impacts, including those of the modified project, to a less- than significant level. Additionally, the modified Phase 2 Site B would not include a two-level parking garage adjacent to the single-family uses to the east, and there would be a beneficial reduction in noise associated with parking (e.g., conversations, car alarms, slamming doors) 7/20/18 (P:\COC1802 8 Addendum Apple\PRODUCTS\Eighth Addendum\7-20-18 Draft Apple Eighth Addendum.docx) 6 Summary Therefore the minor modifications to the project would not result in new significant environmental impacts beyond those identified in the Final EIR, would not substantially increase the severity of impacts identified in the Final EIR, and thus would not require major revisions to the Final EIR. Therefore, the proposed changes to the project would be minor refinements to design of the two- story office building and parking garage within Phase 2 Site B, not substantial changes, and an Addendum is the appropriate document to address these minor modifications rather than a Subsequent EIR or a Supplement to the Final EIR. Substantial Changes in Circumstances Construction of the Apple Campus 2 Project has been substantially completed, and Phase 2 Site B is the final site to be designed and implemented. Environmental conditions in and around the project site have not changed such that implementation of the proposed minor modifications to the project would result in new significant environmental effects or a substantial increase in the severity of environmental effects identified in the Final EIR, and thus major revisions to the Final EIR are not required due to substantial changes in circumstances. New Information No new information of substantial importance, which was not known and could not have been known when the Final EIR was certified, has been identified to show that the proposed minor design modifications to the project would be expected to result in: 1) new significant environmental effects not identified in the Final EIR; 2) substantially more severe environmental effects than shown in the Final EIR; 3) mitigation measures or alternatives previously determined to be infeasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project sponsor declines to adopt the mitigation measure or alternative; or 4) mitigation measures or alternatives that are considerably different from those identified in the Final EIR would substan- tially reduce one or more significant effects of the project, but the project sponsor declines to adopt the mitigation measure or alternative. In addition, the proposed minor design modifications to the project would require no new mitigation measures because no new or substantially more severe impacts are expected beyond those identified in the Final EIR. Existing regulations (including City of Cupertino General Plan policies and Zoning Ordinance regulations) and mitigation measures adopted and made conditions of project approval would continue to apply. 7/20/18 (P:\COC1802 8 Addendum Apple\PRODUCTS\Eighth Addendum\7-20-18 Draft Apple Eighth Addendum.docx) 7 CONCLUSION The proposed designs for the Phase 2 Site B two-story office building and three stories of underground parking for the Apple Campus 2 Project described in this Eighth Addendum would not require major revisions to the Final EIR, as amended by the First through Seventh Addenda, due to new or substantially increased significant environmental effects. There have been no substantial changes with respect to the circumstances under which these minor modifications would be undertaken that would require major revisions of the Final EIR due to new or substantially increased significant environmental effects, and there has been no discovery of new information of substantial importance that would trigger or require major revisions to the Final EIR due to new or substantially increased significant environmental effects. Therefore, no subsequent or supplemental EIR is required prior to approval of the Phase 2 Site B office building and underground garage component of the Apple Campus 2 Project, as described in this Eighth Addendum. PREVIOUS ADDENDUMS A previous First Addendum to the Final EIR was adopted by the City on April 9, 2014, in connection with the City’s approval of minor modifications to the dimensions, geometry and footprint of several site buildings, a reduction of parking spaces, and the addition of a Security Operations Center.3 A Second Addendum to the Final EIR was adopted by the City in September 2014 in connection with the City’s approval of minor modifications to the Corporate Auditorium, Corporate Fitness Center, and Central Plant Equipment Yard.4 A Third Addendum to the Final EIR was adopted by the City in November 2014 in connection with the City’s approval of minor modifications to the Phase 2 North Tantau Avenue Sites C and D portion of the project and included revisions to the configuration of buildings, the placement of parking, and tree removal and landscaping.5 A Fourth Addendum to the Final EIR was adopted by the City in July 2015 in connection with the City’s approval of minor modifications to North Tantau Avenue Phase 1 Site A, including the replacement of valet reception and parking uses with a visitor center/store and parking, and increasing the number of parking spaces and moving most of the parking from a structured building to a garage below the visitor center.6 3 LSA Associates, Inc., 2014. Addendum to the Apple Campus 2 Project Final Environmental Impact Report. April 4. 4 LSA Associates, Inc., 2014. Second Addendum to the Apple Campus 2 Project Final Environmental Impact Report. September 15. 5 LSA Associates, Inc., 2014. Third Addendum to the Apple Campus 2 Project Final Environmental Impact Report. November 4. 6 LSA Associates, Inc., 2015. Fourth Addendum to the Apple Campus 2 Project Final Environmental Impact Report. July 2. 7/20/18 (P:\COC1802 8 Addendum Apple\PRODUCTS\Eighth Addendum\7-20-18 Draft Apple Eighth Addendum.docx) 8 A Fifth Addendum to the Final EIR was adopted by the City in August 2015 and addressed modifications to Phase 2 office buildings, a parking structure and a satellite plant.7 A Sixth Addendum to the Final EIR was adopted by the City in April 2016 in connection with the City’s approval of additional proposed modifications to the Apple Campus 2 Phase 2 North Tantau Avenue Sites C and D portion of the project.8 A Seventh Addendum to the Final EIR was adopted by the City in April 2016 and evaluated final designs for ancillary buildings including a small maintenance shed, two security/reception buildings, and two outdoor food stations associated with the Apple Campus 2 project.9 7 Chao, Gary, Assistant Director of Community Development and Ghosh, Piu, Senior Planner, City of Cupertino. 2015. Staff Report: Director’s Minor Modification (DIR-2015-15) to allow modifications to a previously approved office building, parking structure and satellite plant as part of Phase 2 of an office, Research and Development Campus located at 10300 and 10435 N. Tantau Avenue. August 4. 8 LSA Associates, Inc., 2016. Sixth Addendum to the Apple Campus 2 Project Final Environmental Impact Report. March 16. As revised per Community Development Department Edits on April 7, 2016. 9 LSA Associates, 2016. Seventh Addendum to the Apple Campus 2 Project Final Environmental Impact Report. April 7. NOT TO SCALEFIGURE 1SOURCE: APPLE 2018.I:\COC1802 Apple Addendum 8\figures\Fig_1.ai (7/10/18)Apple Campus 2 Project EIR Eighth AddendumPhase 2 Site B - LocaƟon Site BFEET100050FIGURE 2SOURCE: APPLE 2018.I:\COC1802 Apple Addendum 8\figures\Fig_2.ai (7/10/18)Apple Campus 2 Project EIR Eighth AddendumPreviously Approved Phase 2 Site B NOT TO SCALEFIGURE 3SOURCE: APPLE 2018.I:\COC1802 Apple Addendum 8\figures\Fig_3.ai (7/10/18)Apple Campus 2 Project EIR Eighth AddendumConceptual Phase 2 Site B Site Plan NOT TO SCALEFIGURE 4SOURCE: APPLE 2018.I:\COC1802 Apple Addendum 8\figures\Fig_4.ai (7/11/18)Apple Campus 2 Project EIR Eighth AddendumConceptual Phase 2 Site B SecƟon A NOT TO SCALEFIGURE 5SOURCE: APPLE 2018.I:\COC1802 Apple Addendum 8\figures\Fig_5.ai (7/11/18)Apple Campus 2 Project EIR Eighth AddendumConceptual Phase 2 Site B SecƟon B NOT TO SCALEFIGURE 6SOURCE: APPLE 2018.I:\COC1802 Apple Addendum 8\figures\Fig_6.ai (7/11/18)Apple Campus 2 Project EIR Eighth AddendumConceptual Phase 2 Site B Rendered ElevaƟon 7/17/18 (C:\Users\JMalamut\Desktop\projects\apple\7-16-18 Draft Apple Eighth Addendum.docx) 15 APPENDIX A PEER REVIEW OF THE RAMBOLL ENVIRON APPLE CAMPUS 2 CONSTRUCTION EMISSIONS EVALUATION CARLSBAD FRESNO IRVINE LOS ANGELES PALM SPRINGS POINT RICHMOND RIVERSIDE ROSEVILLE SAN LUIS OBISPO 7086 North Maple Avenue, Suite 104, Fresno, California 93720 559.490.1210 www.lsa.net MEMORANDUM DATE: July 17, 2018 TO: Judith Malamut, Principal FROM: Amy Fischer, Principal SUBJECT: Peer Review of the Ramboll Environ Apple Campus 2 Construction Emissions Evaluation Per the City of Cupertino’s (City’s) request, LSA has reviewed the updated and attached Ramboll Environ memorandum 1 that reviewed construction emissions associated with the minor modifications to the proposed Phase 2 Site B component of the Apple Campus 2 Project evaluated in the Apple Campus 2 Final EIR (Final EIR).2 In summary, LSA has reviewed the Ramboll Environ evaluation and has determined that the calculations are accurate and their analysis method presents the estimated updated cumulative risk based on the modeling assumptions and methodologies used in the Final EIR analysis. LSA agrees with these findings and has determined that the minor modifications proposed for the Phase 2 Site B component of the project evaluated in the Final EIR would not result in new or substantially more adverse impacts related to the exposure of sensitive receptors to pollutant concentrations associated with the excavation and off-haul associated with the proposed Phase 2 Site B modifications. Construction of the office building and three-stories of underground parking would result in more excavation (an additional 63,000 cubic yards) and off-hauling (an additional 68,000 cubic yards) and associated truck trips than was originally analyzed in the Final EIR as amended and approved by the City. Therefore, Ramboll Environ prepared an analysis of the change in criteria pollutant emissions and health risk that would occur with implementation of the modified project. CRITERIA AIR POLLUTANTS The construction of the Phase 2 Site B component is included in the Phase 4 construction schedule. Ramboll Environ approached the analysis of criteria air pollutant emissions by substituting the revised Phase 4 emissions associated with the proposed, revised project for the Phase 4 emissions previously identified in the Final EIR in its air quality modeling. Ramboll Environ averaged the emissions over the length of the updated construction schedule, which is consistent with Bay Area 1 Ramboll Environ, 2017. Construction Emission Evaluation Impacts of Revised Phase 4 Memorandum. Updated June 2018. 2 LSA Associates, Inc., 2013. Apple Campus 2 Project Final Environmental Impact Report. September. 7/20/18 (P:\COC1802 8 Addendum Apple\PRODUCTS\Eighth Addendum\7-20-18 LSA AQ Memo.docx) 2 Air Quality Management District (BAAQMD) guidance.1 LSA concurs with this approach and finds that the modified project would not result in a new impact related to the release of criteria pollutant emissions during construction. HEALTH RISK ASSESSMENT To determine the construction health risk assessment associated with the Phase 2 Site B component of the project, Ramboll Environ shifted the emissions by year to be consistent with construction-to- date. The Phase 4 emissions previously assumed in the Final EIR were removed for certain years then added back in under the 2+ year age bin. The Office of Environmental Health and Hazard Assessment developed exposure factors (e.g., daily breathing rates) for certain age groups including the last trimester age 2, age 2 to 16, and age 16 to age 70. Age bins allow for more refined exposure information to be used when estimating exposure and the potential for developing cancer over a lifetime.2 Based on the Ramboll Environ memorandum, construction of the project started at the end of 2013 and continued through mid-2017. Construction has since stopped and would be resuming at the Phase 4 location under the proposed Phase 2 Site B planning application. The proposed Phase 4 construction activity would result in higher emissions than previously assumed, and the site is located adjacent to residential receptors. Given the close proximity of sensitive receptors and the extended duration of the construction timeline, there could be new receptors including infants and children that would fall under the 3rd trimester t to age 2 age bin. The 2+ year age bin does not have the age sensitivity risk factors and higher breathing rates that are included under the 3rd trimester to age 2 age bin assumed in the Final EIR cumulative analysis prepared for the project. Ramboll Environ’s June 2018 memorandum accounts for the age sensitivity risk factors by providing a standalone analysis of Phase 4 beginning at the onset of the phase. The analysis was performed consistent with BAAQMD guidance, using methodology from the Final EIR. LSA has reviewed the updated emission rates, exposure parameters, toxicity values, and Phase 4 risk summary. The analysis results conclude the Maximum Exposed Individual (MEI) would be exposed to a construction cancer risk of 2.8 in one million, which is well below the threshold of 10 in one million. The MEI for chronic health impact (HI) would be 0.006, which is well below the threshold of 1.0. The MEI for acute HI would be 0.14, which is also well below the threshold of 1.0. LSA agrees with the findings in the Ramboll Environ memorandum and has determined that no additional impacts would occur with implementation of the modifications to the project. The minor modifications would not result in new significant environmental impacts beyond those identified in the Final EIR, would not substantially increase the severity of impacts identified in the Final EIR, and thus would not require major revisions to the Final EIR. Therefore, the proposed changes to the project would be minor refinements to design of the office building and underground parking and would not require substantial changes to the Final EIR. 1 Bay Area Air Quality Management District, 2017. Air Quality CEQA Guidelines. May. 2 California Air Resources Board, 2015. Risk Management Guidance for Stationary Sources of Air Toxics. May. 7/20/18 (P:\COC1802 8 Addendum Apple\PRODUCTS\Eighth Addendum\7-20-18 LSA AQ Memo.docx) 3 Attachment A: Ramboll Environ Apple Campus 2 Construction Emissions Evaluation Impacts of Revised Phase 4 1019228.2 1/5 Ramboll Environ 201 California Street Suite 1200 San Francisco, CA 94111 USA T +1 415 796 1950 F +1 415 398 5812 www.ramboll-environ.com MEMORANDUM Date:May 17, 2017 [Updated March, 2018] [Updated June, 2018] To:Chris Grimmer From:Michael Keinath Taylor Vencill Subject:Apple Campus 2 Construction Emissions Evaluation Impacts of Revised Phase 4 1.Summary of Prior Analysis and Purpose of Current Evaluation The Apple Campus 2 Project was approved by the Cupertino City Council on October 15, 2013. Consistent with requirements under the California Environmental Quality Act (CEQA), an Environmental Impact Report (EIR) was prepared for the Apple Campus 2 Project. Potential air quality impacts from all phases of construction (Phases 1-4) were specifically evaluated under Impacts AIR-1 (Construction of the proposed project would generate air pollutant emissions that could violate air quality standards), AIR-3 (Construction and operation of the proposed project would result in a significant cumulative net increase in criteria pollutant emissions), and AIR-4 (Without the construction practices identified in the Apple Campus Construction Equipment Summary, construction of the proposed project would expose sensitive receptors to substantial pollutant concentrations). While Impacts AIR-1 and AIR-3 were determined to be significant and unavoidable with mitigation, Impact AIR-4 was determined to be less than significant with mitigation. The proposed modification is consolidated within “Phase 4” of construction, which includes 82,000 square feet of offices and research and development buildings. While the overall changes to building footprints and quantity of parking are not significantly changing between original and updated designs, and in fact are often reduced (see Table 1 below), the new proposed parking will be located underground. The construction of the underground parking structure will require additional excavation and trucking haul trips. As such, Ramboll Environ has prepared the following analysis to evaluate such potential air quality impacts from the revised Phase 4 construction. 2/5 Table 1. Phase 4 Site Parameters Parameter Original Phase 4 Updated Phase 4 Building Area (square feet)84,000 82,000 Parking Structure (spaces)600 600 Other Asphalt Surfaces (square feet)129,979 111,074 Site Area (square feet)197,319 189,271 Excavation Volume (cubic yards)20,000 88,000 2.Criteria Air Pollutant Emissions To evaluate the potential change to conclusions reached under Impacts AIR-1 and AIR-3, criteria air pollutant (CAP) emissions were quantified from the updated Phase 4 construction design. Off-road Emissions Phase 4 off-road emissions were calculated using an updated equipment list that outlined equipment usage, equipment specifications (e.g., horsepower), and equipment controls (e.g. Tier 2 or Tier 3 equipped with diesel particulate filters (DPFs)), as shown in Table 2. When project-specific data was not available, default equipment parameters were applied (e.g. CalEEMod load factors). Emission factors applied were consistent with U.S. EPA off-road engine Tier Standards (CFR 40 1039.102). All off-road equipment in Phase 4 will be equipped with Level 3 DPFs, therefore all emissions were assumed to have 85% particulate matter (PM) and 90% reactive organic gas (ROG) abatement. All off-road calculation methods were consistent with the methods used in the Apple Campus 2 EIR. On-road Emissions On-road hauling and vendor emissions were based on trip data provided to Ramboll Environ, shown in Table 2. Consistent with the Apple Campus 2 EIR, emissions were calculated using ARB’s EMFAC2011 mobile emissions model. The EMFAC calendar year was updated from 2013 to 2017 to reflect the beginning date of Phase 4 construction. Trucks were limited to model years 2007 or newer and running emissions assumed a speed limit of 15 mph, consistent with Mitigation Measure AIR-1. Each one-way haul trip was assumed to be 20 miles in length based on CalEEMod default assumptions and the EIR. On a daily basis, each round-trip was attributed to a new truck, and each truck’s daily idling emissions were ascribed to the Project. Original Project CAP emissions were provided in Table V.L-5 of the Apple Campus 2 EIR. As shown in Table 3 original daily emissions were converted to total Project emissions assuming 4 years of construction. Emissions from architectural coating and paving activities were assumed to be the same between the original and updated Project designs, since the building area, parking structure, and other asphalt surface areas within Phase 4 are either less than or equal to the original Phase 4 design. In all cases, PM2.5 exhaust emissions were conservatively assumed to be equal to PM10 emissions. Fugitive PM emissions were not considered for this analysis as they are not held to the same construction thresholds as exhaust emissions, and are instead addressed through Best Management Practices (BMPs). BMPs are implemented through Mitigation Measure AIR-1, as discussed in the Apple Campus 2 EIR. 3/5 To account for the updated Phase 4 design and construction, original Phase 4 emissions were then substituted with the new Phase 4 emissions, and total emissions were averaged over the full length of the updated construction schedule (see Table 3). Updated Phase 4 emissions increase compared to original emissions, with changes ranging from 48% to 153% across different CAPs. This was largely due to an increase in trip rates to account for the increase in excavation volumes. While Phase 4 increases were notable, the changes represent at most 0.50% of the overall Project emissions. Furthermore, the average daily emissions decrease by 17% due to the longer construction schedule. Overall, updates to Phase 4 emissions do not change the original EIR’s significance findings. 