HomeMy WebLinkAboutAH Summary 10-26-2017OFFICE OF COMMUNITY DEVELOPMENT
CITY HALL
10300 TORRE AVENUE < CUPERTINO., CA 95014-3255
(408) 777-3308 o FAX (408) 777-3333. planning@cupertino.org
To: Mayor and City Council Members
Planning Commissioners
From: Benjamin Fu, Assist. Director of Community Development
Date: October 30, 2017
Subj: REPORT OF ADMINISTRATIVE HEARING DECISION MADE
October 26, 2017
Chapter 19.12.170 of the Cupertino Municipal code provides for
Avveal' of decisions made at an Administrativehearing
1. Application
ASA -2017-05, TR -2017-39, Whitney Marr (C&L Investments, LLC), 21020 Homestead Rd
Description
Major Architectural and Site Approval to allow for the demolition of an existing single -story
6,000 square feet multi -tenant commercial building and to allow for the construction of a new
single -story 4,178 square feet Bank of America branch building and ancillary parking lot
improvements, landscaping, and frontage and street improvements including a paved plaza area
at the intersection of Homestead and North Stelling Roads; Tree Removal Permit to allow the
removal and replacement of fourteen protected trees
Action
The application was approved at the Administrative Hearing. The approval is effective October
26, 2017. The fourteen -calendar day appeal will expire on November 9, 2017.
Enclosures:
Administrative Hearing Report of October 26, 2017
Resolution No(s) 82 & 83
Plan set
CUPERTINO
SUBJECT
OFFICE OF COMMUNITY DEVELOPMENT
PLANNING DIVISION
CITY HALL
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3308 • FAX (408) 777-3333
ADMINISTRATIVE HEARING STAFF REPORT
Agenda Date: October 26, 2017
Architectural and Site Approval to consider the construction of a new 4,172 square feet
Bank of America branch building to replace an existing 5,265 square feet multi -tenant
commercial building, including associated site and street frontage improvements
including a paved plaza area at the northeast corner of the site and a Tree Removal Permit
to allow for the removal of 14 protected trees; (Application No(s).: ASA -2017-05 and TR -
2017 -39; Applicant(s): Whitney Marr (Gensler); Location: 21020 Homestead Road;
APN(s): 326-07-020)
RECOMMENDED ACTION
That the Hearing Officer:
1. Find that the proposed actions are exempt from CEQA; and
2. Adopt the resolutions to approve the Architectural and Site Approval and Tree
Removal permits in accordance with the draft resolutions (Attachments 1 and 2).
DISCUSSION
Project Data:
General Plan Designation:'
Commercial
Special Area:
Stelling Gateway in the Homestead Special Area
Zoning Designation:
P(CG) Planned Development (General Commercial)
Existing
Proposed
Lot Size:
25,422 sq. ft.
24,163 sq. ft. (1,259 sq. ft.
dedicated to the City)
Floor Area and Use:
5,265 sq. ft. multi -tenant
commercial building
4,172 sq. ft. bank branch
ASA -2017-05 21020 Homestead Road (Bank of America) October 26, 2017
TR -2017-39 Page 2
Setbacks
Required
Proposed
Front:
Based on GP policies and adequate for light,
air and visibility. GP requires a 1:1 height to
setback ratio from curb on Homestead Rd.
22'-6"
Street Side:
None required
25'
Interior Side:
None required
50'
Rear:
None required
74'
Parking
Auto Parking:
17 spaces
33 spaces
Bicycle Parking:
4 spaces
4 spaces
Maximum
Proposed
Height:
30'
22'
Project Consistency with
General Plan:
Yes
Zonin :
Yes
Environmental
Assessment:
Categorically Exempt per Section 15302, Class 2 (Replacement
or Reconstruction) of California Quality Act (CEQA)
Background:
Site Description
The project site is located within the Homestead Special Area in the Stelling Gateway on
the southwest corner of Homestead and N. Stelling Roads. The Stelling Gateway is
located close to city limits, with the City of Sunnyvale located on the north side of
Homestead Road and the City of Cupertino on the south. The land uses surrounding the
intersection are mainly commercial and retail uses in both jurisdictions with the closest
residences to the subject property more than 300 feet to the northeast. The Homestead
Special Area, which extends from N.
Blaney Ave. on the east to Noranda
Dr. (west of N. Stelling Rd.) on the
west, is intended to continue as a
predominantly mixed-use area with
residential uses and neighborhood
centers providing services to local
residents.
The property is bounded on the
west and to the south by the lands of
Valley Church of Santa Clara
County; to the north by a
ASA -2017-05 21020 Homestead Road (Bank of America) October 26, 2017
TR -2017-39 Page 3
commercial center located in the City of Sunnyvale, with an Orchard Supply Hardware,
CVS Pharmacy, Taco Bell and several restaurant and retail tenants; to the northeast by a
SpeeDee Oil Change and Auto Service building; and to the east by a commercial center
with several restaurant tenants, a McDonald's restaurant, and a bowling alley
(Homestead Lanes). Most of the properties surrounding the subject site are developed
with single story buildings.
The site currently has a single -story multi -tenant commercial building constructed in
1980 with three tenants: a beauty salon, a massage therapy office, and a chiropractor
office.
Application Requests
The applicant is seeking to construct a new Bank of America branch building to replace
the existing building on the site. The proposed use is a permitted use in this zoning
district, therefore no Conditional Use Permit is required. However, an Architectural and
Site Approval permit is required in order to approve the architecture and associated site
improvements, including re -pavement of the parking lot, re -landscaping at the site,
construction of a plaza at the northeast corner of the property, and a new trash enclosure
to service the center. The improvements include the removal of 14 existing protected trees
for which a Tree Removal permit is required. The application also includes a
comprehensive site -wide tree replacement plan in conjunction with the proposed new
building, landscaping, and off-site improvements.
While the Tree Removal Permit may be approved by the Director of Community
Development without a public meeting, the zoning code requires review by the highest
approval authority when applications are combined. Therefore, the permit must be
reviewed concurrently with the Architectural and Site Approval permit at an
Administrative Hearing.
Signage is not approved as part of this proposal. Therefore, any future signs must be
approved through a sign permit or a Master Sign Program. Additionally, the property is
located in a zone where all fencing must be reviewed and approved by the City prior to
installation. Therefore, any existing unpermitted fencing will be required to be removed
and any new proposal for fences will need additional staff review.
Analysis:
The applicant team has worked extensively with staff to address policies in General Plan:
Community Vision 2015-2040 such as site planning, building and parking location,
building layout, street interfaces, reduced driveway openings, shared and consolidated
driveway access, sidewalk and street frontage landscaping, pedestrian -oriented public
spaces, and public art.
ASA -2017-05 21020 Homestead Road (Bank of America)
TR -2017-39
Site Planning and Architectural Design
October 26, 2017
Paize 4
The proposal maintains the general building location and parking lot configuration as it
currently exists, with the building located at the northeast portion of the property, and
the parking located at the rear of the building. The proposal locates the business entrance
close to the street to enhance the street interface and to provide a safe entry point for
pedestrians accessing the building from the public sidewalks. Pedestrian activity is
promoted at the site by maximizing window openings along both street frontages and
placing a plaza at the corner of the parcel (further described below). Additionally, special
paving leading up to the bank from the parking lot also helps to improve pedestrian
experience and access from the primary parking lot.
The building is proposed with smooth stucco finish throughout, aluminum metal
paneled canopy over select areas, and clear windows spanning the northern and eastern
elevations where offices and entrances are located. The southern and western portions of
the building, where the back -of -office facilities are located, face the L-shaped parking lot.
Since these walls are largely void of any fenestrations, lattices and vine landscaping have
been added at the city's consultant architect's recommendation.
The proposed automatic teller machines (ATM) are located within a card -protected 24-
hour vestibule located at the southeast portion of the building and visible from N. Stelling
Road. The lighting for areas around ATMs are required by the Cupertino Municipal Code
to be in conformance with the minimum standards required by the State of California
Business and Professions Code and will be further reviewed prior to issuance of building
permits.
Plaza
The Cupertino General Plan sets goals to promote public spaces that enhance community
identity and character (Policy LU -2.2: Pedestrian -Oriented Public Spaces) and developments
are required to incorporate pedestrian -scaled elements along the street to meet such
goals. While the architectural consultant recommended that the employee area located at
the southwest corner of the building include additional design elements for more
usability and higher visual quality and serve as a gathering spot, no changes have been
made in this area due to the bank's need to maintain the area clear of any visual
obstructions or barriers to address security concerns. The provision of the plaza at the
northeast corner as the public side/face of the site is an acceptable alternative. The
proposed plaza serves as an enhanced public amenity and is designed with ground -level
decorative pavers and concrete seat -walls with precast stone veneers, but has limited
landscaping.
The architectural consultant recommends adding tall shade trees at the corner similar to
those on the SpeeDee site in the City of Sunnyvale and adding a public art piece. No
ASA -2017-05 21020 Homestead Road (Bank of America) October 26, 2017
TR -2017-39 Pa Lye 5
public art piece has been proposed by Bank of America since it appears that previous
issues with controversial art has led to a corporate policy that limits the ability to include
art pieces such as, murals or sculptures. Additionally, no changes were made to the plans
to add shade trees at the plaza. A condition of approval has been added to require the
planting of a medium-sized shade tree to the satisfaction of the City in consultation with
the City's consulting arborist and the integration of small landscape areas closest to the
right of way and/or planter pots within the plaza area.
Landscaping & Trees
As part of the on-site improvements, the proposal includes removal of 14 existing
development (protected) trees that were determined to be unsuitable for retention due to
decline in health, poor horticultural care and maintenance practices, conflict with
proposed street improvements, and species incompatibility with newly proposed storm
water infiltration areas. In order to mitigate the removal of the trees, the applicant team
proposes to plant five Red Maples (Acer rubrum), two Zelkovas (Zelkova serrulata), and
nine Crape Myrtles (Lagerstroemia spp.).
The replacement trees are dispersed throughout the site: within the newly proposed
water infiltration areas adjacent to parking, along the front and street side setbacks along
the street frontages and in the plaza area as conceptualized in the landscape plan
(Attachment 3). While the tree replacements will increase the limited existing canopy
coverage, the proposed species will need to be evaluated as sufficient shade trees in
conformance with General Plan policies (Strategies ES -2.1.5: Urban Forest and ES -5.1.2:
Built Environment). The conditions of approval regarding landscaping include provisions
to ensure that the final landscape plan indicate additional ground cover in the area
adjacent to the intersection where paving is proposed and that the final species of
replacement trees be reviewed and approved by the City in consultation with the City's
Consulting Arborist prior to issuance of building permits.
Parking and Circulation
The development provides 33 parking spaces (16 auto parking spaces more than
required) and 4 bicycle parking spaces in compliance with the City's Parking Ordinance.
As mentioned previously, the parking is located at the rear of the building to ensure that
driveway approaches are spaced appropriately away from the intersection as well as to
promote active street frontages. Furthermore, the bicycle parking is conveniently located
at the entrance of the bank building facing and adjacent to North Stelling Road, where a
Class IV separated bike lane is envisioned in the Cupertino Bicycle Transportation Plan.
There are two driveways located within 50 feet of each other on Homestead Rd, one
serving the subject site and one serving the adjacent property (Valley Church). The
Cupertino General Plan sets a goal of improving walkability and bikeability and, to that
ASA -2017-05 21020 Homestead Road (Bank of America) October 26, 2017
TR -2017-39 Page 6
end, identifies policies to further this goal. One of the qq,i� AMM W
policies, Policy M-3.5: Curb Cuts states "Minimize the
number and the width of driveway openings" and also
encourages the shared use of driveways where feasible and —
authorizes driveway closures, consolidations or both when lµ�,
a site is redeveloped or remodeled (Strategy M-3.5.1: Shared,:
Driveway Access).The proposal was reviewed for
conformance with these policies and strategies and it was
determined that the two driveways should be consolidated
to improve safety and walkability.
SHARED DRIVEWAY CONCEPT
The applicant is agreeable to working with the property –
owners of Valley Church to reduce the number of driveway cuts along Homestead by
consolidating the existing driveways (indicated in red in Shared Driveway Concept) and
utilizing shared driveway access. Discussions were initiated for pursuing the driveway
consolidation and during preliminary discussions, it was determined that the shared
driveway would lie where currently there is a PG&E electric junction box, and fiber optic
lines and meters. Due to the anticipated time that would be required to engage with and
receive approvals with the appropriate utility providers, it was agreed that consolidation
for the driveway on Homestead Road could be deferred to a later time and would not
need to be included in this scope of work.
However, it was agreed that in the interim, the applicant would reduce the width of the
driveway off of Homestead Road to 24 feet for a safer pedestrian and bicycle street
interface. This has been indicated on the proposed plans. A condition of approval has
been added that if the applicant is unable to obtain a building permit to implement the
shared driveway prior to final occupancy, a covenant shall be recorded instead, to
memorialize the agreement to consolidate the western driveway and to record
appropriate ingress/egress easements for access, at a time when the City can require the
same of the adjacent property.
Street Improvements
Off-site improvements consisting of sidewalk, curb, and driveway (discussed above)
work will be required with this project. Currently, a monolithic sidewalk is located along
the property's street frontages but as part of off-site improvements it will be replaced
with a detached sidewalk to the satisfaction of the Director of Public Works. Furthermore,
the pedestrian curb ramp at the intersection of Homestead and N. Stelling Roads will be
reconfigured and a traffic signal pole will be relocated. In addition, a dedication of land
of up to 10 feet in width along the project frontage, to the satisfaction of the Director of
Public Works, is required.
ASA -2017-05
TR -2017-39
Environmental Review
21020 Homestead Road (Bank of America) October 26, 2017
Paye 7
This project is categorically exempt from the requirements of the California
Environmental Quality Act (CEQA) per Section 15302 — Replacement or Reconstruction
because the exemption applies to the replacement or reconstruction of existing structures
and facilities where the new commercial structure will be located on the same site as the
structure replaced and will have substantially the same size, purpose, and capacity as the
structure replaced.
Other Department/Agency Review
The City's Public Works Department; Building Division; Environmental Programs
Division; the Santa Clara County Fire Department; Cupertino Sanitary District; and
Recology reviewed the request and have no objections to the project. Their pre -hearing
comments have been incorporated as conditions of approval in the draft resolutions.
PUBLIC NOTICING AND COMMUNITY OUTREACH
The following table is a brief summary of the noticing for this project:
Notice of Public Hearing
A enda
■ Site Signage (at least 14 days prior to
■ Posted on the City's official notice
hearing)
bulletin board (five days prior to
■ 8 notices mailed to property owners
hearing)
adjacent to the project site (at least 10 days
■ Posted on the City of Cupertino's
prior to the hearing)
Web site ve days prior to hearing)
As of October 19, 2017, staff has received comments from four people. Written public
comments are included as Attachment 4.
Two people stated that they were opposed to the proposed development as they were
patrons of Happy Cuts which they wished to remain at the site.
A member of the public shared their confusion on the necessity of another bank branch
particularly when replacing an existing fully -tenanted commercial building that provides
the community with personal services and felt a bank branch would be better located in
an area that can be easily accessed by foot like a shopping mall. Furthermore, they shared
concerns with regard to the tree removal and proposed landscaping plans.
Another member of the public verbally expressed concerns about the traffic impact of
additional construction on Homestead Road stating that it is very inconvenient for the
community and that left turns out of the development are dangerous.
ASA -2017-05 21020 Homestead Road (Bank of America) October 26, 2017
TR -2017-39 Page 8
PERMIT STREAMLINING ACT
This project is subject to the Permit Streamlining Act (Government Code Section 65920 —
65964). The City has complied with the deadlines found in the Permit Streamlining Act.
