HomeMy WebLinkAboutAH Packet 2-23-2017 CITY OF CUPERTINO
r
�
J
AGENDA
��������� ADMINISTRATIVE HEARING
10300 Torre Avenue, City Hall Conference Room C
Thursday, February 23, 2017
5:00 PM
ROLL CALL
APPROVAL OF MINUTES
1. Sub'ect: approval of Draft Minutes of February 9, 2017
Recommended Action: approve or modify the Draft Minutes of February 9, 2017
Draft Minutes of February 9,2017
ORAL COMMUNICATIONS
This po�tion of the meeting is �ese�ved fo� pe�sons wishing to add�ess the membe�s on
any matte� not on the agenda. Speake�s a�e limited to th�ee (3) minutes. In most cases,
State law will p�ohibit the council f�om making any decisions with �espect to a matte�
not l isted on the agenda
WRITTEN COMMUNICATIONS
PUBLIC HEARING ITEMS
2. Sub'ect: Modification of an existing Use Permit (6-U-86 and M-2009-OS) to
consider allowing a private school/daycare center to operate where an afterschool
care is currently allowed and a Director's Minor Modification to allow
installation of an outdoor play structure. (Application No. (s): U-2016-02 and
DIR-2016-34; Applicant(s): Diane Hsu (Christian Light and Salt Foundation);
Location: 940 S. Stelling Road; APN: 359-25-041)
Recommended Action: That the Hearing Officer approve the Modification to the
Use Permit (U-2016-02) and the Director's Minor Modification (DIR-2016-34) per
the draft resolutions.
Postponed from the February 9, 2017 meeting
Administrative Hearing Officer's decision final unless appealed
CITY OF CUPERTINO Page 1
Administrative Hearing AGENDA February 23,2017
Staff Report
1 -Draft Resolution(Modification to the Use Permit�
2 -Draft Resolution(Director's Minor Modification�
3 -Applicant Proj ect Description
4 -Noise Study
5 -Plan Set
OLD BUSINESS
NEW BUSINESS
ADJOURNMENT
In compliance with the Ame�icans with Disabilities Act (ADA), anyone who is planning
to attend the next yneeting who is visually o� hea�ing impai�ed o� has any disability that
needs special assistance should call the Cily Cle�k's Office at 408-777-3223, 48 hou�s
in advance of the meeting to a��ange fo� assistance. Upon �equest, in advance, by a
pe�son with a disabilily, meeting agendas and w�itings dist�ibuted fo� the meeting that
a�e public �eco�ds will be made available in the app�op�iate alte�native fo�mat. Also
upon �equest, in advance, an assistive listening device can be made available fo� use
du�ing the meeting.
Membe�s of the public a�e entitled to add�ess the membe�s conce�ning any item that is
desc�ibed in the notice o� agenda fo� this meeting, befo�e o� du�ing conside�ation of
that item. If you wish to add�ess the membe�s on any othe� item not on the agenda, you
may do so du�ing the public comment po�tion of the meeting. Please limit you�
comments to th�ee (3) minutes o�less.
CITY OF CUPERTINO Page 2
Cupertino, CA 95014
(408) 777-3308
ACTION MINUTES OF THE REGULAR MEETING OF
THE ADMINISTRATIVE HEARING HELD ON February 9, 2017
ROLL CALL
Hearing Officer present: Benjamin Fu, Assist. Director of Community Development
Staff present: Ellen Yau, Assistant Planner
Applicant(s) present: Aaron Zuzack, Browman Development
APPROVAL OF MINUTES:
1. Minutes of December 8, 2016
The minutes of December 8, 2016 were approved as written
POSTPONEMENTS/REMOVAL FROM CALENDAR:
Item #2 Amendment to an existing Use Permit to allow a private school/daycare center to expand their
hours of operation to 7:OOam to 6:OOpm and a Director's Minor Modification to allow modifications to
the site including installation of an outdoor play structure
Postponed to February 23, 2017
ORAL COMMUNICATION:
None
WRITTEN COMMUNICATIONS:
None
PUBLIC HEARING ITEMS:
2. Application No.(s): U-2016-02, DIR-2016-34
Applicant: Dian Hsu (Christian Light 8� Salt Foundation)
Location: 940 S Stellling Road APN#: 359-25-041
2 Administrative Hearing
February 9,2017
Amendment to an existing Use Permit to allow a private school/daycare center to expand their
hours of operation to 7:OOam to 6:OOpm; Director's Minor Modification to allow modifications
to the site including installation of an outdoor play structure.
Postponed to the February 23, 2017 meeting
PUBLIC MEETING:
2. Application No.(s): ASA-2015-14, ASA-2015-28, TR-2015-27, SP-2015-06
Applicant: Aaron Zuzack (BDC Hayward, LP)
Location: 10385-10497 S De Anza Boulevard APN#: 359-17-019, 023
Architectural and Site application to allow building f a�ade improvements and site
modifications at an existing shopping center (McClellan Square); Tree Removal Permit to
allow the removal and replacement of twenty-nine protected trees in conjunction with the site
modifications; Sign Program application to make changes to the Master Sign Program for the
shopping center.
Administrative Hearing decision final unless appealed.
Staff Member Yau went over the site plan. The McClellan Square is a shopping center located
on the corner of McClellan Road and S. De Anza Boulevard and is comprised of one large pad
building and three smaller pad buildings. It is located in a CG Zone. The applicant is
proposing to make contemporary fa�ade changes to update the look of the buildings (roofing,
wooden slats around the windows, stone wall treatments, and cantilevered roof s). The heights
of the buildings will not change as a result of these fa�ade upgrades. The applicant is also
proposing landscaping improvements including planters of various sizes, benches and
lighting. Two new trash enclosures will be installed — one behind the multi-tenant building
and one behind the bank. The applicant is requesting to remove 29 trees, to be replaced with
31 trees. The removal and replacement of these trees will be done in phases. The applicant has
an expired Tree Removal Permit for different 12 trees on the site. The applicant is required to
submit a new Tree Removal Permit for those trees, their removal is not part of the application
being heard today. Additionally, the applicant is requesting changes to the Master Sign
Program for the shopping center. The modifications will incorporate the new fa�ade colors and
aesthetics. The ground signs will also be upgraded to match the new site improvements. The
applicant will be making significant street improvements consisting of a detached sidewalk
and modification of the curb and driveway approaches. They will be adding art and green
screens to provide visual enhancements, a pedestrian walkway and bike racks. All the
landscaping will be evaluated to ensure compliance with the Water Efficiency Ordinance. Staff
supports the approval of the applications per the draft resolutions.
3 Administrative Hearing
February 9,2017
The Hearing Officer asked for clarification regarding the building heights. The applicant,
Aaron Zuzack, addressed the Hearing Officer. He said that the building heights are not
generally changing. There is a tower feature on one of the buildings that will be about 31/2' feet
above the roofline. He pointed out a couple of sheets in the plan set that show that the
rooflines are the same or are slightly lower. He also mentioned that the proposal includes a
change in the parking lot between the two parcels to improve the traffic circulation. The
Hearing Officer asked the applicant about the rooftop mechanical equipment as they weren't
shown on the plans. The applicant said that the equipment will be screened from view to the
best of their ability.
The Hearing Officer opened the item for Public Comment:
A City resident, Jennifer Griffin, thanked the applicant for keeping the grocery store and the
CVS pharmacy in the center. She felt that these businesses were needed in this part of town.
She appreciated that the building heights were going to remain the same. She commented on
street frontage and wanted large street and parking lot trees that will provide shade.
The Hearing Officer closed the Public Comment period.
Staff inember Yau wanted to let the Hearing Officer know that comments had been received
regarding the project and that those comments had been addressed by Staff and in the Staff
Report. Staff inember asked the applicant to clarify the construction time line. He stated that
they hoped to start construction in June and that is was anticipated to take about 4 to 6
months. The trees would be removed and replaced in phases. He was aware of the City's
construction hours and of the shopping center's operating hours.
The Hearing Officer concurred with Staff's findings that the proposed new changes will be a
great enhancement to the shopping center. He thanked the applicant for their thoughtful
design.
DECISION: The applications were approved per the draft resolutions
ADJOURNMENT
Respectfully submitted:
/s/Beth Ebben
Beth Ebben
Administrative Assistant
g:planning/AH Committee/Minutes020917
OFFICE OF COMMUNITY DEVELOPMENT
PLANNING DIVISION
,
' ' CITY HALL
10300 TORRE AVENUE •CUPERTINO, CA 95014-3255
(408)777-3308• FAX(408)777-3333
���������
ADMINISTRATIVE HEARING STAFF REPORT
Agenda Date:Februarv 23, 2017
SUBJECT
Modification of an existing Use Permit (6-U-86 and M-2009-05) to consider allowing a private
school/daycare center to operate where an afterschool care is currently allowed and a Director's
Minor Modification to allow installation of an outdoor play structure. (Application No. (s): U-
2016-02 and DIR-2016-34; Applicant(s): Diane Hsu (Christian Light and Salt Foundation);
Location: 940 S. Stelling Road;APN: 359-25-041)
RECOMMENDED ACTION
That the Hearing Officer approve the Modification to the Use Permit (U-2016-02) and the
Director's Minor Modification(DIR-2016-34)per the draft resolutions (Attachment 1 and 2).
DISCUSSION:
Application Summary:
1. Modification to an existing Use Permit (M-2009-05 and 6-U-86) to allow for private
school/daycare center to increase their hours of operation to 7:00 am to 6:30 pm with a total
of 70 students, and
2. Director's Minor Modification to allow for an outdoor play structure.
Proj ect Data:
General Plan Designation: Quasi-Public
General Plan Neighborhood: Jollyman
Zoning Designation: BQ (Quasi-Public Building)
Lot Area/Acreage: 67,114 sq. ft./1.49 acres
Building SF: Existing Proposed
Building A: 1,985 s uare feet
Building B: 1,894 s uare feet No Change
Building C: 2,091 s uare feet
Parking Stalls Required Proposed
Vehicular Parking 57 stalls No Change
U-2016-02&DIR-2016-34 940 South Stelling Road February 23,2017
Page 2
Proj ect Consistency with:
General Plan: Yes
' Yes
Zoning:
Environmental Assessment: Categorically Exempt
Analysis:
Background
The project site is zoned Quasi-Public Building (BQ). The BQ zone is designed to accommodate
religious, community service, child care, residential care, or recreational facilities in the City.
In 1986, the Planning Commission approved a Use Permit (6-U-86) to allow the existing church
with approximately 180 attendees, ancillary church-sponsored activities and incidental
community service functions.The BQ zoning district allows child care uses,including afterschool
care uses and daycare facilities,with a Conditional Use Permit.In 2009,the Planning Commission
approved modifications (M-2009-05) to allow an afterschool program for up to 90 children to
operate between 12:00 p.m.and 6:30 p.m.from Monday through Friday.The afterschool program
operated between 2009 and June 2016.
Applicant Requests
The applicant,Diane Hsu,representing the property owner,Christian Light and Salt Foundation,
is proposing to operate an all-day private pre-school/daycare use and install a new play yard and
play structure.
If the proposed project is not approved or a different afterschool operator does not commence
operations by July 1, 2017, the use permit for this use will expire and a new use permit will have
to be obtained.
Site Location:
The project site is located at the �°������q�f ' �. Figure 1: Aerial Photo *. '� -
� , �",� . , ,.,�
southeast corner of South Stelling �,78 � ' � , , � :.� ,a;-,, � ,.� - _r- � - -
u �
Road and Joll man Lane.It is bounded �� - �; -� - � - �'°ie° ��
y , � ^�� �-: �: � � ,�:fi.!.�. , -
o a7
'� 'l09?'� 1 Q' a, o �. I � 1 �
by single-family residences to north, , ��'� ' �, . -'�; LN '.." • �,;;,�:
� . .�-�� � e � .�
east and west. oll man Park abuts the � .:�--�
, J Y . -���, •� :�.. � -� .� ��
�� !�L + �+v� r •� • ''� '� }� 7086s
property to the south. �w .� � �� �� �
. o. t w,
■_ �., � � �« ;�
�_� � ,�� } � �/, � �,� �� ■
i � .;• ��' : _ � t � ;�,��
i
Modification to Use: � � ��� � `: ��,� -� � � . ..; . • ' '
��-_ .� r, . , .�
� � �_., . <<
� 940 ���F�7c; .r7»
The ro osed rivate re-school/da � � r� -,, � � -��-. ��
p p p p Y �� �-
� � t�,� �� ��
care use (see Attachment 3) would �� � � G��r��--' . - � -
_ �� �j y
have a maximum of 70 students and � `� �� � . ����: ��� w�*� .' ` t
, � � � 4- �� � .-,,�
ei ht 8 staff inembers at an iven � �, . °�, ; �t: , � � '
g ( ) y g �� r � t � � �:�. Project
�.... , •.�,4` ��� - ■
time. The ro ram is desi ned for �=�- �y - �, ��
p g g
U-2016-02 8�DIR-2016-34 940 South Stelling Road February 23,2017
Page 3
children between the ages of two and six years old. Children will be signed in and out by their
parents/guardians. No changes are proposed to the other uses on the site. The proposed use is
compatible with the other uses allowed on the site. The operations will be reviewed by the
California State Department of Licensing, and must comply with Building and Fire Department
requirements prior to final occupancy.
