Loading...
HomeMy WebLinkAboutAH Summary 04-12-2018OFFICE OF. COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE o CUPERTINO, CA 95014-3255 (408) 777-3308 o FAX (408) 777-3333 > planning(& cupertino.org To: Mayor and City Council Members Planning Commissioners From: Benjamin Fu, Assist. Director of Community Development Date: April 17, 2018 Subj: REPORT OF ADMINISTRATIVE HEARING DECISION MADE April 12, 2018 Chapter 19.12.170 of the Cupertino Municipal code provides for Appeal of decisions made at an Administrative Hearing 1L. Application TM -2017-02; R-2018-08, R-2018-09, TR -2018-05 (EA -2017-02), Cindy Hsu (Greenleaf Group, LLC), 22561 Alcalde Road Description Tentative Map application to allow the subdivision of a 19,562 square foot lot into 2 residential lots of approximately 8,892 square feet each; and to allow the construction of 2, new two-story single family residences on the newly created lots; and a Tree Removal Permit to allow the removal and replacement of trees to facilitate the residential construction; A Mitigated Negative Declaration Action The application was approved at the Administrative Hearing. The approval is effective April 12, 2018. The fourteen -calendar day appeal will expire on April 26, 2018. Enclosures: Administrative Hearing Report of April 12, 2018 Resolution No(s) 88, 89, 90 and 91 Plan set Subject OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE e CUPERTINO, CA 95014-3255 (408) 777-3308 e FAX (408) 777-3338 e r1anningy@cupertino.org ADMINISTRATIVE HEARING STAFF REPORT Agenda Date: April 12, 2018 Mitigated Negative Declaration, Tentative Map, Two -Story Permit, and Tree Removal Permit applications to allow the subdivision and development of an approximately 0.44 acre lot into two (2) parcels of approximately 8,892 square feet each; (Application No(s).: TM -2017-02 (EA -2017-02), R-2018-08, R-2018-09, TR -2018-05; Applicant(s): Cindy Hsu; Location: 22561 Alcalde Road; APN(s): 342-29-063) Recommended Action That the Hearing Officer adopt draft resolutions to: a. Adopt a Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (Attachment 1); and b. Approve the Tentative Map application (Attachment 2); c. Approve the Two -Story Permit applications (Attachment 3); and d. Approve the Tree removal Permit application (Attachment 4.) Discussion Project Data: r en'ea]1 llara7�llnng Inspiration Heights Neighborhood LIE_ Low Density (1-5 DU/Ac.) R1-7.5 ,firs:,z3.'dki#%" 5:3Y''E �3Lv�,ftr �e,3a 4 m� 4 f ✓# k i ,E �;c3 #S; iZ�i iy�sa siRgart, 9 i#, ?kA"�.§tiY . bf,�F... £, H ''.rc Y a" F .! k P °"' #?b_sY'iw`�y ?%K�,,`� r`3,z', J. i >;r s3 ,. & 2 S" :: £s'¢ L w N kaX'�i� "S fid '8ryra° , c¢�y€; � I�'�l. lRfuv'„P&9•C :{._. v. � s.i 2.27 DU/acre �4' �3. a; ..- � E �� $'�' ,z' S ,.rY ., ✓. ,. _ ct... Fd- .,,,,,'mlM"i 5 DU/acre 001 De�sntIn §y10,10 # ME 19,562 square feet (0,44 acres) L®tp�ze �nq 17,784 square feet (0.40 acres) � } iT�t.ILt Areae, E' ✓ E b ri '�sie w c�Z _#' ' 3�b4 `� � -q- 3 S � �' ,$ f '�r �,3 r�e��J�3,eyelop�m��n3t 4.�n ���,�1ll��re�wr#. � � 7,500 (min.) 8,892 sf 8,892 sf ........... ryof{Saes�� � u S% 4,001 sf 3,998 sf 3,998 sf Rx3(mc 45%0)'65 w FA I of overage (anax 50 Ip) 4,446 sf 4,049 sf 4,049 sf � TM -2017-02, EA -2017-02, 22561 Alcalde Road R-2018-08, R-2018-09, TR -2018-05 Paae 2 of 7 April 12, 2018 20' 21'6" 20' 20' 22'6" 22,6„ 15' combined (no side yard setback 76" 1911" and 76" shall be less than 5') 25' 25' 25' 25' 31'6" 31'-6" 25' combined (no side yard setback 26'10"and 277" 277 and 24'10" shall be less than 10') 66% 44.29% 44.29% 28' 26, 26' family residences, wim aupiexes adjacent to the site to the north and across Alcalde Road to the south. A 4 - unit single family residential planned development is also located at the southwest corner of the intersection of Alcalde Road and S. Foothill Boulevard. The project site currently contains a single family home (approximately 2,500 square feet), and a detached garage (approximately 600 square feet). Vegetation present on the site consists of gardens typical of single family residences in the area, as well as a small number of trees including, but not limited to, coast live oak and pine. TM -2017-02, EA -2017-02, 22561 Alcalde Road April 12, 2018 R-2018-08, R-2018-09, TR -2018-05 Page 3 of 7 Analysis: Conformance with General Plan and Zoning The proposed project is consistent with the General Plan land use (low density residential) and density (1-5 dwelling units/acre) which allows a maximum of two (2) dwelling units on the site based on its acreage. Development Allocation Since there is only one residence on the property, the proposed subdivision will need an allocation of one (1) unit from the Citywide residential development allocation. This will leave a balance of 98 units in this allocation pool. Subdivision Design, & Street Improvements The project proposal will create two lots with frontage on Alcalde Road. The proposed lot width, of approximately 89 feet each, is more than the lot development standards of the Single Family (R1) ordinance minimum of 60 feet. The proposed lots are rectangular and, at 8,892 sf each, are equal in size. The project is required to dedicate 10' of its existing frontage as right-of-way in order to accommodate required off-site improvements consisting of a detached sidewalk, curb and gutter, street trees, and pavement work. The resulting dedication reduces the existing lot size from 19,562 square feet to 17,784 square feet. The off-street modifications to the parcel frontage will be similar to the existing off-site improvements in front of 22539 and 22519 Alcalde Road to the east of the project site. Tree Removal Permit There is only one protected tree on the property, a 37" Coast Live Oak (Quercus agrifolia) tree on the proposed Parcel B, which the applicant is proposing to remove, to allow development of the site. The tree, because of its species and size, is considered protected and necessitates a tree removal permit. Consistent with Cupertino Municipal Code Chapter 14.18: Protected Trees, the applicant proposes the replacement of the removed tree with a 36 -inch box Coast Live Oak. In the event, that the City's Arborist determines that the location of the replacement tree is in conflict with the location of new street trees or utility lines, an alternate location may be determined for it on the site, prior to final occupancy of the proposed residence. TM -2017-02, EA -2017-02, 22561 Alcalde Road April 12, 2018 R-2018-08, R-2018-09, TR -2018-05 Page 4 of 7 Two -Story Permits The project includes two, Two Story Permit, applications for the development of the two new lots (see Attachment 5). The elevations, building placement, and building sizes that are illustrated are compatible with the existing neighborhood and consistent with the development standards in Cupertino Municipal Code Chapter 19.28: Single -Family Residential (R-1) Zones and the R1-7.5 zone. No design review is required for the proposed two story homes. Although not mandated to, the applicant has proposed to add privacy plantings in the rear of the lot of both proposed parcels (adjoining the existing duplexes.) Further, the replacement tree for the 37" Coast Live Oak to be removed (discussed previously) is proposed to be the required front yard tree (36 -inch box Coast Live Oak) for Parcel B. Environmental Review A Draft Initial Study and Mitigated Negative Declaration (IS/MND) has been prepared for the project (see Attachment 6) per the California Environmental Quality Act (CEQA.) The Notice of Intent (NOI) to adopt a Mitigated Negative Declaration (MND) was placed in the newspaper and mailed to notify neighbors and interested parties that a Draft IS/MND has been prepared in accordance with the California Environmental Quality Act (CEQA) and available for review. The public comment period to receive comments on the Draft MND was between February 1, 2018 and February 21, 2018. The IS/MND identifies mitigation measures in the following areas, which have been added as conditions of approval_ to the draft resolutions, to reduce the potential environmental impacts of the project to less than significant levels: Biological Resources: Nesting surveys consistent with the federal Migratory Bird Treaty Act and the California Department of Fish and Game Code are required. ® Hazards and Hazardous Materials: Prior to the issuance of the demolition permit, an Asbestos and Lead assessment study will be conducted. Soil mediation measures will be employed to reduce the pesticide and other soil contaminate levels as identified in the soils report. Soil Remediation: Phase I and Phase II environment assessments and additional reports indicated elevated levels of lead, arsenic, and pesticides where samples were taken from the site. The reports conclude these are most likely attributable to prior agricultural and gardening uses. Since this contamination can lead to adverse impacts if not corrected, the site must be remediated by removing and disposing the impacted soil as prescribed by County of Santa Clara Environmental Health Department and TM -2017-02, EA -2017-02, 22561 Alcalde Road April 12, 2018 R-2018-08, R-2018-09, TR -2018-05 Page 5 of 7 Soil Remediation Plan. A condition of approval has been added to require this prior to any demolition or site disturbance activities. On March 1, 2018, the Environmental Review Committee (ERC) recommended that the approval authority find that the IS/MND for the project has been prepared in compliance with CEQA and adopt the IS/MND and the Mitigation Monitoring and Reporting Program (MMRP.) Other Department/Agency Rview_ The City's Public Works Department and Cupertino Sanitary have reviewed the project and have no objections. Their conditions have been incorporated as conditions of approval in the draft resolutions. In compliance with the Subdivision Map Act requirements, notices have been sent to the two school districts that will serve the new parcels. However, no comments have been received on the project as of the date of production of this staff report. The applicant will be required to pay the appropriate school impact fees upon development of the lots with homes. Public Noticing and Outreach The following table is a brief summary of the noticing done for this project: ■ One site sign posted on the site (at least 10 days prior to hearing) ■ Legal ad placed in the newspaper (at least 10 days prior to hearing) ■ 49 notices mailed to property owners within 300' of project site (10 days prior to hearing) ■ Posted on the City's official notice bulletin board (one week prior to hearing) ■ Posted on the City of Cupertino's Web site (one week to As of the production of this report, staff has received comments from two neighboring residents. Staff received comments from two neighbors (see Attachment 7.) Their concerns and Staff responses are summarized below: ■ The construction activities from the development of the parcels will be an ongoing impact to the neighboring residents: Construction related impacts to neighboring residents generated by truck traffic, noise, parking, and dust are acknowledged and regulated throughout the City of Cupertino"s Municipal Code, particularly within Title 10: Public Peace, Safety, and Morals. Further, the project is conditioned to submit a TM -2017-02, EA -2017-02, 22561 Alcalde Road R-2018-08, R-2018-09, TR -2018-05 Paze 6 of 7 April 12, 2018 Construction Management Plan, Work Schedule, Erosion Control Plan, as well as utilize Best Management Practices, as required by the State Water Resources Control Board. Any violation of the above is considered a code violation subject to enforcement by the City's Code Enforcement officers. ® The road should not be widened as it would encourage unsafe driving conditions and posing a danger to neighboring residents: The road will not be widened but will rather be improved within the existing Public Right -of -Way boundary. The 10' dedication will be added to the existing Public Right -of -Way, accommodating a detached