Project Received: May 26, 2017; Deemed Incomplete: June 26, 2017
Revisions Received: August 31, 2017; Deemed Incomplete: September 28, 2017
Revisions Received: October 11, 2017; Deemed Complete: October 11, 2017
Since this project is Categorically Exempt, the City has 60 days (until December 11, 2017)
to make a decision on the project.
CONCLUSION
Staff recommends approval of the Architectural and Site Approval and Tree Removal
Permits, since the plans and conditions of approval address all concerns related to the
proposed project. Additionally, all of the findings for approval of the proposed project,
consistent with Chapters 14.18 and 19.168 of the Cupertino Municipal Code, may be made
as reflected in the Draft Resolutions.
NEXT STEPS
The permit will be effective 14 calendar days from the date of the hearing. The decision
of the Administrative Hearing Officer is final, unless appealed within 14 calendar days
from the date of the hearing. The applicant team may apply for building and/or other
permits with the City at the end of the appeal period.
This approval is valid until October 26, 2019. The applicant team may apply for a one-
time one year extension before the approval expires.
Prepared by: Ellen Yau, Assistant Planner
Approved by: Piu Ghosh, Principal Planner
ATTACHMENTS
1. Draft Resolution for ASA -2017-05
2. Draft Resolution for TR -2017-39
3. Plan Set
4. Written Public Comments
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION NO. 82
OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO
.....--- ---- - ..._- -- - ---
TO CONSIDER THE CONSTRUCTION OF A NEW 4,172 SQUARE FEET BANK OF
AMERICA BRANCH BUILDING TO REPLACE AN EXISTING SINGLE -STORY
5,265 SQUARE FEET MULTI -TENANT COMMERCIAL BUILDING, INCLUDING
ASSOCIATED SITE AND STREET FRONTAGE IMPROVEMENTS INCLUDING A
PAVED PLAZA AREA AT THE NORTHEAST CORNER OF THE SITE AT 21020
HOMESTEAD ROAD.
SECTION I: PROTECT DESCRIPTION
Application No.: ASA -2017-05
Applicant: Whitney Marr (C&L Investments, LLC)
Location: 21020 Homestead Road APN #326-07-020
SECTION II: FINDINGS
WHEREAS, the Administrative Hearing Meeting of the City of Cupertino received an
application for a new 4,172 square feet Bank of America branch building to replace an
existing single -story 5,265 square feet multi -tenant commercial building, including
associated site and street improvements, including a paved plaza area at the northeast
corner of the site; and
WHEREAS, the projects is categorically exempt from the California Environmental
Quality Act (CEQA);
WHEREAS, the necessary public notices have been given as required by the Procedural
Ordinance of the City of Cupertnlo, and the Administrative Hearing Officer has held at
least one public meeting �inregard to the application;
WHEREAS, the appli
application; and
has met the burden of proof required to support said
WHEREAS, the Administrative Hearing Officer finds:
Resolution No. 82 ASA -2017-05 October 26, 2017
Page 2
1. The proposal, at the proposed location, will not be detrimental or injurious to
property or improvements in the vicinity, and will not be detrimental to the public
health, safety, general welfare, or convenience;
The proposal maintains the general building location and parking lot configuration as it
currently exists, with the building located at the northeast portion of the property, and the
parking located at the rear of the building. The project proposal will not be detrimental or
injurious to property or improvements in the vicinity, and will not be detrimental to the
public health, safety, general welfare, or convenience. The project would be required to detach
the existing monolithic sidewalk along the property's street fton This would improve the
pedestrian experience and safety. The proposal also includes mitigations to reduce the width
of existing two-way driveway curb cuts which would further enhance the site and ameliorate
impacts to pedestrians and bicyclists.
2. The proposal is consistent with the purposes of Chapter 19.168, Architectural and
Site Review, of the Cupertino Municipal Code, the General Plan, any specific plan,
zoning ordinances, applicable planned development permit, conditional use
permits, variances, subdivision maps or other entitlements to use which regulate the
subject property including, but not limited to, adherence to the following specific
criteria:
a) Abrupt changes in building scale should be avoided. A gradual transition related to
height and bulk should be achieved between new and existing buildings;
Most of the properties surrounding the subject site are developed with single story buildings
and the proposed building maintains the single -story scale and increases to the height of the
building are primarily to incorporate parapets in order to screen anticipated rooftop
equipment. Additionally, the mass of the building is accentuated with a combination of wall
articulation, decorative cornices, metal awnings, and significant window fenestration.
Furthermore, the proposed changes to the height of the structure are within the regulations
established in the General Plan: Community Vision 2015-2040.
b) In order to preserve design harmony between new and existing buildings and in
order to preserve and enhance property values, the materials, textures and colors of
new buildings should harmonize with adjacent development by being consistent or
compatible with design and color schemes, and, with the future character of the
neighborhood and purposes of the zone in which they are situated. The location,
height and materials of walls, fencing, hedges and screen planting should harmonize
with adjacent development. Unsightly storage areas, utility installations and
unsightly elements of parking lots should be concealed. The planting of ground cover
or various types of pavements should be used to prevent dust and erosion, and the
Resolution No. 82 ASA -2017-05 October 26, 2017
Page 3
unnecessary destruction of existing healthy trees should be avoided. Lighting for
development should be adequate to meet safety requirements as specified by the
engineering and building departments, and provide shielding to prevent spill-over
light to adjoining property owners;
The newly proposed architectural design, materials, finishes, and textures will be consistently
applied to the entire building facade to allow for four-sided complete architectural integrity
- - - acid --will- be -compatible'.with -the character of - the - neighborhood as -a mix of -commercial and - -
residential -scaled design. The proposal includes no changes to the location, height, and
materials of walls and fencing. Any unpermitted fencing will he removed as part of this
development. Landscaping is being proposed to soften the edges of the development., to enhance
on-site amenities, provide relief on building walls, and are intended to harmonize with
adjacent property through the installation of adequate amounts of groundcover and shade
trees throughout. Furthermore, the proposal includes the construction of a trash enclosure at
the rear of the parking lot which will conform to the City's requirements to screen and shelter
waste collection bins.
c) The number, location, color, size, height, lighting and landscaping of outdoor
advertising signs and structures shall minimize traffic hazards and shall positively
affect the general appearance of the <neighborhood and harmonize with adjacent
development; and
No signage is approved as part of this proposal..
d) With respect to new projects within existing residential neighborhoods, new
development should be designed to protect residents from noise, traffic, light and
visually intrusive effects by use of buffering, setbacks, landscaping, walls and other
appropriate design measures
The proposal is a new development that maintains the general scale, building location, and
parking lot configuration as it currently exists. This development is not within all existing
residential neighborhood. Therefore, this finding does not apply. However, the proposed
landscaping and tree plantings aground the parking lot, street f ontages, and in the public
plaza will provide visual buffering of the buildings and will enhance the tree canopy coverage
on-site, and protect the closest residents, that are located 300 feet northeast of the subject site,
f om visually intrusive effects.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence
submitted in this matter, Ithe Application No. ASA -2017-05, is hereby approved; and
Resolution No. 82 ASA -2017-05 October 26, 2017
Page 4
That the subconclusions upon which the findings and conditions specified in this
Resolution are based and contained in the public meeting record concerning
Application No. ASA -2017-05 as set forth in the Minutes of the Administrative Hearing
Meeting of October 26, 2017, and are incorporated by reference herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the plan set titled "Bank of America Homestead Road New
Store" dated 10/18/17 drawn by Gensler consisting of eleven (11) sheets labeled
"A00.50, A00.51, A00.52, A00.53, A09.11, A09.15, L.01, L.02, E-0.0, Sheet 1 of 1, and
C.1, except as may be amended by conditions in this resolution.
2. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file no. TR -2017-39 shall be applicable to
this approval.
3. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the
building plans.
4. ACCURACY OF PROTECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks,
property size, building square footage, any relevant easements and/or construction
records. Any misrepresentation of any property data may invalidate this approval
and may require additional review.
5. REQUIRED TRAFFIC SIGNAGE
The property owner will be required to install and maintain a "No Right Turn" sign
for the N. Stelling Road driveway. The sign must be located on private property. The
final location and content of the sign will be reviewed by the City's Traffic Engineer
prior to building permit issuance.
6. DEMOLITION REQUIREMENTS
All demolished building and site materials shall be recycled to the maximum extent
feasible, in accordance with the City's Recycling and Diversion of Construction and
Demolition Waste under Chapter 16.72 of the Cupertino Municipal Code. The
Resolution No. 82 ASA -2017-05 October 26, 2017
Page 5
applicant' shall provide evidence that materials were recycled prior to issuance of
final demolition permits.
7. LIGHTING
On-site lighting must be in conformance with Cupertino Municipal Code Chapter
19.60 and automatic teller machine lighting, specifically, shall meet minimum
standards required by the State of California Business and Professions Code.
8. GREENSCREENS
The applicant will be required to install and maintain the green screens along the
western and southern walls as indicated on pages A09.11, L0.1 and L0.2 of the
approved exhibits.
9. FENCING
The applicant will be required to remove all unpermitted fencing to the satisfaction
of the Director of Community Development prior to issuance of building permits.
10. ARBORIST REVIEW
Prior to building permit issuance, an arborist review will be required as listed in the
conditions of approval contained in file no. TR -2017-39.
11. LANDSCAPE DOCUMENTATION PACKAGE
Prior to issuance of building permits, the applicant shall submit a full Landscape
Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape
Ordinance. The Landscape Documentation Package shall be reviewed and approved
to the satisfaction of the Director of Community Development prior to issuance of
building permits, and additional requirements, per sections 14.15.050 E, F, G, H,_ aild
I will be required to be reviewed and approved prior to final inspections.
i
12. LANDSCAPE AND IRRIGATION PLANS
The applicant shall submit detailed landscape and irrigation plans to be reviewed
and approved by the Directors of Community Development and Public Works or
his/her designee prior to issuance of building permits. The landscape plan shall
include water conservation and pesticide reduction measures in conformance with
Chapter 14.15, Landscape Ordinance, and the pesticide control measures referenced
in Chapter 9.18, Stormwater Pollution Prevention and Watershed Protection, of the
Cupertino Municipal Code and shall also be amended to ensure that:
a. Additional landscaping in the area closest to the right of way is incorporated
through ground -level landscaping and/or in. appropriately sized planter pots
within the plaza area. The landscape planter box, fencing, landscaping, irrigation
Resolution No. 82 ASA -2017-05 October 26, 2017
Page 6
and/or plaza area design shall be reviewed and approved by the Director of
Community Development prior to issuance of building permits; and
b. A medium sized shade tree is planted at the plaza area subject to review and
approval by the City in consultation with the City's Consulting Arborist; and
c. The final list of replacement trees is approved by the City in consultation with
the city's consulting arborist to reduce the number of crape myrtle trees
proposed as replacement trees.
13. LANDSCAPE AND IRRIGATION MAINTENANCE
Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall
be established and submitted to the Director of Community Development or his/her
designee, either with the landscape application package, with the landscape
installation report, or any time before the landscape installation report is submitted.
a) Schedules should take into account water requirements for the plant
establishment period and water requirements for established landscapes.
b) Maintenance shall include, but not be limited to the following: routine
inspection; pressure testing, adjustment and repair of the irrigation system; aerating
and de -thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of
failed plants; weeding; pest control; and removing obstructions to emission devices.
c) Failed plants shall be replaced with the same or functionally equivalent plants
that may be size -adjusted as appropriate for the stage of growth of the overall
installation. Failing plants shall either be replaced or be revived through appropriate
adjustments in water, nutrients, pest control or other factors as recommended by a
landscaping professional.
14. LANDSCAPE AND IRRIGATION INSTALLATION REPORT
The project is subject to all provisions delineated in the Landscape Ordinance (CMC,
Chapter 14.15). A landscape installation audit shall be conducted by a certified
landscape professional after the landscaping and irrigation system have been
installed. The findings of the assessment shall be consolidated into a landscape
installation report.
The landscape installation report shall include, but is not limited to: inspection to
confirm that the landscaping and irrigation system are installed as specified in the
landscape and irrigation design plan, system tune-up, system test with distribution
uniformity, reporting overspray or run-off that causes overland flow, and
preparation of an irrigation schedule.
Resolution No. 82 ASA -2017-05 October 26, 2017
Page 7
The landscape installation report shall include the following statement: "The
landscape and irrigation system have been installed as specified in the landscape
and irrigation design plan and complies with the criteria of the ordinance and the
permit."
15. DRIVEWAY CONSOLIDATION AND INGRESS/EGRESS EASEMENT.
Should__-._the...._applicant..._ not._ _obtain appro_pnate_ building. _permits. _ and._._ record
appropriate easements for consolidation of the west driveway off of Homestead
Road prior to issuance of building permits for the bank building, prior to final
occupancy, the applicant shall record a covenant (or whichever legal, ;document
deemed appropriate by the City) agreeing to consolidate the existing driveway off of
Homestead Road and record an appropriate Reciprocal Access Easement over
portions of the property for shared driveway access. The nonexclusive easement
shall provide vehicular and pedestrian ingress and egress over the area for shared
driveway access. The easement language shall provide that construction of the
driveway shall be completed/connected to the City's satisfaction at such time as the
city can require the adjacent property owner to. agree to consolidate the driveway
and provide a reciprocal ingress/egress easement through a planning permit. The
agreement language including the driveway and easement layout shall be reviewed
and approved by the City prior to recordation with the County Recorder's Office.
The easement shall contain a provision that it may not be modified or removed
without express written approval from the City.
16. SCREENING
All mechanical and other equipment on the building or on the site shall be screened
so they are not visible from public street areas or adjoining developments. Screening
materials/colors shall match building features and materials. The height of the
screening shall be taller than the height of the mechanical equipment that it is
designed to screen. The location of. equipment and necessary screening shall be
reviewed and approved
17. UTILITY STRUCTURE PLAN
Prior to issuance of building permits, the applicant shall work with staff to provide a
detailed utility plan to demonstrate screening or undergrounding of all utility
structures [including, but not limited to backflow preventers (BFP), fire department
connections (FDC), post -indicator valves (PIV), and gas meters] to the satisfaction of
the Director of Community Development, Public Works, Fire Department, and
applicable utility agencies.
Resolution No. 82 ASA -2017-05 October 26, 2017
Page 8
18. WINDOW DETAILS
The frontage windows shall be kept open and transparent to the greatest extent
possible. The final storefront design and window display shall be reviewed and
approved by the Director of Community Development prior to issuance of building
permits for tenant improvements. No changes shall be made to the transparency of
the windows without the express approval of the Director of Community
Development.
19. EXTERIOR BUILDING MATERIALS/TREATMENTS
The final building exterior plan shall closely resemble the details shown on the
original approved plans. Final building exterior treatment plan (including but not
limited to details on exterior color, materials, architectural treatments, doors,
windows, lighting fixtures, and/or embellishments) shall be reviewed and approved
by the Director of Community Development prior to issuance of building permits to
ensure quality and consistency. Any exterior changes determined to be substantial
by the Director of Community Development shall either require a modification to
this permit or a new permit based on the extent of the change.
20. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
21. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant to
Government Code Section 66020(d) (1), these Conditions constitute written notice of
a statement of the amount of such fees, and a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90 -day
approval period in which you may protest these fees, dedications, reservations, and
other exactions, pursuant to Government Code Section 66020(a), has begun. If you
fail to file a protest within this 90 -day period complying with all of the requirements
of Section 66020, you will be legally barred from later challenging such exactions.
Resolution No. 82 ASA -2017-05 October 26, 2017
Page 9
NDITI
DEPARTMENT
22. TRAFFIC IMPA
BY THE PUB
The Project may be subject to pay Traffic Impact Fees. The fee is currently estimated
to be set at $7,000 per new AM or PM peak -hour trip generated by the Project subject
to be approved by the City Council in August 2017.