3.Construction Health Risk Assessment To evaluate the potential change to conclusions reached under Impact AIR-4, diesel particulate matter (DPM) emissions were quantified from the updated Phase 4 construction design. Additionally, changes to the construction schedule were evaluated as they relate to potential health impacts. Finally, a new analysis was performed to evaluate impacts if Phase 4 was considered a standalone project with exposure of nearby sensitive receptors beginning at the onset of the Phase. DPM Emissions Original and updated Project DPM emissions were quantified following the same methodology as that outlined for CAP emissions above, where all PM10 emissions were conservatively assumed to be DPM. The only difference in methodology was the trip length assumed for haul routes. Since the health risk evaluation focuses on onsite impacts from construction, the trip lengths considered were as follows: ·Original DPM emissions for the full Project used an average trip length (0.67 miles) of the four Project hauling routes (Staging Road, Material Staging Road, Heavy Equipment Staging Road, and Temporary Road). ·Updated DPM emissions for Phase 4 used 0.5 miles for each one-way trip and conservatively modeled these as on-site emissions since the original Project hauling routes would no longer be applicable to Phase 4 construction. Original and updated Project DPM emissions are shown in Table 4. The proposed changes in construction increase Phase 4 DPM emissions by a total of 23%. Phase 4 on-road emissions increase by more than 100% due to the increase in excavation and associated material hauling, but they represent a small portion of overall Project emissions. While the changes in Phase 4 emissions were proportionally large when compared to the original Phase 4 alone, they represent a small change of total Project DPM emissions (0.13%). Construction Schedule As risk estimates incorporate exposure parameters that vary by age, the timing and duration of construction activity and emissions can affect estimated risk at nearby sensitive receptors. As such, Ramboll Environ not only evaluated the potential impact of the updated Phase 4 design and construction, but also considered how the actual Phase 1-3 activity differed from the original EIR assumptions. The original construction schedule was compared to an updated schedule provided by Apple. The updated schedule included the actual dates of construction activity for Phases 1-3 and an updated plan for Phase 4. Overall, the actual Project construction activity occurred later and was spread out over a longer time period than 4/5 originally modeled. Specifically, Phase 1 construction began 10 months after it was originally planned, and Phase 4 is now moved back by more than a year. Phase 4 now only overlaps with Phase 2 by one month, rather than for the entire duration as was originally evaluated. A summary comparison of the original and updated schedules is shown in Figure 1.1 To evaluate the potential change in potential cancer risk, DPM emissions for the original and updated Project were grouped by age bin and were compared across the original and updated schedule. Consistent with the maximally exposed individual (MEI) evaluated in the EIR, exposure parameters assumed for this evaluation reflect a potential nearby child resident. Accordingly, the two age bins evaluated were 3rd trimester to 2 years old and 2+ years old since the age sensitivity factor (ASF) changes at the 2 year mark. Emissions were considered based on construction subphases and were averaged in cases where a subphase fell within both bins.Table 5 shows a comparison of DPM emissions by age bin for the original and updated construction schedules, as well as the resulting impact on estimated cancer risk. Since there is a negligible increase in overall DPM emissions and the updated construction schedule shifts more emissions to the 2+ age bin, there is a net reduction in estimated potential cancer risk. The new estimated MEI is 9.16 in a million, which remains below the threshold of 10 in a million. For purposes of this analysis, given the sources of emissions are diesel construction equipment engines and diesel on-road truck engines, if cancer risk from DPM remains below the threshold, then non-cancer chronic and acute HI, as well as fine particulate matter (PM2.5) concentrations will also remain below thresholds. For this reason, only the change in excess lifetime cancer risk is evaluated here. Phase 4 Standalone Project An additional analysis was performed to evaluate excess lifetime cancer risks for Phase 4 construction as though Phase 4 was a standalone project. As described above, the revised construction schedule causes most Phase 4 DPM emissions to occur after age 2 for an exposure analysis that begins with the start of Phase 1 construction. Since the ASF is highest before age 2, health risks from Phase 4 construction are low when evaluating Phases 1 through 4 as a whole. This analysis evaluates the potential health risks from Phase 4 if instead the most sensitive age groups were exposed to Phase 4 construction. The same emissions were calculated for Phase 4 as described above for the updated Project. The emissions are conservative (slightly overestimated), because the on-road emission factors would be lower if updated to reflect the later calendar years of construction due to the revised schedule. Table 6 shows the annual average and maximum hourly emissions used for the health risk assessment. Overall methodology utilized in this analysis remains consistent with the EIR, but dispersion patterns from Phase 4 construction activies were remodeled to use the latest versions (18081) of the American Meteorological Society/Environmental Protection Agency Regulatory Model (AERMOD) and its meteorological preprocessor AERMET. The source parameters were consistent with the EIR, but only the Phase 4 construction volume sources were included in the model (both offroad and onroad emissions were allocated to this area). The same receptors modeled in the EIR 1 [Updated March, 2018]. The new proposed schedule now pushes Phase 4 back by two years relative to the original schedule and does not overlap with any other phases. Figure 1 has been updated to show the new proposed schedule of Q2 2018 through Q3 2019. As described further in the table footnotes, this update does not change the conclusions presented in this memorandum. 5/5 were evaluated here at heights of zero feet, six feet, and 20 feet.Figure 2 shows the source and receptor setup. The risk assessment methodology is consistent with and described in more detail in the EIR. Consistent with the MEI evaluated in the EIR, this evaluation evaluates a nearby child resident, assuming exposure starting from the 3rd trimester at the start of Phase 4 construction. Accordingly, the age bin evaluated is 3rd trimester to 2 years old. Emissions were averaged across the Phase 4 construction sub-phases.Table 7 shows the exposure parameters used to calculate the inhalation factor.Table 8 shows toxicity values used to evaluate risk. As shown in Table 9, the estimated MEI from Phase 4 construction for cancer risk is 2.8 in a million, which is well below the threshold of 10 in a million. The MEI for chronic health impact (HI) is 0.006, which is well below the threshold of 1.0. The MEI for acute HI is 0.14, which is well below the threshold of 1.0. 4.Conclusion The proposed updates to the design and construction of Phase 4 do not change the significance findings of the original Apple Campus 2 EIR. Ramboll Environ TABLES Table 2 Updated Phase 4 Equipment and Trip Data Apple Campus 2 Phase 4 Updates Cupertino, CA Phase Type Phase Detail OFFROAD Equipment Type Year Quantity Operating Hours per Day Total Work Days HP Load Factor Engine Tier2 Daily Round Trips Total One-Way Trips Excavators 2017 2 8 65 300 0.38 2 Crawler Tractors 2017 1 8 44 220 0.43 2 Other Construction Equipment 2017 1 4 44 380 0.42 2 Graders 2017 1 8 44 260 0.41 2 Rollers 2017 1 4 21 100 0.38 2 Graders 2017 1 4 22 260 0.41 2 Rollers 2017 1 4 22 100 0.38 3 Scrapers 2017 1 4 22 275 0.48 2 Rubber Tired Loaders 2017 1 4 22 78 0.36 2 Rubber Tired Loaders 2017 1 4 22 78 0.36 2 Rollers 2017 1 4 22 78 0.38 2 Graders 2017 1 4 22 260 0.41 2 Scrapers 2017 1 4 22 275 0.48 2 Paving Equipment 2018 1 4 22 200 0.36 3 Rollers 2018 1 4 22 100 0.38 2 Rubber Tired Loaders 2018 1 4 22 78 0.36 3 Other Construction Equipment 2018 1 4 22 325 0.42 2 Other Concrete Pumping Other Construction Equipment 2018 1 4 43 430 0.42 2 ---- Cranes 2018 1 6 21 284 0.29 2 Forklifts 2018 1 6 21 125 0.20 2 Exterior Skin Graders 2018 1 4 66 124 0.41 3 0.20 26 Notes: 1 2 3 Abbreviations: hp - horsepower Trips reflect both hauling and vendor trips. Trips assumed to have a default trip length of 20 miles per one-way trip. Engine DataEquipment Usage Data1 220.50 0.50 22 0.65 27 Base Rock Work - St & Plot Rough Grade Site Structure & Site Demolition 15 1,950 -- All engines are diesel-fueled with Diesel Particulate Filters. [Updated March, 2018]. The previously proposed schedule for Phase 4 (8/2017 - 8/2018) is now scheduled to occur from Q2 2018 through Q3 2019. However, total off- road equipment activity and on-road hauling and vendor trips will remain the same as evaluated here. -- 0.50 22 On-Road1,3 Building Construction Paving Grading Demolition Steel Erection Asphalt Concrete Paving PCC Flatwork Cushion Emissions Units NOx ROG PM10 PM2.5 Average Daily Exhaust Emissions lbs/day 181.2 6.1 1.8 1.8 Average Daily Architectural Coating Emissions lbs/day 0 179.9 0 0 Average Daily Emissions lbs/day 181.2 186.0 1.8 1.8 Original Phases 1 through 4 Total Emissions1 tons 132 136 1.30 1.30 (–) Original Phase 4 Exhaust Emissions tons 1.37 0.04 0.01 0.01 (+) Updated Phase 4 Exhaust Emissions2 tons 2.03 0.11 0.01 0.01 Updated Phases 1 through 4 Total Emissions3,4 tons 133 136 1.30 1.30 Total Construction Days (Updated Schedule)5 days Average Daily Emissions lbs/day 151 154 1.5 1.5 Change in Phase 4 Emissions %48%154%49%49% Change in Total Emissions %0.50%0.05%0.32%0.32% Change in Average Daily Emissions %-17%-17%-17%-17% Notes: 1 2 3 4 5 Abbreviations: lbs/day - pounds per day NOX - nitrogen oxides ROG - reactive organic gases PM10 - particulate matter <10 microns PM2.5 - particulate matter <2.5 microns Total Construction Days will increase with the new proposed schedule (Q2 2018 through Q2 2019) to 2,159 days. Therefore, Phase 4 average daily emissions decrease by 18% in comparison to Updated Schedule emissions shown above and 32% in comparison to original Phase 4 emissions. Cupertino, CA Apple Campus 2 Phase 4 Updates Daily CAP Emissions, Updated Phase 4 & Overall Schedule Table 3 1764 Emissions from architectural coating and paving activities were assumed to be the same between the original and updated Project designs, since the building area, parking structure, and other asphalt surface areas within Phase 4 are either less than or equal to the original Phase 4 design. Updated Phase 1-4 Total Emissions were calculated as follows: Original Phases 1 through 4 Total Emissions (-) Original Phase 4 Exhaust Emissions (+) Updated Phase 4 Exhaust Emissions. Original Phase 1-4 Total Emissions were calculated as follows: Average Daily Emissions (lbs/day) * (365*4) days / 2000 (lbs/ton). Original EIR Changes in Emissions Updated Daily Averages Phase 4, Updated Project Totals [Updated March, 2018]. Phase 4 exhaust emissions were calculated for off-road equipment and on-road vehicles using the previously proposed schedule which spanned 2017 and 2018. While off-road emissions are defined by Tier level and are not dependent on year, on-road emissions incorporated here are conservative for the new proposed schedule of Q2 2018 through Q3 2019 as on-road fleets continue to improve each year. Table 4 DPM Emissions Scenarios for Health Risk Analyses Apple Campus 2 Phase 4 Updates Cupertino, CA Running Idling Phase 1 - Main Campus 2,551 23 134 8 2,716 Phase 2 - 200K sf E. of Tantau 16 0.1 0.6 0 16 Phase 3 - 300K sf Island Parcel 16 0.1 0.5 0 16 Phase 4 - 100K sf E. of Tantau 15 0.06 0.3 0 16 Total 2,598 23 135.4 8 2,764 Phase 4 - 100K sf E. of Tantau3 19 0.16 0.6 0 19 Total 2,601 24 135.7 8 2,768 Percent Change (Phase 4)21%196%95%--23% Percent Change (Phases 1 through 4)0.12%0.46%0.22%0%0.13% Notes: 1 2 3 Abbreviations: DPM - diesel particulate matter lb - pound [Updated March, 2018]. On-road hauling and idling emissions for the Updated Phase 4 are calculated assuming years 2017 and 2018 in EMFAC2011. As the new proposed schedule spans Q2 2018 through Q3 2019, on-road emission factors will be lower over these years and the emissions presented here are therefore conservative. On-road idling emissions conservatively include the daily idling emissions from each truck, assuming each round trip is a new truck. Off-RoadConstruction Phase Hauling On-Road1,2 Concrete Delivery Trucks Idling3 Total Original DPM Emissions (lb) Updated Phase 4 For Updated Phase 4 emissions, on-road running emissions include 0.5 miles from each one-way haul trip. 3rd Trimester- 2 2+ Original1 Total DPM Off-Road & On-road Emissions (lb)2,558 206 2,764 Updated1 Total DPM Off-Road & On-road Emissions (lb)2,446 322 2,768 -4%56%0.13% 0.179 0.054 0.179 0.062 Original Emissions * IFinh 2.9E-03 7.1E-05 3.0E-03 Updated Emissions * IFinh 2.8E-03 1.1E-04 2.9E-03 -4%56%-3% 9.44 9.16 10.0 No Risk Calculation3: IFinh (Intake Factor, Inhalation) = DBR * EF * ED * CF * MAF * ASF / AT DBR = Daily Breathing Rate [L/kg-day] EF = Exposure Frequency [days/year] ED = Exposure Duration [years] CF = Conversion Factor [0.001 (m3/L)] MAF = Model Adjustment Factor [unitless] ASF = Age Sensitivity Factor [unitless] AT = Averaging Time [days] Notes: 1 2 3 4 5 Abbreviations: BAAQMD - Bay Area Air Quality Management District lb - pound m3 - cubic meter DPM - Diesel Particulate Matter L - liter mg - milligram MEI - Maximum Exposed Individual kg - kilogram The updated construction schedule's longer project length increased the 2+ year age bin exposure duration for the updated Ifinh. No other Ifinh input variables changed between the original and updated scenarios. Proposed Design Above Threshold? When allocating emissions to age bins, total emissions by phase (Demolition, Site Preparation, etc.) were assumed to be split evenly across the days within each proposed phase. Comparison of Original and Updated DPM Emissions and Resulting Risk Apple Campus 2 Phase 4 Updates Cupertino, CA Analysis Item Age Bins Total Table 5 The change from original to updated risk can be evaluated by looking at the change in [Emissions * IFinh] since dispersion factors would not change from the EIR analysis. The change in source allocation at the MEI due to the change in Phase 4 emissions is assumed to be insignificant as the overall change in DPM emissions is only 0.13%. Residential IF_inh (Original)2 Residential IF_inh (Updated)2,3,4 Change from Original to Updated Risk5 Original MEI (Cancer Risk in one million) Proposed MEI (Cancer Risk in one million) BAAQMD Threshold of Significance (Cancer Risk in one million) [Updated March, 2018] The updated IFinh reflects the previously proposed construction schedule with an end date in August, 2018. While the IFinh shown is lower than that for the new proposed schedule (Q2 2018 through Q3 2019), the increase is negated by a proportional decrease in the emission rate. This is because emissions will occur over a longer time period without any cumulative increase. Therefore, the change in Phase 4 construction schedule has no impact on the cancer risk at the Proposed MEI. Consistent with the maximally exposed individual evaluated in the EIR, exposure parameters assumed for this evaluation reflect a potential nearby child resident. Change from Original to Proposed Emissions (%) Table 6 Phase 4 Modeled Emission Rates Apple Campus 2 Phase 4 Updates Cupertino, CA [Updated June, 2018] Mass Emissions DPM TOG Demolition Structure & Site Demolition 8/1/2017 9/30/2017 8.3 63 lbs Grading Rough Grade Site 8/1/2017 10/30/2017 3.5 9.4 lbs Base Rock Work - St & Plot 10/1/2017 10/31/2017 1.5 4.2 lbs PCC Flatwork Cushion 10/1/2017 10/31/2017 1.6 4.2 lbs Asphalt Concrete Paving 7/1/2018 7/31/2018 1.3 3.4 lbs Other Concrete Pumping 1/1/2018 2/28/2018 1.5 4.2 lbs Steel Erection 4/1/2018 4/30/2018 0.75 2.4 lbs Exterior Skin 6/1/2018 8/31/2018 1.0 2.4 lbs Total Emissions 19 93 lbs Annual Emission Rate2 4.8E-04 --g/s Monthly Emission Rate August-17 4.93E-02 g/s September-17 4.93E-02 g/s October-17 1.66E-02 g/s November-17 0.00E+00 g/s December-17 0.00E+00 g/s January-18 3.10E-03 g/s February-18 3.10E-03 g/s March-18 0.00E+00 g/s April-18 3.66E-03 g/s May-18 0.00E+00 g/s June-18 1.15E-03 g/s July-18 6.06E-03 g/s August-18 1.15E-03 g/s Maximum Monthly Emission Rate3 4.93E-02 g/s Units Paving Building Construction Phase Type Phase Detail Start Date1 End Date1 Table 6 Phase 4 Modeled Emission Rates Apple Campus 2 Phase 4 Updates Cupertino, CA [Updated June, 2018] Notes: 1. 2. 3. Abbreviations: DPM - Diesel Particulate Matter g/s - grams per second lbs - pounds TOG - total organic gases The acute TOG emission rate was determined assuming 4 hours per day over the span of a given subphase. The maximum emission rate was modeled to determine estimated acute impacts. Since the proposed schedule updates in March 2018 would extend the overall Phase 4 construction period with no change in equipment and vehicle use, these maximum monthly emissions rates likely represent a conservative estimate. Start and end dates reflect equipment usage dates during each respective phase and may not directly correspond to the overall Phase 4 schedule. This either has no impact on chronic results or is a conservative estimate for acute results, as discussed in footnotes 2 and 3 below. The annual DPM emission rate was determined assuming 13 hours per day over the span of Phase 4, consistent with the original EIR. Note that this analysis does not reflect the schedule updates introduced in March, 2018. The emissions will occur over a longer time period than is shown above without any cumulative increase. Therefore, any increase in exposure period with the new proposed Phase 4 schedule would be offset by a decrease in average emission rate and would have no impact on estimated cancer risk. Table 7 Exposure Parameters1 Apple Campus 2 Phase 4 Updates Cupertino, CA [Updated June, 2018] Value Units Daily Breathing Rate DBR 581 [L/kg-day] Exposure Frequency EF 350 [days/year] Exposure Duration2 ED 1.1 [years] Conversion Factor CF 0.0010 [m3/L] Age Sensitivity Factor ASF 10 [unitless] Model Adjustment Factor MAF 1 [unitless] Averaging Time AT 25,550 [years] Intake Factor, Inhalation IFInh 0.086 Risk Calculation3: IFinh (Intake Factor, Inhalation) = DBR * EF * ED * CF * MAF * ASF / AT DBR = Daily Breathing Rate [L/kg-day] EF = Exposure Frequency [days/year] ED = Exposure Duration [years] CF = Conversion Factor [0.001 (m3/L)] MAF = Model Adjustment Factor [unitless] ASF = Age Sensitivity Factor [unitless] AT = Averaging Time [days] Notes: 1. 2. Abbreviations: BAAQMD - Bay Area Air Quality Management District L/kg-day - liters per kilogram per day m3/L - cubic meters per liter NSR - new source review Sources: Parameter Consistent with the maximally exposed individual evaluated in the EIR, exposure parameters assumed for this evaluation reflect a potential nearby child resident. BAAQMD. 2010. Air Toxics NSR Program Health Risk Screening Analysis Guidelines. January. This exposure duration does not reflect the increase in Phase 4 project length introduced in March, 2018. While this schedule change would increase the IFinh, it would be equally offset by a decrease in the modeled emission rate. As such, updating the exposure duration would have no impact on the analysis. Table 8 Toxicity Values Apple Campus 2 Phase 4 Updates Cupertino, CA [Updated June, 2018] Chemical1 CAS Cancer Potency Factor (mg/kg-day)-1 Chronic REL (µg/m3)Acute REL (µg/m3) Diesel PM 9901 1.1 5 -- TOG2 9999 ----351 Notes: 1. 2. Abbreviations: -- not available or not applicable µg/m3 - micrograms per cubic meter ARB - Air Resources Board Cal/EPA - California Environmental Protection Agency (mg/kg-day)-1 - per milligram per kilogram-day OEHHA - Office of Environmental Health Hazard Assessment PM - particulate matter REL - reference exposure level TOG - total organic gas References: LSA. 2013. Apple Campus 2 Project Draft Environmental Impact Report (DEIR). June. Cal/EPA. 2015. OEHHA/ARB Consolidated Table of Approved Risk Assessment Health Values. May 13. Chemicals presented in this table reflect air toxic contaminants in the proposed fuel types that are expected from off-road equipment and on-road trips. TOG Acute REL is a composite value that incorporated TOG speciation data and the relevant RELs into a single value. This value is consistent with the orginal analysis, as presented in DEIR Table V.L-8. Table 9 Phase 4 MEI Risk Summary Apple Campus 2 Phase 4 Updates Cupertino, CA [Updated June, 2018] UTMx UTMy m m Cancer Risk R19307 588,176 4,132,047 2.8 in a million 10 in a million Chronic HI R19307 588,176 4,132,047 0.0059 1.0 Acute HI R18761 588,172 4,131,990 0.14 1.0 Abbreviations BAAQMD - Bay Area Air Quality Management District CEQA - California Environmental Quality Act HI - Hazard Index m - meters MEI - Maximally Exposed Individual UTM - Universal Transverse Mercator Sources: BAAQMD. 2017. California Environmental Quality Act Air Quality Guidelines. May. ReceptorDescription Value BAAQMD CEQA Threshold Ramboll Environ FIGURES Figure 1 Original and Updated Construction Schedule Apple Campus II Phase 4 Updates Cupertino, CA [Updated March, 2018] J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D Phase 1 Main Campus X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Phase 2 200K sf E. of Tantau X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Phase 3 300K sf Island Parcel X X X X X X X X X X X X X X X Phase 4 100K sf E. of Tantau X X X X X X X X X X X X Key: X Original Schedule Updated Schedule Notes: 1. The Original Schedule reflects the construction schedule as evaluated in the Apple Campus II EIR. 2. The Updated Schedule reflects the actual scheduled followed for Phases 1-3 and the planned schedule for the updated Phase 4 design and construction. 