HomeMy WebLinkAboutAH Packet 10-26-17 CITY OF CUPERTINO
AGENDA
C U P E RT I N D ADMINISTRATIVE HEARING
10300 Torre Avenue, City Ha❑ Conference Room C
Thursday, October 26, 2017
5:00 PM
REVISED-at 4:OOpm to make changes to the Draft Minutes document
ROLL CALL
APPROVAL OF MINUTES
Subject: Draft Minutes of June 8, 2017
Recommended Action: approve or modify the Draft Minutes of June 8, 2017
Draft Minutes of June 8 2017
POSTPONEMENTS
Subject: Architectural and Site approval to allow exterior building and site
modifications to an existing Jack in the Box restaurant. Application No(s):
ASA-2017-07; Applicant(s): Greg Borchardt (Albert Tung); Location: 1451 S De
Anza Boulevard APN# 366-19-044 per the applicant's request, Postponed to the
November 9, 2017 meeting
ORAL COMMUNICATIONS
This portion of the meeting is �eserved for persons wishing to add�ess the membe�s on
any matter not on the agenda. Speakers are limited to three (3) minutes. In most cases,
State law will prohibit the members f�om making any decisions with �espect to a matte�
not listed on the agenda
WRITTEN COMMUNICATIONS
PUBLIC MEETINGS
Subject: Architectural and Site approval to allow exterior building and site
Page 1
Administrative Hearing AGENDA October 26,2017
modifications to an existing Jack in the Box restaurant. Application No(s):
ASA-2017-07; Applicant(s): Greg Borchardt (Albert Tung); Location: 1451 S De
Anza Boulevard APN# 366-19-044 per the applicant's request, Postponed to the
November 9, 2017 meeting
Subject: Architectural and Site Approval to consider the construction of a new
4,172 square feet Bank of America branch building to replace an existing 5,265
square feet multi-tenant commercial building, including associated site and street
frontage improvements including a paved plaza area at the northeast corner of the
site and a Tree Removal Permit to allow for the removal of 14 protected trees.
Application No(s).: ASA-2017-OS and TR-2017-39; Applicant(s): Whitney Marr
(C&L Investments, LLC); Location: 21020 Homestead Rd APN# 326-07-020
Recommended Action: That the Hearing Officer:
1. Find that the proposed actions are exempt from CEQA; and
2. Adopt a resolution to approve the Architectural and Site Approval and Tree
Removal permits in accordance with the draft resolutions (Attachments 1 and 2).
Administrative Hearing Officer's decision final unless appealed
Staff Report
1 -Draft Resolution for ASA-2017-OS
2 -Draft Resolution for TR-2017-39
3 -Plan Set
4-Written Public Comments
OLD BUSINESS
NEW BUSINESS
ADJOURNMENT
Page 2
Administrative Hearing AGENDA October 26,2017
In compliance with the Americans with Disabilities Act (ADA), anyone who is planning
to attend the next meeting who is visually or hearing impaired o� has any disability
that needs special assistance should call the City Cle�k's Offzce at 408-777-3223, 48
hours in advance of the �neeting to arrange for assistance. Upon �equest, in advance,
by a pe�son with a disability, meeting agendas and writings distributed fo� the meeting
that are public �eco�ds will be made available in the appropriate alte�native fo�mat.
Also upon request, in advance, an assistive listening device can be made available for
use du�ing the meeting.
Any writings or documents provided to a majority of the members after publication of
the agenda will be made available for public inspection. Please contact the City
Clerk's Office in City Hall located at 10300 To�re Avenue during normal business
hou�s.
IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal
Code 2.08100 written communications sent to the Cupertino City Council,
Commissioners or City staff concerning a matte� on the agenda are included as
supplemental material to the agendized item. These written communications are
accessible to the public through the City's website and kept in packet archives. You are
he�eby admonished not to include any pe�sonal or private information in w�itten
communications to the City that you do not wish to make public; doing so shall
constitute a waiver of any privacy rights you may have on the information provided to
the City.
Members of the public are entitled to address the membe�s conce�ning any item that is
described in the notice or agenda for this meeting, before or du�ing consideration of
that item. If you wish to address the membe�s on any othe� item not on the agenda, you
may do so du�ing the public comment.
Page 3
Cupertino, CA 95014
(408) 777-3308
ACTION MINUTES OF THE REGULAR MEETING OF
THEADMINISTRATIVEHEARING HELD ON June8, 2017
ROLL CALL
Hearing Officer present: Catarina Kidd, Senior Planner
Staff present: Ellen Yau, Assistant Planner
Applicant(s) present:
APPROVAL OF M IN UTES:
1. M inutes of February 23, 2017
Theminutesof February 23, 2017wereapproved aswritten
POSTPON EM EN TS�REM OVA L FROM CA L EN DA R:
N one
ORAL COMMUNICATION:
N one
WRITTEN COMMUNICATIONS:
N one
PUBLIC HEARING ITEMS:
2. Application No.(s): U-2017-05
Applicant: Mark Dimalanta (Cupertino Property Development)
Location: 10088 N Wolfe Rd #130 APN#316-20-108
Use Permit to allow for additional outdoor seating to a previously approved patio area to
include two (2) additional tables for a total of four tables and 32 seats at an existing restaurant
(Steins Beer Garden) located in the N ineteen800 mixed use development project
Administrative Hearing decision final unless appealed.
2 Administrative Hearing
Ju n e 8,2017
Staff Member Serrano presented the Staff Report to the Hearing Officer. The applicant would
liketo modify their existing current after school day careoperationsfrom 12 (noon) to 6:30 pm
with a maximum of 90 students, as per Planning Commission approval in 2009, to an all-day
private daycare/afterschool care program with a maximum 70 students, aged 2 to 6 years, and
8 Staff inembers. They would also like to add a play area and a play structure. The daycare
operations require 11 parking spaces and parents are required to use the on-site spaces when
dropping off or picking up their children. The church operations require 57 spaces, so there is
ample parking on site to allow for both daycare and church office operations should both
activities be occurring at the same time. The site is Zoned Quasi-Pubic (BQ). It is surrounded
on the east, west and north by singlefamily residences and on the south by Jollyman Park. The
City'strafficEngineer reviewed theproject and believesthat thetrafficadded during morning
or afternoon peak traffic commute hour is minimal. Additionally, with the reduction in
students, no traffic mitigation measures are required. The proposed play structure is 14' in
height and will be set back 55' from the nearest residential property, located to the east. A
Noise Study was prepared by the City's Acoustic Consultant. This study determined that the
decibel levels were expected to be intermittent and between 50 to 60 decibels at 30 to 40 feet
within the play yard. Dueto thewooden fences, the decibel level would drop 12 to 13 decibels
in the yards of the closest residences. This noise level does not require mitigation measures.
The project was properly noticed for a public hearing and in addition the property owner
conducted two outreach meetings to help explain the project to their neighbors. Staff has
received questions regarding the project concerning; permitted uses, expiration of permitted
uses, noise and parking and traffic and safety. The Sheriff's office was informed of the safety
concerns. They stated that the Church property has not been a safety issue in the past. The
other concerns have been addressed in the Staff Report. Staff supports approval of the project
as it meets all of the City's Municipal Code requirements and the conditions of approval
addressesand/or mitigatesother concernsraised.
The Hearing Officer confirmed that the prior approval was for 90 students to be on site from
12 (noon) to 6:30pm and that the new proposal is to have 70 students on site from 7:OOam to
6:30pm. He clarified the number of parking spaces and the distance from the play structure to
the nearest home.
DECISION: Theapplication wasapproved by the Hearing Officer per thedraft resolution with
thefollowing additions/modifications:
1) That there be additional noise monitoring of the play structure during its use to ensure
that the decibel levels remain within the City's N oise Ordinance threshold
2) The start time for drop of students be at 8:OOam, teachers and staff can arrive earlier
3) The be a designated on-site person to assist and monitor the drop off/pick up activities
3 Administrative Hearing
Ju n e 8,2017
4) Continue to work with the City's Public Works' Staff regarding the study of the
feasibility and implementation of adding an additional driveway off of Stelling Road to
reducetrafficon ,bllyman Road
ADJOURNMENT
Respectfully submitted:
/s/Beth Ebben
Beth Ebben
AdministrativeAssistant
g:planning/AH Committee/Minutes0608U
OFFICE OF COMMUNITY DEVELOPMENT
PLANNING DIVISION
CITY HALL
10300 TORRE AVEN U E• CU PERTI N O,CA 950143255
C U P E RT I N O (408)777-3308• FAX(408)777-3333
ADMINISTRATIVE HEARING STAFF REPORT
Agenda Date: October 26, 2017
SUBJECT
Architectural and Slte Approval to consider the construction of a new 4,172 square feet
Bank of America branch building to replace an existing 5,265 square feet multi-tenant
commercial building, including associated site and street frontage improvements
includingapaved plazaareaatthenortheastcornerofthesiteand aTreeRemoval Permit
to allow for the removal of 14 protected trees; (Application No(s).: ASA-2017-05 and TR-
2017-39; Applicant(s): Whitney Marr (Gensler); Location: 21020 Homestead Road;
A PN(s): 326-07-020)
RECOMMENDED ACTION
That the Hearing Officer:
1. Find that the proposed actions are exempt from CEQA; and
2. Adopt the resolutions to approve the Architectural and S1te Approval and Tree
Removal permits in accordancewith the draft resolutions(Attachments 1 and 2).
DISCUSSION
Project Data:
General Plan Designation: Com m erci al
Special Area: Stelling Gateway in the Homestead S�ecial Area
Zoning Designation: P(CG) Planned Development (General Commercial)
Existing Proposed
Lot Size: 25,422 sq. ft. 24,163 sq. ft. (1,259 sq. ft.
dedicated to the City)
Floor Area and Use: 5,265 sq. ft. multi-tenant 4,172 sq. ft. bank branch
commercial building
ASA-2017-05 21020 Homestead Road (Bank of America) October 26,2017
TR-2017-39 Page 2
Setbacks Required Proposed
Front: Based on GPpoliciesand adequatefor light, 22'-6"
air and visibility. GP requires a 1:1 height to
setback ratio from curb on Homestead Rd.
Street Stide: Nonerequired 25'
Interior Slde: Nonerequired 50'
Rear: N on e req u i red 74'
Parking
Auto Parking: 17 spaces 33 spaces
Bi cy cl e Par k i n g: 4 sp aces 4 sp aces
Maximum Proposed
Height: 30' 22'
Project Consistency with
General Plan: Yes
Zoning: Yes
Environmental Categorically Exempt per Section 15302, Class2 (Replacement
Assessment: or Reconstruction) of California Quality Act (CEQA)
Background:
Slte Description
The project site is located within the Homestead Special Area in the Stelling Gateway on
the southwest corner of Homestead and N. Stelling Roads. The Stelling Gateway is
located close to city limits, with the City of �nnyvale located on the north side of
Homestead Road and theCity of Cupertinoon thesouth. Theland usessurrounding the
intersection are mainly commercial and retail uses in both jurisdictions with the closest
residences to the subject property more than 300 feet to the northeast. The Homestead
S�ecial Area,which extendsfrom N. , , - ,�:,�„� � ,� ..� _ ;
Blaney Ave. on the east to N oranda � � � ���'#�� T SITE VICINITY h�� � �
Dr. west of N. Stellin Rd. on the '- �' '�'I��''� � ��� �� - � l
� 9 ) k ` ' , . , �-,
west, is intended to continue as a � '����`►�"" ������ � � � "���
predominantly mixed-use area with :��_ �. ' i �����_'�" _ ° �� T ���.
residential uses and neighborhood � �^ _ " �;;�;r,: �
�: ����� �
centers providing services to local ��� �`^��' ;"' � �,�'' - �aa�, ,�„„
residents. � - a� �� , _ �,�,���,��.���
.j • . �
� - 4..`�_ ,� L , �,� �? � �I � •I
The property is bounded on the ° ; -
west and to thesouth by thelandsof - -- ' + _ �� ��' = � �,
r � ��� ��
.- � i `�' '� ,:,��
Valley Church of Santa Clara �u,, ,
� � �
i _...�''
County; to the north by a ' � -�� ;� �,�' �Y °'
ASA-2017-05 21020 Homestead Road (Bank of America) October 26, 2017
TR-2017-39 Page 3
commercial center located in the City of �nnyvale, with an Orchard Supply Hardware,
CVS Pharmacy, Taco Bell and several restaurant and retail tenants; to the northeast by a
SpeeDee Oil Change and Auto Service building; and to the east by a commercial center
with several restaurant tenants, a McDonald's restaurant, and a bowling alley
(Homestead Lanes). Most of the properties surrounding the subject site are developed
with singlestory buildings.
The site currently has a single-story multi-tenant commercial building constructed in
1980 with three tenants: a beauty salon, a massage therapy office, and a chiropractor
off i ce.
A�plication Requests
The applicant is seeking to construct a new Bank of America branch building to replace
the existing building on the site. The proposed use is a permitted use in this zoning
district, therefore no Conditional Use Permit is required. However, an Architectural and
StiteApproval permit isrequired in order toapprovethearchitectureand associated site
improvements, including re-pavement of the parking lot, re-landscaping at the site,
construction of a plaza at the northeast corner of the property, and a new trash enclosure
toservicethecenter.Theimprovementsincludetheremoval of 14existing protected trees
for which a Tree Removal permit is required. The application also includes a
comprehensive site-wide tree replacement plan in conjunction with the proposed new
building, landscaping, and off-site improvements.
While the Tree Removal Permit may be approved by the Director of Community
Development without a public meeting, the zoning code requires review by the highest
approval authority when applications are combined. Therefore, the permit must be
reviewed concurrently with the Architectural and Site Approval permit at an
Administrative H earing.
Slgnage is not approved as part of this proposal. Therefore, any future signs must be
approved through a sign permit or a Master Stign Program. Additionally, the property is
located in a zone where all fencing must be reviewed and approved by the City prior to
installation. Therefore, any existing unpermitted fencing will be required to be removed
and any new proposal for fenceswill need additional staff review.
Analysis:
The applicant team hasworked extensively with staff to address policies in General Plan:
Community Vision 2015-2040 such as site planning, building and parking location,
building layout, street interfaces, reduced driveway openings, shared and consolidated
driveway access, sidewalk and street frontage landscaping, pedestrian-oriented public
spaces, and publicart.
ASA-2017-05 21020 Homestead Road (Bank of America) October 26, 2017
TR-2017-39 Page 4
S1te Planning and Architectural Design
The proposal maintainsthe general building location and parking lot configuration as it
currently exists, with the building located at the northeast portion of the property, and
theparking located at therear of thebuilding. Theproposal locatesthebusinessentrance
close to the street to enhance the street interface and to provide a safe entry point for
pedestrians accessing the building from the public sidewalks. Pedestrian activity is
promoted at the site by maximizing window openings along both street frontages and
placing a plaza at thecorner of the parcel (further described below). Additionally, special
paving leading up to the bank from the parking lot also helps to improve pedestrian
experienceand accessfrom theprimary parking lot.
The building is proposed with smooth stucco finish throughout, aluminum metal
paneled canopy over select areas, and clear windowsspanning the northern and eastern
elevationswhereofficesand entrancesarelocated. Thesouthern and western portionsof
the building, wheretheback-of-officefacilitiesarelocated, facethe L-shaped parking lot.
Slncethesewallsare largely void of any fenestrations, latticesand vine landscaping have
been added at the city's consultant architect's recommendation.
The proposed automatic teller machines (ATM) are located within a card-protected 24-
hour vestibulelocated at thesoutheast portion of thebuilding and visiblefrom N. Stelling
Road. Thelightingfor areasaround ATMsarerequired by theCupertino Municipal Code
to be in conformance with the minimum standards required by the State of California
Businessand ProfessionsCodeand will befurther reviewed prior to issuanceof building
permits.
PI aza
TheCupertino General Plan setsgoalsto promote publicspacesthat enhancecommunity
identity and character (Policy LU-2.2:Pedestrian-Oriented Public Spaces)and developments
are required to incorporate pedestrian-scaled elements along the street to meet such
goals. Whilethearchitectural consultant recommended that theemployeearea located at
the southwest corner of the building include additional design elements for more
usability and higher visual quality and serve as a gathering spot, no changes have been
made in this area due to the bank's need to maintain the area clear of any visual
obstructions or barriers to address security concerns. The provision of the plaza at the
northeast corner as the public side/face of the site is an acceptable alternative. The
proposed plazaservesasan enhanced publicamenity and isdesigned with ground-level
decorative pavers and concrete seat-walls with precast stone veneers, but has limited
landscaping.
Thearchitectural consultant recommendsadding tall shadetreesat thecorner similar to
those on the S�eeDee site in the City of SLnnyvale and adding a public art piece. No
ASA-2017-05 21020 Homestead Road (Bank of America) October 26, 2017
TR-2017-39 Page 5
public art piece has been proposed by Bank of America since it appears that previous
issueswith controversial art hasled to a corporate policy that limitsthe ability to include
art piecessuch as, muralsor sculptures.Additionally, no changesweremadeto the plans
to add shade trees at the plaza. A condition of approval has been added to require the
planting of a medium-sized shadetreeto thesatisfaction of theCity in consultation with
the City's consulting arborist and the integration of small landscape areas closest to the
right of way and/or planter potswithin the plaza area.
Landscapinq & Trees
As part of the on-site improvements, the proposal includes removal of 14 existing
development (protected)treesthatweredetermined to beunsuitablefor retention dueto
decline in health, poor horticultural care and maintenance practices, conflict with
proposed street improvements, and species incompatibility with newly proposed storm
water infiltration areas. In order to mitigate the removal of the trees, the applicant team
proposes to plant five Red Maples (Acer rubrum), two Zelkovas (Zelkova serrulata), and
nine Crape Myrtles(Lagerstroemia spp.).
The replacement trees are dispersed throughout the site: within the newly proposed
water infiltration areas adjacent to parking, along thefront and street sidesetbacks along
the street frontages and in the plaza area as conceptualized in the landscape plan
(Attachment 3). While the tree replacements will increase the limited existing canopy
coverage, the proposed species will need to be evaluated as sufficient shade trees in
conformance with General Plan policies (Strategies E�2.1.5: Urban Forest and E�5.1.2:
Built Environment). Theconditionsof approval regarding landscaping includeprovisions
to ensure that the final landscape plan indicate additional ground cover in the area
adjacent to the intersection where paving is proposed and that the final species of
replacement trees be reviewed and approved by the City in consultation with the City's
Consulting Arborist prior to issuanceof building permits.
Parking and Circulation
The development provides 33 parking spaces (16 auto parking spaces more than
required) and 4 bicycle parking spaces in compliancewith the City's Parking Ordinance.
As mentioned previously, the parking is located at the rear of the building to ensurethat
driveway approaches are spaced appropriately away from the intersection as well as to
promoteactivestreetfrontages. Furthermore, thebicycleparking isconveniently located
at theentranceof thebank building facing and adjacent to North Stelling Road, wherea
Class IV separated bike lane is envisioned in the Cupertino BicycleTransportation Plan.