Parking and Traffic:
The pre-school needs a maximum of eleven (11) parking spaces (1 space for every 6.5 students
per Municipal Code). There are 57 parking spaces on site. The applicant has indicated that no
additional uses, besides church office uses, will run concurrent with the pre-school. Therefore,
there is adequate parking at the site to accommodate the proposed use. In addition, the applicant
has indicated that as part of their traffic management strategy, which parents are required to
adhere to, parents will be notified to park in the parking lot during pick-up and drop-off.
The City's Traffic Engineer has determined that the amount of traffic added during the morning
or afternoon peak commute hour with the existing and modified project is minimal.Furthermore,
the proposed project reduces the number of students that would be allowed from 90 to 70.
Therefore, the proposed use would not create a significant impact on traffic requiring additional
mitigation.
Site Improvements
Outdoor Play Structure and Improvements:
A new six (6) foot redwood fence and gate will be located approximately 32' from the northern
property line to enclose the area adjacent to the church building. The church proposes to further
enclose approximately 1,350 square feet with a secondary fence for a play yard. The play yard
will contain a play structure.The yard will be paved with a Poured in Place(PIP)rubber material.
The play structure measures approximately 14 feet in height and is proposed to be setback
approximately 55 feet from the closest residential property (located to the east). The location of
the play structure is in compliance with Chapter 19.100 (Accessory Structures/Buildings) of the
Municipal Code.
As is required with uses that have the potential to cause noise impacts, a Noise Impact and
Mitigation Study was prepared by Environmental Consulting Services, the City's acoustical
consultant (Attachment 4). The noise study indicated that the nearest sensitive receptors were
two single-family dwelling along the eastern property line. Homes located along Jollyman Lane
are not considered significant receptors because they would be located approximately 300 feet
from the play yard with the new six (6) foot solid board fence acting as an additional buffer.
Activities from the proposed use could create intermittent noise of 50 to 60 dBA at a distance of
30-40 feet with the play yard. This is expected to be 12 to 13 dBA lower in the yards at each of the
two residences due to the wooden fence at the shared property line. Therefore, the noise study
concluded that the proposal would not create any noticeable noise impact on nearby properties.
U-2016-02&DIR-2016-34 940 South Stelling Road February 23,2017
Page 4
NOTICING AND COMMUNITY OUTREACH
The following table is a brief summary of the noticing conducted by the City for this project:
Notice of Public Meeting&Site Signage Agenda
■ Posted on the site (10 days prior to hearing) ■ Posted on the City's official notice
■ 48 notices mailed to property owners bulletin board (one week prior to hearing)
adjacent to the project site (10 days prior to ■ Posted on the City of Cupertino's Web
hearing) site (one week prior to hearing)
In addition, the Applicant conducted two public meetings on February 10th, 2017 at 10:00 a.m.
and 4:00 p.m.to help the neighbors understand the particulars of the project and receive feedback.
The meeting was attended by four (4) neighbors.
Public Comments
Staff received comments which are summarized below. Staff responses follow in italics:
1. Questions about the permitted uses. See "Background"section.
2. Questions about the expiration of the existing afterschool use allowed on the site. See
"Background"and "Modification to Use"sections.
3. Questions about the details of the proposed project. See "Modification to Use"section.
4. Concerns about parking and traffic impacts. See discussion in "Modification to Use"and "Site
Improvements"section re:parking and traffic impacts.
Parking on public streets (unless restricted via permit parking) is available to the general public for a
period of 72 hours. If it is perceived that a violation has occurred with respect to parking, the Code
Enforcement Division should be notified. Another avenue to further limit public parking in the
neighborhood is to apply to be a permit parking area.
5. Concerns about noise impacts. See "Site Improvements"section.
6. Safety Concerns. Discussion with the Sheriff's Department indicated that the neighborhood has not
been the subject of extra-ordinary security issues due to the church's location and activities.
7. Concerns about commercial uses (day care uses) being allowed in neighborhoods. See
discussion in "Background"section re: allowed uses in BQ zones.
PERMIT STREAMLINING ACT
This matter is adjudicatory and is subject to the Permit Streamlining Act (Government Code
Section 65920 — 65964). The City has complied with the deadlines found in the Permit
Streamlining Act.
Project Received:July 29, 2016; Deemed Incomplete: September 1, 2016;
Project Resubmitted:December 12, 2016; Deemed Incomplete: December 21, 2016
Project Resubmitted:January 5, 2017; Deemed Complete:January 20,2017
The City has 60 days (until March 21, 2017)to make a decision on the project.
U-2016-02 8�DIR-2016-34 940 South Stelling Road February 23,2017
Page 5
ENVIRONMENTAL REVIEW
This project is categorically exempt from the requirements of the California Environmental
Quality Act (CEQA, Section 15301, Class 1, existing facilities).
CONCLUSION
Staff recommends approval of the Use Permit Modification and Director's Minor Modification,
since the plans and conditions of approval address all concerns to the proposed project.
Additionally, all of the findings for approval of the proposed project, consistent with Chapter
19.156 and Chapter 19.164 of the Cupertino Municipal Code,may be made as reflected in the draft
resolutions.
NEXT STEPS
Should the project be approved, the Hearing Officer's decision on this project is final unless an
appeal is filed within 14 calendar days of the date of the mailing of the decision. All approvals
granted by the Hearing Officer shall go into effect after 14 days.
Upon project approval, the applicant will be able to submit building permit drawings to enable
construction to commence. These approvals expire on February 23, 2019, at which time the
applicant may apply for a one-year extension.
Prepared by: Erick Serrano, Associate Planner
Reviewed and Submitted by: Piu Ghosh, Principal Planner
ATTACHMENTS
1- Draft Resolution (Modification to the Use Permit)
2- Draft Resolution (Director's Minor Modification)
3- Applicant Project Description
4- Noise Study
5- Plan Set
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
DRAFT RESOLUTION
OF THE ADMINSTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO
MODIFYING AN EXISTING USE PERMIT TO ALLOW A DAYCARE USE TO
OPERATE AT 940 S. STELLING ROAD
SECTION I: PROTECT DESCRIPTION
Application No.: U-2016-02
Applicant: Diane Hsu (Christian Light and Salt Foundation)
Location: 940 South Stelling Road (APN 359-25-041)
SECTION II: FINDINGS
WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an application
to allow a modification to an existing Use Permit to allow a daycare center to operate in a
Quasi-Public Building Zone; and
WHEREAS, the project is categorically exempt from the California Environmental Quality Act
(CEQA); and
WHEREAS, the necessary public hearing notices have been given as required by the Procedural
Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least
one public hearing in regard to the application; and
WHEREAS, the applicant has met the burden of proof required to support said application; and
WHEREAS, the Administrative Hearing Officer finds:
1. The proposed development and/or use, at the proposed location, will not be detrimental or
injurious to property or improvements in the vicinity, and will not be detrimental to the
public health, safety, general welfare, or convenience;
A daycare center will not be detrimental or injurious to property or improvements in the
vicinity, and will not be detrimental to the public health, safety general welfare, or
convenience. Noise impacts from the proposed project would be mitigated by new or
existing wooden fences located on the site or at the shared property lines. The proposed
use provides a convenience to the community, including potentially low-cost child care
services.
Draft Resolution U-2016-02 February 23,2017
Page 2
2. The proposed development and/or use will be located and conducted in a manner in accord
with the Cupertino Comprehensive General Plan, underlying zoning regulations, and the
purpose of this title and complies with the California Environmental Quality Act (CEQA).
The proposed project is consistent with and will be conducted in a manner in accordance
with the General Plan, Zoning Ordinance and is consistent with previous approvals. The
proposed use will be reviewed further by the CA State Department of Community Care
Licensing, Building Department and Fire Department to ensure compliance with rules
and regulations for pre-schools. Furthermore, the use is categorically exempt under
CEQA in that the proposed project involves negligible changes to an existing use.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted
in this matter, subject to the conditions which are enumerated in Section III and IV of this
Resolution beginning on Page 2 thereof, the Application No. U-2016-02 is hereby approved; and
that the sub-conclusions upon which the findings and conditions specified in this Resolution are
based and contained in the public hearing record concerning Application U-2016-02 as set forth
in the Minutes of the Administrative Hearing Meeting of February 23, 2017, and are incorporated
by reference as though fully set forth herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT
DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the plan set entitled "Playground Furniture Installation at Good
Shepherd Christian Church, 940 S. Stelling Road, Cupertino CA" consisting of six (6)
sheets labeled as A0.1, A1.1, A1.2, A2.1, L-1 drawn by RCUSA Corporation, two (2)
sheets from Playcraft Systems, and project description dated received January 5, 2017,
except as may be amended by conditions in this resolution.
2. ACCURACY OF PROTECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks, property
size, building square footage, any relevant easements and/or construction records. Any
misrepresentation of any property data may invalidate this approval and may require
additional review.
3. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the
first page of the building plans.
Draft Resolution U-2016-02 February 23,2017
Page 3
4. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file no. DIR-2016-34 shall be applicable to this
approval.
5. PREVIOUS CONDITIONS OF APPROVAL
All previous conditions of approval, in accordance with 6-U-86, Resolution No.2777 as
approved by the Planning Commission on February 3, 1986, and the modification the
use permit M-2009-05, Resolution No. 6559 as approved by the Planning Commission on
June 23, 2009, shall remain in effect except as may be amended by conditions contained
in this resolution.
6. ALLOWED USES
A private school/daycare use is allowed to operate on the site between the hours of 7:00
a.m. and 6:30 p.m. for a maximum of 70 students.
7. TRAFFIC MANAGEMENT PLAN
The day care operator will in their welcome packages, and with on-site signage, inform
parents/guardians of enrolled students that, in the interests of being good neighbors, on-
street parking should be avoided, including during pick up and drop off.
8. FUTURE REVIEW OF USE PERMIT
In the event of any documented substantial problems, the City reserves the right to
review this use permit at any time for additional mitigation measures or revocation of
the use permit.
9. SIGNAGE
Signage is not approved with this use permit application. The applicant shall be
required to submit an application for a sign program and signage prior to installation of
any signage on site. Signage shall conform to the City's Sign Ordinance.
10. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the Community
Development Department.
11. INDEMNIFICATION
Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless
the City, its City Council, and its officers, employees and agents (collectively,the
"indemnified parties") from and against any claim, action, or proceeding brought by a
third party against one or more of the indemnified parties or one or more of the
indemnified parties and the applicant to attack, set aside, or void this Resolution or any
permit or approval authorized hereby for the project, including (without limitation)
reimbursing the City its actual attorneys' fees and costs incurred in defense of the
Draft Resolution U-2016-02 February 23,2017
Page 4
litigation. The applicant shall pay such attorneys' fees and costs within 30
days following receipt of invoices from City. Such attorneys' fees and costs shall include
amounts paid to counsel not otherwise employed as City staff and shall include City
Attorney time and overhead costs and other City staff overhead costs and any costs
directly related to the litigation reasonably incurred by City.
12. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees, dedication
requirements, reservation requirements, and other exactions. Pursuant to Government
Code Section 66020(d) (1), these Conditions constitute written notice of a statement of
the amount of such fees, and a description of the dedications, reservations, and other
exactions. You are hereby further notified that the 90-day approval period in which you
may protest these fees, dedications, reservations, and other exactions, pursuant to
Government Code Section 66020(a),has begun. If you fail to file a protest within this 90-
day period complying with all of the requirements of Section 66020, you will be legally
barred from later challenging such exactions.
SECTION IV: CONDITIONS ADMINSTERED BY THE BUILDING DEPARTMENT
13. BUILDING PERMIT ISSUANCE
A building permit is required for the alteration to the classrooms and the installation of
the playground structure to guarantee compliance to the 2016 California Building
Codes.
PASSED AND ADOPTED this 23rd day of February, 2017 at a noticed Public Hearing of the
Administrative Hearing Officer of the City of Cupertino, State of California, held by the
Director of Community Development, or his or her designee, pursuant to Cupertino Municipal
Code Section 19.12.120.
ATTEST: APPROVED:
Erick Serrano Benjamin Fu
Associate Planner Asst. Director of Community Development
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION NO.
OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO
ALLOWING MODIFICATIONS TO THE SITE INCLUDING INSTALLATION OF AN
OUTDOOR PLAY STRUCTURE LOCATED AT 940 S. STELLING ROAD.
SECTION I: PROTECT DESCRIPTION
Application No.: DIR-2016-34
Applicant: Diane Hsu (Christian Light and Salt Foundation)
Location: 940 South Stelling Road (APN 359-25-041)
SECTION II: FINDINGS
WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an application
to allow for modifications to the site at an existing church including installation of an outdoor
play structure in a Quasi-Public Building Zone;
WHEREAS, the project is categorically exempt from the California Environmental Quality Act
(CEQA); and
WHEREAS, the necessary public notices have been given as required by the Procedural
Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least
one public meeting in regard to the application; and
WHEREAS, the applicant has met the burden of proof required to support said application; and
WHEREAS, the Administrative Hearing Officer finds:
1. The application is a minor change to a plan which has received site and designs approval;
The modifications to the landscaping including, the addition of the new playground structure
and installation of a wooden fence are minor changes to an existing site that had previous
architectural and site approval. The area 2% of the overall site. The proposed modifications
for the project is, therefore, considered minor.
