Loading...
approved plans a � SYMBOLS PROJECT DATA DRAWING INDEX � a o • N � � c� � - GRID LINE- F.O.S. UNLESS OTHERWISE NOTED LOCATION: 10800 PENINSULAR AVENUE A0.0 COVER SHEET ,-- _,, o CUPERTINO, CA / � � `" 95014 A1.0 SITE PLAN �^ �} o w �� DIMENSION TO FACE OF FRAMING L.Q�]�I�.J n I��I ❑eV I�� � i��,,� ' I l m � n � APN: 326-03-048 A2.0 EXISTING FDN /BASEMENT PLAN � � ��� _. � z o � � „„-,,�-„,,� A2.1 EXISTING FIRST FLOOR PLAN � ���; � O - ��- DIMENSION TO CENTERLINE � P I��n I ❑� �I��� c� ZONING: Q � P (R1) A2.2 EXISTING SECOND FLOOR PLAN W � I � LOT SIZE: 8,250 SQ. FT. (ACTUAL � A2.3 EXISTING THIRD FLOOR PLAN �'� �� � DIMENSION TO FACE OF FINISH 4,72 SQ. . N A2.4 EXISTING ROOF PLAN �u��RT l N Q � j � 1 �l � � z � BLDG USE: � A2.5 PROPOSED FDN/BASEMENT PLHN AP � i� ( O , ,: � U LAND USE DESIGNATION: 1� � LOW DENSITY RESIDENTIAL 1-5 (DU/Ac)�f2.6 PROPOSED FIRST FLOOR PLAN � ��� � ����PA��Y: � Ca se # D I R-201 -09 ' • * DETAIL REFERENCE SHEET LOCATION �� o � 8�1 CONSTRUCTION TYPE TYPE V-B A3.0 EXISTING ELEVATIONS \ � z CLIMATE ZONE: NA A3.1 PROPOSED ELEVATIONS Ap liC tioi� Numher�s} U � BLDG. CODE: 2013 CRC, CMC, CPC, CFC, � � 1 INTERIOR ELEVATION KEY CECAND 2012 CAENERGY CODE GL�YTON D�51G � O 7.1 AND SHEET LOCATION Appro�a I Bo dy: Di r ctor I��F�I G�5 o v FIRE SPRINKLERS: ~ PROJECT SCOPE: ADDITION OF 130 SQ FTTO (E) r15t0 her Gla tOn, � U � 10 DOOR NUMBER, SEE DOOR SCHEDULE GROUND FLOOR LIVING ROOM INCL. p y � A ro�ra I Date 08 /�l' . � � STAIRS TO EXISTING BASEMENT. �:� pp d r�i viii��.v�, r�ir�, �-�-�-ai r�i * 101 WINDOW NUMBER, SEE WINDOW SCHEDULE REMODEL/ EXPANSION OF (E) � � . KITCHEN. �I nature Beth E� en G� Lic. # G-3 2 '7 40 I Q PROPOSED FLOOR AREA. g � � ELEVATION DATUM POINT y � (E) BASEMENT: 591 Sq. Ft. (DOES NOT COUNT) �n morenc r�1� �an J�os�e� G� q 5 1 1 8 � � (E) FIRST FLOOR&ATTACHED GARAGE: 1,54s sq. Fc. (4 O S) 6 6 6-8 5 4 4 • A4.1 CROSS SECTION SHEET LOCATION (E) SECOND FLOOR: 644 Sq. Ft. � n (E)THIRD FLOOR: 306 Sq. Ft. �� � EXTERIOR ELEVATION + (N)ADDITION: 130 Sq. Ft. m � ( � I O � / � � O A3.1 EXISTING TOTAL: 2,496 Sq. Ft. Q � � � � � 00.00' SPOT ELEVATION PROPOSED TOTAL: 2,626 SQ. FT. � BUILDING LOT COVERAGE: U � O � O O � � I � � � � � � � � � � 1❑ DRAWING KEYNOTE � � PROPOSED HOUSE FOOTPRINT: 1,676 Sq. Ft. � (E) SHEDS: 160 Sq. Ft. � MATCH LINE OVERHANGS/ EAVES/PATIOS: 1,215 Sq. Ft. � GU � � T11�10 G � � � O 1 � ��" PROPOSED TOTAL LOT COVERAGE: 3,051 Sq. Ft. � U � �2 DRAWING REVISION PROPOSED FAR: 2626/4725=0.56 � ALLOWABLE FAR: 45% = 0.45*4725 = 2126.25 w � z c� � w ❑ z GENERAL NOTES ABBREVIATIONS DIRECTORY GREEN BUILDING NOTES 0 Q A�PN: 326-03-048 J U � COORDINATION ENERGY A.F.F. ABOVE FINISHED FLOOR J.H. JOIST HANGER OWNER: MR PETER CHAN & MS TET LIEW LANDSCAPE/SITE � AB ANCHOR BOLT JB JUNCTION BOX 10800 PENINSULARAVENUE � 1. IF THESE DRAWINGS ARE NOT 24"x 36"THEY HAVE BEEN REDUCED OR ENLARGED 20. THIS BUILDING MEETS THE ENERGY BUILDING DESIGN REQUIREMENTS OF TITLE 24 PART 6. ABV. ABOVE JST. JOIST CUPERTINO, CA 95014 1. DIVERT 50% (BY WEIGHT) OF ALL CONSTRUCTION AND i�ROJ�GT LOG�TIOI�I: � TEL: #Client Phone Number DEMOLITION WASTE (RECYCLING OR WASTE) (CALGREEN CODE) o SEE SHEET# FOR CERTIFICATE OF COMPLIANCE. AC AIR CONDITIONING JT JOINT 2. THE STANDARD A.I.A. GENERAL CONDITIONS ARE HEREBY MADE A PART OF THESE DRAWINGS � ADJ. ADJUSTABLE K.D. KILD DRIED EMAIL: #Client E-mail 2.TURF SHALL NOT BE INSTALLED ON SLOPES EXCEEDING 10% 0 3.ALL WORK SHALL COMPLY WITH THE 2013 RESIDENTIAL CODE , 2013 CALIFORNIA MECHANICAL 21.ALL WINDOWS AND DOORS SHALL BE DOUBLE GLAZED U.O.N. ALUM. ALUMINUM L.H. LEFT HAND CLAYTON DESIGN SERVICES AND NO OVERHEAD SPRINKLERS INSTALLED IN AREAS LESS THAN Y CODE, 2013 CALIFORNIA PLUMBING CODE, 2013 CALIFORNIA ELECTRICAL CODE, 2012 ASPH. ASPHALT LAV. LAVATORY ARCHITECT: 8'-0"WIDE 0 22. FOR PROJECTS IN CALIFORNIA: CALIFORNIA ENERGY CODE, 2013 CALIFORNIA GREEN BUILDING CODE AND 2013 CALIFORNIA B.O. BOTTOM OF LT. LIGHT 1330 MONTMORENCY DRIVE m FIRE CODE B.U.R. BUILT-UP ROOFING MAX. MAXIMUM SAN JOSE, CALIFORNIA 95118 3.TURF IS A SMALL PERCENTAGE OF THE LANDSCAPE AREA(2 � � A. INSULATION SHALL MEET THE CALIFORNIA ENERGY COMMISSION (C.E.C.)QUALITY TEL: 408 666-8544 POINTS FOR 25/o, o) � BD BOARD MED. MEDIUM � ) <- ° 4 POINTS FOR<_10°/ STANDARDS AND BE CERTIFIED BY THE MANUFACTURER. BLDG. BUILDING MFR. MANUFACTURER @ Y J W � 4.ALL DIMENSIONS ARE TO FACE OF STUD OR FACE OF CONCRETE UNLESS OTHERWISE NOTED EMAIL: chris cla tondesi ns.com o BLKG. BLOCKING MIN. MINIMUM 4. IRRIGATION SYSTEM SHALL HAVE SMART(WEATHER BASED) � 5. DO NOT SCALE DRAWINGS FOR DIMENSIONS. WRITTEN DIMENSIONS SHALL TAKE B.ALL FREEZERS, REFRIGERATORS,AND FLUORESCENT LAMP BALLASTS SHALL BE OWNER TO SELECT CONTROLLER (CALGREEN CODE) � ��v, CERTIFIED BY THE C.E.C. BLW. BELOW MIR. MIRROR GENERAL CONTRACTOR: � PRECEDENCE OVER SCALED DIMENSIONS BM. BEAM MTD. MOUNTED XXX � � � `� XXX WATER EFFICIENT FIXTURES � C.ALL HVAC EQUIPMENT, WATER HEATERS, FAUCETS,AND SHOWER HEADS SHALL BE BRZ. BRONZE MTL. METAL O 6. DISCREPANCIES BETWEEN THESE DRAWINGS AND ACTUAL SITE CONDITIONS SHALL BE CERTIFIED BY THE C.E.C. BTW. BETWEEN N NEW XXX � BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO COMMENCEMENT OF ANY WORK � ) 1. HIGH EFFICIENCY SHOWERHEADS <_2.0 GALLONS PER MIN. � C.I. CAST IRON N.T.S. NOT TO SCALE XXX (GPM)AT 80 PSI. (MULTIPLE SHOWERHEADS SHALL NOT EXCEED � Q � � Q 23.ALL TOILETS ARE TO BE ULTRA LOW FLOW 1.28 GALLONS MAXIMUM FLUSH CAPACITY PER O a 7. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS AND OR SAMPLE BOARDS TO ARCHITECT CPC 402.2.2 C.I.P. CAST IN PIPE NIC NOT IN CONTRACT XXX MAXIMUM FLOW RATES) (CALGREEN) J PRIOR TO ORDERING AND OR INSTALLATION FOR C.O. CLEAN OUT O/ OVER STRUCTURAL ENGINEER: � � � -ALL MILLWORK(CUSTOM OR FACTORY PRODUCED)WITH COUNTER MATERIAL CAB. CABINET OC ON CENTER XXX 2. USE HIGH EFFICIENCY BATHROOM FAUCETS <_ 1.5 GPM AT 60 PSI � 24. THERMOSTATS SHALL BE OF A PROGRAMMABLE DUAL SET BACK TYPE. � -ALL EXTERIOR WINDOWS/DOORS WITH FIN. SAMPLES CL CENTER LINE OPG. OPENING XXX (CALGREEN) -ALL INTERIOR DOORS WITH FIN. SAMPLES 25. WATER HEATER SHALL BE INSULATED WITH R-12 BLANKETAND PIPES WITHIN FIRST FIVE CLG. CEILING P.T. PRESSURE TREATED XXX - � � -WOOD SIDING (CONNECTION AND CORNERS)WITH FIN. SAMPLES XXX 3. USE HIGH EFFICIENCY KITCHE AND UTILITY FAUCETS <_ 1.8 GPM � FEET OF TANK WITH R-4 CLO. CLOSET PL. PLATE -ALL TILE WORK 12"X12" MOCKUP (INTERIOR AND EXTERIOR) (CALGREEN) (y � � -EXTERIOR STUCCO 24"X24" MOCKUP CLR. CLEAR PLAM. PLASTIC LAMINATE �� -EXPOSED FLASHING ELEMENTS (SAMPLE) 26. GENERAL LIGHTING IN KITCHENS AND BATHS SHALL BE HIGH EFFICACY& COMPLY w/TITLE 24 CMU CONCRETE MASONRY UNIT PLYWD.PLYWOOD LANDSCAPE ARCHITECT: XXX 4. INSTALL ONLY HIGH EFFICIENCY TOILETS (DUAL-FLUSH OR<_ 1.28 � � CALCULATIONS -EXPOSED ROOFING (SAMPLE) COL. COLUMN PNL. PANEL XXX GALLENS PER FLUSH (GPF) (CALGREEN) � � 0 CONC. CONCRETE PR. PAIR