2013 2014 2015 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 2016 2017 2018 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 2019 Q1 Q2 Q3 Q4 U:\Apple\2017 Updates\GIS\Fig 2 Ph4 Construction Model.mxdDRAFTED BY:DATE: 6/19/2018 Service Layer Credits: Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community PROJECT: FIGURE2CONSTRUCTION MODEL SETUP APPLE CAMPUS 2 CUPERTINO, CA Legend Phase 4 Construction Receptors North Tantau Ave - Site B Site & Architectural Review February 2018 Apple Campus 2 - Phase 2 Apple proposes to develop Site B of Phase 2 of Apple Campus 2. The site is delimited by Tantau Avenue to the West, Pruneridge Avenue to the North and Calabaza’s Creek to the South. When finished the building will anchor the corner of Tantau and Pruneridge and complement both Visitor Center and Tantau Visitor Gate buildings completing Apple Park’s East gateway. The project replaces the current disjointed assemblage of aging corporate faclities with a high performance state- of-the-art office facility. The building is located in a unified and partially secured landscape, which extends and connects the interior workplaces to outdoor faclities for relaxation, recreation and reflection. The 84,000 square feet two story building will have capacity to house up to 500 working spaces. The subterranean parking structure, which will hold close to 600 vehicles on three levels, will meet the building and compliment phase 2 development parking needs. This new development will continue to provide an environment reflecting Apple's brand values of innovation, ease of use and beauty. Among the project goals is to promote shared creativity and collaboration; to spur and encourage invention of the next several generations of Apple products. Project Description Site B - Tantau 14 Office Building Project Team APPLE INC. 1 Infiniite Loop MS 47-2 REF Cupertino, CA 95014 PHONE:408 996 1010 CONTACT:Dan Whisenhunt EMAIL:dwhisenhunt@apple.com FOSTER + PARTNERS 1000 Sansome Street Suite 240 San Francisco, CA 94111 PHONE:408 610 5800 CONTACT:Peter Sokoloff EMAIL: psokoloff@fosterandpartners.com OLIN STUDIO 150 South Independence Mall West Philadelphia, PA 19106 PHONE:215 440 0030 CONTACT:Sarah Williams EMAIL:swilliams@theolinstudio.com LUK & ASSOCIATES 738 Alfred Nobel Drive Hercules, CA 94547 PHONE:510 724 3388 CONTACT:Manish Dalia EMAIl:manish@lukassociates.com Project Objectives • Site B of Apple Park Phase 2 will result in replacement and rebuilding of the entire approximately 4.33 acre site with office space. The main objective of the project is to redevelop the site with a new, secure and private Apple building in close proximity to Phase 1 of Apple Park. The project's specific objectives are to: • Create an innovative and beautiful building adjacent to Apple Park that consolidates up to 500 of Apple's employees in distinctive office space with supporting facilities. The purpose of consolidation is to promote shared creativity and colaboration, and spur invention of the next several generations of Apple products. • Achieve the security and privacy required for the invention of new products by eliminating public access through the site East of Tantau Avenue and south of Pruneridge Avenue. • Maximize the provision of green space, and design this space in acoordance with the climate and history of the area. • Create a building that incorporate flexibility to respond to Apple's future business needs. • Achieve a net zero energy development by constructing energy efficient buildings, generating a significant amount of the Campus energy from on-site renewable sources, and developing partnership with renewable energy providers or grid-purchased renewable energy. • Minimize use of potable water through using recycled water, if available as a result of projects now under considertion, and improve runoff by increasing permeable surfaces. • Enable a commuting culture where throughtful site planning and regional connectivity coupled with a robust TDM program prioritize transit and active ammute modes. • Exceed economic, social and environmental sustainability goals through integrated design and development. • Create a campus that reflects Apple's business and design practices, and allows for a long-term presence in Cupertino. Permits and Approvals Associated with this Application Apple is seeking from the City of Cupertino the approval listed below: • Architectural and Site Approval • Minor Modifications to the October 2013 and February 2016 Development Permit. General Overview P-TA14-1.00 Cover Sheet P-TA14-1.10 List of Drawings / Project Overview P-TA14-1.20 Project Data Table / Project Location P-TA14-1.21 Development Area Analysis P-TA14-1.22 Amenity Area - Level 01, Level 02, Roof P-TA14-1.30 Proposed Conceptual Site Plan P-TA14-1.40 Existing Site Plan P-TA14-1.50 LEED Summary Site - Masterplan P-TA14-2.20 Site Plan - Site B Proposed P-TA14-2.21 Site Plan - Site B Proposed - Fire Access & Accessibility P-TA14-2.30 Site Sections P-TA14-2.40 Perspective View - Pruneridge Avenue Looking West P-TA14-2.41 Perspective View - Pruneridge Avenue Looking East Site - Civil P-TA14-3.00 Existing Topography P-TA14-3.10 Proposed Grading Plan P-TA14-3.30 Proposed Storm Water Control P-TA14-3.31 Stormwater Quality BMP - Typical Details P-TA14-3.40 Existing Utilities Plan P-TA14-3.50 Proposed Utilities Plan Site - Landscape P-TA14-4.00 Existing Tree Plan P-TA14-4.10 Proposed Tree Disposition Plan P-TA14-4.15 Tree Disposition Plan - North -Apple Park Overall Project P-TA14-4.16 Tree Disposition Plan - South -Apple Park Overall Project P-TA14-4.20 Landscape Plan P-TA14-4.21 Landscape Plan Rendering P-TA14-4.30 Landscape Plan - Trees - Site B P-TA14-4.31 Planting Plan - Herbaceous P-TA14-4.32 Planting Plan - Trees - Site C+D P-TA14-4.33 Planting Palette P-TA14-4.34 Planting Schedule P-TA14-4.40 Materials Plan P-TA14-4.41 Landscape Materials References P-TA14-4.50 Site Lighting Diagram P-TA14-4.60 Site Furnishings References P-TA14-4.70 Site Wall Diagram P-TA14-4.80 Site Sections Architecture - Tantau 14 P-TA14-5.00 Plan View Level B3 P-TA14-5.01 Plan View Level B2 P-TA14-5.02 Plan View Level B1 P-TA14-5.03 Plan View Level 01 P-TA14-5.04 Plan View Level 02 & Roof Level P-TA14-5.10 Sections P-TA14-5.20 Elevations - East, West, North & South P-TA14-5.30 North Facade - Rendered Elevation & External Materials List of Drawings OWNER ARCHITECT LANDSCAPE ARCHITECT CIVIL N. Tantau AvenuePruneridge Avenue © Foster + Partners 2017 N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. General Notes 1. 2. 3. 4. 5. 6. Do not scale drawings. Dimensions govern. All dimensions are in feet and inches unless noted otherwise. All levels are in feet and inches unless noted otherwise. All dimensions shall be verified on site before proceeding with the work. Foster + Partners shall be notified in writing of any discrepancies. Any areas indicated on this sheet are approximate and indicative only. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street 00 Apple Inc. Tantau 14 Building Apple Park Phase 2 01/31/2018 NTS P-TA14-1.10 2193 PLANNING APPLICATION List of Drawings Project Overview 00 01/31/2018 Planning - Site & Architectural Review F+P 3535BIKELANEBIKELANEBIKELANEBIKELANE35353535STOPSTOPSTOPSTOPSTOP 25 35PHASE 1 - MAIN SITETRANSIT CENTER ENTRANCE PHASE 1 - MAIN SITE TRANSIT CENTER EXIT PHASE 1 - MAIN SITE LOADING DOCK PHASE 1 - MAIN SITE TANTAU DRIVEWAY PHASE 2 - TANAUOFFICE BUILDING PHASE 2 - TANAUR&D BUILDING AND PARKING STRUCTURE PHASE 2 - TANTAUMARCOMM BUILDING EXISTINGPANASONIC DRIVEWAY EXISTINGPANASONICDRIVEWAY FORGE DRIVE EXISTINGKAISER DRIVEWAY KAISERDRIVEWAY SCVWD ACCESS SCVWD ACCESS ONLYONLYONLYONLY ONLYONLY ONLYONLY ONLY ONLY ONLYONLY ONLY ONLY ONLYONLY ONLYONLYONLYONLYONLYONLYONLYONLYONLYONL YONL YONL Y PHASE 1 - MAIN SITE WOLFE DRIVEWAY PHASE 1 - MAIN SITEFITNESS CENTER DRIVEWAY 30 feet '60.00 '110.95'288.55'100.00'60.00'156.01 '125.00'60.00'220.00'60.00'25.05 '160.00'175.20'183.75'60.00'60.00'60.00'40.00'215.68'332.43 '60.00 '66.51 '60.00'60.00 '294.66'150.00 '150.00 '150.00 '150''155.00'156.01 ONL YONL YONLYUTCFUELCELLYARD 11,750sq-ft ONLY36'-6" 4'- 1/16 " 6'-0" 4'-9 1/8 " 417'-5 13/16 " 6'-7 5/8 " 9'-2" 50'-2 1/16 " 9'- 9/16 " 50'-2 1/16 " 9'- 9/16 " 50'-2 1/16 " 13'-10 11/16 " 8'-5 15/16 " 14'-3 9/16 " 28'-7" 4'-0" 3" 16'-1" 8'-0" 9 1/16 " 8'-3" 7'-6" 4'-8" 9'-5" 4'-8" 9'-5" 5'-6" 9'-5" 4'-8" 9'-5" 4'-8" 9'-5" 4'-8" 9'-5" 4'-8" 9'-5" 7'-6" 7'-6" 6'-7" 5'-10" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 5' 5' 3' 5'-10" 3' 5'-10" 3' 4' 4' 4' 4' 29'-2" 29'-2" 29'-2" 29'-2" 5' 5' 5' 5' 5' 8' 17'-1" 4'-1"1'-1" 8' 4'-8" 29'-2" 29'-2" 29'-2" 29'-2" 4' 4' 4' 4' 4' 5' 5' 5'-10" 6'-7" 3' 3'-10" 6'-7" 6'-3" 6'-3" 6'-3" 6'-3" 6'-7" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 0" 6'-3" 6'-3" 6'-3" 5'-10" 3' 5'-10" 5' 4'-3"4'-3" 8' 8'-6" 8' 4'-3"4'-3" 10' 9'-6" 8'-6" 8' 8'-6" 8' 4'-3"4'-3" 5' 9' 4'-8" 4'-9" 9' 5' 4'-3"4'-3" 8' 8'-6" 8' 8'-6" 9'-6" 8' 8'-6" 8' 8'-6" 8' 4'-3"4'-3"4'-11" 9'-5" 4'-8" 9'-5" 4'-8" 8'-2" 3' 4'-1" 10'-5" 10'-5" 4'-5" 4'-5" 4'-3" 6'-7" 7' 2'-2"3'-1" 4'1' 3'3' 4' 29'-2" 4' 4' 4' 4' 4' 4' 8' 17'-1" 4'-1" 1'-1" 8'4'-8" 4' 4' 4' 4' 4' 29'-2" 4'-1" 3' 8' 8' 6'-3" 6'-3" 3' 7' 2'-2" 4' 4'1' 3'-1" 3' 3' 3' APP0 04.25APP004.11 APP004.24APP004.23 APP0 04.22APP004.21 APP0 04.14 APP0 04.12 APP004.13 APP004.15 APP004.35APP004.41APP004.34APP004.33APP004.32APP004.31APP004.44APP004.42APP004.43APP004.45BACKUP DIESEL GENERATOR BACKUP DIESEL GENERATOR BACKUP DIESEL GENERATOR (FUTURE) ABOVE GROUND DIESEL STORAGE TANKABOVE GROUND DIESEL STORAGE TANK C OO LIN G TOW ERYARD8,315sq-ftC OO LIN G TOW ERYARD8,315sq-ftXX X X X X X X X X X X X X X X X X X HC HC HC HC HC HCHC 6 1/2 "1"1'-0"6"1"6 1/2 "upup+176'-06''+155'-7 1/2"+141'-6''+141'-6''+155'-7 1/2"+156'-7 1/2"A OM4.21 AOM4 .22 AOM4.23 AOM4 .24 AOM 4.25AOM4.11 AOM4 .12 AOM4.13 AOM4 .14 AOM 4.15 WDM 14/15 WDM 12/13 WDM 11/21 EDM2EDM1 TELE1TELE2 TELEC WDM 22/23 WDM 24/25 AOM4.31AOM4.32AOM4.33AOM4.34AOM4.35AOM4.41AOM4.42AOM4.43AOM4.44AOM4.45WDM44/45WDM42/43WDM31/41WDM 32/33 WDM34/35 EDM4 EDM3 TELE3 TELE4 LIMB UP LIMB UP CompactorsBalerChillersLogisticsStorageCooling TowersEmergencyGeneratorsLoadBankSwitchgearGasMeterTransformersGREASEINTERCEPTORD DDDPHASE 1 - MAIN SITETRANSIT CENTER ENTRANCE PHASE 1 - MAIN SITE TRANSIT CENTER EXIT PHASE 1 - MAIN SITE LOADING DOCK PHASE 1 - MAIN SITE TANTAU DRIVEWAY PHASE 2 - TANAUOFFICE BUILDING PHASE 2 - TANAUR&D BUILDING AND PARKING STRUCTURE PHASE 2 - TANTAUMARCOMM BUILDING EXISTINGPANASONIC DRIVEWAY EXISTINGPANASONICDRIVEWAY FORGE DRIVE EXISTINGKAISER DRIVEWAY KAISERDRIVEWAY SCVWD ACCESS SCVWD ACCESS ONLYONLYONLYONLY ONLYONLY ONLYONLY ONLY ONLY ONLYONLY ONLY ONLY ONLYONLY ONLYONLYONLYONLYONLYONLYONLYONLYONLYONL YONL YONL Y PHASE 1 - MAIN SITE WOLFE DRIVEWAY PHASE 1 - MAIN SITEFITNESS CENTER DRIVEWAY 30 feet '60.00 '110.95'288.55'100.00'60.00'156.01 '125.00'60.00'220.00'60.00'25.05 '160.00'175.20'183.75'60.00'60.00'60.00'40.00'215.68'332.43 '60.00 '66.51 '60.00'60.00 '294.66'150.00 '150.00 '150.00 '150''155.00'156.01 ONL YONL YONLYDN DN PCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPC PC PCPCPCPCPCPCPCPCPCPC PC PC PC PC PCPC PC PC PC PCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPC PC PC PC PCPCPCPCPC PC PC PC PC PC PC PC PC PC PC PC PC PCPC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PCPCONL YONL Y F . D . PLANTING NO TES:1.ALL AREAS NO T CO VERED BY BUILDING S O R PAVEM ENTAND WHICH HAVE BEEN G RADED O R O THERWISEDISTURBED SHALL BE TO PSO ILED AND SEEDED,UNLESS SHO WN O THERWISE.2.ALL TREES O UTSIDE THE BUILDING AND PAVED AREASSHALL REM AIN AND BE PRO TECTED DURINGCO NSTRUCTIO N, UNLESS SPECIFICALLY DESIG NATEDTO BE REM O VED. PRIO R TO REM O VAL, THECO NTRACTO R SHALL ARRANG E AN ON-SITE M EETINGWITH THE LANDSCAPE ARCHITECT TO REVIEW THECLEARING LIM IT LINES. VERIFY LO CATIONS O F ALLUTILITIES PRIO R TO EXCAVATIO N O R PLANT PITS.3.P.B. = PLANT BED. M ULCH ALL PLANT BEDS TO A DEPTHO F 2". BEDS SHALL BE KEPT 1" M IN AWAY FRO M TRUNKO F ALL TREES, SHRUBS, TREE FERNS, AND FO LIAG E O FALL PERENNIALS.4.THE CO NTRACTO R SHALL SUPPLY ALL PLANT M ATERIALIN Q UANTITIES SUFFICIENT TO CO MPLETE THEPLANTING SHO WN IN THE DRAWING S.5.CO NTRACTO R SHALL REM O VE ALL HARD LUM PS O FCLAY, STO NES O VER 1" IN DIAM ETER, AND ALLCO NSTRUCTIO N DEBRIS INCLUDING G RAVEL, RO O TS,LIM BS AND O THER DELETERIOUS M ATTER WHICHWO ULD BE HARM FUL, O R PREVENT PRO PERESTABLISHM ENT AND/O R M AINTENANCE O F LAWN ANDPLANTING AREAS.6.ALL TREES SHALL CO NFO RM TO G UIDELINESESTABLISHED BY “THE AM ERICAN STANDARD FO RNURSERY STO CK” PUBLISHED BY THE AM ERICANASSO CIATIO N O F NURSERYM EN (LATEST EDITIO N).7.NO TREES SHALL BE PLANTED BEFO RE ACCEPTANCEO F RO UGH G RADING . TREES SHALL BEAR SAM ERELATIO NSHIP TO FINISHED G RADE AS TO ORIG INALG RADE PRIO R TO DIG G ING .8.ALL PLANTS SHALL BE BALLED IN BURLAP O RCO NTAINER G ROWN UNLESS O THERWISE NO TED IN THEPLANTING SCHEDULE.9.ALL PLANTS SHALL BE APPRO VED BY THE LANDSCAPEARCHITECT PRIO R TO THEIR ARRIVAL O N THE SITE10.THE CO NTRACTO R SHALL LO CATE AND VERIFY UTILITYLINE LO CATIO NS PRIO R TO PLANTING AND REPO RT ANYCO NFLICTS TO THE LANDSCAPE ARCHITECT.11.THE LAYO UT O F PLANTS IN THE FIELD IS TO BEAPPRO VED BY THE LANDSCAPE ARCHITECT PRIO R TOPLANTING . PLANTING PLAN LEG ENDPRO PO SED TREEPRO PO SED SHRUBSEXISTING TREE℄PCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPC PC PCPCPCPCPCPCPCPCPCPC PC PC PC PC PCPC PC PC PC PCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPC PC PC PC PCPCPCPCPC PC PC PC PC PC PC PC PC PC PC PC PC PCPC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PCPCPLANTING NO TES:1.ALL AREAS NO T CO VERED BY BUILDING S O R PAVEM ENTAND WHICH HAVE BEEN G RADED O R O THERWISEDISTURBED SHALL BE TO PSO ILED AND SEEDED,UNLESS SHO WN O THERWISE.2.ALL TREES O UTSIDE THE BUILDING AND PAVED AREASSHALL REM AIN AND BE PRO TECTED DURINGCO NSTRUCTIO N, UNLESS SPECIFICALLY DESIG NATEDTO BE REM O VED. PRIO R TO REM O VAL, THECO NTRACTO R SHALL ARRANG E AN ON-SITE M EETINGWITH THE LANDSCAPE ARCHITECT TO REVIEW THECLEARING LIM IT LINES. VERIFY LO CATIONS O F ALLUTILITIES PRIO R TO EXCAVATIO N O R PLANT PITS.3.P.B. = PLANT BED. M ULCH ALL PLANT BEDS TO A DEPTHO F 2". BEDS SHALL BE KEPT 1" M IN AWAY FRO M TRUNKO F ALL TREES, SHRUBS, TREE FERNS, AND FO LIAG E O FALL PERENNIALS.4.THE CO NTRACTO R SHALL SUPPLY ALL PLANT M ATERIALIN Q UANTITIES SUFFICIENT TO CO MPLETE THEPLANTING SHO WN IN THE DRAWING S.5.CO NTRACTO R SHALL REM O VE ALL HARD LUM PS O FCLAY, STO NES O VER 1" IN DIAM ETER, AND ALLCO NSTRUCTIO N DEBRIS INCLUDING G RAVEL, RO O TS,LIM BS AND O THER DELETERIOUS M ATTER WHICHWO ULD BE HARM FUL, O R PREVENT PRO PERESTABLISHM ENT AND/O R M AINTENANCE O F LAWN ANDPLANTING AREAS.6.ALL TREES SHALL CO NFO RM TO G UIDELINESESTABLISHED BY “THE AM ERICAN STANDARD FO RNURSERY STO CK” PUBLISHED BY THE AM ERICANASSO CIATIO N O F NURSERYM EN (LATEST EDITIO N).7.NO TREES SHALL BE PLANTED BEFO RE ACCEPTANCEO F RO UGH G RADING . TREES SHALL BEAR SAM ERELATIO NSHIP TO FINISHED G RADE AS TO ORIG INALG RADE PRIO R TO DIG G ING .8.ALL PLANTS SHALL BE BALLED IN BURLAP O RCO NTAINER G ROWN UNLESS O THERWISE NO TED IN THEPLANTING SCHEDULE.9.ALL PLANTS SHALL BE APPRO VED BY THE LANDSCAPEARCHITECT PRIO R TO THEIR ARRIVAL O N THE SITE10.THE CO NTRACTO R SHALL LO CATE AND VERIFY UTILITYLINE LO CATIO NS PRIO R TO PLANTING AND REPO RT ANYCO NFLICTS TO THE LANDSCAPE ARCHITECT.11.THE LAYO UT O F PLANTS IN THE FIELD IS TO BEAPPRO VED BY THE LANDSCAPE ARCHITECT PRIO R TOPLANTING . PLANTING PLAN LEG ENDPRO PO SED TREEPRO PO SED SHRUBSEXISTING TREE℄3535BIKELANEBI KELANEBIKELANEBIKELANE35353535STOPSTOPSTOPSTOPSTOP 25 35PHASE 1 - MAIN SITETRANSIT CENTER ENTRANCE PHASE 1 - MAIN SITE TRANSIT CENTER EXIT PHASE 1 - MAIN SITE LOADING DOCK PHASE 1 - MAIN SITE TANTAU DRIVEWAY PHASE 2 - TANAUOFFICE BUILDING PHASE 2 - TANAUR&D BUILDING AND PARKING STRUCTURE PHASE 2 - TANTAUMARCOMM BUILDING EXISTINGPANASONIC DRIVEWAY EXISTINGPANASONICDRIVEWAY FORGE DRIVE EXISTINGKAISER DRIVEWAY KAISERDRIVEWAY SCVWD ACCESS SCVWD ACCESS ONLYONLYONLYONLY ONLYONLY ONLYONLY ONLY ONLY ONLYONLY ONLY ONLY ONLYONLY ONLYONLYONLYONLYONLYONLYONLYONLYONLYONL YONL YONL Y PHASE 1 - MAIN SITE WOLFE DRIVEWAY PHASE 1 - MAIN SITEFITNESS CENTER DRIVEWAY 30 feet '60.00 '110.95'288.55'100.00'60.00'156.01 '125.00'60.00'220.00'60.00'25.05 '160.00'175.20'183.75'60.00'60.00'60.00'40.00'215.68'332.43 '60.00 '66.51 '60.00'60.00 '294.66'150.00 '150.00 '150.00 '150''155.00'156.01 ONL YONL YONLYUTCFUELCELLYARD 11,750sq-ft ONLY36'-6" 4'- 1/16 " 6'-0" 4'-9 1/8 " 417'-5 13/16 " 6'-7 5/8 " 9'-2" 50'-2 1/16 " 9'- 9/16 " 50'-2 1/16 " 9'- 9/16 " 50'-2 1/16 " 13'-10 11/16 " 8'-5 15/16 " 14'-3 9/16 " 28'-7" 4'-0" 3" 16'-1" 8'-0" 9 1/16 " 8'-3" 7'-6" 4'-8" 9'-5" 4'-8" 9'-5" 5'-6" 9'-5" 4'-8" 9'-5" 4'-8" 9'-5" 4'-8" 9'-5" 4'-8" 9'-5" 7'-6" 7'-6" 6'-7" 5'-10" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 5' 5' 3' 5'-10" 3' 5'-10" 3' 4' 4' 4' 4' 29'-2" 29'-2" 29'-2" 29'-2" 5' 5' 5' 5' 5' 8' 17'-1" 4'-1"1'-1" 8' 4'-8" 29'-2" 29'-2" 29'-2" 29'-2" 4' 4' 4' 4' 4' 5' 5' 5'-10" 6'-7" 3' 3'-10" 6'-7" 6'-3" 6'-3" 6'-3" 6'-3" 6'-7" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 0" 6'-3" 6'-3" 6'-3" 5'-10" 3' 5'-10" 5' 4'-3"4'-3" 8' 8'-6" 8' 4'-3"4'-3" 10' 9'-6" 8'-6" 8' 8'-6" 8' 4'-3"4'-3" 5' 9' 4'-8" 4'-9" 9' 5' 4'-3"4'-3" 8' 8'-6" 8' 8'-6" 9'-6" 8' 8'-6" 8' 8'-6" 8' 4'-3"4'-3"4'-11" 9'-5" 4'-8" 9'-5" 4'-8" 8'-2" 3' 4'-1" 10'-5" 10'-5" 4'-5" 4'-5" 4'-3" 6'-7" 7' 2'-2"3'-1" 4'1' 3'3' 4' 29'-2" 4' 4' 4' 4' 4' 4' 8' 17'-1" 4'-1" 1'-1" 8'4'-8" 4' 4' 4' 4' 4' 29'-2" 4'-1" 3' 8' 8' 6'-3" 6'-3" 3' 7' 2'-2" 4' 4'1' 3'-1" 3' 3' 3' APP004.25 APP004.11 APP004.24APP004.23 APP004.22APP004.21 APP004.14 APP004.12 APP004.13 APP004.15 APP004.35APP004.41APP004.34APP004.33APP004.32APP004.31APP004.44APP004.42APP004.43APP004.45BACKUP DIESEL GENERATOR BACKUP DIESEL GENERATOR BACKUP DIESEL GENERATOR (FUTURE) ABOVE GROUND DIESEL STORAGE TANKABOVE GROUND DIESEL STORAGE TANK C OO LIN G TOW ERYARD8,315sq-ftC OO LIN G TOW ERYARD8,315sq-ftXX X X X X X X X X X X X X X X X X X HC HC HC HC HC HCHC 6 1/2 "1"1'-0"6"1"6 1/2 "upup+176'-06''+155'-7 1/2"+141'-6''+141'-6''+155'-7 1/2"+156'-7 1/2"AOM4.21 AOM4.22 AOM4.23 AOM 4.24 AOM 4.25 AOM4.11 AOM4.12 AOM4.13 AOM 4.14 AOM 4.15 WDM 14/15 WDM 12/13 WDM 11/21 EDM2EDM1 TELE1TELE2 TELEC WDM 22/23 WDM 24/25 AOM4.31AOM4.32AOM4.33AOM4.34AOM4.35AOM4.41AOM4.42AOM4.43AOM4.44AOM4.45WDM44/45WDM42/43WDM31/41WDM 32/33 WDM34/35 EDM4 EDM3 TELE3 TELE4 LIMB UP LIMB UP CompactorsBalerChillersLogisticsStorageCooling TowersEmergencyGeneratorsLoadBankSwitchgearGasMeterTransformersGREASEINTERCEPTORD DDDPHASE 1 - MAIN SITETRANSIT CENTER ENTRANCE PHASE 1 - MAIN SITE TRANSIT CENTER EXIT PHASE 1 - MAIN SITE LOADING DOCK PHASE 1 - MAIN SITE TANTAU DRIVEWAY PHASE 2 - TANAUOFFICE BUILDING PHASE 2 - TANAUR&D BUILDING AND PARKING STRUCTURE PHASE 2 - TANTAUMARCOMM BUILDING EXISTINGPANASONIC DRIVEWAY EXISTINGPANASONICDRIVEWAY FORGE DRIVE EXISTINGKAISER DRIVEWAY KAISERDRIVEWAY SCVWD ACCESS SCVWD ACCESS ONLYONLYONLYONLY ONLYONLY ONLYONLY ONLY ONLY ONLYONLY ONLY ONLY ONLYONLY ONLYONLYONLYONLYONLYONLYONLYONLYONLYONL YONL YONL Y PHASE 1 - MAIN SITE WOLFE DRIVEWAY PHASE 1 - MAIN SITEFITNESS CENTER DRIVEWAY 30 feet '60.00 '110.95'288.55'100.00'60.00'156.01 '125.00'60.00'220.00'60.00'25.05 '160.00'175.20'183.75'60.00'60.00'60.00'40.00'215.68'332.43 '60.00 '66.51 '60.00'60.00 '294.66'150.00 '150.00 '150.00 '150''155.00'156.01 ONL YONL YONLYDN DN PCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPC PC PCPCPCPCPCPCPCPCPCPC PC PC PC PC PCPC PC PC PC PCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPC PC PC PC PCPCPCPCPC PC PC PC PC PC PC PC PC PC PC PC PC PCPC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PCPCONL YONL Y F . D . PLANTING NO TES:1.ALL AREAS NO T CO VERED BY BUILDING S O R PAVEM ENTAND WHICH HAVE BEEN G RADED O R O THERWISEDISTURBED SHALL BE TO PSO ILED AND SEEDED,UNLESS SHO WN O THERWISE.2.ALL TREES O UTSIDE THE BUILDING AND PAVED AREASSHALL REM AIN AND BE PRO TECTED DURINGCO NSTRUCTIO N, UNLESS SPECIFICALLY DESIG NATEDTO BE REM O VED. PRIO R TO REM O VAL, THECO NTRACTO R SHALL ARRANG E AN ON-SITE M EETINGWITH THE LANDSCAPE ARCHITECT TO REVIEW THECLEARING LIM IT LINES. VERIFY LO CATIONS O F ALLUTILITIES PRIO R TO EXCAVATIO N O R PLANT PITS.3.P.B. = PLANT BED. M ULCH ALL PLANT BEDS TO A DEPTHO F 2". BEDS SHALL BE KEPT 1" M IN AWAY FRO M TRUNKO F ALL TREES, SHRUBS, TREE FERNS, AND FO LIAG E O FALL PERENNIALS.4.THE CO NTRACTO R SHALL SUPPLY ALL PLANT M ATERIALIN Q UANTITIES SUFFICIENT TO CO MPLETE THEPLANTING SHO WN IN THE DRAWING S.5.CO NTRACTO R SHALL REM O VE ALL HARD LUM PS O FCLAY, STO NES O VER 1" IN DIAM ETER, AND ALLCO NSTRUCTIO N DEBRIS INCLUDING G RAVEL, RO O TS,LIM BS AND O THER DELETERIOUS M ATTER WHICHWO ULD BE HARM FUL, O R PREVENT PRO PERESTABLISHM ENT AND/O R M AINTENANCE O F LAWN ANDPLANTING AREAS.6.ALL TREES SHALL CO NFO RM TO G UIDELINESESTABLISHED BY “THE AM ERICAN STANDARD FO RNURSERY STO CK” PUBLISHED BY THE AM ERICANASSO CIATIO N O F NURSERYM EN (LATEST EDITIO N).7.NO TREES SHALL BE PLANTED BEFO RE ACCEPTANCEO F RO UGH G RADING . TREES SHALL BEAR SAM ERELATIO NSHIP TO FINISHED G RADE AS TO ORIG INALG RADE PRIO R TO DIG G ING .8.ALL PLANTS SHALL BE BALLED IN BURLAP O RCO NTAINER G ROWN UNLESS O THERWISE NO TED IN THEPLANTING SCHEDULE.9.ALL PLANTS SHALL BE APPRO VED BY THE LANDSCAPEARCHITECT PRIO R TO THEIR ARRIVAL O N THE SITE10.THE CO NTRACTO R SHALL LO CATE AND VERIFY UTILITYLINE LO CATIO NS PRIO R TO PLANTING AND REPO RT ANYCO NFLICTS TO THE LANDSCAPE ARCHITECT.11.THE LAYO UT O F PLANTS IN THE FIELD IS TO BEAPPRO VED BY THE LANDSCAPE ARCHITECT PRIO R TOPLANTING . PLANTING PLAN LEG ENDPRO PO SED TREEPRO PO SED SHRUBSEXISTING TREE℄PCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPC PC PCPCPCPCPCPCPCPCPCPC PC PC PC PC PCPC PC PC PC PCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPC PC PC PC PCPCPCPCPC PC PC PC PC PC PC PC PC PC PC PC PC PCPC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PCPCPLANTING NO TES:1.ALL AREAS NO T CO VERED BY BUILDING S O R PAVEM ENTAND WHICH HAVE BEEN G RADED O R O THERWISEDISTURBED SHALL BE TO PSO ILED AND SEEDED,UNLESS SHO WN O THERWISE.2.ALL TREES O UTSIDE THE BUILDING AND PAVED AREASSHALL REM AIN AND BE PRO TECTED DURINGCO NSTRUCTIO N, UNLESS SPECIFICALLY DESIG NATEDTO BE REM O VED. PRIO R TO REM O VAL, THECO NTRACTO R SHALL ARRANG E AN ON-SITE M EETINGWITH THE LANDSCAPE ARCHITECT TO REVIEW THECLEARING LIM IT LINES. VERIFY LO CATIONS O F ALLUTILITIES PRIO R TO EXCAVATIO N O R PLANT PITS.3.P.B. = PLANT BED. M ULCH ALL PLANT BEDS TO A DEPTHO F 2". BEDS SHALL BE KEPT 1" M IN AWAY FRO M TRUNKO F ALL TREES, SHRUBS, TREE FERNS, AND FO LIAG E O FALL PERENNIALS.4.THE CO NTRACTO R SHALL SUPPLY ALL PLANT M ATERIALIN Q UANTITIES SUFFICIENT TO CO MPLETE THEPLANTING SHO WN IN THE DRAWING S.5.CO NTRACTO R SHALL REM O VE ALL HARD LUM PS O FCLAY, STO NES O VER 1" IN DIAM ETER, AND ALLCO NSTRUCTIO N DEBRIS INCLUDING G RAVEL, RO O TS,LIM BS AND O THER DELETERIOUS M ATTER WHICHWO ULD BE HARM FUL, O R PREVENT PRO PERESTABLISHM ENT AND/O R M AINTENANCE O F LAWN ANDPLANTING AREAS.6.ALL TREES SHALL CO NFO RM TO G UIDELINESESTABLISHED BY “THE AM ERICAN STANDARD FO RNURSERY STO CK” PUBLISHED BY THE AM ERICANASSO CIATIO N O F NURSERYM EN (LATEST EDITIO N).7.NO TREES SHALL BE PLANTED BEFO RE ACCEPTANCEO F RO UGH G RADING . TREES SHALL BEAR SAM ERELATIO NSHIP TO FINISHED G RADE AS TO ORIG INALG RADE PRIO R TO DIG G ING .8.ALL PLANTS SHALL BE BALLED IN BURLAP O RCO NTAINER G ROWN UNLESS O THERWISE NO TED IN THEPLANTING SCHEDULE.9.ALL PLANTS SHALL BE APPRO VED BY THE LANDSCAPEARCHITECT PRIO R TO THEIR ARRIVAL O N THE SITE10.THE CO NTRACTO R SHALL LO CATE AND VERIFY UTILITYLINE LO CATIO NS PRIO R TO PLANTING AND REPO RT ANYCO NFLICTS TO THE LANDSCAPE ARCHITECT.11.THE LAYO UT O F PLANTS IN THE FIELD IS TO BEAPPRO VED BY THE LANDSCAPE ARCHITECT PRIO R TOPLANTING . PLANTING PLAN LEG ENDPRO PO SED TREEPRO PO SED SHRUBSEXISTING TREE℄ P2 P3 XXXXXXMATCHLINEXXXXXXMATCHLINEXBASELINE X11101101 1 101 1 101 1 101 1 101 XBASELINE X11101101 1 101 1 101 1 101 1 101 P2 P3 XXXXXXMATCHLINEXXXXXXMATCHLINEXBASELINE X11101101 1 101 1 101 1 101 1 101 XBASELINE X11101101 1 101 1 101 1 101 1 101 P2 P3 XXXXXXMATCHLINEXXXXXXMATCHLINEXBASELINE X11101101 1 101 1 101 1 101 1 101 XBASELINE X11101101 1 101 1 101 1 101 1 101 SITE B 500 EMPLOYEES 600 PARKING SPACES PHASE 2 1,900 EMPLOYEES 1,740 PARKING SPACES SITE C + D 1,400 EMPLOYEES 1,140 PARKING SPACES NOT PART OF THIS SUBMITTAL REFERENCE DIR-2016-12 SITE C SITE D IN T E R S T A T E - 280 PRUNERIDGE AVE. E. HOMESTEAD ROAD N. WOLFE ROADN. TANTAU AVE.N. TANTAU AVE.N. WOLFE ROADC A L A B A Z A S C R E E K N. Tantau AvenuePruneridge Avenue © Foster + Partners 2017 N N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. General Notes 1. 