2. The proposed development and/or use will be located and conducted in a manner in accord
with the Cupertino Comprehensive General Plan, underlying zoning regulations, and the
purpose of this title and complies with the California Environmental Quality Act (CEQA).
The proposed project is consistent with and will be conducted in a manner in accordance with
the General Plan and Zoning Ordinance. Additionally, an acoustical study prepared by a
third party consultant using latest best practices has concluded that noise impacts generated
from the project would be "less than significant."Furthermore, the proposed modifications to
Resolution No.__ DIR-2016-34 February 23,2017
Page 2
the site are categorically exempt under CEQA in that involves negligible change to an
existing use or site.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted
in this matter, subject to the conditions which are enumerated in Section III and IV of this
Resolution beginning on Page 2 thereof, the Application No. DIR-2016-34 is hereby approved;
and that the sub-conclusions upon which the findings and conditions specified in this Resolution
are based and contained in the public meeting record concerning Application DIR-2016-34 as set
forth in the Minutes of the Administrative Hearing Meeting of February 23, 2017, and are
incorporated by reference as though fully set forth herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT
DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the plan set entitled "Playground Furniture Installation at Good
Shepherd Christian Church, 940 S. Stelling Road, Cupertino CA" consisting of six (6)
sheets labeled as A0.1, A1.1, A1.2, A2.1, L-1 drawn by RCUSA Corporation, two (2)
sheets from Playcraft Systems, and project description dated received January 5, 2017,
except as may be amended by conditions in this resolution.
2. ACCURACY OF PROTECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks, property
size, building square footage, any relevant easements and/or construction records. Any
misrepresentation of any property data may invalidate this approval and may require
additional review.
3. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the
first page of the building plans.
4. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file no. U-2016-02 shall be applicable to this
approval.
5. PREVIOUS CONDITIONS OF APPROVAL
All previous conditions of approval, in accordance with 6-U-86, Resolution No.2777 as
approved by the Planning Commission on February 3, 1986, and the modification the
use permit M-2009-05, Resolution No. 6559 as approved by the Planning Commission on
June 23, 2009, shall remain in effect except as may be amended by conditions contained
in this resolution.
Resolution No.__ DIR-2016-34 February 23,2017
Page 3
6. SIGNAGE
Signage is not approved with this use permit application. The applicant shall be
required to submit an application for a sign program and signage prior to installation of
any signage on site. All signage shall conform to the City's Sign Ordinance.
7. NOISE CONTROL
Noise levels are not to exceed those listed in Chapter 10.48: Community Noise Control
of the Cupertino Municipal Code, unless approved by special exception by the Noise
Control Officer. The applicant may have to conduct future tests to verify they are
complying with the ordinance at the request of the Community Development Director.
8. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the Community
Development Department.
9. INDEMNIFICATION
Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless
the City, its City Council, and its officers, employees and agents (collectively,the
"indemnified parties") from and against any claim, action, or proceeding brought by a
third party against one or more of the indemnified parties or one or more of the
indemnified parties and the applicant to attack, set aside, or void this Resolution or any
permit or approval authorized hereby for the project, including (without limitation)
reimbursing the City its actual attorneys' fees and costs incurred in defense of the
litigation. The applicant shall pay such attorneys' fees and costs within 30
days following receipt of invoices from City. Such attorneys' fees and costs shall include
amounts paid to counsel not otherwise employed as City staff and shall include City
Attorney time and overhead costs and other City staff overhead costs and any costs
directly related to the litigation reasonably incurred by City.
10. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees, dedication
requirements, reservation requirements, and other exactions. Pursuant to Government
Code Section 66020(d) (1), these Conditions constitute written notice of a statement of
the amount of such fees, and a description of the dedications, reservations, and other
exactions. You are hereby further notified that the 90-day approval period in which you
may protest these fees, dedications, reservations, and other exactions, pursuant to
Government Code Section 66020(a),has begun. If you fail to file a protest within this 90-
day period complying with all of the requirements of Section 66020, you will be legally
barred from later challenging such exactions.
Resolution No.__ DIR-2016-34 February 23,2017
Page 4
SECTION IV: CONDITIONS ADMINSTERED BY THE BUILDING DEPARTMENT
11. BUILDING PERMIT ISSUANCE
A building permit is required for the alteration to the classrooms and the installation of
the playground structure to guarantee compliance to the 2016 California Building
Codes.
PASSED AND ADOPTED this 23rd day of February, 2017 at a noticed Public Meeting of the
Administrative Hearing Officer of the City of Cupertino, State of California, held by the
Director of Community Development, or his or her designee, pursuant to Cupertino Municipal
Code Section 19.12.120.
ATTEST: APPROVED:
Erick Serrano Benjamin Fu
Associate Planner Asst. Director of Community Development
Christian Light and Salt Foundation
940 S Stelling Road
Cupertino CA, 95129
TEL: (408) 242-2927
Fax: (408) 246-2175
Applicant : Christian Light and Salt Foundation
School Business entity: Christian Light and Salt Foundation DBA Good Shepherd
Christian School
School Name: Good Shepherd Christian School
contact Person: Diane Hsu, Business Consultant , (408) 242-2927
Property Owner: Christian Light and Salt Foundation, 940 S Stelling Road,
Cupertino CA, 95129
School Business Owner: Jane Chiu
Pro_�ect Description:
Use Permit Application : Application for a use permit from the City of Cupertino to
allow a 60-70 medium-sized private school/daycare center(within the multipurpose
room of 213 5 sq. ft. and a Sunday School classroom of 720 sq. ft. ) Our program is
designed for children 2 year to 6 years old. The school operating hour will be 7:00 AM
to 6:00 PM. The school will operate year-round and will be closed on designated holidays.
Pro�ram schedule:
Full time : 7:00 AM to 6:OOPM, Monday to Friday
School Day : 9:00 AM to 3:OOPM, Monday to Friday
Early Bird : 7:3 0 AM to 4:3 0 PM, Monday to Friday
Happy Bear: 8:00 AM to 5:00 PM, Monday to Friday
AM program: 9AM to 11:30 AM
Parkin�: There are 55 regular parking and 2 handicap parking stalls on the site. Which
will accommodate about 357 parking as per city's parking requirement at 6.5 people per
stall.
Pro�ram:
Jr. Preschool (Age 2 to 3.5 years): Consist of 12 to 16 children with a maximum
staff ratio of 1 childcare provider to every 12 children. The children are involved in
many hands-on activities that blend 5 of the major curriculum areas: Practical Life,
Sensorial, Language, Math and Art. For this age our teaching focus on daily life
education, personal care, potty training if need be, language and sensory development,
math concepts, creative arts and crafts, coordination skills, gross and fine motor skills
development , outdoor activities , emotional development, and building grace and
confidence.
Preschool/Pre-Kindergarten/Kindergarten (Ages 2 1/2 -6 years) : The mixed age
Group one consists of 22-24 children from two and half through 6 years of age. The
staff consists of 2 teachers, one lead teacher and two teachers for every 12 students.
Group two consists of 22-24 students. The staff consists of 2 teachers , for every 12
students. The daily program in our preschool environment includes the 8 distinct
curriculum area that are : Practical Life, Sensorial, Language, Math, Science,
Geography, and Art . The goal for this program is to build academic competency
through activities and curriculum that blend individual work time with small group
and larger group proj ects like cooking, science, geography and cultural studies,
Chapel time and outdoor activities.
School Schedule:
The operating hour will be 7 a.m. to 6 p.m. with 5 different drop off and pick up
schedules.
Children will take resting period from 12:30 PM to 3:OOPM for full time students.
Non-nap students will take a 30-minute to 1 hour rest period.
Lunch will be from 11:45 PM to 12:3 0 PM
Playground time (recess) will be 30 minutes per classroom and children will be grouped
and playground schedule will be staggered between 9AM and 11:30 AM in the morning
and 30 minutes per room staggered between 3:OOPM and 5:30 PM in the afternoon.
Drop off time will begin at 7:00 AM and staggered between 7 AM and 9:30 AM
Pick up time will begin at 3:00 PM and staggered between 3:OOPM and 6:OOPM
The peak drop off time will be between 9:OOAM and 10:00 AM
The peak pick up time will be between 5:00 PM and 6:OOPM.
Late pick time : 6:00 PM to 6:30 PM
This is a year round school, with the closure of 11 major holidays and 2 shutdown weeks
1. Between Christmas and New Year(about one and a half weeks) and 2. Spring Break
in April (one week). Occasional evening and weekend uses include: Back to School
Night and Twice a year Open House Events, Seasonal Performance Activities and other
church events.
Circulation stud_y and Parkin�Anal_ysis:
There will be 8-9 parking spaces required during the operating hour for the staff
members
.
The parking stalls available exceeds the City requirement of 6.5 parking stalls per person_
And there are 55 regular parking and 2 handicap parking stalls.
Children will be dropped off and picked up during the time listed list in school schedule
above. Most transportations will leave after drop-off and pick-up.
Noise Anal_ysis:
1. A Noise study will be conducted and submitted if required depending on staff
comments
Children will be using designated playground located on the parcel at designated
schedule (see sample daily class schedules ) and playground layout/area(see play
ground layout)
The school does not have school bells or loudspeakers.
There will be some bus Services for special events such as field trips, 3 to 4 times per
school year (to pick up children for field trips etc.)
Pla_y�round:
1. The site is required by the State of CA Dept. of Social Services to provide a secure and
well-fenced location for children.
2. Children will have direct adult supervision during playground time.
3. Playground will meet the CA State Licensing requirement
Use Permit Justification:
1. The church facility owned by Christian Light and Salt foundation exceeds the
requirement of city and state requirement for private school use. The facility was
designed and built for church and school uses. The plan will attain the obj ective and
purpose of the General Plan of the City of Cupertino by providing quality child care
service and private school for Cupertinoe community at an affordable rate.
2. The proposed site is in a safe neighborhood, a condition the city encourages and
recommends in the city guideline of permitting school facilities. This location is
convenient for working parents to drop off and pick up their children
3. The site is away from industrial area and is close to residential neighborhood- a good
environment for children. The service will benefit working parents who are tying to
sustain their j obs to meet the demands of long working hours.
4. Christian Light and Salt Foundation will also provide child care services for lower
income parents and children who are on government subsidized programs, such as 4C's,
PACE, Choices for Children etc.
5. The program will serve the high child care demand due to the prosperity of the high-
tech industry in Silicon Valley for City of Cupertino. The proposed use will expand child
care availability for the city.
6. Community member's economic health and quality of life are dependent upon our
youth being prepared to take their rightful place as the professional leaders of the future.
7. This project meets and exceeds the City's general plan-goals and policies
Church Current Activities:
1. Monday: off
2. Tuesday- Friday:10am-5pm, staff office hours, location: church office, headcount: 2-3
3. Friday:7pm-10pm, Cupertino Sister Small Group, location: lobby, headcount: 5-6
4. Sunday: 9:OOam-10:30am, worship team practice, location: sanctuary, headcount: 3-5
10:30-11:OOam, prayer meeting, location: sanctuary, headcount: 10-20
11:OOam-12:30pm, worship service and children Sunday School program, location: entire
facility, headcount: 40-60 adults 12-20 children
12:30pm-3:30pm, lunch and fellowship time, location: entire facility, headcount:40-60
adults 12-20 children
3:30pm-9:OOpm, second church worship and fellowship time, location: entire
facility, headcount: 30-50 adults
Prior After school program: (program closed and moved )
Monday-Friday, 1:OOpm-6:30pm, location: entire facility except sanctuary and church
office, headcount: 70-90 children, 5-10 adults
Environmental Consulting Services 18488 Prospect Road —Suite 1, Saratoga, CA 95070
Phone: (408) 257-1045 stanshell99(a�toast.net
September 9, 2016
Mr. Erick Serrano
Associate Planner
City of Cupertino
10300 Torre Avenue
Cu perti no, CA 95014
RE: Noise Impact and Mitigation Study for Good Shepherd Christian Preschool,
940 S. Stelling Road, Cupertino
Dear M r. Serrano,
In response to your request I have evaluated the potential noise impacts that could be produced at
nearby residential receptor locations by the proposed new preschool activities at Good Shepherd Lutheran
Church in Cupertino. The report discusses the present environment, the proposed project and its
associated noise-related aspects, the potential new activities and operational noise impacts at the nearest
receptors in the area, and compliance with Cupertino noise guidelines.
To summarize the conclusions of the report, the proposed changes to the on-site activities would
meet the City noise ordinance limitations and would not produce any significant noise disturbance in the
vicinity of the site.
Project Description [1] [2]
The proposed new preschool activity would provide weekday daytime care for toddler and preschool-
age kids from ages 2 through 6 on the subject church site. This full-day activity would replace the present
afterschool program for school age kids 5 through 12 years old that is onsite from noon to 6 pm on
weekdays during the school year. The preschool proposes to use the same 3 classrooms and the outdoor
play yard as at present, and in addition, an outdoor play structure would be constructed. The site and the
school-related elements are shown in Exhibit 1. There are six-foot wood fences bordering the outdoor play
area on the north and east property lines facing the adjacent residential areas. Temporary parking for drop-
off and pickup of children would use the church parking lot that has 55 regular and 2 handicapped spaces.