XXX CONTRACTOR DUTIES LIFE SAFETY CONT. CONTINUOUS PTD. PAINTED XXX HVAC � � Z � CSK. COUNTERSINK R RISER XXX 7. THE CONTRACTOR SHALL: CSMT. CASEMENT R.H. RIGHT HAND 1. INSTALL ENERGY STAR BATHROOM FANS ON TIMER OR O � � 27. WHERE REQUIRED BY LOCAL JURISDICTIONS, BUILDINGS TO BE FULLY SPRINKLERED IN CLAYTON DESIGN SERVICES HUMIDISTAT CALGREEN A. FURNISH, PAY FOR,AND FILE ALL NECESSARY PERMITS, FEES, INSPECTIONS, ETC. ACCORDANCE w/2013 CRC SEC. R-313/R-309.6 AND 2010 NFPA. DRAWINGS TO BE SUBMITTED CTR. CENTER R.O. ROUGH OPENING LIGHTING DESIGNER: � � (�/ FOR PERMIT BY DESIGN/BUILD SUBCONTRACTOR CW COLD WATER R.W.L. RAIN WATER LEADER 1330 MONTMORENCY DRIVE _ � � !L EXCEPT FOR PLAN CHECK, ZONING,AND SCHOOL FEES WHICH WILL BE PAID FOR BY SAN JOSE, CALIFORNIA 95118 2. INSTALL WHOLE HOUSE FAN (CALGREEN) THE OWNER DF DOUGLAS FIR RAD. /R. RADIUS (� O � 28. SMOKE DETECTORS SHALL BE HARD-WIRED IN CEILINGS AND EQUIPPED w/A BATTERY DH DOUBLE HUNG REINF. REINFORCED TEL: (408)666-8544 3. COMPLIANCE W/ASHREA 62.2 MECHANICAL VENTILLATION � N � B. GUARANTEE ALL WORK FOR ONE YEAR AS EVIDENCED BY THE DATE OF THE FINAL BACKUP. SEE REFLECTED CEILING AND MECHANICAL PLANS FOR EXACT LOCATIONS --2013 CRC DIA. DIAMETER REQ'D REQUIRED EMAIL: chris@claytondesigns.com STANDARDS (AS ADOPTED IN TITLE 24 PART 6) CERTIFICATE OF PAYMENT SEC.314 DIM. DIMENSION RESIL. RESILIENT � O � 29.ALL SMOKE DETECTORS TO BE WIRED FOR 24 HOUR MONITORING BY REMOTE ANSWERING DISP. GARBAGE DISPOSAL RM. ROOM CIVIL ENGINEER: XXX FINISHES = ,� (� � 1 C. PROVIDE RELEASE OF ALL SUBCONTRACTOR AND SUPPLIER LIENS BEFORE FINAL DN. DOWN RWD. REDWOOD XXX � O t� STATION PER NFPA 72 PAYMENT IS MADE DR. DOOR S.A.D. SEE ARCHITECTURAL XXX 1. USE LOW-VOC. CAULKS, CONSTRUCTION ADHESIVES AND DTL DETAIL DRAWINGS XXX SEALANTS THAT MEET SCAQMD RULE 1168 (CALGREEN) D. FILE WORKMAN'S COMPENSATION XXX � MEP DW DISHWASHER S.C. SOLID CORE 2. REDUCE FORMALDEHYDE IN INTERIOR FINISH - MEET E.ARRANGE FOR ALL INSPECTIONS AS CALLED FOR IN SECTION 108.4 OF THE 2007 CABC DWG. DRAWING S.C.D. SEE CIVIL DRAWINGS XXX CURRENT(ATCM) FOR COMPOSITE WOOD (CALGREEN) 30.ALL GAS APPLIANCES SHALL HAVE GAS IGNITER TYPE PILOTS AND INTERMITTENT IGNITION DWR. DRAWER S.L.D. SEE LANDSCAPE DEVICES XXXX 8. CONTRACTOR SHALL INSTALL ALL MATERIALS AND EQUIPMENT IN ACCORDANCE WITH (E) EXISTING DRAWINGS GEOTECHNICAL ENGINEER: 3.ALL CARPET AND 50% OF RESILIANT FLOORING IS LOW MANUFACTURER'S RECOMMENDATIONS AND ALLAPPLICABLE CODES EA. EACH S.P. SOLID PIPE XXX EMITTING (CALGREEN) 31. CLOTHES DRYERS SHALL BE VENTED TO THE OUTSIDE. PROVIDE BACKDRAFT DAMPER EL. ELEVATION S.S. STAINLESS STEEL 9. CONTRACTOR SHALL PROTECT EXISTING VEGETATION AND ADJACENT SITE IMPROVEMENTS 32. WATER HEATERS SHALL BE SECURELY FASTENED TO PREVENT OVERTURNING AS DETAILED ELEV. ELEVATOR(OR ELEVATION) S.S.D. SEE STRUCTURAL XXX GENERAL FROM DAMAGE DURING THE COURSE OF THE WORK ON DRAWING 2/A8.1 --2013 CRC R301.2.2.3.7 EQ EQUAL DRAWINGS EXP. EXPOSED S.T. STEEL TROWEL 1. CONTRACTOR SHALL DEVELOP A MANUAL OF GREEN 10. CONTRACTOR SHALL BRACE STRUCTUREAS REQUIRED DURING CONSTRUCTION 33.ALL HOT WATER FAUCETS WITH 10 FEET OR MORE OF PIPE BETWEEN FAUCETAND WATER EXT. EXTERIOR SH. SHELF FEATURES/BENEFITS (CALGREEN) Revisions: 11. CONTRACTOR SHALL PROVIDE STRICT CONTROL OF JOB CLEANUP TO REMOVE DUSTAND HEATERARE TO BE EQUIPPED WITH HOT WATER RECIRCULATING SYSTEM F.G. FINISHED GRADE/FIXED GLASS SHR. SHOWER DEBRIS FROM CONSTRUCTION AREA F.O.C. FACE OF CONCRETE SIM. SIMILAR VI C I N ITY MAP S P EC IAL N OTES 34.ALL SHOWERS AND TUB-SHOWER COMBINATIONS SHALL BE PROVIDED WITH INDIVIDUAL F.O.F. FACE OF FINISH SPK. SPEAKER PRELIMINARY PLANNING GOMMEhlTS 12.ALL SPECIAL INSPECTION AGENCIES, INDIVIDUALS,AND SHOP FABRICATORS SHALL BE CONTROL VALVES OF THE PRESSURE BALANCE OR THE THERMOSTATIC MIXING VALVE TYPE F.O.S. FACE OF STUD STL. STEEL �5/1/20 1 � APPROVED BY THE BUILDING DEPARTMENT PRIOR TO ANY WORK BEING PERFORMED. FD FLOOR DRAIN STN. STAIN - CONTRACTOR SHALL SUBMITALL DOCUMENTATION FOR APPROVAL 35.ALL HOSE BIBBS SHALL HAVE APPROVED NON-REMOVABLE BACKFLOW PREVENTION FDN. FOUNDATION T&G TONGUE & GROOVE _ -Verizon Store+._. � DEVICES --2013 CRC AP103.3 " 13. CONTRACTOR SHALL PROVIDE PLANS OF GAS LINE SIZING TO THE BUILDING INSPECTION FIN. FINISH T. TREAD '`` " ;_��,, . ,, : :_,, OFFICE PRIOR TO CALLING FOR INSPECTION 36. DUCTS SHALL BE CONSTRUCTED, INSTALLED AND INSULATED PER 2013 CMC FLR. FLOOR T.O. TOP OF :� Chain Reaction Bicy�c�les FRPR. FIREPROOFING T.O.C. TOP OF CONCRETE - O �+ GENERAL 37. EXHAUST SYSTEMS SHALL HAVE DAMPER CONTROLS FTG. FOOTING T.O.P. TOP OF PLATE ._ CCLC Preschool G.I. GALVANIZED IRON T.O.S. TOP OF STEEL/SLAB �= in Los Altos 14.ALL STAIRS WITH MORE THAN THREE RISERS SHALL HAVE ONE (1) 1-1/4"-2" DIAMETER 38.ALL ELECTRICAL OUTLETS IN EXTERNAL WALLS SHALL HAVE INSULATING GASKETS G.W.B. GYPSUM WALLBOARD T.O.W. TOP OF WALL � -- HANDRAIL w/ 1-1/2" CLEARANCE FROM THE WALL.ALL RAILS SHALL BE BETWEEN 34"AND 38" GA. GAUGE T.P.H. TOILET PAPER HOLDER Springwood Apartments __ ABOVE NOSING OF THE TREAD AND BE CONTINUOUS FROM THE TOP RISER TO THE BOTTOM 39. NO LIGHT FIXTURES IN CLOTHES CLOSETS SHALL BE CLOSER THAN 12"TO COMBUSTIBLE GL. GLASS T.S. TUBE STEEL RISER--####CRC SEC.311 STORAGE ITEMS--2013 CRC H.C. HOLLOW CORE THK. THICKNESS " H.W. HOT WATER TYP. TYPICAL t'�� 15. GUARDRAILS SHALL BE A MINIMUM OF 42" IN HEIGHTAND DESIGNED SUCH THATA4" SPHERE 40.ALL 120V/ 1-PH / 15-&20-AMP BRANCH CIRCUITS IN BEDROOMS SHALL BE PROTECTED BYA , �� CANNOT PASS THROUGH ANY OPENING --####CRC SEC.311 LISTED ARGFAULT CIRCUIT INTERRUPTER--2013 CEC ARTICLE 210.12 HB HOSEBIB U.O.N. UNLESS OTHERWISE ��. HDR. HEADER NOTED � � 16. FIREBLOCKING AND DRAFTSTOPPING SHALL BE PROVIDED IN ALL LOCATIONS IN 41. HYRO RADIANT, CONTRACTOR SHALL DOCUMENT AND PROVIDE DIMENSIONED DRAWING/ HOR. HORIZONTAL V.I.F. VERIFY IN FIELD � ° � � ACCORDANCE w/####CRC SEC.302 WITH PICTURES OR VIDEO FOR THE OWNER SHOWING LOCATIONS OF ALL IN FLOOR HYRO- HT HEIGHT V.T.R. VENT THROUGH ROOF People Greete � W RADIANT TUBING. HTR. HEATER VP VENT PIPE o � � �1Ufti el' 0 Penin5ular W � = 17. HEARTHS SHALL EXTEND 20" IN FRONT AND 12" BEYOND EACH SIDE OF FIREPLACE OPENING FRAMING PLANS AND LIGHTING COORDINATION I.D. INSIDE DIAMETER W.O. WHERE OCCURS � � °5erra Fv�,y SITE _ � � I.D. INSIDE DIAMETER W.P. WATERPROOFING � `� � � 18. FIREPLACE SHALL HAVE TIGHT FITTING METAL OR GLASS DOOR AND OUTSIDE AIR INTAKE INS. INSULATION W.S. WEATHER STRIPPING J � W WITH DAMPER AND CONTROL 1. CONTRACTOR SHALL REVEIW ALL RCP/LIGHTING PLANS PRIOR TO SETTING FLOOR/ROOF INT. INTERIOR W/ w�TH Print Date: 5/ 1 O/ 1 � m JOIST MEMBERS TO ALLOW FOR LIGHTING PLACEMENT AS SHOWN, CONTRACTOR SHALL � �' � = WC WATER CLOSET z a ~ 1 9.A L L G L A Z I N G S U B J E C T T O H U M A N I M P A C T S H A L L B E T E M P E R E D--####C R C S E C T I O N S SPOT LOCATE (PAINT OR OTHER MEANS)ALL RECESSED FIXTURES AND NOTIFY THE ARCHITECT WD. WOOD � s QW o R.308/R.327.8 FORA WALK THRU PRIOR TO SETTING OF CANS IN PERMANENT LOCATION. WDW. WINDOW J4n�pe�o PROJEGT #: 20 1 6 1 � Z m o ARCHITECT SHALL HAVE ACCESS TO THE SITE AT ALL TIMES WH WATER HEATER GS Serr a Fwy - � � � ou, ccZ - � � > � � c,e,t�n �, DR�YVN Y: G G w Q w - �;�:, . x � a > � � D�T�: q/2016 w � Z w Zw � _- Q � � Z _ � � w � � �y � GO��iZSH��T Ain Ainsw r `;;� zF � w ' ¢j Q U = z ,� SL�JOfrtll D� O [/j�, � � � o , � a ~ ~ N /� � } w = o Q � � � SHE�T #: /`�O . O w ~ F U _ � - , � O � O , � , � ., _. � ;-)i-"-i;.