sidewalk, curb and gutter, street trees, and pavement work similar to, the existing off-site improvements in front of 22539 and 22519 Alcalde Road to the east of the project site. Limit the development to a single story and maintain the trees along Alcalde Road: Two story homes are allowed within the R177.5 zone as long as the application adheres. to the prescriptive zoning standards outlined in Cupertino Municipal Code Chapter 19.28: Single -Family Residential (R-1) Zones. The trees located closest to Alcalde Road will be replaced to the satisfaction of the Director of Public Works and shall be of a type approved by the City in accordance with Ordinance No. 125. Permit Streamlining Act: This matter is adjudicatory and. is subject to the Permit Streamlining Act (Government Code Section 65920 — 65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received: October 11, 2017; Deemed ]incomplete: November 8, 2017; Project Resubmitted: January 26, 2018; Deemed Complete: February 1, 2018 The City had 60 days, until, April 1, 2018 to make a decision on the project. However, the applicant has acknowledged the later Hearing date without objection. Conclusion: Staff recommends approval of the Tentative Map, Two Story, and Tree Removal Permits because the project is consistent with the General Plan, subdivision, protected tree, and zoning ordinances, and conforms to the single-family residential development pattern, in accordance with Chapters 14.18, 18.20, and 19.28 of the Cupertino Municipal Code. TM -2017-02, EA -2017-02, 22561 Alcalde Road April 12, 2018 R-2018-08, R-2018-09, TR -2018-05 Page 7 of 7 Next Steas. The Hearing Officer's decision on this project is final unless appealed within 14 calendar days of the decision. The applicant may submit applications for grading and other permits after the appeal period ends and may commence construction activities as soon as the site remediation is complete. The Tentative Map approval expires on April 12, 2020, while the Two Story and Tree Removal Permits expire on April 12, 2019, at which time the applicant may apply for one- year extensions. Prepared by: Gian Paolo Martire, Associate Planner Reviewed and Approved by: Piu Ghosh, Principal Planner Attachments 1— Draft Resolution for EA -2017-03 2 — Draft Resolution for TM -2017-02 3 — Draft Resolution for R-2018-08 & R-2018-09 4 - Draft Resolution for TR -2018-05 5 - Plan set 6 - Initial Study, ERC Recommendation 7 — Public Comment I ,� CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 88 OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO TO ALLOW THE SUBDIVISION OF AN APPROXIMATELY .44 ACRE LOT INTO TWO (2) PARCELS OF APPROXIMATELY 8,892 SQUARE FEET AT 22561 ALCALDE ROAD (APN 342-29-063) SECTION I: PROTECT DESCRIPTION Application No.: TM -2017-02 Applicant: Cindy Hsu Location: 22561 Alcalde Road (APN 342-29-063) SECTION II: FINDINGS WHEREAS, the City of Cupertino received an application to subdivide an approximately .44 acre lot into two (2) parcels of approximately 8,892 square feet; and WHEREAS, prior to the Administrative Hearing the Environmental Review Committee heard the item on March 1, 2018 during which it reviewed the Draft Mitigated Negative Declaration, received public comments, and recommended adoption of a Mitigated Negative Declaration on a 5-0 vote; and WHEREAS, on April 12, 2018 the Administrative Hearing Officer adopted the Initial Study/Draft MND as the Final Initial Study/Mitigated Negative Declaration for the project after adopting all the identified mitigation measures as conditions of approval for the project; and WHEREAS, the necessary notices have been given in accordance with the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held one or more Public Hearings on this matter; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds: Resolution No. 88 TM -2017-02 April 12, 2018 Page -2- a. That the proposed subdivision map is consistent with the City of Cupertino General Plan. The subject property is consistent with the General Plan since the property is permitted to have up to two dwelling units based on its land use designation of Low Density (1-5 DU/Ac.). Additionally, the proposed lots are sized to be comparable to adjacent residential development, and are compatible with the existing neighborhood lot orientation pattern. The lot acreage will be consistent with the underlying single family residential standards proposed with a minimum lot square footage of 7,500 square feet. The proposed subdivision is compatible with the adjoining land uses and no physical constraints are present that would conflict with anticipated land use development. The proposed properties are designed to allow for future passive solar as the lot configurations allow for a structure to be oriented in an east -west alignment for southern exposure. Furthermore the design and improvement of the divided parcel does not result in any reduction in allowable densities or percentage of a lot that may be occupied by a building in providing for future passive solar provisions. b. That the design and improvements of the proposed subdivision are consistent with the General Plan. The off-site improvements proposed with the project are identical to the existing improvements adjacent to the subject site. These are consistent with the City's General Plan policies related to pedestrian safety etc. by separating sidewalks from the street, minimizing curb -cuts and requiring an urban canopy within the public right-of-way. c. That the site is physically suitable for the type development contemplated under the approved subdivision. The proposed subdivision is compatible with the adjoining land uses and no physical constraints are present that would conflict with anticipated land use development. There are no topographical anomalies that differentiate this property from adjacent properties. The site is located on the valley floor and the proposed two lot subdivision is typical of properties in the neighborhood. d. That the site is physically suitable for the intensity of development contemplated under the approved subdivision. The subject property is physically suitable in size and shape in conformance to development standards and is appropriately configured to accommodate reasonably sized single-family dwelling units. e.That the design of the subdivision or the proposed improvements are not likely to cause substantial environmental damage nor substantially and avoidable injure fish and wildlife or their habitat. Resolution No. 88 TM -2017-02 April 12, 2018 Page - 3 - The proposed subdivision design and improvements are not likely to cause serious public health problems nor substantially injure fish and wildlife or their habitat because the property is a developed site and located in an urbanized area where residential land use is allowed. f. That the design of the subdivision or the type of improvements associated therewith are not likely to cause serious public health problems. The proposed development is consistent with the existing adjacent residential development, and the on-site and off-site improvements improve neighborhood walkability through new detached sidewalk construction with size -appropriate driveway cuts and street and private trees planting. g. That the design of the subdivision and its associated improvements will not conflict with easements acquired by the public at large for access through or use of property within the proposed subdivision. No easement or right-of-way exists currently that would be impeded or conflict with the proposed subdivision. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on Page 2 thereof, the application for a Tentative Map, Application no. TM -2017-02, is hereby approved; and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the Public Hearing record concerning Application no. TM -2017-02 as set forth in the Minutes of Administrative Hearing Meeting of April 12, 2018, and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set entitled; "Hsu Residence — Lot A," drawn by HMC Associates, LLC dated August 18, 2017 consisting of sixteen (16) sheets labeled A-1.0 — A-4.0, L-1, TM -1, TH-2, and Boundary & Topographic Map; except as may be amended by conditions in this resolution. 2. ACCURACY OF PROTECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Resolution No. 88 TM -2017-02 April 12, 2018 Page -4 - Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file nos. EA -2017-02, R-2018-08, R-2018-09, and TR -2018-05 shall be applicable to this approval. 4. DEVELOPMENT ALLOCATION The project is granted a development allocation of one unit from the Citywide allocation. 5. BELOW MARKET RATE HOUSING PROGRAM The applicant shall participate in the City's Below Market Rate (BMR) Housing Program by paying the housing mitigation fees as per the Housing Mitigation Manual. These fees will be assessed at the time of Building permit issuance for the net new residential unit and any proposed accessory dwelling units. 6. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS a. All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. b. Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c. Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited toMonday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during the nighttime period as defined in the Municipal Code. d. Construction activities shall be limited to Monday through Friday, 7 a.m. to, o 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities arenot allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of of the Cupertino Municipal Code. e. Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f. The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. Resolution No. 88 TM -2017-02 April 12, 2018 Page - 5 - The applicant shall annotate all permit plans with the above requirements and shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated. 7. CONSTRUCTION MANAGEMENT PLAN Final map improvement plans shall include a construction management plan detailing how construction activities will be conducted. The plan shall address, but not be limited to the following activities: a. Construction staging area (shall not occur within 15 feet of neighboring residential property lines) b. Construction schedule and hours c. Construction phasing plan, if any d. Contractor parking area e. Tree preservation/protection plan f. Site dust, noise and storm run-off management plan g. Emergency/complaint and construction site manager contacts 8. DEMOLITION OF STRUCTURES ]prior to recordation of the final map, the applicant shall demolish and remove all structures on the property. All demolished buildings and site materials shall be recycled to the maximum extent feasible subject to the Building.Official. The applicant shall provide evidence that materials will be recycled prior to issuance of demolition permit. 9. GREEN BUILDING The City recommends that the applicant incorporate green building measures into the project. The green building measures may include but not be limited to: low VOC paints, maximizing recycled building materials, solar efficiency/energy, energy efficient windows/ appliances/mechanical equipment, maximizing onsite water retention, and draught tolerant and pest resistant landscaping. 10. FENCES All fencing on the site shall comply with Cupertino Municipal Code Chapter 19.48 Fences. 11. LANDSCAPE PROTECT SUBMITTAL Prior to issuance of building permits, the applicant shall submit a landscape project submittal per sections 14.15.040 or 14.15.050 of the Landscaping Ordinance if more than 500 square feet of landscaping area is proposed. The Water -Efficient Design Checklist (Appendix A of Chapter 14.15), Landscape and Irrigation Design Plans, and Resolution No. 88 TM -2017-02 April 12, 2018 Page - 6 - Water Budget Calculations shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits. 12. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible for consulting with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 13. EXPIRATION The approval or conditional approval of the Tentative Map Subdivision shall expire twenty four (24) months from the date of Administrative Hearing approval. An extension or extensions may be approved as provided in Section 18.20.080. 14. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively,, the "indemnified parties") from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys' fees and costs within 30 days following receipt of invoices from City. Such attorneys' fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 15. NOTICE OF FEES DEDICATIONS RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 -day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. Resolution No. 88 TM -2017-02 April 12, 2018 Page - 7 - SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPT. 1. TRAFFIC IMPACT FEES The Project will be subject to pay Traffic Impact Fees. The fee is $6,025 per new AM or PM peak -hour trip generated by the Project prior to issuance of grading permits. 2. PARCEL MAP Prior to approval of the Building permit, a Parcel Map will be required to be recorded with the County Recorders, County of Santa Clara. Show any existing easements on the map. 3. STREET IMPROVEMENTS & DEDICATION Provide a street dedication in fee title and frontage improvements along the project to the satisfaction of the Director of Public Works. Dedication shall be the full half -street width, as indicated in the title report; prior to recordation of final reap. Street improvements may include, but not be limited to, installation of new detached sidewalk, driveways, curb & gutter, new pavement up to centerline, street trees, underground overhead utilities, and relocation of utility pole and utility boxes. 4. STREET LIGHTING INSTALLATION Street lighting shall be installed and shall be as approved by the Director of Public Works. Lighting fixtures shall be positioned so as to preclude glare and other forms of visual interference to adjoining properties, and shall be no higher than the maximum height permitted by the zone in which the site is located. 5. GRADING & DRAINAGE Grading shall be as approved and required by the Director of Public Works in accordance with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits- maybe required. Please contact Army Corp of Engineers and/or Regional Water Quality Control Board as appropriate. Any storm water overflows or surface sheeting should be directed away from neighboring private properties and to the public right of way as much as reasonably possible. 6. C.3 REQUIREMENTS IREMENTS C.3 regulated improvements may be required for projects creating and/or replacing 10,000 S.F. or more of impervious surface (collectively over the entire project site). The developer shall reserve a minimum of 4% of developable surface area for the Resolution No. 88 TM -2017-02 April 12, 2018 Page - 8 - placement of low impact development measures, for storm water treatment, unless an alternative storm water treatment plan, that satisfies C.3 requirements, is approved by the Director of Public Works. The developer must include the use and maintenance of site design, source control and storm water treatment Best Management Practices (BMPs), which must be designed per approved numeric sizing criteria. A Storm Water Management Plan, Storm Water Facilities .Easement Agreement, Storm Water Facilities Operation and Maintenance. Agreement, and certification of ongoing operation and maintenance of treatment BMPs are each required. 7. IMPROVEMENT AGREEMENT The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for under grounding of utilities. Said agreement shall be executed prior to issuance of construction permits Fees: a. Checking & Inspection Fees: Per current fee schedule ($3,648.00 or 5% of improvement costs) b. Grading Permit: Per current fee schedule ($2,825.00 or 6% of improvement costs) c. Development Maintenance Deposit: $1,000.00 d. Storm Drainage Fee: Per current fee schedule ($4,550 per AC) e. Traffic Impact Fee $6,025 per new peak -hour trip generated (1 peak hour trip being generated with current site plan). f. Power Cost: g. Parcel Map Fees: Per current fee schedule ($5,527.90) h. Park Fees: Per current fee schedule ($84,000 per new unit) i. Street Tree Fees: Per current fee schedule ($386.84 per tree) ** Based on the latest effective PG&E rate schedule approved by the PUC Bonds: Faithful Performance Bond: 100% of Off-site and On-site Improvements Labor & Material Bond: 100% of Off-site and On-site Improvement Resolution No. 88 TM -2017-02 April 12, 2018 Page - 9 - On-site Grading Bond: 100% of site improvements. -The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. 8. UNDERGROUND UTILITIES Developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate with affected utility providers for installation of underground utility devices. Developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the Director of Public Works. 9. WATER BACKFLOW PREVENTERS Domestic and Fire Water Backflow preventers and similar above ground equipment shall be placed away from the public right of way and site driveways to a location approved by the Cupertino Planning Department, Santa Clara County Fire Department and the water company. 10. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMPs), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in grading and street improvement plans. 11. EROSION CONTROL PLAN Developer must provide an approved erosion control plan by a Registered Civil Engineer. This plan should include all erosion control measures used to retain materials on site. Erosion control notes shall be stated on the plans. 12. WORK SCHEDULE Every 6 months, the developer shall submit a work schedule to the City to show the timetable for all grading/erosion control work in conjunction with this project. Resolution No. 88 TM -2017-02 April 12, 2018 Page -10 - 13. STREET TREES Street trees shall be planted within the Public Right of Way to the satisfaction of the Director of Public Works and shall be of a type approved by the City in accordance with Ordinance No. 125. 14. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City. 15. SANTA CLARA COUNTY FIRE DEPARTMENT A letter of clearance for the project shall be obtained from the Santa Clara County Fire Department prior to issuance of building permits. Clearance should include written approval of the location of any proposed Fire Backflow Preventers, Fire Department Connections and Fire Hydrants (typically Backflow Preventers should be located on private property adjacent to the public right of way, and fire department connections must be located within 100' of a Fire Hydrant). 16. SAN TOSE WATER COMPANY CLEARANCE Provide San Jose Water Company approval for water connection, service capability and location and layout of water lines and backflow preventers before issuance of a building permit approval. 17. DEDICATION OF UNDERGROUND WATER RIGHTS Developer shall "quit claim" to the City all rights to pump, take or otherwise extract water from the underground basin or any underground strata in the Santa Clara Valley. 18. SANITARY DISTRICT A letter of clearance for the project shall be obtained from the Cupertino Sanitary District prior to issuance of building permits. 19. UTILITY EASEMENTS Clearance approvals from the agencies with easements on the property (including PG&E, AT&T, and California Water Company, and/or equivalent agencies) will be required prior to issuance of building permits. SECTION V: CONDITIONS ADMINISTERED BY CUPERTINO SANITARY 1. CONNECTION PERMIT FEES Connection permit fees, lateral disconnection fees, frontage fees, and acreage fees will be required for the proposed lots during the Building Permit Phase. Resolution No. 88 TM -2017-02 April 12, 2018 Page -11- 2. LATERAL & SEWER LINE CLEANOUT Each lot shall have their own newly installed lateral and property line cleanout per District's standards. CITY ENGINEER'S CERTIFICATE OF ACCEPTANCE OF ENGINEERING/ SURVEYING CONDITIONS (Section 66474.18 California Government Code) I hereby certify that the engineering and surveying conditions specified in Section IV. of this Resolution conform to generally accepted engineering practices. /s/Timm Borden Timm Borden, Director of Public Works City Engineer CA License 45512 PASSED AND ADOPTED this 12th day of April, 2018 at a noticed Public Hearing of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: /s/Gian Paolo Martire Gian Paolo Martire Associate Planner APPROVED: /s/BeW aurin Fu Benjamin Fu Asst. Director of Community Development CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 89 OF THE ADMINSTRATIVE HEARING OFFICER OF THE CITY. OF CUPERTINO ADOPTING A MITIGATED NEGATIVE DECLARATION AND MITIGATION MONITORING AND REPORTING PROGRAM TO SUBDIVIDE AN APPROXIMATELY 0.44 -ACRE LOT INTO TWO (2) PARCELS OF APPROXIMATELY 8,892 SQUARE FEET AT 22561 ALCALDE ROAD (APN 342-29-063) SECTION I: PROTECT DESCRIPTION Application No: EA -2017-02 Applicant: Cindy Hsu Location: 22561 Alcalde Road (APN: 342-29-063) SECTION II: ENVIRONMENTAL REVIEW PROCESS WHEREAS, the City of Cupertino received an application to subdivide an approximately 0.44 -acre lot into two (2) equal parcels of approximately 8,892 square feet; and WHEREAS, pursuant to the provisions of the California Environmental Quality Act of 1970. (Public Resources Code Section 21000 et seq.) ("CEQA") together with the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.) (hereinafter, "CEQA Guidelines"), the City prepared an Initial Study and proposed Mitigated Negative Declaration for the Project ("IS/MND"); and WHEREAS, the Project is additionally described in the January 2018 "Alcalde Road Lot Split Project" Draft Initial Study/Mitigated Negative Declaration ("Draft IS/MND"); and WHEREAS, on February 1, 2018 the City issued a Notice of Intent to Adopt a Mitigated Negative Declaration; and WHEREAS, on February 1, 2018 the Draft IS/MND for the project was distributed to responsible agencies and the public for review and comment for a 20 -day period that ended February 21, 2018; and WHEREAS, the IS/MND concluded that significant environmental effects on Biological Resources, and Hazards and Hazardous Materials would be avoided or reduced to less - than -significant levels by mitigation measures ("MM") identified in the IS/MND; and Resolution No. 89 EA -2017-02 April 12, 2018 Page -2 WHEREAS, On March 1, 2018, prior to making any recommendations regarding the adoption of the Draft IS/MND, the City of Cupertino's Environmental Review Committee held a duly noticed public hearing to receive public testimony where it reviewed and considered the information contained in the Draft IS/MND, voted 5-0-0 to recommend that the Hearing Officer adopt the Draft IS/MND (EA -2017-02) and mitigation measures; and WHEREAS, the Administrative Officer has independently reviewed and considered the IS/MND prior to taking action on the Project; WHEREAS, on April 12, 2018 prior to taking action on the Project, the Administrative Officer held a duly noticed public hearing to receive staff's presentation and public testimony, and to further consider the information contained in the Final IS/MND, along with all staff reports, other ,pertinent documents, and all written and oral statements received prior to and at the public hearing. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony, staff reports, public comments, and other evidence submitted in this matter, the Administrative Officer: 1. Finds that the Final IS/MND for the Project has been completed in compliance with the CEQA and reflects the independent judgment and analysis of the City. 2. Finds that, on the basis of the whole record before it, there is no substantial evidence that the Project as proposed and mitigated will have a significant effect on the environment. 3. Adopts the Final Mitigated Negative Declaration (Final MND) for the Project. 