School Program [2]
The preschool program would serve 60-70 kids with a staff of 8-9, on a normal workday schedule of
7:00 am to 6:00 pm, Monday through Friday year round. There could be occasional evening or major
holiday activities held on site. The school would be closed on 11 major holidays and would be closed 10
days between Christmas and New Years, and one week in April. There would be 5 different drop-off and
pick-up schedules to spread out arrivals and departures, as follows:
Drop off time will begin at 7:00 AM and staggered between 7 AM and 9:30 AM
Pick up time will begin at 3:00 PM and staggered between 3:OOPM and 6:OOPM
The peak drop off time will be between 9:OOAM and 10:00 AM
The peak pick up time will be between 5:00 PM and 6:OOPM.
Late pick time: 6:00 PM to 6:30 PM
Environmental Consulting Services * * * Saratoga
Good Shepard Christian Preschool Noise Study—Cupertino Page 2 of 5
Playground time (recess)will be 30 minutes per classroom. The playground schedule will be
staggered between 9AM and 11:30 AM in the morning and 30 minutes per room staggered between 3 PM
and 5:30 PM in the afternoon. A new outdoor climbing and play structure appropriate for the 2-6 age group
would be constructed in the existing outdoor play area, as shown in Exhibit 1. There would be at least one
staff person for every 6 infants/toddlers, and one staff person for every 12 preschoolers. The adjacent
Jollyman Park would be used occasionally for special activities, such as nature walks or picnics.
Inside activities would include normal school educational, creative, and play activities in church
classrooms and the multipurpose room.
Sensitive Receptor Locations
The project area is a mixed residential and city park neighborhood on the east side of Jollyman
Avenue in Cupertino, south of McClelland Drive. The nearest sensitive receptor locations for noise
generated by the project includes two single-family dwellings along the east property line. There is a
driveway between the church play area fence on the property line and the garages of both homes, with the
homes on the other side of the garages. The two closest homes across Jollyman Lane are about 100 feet
from the play area and 200 feet from the play structure, with an intervening 6 foot wood fence on the church
property, so they are not considered significant receptors for preschool noise. Other residential receptors in
the area would have less noise due to increased distance and building obstruction.
d�L L�M�III LIII
— — —'— — — �—
�
2
�
�
� � �
c� �
� � �
� > �
._ ._
L N
0 �
, � �
O
� 1 �
i i � � H
� �
� �
� � �
� � �
r
New play structure
Preschool outdoor play area
Jollyman Park i
Noise measurement locations ��t�-����
�111u,i�1f•F-�
Exhibit 1 -Good Shepherd Christian Preschool site plan
This study investigates the extent to which the closest adjacent residences could be impacted by
noise from preschool activities. The existing ambient noise environment and potential noise impacts are
discussed in the following sections.
Environmental Consulting Services * * * Saratoga
Good Shepard Christian Preschool Noise Study—Cupertino Page 3 of 5
Ambient Noise Levels and Noise Sources in the Area
The primary source of ambient noise in the project area is traffic on South Stelling Road, a two-lane
residential street on the west side of the Church site. Typical vehicle passby noise levels are in the 60-70
dBA range at 25 feet. Trucks, buses, motorcycles, and poorly-muffled vehicles produce peak levels 5 to 15
dBA higher on passby. Large and small aircraft and helicopter overflights create infrequent noise incidents
of 55 to 65 dBA. Typical sporadic neighborhood activities are garbage pickup and also residential yard
maintenance. There are no other significant noise sources in the project area.
Field noise measurements were made during the afternoon period of September 1, 2016 with a CEL-
440 Precision Noise Meter and Analyzer, calibrated with a B & K Model 4230 Sound Level Calibrator.
Measurement locations were chosen to represent ambient noise levels adjacent to key receptor locations,
as shown in Exhibit 1 and described below. There was no play yard activity, since the present afterschool
program does not have summer activities.
• Location 1 —in the southeast corner of the play yard and adjacent to one of the adjacent Jollyman
Lane residence garages
• Location 2 -- in the northeast corner of the play yard and adjacent to the other adjacent Jollyman
Lane residence garage
Noise levels were measured and are reported using percentile noise descriptors, as follows: Lg�
(the background noise level exceeded 90 % of the time), L50 (the median noise level exceeded 50% of the
time), L� (the peak level exceeded 1% of the time), and Lea (the average energy-equivalent noise level).
Measured noise levels are presented in Exhibit 2 below. The Ldn noise levels were computed as the long-
term average of the Lea using the daily traffic distribution in the area, with standard weighted penalties for
the nighttime hours, and modeled with an enhanced version of the National Cooperative Highway Research
Board traffic noise model [5].
EXH I BIT 2
AMBIENT NOISE LEVELS (dBA)
Good Shepherd Christian Preschool project area
Receptor location Lg0 �50 �eq �1 �dn
1. southeast corner of play area 44 45 47 54 49
2. northeast corner of play area 41 43 46 56 48
Traffic is the dominant noise source near the project site, with noise levels at any location in the area
depending upon volume, speed and distance to traffic on South Stelling Road. The low noise
measurements reflect the fact that the outdoor play area for the preschool and the sensitive receptor
residences beyond are at least 350 feet from the road, with the several-story tall church building also
shielding the area from traffic noise.
Relevant Cupertino Noise Ordinance Limits [3]
Section 10.48.040 of the Cupertino Noise Ordinance is applicable to this project, which limits noise
during daytime hours (7 am to 8 pm) on residential property to 55 dBA, and 50 dBA during evening hours
(8pm to 7am). In addition, brief daytime noise incidents are allowed with somewhat higher noise levels by
Ordinance section 10.48.050. For example, noise incidents that last less than 15 minutes during any two
hour period are allowed to be 5 dB higher than the long-term general limits.
Environmental Consulting Services * * * Saratoga
Good Shepard Christian Preschool Noise Study—Cupertino Page 4 of 5
Potential Christian Preschool Noise Impacts
Outdoor playground activities
Most outdoor activities would occur in the existing play area behind the church building, as shown in
Exhibit 1. This is a mostly bare dirt area with some foliage and trees, which has been used in the existing
after-school program. The only changes to be made would be the installation of a children's play structure,
with a poured-in-place smooth rubberized ground cover around it. Several types of play activities would be
included in the back yard area for the post-toddler kids, including climbing structure play, use of tricycles
and other plastic riding toys, group games, games with balls, and other appropriate outdoor play activities.
Playground time (recess)will be 30 minutes for each of the three classrooms, 16 to 24 kids at a time.
The playground schedule for each class will be 30 minutes at different times between 9AM and 11:30 AM in
the morning and 30 minutes per class at different times between 3 PM and 5:30 PM in the afternoon. Each
play period would be supervised by one or two adults, as appropriate.
All of the project noise would be from sporadic voices of the young kids and staff during outdoor play
periods. Activities of this type can create intermittent brief noise from voices of 50 to 60 dBA at a distance of
30-40 feet within the play yard. The closest adjacent residence is approximately40 feet from the play yard,
with two 6-foot wood fences intervening. The other residence is 60 feet from the play yard. In both cases
the garage is between the play yard and the house. Distance and the property line wood fences reduce the
play yard noise at each residence by 12 to 13 dBA. The expected worst-case noise levels in the nearest
residential yards from outdoor play activities are shown in Exhibit 2.
EXH I BIT 2
PROJECT NOISE LEVELS (dBA)
Good Shepherd Cristian School, Cupertino
Receptor location Max Yard Noise
Levels
1. adjacent Jollyman Lane residence-south 43-48
2. adjacent Jollyman Lane residence- north 45-50
Noise levels from voices during outdoor play periods would be noticeable in the adjacent residential
yards, but would be much below the 55 dBA City noise ordinance limits, and would not be considered
disturbing with existing normal daytime noise levels. The project adds three new morning play periods of 30
minutes, causing sporadic noise levels above the ambient in residential yards, which would increase the
morning Leq by 2 dB or less, and so would have less than one dB impact on the present 24-hr Ldn less than
50 d BA.
Note that project parking lot noise generated by school-related trips would be similar to parking lot
trips for previous uses at the location, and would be less than noise from traffic on S. Stelling Road.
Project Traffic Noise [4] [5]
Because of relatively high traffic volumes on S. Stelling Road, in the range of 9,000 trips per day, the
new trips generated by the Preschool program, approximately 70 trips over a couple hours in the morning
and 70 trips over a couple hours in the afternoon, would produce less than a 10% increase in traffic on
Stelling Road, which would produce much less than a 1 dB change in the traffic noise level at residences on
Stelling Road.
Temporary Construction Noise
The only construction associated with the Preschool would be the construction of the play structure
next to the church building (see Exhibit 1), and the pouring of a rubberized play surface under and around it.
This could create several days of sporadic noise from small motorized equipment and small tool
construction activity, in the range of 60-70 dBA at 50 feet, which could create intermittent noise levels in this
range for residences on adjacent properties.
Environmental Consulting Services * * * Saratoga
Good Shepard Christian Preschool Noise Study—Cupertino Page 5 of 5
Conclusions and Summary
Overall ambient noise levels in the project area now depend primarily on traffic noise, and this will
continue to be the dominant noise source in the area in the foreseeable future. The primary noticeable
noise would be intermittent and brief voice incidents from young children playing in the area behind the
Church building. With the informal type of play activities, the age of the kids, and the distances and/or fence
protection involved, these activities would be within City noise ordinance limits, and would not create any
noise impacts in the adjacent residential areas. Thus the new preschool use, adding new morning outdoor
playtimes, would not create any noticeable noise impact and would result in a"Less than Significant" noise
impact on any nearby properties
If I may be of further assistance on this project, please do not hesitate to contact me.
Respectfully submitted,
H. Stanton Shelly
Acoustical Consultant
Board Certified Member(1982)
Institute of Noise Control Engineering
REFERENCES
1. Project drawings A1.1 and A1.2, Good Shepherd Christian School, RCUSA Corp, San Jose, CA; July
2016,
2. Project description and preschool schedules, Diane Hsu, Consultant, Christian Light and Salt
Foundation, 940 S. Stelling Road, Cupertino; August 2016.
3. Noise Ordinance, Municipal Code Section 10.48, Noise levels for residential and commercial zones; City
of Cupertino. .
4. Cupertino ADT Traffic Volumes, Public Works, Oct 2013.
5. Highway Noise-A Design Guide for Highway Engineers, National Cooperative Highway Research
Program Report 117, Highway Research Board, National Academy of Sciences, Washington, D.C.,
1971 (model enhanced and field validated by ECS).
Environmental Consulting Services * * * Saratoga
Good Shepherd Preschool Noise Appendix Page A 1
Appendix Contents
Environmental Noise Concepts and Definitions A 1
The Impacts of Noise on People A 2
Typical Noise Levels and Effects A 4
Environmental Noise Measurement and Analysis Procedures A 5
----------------
Environmental Noise Concepts and Definitions
Sound is the rapid fluctuation of air pressure higher and lower than normal atmospheric pressure. The term
noise is used to mean unwanted or undesirable sound, but this a very subjective matter depending upon the
individual; the terms noise and sound are often considered interchangeable in normal usage. The frequency of
the sound, or pitch if it has a dominant pure tone, is the number of fluctuations of air pressure each second. If
the sound frequency is within a range of roughly 50 to 15,000 cycles per second (Hertz), it is audible to persons
with normal hearing. Another characteristic of sound is its loudness, usually measured and reported in decibels
(dB), a shorthand logarithmic unit that avoids having to deal in the very large numbers describing the range of
sound levels in its basic engineering units. Examples of common noise sources and their sound levels are found
on Page A 4.
The basic issues in dealing with the community and environmental noise are its effects and the way it is
perceived by most persons (see the Effects section, Page A 2). Therefore, the noise must be measured or
modeled, and then compared to guidelines, regulations, and known effects. For these purposes the decibel is
used with "A-weighting", meaning that the lower and higher frequencies are de-emphasized to match the
sensitivity of human hearing at different frequencies, as opposed to a "flat" frequency response in which all
frequencies are equal. Unless otherwise stated, all references to decibels relative to human effects and
community impacts are in "A-weighted" decibels, or dBA, in the usual abbreviated form. These decibel values
are then referred to as noise levels, or sound levels. The equipment used to measure noise levels is called a
sound level meter.
In spite of the tendency to describe environmental noise levels with single-number descriptors for
simplicity, the most characteristic feature of noise that people experience in their communities is its extreme
variability. So to better understand what a particular noise environment is really like, more than one descriptor is
generally used to describe its variability. For example, the average noise level may be accompanied by the
maximum or highest noise level, and also the minimum noise level occurring during a particular time period. For
example, in some cases it would be more important to know that the minimum noise level is 45 dBA and the
maximum noise level is 90 dBA, than that the average noise level is 55 dBA.
