Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
14030061I CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 1111 S STELLING RD
OWNER'S NAME: GURUDATTA AND SWATI SAVALE
PERMIT NO: 14030061
DATE ISSUED: 05/23/2014
OWNER'S PHONE: 4085977991 I , I PHONE NO:
0 LICENSED CONTRACTOR�'SS DECLARATION
License Class (
_ Lic. # 1600 2—
Contractor I \\ &W Date 5-. 23.20 C�
I hereby affirm that I am licensed under the provisions of Chapter 9
(commencing with Section 7000) of Division 3 of the Business & Professions
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self -insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
I have and will maintain Worker's Compensation Insurance, as provided for by
Section 3700 of the Labor Code, for the performance of the work for which this
permit is issued.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is
correct. I agree to comply with all city and county ordinances and state laws relating
to building construction, and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We) agree to save
indemnify and keep harmless the City of Cupertino against liabilities, judgments,
costs, and expenses which may accrue against said City in consequence of the
granting of this permit. Additionally, the applicant understands and will comply
with all non -point source regulations per the Cupertino Municipal Code, Section
9.18. (-\„
JOB DESCRIPTION: RESIDENTIAL E] COMMERCIAL
CONSTRUCT ONE STORY ADDITIONS (384 SQ FT);
ATTACHED GARAGE (415 SQ FT); FRONT COVERED
PORCH
(36 SQ FT); REMODEL (E) GARAGE AND BEDROOM (662
SQ
Sq. Ft Floor Area: I Valuation: $90000
APN Number: 36222008.00 1 Occupancy Type:
PERMIT EXPIRES IF WORK IS NOT STARTED
WITHIN 180 DAYS OF PERMIT ISSUANCE OR
180 DA LLED INSPECTION.
/ RE -ROOFS:
Date 20 /4- All roofs shall be inspected prior to any roofing material being installed. If a roof is
installed without first obtaining an inspection, I agree to remove all new materials for
inspection.
❑ OWNER -BUILDER DECLARATION
I hereby affirm that I am exempt from the Contractor's License Law for one of
the following two reasons:
I, as owner of the property, or my employees with wages as their sole compensation,
will do the work, and the structure is not intended or offered for sale (Sec.7044,
Business & Professions Code)
I, as owner of the property, am exclusively contracting with licensed contractors to
construct the project (Sec.7044, Business & Professions Code).
I hereby affirm under penalty of perjury one of the following three
declarations:
I have and will maintain a Certificate of Consent to self -insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
1 have and will maintain Worker's Compensation Insurance, as provided for by
Section 3700 of the Labor Code, for the performance of the work for which this
permit is issued.
I certify that in the performance of the work for which this permit is issued, I shall
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of California. If, after making this certificate of exemption, I
become subject to the Worker's Compensation provisions of the Labor Code, I must
t'orthwith comply with such provisions or this permit shall be deemed revoked.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is
correct. I agree to comply with all city and county ordinances and state laws relating
to building construction, and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We) agree to save
indemnify and keep harmless the City of Cupertino against liabilities, judgments,
costs, and expenses which may accrue against said City in consequence of the
granting of this permit. Additionally, the applicant understands and will comply
with all non -point source regulations per the Cupertino Municipal Code, Section
9.18.
Signature
Date
Signature of Applicant: Date:
ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER
HAZARDOUS MATERIALS DISCLOSURE
I have read the hazardous materials requirements under Chapter 6.95 of the
California Health & Safety Code, Sections 25505, 25533, and 25534. I will
maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the
Health & Safety Code, Section 25532(a) should I store or handle hazardous
material. Additionally, should I use equipment or devices which emit hazardous
air contaminants as defined by the Bay Area Air Quality Management District I
will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and
the Health & Safety Code, Sections 25505, 25533, and 25534.
Owner or authorized agent Date:
r--�\kW� A14&
CONSTRUCTION LENDING AGENCY
I hereby affirm that there is a construction lending agency for the performance of
work's for which this permit is issued (Sec. 3097, Civ C.)
Lender's Name
Lender's
ARCHITECT'S DECLARATION
I understand my plans shall be used as public records.
Licensed Professional
CUPERTINO
❑ NEW CONSTRUCTION
CONSTRUCTION PERMIT APPLICATION
COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
v bo
(408) 777-3228 • FAX (408) 777-3333 • buildingQcupertino.org
9 ADDITION X ALTERATION / TI ❑ REVISION / DEFERRED ORIGINAL PERMIT #
PROJECT ADDRESS
II s,S LI Gr Z), . G11,p6cINO of
AFN #
362 - 22 -008
OWNER NAME PHONE
u r�u�ATTA 5WATI SAVALo- 5 - q
E-MAIL
seLV'�t_te G a %tom , Gorn
STREET ADDRESS
1 { 1 I 576LG l NC -f p�D .
CITY, STATE
Gel Per -TIN 0, CA '115014
FAX
-
CONTACT NAME
lkNCNAW GRJVAsTAVA
PHO
D -7O -O 13
E-MAIL
�anC�lc�% ScZti1 rn�eYrbr
S. DRESS
4 W_FAZA bA DA.
CITY, STATE, ZIP
s N CA--
FAX
DIiSiI�NE�
❑ OWNER ❑ OWNER -BUILDER OWNER AGENT ❑CONTRACTOR ❑CONTRACTOR AGE T ❑ ARCHITECT ❑ ENGINEER ❑ DEVELOPER ❑TENANT
CONTRACTOR NAME
M,ITu PAT �L
LICENSE NUMBER
©
LICENSE TYPEBUS.
g
LIC #
COMPANY NAME
5 A GoNST�C7toN INC
hnlI-u '� �SaaJr. AGO G'`C7Y1
FAX
STREET ADDRESS
I i�lo r L
CITY, STATE, ZIP
o CA eltoo �
PHONE
0 r _ 2q o .3
A CHTTECT INEER NAME
�v�
LICENSE NUMBER
BUS. LIC #
+C9)
C�JALI / `AX
COMPANY NAME
E-MAILSAN E -MAI /I //
Y 12I rp- Gl C-fN
SGIYId hcLG<<—
STREET ADDRESS
A eA piz.
CITY, STATE, ZIP
SAN SQeE CA 9512-C
PHONE
400 - 70 5 - D44 B
DESCR ONOFWORK �j('IDJJ C� �N) r'iASt£�. ���BATHIWA�� - IN CL©., CN) LAaNmy kent-J,
' ON V er-'sico ot- �'� Dr - (F_) 6rA�76 /NTe 1l�gJTi o&PE oi'wr-,.' coilvQ2-S'IoN op Ar
CS M' To (N) LIVJN6f, (N) F,�YiP 1x eOWZA, RU.04A-CION or- shrp,t-y
.h
EXISTING USE
cJlP�
�Y H
PROPOSED USE CONSTR.
s,. 1 FAH.
TYPE
a /�
�J
# STORIES
�1
14'3
USE
TYPE
OCC. SQ.FT.
VALUATION (S)
p�/
�'EXIS4 G of
� FLOOR
s
AREA
NETAL
T AREA I 1
-
BATHROOM
- KITCHEN.
OTHER 11 7-V
REMODEL AREA
REMODEL AREA
REMODEL AREA z G
PORCHAREA
y
31O
DECK AREA
TOTAL DECKIPORCH AREA
GARAGE AREA. - DETACH
-Sr ATTACH
77�
36 Sr
# DWELLING UNITS:
IS A SECOND UNIT ❑YES
SECOND STORY ❑ YES
1
BEING ADDED? 'NO
ADDMON? )RNO
PRE -APPLICATION ❑ YES IF YES, PROVIDE COPY OF
IS THE BLDG AN ❑ YES
RECEIVE ON:
PLANNING APPL #'ONO PLANNING APPROVAL LETTER
EICHLER HOME? Gel NO
ljD
By my signature below, I certify to each of the following: I am the property owner or autlW ' agent to act on owner's behalf. I have read this
application and the information I have provided is correct. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local
ordinances and state laws relating to building construction. I authorize representatives of Cupertino to enter the above -identified propertyfor inspection purposes.
Signature of Applicant/Agent- Date: 04A D I
SUPPLEMENTAL INFORMATION REQUIRED
PLAN CHECK TYPE
ROUTING SLIP
❑ OVER-THE-COUNTER
❑ BUILDING PLAN REVIEW
_ New SFD or Multifamily dwellings: Apply for demolition permit for
existing building(s). Demolition permit is required prior to issuance of building
permit for new building.
❑ EXPRESS
❑ PLANNING PLAN REVIEW
_ Commercial Bldgs: Provide a completed Hazardous Materials Disclosure
❑ STANDARD
❑ PUBLIC WORKS
form if any Hazardous Materials are being used as part of this project.
❑ LARGE
❑ FIRE DEPT
_ Copy of Planning Approval Letter or Meeting with Planning prior to
❑ MAJOR
❑ SANITARY SEWER DISTRICT
submittal of Building Permit application.
❑ ENVIRONMENTAL HEALTH
Bldg,4pp_2011.doc revised 06/21/11
'caavn
,����� � CITY OF CUPERTINO
ll�"_�l►�I. 11TIPF. FQTTMATOR — RITILDING DIVISION
ki,ADDRESS:
1111 S STELLING RD
DATE: 03/10/2014
REVIEWED BY: MELISSA
PC FEE ID
APN: 362 22 008
Bm /V'030p(p
`VALUATION: 1$90,000
*PERMIT TYPE: Building Permit
PLAN CHECK TYPE: Addition
PRIMARY
USE: SFD or Duplex
2nd Unit? Yes • No
OTC? 0 Yes E) No
PENTAMATION 1 R3SFDADD
PERMIT TYPE: i
WORK
ADD 384 S.F. TO FRONT & REAR OF SFD TO CREATE N ATTACHED GARAGE 2 N
SCOPE I
BEDROOMS, 1 (N) BATHS,1 (N) LAUNDRY RM & 36 S.F OF PORCH AREA. REMODEL (E) p
OCCUPANCY TYPE:
TYPE OF
CONSTR.
FLR AREA
s.f.
PC FEES
PC FEE ID
BP FEES
BP FEE ID
R-3 (Custom)
II-B,III-B,NN-B
384
$1,579.00
IADDPLCK
$1,284.00
1ADDINSP
U (Private Gar/Ag Bldg)
II-B,III-B,IV,V-B
415
$0.00
IUIPLNCK
$1,252.00
1UIINSP
Suppl. Insp. Fee -0 Reg. Q OT
0.0
hrs
$0.00
PME Unit Fee:
$0.00
PME Permit Fee:
$47.00
TOTALS:
799
$1,579.00
$2,536.00
MECH, HOURLY 0 Yes (F) No
PLUMB, HOURLY Q Yes Q No
ELEC, HOURLY Q Yes Q No
MISC ITEMS
Plumb. Plan Check 0.0 1 hrs $0.00
Plan Check Fee:
$1,579.00
Plumb. Permit Fee: IPPERMIT
Remodel, Other
IREMRESOTH
Other Plumb Insp.E0.0 $47.00
Rol
NOTE: This estimate does not include jees due to other Departments (i.e. rtanntng, ruouc works, rue, ,3anuury Sewer uiurtu, JA[VVt
.,:._: , 1 TG ... r ..� A r-1 nn A. nrgfi— Nnn, infnrMatinn availahle and are anly an estimate. Contact the Dent for addn 7 info.
FEE ITEMS (Fee Resolution 11-053 U.'71'1113)
FEE
QTY/FEE
MISC ITEMS
Plan Check Fee:
$1,579.00
F 662 1 s.f.