�i� � � SYMBOLS PROJECT DATA DRAWING INDEX Q � ^ a � . � � � co � - GRID LINE- F.O.S. UNLESS OTHERWISE NOTED LOCATION: 10800 PENINSULAR AVENUE A0.0 COVER SHEET ,-- _,, U o CUPERTINO, CA � � � `: 95014 A1.0 SITE PLAN �} � U �� DIMENSION TO FACE OF FRAMING �Q I�I�]�I�.J rI I��I ❑eV �'� ��T, �� ��� I l m � � � APN: 326-03-048 A2.0 EXISTING FDN /BASEMENT PLAN � � ��� _.� � z o � � 1 „v,,�,� A2.1 EXISTING FIRST FLOOR PLAN P I��n 1 ❑� �I���� ���� a � � ��- DIMENSION TO CENTERLINE ZONING: Q � P (R1) A2.2 EXISTING SECOND FLOOR PLAN w � I � LOT SIZE: 8,250 SQ. FT. (ACTUAL � A2.3 EXISTING THIRD FLOOR PLAN �'� �� � z z 4,72 SQ. . N ) A2.4 EXISTING ROOF PLAN � � � DIMENSION TO FACE OF FINISH 'C LJ�E RT l N Q � j � 1 �l � z � BLDG USE: A2.5 PROPOSED FDN/BASEMENT PLHN AP � i� ( O , ,: � U LAND USE DESIGNATION: 1� � LOW DENSITY RESIDENTIAL 1-5 (DU/Ac)�f2.6 PROPOSED FIRST FLOOR PLAN � ��� � ����PA��Y: � Ca se # D I R-201 -09 ' o * 8 � DETAIL REFERENCE SHEET LOCATION CONSTRUCTION TYPE TYPE V-B A3.0 EXISTING ELEVATIONS � �� � zC L I M A T E Z O N E: N A A3.1 PROPOSED ELEVATIONS Ap liC tioi� Numher�s} v a BLDG. CODE: 2013 CRC, CMC, CPC, CFC, � � 1 INTERIOR ELEVATION KEY CECAND 2012 CAENERGY CODE GL�Y T O N D�5 1G � O 7.1 AND SHEET LOCATION Appro�a I Bo dy: Di r ctor I��F�I G�5 o v FIRE SPRINKLERS: PROJECT SCOPE: ADDITION OF 130 SQ FTTO (E) r15t0 her Gla tOn, � � U � 10 DOOR NUMBER, SEE DOOR SCHEDULE O GROUND FLOOR LIVING ROOM INCL. � ro�ra I Date �� �� . � � � � STAIRS TO EXISTING BASEMENT. �:� pp dr�i viii��.v�, r�ir�, �-�-�-ai r�i * 101 WINDOW NUMBER, SEE WINDOW SCHEDULE REMODEL/EXPANSION OF (E) � � KITCHEN. �I nature Beth E� en G� Lic. # G-3 2 '7 40 I � PROPOSED FLOORAREA: g On YY101^enG rIV � � ELEVATION DATUM POINT E BASEMENT: 591 S . Ft. DOES NOT COUNT � � > q � > �an J�os�e� G� q 5 1 1 8 � � (E) FIRST FLOOR&ATTACHED GARAGE: 1,54s sq. Fc. (4 O S) 6 6 6-8 5 4 4 � A4.1 CROSS SECTION SHEET LOCATION (E) SECOND FLOOR: 644 Sq. Ft. �- (E)THIRD FLOOR: 306 Sq. Ft. � � EXTERIOR ELEVATION + (N)ADDITION: 130 Sq. Ft. Q � ( � I O � / � � O A3.1 EXISTING TOTAL: 2,496 Sq. Ft. ;` �.�-"""��� � � � � � 00.00' SPOT ELEVATION PROPOSED TOTAL: 2,626 SQ. FT. � f � BUILDING LOT COVERAGE: �, ' f� � Fy� �>�I�. U � O � O O � � I � � � � � � � � � � 1❑ DRAWING KEYNOTE �,,� ' ��,, PROPOSED HOUSE FOOTPRINT: 1,676 Sq. Ft. .+/ ; � � � t� ,,, j� HRISTOPHER � � (E) SHEDS: 95 Sq. Ft. 2 ��`� EDWARD CLAYTON o � MATCH LINE OVERHANGS/ EAVES/PATIOS: 1,215 Sq. Ft. C-32740 `" � � � � � I � O � � � � O � � PROPOSED TOTAL LOT COVERAGE: 2,986 Sq. Ft. �c * � U � 2� DRAWING REVISION Q" PROPOSED FAR: 2626/4725=0.56 N� 1 1/30/20 1 7 ` j RENEWAL � � ALLOWABLE FAR: 45% = 0.45*4725 = 2126.25 9�' DATE Q� � ��F CAL�FO z c� � w ❑ z GENERAL NOTES ABBREVIATIONS DIRECTORY GREEN BUILDING NOTES 0 Q A�PN: 326-03-048 U � COORDINATION ENERGY A.F.F. ABOVE FINISHED FLOOR J.H. JOIST HANGER OWNER: MR PETER CHAN & MS TET LIEW LANDSCAPE/SITE � AB ANCHOR BOLT JB JUNCTION BOX 10800 PENINSULARAVENUE � 1. IF THESE DRAWINGS ARE NOT 24"x 36"THEY HAVE BEEN REDUCED OR ENLARGED 20. THIS BUILDING MEETS THE ENERGY BUILDING DESIGN REQUIREMENTS OF TITLE 24 PART 6. ABV. ABOVE JST. JOIST CUPERTINO, CA 95014 1. DIVERT 50% (BY WEIGHT) OF ALL CONSTRUCTION AND i�ROJ�GT LOG�TIOI�I: o SEE SHEET# FOR CERTIFICATE OF COMPLIANCE. AC AIR CONDITIONING JT JOINT TEL: #Client Phone Number DEMOLITION WASTE (RECYCLING OR WASTE) (CALGREEN CODE) 0 2. THE STANDARD A.I.A. GENERAL CONDITIONS ARE HEREBY MADE A PART OF THESE DRAWINGS ADJ. ADJUSTABLE K.D. KILD DRIED EMAIL: #Client E-mail o � 2.TURF SHALL NOT BE INSTALLED ON SLOPES EXCEEDING 10/o 21.ALL WINDOWS AND DOORS SHALL BE DOUBLE GLAZED U.O.N. ALUM. ALUMINUM L.H. LEFT HAND 0 3.ALL WORK SHALL COMPLY WITH THE 2013 RESIDENTIAL CODE , 2013 CALIFORNIA MECHANICAL AND NO OVERHEAD SPRINKLERS INSTALLED IN AREAS LESS THAN � CODE, 2013 CALIFORNIA PLUMBING CODE, 2013 CALIFORNIA ELECTRICAL CODE, 2012 ASPH. ASPHALT LAV. LAVATORY ARCHITECT: CLAYTON DESIGN SERVICES 8'-0"WIDE 0 22. FOR PROJECTS IN CALIFORNIA: B.O. BOTTOM OF LT. LIGHT 1330 MONTMORENCY DRIVE m CALIFORNIA ENERGY CODE, 2013 CALIFORNIA GREEN BUILDING CODE AND 2013 CALIFORNIA � FIRE CODE B.U.R. BUILT-UP ROOFING MAX. MAXIMUM SAN JOSE, CALIFORNIA 95118 3.TURF IS A SMALL PERCENTAGE OF THE LANDSCAPE AREA(2 � A. INSULATION SHALL MEET THE CALIFORNIA ENERGY COMMISSION (C.E.C.)QUALITY gD BOARD MED. MEDIUM � ) o) co TEL: 408 666-8544 POINTS FOR<_25%, 4 POINTS FOR<_10°/ � STANDARDS AND BE CERTIFIED BY THE MANUFACTURER. � 4.ALL DIMENSIONS ARE TO FACE OF STUD OR FACE OF CONCRETE UNLESS OTHERWISE NOTED BLDG. BUILDING MFR. MANUFACTURER EMAIL: chris@claytondesigns.com � U B.ALL FREEZERS, REFRIGERATORS,AND FLUORESCENT LAMP BALLASTS SHALL BE BLKG. BLOCKING MIN. MINIMUM 4. IRRIGATION SYSTEM SHALL HAVE SMART(WEATHER BASED) � � 5. DO NOT SCALE DRAWINGS FOR DIMENSIONS. WRITTEN DIMENSIONS SHALL TAKE OWNER TO SELECT CONTROLLER (CALGREEN CODE) � i CERTIFIED BY THE C.E.C. BLW. BELOW MIR. MIRROR GENERAL CONTRACTOR: � PRECEDENCE OVER SCALED DIMENSIONS BM. BEAM MTD. MOUNTED XXX � � � � C.ALL HVAC EQUIPMENT, WATER HEATERS, FAUCETS,AND SHOWER HEADS SHALL BE BRZ. BRONZE MTL. METAL WATER EFFICIENT FIXTURES 6. DISCREPANCIES BETWEEN THESE DRAWINGS AND ACTUAL SITE CONDITIONS SHALL BE XXX � ` O CERTIFIED BY THE C.E.C. BTW. BETWEEN (N) NEW XXX /" BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO COMMENCEMENT OF ANY WORK 1. HIGH EFFICIENCY SHOWERHEADS <_2.0 GALLONS PER MIN. � C.I. CAST IRON N.T.S. NOT TO SCALE XXX (GPM)AT 80 PSI. (MULTIPLE SHOWERHEADS SHALL NOT EXCEED Q � Q 23.ALL TOILETS ARE TO BE ULTRA LOW FLOW 1.28 GALLONS MAXIMUM FLUSH CAPACITY PER W O �„n a 7. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS AND OR SAMPLE BOARDS TO ARCHITECT C.I.P. CAST IN PIPE NIC NOT IN CONTRACT XXX MAXIMUM FLOW RATES) (CALGREEN) CPC 402.2.2 � � J PRIOR TO ORDERING AND OR INSTALLATION FOR C.O. CLEAN OUT O/ OVER STRUCTURAL ENGINEER: � -ALL MILLWORK(CUSTOM OR FACTORY PRODUCED)WITH COUNTER MATERIAL CAB. CABINET OC ON CENTER XXX 2. USE HIGH EFFICIENCY BATHROOM FAUCETS <_ 1.5 GPM AT 60 PSI � 24. THERMOSTATS SHALL BE OF A PROGRAMMABLE DUAL SET BACK TYPE. � -ALL EXTERIOR WINDOWS/DOORS WITH FIN. SAMPLES CL CENTER LINE OPG. OPENING XXX (CALGREEN) -ALL INTERIOR DOORS WITH FIN. SAMPLES 25. WATER HEATER SHALL BE INSULATED WITH R-12 BLANKETAND PIPES WITHIN FIRST FIVE CLG. CEILING P.T. PRESSURE TREATED XXX - � � -WOOD SIDING (CONNECTION AND CORNERS)WITH FIN. SAMPLES XXX 3. USE HIGH EFFICIENCY KITCHE AND UTILITY FAUCETS <_ 1.8 GPM � FEET OF TANK WITH R-4 CLO. CLOSET PL. PLATE -ALL TILE WORK 12"X12" MOCKUP (INTERIOR AND EXTERIOR) (CALGREEN) (y � � -EXTERIOR STUCCO 24"X24" MOCKUP CLR. CLEAR PLAM. PLASTIC LAMINATE �� -EXPOSED FLASHING ELEMENTS (SAMPLE) 26. GENERAL LIGHTING IN KITCHENS AND BATHS SHALL BE HIGH EFFICACY& COMPLY w/TITLE 24 CMU CONCRETE MASONRY UNIT PLYWD.PLYWOOD LANDSCAPE ARCHITECT: XXX 4. INSTALL ONLY HIGH EFFICIENCY TOILETS (DUAL-FLUSH OR<_ 1.28 � � CALCULATIONS -EXPOSED ROOFING (SAMPLE) COL. COLUMN PNL. PANEL XXX GALLENS PER FLUSH (GPF) (CALGREEN) � � 0 CONC. CONCRETE PR. PAIR XXX CONTRACTOR DUTIES LIFE SAFETY CONT. CONTINUOUS PTD. PAINTED XXX HVAC � � Z � CSK. COUNTERSINK R RISER XXX 7. THE CONTRACTOR SHALL: CSMT. CASEMENT R.H. RIGHT HAND 1. INSTALL ENERGY STAR BATHROOM FANS ON TIMER OR O � � 27. WHERE REQUIRED BY LOCAL JURISDICTIONS, BUILDINGS TO BE FULLY SPRINKLERED IN CLAYTON DESIGN SERVICES HUMIDISTAT CALGREEN A. FURNISH, PAY FOR,AND FILE ALL NECESSARY PERMITS, FEES, INSPECTIONS, ETC. ACCORDANCE w/2013 CRC SEC. R-313/R-309.6 AND 2010 NFPA. DRAWINGS TO BE SUBMITTED CTR. CENTER R.O. ROUGH OPENING LIGHTING DESIGNER: � � (�/ FOR PERMIT BY DESIGN/BUILD SUBCONTRACTOR CW COLD WATER R.W.L. RAIN WATER LEADER 1330 MONTMORENCY DRIVE _ � � !L EXCEPT FOR PLAN CHECK, ZONING,AND SCHOOL FEES WHICH WILL BE PAID FOR BY SAN JOSE, CALIFORNIA 95118 2. INSTALL WHOLE HOUSE FAN (CALGREEN) THE OWNER DF DOUGLAS FIR RAD. /R. RADIUS (� O � 28. SMOKE DETECTORS SHALL BE HARD-WIRED IN CEILINGS AND EQUIPPED w/A BATTERY DH DOUBLE HUNG REINF. REINFORCED TEL: (408)666-8544 3. COMPLIANCE W/ASHREA 62.2 MECHANICAL VENTILLATION � I-� � B. GUARANTEE ALL WORK FOR ONE YEAR AS EVIDENCED BY THE DATE OF THE FINAL BACKUP. SEE REFLECTED CEILING AND MECHANICAL PLANS FOR EXACT LOCATIONS --2013 CRC DIA. DIAMETER REQ'D REQUIRED EMAIL: chris@claytondesigns.com STANDARDS (AS ADOPTED IN TITLE 24 PART 6) CERTIFICATE OF PAYMENT SEC.314 DIM. DIMENSION RESIL. RESILIENT � O � 29.ALL SMOKE DETECTORS TO BE WIRED FOR 24 HOUR MONITORING BY REMOTE ANSWERING DISP. GARBAGE DISPOSAL RM. ROOM CIVIL ENGINEER: XXX FINISHES = ,� (� � 1 C. PROVIDE RELEASE OF ALL SUBCONTRACTOR AND SUPPLIER LIENS BEFORE FINAL DN. DOWN RWD. REDWOOD XXX � O t� STATION PER NFPA 72 PAYMENT IS MADE DR. DOOR S.A.D. SEE ARCHITECTURAL XXX 1. USE LOW-VOC. CAULKS, CONSTRUCTION ADHESIVES AND DTL DETAIL DRAWINGS XXX SEALANTS THAT MEET SCAQMD RULE 1168 (CALGREEN) D. FILE WORKMAN'S COMPENSATION XXX � MEP DW DISHWASHER S.C. SOLID CORE 2. REDUCE FORMALDEHYDE IN INTERIOR FINISH - MEET E.ARRANGE FOR ALL INSPECTIONS AS CALLED FOR IN SECTION 108.4 OF THE 2007 CABC DWG. DRAWING S.C.D. SEE CIVIL DRAWINGS XXX CURRENT(ATCM) FOR COMPOSITE WOOD (CALGREEN) 30.ALL GAS APPLIANCES SHALL HAVE GAS IGNITER TYPE PILOTS AND INTERMITTENT IGNITION DWR. DRAWER S.L.D. SEE LANDSCAPE DEVICES XXXX 8. CONTRACTOR SHALL INSTALL ALL MATERIALS AND EQUIPMENT IN ACCORDANCE WITH (E) EXISTING DRAWINGS GEOTECHNICAL ENGINEER: 3.ALL CARPET AND 50% OF RESILIANT FLOORING IS LOW MANUFACTURER'S RECOMMENDATIONS AND ALLAPPLICABLE CODES EA. EACH S.P. SOLID PIPE XXX EMITTING (CALGREEN) 31. CLOTHES DRYERS SHALL BE VENTED TO THE OUTSIDE. PROVIDE BACKDRAFT DAMPER EL. ELEVATION S.S. STAINLESS STEEL 9. CONTRACTOR SHALL PROTECT EXISTING VEGETATION AND ADJACENT SITE IMPROVEMENTS 32. WATER HEATERS SHALL BE SECURELY FASTENED TO PREVENT OVERTURNING AS DETAILED ELEV. ELEVATOR(OR ELEVATION) S.S.D. SEE STRUCTURAL XXX GENERAL FROM DAMAGE DURING THE COURSE OF THE WORK ON DRAWING 2/A8.1 --2013 CRC R301.2.2.3.7 EQ EQUAL DRAWINGS EXP. EXPOSED S.T. STEEL TROWEL 1. CONTRACTOR SHALL DEVELOP A MANUAL OF GREEN 10. CONTRACTOR SHALL BRACE STRUCTUREAS REQUIRED DURING CONSTRUCTION 33.ALL HOT WATER FAUCETS WITH 10 FEET OR MORE OF PIPE BETWEEN FAUCETAND WATER EXT. EXTERIOR SH. SHELF FEATURES/BENEFITS (CALGREEN) Revisions: 11. CONTRACTOR SHALL PROVIDE STRICT CONTROL OF JOB CLEANUP TO REMOVE DUSTAND HEATERARE TO BE EQUIPPED WITH HOT WATER RECIRCULATING SYSTEM F.G. FINISHED GRADE/FIXED GLASS SHR. SHOWER DEBRIS FROM CONSTRUCTION AREA F.O.C. FACE OF CONCRETE SIM. SIMILAR VI C I N ITY MAP S P EC IAL N OTES 34.ALL SHOWERS AND TUB-SHOWER COMBINATIONS SHALL BE PROVIDED WITH INDIVIDUAL F.O.F. FACE OF FINISH SPK. SPEAKER PRELIMINARY PLANNING GOMMEhlTS 12.ALL SPECIAL INSPECTION AGENCIES, INDIVIDUALS,AND SHOP FABRICATORS SHALL BE CONTROL VALVES OF THE PRESSURE BALANCE OR THE THERMOSTATIC MIXING VALVE TYPE F.O.S. FACE OF STUD STL. STEEL �5/1/20 1 � APPROVED BY THE BUILDING DEPARTMENT PRIOR TO ANY WORK BEING PERFORMED. FD FLOOR DRAIN STN. STAIN - CONTRACTOR SHALL SUBMITALL DOCUMENTATION FOR APPROVAL 35.ALL HOSE BIBBS SHALL HAVE APPROVED NON-REMOVABLE BACKFLOW PREVENTION FDN. FOUNDATION T&G TONGUE & GROOVE _ -Verizon Store+._. � DEVICES --2013 CRC AP103.3 " 13. CONTRACTOR SHALL PROVIDE PLANS OF GAS LINE SIZING TO THE BUILDING INSPECTION FIN. FINISH T. TREAD '`` " ;_��,, . ,, : :_,, OFFICE PRIOR TO CALLING FOR INSPECTION 36. DUCTS SHALL BE CONSTRUCTED, INSTALLED AND INSULATED PER 2013 CMC FLR. FLOOR T.O. TOP OF :� Chain Reaction Bicy�c�les FRPR. FIREPROOFING T.O.C. TOP OF CONCRETE - O �+ GENERAL 37. EXHAUST SYSTEMS SHALL HAVE DAMPER CONTROLS FTG. FOOTING T.O.P. TOP OF PLATE ._ CCLC Preschool G.I. GALVANIZED IRON T.O.S. TOP OF STEEL/SLAB �= in Los Altos 14.ALL STAIRS WITH MORE THAN THREE RISERS SHALL HAVE ONE (1) 1-1/4"-2" DIAMETER 38.ALL ELECTRICAL OUTLETS IN EXTERNAL WALLS SHALL HAVE INSULATING GASKETS G.W.B. GYPSUM WALLBOARD T.O.W. TOP OF WALL � -- HANDRAIL w/ 1-1/2" CLEARANCE FROM THE WALL.ALL RAILS SHALL BE BETWEEN 34"AND 38" GA. GAUGE T.P.H. TOILET PAPER HOLDER Springwood Apartments __ ABOVE NOSING OF THE TREAD AND BE CONTINUOUS FROM THE TOP RISER TO THE BOTTOM 39. NO LIGHT FIXTURES IN CLOTHES CLOSETS SHALL BE CLOSER THAN 12"TO COMBUSTIBLE GL. GLASS T.S. TUBE STEEL RISER--####CRC SEC.311 STORAGE ITEMS--2013 CRC H.C. HOLLOW CORE THK. THICKNESS " H.W. HOT WATER TYP. TYPICAL t'�� 15. GUARDRAILS SHALL BE A MINIMUM OF 42" IN HEIGHTAND DESIGNED SUCH THATA4" SPHERE 40.ALL 120V/ 1-PH / 15-&20-AMP BRANCH CIRCUITS IN BEDROOMS SHALL BE PROTECTED BYA , �� CANNOT PASS THROUGH ANY OPENING --####CRC SEC.311 LISTED ARGFAULT CIRCUIT INTERRUPTER--2013 CEC ARTICLE 210.12 HB HOSEBIB U.O.N. UNLESS OTHERWISE ��. HDR. HEADER NOTED � � 16. FIREBLOCKING AND DRAFTSTOPPING SHALL BE PROVIDED IN ALL LOCATIONS IN 41. HYRO RADIANT, CONTRACTOR SHALL DOCUMENT AND PROVIDE DIMENSIONED DRAWING/ HOR. HORIZONTAL V.I.F. VERIFY IN FIELD � ° � � ACCORDANCE w/####CRC SEC.302 WITH PICTURES OR VIDEO FOR THE OWNER SHOWING LOCATIONS OF ALL IN FLOOR HYRO- HT HEIGHT V.T.R. VENT THROUGH ROOF People Greete � W RADIANT TUBING. HTR. HEATER VP VENT PIPE o � � �1Ufti el' 0 Penin5ular W � = 17. HEARTHS SHALL EXTEND 20" IN FRONT AND 12" BEYOND EACH SIDE OF