Loading...
HomeMy WebLinkAboutAH Packet 10-26-17 CITY OF CUPERTINO AGENDA C U P E RT I N D ADMINISTRATIVE HEARING 10300 Torre Avenue, City Ha❑ Conference Room C Thursday, October 26, 2017 5:00 PM REVISED-at 4:OOpm to make changes to the Draft Minutes document ROLL CALL APPROVAL OF MINUTES Subject: Draft Minutes of June 8, 2017 Recommended Action: approve or modify the Draft Minutes of June 8, 2017 Draft Minutes of June 8 2017 POSTPONEMENTS Subject: Architectural and Site approval to allow exterior building and site modifications to an existing Jack in the Box restaurant. Application No(s): ASA-2017-07; Applicant(s): Greg Borchardt (Albert Tung); Location: 1451 S De Anza Boulevard APN# 366-19-044 per the applicant's request, Postponed to the November 9, 2017 meeting ORAL COMMUNICATIONS This portion of the meeting is �eserved for persons wishing to add�ess the membe�s on any matter not on the agenda. Speakers are limited to three (3) minutes. In most cases, State law will prohibit the members f�om making any decisions with �espect to a matte� not listed on the agenda WRITTEN COMMUNICATIONS PUBLIC MEETINGS Subject: Architectural and Site approval to allow exterior building and site Page 1 Administrative Hearing AGENDA October 26,2017 modifications to an existing Jack in the Box restaurant. Application No(s): ASA-2017-07; Applicant(s): Greg Borchardt (Albert Tung); Location: 1451 S De Anza Boulevard APN# 366-19-044 per the applicant's request, Postponed to the November 9, 2017 meeting Subject: Architectural and Site Approval to consider the construction of a new 4,172 square feet Bank of America branch building to replace an existing 5,265 square feet multi-tenant commercial building, including associated site and street frontage improvements including a paved plaza area at the northeast corner of the site and a Tree Removal Permit to allow for the removal of 14 protected trees. Application No(s).: ASA-2017-OS and TR-2017-39; Applicant(s): Whitney Marr (C&L Investments, LLC); Location: 21020 Homestead Rd APN# 326-07-020 Recommended Action: That the Hearing Officer: 1. Find that the proposed actions are exempt from CEQA; and 2. Adopt a resolution to approve the Architectural and Site Approval and Tree Removal permits in accordance with the draft resolutions (Attachments 1 and 2). Administrative Hearing Officer's decision final unless appealed Staff Report 1 -Draft Resolution for ASA-2017-OS 2 -Draft Resolution for TR-2017-39 3 -Plan Set 4-Written Public Comments OLD BUSINESS NEW BUSINESS ADJOURNMENT Page 2 Administrative Hearing AGENDA October 26,2017 In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend the next meeting who is visually or hearing impaired o� has any disability that needs special assistance should call the City Cle�k's Offzce at 408-777-3223, 48 hours in advance of the �neeting to arrange for assistance. Upon �equest, in advance, by a pe�son with a disability, meeting agendas and writings distributed fo� the meeting that are public �eco�ds will be made available in the appropriate alte�native fo�mat. Also upon request, in advance, an assistive listening device can be made available for use du�ing the meeting. Any writings or documents provided to a majority of the members after publication of the agenda will be made available for public inspection. Please contact the City Clerk's Office in City Hall located at 10300 To�re Avenue during normal business hou�s. IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal Code 2.08100 written communications sent to the Cupertino City Council, Commissioners or City staff concerning a matte� on the agenda are included as supplemental material to the agendized item. These written communications are accessible to the public through the City's website and kept in packet archives. You are he�eby admonished not to include any pe�sonal or private information in w�itten communications to the City that you do not wish to make public; doing so shall constitute a waiver of any privacy rights you may have on the information provided to the City. Members of the public are entitled to address the membe�s conce�ning any item that is described in the notice or agenda for this meeting, before or du�ing consideration of that item. If you wish to address the membe�s on any othe� item not on the agenda, you may do so du�ing the public comment. Page 3 Cupertino, CA 95014 (408) 777-3308 ACTION MINUTES OF THE REGULAR MEETING OF THEADMINISTRATIVEHEARING HELD ON June8, 2017 ROLL CALL Hearing Officer present: Catarina Kidd, Senior Planner Staff present: Ellen Yau, Assistant Planner Applicant(s) present: APPROVAL OF M IN UTES: 1. M inutes of February 23, 2017 Theminutesof February 23, 2017wereapproved aswritten POSTPON EM EN TS�REM OVA L FROM CA L EN DA R: N one ORAL COMMUNICATION: N one WRITTEN COMMUNICATIONS: N one PUBLIC HEARING ITEMS: 2. Application No.(s): U-2017-05 Applicant: Mark Dimalanta (Cupertino Property Development) Location: 10088 N Wolfe Rd #130 APN#316-20-108 Use Permit to allow for additional outdoor seating to a previously approved patio area to include two (2) additional tables for a total of four tables and 32 seats at an existing restaurant (Steins Beer Garden) located in the N ineteen800 mixed use development project Administrative Hearing decision final unless appealed. 2 Administrative Hearing Ju n e 8,2017 Staff Member Serrano presented the Staff Report to the Hearing Officer. The applicant would liketo modify their existing current after school day careoperationsfrom 12 (noon) to 6:30 pm with a maximum of 90 students, as per Planning Commission approval in 2009, to an all-day private daycare/afterschool care program with a maximum 70 students, aged 2 to 6 years, and 8 Staff inembers. They would also like to add a play area and a play structure. The daycare operations require 11 parking spaces and parents are required to use the on-site spaces when dropping off or picking up their children. The church operations require 57 spaces, so there is ample parking on site to allow for both daycare and church office operations should both activities be occurring at the same time. The site is Zoned Quasi-Pubic (BQ). It is surrounded on the east, west and north by singlefamily residences and on the south by Jollyman Park. The City'strafficEngineer reviewed theproject and believesthat thetrafficadded during morning or afternoon peak traffic commute hour is minimal. Additionally, with the reduction in students, no traffic mitigation measures are required. The proposed play structure is 14' in height and will be set back 55' from the nearest residential property, located to the east. A Noise Study was prepared by the City's Acoustic Consultant. This study determined that the decibel levels were expected to be intermittent and between 50 to 60 decibels at 30 to 40 feet within the play yard. Dueto thewooden fences, the decibel level would drop 12 to 13 decibels in the yards of the closest residences. This noise level does not require mitigation measures. The project was properly noticed for a public hearing and in addition the property owner conducted two outreach meetings to help explain the project to their neighbors. Staff has received questions regarding the project concerning; permitted uses, expiration of permitted uses, noise and parking and traffic and safety. The Sheriff's office was informed of the safety concerns. They stated that the Church property has not been a safety issue in the past. The other concerns have been addressed in the Staff Report. Staff supports approval of the project as it meets all of the City's Municipal Code requirements and the conditions of approval addressesand/or mitigatesother concernsraised. The Hearing Officer confirmed that the prior approval was for 90 students to be on site from 12 (noon) to 6:30pm and that the new proposal is to have 70 students on site from 7:OOam to 6:30pm. He clarified the number of parking spaces and the distance from the play structure to the nearest home. DECISION: Theapplication wasapproved by the Hearing Officer per thedraft resolution with thefollowing additions/modifications: 1) That there be additional noise monitoring of the play structure during its use to ensure that the decibel levels remain within the City's N oise Ordinance threshold 2) The start time for drop of students be at 8:OOam, teachers and staff can arrive earlier 3) The be a designated on-site person to assist and monitor the drop off/pick up activities 3 Administrative Hearing Ju n e 8,2017 4) Continue to work with the City's Public Works' Staff regarding the study of the feasibility and implementation of adding an additional driveway off of Stelling Road to reducetrafficon ,bllyman Road ADJOURNMENT Respectfully submitted: /s/Beth Ebben Beth Ebben AdministrativeAssistant g:planning/AH Committee/Minutes0608U OFFICE OF COMMUNITY DEVELOPMENT PLANNING DIVISION CITY HALL 10300 TORRE AVEN U E• CU PERTI N O,CA 950143255 C U P E RT I N O (408)777-3308• FAX(408)777-3333 ADMINISTRATIVE HEARING STAFF REPORT Agenda Date: October 26, 2017 SUBJECT Architectural and Slte Approval to consider the construction of a new 4,172 square feet Bank of America branch building to replace an existing 5,265 square feet multi-tenant commercial building, including associated site and street frontage improvements includingapaved plazaareaatthenortheastcornerofthesiteand aTreeRemoval Permit to allow for the removal of 14 protected trees; (Application No(s).: ASA-2017-05 and TR- 2017-39; Applicant(s): Whitney Marr (Gensler); Location: 21020 Homestead Road; A PN(s): 326-07-020) RECOMMENDED ACTION That the Hearing Officer: 1. Find that the proposed actions are exempt from CEQA; and 2. Adopt the resolutions to approve the Architectural and S1te Approval and Tree Removal permits in accordancewith the draft resolutions(Attachments 1 and 2). DISCUSSION Project Data: General Plan Designation: Com m erci al Special Area: Stelling Gateway in the Homestead S�ecial Area Zoning Designation: P(CG) Planned Development (General Commercial) Existing Proposed Lot Size: 25,422 sq. ft. 24,163 sq. ft. (1,259 sq. ft. dedicated to the City) Floor Area and Use: 5,265 sq. ft. multi-tenant 4,172 sq. ft. bank branch commercial building ASA-2017-05 21020 Homestead Road (Bank of America) October 26,2017 TR-2017-39 Page 2 Setbacks Required Proposed Front: Based on GPpoliciesand adequatefor light, 22'-6" air and visibility. GP requires a 1:1 height to setback ratio from curb on Homestead Rd. Street Stide: Nonerequired 25' Interior Slde: Nonerequired 50' Rear: N on e req u i red 74' Parking Auto Parking: 17 spaces 33 spaces Bi cy cl e Par k i n g: 4 sp aces 4 sp aces Maximum Proposed Height: 30' 22' Project Consistency with General Plan: Yes Zoning: Yes Environmental Categorically Exempt per Section 15302, Class2 (Replacement Assessment: or Reconstruction) of California Quality Act (CEQA) Background: Slte Description The project site is located within the Homestead Special Area in the Stelling Gateway on the southwest corner of Homestead and N. Stelling Roads. The Stelling Gateway is located close to city limits, with the City of �nnyvale located on the north side of Homestead Road and theCity of Cupertinoon thesouth. Theland usessurrounding the intersection are mainly commercial and retail uses in both jurisdictions with the closest residences to the subject property more than 300 feet to the northeast. The Homestead S�ecial Area,which extendsfrom N. , , - ,�:,�„� � ,� ..� _ ; Blaney Ave. on the east to N oranda � � � ���'#�� T SITE VICINITY h�� � � Dr. west of N. Stellin Rd. on the '- �' '�'I��''� � ��� �� - � l � 9 ) k ` ' , . , �-, west, is intended to continue as a � '����`►�"" ������ � � � "��� predominantly mixed-use area with :��_ �. ' i �����_'�" _ ° �� T ���. residential uses and neighborhood � �^ _ " �;;�;r,: � �: ����� � centers providing services to local ��� �`^��' ;"' � �,�'' - �aa�, ,�„„ residents. � - a� �� , _ �,�,���,��.��� .j • . � � - 4..`�_ ,� L , �,� �? � �I � •I The property is bounded on the ° ; - west and to thesouth by thelandsof - -- ' + _ �� ��' = � �, r � ��� �� .- � i `�' '� ,:,�� Valley Church of Santa Clara �u,, , � � � i _...�'' County; to the north by a ' � -�� ;� �,�' �Y °' ASA-2017-05 21020 Homestead Road (Bank of America) October 26, 2017 TR-2017-39 Page 3 commercial center located in the City of �nnyvale, with an Orchard Supply Hardware, CVS Pharmacy, Taco Bell and several restaurant and retail tenants; to the northeast by a SpeeDee Oil Change and Auto Service building; and to the east by a commercial center with several restaurant tenants, a McDonald's restaurant, and a bowling alley (Homestead Lanes). Most of the properties surrounding the subject site are developed with singlestory buildings. The site currently has a single-story multi-tenant commercial building constructed in 1980 with three tenants: a beauty salon, a massage therapy office, and a chiropractor off i ce. A�plication Requests The applicant is seeking to construct a new Bank of America branch building to replace the existing building on the site. The proposed use is a permitted use in this zoning district, therefore no Conditional Use Permit is required. However, an Architectural and StiteApproval permit isrequired in order toapprovethearchitectureand associated site improvements, including re-pavement of the parking lot, re-landscaping at the site, construction of a plaza at the northeast corner of the property, and a new trash enclosure toservicethecenter.Theimprovementsincludetheremoval of 14existing protected trees for which a Tree Removal permit is required. The application also includes a comprehensive site-wide tree replacement plan in conjunction with the proposed new building, landscaping, and off-site improvements. While the Tree Removal Permit may be approved by the Director of Community Development without a public meeting, the zoning code requires review by the highest approval authority when applications are combined. Therefore, the permit must be reviewed concurrently with the Architectural and Site Approval permit at an Administrative H earing. Slgnage is not approved as part of this proposal. Therefore, any future signs must be approved through a sign permit or a Master Stign Program. Additionally, the property is located in a zone where all fencing must be reviewed and approved by the City prior to installation. Therefore, any existing unpermitted fencing will be required to be removed and any new proposal for fenceswill need additional staff review. Analysis: The applicant team hasworked extensively with staff to address policies in General Plan: Community Vision 2015-2040 such as site planning, building and parking location, building layout, street interfaces, reduced driveway openings, shared and consolidated driveway access, sidewalk and street frontage landscaping, pedestrian-oriented public spaces, and publicart. ASA-2017-05 21020 Homestead Road (Bank of America) October 26, 2017 TR-2017-39 Page 4 S1te Planning and Architectural Design The proposal maintainsthe general building location and parking lot configuration as it currently exists, with the building located at the northeast portion of the property, and theparking located at therear of thebuilding. Theproposal locatesthebusinessentrance close to the street to enhance the street interface and to provide a safe entry point for pedestrians accessing the building from the public sidewalks. Pedestrian activity is promoted at the site by maximizing