There are two driveways located within 50 feet of each other on Homestead Rd, one
serving the subject site and one serving the adjacent property (Valley Church). The
Cupertino General Plan sets a goal of improving walkability and bikeability and, to that
ASA-2017-05 21020 Homestead Road (Bank of America) October 26,2017
TR-2017-39 Page 6
end, identifies policies to further this goal. One of the � �---�y �
policies, Policy M-3.5: Curb Cuts states " Minimize the �`"
�
number and the width of driveway openings" and also � � ; , 5� � � ,;���,'.,�
encouragestheshared useof drivewayswherefeasibleand � ��� _ � � �
�,_y
authorizesdriveway closures, consolidationsor both when �� `�ti y ;� �
asiteisredeveloped or remodeled (Strategy M-3.5.1: Shared ,� � �{ ._� _-
Driveway Access).The proposal was reviewed for � :� � �� ������ � �
conformance with these policies and strategies and it was � �
determined that thetwo driveways should beconsolidated !� �
to improvesafety and walkability. �" �
SHARED DRIVEWAY CONCEPT
The applicant is agreeable to working with the property �� �� ` " ��
owners of Valley Church to reduce the number of driveway cuts along Homestead by
consolidating theexisting driveways(indicated in red in Shared Driveway Concept) and
utilizing shared driveway access. Discussions were initiated for pursuing the driveway
consolidation and during preliminary discussions, it was determined that the shared
driveway would liewhere currently thereisa PG&E electricjunction box, and fiber optic
linesand meters. Duetotheanticipated timethatwould berequired toengagewith and
receiveapprovalswith theappropriateutility providers, itwasagreed that consolidation
for the driveway on Homestead Road could be deferred to a later time and would not
need to beincluded in thisscopeofwork.
However, it was agreed that in the interim, the applicant would reducethewidth of the
driveway off of Homestead Road to 24 feet for a safer pedestrian and bicycle street
interface. This has been indicated on the proposed plans. A condition of approval has
been added that if the applicant is unable to obtain a building permit to implement the
shared driveway prior to final occupancy, a covenant shall be recorded instead, to
memorialize the agreement to consolidate the western driveway and to record
appropriate ingress/egress easements for access, at a time when the City can require the
same of the adjacent property.
Street Improvements
Off-site improvements consisting of sidewalk, curb, and driveway (discussed above)
work will be required with thisproject. Currently, a monolithicsidewalk islocated along
the property's street frontages but as part of off-site improvements it will be replaced
with adetached sidewalk tothesatisfaction of theDirector of PublicWorks. Furthermore,
the pedestrian curb ramp at the intersection of Homestead and N. Stelling Roadswill be
reconfigured and a traffic signal pole will be relocated. In addition, a dedication of land
of up to 10 feet in width along the project frontage, to the satisfaction of the Director of
PublicWorks, isrequired.
ASA-2017-05 21020 Homestead Road (Bank of America) October 26, 2017
TR-2017-39 Page 7
Environmental Review
This project is categorically exempt from the requirements of the California
Environmental Quality Act (CEQA) per Section 15302— Replacement or Reconstruction
becausetheexemption appliestothereplacement or reconstruction of existing structures
and facilitieswherethenew commercial structurewill belocated on thesamesiteasthe
structure replaced and will havesubstantially thesamesize, purpose, and capacity asthe
structure replaced.
Other Department/Agency Review
The City's Public Works Department; Building Division; Environmental Programs
Division; the Santa Clara County Fire Department; Cupertino Sanitary District; and
Recology reviewed the request and have no objections to the project. Their pre-hearing
commentshavebeen incorporated asconditionsof approval in thedraft resolutions.
PUBLIC NOTICING AND COMMUNITY OUTREACH
Thefollowing table is a brief summary of the noticing for this project:
Noticeof PublicHearing Agenda
■ S1te Slgnage (at least 14 days prior to ■ Posted on theCity'sofficial notice
hearing) bu I I eti n board �five days prior to
■ 8 notices mailed to property owners hearing)
adjacent to the project site(at least 10 days ■ Posted on the City of Cupertino's
prior to the hearin ) Web site ive da s prior to hearin )
As of October 19, 2017, staff has received comments from four people. Written public
commentsareincluded asAttachment4.
Two people stated that they were opposed to the proposed development as they were
patronsof Happy Cutswhich they wished to remain at thesite.
A member of the public shared their confusion on the necessity of another bank branch
particularly when replacing an existing fully-tenanted commercial building that provides
the community with personal servicesand felt a bank branch would be better located in
an areathat can beeasily accessed by foot likeashopping mall. Furthermore, they shared
concernswith regard tothetreeremoval and proposed landscaping plans.
Another member of the public verbally expressed concerns about the traffic impact of
additional construction on Homestead Road stating that it is very inconvenient for the
community and that left turnsout of thedevelopment aredangerous.
ASA-2017-05 21020 Homestead Road (Bank of America) October 26, 2017
TR-2017-39 Page 8
PERMIT STREAMLINING ACT
This project is subject to the Permit Streamlining Act (Government Code Section 65920—
65964). TheCity hascomplied with thedeadlinesfound in the Permit Streamlining Act.
Project Received: M ay 26, 2017; Deemed Incomplete: Ju ne 26, 2017
Revisions Received: August 31, 2017; Deemed Incomplete: September 28, 2017
Revisions Received: October 11, 2017; Deemed Complete: October 11, 2017
Slnce this project is Categorically Exempt, the City has 60 days (until December 11, 2017)
to make a decision on the project.
CONCLUSION
Staff recommends approval of the Architectural and Slte Approval and Tree Removal
Permits, since the plans and conditions of approval address all concerns related to the
proposed project. Additionally, all of the findingsfor approval of the proposed project,
consistent with Chapters 14.18and 19.168of theCupertino M unicipal Code, may be made
asreflected in theDraft Resolutions.
NEXT STEPS
The permit will be effective 14 calendar days from the date of the hearing. The decision
of the Administrative Hearing Officer is final, unless appealed within 14 calendar days
from the date of the hearing. The applicant team may apply for building and/or other
permitswith theCity at theend of theappeal period.
This approval is valid until October 26, 2019. The applicant team may apply for a one-
timeoneyear extension beforetheapproval expires.
Prepared by: Ellen Yau, Assistant Planner
Approved by: Piu Ghosh, Principal Planner
ATTACHMENTS
1. Draft Resolution for ASA-2017-05
2. Draft Resolution for TR-2017-39
3. PI an Set
4. Written PublicComments
CITY OF CUPERTINO
10300 TorreAvenue
Cupertino, California 95014
DRAFT RESOLUTION
OFTHEADMINISTRATIVEHEARING MEETING OFTHECITYOFCUPERTINOTO
CONSIDERTHECONSTRUCTION OFA NEW 4,172SQUAREFEET BANK OF
AMERICABRANCH BUILDINGTOREPLACEAN EXISTINGSINGLE-STORY5,265
9QUAREFEETMULTI-TENANTCOMMERCIAL BUILDING, INCLUDING
ASSOCIATED SITEAND STREET FRONTAGE IMPROVEMENTSINCLUDINGA
PAVED PLAZA AREA AT TH E N ORTH EAST CORN ER OF TH E SITE AT 21020
HOMESTEAD ROAD.
SECTION I: PRO.�CT DESCRIPTION
Application No.: ASA-2017-05
Applicant: Whitney Marr (Gensler)
Location: 21020 Homestead Road (APN #326-07-020)
SECTION II: FINDINGS
WHEREAS, the Administrative Hearing Meeting of the City of Cupertino received an
application for a new 4,172 square feet Bank of America branch building to replace an
existing single-story 5,265 square feet multi-tenant commercial building, including
associated site and street improvements, including a paved plaza area at the northeast
corner of the site; and
WHEREAS, the project is categorically exempt from the California Environmental
Quality Act (CEQA);
WH EREAS, the necessary public notices have been given as required by the Procedural
Ordinance of the City of Cupertino, and theAdministrative Hearing Officer has held at
least one public meeting in regard to theapplication;
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, theAdministrativeHearing Officerfinds:
Draft Resolution ASA-2017-05 October 26,2017
Page 2
1. The proposal, at the proposed location, will not be detrimental or injurious to
property or improvements in the vicinity, and will not be detrimental to the public
health, safety, general welfare, or convenience;
The proposal maintains the general building location and parking lot configuration as it
currently exists, with the building located at the northeast portion of the property, and the
parking located at the rear of the building. The project proposal will not be detrimental or
injurious to property or improvements in the vicinity, and will not be detrimental to the
public health, safety, general welfare, or convenience. The project would be required to detach
the existing monolithic sidewalk along the property's street frontage. This would improve the
pedestrian experience and safety. The proposal also includes mitigations to reduce the width
of existing two-way driveway curb cuts which would further enhance the site and ameliorate
impacts to pedestrians and bicyclists.
2. The proposal is consistent with the purposes of Chapter 19.168, Architectural and
Slte Review, of the Cupertino Municipal Code, the General Plan, any specific plan,
zoning ordinances, applicable planned development permit, conditional use
permits, variances, subdivision mapsor other entitlementsto usewhich regulatethe
subject property including, but not limited to, adherence to the following specific
cri teri a:
a) Abrupt changes in building scale should be avoided. A gradual transition related to
height and bulk should beachieved between new and existing buildings;
Most of the properties surrounding the subject site are developed with single story buildings
and the proposed building maintains the single-story scale and increases to the height of the
building are primarily to incorporate parapets in order to screen anticipated rooftop
equipment. Additionally, the mass of the building is accentuated with a combination of wall
articulation, decorative cornices, metal awnings, and significant window fenestration.
Furthermore, the proposed changes to the height of the structure are within the regulations
established in the General Plan: Community Vision 2015-2040.
b) In order to preserve design harmony between new and existing buildings and in
order to preserve and enhance property values, the materials, textures and colors of
new buildings should harmonize with adjacent development by being consistent or
compatible with design and color schemes, and, with the future character of the
neighborhood and purposes of the zone in which they are situated. The location,
height and materials of walls, fencing, hedges and screen planting should harmonize
with adjacent development. Unsightly storage areas, utility installations and
unsightly elementsof parking lotsshould beconcealed. The planting of ground cover
or various types of pavements should be used to prevent dust and erosion, and the
Draft Resolution ASA-2017-05 October 26,2017
Page 3
unnecessary destruction of existing healthy trees should be avoided. Lighting for
development should be adequate to meet safety requirements as specified by the
engineering and building departments, and provide shielding to prevent spill-over
light to adjoining property owners;
The newly proposed architectural design, materials,finishes, and textures will be consistently
applied to the entire building fa�ade to allow for four-sided complete architectural integrity
and will be compatible with the character of the neighborhood as a mix of commercial and
residential-scaled design. The proposal includes no changes to the location, height, and
materials of walls and fencing. Any unpermitted fencing will be removed as part of this
development. Landscaping is being proposed to soften the edges of the development, to enhance
on-site amenities, provide relief on building walls, and are intended to harmonize with
adjacent property through the installation of adequate amounts of groundcover and shade
trees throughout. Furthermore, the proposal includes the construction of a trash enclosure at
the rear of the parking lot which will conform to the City's requirements to screen and shelter
waste collection bins.
c) The number, location, color, size, height, lighting and landscaping of outdoor
advertising signs and structures shall minimize traffic hazards and shall positively
affect the general appearance of the neighborhood and harmonize with adjacent
development; and
No signage is approved as part of this proposal.
d) With respect to new projects within existing residential neighborhoods, new
development should be designed to protect residents from noise, traffic, light and
visually intrusive effects by use of buffering, setbacks, landscaping, walls and other
appropriate design measures
The proposal is a new development that maintains the general scale, building location, and
parking lot configuration as it currently exists. This development is not within an existing
residential neighborhood. Therefore, this finding does not apply. However, the proposed
landscaping and tree plantings around the parking lot, street frontages, and in the public
plaza will provide visual buffering of the buildings and will enhance the tree canopy coverage
on-site, and protect the closest residents, that are located 300 feet northeast of the subject site,
from visually intrusive effects.
N OW, TH EREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence
submitted in this matter, theApplication No. ASA-2017-05, is hereby approved; and
Draft Resolution ASA-2017-05 October 26,2017
Page 4
That the subconclusions upon which the findings and conditions specified in this
Resolution are based and contained in the public hearing record concerning Application
No. ASA-2017-05 as set forth in the Minutes of the Administrative Hearing Meeting of
October 26, 2017, and are incorporated by reference herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPM EN T DEPARTM EN T
1. A PPROV ED EXH I BI TS
Approval is based on the plan set titled "Bank of America Homestead Road New
Store" dated 10/18/17 drawn by Gensler consisting of eleven (11) sheets labeled
"A 00.50, A 00.51, A 00.52, A 00.53, A 09.11, A 09.15, L.01, L.02, E-0.0, Sh eet 1 of 1, an d
C.1, except as may beamended by conditions in this resolution.
2. CONCURRENTAPPROVAL CONDITIONS
The conditions of approval contained in file no. TR-2017-39 shall be applicable to
this approval.
3. ANNOTATION OFTHECONDITIONSOFAPPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the
building plans.
4. ACCU RACY OF PRO.�CT PLA N S
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks,
property size, building square footage, any relevant easements and/or construction
records. Any misrepresentation of any property data may invalidate this approval
and may requireadditional review.
5. DEMOLITION REQUIREMENTS
All demolished building and site materials shall be recycled to the maximum extent
feasible, in accordance with the City's Recycling and Diversion of Construction and
Demolition Waste under Chapter 16.72 of the Cupertino Municipal Code. The
applicant shall provide evidence that materials were recycled prior to issuance of
final demolition permits.
6. LIGHTING
On-site lighting must be in conformance with Cupertino Municipal Code Chapter
19.60 and automatic teller machine lighting, specifically, shall meet minimum
standards required by the State of California Business and Professions Code.
Draft Resolution ASA-2017-05 October 26,2017
Page 5
7. GREEN SCREEN S
The applicant will be required to install and maintain the green screens along the
western and southern walls as indicated on pages A09.11, L0.1 and L0.2 of the
approved exhibits.
8. FENCING
The applicant will be required to remove all unpermitted fencing to the satisfaction
of the Director of Community Development prior to issuanceof building permits.
9. A RBO RI ST REV I EW
Prior to building permit issuance, an arborist review will be required as listed in the
conditionsof approval contained in fileno. TR-2017-39.
10. LANDSCAPEDOCUMENTATION PACKAGE
Prior to issuance of building permits, the applicant shall submit a full Landscape
Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape
Ordinance. The Landscape Documentation Package shall be reviewed and approved
to the satisfaction of the Director of Community Development prior to issuance of
building permits, and additional requirements per sections 14.15.050 E, F, G, H, and
I will be required to be reviewed and approved prior to final inspections.
11. LANDSCAPEAND IRRIGATION PLANS
The applicant shall submit detailed landscape and irrigation plans to be reviewed
and approved by the Directors of Community Development and Public Works or
his/her designee prior to issuance of building permits. The landscape plan shall
include water conservation and pesticide reduction measures in conformance with
Chapter 14.15, Landscape Ordinance, and the pesticide control measures referenced
in Chapter 9.18, Stormwater Pollution Prevention and Watershed Protection, of the
Cupertino Municipal Codeand shall also beamended to ensurethat:
a. Additional landscaping in the area closest to the right of way is incorporated
through ground-level landscaping and/or in appropriately sized planter pots
within the plaza area. The landscape planter box, fencing, landscaping, irrigation
and/or plaza area design shall be reviewed and approved by the Director of
Community Development prior to issuanceof building permits; and
b. A medium sized shade tree is planted at the plaza area subject to review and
approval by the City in consultation with the City's Consulting Arborist; and
c. The final list of replacement trees is approved by the City in consultation with
the city's consulting arborist to reduce the number of crape myrtle trees
proposed as replacement trees.
Draft Resolution ASA-2017-05 October 26,2017
Page 6
12. LANDSCAPEAND IRRIGATION MAINTENANCE
Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall
be established and submitted to the Director of Community Development or his/her
designee, either with the landscape application package, with the landscape
installation report, or any time before the landscape installation report is submitted.
a) Schedules should take into account water requirements for the plant
establishment period and water requirementsfor established landscapes.
b) Maintenance shall include, but not be limited to the following: routine
inspection; pressure testing, adjustment and repair of the irrigation system; aerating
and de-thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of
failed plants; weeding; pest control; and removing obstructionsto emission devices.
c) Failed plants shall be replaced with the same or functionally equivalent plants
that may be size-adjusted as appropriate for the stage of growth of the overall
installation. Failing plantsshall either be replaced or be revived through appropriate
adjustments in water, nutrients, pest control or other factors as recommended by a
landscaping professional.
13. LANDSCAPEAND IRRIGATION INSTALLATION REPORT
Theproject issubject to all provisionsdelineated in the LandscapeOrdinance(CMC,
Chapter 14.15). A landscape installation audit shall be conducted by a certified
landscape professional after the landscaping and irrigation system have been
installed. The findings of the assessment shall be consolidated into a landscape
installation report.
The landscape installation report shall include, but is not limited to: inspection to
confirm that the landscaping and irrigation system are installed as specified in the
landscape and irrigation design plan, system tune-up, system test with distribution
uniformity, reporting overspray or run-off that causes overland flow, and
preparation of an irrigation schedule.
The landscape installation report shall include the following statement: "The
landscape and irrigation system have been installed as specified in the landscape
and irrigation design plan and complies with the criteria of the ordinance and the
permit."
14. DRIVEWAYCONSOLIDATION AND INGRESSiEGRESSEASEMENT
Should the applicant not obtain appropriate building permits and record
appropriate easements for consolidation of the west driveway off of Homestead
Road prior to issuance of building permits for the bank building, prior to final
Draft Resolution ASA-2017-05 October 26,2017
Page 7
occupancy, the applicant shall record a covenant (or whichever legal document
deemed appropriate by the City) agreeing to consolidatethe existing driveway off of
Homestead Road and record an appropriate Reciprocal Access Easement over
portions of the property for shared driveway access. The nonexclusive easement
shall provide vehicular and pedestrian ingress and egress over the area for shared
driveway access. The easement language shall provide that construction of the
driveway shall be completed/connected to the City's satisfaction at such time as the
city can require the adjacent property owner to agree to consolidate the driveway
and provide a reciprocal ingress/egress easement through a planning permit. The
agreement language including the driveway and easement layout shall be reviewed
and approved by the City prior to recordation with the County Recorder's Office.
The easement shall contain a provision that it may not be modified or removed
without expresswritten approval from theCity.
15. SCREEN I N G
All mechanical and other equipment on the building or on the site shall be screened
so they are not visiblefrom public street areasor adjoining developments. Screening
materials/colors shall match building features and materials. The height of the
screening shall be taller than the height of the mechanical equipment that it is
designed to screen. The location of equipment and necessary screening shall be
reviewed and approved
16. UTILITY STRUCTURE PLAN
Prior to issuanceof building permits, theapplicant shall work with staff to providea
detailed utility plan to demonstrate screening or undergrounding of all utility
structures [including, but not limited to backflow preventers (BFP), fire department
connections (FDC), post-indicator valves (PIV), and gas meters] to the satisfaction of
the Director of Community Development, Public Works, Fire Department, and
applicable utility agencies.
17. WINDOW DETAILS
The frontage windows shall be kept open and transparent to the greatest extent
possible. The final storefront design and window display shall be reviewed and
approved by the Director of Community Development prior to issuanceof building
permits for tenant improvements. No changes shall be made to the transparency of
the windows without the express approval of the Director of Community
Development.
18. EXTERIORBUILDING MATERIALS�TREATMENTS
The final building exterior plan shall closely resemble the details shown on the
Draft Resolution ASA-2017-05 October 26,2017
Page 8
original approved plans. Final building exterior treatment plan (including but not
limited to details on exterior color, materials, architectural treatments, doors,
windows, lighting fixtures, and/or embellishments) shall be reviewed and approved
by the Director of Community Development prior to issuance of building permits to
ensure quality and consistency. Any exterior changes determined to be substantial
by the Director of Community Development shall either require a modification to
this permit or a new permit based on the extent of the change.