23. STREET IMPROVEMENTS & DEDICATION
Provide a dedication and frontage improvements along the project frontage to the
satisfaction of the Director of Public Works. Street improvements may include, but
not be limited to, new detached sidewalk, new ADA ramp, driveways, storm drain
lateral, street tree installations, and street light and/or pedestrian push button
relocation.
24. PEDESTRIAN AND BICYCLE IMPROVEMENTS
Developer shall provide pedestrian and bicycle related improvements (e.g. walkway
and bicycle racks, etc.) consistent with the Cupertino Bicycle Transportation Plan
and the Pedestrian Transportation Guidelines, and as approved by the Director of
Public Works.
25. STREET LIGHTING INSTALLATION
Street lighting shall be installed and shall be as approved by the Director of Public
Works. Lighting fixtures shall be positioned.so as to preclude glare and other forms
of visual interference, to adjoining properties, and shall be no higher than the
maximum height permitted by the zone in which the site is located.
26. GRADING AND DRAINAGE
Grading shall be as 'approved and required by the Director of Public Works in
accordance with Chapter 16.08 of the Cupertino Municipal Code.
All storm drain inlets!, be clearly marked with the words "No Dumping — Flows
to Creek" using permanently affixed metal medallions or equivalent, as approved
by the Environmental Programs Division.
27. C.3 REQUIREMENTS
C.3 regulated improvements are required for all projects creating and/or replacing
10,000 S.F. or more of impervious surface (collectively over the entire project site).
The developer shall reserve a minimum of 4% of developable surface area for the
placement of low impact development measures, for storm water treatment, unless
Resolution No. 82 ASA -2017-05 October 26, 2017
Page 10
an alternative storm water treatment plan, that satisfies C.3 requirements, is
approved by the Director of Public Works.
The developer must include the use and maintenance of site design, source control
and storm water treatment Best Management Practices (BMPs), which must be
designed per approved numeric sizing criteria. A Storm Water Management Plan,
Storm Water Facilities Easement Agreement, Storm Water Facilities Operation and
Maintenance Agreement, and certification of ongoing operation and maintenance of
treatment BMPs are each required.
All storm water management plans are required to obtain certification from a City
approved third party reviewer.
28. IMPROVEMENT AGREEMENT
The project developer shall enter into a development agreement with the City of
Cupertino providing for payment of fees, including but not limited to checking and
inspection fees, storm drain fees, park dedication fees and fees for under grounding
of utilities. Said agreement shall be executed prior to issuance of construction
permits.
Fees:
a. Checking & Inspection Fees:
b. Grading Permit:
c. Development Maintenance
Deposit:
d. Storm Drainage Fee:
e. Traffic Impact Fee:
f. Power Cost:
g. Storm Management Plan
Fee:
h. Street Tree:
$ Per current fee schedule ($6,266.00 or
5% of improvement costs)
$ Per current fee schedule ($2,825.00 or
6% of improvement costs)
$1,000.00
$ Per current fee schedule ($8,790.00 per
AC)
$7,000 per new AM or PM peak -hour
trip
Per current fee schedule ($1,208)
By Developer
** Based on the latest effective PG&E rate schedule approved by the PUC
Bonds:
- Faithful Performance Bond: 100% of Off-site and On-site Improvements
- Labor & Material Bond: 100% of Off-site and On-site Improvement
- On-site Grading Bond: 100% of site improvements.
Resolution No. 82 ASA -2017-05 October 26, 2017
Page 11
The fees described above are imposed based upon the current fee schedule adopted
by the City Council. However, the fees imposed herein may be modified at the time
of recordation of a final map or issuance of a building permit in the event of said
change or changes, the fees changed at that time will reflect the then current fee
schedule.
29. TRASH, RECYCLYING AND COMPOST ENCLOSURES
Trash enclosure plans must be designed in accordance with the City's Public Works
Guidelines posted at www.cupertino.org/nowaste, and to the satisfaction of the
Environmental Programs Manager. Clearance by the Public Works Department is
required prior to obtaining a building permit (CMC 9.18.210 (H) & (K)).
30. OPERATIONS & MAINTENANCE AGREEMENT
Developer shall enter into an Operations & Maintenance Agreement with the City
prior to final occupancy. The Agreement shall include the operation and
maintenance for non-standard appurtenances in the public road right-of-way that
may include, but is not limited to, sidewalk, pavers, and street lights.
31. UNDERGROUND UTILITIES
Developer shall comply with the requirements of the Underground Utilities
Ordinance No. 331 and other related Ordinances, -and regulations of the City of
Cupertino, and shall coordinate with affected utility providers for installation of
underground utility devices. Developer shall submit detailed plans showing utility
underground provisions. Said plans shall be subject to prior approval of the
affected Utility provider and the Director of Public Works.
_ I
32. TRANSFORMERS
New electrical transformers, telephone cabinets and similar equipment shall be
placed in underground vaults. The developer must receive written approval from
both the Public Works Department and the Community Development Department
prior to installation of any above ground equipment. Should above ground
equipment be permitted by the City, equipment and enclosures shall be screened
with fencing and landscaping such that said equipment is not visible from public
street areas, as determined by the Community Development Department.
Transformers shall not be located n1 the front or side building setback area.
33. WATER BACKFLOW PREVENTERS
Domestic and Fire Water Backflow preventers and similar above ground equipment
shall be placed away from the public right of way and site driveways to a location
Resolution No. 82 ASA -2017-05 October 26, 2017
Page 12
approved by the Cupertino Planning Department, Santa Clara County Fire
Department and the water company.
34. BEST MANAGEMENT PRACTICES
Utilize Best Management Practices (BMPs), as required by the State Water Resources
Control Board, for construction activity, which disturbs soil. BMP plans shall be
included in grading and street improvement plans.
35. EROSION CONTROL PLAN
Developer must provide an approved erosion control plan by a Registered Civil
Engineer. This plan should include all erosion control measures used to retain
materials on site. Erosion control notes shall be stated on the plans.
36. WORK SCHEDULE
Every 6 months, the developer shall submit a work schedule to the City to show the
timetable for all grading/erosion control work in conjunction with this project.
37. TRAFFIC CONTROL PLAN
The developer must submit a traffic control plan by a Registered Traffic Engineer to
be approved by the City. The plan shall include a temporary traffic control plan for
work in the right of way as well as a routing plan for all vehicles used during
construction. All traffic control signs must be reviewed and approved by the City
prior to commencement of work. The City has adopted Manual on Uniform Traffic
Control Devices (MUTCD) standards for all signage and striping work throughout
the City.
38. STREET TREES
Street trees shall be planted within the Public Right of Way to the satisfaction of the
Director of Public Works and shall be of a type approved by the City in accordance
with Ordinance No. 125.
39. FIRE PROTECTION
Fire sprinklers shall be installed in any new construction to the approval of the City.
40. SANTA CLARA COUNTY FIRE DEPARTMENT
A letter of clearance for the project shall be obtained from the Santa Clara County
Fire Department prior to issuance of building permits. Clearance should include
written approval of the location of any proposed Fire Backflow Preventers, Fire
Department Connections and Fire Hydrants (typically Backflow Preventers should
be located on private property adjacent to the public right of way, and fire
department connections must be located within 100' of a Fire Hydrant).
Resolution No. 82 ASA -2017-05 October 26, 2017
Page 13
41. FIRE HYDRANT
Fire hydrants shall be located as required by the City and Santa Clara County Fire
Department as needed.
42. CALIFORNIA WATER SERVICE COMPANY CLEARANCE
Provide California Water Service Company approval for water connection, service
capability and location and layout of water lines and backflow preventers before
_ _
issuance of a building permit approval.
43. DEDICATION OF UNDERGROUND WATER RIGHTS
Developer shall "quit claim" to the City all rights to pump, take or otherwise extract
water from the underground basin or any underground strata in the Santa Clara
Valley.
44. SANITARY DISTRICT
A letter of clearance for the project shall be obtained from the Cupertino Sanitary
District prior to issuance of building permits.
45. UTILITY EASEMENTS
Clearance approvals from the agencieswith easements on the property (including
PG&E; AT&T, and California Water Company, and/or equivalent agencies) will be
required prior to issuance of building permits.
46. WASTE TRIO AND CIGARETTE BUTT URN
Waste trio and cigarette butt urn manufacturer specifications must be provided to
the Environmental Programs Division for review. Location of waste trio must be
located entirely on private property and in proximity to pedestrian use of the
sidewalk. Clearance by the Public Works Department is required prior to obtaining
a building permit.
47. STORM DRAINS
All exterior storm drain inlets on the parcel must be fitted with full trash capture
storm drain catch basin inlet devices to prevent litter from entering the storm drain
system. Devices installed must be approved by the California State Water Board and
selected from the San Francisco Bay Regional Water Quality Control Board list,
which can be viewed at http://-�vww.sfestuary.org/approved-trash-capture-dei7ices.
Please include with the resubmittal, the manufacturer specification sheet for all trash
capture device(s) included with the project. As a condition of approval, the devices
must be installed and maintained (cleaned)' in accordance with the manufacturer
specifications, but not less than two times per year. The property owner must
Resolution No. 82 ASA -2017-05 October 26, 2017
Page 14
provide official
request.
written record of cleaning and maintenance to the City upon
48. STORM DRAIN INLET MARKERS
All exterior storm drain inlets on the property shall be clearly marked with "No
Dumping Flows to Creek" or "No Dumping Flows to Bay" markers.
49. COPPER USES PROHIBITED
Copper metal roofing, copper granule containing asphalt shingles, copper gutters
and downspouts, and/or other exterior ornamental copper are not permitted for use
on any commercial or industrial building.
50. C&D WASTE MANAGEMENT PLAN
A completed C&D Waste Management Plan must be submitted at the time of
building permit issuance. If the applicant and/or their contractor and any
subcontractor working on the project self -hauls the C&D material, a Waste
Management Report must be submitted prior to final approval of the building
permit demonstrating a minimum of 65% of the C&D waste has been diverted from
landfill and recycled. Please note that C&D debris box service may only be obtained
from Recology, the City's franchised waste hauler. C&D Recycling information and
reports may be viewed at www.cupertino.org/greendev.
51. RECOLOGY REVIEW
The location, path of travel, and associated design features of the on-site trash
enclosure will be required to be reviewed by Recology, the City's franchised waste
hauler, and approved by the Public Works Department prior to building permit
issuance.
SECTION V: CONDITIONS ADMINISTERED BY THE BUILDING DEPT.
52. ACCESSIBLE PATH OF TRAVEL
The applicant shall provide accessible path -of -travel from the building to the trash
enclosure per 2016 California Building Code.
SECTION VI: CONDITIONS ADMINISTERED BY SANTA CLARA COUNTY FIRE
r)FPT
53. FIRE SPRINKLERS
Certain structures may require fire sprinkler coverage under exterior roof
overhangs. Such areas must be reviewed by a properly licensed contractor. If the fire
sprinkler system is to be modified, a State of California licensed (C-16) Fire
Protection Contractor shall submit plans, calculations, a completed permit
Resolution No. 82 ASA -2017-05 October 26, 2017
Page 15
application and appropriate fees to the Santa Clara County Fire Department for
review and approval ;prior to beginning their work.
i
54. CONSTRUCTION SITE FIRE SAFETY
All construction sites must comply with applicable provisions of our Standard
Detail and Specification SI -7 and Chapter 33 of the currently adopted edition of the
California Fire Code. This must be submitted to and approved by this office prior to
_ .. _
commencing any demolition/construction activities.
55. PUBLIC FIRE HYDRANT(S) REQUIRED
Identify the location of the existing public fire hydrant(s). Maximum hydrant
spacing shall be 500 feet, with a minimum single hydrant flow of 1,750 GPM at 20
psi, residual. Fire hydrants shall be provided along required fire apparatus access
roads and adjacent public streets within 100' of the fire department connection
(FDC).
56. WATER SUPPLY REQUIREMENTS
Potable water supplies shall be protected from contamination caused by fire
protection water supplies. It is the responsibility of the applicant and any
contractors and subcontractors to contact the water purveyor supplying the site of
such project, and to comply with the requirements of that purveyor. Such
requirements shall be incorporated into the design of any water-based fire
protection systems; and/or fire suppression water supply systems or storage
containers that may be physically connected in any manner to an appliance capable
of causing contamination of the potable water supply of the purveyor of record.
Final approval of the system(s) under consideration will not be granted by this office
until compliance with the requirements of. the water purveyor of record are
documented by that purveyor as having been met by the applicant(s).
57. ADDRESS IDENTIFICATION
New and existing buildings shall have approved address numbers, building
numbers or approved building identification placed in a position that is plainly
legible and visible from the street or road fronting the property. These numbers shall
contrast with their background. Address numbers shall be Arabic numbers or
alphabetical letters. Numbers shall be a minimum of 4 inches (101.6 mm) high with a
minimum stroke width of 0.5 inch (12.7 mm).
Resolution No. 82 ASA -2017-05 October 26, 2017
Page 16
PASSED AND ADOPTED this 26th day of October, 2017 at a noticed Public Meeting of
the Administrative Hearing Officer of the City of Cupertino, State of California, held by
the Director of Community Development, or his or her designee, pursuant to Cupertino
Municipal Code Section 19.12.120.
ATTEST:
/s/Ellen Yau
Ellen Yau
Assistant Planner
APPROVED:
/s/Benjamin Fu
Benjamin Fu
Asst. Director of Community Development
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION NO. 83
-- ._ --1- - - - -..I . .............. -- --- I_ ---------------- -- _1 --------- ------ --
OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO
TO ALLOW THE REMOVAL AND REPLACEMENT OF 14 PROTECTED TREES
TO FACILITATE THE CONSTRUCTION OF A NEW COMMERCIAL BANK
BRANCH AND ASSOCIATED SIDEWALK IMPROVEMENTS
AT 21020 HOMESTEAD', ROAD (APN 326-07-020)
SECTION I: PROTECT DESCRIPTION
Application No.: TR -2017-39
Applicant: Whitney Marr (C&L Investments, LLC)
Location: 21020 Homestead Road -APN# 326-07=020
SECTION II: FINDINGS
WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an
application for a Tree Removal Permit as described in Section I of this Resolution; and
WHEREAS, the project is categorically exempt from the California Environmental
Quality Act (CEQA); and
WHEREAS, the necessary public notices have been given as required by the Procedural
Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at
least one public meeting in regard to the application; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, the Administrative Hearing Officer finds:
1. That the tree or trees are irreversibly diseased, are in danger of falling, can cause
potential damage to, existing or proposed essential structures, or interferes with
Resolution No. 83 TR -2017-39 October 26, 2017
Page 2
private on-site utility services and cannot be controlled or remedied through
reasonable relocation or modification of the structure or utility services;
The on-site trees were evaluated for their health and their retention suitability and in most
cases the health of the tree determined their suitability for retention. No trees were
determined to be in good health and have good structural stability. Of the 14 proposed
removals, only three trees were evaluated with an above average health rating. These three
Mexican fan palms (Washingtonia robusta,) unfortunately were rated with a poor retention
suitability as the palms are located where the required stormwater control facilities are
proposed and the species is typically not designed to thrive in these areas. The other protected
trees evaluated were determined to be declining in health and/or have structural defects that
cannot be abated with treatment and would require significant management that may still
yield a limited lifespan.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence
submitted in this matter, the Application No. TR -2017-39, is hereby approved; and
That the subconclusions upon which the findings and conditions specified in this
Resolution are based and contained in the public meeting record concerning
Application TR -2017-39 as set forth in the Minutes of the Administrative Hearing
Meeting of October 26, 2017, and are incorporated by reference herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the arborist report entitled, "Arborist Report, Project
#5173.00," prepared by Jake Minnick of HMH (#WE -11830A), dated October 2, 2017
consisting of twelve (12) sheets inclusive of a landscape plan; except as may be
amended by conditions in this resolution.
2. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file no. ASA -2017-05 shall be applicable to
this approval.