window openings along both street frontages and placing a plaza at thecorner of the parcel (further described below). Additionally, special paving leading up to the bank from the parking lot also helps to improve pedestrian experienceand accessfrom theprimary parking lot. The building is proposed with smooth stucco finish throughout, aluminum metal paneled canopy over select areas, and clear windowsspanning the northern and eastern elevationswhereofficesand entrancesarelocated. Thesouthern and western portionsof the building, wheretheback-of-officefacilitiesarelocated, facethe L-shaped parking lot. Slncethesewallsare largely void of any fenestrations, latticesand vine landscaping have been added at the city's consultant architect's recommendation. The proposed automatic teller machines (ATM) are located within a card-protected 24- hour vestibulelocated at thesoutheast portion of thebuilding and visiblefrom N. Stelling Road. Thelightingfor areasaround ATMsarerequired by theCupertino Municipal Code to be in conformance with the minimum standards required by the State of California Businessand ProfessionsCodeand will befurther reviewed prior to issuanceof building permits. PI aza TheCupertino General Plan setsgoalsto promote publicspacesthat enhancecommunity identity and character (Policy LU-2.2:Pedestrian-Oriented Public Spaces)and developments are required to incorporate pedestrian-scaled elements along the street to meet such goals. Whilethearchitectural consultant recommended that theemployeearea located at the southwest corner of the building include additional design elements for more usability and higher visual quality and serve as a gathering spot, no changes have been made in this area due to the bank's need to maintain the area clear of any visual obstructions or barriers to address security concerns. The provision of the plaza at the northeast corner as the public side/face of the site is an acceptable alternative. The proposed plazaservesasan enhanced publicamenity and isdesigned with ground-level decorative pavers and concrete seat-walls with precast stone veneers, but has limited landscaping. Thearchitectural consultant recommendsadding tall shadetreesat thecorner similar to those on the S�eeDee site in the City of SLnnyvale and adding a public art piece. No ASA-2017-05 21020 Homestead Road (Bank of America) October 26, 2017 TR-2017-39 Page 5 public art piece has been proposed by Bank of America since it appears that previous issueswith controversial art hasled to a corporate policy that limitsthe ability to include art piecessuch as, muralsor sculptures.Additionally, no changesweremadeto the plans to add shade trees at the plaza. A condition of approval has been added to require the planting of a medium-sized shadetreeto thesatisfaction of theCity in consultation with the City's consulting arborist and the integration of small landscape areas closest to the right of way and/or planter potswithin the plaza area. Landscapinq & Trees As part of the on-site improvements, the proposal includes removal of 14 existing development (protected)treesthatweredetermined to beunsuitablefor retention dueto decline in health, poor horticultural care and maintenance practices, conflict with proposed street improvements, and species incompatibility with newly proposed storm water infiltration areas. In order to mitigate the removal of the trees, the applicant team proposes to plant five Red Maples (Acer rubrum), two Zelkovas (Zelkova serrulata), and nine Crape Myrtles(Lagerstroemia spp.). The replacement trees are dispersed throughout the site: within the newly proposed water infiltration areas adjacent to parking, along thefront and street sidesetbacks along the street frontages and in the plaza area as conceptualized in the landscape plan (Attachment 3). While the tree replacements will increase the limited existing canopy coverage, the proposed species will need to be evaluated as sufficient shade trees in conformance with General Plan policies (Strategies E�2.1.5: Urban Forest and E�5.1.2: Built Environment). Theconditionsof approval regarding landscaping includeprovisions to ensure that the final landscape plan indicate additional ground cover in the area adjacent to the intersection where paving is proposed and that the final species of replacement trees be reviewed and approved by the City in consultation with the City's Consulting Arborist prior to issuanceof building permits. Parking and Circulation The development provides 33 parking spaces (16 auto parking spaces more than required) and 4 bicycle parking spaces in compliancewith the City's Parking Ordinance. As mentioned previously, the parking is located at the rear of the building to ensurethat driveway approaches are spaced appropriately away from the intersection as well as to promoteactivestreetfrontages. Furthermore, thebicycleparking isconveniently located at theentranceof thebank building facing and adjacent to North Stelling Road, wherea Class IV separated bike lane is envisioned in the Cupertino BicycleTransportation Plan. There are two driveways located within 50 feet of each other on Homestead Rd, one serving the subject site and one serving the adjacent property (Valley Church). The Cupertino General Plan sets a goal of improving walkability and bikeability and, to that ASA-2017-05 21020 Homestead Road (Bank of America) October 26,2017 TR-2017-39 Page 6 end, identifies policies to further this goal. One of the � �---�y � policies, Policy M-3.5: Curb Cuts states " Minimize the �`" � number and the width of driveway openings" and also � � ; , 5� � � ,;���,'.,� encouragestheshared useof drivewayswherefeasibleand � ��� _ � � � �,_y authorizesdriveway closures, consolidationsor both when �� `�ti y ;� � asiteisredeveloped or remodeled (Strategy M-3.5.1: Shared ,� � �{ ._� _- Driveway Access).The proposal was reviewed for � :� � �� ������ � � conformance with these policies and strategies and it was � � determined that thetwo driveways should beconsolidated !� � to improvesafety and walkability. �" � SHARED DRIVEWAY CONCEPT The applicant is agreeable to working with the property �� �� ` " �� owners of Valley Church to reduce the number of driveway cuts along Homestead by consolidating theexisting driveways(indicated in red in Shared Driveway Concept) and utilizing shared driveway access. Discussions were initiated for pursuing the driveway consolidation and during preliminary discussions, it was determined that the shared driveway would liewhere currently thereisa PG&E electricjunction box, and fiber optic linesand meters. Duetotheanticipated timethatwould berequired toengagewith and receiveapprovalswith theappropriateutility providers, itwasagreed that consolidation for the driveway on Homestead Road could be deferred to a later time and would not need to beincluded in thisscopeofwork. However, it was agreed that in the interim, the applicant would reducethewidth of the driveway off of Homestead Road to 24 feet for a safer pedestrian and bicycle street interface. This has been indicated on the proposed plans. A condition of approval has been added that if the applicant is unable to obtain a building permit to implement the shared driveway prior to final occupancy, a covenant shall be recorded instead, to memorialize the agreement to consolidate the western driveway and to record appropriate ingress/egress easements for access, at a time when the City can require the same of the adjacent property. Street Improvements Off-site improvements consisting of sidewalk, curb, and driveway (discussed above) work will be required with thisproject. Currently, a monolithicsidewalk islocated along the property's street frontages but as part of off-site improvements it will be replaced with adetached sidewalk tothesatisfaction of theDirector of PublicWorks. Furthermore, the pedestrian curb ramp at the intersection of Homestead and N. Stelling Roadswill be reconfigured and a traffic signal pole will be relocated. In addition, a dedication of land of up to 10 feet in width along the project frontage, to the satisfaction of the Director of PublicWorks, isrequired. ASA-2017-05 21020 Homestead Road (Bank of America) October 26, 2017 TR-2017-39 Page 7 Environmental Review This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15302— Replacement or Reconstruction becausetheexemption appliestothereplacement or reconstruction of existing structures and facilitieswherethenew commercial structurewill belocated on thesamesiteasthe structure replaced and will havesubstantially thesamesize, purpose, and capacity asthe structure replaced. Other Department/Agency Review The City's Public Works Department; Building Division; Environmental Programs Division; the Santa Clara County Fire Department; Cupertino Sanitary District; and Recology reviewed the request and have no objections to the project. Their pre-hearing commentshavebeen incorporated asconditionsof approval in thedraft resolutions. PUBLIC NOTICING AND COMMUNITY OUTREACH Thefollowing table is a brief summary of the noticing for this project: Noticeof PublicHearing Agenda ■ S1te Slgnage (at least 14 days prior to ■ Posted on theCity'sofficial notice hearing) bu I I eti n board �five days prior to ■ 8 notices mailed to property owners hearing) adjacent to the project site(at least 10 days ■ Posted on the City of Cupertino's prior to the hearin ) Web site ive da s prior to hearin ) As of October 19, 2017, staff has received comments from four people. Written public commentsareincluded asAttachment4. Two people stated that they were opposed to the proposed development as they were patronsof Happy Cutswhich they wished to remain at thesite. A member of the public shared their confusion on the necessity of another bank branch particularly when replacing an existing fully-tenanted commercial building that provides the community with personal servicesand felt a bank branch would be better located in an areathat can beeasily accessed by foot likeashopping mall. Furthermore, they shared concernswith regard tothetreeremoval and proposed landscaping plans. Another member of the public verbally expressed concerns about the traffic impact of additional construction on Homestead Road stating that it is very inconvenient for the community and that left turnsout of thedevelopment aredangerous. ASA-2017-05 21020 Homestead Road (Bank of America) October 26, 2017 TR-2017-39 Page 8 PERMIT STREAMLINING ACT This project is subject to the Permit Streamlining Act (Government Code Section 65920— 65964). TheCity hascomplied with thedeadlinesfound in the Permit Streamlining Act. Project Received: M ay 26, 2017; Deemed Incomplete: Ju ne 26, 2017 Revisions Received: August 31, 2017; Deemed Incomplete: September 28, 2017 Revisions Received: October 11, 2017; Deemed Complete: October 11, 2017 Slnce this project is Categorically Exempt, the City has 60 days (until December 11, 2017) to make a decision on the project. CONCLUSION Staff recommends approval of the Architectural and Slte Approval and Tree Removal Permits, since the plans and conditions of approval address all concerns related to the proposed project. Additionally, all of the findingsfor approval of the proposed project, consistent with Chapters 14.18and 19.168of theCupertino M unicipal Code, may be made asreflected in theDraft Resolutions. NEXT STEPS The permit will be effective 14 calendar days from the date of the hearing. The decision of the Administrative Hearing Officer is final, unless appealed within 14 calendar days from the date of the hearing. The applicant team may apply for building and/or other permitswith theCity at theend of theappeal period. This approval is valid until October 26, 2019. The applicant team may apply for a one- timeoneyear extension beforetheapproval expires. Prepared by: Ellen Yau, Assistant Planner Approved by: Piu Ghosh, Principal Planner ATTACHMENTS 1. Draft Resolution for ASA-2017-05 2. Draft Resolution for TR-2017-39 3. PI an Set 4. Written PublicComments CITY OF CUPERTINO 10300 TorreAvenue Cupertino, California 95014 DRAFT RESOLUTION OFTHEADMINISTRATIVEHEARING MEETING OFTHECITYOFCUPERTINOTO CONSIDERTHECONSTRUCTION OFA NEW 4,172SQUAREFEET BANK OF AMERICABRANCH BUILDINGTOREPLACEAN EXISTINGSINGLE-STORY5,265 9QUAREFEETMULTI-TENANTCOMMERCIAL BUILDING, INCLUDING ASSOCIATED SITEAND STREET FRONTAGE IMPROVEMENTSINCLUDINGA PAVED PLAZA AREA AT TH E N ORTH EAST CORN ER OF TH E SITE AT 21020 HOMESTEAD ROAD. SECTION I: PRO.�CT DESCRIPTION Application No.: ASA-2017-05 Applicant: Whitney Marr (Gensler) Location: 21020 Homestead Road (APN #326-07-020) SECTION II: FINDINGS WHEREAS, the Administrative Hearing Meeting of the City of Cupertino received an application for a new 4,172 square feet Bank of America branch building to replace an existing single-story 5,265 square feet multi-tenant commercial building, including associated site and street improvements, including a paved plaza area at the northeast corner of the site; and WHEREAS, the project is categorically exempt from the California Environmental Quality Act (CEQA); WH EREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and theAdministrative Hearing Officer has held at least one public meeting in regard to theapplication; WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, theAdministrativeHearing Officerfinds: Draft Resolution ASA-2017-05 October 26,2017 Page 2 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The proposal maintains the general building location and parking lot configuration as it currently exists, with the building located at the northeast portion of the property, and the parking located at the rear of the building. The project proposal will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience. The project would be required to detach the existing monolithic sidewalk along the property's street frontage. This would improve the pedestrian experience and safety. The proposal also includes mitigations to reduce the width of existing two-way driveway curb cuts which would further enhance the site and ameliorate impacts to pedestrians and bicyclists. 2. The proposal is consistent with the purposes of Chapter 19.168, Architectural and Slte Review, of the Cupertino Municipal Code, the General Plan, any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision mapsor other entitlementsto usewhich regulatethe subject property including, but not limited to, adherence to the following specific cri teri a: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should beachieved between new and existing buildings; Most of the properties surrounding the subject site are developed with single story buildings and the proposed building maintains the single-story scale and increases to the height of the building are primarily to incorporate parapets in order to screen anticipated rooftop equipment. Additionally, the mass of the building is accentuated with a combination of wall articulation, decorative cornices, metal awnings, and significant window fenestration. Furthermore, the proposed changes to the height of the structure are within the regulations established in the General Plan: Community Vision 2015-2040. b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new buildings should harmonize with adjacent development by being consistent or compatible with design and color schemes, and, with the future character of the neighborhood and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elementsof parking lotsshould beconcealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the Draft Resolution ASA-2017-05 October 26,2017 Page 3 unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments, and provide shielding to prevent spill-over light to adjoining property owners; The newly proposed architectural design, materials,finishes, and textures will be consistently applied to the entire building fa�ade to allow for four-sided complete architectural integrity and will be compatible with the character of the neighborhood as a mix of commercial and residential-scaled design. The proposal includes no changes to the location, height, and materials of walls and fencing. Any unpermitted fencing will be removed as part of this development. Landscaping is being proposed to soften the edges of the development, to enhance on-site amenities, provide relief on building walls, and are intended to harmonize with adjacent property through the installation of adequate amounts of groundcover and shade trees throughout. Furthermore, the proposal includes the construction of a trash enclosure at the rear of the parking lot which will conform to the City's requirements to screen and shelter waste collection bins. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures shall minimize traffic hazards and shall positively affect the general appearance of the neighborhood and harmonize with adjacent development; and No signage is approved as part of this proposal. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures The proposal is a new development that maintains the general scale, building location, and parking lot configuration as it currently exists. This development is not within an existing residential neighborhood. Therefore, this finding does not apply. However, the proposed landscaping and tree plantings around the parking lot, street frontages, and in the public plaza will provide visual buffering of the buildings and will enhance the tree canopy coverage on-site, and protect the closest residents, that are located 300 feet northeast of the subject site, from visually intrusive effects. N OW, TH EREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, theApplication No. ASA-2017-05, is hereby approved; and Draft Resolution ASA-2017-05 October 26,2017 Page 4 That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the public hearing record concerning Application No. ASA-2017-05 as set forth in the Minutes of the Administrative Hearing Meeting of October 26, 2017, and are incorporated by reference herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPM EN T DEPARTM EN T 1. A PPROV ED EXH I BI TS Approval is based on the plan set titled "Bank of America Homestead Road New Store" dated 10/18/17 drawn by Gensler consisting of eleven (11) sheets labeled "A 00.50, A 00.51, A 00.52, A 00.53, A 09.11, A 09.15, L.01, L.02, E-0.0, Sh eet 1 of 1, an d C.1, except as may beamended by conditions in this resolution. 2. CONCURRENTAPPROVAL CONDITIONS The conditions of approval contained in file no. TR-2017-39 shall be applicable to this approval. 3. ANNOTATION OFTHECONDITIONSOFAPPROVAL The conditions of approval set forth shall be incorporated into and annotated on the building plans. 4. ACCU RACY OF PRO.�CT PLA N S The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may requireadditional review. 5. DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible, in accordance with the City's Recycling and Diversion of Construction and Demolition Waste under Chapter 16.72 of the Cupertino Municipal Code. The applicant shall provide evidence that materials were recycled prior to issuance of final demolition permits. 6. LIGHTING On-site lighting must be in conformance with Cupertino Municipal Code Chapter 19.60 and automatic teller machine lighting, specifically, shall meet minimum standards required by the State of California Business and Professions Code. Draft Resolution ASA-2017-05 October 26,2017 Page 5 7. GREEN SCREEN S The applicant will be required to install and maintain the green screens along the western and southern walls as indicated on pages A09.11, L0.1 and L0.2 of the approved exhibits. 8. FENCING The applicant will be required to remove all unpermitted fencing to the satisfaction of the Director of Community Development prior to issuanceof building permits. 9. A RBO RI ST REV I EW Prior to building permit issuance, an arborist review will be required as listed in the conditionsof approval contained in fileno. TR-2017-39. 10. LANDSCAPEDOCUMENTATION PACKAGE Prior to issuance of building permits, the applicant shall submit a full Landscape Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape Ordinance. The Landscape Documentation Package shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits, and additional requirements per sections 14.15.050 E, F, G, H, and I will be required to be reviewed and approved prior to final inspections. 11. LANDSCAPEAND IRRIGATION PLANS The applicant shall submit detailed landscape and irrigation plans to be reviewed and approved by the Directors of Community Development and Public Works or his/her designee prior to issuance of building permits. The landscape plan shall include water conservation and pesticide reduction measures in conformance with Chapter 14.15, Landscape Ordinance, and the pesticide control measures referenced in Chapter 9.18, Stormwater Pollution Prevention and Watershed Protection, of the Cupertino Municipal Codeand shall also beamended to ensurethat: a. Additional landscaping in the area closest to the right of way is incorporated through ground-level landscaping and/or in appropriately sized planter pots within the plaza area. The landscape planter box, fencing, landscaping, irrigation and/or plaza area design shall be reviewed and approved by the Director of Community Development prior to issuanceof building permits; and b. A medium sized shade tree is planted at the plaza area subject to review and approval by the City in consultation with the City's Consulting Arborist; and c. The final list of replacement trees is approved by the City in consultation with the city's consulting arborist to reduce the number of crape myrtle trees proposed as replacement trees. Draft Resolution ASA-2017-05 October 26,2017 Page 6 12. LANDSCAPEAND IRRIGATION MAINTENANCE Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be established and submitted to the Director of Community Development or his/her designee, either with the landscape application package, with the landscape installation report, or any time before the landscape installation report is submitted. a) Schedules should take into account water requirements for the plant establishment period and water requirementsfor established landscapes. b) Maintenance shall include, but not be limited to the following: routine inspection; pressure testing, adjustment and repair of the irrigation system; aerating and de-thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of failed plants; weeding; pest control; and removing obstructionsto emission devices. c) Failed plants shall be replaced with the same or functionally equivalent plants that may be size-adjusted as appropriate for the stage of growth of the overall installation. Failing plantsshall either be replaced or be revived through appropriate adjustments in water, nutrients, pest control or other factors as recommended by a landscaping professional. 13. LANDSCAPEAND IRRIGATION INSTALLATION REPORT Theproject issubject to all provisionsdelineated in the LandscapeOrdinance(CMC, Chapter 14.15). A landscape installation audit shall be conducted by a certified landscape professional after the landscaping and irrigation system have been installed. The findings of the assessment shall be consolidated into a landscape installation report. The landscape installation report shall include, but is not limited to: inspection to confirm that the landscaping and irrigation system are installed as specified in the landscape and irrigation design plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that causes overland flow, and preparation of an irrigation schedule. The landscape installation report shall include the following statement: "The landscape and irrigation system have been installed as specified in the landscape and irrigation design plan and complies with the criteria of the ordinance and the permit." 14. DRIVEWAYCONSOLIDATION AND INGRESSiEGRESSEASEMENT Should the applicant not obtain appropriate building permits and record appropriate easements for consolidation of the west driveway off of Homestead Road prior to issuance of building permits for the bank building, prior to final Draft Resolution ASA-2017-05 October 26,2017 Page 7 occupancy, the applicant shall record a covenant (or whichever legal document deemed appropriate by the City) agreeing to consolidatethe existing driveway off of Homestead Road and record an appropriate Reciprocal Access Easement over portions of the property for shared driveway access. The nonexclusive easement shall provide vehicular and pedestrian ingress and egress over the area for shared driveway access. The easement language shall provide that construction of the driveway shall be completed/connected to the City's satisfaction at such time as the city can require the adjacent property owner to agree to consolidate the driveway and provide a reciprocal ingress/egress easement through a planning permit. The agreement language including the driveway and easement layout shall be reviewed and approved by the City prior to recordation with the County Recorder's Office. The easement shall contain a provision that it may not be modified or removed without expresswritten approval from theCity. 15. SCREEN I N G All mechanical and other equipment on the building or on the site shall be screened so they are not visiblefrom public street areasor adjoining developments. Screening materials/colors shall match building features and materials. The height of the screening shall be taller than the height of the mechanical equipment that it is designed to screen. The location of equipment and necessary screening shall be reviewed and approved 16. UTILITY STRUCTURE PLAN Prior to issuanceof building permits, theapplicant shall work with staff to providea detailed utility plan to demonstrate screening or undergrounding of all utility structures [including, but not limited to backflow preventers (BFP), fire department connections (FDC), post-indicator valves (PIV), and gas meters] to the satisfaction of the Director of Community Development, Public Works, Fire Department, and applicable utility agencies. 17. WINDOW DETAILS The frontage windows shall be kept open and transparent to the greatest extent possible. The final storefront design and window display shall be reviewed and approved by the Director of Community Development prior to issuanceof building permits for tenant improvements. No changes shall be made to the transparency of the windows without the express approval of the Director of Community Development. 18. EXTERIORBUILDING MATERIALS�TREATMENTS The final building exterior plan shall closely resemble the details shown on the Draft Resolution ASA-2017-05 October 26,2017 Page 8 original approved plans. Final building exterior treatment plan (including but not limited to details on exterior color, materials, architectural treatments, doors, windows, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits to ensure quality and consistency. Any exterior changes determined to be substantial by the Director of Community Development shall either require a modification to this permit or a new permit based on the extent of the change. 19. CONSULTATION WITH OTHERDEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 20. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest thesefees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS D EPA RTM EN T 21. TRA FFI C I M PA CT FEES The Project may be subject to pay Traffic Impact Fees. Thefee is currently estimated to beset at $7,000 per new AM or PM peak-hour trip generated by the Project subject to be approved by the City Council in August 2017. 22. STREET IMPROVEMENTS& DEDICATION Provide a dedication and frontage improvements along the project frontage to the satisfaction of the Director of Public Works. Street improvements may include, but not be limited to, new detached sidewalk, new ADA ramp, driveways, storm drain lateral, street tree installations, and street light and/or pedestrian push button relocation. Draft Resolution ASA-2017-05 October 26,2017 Page 9 23. PED ESTRI A N A N D BI CYCL E I M PROV EM EN TS Developer shall provide pedestrian and bicycle related improvements(e.g. walkway and bicycle racks, etc.) consistent with the Cupertino Bicycle Transportation Plan and the Pedestrian Transportation Guidelines, and as approved by the Director of Public Works. 24. STREET LIGHTING INSTALLATION Street lighting shall be installed and shall be as approved by the Director of Public Works. Lighting fixtures shall be positioned so as to preclude glare and other forms of visual interference to adjoining properties, and shall be no higher than the maximum height permitted by thezone in which thesite is located. 25. GRADING AND DRAINAGE Grading shall be as approved and required by the Director of Public Works in accordancewith Chapter 16.08of theCupertino Municipal Code. All storm drain inletsshall beclearly marked with thewords" No Dumping — Flows to Creek" using permanently affixed metal medallions or equivalent, as approved by the Environmental Programs Division. 26. C.3 REQU I REM EN TS C.3 regulated improvements are required for all projects creating and/or replacing 10,000 S.F. or more of impervious surface (collectively over the entire project site). The developer shall reserve a minimum of 4% of developable surface area for the placement of low impact development measures, for storm water treatment, unless an alternative storm water treatment plan, that satisfies C.3 requirements, is approved by the Director of Public Works. The developer must include the use and maintenance of site design, source control and storm water treatment Best Management Practices (BMPs), which must be designed per approved numeric sizing criteria. A Storm Water Management Plan, Storm Water Facilities Easement Agreement, Storm Water Facilities Operation and MaintenanceAgreement, and certification of ongoing operation and maintenanceof treatment BMPsareeach required. All storm water management plans are required to obtain certification from a City approved third party reviewer. Draft Resolution ASA-2017-05 October 26,2017 Page 10 27. I M PROV EM EN T A GREEM EN T The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for under grounding of utilities. Said agreement shall be executed prior to issuance of construction permits. Fees: a. Checking & Inspection Fees: $ Per current fee schedule ($6,266.00 or 5% of improvement costs) b. Grading Permit: $ Per current fee schedule ($2,825.00 or 6% of improvement costs) c. Development Maintenance $ 1,000.00 Deposit: $ Per current fee schedule ($8,790.00 per d. Storm Drainage Fee: AC) e. Traffic Impact Fee: $7,000 per new AM or PM peak-hour f. Power Cost: trip g. Storm Management Plan ** Fee: Per current feeschedule($1,208) h. Street Tree: By Developer ** Based on the latest effective PG&E rate schedule approved by the PUC Bonds: - Faithful Performance Bond: 100% of Off-site and On-site Improvements - Labor & Material Bond: 100%of Off-siteand On-site Improvement - On-site Grading Bond: 100% of site improvements. The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee sch ed u I e. 28. TRASH, RECYCLYI N G A N D COM POST EN CLOSU RES Trash enclosure plans must be designed in accordance with the City's Public Works Guidelines posted at www.cupertino.org/nowaste, and to the satisfaction of the Environmental Programs Manager. Clearance by the Public Works Department is required prior to obtaining a building permit (CMC 9.18.210 (H) & (K)). Draft Resolution ASA-2017-05 October 26,2017 Page 11 29. OPERATIONS& MAINTENANCEAGREEMENT Developer shall enter into an Operations & Maintenance Agreement with the City prior to final occupancy. The Agreement shall include the operation and maintenance for non-standard appurtenances in the public road right-of-way that may include, but is not limited to, sidewalk, pavers, and street lights. 