B-2017-1777 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: CONTRACTOR: PERMIT NO:B-2017-1777
21074 MARCY CT CUPERTINO,CA 95014-1658(326 54 029) CLEAN SOLAR INC
SAN JOSE,CA 95112
OWNER'S NAME: HSU DARREN S AND SANDY S TRUSTEE DATE ISSUED: 10/16/2017
OWNER'S PHONE:408-368-8552 PHONE NO:(408)217-8876
LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO:
License Class SOLAR Lic.#910849
Contractor CLEAN SOLAR INC Date 02/28/2018 X BLDG _ELECT _PLUMB
MECH X RESIDENTIAL_COMMERCIAL
I hereby affirm that I am licensed under the provisions of Chapter 9(commencing
with Section 7000)of Division 3 of the Business&Professions Code and that my
license is in full force and effect. JOB DESCRIPTION:
(N).14 PANEL ROOF MOUNTED PV SYSTEM(4.48 KW)
I hereby affirm under penalty of perjury one of the following two declarations:
1. I have and will maintain a certificate of consent to self-insure for Worker's •
/ p1 Compensation,as provided for by Section 3700 of the Labor Code,for the
/ ,;erformance of the work for which this permit is issued. •
Ip. have and will maintain Worker's Compensation Insurance,as provided for by
$,Y.1Section 3700 of the Labor Code,for the performance of the work for which this
permit is issued. Sq.Ft Floor Area: Valuation:$13852.00
APPLICANT CERTIFICATION •
I certify that I have read this application and state that the above
information is correct.I agree to comply with all city and county ordinances APN Number: Occupancy Type:
and state laws relating to building construction,and hereby authorize 326 54 029
representatives of this city to enter upon the above mentioned property for
inspection purposes. (We)agree to save indemnify and keep harmless the
City of Cupertino against liabilities,judgments,costs,an expenses which PERMIT EXPIRES IF WORK IS NOT STARTED
may accrue against said City in consequence of the grant g of this permit. WITHIN 180 DAYS OF PERMIT ISSUANCE OR
Additionally,the apply n understands and wi -.mply w' all non-point
source regulations.ert4 Cupertino Munic'.al ode action 9.18. 180 DAYS FROM LAST CALLED INSPECTION.
gnatur� Date 10/16/2017 Issued by:Abby Ayende
Date: 10/16/2017
I hereby affirm that I am exempt from the Contractor's License Law for one of the RE-ROOFS:
following two reasons: All roofs shall be inspected prior to any roofmg material being installed.If a roof is
1. I,as owner of the property,or my employees with wages as their sole installed without first obtaining an inspection,I agree to remove all new materials for
compensation,will do the work,and the structure is not intended or offered for inspection.
sale(Sec.7044,Business&Professions Code)
2. I,as owner of the property,am exclusively contracting with licensed Signature of Applicant:
contractors to construct the project(Sec.7044,Business&Professions Code). Date:10/16/2017
I hereby affirm under penalty of perjury one of the following three declarations: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
1. I have and will maintain a Certificate of Consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
performance of the work for which this permit is issued. HAZARDOUS MATERIALS DISCLOSURE
2. I have and will maintain Worker's Compensation Insurance,as provided for by I have read the hazardous materials requirements under Chapter 6.95 of the
Section 3700 of the Labor Code,for the performance of the work for which this California Health&Safety Code,Sections 25505,25533,and 25534. I will
• permit is issued. maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
3. I certify that in the performance of the work for which this permit is issued,I Health&Safety Code,Section 25532(a)should I store or handle hazardous
shall not employ any person in any manner so as to become subject to the material. Additionally,should I use equipmen ' devices which emit hazardous
air contaminants as defined by the Bay Az...Air uality Management District I
Worker's Compensation laws of California. If,after making this certificate of will maintain compliance with the Cupe r o .nicipal Code, hapter 9.12 and
exemption,I become subject to the Worker's Compensation provisions of the the Health&Safety •� 5505,25533,a:25534.
Labor Code,I must forthwith comply with such provisions or this permit shall
be deemed revoked. faauriner or authorized agent —
APPLICANT CERTIFICATION Date: 10/16/2017
I certify that I have read this application and state that the above information is I`:JI I► a►n l` •
correct.I agree to comply with all city and county ordinances and state laws I hereby affirm that there i'IMnstruction lending Mir y for the performance
relating to building,construction,and hereby authorize representatives of this city of work's for which this permit is issued(Sec.3097, C.)
to enter upon the above mentioned property for inspection purposes. (We)agree Lender's Name
to save indemnify and keep harmless the City of Cupertino against liabilities,
judgments,costs,and expenses which may accrue against said City in Lender's Address
consequence of the granting of this permit. Additionally,the applicant understands
and will comply with all non-point source regulations per the Cupertino Municipal ARCHITECT'S DECLARATION
Code,Section 9.18. I understand my plans shall be used as public records.