$558.00
Remodel, Other
IREMRESOTH
Suppl. PC Fee: Q Reg. Q OT
Rol
hrs
$0.00
PME Plan Check:
$0.00
F 1 #
$28.00
Plumbing
/PRWHEATR Water Heater
Permit Fee:
$2,536.00
Suppl. Insp. Fee -0 Reg. Q OT
0.0
hrs
$0.00
PME Unit Fee:
$0.00
PME Permit Fee:
$47.00
0
0
Work Without Permit? 0 Yes No
$0.00
Advanced Planning Fee: 1PLLONGR
$111.86
Select a Non -Residential
Building or Structure
0
A
Travel Documentation Fee: ITRA VDOC
$47.00
Strong Motion. Fee: IBSEISMICR
$9.00
Select an Administrative Item
Bldg Stds Commission Fee: IBCBSC
$4.00
SUBTOTALS:
$4,333.86
$586.00
TOTAL FEE:
$4,919.86
Revised: 01/15/2014
Building Department
City Of Cupertino
10300 Torre Avenue
Cupertino, CA 95014-3255
Telephone: 408-777-3228
C U P E RT I N O Fax: 408-777-3333
CONTRACTOR / SUBCONTRACTOR LIST
JOB ADDRESS: I I , VQ ut)060.
CA PERMIT # / `' U 3 U U(,
OWNER'S NAME: U
PHONE # SO
GENERAL CONTRACTOR.56t. 01 Cpl c
AC BUSINESS LICENSE #
ADDRESS: 0
�(p
S0I CITY/ZIPCODE: i►o So
*Our municipal code requkjs all businesses working in the city to have a City of Cupertino business license.
NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE
GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CITY OF CUPERTINO
BUSINESS LICENSE.
I am not using any subcontractors:
Signature Date
Please check applicable subcontractors and complete the following information:
f
wne
r/ Contractor Signature
SUBCONTRACTOR
BUSINESS NAME
BUSINESS LICENSE #
Cabinets & Millwork
Cement Finishing
r"
?j
Electrical
Excavation
Fencing
Flooring / Carpeting
Linoleum / Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
-
Masonry
Painting / Wallpaper
Paving
Plastering
Plumbing
Roofing
, Z L
ice
Septic Tank
Sheet Metal
Sheet Rock
Tile
f
wne
r/ Contractor Signature
T� iL, `1 F I L r
CERTIFICATE OF INSTALLATION
CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans
(Page 1 of 8 )
Project Name: Swati Savale
Enforcement Agency: Cupertino Building
Department
Permit Number:
14030061
Dwelling Address: 1111 S Stelling Rd
City: Cupertino
Zip Code:
95014
A. General Information
O1
Dwelling Unit Name
Swati Savale
02
Climate Zone
4
Dwelling Unit Total Conditioned Floor
Number of space conditioning (SC)
03
Area (ft2)
500
04
systems being altered in this dwelling
1
unit.
05
Certificate of Compliance Type
Prescriptive alterations (CF1R-ALT)
06
Method used to calculate HVAC loads
ACCA_ManualJ
Calculated dwelling unit Sensible
Calculated Dwelling Unit Heating Load
07
Cooling Load (Btuh)
24000
08
(Btuh)
35000
09
Dwelling Unit Number of Bedrooms
2
MCH -01b Prescriptive Alterations - Space Conditioning Systems Ducts and Fans
Registration Number: 316-A1018963A-M0113394A-0000
U.S. Energy Raters Association
Registration Date/Time: 2016-01-28 12:37:05
HERS Provider: USERA
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-28 12:38:39
Schema Version: 2013.1.006
CERTIFICATE OF COMPLIANCE CF1R-ALT 02-E
Alterations to Space Conditioning Systems (formerly CF -IR -ALT -HVAC) (Page 2 of 3 )
D. Altered Space Conditioning System (Sections 150.2(b)IE and F)
This section does not apply to this project.
E. Entirely New or Complete Replacement Duct System, with or without Equipment Changeout (Sections 150.2(b)lDiia and 150.2(b)lE, F)
This section does not apply to this project.
F. Entirely New or Complete Replacement Space Conditioning System (Section 150.2(b)1C)
01
02
03
04
05
06
07
08
09
10
it
Heating
Cooling
System
Heating
Minimum
Cooling
Minimum
Required
Identification or
Heating System
Altered Heating
Efficiency
Efficiency
Cooling
Altered Cooling
Efficiency
Efficiency
Thermostat
New Duct
Name
Type
Component
Type
Value
System Type
Component
Type
Value
Type
R -Value
System 1
Central gas
All new heating
AFUE
78
No cooling
No cooling
SEER
14
SetbackTher
R-6
furnace
components
component altered
mostat
Required Documentation:
CF2R-MCH-03-E - Space Conditioning Systems Ducts and Fans
-Duct insulation requirement for new plenums: R6.
CF2R & CF3R-MCH-20 } ... ct Leakage Verification required.
-Leakage rate complia 6%.
CF2R & CF3R-MCH 22 fficacy Verifon
CF2R & CF3R-MCH 23 Air Flowfete Verii tion
-Compliance: Fan Effica "'7d Sys m/ton.
- Alternative Compliance. C Y� MCH -28 Ret ur esign Verification is an alternative to MCH -22 and MCH -23 verification.
CF2R & CF3R-MCH-25-H Refrigerant Charge Verification required when rrape�fnt c�T�Wi�ir a�¢ t}�d q�a(r�di•�ppl
�
Exceptions: -+•a7• GIF4 �liil f.3 H.7.7VL
Heating -only systems are exempt from the 0.58 W/cfm and 350 cfm/ton requirements.
Note:
An "entirely new or replacement duct system" means at least 75 percent of the duct system is new duct material, and up to 25 percent may consist of reused parts from the dwelling unit's existing duct system (e.g.,
registers, grilles, boots, air handler, coil, plenums, duct material) if the reused parts are accessible and can be sealed to prevent leakage
Registration Number: 316-A1018963A-000000000-0000 Registration Date/Time: 2016-01-24 12:30:39 HERS Provider: USERA
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-24 12:31:44
Schema Version: 0.555SDD
- ,.
CERTIFICATE OF COMPLIANCE
CF1R-ALT-02-E
Alterations to Space Conditioning Systems (formerly CF -IR -ALT -HVAC) (Page 3 of 3 )
Documentation Author's Declaration Statement
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:
Minxuan Liu
Documentation Author Signature:
Signature Date: Y Y �►�- (J`' "_
Company:
Santa Clara HERS
2016-01-24
Address:
CEA/ HERS Certification Identification (if applicable):
1181 Sundown Ln
410231431
City/State/Zip:
Phone:
San Jose CA 95127
408-883-3865
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer).
3. That the energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the
requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets,
calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
5. 1 will ensere that a registered copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable
inspections. I understand that a registered copy of this dertificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name:
Responsible Designer Signature:(�
Mitul Patel
/ 1 iTt,L ILTeL
Company:
Date Signed:
Saanya Constructi
2016-01-24
Address:
10343 Mary Ave U.S. Energy Ra
License:
oaAssociation
City/State/Zip:
Phone:
Cupertino CA 95014
650-996-4083
US
Registration Number: 316-A1018963A-000000000-0000
RA
U.S. Energy Raters Assoclatlon
"This digital signature is provided in order to secure
the content of this registered document, and in no
way implies Registration Provider responsibility for
the accuracy of the information.'
Registration Date/Time: 2016-01-24 12:30:39
HERS Provider: USERA
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-24 12:31:44
Schema Version: 0.555SDD
CERTIFICATE OF INSTALLATION
CF2R-MCH-20-H
Duct Leakage Diagnostic Test
(Page 1 of 3 )
Project Name: Swati Savale
Enforcement Agency: Cupertino
Building Department
Permit Number:
14030061
Dwelling Address: 1111 S Stelling Rd
City: Cupertino
Zip Code:
95014
A. System Information
01
Space Conditioning System Identification or Name
System 1
02
Space Conditioning System Location or Area Served
Whole house
03
Building Type from CF -1R
Single family
04
Verified Low Leakage Ducts in Conditioned Space
(VLLDCS) Credit from CF1R?
No, credit is not taken
05
Verified Low Leakage Air Handling Unit (VLLAHU) Credit
from CF1R?
No, credit is not taken
06 j
Duct System Compliance Category
Replacement
MCH -20d - Complete Replacement or Altered buct System
B. Duct Leakage Diagnostic Test'
01
Condenser Nominal Cooling Capacity (ton) U.S. Ervergy
Raters Association
02
Heating Capacity (kBtu/h)
39.00
03
Conditioned Floor Area served by this HVAC system (ft2)
500
04
Duct Leakage Test Condition
Test final
05
Duct Leakage Test Method
Total leakage
06
Leakage Factor
.06
07
Air Handling Unit Airflow (AHUAirflow) Determination
Method
Heating system method
08
Measured AHUAirflow
0
09
Calculated Target Allowable Duct Leakage (cfm)
50
10
Actual duct leakage rate from leakage test measurement
44
L(cfm)
11
Compliance Statement
System passes leakage test
Registration Number: 316-A1018963A-M20009631A-0000 Registration Date/Time: 2016-01-29 13:49:30 HERS Provider: USERA
CA Building Energy Efficiency Standards Report Version: 2013-1.006 Report Generated: 2016-01-29 13:51:09
2013 Residential Compliance Schema Version: 2013.1.006
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 2 of 3 )
C. Additional Requirements for Compliance
01
System was tested in its normal operation condition. No temporary taping allowed.
Outside air (OA) ducts for Central Fan Integrated (CFI) ventilation systems, shall not be sealed/taped off during duct leakage
02
testing. CFI OA ducts that utilize controlled motorized dampers, that open only when OA ventilation is required to meet
ASHRAE Standard 62.2, and close when OA ventilation is not required, may be configured to the closed position during duct
leakage testing.
03
If a complete replacement, all supply and return register boots were sealed to the drywall.
04
Building cavities were not used as plenums or platform returns in lieu of ducts.
05
If cloth backed tape was used it was covered with Mastic and draw bands.
06
All connection points between the air handler and the supply and return plenums are completely sealed.
If the system complies using the Smoke Test method, the smoke test was conducted in accordance with the requirements
07
of Reference Residential Appendix RA3.1.4.3.6. Systems that comply using smoke test shall not be included in sample
groups for HERS verification compliance.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have
been met.
U.S. Energy Raters Association
Registration Number: 316-A1018963A-M20009631A-0000 Registration Date/Time: 2016-01-29 13:49:30 HERS Provider: USERA
CA Building Energy Efficiency Standards Report Version: 2013-1.006 Report Generated: 2016-01-29 13:51:09
2013 Residential Compliance Schema Version: 2013.1.006
CERTIFICATE OF INSTALLATION CF2R-MCH-20-H
Duct Leakage Diagnostic Test (Page 3 of 3 )
Documentation Author's Declaration Statement
1. 1 certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Documentation Author Signature:
Minxuan LiuW
Signature Date:
Company:
Santa Clara HERS
2016-01-29
Address:
CEA/ HERS Certification Identification (if applicable):
1181 Sundown Ln
410231431
City/State/Zip:
Phone:
1408-883-3865
San Jose CA 95127
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Installation is true and correct.
2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design,
construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of
Installation and attest to the declarations in this statement (responsible builder/installer), otherwise I am an authorized representative of the
responsible builder/installer.
3. The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation
conforms to al] applicable, codes and regulations, and the installation conforms to the requirements given on the plans and specifications approved by
the enforcement agency.
4. 1 understand that a HERS rater will check the installation to verify compliance, and that if such checking identifies defects; I am required to take
corrective action at my expense. I understand that Energy Commission and HERS Provider representatives will also perform quality assurance checking
of installations, including those approved as part of a sample group but not checked by a HERS rater, and if those installations fail to meet the
requirements of such quality assurance checking, the required corrective action and additional checking/testing of other installations in that HERS
sample group will be performed at my expense.