3. TREE REPLACEMENT SPECIES
The applicant is required to plant, at a minimum, a medium-sized shade tree in the
public plaza to the satisfaction of the City in consultation with the City's consulting
arborist.
Resolution No. 83 TR -2017-39 October 26, 2017
Page 3
4. TREE REPLACEMENT SIZE
The applicant shall provide adequate tree replacements for trees proposed to be
removed in conformance to the replacement guidelines per Cupertino Municipal
Code Section 14.18.160. The size of the proposed replacement trees shall be modified
as follows to be consistent with the City's Protected Tree Ordinance unless deemed
infeasible by the Ciy's Consulting Arborist:
__.. ....._
a. Diameter of trunk size of removed tree up to 12 inches shall be replaced with
one 24 -inch box tree;
b. Over 12 inches and up to 36 inches shall be replaced by two 24 -'inch box tree
or one 36 -inch box tree; and
c. Over 36 inches shall be replaced with one 36 -inch box tree.
If it is determined that it is physically not feasible to plant the required replacements
trees, the Applicant may pay in -lieu fees determined to be appropriate by the
Community Development Director.
5. ARBORIST REVIEW
Prior to building. permit issuance, the number, location and species of trees shall be
reviewed and approved by the City in consultation with the City's Consulting
Arborist.
The replacement trees shall be planted prior to building permit final. The Applicant
shall provide the Department of Community Development adequate
documentation, including, but not limited to, photographs, receipts or invoices, to
verify that replacements have been planted. The City's consulting arborist shall
inspect the trees after planting and a report ascertaining the good health of the trees
mentioned above shall be provided prior to issuance of final occupancy.
6. PROTECTED TREES
The applicant understands that the replacement trees may not be removed without a
Tree Removal Permit and that they shall be responsible for ensuring the proper
maintenance and care of the trees. The applicant shall also disclose the location and
species of all replacements trees on site upon sale of the property.
7. INDEMNIFICATION
Except as otherwiseprohibited by law, the applicant shall indemnify and hold
harmless the City, its City Council, and its officers, employees and agents
(collectively, the "indemnified parties") from and against any claim, action, or
proceeding brought by a third party against one or more of the indemnified parties
or one or more of the indemnified parties and the applicant to attack, set aside, or
Resolution No. 83 TR -2017-39 October 26, 2017
Page 4
void this Resolution or any permit or approval authorized hereby for the project,
including (without limitation) reimbursing the City its actual attorneys' fees and
costs incurred in defense of the litigation. The applicant shall pay such attorneys'
fees and costs within 30 days following receipt of invoices from City. Such attorneys'
fees and costs shall include amounts paid to counsel not otherwise employed as City
staff and shall include City Attorney time and overhead costs and other City staff
overhead costs and any costs directly related to the litigation reasonably incurred by
City.
8. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant to
Government Code Section 66020(d) (1), these Conditions constitute written notice of
a statement of the amount of such fees, and a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90 -day
approval period in which you may protest these fees, dedications, reservations, and
other exactions, pursuant to Government Code Section 66020(a), has begun. If you
fail to file a protest within this 90 -day period complying with all of the requirements
of Section 66020, you will be legally barred from later challenging such exactions.
PASSED AND ADOPTED this 26th day of October, 2017 at a noticed Public Meeting of
the Administrative Hearing Officer of the City of Cupertino, State of California, held by
the Director of Community Development, or his or her designee, pursuant to Cupertino
Municipal Code Section 19.12.120.
ATTEST:
/s/Ellen Yau
Ellen Yau
Assistant Planner
APPROVED:
/s/Benjamin Fu
Benjamin Fu
Asst. Director of Community Development
Date: October 2, 2017
Project # 5173.00
PROJECT
Bank of America
21020 Homestead Road
Cupertino, CA 95014
PREPARED FOR
Gensler
2101 Webster Street, #2000
Oakland, CA 94612
PREPARED BY
HMH
1570 Oakland Road
San Jose, CA 95131
Jake Minnick
ISA Certified Arborist WE -11830A
Application Number
Aly
DC�'j-1--too -"Ir
DaYQ
lgnatur
Case Marlag" yI
TAT BLE OF CONTENITS
Introduction and Overview
Methodology
Summary of Findings
Planned Development Recommendations
Terms and Conditions
Exhibit A - Tree Location Map
Tree Evaluation Summary
Exhibit B - Tree Photographs
Page
2
3
4
5
8
21020 Homestead Road
HMH was contracted by Gensler to complete a tree survey, assessment and arborist report for
the entire site located at 21020 Homestead Road in Cupertino, California. The site consists of
one retail office building bounded on two sides by double loaded parking, and the other two sides
by Homestead Road to the north and N Stelling Road to the east. Our scope of services includes
measuring diameter at breast height, assessing, and photographing the condition of all trees on
site. Disposition and health recommendations are based on current site conditions. Site
development/design may affect the preservation suitability.
Our tree survey work is a deliberate and systematic methodology for cataloging trees on site:
1. Identify each tree species.
2. Note each trees location on a map.
3. Measure each trunk circumference at 54" above grade per ISA standards.
4. Evaluate the health and structure of each tree using the following numerical standard:
5 - A healthy, vigorous tree, reasonably free of disease, with good structure and form typical of the species.
4 - A tree with slight decline in vigor, small amount of twig dieback, minor structural defects that could be
corrected.
3 - A tree with moderate vigor, moderate twig and small branch dieback, thinning of crown, poor leaf
color, moderate structural defects that may that might be mitigated with care.
2 - A tree in decline, epicormic growth, extensive dieback of medium to large branches, significant
structural defects that cannot be abated.
1 - A tree in severe decline, dieback of scaffold branches and or trunk, mostly epicormic growth,
extensive structural defects that cannot be abated.
0 - Tree is dead.
All trees located on the parcel of 21020 Homestead Road along with any trees within 10' of the
property line are included in this tree inventory. Generally, all dichotomous trees inventoried
showed indications of poor horticultural practices related specifically to care and maintenance
practices. A majority of the ash trees showed signs of mechanical damage from the use of tree
climbing spurs for tree pruning. As a typical best management practice by recommendation of the
International Society of Arboriculture, tree climbing spurs shall only be used in the removal of
dead trees or in emergency rescue situations due to the damage that can be inflicted to the tree
bark and sapwood. Additionally, many of the trees onsite appear to be over pruned as evidenced
by the presence of epicormic growth along the lower scaffold limbs and trunks along with
irregularly shaped canopies, and/or extensive suckering at the base of the tree.
Several trees are located within very close proximity to the chain-link fence and large shrubs along
the southern property line. These trees are severely crowded and stressed by the fence and in
some cases, large neighboring shrubs. Without removal of the objects that are crowding these
trees it is likely that they will continue to decline.
No specimen or heritage trees were observed.
5173.00
HMH 408.487.2200 1 October 2, 2017
21020 Homestead Road
The trees located on the project site are not viable specimens for preservation for the following
reasons:
Mexican fan palm: The Mexican fan palms located on this site are likely volunteers, meaning
they were likely sowed from seed that was dropped from a nearby specimen or bird — not planted
intentionally. This species of palm is not native to the area, but has naturalized and become quite
invasive throughout California in dry regions below 1000' in elevation, making it a typically
undesirable specimen for preservation.
Preservation of the Mexican fan palms may be problematic on this site due to the locations of the
specimens and the requirement for storm water to be treated and infiltrated onsite. Given the
relatively small footprint of the project site, it's likely that storm water will need to be treated and
infiltrated wherever possible throughout the parking lot finger islands and/or planting buffer areas
where these palms are currently located. These palms are not suitable to be located in or near
storm water infiltration sites due to their naturally high level of drought tolerance.
Lastly, fan palms in general do not provide much in the way of amenities to the site given the
small size of the canopy. I recommend replacing these palms with broadleaf trees that will provide
additional shade in the parking lot to reduce the inherent heat island effect that parking lots
present.
Shamel ash: Shame[ ash trees grow very quickly and are shallow rooted. As the trees grow, their
strong, shallow roots expand at a quick rate which can lead to cracked, uneven paving surfaces.
Given the proximity of these trees to nearby flatwork, preservation is not recommended.
The ash trees on this site have been poorly maintained throughout their lifetime which has led to
structural deficiencies throughout the canopies. Climbing spurs have been used repeatedly to
prune these specimens in the past which has removed portions of bark, damaged and exposed
portions of the tree's cambium. It's poor horticultural practices like these that have weakened
these trees, introduced biotic infection, and therefore reduced the overall preservation suitability.
African sumac: The Rhus trees on this site were observed in various stages of decline. The
typical low -branching structure of these trees can be problematic for parking lot areas where
canopy clearance is mandatory. I recommend replacing these trees with a more suitable species
for the area.
Holly oak: This holly oak is located on the adjacent parcel just feet from the existing fence line.
This specimen shows signs of stress associated with overcrowding and possible overwater during
times of dormancy. It's likely that this specimen will continue to slowly decline if the nearby fence
and oleander shrubs are not removed or relocated to allow the tree room to mature.
5173.00
It's recommended to replace the above specimens with regionally appropriate broadleaf
selections that will provide wildlife environment, produce adequate shade for the parking lot, and
live alongside proposed drought tolerant plant species with similar water needs. Properly selected
HMH 408.487.2200 2 October 2, 2017
21020 Homestead Road
and sized replacement trees will quickly exceed the canopy coverage of the existing specimens
and replenish the urban forest.
The following terms and conditions apply to all oral and written reports and correspondence
pertaining to consultations, inspections and activities of HMH.
1. The scope of any report or other correspondence is limited to the trees and conditions
specifically mentioned in those reports and correspondence. HMH assumes no liability
for the failure of trees or parts of trees, either inspected or otherwise. HMH assumes no
responsibility to report on the condition of any tree or landscape feature not specifically
requested by the named client.
2. No tree described in this report was climbed, unless otherwise stated. HMH does not take
responsibility for any defects, which could have only been discovered by climbing. A full
root collar inspection, consisting of excavating the soil around the tree to uncover the root
collar and major buttress roots was not performed unless otherwise stated. HMH does
not take responsibility for any root defects, which could only have been discovered by
such an inspection.
3. HMH shall not be required to provide further documentation, give testimony, be deposed,
or attend court by reason of this appraisal or report unless subsequent contractual
arrangements are made, including payment of additional fees for such services as
described by HMH or in the schedule of fees or contract.
4. HMH guarantees no warrantee, either expressed or implied, as to the suitability of the
information contained in the reports for any reason. It is the responsibility of the client to
determine applicability to his/her case.
5. Any report and the values, observations and recommendations expressed therein
represent the professional opinion of HMH, and the fee for services is in no manner
contingent upon the reporting of a specified value nor upon any particular finding to be
reported.
6. Any photographs, diagrams, graphs, sketches or other graphic material included in any
report, being intended solely as visual aids, are not necessarily to scale and should not be
construed as engineering reports or surveys, unless otherwise noted in the report. Any
reproductions of graphic material or the work produced by other persons, is intended
solely for the purpose of clarification and ease of reference. Inclusion of said information
does not constitute a representation by HMH as to the sufficiency or accuracy of that
information.
7. Trees can be managed, but they cannot be controlled. To live near trees is to accept
some degree of risk. The only way to eliminate all risk associated with trees is to eliminate
all trees.
5173.00
HMH 408.487.2200 3 October 2, 2017
21020 Homestead Road
EXISTING TREE, TYPICAL
HMH 408.487.2200
EXHIBIT A - TREE LOCATION MAP
21040 HOMESTEAD ROAD
9
8
7
• 6 5
....ate _„ .. r. i
mu I
LIMIT OF WORK
4
5173.00
October 2017
21020 Homestead Road 5173.00
TREE EVALUATION SUMMARY
Prepared By: Jake Minnick, ISA Certified Arborist #WE -11830A
DBH MEASUREMENT HEIGHT: 54"
Date of Evaluation: 5/22/2017
Suitability for Preservation is based on the following
Good - Trees with good health and structural stability that have the potential for longevity at the site.
Moderate - Trees in somewhat declining health and/or exhibits structural defects that cannot be abated with treatment. Trees will require more intense management and will have a shorter
lifespan than those in the'Good' category.
Poor - Trees in poor health or with significant structural defects that cannot be mitigated. Tree is expected to decline, regardless of treatment.
Health Rating
5 A healthy, vigorous tree, reasonably free of disease, with good structure and form typical of the species.
4 A tree with slight decline in vigor, small amount of twig dieback, minor structural defects that could be corrected.
3 A tree with moderate vigor, moderate twig and small branch dieback, thinning of crown, poor leaf color, moderate structural defects that may that might be mitigated with care.
2 A tree in decline, epicormic growth, extensive dieback of medium to large branches, significant structural defects that cannot be abated.
1 A tree in severe decline, dieback of scaffold branches and or trunk, mostly epicormic growth; extensive structural defects that cannot be abated.
0 1 Tree is dead.
Abbreviations and Definitions -
CD Codominant branches Forked branches nearly the same size in diameter, arising from a common junction an lacking a normal branch union.
CDB Dieback in Crown Condition where branches in the tree crown die from the tips toward the center.
CR CR Tree is bounded closely by one or more of the following: structure, tree,
D Decline Tree shows obvious signs of decline, which may be indicative of the presence of multiple biotic and abiotic disorders.
DBH Diameter at Breast Measurement of tree diameter in inches. Measurement height varies by City and is noted above.
Height
EG I Epicormic Growth Watersprouting on trunk and main leaders. Typically indicative of tree stress.
EH Exposed Heartwood Exposure of the tree's heartwood is typically seen as an open wound that leaves a tree more susceptible to pathogens, disease or infection.
IB Included Bark Structural defect where bark is included between the branch attachment so the wood can't join. Such defect can have a higher probability of failure.
LC Low crotch Multiple central leaders originating below the DBH measurement site.
LN Leaning Tree Tree leaning, see notes for severity.
MA Multiple Attachments More than one branch originating from same location on trunk. Indicates an area that could be predisposed to failure.
PT Phototropism Tree exhibits phototropic growth habits. Reduced trunk taper, misshapen trunk and canopy growth are examples of this growth habit.
S Suckers Shoot arising from the roots.
SD Structural Defects Naturally or secondary conditions including cavities, poor branch attachments, cracks, or decayed wood in any part of the tree that may contribute to structural
failure.
SE Severe Indicates the severity of the following term.
SL Slight Indicates the mildness of the following term.
SR Surface Roots Roots visible at finished grade.
WU Weak Union Weak union or fork in tree branching structure.
All trees of any species listed in section 14.18.050 Protected Trees, Appendix B on private property that have a minimum single trunk diameter of ten inches
Specimen Tree (thirty one inch circumference) or minimum multi trunk diameter of twenty inches (sixty three inch circumference) measured four and one half feet from
natural grade are considered Specimen trees.
HMH 408.487.2200 5 October 2, 2017
21020 Homestead Road
5173_nn
HMH 408.487.2200 6 October 2, 2017
MULTI-
PRESERV-
TREE #
BOTANICAL NAME
COMMON NAME
TOTAL
STEM
CIRCUM-
SPECIMEN
HEALTH
ATION
NOTES
RECOMMENDATIONS
DBH
DBH
FERENCE
TREE
SUITABIL-
ITY
SR EG, CD, IB, poor
Allow this tree time to recover from recent
Fraxinus uhdei
shame) ash
23.0
72
3
Moderate
horticultural practices - over
over pruning before the next pruning cycle.
pruned, climbing spur damage
Do not use climbing spurs to ascend this
on trunk
tree in the future. Continue to monitor.
2
Rhus lancea
African sumac
14.0
44
1
Poor
EG, EH, CD, LN, SR, CDB, SE
Remove
S, ST, D
3
Rhus lancea
African sumac
16.1
51
1
Poor
EG, EH, CD, LN, SR, CDB, SE
Remove
S, ST, D
L�
Fraxinus uhdei
shamel ash
24.1
-9-6-8-2—
76
3
MS, SR, LN, CD,-IBLC,-WU
Moderate
6.3
CR, SL leaf spot
Allow time to recover from recent over
pruning before the next pruning cycle.