Signature Date 10/16/2017 Licensed
Professional
`-- Z 1--- A-1-+
•\ I // ALTERNATIVE ENERGY PERMIT APPLICATION AE
' COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION
,St.,nss 10300 TORRE AVENUE•CUPERTINO,CA 95014-3255
CUPERTINO (408)777-3228•FAX(408)777-3333•buildinq(a cupertino.orq
PROJECT ADDRESS /07.9f mare. (7 . APN# 32,6...... 5y 6 2„?
OWNER ,, -0......,v'!ty ltx, P43k 36C6 5-5 7)-2- B-
diHsi)e,cd/ aL�1r/).0„
STREET ADDRESS-1� � 7� �,^ � C SPP§ yS�y9F1 Z,I�P��//f� 7L/1 s•(L FAX
CONTACT NAME mar.
/ O//' �r 7,....7CJd T
tot S/// /a? ' TTT JZ7,-fnd�p q LinPri' 'GI�a��so%� c�✓1�
STREET AD S ) q £ e,/ [a CITY, Z(�Ls 'IP Y ' 3 •
❑OWNER 0 OWNER-BUILDER 0 OWNER AGENT ONTRACTOR 0 CONTRACTOR AGENT 0 ARCHITECT 0 ENGINEER 0. DEVELOPER '❑TENANT
CONTRACTOE�'e 0-7,
/ /t', LICty�Sy$ C�� LICE /3 BUS.LIC#
COMPANY NAM ((�/.ic��-� CC.9e2
•E-MAIL CJ..J���C ,f--e c//.K/ C,]er/G/ .t Gl y 4
/ CITY,STATE,Z P -PHO ,J 7
STREET ADDRESS
lv(4 j:240 iI Cfe �� eya/) �z ?'s cam,
ARCHITECT/ENGINEER NAME LICENSE NUMBER BUS.LIC#
COMPANY N E� E-MAIL FAX
S ET ADDRESS CITY,STATE,ZIP • PHONE
USE OF [ D or Duplex ❑ Multi-Family PROJECT IN WILDLAND PROJECT IN
STRUCTURE: ❑ Commercial URBAN INTERFACE AREA ❑ Yes fFiq'0 FLOOD ZONE :❑ Yes•...elfO
OLAR PANELS ❑ ELECTRIC VEHICLE CHARGING STATION ❑ SOLAR WATER HEATING ❑ OTHER:
FOR SOLAR PANELS: NUMBER OF PANELS/UNITS: J/// KILOWATTS(COMMERCIAL ONLY): // p TOTAL VALUATION/S
DESCRIPTION OF WORK /i / o/ ys,,,,Ler7L.
7/..-s ) VED B '.Y yi }
,. "` CttliiREY tV . >,
is
By my signature below,I certify toe , be s lowing: I. Ttlie p o•,=' owner• authorized agent to act on the propertyrty'o half. I have read this '
application and the informatio ab ve pro '+ i is corr'ct. I h - •the Desc': on of Work and verify it is accurate. I agree to.comply with"all•applicable local'
ordinances and state laws rel ting to •I n_• ••nst7u auth!.•,. - •.h tatives of Cupertino to enter the above-identified property for inspection,purposes.
Signature of Applicant/Agent: f� ® Date:
QUIRED , ri it E
EMENTAL INFO' T N ' ; OFFICE USE ONLY ,,
P 't ❑ OVER-THE-COUNTER+! i
W: y Npla_a II k y
EXPRESS + i
y.
4.41'.'-;: 0 STAN�DARDn- �}. ,j 1
NzV > I -3 'rte
t-Il{a x a,O LARGE v u `i i,2 '#�i..
... ...� D MAJOR €! Ca .r:tl =...1
PVApp 2011.doc revised 03/16/11
C71
CUPERTINO
PURPOSE
SMOKE i CARBON MONOXIDE ALARMS
OWNER CERTIFICATE OF COMPLIANCE
COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3228 • FAX (408) 777-3333 • buildino(ftupertino.orp
PERMIT GAl 1V iT.B TAL UNTIE .THIS CERTIFICATE HAS: BEEN:
COMPLETED; SI +GI Ell AND RETURNED TO THE BUILDING DI STON:
This affidavit is a self -certification for the installation of all required Smoke and Carbon Monoxide Alarms for
compliance with 2016 CRC Section R314, R315,2016 CBC Sections 420 6 and 907.2.11.2 where no mterior access
for inspections are required.
