HomeMy WebLinkAboutAH Summary 04-12-2018OFFICE OF. COMMUNITY DEVELOPMENT
CITY HALL
10300 TORRE AVENUE o CUPERTINO, CA 95014-3255
(408) 777-3308 o FAX (408) 777-3333 > planning(& cupertino.org
To: Mayor and City Council Members
Planning Commissioners
From: Benjamin Fu, Assist. Director of Community Development
Date: April 17, 2018
Subj: REPORT OF ADMINISTRATIVE HEARING DECISION MADE
April 12, 2018
Chapter 19.12.170 of the Cupertino Municipal code provides for
Appeal of decisions made at an Administrative Hearing
1L. Application
TM -2017-02; R-2018-08, R-2018-09, TR -2018-05 (EA -2017-02), Cindy Hsu (Greenleaf Group, LLC),
22561 Alcalde Road
Description
Tentative Map application to allow the subdivision of a 19,562 square foot lot into 2 residential
lots of approximately 8,892 square feet each; and to allow the construction of 2, new two-story
single family residences on the newly created lots; and a Tree Removal Permit to allow the
removal and replacement of trees to facilitate the residential construction; A Mitigated Negative
Declaration
Action
The application was approved at the Administrative Hearing. The approval is effective April 12,
2018. The fourteen -calendar day appeal will expire on April 26, 2018.
Enclosures:
Administrative Hearing Report of April 12, 2018
Resolution No(s) 88, 89, 90 and 91
Plan set
Subject
OFFICE OF COMMUNITY DEVELOPMENT
CITY HALL
10300 TORRE AVENUE e CUPERTINO, CA 95014-3255
(408) 777-3308 e FAX (408) 777-3338 e r1anningy@cupertino.org
ADMINISTRATIVE HEARING STAFF REPORT
Agenda Date: April 12, 2018
Mitigated Negative Declaration, Tentative Map, Two -Story Permit, and Tree Removal
Permit applications to allow the subdivision and development of an approximately 0.44
acre lot into two (2) parcels of approximately 8,892 square feet each; (Application No(s).:
TM -2017-02 (EA -2017-02), R-2018-08, R-2018-09, TR -2018-05; Applicant(s): Cindy Hsu;
Location: 22561 Alcalde Road; APN(s): 342-29-063)
Recommended Action
That the Hearing Officer adopt draft resolutions to:
a. Adopt a Mitigated Negative Declaration and Mitigation Monitoring and Reporting
Program (Attachment 1); and
b. Approve the Tentative Map application (Attachment 2);
c. Approve the Two -Story Permit applications (Attachment 3); and
d. Approve the Tree removal Permit application (Attachment 4.)
Discussion
Project Data:
r
en'ea]1 llara7�llnng
Inspiration Heights Neighborhood
LIE_
Low Density (1-5 DU/Ac.)
R1-7.5
,firs:,z3.'dki#%" 5:3Y''E �3Lv�,ftr �e,3a
4 m� 4 f ✓# k i ,E �;c3 #S; iZ�i
iy�sa siRgart,
9
i#, ?kA"�.§tiY . bf,�F... £, H ''.rc Y a" F .! k P °"' #?b_sY'iw`�y ?%K�,,`� r`3,z', J. i
>;r s3 ,. & 2 S" :: £s'¢ L w N kaX'�i� "S
fid '8ryra° , c¢�y€; �
I�'�l.
lRfuv'„P&9•C :{._. v. �
s.i
2.27 DU/acre
�4' �3. a; ..-
� E ��
$'�' ,z' S
,.rY ., ✓. ,. _ ct... Fd- .,,,,,'mlM"i
5 DU/acre
001
De�sntIn §y10,10 #
ME
19,562 square feet (0,44 acres)
L®tp�ze �nq
17,784 square feet (0.40 acres)
� }
iT�t.ILt Areae,
E'
✓ E b
ri '�sie
w
c�Z _#' ' 3�b4 `� � -q-
3 S � �' ,$ f '�r �,3
r�e��J�3,eyelop�m��n3t 4.�n ���,�1ll��re�wr#.
� �
7,500 (min.) 8,892 sf 8,892 sf
...........
ryof{Saes��
�
u S%
4,001 sf
3,998 sf
3,998 sf
Rx3(mc 45%0)'65
w FA
I of overage (anax 50 Ip)
4,446 sf
4,049 sf
4,049 sf
�
TM -2017-02, EA -2017-02, 22561 Alcalde Road
R-2018-08, R-2018-09, TR -2018-05
Paae 2 of 7
April 12, 2018
20' 21'6" 20'
20' 22'6" 22,6„
15' combined (no
side yard setback 76" 1911" and 76"
shall be less than 5')
25' 25' 25'
25' 31'6" 31'-6"
25' combined (no
side yard setback 26'10"and 277" 277 and 24'10"
shall be less than 10')
66% 44.29% 44.29%
28' 26, 26'
family residences, wim aupiexes
adjacent to the site to the north and
across Alcalde Road to the south. A 4 -
unit single family residential planned
development is also located at the
southwest corner of the intersection of
Alcalde Road and S. Foothill Boulevard.
The project site currently contains a single family home (approximately 2,500 square feet),
and a detached garage (approximately 600 square feet). Vegetation present on the site
consists of gardens typical of single family residences in the area, as well as a small
number of trees including, but not limited to, coast live oak and pine.
TM -2017-02, EA -2017-02, 22561 Alcalde Road April 12, 2018
R-2018-08, R-2018-09, TR -2018-05
Page 3 of 7
Analysis:
Conformance with General Plan and Zoning
The proposed project is consistent with the General Plan land use (low density
residential) and density (1-5 dwelling units/acre) which allows a maximum of two (2)
dwelling units on the site based on its acreage.
Development Allocation
Since there is only one residence on the property, the proposed subdivision will need an
allocation of one (1) unit from the Citywide residential development allocation. This will
leave a balance of 98 units in this allocation pool.
Subdivision Design, & Street Improvements
The project proposal will create two lots with frontage on Alcalde Road. The proposed
lot width, of approximately 89 feet each, is more than the lot development standards of
the Single Family (R1) ordinance minimum of 60 feet. The proposed lots are rectangular
and, at 8,892 sf each, are equal in size.
The project is required to dedicate 10' of its existing frontage as right-of-way in order to
accommodate required off-site improvements consisting of a detached sidewalk, curb
and gutter, street trees, and pavement work. The resulting dedication reduces the existing
lot size from 19,562 square feet to 17,784 square feet. The off-street modifications to the
parcel frontage will be similar to the existing off-site improvements in front of 22539 and
22519 Alcalde Road to the east of the project site.
Tree Removal Permit
There is only one protected tree on the property, a 37" Coast Live Oak (Quercus agrifolia)
tree on the proposed Parcel B, which the applicant is proposing to remove, to allow
development of the site. The tree, because of its species and size, is considered protected
and necessitates a tree removal permit. Consistent with Cupertino Municipal Code
Chapter 14.18: Protected Trees, the applicant proposes the replacement of the removed tree
with a 36 -inch box Coast Live Oak. In the event, that the City's Arborist determines that
the location of the replacement tree is in conflict with the location of new street trees or
utility lines, an alternate location may be determined for it on the site, prior to final
occupancy of the proposed residence.
TM -2017-02, EA -2017-02, 22561 Alcalde Road April 12, 2018
R-2018-08, R-2018-09, TR -2018-05
Page 4 of 7
Two -Story Permits
The project includes two, Two Story Permit, applications for the development of the two
new lots (see Attachment 5). The elevations, building placement, and building sizes that
are illustrated are compatible with the existing neighborhood and consistent with the
development standards in Cupertino Municipal Code Chapter 19.28: Single -Family
Residential (R-1) Zones and the R1-7.5 zone. No design review is required for the proposed
two story homes.
Although not mandated to, the applicant has proposed to add privacy plantings in the
rear of the lot of both proposed parcels (adjoining the existing duplexes.) Further, the
replacement tree for the 37" Coast Live Oak to be removed (discussed previously) is
proposed to be the required front yard tree (36 -inch box Coast Live Oak) for Parcel B.
Environmental Review
A Draft Initial Study and Mitigated Negative Declaration (IS/MND) has been prepared
for the project (see Attachment 6) per the California Environmental Quality Act (CEQA.)
The Notice of Intent (NOI) to adopt a Mitigated Negative Declaration (MND) was placed
in the newspaper and mailed to notify neighbors and interested parties that a Draft
IS/MND has been prepared in accordance with the California Environmental Quality Act
(CEQA) and available for review. The public comment period to receive comments on
the Draft MND was between February 1, 2018 and February 21, 2018.
The IS/MND identifies mitigation measures in the following areas, which have been
added as conditions of approval_ to the draft resolutions, to reduce the potential
environmental impacts of the project to less than significant levels:
Biological Resources: Nesting surveys consistent with the federal Migratory Bird Treaty
Act and the California Department of Fish and Game Code are required.
® Hazards and Hazardous Materials: Prior to the issuance of the demolition permit, an
Asbestos and Lead assessment study will be conducted. Soil mediation measures will
be employed to reduce the pesticide and other soil contaminate levels as identified in
the soils report.
Soil Remediation: Phase I and Phase II environment assessments and additional reports
indicated elevated levels of lead, arsenic, and pesticides where samples were taken
from the site. The reports conclude these are most likely attributable to prior
agricultural and gardening uses. Since this contamination can lead to adverse impacts
if not corrected, the site must be remediated by removing and disposing the impacted
soil as prescribed by County of Santa Clara Environmental Health Department and
TM -2017-02, EA -2017-02, 22561 Alcalde Road April 12, 2018
R-2018-08, R-2018-09, TR -2018-05
Page 5 of 7
Soil Remediation Plan. A condition of approval has been added to require this prior to
any demolition or site disturbance activities.
On March 1, 2018, the Environmental Review Committee (ERC) recommended that the
approval authority find that the IS/MND for the project has been prepared in compliance
with CEQA and adopt the IS/MND and the Mitigation Monitoring and Reporting
Program (MMRP.)
Other Department/Agency Rview_
The City's Public Works Department and Cupertino Sanitary have reviewed the project
and have no objections. Their conditions have been incorporated as conditions of
approval in the draft resolutions.
In compliance with the Subdivision Map Act requirements, notices have been sent to the
two school districts that will serve the new parcels. However, no comments have been
received on the project as of the date of production of this staff report. The applicant will
be required to pay the appropriate school impact fees upon development of the lots with
homes.
Public Noticing and Outreach
The following table is a brief summary of the noticing done for this project:
■ One site sign posted on the site (at least 10
days prior to hearing)
■ Legal ad placed in the newspaper (at least 10
days prior to hearing)
■ 49 notices mailed to property owners within
300' of project site (10 days prior to hearing)
■ Posted on the City's official
notice bulletin board (one week
prior to hearing)
■ Posted on the City of
Cupertino's Web site (one week
to
As of the production of this report, staff has received comments from two neighboring
residents. Staff received comments from two neighbors (see Attachment 7.) Their
concerns and Staff responses are summarized below:
■ The construction activities from the development of the parcels will be an ongoing impact to
the neighboring residents: Construction related impacts to neighboring residents
generated by truck traffic, noise, parking, and dust are acknowledged and regulated
throughout the City of Cupertino"s Municipal Code, particularly within Title 10:
Public Peace, Safety, and Morals. Further, the project is conditioned to submit a
TM -2017-02, EA -2017-02, 22561 Alcalde Road
R-2018-08, R-2018-09, TR -2018-05
Paze 6 of 7
April 12, 2018
Construction Management Plan, Work Schedule, Erosion Control Plan, as well as
utilize Best Management Practices, as required by the State Water Resources Control
Board. Any violation of the above is considered a code violation subject to
enforcement by the City's Code Enforcement officers.
® The road should not be widened as it would encourage unsafe driving conditions and posing a
danger to neighboring residents: The road will not be widened but will rather be
improved within the existing Public Right -of -Way boundary. The 10' dedication will
be added to the existing Public Right -of -Way, accommodating a detached sidewalk,
curb and gutter, street trees, and pavement work similar to, the existing off-site
improvements in front of 22539 and 22519 Alcalde Road to the east of the project site.
Limit the development to a single story and maintain the trees along Alcalde Road: Two story
homes are allowed within the R177.5 zone as long as the application adheres. to the
prescriptive zoning standards outlined in Cupertino Municipal Code Chapter 19.28:
Single -Family Residential (R-1) Zones.
The trees located closest to Alcalde Road will be replaced to the satisfaction of the
Director of Public Works and shall be of a type approved by the City in accordance
with Ordinance No. 125.
Permit Streamlining Act:
This matter is adjudicatory and. is subject to the Permit Streamlining Act (Government
Code Section 65920 — 65964). The City has complied with the deadlines found in the
Permit Streamlining Act.
Project Received: October 11, 2017; Deemed ]incomplete: November 8, 2017;
Project Resubmitted: January 26, 2018; Deemed Complete: February 1, 2018
The City had 60 days, until, April 1, 2018 to make a decision on the project. However, the
applicant has acknowledged the later Hearing date without objection.
Conclusion:
Staff recommends approval of the Tentative Map, Two Story, and Tree Removal Permits
because the project is consistent with the General Plan, subdivision, protected tree, and
zoning ordinances, and conforms to the single-family residential development pattern,
in accordance with Chapters 14.18, 18.20, and 19.28 of the Cupertino Municipal Code.
TM -2017-02, EA -2017-02, 22561 Alcalde Road April 12, 2018
R-2018-08, R-2018-09, TR -2018-05
Page 7 of 7
Next Steas.
The Hearing Officer's decision on this project is final unless appealed within 14 calendar
days of the decision. The applicant may submit applications for grading and other
permits after the appeal period ends and may commence construction activities as soon
as the site remediation is complete.
The Tentative Map approval expires on April 12, 2020, while the Two Story and Tree
Removal Permits expire on April 12, 2019, at which time the applicant may apply for one-
year extensions.
