Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
AH Summary 02-08-2018
If l FN >�f�F b58F �4i1 ��4: lJ' To: From: Date: Subj: OFFICE OF COMMUNITY DEVELOPMENT CITYHALL 10300 TORRE AVENUE o CUPERTINO, CA 95014-3255 (408) 777-3308 < FAX (408) 777-3333 o planning�i cupertino.org Mayor and City Council Members Planning Commissioners Benjamin Fu, Assist. Director of Community Development February 20, 2018 REPORT OF ADMINISTRATIVE HEARING DECISION MADE February 8, 2018 Chapter 19.12.1170 of the Cupertino Municipal code provides for Appeal of decisions made at an Administrative Hearing 1. Application ASA -2017-07, Greg Borchardt (Albert Tung), 1451 S De Anza Boulevard Description Architectural and Site approval to allow exterior building and site modifications to an existing Jack in the Box restaurant Action The application was approved at the Administrative Hearing. The approval is effective February 8, 2018. The fourteen -calendar day appeal will expire on .February 22, 2018. Enclosures: Administrative Hearing Report of February 8, 2018 Resolution No(s) 87 Plan set OFFICE OF COMMUNITY DEVELOPMENT PLANNING DIVISION CITY HALL 10300 TORRE AVENUE 0 CUPERTINO, CA 95014-3255 (408) 777-3308 ® FAX (408) 777-3333 ADMINISTRATIVE HEARING STAFF REPORT Agenda Date: February 8, 2018 SUBJECT Architectural and Site Approval to allow exterior building modifications to an existing building (Jack in the Box) and associated site improvements,. (Application No(s).: ASA - 2017 -07; Applicant(s): Greg'Borchardt (PM Design Group, Inc.); Location: 1451 South De Anza Boulevard; APN(s): 366-19-044, 366-19-045) RECOMMENDED ACTION That the Hearing Officer adopt the draft resolution (Attachment 1) to: 1. Find that the proposed actions are exempt from CEQA; and 2. Approve the Architectural and Site Approval Permit DISCUSSION: Application Summary: Architectural and Site Approval to allow exterior building and site modifications to an existing Jack in the Box. Project Data: General Plan Designation: Commercial/Office/Residential Special Area: South De Anza Special Area Zoning Designation: P(CG, Residential 5-15) Let, Size: 22,314 square feet Existing Proposed Restaurant Area: - 2,196 sq are feet 2,196 square feet Seating: 34 seats 36 seats Number of Ernployees: 7 employees 7 employees Vehicular Parking: Required: (1 every 3 seats + 1 per employee) 19 spaces 19 spaces Bicycle Parking: Required: (1 per 2,000 sq. ft.) 3 spaces 4 space ASA -2017-07 Jack In The Box / 1451 South De Anza Boulevard February 8, 2018 Paae 2 Project Consistency with: General Plan: Yes Zoning: Yes Environmental Assessment: Categorically Exempt Background: The project site is located within the South De Anza Special Area on the southwest corner of South De Anza Boulevard and Wildflower Way. The property is regulated by the South Saratoga -Sunnyvale Conceptual Zoning Plan. The South De Anza Special Plan Area is located on the west side of S. De Anza Boulevard between Rainbow Dr. and Prospect Dr., and intended to remain a predominantly general commercial area with active retail and restaurant uses, as well as pedestrian scale elements. The city boundary shared by the cities of Cupertino and San Jose runs in a north -south direction down the centerline of S. De Anza Boulevard between State Route 85 and Prospect Road. To the north of the property is a vacant retail building and a six -unit condominium development; to the west is a nursery (SummerWinds Nursery); to the south is a commercial showroom (Signature Kitchen and Bath Design) and to the east, across South De Anza Boulevard in the City of San Jose, is a retail building (Leslie's Pool Supplies) and other commercial buildings. The site is currently occupied by Jack in the Box, a fast food restaurant with a drive- through service. Since no operational changes are proposed, a Use Permit is not required. Analysis: Applicant Request The applicant, Greg Borchardt (PM Design Group, Inc.) representing the property owner, Albert Tung, is requesting an Architectural and Site Approval for facade modifications to the existing Jack in the Box building. The project scope also includes site and landscape modifications (See Attachment 2.) ASA -2017-07 Jack In The Box / 1451 South De Anza Boulevard February 8, 2018 PaLye 3 Architectural and Site Approval Facade Improvements: The applicant is proposing a new exterior facade to update the existing restaurant's 1960s era building. The new design will have a modular, contemporary feelthat will enhance the experience of patrons and the appearance of the surrounding neighborhood. The existing mansard roof will be replaced with a new parapet wall around the entire building, consistent with newer and remodeled Jack in the Box locations regionally. The overall height will vary -to give the building additional dimension, with an increase in height from 18'-0" to up to 20'-11" from the original design. The brick veneer will remain and be painted with a new color palette, and new aluminum canopies will wrap the building to give the facade a more modern appearance. The parapet walls will have Light -emitting diode (LED) lights that are down -lit and will wash the wall with light. The existing trash enclosure on the site will be modified to include a cover/roof, and new waste receptacles are being provided, close to the public right of way, as required by the Environmental Services Division. Site Improvements: The site has twomain driveways for ingress/egress: one off of S. De Anza Boulevard (east driveway) and another off of Wildflower Way (north driveway.) There is also a one-way "Exit Only" driveway on to S. De Anza Boulevard for drive-through patrons. The applicant proposes to reduce the east driveway from 36 feet to 30 feet and the north driveway from 38 feet to 32 feet to conform to the City's Public Works standards for commercial driveway widths (minimum 24 feet, maximum 32 feet). A condition of approval has been added to ensure that this is completed prior to occupancy. A total of -19 parking spaces, 17 unisize and two, accessible parking spaces, will be restriped in the parking lot. One additional bike parking space will also be provided to conform with the City's requirements. In addition, an accessible path -of -travel to the building is being provided from the public right of way, as required by the California Building Code. The Saratoga Sunnyvale Conceptual Plan requires the provision of a 50 -foot landscape easement (measured from curb line) along South De Anza Boulevard. A five foot sidewalk is required behind a minimum 10-15 feet of the landscape parkway strip. .Additionally, a. 25 -foot landscape area (measured ,from face -of -curb) is required along Wildflower Way. The applicant has proposed site improvements to satisfy these requirements to the extent possible, given the existing building location. A new landscape ASA -2017-07 f ack In The Box / 1451 South De Anza Boulevard February 8, 2018 Paae 4 planter is proposed along the eastern property line and spans approximately 34 feet from back of curb and up to 60 feet in length, with a new five foot sidewalk, behind an approximately nine and a half foot wide landscape parkway strip. Streetdedication for the new sidewalk will be required and has been included as a condition of approval. The existing landscape planter on the north side has been widened an additional four feet, for a total width of approximately 16 and a half feet. These new and modified planters will feature new low-water use plants and trees. The applicant has proposed Crape Myrtle trees as part of the landscaping. The City's General Plan requires the planting of shade trees in the parking lot. While there are visibility concerns with the planting of larger shade trees at the corner of Wildflower Way and S De Anza Blvd, and along S. De Anza Boulevard, it is possible to provide larger shade trees to replace the proposed crape myrtles in the northern planting area. This will not only provide shade within the parking lot but will also shield the residential development across the street from light, glare and other similar issues. In addition, it is also possible to provide a planter in the right of way closer to the intersection of Wildflower Way and S. De Anza Boulevard., on Wildflower Way. A condition of approval has been added to require both of these. Driveway Consolidation: The City's General Plan has several policies that emphasize improving the,walk-ability a.nd bike -ability within the City. Policy M-3.5: Curb Cuts states "Minimize the number and the width of driveway openings." The General Plan also includes strategies to encourage shared driveway, access within blocks where feasible. Additionally, the Saratoga - Sunnyvale ,Conceptual Zoning Plan also requires the consolidation of driveways where possible upon redevelopment, including fagade remodels. In the interests of ensuring that the restaurant can operate efficiently, the City is not requiring consolidation of the north driveway with a driveway located immediately to its west (serving the Summerwinds Nursery to the west and properties to the south) at this time. In lieu of this, a condition of approval has been added to require recordation of a covenant which memorializes the property owner's agreement to consolidate the driveways, at a later date, if determined feasible by the City, when the City is able to require the same of the adjacent property, and enter into appropriate ingress/egress easements. Lot Merger: The site consists of two legal parcels - one that encompasses the majority of the lot (the building, parking area, and drive-through entry) (APN 366-19-044); and the second parcel that encompasses the drive-through, described in the property's title report as a ""non- exclusive easement for ingress and egress, and for driveway purposes, appurtenant ASA -2017-07 Jack In The Box / 1451 South De Anza Boulevard February 8, 2018 Paze 5 to ... Parcel One" (APN 366-19-045). Because there is no need for the easement to have a separate parcel and policies in the City's General Plan which encourage lot mergers when property is owned and controlled by the same entity, a condition of approval has been incorporated into the draft resolution requiring the merger of the parcels into one single parcel prior to building permit issuance. Signs: Signage is not approved with this application. Signage shall conform to the City's Sign Ordinance (Chapter 19.104.) Other Department/Agency Review The City's Public Works Department, Building Division, Environmental Services Department, Santa Clara County Fire Department, and the Cupertino Sanitary District have reviewed the project and have no objections to the proposed plans. Their pre - hearing comments have been incorporated as conditions of approval in the draft resolutions. Environmental Review This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA, Section 15301 Existing Facilities). PUBLIC NOTICING AND COMMUNITY OUTREACH The following table is a brief summary of the noticing for this project: ZPIS � ,�i�`,.