HomeMy WebLinkAboutAH Packet 11-10-2016 CITY OF CUPERTINO
AGENDA
�u P��T i N o ADMINISTRATIVE HEARING
10300 Torre Avenue, City Hall Conference Room C
Thursday, November 10, 2016
5:00 PM
ROLL CALL
APPROVAL OF MINUTES
1. Sub.�ect: Draft Minutes of October 13, 2016
Recommended Action: Approve or modify the Draft Minutes of October 13, 2016
Draft Minutes of October 13, 2016
ORAL COMMUNICATIONS
This portion of the �neeting is reserved fo� persons wishing to address the members on
any matter not on the agenda. Speakers are li�nited to three (3) minutes. In most cases,
State law will p�ohibit the council f�om making any decisions with respect to a matteN
not listed on the agenda
WRITTEN COMMUNICATIONS
PUBLIC HEARING ITEMS
2. Subject: Architectural and Site improvements and Tree Removal to consider
allowing slope stabilization, retrofit of existing stairs and retaining wall, new
concrete decks and the removal and replacement of one (1) protected tree.
Application No(s).: ASA-2016-08, TR-2016-43; Applicant(s): Salvatore Caruso
(Ramona Blvd, Inc); Location: 22825 San Juan Road APN: 342-22-109)
Recommended Action: Approve the applications per the draft resolutions
Staff Report
1 -Draft Resolution ASA-2016-08
2 -Draft Resolution TR-2016-43
3 -Plan Set
3. Subject: Architectural and Site improvements and Tree Removal to consider
allowing parking lot modifications to increase parking supply, improve
landscaping, and the removal and replacement of 21 development (protected)
ClTY OF CUPERTINO Page I
Administrative Hearing AGENDA November 10,2016
trees. Application No(s).: ASA-2016-13, TR-2016-35; Applicant(s): Jeff
Oparowski (19900 Stevens Creek Blvd, LLC); Location: 19900 Stevens Creek
Boulevard APN: 369-OS-038)
Recommended Action: Approve the applications per the draft resolutions
Staff Report
1 -Draft Resolution ASA-2016-13
2 -Draft Resolution TR-2016-35
3 -Plan Set
NEW BUSINESS
OLD BUSINESS
ADJOURNMENT
In compliance with the Americans with Disabilities Act (ADA), anyone who is planning
to attend the next meeting who is visually or hearing impaired or has any disability that
needs special assistance should call the City Clerk's Office at 408-777-3223, 48 hours
in advance of the meeting to a�range for assistance. Upon request, in advance, by a
person with a disability, meeting agendas and writings distributed fo� the meeting that
are public records will be made available in the appropriate alternative forinat. Also
upon request, in advance, an assistive listening device can be fnade available for use
during the meeting.
MembeNs of the public a�e entitled to addNess the membe�s concerning any item that is
described in the notice or agenda for this meeting, before or during consideration of
that item. If you wish to address the membe�^s on any other item not on the agenda, you
may do so during the public comment portion of the meeting. Please limit you�
comments to th�ee (3) minutes or less.
ClTY OF CUPERTINO Page 2
Cupertino, CA 95014
(408) 777-3308
ACTION MINUTES OF THE REGULAR MEETING OF
THE ADMINISTRATIVE HEARING HELD ON October 13, 2016
ROLL CALL
Hearing Officer present: Benjamin Fu, Assist. Director of Community Development
Staff present: Ellen Yau, Assistant Planner
Applicant(s) present: Shijer and Fong Mei, homeowners
APPROVAL OF MINUTES:
1. Minutes of September 8, 2016
The minutes of September 8, 2016 were approved as written
POSTPONEMENTS/REMOVAL FROM CALENDAR:
None
ORAL COMMUNICATION:
None
WRITTEN COMMUNICATIONS:
None
PUBLIC MEETING:
2. Application No.(s): INT-2016-01
Applicant: Shijer and Fong Mei
Location: 1070 Colony Hills Ln APN#s: 359-28-012
Interpretation to designate the property line along Colony Hills Lane as the front lot line to
allow for a 1,114 square foot addition to an existing single story residence.
Administrative Hearing decision final unless appealed.
