Loading...
HomeMy WebLinkAboutAH Summary 12-14-2017OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE o CUPERTINO, CA 95014-3255 (408) 777-3308 o FAX (408) 777-3333 - planning(,@-cupertino.org To: Mayor and City Council Members Planning Commissioners From: Benjamin Fu, Assist. Director of Community Development Date: December 21, 201.7 Subj: REPORT OF ADMINISTRATIVE HEARING DECISION MADE December 14, 2017 Chapter 19.12.170 of the Cupertino Municipal code provides for Appeal of decisions made at an Administrative Hearing 1. Application TM -2016-02, EA -2017-03, Thomas Adamo (Lands of Adamo), 10206 & 12008 Orange Ave Description Tentative Map Application to subdivide an approximately .29 acre lot into two equal parcels .of approximately 6,000 sf. Action The application was approved at the Administrative Hearing. The approval is effective December 14, 2017. The fourteen -calendar day appeal will expire on December 28, 2017. Enclosures: Administrative Hearing Report of December 14, 2017 Resolution No(s) 84 & 85 Plan set OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE © CUPERTINO, CA 95014-3255 (408) 777-3308 o FAX (408) 777-3333 m planning@cupertino.or-g ADMINISTRATIVE VE HEARING STAFF REPORT Agenda Date: December 14, 2017 SUBJECT Mitigated Negative Declaration and Tentative Map application to allow the subdivision of an approximately .29 acre lot into two (2) parcels of approximately 6,000 square feet each; (Application No(s).: TM -2016-02 (EA -2017-03); Applicant(s): Thomas Adamo; Location: 10208 Orange Ave; APN(s): 357-18-032) RECOMMENDED ACTION That the Hearing Officer approve the resolutions to: 1. Adopt a Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program; and 2. Approve the Tentative Map application. DISCUSSION Pro¶ect Data: Monta Nista Village Special Area ]Fll a w'XResidential (4.4-7.7 DU/Ac.) em a£l { sig -�. m'tob,...wY P(Res 4.4-7.7) Residential with 4.4 7.7 units/acre) ®meg D�sIlgnatIl®n z t (Planned h's�'xIl�tlLIl Awsc 4 10 i'. R 4 tir DeraAtRUN 3�`= 6.89 DU/acre 7.40 DU/acre r F�� 12,960 feet square (0.29 acres) 3E€,. # 1�Tet`I[s®t`Area3� 12,000 square feet (0.27 acres) 0-21 f'a at ;�rin4 a to aa' m ..,i.3y`Y 6,000 square feet 2 e - 4 ti ,.. 6,000 square feet dh �2` tEK' 3 t fIl '3Y # he,::..d FY - i 'tAV ➢S P" 2 Yes GeneralPani s f f Zonuz Yes TM -2016-02, EA -2017-03 10208 Orange Avenue December 14, 2017 Paye 2 of 6 Background: Site Description The property owner and applicant, Thomas Adamo, is seeking to subdivide one single- family residential lot into two single-family residential lots (see plan set — attachment 4.) The 12,960 square foot property is located on the eastern side of ®range Avenue, at the intersection with Lomita Avenue. The neighboring uses are mostly single family residences, with two multi -family parcels adjacent to the site at its north- east and south-east corners. Analysis: Conformance with General Plan and Zoning The project is consistent with the General Plan and Zoning density allowing a maximum of two (2) dwelling units on the site based on its acreage. Development Allocation Since there is only one existing permitted residence on the property, the 'proposed subdivision will need a development allocation of one (1) unit from the Nlonta Nista Special Planning Area residential allocation. This will leave a balance of 48 units in this Planning Area. TM -2016-02, EA -2017-03 10208 Orange Avenue December 14, 2017 Page 3 of 6 Subdivision Design, & Street Improvements The project proposal will create two lots with frontage on Orange Avenue. The proposed lot widths of 48' feet which is less than the lot development standards of the Single Family (R1) ordinance minimum of 60' feet. However, as the parcel is within a Planned (P) zoning district and the proposed split is consistent with the existing lot width pattern of the surrounding neighborhood, flexibility is permitted to allow a narrower subdivision design. The two proposed lots are rectangular and identical size to each other. The lots shall at a minimum be 6,000 s.f. after the subdivision. The table below shows the lot size and widths of neighboring parcels within the same zoning district. Table 1: Lot size and width of neighboring parcels The proposed design is consistent and compatible with the surrounding neighborhood both in resulting size and width. The project is required to dedicate 10' of its existing frontage as right-of-way in order to accommodate required off-site improvements consisting of sidewalk, curb and gutter, and pavement work. The resulting dedication reduces the existing lot size from 12,960 square feet to 12,000 square feet. The off-street improvements will be completed as part of the City . of Cupertino's Orange & Byrne Sidewalk Improvement project and the applicant will not be required to pay for the improvements.. The City Council authorized the Sidewalk Improvement project as a result of the Safe Routes to School initiative. 5 v € s p5,MKJL 13 21791 Olive Ave 6,056 67 Feet 21795 Olive Ave 2,394 28 Feet 10228 Orange Ave 6,000 48 Feet 10218 Orange Ave 6,000 48 Feet 21762 Lomita Ave 6,980 73 Feet 21760 Lomita Ave 6,312 62 Feet 21751 Lomita Ave 5,054 43 Feet 21761 Lomita Ave 4,849 43 Feet 21771 Lomita Ave 5,024 43 Feet 10140 Orange Ave 5,696 43 Feet 10136 Orange Ave 5,696 43 Feet 10130 Orange Ave 5,177 40 Feet 10120 Orange 5,177 40 Feet The proposed design is consistent and compatible with the surrounding neighborhood both in resulting size and width. The project is required to dedicate 10' of its existing frontage as right-of-way in order to accommodate required off-site improvements consisting of sidewalk, curb and gutter, and pavement work. The resulting dedication reduces the existing lot size from 12,960 square feet to 12,000 square feet. The off-street improvements will be completed as part of the City . of Cupertino's Orange & Byrne Sidewalk Improvement project and the applicant will not be required to pay for the improvements.. The City Council authorized the Sidewalk Improvement project as a result of the Safe Routes to School initiative. TM -2016-02, EA -2017-03 10208 Orange Avenue December 14, 2017 Paae 4 of 6 Conceptual Two -Story Plans The applicant has submitted conceptual site plans and elevations demonstrating that the new lots can facilitate reasonable and compatible house designs (see Attachment 4.) The elevations, architectural details, and fagade treatment illustrated are intended to be representative of the future residences and are compatible with the existing neighborhood. The applicant/property owner is required to go through a separate design review process prior to the application for building permits and construction of the new homes. Environmental Review A Draft Initial Study and Mitigated Negative Declaration has been prepared for the project (see Attachment 3) The Mitigated Negative Declaration identifies mitigation measures in the following areas, which have been added as conditions of approval to the draft resolutions, to reduce the potential environmental impacts of the project to less than significant levels: © Biological Resources: Nesting surveys consistent with the federal Migratory Bird Treaty Act and the California Department of Fish and Game Code are required. Hazards and Hazardous Materials: Prior to the issuance of the demolition permit, an Asbestos and Lead assessment study will be conducted. Soil mediation measures will be employed to reduce the pesticide and other soil contaminate levels as identified in the soils report. The septic tanks shall be properly removed and disposed of prior to the issuance of construction permits. Soil Remediation: Phase I and Phase II environment assessments and additional reports indicated elevated levels of lead, arsenic, and pesticides where samples were taken from the site. The reports conclude these are most likely attributable to prior agricultural and gardening uses. Since this contamination can lead to adverse impacts if not corrected, the site must be remediated by removing and disposing the impacted soil as prescribed by County of Santa Clara Environmental Health Department and Soil Remediation Plan. A condition of approval has been added to require this prior to any demolition or site disturbance activities. On November. 