��' 3�� EtS:��ie� PAN Staff has received no public comments on the project as of the date of production of this staff report (as of January 30, 2018). PERMIT STREAMLINING ACT This project is subject to the Permit Streamlining Act (Government Code Section 65920 — 65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received: July 31, 2017; Deemed Incomplete: August 7, 2017 Project Revisions Received: August 21, ml 7; Deemed Complete: September 14, 2017 �a�.��.���. +h.s...�^ ® Site Signage (at least 10 days prior to a Posted on the City's official notice` hearing) bulletin board ( five days prior to ® 15 notices mailed to property owners hearing) adjacentto the project site (at least 10 ® Posted on the City of Cupertino's days prior to the hearing) Web site ve days prior to hearing) Staff has received no public comments on the project as of the date of production of this staff report (as of January 30, 2018). PERMIT STREAMLINING ACT This project is subject to the Permit Streamlining Act (Government Code Section 65920 — 65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received: July 31, 2017; Deemed Incomplete: August 7, 2017 Project Revisions Received: August 21, ml 7; Deemed Complete: September 14, 2017 ASA -2017-07 Jack In The Box / 1451 South De Anza Boulevard February 8, 2018 PaL-e 6 Since this project is Categorically Exempt, the City typically has 60 days (until November 14, 2017).to make a decision on the project. However, the applicant has waived the Permit Streamlining Act requirements per an email dated January 10, 2018 to allow sufficient time for plan modifications. The Administrative Hearing Officer's decision on this project is final unless appealed within 14 calendar days of the decision. CONCLUSION The proposed facade modifications and the proposed site modifications with the conditions of approval discussed above can be supported. Therefore, approval of the Architectural and Site Approval is recommended, since the plans and proposed conditions of approval address all concerns related to the proposed project. Additionally, all of the findings for approval of the proposed project, consistent with Chapters 19.168 of the Cupertino Municipal Code, may be made as reflected in the Draft Resolution. NEXT STEPS The permit will be effective 14 calendar days from the date of the hearing. The decision of the Administrative Hearing Officer is final, unless appealed within 14 calendar days from the date of the hearing. The applicant may apply for building and/or other permits with the City at the end of the appeal period. This,approval is valid until February 8, 2020. The applicant may apply for a one-time one year` extension before the approval expires.. Prepared by: Jeffrey Tsumura, Assistant Planner Approved by: Piu Ghosh, Principal Planner ATTACHMENTS 1. .'Draft Resolution 2. Plan Set CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO-. 87 OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO TO ALLOW EXTERIOR'BUILDING MODIFICATIONS TO AN EXISTING BUILDING (JACK IN THE BOX) AND ASSOCIATED SITE IMPROVEMENTS AT 1451 SOUTH DE ANZA BOULEVARD SECTION I: PROTECT DESCRIPTION Application No.: ASA -2017-07 Applicant: Greg Borchardt (PM Design Group, Inc.) Location: 1451 South De Anza Boulevard (APNs #366-19-044, 366-19-045) SECTION IT: FINDINGS WHEREAS,- the Administrative Hearing Officer of the City of Cupertino received an application to allow an Architectural and Site Approval to allow exterior building and site modifications to an existing Jack in`the Box; WHEREAS,, the project is categorically exempt from the California Environmental `Quality Act (CEQA); and WHEREAS, the necessary public meeting notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least one public meeting in regard to the application; and WHEREAS, the Administrative Hearing Officer finds that: 1. The proposal will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The project is not detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience because the applicant is proposing a modification to the building fagade without an increase in floor area and site improvements to enhance landscaping and ADA accessibility. The applicant is also reducing the size of the driveway curb cuts either as proposed or as a condition of approval. This will improve the 'walkability and bikeability of the vicinity and also reduce Resolution No. 87 ASA -2017-07 February 8, 2018 Page 2 the speed of cars entering or exiting the site, therefore, improving the general safety in the area. 2. The proposal is consistent with the purposes of Chapter 19.168, Architectural and Site Review, of the Cupertino Municipal Code, the General Plan, any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings; The proposed fagade modifications will result in a gradual transition in height between 1'-4" to 2'-11 " from the existing building height. The project does not increase the number of stories for the structure. The building is surrounded by single story structures on the west, south and east and has a taller single story commercial building and three story condominiums to the north. Therefore, the additional height due to the proposed faeade modification is not abrupt and will be harmonious. The floor area of the building will remain unchanged. b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new buildings should harmonize with adjacent development by being consistent or compatible with design and color schemes, and, with the future character of the neighborhood and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments, and provide shielding to prevent spill-over light to adjoining property owners; The fagade modifications are harmonious with the existing buildings in the commercial shopping center and will not impact adjoining properties. The properties to the north have a more modern design ethic while the buildings to the south are much older. However, the proposed design maintains the brick veneer and adds modern elements to the roof/parapet. All rooftop equipment will be screened from view and a new enclosure and roof will be added to the existing trash area. New lighting sources are shielded or down -lit and any Resolution No. 87 ASA -2017-07 February 8, 2018 Page 3 adjacent residential properties will not be impacted. As a condition of approval, the applicant will be required to plant larger shade trees along the northern side of the property which will further alleviate any light pollution. New low-water use landscaping will be installed in the existing planter areas to provide visual relief of the parking area and enhance the overall site design. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures shall minimize traffic hazards and shall positively affect the general appearance of the neighborhood and harmonize with adjacent development; and Signage is not approved as part of this application and therefore, not reviewed in conjunction with this application. The property owner will submit a Master Sign Program at a later date and site signage will be reviewed at that time. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects -by use of buffering, setbacks, landscaping, walls and other appropriate design measures. The project is an existing business and no changes to the building setbacks, hours, or operations are proposed. The project site is located in a Planned Development General, Commercial/Residential zone, and is adjacent to a six -unit condominium development. However, the proposal includes new landscaping for enhanced screening from streets and neighboring properties. As a condition of approval, the applicant is required to plant larger shade trees along the northern side of the property to further protect residents from the light and other visually intrusive effects of the development. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, the Hearing Officer finds that the proposed project is exempt from CEQA, and Application No. ASA -2017-07, is hereby approved; and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the public meeting record concerning Application ASA -2017-07 as set forth in the Minutes of the Administrative Hearing Meeting of February 8, 2018, and are incorporated by reference herein. Resolution No. 87 ASA -2017-07 February 8, 2018 Page 4 SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1.' APPROVED EXHIBITS Approval is based on the plan set dated September 22, 2016, with Delta 4 revisions dated August 16, 2017, by PM Design Group, Inc. consisting of eight (8) sheets titled, "Exterior Refresh Upgrade & Interior Remodel, 1451 South De Anza Blvd., Cupertino, CA 95014" except as may be amended by conditions in this resolution. 2. ACCURACY OF PROTECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building; setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth in this resolution shall be incorporated with complete written annotated responses into the building permit submittal. 4. INGRESS/EGRESS EASEMENT Prior to issuance of a Building Permit for the site, the property owner shall record a deed restriction agreeing to the consolidation of the driveway on 'Wildflower Way and enter into a Reciprocal Access Easement with the adjoining property owner(s), at such time in the future that the City can require the same of the adjoining property owner(s). The precise location of the consolidated driveway and/or easement(s) shall be determined by the City at the time that the adjoining property(ies) develop(s). Said agreement shall provide that the access be implemented (the expenses for which shall be borne by both parties) at such time as the City can require participation in shared access of the other property owner through a Planning -permit. 