GENERAL INFORMATION
Existing single-family and multi -family dwellings shall be provided with Smoke Alarms and Carbon
Monoxide alarms. When the valuation of additions, alterations, or repairs to existing dwelling units exceeds
$1000 00, CRC Section R314, R315, and CBC Sections 907.2.11.5 and 420.6 require that Smoke Alarms and/or
Carbon Monoxide Alarms be installed in the following locations:
AREA
SMOKE ALARM
CO ALARM
Outside of each separate sleeping area in the immediate vicinity of the
bedroom(s) — (Smoke alarms shall not be located within 3 feet of bathroom door)
X
X
On every level of a dwelling unit including basements and habitable attics
X
X
Within each sleeping room
L X
Signature . .. ......... ... . .. . ... ... Lic.# Date:
Carbon Monoxide alarms are not required in dwellings which do not contain fuel -burning appliances and that
do not have an attached garage. Carbon monoxide alarms combined with smoke alarms shall comply with
CBC Section 420 6 and shall be approved by the Office of the State Fire Marshal.
Power Supply In dwelling units with no commercial power supply, alarms) may be solely battery operated.
In existing dwelling units, alarms are permitted to be solely battery operated where repairs or alterations do
not result in the removal of wall and ceiling finishes or there is no access by means of attic, basement or crawl
space. Refer to CRC Section R314 and CBC Sections 907.2.114 and 420.6.2. An electrical permit is required for
alarms which must be connected to the building wiring
As owner of the above -referenced property, I hereby certify that the alarm(s) referenced above has/have been
installed m accordance with the manufacturer's instructions and in compliance with the California Building
and California Residential Codes. The alarms specified below have been tested and are operational, as of the
date signed below
Address: 7 � C2�� 1�
Permit No. �3,'� 11'/'7 7-7
Specify Number of Alarms # Smoke Alanns F77 # Carbon Monoxide Detectors 1 T7
/ have read and agree to comply with the terms and conditions of this statement
Owner (or Owner Agent's) Name:
Signature Date:
Contractor Name:
Signature . .. ......... ... . .. . ... ... Lic.# Date:
Smoke aTrd COfonn.doc remised 0111012017
JPH
G-1
SHEET NUMBER:
DRAWN BY:
DATE:
REV:
10/11/17
10/16/17PROJECT:CS PROJECT ID: 3019-SJHSU, DARREN & SANDY21074 MARCY CT.,CUPERTINO, CA 95014(408) 368-8552LICENSE HOLDER'S
SIGNATURE
CLEAN
SOLAR INC.
1445 KOLL CIRCLE.,
SUITE 109
San Jose, CA. 95112
Cont. Lic # 910849
www. cleansolar.com
AERIAL MAP
PARCEL MAP
VICINITY MAP
NTS
NTS
NTS
INSTALLATION OF
(14) LG ELECTRONICS LG320N1K-G4 MODULES &
(14) ENPHASE IQ6PLUS-72-2-US (240V) INVERTER(S)
STC RATING: 4.48 KW DC
CEC RATING: 4.0 KW AC
OCCUPANCY TYPE: R-3
CONSTRUCTION TYPE: V-B
AHJ: CITY OF CUPERTINO
APN: 326-54-029
PROJECT VALUATION: $13,852.00
G-1 SCOPE OF WORK; SHEET INDEX; VICINITY MAP
G-2 NOTES; PROPERTY PLAN
G-3 ROOF PLAN; EQUIPMENT LOCATIONS
S-1 ROOF FRAMING PLAN; ELEVATIONS; ATTACHMENT DETAILS
E-1 ELECTRICAL LINE DIAGRAM
E-2 ELECTRICAL CALCULATIONS
F-1 SIGNAGE
Z-1+ SPECIFICATIONS
SCOPE OF WORK SHEET INDEX
HSU, DARREN & SANDY
4.48 kW DC SOLAR PHOTOVOLTAIC SYSTEM
21074 MARCY CT., CUPERTINO, CA 95014
Abby Ayende
10/16/17
10/16/17
B-2017-1777
Abby Ayende
JPH
G-2
SHEET NUMBER:
DRAWN BY:
DATE:
REV:
10/11/17
10/16/17PROJECT:CS PROJECT ID: 3019-SJHSU, DARREN & SANDY21074 MARCY CT.,CUPERTINO, CA 95014(408) 368-8552SCALE: 1/16" = 1'-0"
LICENSE HOLDER'S
SIGNATURE
CLEAN
SOLAR INC.
