HomeMy WebLinkAboutAH Packet 1-11-2018CITY OF CUPERTINO
AGENDA
ADMINISTRATIVE HEARING
5:00 PM
10300 Torre Avenue, City Hall Conference Room C
Thursday, January 11, 2018
ROLL CALL
APPROVAL OF MINUTES
1.Subject: Draft Minutes of December 14, 2017
Recommended Action: Approve or modify the Draft Minutes of December 14, 2017
Draft Minutes of December 14, 2017
WRITTEN COMMUNICATIONS
ORAL COMMUNICATIONS
This portion of the meeting is reserved for persons wishing to address the members on
any matter not on the agenda. Speakers are limited to three (3) minutes. In most cases,
State law will prohibit the members from making any decisions with respect to a matter
not listed on the agenda
PUBLIC HEARINGS
2.Subject: Front Yard Interpretation to designate the property line along S. Stelling
Road as the front lot line and to permit a 1,551 square foot addition to the existing
single-story, single-family residence. Application No(s).: INT-2017-01 ;
Applicant(s): Nallely Garcia (Vasavakul residence); Location: 1258 S Stelling Road
APN# 366-11-109
Recommended Action: That the Hearing Officer:
1 - Find that the project is exempt from CEQA; and
2 - Approve the Front Yard Interpretation and proposed addition per the Draft
Resolution
Staff Report
1 - Draft Resolution
2 - Plan Set
OLD BUSINESS
Page 1
January 11, 2018Administrative Hearing AGENDA
NEW BUSINESS
ADJOURNMENT
In compliance with the Americans with Disabilities Act (ADA), anyone who is planning
to attend the next meeting who is visually or hearing impaired or has any disability
that needs special assistance should call the City Clerk's Office at 408-777-3223, 48
hours in advance of the meeting to arrange for assistance. Upon request, in advance,
by a person with a disability, meeting agendas and writings distributed for the meeting
that are public records will be made available in the appropriate alternative format.
Also upon request, in advance, an assistive listening device can be made available for
use during the meeting.
Any writings or documents provided to a majority of the members after publication of
the agenda will be made available for public inspection. Please contact the City
Clerk’s Office in City Hall located at 10300 Torre Avenue during normal business
hours.
IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal
Code 2.08.100 written communications sent to the Cupertino City Council,
Commissioners or City staff concerning a matter on the agenda are included as
supplemental material to the agendized item. These written communications are
accessible to the public through the City’s website and kept in packet archives. You are
hereby admonished not to include any personal or private information in written
communications to the City that you do not wish to make public; doing so shall
constitute a waiver of any privacy rights you may have on the information provided to
the City.
Members of the public are entitled to address the members concerning any item that is
described in the notice or agenda for this meeting, before or during consideration of
that item. If you wish to address the members on any other item not on the agenda, you
may do so during the public comment.
Page 2
Cupertino, CA 95014
(408) 777-3308
ACTION MINUTES OF THE REGULAR MEETING OF
THE ADMINISTRATIVE HEARING HELD ON December 14, 2017
ROLL CALL
Hearing Officer present: Benjamin Fu, Assist. Director of Community Development
Staff present: Gian Paolo Martire, Associate Planner
Applicant(s) present: Thomas Adamo, property owner
APPROVAL OF MINUTES:
1.October 26, 2017
The minutes of October 26, 2017 were approved as written
POSTPONEMENTS/REMOVAL FROM CALENDAR:
None
ORAL COMMUNICATIONS:
None
WRITTEN COMMUNICATIONS:
None
PUBLIC MEETING ITEMS:
2. Application No.(s): TM-2016-02 (EA-2017-03)
Applicant:Thomas Adamo (Lands of Adamo)
Location: 10206 & 10208 Orange Ave APN# 357-18-032
Tentative Map application to allow the subdivision of an approximately .29 acre lot into two (2) equal
parcels of approximately 6,000 square feet; a Mitigated Negative Declaration
Administrative Hearing decision final unless appealed.
2 Administrative Hearing
December 14, 2017
Staff Member Martire addressed the Hearing Officer. The lot in question is in an older part of
the City, but the proposed lot split conforms to the lot size of the surrounding parcels In
researching the project, Staff was unable to find proper documentation for one of the current
addresses on site. He stressed that this did not mean that the construction was illegal, but that
more clarification was necessary. The applicant has submitted conceptual renderings showing
future two-story residences on the lots. The homes very loosely evaluated for conformance to
the current R1-5 Design guidelines, however, this is not part of the application under
discussion today. The Environmental review Committee reviewed the application at its
November 16th meeting and recommended approval of the Mitigated Negative Declaration.