5. 1 reviewed a copy of the Certificate of Compliance approved by the enforcement agency that identifies the specific requirements for the scope of
construction or installation identified on this Certificate of Installation, and I have ensured that the requirements that apply to the construction or
installation have been met. U.S. Enerav Raters Association
6. 1 will ensure that a registered copy of this Certificate of Installation shall be posted, r ade available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of
Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Responsible Builder/Installer Signature:
Mitul Patel
Company Name: (Installing Subcontractor or General Contractor or
Position With Company (Title): q -ez
Builder/owner)
President Mitul Patel (Jan 29, 2016)
Saanya Construction Inc.
Address:
CSLB License:
10343 Mary Ave
968702
City/State/Zip:
Phone:
Date Signed:
Cupertino CA 95014
650-996-4083
12016-01-29
Third Party Quality Control Program (TPQCP) Status:
Name of TPQCP (if applicable):
This digital signature is provided in order to secure
U RA,
the content of this registered document, and in no
way implies Registration Provider responsibility for
U.S. Energy Raters Association the accuracy of the information.'
Registration Number: 316-A1018963A-M20009631A-0000 Registration Date/Time: 2016-01-29 13:49:30 HERS Provider: USERA
CA Building Energy Efficiency Standards Report Version: 2013-1.006 Report Generated: 2016-01-29 13:51:09
2013 Residential Compliance Schema Version: 2013.1.006
r4b (=--I F I L r
CERTIFICATE OF INSTALLATION
CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans
(Page 1 of 8 )
Project Name: Swati Savale
Enforcement Agency: Cupertino Building
Department
Permit Number:
14030061
Dwelling Address: 1111 S Stelling Rd
City: Cupertino
Zip Code:
95014
A. General Information
01
Dwelling Unit Name
Swati Savale
02
Climate Zone
4
Number of space conditioning (SC)
03
Dwelling Unit Total Conditioned Floor
500
04
systems being altered in this dwelling
1
Area (ft2)
unit.
05
Certificate of Compliance Type
Prescriptive alterations (CF1R-ALT)
06
Method used to calculate HVAC loads
ACCA_ManualJ
07
Calculated dwelling unit Sensible
24000
08
Calculated Dwelling Unit Heating Load
35000
Cooling Load (Btuh)
(Btuh)
09
Dwelling Unit Number of Bedrooms
2
MCH -01b Prescriptive Alterations - Space Conditioning Systems Ducts and Fans
30
Registration Number: 316-A1018963A-M0113394A-0000
U.S. Energy Raters Association
Registration Date/Time: 2016-01-28 12:37:05
HERS Provider: USERA
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-28 12:38:39
Schema Version: 2013.1.006
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 2 of 8 )
B. Space Conditioning (SC) System Information
O1
02
03
04
05
06
07
08
09
10
11
12
CFA served
Is the SC
Installing a
Installing
SC System
SC System
by this SC
system a
refrigerant
Installing new SC
Installing more
entirely
Installing
Identification or
Location or Area
System
ducted
containing
system
than 40 feet of
new duct
entirely new
Name
Served
(ft2)
system?
component?
components?
ducts?
system?
SC system?
Alteration Type
(CFI)
System
Altered
Heating
Minimum
Altered
Entirely new or
Minimum
Required
Replaced
New
Ventilation
Identification
Heating
Heating
Efficiency
complete
System 1
Whole house
500
Yes
No
Yes
Yes
Yes
Yes
replacement
Component
Type
Value
System Type
Component
Type
Value
Type
Length
space
Status
This field
conditioning
System 1
Central gas
All new
heating
AFUE
,�` F
J. `.780—'
system
C. Space Conditioning (SC) System Alterations Compliance Information
01
02
03
04
05
06
07
08
09
10
11
12
13
Central Fan
Integrated
Heating
Cooling
New or
(CFI)
System
Altered
Heating
Minimum
Altered
Cooling
Minimum
Required
Replaced
New
Ventilation
Identification
Heating
Heating
Efficiency
Efficiency
Cooling
Cooling
Efficiency
Efficiency
Thermostat
Duct
Duct
System
or Name
System Type
Component
Type
Value
System Type
Component
Type
Value
Type
Length
R -Value
Status
This field
This field
System 1
Central gas
All new
heating
AFUE
,�` F
J. `.780—'
ryrye/
d2yoIjQ
*
L
or
6jlatj
or
jjction is
Setback
GT40Ft
R6
Not a CFI
furnace
componen
rt�oAnAs
is not
not
system
altered
is
applicabl
applicabl
e
e
Registration Number: 316-A1018963A-M0113394A-0000
Registration Date/Time: 2016-01-28 12:37:05
HERS Provider: USERA
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-28 12:38:39
Schema Version: 2013.1.006
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 3 of 8 )
D. Installed Heating Equipment information
01
02
03
04
05
06
07
System Identification or
Name
Heating Efficiency Type
Heating Efficiency
Value
Heating Unit
Manufacturer
Heating Unit
Model Number
Heating Unit serial
number
Rated Heating Capacity,
Output (BTUH)
System 1
AFUE
97.000
Carrier
59TP5A0040E14--
1914A51135
39000
Notes:
E. Installed Cooling Equipment information:
This section does not apply to this project.
F. Extension of Existing Duct System, Greater Than 40 Feet
This section does not apply to this project.
G. Installed Duct System information
01
02
03
04
05
06
07
08
Method of
compliance with duct
E
p .,
eiQy �
rat /► "sgiQ
♦♦
) aiUQQDuct
and filter grille sizing
SC System
SC System Location
Sup44•59et
requirements in
Number of Air Filter
Identification or Name
or Area Served
Location
R -Value
Location
R -Value
150.0(m)13
Devices on System
System 1
Whole house
Unconditioned
R-6
Unconditioned
R-6
System is exempt
0
attic
attic
Notes:
Registration Number: 316-A1018963A-M0113394A-0000
Registration Date/Time: 2016-01-28 12:37:05
HERS Provider: USERA
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-28 12:38:39
Schema Version: 2013.1.006
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 4 of 8 )
H. Installed Air Filter Device Information
This section does not apply to this project.
I. Air Filter Device Requirements
01
The system shall be designed to ensure that all recirculated air and all outdoor air supplied to the occupiable space is filtered before passing through the system's
thermal conditioning components.
The system shall be designed to accommodate the clean -filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum
allowable clean -filter pressure drop at the design airflow rate applicable to each air filter device shall be determined, and all system air filter device locations shall be
02
labeled to disclose the applicable design airflow rate and the maximum allowable clean -filter pressure drop. The labels shall be permanently affixed to the air filter
device, readily legible, and visible to a person replacing the air filter media, and the air filter devices shall be provided with air filter media that conforms to these
determined or labeled maximum allowable clean -filter pressure drop values as rated using AHRI Standard 680.
03
All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner.
04
The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 6 when tested in accordance with ASHRAE Standard
52.2, or a particle size efficiency rating equal to or greater than 50 percent in the 3.0 to10 micron range when tested in accordance with AHRI Standard 680.
05
The system shall be provided with air filtermedia that has been labeled by the manufacturer to disclose the efficiency and pressure drop ratings that conform to the
required efficiency and pressure drop requirements for the air filter device.
The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met.
U.S. Energy Raters Association
Registration Number: 316-A1018963A-M0113394A-0000 Registration Date/Time: 2016-01-28 12:37:05 HERS Provider: USERA
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-28 12:38:39
Schema Version: 2013.1.006
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 5 of 8 )
J. HERS Verification Requirements
01
02
03
04
05
06
07
08
09
10
MCH2O
MCH21
MCH22
MCH23
MCH25
MCH28
Exemption
from
Minimum
Exemption
R -Value for
AHU Fan
AHU
SC System
SC System
From Duct
Duct
Ducts In
Ducts Located
Efficacy
Airflow
Identification or
Location or Area
Leakage
Leakage
Conditioned
In Cond Space
(W per
Rate (cfm
Refrigerant
Return Duct Design
Name
Served
Requirements
Test
Space
Verification
cfm)
per ton)
Charge
Table 150.0-C or D
System 1
Whole house
No
Yes
Not
No
No
No
No
No
exemptions
applicable
Notes:
Registration Number: 316-A1018963A-M0113394A-0000
U.S. Energy Raters Association
Registration Date/Time: 2016-01-28 12:37:05
HERS Provider: USERA
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-28 12:38:39
Schema Version: 2013.1.006
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 6 of 8 )
K. Space Conditioning Systems, Ducts and Fans Mandatory Requirements and Additional Measures
Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the
system that are altered. Existing equipment may be exempt from these requirements.
Heating Equipment
01
Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency
Regulations.
02
Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant
to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(1), 110.2(b).
03
Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections
150.0(h)1 and 2).
04
Furnace Temperature Rise: Central forced -air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum
inlet -to -outlet temperature rise specification. See Section 150.0(h)4.
05
Standby Losses and Pilot Lights: Fan -type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d).
Cooling Equipment
06
Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency
Regulations.
Refrigeran�#i4e Insulation: All refrigerant line kisulation in split system air conditioners and heat pumps must meet the R -value and protection requirements of Section
07
150.0(j)2 ar:d n 15Aciti =h
08
Condensing Unit Location: Condensing units shall nUb$laEe rl lyeRe4efSdik-e,,600*&t�Mction 150.0(h)3A.
09
Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section
150.0(h)1 and 2.
Air Distribution System Ducts, Plenums and Fans
10
Insulation: In all cases, unless ducts are enclosed entirely in directly conditioned space, the minimum duct insulation value is R-6. Note that higher values may be
required by the prescriptive or performance requirements. See Section 150.0(m)1.
Registration Number: 316-A1018963A-M0113394A-0000 Registration Date/Time: 2016-01-28 12:37:05 HERS Provider: USERA
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-28 12:38:39
Schema Version: 2013.1.006
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 7 of 8 )
K. Space Conditioning Systems, Ducts and Fans Mandatory Requirements and Additional Measures
Note: Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the
system that are altered. Existing equipment may be exempt from these requirements.
Connections and Closures: All installed air -distribution system ducts and plenums must be, sealed and insulated to meet the requirements of CMC Sections 601.0,
11
602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply -air and return -air ducts and plenums must be insulated to a minimum installed level of R-6.0 or
enclosed entirely in directly conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference
Residential Appendix RA3.1.4.3.8.
Heat Pump Thermostat
12
A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c).
13
The thermostat shall be installed in accordance with the manufacturers published installation specifications
14
First stage of heating shall be assigned to heat pump heating.
15
Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met.
The responsible person signature on this compliance document affirms that all applicable requirements in this table have been met.
Registration Number: 316-A1018963A-M0113394A-0000
U.S. Energy Raters Association
Registration Date/Time: 2016-01-28 12:37:05
HERS Provider: USERA
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-28 12:38:39
Schema Version: 2013.1.006
CERTIFICATE OF INSTALLATION CF2R-MCH-01-E
Space Conditioning Systems, Ducts, and Fans (Page 8 of 8 )
Documentation Author's Declaration Statement
1.1 certify that this Certificate of Installation documentation is accurate and complete.
Documentation Author Name:
Documentation Author Signature:
Mitul Patel
Signature Date:
Company:
Saanya Construction Inc.
2016-01-28
Address:
CEA/ HERS Certification Identification (if applicable):
10343 Mary Ave
968702
City/State/Zip:
Phone:
1650-996-4083
Cupertino CA 95014
Responsible Person's Declaration statement
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Installation is true and correct.