30. UNDERGROUND UTILITIES Developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate with affected utility providers for installation of underground utility devices. Developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and theDirector of PublicWorks. 31. TRA N SFORM ERS New electrical transformers, telephone cabinets and similar equipment shall be placed in underground vaults. The developer must receive written approval from both the Public Works Department and the Community Development Department prior to installation of any above ground equipment. Should above ground equipment be permitted by the City, equipment and enclosures shall be screened with fencing and landscaping such that said equipment is not visible from public street areas, as determined by the Community Development Department. Transformersshall not belocated in thefront or sidebuilding setback area. 32. WATER BACKFLOW PREVENTERS Domestic and Fire Water Backflow preventers and similar above ground equipment shall be placed away from the public right of way and site driveways to a location approved by the Cupertino Planning Department, Santa Clara County Fire Department and thewater company. 33. BEST MANAGEM ENT PRACTICES Utilize Best M anagement Practices (BM Ps), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in grading and street improvement plans. 34. EROSION CONTROL PLAN Developer must provide an approved erosion control plan by a Registered Civil Engineer. This plan should include all erosion control measures used to retain materialson site. Erosion control notesshall bestated on theplans. Draft Resolution ASA-2017-05 October 26,2017 Page 12 35. WORK SCHEDULE Every 6 months, the developer shall submit a work schedule to the City to show the timetablefor all grading/erosion control work in conjunction with this project. 36. TRA FFI C CON TROL PLA N The developer must submit a traffic control plan by a Registered Traffic Engineer to be approved by the City. The plan shall include a temporary traffic control plan for work in the right of way as well as a routing plan for all vehicles used during construction. All traffic control signs must be reviewed and approved by the City prior to commencement of work. The City has adopted Manual on Uniform Traffic Control Devices (M UTCD) standards for all signage and striping work throughout the City. 37. STREET TREES Street trees shall be planted within the Public Right of Way to the satisfaction of the Director of Public Works and shall be of a type approved by the City in accordance with OrdinanceNo. 125. 38. FI RE PROTECTI ON Firesprinklersshall beinstalled in any new construction totheapproval of theCity. 39. SANTA CLARA COUNTY FIRE DEPARTMENT A letter of clearance for the project shall be obtained from the Santa Clara County Fire Department prior to issuance of building permits. Clearance should include written approval of the location of any proposed Fire Backflow Preventers, Fire Department Connections and Fire Hydrants (typically Backflow Preventers should be located on private property adjacent to the public right of way, and fire department connections must be located within 100' of a Fire Hydrant). 40. FIRE HYDRANT Fire hydrants shall be located as required by the City and Santa Clara County Fire Department as needed. 41. CALIFORNIA WATERSERVICECOMPANYCLEARANCE Provide California Water Service Company approval for water connection, service capability and location and layout of water lines and backflow preventers before issuanceof a building permit approval. Draft Resolution ASA-2017-05 October 26,2017 Page 13 42. DEDICATION OFUNDERGROUND WATERRIGHTS Developer shall "quit claim" to the City all rights to pump, take or otherwise extract water from the underground basin or any underground strata in the Santa Clara Valley. 43. SAN ITARY DISTRICT A letter of clearance for the project shall be obtained from the Cupertino Sanitary District prior to issuanceof building permits. 44. UTILITY EASEMENTS Clearance approvals from the agencies with easements on the property (including PG&E, AT&T, and California Water Company, and/or equivalent agencies) will be required prior to issuanceof building permits. 45. WASTE TRIO AN D CIGARETTE BUTT URN Waste trio and cigarette butt urn manufacturer specifications must be provided to the Environmental Programs Division for review. Location of waste trio must be located entirely on private property and in proximity to pedestrian use of the sidewalk. Clearance by the Public Works Department is required prior to obtaining a building permit. 46. STORM DRAINS All exterior storm drain inlets on the parcel must be fitted with full trash capture storm drain catch basin inlet devices to prevent litter from entering the storm drain system. Devices installed must be approved by the California State Water Board and selected from the San Francisco Bay Regional Water Quality Control Board list, which can be viewed at http://www.sfestuary.ora/a�proved-trash-capture-devices. Please includewith the resubmittal, the manufacturer specification sheet for all trash capture device(s) included with the project. As a condition of approval, the devices must be installed and maintained (cleaned) in accordance with the manufacturer specifications, but not less than two times per year. The property owner must provide official written record of cleaning and maintenance to the City upon req u est. 47. STORM DRAIN INLET MARKERS All exterior storm drain inlets on the property shall be clearly marked with "No Dumping Flowsto Creek" or "No Dumping Flowsto Bay" markers. Draft Resolution ASA-2017-05 October 26,2017 Page 14 48. COPPER U SES PROH I BI TED Copper metal roofing, copper granule containing asphalt shingles, copper gutters and downspouts, and/or other exterior ornamental copper are not permitted for use on any commercial or industrial building. 49. C&D WASTE MANAGEM ENT PLAN A completed C&D Waste Management Plan must be submitted at the time of building permit issuance. If the applicant and/or their contractor and any subcontractor working on the project self-hauls the C&D material, a Waste Management Report must be submitted prior to final approval of the building permit demonstrating a minimum of 65% of the C&D waste has been diverted from landfill and recycled. Please note that C&D debris box service may only be obtained from Recology, the City'sfranchised waste hauler. C&D Recycling information and reportsmay beviewed atwww.cupertino.org/qreendev. 50. RECOLOGY REVIEW The location, path of travel, and associated design features of the on-site trash enclosure will be required to be reviewed by Recology, the City's franchised waste hauler, and approved by the Public Works Department prior to building permit i ssu an ce. SECTION V: CONDITIONSADMINISTERED BYTHEBUILDING DEPT. 51. ACCESSIBLE PATH OF TRAVEL The applicant shall provide accessible path-of-travel from the building to the trash enclosure per 2016 California Building Code. SECTION VI: CONDITIONS ADMINISTERED BY SANTA CLARA COUNTY FIRE D EPT. 52. FI RE SPRI N K L ERS Certain structures may require fire sprinkler coverage under exterior roof overhangs. SL�ch areas must be reviewed by a properly licensed contractor. If thefire sprinkler system is to be modified, a State of California licensed (C-16) Fire Protection Contractor shall submit plans, calculations, a completed permit application and appropriate fees to the Santa Clara County Fire Department for review and approval prior to beginning their work. 53. CON STRU CTI ON SI TE FI RE SA FETY All construction sites must comply with applicable provisions of our Standard Detail and S�ecification SI-7 and Chapter 33 of the currently adopted edition of the Draft Resolution ASA-2017-05 October 26,2017 Page 15 California Fire Code. This must be submitted to and approved by this office prior to commencing any demolition/construction activities. 54. PU BL I C FI RE H YD RA N T(S� REQU I RED Identify the location of the existing public fire hydrant(s). Maximum hydrant spacing shall be 500 feet, with a minimum single hydrant flow of 1,750 GPM at 20 psi, residual. Fire hydrants shall be provided along required fire apparatus access roads and adjacent public streets within 100' of the fire department connection (FDC). 55. WATER SU PPLY REQU I REM EN TS Potable water supplies shall be protected from contamination caused by fire protection water supplies. It is the responsibility of the applicant and any contractors and subcontractors to contact the water purveyor supplying the site of such project, and to comply with the requirements of that purveyor. SUch requirements shall be incorporated into the design of any water-based fire protection systems, and/or fire suppression water supply systems or storage containers that may be physically connected in any manner to an appliance capable of causing contamination of the potable water supply of the purveyor of record. Final approval of the system(s) under consideration will not be granted by this office until compliance with the requirements of the water purveyor of record are documented by that purveyor as having been met by the applicant(s). 56. ADDRESSIDENTIFICATION New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visiblefrom the street or road fronting the property. These numbers shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. N umbers shall be a minimum of 4 inches(101.6 mm) high with a minimum strokewidth of 0.5 inch (12.7 mm). Draft Resolution ASA-2017-05 October 26,2017 Page 16 PASSED AN D ADOPTED this 26th day of October, 2017 at a noticed Public Meeting of theAdministrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino M unicipal Code Section 19.12.120. ATTEST: A PPROV ED: EI I en Yau Ben j am i n Fu Assistant Planner Asst. Director of Community Development CITY OF CUPERTINO 10300 TorreAvenue Cupertino, California 95014 DRAFT RESOLUTION OFTHEADMINISTRATIVEHEARING MEETINGOFTHECITYOFCUPERTINO TO ALLOW TH E REM OVAL AN D REPLACEM ENT OF 14 PROTECTED TREES TO FACI LITATE TH E CON STRUCTI ON OF A N EW COM M ERCIAL BAN K BRANCH AND ASSOCIATED SIDEWALK IMPROVEMENTS A T 21020 H O M ESTEA D ROA D (A PN 326-07-020) SECTION I: PRO,�CT DESCRIPTION Application No.: TR-2017-39 Applicant: Whitney Marr (Gensler) Location: 21020 Homestead Road (APN 326-07-020) SECTION II: FINDINGS WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an application for a Tree Removal Permit asdescribed in Section I of this Resolution; and WHEREAS, the project is categorically exempt from the California Environmental Quality Act (CEQA); and WH EREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and theAdministrative Hearing Officer has held at least one public meeting in regard to theapplication; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, theAdministrativeHearing Officerfinds: 1. That the tree or trees are irreversibly diseased, are in danger of falling, can cause potential damage to existing or proposed essential structures, or interferes with Draft Resolution TR-2017-39 October 26,2017 Page 2 private on-site utility services and cannot be controlled or remedied through reasonablerelocation or modification of thestructureor utility services; The on-site trees were evaluated for their health and their retention suitability and in most cases the health of the tree determined their suitability for retention. No trees were determined to be in good health and have good structural stability. Of the 14 proposed removals, only three trees were evaluated with an above average health rating. These three Mexican fan palms (Washingtonia robusta,) unfortunately were rated with a poor retention suitability as the palms are located where the required stormwater control facilities are proposed and the species is typically not designed to thrive in these areas. The other protected trees evaluated were determined to be declining in health and/or have structural defects that cannot be abated with treatment and would require significant management that may still yield a limited lifespan. N OW, TH EREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, theApplication No. TR-2017-39, is hereby approved; and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the public hearing record concerning Application TR-2017-39 as set forth in the Minutes of the Administrative Hearing Meeting of October 26, 2017, and are incorporated by reference herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPM EN T DEPA RTM EN T 1. A PPROV ED EXH I BI TS Approval is based on the arborist report entitled, "Arborist Report, Project #5173.00," p repared by ,�ke M i n n i ck of H M H (#W E-11830A), d ated October 2, 2017 consisting of twelve (12) sheets inclusive of a landscape plan; except as may be amended by conditions in this resolution. 2. CONCURRENTAPPROVAL CONDITIONS The conditions of approval contained in file no. ASA-2017-05 shall be applicable to this approval. 3. TREE REPLACEM EN T SPECI ES The applicant is required to plant, at a minimum, a medium-sized shade tree in the public plaza to the satisfaction of the City in consultation with the City's consulting arborist. Draft Resolution TR-2017-39 October 26,2017 Page 3 4. TREE REPLA CEM EN T SI Z E The applicant shall provide adequate tree replacements for trees proposed to be removed in conformance to the replacement guidelines per Cupertino Municipal Code Section 14.18.160. The size of the proposed replacement trees shal I be mod ified as follows to be consistent with the City's Protected Tree Ordinance unless deemed infeasibleby theCity'sConsulting Arborist: a. Diameter of trunk size of removed tree up to 12 inches shall be replaced with one24-inch boxtree; b. Over 12 inches and up to 36 inches shall be replaced by two 24-inch box tree or one 36-i nch box tree; and c. Over 36 inches shall be replaced with one 36-inch box tree. If it isdetermined that it isphysically not feasibleto plant the required replacements trees, the Applicant may pay in-lieu fees determined to be appropriate by the Community Development Director. 5. A RBO RI ST REV I EW Prior to building permit issuance, the number, location and species of trees shall be reviewed and approved by the City in consultation with the City's Consulting Arborist. The replacement trees shall be planted prior to building permit final. The Applicant shall provide the Department of Community Development adequate documentation, including, but not limited to, photographs, receipts or invoices, to verify that replacements have been planted. The City's consulting arborist shall inspect the trees after planting and a report ascertaining the good health of the trc2S mentioned above shal I be provided prior to issuance of final occupancy. 