During construction, the site will have the top 6 inches of soil removed to mitigate any hazards
for residual pesticides or other chemicals. The Public Works Department will require
sidewalks to be installed as part of the City’s sponsored “Safe Walks to School Program” once
the new homes are in the construction phase.
The Hearing Officer asked for clarification about the 40’ lot sizes (where 60’ is standard). Staff
member Martire explained how the Planned Development Zoning is flexible so to
accommodate for unique or substandard lot when it is called for to achieve conformity in the
neighborhood.
The applicant spoke to the Hearing Officer. He asked if the non-conforming structures on site
needed to be demolished now or could wait until there was a buyer for the lot. The Hearing
Officer said that the structures would need to be demolished anyway, so it made no difference
on the decision of the lot split.
The Hearing Officer opened the public comment period.
As there we no speakers, the Hearing Officer close the comment period.
The Hearing Officer liked the project and thought that the new homes would be a good
addition to the housing needs of the City.
DECISION: The applications were approved by the Hearing Officer per the draft resolutions.
ADJOURNMENT
Respectfully submitted:
_____/s/Beth Ebben
Beth Ebben
Administrative Assistant
g:planning/AH Committee/Minutes121417
ADMINISTRATIVE HEARING STAFF REPORT
Agenda Date: January 11, 2018
SUBJECT
Front Yard Interpretation to designate the property line along S. Stelling Road as the
front lot line and to permit a 1,551 square foot addition to an existing single-story,
single-family residence located at 1258 S. Stelling Road. Application: INT-2017-01;
Applicant: Nallely Garcia, GP Residential Designs; Project Location: 1258 S. Stelling
Road A.P.N.: 366-11-109
RECOMMENDED ACTION
That the Hearing Officer:
1. Find that the proposed actions are exempt from CEQA; and
2. Approve the Front Yard Interpretation and proposed addition per the Draft
Resolution
DISCUSSION
Project Data:
Special Area/Neighborhood South Monta Vista Neighborhood
General Plan Designation Low Density Residential (1-5 DU/Acre)
Zoning Designation R1-6 (Single-Family Residential)
Allowed/Required Existing Proposed
Lot Size 9,276 sq. ft. (0.21 acres)
Lot Coverage 50% 22% 39%
Proposed Size 4,174 sq. ft. 1,666 sq. ft. 3,614 sq. ft.
F.A.R. 45% 18% 39%
1st Floor Setbacks
Front 20’ 25’-5” 21’-1”
Rear 20’ 15’-5” 25’-8”
Street Side 12’ 22’-10” 17’-1”
Interior Side 5’ 25’-8” 11’-0”
COMMUNITY DEVELOPMENT DEPARTMENT
PLANNING DIVISION
CITY HALL
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3308 • FAX (408) 777-3333
INT-2017-01 1258 S. Stelling Rd. January 11, 2018
S. STELLING ROAD Total Building Height 28’ 13’-7” 20’
Project Consistency With:
General Plan Yes
Zoning Yes (upon approval of the Front Yard Interpretation)
Environmental Review Categorically Exempt per Section 15301 of the
California Environmental Quality Act (CEQA)
Background:
Proposed Project:
The applicant, Nallely Garcia (GP Residential Designs), representing the property
owners, Thaveesinn and Thitiporn Vasavakul, is proposing a 1,551 square foot addition
to an existing single-story, single-family residence located on a corner lot. As part of the
project proposal, the applicant is requesting a Front Yard Interpretation to establish S.
Stelling Road as the front lot line of this corner lot.
Site Description:
The property is
located at the
northwest corner of S.
Stelling Road and
Rainbow Drive in the
Monta Vista South
neighborhood (Figure
1). The existing 1,666
square foot single-
story home is located
in a residential zoning
district and is
surrounded on all
sides by single-family
residences.
The lot was created as a result of a subdivision developed in 1961 in the City of San
Jose. The recorded tract map indicates a 20-foot building setback line along the S.
Stelling Road frontage for the lot and a 12.5-foot building setback line along the
Rainbow Drive frontage. Subsequently, the property was annexed to the City of
Cupertino in 1982. As a result of annexation, the property became subject to Cupertino’s
Municipal Code and regulations. Chapter 19.08 of the Municipal Code defines the front
lot line on a corner lot as the shorter lot line abutting a street. For the subject property,
Figure 1: Aerial
INT-2017-01 1258 S. Stelling Rd. January 11, 2018
Figure 2: Neighborhood pattern
the lot line on Rainbow Drive measures 76.98 feet and the lot line on S. Stelling Road
measures 84.31 feet. Therefore, in accordance with the City’s Municipal Code, Rainbow
Drive is considered the front lot line.