2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials,
components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement (responsible builder/installer), otherwise I am an
authorized representative of the responsible builder/installer.
3. The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations, and the
installation conforms to the requirements given on the plans and specifications approved by the enforcement agency.
4. I reviewed a copy of the Certificate of Compliance approved by the enforcement agency that identifies the specific requirements for the scope of construction or installation identified on this Certificate of
Installation, and I have ensured that the requirements that apply to the construction or installation have been met.
S. I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all
applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Builder/Installer Name:
Responsible Builder/Installer Signature:
Mitul Patel
Company Name: (Installing Subcontractor or General Contractor or Builder/Owner)
Position With Company (Title): i72r[ Q7e[
Saanya Construction Inc.Mitul
Patel (Jan 28, 2016)
Address: 13.9. Energy Ra
ernAssociation
10343 Mary Ave
968702
City/State/Zip:
Phone:
1650-996-4083
Date Signed:
Cupertino CA 95014
12016-01-28
TM
This digital signature is provided in order to secure
the content of this registered document. and in no
way implies Registration Provider responsibility for
U.S. Energy RatDers Assoclatlon the accuracy of the information.'
Registration Number: 316-A1018963A-M0113394A-0000 Registration Date/Time: 2016-01-28 12:37:05 HERS Provider: USERA
CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version: 2013-1.006 Report Generated: 2016-01-28 12:38:39
Schema Version: 2013.1.006
CUPERTINO
PURPOSE:
CALGREEN RESIDENTIAL CHECKLIST — MANDATORY
ITEMS
COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISI
ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL X
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3228 - FAX (408) 777-3333 - building dcuoertino a
The 2013 CalGreen Code applies to all newly constructed hotel 'h tels�
dormitories, condominiums, shelters, congregate residences, em loye�4
other types of swellings with sleeping accommodations and new accesso
uses. Existing site and landscaping improvements that are not otherwise
requirements of CALGreen.
Project Name:
FICFam C. 0.
't-UPERTINO
Bufloing Department
ghpuses, dwellings,
factory -built housing and
i! Firigs associated with su h
(�ed�rerr4dt<s��j�t �''!-�AN�"'FE
Ktsv�cvJriu io�r. �/ew" '"/NTHf
Project Address: III I S . S' �e Q (,t� ,ta,p ,,, (A L4
Project 1
Description: AeDDIT0 '
p _ N _ (N) MlkS . Ji NoTN t 1 A
Instructions: f 'GK I-IVINA g-rvt4 --rawAr-pe-TNE Ff2.VNT.
1. The Owner or the Owner's agent shall employ a licensed professional experienced with the California
Green Building Standards Codes to verify and assure that all required work described herein is properly
planned and implemented in the project.
2. The licensed professional, in collaboration with the owner and the design professional shall initial Column
2 of this checklist, sign and date Section 1 - Design Verification at the end of this checklist and have the
checklist printed on the approved plans for the project.
3. Prior to final inspection by the Building Department, the licensed professional shall complete Column 3
and sign and date Section 2 - Implementation Verification at the end of this checklist and submit the
completed form to the Building Inspector.
Column 2
MANDATORY FEATURE OR MEASURE Project
Requirements
Planning and Design - Site Development
4.106.2 Storm water drainage and retention during construction. A plan is 4
developed and implemented to manage storm water drainage during
construction.
4.106.3 Grading and paving. The site shall be planned and developed to I t-�
keep surface water away from buildings. Construction plans shall indicate how
site grading or a drainage system will manage all surface water flows.
Column 3
Verification
7
rage I of 5 CalGreen 2014. doe revised 01/15/14
A4.2
General
4.201.1 Low-rise residential buildings shall meet or exceed the minimum ® ❑
standard design required by the California Energy Standards.
.. .3 WATER EFFICIENCY AND CONSERVATION
Indoor Water Use
4.303.1 Water conserving plumbing fixtures and fittings. Plumbing fixtures
(water closets and urinals) and fittings (faucets and showerheads) shall comply
with the following:
❑ 4.303.1.3.2 Water Closets. The effective flush volume of all water closets
shall not exceed 1.28 gallons per flush. Tank -type water closets shall be
certified to the performance criteria of the U.S. EPA WaterSense
Specifications for Tank -type Toilets.
❑ 4.303.1.3.2 Urinals. The effective flush volume of urinals shall not
exceed 0.5 gallons per flush.
❑ 4.303.1.3.1 Single Showerheads. Showerheads shall have a maximum
flow rate of not more than 2.0 gallons per minute at 80 psi. Showerheads
shall be certified to the performance criteria of the U.S, EPA WaterSense
Specification for showerheads.
❑ 4.303.1.3.2 Multiple Showerheads serving one shower. When a
shower is served by more than one showerhead, the combined flow rate of
all showerheads and/or other shower outlets controlled by a single valve
shall not exceed 2.0 gallons per minute at 80 psi, or the shower shall be
IV
designed to allow only one shower outlet to be in operation at a time.
❑ 4.303.1.4.1 Residential lavatory faucets. The maximum flow rate of
residential lavatory faucets shall not exceed 1.5 gallons per minute at 60
psi. The minimum flow rate of residential lavatory faucets shall not be less
than 0.8 gallons per minute at 20 psi.
❑ 4.303.1.3.2 Lavatory faucets in common and public use areas. The
maximum flow rate of lavatory faucets installed in common and public use
areas (outside of dwellings or sleeping units) in residential buildings shall
not exceed 0.5 gallons per minute at 60 psi.
❑ 4.303.1.4.3 Metering faucets. Metering faucets when installed in
residential buildings shall not deliver more than 0.25 gallons per cycle.
❑ 4.303.1.4.4 Kitchen Faucets. The maximum flow rate of kitchen faucets
shall not exceed 1.8 gallons per minute at 60 psi. Kitchen faucets may
temporarily increase the flow above the maximum rate, but not to exceed
2.2 gallons per minute at 60 psi, and must default to a maximum flow rate
of 1.8 gallons per minute at 60 psi.
4.303.2 Standards for plumbing fixtures and fittings. Plumbing fixtures
and fittings shall be installed in accordance with the California Plumbing Code,
and shall meet the applicable standards referenced in Table 1401.1 of the
California Plumbing Code.
Page 2 of 5 Cul Green 2014.doc revised 01115114
Outdoor Water Use
4.304.1 Irrigation controllers. Automatic irrigation systems installed at the
time of final inspection shall be weather-based.
❑ 4.304.1.1 Controllers shall be weather- or soil moisture-based controllers
that automatically adjust irrigation in response to changes in plants' needs
as weather conditions change. ®
❑
❑ 4.304.1.2 Weather-based controllers without integral rain sensors or
communication systems that account for local rainfall shall have a separate
wired or wireless rain sensor which connects or communicated with the
controller(s). Soil moisture-based controllers are not required to have rain
sensor input.
.. .4 MATERIAL CONSERVATION AND RESOURCE EFFICIENCY
Enhanced Durability and Reduced Maintenance
4.406.1 Rodent proofing. Annular spaces around pipes, electric cables,
r }
conduits, or other openings in plates at exterior walls shall be protected
against the
®
❑
passage of rodents by closing such openings with cement mortar,
concrete masonry or similar method acceptable to the enforcing agency.
Construction Waste Reduction, Disposal and Recycling
4.408.2 Construction waste management plan. Where a local jurisdiction
does not have a construction and demolition waste management ordinance, a
®
construction waste management plan shall be submitted for approval to the
❑
enforcing agency.
Building Maintenance and Operation
4.410.1 Operation and maintenance manual. At the time of final inspection, ,,�r/�/
an operation and maintenance manual shall be provided to the building /u®, ❑
occupant or owner.
A4.5 ENVIRONMENTAL QUALITY
replaces
03.1 General. Install only a direct-vent sealed-combustion gas or sealedod-burning fireplace,
L
®
❑
or a sealed woodstove.
Pollutant Control
4.504.1 Covering of duct openings and protection of mechanical
equipment during construction. Duct openings and other related air
❑
distribution component openings shall be covered during construction.
4.504.2.1 Adhesives, sealants and caulks. Adhesives, sealants and caulks
shall be compliant VOC
❑
with and other toxic compound limits.
4.504.2.2 Paints and coatings. Paints, stains and other coatings shall be
©
compliant with VOC limits.
❑
4.504.2.3 Aerosol paints and coatings. Aerosol paints and other coatings
1
N�
shall be compliant with product weighted MIR Limits for ROC and other toxic
❑
compounds.
Page 3 of 5 CalCreen_2014.doc revised 01/15/14
4.504.2.4 Verification. Documentation shall be provided to verify that
compliant VOC limit finish
®
❑
materials have been used.
4.504.3 Carpet Systems. Carpet and carpet systems shall be compliant with
VOC limits.
®
❑
4.504.4 Resilient flooring systems. Eighty (80) percent of floor area
receiving resilient flooring shall comply with the VOC-emission limits defined in
the Collaborative for High Performance Schools (CHPS) Low -emitting
Materials List or be certified under the Resilient Floor Covering Institute (RCFI)
FloorScore program.
4.504.5 Composite wood products. Particleboard, medium density
fiberboard (MDF), and hardwood plywood used in interior finish systems shall
comply with low formaldehyde emission standards.
Interior Moisture Control
4.505.2 Concrete slab foundation. Required vapor retarders and capillary
breaks
are also required to comply with CalGreen Section 4.505.2.1.
4.505.3 Moisture content of building materials. Moisture content of building
materials in
®
❑
used wall and floor framing is checked before enclosure.
Indoor Air Quality and Exhaust
4.506.1 Bathroom exhaust fans. Exhaust fans which terminate outside the
building in
®
❑
are provided every bathroom.
Environmental Comfort
4.507.2. Duct systems are sized and designed and equipment is selected
using the following methods:
1. Establish heat loss and heat gain values according to ACCA Manual J or
equivalent.
13
2. Size duct systems according to ACCA 29-D (Manual D) or equivalent.
3. Select heating and cooling equipment according to ACCA 36-S (Manual S)
or equivalent.
INSTALLER AND SPECIAL INSPECTOR QUALIFICATIONS
Qualifications
702.1 Installer training. HVAC system installers are trained and certified in
the installation HVAC
®
❑
proper of systems.
702.2 Special inspection. The Licensed Professional responsible to verify
CALGreen compliance is qualified and able to demonstrate competence in the
discipline they inspect and verify.
Verifications
703.1 Documentation. Verification of compliance with CALGreen may
include construction documents, plans, specifications, builder or installer
certification, inspection reports, or other methods acceptable to the enforcing
agency which
®
❑
show substantial conformance. Implementation verification shall
be submitted to the Building Department after implementation of all required
measures and prior to final inspection approval.
Page 4 of 5 CalGreen 2014. doe revised 01/15/14
CALGREEN SIGNATURE DECLARATIONS
Project Name:QV0.{�
Project Address:
Project Description: /A Daiyey4 e A (N) j1,95Ti;� �E c7D1,( fklJprHi�>n 2�%d� 01�_0
t,A, tI PP—Y Ale8A SZ-_ A-wALe:-1H GG©, IoW,—, .D,5 TKe- 94ij�-AA e)r- kdu6r_
SECTION 1 - DESIGN VERIFICATION
Complete all lines of Section 1 -"Design Verification" and submit the completed checklist (Columns 1 and 2) with the
plans and building permit application to the Building Department.
The owner and design professional responsible for compliance with CalGreen Standards have revised the plans and
certify that the items checked above are hereby incorporated into the project plans and will be implemented into the
project in accordance with the requirements set forth in the 2013 California Green Building Standards Code as
adopted by the City of Cupprtjhq;
Owner's Signature Date
Owners Name (Please Print)
DeWgn Pmfessionei's Sionahue Date
S ,A4 G4 A L I VA 0 TAVA
Design Professional's Name (Please Print)
Signature of License Pro ssional responsible for CalGreen compliance Date
=996 - 4 0�
Name of License Professlonal responsible for CalGreen compliance (Please Print) Phone
..