2. 3. 4. 5. 6. Do not scale drawings. Dimensions govern. All dimensions are in feet and inches unless noted otherwise. All levels are in feet and inches unless noted otherwise. All dimensions shall be verified on site before proceeding with the work. Foster + Partners shall be notified in writing of any discrepancies. Any areas indicated on this sheet are approximate and indicative only. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street 1" = 200'-0" 00 Apple Inc. Tantau 14 Building Apple Park Phase 2 01/31/2018 P-TA14-1.20 2193 PLANNING APPLICATION Project Data Table Project Location 1" = 200'-0"01 Project Location 00 01/31/2018 Planning - Site & Architectural Review F+P N. Tantau AvenuePruneridge Avenue© Foster + Partners 2017NNClientProjectTitleProject No. DateScale at Arch E1NumberKey Plan.General Notes1.2.3.4.5.6.Do not scale drawings. Dimensions govern.All dimensions are in feet and inches unless noted otherwise.All levels are in feet and inches unless noted otherwise.All dimensions shall be verified on site before proceeding with the work.Foster + Partners shall be notified in writing of any discrepancies.Any areas indicated on this sheet are approximate and indicative only.Rev.DateReason For IssueChkRevisionSuite 240San Francisco, CA 94111www.fosterandpartners.comT 408 610 5800OLINLuk and AssociatesPhiladephia, PA 19106T 215 440 0030 / Fax 215 440 0041OLIN Partnership. Ltdwww.theolinstudion.com738 Alfred Nobel DriveHercules, CA 94547www.lukassociates.comT 510 724 3388150 South Independence Mall WestPublic Ledger Building, Suite 1123LANDSCAPE ARCHITECTURE AND URBAN DESIGN1000 Samsome Street00Apple Inc.Tantau 14 BuildingApple ParkPhase 201/31/2018 NTSP-TA14-1.212193PLANNING APPLICATIONDevelopment Area Analysis00 01/31/2018 Planning - Site & Architectural Review F+P 469 SFDNDNDNLevel 02 - Amenity Area PlanCAFE / COFFEE -469 SFPENTHOUSE - NOT SIGNIFICANTLY ENCLOSED - N/AUNOCCUPIED MECHANICAL - N/A400 SFRoof Level - Amenity Area PlanMECHANICAL PENTHOUSE - 400 SF3%3%10%10%10%10%1%1%1%AHU PADAHU PADAHU PADAHU PADAIR CHILLER PADEQUIPMENT PADAMENITY SPACE -14,992 SF8,402 SF6,590 SFLevel 01 - Amenity Area PlanN. Tantau AvenuePruneridge Avenue© Foster + Partners 2017NNClientProjectTitleProject No. DateScale at Arch E1NumberKey Plan.General Notes1.2.3.4.5.6.Do not scale drawings. Dimensions govern.All dimensions are in feet and inches unless noted otherwise.All levels are in feet and inches unless noted otherwise.All dimensions shall be verified on site before proceeding with the work.Foster + Partners shall be notified in writing of any discrepancies.Any areas indicated on this sheet are approximate and indicative only.Rev.DateReason For IssueChkRevisionSuite 240San Francisco, CA 94111www.fosterandpartners.comT 408 610 5800OLINLuk and AssociatesPhiladephia, PA 19106T 215 440 0030 / Fax 215 440 0041OLIN Partnership. Ltdwww.theolinstudion.com738 Alfred Nobel DriveHercules, CA 94547www.lukassociates.comT 510 724 3388150 South Independence Mall WestPublic Ledger Building, Suite 1123LANDSCAPE ARCHITECTURE AND URBAN DESIGN1000 Samsome Street 1" = 20'-0"00Apple Inc.Tantau 14 BuildingApple ParkPhase 201/31/2018P-TA14-1.222193PLANNING APPLICATIONAmenity AreaLevel 01, Level 02, Roof00 01/31/2018 Planning - Site & Architectural Review F+P PRUNERIDGE AVENUEN. TANTAU AVENUEN. TANTAU AVENUEC A L A B A Z A S C R E E K N. Tantau AvenuePruneridge Avenue © Foster + Partners 2017 N N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. General Notes 1. 2. 3. 4. 5. 6. Do not scale drawings. Dimensions govern. All dimensions are in feet and inches unless noted otherwise. All levels are in feet and inches unless noted otherwise. All dimensions shall be verified on site before proceeding with the work. Foster + Partners shall be notified in writing of any discrepancies. Any areas indicated on this sheet are approximate and indicative only. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street 00 Apple Inc. Tantau 14 Building Apple Park Phase 2 01/31/2018 NTS P-TA14-1.30 2193 PLANNING APPLICATION Proposed Conceptual Site Plan Tantau 14 Building 2 story Visitor Center 1 story w/ Terrace (Not Part of this Submittal) R&D Building 2 story (Not Part of this Submittal) 01 Site Plan Reception Building 1 story (Not Part of this Submittal) Tantau 14 Parking Structure 3 story (Below Grade) Tantau 14 Building Green Roof (Level 01) 00 01/31/2018 Planning - Site & Architectural Review F+P Existing Site Plan 01 1" = 40'-0" P-TA14-1.40 Existing Site Plan CALABAZAS CREEK (0333 O.R. 739) 10.00' PG&E EASEMENT-STRIP 1 119.35'84.21'328.75' 64.34' (0333 O.R. 739) 10.00' PG&E EASEMENT ONLYONLYONLY ONLY ONLYONLYONLY ONLYONLYONLY RSVEV ONLYONLY North Tantau AvenueNorth Tantau AvenueNorth Tantau AvenuePruneridge Avenue 64,680 square feet 10590 - 10596 N. Tantau Ave Tantau 3 23,595 square feet 10600 N. Tantau Ave Tantau 4 21,580 square feet10670 N. Tantau AveTantau 5Calabazas Creek Calabazas Creek Notes 1. 2. 1" = 40'-0"2193 N Title Project No. Date Scale at Arch E1 Number Revision Topographic survey information on these plans has been obtained November 15th, 2012 from Kier & Wright surveyors, dated November 15,2012, and subsequent field survey. Property Line information on these plans has been obtained from Kier & Wright surveyors, recorded December, 2014 - Parcel Map. Apple Inc. Phase 2 Apple Park Tantau 14 Building PLANNING APPLICATION 00 01/31/2018 F+PPlanning - Site & Architectural Review 00 01/31/2018 © Foster + Partners 2017 N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street N. Tantau AvenuePruneridge Avenue N. Tantau AvenuePruneridge Avenue © Foster + Partners 2017 N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. General Notes 1. 2. 3. 4. 5. 6. Do not scale drawings. Dimensions govern. All dimensions are in feet and inches unless noted otherwise. All levels are in feet and inches unless noted otherwise. All dimensions shall be verified on site before proceeding with the work. Foster + Partners shall be notified in writing of any discrepancies. Any areas indicated on this sheet are approximate and indicative only. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street 00 Apple Inc. Tantau 14 Building Apple Park Phase 2 01/31/2018 NTS P-TA14-1.50 2193 PLANNING APPLICATION LEED Summary 01 Tantau 14 LEED Score Card LEED Scorecard - Certification Level Summary Brightworks is coordinating the sustainability strategies implementation and LEED certification for Apple Campus 2, Phase 2 Tantau 14 project. The following summary represents a snapshot of where the project stands with respects to LEED certification (Certified, Silver, Gold, Platinum). This project is expected to achieve LEED gold. LEED silver is a minimum requirement of the City of Cupertino. The charts provided summarize the credits that should be achievable for this project. The 'Yes' credits have been identified through the current design and team meetings, while the 'Mayve' credits (Probable Yes/No) are held back due to design development uncertainty. However, it is certain at this time that the Tantau 14 project will achieve LEED Silver certification at a minimum. 00 01/31/2018 Planning - Site & Architectural Review F+P Site - Masterplan PHASE 1 - MAIN SITE TANTAU DRIVEWAY SCVWD ACCESS SCVWD ACCESS ONLY ONLY ONLY ONLYONLYONLY ONLYONLYONLYONLYONLY upup+176'-06''+155'-7 1/2"+141'-6''+141'-6''+155'-7 1/2"+156'-7 1/2"PHASE 1 - MAIN SITE TANTAU DRIVEWAY SCVWD ACCESS SCVWD ACCESS ONLY ONLY ONLY ONLYONLYONLY ONLYONLYONLYONLYONLYDNPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPC PC PCONLYPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPC PC PC PHASE 1 - MAIN SITE TANTAU DRIVEWAY SCVWD ACCESS SCVWD ACCESS ONLY ONLY ONLY ONLYONLYONLY ONLYONLYONLYONLYONLY upup+176'-06''+155'-7 1/2"+141'-6''+141'-6''+155'-7 1/2"+156'-7 1/2"PHASE 1 - MAIN SITE TANTAU DRIVEWAY SCVWD ACCESS SCVWD ACCESS ONLY ONLY ONLY ONLYONLYONLY ONLYONLYONLYONLYONLYDNPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPC PC PCONLYPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPC PC PC P3P3P3 TANTAU 14 BUILDING (2 STORIES) FFL +161'488'-0"88'-0" 02 P-TA14-2.30 01 P-TA14-2.30 (E) RESIDENTIAL CMU WALL TO REMAIN P R O P E R T Y L IN E 5 0 ' R IP A R IA N S E T B A C K RAMP TO BASEMENT PARKING ON GRADE EMPLOYEE / VISITOR PARKING PARKING EGRESS STAIR #1 PARKING EGRESS STAIR #2 150'-0"50' -0" MECHANICAL AIR INTAKE STRUCTURE #3 EMPLOYEE PARKING SECONDARY ENTRANCE (PRUNERIDGE AVE.) MECHANICAL AIR INTAKE STRUCTURE #2 MECHANICAL AIR INTAKE STRUCTURE #1 OUTLINE OF BELOW GRADE PARKING STRUCTURE, SHOWN DASHED EMPLOYEE PARKING MAIN ENTRANCE (NORTH TANTAU AVE.) PUBLIC UTILITY EASEMENT PUBLIC UTILITY EASEMENT PRUNERIDGE AVENUE VISITOR CENTER C A L A B A Z A S C R E E K VISITOR RECPETION THEATER MEADOW AVENUEH U B B A R D A V E N U E APPLE SHUTTLE DROP-OFF / PICK-UP AREA OLIVE TREE GROVE EMPLOYEE BICYCLE PARKING PEDESTRIAN ACCESSIBLE WALKWAY EMPLOYEE BICYCLE PARKING 15' FRONT SETBACKPROPERTY LINE 15' STREET SIDE SETBACK PROPERTY LINEPUBLIC UTILITY EASEMENT 15'-0"PROPERTY LINE150' REAR SETBACKPEDESTRIAN ACCESSIBLE WALKWAY PEDESTRIAN ACCESSIBLE WALKWAY PEDESTRIAN ACCESSIBLE WALKWAY PEDESTRIAN ACCESSIBLE WALKWAY CITY BUS SHELTER DNNORTH TANTAU AVENUETESTING FACILITIES NORTHNORTH TANTAU AVENUE25' REAR SETBACKENCLOSED LOUVERED SERVICE YARD (16'-0" TALL)N. Tantau AvenuePruneridge Avenue © Foster + Partners 2017 N N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. General Notes 1. 2. 3. 4. 5. 6. Do not scale drawings. Dimensions govern. All dimensions are in feet and inches unless noted otherwise. All levels are in feet and inches unless noted otherwise. All dimensions shall be verified on site before proceeding with the work. Foster + Partners shall be notified in writing of any discrepancies. Any areas indicated on this sheet are approximate and indicative only. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street 1" = 40'-0" 00 Apple Inc. Tantau 14 Building Apple Park Phase 2 01/31/2018 P-TA14-2.20 2193 PLANNING APPLICATION Site Plan Site B Proposed 1" = 40'-0"01 Site Plan - Proposed 00 01/31/2018 Planning - Site & Architectural Review F+P PHASE 1 - MAIN SITE TANTAU DRIVEWAY SCVWD ACCESS SCVWD ACCESS ONLY ONLY ONLY ONLYONLYONLY ONLYONLYONLYONLYONLY upup+176'-06''+155'-7 1/2"+141'-6''+141'-6''+155'-7 1/2"+156'-7 1/2"PHASE 1 - MAIN SITE TANTAU DRIVEWAY SCVWD ACCESS SCVWD ACCESS ONLY ONLY ONLY ONLYONLYONLY ONLYONLYONLYONLYONLYDNPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPC PC PCONLYPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPC PC PC PHASE 1 - MAIN SITE TANTAU DRIVEWAY SCVWD ACCESS SCVWD ACCESS ONLY ONLY ONLY ONLYONLYONLY ONLYONLYONLYONLYONLY upup+176'-06''+155'-7 1/2"+141'-6''+141'-6''+155'-7 1/2"+156'-7 1/2"PHASE 1 - MAIN SITE TANTAU DRIVEWAY SCVWD ACCESS SCVWD ACCESS ONLY ONLY ONLY ONLYONLYONLY ONLYONLYONLYONLYONLYDNPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPC PC PCONLYPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPC PC PC P3P3P3 TANTAU 14 (2 STORIES) FFL +161' SECONDARY FIRE ACCESS FROM TANTAU AVENUE SECONDARY FIRE ACCESS FROM PRUNERIDGE AVENUE PARKING SEQUENCE EGRESS STAIRS ACCESSIBLE PATHWAY PARKING SEQUENCE EGRESS STAIRS THEATER H U B B A R D A V E N U E LEGEND PROPERTY LINE ACCESSIBLE PATH OF TRAVEL FIRE ACCESS PUBLIC SIDEWALK PUBLIC SIDEWALK RAMP DNPUBLIC SIDEWALK NORTH TANTAU AVENUEPRUNERIDGE AVENUE VISITOR CENTER C A L A B A Z A S C R E E K VISITOR RECPETION MEADOW AVENUEH U B B A R D A V E N U ENORTH TANTAU AVENUETESTING FACILITIES NORTH P R O P E R T Y L IN E50' R IP A R IA N S E T B A C K 15' FRONT SETBACKPROPERTY LINE 15' STREET SIDE SETBACK PROPERTY LINEPROPERTY LINE150' REAR SETBACKFIRE HYDRANT FIRE HYDRANT FDC BACKFLOW FIRE HYDRANT BELOW GRADE PARKING STRUCTURE, SHOWN DASHED BELOW GRADE PARKING STRUCTURE, SHOWN DASHED ENCLOSED LOUVERED SERVICE YARD N. Tantau AvenuePruneridge Avenue © Foster + Partners 2017 N N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. General Notes 1. 2. 3. 4. 5. 6. Do not scale drawings. Dimensions govern. All dimensions are in feet and inches unless noted otherwise. All levels are in feet and inches unless noted otherwise. All dimensions shall be verified on site before proceeding with the work. Foster + Partners shall be notified in writing of any discrepancies. Any areas indicated on this sheet are approximate and indicative only. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street 1" = 40'-0" 00 Apple Inc. Tantau 14 Building Apple Park Phase 2 01/31/2018 P-TA14-2.21 2193 PLANNING APPLICATION Site Plan Site B Proposed Fire Access - Accessibility 1" = 40'-0"01 Site Plan - Fire Access / Accessibility Plan 00 01/31/2018 Planning - Site & Architectural Review F+P PROPERTY LINE15' FRONT SETBACKPRUNERIDGE AVECALABAZAS CREEKPROPERTY LINE50' SETBACKRIPARIAN CORRIDOROFFICE SPACE OFFICE SPACE OFFICE SPACE OFFICE SPACE LOUVERED MECHANICAL SCREEN LEVEL 02 - CORE LEVEL 01 - CORE 04 DRIVEWAY STAIR & ELEVATOR OVERRUN LOUVERED MECHANICAL PENTHOUSE GREEN ROOF VISITOR CENTER 14' - 1 1/2" B.O. LEVEL 01 SLAB 27' - 3 1/2" B.O. LEVEL 02 SLAB TOP 31' - 2 1/2" FFL 16' - 10 1/2" VISITOR RECEPTION MECHANICAL SHAFT #4MECHANICAL SHAFT #3MECHANICAL SHAFT #1 MECHANICAL SHAFT #2 TOP 40' - 3 1/2" LOUVERED MECH. PENTHOUSE AHU #1 AHU #2 AHU #3 AHU #4 MECH. EQUIP. PAD TOW 39' - 1" LOUVERED MECH. SCREEN LEVEL B01 - CORE LEVEL B02 - CORE LEVEL B03 - CORE LEVEL 02 - CORE LEVEL 01 - CORE PROPERTY LINE1:1 SLOPE 60' HEIGHT SETBACK (MAX.)PROPERTY LINE15' FRONT SETBACK150' REAR SETBACK03 N. TANTAU AVE25' REAR SETBACKTOP 31' - 2 1/2" TOP 40' - 3 1/2" TOW 39' - 1" LOUVER MECH. SCREEN LOUVER MECH. PENTHOUSE LEVEL 02 LEVEL 01 FFL 0' - 0" FFL 16' - 10 1/2" SSL -20' - 11" SSL -31' - 5" SSL -41' - 11" LEVEL B01 LEVEL B02 LEVEL B03 LOUVERED MECHANICAL SCREEN LOUVERED MECHANICAL PENTHOUSEFRONT SETBACK LEVEL B01 - CORE LEVEL B02 - CORE LEVEL B03 - CORE LEVEL B01 - PARKING LEVEL B02 - PARKING LEVEL B03 - PARKING PARKING RAMP PARKING RAMP DRIVE ASILE DROP-OFF EXIT STAIR WALL AIR INTAKE RESIDENTIAL SOUND WALL 16' HEIGHT SETBACK (MAX.) DRIVE ASILE DRIVE ASILE 0'-6" A.F.G. T.O.W. 8'-0" A.F.G.T.O.W. 3'-6" A.F.G. VTA BUS SHELTER 6'-0"7'-10 1/2"LOUVERED MECH. SCREEN LOUVERED MECH. PENTHOUSE TOW 39' - 1" TOP 40' - 3 1/2" TOP 31' - 2 1/2" U/S SLAB 27' - 3 1/2" 16'-0" LOUVERED MECH. SCREEN MECHANICAL SHAFT #1 U/S SLAB 27' - 3 1/2" TOP 31' - 2 1/2" TOW 39' - 1" TOW 38' - 9 1/2"N. Tantau AvenuePruneridge Avenue © Foster + Partners 2017 N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. General Notes 1. 2. 3. 4. 5. 6. Do not scale drawings. Dimensions govern. All dimensions are in feet and inches unless noted otherwise. All levels are in feet and inches unless noted otherwise. All dimensions shall be verified on site before proceeding with the work. Foster + Partners shall be notified in writing of any discrepancies. Any areas indicated on this sheet are approximate and indicative only. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street As indicated 00 Apple Inc. Tantau 14 Building Apple Park Phase 2 01/31/2018 P-TA14-2.30 2193 PLANNING APPLICATION Site Sections 1" = 30'-0"02 Longitudinal Site Section 1" = 20'-0"01 Cross Site Section 1/4" = 1'-0"03 Mechanical Screen - Typical Detail 1/4" = 1'-0"04 Mechanical Screen - Typical Detail 00 01/31/2018 Planning - Site & Architectural Review F+P N. Tantau AvenuePruneridge Avenue © Foster + Partners 2017 N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street 00 Apple Inc. Tantau 14 Building Apple Park Phase 2 01/31/2018 NTS P-TA14-2.40 2193 PLANNING APPLICATION Perspective View Pruneridge Avenue Looking West 01 Render- Pruneridge Avenue Looking West 00 01/31/2018 Planning - Site & Architectural Review F+P N. Tantau AvenuePruneridge Avenue © Foster + Partners 2017 N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street 00 Apple Inc. Tantau 14 Building Apple Park Phase 2 01/31/2018 NTS P-TA14-2.41 2193 PLANNING APPLICATION Perspective View Pruneridge Avenue Looking East 01 Render- Pruneridge Avenue Looking East 00 01/31/2018 Planning - Site & Architectural Review F+P Site - Civil 01 1" = 40'-0" P-TA14-3.00 Topography Existing Existing Topography Plan BuildingVisitor Center 10600 N. Tantau Ave Tantau 4 10590 - 10596 N. Tantau Ave Tantau 3 ONLYONLYONLY ONLY ONLYONLYONLY ONLYONLYONLY RSVEV ONLYONLY North Tantau AvenueNorth Tantau AvenueNorth Tantau AvenuePruneridge Avenue 160160 160160 160165 155 155 160 160 1601601 5 5 155 155 160 10670 N. Tantau AveTantau 5Calabazas Creek Calabazas Creek Legend 1 Feet Minor Contour 5 Feet Minor Contour 1" = 40'-0"2193 N Title Project No. Date Scale at Arch E1 Number Revision Apple Inc. Phase 2 Apple Park Tantau 14 Building PLANNING APPLICATION 00 01/31/2018 F+PPlanning - Site & Architectural Review 00 01/31/2018 © Foster + Partners 2017 N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street N. Tantau AvenuePruneridge Avenue 01 1" = 40'-0" P-TA14-3.10 Plan Proposed Grading Proposed Grading Plan BuildingVisitor Center ONLYONLYONLY ONLY ONLYONLYONLY ONLYONLYONLYONLY +176'-06''upup+155'-7 1/2"+141'-6''+141'-6''+155'-7 1/2"+156'-7 1/2"RSVEV ONLYPA PA PA PA DNNorth Tantau AvenueNorth Tantau AvenueNorth Tantau AvenuePruneridge Avenue Parking Structure Tantau 14 Tantau 14 Tantau 14 Calabazas Creek Calabazas Creek FFL 161.0 FFL 161.0 creek bank Water District (SCVWD) Santa Clara Valley Match existing grade at outline (typ) Proposed basement (typ) existing wall to remain Match existing grade at back of sidewalk recently constructed Match existing grade at Notes Legend 1" = 40'-0"2193 N Title Project No. Date Scale at Arch E1 Number Revision Surfaces shall be grade to provide positive drainage away from structures and buildings. Minimum slope at paved areas is typically 0.5%, and minimum at landscaped areas is 1% unless subdrainage is provided. Maintain existing grade at all trees to be preserved. Do not disturb grade withing dripline of trees indicated unless otherwise noted. No equipment, stockpiling, or debris may be stored within tree root zone. Preliminary earthwork studies with bank volumes (no soil bulking/shrinkage) will be provided at formal submission: Earthworks calculations to follow Potential strategies to decrease the amount of material to be imported / off-hauled will be further studied during the detailed design process. 1. 2. 3. 4. 5. 1 Feet Minor Contour 5 Feet Minor Contour 1 Feet Existing Minor Contour 5 Feet Existing Minor Contour Apple Inc. Phase 2 Apple Park Tantau 14 Building PLANNING APPLICATION 00 01/31/2018 F+PPlanning - Site & Architectural Review 00 01/31/2018 © Foster + Partners 2017 N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street N. Tantau AvenuePruneridge Avenue 01 1" = 40'-0" P-TA14-3.30 Water Control Proposed Storm Proposed Stormwater Control Plan CB-TC 155.56INV 152.10 6" (IN-SW)INV 151.61 12" (OUT-S)SDMH-RIM 157.07 INV 150.37 15" (IN-S) INV 150.37 30" (IN-E) INV 148.97 33" (IN-W) INV 148.77 33" (OUT-N) SDMH-RIM 157.18 INV 150.57 12" (IN-N) INV 149.79 15" (IN-S) INV 149.37 30" (IN-W) INV 149.29 33" (OUT-E) SDCO SDCO SDMH-RIM 157.94 INV 152.35 10" (IN-W) INV 151.74 12" (OUT-N) INV 151.74 10" (IN-E) CB-TC 155.37 INV 151.46 12" (IN-N) INV 151.46 12" (IN-S) INV 151.42 12" (OUT-NW)12"SD ~ ~ SDMH-RIM 160.45INV 156.42 12" (IN-E)INV 156.30 12" (IN-W)INV 156.17 15" (OUT-N)CB-TC 160.25INV 156.56 12" (THRU)SDMH-RIM 163.89INV 160.07 6" (IN-E)INV 157.01 6" (IN-S)INV 156.95 6" (OUT-N) ~6" SD 6" SD12" SD SDMH-RIM 156.68 INV 151.63 12" (IN-SE) INV 151.23 12" (IN-SW) INV 151.17 12" (IN-N) INV 151.16 12" (OUT-E) ~ ~ ~12" SD12" SD12" SD12" SD ~INV 160.20 12" (OUT-E)INV 160.59 12" (IN-S)INV 160.25 12" (IN-SW)SDMH-RIM 164.31INV 160.02 12" (IN-E)INV 159.93 12" (IN-W)INV 159.61 18" (IN-S)INV 159.45 18" (OUT-N)CB-TC 164.00INV 160.06 12" (THRU)12"SD 12"SD 12"SD CB-TC 160.09INV 156.36 12" (OUT) 18" SDOUTFALL FL-155.9818"S D CB-TC 155.41 15" SD CB-TC 156.52 INV 151.07 12" (IN-W) INV 151.02 15" (OUT-N) 15" SD12" SD DI-RIM 156.32 INV 151.46 10" (IN-S) INV 151.42 12" (IN-E) DI-RIM 158.35 INV 155.05 10" (OUT-NE)10" SD DI-RIM 158.68 INV 156.83 12" (OUT-S) DI-RIM 159.03 INV 156.99 12" (OUT-E) DI-RIM 161.49 INV 159.25 12" (OUT-SW) SDMH-RIM 162.71 INV 158.76 12" (IN-SW) INV 158.51 12" (IN-NE) INV 157.81 12" (IN-W) INV 157.76 12" (OUT-N) DI-RIM 162.71INV 158.75 12" (IN-W)INV 158.51 15" (OUT-S)DI-RIM 162.53 INV 160.93 4" (IN-S) INV 159.72 12" (IN-NW) INV 159.67 12" (OUT-NE) 12" SD 1 5 " S DDI-RIM 162.32 INV 160.99 4" (IN-S) DI-RIM 162.53 INV 160.03 10" (IN-SW) INV 159.99 12" (OUT-SE) DI-RIM 160.25 SD PUMP (FULL OF DEBRIS) DI-RIM 161.48 INV 157.78 12" (THRU) 12" SD 12" SD SDMH-RIM 164.60 (UNABLE TO DIP) DI-RIM 167.47 INV 162.33 15" (IN-W) INV 162.24 15" (OUT-S) ~(FULL OF WATER) INV 156.72 15" OUTFALL 15" SD ~DI-RIM 163.91 INV 162.69 10" (OUT-S) DI-RIM 164.30 INV 160.90 10" (IN-N) INV 160.80 10" (OUT-E) 10" SD10" SD1 5 " S D INV 156.12 12" OUTFALL 30" SD 12" SD33" SD 33" SD 12 " SD 12" SD10" SD DI-RIM 160.43 INV 157.35 12" (IN-S) INV 157.31 12" (OUT-N) DI-RIM 162.41 INV 159.58 4" (IN-SW) INV 158.31 12" (OUT-N)12" SD12" SDSDMH-RIM 159.8INV 154.3 10" (IN/OUT-N/S)INV 154.4 8" (IN-SE)10" SD10" SDSDMH-RIM 160.2INV 153.0 10" (IN/OUT-S/NE)DI-RIM 160.5 INV 158.5 6" (OUT-NW)BuildingVisitor Center ONLYONLYONLY ONLY ONLYONLYONLY ONLYONLYONLYONLY +176'-06''upup+155'-7 1/2"+141'-6''+141'-6''+155'-7 1/2"+156'-7 1/2"RSVEV ONLYPA PA PA PA DNNorth Tantau AvenueNorth Tantau AvenueNorth Tantau AvenuePruneridge Avenue Parking Structure Tantau 14 Tantau 14 Tantau 14 Calabazas Creek Calabazas Creek Notes Legend Capacity of the existing systems at points of connection to be confirmed. Preliminary storm drainage layout shows major pipe network, details such as pipe sizes, invert elevations, manholes, etc to be determined. Stormwater quality Best Management Practices (BMP's) will be designed in accordance with City of Cupertino requirements and the Santa Clara Valley Urban Runoff Pollution Prevention Program NPDES permit (C.3). BMP's are illustratively shown with areas approximately 4% of the contributing impervious watershed. Treatment areas are shown illustratively, pending coordination with landscape design to be determined. 1. 2. 3. 