There are literally dozens of different types of noise environment descriptors, each developed to give
information on the effect of a specific type of noise under certain conditions--such as for aircraft noise, for speech
intelligibility, or for hearing impairment. In recent years governmental agencies have been standardizing on the
use of Ln, Lea, or Ldn. Ln, where n is a number in percent, refers to the noise level exceeded n percent of the
time. For example, traffic noise may be generated along a freeway such that at a distance of 100 feet from the
roadway the noise level is 70 dB or higher ten percent of the time. Hence its L�p noise level is reported as 70
dBA. The L50, or median noise level, is also often used as a noise descriptor. The Lea also often is used, since
it reflects the single noise level that has the same energy as the varying noise environment, and reflects more
accurately the impact of high noise incidents. Ldn is a 24-hour Lea computation with a 10-dB "penalty" during
the 10 p.m. to 7 am time period, when a quieter environment is expected. In other words, a location with a 55
dBA daytime Lea would have a 55 dBA Ldn if the noise level dropped to 45 dB during the night time hours. The
Environmental Consulting Services * * * Saratoga
Good Shepherd Preschool Noise Appendix Page A 2
State of California and many local agencies use the CNEL, which is nearly the same as Ldn with an additional 5
dB "penalty" from 7 pm to 10 pm. In normal community environments, Ldn and CNEL are nearly the same. The
equipment for measuring statistical noise descriptors is called a Noise Level Analyzer.
The "ambient" noise level refers to the combination of all sources of noise at a given location. The
"background" noise is similar, but refers to the combination of distant sources that determines the minimum
sound levels in any location. The Lgp or Lgg statistical descriptors often are used as a measure of the
background noise level.
To more readily understand and compare differences in noise levels from one location to another, equal
noise contours are often developed for a given site. Most often L�� or Ldn noise level contours are used, joining
locations on a site that have the same noise level, in 5 or 10 dB increments. Noise contour maps are similar to
plotting equal elevations on a topographic contour map.
Several concepts are particularly important in discussing what to do about unwanted noise mitigation,
reduction and attenuation; the terms have the same meaning in general usage--to lower noise levels in a
receptor area. Reflection is one common noise reduction method, which diverts sound energy from a location of
high impact to an area of less impact, such as when using a noise barrier. Noise absorption is a mechanism by
which some materials, such as thick foliage outdoors or fiberglass batts used as insulation, absorb sound energy
and thus reduce its impact.
Mathematical noise models are often used in projecting noise levels that cannot be directly measured,
such as in the case of future traffic or airport conditions. Noise models use previously-measured and analyzed
relationships between noise source characteristics and physical and geometric conditions to compute future
noise levels with relatively good accuracy. A number of models for projecting aircraft noise, roadway traffic noise
and railroad noise have been developed and are in widespread use.
The Impacts of Noise on People
Noise is a part of our modern society noise from motorized laborsaving devices, transportation sources,
and recreation devices. The use or conversion of energy for any purpose is seldom accomplished silently.
Humans typically have a capacity to tolerate or ignore a certain amount of noise in the environment. But adverse
effects are present in many exposures to noise, and dangers to health other than outright hearing impairment
also are recognized.
The problem of controlling noise is difficult because it affects each individual differently. People do not
hear sounds similarly, hence they do not react to sound in the same way. First of all, each person's reaction to
noise depends upon the characteristics of the noise itself:
• loudness
• frequency
• duration
• ti me of occu rrence
• unfamiliarity or uniqueness
But the effect of a noise on people also depends upon the situation:
• background or ambient noise level
• individual sensitivity to noise intrusion
• activity or preoccupation of listener
• perceived need or justification for noise
The factors that determine how much a person is disturbed by a noise include physiological effects,
psychological/emotional effects, and activity interference.
Environmental Consulting Services * * * Saratoga
Good Shepherd Preschool Noise Appendix Page A 3
To better understand the use of the decibel as a measure of relative loudness, a list of common noise
sources and their approximate sound levels are given on Page A 4.
Recognizing Noise Level Changes
When a noise environment or a noise level changes, typical responses to it are as follows:
• A change of 1 dBA is not noticeable
• A change of 3 dBA typically is heard
• A change of 5 dbA is very noticeable and can be intrusive
• A change of 10 dBA is a substantial and disturbing change (representing a doubling of the
loudness)
Note that combining noise from two sources with the same noise level, because of the logrithmic
nature of the decibel, increases the combined noise level by 3 dB. So adding two 50 dB sources
results in a combined noise level of 53 dB.
Physiological Noise Effects
At relatively high noise levels above 80 dBA, the delicate internal ear mechanism can be altered to cause
Temporary Threshold Shift (TTS), resulting in partial deafness for a period of a few minutes to a few weeks,
depending upon the noise level and the exposure duration. If these excessive levels over 80 dBA are continued
over long periods of time (for example, eight hours a day for several years), or very high levels (over 100 dB) are
experienced for shorter periods, Permanent Threshold Shift(PTS) may occur. PTS is an irreversible loss in
normal hearing capacity.
Fortunately, few exposures to levels causing hearing damage occur in the typical community noise
environment. However, some problems can be experienced by those attending or participating in regular
musical and recreational events with high noise environments, or by those engaged in occupations involving high
workplace noise levels, regulated by State and Federal Occupational Safety and Health codes. The potential for
other less damaging, but nonetheless disturbing, noise effects exists throughout our normal daily schedules--at
home, school, shopping center, park, or highway. These noise impacts can cause subtle physical, mental and
emotional stresses of varying degrees of seriousness.
Activity Interference
Noise can disrupt human activities such as sleep, conversation, or stereo and TV enjoyment. Studies
have shown that noise not only can prevent sleep because of its intensity or characteristics, but also can
seriously disturb the quality of sleep without waking the sleeper. Conditions such as these, community noise
causing bedroom noise levels between 35 and 50 dBA, are encountered to some extent in many urbanized
areas, particularly near high volume traffic or airports. At interior noise levels over 55 dBA, all types of normal
speaking and listening activities are disrupted. Speech intelligibility drops sharply, music listening and TV
watching become strained, and aural communications must be carried out at much higher volumes to be
successful. Obviously, shouting to be heard and understood is both undesirable and unpleasant for all
concerned.
Psychological and Emotional Impacts
Less well-documented and understood, but probably more widely experienced, are those impact of noise
that cause such subtle effects as distraction, annoyance, startle, privacy interruption, stress and tension. These
effects as a class can, if continued, cause very serious emotional and psychological anxieties and disturbances.
Often the increased irritability and tenseness are not directly attributed to the noise environment, as the listener
may not be consciously aware of the noise intrusion. Our human ability to "tolerate" and "adapt to"disturbing
noise levels thus can adversely affect our subconscious body processes. Protection against the intrusion of
Environmental Consulting Services * * * Saratoga
Good Shepherd Preschool Noise Appendix Page A 4
disturbing noise is particularly important to mental and emotional health in an active and complex urban
community.
Environmental Consulting Services * * * Saratoga
Good Shepherd Preschool Noise Appendix Page A 5
Typical Noise Levels and Effects
Noise Sources Noise Level (dBA) Human Response or Impact
Jet aircraft takeoff(100') 130
Auto horn (3') �120 Threshold of pain
Rock music in a club 110 Deafening
Motorcycle accelerating, no �100 Very loud
muffler (25')
Motorcycle accelerating, 90 Intrusive
stock muffler (25')
Food blender (3') 80 Very disturbing to most
Power lawn mower 20' activities
� )
Steady urban traffic (25') 70 Communications difficult
Normal conversation (3') 60
Daytime street, distant traffic 50 Sleep disturbance
Q u i et off i ce 40
Inside quiet home. 30 Very quiet
Soft whisper (10')
Movie or recording studio 20 Seldom-experienced ambient
�10 Barely audible to good
hearing
Threshold of hearing 0
Environmental Consulting Services * * * Saratoga
Good Shepherd Preschool Noise Appendix Page A 6
Environmental Noise Measurement and Analysis Procedures
1. Select monitoring sites representative of worst-case sensitive receptor areas, topography, noise
sources, and noise transmission characteristics.
2. Perform field noise measurements of long-term statistical variation in the project area and, if appropriate
for project traffic, on access routes to the project, 20-30 minutes in each location. Record key statistical
descriptors, including LgO� �50� �10� L�, and Lea.
Equipment:
Precision Sound Level Meter and Analyzer, CEL Model 440
Sound Level Calibrator, Bruel and Kjaer Model 4230
3. Record noise levels for significant individual sources and incidents in the project area.
4. Compute Ldn/CNEL values based on field measurements and traffic noise model based on traffic
volume variation throughout the day. Without specific hourly traffic count data, use typical commute-
based daily volumes as follows for the daily traffic modeling:
Period Hours Hourly Vol
(%ADT)
A. 7 a.m. 9 a.m. 2 7.5
B. 9 a.m. 4 p.m. 7 5.6
C. 4 p.m. 7 p.m. (no peak) 2 7.0
D. 7 p.m. 10 p.m. 3 4.0
E. 10 p.m. Midnight 2 2.5
F. Midnight 7 a.m. 7 0.7
G. Peak Hour 1 10.0
Environmental Consulting Services * * * Saratoga
�
�
� � ' �
�� � � �':
A����������1�� � � 1�
� r�un urn � ure n� � a ' �n �
�
� pnd �',S� Full 5ize S South
� z � �
L M le P'7 Foot or Feet SG So1id Core � �
� �;t�;�e �. F���m�, �� Schedu ev�����5� a t G o o d S h e p h e rd C h r i s t i a n C h u rc h � o ��
; Dtomefer or Round FUT. Future SCN. Screen
1 Perpend'iculnr SD Soop D'ispenser (x"j � �...
Pound or�urnber SEC7: 5ectlon
�� Existing � Gouge �T Shee�Shelrng 9 4 0 S. S t e I I i n g R o a d, C u e rt i n o, C A � � �
c�►tv c�+��Zea �
A.B. Mchor 8otts G,B. Grob 8ar �
ABV Above G,G Cenerd Controct{or) g�TM, �,�thing $
A,C. Asphaltic concrets �p. Grode{ing) v `�
ACOUS Acoustical GL Gloss � Similor O �
A/C Air Conditroning GND. Ground SN.D. Sanitory.Nopkin pispenser j
A.D. Areo Oroin GYP. Gypsum S�R Sonitary Nopkin Receptacle r/1 a ��i
AfF: Above Finished Ftoor StdT. Seolont �/
/1DJ. Ad�stable N.& Hoss Btbb SPEC. Specificotion(s) V1
ADJA. AdJoCent HBD Hordboord � Squore � r"'+ �
A�. Aggregote HDW Hordy�are � Stutnitss Steel
ALT. Altemote H.M. HolloW Metol �• Service 5nk � �
ALUMI. AlumTnum HOR. Horizintal STA. Stotton r l
AN00. Anodized HR. Hour 37D• Standord v � �j
ApPROX. Approximote HT Helght 371- Stee1
ARCH, Architect(ure)(urol) HWD HordV�ood S1�R. Storage
ASPH. Asphalt H.V.A.C. Heatfng/Venttloting/ � Structure(ol)
Air Condittontng ��• Suspended S C O P E O F W�R K■ €�T��•5�s'��' ����s��
BD. Boord YrT� ■ �e�a g�$��" ��a�����
SYM. S metrical �0'6.� a� c g, i^�
Bp, Belo�r �,p, Instde Diometer �• Synthetic �s ° � , E ,•.s
BET. BetV�een IN�. Insulation ��Y���'� s g '�"
811UY. ettumtnous T. Treod 9. INSTALL NEW PLAYGROUND FURNIIURE. ��`�g �`��'����rb
9L,pG, Building INT. Interior j,B, To�ke1 Bar
BLK. Bloek ej�o ��s �`��� �s`:
JAN. Jonitar � Te eahonet� �B�°����g�B�` �s �
BLKG, eloeking ,(r Joint � T g
81A. Beom Td�t'a Tongue and Groove
B.M. Bench�lark pT Kitchen
1HK Thick YEb='6p��S��[=a���ieE�
BRC. 8eoring 1HR Threshold �p
BRZ Bronze T.P.D. Toilet Poper Dispenser .�}�`' �
BOT Bottom �• Loborotory 7pTM Tollet Pordtton �
B.S 8oth Stdes �• Lominate T.Y. television -Ci+
B.W. Both�yoys uV Lovotory T.O.C. Top Of Curb '4�
LBL Lebd T.OP. T
BUR 8ult Up Roofing op OF Poyement
LI(R. Locker T.O.W. Top OF�lyoll /�
CAB. Cabtnet LT Light np, Typicol u
C.B. Catch Bosfn �i�- Lintel � Terrazzo
�jt,��f�
CEI�A. Cement LVR. louver 5'lf-q�{Q�IG TSAI C-24234
CER. Ceromlc IRdF. Unfinished
C.I. Cost Iron M(m) Meter U.QN./ Unless Othery�ise Noted
CJG Control Jotnt �� Mosonry U.N.O. �
CK. Coulk(ing) �� Moximum � �
CLQ Celling MBR. Member VERT. Verticol �
CLO. Closet �� Medicina Cobinet �� Vestibule �
«.�. C1eOf ta�Ge, � Me bra'nce w �est G E N E RA L N OT E S B L D G DATA S H E E T I N D EX � � a
CM(Cm) CentTmeter yg'�'�'n, Iyfetol W� �yith � � V
C.M.U. Concrete Masonry Unit W.C. YVater Closet
MFR. Monutoctu►e(r)
a�m. co��c� �, M,,,no,e w/o N�ctia,c Ao.1 T1TLE SHEET „♦, � o
COL Column wp, Wood 1. CONTRACTOR SHALL VERIFY EX15i1NG CONDITION ON 5�1E.NOTIFY ARCHITECT FLOOR AREA: � � �
A�W. Mtnun
COIrP. Composite(tion) �� �ino� Wp. �foterproof �M�EDIATELY 1F THERE ARE ANY DISCREPANCY OR INCONSISTENCIES FOUND. T.I. FLOOR AREA' — S.F. ■�
COPIC. Conerete WSCT. N/olnscot ' � }� �
CONN. Co�nectlon �� M�scelloneous � wB19ht 2, CHANGES IN DESIGN OR I�ATERIALS WILL NdT BE ACCEPTED WI7HOU7 � y �
MA1(mm)Mi��meter YyRITTEN AUTHORIZATION�OM ARCHITECT/OWNER. APN� 359-25-041 ARCHITECTURAL Q
t:CNST. Construction ■�
M.0. Mosonry Opening Q� L
CONT. Continuous �
MI.D. Mouldin 3. ALL WARRANTIES DUE TO OWNER SHALL BE FORy�IARDED�N TR�PUCATE FORM L
CORR. Corridor M1D. Mounted TO GENERAL CONTRACTOR/OWNER UPON COMPI.ETION OF THE JOB WITH NO A1.'I SI1E PLAN � V
C1R Center M1L Moteriol EXCEPTION•fAILURE TO CO�PLY Yy1TH�IyILL RESUL7 IN DELAY IN PAYIyIENT OCCUPANCY: AZ�B �
� M���t� ro suecowrnacro�. BUILDING 1YPE: V—B A1.2 PLAY GROUND PLAN & DETAILS = V 'a
�wu. Mfll�york PLAN SECTIONS =
4, CENERAL CONTRACTOR SHALL SUBM�T ONE SET AS-BUILT DRAIJyINGS�N CADD STORY(IES): ONE L � �
DBL Double FOR�IA7 TO ARCHITECT AND OWNER UPON COMPLETION.