SR, LN, MA, leaf spot, IB,
5
Fraxinus uhdei
shame) ash
9.5
30
2
Moderate
multiple WU, CR, located on
Continue to monitor.
adjacent parcel on the fence
line/property line
MS, LN, SE CR, located on
Removal of the fence and heavily
6
Quercus ilex
holly oak
10.2
5.3+4.9
32
2
Moderate
adjacent parcel on the fence
encroaching oleander shrubs could allow
line/property line
for an increased chance of preservation
7
Rhus lancea
African
34.3
4.6, 12.3,
108
2
Moderate
ML, poor horticultural
Prune back structurally deficient, juvenile
sumac
9 4 8
practices, SE EG, MA, SD, CR
and mature epicormic growth along
misshapen trunk sections. Typical crown
cleaning and thinning coupled with the
7.5, 4,
3
Rhus lancea
African sumac
40.9
8.6, 4.1,
128
2
Moderate
ML, poor horticultural
removal of several juvenile stems may
7.3, 3,
practices, SE EG, MA, SD, CR
increase these trees future preservation
6.4
1
suitability rating.
9
Washingtonia robusta
Mexican fan
18.8
59
4
Poor
Approximately 35' tall, recently
Although these trees are currently in good
palm
pruned, straight trunk
health, the future development and onsite
storm water infiltration negatively impacts
10
Washingtonia robusta
Mexican fan
21.1
66
4
Poor
Approximately 15' tall, recently
their preservation suitability. Palms
palm
pruned, straight trunk
generally are not recommended for use in
or adjacent to areas of onsite water
Washingtonia robusta
Mexican fan
20.2
63
4
Poor
Approximately 30' tall, recently
infiltration due to their low water
palm
pruned, straight trunk
requirements.
HMH 408.487.2200 6 October 2, 2017
PA10417:eirer. .-T•1Z.FT:'
51 7.'1 nn
HMH 408.487.2200 7 October 2, 2017
MULTI-
PRESERV-
TREE #
BOTANICAL NAME
COMMON NAME
TOTAL
STEM
CIRCUM-
SPECIMEN
HEALTH
ATION
NOTES
RECOMMENDATIONS
DBH
DBH
FERENCE
TREE
SUITABIL-
ITY
LN, SE EG, SR, CR, PT -
under canopy of #12, SL leaf
spot, poor horticultural
12
Fraxinus uhdei
shamel ash
16.2
51
2
Moderate
practices - over pruned,
climbing spur damage on
trunk, visible gopher activity in
root zone
LN, EG, SR, EH @ root crown
from poorly executed root
pruning, SL leaf spot, poor
Allow this tree time to recover from recent
13
Frazinus uhdei
69
shamel ash
21.9
2
-Moderate
horticultural practices - over
over pruning before the next pruning cycle.
pruned, climbing spur damage
Do not use climbing spurs to ascend this
on trunk, visible gopher activity
tree in the future. Continue to monitor.
in root zone
LN, EG, SR, SL CDB, CD,EH
@ root crown from poorly
executed root pruning, SE leaf
14
Fraxinus uhdei
shamel ash
23.8
75
2
Moderate
spot, poor horticultural
practices - over pruned,
climbing spur damage on
trunk, visible gopher activity in
root zone
HMH 408.487.2200 7 October 2, 2017
21020 Homestead Road
HMH 408.487.2200
5173.00
October 2, 2017
21020 Homestead Road
HMH 408.487.2200
E
5173.00
10
October 2, 2017
PLANT LEGEND
arw.
=WON'Nrmmewm. xu.
eonyrrw.e.@mmmN :m:.l�ma@memylenn+v
sx.imswee)
.eer..mFm,m.mnm Im.mm",�.w
..wr>mme Perem�,rme
An Har...p wl mruerMYe.mr.emywq.
Fa. ae meam'asJ rY,YgemM �tlm�`F�mm'Nm,eMa'
4'^'. E rpemamm
enm/erre.@ mYmrye�Yemrm
enuym.mr.wrmmmv)
NS"Irmrmi.reMe0.
aeawaenee wrreetimreppi.mPmoremeee
mmP />o'b+vwiae@mebnb ."ewaYesmw aaa
Mrer.ewelr >�+..' Breem YxnM
C �• ;a; T.rMwl.m moe JwNl.Y zn.r/e.Y@mYmN
tN, w. mbemaasraum. ewmmsPmq nam mm4'mn Y0.
T . � ^ - xamibry larumecnrl
,y.,jgq Ewentcmue'Fuewvr �•. � >nNl.be me.e@nwnry
� ie � S �A S F� / 0.tlWaeTne J uNmnmbmsMseers
,�Lm mnrb/+s.ae@mee.b vmYruM rup0.rvmamrr
��i umrerewerr fir EPAeu •ee.mebwr.. wndrovwP
� 1 ,rnrene lml'Nauvfn"Iar�exeete � MwMa�•mmK"Y'nuYm tiW
ory nbSenmr FYMepec.r � �� �" �f vrr.a arae
10—
}wcrwmrm0..—h..-.
�� •eebegexeb mm
! rnyrmY.rro.e.m.@memory G2 -=qty mm merx�..rr.6arY. mwms
Im YPux"0.•en.Yrywaeree-s ..arnv+ ntl
�- z• u.m.muYw...r
! EnPnrcwamm @mY.rblum -" Pixw.u.iYu.e "`°rr.a. r...s
s mmbetwemarYl ��
"xr- �T wwrr.w vwmwr•w.mn.o.m.e"aem.
Yh
E.ry.m @,iw YBYy,.+^". Y � Faeem+"�rvtmi •noue*o'c
.........r.. d���!'r:�t7�� �FwmrbsmaYemrm
' me.wowrYme,,r..")rerwma
HOMESTEAD ROAD
z
y
m
Z
A
D
O
Bank ofAmerica
Homestead Road
New Store
21020 Homestead Road
Cupertino, CA 95014
SERIAL NUMBER: CA
NRSP VERSION: 2.0
BULLETIN: 2017-2
smemoo r.smm
Tdl Gwelt
Gensler F n�na S Orb ]iW
4wrnsMNwwe
Pavement Engineering Inc.
rr.eer, v�w.canme � �r puratron
rmamRomuw.
I+w.,o..mx.awmwmm
ID .
s¢vli.eor.�m
PreAamvp SWnO.
lei ot"elrcnm. xmarw Rotl
Imrm..
IPRmMIf W 1Y IAN0.5CPPE RPN
u sxovn
SHEET L.01
PROGRAM INFORMATION
LOCATION INFORMATION
21020 Homestead Road
Corner of Homestead and N. Stelling Roads
Cupertino, CA 95014
TF-DENO-GR
FLAGSHIP
• (7) OFFICES p
• (3) ATM DAY 1 4
• (3) TELLERS W/ BR _
GLASS _
• (10) WAIT SEATING
• (1) LG UCC a
• (2) SM UCC (1) • (1) WU N.D.
DISPOSITION OF (E) TREES
All existing site trees were deemed unsalvageable
due to condition and unsuitable for
proposed site uses - all current site trees
are planned to be removed.
NOT A PART OF THIS SUBMITTAL
SIGNAGE DESIGN, LAYOUT, LOCATION OR
SIZE
HOMESTEAD ROAD
(N)CURB CUT (E) CITY STREET LIGHT I.A
24'-0'WIDE Z R.O.W. DEDICATION TO THE CITY OF
M m
O
S89'4T00'E 129.63'
Proposed Use: Bank
I I 000 \ \ Hours of Operation: Mon. - Thurs. 9-5
SERIAL NUMBER: CA
3woassr 04� Friday 9_6 NRSP VERSION: 2.0
A00.52 \ ` Saturday 9-2 BULLETIN: 2017-3
\ Sunday Closed
I (E)2J�x20' L Number of Projected Employees : 13
I E' EMEN NEW Number of Projected Users: To Be Determine
ACIFIC BELL NEW -
SEWER MONUMENT \ 2101 wm.a,slm.l
—SIGN
SEFZ,VICE ���Q \ sw zoao
2 — r__--_ -_-------------- ---- - -------, 5 J — Gensler T�lq c. 5106257413
\ SITE REQUIREMENTS
TRELLIAGE r
SCREEN
PLANTING ® I \ so
r1_11I1--'-�1
1 L k�k� kd kd
1 I 1 I
EIN
UNDERGROUND
ELECTRICAL
Bankof America
of 08131/2017 WM H
Homestead Road
02 10118117 WM AH
T
New ew Store
RC LENGTH: 62.97'
iiOAIE OEN6iR1:6980%TIO N
CURVE
21020 Homestead Road
RADIUS: 40W ZONING INFORMATION
Cupertino, CA 95014
Proposed Use: Bank
I I 000 \ \ Hours of Operation: Mon. - Thurs. 9-5
SERIAL NUMBER: CA
3woassr 04� Friday 9_6 NRSP VERSION: 2.0
A00.52 \ ` Saturday 9-2 BULLETIN: 2017-3
\ Sunday Closed
I (E)2J�x20' L Number of Projected Employees : 13
I E' EMEN NEW Number of Projected Users: To Be Determine
ACIFIC BELL NEW -
SEWER MONUMENT \ 2101 wm.a,slm.l
—SIGN
SEFZ,VICE ���Q \ sw zoao
2 — r__--_ -_-------------- ---- - -------, 5 J — Gensler T�lq c. 5106257413
\ SITE REQUIREMENTS
TRELLIAGE r
SCREEN
PLANTING ® I \ so
r1_11I1--'-�1
1 L k�k� kd kd
1 I 1 I
EIN
UNDERGROUND
ELECTRICAL
IQ I„•, oamalaa�a Raacrlptlen evc,
of 08131/2017 WM H
PLANNING COMMENTS#1
02 10118117 WM AH
PLANNING COMMENTS#2
SERVICETEUDATA
NEW
s.
SERVICE
■IAJ
'.
Iso ansl9wmre
Ieralaat
HR VEST.
IMEDIUM
CFewle Nam•
I
r— [
1 Lu
PROPOS
E9 O
i a
02 TRASH LOADING
A00.52 12
I
I I
L-- RFMnVF fFI FI Fr:TRIr.AI TRANCFl1RMFR
1-1
RAISED ACCESSIBLE PATH TO
TRASH ENCLOSURE
0
TYP
arsr
a:ILY
PROPOSED PARKING
Q
TIM;
Appiicai�W� N6,
lW
9
(4)
N1
N6�zq�_--_
FROM CU(tB, TYP.
(E) BUS STOP `
Fac hik: 5106257499
SETBACKS - Title 19:
Front Setback: 22 FT (building height).
HEIGHT:
Height Limit = 30' at Stelling Gateway Area
Proposed Height = 22'
Proposed Number of Stories = One Story
PAVING AREA
12,782 sf existing
15,730 sf proposed replacing all of the
existing paving. 62%of site as paving
LANDSCAPED AREA
203 sf corner landscaped area
641 sf parking lot landscaping
5,786 sf total
23% of lot area
PARKING -title 19 19.124:
Z Proposed Building Size: 4172 SO. FT.
co Space/sq.ft.: 250 per SO. FTG.
�( = 17 spaces reqd.
33 spaces provided
(None are Compact Spaces)
Z Bicycle spaces = 1 / 1250 sf bldg.
C) 4 spaces reqd. at entrance
Accessible parking spaces required = 2
0 Of which one is required to be a
van accessible parking space
Q per CBC 11B-208.3
Clean Air Vehicles per CAL Green
3 spaces required.
One full -foliage tree for every
5 parking spaces = 7 trees
4% of site dedicated to bio swale
surface as our new impermeable
surface parking lot is> 10,000 sf
LEGEND
so (E) STORM DRAIN
TO REMAIN
(E) CITY UTILITY POLE
TO REMAIN
I NEW PARKING LOT
LIGHT STANDARD
LOCATIONS
(E) PROPERTY LINE
(E) CHAIN LINK FENCE
(N) GAS METER
LOCATION
--------UNDERGROUND UTILITY
SERVICES
EXISTING SITE USES
Existing Office Building 5265 V
Existing Uses include: Chiropractors,
Beauty Salon & Massage Therapist
Existing Building Height 14,8'
Existing one-story building
R.O.W. REQUIREMENTS
Dedication of 10'-0” Wide Right Of Way strip at
each public way for City Sidewalk and
planting strip. Applicant provides plat map,
City will write the dedication. lo'-0"from
face of existing street curb.
1
IQ I„•, oamalaa�a Raacrlptlen evc,
of 08131/2017 WM H
PLANNING COMMENTS#1
02 10118117 WM AH
PLANNING COMMENTS#2
'.
Iso ansl9wmre
Ieralaat
Bank of America -Homestead Road
I pr•terypa Layout
IMEDIUM
CFewle Nam•
Ioa:2502.002
�npuo•
PROPOSED SITE PLAN
f t1
0 2' 4' 8' 16'
A OO.5O x•c xo,u
�•� J
HOMESTEAD ROAD
F.A.R. CALCULATION
4172 SQ. FT.
Net Lot Size:
24,163.01 SQ. FT.
Bank ofAmerica
'
ZONED: P(CG)
Homestead Road
APN: 326-07-020
New Store
Parcel B
Existing Lot Size: 25,422.15 SQ. FT. From (E) Survey
21020 Homestead Road
(N) Street Easment: - 1,259.04 SQ. FT. (subtract)
Net Lot Size: 24,163.01 SQ. FT.
Cupertino, CA 95014
Building Size:
4172 SQ. FT.
Net Lot Size:
24,163.01 SQ. FT.
FAR:
.17
Proposed Use:
Bank
SERIAL NUMBER: CA
NRSP VERSION: 2.0
BULLETIN: 2017-3
2101Nchsla Str
Swt� 2000
-d, CA 94612
Gensler Rlclph 510.6:5.7413
Facsimile: 510.625.7499
z
m
z
0
0
4 =.o
Issue 6lszuv Ovscriplivn Lkeck
01 081312017 WM AH
PLANNING COMMENTS #1
02 10111/17 WM AH
PLANNING COMMENTS #2
IPrvlvc[Namv
Bank o1 Amedca - Homestead Road
IP'.YPv YvMEOIUM
ILPp Flle —
11-2502.002
lo:�capoo�
SITE DIAGRAM FOR FAR CALCULATION
0 2' 4' 8' 16'
A00.51 T.°r
METAL
ROOF
STRUC1
CRETE APRON
TRASH ENCLOSURE ROOF PLAN 10 COVERED TRASH ENCLOSURE PLAN 02
SCALE: 112"=1'-0"
A prr O AL
0 X1-4
e.3.w".i-
r )7.02
SPACED
SIDING
ALL 4 SI
1 PAINTED STEEL DOORS I
ELEVATION TRASH ENCLOSURE 03
SCALE: 112"=1'-0"
�v
v
t erlrs L�
i a 1r+".
I ,
SEAT WALL FACING MATERIAL
GRADE
PRECAST CONCRETE
WALL EDGING WI SKATEBOARD
DETERRENTS
CONCRETE SEAT
WALL AT STREET CORNER
PRECAST LEDGESTONE
WALL FACING: CORONADO
PRO LEDGE OAKBROOK
WALKWAY
SEAT WALL nA
SCALE: NONE DT_&W-()086 SCALE: 1112"=V -O" DT MW 0086
KEY NOTES
BankofAmerica'®"
Homestead Road
New Store
21020 Homestead Road
Cupertino, CA 95014
SERIAL NUMBER: CA
NRSP VERSION: 2.0
BULLETIN: 2017-2
z1D1 wcncrm svcm
Gensler Tlcphc 510.625.1113
Facsimile: 51-5.119a
D.sc '— By cnca
1a01a 08131/2017 WM AH
PLANNING COMMENTS
15e 11519naturo
IP.J-N...