5. SITE DESIGN MODIFICATION The applicant shall ensure that the design of the proposed parking lot prior to issuance of encroachment and/or building permits . satisfies the following requirements, subject to review and approval by the Directors of Community Development and Public Works: a. The driveway widths on South De Anza Boulevard and Wildflower Way conform to the City Standard Details and are consistent with the Public Works standards of no more than 32 feet in width. Resolution No. 87 ASA -2017-07 February 8, 2018 Page 5 b. Provide one additional landscape planter in the right of way along Wildflower Way, where determined to be feasible by the City to separate the sidewalk. c. Expand the existing landscape areas to the greatest extent possible in conformance with the standards in the Saratoga -Sunnyvale Conceptual Zoning Plan. The final design shall be reviewed and approved to the satisfaction of the Community Development Director. 6. LOT MERGER Prior to issuance of a Building Permit for the site, a Lot Line Adjustment application shall be filed through the Public Works Department to merge the two parcels on the property into one single parcel. 7. LANDSCAPE PLAN The final landscaping plan shall be reviewed and approved by the Planning Division prior to issuance of building permits. If the landscape area (defined by section 14.15.030) exceeds 2,500 square feet, then a full landscape project submittal per section 14.15.040 is required prior to issuance of building permits. The final landscape plan shall be updated to replace the proposed Crape Myrtle (Lagerstroemia 'Cherokee') with trees that provide a larger shade canopy including Crape Myrtle (Lagerstroemia'Muskogee'). 8. SIGNAGE Signage is not approved with this use permit application. Signage shall conform to the City Sign Code. 9. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 10. EXTERIOR BUILDING MATERIALS/TREATMENTS Final building exterior treatment plan (including but not limited to details on exterior color, material, architectural treatments and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The final building exterior plan shall closely resemble the details shown on the original approvedplans. Any exterior changes determined to be substantial by the Director of Community Development shall require a minor modification approval with neighborhood input. Resolution No. 87 ASA -2017-07 February 8, 2018 Page 6 11. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the "indemnified parties") from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more ' of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys' fees and costs within 30 days following receipt of invoices from City. Such attorneys' fees, and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 12. NOTICE OF FEES DEDICATIONS RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within, this 90 -day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT 13. TRASH, RECYCLING AND COMPOST RECEPTACLES The developer is required to install public bins (-30 gal) side-by-side for trash, recycling and composting, adjacent to the development to control pedestrian litter at the site. The type and location of the receptacles are subject to the approval of the Environmental Programs Manager. (CMC 9.18.210 P) 14. TRASH; RECYCLING AND COMPOST ENCLOSURES The existing trash enclosure must be sized in accordance the City's "Public Works Guidelines for Non -Residential Building Trash & Recycling Enclosures" posted at www.cupertino.org/nowaste. Modifications to existing facilities shall, to the maximum extent practicable, meet the Public Works Guidelines and shall be subject Resolution No. 87 ASA72017-07 February 8, 2018 Page 7 to the approval of the Public Works Director. Clearance by the Public Works Department is required prior to obtaining a building permit. (CMC 9.18.210 H & K) 15. TRASH FULL CAPTURE STORM DRAIN CATCH BASIN INSERTS For projects located in medium and high trash management areas as defined by the City of Cupertino Trash Management. Area Map or are adjacent to a creek, trash full capture storm catch basin inserts may be requi °red. 16. STORM DRAIN INLET MARKERS All exterior storm drain inlets on the property shall be clearly marked with "No Dumping Flows to Creek" or "No Dumping Flows to Bay". 17. STREET IMPROVEMENTS The applicant shall provide a street improvement plan along the project frontages to the satisfaction of the Director of Public Works. Curbs, gutters, sidewalks, driveway approaches, and related structures shall be installed in accordance with grades and standards as specified by the City Engineer. 18. DRAINAGE Drainage shall be provided to the satisfaction of the City Engineer. Pre- and post development calculations must be provided to indicate whether additional storm water control measures are to be installed. Onsite drainage shall be shown on the site plan with direction and slope percentage. 19. IMPROVEMENT AGREEMENT The project developer shall enter into a developer agreement with the City of Cupertino providing for payment of fees including, but not limited to, checking and inspection fees, storm drain fees, park dedication fees, and fees for the undergrounding of utilities. Said agreement shall be executed prior to issuance of construction permits. Fees: a. Checking and Inspection Fees: b. Storm Drainage Fee: C. Power Cost: Per current fee schedule ($3,349.00 or 5% of improvement costs) Per current fee schedule ($8,790 per AC) Based on latest effective PG&E rate schedule a -p -proved by the PUC Bonds: Faithful Performance Bond: 100% of off-site and on-site improvements Labor and Material Bond: 100% of off-site and on-site improvements On-site Grading Bond: 100% of site improvements Resolution No. 87 ASA -2017-07 February 8, 2018 Page 8 The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit. In the event of said change or charges, the fees changed at that time will reflect the then current fee schedule. 20. OPERATIONS & MAINTENANCE AGREEMENT The applicant shall enter into an Operations & Maintenance Agreement with the City prior to final occupancy. The agreement shall include the operation and maintenance for non-standard appurtenances in the public road right-of-way that may include, but is not limited to, sidewalks, pavers, and street lights. 21. WATER BACKFLOW PREVENTERS Domestic and Fire Water Backflow preventers and similar above ground equipment shall be placed away from the public right-of-way and site driveways to a location approved by the Cupertino Planning Department, Santa Clara County Fire Department and the water company. 22. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMPs), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in grading and street improvement plans. 23. TRAFFIC CONTROL PLAN The applicant must submit a traffic control plan by a Registered Traffic Engineer to be approved by the City. The Plan shall include a temporary traffic control plan for work in the right-of-way as well as a routing plan for all vehicles used during construction. All traffic control signs must be reviewed and approved by the City prior to commencement of work. The City has adopted Manual on Uniform ,Traffic Control Devices (MUTCD) standards for all signage and striping work throughout the City. 24. STREET TREES Street trees shall be planted within the public right-of-way to the satisfaction of the Director of Public Works and shall be of a type approved by the City in accordance with Ordinance No. 125. 25. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City. Resolution No. 87 ASA -2017-07 February 8, 2018 Page 9 26. DEDICATION OF NEW SIDEWALK The dedication in fee title will be required to incorporate the new sidewalk and associated improvements. Prior to building permit issuance, the applicant shall provide a plat and legal description prepared by a Licensed Land Surveyor or qualified Civil Engineer. The City will provide the dedication language to be signed by the property owner and recorded with the County. 27. DEDICATION OF UNDERGROUND WATER RIGHTS The applicant shall "quit claim" to the City all rights to pump, take, or otherwise extract water from the underground basin or any underground strata in the Santa Clara Valley. PASSED AND ADOPTED this 8th day of February, 2018 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: /s/Teffrey Tsumura Jeffrey Tsumura Assistant Planner APPROVED: /s/Benjamin Fu Benjamin Fu Asst. Director of Community Development STORE #0490 MARK 5F 48 EXTERIOR REFRESH UPGRADE & INTERIOR REMODEL 1451 SOUTH DE ANZA BLVD. CUPERTINO, CA 95014 GENERAL NOTES 1. IN THE EVENT OF DISCREPANCIES BETWEEN THE DRAWINGS OR SPECIFICATIONS, IN THIS PACKAGE, NOTIFY ARCHITECT IMMEDIATELY. 2. ARCHITECT SHALL NOT BE RESPONSIBLE OR HAVE CONTROL OR CHARGE OVER ACTS OR OMISSIONS, CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES, OR FOR THE SAFETY PRECAUTIONS & PROGRAMS OF THE CONTRACTOR, SUBCONTRACTOR, OR ANY OTHER PERSONS PERFORMING WORK ON THE PROJECT. 3. ARCHITECT HAS NOT BEEN RETAINED FOR REVIEW, SUPERVISION OR ADMINISTRATION OF THE CONTRACT, NOR CERTIFICATION OF PAYMENTS, CONSTRUCTION COORDINATOR SHALL BE OWNER'S REPRESENTATIVE DURING CONSTRUCTION & UNTIL FINAL PAYMENT IS MADE. THE OWNER'S REPRESENTATIVE WILL REVIEW THE PROJECT & RENDER NECESSARY DECISIONS FOR THE PROGRESS OF THE WORK. 4. CONTRACTOR IS RESPONSIBLE TO SEE THAT WORK IN THE FIELD IS DONE IN ACCORDANCE WITH ALL CURRENT APPLICABLE NATIONAL, STATE, AND LOCAL CODES, ORDINANCES, AND REQUIREMENTS BY THE GOVERNING AGENCIES, WHETHER OR NOT SAID CODES, ORDINANCES, REQUIREMENTS, ETC ARE SPECIFICALLY SHOWN ON THE DRAWINGS AND/OR CALLED FOR IN THE SPECIFICATIDNS. 5. CONTRACTOR SHALL PROTECT ALL EXISTING ITEMS AND FACILITIES TO REMAIN THROUGHOUT CONSTRUCTION, CONTRACTOR SHALL REPAIR AND/OR REPLACE, AT CONTRACTOR'S EXPENSE, ANY EXISTING ITEMS AND FACILITIES TO REMAIN THAT ARE DAMAGED BY CONTRACTOR'S OPERATIONS TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE 6. GENERAL CONTRACTOR SHALL COORDINATE THE DEUVERY OF ALL OWNER SUPPLIED EQUIPMENT. THE CONTRACTOR IS RESPONSIBLE FOR INSPECTION OF EQUIPMENT AT THE TIME OF DELIVERY AND SHALL NOTIFY EQUIPMENT SUPPLIER OR ANY DEFICIENCIES OR DAMAGED EQUIPMENT AND ARRANGE FOR REPLACEMENT. 