1445 KOLL CIRCLE.,
SUITE 109
San Jose, CA. 95112
Cont. Lic # 910849
www. cleansolar.com
BACK OF
RESIDENCE
FRONT OF
RESIDENCE
PROPERTY PLAN
PROPERTY
LINE
EXISTING
RESIDENCE
NOTES
ALL MATERIALS, EQUIPMENT, INSTALLATION AND WORK SHALL COMPLY
WITH THE FOLLOWING APPLICABLE CODES:
· 2016 CBC / 2015 IBC
· 2016 CRC / 2015 IRC
· 2016 CEC / 2014 NEC
· 2016 CMC / 2015 UMC
· 2016 CPC / 2015 UPC
· 2016 CFC / 2015 IFC
· 2016 BUILDING ENERGY EFFICIENCY STANDARDS
· 2016 CALIFORNIA ENERGY CODE TITLE 24
· 2016 CALIFORNIA HEALTH AND SAFETY CODE
· WHERE APPLICABLE, RULES OF THE PUBLIC UTILITIES COMMISSION
REGARDING SAFETY AND RELIABILITY
· THE AUTHORITY HAVING JURISDICTION
· MANUFACTURERS' LISTINGS AND INSTALLATION INSTRUCTIONS
· CEC ARTICLE 690
· CFC ARTICLE 605.11
· IEEE STANDARD 929
· UL STANDARD 1741
· OSHA 29 CFR 1910.269
· THE AUTHORITY HAVING JURISDICTION
GOVERNING CODES
1. DC WIRING METHODS SHALL NOT BE INSTALLED WITHIN 10" OF
THE ROOF DECKING OR SHEATHING EXCEPT WHERE COVERED BY
THE PV MODULES AND EQUIPMENT (CEC 690.31(G))
2. AN ACCESS POINT SHALL BE PROVIDED THAT DOES NOT PLACE
THE GROUND LADDER OVER OPENINGS SUCH AS WINDOWS OR
DOORS ARE LOCATED AT STRONG POINTS OF BUILDING
CONSTRUCTION AND IN LOCATIONS WHERE THE ACCESS POINT
DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS
TREE LIMBS, WIRES, OR SIGNS (CRC R324.7.1)
3. ALL EQUIPMENT AND ASSOCIATED CONNECTIONS OF INVERTERS,
MODULES, PV SOURCE CIRCUITS, BATTERY CONNECTIONS, ETC.
AND ALL ASSOCIATED WIRING AND INTERCONNECTIONS SHALL BE
INSTALLED ONLY BY QUALIFIED PERSONNEL (CEC 690.4(C))
4. RAPID SHUTDOWN REQUIREMENTS: PV SYSTEMS INSTALLED ON
OR IN BUILDINGS SHALL INCLUDE A RAPID SHUTDOWN FUNCTION.
PV SYSTEM CONDUCTORS OF MORE THAN 5 FT INSIDE A BUILDING,
OR MORE THAN 10 FT FROM A PV ARRAY, SHALL BE LIMITED TO
NOT MORE THAN 30 VOLTS AND 240 VA WITHIN 10 SECONDS OF
RAPID SHUTDOWN INITIATION, IN ACCORDANCE WITH CEC 690.12 DRI
VEWAYMA
R
C
Y
CT.
94'-8"
127'-10"
8'-0"
140'-7"
42'-11"
20'-8"
51'-2"
9'-7"
18'-0"
Abby Ayende
10/16/17
MP
PV
L C
J B
J B
JPH
G-3
SHEET NUMBER:
DRAWN BY:
DATE:
REV:
10/11/17
10/16/17PROJECT:CS PROJECT ID: 3019-SJHSU, DARREN & SANDY21074 MARCY CT.,CUPERTINO, CA 95014(408) 368-8552CLEAN
SOLAR INC.
1445 KOLL CIRCLE.,
SUITE 109
San Jose, CA. 95112
Cont. Lic # 910849
www. cleansolar.com
MP
PVLC
SERVICE POINT &
UTILITY METERING
DEDICATED PV LOAD CENTER
CONDUIT RUN
FIRE ACCESS POINT
FOR ACCESS LADDER
PER CFC 605.11.1.1
(14) (N) SOLAR MODULES PAIRED WITH
(14) (N) MICROINVERTERS TO BE
MOUNTED UNDER ARRAY
PITCH: 18°
AZIMUTH: 241°
TOTAL AREA OF ARRAY: 258 FT²
ROOF PLAN
SCALE: 3/32" = 1'-0"
EQUIPMENT LEGEND
JB JUNCTION BOX
(E) MAIN SERVICE PANEL
(N) PV LOAD CENTER
(N) CONDUIT
LICENSE HOLDER'S
SIGNATURE
ROOF VENTS, OBSTRUCTIONS
EXISTING
RESIDENCE
(E) #6 WATER PIPE BOND
1ST STORY
COMPOSITION
SHINGLE ROOF
CONDUIT TO BE RUN ON CONDUIT
BLOCKS MIN. 1" ABOVE ROOF SURFACE,
CLOSE TO RIDGE LINES, AND UNDER
EAVES; DC CONDUIT TO BE LABELED AT
MAX 10' INTERVALS
CONDUIT RUNS ARE APPROXIMATE AND
ARE TO BE DETERMINED IN THE FIELD BY
THE INSTALLERS
36"
36"
36"
36"
Abby Ayende
10/16/17
(1) 5/16" x 4-3/4" SS LAG BOLT
MIN. 2-1/2" EMBEDMENT
FLASHFOOT-2 ALUMINUM FLASHING
WITH INTEGRATED RUBBER BUSHING
CAPFOOT
NEOPRENE BONDED SEALING WASHER
GROUNDING MODULE CLAMP
IRONRIDGE XR10 RAIL
JPH
S-1
SHEET NUMBER:
DRAWN BY:
DATE:
REV:
10/11/17
10/16/17PROJECT:CS PROJECT ID: 3019-SJHSU, DARREN & SANDY21074 MARCY CT.,CUPERTINO, CA 95014(408) 368-8552IRONRIDGE
XR10 RAIL
LICENSE HOLDER'S
SIGNATURE
CLEAN
SOLAR INC.