Prepared by: Gian Paolo Martire, Associate Planner
Reviewed and Approved by: Piu Ghosh, Principal Planner
Attachments
1— Draft Resolution for EA -2017-03
2 — Draft Resolution for TM -2017-02
3 — Draft Resolution for R-2018-08 & R-2018-09
4 - Draft Resolution for TR -2018-05
5 - Plan set
6 - Initial Study, ERC Recommendation
7 — Public Comment
I ,�
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION NO. 88
OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO
TO ALLOW THE SUBDIVISION OF AN APPROXIMATELY .44 ACRE LOT INTO
TWO (2) PARCELS OF APPROXIMATELY 8,892 SQUARE FEET AT 22561 ALCALDE
ROAD (APN 342-29-063)
SECTION I: PROTECT DESCRIPTION
Application No.: TM -2017-02
Applicant: Cindy Hsu
Location: 22561 Alcalde Road (APN 342-29-063)
SECTION II: FINDINGS
WHEREAS, the City of Cupertino received an application to subdivide an approximately
.44 acre lot into two (2) parcels of approximately 8,892 square feet; and
WHEREAS, prior to the Administrative Hearing the Environmental Review Committee
heard the item on March 1, 2018 during which it reviewed the Draft Mitigated Negative
Declaration, received public comments, and recommended adoption of a Mitigated
Negative Declaration on a 5-0 vote; and
WHEREAS, on April 12, 2018 the Administrative Hearing Officer adopted the Initial
Study/Draft MND as the Final Initial Study/Mitigated Negative Declaration for the
project after adopting all the identified mitigation measures as conditions of approval for
the project; and
WHEREAS, the necessary notices have been given in accordance with the Procedural
Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held one
or more Public Hearings on this matter; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, the Administrative Hearing Officer finds:
Resolution No. 88 TM -2017-02 April 12, 2018
Page -2-
a. That the proposed subdivision map is consistent with the City of Cupertino General
Plan.
The subject property is consistent with the General Plan since the property is permitted to have
up to two dwelling units based on its land use designation of Low Density (1-5 DU/Ac.).
Additionally, the proposed lots are sized to be comparable to adjacent residential development,
and are compatible with the existing neighborhood lot orientation pattern. The lot acreage will
be consistent with the underlying single family residential standards proposed with a
minimum lot square footage of 7,500 square feet. The proposed subdivision is compatible with
the adjoining land uses and no physical constraints are present that would conflict with
anticipated land use development.
The proposed properties are designed to allow for future passive solar as the lot configurations
allow for a structure to be oriented in an east -west alignment for southern exposure.
Furthermore the design and improvement of the divided parcel does not result in any reduction
in allowable densities or percentage of a lot that may be occupied by a building in providing
for future passive solar provisions.
b. That the design and improvements of the proposed subdivision are consistent with
the General Plan.
The off-site improvements proposed with the project are identical to the existing improvements
adjacent to the subject site. These are consistent with the City's General Plan policies related
to pedestrian safety etc. by separating sidewalks from the street, minimizing curb -cuts and
requiring an urban canopy within the public right-of-way.
c. That the site is physically suitable for the type development contemplated under the
approved subdivision.
The proposed subdivision is compatible with the adjoining land uses and no physical
constraints are present that would conflict with anticipated land use development. There are
no topographical anomalies that differentiate this property from adjacent properties. The site
is located on the valley floor and the proposed two lot subdivision is typical of properties in the
neighborhood.
d. That the site is physically suitable for the intensity of development contemplated
under the approved subdivision.
The subject property is physically suitable in size and shape in conformance to development
standards and is appropriately configured to accommodate reasonably sized single-family
dwelling units.
e.That the design of the subdivision or the proposed improvements are not likely to
cause substantial environmental damage nor substantially and avoidable injure fish
and wildlife or their habitat.
Resolution No. 88 TM -2017-02 April 12, 2018
Page - 3 -
The proposed subdivision design and improvements are not likely to cause serious public health
problems nor substantially injure fish and wildlife or their habitat because the property is a
developed site and located in an urbanized area where residential land use is allowed.
f. That the design of the subdivision or the type of improvements associated therewith
are not likely to cause serious public health problems.
The proposed development is consistent with the existing adjacent residential development,
and the on-site and off-site improvements improve neighborhood walkability through new
detached sidewalk construction with size -appropriate driveway cuts and street and private
trees planting.
g. That the design of the subdivision and its associated improvements will not conflict
with easements acquired by the public at large for access through or use of property
within the proposed subdivision.
No easement or right-of-way exists currently that would be impeded or conflict with the
proposed subdivision.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence
submitted in this matter, subject to the conditions which are enumerated in this
Resolution beginning on Page 2 thereof, the application for a Tentative Map, Application
no. TM -2017-02, is hereby approved; and
That the subconclusions upon which the findings and conditions specified in this
Resolution are based and contained in the Public Hearing record concerning Application
no. TM -2017-02 as set forth in the Minutes of Administrative Hearing Meeting of April
12, 2018, and are incorporated by reference as though fully set forth herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPT.
1. APPROVED EXHIBITS
Approval is based on the plan set entitled; "Hsu Residence — Lot A," drawn by HMC
Associates, LLC dated August 18, 2017 consisting of sixteen (16) sheets labeled A-1.0
— A-4.0, L-1, TM -1, TH-2, and Boundary & Topographic Map; except as may be
amended by conditions in this resolution.
2. ACCURACY OF PROTECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks, property
size, building square footage, any relevant easements and/or construction records.
Resolution No. 88 TM -2017-02 April 12, 2018
Page -4 -
Any misrepresentation of any property data may invalidate this approval and may
require additional review.
3. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file nos. EA -2017-02, R-2018-08, R-2018-09,
and TR -2018-05 shall be applicable to this approval.
4. DEVELOPMENT ALLOCATION
The project is granted a development allocation of one unit from the Citywide
allocation.
5. BELOW MARKET RATE HOUSING PROGRAM
The applicant shall participate in the City's Below Market Rate (BMR) Housing
Program by paying the housing mitigation fees as per the Housing Mitigation
Manual. These fees will be assessed at the time of Building permit issuance for the net
new residential unit and any proposed accessory dwelling units.
6. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS
a. All grading activities shall be limited to the dry season (April 15 to October 1),
unless permitted otherwise by the Director of Public works.
b. Construction hours and noise limits shall be compliant with all requirements of
Chapter 10.48 of the Cupertino Municipal Code.
c. Grading, street construction, underground utility and demolition hours for work
done more than 750 feet away from residential areas shall be limited toMonday
through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m.
Grading, street construction, demolition or underground utility work within 750
feet of residential areas shall not occur on Saturdays, Sundays, holidays, and
during the nighttime period as defined in the Municipal Code.
d. Construction activities shall be limited to Monday through Friday, 7 a.m. to,
o 8 p.m.
and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities arenot allowed
on holidays as defined in Chapter 10.48 of the Municipal Code. Night time
construction is allowed if compliant with nighttime standards of Section 10.48 of
of the Cupertino Municipal Code.
e. Rules and regulations pertaining to all construction activities and limitations
identified in this permit, along with the name and telephone number of an
applicant appointed disturbance coordinator, shall be posted in a prominent
location at the entrance to the job site.
f. The applicant shall be responsible for educating all contractors and subcontractors
of said construction restrictions.
Resolution No. 88 TM -2017-02 April 12, 2018
Page - 5 -
The applicant shall annotate all permit plans with the above requirements and shall
comply with the above grading and construction hours and noise limit requirements
unless otherwise indicated.
7. CONSTRUCTION MANAGEMENT PLAN
Final map improvement plans shall include a construction management plan
detailing how construction activities will be conducted. The plan shall address, but
not be limited to the following activities:
a. Construction staging area (shall not occur within 15 feet of neighboring residential
property lines)
b. Construction schedule and hours
c. Construction phasing plan, if any
d. Contractor parking area
e. Tree preservation/protection plan
f. Site dust, noise and storm run-off management plan
g. Emergency/complaint and construction site manager contacts
8. DEMOLITION OF STRUCTURES
]prior to recordation of the final map, the applicant shall demolish and remove all
structures on the property. All demolished buildings and site materials shall be
recycled to the maximum extent feasible subject to the Building.Official. The applicant
shall provide evidence that materials will be recycled prior to issuance of demolition
permit.
9. GREEN BUILDING
The City recommends that the applicant incorporate green building measures into the
project. The green building measures may include but not be limited to: low VOC
paints, maximizing recycled building materials, solar efficiency/energy, energy
efficient windows/ appliances/mechanical equipment, maximizing onsite water
retention, and draught tolerant and pest resistant landscaping.
10. FENCES
All fencing on the site shall comply with Cupertino Municipal Code Chapter 19.48
Fences.
11. LANDSCAPE PROTECT SUBMITTAL
Prior to issuance of building permits, the applicant shall submit a landscape project
submittal per sections 14.15.040 or 14.15.050 of the Landscaping Ordinance if more
than 500 square feet of landscaping area is proposed. The Water -Efficient Design
Checklist (Appendix A of Chapter 14.15), Landscape and Irrigation Design Plans, and
Resolution No. 88 TM -2017-02 April 12, 2018
Page - 6 -
Water Budget Calculations shall be reviewed and approved to the satisfaction of the
Director of Community Development prior to issuance of building permits.
12. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible for consulting with other departments and/or agencies
with regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
13. EXPIRATION
The approval or conditional approval of the Tentative Map Subdivision shall expire
twenty four (24) months from the date of Administrative Hearing approval. An
extension or extensions may be approved as provided in Section 18.20.080.
14. INDEMNIFICATION
Except as otherwise prohibited by law, the applicant shall indemnify and hold
harmless the City, its City Council, and its officers, employees and agents (collectively,,
the "indemnified parties") from and against any claim, action, or proceeding brought
by a third party against one or more of the indemnified parties or one or more of the
indemnified parties and the applicant to attack, set aside, or void this Resolution or
any permit or approval authorized hereby for the project, including (without
limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense
of the litigation. The applicant shall pay such attorneys' fees and costs within 30 days
following receipt of invoices from City. Such attorneys' fees and costs shall include
amounts paid to counsel not otherwise employed as City staff and shall include City
Attorney time and overhead costs and other City staff overhead costs and any costs
directly related to the litigation reasonably incurred by City.
15. NOTICE OF FEES DEDICATIONS RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant to
Government Code Section 66020(d) (1), these Conditions constitute written notice of
a statement of the amount of such fees, and a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90 -day
approval period in which you may protest these fees, dedications, reservations, and
other exactions, pursuant to Government Code Section 66020(a), has begun. If you
fail to file a protest within this 90 -day period complying with all of the requirements
of Section 66020, you will be legally barred from later challenging such exactions.
Resolution No. 88 TM -2017-02 April 12, 2018
Page - 7 -
SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPT.
1. TRAFFIC IMPACT FEES
The Project will be subject to pay Traffic Impact Fees. The fee is $6,025 per new AM
or PM peak -hour trip generated by the Project prior to issuance of grading permits.
2. PARCEL MAP
Prior to approval of the Building permit, a Parcel Map will be required to be recorded
with the County Recorders, County of Santa Clara. Show any existing easements on
the map.
3. STREET IMPROVEMENTS & DEDICATION
Provide a street dedication in fee title and frontage improvements along the project to
the satisfaction of the Director of Public Works. Dedication shall be the full half -street
width, as indicated in the title report; prior to recordation of final reap.
Street improvements may include, but not be limited to, installation of new detached
sidewalk, driveways, curb & gutter, new pavement up to centerline, street trees,
underground overhead utilities, and relocation of utility pole and utility boxes.
4. STREET LIGHTING INSTALLATION
Street lighting shall be installed and shall be as approved by the Director of Public
Works. Lighting fixtures shall be positioned so as to preclude glare and other forms
of visual interference to adjoining properties, and shall be no higher than the
maximum height permitted by the zone in which the site is located.
5. GRADING & DRAINAGE
Grading shall be as approved and required by the Director of Public Works in
accordance with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications
and 404 permits- maybe required. Please contact Army Corp of Engineers and/or
Regional Water Quality Control Board as appropriate.
Any storm water overflows or surface sheeting should be directed away from
neighboring private properties and to the public right of way as much as reasonably
possible.
6. C.3 REQUIREMENTS
IREMENTS
C.3 regulated improvements may be required for projects creating and/or replacing
10,000 S.F. or more of impervious surface (collectively over the entire project site). The
developer shall reserve a minimum of 4% of developable surface area for the
Resolution No. 88 TM -2017-02 April 12, 2018
Page - 8 -
placement of low impact development measures, for storm water treatment, unless
an alternative storm water treatment plan, that satisfies C.3 requirements, is approved
by the Director of Public Works.
The developer must include the use and maintenance of site design, source control
and storm water treatment Best Management Practices (BMPs), which must be
designed per approved numeric sizing criteria. A Storm Water Management Plan,
Storm Water Facilities .Easement Agreement, Storm Water Facilities Operation and
Maintenance. Agreement, and certification of ongoing operation and maintenance of
treatment BMPs are each required.
7. IMPROVEMENT AGREEMENT
The project developer shall enter into a development agreement with the City of
Cupertino providing for payment of fees, including but not limited to checking and
inspection fees, storm drain fees, park dedication fees and fees for under grounding
of utilities. Said agreement shall be executed prior to issuance of construction
permits
Fees:
a. Checking & Inspection Fees:
Per current fee schedule ($3,648.00 or 5%
of improvement costs)
b. Grading Permit:
Per current fee schedule ($2,825.00 or 6%
of improvement costs)
c. Development Maintenance Deposit:
$1,000.00
d. Storm Drainage Fee:
Per current fee schedule ($4,550 per AC)
e. Traffic Impact Fee
$6,025 per new peak -hour trip generated
(1 peak hour trip being generated with current site plan).
f. Power Cost:
g. Parcel Map Fees:
Per current fee schedule ($5,527.90)
h. Park Fees:
Per current fee schedule ($84,000 per new
unit)
i. Street Tree Fees:
Per current fee schedule ($386.84 per
tree)
** Based on the latest effective PG&E rate schedule approved by the PUC
Bonds:
Faithful Performance Bond: 100% of Off-site and On-site Improvements
Labor & Material Bond: 100% of Off-site and On-site Improvement
Resolution No. 88 TM -2017-02 April 12, 2018
Page - 9 -
On-site Grading Bond: 100% of site improvements.
-The fees described above are imposed based upon the current fee schedule adopted
by the City Council. However, the fees imposed herein may be modified at the time
of recordation of a final map or issuance of a building permit in the event of said
change or changes, the fees changed at that time will reflect the then current fee
schedule.
8. UNDERGROUND UTILITIES
Developer shall comply with the requirements of the Underground Utilities
Ordinance No. 331 and other related Ordinances and regulations of the City of
Cupertino, and shall coordinate with affected utility providers for installation of
underground utility devices. Developer shall submit detailed plans showing utility
underground provisions. Said plans shall be subject to prior approval of the affected
Utility provider and the Director of Public Works.