7. PRIOR TO EXCAVATION, DETERMINE AND VERIFY LOCATION OF UTILITY SERVICES IN ALL AREAS TO BE EXCAVATED. B. CONTRACTOR SHALL COMPLY WITH ALL PERTINENT LAWS, CODES, REGULATIONS, GOVERNING AGENCIES AND MANUFACTURE SPECIFICATION, UNLESS GREATER REQUIREMENTS ARE INDICATED, OR ARE NECESSARY FOR SAFE WORKING CONDITIONS. 9. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING JURISDICTIONS AS REQUIRED FOR INSPECTIONS AND SHALL PAY INSPECTION FEES ASSOCIATED WITH THE WORK. 10. ARCHITECT SHALL APPLY FOR ELECTRICAL HVAC MECHANICAL, AND PLUMBING PERMITS. 11. ARCHITECT, SHALL APPLY FOR ALL PERMITS WHICH INVOLVE DRAWING SUBMITTAL AND PROCESSING, BUILDING, FIRE, AND ENVIRONMENTAL HEALTH. 12. THE GENERAL CONTRACTOR SHALL PROVIDE THE OWNER'S ENGINEER WITH A CONSTRUCTION SCHEDULE PRIOR TO STARTING THE WORK, SHALL PROVIDE A QUALIFIED JOB SUPERINTENDENT THROUGHOUT THE WORK, AND PROVIDE THE OWNER WITH PHOTOS SHOWING PIPING AND ELECTRICAL TRENCHES PRIOR TO BACK FILL, AND SHALL PROVIDE A SET OF "AS BUILT" MARKUPS AT COMPLETION. 13. THE GENERAL CONTRACTOR SHALL PROVIDE BARRICADES AND SAFETY SIGN PER OSHA REQUIREMENTS. 14. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR OVERALL CONSTRUCTION SITE CLEANLINESS, INCLUDING PROVISIONS OF A DEBRIS BOX WITH REGULAR SERVICING, REMOVAL OF ALL CONTRACTOR REFUSE AND DEBRIS, AND SWEEPING OF THE ENTIRE YARD AREA AT COMPLETION OF THE WORK. 15. ALL PROCEDURES, TESTING, MATERIALS, LABOR, AND EQUIPMENT SHOWN ON THE PLANS SHALL BE FURNISHED AND INSTALLED BY GENERAL CONTRACTOR, UNLESS NOTED OTHERWISE IN THESE PLANS, EQUIPMENT OR MATERIALS NOTED ONLY AS 'FURNISHED BY OWNER' SHALL BE INSTALLED BY THE GENERAL CONTRACTOR. 16. CONTRACTORS SHALL NOT SCALE THESE DRAWINGS FOR CONSTRUCTION PURPOSES, IN THE EVENT OF OMISSION OF NECESSARY DIMENSIONS THE CONTRACTORS SHALL NOTIFY THE ARCHITECT. 17. ERRORS AND/OR OMISSIONS IN THE SCHEDULES DOES NOT RELIEVE THE CONTRACTOR FROM EXECUTING THE WORK SHOWN ON THE DRAWINGS OR DESCRIBED IN THE SPECIFICATIONS. 1B. NO HAZARDOUS MATERIALS WILL BE STORED AND/OR USED WITHIN THE BUILDING WHICH WALL EXCEED THE QUANTITIES LISTED IN THE CBC TABLE 307.1 (1) AND 307.1(2). I VICINITY MAP I PROJECT DESCRIPTION JACK IN THE BOX IS PROPOSING TO REMODEL AN EXISTING 2,196 S.F. BUILDING WITH AN EXISTING DRIVE THRU. PROJECT IS MAINTAINING EXISTING OCCUPANCY AND CURRENT USE THE PROJECT CONSISTS OF NEW EXTERIDR PAINT UPGRADE OF THE EXISTING 'JACK IN THE BOX'. NEW EXTERIOR WALL LIGHTING WILL BE ADDED TO NEW PARAPET. STRUCTURAL RETROFIT AND NEW ROOF. THE PROJECT ALSO CONSISTS OF IN INTERIOR REMODEL ADA COMPLIANT RESTROOMS, NEW DINING ROOM SEATING AND FINISHES, NEW FINISHES IN RESTROOMS, NEW LID LIGHTING THROUGHOUT BUILDING. HOURS OF OPERATION ARE 6:30AM-2:OOAM FOR THE DINING ROOM, AND 24 HR OPERATION. FOR THE DRIVE-THRU, TOTAL NUMBER OF EMPLOYEES 145 TOTAL NUMBER OF EMPLOYEES ON LARGEST SHIFT.• B UNDER SEPARATE PERMIT LEGEND & ABBREVIATIONS CONSULTANT INFORMATION ALSO REFER TO LEGEND & ABBREVIATIONS ON CIVIL, SITE, PLUMBING, MECHANICAL, ELECTRICAL & KITCHEN DRAWINGS BUILDING OWNER: PM DESIGN GROUP, INC. & AND MAT. MATERIAL 1451 SOUTH DE ANZA BLVD. ROCKLIN, CA 95677 O AT MAX MAXIMUM philip.hsla0grnall.corn dlundy®prndglnc.com AB. ANCHOR BOLT M.B. MACHINE BDLT CULLUMBER ENGINEERING INDICATES SHEARWALL LOCATIONS WHERE A.C. ASPHALTIC CONCRETE MECH. MECHANICAL ROCKLIN, CA 95677 NO CONDUIT OR PIPING WILL BE PERMITTED AGL ACP AMERICAN CONCRETE INSTITUTE ACOUSTIC COUNG PANEL MEZL MFR. MEZZANINE MANUFACTURER TO PENETRATE SILL DR TOP PLATE SEE AD.AA.G. AMERICANS € ITH DISABILITIES ACT MIN. MINIMUM PLANS FOR ADDITIONAL NOTES. ACCESSIBILITY GUIDELINES MISC. MISCELLANEOUS AFF, or AFF ABOVE FINISH FLOOR MPH MILES PER HOUR ALUMINUM M.P.S. MODULAR PANELBOARD ®ALUM. BATT INSULATION A.P.A AMERICAN PLYWOOD ASSOCIATION SYSTEM A.O.T. ABRASIVE QUARRY TILE M.SB. MAIN SWITCH BOARD ® RIGID INSULATION ARCH. A.S.T.M. ARCH SOLI AMERICAN SOCIETY FOR TESTING MIL METAL MATERIALS NO, NEW a 0 NUMBER GYPSUM BOARD BILK a BICC BLOCKING B.N. BOUNDARY NAIL N.I.C. N.T.S. NDT IN CONTRACT NOT S SCALE A.O. BOTTOM OF CERAMIC AND QUARRY TILE BM. B.O.J. BEAM BOTTOM OF JOIST O.C. O.F.C.L ON CENTER OWNER FURNISHED, B.U.R. BUILT UP RDOFING CONTRACTOR INSTALLID BOTT. or (B) BOTTOM O.F.O.L OWNER FURNISHED, F//-/77 PLYWOOD C CONDUIT O.H. OWNER INSTALLED OPPOSITE HAND C.L. or k CENTER LINE OPNG OPENING C.B.B CEMENTITIOUS BACKER BOARD D CONCRETE GD. CORE DRILL P.C. PLUMBING CONTRACTOR C.J. CONTROL JOINT (COLD JOINT) PERP. PERPENDICULAR ® MASONRY CID. CLR• C.M.U. COLING CLEAR CONCRETE MASONRY UNIT P. LAM PL PLASTIC LAMINATE OR PARAUAM (BEAM) PLATE COL COLUMN P.L. PROPERTY LINE CONCRETE PLYING. PLYWOOD ®GONG ASPHALTIC CONCRETE PAVING CONN. CONNECTION PDS or P.O.S. PONT OF SALE CONST CONSTRUCTION PR PAIR CONST. JT CONT. CONSTRUCTION JOINT CONTINUOUS PSF. PB. POUNDS PER SO. FOOT POUNDS PER EARTH GRADE CONTR. CONTRACTOR P.T. SO. INCH PRESSURE TREATED OOMP COMPACTED (ION) C.T. CERAMIC TILE Q.T. QUARRY TILE SAND BASE QTY. a QTY QUANTITY DBL DOUBLE DEG. a ' DEGREE RAO.DR (R) RADIUS KITCHEN ROOM NAME DIA a f DIAMETER RDNF. REINFORCEMENT 110 ROOM NUMBER DUAL • DIMENSION R.O. ROUGH ORIENTATION DR. DOOR S.C. SAW -CUT JOINT DWG.(S) DRAWING(S) SCHED. SCHEDULE 128 FINISHES & EQUIPMENT SEE ID DRAWINGS SHT• SHEET (EA NG SIM. SIMILAR EC. EACH ELECTRICAL CONTRACTOR SM SMS SHEET METAL SHEET METAL SCREW 700 EF. EACH FACE SPEC.(S) SPECIFICATION(S) EQUIPMENT, SEE KITCHEN DRAWING EL or ELEV. ELEVATION SQ. SQUARE EN. EDGE NAIL SQ. IN. SQUARE INCH EO.C. EDGE OF COUNTER / EDGE OF SQ. FT. SQUARE FOOT 00 EXTERIOR MATERIAL / FINISH EQUIPMENT S.S. STAINLESS STEEL AA EXTERIOR COLOR ELEC. ELECTRICAL STANDARD EQ. a EQUIP. EQUAL EQUIPMENT SILL STI. TEEL STRUCTURAL 1 E.S. EACH SIDE SUSP. SUSPENDED EXP. EXPANSION S.W. SHEARWALL 4 A7.0 2 INTERIOR ELEVATION IXT. EXTERIOR SYN. SYMMETRICAL FACT. FACTORY (1) TOP 3 F.D. FLOOR DRAIN TEMP. TEMPERED (TEMPERATURE) FON. FOUNDATION T.G. TEMPERED GLASS F.F. FINISHED FLOOR SX SICKNESS 101 DOOR SYMBOL F.F.L.FINISHED FLOOR LEVEL T & G TONGUE & GROOVE F.G. FLOAT GLASS T.N. TOE NAIL FIR. FLOOR T.O. TOP OF O KEY NOTES FIN. F.N. FINISH FIELD NAIL T.O.B. T.O.C. TOP OF BEAM TOP OF CURB F.O.B. FACE OF BEAM T.O.F. TOP OF FOOTING F.O.F. FACE OF FINISH T.O.PL TOP OF PLATE F.O.J. FACE OF JOIST T.O.S. TOP OF SLAB OA SHEARWALLANCHOR BOLT SYMBOL / F.O.M. F.D.P. FACE OF MASONRY FACE OF POST T.O.W. TYR TOP OF WALL TYPICAL F.O.S. FACE OF STUD F.R.P. FIBERGLASS REINFORCED PANEL U.B.C. UNIFORM BUILDING CODE F.S FLOOR SINK U.O.N. UNLESS OTHERWISE NOTED ❑1 FOOTING SYMBOL FT. FTG FOOT a FEET FOOTING U.S.P. UNDER SEPARATE PERMIT VERT. OR (Y) VERTICAL p DETAIL NUMBER GA or GA GB. or GIP. sm GAUGE (GAGE) GYPSUM BOARD V.W.C. VINYL WALLCOVERING A7.0 SHEET NUMBER GC. GALV. GENERAL CONTRACTOR GALVANIZED W/ WD. WITH WOOD G.L. GALVANIZED IRON W.G.B. WATER RESISTANT GYPSUM (XB. GLUE—LAMINATED BEAM W.I.B. BOARD WALK—IN or WALK IN BOX 1 WALL SECTION NUMBER / ELEV. NUMBER H.D. HUB DRAIN WT WEIGHT 55.0 SHEET NUMBER HDR. HOW. HEADER HARDWARE WWM. WELDED WIRE MESH HGP HOT. or HT HANGER HDGHT 1 BUILDING SECTION NUMBER H.N. HOLLOW METAL A6.0 SHEET NUMBER HORIZ or H HORIZONTAL H.S.B. HIGH STRENGTH BOLT I.B.C. INTERNATIONAL BUILDING CODE Q1 REVISION SYMBOL I.D. IN. INTERIOR DESIGN INCH INFO. INFORMATION ELEVATION/DATUM MARK INT. NTERIDR INVERTED NV. JT. a JNT JOINT *--+I`- DIMENSION TO EDGE / FACE OF OBJECT JIB or J.I.B. Jack in the Box Inc JST. JOIST LANGLE �—� DIMENSION TO CENTER UNE OF OBJECT E a ! LB or / POUNDS LG LONG GENERAL NOTES 1. IN THE EVENT OF DISCREPANCIES BETWEEN THE DRAWINGS OR SPECIFICATIONS, IN THIS PACKAGE, NOTIFY ARCHITECT IMMEDIATELY. 2. ARCHITECT SHALL NOT BE RESPONSIBLE OR HAVE CONTROL OR CHARGE OVER ACTS OR OMISSIONS, CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES, OR FOR THE SAFETY PRECAUTIONS & PROGRAMS OF THE CONTRACTOR, SUBCONTRACTOR, OR ANY OTHER PERSONS PERFORMING WORK ON THE PROJECT. 3. ARCHITECT HAS NOT BEEN RETAINED FOR REVIEW, SUPERVISION OR ADMINISTRATION OF THE CONTRACT, NOR CERTIFICATION OF PAYMENTS, CONSTRUCTION COORDINATOR SHALL BE OWNER'S REPRESENTATIVE DURING CONSTRUCTION & UNTIL FINAL PAYMENT IS MADE. THE OWNER'S REPRESENTATIVE WILL REVIEW THE PROJECT & RENDER NECESSARY DECISIONS FOR THE PROGRESS OF THE WORK. 4. CONTRACTOR IS RESPONSIBLE TO SEE THAT WORK IN THE FIELD IS DONE IN ACCORDANCE WITH ALL CURRENT APPLICABLE NATIONAL, STATE, AND LOCAL CODES, ORDINANCES, AND REQUIREMENTS BY THE GOVERNING AGENCIES, WHETHER OR NOT SAID CODES, ORDINANCES, REQUIREMENTS, ETC ARE SPECIFICALLY SHOWN ON THE DRAWINGS AND/OR CALLED FOR IN THE SPECIFICATIDNS. 5. CONTRACTOR SHALL PROTECT ALL EXISTING ITEMS AND FACILITIES TO REMAIN THROUGHOUT CONSTRUCTION, CONTRACTOR SHALL REPAIR AND/OR REPLACE, AT CONTRACTOR'S EXPENSE, ANY EXISTING ITEMS AND FACILITIES TO REMAIN THAT ARE DAMAGED BY CONTRACTOR'S OPERATIONS TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE 6. GENERAL CONTRACTOR SHALL COORDINATE THE DEUVERY OF ALL OWNER SUPPLIED EQUIPMENT. THE CONTRACTOR IS RESPONSIBLE FOR INSPECTION OF EQUIPMENT AT THE TIME OF DELIVERY AND SHALL NOTIFY EQUIPMENT SUPPLIER OR ANY DEFICIENCIES OR DAMAGED EQUIPMENT AND ARRANGE FOR REPLACEMENT. 7. PRIOR TO EXCAVATION, DETERMINE AND VERIFY LOCATION OF UTILITY SERVICES IN ALL AREAS TO BE EXCAVATED. B. CONTRACTOR SHALL COMPLY WITH ALL PERTINENT LAWS, CODES, REGULATIONS, GOVERNING AGENCIES AND MANUFACTURE SPECIFICATION, UNLESS GREATER REQUIREMENTS ARE INDICATED, OR ARE NECESSARY FOR SAFE WORKING CONDITIONS. 9. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING JURISDICTIONS AS REQUIRED FOR INSPECTIONS AND SHALL PAY INSPECTION FEES ASSOCIATED WITH THE WORK. 10. ARCHITECT SHALL APPLY FOR ELECTRICAL HVAC MECHANICAL, AND PLUMBING PERMITS. 11. ARCHITECT, SHALL APPLY FOR ALL PERMITS WHICH INVOLVE DRAWING SUBMITTAL AND PROCESSING, BUILDING, FIRE, AND ENVIRONMENTAL HEALTH. 12. THE GENERAL CONTRACTOR SHALL PROVIDE THE OWNER'S ENGINEER WITH A CONSTRUCTION SCHEDULE PRIOR TO STARTING THE WORK, SHALL PROVIDE A QUALIFIED JOB SUPERINTENDENT THROUGHOUT THE WORK, AND PROVIDE THE OWNER WITH PHOTOS SHOWING PIPING AND ELECTRICAL TRENCHES PRIOR TO BACK FILL, AND SHALL PROVIDE A SET OF "AS BUILT" MARKUPS AT COMPLETION. 13. THE GENERAL CONTRACTOR SHALL PROVIDE BARRICADES AND SAFETY SIGN PER OSHA REQUIREMENTS. 14. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR OVERALL CONSTRUCTION SITE CLEANLINESS, INCLUDING PROVISIONS OF A DEBRIS BOX WITH REGULAR SERVICING, REMOVAL OF ALL CONTRACTOR REFUSE AND DEBRIS, AND SWEEPING OF THE ENTIRE YARD AREA AT COMPLETION OF THE WORK. 15. ALL PROCEDURES, TESTING, MATERIALS, LABOR, AND EQUIPMENT SHOWN ON THE PLANS SHALL BE FURNISHED AND INSTALLED BY GENERAL CONTRACTOR, UNLESS NOTED OTHERWISE IN THESE PLANS, EQUIPMENT OR MATERIALS NOTED ONLY AS 'FURNISHED BY OWNER' SHALL BE INSTALLED BY THE GENERAL CONTRACTOR. 16. CONTRACTORS SHALL NOT SCALE THESE DRAWINGS FOR CONSTRUCTION PURPOSES, IN THE EVENT OF OMISSION OF NECESSARY DIMENSIONS THE CONTRACTORS SHALL NOTIFY THE ARCHITECT. 17. ERRORS AND/OR OMISSIONS IN THE SCHEDULES DOES NOT RELIEVE THE CONTRACTOR FROM EXECUTING THE WORK SHOWN ON THE DRAWINGS OR DESCRIBED IN THE SPECIFICATIONS. 1B. NO HAZARDOUS MATERIALS WILL BE STORED AND/OR USED WITHIN THE BUILDING WHICH WALL EXCEED THE QUANTITIES LISTED IN THE CBC TABLE 307.1 (1) AND 307.1(2). I VICINITY MAP I PROJECT DESCRIPTION JACK IN THE BOX IS PROPOSING TO REMODEL AN EXISTING 2,196 S.F. BUILDING WITH AN EXISTING DRIVE THRU. PROJECT IS MAINTAINING EXISTING OCCUPANCY AND CURRENT USE THE PROJECT CONSISTS OF NEW EXTERIDR PAINT UPGRADE OF THE EXISTING 'JACK IN THE BOX'. NEW EXTERIOR WALL LIGHTING WILL BE ADDED TO NEW PARAPET. STRUCTURAL RETROFIT AND NEW ROOF. THE PROJECT ALSO CONSISTS OF IN INTERIOR REMODEL ADA COMPLIANT RESTROOMS, NEW DINING ROOM SEATING AND FINISHES, NEW FINISHES IN RESTROOMS, NEW LID LIGHTING THROUGHOUT BUILDING. HOURS OF OPERATION ARE 6:30AM-2:OOAM FOR THE DINING ROOM, AND 24 HR OPERATION. FOR THE DRIVE-THRU, TOTAL NUMBER OF EMPLOYEES 145 TOTAL NUMBER OF EMPLOYEES ON LARGEST SHIFT.• B UNDER SEPARATE PERMIT 1. ALL NEW BUILDING SIGNAGE CONSULTANT INFORMATION ARCHITECT: BUILDING OWNER: PM DESIGN GROUP, INC. JIB RESTRAUANT GROUP, INC. ROY PEDRO, ARCHITECT PHILIP HSIA 6930 DESTINY DR., SUITE 100 1451 SOUTH DE ANZA BLVD. ROCKLIN, CA 95677 CUPERTINO, CA 95014 PHONE: (916) 226-5487 PHONE: (406) 255-3126 CONTACT. DAVID LUNDY philip.hsla0grnall.corn dlundy®prndglnc.com MEP ENGINEER: STRUCTURAL ENGINEER: ROBISON ENGINEERING CULLUMBER ENGINEERING PAUL ROBISON, PRINCIPAL WESLEY CULLUMBER, S.E. 20300 19TH AVENUE NE 6930 DESTINY DR., SUITE 300 SHOREUNE, WA 98155 ROCKLIN, CA 95677 PHONE: (206) 364-3343 PHONE (916) 251-9798 FAX: (206) 364-3363 OWNER: JACK IN THE BOX # BUILDING ADDRESS. LEGAL JURISDICTION: PLANNING ZONE: ASSESSOR'S PARCEL NO. MUNICIPAL CODES: EXISTING BUILDING AREA: BUILDING HEIGHT. TOTAL SITE AREA: EXISTING SEATING: PROPOSED SEATING: OCCUPANCY: TYP OF NSTRUCTION: PARKING REQUIREMENTS: EXISTING: �IPROPOSED: HOURS OF OPERATION: BUILDING DATA Jack in the Box Inc. (J.I.B.) 0490 1451 SOUTH DE ANZA DLVD. CUPERTINO, CA 95014 CITY OF CUPERTINO, SANTA CLARA COUNTY, STATE OF CALIFORNIA P (CO, RES 5-15) 366-19-044 2016 CALIFORNIA ADMINISTRATIVE CODE 2016 CALIFORNIA BUILDING CODE 2016 CALIFORNA ELECTRICAL CODE 2016 CALIFORNIA MECHANICAL CODE 2016 CAUFORNIA PLUMBING CODE 2016 CALIFORNIA ENERGY CODE 2016 CALIFORNIA FIRE CODE 2016 CALIFORNIA GREEN CODE STANDARDS AND ALL APPLICABLE LOCAL AND STATE LAWS AND REGULATIONS ±2,236 S.F. (EXISTING). 1 STORY, 20' -Il - ±22,314 S.F. 34 SEATS 36 SEATS A-2 - RESTAURANT (EXISTING) V—R (NnId—CPPIMVI PR N A 1 PER 3 SEATS"= 12-SPACrS 1 PER EMPLOYEE = 7 SPACES 1 BIKE RACK PER 2000 S.F. FLOOR SPACE = 2 RACKS 19 TOTAL PARKING SPACES (18 SPACES, 1 ADA ACCESSIBLE PARKING SPACE) 4 EXISTING BIKE RACKS PROVIDED. 6:30AM-2:OOAM FOR DINING AREA 24 HOUR FOR DRIVE-THRU SHEET INDEX (TOTAL OF 8 SHEETS) in the box 9330 BALBOA AVENUE SAN DIEGO, CA 92123 ® 2007 Jack in the Box Inc. Thine deems, d—ino and epedfi-U— ore the property of Jock In the Box Inc and shall not ba topM or reproduaaE without Its preMoue written oo wL Thin dm tp dtNd ae ht..W to eedd the adAadh prpslN dh-adpl omhutim doomm6 pmUM awt r d os d- not cmpk{ Min Ns borchl@63 In the Itah otm in. wk Is to pskxmed Wey of .-b 6e n AW Inx.oy MW d woko. ods and the-ysifc -dam. DATES RELEASE: AUG. 24, 2015 P.M. UPDATES: SEPT. 22, 2016 SUBMITTAL DATE 1: 2: 3: BID: CONSTRUCTION: REVISIONS Qj Cmmm§ tan ft* Ind WR& Mab Q Unowi Eap Ph* and W& ft 7A1A7 A y SED ARC, CLO Cr 04 REN. 1/31/19 �r9TF OF CAUFO��P P �v DESIGN Architectural Solutions Group 6930 DESTINY DRIVE SUITE 100 ROCKLIN, CA 95677 191614155358 1ped,pepmdaina.Eom Roy W. Pato. A,Eh 1— "SITE INFORMATION MK TYPE: MK5F_48 ADDRESS: 1451 S. DE ANZA BLVD CUPERTI10, CA 95014 DRAWN BY.- PROJECT Y:PROJECT 7: JRG17001.0 SCALE AS NOTED TITLE SHEET TS 1.0 • • GENERAL NOTES 1. REPAINT PARKING LOT AS NEEDED. Al 2. MODIFY EXISTING IRRIGATION AS NEEDED FOR NEW PLANTINGS. 3. CITY WILL PROVIDE CONTRACTOR AT NO CHARGE, THREE "NO DUMPING FLOWS TO CREEK"STORM DRAIN INLET MARKERS FOR INSTALLATION. COORDINATE WITH ALEX WYKOFF OR CHERI DONNELLY WHEN READY PRIOR TO FINAL INSPECTION. • -9 p au� li"'u G Application S�LTi§s6b.er (E) LS TO REMAIN E) LS To (N) CANOPY OVER (E) PREVIEW MENUE) LS TO REMAIN MENU ORDER BOARD. ORDER BOARD REMAIN SEE DET. 2/SD7.1 5 00 O'00'E 140.00' ++++ ++�& _ (E) CONC. PAVEAC MENT�— + + + + a + z +++++ o g STORM DRAIN INLET MARKER, [++++++-+ - NO DUMPING /L� a, -1. +,may + + + +rr)+ + FLOWS TO CREEK" \= �+ + . + + Q+++ + 4F''' + +++ ++ + +++++++++* ca +, + a �S.* 1 +� + INSTALL (N) "BIO CLEAN 2% + ++ ++ +* ++++++++++++++++ ENVIRONMENTAL" GRATE INLET MAX I+ + TUBE STEEL POST + + + + + + + + + + + + 1 FILTERS GISB ON ALL THREE + + + + + + + + + + + + +I (E) TRASH ++++ FOR ROOF ABOVE. + + + + + + + + + + +' ENCLOSURE + (TYP OF 4) (E) SITE STORM DRAIN INLETS. + + + + + + + + + + + + + + + SEE DET. 1/SD1.1 CONTRACTOR TO VERIFY EXACT + + + + + + + + + + + + + + + + + + + + SIZING BEFORE ORDERING, TYP, i ti ++ to /\ /— BE CURB TO REMOVED 2 i +V+ + + + + + (E) LS TO REMAIN +' ++ **a + Qj R10' +++ _ +*+G �I 2V ��_ (N) CURB -Lj �"----- (E) PARKING + =,+o ++ + GE� ++++ `p+ + + 5°�%+ © —� RID RV �—i I + + +4� I i + + ++ + W+ EXTEND IRRIGATION TO + tea+ *+*+*+ (N) PLANTER AS NEEDED + +n o ++++++++++++ + Ir+ �1•(I 1 (E) LS TO + U1�--------- Ij to REMAIN 171 Ell+ I{� o� (E) STORM WATER I! O (} t+++ m "ylc * Il m FLOW LINES, TYP. II + + + u I 3 o + .o i � m t E 124'-0+'(E)t160• 7 + D 4+Jv------_--- IIt n + + 5F48/P i 2,236 SQ. FT. A 16.-0" Il � n if ,r iT i -10 (E) LS TO REMAIN U/ + (E) CONC. 4 (N) 3' WIDE . c (E) AC + + + + + + ( TRUNCATED PAVEMENT U DOMES (E) BIKE RACK J \ TO REMAIN + (E) CURB TO7 c. BE REMOVED ¢j' ut.!~J'I,'' (N) CURB O o -H Q EX'rEtdD IRRIGATION TO----' (N) PLANTER AS NEEDED] 2% STORM DRAIN INLET MARKER,—/ 12% JAX "NO DUMPING FLOWS TO CREEK" MA) (N) WASTE TRIO, RECYCLE AWAY - MODEL N1, "RECYCLE", "TRASH", & "COMPOST" LABELS, (N) CIGARETTE BUTT URN, INSTALL DOME COVERS ON ALL RECEPTACLES, TYP. (N) PUBLIC PLANT SCHEDULE O a C 6a TREES OTY BOTANICAL NAME COMMON NAME CONT WUCOLS (E) EXISTING TREES/SHRUBS TO REMAIN i Q ti? 00 ACCESSIBLE 6 LAGERSTROEMIA X 'CHEROKEE' CRAPE MYRTLE RED 15 GAL LOW 8 RHAMNUS CA 'MOUND SAN BRUNO' CA COFFEEBERRY 5 GAL LOW 130 HELICTOTRICHON SEMPERVIRENS BLUE OAT GRASS 1 GAL LOW 3 50 DIETES VEGETA AFRICAN IRIS 5 GAL LOW GENERAL NOTES 1. REPAINT PARKING LOT AS NEEDED. Al 2. MODIFY EXISTING IRRIGATION AS NEEDED FOR NEW PLANTINGS. 3. CITY WILL PROVIDE CONTRACTOR AT NO CHARGE, THREE "NO DUMPING FLOWS TO CREEK"STORM DRAIN INLET MARKERS FOR INSTALLATION. COORDINATE WITH ALEX WYKOFF OR CHERI DONNELLY WHEN READY PRIOR TO FINAL INSPECTION. • -9 p au� li"'u G Application S�LTi§s6b.er (E) LS TO REMAIN E) LS To (N) CANOPY OVER (E) PREVIEW MENUE) LS TO REMAIN MENU ORDER BOARD. ORDER BOARD REMAIN SEE DET. 2/SD7.1 5 00 O'00'E 140.00' ++++ ++�& _ (E) CONC. PAVEAC MENT�— + + + + a + z +++++ o g STORM DRAIN INLET MARKER, [++++++-+ - NO DUMPING /L� a, -1. +,may + + + +rr)+ + FLOWS TO CREEK" \= �+ + . + + Q+++ + 4F''' + +++ ++ + +++++++++* ca +, + a �S.* 1 +� + INSTALL (N) "BIO CLEAN 2% + ++ ++ +* ++++++++++++++++ ENVIRONMENTAL" GRATE INLET MAX I+ + TUBE STEEL POST + + + + + + + + + + + + 1 FILTERS GISB ON ALL THREE + + + + + + + + + + + + +I (E) TRASH ++++ FOR ROOF ABOVE. + + + + + + + + + + +' ENCLOSURE + (TYP OF 4) (E) SITE STORM DRAIN INLETS. + + + + + + + + + + + + + + + SEE DET. 1/SD1.1 CONTRACTOR TO VERIFY EXACT + + + + + + + + + + + + + + + + + + + + SIZING BEFORE ORDERING, TYP, i ti ++ to /\ /— BE CURB TO REMOVED 2 i +V+ + + + + + (E) LS TO REMAIN +' ++ **a + Qj R10' +++ _ +*+G �I 2V ��_ (N) CURB -Lj �"----- (E) PARKING + =,+o ++ + GE� ++++ `p+ + + 5°�%+ © —� RID RV �—i I + + +4� I i + + ++ + W+ EXTEND IRRIGATION TO + tea+ *+*+*+ (N) PLANTER AS NEEDED + +n o ++++++++++++ + Ir+ �1•(I 1 (E) LS TO + U1�--------- Ij to REMAIN 171 Ell+ I{� o� (E) STORM WATER I! O (} t+++ m "ylc * Il m FLOW LINES, TYP. II + + + u I 3 o + .o i � m t E 124'-0+'(E)t160• 7 + D 4+Jv------_--- IIt n + + 5F48/P i 2,236 SQ. FT. A 16.-0" Il � n if ,r iT i -10 (E) LS TO REMAIN U/ + (E) CONC. 4 (N) 3' WIDE . c (E) AC + + + + + + ( TRUNCATED PAVEMENT U DOMES (E) BIKE RACK J \ TO REMAIN + (E) CURB TO7 c. BE REMOVED ¢j' ut.!~J'I,'' (N) CURB O o -H Q EX'rEtdD IRRIGATION TO----' (N) PLANTER AS NEEDED] 2% STORM DRAIN INLET MARKER,—/ 12% JAX "NO DUMPING FLOWS TO CREEK" MA) (N) WASTE TRIO, RECYCLE AWAY - MODEL N1, "RECYCLE", "TRASH", & "COMPOST" LABELS, (N) CIGARETTE BUTT URN, INSTALL DOME COVERS ON ALL RECEPTACLES, TYP. (N) PUBLIC R/W O a C 6a I 1 y r- ,, Q O FLOWS TO II (V f} Ci0 'a r i Q ti? 00 ACCESSIBLE REMAINSE BBPUSHES TO (N) STREET IoC 0 (N) 5' WIDE PATH TREE R=20.00' SD" OF TRAVEL TO PUBLIC R.O.W. 10'-0" 5-0" 19'-1" S. DE ANZA BLVD. EXISTING PARKING EXISTING LANDSCAPE COVERAGE: COUNT: LOT = 22,314 S.F. +/- 18 STANDARD LANDSCAPE = 5,250 S.F +/- 01 ACCESSIBLE 5,250/22,314 = 24% 19 TOTAL SITE PLAN 0 SCALE 1"= 11Y _ (N) BLUE OAT GRASS, TYP (N) CU� i 2% MAX SIDEWALK N 00'00'00"E 119.9 —(E) LS AND CURB— TO BE REMOVED DRIVEWAY I! o t I� I `' INLET MAF NO DUMP I 1 y r- ,, (N) CURB FLOWS TO II (V II.' 6=_ a 5 w1 ttt RRY, Eq1 T ACCESSIBLE REMAINSE BBPUSHES TO PARKING IoC 0 b f �r h.ry R=20.00' SD" I�n (N) BLUE OAT GRASS, TYP (N) CU� i 2% MAX SIDEWALK N 00'00'00"E 119.9 —(E) LS AND CURB— TO BE REMOVED DRIVEWAY I! o t a 0 Iz A� leR� I� I `' INLET MAF NO DUMP I 1 y r- ,, vuJk pp�yyzo_ (N) BLUE' OAT GRABS, �T1P FLOWS TO (E) MONUMENT II.' 6=_ a 5 w1 ttt RRY, 1 �RJ C SIGN TO BE REMOVED I REMAINSE BBPUSHES TO IoC 0 b f �r h.ry R=20.00' SD" n ( 1% L=31.48' a 0 Iz A� leR� (N I�UBLIC R/W L R15' (D W 0 in the box 9330 BALBOA AVENUE SAN DIEGO, CA 92123 (D 2007 Jack in the BDx Inc. Thee. d.ID14 ftlnV.and edoei@otion. or. th. pr.perly o1 an k In Ne Boa Inc .nd eh.11 not be copied o, reproduced without It. proftu. written concent. Ther dvdq..ttnMM htnded to eWd tM .,bbd II pq.kp die -*t _h,,I l d__h podded IMI nrb on da. not -W Wth Nee 9o*•h9.d, hft d& h. tM _k Y to DATES RELEASE: AUG. 24, 2015 P.M. UPDATES: SEPT. 22, 2016 SUBMITTAL DATE 1: 2: 3: BID: CONSTRUCTION: REVISIONS Q Omets In B.i59 ad Nk Ihk 5/4/17 Q C..rmh Sm Ik6i9 and Adds Ih4 7/0/0 C. -Is San"cid P& ft 6/aN Q O.omb im B.