16, 2017, the Environmental Review Committee (ERC) ,recommended adoption of the Mitigated Negative Declaration (EA -2017-03) for the project per the California Environmental Quality Act (CEQA). Other Department/Agency Review TheCity's Public Works Department has reviewed the project and has no objections. Their conditions have been incorporated as conditions of approval in the draft resolutions. TM -2016-02, EA -2017-03 10208 Orange Avenue December 14, 2017 Page 5 of 6 PUBLIC NOTICING AND COMMUNITY OUTREACH The following table is a brief summary of the noticing done for this project: ® One site sign posted on the site (at least 10 days prior to hearing) Legal ad placed in the newspaper (at least 10 days prior to hearing) ® 70 notices mailed to property owners within 300' of project site (10 days prior to ® Posted on the City's official notice bulletin board (one week prior to hearing) ® Posted on the City of Cupertino's Web site (one week prior to hearing) No public comments were received at the time of staff report production. PERMIT STREAMLINING ACT This matter is adjudicatory and is subject to the Permit Streamlining Act (Government Code Section 65920 — 65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project ]Deceived: June 30, 2016;. Deemed Incomplete: July 20, 2016; Project Resubmitted: November 1, 2016; Deemed Incomplete: November 22, 2016; Project Resubmitted: February 7, 2017; Deemed Incomplete: March 7, 2017; Project Resubmitted: October 15, 2017; Deemed Complete: November 2, 2017 The City had 60 days, until, January 2, 2017 to make a decision on the project. CONCLUSION Staff recommends approval of the Tentative Map because the project is consistent with the General Plan, subdivision ordinance, and conforms .to the single-family residential development pattern, in accordance with Chapters 18.20 of the Cupertino Municipal Code. NEXT STEPS The Hearing Officer's decision on this project is final unless appealed within 14 calendar days of the decision. The 'applicant may submit applications for grading and other permits after the appeal period ends and may commence construction activities as soon as the site remediation is complete. This approval expires on December 14, 2019, at which time the applicant may apply for a one-year extension. TM -2016-02, EA -2017-03 10208 Orange Avenue December 14, 2017 Paae 6 of 6 Prepared by: Gian Paolo Martire, Associate Planner . Reviewed and Approved by: Piu Ghosh, Principal Planner Attachmenis 1 Draft Resolution for EA -2017-03 2 - Draft Resolution for TM -2016-01 3 - Initial Study, ERC Recommendation 4 - Plan set CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 84 OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO TO ALLOW THE SUBDIVISION OF AN APPROXIMATELY .29 ACRE LOT INTO TWO (2) PARCELS OF APPROXIMATELY 6,000 SQUARE FEET AT 10206 & 10208 ORANGE AVE(APN 357-18-032) SECTION I: PROTECT DESCRIPTION Application No.: TM -2016-02 Applicant: Thomas Adamo Location: 10206 & 10208 Orange Ave (APN: 357-18-032) SECTION II: FINDINGS WHEREAS, the City of Cupertino received an application to subdivide an approximately .29 acre lot into two (2) parcels of approximately 6,000 square feet; and. WHEREAS, prior to the Administrative Hearing the Environmental Review Committee heard the item on November 14, 2017 during which it reviewed the Draft Mitigated Negative Declaration, received public comments, and recommended adoption of a Mitigated Negative Declaration on a 4-0-1 (Brandt absent) vote; and WHEREAS, on December 14, 2017 the Administrative Hearing Officer adopted the Initial Study/Draft MND as the Final Initial Study/Mitigated Negative Declaration for the project after adopting all the identified mitigation measures as conditions of approval for the project; and WHEREAS, the necessary notices have been given in accordance with the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held one or more Public Hearings on this matter; and WHEREAS; the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative. Hearing Officer finds: Resolution No. 84 TM -2016-02 December 14, 2017 Page - 2 - a. That the proposed subdivision map is consistent with the City of Cupertino General Plan. The subject property is consistent with the General Plan since the property is permitted to have up to two dwelling units based on its land use designation of Residential (4.4 — 7.7 DU/acre.) Additionally, the proposed lots are sized to be comparable to adjacent residential development, and are compatible with the existing neighborhood lot orientation pattern. The lot acreage will be consistent . with the underlying single family residential standards proposed with a minimum lot square footage of 6,000 square feet. The proposed subdivision is compatible with the adjoining land uses and no physical constraints are present that would conflict with anticipated land use development. The proposed properties are designed to allow for future passive solar as the lot configurations allow for a structure to be oriented in an east -west alignment for southern exposure. Furthermore the design and improvement of the divided parcel does not result in any reduction in allowable densities or percentage of a lot that may be occupied by a building in providing for future passive solar provisions. b. That the design and improvements of the proposed subdivision are consistent with the General Plan. The subject property is consistent with the General Plan since the property is permitted to have up to two dwelling units based on its land use designation of Residential (4.4 — 7.7 DU/acre.) Additionally, the proposed lots are sized to be comparable to adjacent residential development, and are compatible with the existing neighborhood lot orientation pattern. The lot acreage will be consistent with the underlying single family residential standards proposed with a minimum lot square footage of 6,000 square feet. The proposed subdivision is compatible with the adjoining land uses and no physical constraints are present that would conflict with anticipated land use development. c.. That the site is physically suitable for the type development contemplated under the approved subdivision. The proposed subdivision is compatible with the adjoining land uses and no physical constraints are present that would conflict with anticipated land use development. There are no topographical anomalies that differentiate this property from adjacent properties. The site is located on the valley floor and the proposed two lot subdivision is typical of properties in the neighborhood. d. That the site. is physically suitable for the. intensity of development contemplated under the approved subdivision. The