9. WATER BACKFLOW PREVENTERS
Domestic and Fire Water Backflow preventers and similar above ground equipment
shall be placed away from the public right of way and site driveways to a location
approved by the Cupertino Planning Department, Santa Clara County Fire
Department and the water company.
10. BEST MANAGEMENT PRACTICES
Utilize Best Management Practices (BMPs), as required by the State Water Resources
Control Board, for construction activity, which disturbs soil. BMP plans shall be
included in grading and street improvement plans.
11. EROSION CONTROL PLAN
Developer must provide an approved erosion control plan by a Registered Civil
Engineer. This plan should include all erosion control measures used to retain
materials on site. Erosion control notes shall be stated on the plans.
12. WORK SCHEDULE
Every 6 months, the developer shall submit a work schedule to the City to show the
timetable for all grading/erosion control work in conjunction with this project.
Resolution No. 88 TM -2017-02 April 12, 2018
Page -10 -
13. STREET TREES
Street trees shall be planted within the Public Right of Way to the satisfaction of the
Director of Public Works and shall be of a type approved by the City in accordance
with Ordinance No. 125.
14. FIRE PROTECTION
Fire sprinklers shall be installed in any new construction to the approval of the City.
15. SANTA CLARA COUNTY FIRE DEPARTMENT
A letter of clearance for the project shall be obtained from the Santa Clara County Fire
Department prior to issuance of building permits. Clearance should include written
approval of the location of any proposed Fire Backflow Preventers, Fire Department
Connections and Fire Hydrants (typically Backflow Preventers should be located on
private property adjacent to the public right of way, and fire department connections
must be located within 100' of a Fire Hydrant).
16. SAN TOSE WATER COMPANY CLEARANCE
Provide San Jose Water Company approval for water connection, service capability
and location and layout of water lines and backflow preventers before issuance of a
building permit approval.
17. DEDICATION OF UNDERGROUND WATER RIGHTS
Developer shall "quit claim" to the City all rights to pump, take or otherwise extract
water from the underground basin or any underground strata in the Santa Clara
Valley.
18. SANITARY DISTRICT
A letter of clearance for the project shall be obtained from the Cupertino Sanitary
District prior to issuance of building permits.
19. UTILITY EASEMENTS
Clearance approvals from the agencies with easements on the property (including
PG&E, AT&T, and California Water Company, and/or equivalent agencies) will be
required prior to issuance of building permits.
SECTION V: CONDITIONS ADMINISTERED BY CUPERTINO SANITARY
1. CONNECTION PERMIT FEES
Connection permit fees, lateral disconnection fees, frontage fees, and acreage fees will
be required for the proposed lots during the Building Permit Phase.
Resolution No. 88 TM -2017-02 April 12, 2018
Page -11-
2. LATERAL & SEWER LINE CLEANOUT
Each lot shall have their own newly installed lateral and property line cleanout per
District's standards.
CITY ENGINEER'S CERTIFICATE OF
ACCEPTANCE OF ENGINEERING/ SURVEYING CONDITIONS
(Section 66474.18 California Government Code)
I hereby certify that the engineering and surveying conditions specified in Section IV. of
this Resolution conform to generally accepted engineering practices.
/s/Timm Borden
Timm Borden, Director of Public Works
City Engineer CA License 45512
PASSED AND ADOPTED this 12th day of April, 2018 at a noticed Public Hearing of the
Administrative Hearing Officer of the City of Cupertino, State of California, held by the
Director of Community Development, or his or her designee, pursuant to Cupertino
Municipal Code Section 19.12.120.
ATTEST:
/s/Gian Paolo Martire
Gian Paolo Martire
Associate Planner
APPROVED:
/s/BeW aurin Fu
Benjamin Fu
Asst. Director of Community Development
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION NO. 89
OF THE ADMINSTRATIVE HEARING OFFICER OF THE CITY. OF CUPERTINO
ADOPTING A MITIGATED NEGATIVE DECLARATION AND MITIGATION
MONITORING AND REPORTING PROGRAM TO SUBDIVIDE AN
APPROXIMATELY 0.44 -ACRE LOT INTO TWO (2) PARCELS OF APPROXIMATELY
8,892 SQUARE FEET AT 22561 ALCALDE ROAD (APN 342-29-063)
SECTION I: PROTECT DESCRIPTION
Application No: EA -2017-02
Applicant: Cindy Hsu
Location: 22561 Alcalde Road (APN: 342-29-063)
SECTION II: ENVIRONMENTAL REVIEW PROCESS
WHEREAS, the City of Cupertino received an application to subdivide an approximately
0.44 -acre lot into two (2) equal parcels of approximately 8,892 square feet; and
WHEREAS, pursuant to the provisions of the California Environmental Quality Act of
1970. (Public Resources Code Section 21000 et seq.) ("CEQA") together with the State
CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.)
(hereinafter, "CEQA Guidelines"), the City prepared an Initial Study and proposed
Mitigated Negative Declaration for the Project ("IS/MND"); and
WHEREAS, the Project is additionally described in the January 2018 "Alcalde Road Lot
Split Project" Draft Initial Study/Mitigated Negative Declaration ("Draft IS/MND"); and
WHEREAS, on February 1, 2018 the City issued a Notice of Intent to Adopt a Mitigated
Negative Declaration; and
WHEREAS, on February 1, 2018 the Draft IS/MND for the project was distributed to
responsible agencies and the public for review and comment for a 20 -day period that
ended February 21, 2018; and
WHEREAS, the IS/MND concluded that significant environmental effects on Biological
Resources, and Hazards and Hazardous Materials would be avoided or reduced to less -
than -significant levels by mitigation measures ("MM") identified in the IS/MND; and
Resolution No. 89 EA -2017-02 April 12, 2018
Page -2
WHEREAS, On March 1, 2018, prior to making any recommendations regarding the
adoption of the Draft IS/MND, the City of Cupertino's Environmental Review Committee
held a duly noticed public hearing to receive public testimony where it reviewed and
considered the information contained in the Draft IS/MND, voted 5-0-0 to recommend
that the Hearing Officer adopt the Draft IS/MND (EA -2017-02) and mitigation measures;
and
WHEREAS, the Administrative Officer has independently reviewed and considered the
IS/MND prior to taking action on the Project;
WHEREAS, on April 12, 2018 prior to taking action on the Project, the Administrative
Officer held a duly noticed public hearing to receive staff's presentation and public
testimony, and to further consider the information contained in the Final IS/MND, along
with all staff reports, other ,pertinent documents, and all written and oral statements
received prior to and at the public hearing.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony, staff reports, public
comments, and other evidence submitted in this matter, the Administrative Officer:
1. Finds that the Final IS/MND for the Project has been completed in compliance with
the CEQA and reflects the independent judgment and analysis of the City.
2. Finds that, on the basis of the whole record before it, there is no substantial evidence
that the Project as proposed and mitigated will have a significant effect on the
environment.
3. Adopts the Final Mitigated Negative Declaration (Final MND) for the Project.
4. Adopts the Mitigation Monitoring and Reporting Program for the Project, attached
hereto as Exhibit 1, and incorporated herein by reference, which incorporates all the
mitigation measures required under the Final MND. The Administrative Officer
further makes the mitigation measures required conditions of approval of the Project
to the extent they are within the responsibility and jurisdiction of the City as
summarized below:
a. BIOLOGICAL RESOURCES MITIGATION MEASURES
MM IV -1:
A pre -construction survey for nesting birds shall be conducted for the project site
and a 250 -foot radius around the project site by a qualified biologist not more than
two weeks prior to site disturbance during the breeding season (February 1 to
August 31). If site disturbance commences outside the breeding season, a pre -
construction survey for nesting birds are not required. If active nests of migratory
Resolution No. 89 EA -2017-02 April 12, 2018
Page -3
birds are not detected within approximately 250 feet of the project site, further
mitigation is not required. Results of the survey shall be submitted to the
Community Development Department.
If nesting raptors or other migratory birds are detected on or within 250 feet of the
site during the survey, a suitable construction -free buffer shall be established
around all active nests. The dimensions of the buffer shall be a minimum of 75 feet
for passerine birds and 250 feet for raptors. The buffer size may vary depending
on location and species. The buffer areas shall be enclosed with temporary fencing,
and construction equipment and workers" shall not enter the enclosed setback
areas. Buffers shall remain in place for the duration of the breeding season or until
a qualified biologist has confirmed that all chicks have fledged and are
independent of their parents.
b. HAZARDS AND HAZARDOUS MATERIALS MITIGATI®N MEASURES
MM V111-1:
Prior to issuance of any grading permits, the following measures shall be reflected
on the project grading and foundation plans, subject to review and approval by
the City Engineer:
® Six inches of soil shall be removed within the proposed landscape areas
along the northern and western boundaries of the project site. The
aforementioned landscape areas shall subsequently be capped with a
minimum of 0.5 feet of clean imported fill.
® The top six inches of soils removed within the ' aforementioned landscape
ureas shall be off -hauled by a licensed hazardous waste contractor (Class
A) and contractor personnel that have completed 40 -hour ®SHA hazardous
training, and shall be disposed of appropriately in accordance with
applicable federal, State, and local regulations associated with hazardous
waste.
The project applicant shall provide proof of implementation of the above measures
to the Community Development Department.
MM XVIII -2:
After demolition and removal of on-site structures and hardscapes, but prior to
initiation of grading, the applicant shall conduct additional soil sampling within
the previously inaccessible on-site areas to determine if the underlying soils
contain contaminants in excess of the applicable Environmental Screening Levels
(ESLs) set by the Regional Water Quality Control Board. The results of soil
Resolution No. 89 EA -2017-02 April 12, 2018
Page -4 --
sampling shall be submitted to the Community Development Department prior to
initiation of grading. If contaminants are not detected above applicable ESLs, then
further mitigation is not required. If contaminants are detected above the
applicable ESLs, then the soils shall be remediated by off -hauling to a licensed
landfill facility.
MM VIII -3o
Prior to issuance of a demolition permit for any on-site structures, the project
applicant_ shall consult with certified Asbestos and/or Lead Risk Assessors to
complete and submit for review to the Community Development Department an
asbestos and lead survey. If asbestos -containing materials or lead -containing
materials are not discovered during the survey, further mitigation related to
asbestos -containing materials or lead containing materials shall not be required. If
asbestos -containing materials and/or lead -containing materials are discovered by
the survey, the project applicant shall prepare a work plan to demonstrate how the
on-site asbestos -containing materials and/or lead -containing materials shall be
removed in accordance with current California Occupational Health and Safety
(Cal -OSHA) Administration regulations and disposed of in accordance with all
CalEPA regulations, prior to the demolition and/or removal of the on-site
structures. The plan shall include the requirement that work shall be conducted
by a Cal -OSHA registered asbestos and lead abatement contractor in accordance
with Title 8 CCR 1529 and Title 8 CCR 1532.1 regarding asbestos and lead training,
engineering controls, and certifications. The applicant shall submit the work plan
to the Community Development Department for review and approval. Materials
containing more than one (1) percent asbestos that is friable are also subject to
BAAQMMD regulations. Removal of materials containing more than one (1) percent
friable asbestos shall be completed in accordance with BAAQMD Section 11-2-303.
PASSED AND ADOPTED this 12th day of April, 2018 at a noticed Public Hearing of the
Administrative Hearing Officer of the City of Cupertino, State of California, held by the
Director of Community Development, or his or her designee, pursuant to Cupertino
Municipal Code Section 19.12.120.
ATTEST: APPROVED:
/s/Gian Paolo Martire /s/Benjamin Fu
Gian Paolo Martire Benjamin Fu
Associate Planner Asst. Director of Community Development
Exhibit EA -1
r � t
t 1 1 ® ! I
A
I i
22561 Alcalde Road
. (APN 341-29-063)
Impact
Mitigation Measure
Timeframe and
Responsibility for
Implementation
Method of Compliance
Oversight of
Implementation
BIOLOGICAL RESOURCES
IMPACT A - BI®
MM IST -1:
If construction
If grading and/or tree
Director of
Have a substantial
A pre -construction survey for nesting
activities and any
removal begins during the
Community
adverse effect, either
birds shall be conducted for the project
required tree, removal
stated dates in the
Development
directly or through
site and a 250 -foot radius around the
occur during the
mitigation measure, a final
habitat modifications,
project site by a qualified biologist not
breeding season
report of nesting birds,
on : any species
more than two weeks prior to site
(February 1 and
including any protection
identified as a
disturbance during the breeding
August 31), a qualified
measures, shall be
candidate, sensitive,
season (February 1 to August 31). If site
biologist (hired by the
submitted to the Director of
or special status
disturbance commences outside the
Project proponent)
Community Development
species in local or
breeding season, a pre -construction
shall conduct surveys
prior to the start of
regional plans,
survey for nesting birds are not
prior to tree removal
demolition and/or any
policies, or
required. If active nests of migratory
or construction
construction activity,
regulations, or by the
birds are not detected within
activities.
including grading.
California
approximately 250 feet of the project
Department of Fish
site, further mitigation is not required.
Preconstruction
and Game or U.S. Fish
Results of the survey shall be
surveys are not
and Wildlife Service?
submitted to the Community
required for tree
Development Department.
removal or
construction activities
If nesting raptors or other migratory
outside the nesting
birds are detected on or within 250 feet
period.
of the site during the survey, a suitable
construction -free buffer shall be
established around all active nests. The
dimensions of the buffer shall be a
minimum of 75 feet for passerine birds
and 250 feet for raptors. The buffer size
may vary depending. on location and
species. The bufferareas shall be
enclosed' with temporary fencing, and.
Impact
Mitigation Measure
Timeframe and
Method of Compliance
Oversight of
][responsibility for
Implementation
Implementation
construction equipment and workers
shall not enter the enclosed setback
areas. Buffers shall remain in place for
the duration of the breeding season or
until a qualified biologist has
confirmed that all chicks have fledged
and are independent of their parents.
HAZARDS AND HAZARDOUS MATERIA
.LS
IMPACT B — HAZ
1M[1M[ DTIII -1:
Prior to issuance of
The City Engineer shall
Director of
Create a significant
Prior to issuance of any grading
any grading permits,
review all project grading
Community
hazard to the public or
permits, the following measures shall
the applicant shall
and foundation plans for
Development and
the environment
be reflected on the project grading and
note the required
the noted measures prior to
City Engineer
through reasonably
foundation plans, subject to review and
measures on all
issuance of any grading
foreseeable upset and
approval by the City Engineer:
grading and
permits.
accident conditions
foundation plans.
involving the likely
Six inches of soil shall be
Proof of implementation of
release of hazardous.,
removed within the proposed
The required measures
the measures shall be
materials into the
landscape areas along the
shall be conducted by
provided to the
environment?
northern and western
a licensed hazardous
Community Development
boundaries of the project site.
waste contractor
Department upon
The aforementioned landscape
(Class A) and
completion.
areas shall subsequently be
contractor personnel
capped with a minimum of 0.5
that have completed
feet of clean imported fill.