Bank of America -Homestead Road
IP1t.WP1 tar-
Ic�E01UM
D Fllc Namo
33.2502.002
(Dcunnb-
SITE DETAILS
Iscaia ASINDICATED
A00.52
Nef. NorN
k of America
mestead Road
w Store
0 Homestead Road
rtino, CA 95014
9L NUMBER: CA
' VERSION: 2.0
,ETIN: 2017-3
2101 IV Wt.,S—
CA N612 nsler w h e: 510.6'3.7413
Farsimil.: 510.625.7499
o.f.ai:... o..moa.. By Ch -
)l 08131/2017 WM AH
PLANNING COMMENTS 91
)2 10/10117 WM AH
PLANNING COMMENTS C2
menta • Homestead Road
fANCE DIAGRAM
��
i6' 32'
X0.53
NORTH ELEVATION - HOMESTEAD ROAD
SCALE: 3116" =1'-0" EE -01
Wt5 I tLtVA I IUN - 51Ut 2
SCALE: 3116" =1'-0" EE -01
SOUTH ELEVATION - REAR 4
SCALE: 3116" = V-13" EE -01
APPR9VAL
Applicadon Number
e�
.. lila er
EAST ELEVATION - N. STELLING ROAD 3
SCALE: 3116" = 1'-0" EE -03
NOT A PART OF THIS SUBMITTAL
BUILDING SIGNAGE SHOWN FOR INFORMATION ONLY—
BUILDING AND SITE SIGNAGE UNDER SEPARATE CITY
APPROVALS.
Bank of America �!
Homestead Road
New Store
21020 Homestead Road
Cupertino, CA 95014
SERIAL NUMBER: CA
NRSP VERSION: 2.0
BULLETIN: 2017-2
2101 W.bin S-1
Gensler 'TcicpA nc: IWAZ5.143
Facsimile: 510.625.7499
I zOzzcxpxan By
0-
01
Isa 06/31/2017 WM AH
PLANNING COMMENTS
I5, MSlgnatura
Prc,eeJ Nama
Bank of America- Homestead Road
Pltetypp Layout
MEDIUM
ICAD FHa Name
33.2502.002
IDeu„ptloD
EXTERIOR ELEVATIONS
j—,. 3116'=1'-0'
00 P'
A09.11
EXTERIOR FINISH SCEDULE
STUCCO 1 PLASTER (BASED ON PAREX STUCCO)
_
[BAC PRESCRIPTIVE] I -BASIS OF DESIGN-
, -
9.1 IN87mNDRA•,SANORNSFINISH
ST, 1NB2WARMSwWWDRNERNISH
-
ST. INJT•MOSS*.SMOONFUIISH
ALUMINUM COMPOSITE METAL PANEL
[BAC PRESCRIPTIVE] I"BASIS OFDESIGN-
ESIGN-
Ism.RED' WMMBTR
Ism.—
ACM,2 'RVW VMITE'o1MIJJRVW
ACMJ NATCH STOREFRONP
GLAZING [BAC PERFORMANCE]
_
[L-1 1'HEATSTREIIGTHENEDCLFPAINS=TEDGIFLNo
GL -2 VTWPEREDIASUTATEUGIABNG
GW 10nsMPEREDMONOLRHICGIASS
CL -J SE-TEMPEREDMONOLRHICGIASS
ALUMINUM GLAZING FRAMES
[BAC PRESCRIPTIVE] I "BASIS OF DESIGN"
21020
AG -1 CURTNNWALLSYSTEM
ACh1.1
AF2 STOREFROMSYSTEM
STUCCO ACCESSORIES (ALL PAINTED EXPT-3)
Sal vnoEDLwxEL scPFED
Saz xARRD•ncxAxxELscREEa
SA,1 MODIFED CHANNELSCREED
METAL COPING [BAC PERFORh1ANCE[
MGI PREFNISHEO METALOOPING CUSTOM COLORTOMATCH ST
pp
-3
EXTERIOR PAINT
[BAC PRESCRIPTIVE]/
R.HCA0OFDES1I1E
EYPT-1 INI85J COLOR:HC-102'CIARKSVILLEGRAY, MATCHES 5T3: AI05G
-
ENPT-2 [1,1185]COLOR:HCBD SLEEKER BEIG_,MATCHES ST3: WARM SAND
ST -2
ST -1
E a INnlq COLOR:OASSIC NIONSTONEHOUSE, MATCHES ST-1:TUNDRA
DPT -5P251 COLOR'k213150 PIGEON GRAN
(BASED ON BENJAMIN MOORE)
NORTH ELEVATION - HOMESTEAD ROAD
SCALE: 3116" =1'-0" EE -01
Wt5 I tLtVA I IUN - 51Ut 2
SCALE: 3116" =1'-0" EE -01
SOUTH ELEVATION - REAR 4
SCALE: 3116" = V-13" EE -01
APPR9VAL
Applicadon Number
e�
.. lila er
EAST ELEVATION - N. STELLING ROAD 3
SCALE: 3116" = 1'-0" EE -03
NOT A PART OF THIS SUBMITTAL
BUILDING SIGNAGE SHOWN FOR INFORMATION ONLY—
BUILDING AND SITE SIGNAGE UNDER SEPARATE CITY
APPROVALS.
Bank of America �!
Homestead Road
New Store
21020 Homestead Road
Cupertino, CA 95014
SERIAL NUMBER: CA
NRSP VERSION: 2.0
BULLETIN: 2017-2
2101 W.bin S-1
Gensler 'TcicpA nc: IWAZ5.143
Facsimile: 510.625.7499
I zOzzcxpxan By
0-
01
Isa 06/31/2017 WM AH
PLANNING COMMENTS
I5, MSlgnatura
Prc,eeJ Nama
Bank of America- Homestead Road
Pltetypp Layout
MEDIUM
ICAD FHa Name
33.2502.002
IDeu„ptloD
EXTERIOR ELEVATIONS
j—,. 3116'=1'-0'
00 P'
A09.11
TRELLIAGE
SCREEN
PLANTING
DRIVEWAY
O
In
OFFICE
a�
Q
SIDEWALK
TRANSVERSE SECTION THRU HOMESTEAD ROAD A-A�
SCALE: 118" =1'-0"
DISH
TRELLIAGE —
SCREEN
//�� PLANTING BREAK
I � ELECT. NETWORK ROOM OFFICE
I DRIVEWAY I
UNDERGROUND
ELECTRICAL
TRANSFORMER
INTERIOR (f ATM L44=11 I i ��.
24 HOUR VESTIBULE
SIDEWALK
-
�I
N.N. STEd
LONGITUDINAL SECTION THRU N. STELLING ROAD B_BI
SCALE: 118" = V -D"
ankofAmerica
''!"
Homestead Road
New Store
21020 Homestead Road
Cupertino, CA 95014
SERIAL NUMBER: CA
NRSP VERSION: 2.0
BULLETIN: 2017-2
vol wcualR svcn
Gensler Tdgh ne: 510.635.7413
F..imilc: 510.623.7499
IAism. om.alssu. o.scnPnon eycx.ca
01 08/312017 WM AH
PLANNING COMMENTS
ISe ISlgnamm
IPr.l.etxam.
Bank of A-6. - Homestead Road
IP1—yp. Layo.t
IMEDIUM
AO FII. Nam.
33.2582.802
lo.acncu..
BUILDING SECTIONS
1-1. 118'=1'4'
0 2' 4' 8' 16'
A09.15
Application Numbe,
TRELLIAGE
SCREEN
PLANTING
DRIVEWAY
O
In
OFFICE
a�
Q
SIDEWALK
TRANSVERSE SECTION THRU HOMESTEAD ROAD A-A�
SCALE: 118" =1'-0"
DISH
TRELLIAGE —
SCREEN
//�� PLANTING BREAK
I � ELECT. NETWORK ROOM OFFICE
I DRIVEWAY I
UNDERGROUND
ELECTRICAL
TRANSFORMER
INTERIOR (f ATM L44=11 I i ��.
24 HOUR VESTIBULE
SIDEWALK
-
�I
N.N. STEd
LONGITUDINAL SECTION THRU N. STELLING ROAD B_BI
SCALE: 118" = V -D"
ankofAmerica
''!"
Homestead Road
New Store
21020 Homestead Road
Cupertino, CA 95014
SERIAL NUMBER: CA
NRSP VERSION: 2.0
BULLETIN: 2017-2
vol wcualR svcn
Gensler Tdgh ne: 510.635.7413
F..imilc: 510.623.7499
IAism. om.alssu. o.scnPnon eycx.ca
01 08/312017 WM AH
PLANNING COMMENTS
ISe ISlgnamm
IPr.l.etxam.
Bank of A-6. - Homestead Road
IP1—yp. Layo.t
IMEDIUM
AO FII. Nam.
33.2582.802
lo.acncu..
BUILDING SECTIONS
1-1. 118'=1'4'
0 2' 4' 8' 16'
A09.15
.'Autumn Blaze'
Tine
IG Olde O maturity
A.,
'.o Fast graCtOrsle
f Davy soils or soggy ground
nage s0ales)
la tree, briniad red foliage In too
Zelkova wnubta'Gme Vase'
re -.
yi
PLANT LEGEND
Perennial fl R/tlmme)
SYMBOL I
QTY.
SIZE
BOTANICAL NAME
COMMONNAME
SPACING/NOTES
TREES
l -
Maderete crater
9
R'
Tole.ld of Davy calls, drougOt, DM
/ •�
T7
5
24
Acer rubmm'Auwmn Blain'
Rod MaPle
-
T2
2
24
Zak ova wmrlaW'Gm,a Vaso'
S,Eleaf Zelkova
Tree Gratesh Sidocalk Area
T3
9
24
Lag"Ine"WTuscarora'
Crape MyN.
-
SHRUBS
34 l( �+!
•T Y
SOsOy Beal, In Summer, Fall fonage color
(
Evergreen SOub
w r "
�Y` tae
S7
14
5
OsmaatCu DleropDrius Vadegate
Holly Leaf Osm.mQ.
Spaced 048'... max,
S2
12
5
Loropetalum cdnsa, 13,rgundy
COn.se Fring.R.Oer
-
S3
17
5
Nndins domestics'G,Ystmam'
Heaveny Bamboo
Spaced 036'o.c. max.
S4
18
5
Cistus Gybrid.
Wale Rocksce
S5
8
5
Cowulaucium und-hure'Purple Pddo'
GWaIdWn Wax FI,Cer
S6
11
1
Coleorues pukDlW'Sunaet Gold
8ratOof Heaven
-
GRASSES I PERENNIALS
I ROUNDCOVER/VINES
G7
35
1
Rosmarinus oRclrafn'Pmanawm'
Rosemary
Spaced 0470.1. max.
G2
160
1
MuOenbergis litd0simeri'Autumn GI,O'
MaOy Grew
TrlargWarspaced036'o.c.max.
G3
11
5
PD.W.'Mwri Maiden'
N.0 Zwb dI Flax
G4
65
1
Catoneaster dammed'Lo❑last
B -lb. yC.Waaster
Spaced 48' ..c. max.
G5
14
1
Coreopsis v,ricilWW'Mwnbeom'
Tor dIwfTIckwed
Spaced 024 o. o. max.
G6 1
38 1
1
1 TuibegOa violacoa
Soci ty Gadk
Spaced 24'o.c. max.
G7
72
1
Cytostome eolllstegiomas
Vi.I tTmmpet Vm.
-
.'Autumn Blaze'
Tine
IG Olde O maturity
A.,
'.o Fast graCtOrsle
f Davy soils or soggy ground
nage s0ales)
la tree, briniad red foliage In too
E, s A!�
Zelkova wnubta'Gme Vase'
re -.
yi
smWearZe#rwa
Perennial fl R/tlmme)
Deddu... T.e
78'tlg000ke0 maturity
SG DBD/ 30'W 40 Gide 0 maturity
`}
Fk
MadI Outer
_
Moderate groGlOmle
l -
Maderete crater
9
R'
Tole.ld of Davy calls, drougOt, DM
/ •�
Not.pWWdtob..grit rdysuswptibla
'� 5: a,.;;(�rP
Y
to pest hfoamtlons ord'soaw.
"y
""'W'oomla Tusprora'
Craps Myrtle
ClYtestores callaleg oldos
D ckluwsT.e
• k
L
20' [[go/ 16 Olde 0 maturity
yr
Maderelo Qatar
Evegroen V no
Silo to moda.w gro010mte
Strong groCng vine but easily kept in cOcck
Tolerantof DatOTusc win` D/brid selected
+' i �M
for Curdinew 0 resistance to mildeD
34 l( �+!
•T Y
SOsOy Beal, In Summer, Fall fonage color
E, s A!�
OsmantM. Cuta.pWI.s Vanog.W.'
re -.
yi
Hogy Leer Osmangws
Perennial fl R/tlmme)
Evergreen Scrub
78'tlg000ke0 maturity
B a maturity-
^-. 3
5'
(Wik..pnmg,O.OarngO.Il f.r.
Minimal Is Moderate Qatar
tall Oldg.)
Very WugoL Long-lived plant¢an survive
Maderete crater
OBOonly xcasianal Oster
Variegated leaf color Ilgaens aMdy areas
ikY 1f 1� -
LWapeWlum c❑ne 1BugundY
Chinese Fdnga Flower
'� 5: a,.;;(�rP
Y
BARK MULCH. -
"y
Evergreen SQub
4' Olde max.0 maturity (lalms
ClYtestores callaleg oldos
pinnni!Wng a 0 scouringOen)
• k
L
Regular Oster
Bronze -purple foliageyear mundU calla
Evegroen V no
pink filso— In Spring, Intermittently for rest
Strong groCng vine but easily kept in cOcck
of too year
+' i �M
Handnodomesdca'GuYdream'
34 l( �+!
•T Y
Heevan/yBemboo
(
Evergreen SOub
w r "
�Y` tae
3-1/2 tlg0/7-1rz' oke ❑ mawnry
w
Minimal W Moderate Cater
d��
Sma00ate fbow, In Spring, milted
foliage(red. yelloD green)year round
Easy cere, extremey Wugo
CIO. Lybddw
WMfe Raekrose
Evergreen Soul
4 Og D/ B Olde max. C maturity (lousily
smaller, around 3 OgO by VOW.)
Minimal Outer
Carefree scrub blemM to droug0, Dat,
poor will, Gird
Wore %Care O/yegaO centers In Spring,
Summer
COun. aucwm..ms um'Psvplo Pride'
GerabYarW Flower
Evergreen SOub
B ago/ G Oldo O maturity (can ba kept W
4'Culg❑OW gular pruning)
Moderate Cater
Blooms In late Winter IOougOSpring,
covered In rosy pink W purple flo0ars
Calomama puEDIW'Sunsst Gold'
BreafhorHeaven
Evergreen Scrub
T clgot raid. 0 maturity
Moderete Cater
YelbOgold folaga year mundQirry pink
floOem In Spring 0 Summer
Rosman momclnalis'Prost.tum'
Rosemary (Groundoover)
Evergreen Scrub
7 Ggo/ 4 W B spread 0 maturity
Minimal to Moderate Gator
Very touga Curdy groundcovar
Uga blue floCom horn lata Winter tonugO
Spring
Mu❑enbergle IitdDim.ri'Auwmn GloO'
Muh/y Grass
Perennial Grass
4 OgO/ 4 Olde (stalks may re -Oto 5)
Minimal Oster
Amber colored Blow ,Wiles In Autumn
Selected for on-site drainage soots areas
(oan M. in out areas despite minimal
DaterreDlr.ment)
PDrtnium'Mead Maiden'
Na.Zea/erd Flax
Long4iwd Perennial
4 C190/ 5 ❑ de 0 maturity
Minimal to Moderate Cater
2. Olde strap ,0cpcd leaves in varying
sold., of -for. cOetly bronzy red, cream 0
pink O/olive loaf etlgos
Very Wug00 tolerant of poor caMYions
Caton.aster dommed'loOfast
Bealway0ohovessis, (Groundwve,)
Evergreen Snub
1' Ogal laosp.ad 0 maturity
Minimal aster
Estmaslawytoug4 Drdygreandoo—O
IivevmWyofCoton...ler
Tiny ODO BoOersin Spr ngOed b.mW. in
lata Fall
TulbagOa vi,Iw,a
NNNG TREES WILL NOT BE BALVA GED &YTO POD"RILLTHA00"R'INC0MPA nBLEu
society Gadro
LOCATION DUE TO PROPOSED SITE GRADING 0 NEW ORAINAG E FACILITIES. READERS ATTENTION
Perennial fl R/tlmme)
ISREFERRED TO THE ARBORIST REPORT (PREPARED BY0IKE MINNICK, ISA CERTIFIED ARBORIST
VM -11830A), ACCOMPANYING THIS SUBMITTAL FOR ADDITIONAL INFORMATION ABOUT EXISTING
78'tlg000ke0 maturity
TREE SPECIES ON SITE.