2 Administrative Hearing
October 13, 2016
Staff Member Yau stated that the property was annexed into Cupertino from the City of San
Jose in 1979. At that time, the front lot line was along Colony Hills Lane. The City of Cupertino
requires that the shorter of the two property lines for a corner lot be designated at the front lot
line. In this case, that is Tip Toe Lane. The City pf Cupertino's R1 Ordinance allows the
flexibility for an interpretation of a front lot line based upon prior design patterns. The
applicant is requesting a change on the lot line designation in order to accommodate an
addition to his home. In 2003, a front yard interpretation was granted to this property, but the
entitlement was not acted upon and so has since expired. Staff has reviewed the current
submitted project and has no objections to granting another interpretation for the front lot line.
If the front yard interpretation is not granted, the addition will be non-conforming per the City
of Cupertino's Ordinance and would be at odds with the rest of the neighborhood
development that was done under the City of San Jose's regulations.
The Hearing Officer confirmed that the current proposal is the same as the prior proposal.
And that with this change in the front lot line designation, the proposed addition will meet all
of the City's Ordinance requirements regarding massing, setbacks and parking. Staff inember
Yau confirmed. The Hearing Officer asked if the current fence would be impacted by the
addition. Staff inember Yau explained that the existing fence meets the Fence Ordinance. The
fence will be lengthened, and that additional section will also be in compliance. He had no
further questions.
The Hearing Officer opened the item for Public Comment.
A neighbor, Bill Preetz, asked for clarification of the setback along the Tip Toe property line.
Staff inember Yau stated that it was 13'- 5" and that the requirement is 12' if the lot line
interpretation is granted.
There were no other speakers, so the Public Comment period was closed.
The Hearing Officer agreed that the proposed project was not different from the prior
approval and posed no conflicts with the current regulations.
DECISION: The application was approved per the draft resolution
ADJOURNMENT
Respectfully submitted:
/s/Beth Ebben
Beth Ebben
Administrative Assistant
g.planning/AH Committee/Minutes101316
OFFICE OF COMMUNITY DEVELOPMENT
PLANNING DIVISION
CITY HALL
10300 TORRE AVENUE•CUPERTINO, CA 95014-3255
(408)777-3308• FAX(408)777-3333
CUPERTII'�10
ADMINISTRATIVE HEARING STAFF REPORT
Agenda Date:November 10,2016
SUBJECT
Architectural and Site improvements and Tree Removal to consider allowing slope stabilization,
retrofit of existing stairs and retaining wall,new concrete decks and the removal and replacement
of one (1) protected tree. (Application No(s).: ASA-2016-08, TR-2016-43; Applicant(s): Salvatore
Caruso (Ramona Blvd. Inc);Location: 22825 San Juan Road APN: 342-22-109)
RECOMMENDATION
Staff recommends that the Hearing Officer approve the Architectural and Site Approval (ASA-
2016-08) and Tree Removal Permit (TR-2016-43)per the draft resolutions (Attachments 1 and 2).
DISCUSSION:
Application Summary:
1. Architectural and Site Approval (ASA-2016-08) for retrofit of an existing retaining wall
at the parking lot and stairs to the lower level, and new concrete decks.
2. Tree Removal Permit (TR-2016-43) to allow the removal and replacement of one (1)
protected tree.
Project Data:
General Plan Designation: Quasi-Public/Institutional
Special Planning Area: Ins iration Hei hts S ecial Planning Area
Zoning Designation: Quasi—Public Buildin (BQ)
Project Consistency with:
General Plan: Yes
Zoning: Yes
Environmental Assessment: Categorical Exemption
Background:
In the early 1970's, the Marianists developed a religious retreat and retirement facility under
County jurisdiction on hillside property located at 22825 San Juan Road and 22840 Mercedes
ASA-2016-08,TR-2016-43 22825 San Juan Road November 10, 2016
Road. The property was subsequently ��,;An.s�„� .,� . �` �' ,��� ,�1,
annexed by the City of Cupertino. The � ,,"� �,'� ,� ���_ �; ' � � � �3� ""'���*-.�s
site is zoned Quasi-Public Building 'Y������.�,"`':''� � �, e�V� . , ,�°`'t�;�,'���' ,
g \ `� ~ •� k+,�� , �,.,� � �,,� �
� QJ' � . � � �}4� ,�t,�� � � t i `���� K i � �
't �r�r��,, ��.: `,�,.,�{ � K� '�; ; 3�•�y� �,` `� '4'1
a r� � , u� :�t ?. ' �
� '��'�kyy�, ��..,.;I }�1r"r �� 'L`i
a r �, �-'�'S �,
The develo ment consists of an u er � �'��+�' � ''�, '�.� ,. '�+ . t '� , ' � a:
p pp �,.,,�. , ,� � �,�,,• , �, �
building off San Juan Road that f , � �r �
� � '�'�, ,.�: Y�� 7��,,e. ,. �J� / � �
��.� �� �� ♦�'�`� �l �t�'�'� ";
k �+,. �r r • ; , ` �.�� �-��,•,��� ' ��
connects to a lower building located off �L�'�;.;;:►.�!�� .ir`� , i a � �. ,� �,' *.� '
Mercedes Road. Uses adjacent to the �:•i � `��7�;� t�`,M��;'�c��,`w•"��^'�';�,f,�:��'�';��` �t��• � i
� Q�r� ��� ,� � �� `�3F�.:.�y' � � �,�,,�,•'}�1� . ,"� i�,;�v
property include single family homes o r��.�} r,' ��p`�`��*;,�,�" t, ��,.� ,�, � ?„ �,� ,7
to the east and south, undeveloped ��y�•f � �� ,;��,�.�,t ' • ``r.-��' r' �j2'•� � � 'q�',1�
• .� Y �1 i Y�� '�
area m Santa Clara Count to the west, �'� � '��+' ;�•�'.� �, ,` ,��'��+• > .�.,�� �,�
y ,:i'.p�'�;`� �e , y 1. �.�tl.'_�. ��_:.