40 -hour OSHA
® The top six inches of soils
hazardous training.
removed within the
aforementioned landscape
areas shall beoff-hauled by a
licensed hazardous _ waste
contractor (Class A) and
contractor personnel, that have
Impact
Mitigation Measure
Timeframe and
Responsibility for
Implementation
Method of Compliance
Oversight of
Implementation
completed 40 -hour OSHA
hazardous training, and shall
be disposed of appropriately in
accordance with applicable
federal, State, and local
regulations associated with
hazardous waste.
The project applicant shall provide
proof of implementation of the above
measures to the Community
Development Department.
MM VIII -2:
After demolition and
The results of soil sampling
Director of
After demolition and removal of on-
removal of on-site
shall be submitted to the
Community
site structures and hardscapes, but
structures and
Community Development
Development
prior to initiation of grading, the
hardscapes, but prior
Department prior to
applicant shall conduct additional soil
to initiation of
initiation of grading.
sampling within the previously
grading, the applicant
inaccessible on-site areas to determine
shall have additional
if the underlying soils contain
soil sampling
contaminants in excess of the
conducted.
applicable Environmental Screening
Levels (ESLs) set by the Regional Water
Quality Control Board. The results of
soil sampling shall be submitted to the
Community Development Department
prior to initiation of grading. If
_.
contaminants are not detected above
applicable ESLs, then further
mitigation is ' not required. If
contaminants are detected above the.
Impact
Mitigation Measure
'Timeframe and
Responsibility for
Implementation
Method of Compliance
Oversight of
Implementation
applicable ESLs, then the soils shall be
remediated by off -hauling to a licensed
landfill facility.
MM DTIII -3:
Prior to issuance of a
Results of the asbestos and
Director of
Prior to issuance of a demolition permit
demolition permit, a
lead survey shall be
Community
for any on-site, structures, the project
certified Asbestos
submitted for review to the
Development,
applicant shall consult with certified
and/or Lead Risk
Community Development
BAAQMD: Asbestos,
Asbestos and/or Lead Risk Assessors to
Assessor shall
Department prior to
Compliance &
complete and submit for review to the
complete an asbestos
issuance of grading and/or
Enforcement
Community Development Department
and lead survey of the
demolition permits.
an asbestos and lead survey. If
existing structures. If
asbestos -containing materials or lead-
asbestos -containing
If a work plan is required
containing materials are not discovered
materials and/or lead-
for the removal of asbestos -
during the survey, further mitigation
containing materials
or lead -containing
related to asbestos -containing
are discovered, the
materials, the applicant
materials or lead containing materials
project applicant shall
shall submit such work
shall not be required. If asbestos-
prepare a work plan to
plan to the Community
containing materials and/or lead-
demonstrate that
Development Department
containing materials are discovered by
removal of the
for review and approval
the survey, the project applicant shall
asbestos or lead-
prior to issuance of
prepare a work plan to demonstrate
containing materials
grading and/or demolition
how the on-site asbestos -containing
shall be conducted in
permits.
materials and/or lead -containing
compliance with Cal -
materials shallbe removed in
OSHA and CaIEPA
Should materials
accordance with current California
regulations.
containing more than one
Occupational Health and Safety (Cal-
percent asbestos that is
OSHA) Administration regulations
friable be identified in the
and disposed of in accordance with all
survey, the work plan for
CalEPA regulations, prior to: the
removal shall be prepared
demolition and/or removal of the on-
in compliance with
site structures. The plan shall include
BAAQMD regulations and
Impact
Mitigation Measure
Timeframe and
Responsibility for
Implementation
Method of Compliance
. Oversight of
Implementation
the requirement that work shall be
submitted to BAAQMD for
conducted by a Cal -OSHA registered
review prior to issuance of
asbestos and lead abatement contractor
grading and/or demolition
in accordance with Title 8 CCR 1529
permits.
and Title 8 CCR 1532.1 regarding
asbestos and lead training, engineering
controls, and certifications. The
applicant shall submit the work plan to
the Community Development
Department for review and approval.
Materials containing more than one (1)
percent asbestos that is friable are also
subject to BAAQMD regulations.
Removal of materials containing more
than one (1) percent friable asbestos
shall be completed in accordance with
BAAQMD Section 11-2-303.
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION NO. 90
OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO
TO ALLOW FOR THE CONSTRUCTION OF TWO 3,998 SQUARE FEET
TWO-STORY SINGLE FAMILY RESIDENCES ON TWO NEWLY CREATED
LOTS AT 22561 ALCALDE ROAD (APN 342-29-063)
SECTION I: PROTECT DESCRIPTION
Application No.: R-2018-08, R-2018-09
Applicant: Cindy Hsu
Location: 22561 Alcalde Road (APN: 342-29-063)
SECTION II: FINDINGS FOR A TWO-STORY PERMIT:
WHEREAS, the City of Cupertino received an application for Two -Story Permits as
described in Section I of this Resolution; and
WHEREAS, prior to the Administrative Hearing, the Environmental Review
Committee heard the item on March 1, 2018 during which it reviewed the Draft
Mitigated Negative Declaration, received public comments, and recommended
adoption of a Mitigated Negative Declaration on a 5-0 vote; and
WHEREAS, on April 12, 2018 the Administrative Hearing Officer adopted the Initial
Study/Draft MND as the Final Initial Study/Mitigated Negative Declaration for the
project after adopting all the identified mitigation measures as conditions of approval
for the project; and
WHEREAS, the necessary notices have been given in accordance with the Procedural
Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held
one or more Public Hearings on this matter; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, the Administrative Hearing Officer finds:
Resolution No. 90 R-2018-08, R-2018-09 April 12, 2018
Page - 2 -
a) The project is consistent with the Cupertino General Plan, any applicable specific
plans, zoning ordinance and the purposes of this title.
The proposed project is consistent with the General Plan as the project is within the Low
Residential (1-5 DU/acre) land use area. There are no applicable specific plans that affect the
project. The project has been found to be consistent with the requirements of Cupertino
Municipal Code Chapter 19.28 Single Family (R-1) Residential.
b) The granting of the permit will not result in a condition that is detrimental or
injurious to property or improvements in the vicinity, and will not be detrimental to
the public health, safety or welfare.
The granting of the permit will not result in a condition that is detrimental or injurious to
property improvements in the vicinity, and will not be detrimental to the public health,
safety or welfare as the project is located within the R1-7.5 (Single Family Residential)
zoning district, and will be compatible with the surrounding uses of the neighborhood.
c) The proposed project is harmonious in scale and design with the general
neighborhood.
The proposed project is located in a residential area consisting of .single family homes. The
proposed project maintains the single family home scale found compatible with the general
neighborhood.
d) Adverse visual impacts on adjoining properties have been reasonably mitigated.
Any potential adverse impacts on adjoining properties have been reasonably mitigated
through the installation of privacy protection plantings and front yard trees as required.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony, and other evidence
submitted in this matter, subject to the conditions which are enumerated in this
Resolution beginning on Page 2 thereof, the application for Two -Story Permits,
Application nos. R-2018-08 and R-2018-09, is hereby approved; and
That the subconclusions upon which the findings and conditions specified in this
Resolution are based and contained in the Public Hearing record concerning
Application nos. R-2018-08 and R-2018-09 as set forth in the Minutes of Administrative
Hearing Meeting of April 12, 2018, and are incorporated by reference as though fully set
forth herein.
Resolution No. 90 R-2018-08, R-2018-09 April 12, 2018
Page -4 -
submitted to the Community Development Department prior to final occupancy of
the residence.
7. LANDSCAPE PROTECT SUBMITTAL
Prior to issuance of building permits, the applicant shall submit a landscape project
submittal per sections 14.15.040 or 14.15.050 of the Landscaping Ordinance if more
than 500 square feet of landscaping area is proposed. The Water -Efficient Design
Checklist (Appendix A of Chapter 14.15), Landscape and Irrigation Design Plans,
and Water Budget Calculations shall be reviewed and approved to the satisfaction of
the Director of Community Development prior to issuance of building permits.
8. LANDSCAPE INSTALLATION REPORT
The project is subject to all provisions delineated in the Landscape Ordinance (CMC,
Chapter 14.15). A landscape installation audit shall be conducted by a certified
landscape professional after the landscaping " and irrigation system have been
installed. The findings of the assessment shall be consolidated into a landscape
installation report.
The landscape installation report shall include, but is not limited to: inspection to
confirm that the landscaping and irrigation system are installed as specified in the
landscape and irrigation design plan, system tune-up, system test with distribution
uniformity, reporting overspray or run-off . that causes overland flow; and
preparation of an irrigation schedule.
The landscape installation report shall include the following statement: "The
landscape and irrigation system have been installed as specified in the landscape
and irrigation design . plan and complies with the criteria of the ordinance and the
permit."
9. LANDSCAPE AND IRRIGATION MAINTENANCE
Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall
be established and submitted to, the Director of Community Development or his/her
designee, either with the landscape application package, with the landscape
installation report, or any time before the landscape installation report is submitted.
a) Schedules should take into account water requirements for the plant
establishment period and water requirements for established landscapes.
b) Maintenance shall include, but not be limited to the following: routine inspection;
pressure testing, adjustment and repair of the irrigation system; aerating and de -
thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of failed
plants; weeding; pest control; and removing obstructions to emission devices.
Resolution No. 90 R-2018-08, R-2018-09 April 12, 2018
Page 5 -
c) Failed plants shall be replaced with the same or functionally equivalent plants
that may be size -adjusted as appropriate for the stage of growth of the overall
installation. Failing plants shall either be replaced or be revived through
appropriate adjustments in water, nutrients, pest control or other factors as
recommended by a landscaping professional.
10. EXTERIOR BUILDING MATERIALS/TREATMENTS
Final building exterior treatment plan (including but not limited to details on
exterior color, material, architectural treatments and/or embellishments) shall be
reviewed and approved by the Director of Community Development prior to
issuance of building permits. The final building exterior plan shall closely resemble
the details shown on the original approved plans. Any exterior changes determined
to be substantial by the Director of Community Development shall require a minor
modification approval with neighborhood input.
11. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
12. INDEMNIFICATION
Except as otherwise prohibited by law, the applicant shall indemnify and hold
harmless the City, its City Council, and its officers, employees and agents
(collectively, the "indemnified parties') from and against any claim, action, or
proceeding brought by a third party against one or more of the indemnified parties
or one or more of the indemnified parties and the applicant to attack, set aside, or
void this Resolution or any permit or approval authorized hereby for the project,
including (without limitation) reimbursing the City its actual attorneys' fees and
costs incurred in defense of the litigation. The applicant shall pay such attorneys'
fees and costs within 30 days following receipt of invoices from City. Such attorneys'
fees and costs shall include amounts paid to counsel not otherwise employed as City
staff and shall include City Attorney time and overhead costs and other City staff
overhead costs and any costs directly related to the litigation reasonably incurred by
City.
13. NOTICE OF FEES; DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant to
Government Code Section 66020(d) (1), these Conditions constitute written notice of
Resolution No. 90 R-2018-08, R-2018-09 April 12, 2018
Page - 6 -
a statement of the amount of such fees, and a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90 -day
approval period in which you may protest these fees, dedications, reservations, and
other exactions, pursuant to Government Code Section 66020(a), has begun. If you
fail to file a protest within this 90 -day period complying with all of the requirements
of Section 66020, you will be legally,barred from later challenging such exactions.
PASSED AND ADOPTED this 12th day of April, 2018 at a noticed Public Hearing of the
Administrative Hearing Officer of the City of Cupertino, State of California, held by the
Director of Community Development, or his or her designee, pursuant to Cupertino
Municipal Code Section 19.12.120.
ATTEST:
/s/Gian Paolo Martire
Gian Paolo Martire
Associate Planner
APPROVED:
/s/Benjamin Fu
Benjamin Fu
Asst. Director of Community Development
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION NO. 91
OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO
TO ALLOW THE REMOVAL AND REPLACEMENT OF A PROTECTED 37" COAST
LIVE OAK TREE TO FACILITATE THE CONSTRUCTION OF A NEW SINGLE
FAMILY HOME AT 22561 ALCALDE ROAD (APN 342-29-063)
SECTION I• PROTECT DESCRIPTION
Application No.: TR -2018-05
Applicant: Cindy Hsu
Location: 22561 Alcalde Road (APN 342-29-063)
SECTION II: FINDINGS
WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an
application for a Tree Removal Permit as described in Section I of this Resolution; and
WHEREAS, prior to the Administrative Hearing, the Environmental Review
Committee heard the item on March 1, 2018 during which it reviewed the Draft
Mitigated Negative Declaration, received public comments, and recommended
adoption of a Mitigated Negative Declaration on a 5-0 vote; and
WHEREAS, on April ,12, 2018 the Administrative Hearing Officer adopted the Initial
Study/Draft MND as the Final Initial Study/Mitigated Negative Declaration for the
project after adopting all the identified mitigation measures as conditions of approval
for the project; and
WHEREAS, the necessary notices have been given in accordance with the Procedural
Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held
one or more Public Hearings on this matter; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
Resolution No. 91 TR -2018-05 April 12, 2018
Page 2
WHEREAS, the Administrative Hearing. Officer finds:
1. That the location of the trees restricts the economic enjoyment of the property by
severely limiting the use of property in a manner not typically experienced by
owners of similarly zoned and situated property, and the applicant has
demonstrated to the satisfaction of the approval authority that there are no
reasonable alternatives to preserve the tree(s);
The 37" Coast Live Oak at its location on the newly formed lot (Lot B) is situated in a
location on the parcel that would severely restrict a reasonably sized home, as compared to
the surrounding neighborhood, f om being built. The City's Municipal Code allows removal
of such trees as long as appropriate replacements are planted.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence
submitted in this matter, the Application No. TR -2018-05, is hereby approved; and
That the subconclusions upon which the findings and conditions specified in this
Resolution are based and contained in the public hearing record concerning Application
TR -2018-05 as set forth in the Minutes of the Administrative Hearing Meeting of April
12, 2018, and are incorporated by reference herein.
.SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the arborist report entitled, "Arborist Report, Evaluation of a
Coast Live Oak Tree at: 22561 Alcalde Road, Cupertino," prepared by Kurt Fouts
(#WE -0681A), dated February 8, 2018 consisting of eleven (11) sheets inclusive of a
landscape plan; except as may be amended by conditions in this resolution.
2. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file nos. TM -2017-02 (EA -2017-02), R-
2018-08, and R-2018-09, shall be applicable to this approval.
3. TREE REPLACEMENT SIZE AND LOCATION
The applicant shall plant, at a minimum, a 36 -inch box Coast Live Oak tree in the
front yard of Lot B to the satisfaction of the City, in consultation with the City's
arborist for the tree proposed to be removed in conformance to the replacement
guidelines per Cupertino Municipal Code Section 14.18.160. The size of the
Resolution No. 91 TR -2018-05 April 12, 2018
Page 3
proposed replacement trees shall be consistent with the City's Protected Tree
Ordinance unless deemed infeasible by the City's Consulting Arborist:
a. Diameter of trunk size of removed tree up to 12 inches shall be replaced with
one 24 -inch box tree;
b. Over 12 inches and up to 36 inches shall be replaced by two 24 -inch box tree
or one 36 -inch box tree; and
c. Over 36 inches shall be replaced with one 36 -inch box tree.
If it is determined that it is physically not feasible to plant the required replacements
trees, the Applicant may pay in -lieu fees determined to be appropriate by the
Community Development Director.
4. ARBORIST REVIEW
Prior to building permit issuance, the number, location and species of trees shall be
reviewed and approved by the City in consultation with the City's Arborist.
The replacement trees shall be planted prior to building permit final. The Applicant
shall provide the Department of Community Development adequate
documentation, including, but not limited to, photographs, receipts or invoices, to
verify that replacements have been planted. The City's consulting arborist shall
inspect the trees after planting and a report ascertaining the good, health of the trees
mentioned above shall be provided prior to issuance of final occupancy.
5. PROTECTED TREES
The applicant understands that the replacement trees may not be removed without a
Tree Removal Permit and that they shall be responsible for ensuring the proper
maintenance and care of the trees. The applicant shall also disclose the location and
species of all replacements trees on site upon sale of the property.
6. INDEMNIFICATION
Except as otherwise prohibited by law, the applicant shall indemnify and hold
harmless the City, its City Council, and its officers, employees and agents
(collectively, the "indemnified parties") from and against any claim, action, or
proceeding brought by a third party against one or more of the indemnified parties
or one or more of the indemnified parties and the applicant to attack, set aside, or
void this Resolution or any permit or approval authorized hereby for the project,
including (without limitation) reimbursing the City its actual attorneys' fees and
costs incurred in defense of the litigation. The applicant shall pay such attorneys'
fees and costs within 30 days following receipt of invoices from City. Such attorneys'
fees and costs shall include amounts paid to counsel not otherwise employed as City
staff and shall include City Attorney time and overhead costs and other City staff
Resolution No. 91 TR -2018-05 April 12, 2018
Page 4
overhead costs and any costs directly related to the litigation reasonably incurred by
City.
7. NOTICE OF FEES DEDICATIONS RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant to
Government Code Section 66020(d) (1), these Conditions constitute written notice of
a statement of the amount of such fees, and a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90 -day
approval period in which you may protest these fees, dedications, reservations, and
other exactions, pursuant to Government Code Section 66020(a), has begun. If you
fail to file a protest within this 90 -day period complying with all of the requirements
of Section 66020, you will be legally barred from later challenging such exactions.
PASSED AND ADOPTED this 12th day of April, 2018 at a noticed Public Hearing of the
Administrative Hearing Officer of the City of Cupertino, State of California, held by the
Director of Community Development, or his or her designee, pursuant to Cupertino
Municipal Code Section 19.12.120.
ATTEST:
/s/Gian Paolo Martire
Gian Paolo Martire
Associate Planner
APPROVED:
/s/Benjamin Fu
Benjamin Fu
Asst. Director of Community Development
IIrLIORU REM BENC E
QL07 A�
22561 ALC ALDE RDD
CUFERCrmao CA. 95014
DRAWING INDEX
A-1.0 SITE /LANDSCAPE PLAN
A-1.1 DEMOLITION PLAN
A-2.0 FLOOR PLANS
A-3.0 ELEVATIONS
A-4.0 SECTIONS & ROOF
C-0.0 SURVEY MAP
SCOPE OF WORKS:
1. DEMOLRION UNDER SEPARATE PERMR.
2. PROPOSED A NEW TWO STORY SINGLE FAMILY DWELLING
W/ ATTACHED GARAGE
3. OBTAIN J NUMBER FROM THE BAAOMD FOR DEMOLITION
OF EX. BLDG
PROJECT DATA:
1. LOT SIZE: 8,892 S.F. APN 342-29-063
2. ZONING: 131-7.5, (2ND FLOOR SET BACK: 15ft MIN.)
3. CONSTRUCTION TYPE: V -BTW/ FULL FIRE SPRINKLER)
OCCUPANCY GROUP: R-3.0 (2 STORY BLDG)
4. BLDG CODES: 2016 California Residential Codes
5. BLDG AREA:
2ND FL. AREA: 1,227.0 SFA
1 ST FL. AREA: 2,298.0 SF. (B)
GARAGE AREA 472.5 SF (C)
TOTAL BLDG AREA: 3,997.5 SF
(FRONT PORCH)104+(REAR PORCH)375 SF+264(CARPORT)=743 SF(E)
1ST FL. 24" EAVE AREA 535 S.F. (F
6, 2ND FL. TO 1ST FL. AREA RATIO: A/(B+C)=44.29%
7, LOT COVERAGE : (B+C+E+F) 4048.5/ 8,892 = 45.53%
B. FAR: 3997.5 / 8,892 = 44.96%
9. FRONT YARD IMPERVIOUS AREA RATIO:
30.87% (SEE SHEET A1.1 FOR DETAILS)
10. EX. HOUSE(2520sf) BASEM'T(2520sf),GAR.(506sf),1962 BUILT
11. CITY CONTACT: ERICK SERRANO
TEL:408-777-3250, E-MAIL: ericks@cupertino.org
12. THE DEADLINE FOR THE SUBMISSION OF PUBLIC COMMENTS
SHALL BE ((TWO WEEKS AFTER THE DATE OF THE NOTICE
AN PELECEDCOPY OF THE PIATJ§ 2Is 1AVAILABLE BY REQUEST.
VINICITY MAP
'M
_/ I"!
Application M@3r ber �
Gd s@ rt1 3F L:1T �!
2 -ARBUTUS MARIA 015' O.C. \
(OR APPROVED EQ. -SEE NOTES 1/A-1)
88.92'
26" 0 30"
\0
\ N
INE PORCH
PN
10 11i►e�e�e�eeeee�e�e�e�e�e�eee�eee�eee�l
\��eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee�
�►eoeeeseeeeeeeeeeel
oeieieieieieieeeoeieieieieieieiei�
leeeeeeeeeeeeeeeef�
\I►eeeeeeeoeeeeeeeee .
. ♦eeeeeeeeeeeeeeee�i\ � �
lid►oeeee_e_e_�_�_�_o_o_�_�eee,�
.eeef : ♦ee���
�seef �. ♦eef�__ \ ��eeeeee� � � ��eeeee®vee+♦�
gee . .►eeeee♦
7'_ 12'_7"
l
CARPORT
9'
I
Driveway
0
N I
2 8 .9 2' - - - -
10ft Street Dedication
I
0
SITE PLAN S11•=10' -O'
10 0 10 20 30
_ CTR OF STREET
-- -NOTES: -- -- -- -- -- -- -- --
1. Calgreen checklist shall be included as a part of construction documents.
2. Prior to issuance of bldg permit, the Landscape Water -Efficiency Checklist
In Appendix A of Chapter 14.15 will need to be filled out.
3. LANDING IN THE SIDE YARD SHALL NOT EXCEED 18" ABOVE FIN. GRADE.
MI �.
MC
S
MC
O TS
AS NOTED
ecA1E
AS NOTED
pipp
A-1.0
0�T
z
� a
z
d
oud
F � U
U �Cd7v
aC:
o
� F W
rsuwly ,
MC
MC
O TS
AS NOTED
ecA1E
AS NOTED
A-1.0
0�T
APPROVAL -
Appl t i n Niu bor
DRC/&/
Dates
fL
I
I FRONT YARD PAV'G CALS: I
Driveway Front Yard Area: S:1'=10'-0"
p 88.92 X 20 = 1,778 sf
Paving Area:
574+62+48= 684 sf
Paving ratio at Front Yard:
II II 684/ 1778= 38.47% _
88.92'
2ND FLOOR AREA CALS i =lo•�
FLOOR PLAN AREA CALCULATION:
SECTION DIMENSIONS
AREA
A 31X19
588.1
B 28X11
308,8
C 5.5X13
71.5
D 12X5.5
66
E 7X1.5
10.5
F 13.5X13.5
182
2nd FLOOR AREA
1,227 S.F.
G 16.3X23
375
H 17.83X33
589A
J 41.5X20.5
850.7
K 43:5X21
913.3
L 21X2
42.1
1st FLOOR AREA
2,770.5 S.F.
TOTAL FLOOR AREA
3'997.5 S.F.
M 38,83X13,5
524.8
N - 16.3X23
409.5
P 21X19.5
375
BASEMENTAREA
1,309 S.F.
muvvN
MC
a�a®
MC
care.
AS NOTED
e :nom
A-1�1
a �-r
1 ST FLOOR P LAN —A sl 1/4'=i' -o'
APPRONAL
Applaanation Nunber
DRClA q -
iasis kliane�t`l
I / /
9 1 12
/ — TTP
1_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
I
c
I
o . 7 —6'
PL
o \
I \
12 \
TYP. 3.5 \ \
2ND FL N \
N
Si 1/4'=V-0'
Note:
1. The property owner shall record a covenant on the property
for the new and existing privacy trees and the required
front yard tree.
2. Following completion of construction, an affadavit from an
ISA -certified arborist shall be provided confirming that the
new trees have been planted properly and according to plan,
and that the existing trees to remain are in good health.
3. A planning Division inspection is required to verify exterior
material/ finishes, trees, landscaping and site work.
ELEVATION NOTES,
O1 ROOF: LONG. TILE.ROOF ('MONIER UFE TILE' ESR1647-ICC ES CO. OR
APPRO. E0.) ON 30 LB BLDG FELT OVER PLYWOOD SHEATING.
O-5''. 26 GA. G.I. PROFILE GUTTER ON 2X8 S4S SURFACE FASCIA BOARD
WITH DOWNSPOUT AT PROPER LOCATIONS (ALL ROOF DRAINS SHALL
BE DRAINED: TO STREET DIRECTLY)
O DOUBLE GLAZED WINDOWS (TYP.)
® CUSTOM SOLID CORE DOORS.
O 3 -COAT CEMENT PLASTER IN 17 GA. STUCCO NETTING ON 2 LAYERS
GRADE.'0' BI.DGPAPER. (WITH 26 GA. G.I. 7 FLASHING AT TOP
EDGE OF BLDG PAPER),
O RECESSED WINDOW,
O SCREEN VENT WITH 1/4' WIRED MESH (TYP.)
Q WEEP SCREED (TYP.)
O ORNAMENTAL G.T. CHIMNEY CAP WITH APPROVED SPARK ARRESTOR.
® CUSTOM WOOD SHUTTER
Note:
Any proposed changes to the approved colors and materials
on this subject shall be reviewed by the City of Cupertino
Planning Division prior to installation/ application.
Wi4Yvn1
MC
cF�
MC
Dare
AS NOTED
eca�
AS NOTED
Uw INa
�T
A-3.0
IL 3F er re
}
N I U
U
S
W
t: N
b
� U
a � � G
V m
oa �
I��a
N Naafi
Si 1/4'=V-0'
Note:
1. The property owner shall record a covenant on the property
for the new and existing privacy trees and the required
front yard tree.
2. Following completion of construction, an affadavit from an
ISA -certified arborist shall be provided confirming that the
new trees have been planted properly and according to plan,
and that the existing trees to remain are in good health.
3. A planning Division inspection is required to verify exterior
material/ finishes, trees, landscaping and site work.
ELEVATION NOTES,
O1 ROOF: LONG. TILE.ROOF ('MONIER UFE TILE' ESR1647-ICC ES CO. OR
APPRO. E0.) ON 30 LB BLDG FELT OVER PLYWOOD SHEATING.
O-5''. 26 GA. G.I. PROFILE GUTTER ON 2X8 S4S SURFACE FASCIA BOARD
WITH DOWNSPOUT AT PROPER LOCATIONS (ALL ROOF DRAINS SHALL
BE DRAINED: TO STREET DIRECTLY)
O DOUBLE GLAZED WINDOWS (TYP.)
® CUSTOM SOLID CORE DOORS.
O 3 -COAT CEMENT PLASTER IN 17 GA. STUCCO NETTING ON 2 LAYERS
GRADE.'0' BI.DGPAPER. (WITH 26 GA. G.I. 7 FLASHING AT TOP
EDGE OF BLDG PAPER),
O RECESSED WINDOW,
O SCREEN VENT WITH 1/4' WIRED MESH (TYP.)
Q WEEP SCREED (TYP.)
O ORNAMENTAL G.T. CHIMNEY CAP WITH APPROVED SPARK ARRESTOR.
® CUSTOM WOOD SHUTTER
Note:
Any proposed changes to the approved colors and materials
on this subject shall be reviewed by the City of Cupertino
Planning Division prior to installation/ application.
Wi4Yvn1
MC
cF�
MC
Dare
AS NOTED
eca�
AS NOTED
Uw INa
�T
A-3.0
IL 3F er re
o
I
4
}
N I U
U
Q�
C7 c
Z W v
rn
F
m F�d
N C4I
COU [RE000000
22561 QLOALID0 X100 300"TREE
C LIFER mol CA. g)5014
VINICITY MAP
¢g
is
J
2
Z U
W
4I W
N
10" 1Oft Street Dedication
`v-'!
In
2—ARBUTUS MARIA 015' O.C.
(OR APPROVED EQ.—SEE NOTES 1/A-1)
3.92' /
PORCH
BLDG—A
2nd FLOOR
PORCH
rlvewa
WE
' r - SITE PLAN SI 1•=10'-D•
10 0 10 20 30
CTR OF STREET
_ 1. Calgreen checklist shall be included as a part of construction documents.
2. Prior to issuance of bldg permit, the Landscape Water—Efficiency Checklist
'ger in Appendix A of Chapter 14.15 will need to be filled out.