4. Adopts the Mitigation Monitoring and Reporting Program for the Project, attached hereto as Exhibit 1, and incorporated herein by reference, which incorporates all the mitigation measures required under the Final MND. The Administrative Officer further makes the mitigation measures required conditions of approval of the Project to the extent they are within the responsibility and jurisdiction of the City as summarized below: a. BIOLOGICAL RESOURCES MITIGATION MEASURES MM IV -1: A pre -construction survey for nesting birds shall be conducted for the project site and a 250 -foot radius around the project site by a qualified biologist not more than two weeks prior to site disturbance during the breeding season (February 1 to August 31). If site disturbance commences outside the breeding season, a pre - construction survey for nesting birds are not required. If active nests of migratory Resolution No. 89 EA -2017-02 April 12, 2018 Page -3 birds are not detected within approximately 250 feet of the project site, further mitigation is not required. Results of the survey shall be submitted to the Community Development Department. If nesting raptors or other migratory birds are detected on or within 250 feet of the site during the survey, a suitable construction -free buffer shall be established around all active nests. The dimensions of the buffer shall be a minimum of 75 feet for passerine birds and 250 feet for raptors. The buffer size may vary depending on location and species. The buffer areas shall be enclosed with temporary fencing, and construction equipment and workers" shall not enter the enclosed setback areas. Buffers shall remain in place for the duration of the breeding season or until a qualified biologist has confirmed that all chicks have fledged and are independent of their parents. b. HAZARDS AND HAZARDOUS MATERIALS MITIGATI®N MEASURES MM V111-1: Prior to issuance of any grading permits, the following measures shall be reflected on the project grading and foundation plans, subject to review and approval by the City Engineer: ® Six inches of soil shall be removed within the proposed landscape areas along the northern and western boundaries of the project site. The aforementioned landscape areas shall subsequently be capped with a minimum of 0.5 feet of clean imported fill. ® The top six inches of soils removed within the ' aforementioned landscape ureas shall be off -hauled by a licensed hazardous waste contractor (Class A) and contractor personnel that have completed 40 -hour ®SHA hazardous training, and shall be disposed of appropriately in accordance with applicable federal, State, and local regulations associated with hazardous waste. The project applicant shall provide proof of implementation of the above measures to the Community Development Department. MM XVIII -2: After demolition and removal of on-site structures and hardscapes, but prior to initiation of grading, the applicant shall conduct additional soil sampling within the previously inaccessible on-site areas to determine if the underlying soils contain contaminants in excess of the applicable Environmental Screening Levels (ESLs) set by the Regional Water Quality Control Board. The results of soil Resolution No. 89 EA -2017-02 April 12, 2018 Page -4 -- sampling shall be submitted to the Community Development Department prior to initiation of grading. If contaminants are not detected above applicable ESLs, then further mitigation is not required. If contaminants are detected above the applicable ESLs, then the soils shall be remediated by off -hauling to a licensed landfill facility. MM VIII -3o Prior to issuance of a demolition permit for any on-site structures, the project applicant_ shall consult with certified Asbestos and/or Lead Risk Assessors to complete and submit for review to the Community Development Department an asbestos and lead survey. If asbestos -containing materials or lead -containing materials are not discovered during the survey, further mitigation related to asbestos -containing materials or lead containing materials shall not be required. If asbestos -containing materials and/or lead -containing materials are discovered by the survey, the project applicant shall prepare a work plan to demonstrate how the on-site asbestos -containing materials and/or lead -containing materials shall be removed in accordance with current California Occupational Health and Safety (Cal -OSHA) Administration regulations and disposed of in accordance with all CalEPA regulations, prior to the demolition and/or removal of the on-site structures. The plan shall include the requirement that work shall be conducted by a Cal -OSHA registered asbestos and lead abatement contractor in accordance with Title 8 CCR 1529 and Title 8 CCR 1532.1 regarding asbestos and lead training, engineering controls, and certifications. The applicant shall submit the work plan to the Community Development Department for review and approval. Materials containing more than one (1) percent asbestos that is friable are also subject to BAAQMMD regulations. Removal of materials containing more than one (1) percent friable asbestos shall be completed in accordance with BAAQMD Section 11-2-303. PASSED AND ADOPTED this 12th day of April, 2018 at a noticed Public Hearing of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: /s/Gian Paolo Martire /s/Benjamin Fu Gian Paolo Martire Benjamin Fu Associate Planner Asst. Director of Community Development Exhibit EA -1 r � t t 1 1 ® ! I A I i 22561 Alcalde Road . (APN 341-29-063) Impact Mitigation Measure Timeframe and Responsibility for Implementation Method of Compliance Oversight of Implementation BIOLOGICAL RESOURCES IMPACT A - BI® MM IST -1: If construction If grading and/or tree Director of Have a substantial A pre -construction survey for nesting activities and any removal begins during the Community adverse effect, either birds shall be conducted for the project required tree, removal stated dates in the Development directly or through site and a 250 -foot radius around the occur during the mitigation measure, a final habitat modifications, project site by a qualified biologist not breeding season report of nesting birds, on : any species more than two weeks prior to site (February 1 and including any protection identified as a disturbance during the breeding August 31), a qualified measures, shall be candidate, sensitive, season (February 1 to August 31). If site biologist (hired by the submitted to the Director of or special status disturbance commences outside the Project proponent) Community Development species in local or breeding season, a pre -construction shall conduct surveys prior to the start of regional plans, survey for nesting birds are not prior to tree removal demolition and/or any policies, or required. If active nests of migratory or construction construction activity, regulations, or by the birds are not detected within activities. including grading. California approximately 250 feet of the project Department of Fish site, further mitigation is not required. Preconstruction and Game or U.S. Fish Results of the survey shall be surveys are not and Wildlife Service? submitted to the Community required for tree Development Department. removal or construction activities If nesting raptors or other migratory outside the nesting birds are detected on or within 250 feet period. of the site during the survey, a suitable construction -free buffer shall be established around all active nests. The dimensions of the buffer shall be a minimum of 75 feet for passerine birds and 250 feet for raptors. The buffer size may vary depending. on location and species. The bufferareas shall be enclosed' with temporary fencing, and. Impact Mitigation Measure Timeframe and Method of Compliance Oversight of ][responsibility for Implementation Implementation construction equipment and workers shall not enter the enclosed setback areas. Buffers shall remain in place for the duration of the breeding season or until a qualified biologist has confirmed that all chicks have fledged and are independent of their parents. HAZARDS AND HAZARDOUS MATERIA .LS IMPACT B — HAZ 1M[1M[ DTIII -1: Prior to issuance of The City Engineer shall Director of Create a significant Prior to issuance of any grading any grading permits, review all project grading Community hazard to the public or permits, the following measures shall the applicant shall and foundation plans for Development and the environment be reflected on the project grading and note the required the noted measures prior to City Engineer through reasonably foundation plans, subject to review and measures on all issuance of any grading foreseeable upset and approval by the City Engineer: grading and permits. accident conditions foundation plans. involving the likely Six inches of soil shall be Proof of implementation of release of hazardous., removed within the proposed The required measures the measures shall be materials into the landscape areas along the shall be conducted by provided to the environment? northern and western a licensed hazardous Community Development boundaries of the project site. waste contractor Department upon The aforementioned landscape (Class A) and completion. areas shall subsequently be contractor personnel capped with a minimum of 0.5 that have completed feet of clean imported fill. 40 -hour OSHA ® The top six inches of soils hazardous training. removed within the aforementioned landscape areas shall beoff-hauled by a licensed hazardous _ waste contractor (Class A) and contractor personnel, that have Impact Mitigation Measure Timeframe and Responsibility for Implementation Method of Compliance Oversight of Implementation completed 40 -hour OSHA hazardous training, and shall be disposed of appropriately in accordance with applicable federal, State, and local regulations associated with hazardous waste. The project applicant shall provide proof of implementation of the above measures to the Community Development Department. MM VIII -2: After demolition and The results of soil sampling Director of After demolition and removal of on- removal of on-site shall be submitted to the Community site structures and hardscapes, but structures and Community Development Development prior to initiation of grading, the hardscapes, but prior Department prior to applicant shall conduct additional soil to initiation of initiation of grading. sampling within the previously grading, the applicant inaccessible on-site areas to determine shall have additional if the underlying soils contain soil sampling contaminants in excess of the conducted. applicable Environmental Screening Levels (ESLs) set by the Regional Water Quality Control Board. The results of soil sampling shall be submitted to the Community Development Department prior to initiation of grading. If _. contaminants are not detected above applicable ESLs, then further mitigation is ' not required. If contaminants are detected above the. Impact Mitigation Measure 'Timeframe and Responsibility for Implementation Method of Compliance Oversight of Implementation applicable ESLs, then the soils shall be remediated by off -hauling to a licensed landfill facility. MM DTIII -3: Prior to issuance of a Results of the asbestos and Director of Prior to issuance of a demolition permit demolition permit, a lead survey shall be Community for any on-site, structures, the project certified Asbestos submitted for review to the Development, applicant shall consult with certified and/or Lead Risk Community Development BAAQMD: Asbestos, Asbestos and/or Lead Risk Assessors to Assessor shall Department prior to Compliance & complete and submit for review to the complete an asbestos issuance of grading and/or Enforcement Community Development Department and lead survey of the demolition permits. an asbestos and lead survey. If existing structures. If asbestos -containing materials or lead- asbestos -containing If a work plan is required containing materials are not discovered materials and/or lead- for the removal of asbestos - during the survey, further mitigation containing