4. Proposed Storm Drain Potential stormwater quality treatment/conveyance area 1" = 40'-0"2193 N Title Project No. Date Scale at Arch E1 Number Revision Apple Inc. Phase 2 Apple Park Tantau 14 Building PLANNING APPLICATION 00 01/31/2018 F+PPlanning - Site & Architectural Review 00 01/31/2018 © Foster + Partners 2017 N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street N. Tantau AvenuePruneridge Avenue Overflow drain with mesh insert Connect to storm drain Drain mat and waterproofing Mulch and filter fabric, typ. Sidewalk paving Street paving Curb cut - drain inlet Concrete curb & gutter Standard tree grate Subgrade Planting Subgrade Note To storm drain varies area Bottom (typ.) 3:1 side slopes Vegetated ground cover Perforated overflow pipe architect per landscape planting soil mix 18" min filter media Notes Standpipe 1:1 side slope 3" stone or mulch Inlet 1:1 Side slope Native soil mix per landscape architect 18" min filter media planting soil 0.5% min Variable side slope 3:1 max. 6" min drain storm To 2" min Vegetated ground cover 4" 8" area not to exceed 2% Slope of main bioretention Freeboard depth varies (min 3") Vegetated ground cover Height 2' to 6' (20' to 40' top width) 10' bottom width typical within 10 feet of structure where bioretention area is Waterproof lining required soil for erosion control. geotextile between cobbles and of 2' either side of inlet. Place (grouted in place) for min distance 4" min diameter approved cobble architect Soil per landscape planted. based on tree species area to be determined area. Radius of treeless No tree planting in this landsape architect Planting type per 2" min pea gravel2% maxfinished grade. See Note 4 Cleanout with cap at Detail 08. spacings. Trash screen per Overflow riser at max 100 feet per Detail 08. of planting area. Trash screen spacings. 12" above low point Overflow riser at max 100ft architect Soil per landscape to storm drain Underdrain, connected planter drain. Place just above base of Underdrain, connected to storm 4. 3. 2. 1. Ponding depth 12" Bottom width 6ft Area, Detail 01 Bioretention Build-up per Detail 01 Bioretention Area, cleanouts) per Underdrains (including Note 1. 1 ft (typ.) per landscape architect medium planting soil mix Min 18" depth fllter at finish grade. Cleanout with cap drainage rock 12" depth waterproof membrane planter wall with Concrete structural Connect to storm drain Detail 01. Omitted for clarity. Overflow risers shall be included per Biorention Area surround min 6" drain rock. connected to storm drain. Pipe Underdrain, min 4" perforated pipe slope 3:1 max. side 6' bottom width (typ.) slope 3:1 max. side (0.1% - 0.5% typ) shallow longitudinal slope Swales typically have (0.1% - 0.5% typ) shallow longitudinal slope Swales typically have centers. x 12" drain box at 100 feet Overflow riser with grate. 12" 12" min drain rock. and at curb cuts. Grouted rip rap apron to be provided at connections to buildings tight cap fit flush with the biotreatment soil surface. vertical, rigid, non- perforated HDPE pipe ( min 4") with a water A cleanout shall be provided for underdrains, consisting of a the drain rock. the underdrain or between the filter media planting soil mix and To avoid clogging, filter fabric should not be used in or around point. at a minimum 0.5% slope toward the storm drain or discharge Underdrains shall be placed with perforations facing downward, Minimum two rows of perforations shall be provided. perforated pipe connecting to a storm drain or discharge point. The underdrain shall consist of a minimum 4" diameter the base of the trench. waterproof fabric. Otherwise underdrains should be installed at least 6" above If waterproof lining is included, underdrains should be placed just above the biotreatment soil surface. perforated HDPE pipe (min 4") with a water tight cap fit flush with the A cleanout shall be provided for underdrains, consisting of a vertical, rigid, non- between the filter media planting soil mix and the drain rock. To avoid clogging, filter fabric should not be used in or around the underdrain or downward, at a minimum 0.5% slope toward the storm drain or discharge point. shall be provided. Underdrains shall be placed with perforations facing connecting to a storm drain or discharge point. Minimum two rows of perforation The underdrain shall consist of a minimum 4" diameter perforated pipe 4. 3. 2. 1. P-TA14-3.31 Typical Details Stormwater Quality BMP NTS 1" = 40'-0"2193 Title Project No. Date Scale at Arch E1 Number Revision Apple Inc. Phase 2 Apple Park Tantau 14 Building PLANNING APPLICATION 00 01/31/2018 F+PPlanning - Site & Architectural Review 00 01/31/2018 © Foster + Partners 2017 N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street N. Tantau AvenuePruneridge Avenue NTS04 NTS05Bioretention Swale NTS01 NTS07Conveyance Swale Flow through planter NTS06Overflow Conveyance Swale for Large Rainfall Events Bioretention Area Elevation Plan NTS02Bioretention Tree Planter 01 1" = 40'-0" P-TA14-3.40 Plan Existing Utilities Existing Utilities Plan BuildingVisitor Center 151.72 +/- INV151.72 +/- INV 153.62 INV +/- 152.00 INV 152.30 INV 152.30 INV 152.10 +/- INV 152.17 +/- INV 152.36 +/- INV 152.36 INV152.36 INV 152.36 +/- INV 152.17 +/- INV 152.10 +/- INV 152.30 INV 152.30 INV 152.00 INV 153.62 INV +/-10"VCPEB CAB TSB EL METER TSB TMH(AT&T 77-1) TSB SLB TSB EV EB EB FOB EV EV EB TSB 12"SD TSB EB ~6" SD 6" SD12" SD 10" SS8" SS 10" SS ~8" SS10" SS ~ ~ ~12" SD12" SD12" SD12" SDFOB WV WV10"SS12"SD ~10"SS8"SS 10"SS 5.5" 3550 26.8" 3551 22" 3552 1.7" 3553 3.3" 3554 3.4" 3555 44" 3556 37" 3557 16.5" 3558 23.9" 3559 10.4" 3560 32" 3561 14" 3562 22" 3563 12.5" 3564 11.2" 3565 15" 3567 17.5" 3568 8.8" 3569 6" 3570 7" 3571 32.5" 3572 12.8" 3574 13" 3575 13.8" 3576 11.5" 3579 30" 3580 14" 3581 4" 3582 17.1" 3583 31" 3584 2.7" 3585 4.3" 3586 16" 3587 8" 3588 7" 3589 4.5" 3590 3.5" 3591 8.5" 3592 8" 3593 13.5" 3596 6" 3597 3" 3598 1.3" 3599 31" 3600 16.5" 3601 13" 3602 17.5" 3603 23.5" 3604 25.5" 3605 18.7" 3606 17.7" 3607 26" 3608 2.5" 3609 3" 3613 4" 3614 3615 5" 3617 4" 3618 5" 6" 5049 4" 5050 15" 5051 17" 5052 15" 5053 24" 5054 34" 5055 18" 5056 18" 5057 23" 5058 13" 5059 17" 5060 23" 5061 17" 5062 23" 5063 17" 5064 21" 5065 18"S D ~ 5" 5048 8" VCP 6" FS TMH(AT&T 77-1) EMH(303) (2)4" DUCT(12KV)15" SD 33" SD 12" SD 12" SD10" SD 12" SD12" SDAT&T VAULT DOUBLE MH AT&T 76-230 AT&T SB-411 PG&E PG&E 20098 PG&E 51832 PG&E 11216 EB 10" SD10" SDONLYONLYONLY ONLY ONLYONLYONLY ONLYONLYONLY RSVEV ONLYONLY Tantau 3 Tantau 4 (Doc No. 22760863) 20.00' E.A.E. (7757 O.R. 626) 5.50' P.U.E.-PARCEL 1-21A (0470 O.R. 641) PG&E EASEMENT (Doc No. 14440161) (C110 O.R. 13) 5.50' PG&E EASEMENT (7757 O.R. 626) P.U.E.-PARCEL 1-19A (879 M 19-25) 7.50' P.U.E. (288 O.R. 682) PG&E EASEMENT-STRIP 1 (0333 O.R. 739) 10.00' PG&E EASEMENT-STRIP 1 (0333 O.R. 739) 5.50' PG&E EASEMENT-STRIP 2 (7757 O.R. 626) 5.50' P.U.E.-PARCEL 1-21A FO153.14 inv +/- 153.03 inv +/- +/- +/- STUB +/-STUB +/- STUB +/- 151.37 INV 151.70 INV 151.65 INV 151.91 INV 152.38 INV 152.12 INV 152.53 INV 153.25 INV 153.18 INV 152.60 INV INV 148.32 OUT N INV 148.32 IN S INV 148.42 IN W 162.9 MH TAN4 48" Clean Out Clean Out 152.60 INV 153.18 INV 153.25 INV 152.53 INV 152.12 INV 152.38 INV 151.91 INV 151.65 INV 151.70 INV 151.37 INV STUB +/-STUB +/- STUB +/- +/- +/- 153.03 inv +/- 148.42 inv 149.76 inv +/- 153.14 inv +/- 12" Water 3" Gas 10" Sanitary Sewer Telecomm Electrical Apple Fiber 15" Storm Drain Apple Fiber 152.85 inv +/-152.85 inv +/- 152.66 inv +/- 152.66 inv +/-152.66 inv +/- 152.66 inv +/- Legend Water/Fire Service Sanitary Sewer Gas Electrical Fiber Optic/Telecomm Storm Drainage 1" = 40'-0"2193 N Title Project No. Date Scale at Arch E1 Number Revision Apple Inc. Phase 2 Apple Park Tantau 14 Building PLANNING APPLICATION 00 01/31/2018 F+PPlanning - Site & Architectural Review 00 01/31/2018 © Foster + Partners 2017 N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street N. Tantau AvenuePruneridge Avenue 01 1" = 40'-0" P-TA14-3.50 Plan Proposed Utilities Proposed Utilities Plan 10"VCPEB TSB TSB TSB WB EB CAB TSB EL METER TSB TMH(AT&T 77-1) TSB EB SLB TSB TSB TB (SB74-226) TB (SB83-411) TSB EV EB EB EB SLB TSB TSB COMM EV TSB SLB TSB FOB EV EV EB TSB EV SLB EB EV EV EMH 387 IRR CAB 12"SD ~ ~ ~G TSB EB COMM ~6" SD 6" SD12" SD 10" SS8" SS 10" SS ~8" SS ~ 10" SS ~ ~ ~12" SD12" SD12" SD12" SD ~ FOB WV WV 8"SS 8" S S 12"SD 12"SD10"SS12"SD ~10"SS8"SS 10"SS 18" SD18"S D SLB ~ 12" ACP12" ACP 15" SD10" SD 8" VCP GV 6" ACP 6" FS ELEC TMH(AT&T 77-1)3" GAS(2)5" DUCT (CONCRETE ENCASED)EMH(303) (2)4" DUCT(12KV)15" SD ~1 5 " S D 12" SD33" SD 33" SD 12" SD 12" SD10" SD27" VCP12" SD TSB TSB ~AT&T VAULT DOUBLE MH AT&T 76-230 AT&T SB-411 4" FSMCI/VERIZON HH-6-2020 PG&E SW-11214 PG&E PG&E 20098 PG&E PG&E 51832 PG&E 11216 PG&E J-1783 PG&E SW-7898 PG&E SW-8208 PG&E SW-11216 EB 10" SD10" SDVisitor Center BuildingONLYONLYONLY ONLY ONLYONLYONLY ONLYONLYONLYONLY +176'-06''upup+155'-7 1/2"+141'-6''+141'-6''+155'-7 1/2"+156'-7 1/2"RSVEV ONLYPA PA PA PA DNNorth Tantau AvenueNorth Tantau AvenueNorth Tantau AvenuePruneridge Avenue Tantau 14 Parking Structure Tantau 14 Tantau 14 Calabazas Creek Calabazas Creek N=8728.65 E=11913.80 N=8728.65 E =11878.52N=9633.66E=11884.88STUB +/-STUB +/- STUB +/- +/- +/- SS 148.42 inv 149.76 inv +/- 11261 155.168 conduit 155.17 conduit 10340 155.701 jointtrench 10339 155.982 jointtrench 10123 156.039 ss 156.04 ss 143.96 inv 10341 156.071 jointtrench 11214 156.241 ss 156.24 ss 10338 156.242 jointtrench 10337 156.708 jointtrench 10335 156.861 jointtrench 10364 156.927 jointtrench 10366 157.507 jointtrench 10368 157.579 jointtrench 162.5 ss co FO parking ordinance with the standards of the Parking lot lighting will comply parking ordinance with the standards of the Parking lot lighting will comply drainage existing storm Connect to existing gas line Connect to electrical lines Connect to existing drainage existing storm Connect to drainage existing storm Connect to existing water line Connect to services existing water Connect to sanitary sewer line Connect to existing sanitary sewer line Connect to existing telecomm vault Connect to existing transformer Proposed fiber vault existing Apple Connect to Notes Legend Water/Fire Service Sanitary Sewer Gas Electrical Fiber Optic/Telecomm Storm Drainage Existing Water/Fire Service Existing Sanitary Sewer Existing Gas Existing Electrical Existing Fiber Optic/Telecomm Existing Storm Drainage 1" = 40'-0"2193 N Title Project No. Date Scale at Arch E1 Number Revision Capacity of the existing utility systems at points of connection to be confirmed. Existing fire hydrants around site perimeter will remain in place as possible per site plan. Unless external agencies or site conditions require otherwise, vaults, boxes, etc. shall typically be flush to finish grade aligned and set parallel to adjacent joints, curbs, etc. 1. 2. 3. Apple Inc. Phase 2 Apple Park Tantau 14 Building PLANNING APPLICATION 00 01/31/2018 F+PPlanning - Site & Architectural Review 00 01/31/2018 © Foster + Partners 2017 N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street N. Tantau AvenuePruneridge Avenue Site - Landscape FFAED15' Front Setback25' Interior Side Setback 150' Interior Side Setback From Residential (Buildings Taller Than 16')50' C re e k S e t b a c k 15' Street Side Setback 15' Street Side Setback Public Utility Easement Public Utility Easement CALABAZAS CREEK CORR IDOR 360317.5356010.435904.535824357232.536021335991.3355923.93589735811435717360116.535983355816.5358883580303570635671536003135976358716357911.535698.8359613.5356817.5356511.2356412.5358431357613.83563223593835751335621435928.5360423.535913.5358317.1355126355226360525.5360618.7360717.715' Front Setback25' Interior Side Setback 150' Interior Side Setback From Residential (Buildings Taller Than 16')50' C re e k S e t b a c k 15' Street Side Setback 15' Street Side Setback Public Utility Easement Public Utility Easement LEGENDTAG#DBH 1" = 40'-0"00Apple Inc.Tantau 14 BuildingApple ParkPhase 201/31/2018PLANNING APPLICATION 1" = 40'-0"0100 01/31/2018 Planning - Site & Architectural ReviewF+P© Foster + Partners 2017NNClientProjectTitleProject No. DateScale at Arch E1NumberKey Plan.General Notes1.2.3.4.5.6.Do not scale drawings. Dimensions govern.All dimensions are in feet and inches unless noted otherwise.All levels are in feet and inches unless noted otherwise.All dimensions shall be verified on site before proceeding with the work.Foster + Partners shall be notified in writing of any discrepancies.Any areas indicated on this sheet are approximate and indicative only.Rev. DateReason For IssueChkRevisionSuite 240San Francisco, CA 94111www.fosterandpartners.comT 408 610 5800OLINLuk and AssociatesPhiladephia, PA 19106T 215 440 0030 / Fax 215 440 0041OLIN Partnership. Ltdwww.theolinstudion.com738 Alfred Nobel DriveHercules, CA 94547www.lukassociates.comT 510 724 3388150 South Independence Mall WestPublic Ledger Building, Suite 1123LANDSCAPE ARCHITECTURE AND URBAN DESIGN1000 Samsome StreetN. Tantau Avenue Pruneridge AvenueAll dimensions shall be verified on site before proceedingwith the work.OLIN shall be notified in writing of any discrepancies.Do not scale drawings. Dimensions govern.1.2.3.4.General Notes5. Any areas indicated on this sheet are approximate andindicative only.All dimensions are in feet and inches unless noted otherwise.P-TA14-X.XX2193Sheet NameDrawing NamePlanning - Site & Architectural Review 1" = 40'-0"Tantau 14 BuildingApple ParkPhase 201/31/2018Existing Tree Plan0 40'20'80'1738P-TA14-4.00Existing Tree PlanDB00 FFAED15' Front Setback25' Interior Side Setback 150' Interior Side Setback From Residential (Buildings Taller Than 16')50' C r e e k Se t b a c k 15' Street Side Setback 15' Street Side Setback Public Utility Easement Public Utility Easement CALABAZAS CREEK CORR IDOR LEGEND 1" = 40'-0"Tantau 14 BuildingApple ParkPhase 201/31/2018173800Total Existing Trees:43Existing Trees to be Removed: 43Existing Trees to Remain: 0Existing Trees to be Transplanted 00 40'20'80'DB 1" = 40'-0"00Apple Inc.Tantau 14 BuildingApple ParkPhase 201/31/2018PLANNING APPLICATION 1" = 40'-0"0100 01/31/2018 Planning - Site & Architectural ReviewF+P© Foster + Partners 2017NNClientProjectTitleProject No. DateScale at Arch E1NumberKey Plan.General Notes1.2.3.4.5.6.Do not scale drawings. Dimensions govern.All dimensions are in feet and inches unless noted otherwise.All levels are in feet and inches unless noted otherwise.All dimensions shall be verified on site before proceeding with the work.Foster + Partners shall be notified in writing of any discrepancies.Any areas indicated on this sheet are approximate and indicative only.Rev. DateReason For IssueChkRevisionSuite 240San Francisco, CA 94111www.fosterandpartners.comT 408 610 5800OLINLuk and AssociatesPhiladephia, PA 19106T 215 440 0030 / Fax 215 440 0041OLIN Partnership. Ltdwww.theolinstudion.com738 Alfred Nobel DriveHercules, CA 94547www.lukassociates.comT 510 724 3388150 South Independence Mall WestPublic Ledger Building, Suite 1123LANDSCAPE ARCHITECTURE AND URBAN DESIGN1000 Samsome StreetN. Tantau Avenue Pruneridge AvenueAll dimensions shall be verified on site before proceedingwith the work.OLIN shall be notified in writing of any discrepancies.Do not scale drawings. Dimensions govern.1.2.3.4.General Notes5. Any areas indicated on this sheet are approximate andindicative only.All dimensions are in feet and inches unless noted otherwise.P-TA14-X.XX2193Sheet NameDrawing NamePlanning - Site & Architectural ReviewP-TA-14-4.10Proposed Tree Disposition PlanProposed Tree DispositionPlan 01 Tree Disposition Plan - North 1"=100' (1:1200) P-TA14-4.15 North (Sheet 1 of 2) Tree Disposition Plan 1001 1004 1005 1006 1008 1009 1010 1011 1012 1013 1014 1015 1016 1017 1020 1028 1030 1035 1041 1042 1044 1047 1048 1049 1050 1051 1053 1054 1055 1056 1057 1058 1059 1060 1061 1062 1063 1064 1065 1066 1067 1068 1069 107010711072 1073 1074 1075 1077 1078 1079 1080 1081 1082 1083 1084 1085 1086 1087 1088 1089 1090 1091 1092 1093 1094 10951096 1097 10991101 1102 1104 1106 1109 1110 1111 1113 1120 1125 1127 1128 1129 1130 1131 1132 1135 1137 1140 11411142 1143 1144 1145 1146 1147 1148 1149 1150 1151 11531155 1156 1157115811601161 1162 1163 1164 1165 1166 1167 1168 1169 1170 1171 1172 1173 1174 1175 1176 1177 1178 1179 1180 1181 1182 1183 1185 1186 1188 1190 1192 1193 1194 1196 1197 1198 1199 1200 1201 1202 1203 1204 1205 1206 1207 1208 1209 1210 1211 1212 12131214 1215 1216 1217 1218 1219 1220 1221 1222 1223 1224 1225 1226 1227 1228 1229 12301231 1232 1233 1234 1235 1236 1237 1238 1239 1240 1241 1242 1243 1244 1245 1246 12471248 1249 1250 1251 1252 1253 1254 1255 1256 1257 1258 1259 1260 1261 1262126312641265 12661267 1268 1269 1270 1271 1272 1273 1274 1275 1276 1277 1278 1279 1280 1281 1282 1283 1285 1286 1287 1289 1290 1291 1292 1293 1294 1295 1296 1298 1299 1300 1301 1302 1303 1304 1306 1307 1308 1312 1313 1314 1315 1317 1318 13191320 1321 1323 1325 1326 1327 1328 1329 1330 1331 1332 1333 1334 1335 1336 1337 1338 1339 1340 1341 1342 1343 1344 1345 1346 1347 1348 1349 1350 1351 1352 1353 135413551356 1357 1358 1359 1360 1361 1362 1363 1364 1365 1366 1367 1368 1369 1370 1371 1372 1373 1374 13751376 1377 1378 1379 1380 1381 1382 1383 1384 1385 1386 1387 1388 1389 1390 1391 13921393 1394 1395 1396 1397 1398 1399 1400 1401 1402 1403 1404 1405 1406 1407 1409 141014111412 1413 1414 1415 1416 1417 1418 1419 1420 1421 1422 1423 1425 1427 1428 1429 1430 1431 1432 1433 1434 1435 1436 1437 1438 1439 14401441 1442 1443 1444 1445 1446 1447 144814491450 1451 1452 1453 1454 14551456 14571458 1462 1463 1464 1465 1466 1467 1468 1469 1470 1472 1473 1474 1475 14761477 1479 1482 1483 14841485 1486 1487 1488 1489 1490 14911492 1493 1494 1495 1496 1497 1498 1499 1500 1501 1502 1503 1504 1506 1507 1514 1515 1516 1517 1518 1519 1520 1521 1522 1523 1524 1525 1526 1527 1528 1529 1531 1532 1533 1534 1535 1536 1537 1538 1539 1540 1541 1542 1543 1544 1545 1546 1547 1548 1549 1550 1551 1552 1553 1554 1555 1556 1557 1558 1559 1560 1561 1562 1563 1564 1565 1566 1567 1568 1569 1570 1571 1572 15731574 1575 1576 1577 1578 1579 1580 1581 1582 1583 1584 1585 1586 1587 1588 1589 1590 1591 1592 1593 1594 1595 1596 1597 1598 1599 1600 1601 1602 1603 1604 1605 1606 1607 1608 1609 1610 1611 1612 1613 1614 1615 1616 1617 1618 1619 1620 1621 1622 1623 1624 1625 1626 1627 1628 1629 1630 1631 1632 1633 1634 1635 16361637 1638 1639 1640 1641 1642 1643 1644 1645 1646 1647 1648 1649 1650 1651 1652 1653 1654 1655 1656 1657 1658 1659 1660 1661 1662 1663 1664 1665 1666 1667 1668 16691670 1671 1672 1673 1674 1675 1676 1677 1678 1679 1680 1681 1682 1683 1684 1685 1686 1687 1688 1689 1690 1691 1692 1693 1694 1695 1696 1697 1698 1699 1700 1701 1702 1703 1704 1705 1706 1707 1708 1709 1710 1711 1712 1713 1714 1715 1716 1717 1718 1719 1720 1721 1722 1723 1724 17251726 1727 1728 1729 1730 1731 1732 1733 1734 1735 1736 1737 1738 1739 1740 1741 17421743 1744 1745 1746 1747 1748 1749 1750 1751 1752 1753 1754 1755 1756 1757 1758 1759 1760 1761 1762 17631765 1768 1771 1772 1773177417751776 17771778 1779 1780 1781 1782 1783 1784 1785 1786 1787 1788 1789 1790 1791 1792 1793 1794 1795 1796 1797 1798 1799 1800 1801 1802 1803 1804 1805 1806 1807 1808 1809 1810 1811 1812 1813 1814 1815 1816 1817 1818 1819 1820 1821 1822 1823 1824 1825 1826 1827 1829 1831 1833 1834 1835 1836 1837 1838 1839 1840 1841 1842 1843 1844 1845 1848 1851 1852 1853 1854 1855 1856 1857 1858 1859 1860 1861 1862 1863 1864 1865 1866 1868 1869 1870 1871 1872 1873 1874 1875 1876 1877 1878 1879 1880 1881 1882 1883 1884 1885 1886 1887 1888 1889 1890 1891 1892 1893 1894 1895 1896 1897 1898 1899 1900 1901 1902 1903 1904 1905 1906 1907 1908 1909 1910 1911 1912 1913 1914 1915 1916 1917 1918 1919 1920 1921 1922 1923 1924 1925 1926 1927 1928 1929 1930 1931 1932 1933 1934 1935 1936 1937 1938 1939 1940 1941 1942 1943 1944 1945 1946 1947 1948 1949 1950 1951 1952 1953 1954 1955 1956 1957 1958 1959 1960 1961 1962 1963 1964 1965 1966 1967 1968 1969 1970 1971 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2008 2010 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2043 2044 2045 2046 2052 2053 205520562058 2059 2060 2061 2062 2063 2064 2065 2066 2068 2069 2070 2071 2073 2074 2075 2076 2077 2078 2079 2080 2082 2083 2084 2085 2086 2087 2088 2089 2090 2091 2092 2093 2094 2095 2096 2097 2098 2099 2100 2101 2102 2103 2104 2106 2107 2110 2111 2112 2113 2115 2116 2117 2118 2119 2120 2122 2124 2125 2126 2127 2128 2129 2130 2131 2132 2135 2136 2137 2138 2139 2140 2141 2142 2143 2144 2145 2146 2147 2148 2149 2150 2151 2152 2153 2154 2155 2156 2157 2158 2161 2162 2163 2164 2165 2166 2167 2168 2169 2170 2171 2172 2173 2175 2177 2178 2179 2183 2185 2186 2187 2188 2189 2190 2191 2193 21952196 2198 2199 2200 2201 2202 2203 2204 2205 2206 2207 2208 2209 2210 2211 2212 2213 2214 2216 221822202222 2223 2224 2225 2226 2227 2228 2229 2230 2231 2233 2234 2235 2236 22372239224122432245 2246 2247 2250 2251 2252 2253 2254 2255 2256 22572258 2260226222642266 2267 2268 2269 2270 2271 2272 2273 2275 2276 2277 2278 2279 2280 2281 2282 2283 2284 2285 2286 2287 2288 2289 2290 2291 2292 2293 2294 2295 2296 2297 2298 2299 2300 2301 2302 2303 2304 2307 2308 2310 2311 2312 2313 2314 2315 2316 2317 2318 2319 23202321 2322 2323 2324 2325 2326 2327 2328 2329 2330 2331 2332 2333 2334 2335 2336 2337 2338 2340 2342 2344 2345 2346 2347 2348 2349 23502351 2352 23532354 23552356 23572358 2359 2360 2361 2362 2363 2364 2366 2367 2369 2371 2372 2375 2376 2378 2379 2382 2383 2386 2387 2388 2390 2391 2393 2396 2397 2398 2399 2400 2401 2402 2403 2404 2405 24062407 2408 2409 2410 2411 2412 2413 2414 2415 2416 2417 2418 2419 2420 2421 2422 2423 2424 2425 2426 2427 2428 2429 2430 2431 2432 2433 2434 2435 2436 2437 2438 2439 2440 2441 2443 2444 2449 2450 24522454 2456 2457 2458 2459 2460 2461 2462 2463 2464 2465 2466 2467 2468 2469 2470 2471 2472 2473 2474 2475 2476 24802487 2488 2491 2492 24942495 2497 2499 2500 2501 25082509 2511 2514 2516 2517 2519 2520 2521 2523 2526 2528 2531 2533 2534 2536 2537 2539 2540 2541 2542 2543 2544 2545 2546 2547 2548 2549 2550 25512552 25542555 2557 2558 25602562 2564 2565 2567 2569 2570 2572 2573 2576 2577 2578 2579 2580 2581 2583 2584 2586 2587 2588 25892590 2591 2592 2593 2600 2601 2602 2603 2604 2605 2606 2607 2608 2609 2610 2611 2612 2613 2614 2615 2616 2617 2618 2619 2620 2621 26222623 2624 2625 2626 2627 2628 2629 2630 263126322633 2634 2635 2636 2637 2638 2639 2640 2641 2642 2643 2644 2645 2646 2647 2648 2649 2650 2651 2652 2653 2654 2655 2656 2657 2658 