Email Address for License Professional responsible for CalGreen compliance
SECTION 2 - IMPLEMENTATION VERIFICATION
Complete, sign and submit the competed checklist, including column 3, together with all original signatures on Section
2 to the Building Department prior to Building Department final inspection.
I have inspected the work and have received sufficient documentation to verify and certify that the project identified
above was constructed in accordance with this Green Building Checklist and in accordance with the requirements of
the 2013 California Green Building Standards Code as adopted by the City of Cupertino.
Signature of License Professional responsible for CalGreen compliance Date
Name of License Professional responsible for CalGreen compliance (Please Print) Phone
for
Page 5 of 5
responsible for
CalGreen 2014 doc revised 0111 i/14
Mf -,-FAL f�COFiNG t3P��,.
CUPERTINO GUIDE
8uiltling DepDepartmentme
APR 14 2014 SPECIFICATION
Manufacturer: REVIEWED FOR CODE COMPLIANCE
40
DECRA Roofing Systemsrteviewea ray.
A Fletcher Building CompanyOFFICE
1230 Railroad Street (Xi
Corona, CA 92882
951-272-8180 phone
951-272-4476 facsimile
www.decra.com
SECTION 07313 [07 31 131
STONE COATED METAL ROOF SHINGLE
This guide specification has been prepared by DECRA Roofing Systems, in printed and electronic media,
as an aid to specifiers in preparing written construction documents for stone coated metal Shingle..
Edit entire master to suit project requirements. Modify or add items as necessary. Delete items
which are not applicable. Words and sentences within brackets r reflect a choice to be made
regarding inclusion or exclusion of a particular item or statement. This section may include performance,
proprietary and descriptive type specifications. Edit to avoid conflicting requirements. Editor notes to
guide the specifier are included between lines of asterisks to assist in choices to be made. Remove
these notes before final printing of specification.
This guide specification is written around the Construction Specifications Institute (CSI), Section Format
standards references to section names and numbers are based on MasterFormat 95 [2011 update].
For specification assistance on specific product applications, please contact our local product representa-
tives throughout North America at 800-795-0776.
SUBMIT -IAL
#2
aRECEjvED
APR 042014
i3y
DECRA Roofing Systems reserves the right to modify these guide specifications at any time. Updates to
this guide specification will be posted to the manufacturer's web site and/or in printed matter as they oc-
cur. DECRA Roofing Systems makes no expressed or implied warranties regarding content, errors, or
omissions in the information presented.
DECRA Roofing Systems, Inc. Stone Coated Metal Roof DECRA Shingle
Master Guide Specifications 07313-1 04-30-2013
PART 1 - GENERAL
1.1 SUMMARY
A. Related Documents: Provisions established within General and Supplementary Conditions of
the Contract, Division 1 — General Requirements, and the Drawings are collectively applicable
to this Section.
B. Section Includes: Formed metal roofing panels with colored stone chip finish.
C. Associated metal flashings.
Edit the Related Sections paragraph below to suit project requirements; delete sections that will not be used, or add
sections as required.
D. Related Sections:
1. Division 6 Section "Rough Carpentry" for framing and sheathing.
2. Division 7 Section "Sheet Metal Flashing and Trim" for metal flashing, gutters, and
downspouts.
3. Division 7 Section "Roof Accessories" for roof ventilators.
4. Division 7 Section "Joint Sealants" for field -applied sealants.
5. Division 9 Section "Painting" for painting of roof accessories.
E. Alternates.
#*###*#*##*#+r •. .. ,. .**iii##*#########*k*k##k**##*4**#****i***t****!f#fi4f#t*ff!#ifff#4f#f#4!*#**t*##}#k**#*ffk*4*44ti4fNlf#ff#f
If work of this section will affect alternate bids, retain the following subparagraph.
1. Refer to Section 01230 [01 23 00] for alternatives involving work of this Section.
1.2 SUBMITTALS
Include submittal requirements below, which are consistent with the scope of the project and extent of work of this
section - only request submittals, which are necessary for review of design intent.
Do not request submittals if drawings sufficiently describe the products of this section or if proprietary specifying
techniques are used. The review of submittals increases the possibility of unintended variations to drawings.
Insert the appropriate reference to the Division 1 section
A. Submit under provisions of Section 01300 L 1 [01 30 001.
B. Product Data: Include construction details, material descriptions, dimensions of individual
components and profiles, finishes, fasteners, accessories, and manufacturers written installation
instructions.
C. Shop Drawings: Include roof plans and elevations; sections at hips, ridges, gables, valleys, and
eaves; and details of components, accessories, and attachments to other work.
D. Samples for Initial Selection: Manufacturer's color charts and samples consisting of units or
sections of units showing the full range of colors, textures, and patterns available for each type
DECRA Shingle indicated.
1.3 QUALITY ASSURANCE
A. Regulatory Requirements:
1. Conform to applicable building code for roof assembly fire hazard requirements.
2. Conform to building code for minimum wind uplift resistance.
DECRA Roofing Systems, Inc. Stone Coated Metal Roof DECRA Shingle
Master Guide Specifications 07313-2 04-30-2013
1.4 REFERENCES
A. Fire -Test -Response Characteristics: Provide DECRA Shingle with fire -test -response
characteristics indicated, as determined per test method ASTM E108 — Test for Fire Resistance
of Roof Covering Materials, for application and slopes indicated.
1. Fire -Test Exposure: Class A.
B. ASTM A792/A792M: Sheet Steel, Aluminum -Zinc Alloy Coated by the Hot Dip Process,
Structural (physical) Quality.
C. UL 1897 and UL 580: Wind Uplift Resistance of Roof Assemblies.
D. ASTM C920: Specification for Elastomeric Joint Sealants.
E. Impact Resistance: UL 2218, Class 4.
F. Appraisal Certificates:
1. International Code Council (ICC), Whittier California, Report No. ESR 1483.
2. Underwriters Laboratories, Inc., Northbrook, Illinois, USA File No. R14710.
3. Canadian Construction Materials Center, Ottawa, Ontario, CCMC#13085-R.
G. [Texas Department of Insurance Report RC -280 — Wind Resistance].
1.5 DELIVERY, STORAGE, AND HANDLING
A. Store and handle roofing materials to ensure dryness. Store in a dry, well -ventilated, weather
tight place. Protect from corrosion, staining and traffic and wind damage. Store rolls of felt and
other sheet materials on end on pallets or another raised surface.
1.6 WARRANTY
A. Manufacturing Warranty: Written, transferable, limited warranty provided by DECRA Roofing
Systems, covering manufacturing defects/excessive granule loss. Refer to warranty for
specifics.
1. Warranty Period: 50 years from date of Substantial Completion.
2. Wind Warranty: 120 mph winds, full warranty period.
3. Hail Penetration: full warranty period.
PART2-PRODUCTS
2.1 MANUFACTURER
A. DECRA Roofing Systems, Inc., 1230 Railroad Street, Corona, CA 92882 (951-272-8180), (951-
272-4476 FAX); www.decra.com.
2.2 MATERIALS
A. Metal Shingle: DECRA Shingle three course formed interlocking panels resembling dimensional
roofing shingles.
1. Material: Rolled and pressure formed, Aluminum -Zinc Alloy Coated Steel with three
vertical ribs forming three flat steps, each of which shall have raised and lowered pan
sections.
2. Finish: Ceramic coated colored stone chip finish.
3. Thickness: 26 Gauge, .0179 inches (.455 mm).
4. Steel: Grade 37 (Grade 255).
5. Size: 21" wide by 52" long (533 by 1321 mm).
6. Exposure: 19-3/4" wide by 49" long (368 by 1270 mm).
7. Weight: 125 pounds per square.
DECRA Roofing Systems, Inc. Stone Coated Metal Roof DECRA Shingle
Master Guide Specifications 07313-3 04-30-2013
Make color selection from the choices below and delete the colors not required for the project.
8. Color: [Canyon Brown] [Fawn Grey] [Midnight Eclipse] [Vintage Slate] [Woodland Green].
#xi***+x*xx4xf4xxxxxx**4#ixfx4ifx*x#*##*#i#**##*k*###*###***xi*#xxixxx*#ix**4fixl4x#4fi#i4x##44i##*##f#i##fS#fi#4*#+i*xx*#xxfxxxxxx#i
Do NOT use LEAD or COPPER with this aluminum -zinc alloy coated steel roofing system. Do NOT use any treated
wood products that may contain COPPER — i.e. pressure treated or fire retardant.
DECRA Shingle Valley must be used. Include [ ] if desired or needed.
B. Flashing:
1. [Valley: DECRA Roofing Systems, Inc., Shingle Valley and Cap, Aluminum -Zinc Alloy
coated Steel sheet � i es (.455 mm). Pressure formed into a valley with
a stone coated valley cap. Finish: Match upper exposed stone coated surface of the
valley cap to the shingle material/color.]
2. Fascia Metal: DECRA Roofing Systems, Inc., Shingle Starter Clip w/ Drip Edge,
Aluminum -Zinc Alloy Coated Steel sheet, 26 Gaugr_ '� 17s inches (455 mm). Pressure
formed to fit along the leading edge of roof panels at eave/fascia.
3. Rake / Gable Channel: DECRA Roofing Systems, Inc., Shingle Rake/Gable Channel,
Aluminum -Zinc Alloy Coated Steel sheet, 26 Gauge, c; s (.455 mm). Pressure
formed to match roofing material to be applied along rakes and gables. Pre -paint to match as
needed prior to installing panels.
4. Short Course Clip: DECRA Roofing Systems, Inc., Shingle Short Course Clip, Aluminum -
Zinc Alloy Coated Steel sheet, 26 Gauge, .0179 inches (.455 mm). Pressure formed for
use with starting a short course or when Shingle Starter Clip w/ Drip Edge will not
conform to existing eave/fascia.
5. Pipe Jack Flashing: ; . ! ; .g; .0179 inches (.455 mm) galvanized or Aluminum -Zinc
Alloy Coated Steel, clean, prime and paint to match roof material.
6. Underpan: DECRA Roofing Systems, Inc., DECRA Shingle/XD® Underpan: Aluminum -
Zinc Alloy Coated Steel sheet, 26 Gauge, .0179 inches (.455 mm), pressure formed to
counter flash roof penetrations matching Shingle material profile.
C. Hip & Ridge: Shingle Hip & Ridge covers hips and ridges matching shingle material, color, and
finish.
1. Hips / Ridges: DECRA Roofing Systems, Inc., DECRA Shingle Hip & Ridge, Aluminum -
Zinc Alloy Coated Steel sheet, 2.6 Gauge, .0179 inches (.455 mm). Pressure formed to
match roofing material, color, and finish to be applied along hips and ridges.
2. Screws: Minimum No. 9 hex (1/4" diameter) by 1-1/2" long (38.1 mm) minimum, corrosion resistant,
color coordinated to match the panels.
2.3 ACCESSORIES
Do NOT use LEAD or COPPER with this aluminum -zinc alloy coated steel roofing system. Do NOT use any treated
wood products that may contain COPPER — i.e. pressure treated or fire retardant.
A. Sheet Metal Materials: Aluminum -Zinc Alloy Coated Steel sheet: ASTM A 792/A 792M, Class
AZ50 (AZ150) coating designation; minimum Grade 37 (Grade 255).
Verify requirements for ice dam protection with local building code and include [ ] if required/desired.