materials or lead -containing related to asbestos -containing are discovered, the materials, the applicant materials or lead containing materials project applicant shall shall submit such work shall not be required. If asbestos- prepare a work plan to plan to the Community containing materials and/or lead- demonstrate that Development Department containing materials are discovered by removal of the for review and approval the survey, the project applicant shall asbestos or lead- prior to issuance of prepare a work plan to demonstrate containing materials grading and/or demolition how the on-site asbestos -containing shall be conducted in permits. materials and/or lead -containing compliance with Cal - materials shallbe removed in OSHA and CaIEPA Should materials accordance with current California regulations. containing more than one Occupational Health and Safety (Cal- percent asbestos that is OSHA) Administration regulations friable be identified in the and disposed of in accordance with all survey, the work plan for CalEPA regulations, prior to: the removal shall be prepared demolition and/or removal of the on- in compliance with site structures. The plan shall include BAAQMD regulations and Impact Mitigation Measure Timeframe and Responsibility for Implementation Method of Compliance . Oversight of Implementation the requirement that work shall be submitted to BAAQMD for conducted by a Cal -OSHA registered review prior to issuance of asbestos and lead abatement contractor grading and/or demolition in accordance with Title 8 CCR 1529 permits. and Title 8 CCR 1532.1 regarding asbestos and lead training, engineering controls, and certifications. The applicant shall submit the work plan to the Community Development Department for review and approval. Materials containing more than one (1) percent asbestos that is friable are also subject to BAAQMD regulations. Removal of materials containing more than one (1) percent friable asbestos shall be completed in accordance with BAAQMD Section 11-2-303. CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 90 OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO TO ALLOW FOR THE CONSTRUCTION OF TWO 3,998 SQUARE FEET TWO-STORY SINGLE FAMILY RESIDENCES ON TWO NEWLY CREATED LOTS AT 22561 ALCALDE ROAD (APN 342-29-063) SECTION I: PROTECT DESCRIPTION Application No.: R-2018-08, R-2018-09 Applicant: Cindy Hsu Location: 22561 Alcalde Road (APN: 342-29-063) SECTION II: FINDINGS FOR A TWO-STORY PERMIT: WHEREAS, the City of Cupertino received an application for Two -Story Permits as described in Section I of this Resolution; and WHEREAS, prior to the Administrative Hearing, the Environmental Review Committee heard the item on March 1, 2018 during which it reviewed the Draft Mitigated Negative Declaration, received public comments, and recommended adoption of a Mitigated Negative Declaration on a 5-0 vote; and WHEREAS, on April 12, 2018 the Administrative Hearing Officer adopted the Initial Study/Draft MND as the Final Initial Study/Mitigated Negative Declaration for the project after adopting all the identified mitigation measures as conditions of approval for the project; and WHEREAS, the necessary notices have been given in accordance with the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held one or more Public Hearings on this matter; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officer finds: Resolution No. 90 R-2018-08, R-2018-09 April 12, 2018 Page - 2 - a) The project is consistent with the Cupertino General Plan, any applicable specific plans, zoning ordinance and the purposes of this title. The proposed project is consistent with the General Plan as the project is within the Low Residential (1-5 DU/acre) land use area. There are no applicable specific plans that affect the project. The project has been found to be consistent with the requirements of Cupertino Municipal Code Chapter 19.28 Single Family (R-1) Residential. b) The granting of the permit will not result in a condition that is detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety or welfare. The granting of the permit will not result in a condition that is detrimental or injurious to property improvements in the vicinity, and will not be detrimental to the public health, safety or welfare as the project is located within the R1-7.5 (Single Family Residential) zoning district, and will be compatible with the surrounding uses of the neighborhood. c) The proposed project is harmonious in scale and design with the general neighborhood. The proposed project is located in a residential area consisting of .single family homes. The proposed project maintains the single family home scale found compatible with the general neighborhood. d) Adverse visual impacts on adjoining properties have been reasonably mitigated. Any potential adverse impacts on adjoining properties have been reasonably mitigated through the installation of privacy protection plantings and front yard trees as required. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on Page 2 thereof, the application for Two -Story Permits, Application nos. R-2018-08 and R-2018-09, is hereby approved; and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the Public Hearing record concerning Application nos. R-2018-08 and R-2018-09 as set forth in the Minutes of Administrative Hearing Meeting of April 12, 2018, and are incorporated by reference as though fully set forth herein. Resolution No. 90 R-2018-08, R-2018-09 April 12, 2018 Page -4 - submitted to the Community Development Department prior to final occupancy of the residence. 7. LANDSCAPE PROTECT SUBMITTAL Prior to issuance of building permits, the applicant shall submit a landscape project submittal per sections 14.15.040 or 14.15.050 of the Landscaping Ordinance if more than 500 square feet of landscaping area is proposed. The Water -Efficient Design Checklist (Appendix A of Chapter 14.15), Landscape and Irrigation Design Plans, and Water Budget Calculations shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits. 8. LANDSCAPE INSTALLATION REPORT The project is subject to all provisions delineated in the Landscape Ordinance (CMC, Chapter 14.15). A landscape installation audit shall be conducted by a certified landscape professional after the landscaping " and irrigation system have been installed. The findings of the assessment shall be consolidated into a landscape installation report. The landscape installation report shall include, but is not limited to: inspection to confirm that the landscaping and irrigation system are installed as specified in the landscape and irrigation design plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off . that causes overland flow; and preparation of an irrigation schedule. The landscape installation report shall include the following statement: "The landscape and irrigation system have been installed as specified in the landscape and irrigation design . plan and complies with the criteria of the ordinance and the permit." 9. LANDSCAPE AND IRRIGATION MAINTENANCE Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be established and submitted to, the Director of Community Development or his/her designee, either with the landscape application package, with the landscape installation report, or any time before the landscape installation report is submitted. a) Schedules should take into account water requirements for the plant establishment period and water requirements for established landscapes. b) Maintenance shall include, but not be limited to the following: routine inspection; pressure testing, adjustment and repair of the irrigation system; aerating and de - thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of failed plants; weeding; pest control; and removing obstructions to emission devices. Resolution No. 90 R-2018-08, R-2018-09 April 12, 2018 Page 5 - c) Failed plants shall be replaced with the same or functionally equivalent plants that may be size -adjusted as appropriate for the stage of growth of the overall installation. Failing plants shall either be replaced or be revived through appropriate adjustments in water, nutrients, pest control or other factors as recommended by a landscaping professional. 10. EXTERIOR BUILDING MATERIALS/TREATMENTS Final building exterior treatment plan (including but not limited to details on exterior color, material, architectural treatments and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The final building exterior plan shall closely resemble the details shown on the original approved plans. Any exterior changes determined to be substantial by the Director of Community Development shall require a minor modification approval with neighborhood input. 11. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 12. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the "indemnified parties') from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys' fees and costs within 30 days following receipt of invoices from City. Such attorneys' fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 13. NOTICE OF FEES; DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of Resolution No. 90 R-2018-08, R-2018-09 April 12, 2018 Page - 6 - a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 -day period complying with all of the requirements of Section 66020, you will be legally,barred from later challenging such exactions. PASSED AND ADOPTED this 12th day of April, 2018 at a noticed Public Hearing of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: /s/Gian Paolo Martire Gian Paolo Martire Associate Planner APPROVED: /s/Benjamin Fu Benjamin Fu Asst. Director of Community Development CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 91 OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO TO ALLOW THE REMOVAL AND REPLACEMENT OF A PROTECTED 37" COAST LIVE OAK TREE TO FACILITATE THE CONSTRUCTION OF A NEW SINGLE FAMILY HOME AT 22561 ALCALDE ROAD (APN 342-29-063) SECTION I• PROTECT DESCRIPTION Application No.: TR -2018-05 Applicant: Cindy Hsu Location: 22561 Alcalde Road (APN 342-29-063) SECTION II: FINDINGS WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an application for a Tree Removal Permit as described in Section I of this Resolution; and WHEREAS, prior to the Administrative Hearing, the Environmental Review Committee heard the item on March 1, 2018 during which it reviewed the Draft Mitigated Negative Declaration, received public comments, and recommended adoption of a Mitigated Negative Declaration on a 5-0 vote; and WHEREAS, on April ,12, 2018 the Administrative Hearing Officer adopted the Initial Study/Draft MND as the Final Initial Study/Mitigated Negative Declaration for the project after adopting all the identified mitigation measures as conditions of approval for the project; and WHEREAS, the necessary notices have been given in accordance with the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held one or more Public Hearings on this matter; and WHEREAS, the applicant has met the burden of proof required to support said application; and Resolution No. 91 TR -2018-05 April 12, 2018 Page 2 WHEREAS, the Administrative Hearing. Officer finds: 1. That the location of the trees restricts the economic enjoyment of the property by severely limiting the use of property in a manner not typically experienced by owners of similarly zoned and situated property, and the applicant has demonstrated to the satisfaction of the approval authority that there are no reasonable alternatives to preserve the tree(s); The 37" Coast Live Oak at its location on the newly formed lot (Lot B) is situated in a location on the parcel that would severely restrict a reasonably sized home, as compared to the surrounding neighborhood, f om being built. The City's Municipal Code allows removal of such trees as long as appropriate replacements are planted. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, the Application No. TR -2018-05, is hereby approved; and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the public hearing record concerning Application TR -2018-05 as set forth in the Minutes of the Administrative Hearing Meeting of April 12, 2018, and are incorporated by reference herein. .SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the arborist report entitled, "Arborist Report, Evaluation of a Coast Live Oak Tree at: 22561 Alcalde Road, Cupertino," prepared by Kurt Fouts (#WE -0681A), dated February 8, 2018 consisting of eleven (11) sheets inclusive of a landscape plan; except as may be amended by conditions in this resolution. 2. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file nos. TM -2017-02 (EA -2017-02), R- 2018-08, and R-2018-09, shall be applicable to this approval. 3. TREE REPLACEMENT SIZE AND LOCATION The applicant shall plant, at a minimum, a 36 -inch box Coast Live Oak tree in the front yard of Lot B to the satisfaction of the City, in consultation with the City's arborist for the tree proposed to be removed in conformance to the replacement guidelines per Cupertino Municipal Code Section 14.18.160. The size of the Resolution No. 91 TR -2018-05 April 12, 2018 Page 3 proposed replacement trees shall be consistent with the City's Protected Tree Ordinance unless deemed infeasible by the City's Consulting Arborist: a. Diameter of trunk size of removed tree up to 12 inches shall be replaced with one 24 -inch box tree; b. Over 12 inches and up to 36 inches shall be replaced by two 24 -inch box tree or one 36 -inch box tree; and c. Over 36 inches shall be replaced with one 36 -inch box tree. If it is determined that it is physically not feasible to plant the required replacements trees, the Applicant may pay in -lieu fees determined to be appropriate by the Community Development Director. 4. ARBORIST REVIEW Prior to building permit issuance, the number, location and species of trees shall be reviewed and approved by the City in consultation with the City's Arborist. The replacement trees shall be planted prior to building permit final. The Applicant shall provide the Department of Community Development adequate documentation, including, but not limited to, photographs, receipts or invoices, to verify that replacements have been planted. The City's consulting arborist shall inspect the trees after planting and a report ascertaining the good, health of the trees mentioned above shall be provided prior to issuance of final occupancy. 5. PROTECTED TREES The applicant understands that the replacement trees may not be removed without a Tree Removal Permit and that they shall be responsible for ensuring the proper maintenance and care of the trees. The applicant shall also disclose the location and species of all replacements trees on site upon sale of the property. 6. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the "indemnified parties") from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys' fees and costs within 30 days following receipt of invoices from City. Such attorneys' fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff Resolution No. 91 TR -2018-05 April 12, 2018 Page 4 overhead costs and any costs directly related to the litigation reasonably incurred by City. 7. NOTICE OF FEES DEDICATIONS RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 -day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 12th day of April, 2018 at a noticed Public Hearing of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: /s/Gian Paolo Martire Gian Paolo Martire Associate Planner APPROVED: /s/Benjamin Fu Benjamin Fu Asst. Director of Community Development IIrLIORU REM BENC E QL07 A� 22561 ALC ALDE RDD CUFERCrmao CA. 95014 DRAWING INDEX A-1.0 SITE /LANDSCAPE PLAN A-1.1 DEMOLITION PLAN A-2.0 FLOOR PLANS A-3.0 ELEVATIONS A-4.0 SECTIONS & ROOF C-0.0 SURVEY MAP SCOPE OF WORKS: 1. DEMOLRION UNDER SEPARATE PERMR. 2. PROPOSED A NEW TWO STORY SINGLE FAMILY DWELLING W/ ATTACHED GARAGE 3. OBTAIN J NUMBER FROM THE BAAOMD FOR DEMOLITION OF EX. BLDG PROJECT DATA: 1. LOT SIZE: 8,892 S.F. APN 342-29-063 2. ZONING: 131-7.5, (2ND FLOOR SET BACK: 15ft MIN.) 3. CONSTRUCTION TYPE: V -BTW/ FULL FIRE SPRINKLER) OCCUPANCY GROUP: R-3.0 (2 STORY BLDG) 4. BLDG CODES: 2016 California Residential Codes 5. BLDG AREA: 2ND FL. AREA: 1,227.0 SFA 1 ST FL. AREA: 2,298.0 SF. (B) GARAGE AREA 472.5 SF (C) TOTAL BLDG AREA: 3,997.5 SF (FRONT PORCH)104+(REAR PORCH)375 SF+264(CARPORT)=743 SF(E) 1ST FL. 24" EAVE AREA 535 S.F. (F 6, 2ND FL. TO 1ST FL. AREA RATIO: A/(B+C)=44.29% 7, LOT COVERAGE : (B+C+E+F) 4048.5/ 8,892 = 45.53% B. FAR: 3997.5 / 8,892 = 44.96% 9. FRONT YARD IMPERVIOUS AREA RATIO: 30.87% (SEE SHEET A1.1 FOR DETAILS) 10. EX. HOUSE(2520sf) BASEM'T(2520sf),GAR.(506sf),1962 BUILT 11. CITY CONTACT: ERICK SERRANO TEL:408-777-3250, E-MAIL: ericks@cupertino.org 12. THE DEADLINE FOR THE SUBMISSION OF PUBLIC COMMENTS SHALL BE ((TWO WEEKS AFTER THE DATE OF THE NOTICE AN PELECEDCOPY OF THE PIATJ§ 2Is 1AVAILABLE BY REQUEST. VINICITY MAP 'M _/ I"! Application M@3r ber � Gd s@ rt1 3F L:1T �! 2 -ARBUTUS MARIA 015' O.C. \ (OR APPROVED EQ. -SEE NOTES 1/A-1) 88.92' 26" 0 30" \0 \ N INE PORCH PN 10 11i►e�e�e�eeeee�e�e�e�e�e�eee�eee�eee�l \��eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee� �►eoeeeseeeeeeeeeeel oeieieieieieieeeoeieieieieieieiei� leeeeeeeeeeeeeeeef� \I►eeeeeeeoeeeeeeeee . . ♦eeeeeeeeeeeeeeee�i\ � � lid►oeeee_e_e_�_�_�_o_o_�_�eee,� .eeef : ♦ee��� �seef �. ♦eef�__ \ ��eeeeee� � � ��eeeee®vee+♦� gee . .►eeeee♦ 7'_ 12'_7" l CARPORT 9' I Driveway 0 N I 2 8 .9 2' - - - - 10ft Street Dedication I 0 SITE PLAN S11•=10' -O' 10 0 10 20 30 _ CTR OF STREET -- -NOTES: -- -- -- -- -- -- -- -- 1. Calgreen checklist shall be included as a part of construction documents. 2. Prior to issuance of bldg permit, the Landscape Water -Efficiency Checklist In Appendix A of Chapter 14.15 will need to be filled out. 3. LANDING IN THE SIDE YARD SHALL NOT EXCEED 18" ABOVE FIN. GRADE. MI �. MC S MC O TS AS NOTED ecA1E AS NOTED pipp A-1.0 0�T z � a z d oud F � U U �Cd7v aC: o � F W rsuwly , MC MC O TS AS NOTED ecA1E AS NOTED A-1.0 0�T APPROVAL - Appl t i n Niu bor DRC/&/ Dates fL I I FRONT YARD PAV'G CALS: I Driveway Front Yard Area: S:1'=10'-0" p 88.92 X 20 = 1,778 sf Paving Area: 574+62+48= 684 sf Paving ratio at Front Yard: II II 684/ 1778= 38.47% _ 88.92' 2ND FLOOR AREA CALS i =lo•� FLOOR PLAN AREA CALCULATION: SECTION DIMENSIONS AREA A 31X19 588.1 B 28X11 308,8 C 5.5X13 71.5 D 12X5.5 66 E 7X1.5 10.5 F 13.5X13.5 182 2nd FLOOR AREA 1,227 S.F. G 16.3X23 375 H 17.83X33 589A J 41.5X20.5 850.7 K 43:5X21 913.3 L 21X2 42.1 1st FLOOR AREA 2,770.5 S.F. TOTAL FLOOR AREA 3'997.5 S.F. M 38,83X13,5 524.8 N - 16.3X23 409.5 P 21X19.5 375 BASEMENTAREA 1,309 S.F. muvvN MC a�a® MC care. AS NOTED e :nom A-1�1 a �-r 1 ST FLOOR P LAN —A sl 1/4'=i' -o' APPRONAL Applaanation Nunber DRClA q - iasis kliane�t`l I / / 9 1 12 / — TTP 1_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ I c I o . 7 —6' PL o \ I \ 12 \ TYP. 3.5 \ \ 2ND FL N \ N Si 1/4'=V-0' Note: 1. The property owner shall record a covenant on the property for the new and existing privacy trees and the required front yard tree. 2. Following completion of construction, an affadavit from an ISA -certified arborist shall be provided confirming that the new trees have been planted properly and according to plan, and that the existing trees to remain are in good health. 3. A planning Division inspection is required to verify exterior material/ finishes, trees, landscaping and site work. ELEVATION NOTES, O1 ROOF: LONG. TILE.ROOF ('MONIER UFE TILE' ESR1647-ICC ES CO. OR APPRO. E0.) ON 30 LB BLDG FELT OVER PLYWOOD SHEATING. O-5''. 26 GA. G.I. PROFILE GUTTER ON 2X8 S4S SURFACE FASCIA BOARD WITH DOWNSPOUT AT PROPER LOCATIONS (ALL ROOF DRAINS SHALL BE DRAINED: TO STREET DIRECTLY) O DOUBLE GLAZED WINDOWS (TYP.) ® CUSTOM SOLID CORE DOORS. O 3 -COAT CEMENT PLASTER IN 17 GA. STUCCO NETTING ON 2 LAYERS GRADE.'0' BI.DGPAPER. (WITH 26 GA. G.I. 7 FLASHING AT TOP EDGE OF BLDG PAPER), O RECESSED WINDOW, O SCREEN VENT WITH 1/4' WIRED MESH (TYP.) Q WEEP SCREED (TYP.) O ORNAMENTAL G.T. CHIMNEY CAP WITH APPROVED SPARK ARRESTOR. ® CUSTOM WOOD SHUTTER Note: Any proposed changes to the approved colors and materials on this subject shall be reviewed by the City of Cupertino Planning Division prior to installation/ application. Wi4Yvn1 MC cF� MC Dare AS NOTED eca� AS NOTED Uw INa �T A-3.0 IL 3F er re } N I U U S W t: N b � U a � � G V m oa � I��a N Naafi Si 1/4'=V-0' Note: 1. The property owner shall record a covenant on the property for the new and existing privacy trees and the required front yard tree. 2. Following completion of construction, an affadavit from an ISA -certified arborist shall be provided confirming that the new trees have been planted properly and according to plan, and that the existing trees to remain are in good health. 3. A planning Division inspection is required to verify exterior material/ finishes, trees, landscaping and site work. ELEVATION NOTES, O1 ROOF: LONG. TILE.ROOF ('MONIER UFE TILE' ESR1647-ICC ES CO. OR APPRO. E0.) ON 30 LB BLDG FELT OVER PLYWOOD SHEATING. O-5''. 26 GA. G.I. PROFILE GUTTER ON 2X8 S4S SURFACE FASCIA BOARD WITH DOWNSPOUT AT PROPER LOCATIONS (ALL ROOF DRAINS SHALL BE DRAINED: TO STREET DIRECTLY) O DOUBLE GLAZED WINDOWS (TYP.) ® CUSTOM SOLID CORE DOORS. O 3 -COAT CEMENT PLASTER IN 17 GA. STUCCO NETTING ON 2 LAYERS GRADE.'0' BI.DGPAPER. (WITH 26 GA. G.I. 7 FLASHING AT TOP EDGE OF BLDG PAPER), O RECESSED WINDOW, O SCREEN VENT WITH 1/4' WIRED MESH (TYP.) Q WEEP SCREED (TYP.) O ORNAMENTAL G.T. CHIMNEY CAP WITH APPROVED SPARK ARRESTOR. ® CUSTOM WOOD SHUTTER Note: Any proposed changes to the approved colors and materials on this subject shall be reviewed by the City of Cupertino Planning Division prior to installation/ application. Wi4Yvn1 MC cF� MC Dare AS NOTED eca� AS NOTED Uw INa �T A-3.0 IL 3F er re o I 4 } N I U U Q� C7 c Z W v rn F m F�d N C4I COU [RE000000 22561 QLOALID0 X100 300"TREE C LIFER mol CA. g)5014 VINICITY MAP ¢g is J 2 Z U W 4I W N 10" 1Oft Street Dedication `v-'! In 2—ARBUTUS MARIA 015' O.C. (OR APPROVED EQ.—SEE NOTES 1/A-1) 3.92' / PORCH BLDG—A 2nd FLOOR PORCH rlvewa WE ' r - SITE PLAN SI 1•=10'-D• 10 0 10 20 30 CTR OF STREET _ 1. Calgreen checklist shall be included as a part of construction documents. 2. Prior to issuance of bldg permit, the Landscape Water—Efficiency Checklist 'ger in Appendix A of Chapter 14.15 will need to be filled out. 3. LANDING IN THE SIDE YARD SHALL NOT EXCEED 18" ABOVE FIN. GRADE. n 22'-1" I I I I F, 1 I I I I I O DRAWING INDEX PROJECT DATA: ctra�® MC 1. LOT SIZE: 8,892 S.F. APN 342-29=063 AS NOTED 2. ZONING: Ri-7.5, (2ND FLOOR SET BACK: 15ft MIN.) A-1.0 SITE PLAN 3. CONSTRUCTION TYPE: V—B W/ FULL FIRE SPRINKLER) A-2.0 FLOOR PLANS OCCUPANCY GROUP: R -3f U (2 STORY BLDG) A-1.0 OF A-2.1 2ND FLOOR & ROOF N 4. BLDG CODES: 2016 California Residential Codes A-3.0 ELEVATIONS 5. BLDG AREA: 2ND FL AREA: 1,227.0 SF ((A A-4.0 SECT[ 1ST FL. AREA: 2,298.0 SF. (B� GARAGE AREA 472.5 SF (C) TOTAL BLDG AREA: 3,997.5 SF (FRONT PORCH)104+(REAR PORCH)375 SF+264(CARPORT)=743 SCOPE OF WORKS: 1ST FL 24" EAVE AREA 535 S.F. (F 6, 2ND FL. TO 1ST FL AREA RATIO: A/ B+C)=44.297 7. LOT COVERAGE : (B+C+E+F) 4048.5/ 8,892 = 45.53% 1. DEMOLITION UNDER SEPARATE PERMIT. B. FAR: 3997.5 / 8,892 = 44.96% 2. PROPOSED A NEW TWO STORY SINGLE FAMILY DWELLING 9. FRONT YARD IMPERVIOUS AREA RATIO: W/ ATTACHED GARAGE. 30.87% (SEE SHEET A1.1 FOR DETAILS) 10. EX. HOUSE(2520sf),BASEM'T(2520sf),GAR.(506sf),1962 BUILT 3. OBTAIN J NUMBER FROM THE BAAQMD FOR DEMOLITION 11. CITY CONTACT: ERICK SERRANO OF EX. BLDG TEL -408-777-3250, E—MAIL: ericks®cupertino.org 12. THE DEADLINE FOR THE SUBMISSION OF PUBLIC COMMENTS SHALL BE WEEKS AFTER THE DATE OF THE NOTICE (TWO AN PELEC DCOPY OF THE PLANS` ?S 1AVAILABLE BY REQUEST. VINICITY MAP ¢g is J 2 Z U W 4I W N 10" 1Oft Street Dedication `v-'! In 2—ARBUTUS MARIA 015' O.C. (OR APPROVED EQ.—SEE NOTES 1/A-1) 3.92' / PORCH BLDG—A 2nd FLOOR PORCH rlvewa WE ' r - SITE PLAN SI 1•=10'-D• 10 0 10 20 30 CTR OF STREET _ 1. Calgreen checklist shall be included as a part of construction documents. 