6. PROTECTED TREES The applicant understands that the replacement trees may not be removed without a Tree Removal Permit and that they shall be responsible for ensuring the proper maintenance and care of the trees. The applicant shall also disclose the location and species of all replacements trees on site upon sale of the property. 7. I N D EM N I FI CATI ON Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the City, its City Council, and its officers, employees and agents (collectively, the "indemnified parties") from and against any claim, action, or proceeding brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant to attack, set aside, or Draft Resolution TR-2017-39 October 26,2017 Page 4 void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant shall pay such attorneys' feesand costswithin 30daysfollowing receipt of invoicesfrom City. �ch attorneys' fees and costs shall include amounts paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costsand any costsdirectly related tothelitigation reasonably incurred by City. 8. NOTICEOFFEES, DEDICATIONS, RESERVATIONS, OROTHEREXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest thesefees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AN D ADOPTED this 26th day of October, 2017 at a noticed Public Meeting of theAdministrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino M unicipal Code Section 19.12.120. ATTEST: A PPROV ED: EI I en Yau Ben j am i n Fu Assistant Planner Asst. Director of Community Development PROGRAM INFORMATION , ��� Ba n k of Amer�ca �� LOCATION INFORMATION HOMESTEAD ROAD ° 21020 Homestead Road Corner of Homestead and N. Stelling Roads Homestead Road Cupertino, CA 95014 (E) CITY STREET LIGHT r � r TF-DENO-GR (N) CURB CUT � ARC LENGTH: 62.97' NeW S O e 24'-0"WIDE � � R.O.W. DEDICATION TO THE CITY OF CU RTINO REL ATE 'I�I-f��QffAf�-�113:L�0(�TION FLAGSHIP m Z � m 21020 Homestead Road � CURVE • (7) OFFICES ~ 0 � • 3 ATM DAY 1 0 � � o , „ , RADIUS: 40.00� Cupertino, CA 95014 � � � � S 8 9 4 7 0 0 E 1 2 9.6 3 ; Z O N I N G I N F O R M A T I O N • (3) TELLERS W/ BR � GLASS � — � � Proposed Use: Bank � — � � I • (10) WAIT SEATING — � � _ — — � � SERIAL NUMBER: CA � '� I • 1 LG UCC � � � � � ) � ' , � �-� , Hours of peration. . - Thurs. - 2 ���, � i(����, ,I _�.�, � O Mon 9 5 � � � � NRSP VERSION: 2.0 • (2) SM UCC �o � � ���,� �%���� �RT ooNsiTE �� '� �04 ��`�,���� � �; Friday 9-6 • (1 ) WU N.D. � � ----- � y _ BULLETIN. 2017-3 o ------------- — � � — RECYCLING � , Aoo.52 � Saturda 9 2 ' I � � � � ����� Sunday Closed � � � � v ���:.� �� I i � I � —� � � �� � �� Number of Projected Employees : 13 ; � (E)2 x 20 � I � � \ � Number of Projected Users : To Be Determine SEMENT NEW N NEW � PACIFIC BELL �, MONUMENT SEWER � A � 2101 Webster Street � Suite 2000 s R��E ' � ��`�°� , — SITE REQUIREMENTS � � Gensler —�— � � Oakland,CA 94612 1 � � G��� Q� � Telephone: 510.625.7413 � I �AG Facsimile: 510.625.7499 �, SETBACKS - Title 19 : TRELLIAGE � I � \ SCREEN � � I ��� �' ',� Front Setback: 22 FT (building height). PLANTING � � ' � � � � � � �� � �;,;`�so � ��\ �^�� �, i � o 0 0 0 0 ' �� � � � � � � �';\ � � '�� �1 I � I �i� �l � o � �� �� �� �� �� �� ��� � � ,� , � . . . . � � '� � - - - - - � , , � � � o � ! ', I I I FEC � ' � � HEIGHT. � ------ -- � i � � � � � �� _____ __� _ _ � � � � Height Limit = 30' at Stelling Gateway Area I I , I I � � � � � Q I �� �8 Proposed Height = 22 + I I � � � �° � � � � � I � Proposed Number of Stories = One Story I I � ', ', 0 0 ', ', �, � � � �� I� PAVING AREA I I � � � " � � -----_ ___ -- - J I � ��II � I nIH 12,782 sf existing , I I � � � � , � I - � 1 V V �I � Issue Date&Issue Descri tion B Check � � � � I p u � �� � 15 730 sf proposed replacing all of the p y NEW � _ _ � _ _ � � � � ; [� � I � I I existin avin 62%of site as avin 01 08/31/2017 WM AH DISPOSITION OF (E) TREES �NDERGROUND � _ _ _ � � � I � � I UP I� I g p g' p g PLANNING COMMENTS#1 ELECTRICAL � I � I� � I I LANDSCAPED AREA 02 10/18/17 WM AH SERVICE � T I PLANNING COMMENTS#2 � � 203 sf corner landscaped area All existing site trees were deemed unsalvageable NEW � _ � o � o � I II 641 sf parking lot landscaping due to condition and unsuitable for TEL/DATA _ _ _ _ _ _ _ � I I proposed site uses - all current site trees SERVICE I � 24HR vEST. I 25'-2" SETBACK ' � 5,786 sf total I � o are planned to be removed. I � 23 /o of lot area �I � � � � � I� B KE PARKING - title 19 19.124: I � � � I P RKING (4) I I Z Proposed Building Size: 4172 SQ. FT. � I GM � I� I . N OT A PART O F T H I S S U B M ITTAL � � _ �GM � � � Space/sq.ft.: 250 per SQ. FTG. r I� � � y = 17 spaces reqd. D a � � ° _ _ _ _ _ _ _ _ = _ _ _ _ _ _ _ _ _ _ _ _ = _ _ _ _ _ ��� SIGNAGE DESIGN, LAYOUT, LOCATION OR _ _ �� m 33 spaces provided � � - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -Ti - - � sizE P RO POS K of AM E R I CA H B �P � � = (None are Compact Spaces) ° ° ° ° ° ° � � Bicycle spaces = 1 / 1250 sf bldg. � � 4 spaces reqd. at entrance TRELLIA E SCREEN � Accessible parking spaces required = 2 SD PLANTI G �--� � � � Q of which one is required to be a � 9 �� � � � van accessible parking space � 9�-��� o � � - - - WM � per CBC 11 B-208.3 � TYP. � � Foc o Q o � I� I Clean Air Vehicles per CAL Green � �� �� i � CLEAN CLEAN CLEAN �e PAR � �e I I 3 spaces required. z AIR AIR AIR (VAN) One full-folia�1 e tree for ever VEHICLE VEHICLE VEHICLE I y Y 5 parking spaces = 7 trees 4% of site dedicated to bio swale surFace as our new impermeable . � surface arkin lot is 10 000 sf �� �� P 9 � iil ,I I N COVERED TRA EN OSURE AD TH RAISED ACCESSIBLE PATH TO � i � L E G E N D � ) � (N) CONCRET PR TRASH ENCLOSURE � � P RO POS E D PARKI N G � ' � N o � N so (E) STORM DRAIN ao � TO REMAIN � � � o i I I o (E) CITY UTILITY POLE ao � � � "' � TO REMAIN � �� NEW PARKING LOT RECOLOGY i � LI G HT STAN DARD TRASH B�NS LOCATIONS 02 0 Sp �I � (E) PROPERTY LINE A00.52 � TRASH LOADING 12 ❑ I Seal/Signature (E) CHAIN LINK FENCE � � � I GM (N) GAS METER LOCATION �� � I — — — — — — — —UNDERGROUND UTILITY I � � SERVICES � REMOVE (E) ELECTRICAL TRANSFORMER REPLACE WITH UNDERGROUND TRANSFORMER S.E.D. ��\ I I � EXI STI N G S ITE U S ES S89°47' 134.18' + II I I Pro�ect Name GO gle Maps 21020 Homestead Rd � I Bank of America - Homestead Road �� �,.,„�,,::,,o Existing Office Building 5265 sf _ `"'"°`°�'_° - iy68o2� Existing Uses include: Chiropractors, I prototype Layout c � . �' a '1 0 , � � = sS��� Beauty Salon & Massage Therapist ._ .� , e:erop - � ' ? o *�'�,Q � � 9 I CAD File Name , ,,.,,,,V�o, a � � ' 3" Existing Building Height 14.8' MEDIUM � � � R =W����;%.�. Existing one-story building - ; } � = ° - - _ 33.2502.002 . ���,eai � r'wye rammead � � � ,�., � _ _ , ,��,�.,,s�` I Description _ �3�030Nsiw0��dNetl - ����-�����j�����a��� SMorta aternxo R.O.W. R E Q U I R E M E N TS PROPOSED SITE PLAN '�.. - TlreMorMnam RoxsD��ftlbrl.�ifO $a�Owoy Q Q/IOmHIl00 Hq�$Ch001 PpehmpMf� er���meio.�n�ey� - vu cnurcn ,� kr O Cw.rtmor=: Jun ro Serre f+n I be �, - � Dedication of 10'-0" Wide Ri ht Of Wa strip at Scale J Y ,. :... .:D =. _. n.oic amaoe0 . � � , �p,,,�„�,�,� each public way for City Sidewalk and m � ���,0 10�_ �� � � planting strip. Applicant provides plat map, �� 0 •1:i � � ,, c ; ..�yc c •rr,,, �-�����y��.��� Go gle . � ; , ROM CU B, TYP. City will write the dedication. 10'-0" from � 2' 4' 8' 16' "'' � face of existing street curb. � � �0 O ■ �O Ref. North (E) BUS STOP VICINITY MAP 2 PROP,OSED SITE PLAN � ALE. 1 1 F.A. R. CALCULATION , ��� Ba n k of Amer�ca �� HOMESTEAD ROAD ° ZONED: P(CG) Homestead Road APN: 326-07-020 New Store Parcel B Existing Lot Size: 25,422.15 SQ. FT. From (E) Survey 21020 Homestead Road (N) Street Easment: - 1 ,259.04 SQ. FT. (subtract) Net Lot Size: 24,163.01 SQ. FT. Cupertino, CA 95�14 ---- - \ � � - - - ---- - - - _ - _ - � � Building Size: 4172 SQ. FT. I I - - - - - - � � - — \` Net Lot Size: 24,163.01 SQ. FT. SERIAL NUMBER: CA � �� � NRSP VERSION: 2.0 I � i I � �� � � i � \ REIO 0 LSNG \ \ � FAR: 17 BULLETIN. ZO 1 / -3 \ . , \ � � �� � Proposed Use: Bank I i � I � � � I (E)2 'x 20' ELECTRICAL I � � � � � SEMENT FOR � PACIFIC BELL � 79�-0�� � � � 2101 Webster Street � � � Suite 2000 ������� Oakland,CA 94612 � Telephone: 510.625.7413 \ � Facsimile: 510.625.7499 �� \ � � � I , � / SD I \ 1 / `,�� , ; , � �' �ii i ��� � ' � � I �� Issue Date&Issue Description By Check � II I 01 08/31/2017 WM AH I I� I PLANNING COMMENTS#1 I � 02 10/11/17 WM AH PLANNING COMMENTS#2 I �� I I I 0 , 0 N � � z � ,� � � � � � �- m , , � � ,� � � i � ' Zo�-6�� G7 so � I � I 0 I WM � I Foc Pi �� 4 � — CLEAN CLEAN CLEAN AIR AIR AIR II I VEHICLE VEHICLE VEHICLE I III I � i� I I o , I II N SD I I I� I I � I I� � I SD Seal/Signature � I I I� I I � � I �I I I Project Name � � I Bank of America - Homestead Road � �� � �I�I Prototype Layout MEDIUM ICAD File Name 33.2502.002 IDescription SITE DIAGRAM FOR FAR CALCULATION I Scale 0 2' 4' $' �6' � � �0 0 ■ � � Ref. North KEY NOTES . ��� BankofAmer�ca �� � Homestead Road New Store 21020 Homestead Road �ETA� PA�E� Cupertino, CA 95014 ROOF OVER WOOD STRUCTURE � � � SERIAL NUMBER: CA NRSP VERSION: 2.0 BULLETIN: 2017-2 coNCRETE APRON 2101 Webster Street G e n s I e r Suite 2°°° Oakland,CA 94612 Telephone: 510.625.7413 Facsimile: 510.625.7499 0 S�OPE � 1 4 PER FT. � �EVE� CONCRETE S�AB 03 A00.52 � � � � z I Issue Date&Issue Description By Check Q � 01 08/31/2017 WM AH � � � PLANNING COMMENTS 0 0 �2 —� TRASH ENCLOSURE ROOF PLAN � COVERED TRASH ENCLOSURE PLAN 2 SCALE. 1/2 —1 0 O SCALE. 1/2 —1 0 0 OPEN SPACED REDWOOD SIDING A�� 4 SIDES OPEN PAINTED STEE� DOORS ELEVATION TRASH ENCLOSURE O3 . SCALE: 1/2"=1'-0" Seal/Signature 1'-0" GRADE PRECAST CONCRETE WALL EDGING W/SKATEBOARD I Pro�ect Name DETERRENTS Bank of America - Homestead Road , .� � Prototype Layout -...,... . _�,��„�,�. �.....� . " MEDIUM � � CONCRETE SEAT I CAD File Name ' WALL AT STREET CORNER 33,2502.002 IDescription `� SITE DETAILS � ,�""'r ..�,.�_ __ _,i�, PRECAST LEDGESTONE I sca�e AS INDICATED � � WALL FACING: CORONADO ,.�..;� �_ PROLEDGEOAKBROOK t WALKWAY / A00 . 52 Ref. North SEAT WALL FACING MATERIAL SEAT WALL O4 SCALE: NONE DT MW 0086 SCALE: 1 1/2" = 1'-0" DT MW 0086 . ��� I� BankofAmer�ca 0 , Homestead Road 385��-0�� New Store 21020 Homestead Road - �E�r��1�E R�a� Cupertino, CA 95014 Qo O HOMESTEAD ROAD SERIAL NUMBER: CA i NRSP VERSION: 2.0 � D BULLETIN: 2017-3 m Z m I S89°47'00"E 129.63' � - - - � ' LECTRICAL � � � EAS ENTFOR Z � I PACIFIC�F�LL �� I � � o � � � � � 2101 We ster Street �� , � � Suite 2000 i i ������� Oakland,CA 94612 � � � Telephone: 510.625.7413 � \ Facsimile: 510.625.7499 � � � � � � � � i i � � � U �� �yll8 � 3 Nf/� T � � � OI � Issue Date&Issue Description By Check � 01 08/31/2017 WM AH � � , PLANNING COMMENTS#1 � � 02 10/18/17 WM AH PROPOSED BANK of AMERICA BRANCH BANK -� _ W PLANNING COMMENTS#2 0 0 0 0 0 0 0 0 0 � �, � � � o � _ Z Z ' I CLEAN AIR VEHICLE � � (VAN) I PROPOSED PARKING I � o _ �, � M W X � ` Q � S� �II � I S89°47'00"W 134.18' � � 824SS w26 93, I I I CONTROLLED INTERSECTION 7-2 PASSES � SCALE: 1/16" = 1'-0" ISeal/Signature � � IProject Name Bank of America - Homestead Road I IPrototype Layout MEDIUM ICAD File Name 33.2502.002 IDescription SITE DISTANCE DIAGRAM I Scale p 4' 8' 16' 32' A O 0 ■ �� � Ref. North � EXTERIOR FINISH SCEDULE . ��� STUCCO / PLASTER BASED ON PAREX STUCCO Ba n k of A m e r i ca �� � ) �, [BAC PRESCRIPTIVE] /"BASIS OF DESIGN" ST-1 10409"TUNDRA",SAND FINE FINISH Home stead Road ST-2 10432"WARM SAND,"SAND FINE FINISH ST-3 10447"MOSS",SMOOTH FINISH ALUMINUM COMPOSITE METAL PANEL New Store [BAC PRESCRIPTIVE] /"BASIS OF DESIGN" ACM-1 "BRITE RED" #4MMBTR ACM-2 "RVW WHITE"#3MM4RVW 21020 Homestead Road ACM-3 "MATCH STOREFRONT" Cupertino, �A 95�14 - GLAZING [BAC PERFORMANCE] +20'-0"� GL-1 1"HEAT STRENGTHENED CLEAR INSULATED GLAZING T.O.PARAPET GL-2 1"TEMPERED INSULATED GLAZING +18'-0" T.O.PARAPET GL-3 1/2"TEMPERED MONOLITHIC GLASS SERIAL NUMBER: CA � 'QQ GL-4 5/8"TEMPERED MONOLITHIC GLASS NRSP VERSION: Z.O � ���� � Q`�Q�° � ALUMINUM GLAZING FRAMES BULLETIN: ZO17-2 [BAC PRESCRIPTIVE]/"BASIS OF DESIGN" 21 O2O AF-1 CURTAINWALL SYSTEM ACM-1 AF-2 STOREFRONT SYSTEM �� / � � / � � STUCCO ACCESSORIES (ALL PAINTED EXPT-3) - SA-1 WIDE CHANNEL SCREED SA-2 NARROW CHANNEL SCREED SA-3 MODIFED CHANNEL SCREED 2101 Webster Street /� � � � Suite 2000 / , METAL COPING [BAC PERFORMANCE] Oakland,CA 94612 G e n s I e r Tele hone: 510.625.7413 MC-1 PREFNISHED METAL COPING CUSTOM COLOR:TO MATCH ST-3 p Facsimile: 510.625.7499 0o EXTERIOR PAINT [BAC PRESCRIPTIVE]/"BASIS OF DESIGN" +a�_o„ FINISH FLOOR EXPT-1 [N185]COLOR:HC-102'CLARKSVILLE GRAY',MATCHES ST-3:MOSS EXPT-2 [N185]COLOR:HC-80'BLEEKER BEIGE',MATCHES ST-2:WARM SAND EXPT-3 [N185]COLOR:CLASSIC#1039'STONE HOUSE',MATCHES ST-1:TUNDRA ST-2 ST-1 EXPT-5 [P25]COLOR:#2133-50'PIGEON GRAY' (BASED ON BENJAMIN MOORE) NORTH ELEVATION - HOMESTEAD ROAD � SCALE. 3/16 1 0 EE 01 I /� Issue Date&Issue Description By Check �� +zz�_o° 01 08/31/2017 WM AH T.O.PARAPET PLANNING COMMENTS +20�-0"� MC-1 MC-1 T.O.PARAPET +18'-0" T.O.PARAPET ,' ■ '`� � �'�� ' Ban k of Amer�c� � BankofAm rica I ACM-1 C ACM-1 � � x /r � / / - � .� i r 00 00 \ / � 0 +o,_o„ �` , / FINISH FLOOR ( ST-2 � ST-1 TRELLIAGE SCREEN PLANTING WEST ELEVATION - SIDE 2 EAST ELEVATION - N . STELLING ROAD SCALE. 3/16 - 1 0 E E 01 SCALE. 3/16 1 0 E E 0 3 � +22'-0" ` T.O.PARAPET / MC-1 - +,s�-o° � T.O.PARAPET B n k of America ' ACM-1 f � � � Seal/Signature 0 \ / +�,_�,. FINISH FLOOR ST-2 TRELLIAGE SCREEN PLANTING IProject Name Bank of America - Homestead Road SOUTH ELEVATION - REAR 4 NOT A PART OF THIS SUBMITTAL SCALE. 3/16 - 1 0 E E 01 Prototype Layout MEDIUM BUILDING SIGNAGE SHOWN FOR INFORMATION ONLY - I CAD File Name BUILDING AND SITE SIGNAGE UNDER SEPARATE CITY 33.2502.002 APPROVALS. I Description EXTERIOR ELEVATIONS Isca�e 3116"=1'-0" 0 2� 4� $� A09 . 11 . ��� a n k of Amer�ca � Homestead Road New Store 21020 Homestead Road Cupertino, CA 95014 SERIAL NUMBER: CA NRSP VERSION: 2.0 BULLETIN: 2017-2 2101 Webster Street G e n s I e r Suite 2°°° Oakland,CA 94612 Telephone: 510.625.7413 Facsimile: 510.625.7499 I � Issue Date&Issue Description By Check � +18-0 ROOF +'s�-o°� 01 08/31/2017 WM AH T.O.PARAPET ROOF TOP T.O.PARAPET TOP PLANNING COMMENTS UNIT UNIT +11'-0" � � BOT.OF CANOPY ■ ■ ■ ■ TRELLIAGE ; SCREEN : I ' PLANTING : ■ � � TELLERS BANK INTERIOR OFFICE � D R I V E WAY � +o�-o�� � � FINISH FLOOR SIDEWALK HOMES EAD RD. w z J d � � d TRANSVERSE SECTION THRU HOMESTEAD ROAD � SCALE: 1/8" = 1'-0" ��� +22'-0" � T.O.PARAPET �1+18'-0" � T.O.PARAPET ROOF ROOF DISH TOP TOP � UNIT I Seal/Signature ■ +11'-0" • BOT.OF CANOPY ■ ■ TRELLIAGE � � r SCREEN ; , � � PLANTING : BREAK - � ATM I - • ELECT. NETWORK ROOM OFFICE BA K INTERIOR � , � DRIVEWAY i ` +a�-o° � � FINISH FLOOR � w 24 HOUR VESTIBULE SIDEWALK N. STELLING RDo I Project Name z I J Bank of America - Homestead Road a � UNDERGROUND a ELECTRICAL TRANSFORMER I Prototype Layout MEDIUM ICAD File Name 33.2502.002 IDescription BUILDING SECTIONS Isca�e 118"=1'-0" 0 2' 4' $' �6' A09 . 15 LONGITUDINAL SECTION THRU N . STELLING ROAD R � SCALE: 1/8" = 1'-0" ■r� � . ��� PLANT LEGEND B nk f Am r� �� a o e ca � SYMBOL QTY. SIZE BOTANICAL NAME COMMON NAME SPACING/ NOTES TREES Homestead Road S4 G1 G1 G3 G3 G� G1 T1 5 24 Acerrubrum 'Autumn Blaze' Red Maple -- � � � G3 G3 G� ��� ���y.� i 1 i - - - _ 6 - - - - - - - - - - ` T2 2 24 Zelkova serrulata 'Green Vase' Sa❑leaf Zelkova Tree Grates in Side❑alk Area i/ _ �, - i I - - - - - - - - - - - - - - \ - - - - - - - - - - - - - - - - - - % I - - - - _ i T. � �.� � _ -� _ :.�►. �►� T3 9 24 Lagerstroemia 'Tuscarora' Crape Myrtle -- S4 S6 - - - - J - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ��� '�► �►` O� � � 21 0 H mestead Roa \ -- - - - - - ' __ ,�_ __ _ G1 S5 T3 Cupertino, CA 95014 SHRUBS � - -- - - -- � ; �r'� � ' �- _ --- - -- -- - -� ` i `. � � y �� � � T3 \__ � S1 14 5 Osmant❑us ❑eteropCyllus 'Variegatus' Holly Leaf Osmanti lus Spaced ❑ 48" o.c. max. / � i � �^ i � � �-__ _ _ i �� � ���� ��� � S5 � I i � � � i / � 'i . . � � � l� . S2 12 5 Loropetalum c�nense 'Burgundy' CC�nese Fringe Floi ier -- � �� �/ � � ��• : �� � � � �� � SERIAL NUMBER: CA � � � � � � � � � � � � � �`7 ' � G5 ► , � , • � ; := ►- ` ��� ,�� � '� ' % NRSP VERSION: 2.0 �� S3 17 5 Nandina domestica 'Gulfstream' Heavenly Bamboo Spaced i 36" o.c. max. �� C� i i i ��� ������� �� �� � . . - �► � � S4 18 5 Cistus -ybridus W�te Rockrose -- � < � `.:: ` �i►� ,i�- '-�_ � �� --�- � --------G3 _ � , _ ' --- . - - „ . � - �.- - � � � � �.:��� � . . �►` , � r , � � , , _ � � �.. ..� � � y _ T3 r � � � � � , ��� � � � ��- �� � . . , , S5 8 5 Ci ]amelaucium uncinatum 'Purple Pride' Geraldton Wax Flo-er - „�„��,,; � � � �� � � � � ►� ` �,�, � � �' �j _ � i � � � � � � �� � ��►� � �y'L/ h, � �� � /�� � j��,,�� � S6 ��A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� �A1 I�� ��� � ►�� � ����`�'� �4 ��f " � 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 � � � � � � S6 11 1 Coleonema pulc❑ella 'Sunset Gold' Breat�of Heaven -- GZ -� � ��^�, � %i����i�����i�����i�����i�����i�����i�����i�����i�����i�����i�����i�����i�����i�����i�����i�����i���' 'r►' 'f►' ��� �/� �` 2101 �N�+��s \\ �._�` , � l�Z/� r"� � , GRASSES/ PERENNIALS/GROUNDCOVER/VINES ��. � � � �� � � Webster Street �� ; � s � � ��"�� ; ; G4� ' �� � �� � ' � %��, � Suite 2000 '��^�, � i S3 G6 � � G6 = , ��� � �, ,` �\ � � _ , � � Oakland, CA 94612 ��"'��s � � �S 1 '���� ' � � � � Tele hone 510.625.7400 G1 35 1 Rosmarinus officinalis 'Prostratum' Rosemary Spaced � i 42" o.c. max. , �` % ` �j �► ������� p � ������,�; � ��r� �` , ��� '� '��� Facsimile 510.625.7499 , � = � �G7 .�► �►�► � : �: G2 160 1 MuJenbergia lind-eimeri 'Autumn Glon' Mudy Grass Triangular spaced ❑ 36" o.c. max. = �� � �' � � �� � � � � ����i►`� � � ► � ` � ����- �� ' � : : `��� �� � � � Landsca e Architecture: ��^�, � s �►i.��-�►• : �T �►� , p G3 11 5 P ormium 'Maori Maiden' Ne- Zealand Flax - � _----- � �� ' -- _�F�+����� ; s T3 - �:. �?�� �i►` ',' �� ' � "� ' � ' `� �� '"" ��� G3 Pa vement En ineerin lnc. � � � � � �� �� � g g � � �- � G4 65 1 Cotoneaster dammeri 'Lo-fasY Bearberry Cotoneaster Spaced ❑ 48" o.c. max. -���C��, � �� �'N�+�� � � �G7 � � � � � �` � You can ride on our reputation ,�,�,� � � �� � 3 ` � �. / G5 14 1 Coreopsis verticillata 'Moonbeam' TI readleaf Tickseed Spaced ❑ 24" o.c. max. ���"'�s ,� � � G6 � � Corporate Office.• � ��"'�, ; � � � � � � � G� • 3485 Sacramento Drive, Suite A ����,,���' ' � ���� Bl'1N K �� l'1M E R��{'1 � � � � � � , �%� San Luis Obispo, CA 93409-6095 ,, �.� G6 38 1 Tulbagi fa violacea Society Garlic Spaced ❑ 24" o.c. max. �,,���� � � � 805-�89-2265 � s ���i � � � �G7 � � � _ G7 12 1 Clytostoma callistegioides Violet Trumpet Vine -- �� �,�,,,,, � � � I � i � �� �, � G4 S6 � � , �`P1�''% �� � T3 Pa�ment EnLjneerinlJlnc. ;N�+��� , T� � � �� S6 � � � �G3 Attn: �nathan Edholm,Pro�ect Manal �r G2 � �� ���'�' � �G7 � ' � , 3�0 CCpress ❑riC� Suite 3 �� '�` � ' - ���; � s Petaluma,CA 94954 �� �N��� � X/ � � � � � T: 707-769-5330 '� � � , ��`�'�% ---- - ---- � � E-mail. 6nathane p C�mententineenn lcom � I ❑ a �N�+�" . ,� ;, .- �- b+e_� '�^�; � � ':-�.�,;,r:;:. Acer rubrum Autumn Blaze `a: 1 : . .: • ��.`Y ' ����.�'�'` White Robkrose ,��'�� , � T3 ` .� �� -c� . � � �'-�C'� Landscape Architect: Mike Wasden �� a� ,�� �e: :. �� , � � - i License: CA I 4669 E I �. 10 f31�O 1 I � � z a C� � � ��� : �, � ` �M j . Red Maple � �r ���� ,�-. ����,`�" I .: . ; ' _ , S '� �, �� � n `�r Y „�,. . `-. r�� ci - J� ., -cr` '� . t -... ; ' : �1 '7"3F � ^�'�'��. , �c� - "f '�7-� 5 �~-�`�.,• u;� ' Evergreen S�ub ' � '�x ,� �r -�.n ;r: h 3l., i... . � .�. . I y '4r...,.�� � Deciduous Tree �b,r ` T w� ,,r �.: -----, � � � ,,. �N� , � ��'� � ��� � ������ ��������� . . �`'�. '� g�_:= �� �.. ��"�� 4' �gC/8' �ide max. ❑ maturity(usually ��F��� V���� -- �.:. � - �G3 �,. xr�Sc �� �� � ��'��� �, . 6�� �Jn C�4�� �IIC�e � I'T1atUflt �, ���.. � i� �� ��-� � � � ����q�� � � � �� � _ / s � - p� . ,_ r�s r '� n :J �/ . �.� . �._ � _ ,�-� � � .�- - nrx � smaller, around 3 �gC by 5 ❑ide) % �� G7 � w ... � . � �'r� ��,, ��-�: s t..e, �•� �,_.,, �F�+��� G7 G7 G7 , � � � ; `�.. - _, ,� � -. ,�, � , � � � �; Regular � ater . .r V f , , � � .. �. , � , p�.. . � . �,�� � :��,.� ��� �,x, mal Cater „ �� � � � � � � 4..:, �... .. - -., . � � �. . _ ., Mini , , � � - i _. . _ .,, . . � T2 � �� T2 � � � : ��� .- _._. �.-•� ��^�,, �, .� , ,� -�_ , �_.�„r� ,�, �� ,' ,' . ���". ��" � � `� Moderate to Fast ro❑t�rate '` �+ '�„ ---- � . � � G1 � �^� „�::� 9 = ;� "�4 � � , _ ��: ; s : � ;..�- , '�-. � �'s _ . . -,.� Carefree s rub tolerant to d ougrt, ❑eat, � ���, � k _ � � _. � � �, �� �� � � �, � �� S2 � -z� � �;' �r; r �. �'':���' � poorsoils, uind '��'��� � �` `� 1 .� � Tolerant of �eavy soils or soggy ground �, � �• - ����; �I ! S6 � � �.� � .��� '���--� `�`4 .� (i.e. in drainage s❑ales) �<z . _ - � .;: � � �F��` � G6 �II� ' � � � f � �•� � �,,� ��' , W�te flo❑ers ❑/yello❑ centers in Spring, �� ���; , ,; ,,��I�,,, _ �"�� �� � r � ���� Summer ����� , y y ;�,� � y ;�� � ��� �s� , -G3 � � �; �� �.�.�� � � � �:.� Good sCade tree, brilliant red foliage in t❑e - � �� ���, il� S6 � I -- *� �- ...-�-� ,�,.. � � � �� CCemelaucium uncinatum Purple Pride' �� ��,�� �� � , � --�,."'�`:'�.�„� � ...�, Fal l. .� .� � -��.�:.,. Geraldton Wax Flower %��,�,���� �►.� i 'P°�- k A` ,rY;: ,.� . . .. .. � `'li I . . . . . .. . .. �' . _ `$-- . . _ :�. ,k . . , - t .r .--r" .�_. � � � .:�-.,. � / �.._ - . � � f.� , � ��}�k.� t r+�o": :� &�,,� _ �/ql�� -��� ,� I� , ��.�� >; x� 1� ���� ;�.'" :- Evergreen S�-ub �i .i► , - �,. � ..._ . _�* �,.s <<F"`� - `': .� � .�►� S2 __ - <�� . � _ .. ,... _ , �c, : "; � -- -G 1 a�', � -�� ,. � � � a i� � � � � ������% ��►� I � � � � , ���� ,��� 6' �gC/6' �ide _ maturity (can be kept to ��,,,,,,, �� � ._� � �s� � � ��-�,� �,�,� � � , � �, . � �� I 1 I Issue Date&Issue Description By Check �z �� �� � �'�� 4 -eig� ❑it❑regular pruning) ��N�+��� _ T1 �► I � �'���� - � • � _: / � �,� �� �\ �.:� � � ����3 � �� G2 � ������ ; �.►�' i - 01 5/26/17 MPW MPW �� Moderate ❑ater � �� fi , � Zelkova serrulata 'Green Vase' ^:- � �� � � � �'��� ' ,'��`3'��� ., ���"'�; I No � ,� � ,; � _ I� � � �i-�y,�,k' ,� r��- ,, , �; ���� � _: �'y�� >_ � � PnRKiNc - � ��� � �� ��.��<.,�r�.r��_ .�x�- Sawleaf Zelkova � . „ ,?u,� •:� � � � � � _ . � � � �� Pre Planning Submittal �� ��a��- �;�z �� `� �:� "�'� =�� '' Blooms in late Winter tCl-oug❑Spring, '�� ��"�% �� �-� � � � � 02 10/11/17 MPW MPW �,;. �- �, `������,,; � Deciduous Tree +„�, � �� � �:���'� covered in rosy pink to purple flo❑ers ������r�;; \ ��\ i\ _ ,�„ -�� f � _ , � � \�,�j \ � T3 / � � Planning Submittal#2 ,� ,� S2 � � ���?, � � S4 , `�? �`�-` "�"� 50' �g❑/30'to 40' ❑ide ❑ maturity =� , , ;N�+�� � I �'? � , �a�t^} �'� ,�� � Coleonema pulc❑ella Sunset Gold � � %� � -�c-�' r .. '''" ,�`a��f, ,��' �A''�t � �� ' � BI"@afll Of H@aV@l7 �i„� �� � ���� � � � �.�' � � ������ Moderate ❑ater � � ,n;��<„ ��, �� � � � � � � �' � �' ,�; � �� ��� �% � ���� � �� � �� �; - i �' ` � ��� '�` ���,�� � �.�+ Evergreen S�-ub � %% , ' ,�'`� - ,����� Moderate gro❑t❑rate ; � r,�';r��� t, � ,j r�����"'�� � � � ��� �, a r * , . .: �� , ..Aa- ='.r�"_`+^ti' ' �`c s..�.� ' i, ' r s`,-- � �6� �� i i �� 2' � ❑/4' ❑ide ❑ maturit �-,,,�����.� ; � T3 � � �' Tolerant of ❑eavy soils, droug❑t, ❑ind w=`�� � ',;� � � , � '��y g y ; � ��•,;ti. �`I s'� � �� ;/,q���,` i �� �• '��~ � �:��;�' " � � �' Moderate ❑ater - _ = S4 Not reported to be significantly susceptible � ' � �� '`' '�` i � � � .���'� �� . � � � S2 to est infestations or disease. � �� `" �+�'� i � ,,,� , p ,_� •_ ,�.n �;�. �� Yello❑-gold foliage year round❑tiny pink S2 � � _ � - .�.�A�.•�3 IZ 4`, c.J� i�xf I I �,, flo��ers in Spring ❑ Summer �' ���� p , � --�� �i'�Y a' 1'c�� 1] ". _ cn — - ' — _ _ . �� ?� . ;.� JG I .1. . �= Z_�. : � .� ... "'`�L � �-�� ' �w,.'�"" `�: ' ` ,�. ,�'���,: Rosmarinus officinalis 'Prostratum' - G1 / � , � t-. �R , 1 ti- � � .�a �f i��a. :: ;.� . .�K.- c.•FZ" .� I ' I � , - � � � �� � � :;; ,��,�� i� � + ;- Rosemary (Groundcover) I �I I d.. ' j� x� ._. . -_ - �����. � _ '���` .�;� � S2 T1 I � �, � I �` ,h � �...y .* � Evergreen Sa-ub ' � ro-4. 'j"< � I I / � � -, t� .:� � � -� � , � � S1 �i � i Lagerstroemia Tuscarora . � � ���..� t 2 �gC/4 to 8 spread ❑ maturity ,�= G3 �; , ,� ` � �,:� y ,}� i ' � i � ���K.�' Crape Myrtle � �;� 4 � -�-� � � „ � .' v , , r �, .. � � 1 1 , , � ° � i' / T T � i ;�� ��`� �.� � ��� ��#'� ����r� �'� �"' , •� Minimal to Moderate Cater /� "`"� � � �S2 - �f `-`� ���' Deciduous Tree � .ti� � �'� �� �w� � �.,� �� N'�w � :; � �� ' � - � �t �,� ti�'c� � sh xa�;`� a'F°�r ��s.:7 � � -� � � �, � 't � �� � "�1�., � r �. �� ��� �� 1�,-`�> -i, .���i, i, i, i, i, i, i, �i�„ ,�. , � _ , ,, ..-. ,� .� . � � ;�, , � � , , , , , , , , , , , , , , 'ri �+�i�i ��i�i .����Nyr—����i�i .����i�i .��44yr-. �i�i .����i�i�� �v�i�i .����i�i . �,,, � �a� � .�.. ; .� ,�. . ��.,,��., , , ,:�.,� Ver tou ❑ C�ard roundcover ��-, . �, . �, . �, . �, . �, . �, � �, . �, . ,�-, . ���, . ���, . ���, �� ,�� ,�� ,�� ,�� ,�� , �� ,�� �� ,�� ,�� ,�� ,�� ,�� ,�� , � ,� ,� ,� ,� ,� ,� ,� , �;� ,� , � �,�:..��: . � � Y 9 , Y 9 ; ; ; ; _� _� = = = = = --- G 1 , __ , �� �,�� �,�� �,� �,�� �,�� �,�� �, ��� �,�� �,�� �,�� �,�� �,�� �, � . �� � � ��:: t � ., , � � � � � � � � � � � � � � � � � � � � ',.� - �, , �'� •,•�._ � � • • � �r q , ,� �;,� r k� .-`� - � � � � � _ � � � � � _ > > ; ; % �- ; ,- �� — � '� -, - - - � � � � � � � � � � � � � � � � � � � � 20 � ❑/ 15 ❑ide ❑ maturit :� z - � � � � � � � - � � � � � � � - r �a.� �� �� �� �� �� � �� � �� �� �� �� �� �� � % � �.(,k . � � � � � � � � � � � � � � � � � � � � �- � � � � �- � , � , ,;,. �. ; . . .., . . . . . , �, ,_ � . . .,.. �.r�::� i 9 Y � �� � � , i \� \� \� \� \� \� \� \� :�"�F. \' \' \' \' \' \' \ \' \' \' \' \' \ ,- y �iAi� � i/� � i/� iAi� � i� � i� � ,'i/� , i/i� , i� , i/� , i/� , i/� , i/i� , i/� , i/� , i/� , i/� , i/, , i/� , i/� , i/� , i , i/, , ,�i/� , i/� , i/� , i/� Y� i i i i i i i i i i i i i i i i i i i i i , , . . .., . ., , . .. . . .. ,'':. . c. ,; . - o 0 0 0 ' ' 0/ / / 0/ / / / / (�/ / / (�/ (�/ / i, �/ (/ (/ (/ (/ (/ (/ (/ / / / . 0 0 0 0 � � � � � � i G � � � _. „ � � � � � � � � d d d d d d d d � \ \ \ \ \ \ \ � \ \ \ � � r 1 1 lr 1 1 1 � 1 lr lr 1 1 lr lr 1 li � r \ r \ r lr \ r \ r lr \ r 1 � r li \ i \ . , , _. , . . ,.,. . .,- � / / / i/ i/ i/ i/ i/ i/ i/ i/ i/ / \ r \ r \ \ r \ r \ i r \ r \ \ \ r \ r \ \ \ r \ \ \ \ \ \ \ \ \ \ \ �. � �� �. ,0%i�� ,0%i�� ,0%i�� /i� ,0/i� ,0/i�� ,0/i�� ,i, ,0/i� ,0/i�� ,0/i� ,0/i� ,0/i�� ,�/�i� ,i, i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i �1��� � Q.I t. �.,� �. f �.. \\ �1 / �1 / / �1 / �1 / �1 / �1 / \ / �1 �1 / �1 / �1 / �1 / 1 / \\\ ��\\� �.\\� �.\\� ��\\� �.\\� �.\\� . � �.\\\ ��\\\ �\\ ��\\\ ��\\\ �.\\\ ��\\\ ��\\\ �.\\ \\\ �/\\� �/\\� �/\\� �/\\� �/\\� �/\\� �,\\ �/\\� �\\\ �/\\� �/\\� �/\\� / r�''r�4 � ��.���� � - ��I' _ �1'.,:.��'� 4'I r �::' ` — �\��l�j\\���j\\���j` �j\\���j\\���j\\���j\\��/�\` ��j\\��l�j\\���j\\���j\\���j\\���j\\ �/� \ l J J j � � / \ j j j j j j j j i i -.�..�.�,:;.� < . - �; ��,• t.,� ��tt ��. ��; Lig❑t blue flo� ers from late Winter tCroug- .� - ; _ "_ = - = � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � ,�'� „ .�! _ - - - - - - - - - , � � � � � � � � � � � � � � � � = y � ° � ° � ° � ° � ° � ° � ° � ° � ° � ° � ° � � . ..t.��•. k -` �'i �"i � �"i � �"i � �"i � �"i � �i � � �i � � �i � �i � �i �i > i �i �i �i �i �i �i � i �i �i �i �i �i �i �i �i �i � i �i �i �i �i �i �i �i �i �i �i �i �i � �i- � ��•a �. �.�•`�.< r,.. !..�:::`:, � aU aU aU aU aU aU � �� ��� • �•�� • •�� ��� • i �1Li � �1Li � � i �1Li � �1Li � � 11 \� � , \�1l � \�1l \� � , \�1l � \�iG ,\�iG ,\�iG • I -'=,.:'�:: ,� . ,, � �-��— —� , - —, ,�- � � � � � � � ' � � � � � � � � � � ��. �r���.. �4+d� �� i� il ii.��'lii.� ii�� ii��� li+� �—'14+� q+�2--�+� 4+� q+� q+�2--�+��qi�� qi�� qi ; _ � , -. . , ;��, �,a f .� Moderate ❑ater - ��_ �.�� � �:� q ,•��� . Spring ��h �+����' � ����"��� ��-��� � � � `�,� �, � � ��� � � � �-���� _ � � � i Y / � �-� z, .. x , �� _ . :�� � �-�.� . "s: � � / - � . , . . � � o � .- _ : ,� �� w- �, � � � � �/ �,� � �,� � � _ � � Slo❑ to moderate groCt❑rate � � I � �i l ;,,a,.. „ c �`� �. -t��� � � � G2 G2 /�� �i� � � G3 �. ! -�- , i ,�;_,�. �. ��� Mu�enbergia lind-eimeri Autumn Glo❑ G2 � � � i ����� ��� " - -_ -� Tolerant of ❑eat�Tuscarora' ❑ybrid selected s''��� �,�,� ����,��i��� ''� Muhly Grass S2 � � �-� i �,,� " � for Cardiness ❑ resistance to milde❑ � ��'`� a��Y�; � -y�. - �_ ' I - �;�,,:_ �;���.� � t ,��j �R' Perennial Grass � ij� ; , : � #� - h� �- S�o❑y flo❑ers in Summer, Fall foliage color � " � ; i ` � � �� T3 / t _ a , - �° . �'= � " s , �` `�""���� �`` ' , i, r , •�`�"� 4' �gC/4' �ide (stalks may reac-to 5') % G1 .�... < < � , : '��, ., i � 1 �"`� ;x�� ' � i�i� 4 ��:`:� Minimal ❑ater � �'�o������'� � � Coreopsis verticillata 'Moonbeam' ,�� ,�� S4 S2 ■ ..- Osmant❑us ❑eterop❑yllus 'Variegatus' � `;�,'�-"�� t � � " £ � � ��"'y�°�,��}.>{��°t�Z. �. Threadleaf Tickseed q $'� 6 .. �} . � ` f ��i �A �\� � � � y O� i .� a h�\ �, d1ll .,,1 �: � �, ����[, � �1,I � y��� ;,, � "�� �,-` Holly Leaf Osmanthus ��' „ �� y �, � � Amber colored flo❑er stalks in Autumn '��`+.- � ` �'��„.; y4`� r?��"u�'��"' � e�ti+ {. .i s �i,�,�, t��-'' � � „x ' V �1, 7R�`d.itL,� ��� �'j� . � , , � , __ � 4,, , �- __,�}� , _ ,,,� Perennial ��•.'�'�✓° �. `�� �.r yk� r�:�� .+f*.._ " � i ��. �- \� r �: � "��' ' : ����- i .t` . � �?!�i' l� �,,y` 't . - yl4 . . i�n rr� .�.. sy�.. s .� ��,��> �; �,. - Evergreen Sa-ub ����I' q�� � ���' . Selected for on-site drainage s❑ale areas � -�►� � • �;�r . k ; 1�..✓�..Ai�i'� ,� �. r�. r� Ji f ,��/ %��� +',�., ��. 4,tif�l a` �� �� x : ♦ p A ;t�� ,� ,f �� .. ��� �'�s ;,- n,,,� , �r � ��sr F�,. � -:>�� 2' � C/3' �ide C maturit I 9 � � > q , � can survive in -et areas des ite minimal � 9 Y Seal/Si nature �h �� ":;� "��i�. ; �` ��'�� G2 "'`` ��` �'��' ���- � p - PRELIMINARY LANDSCAPE PLAN d�` '' `�, � , 8' �g❑max. / 10' �ide max. i� maturity _ ,... , ,_ ,. ', -ater reCuirement) ` '+i� `� '�+�. � 1 �h t.'A �� �'' �i �� ex-•,� ,�r.' i . �';`r��- �a�,;"�5%,�:;��� ;, ,�; ��.� (takes pruning - sCearing Cell for a 4 - 5' ,: .:+�> � Minimal to Moderate ❑ater 1"� 10' �� �'�����,�` ,� � �� tall -edge) ��� . P❑�rmium 'Maori Maiden' +� ,, NORTH z t,,� �.� . -.�,� ��;. Very toug❑plant, tolerant of droug❑t � ,�� `,�' �"���. � � � New Zealand Flax '�. I�" f ` Moderate � ater �� , ' � �.d.,�` ���'�;� ; ; , '�` �~ ' -� , � Pale yelloC flo❑ers from late Spring, into � ���_�..� • ;,�,��,�` ; � . ��,.�. � � ����'I ' Varie ated leaf color li ❑tens sCed areas ;��-�,;,� � ,I ' , .� Long-lived Perennial ,� ,o �� Summer ❑ early Autumn 9 9 Y f�>c- K w*:�+����;�F � , --� NOTES. � %�^��������' ,��� 4' �gC/5' �ide - maturity EXISTING LANDSCAPE PLANTING ❑ IRRIGATION SYSTEMS AT THIS SITE WILL BE REMOVED. ALL :�� ` ;pk` /� .x: , � M.,� -�- � ' � ti•-,� ..s��, ,''�`%,,� Tulba I�a violacea � �. - :� Loropetalum cC�nense 'Burgundy' ;.