EXISTING SOILS SHALL BE AMENDED PRIOR TO PLANTING PER RECOMMENDATIONS FROM SOIL
Minimal Is Moderate Qatar
NUTRITION REPORT. SOIL SAMPLES FROM PLANTER AREAS TO BE SUBMITTED TO A SOILS IAB
Very WugoL Long-lived plant¢an survive
FOR NUTRITIONAL ANALYSIS AND RECOMMENDATIONS.
OBOonly xcasianal Oster
ALL NEW LANDSCAPED AREAS TO BE TOP -DRESSED WITH A 3' LAYER OF RECYCLED BARK
Pala lavender floor,
MULCH. NO PLASTIC SHEETING OR IMPERMEABLE SURFACING SHALL BE ALLOWED BENEATH
yearround,..A.st
In Spring and Summer.
BARK MULCH. -
NEW LANDSCAPE PLANING WILL BE IRRIGATED USING NETAFIM TECHUNE (DRIPUNE) ON AN
AUTOMATICALLY OPERATED IRRIGATION SYSTEM NEW TREES WILL BE IRRIGATED USING LOW
ClYtestores callaleg oldos
FLOW BUBBLERS SET IN VERTICAL PERFORATED TUBES TO ENCOURAGE DEEPER ROOT GROWTH.
Violet r—pet v .
NEW IRRIGATION SYSTEM WILL INCORPORATE AN AUTOMATIC IRRIGATION CONTROLLER WITH
Evegroen V no
WEATHER -SENSING CAPABILITY FOR OPTIMAL WATER SAVINGS.
Strong groCng vine but easily kept in cOcck
ALL PLANT MATERIAL SELECTED FOR THIS SITE IS COMPATIBLE WITH NORMAL CLIMATIC
oitoccossionalpmnng. Runners can g,Q
CONDITIONS FOR SANTA CLARA COUNTY. NONE OF THE SELECTED PLANS ARE REPORTEDTO
19'n a g.0ing sween
BE UNSUALLY SUSCEPTIBLE TO PEST INFESTATION. VIRUSES OR DISEASE
Regular nater
PLANT MATERIAL SELECTED FOR THIS PRO ECT GENERALLY HAVE A LOW TO MODERATE WATER
USERATE. NO LAWN TURF OR HIGH-WATER USAGE PLANTS ARE PROPOSED FOR THIS SITE.
Violet and OOW flo0.m In Spdrg.
01,
@Sig 8aiurs
BankofAmerica''�
Homestead Road
New Store
21020 Homestead Road
Cupertino, CA 95014
SERIAL NUMBER: CA
NRSP VERSION: 2.0
BULLETIN: 2017-2
2101 Webster Street
Suite 2000
ns
Oakland, CA 94612
GeTelehom, 111.121.1411
nsler Facsimile 510.625.7499
Landscape Architccrae:
Pavement Engineering inc.
You ran side on our mputalion
b, ::
WS SSpraamnroU a,S
H 81OW.spo, CA BNOIAalS
B8S)Bf-TT65
PaRm.. E.13—rWQinc.
Atm: Ofwdun Edholm, Probst Nlca.ae
30L0 Cpres, Ori¢, Suite 3
P.Wl—CA 91954
T. 707.769.5330
F.msB: Mcosh... poOsncntenoncerinOcom
lards., A.M-1: Mike Wesdm
Liceme:CAO" EGP.10010010
' Issue Dara a Issue Descdprion By Check
Ot 5120/17 MPW MPW
Pre -Planning Submittal '
02 10/11117 MPW MPW
Planning Submittal #2
)e Nanta i—�—
�� I I(Ame�a• on si kJAad Road
Cas,. I
SHEET L.01
€__
"CITVSTONECOMBWBYPAVESTONE. Available ina wri.ry offinishes, this paver combo brings style and dimension to architectural servings. City St.n —ba used
W, -n binalion modules of symmetrical squares and rectangular shapes to create extraordinary pattoms and mbas dosigns. This paving p,U,,n combines M, 6x12"
City Ston. Rectangl., [ho 12',12" CityStone Square, and the 6x9- City Stan, R.ctangl..
US FOUNDRY -ADA COMPUANT TREE GRATE(MODEL9501). Cast iron tree grata. 48'sOraro, ADA oampliant to, ..[king sudaces.
3x3
(TYP )
;I I
I
I I
ECO-MESHDScre,ns or, mad. with a heavy 0.12wovoniremost, screenvnth,aniquo bridge win, far st.biliarrii—This gaagois2-1/2limesstrangerthan.080wire found in t' /L � � -7—gq
c.mp.bngpraductsOurspaculint.rcdmp.eaveprovdest@fl,xblitYpt.nl Screemre0ire.ndelmmalesbmkon Ueldst®twnoccurinotl rbrand, qqq ^/� && �ll+++���
ECO-MESHDscmonsar.(mm.donfoursdesbydur.blel6gaugom.txleh,n,,lwhrchls25%ho.viarthanl8gaugofmm.eommonlyfo,,d noth,rproducls. 9�C i g a�
d� mate
sx+rara�F„""] 9
dr.•! L�yg W.a _ ..
DAVIS Concrete .1., #375, SO Tan _ - :r ><
Ws::zse d�cil�' E'
STEEL POST 0 4'-S' O.C.
STEEL MESH PANEL ECO -MESH
BY McNICHOLS CORPC4' WIDE,
6 TALL, DARK GREEN
mum
BankofAmerica''�
Homestead Road
New Store
21020 Homestead Road
Cupertino, CA 95014
SERIAL NUMBER: CA
NRSP VERSION: 2.0
BULLETIN: 2017-2
2101 Webster Sheet
Suite 2000
Oakland, CA 94612
Gensler Telephone 510.625.7400
Focsimile 510.625.7499
L.orl cape Amhib.e:
Pavement Engineering Inc.
You can ride on our reputation
oryaca
COr rd
BQBS Sammenr. arNe. BulreA
m- -1., CA ssial—
B"7813Z65
Amr 3o [hao Ed dn.l...
Ann: ED.s rata, Slit.
plana@r
Pno
I -lapse N95 Sui1c3
Pccaluma, CA ?1951
T: ]07-]69-5330
E- its mnananc. w@m.mm0nccdo.com
latak. c A.Itilcn: Nlike Ward-
Uccmc:CA01569 G[p. 1001001❑
Iss.a Oat.dlss.. DescdOnon By oh.ck
01 5126117 MPW MPW
Pre -Planning Submittal
02 10111117 MPW MPW
Pianning Submittal.2
s.allelgnatun
Pml.n Hama
Bank afAmnsa-Homestead Road
1—a—u-1
IP1.rotype LaY.m
D-0pro-
DECORATIVESURFACE TREAMENTS
'a
ASSHOWN
SHEET L.02
%H.m,. K.w." wi:wc u..o w'tli'wco'�d&.Cw:u`d°vYo`dcoAiin
{sae
21
� �
1/e e23
1 /J 481/8
24
�i 1/2
ae
�1/a
US FOUNDRY
_
/2 �Y3� I� ( SiiP
USF 9501 TREE GRATE^
ADA Com taint
32
at,
2 03-05-11
ULS
acv: 0 0, mo¢.
US FOUNDRY -ADA COMPUANT TREE GRATE(MODEL9501). Cast iron tree grata. 48'sOraro, ADA oampliant to, ..[king sudaces.
3x3
(TYP )
;I I
I
I I
ECO-MESHDScre,ns or, mad. with a heavy 0.12wovoniremost, screenvnth,aniquo bridge win, far st.biliarrii—This gaagois2-1/2limesstrangerthan.080wire found in t' /L � � -7—gq
c.mp.bngpraductsOurspaculint.rcdmp.eaveprovdest@fl,xblitYpt.nl Screemre0ire.ndelmmalesbmkon Ueldst®twnoccurinotl rbrand, qqq ^/� && �ll+++���
ECO-MESHDscmonsar.(mm.donfoursdesbydur.blel6gaugom.txleh,n,,lwhrchls25%ho.viarthanl8gaugofmm.eommonlyfo,,d noth,rproducls. 9�C i g a�
d� mate
sx+rara�F„""] 9
dr.•! L�yg W.a _ ..
DAVIS Concrete .1., #375, SO Tan _ - :r ><
Ws::zse d�cil�' E'
STEEL POST 0 4'-S' O.C.
STEEL MESH PANEL ECO -MESH
BY McNICHOLS CORPC4' WIDE,
6 TALL, DARK GREEN
mum
BankofAmerica''�
Homestead Road
New Store
21020 Homestead Road
Cupertino, CA 95014
SERIAL NUMBER: CA
NRSP VERSION: 2.0
BULLETIN: 2017-2
2101 Webster Sheet
Suite 2000
Oakland, CA 94612
Gensler Telephone 510.625.7400
Focsimile 510.625.7499
L.orl cape Amhib.e:
Pavement Engineering Inc.
You can ride on our reputation
oryaca
COr rd
BQBS Sammenr. arNe. BulreA
m- -1., CA ssial—
B"7813Z65
Amr 3o [hao Ed dn.l...
Ann: ED.s rata, Slit.
plana@r
Pno
I -lapse N95 Sui1c3
Pccaluma, CA ?1951
T: ]07-]69-5330
E- its mnananc. w@m.mm0nccdo.com
latak. c A.Itilcn: Nlike Ward-
Uccmc:CA01569 G[p. 1001001❑
Iss.a Oat.dlss.. DescdOnon By oh.ck
01 5126117 MPW MPW
Pre -Planning Submittal
02 10111117 MPW MPW
Pianning Submittal.2
s.allelgnatun
Pml.n Hama
Bank afAmnsa-Homestead Road
1—a—u-1
IP1.rotype LaY.m
D-0pro-
DECORATIVESURFACE TREAMENTS
'a
ASSHOWN
SHEET L.02
:E
SEE PG&E DR11f M,
FOR CONTMAOGNI
1
1
1
I
i
- curt
F1�B L 1
I
I
I
1
PROIARY FEEDERS
I
i
1
1
I ' I
i
-- I
I
1
PGK CLEARANCE AROUND—'�
UM VWLT
-_. _.... S' CONDUIT—'t
SECONDARY FEEDERS
I
NEW 400/A f L -
lPH, 4WW SERVICE SERVILE
•• III
S#l'Sri�JY ie9.:.1�
i \
UCR4 :JCR,} UCR2 I I 1
UCF.6 ACRS 588 IIp�Ht. FSF ACR'. � V 1�'
FICLF N \
DREAM. RM.
WAITING
ENE]
AM
0
3
N
FF@ FINI i
I I
,
PROPOSED PARKING ` M
1
aFI03
I
i
3W
I
S'
P TVAL
DRC/A14
Signature
ApplieaEioo Number
/b,e'4 —/�
Case I'+ VIEIgc�1:
ELECTRICAL SITE PLAN
SHEET KEYED NOTES
BUILDING COMMISSIONING
ARC ,62.7'
7',Q4.3 SaN tf�P;
h '
cll2 . r L EIN. -:71 'A'37-
OF THE WORK AND FULLY INFORM THEMSELVES OF ALL CONDITIONS THAT EFFECT THE WORK
ANCOST THEREOF, AND EXAMINE THE DRAWINGS AND SPECIFICATIONS AS RELATED TO THE
r.:in2' BE:N?2.+t•'. vT> D'ILv =
O (E) UiLTY 7RANSIMIER TO BE REMOVED.
SITE CONOITIONS.
CD1 DNATE TEMOVAL " PC.
PERFORMING THESE SERVICES
ONEWUm VAULT FOR UNDERGROUND URUTY IRARSFDKTR
It, TRAFRC—RATED COVER AND ASSEMBLY. VERIFY WIN PG&E ORAWNGS
3W
I
S'
P TVAL
DRC/A14
Signature
ApplieaEioo Number
/b,e'4 —/�
Case I'+ VIEIgc�1:
ELECTRICAL SITE PLAN
SHEET KEYED NOTES
BUILDING COMMISSIONING
1. CONTRACTOR PROPOSING TO UNDERTAKE WORK UNDER THIS DIVISION SHALL VISIT THE SITE
7',Q4.3 SaN tf�P;
h '
A. TESTING AND ADJUSTING - TESTING AND ADJUSTING OF SYSTEMS SHALL BE PERFORMED IN ACCORDANCE
OF THE WORK AND FULLY INFORM THEMSELVES OF ALL CONDITIONS THAT EFFECT THE WORK
ANCOST THEREOF, AND EXAMINE THE DRAWINGS AND SPECIFICATIONS AS RELATED TO THE
Pt-5m
WITH INDUSTRY BEST PRACTICES AND APPLICABLE STANDARDS OF EACH SYSTEM AS DETERMINED BY THE
BUILDING OFFICIAL PROVIDE A FINAL REPORT OF TESTING SIGNED BY THE INDIVIDUAL RESPONSIBLE FOR
SITE CONOITIONS.
c QAYFCTRHGI'pT
PERFORMING THESE SERVICES
2. CONSIDERATION WILL NOT BE GRANTED FOR ANY ALLEGED MISUNDERSTANDINGS OF THE
Bank of America -Homestead Road
B. OPERATION AND MAINTENANCE (O&M) MANUAL - PROVIDE THE BUILDING OWNER OR REPRESENTATIVE WITH
AMOUNT OF WORK TO BE PERFORMED. TENDER OF PROPOSAL SHAD. CONVEY FULL
AGREEMENT TO THE ITEMS AND CONOITKM INDICATED ON THE DRAWINGS. SHOULD THE
IMEDIUM
DETAILED OPERATING AND MAINTENANCE INSTRUCTIONS AND COPIES OF GUARANTIES/WARRANTIES FOR EACH
CONTRACTOR FIND DISCREPANCIES OR OMISSIONS IN THE CONTRACT DOCUMENTS OR BE IN
SYSTEM. O&M INSTRUCTIONS SHALL BE CONSISTENT WITH OSHA REQUIREMENTS IN CCR, TITLE B, SECTION
DOUBT AS TO THE INTENT THEREOF, HE SHALL IMMEDIATELY 013TAIN CLARIFICATION FROM THE
16'
5142. AND OTHER RELATED REGULATIONS
ENGINEER AND/OR OWNER'S REPRESENTATIVE PRIOR TO SUBMITTING NS PROPOSAL FOR
WORK
C. INSPECTIONS AND REPORTS - INCLUDE A COPY OF ALL INSPECTIGNS, VERIFICATIONS AND REPORTS, REQUIRED
A FIELD VERIFY EXACT NAMEPLATE DATA ON ALL EQUIPMENT FMRNSHED UNDER OTHER
BY THE ENFORCING AGENCY.