®9 and Bdh k6 BA6A7 y ��SED ARC �Oy ECi 4 REN. 1/31/19 9rR OF CAV\FOR pig L DESIGN Archit30tureai Solutions Group 6930 DESTINY DRIVE SUITE 100 ROCKLIN, CA 95677 1916) 41SM9 _dr-4pmd91nc.con Roy W. Ped., ArcnI— SITE INFORMATION MK TYPE MK5F_4B JIB #: 0490 ADDRESS: 1451 S. DE ANZA BLVD CUPERTINO, CA 95014 DRAWN BY: BL PROJECT 1:JRG17001.0 SCALE AS NOTED SITE PLAN SD1.0 Slw�� Cp-v, y r- ,, vuJk pp�yyzo_ (N) BLUE' OAT GRABS, �T1P m�a fPiMq..11l ASI 4'ki ^Z2,f 6=_ a 5 w1 ttt RRY, 1 �RJ C (N) CACOFF�E"ES TYP 5�k huv-c REMAINSE BBPUSHES TO IoC 0 b rc Q41A, 1 Olt6w L-41- skdL�;n�, (TREE STREET Uj0 LL O (N) CRAPE MYRTLE TYP OF 6 __—(N) AFRICAN IRIS, TYP A?pUc, 5I"A p oj1h ndth OAe- ad,&�N�OACQ Fjr.V, 4 -we with (w) sf:-tai- -�re- i � •IAC. rc�>rk o•� w.� (N I�UBLIC R/W L R15' (D W 0 in the box 9330 BALBOA AVENUE SAN DIEGO, CA 92123 (D 2007 Jack in the BDx Inc. Thee. d.ID14 ftlnV.and edoei@otion. or. th. pr.perly o1 an k In Ne Boa Inc .nd eh.11 not be copied o, reproduced without It. proftu. written concent. Ther dvdq..ttnMM htnded to eWd tM .,bbd II pq.kp die -*t _h,,I l d__h podded IMI nrb on da. not -W Wth Nee 9o*•h9.d, hft d& h. tM _k Y to DATES RELEASE: AUG. 24, 2015 P.M. UPDATES: SEPT. 22, 2016 SUBMITTAL DATE 1: 2: 3: BID: CONSTRUCTION: REVISIONS Q Omets In B.i59 ad Nk Ihk 5/4/17 Q C..rmh Sm Ik6i9 and Adds Ih4 7/0/0 C. -Is San"cid P& ft 6/aN Q O.omb im B.®9 and Bdh k6 BA6A7 y ��SED ARC �Oy ECi 4 REN. 1/31/19 9rR OF CAV\FOR pig L DESIGN Archit30tureai Solutions Group 6930 DESTINY DRIVE SUITE 100 ROCKLIN, CA 95677 1916) 41SM9 _dr-4pmd91nc.con Roy W. Ped., ArcnI— SITE INFORMATION MK TYPE MK5F_4B JIB #: 0490 ADDRESS: 1451 S. DE ANZA BLVD CUPERTINO, CA 95014 DRAWN BY: BL PROJECT 1:JRG17001.0 SCALE AS NOTED SITE PLAN SD1.0 • �J LI Application H l giber r� 6 PAINT'TO-MATC '6& COLOR. FLASHING TO WRAP UNDERNEATH METAL STUDS. - 8 501.1 12 1� II II I I III III I I II II II II II II II II II II II II II II II II II II II II II II II OTRASH ENCLOSURE ELEVATION AEP SPAN H-36 20 GA. METAL PANEL ROOFING. COLOR: GREY ++ + AEP SPAN H-35 20 GA. METAL o B + + + iS �kdr'atrrwra�kily�.vr-•-- -` H.S.S. 4x 4x 1/4" COL 24 GA. GSM FLASHING. PAINT TO MATCH ROOF 13/16NCOLOR.FLASHING TOWRAP EXISTING TRASH CMU 'TRASH ENCLOSURE ENCLOSURE H.S.S.. 6x 4x 1/4' BEAM V -2 - HSS PER PLAN, PRIMED AND P NTED ( TYP ®REAR & SI[ 8" 0 FRONT) O5 ROOF DETAIL TUBE STEEL POST FOR ROOF ABOVE. TYP OF 4 OTRASH ENCLOSURE -ENLARGED AEP SPAN H-35 20 GA. METAL PANEL ROOFING. COLOR: GREY H.S.S. 4x 4x 1/4" COL 24 GA. GSM FLASHING. PAINT TO MATCH ROOF 13/16NCOLOR.FLASHING TOWRAP UNDERNEATH METAL /16 STUDS. CMU 'TRASH ENCLOSURE GALV. W/ (2) GALV. H.S.S.. 6x 4x 1/4' BEAM V -2 - HSS PER PLAN, PRIMED AND P NTED ( TYP ®REAR & SI[ 8" 0 FRONT) 1/2'=1'-O' 104 ROOF POST ATTACHMENT DETAIL 1/2' = 1'-D' 10 ROOF DETAIL 1/4' = V-0- / "X "X " -0" /4"x4"x4" A36 PLATE W/ (2) 1/2" 0 BOLTS 3/16 3/16 PREFABRICATED WEATHER CANOPY PROVIDED AND INSTALLED BY SIGN CONTRACTOR daIEL CONCRETE BASE TO HAVE 1RADIUS EDGES AND BE SLOPED TO DRAIN. (4)-5/870 x 36' EMBED MIN. HEADED ANCHOR RODS (4' PROJ). FURNISHED AND INSTALLED BY GEN. CDNTR.. SEE DETAIL B/SD1.1 FOR ANCHOR ROD LAYOUT _ CONC. CURB CONC. DRIVEWAY PREFAB DETECTOR LOOP FURNISHED BY OWNER & INSTALLBY CONTRACTM ED LOOP SUPPOR 14 DES 04'O.G - TOP 32', REMAINDER O 12" D.C. f t., in the box 9330 BALBOA AVENUE SAN DIEGO, CA 92123 ® 2007 Jack in the Box Inc. m These d.19n0. dncNnpe and nP dficWme arethe property of Jock N Ne Box Inc andeholl not be copled or repo dund without Iter preNoue written -ant. Thee dmk9r dtWW n htWW In aft tM odAd F ".hp dt-.* -&.:b. 6-6 proldW W A ue doe rot -W ft Ne g -1v o d In de Hole 0- Bm exk b to In pebtmed 1* A Ted tc bn n Ard m =91, Ah d W*W. orde and Wt.- d oemhic DATES RELEASE: AUG. 24, 2015 P.M. UPDATES: SEPT. 22, 2016 < SUBMITTAL DATE 1: 2: BASE COVER 3: BID: CONSTRUCTION: REVISIONS W -1h ian�(Lmd RHx Ale6514LR Tp�sl4 7 o Q fmmnU bmd Red1q and W& Tdlf lAtAl gz aEE A v Q CTR. c g TYP. 2'-D' MIN �x-DMMD cp4 FOR ELECTRJCAL RUNS REFER TO SHEET ESIA. \"l SPEAKER BOARD SECTION 1/2' = 1'-D- 1" = 1'-D' I O7 PLATE DETAIL AEP SPAN H-36 20 GA. METAL PANEL ROOFING. P COLOR: GREY q3/16 YP. (2) SMS 0 EA. VALLEY 24 GA. GSM FLASHING TO STOP AT BOTTOM OF METAL STUDS AT BEAM ... LOCATIONS. PAINT TO MATCH ROOF COLOR. (2) #12 SMS w E.31163/16 H.S.S.. 6x 4x 1/4" V-2" 0 REAR & SIDES 8" 0 FRONT) FLASHING TO WRAP Z7 UNDER METAL STUDS BETWEEN BEAMS. NOTE COORDINATE ANCHOR BOLT LAYOUT WITH SIGN CONTRACTOR PRIOR TO INSTALLATION WmX-amtmng4 1" = V-0' BOLTING TEMPLATE AT SPEAKER O AND PREVIEW BOARDS N.T.S. STEEL PIPE /2' DIA. OPENING iE PLATE NISHED AND TALLED BY SIGN !TRACTOR /2' x 5/8" HOLE TYPICAL OF 4 �aSeD ARCH/r �O't FOS, 4 REN. 1/31/19 �l9rR OF CAUFO��P Architectural Solutions Group 6930 DESTINY DRIVE SUITE 100 ROCKLIN, CA 95677 19161 4155359 �pad�a�pn'aamo.�om Roy W.Pearo.A hbect MK TYPE MK5F_48 JIB #: 0490 ADDRESS: 1451 S. DE ANZA BLVD CUPERTINO, CA 95014 DRAWN BY. PROJECT J: JRG17001.0 SCALE AS NOTED DETAILS H.S.S. 4x 4x 1/4" COL L3 X 5X �XD'X 9' GALV. W/ (2) GALV. 5/8" DIA SIMPSON O5 ROOF DETAIL WEDGE - ALL O 6' GAGE W/ 4 1/2" MIN EMBED. INSTALLPER I NST 3/16 ICC ER -3631 8'x2.5x18GA Z PURUNS - AT 2' O.C. �� S)1.1 1/4"x4"x4" A36 PLATE W/ (N) 6' CURB (2) 1/2" 0 BOLTS (N) SLAB � 3 /16 3/16 . .:. • "�"� 1 1/2" NON "i SHRINK GROUT AS W/ DBL k1/2-0 NUTS, IMBED 12- PIP 3' CLR MIN., TYP TY TYP. (2) 14 EA WAY SQUARE 4 1/2- X 4 1/2' X 1/2 - PLATE 50 KSI NOTE: F0011NO AT COLUMN LOCATION ONLY. TIE INTO CMU WALL FOOTING. H.S.S. 4x 4x 1/4" BEAM - 1/2'=1'-O' 104 ROOF POST ATTACHMENT DETAIL 1/2' = 1'-D' 10 ROOF DETAIL 1/4' = V-0- / "X "X " -0" /4"x4"x4" A36 PLATE W/ (2) 1/2" 0 BOLTS 3/16 3/16 PREFABRICATED WEATHER CANOPY PROVIDED AND INSTALLED BY SIGN CONTRACTOR daIEL CONCRETE BASE TO HAVE 1RADIUS EDGES AND BE SLOPED TO DRAIN. (4)-5/870 x 36' EMBED MIN. HEADED ANCHOR RODS (4' PROJ). FURNISHED AND INSTALLED BY GEN. CDNTR.. SEE DETAIL B/SD1.1 FOR ANCHOR ROD LAYOUT _ CONC. CURB CONC. DRIVEWAY PREFAB DETECTOR LOOP FURNISHED BY OWNER & INSTALLBY CONTRACTM ED LOOP SUPPOR 14 DES 04'O.G - TOP 32', REMAINDER O 12" D.C. f t., in the box 9330 BALBOA AVENUE SAN DIEGO, CA 92123 ® 2007 Jack in the Box Inc. m These d.19n0. dncNnpe and nP dficWme arethe property of Jock N Ne Box Inc andeholl not be copled or repo dund without Iter preNoue written -ant. Thee dmk9r dtWW n htWW In aft tM odAd F ".hp dt-.* -&.:b. 6-6 proldW W A ue doe rot -W ft Ne g -1v o d In de Hole 0- Bm exk b to In pebtmed 1* A Ted tc bn n Ard m =91, Ah d W*W. orde and Wt.- d oemhic DATES RELEASE: AUG. 24, 2015 P.M. UPDATES: SEPT. 22, 2016 < SUBMITTAL DATE 1: 2: BASE COVER 3: BID: CONSTRUCTION: REVISIONS W -1h ian�(Lmd RHx Ale6514LR Tp�sl4 7 o Q fmmnU bmd Red1q and W& Tdlf lAtAl gz aEE A v Q CTR. c g TYP. 2'-D' MIN �x-DMMD cp4 FOR ELECTRJCAL RUNS REFER TO SHEET ESIA. \"l SPEAKER BOARD SECTION 1/2' = 1'-D- 1" = 1'-D' I O7 PLATE DETAIL AEP SPAN H-36 20 GA. METAL PANEL ROOFING. P COLOR: GREY q3/16 YP. (2) SMS 0 EA. VALLEY 24 GA. GSM FLASHING TO STOP AT BOTTOM OF METAL STUDS AT BEAM ... LOCATIONS. PAINT TO MATCH ROOF COLOR. (2) #12 SMS w E.31163/16 H.S.S.. 6x 4x 1/4" V-2" 0 REAR & SIDES 8" 0 FRONT) FLASHING TO WRAP Z7 UNDER METAL STUDS BETWEEN BEAMS. NOTE COORDINATE ANCHOR BOLT LAYOUT WITH SIGN CONTRACTOR PRIOR TO INSTALLATION WmX-amtmng4 1" = V-0' BOLTING TEMPLATE AT SPEAKER O AND PREVIEW BOARDS N.T.S. STEEL PIPE /2' DIA. OPENING iE PLATE NISHED AND TALLED BY SIGN !TRACTOR /2' x 5/8" HOLE TYPICAL OF 4 �aSeD ARCH/r �O't FOS, 4 REN. 1/31/19 �l9rR OF CAUFO��P Architectural Solutions Group 6930 DESTINY DRIVE SUITE 100 ROCKLIN, CA 95677 19161 4155359 �pad�a�pn'aamo.�om Roy W.Pearo.A hbect MK TYPE MK5F_48 JIB #: 0490 ADDRESS: 1451 S. DE ANZA BLVD CUPERTINO, CA 95014 DRAWN BY. PROJECT J: JRG17001.0 SCALE AS NOTED DETAILS PHOTOS EXISTING LANDSCAPING TO REMAIN. PHOTO 10 EXISTING LANDSCAPING AND DRIVE THRU TO REMAIN. PHOTO 11 EXISTING PLANTERS TO REMAIN. PHOTO 12 EXISTING PLANTERS TO REMAIN. PHOTO 7 EXISTING LANDSCAPING TO REMAIN. PHOTO 00 EXISTING LANDSCAPING TO REMAIN. PHOTO 5 EXISTING LANDSCAPING TO REMAIN. PHOTO 6 EXISTING LANDSCAPING TO REMAIN. EXISTING AERIAL SCALE: N/A NORTH 8, �f PHOTO 1 EXISTING LANDSCAPING TO REMAIN. PHOTO 2 EXISTING PLANTERS TO REMAIN. O'�3 EXISTING LANDSCAPING TO REMAIN. 1cation Number PHOTO 4 EXISTING LANDSCAPING TO REMAIN. h Lhe box 9330 BALBOA AVENUE SAN DIEGO, CA 92123 ® 2007 Jack in the Box Inc. Th.. defq N deadn9e end spedfcotlone ars the property of Jock In the Boz Inc and shell not be copled or reproduced without Its preAms wrltten consent. Thee dree p dtodW m htedel to dA Ire cdde:i h pegip at^'olpl aebxlm d kch polled 1wt ed, m tlos not -W Nth Was gnwnhg mohlIe:b In the elle dvn the sok Is In W pwb c t They e1 red b be WW In emply MN.1.05cble mdee ed dfe-Vp k -dtkne. DATES RELEASE AUG. 24, 2015 P.M. UPDATES: SEPT. 22, 2016 SUBMITTAL DATE 1: 2: 3: BID: CONSTRUCTION: REVISIONS A r=m iml Rama ed Mlic Wab 5/1/17 Q krvnls Ian N* ad RNc Ihh 7/12/17 A A A A y SED A RCH�TF �O O� 4 REN. 1/31/19 Jj,9rFOF CAUFOR�P P,,,-7 k` DESIGN ArshIT, ItDraI _&Wuflons Group 6930 DESTINY DRIVE SURE 100 ROCKLIN, CA 95677 (916141SSM iped,o®pmdainc.com Roy W. Pereo, Archbeet SITE INFORMATION MK TYPE: MK5F_48 JIB $: 0490 ADDRESS: 1451 S. DE ANZA BLVD CUPERTINO, CA 95014 DRAWN BY: PROJECT f: JRG17001.0 SCALE: AS NOTED PHOTO LANDSCAPE PLAN Ll .0 FLOOR PLAN DEMO KEY NOTES O7 (E) ENTRY DOOR TO REMAIN. - O(E) WINDOWS AND STOREFRONT TO REMAIN. O3 (E) ELECTRICAL PANEL/ METERS TO REMAIN. O4 (E) ROOF LADDER LOCATION TO REMAIN. O5 (E) WALK—IN COOLER/ FREEZER TO REMAIN. OREMOVE AND DISPOSE EXISTING DINING FURNITURE, PARTIAL HEIGHT WALLS, COUNTERS AND 6 WALL TRIMS, AND TILE FLOORING THROUGHOUT. REMOVED EXISTING WALL FINISHES TO GYP BOARD SHEATHING AND/OR REPLACE GYP BOARD IN Oj IRREPARABLE AREAS FOR INSTALLATION OF NEW INTERIOR FINISHES. PREPARE SURFACES AND PATCH ANY DAMAGES DUE TO DEMOLITION. REFER TO INTERIOR ELEVATIONS OB REMOVE (E) SERVICE COUNTER, SURROUNDING FINISHES, AND EQUIPMENT. PREP FOR (N) WORK. O(E) DOOR AND FRAME TO BE REMOVED. 