B. Felt Underlayment: ASTM D 226, Type I, No. 15 or ASTM D 226, Type II, No.30, non -perforated,
asphalt -saturated organic felt.
C. [Perimeter Underlayment: ASTM D 1970; self -adhering, polymer -modified, bituminous sheet
underlayment; 40 mils (1 mm) thick. Provide primer when recommended by underlayment
manufacturer.]
DECRA Roofing Systems, Inc. Stone Coated Metal Roof DECRA Shingle
Master Guide Specifications 07313-4 04-30-2013
D. Sealant: One -part elastomeric polyurethane, sealant as recommended in writing by panel
manufacturer. Where sealant will be exposed, provide in color to match panels.
1. Standard: ASTM C920-86.
E. Fasteners: Screws: Minimum No. 9 hex (1/4" diameter) by 1-1/2" long (38.1 mm) minimum,
corrosion resistant, black or color coordinated to match the panels where visible.
PART 3 - EXECUTION
Include the information in parenthesis [ ] for re -roofing applications, and as required by code, delete if not required.
###+xxx++####xx**x+#+##*##xx++#++##+##++#+##*######*x#*+#+####***+x+#+#+x**x**#+++###xxx+xx#+####*r#+x*#######*++++#+*xxx*#++######xt
3.1 EXAMINATION
A. Examine substrate and conditions for compliance with requirements for maximum moisture
content, soundness of roof deck and other conditions affecting performance of DECRA metal
roofing. [Damaged, rotted or loose roofing materials shall be removed and the substrate
corrected for re -roofing applications]. Proceed with installation only after unsatisfactory
conditions have been corrected.
3.2 PREPARATION
A. Clean substrate of any projections and substances detrimental to metal panel roofing. Cover
knotholes or other minor voids in substrate with sheet metal flashing secured with roofing nails.
B. Coordinate installation of metal shingles with roof deck, flashing and other adjoining work to
ensure proper sequencing. Do not install roofing until vent stacks and other penetrations
through roofing have been installed, are securely fastened and flashing is in place.
C. Inspect and verify exterior stucco and EIFS wall enclosures are completed.
3.3 INSTALLATION
A. General: Comply with manufacturer's written instructions for products and applications
indicated, unless more stringent requirements apply.
B. Underlayment: Apply number of plies required by governing code, but at least one ply, with
each ply overlapping the ply below at least 6 inches (152 mm) and ends lapped at least
s (457 mm).
1. [Omit felt underlayment at areas of perimeter underlayment. Lap felt underlayment over
perimeter underlayment as recommended by manufacturer, but not less than
(51 mm).]
C. [Perimeter Underlayment: Apply minimum 2A inches (609 mm) wide layer of perimeter
underlayment along entire perimeter of surface to receive metal shingles, including at eaves,
ridges, edges, hips, valley, skylights, dormers, and around projections through roof. Exten
perimeter underlayment a minimum of c inches (914 mm) inside exterior wall line at edges.]
D. Valleys: Install in accordance with manufacturer's instructions with a minimum 6 inch (152 mm)
overlap in direction of flow.
E. Flashing: Install as indicated on approved submittals and in accordance with manufacturer's
written instructions.
F. Shingle Panels: Install DECRA Shingle, accessories, flashing, and hip & ridge level and plumb.
Use fasteners per above specifications.
1. Using the recommended offset, the first course of panels lock into the Shingle Starter Clip
w/ Drip Edge.
2. The second course of panels start at the rake edge, valley or hip with a panel that is
inches (711 mm) in length, panel exposure is 25 inches (635 mm), measured from the left
side of the panel.
3. Position the panel into the top clip of the panels on the course below. The center of each
field panel will be placed directly above the overlap of the panels on the previous course.
4. Make sure the top clips of each panel are flush. The maximum allowable gap should be
i s src, ,e Z, (76 mm).
5. Once the panel is in position, firmly push (by hand or foot) on the panel in the area that
overlaps the joint of the two panels below. This will help position the panel for fastener
placement.
DECRA Roofing Systems, Inc. Stone Coated Metal Roof DECRA Shingle
Master Guide Specifications 07313-5 04-30-2013
6. After positioning the panel, firmly push (by hand or foot) on the left side of the panel until
it is locked firmly into the clip -lock of the panel on the course below. Install a fastener in
the upper left corner straight down through the panel.
7. Firmly push (by hand or foot) on the right side of the panel and make sure it is locked into
the previously installed panel. Install a fastener in the upper right portion of the panel.
Placing this fastener at a slight upward angle (45°) will help draw the shingle panel into
the proper locking position. Complete the installation with 2 additional fasteners straight
down into the panel.
Specify the appropriate number of fasteners per code requirements; 4 is standard installation.
8. Fasten each panel with minimum [4] fasteners along top edge of panel.
9. Cut and slot DECRA panels that will terminate at the Shingle Rake/Gable Channel or at
the Valley in accordance with the manufacturer's instructions.
G. Hip & Ridge: Install Shingle Hip & Ridge along hips, ridges and rakes as indicated on approved
submittals and in accordance with manufacturers written instructions. Bend and fold exposed
ends of hips ridges and neatly, cap with an end cap or a piece of similar material.
3.4 CLEANING AND PROTECTION
A. Damaged Units: Replace panels and other components of the work that have been dented,
damaged or have deteriorated beyond successful repair by finish touchup with acrylic coating
and stone chip granules.
B. Cleaning: After completing installation, remove any debris from the roof.
C. Foot Traffic: Avoid walking on side laps.
END OF SECTION 07313 [07 31 13]
DECRA Roofing Systems, Inc. Stone Coated Metal Roof DECRA Shingle
Master Guide Specifications 07313-6 04-30-2013
r
BUILDING ENERGY ANALYSIS REPORT I
SUBMIT PROJECT:'ICE
.�� 1 Savale Residence (Ex + Add)
7i 1111 S. Stelling Rd.
.� Cupertino, Ca.
Project Designer:
San Interior Design
6937 Azalea Dr.
San Jose, Ca. 95120
(408) 705-0448
it. I �A 0 oli,� " I
i>
y CUPERTINO
Building Dapirtment
Report Prepared by: �' ^r*4�
Chuck Clemons
;SPR � � *2,s'-4
Energy Calc Co.
45 Mitchell Blvd. #16 kev,eweii r3y.
San Rafael, Ca. 94903
(415) 457-0990
c+
.ter-��
MgR�,O
Job Number:41�
0307SAV
Date:
3/6/2014
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC — www.energysoft.com.
EnergyPro 5.1 by EnergySoft User Number: 1005 RunCode: 2014-03-06T13:53:23 ID: 0307SAV
I TABLE OF CONTENTS I
Cover Page
Table of Contents
Form CF -1 R Certificate of Compliance
Form MF -1 R Mandatory Measures Summary
HVAC System Heating and Cooling Loads Summary
EnergyPro 5.1 by EnergySoft Job Number. ID: 0307SAV User Number: 1005
1
2
3
9
12
PERFORMANCE CERTIFICATE: Residential Part 1 of 5 CF -1 R
Project Name
Savale Residence (Ex + Add)
Building Type ® Single Family ❑ Addition Alone
❑ Multi Family ® Existing+ Addition/Alteration
Date
3/6/2014
Project Address
1111 S. Stelling Rd. Cupertino
California Energy Climate Zone
CA Climate Zone 04
Total Cond. Floor Area
1, 939
Addition
743
# of Stories
1
FIELD INSPECTION ENERGY CHECKLIST
❑ Yes IZI No HERS Measures -- If Yes, A CF -4R must be provided per Part 2 of 5 of this form.
❑ Yes ❑ No Special Features -- If Yes, see Part 2 of 5 of this form for details.
INSULATION
Construction Type
Area Special
Cavity f r Features see Part 2 of 5 Status
Roof Wood Framed Attic
R-11 1,189
Existing
Wall Wood Framed
None 681
Existing
Floor Wood Framed w/Crawl Space
None 1,196
Existing
Roof Wood Framed Attic
R-30 731
New
Wall Wood Framed
R-13 495
New
Floor Wood Framed w/Crawl Space
R-19 292
New
Slab Unheated Slab -on -Grade
None 451 Perim = 31'
New
FENESTRATION U-
Orientation Area Factor
Exterior
SHGC Overhang Sidefins Shades
Status
Skylight 3.0 1.300
0.73 none none None
Existing
Skylight 4.0 1.300
0.73 none none None
New
Front (E) 36.0 0.550
0.67 none none Bug Screen
Existing
Left (S) 18.0 0.550
0.67 none none Bug Screen
Existing
Rear (W) 80.0 0.550
0.67 none none Bug Screen
Existing
Right (N) 33.5 0.550
0.67 none none Bug Screen
New
Right (N) 7.0 0.550
0.67 none none Bug Screen
Removed
Skylight 12.0 1.300
0.73 none none None
New
Front (E) 13.0 0.370
0.33 none none Bug Screen
New
Left (S) 30.0 0.370
0.33 none none Bug Screen
New
Rear (W) 36.0 0.370
0.33 none none Bug Screen
New
HVAC SYSTEMS
Ot . Heating Min. Eff Cooling Min. Eff Thermostat Status
1 Central Furnace 78% AFUE No Cooling 13.0 SEER Setback
Existing
HVAC DISTRIBUTION
Location Heating
Duct
Cooling Duct Location R -Value Status
HVAC Ducted
Ducted Attic, Ceiling Ins, vented 2.1
Existing
WATER HEATING
Ot . Type Gallons Min. Eff Distribution
Status
1 Instant Gas 0
0.82 No Pipe Insulation
Altered
Ener Pro 5.1 by Ener Soft User Number: 1005 Run Code: 2014-03-06T13:53:23 ID: 0307SAV
Page 3 of 12
PERFORMANCE CERTIFICATE: Residential Part 1 of 5
CF -1 R
Project Name
Savale Residence (Ex + Add)
Building Type m Single Family ❑ Addition Alone
❑ Multi Family ® Existing+ Addition/Alteration
Date
3/6/2014
Project Address
1111 S. Stelling Rd. Cupertino
California Energy Climate Zone
CA Climate Zone 04
Total Cond. Floor Area
1,939
Addition
743
# of Stories
1
FIELD INSPECTION ENERGY CHECKLIST
❑ Yes ❑ No HERS Measures -- If Yes, A CF -4R must be provided per Part 2 of 5 of this form.
❑ Yes ❑ No Special Features -- If Yes, see Part 2 of 5 of this form for details.
INSULATION Area Special
Construction Type Cavity (ft) Features see Part 2 of 5 Status
FENESTRATION U- Exterior
Orientation Area(fo Factor SHGC Overhang Sidefins Shades Status
Right (N) 36.0 0.370 0.33 none none Bug Screen New
HVAC SYSTEMS
Ot . Heating Min. Eff Cooling Min. Eff Thermostat Status
HVAC DISTRIBUTION Duct
Location Heating Cooling Duct Location R -Value Status
WATER HEATING
Ot . Type Gallons Min. Eff Distribution Status
Ener Pro 5.1 by Ener Soft User Number: 1005 RunCode: 2014-03-06T13:53:23 ID: 0307SAV
Page 4 of 12
PERFORMANCE CERTIFICATE: Residential (Part 2 of 5) CF -1 R
Project Name
Savale Residence (Ex + Add)
Building Type ® Single Family ❑ Addition Alone
❑ Multi Family ® Existing+ Addition/Alteration
Date
3/6/2014
SPECIAL FEATURES INSPECTION CHECKLIST
The enforcement agency should pay special attention to the items specified in this checklist. These items require special written
justification and documentation, and special verification to be used with the performance approach. The enforcement agency
determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of
the special justification and documentation submitted.