DIVISIONS AND/OR BY THE TENANT O.E. HVAC EOUHPIAENT, KITCHEN EOUIPMENT, COMPUTER
EOUIPMENT. ETC...) PRIOR TO THE INSTALLATION OF ELECTRICAL WORK AND MAKE ANY
AWLM MENTS TO OUTLETS. CONDUTTS. WIRE AND/OR CIRCUIT BREAKER AS REQUESTED TO
MATCH EOUIPMEM ACTUALLY FURNISHED.
4. REFER TO SPECIFICAPO S SECTION 16110 FOR UNDERGROUND CONDUIT REQUIREMENT.
i ALL CONDUCTORS SHALL BE COPPER CONDUCTORS FOR ABOVE GROUND SUMCE SALL BE
THM - THWN. CONDUCTORS FOR BELOW GRADE SERVICE SHALL BE THIN OR XHHW.
CONDUCTOR III) AND SMAI.ER SOUL BE SOLID. CONDUCTORS /B AND LARGER SHALL BE
STANOEDk,
E PI
E-0.0 SIEE73 SITE .W
EP-1.SITE PHOTO METRIC
IF-ty PHOTONETRNG GUTSIEEIS
CALGREEN BUILDING CODE REQUIREMENTS
SHEET GENERAL NOTES
SHEET INDEX
Bank of America -;Qp-
Homestead Road
New Store
21020 Homestead Road
Cupertino, CA 95014
SERIAL NUMBER: CA
NRSP VERSION: 2.0
BULLETIN: 2017-2
21011W.115OM
Gensler Tl ph.. 510.6x3.7413
Fud,nile: 510.625.7499
11L ssuD Date 6lssuc Oescnpl on By
CI0012412017
PLANNING COMMENTS
I=�
AGES✓RR0FFS6q
ENGINEERING
7',Q4.3 SaN tf�P;
h '
1711 acdl StreN
sDOta4.)5
N0.E015418
Pt-5m
MLMLM
(401) 522Z-
IDTDl ledec.001
c QAYFCTRHGI'pT
COPAi9�IQ20D
_ OF CALIE a
Bank of America -Homestead Road
IPmtoHDO LDYDuI
IMEDIUM
IDesctlptlOn
SHEET INDEX & SITE PLAN
IIssc
1 r.L,�®
I f1
0 2' IC IT
16'
E -U.0
Ref. NOrlh
DATE OF FIELD SURVEY
APRIL 15, 2017
SURVEYOR'S STATEMENT
THIS MAP WAS PREPARED BY ME, OR UNDER MY DIRECTION, IN CONFORMANCE WITH THE
PROFESSIONAL LAND SURVEYORS' ACT.
J. MAY, PLS 8570
03/31/2019
DETECTOR
-- - - - - - - FL
225.42' -
TC E
22589'
Bw E
225.95
Tc S
DATUM STATEMENT
COORDINATES SHOWN ARE BASED ON CALIFORNIA STATE PLANE NORTH AMERICAN DATUM (NAD83)
ZONE III, (EPOCH 2011.00). ALL MEASURED DISTANCES SHOWN ARE US SURVEY FOOT GRID DISTANCES,
UNLESS OTHERWISE NOTED. TO OBTAIN GROUND DISTANCES DIMDE GRID DISTANCES BY A COMBINATION
FACTOR OF 1.000067014
20' 10' 0' 20' 40'
GRAPHIC SCALE: 1 INCH = 20 FT
BASIS OF BEARINGS
THE BASIS OF BEARINGS FOR THIS MAP IS THE MONUMENT LINE OF
CHERRY STREET, AND TAKEN AS NORTH 89'08'14' WEST, FROM FOUND
MONUMENT POINT 106.
REFRENCE
11) 167 ROS 23
BOOK 167 MAP 23
HOMESTEAD ROAD (90' WIDE)
�[� 106
-�- - - - - - - _ - - - -�ST BM
I
-ELECTRIC CABINET
_ TC E
.99'
v
BW S224
.. .. N
�4�. 22
N225.4`
225.51'
,.+ N8
m
100
+225.225.1
223.45
PACBELL EASE 1^�
101
DOC NO. 13769176
220.25
AT&T UNDERGROUND
102
CABLE BOX W/CONC.
224.10
PLATFORM
103
24' PAW
224.82
p. 5
104
TC
224.57
225.27
24' PAW -
d 5 225.21
8' CHAINUNK FENCE --
DI 275"
GRATE EL =223.49 -
INV. EL =220.89 225'15
INV. 6' RCP OUT (E) = 221.64 TC
225.12' -
TC _
225.17
1C
225.29'
24' PAW -
DL 5'
DUMPSTER ARE
2L ! MMXIOU2S�
ELECTRIC CABIN.
VICINITY MAP
« 223.8•
35'
DL
TD Bw S Tc OB
224.SC Tc
224.47 22el 223.50'
Tc
224.26' Tc
57 224.26' 224.13' T�BB, DETECTOR
DRIVE Bw • E TC GB
+..67, �,) 2u47 CROSS WALK BUTTON
25
s TC 129.17
p' 224.87 NM 224.7' + i
22 73 7 . t LAWN
+ 224.D' ■ 7C
\j + 225.5'
11224.92' 25 '^/ DL 15' ? + 8114 +224.2• 22292'
J If DEMUOItr''24' DEcmuous m 22155' 224.7 1 0B
_.... DL 1:f / LEGEND
.� 4 p e ny f DL 15 lg.90el0 221.2,' i
r 725,42' 7C '2 m-?�o°P• 225,E
2z 75 1 ,/! %, f! f /" / 'i ' / `�•Oo, lour x azx21' ELECTROIJER WITH ARM
Bw is DI 122
_4,• X22_121 GRATE EL 223.22 d" WATER METER
/ / 22139' 22M 122 INV. EL = 219.42
Sx --
/ BUILDING OVERHAN BW INV. RCP IN219.62 TREE
24
! 43. I INV. 24' RCP OUT (N (NE) 216.92
BUILDING TC ssD
FF=225.69223.27 ® FIRE DEPARTMENT CONNECTION
+ I+224.27 /
2 4."3 ` / 1 I .1 POST INDICATOR VALVE
m 2' PARCEL B / LAWN 'B
167 ROS 23 2: ELECTRDUER
22169' / GAS SERVICE Bw,Q2s` �' CATCH BASIN
+=in.3.:• BUILDING OVERRAN
tea. o' - S Z
/ TC E 22150'
AC PAVEMENT / . E51
' - mss.. o c 24 DEC�UOUS I , (./) d" GAS METER
22& -DL 10'
9 22,.E to I l O SANITARY SEWER CLEANOUT
DOORCONC. WALKWAY 22143'
TC ESC 0 725�- ".�•• •
_BW E
22 iV �•'�' n. - 1C T� �''� I z TRAFFIC SIGNAL LIGHT
2.S.C7' 22y,�. 1C B WALK 28.
27517 ?254 1044ry 225.49' 1C s
o
"' PARKNG LOT 214- TC �- TC 52211 7
mc ; ' 224.92' \b 224.67' +2"<4.5.f' ?2355' /+22 U" 3 221W Q D WATER VALVE
.13' ' 224.17' 4 224.23' AC_ A ENT �-' I 1
224.51' b O UNKNOWN VAULT
M ESC is
225.15E + 224.39` +224.8£ +224.73' + 22.4.33• 4.tB 7f 102
CINDER BRI K W__-
22168'
FL s X ON cuBB SIGN
z4.ia'
TC +22, ' �f TC 5273.68' I -(�
215. 11 17Bn 22178'
TC E C• 224. T� TC E
-
225.01'225-41 O TOWILL CONTROL
22{.95 TC 275 224.59• TC p-1' 224.13
4.B7 224 35' 7C FL E
N 89'47'0 ' E f5Y 15' 224.4 22168' +o+ FIRE HYDRANT
1' TC E
'IV41' 134.1
Z 215.05' 8' TREE '' 21155'
22513' d. 1' DL t' ?6 , . � 41 R 5m9 I TRAFFIC SIGNAL
rvicus +"s.2• ELECTROLIER :,. 22e.rs 93 fu.Im
Y
B' CHAINUNK FENCE ON 24' CONC.
BASE TELEPHONE VAULT
,. +..�
TC s
11151 I
cr GAS METER
DI 1058
PARCEL A GRATE = 223.71
=
INV. EL = 22D.71 , � I � GAS VALVE
INV. 6' RCP IN (W) = 220.74
167 ROS 23 INV. RCP OUT (N) - 220.64
CURB RAMP
� I I
(
y1•'i]�7 W/PM UNDERGROUND WATER PAINT MARK
,7.- G/PM UNDERGROUND GAS PAINT MARK.
O O O FENCE
D' ` UNDERGROUND STORM DRAIN PAINT MARK
1 I
L_
ABBREVIATION
AC ASPHALT
TC TOP OF CURB
FL FLOW UNE
GS GRADE BREAK
CONC. CONCRETE
SSC START SMOOTH CURVE
ESC END SMOOTH CURVE
S START
E END
o
am0 O
moC, U
�9 un
V)w�N
�
6
f6
-200
T U o 1fl
0) O U j
Z pN
c\I
n
w O
N m
W ISA Z �
n
N O 90
O
SHEET [
OF 1
SURVEY CONTROL
POINT#
DESCRIPTION
ELEVATION
NORTHING EASTING
100
CUT X
223.45
1949002.90 6113486.60
101
CUT X
220.25
1948631.90 6113585.18
102
X ON CURB
224.10
1948877.97 6113499.61
103
N/S
224.82
1948905.68 6113388.97
104
N&S
224.57
1949017.31 6113392.50
105
CITY BM 16
1 223.26
1948987.20 16113502.82
106
ST BM
222.53
1949062.34 6113548.77
1002
END ST MON
227.1D
1949069.73 6113057.90
1003
FND S7 MON
228.15
1949074.31 6112727.08
5019
ED RCE 10007
223.14
1948848.34 6113499.53
22 73 7 . t LAWN
+ 224.D' ■ 7C
\j + 225.5'
11224.92' 25 '^/ DL 15' ? + 8114 +224.2• 22292'
J If DEMUOItr''24' DEcmuous m 22155' 224.7 1 0B
_.... DL 1:f / LEGEND
.� 4 p e ny f DL 15 lg.90el0 221.2,' i
r 725,42' 7C '2 m-?�o°P• 225,E
2z 75 1 ,/! %, f! f /" / 'i ' / `�•Oo, lour x azx21' ELECTROIJER WITH ARM
Bw is DI 122
_4,• X22_121 GRATE EL 223.22 d" WATER METER
/ / 22139' 22M 122 INV. EL = 219.42
Sx --
/ BUILDING OVERHAN BW INV. RCP IN219.62 TREE
24
! 43. I INV. 24' RCP OUT (N (NE) 216.92
BUILDING TC ssD
FF=225.69223.27 ® FIRE DEPARTMENT CONNECTION
+ I+224.27 /
2 4."3 ` / 1 I .1 POST INDICATOR VALVE
m 2' PARCEL B / LAWN 'B
167 ROS 23 2: ELECTRDUER
22169' / GAS SERVICE Bw,Q2s` �' CATCH BASIN
+=in.3.:• BUILDING OVERRAN
tea. o' - S Z
/ TC E 22150'
AC PAVEMENT / . E51
' - mss.. o c 24 DEC�UOUS I , (./) d" GAS METER
22& -DL 10'
9 22,.E to I l O SANITARY SEWER CLEANOUT
DOORCONC. WALKWAY 22143'
TC ESC 0 725�- ".�•• •
_BW E
22 iV �•'�' n. - 1C T� �''� I z TRAFFIC SIGNAL LIGHT
2.S.C7' 22y,�. 1C B WALK 28.
27517 ?254 1044ry 225.49' 1C s
o
"' PARKNG LOT 214- TC �- TC 52211 7
mc ; ' 224.92' \b 224.67' +2"<4.5.f' ?2355' /+22 U" 3 221W Q D WATER VALVE
.13' ' 224.17' 4 224.23' AC_ A ENT �-' I 1
224.51' b O UNKNOWN VAULT
M ESC is
225.15E + 224.39` +224.8£ +224.73' + 22.4.33• 4.tB 7f 102
CINDER BRI K W__-
22168'
FL s X ON cuBB SIGN
z4.ia'
TC +22, ' �f TC 5273.68' I -(�
215. 11 17Bn 22178'
TC E C• 224. T� TC E
-
225.01'225-41 O TOWILL CONTROL
22{.95 TC 275 224.59• TC p-1' 224.13
4.B7 224 35' 7C FL E
N 89'47'0 ' E f5Y 15' 224.4 22168' +o+ FIRE HYDRANT
1' TC E
'IV41' 134.1
Z 215.05' 8' TREE '' 21155'
22513' d. 1' DL t' ?6 , . � 41 R 5m9 I TRAFFIC SIGNAL
rvicus +"s.2• ELECTROLIER :,. 22e.rs 93 fu.Im
Y
B' CHAINUNK FENCE ON 24' CONC.
BASE TELEPHONE VAULT
,. +..�
TC s
11151 I
cr GAS METER
DI 1058
PARCEL A GRATE = 223.71
=
INV. EL = 22D.71 , � I � GAS VALVE
INV. 6' RCP IN (W) = 220.74
167 ROS 23 INV. RCP OUT (N) - 220.64
CURB RAMP
� I I
(
y1•'i]�7 W/PM UNDERGROUND WATER PAINT MARK
,7.- G/PM UNDERGROUND GAS PAINT MARK.
O O O FENCE
D' ` UNDERGROUND STORM DRAIN PAINT MARK
1 I
L_
ABBREVIATION
AC ASPHALT
TC TOP OF CURB
FL FLOW UNE
GS GRADE BREAK
CONC. CONCRETE
SSC START SMOOTH CURVE
ESC END SMOOTH CURVE
S START
E END
o
am0 O
moC, U
�9 un
V)w�N
�
6
f6
-200
T U o 1fl
0) O U j
Z pN
c\I
n
w O
N m
W ISA Z �
n
N O 90
O
SHEET [
OF 1
9 P u`M c L
14H,
Signature
C.3 AREA CALCULATIONS
TOTALPROPOSED IMPERVIOUS SURFACE AREA: 145 SF
PROPOSED PERMEABLE PAVERS AREA: 1135 SF
PERCENTAGE OF CATCHMENT AREA: 7.e%
LEGEND
DAREA
OF BIORETENTION BASIN
• • • • • • .
ACCESSIBLE PATH OF TRAVEL
EG
EXISTING GRADE
EP
EDGE OF PAVEMENT
FL
FLOWUNE
FG
FINISH GRADE
SW
SIDEWALK SURFACE
TC
TOPOFCURB
DESIGN ELEVATION
�X)0f=
.5.44x.
EXIST ELEVATION
Bankof America "01
Homestead Road
New Store
21020 Homestead Road
Cupertino, CA 95014
SERIAL NUMBER: CA
NRSP VERSION: 2.0
BULLETIN: 2017-2
2101 Webster Street
Suite 2000
111.1-; 0A 94612
Gensler Telephone 510.625.7400
Facsimile 5IO.625.7499
Pavement Engineering inc.
0 You can ride on our reputation
c—. olr
saassaoamer4oDms. simaa
Sen LWa ObLSPa CA 9.TJOlam16
B6S781-1365
Pavement E.&.A, lnc.
AM: JormlhanE IMM, Pmjcct hlarmg,
3920 Cypmaa Ddw, Suit, 3
Peial— CA 9,1954
T: 707-769-5330
E-mail:jorcsflcm. dPavcmrntenginecrmg—
Engiaea ofR=M: Jouph L. Ririe, PJE
Uxme:CA52735 Ep. 17/31r2018
J0ISaD ey c
01 512512017JRE NIPW
Flowing Revievl
' Protect Name
Bank of Amedra-Homestead Road
tlPro,.et Numeer
```Prototype wyeut
[Desc4ptlon
EXTERIOR SITE IMPROVEMENTS
{sc
ASSHOWN
SHEET C.1
020150ensler