DEP7: oepo�tme�t FlRE SPRINKLE: YES (EX{S11NG� � �
DE1AA0. Demolish,Demolitton N North .•�a'� CONCRETE 5. MODIFICATION OF EXISTING FIRE SPRINKLER SYSTEM TO BE DESIGN/BUILD BY � � �
D.F. DrTnking Pountoin N.LC. Not In Controct � GENERAL CONIRACTOR,DRA�MINGS�iALL BE SUBMITTED TO FIRE � _
OIA. Dfometer N0.�� Number �i��!!%i77TJTf CONCRETE BLOCK DEPARTMEN7 FOR REV�EW AND APPROVAL. DESIGN COMPLY WITH : � �
DUQ Dlogonol NWrI. Nominol �
DIA1. Oimension(s) N.T.S Not To Scole :%�ir�J/ �ETAL STUDS CBC 2013 Ed. � � Q�
DISP. Dlspenser
DWT. oemountobie 0/ ove� CFC 2013 Ed. O (f� N
DN. DoWn O.A. Over All 1NOOD SiUDS
D.O. 000r Opening pBS, obscure CMC 2013 Ed.
DR Door QQ On Center � SOUND INSU.PTN. � � �
DWR. DroWer O.D. Outstde Diometer CPC 2013 Ed. � Q O
DS oow�gPo�t o�, ore�e CEC 2013 Ed. � � �
D.S.P. Dry Stand Pipe OPG, Opening
D71. Detan opH. Opposite Hond 2013 BUILDIN6 ENERGY EFFIC�NCY STANDARD �
DWG DroWing(s) OPp. Opposite .F,r
2013 CIWFORNIA qiEEN BUILDING CODE
E Eost PCG. Pre-Cast Concrete �
EA. Eoeh PFB. PreFobricote(d) CITY OF CUPER11N0 CIIY ORDINANCE
Ee. Ezponsion emt P�. Preflinished DETAIL SECTIONS
Ed ExpansTan Joint PK. Porking
E1. Elevotion PL Plate
p.EQ Electrieol P.W�A Plastic Lominote
p.EV. Elevotor PLAS Ploster ri...-�,;-�o CONCRETE T TLE S E
EMIER, Emergoncy PNT. Palnt(ed)
ENC6. Enelosure PR. Pair � FlNISHED�y00D `,
E.P. Electricol Panelboord PT. Potnt �'�'�'� T ��� SY M B O L S
EQ. Equo1 P.T.D. Poper To�yel Dispenser �
EQPT. Equipment P.T.R. Poper To�yel Reeeptacle ��� PLYVy00D �
DA�: 07/07 16
E.W.C. Electric�lyater Cooler PTN. Portition _
RIGID 11`ISULAi101� f�;A7�r�dlt✓ +�n a.�r�e,t<�
D(G. Existing PWD. Plyy�ood P�t7t r x rF{.3�e !�.,�i JOB N0.R�6�73�J
p0+0. Exposed PV. Pove(in9)(ed) � 3 A ��pR�E lSSUE A[REVISIOtd
D�, ExponsTon P.KQ Polyvinyl Chloride B�ANKET Wsu�AnoN 'r����.���a�„<ul.artS''�
E)(T „ ' " � - "� z ,,._
, Exterior
t<<rc:��,�1,�� �33itCr�z�r L,;c.� ,� 1���,�, ��:�a_,,.�. 'rah��
Q.T. Quorry Tile � ACOUSitCAL TILE {a i �i; r.-, :�: ��K
F.A. Fire Alorm ^ SECl10N REFQtENCE N0. _ _
F.& Fbt Bor R Riser GYPSUM BOARD '='- 99 �1 �
F.D. Floor Droin RAD. Radtus � �'y�������'�"''� -' `f� X$
.:•;• . ..::. ., � � t;�:;(.�;u..,* . SEC7:REF SHEET NO. 2
F.E FGe Exttnguisher RB. Rubber Bose = r� ' -' 3
F.EC. Flre Extingufsher Cabinet R.D. Roof Droin ���r �1ETAL r'- ���tHg,>,
FFE Ftnished Floor Elevotion REF. Reference �— � ELEVATION REFERBVCE N0. 4
Ff1. Finished Floor Line REFR. Refrigerotor •':._ .•• . • PLASTER ; ' ';"s'': .,.zt E�E' 99 5
F.H.G Fire Hose Cabinet REG. Register �':t t':ft=s`.�<', X-9���.� �Na
Ft�t. Ftnfshed ROI� RefnForced(Tng) !%%%i�i�!��/ �ASONRY 8
�, Floor REQ Required U;� �>: 7
FL�'r. Floshing RES. Resflient �SS _ �4 sr°�-_:i
FLUR. Ffuorseent REV. Revision(s),Revised F�t�-t�r �� " 99 �—���'��� 8
���'�'�f y��5�.�'d.�.GtS��'3�i'�c�lf8 �i�4c^sCi
FNp, Foundotion R►t. Room �
F.O.G Foce OF Concrete R.R Rough Opening � E�T� " ,� X-9 p���_���p. S
F.O.F. Foce Of Finish RWD. Red�400d �' f ��
F.O.S. Foce Of Studs R,MbC, Rotn woter Conductor �> 11
Fp, Ftreproof RYILL Roin Water Leoder
� REVkSl�1 SHEET NR
t=_ -
�;�ff:.;:2"�i . . . � . '���� �O� ■
Yii
���g� �
� �z
�b
�
��
� � � �
� O n r�
� � ��
V � vv
� � �
�
� �
� � ��
� � �
� O �
JOLLYMAN LN � U ��
��� �� �� �� �� e� �� � �� �� � �� ������ �� �� �^ �� �� u�o �=��a6� z�§eI�
/' ��Tae.�'ns'�� F��Y����
� ��6 ��s��� �� � ���
�8 � @a .�:�
a ' � ��6E���n����gz s�g��gs
30'-5 89'-6� � b"� £�a����`��s6s�s
M $������a� <��� �
s�SxE�������=s�€��s`�
1
1 �
(N)6 FT REDVVOOD FENCE dt GATE 1 5E�
I � '�
�� -CH
� WALL LEGEND 423`
�mn�
I __ `�'� ���
PROPERIY UNE �i'�.�F�
I (N�ENCE�iryE SY—CHENG 75A1 C-24234
4 -a--�--o---(E)FENCE � s
o v
L
OUTDOOR SPACE 12,296 SQ FT �r � Q
I � U (.�
� O
._o � � �
I � � (E)TREE AND LANDSCAPE TO REMAIN, �
� �
o N �
� ^` '� C.
� ' � (E)6 FP REDy�00D FENCE � ^ U
� i
' ^ ����v������������ ^ o ••F� � �
� � �� -a c�
� � � � � E- -� 3,•-,0- 50�-�- " (N) P LAYG ROU N D � � �°
� FURNITURE LOCATION.
'o • ` 1.1.. t �
� � SEE A1.2 � a�i '�
I 1 � �•-r ss-a- � t �-'
0 0 • 1 (� tA
� PA G 1 I I � � O
t/!� ________ ________ � � � 'a N
� --— —--
(�CAST IRGN F'Et�CE � T T s• w � O �I"
� k , 8M O
i 8' � � �
� N �r- �
� .� ss o` _ � Q
I M
� � •_'O �
p�� �
I h+ • N
1 12� , �
' ` N SITE PLAN
• � N
��� � � � � � � I N O O
�� �� � � �� � ��O O M M O O
(E)4 F7 1`IETAL WfRE QIE�i FENCE k GATE 33�—Z�
DA�: Q7/O7/16
(E}6 FT 1AETAL WIRE MESH FEAlCE
,as No.RC160735
52°-4" 20'-4" i T-0"
U P G RA D E (E) (N)4 FT REDW�FENCE�GATE WIiH lA� ISSUE dc REVISION
ACCESSIBLE PARKING AND � - ��
DETECTABLE WARNING PAD. 2
�g 4
SEE A1.1 5
SITE PLAN B
SCALE: 1/t6'e 1'-0' 7
8
9
10
ft
SHEET NO.
A1 .0
DRAWl1 BY: YC
�d
��AflR ACGSSB1Yf�T�JJII't�LGE-hitAAti f(1PifflHMFo1G£
APP�E�E�D�VIQN J�SS�RI � ; FC�A KaUS \ � \ � h�i
�amsm ece�se�evaea�u�s�maa,� rms ��;C i�:rc! :,.G£5 ���y
-----_.�.-�—'---
TO?bilE�N __;__ srt ' o „ 'f ,:r ��
- - ' '; 2.5 O ,i%
GENfRAi AtOT£5: \
�df 'n7::cc,strw;p:r.%.aa.•� O � �
� m iotrn+eiea PyudtA 9in� o � ��
S�s Sa�Nr1.�:M 4.III1s9'X.s
x`am'a:.,.o:43'vq:'✓_ �
a�u�,g.:�:war.�.�em.-�a. ��9— �79 V O MNf M
�� :
+.x:e.,m,��:.M,�
� q fmil�x:1•iy_"r�aA��• � /� � ���
E+me .-.t%�S+P7. I � i� ��
; rang�iW:.^ilsmsioon:
��\ ? ( aM�:A31ny.air.vm. _' ru�
� ��� 3{ �1S7a9CG:.Y.c:�3i.�n��ry � � V I�1 vv
� f { � wrhnM rwa:air.yrircd
l �
� � 3 � Le ,na raw rx �J` �
LJ ` . .
�q�vrnm:sw na:a ntc�f z 4.
6T ILiC �5%4va:,s ffsA:�a�n7
� L�r(Dn.tfefrtivtigl,st \ / O
v3k pa2A thi
j aqtipnc_Fxin t•th:C�_S w
TIS6}W � � yq• F��» 1'Ll tn�bmiFuA.�i4c �
`/
StA80t1 3 b RmI ➢1>i9nssrA'retf.5ectan4: �€ O �
�
" �� — �M �rf�� ° ° � P LAYG RO U N D P LA N � � �„
�o, �r; � �R \
e'° �,�-" �n S C A L E: 1/4'�1'—0' � �I c�
�S r� . 48' � '^-a� `/ O
c�; �
rum T--�- �,/ � � � sc � '�`soetan
� , ����}� � s�.. � Pxt
���g�� * _ -� � 6, ,� I-�i � ��
GaAMr � ' " $g � � 4�
g _ g � ��o �$��6a � #�SE�
�,�, �r-.'G s`�s.�3 F�xr��>-
,-�, �€o������� d o�'e�,��
� §� � �ti.; D�c
\/ �E �nSl�^� P.'a3f���5
\ � / ��'��$���€�C�<����sa�
/ s � 8. - s 6-�
TMa� �3���;� �� �s �
ssae
18' 7" z�sR�g�������z����B
STRUCTURE�:R35A7587:, � ��
PROIECf€:NSPiG86A38A-J P�Y«��p .. PLAYCRAFT � 17 — 9 �.�s�° ��.
