Loading...
Joseph Fruen_RedactedFrom: Joseph Fruen ] Sent: Monday, March 12,2018 1:05 PM To: City of Cupertino Planning Dept. <planning@cupertino.org> Cc: Grace Schmidt <graces@cupertino.org>; City Clerk <CityClerk@cupertino.org> Subject: For public comment re: EIR scope and the 2/22/2018 EIR scoping meeting To: Planning Staff: At the February 22, 2018 EIR scoping meeting and in subsequent public discussion, a number of individuals have raised the question of whether an EIR project alternative may legally go beyond what the Cupertino General Plan permits. Please accept this comment in part as a response to these concerns. As a preliminary matter, even cursory recourse to the CEQA Guidelines reveals that there is "no ironclad rule governing the nature or scope of the alternatives to be discussed other than the rule of reason." Cal. Code Regs., tit. 14, § 15126.6(a). While the precise effect of CEQA Guidelines remains unclear, our courts, at a minimum, have historically accorded them great weight. Laurel Heights Improvement Ass'n v. Regents of the Univ. of California, 47 Ca1.3d 376, 391 n.2 (1988). Furthermore, in interpreting EIR scoping requirements, our Supreme Court has directly answered the question of whether an EIR may consider a project alternative outside the bounds of a municipality's general plan: "an EIR may properly consider an inconsistent land -use designation in the general plan ... in assessing the feasibility of a project alternative" and "in some circumstances, an EIR may consider alternatives requiring a site-specific amendment of the general plan." Citizens of Goleta Valley v. Bd. of Supervisors of Santa Barbara County, 52 Cal.3d 553, 573 (1990) (emphasis in original). Simply put, public claims that EIR plan alternatives for the Vallco Specific Plan that breach the bounds of Cupertino's General Plan are not, for that reason alone, illegal or cause for invalidation of the EIR. In accordance with Citizens of Goleta Valley, Cupertino may study plan alternatives outside the bounds of the city's current General Plan as part of the Vallco Specific Plan EIR--the EIR plan alternatives need only satisfy Guideline 15126.6(a)'s rule of reason. Citizens of Goleta Valley, 52 Ca1.3d at 576. Conversely, Laurel Heights, supra, may actually require that the city study a maximum housing buildout plan alternative consistent with a potential project application under SB 35 and AB 1515 at the Vallco site as one of the EIR plan alternatives in order for the EIR to be considered substantial evidence. At a minimum, any agency action on an EIR must rely on substantial evidence. In order for an EIR and evidence of mitigation to be substantial, a project EIR must consider the cumulative effects of a project. Cal. Code Regs., tit. 14, § 15130; Laurel Heights, 47 Ca1.3d at 394. A project's "cumulative effects" include past, present and probable future projects, even if those projects would be outside the agency's jurisdictional control. Cal. Code Regs., tit. 14, § 15130; Laurel Heights 47 Cal.3d at 394. As of January 31, 2018, Cupertino is subject to certain streamlining provisions of SB 35 because of the city's failure to permit and build sufficient quantities of affordable housing to satisfy its Regional Housing Need Allocation (RHNA) requirements. That status will remain in place for a number of years until the next RHNA assessment. As such, it would be reasonable to foresee a probable future project under SB 35 being proposed for the Vallco site. Inclusion of a maximum housing buildout at Vallco consistent with the requirements of SB 35 and AB 1515 as one of the plan alternatives in the Vallco Specific Plan EIR would therefore satisfy analysis of cumulative effects of the project under consideration and help ensure that any EIR ultimately certified constitutes substantial evidence under the Guidelines. In summary, public comments to the effect that study of EIR plan alternatives outside the bounds of Cupertino's General Plan would be illegal are an incorrect statement of law. In addition, the city should study as one of the EIR plan alternatives a maximum housing buildout consistent with a probable application under SB 35 and AB 1515 at the Vallco site in order to insulate the city's EIR process against legal attack. Many thanks for your consideration, J.R. Fruen, Esq.