FIREPLACE OPENING FRAMING PLANS AND LIGHTING COORDINATION I.D. INSIDE DIAMETER W.O. WHERE OCCURS � � °5erra Fv�,y SITE _ � � I.D. INSIDE DIAMETER W.P. WATERPROOFING � `� � � 18. FIREPLACE SHALL HAVE TIGHT FITTING METAL OR GLASS DOOR AND OUTSIDE AIR INTAKE INS. INSULATION W.S. WEATHER STRIPPING 1. CONTRACTOR SHALL REVEIW ALL RCP/LIGHTING PLANS PRIOR TO SETTING FLOOR/ROOF INT. INTERIOR W/ WITH m � W WITH DAMPERAND CONTROL JOIST MEMBERS TOALLOW FOR LIGHTING PLACEMENTAS SHOWN, CONTRACTOR SHALL � _,,. Print Date: 8/8/ 1 � � = WC WATER CLOSET z a ~ 19.ALL GLAZING SUBJECT TO HUMAN IMPACT SHALL BE TEMPERED--####CRC SECTIONS SPOT LOCATE (PAINT OR OTHER MEANS)ALL RECESSED FIXTURES AND NOTIFY THE ARCHITECT WD. WOOD � s QW o R.308/R.327.8 FORA WALK THRU PRIOR TO SETTING OF CANS IN PERMANENT LOCATION. WDW. WINDOW J4n�pe�o PROJEGT #: 20 1 6 1 � Z m o ARCHITECT SHALL HAVE ACCESS TO THE SITE AT ALL TIMES WH WATER HEATER GS Serr a Fwy - � � � ou, ccZ - � � > � � c,e,t�n �, DR�YVN Y: G G w Q w - �;�:, . x � a > � � D�T�: q/2016 w � Z w Zw � _- Q � � Z _ � � w � � �y � GO��iZSH��T Ain Ainsw r `;;� zF � w ' ¢j Q U = z ,� SL�JOfrtll D� O [/j�, � � � o , � a ~ ~ N /� � } w = o Q � � � SHE�T #: /`�O . O w ~ F U _ � - , � O � O , � , � ., _. � ;-)i-"-i;.�i� � � aa � � • � � �U `° - a � � � �� �� � w � r'� 1�rl'1 � � z Gommunity e�el; ' , ��n� _ ;� , w . �� � �� , � � � Pla�ni Di ���r� � � � � w � � � � z ; � Z A P '� ��I,��D� o a � �u��RTiNo � i � . U \� � . ,i o � �a S� # - - ��— —% � � T } � Q 75'-O" Ap 1�C�tio�1 Numher�5} � � GL�YTO1� D�51G Qo .° � � ' Appro�a l Bo dy: Di r ctor I��YI G�5 U � / } � A ro�ra I Date 08/ 8/�ristopher Glayton, � pp . °° � r�i �..i i i��.,�..�, �,.._,.._,.. r.i W �` S! nature Beth Ebl en G� Lic. # G-32 '740 I a g � �5� aE�oe� morency riv J 5an Jo�e, G� q 5 1 1 8 Q j (408) 666-8544 � � m 20'-O"FIRST STORY % � � Q REAR SETBAGK � % � f�' f,,,,.,,.-----. . � — — — — — 2�REAR S�TBA�G ORY — — — — / �� ' j t � Fy� �.,> i . � - ��j:/,. � � — — � i �-:-��� • � / / �� + �HRISTOPHER j� � � ����������, ���������/ � �� � N HATGHED AREA DENOTES � �� EDWARD CLAYTON � LAND UNDER SGVWD ERSEMENT � � C-32740 � W U � �E) 6'-O"HIGH WD�ENGE N�9 1 1/EO�O 1 7 �`Q- �' DATE Q� � Q F�F CA`�FO z — — — — — .— . — .— .— . — .— .— .— . — .— .— .— c� � (E)PLASTIG NO : �E� DETRGHED WOODEN sH�D � SHED TO BE REMOVED � 3 1 5G{�t WOODnEN j o P,�v�Rs 64 sa�t i BY OWNER � 2a6 sa Ft Q �PN: 32C�-O�-048 J U <n EDGE OF SGVWD EASEMENT � — — — — — — — — — — — a� � PROJEGT LOG�TION: � U O 0 ua GRO55-H,4TGHED u� oz � � ARER DEh10TE5 _ � z c� w � } p USABLE SITE AREA: � p w o Q o � � � v 4�255Gi.Ft � � v � � m - � co � � QQ � Qd � �i z N dld z [A ,;x � zm � 4 z 0 - � m � N � J1 � � � � � � � 0 � � � c� � � � w U N P,4VER5 v a1 � � = O � � o � o ,� W NQ 1295c{Ft UW1Q � � o � U � � � oQ oN o � � Q � I■`� � �t � � o � � � ° � � �u ? � � � OUTLINE O�ROOF � � � � � � — � — � _ �BOVE- - - - � - - >` O a � — � Q _ � � � �� 0 W LL � � � � � C � � � � � � � � � � Q p UP � (E)51NGLE I TWO-GAR GARAnGE \ �+• W ' � � I �AMILY RE5IDENGE I � O I � � Z — Z � � � Z � � � �� � � � n, I I I !� , Q Q o u� UP _ _ _ _ 20'-O"SEGOhID STORY _ _ _ _ _ � I � Q O LI— I FRONT SETB?�GK � � RREA OP � � � � � � � ,4DDITION � SHOWN HRTGHED: •; •`<y`;; ``; •� �� �x � O I 1 30 5G{Ft �EJ�OTRERED r � 80 Sq,Ft � � � _1 O'-O"FIRST STORY (E) 6'-O"HIGH WD FENGE � _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ � FRONT SETBAGK x (E) 1 6'-O"WIDE �� GOh1GRETE DRIVEWAY � Revisions: � � : � ������ PRELIMINARY PLANNING GOMMEIVTS �51-�It 1 5/1/20 1 � PRELIMINRRY PLANNING GOMMENTS 2 �/2 1/201 � GEh1TERLINE PENIIJSULAR AVENUE Y o _ _ _ _ _ _ _ _ _ _ _ _ (20'-O"RIGHT OF WAY TH15 SEGTION) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ � w o � � � U � w � O ~ w = _ � U � w � J a ¢ i�rint Date: 8/q/ 1 '7 m U W _ - _ a -' � z a � � � 0 0 � � ° � CHAN SITE PLAN PROJ�GT #: 20 1 6 1 o Z � U A1.0 SCALE: 1/8" = 1'-0" Diz�YVN BY: GEG w a W - _ � a � � � � Z W D� . q/201 h wZw � a � � Z � W � � �fiZGHIT�GTUfi��L Z � '� W � = w o a � � Z 51T� �'L�l�l � � o oa � � > > w = a a (n = J w ~ ~ � A � o � o SH #: g o aa� o • N � � T � � � O �� � � • �—� � . � w �, ���� � rt rrl t Gommunity e�el, �� � � n � , N U ' � � � M w , ;� ��_ � /� , z � � Pla�ni Di ���r� � � � o � � � w � � AP '����D� -\ ; z Q �UPERTlNO � � � a v ✓�� � . * Ca Se # - - �-- -=' � o � � Q A� 1�C�tio�� Numher�s} � GL�YTO1� D�51G U � a� O o � Appro�a l Bo dy: Di r ctor I��YI G�5 _ � risto her Gla ton, � � Appro�ra I Date 08/ 8/�'�' p y ma n� �..� ����.,�..�, �,.._,.._,.. T.� W �` 51 nature Beth Eb l�en G� Lic. # G-32 '740 I Q g on morency riv � 5an J�o�e, G� q 5 1 1 8 � (408) 666-8544 � Q '� 1 m A3.0 N Q C (B U � 590.95 sq ft � � U � � 0 N w 484.74 sq ft U � w � Z U � w 0 Z I I I I BAcSEMENT I GONGRETE BLOGK � I I I I LP�NDING ✓`�RLL TO 8'-q"a�Bv s�a,B J _ _ i � iji � � � � I 3`°„ - - - - - - - -� ' �PN: 32C�-O�-048 0 0� � I I � o �'-$" � LIN�OF SOFFIT �� U � � 6�_8„ � � � I I I I � w 6,_8„ 8RT �112 � � — — � � � � � � ( � � UP � � � � E�o3 �- � i i i i � � PROJEGT LOG�TION: � ; � ili ili � � � i / o � 0 3-0 � i i i i � % � i � � � s�-s° � I REC ROOM I � a � % � % N j j I I I 001 I � I w o j � I I I I STORAGE Q � m I // I I I I I I � . � jj//�//r I / I � � �w � j I I j I I % �F� � o � j I I I j I I � � ��I / GARAGE � � � j I I I I j = Z � � � % � , � � , � � � o 0 o W � � H O M E O F F I C E � I j I I I I � � GONG SLRB ON GRADE `�' � ? 0�2 lL � j I I I I � I % i i 1 3'GLG / � � 4 / // / /������������/ / j � � A3.0 � O I II I II II I II � � � Q O d j O � IO � � W � �, , � W � J � W � � i 2 � � z I \ � � � I A3.0 � � � � I � � \ \ � \ / / i / / 7 � — � � � /j�, � � j���/ / x \ ����j � � � � V � j � � j � \ � � � , , W � 0 � — � � , , – �ill -10"' – – –gi '-T6" – � � � � � I � / E102 \ � I 0 — I — - - — — — - I I� ' \ J � � � � I I lo � I o � I I GR�WLSP?�GE _ n n/ I L — JV N I V N I I I I � � �� � I I O � US � US I I � � `"' � � � _ _ _ � � J i � O � � � � � � ,� - u � � I I NEW W � i � J O I � GRP�WLSPI�GE � I I � � / � � I I I I i � I I I I � � I I I I � � i i I � I � — — — — — — — — — — — � i i I L - - - - - - - - - - - - - � Revisions: � � 1 A3.0 Y 0 a. W � � W � (E) FDN / BASEMENT PLAN � � ~ a2.o = o � SCALE: 1/4" = 1'-0" �, W � Ja ¢ i�rint Date: 3/2 '7/ 1 '7 m U W _ - _ a -' � z a � � � 0 0 z m o PROJ�GT #: 20 1 l� 1 � � � _ o � o ; � � Diz�YVN BY: GEG waW - _ � a � � � � Z W D� . q/201 h wZw � a � � Z �X15TI1�G �D1� / � U � C� w � u� Z � � W ��5�1��1�1T � = w o Q U = Z � � � O ���1 ' ❑ a ~ ~ 7 } W = Q a (n = J w ~ ~ � A � o � o SH #: � � aa� o • N � � T � � � O �� � � • �—� � . � w �, ���� � rt rrl t Gommunity e�el, �� � � n � , N U ' � � � M w , ;� ��_ � /� , z � � Pla�ni Di ���r� � � � o � � � w � � AP '����D� -\ ; z Q �UPERTlNO � � � a v ✓�� � . * Ca Se # - - �-- —=' � o � � Q A� 1�C�tio�� Numher�s} � GL�YTO1� D�51G U � a� O o � Appro�a l Bo dy: Di r ctor I��YI G�5 _ � risto her Gla ton, � � Appro�ra I Date 08/ 8/�'�' p y ma n� �..