While the proposed addition is consistent with original subdivision, it is not consistent
with the City’s current Zoning ordinance. However, the Municipal Code recognizes that
in certain cases, the definition of the front lot line may be modified, particularly when it
improves the design relationship of the proposed buildings/additions to adjacent
buildings and development, upon review and approval by the City. Therefore, the
applicant has applied for a front yard interpretation.
Analysis:
The proposed project is consistent with the General Plan. It is also consistent with the
Single-Family Residential (R1) Ordinance of the Cupertino Municipal Code in all
respects, should a Front Yard Interpretation be approved.
Setback requirements are intended to establish a consistent pattern of development and
to improve the interface between the street and building frontage. The existing lot
pattern in the neighborhood has the lot on the corner of Rainbow Drive and Aster Lane
fronting Aster Lane and not Rainbow Drive. The property is graded to be more level
with S. Stelling Rd and is raised a few feet higher than Rainbow Drive. Furthermore,
designating the property line along S. Stelling Road as the front lot line would eliminate
the non-conforming status of the existing rear yard setback per the Cupertino Municipal
Code. Currently, under the Municipal Code, the
existing rear setback for the property is 15’-5”,
where a 20’ minimum is required.
A Front Yard Interpretation to designate the
property line along S. Stelling Road as the front lot
line does the following:
1. Reinforce the residential building relationship as
established by the original development of this
subdivision in San Jose;
2. Eliminate the non-conforming status of the
existing residence due to the existing rear yard
setback encroachment per Cupertino regulations;
3. Maintain the frontage orientation of the
surrounding properties (Figure 2); and
4. Improve the relationship of existing residences
and future developments.
INT-2017-01 1258 S. Stelling Rd. January 11, 2018
Environmental Review
This project is categorically exempt from the requirements of the California
Environmental Quality Act (CEQA) per Section 15301 – Existing Facilities because the
exemption applies to the existing single-family residence.
PUBLIC NOTICING AND COMMUNITY OUTREACH
The following table is a brief summary of the noticing done for this project:
Notice of Public Meeting & Site Signage Agenda
• Site Signage (10 days prior to hearing)
• 9 notices mailed to property owners
adjacent to the project site (10 days
prior to hearing)
• Posted on the City's official notice
bulletin board (one week prior to hearing)
• Posted on the City of Cupertino’s Web
site (one week prior to hearing)
No public comments were received at the time of production of this staff report.
PERMIT STREAMLINING ACT
This matter is adjudicatory and is subject to the Permit Streamlining Act (Government
Code Section 65920 – 65964). The City has complied with the deadlines found in the
Permit Streamlining Act.
Project Received: November 22, 2017; Deemed Incomplete: November 29, 2017
Project Resubmitted: December 5, 2017; Deemed Incomplete: December 7, 2017
Project Resubmitted: December 7, 2017; Deemed Complete: December 19, 2017
The City has 60 days (until February 17, 2018) to make a decision on the project.
CONCLUSION
Approval of the Front Yard Interpretation is recommneded since it will improve the
design relationship of the proposed residential addition to adjacent residences.
Additionally, all of the findings for approval of the proposed project, consistent with
the Cupertino Municipal Code, may be made as reflected in the Draft Resolutions.
NEXT STEPS
The permit will be effective 14 calendar days from the date of the hearing. The decision
of the Administrative Hearing Officer is final, unless appealed within 14 calendar days
from the date of the hearing. The applicant may apply for building and/or other permits
with the City at the end of the appeal period. This approval is valid until January 11,
2019. The applicant may apply for a one-time one year extension before the approval
expires.
INT-2017-01 1258 S. Stelling Rd. January 11, 2018
Prepared by: Erika Poveda, Assistant Planner
Reviewed and Approved by: Piu Ghosh, Principal Planner
ATTACHMENTS
1. Draft Resolution
2. Plan Set
INT-2017-01
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
DRAFT RESOLUTION
OF THE ADMINISTRATIVE HEARING OFFICER
OF THE CITY OF CUPERTINO TO ALLOW A FRONT YARD INTERPRETATION
TO DESIGNATE THE PROPERTY LINE ALONG S. STELLING ROAD AS THE
FRONT LOT LINE AND TO PERMIT A 1,551 SQUARE FOOT ADDITION TO THE
EXISTING SINGLE-STORY, SINGLE-FAMILYRESIDENCE LOCATED AT 1258 S.
STELLING ROAD (A.P.N 366-11-109).
SECTION I: PROJECT DESCRIPTION
Application No.:INT-2017-01
Applicant:Nallely Garcia (GP Residential Designs)
Location:1258 S. Stelling Road (A.P.N. 366-11-109)
SECTION II: FINDINGS
WHEREAS, the City of Cupertino received an application for a Front Yard
Interpretation to designate the property line along S. Stelling Road as the front lot line
and to permit a 1,551 square foot addition to the existing single-story, single-family
residence; and
WHEREAS, the project is categorically exempt from the California Environmental
Quality Act (CEQA);
WHEREAS, the necessary public notices have been given as required by the Procedural
Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at
least one public meeting in regard to the application; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, the Administrative Hearing Officer finds that:
1. The project is consistent with the Cupertino General Plan, any applicable specific
plans, zoning ordinance, and the purposes of the R1 Ordinance; and
The proposed project is consistent with the existing residential land use designations
surrounding the site and is consistent with Title 19, Zoning, and Chapter 19.28, Single-
Family Residential (R1) Ordinance, of the Cupertino Municipal Code for setbacks, lot
coverage, floor area ratio, and other development standards.
Draft Resolution INT-2017-01 January 11, 2018
Page 2
2. The proposed project is harmonious in scale and design with the general
neighborhood; and
The interpretation will reinforce the existing residential building relationship as established
by the original development when the property was in the City of San Jose, eliminate the
non-conforming status of the existing residence under the Cupertino Municipal Code,
maintain the frontage orientation of the subject site and surrounding properties, and improve
the relationship of existing residences and future developments.
3. The granting of the permit will not result in a condition that is detrimental or
injurious to property or improvements in the vicinity, and will not be detrimental to
the public health, safety, or welfare.
No changes to site access are proposed. The driveway continues to be located farthest from the
intersection of S. Stelling Road and Rainbow Drive. The property is graded to be level to
Stelling Road but is higher than Rainbow Drive. Therefore, there is no change or impact to
the surrounding neighborhood due to access to and from the site. The proposed project meets
all required setbacks of the R1 zoning district and the Zoning Title. Therefore, the proposed
project will not be detrimental or injurious to property or improvements in the vicinity, and
will not be detrimental to the public health, safety, or welfare.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony, and other evidence
submitted in this matter, the Hearing Officer of the Administrative Hearing does
determine that, Application No. INT-2017-01, is categorically exempt from CEQA; and
approves said application; and
That the subconclusions upon which the findings and conditions specified in Section III
of this Resolution are based and contained in the public meeting record concerning
Application No. INT-2017-01 as set forth in the Minutes of the Administrative Hearing
Meeting of January 11, 2018, and are incorporated by reference herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the plan set entitled, “Sinn Residence: Proposed Addition &
Remodel, 1258 S. Stelling Rd., Cupertino, CA 95014,” drawn by GP Residential
Designs dated September 21, 2017 consisting of nine (9) sheets labeled A1 through
A8; and the boundary and topographic map entitled, “Preliminary Boundary and
Topographic Map Lands of Vasavakul” certified by Porfirio Oscar Osuna dated
November 17, 2017 consisting of two (2) sheets; except as may be amended by
conditions in this resolution.
Draft Resolution INT-2017-01 January 11, 2018
Page 3
2. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the
building plans.
3. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks,
property size, building square footage, any relevant easements, and/or construction
records. Any misrepresentation of any property data may invalidate this approval
and may require additional review.
4. COMPLIANCE WITH PUBLIC WORKS CONFIRMATION FORM
The project shall comply with the requirements indicated on the Public Works
Confirmation form including, but not limited to, dedications, easements, off-site
improvements, undergrounding of utilities, all necessary agreements, and utility
installations/relocations as deemed necessary by the Director of Public Works and
required for public health and safety. The Public Works Confirmation is a
preliminary review, and is not an exhaustive review of the subject development.
Additional requirements may be established and implemented during the
construction permitting process. The project construction plans shall address these
requirements with the construction permit submittal, and all required
improvements shall be completed to the satisfaction of the Director of Public Works
prior to final occupancy.
5. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
6. FRONT YARD INTERPRETATION
An Interpretation is granted to allow the lot line adjoining S. Stelling Road to be
considered the front lot line. Any future additions or modifications to the residence
shall be consistent with the interpretation of the lot line adjoining S. Stelling Road as
the front lot line.
7. FENCES
The location of all fences on the site shall be indicated on building permit plans,
comply with Chapter 19.48, Fences, of the Cupertino Municipal Code and must be
reviewed and approved prior to issuance of building permits. The setback
Draft Resolution INT-2017-01 January 11, 2018
Page 4
requirements for all fences shall be consistent with the interpretation designating the
front lot line as S. Stelling Road and the street-side lot line as Rainbow Drive.
8. ACCESORY BUILDINGS/STRUCTURES
The location of all existing and proposed accessory buildings and/or structures shall
be indicated on building permit plans and shall comply with Chapter 19.100,
Accessory Buildings/Structures, of the Cupertino Municipal Code for review and
approval prior to issuance of building permits.
9. DEMOLITION REQUIREMENTS
All demolished building and site materials shall be recycled to the maximum extent
feasible subject to the Building Official. The applicant shall provide evidence that
materials were recycled prior to issuance of final demolition permits.
10. DUST CONTROL
The following construction practices shall be implemented during all phases of
construction for the proposed project to prevent visible dust emissions from leaving
the site:
a. Water all active construction areas at least twice daily and more often during
windy periods to prevent visible dust from leaving the site; active areas adjacent
to windy periods; active areas adjacent to existing land uses shall be kept damp
at all times, or shall be treated with non-toxic stabilizers or dust palliatives.
b. Cover all trucks hauling soil, sand, and other loose materials or require all trucks
to maintain at least 2 feet of freeboard;
c. Pave, apply water at least three times daily, or apply (non-toxic) soil stabilizers
on all unpaved access roads, parking areas and staging areas at construction
sites.
d. Sweep streets daily, or more often if necessary (preferably with water sweepers)
if visible soil material is carried onto adjacent public streets.
e. The applicant shall incorporate the City’s construction best management
practices into the building permit plan set.
11. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS
a. All grading activities shall be limited to the dry season (April 15 to October 1),
unless permitted otherwise by the Director of Public works.
b. Construction hours and noise limits shall be compliant with all requirements of
Chapter 10.48 of the Cupertino Municipal Code.
c. Grading, street construction, underground utility and demolition hours for work
done more than 750 feet away from residential areas shall be limited to Monday
through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m.
Draft Resolution INT-2017-01 January 11, 2018
Page 5
Grading, street construction, demolition or underground utility work within 750
feet of residential areas shall not occur on Saturdays, Sundays, holidays, and
during the nighttime period as defined in Section 10.48.053(b) of the Municipal
Code.
d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8
p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not
allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night
time construction is allowed if compliant with nighttime standards of Section
10.48 of the Cupertino Municipal Code.
e. Rules and regulations pertaining to all construction activities and limitations
identified in this permit, along with the name and telephone number of an
applicant appointed disturbance coordinator, shall be posted in a prominent
location at the entrance to the job site.
f. The applicant shall be responsible for educating all contractors and
subcontractors of said construction restrictions.
The applicant shall comply with the above grading and construction hours and
noise limit requirements unless otherwise indicated
12. EXTERIOR BUILDING MATERIALS/TREATMENTS
The final building exterior plan shall closely resemble the details shown on the
original approved plans. Final building exterior treatment plan (including but not
limited to details on exterior color, materials, architectural treatments, doors,
windows, lighting fixtures, and/or embellishments) shall be reviewed and approved
by the Director of Community Development prior to issuance of building permits to
ensure quality and consistency. Any exterior changes determined to be substantial
by the Director of Community Development shall either require a modification to
this permit or a new permit based on the extent of the change.
13. LANDSCAPE PROJECT SUBMITTAL
Prior to issuance of building permits, the applicant shall submit a full Landscape
Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape
Ordinance, for projects with landscape area 500 square feet or more or elect to
submit a Prescriptive Compliance Application per sections 14.15.040 A, B, and C for
projects with landscape area between 500 square feet and 2,500 square feet.The
Landscape Documentation Package or Prescriptive Compliance Application shall be
reviewed and approved to the satisfaction of the Director of Community
Development prior to issuance of building permits, and additional requirements per
sections 14.15.040 D, E, F, and G or 14.15.050 E, F, G, H, and I will be required to be
reviewed and approved prior to final inspections.