��. w- •``r'�.- � � g EXISTING TREES WILL NOT BE SALVAGED DUE TO POOR HEALTH AND/OR INCOMPATIBLE a.,�� � .w ,!Fr.�'�f'- :. '�'k`..� ...y 1" '`�`'►A� a.`� - -' ., j r =:. ' .' �!%,/' , Chinese Frin e Flower 4'� ' `'�;:� « :,f � �„ - �, �= ,. Society Garlic � ", r � :f �� �� ;� g ��., , t/ .�,tir'�i' -�� Minimal to Moderate ❑ater -:! � , ,� _ �� � LOCATION DUE TO PROPOSED SITE GRADING ❑ NEW DRAINAGE FACILITIES. READER S ATTENTION 'r�:�'+! �.� x' M � �:i%,,, ,�s �.�; , ;` � ';�'� � .. : +�J•'' `-0 � ������i�; � ��I�`'r IS REFERRED TO THE ARBORIST REPORT (PREPARED BY CAKE MINNICK, ISA CERTIFIED ARBORIST '' �- �.� � .�� ��•i Ever reen S�ub �'�~ -� ` 'y �� - l ���� � �� ,� � �� Perennial (from Rhizomes) �::�.; ,;.� �`�;,,,,�,� �, 1 �: J ��'" , .f � ,; ,� �.�f � 2 ❑ide strap-s-aped leaves in varying � . , � ,� � ' � ��� �����-. #WE-11830A), ACCOMPANYING THIS SUBMITTAL FOR ADDITIONAL INFORMATION ABOUT EXISTING �'•� i`� � ''� m ��`,�,''"`"'� ��`��� sCades of color, c�efl bronz red, cream ❑ � , ,, �, ����!� '� ��;L Pro ect Name �,,•,,, �a,....... '-.:. , J , . � Y Y � � . ��'� , F „ _ TREE SPECIES ON SITE. I 1 �:.�"��` ::';• ,,�``?��: 4 � ❑/6 ❑ide max. C maturit takes � �� `, � � 1 ;� � , .� ���, P¢�; 18 C�g�C �ide _ maturity ,:.y^ . ,;N:S�:�-;•w,.;_4. 9 Y ( . = r .d� pink �/olive leaf edges 1� � �� r �.�1 I�!'7' � �:�.�� � p g g � ` � \ �� ,,� �,, t, , j,, r� f�,,. Bank of America- Homestead Road .� t '� ,,,�,�,� . :p runin ❑s❑earin � �ell � ,� �. � 4� � ��, �,�a ,.� � f, EXISTING SOILS SHALL BE AMENDED PRIOR TO PLANTING PER RECOMMENDATIONS FROM SOIL �:,,h.�,�, E -- ` `�� M • Minimal to Moderate ❑ater � �t� .�„�,��;��; V e r y t o u g❑�t o l e r a n t o f p o o r c o n d i t i o n s , �� � . , � N U T R I T I O N R E P O R T. S O I L S A M P L E S F R O M P L A N T E R A R E A S T O B E S U B M I T T E D T O A S O I L S L A B �: ,,` `�� t,��, �� �: Regular ❑ater ' , � �;;'`,t���,.,� � FOR NUTRITIONAL ANALYSIS AND RECOMMENDATIONS. '''���' ' ` - t „�� Cotoneaster dammeri 'Lo-fasY ' � ," � : '° �;,�`� i`� Y 9 9- p ��:- _ -+ v�.� e;,, ,��t�< ��N �;, i� s� s. ;, - r Ver tou ❑, lon lived lant❑can survive ,�� ,�o��►�� � „%� �x � . � �?���°� i: '� '�` ;'.i', _it❑only occasional ❑ater Project Number Bronze-purple foliage year roundC�usc�a ; y � �� Bearber Cotoneaster Groundcover .,,LL ,� �tf � ' ������g, ,, . fF�. , r > w � rY � ) ',tj �� ;�, � ALL NEW LANDSCAPED AREAS TO BE TOP-DRESSED WITH A 3 LAYER OF RECYCLED BARK r,�s `��,1;, ,� ,�. � � �, .« i,,,,4�: _; �. �r , .t ,� , pink floCers in Spring, intermittently for rest � , ,> ; , ,�� ��- � :` � •�..,n , ��Z .� MULCH. NO PLASTIC SHEETING OR IMPERMEABLE SURFACING SHALL BE ALLOWED BENEATH y '�� Pale lavender flo-ers year-round, Ceaviest Protot y ���;'� _ , of t�e year ;` �' : � �j ; � , , ; ' 9 ' �" '�il�' _�� BARK MULCH. Ever reen Sa-ub �.� E��� � ��y `` "�`'� �j �' � �= in Spring and Summer. I ype�a out �.r > <; ; ,, �'�' �y ' � °� � z "" ��` � 1' �gC/ 10'❑spread ❑ maturity jd Y �� NEW LANDSCAPE PLANTING WILL BE IRRIGATED USING NETAFIM TECHLINE (DRIPLINE) ON AN ; ,� , � � ���A Nandina domestica 'Gulfstream' , ' F i � '#4� � `- ti. � ,; � �� _�_;;� �I��;.;� _ ;�� ;; ��� � �' ,�f: �}-� ` � �����,�a,. �;�'�� AUTOMATICALLY OPERATED IRRIGATION SYSTEM. NEW TREES WILL BE IRRIGATED USING LOW I Description � � , �� �; � �y.� HeavenlyBamboo ,:-� �,,��.,, �,��- ,�e,; �,�,;�; Minimal Cater ������ � ,�� �; �� � .,� Y�'� � �,;k� � �*�����.�','� `b� �; ����'�� � ��x �� ��; ,.� � Clytostoma callistegioides FLOW BUBBLERS SET IN VERTICAL PERFORATED TUBES TO ENCOURAGE DEEPER ROOT GROWTH. PRELIMINARY LANDSCAPE PLAN � ,. �_ � � �' � r � ;at'2aF �� `� ��: ��� ;��> �� •��� Violet Trumpet Vine � z ` f ^.�F_" nh � �,��" Evergreen S�-ub ;,. Y�y,i�"r �'{'�'S.w. ,$ �� � ; ,,�,��� ,; 4� r :_� �� s,�, f ,�,{ � :�' Extremely tougq Cardy groundcoverC � i��„ ,�,��, ��,,:� NEW IRRIGATION SYSTEM WILL INCORPORATE AN AUTOMATIC IRRIGATION CONTROLLER WITH r... �' ;^+ „u�.w �'$.;��, :s:.�. �,� �.�.'�'+: � � , < < ? ,r�t' S.� t,�, �t �•�e �' � '< r �,� ''��' N �. � ,,: tP���' non-invasive variety of Cotoneaster r, ,_ ' ''�' `��t �;,� �;Y`.ry�<a �w , , , ���`�y ;� w�r� �,-; ��,�z ;� �,, , Evergreen Vine WEATHER-SENSING CAPABILITY FOR OPTIMAL WATER SAVINGS. -� ��c�,..-�r-� ,-��, ° : 3-1/2' �g��/ 1-1/2' �ide maturity . �M, N Y �y+�� '�,f�r. ' ��f� "� � a �c,, 4�4 � ...-,a�7"' ; :� �. ..� ..,�4 N.�._,��c"r����y��'�jyw.:.�' Y��• ,' c � p ,s.4���.�.. � .h�d . a1' .� �,' � �, .-: { � .�;,b � ��t I Scale ,�, ,,:-,,� , �,.�E ,<--�k . �' f4��;.; ; ,�,;< Va,��F��9�'��;•Y Tiny ❑�te flo❑ers in Springa-ed berries in ����.F� , �,< ���xw��;���'� Stron ro❑in vine but easil ke t in c�eck ALL PLANT MATERIAL SELECTED FOR THIS SITE IS COMPATIBLE WITH NORMAL CLIMATIC f =,=.�;s "tij��� " � �S ' Minimal to Moderate Cater �°a,::�.���;�e?'��s,:; F�-•� ti�� ��zt g g g y p AS SHOWN ��� a�, a �c =�`�;;f �1 1 , - late Fall �r,,� �a��;,�,� $'a�� -it❑occasional pruning. Runners can gro❑ CONDITIONS FOR SANTA CLARA COUNTY. NONE OF THE SELECTED PLANTS ARE REPORTED TO ".��-r`r�'� �ha �P�. �'s "':"� ' �r - .�'� ��*.;�r��,�' �;�, �. � , .� � �������.� � ,1'�;;; 10' in a gro❑ing season. BE UNSUALLY SUSCEPTIBLE TO PEST INFESTATION, VIRUSES OR DISEASE. ��,��- � r ,: _ � �, ;., Small ��te flo❑ers in Spring, colored � ,� -s , G� �,- a�' ' � �� ,,f� ?� �t�;��; ��' _ foliage (red, yello❑, green)year round � � ���' �,` ,�y�+�, � - a�,�� �����'` x �.��, Regular ❑ater PLANT MATERIAL SELECTED FOR THIS PRO�CT GENERALLY HAVE A LOW TO MODERATE WATER i . �.�r'i+/ a,� ��-' �� �''� e t�� � r '°`K�"`�'�� Eas care, extremel tou ❑ p'��; �,�''.� �'���` USE RATE. NO LAWN TURF OR HIGH-WATER USAGE PLANTS ARE PROPOSED FOR THIS SITE. y y g � 1�������, ' �J ��,`' Violet and ite flo ers in Spring. �, '�" " a.'�`�+'��\_ ■ �' ',�� Y�Y�� ���,. 4� �,• ; . . . ���� � . _ . ��� B n k f Am ri �� .�� a o e ca � � Homestead Road - `�� �� � � .� , New Store . , ; � - - - - _ _ _ _ _ � - - - - - - - - - - - - - - - - - - � __ � � � , ,+ � � � �� , - �� � � ��� . - _ - � � 21020 Homestead Road 7 � '_ , 2 • ' ._ F � / _... � � : ' L" ����� _ � __ - -'- -- 12"WIDE CONCRETE BAND Cupertino, CA 95014 � ��� � - - - -- - - -- - - - ` ( RA , ROOMED FINIS ) \ - - --� G Y B H . . - � � � ;.�� � , �__ __,��- --- -- -- �_ � __ -�,_ . �. - _ _ ���„ � . , � � �, � � � �r ���,��, �> _ . . , �� � � . 1= =- �. ��:� -- � .� � , I SEATWALLPER = �'��' �� SERIAL NUMBER. CA - -, � I �- i i:'��,/T�i �L � � _- _ , , aRCHiTECTURa� � ���� � � � NRSP VERSION: 2.0 �- ' �� � � DETAILS _ �� '�"� _ --�, � � ,�� - -� _� `�� ;��� BULLETIN: 2017-2 v _ _ __ _ _� �� ��� ��� � � ,� ��� '�� � �� ,� � ' T���`,4 r��� ' ��'?��� ��� ' ���� '����� ��� �� / '\ - 2101 Webster Street I� � . ���� ��� �`� 'F %��, � Suite 2000 � � �/� �'� � � Oakland CA 94612 , � � �i � �` �� Tele hone 510.625.7400 T � �� Gensler p � CONRETE UNIT PAVERS: �� ������ � � �!� �r� � Facsimile 510.625.7499 � "CITY STONE COMBO" � �� i - BY PAVESTONE /T� Landscape Architecture: . � � % � �'� _ � / � �/�'-�h, � - a� _ ' � � - - - '�� ,���"� Pa vement Engineering lnc. - � � �� . "CITY STONE COMBO" BY PAVESTONE. Available in a variety of finishes, this paver combo brings scale and dimension to architectural settings. City StoneT"' can be used' I /'� ', YOU Cal7 /"lCJ�E Ol7 OUl"l"epUtat1017 I / - � or r t � alone or in combination modules of s mmetrical s uares and rectan ular sha es to create extraordinar atterns and endless desi ns. This avin attern combines the 6"x12" 10'TALL FREE-STANDING C po a e O ce.• y p g p y p g p g p � �/ � • 3485 Sacramento Drive, Suite A City Stone Rectangle, the 12"x12" City Stone Square, and the 6"x9" City Stone Rectangle. I TRELLIS: ECO-MESH PANELS p ^ A��` O� ^ n n C p I� n _ � BY McNICHOLS CORP. ��'11 V f\ �'11V1 C f< <'1 I San Luis Obispo, CA 93409-6095 805-78 9-2265 I I i I � � � i I SEATWALL PER I ARCHITECTURAL Pa�ment En�{neerin�Inc. DETAILS � Attn: �nathan Edholm,Pro�ect Manal �r � i � 3�0 CCpress ❑riC�, Suite 3 � COLORED CONCRETE (BUFF TAN, DAVIS � � � Petaluma,CA 94954 COLOR 375), BROOMED FINISH, W/TOOLED � T: 707-769-5330 THE WFORMATION CONTAINE�INTHIS�RAWING IS THESOLE PROPERTYOF 115.FOl1N�RY&MANl1FACTl1RING CORP.ANY REPRO�l1CTI0N IN PART ° � � E-llltlll: �Il�ltll�llle❑y1�LC�'111eI1YP.11�IlePiY117. ICOYlI ORASA WHOLE WITHOl1TTHE WRITTEN PERMISSION OF ll.S.FOl1N�RY&MANl1FACTl1RING CORP.IS PROHIBITE�.II.S.FOl1N�RY&MANl1FACTl1RING �INTS SPACED ❑ �2 O.C. �TYP.� Y CORP.RESERVES THE RIGHT TO MRKEMO�IFlCRTIONS TO�ESIGN WITHOl1T PRIOR NOTICE.�RAWMG IS 11NGbNTROLLE�WHEN PRIME�.WEIGH7S I , � AN��IMENSIONS ARE PROVI�E�FOR REFERENCE ONLY C92014 US FOUNDRY AN ERGLE MANUFRCTURING COMPANY � � Landscape Architect: Mike Wasden 4� STANDARD GRAY CONCRETE � License: CA I 4669 EI �. 10131�O1 I A i PANEL, BROOMED FINISH (TYP.) � I i 10' TALL FREE-STANDING � i r� /� � � �,� TRELLIS: ECO-MESH PANELS — ��'y� 12" WIDE STD. GRAY I �`�/�� � �\\����� I i BY McNICHOLS CORP. � � � 24 � — � BROOMED FINRSH � /� � � -� — I i �!�% � I '�/�!� � '�/ � � � i _ _..... ___.._ _ ___ .... I 0 0 � � � , I , � � A �p � 1 1 2 \ ��I�, \��I i,,- — � �� II �� I i i 12"WIDE STD. GRAY y y ���I��\\ y y ��'I`�\ � ��� I � �2� � I CONCRETE STRIP, � WL 4S ��8 I BROOMED FINISH i I ���� �I'1J� 1 1/2 I � i u u�� I aO 0 0 � I I � Issue Date&Issue Description By Check O D ' i! i 01 5/26/17 MPW MPW O D 24 � �� �� r� I� No � I � o � � � ��., "�_ _ _ _ _ _ _ _ _ _ _ _ _ _� _ _ _ _ _ _ _. _� � � � � � PARK�N� ' �, !���� Pre-Planning Submittal � � 0 � ' �� �� � ; - - 02 10/11/17 MPW MPW � � � � � i , � � � � � � � i Planning Submittal#2 � � � � � � � � � � � � � O US FOUNDRY TREE GRATE 0 � � � � � � � O� � 0 OOOOO i (MODEL 9501)-ADA COMPLIANT � � � C O N R E T E U N I T P A V E R S: � � I "CITY STONE COMBO" � � � � assi Nw 9srd srreer BY PAVESTONE I I �� Medley,FL,33166-2025 � I 48 � U S FO U N D R Y Phax 30�5-887-9429 ' ', ' 1/4 �� www.usfoundry com � I ,\ AN EAGLE MANl1FACTU0.ING COMPANY �O z014 All Rights Reserved I � � � TYP. i — , � �/2 23 5�8 USF 9501 TREE GRATE � I , �� TYP ADA Complaint LOAD CLASSIFICATION: L I h t D U t I � � � ° ° �n�Ria�: ASTM-A48 GRAY IRON CLASS 35B = - - - - - - scuF: � - ���_��� I 32 ree Grate No 8070272 I I I � o3—a�-11 I ' u�s , , I � � � REV: Q �ATE: REY BY: QUOTE� I I I / � � i I US FOUNDRY-ADA COMPLIANT TREE GRATE (MODEL 9501). Cast iron tree grate, 48" s�uare, ADA compliant for C ialking surfaces. I � I I _ _ I I � � � - - _—„�-- , �—, —,— —:: :—:: - � I � , � � ��� � _ , � _ _ _ � � I�\ � I� 3"x3" STEEL POST ❑ 4'-6" O.C. \�� � (TYP.) �I STEEL MESH PANEL: ECO-MESH I BY McNICHOLS CORP�}'WIDE x 8'TALL, DARK GREEN � � DECORATIVE SURFACE TREATMENTS ISeal/Signature , a0 1"❑10' NORTH ,�� CLOSE UP ��.,�,, ,..��,.�,a��o,«.F,, Project Name Bank of America- Homestead Road ECO-MESHO Screens are made with a heavy 0.12 woven wire mesh screen with a unique bridge wire for stabilization. This gauge is 2-1/2 times stronger than .080 wire found in competing products. Our special intercrimp ❑eave provides t❑e flexibility plant screens reCuire and eliminates broken �elds t�at can occur in ot❑er brands. IProject Number ECO-MESHO screens are framed on four sides by durable 16 gauge metal channel which is 25°/o heavier than 18 gauge frame commonly found in other products. IPrototype Layout IDescription DECORATIVE SURFACE TREAMENTS I Scale AS SHOWN 375 Buff Tan DAVIS Concrete color#375, Buff Tan ■ /� I;UK� '�� ■ ''SEE PG&E DRAWINGS i / o , „ RADIUS: 40.� Ba n k of Am e ri ca FOR CONTINUATION� S 8 9 4 7 0 0 E 1 2 9.6 3 A R C L E N G T F � \ I CHORD LENGTH: 56.�, — — � — — I — — — — — — — — — — — — — �;unRn R�oQinir,� cn� _ \ D1 COORDINATE REMOV�ALMWITH PG&EREMOVED. HO111�S 1.��� RO�� � — — — — — — — — — — — — � \ \ � I NEW UCD VAULT FOR UNDERGROUND UTILITY TRANSFORMER. + 1�- � � \ � � � � \ O WITH TRAFFIC-RATED COVER AND ASSEMBLY, VERIFY WITH PG&E DRAWINGS. N�W S l.Ol � \ \ / \ i \ � _ \ \ � , � ` � 21020 Homestead Road ' , � � � Cu ertino, CA 9 5 014 � 2 X2o � i p i ` , EMEN F ACIFIC B LL � \ I � � SERIAL NUMBER: CA � i - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - � � � 1 � i � � NRSP VERSION: 2.0 i i BULLETIN: 2017-2 I TOR. � � I � 4" CONDUIT � UCR 4 UCR 3 UCR 2 � � � PRIMARY FEEDERS I ME UCR 6 UCR 5 SBB HL FSA UCR 1 � � � � I _ � I � AISLE I 2101 Webster Street �� I � 0 SITE Suite 2000 ��—� WO N O REC CLIN Oakland,CA 94612 � - �- - - , ensler L I �I I I � Telephone: 510.625.7413 D � � 5 I � FEc WAITING Central Zone � Facsimile: 510.625.7499 � I I ° I I I � I 3 I 1 i BREAK RM. � � � �� I � + _ ' O O UCR 7 � I I I J.C. � � I PG&E CLEARANCE AROUND � � I UCD VAULT � I — � , � Nb 5" COND�UIT � i �� � � � I � I SECONDARY FEED�RS _ _ � _ J I � - - - - - -F� ER � I � � I- � � CALLING � NEW 400A, 208/120V, ° CUBES � 3PH, 4W SERVICE - - - - - - - - - - - ° ° � I A � � � I I I � I � � i I � Issue Date&Issue Description By Check � I woR RM. i � � ` 01 08/24/2017 � TELLER PLANNING COMMENTS I � � � . i � � G L o 0 0 ❑ ❑ ^ r PROPOSED BANK of AMERICA BRANCH BANK ' , r � � - - C ° G ❑ S° � i � 9 , � ► � WM (. FDC LEAN LEAN LEAN � � '' �""'' C C C � � I AIR AIR AIR VEHICLE VEHICLE VEHICLE ( I I � � � I � � � PROPOSED PARKING � - N � O W � M N Q� I O � I O I I � �� RECOLOGY TRASH BINS � ❑ I I SD 13 � , � - - � � � I I D1 I I L — — J �� � � �,,,,�,��,,,,�„�, .,,, .,,— + — — — — — — — — — � � I Seal/Signature � � \ \ �,,�'QRpFESS/p� � ACIES , N ��-- N682�, ��,'�`��``���'S° <FFF�c; SS„��� ENGINEERING ���, y; 3371 Olcott Street � W �; Santa Clara,CA 95054 �� No.E015418 � ; ; Exp. 06/30/19 �� ELECTRICAL SITE PLAN SHEET KEYED NOTES ph:(408)522-5255 ;� *,, fx:(408)522-5260 � J, c� � �` info@acies.net '=�qT�FCTR�GP���P�'� Copyright�c 2017 _FOF CA��F��'� "'�-�,......��� BUILDING COMMISSIONING 1. CONTRACTOR PROPOSING TO UNDERTAKE WORK UNDER THIS DIVISION SHALL VISIT THE SITE I Project Name OF THE WORK AND FULLY INFORM THEMSELVES OF ALL CONDITIONS THAT EFFECT THE WORK A. TESTING AND ADJUSTING - TESTING AND ADJUSTING OF SYSTEMS SHALL BE PERFORMED iN ACCORDANCE AND COST THEREOF, AND ExAMiNE THE DRAWiNGS AND SPECiFiCATiONS AS RELATED TO THE Bank of America - Homestead Road WITH INDUSTRY BEST PRACTICES AND APPLICABLE STANDARDS OF EACH SYSTEM AS DETERMINED BY THE SITE CONDITIONS. BUILDING OFFICIAL. PROVIDE A FINAL REPORT OF TESTING SIGNED BY THE INDIVIDUAL RESPONSIBLE FOR PERFORMING THESE SERVICES. 2. CONSIDERATION WILL NOT BE GRANTED FOR ANY ALLEGED MISUNDERSTANDINGS OF THE AMOUNT OF WORK TO BE PERFORMED. TENDER OF PROPOSAL SHALL CONVEY FULL I Prototype Layout B. OPERATION AND MAINTENANCE (0&M) MANUAL - PROVIDE THE BUILDING OWNER OR REPRESENTATIVE WITH AGREEMENT TO THE ITEMS AND CONDITIONS INDICATED ON THE DRAWINGS. SHOULD THE DETAILED OPERATING AND MAINTENANCE INSTRUCTIONS AND COPIES OF GUARANTIES/WARRANTIES FOR EACH CONTRACTOR FIND DISCREPANCIES OR OMISSIONS IN THE CONTRACT DOCUMENTS OR BE IN MEDIUM SYSTEM. 0&M INSTRUCTIONS SHALL BE CONSISTENT WITH OSHA REQUIREMENTS IN CCR, TITLE 8, SECTION DOUBT AS TO THE INTENT�THEREOF, HE SHALL IMMEDIATELY OBTAIN CLARIFICATION FROM THE I CAD File Name 5142, AND OTHER RELATED REGULATIONS. ENGINEER AND/OR OWNER S REPRESENTATIVE PRIOR TO SUBMITTING HIS PROPOSAL FOR WORK. C. INSPECTIONS AND REPORTS - INCLUDE A COPY OF ALL INSPECTIONS, VERIFICATIONS, AND REPORTS, REQUIRED 3. FIELD VERIFY EXACT NAMEPLATE DATA ON ALL EQUIPMENT FURNISHED UNDER OTHER I Description BY THE ENFORCING AGENCY, DIVISIONS AND/OR BY THE TENANT (I.E. HVAC EQUIPMENT, KITCHEN EQUIPMENT, COMPUTER SHEET INDEX & SITE PLAN EQUIPMENT, ETC...) PRIOR TO THE INSTALLATION OF ELECTRICAL WORK AND MAKE ANY ADJUSTMENTS TO OUTLETS, CONDUITS, WIRE AND/OR CIRCUIT BREAKER AS REQUESTED TO MATCH EQUIPMENT ACTUALLY FURNISHED. I Scale 4. REFER TO SPECIFICATIONS SECTION 16110 FOR UNDERGROUND CONDUIT REQUIREMENT. 