� ����.,�..�, �,.._,.._,.. T.� W �` 51 nature Beth Eb l�en G� Lic. # G-32 '740 I Q g on morency riv � 5an J�o�e, G� q 5 1 1 8 � (408) 666-8544 � Q � � m A3.0 � Q c ca � U � 1 � A4.1 � 59'-7" � 37'-0 7/8" 22'-6 1/8" o I N � I U � US > � W � o 0 Z `•' v Ur E104 � E104 � � Sill '-8" W p o ao 0 0? ir� ifl io io Z �' � FIRS FLOOR o � � s�-o° o LP�NDING ���: � 2 �—��—�q'8 U 6 $ W SR C 6 1/2" � � 7TC 1 1" � - ❑ �Q PROJEGT LOG�TION: � 6'-6" °° U � o � 3�-0�� � ❑ KITCHEN FAMILY ROOM 0 103 104 N 0 8'GLG 8'GLG 0 m „ ; U ,1 , (B - � °O - - G,4R,4GE BELOW / �� 0 o N � - v BEDROOMS A�BOVE � � Z � � � ? N E103 SR @ 6 1/2" D� N � u„` � 8'GLG �TC 1 1" 8RC 7 1/2" � � O 4 �T C 1 2" � � � A3.0 � a � � O W _ LINE OF 50FFIT N �° _ W � � J - � � — —� — — — — — — — — — — — � � M � ,��8 W� �p� E103 \ � � � � M � M -nw STUDY �� � M � n/ � � 102 �� � � HDWD FLR � l� � � � o� 1/2 BATH W \ � O �'-o" i� 105 � � � � Sill '-8" Sill '-8" Sill '-8" T.P Q' Q z - � LIVING ROOM �� ENTRY — � � 0 0 0 0 0 0 101 �� 100 � � � `� � � � `� � HDWI�FLR �I 9'GLG � tt ' UP Q I HDWD�LR o 2'-6„ � � Q O L�L{ D US US US 1 OR cs� 6 1/2" w w 6�-8�� M � (� O (1 u a�- 9TC 1 1" � � � � � � � � � u � � � c� 0 5 v � w 6 Q O T � � E103 � � � r � � N � � M 8'-6" - T.P � � � � � � o � o Revisions: CV � (V if) US U.S 11'-3 7/8" 12'-7 1/8" 3'-11 1/8" 1'-10" 9'-0" 1'-10" � 40'-6 1/8" 19'-0 7/8" I 1 � A4.1 1 � EXISTING FIRST FLOOR PLAN A2.1 SCALE: 1/4" = 1'-0" Y 0 a. W O � � � U � w � O ~ w = _ � U � w � Ja ¢ i�rint Date: 3/2 '7/ 1 '7 m U W _ — _ a -' � z a � � � 0 0 z m o PROJ�GT #: 20 1 l� 1 � � � _ o � o ; � � Diz�YVN BY: GEG waW - _ � a � � � � Z W D� . q/2016 wZw � ¢ a � Z � U � � z � � W �XISTI�IG �1�5T � = w o � � � o �LOOR �L�1� oa � � > > w = a a (n = J w ~ ~ � A � o � o SH #: � N aa� o • N � � T � � � O �� � � • �—� � . � w �, ���� � rt rrl t Gommunity e�el, �� � � n � , N U ' � � � M w , ;� ��_ � /� , z � � Pla�ni Di ���r� � � � o � � � w � � AP '����D� -\ ; z Q �UPERTlNO � � � a v ✓�� � . * Ca Se # - - �-- —=' � o � � Q A� 1�C�tio�� Numher�s} � GL�YTO1� D�51G U � a� O o � Appro�a l Bo dy: Di r ctor I��YI G�5 _ � risto her Gla ton, � � Appro�ra I Date 08/ 8/�'�' p y ma n� �..� ����.,�..�, �,.._,.._,.. T.� W �` 51 nature Beth Eb l�en G� Lic. # G-32 '740 I Q g on morency riv � 5an J�o�e, G� q 5 1 1 8 � (408) 666-8544 � 1 Q .� m N Q C � 643.45 sq ft � � � U � � � US US US N � w I I C� - - - - - - 0 0 0 0 0 0 � I I N M N M N M uwi I I s�ii �-s° s�ii �-a° s�ii �-s„ z � — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — � � FIRST FLOOR � � � � L,�NDING ° � � I I o � aR @ 6 �ia" W�LK-IN �I / Q Q � "iTC 11" � � ��I`4: � 2C�—Q�—�4G.J � � I D� MASTER BATH � I—� I � � i 2°2 6;-8„ W i i i � PROJEGT LOG�TION: � � THIRD FLOOR I I O I �tB��E o � I E103 � � L � � v � � O E105 `� CO N ,, O � � � ° � � ///%/%%/%%/%//%//%/%//%//�� • � � � , i LU � I UP DN � � � � I aR @ 6 �i2° aR @ 6 �i2° j MASTER BEDROOM / � Z '� 20� � � � � ` l T Q 1 1" l T@ 1 1" 3'-0" o �/�%// / � � � A3.0 I SEGOND FLOOR 6�-8�� w 1 1'-6"c�g I _ _ ~ I N � LA�NDING _ _ _ _ LINE OF SOFFIT _ _ _ _ _ O Q � � a I � W E103 _ O � � i , � � � ,,,/ W � (�/ � � , ;= � � � � � 0 � � � � � � I I � /� � o �-o�� � Q � � � j w 6._$„ o � � � � � j BEDROOM 1 % � � � �� W � � . � � 8°° � - - - - - - - - - - - Z � � � � � � Hdwd Flr � 8'-O"TOP PLATE � � � � � � Sill '-8" Sill '-8" � i i � � �1 ~ � /iiiii�iiiiii� (V � � � � � � % - - - — � � /% / o0 00 , , � , � � � � � Q Q o � , � Si�� �_2�� n � US US � � s� � � � � � � � u � � � , � o � o , � , � � � � , � � � � � � � � � � , �S , � -� � -� i , i i i i L - - - - - - - - - - - - -� �_ � �_ � i � Revisions: i i i Dr I � Layl I Dr I Layl 1 A3.0 � EXISTING SECOND FLOOR PLAN A2'2 SCALE: 1/4" = 1'-0" Y 0 a. W O � � � U � w � O ~ w = _ � U � w � Ja ¢ i�rint Date: 3/2 '7/ 1 '7 m U W _ - _ a -' � z a � � � 0 0 z m o PROJ�GT #: 20 1 l� 1 � � � _ o � o ; � � Diz�YVN BY: GEG waW - _ � a � � � � Z W D� . q/201 h wZw � a a ~ Z �X15TI1�G � � � � U � - C� w u� Z ~ � W S�GON�D � = w o Q U � Z � � O ��OO� ��� 1 ' ❑ a ~ ~ 7 } W = Q a (n = J w ~ ~ � A � o � o SH #: � M o a NOTES - FLOOR PLAN: N � � T � --- ______ �U o -- ALL GRIDLINES ARE TO FACE OF STUD, U.O.N. i�/ � � ' �, � v -- ALL DIMENSIONS TO ��� �Tl.��.���U n It� eV�'I; ; (� n ( ���� �m � M z SEE DIMENSION SY 1 L� �OVER SHEET w . ,-� �-� � �� , o � P I a�n i D i ����r� � �r� � w � � AP '����D� -\ ; z Q �UPERTlNO � � � a v ✓�� � . * Ca Se # - - �-- —=' � o � � Q A� 1�C�tio�� Numher�s} � GL�YTO1� D�51G U � a� O o � Appro�a l Bo dy: Di r ctor I��YI G�5 _ � risto her Gla ton, � � Appro�ra I Date 08/ 8/�'�' p y ma n� �..� ����.,�..�, �,.._,.._,.. T.� W �` 51 nature Beth Eb l�en G� Lic. # G-32 '740 I Q g on morency riv � 5an J�o�e, G� q 5 1 1 8 � (408) 666-8544 � �� 305.83 sq ft A3.0 .� m � a � � � � 15'-0 3/8" 22'-5 3/4" 21'-11 1/2" � � 14'-4 1/2" 8'-1 1/4" � 6'-1 1/2" 4'-4 3/4" 3'-10 1/4" � N US � W � o 0 ° � ih v W " � � Sill '-8" z � — — — — — — — — — -r 2'-p" — — — — — — — — — — — — — — — — — — — — — — — � O � ' � � `� 2 � � o z�-a°BAT o z�-a° THIRD FLOOR I � � w 6,_$„ 3 O w 6._$„ Z � LP�NDING � � r/ SR c�? 6 1/2" g6"Hlgh 1� 1�� / �1 GL Q I '1Tc 11' 1/2Wall � l'l�l`4: � 2C�—Q�—�`TGJ 2'-0" DN I t�n I o 0 2-6" � � M 26 `� w s�-$�� i PROJEGT LOG�TION: � � � i o i M i o � � � i � � BEDROOM 3 � —� o°oo � � 301 \I I � I . `� I � � I � 8'GLG �, � � I M �+DWD FLR � -� � W 6�-$�� � U � � /I SR D6 1/2" I � � `� � �TC 11" � � � a`> 4 � � � A3.0 I SEGOND FLOOR � u I.0 ` = I L,4NDING � � Q � Q a i 0 � �1 d � (E)FLUE ill '-8" � I GHASE _ _ � � � � � o Q � I �II '-8" � N I I � � . I I � '� � ° ° 301-3 � I � '�` I " "' 2'-4 3/4' � � � � V � 5'-10 1/4" I � \ � � 301-2 I 0 L - - - - - - - - - - - '- " 8'-10" 7'-83/4" � � ' � ZZ Z � 22'-5 3/4" I 0 Z — � - - - - - - - - - - - - - - - - - - - - � � � � � i i — (L (L� � � Q Q � lU � � Q Q- J � � � I � — — — — — — — — — — — 1 , - , u � � � , o , � � � � � , , � � � � _ _ _ _ _ _ _ _ _ _ _ _ _� , Revisions: 1 A3.0 � EXISTING THIRD FLOOR PLAN A2.3 SCALE: 1/4" = 1'-0" Y 0 a. W O � � � U � w � O ~ w = _ � U � w � Ja ¢ i�rint Date: 3/2 '7/ 1 '7 m U W _ - _ a -' � z a � � � 0 0 z m o PROJ�GT #: 20 1 l� 1 � � � _ o � o ; � � Diz�YVN BY: GEG waW - _ � a � � � � Z W D� . q/201 h wZw � ¢ a � Z � � � � �XISTII�G THI�l7 � W � Z � � W � = w o � � � o �LOOR �L�1� oa � � > > w = a a (n = J w ~ ~ � A � o � o SH #: � � aa0 N � � T � � � O �� � � • �—� � . � w �, ���� � rt rrl t Gommunity e�el, �� � � n � , N U ' � � � M w , ;� ��_ � /� , z � � Pla�ni Di ���r� � � � o � � � w � � AP '����D� -\ ; z Q �UPERTlNO � � � a v ✓�� � . * Ca Se # - - �-- —=' � o � � Q A� 1�C�tio�� Numher�s} � GL�YTO1� D�51G U � a� O o � Appro�a l Bo dy: Di r ctor I��YI G�5 _ � risto her Gla ton, � � Appro�ra I Date 08/ 8/�'�' p y ma n� �..� ����.,�..�, �,.._,.._,.. T.� W �` 51 nature Beth Eb l�en G� Lic. # G-32 '740 I Q g on morency riv � 5an J�o�e, G� q 5 1 1 8 � (408) 666-8544 � Q .