3. LANDING IN THE SIDE YARD SHALL NOT EXCEED 18" ABOVE FIN. GRADE.
n
22'-1"
I
I
I
I
F, 1
I
I
I
I
I
O
DRAWING INDEX
PROJECT DATA:
ctra�®
MC
1. LOT SIZE: 8,892 S.F. APN 342-29=063
AS NOTED
2. ZONING: Ri-7.5, (2ND FLOOR SET BACK: 15ft MIN.)
A-1.0 SITE PLAN
3. CONSTRUCTION TYPE: V—B W/ FULL FIRE SPRINKLER)
A-2.0 FLOOR PLANS
OCCUPANCY GROUP: R -3f U (2 STORY BLDG)
A-1.0
OF
A-2.1 2ND FLOOR & ROOF N
4. BLDG CODES: 2016 California Residential Codes
A-3.0 ELEVATIONS
5. BLDG AREA:
2ND FL AREA: 1,227.0 SF ((A
A-4.0 SECT[
1ST FL. AREA: 2,298.0 SF. (B�
GARAGE AREA 472.5 SF (C)
TOTAL BLDG AREA: 3,997.5 SF
(FRONT PORCH)104+(REAR PORCH)375 SF+264(CARPORT)=743
SCOPE OF WORKS:
1ST FL 24" EAVE AREA 535 S.F. (F
6, 2ND FL. TO 1ST FL AREA RATIO: A/ B+C)=44.297
7. LOT COVERAGE : (B+C+E+F) 4048.5/ 8,892 = 45.53%
1. DEMOLITION UNDER SEPARATE PERMIT.
B. FAR: 3997.5 / 8,892 = 44.96%
2. PROPOSED A NEW TWO STORY SINGLE FAMILY DWELLING
9. FRONT YARD IMPERVIOUS AREA RATIO:
W/ ATTACHED GARAGE.
30.87% (SEE SHEET A1.1 FOR DETAILS)
10. EX. HOUSE(2520sf),BASEM'T(2520sf),GAR.(506sf),1962 BUILT
3. OBTAIN J NUMBER FROM THE BAAQMD FOR DEMOLITION
11. CITY CONTACT: ERICK SERRANO
OF EX. BLDG
TEL -408-777-3250, E—MAIL: ericks®cupertino.org
12. THE DEADLINE FOR THE SUBMISSION OF PUBLIC COMMENTS
SHALL BE WEEKS AFTER THE DATE OF THE NOTICE
(TWO
AN PELEC DCOPY OF THE PLANS` ?S 1AVAILABLE BY REQUEST.
VINICITY MAP
¢g
is
J
2
Z U
W
4I W
N
10" 1Oft Street Dedication
`v-'!
In
2—ARBUTUS MARIA 015' O.C.
(OR APPROVED EQ.—SEE NOTES 1/A-1)
3.92' /
PORCH
BLDG—A
2nd FLOOR
PORCH
rlvewa
WE
' r - SITE PLAN SI 1•=10'-D•
10 0 10 20 30
CTR OF STREET
_ 1. Calgreen checklist shall be included as a part of construction documents.
2. Prior to issuance of bldg permit, the Landscape Water—Efficiency Checklist
'ger in Appendix A of Chapter 14.15 will need to be filled out.
3. LANDING IN THE SIDE YARD SHALL NOT EXCEED 18" ABOVE FIN. GRADE.
n
22'-1"
I
I
I
I
F, 1
I
I
I
I
I
O
Mc
ctra�®
MC
AS NOTED
a�ntE
AS NOTED
.iw nla
A-1.0
OF
ear
HEE"re
I
Driveway
A 31X19
588.1
FRONT YARD PAV'G CALS: I
- Fmnt Yard Area:
308.8
C 5.5X13
71.5
D 12X5.5
66
O
88.92X20=1,778 sf
F 13.5X13.5
182
2nd FLOOR AREA
N
Paving Area:
574+62+48=684 sf I
I
I I
H 17.83X33
589.4
Paving mlio at Front Yard:
684/ 1778= 38.47
850.7
88.92'
913.3
L I 21X2
APPROVAL
1 st FLOOR AREA
� `
DR,C
`
Application Number
3'997.5 S.F.
Date
524.8
Signadiure
409.5
P 21X19.5
375
I G sI— ager
1ST FLOOR AREA CALS 1,10 -.o -
ND FLOOR AREA CALS 1�1o.
FLOOR PLAN AREA CALCULATION:
SECTION DIMENSIONS
AREA
A 31X19
588.1
B 28X11
308.8
C 5.5X13
71.5
D 12X5.5
66
E 7X1.5
10.5
F 13.5X13.5
182
2nd FLOOR AREA
1,227 S.F.
G 16.3X23
375
H 17.83X33
589.4
J 41.5X20.5
850.7
K 43.5X21
913.3
L I 21X2
42.1
1 st FLOOR AREA
2,770.5 S.F.
TOTAL FLOOR AREA
3'997.5 S.F.
M 38.83X13.5
524.8
N 16.3X23
409.5
P 21X19.5
375
BASEMENTAREA
1,309 S.F.
ALCALDE ROAD
DEMOLITION 'PLAN g ,D. -D.
1. ALL OIJ-n0 IMPROVEMENT E UNDER S BE REMOVED
2. ALL EXIST.
SHALL 8E UNDER SEPARATED PERMIT.
3. ALL EX UTILITIES SHALL HE RELOCATED.
CONC C/G
9 IST FLOOR P LAN — B s, 1/4"=1'-0"
I
I
I
I
I
I
I
o
U
S
CL
s^✓as
AS NOTED
A-2.0
0
z � o
Rai � o
A
COz
p�,
'fid
o
o
� V
v .�
0
CEJ OHo� '
v
MO
o-®®
MO
AS NOTED
s^✓as
AS NOTED
A-2.0
m-�-r
Ir
ll't -,,'?Dt 1- t
1'
APPROVAL
2ND FLOOR PLAN -B S: 1/4"=1'-0"
El-- EF
PORCH
U/To
�2 >
UA7
oz
-4
-Z
P
0 P
I
4/12
co
G
4 0
zM,
4/12
V 4/12
I
o
Q
< iz: >
CN
Q
4)12
u
� 6
�7 3.5/12
UI Z
3/12 C/)P.4
0
F
PORCH 3.5/12
Cl)
ROOF PLAN -B
I
9 /
/ la
/ 3.5 FM
I j /
2ND L"
pwpmamz��Ism
4
P
I b
I I
N
°o n n n
T
ND FL
I I
01 c
—
� 6® i
I
WEST ELEVATION -B Si 1/4•=1-0•
12 4.9
77M -7
APPT, IL VAL " -A -06,_U � - - - - - - - - - - -
l
Application Number LJ LJ U
/ Dago
Ng it ire
�.%� sty ori;�n� �;r� •rv�l .s
LP
_ 2ND FL \ \
\ I
1ST FL
— — a
:r
Note:
1. The property owner shall record a covenant on the property
for the new and existing privacy trees and the required
front yard tree.
2. Following completion of construction, an affadavit from an
ISA -certified arborist shall be provided confirming that the
new trees have been planted properly and according to plan,
and that the existing trees to remain are in good health.
3. A planning Division inspection is required to verify exterior
material/ finishes, trees, landscaping and site work.
ELEVATION NOTESi.
O ROOF: CONC. TILE ROOF ('MONIER UFETILE' ESR1647-ICC ES CO. OR
APPRO. EQ.) ON 2-30 LB BLDG FELT OVER PLYWOOD SHEATING.
O2 5" 26 GA. G.I. PROFILE GUTTER ON 2X8 S4S SURFACE FASCIA BOARD
WITH DOWNSPOUT AT PROPER LOCATIONS (ALL ROOF DRAINS SHALL
BE DRAINED TO LANDSCAPE AREA)
O DOUBLE GLAZED WINDOWS (TYP.)
O CUSTOM SOLID CORE DOORS.
O 3- COAT CEMENT PLASTER IN 17 GA. STUCCO NETTING ON 2 LAYERS
GRADE V BLDG PAPER. (WITH 26 GA. G.I. 'Z' FLASHING AT TOP
EDGE OF BLDG PAPER).
O RECESSED WINDOW,
O SCREEN VENT WITH 1/4" WIRED MESH (TYP.)
O WEEP SCREED (TYP.)
O ORNAMENTAL G.I. CHIMNEY CAP WITH APPROVED SPARK ARRESTOR.
Op CUSTOM WOOD SHUTTER
Note:
Any proposed changes to the approved colors and materials
on this subject shall be reviewed by the City of Cupertino
Planning Division prior to installation/ application.
�I
• I
' I
o�
2ND LN I
I
I
IST F
05/10/'17
PRMUM. DESIGN REVIEW
8/18/'17
DESIGN REVIEW COMMENT;
4 J
�tivH
MC
o�c-cl®
MC
Dore
AS NOTED
was
AS NOTED
.roe rVa
ear
A-3.0
I
N
I I
12
120 In o 13 1Y -T —YP-. 3
/ N 3.5jT4P: j
2ND F L-- --
--N _- ---------N --- ----------------------- - \
-----_-_- _ - 0000
• 0' iD o
0 20'-1.
1S FL — — — — — -
NORTH ELEVATION -B S11/4'=1--0•
DRC # -/g-7/ ?)Date o
e� �i1� ----- M. BATH M. BED RM
Cass Alia-) ic"3ooge'
GARAGE HILLWAY GUEST RM
SECTION B- B SI 1/4•=1'-0•
IN B - B SI 1/4'=1'-0•
M
ME MY
05/10/'17
PREJM. DESIGN REVIEW
8/18/'17
DESIGN REVIEW COMMENM
co S-
z z M
4'
Z
�s
0z
n d �w
v
CA VVN
MC
o Era®
MC
onTE
AS NOTED
a.:ni E
.lam Na
�r
A-4
NOTES: BENCHMARK: '- f
a % 077'2 •,25' RW ENGINEERING. INC.
�,rpy& '-'"/� - ��-'�°,J CML ENGINEERS LAND SURVEYORS
1. THIS ELECTRONIC FILE IS SOLELY
ARCHITECTURAL DRAWINGS TO BTAINRTHE BUILDINGEPER E ARCHITECT FOR THE DEVELOPMENT OF HIS/HER �p391.64 (NAD BB DATUM) APPROVAL _r�C�'� /,�L`t8 � � ��J � (,I
_ RW-. 505 ALTAMONT DRIVE
5035
2. THIS MAP SHALL NOT BE USED TO STAKE OUT CONSTRUCRON IMPROVEMENTS IN THE FIELD. . Application Nurfiber MILPRA(4 CA 262-1
3. THE DELIVERY OF THIS MAP IN AN ELECTRONIC FILE DOES NOT CONSTITUTE THE DELIVERY OF MY C.' p _ (P) (408) 262-1899
PROFESSIONAL WORK PRODUCT. THE SIGNED PAPER PRINT IS PROVIDED TO THE CLIENT AS AN BASIS OF BEARINGS: ��U C- �� ' ��� v � — N (FAX). eeft 824-5556
reengineering®gmeil.com
INSTRUMENT OF SERVICE - IN EVEN' THE ELECTRONIC FILE IS ALTERED, THE SAID PAPER PRINT MUST BE �'-q
REFERRED TO FOR THE ORIGINAL AND CORRECT SURVEY INFORMATION. RW ENGINEERING, INC. SHALL NOT THE BEARING NB9'37'OO'W OF THE CENTERLINE OF ALCALDE ROAD Da7ye
BE RESPONSIBLE FOR ANY MODIFICATIONS MADE, BY OTHERS, TO THE ELECTRONIC FILE, OR ANY AS SHOWN ON -TRACT MAP NO. 1757 FILED IN BOOK 71 OF MAPS BOUNDARY & TOPOGRAPHIC M A P
PRODUCTS DERIVED FROM THE ELECTRONIC FILE. AT PAGE 46, SANTA CLARA COUNTY RECORDS. -
es
4. THIS MAP REPRESENTS TOPOGRAPHY OF THE SURFACE FEATURES ONLY AT THE TIME THE SURVEY WORK}iE�y�
JUNE 27, 2017
WAS COMPLETED. y qV . CONSISTING OF ONE SHEET
lase- ielanaaac er
5. BOUNDARY LINES DELINEATED ON THIS MAP ARE ESTABLISHED BASED ON A FIELD SURVEY FROM FOUND
MONUMENTS AS SHOWN ON TRACT MAP N0: 1757, FILED FOR RECORD IN BOOK 71 OF MAPS AT PAGE SITE, 2256PALO,A
CA
46, SANTA CLARA COUNTY RECORDS. 0 5 10 20 CUP
6. UNLESS SPECIFIED ON THIS MAP, LOCATIONS OF THE UNDERGROUND AND OVERHEAD UTILITIES ARE APN: 342--29-029-063
C
NETHER INTENDED NOR IMPLIED. FOR THE LOCATIONS OF UNDERGROUND UTILITIES CALL *USA' AREA: 19,562. S:F.f
(1-800-642-2440). — SCALE: 1° = 10'
i
7. ALL DISTANCES AND DIMENSIONS ARE IN FEET AND DECIMALS. / .� / \ \ v ualYD'.g
B. BUILDING FOOTPRINTS ARE SHOWN AT GROUND LEVEL
9. FINISH FLOOR ELEVATION TAKEN AT DOOR THRESHOLD (EXTERIOR). 1 _ x v"
•a . I aE ` — ^v b 30° v". .a b °' 171.84' ,w a 1 BB A ND.