2659 266026622663 2664 2665 266626672668 2669 267026712672 2673 2674 2675 2676 2677 2678 2679 2680 2681 2682 2683 2684 2685 2686 268726882689 2690 2691 2692 2693 2694 2695 2699 2702 2703 2704 2706 2707 2708 2709 2711 2712 2714 2716 2717 2719 2720 2721 2722 2723 2724 2725 2726 2727 2730 27342735 2738 2739 2741 2742 2743 27472748 2749 2750 2751 2752 2754 2756 2757 2759 2761276327642765 2767 2768 2769 2770 2771 2772 2773 2774 2775 2776 2777 2779 2781 2782 2783 2785 2786 2787 2788 2789 2792 2794 2796 27972799 2801 2802 2803 2804 2805 2806 2807 2808 2809 2810 2811 2812 2815 2817 2818 2819 2820 2821 2824 2825 2826 2830 2831 2832 2833 2834 2837 2838 2839 2840 2841 2842 2843 2844 284728482849 2850 28602861 2862 2863 286428652867 2875 28762878 2879 2882 2883 2884 2885 2886 2887 2889 2890 2891 2892 2895 2896 2897 2898 2902 2903 2906 2907 2908 2909 2910 2912 2913 2915 2918 2921 2922 2932 2933 2934 2935 2936 2937 2938 2939 2940 2941 2943 2944 2945 2946 2947 2948 2949 2951 2952 2953 2954 2955 2956 2957 2958 2959 2960 2961 2962 2963 2964 2965 2966 2968 2969 2970 2971 2975 2976 2978 2979 2980 2981 2982 2983 2984 2986 2989 2990 2992 29932994 2995 2996 2997 2998 2999 3000 3001 3002 3003 3004 3005 3006 3007 3008 30093010 3011 30123014 30153016 30173019 3021 3022 3023 3024 3025 3026 3027 3028 3030 3031 3032 3033 3034 3035 3036 3037 3038 3039 3040 3042 30433044 3045 3046 3047 3048 3049 3050 3051 3052 3053 3054 30553056 3057 3058 3059 3060 3061 3062 3063 3064 3065 3066 3070 3071 3072 3073 3074 3075 3076 3077 3078 3079 3080 3081 3082 3083 3084 3085 3086 3087 3088 3089 3090 30913092 3093 3094 3095 3096 3097 3098 3099 3100 3101 3102 3103 3104 3105 3106 3107 3108 3109 3110 31113112 3113 3114 3115 3116 3117 3118 3119 3120 3121 3122 3123 3124 3125 3126 3128 3130 3131 3132 3133 3134 31363137 3138 31393140 3141 3142 3143 3144 3145 3146 3147 3148 3149 3150 3151 3152 3153 3154 3155 3156 3157 3158 3159 3160 3161 3164 3165 31663167 3168 3169 3170 3171 3172 3173 3174 3175 3176 31773178 3179 3180 3181 3182 3183 3184 3185 3186 3187 3188 3189 3190 3191 3192 3193 3194 3197 3198 3199 3200 3201 3202 3203 3204 3205 3206 3207 3208 3209 3210 3211 3212 3213 3214 3215 3216 3217 3218 3219 3222 3223 3224 3225 3226 3227 3228 3229 3230 3231 3232 3233 3234 3235 3237 3239 3240 3241 3242 3243 3244 3245 3246 3247 3248 3249 3250 3251 3252 3253 3254 3255 3257 3260 3261 3265 3266 32693270 3271 3272 3273 3274 3275 327732783279 3280 3281 328232833285 3286 32883289 3290 3291 3292 3293 3294 3295 3296 3297 3298 3299 3300 3301 3302 3303 3304 3305 3306 3307 3308 3309 3310 3311 3312 3313 3314 33153316 3317 3318 3319 3321 3323 3324 3325 3328 3329 3330 33313332 3333 3334 3335 3337 3342 3343 3344 3345 3346 3347 3348 3349 3350 3351 3352 3353 3354 3356 3357 3358 3359 3360 3361 3362 3363 3364 3365 3366 3367 3368 3370 3371 3372 3373 3374 3375 3377 3379 3380 3381 3382 3383 3385 3386 3387 3388 3389 3390 3391 3392 3393 3394 3395 3396 3397 3398 3399 34003401 3402 3403 3404 3405 3406 3407 3408 3409 3410 3411 3412 3413 3414 3415 3416 3417 3418 3419 3420 3421 3422 3423 3424 3425 3426 3427 3428 3429 3430 3431 3432 3433 3434 3435 3436 3437 3438 3439 3440 3441 3442 3443 3444 3445 3446 3447 3448 3449 34503451 3452 3453 3454 3455 3456 3457 3458 3459 3460 3461 3462 3463 3464 3465 3466 3467 3468 3469 3470 3471 3472 3473 3474 3475 3476 3477 3478 3479 3480 3481 3482 3483 3484 3485 3486 3487 3488 3489 3490 3491 3492 3493 34943495 3496 3497 3498 3499 3500 3501 35023503 35043505 35063507 3508 3509 3510 3511 3512 3513 3514 3515 3516 3517 3518 3519 35203521 3522 3523 3524 3525 3526 3527 3528 3529 3530 3531 3532 3533 3534 3535 3536 3537 3538 3539 3540 3541 3542 3543 3544 3545 3546 3547 3548 3549 3550 3551 3552 3553 3554 3555 3556 3557 3619 3620 3622 3623 3624 3625 3626 3627 3628 3629 3630 3631 3632 36333634 3635 3637 3638 3639 36403641 3642 3643 3644 3649 3650 3651 3652 3653 3654 3655 3656 3657 3658 3659 3660 3661 3662 3663 3664 3665 3666 3667 3668 3669 3670 3671 4662 4663 46644665 4666North Wolfe RoadBuildingVisitor Center North Wolfe RoadParking StructureVisitor CenterE Homestead Rd 25 STOPSTOPSTOPSTOPST OP STOP25 BIKELANEBIKELANEBIKELANEBIKELANEONLYONLYONLYONLYONLY ONLYONLYONLYONLYONLYONLYONLYONLY ONLYONLYONLYONLYONLYONLYBIKELANEBIKELANEBIKE LANE BIKELANEBIKELANEBIKELANEBIKELANEBIKELANEBIKELANEONLYONLY ONLYONLY ONLYONLYONLYONLYONLY STOPXONLYONLYPARKINGNOPARKINGNOPARKINGNOPARKINGNO X XX X X X X X ONLYDNRAMPNorth Tantau AvenueNorth Tantau AvenueNorth Tantau AvenueNorth Tantau AvenueNorth Wolfe RoadNorth Wolfe RoadNorth Wolfe RoadEast Homestead Road East Homestead Road East Homestead Road East Homestead Road P run eridg e A v enu ePrun eridg e Avenu e Pruneridge AvenueNightingale RoadPeacock AvenueQuail AvenueAvenueNorth Tantau East Homestead Road East Homestead Road North Wolfe RoadNorth Wolfe RoadEast Homestead Road 1824 1836 1721 1720 2934 1439 1438 3016 2805 1302 1300 1212 1408 1023 1024 1027 1034 1038 1039 1040 1043 1045 1046 1098 1100 1112 1118 1459 1460 1461 1471 1478 1480 1509 1510 1511 1512 1513 1846 2042 2048 2050 2051 285428552856 2857 2858 2868 28692870 2871 2872 2873 2880 2881 2899 29002901 2904 2916 2917 2919 2923 2924 2926 2927 2928 3067 3068 3069 3195 3196 3621 5506 5505 5502 5500 5499 5498 5497 5495 5494 5493 5492 5490 5489 5488 5486 5485 5484 5482 5481 5479 5478 5477 5475 54745473 5471 5470 5469 5468 5466 5465 5464 5462 5461 5459 5458 5457 5455 5454 5453 5451 5450 5448 5447 5446 5445 5444 5443 5442 5441 5440 5439 5435 5434 5433 5432 5431 5430 5427 54255424 5422 5421 5419 5418 5417 5416 5414 5413 5411 5410 54085407 5406 5405 5403 5400 5398 5396 5394 5393 5392 5391 5390 5389 5388 5387 5386 5385 5384 5383 5382 5381 5380 5379 5378 5377 5376 5375 5374 5373 5372 5371 5370 5369 5368 5353 5352 5351 5350 5349 5348 5347 5346 5345 5344 5343 5342 5341 5340 5339 5338 5337 5336 5335 5334 5333 5332 5331 5330 5329 5328 5327 5326 5325 5324 5323 5322 5321 5320 5319 5318 5317 5316 5315 5314 5313 5312 5311 5310 5309 5308 5307 5306 5305 5304 5303 5302 5301 5300 5299 5298 5297 5296 5295 5294 5293 5292 5291 5290 5289 5288 5287 5286 5285 5284 5282 5281 5279 5278 5276 5275 5274 3665 3664 3663 3662 3661 3660 3659 3658 3657 3656 3655 3654 3653 3652 3651 3650 3649 3620 3561 3501 3486 3484 3482 3480 3478 3477 3476 3475 3474 3473 3472 3471 3470 3469 3468 3467 34663465 34643463 34623461 3460 3459 3458 3457 3456 3454 3452 3450 3449 3448 3447 3445 3424 3423 3419 3418 3417 3416 3415 3414 3413 3412 3411 3410 3407 3406 3404 3402 3399 3398 33973396 3395 3394 3369 3368 3367 3321 3320 3319 3318 3310 3309 3308 3124 3123 3109 3107 3105 3103 3101 3099 3097 3096 3095 3094 3093 3092 3091 3090 3089 3088 30873086 3085 3084 3083 3082 3081 3080 3079 3078 3077 3076 3075 3074 3073 3072 3071 3070 3065 3064 3063 3062 3061 3059 3053 3052 3051 3050 3049 3047 3046 3041 3039 3038 3037 3036 3035 3034 3033 3032 3027 3026 3025 3024 3023 3022 3021 3020 3019 3018 3017 3015 3014 3013 3012 3011 3010 3004 3003 3002 3001 3000 2999 2998 2997 2996 2995 2994 2992 2987 2983 2977 2974 2719 1148 3057 3045 2092 3031 3029 3028 3008 3009 3007 3006 3005 2957 2956 2955 2953 2952 1151 27181152 4665 4664 4663 2988 3560 3559 3558 3451 3455 3481 3497 3496 3499 3405 3400 34013403 5501 5503 5504 5496 5491 5487 5483 5480 5472 5476 5467 5463 5456 5460 5452 5449 5438 5437 5436 5428 5429 5426 5423 5420 5415 5412 5409 5404 5401 5402 5397 5399 5395 2273 2274 2275 1332 1413 14141437 1436 2935 2936 1854 1825 1823 1837 3125 1722 2879 2146 2214 2230 1210 1153 35523551 1091 3173 1425 1424 1423 1325 2821 2766 2761 2760 3495 3494 3492 3498 3500 3488 3487 3479 3453 3324 3322 11491150 2954 3425 3426 3427 3428 3429 3430 3431 3432 4333 3434 4355 31753174 3176 3139 3141 3060 3058 3048 3040 3054 1154 3439 3440 3441 34423436 3437 3438 3443 3446 2762 2993 1084 2771 2809 2808 2807 2806 2145 2147 2991 #### #### #### Legend #### #### #### #### #### Standard Trees to Remain 740 Trees Specimen Trees to Remain 01 Trees Standard Trees to be Transplanted 73 Trees Specimen Trees to be Transplanted 18 Trees Standard Trees to Be Removed 3,625 Trees Specimen Trees to Be Removed 49 Trees Total Existing Trees 4,506 Trees Total Existing Trees to be Removed 3,674 Trees Summary AC2 Overall Project Tree Quantity Total 614 Trees 0 Trees 68 Trees 17 Trees 3,280 Trees 49 Trees 4,030 Trees 3,329 Trees 0 Trees 0 Trees 0 Trees 0 Trees Quantity Site B Phase 2 - 0 Trees 69 Trees 69 Trees 69 Trees 1 Trees 0 Trees Quantity Site C+D Phase 2 - 126 Trees 276 Trees 407 Trees 276 Trees 0 Trees 0 Trees 0 Trees 0 Trees Quantity Site A Phase 1 - 47 Trees 58 Trees 58 Trees Site A) (including Quantity Phase 1 105 Trees Per EIR - October 2013 Existing Specimen Tree To Remain Per EIR - October 2013 Existing Specimen Tree To Be Removed Per EIR - October 2013 Existing Specimen Tree To Be Transplanted Per EIR - October 2013 Existing Standard Tree To Remain Per EIR - October 2013 Existing Standard Tree to be Transplanted Per EIR - October 2013 Existing Standard Tree To Be Removed Per Current Design - September 2017 Existing Standard/Specimen Tree To Remain Per Current Design - September 2017 Existing Standard/Specimen Tree to be Transplanted Per Current Design - September 2017 Existing Standard/Specimen Tree To Be Removed 1 Trees 5 Trees 1" = 40'-0"2193 N Title Project No. Date Scale at Arch E1 Number Revision Apple Inc. Phase 2 Apple Park Tantau 14 Building PLANNING APPLICATION 00 01/31/2018 F+PPlanning - Site & Architectural Review 00 01/31/2018 © Foster + Partners 2017 N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street N. Tantau AvenuePruneridge Avenue Tree Disposition Plan - South 1":100' (1:1200)01 P-TA14-4.16 South (Sheet 2 of 2) Tree Disposition Plan 2636 2637 2638 2639 2640 2641 2642 2643 2644 2645 2646 2647 2648 2649 2650 2651 2653 2656 2658 2659 266026622663 2664 2665 266626672668 2669 267026712672 2673 2674 2691 2693 2702 3232 3234 3235 3237 3239 3240 3241 3242 3243 3244 3245 3246 3247 3248 3249 3250 3251 3252 3253 3254 3255 3257 3260 3261 3265 3266 32693270 3271 3272 3273 3274 3275 327732783279 3290 3291 3292 3293 3294 3295 3296 3297 3300 3301 3410 3411 3412 3413 3414 3415 3416 3417 3418 3419 3420 3421 3422 3423 3424 3499 350035063507 3550 3551 3552 3553 3554 3555 3556 3557 3566 35733574 35773578 3585 3586 3594 3595 3606 3607 3608 3609 3610 3611 3612 3613 3614 3615 3616 3617 3618 3627 3628 3629 3630 3631 3632 36333634 3635 3636 3637 3638 3639 36403641 3642 3643 3644 36453646 3647 3648 3649 3650 3651 3652 3653 3654 3655 3665 3666 3667 3668 3669 3672 3673 3674 3675 3676 3677 3678 3679 3680 3681 3682 3683 3684 3685 3686 3687 3688 3689 3690 3691 3692 3693 3694 3695 3696 3697 3698 3699 3700 3701 3702 3703 3704 3706 3709 3711 3712 3713 3714 3715 3716 37173718 3719 3720 37213722 37233724 37253726 37273728 37293730 37313732 37333734 37353736 37373738 37393740 3741 3742 3743 3744 3745 3746 37473748 3749 3750 3751 3752 3753 3754 37553756 3757 3758 37593760 37613762 3764 3765 3766 3767 3768 3769 3770 3771 3772 3773 3774 3775 3776 3777 3778 3779 3780 3781 3782 3783 3784 3785 3786 3787 3788 3789 3790 3791 3792 3793 3794 3795 3796 3797 3798 3799 3800 3801 3802 3803 3804 3805 3806 3807 3808 3809 3810 3811 3812 3813 3814 3815 3816 3817 3818 3819 3820 3821 3822 3823 3824 3825 3826 3827 3828 3829 3830 3831 3832 3833 3834 3835 3836 3837 3838 3839 3840 3841 3842 3843 3844 3845 3846 3847 3848 3849 3850 3851 3852 3853 3854 3855 3856 3857 3858 3859 3860 3861 3862 3863 3864 3865 3866 3867 3868 3871 3872 3873 3874 3875 3876 3877 3878 3879 3880 3881 3882 3883 3884 3885 3886 3887 3888 3889 3890 3891 3892 3893 3894 3895 3896 3897 3898 3899 3900 3901 3902 3903 3904 3905 3906390739083909 3910 3911 3912 3913 3914 3915 3916 3917 3918 3919 3920 3921 3922 3923 3924 3925 3926 3927 3928 3929 3930 3931 3932 3933 3934 39353936 3937 3938 3939 3940 3941 3942 3943 3944 3945 3946 3947 3948 3949 3950 3951 3952 3953 3954 3955 3956 3957 39583959 3960 3961 3962 3963 3964 3965 3966 3967 3968 3969 3970 3971 3972 3973 39743975 3976 3977 3978 3979 3980 3981 3982 3983 3984 3985 3986 3987 3988 3989 3990 3991 3992 3993 3994 3995 3996 3997 3998 3999 4000 4001 4002 4003 4004 4005 4006 4007 4008 4009 4010 40114012 4014 4018 4019 4020 4021 4022 4023 4024 4025 4026 4027 4028 4029 4030 4031 4032 4033 4034 4035 4036 4037 4038 40394040 4041 4042 4043 4044 4045 4046 4047 4048 4049 4050 4051 4052 4053 4054 4055 4056 4057 4058 4059 4060 4061 4062 4063 40644065 4066 40674068 4069 4070 4071 4072 4073 4074 4075 4076 4077 4078 4079 4080 4081 4082 4083 4084 4085 4086 4087 4088 4089 4090 4091 4092 4093 4094 4095 4096 4097 4098 4099 4100 4101 4102 4103 4104 4105 4106 4107 4108 4109 4110 4111 4112 4113 4114 4115 4116 4117 4118 4119 4120 4121 4122 4123 4124 4125 4126 4127 4128 4129 4130 4131 4132 4133 4134 4135 4136 4137 4138 4139 4140 4141 4142 4143 4144 4145 4146 4147 4148 4149 4150 4151 4153 4154 4155 4156 4157 4158 4159 4160 4161 4162 4163 4166 4168 4169 4170 4171 4172 4173 4174 4175 4176 4177 4178 4179 4180 4181 4182 4183 4184 4185 4186 4187 4188 4189 4190 4191 4192 4193 4194 4195 4196 4197 4198 4199 4200 4201 4202 4203 4204 4205 4206 4207 4208 4209 4210 4211 4212 4213 4214 4215 4216 4217 4218 4219 4220 4221 4222 4223 4224 4225 4226 4227 4228 4229 4230 4231 4232 4233 4234 4235 4236 4237 4238 4239 4240 4241 4242 4243 4244 4245 4246 4247 4248 4249 4250 4251 4252 4253 4254 4255 4256 4257 4258 4259 4260 4261 4262 4263 4264 4265 4266 4267 42684269 4270 4271 4272 4273 4274 4275 4276 4277 4278 4279 4280 4281 4282 4283 4284 4285 4286 4287 4291 4292 4293 4294 4295 4296 4297 4298 4299 4300 4301 4302 4303 4304 4305 4306 4307 4308 4309 4310 4311 4312 4313 4314 4315 4316 4317 4318 4319 4320 4321 4322 4323 4324 4325 4326 4327 4328 4329 4330 4331 4332 4333 4334 4335 4336 43374338 4339 4340 4341 4342 4343 4344 4345 4346 4347 4348 4349 4350 4351 4352 4353 4354 4355 4356 43574358 4359 4360 4361 4362 4363 4364 4365 4366 4367 4368 4369 4370 4371 4372 4373 4374 4375 4376 4377 4378 4379 4380 4381 4382 4383 4384 4385 4386 4387 4388 4389 4390 4391 4392 4393 4394 4396 4397 4398 4399 4400 4401 4402 4403 4404 4405 4406 4407 4408 4409 4410 4411 4412 4413 4414 4415 4416 4417 4418 4419 4420 4421 4422 4423 4424 4425 4426 4427 4428 4429 4430 4431 4432 4433 4434 4435 4436 4437 4438 4439 4440 4441 4442 4443 4444 4445 4446 4447 4448 4449 4450 4451 4452 4453 4454 4455 4456 4457 4458 4459 4460 4461 4462 4463 4464 4465 4466 4467 4468 4469 4470 4471 4472 4473 4474 4475 4476 4477 4478 4479 4480 4481 4482 4483 4484 4485 4486 4487 4488 4489 4490 4491 4492 4493 4494 4495 4496 4497 4498 4499 4500 4501 4502 4503 45044505 4506 4507 4508 4509 4510 4511 4512 4513 4514 4515 4516 4517 4518 4519 4520 4521 4522 4523 4524 4525 4526 4527 4528452945304531 4532 4533 453445354536 4537 4538 4539 4540 4541 4542 4543 4544 4545 4546 4547 4550 4551 4552 4553 4554 4555 4556 4557 4558 4559 4560 45614562 456345644565 45664567456845694570457145724573 4574 4575 4576 4577 4578 4579 4580 4581 4582 4583 4584 4585 4586 4587 4588 4589 4590 4591 4592 4593 4594 4595 4596 4597 4598 4599 4600 4601 4602 4603 4604 4605 4606 4607460846094610 4611 4612 4613461446154616461746184619 4620 4621 4622 4623 4624 4625 4626 4627 4628 4629 4630 4631 46324633 4634 4635 4636 4637 4638 4639 4640 4641 4642 4643 4644 4645 4646 4647 4648 4649 4650 4651 4652 4653 4654 4655 4656 4657 4658 4659 4660 4661 4662 4663 46644665 4666 4667 4668 4669 4670 4671 4672 4673 4674 4675 4676 4677 4678 4679 4680 4681 4682 4683 4684 4685 4686 4687 4688 4689 4690 4691 4692 4693 46944695 4696 4697 4698 46994700 4701 4702 47034704 4705 4706 4707 4708 4709 4710 4711 4713 4714 4715 4716 4717 4718 4719 4720 4721 4722 4723 4724 4725 4726 4727 4728 4729 4730 4731 4732 4733 4734 4735 4736 4737 4738 4739 4740 4741 47424743 4744 4745 4746 4747 4748 4749 4750 4751 4752 4753 4754 4755 4756 47574758 47594760 4761 47624766 4767 4768 4769 4770 4771 477247734774 4775 4776 4778 4782 4783 4784 4785 4786 4787 4788 4789 4790 4791 4792 4793 4794 4795 4796 4797 4798 4799 4800 4801 4802 4803 4804 4805 4806 4807 4808 4809 4810 4811 4812 4813 4814 4815 4816 4817 4818 4819 4820 4821 4822 4823 4824 4825 4826 4827 4829 4830 4831 4832 4833 4834 4835 4836 4837 48384839 4840 4841 4842 4843 4844 4845 4846 484748484850 4851 48544855 4856 4857 4859 48604861 4862 4863 4864 4865 4866 4867 4868 4869 4870 4871 4872 48744875 4876 4880 4881 4882 4883 4884 4885 4886 4887 4890 4891 4892 4893 4894 4895 4896 4897 4898 4899 4900 4901 4902 4903 4904 4905 4906 4907 4908 4909 4910 4911 4912 4913 4914 4915 4916 4917 4918 4919 4920 4921 4922 4923 4924 4925 4926 4927 4928 4929 4930 4931 4932 4933 4934 4935 4936 4937 4938 4939 4940 4941 4942 4943 4944 4945 4946 4947 4948 4949 4950 4951 4952 4953 4954 4955 4956 4957 4958 4959 4960 4961 4962 4963 4964 4965 4966 4967 4968 4969 4970 4971 4972 4973 4974 4975 4976 4977 4978 4979 4980 4981 4982 4983 4984 4985 4986 4987 4988 4989 4990 4991 4992 4993 4994 4995 4996 4997 4998 4999 5000 5001 5002 5003 5004 5005 5006 5007 5008 5010 5011 5013 5015 5016 5017 5018 5019 50205021 5022 5023 5024 5025 5026 5027 5028 5029 5030 5031 5032 5033 5034 5035 5036 50375038 5039 5040 5041 5042 5043 5044 5045 5046 5047 5048 5049 5050 5051 5052 5053 5054 5055 5056 5057 5058 5059 5060 5061 5062 5063 5064 5065 5066 5067 5068 5069 5070 5071 5072 5073 5074 5075 5076 5077 5078 5079 5080 5081 5082 5083 5084 5085 5086 5087 5088 5089 5090 5091 5092 5093 5094 5095 5096 5097 5098 5099 5100 5101 5102 5103 5104 5105 5106 5107 5108 5109 5110 5111 5112 5114 5116 51175118 5119 5120 5121 5122 5123 5124 5125 5126 5127 5128 5129 5130 5131 5132 5133 5134 5135 5136 5137 5138 5139 5140 5141 5142 5143 5144 5145 5146 5147 5148 5149 5150 5151 5152 5153 5156 515751585159 5160 5161 5162 5163 5166 5169 5171 5172 5173 5174 5175 5176 5177 5178 5179 5180 5181 5182 5183 5184 51855186 5187 5188 5189 5190 5191 5192 5193 5194 5195 5196 5197 5198 5199 5200 5201 5202 5203 5204 52055206 5207 5208 5209 5210 5211 5212 5213 5214 5215 5216 5217 5218 5219 5220 5221 5222 5223 5224 5225 5226 5227 5228 5229 5230 5231 5232 5233 5234 5235 523652375238 5239 52405241 5242 5243 5244 5245 5246 5247 5248 5249 5250 5252 5253 5255 5256 5258 5259 5260 5261 5262 5263 5264 5265 5266 5267 5268 5269 5270 5271 5272 5273 Tantau 11 South R&D - +168.9+169.20+179.64(R16)(R18) 2% +189.00 4% +188.90 +188.90+188.802% 5% 4%EVEVEVCPCPCPCPCPCPCPCPVANCompactor Compactor Compactor grease box switch gear transformer 4" pad switch gear 4" pad35353535 ONLY ONLY ONLY ONLYONLY ONLY ONLY ONLYONLY ONLYONLYONLYONLY EVEVDNCLCLCLCLXX X X X X X X X X XX X X X +176'-06''upup+155'-7 1/2"+141'-6''+141'-6''+155'-7 1/2"+156'-7 1/2"GE NE R AT ORBACKUP DIES E L GE NE R AT ORBACKUP DIES E L (F UT URE)GE NE R AT ORBACKUP DIES E L DIESEL ST OR AGE T ANKAB OVE GROUNDDIESEL S T ORAGE T ANKAB OVE GR OUND36'-6" "1614'-0 6'-0" "814'-9 "16 13 417'-5 "856'-7 9'-2" "16150'-2 "16 99'-0 "16150'-2 "16 99'-0 "16150'-2 "16 11 13'-10 "16158'-5 "16 914'-3 28'-7" 4'-0" 3" 16'-1" 8'-0" "1619APP004.25AOM4.21AOM4.22AOM4.23AOM4.24AOM4.25APP004.11AOM 4.11 AOM 4.12 AOM 4.13 AOM 4.14AOM 4.15W DM14/15WDM 12/13 W DM11/21APP004.24APP004.23APP004 .22APP004.21APP004.14APP004.12APP004.13 EDM2EDM1 TELE 1TELE2 TELE CW DM 22/23 WD M24/25APP004 .15APP004.35AOM4.31AOM4.32AOM4.33AO M4.34AOM4.35A PP004.41AOM4.41AOM4.42AOM4.43AOM4.44AOM4.45WDM44/45WDM42/43WDM31/41APP004.34APP004.33APP004.32APP004.31APP004.44APP004.42APP004.43W DM 32/33 WD M34/35APP004.45EDM4EDM3TEL E3 TE LE4 8'-3" 7'-6" 4'-8" 9'-5" 4'-8" 9'-5" 5'-6" 9'-5" 4'-8" 9'-5" 4'-8" 9'-5" 4'-8" 9'-5" 4'-8" 9'-5" 7'-6" 7'-6" 6'-7" 5'-10" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 5' 5' 3' 5'-10" 3' 5'-10" 3' 4' 4' 4' 4' 29'-2" 29'-2" 29'-2" 29'-2" 5' 5' 5' 5' 5' 8' 17'-1" 4'-1" 1'-1" 8' 4'-8" 29'-2" 29'-2" 29'-2" 29'-2" 4' 4' 4' 4' 4' 5' 5' 5'-10" 6'-7" 3' 3'-10" 6'-7" 6'-3" 6'-3" 6'-3" 6'-3" 6'-7" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 0" 6'-3" 6'-3" 6'-3" 5'-10" 3' 5'-10" 8'-3" 6'-3" 5' 4'-3" 4'-3" 8' 8'-6" 8' 4'-3" 4'-3" 10' 9'-6" 8'-6" 8' 8'-6" 8' 4'-3" 4'-3" 5' 9' 4'-8" 4'-9" 9' 5' 4'-3"4'-3" 8' 8'-6" 8' 8'-6" 9'-6" 8' 8'-6" 8' 8'-6" 8' 4'-3" 4'-3" 4'-11" 9'-5" 4'-8" 9'-5" 4'-8" 3' 4'-1" 10'-5" 10'-5" 4'-5" 4'-5" 4'-3" 6'-7" 7' 2'-2"3'-1" 4'1' 3' 3' 4' 29'-2" 4' 4' 4' 4' 4' 4' 8' 17'-1" 4'-1" 1'-1" 8'4'-8" 4' 4' 4' 4' 4' 29'-2" 4'-1" 3' 8' 8' 6'-3" 3' 7' 2'-2" 4'4'1' 3'-1" 3'3'3'CPCPCPCPCPEVCPEVEVRSVEVEVRSVVISRSVVISRSVVISRSVVISRSVVISRSVVISRSVVISRSVVISRSVVISRSVVISRSVRSVEVRSVEVRSVEVRSVVISRSVVISRSVVISRSVVISEV DNNorth Tantau AvenueNorth Tantau AvenueNorth Tantau AvenueNorth Tantau AvenueNorth Tantau AvenuePruneridge Avenue I-28 0 N B O ff-R am p I-28 0 I-28 0North Wolfe RoadNorth Tantau AvenueOffice Building - Tantau 9 Office Building - Tantau 9 Office Building - Tantau 9 Parking Structure - Tantau 10 Parking Structure Tantau 14 Mar-Comm Building Tantau 14 Mar-Comm Building Tantau 14 Tantau 11 South R&D - Tantau 11 South R&D - Tantau 12 North R&D - Tantau 12 North R&D - 6'107.510EVEVEVCPEVEVVANCPCPEVRSVVISCalabazas Creek Calabazas Creek Calabazas CreekCalabazas Creek4015 4016 4017 4828 5273 5212 5211 5204 5203 5202 5201 5200 5199 5198 5197 5196 5195 5193 5192 5191 5190 5189 5188 5187 5186 5185 5184 5183 5182 5181 5180 5179 5178 5177 5176 5175 5174 5171 5170 5169 5153 5152 5151 5150 5149 5148 5147 5146 5145 5144 5143 5142 5141 5140 5139 5138 5137 5136 5135 5134 5133 5132 5131 5130 5129 5128 5127 5126 5118 5117 5116 5115 5114 5113 5112 5111 5110 5109 5108 5107 5106 5105 5104 5103 5102 5101 5100 5099 5098 5097 5096 5095 5094 5093 5092 5091 5090 5089 5088 5087 5086 5085 5084 5083 5082 5081 5080 5079 5078 5077 5076 5075 5074 5073 5072 5071 5070 5069 5068 5067 5066 5065 5064 5063 5062 5061 5060 5059 5058 5057 5056 5055 5054 5050 5049 5048 4953 4952 4951 4950 4949 4948 4947 4946 4945 4939 4938 4936 4935 4934 4933 4932 4931 4930 4929 4928 4927 4926 49254924 49234922 4920 4918 49174916 4915 4914 4913 4756 4732 4731 4730 4729 4726 4281 4280 4279 4278 4277 4276 4275 4274 4271 4270 4268 4267 4266 4265 4264 4263 4262 4261 4259 4258 4257 4256 4255 4254 4253 4252 4246 4244 42434242 4241 4240 4237 4236 4235 4234 4233 4226 4225 4224 4223 4222 4221 4220 4218 4217 4216 4215 4214 4212 4211 4210 4209 4204 4203 4202 4201 4194 4193 4192 4191 4190 4188 4187 4186 4185 4183 4073 4072 4071 4070 4069 4065 4063 4062 4060 4056 4055 4054 4048 4047 4046 3782 3781 3780 3779 3778 3777 3776 3775 3774 3773 3772 3771 3770 3769 3768 3767 3764 3763 3762 3761 3760 3759 3758 3757 3756 3754 3753 3752 3751 3750 3749 3748 3747 3746 3745 3744 37433742 3741 3740 3739 3738 3737 3736 3735 3734 3733 3732 3731 3730 3729 3728 3727 3725 3724 3723 3722 3721 3720 3714 3713 3712 3711 3710 3709 3707 3665 3655 3654 3653 3652 3651 3650 3649 3648 3647 3646 3605 3601 3596 3589 3587 3584 3582 3576 3561 3424 3423 3419 3418 3417 3416 3415 3414 3413 3412 3411 3410 4944 4942 4941 4940 4834 4839 4665 4664 4663 3604 3603 3602 3600 3599 3598 3597 3593 3592 3591 3590 3588 3583 3581 3580 3579 3575 3572 3571 3570 3569 3568 3567 3565 3564 3563 3562 3560 3559 3558 466046854676 4704 4692 5260 4245 4272 4273 35523551 4551 4659 5051 4250 4249 4248 4247 4200 4199 4198 3726 3755 3944 3945 3946 45063902 3927 3926 3990 3672 3784 3708 5122 5123 5235 5234 5233 5232 5231 5228 5227 5263 4205 4213 4789 4801 3904 5173 5172 5262 5214 5216 #### #### #### Legend #### #### #### #### #### Standard Trees to Remain 740 Trees Specimen Trees to Remain 01 Trees Standard Trees to be Transplanted 73 Trees Specimen Trees to be Transplanted 18 Trees Standard Trees to Be Removed 3,625 Trees Specimen Trees to Be Removed 49 Trees Total Existing Trees 4,506 Trees Total Existing Trees to be Removed 3,674 Trees Summary AC2 Overall Project Tree Quantity Total 614 Trees 0 Trees 68 Trees 17 Trees 3,280 Trees 49 Trees 4,030 Trees 3,329 Trees 0 Trees 0 Trees 0 Trees 0 Trees Quantity Site B Phase 2 - 0 Trees 69 Trees 69 Trees 69 Trees 1 Trees 0 Trees Quantity Site C+D Phase 2 - 126 Trees 276 Trees 407 Trees 276 Trees 0 Trees 0 Trees 0 Trees 0 Trees Quantity Site A Phase 1 - 47 Trees 58 Trees 58 Trees Site A) (including Quantity Phase 1 105 Trees Per EIR - October 2013 Existing Specimen Tree To Remain Per EIR - October 2013 Existing Specimen Tree To Be Removed Per EIR - October 2013 Existing Specimen Tree To Be Transplanted Per EIR - October 2013 Existing Standard Tree To Remain Per EIR - October 2013 Existing Standard Tree to be Transplanted Per EIR - October 2013 Existing Standard Tree To Be Removed 46 Trees Per Current Design - September 2017 Existing Standard/Specimen Tree To Remain Per Current Design - September 2017 Existing Standard/Specimen Tree to be Transplanted Per Current Design - September 2017 Existing Standard/Specimen Tree To Be Removed 1 Trees 5 Trees 1" = 40'-0"2193 N Title Project No. Date Scale at Arch E1 Number Revision Apple Inc. Phase 2 Apple Park Tantau 14 Building PLANNING APPLICATION 00 01/31/2018 F+PPlanning - Site & Architectural Review 00 01/31/2018 © Foster + Partners 2017 N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street N. Tantau AvenuePruneridge Avenue LEGENDFFAEDCALABAZAS CREEK CORR IDOR 1" = 40'-0"Tantau 14 BuildingApple ParkPhase 201/31/20181738TANTAU 14 TREESExisting Trees to be Removed: 43Proposed Trees:2500 40'20'80'PARKING AIR INTAKE,SEE ARCH DWGS.STAIRWELL,SEE ARCH DWGS.STAIRWELL,SEE ARCH DWGS.RAMP TO BELOW GRADE PARKING.