and water storage facilities to the north.
Figure 1: Project Location
Application requests
The applicant, representing the Ramona Blvd. Inc., is requesting approval to allow retrofit of an
existing retaining wall at the parking lot, stairs to the lower level, and new concrete decks at both
levels. The project also seeks a tree removal permit to allow the removal and replacement of one
protected tree (See Attachment 3.)
Tree Removal Permits may be approved by the Director of Community Development without a
public meeting. However, the zoning code requires concurrent review by the highest City body
that can approve a project, when applications are combined. In this case, since an Architectural
and Site Approval permit is also being requested, this permit must be reviewed at an
Administrative Hearing level.
Analysis:
Architectural £�t Site Approval
The applicant proposes to
make site modifications to � - - - �� --f4 � ,
prevent slope deterioration - � , ���"' � �
,.��,,.�> �,�Y` <, i`:s�'� �.
at the existin site. This • `°"°�^""'�-� ,
g , � �,k.�.,�,. ,,�,>, �
�.
includes making „, - ,.e •'w ,�,,;,;,, ,
modifications to an area „_ �r , �f'" ;�',> -"'"
' ��' ;, ` -
with existing stitch piers, , .„ . _ - ,
adding new stitch piers , "°'"r" ��� ':"°,l .'' `
,�-„���.
adjacent to the building and �' �'� � ��,T,� ' '`' ' •
_ ,�,,, .���:
.. . G.
grading much of the � ;�..,� ' ��`,�, ; _ --- �-
.�
northern slope. ' , `;�� „�„�
.,,.,.,,,,..�,r,.� , "'-,�I ; � ow�_., .� _
� k ; . , . .�_.. .. � �. � ,
:., �
«<s-�j1"1�.�
Figure 2: Site Plan
ASA-2016-08,TR-2016-43 22825 San Juan Road November 10, 2016
Parking Area and Upper Deck
The parking area will be widened by five (5) feet through the installation of a concrete deck
cantilevered over new dead man piers being installed behind the existing stitch piers in that area.
These deadman piers add additional stability to the slope. In addition, a shotcrete wall will be
installed to cover the exposed face of the existing stitch piers. In order to ensure safety, a four (4)
foot wrought iron railing is being installed and further, to prevent roll-away, a six (6) inch
concrete wheel stop will be installed at the edge. Any asphalt disturbed as a result of the slope
stability improvements will be replaced.
The existing wooden deck located adjacent to the building and between the parking area will be
removed and replaced with a new concrete deck.
Lower Deck
New concrete stairs will replace existing wooden stairs on the north-eastern corner of the
building,connecting the upper deck to an existing pathway located below.In addition,new stitch
piers will be added along the north edge of the building. The existing wooden deck on the north
side of the building(lower deck)will remain,but will be widened by approximately two-foot due
to the installation of a concrete grade beam capping the new stitch piers. In addition, to ensure
safety a 3'6" wrought iron railing is being added.
GradmQ
Per the recommendation of the applicant's geotechnical consultant and to aid in slope stability,
the applicant will regrade a portion of the site north of the parking lot to a 2:1 slope.