� m � Q � � � U c cB � U � � 0 N � W U � w � Z U � w 0 z O Q i i i , i i �PN: 32C�-O�-048 J U � � PROJEGT LOG�TION: � � U o r � � 0 N Y O O m � � I I I I I I I I I � I � � � � � �� � z � � � , � v � �u � (a �` O _ � f � a � a l�J W O J GHIMNEY � � � � I I I I . ! - � '`�. x � � '`�. � � � � �- � � � � W � `� 0 � � zzz � z � _ � u� - � t� Q Qo � = Q o �- u � � � 0 � Revisions: � (E) UPPER ROOF PLAN (ROOF BRG.) A2.4 SCALE: 1/4" = 1'-0" Y 0 a. W O � � � U � w � O ~ w = _ � U � w � Ja ¢ i�rint Date: 3/2 '7/ 1 '7 m U W _ - _ a -' � z a � � � 0 0 z m o PROJ�GT #: 20 1 l� 1 � � � _ o � o ; � � Diz�YVN BY: GEG waW - _ � a � � � � Z W D� . q/201 h wZw � ¢ a � Z � � � � �XISTII�G �00� � W � Z � � W � = w o I Q U � Z �L�� � � O ❑ a ~ ~ � } w = O Q (n = J w ~ ~ � A � o � o SH #: � � aa� o • N � � T � � � O �� � � • �—� � . � w �, ���� � rt rrl t Gommunity e�el, �� � � n � , N U ' � � � M w , ;� ��_ � /� , z � � Pla�ni Di ���r� � � � o � � � w � � AP '����D� -\ ; z Q �UPERTlNO � � � a v ✓�� � . * Ca Se # - - �-- -=' � o � � Q A� 1�C�tio�� Numher�s} � GL�YTO1� D�51G U � a� O o � Appro�a l Bo dy: Di r ctor I��YI G�5 _ � risto her Gla ton, � � Appro�ra I Date 08/ 8/�'�' p y ma n� �..� ����.,�..�, �,.._,.._,.. T.� W �` 51 nature Beth Eb l�en G� Lic. # G-32 '740 I Q g on morency riv � 5an J�o�e, G� q 5 1 1 8 � (408) 666-8544 � Q '� 1 m A3.0 N Q C (B U � 590.95 sq ft � � U � � 0 N w 484.74 sq ft U � w � Z U � w 0 Z I I I I BAcSEMENT I GONGRETE BLOGK Wt�LL TO 8'-9"ABV SLAB � I I LP�NDING � ���: � 2 (j-Q�-�q,�j � � � I � I � I � I � � _Lir��oF soFFi-r_ _ � �% � � � I I � I I � 8RT ��1�,2�� � � _ _ � � � � � � ( � � � UP � � PROJEGT LOG�TION: � � � � i i i i � � � � ; / I I I I I I / � } I � o � � � � I I I I � % � � � o � � I I � a � � / � � I I REC ROOM I I � � I I 001 I I W � � � I � I � I � I � o � � STORAGE Q � � � � � � � � � � � . � I I I I � �����//r � � I � � �w v�i I % I I � I I % ��� �� � o � � I � ��I � GARAGE ? � � j I � I % � 000 W � � � � HOME OFFICE � I � I � I I I j � � � � � 4 OOZ IL � % I I I �j I I I � �%/%//%%/%�/�i � GONG 5�3B O�GRADE � � � � A3.0 � � � I � I I � I � � � � � d � � � � � � � w � �, , � W � J � W � � i 2 � � z I \ � � � I A3.0 � � � � I � � \ \ � \ / / i / / 7 � — � � � � � j���/ / x \ ����j � � � � V UP /j� I j � � j I � � // I � � � , , , , \ , W z 0 - - - - - - - - - - � � z - z , , , , \ , pz - i -i - - - - - - - i � - ' J � � � � I I I I I I GR�WLSP?�GE _ n n/ � Q l� � I L _ J I I I � I I - - -J I I � � QO 1J- � � � � _ J � � � � � I I I I SA�WGUT (N) � I � � � NEW O I � GRP�WLSPI�GE i i �GGE55 � � �� J i i � I I I I i � I I I I � � I I I I � � i i I — — - I � — — — - — — - — — — — � i i � - - - - - - - - - - - - - - - - - - - - - - - - - � Revisions: 1 A3.0 Y 0 a. W � � W � (N) FDN / BASEMENT � ° ~ A2.5 = o � SCALE: 1/4" = 1'-0" �, W � Ja ¢ i�rint Date: 3/2 '7/ 1 '7 m U W _ - _ a -' � z a � � � 0 0 z m o PROJ�GT #: 20 1 l� 1 � � � _ o � o ; � � Diz�YVN BY: GEG waW - _ � a � � � � Z W D� . q/2016 wZw � ¢ a � Z ~ �����5�� � U � C� w � u� z � � w � = w o � � � o �D1� / �3�51�T oa � � > > w = a a (n = J w ~ ~ � A 5 � o � o SH #: � � aa� o • N � � T � � � O �� � � • �—� � . � w �, ���� � rt rrl t Gommunity e�el, �� � � n � , N U ' � � � M w , ;� ��_ � /� , z � � Pla�ni Di ���r� � � � o � � � w � � AP '����D� -\ ; z Q �UPERTlNO � � � a v ✓�� � . * Ca Se # - - �-- —=' � o � � Q A� 1�C�tio�� Numher�s} � GL�YTO1� D�51G U � a� O o � Appro�a l Bo dy: Di r ctor I��YI G�5 _ � risto her Gla ton, � � Appro�ra I Date 08/ 8/�'�' p y ma n� �..� ����.,�..�, �,.._,.._,.. T.� W �` 51 nature Beth Eb l�en G� Lic. # G-32 '740 I Q g on morency riv � 5an J�o�e, G� q 5 1 1 8 � (408) 666-8544 � Q .� m � Q � � � U � 1 � A4.1 � 59'-7" � 37'-0 7/8" 22'-6 1/8" o I N � I U � > � w � � � � � w � o �' � FIRST FLOOR Q i LP�NDING �PN: � 2 C�-��-�q'8 J U // SR C 6 1/2" � 7TC 1 1" � ❑ �Q PROJEGT LOG�TION: � U � � KITCHEN FAMILY ROOM 0 103 104 Y � 8'GLG 8'GLG 0 m � 0 � U � _ 1'-0" � (B - Q � � G,4R,4GE BELOW / � v o o BEDROOMS A�BOVE � � Z � � - � � � � N � �� N � �,I„1 � � - SR C 6 1/2° �� � � �„�„� � 8'GLG j � �TC 1 1" 8RC 7 1/2" � 4 � �T C 1 2" � � O 2 A3.0 � � � a M O u1 W _ I LIh1E OF 50 FIT _ W J - � � I � — — — — — — — — — — W I � � � � M � v ,O�H > � c? � � � M Q ����/ �� `0 �N � � � � o �� � � � � I L �— — — — — — o� 1/2 BATH W � � . - �'_� �I 105 Z � 0 T.P Q I 0 � � 36"High Guardrail LIVING ROOM �� ENTRY � 5ystem,owner to 101 �� 100 � � � � Select. �lert.balusters _ � � shall not permit the paeeage HDWI�FLR �� 9'GLG of a 4"Dia.5phere. �� �I HDWD�LR � � Q � DN 1 OR c� 6 1/2" �w I M 1 � O � 1 1/2"dia. 9T c 1 1" � � �--� O � � � � � � graspable � � � ~ 4'-0" � handrail � O , u> - v � � 4'-0" � /" Q 127.3 sq ft � � o �� � � �E)�O��ERED � � M 8'-6" ' Sill '-8" Sill '-8" Sill '-8" T.P � � � DN � 0 0 0 0 0 0 � � Revisions: (V � � � CV � US U.S U.S 11'-3 7/8" 12'-7 1/8" 3'-11 1/8" 1'-10" 9'-0" 1'-10" � 40'-6 1/8" 19'-0 7/8" I 1 A4.1 1 A3.0 � NEW FIRST FLOOR PLAN � � A2.6 SCALE: 1/4" = 1'-0" o � � � U � w � O ~ w = _ � U � w � Ja ¢ i�rint Date: 3/2 '7/ 1 '7 m U W _ - _ a -' � z a � � � 0 0 z m o PROJ�GT #: 20 1 l� 1 � � � _ o � o ; � � Diz�YVN BY: GEG waW - _ � a � � � � Z W D� . q/2016 wZw � ¢ a � Z ~ �����5�� � U � C� w � u� z � � w � = w o � � � o �IRST �LOOiZ oa � � > > w = a a (n = J w ~ ~ � A � o � o SH #: g o aa� o • N � � T � � � O �� � � • �—� � . � w �, ���� � rt rrl t Gommunity e�el, �� � � n � , N U ' � � � M w , ;� ��_ � /� , zo � � w � P I a�n i D i ����r� � �� � � � , - �,np �i � ; z = �UPERTlNO Ar F��V,�� ' O � • � � Ca se # I R-201 -09 �' a " �,,_ —= � � � z � � -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - — Ap 1�C�tio�� Numher�5} � o � GL�YTO1� D�51G �- " e Appro�� l B dy: Dir ctor I��YIG�S � ~ ristopher Glayton, �� w � � � � Appr��ra I D te 08/ 8/�'�' � � m � oo r�i �..i i i��.,�..�, �,.._,.._,.. r.i W �` � 51 nature Beth Ebl�en G� Lic. # G-32 '740 I g Q ■ ■ ■ '' on morency riv � N 5an J�o�e, G� q 5 1 1 8 J - — - — - — - — - — - — - — - N (408) 666-8544 � Q _ \ � _ - M � m \ 0 � Q M c - — - — - — - — - — - — - — - — - — - — - — - � U � - — - — - — - — - — - — - — - — - — - — - — - � � a0 O cB I� - — - — - — - — - — —— � � \ � U N � N � � � 0 N (A —— - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - - — - — - — - — - — - — - — - — - — - — - W U � > ' � � � w (N) � z � � w 0 z p - — - — - — — - —— Q �PN: 32C�-O�-048 J �U � � PROJEGT LOG�TION: � � U O � � O N Y O O m � U �(B � � � � CHAN4 REAR ELEVATION 4 LEFT ELEVATION N W z � � � � A3.0 SCALE: 1/4" = 1'-0" A3.0 SCALE: 1/4" = 1'-0" � 11 ' � � � !