Draft Resolution INT-2017-01 January 11, 2018
Page 6
14. INDEMNIFICATION
Except as otherwise prohibited by law, the applicant shall indemnify and hold
harmless the City, its City Council, and its officers, employees and agents
(collectively, the “indemnified parties”) from and against any claim, action, or
proceeding brought by a third party against one or more of the indemnified parties
or one or more of the indemnified parties and the applicant to attack, set aside, or
void this Resolution or any permit or approval authorized hereby for the project,
including (without limitation) reimbursing the City its actual attorneys’ fees and
costs incurred in defense of the litigation. The applicant shall pay such attorneys’
fees and costs within 30 days following receipt of invoices from City. Such attorneys’
fees and costs shall include amounts paid to counsel not otherwise employed as City
staff and shall include City Attorney time and overhead costs and other City staff
overhead costs and any costs directly related to the litigation reasonably incurred by
City.
15. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant to
Government Code Section 66020(d) (1), these Conditions constitute written notice of
a statement of the amount of such fees, and a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90-day
approval period in which you may protest these fees, dedications, reservations, and
other exactions, pursuant to Government Code Section 66020(a), has begun. If you
fail to file a protest within this 90-day period complying with all of the requirements
of Section 66020, you will be legally barred from later challenging such exactions.
PASSED AND ADOPTED this 11th day of January, 2018 at a noticed Public Meeting of
the Administrative Hearing Officer of the City of Cupertino, State of California, held by
the Director of Community Development, or his or her designee, pursuant to Cupertino
Municipal Code Section 19.12.120.
ATTEST:APPROVED:
Erika Poveda Benjamin Fu
Assistant Planner Asst. Director of Community Development
1GPRESIDENTIALDESIGNS829 S. 7th Street San Jose, CA 95112Phone: (408) 292-3800 (408) 274-3069gpresidential@gmail.com190'4A 0'9#&&+6+10241215'&%72'46+01%#556'..+0)4&5+004'5+&'0%'
GFTKXGYC[
#
UKPINGUVQT[CFFKVKQPCPFOCLQTTGOQFGNYKVJ
PGYTQQHHTCOKPIU[UVGO
241,'%6#
5%12'1(914-
CRPÄÄ
QEEWRCPE[ITQWRTÄW
EQPUVTWEVKQPV[RGXÄD
\QPKPITÄÄ
NCPFWUGTGUNQYÄ
TQQHRNCP
&4#9+0)+0&':
#
#
UKVGRNCP
HNQQTCTGCECNEWNCVKQPFKCITCO
#RTQRQUGFHNQQTRNCP
#ETQUUUGEVKQP
5%#.'Ä
5+6'2.#0
556'..+0)4&
SINN RESIDENCE
PROPOSED ADDITION & REMODEL
1258 S. STELLING RD. CUPERTINO, CA 95014
NQVUK\GUSHV
GZKUVKPIFYGNNKPI
RTQRQUGFCFFKVKQPUSHV
GZKUVKPIICTCIG
RTQRQUGFCFFKVKQPUSHV
RTQRQUGFRQTEJUSHV
QXGTJCPIUUSHV
VQVCNNQVEQXGTCIGUSHV
.16%18'4#)'
FYGNNKPIUSHV
ICTCIGUSHV
QXGTJGKIJVCTGCUSHV
RCTVKCNEQXGTGFRQTEJUSHV
VQVCNCTGCUSHV
VQVCNCTGC NQVUK\G
(#4
VQVCNHQQVRTKPV
YQXGTJCPIU
GZKUVKPIFYGNNKPIUSHV
RTQRQUGFPGYCFFKVKQPUSHV
GZKUVKPIICTCIGUSHV
RTQRQUGFPGYICTCIGGZRCPUKQPUSHV
RTQRQUGFPGYHTQPVRQTEJUSHV
VQVCNNKXKPICTGC
USHV
#4'#%#.%7.#6+10
#HTQPV TGCTGNGXCVKQP
#NGHV TKIJVGNGXCVKQP
GZKUVKPIHNQQTRNCP4#+0$19&4ÄYEG
ÄRUG
Ä
Ä
Ä
Ä
DWKNFKPIUGVDCEMNKPG
ÄDWKNFKPIUGVDCEMNKPG
UKFGYCNM
RNCPVGTUVTKRUKFGYCNMRNCPVGTUVTKRRTQRGTV[NKPG
RTQRQUGFPGYICTCIG
GZRCPUKQPUSHV
RTQRQUGFPGYCFFKVKQP
USHV
RTQRQUGFPGYCFFKVKQP
USHV
RTQRQUGFPGYRQTEJ
USHV
GFYGNNKPI
TCKUGGZKUVKPIRNCVGJGKIJVVQHGGV
GZKUVKPINCPFUECRKPIVQTGOCKP
GHQQVJKIJ
TGFYQQFHGPEKPI
#GZKUVKPIGNGXCVKQPU
#PGKIJDQTKPIRTQRGTVKGU
ÄÄ
Ä
Ä
ÄOKP
RTQXKFG
PJGKIJV
HGPEGÄOKPHTQO
RTQRGTV[NKPG
Ä
Z
USHV
QXGTKPJGKIJV
Ä
Ä
USHVHTQPV[CTFCTGC
QHKORGTXKQWUCNNQYGF
USHV
RTQRQUGFPGYKORGTXKQWUCTGCUSHV
OWNVKVTWPMVTGG
RKPGVTGG
VTGG
RKPGVTGG
VTGG
U[ECOQTGVTGG
TGFYQQFVTGG
VQDGTGOQXGF
Ä
1.1GPRESIDENTIALDESIGNS829 S. 7th Street San Jose, CA 95112Phone: (408) 292-3800 (408) 274-3069gpresidential@gmail.com190'4A 0'9#&&+6+10241215'&%72'46+01%#556'..+0)4&5+004'5+&'0%'0'+)*$14+0)2412'46+'5
5%#.'