DATE 6,3/2016 �GRAWN BV:MDM MIN.USE ZONE 36'x 34' K�auss Craft,Inc. �c� ^ I
`VI -CHE u
-aZSt
� 2 6� ��� �,�����
„ oF�,,,F
ApAAtCFSSOLRV.UOQ@!f AD11AGfANiOMtN1[F
APPLE SEED MONTESSORI coR Kios �
flEtlAT�ACCESSBIE PAMVACCESSBLE WOVND TYPES �'J 7�� �- �GES SY—CHENG TSAI Ct�I4Y�
SITE PLAN _v- —sis__.___.o__..�_.l�_.2� i-=,; ^^ � _
�� zs � l '+
GENERAL NOTES: v
�, l5,9" TM:c�.:�m,.y.,�e vi.,�rs \ O
;,K__.____________________.__.......___......_..._.......__....__...__.._.. ._____.____'.______._'._____'____-_� •�
; t�,�ea�m.�:�Rm.�c.�r �}i ^
- ---:�.-`----....-------"----�--�---.————� m��atr•whr eaa�,mw�in. � O �
� / � �— » i Q
/ 6FT � :�:n�,��oo�r.c•u�n.,:o�a«. � V
Kra�s C�aF.,Inc+:anMbe �
I���t��[\��U�'i� \`1 hetl�e�:.on�iolefe.a
-� S�iDE � ( �������.<�b•�•�»,� E GARAGE STOR � � �
. ��„���mi d,mm„��, -�—+
� ZoraE i � ,�b�.:�re��o�,�.�;� C
/ I an�K. v} �
+ 1 ^ ■� �
�r ';� �netn���m„mu:c:rnett.s � i� ��..�
/ � I q.r:r�:c.��.b.:.eo�.a� �. � N Q�
/ i i �f � w�o«a.,o�emTarcor �
� � I �—_ e vn.�.��o�e. �e � � •/�. �
�
t.- � � 5v,,.,o� � L
';! ��; � �r. ��sNaeo�n.�..m:nm.y L� i V
:� j � aion a��:�ore.rn.«m,�.
beow:vrzprtirg he�rte...x � I
� � ���• +�n9'necomm�ndoGa:vng �
��,',� F fn:iG "v.gsfr.mllrcfiecry }� �
S `lA�. 5.T � �„w.e:�,r:,.e<o.e�,:. •� �
i 1 — - fN!NI�v1UA�7 `y�aa:m���_�„a-aneK
i l o . _ �i'�".'�;\ USE ` �>:<m.eHrne�.�. ^
; � 4:"£�i�-�.e:`+;: ZONE � � � 0
36'-OtlJ' \ 6 FT J; � �aw�s^t=_�,, + yYGGl.li6:pcce�sb:eas[<ly (
r�i rvm���rta '' ; ; .�.. ��:�m��n�,,,�q�,«a \ �
" , a�.,�.�a���.�r� N � a�
'. �.,;, . , .. � }��
� uLI�C � 3.. \ ... .ywN..���m,i��..,�Qa�t
l L�n'E 5:�'3��p�� \� t gM.alue6ailaei3M1 � t/^\`� � � V/
acGrcPni�et�N�h:ghest � ` `1 \I
�y .� ^ � � �
i '"'s,j'3 i�!'�`i ;', /�/ .<.�i�r �tm:, �
���J"' eqvip.ner.t P.�fe�h tl.e CW'Ci' � ,^`I
� ' i��.J �, N,aeootr�,o�:n�c ` V ^ � ^ •Q�
♦\ t�-l.� ti ��o,y.as,e.ry,s�wo�n: I 3 3� — ��� O � i� �
-� \'' � w f A (n
��\ `�,�"� � I O V r
\ \, ...� � � � O
_� :.,.E F, � � >+ p �t
� ��11tii�eSUM1,f �` � t
�`� SLiDE
� Zf•P1E�i � �
� ----_. __ �� �.- E �E N C E � o- �
a
PLAYCRAFT 5 2'— 4„ 2 0, — 4��
PROIECT�:NSP168uA38A-3 PtRYviAFT P.EP.
DATE 6/32016 �DRAWN BY:MDM MIN.USE ZONE:36'x 39` I{�duss Ct'aft,IRc. ���c�rss P LAYG RO U N D
FLOOR PLAN
&DETAILS
___ _
APPLESEEDMONTESSORI ecx.ios APPLESEEDMONTESSORI � Foaacs APPLESEEDMONTESSORI e�e�� APPlESEEDMONTESSORE p���K+�
Nwvicw �k�� � z_s , DAIE: 07��7���
SW VIEW . '� ��`` �6 � SEVIENi i� :_1 AGS: NEVIEW ����.u+s t t AG3 .
l�.�
.as Na RC760735
,�i�����i �j/�;'j „����� ISSilE et t�VIs1oN
i �
/ �///�/� ��///�'� / �,
�//�����/i //�'���i�a,;, ,��/������% ' _ an�aerrK
����/,����� ti. //,� a �iii��/� ea
, iii�/%�n!���'�i Grq,,,. �w.�.�w,
„ 1
; 'y j �� �i �
� � � � , �4f�� � � �� it.
p N' t_ 2
" � s'"- , ;; �� �;.
, �
�� 1i ry��s�� � ��ir � �7 £�f {� .y� r, � �2s � ��� .��4 •. � ,,
f ,. � D ,s� ■�.
, � � 1 s {-s-_
* i
r �� � � ' � ��� �.. � �b
F),1y - �-j .�� � y� � ,�''�� c��'i F.i .� ',h.. ygg ,�'� . . �J
'y t '�..��'�..� �� °"vi� 4� �Fi�yg 3��....��'➢�'"'"�.� '*,� SJ s�it 1';�.:XM; � � . . . ..
.,`� ., �� ,.� .. . � .
" --»; . . e
F ';,' i �J T �� � , '- .'' __ z"-�°" ""�^„ 4{ n,� � g
R. � � ��� � �
. ,' ;`". �ij�'ad' 9 ti � � � . . . . r__.. �2 .
4
y r r"� /"�} ;,� � � h `� « ��' �� i �� ,��, q(' �ti`"� 7
��" � ".�' �y,i �� `,� � °`, �a�� ; � <,� B
� ����"'�' ,s � `t,^a, , . �� �:; g a a,,�,� � .. t j ��'y �1 ' �;^�� � . �,G„ #�,},'3� �}:,, �s��, �'�
�
"�� ,y..� � � � .� �� � � -y $
�i � �,` �,'q ��{ � � i f
r� =�' "t � �:� �, +^p`, ���": � 10
�� �� "��&?, `��"a �r�s''A` `
ti
� u;x . �_���'� �
x������ • � it
Ma�
� � �iEE'f N0.
sTw�c�.��r,a3sa�sa;a � . . � .... �W (� sru�rr.2.s.-rs va .,�,��e;�r�°w;�a � �. � �;c�t.rr.a�t..�a . .. . � � • ■�
PW.JJ�r.�SP:�i�3S43 . {}'y'MIPLM�� CRRFT �'�'��;�;h,�ro:�., �PLAYCR�FT °��"`'�"`"�' PEA'tCRAFt '�,-�'�°`�"��`..� �PlAYC�
DATE�'Qi6 �wJ.:t'N3Y:MDCf ��ia� :�rc�..+�5 ��2{'ti�kfi*f�.F�'�e �p� E.+..3%J'.tRS^,�5 EES',�.1�3:_lilQ.B
flRAWN BY:
��
� ;u
i;,
i
:;;
;�a
c � �—{ ��j
ROOM NAME AND
ROOM SIZE TOTAL BLDG 29'-� � O M�
LOCATION {S.F.) (S.F.) o _� 30,�8- � H ��
1 CJ � v v
{E� CLASSROOM #'I 727 ^ P /wor��=e wnx o ��
�� CLASSROOM_�2 717 �
(� VESTIBULE 97 � O ��
BLDG A �E) KITCHEN 169 1,985 � �I �"
�/ w
(�',} STORAGE 66 r�l ^ �
(E� PAN. dt MECH. 47 v rOl �
�CLO. X 9 162 � v ��
g ,d ,ti
� FOYER 34� BLDG C aa5 �$�a6� e i��9
38� S. `n FTS���`ns.�� F�Y�����
�E� LOBBY i � �o ������ � :E�_sa�
� �AEN'S ��7 � TAL 4.091 SQ FT n �g$a��.,�g,a�+;g"�'•��'3�
�E) WOMEN'S 114 TOTAL OCCUPANT LOAD = 160 ��x��6�� �����������
�_ a�"� ����€fi�<s�s �
,(E�MECH• i ��� a c �§ $b
2� V
��6R�kg�$���s�1��$a
BLDG B ��� CLASSROOM � 3 511 ��894 y�o�o s��s ��SE� ��
� 40 a
�E)CLT O_X 5 78 -4z�`
,3���
�E) OFFlCE #1 88 �'�'o°'��c�
�� Or FFICE �Z 'I4'I SY-CMENG T5N o-24�
� STOR• 49 �
w/�cH�nNc c�wrna-s��x � i
�EITOILRT RM 24 �O �
BLDG C �E) SANCTUARY 2.091 2,091 �B0 � � Q
�V — (,� t�
5.970 6.�. .�. —
a � � _
� `° � �— 'C
N �/�/�
8' � .� .}��.�d$ •� �O 8,� ,� N �• '�
■�
� � L �
6'— 21'-7" � 11'-2' L � U
` �� U
7�—t" 6'-10" 7'-8"N ■� 'a
in = � (Cf
6'-3' � in 15' " � � a/
��� � � �
.
1 -�• a•-a � �. �
� —��� N
�' �w�rNc� � � � .�
N .�.gQ�� p N '� � �
380/15�26'" `� � � N
11'-8 8'-B" 15'-5' 16'-D' 6'-T 16'-11" �� � � N
� � � � �
o • �
8'0'xB'B' 6'� 'g' � 8'0'x6'8' 8'0'x8'8° d•�• •8• 24 ' � � Q�
o � 3» � � �
� � ' E Q
� 10 10 13 0 86/100�1�i � �' '�
� BLQG A `�' 07 f'� 88 SQ PT� BLDG B '� �
' c�c�.�'�3 6'0- 8- `° FLOOR PLAN
� N (f�(Y.A'4SR00Y!1 N ��C1_ASSR�Oi/!2 3,Q�itB�g. Z p Sll SD FT
I �
p O 0 7�.SQ� N �7.SQ� .�� � � .S���Z�� �
I M M cV ' o i
� V1 � �A�.t.�uY. M a M
M 72�/2o-s� ��/2o-3s . �,t3'-e' � �a�tE: 07/07/16
IEL� �r-z• �r-s"
� I'o � �3 ^ �Bs�� m �oe No.RC160735
i
i � 141/100�2 iv ISStJE d�REVISION
� � 6 SQ F7 '
o ��k
� � � � 8' � 1 - -
"' � � �. 2
f � 11'-9' 48°-3" 3
\
w �Z�
(E� � q 4
30'-0" 5
m a� a
5�_j�- •_Z' •_p' `_p' •_g" •_g• •_p^ g•_l� �p_p' 6
� 7
3�-t0"3�-10" 64'-6" � 3`-10"
B
\
\ 9
�------- INSTALL NEW SENK IN CLASSROOM � 2 �o
�
�ff ��
SHEET N0.
FLOOR PLAN
�: ,,�-_,�-�- A2.'I
E)RAWN BY: YC
� �
LU1LSl'3N br f�SSC)Ci�iTES
i.Atdi�SGAPE RRC;HITECTURE
81y S.A�W DfEGfl i'C�AG • BERKELEl',CF��9707
t�k�3��t0•E�t�1-"?6d,= � E�.i:wt;srrr,61�%��si7Qit.cr�ri3 �at`o
� � m m
� �i M�°
� � ��
L �
U �
£f�iD�GA'ES EiC2&FiNG T��iGEY � "'�, L.
EX1STtNG TREE�EGEND 'Z �;,n,�s.�s c,�,��,�-;���,;,,�,?,T,- � �
----___._.____._.__.._______._�._._.____.._.._....._.__....._..______.-----....----------_._.._.._._.__._._._...-------__._.-=---------.__._.__.__.-----.__..._._.._..-----.._..._.._.._._..
�Y aorar:Ec�..iccr>r�o�Kare � crn�iTicrs csr.�.��;o~�s v ^� �'�
F��STi��ES � _—_ � � �.—��
=Ti �F2dxMtls SFF'...—.-._.__��..._... A5t-t- C.:�GD : � l�M +i�i
ET2 L.�rGGEl25'F2C�E!'IA I.YAR'S. CRFPE I"'!'i27LE PAIR TO C"s'1C1'3{' 6 �"�AGH?"�N7 7.''�'"-�5 �
ET3 £i1GALYP'TUS GLOBUt1iS`COMPAG7A"—HL::E GtT'i-- ---�PAtR TO!�i9�RI 6 ��'eR 2Et4?CAA. ( r � � �
ET4 GR3E2CU5 AC3RIFCLlA� — CO'-L57 Li%E�auG Fti'iF2'O fs,^.�GD� I3 � r , ��
E i a f'�ulril:5 SPP....�--.--�-�------ .h�"f'J7rU P'JC¢ t r%
ETb PITTQS?flR'ht i3NGULATi,`M--- YiCTCR'A?�!BO'/. FAfR TO Cs''JO�� 3 �...______.._.__._....__._,._....
ET'I CEDR4:5 D��ROR�'1.-_.— G=GGAR GEDAR F„iR TO GOOI: 5 �� �. �. a ��
�TS SEQU03A SE"'PERVIRE*15_.___......____.__.._..GOG.ST R�DW'JOa.._......_........._..._......_.._.._._.._. GO:JB 2 ��� � ��`r-
ET9 CAL�'cDt�JB DEG:R.r2EN5— tX�tGEkFiE CEDAR-----------.— =OGR 0 �� �� r�� 's'�aa�ge�$P� g .&��`��*�_
:7'0 hS1Y?cN15 BOti1Ri�S— MAY?EN C�,^.GR r � �mn����5��k s��;�'�
�T':i LEGtiB'fF�lM Li.SC!DWM -� ...�_.- ...-.-...-.-....fsLOSSY-PRl��7— 'rA>R d 1 � �°��'���n�g ;��g����F
ET,2 5GNlnEl5rtOtLE G6LiF.}=EPFER x2EE PO�JR 4 � ���.;��§����£,$�����y
ew r�� an e g
���s9�Yd�k$Y��.�+ pa�
"E`C`dabi�.FAfrdSi P���BEi'�i
NOTES
_.._......_....._...__.............._.__._....._._.__-----..�.._.__.._.....__.._....._.............._..._._..---------....__-___._---________..._...__._._._.._____.._.._______----_._.......---....__-----._._............_...._..............._....._.................._.�....
�� 1.ALL EXISTING TREE5 ARE tC9 REMAIN. ,..---"���
2.AP?RO}(iMATc CROUR�t G1st10PY AS 5F'rOIYAI. -�-"""'��
�'\ 3.APPROXI!'fATE iREE C.41_IPER fDIF.�"tE?ER AT BREt+Si FS�fCs}+3.DS.�J IN Ih1GF-tE5�IDI1R,1 ON PLAN. �.�--"`�'
'� �.s�.
� J��.--
~� J O L L Y M A N L N ,,.----''�f II J
�T� � ��,.,.s' � �
-=�- a .,� ,,,.,---
�— .-. ..--
� �,��..-- L
\ ' � -� ....,.��„.<— � — � �> > — — Y � � �
( � �� � V
ew re e ��8. , � 3 - �� , F��S�.�T�:s .� � a
: : . _
/ E ,
•—l...._._.._.._._� I � ,"� �, IN SNtS df2E.5. � � �
` ��._— . . �.. `'� Al NLJT SURYEYED
,
\ � , l � —
�� cz '�----'''._......._.._..._..._...�...... �-. �.. / \ .N �
�`�.. ,1 ! `'. ` `"'` '� � '� � C3
� : , .. _ _ .-
, �.._.
� -----, -
• ` .�..�:-}—
� ,._.__..__.._._
, �
� �, ; ,� i / � �z• �.?.. �
,, � y -- �
�•� ( i , , ,i 1 1� T�' , � � �
�• ''�, ._._..._......................... _.__....__._._._. -----�i ' "02�
� 1 � ,� t a �......_ . �� � 1 ,� � o
_'�;
i � � �
�C �. { --- — ----- ,, i \ \,,..�/
, ,:
p ��a �— ��-- Lt' c
-,-_�. ...._,..__ _---------------- ;�
` ',� ` �`' , .- � 'a a�'i
! .���,� > ; E�' L M�
� �{� f --� j f���,�"_.�..�p. , x,-�''`t � _ �+
50 l� � 6Xi5?ih4G 7F�E5 ��1� � f `�' � �}
( � i�Tuis c.2Fa /, ' v \� 0
� � r�oT s�R�ereo �r � � ( I �� }��`�✓ � "�3 lLa
/�/ � i � rT .t `, C a
z .-- ___ � _;. �.-_���-.._._ ��. /! , ____�-� ca � �
_ ,—�
� ..._.... .. �� i� L 3 ; � ��._-� � �r' 2 � C')
_—
.=._�.. ___��._._._... ._......._.�._.....�................ .....__.._._._._7;� �L -�� ��—' cY,1571 FLAY � �
J ,.� ,r""` � .� _---; i—, ra�� k �'j�'^� ------
� � '�
.,�1f1�..-' � ' � .�._.._ �'.. .,..._.�_-' , r _....
� � i
� i— �Ti __�s.s� �/ � �.._.. ;.....i ` � �_ \ s`a� '� = LANDSCAPE
.-''"f! / ' , ° �
� � /iL— ( �� �.. ... � .��.J'���.° � _.. � � PIAN
........p.._........9._......p.........._.a..._.p........................._.._.._. �
�� "
/�
.m7v.mm¢a..-..A..f..:. :...f
V� �r� �t�V V } �p Y�� '— � f E� ' a.rv t Ans�: tOj10/16
€ t n �r.�. ;�, € � � � f�m� t .�Q+�o.RC160735
� I t l�_ w 3 3 r � ���. � , ; �� 1 ' issR��acnaresr.
i__. i a s -�z��� :� �
�
; � � � ---w,.�� 1
Q � �� � J --'� ,-_-__---- ��--
3,', _ - _
,� o �`' G �:_..,s ...(�. . _.._.............._.
/'� !Y��`Y, � � �3� + �-� �1� /"�'x'Y"�/ /^ `�T ;.._..W.
� t t
� �``sr��t f d c � ..-�-. ��__1� -{- 1 --� --- r � -4 _�___,_ _.�.___._--
�� t5 1'3�12''�I��AJ ` ',8��� ",� Z���..�',� l '8 f-0. J2. /i«e. )f7�/ �6.1 18' / �_ ...�_._........___ _.
.... ..� .._.
♦
. ....._..,..........,_..
6; �"' `�r d„ ♦ `w� �..� �.�..,��`J, ..` / s y__.._..
fi
�' zi �� -�-
� _..._ ..... �
� � j �,-� ._----- --_�.._..
� s} —
�� ���
--� :F
se+�rs s•-zw-o�
SHEE7 t{p,
L-1
�v.ax�t t;r:
� �
�C�)ST+Q�! R�O�JI�D-3.5 MODULAi� PLAYSYSTEM
Estimated Fall Height
. .
��0 �
� e 0 � � '�
. . � 13 11
. . . o 0 0 ,�
�a �
� � Qp� �
� �
.
. .
. .
.. . .. .
� . -
. . �
�
� � � �
. � � �
.
......
GENERAL NOTES:
• THE SITE PLAN SHOWN IS BASED ON MEASUREMENTS THAT WERE PROVIDED TO KRAUSS CRAFT,INC.AT THE TIME OF THE PROPOSAL REQUEST. ALL DIMENSIONS MUST BE VERIFIED PRlOR TO THE SUBMISSI�N�F A PURCHASE ORDER.
KRAUSS CRAFT,tNC.WILL NOT BE RESPONSIBLE FOR ANY DISCREPANCIES BETWEEN ACTUAL QtMENSIONS AND DtMENSIONS SUBMITTED ON A PROPOSAL REQUEST.
• THE MINIMUM USE ZONE FOR THE PLAY STRUCTURE IS BASED ON THE PRODUCT DESIGN AT THE TIME OF THE PROPOSAL. COMPONENTS AND STRUCTURE DES[GN MAY BE SUBJECT TO CHANGE WHICH MAY AFFECT DIMENSIONS.THEREFORE,
BEFORE PREPARING SITE,WE STRONGLY RECOMMEND OBTAINiNG FINAL DRAWINGS FROM THE FACTORY(AVAILABLE AFTER THE ORDER IS PLACED AND INCLUDED IN THE ASSEMBLY MANUAL).
• WARN[NG:ACCESSIBLE SAFETY SURFACING MATERIAL iS REQUIRED BENEATH AND AROUN�THIS EQUIPMENT THAT HAS A CRITICAL HEIGHT VALUE(FALL HEIGHT)APPROPRIATE FOR THE HIGHEST ACCESSIBLE PART OF THIS EQUIPMENT.
REFER TO THE CPSC'S HANDB�OK FOR PUBL[C PLAYGR�UNa SAFETY,SECTi4N 4:SURFACING.
■ �' ` �' ;
SN: R3590F6FC '� � � ��������� ; �
Date: 11/22/16 Sca[e: 1/4" = '['-4" ���� �� '
�:t��uf�ctu�ed b�a4r�uss Grafi,Irtc a
Drawn By: KLF �S,P�i, ;
v,r•v�r.�iay::r;�tEsysl�rt�s.c::rs�n ,
_ _ _ _ _ __ _
��� a,?. �������� ADA ACCESS181L17�'GU141ELlNE-AaAAG CO�IFORMA�tCE , ,,;.,°
��� ���5
"�'�� '����' �LEVATEO ALCESSIBLE RAMp ACCESSISLE +GftOUN� TYPES � ����
`� a/5 C) 2/3 2,�:3
2-S
GENER�IL NUTES:
Pvly �'his conce�tual rai�-�ra is�ased
1�1�ve nn inf�r�t7�atit�n pr�vid�d pric���
SIi�1C �tc�c�c�nsti•we�tirari,Detaitet�sit�
inf�rra7atiUn,ii�clucdiny Tl�e
�i�y-�='�1t� follc�wir�c�,shnulcl tae ok�taira�d,
S�?�p-i,��3�rL'i evafuated,arui i�tilixed in tlze
H����c�r�il� finr�l�roject desiyr�.Exact,ite
�`'� dime��sio��s,topra�r°��}.�fly,
�� � existinc�t�tiliti�s.soi!cc�r�r.litions
�� ar�cl r.lrain��t�e sc�futic�ns.
��
� WARNING:Arcc�ss��ile safety
�� surfaciaig ntateri��al is rer�uired
�2" t�eneati�and arqi.�nr.l th�s
�`....J �tS� aq�npmenk that has a critical
St�E�' �'O��f I�eight valu�(Fall Heic�l�#)
" ��a�� ata�rapriate ic�r�the hic�f�est
� accessibie part nf this
eq��i�r7zent.R�fer t�a ti�e CI�SC'S
Tr��sfec .��,� ��„ � Q�� �8'°€:?i:�� M��nelk.sc�ok�r.,r P�iblic
`'.S�e��iC7t1 .�`r��ta�'t�fPf
c� Playt�ra�.inrl S�fety,Sctc:tiesn 4;
5cfrfacing
—_ �>1LIIEiC:Cf
"," r� -- '� �:—..s�,.�� �.i�U-�7ciV�
:��" \� �'� `,... ca 4 Clirr�be�
r e�r `� d c, G� � `°�
�k3" ,.�
f'at��l �.��� -........_„�..
�2uarter ,f �``----`'
Tur�7 / ' � y
�. / .
�.'����'.: �,J r�•/f� � ��{�r . � �.�c.7'��
,,,,/ �r F'QSt
�'"'� �C�" F3�i! �be�c�w�
�� � � Par�el
.
� �► � � � _. . _ , I�i I'(;S�)f)t14C`1�(? CI1L SI�i' I�I'cltl C~t)Il"1t11C'.C1�5 ��r� iter��� #S : i'lrt�r�rc,ur��:i;t�•c�c;tur-e-
C��ruxe t� . ,, -� �3ii�7�r���c>n �f tlic��l��y�i-r��urlc6 �:c�ui��l�c;r�� (��r��tl�, �viclt�l and ���i�;��t)
p �v��c.E.t ��=x �I�� Yrc�u��c�c�c Lxi ����nt ir�fc�rmatic�r� ��e a�t�3chccl
i:;lir��k��;t ur��u;st I;�af �'�' 1 P (,�` ) :
(�,�,�����) 1. ��`l��o�r�;t-���li ���ll I�e�i�l��t c��t`C�1c�sC�-�ic;t�li•� is rr����rl�it �".
^t�`��i� i� �t�ken fi`()l11 ti�lC`. I11��1t'SI: �Icl� E7tC�G�,'.()il ��1�SC1-rfc:ti��-c�w��iLl� i� ���� �' slic{e.
2. T���tc�� vir�w o�F tl�te��t���ctut•e c1c�i�n �hc�w� t�-�� vaE-i<���iti ���i���ts c���t��c���-ue�tt�re: ��
���lc� it����;t��a�•ca�vicics a s��(e�o use �t��•rlr�� t•��nc�c�m me;rr�ur•e�n���t.
''� Tht� t�l�I �1Cl�Il� O�t�1C S�"1-tai�ut•e i�; ra�c�cl fc�c•5'-
Tlte;�t�u�cc•e c��ck� ac•�3(��'° a.crc�;�s ��r1d tl�� i-fc�x c�eck i���"���:�•c�s�;.
��I'���;���i�I��s t��th� v�ric�u�;ci�;cks ar��G"14�"I5�"f(�Cl'".
3. Tfic;c�titc��•all �ir�: (�v(in Us��r����c�F`�C�' �3���� Cl(7� Et1C'CIICIIIl�;
tl��G' ���t�C �:r�������rc��ur�ci t��c;c�c���i������:n�.
TLn,�st�r
fi1i�e
STRUCTURE#: R359aF6F�
�RC7IECT�#: NSP16B6A3�A-1 P'LAY�R�FT REP: ' �
Y ,t� ;"���.
DATE: �f2212a�� � DRAWi� BY: KJ� il�1lN. USE.�Uf�E: 3�` x 39° : �k,
�SP'3