19. CONSULTATION WITH OTHERDEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
20. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant to
Government Code Section 66020(d) (1), these Conditions constitute written notice of
a statement of the amount of such fees, and a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90-day
approval period in which you may protest thesefees, dedications, reservations, and
other exactions, pursuant to Government Code Section 66020(a), has begun. If you
fail to file a protest within this 90-day period complying with all of the requirements
of Section 66020, you will be legally barred from later challenging such exactions.
SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS
D EPA RTM EN T
21. TRA FFI C I M PA CT FEES
The Project may be subject to pay Traffic Impact Fees. Thefee is currently estimated
to beset at $7,000 per new AM or PM peak-hour trip generated by the Project subject
to be approved by the City Council in August 2017.
22. STREET IMPROVEMENTS& DEDICATION
Provide a dedication and frontage improvements along the project frontage to the
satisfaction of the Director of Public Works. Street improvements may include, but
not be limited to, new detached sidewalk, new ADA ramp, driveways, storm drain
lateral, street tree installations, and street light and/or pedestrian push button
relocation.
Draft Resolution ASA-2017-05 October 26,2017
Page 9
23. PED ESTRI A N A N D BI CYCL E I M PROV EM EN TS
Developer shall provide pedestrian and bicycle related improvements(e.g. walkway
and bicycle racks, etc.) consistent with the Cupertino Bicycle Transportation Plan
and the Pedestrian Transportation Guidelines, and as approved by the Director of
Public Works.
24. STREET LIGHTING INSTALLATION
Street lighting shall be installed and shall be as approved by the Director of Public
Works. Lighting fixtures shall be positioned so as to preclude glare and other forms
of visual interference to adjoining properties, and shall be no higher than the
maximum height permitted by thezone in which thesite is located.
25. GRADING AND DRAINAGE
Grading shall be as approved and required by the Director of Public Works in
accordancewith Chapter 16.08of theCupertino Municipal Code.
All storm drain inletsshall beclearly marked with thewords" No Dumping — Flows
to Creek" using permanently affixed metal medallions or equivalent, as approved
by the Environmental Programs Division.
26. C.3 REQU I REM EN TS
C.3 regulated improvements are required for all projects creating and/or replacing
10,000 S.F. or more of impervious surface (collectively over the entire project site).
The developer shall reserve a minimum of 4% of developable surface area for the
placement of low impact development measures, for storm water treatment, unless
an alternative storm water treatment plan, that satisfies C.3 requirements, is
approved by the Director of Public Works.
The developer must include the use and maintenance of site design, source control
and storm water treatment Best Management Practices (BMPs), which must be
designed per approved numeric sizing criteria. A Storm Water Management Plan,
Storm Water Facilities Easement Agreement, Storm Water Facilities Operation and
MaintenanceAgreement, and certification of ongoing operation and maintenanceof
treatment BMPsareeach required.
All storm water management plans are required to obtain certification from a City
approved third party reviewer.
Draft Resolution ASA-2017-05 October 26,2017
Page 10
27. I M PROV EM EN T A GREEM EN T
The project developer shall enter into a development agreement with the City of
Cupertino providing for payment of fees, including but not limited to checking and
inspection fees, storm drain fees, park dedication fees and fees for under grounding
of utilities. Said agreement shall be executed prior to issuance of construction
permits.
Fees:
a. Checking & Inspection Fees: $ Per current fee schedule ($6,266.00 or
5% of improvement costs)
b. Grading Permit: $ Per current fee schedule ($2,825.00 or
6% of improvement costs)
c. Development Maintenance $ 1,000.00
Deposit: $ Per current fee schedule ($8,790.00 per
d. Storm Drainage Fee: AC)
e. Traffic Impact Fee: $7,000 per new AM or PM peak-hour
f. Power Cost: trip
g. Storm Management Plan **
Fee: Per current feeschedule($1,208)
h. Street Tree: By Developer
** Based on the latest effective PG&E rate schedule approved by the PUC
Bonds:
- Faithful Performance Bond: 100% of Off-site and On-site Improvements
- Labor & Material Bond: 100%of Off-siteand On-site Improvement
- On-site Grading Bond: 100% of site improvements.
The fees described above are imposed based upon the current fee schedule adopted
by the City Council. However, the fees imposed herein may be modified at the time
of recordation of a final map or issuance of a building permit in the event of said
change or changes, the fees changed at that time will reflect the then current fee
sch ed u I e.
28. TRASH, RECYCLYI N G A N D COM POST EN CLOSU RES
Trash enclosure plans must be designed in accordance with the City's Public Works
Guidelines posted at www.cupertino.org/nowaste, and to the satisfaction of the
Environmental Programs Manager. Clearance by the Public Works Department is
required prior to obtaining a building permit (CMC 9.18.210 (H) & (K)).
Draft Resolution ASA-2017-05 October 26,2017
Page 11
29. OPERATIONS& MAINTENANCEAGREEMENT
Developer shall enter into an Operations & Maintenance Agreement with the City
prior to final occupancy. The Agreement shall include the operation and
maintenance for non-standard appurtenances in the public road right-of-way that
may include, but is not limited to, sidewalk, pavers, and street lights.
30. UNDERGROUND UTILITIES
Developer shall comply with the requirements of the Underground Utilities
Ordinance No. 331 and other related Ordinances and regulations of the City of
Cupertino, and shall coordinate with affected utility providers for installation of
underground utility devices. Developer shall submit detailed plans showing utility
underground provisions. Said plans shall be subject to prior approval of the
affected Utility provider and theDirector of PublicWorks.
31. TRA N SFORM ERS
New electrical transformers, telephone cabinets and similar equipment shall be
placed in underground vaults. The developer must receive written approval from
both the Public Works Department and the Community Development Department
prior to installation of any above ground equipment. Should above ground
equipment be permitted by the City, equipment and enclosures shall be screened
with fencing and landscaping such that said equipment is not visible from public
street areas, as determined by the Community Development Department.
Transformersshall not belocated in thefront or sidebuilding setback area.
32. WATER BACKFLOW PREVENTERS
Domestic and Fire Water Backflow preventers and similar above ground equipment
shall be placed away from the public right of way and site driveways to a location
approved by the Cupertino Planning Department, Santa Clara County Fire
Department and thewater company.
33. BEST MANAGEM ENT PRACTICES
Utilize Best M anagement Practices (BM Ps), as required by the State Water Resources
Control Board, for construction activity, which disturbs soil. BMP plans shall be
included in grading and street improvement plans.
34. EROSION CONTROL PLAN
Developer must provide an approved erosion control plan by a Registered Civil
Engineer. This plan should include all erosion control measures used to retain
materialson site. Erosion control notesshall bestated on theplans.
Draft Resolution ASA-2017-05 October 26,2017
Page 12
35. WORK SCHEDULE
Every 6 months, the developer shall submit a work schedule to the City to show the
timetablefor all grading/erosion control work in conjunction with this project.
36. TRA FFI C CON TROL PLA N
The developer must submit a traffic control plan by a Registered Traffic Engineer to
be approved by the City. The plan shall include a temporary traffic control plan for
work in the right of way as well as a routing plan for all vehicles used during
construction. All traffic control signs must be reviewed and approved by the City
prior to commencement of work. The City has adopted Manual on Uniform Traffic
Control Devices (M UTCD) standards for all signage and striping work throughout
the City.
37. STREET TREES
Street trees shall be planted within the Public Right of Way to the satisfaction of the
Director of Public Works and shall be of a type approved by the City in accordance
with OrdinanceNo. 125.
38. FI RE PROTECTI ON
Firesprinklersshall beinstalled in any new construction totheapproval of theCity.
39. SANTA CLARA COUNTY FIRE DEPARTMENT
A letter of clearance for the project shall be obtained from the Santa Clara County
Fire Department prior to issuance of building permits. Clearance should include
written approval of the location of any proposed Fire Backflow Preventers, Fire
Department Connections and Fire Hydrants (typically Backflow Preventers should
be located on private property adjacent to the public right of way, and fire
department connections must be located within 100' of a Fire Hydrant).
40. FIRE HYDRANT
Fire hydrants shall be located as required by the City and Santa Clara County Fire
Department as needed.
41. CALIFORNIA WATERSERVICECOMPANYCLEARANCE
Provide California Water Service Company approval for water connection, service
capability and location and layout of water lines and backflow preventers before
issuanceof a building permit approval.
Draft Resolution ASA-2017-05 October 26,2017
Page 13
42. DEDICATION OFUNDERGROUND WATERRIGHTS
Developer shall "quit claim" to the City all rights to pump, take or otherwise extract
water from the underground basin or any underground strata in the Santa Clara
Valley.
43. SAN ITARY DISTRICT
A letter of clearance for the project shall be obtained from the Cupertino Sanitary
District prior to issuanceof building permits.
44. UTILITY EASEMENTS
Clearance approvals from the agencies with easements on the property (including
PG&E, AT&T, and California Water Company, and/or equivalent agencies) will be
required prior to issuanceof building permits.
45. WASTE TRIO AN D CIGARETTE BUTT URN
Waste trio and cigarette butt urn manufacturer specifications must be provided to
the Environmental Programs Division for review. Location of waste trio must be
located entirely on private property and in proximity to pedestrian use of the
sidewalk. Clearance by the Public Works Department is required prior to obtaining
a building permit.
46. STORM DRAINS
All exterior storm drain inlets on the parcel must be fitted with full trash capture
storm drain catch basin inlet devices to prevent litter from entering the storm drain
system. Devices installed must be approved by the California State Water Board and
selected from the San Francisco Bay Regional Water Quality Control Board list,
which can be viewed at http://www.sfestuary.ora/a�proved-trash-capture-devices.
Please includewith the resubmittal, the manufacturer specification sheet for all trash
capture device(s) included with the project. As a condition of approval, the devices
must be installed and maintained (cleaned) in accordance with the manufacturer
specifications, but not less than two times per year. The property owner must
provide official written record of cleaning and maintenance to the City upon
req u est.
47. STORM DRAIN INLET MARKERS
All exterior storm drain inlets on the property shall be clearly marked with "No
Dumping Flowsto Creek" or "No Dumping Flowsto Bay" markers.
Draft Resolution ASA-2017-05 October 26,2017
Page 14
48. COPPER U SES PROH I BI TED
Copper metal roofing, copper granule containing asphalt shingles, copper gutters
and downspouts, and/or other exterior ornamental copper are not permitted for use
on any commercial or industrial building.
49. C&D WASTE MANAGEM ENT PLAN
A completed C&D Waste Management Plan must be submitted at the time of
building permit issuance. If the applicant and/or their contractor and any
subcontractor working on the project self-hauls the C&D material, a Waste
Management Report must be submitted prior to final approval of the building
permit demonstrating a minimum of 65% of the C&D waste has been diverted from
landfill and recycled. Please note that C&D debris box service may only be obtained
from Recology, the City'sfranchised waste hauler. C&D Recycling information and
reportsmay beviewed atwww.cupertino.org/qreendev.
50. RECOLOGY REVIEW
The location, path of travel, and associated design features of the on-site trash
enclosure will be required to be reviewed by Recology, the City's franchised waste
hauler, and approved by the Public Works Department prior to building permit
i ssu an ce.
SECTION V: CONDITIONSADMINISTERED BYTHEBUILDING DEPT.
51. ACCESSIBLE PATH OF TRAVEL
The applicant shall provide accessible path-of-travel from the building to the trash
enclosure per 2016 California Building Code.
SECTION VI: CONDITIONS ADMINISTERED BY SANTA CLARA COUNTY FIRE
D EPT.
52. FI RE SPRI N K L ERS
Certain structures may require fire sprinkler coverage under exterior roof
overhangs. SL�ch areas must be reviewed by a properly licensed contractor. If thefire
sprinkler system is to be modified, a State of California licensed (C-16) Fire
Protection Contractor shall submit plans, calculations, a completed permit
application and appropriate fees to the Santa Clara County Fire Department for
review and approval prior to beginning their work.
53. CON STRU CTI ON SI TE FI RE SA FETY
All construction sites must comply with applicable provisions of our Standard
Detail and S�ecification SI-7 and Chapter 33 of the currently adopted edition of the
Draft Resolution ASA-2017-05 October 26,2017
Page 15
California Fire Code. This must be submitted to and approved by this office prior to
commencing any demolition/construction activities.
54. PU BL I C FI RE H YD RA N T(S� REQU I RED
Identify the location of the existing public fire hydrant(s). Maximum hydrant
spacing shall be 500 feet, with a minimum single hydrant flow of 1,750 GPM at 20
psi, residual. Fire hydrants shall be provided along required fire apparatus access
roads and adjacent public streets within 100' of the fire department connection
(FDC).
55. WATER SU PPLY REQU I REM EN TS
Potable water supplies shall be protected from contamination caused by fire
protection water supplies. It is the responsibility of the applicant and any
contractors and subcontractors to contact the water purveyor supplying the site of
such project, and to comply with the requirements of that purveyor. SUch
requirements shall be incorporated into the design of any water-based fire
protection systems, and/or fire suppression water supply systems or storage
containers that may be physically connected in any manner to an appliance capable
of causing contamination of the potable water supply of the purveyor of record.
Final approval of the system(s) under consideration will not be granted by this office
until compliance with the requirements of the water purveyor of record are
documented by that purveyor as having been met by the applicant(s).
56. ADDRESSIDENTIFICATION
New and existing buildings shall have approved address numbers, building
numbers or approved building identification placed in a position that is plainly
legible and visiblefrom the street or road fronting the property. These numbers shall
contrast with their background. Address numbers shall be Arabic numbers or
alphabetical letters. N umbers shall be a minimum of 4 inches(101.6 mm) high with a
minimum strokewidth of 0.5 inch (12.7 mm).
Draft Resolution ASA-2017-05 October 26,2017
Page 16
PASSED AN D ADOPTED this 26th day of October, 2017 at a noticed Public Meeting of
theAdministrative Hearing Officer of the City of Cupertino, State of California, held by
the Director of Community Development, or his or her designee, pursuant to Cupertino
M unicipal Code Section 19.12.120.
ATTEST: A PPROV ED:
EI I en Yau Ben j am i n Fu
Assistant Planner Asst. Director of Community Development
CITY OF CUPERTINO
10300 TorreAvenue
Cupertino, California 95014
DRAFT RESOLUTION
OFTHEADMINISTRATIVEHEARING MEETINGOFTHECITYOFCUPERTINO
TO ALLOW TH E REM OVAL AN D REPLACEM ENT OF 14 PROTECTED TREES
TO FACI LITATE TH E CON STRUCTI ON OF A N EW COM M ERCIAL BAN K
BRANCH AND ASSOCIATED SIDEWALK IMPROVEMENTS
A T 21020 H O M ESTEA D ROA D (A PN 326-07-020)
SECTION I: PRO,�CT DESCRIPTION
Application No.: TR-2017-39
Applicant: Whitney Marr (Gensler)
Location: 21020 Homestead Road (APN 326-07-020)
SECTION II: FINDINGS
WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an
application for a Tree Removal Permit asdescribed in Section I of this Resolution; and
WHEREAS, the project is categorically exempt from the California Environmental
Quality Act (CEQA); and
WH EREAS, the necessary public notices have been given as required by the Procedural
Ordinance of the City of Cupertino, and theAdministrative Hearing Officer has held at
least one public meeting in regard to theapplication; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, theAdministrativeHearing Officerfinds:
1. That the tree or trees are irreversibly diseased, are in danger of falling, can cause
potential damage to existing or proposed essential structures, or interferes with
Draft Resolution TR-2017-39 October 26,2017
Page 2
private on-site utility services and cannot be controlled or remedied through
reasonablerelocation or modification of thestructureor utility services;
The on-site trees were evaluated for their health and their retention suitability and in most
cases the health of the tree determined their suitability for retention. No trees were
determined to be in good health and have good structural stability. Of the 14 proposed
removals, only three trees were evaluated with an above average health rating. These three
Mexican fan palms (Washingtonia robusta,) unfortunately were rated with a poor retention
suitability as the palms are located where the required stormwater control facilities are
proposed and the species is typically not designed to thrive in these areas. The other protected
trees evaluated were determined to be declining in health and/or have structural defects that
cannot be abated with treatment and would require significant management that may still
yield a limited lifespan.
N OW, TH EREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence
submitted in this matter, theApplication No. TR-2017-39, is hereby approved; and
That the subconclusions upon which the findings and conditions specified in this
Resolution are based and contained in the public hearing record concerning Application
TR-2017-39 as set forth in the Minutes of the Administrative Hearing Meeting of
October 26, 2017, and are incorporated by reference herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPM EN T DEPA RTM EN T
1. A PPROV ED EXH I BI TS
Approval is based on the arborist report entitled, "Arborist Report, Project
#5173.00," p repared by ,�ke M i n n i ck of H M H (#W E-11830A), d ated October 2, 2017
consisting of twelve (12) sheets inclusive of a landscape plan; except as may be
amended by conditions in this resolution.
2. CONCURRENTAPPROVAL CONDITIONS
The conditions of approval contained in file no. ASA-2017-05 shall be applicable to
this approval.
3. TREE REPLACEM EN T SPECI ES
The applicant is required to plant, at a minimum, a medium-sized shade tree in the
public plaza to the satisfaction of the City in consultation with the City's consulting
arborist.
Draft Resolution TR-2017-39 October 26,2017
Page 3
4. TREE REPLA CEM EN T SI Z E
The applicant shall provide adequate tree replacements for trees proposed to be
removed in conformance to the replacement guidelines per Cupertino Municipal
Code Section 14.18.160. The size of the proposed replacement trees shal I be mod ified
as follows to be consistent with the City's Protected Tree Ordinance unless deemed
infeasibleby theCity'sConsulting Arborist:
a. Diameter of trunk size of removed tree up to 12 inches shall be replaced with
one24-inch boxtree;
b. Over 12 inches and up to 36 inches shall be replaced by two 24-inch box tree
or one 36-i nch box tree; and
c. Over 36 inches shall be replaced with one 36-inch box tree.
If it isdetermined that it isphysically not feasibleto plant the required replacements
trees, the Applicant may pay in-lieu fees determined to be appropriate by the
Community Development Director.
5. A RBO RI ST REV I EW
Prior to building permit issuance, the number, location and species of trees shall be
reviewed and approved by the City in consultation with the City's Consulting
Arborist.
The replacement trees shall be planted prior to building permit final. The Applicant
shall provide the Department of Community Development adequate
documentation, including, but not limited to, photographs, receipts or invoices, to
verify that replacements have been planted. The City's consulting arborist shall
inspect the trees after planting and a report ascertaining the good health of the trc2S
mentioned above shal I be provided prior to issuance of final occupancy.
6. PROTECTED TREES
The applicant understands that the replacement trees may not be removed without a
Tree Removal Permit and that they shall be responsible for ensuring the proper
maintenance and care of the trees. The applicant shall also disclose the location and
species of all replacements trees on site upon sale of the property.
7. I N D EM N I FI CATI ON
Except as otherwise prohibited by law, the applicant shall indemnify and hold
harmless the City, its City Council, and its officers, employees and agents
(collectively, the "indemnified parties") from and against any claim, action, or
proceeding brought by a third party against one or more of the indemnified parties
or one or more of the indemnified parties and the applicant to attack, set aside, or
Draft Resolution TR-2017-39 October 26,2017
Page 4
void this Resolution or any permit or approval authorized hereby for the project,
including (without limitation) reimbursing the City its actual attorneys' fees and
costs incurred in defense of the litigation. The applicant shall pay such attorneys'
feesand costswithin 30daysfollowing receipt of invoicesfrom City. �ch attorneys'
fees and costs shall include amounts paid to counsel not otherwise employed as City
staff and shall include City Attorney time and overhead costs and other City staff
overhead costsand any costsdirectly related tothelitigation reasonably incurred by
City.