5. ALL CONDUCTORS SHALL BE COPPER, CONDUCTORS FOR ABOVE GROUND SERVICE SHALL BE THHN – THWN. CONDUCTORS FOR BELOW GRADE SERVICE SHALL BE THW OR XHHW. O 2� 4' $� 16' CONDUCTOR #10 AND SMALLER SHALL BE SOLID, CONDUCTORS #8 AND LARGER SHALL BE STRANDED. E-0.0 SHEET INDEX & SITE PLAN EP-1.0 SITE PHOTOMETRIC E� EP-1.1 SITE PHOTOMETRIC CUTSHEETS � Ref, North CALGREEN BUILDING CODE REQUIREMENTS SHEET GENERAL NOTES SHEET INDEX a� � c o,y O p °' O DATE OF FIELD SURVEY �� N U DATUM STATEMENT BASIS OF BEARINGS � � � - � � � o APRIL 15, 2017 THE BASIS OF BEARINGS FOR THIS MAP IS THE MONUMENT LINE OF ��� N � COORDINATES SHOWN ARE BASED ON CALIFORNIA STATE PLANE NORTH AMERICAN DATUM (NAD83) ' ALL MEASURED DISTANCES SHOWN ARE US SURVEY FOOT GRID DISTANCES C H E R R Y S T R E E T, A N D T A K E N A S N O R T H 8 9 0 8 1 4 W E S T, F R O M F O U N D =_ �o � S U RV EYO R S STAT E M E NT ZONE III, (EPOCH 2O11.00). � MONUMENT POINT 106. "' � � c� � UNLESS OTHERWISE NOTED. TO OBTAIN GROUND DISTANCES DIVIDE GRID DISTANCES BY A COMBINATION o � , THIS MAP WAS PREPARED BY ME, OR UNDER MY DIRECTION, IN CONFORMANCE WITH THE FACTOR OF 1.000067014 J � � � PROFESSIONAL LAND SURVEYORS ACT. R E F R E N C E 1�T �, J o Q � 1�1 � �U � 20' io' o' 20' 40' 0 167 ROS 23 � U � � BOOK 167 MAP 23 � GRAPHIC SCALE: 1 INCH = 20 FT .� 0 O � � O p N c� � NU � J. MAY, PLS 8570 03/31/2019 SURVEY CONTROL HOMESTEAD ROAD (90' WIDE) POINT# DESCRIPTION ELEVATION NORTHING EASTING � - , _ + _ 100 CUT X 223.45 1949002.90 6113486.80 - - - - - - - _ _ 101 CUT X 220.25 1948631.90 6113585.18 - - - - - - - _ �os ST BM 102 X ON CURB 224.10 1948877.97 6113499.61 I103 N/S 224.82 1948905.68 6113388.97 V J I � J 104 N&S 224.57 1949017.31 6113392.50 � ELECTRIC CABINET ., DETECTOR Tc s Tc 105 CITY BM 16 223.26 1948987.20 6113502.82 � a N - - _ _ _ _ _ F� F�5S 2� 224.95' PG&E 224.69' BW S TC GB TC a �� , - - ,_ TC 224.42 223.82' , C Z 225.42 , , VAULT Tc Tc Tc 223.50 106 ST BM 222.53 1949062.34 6113548.77 z a 224.67 224,2g� TC S 224.26' 224.13� TC ESC DETECTOR 225g9 + 224.57' 223.so' I 1002 FND ST MON 227.10 1949069.73 6113057.90 m OWU BW E ,�j 2�O 225.s3' ' DRIVEWA , , „ 1003 FND ST MON 228.15 1949074.31 6112727.08 � > NZ Tc E �' BW E TC GB CROSS WALK BUTTON V � =WF" 2 2 4.9 9' FD PIN �►� .�- TC S + 24.67' T C 224. 223.42' � H�� BW S 224.22' + 225.� � , . N&s �29•1� 22 • + � 5019 FD RCE 10007 223.14 1948848.34 6113499.53 � v� 30 W � + 225.4' 24.70 224.87 224.7' 2 2 5.5 1 a + 2 2 5. ' TC� � + 22 73' L A W N + 224.8' B T� � � �_� � + 224.2' 22 .39 c`�i'� 225.2' + 2 2 4.9 2' 25 ' 24" DEqDUOUS 225.5' + 2 2 5.9' 222.9TC O �QU + 225.9 ��� I » DL 15' � BW + 224.7' 2 2.86' � N J �2 D E q D U W 24" DEqDUWS �u 223•6$' p .�' TC GB LEGEND ABBREVIATION o p 0 PACBELL EASE F` � DL 15' �°9��O 223•2�� I W DOC N0. 13789176 � 7c +�2 4.97' ��,0. .o ZN 225.38 + 224.8 '225.42' 7c 2 ��o�- 22�0o T� ELECTROLIER WITH ARM AC ASPHALT AT&T UNDERGROUND � CABLE BOX W/CONC. 224 95.57 �-�p3 BW cuT x C23'2� DI 122 PLATFORM 224.7s' . 223.22' GRATE EL. = 223.22 ❑"" WATER METER TC TOP OF CURB Q 223.39 + 224.1' 122 INV. EL. = 219.42 INV. 12" RCP IN (SW) = 219.62 Tc Y BUILDING OVERHAN BW „ TREE 24M PALM � a 2 43' I INV. 24 RCP OUT (NE) = 218.92 ' DL 5' '-� � o FL FLOW LINE N BUILDING B ESC � 7c ssc 225 2� + 224.6 ' + 224.51' Z FF=225.69 2 .43' ¢ 223•2�� � FIRE DEPARTMENT CONNECTION �B +224'2� � + 224. ' o � GB GRADE BREAK N + 225.4' __ � Tc T Y P. I T} 2 2 4.4 3� 2 . P A R C E L B LAWN"'y � °°P' P O S T I N D I C A T O R V A L V E CONC. CONCRETE L � 225.23 � TC 225.58' o O � 225.24� 16 7 R 0 S 2 3 + 2 � �' ELECTROLIER Z 24� PALM I SSC START SMOOTH CURVE Y � o DL 5 TC Q p U O � � 225•2�� 223.89' GAS SERVICE + 2 .9' ESC END SMOOTH CURVE /� M o } `�' CATCH BASIN ^ N; _ � o + 2 4 22a.00' BUILDING OVERHANG Bw � o ^ W 223.50 T � � � � � J , o o TCE W � NWY 8 C H A I N L I NK FENCE � 225.5�' � �`� GAS METER � o AC PAVEMENT 7c E Z 5.6 � o o Y 4" D E C I D U O U S I (/� S START �� W a � DI 275 + � 2 2 5.5 3' 2 2 5. � OL 10' � � � _ rc' +• 5 �22 . rc �I E END � } GRATE EL. = 223.49 . , O SANITARY SEWER CLEANOUT 225.15 ��12' 2 . + 224.20' 4. ' OOR 223.43� � INV. EL. = 220.69 so TC � CONC. W Y g INV. 6" RCP OUT (E) = 221.64 225,�2 ��� 224 00'4 TC ESC �Z 225 �"' � g23 5�, � Z � ■� M Tc TRAFFIC SIGNAL LIGHT � TC TC SS 25.01' �n � TC BG WALK a � 225.17' TC 225.4 ' 10 225.56 � a225.28' � � 225.12� N/ 225.49 y T� TC S W 4.00' \ PARKING LOT 224.01' Q TC S223•��� � �w � � WATER VALVE + 225.8' TC SSC � + 224•92 S0 + 224.67' + 224.54' + 224.45' + 224.3 w 223'S9 O Tc 225.13� + 224.17' AC��IENT � I I � 225.29� + 224.23' � 24• pq� 224.51' \ � � + � UNKNOWN VAULT � TC ESC E T TC DL 5� 224.5 ' 4.10� TC S � 102 �� p N 225.16� + 224.39' + 224.84' + 224.73' + 224.33' 223.72 � DUMPSTER AREA \ 224.00' FL S X ON CURB N � � z CINDER BRI K WA L + 22� , 223.ss� � SIGN � a w 24' DEqDUOUS TC T� 4pp TC S � � II � � V DL 20' 225. ' 22 11� T w�8 223.78' � O � X _r, TC E c 224$ �� Tc E � O TOWILL CONTROL ELECTRIC CABINET 225.01' 225•4� 224.95' 225'� Tc p� � 224.13' � TC 224.59' 2 4.87' 224 5' F L E � 2 Tc 223'68� � �+ FIRE HYDRANT � ' r' 2 2 4.8 7 �6" 1REE 224. 4� I VICINITY MAP " $9�4'o E , 2 2 .4 1' TC 1 3 4.1 8 2 2 5.0 6' 8" 1REE � � + 224.5' 2 2 3 6 5' J W �•�,:�.,�-r , t . ; }�' �:� � ,---r-T , �,-.---�� � � � 10' TREE . 15 1REE I ��``?'��;. , �t � "` l� s!`�i� �� "'`":.�"' '�• `- �� �' + 225.8' 225.43 DL 1' DL 1 � ' „ , 5019 Q � � Q ����' `��' °'`'�"` '�' ' 36" DEqDUOUS + 22s.2' + 225.8' ?8g3, DL 1 FD RCE 10007 T R A F F I C S I G N A L N ¢o N � o � �� �.a' `� � �;��' _ 1� ..�'� �' `s�. �. ��1� ELECTROLIE �'-�'`' `i '�����"F . � - � ��� ��y' � �� �{� � - �'�"!� DL 20' 8' C ON ' R 225.7' + .2' �: �' ��'� ��'�'�-�s---.� `�� ��,� „� j �: � � ' " � �'��'�rr� . �������;, HAINLINK FENCE 24 CONC. � � TELEPHONE VAULT � � �������`�-:�'�'`� . r =�i�;�r� i� _'��-�r��r��, �-;y j. L �� BASE + �..:* �4+� ` 1�; PROJECT � -'��`��,. = �` � a '�.r� '� '. ' y ~��'-'lti'�,�l�f � SITE � �i �� ;...,���J'�fa6� jE x' a. � �, � TC. $ 0 �'r` * r+ 'r�=1 r �..i�� � � � 1� rF�'1 :`.il� n�, 1..� 223.67�' I I4� .. �1� k*�s.:fl� �_� � :������ r �,... �'�6y�!}:�4"�4 y}�r.� �� pI '• '� a �r�..�. .- ���� . �+� ' ��,��a i ❑ ,�.. � , GAS METER m °� `' » ��-� ���-��� '� 1�, `�``����',ti ����, �,= .�F����� DI 1058 �4,sm,,,'"�:� e;•�"'' �" �� � 4� ����11f- +'- = 3�s��!� - - . � I �J.aw � ;I F���,_,..j -r� '�� F�-::. ; ,.� � t� � , i ^ .� ��. �� �= w GRATE EL. - 223.71 r,l; : •"i-.`'� , • r ''� '' ' ! r_ ��.,� , -. . �ri Y_� � .�: . P A R C E L A �N�. E�. = 220.�, � GAS VALVE �`�'������,-� ,�-'; ' E��, � .�� ��'-:;-- �.�- CUPERTINO �� _ I I � - ..`�. � A :�`„ ` 'r�,�; °#,��=�' i t'�',�-;`� ,�,,;,r..�„ INV. 6 RCP IN (W) - 220.74 I - �1�";"�: ��. �. �;j�-� w �-:- � -, � � INV. 6" RCP OUT (N) - 220.69 ��-.��, .. �- , _� ,F� .,,-� ; �,? � �� 167 R0S 23 , -�?��', 11 ±� ����� '�i-,' ����kl���,� ��� �!� �' � ,:�, - o° CURB RAMP . .-�, • . ,� :'i. .r� _ �.. li I �� '-��,..�. `. _:`���iF'�'i�`albnr�i+a_Ti_tA1'3N5�:`��s��,i�"��=� ----- - . � ��. - --- - . �� .� =2r.-7f�'.�� . _ � .-. � . _. . ..- - � � /� � . .. . . _ - W/P M - �, �, :;� �;�, "�r�� r � ������ -� UNDERGROUND WATER PAINT MARK Z ��p,�lt,�'A� � '��, � ` ��� � =, '��V+r�t. _��:,ili�,'y��,-In�d�'Ai!"te►t�'l��,��_�a,i- °i 6 ���'�.i� � N I I G/PM UNDERGROUND GAS PAINT MARK W � I �� ^ ��- FENCE � � I I w So So UNDERGROUND STORM DRAIN PAINT MARK Q � m � N � w � z � � I � N � O �A O � � SHEET � OF 1 . ��� B nk f m i �� a o A er ca I Homestead Road New Store 21020 Homestead Road Cupertino, CA 95014 SERIAL NUMBER: CA NRSP VERSION: 2.0 BULLETIN: 2017-2 24'-0"MIN. r MATCH MATCH � � EXISTING CITY STREET � I ��224.9osw 224.12FL 224.00F[ LIGHT, TO REMAIN � z RELOCATE 1 B TRAFFIC 2101 Webster Street � � rn Suite 2000 _ m SIGNAL POLE � � - - -- - -_ - - - - - - - - - - - - - - - - - - - - - - - - i Oakland, CA 94612 � � 0 � '� �s� - - - - - - - - - - � i Telephone 510.625.7400 \I . . � _ o , „ � Ts ����I�� Facsimile 510.625.7499 > � - - - -- - - S 8 9 4 7 0 0 E 1 2 9.6 3 � � - � - - - - - - - - o - - - - - - - -- - - -- - - -- - - - - - -- - - -- - - -- - - -- - - --� � � I - - - - - - -�- - - - � -�- - - - -- - \ � Civ11: � MATCH � i � - -- -- -- -- -� _� _ � 225.30EG \ / � � � �� � � � TYPE A CURB RAMP � ��_� � \ � ; , ' '� �' � ROUND�EXIST�N� c�Y������ � \ -- Pavement Engineering /nc. _- - , � ;:� � X � I sTREET �i�HT \ \ \ 222.84SW F� You can ride on our reputation ' ` \ 219.341NV IN \ I i � I � \ � Corpo�ate Office.� � ----- ,, 222.85SW/FL 223.51 TG I � \ � � � � 213.51/NV OU7 • 3485 Sacramento Drive, Suite A � � / \ � \ � soa;�H San Luis Obispo, CA 93401-6015 � �v h�� LLLI�I I'.� \ � \ 805-789-2265 � ,��EMENT FOR �` I � 225.77TC ' ' ��� ` \ I 225.27EP NEW \ � \ �IFIC BELL _ _�� 224.98TP �EW MONUMENT � - - - -- � =WER SIGN � \ Pavement Engineering Inc. 225.70TC JLRVICE 223.31SW CONNECT TO CITY Attn: Jonathan Edholm Pro ect Mana er . � 225.92TC � 225.28EP � � �. � -_ � � � J g � � ^ 225.57TC � �-------------------------------------------------------- ----- � STORM DRAIN 3820 Cypress Drive, Suite 3 � 225.50EP � � � � � 5 � MANHOLE Petaluma,CA 94954 � � ��� PROTECT IN PLACE ' � � � EX. TRANSFORMER PAD � \ T: 707-769-5330 I � � E-mail:jonathane@pavementengineering.com � 5� � � T � • • � Engineer of Record: Joseph L.Ririe,P.E. ' �O� • � • EXISTING TRAFFIC License: CA 52735 Exp. 12/31/2018 I • - • � � SIGNAL, TO REMAIN • • � i i • � ` • • • 1 • • � � 224.°45W � �� •�, C.3 AREA CALCULATIONS � � , � . � JUNCTION BOX � � TOTAL PROPOSED IMPERVIOUS SURFACE AREA : 14,595 SF I • I PROPOSED PERMEABLE PAVERS AREA: 1135 SF � • � i i ��18 PERCENTAGE OF CATCHMENT AREA : 7.8% . i i � � i I • I I I - � �Nb' � 224.50SW • � � NEW 225.69FF • � � � I _�cCTRICAL_ ___ _ . . �P � I LEGEND � � S E RVI C E 224.50SW 224.50SW I � O� 225.69FF � i i AREA OF BIORETENTION BASIN I � i NEW 224.81SW � I • • • • • • ACCESSIBLE PATH OF TRAVEL I � Issue Date&Issue Description By Check TEL/DATf, 224.31EP __Y_____ � I � 01 5/25/2017 JRE MPW � --------- I i SERVICE . � I � � I EG EXISTING GRADE Planning Review 225.30SW EP ' OVERFLOW DRAIN W/STORMTEK I EP EDGE OF PAVEMENT i � ST3G INSERT (FULL CAPTURE DEVISE) & BIKE � I � � "NO DUMPING - FLOWS TO CREEK" PARKING (4) � � �I I ' FL FLOW LINE � TREE WELL W/ADA METAL MEDALLION CURB RAMP � JUNCTION BOX I� i CURB RAMP � � FG FINISH GRADE � � COMPLIANT GRATE 224.5osW _" I � ' (/ (TYP.) 225.69FF � °I I '! � I � • r�-�� I R SW SIDEWALK SURFACE • • • � • � f--- -----_ -� � � • • • • • � � � � � TC TOP OF CURB '� 24"x 3" RECTANGULAR •• • • • • • • • • • • • 224.03SW 224.03SW � �P � � � I DRAIN UNDER SIDEWALK • 223.53PCC 223.53PCC • ' ' I � � � � • I C XXX.XX DESIGN ELEVATION i FLOW � • I i G XXX.XX EXIST. ELEVATION I 225J9TC � 224.32SW 224.19SW • 224.46PCC � 225.29EP 223.82FL • 223.69PCC / 223.80PCC 223.91SW PCC � 224.04PCC � � I ' - BOLLARD I I C � • � � � j (] 223.37TP (TYP.) ° • N � � M �i � � � ..! � � 12'-0�� • g�_��� M � � � � � /� � 9�-O�� i • - / FDC �� - - � � � H So P� �� � - -- _ ����-��� • D4 �i o `I • �/ TYP. � � . T M � . ,�AN, � �i � � � 223.99SW EP FL � � � I � � �� ��� CLEAN , CLEAN � � 0 I �� No � I � � MATCH � � AIR AIR � � � ic �EHic�E / � P�RK�N� � i 223.12FL I - - � 0 • f � F�' � • 224.05PCC EP 224.22PCC EP 223.67SW EP i � 223.60SW � I � • CONCRETE PAD 223.59SW i • PERMEABLE PAVERS I I � • � W/UNDERLYING PERFORATED i � FLUSH SIDEWALK • � PIPE CATCHMENT SYSTEM ,� � � I ,I BOLLARD • � JUNCTION BOX ► � I z (TYP.) � � � I`� I � � 225J3TC � � � � � I �w � � 225.23EP • � � I o N I � � • CONCRETE CROSS WALK � o II • NEW TRASH ENCLOSURE SPEED BUMP � I� i • � & CONCRETE PAD I I �• • • • • • • • (TYP.) � 224.04SW I ' I • �O 223.59SW EP I 223.70SW IRECOLOGY TRASH � � � � ' OS� � � MATCH I ��. � ' 223.56FL I i I I �-_', � � REMOVE & REPLACE � �� � � � � , � � ' DUMPSTER PAD Seal/Signature / 225.53TC 225.55TC I ' � � 225.03EP 225.05EP i � � ��' �- - - , � � / � � �' I � ,�, � MATCH MATCH � �� � �226.14EG - - 225.51 TC � II � � 225.O1EP � � - - - - - -- - -„ -- - - -- - - -- - - -- - - -- - - -- - - -- - - -- - - � �� �� � � EXISTING TRANSFORMER TO BE REPLACED WITH UNDERGROUND UNIT `��� 224.32SW I � � �\24.32EG i � N68° \� I Project Name 2�SS�2693- Bank of America- Homestead Road ��I � I Project Number � Prototype Layout �'-0 I Description y � '. EXTERIOR SITE IMPROVEMENTS FULL SITE PLAN IScale 1"=10' AS SHOWN ■ OO 2015 Gensler Attachment 4 Ellen Yau (page i of 3) From: Celia Watson <celia.watson@mac.com> Sent: Wednesday, October 18, 2017 7:49 PM To: City of Cupertino Planning Dept. Subject: Development Proposal at 21020 Homestead Rd, Cupertino 95014 Hello, I have recently seen this notice of proposed development and have to ask WHY? WHY, WHY, WHY? Why is another Bank of America branch necessary? With the trend to online banking and mobile payments surely another bank branch will be obsolete in just a few years. And then the question will be what do we do with this empty bank building? As the notice states it is to replace an existing multi-tenant commercial building. It is not an empty building. It is occupied by businesses, some who have been there many years, serving the community in a myriad of ways; a community trending to banking online! The area is busy with traffic. If street or parking lot improvements are necessary, improve it, but not to the detriment of current businesses. Does landscaping include the addition of shrubs or trees? Why remove 14? Does Cupertino really need another plaza? If another bank branch is a necessity would it not be better placed, and served in a location that can easily be approached on foot such as a shopping mall. Thank you for considering these comments. Kind Regards, Celia Watson Total Control Panel Lo�in To:planning�a cupertino.org Message Score: l High(60): From:celia.watson@maacom My Spam Blocldng Level:High Medium(75): Low(90): Block this sender Block mac.com This message was delivered because the content filter score did not exceed your filter level. 1 Attachment 4 Ellen Yau (page 2 of 3) From: Joyce Clark <joyceclark27@yahoo.com> Sent: Wednesday, October 18, 2017 8:55 PM To: City of Cupertino Planning Dept. Subject: Application No. ASA-2017-05; TR-2017-3g Regarding the property at 21020 Homestead Rd. where the hair salon, Happy Cuts, is located at Suite C, in Cupertino, Ca. 95014, I wish to request and vote that they be allowed to stay at this location. Since there is no longer a shopping center that is easy to access in either Cupertino or Sunnyvale, it would be much better and easier for clients to keep Happy Cuts at this location as there are a lot of customers that use this location. Thank you for your consideration. Total Control Panel Lo�in To:planning�a cupertino.org Message Score: l0 High(60): From:joyceclark27@yahoo.com My Spam Blocldng Level:High Medium(75): Low(90): Block this sender Block yahoo.com This message was delivered because the content filter score did not exceed your filter level. 1 Attachment 4 (page 3 of 3) From: Ilka Atanassova [mailto:ilka68@�mail.com] Sent: Monday, October 16, 2017 1:58 PM To: City of Cupertino Planning Dept. <plannin�@cupertino.or�> Subject: 21020 Homestead Blvd Hello, Me and my family want to vote against new Bank of America development. We've been clients to the excellent Happy Cuts for more than 5 years now and we want them to stay and serve our community. Best regards, Ilka Atanassov