10 REMOVE (E) DOOR AND FRAME AND PREP FOR (N). 11 REMOVE (E) FRP PANELS AS REQ'D AND PREP FOR NEW. FIELD VERIFY (E) CONDITIONS. 12 REMOVE (E) RESTROOM FIXTURES, WALL & FLOOR FINISHES AND PREP FOR (N) WORK. 13 (E) KITCHEN EQUIPMENT — PROTECT IN PLACE OR REMOVE OR REMOVE EQUIPMENT PRIOR TO CONSTRUCTION 14 (E) DRINK STATION TO REMAIN. PROTECT IN—PLACE OR REMOVE EQUIPMENT. REMOVE (E) WALL PAPER GRPAHICS. WALK IN WALK IN 11 1°6 DRYSTORAGE 104 13 11 FREEZER 09 COOLER ofi /TI ALL QUANTITIES BEFORE ORDERING AND INSTALLING MATERIAL O O AND BE RE—USED. GC TO ENSURE SECURE STORAGE DURING INTERIOR WORK PRIOR TO RE—INSTALLATION. i n t h e box 5. GC IS RESPONSIBLE FOR VERIFICATION OF EXISTING CONDITIONS PRIOR �' "`. 2>., SAN DIEGO, CA 92123 WORKSTATON. I 106 EMPLOYEE 107 " 13 O GALLEY/PREP 11 1°6 KITCHEN 13 Fl—ml�11\ /TI EXISTING/ DEMO FLOOR PLAN SCALE: 3/16"=1'-0" FLOOR PLAN KEY NOTES ONEW SERVICE COUNTER. SEE DETAIL 18/ID3.0. O(E) DRINK STATION EQUIPMENT TO BE REINSTALLED AT SAME LOCATION. GC TO PROVIDE PROTECTION AT CONNECTIONS AS REQ'D, OINSTALL NEW ® AT AREAS WHERE DAMAGED AND OR BUCKLING. FIELD VERIFY O4 WALL FURRING, SEE DETAIL 12/1D3.0. 5 END CAP ON WALL TO BE FLUSH W/ SOFFIT FINISH ABOVE SEE INTERIOR DETAILS FOR ADDITIONAL INFORMATION. (ig FORODL•O WASOTNE . CMOANTTCAHI ADJACENT CONSIRUC110N, FINISHES, ETC. " WASTE CONTAINER. Q 1 GENERAL NOTES DRAWN BY: 1. ALL HEIGHTS SHOWN ARE FROM TOP OF F.F. PROJECT $: JRG17001.0 2. DIMENSIONS ARE FROM FINISH FLOOR AND/OR FINISHED DRYWALL SCALE AS NOTED 3. IT SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBIUTY TO VERIFY ' ALL QUANTITIES BEFORE ORDERING AND INSTALLING MATERIAL FLOOR PLAN A1.0 4. GC TO COORDINATE WITH CM/OWNER FOR ALL EQUIPMENT TO REMAIN AND BE RE—USED. GC TO ENSURE SECURE STORAGE DURING INTERIOR WORK PRIOR TO RE—INSTALLATION. i n t h e box 5. GC IS RESPONSIBLE FOR VERIFICATION OF EXISTING CONDITIONS PRIOR 9330 BALBOA AVENUE TO BID/CONSTRUCTIION. IT IS THE RESPONSIBILITY OF THE GC TO SAN DIEGO, CA 92123 NOTIFY THE ARCHITECT AND/OR M OF FIELD CONDITIONS ONFIJC7ING WITH CONSTRUCTION DOCUMENTS PRIOR RIOR TO NEW WORK ® 2007 Jack in the Box Inc. PERFORMED. Th.. d.1gn% d,aan9. and epad6mVm SOLID6. PROVIDE 2x SD BLOCKING IN WALLS AS REQUIRED FOR ... the prapaty a1 Jack In the B°. Inc ane . not en e.P"d °r raprod"d REINFORCEMENT OF ALL GRAB BARS, RESTROOM FIXTURES, PLUMBING "Ithaut lee prW.. -Ittan °anaanL LINES, WALL BUMPERS AND MILLWORK ATTACHMENT, ETC. me,. & .tq dt d d as nt.W m ..M tn. 7. ALL EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT ANY .M.t In PWN A,-* &W. d --b VIAW ftd..nk - dm not amnia alts Id. dftN In b. SPECIAL KNOWLEDGE OR EFFORT OR THE USE OF A KEY. W Apel d IM" W t bM d� �y aM m .pplbde mJs miE +IrgedAe mndOma B. ALL EXTERIOR DOORS SHALL BE WEATHER—STRIPPED. ALL EXTERIOR DATES JOINTS AROUND DOOR FRAMES &WINDOWS & AT ALL PENETRATIONS THROUGH BUILDING ENVELOPE SHALL BE SEALED USING SEALANT & CAULKING. ADDITIONALLY, FOAM INSULATION SHALL BE PROVIDED IN & RELEASE: AUG. 24, 2015 AROUND ALL WINDOW AND/OR DOOR FRAMES WHERE METAL MEETS P.M. UPDATES: SEPT. 22, 2016 WOOD FRAMING PLUS ALL EXTERIOR WALL OPENINGS/PENETRATIONS. 9. ALL GLAZING WITHIN 48" OF DOORS & 18" FROM FINISHED FLOOR SHALL SUBMITTAL DATE BE TEMPERED INCLUDING GLAZING OF DOORS. 1: 10. POST OCCUPANCY LOAD SIGN IN CONSPICUOUS PLACE NEAR MAIN EXITS 2: AT W-10" A.F.F. CAULK AROUND ALL SIDES. "MAXIMUM SEATING CAPACITY — 45. FOR SEAT COUNT, SEE "BUILDING DATA" ON COVER 3: SHEET. 11. ALL NEW FINISH SURFACES SHALL HAVE A FLAME SPREAD BID: CLASSIFICATION OF CLASS C OR HIGHER (FLAME SPREAD INDEX 76 200 & A SMOKE DENSITY RATING OF 450). CONSTRUCTION: REVISIONS 12. ALL DRAPES. CURTAINS & DECORATIVE MATERIAL PROVIDED AND/OR INSTALLED BY THE GENERAL CONTRACTOR SHALL BE MADE FROM A W.� to Bares ud R*Mut+5/4/0 NONFLAMMABLE MATERIALS OR TREATED WITH FLAME RETARDANT AS APPROVED BY THE LOCAL FIRE MARSHAL Q Gtxrmh w R a� Pic w ImAl 13. OWNNERATIN SHALL PROVIDE PORTABLE FIRE EXTINGUISHERS PER LOCAL FIRE Q 0 14. GENERAL CONTRACTOR TO INSTALL BUILDING ADDRESS NUMBERS SHALL Q BE A MINIMUM 127 HIGH AND BE OF CONTRASTING COLORS. Q I& ANY TIME THE BUILDING IS OCCUPIED, THE MEANS OF EGRESS SHALL BE ILLUMINATED AT AN INTENSITY OF NOT LSCS THAN 1 FOOT—CANDLE AT THE FLOOR LEVEL SEE ELECTRICAL DRAWINGS 16. PROVIDE APPROVED EGRESS ILLUMINATION AND ILLUMINATED EXIT SIGNS. SEE ELECTRICAL DRAWINGS 17. PROVIDE APPROVED PANIC HARDWARE ON EXIT DOORS IS. EXIT AISLES SHALL MEET ALL APPLICABLE CODES. 19. GC TO VERIFY WITH CM/OWNER ALL RESTROOM EQUIPMENT TO REMAIN AND BE RE—USED PENDING CONDITION. A RCy/T �aSED y U4 REN. 1/31/19 �T9TFOF CAL\FO��P `Y DESIGN A r C h i ie o t u Cal Solutions Group 6930 DESTINY DRIVE SURE 100 ROCKLIN, CA 95677 Applicatflon ` lupi ibor MK TYPE: MK5F_48 JIB 1: 0490 _—Q ADDRESS: 1451 S. DE ANZA BLVD CUPERTINO, CA 95014 @,u a 6ureWvT: FLOOR PLAN SCALE: 3/16'=l DRAWN BY: PROJECT $: JRG17001.0 SCALE AS NOTED DEMO/ PROPOSED NORTH z FLOOR PLAN A1.0 ROOF PLAN DEMO KEY NOTES D1 EXS71NO MANSARD STEEL FRAMING TO BE REMOVED IN ITS ENTIRETY AS SHOWN. REMOVE EKISTING ROOFING OVER STRUCTURE IN ITS ENTIRETY. D2 GC TO VERIFY CONDITION OF PLYWOOD DECKING AND REPLACE 6 WHERE DAMAGED, TYP. D3 EXISTING ROOF ACCESS HATCH LOCATION TO REMAIN. 04 18' SECTION OF CANOPY OVERHANG TO BE REMOVED. SEE SHEETS A6.0 FOR DETAILS EXISTING ROOF CONDENSORS, RTU'S, AND ROOF EQUIPMENT IN DS SERVICE TO BE REMOVED AND SECURED IN STORAGE FOR RE—INSTALLATION AFTER NEW ROOF WORK IS COMPLETED. ROOF TOP EQUIPMENT CURBS TO BE REMOVED AND REPLACED D6 WITH NEW. MAINTAIN 8' MIN ABOVE TAPERED INSULATION AT ALL LOCATIONS. --------------- _7_—______—___ I I;r'------------------------------------------------ I II I I I 1 I I III n n I III II -----JI I III I I I III I I I 11 I I I I LII I J L____� L_J I III / D3 I I II I II rp. O 1 III T I � III D2 I III BS TYP. ` II I 08 TIP. O I ry, j II I R_.�ri i III I I y FLS >y L I >< F�---r-I 1 III I 1 I I I i iii r -r F_� i ---- i =a r -r- _-r---- i =a III L I �y I I II I I L I I -- I I II I I I I I II ii L_J I I ffI1 II ii I I Ii 1 I 71P. 1—T___ I------------------------------------------ L_ TIP. _____________________ _04. EXISTING/ DEMO ROOF PLAN SCALE: 3/16•=1' ROOF KEY NOTES ONEW MEMBRANE ROOFING OVER CONTINUOUS ROOF DECK TAPERED INSULATION. 50 MIL DUROLAST 15 YEAR NOL ROOF LABOR & MATERIAL PER JIB. ONEW PARAPET BRACE. O3 NOT USED O4 EXISTING ROOF TOP EQUIPMENT TO BE PLACED ON NEW CURBS OREINSTALL RAISED PARAPET WALLS, PATCH AS REQUIRED. O(E) LED WALL WASHER LIGHTS, SEE ELECTRICAL DRAWINGS OEXISTING ROOF HATCH ACCESS HATCH. ENSURE HEIGHT A90VE TAPERED INSULATION TO AVOID WATER INFILTRATION. OB REINSTALL JIB WALL SIGNAGE. SEE EXTERIOR ELEVATIONS OLINE OF WALK—COOLER WALLS BELOW. 10 (N) PERIMETER METAL FASCIA AND GUTTER. GENERAL NOTES 1. FOR ROOF FRAMING AND PLYWOOD LAYOUT INFORMATION, SEE STRUCTURAL DRAWINGS 2 (E) ROOF TOP MECHANICAL EQUIPMENT TO BE RE—INSTALLED PER PREVIOUS LOCATIONS. 3. CURBS AND BASES FOR HVAC UNITS AND EXHAUST FANS SHALL BE INSTALLED LEVEL BY G.C. HVAC UNITS AND EXHAUST FANS SHALL BE HOISTED, SET IN PLACE, AND SECURED TO ROOF CURBS OR BASES BY G.C. AND PER MANUFACTURER'S INSTRUCTIONS 4. WALK IN BOX ROOF TOP UNIT SHALL BY HOISTED, SET IN PLACE AND SECURED TO ROOF CURB BY G.C. ROOF CURB AND EQUIPMENT PLATFORM BY G.C. 5. ICE MACHINE ROOF TOP UNITS SHALL BE HOISTED, SET IN PLACE AND SECURED TO ROOF CURB BY ICE MACHINE INSTALLER. ROOF CURB AND EQUIPMENT PLATFORM BY G.C. 6. REFER TO STRUCTURAL DRAWINGS FOR MORE INFO. A Pp 1LLl'�1 __C LU b, arLq 5 TYP. a VA ,7A 17A TYP. III 3 TYP. III In EF 4 III I I I O I I II II A 1 I 1 II II 1 I I I (E) arm. (q Can I II I 110 II 4 I I I (n RTU 11 19A 1 �IL--- I AC 2 JI Z® —JI ---- — Ip I —J f I 1A1 1 I I I OI (E) ff , (q ff 2 I I 5 TYR I (� EYP. ® (k) ILIA t (4 EF 3 4 I e I ,A I I I ((��I ® "FCR70 ® 1142 I 5 I 1YP. I I I 11A_ I 1 I I I I I I _____ ------------ - 17A 17A 4 5 5 TYP. � PROPOSED ROOF PLAN SCALE: 3/16'=1'-0• NORTH Z in the box 9330 BALBOA AVENUE SAN DIEGO, CA 92123 ® 2007 Jack in the Box Inc. These dwign% ftwin. and ar the swoop" c/ Jock In �thee B.. Ina and ehoil not be copied or reproduced without Ito preeloue written caneant. Ther haYge ottodetl hteMet to -M the addled h � oaeNeSm deurmb polled fhd Id weh I® dor not _ 1%. *[&,I k r bepb9e beed 7*tee, 1.. tb...16e eekbto xhdvvimer.neattobeP ftm=ar am a oppikme mace as +la-adk m,muaa DATES RELEASE AUG. 24, 2015 P.M. UPDATES: SEPT. 22, 2016 SUBMITTAL DATE- 1: ATE1: 2: 3: BID: CONSTRUCTION: REVISIONS A l'aamlh 1>m %* ala BR& ft sA/D Q NmmU Pan Bang ad a* kah 7A1/0 0 0 A �aSED A RCN/T �Oy FOS, 04 REN. 1/31/19 ��9TR OF CAUFO��P pi, id DESIGN .. Architectural Solutions Group 6930 DESTINY DRIVE SURE 100 ROCKLIN, CA 95677 191614155358 rped,o a Pmdginc.com Roy W.Pee..Arahi t SITE INFORMATION MK TYPE MK5F_48 JIB #: 0490 ADDRESS: 1451 S. DE ANZA BLVD CUPERTINO, CA 95014 DRAWN BY - PROJECT #: JRG17001.0 SCALE: AS N01ED DEMOIPROPOSED ROOF PLAN A3.0 1 2 =D- — - —------------------------ DEMO KEY NOTES OREMOVE EXISTING MANSARD STRUCTURE IN ITS ENTIRETY. TO COORDINATE REMOVAL OF EXISTING OGC CANOPY SHORING DURING/AFTER REINFORCEMENT OF EXISTING STRUCTURE, REFER TO STRUCT. OREMOVE EXISTING SIGNAGE OREMOVE 18' OF CANOPY FRAMING AND PREPARE FOR NEW FINISHES EXISTING FRONT ELEVATION - WEST x}12'—D• NF 4L1rcAA0725'— a, -e_ Los- Applitcaqon Number 3e Manager EXISTING LEFT ELEVATION - NORTH S C A L E: 3/16.