8. NOTICEOFFEES, DEDICATIONS, RESERVATIONS, OROTHEREXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant to
Government Code Section 66020(d) (1), these Conditions constitute written notice of
a statement of the amount of such fees, and a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90-day
approval period in which you may protest thesefees, dedications, reservations, and
other exactions, pursuant to Government Code Section 66020(a), has begun. If you
fail to file a protest within this 90-day period complying with all of the requirements
of Section 66020, you will be legally barred from later challenging such exactions.
PASSED AN D ADOPTED this 26th day of October, 2017 at a noticed Public Meeting of
theAdministrative Hearing Officer of the City of Cupertino, State of California, held by
the Director of Community Development, or his or her designee, pursuant to Cupertino
M unicipal Code Section 19.12.120.
ATTEST: A PPROV ED:
EI I en Yau Ben j am i n Fu
Assistant Planner Asst. Director of Community Development
PROGRAM INFORMATION , ���
Ba n k of Amer�ca
��
LOCATION INFORMATION HOMESTEAD ROAD °
21020 Homestead Road
Corner of Homestead and N. Stelling Roads Homestead Road
Cupertino, CA 95014 (E) CITY STREET LIGHT r � r
TF-DENO-GR (N) CURB CUT � ARC LENGTH: 62.97' NeW S O e
24'-0"WIDE � � R.O.W. DEDICATION TO THE CITY OF CU RTINO REL ATE 'I�I-f��QffAf�-�113:L�0(�TION
FLAGSHIP m Z
� m 21020 Homestead Road
� CURVE
• (7) OFFICES ~ 0 �
• 3 ATM DAY 1 0 � � o , „ , RADIUS: 40.00� Cupertino, CA 95014
� �
� � S 8 9 4 7 0 0 E 1 2 9.6 3 ; Z O N I N G I N F O R M A T I O N
• (3) TELLERS W/ BR �
GLASS � —
� � Proposed Use: Bank
� — �
� I
• (10) WAIT SEATING — � � _ — — � � SERIAL NUMBER: CA
� '� I
• 1 LG UCC � � � �
� ) � ' , � �-� , Hours of peration. . - Thurs. -
2 ���, � i(����, ,I _�.�, � O Mon 9 5
� � � � NRSP VERSION: 2.0
• (2) SM UCC �o � � ���,� �%���� �RT ooNsiTE �� '� �04 ��`�,���� � �; Friday 9-6
• (1 ) WU N.D. � � ----- � y _ BULLETIN. 2017-3
o ------------- — �
� — RECYCLING �
,
Aoo.52 � Saturda 9 2 '
I � �
� � ����� Sunday Closed
� � � � v ���:.�
�� I i � I �
—� � � �� � �� Number of Projected Employees : 13
;
� (E)2 x 20 � I � � \ � Number of Projected Users : To Be Determine
SEMENT NEW N NEW �
PACIFIC BELL �, MONUMENT
SEWER � A � 2101 Webster Street
� Suite 2000
s R��E ' � ��`�°� , — SITE REQUIREMENTS
� � Gensler
—�— � � Oakland,CA 94612
1 � � G��� Q� � Telephone: 510.625.7413
� I �AG Facsimile: 510.625.7499
�, SETBACKS - Title 19 :
TRELLIAGE � I � \
SCREEN � � I ��� �' ',� Front Setback: 22 FT (building height).
PLANTING � � ' � � � � � � �� � �;,;`�so
� ��\ �^��
�, i
� o 0 0 0 0
' ��
� � � � � � �';\
� � '��
�1
I � I �i� �l
� o � �� �� �� �� �� �� ��� � �
,�
, � . . . . � � '�
� - - - - - � , ,
� � � o � ! ',
I I I FEC � '
� � HEIGHT.
� ------ -- � i �
� � � � �� _____ __� _ _ � � � � Height Limit = 30' at Stelling Gateway Area
I I ,
I I � � � � � Q I �� �8 Proposed Height = 22
+ I I � � � �° � � � � � I � Proposed Number of Stories = One Story
I I � ', ', 0 0 ', ', �,
� � � �� I� PAVING AREA
I I � � � " � � -----_ ___ -- - J I
� ��II � I nIH 12,782 sf existing
, I I � �
� � , � I - � 1 V V �I � Issue Date&Issue Descri tion B Check
� � � � I p u � �� � 15 730 sf proposed replacing all of the p y
NEW � _ _ � _ _ � � � � ; [� � I � I I existin avin 62%of site as avin 01 08/31/2017 WM AH
DISPOSITION OF (E) TREES �NDERGROUND � _ _ _ � � � I � � I UP I� I g p g' p g PLANNING COMMENTS#1
ELECTRICAL � I � I� � I I LANDSCAPED AREA 02 10/18/17 WM AH
SERVICE � T I PLANNING COMMENTS#2
� � 203 sf corner landscaped area
All existing site trees were deemed unsalvageable NEW � _ � o � o � I II 641 sf parking lot landscaping
due to condition and unsuitable for TEL/DATA _ _ _ _ _ _ _ � I I
proposed site uses - all current site trees SERVICE I � 24HR vEST. I 25'-2" SETBACK ' � 5,786 sf total
I � o
are planned to be removed. I � 23 /o of lot area
�I � � � � � I� B KE PARKING - title 19 19.124:
I � � � I P RKING (4) I I
Z Proposed Building Size: 4172 SQ. FT.
� I GM � I� I .
N OT A PART O F T H I S S U B M ITTAL � � _ �GM � � � Space/sq.ft.: 250 per SQ. FTG.
r I� � � y = 17 spaces reqd.
D a � � ° _ _ _ _ _ _ _ _ = _ _ _ _ _ _ _ _ _ _ _ _ = _ _ _ _ _ ���
SIGNAGE DESIGN, LAYOUT, LOCATION OR _ _ �� m 33 spaces provided
� � - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -Ti - - �
sizE P RO POS K of AM E R I CA H B �P � � = (None are Compact Spaces)
° ° ° ° ° ° � � Bicycle spaces = 1 / 1250 sf bldg.
� � 4 spaces reqd. at entrance
TRELLIA E
SCREEN � Accessible parking spaces required = 2
SD PLANTI G �--� � � � Q of which one is required to be a
� 9 �� � � � van accessible parking space
� 9�-��� o � � - - - WM � per CBC 11 B-208.3
� TYP. � � Foc
o Q o � I� I Clean Air Vehicles per CAL Green
� �� �� i
� CLEAN CLEAN CLEAN �e PAR � �e I I 3 spaces required.
z AIR AIR AIR (VAN) One full-folia�1 e tree for ever
VEHICLE VEHICLE VEHICLE I y Y
5 parking spaces = 7 trees
4% of site dedicated to bio swale
surFace as our new impermeable
. �
surface arkin lot is 10 000 sf
�� �� P 9 �
iil ,I I
N COVERED TRA EN OSURE AD TH RAISED ACCESSIBLE PATH TO � i � L E G E N D
� ) �
(N) CONCRET PR TRASH ENCLOSURE � � P RO POS E D PARKI N G � ' � N o
� N so (E) STORM DRAIN
ao � TO REMAIN
� � � o
i I I o (E) CITY UTILITY POLE
ao � � �
"' � TO REMAIN
�
�� NEW PARKING LOT
RECOLOGY i � LI G HT STAN DARD
TRASH
B�NS LOCATIONS
02 0 Sp �I � (E) PROPERTY LINE
A00.52 � TRASH LOADING 12 ❑
I Seal/Signature
(E) CHAIN LINK FENCE
� � � I GM (N) GAS METER
LOCATION
�� � I — — — — — — — —UNDERGROUND UTILITY
I �
� SERVICES
� REMOVE (E) ELECTRICAL TRANSFORMER
REPLACE WITH UNDERGROUND TRANSFORMER S.E.D. ��\ I I � EXI STI N G S ITE U S ES
S89°47' 134.18' + II I I Pro�ect Name
GO gle Maps 21020 Homestead Rd �
I Bank of America - Homestead Road
��
�,.,„�,,::,,o Existing Office Building 5265 sf
_ `"'"°`°�'_° - iy68o2� Existing Uses include: Chiropractors, I prototype Layout
c � .
�' a '1 0
, � � = sS��� Beauty Salon & Massage Therapist
._ .� , e:erop - �
' ?
o *�'�,Q � � 9 I CAD File Name
, ,,.,,,,V�o, a � � ' 3" Existing Building Height 14.8' MEDIUM
� � � R =W����;%.�. Existing one-story building
- ; } � = ° - -
_ 33.2502.002
. ���,eai � r'wye rammead �
� � ,�., � _ _ , ,��,�.,,s�` I Description
_ �3�030Nsiw0��dNetl
- ����-�����j�����a��� SMorta aternxo R.O.W. R E Q U I R E M E N TS PROPOSED SITE PLAN
'�.. - TlreMorMnam RoxsD��ftlbrl.�ifO $a�Owoy
Q Q/IOmHIl00 Hq�$Ch001 PpehmpMf�
er���meio.�n�ey� - vu cnurcn
,� kr O Cw.rtmor=:
Jun ro Serre f+n I
be
�, - � Dedication of 10'-0" Wide Ri ht Of Wa strip at Scale
J Y
,. :... .:D =.
_. n.oic amaoe0 .
� � , �p,,,�„�,�,� each public way for City Sidewalk and
m � ���,0 10�_ ��
� � planting strip. Applicant provides plat map,
�� 0 •1:i � � ,, c ; ..�yc c •rr,,,
�-�����y��.��� Go gle . � ; , ROM CU B, TYP. City will write the dedication. 10'-0" from � 2' 4' 8' 16'
"'' � face of existing street curb. � �
�0 O ■ �O Ref. North
(E) BUS STOP
VICINITY MAP 2 PROP,OSED SITE PLAN �
ALE. 1 1
F.A. R. CALCULATION , ���
Ba n k of Amer�ca
��
HOMESTEAD ROAD °
ZONED: P(CG)
Homestead Road
APN: 326-07-020 New Store
Parcel B
Existing Lot Size: 25,422.15 SQ. FT. From (E) Survey 21020 Homestead Road
(N) Street Easment: - 1 ,259.04 SQ. FT. (subtract)
Net Lot Size: 24,163.01 SQ. FT. Cupertino, CA 95�14
---- - \
� �
- - - ---- - - - _ - _ - � � Building Size: 4172 SQ. FT.
I I - - - - - - � �
- — \` Net Lot Size: 24,163.01 SQ. FT. SERIAL NUMBER: CA
�
�� � NRSP VERSION: 2.0
I � i I � ��
�
� i �
\ REIO 0 LSNG \ \ � FAR: 17 BULLETIN. ZO 1 / -3
\ .
, \
� � �� � Proposed Use: Bank
I i � I � �
�
I (E)2 'x 20' ELECTRICAL I � � � �
� SEMENT FOR �
PACIFIC BELL �
79�-0�� � � � 2101 Webster Street
� � � Suite 2000
������� Oakland,CA 94612
� Telephone: 510.625.7413
\ � Facsimile: 510.625.7499
�� \
� � �
I , � /
SD
I \ 1 /
`,��
,
;
, � �' �ii
i ���
� '
� � I �� Issue Date&Issue Description By Check
� II I
01 08/31/2017 WM AH
I I� I PLANNING COMMENTS#1
I � 02 10/11/17 WM AH
PLANNING COMMENTS#2
I �� I
I I
0
,
0
N
� � z
� ,� � �
� � �
�- m
, , �
� ,� � �
i �
' Zo�-6�� G7
so � I �
I 0
I WM �
I Foc Pi �� 4
� —
CLEAN CLEAN CLEAN
AIR AIR AIR II
I VEHICLE VEHICLE VEHICLE I
III
I � i� I
I o
,
I II
N SD
I I I� I
I �
I I� �
I SD
Seal/Signature
� I
I I� I
I �
� I
�I I I Project Name
�
� I Bank of America - Homestead Road
�
�� � �I�I
Prototype Layout
MEDIUM
ICAD File Name
33.2502.002
IDescription
SITE DIAGRAM FOR FAR CALCULATION
I Scale
0 2' 4' $' �6'
� �
�0 0 ■ � � Ref. North
KEY NOTES . ���
BankofAmer�ca
��
�
Homestead Road
New Store
21020 Homestead Road
�ETA� PA�E� Cupertino, CA 95014
ROOF OVER WOOD
STRUCTURE � �
� SERIAL NUMBER: CA
NRSP VERSION: 2.0
BULLETIN: 2017-2
coNCRETE APRON
2101 Webster Street
G e n s I e r Suite 2°°°
Oakland,CA 94612
Telephone: 510.625.7413
Facsimile: 510.625.7499
0
S�OPE �
1 4 PER FT. � �EVE�
CONCRETE S�AB
03
A00.52
�
�
�
�
z I Issue Date&Issue Description By Check
Q
� 01 08/31/2017 WM AH
� � � PLANNING COMMENTS
0
0
�2 —�
TRASH ENCLOSURE ROOF PLAN � COVERED TRASH ENCLOSURE PLAN 2
SCALE. 1/2 —1 0 O SCALE. 1/2 —1 0 0
OPEN
SPACED REDWOOD
SIDING
A�� 4 SIDES
OPEN
PAINTED STEE� DOORS
ELEVATION TRASH ENCLOSURE O3 .
SCALE: 1/2"=1'-0"
Seal/Signature
1'-0"
GRADE
PRECAST CONCRETE
WALL EDGING W/SKATEBOARD I Pro�ect Name
DETERRENTS Bank of America - Homestead Road
, .�
� Prototype Layout
-...,... . _�,��„�,�. �.....� . " MEDIUM
� � CONCRETE SEAT
I CAD File Name
' WALL AT STREET CORNER 33,2502.002
IDescription
`� SITE DETAILS
�
,�""'r
..�,.�_ __
_,i�, PRECAST LEDGESTONE I sca�e AS INDICATED
� � WALL FACING: CORONADO
,.�..;� �_
PROLEDGEOAKBROOK
t
WALKWAY
/
A00 . 52
Ref. North
SEAT WALL FACING MATERIAL SEAT WALL O4
SCALE: NONE DT MW 0086 SCALE: 1 1/2" = 1'-0" DT MW 0086
. ���
I�
BankofAmer�ca
0
, Homestead Road
385��-0�� New Store
21020 Homestead Road
- �E�r��1�E R�a� Cupertino, CA 95014
Qo O HOMESTEAD ROAD SERIAL NUMBER: CA
i NRSP VERSION: 2.0
� D BULLETIN: 2017-3
m Z
m
I
S89°47'00"E 129.63' �
- - -
�
' LECTRICAL � �
� EAS ENTFOR
Z � I PACIFIC�F�LL �� I
� �
o � � �
� �
2101 We ster Street
�� , � � Suite 2000
i i ������� Oakland,CA 94612
� � � Telephone: 510.625.7413
� \ Facsimile: 510.625.7499
� � �
� � �
� � i
i
� �
�
U
�� �yll8
� 3 Nf/�
T
�
� �
OI � Issue Date&Issue Description By Check
� 01 08/31/2017 WM AH
� � , PLANNING COMMENTS#1
� � 02 10/18/17 WM AH
PROPOSED BANK of AMERICA BRANCH BANK -�
_ W PLANNING COMMENTS#2
0 0 0 0 0 0 0 0 0 �
�, � � �
o � _ Z
Z ' I
CLEAN
AIR
VEHICLE � �
(VAN) I
PROPOSED PARKING I � o
_ �,
�
M
W X
� ` Q
�
S� �II
� I
S89°47'00"W 134.18' � �
824SS w26
93,
I
I
I
CONTROLLED INTERSECTION 7-2 PASSES �
SCALE: 1/16" = 1'-0"
ISeal/Signature
�
�
IProject Name
Bank of America - Homestead Road
I
IPrototype Layout
MEDIUM
ICAD File Name
33.2502.002
IDescription
SITE DISTANCE DIAGRAM
I Scale
p 4' 8' 16' 32'
A O 0 ■ �� � Ref. North
�
EXTERIOR FINISH SCEDULE . ���
STUCCO / PLASTER BASED ON PAREX STUCCO Ba n k of A m e r i ca
��
� ) �,
[BAC PRESCRIPTIVE] /"BASIS OF DESIGN"
ST-1 10409"TUNDRA",SAND FINE FINISH Home stead Road
ST-2 10432"WARM SAND,"SAND FINE FINISH
ST-3 10447"MOSS",SMOOTH FINISH
ALUMINUM COMPOSITE METAL PANEL New Store
[BAC PRESCRIPTIVE] /"BASIS OF DESIGN"
ACM-1 "BRITE RED" #4MMBTR
ACM-2 "RVW WHITE"#3MM4RVW 21020 Homestead Road
ACM-3 "MATCH STOREFRONT" Cupertino, �A 95�14
- GLAZING [BAC PERFORMANCE]
+20'-0"� GL-1 1"HEAT STRENGTHENED CLEAR INSULATED GLAZING
T.O.PARAPET
GL-2 1"TEMPERED INSULATED GLAZING
+18'-0"
T.O.PARAPET GL-3 1/2"TEMPERED MONOLITHIC GLASS SERIAL NUMBER: CA
� 'QQ GL-4 5/8"TEMPERED MONOLITHIC GLASS NRSP VERSION: Z.O
� ���� � Q`�Q�° � ALUMINUM GLAZING FRAMES BULLETIN: ZO17-2
[BAC PRESCRIPTIVE]/"BASIS OF DESIGN"
21 O2O AF-1 CURTAINWALL SYSTEM
ACM-1 AF-2 STOREFRONT SYSTEM
�� / � � / � � STUCCO ACCESSORIES (ALL PAINTED EXPT-3)
- SA-1 WIDE CHANNEL SCREED
SA-2 NARROW CHANNEL SCREED
SA-3 MODIFED CHANNEL SCREED 2101 Webster Street
/� � � � Suite 2000
/ , METAL COPING [BAC PERFORMANCE] Oakland,CA 94612
G e n s I e r Tele hone: 510.625.7413
MC-1 PREFNISHED METAL COPING CUSTOM COLOR:TO MATCH ST-3 p
Facsimile: 510.625.7499
0o EXTERIOR PAINT
[BAC PRESCRIPTIVE]/"BASIS OF DESIGN"
+a�_o„
FINISH FLOOR EXPT-1 [N185]COLOR:HC-102'CLARKSVILLE GRAY',MATCHES ST-3:MOSS
EXPT-2 [N185]COLOR:HC-80'BLEEKER BEIGE',MATCHES ST-2:WARM SAND
EXPT-3 [N185]COLOR:CLASSIC#1039'STONE HOUSE',MATCHES ST-1:TUNDRA
ST-2 ST-1
EXPT-5 [P25]COLOR:#2133-50'PIGEON GRAY'
(BASED ON BENJAMIN MOORE)
NORTH ELEVATION - HOMESTEAD ROAD �
SCALE. 3/16 1 0 EE 01
I /� Issue Date&Issue Description By Check
�� +zz�_o° 01 08/31/2017 WM AH
T.O.PARAPET PLANNING COMMENTS
+20�-0"�
MC-1
MC-1 T.O.PARAPET
+18'-0"
T.O.PARAPET ,'
■ '`� � �'��
' Ban k of Amer�c� �
BankofAm rica I
ACM-1 C ACM-1
� �
x /r � / / -
� .� i
r
00 00 \ / � 0
+o,_o„ �` , /
FINISH FLOOR
( ST-2 � ST-1
TRELLIAGE SCREEN PLANTING
WEST ELEVATION - SIDE 2 EAST ELEVATION - N . STELLING ROAD
SCALE. 3/16 - 1 0 E E 01 SCALE. 3/16 1 0 E E 0 3 �
+22'-0" `
T.O.PARAPET /
MC-1 - +,s�-o° �
T.O.PARAPET
B n k of America '
ACM-1
f
� � � Seal/Signature
0
\ /
+�,_�,.