1•t
10. A TITLE REPORT FOR THE SUBJECT PROPERTY HAS NOT BEEN EXAMINED BY RW ENGINEERING, INC.. 26° a1. plen '4°-1B
OTHER EASEMENTS OF RECORD MAY EXIST THAT ARE NOT SHOWN ON THIS MAP. 1
1� a1' >" �4r� oa cati�°
X SHE �1. ,. ryb'V" •�h. hq •� 9
LEGEND Ail CONC PAno e
Js
_- PRDPOW LINE ti ` ry1'` /,•1� avbl' ab>`° ab;� ,rbh,eq �'9 ?y
CENTERUNE'`I'
19 a1� �h h y�� ryh. 1
SS UITLIIY LINE -TYPE AS NOTED '� .>19` a 9b • ' ? Al X
yJy ADIACEM y 01 MR? . '� e°'v, vb� v / V vel • ,a11' a° ^P
STREET LIGHT HOUSE
�PG&E UTILITY BOX -TYPE AS NOTED a°" bqo 11 v1b ^b� qb,.a'` qy • 3 �, v I Mae]
SWM/GM WATFR/GAS MEIFRq .v1M1b y 9 b? b'b�❑ a k
3 fib' pb� ,sb' �/ \ vb� POND o 11 •` Ax l
D4 WN WATER VALVE (� M 46) ry� a 0.9 �° - vy� ,b
CURBBASIN '9 •vbR +b�q,. ;N9 ro • '�\ CONIC PAno vya �. d°v'4va.� w q1
' ti � • * :�` pqe ��� 'dry w l' b5 'l°'p1 •y � ,a'lb 'L
O MH M4Nt1(N.E T'PE AS NOTED
1 1b FIRE RMRANT
•P eb. pbq by vb'
OCC) SANITARY SEWER CLEANOUT , b? b�vb •`0 vb ° CONIC PATIO bb 0 v1.+ bb"
a ;@. y e1b' ry v �vb'� q'�.v' PARCEL 1
PPO—OH POWER POLE OVERHEAD WIRE CONC D/W `� ,: y ° °� CHIMNEY ab"" `b� �v - (670 M 23)
BENCHMARK + ^� /
v4b. CONC PATIO I HOUSES
—200— CONIXIR UNE` I
o@MON MONUMENT by
TREE -TRUNK DIAMETER IN INCHES �, X
12° SPECIES NOTED WHEN KNOWN 5
—5 1 b6 "
..GUY WE $ CO
ABBREVIATION ADJACENHOUSE
HOUSE m ;C' CONIC :�ti FF=430.7
AD AREA DRAIN.fib ay. •vh
A.E. ANCHOR EASEMENT GARAGE ro /
BAC
RI BRICK ASPHALT
CONCRETE I ,O�' FF=429.25 o qv / \ G �avb pbmb X11 �yq I-Pp.I
C/G CURB & GUTTER
C CONCRETE �o"�� v. b A ,a • ".
DI DRAIN INLET b 4300H q1 „a� •"
FF FINISH FLOOR GRADE qe
' M1 b a
FL FLOWLINE ,�' ;9� �� ;8' "� C4 v� / �LL d
GM GAS METER 'b.01b 4,p6 1" IRR
LG LIP OF GUTTER > ' ;@ •a �, 1h 5 -_bry / \
MB MAIL BOX CONIC ,0� v.
P.I.I.E. . PUBLIC UTILITY EASEMENT M`
P.S.E. PUBLIC SERVICE EASEMENT - " �b •`@ p@h'" / • 1
SDMH STORM DRAIN MANHOLE •M ,.q� 11b v `try b ab?" b �. \
SSCO SANITARY SEWER CLEANOUT 16° .' e ti
SSMH SANITARY SEWER MANHOLE ;D� I ,P� a • bg? �- CO d` O ' I" 10
S/W SIDEWALK ' by kb?" \ .0 0 o I
TC TOP OF CURB 11" y>� ' h SIDEWALK
TRC TOP OF ROLLED CURB 1b AC D/W v v 'P b°
W.C.E. WIRE CLEARANCE EASEMENT �' ;'�' M1b' :'' ( 10• 1 ,>1' 61M1 AC D/W 11 ti
�'' O 12° h
WM WATER METER pq. .b? MB.. 1b asa oo WMbe _ ��v"= /?�? " p, titi..
�-- OH ° v - QIi bFl - — OH ,9 . �H C� 1 OI "'PA' 01 .
'� AC D/W >b°-�` ..°'yb vee °& ` 1 \ "1 \ _ TEL v >'' CONC C/G
a1. �- EDGE OF PAVEMENT" 6yP° 6yyh vg �"`
,1
SO SD SO SD �— S SD SD D SD SD SD SD SD SD SD SD D SD
Oa� D SD
a
9
�e h��— _ �b� ry11q 1�` •� _ _ e � 1V853708'W — + �
• - 374.45'
` SS SS SS SS SS SS SS SS SS SS SS SS SS . SS. SS SS SS SS. SS SS
ALCALDE ROAD
.. CONC C/G
a? EB
WA'D'ER USAGE LEGEND
All 1511
d
HARDSCAPE L EGEND
ZONE
DESCRIPTION IRRIGATION
AREA
SYMBOL DESCRIPTION
ZONE A:
GRASS AREA HIGH
GR
TBD
EM]CONCRETE PATH WAY WITH BROOM FINISH
ZONE B:
N/A
TBD
H
ZONE C.
PLANTING AREA LOW
TBD
TILE OVERLAY OVER CONCRETE
W
COLORED STAMPED CONCRETE
E-+
TOTAL LANDSCAPE AREA
TBD
(INDICATED IN THE PLAN)
\9
i
PORCH
® INTER LOCKING PAVER
GRASS AREA: TBD
Q
LLQ
_J
FI BLDG AREA
NOTES:
a. The property owner shall record a covenant on the property
for the new trees/shrubs planted for purpose of required replacement
trees, privacy protection, and required front yard tree.
b.Following completion of construction, and affidavit from
an affidavit from an 1SA—certified arborist shall be provided
confirming that the new trees have been planted properly
and according to plan.
c. A planning department inspection is required to verify
exterior materials/finishes, trees, landscaping, site work.
d. A certified landscaping professional shall conduct a landscaping installation
audit after the landscaping and irrigation systems have been installed
per Chapter 14.15 (Landscape Ordinance). The findings of the assessment
shall be consolidated into a landscape installation report provided
to the PlanningDivision.
0
r0
NNGN�
-- -- RSP\ -- -
OVERLAY
AP ROV A\L 9 -,20/C? -,92> Dq
DRC
���,� rr f' 0 Application 6�9umbar
Date
Sgnalhurgj
e. The property owner hall sign a landscape maintenance
agreement per
Chapter 14.15 (Lan cape U?�Mce),
prepared by the Cit and record it with
the Santa Clara Co. ecorder;RPRNice.
The property owner all contft� E the Planning Division
in advance of the fi of
to prepare the ogre ent.
f. A certified lands a e' professional shall provide
a landscape and 'rrigation maintenance schedule
per Chapter 14.1
(Landscape Ordin vice) to the Planning Division.
GENERAL NOT ES:
E C 1. ALL HARDSCAPE AND LANDSCAPE AREAS SHALL
NTING AREA HAVE PROPER SLOPE AND DRAINAGE AWAY FROM
THE HOUSE OR TOWARD APPROPRIATE DRAINAGE
STRUCTURE TO CARRY WATER TO AN APPROVED
DRAINAGE OUTLET
2.CONTRACTOR IS RESPONSIBLE FOR PROPER
DRAINAGE OF ALL AREAS AND SHALL ADHERE
0 TO ALL APPLICABLE LOCAL BUILDING CODES
s— AND INDUSTRY STANDARD FOR ALL WORK
CONTAINED IN THESE PLANS.
S 3. CONTRACTOR IS RESPONSIBLE FOR FOLLOWING
APPROVED, BEST INDUSTRY ACCEPTED
PRACTICES, SPECIFICATIONS AND METHOLDS
FOR INSTALLATION OF ALL ITEMS CONTAINED IN
THESE PLANS.
4. CONTRACTOR SHALL PROVIDE A
WRITTEN WARRANTY FOR ALL WORK CONTAINED
IN THESE PLANS.
EnV2, Inc.
EnivislunefNa e
L1937CONCOURSEDR,
: A, B, C27 9109.51
SE,CA 95131408) 890.628908) 886-7229
z
d
a
/( '- ' I •
\•` -�
O Q
R;
U
w
a r
N �J
a
E-
U
H
P N
w N
W
E-+
LLQ
\9
i
PORCH
z
z
Q
LLQ
_J
�•iooii000000000soo
Li
,I :,
i°opioo°i�
' 'ii°iooi°iosoi°i°ioioi°i°i
\:000000°000°o°o°o°�°0000000°�
Lw
4
/
0
,00000♦
•��00000e0000000000♦
\
1
�
� (foo°000°o°o°000°o°o°o°o°o°00000
1 ♦000000000000000♦
1 r0000000000000000�
�►00000e0000000000e�
LLJ
I�:♦♦10♦°00000♦:::�
,00000000000000000�
IN
o::::o:♦°0000\
•
•
/ ♦o♦♦:o::::::::::/
/ �
y •/'I�°°o°°°o°o°o°°°o°o°o°o°o°o°°°oo�l
�/�000
o
1000°-Gi�XVE
AREA
— �.iv��'o°oo�������°����°°o°�\
14 .LUU—A ��°°
►��,��
\;!0001°o°o°h•_._.
I���°°o
. • • �o°o°°°�°����
\
; / )°o♦
➢ ��%moo°oo°off
M1111-1
�l000---.-.--.-.000000�l
■ ►�°°°°°o°o°°°°000°°°o°°°►00000♦
�000000000000000000.
°o°o°o°o���°o°o°°°o°o°°°o°o°o°o°��
♦000000000��
"� .
C000000000000s00000r
♦00000
I�0000•.o�►00000e0000♦
♦00000:♦♦::�
�
,
�`'��• ►°°°o°o°°°°0000°°o°°°00000°°000°°°°i�il
►°0000°i°ooi°ioioi00000i°i°ioi=opo!!!
_u�.;
� iso°o°o°oho°o°o°o°o°o°o°o°o°o°o°o°o°off
i
. '!,
.
��o�o�owo�i�°o°o°°°oo,
'o�o�o�e�o�o�o�o�oeo�o�e!
MA,
�
s ' /s°ooi°ooi°o°o°i!•!00000!o!•!•
r
r000000000°o°o°0000000000000/
000..00•. I+®_._.r._
.r�••o„
I� �\
•��°000000000°o�
- \i0000000•
®�� �°°°o°o°♦o♦o•°t�
��000000�ii
1
\� ��
1
_®_i
� '• /iliooioi°i°i°ioel
/
/
►000°o°o°000°o��
, �
1.0♦ ♦0000 . = = _--= ._
�_�I__
--_
� --
I �; I IVV'v Vvv I :V7:
Of
yb�o�o�,goo,°bviop000�obio,.,t•�!�!�°!�!�!+!��!\_
iiiei°iei°ieiei°ieo°ieieiei°i°iei°i�,ve.
e°°°°°e°e°°°°°e°°°e°°°e°e°°°e°°°��e'���'■����I�
I' E
_
w•.nra.�e
li■
3 .J���➢■sl
(�i�
�IL I •�-�
� �
' �i� / �`���►°�i°�°oeS°�°i°S°ieS°�
_
`+°�°000�o��el°I°I°I°I°I°I°I°.
� _.'►..�.. � ei 0 0 0 0 0 0 0 0
�_ � � `.��i�i�i�ii�i�i�i�i�i
�►i�i�i�ieo�ioi�i�s�i�r
0
eieiei°i°i°ieieieo°iei°i°ieiei°i�ae.■•���■.���■
� ■.���■3���►►.seieieiei°o°iei°i°i
�
/
e1eo°o°o°leo°1°oeo°oeo°1°oeoeo°1�...
eoeoeoe°e°eoeoeoeoeoeoe000eoeoe.�
eoeoeoeoe°eoeoeoeoeoeoeoeoeoeoeo�
e1°o°o°0°1°0°0°1°0°0°1°1°0°1°1°1�
o ..
,
/
ieieieieieieieieieo
ieieieieieoeieieiei
Re°O°e°e°e°e°e°°°eo
�o�o�oeo�o�o�o�o�o�o�o�o�o�ov000�
e0e0e0eoeoeo 0 0 0 0 0 oeoeoeoe0i
� �� >
�eoeoeoeoeoeoeoeoeo
i o° o s o 0 0 0
'_.
®��,•�
eo°o°o°o°o°o����^��eoeo�
� � ,���'�
% . t, _I®
i�oe � ��`�o�o
t
i�j�j�j�j�j�j�j0jej�j�j�j�jej�j�
eoeoeoeoeoeoeoeoe000eoeoeoyeo�
� ii
�1��1
i e
/ ��
�0���������� ������
gieieoeo�ieoeoeoe!
oeoeoeoeoeveoeoeoeo
.•
i a�
,, ,
c•',•.'� ••
.eoeoe°eoeoeoeoeoeoe°eoeoeoeo�
x'10°1°1°1°1°1°1°1°O°1°1°1°1�
,
• °1010101°1010101010
,�'
�
,1
1
0
r0
NNGN�
-- -- RSP\ -- -
OVERLAY
AP ROV A\L 9 -,20/C? -,92> Dq
DRC
���,� rr f' 0 Application 6�9umbar
Date
Sgnalhurgj
e. The property owner hall sign a landscape maintenance
agreement per
Chapter 14.15 (Lan cape U?�Mce),
prepared by the Cit and record it with
the Santa Clara Co. ecorder;RPRNice.
The property owner all contft� E the Planning Division
in advance of the fi of
to prepare the ogre ent.
f. A certified lands a e' professional shall provide
a landscape and 'rrigation maintenance schedule
per Chapter 14.1
(Landscape Ordin vice) to the Planning Division.
GENERAL NOT ES:
E C 1. ALL HARDSCAPE AND LANDSCAPE AREAS SHALL
NTING AREA HAVE PROPER SLOPE AND DRAINAGE AWAY FROM
THE HOUSE OR TOWARD APPROPRIATE DRAINAGE
STRUCTURE TO CARRY WATER TO AN APPROVED
DRAINAGE OUTLET
2.CONTRACTOR IS RESPONSIBLE FOR PROPER
DRAINAGE OF ALL AREAS AND SHALL ADHERE
0 TO ALL APPLICABLE LOCAL BUILDING CODES
s— AND INDUSTRY STANDARD FOR ALL WORK
CONTAINED IN THESE PLANS.
S 3. CONTRACTOR IS RESPONSIBLE FOR FOLLOWING
APPROVED, BEST INDUSTRY ACCEPTED
PRACTICES, SPECIFICATIONS AND METHOLDS
FOR INSTALLATION OF ALL ITEMS CONTAINED IN
THESE PLANS.
4. CONTRACTOR SHALL PROVIDE A
WRITTEN WARRANTY FOR ALL WORK CONTAINED
IN THESE PLANS.
EnV2, Inc.
EnivislunefNa e
L1937CONCOURSEDR,
: A, B, C27 9109.51
SE,CA 95131408) 890.628908) 886-7229
z
d
a
a
U
O Q
R;
U
w
a r
N �J
a
E-
U
H
P N
w N
W
E-+
LLQ
U
z
z
Q
LLQ
_J
Li
LL—
Lw
0
Q
_j
LLJ
Q
Q
i
C
Sheet: L 1 0
1 of 1 Sheets.