subject property is physically suitable in size and shape in conformance to development standards and is appropriately configured to accommodate reasonably sized single-family dwelling units. Resolution No. 84 TM -2016-02 December 14, 2017 Page - 3 - e. That the design of the subdivision or the proposed improvements are not likely to cause substantial environmental damage nor substantially and avoidable injure fish and wildlife or their habitat. The proposed subdivision design and improvements are not likely to cause serious public health problems nor substantially injure fish and wildlife or their habitat because the property is a developed site and located in an urbanized area where residential land use is allowed. f. That the design of the subdivision or the type of improvements associated therewith are not likely to cause serious public health problems. The proposed development is consistent with the existing adjacent residential development, and the on-site and off-site improvements improve neighborhood walkability through new detached sidewalk construction with size -appropriate driveway cuts and street and private trees planting. g. That the design of the subdivision and its associated improvements will not conflict with easements acquired by the public at large for access through or use of property within the proposed subdivision. No easement or right-of-way exists .currently that would be impeded or conflict with the proposed subdivision. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on Page 2 thereof, the application for a Tentative Map, Application no. TM -2016-02, is hereby approved; and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the Public Hearing record concerning Application no. TM -2016-02 as set forth in the Minutes of Administrative Hearing Meeting of December 14, 2017, and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. APPROVED EXHIBITS Approval is based on the plan set entitled, "10206 & 10208 Orange Avenue', drawn by Giuliani & Kull, Inc., and Adamo & Associates, Inc., consisting of six (6) sheets labeled Sheet 1, C-1, C-2, A0.1, A1.1, and A1.2, except as may be amended by conditions in this resolution. Resolution No. 84 TM -2016-02 December 14, 2017 Page - 4 - 2. ACCURACY OF PROTECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. EA -2017-03 shall be applicable to this approval. 4. DEVELOPMENT ALLOCATION The project is granted a development allocation of one unit from the Monta Nista Special Planning Area allocation. 5. BELOW MARKET RATE HOUSING PROGRAM The applicant shall participate in the City's Below Market Rate (BMR) Housing Program by paying the housing mitigation fees as per the Housing Mitigation Manual. These fees will be assessed at the time of Building permit issuance for the net new residential unit and any proposed accessory dwelling units. 6. MINIMUM LOT SIZE The minimum lot size of the parcels will be at least 6,000 s.f. upon subdivision. 7. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS a. All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public. works. b. Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c. Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during the nighttime period as defined in the Municipal Code. d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of of the Cupertino Municipal Code. Resolution No. 84 TM -2016-02 December 14, 2017 Page - 5 - e. Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f. The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. The applicant shall annotate all permit plans with the above requirements and shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated. 8. CONSTRUCTION MANAGEMENT PLAN Final map improvement plans shall include a construction management plan detailing how construction activities will be conducted. The plan shall address, but not be limited to the following activities: a. Construction staging area (shall not occur within 15 feet of neighboring residential property lines) b. Construction schedule and hours c. Construction phasing plan, if any d. Contractor parking area e. Tree preservation/protection plan f. Site dust, noise and storm run-off management plan. g. Emergency/complaint and construction site manager contacts 9. DEMOLITION OF STRUCTURES Prior to recordation of the final neap, the applicant shall demolish and remove all non -conforming structures on the property. All demolished buildings and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials will be recycled prior to issuance of demolition permit. 10. GREEN BUILDING The City recommends that the applicant incorporate green building measures into the project. The green building measures may include but not be limited to: low TOC paints, maximizing recycled building materials, solar efficiency/energy, energy efficient windows/ appliances/mechanical equipment, maximizing onsite water retention, and draught tolerant and pest resistant landscaping. 11. FENCES Any changes to the fencing shall require design review with the Community Development Department and shall comply with Cupertino Municipal Code Chapter 19.48 Fences. Resolution No. 84 TM -2016-02 December 14, 2017 Page - 6 - 12. LANDSCAPE PROTECT SUBMITTAL Prior to issuance of building permits, the applicant shall submit a landscape project submittal per sections 14.15.040 or 14.15.050 of the Landscaping Ordinance of more than 500 square feet of landscaping area, is proposed. The Water -Efficient Design Checklist (Appendix A of Chapter 14.15), Landscape and Irrigation Design Plans, and Water Budget Calculations shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits. 13. LANDSCAPE INSTALLATION REPORT The project is subject to all provisions delineated in the Landscape Ordinance (CMC, Chapter 14.15). A landscape installation audit shall be conducted by a certified landscape professional after the landscaping and irrigation system have been installed. The findings of the assessment shall be consolidated into a. landscape installation report. The landscape installation report ' shall include, but is not limited to: inspection to confirm that the landscaping and irrigation system are installed as specified in the landscape and irrigation design plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that causes overland flow, and preparation of an irrigation schedule. The landscape installation report shall include the following statement: "The landscape and irrigation system have been installed as specified in the landscape and irrigation design plan and complies with the criteria of the ordinance and the permit." 14. LANDSCAPE AND IRRIGATION MAINTENANCE Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be established and submitted to the Director of Community Development or his/her designee, either with the landscape application package, with the landscape installation report, or any time before the landscape installation report is submitted. a) Schedules should take into account water requirements for the plant establishment period and water requirements for established landscapes. b) Maintenance shall include, but not be limited to the following: routine inspection; pressure testing, adjustment and repair of the irrigation system; aerating and de - thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of failed plants; weeding; pest control; and removing obstructions to emission devices. c) Failed plants shall be replaced with the same or functionally equivalent plants that may be size -adjusted as appropriate for the stage of growth of the overall installation. Failing plants shall either be replaced or be revived through appropriate adjustments in water, nutrients, pest control or other factors as recommended by a landscaping professional. Resolution No. 84 TM -2016-02 December 14, 2017 .Page - 7 - 15. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible for consulting with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 16. EXPIRATION The approval or conditional approval of the Tentative Map Subdivision shall expire twenty four (24) months from the date of Administrative Hearing approval. An extension or extensions may be approved as provided in Section 18.20.080. 17. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the "indemnified parties") from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys' fees and costs within 30 days following receipt of invoices from City. Such attorneys' fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and .other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 18. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90 -day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPT. 1. STREET IMPROVEMENTS & DEDICATION Provide a street dedication in fee title and frontage improvements along the project to the satisfaction of the City Engineer. Resolution No. 84 TM -2016-02 December 14, 2017 Page - 8 - Street improvements may include, but not be limited to curb and gutter, new detached sidewalk, new ADA ramp, driveways, storm drain lateral, street tree installations, and street light and/or utility facility relocations and undergrounding, in accordance with City standards, codes and policies as specified and to the satisfaction of the City Engineer. 2. UTILITY POLE RELOCATION Developer shall relocate the existing utility pole located along the project frontage to a position behind the new curb and gutter improvements. Developer shall ensure that there is adequate ADA access along the new sidewalk around the relocated pole. The Developer shall work directly with PG&E and the other utility companies to have the pole relocated prior to project final signoff. 3. UTILITY SERVICES Developer shall install all utility services (including water, sanitary sewer and joint trench facilities) to the properties prior to final signoff of the project. 4. TRAFFIC IMPACT FEES The Project may be subject to pay Traffic Impact Fees. The fee is set at $6,025 per new AM or PM peak -hour trip generated by the Project subject. 5. PEDESTRIAN AND BICYCLE IMPROVEMENTS Developer shall provide pedestrian and bicycle related improvements (eg. walkway and bicycle racks, etc.) consistent with the Cupertino Bicycle Transportation Plan and the Pedestrian Transportation Guidelines, and as approved by the City Engineer. 6. STREET LIGHTING INSTALLATION Street lighting shall be installed and shall be as approved by the City Engineer. Lighting fixtures shall be positioned so as to preclude glare and other forms of visual interference to adjoining properties, and shall be no higher than the maximum height permitted by the zone in which the site is located. 7. GRADING Grading shall be as approved and required by the City Engineer in accordance with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits maybe required. Please contact Army Corp of Engineers and/or Regional Water Quality Control Board as appropriate. Resolution No. 84 TM -2016-02 December 14, 2017 Page - 9 - 8. DRAINAGE Drainage shall be provided to the satisfaction of the City Engineer. Any storm water overflows or surface sheeting should be directed away from neighboring private properties and to the public right of way as much as reasonably possible. Hydrology and pre- and post -development hydraulic calculations must be provided to indicate whether additional storm water control measures are to be constructed or renovated. The storm drain system may include, but is not limited to, subsurface storage of peak stormwater flows (as needed), bioretention basins, vegetated swales, and hydrodynamic separators to reduce the amount of runoff from the site and improve water quality. The storm drain system shall be designed to detain water on- site (e.g., via buried pipes, retention systems or other approved systems and improvements) as necessary to avoid an increase of the ten percent flood water surface elevation to the satisfaction of the City Engineer. Any storm water overflows or surface sheeting should be directed away from neighboring private properties and to the public right of way as much as reasonably possible. All storm drain inlets shall be clearly marked with the words "No Dumping — Flows to Creek" using permanently affixed metal medallions or equivalent, as approved by the Environmental Programs Division. 9. UNDERGROUND UTILITIES Developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate with affected utility providers for installation of underground' utility devices. Developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the City Engineer. 10. IMPROVEMENT AGREEMENT The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for under grounding of utilities. Said agreement shall be executed prior to issuance of construction permits Fees: a. Checking & Inspection Fees: b. Grading Permit: c Storm Drainage Fee: d. Power Cost: e. Map Checking Fees: $ Per current fee schedule ($3,648.00 or 5%) $ Per current fee schedule ($931.00) $1,393.00 $ Per current fee schedule ($5,528.00) Resolution No. 84 TM -2016-02 December 14, 2017 Page -10 - f. Park Fees: TBD per fee schedule (potentially $12,000) g. Traffic Impact Fees: TBD per fee schedule (Potentially $6,025) h. Street Tree $387.00 Per Tree Based on the latest effective PG&E rate schedule approved by the PUC Bonds: Faithful Performance Bond:100% of Off-site and On-site Improvements Labor & Material Bond: 100% of Off-site and On-site Improvement On-site Grading Bond: 115% of site improvements. - The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. 11. SURVEYS A boundary survey and a survey map prepared by a licensed Land Surveyor will be required for all new construction to ensure the proposed building will be set based on the boundary survey and setback requirements. 12. TRANSFORMERS Electrical transformers, telephone cabinets and similar equipment shall be placed in underground vaults. The developer must receive written approval from both the Public Works Department and the Community Development Department prior to installation of any above ground equipment. Should above ground equipment be permitted by the City, equipment and enclosures shall be screened with fencing and landscaping such that said equipment is not visible from public street areas, as determined by the Community Development Department. Transformers shall not be located in the front or side building setback area. 13. WATER BACKFLOW PREVENTERS Domestic and Fire Water Backflow preventers and similar above ground equipment shall be placed away from the public right of way and site driveways to a location approved by the Cupertino Planning Department, Santa Clara County Fire Department and the water company. Resolution No. 84 TM -2016-02 December 14, 2017 Page -11 - 14. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMPs), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in grading and street improvement plans. 15. NPDES CONSTRUCTION GENERAL PERMIT When and where it is required by the State Water Resources Control Board (SWRCB), the developer must obtain a Notice of Intent (NOI) from the, SWRCB, which encompasses preparation of a Storm Water Pollution Prevention Plan (SWPPP), use of construction Best Management Practices (BMPs) to control storm water runoff quality, and BMP inspection and maintenance. 16. C.3 REQUIREMENTS C.3 regulated improvements are required for all projects creating and/or replacing 10,000 S.F. or more of impervious surface (collectively over the entire project site). If C.3 improvements are required, the developer shall reserve a minimum of 4% of developable surface area for the placement of low impact development measures, for storm water treatment, on the tentative map, unless an alternative storm water treatment plan, that satisfies C.3 requirements, is approved by the City Engineer. The developer must include the use and maintenance of site design, source control and storm water treatment Best Management Practices (BMPs), which must be designed per approved numeric sizing criteria.. A Storm Water Management Plan, Storm Water Facilities Easement Agreement, Storm Water Facilities Operation and Maintenance Agreement, and certification of ongoing operation and maintenance of treatment BMPs are each required. All storm water management plans are required to obtain certification from a City approved third party reviewer. 17. EROSION CONTROL PLAN Developer shall provide an approved erosion control plan by a Registered Civil Engineer. This plan should include all erosion control measures used to retain materials on site. Erosion control notes shall be stated on the plans. 18. WORK SCHEDULE Every 6 months, the developer shall submit a work schedule to the City to show the timetable for all grading/erosion control work in conjunction with this project. 19. OPERATIONS & MAINTENANCE AGREEMENT Developer shall enter into an Operations & Maintenance Agreement with the City prior to final occupancy. The Agreement shall include the operation and maintenance Resolution No. 84 TM -2016-02 December 14, 2017 Page -12 - for non-standard appurtenances in the public road right-of-way that may include, but is not limited to, sidewalk, pavers, and street lights. 20.. TRAFFIC SIGNS Traffic control signs shall be placed at locations specified by the City. 21. STREET TREES Street trees shall be planted within the Public Right of Way to the satisfaction of the City Engineer and shall be of a type approved by the City in accordance with Ordinance No. 125. The City will install street trees at the end of the project, and will situate the trees as close to the developers desired location as possible, while avoiding other existing facilities. 22. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City. 23. SANTA CLARA COUNTY FIRE DEPARTMENT A letter of clearance for the project shall be obtained from the Santa Clara County Fire Department prior to. issuance of building permits. Clearance should include written approval of the location of any proposed Fire Backflow Preventers, Fire Department Connections and Fire Hydrants (typically Backflow Preventers should be located on private property adjacent to the public right of way, and fire department connections must be located within 100' of a Fire Hydrant). 24. FIRE HYDRANT Fire hydrants shall be located as required by the City and Santa Clara County Fire Department as needed. 25. SAN JOSE WATER COMPANY CLEARANCE Provide San Jose Water Company approval for water connection, service capability and location and layout of water lines and backflow preventers before issuance of a building permit approval. 26. DEDICATION OF UNDERGROUND WATER RIGHTS Developer shall "quit claim' to the City all rights to pump, take or otherwise extract water from the underground basin or any underground strata in the Santa Clara Talley. 27. SANITARY DISTRICT A letter of clearance for the project shall be obtained from the Cupertino Sanitary District prior to issuance of building permits. Resolution No. 84 TM -2016-02 December 14, 2017 Page -13 - 28. UTILITY EASEMENTS Clearance approvals from the agencies with easements on the property (including PG&E, AT&T, and California Water Company, and/or equivalent agencies) will be required prior to issuance of building permits. CITY ENGINEER'S CERTIFICATE OF ACCEPTANCE OF ]ENGINEERING/SURVEYING CONDITIONS (Section 66474.18 California Government Code) I hereby certify that the engineering and surveying conditions specified in Section IV. of this Resolution conform to generally accepted engineering practices. /s/Timm Borden Timm Borden, Director of Public Works City Engineer CA License 45512 PASSED AND ADOPTED this 14th day of December, 2017 at a noticed Public Hearing of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: /s/Gian Paolo Martire /s/Benjamin Fu Gian Paolo Martire Benjamin Fu Associate Planner Asst. Director of Community Development CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 85 OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO ADOPTING A MITIGATED NEGATIVE DECLARATION AND MITIGATION MONITORING AND REPORTING PROGRAM TO SUBDIVIDE AN APPROXIMATELY .29 ACRE LOT INTO TWO (2) PARCELS OF APPROXIMATELY 6,000 SQUARE FEET AT 10206 & 10208 ORANGE AVE (APP 357-18-032) SECTION I: PROTECT DESCRIPTION Application No:, EA -2017-03 Applicant: Thomas Adamo Location: 10206. & 10208 Orange Ave (APN: 357-18-032) SECTION. II: ENVIRONMENTAL REVIEW PROCESS WHEREAS, the City of Cupertino received an application to subdivide. an approximately .29 acre lot into two (2) parcels of approximately 6,000 square feet; and WHEREAS, pursuant to the provisions of the California Environmental Quality Act of 1970 (Public Resources Code Section 21000 et seq.) ("CEQA") together with the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.) (hereinafter, "CEQA Guidelines"), the City prepared an Initial Study and proposed Mitigated Negative Declaration for the Project ("IS/MND"); and WHEREAS, the Project is additionally described in the October 2017 "Orange Avenue Lot Split Project" Draft Initial Study/Mitigated Negative Declaration ("Draft IS/MND"); and WHEREAS, on November 3, 2017 the City issued a Notice of Intent to Adopt a Mitigated Negative Declaration; and WHEREAS, on November 3, 2017 the Draft IS/MND for the project was distributed to responsible agencies .and the public for review and comment for a 20 -day period that ended November 23, 2017; and WHEREAS, the IS/MND concluded that significant environmental effect on Biological Resources, and Hazards & Hazardous Materials would be avoided or reduced to less - than -significant levels by mitigation measures ("MM") identified in the IS/MND; and Resolution No. 85 EA -2017-03 December 14, 2017 Page -2 WHEREAS, On November 14, 2017, prior to making any recommendations regarding the adoption of the Draft lS/MINI), the City of Cupertino's Environmental Review Committee held a duly noticed public hearing to receive public testimony where it reviewed and considered the information contained in the Draft IS/MND, voted 4-0-0 to recommend that the Hearing Officer adopt the Draft IS/MIND (EA -2017-03) and mitigation measures; and WHEREAS, the Hearing Officer has independently reviewed and considered the IS/MND prior to taking action on the Project; WHEREAS, on December 14, 2017 prior to taking action on the Project, the Hearing Officer held a duly noticed public hearing to receive staff's presentation and public testimony, and to further consider the information contained in the Final IS/MND, along with all staff reports, other pertinent documents, and all written and oral statements received prior to and at the public hearing; NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony, staff reports, public comments, and other evidence submitted in this matter, the Hearing Officer: 1. Finds that the Final IS/MND for the Project has been completed in compliance with the CEQA and reflects the independent judgment and analysis of the City. 2. Finds that, on the basis of the whole record before it, there is no substantial evidence that the Project as proposed and mitigated will have a significant effect on the environment. 3. Adopts the Final Mitigated Negative Declaration (Final MND) for the Project. 4. Adopts the Mitigation Monitoring and Reporting Program for the Project, attached hereto as Exhibit EA -1, and incorporated herein by reference, which incorporates all the mitigation measures required under the Final MND. The Hearing Officier further makes the mitigation measures required conditions of approval of the Project to the extent they are within the responsibility and jurisdiction of the City as summarized below: a. BIOLOGICAL RESOURCES MITIGATION MEASURES MM IV -1: A pre -construction survey for nesting birds shall be conducted for the project site and a 250 -foot radius around the project site by a qualified biologist not more than two weeks prior to site. disturbance wring the breeding season (February 1 to August 371). If site disturbance commences outside the breeding season, a pre - construction survey for nesting birds are not required. If active nests of migratory Resolution No. 85 EA -2017-03 December 14, 2017 Page -3 birds are not detected within approximately 250 feet of the project site, further mitigation is not required. Results of the survey shall be submitted to the Community Development Department. If nesting raptors or other migratory birds are detected on or within 250 feet of the site during the survey, a suitable construction -free buffer shall be established around all active nests. The dimensions of the buffer shall be a minimum of 75 feet for passerine birds and 250 feet for raptors. The buffer size may vary depending on location and species. The buffer areas shall be enclosed with temporary fencing, and construction equipment and workers shall not enter the enclosed setback areas. Buffers shall remain in place for the duration of the breeding season or until a qualified biologist has confirmed that all chicks have fledged and are independent of their parents. b. HAZARDS AND HAZARDOUS MATERIALS MM DTIII -10 ]prior to issuance of a demolition permit for any on-site structures, the project applicant shall consult with certified Asbestos and/or Lead Risk Assessors to complete and submit for review to the Community Development Department an asbestos and lead survey. If. asbestos -containing materials or lead -containing materials are not discovered during the survey, further mitigation related to asbestos -containing materials or lead containing materials shall not be required. If asbestos -containing materials and/or lead -containing materials are discovered by the survey, the project applicant shall prepare a work plan to demonstrate how the on-site asbestos -containing materials and/or lead -containing materials shall be removed in accordance with current California Occupational Health and Safety (Cal -OSHA) Administration regulations and disposed of in accordance with all CalEPA regulations, prior to the demolition, and/or removal of the on-site structures. The plan shall 'include the requirement that work shall be conducted by a Cal -OSHA registered asbestos and lead abatement contractor in accordance with Title 8 CR 1529 and Title 8 CCR 1532.1 regarding asbestos and lead training, engineering controls, and certifications. The applicant shall submit the work plan to the Community. Development Department for review and approval. Materials containing more than one (1) percent asbestos that is friable are also subject to BAAQMD regulations. Removal of materials containing more than one (1) percent friable asbestos shall be completed in accordance with BAAQMD Section 11-2-303. MM 1V111 -2o Prior to initiation of demolition or construction activities, the project applicant shall comply, with all applicable recommendations within the Soil Remediation Resolution No. 85 EA -2017-03 December 14, 2017 Page -4 Plan prepared for the proposed project by McCloskey Consultants, Inc. The required remediation activities shall be performed by a licensed hazardous waste contractor (Class A) and contractor personnel that have completed 40 -hour OSHA hazardous training. Compliance with the recommendations shall be verified by the Community Development Department and the Santa Clara County Environmental Health Department throughout the remediation process. MIM[ V111-3: Prior to issuance of a building/grading permits, the existing septic tank shall be abandoned in consultation with the Santa Clara County Environmental Health Department. Proof of abandonment shall be provided to the Community Development Department and the City Engineer. PASSED AND ADOPTED this 14th day of December, 2017 at a noticed Public Hearing of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: /s/Gian Paolo Martine Gian Paolo Martire Associate Planner APPROVED: /s/Benjamin Fu Benjamin Fu Asst. Director of Community Development Exhibit EA -1 Mitigation Monitoring `.ilfd, Reporting u l o'la1l] is ®- X r I a _ i v i P sAPN 357-18-032]l Impact Mitigation Measure Timeframe and Responsibility for Implementation Method of Compliance Oversight of Implementation BIOLOGICAL RESOURCES IMPACT A - BIO Mitigation Measure IST -1: If construction If grading and/or tree Director of Have a substantial, A pre -construction survey for nesting activities and any . removal begins during the Community adverse effect, either birds shall be conducted for the project required tree removal stated dates in the Development directly or through site and a 250 -foot radius around the occur during the mitigation measure, a final habitat modifications, project site by a qualified biologist not breeding season report of nesting birds, on any species more than two weeks prior to site (February 1 and including any protection identified as a disturbance during the breeding August 31), a qualified measures, shall be candidate, sensitive, season (February 1 to August 31). If site biologist (hired by the submitted to the Director of or special status disturbance commences outside the Project proponent) Community Development species in local or breeding season, a pre -construction shall conduct surveys prior to the start of regional plans, survey for nesting birds are not prior to tree removal demolition and/or any policies, or required. If active nests of migratory or construction construction activity, regulations, or by the birds are not detected within activities. including grading. California approximately 250 feet of the project Department of Fish site, further mitigation is not required. Preconstruction and Game or U.S. Fish Results of the survey shall be surveys are . not and Wildlife Service? submitted to the Community required for tree Development Department. removal or construction activities If nesting raptors or other migratory outside the nesting birds are detected on or within 250 feet period. of the site during the survey, a suitable construction -free buffer shall. be Preconstruction established around all active nests. The surveys shall be dimensions of the buffer shall be a repeated at 147day minimum of 75 feet for passerine birds intervals - until and 250 feet for raptors. The buffer size construction has been may vary depending on location and ` initiated. in the area species. The buffer areas shall be after which surveys enclosed with temporary fencing, and can be stopped. Impact Mitigation Measure Timeframe and Method of Compliance Oversight of Responsibility for Implementation Implementation construction equipment and workers shall not enter the enclosed setback areas. Buffers shall remain in place for the duration of the breeding season or until a qualified biologist has confirmed that all chicks have fledged and. are independent of their parents. HAZARDS AND HAZARDOUS MATERIALS IMPACT B — Hazards Mitigation Measure DTIII -7L Prior to issuance of a Results of the asbestos and Director of Create a significant Prior to issuance of a demolition permit demolition permit, a lead survey shall be Community hazard to the public or for any on-site structures, the project certified Asbestos submitted for review to the Development, . the environment applicant shall consult with certified and/or Lead Risk Community Development BAAQMD: Asbestos, through reasonably Asbestos and/or Lead Risk Assessors to Assessor shall Department prior to. Compliance & foreseeable upset and complete and submit for review to the complete an asbestos issuance of grading and/or Enforcement accident conditions Community Development Department and lead survey of the demolition permits. involving the likely an asbestos and lead survey. If existing structures. If release of hazardous asbestos -containing materials or lead- asbestos -containing If a work plan is required materials into the containing materials are not discovered materials and/or lead- for the removal of asbestos - environment? during the survey, further mitigation containing materials or lead -containing related to asbestos -containing are discovered, the materials, the applicant materials or lead containing materials project applicant shall shall submit such work shall not be required. If asbestos- prepare a work plan to plan to the Community containing materials and/or lead- demonstrate that Development Department containing materials are discovered by removal of the for review and approval the survey, the project applicant 'shall asbestos or lead- prior to issuance of prepare a work plan to demonstrate containing materials, grading and/or demolition how the on-site asbestos -containing ``shall be conducted in permits. materials and/or lead -containing ' compliance with Cal - materials shall be removed in OSHA and CalEPA Should materials accordance with current California regulations. containing more than one Occupational Health and Safe (Cal- percent asbestos that is Impact Mitigation Measure Timeframe and Responsibility for Implementation Method of Compliance Oversight of implementation OSHA) Administration regulations friable be identified in the and disposed of in accordance with all survey, the work plan for CalEPA regulations, prior to the removal shall be prepared demolition and/or removal of the on- in compliance with site structures. The plan shall include BAAQMD regulations and the requirement that,,work shall be submitted to BAAQMD for conducted by a Cal -OSHA registered review prior to issuance of asbestos and lead abatement, contractor grading and/or demolition in. accordance with Title 8 CCR 1529 permits. and Title 8 CCR 1532.1 regarding asbestos and lead training, engineering controls, and certifications. The applicant shall submit the work plan to the Community Development Department for review and approval. Materials containing more than one (1) percent asbestos that is friable are also subject to BAAQMD regulations. Removal of materials containing more than one (1) percent friable asbestos shall be completed in accordance with BAAQMD Section 11-2-303. Mitigation Measure VIII -2: Prior to initiation of Proof that Santa Clara County Prior to initiation of demolition or demolition or recommendations in the Environmental Health construction activities, the project construction activities. Soil Remediation Plan have Department, Director applicant shall comply with all been carried out by a of Community applicable recommendations within licensed hazardous waste Development the Soil Remediation Plan prepared for contractor, shall be the proposed project by McCloskey provided to the Consultants, Inc. The required Community Development remediation activities shall be Department and the Santa Impact Mitigation . M[easure 'timeframe and Responsibility for Implementation Method of Compliance Oversight of Implementation performed by a licensed hazardous Clara County waste contractor (Class A) and Environmental Health contractor personnel that have Department prior to the completed 40 -hour OSHA hazardous start of demolition and/or training. Compliance with the any construction activity, recommendations shall be verified by including grading. the Community Development Department and the Santa Clara County Environmental Health Department throughout the remediation process. Mitigation Measure VIII -3: Prior to issuance of Proof of septic tank Santa Clara County Prior to issuance of a building/grading building/grading abandonment shall be Environmental Health permits, the existing septic tank shall permits. provided to the Department, City be abandoned in consultation with the Community Development Engineer, Director of Santa Clara County Environmental Department and the City Community Health Department. Proof of Engineer prior to issuance Development abandonment shall be provided to the of building/grading Community Development Department permits. and the City Engineer. EY,.i2•,SD 5: r I, h, GPAPHIC SCALE 40 -P�`Q��`1h IN FEET j L'A'NrD S "OF (DOC. NO - -------- 0. R . ) APN 357-18-039 h BENCH MARK: CITY OF CUPERTINO #26 ELEV. = 334.83 LANDS OF O.R.) 1 APN 35718-040 AVENUE ��-'°. v 0 4 k•`,1°j ) kk 1 .y"J � ,;1 - °Py1, .�tx ;"`' ,� I I bk, 6 ��FENCE 'y�°S89�JrS'02"E ..135.00' �; `y~'i ° 1 o. 00 \1' °9 WIRE FENCE kph° 125.00'. °rYa ' Y� WIRE SS i LOT "C" BLOCK 9 RESUBDIVISION OF SUBDIVISION NO. 1 , TOWN OF MONTA VISTA ("P" M 24) LANDS.OF a'' " LOT U o. (AREA=6,001 t S. °� IJ z f o I�,1 o�e LANDS OF o a ExlsnNc BurcarvG o ix i% ®, k ^.OHC. .�.. u v�,..- \.', o °t. 6 A i.I RE-il Ili ON, r — ` cJBn11!IGiOr'; Af, r J (DOC. N0. — — — — 0. R.) r04+,A' 0 MONTE VIST/, p -- d j 1",n"" APS 2 APN 357-18-023 r EX12"sr —l0 ��4 � 5o M1 Q yb ri., z�r ra .tir,E F I k aI zo +•y 1h0 anti I ! ry 3A �, +4 D415'b�! h�ry 1 I I I — — — -,� PROPOS .'t3�lV E1 1'ROPEN i LlA1E v)2- s ?,�tik w r B I 1`S89 58'17"W 125.0d'H a FENCE x c' 1 a 10' STREET. DEDICATION iM \1 \ (AREA -9601 SF.) I I �� old• �,`L•' > '\ 01 I I Ik1�° `LOT 2 Io A� (AREA=6,000 t S.F.) h ) ir x 1 k° k °9 k�. �--� xFENCE — o > z_ G .O F °� 9h �' LANDS OF 11 �Y° �k° O !'yk°j- VF�tyC -14C �. E CDlJC k�. (DOC. NO .-------- 0. R.) . APN 357-18-024 / EY.IS7ING BUILDING z yh LEGEND N c" h !1- 125.00 yk BUILDING F007PRINT FcN„c ., ,. x � ' N89 58'17W WObD FENCE 135.00' yo+ A TREE ov 9, yh l�-11- 7hY1—T�v : � o cn 00In 0", WATER VALVE n 0'r WATER METER LANDS OF ti. I I hh W wj 5 �`ti 40�I,��° LOT 1 P.M. (854 Nl 48) A �F 1 %jfikLL SS Gc S4 APN 357-18-043 i I `try Y 'o D t f@ C � C CONC. CURB & GUTTER dl 0 O n 0� CATCH BASIN — w WATER LINE (APPROX. LOCATION) — so w G —SS— SANITARY SEWER LINE (APPROX. LOCATION) RETAINING WALL —x—x x— hkti r I I — — — EDGE OF PAVEMENT Lb Lu LOT "H" BLOCK 9._ �R, juD IV N OF rp lEcauNOWL >== LOF91t!0 N TA VI STA 24) D(.