1445 KOLL CIRCLE.,
SUITE 109
San Jose, CA. 95112
Cont. Lic # 910849
www. cleansolar.com
FOOTINGS
@ MAX. 72" OC
SCALE: 5/64" = 1'-0"
NTSNTS
ELEVATION DETAIL ATTACHMENT DETAIL
PARTIAL FRAMING PLANWEIGHT CALCULATIONS
COMPOSITION SHINGLE
24" EAVE OVERHANG
WIND BRACE 2" x 4" x 5'
EXTERIOR WALLS
3" - 6"
RAFTERS
2" x 6" @ 24" OC
13'-8"
13'-4"
25'-9"
27'-0"
13'-8"
40'-0"
RIDGE BEAM 2" x 6"
COLLAR TIE @ 48"
RAFTERS 2" x 6" @ 24" OC
CROSS BEAM @ 10'-0"
LOAD BEARING
WALL @ 12'-0"
SPAN @ 10' SPAN @ 10'
Abby Ayende
10/16/17
UTILITY SERVICE
120/240V 1 ɸ
(E) MAIN METER
(E) STAB-LOK
125A SERVICE PANEL
(NO MAIN BREAKER)
G
(N) JBOX
NEMA 3R
G
[A] WIRES IN FREE AIR
* (2) #12 AWG WIRE
IN ENGAGE Q-CABLE UV RATED SHEATHING
[B] 1/2" EMT CONDUIT
* (4) #10 AWG THWN-2 WIRE
(1) #8 AWG THWN-2 EGC
BRANCH CIRCUIT 1:
(10) LG ELECTRONICS LG320N1K-A5 MODULES PAIRED WITH
(10) ENPHASE IQ6PLUS-72-2-US (240V) MICROINVERTERS
G
(N) PV OCPD
2P 20A
ENVOY-IQ
MONITOR
(N) OCPD
1P 5A
CT
(N) PV OCPD
2P 20A
[C] 3/4" EMT CONDUIT
(3) #8 AWG THWN-2 WIRE
(1) #8 AWG THWN-2 EGC
(N) PV OCPD
2P 40A ¹
BRANCH CIRCUIT 2:
(4) LG ELECTRONICS LG320N1K-A5 MODULES PAIRED WITH
(4) ENPHASE IQ6PLUS-72-2-US (240V) MICROINVERTERS
** #6 AWG
BARE COPPER
EGC
(N) 60A 240V
PV LOAD CENTER
MICROINVERTER AC
COMBINER WITH INTEGRATED
MONITORING, NEMA-3R
(N) #6 GROUND ROD +
(N) #6 SUPPL. GROUND ROD +
(E) #6 WATER HEATER BOND
(N) OCPD
2P 100A
JPH
E-1
SHEET NUMBER:
DRAWN BY:
DATE:
REV:
10/11/17
10/16/17PROJECT:CS PROJECT ID: 3019-SJHSU, DARREN & SANDY21074 MARCY CT.,CUPERTINO, CA 95014(408) 368-8552LICENSE HOLDER'S
SIGNATURE
CLEAN
SOLAR INC.
1445 KOLL CIRCLE.,
SUITE 109
San Jose, CA. 95112
Cont. Lic # 910849
www. cleansolar.com
ELECTRICAL LINE DIAGRAM
¹ THE 120% RULE PER NEC 705.12(D) IS ONLY APPLICABLE TO LOAD-SIDE CONNECTIONS; PV TIE-IN AT THE
BREAKER IS CONSIDERED A SUPPLY-SIDE CONNECTION ON A 6-HANDLE/ NO-MAIN-BREAKER SERVICE PANEL - IN
THIS INSTANCE, THE PV BREAKER COUNTS AS ONE OF THE (6) ALLOWED MAIN DISCONNECT SWITCHES PER
230.71(A). SUPPLY-SIDE CONNECTIONS ARE TO COMPLY WITH NEC 705.12(A): THE PV BREAKER CANNOT
EXCEED THE SERVICE SIZE AND IS NOT SUBJECT TO THE 120% RULE
NOTES:
· MODULES ARE BONDED TO RAIL USING UL 2703 RATED BONDING SYSTEM - INTEGRATED BONDING MID-CLAMPS + DIRECT-BURIAL LAY-IN-LUGS; SEE ATTACHED FOR SPECIFICATIONS
· WHEN UTILIZING THE 120% RULE, BACKFED PV BREAKERS WILL BE INSTALLED AT OPPOSITE END OF THE BUS BAR FROM THE MAIN BREAKER. A PERMANENT WARNING LABEL TO BE INSTALLED PER SYSTEM
SIGNAGE, SHEET F-1
· PV DC SYSTEM IS UNGROUNDED
· BACKFED PV BREAKER WILL BE INSTALLED AT OPPOSITE END OF THE BUS BAR FROM THE MAIN BREAKER. A PERMANENT WARNING LABEL TO BE INSTALLED PER SYSTEM SIGNAGE, SHEET F-1
· WHEN PRESENT, THE GEC TO BE CONTINUOUS AS PER CEC 250.64(C) AND TO TERMINATE AT A GROUNDING ELECTRODE
· FOR ALL SYSTEMS OVER 250V, CONCENTRIC AND ECCENTRIC KNOCKOUTS SHALL BE PROPERLY BONDED
· INVERTER(S) TO BE COMPLIANT WITH UL 1741 SUPPLEMENT A
* THE ENPHASE IQ MICROINVERTER SYSTEM USES A DG TYPE CABLE AND CONTAINS ONLY TWO #12 AWG LINE CONDUCTORS. THE Q CABLE MALE CONNECTORS PLUG DIRECTLY INTO THE IQ MICROS, WHOSE DOUBLE
INSULATION RATING REQUIRES NO NEUTRAL OR GROUND CONDUCTORS; LINE-TO-LINE COMMUNICATIONS INSTEAD OF THE NEUTRAL IS USED TO DETERMINE GRID VALUES. THIS FUNCTIONALITY IS PART OF ITS UL
LISTING.
** GROUND PATH IS AS FOLLOWS: THE IQ 6 MICRO AND THE IQ 6+ MICRO DO NOT REQUIRE GROUNDING ELECTRODE CONDUCTORS (GEC) OR EQUIPMENT GROUNDING CONDUCTORS (EGC); MICROINVERTER MOUNTING
BRACKET IS BONDED VIA UL 2703 HARDWARE CONNECTION TO RACKING; INTEGRATED BONDING CLAMPS BOND MODULE FRAMES TO RACKING; RACKING IS BONDED TO BARE WIRE EGC VIA UL 2703 LISTED
HARDWARE
Abby Ayende
10/16/17
JPH
E-2
SHEET NUMBER:
DRAWN BY:
DATE:
REV:
10/11/17
10/16/17PROJECT:CS PROJECT ID: 3019-SJHSU, DARREN & SANDY21074 MARCY CT.,CUPERTINO, CA 95014(408) 368-8552LICENSE HOLDER'S
SIGNATURE
CLEAN
SOLAR INC.
1445 KOLL CIRCLE.,
SUITE 109
San Jose, CA. 95112
Cont. Lic # 910849
www. cleansolar.com
ELECTRICAL CALCULATIONS Abby Ayende
10/16/17
JPH
F-1
SHEET NUMBER:
DRAWN BY:
DATE:
REV:
10/11/17
10/16/17PROJECT:CS PROJECT ID: 3019-SJHSU, DARREN & SANDY21074 MARCY CT.,CUPERTINO, CA 95014(408) 368-8552CLEAN
SOLAR INC.
1445 KOLL CIRCLE.,
SUITE 109
San Jose, CA. 95112
Cont. Lic # 910849
www. cleansolar.com
LICENSE HOLDER'S
SIGNATURE
CAUTION
POWER TO THIS BUILDING IS ALSO SUPPLIED
FROM THE FOLLOWING SOURCES WITH
DISCONNECTS LOCATED AS SHOWN:
21074 MARCY CT.,
CUPERTINO, CA 95014
PV SOLAR ARRAY
K
PV LOAD CENTER
SIGNAGE FORMAT: ALL LETTERS SHALL BE CAPITALIZED, 3/8" WHITE LETTERING ON RED BACKGROUND, ARIAL OR SIMILAR FONT, NON-BOLD; REFLECTIVE, ON WEATHER- RESISTANT MATERIAL SUITABLE FOR THE
ENVIRONMENT (USE UL-969 AS STANDARD FOR WEATHER RATING) WILL BE USED; DURABLE ADHESIVE MATERIALS MEET THIS REQUIREMENT.
TO BE PLACED JUNCTION BOXES, DISCONNECTS, RACEWAYS,
ENCLOSURES AND CABLE ASSEMBLIES; MARKING SHALL BE PLACED
ON INTERIOR AND EXTERIOR DC CONDUIT, RACEWAYS, ENCLOSURES
AND CABLE ASSEMBLIES EVERY 10 FEET, WITHIN 1 FOOT OF TURNS
OR BENDS AND WITHIN 1 FOOT ABOVE AND BELOW PENETRATIONS
OF ROOF/CEILING ASSEMBLIES, WALLS OR BARRIERS:
WARNING: PHOTOVOLTAIC POWER SOURCE
CAUTION - PHOTOVOLTAIC AC DISCONNECT
PV SYSTEM DC DISCONNECT
RATED MAX POWER-POINT CURRENT - 9.62 A
RATED POWER-POINT VOLTAGE - 33.3 V
MAXIMUM SYSTEM VOLTAGE - 46.5 V
SHORT CIRCUIT CURRENT - 12.74 A
WARNING DUAL POWER SOURCES
SECOND SOURCE IS PHOTOVOLTAIC SYSTEM
RATED AC OUTPUT CURRENT: 16.4 A
NORMAL OPERATING AC VOLTAGE: 240 V
B
TO BE INSTALLED AT THE MAIN ELECTRICAL SERVICE
AND SUBPANEL TIE-IN LOCATIONS:
TO BE INSTALLED AT THE MAIN SERVICE PANEL,
AC DISCONNECT, AND SUBPANEL TIE-IN LOCATIONS:
TO BE INSTALLED NEXT TO THE PV BREAKER AT THE
MAIN ELECTRICAL SERVICE AND SUBPANEL TIE-IN LOCATIONS:
C
A
WARNING: ELECTRIC SHOCK HAZARD
IF A GROUND FAULT IS INDICATED,
NORMALLY GROUNDED CONDUCTORS MAY BE
UNGROUNDED AND ENERGIZED
TO BE INSTALLED AT THE INVERTER
(GROUNDED SYSTEMS, NEAR GROUND FAULT INDICATOR):
F
TO BE INSTALLED AT THE DC DISCONNECT:
TO BE INSTALLED AT THE AC DISCONNECT:
WARNING: ELECTRIC SHOCK HAZARD. THE DC
CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM
ARE UNGROUNDED AND MAY BE ENERGIZED
IN THE OPEN POSITION
TO BE INSTALLED AT THE JUNCTION BOXES, INVERTER,
AND DC DISCONNECT (UNGROUNDED SYSTEMS):
G
D
I
J
ELECTRIC SHOCK HAZARD
NO USER SERVICEABLE PARTS INSIDE
CONTACT AUTHORIZED SERVICER FOR ASSISTANCE
TO BE INSTALLED AT THE JUNCTION BOXES:
E
WARNING - INVERTER OUTPUT CONNECTION. DO NOT
RELOCATE THIS OVERCURRENT DEVICE
TO BE INSTALLED AT THE ELECTRICAL SERVICE: A DIRECTORY
PLACARD INDICATING LOCATION OF SERVICE AND PV SYSTEM
DISCONNECTING MEANS IF NOT AT THE SAME LOCATION
WARNING: ELECTRIC SHOCK HAZARD - DO NOT TOUCH
TERMINALS - TERMINALS ON BOTH THE LINE AND THE
LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION
TO BE INSTALLED AT THE DC DISCONNECT:
H
SIGNAGE
PHOTOVOLTAIC SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
TO BE PLACED AT THE SERVICE DISCONNECT:
L
SIGNAGE LOCATIONS - MICROINVERTER SYSTEM
PV ARRAY JUNCTION BOX PV LOAD CENTER
(WHEN PRESENT)
AC DISCONNECT
(WHEN PRESENT)
PV METER
(WHEN PRESENT)
MAIN SERVICE
PANEL
E
SUBPANEL
(WHEN PRESENT)
A A
A
BC
C
C
C
D
DDD
I K
L
SERVICE POINT &
UTILITY METERING
Abby Ayende
10/16/17
PHOTOVOLTAIC MODULE SPECIFICATIONS
JPH
Z-1
SHEET NUMBER:
DRAWN BY:
DATE:
REV:
10/11/17
10/16/17PROJECT:CS PROJECT ID: 3019-SJHSU, DARREN & SANDY21074 MARCY CT.,CUPERTINO, CA 95014(408) 368-8552CLEAN
SOLAR INC.
1445 KOLL CIRCLE.,
SUITE 109
San Jose, CA. 95112
Cont. Lic # 910849
www. cleansolar.com
Abby Ayende
10/16/17
INVERTER SPECIFICATIONS
JPH
Z-2.1
SHEET NUMBER:
DRAWN BY:
DATE:
REV:
10/11/17
10/16/17PROJECT:CS PROJECT ID: 3019-SJHSU, DARREN & SANDY21074 MARCY CT.,CUPERTINO, CA 95014(408) 368-8552CLEAN
SOLAR INC.
1445 KOLL CIRCLE.,
SUITE 109
San Jose, CA. 95112
Cont. Lic # 910849
www. cleansolar.com
Abby Ayende
10/16/17
UL 1741 SA COMPLIANCETRUNK CABLE SPECIFICATIONS
JPH
Z-2.2
SHEET NUMBER:
DRAWN BY:
DATE:
REV:
10/11/17
10/16/17PROJECT:CS PROJECT ID: 3019-SJHSU, DARREN & SANDY21074 MARCY CT.,CUPERTINO, CA 95014(408) 368-8552CLEAN
SOLAR INC.