FINISH FLOOR
ST-2
TRELLIAGE SCREEN PLANTING
IProject Name
Bank of America - Homestead Road
SOUTH ELEVATION - REAR 4 NOT A PART OF THIS SUBMITTAL
SCALE. 3/16 - 1 0 E E 01
Prototype Layout
MEDIUM
BUILDING SIGNAGE SHOWN FOR INFORMATION ONLY - I CAD File Name
BUILDING AND SITE SIGNAGE UNDER SEPARATE CITY 33.2502.002
APPROVALS. I Description
EXTERIOR ELEVATIONS
Isca�e 3116"=1'-0"
0 2� 4� $�
A09 . 11
. ���
a n k of Amer�ca
�
Homestead Road
New Store
21020 Homestead Road
Cupertino, CA 95014
SERIAL NUMBER: CA
NRSP VERSION: 2.0
BULLETIN: 2017-2
2101 Webster Street
G e n s I e r Suite 2°°°
Oakland,CA 94612
Telephone: 510.625.7413
Facsimile: 510.625.7499
I � Issue Date&Issue Description By Check
� +18-0 ROOF +'s�-o°� 01 08/31/2017 WM AH
T.O.PARAPET ROOF TOP T.O.PARAPET
TOP PLANNING COMMENTS
UNIT UNIT
+11'-0" �
� BOT.OF CANOPY
■
■
■
■
TRELLIAGE ;
SCREEN :
I ' PLANTING :
■
� � TELLERS BANK INTERIOR OFFICE �
D R I V E WAY � +o�-o�� � �
FINISH FLOOR
SIDEWALK HOMES EAD RD.
w
z
J
d
�
�
d
TRANSVERSE SECTION THRU HOMESTEAD ROAD �
SCALE: 1/8" = 1'-0" ���
+22'-0" �
T.O.PARAPET
�1+18'-0"
� T.O.PARAPET ROOF ROOF
DISH TOP TOP
� UNIT I Seal/Signature
■
+11'-0"
• BOT.OF CANOPY
■
■
TRELLIAGE � �
r
SCREEN ; , � �
PLANTING : BREAK -
� ATM
I - • ELECT. NETWORK ROOM OFFICE BA K INTERIOR � ,
� DRIVEWAY i ` +a�-o° � �
FINISH FLOOR �
w 24 HOUR VESTIBULE SIDEWALK N. STELLING RDo I Project Name
z
I J Bank of America - Homestead Road
a
� UNDERGROUND
a ELECTRICAL
TRANSFORMER I Prototype Layout
MEDIUM
ICAD File Name
33.2502.002
IDescription
BUILDING SECTIONS
Isca�e 118"=1'-0"
0 2' 4' $' �6'
A09 . 15
LONGITUDINAL SECTION THRU N . STELLING ROAD R �
SCALE: 1/8" = 1'-0" ■r� �
. ���
PLANT LEGEND B nk f Am r� ��
a o e ca �
SYMBOL QTY. SIZE BOTANICAL NAME COMMON NAME SPACING/ NOTES
TREES Homestead Road
S4 G1 G1 G3 G3 G� G1
T1 5 24 Acerrubrum 'Autumn Blaze' Red Maple -- � � � G3 G3 G� ��� ���y.�
i 1
i - - - _ 6
- - - - - - - - - - `
T2 2 24 Zelkova serrulata 'Green Vase' Sa❑leaf Zelkova Tree Grates in Side❑alk Area i/ _ �, - i I - - - - - - - - - - - - - - \ - - - - - - - - - - - - - - - - - -
% I - - - - _ i T. � �.� � _ -� _ :.�►. �►�
T3 9 24 Lagerstroemia 'Tuscarora' Crape Myrtle -- S4 S6 - - - - J - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ��� '�► �►` O� � �
21 0 H mestead Roa
\ -- - - - - - ' __ ,�_ __ _ G1 S5 T3 Cupertino, CA 95014
SHRUBS � - -- - - --
� ; �r'� � ' �- _ --- - -- -- - -� `
i `. � � y ��
� � T3 \__ �
S1 14 5 Osmant❑us ❑eteropCyllus 'Variegatus' Holly Leaf Osmanti lus Spaced ❑ 48" o.c. max. / � i � �^ i � � �-__ _ _ i �� � ���� ��� �
S5 � I i � � � i / � 'i . . � � � l� .
S2 12 5 Loropetalum c�nense 'Burgundy' CC�nese Fringe Floi ier -- � �� �/ � � ��• : �� � � � �� � SERIAL NUMBER: CA
� � � � � �
� � � � � � � �`7 ' � G5
►
, � , • � ; := ►- ` ��� ,�� � '� ' % NRSP VERSION: 2.0
��
S3 17 5 Nandina domestica 'Gulfstream' Heavenly Bamboo Spaced i 36" o.c. max. �� C� i i i ��� ������� �� �� �
. . - �► � �
S4 18 5 Cistus -ybridus W�te Rockrose -- � < � `.:: ` �i►� ,i�- '-�_ � �� --�- � --------G3
_
�
, _ '
--- .
- - „ . �
- �.- -
� � � � �.:��� �
. . �►`
, � r
,
� � ,
, _
� � �.. ..� � � y
_ T3 r � � � � � , ��� � � � ��- �� � . . , ,
S5 8 5 Ci ]amelaucium uncinatum 'Purple Pride' Geraldton Wax Flo-er - „�„��,,; � � � �� � � � � ►� ` �,�, � � �' �j
_ � i � � � � � � �� � ��►� � �y'L/ h,
� �� � /�� �
j��,,�� � S6 ��A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� ��� � ►�� � ����`�'� �4 ��f " �
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 � � � � � �
S6 11 1 Coleonema pulc❑ella 'Sunset Gold' Breat�of Heaven -- GZ -� � ��^�, � %i����i�����i�����i�����i�����i�����i�����i�����i�����i�����i�����i�����i�����i�����i�����i�����i���' 'r►' 'f►' ��� �/� �` 2101
�N�+��s \\ �._�` , � l�Z/� r"� � ,
GRASSES/ PERENNIALS/GROUNDCOVER/VINES ��. � � � �� � � Webster Street
�� ; � s � �
��"�� ; ; G4� ' �� � �� � ' � %��, � Suite 2000
'��^�, � i S3 G6 � � G6
= , ��� � �, ,` �\
� � _ , � � Oakland, CA 94612
��"'��s � � �S 1
'���� ' � � � � Tele hone 510.625.7400
G1 35 1 Rosmarinus officinalis 'Prostratum' Rosemary Spaced � i 42" o.c. max. , �` % ` �j �► ������� p
�
������,�; � ��r� �` , ��� '� '��� Facsimile 510.625.7499
, � = � �G7 .�► �►�► � : �:
G2 160 1 MuJenbergia lind-eimeri 'Autumn Glon' Mudy Grass Triangular spaced ❑ 36" o.c. max. = �� � �' �
� �� � � � � ����i►`� � � ►
� ` �
����- �� ' � : : `��� �� � � � Landsca e Architecture:
��^�, � s �►i.��-�►• : �T �►� , p
G3 11 5 P ormium 'Maori Maiden' Ne- Zealand Flax - � _----- � �� '
-- _�F�+����� ; s T3 - �:. �?�� �i►` ','
��
' � "� ' � ' `� �� '"" ��� G3 Pa vement En ineerin lnc.
� � � � � �� �� � g g
� � �- �
G4 65 1 Cotoneaster dammeri 'Lo-fasY Bearberry Cotoneaster Spaced ❑ 48" o.c. max. -���C��, � ��
�'N�+�� � � �G7 � � � �
� �` � You can ride on our reputation
,�,�,� � �
�� � 3 ` � �.
/
G5 14 1 Coreopsis verticillata 'Moonbeam' TI readleaf Tickseed Spaced ❑ 24" o.c. max. ���"'�s ,� � � G6 � � Corporate Office.•
� ��"'�, ; � � � � � � � G� • 3485 Sacramento Drive, Suite A
����,,���' ' � ���� Bl'1N K �� l'1M E R��{'1 � � � � � � , �%� San Luis Obispo, CA 93409-6095
,, �.�
G6 38 1 Tulbagi fa violacea Society Garlic Spaced ❑ 24" o.c. max. �,,���� � � � 805-�89-2265
�
s
���i � � � �G7 � � � _
G7 12 1 Clytostoma callistegioides Violet Trumpet Vine -- �� �,�,,,,, � � � I � i �
�� �,
� G4 S6 � �
, �`P1�''% �� � T3 Pa�ment EnLjneerinlJlnc.
;N�+��� , T� � � �� S6 � � � �G3 Attn: �nathan Edholm,Pro�ect Manal �r
G2 � �� ���'�' � �G7 � ' � , 3�0 CCpress ❑riC� Suite 3
�� '�` � '
- ���; � s Petaluma,CA 94954
��
�N��� � X/ � � � � � T: 707-769-5330
'� �
�
, ��`�'�% ---- - ---- � � E-mail. 6nathane p C�mententineenn lcom
� I ❑ a
�N�+�" .
,� ;, .- �- b+e_� '�^�;
� � ':-�.�,;,r:;:. Acer rubrum Autumn Blaze `a: 1 : . .: • ��.`Y ' ����.�'�'` White Robkrose ,��'�� , � T3 `
.� �� -c� . � � �'-�C'� Landscape Architect: Mike Wasden
�� a� ,�� �e: :.
�� , � � - i License: CA I 4669 E I �. 10 f31�O 1 I
�
� z a C�
� � ��� : �, � ` �M j . Red Maple � �r ���� ,�-. ����,`�" I
.: . ; ' _ , S '� �, ��
� n `�r Y „�,. . `-. r�� ci - J�
., -cr` '� . t
-... ; ' : �1 '7"3F � ^�'�'��. ,
�c� - "f '�7-� 5 �~-�`�.,• u;� ' Evergreen S�ub ' �
'�x ,�
�r
-�.n ;r: h 3l., i... . � .�. . I
y '4r...,.�� �
Deciduous Tree �b,r ` T w� ,,r �.: -----, � �
� ,,. �N� ,
� ��'� � ��� � ������ ��������� . . �`'�. '� g�_:= �� �.. ��"�� 4' �gC/8' �ide max. ❑ maturity(usually ��F��� V���� -- �.:. � - �G3
�,. xr�Sc �� �� � ��'��� �, . 6�� �Jn C�4�� �IIC�e � I'T1atUflt �, ���.. � i� �� ��-� � � � ����q�� � � � �� � _ /
s �
-
p� . ,_ r�s r '� n :J �/ . �.� .
�._ � _ ,�-� � � .�- - nrx � smaller, around 3 �gC by 5 ❑ide) % �� G7 � w
...
� . � �'r� ��,, ��-�: s t..e, �•� �,_.,, �F�+��� G7 G7 G7 , � �
� ; `�.. - _,
,� � -. ,�, � ,
� � � �; Regular � ater . .r V f , , � �
.. �. ,
� ,
p�.. . � . �,�� � :��,.� ��� �,x, mal Cater „ �� � � �
� � �
4..:, �... .. - -., .
� � �. . _ ., Mini , , � � - i
_. . _ .,,
. .
�
T2 � �� T2 � � �
: ��� .- _._. �.-•� ��^�,,
�, .� , ,� -�_ , �_.�„r� ,�, �� ,' ,'
.
���". ��" � � `� Moderate to Fast ro❑t�rate '` �+ '�„ ----
� . � � G1
� �^� „�::� 9 = ;� "�4 � � , _
��:
;
s :
� ;..�- , '�-. � �'s _ . . -,.� Carefree s rub tolerant to d ougrt, ❑eat, � ���, �
k
_
� �
_. �
� �, �� �� � � �, � �� S2 �
-z� � �;' �r; r �. �'':���' � poorsoils, uind '��'��� �
�` `� 1 .� � Tolerant of �eavy soils or soggy ground �, � �• - ����; �I ! S6 �
� �.� � .��� '���--� `�`4 .� (i.e. in drainage s❑ales) �<z . _ - � .;: � � �F��` � G6 �II� ' � � �
f
� �•� � �,,� ��' , W�te flo❑ers ❑/yello❑ centers in Spring, �� ���; , ,; ,,��I�,,, _
�"�� �� � r � ���� Summer ����� , y y ;�,� � y ;�� � ��� �s� , -G3
� � �; �� �.�.�� � � � �:.� Good sCade tree, brilliant red foliage in t❑e - � �� ���, il� S6 � I
-- *� �- ...-�-� ,�,.. � � � �� CCemelaucium uncinatum Purple Pride' �� ��,�� �� � , �
--�,."'�`:'�.�„� � ...�, Fal l. .� .� � -��.�:.,. Geraldton Wax Flower %��,�,���� �►.� i
'P°�- k A` ,rY;: ,.� . . .. .. � `'li I
. . . . . .. . .. �' .
_ `$-- . . _ :�.
,k . . ,
- t .r .--r" .�_. � � �
.:�-.,. � /
�.._ - . �
� f.�
, �
��}�k.� t r+�o": :� &�,,� _ �/ql�� -��� ,� I� ,
��.�� >; x� 1� ���� ;�.'" :- Evergreen S�-ub �i .i► ,
- �,. � ..._ . _�* �,.s <<F"`� - `': .� � .�►� S2 __ -
<�� .
� _ .. ,... _ , �c, : "; � -- -G 1
a�',
� -�� ,. � � � a i� � � � � ������% ��►� I �
� � � , ���� ,��� 6' �gC/6' �ide _ maturity (can be kept to ��,,,,,,, �� �
._� � �s� � � ��-�,� �,�,� � � , � �, . � ��
I 1 I Issue Date&Issue Description By Check
�z �� �� � �'�� 4 -eig� ❑it❑regular pruning) ��N�+��� _ T1 �► I �
�'���� - � • � _:
/ � �,� ��
�\
�.:� � � ����3 � �� G2 � ������ ; �.►�' i - 01 5/26/17 MPW MPW
�� Moderate ❑ater � �� fi
, � Zelkova serrulata 'Green Vase' ^:- � �� � � � �'��� ' ,'��`3'��� ., ���"'�; I No �
,� �
,; �
_ I�
� �
�i-�y,�,k' ,� r��- ,, , �; ���� � _: �'y�� >_ � � PnRKiNc -
� ��� �
�� ��.��<.,�r�.r��_ .�x�- Sawleaf Zelkova � . „ ,?u,� •:� � � � � � _ . � � �
�� Pre Planning Submittal
�� ��a��- �;�z �� `� �:� "�'� =�� '' Blooms in late Winter tCl-oug❑Spring, '�� ��"�% �� �-� �
� �
� 02 10/11/17 MPW MPW
�,;. �- �, `������,,; � Deciduous Tree +„�, � �� � �:���'� covered in rosy pink to purple flo❑ers ������r�;; \ ��\ i\
_ ,�„ -�� f � _ , � � \�,�j \ � T3 / � � Planning Submittal#2
,� ,� S2 �
� ���?, � � S4
, `�? �`�-` "�"� 50' �g❑/30'to 40' ❑ide ❑ maturity =� , , ;N�+�� � I
�'? � , �a�t^} �'� ,�� � Coleonema pulc❑ella Sunset Gold � � %� �
-�c-�' r .. '''" ,�`a��f, ,��' �A''�t � �� ' � BI"@afll Of H@aV@l7 �i„� �� � ���� � � �
�.�' � � ������ Moderate ❑ater � � ,n;��<„ ��, �� � � � � �
� �' � �' ,�; � �� ��� �% �
���� � �� � �� �; - i
�' ` � ��� '�` ���,�� � �.�+ Evergreen S�-ub � %% , '
,�'`� - ,����� Moderate gro❑t❑rate ; � r,�';r��� t, � ,j r�����"'�� � � �
��� �,
a r * , . .: �� ,
..Aa- ='.r�"_`+^ti' ' �`c s..�.� ' i, ' r s`,-- � �6� �� i i
�� 2' � ❑/4' ❑ide ❑ maturit �-,,,�����.� ; � T3 � �
�' Tolerant of ❑eavy soils, droug❑t, ❑ind w=`�� � ',;� � � , � '��y g y ; �
��•,;ti. �`I s'� � �� ;/,q���,` i
�� �• '��~ � �:��;�' " � � �' Moderate ❑ater - _ = S4
Not reported to be significantly susceptible � ' � �� '`' '�` i � � �
.���'� �� . � � � S2
to est infestations or disease. � �� `" �+�'� i �
,,,� , p ,_� •_ ,�.n �;�. �� Yello❑-gold foliage year round❑tiny pink S2 �
� _ �
- .�.�A�.•�3 IZ 4`, c.J� i�xf I I
�,, flo��ers in Spring ❑ Summer �' ����
p , � --��
�i'�Y a' 1'c�� 1] ". _ cn — - ' — _ _ .
�� ?� . ;.� JG I
.1. . �= Z_�. : � .� ...
"'`�L � �-�� ' �w,.'�"" `�: ' ` ,�. ,�'���,: Rosmarinus officinalis 'Prostratum' - G1
/ � , � t-.
�R , 1 ti- � � .�a �f i��a. :: ;.� . .�K.- c.•FZ" .� I ' I � ,
- � � � ��
� � :;; ,��,�� i� � + ;- Rosemary (Groundcover) I �I I
d..
' j�
x� ._. . -_ - �����. � _ '���` .�;� � S2 T1 I � �, � I
�` ,h � �...y .* � Evergreen Sa-ub ' �
ro-4. 'j"< � I I / � � -,
t� .:�
� � -� � , � � S1 �i � i
Lagerstroemia Tuscarora . � � ���..� t 2 �gC/4 to 8 spread ❑ maturity
,�= G3
�; , ,� ` � �,:� y ,}� i ' � i
� ���K.�' Crape Myrtle � �;� 4 � -�-� � �
„ � .' v , , r �, .. � � 1 1 ,
, � ° � i' / T T � i
;�� ��`� �.� � ��� ��#'� ����r� �'� �"' , •� Minimal to Moderate Cater /� "`"� � � �S2 -
�f
`-`� ���' Deciduous Tree � .ti� � �'� �� �w� � �.,� �� N'�w � :; � �� '
� -
� �t �,� ti�'c� � sh xa�;`� a'F°�r ��s.:7 � � -� � �
�, �
't � ��
� "�1�., � r �. �� ��� �� 1�,-`�> -i, .���i, i, i, i, i, i, i, �i�„
,�. , � _ , ,,
..-. ,� .� . � � ;�, , � � , , , , , , , , , , , , , , 'ri �+�i�i ��i�i .����Nyr—����i�i .����i�i .��44yr-. �i�i .����i�i�� �v�i�i .����i�i . �,,,
� �a� � .�.. ; .� ,�. . ��.,,��., , , ,:�.,� Ver tou ❑ C�ard roundcover ��-, . �, . �, . �, . �, . �, . �, � �, . �, . ,�-, . ���, . ���, . ���, �� ,�� ,�� ,�� ,�� ,�� , �� ,�� �� ,�� ,�� ,�� ,�� ,�� ,�� , � ,� ,� ,� ,� ,� ,� ,� , �;� ,� , �
�,�:..��: . � � Y 9 , Y 9 ; ; ; ; _� _� = = = = = --- G 1
, __ , �� �,�� �,�� �,� �,�� �,�� �,�� �, ��� �,�� �,�� �,�� �,�� �,�� �,
� . �� � � ��:: t � ., , � � � � � � � � � � � � � � � � � � � �
',.� - �, , �'� •,•�._ � � • • � �r q , ,� �;,� r k� .-`� - � � � � � _ � � � � � _ > > ; ; % �- ; ,- �� — �
'� -, - - - � � � � � � � � � � � � � � � � � � � �
20 � ❑/ 15 ❑ide ❑ maturit :� z
- � � � � � � � - � � � � � � �
- r �a.� �� �� �� �� �� � �� � �� �� �� �� �� �� �
% � �.(,k . � � � � � � � � � � � � � � � � � � � � �- � � � � �- �
, � , ,;,. �. ; .