�l ` O _ � � /- a '� � a W O � � �/ � 0 � � � � � � � � � W � � ' , � zz0 Ozz � \ _ � � ~ � - � � � Q Q o u� = Q o �- u � � � � ❑ � 0 , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ � � � � � - - - - - - - - - - - - - Revisions: (E)WOOD SHAKE ROOF,TYP.THROUGHOUT � � - — - — - — - — - — - — - — - - — - — - — - — - — - — - — - — o � � � _ � � - - - - - ' /— - - - - - - - - i . � I I � � � � ����� o � � -- - - -- Y ����� a. W � O `� � M Q o F — — - - — - — � - _-- --- __ -- w ����� o = u=j w � � - - Ja ¢ � r�,Bo�RD�B,�TTE" �rint Date: 3/2 '7/ 1 '7 f° � W SIDING,TYP THROUGHOUT. ����� � - _ -- -- aaF _ _- - --_ _ ? � ,� TOPOFBASEMENTSLAB - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - � � �� � 00 J z m o PROJ�GT #: 20 1 l� 1 � � � _ o � o ; � � Diz�YVN BY: GEG waW - _ � a � � � � Z W D� . q/2016 wZw � ¢ a � Z z � � W 2 RIGHT ELEVATION � FRONT ELEVATION �XISTII�G Q � � � A3.0 SCALE: 1/4" = 1'-0" A3.0 SCALE: 1/4" = 1'-0" �L���T I O l�l 5 � � o oa ~ � � } w = o ¢ (n = J w ~ ~ � A � o � o SH #: � � Q M a � . o � � � � � �U o �� � N f� . �.—� � w �, ���� � rt rrl t N � Gommunity e�el, �� � � n � ;� , M W �� '-� � � � � . �� v /� � z � � Pla�ni Di ���r� � � � o � �, _ � ; w AP ��'����D� � � , z Q �UPERTlNO � � � a v ✓�� � . � Ca Se # - - �-- —=' o � � Q � Ap �c�t�o�� Num er 5 � o GL�YTO1� D�51G � " Appro�a l Bo dy: Di r ctor I��YI G�5 o � •`�–� w �11'-3 7/8"ROOF BRG. � � A ro�ra I Date 08/ 8/�ristopher Glayton, � pp . � � r�i �..i i i��.,�..�, �,.._,.._,.. r.i W �` � � 51 nature Beth Ebl en G� Lic. # G-32 '740 I Q I � , � � — , _ i i — � � N �8'-0"CLG.OLD ROOF BRG. � - — — — — — — — on morency riv ; , , - ' San Jo�e, G� q 5 1 1 8 ase aE�a er a (408) 666-8544 � Q .� m � Q � � � U � c cB U J,0'-0"FIN. FLOOR � � 0 N � W U � W � Z U � w 0 z O Q �PN: 32C�-O�-048 (Jj J, -9'-7"FIN. SLAB � � PROJEGT LOG�TION: � � U O � � O N � O O m � U �(B � � o Z U a`> � � 2 E NORTH ELEVATION " � � � ( ) Q � p QA3.2 SCALE: 1/4" = 1'-0" � ' '` !.l 1 a �� � � W � � J � � LL � � � � � � � � W � � ' zz0 � zz 0 � _ � u� - � t� Q Qo � = Q o �- 11'-3 7/8"ROOF BRG. � .� � � _ V O r 8'-0"CLG.OLD ROOF BRG. Revisions: J� 0'-0"FIN. FLOOR Y 0 a. W O � � oU � F -9'-7"FIN.SLAB o _ w = _ � U � w � Ja ¢ i�rint Date: 3/2 '7/ 1 '7 m U W _ - _ a -' � z a � � � 0 0 z m o PROJ�GT #: 20 1 l� 1 � � � _ o � o ; � � Diz�YVN BY: GEG waW - _ � a � Q a � z 4 (E) EAST ELEVATION D�T�: q/20 1 6 � � ~ � A3.2 „ ,_ „ �XISTII�G � W " �, SCALE: 1/4 = 1 0 z � � w � = w o � � � o �L���T101�5 oa � � > > w = a a (n = J w ~ ~ � A � o � o SH #: � � aa� o • N � � T � � � O �� � . � � ommunit e�el, ' �� n �� � , � w y , � � � ���� rt m t M W � � v /� � � P I a n n i D i ����r� � ��� z � � o � w � . � Z �7 �np �i � ; � _ � �LJ�ERTlN4 �r f��V,�� ' O � . * — - - - - - - - - - - - - - - - - - � Case # DIR-201 -09 ,� a U �� - —� � o } � Q A� 1�C�tio�� Numher�s} - � e � o GL�YTO1� D�51G o � o ppro I Body: Dir ctor I��YIG�S � � °° l risto her Gla ton, � � Appro I Date 08/ 8/�'�' p y ma � n� �..� ����.,�..�, �,.._,.._,.. T.� o � � le) lx) � N .--�► S ig n a t e B e t h E b e n G� L i c. # G-3 2 7 4 0 Q N on morency riv � _ 5an J�o�e, G� q 5 1 1 8 � z� o (408) 666-8544 Q �i o m - a� � °° o i � w - U � �� N � � I U � � � � - - - — - - — - — - - — - — - - � � o - N I CO � W � U I (r�) � I w � I z � I � o I Z � � 0 Q �PN: 32C�-O�-048 J U � � PROJEGT LOG�TION: � � U O � � O N Y O O m � U �(B � � � � (N) LEFT ELEVATION N W z � ? A3.1 SCALE: 1/4" = 1'-0" � �„�„' � , u � _ = Q o a 0 � �n a �� � (�/ � W J � LL � - � � � � � � � W � tn . zz0 � zz 0 � _ � u� — � t� Q Qo � = Q o �- � ❑ v � � � 0 � � � � - - - - - - - - - - - � Revisions: (h!)WOOD SHAKES TO M,4TGH(E). NE�"� I EXISTING � ► � � 0� � �I �..I I �I , _ , � p QI � � �N) �N) �N� pl z I ����� (N)BOARD d � BATTEN 51DING � - - Y o �TO MATGH(E). � ��������� � w - _ o ? � _ _ � � W I�I� ��� � o ~ w - - _ � U � W � ����� Ja ¢ - - �rint Date: 3/2 '7/ 1 '7 - m U W _ ' � - = TOP OF BASEMEh1T SLAB � ���� � a -' � - - - - - - - - - - - - - - - - - - - - - - - - - - - - z a � � � 0 0 z m o PROJ�GT #: 20 1 l� 1 � � � _ o � o ; � � Diz�YVN BY: GEG w a W - D'������ _ � a � � � � z w wzw cn ¢ a ~ z ~ ~ ��O�IT �1�D � U � C� w � u� z � � w � � � o � (N) FRONT ELEVATION 1—��T oa � � w = a a A3.1 SCALE: 1/4" = 1'-0" �L�� O 5 (n = J W ~ F U � o � o SH��T #: . � N Q M a � . o � � � � � �U o �� � N ' f� . �.-'� N � �,����� � rtm t Gommunity e�el; �� � n� ( � , M w , ;% �--� ��I V� -- � . . zo � � �� � o �, P I a�n 1 D i ����r� � �� � o � w �p �/ � zQ � � _, , �� � ��� _ �, _,, � �CLJ�ERTINO A� f'� ��� l,— � U �� � d \ � • � � Case # DIR-201 -09 �' �,\_ —; o � � Q U � \ Ap 1�C�tio�� Numher�s} �, o e \ GL�YTO1� D�51G Appro�a l Bo dy: Di r ctor I��YI G�5 U o � � � � � A ro�ra I Date 08/ 8/�ristopher Glayton, � � pp �, �� ������, ���,.. T.� � (e) lx) W �` .--�► Signature Beth Eb en G� Lic. # G-32740 N �5� aE�oe� morency riv ; 5an Jo�e, G� q 5 1 1 8 a z� (408) 666-8544 Q oi � �� a� m a Q �� � � w� U c I � cB � � U � � � c� 0 � N � U I (r�) � I w � I z � I � w � 0 z � O Q �PN: 32C�-O�-048 J U � � PROJEGT LOG�TION: � � U O � � O N � O O m � U �(B � � � � (N) LEFT ELEVATION � W z � ? A3.2 SCALE: 1/4" = 1'-0" � �„�„' � , u � _ = Q o a 0 � �n a � W � � � J � LL � - � � � � � � � W � tn . zz0 � zz 0 � _ � u� — � t� Q Qo � = Q o �- � ❑ v � � � 0 � � � � � Revisions: NEW I EXISTING � ► � � � I 0� � Q� QI Q �N) �N� �N� pl z I ����� I __ - - __ � � � ����0 o � � - - � � W 1�11��I ��� oo � w - - _ � U � W � ����� Ja ¢ �rint Date: 3/2 '7/ 1 '7 - - - m U W -_ _- _ ' _ — � ��� � a -' � - - z a � � � 0 0 z m o PROJ�GT #: 20 1 l� 1 � � � _ o � o ; � � Diz�YVN BY: GEG w a W - D'������ _ � a � � � � z w wzw cn ¢ a ~ z ~ ~ ��O�IT �1�D � U � C� w � u� z � � w � � � o � (N) FRONT ELEVATION 1—��T oa � � w = o 'a A3'2 SCALE: 1/4" = 1'-0" �L�� O 5 (n = J W ~ F U � o � o SH��T #: . � � aa0 � • N � � T � � � O �� � � • �—� � . � w �, ���� � rt rrl t Gommunity e�el, �� � � n � , N U ' � � � M w , ;� ��_ � /� , z � � Pla�ni Di ���r� � � � o � � � w � � AP '����D� -\ ; z Q �UPERTlNO � � � a v ✓�� � . * Ca Se # - - �-- –=' � o � � Q A� 1�C�tio�� Numher�s} � GL�YTO1� D�51G U � a� O o � Appro�a l Bo dy: Di r ctor I��YI G�5 _ � risto her Gla ton, � � Appro�ra I Date 08/ 8/�'�' p y ma n� �..� ����.,�..�, �,.._,.._,.. T.� W �` 51 nature Beth Eb l�en G� Lic. # G-32 '740 I Q g on morency riv � 5an J�o�e, G� q 5 1 1 8 � (408) 666-8544 � Q .� m � Q � � � U c cB � U � � 0 N � W U � w � Z U � w 0 z � �PN: 32C�-O�-048 J U � � PROJEGT LOG�TION: � � U O � � O N Y O O m � U �(B � � � �� � z � � ? v � � � _ (a �` O a � '� � a W 0 � � � � 0 � � � � � � � � � W � � ' � ZZ � � �■■ Z � 0 � � � f � � — � , Q Q o u� = Q o �- 0 u � � � 0 � � � . Revisions• ii ii ii ii ii �ii ii ii ,� ��������������� I I � ZI I Y � `° �II � w o � � � � U I I ); � W I I � O ~ w = _ � U � w � Ja ¢ �rint Date: 3/2 '7/ 1 '7 m U W _ - _ a -' � z a � o o /� Y Y Y Y Y Y Y J z m o PROJ�GT #: 20 1 l� 1 � � � � ������������������������������������������������`�`�`�`� �`�`�`�`�`� D R�YV N B Y: G E G o � W r � U W Q W - _ � a � � � � Z W D� . q/2016 wZw � aa ~ Z � STAIRA ~ ~ �3UILDII�G � U � � C� w u� z � � w _ = w o A4.1 SCALE: 1/4" = 1'-0" a � � Z 5�GT101�5 � � o oa � � > > w = a a (n = J w ~ ~ � A � o � o SH #: