TUP-2017-06 Signed Action Letter.pdfCITY OF CUPERTINO 10300 Torre Avenue, Cupertino, California 95014 (408) 777-3308 To: Mayor and City Council Members Chairman and Planning Commissioners From: Benjamin Fu, Assistant Director of Community Development Prepared by: Erika Poveda, Assistant Planner Date: November 20, 2017 Subject: Director's Temporary Use Permit, TUP-2017-06, to allow for a 300kW temporary generator for a one (1) week period to facilitate the maintenance of an existing, permanent generator at an existing office building (Apple) at 10101 N. De Anza Boulevard. Chapter 19.12.030 of the Cupertino Municipal Code allows for administrative approval of a temporary use permit, authorizing the use of a site in any zoning district for a temporary use. The Director reports his/her decision to the City Council & Planning Commission in time to allow an appeal of the decision within fourteen calendar days. The applicant, Daniel Stitt, on behalf of Redwood Electric Group, is requesting approval for the placement of a temporary generator located in the corner of the underground parking garage ramp of the subject property from December 16, 2017 to December 23, 2017. The temporary generator will be used as a central power source during upcoming maintenance on the existing, permanent power generator at this location. DISCUSSION Apple, Inc. occupies the existing office building located on the west side of N. De Anza Boulevard. The property is bounded by Alves Drive to the north, Stevens Creek Boulevard to the south, and Bandley Drive to the west. The surrounding land uses are predominantly commercial and office uses to the north, south, east, and west as well as low -density residential to the northeast and medium -density residential to the northwest. The applicant proposes a portable, trailer -mounted 400-gallon tank diesel generator that is self- contained in a sound -reducing enclosure with locked doors. The temporary generator with trailer measures eight (8) feet wide, 21 feet long, and 9.5 feet high. A ' ' rail barrier will be provided around the generator. TUT-2017-06 10101 N. De Anza Boulevard As proposed, the temporary generator will be located on the eastern corner of the existing parking garage ramp at the northern end of property. The temporary generator will be located outside of the drive aisle and shall not adversely impact garage traffic. The temporary generator will not be visible from N. De Anza Boulevard given that the parking garage ramp is approximately 15 feet below ground level. Existing plantings surrounding the parking ramp will further screen the proposed temporary generator from public view. No significant noise impacts are anticipated as the equipment is housed in a sound -reducing enclosure and is located approximately 250 feet away from the closest residential use. ACTION The Director of Community Development deems this application as minor, and approves the temporary power generator subject to the following conditions of approval. 1. APPROVED PROJECT This approval is based on the plan set entitled "Apple Inc. De Anza 4.1" consisting of one (1) sheet (ES-1) and associated technical specifications consisting of three (3) documents (A040U609, Rental Power WOW, and Enclosures and Tanks 250-1000kW gensets) stamped as received November 13, 2017, except as may be amended by the following conditions. 2. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions set forth shall be attached to, incorporated into, or annotated on the first page of the building plans. 3. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including, but not limited to, property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any project data may invalidate this approval and require additional review. 4. BUILDING PERMIT REQUIRED Issuance of a building permit shall be required prior to installation of proposed equipment and facilities. 5. DURATION OF TEMPORARY GENERATOR The temporary generator shall be located on site as indicated on the approved plan for up to two (2) weeks. The temporary use permit approval will expire six (6) months from the date indicated on this letter. 6. NOISE Noise shall not exceed the maximum Daytime and Nighttime exposure limits prescribed in Chapter 10.48 of the City of Cupertino Municipal Code. TUT-2017-06 10101 N. De Anza Boulevard Paee 3 7. CONSULATION WITH OTHER DEPARMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 8. INDEMNIFICATION Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the "indemnified parties") from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys fees and costs within 30 days following receipt of invoices from City. Such attorneys' fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 9. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90- day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. This approval of the temporary use permit is effective November 20, 2017. The 14 calendar day appeal period will expire on December 4, 2017 at 5:00pm. Attachments: Attachment 1 - Plan set with technical specifications