LEGEND
OWNER & SUBDIVIDER:
PROPERTY LINE
CENTERLINE
_SS_
UTILITY UNE -TYPE AS NOTED
�o
STREET LIGHT
[I ELEC
UTILITY BOX -TYPE AS NOTED
SWM
WATER METER
i
WATER VALVE
STORM (ON-SITE):
CURB CATCH BASIN
STORM (OFF SITE):
FIRE HYDRANT
0 MH
MANHOLE -TYPE AS NOTED
0 Co
SANITARY SEWER CLEANOUT
PP`( --OH—
POWER POLE W/ OVERHEAD WIRE
CABLE IV.
BENCHMARK
200—
CONTOUR UNE
@ MON
MONUMENT
If12-t
TREE -TRUNK DIAMETER IN INCHES
12"
SPECIES NOTED WHEN KNOWN
OVERLAND RELEASE
ABBREVIATION
P.S.E.
PUBLIC SERVICE EASEMENT
BENCHMARK:
SCVWD BENCHMARK BM#401
Ei 391.64 (NAVD BB DATUM)
BASIS OF BEARINGS:
THE BEARING NB9'37'00"W OF THE CENTERLINE OF
ALCALDE ROAD AS SHOWN ON TRACT MAP NO.
1757 FILED IN BOOK 71 OF MAPS AT PAGE 46,
SANTA CLARA COUNTY RECORDS.
EX. FUTURE
R/W R/W
20' 10' R/W DEDICAi
4! 5.5' 0
0
AC CONFORM
To CENTERUNE PAVEMENT
OF
OF MEET PAVEMENT 0
= MIN. NEW C/G ile PER Fr.
S W
NEW S/W
i ROADWAYO
WIDENING
TYPICAL HALF ALCALDE ROAD STREET SECTION
NOT TO SCALE
BB.i ................ .
........ .
A
AI
HwW3_1
fiI
YFX'_� 057 A.
m g
0
... . ... .
II
00
C!
7
fi
0
OF 10' GAS
NE EASEMENT
1750 O.R. 213
rport
SHED TY BUILDING
BE REMOVED
'nk
GENERAL NOTES:
OWNER & SUBDIVIDER:
ALLEN & CINDY HSU
10229 SCENIC BOULEVARD
CUPERTINO, CA 95014
APN:
324-29-063
EXISTING ZONING:
SINGLE FAMILY RESIDENTIAL
PROPOSED USE
SINGLE FAMILY RESIDENTIAL
WATER:
SAN JOSE WATER COMPANY
STORM (ON-SITE):
N/A
STORM (OFF SITE):
CITY OF CUPERTINO
SANITARY.,
CUPERTINO SANITARY DISTRICT
GAS & ELECTRIC:
PG&E
TELEPHONE
AT&T
CABLE IV.
COMCAST
SOLID WASTE & RECYCLING
WEST VALLEY COLLECTION & RECYCLING
TOTAL ACREAGE OF
0.45 AC (19,562 SO. FT.)
PROPOSED SUBDIVISION:
NB9*37'00"W 177.84'
................... . ..... ........... ......... . ..
.... ...... ...... . ....
. . . . . ...................
. . . . . . . . .........
NEW RETAINING
WALL
_ . ............. .._.._____ BUILDING SETBACK ..
. : I
........ . . . . ...................
.. . .............
...... .......................
. ...........
7.
33 PO I
.._m
22'-l"
ii
0
.. . . .. .. ......
- _77
.........................
..........
17i-747'77'
jq.7"77-777-7-Y 7-
L PARCEL B
8,892 S.F.
EX. HARDsrAPE
& RETAINING
WALLS TO BE ..................
REMOVED
EX. HOUSE &
GARAGE TO BE
REMOVED
PARCEL A
8,892 S.F.
P o r c
. ................
SHEET INDEX
.......... ........... X.
D r yl 'd' DESCRIPTION SHEET NO.
COVER SHEET TM -1
................. . ......... . . 11;..........................::::.-:..,-�'.'...'.'.'.'.'.'�::::��:.,.,..jl-l- ....... PRELIMINARY GRADING PLAN TM -2 Q
NEW POWER POLE
FUTURE
R D
EAN"G LOCATION. COORD]i
E WALLS TO BE
0 5 10 2D H WITH PG&E
R.O.W. REMOVED B.92'
'37'00'*
..... ... . . ............
SCALE: 1" 10'
El cd3
.a s
............. .................. ......... .. ....... 77=_
. ........................ ;'jil . -rfT ......................... . ---'--4
" v
.............................. . =77777777
TMG� P-A� 00
20' GAS LINE EASEMENT
RELOCATE TEL
sp ....................... .......... ..... ....................... �"n -
............................... .. .... . ... ..... .. .. ... .. ........ . ... ...... ..... ... 5D .............. .. . ...... ! . . ............................
& NEW CURB & MER ROADWAY WIDENING VOULT TO. i
(NI '20�. ROADWAY. DEDICATION 10' STREET AND SIDEWALK
Ac CONFO COORDINATE.V
"F STREET PO COORDINATE
2057 O.R. 244 DEDICATIONCENTERUNE OF
REPOWER
ITH PG&E
62.00' MON-11E LINE 177.81V W
N81 (BASIS OF BEARINGS) 436.45' MON-MON
SIS ss.
—Able—
.. .... .. .. ... ....... . ... . . ....... .. ... ..... .. . .. .. . ...... . ..... .... ......... ISS
..............
APPRMI%L CALDE ROAD
bi
Amok- Jon, uron
. ............ .......
......... ................... . .............
.............................. .. . . ..... ..... . .... ........ ...... .. ...... ... ..................................
. . . .. . ...........
-XI
Date
"ass
VOSS AV
o
PALM AV
_FPi
ALCALDE RD ---- I SITE
SANTA PAULA AV
Amfl RD
o
VICINITY MAP
NOT TO SCALE
PARCEL A I PARCEL B
TOTAL NET AREA
8,892 S.F. :8,892 SZ
IMPERVIOUS SURFACE
4.480 S.F.
I PERVIOUS. PAVING
421 S.F. 1 421 S.F.
PERVIOUS SURFACE
3,991 S.F. 1 4.561 S.F.
P'1-771' 77�1 7':
HOVU9
v
0"M CA,
..... .. . ...... .. . ...... .. ver .. ...... . .... ... ....
196.61' MON-TIE UNi
.. ..... .. .. .. ..
LD
zi
0 .
z
z
z
LU
LU
Z
z
Li
50541
RENEWAL DAM
Ol
0." CALFF
DATE 11/20/17
I_
Lu
LLI
r
U)
01-1
uj
0
0
SCALE: AS NOTED
DESIGNED BY: RW
DRAWN BY: RW
SHEET NO.
TM=1
I OF 2 Si
j+L DOWNSPOUT 18' EARTHWORK TABLE -
NONT
FSDSTACLE
10' MIN?* CONTRACTOR SHALL
REFER TO STRUCTURAL CUT FILL IMPORT
IMPERVIOUS PLAN FOR CONSISTENCY COBBLES GROUND LOCATION (CY) (CY) (CY)
PRIOR TO CONSTRUCTION. OCCURS. 2» PARCEL A 50 3D
I FINISH FLOOR MIN.
- N - PARCEL B 250 50
SPLASH FLOOR JOISTS BASEMENT 0 350
BLOCK 24' SANDY LOAM
z
2.1 B. W/ MINIMUM TOTAL 300 430 130
nm MIN. N
MAX I S=5% MIN.* 20" MIN. OF 5'/ R. NOTE
(VERIFY) ROCKED SWALE ONLY. CONTRACTHWORK ORS IAIES ON THIS TABLE ARE OINFORMATION
S ARE TO PERFORMTHEIRz TAKE -OFF.
EARTH SWALE 0 TM NOT TO SCALE
19> MIN. m
�. TW 428.0 TW 428.1)
TW 427.9 � _ � BW 426.8 BW 426.5
DAYLIGHT
1 TYPICAL GRADING AROUND FOUNDATION 6' m=
w
TM NOT To SCALE ' -_. ....... .' -, -, .,
�,"
" 1
. L1). „r
h
eFL
FL
-777-- s k; ,". . , / r u426.4 -" e% / 424.6
RIM: 427.5 w: RIM 427.5 ROCKED SWALE PE((����`
INV k426.0 FG >"vBW 425.9 FG , % m '6 DETAIL 2/TM1 0 1% FL
A ,�. 4277 E 427:2 :;" A .'�° MIN. (TYP.) 424.5 ^
ryb
wr. 4^x33 LF -6' PVC 33 LF,-6"PVC..., l�aY6J
•
RIM
427 5� hr FL tl�;
.� ........ SO 0 S=0.OD5 ` - SO ®S=0.005 BWy425.8 9 427.0 „ .V,
FG
O 'tie428k DS •veil 426.0 427.2.-,I+ a .° \ ;5"•,, 0
FL A
`_ '<;° •� ".Y '�>' . �:i P Z+.H s e'`� n 427.7 t ROkH PERK
e ys o:
^' ao°' TW 428.0 .' M • i / , b�
BW 42 .0 4a." ,i` DS,, - MIN
^9' B
tis
FS
4zo ayr FS .e .\ �' ..f •• e� 427ID
A 429.0 ,. • ^ 39 LF -6 PVC , ' '� •`• e ,g: p
e - -"' a *°' SD 0 S=0 D05
2% PER pEfAll.
..SWALE PER DETAIL e O, e•9>k 1 ®MIN.
,v' ';, 1/TMt 0 1% MIN. o� (TYP.)R#�.
MAINTAIN EXISTING,''' (TYPry)
6' REDWOOD GRADES ALONG ' taeg, e t'..Et}
FENCE PROPERTY LINE r •e :,a '�` 6' Afl qY. 6'' 1 o} 4 FS "
f ";� xr ^y „1`' PARCEL A RIM 427.4 RIM 426.7 u 427.0. s
-\
428.6 kA. p Ds FF=430.7 INV 425.4 INV 425.2 �a _ DS
PARCEL B GFF=427.0'
FS . FS GFF=4'i9.i` FAD=428.7 DS
1e` azs.D 429.3 p FF=428.7
EARTH >� ..QARPORT TM PAD=426.7 „
SWALE
3`
8 'l S' PAVERS) GARAGE 6" PVC 0 0.5% I 0 IN G RAGE
2 TyAf4AEARTH
2% �� MIN. (TYP.) e e 38 LF -6' PVC 101-V ',^ p
SO 0 S=0.005 e
- 29.0 p FS 38 LF -6' PJC GM N GM 9 k . i
n GFF=429.5' SO 0 S=D.005 Y Y `:. '' GFF=,'426.8' a FL
I I 423.8
EIA 4`
SECTION C C ? 428.0 427.2 e a kaT' a net .�,
FL i .., : P0" Porch ��,
NOT TO SCALE 426.9 0 k �. a DS a� DS _ DS•"�„ NEW D/W �•, ^ "e - Q
DG y(ALK a (PAVERS) 0
NEW D/W
(PAVERS)2gl cah / �e'
BSWenBSW J BSW RIM 427.2
429.50 a 426:81" a 428.25 INV 425.0 '
PROVIDE AC CONFORM
0 NEW SIDEWALKTC
a•
WM
429.31 _ y5; d. s
I
I
Edo FINISH GRADE
SLOPED PER PLAN
0� 0
°rN z M
U
e -
W DRAIN
ROCK
Z
4x6 POSTS 0 g
4' O.C. w
2X REDWOOD PLANK.
18" MAX.. HIGH
FINISH GRADE
.SLOPED PERPLAN
NOT TO'SCALE
SWALE
TAIL
0 1%
fp.)
R
EX. FENCE
I
KEYSTONE WALL OR
SIMILAR. 18' MAX.
HIGH
FINISH GRADE
SLOPED PER PLAN
- NEIGHBORING LOT
SECTION B -B
NOT TOSCALE
42
FG RIM 426.7 •-
. g
428 0 .`'" INV 425.0., ,
e
} ti.
�.. and
OVERLAND
RELEASE '
OVERLAND
'�'^
BSW
cs / .,5`
BSW
425.19 `A26i
BSW
424.63
.' ,,RELEASE
423.94
z,Fy
BS
eL
WM
.,_ •,. -,.- l �:::i(: far P3,Y??'r"#t: �
r ..,:, ,.._. rE-, 3 :1;1 Yl " Lt - Sa "' St .. ................. SO ......... :... y0 G.i \�-•- Fi; -
NEW CURBr,&. GU11ER ........._..., .....
......... : ........................ r: ;. .... ..: .,. 0 G.......".^w.--� as
�` AND SIDEWALK
`-' .� _ 6' ROADWAY WIDENING.��
, NEW POWER POLE LOCATIOA[, AC CONFORM TO
N COORDINATE WITH PG&E CENTERLINE OF REIOC
JOINT TRENCH TO 1 STREET POM -
FOR
4; •" ^ ;r a�'r`3 J.. " ITH
S=0.0332. HOUSE ..� ys.
s4;;=-- `:?• ............. r, 4.. c . .. c: :............................ Sw................................. SS .......................... _...__.. _....... ........................... aS
N WATER SERVICE NEW SEWER LATERAL EX. SEWER LATERAL
,�„,�. n METER TO HOUSE HOUSEAND CLEANOUT TAND O
ol"Ir"fll_/fj��.'"-�. HOUSE REMAINLEANOUTTO
1 U ca (((FVVV�E�B �9®095F&9�P I'
(D sdeiv9 lavage, u 4)
/ :- W W w- w-�--�------ W ,a- w- ;-- 'w- �w,__,�...�... W--
ROAD A,CA,DE ROAD
`\ 423.75
ix "ry
�- RELOCATE %LEPHONE
VOULTTOI•14 SIDEWALK.
COORDINATE�WITH AT&T
50.0324
................ wS SS
�-- NEW WATER SERVICE
& METER TO HOUSE
U�
Z
C7 N
LU
�Z
Z.6
w r23
����
CL' v s 5
=00.
QROFESSip
50541. �
-RENEWAL DAM
06-30-19
�q�, pi V1�•�`!
1)F Cry\F
DATE: 11/2D/17
z
Q
Q a.
z_
2 z
LU 0
C)<
a. CD
........................... SCALE: AS NOTED
DESIGNED BY: RW
0 5 10 Y0 DRAWN BY: -RW
k1wI SHEET NO.
SCALE: 1" = 10' T
2 OF 2 SHEETS