2. Prior to issuance of bldg permit, the Landscape Water—Efficiency Checklist 'ger in Appendix A of Chapter 14.15 will need to be filled out. 3. LANDING IN THE SIDE YARD SHALL NOT EXCEED 18" ABOVE FIN. GRADE. n 22'-1" I I I I F, 1 I I I I I O Mc ctra�® MC AS NOTED a�ntE AS NOTED .iw nla A-1.0 OF ear HEE"re I Driveway A 31X19 588.1 FRONT YARD PAV'G CALS: I - Fmnt Yard Area: 308.8 C 5.5X13 71.5 D 12X5.5 66 O 88.92X20=1,778 sf F 13.5X13.5 182 2nd FLOOR AREA N Paving Area: 574+62+48=684 sf I I I I H 17.83X33 589.4 Paving mlio at Front Yard: 684/ 1778= 38.47 850.7 88.92' 913.3 L I 21X2 APPROVAL 1 st FLOOR AREA � ` DR,C ` Application Number 3'997.5 S.F. Date 524.8 Signadiure 409.5 P 21X19.5 375 I G sI— ager 1ST FLOOR AREA CALS 1,10 -.o - ND FLOOR AREA CALS 1�1o. FLOOR PLAN AREA CALCULATION: SECTION DIMENSIONS AREA A 31X19 588.1 B 28X11 308.8 C 5.5X13 71.5 D 12X5.5 66 E 7X1.5 10.5 F 13.5X13.5 182 2nd FLOOR AREA 1,227 S.F. G 16.3X23 375 H 17.83X33 589.4 J 41.5X20.5 850.7 K 43.5X21 913.3 L I 21X2 42.1 1 st FLOOR AREA 2,770.5 S.F. TOTAL FLOOR AREA 3'997.5 S.F. M 38.83X13.5 524.8 N 16.3X23 409.5 P 21X19.5 375 BASEMENTAREA 1,309 S.F. ALCALDE ROAD DEMOLITION 'PLAN g ,D. -D. 1. ALL OIJ-n0 IMPROVEMENT E UNDER S BE REMOVED 2. ALL EXIST. SHALL 8E UNDER SEPARATED PERMIT. 3. ALL EX UTILITIES SHALL HE RELOCATED. CONC C/G 9 IST FLOOR P LAN — B s, 1/4"=1'-0" I I I I I I I o U S CL s^✓as AS NOTED A-2.0 0 z � o Rai � o A COz p�, 'fid o o � V v .� 0 CEJ OHo� ' v MO o-®® MO AS NOTED s^✓as AS NOTED A-2.0 m-�-r Ir ll't -,,'?Dt 1- t 1' APPROVAL 2ND FLOOR PLAN -B S: 1/4"=1'-0" El-- EF PORCH U/To �2 > UA7 oz -4 -Z P 0 P I 4/12 co G 4 0 zM, 4/12 V 4/12 I o Q < iz: > CN Q 4)12 u � 6 �7 3.5/12 UI Z 3/12 C/)P.4 0 F PORCH 3.5/12 Cl) ROOF PLAN -B I 9 / / la / 3.5 FM I j / 2ND L" pwpmamz��Ism 4 P I b I I N °o n n n T ND FL I I 01 c — � 6® i I WEST ELEVATION -B Si 1/4•=1-0• 12 4.9 77M -7 APPT, IL VAL " -A -06,_U � - - - - - - - - - - - l Application Number LJ LJ U / Dago Ng it ire �.%� sty ori;�n� �;r� •rv�l .s LP _ 2ND FL \ \ \ I 1ST FL — — a :r Note: 1. The property owner shall record a covenant on the property for the new and existing privacy trees and the required front yard tree. 2. Following completion of construction, an affadavit from an ISA -certified arborist shall be provided confirming that the new trees have been planted properly and according to plan, and that the existing trees to remain are in good health. 3. A planning Division inspection is required to verify exterior material/ finishes, trees, landscaping and site work. ELEVATION NOTESi. O ROOF: CONC. TILE ROOF ('MONIER UFETILE' ESR1647-ICC ES CO. OR APPRO. EQ.) ON 2-30 LB BLDG FELT OVER PLYWOOD SHEATING. O2 5" 26 GA. G.I. PROFILE GUTTER ON 2X8 S4S SURFACE FASCIA BOARD WITH DOWNSPOUT AT PROPER LOCATIONS (ALL ROOF DRAINS SHALL BE DRAINED TO LANDSCAPE AREA) O DOUBLE GLAZED WINDOWS (TYP.) O CUSTOM SOLID CORE DOORS. O 3- COAT CEMENT PLASTER IN 17 GA. STUCCO NETTING ON 2 LAYERS GRADE V BLDG PAPER. (WITH 26 GA. G.I. 'Z' FLASHING AT TOP EDGE OF BLDG PAPER). O RECESSED WINDOW, O SCREEN VENT WITH 1/4" WIRED MESH (TYP.) O WEEP SCREED (TYP.) O ORNAMENTAL G.I. CHIMNEY CAP WITH APPROVED SPARK ARRESTOR. Op CUSTOM WOOD SHUTTER Note: Any proposed changes to the approved colors and materials on this subject shall be reviewed by the City of Cupertino Planning Division prior to installation/ application. �I • I ' I o� 2ND LN I I I IST F 05/10/'17 PRMUM. DESIGN REVIEW 8/18/'17 DESIGN REVIEW COMMENT; 4 J �tivH MC o�c-cl® MC Dore AS NOTED was AS NOTED .roe rVa ear A-3.0 I N I I 12 120 In o 13 1Y -T —YP-. 3 / N 3.5jT4P: j 2ND F L-- -- --N _- ---------N --- ----------------------- - \ -----_-_- _ - 0000 • 0' iD o 0 20'-1. 1S FL — — — — — - NORTH ELEVATION -B S11/4'=1--0• DRC # -/g-7/ ?)Date o e� �i1� ----- M. BATH M. BED RM Cass Alia-) ic"3ooge' GARAGE HILLWAY GUEST RM SECTION B- B SI 1/4•=1'-0• IN B - B SI 1/4'=1'-0• M ME MY 05/10/'17 PREJM. DESIGN REVIEW 8/18/'17 DESIGN REVIEW COMMENM co S- z z M 4' Z �s 0z n d �w v CA VVN MC o Era® MC onTE AS NOTED a.:ni E .lam Na �r A-4 NOTES: BENCHMARK: '- f a % 077'2 •,25' RW ENGINEERING. INC. �,rpy& '-'"/� - ��-'�°,J CML ENGINEERS LAND SURVEYORS 1. THIS ELECTRONIC FILE IS SOLELY ARCHITECTURAL DRAWINGS TO BTAINRTHE BUILDINGEPER E ARCHITECT FOR THE DEVELOPMENT OF HIS/HER �p391.64 (NAD BB DATUM) APPROVAL _r�C�'� /,�L`t8 � � ��J � (,I _ RW-. 505 ALTAMONT DRIVE 5035 2. THIS MAP SHALL NOT BE USED TO STAKE OUT CONSTRUCRON IMPROVEMENTS IN THE FIELD. . Application Nurfiber MILPRA(4 CA 262-1 3. THE DELIVERY OF THIS MAP IN AN ELECTRONIC FILE DOES NOT CONSTITUTE THE DELIVERY OF MY C.' p _ (P) (408) 262-1899 PROFESSIONAL WORK PRODUCT. THE SIGNED PAPER PRINT IS PROVIDED TO THE CLIENT AS AN BASIS OF BEARINGS: ��U C- �� ' ��� v � — N (FAX). eeft 824-5556 reengineering®gmeil.com INSTRUMENT OF SERVICE - IN EVEN' THE ELECTRONIC FILE IS ALTERED, THE SAID PAPER PRINT MUST BE �'-q REFERRED TO FOR THE ORIGINAL AND CORRECT SURVEY INFORMATION. RW ENGINEERING, INC. SHALL NOT THE BEARING NB9'37'OO'W OF THE CENTERLINE OF ALCALDE ROAD Da7ye BE RESPONSIBLE FOR ANY MODIFICATIONS MADE, BY OTHERS, TO THE ELECTRONIC FILE, OR ANY AS SHOWN ON -TRACT MAP NO. 1757 FILED IN BOOK 71 OF MAPS BOUNDARY & TOPOGRAPHIC M A P PRODUCTS DERIVED FROM THE ELECTRONIC FILE. AT PAGE 46, SANTA CLARA COUNTY RECORDS. - es 4. THIS MAP REPRESENTS TOPOGRAPHY OF THE SURFACE FEATURES ONLY AT THE TIME THE SURVEY WORK}iE�y� JUNE 27, 2017 WAS COMPLETED. y qV . CONSISTING OF ONE SHEET lase- ielanaaac er 5. BOUNDARY LINES DELINEATED ON THIS MAP ARE ESTABLISHED BASED ON A FIELD SURVEY FROM FOUND MONUMENTS AS SHOWN ON TRACT MAP N0: 1757, FILED FOR RECORD IN BOOK 71 OF MAPS AT PAGE SITE, 2256PALO,A CA 46, SANTA CLARA COUNTY RECORDS. 0 5 10 20 CUP 6. UNLESS SPECIFIED ON THIS MAP, LOCATIONS OF THE UNDERGROUND AND OVERHEAD UTILITIES ARE APN: 342--29-029-063 C NETHER INTENDED NOR IMPLIED. FOR THE LOCATIONS OF UNDERGROUND UTILITIES CALL *USA' AREA: 19,562. S:F.f (1-800-642-2440). — SCALE: 1° = 10' i 7. ALL DISTANCES AND DIMENSIONS ARE IN FEET AND DECIMALS. / .� / \ \ v ualYD'.g B. BUILDING FOOTPRINTS ARE SHOWN AT GROUND LEVEL 9. FINISH FLOOR ELEVATION TAKEN AT DOOR THRESHOLD (EXTERIOR). 1 _ x v" •a . I aE ` — ^v b 30° v". .a b °' 171.84' ,w a 1 BB A ND. 1•t 10. A TITLE REPORT FOR THE SUBJECT PROPERTY HAS NOT BEEN EXAMINED BY RW ENGINEERING, INC.. 26° a1. plen '4°-1B OTHER EASEMENTS OF RECORD MAY EXIST THAT ARE NOT SHOWN ON THIS MAP. 1 1� a1' >" �4r� oa cati�° X SHE �1. ,. ryb'V" •�h. hq •� 9 LEGEND Ail CONC PAno e Js _- PRDPOW LINE ti ` ry1'` /,•1� avbl' ab>`° ab;� ,rbh,eq �'9 ?y CENTERUNE'`I' 19 a1� �h h y�� ryh. 1 SS UITLIIY LINE -TYPE AS NOTED '� .>19` a 9b • ' ? Al X yJy ADIACEM y 01 MR? . '� e°'v, vb� v / V vel • ,a11' a° ^P STREET LIGHT HOUSE �PG&E UTILITY BOX -TYPE AS NOTED a°" bqo 11 v1b ^b� qb,.a'` qy • 3 �, v I Mae] SWM/GM WATFR/GAS MEIFRq .v1M1b y 9 b? b'b�❑ a k 3 fib' pb� ,sb' �/ \ vb� POND o 11 •` Ax l D4 WN WATER VALVE (� M 46) ry� a 0.9 �° - vy� ,b CURBBASIN '9 •vbR +b�q,. ;N9 ro • '�\ CONIC PAno vya �. d°v'4va.� w q1 ' ti � • * :�` pqe ��� 'dry w l' b5 'l°'p1 •y � ,a'lb 'L O MH M4Nt1(N.E T'PE AS NOTED 1 1b FIRE RMRANT •P eb. pbq by vb' OCC) SANITARY SEWER CLEANOUT , b? b�vb •`0 vb ° CONIC PATIO bb 0 v1.+ bb" a ;@. y e1b' ry v �vb'� q'�.v' PARCEL 1 PPO—OH POWER POLE OVERHEAD WIRE CONC D/W `� ,: y ° °� CHIMNEY ab"" `b� �v - (670 M 23) BENCHMARK + ^� / v4b. CONC PATIO I HOUSES —200— CONIXIR UNE` I o@MON MONUMENT by TREE -TRUNK DIAMETER IN INCHES �, X 12° SPECIES NOTED WHEN KNOWN 5 —5 1 b6 " ..GUY WE $ CO ABBREVIATION ADJACENHOUSE HOUSE m ;C' CONIC :�ti FF=430.7 AD AREA DRAIN.fib ay. •vh A.E. ANCHOR EASEMENT GARAGE ro / BAC RI BRICK ASPHALT CONCRETE I ,O�' FF=429.25 o qv / \ G �avb pbmb X11 �yq I-Pp.I C/G CURB & GUTTER C CONCRETE �o"�� v. b A ,a • ". DI DRAIN INLET b 4300H q1 „a� •" FF FINISH FLOOR GRADE qe ' M1 b a FL FLOWLINE ,�' ;9� �� ;8' "� C4 v� / �LL d GM GAS METER 'b.01b 4,p6 1" IRR LG LIP OF GUTTER > ' ;@ •a �, 1h 5 -_bry / \ MB MAIL BOX CONIC ,0� v. P.I.I.E. . PUBLIC UTILITY EASEMENT M` P.S.E. PUBLIC SERVICE EASEMENT - " �b •`@ p@h'" / • 1 SDMH STORM DRAIN MANHOLE •M ,.q� 11b v `try b ab?" b �. \ SSCO SANITARY SEWER CLEANOUT 16° .' e ti SSMH SANITARY SEWER MANHOLE ;D� I ,P� a • bg? �- CO d` O ' I" 10 S/W SIDEWALK ' by kb?" \ .0 0 o I TC TOP OF CURB 11" y>� ' h SIDEWALK TRC TOP OF ROLLED CURB 1b AC D/W v v 'P b° W.C.E. WIRE CLEARANCE EASEMENT �' ;'�' M1b' :'' ( 10• 1 ,>1' 61M1 AC D/W 11 ti �'' O 12° h WM WATER METER pq. .b? MB.. 1b asa oo WMbe _ ��v"= /?�? " p, titi.. �-- OH ° v - QIi bFl - — OH ,9 . �H C� 1 OI "'PA' 01 . '� AC D/W >b°-�` ..°'yb vee °& ` 1 \ "1 \ _ TEL v >'' CONC C/G a1. �- EDGE OF PAVEMENT" 6yP° 6yyh vg �"` ,1 SO SD SO SD �— S SD SD D SD SD SD SD SD SD SD SD D SD Oa� D SD a 9 �e h��— _ �b� ry11q 1�` •� _ _ e � 1V853708'W — + � • - 374.45' ` SS SS SS SS SS SS SS SS SS SS SS SS SS . SS. SS SS SS SS. SS SS ALCALDE ROAD .. CONC C/G a? EB WA'D'ER USAGE LEGEND All 1511 d HARDSCAPE L EGEND ZONE DESCRIPTION IRRIGATION AREA SYMBOL DESCRIPTION ZONE A: GRASS AREA HIGH GR TBD EM]CONCRETE PATH WAY WITH BROOM FINISH ZONE B: N/A TBD H ZONE C. PLANTING AREA LOW TBD TILE OVERLAY OVER CONCRETE W COLORED STAMPED CONCRETE E-+ TOTAL LANDSCAPE AREA TBD (INDICATED IN THE PLAN) \9 i PORCH ® INTER LOCKING PAVER GRASS AREA: TBD Q LLQ _J FI BLDG AREA NOTES: a. The property owner shall record a covenant on the property for the new trees/shrubs planted for purpose of required replacement trees, privacy protection, and required front yard tree. b.Following completion of construction, and affidavit from an affidavit from an 1SA—certified arborist shall be provided confirming that the new trees have been planted properly and according to plan. c. A planning department inspection is required to verify exterior materials/finishes, trees, landscaping, site work. d. A certified landscaping professional shall conduct a landscaping installation audit after the landscaping and irrigation systems have been installed per Chapter 14.15 (Landscape Ordinance). The findings of the assessment shall be consolidated into a landscape installation report provided to the PlanningDivision. 0 r0 NNGN� -- -- RSP\ -- - OVERLAY AP ROV A\L 9 -,20/C? -,92> Dq DRC ���,� rr f' 0 Application 6�9umbar Date Sgnalhurgj e. The property owner hall sign a landscape maintenance agreement per Chapter 14.15 (Lan cape U?�Mce), prepared by the Cit and record it with the Santa Clara Co. ecorder;RPRNice. The property owner all contft� E the Planning Division in advance of the fi of to prepare the ogre ent. f. A certified lands a e' professional shall provide a landscape and 'rrigation maintenance schedule per Chapter 14.1 (Landscape Ordin vice) to the Planning Division. GENERAL NOT ES: E C 1. ALL HARDSCAPE AND LANDSCAPE AREAS SHALL NTING AREA HAVE PROPER SLOPE AND DRAINAGE AWAY FROM THE HOUSE OR TOWARD APPROPRIATE DRAINAGE STRUCTURE TO CARRY WATER TO AN APPROVED DRAINAGE OUTLET 2.CONTRACTOR IS RESPONSIBLE FOR PROPER DRAINAGE OF ALL AREAS AND SHALL ADHERE 0 TO ALL APPLICABLE LOCAL BUILDING CODES s— AND INDUSTRY STANDARD FOR ALL WORK CONTAINED IN THESE PLANS. S 3. CONTRACTOR IS RESPONSIBLE FOR FOLLOWING APPROVED, BEST INDUSTRY ACCEPTED PRACTICES, SPECIFICATIONS AND METHOLDS FOR INSTALLATION OF ALL ITEMS CONTAINED IN THESE PLANS. 4. CONTRACTOR SHALL PROVIDE A WRITTEN WARRANTY FOR ALL WORK CONTAINED IN THESE PLANS. EnV2, Inc. EnivislunefNa e L1937CONCOURSEDR, : A, B, C27 9109.51 SE,CA 95131408) 890.628908) 886-7229 z d a /( '- ' I • \•` -� O Q R; U w a r N �J a E- U H P N w N W E-+ LLQ \9 i PORCH z z Q LLQ _J �•iooii000000000soo Li ,I :, i°opioo°i� ' 'ii°iooi°iosoi°i°ioioi°i°i \:000000°000°o°o°o°�°0000000°� Lw 4 / 0 ,00000♦ •��00000e0000000000♦ \ 1 � � (foo°000°o°o°000°o°o°o°o°o°00000 1 ♦000000000000000♦ 1 r0000000000000000� �►00000e0000000000e� LLJ I�:♦♦10♦°00000♦:::� ,00000000000000000� IN o::::o:♦°0000\ • • / ♦o♦♦:o::::::::::/ / � y •/'I�°°o°°°o°o°o°°°o°o°o°o°o°o°°°oo�l �/�000 o 1000°-Gi�XVE AREA — �.iv��'o°oo�������°����°°o°�\ 14 .LUU—A ��°° ►��,�� \;!0001°o°o°h•_._. I���°°o . • • �o°o°°°�°���� \ ; / )°o♦ ➢ ��%moo°oo°off M1111-1 �l000---.