(8) BIKE PARKING, DTL1/L8.02.(1) ASH URN.CALABAZAS CREEK TRAILSIGN, SEE CREEK TRAILPACKAGE.00Apple Inc.Tantau 14 BuildingApple ParkPhase 201/31/2018PLANNING APPLICATION 1" = 40'-0"0100 01/31/2018 Planning - Site & Architectural ReviewF+P© Foster + Partners 2017NNClientProjectTitleProject No. DateScale at Arch E1NumberKey Plan.General Notes1.2.3.4.5.6.Do not scale drawings. Dimensions govern.All dimensions are in feet and inches unless noted otherwise.All levels are in feet and inches unless noted otherwise.All dimensions shall be verified on site before proceeding with the work.Foster + Partners shall be notified in writing of any discrepancies.Any areas indicated on this sheet are approximate and indicative only.Rev. DateReason For IssueChkRevisionSuite 240San Francisco, CA 94111www.fosterandpartners.comT 408 610 5800OLINLuk and AssociatesPhiladephia, PA 19106T 215 440 0030 / Fax 215 440 0041OLIN Partnership. Ltdwww.theolinstudion.com738 Alfred Nobel DriveHercules, CA 94547www.lukassociates.comT 510 724 3388150 South Independence Mall WestPublic Ledger Building, Suite 1123LANDSCAPE ARCHITECTURE AND URBAN DESIGN1000 Samsome StreetN. Tantau Avenue Pruneridge AvenueAll dimensions shall be verified on site before proceedingwith the work.OLIN shall be notified in writing of any discrepancies.Do not scale drawings. Dimensions govern.1.2.3.4.General Notes5. Any areas indicated on this sheet are approximate andindicative only.All dimensions are in feet and inches unless noted otherwise.P-TA14-X.XX2193Sheet NameDrawing NamePlanning - Site & Architectural ReviewP-TA-14-4.20Landscape PlanLandscape PlanDBPARKING STRUCTUREBELOW, SEE ARCH DWGS.FOR CALABAZAS CREEKTRAIL MARKERS, SEECREEK TRAIL PACKAGE.FOR CALABAZAS CREEKTRAIL, SEE CREEK TRAILPACKAGE.SWALE / STORMWATERAREA, TYP..EXISTING CMURESIDENTIAL WALLTO REMAIN.WASTE COMPACTORS,SEE ARCH DWGS. FFAED15' Front Setback25' Interior Side Setback 150' Interior Side Setback From Residential (Buildings Taller Than 16')50 ' C r e e k Se t b a c k 15' Street Side Setback 15' Street Side Setback Public Utility Easement Public Utility Easement CALABAZAS CREEK CORR IDOR 1" = 40'-0"Tantau 14 BuildingApple ParkPhase 201/31/201817381SITE PLAN1" = 40'-0"0 40'20'80'00Apple Inc.Tantau 14 BuildingApple ParkPhase 201/31/2018PLANNING APPLICATION 1" = 40'-0"0100 01/31/2018 Planning - Site & Architectural ReviewF+P© Foster + Partners 2017NNClientProjectTitleProject No. DateScale at Arch E1NumberKey Plan.General Notes1.2.3.4.5.6.Do not scale drawings. Dimensions govern.All dimensions are in feet and inches unless noted otherwise.All levels are in feet and inches unless noted otherwise.All dimensions shall be verified on site before proceeding with the work.Foster + Partners shall be notified in writing of any discrepancies.Any areas indicated on this sheet are approximate and indicative only.Rev. DateReason For IssueChkRevisionSuite 240San Francisco, CA 94111www.fosterandpartners.comT 408 610 5800OLINLuk and AssociatesPhiladephia, PA 19106T 215 440 0030 / Fax 215 440 0041OLIN Partnership. Ltdwww.theolinstudion.com738 Alfred Nobel DriveHercules, CA 94547www.lukassociates.comT 510 724 3388150 South Independence Mall WestPublic Ledger Building, Suite 1123LANDSCAPE ARCHITECTURE AND URBAN DESIGN1000 Samsome StreetN. Tantau Avenue Pruneridge AvenueAll dimensions shall be verified on site before proceedingwith the work.OLIN shall be notified in writing of any discrepancies.Do not scale drawings. Dimensions govern.1.2.3.4.General Notes5. Any areas indicated on this sheet are approximate andindicative only.All dimensions are in feet and inches unless noted otherwise.P-TA14-X.XX2193Sheet NameDrawing NamePlanning - Site & Architectural ReviewP-TA-14-4.21Landscape Plan RenderingLandscape PlanRenderingDB LEGENDFFAED15' Front Setback25' Interior Side Setback 150' Interior Side Setback From Residential (Buildings Taller Than 16')50' C re e k S e t b a c k 15' Street Side Setback 15' Street Side Setback Public Utility Easement Public Utility Easement CALABAZAS CREEK CORR IDOR 1" = 40'-0"Tantau 14 BuildingApple ParkPhase 201/31/201817380 40'20'80'DBMATCHLINE , SEE L9 .0200Apple Inc.Tantau 14 BuildingApple ParkPhase 201/31/2018PLANNING APPLICATION 1" = 40'-0"0100 01/31/2018 Planning - Site & Architectural ReviewF+P© Foster + Partners 2017NNClientProjectTitleProject No. DateScale at Arch E1NumberKey Plan.General Notes1.2.3.4.5.6.Do not scale drawings. Dimensions govern.All dimensions are in feet and inches unless noted otherwise.All levels are in feet and inches unless noted otherwise.All dimensions shall be verified on site before proceeding with the work.Foster + Partners shall be notified in writing of any discrepancies.Any areas indicated on this sheet are approximate and indicative only.Rev. DateReason For IssueChkRevisionSuite 240San Francisco, CA 94111www.fosterandpartners.comT 408 610 5800OLINLuk and AssociatesPhiladephia, PA 19106T 215 440 0030 / Fax 215 440 0041OLIN Partnership. Ltdwww.theolinstudion.com738 Alfred Nobel DriveHercules, CA 94547www.lukassociates.comT 510 724 3388150 South Independence Mall WestPublic Ledger Building, Suite 1123LANDSCAPE ARCHITECTURE AND URBAN DESIGN1000 Samsome StreetN. Tantau Avenue Pruneridge AvenueAll dimensions shall be verified on site before proceedingwith the work.OLIN shall be notified in writing of any discrepancies.Do not scale drawings. Dimensions govern.1.2.3.4.General Notes5. Any areas indicated on this sheet are approximate andindicative only.All dimensions are in feet and inches unless noted otherwise.P-TA14-X.XX2193Sheet NameDrawing NamePlanning - Site & Architectural ReviewP-TA-14-4.30Landscape Plan - TreesLandscape Plan - TreesSite BDB LEGENDFFAED15' Front Setback25' Interior Side Setback 150' Interior Side Setback From Residential (Buildings Taller Than 16')50' C re e k S e t b a c k 15' Street Side Setback 15' Street Side Setback Public Utility Easement Public Utility Easement CALABAZAS CREEK CORR IDOR 1" = 40'-0"Tantau 14 BuildingApple ParkPhase 201/31/20181738Planting Plan - Herbaceous0 40'20'80'DB00Apple Inc.Tantau 14 BuildingApple ParkPhase 201/31/2018PLANNING APPLICATION 1" = 40'-0"0100 01/31/2018 Planning - Site & Architectural ReviewF+P© Foster + Partners 2017NNClientProjectTitleProject No. DateScale at Arch E1NumberKey Plan.General Notes1.2.3.4.5.6.Do not scale drawings. Dimensions govern.All dimensions are in feet and inches unless noted otherwise.All levels are in feet and inches unless noted otherwise.All dimensions shall be verified on site before proceeding with the work.Foster + Partners shall be notified in writing of any discrepancies.Any areas indicated on this sheet are approximate and indicative only.Rev. DateReason For IssueChkRevisionSuite 240San Francisco, CA 94111www.fosterandpartners.comT 408 610 5800OLINLuk and AssociatesPhiladephia, PA 19106T 215 440 0030 / Fax 215 440 0041OLIN Partnership. Ltdwww.theolinstudion.com738 Alfred Nobel DriveHercules, CA 94547www.lukassociates.comT 510 724 3388150 South Independence Mall WestPublic Ledger Building, Suite 1123LANDSCAPE ARCHITECTURE AND URBAN DESIGN1000 Samsome StreetN. Tantau Avenue Pruneridge AvenueAll dimensions shall be verified on site before proceedingwith the work.OLIN shall be notified in writing of any discrepancies.Do not scale drawings. Dimensions govern.1.2.3.4.General Notes5. Any areas indicated on this sheet are approximate andindicative only.All dimensions are in feet and inches unless noted otherwise.P-TA14-X.XX2193Sheet NameDrawing NamePlanning - Site & Architectural ReviewP-TA14-4.33Planting Plan - Herbaceous LEGENDEV EV Public Utility EasementCALABAZAS CREEKCALABAZAS CREEK CORR IDOR 1" = 40'-0"Tantau 14 BuildingApple ParkPhase 201/31/201817380 40'20'80'DBMATCHLINE , SEE L9 .0100Apple Inc.Tantau 14 BuildingApple ParkPhase 201/31/2018PLANNING APPLICATION 1" = 40'-0"0100 01/31/2018 Planning - Site & Architectural ReviewF+P© Foster + Partners 2017NNClientProjectTitleProject No. DateScale at Arch E1NumberKey Plan.General Notes1.2.3.4.5.6.Do not scale drawings. Dimensions govern.All dimensions are in feet and inches unless noted otherwise.All levels are in feet and inches unless noted otherwise.All dimensions shall be verified on site before proceeding with the work.Foster + Partners shall be notified in writing of any discrepancies.Any areas indicated on this sheet are approximate and indicative only.Rev. DateReason For IssueChkRevisionSuite 240San Francisco, CA 94111www.fosterandpartners.comT 408 610 5800OLINLuk and AssociatesPhiladephia, PA 19106T 215 440 0030 / Fax 215 440 0041OLIN Partnership. Ltdwww.theolinstudion.com738 Alfred Nobel DriveHercules, CA 94547www.lukassociates.comT 510 724 3388150 South Independence Mall WestPublic Ledger Building, Suite 1123LANDSCAPE ARCHITECTURE AND URBAN DESIGN1000 Samsome StreetN. Tantau Avenue Pruneridge AvenueAll dimensions shall be verified on site before proceedingwith the work.OLIN shall be notified in writing of any discrepancies.Do not scale drawings. Dimensions govern.1.2.3.4.General Notes5. Any areas indicated on this sheet are approximate andindicative only.All dimensions are in feet and inches unless noted otherwise.P-TA14-X.XX2193Sheet NameDrawing NamePlanning - Site & Architectural ReviewPlanting Plan -Trees - Site C+DP-TA14-4.32Planting Plan - Trees - Site C+D NTSTantau 14 BuildingApple ParkPhase 201/31/20181738Planting Palette1Tantau 14 TreesNTS3NATIVE LAWN AREANTS4Swale / Stormwater AreasNTS2Screening Plantings and Flowering Evergreen ShrubsNTSQuercus virginiana - Southern Live OakCarex pansa - Pacific Dune SedgeOlea europea 'Swan Hill' - Swan Hill Fruitless OliveFestuca idahoensis 'Tomales Bay'-Blue BunchgrassOlea europea 'Swan Hill' - Swan Hill Fruitless OlivePodocarpus Macrophyllus var. Maki - Japenese YewRosmarinus officinalis 'Alba' - RosemaryIris tenax - Oregon IrisJuncus effusus - Common RushJuncus patens - California Grey RushIris douglasiana - Douglas IrisSisyrinchium bellum - Blue-Eyed Grass6BulbsNTSTriteleia 'Queenfabiola'DBPlatanus racemosa - California SycamoreQuercus shumardii - Shumard OakQuercus rugosa - Netleaf OakCedrus atlantica - Atlantic CedarCedrus atlantica 'Glauca' fastigata - Fastigiata Atlantic CedarJuglans hindsii - California Black Walnut00Apple Inc.Tantau 14 BuildingApple ParkPhase 201/31/2018PLANNING APPLICATION 1" = 40'-0"0100 01/31/2018 Planning - Site & Architectural ReviewF+P© Foster + Partners 2017NNClientProjectTitleProject No. DateScale at Arch E1NumberKey Plan.General Notes1.2.3.4.5.6.Do not scale drawings. Dimensions govern.All dimensions are in feet and inches unless noted otherwise.All levels are in feet and inches unless noted otherwise.All dimensions shall be verified on site before proceeding with the work.Foster + Partners shall be notified in writing of any discrepancies.Any areas indicated on this sheet are approximate and indicative only.Rev. DateReason For IssueChkRevisionSuite 240San Francisco, CA 94111www.fosterandpartners.comT 408 610 5800OLINLuk and AssociatesPhiladephia, PA 19106T 215 440 0030 / Fax 215 440 0041OLIN Partnership. Ltdwww.theolinstudion.com738 Alfred Nobel DriveHercules, CA 94547www.lukassociates.comT 510 724 3388150 South Independence Mall WestPublic Ledger Building, Suite 1123LANDSCAPE ARCHITECTURE AND URBAN DESIGN1000 Samsome StreetN. Tantau Avenue Pruneridge AvenueAll dimensions shall be verified on site before proceedingwith the work.OLIN shall be notified in writing of any discrepancies.Do not scale drawings. Dimensions govern.1.2.3.4.General Notes5. Any areas indicated on this sheet are approximate andindicative only.All dimensions are in feet and inches unless noted otherwise.P-TA14-X.XX2193Sheet NameDrawing NamePlanning - Site & Architectural ReviewP-TA14-4.35Planting PaletteP-TA14-4.33 NTSTantau 14 BuildingApple ParkPhase 201/31/20181738Planting ScheduleDB00Apple Inc.Tantau 14 BuildingApple ParkPhase 201/31/2018PLANNING APPLICATION 1" = 40'-0"0100 01/31/2018 Planning - Site & Architectural ReviewF+P© Foster + Partners 2017NNClientProjectTitleProject No. DateScale at Arch E1NumberKey Plan.General Notes1.2.3.4.5.6.Do not scale drawings. Dimensions govern.All dimensions are in feet and inches unless noted otherwise.All levels are in feet and inches unless noted otherwise.All dimensions shall be verified on site before proceeding with the work.Foster + Partners shall be notified in writing of any discrepancies.Any areas indicated on this sheet are approximate and indicative only.Rev. DateReason For IssueChkRevisionSuite 240San Francisco, CA 94111www.fosterandpartners.comT 408 610 5800OLINLuk and AssociatesPhiladephia, PA 19106T 215 440 0030 / Fax 215 440 0041OLIN Partnership. Ltdwww.theolinstudion.com738 Alfred Nobel DriveHercules, CA 94547www.lukassociates.comT 510 724 3388150 South Independence Mall WestPublic Ledger Building, Suite 1123LANDSCAPE ARCHITECTURE AND URBAN DESIGN1000 Samsome StreetN. Tantau Avenue Pruneridge AvenueAll dimensions shall be verified on site before proceedingwith the work.OLIN shall be notified in writing of any discrepancies.Do not scale drawings. Dimensions govern.1.2.3.4.General Notes5. Any areas indicated on this sheet are approximate andindicative only.All dimensions are in feet and inches unless noted otherwise.P-TA14-X.XX2193Sheet NameDrawing NamePlanning - Site & Architectural ReviewP-TA14-4.34Planting Schedules LEGENDFFAEDCALABAZAS CREEK CORR IDOR 1" = 40'-0"Tantau 14 BuildingApple ParkPhase 201/31/20181738Materials Plan0 40'20'80'CIP CONCRETESIDEWALK PER PACKAGE3 CIVIL DWGS.DBSTART OF CONCRETEWITH WATER REPELLENT.END OF CONCRETE WITHWATER REPELLENT.BENCH.START OF CONCRETEWITH WATER REPELLENT.00Apple Inc.Tantau 14 BuildingApple ParkPhase 201/31/2018PLANNING APPLICATION 1" = 40'-0"0100 01/31/2018 Planning - Site & Architectural ReviewF+P© Foster + Partners 2017NNClientProjectTitleProject No. DateScale at Arch E1NumberKey Plan.General Notes1.2.3.4.5.6.Do not scale drawings. Dimensions govern.All dimensions are in feet and inches unless noted otherwise.All levels are in feet and inches unless noted otherwise.All dimensions shall be verified on site before proceeding with the work.Foster + Partners shall be notified in writing of any discrepancies.Any areas indicated on this sheet are approximate and indicative only.Rev. DateReason For IssueChkRevisionSuite 240San Francisco, CA 94111www.fosterandpartners.comT 408 610 5800OLINLuk and AssociatesPhiladephia, PA 19106T 215 440 0030 / Fax 215 440 0041OLIN Partnership. Ltdwww.theolinstudion.com738 Alfred Nobel DriveHercules, CA 94547www.lukassociates.comT 510 724 3388150 South Independence Mall WestPublic Ledger Building, Suite 1123LANDSCAPE ARCHITECTURE AND URBAN DESIGN1000 Samsome StreetN. Tantau Avenue Pruneridge AvenueAll dimensions shall be verified on site before proceedingwith the work.OLIN shall be notified in writing of any discrepancies.Do not scale drawings. Dimensions govern.1.2.3.4.General Notes5. Any areas indicated on this sheet are approximate andindicative only.All dimensions are in feet and inches unless noted otherwise.P-TA14-X.XX2193Sheet NameDrawing NamePlanning - Site & Architectural ReviewP-TA-14-4.40Materials Plan NTSTantau 14 BuildingApple ParkPhase 201/31/20181738LandscapeMaterialsReferences1STABILIZED AGGREGATE PERMEABLE PAVING NTSDB2CONCRETE SIDEWALKNTS3PLANTING AT BUILDING FACADE/PEDESTRIAN WALKWAYNTS00Apple Inc.Tantau 14 BuildingApple ParkPhase 201/31/2018PLANNING APPLICATION 1" = 40'-0"0100 01/31/2018 Planning - Site & Architectural ReviewF+P© Foster + Partners 2017NNClientProjectTitleProject No. DateScale at Arch E1NumberKey Plan.General Notes1.2.3.4.5.6.Do not scale drawings. Dimensions govern.All dimensions are in feet and inches unless noted otherwise.All levels are in feet and inches unless noted otherwise.All dimensions shall be verified on site before proceeding with the work.Foster + Partners shall be notified in writing of any discrepancies.Any areas indicated on this sheet are approximate and indicative only.Rev. DateReason For IssueChkRevisionSuite 240San Francisco, CA 94111www.fosterandpartners.comT 408 610 5800OLINLuk and AssociatesPhiladephia, PA 19106T 215 440 0030 / Fax 215 440 0041OLIN Partnership. Ltdwww.theolinstudion.com738 Alfred Nobel DriveHercules, CA 94547www.lukassociates.comT 510 724 3388150 South Independence Mall WestPublic Ledger Building, Suite 1123LANDSCAPE ARCHITECTURE AND URBAN DESIGN1000 Samsome StreetN. Tantau Avenue Pruneridge AvenueAll dimensions shall be verified on site before proceedingwith the work.OLIN shall be notified in writing of any discrepancies.Do not scale drawings. Dimensions govern.1.2.3.4.General Notes5. Any areas indicated on this sheet are approximate andindicative only.All dimensions are in feet and inches unless noted otherwise.P-TA14-X.XX2193Sheet NameDrawing NamePlanning - Site & Architectural ReviewP-TA-14-4.41Planting Palette LEGENDFFAEDCALABAZAS CREEK CORR IDOR 1" = 40'-0"Tantau 14 BuildingApple ParkPhase 21738Site LightingDiagram0 40'20'80'DB1L8.0200Apple Inc.Tantau 14 BuildingApple ParkPhase 201/31/2018PLANNING APPLICATION 1" = 40'-0"0100 01/31/2018 Planning - Site & Architectural ReviewF+P© Foster + Partners 2017NNClientProjectTitleProject No. DateScale at Arch E1NumberKey Plan.General Notes1.2.3.4.5.6.Do not scale drawings. Dimensions govern.All dimensions are in feet and inches unless noted otherwise.All levels are in feet and inches unless noted otherwise.All dimensions shall be verified on site before proceeding with the work.Foster + Partners shall be notified in writing of any discrepancies.Any areas indicated on this sheet are approximate and indicative only.Rev. DateReason For IssueChkRevisionSuite 240San Francisco, CA 94111www.fosterandpartners.comT 408 610 5800OLINLuk and AssociatesPhiladephia, PA 19106T 215 440 0030 / Fax 215 440 0041OLIN Partnership. Ltdwww.theolinstudion.com738 Alfred Nobel DriveHercules, CA 94547www.lukassociates.comT 510 724 3388150 South Independence Mall WestPublic Ledger Building, Suite 1123LANDSCAPE ARCHITECTURE AND URBAN DESIGN1000 Samsome StreetN. Tantau Avenue Pruneridge AvenueAll dimensions shall be verified on site before proceedingwith the work.OLIN shall be notified in writing of any discrepancies.Do not scale drawings. Dimensions govern.1.2.3.4.General Notes5. Any areas indicated on this sheet are approximate andindicative only.All dimensions are in feet and inches unless noted otherwise.P-TA14-X.XX2193Sheet NameDrawing NamePlanning - Site & Architectural ReviewP-TA14-4.50Site Lighting Diagram NTSTantau 14 BuildingApple ParkPhase 201/31/20181738Site FurnishingsReferencesDB1 BICYCLE RACK - BOLA SERIESNTS2ASH URN - HUMO SERIESNTS3LITTER BIN - LANDSCAPE FORMS CUSTOMNTS4BENCH - LANDSCAPE FORMS CUSTOMNTS5BOLLARD LIGHTING - NERI CUSTOMNTS6LIGHTPOLE - NERI CUSTOMNTS7FEATURE LIGHTINGNTS00Apple Inc.Tantau 14 BuildingApple ParkPhase 201/31/2018PLANNING APPLICATION 1" = 40'-0"0100 01/31/2018 Planning - Site & Architectural ReviewF+P© Foster + Partners 2017NNClientProjectTitleProject No. DateScale at Arch E1NumberKey Plan.General Notes1.2.3.4.5.6.Do not scale drawings. Dimensions govern.All dimensions are in feet and inches unless noted otherwise.All levels are in feet and inches unless noted otherwise.All dimensions shall be verified on site before proceeding with the work.Foster + Partners shall be notified in writing of any discrepancies.Any areas indicated on this sheet are approximate and indicative only.Rev. DateReason For IssueChkRevisionSuite 240San Francisco, CA 94111www.fosterandpartners.comT 408 610 5800OLINLuk and AssociatesPhiladephia, PA 19106T 215 440 0030 / Fax 215 440 0041OLIN Partnership. Ltdwww.theolinstudion.com738 Alfred Nobel DriveHercules, CA 94547www.lukassociates.comT 510 724 3388150 South Independence Mall WestPublic Ledger Building, Suite 1123LANDSCAPE ARCHITECTURE AND URBAN DESIGN1000 Samsome StreetN. Tantau Avenue Pruneridge AvenueAll dimensions shall