. .., . . . . . , �, ,_ � . .
.,.. �.r�::�
i
9 Y �
�� �
� ,
i \� \� \� \� \� \� \� \�
:�"�F. \' \' \' \' \' \' \ \' \' \' \' \' \
,- y �iAi� � i/� � i/� iAi� � i� � i� � ,'i/� , i/i� , i� , i/� , i/� , i/� , i/i� , i/� , i/� , i/� , i/� , i/, , i/� , i/� , i/� , i , i/, , ,�i/� , i/� , i/� , i/�
Y� i i i i i i i i i i i i i i i i i i i i i
, , . . .., . ., , . .. . . .. ,'':. . c. ,; . - o 0 0 0 ' ' 0/ / / 0/ / / / / (�/ / / (�/ (�/ / i, �/ (/ (/ (/ (/ (/ (/ (/ / / /
. 0 0 0 0 � � � � � � i G � � �
_. „ � � � � � � � � d d d d d d d d � \ \ \ \ \ \ \ � \ \ \
� � r 1 1 lr 1 1 1 � 1 lr lr 1 1 lr lr 1 li � r \ r \ r lr \ r \ r lr \ r 1 � r li \ i \
. , , _. , . . ,.,. . .,- � / / / i/ i/ i/ i/ i/ i/ i/ i/ i/ / \ r \ r \ \ r \ r \ i r \ r \ \ \ r \ r \ \ \ r \ \ \ \ \ \ \ \ \ \ \ �.
� �� �. ,0%i�� ,0%i�� ,0%i�� /i� ,0/i� ,0/i�� ,0/i�� ,i, ,0/i� ,0/i�� ,0/i� ,0/i� ,0/i�� ,�/�i� ,i, i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i
�1��� � Q.I t. �.,� �. f �.. \\ �1 / �1 / / �1 / �1 / �1 / �1 / \ / �1 �1 / �1 / �1 / �1 / 1 / \\\ ��\\� �.\\� �.\\� ��\\� �.\\� �.\\� . � �.\\\ ��\\\ �\\ ��\\\ ��\\\ �.\\\ ��\\\ ��\\\ �.\\ \\\ �/\\� �/\\� �/\\� �/\\� �/\\� �/\\� �,\\ �/\\� �\\\ �/\\� �/\\� �/\\� /
r�''r�4 � ��.���� � - ��I' _ �1'.,:.��'� 4'I r �::' ` — �\��l�j\\���j\\���j` �j\\���j\\���j\\���j\\��/�\` ��j\\��l�j\\���j\\���j\\���j\\���j\\ �/� \ l J J j � � / \ j j j j j j j j i i
-.�..�.�,:;.� < . - �; ��,• t.,� ��tt ��. ��; Lig❑t blue flo� ers from late Winter tCroug- .� - ; _ "_ = - =
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
,�'� „ .�! _ - - - - - - - - - , � � � � � � � � � � � � � � � � = y � ° � ° � ° � ° � ° � ° � ° � ° � ° � ° � ° � �
. ..t.��•. k -` �'i �"i � �"i � �"i � �"i � �"i � �i � � �i � � �i � �i � �i �i > i �i �i �i �i �i �i � i �i �i �i �i �i �i �i �i �i � i �i �i �i �i �i �i �i �i �i �i �i �i �
�i- � ��•a �. �.�•`�.< r,.. !..�:::`:, � aU aU aU aU aU aU � �� ��� • �•�� • •�� ��� • i �1Li � �1Li � � i �1Li � �1Li � � 11 \� � , \�1l � \�1l \� � , \�1l � \�iG ,\�iG ,\�iG • I
-'=,.:'�:: ,� . ,, � �-��— —� , - —, ,�- � � � � � � � ' � � � � � � � � � � ��. �r���.. �4+d� �� i� il ii.��'lii.� ii�� ii��� li+� �—'14+� q+�2--�+� 4+� q+� q+�2--�+��qi�� qi�� qi
;
_ � , -. .
, ;��, �,a f .� Moderate ❑ater - ��_ �.�� � �:� q ,•��� . Spring ��h �+����' � ����"��� ��-��� � � � `�,� �, � � ��� � � � �-���� _ � � � i
Y
/ � �-�
z, .. x , �� _ . :�� � �-�.� . "s: � � /
-
� .
, . . � �
o �
.- _
: ,� �� w- �, � � � � �/ �,� �
�,� � � _ � � Slo❑ to moderate groCt❑rate � � I �
�i l ;,,a,.. „ c �`� �. -t��� � � � G2 G2 /�� �i� � � G3
�. ! -�- , i ,�;_,�. �. ��� Mu�enbergia lind-eimeri Autumn Glo❑ G2 � � � i
����� ��� " - -_ -� Tolerant of ❑eat�Tuscarora' ❑ybrid selected s''��� �,�,� ����,��i��� ''� Muhly Grass S2 � � �-� i
�,,� " �
for Cardiness ❑ resistance to milde❑ � ��'`� a��Y�; � -y�. -
�_ ' I
- �;�,,:_ �;���.� � t ,��j �R' Perennial Grass � ij�
;
, :
� #� - h� �- S�o❑y flo❑ers in Summer, Fall foliage color � " � ; i ` � � �� T3 /
t _ a , -
�°
.
�'= �
" s , �` `�""���� �`` ' , i, r , •�`�"� 4' �gC/4' �ide (stalks may reac-to 5') % G1
.�... < < � , : '��, ., i
�
1
�"`� ;x�� ' � i�i� 4 ��:`:� Minimal ❑ater � �'�o������'� � � Coreopsis verticillata 'Moonbeam' ,�� ,�� S4 S2
■ ..- Osmant❑us ❑eterop❑yllus 'Variegatus' � `;�,'�-"�� t � � " £ � � ��"'y�°�,��}.>{��°t�Z. �. Threadleaf Tickseed
q $'� 6 .. �} . � ` f ��i �A �\� �
� � y O� i .� a h�\ �, d1ll .,,1 �: � �, ����[, � �1,I �
y��� ;,, � "�� �,-` Holly Leaf Osmanthus ��' „ �� y �, � � Amber colored flo❑er stalks in Autumn '��`+.- � ` �'��„.;
y4`� r?��"u�'��"' � e�ti+ {. .i s �i,�,�, t��-'' � � „x ' V �1, 7R�`d.itL,� ��� �'j� .
� , , � , __ � 4,, , �- __,�}� , _ ,,,� Perennial
��•.'�'�✓° �. `�� �.r yk� r�:�� .+f*.._ " � i ��. �- \� r �: � "��' ' :
����- i .t` . � �?!�i' l� �,,y` 't . - yl4 . . i�n rr� .�.. sy�..
s .� ��,��> �; �,. - Evergreen Sa-ub ����I' q�� � ���' . Selected for on-site drainage s❑ale areas � -�►� � • �;�r . k ;
1�..✓�..Ai�i'� ,� �. r�. r� Ji f ,��/ %��� +',�., ��. 4,tif�l a` �� �� x : ♦ p
A
;t�� ,� ,f �� .. ��� �'�s ;,- n,,,� , �r � ��sr F�,. � -:>�� 2' � C/3' �ide C maturit I 9
� � > q , � can survive in -et areas des ite minimal � 9 Y Seal/Si nature
�h �� ":;� "��i�. ; �` ��'�� G2 "'`` ��` �'��' ���- � p - PRELIMINARY LANDSCAPE PLAN
d�` '' `�, � , 8' �g❑max. / 10' �ide max. i� maturity _ ,... , ,_ ,. ', -ater reCuirement) ` '+i� `�
'�+�. � 1 �h t.'A �� �'' �i
�� ex-•,� ,�r.' i .
�';`r��- �a�,;"�5%,�:;��� ;, ,�; ��.� (takes pruning - sCearing Cell for a 4 - 5' ,: .:+�> � Minimal to Moderate ❑ater
1"� 10'
�� �'�����,�` ,� � �� tall -edge) ��� . P❑�rmium 'Maori Maiden' +� ,, NORTH
z t,,� �.� . -.�,� ��;. Very toug❑plant, tolerant of droug❑t
� ,�� `,�' �"���. � � � New Zealand Flax '�. I�"
f ` Moderate � ater �� , ' � �.d.,�`
���'�;� ; ; , '�` �~ ' -� , � Pale yelloC flo❑ers from late Spring, into
� ���_�..� • ;,�,��,�` ; � . ��,.�. � � ����'I
' Varie ated leaf color li ❑tens sCed areas ;��-�,;,� � ,I ' , .� Long-lived Perennial ,� ,o �� Summer ❑ early Autumn
9 9 Y f�>c- K w*:�+����;�F � , --� NOTES.
� %�^��������' ,��� 4' �gC/5' �ide - maturity EXISTING LANDSCAPE PLANTING ❑ IRRIGATION SYSTEMS AT THIS SITE WILL BE REMOVED. ALL
:�� ` ;pk` /� .x: , � M.,� -�- � ' � ti•-,� ..s��, ,''�`%,,� Tulba I�a violacea
� �. - :� Loropetalum cC�nense 'Burgundy' ;.��. w- •``r'�.- � � g EXISTING TREES WILL NOT BE SALVAGED DUE TO POOR HEALTH AND/OR INCOMPATIBLE
a.,�� � .w ,!Fr.�'�f'- :. '�'k`..� ...y 1" '`�`'►A� a.`� - -' .,
j r =:. ' .' �!%,/' , Chinese Frin e Flower 4'� ' `'�;:� « :,f � �„ - �, �= ,. Society Garlic �
", r � :f �� �� ;� g ��., , t/ .�,tir'�i' -�� Minimal to Moderate ❑ater -:! � , ,� _ �� � LOCATION DUE TO PROPOSED SITE GRADING ❑ NEW DRAINAGE FACILITIES. READER S ATTENTION
'r�:�'+! �.� x' M �
�:i%,,, ,�s �.�; , ;` � ';�'� � .. : +�J•'' `-0 � ������i�; � ��I�`'r IS REFERRED TO THE ARBORIST REPORT (PREPARED BY CAKE MINNICK, ISA CERTIFIED ARBORIST
'' �- �.� � .�� ��•i Ever reen S�ub �'�~ -� ` 'y �� - l ���� � �� ,� � �� Perennial (from Rhizomes)
�::�.; ,;.� �`�;,,,,�,� �, 1 �: J ��'" , .f � ,; ,� �.�f � 2 ❑ide strap-s-aped leaves in varying � . , � ,� � ' � ��� �����-. #WE-11830A), ACCOMPANYING THIS SUBMITTAL FOR ADDITIONAL INFORMATION ABOUT EXISTING
�'•� i`� � ''� m ��`,�,''"`"'� ��`��� sCades of color, c�efl bronz red, cream ❑ � , ,, �, ����!� '� ��;L Pro ect Name
�,,•,,, �a,....... '-.:. , J , . � Y Y � � . ��'� , F „ _ TREE SPECIES ON SITE. I 1
�:.�"��` ::';• ,,�``?��: 4 � ❑/6 ❑ide max. C maturit takes � �� `, � � 1 ;� � , .� ���, P¢�; 18 C�g�C �ide _ maturity
,:.y^ . ,;N:S�:�-;•w,.;_4. 9 Y ( . = r .d� pink �/olive leaf edges 1� � �� r �.�1 I�!'7' �
�:�.�� � p g g � ` � \ �� ,,� �,, t, , j,, r� f�,,. Bank of America- Homestead Road
.� t '� ,,,�,�,� . :p runin ❑s❑earin � �ell � ,� �. � 4� � ��, �,�a ,.� � f, EXISTING SOILS SHALL BE AMENDED PRIOR TO PLANTING PER RECOMMENDATIONS FROM SOIL
�:,,h.�,�, E -- ` `�� M • Minimal to Moderate ❑ater
� �t� .�„�,��;��; V e r y t o u g❑�t o l e r a n t o f p o o r c o n d i t i o n s , �� � . , � N U T R I T I O N R E P O R T. S O I L S A M P L E S F R O M P L A N T E R A R E A S T O B E S U B M I T T E D T O A S O I L S L A B
�: ,,` `�� t,��, �� �: Regular ❑ater ' , � �;;'`,t���,.,� � FOR NUTRITIONAL ANALYSIS AND RECOMMENDATIONS.
'''���' ' ` - t „�� Cotoneaster dammeri 'Lo-fasY ' � ," � : '° �;,�`� i`� Y 9 9- p
��:- _ -+ v�.� e;,, ,��t�< ��N �;, i� s� s. ;, -
r Ver tou ❑, lon lived lant❑can survive
,�� ,�o��►�� � „%� �x � . � �?���°� i: '� '�` ;'.i', _it❑only occasional ❑ater Project Number
Bronze-purple foliage year roundC�usc�a ; y � �� Bearber Cotoneaster Groundcover .,,LL ,� �tf �
' ������g, ,, . fF�. , r > w � rY � ) ',tj �� ;�, � ALL NEW LANDSCAPED AREAS TO BE TOP-DRESSED WITH A 3 LAYER OF RECYCLED BARK
r,�s `��,1;, ,� ,�. � � �, .« i,,,,4�: _; �. �r , .t
,� , pink floCers in Spring, intermittently for rest � , ,> ; , ,�� ��- � :` � •�..,n , ��Z .� MULCH. NO PLASTIC SHEETING OR IMPERMEABLE SURFACING SHALL BE ALLOWED BENEATH
y '�� Pale lavender flo-ers year-round, Ceaviest Protot y
���;'� _ , of t�e year ;` �' : � �j ; � , , ; ' 9 ' �" '�il�' _�� BARK MULCH.
Ever reen Sa-ub �.� E���
� ��y `` "�`'� �j �' � �= in Spring and Summer. I ype�a out
�.r > <; ; ,,
�'�' �y ' � °� � z "" ��` � 1' �gC/ 10'❑spread ❑ maturity jd Y �� NEW LANDSCAPE PLANTING WILL BE IRRIGATED USING NETAFIM TECHLINE (DRIPLINE) ON AN
; ,� , � � ���A Nandina domestica 'Gulfstream' , ' F i � '#4� � `- ti. � ,;
� �� _�_;;� �I��;.;� _ ;�� ;; ��� � �' ,�f: �}-� ` � �����,�a,. �;�'�� AUTOMATICALLY OPERATED IRRIGATION SYSTEM. NEW TREES WILL BE IRRIGATED USING LOW I Description
� � , �� �; � �y.� HeavenlyBamboo ,:-� �,,��.,, �,��- ,�e,; �,�,;�; Minimal Cater ������ � ,�� �;
�� � .,� Y�'� � �,;k� � �*�����.�','� `b� �; ����'�� � ��x �� ��; ,.� � Clytostoma callistegioides FLOW BUBBLERS SET IN VERTICAL PERFORATED TUBES TO ENCOURAGE DEEPER ROOT GROWTH. PRELIMINARY LANDSCAPE PLAN
� ,. �_ � � �' � r � ;at'2aF ��
`� ��: ��� ;��> �� •��� Violet Trumpet Vine
� z ` f ^.�F_" nh � �,��" Evergreen S�-ub ;,. Y�y,i�"r �'{'�'S.w. ,$ �� � ; ,,�,��� ,; 4� r
:_� �� s,�, f ,�,{ � :�' Extremely tougq Cardy groundcoverC � i��„ ,�,��, ��,,:� NEW IRRIGATION SYSTEM WILL INCORPORATE AN AUTOMATIC IRRIGATION CONTROLLER WITH
r... �' ;^+ „u�.w �'$.;��, :s:.�. �,� �.�.'�'+: � � , < < ? ,r�t' S.� t,�, �t �•�e �'
� '< r �,� ''��' N �. � ,,: tP���' non-invasive variety of Cotoneaster r, ,_ ' ''�' `��t �;,� �;Y`.ry�<a
�w , , , ���`�y ;� w�r� �,-; ��,�z ;� �,, , Evergreen Vine WEATHER-SENSING CAPABILITY FOR OPTIMAL WATER SAVINGS.
-� ��c�,..-�r-� ,-��, ° : 3-1/2' �g��/ 1-1/2' �ide maturity . �M, N Y �y+�� '�,f�r. ' ��f� "� � a
�c,, 4�4 � ...-,a�7"' ; :� �.
..� ..,�4 N.�._,��c"r����y��'�jyw.:.�' Y��• ,' c � p ,s.4���.�.. � .h�d . a1' .� �,' � �, .-:
{ � .�;,b � ��t I Scale
,�, ,,:-,,� , �,.�E ,<--�k . �' f4��;.; ; ,�,;< Va,��F��9�'��;•Y Tiny ❑�te flo❑ers in Springa-ed berries in ����.F� , �,< ���xw��;���'� Stron ro❑in vine but easil ke t in c�eck ALL PLANT MATERIAL SELECTED FOR THIS SITE IS COMPATIBLE WITH NORMAL CLIMATIC
f =,=.�;s "tij��� " � �S ' Minimal to Moderate Cater �°a,::�.���;�e?'��s,:; F�-•� ti�� ��zt g g g y p AS SHOWN
��� a�, a �c =�`�;;f �1 1 , - late Fall �r,,� �a��;,�,� $'a�� -it❑occasional pruning. Runners can gro❑ CONDITIONS FOR SANTA CLARA COUNTY. NONE OF THE SELECTED PLANTS ARE REPORTED TO
".��-r`r�'� �ha �P�. �'s "':"� ' �r -
.�'� ��*.;�r��,�' �;�, �. � , .� � �������.� � ,1'�;;; 10' in a gro❑ing season. BE UNSUALLY SUSCEPTIBLE TO PEST INFESTATION, VIRUSES OR DISEASE.
��,��- � r ,: _ � �, ;., Small ��te flo❑ers in Spring, colored �
,� -s , G�
�,- a�' ' �
�� ,,f� ?� �t�;��; ��' _ foliage (red, yello❑, green)year round
� � ���' �,` ,�y�+�, � - a�,�� �����'` x �.��, Regular ❑ater PLANT MATERIAL SELECTED FOR THIS PRO�CT GENERALLY HAVE A LOW TO MODERATE WATER
i . �.�r'i+/ a,� ��-' �� �''� e t�� � r
'°`K�"`�'�� Eas care, extremel tou ❑ p'��; �,�''.� �'���` USE RATE. NO LAWN TURF OR HIGH-WATER USAGE PLANTS ARE PROPOSED FOR THIS SITE.
y y g � 1�������, ' �J ��,`' Violet and ite flo ers in Spring.
�, '�" " a.'�`�+'��\_ ■
�' ',�� Y�Y�� ���,.