-.--.-.000000�l ■ ►�°°°°°o°o°°°°000°°°o°°°►00000♦ �000000000000000000. °o°o°o°o���°o°o°°°o°o°°°o°o°o°o°�� ♦000000000�� "� . C000000000000s00000r ♦00000 I�0000•.o�►00000e0000♦ ♦00000:♦♦::� � , �`'��• ►°°°o°o°°°°0000°°o°°°00000°°000°°°°i�il ►°0000°i°ooi°ioioi00000i°i°ioi=opo!!! _u�.; � iso°o°o°oho°o°o°o°o°o°o°o°o°o°o°o°o°off i . '!, . ��o�o�owo�i�°o°o°°°oo, 'o�o�o�e�o�o�o�o�oeo�o�e! MA, � s ' /s°ooi°ooi°o°o°i!•!00000!o!•!• r r000000000°o°o°0000000000000/ 000..00•. I+®_._.r._ .r�••o„ I� �\ •��°000000000°o� - \i0000000• ®�� �°°°o°o°♦o♦o•°t� ��000000�ii 1 \� �� 1 _®_i � '• /iliooioi°i°i°ioel / / ►000°o°o°000°o�� , � 1.0♦ ♦0000 . = = _--= ._ �_�I__ --_ � -- I �; I IVV'v Vvv I :V7: Of yb�o�o�,goo,°bviop000�obio,.,t•�!�!�°!�!�!+!��!\_ iiiei°iei°ieiei°ieo°ieieiei°i°iei°i�,ve. e°°°°°e°e°°°°°e°°°e°°°e°e°°°e°°°��e'���'■����I� I' E _ w•.nra.�e li■ 3 .J���➢■sl (�i� �IL I •�-� � � ' �i� / �`���►°�i°�°oeS°�°i°S°ieS°� _ `+°�°000�o��el°I°I°I°I°I°I°I°. � _.'►..�.. � ei 0 0 0 0 0 0 0 0 �_ � � `.��i�i�i�ii�i�i�i�i�i �►i�i�i�ieo�ioi�i�s�i�r 0 eieiei°i°i°ieieieo°iei°i°ieiei°i�ae.■•���■.���■ � ■.���■3���►►.seieieiei°o°iei°i°i � / e1eo°o°o°leo°1°oeo°oeo°1°oeoeo°1�... eoeoeoe°e°eoeoeoeoeoeoe000eoeoe.� eoeoeoeoe°eoeoeoeoeoeoeoeoeoeoeo� e1°o°o°0°1°0°0°1°0°0°1°1°0°1°1°1� o .. , / ieieieieieieieieieo ieieieieieoeieieiei Re°O°e°e°e°e°e°°°eo �o�o�oeo�o�o�o�o�o�o�o�o�o�ov000� e0e0e0eoeoeo 0 0 0 0 0 oeoeoeoe0i � �� > �eoeoeoeoeoeoeoeoeo i o° o s o 0 0 0 '_. ®��,•� eo°o°o°o°o°o����^��eoeo� � � ,���'� % . t, _I® i�oe � ��`�o�o t i�j�j�j�j�j�j�j0jej�j�j�j�jej�j� eoeoeoeoeoeoeoeoe000eoeoeoyeo� � ii �1��1 i e / �� �0���������� ������ gieieoeo�ieoeoeoe! oeoeoeoeoeveoeoeoeo .• i a� ,, , c•',•.'� •• .eoeoe°eoeoeoeoeoeoe°eoeoeoeo� x'10°1°1°1°1°1°1°1°O°1°1°1°1� , • °1010101°1010101010 ,�' � ,1 1 0 r0 NNGN� -- -- RSP\ -- - OVERLAY AP ROV A\L 9 -,20/C? -,92> Dq DRC ���,� rr f' 0 Application 6�9umbar Date Sgnalhurgj e. The property owner hall sign a landscape maintenance agreement per Chapter 14.15 (Lan cape U?�Mce), prepared by the Cit and record it with the Santa Clara Co. ecorder;RPRNice. The property owner all contft� E the Planning Division in advance of the fi of to prepare the ogre ent. f. A certified lands a e' professional shall provide a landscape and 'rrigation maintenance schedule per Chapter 14.1 (Landscape Ordin vice) to the Planning Division. GENERAL NOT ES: E C 1. ALL HARDSCAPE AND LANDSCAPE AREAS SHALL NTING AREA HAVE PROPER SLOPE AND DRAINAGE AWAY FROM THE HOUSE OR TOWARD APPROPRIATE DRAINAGE STRUCTURE TO CARRY WATER TO AN APPROVED DRAINAGE OUTLET 2.CONTRACTOR IS RESPONSIBLE FOR PROPER DRAINAGE OF ALL AREAS AND SHALL ADHERE 0 TO ALL APPLICABLE LOCAL BUILDING CODES s— AND INDUSTRY STANDARD FOR ALL WORK CONTAINED IN THESE PLANS. S 3. CONTRACTOR IS RESPONSIBLE FOR FOLLOWING APPROVED, BEST INDUSTRY ACCEPTED PRACTICES, SPECIFICATIONS AND METHOLDS FOR INSTALLATION OF ALL ITEMS CONTAINED IN THESE PLANS. 4. CONTRACTOR SHALL PROVIDE A WRITTEN WARRANTY FOR ALL WORK CONTAINED IN THESE PLANS. EnV2, Inc. EnivislunefNa e L1937CONCOURSEDR, : A, B, C27 9109.51 SE,CA 95131408) 890.628908) 886-7229 z d a a U O Q R; U w a r N �J a E- U H P N w N W E-+ LLQ U z z Q LLQ _J Li LL— Lw 0 Q _j LLJ Q Q i C Sheet: L 1 0 1 of 1 Sheets. LEGEND OWNER & SUBDIVIDER: PROPERTY LINE CENTERLINE _SS_ UTILITY UNE -TYPE AS NOTED �o STREET LIGHT [I ELEC UTILITY BOX -TYPE AS NOTED SWM WATER METER i WATER VALVE STORM (ON-SITE): CURB CATCH BASIN STORM (OFF SITE): FIRE HYDRANT 0 MH MANHOLE -TYPE AS NOTED 0 Co SANITARY SEWER CLEANOUT PP`( --OH— POWER POLE W/ OVERHEAD WIRE CABLE IV. BENCHMARK 200— CONTOUR UNE @ MON MONUMENT If12-t TREE -TRUNK DIAMETER IN INCHES 12" SPECIES NOTED WHEN KNOWN OVERLAND RELEASE ABBREVIATION P.S.E. PUBLIC SERVICE EASEMENT BENCHMARK: SCVWD BENCHMARK BM#401 Ei 391.64 (NAVD BB DATUM) BASIS OF BEARINGS: THE BEARING NB9'37'00"W OF THE CENTERLINE OF ALCALDE ROAD AS SHOWN ON TRACT MAP NO. 1757 FILED IN BOOK 71 OF MAPS AT PAGE 46, SANTA CLARA COUNTY RECORDS. EX. FUTURE R/W R/W 20' 10' R/W DEDICAi 4! 5.5' 0 0 AC CONFORM To CENTERUNE PAVEMENT OF OF MEET PAVEMENT 0 = MIN. NEW C/G ile PER Fr. S W NEW S/W i ROADWAYO WIDENING TYPICAL HALF ALCALDE ROAD STREET SECTION NOT TO SCALE BB.i ................ . ........ . A AI HwW3_1 fiI YFX'_� 057 A. m g 0 ... . ... . II 00 C! 7 fi 0 OF 10' GAS NE EASEMENT 1750 O.R. 213 rport SHED TY BUILDING BE REMOVED 'nk GENERAL NOTES: OWNER & SUBDIVIDER: ALLEN & CINDY HSU 10229 SCENIC BOULEVARD CUPERTINO, CA 95014 APN: 324-29-063 EXISTING ZONING: SINGLE FAMILY RESIDENTIAL PROPOSED USE SINGLE FAMILY RESIDENTIAL WATER: SAN JOSE WATER COMPANY STORM (ON-SITE): N/A STORM (OFF SITE): CITY OF CUPERTINO SANITARY., CUPERTINO SANITARY DISTRICT GAS & ELECTRIC: PG&E TELEPHONE AT&T CABLE IV. COMCAST SOLID WASTE & RECYCLING WEST VALLEY COLLECTION & RECYCLING TOTAL ACREAGE OF 0.45 AC (19,562 SO. FT.) PROPOSED SUBDIVISION: NB9*37'00"W 177.84' ................... . ..... ........... ......... . .. .... ...... ...... . .... . . . . . ................... . . . . . . . . ......... NEW RETAINING WALL _­ . ............. ­.._.._____ BUILDING SETBACK .. . : I ........ . . . . ................... .. . ............. ...... ....................... . ........... 7. 33 PO I .._m 22'-l" ii 0 .. . . .. .. ...... - _77 ......................... .......... 17i-747'77' jq.7"77-777-7-Y 7- L PARCEL B 8,892 S.F. EX. HARDsrAPE & RETAINING WALLS TO BE .................. REMOVED EX. HOUSE & GARAGE TO BE REMOVED PARCEL A 8,892 S.F. P o r c . ................ SHEET INDEX .......... ........... X. D r yl 'd' DESCRIPTION SHEET NO. COVER SHEET TM -1 ................. . ......... . . 11;..........................::::.-:..,-�'.'...'.'.'.'.'.'�::::��:.,.,..jl-l- ....... PRELIMINARY GRADING PLAN TM -2 Q NEW POWER POLE FUTURE R D EAN"G LOCATION. COORD]i E WALLS TO BE 0 5 10 2D H WITH PG&E R.O.W. REMOVED B.92' '37'00'* ..... ... . . ............ SCALE: 1" 10' El cd3 .a s ............. .................. ......... .. ....... 77=_ . ........................ ;'jil . -rfT ......................... . ---'--4 " v .............................. . =77777777 TMG� P-A� 00 20' GAS LINE EASEMENT RELOCATE TEL sp ....................... .......... ..... ....................... �"n - ............................... .. .... . ... ..... .. .. ... .. ........ . ... ...... ..... ... 5D .............. .. . ...... ! . . ............................ & NEW CURB & MER ROADWAY WIDENING VOULT TO. i (NI '20�. ROADWAY. DEDICATION 10' STREET AND SIDEWALK Ac CONFO COORDINATE.V "F STREET PO COORDINATE 2057 O.R. 244 DEDICATIONCENTERUNE OF REPOWER ITH PG&E 62.00' MON-11E LINE 177.81V W N81 (BASIS OF BEARINGS) 436.45' MON-MON SIS ss. —Able— .. .... .. .. ... ....... . ... . . ....... .. ... ..... .. . .. .. . ...... . ..... .... ......... ISS .............. APPRMI%L CALDE ROAD bi Amok- Jon, uron . ............ ....... ......... ................... . ............. .............................. .. . . ..... ..... . .... ........ ...... .. ...... ... .................................. . . . .. . ........... -XI Date "ass VOSS AV o PALM AV _FPi ALCALDE RD ---- I SITE SANTA PAULA AV Amfl RD o VICINITY MAP NOT TO SCALE PARCEL A I PARCEL B TOTAL NET AREA 8,892 S.F. :8,892 SZ IMPERVIOUS SURFACE 4.480 S.F. I PERVIOUS. PAVING 421 S.F. 1 421 S.F. PERVIOUS SURFACE 3,991 S.F. 1 4.561 S.F. P'1-771' 77�1 7': HOVU9 v 0"M CA, ..... .. . ...... .. . ...... .. ver .. ...... . .... ... .... 196.61' MON-TIE UNi .. ..... .. .. .. .. LD zi 0 . z z z LU LU Z z Li 50541 RENEWAL DAM Ol 0." CALFF DATE 11/20/17 I­_ Lu LLI r U) 01-1 uj 0 0 SCALE: AS NOTED DESIGNED BY: RW DRAWN BY: RW SHEET NO. TM=1 I OF 2 Si j+L DOWNSPOUT 18' EARTHWORK TABLE - NONT FSDSTACLE 10' MIN?* CONTRACTOR SHALL REFER TO STRUCTURAL CUT FILL IMPORT IMPERVIOUS PLAN FOR CONSISTENCY COBBLES GROUND LOCATION (CY) (CY) (CY) PRIOR TO CONSTRUCTION. OCCURS. 2» PARCEL A 50 3D I FINISH FLOOR MIN. - N - PARCEL B 250 50 SPLASH FLOOR JOISTS BASEMENT 0 350 BLOCK 24' SANDY LOAM z 2.1 B. W/ MINIMUM TOTAL 300 430 130 nm MIN. N MAX I S=5% MIN.* 20" MIN. OF 5'/ R. NOTE (VERIFY) ROCKED SWALE ONLY. CONTRACTHWORK ORS IAIES ON THIS TABLE ARE OINFORMATION S ARE TO PERFORMTHEIRz TAKE -OFF. EARTH SWALE 0 TM NOT TO SCALE 19> MIN. m �. TW 428.0 TW 428.1) TW 427.9 � _ � BW 426.8 BW 426.5 DAYLIGHT 1 TYPICAL GRADING AROUND FOUNDATION 6' m= w TM NOT To SCALE ' -_. ....... .' -, -, ., �," " 1 . L1). „r h eFL FL -777-- s k; ,". . , / r u426.4 -" e% / 424.6 RIM: 427.5 w: RIM 427.5 ROCKED SWALE PE((����` INV k426.0 FG >"vBW 425.9 FG , % m '6 DETAIL 2/TM1 0 1% FL A ,�. 4277 E 427:2 :;" A .'�° MIN. (TYP.) 424.5 ^ ryb wr. 4^x33 LF -6' PVC 33 LF,-6"PVC..., l�aY6J • RIM 427 5� hr FL tl�; .� ........ SO 0 S=0.OD5 ` - SO ®S=0.005 BWy425.8 9 427.0 „ .V, FG O 'tie428k DS •veil 426.0 427.2.-,I+ a .° \ ;5"•,, 0 FL A `_ '<;° •� ".Y '�>' . �:i P Z+.H s e'`� n 427.7 t ROkH PERK e ys o: ^' ao°' TW 428.0 .' M • i / , b� BW 42 .0 4a." ,i` DS,, - MIN ^9' B tis FS 4zo ayr FS .e .\ �' ..f •• e� 427ID A 429.0 ,. • ^ 39 LF -6 PVC , ' '� •`• e ,g: p e - -"' a *°' SD 0 S=0 D05 2% PER pEfAll. ..SWALE PER DETAIL e O, e•9>k 1 ®MIN. ,v' ';, 1/TMt 0 1% MIN. o� (TYP.)R#�. MAINTAIN EXISTING,''' (TYPry) 6' REDWOOD GRADES ALONG ' taeg, e t'..Et} FENCE PROPERTY LINE r •e :,a '�` 6' Afl qY. 6'' 1 o} 4 FS " f ";� xr ^y „1`' PARCEL A RIM 427.4 RIM 426.7 u 427.0. s -\ 428.6 kA. p Ds FF=430.7 INV 425.4 INV 425.2 �a _ DS PARCEL B GFF=427.0' FS . FS GFF=4'i9.i` FAD=428.7 DS 1e` azs.D 429.3 p FF=428.7 EARTH >� ..QARPORT TM PAD=426.7 „ SWALE 3` 8 'l S' PAVERS) GARAGE 6" PVC 0 0.5% I 0 IN G RAGE 2 TyAf4AEARTH 2% �� MIN. (TYP.) e e 38 LF -6' PVC 101-V ',^ p SO 0 S=0.005 e - 29.0 p FS 38 LF -6' PJC GM N GM 9 k . i n GFF=429.5' SO 0 S=D.005 Y Y `:. '' GFF=,'426.8' a FL I I 423.8 EIA 4` SECTION C C ? 428.0 427.2 e a kaT' a net .�, FL i .., : P0" Porch ��, NOT TO SCALE 426.9 0 k �. a DS a� DS _ DS•"�„ NEW D/W �•, ^ "e - Q DG y(ALK a (PAVERS) 0 NEW D/W (PAVERS)2gl cah / �e' BSWenBSW J BSW RIM 427.2 429.50 a 426:81" a 428.25 INV 425.0 ' PROVIDE AC CONFORM 0 NEW SIDEWALKTC a• WM 429.31 _ y5; d. s I I Edo FINISH GRADE SLOPED PER PLAN 0� 0 °rN z M U e - W DRAIN ROCK Z 4x6 POSTS 0 g 4' O.C. w 2X REDWOOD PLANK. 18" MAX.. HIGH FINISH GRADE .SLOPED PERPLAN NOT TO'SCALE SWALE TAIL 0 1% fp.) R EX. FENCE I KEYSTONE WALL OR SIMILAR. 18' MAX. HIGH FINISH GRADE SLOPED PER PLAN - NEIGHBORING LOT SECTION B -B NOT TOSCALE 42 FG RIM 426.7 •- . g 428 0 .`'" INV 425.0., , e } ti. �.. and OVERLAND RELEASE ' OVERLAND '�'^ BSW cs / .,5` BSW 425.19 `A26i BSW 424.63 .' ,,RELEASE 423.94 z,Fy BS eL WM .,_ •,. -,.- l �:::i(: far P3,Y??'r"#t: � r ..,:, ,.._. rE-, 3 :1;1 Yl " Lt - Sa "' St .. ................. SO ......... :... y0 G.i \�-•- Fi; - NEW CURBr,&. GU11ER ........._..., ..... ......... : ........................ r: ;. .... ..: .,. 0 G.......".^w.--� as �` AND SIDEWALK `-' .� _ 6' ROADWAY WIDENING.�� , NEW POWER POLE LOCATIOA[, AC CONFORM TO N COORDINATE WITH PG&E CENTERLINE OF REIOC JOINT TRENCH TO 1 STREET POM - FOR 4; •" ^ ;r a�'r`3 J.. " ITH S=0.0332. HOUSE ..� ys. s4;;=-- `:?• ............. r, 4.. c . .. c: :............................ Sw................................. SS .......................... _...__.. _....... ........................... aS N WATER SERVICE NEW SEWER LATERAL EX. SEWER LATERAL ,�„,�. n METER TO HOUSE HOUSEAND CLEANOUT TAND O ol"Ir"fll_/fj��.'"-�. HOUSE REMAINLEANOUTTO 1 U ca (((FVVV�E�B �9®095F&9�P I' (D sdeiv9 lavage, u 4) / :- W W w- w-�--�------ W ,a- w- ;-- 'w- �w,__,�...�... W-- ROAD A,CA,DE ROAD `\ 423.75 ix "ry �- RELOCATE %LEPHONE VOULTTOI•14 SIDEWALK. COORDINATE�WITH AT&T 50.0324 ................ wS SS �-- NEW WATER SERVICE & METER TO HOUSE U� Z C7 N LU �Z Z.6 w r23 ���� CL' v s 5 =00. QROFESSip 50541. � -RENEWAL DAM 06-30-19 �q�, pi V1�•�`! 1)F Cry\F DATE: 11/2D/17 z Q Q a. z_ 2 z LU 0 C)< a. CD ........................... SCALE: AS NOTED DESIGNED BY: RW 0 5 10 Y0 DRAWN BY: -RW k1wI SHEET NO. SCALE: 1" = 10' T 2 OF 2 SHEETS