Tree Removal
The applicant proposes the removal of 19 trees to allow for the grading of the slope to increase
stability. Of the trees to be removed, only one, a 14-inch diameter at breast height (DBH) Coast
Live Oak tree, is considered protected and necessitates a tree removal permit. However, the
applicant proposes the replacement of all removed trees with 24-inch box trees of a similar
species. For the Protected tree, the applicant is required to plant two (2) 24-inch box trees.
NOTICING AND COMMUNITY OUTREACH
The following table is a brief summary of the noticing for this project:
Notice of public meeting Agenda
• Site signage(10 days prior to the hearing) • Posted on the City's official notice bulletin
• Notices mailed to property owners board (one week prior to the hearing)
adjacent to the project site (10 days • Posted on the City of Cupertino's Web site
prior to the hearing) (one week prior to the hearing)
No public comments were received at the time of staff report production.
ASA-2016-08,TR-2016-43 22825 San Juan Road November 10, 2016
PERMIT STREAMLINING ACT
This project is subject to the Permit Streamlining Act (Government Code Section 65920—65964).
The City has complied with the deadlines in the Permit Streamlining Act.
Project Received: May 26, 2016
Deemed Incomplete:June 23, 2016
Revisions Received:August 9, 2016
Deemed Incomplete:August 30, 2016
Revision Received:September 28, 2016
Deemed Complete:October 17, 2016
The City has 60 days (until December 17, 2016) to make a decision on the project.
ENVIRONMENTAL REVIEW
This project is categorically exempt from the requirements of the California Environmental
Quality Act (CEQA, Section 15301, Class 1, existing facilities).
CONCLUSION
Staff recommends approval of the Architectural and Site Approval and the Tree Removal Permit,
since the plans and conditions of approval address all concerns related to the proposed project.
Additionally all findings for approval of the proposed project,consistent with Chapter 19.168 and
Chapter 14.18 of the Cupertino Municipal Code,may be made as reflected in the Draft Resolution.
NEXT STEPS
Should the project be approved, the Hearing Officer's decision on this project is final unless an
appeal is filed within 14 calendar days of the date of the mailing of the decision. All approvals
granted by the Hearing Officer shall go into effect after 14 days.
Upon project approval, the applicant will be able to submit building permit drawings to enable
construction to commence. These approvals expire on November 10, 2018, at which time the
applicant may apply for a one-year extension.
Prepared by: Erick Serrano, Associate Planner
Reviewed and Submitted by: Piu Ghosh, Principal Planner
ATTACHMENTS
1. Draft Resolution ASA-2016-08
2. Draft Resolution TR-2016-43
3. Plan Set
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
DRAFT RESOLUTION
OF THE ADMINSTRAITVE HEARING MEETING OF THE CITY OF CUEPRTINO FOR AN
ARCHITECTURAL AND SITE APPROVAL(ASA-2016-08)TO ALLOW FOR A RETROFIT OF AN
EXISTING RETAIING WALL AT THE PARKING LOT AND STAIRS TO THE LOWER, AND NEW
CONCRETE DECKS IN A QUASI-PUSLIC BUILDING ZONE
SECTION I: PROTECT DESCRIPTION
Application No.: ASA-2016-08
Applicant: Salvatore Caruso (Ramon Blvd.Inc.)
Location: 22825 San Juan Road (APN: 342-22-109)
SECTION II: FINDINGS
WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an application
to allow an Architectural and Site Approval to allow for a retrofit of an existing retaining wall
the parking lot and stairs to the lower level, and new concrete decks in a Quasi-Public Building
Zone;
WHEREAS, the necessary public notices have been given as required by the Procedural
Ordinance of the City of Cupertino, and the Administrative Hearing Officer has held at least
one public meeting in regard to the application;and
WHEREAS, the applicant has met the burden of proof required to support said application; and
WHEREAS, the Administrative Hearing Officer finds:
1. The proposal, at the proposed location, will not be detrimental or injurious to property or
improvements in the vicinity, and will not be detrimental to the public health, safety,
general welfare, or convenience;
The project is not detrimental to the public health, safety, general welfare or convenience because the
applicant is proposing a modification to the existing site that aids in the stabilization of the slope of
the property, and minimizes future potential impacts.