4� �,• ; . . .
���� � . _
. ���
B n k f Am ri ��
.��
a o e ca �
� Homestead Road
- `�� �� �
� .�
, New Store
. , ; �
- -
- - _ _ _ _ _ � - - - - - - - - - - - - - - - - -
-
� __ � � �
, ,+ � � �
�� , - ��
� � ���
. - _ - � � 21020 Homestead Road
7 � '_ , 2 • ' ._ F � / _...
� � :
' L" ����� _ � __ - -'- -- 12"WIDE CONCRETE BAND Cupertino, CA 95014
� ��� � - - - -- - - -- - - - ` ( RA , ROOMED FINIS )
\ - - --� G Y B H
. . - � � � ;.�� � , �__ __,��- --- -- -- �_ � __ -�,_
.
�. - _ _ ���„
� . , � � �, � � � �r ���,��, �>
_ . . , �� � � .
1= =- �. ��:� -- � .� � , I SEATWALLPER = �'��' �� SERIAL NUMBER. CA
- -, � I �- i i:'��,/T�i �L �
� _- _ , , aRCHiTECTURa� � ���� � � � NRSP VERSION: 2.0
�- ' �� � � DETAILS _ �� '�"� _ --�, � �
,�� - -� _� `�� ;��� BULLETIN: 2017-2
v _ _ __ _ _� �� ��� ��� � �
,� ��� '�� � ��
,�
� ' T���`,4 r���
' ��'?��� ���
' ���� '����� ���
�� / '\ - 2101 Webster Street
I� � .
���� ��� �`� 'F %��, � Suite 2000
� � �/� �'� � � Oakland CA 94612
,
� � �i � �` �� Tele hone 510.625.7400
T � �� Gensler p
� CONRETE UNIT PAVERS: �� ������ � � �!� �r� � Facsimile 510.625.7499
� "CITY STONE COMBO" � ��
i -
BY PAVESTONE
/T� Landscape Architecture:
. � � % � �'�
_ � / � �/�'-�h,
�
- a� _ ' � � - - - '�� ,���"� Pa vement Engineering lnc.
- � �
�� .
"CITY STONE COMBO" BY PAVESTONE. Available in a variety of finishes, this paver combo brings scale and dimension to architectural settings. City StoneT"' can be used' I /'� ', YOU Cal7 /"lCJ�E Ol7 OUl"l"epUtat1017
I / - � or r t �
alone or in combination modules of s mmetrical s uares and rectan ular sha es to create extraordinar atterns and endless desi ns. This avin attern combines the 6"x12" 10'TALL FREE-STANDING C po a e O ce.•
y p g p y p g p g p � �/ � • 3485 Sacramento Drive, Suite A
City Stone Rectangle, the 12"x12" City Stone Square, and the 6"x9" City Stone Rectangle. I TRELLIS: ECO-MESH PANELS p ^ A��` O� ^ n n C p I� n _ �
BY McNICHOLS CORP. ��'11 V f\ �'11V1 C f< <'1 I San Luis Obispo, CA 93409-6095
805-78 9-2265
I I i
I � � � i
I SEATWALL PER I
ARCHITECTURAL Pa�ment En�{neerin�Inc.
DETAILS � Attn: �nathan Edholm,Pro�ect Manal �r
� i � 3�0 CCpress ❑riC�, Suite 3
� COLORED CONCRETE (BUFF TAN, DAVIS � � � Petaluma,CA 94954
COLOR 375), BROOMED FINISH, W/TOOLED � T: 707-769-5330
THE WFORMATION CONTAINE�INTHIS�RAWING IS THESOLE PROPERTYOF 115.FOl1N�RY&MANl1FACTl1RING CORP.ANY REPRO�l1CTI0N IN PART ° � � E-llltlll: �Il�ltll�llle❑y1�LC�'111eI1YP.11�IlePiY117. ICOYlI
ORASA WHOLE WITHOl1TTHE WRITTEN PERMISSION OF ll.S.FOl1N�RY&MANl1FACTl1RING CORP.IS PROHIBITE�.II.S.FOl1N�RY&MANl1FACTl1RING �INTS SPACED ❑ �2 O.C. �TYP.� Y
CORP.RESERVES THE RIGHT TO MRKEMO�IFlCRTIONS TO�ESIGN WITHOl1T PRIOR NOTICE.�RAWMG IS 11NGbNTROLLE�WHEN PRIME�.WEIGH7S I , �
AN��IMENSIONS ARE PROVI�E�FOR REFERENCE ONLY C92014 US FOUNDRY AN ERGLE MANUFRCTURING COMPANY �
� Landscape Architect: Mike Wasden
4� STANDARD GRAY CONCRETE � License: CA I 4669 EI �. 10131�O1 I
A i PANEL, BROOMED FINISH (TYP.) � I
i
10' TALL FREE-STANDING �
i
r� /� � � �,� TRELLIS: ECO-MESH PANELS — ��'y� 12" WIDE STD. GRAY
I �`�/�� � �\\����� I i BY McNICHOLS CORP.
� � � 24 � — � BROOMED FINRSH
� /� � � -� — I i
�!�% � I
'�/�!� �
'�/ � � � i _ _..... ___.._ _ ___ .... I
0 0 �
� � , I ,
� � A �p � 1 1 2 \ ��I�, \��I i,,- — �
�� II �� I i i 12"WIDE STD. GRAY y y ���I��\\ y y ��'I`�\ �
��� I � �2� � I CONCRETE STRIP, �
WL 4S ��8 I BROOMED FINISH
i I
���� �I'1J� 1 1/2 I � i
u u�� I
aO 0 0 � I I � Issue Date&Issue Description By Check
O D ' i! i 01 5/26/17 MPW MPW
O D
24 � �� �� r� I� No � I
� o � � � ��., "�_ _ _ _ _ _ _ _ _ _ _ _ _ _� _ _ _ _ _ _ _. _� � � � � � PARK�N� ' �, !���� Pre-Planning Submittal
� � 0 � ' �� �� � ; - - 02 10/11/17 MPW MPW
� � � � � i , �
� � � � � � i Planning Submittal#2
� � � � � � � �
� � � � � O US FOUNDRY TREE GRATE
0 � � � � � � �
O� � 0 OOOOO i (MODEL 9501)-ADA COMPLIANT � �
� C O N R E T E U N I T P A V E R S: � �
I "CITY STONE COMBO" � � �
� assi Nw 9srd srreer BY PAVESTONE I I
�� Medley,FL,33166-2025 � I
48 � U S FO U N D R Y Phax 30�5-887-9429 ' ', '
1/4 �� www.usfoundry com � I
,\ AN EAGLE MANl1FACTU0.ING COMPANY �O z014 All Rights Reserved I � � �
TYP. i — , �
�/2
23 5�8 USF 9501 TREE GRATE � I ,
�� TYP ADA Complaint
LOAD CLASSIFICATION: L I h t D U t I
� � �
° ° �n�Ria�: ASTM-A48 GRAY IRON CLASS 35B = - - - - - -
scuF: � -
���_��� I
32 ree Grate No 8070272 I I I
� o3—a�-11 I '
u�s , , I
� � �
REV: Q �ATE: REY BY: QUOTE� I
I
I / � � i I
US FOUNDRY-ADA COMPLIANT TREE GRATE (MODEL 9501). Cast iron tree grate, 48" s�uare, ADA compliant for C ialking surfaces. I �
I
I _ _ I
I �
� � - - _—„�-- , �—, —,— —:: :—:: - � I
� , � � ��� � _ , � _ _ _ �
� I�\
� I�
3"x3" STEEL POST ❑ 4'-6" O.C. \�� �
(TYP.) �I
STEEL MESH PANEL: ECO-MESH I
BY McNICHOLS CORP�}'WIDE x
8'TALL, DARK GREEN �
� DECORATIVE SURFACE TREATMENTS ISeal/Signature
,
a0 1"❑10'
NORTH
,��
CLOSE UP
��.,�,, ,..��,.�,a��o,«.F,, Project Name
Bank of America- Homestead Road
ECO-MESHO Screens are made with a heavy 0.12 woven wire mesh screen with a unique bridge wire for stabilization. This gauge is 2-1/2 times stronger than .080 wire found in
competing products. Our special intercrimp ❑eave provides t❑e flexibility plant screens reCuire and eliminates broken �elds t�at can occur in ot❑er brands.
IProject Number
ECO-MESHO screens are framed on four sides by durable 16 gauge metal channel which is 25°/o heavier than 18 gauge frame commonly found in other products.
IPrototype Layout
IDescription
DECORATIVE SURFACE TREAMENTS
I Scale
AS SHOWN
375 Buff Tan
DAVIS Concrete color#375, Buff Tan
■
/� I;UK� '��
■ ''SEE PG&E DRAWINGS i / o , „ RADIUS: 40.� Ba n k of Am e ri ca
FOR CONTINUATION� S 8 9 4 7 0 0 E 1 2 9.6 3 A R C L E N G T F �
\ I CHORD LENGTH: 56.�,
— — � — — I — — — — — — — — — — — — — �;unRn R�oQinir,� cn�
_ \ D1 COORDINATE REMOV�ALMWITH PG&EREMOVED. HO111�S 1.��� RO��
� — — — — — — — — — — — — � \
\ � I NEW UCD VAULT FOR UNDERGROUND UTILITY TRANSFORMER. + 1�-
� � \ � � � � \ O WITH TRAFFIC-RATED COVER AND ASSEMBLY, VERIFY WITH PG&E DRAWINGS. N�W S l.Ol �
\ \ /
\ i \ � _
\ \
� , � ` � 21020 Homestead Road
' , � � � Cu ertino, CA 9 5 014
� 2 X2o � i p
i ` ,
EMEN F
ACIFIC B LL � \
I
� � SERIAL NUMBER: CA
�
i - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - � � �
1 � i � � NRSP VERSION: 2.0
i i BULLETIN: 2017-2
I TOR. � �
I �
4" CONDUIT � UCR 4 UCR 3 UCR 2 � � �
PRIMARY FEEDERS I ME UCR 6 UCR 5 SBB HL FSA UCR 1 � � � �
I
_ � I
� AISLE I
2101 Webster Street
�� I � 0 SITE Suite 2000
��—� WO N O REC CLIN Oakland,CA 94612
� - �- - - , ensler
L I �I I I � Telephone: 510.625.7413
D � � 5 I � FEc WAITING Central Zone � Facsimile: 510.625.7499
� I I ° I
I I � I
3 I 1 i BREAK RM. � � � �� I �
+ _ ' O O UCR 7 � I
I I J.C. �
� I
PG&E CLEARANCE AROUND � � I
UCD VAULT � I — � , � Nb
5" COND�UIT � i �� � � � I � I
SECONDARY FEED�RS _ _ � _ J I
� - - - - - -F� ER � I �
� I- � �
CALLING �
NEW 400A, 208/120V,
° CUBES �
3PH, 4W SERVICE - - - - - - - - - - - ° ° �
I A � �
� I I
I �
I �
� i I � Issue Date&Issue Description By Check
�
I woR RM. i � � ` 01 08/24/2017
� TELLER PLANNING COMMENTS
I � � � .
i � � G
L o 0 0 ❑ ❑ ^
r
PROPOSED BANK of AMERICA BRANCH BANK ' , r
� � -
-
C
° G
❑ S° � i �
9 , �
► �
WM (.
FDC
LEAN LEAN LEAN � � '' �""''
C C C � � I
AIR AIR AIR
VEHICLE VEHICLE VEHICLE ( I I
� �
� I �
�
�
PROPOSED PARKING � -
N
� O
W �
M N
Q� I O
� I O
I I �
��
RECOLOGY
TRASH
BINS
�
❑ I I
SD
13
� ,
� - - � � �
I I
D1 I I
L — — J
�� � �
�,,,,�,��,,,,�„�, .,,, .,,— + — — — — — — — — — � �
I Seal/Signature
�
�
\ \ �,,�'QRpFESS/p�
� ACIES , N ��--
N682�, ��,'�`��``���'S° <FFF�c;
SS„��� ENGINEERING ���, y;
3371 Olcott Street � W �;
Santa Clara,CA 95054 �� No.E015418 � ;
; Exp. 06/30/19 ��
ELECTRICAL SITE PLAN SHEET KEYED NOTES ph:(408)522-5255 ;� *,,
fx:(408)522-5260 � J, c� � �`
info@acies.net '=�qT�FCTR�GP���P�'�
Copyright�c 2017 _FOF CA��F��'�
"'�-�,......���
BUILDING COMMISSIONING 1. CONTRACTOR PROPOSING TO UNDERTAKE WORK UNDER THIS DIVISION SHALL VISIT THE SITE I Project Name
OF THE WORK AND FULLY INFORM THEMSELVES OF ALL CONDITIONS THAT EFFECT THE WORK
A. TESTING AND ADJUSTING - TESTING AND ADJUSTING OF SYSTEMS SHALL BE PERFORMED iN ACCORDANCE AND COST THEREOF, AND ExAMiNE THE DRAWiNGS AND SPECiFiCATiONS AS RELATED TO THE Bank of America - Homestead Road
WITH INDUSTRY BEST PRACTICES AND APPLICABLE STANDARDS OF EACH SYSTEM AS DETERMINED BY THE SITE CONDITIONS.
BUILDING OFFICIAL. PROVIDE A FINAL REPORT OF TESTING SIGNED BY THE INDIVIDUAL RESPONSIBLE FOR
PERFORMING THESE SERVICES. 2. CONSIDERATION WILL NOT BE GRANTED FOR ANY ALLEGED MISUNDERSTANDINGS OF THE
AMOUNT OF WORK TO BE PERFORMED. TENDER OF PROPOSAL SHALL CONVEY FULL I Prototype Layout
B. OPERATION AND MAINTENANCE (0&M) MANUAL - PROVIDE THE BUILDING OWNER OR REPRESENTATIVE WITH AGREEMENT TO THE ITEMS AND CONDITIONS INDICATED ON THE DRAWINGS. SHOULD THE
DETAILED OPERATING AND MAINTENANCE INSTRUCTIONS AND COPIES OF GUARANTIES/WARRANTIES FOR EACH CONTRACTOR FIND DISCREPANCIES OR OMISSIONS IN THE CONTRACT DOCUMENTS OR BE IN MEDIUM
SYSTEM. 0&M INSTRUCTIONS SHALL BE CONSISTENT WITH OSHA REQUIREMENTS IN CCR, TITLE 8, SECTION DOUBT AS TO THE INTENT�THEREOF, HE SHALL IMMEDIATELY OBTAIN CLARIFICATION FROM THE I CAD File Name
5142, AND OTHER RELATED REGULATIONS. ENGINEER AND/OR OWNER S REPRESENTATIVE PRIOR TO SUBMITTING HIS PROPOSAL FOR
WORK.
C. INSPECTIONS AND REPORTS - INCLUDE A COPY OF ALL INSPECTIONS, VERIFICATIONS, AND REPORTS, REQUIRED 3. FIELD VERIFY EXACT NAMEPLATE DATA ON ALL EQUIPMENT FURNISHED UNDER OTHER I Description
BY THE ENFORCING AGENCY, DIVISIONS AND/OR BY THE TENANT (I.E. HVAC EQUIPMENT, KITCHEN EQUIPMENT, COMPUTER SHEET INDEX & SITE PLAN
EQUIPMENT, ETC...) PRIOR TO THE INSTALLATION OF ELECTRICAL WORK AND MAKE ANY
ADJUSTMENTS TO OUTLETS, CONDUITS, WIRE AND/OR CIRCUIT BREAKER AS REQUESTED TO
MATCH EQUIPMENT ACTUALLY FURNISHED.
I Scale
4. REFER TO SPECIFICATIONS SECTION 16110 FOR UNDERGROUND CONDUIT REQUIREMENT.
5. ALL CONDUCTORS SHALL BE COPPER, CONDUCTORS FOR ABOVE GROUND SERVICE SHALL BE
THHN – THWN. CONDUCTORS FOR BELOW GRADE SERVICE SHALL BE THW OR XHHW. O 2� 4' $� 16'
CONDUCTOR #10 AND SMALLER SHALL BE SOLID, CONDUCTORS #8 AND LARGER SHALL BE
STRANDED.