= T -D• +19'-4 — vf�CFNOpY— NEW LEFT ELEVATION - NORTH S C A L E : 3/16•= -D• -NEW FRONT ELEVATION - WEST S C A L E: 3/16"= 1'-0' EXTERIOR FINISH SCHEDULE USE CHECKED BOX ONLY of MATERIAL/FINISH ANTI -GRAFFITI COATING: DUMOND CPU647 GRAFFITI BARRIER Na7— COLOR COAT BY DUMOND CHEMICALS INC. (212) 859-6350 COLOR: CLEAR MATERIALIFINISH: 01 EXTERIOR CEMENT PLASTER- SAND FLOAT FINISH (SEE SPECIFICATIONS) 0 INTEGRAL COLOR ❑ SHERWIN WILLIAMS SHERLASTIC 100% ACRYLIC ELASTOMERIC COATING ®EXTERIOR INSULATION FINISHING SYSTEM (EIFS) AS ALTERNATE, CONTRACTOR TO SUBSTITUTE EIFS IN LIEU OF EXTERIOR CEMENT PLASTER 02 AWNING/CANOPY & SUPPORT (BY SIGN CONTRACTOR) 03 NOT USED 04 (E) ALUMINUM STOREFRONT SYSTEM El 1" CLEAR INSULATED GLASS 1" CLEAR INSULATED GLASS W/ SOLARBAN 70XL COATING ❑1" CLEAR INSULATED GLASS AN11-GRAFFITI FILM W/ SOLARBAN 60 COATING 05 NOT USED 06 INTERNALLY ILLUMINATED SIGNAGE (O.F.0.1., NOT A PART OF THIS PERMIT) 07 NEW PRE -FINISHED METAL FASCIA 08 NEW WALL WASH FLOOD LIGHT, REF ELECTRICAL 09 NOT USED 10 12" HIGH BUILDING ADDRESS LETTERS (AS REQUIRED PER LOCAL JURISDICTION) 11 MAIN ELECTRICAL SERVICE 12 NOT USED 13 HOLLOW METAL DOORS AND FRAMES, MISCELLANEOUS TRIM 14 ALUMINUM COPING 15 CO2 FILL BOX METAL COVER 16 (E) BRICK VENEER SLUMPSTONE 17 NOT USED 18 MOUNT LIGHT FIXTURE WITHIN CANOPY 19 WALL MOUNTED LIGHT FIXTURE 20 NOT USED 21 DISPLAY POSTER PANEL AND SURROUND OF-Eg1 OF-Eg19 22 NOT USED 23 ENTRANCE DISPLAY HOURS PANEL <---- Eq 24 DRIVE-THRU WINDOW TREATMENT AND DISP ANEL 25 FEATURE WINDOW POP OUT W/ALUMINUM BREAK METAL PANELS & ILLUMINATED LIGHT BOX COLOR: A SHERWIN WILLIAMS: SW 7015 "REPOSE GRAY" B SHERWIN WILLIAMS: SW 6321 "RED BAY" C STANDARD STOREFRONT. CLEAR ANODIZED D WHITE TEXT ON RED BACKGROUND E CLEAR ANODIZED F COLOR/FINISH TO MATCH ADJACENT SURFACE G SHERWIN WILLIAMS: SW 6990 "CAVIAR" H POWDERCOATED ANODIZED SILVER J MARC, AV294 K SHERWIN WILLIAMS: SW 7020 "BLACK FOX' L NATURAL CONCRETE, GRAY M STAINLESS STEEL N SHERWIN WILLIAMS: SW 7018 "DOVETAIL" 0 NOT USED P PAINT TO MATCH CLEAR ANODIZED ALUMINUM, TIGER DRYLAC 38/91020 R PRE—FINISHED "DARK BRONZE". GENERAL NOTES: 1. ALL SIGNAGE IS UNDER SEPARATE SUBMITTAL AND PERMIT (N.I.C.). 2. C.J. = PLASTER CONTROL JOINT 3. ALL PLASTER ACCESSORIES, FLASHINGS ETC. SHALL BE PAINTED TO MATCH ADJACENT SURFACES. (U.O.N.). 4. ALL EXTERIOR WALL OPENINGS FOR RECEPTACLES, HOSE BIBBS, ETC. SHALL BE SEALED. SEE FLOOR PLAN, GENERAL NOTES, AND SPECIFICATIONS FOR ADDITIONAL NOTES. in the box 9330 BALBOA AVENUE SAN DIEGD, CA 92123 ® 2007 Jack in the Box Inc. Thee deyn% dra inoe and rwedecosone re the property of Jock In the Box Inc and ""I not be eoPled or reproduced "Ithcut Its preMoue written —..L Thee droa,gr atlatd ue hteWm b oem� Be vd8 1 F p¢a}q dle-otgt oxa6udin dxemb ptmt/ed Mm e,m - des not cme11 eM de 9awnb9 mr:10 h In the gate A. tls eek b b xdrde ajenatomm1,-. y elfm mtmYn. DATES RELEASE: AUG. 24, 2015 P.M. UPDATES: SEPT. 22, 2016 SUBMITTAL DATE 1: 2: 3: BID: CONSTRUCTION: REVISIONS rmem b tm1Pb* m11& M 514AT p Numb tme%* and ft* kt, IA7A7 0 ��SED ARCHiT F a REN. 1/31/19 sl9TFOF CAUFO��e DESIGN ArehiteGtural Solutions Group 6930 DESTINY DRIVE SUITE 100 ROCKLIN, CA 95677 191614155 rpedro�pmtlBinc.com Roy W. Pedro. ArcM1ltact SITE INFORMATION MK TYPE MK5F_48 JIB #: 0490 ADDRESS: 1451 S. DE ANZA BLVD CUPERTINO, CA 95014 DRAWN BY. PROJECT #: JRG17001.0 SCALE: AS NOTED EXTERIOR ELEVATIONS A4.0 ��,,221g-a VLQP- — 1$T.12'— T.VIF C,NOR— VAI DEMO KEY NOTES OREMOVE 1 ENTIRETY. 2 GC TO COORDINATE REMOVAL OF EXISTING OZ CANOPY SHORING DURING/AFTER REINFORCEMENT DEMO KEY NOTES OREMOVE EXISTING MANSARD STRUCTURE IN ITS ENTIRETY. GC TO COORDINATE REMOVAL OF EXISTING OZ CANOPY SHORING DURING/AFTER REINFORCEMENT OF EXISTING STRUCTURE, REFER TO STRUCT. OREMOVE EXISTING SIGNAGE OREMOVE 18" OF CANOPY FRAMING AND PREPARE FOR NEW FINISHES. EXISTING REAR ELEVATION - EAST 31B• -Ir ___ __ 31Y—D' VIF i C,U10PY— I L----- — -�L---- — — APPROVAL Dhl141 .-- @o FIXTURE ARI + N TYP. D7 -_07 18 18 21 18 16 a8 N A — N A A �;�Ip9ica��0�1 Number '-NEW REAR ELEVATION - EAST EXISTING RIGHT ELEVATION — SOUTH SCALE: 3/16"= 1'-0" +wi 4 NEW RIGHT ELEVATION - SOUTH S C A L E: 3/16.= V-0" 18 ZI 16 18 N A N SCALE: 3/16"=1•-0• EXTERIOR FINISH SCHEDULE USE CHECKED BOX ONLY m MATERIAL/FINISH ANTI -GRAFFITI COATING: DUMOND CPU647 GRAFFITI BARRIER \-L/— COLOR COAT BY DUMOND CHEMICALS INC. (212) 869-6350 COLOR: CLEAR MATERIAL/FINISH: 01 EXTERIOR CEMENT PLASTER- SAND FLOAT FINISH (SEE SPECIFICATIONS) ❑ INTEGRAL COLOR ❑ SHERWIN WILUAMS SHERLASTIC 100% ACRYLIC ELASTOMERIC COATING ®EXTERIOR INSULATION FINISHING SYSTEM (EIFS) AS ALTERNATE, CONTRACTOR TO SUBSTITUTE EIFS IN LIEU OF EXTERIOR CEMENT PLASTER 02 AWNING/CANOPY & SUPPORT (BY SIGN CONTRACTOR) 03 NOT USED 04 (E) ALUMINUM STOREFRONT SYSTEM 1" CLEAR INSULATED GLASS 1" CLEAR INSULATED GLASS ❑ W/ SOLARBAN 70XL COATING ❑1" CLEAR INSULATED GLASS ANTI -GRAFFITI FILM W/ SOLARBAN 60 COATING 05 NOT USED 06 INTERNALLY ILLUMINATED SIGNAGE (O.F.0.1., NOT A PART OF THIS PERMIT) 07 NEW PRE -FINISHED METAL FASCIA 08 NEW WALL WASH FLOOD LIGHT, REF ELECTRICAL 09 NOT USED 10 12" HIGH BUILDING ADDRESS LETTERS (AS REQUIRED PER LOCAL JURISDICTION) 11 MAIN ELECTRICAL SERVICE 12 NOT USED 13 HOLLOW METAL DOORS AND FRAMES, MISCELLANEOUS TRIM 14 ALUMINUM COPING 15 CO2 FILL BOX METAL COVER 16 (E) BRICK VENEER SLUMPSTONE 17 NOT USED 18 MOUNT LIGHT FIXTURE WITHIN CANOPY 19 WALL MOUNTED LIGHT FIXTURE 20 NOT USED 21 DISPLAY POSTER PANEL AND SURROUND OF -E018 OF -E019 22 NOT USED 23 ENTRANCE DISPLAY HOURS PANEL <----OF-45 24 DRIVE-THRU WINDOW TREATMENT AND DISP ANEL 25 FEATURE WINDOW POP OUT W/ ALUMINUM BREAK METAL PANELS & ILLUMINATED UGHT BOX COLOR: A SHERWIN WILUAMS: SW 7015 "REPOSE GRAY" B SHERWIN WILLIAMS: SW 6321 "RED BAY" C STANDARD STOREFRONT: CLEAR ANODIZED D WHITE TEXT ON RED BACKGROUND E CLEAR ANODIZED F COLOR/FINISH TO MATCH ADJACENT SURFACE G SHERWIN WILLIAMS: SW 6990 "CAVIAR" H POWDERCOATED ANODIZED SILVER J MARC, AV294 K SHERWIN WILLIAMS: SW 7020 "BLACK FOX" L NATURAL CONCRETE, GRAY M STAINLESS STEEL N SHERWIN WILLIAMS: SW 7018 "DOVETAIL" 0 NOT USED P PAINT TO MATCH CLEAR ANODIZED ALUMINUM, TIGER DRYLAC 38/91020 R PRE -FINISHED "DARK BRONZE". GENERAL NOTES: 1. ALL SIGNAGE IS UNDER SEPARATE SUBMITTAL AND PERMIT (N.I.C.). 2. C.J. = PLASTER CONTROL JOINT 3. ALL PLASTER ACCESSORIES, FLASHINGS ETC. SHALL BE PAINTED TO MATCH ADJACENT SURFACES. (U.O.N.), 4. ALL EXTERIOR WALL OPENINGS FOR RECEPTACLES, HOSE BIBBS, ETC. SHALL BE SEALED. SEE FLOOR PLAN, GENERAL NOTES, AND SPECIFICATIONS FOR ADDITIONAL NOTES. in the box 9330 BALBOA AVENUE SAN DIEGO, CA 92123 ® 2007 Jack in the BDx Inc. Throe dedpa4 drvNnpe and giedficWme are the prapwty d Jack Ia the Boa Inc andshall not be tV'l ar repr"da d "ith.t Its P-1— written -L These &.*,p dbdmd — ht.W to —W the .MH d h PRohp it - W =A e- dnmwte p Wd.d the adl Im does wl _w mth Nw 9— g otddI b h B" dot, dmm U. -,k Is b h pcko i Tm eH -d b Ee nvdrd b o.#, dN d wpkw. w . wd eHe-pedik mndu.. DATES RELEASE: AUG. 24, 2015 P.M. UPDATES: SEPT. 22, 2016 SUBMITTAL DATE 1: 2: 3: BID: CONSTRUCTION: REVISIONS p fmmmh iml Romig and PHP ft 5/4AI 0 W_m fon Rmrd9 and Pt& W* 7n2AI 1 aStD ARCy/J �Oy �Ot 04 REN.1/31/19 ✓'q JF OF CAUFO�?P DESIGN XiYCE€[tE0tDr1I Solutions Group 6930 DESTINY DRIVE SUITE 100 ROCKLIN, CA 95677 19161 4155358 'Pedr0iP dgm" ,m ROY W. Pe 1, A -1-t SITE INFORMATION MK TYPE: MK5F_48 JIB #: 0490 ADDRESS: 1451 S. DE ANZA BLVD CUPERTINO, CA 95014 DRAWN BY: PROJECT #: JRG17001.0 SCALE AS NOTED EXTERIOR ELEVATIONS A4.1 " v -_07 18 18 21 18 16 a8 N A — N A A �;�Ip9ica��0�1 Number '-NEW REAR ELEVATION - EAST EXISTING RIGHT ELEVATION — SOUTH SCALE: 3/16"= 1'-0" +wi 4 NEW RIGHT ELEVATION - SOUTH S C A L E: 3/16.= V-0" 18 ZI 16 18 N A N SCALE: 3/16"=1•-0• EXTERIOR FINISH SCHEDULE USE CHECKED BOX ONLY m MATERIAL/FINISH ANTI -GRAFFITI COATING: DUMOND CPU647 GRAFFITI BARRIER \-L/— COLOR COAT BY DUMOND CHEMICALS INC. (212) 869-6350 COLOR: CLEAR MATERIAL/FINISH: 01 EXTERIOR CEMENT PLASTER- SAND FLOAT FINISH (SEE SPECIFICATIONS) ❑ INTEGRAL COLOR ❑ SHERWIN WILUAMS SHERLASTIC 100% ACRYLIC ELASTOMERIC COATING ®EXTERIOR INSULATION FINISHING SYSTEM (EIFS) AS ALTERNATE, CONTRACTOR TO SUBSTITUTE EIFS IN LIEU OF EXTERIOR CEMENT PLASTER 02 AWNING/CANOPY & SUPPORT (BY SIGN CONTRACTOR) 03 NOT USED 04 (E) ALUMINUM STOREFRONT SYSTEM 1" CLEAR INSULATED GLASS 1" CLEAR INSULATED GLASS ❑ W/ SOLARBAN 70XL COATING ❑1" CLEAR INSULATED GLASS ANTI -GRAFFITI FILM W/ SOLARBAN 60 COATING 05 NOT USED 06 INTERNALLY ILLUMINATED SIGNAGE (O.F.0.1., NOT A PART OF THIS PERMIT) 07 NEW PRE -FINISHED METAL FASCIA 08 NEW WALL WASH FLOOD LIGHT, REF ELECTRICAL 09 NOT USED 10 12" HIGH BUILDING ADDRESS LETTERS (AS REQUIRED PER LOCAL JURISDICTION) 11 MAIN ELECTRICAL SERVICE 12 NOT USED 13 HOLLOW METAL DOORS AND FRAMES, MISCELLANEOUS TRIM 14 ALUMINUM COPING 15 CO2 FILL BOX METAL COVER 16 (E) BRICK VENEER SLUMPSTONE 17 NOT USED 18 MOUNT LIGHT FIXTURE WITHIN CANOPY 19 WALL MOUNTED LIGHT FIXTURE 20 NOT USED 21 DISPLAY POSTER PANEL AND SURROUND OF -E018 OF -E019 22 NOT USED 23 ENTRANCE DISPLAY HOURS PANEL <----OF-45 24 DRIVE-THRU WINDOW TREATMENT AND DISP ANEL 25 FEATURE WINDOW POP OUT W/ ALUMINUM BREAK METAL PANELS & ILLUMINATED UGHT BOX COLOR: A SHERWIN WILUAMS: SW 7015 "REPOSE GRAY" B SHERWIN WILLIAMS: SW 6321 "RED BAY" C STANDARD STOREFRONT: CLEAR ANODIZED D WHITE TEXT ON RED BACKGROUND E CLEAR ANODIZED F COLOR/FINISH TO MATCH ADJACENT SURFACE G SHERWIN WILLIAMS: SW 6990 "CAVIAR" H POWDERCOATED ANODIZED SILVER J MARC, AV294 K SHERWIN WILLIAMS: SW 7020 "BLACK FOX" L NATURAL CONCRETE, GRAY M STAINLESS STEEL N SHERWIN WILLIAMS: SW 7018 "DOVETAIL" 0 NOT USED P PAINT TO MATCH CLEAR ANODIZED ALUMINUM, TIGER DRYLAC 38/91020 R PRE -FINISHED "DARK BRONZE". GENERAL NOTES: 1. ALL SIGNAGE IS UNDER SEPARATE SUBMITTAL AND PERMIT (N.I.C.). 2. C.J. = PLASTER CONTROL JOINT 3. ALL PLASTER ACCESSORIES, FLASHINGS ETC. SHALL BE PAINTED TO MATCH ADJACENT SURFACES. (U.O.N.), 4. ALL EXTERIOR WALL OPENINGS FOR RECEPTACLES, HOSE BIBBS, ETC. SHALL BE SEALED. SEE FLOOR PLAN, GENERAL NOTES, AND SPECIFICATIONS FOR ADDITIONAL NOTES. in the box 9330 BALBOA AVENUE SAN DIEGO, CA 92123 ® 2007 Jack in the BDx Inc. Throe dedpa4 drvNnpe and giedficWme are the prapwty d Jack Ia the Boa Inc andshall not be tV'l ar repr"da d "ith.t Its P-1— written -L These &.*,p dbdmd — ht.W to —W the .MH d h PRohp it - W =A e- dnmwte p Wd.d the adl Im does wl _w mth Nw 9— g otddI b h B" dot, dmm U. -,k Is b h pcko i Tm eH -d b Ee nvdrd b o.#, dN d wpkw. w . wd eHe-pedik mndu.. DATES RELEASE: AUG. 24, 2015 P.M. UPDATES: SEPT. 22, 2016 SUBMITTAL DATE 1: 2: 3: BID: CONSTRUCTION: REVISIONS p fmmmh iml Romig and PHP ft 5/4AI 0 W_m fon Rmrd9 and Pt& W* 7n2AI 1 aStD ARCy/J �Oy �Ot 04 REN.1/31/19 ✓'q JF OF CAUFO�?P DESIGN XiYCE€[tE0tDr1I Solutions Group 6930 DESTINY DRIVE SUITE 100 ROCKLIN, CA 95677 19161 4155358 'Pedr0iP dgm" ,m ROY W. Pe 1, A -1-t SITE INFORMATION MK TYPE: MK5F_48 JIB #: 0490 ADDRESS: 1451 S. DE ANZA BLVD CUPERTINO, CA 95014 DRAWN BY: PROJECT #: JRG17001.0 SCALE AS NOTED EXTERIOR ELEVATIONS A4.1