2. The proposal is consistent with the purposes of Chapter 19.168, Architectural and Site
Review, of the Cupertino Municipal Code, the General Plan, any specific plan, zoning
ordinances, applicable planned development permit, conditional use permits, variances,
subdivision maps or other entitlements to use which regulate the subject property
including,but not limited to, adherence to the following specific criteria:
Draft Resolution ASA-2016-08 November 10, 2016
Page 2
a) Abrupt changes in building scale should be avoided. A gradual transition related to height
and bulk should be achieved between new and existing buildings;
The proposed project does not proposed modification to the existing building. Grading on the site will
result in the removal of existing trees, but trees will be replaced in similar locations. The replacements
and existing trees will aid in the screening of the proposed decks and stairs.
b) In order to preserve design harmony between new and existing buildings and in order to
preserve and enhance property values, the materials, textures and colors of new buildings
should harmonize with adjacent development by being consistent or compatible with design
and color schemes, and, with the future character of the neighborhood and purposes of the
zone in which they are situated. The location, height and materials of walls, fencing, hedges
and screen planting should harmonize with adjacent development. Unsightly storage areas,
utility installations and unsightly elements of parking lots should be concealed. The planting
of ground cover or various types of pavements should be used to prevent dust and erosion,
and the unnecessary destruction of existing healthy trees should be avoided. Lighting for
development should be adequate to meet safety requirements as specified by the engineering
and building departments, and provide shielding to prevent spill-over light to adjoining
property owners;
No new buildings are proposed with the project. Existing and new plantings will aid in screening the
new concrete decks and railings. No new lighting is proposed with the project.
c) The number, location, color, size, height, lighting and landscaping of outdoor advertising
signs and structures shall minimize traffic hazards and shall positively affect the general
appearance of the neighborhood and harmonize with adjacent development; and
No signage or outdoor advertising is proposed by the project.
d) With respect to new projects within existing residential neighborhoods, new development
should be designed to protect residents from noise, traffic, light and visually intrusive effects
by use of buffering, setbacks, landscaping, walls and other appropriate design measures.
The project is located in a Quasi-Public Building Zone, but is partially surrounded by residential
neighborhoods. The project will screen views to adjacent properties by utilizing existing and new
plantings on site. There is no change in the use, so there are no expected traffic or noise impacts. The
project proposes no new lighting. Visually intrusive effects have been minimized by limiting the
amount of grading and development to the affected area, and using existing and proposed trees to
screen the area.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted
in this matter, subject to the conditions which are enumerated in Section III and IV of this
Draft Resolution ASA-2016-08 November 10, 2016
Page 3
Resolution beginning on Page 3 thereof, the Application No. ASA-2016-08 is hereby approved;
and that the sub-conclusions upon which the findings and conditions specified in this Resolution
are based and contained in the public meeting record concerning Application ASA-2016-08 as set
forth in the Minutes of the Administrative Hearing Meeting of November 10, 2016, and are
incorporated by reference as though fully set forth herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT
DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the plan set entitled "Our Lady of Santa Clara" consisting of
twenty-one (21) sheets labeled as A0.1-A0.3, A1.2-A1.4, S1.0, S2.1, S3.1, S5.1-S5.6, and
C1.0-05.0 drawn by SCDC Architecture Interior Design, dated received September 28,
except as may be amended by conditions in this resolution.
2. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data including
but not limited to property boundary locations, building setbacks, property size, building
square footage, any relevant easements and/or construction records. Any misrepresentation
of any property data may invalidate this approval and may require additional review.
3. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the
first page of the building plans.
4. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file no. TR-2016-43 shall be applicable to this
approval.
3. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with regard
to the proposed project for additional conditions and requirements. Any misrepresentation
of any submitted data may invalidate an approval by the Community Development
Department.
4. INDEMNIFICATION
Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the
City, its City Council, and its officers, employees and agents (collectively, the "indemnified
parties") from and against any claim, action, or proceeding brought by a third party
against one or more of the indemnified parties or one or more of the indemnified
parties and the applicant to attack, set aside, or void this Resolution or any permit or
approval authorized hereby for the project, including (without limitation) reimbursing the
City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant
shall pay such attorneys' fees and costs within 30 days following receipt of invoices from
Draft Resolution ASA-2016-08 November 10, 2016
Page 4
City. Such attorneys' fees and costs shall include amounts paid to counsel not otherwise
employed as City staff and shall include City Attorney time and overhead costs and other
City staff overhead costs and any costs directly related to the litigation reasonably incurred
by City.
5. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees, dedication
requirements, reservation requirements, and other exactions. Pursuant to Government
Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the
amount of such fees, and a description of the dedications, reservations, and other exactions.
You are hereby further notified that the 90-day approval period in which you may protest
these fees, dedications, reservations, and other exactions, pursuant to Government Code
Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying
with all of the requirements of Section 66020, you will be legally barred from later
challenging such exactions.