E-0.0 SHEET INDEX & SITE PLAN
EP-1.0 SITE PHOTOMETRIC E�
EP-1.1 SITE PHOTOMETRIC CUTSHEETS �
Ref, North
CALGREEN BUILDING CODE REQUIREMENTS SHEET GENERAL NOTES SHEET INDEX
a� �
c
o,y O p
°' O
DATE OF FIELD SURVEY �� N U
DATUM STATEMENT BASIS OF BEARINGS � � � -
� � � o
APRIL 15, 2017 THE BASIS OF BEARINGS FOR THIS MAP IS THE MONUMENT LINE OF ��� N �
COORDINATES SHOWN ARE BASED ON CALIFORNIA STATE PLANE NORTH AMERICAN DATUM (NAD83)
' ALL MEASURED DISTANCES SHOWN ARE US SURVEY FOOT GRID DISTANCES C H E R R Y S T R E E T, A N D T A K E N A S N O R T H 8 9 0 8 1 4 W E S T, F R O M F O U N D =_ �o �
S U RV EYO R S STAT E M E NT ZONE III, (EPOCH 2O11.00). � MONUMENT POINT 106. "' � � c� �
UNLESS OTHERWISE NOTED. TO OBTAIN GROUND DISTANCES DIVIDE GRID DISTANCES BY A COMBINATION o � ,
THIS MAP WAS PREPARED BY ME, OR UNDER MY DIRECTION, IN CONFORMANCE WITH THE FACTOR OF 1.000067014 J � � �
PROFESSIONAL LAND SURVEYORS ACT. R E F R E N C E 1�T �, J o Q �
1�1 � �U �
20' io' o' 20' 40' 0 167 ROS 23 � U � �
BOOK 167 MAP 23 �
GRAPHIC SCALE: 1 INCH = 20 FT .� 0 O �
� O p N
c� � NU �
J. MAY, PLS 8570
03/31/2019
SURVEY CONTROL
HOMESTEAD ROAD (90' WIDE) POINT# DESCRIPTION ELEVATION NORTHING EASTING
� - , _ + _ 100 CUT X 223.45 1949002.90 6113486.80
- - - - - - - _ _ 101 CUT X 220.25 1948631.90 6113585.18
- - - - - - - _ �os
ST BM 102 X ON CURB 224.10 1948877.97 6113499.61
I103 N/S 224.82 1948905.68 6113388.97 V
J
I � J
104 N&S 224.57 1949017.31 6113392.50 �
ELECTRIC CABINET .,
DETECTOR Tc s Tc 105 CITY BM 16 223.26 1948987.20 6113502.82 � a
N
- - _ _ _ _ _ F� F�5S 2� 224.95' PG&E 224.69' BW S TC GB TC a ��
, - - ,_ TC 224.42 223.82' , C Z
225.42 , , VAULT Tc Tc Tc 223.50 106 ST BM 222.53 1949062.34 6113548.77 z a
224.67 224,2g� TC S 224.26' 224.13� TC ESC DETECTOR
225g9 + 224.57' 223.so' I 1002 FND ST MON 227.10 1949069.73 6113057.90 m OWU
BW E ,�j 2�O
225.s3' ' DRIVEWA , , „ 1003 FND ST MON 228.15 1949074.31 6112727.08 � > NZ
Tc E �' BW E TC GB CROSS WALK BUTTON V � =WF"
2 2 4.9 9' FD PIN �►� .�- TC S + 24.67' T C 224. 223.42' � H��
BW S 224.22' + 225.� � , . N&s �29•1� 22 • + � 5019 FD RCE 10007 223.14 1948848.34 6113499.53 � v� 30 W
� + 225.4' 24.70 224.87 224.7'
2 2 5.5 1 a + 2 2 5. ' TC� � + 22 73' L A W N + 224.8' B T� � � �_�
� + 224.2'
22 .39
c`�i'� 225.2' + 2 2 4.9 2' 25 ' 24" DEqDUOUS 225.5' + 2 2 5.9' 222.9TC O �QU
+ 225.9 ��� I » DL 15' � BW + 224.7' 2 2.86' � N
J �2 D E q D U W 24" DEqDUWS �u 223•6$' p .�' TC GB LEGEND ABBREVIATION o p 0
PACBELL EASE F` � DL 15' �°9��O 223•2�� I W
DOC N0. 13789176 � 7c +�2 4.97' ��,0. .o ZN
225.38 + 224.8 '225.42' 7c 2 ��o�- 22�0o T� ELECTROLIER WITH ARM AC ASPHALT
AT&T UNDERGROUND �
CABLE BOX W/CONC. 224 95.57 �-�p3 BW cuT x C23'2� DI 122
PLATFORM 224.7s' . 223.22' GRATE EL. = 223.22 ❑"" WATER METER TC TOP OF CURB
Q 223.39 + 224.1' 122 INV. EL. = 219.42
INV. 12" RCP IN (SW) = 219.62
Tc Y BUILDING OVERHAN BW „ TREE
24M PALM � a 2 43' I INV. 24 RCP OUT (NE) = 218.92 '
DL 5' '-� � o FL FLOW LINE
N BUILDING B ESC � 7c ssc
225 2� + 224.6 ' + 224.51' Z FF=225.69 2 .43' ¢ 223•2�� � FIRE DEPARTMENT CONNECTION
�B +224'2� � + 224. ' o � GB GRADE BREAK N
+ 225.4' __ �
Tc T Y P. I T} 2 2 4.4 3� 2 . P A R C E L B LAWN"'y � °°P' P O S T I N D I C A T O R V A L V E CONC. CONCRETE L �
225.23 �
TC 225.58' o O �
225.24� 16 7 R 0 S 2 3 + 2 � �' ELECTROLIER Z
24� PALM I SSC START SMOOTH CURVE Y � o
DL 5 TC
Q p U
O � �
225•2�� 223.89' GAS SERVICE + 2 .9' ESC END SMOOTH CURVE /� M o }
`�' CATCH BASIN ^ N; _
� o + 2 4 22a.00' BUILDING OVERHANG Bw � o ^ W
223.50 T � � � � � J
, o o TCE W � NWY
8 C H A I N L I NK FENCE � 225.5�' � �`� GAS METER �
o AC PAVEMENT 7c E Z
5.6 � o o Y 4" D E C I D U O U S I (/� S START �� W a �
DI 275 + � 2 2 5.5 3' 2 2 5. � OL 10' � � � _
rc' +• 5 �22 . rc �I E END � }
GRATE EL. = 223.49 . , O SANITARY SEWER CLEANOUT
225.15 ��12' 2 . + 224.20' 4. ' OOR 223.43� �
INV. EL. = 220.69 so TC � CONC. W Y g
INV. 6" RCP OUT (E) = 221.64 225,�2 ��� 224 00'4 TC ESC �Z 225 �"' � g23 5�, � Z � ■� M
Tc TRAFFIC SIGNAL LIGHT �
TC TC SS 25.01' �n � TC BG WALK a �
225.17' TC 225.4 ' 10 225.56 � a225.28' � �
225.12� N/ 225.49 y T� TC S W
4.00' \ PARKING LOT 224.01' Q TC S223•��� � �w �
� WATER VALVE
+ 225.8' TC SSC � + 224•92 S0 + 224.67' + 224.54' + 224.45' + 224.3 w 223'S9 O
Tc 225.13� + 224.17' AC��IENT � I I �
225.29� + 224.23' �
24• pq� 224.51' \ � � + � UNKNOWN VAULT �
TC ESC E T TC
DL 5� 224.5 ' 4.10� TC S � 102 �� p N
225.16� + 224.39' + 224.84' + 224.73' + 224.33' 223.72 �
DUMPSTER AREA \ 224.00' FL S X ON CURB N � � z
CINDER BRI K WA L + 22� , 223.ss� � SIGN � a w
24' DEqDUOUS TC T� 4pp TC S � � II � � V
DL 20' 225. ' 22 11� T w�8 223.78' � O � X
_r, TC E c 224$ �� Tc E � O TOWILL CONTROL
ELECTRIC CABINET 225.01' 225•4� 224.95' 225'� Tc p� � 224.13' �
TC 224.59' 2 4.87' 224 5' F L E �
2 Tc 223'68� � �+ FIRE HYDRANT �
' r' 2 2 4.8 7 �6" 1REE 224. 4� I
VICINITY MAP " $9�4'o E ,
2 2 .4 1' TC 1 3 4.1 8 2 2 5.0 6' 8" 1REE � � + 224.5' 2 2 3 6 5' J W
�•�,:�.,�-r , t . ; }�' �:� � ,---r-T , �,-.---�� � � � 10' TREE . 15 1REE I
��``?'��;. , �t � "` l� s!`�i� �� "'`":.�"' '�• `- �� �' + 225.8' 225.43 DL 1' DL 1 � ' „ , 5019 Q � � Q
����' `��' °'`'�"` '�' ' 36" DEqDUOUS + 22s.2' + 225.8' ?8g3, DL 1 FD RCE 10007 T R A F F I C S I G N A L N ¢o N � o
� �� �.a' `� � �;��' _ 1� ..�'� �' `s�. �. ��1� ELECTROLIE
�'-�'`' `i '�����"F . � - � ��� ��y' � �� �{� � - �'�"!� DL 20' 8' C ON ' R 225.7' + .2'
�: �' ��'� ��'�'�-�s---.� `�� ��,� „� j �: � � ' " � �'��'�rr� . �������;, HAINLINK FENCE 24 CONC.
� �
TELEPHONE VAULT �
� �������`�-:�'�'`� . r =�i�;�r� i� _'��-�r��r��, �-;y j. L �� BASE +
�..:* �4+� ` 1�; PROJECT � -'��`��,. = �` � a '�.r� '� '. '
y ~��'-'lti'�,�l�f � SITE � �i �� ;...,���J'�fa6� jE x' a. � �, � TC. $ 0
�'r` * r+ 'r�=1 r �..i�� � � � 1� rF�'1 :`.il� n�, 1..� 223.67�' I
I4� .. �1� k*�s.:fl� �_� � :������ r �,... �'�6y�!}:�4"�4 y}�r.� �� pI
'• '� a
�r�..�. .- ���� . �+� ' ��,��a i ❑
,�.. � , GAS METER m
°� `' » ��-� ���-��� '� 1�, `�``����',ti ����, �,= .�F����� DI 1058
�4,sm,,,'"�:� e;•�"'' �" �� � 4� ����11f- +'- = 3�s��!� - -
.
� I �J.aw � ;I F���,_,..j -r� '�� F�-::.
; ,.� � t� � , i ^ .� ��. �� �= w GRATE EL. - 223.71
r,l; : •"i-.`'� , • r ''� '' ' !
r_ ��.,�
, -. . �ri Y_� � .�: . P A R C E L A �N�. E�. = 220.�, � GAS VALVE
�`�'������,-� ,�-'; ' E��, � .�� ��'-:;-- �.�- CUPERTINO �� _ I I
� - ..`�. � A :�`„ ` 'r�,�; °#,��=�' i t'�',�-;`� ,�,,;,r..�„ INV. 6 RCP IN (W) - 220.74 I
- �1�";"�: ��. �. �;j�-� w �-:- � -, � � INV. 6" RCP OUT (N) - 220.69
��-.��, .. �- , _� ,F� .,,-� ; �,? � �� 167 R0S 23
, -�?��', 11 ±� ����� '�i-,' ����kl���,� ��� �!� �' � ,:�, - o° CURB RAMP
. .-�, • .
,�
:'i. .r� _ �.. li I �� '-��,..�. `. _:`���iF'�'i�`albnr�i+a_Ti_tA1'3N5�:`��s��,i�"��=�
----- - . � ��. - --- - . �� .� =2r.-7f�'.��
. _ � .-. � . _. . ..- - � �
/� � . .. . . _ - W/P M
- �, �, :;� �;�, "�r�� r � ������ -� UNDERGROUND WATER PAINT MARK Z
��p,�lt,�'A� � '��, � ` ��� � =,
'��V+r�t. _��:,ili�,'y��,-In�d�'Ai!"te►t�'l��,��_�a,i- °i 6 ���'�.i� �
N
I I G/PM UNDERGROUND GAS PAINT MARK W
�
I �� ^ ��- FENCE
� �
I I w
So So UNDERGROUND STORM DRAIN PAINT MARK Q � m �
N �
w � z �
�
I � N � O �A
O
� � SHEET �
OF 1
. ���
B nk f m i ��
a o A er ca
I
Homestead Road
New Store
21020 Homestead Road
Cupertino, CA 95014
SERIAL NUMBER: CA
NRSP VERSION: 2.0
BULLETIN: 2017-2
24'-0"MIN. r
MATCH MATCH � � EXISTING CITY STREET � I
��224.9osw 224.12FL 224.00F[ LIGHT, TO REMAIN � z RELOCATE 1 B TRAFFIC 2101 Webster Street
� � rn Suite 2000
_ m SIGNAL POLE
� � - - -- - -_ - - - - - - - - - - - - - - - - - - - - - - - - i Oakland, CA 94612
� � 0 � '� �s� - - - - - - - - - - � i Telephone 510.625.7400
\I . .
� _ o , „ � Ts ����I�� Facsimile 510.625.7499
> � - - - -- - - S 8 9 4 7 0 0 E 1 2 9.6 3 � �
- � - - - - - - - -
o - - - - - - - -- - - -- - - -- - - - - - -- - - -- - - -- - - -- - - --� �
� I
- - - - - - -�- - - - � -�- - - - -- - \
� Civ11:
� MATCH � i � - -- -- -- -- -� _� _ �
225.30EG
\ / � � � �� � � � TYPE A CURB RAMP
� ��_� � \ �
; , ' '� �' � ROUND�EXIST�N� c�Y������ � \ -- Pavement Engineering /nc.
_-
- , �
;:� � X � I sTREET �i�HT \ \ \ 222.84SW F� You can ride on our reputation
' ` \ 219.341NV IN
\ I i � I � \ � Corpo�ate Office.�
� ----- ,, 222.85SW/FL 223.51 TG
I � \ � � � � 213.51/NV OU7 • 3485 Sacramento Drive, Suite A
� � / \ � \ � soa;�H San Luis Obispo, CA 93401-6015
�
�v h�� LLLI�I I'.� \ � \ 805-789-2265
� ,��EMENT FOR �` I � 225.77TC ' ' ��� `
\ I 225.27EP NEW \ �
\ �IFIC BELL _ _�� 224.98TP �EW MONUMENT � -
- - --
� =WER SIGN � \ Pavement Engineering Inc.
225.70TC JLRVICE 223.31SW CONNECT TO CITY Attn: Jonathan Edholm Pro ect Mana er
.
� 225.92TC � 225.28EP � � �. � -_ � � � J g
� � ^ 225.57TC � �-------------------------------------------------------- ----- � STORM DRAIN 3820 Cypress Drive, Suite 3
�
225.50EP �
� � � � 5 � MANHOLE Petaluma,CA 94954
� � ��� PROTECT IN PLACE ' � �
� EX. TRANSFORMER PAD � \ T: 707-769-5330
I � � E-mail:jonathane@pavementengineering.com
� 5� �
� T � • • � Engineer of Record: Joseph L.Ririe,P.E.
' �O� • � • EXISTING TRAFFIC License: CA 52735 Exp. 12/31/2018
I • - • � � SIGNAL, TO REMAIN
• • � i
i • �
` • • • 1
• • �
� 224.°45W � �� •�, C.3 AREA CALCULATIONS
� � , � .
� JUNCTION BOX � � TOTAL PROPOSED IMPERVIOUS SURFACE AREA : 14,595 SF
I • I PROPOSED PERMEABLE PAVERS AREA: 1135 SF
� • � i i ��18 PERCENTAGE OF CATCHMENT AREA : 7.8%
. i
i � � i
I • I I I -
� �Nb'
� 224.50SW • � �
NEW 225.69FF • � � �
I _�cCTRICAL_ ___ _ . . �P � I LEGEND
� � S E RVI C E 224.50SW 224.50SW I
� O� 225.69FF �
i i AREA OF BIORETENTION BASIN
I � i
NEW 224.81SW � I • • • • • • ACCESSIBLE PATH OF TRAVEL I � Issue Date&Issue Description By Check
TEL/DATf, 224.31EP __Y_____ � I � 01 5/25/2017 JRE MPW
� --------- I
i SERVICE . �
I � � I EG EXISTING GRADE Planning Review
225.30SW EP ' OVERFLOW DRAIN W/STORMTEK I EP EDGE OF PAVEMENT
i � ST3G INSERT (FULL CAPTURE DEVISE) & BIKE �
I � � "NO DUMPING - FLOWS TO CREEK" PARKING (4) � � �I I ' FL FLOW LINE
� TREE WELL W/ADA METAL MEDALLION CURB RAMP � JUNCTION BOX I�
i CURB RAMP � �
FG FINISH GRADE
� � COMPLIANT GRATE 224.5osW _" I � ' (/
(TYP.) 225.69FF � °I I '! �
I � • r�-�� I R SW SIDEWALK SURFACE
• • • �
• � f--- -----_ -�
� � • • • • • � � � � � TC TOP OF CURB
'� 24"x 3" RECTANGULAR •• • • • • • • • • • • • 224.03SW 224.03SW � �P � � �
I DRAIN UNDER SIDEWALK • 223.53PCC 223.53PCC • ' ' I �
� � � • I C XXX.XX DESIGN ELEVATION
i FLOW � • I i G XXX.XX EXIST. ELEVATION
I 225J9TC � 224.32SW 224.19SW • 224.46PCC �
225.29EP 223.82FL • 223.69PCC / 223.80PCC 223.91SW PCC � 224.04PCC � �
I ' - BOLLARD I I C
�
• �
� � j (] 223.37TP (TYP.) ° • N � �
M �i � � � ..! � � 12'-0�� • g�_��� M � �
� � � /� � 9�-O�� i • - / FDC �� - -
� � � H So P� �� � - --
_ ����-��� • D4 �i
o `I • �/ TYP. � �
. T
M � . ,�AN, � �i
� �
� 223.99SW EP FL � � � I � �
�� ��� CLEAN , CLEAN � �
0
I �� No � I � � MATCH
� � AIR AIR �
� � ic �EHic�E / � P�RK�N� � i 223.12FL
I - - �
0 • f
� F�' � • 224.05PCC EP 224.22PCC EP 223.67SW EP i � 223.60SW �
I � • CONCRETE PAD 223.59SW
i
• PERMEABLE PAVERS I I
� • � W/UNDERLYING PERFORATED i
� FLUSH SIDEWALK • � PIPE CATCHMENT SYSTEM ,� � � I
,I BOLLARD • � JUNCTION BOX ► � I z
(TYP.) � � � I`� I �
� 225J3TC � � � � � I �w �
� 225.23EP • � � I o N
I � � • CONCRETE CROSS WALK � o II
• NEW TRASH ENCLOSURE SPEED BUMP � I�
i • � & CONCRETE PAD I
I �• • • • • • • • (TYP.) � 224.04SW I
' I • �O 223.59SW EP I 223.70SW
IRECOLOGY
TRASH � �
� � ' OS� � � MATCH
I
��. � ' 223.56FL
I i I
I �-_', � �
REMOVE & REPLACE � �� � � � � , � � '
DUMPSTER PAD Seal/Signature
/
225.53TC 225.55TC I '
� � 225.03EP 225.05EP i � � ��'
�- - - , � � / � � �' I � ,�,
� MATCH MATCH � ��
� �226.14EG - - 225.51 TC
� II
� � 225.O1EP � �
- - - - - -- - -„ -- - - -- - - -- - - -- - - -- - - -- - - -- - - -- - - � ��
�� � �
EXISTING TRANSFORMER TO BE
REPLACED WITH UNDERGROUND UNIT `��� 224.32SW I � �
�\24.32EG i �
N68° \� I Project Name
2�SS�2693- Bank of America- Homestead Road
��I
� I Project Number
�
Prototype Layout
�'-0 I Description
y
� '. EXTERIOR SITE IMPROVEMENTS
FULL SITE PLAN IScale
1"=10' AS SHOWN
■
OO 2015 Gensler
Attachment 4
Ellen Yau (page i of 3)
From: Celia Watson <celia.watson@mac.com>
Sent: Wednesday, October 18, 2017 7:49 PM
To: City of Cupertino Planning Dept.
Subject: Development Proposal at 21020 Homestead Rd, Cupertino 95014
Hello,
I have recently seen this notice of proposed development and have to ask WHY?
WHY, WHY, WHY?
Why is another Bank of America branch necessary?
With the trend to online banking and mobile payments surely another bank branch will be obsolete in just a few
years. And then the question will be what do we do with this empty bank building?
As the notice states it is to replace an existing multi-tenant commercial building. It is not an empty building. It
is occupied by businesses, some who have been there many years, serving the community in a myriad of ways;
a community trending to banking online!
The area is busy with traffic. If street or parking lot improvements are necessary, improve it, but not to the
detriment of current businesses.
Does landscaping include the addition of shrubs or trees? Why remove 14?
Does Cupertino really need another plaza?
If another bank branch is a necessity would it not be better placed, and served in a location that can easily be
approached on foot such as a shopping mall.
Thank you for considering these comments.
Kind Regards,
Celia Watson
Total Control Panel Lo�in
To:planning�a cupertino.org Message Score: l High(60):
From:celia.watson@maacom My Spam Blocldng Level:High Medium(75):
Low(90):
Block this sender
Block mac.com
This message was delivered because the content filter score did not exceed your filter level.
1
Attachment 4
Ellen Yau (page 2 of 3)
From: Joyce Clark <joyceclark27@yahoo.com>
Sent: Wednesday, October 18, 2017 8:55 PM
To: City of Cupertino Planning Dept.
Subject: Application No. ASA-2017-05; TR-2017-3g
Regarding the property at 21020 Homestead Rd. where the hair salon, Happy Cuts, is located at Suite C, in Cupertino,
Ca. 95014,
I wish to request and vote that they be allowed to stay at this location. Since there is no longer a shopping center that is
easy to
access in either Cupertino or Sunnyvale, it would be much better and easier for clients to keep Happy Cuts at this location
as there are a lot of customers that use this location. Thank you for your consideration.
Total Control Panel Lo�in
To:planning�a cupertino.org Message Score: l0 High(60):
From:joyceclark27@yahoo.com My Spam Blocldng Level:High Medium(75):
Low(90):
Block this sender
Block yahoo.com
This message was delivered because the content filter score did not exceed your filter level.
1
Attachment 4
(page 3 of 3)
From: Ilka Atanassova [mailto:ilka68@�mail.com]
Sent: Monday, October 16, 2017 1:58 PM
To: City of Cupertino Planning Dept. <plannin�@cupertino.or�>
Subject: 21020 Homestead Blvd
Hello,
Me and my family want to vote against new Bank of America development. We've been clients
to the excellent Happy Cuts for more than 5 years now and we want them to stay and serve our
community.
Best regards,
Ilka Atanassov