be verified on site before proceedingwith the work.OLIN shall be notified in writing of any discrepancies.Do not scale drawings. Dimensions govern.1.2.3.4.General Notes5. Any areas indicated on this sheet are approximate andindicative only.All dimensions are in feet and inches unless noted otherwise.P-TA14-X.XX2193Sheet NameDrawing NamePlanning - Site & Architectural ReviewP-TA-14-4.60Site Furnishings ReferencesP-TA14-4.60 LEGENDFFAEDCALABAZAS CREEK CORRIDOR 1" = 10'-0"Tantau 14 BuildingApple ParkPhase 21738Site Walls Diagram0 10'5'20'1SITE WALLS DIAGRAM1" = 40'-0"DB2EXISTING CMU RESIDENTIAL WALL TO REMIAN00Apple Inc.Tantau 14 BuildingApple ParkPhase 201/31/2018PLANNING APPLICATION 1" = 40'-0"0100 01/31/2018 Planning - Site & Architectural ReviewF+P© Foster + Partners 2017NNClientProjectTitleProject No. DateScale at Arch E1NumberKey Plan.General Notes1.2.3.4.5.6.Do not scale drawings. Dimensions govern.All dimensions are in feet and inches unless noted otherwise.All levels are in feet and inches unless noted otherwise.All dimensions shall be verified on site before proceeding with the work.Foster + Partners shall be notified in writing of any discrepancies.Any areas indicated on this sheet are approximate and indicative only.Rev. DateReason For IssueChkRevisionSuite 240San Francisco, CA 94111www.fosterandpartners.comT 408 610 5800OLINLuk and AssociatesPhiladephia, PA 19106T 215 440 0030 / Fax 215 440 0041OLIN Partnership. Ltdwww.theolinstudion.com738 Alfred Nobel DriveHercules, CA 94547www.lukassociates.comT 510 724 3388150 South Independence Mall WestPublic Ledger Building, Suite 1123LANDSCAPE ARCHITECTURE AND URBAN DESIGN1000 Samsome StreetN. Tantau Avenue Pruneridge AvenueAll dimensions shall be verified on site before proceedingwith the work.OLIN shall be notified in writing of any discrepancies.Do not scale drawings. Dimensions govern.1.2.3.4.General Notes5. Any areas indicated on this sheet are approximate andindicative only.All dimensions are in feet and inches unless noted otherwise.P-TA14-X.XX2193Sheet NameDrawing NamePlanning - Site & Architectural ReviewP-TA14-4.70Site Furnishings References As notedTantau 14 BuildingApple ParkPhase 201/31/20181738Site Sections1SECTION - PRUNERIDGE PLAZA TIRED WALLS1/4" = 1'-0"DB2SECTION - PARKING LOT TREE PITS3/16" = 1'-0"+BW: 158.57TW:160.57+EOP:160.68 +BW:156.29TW:158.29+EOP:155.40 00Apple Inc.Tantau 14 BuildingApple ParkPhase 201/31/2018PLANNING APPLICATION 1" = 40'-0"0100 01/31/2018 Planning - Site & Architectural ReviewF+P© Foster + Partners 2017NNClientProjectTitleProject No. DateScale at Arch E1NumberKey Plan.General Notes1.2.3.4.5.6.Do not scale drawings. Dimensions govern.All dimensions are in feet and inches unless noted otherwise.All levels are in feet and inches unless noted otherwise.All dimensions shall be verified on site before proceeding with the work.Foster + Partners shall be notified in writing of any discrepancies.Any areas indicated on this sheet are approximate and indicative only.Rev. DateReason For IssueChkRevisionSuite 240San Francisco, CA 94111www.fosterandpartners.comT 408 610 5800OLINLuk and AssociatesPhiladephia, PA 19106T 215 440 0030 / Fax 215 440 0041OLIN Partnership. Ltdwww.theolinstudion.com738 Alfred Nobel DriveHercules, CA 94547www.lukassociates.comT 510 724 3388150 South Independence Mall WestPublic Ledger Building, Suite 1123LANDSCAPE ARCHITECTURE AND URBAN DESIGN1000 Samsome StreetN. Tantau Avenue Pruneridge AvenueAll dimensions shall be verified on site before proceedingwith the work.OLIN shall be notified in writing of any discrepancies.Do not scale drawings. Dimensions govern.1.2.3.4.General Notes5. Any areas indicated on this sheet are approximate andindicative only.All dimensions are in feet and inches unless noted otherwise.P-TA14-X.XX2193Sheet NameDrawing NamePlanning - Site & Architectural ReviewP-TA14-4.80Site Sections Architecture - Office PROPERTY LINE EV EVEV EV PROPERTY LINE PROPERTY LI NEPROPERTY LINE14' - 0" OUTLINE OF TANTAU 14 OFFICE ABOVE GRADE PARKING EGRESS STAIR #2 PARKING EGRESS STAIR #1 EV EV 02 P-TA14-5.10 02 P-TA14-5.10 01 P-TA14-5.10 03 P-TA14-5.1068'-9"128' - 0"196'-9"468' - 0" AIR INTAKE SHAFT #1 AIR INTAKE SHAFT #2 AIR INTAKE SHAFT #3 AIR EXHAUST SHAFT #1 AIR EXHAUST SHAFT #2 56'-0"233'-0"10'-0"179'-0" PROJECT BENCHMARK N 9378' - 1 15/32" E 12007' - 1 5/16" GRID 01-2 WITH A-02 24' - 0" ELEVATOR #1 ELEVATOR #2 24' - 0"18' - 0"24' - 0"38' - 0"18' - 0"STAIR / ELEVATOR LOBBY LOBBY VESTIBULE 18' - 0"24' - 0"STORAGE ROOM #2 ELECTRICAL ROOMEF ROOM SPACE TBC 24' - 0"38' - 0"18' - 0"24' - 0"24' - 0" UP TO LEVEL B2 PARKING RAMP - 6% MAX. SLOPE SPACE TBC CP CP CP CPCP CPCP CP EV EV ON-RAMP PARKING STALLS, SHOWN DASHED STORAGE ROOM #1 N. Tantau AvenuePruneridge Avenue © Foster + Partners 2017 N N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. General Notes 1. 2. 3. 4. 5. 6. Do not scale drawings. Dimensions govern. All dimensions are in feet and inches unless noted otherwise. All levels are in feet and inches unless noted otherwise. All dimensions shall be verified on site before proceeding with the work. Foster + Partners shall be notified in writing of any discrepancies. Any areas indicated on this sheet are approximate and indicative only. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street 1" = 20'-0" 00 Apple Inc. Tantau 14 Building Apple Park Phase 2 01/31/2018 P-TA14-5.00 2193 PLANNING APPLICATION Plan View Level B3 1" = 20'-0"01 Level B03 139 00 08 00 08 155 Standard Parking Stalls (8'-6" x 18'-0") Accessible Parking Stalls (9'-0" x 18'-0") Electric Vehicle (EV) Charging Stalls Accessible & EV Charging Stalls Carpool Stalls TOTAL Level B3 Parking Stall Calculations Gross Floor Area: 63,756 sf 00 01/31/2018 Planning - Site & Architectural Review F+P EV EV 14' - 0" PROPERTY LINE PROPERTY LINE PROPERTY LI NEPROPERTY LINEOUTLINE OF TANTAU 14 OFFICE ABOVE GRADE PARKING EGRESS STAIR #2 PARKING EGRESS STAIR #1 EV EV EV EV 03 P-TA14-5.10 PROJECT BENCHMARK N 9378' - 1 15/32" E 12007' - 1 5/16" GRID 01-2 WITH A-02 68'-9"128' - 0"196'-9"468' - 0" 179'-0" AIR INTAKE SHAFT #1 AIR INTAKE SHAFT #2 AIR INTAKE SHAFT #3 24' - 0" AIR EXHAUST SHAFT #2 AIR EXHAUST SHAFT #1 ELEVATOR #1 ELEVATOR #2 56'-0"233'-0"10'-0" 24' - 0"24' - 0"24' - 0"18' - 0"24' - 0"38' - 0"38' - 0"24' - 0"STAIR / ELEVATOR LOBBY LOBBY VESTIBULE 18' - 0"24' - 0"18' - 0"18' - 0"SPACE TBC DN TO LEVEL B3 PARKING RAMP - 6% MAX. SLOPE 02 P-TA14-5.10 02 P-TA14-5.10 01 P-TA14-5.10 CP CP CP CPCP CPCP CP EV EVEV EV ON-RAMP PARKING STALLS, SHOWN DASHED STORAGE ROOM #2 ELECTRICAL ROOMEF ROOM STORAGE ROOM #1 N. Tantau AvenuePruneridge Avenue © Foster + Partners 2017 N N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. General Notes 1. 2. 3. 4. 5. 6. Do not scale drawings. Dimensions govern. All dimensions are in feet and inches unless noted otherwise. All levels are in feet and inches unless noted otherwise. All dimensions shall be verified on site before proceeding with the work. Foster + Partners shall be notified in writing of any discrepancies. Any areas indicated on this sheet are approximate and indicative only. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street 1" = 20'-0" 00 Apple Inc. Tantau 14 Building Apple Park Phase 2 01/31/2018 P-TA14-5.01 2193 PLANNING APPLICATION Plan View Level B2 1" = 20'-0"01 Level B02 Gross Floor Area: 63,756 sf 152 00 08 00 10 170 Standard Parking Stalls (8'-6" x 18'-0") Accessible Parking Stalls (9'-0" x 18'-0") Electric Vehicle (EV) Charging Stalls Accessible & EV Charging Stalls Carpool Stalls TOTAL Level B2 Parking Stall Calculations 00 01/31/2018 Planning - Site & Architectural Review F+P OUTLINE OF TANTAU 14 OFFICE ABOVE GRADE VAN RAMP UP MAIN ELECTRICAL ROOM EV EV EV EV EV EVEV EV EVEV EV EV PROPERTY LINE PROPERTY LINE PROPERTY LI NEPROPERTY LINEPARKING EGRESS STAIR #2 PARKING EGRESS STAIR #1 EVEV 03 P-TA14-5.10 EV EV 24' - 0"24' - 0"24' - 0"52' - 11"52' - 11"56'-0"74'-11"8'-2"149'-11"10'-0"68'-9"128' - 0"196'-9"468' - 0" 116'-11"8'-2"53'-11" AIR INTAKE SHAFT #1 AIR INTAKE SHAFT #2 AIR INTAKE SHAFT #324' - 0"18' - 0"24' - 0"38' - 0"38' - 0"24' - 0"18' - 0"PROJECT BENCHMARK N 9378' - 1 15/32" E 12007' - 1 5/16" GRID 01-2 WITH A-02 AIR EXHAUST SHAFT #2 AIR EXHAUST SHAFT #1 STAIR / ELEVATOR LOBBY ELEVATOR #1 ELEVATOR #2 SPACE TBC ER ROOM JANITOR CLOSET MALE SHOWER RM. FEMALE SHOWER RM. SERVICE ROOM #1 UP DN LOBBY VESTIBULE 18'-0"18' - 0"24' - 0"02 P-TA14-5.10 02 P-TA14-5.10 01 P-TA14-5.10 EV EVCP CP CP CP CP CPCP CP CP CP CP CP CPCP SERVICE ROOM #2 SERVICE ROOM #3 JANITOR CLOSET DN TO LEVEL B2 PARKING RAMP - 6% MAX. SLOPE ON-RAMP PARKING STALLS, SHOWN DASHED TO GRADE LEVEL N. Tantau AvenuePruneridge Avenue © Foster + Partners 2017 N N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. General Notes 1. 2. 3. 4. 5. 6. Do not scale drawings. Dimensions govern. All dimensions are in feet and inches unless noted otherwise. All levels are in feet and inches unless noted otherwise. All dimensions shall be verified on site before proceeding with the work. Foster + Partners shall be notified in writing of any discrepancies. Any areas indicated on this sheet are approximate and indicative only. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street 1" = 20'-0" 00 Apple Inc. Tantau 14 Building Apple Park Phase 2 01/31/2018 P-TA14-5.02 2193 PLANNING APPLICATION Plan View Level B1 1" = 20'-0"01 Level B01 Gross Floor Area: 52,698 sf 86 06 16 02 14 124 Standard Parking Stalls (8'-6" x 18'-0") Accessible Parking Stalls (9'-0" x 18'-0") Electric Vehicle (EV) Charging Stalls Accessible & EV Charging Stalls Carpool Stalls TOTAL Level B1 Parking Stall Calculations 00 01/31/2018 Planning - Site & Architectural Review F+P ONLYONLYONLYONLYONLYONLYONLYONLY16' - 0"488' - 0"16' - 0" 520' - 0"24'-0"PARKING STRUCTURE EGRESS STAIR #2 EVEV EVEVEV EV NORTH TANTAU AVENUE PRUNERIDGE AVENUEAIR INTAKE SHAFT #1 AIR INTAKE SHAFT #2 AIR INTAKE SHAFT #3 RAMP DN 25' REAR SETBACK 5 0 '-0 "50' RI PARI AN SETBACK15' FRONT SETBACK PROPERTY LINE PROPERTY LINE15' STREET SIDE SETBACKPROPERTY LI NENOTE: 150' INTERIOR SIDE SETBACK FROM PROPERTY LINE (NO BUILDINGS TALLER THAN 16'-0") PUBLIC UTILITY EASEMENT 10'-0"25'-0"15'-0"15'-0" PROJECT BENCHMARK N 9378' - 1 15/32" E 12007' - 1 5/16" GRID 01-2 WITH A-02 VTA BUS SHELTER 15' FRONT SETBACK PROPERTY LINE VEHI CLE QUEUE ZONEEVEV EVEV EV EV EVEV EV94'-0"UP DN UP UP FFL 0' - 0" FFL 0' - 0" FFL 0' - 0" FFL 0' - 0" 4 STALLS 5 STALLS6 STALLS6 STALLS 6 STALLS 3 STALLS 6 STALLS6 STALLS3 STALLS3 STALLS6 STALLS9 STALLS 3 STALLS 6 STALLS 6 STALLS 6 STALLS 6 STALLS 6 STALLS 6 STALLS 6 STALLS 6 STALLS 6 STALLS 6 STALLS 5 STALLS 4 STALLS 5 STALLS PARKING STRUCTURE EGRESS STAIR #1 OUTLINE OF TANTAU 14 PARKING STRUCTURE BELOW GRADE, SHOWN DASHED EVEV AMSL FFL (+161'-0")AMSL FFL (+161'-0") AMSL FFL (+161'-0") AMSL FFL (+161'-0") RAMP WALL VAN EXISTING RESIDENTIAL CMU WALL TO REMAIN DN DN CALABAZAS CREEKSITE WALLS 02 P-TA14-5.20 04 P-TA14-5.20 01 P-TA14-5.20 03 P-TA14-5.20 P-TA14-5.10 01 P-TA14-5.10 02 P-TA14-5.10 03 P-TA14-5.10 (E) AT&T VAULT (E) TRAFFIC CTRL. EQUIP. TO LEVEL B1 EV MAIL ROOM SERENITY ROOM DRY CLEANING ROOM WOMEN'S BATHROOM MEN'S BATHROOM JC MOTHER ROOM TELECOM ROOM ELEC. RM.ELEV. #1RECEPTIONALL GENDER BATHROOM STAIR #1ELEV. #2STAIR #2 STAIR #3 FDC BACKFLOW FIRE HYDRANT(E) FIRE HYDRANT BIKE RACKSBIKE RACKS ELEC. RM.ELEVATOR LOBBYFIRE RISER CL. OFFICEOFFICE 12'-0"RAMP UP EVEV LOUVERED SERVICE YARD RAMP UPRAMP UPEV EV EV EV T.B.C. 25' REAR SETBACK T.O.P. 16'-0" A.F.G. SERVICE YARD T.O.W. 3'-7" A.F.G. EGRESS STAIR WALL T.O.W. 3'-7" A.F.G. EGRESS STAIR WALL 6' - 0"OUTLINE OF TANTAU 14 PARKING STRUCTURE BELOW GRADE, SHOWN DASHED PROPERTY LINE TRANSFORMER COMPACTORS SWITCH GEAR 24'-0"24'-0"37' - 0"24' - 0"24' - 0"BAILER N. Tantau AvenuePruneridge Avenue © Foster + Partners 2017 N N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. General Notes 1. 2. 3. 4. 5. 6. Do not scale drawings. Dimensions govern. All dimensions are in feet and inches unless noted otherwise. All levels are in feet and inches unless noted otherwise. All dimensions shall be verified on site before proceeding with the work. Foster + Partners shall be notified in writing of any discrepancies. Any areas indicated on this sheet are approximate and indicative only. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street 1" = 20'-0" 00 Apple Inc. Tantau 14 Building Apple Park Phase 2 01/31/2018 P-TA14-5.03 2193 PLANNING APPLICATION Plan View Level 01 1" = 20'-0"01 Level 01 Gross Floor Area: 42,741 sf Note: Elevations inside (XXX'-X") are based on project benchmark. 123 04 24 00 00 151 Standard Parking Stalls (8'-6" x 18'-0") Accessible Parking Stalls (9'-0" x 18'-0") Electric Vehicle (EV) Charging Stalls Accessible & EV Charging Stalls Carpool Stalls TOTAL Grade Level 01 Parking Stall Calculations 498 10 60 02 30 600 Standard Parking Stalls (8'-6" x 18'-0") Accessible Parking Stalls (9'-0" x 18'-0") Electric Vehicle (EV) Charging Stalls -10% Accessible & EV Charging Stalls Carpool Stalls (CP) -5% TOTAL Total Parking Stall Calculations 00 01/31/2018 Planning - Site & Architectural Review F+P 488' - 0" 520' - 0" GREEN ROOF 5,632 sf DN DN ? OFFICE STAIR #2 OFFICE FFL 16' - 10 1/2"FFL 16' - 10 1/2" FFL 16' - 10 1/2" FFL 16' - 10 1/2" 03 P-TA14-5.20 01 P-TA14-5.10P-TA14-5.10 02 P-TA14-5.10 04 P-TA14-5.20 02 P-TA14-5.20 01 P-TA14-5.20 03 P-TA14-5.10 SERENITY ROOM MEETING ROOM WOMEN'S BATHROOM MEN'S BATHROOM JC MOTHER ROOM TELECOM ROOM ELEC. RM.ELEV. #1ELEV. #2ELEC. RM.ELEVATOR LOBBYFIRE RISER CL. T.B.C.BREAK ROOM STAIR #116' - 0"16'-0" STAIR #3 ALL GENDER BATHROOM 16' - 0"424' - 0"16' - 0" 456' - 0" SLOPE SLOPE SLOPESLOPESLOPESLOPEAHU PAD #2AHU PAD #1LOUVERED MECH. SCREEN 100'-0"6'-0"04 P-TA14-5.20 AHU PAD #4AHU PAD #303 P-TA14-5.20 01 P-TA14-5.10P-TA14-5.10 02 P-TA14-5.10 04 P-TA14-5.20 02 P-TA14-5.20 01 P-TA14-5.20 03 P-TA14-5.10 LEVEL 02 GREEN ROOF BELOW EQUIPMENT PADAIR CHILLER PADT.O.P. 40' - 3 1/2"T.O.P. 31' - 2 1/2" T.O.P. 38' - 9 1/2" T.O.P. 38' - 9 1/2"T.O.P. 38' - 9 1/2" LOUVERED MECH. PENTHOUSE T.O.P. 38' - 9 1/2" EXIT STAIR / ELEV. OVERRUN PENTHOUSE T.O.W. 39'-1"6' - 0"88' - 0"N. Tantau AvenuePruneridge Avenue © Foster + Partners 2017 N N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. General Notes 1. 2. 3. 4. 5. 6. Do not scale drawings. Dimensions govern. All dimensions are in feet and inches unless noted otherwise. All levels are in feet and inches unless noted otherwise. All dimensions shall be verified on site before proceeding with the work. Foster + Partners shall be notified in writing of any discrepancies. Any areas indicated on this sheet are approximate and indicative only. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street 1" = 20'-0" 00 Apple Inc. Tantau 14 Building Apple Park Phase 2 01/31/2018 P-TA14-5.04 2193 PLANNING APPLICATION Plan View Level 02 & Roof Level 1" = 20'-0"01 Level 02 1" = 20'-0"02 Roof Level Mechanical Area: 15,466 sf Gross Floor Area: 37,301 sf 00 01/31/2018 Planning - Site & Architectural Review F+P 60' HEIGHT SETBACK (MAX.)50' SETBACKRIPARIAN CORRIDORPROPERTY LINE15' STREET SIDE SETBACKAIR EXHAUST SHAFT #2 AIR EXHAUST SHAFT #1 TOP 31' - 2 1/2" TOW 39' - 1" MECH. SCREEN LEVEL 02 LEVEL 01 FFL 16' - 10 1/2" FFL 0' - 0" PRUNERIDGE AVE. 02 __ 01 DRIVE ASILE SITE WALLS PROPERTY LINEOFFICE OFFICE OFFICE OFFICE LEVEL B01 - CORE LEVEL B02 - CORE LEVEL B03 - CORE PARKING LEVEL B1 PARKING LEVEL B2 PARKING LEVEL B3 SSL -20' - 11" SSL -31' - 5" SSL -41' - 11" LEVEL B01 - PARKING STRUCTURE LEVEL B02 - PARKING STRUCTURE LEVEL B03 - PARKING STRUCTURE AIR INTAKE 0'-6" A.F.G. 03 _ N. TANTAU AVE.PROPERTY LINE15' FRONT SETBACK25' REAR SETBACKDRIVE ASILE1:1 SLOPE FRONT SETBACK60' HEIGHT SETBACK (MAX.)PROPERTY LINE150' REAR SETBACKDRIVE ASILE 16' HEIGHT SETBACK (MAX.) OFFICE OFFICE SITE WALLS (E) RESIDENTIAL WALL T.O.W. 8'-0" A.F.G. AIR INTAKE TOP 31' - 2 1/2" TOW 39' - 1" MECH. SCREEN LEVEL 02 LEVEL 01 FFL 0' - 0" FFL 16' - 10 1/2" N. TANTAU AVE. 0'-6" A.F.G. 03 _PROPERTY LINE15' FRONT SETBACK25' REAR SETBACK16' HEIGHT SETBACK (MAX.) DRIVE ASILE1:1 SLOPE FRONT SETBACK60' HEIGHT SETBACK (MAX.)PROPERTY LINE150' REAR SETBACKDRIVE ASILE VTA BUS SHELTER LEVEL B01 - PARKING LEVEL B02 - PARKING LEVEL B03 - PARKING LEVEL B01 - CORE LEVEL B02 - CORE LEVEL B03 - CORE PARKING RAMP PARKING RAMP LEVEL 01 - CORE LEVEL 02 - CORE EXIT STAIR WALL (E) RESIDENTIAL WALL T.O.W. 8'-0" A.F.G.T.O.W. 3'-7" A.F.G.N. Tantau AvenuePruneridge Avenue © Foster + Partners 2017 N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. General Notes 1. 2. 3. 4. 5. 6. Do not scale drawings. Dimensions govern. All dimensions are in feet and inches unless noted otherwise. All levels are in feet and inches unless noted otherwise. All dimensions shall be verified on site before proceeding with the work. Foster + Partners shall be notified in writing of any discrepancies. Any areas indicated on this sheet are approximate and indicative only. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street 1" = 20'-0" 00 Apple Inc. Tantau 14 Building Apple Park Phase 2 01/31/2018 P-TA14-5.10 2193 PLANNING APPLICATION Sections 1" = 20'-0"03 Longitudinal Section 1" = 20'-0"02 Typical Cross Section 1" = 20'-0"01 Cross Section at Building Core 00 01/31/2018 Planning - Site & Architectural Review F+P 60' HEIGHT SETBACK (MAX.)PRUNERIDGE AVE.0' - 0" 16' - 10 1/2" 31' - 2 1/2" 39' - 1" 40' - 3 1/2" LEVEL 02 LEVEL 01 T.O.P. LOUVER MECH. SCREEN MECH. PENTHOUSE T.O.W. T.O.P. F.F.L. F.F.L.(+161-0" AMSL)PROPERTY LINE15' FRONT SETBACK25' REAR SETBACK16' HEIGHT SETBACK (MAX.)1:1 SLOPE FRONT SETBACK60' HEIGHT SETBACK (MAX.)PROPERTY LINE150' REAR SETBACK(+161-0" AMSL) LEVEL 02 LEVEL 01 T.O.P. LOUVER MECH. SCREEN MECH. PENTHOUSE T.O.W. T.O.P. F.F.L. F.F.L. 40' - 3 1/2" 39' - 1" 31' - 2 1/2" 16' - 6 1/2" 0' - 0"N. TANTAU AVE.DRIVE ASILEDRIVE ASILE VTA BUS SHELTER GREEN ROOF (+161-0" AMSL) LEVEL 02 LEVEL 01 T.O.P. LOUVER MECH. SCREEN MECH. PENTHOUSE 40' - 3 1/2"N. TANTAU AVE.PROPERTY LINE15' FRONT SETBACK25' REAR SETBACK1:1 SLOPE FRONT SETBACK60' HEIGHT SETBACK (MAX.)PROPERTY LINE150' REAR SETBACKT.O.W.39' - 1" T.O.P. 31' - 2 1/2" 0' - 0" 16' - 10 1/2"F.F.L. F.F.L. LOUVERED SERVICE YARD ROOF (E) RESIDENTIAL WALL T.O.W. 8'-0" A.F.G.T.O.P. 16'-0" A.F.G. AIR INTAKE 0'-6" A.F.G. 16' HEIGHT SETBACK (MAX.) DRIVE ASILE RAMP DN. 60' HEIGHT SETBACK (MAX.) PRIVACY FRIT WITHIN GLASS ASSEMBLY, SHOWN HATCHED PRUNERIDGE AVE.T.O.P. 0' - 0" 16' - 10 1/2" 31' - 2 1/2" 39' - 1" 40' - 3 1/2" MECH. PENTHOUSE LOUVERED MECH. SCREEN T.O.P. LEVEL 02 LEVEL 01 T.O.P T.O.W. F.F.L. F.F.L.(+161'-0" AMSL)N. Tantau AvenuePruneridge Avenue © Foster + Partners 2017 N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. General Notes 1. 2. 3. 4. 5. 6. Do not scale drawings. Dimensions govern. All dimensions are in feet and inches unless noted otherwise. All levels are in feet and inches unless noted otherwise. All dimensions shall be verified on site before proceeding with the work. Foster + Partners shall be notified in writing of any discrepancies. Any areas indicated on this sheet are approximate and indicative only. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street 1" = 20'-0" 00 Apple Inc. Tantau 14 Building Apple Park Phase 2 01/31/2018 P-TA14-5.20 2193 PLANNING APPLICATION Elevations West, North & South 1" = 20'-0"03 West Elevation 1" = 20'-0"02 North Elevation 1" = 20'-0"01 South Elevation 1" = 20'-0"04 East Elevation 00 01/31/2018 Planning - Site & Architectural Review F+P 1. ROOFTOP PENTHOUSE LOUVERS 2. ROOFTOP MECHANICAL SCREEN 3. CONCRETE EYEBROW (CORNERS TO BE CURVED) 4. INTERNAL ROLLER BLINDS 5. HIGH PERFORMANCE GLAZED CURVED CORNERS 6. HIGH PERFORMANCE DOUBLE GLAZED WINDOWS WITH MULLIONS 7. GREEN ROOF N. Tantau AvenuePruneridge Avenue © Foster + Partners 2017 N Client Project Title Project No. Date Scale at Arch E1 Number Key Plan. General Notes 1. 2. 3. 4. 5. 6. Do not scale drawings. Dimensions govern. All dimensions are in feet and inches unless noted otherwise. All levels are in feet and inches unless noted otherwise. All dimensions shall be verified on site before proceeding with the work. Foster + Partners shall be notified in writing of any discrepancies. Any areas indicated on this sheet are approximate and indicative only. Rev.Date Reason For Issue Chk Revision Suite 240 San Francisco, CA 94111 www.fosterandpartners.com T 408 610 5800 OLIN Luk and Associates Philadephia, PA 19106 T 215 440 0030 / Fax 215 440 0041 OLIN Partnership. Ltd www.theolinstudion.com 738 Alfred Nobel Drive Hercules, CA 94547 www.lukassociates.com T 510 724 3388 150 South Independence Mall West Public Ledger Building, Suite 1123 LANDSCAPE ARCHITECTURE AND URBAN DESIGN 1000 Samsome Street 1/4" = 1'-0" 00 Apple Inc. Tantau 14 Building Apple Park Phase 2 01/31/2018 P-TA14-5.30 2193 PLANNING APPLICATION North Facade Rendered Elevation & External Materials 00 01 Elevation - Typical North & South Bay External Material 00 01/31/2018 Planning - Site & Architectural Review F+P From:Mil37 To:City of Cupertino Planning Dept. Cc:JSchwilk@santaclaraca.gov Subject:Apple permit revision Date:Friday, July 27, 2018 12:08:34 PM I understand your department can provide me with an Apple phone number and email address so that I can pass complaints, comments and questions on the construction going on the other side of our common fence. Also as notice of an August 9th meeting on their permit revision, I want to state full support for underground parking of employees with surface parking limited for visitors. The original two story parking structure would severely damage our enjoyment of our backyard. Another concern I have is any removal of the eight foot concrete fence provided by the earlier owners to get permit approval one foot into Cupertino (Santa Clara has a six foot limitation). My imagination finds evidence in the planning picture that our fence remains in parallel to a new probably fiber glass and polymer painted fence. I’d have no problem with that as long as access to the gap is limited by lock and key gate at each end. I have a desire to attend the August 9 meeting. Please advise any changes of timing, location, or content. Milt Kostner 530 Meadow Ave Santa Clara California 95051 408-747-7759 Mil37@comcast.net Total Control Panel Login To: planning@cupertino.org From: mil37@comcast.net Message Score: 1 High (60): Pass My Spam Blocking Level: High Medium (75): Pass Low (90): Pass Block this sender Block comcast.net This message was delivered because the content filter score did not exceed your filter level.