-r��1LLk `ai C VICHTY MAP N. T. PROJECT DATA: OWNER: JOSEPH & DORIS C. ADAMO TRUST CONTACT: THOMAS ADAMO, CO—SUCCESSOR TRUSTEE 21060 HOMESTEAD ROAD SUITE 120 CUPERTINO, CA 95014 650-279-3905 PROJECT ADDRESS: 10206 ORANGE AVENUE CUPERTINO, CA 95014 A.P.N. 357-18-032 EXISTING LOT AREA: GROSS: 12,960 SQ. FT. NET: 12,000 SQ. FT. PROPOSED GROSS: 2 IDENTICALLY—ZONED & SIZED PARCELS PROPOSED LOT AREA: GROSS & NET: 6,000 SQ. FT. �9 LANDA. s0 NO. L7078 EXP. 12-31-16 qT� OF CLy1��4 a. ll� m m m O z H mow= S U ^II 3 W U LEGEND N c" PROPERTY LINE BUILDING F007PRINT E J} TREE ` FIRE HYDRANT o cn 00In 0", WATER VALVE n 0'r WATER METER 0 O JOINT POLE 5 Q SANITARY MANHOLE Gc O95 SANITARY CLEANOUT CONTOUR LINE C � C CONC. CURB & GUTTER 0 O n 0� CATCH BASIN — w WATER LINE (APPROX. LOCATION) — so STORM DRAIN LINE (APPROX. LOCATTON) —SS— SANITARY SEWER LINE (APPROX. LOCATION) RETAINING WALL —x—x x— FENCE LINE — — — EDGE OF PAVEMENT �9 LANDA. s0 NO. L7078 EXP. 12-31-16 qT� OF CLy1��4 a. ll� m m m O z H mow= S U ^II 3 W U (° SHEET o N OF 1 DATE 9/20/16 JOB NO. 15232 o.m N c" Y I a; o o o cn 00In O N off, O X 7) opg F� m p C � C 0 O n If o dv Q c m <r Lu Lu Lu 0 OR w U �f (° SHEET o N OF 1 DATE 9/20/16 JOB NO. 15232 m m _ - m r zx �x r , WLu O V 85 RIM ELEVATIONSTEVENS CREEK BLVD z ' a SHOWN ON PLAN ¢ w 18" MIN Ix SWAL DRAIN DRAIN SWA'LRA Q Q `%;�iiii� LOMITA AVE \��\\SQUARE / \/ 'CHRISTY" U21S CATCH 6" (-1.1 I—III �Q� BASIN 2X2 LD. WITH I—III=1\&7k —r PROVIDE 6" OF COBBLE STONE EXTENSIONS I.1- ALMADEN AVE OLIVE AVE cn\\\ � o 0 o I-1 I FILTER FABRIC (MIRAFI 140-N OR w a o I-I I I _ \\ STORM DRAIN=NLANL 12' III— EQUAL) 12" OVERLAP ALL e z PIPES SHOW-III- AROUND _III- - - McCLELLAN RD 1n ��\ �� 0 //�� —III=1 0 0 1— - 6" PERFORATED HDPE (ADS N-12 rn f `O D 6" LAYER OF DRAIN ROCK I OR EQUAL) LAID FLAT WITH HOLES I ¢ 0 Q �� \OVER FILTER FABRIC I—III o - —1 FACING DOWN. " ? o //\\/O O 0 0 END SHALL HAVE CAP WITH 1/4° V�CItl��T1f ,6P N Q LAYER OF / \ — —I HOLES AT 8 O.C. L 0 FILTER FABRIC 0 18 DIA. AUGERED HOLE FILLED -III I_I _ o" O O WITH 3/4" CLEAN DRAIN ROCK. IF N.T.S. o;.4 0 xo O 12 (I I 3/4" CRUSHED CLEAN DRAIN ROCK, 6" MIN AROUND PIPE IN ALL oM4 0 0 DIRECTIONS. 0 op III-I I-1Lo DRYWELL SECTION DETAILC III -1 I I-I_I-III-I I II=1 I II N.T.S: —I � � -1 I �—� � �—� � �—� , LEGEND NOTE. • CONTRACTOR , TO TAKE EVERY PRECAUTION NECESSARY Q SO DRAIN ROCK IS NOT CONTAMINATED WITH SOIL OR SILT PROPOSED EXIS77NG - UNTIL FULLY OPERATIONAL AND LANDSCAPE IS COMPLETED. DISSIPATION. TRENCH FOR 6" PIPE ®���®y PROPERTY LINE N.T.S.,___L ._Y BUILDING FOOTPRINT Lu P.C.C. PAVEMENT 1 �3 AC PAVEMENT FIRE HYDRANT 0 O WATER VALVE Lu ❑ ❑ WATER METER0 2.0' 0 :> JOINT POLE z o� Oar, SANITARY MANHOLE O@ STORM DRAIN .MANHOLE 0 0 5`'G 05`C SANITARY CLEANOUT z � TREE = 3 EX. TREE TO BE REMOVED ® Lu IL CONTOUR LINE CONC. ROLLED CURB CONC. VERTICAL CURB TYPICAL SWALE DETAIL CONC. culla AND GUTTER m CATCH BASIN ®P� o'p AREA DRAIN — — — — — — EASEMENT LINE z BUILDING SETBACK LINE -ru-OR-1-u-OR DRAINAGE FLOW 2.0' ® ® RETAINING WALL —x—X—XFENCE LINE SEE ARCHITECTURE PLANS — —SD— — STORM DRAIN LINE FOR FENCING DETAILS®' * ®SS --SS-- SANITARY SEWER LINE 2" X 72" PRESSURE W — —W-- WATER LINE L 77?EA IED REDWOOD 4" X 6" POT G G GAS LINE BOARD (TIP.) 1 C 6 SPACING RAIN WATER LEADER CONNEC77ON GROUND SURFACE TO ROOF DOWNSPOUTS UJ IF ONLY A 6" WALL IS tt PRO I7 ����� Q��i NECESSARY SUBS771Z77Ei il� If°� �s - A 2" X 6': ffff 12" WALL/FENCE DETAIL ppicalion NumbX ALatin � m i' RCi SA. $�LTo� G SHEET a� N0. L7078 Sty EXP. 12-31-16 8gnaLuiE( dze ? 4 W�.d,,;..s�e,�,- Md'a`. kni2g � OF C9.LZ�0 of N DATE 9/22/16 N - JOB NO. N 15232 f E �t su - Y � 4 t t E - - j < I I 0 gt5' eyal i�+p ">� i I lI I �: PROJECT DATA, / �� E 10 i OWNER: JOSEPH & DORIS C. ADAMO TRUST >-,43 E to —W �` s CONTACT THOMAS ADAMO, CO—SUCCESSOR USTEE f 2211060 HOMESTEAD ROAD F: : IN i SUIT 120 "i i t7• s t .. ..., r J w -< r <. E CUP RTIN CA 95014 650-279-3905 I S' PROJECT ADDRESS: € ' r `0 10206 ORANGE AVENUE �g r i j =,. ''�� �; �•� �' `` a I CUPERiiNO, CA 95014 Y [ � � p 4 i A.P.N. 357-18-032 N pp •y^� � pi j _. ;'�, p � 6ry 1 � �_ rf Jill?, , � 1 �r ��. > �,ApO t h :� y..... �.� ', , T EXISTING LOT AREA: GROSS. NET 00 : � y ? ....•ssr — _ _ _ p �' � y�' �} � S 12, 0 1Z960 SQ. FT. ,., ° grs Xy� 41 gyp\ X; �pA•.F.I \ PROPOSED GROSS: Ory m < ` LOWER #ODF :O ❑ '"'� �. 2 IDENTICALLY—ZONED & SIZED � \� r�� ENTRY ELENFP� f RO pai PARCELS �• Et: �`` p1 j I; � s `" •,. p�• E PROPOSED LOT AREA: ❑ ik` Fgbgt oI GROSS. 6,480 SQ. FT. { ' S Pp PP R ROOF +� I NET: 6,000 SQ. FT. ` a9g l 7 E LOWER ROOF gg gp. 102 NGE % PEI ROOF . I o r jj�,L,p. a 0 I U ••ff�� LOWER. ROOF w 20:0 • f -- -- = 1 C i f FRONT SET�A'CK i �� �s = ftp �6� +?�::. REAR SETBACK0 ��N I i x I � TI >� II —..� {_,. � cNx.._.....�x •• , : ,� ... � '1 ;:ap �pq • f �< -.fl .� rt I LOWER ROOF1+ ,.._.. CURB, GUTTER, i ', &SIDEWALK t 1 \ UPPER ROOF Ji I 10208 ORANGE j 4 AVENUE ii f 5 i " 'ij �>l` PER CITY OF I CUPER71NO STANDARDS ,y. E ` E >`p�6S11gp I i LOWER ROOF h I a �'gt = - _:..,,.�� �..✓ .6 • �q. ix,'�t�lr UP R ROOF... ] ❑ ❑ _ r ENTRY ELEMENT �� gg iI i 1:sl t... \.w nd,• r� '!/� •-._�•,••'1 L❑WER ROOF ... •� � � �y 1 Q +i �' ,. ..1....../ �..�:.� } n cr p .fab "�._...... +*ttr-�.*ex�„••--.ten,••-••^.^.••r �..•••••tr••..:...m�t-.•.tel ter'*J ire..w••......,.,�r.............;............�.�.•_t.>_............ ..... ............ ".".....".......".._........»_....._. < [ Ik kk a�b 3N E ~�­4i 't`y t '"",.[' •S' ---- as ONCE c PTUAL SITE PLAN I SCALEi I ! ___'-�'�� it i � '• i - r jjjj ! Og .. i ,ekR•� '., .+ E` gIE }7j i c'> p'H �h�' E t M1y1 !1•� f Oa i ��9 Et NR .:�j Z .L ''�� �a E� ,�,y ry '•'per - _ .. - �A "p3C3.s�,d '�R.gr IIUbe s +, 7 P �yLT'�'c. \ ��'�- !r>s Ri- C JA4 t t t - ' c M 'AP S=gnalure 'nager �I Ada= &Associates, Inc. STRUCTURAL ENGINEERS 21060 Homestead Road Suite #120 Cupertino, California 95014 T406.523.1200 F406.523.1220 ISSUE: Della Description Data: SUBMITTAL 06.29.2016 RE—SUBMITTAL 10.13.2016 TITLE: 10206 & 10206 ®RP►NG� AIiENU� CUPERTINO, CA Sheet Title CONCEPTUAL SITE PLAN Stamp oQROFESS/p� y�tis�s D qp9� F� F5 52907. m a EXP. 9-3G-17 ir�T dti,.lK'i. U�P�, 9TFOFCAI hOR� Job Number 16026 Scale AS NOTED Drawn By TA Review By TA Sheet Number ®1 Of XXX Sheets Adamo & Associates, Inc. STRUCTURAL ENGINEERS 21060 Homestead Road - Suite #120 Cupertino, Callfomia 95014 T 406.523.1200 F 408.523.1220 ISSUE: Delta Descrlption Date: SUBMITTAL 06.29.2016 RE—SUBMITTAL 10.13.2016 TITLE: 10206 & 10208 ORANGE AVENUE CUPERTINO, CA Sheet Title 10206 ORANGE AVENUE CONCEPTUAL ELEVATIONS I. Stamp OQROFESS S2907 �. m EXP. 930-17 gTFOFCAI Job Number 16026 Scale AS NOTED brawn By TA Review By TA Sheet Number 1®1 Of XXX Sheets :3 0, ZO as as F= p- RIQQ 5 El B OLL am 0 TOP q <€ 12 HEIG wz — p- a F= WW =3 ck� W CL C) Elf - CL 0: M WEST ELEVATION ,SOUTH ELEVATION. Akppl,Kmidan Ndnuhbs� L ate EAST, ELEVATION Adamo & Associates, Inc. STRUCTURAL ENGINEERS 21060 Homestead Road Suite #120 Cupertino, Cal[famla 05014 T408.523.1200 F 408.523.122D ISSUE: Delta Description Date: SUBMITTAL 06.29.2016 RE—SUBMITTAL 10.13.2016 TITLE 10206 & 10208 ORANGE AVENUE CUPERTINO, CA Sheet'flfle 10208 ORANGE AVENUE CONCEPTUAL ELEVATIONS Stamp 'R\0FES S D.. qa co CD S2907 LU EXP. 9-3D-17 Job Number 16026 Scale AS NOTED Drawn By TA Review By TA Sheet Number Of XXX Sheets