1445 KOLL CIRCLE.,
SUITE 109
San Jose, CA. 95112
Cont. Lic # 910849
www. cleansolar.com
Abby Ayende
10/16/17
FOOTING SPECIFICATIONS
JPH
Z-3
SHEET NUMBER:
DRAWN BY:
DATE:
REV:
10/11/17
10/16/17PROJECT:CS PROJECT ID: 3019-SJHSU, DARREN & SANDY21074 MARCY CT.,CUPERTINO, CA 95014(408) 368-8552CLEAN
SOLAR INC.
1445 KOLL CIRCLE.,
SUITE 109
San Jose, CA. 95112
Cont. Lic # 910849
www. cleansolar.com
Abby Ayende
10/16/17
JPH
Z-4.1
SHEET NUMBER:
DRAWN BY:
DATE:
REV:
10/11/17
10/16/17PROJECT:CS PROJECT ID: 3019-SJHSU, DARREN & SANDY21074 MARCY CT.,CUPERTINO, CA 95014(408) 368-8552RACKING SPECIFICATIONS
CLEAN
SOLAR INC.
1445 KOLL CIRCLE.,
SUITE 109
San Jose, CA. 95112
Cont. Lic # 910849
www. cleansolar.com
Abby Ayende
10/16/17
JPH
Z-4.2
SHEET NUMBER:
DRAWN BY:
DATE:
REV:
10/11/17
10/16/17PROJECT:CS PROJECT ID: 3019-SJHSU, DARREN & SANDY21074 MARCY CT.,CUPERTINO, CA 95014(408) 368-8552CLEAN
SOLAR INC.
1445 KOLL CIRCLE.,
SUITE 109
San Jose, CA. 95112
Cont. Lic # 910849
www. cleansolar.com
RACKING ENGINEERINGAbby Ayende
10/16/17
JPH
Z-4.3
SHEET NUMBER:
DRAWN BY:
DATE:
REV:
10/11/17
10/16/17PROJECT:CS PROJECT ID: 3019-SJHSU, DARREN & SANDY21074 MARCY CT.,CUPERTINO, CA 95014(408) 368-8552CLEAN
SOLAR INC.
1445 KOLL CIRCLE.,
SUITE 109
San Jose, CA. 95112
Cont. Lic # 910849
www. cleansolar.com
RACKING FIRE RATINGRACKING ENGINEERING Abby Ayende
10/16/17
JPH
Z-5.1
SHEET NUMBER:
DRAWN BY:
DATE:
REV:
10/11/17
10/16/17PROJECT:CS PROJECT ID: 3019-SJHSU, DARREN & SANDY21074 MARCY CT.,CUPERTINO, CA 95014(408) 368-8552GROUNDING & BONDING SPECIFICATIONS
CLEAN
SOLAR INC.
1445 KOLL CIRCLE.,
SUITE 109
San Jose, CA. 95112
Cont. Lic # 910849
www. cleansolar.com
Abby Ayende
10/16/17
JPH
Z-5.2
SHEET NUMBER:
DRAWN BY:
DATE:
REV:
10/11/17
10/16/17PROJECT:CS PROJECT ID: 3019-SJHSU, DARREN & SANDY21074 MARCY CT.,CUPERTINO, CA 95014(408) 368-8552GROUNDING & BONDING SPECIFICATIONS
CLEAN
SOLAR INC.
1445 KOLL CIRCLE.,
SUITE 109
San Jose, CA. 95112
Cont. Lic # 910849
www. cleansolar.com
Abby Ayende
10/16/17
JPH
Z-6.1
SHEET NUMBER:
DRAWN BY:
DATE:
REV:
10/11/17
10/16/17PROJECT:CS PROJECT ID: 3019-SJHSU, DARREN & SANDY21074 MARCY CT.,CUPERTINO, CA 95014(408) 368-8552CLEAN
SOLAR INC.
1445 KOLL CIRCLE.,
SUITE 109
San Jose, CA. 95112
Cont. Lic # 910849
www. cleansolar.com
PV LOAD CENTER SPECIFICATIONSPV LOAD CENTER SPECIFICATIONS Abby Ayende
10/16/17
JPH
Z-6.2
SHEET NUMBER:
DRAWN BY:
DATE:
REV:
10/11/17
10/16/17PROJECT:CS PROJECT ID: 3019-SJHSU, DARREN & SANDY21074 MARCY CT.,CUPERTINO, CA 95014(408) 368-8552CLEAN
SOLAR INC.
1445 KOLL CIRCLE.,
SUITE 109
San Jose, CA. 95112
Cont. Lic # 910849
www. cleansolar.com
MONITORING SPECIFICATIONSAbby Ayende
10/16/17