The HVAC System Existing FAU does not include a cooling system, field verification is not necessary.
HERS REQUIRED VERIFICATION
Items in this section require field testing and/or verification by a certified HERS Rater. The inspector must receive a
completed CF -4R form for each of the measures listed below for final to be given.
Ene Pro 5.1 by Ener Soft User Number: 1005 RunCode: 201403-06T13:53:23 ID: 0307SAV Page 5 of 12
PERFORMANCE CERTIFICATE: Residential (Part 3 of 5) CF-1 R
Project Name
Building Type m Single Family ❑ Addition Alone
Date
Savale Residence (Ex + Add)
❑ Multi Family 10 Existing+ Addition/Alteration
3/6/2014
ANNUAL ENERGY USE SUMMARY
Standard Proposed Margin
TDV kBtu/ft2- r
Space Heating 57.73 47.98 9.74
Space Cooling 26.28 30.07 -3.79
Fans 13.18 13.22 -0.04
Domestic Hot Water 19.56 14.53 5.03
Pumps 0.00 0.00 0.00
Totals 116.75 105.80 10.95
Percent Better Than Standard: 9.4%
BUILDING COMPLIES - NO HERS VERIFICATION REQUIRED
Fenestration
Building Front Orientation: (E) 90 deg Ext. Walls/Roof Wall Area Area
Number of Dwelling Units: 1.00 (E) 254 49
Fuel Available at Site: Natural Gas (S) 472 48
Raised Floor Area: 1,488 (169 420 116
Slab on Grade Area: 451 (N) 312 70
Average Ceiling Height: 8.0 Roof 1,939 19
Fenestration Average U-Factor: 0.48 TOTAL: 302
Average SHGC: 0.53 Fenestration/CFA Ratio: 15.5%
REMARKS
STATEMENT OF COMPLIANCE
CABEC
This certificate of compliance lists the building features and specifications needed
to comply with Title 24, Parts 1 the Administrative Regulations and Part 6 the
�'WO ^"Asses aeon of 6uiklm Ene yCensukann
SM
Efficiency Standards of the California Code of Regulations.
CMck Ck.non.
an-W211. Eno.-W-M
The documentation author hereby certifies that the documentation is accurate and complete.
Documentation Author
��
/
/
Co.Calc Energy ac
Company E:'"r"�
3/6/2014
Address 45 Mitchell Blvd. #16 Name Chuck Clemons
City/state/ZipCity/state/Zip San Rafael, Ca. 94903 Phone (415) 457-0990 Signed Date
The individual with overall design responsibility hereby certifies that the proposed building design represented in this set
of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and
with any other calculations submitted with this permit application, and recognizes that compliance using duct design,
duct sealing, verification of refrigerant charge, insulation installation quality, and building envelope sealing require
installer testing and certification and field verification by an approved HERS rater.
Designer or Owner (per Business & Professions Code)
Company San Interior Design `t)MC AI-1 `✓%kl\%AS-O* a
Address 6937 Azalea Dr. Name
City/State/Zip San Jose, Ca. 95120 Phone (408) 705-0448 Signed License # Date
Ener Pro 5.1 bV Ener Soft User Number: 1005 RunCode: 2014-03-06T13:53:23 ID: 0307SAV Page 6 of 12
CERTIFICATE OF COMPLIANCE:
Residential
(Part 4 of 5) CF -1 R
Project Name
Savale Residence (Ex + Add)
Building Type m Single Family ❑ Addition Alone
❑ Multi Family m Existing+ Addition/Alteration
Date
3/6/2014
OPAQUE SURFACE DETAILS
Surface
Type Area
U- Insulation Joint Appendix
Factor Cavitv Exterior Frame Interior Frame Azm Tilt I Status 4 Location/Comments
Roof
1,189
0.079 R-11
180
22 Existing 4.2.1-A2
Existing Area
Wall
188
0.356 None
90
90 Existing 4.3.1-A1
Existing Area
Wall
334
0.356 None
180
90 Existina 4.3.1-A1
Existing Area
Wall
144
0.356 None
270
90 Existing 4.3.1-A1
Existing Area
Wall
15
0.356 None
0
90 Existing 4.3.1-A1
Existing Area
Wall
297
0.356 None
0
90 Removec 4.3.1-A1
Existing Area
Floor
1,196
0.097 None
0
180 Existing 4.4.1-A1
Existing Area
Roof
731
0.031 R-30
90
0 New 4.2.1-A20
Addition Zone
Wall
17
0.102 R-13
90
90 New 4.3.1-A3
Addition Zone
Wall
90
0.102 R-13
180
90 New 4.3.1-A3
Addition Zone
Wall
160
0.102 R-13
270
90 New 4.3.1-A3
Addition Zone
Wall
228
0.102 R-13
0
90 New 4.3.1-A3
Addition Zone
Floor
292
0.037 R-19
0
180 New 4.4.1-A4
Addition Zone
Slab
451
0.730 None
0
180 New 4.4.7-A1
Addition Zone
FENESTRATION SURFACE DETAILS
ID
Type
Area U -Factor SHGC2
Azm Status
Glazing Type
Location/Comments
1
Skylight
3.0 1.300 Default 0.73 Default
180 Existing
Double Metal Skylight
Existing Area
2
Skylight
4.0 1.300 Default 0.73 Default
180 New
Double Metal Skylight
Existing Area
3
Window
36.0 0.550 Default 0.67 Default
90 Existing
Double Non Metal Clear
Existing Area
4
Window
18.0 0.550 Default 0.67 Default
180 Existing
Double Non Metal Clear
Existing Area
5
Window
80.0 0.550 Default 0.67 Default
270 Existing
Double Non Metal Clear
Existing Area
6
Window
33.5 0.550 Default 0.67 Default
0 New
Double Non Metal Clear
Existing Area
7
Window
7.0 0.550 Default 0.67 Default
0 Removed Double Non Metal Clear
Existing Area
8
Skylight
12.0 1.300 Default 0.73 Default
90 New
Double Metal Skylight
Addition Zone
9
Window
13.0 0.370 NFRC 0.33 NFRC
90 New
LowE Vinyl
Addition Zone
10
Window
30.0 0.370 NFRC 0.33 NFRC
180 New
LowE Vinyl
Addition Zone
11
Window
36.0 0.370 NFRC 0.33 NFRC
270 New
LowE Vinyl
Addition Zone
12
Window
36.0 0.370 NFRC 0.33 NFRC
0 New
LowE Vinyl
Addition Zone
(1) U -Factor Type: 116-A =Default Table from Standards, NFRC =Labeled Value
2 SHGC Type: 116-B = Default Table from Standards, NFRC = Labeled Value
EXTERIOR SHADING DETAILS
ID
Window
Exterior Shade Type SHGC H t Wd
Ove hang Left Fin Right Fin
Len H t LExt RExt Dist Len H t Dist Len H t
1
None
1.00
2
None
1.00
3
Bug Screen
0.76
4
Bug Screen
0.76
5
Bug Screen
0.76
6
Bug Screen
0.76
7
Bug Screen
0.76
8
None
1.00
9
Bug Screen
0.76
10
Bug Screen
0.76
11
Bug Screen
0.76
12
Buq Screen
0.76
EnergyPro
5.1 by Ener Soft User Number: 1005 Run Code: 2014-03-06T13:53:23 ID. 0307SAV
Pa e 7 of 12
CERTIFICATE OF COMPLIANCE: Residential (Part 5 of 5)
CF -1 R
Project Name
Savale Residence (Ex + Add)
Building Type m Single Family ❑ Addition AloneDate
❑ Multi Family 10Existing+ Addition/Alteration
3/6/2014
BUILDING ZONE INFORMATION
Floor Area ft
System Name Zone Name New Existing Altered Removed Volume
Year Built
HVAC Existing Area 1,196
9,568 1960
Addition 743
5,944
Totals 7431 1,1961 01 0i
i
HVAC SYSTEMS
System Name Qty. Heating Type Min. Eff. Cooling Type Min. Eff. Thermostat Type
Status
HVAC 1 Central Furnace 78% AFUE No Cooling 13.0 SEER Setback
Existing
HVAC DISTRIBUTION
Duct
System Name Heating Cooling Duct Location R -Value
Ducts
Tested? Status
HVAC Ducted Ducted Attic, Ceiling Ins, vented 2.1
❑
Existing
WATER HEATING SYSTEMS
S stem Name
Qty
Type
Distribution
Rated
Input
Btuh
Tank
Cap.
al
Energy
Factor
or RE
Standby
Loss or
Pilot
Ext.
Tank
Insul. R-
Value
Status
Tankless Gas
1
Instant Gas
No Pipe Insulation
199,000
0
0.82
n/a
n/a
Altered
Standard Gas 50 gal or Le
1
Small Gas
pre -altered for Above
40,000
50
0.58
n/a
n/a
MULTI -FAMILY WATER
HEATING
DETAILS
HYDRONIC
HEATING
SYSTEM
PIPING
Control
Hot Water Piping Length
ft
0
0
iz
a N Pipe
Q c
System Name
Length
Pipe
Diameter
Insul.
Thick.
Qty.
HP
Plenum Outside Buried
❑
Ener Pro 5.1 by Ener Soft User Number: 1005 RunCode: 201403-06713:53:23 ID: 0307SAV
Page 8 of 12
MANDATORY MEASURES SUMMARY: Residential Pae 1 of 3 MF -1 R
Project Name
Savale Residence (Ex + Add)
Date
3/6/2014
NOTE: Low-rise residential buildings subject to the Standards must comply with all applicable mandatory measures listed, regardless of
the compliance approach used. More stringent energy measures listed on the Certificate of Compliance (CF -1 R, CF -1 R -ADD, or CF -
1 R -ALT Form) shall supersede the items marked with an asterisk (*) below. This Mandatory Measures Summary shall be incorporated
into the permit documents, and the applicable features shall be considered by all parties as minimum component performance
specifications whether they are shown elsewhere in the documents or in this summary. Submit all applicable sections of the MF -1 R
Form with plans.
Building Envelope Measures:
116(a)l: Doors and windows between conditioned and unconditioned spaces are manufactured to limit air leakage.
§116(a)4: Fenestration products (except field -fabricated windows) have a label listing the certified U -Factor, certified Solar Heat Gain
Coefficient SHGC and infiltration that meets the requirements of 10-111 (a).
117: Exterior doors and windows are weather-stripped; all joints and penetrations are caulked and sealed.
118(a): Insulation specified or installed meets Standards for Insulating Material. Indicate type and include on CF -6R Form.
§118(i): The thermal emittance and solar reflectance values of the cool roofing material meets the requirements of §118(i) when the
installation of a Cool Roof is specified on the CF -1 R Form.
*§1 50 a : Minimum R-19 insulation in wood -frame ceiling orequivalent U -factor.
150(b): Loose fill insulation shall conform with manufacturer's installed design labeled R -Value.
*§1 50 c : Minimum R-13 insulation in wood -frame wall orequivalent U -factor.
*§1 50 d : Minimum R-13 insulation in raised wood -frame floor orequivalent U -factor.
150(f): Air retarding wrap is tested, labeled, and installed according to ASTM E1677-95 2000 when specified on the CF -1 R Form.
150 : Mandatory Vapor barrier installed in Climate Zones 14 or 16.
§150(1): Water absorption rate for slab edge insulation material alone without facings is no greater than 0.3%; water vapor permeance
rate is no greater than 2.0perm/inch and shall be protected from physical damage and UV light deterioration.
Fireplaces, Decorative Gas Appliances and Gas Log Measures:
150 e 1 A: Masonry or factory -built fireplaces have a closable metal or glass door covering the entire opening of the firebox.