Ä
Ä
&9'..+0)
&9'..+0)
Ä
2GPRESIDENTIALDESIGNS829 S. 7th Street San Jose, CA 95112Phone: (408) 292-3800 (408) 274-3069gpresidential@gmail.com190'4A 0'9#&&+6+10241215'&%72'46+01%#556'..+0)4&5+004'5+&'0%'UGEVKQP
C
D
E
G
H
I
J
FKOGPUKQPU
ÄZÄ
ÄZÄ
ÄZÄ
ÄZÄ
ÄZÄ
ÄZÄ
Ä:Ä
Ä:ÄUSHV
CTGC
USHV
USHV
USHV
USHV
USHV
USHV
USHV
VQVCNHNQQTCTGCUSHV
(.114#4'#%#.%7.#6+10&+#)4#/
#
F
$
%
&'(
)
':+56+0)&'/1.+6+10(.1142.#0
5%#.'Ä
5%#.'Ä
DFTODFTO
DFTO
HCOKN[TO
MKVEJGP
ICTCIG
GZKUVKPIYCNNVQTGOCKP
9#...')'0&
FGOQGZKUVKPIYCNN
*
3GPRESIDENTIALDESIGNS829 S. 7th Street San Jose, CA 95112Phone: (408) 292-3800 (408) 274-3069gpresidential@gmail.com190'4A 0'9#&&+6+10241215'&%72'46+01%#556'..+0)4&5+004'5+&'0%'GZKUVKPIYCNNVQTGOCKP
RTQRQUGFPGYYCNN
YZFHUVWFU
"QEV[R
9#...')'0&
FGOQGZKUVKPIYCNN
/#56'4
$&4/
241215'&(.1142.#0
5%#.'Ä
Ä
Ä
ÄÄ
Ä
Ä
Ä
Ä
Ä
Ä
Ä
Ä
Ä
Ä
Ä
Ä
ZKUNCPF
QXGPTGH
Ä
ÄÄ
Ä
Ä
Ä
Ä
Ä
Ä
Ä
Ä
Ä
Ä
Ä
$&4/
1((+%'
$&4/
$&4/
(1;'4 Ä%#4
)#4#)'
&+0+0)
4/
)4'#6
4/
Ä
Ä
Ä
Ä
Ä
Ä
-+6%*'0
#
214%*
UVGR#
Ä
ÄÄ
Ä
4GPRESIDENTIALDESIGNS829 S. 7th Street San Jose, CA 95112Phone: (408) 292-3800 (408) 274-3069gpresidential@gmail.com190'4A 0'9#&&+6+10241215'&%72'46+01%#556'..+0)4&5+004'5+&'0%'#
411(2.#0
5%#.'Ä
PTQQHVTWUUGU
#
5GPRESIDENTIALDESIGNS829 S. 7th Street San Jose, CA 95112Phone: (408) 292-3800 (408) 274-3069gpresidential@gmail.com190'4A 0'9#&&+6+10241215'&%72'46+01%#556'..+0)4&5+004'5+&'0%'%41555'%6+10
5%#.'Ä#
PCVWTCNITCFG
Ä%#4
)#4#)'
)4'#6
4/-+6%*'0
Ä
PTQQHVTWUUGU
214%*
Ä
Ä
Ä
CVVKEUJCNNPQVDGWUGFCUJCDKVCDNGURCEG
%41555'%6+10
5%#.'Ä#
PTQQHVTWUUGU
CVVKEUJCNNPQVDGWUGFCUJCDKVCDNGURCEG
/#56'4
$&4/
9#.-Ä+0
%.15'6
*#..9#;$#6*411/$&4/
DC[YKPFQY
Ä
6
241215'&(4106'.'8#6+10
9'56
5%#.'Ä
Ä
RNCVGJV
TQQHVKNG
4'#4'.'8#6+10
'#56