§150(e)1 B: Masonry or factory -built fireplaces have a combustion outside air intake, which is at least six square inches in area and is
equipped with a with a readily accessible, operable, and tight -fitting damper and or a combustion -air control device.
§150(e)2: Continuous burning pilot lights and the use of indoor air for cooling a firebox jacket, when that indoor air is vented to the
outside of the building,are prohibited.
Space Conditioning, Water Heating and Plumbing System Measures:
§110-§113: HVAC equipment, water heaters, showerheads, faucets and all other regulated appliances are certified by the Energy
Commission.
§113(c)5: Water heating recirculation loops serving multiple dwelling units and High -Rise residential occupancies meet the air release
valve backflow prevention, pump isolation valve and recirculation loop connection requirements of §113(c)5.
§115: Continuously burning pilot lights are prohibited for natural gas: fan -type central furnaces, household cooking appliances
(appliances with an electrical supply voltage connection with pilot lights that consume less than 150 Btu/hr are exempt), and pool and
spa heaters.
150(h): Heating and/or cooling loads are calculated in accordance with ASHRAE, SMACNA or ACCA.
§1500): Heating systems are equipped with thermostats that meet the setback requirements of Section 112(c).
§1500)1 A: Storage gas water heaters rated with an Energy Factor no greater than the federal minimal standard are externally wrapped
with insulation having an installed thermal resistance of R-12 or greater.
§1500)1 B: Unfired storage tanks, such as storage tanks or backup tanks for solar water -heating system, or other indirect hot water
tanks have R-12 external insulation or R-16 internal insulation where the internal insulation R -value is indicated on the exterior of the
tank.
§1500)2: First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and entire length of
recirculating sections of hot water pipes are insulated per Standards Table 150-B.
§1500)2: Cooling system piping (suction, chilled water, or brine lines),and piping insulated between heating source and indirect hot
water tank shall be insulated to Table 150-B and Equation 150-A.
§1500)2: Pipe insulation for steam hydronic heating systems or hot water systems >15 psi, meets the requirements of Standards Table
123-A.
150(j)3A: Insulation is protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind.
§1500)3A: Insulation for chilled water piping and refrigerant suction lines includes a vapor retardant or is enclosed entirely in
conditioned space.
150(j)4: Solar water -heating systems and/or collectors are certified by the Solar Rating and Certification Corporation.
EnergyPro 5.1 by EnergySoft User Number: 1005 RunCode: 2014-03-06T13:53:23 ID: 0307SAV Page 9 of 12
MANDATORY MEASURES SUMMARY: Residential (Page 2 of 3 MF -1 R
Project Name
Date
1
Savale Residence (Ex + Add)
3/6/2014
§150(m)1: All air -distribution system ducts and plenums installed, are sealed and insulated to meet the requirements of CMC Sections
601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-
4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape or other duct -closure system that meets the
applicable requirements of UL 181, UL 181 A, or UL 181 B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is
used to seal openings reater than 1/4 inch, the combination of mastic and either mesh or tape shall be used
§150(m)1: Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed
sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may
contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area
of the ducts.
§150(m)2D: Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes
unless such tape is used in combination with mastic and draw bands.
150(m)7: Exhaust fans stems have back draft or automatic dampers.
§150(m)8: Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated
dampers.
§150(m)9: Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind.
Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar
radiation that can cause degradation of the material.
150 m 10: Flexible ducts cannot have porous inner cores.
§150(o): All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2-2007 Ventilation and Acceptable Indoor Air
Quality in Low -Rise Residential Buildings. Window operation is not a permissible method of providing the Whole Building Ventilation
required in Section 4 of that Standard.
Pool and Spa Heating Systems and Equipment Measures:
§114(a): Any pool or spa heating system shall be certified to have: a thermal efficiency that complies with the Appliance Efficiency
Regulations; an on-off switch mounted outside of the heater; a permanent weatherproof plate or card with operating instructions; and
shall not use electric resistance heating ora pilot light.
§114(b)1: Any pool or spa heating equipment shall be installed with at least 36" of pipe between filter and heater, or dedicated suction
and return lines, or built-up connections for future solar heating.
114(b)2: Outdoor pools ors as that have a heat pump or gas heater shall have a cover.
§114(b)3: Pools shall have directional inlets that adequately mix the pool water, and a time switch that will allow all pumps to be set or
programmed to run only during off-peak electric demand periods.
150 : Residential pool systems orequipment meet the pump sizing, flow rate, piping, filters, and valve requirements of §150
Residential Lighting Measures:
§150(k)1: High efficacy luminaires or LED Light Engine with Integral Heat Sink has an efficacy that is no lower than the efficacies
contained in Table 150-C and is not a low efficacy luminaire asspecified by §150(k)2.
150(k)3: The wattage of permanently installed luminaires shall be determined asspecified by §130(d).
§150(k)4: Ballasts for fluorescent lamps rated 13 Watts or greater shall be electronic and shall have an output frequency no less than
20 kHz.
§150(k)5: Permanently installed night lights and night lights integral to a permanently installed luminaire or exhaust fan shall contain
only high efficacy lamps meeting the minimum efficacies contained in Table 150-C and shall not contain a line -voltage socket or line -
voltage lamp holder; OR shall be rated to consume no more than five watts of power as determined by §130(d), and shall not contain a
medium screw -base socket.
150(k)6: Lighting integral to exhaust fans, in rooms other than kitchens, shall meet the applicable requirements of §150(k).
150(k)7: All switching devices and controls shall meet the requirements of §150(k)7.
§150(k)8: A minimum of 50 percent of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy.
EXCEPTION: Up to 50 watts for dwelling units less than or equal to 2,500 ft2 or 100 watts for dwelling units larger than 2,500 ft2 may be
exempt from the 50% high efficacy requirement when: all low efficacy luminaires in the kitchen are controlled by a manual on occupant
sensor, dimmer, energy management system (EMCS), or a multi -scene programmable control system; and all permanently installed
luminaries in garages, laundry rooms, closets greater than 70 square feet, and utility rooms are high efficacy and controlled by a
manual -on occupant sensor.
§150(k)9: Permanently installed lighting that is internal to cabinets shall use no more than 20 watts of power per linear foot of
illuminated cabinet.
EnergyPro 5.1 by EnergySoff User Number: 1005 RunCode: 2 014-03-0 6 713:53:23 ID: 0307SAV Page 10 of 12
MANDATORY MEASURES SUMMARY: Residential (Page 3 of 3 MF -1 R
Project Name
Date
Savale Residence (Ex + Add)
3/6/2014
§150(k)10: Permanently installed luminaires in bathrooms, attached and detached garages, laundry rooms, closets and utility rooms
shall be high efficacy.
EXCEPTION 1: Permanently installed low efficacy luminaires shall be allowed provided that they are controlled by a manual -on
occupant sensor certified to comply with the applicable requirements of §119.
EXCEPTION 2: Permanently installed low efficacy luminaires in closets less than 70 square feet are not required to be controlled by a
manual -on occupancy sensor.
§150(k)11: Permanently installed luminaires located in rooms or areas other than in kitchens, bathrooms, garages, laundry rooms,
closets, and utility rooms shall be high efficacy luimnaires. EXCEPTION 1: Permanently installed low efficacy luminaires shall be
allowed provided they are controlled by either a dimmer switch that complies with the applicable requirements of §119, or by a manual -
on occupant sensor that complies with the applicable requirements of §119. EXCEPTION 2: Lighting in detached storage building less
than 1000 square feet located on a residential site is not required to comply with §150 k 11.
§150(k)12: Luminaires recessed into insulated ceilings shall be listed for zero clearance insulation contact (IC) by Underwriters
Laboratories or other nationally recognized testing/rating laboratory; and have a label that certifies the lumiunaire is airtight with air
leakage less then 2.0 CFM at 75 Pascals when tested in accordance with ASTM E283; and be sealed with a gasket or caulk between
the luminaire housing and ceiling.
§150(k)13: Luminaires providing outdoor lighting, including lighting for private patios in low-rise residential buildings with four or more
dwelling units, entrances, balconies, and porches, which are permanently mounted to a residential building or to other buildings on the
same lot shall be high efficacy. EXCEPTION 1: Permanently installed outdoor low efficacy luminaires shall be allowed provided that
they are controlled by a manual on/off switch, a motion sensor not having an override or bypass switch that disables the motion sensor,
and one of the following controls: a photocontrol not having an override or bypass switch that disables the photocontrol; OR an
astronomical time clock not having an override or bypass switch that disables the astronomical time clock; OR an energy management
control system (EMCS) not having an override or bypass switch that allows the luminaire to be always on EXCEPTION 2: Outdoor
luminaires used to comply with Exceptions to §150(k)13 may be controlled by a temporary override switch which bypasses the motion
sensing function provided that the motion sensor is automatically reactivated within six hours. EXCEPTION 3: Permanently installed
luminaires in or around swimming pool, water features, or other location subject to Article 680 of the California Electric Code need not
be high efficacy luminaires.
§150(k)14: Internally illuminated address signs shall comply with Section 148; OR not contain a screw -base socket, and consume no
more than five watts of power as determined according to §130(d).
§150(k)15: Lighting for parking lots and carports with a total of for 8 or more vehicles per site shall comply with the applicable
requirements in Sections 130, 132, 134, and 147. Lighting for parking garages for 8 or more vehicles shall comply with the applicable
requirements of Sections 130, 131, 134, and 146.
§150(k)16: Permanently installed lighting in the enclosed, non -dwelling spaces of low-rise residential buildings with four or more
dwelling units shall be high efficacy luminaires. EXCEPTION: Permanently installed low efficacy luminaires shall be allowed provided
that they are controlled by an occupant sensors certified to comply with the applicable requirements of 119.
EnergyPro 5.1 by EnergySoff User Number: 1005 RunCode: 2014-03-06T13:53:23 ID: 0307SAV Page 11 of 12
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
Savale Residence (Ex + Add)
Date
3/6/2014
System Name
HVAC
Floor Area
1,939
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
1
COIL
CFM
Total Room Loads 1,322
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 54
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING
PEAK COIL HTG.
PEAK
Heating System
Sensible
Latent CFM
Sensible
Output per System 75,000
27,293
1,117 972
35,243
Total Output Btuh 75,000
0
Output Btuh/ ft 38.7
2,233
3,607
Cooling System
0
0
Output per System 0
706
377 54
2,357
Total Output Btuh 0
0
11493
0
Total Output ons 0.0
2,233
3,607
Total Output Btuh/s ft) 0.0
Total Output s ftfron 0.0
1 32,464
44,814
Air System
CFM per System
2,500
HVAC EQUIPMENT SELECTION
Airflow cfm
2,500
Existing FAU 0
0
75,000
Airflow cfm/s ft
1.29
Airflow cfm/Ton
0.0
Outside Air %/0
2.2%
Total Adjusted System Output 0 0
(Adjusted for Peak Design conditions)
1 TIME OF SYSTEM PEAK Aug 3 PM
75,000
Jan 1 AM
Outside Air cfm/S ft) 0.03
Note: values above given at ARI conditions
HEATING SYSTEM PSYCHROMETRICS
(Airstream Temperatures at Time of Heating Peak
28 IF 68 IF 68 OF 105 'F
Outside Air
54 cfm Supply Fan Heating Coil
2,500 cfm
69 IF
fl
104 °F
ROOM
70 OF
COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak)
88/68°F 76/62°F 76/62°F 55/54°F
Outside Air
54 cfm Supply Fan Cooling Coil
2,500 cfm
45.7%
76 / 62 IF
56 / 54 OF
ROOM
75 / 61 IF
EnergyPro 5.1 by EnergySoff
User Number: 1005 RunCode: 2014-03-06T13:53:23 ID: 0307SAV
Page 12 of12