5%#.'ÄGPRESIDENTIALDESIGNS829 S. 7th Street San Jose, CA 95112Phone: (408) 292-3800 (408) 274-3069gpresidential@gmail.com190'4A 0'9#&&+6+10241215'&%72'46+01%#556'..+0)4&5+004'5+&'0%'NKIJVYGKIJV
UVQPGXGPGGT
NKIJVYGKIJV
UVQPGXGPGGT
UKFKPI
UKFKPI
TQQHVKNG
Ä
RTQRGTV[NKPGRTQRGTV[NKPGÄ
HH
PCVWTCNITCFG
PCVWTCNITCFG
Ä
OCZJV
Ä
Ä
RNGCUGPQVG
CP[EJCPIGUVQVJGCRRTQXGFEQNQTUOCVGTKCNU
CPFGZVGTKQTHKPKUJGUUJCNNDGTGXKGYGFCPF
CRRTQXGFD[VJGEKV[QHEWRGTVKPQRNCPPKPI
FKXKUKQPRTKQTVQKPUVCNNCVKQPCRRNKECVKQP
VJKUCTGCQXGTÄKPJGKIJV
KUFQWDNGEQWPVGFKPHCT
VJKUCTGCQXGTÄKPJGKIJV
KUFQWDNGEQWPVGFKPHCT
Ä
Ä
Ä
7
.'(65+&''.'8#6+10
0146*
5%#.'Ä
4+)*65+&''.'8#6+10
5176*
5%#.'ÄGPRESIDENTIALDESIGNS829 S. 7th Street San Jose, CA 95112Phone: (408) 292-3800 (408) 274-3069gpresidential@gmail.com190'4A 0'9#&&+6+10241215'&%72'46+01%#556'..+0)4&5+004'5+&'0%'NKIJVYGKIJV
UVQPGXGPGGT
ECPVKNGXGTGFDC[YKPFQY
ECPVKNGXGTGFDC[YKPFQY
UKFKPIUKFKPI UKFKPIUKFKPI
UKFKPIUKFKPIUKFKPIUKFKPI
TQQHVKNG
TQQHVKNG
HH
TQQHVKNG
PCVWTCNITCFG
Ä
ÄÄ
RNGCUGPQVG
CP[EJCPIGUVQVJGCRRTQXGFEQNQTUOCVGTKCNU
CPFGZVGTKQTHKPKUJGUUJCNNDGTGXKGYGFCPF
CRRTQXGFD[VJGEKV[QHEWRGTVKPQRNCPPKPI
FKXKUKQPRTKQTVQKPUVCNNCVKQPCRRNKECVKQP
VJKUCTGCQXGTÄKPJGKIJV
KUFQWDNGEQWPVGFKPHCT
VJKUCTGCQXGTÄKPJGKIJV
KUFQWDNGEQWPVGFKPHCT
Ä
Ä
Ä
8GPRESIDENTIALDESIGNS829 S. 7th Street San Jose, CA 95112Phone: (408) 292-3800 (408) 274-3069gpresidential@gmail.com190'4A 0'9#&&+6+10241215'&%72'46+01%#556'..+0)4&5+004'5+&'0%'':+56+0)4'#4'.'8#6+10
'#56
5%#.'Ä
':+56+0)(4106'.'8#6+10
9'56
5%#.'Ä
':+56+0)4+)*65+&''.'8#6+10
5176*
5%#.'Ä
':+56+0).'(65+&''.'8#6+10
0146*
5%#.'Ä
Ä
RNCVGJV
Ä
Ä
EQORUJKPINGU
EQORUJKPINGU
EQORUJKPINGU
UKFKPIUKFKPI UKFKPI
UKFKPI
UKFKPI
Ä
Ä
RNCVGJV
Ä
Ä
Ä
Ä
RNCVGJVÄ
RNCVGJV
Ä
Ä
VQRTQRGTV[NKPG
Ä
VQRTQRGTV[NKPG
Ä
Ä