SECTION IV: CONDITIONS ADMINSTERED BY THE PUBLIC WORKS DEPARTMENT
6. GRADING AND DRAINAGE
Grading shall be as approved and required by the City Engineer in accordance with Chapter
16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits maybe required.
Additional comments pertaining to grading, drainage, retaining wall design will be
provided as part of Suilding Permit review process.
7. FEES AND BOND
The project developer will be subject to payment of the following fees and bond, including
but not limited to checking and inspection fees, storm drain fees, and fees for under
grounding of utilities. Said agreement shall be executed prior to issuance of construction
permits
Fees:
a. Checking& Inspection Fees: $Per current fee schedule ($655)
b. Grading Permit: $Per current fee schedule ($2,618 or 6%)
c. Storm Drainage Fee: $976
d. 3ra Party Reviews: To be Determined
Bonds:
On-site Grading Bond: 100% of site improvements.
-The fees described above are imposed based upon the current fee schedule adopted by the
City Council. However, the fees imposed herein may be modified at the time of recordation
Draft Resolution ASA-2016-08 November 10, 2016
Page 5
of a final map or issuance of a building permit in the event of said change or changes, the
fees changed at that time will reflect the then current fee schedule.
8. BEST MANAGEMENT PRACTICES
Utilize Best Management Practices (BMPs), as required by the State Water Resources
Control Board, for construction activity, which disturbs soil. BMP plans shall be included in
grading and street improvement plans.
9. NPDES CONSTRUCTION GENERAL PERMIT
When and where it is required by the State Water Resources Control Board (SWRCB), the
developer must obtain a Notice of Intent (NOI) from the SWRCB, which encompasses
preparation of a Storm Water Pollution Prevention Plan (SWPPP), use of construction Best
Management Practices (BMPs) to control storm water runoff quality, and BMP inspection
and maintenance.
10. EROSION CONTROL PLAN
Developer shall must provide an approved erosion control plan by a Registered Civil
Engineer. This plan should include all erosion control measures used to retain materials on
site. Erosion control notes shall be stated on the plans.
WORK SCHEDULE
Every 6 months, the developer shall submit a work schedule to the City to show the
timetable for all grading/erosion control work in conjunction with this project.
11. SANTA CLARA COUNTY FIRE DEPARTMENT
A letter of clearance for the project shall be obtained from the Santa Clara County Fire
Department prior to issuance of building permits. Clearance should include written
approval of the location of any proposed Fire Backflow Preventers, Fire Department
Connections and Fire Hydrants (typically Backflow Preventers should be located on private
property adjacent to the public right of way, and fire department connections must be
located within 100' of a Fire Hydrant).
12. SAN TOSE WATER COMPANY CLEARANCE
13. Provide San Jose Water Company approval for water connection, service capability and
location and layout of water lines and backflow preventers before issuance of a building
permit approval.
14. DEDICATION OF UNDERGROUND WATER RIGHTS
Developer shall "quit claim" to the City all rights to pump, take or otherwise extract water
from the underground basin or any underground strata in the Santa Clara Valley.
Draft Resolution ASA-2016-08 November 10, 2016
Page 6
15. SANITARY DISTRICT
A letter of clearance for the project shall be obtained from the Cupertino Sanitary District
prior to issuance of building permits.
PASSED AND ADOPTED this 10th day of November, 2016 at a noticed Public Meeting of the
Administrative Hearing Officer of the City of Cupertino, State of California, held by the
Director of Community Development, or his or her designee, pursuant to Cupertino Municipal
Code Section 19.12.120.
ATTEST: APPROVED:
Erick Serrano Benjamin Fu
Associate Planner Asst. Director of Community Development
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
DRAFT RESOLUTION
OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO TO
ALLOW THE REMOVAL AND REPLACEMENT OF ONE FOURTEEN INCH
DIAMETER AT BREAST HEIGHT COAST LIVE OAK AT AN EXISTING QUASI-
PUBLIC FACILITY
SECTION I: PROJECT DESCRIPTION
Application No.: TR-2016-43
Applicant: Salvatore Caruso (Ramon Blvd.Inc.)
Location: 22825 San Juan Road (APN: 342-22-109)
SECTION II: FINDINGS
WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an application
for a Tree Removal Permit as described in Section I. of this Resolution; and
WHEREAS, the project is categorically exempt from the California Environmental Quality Act
(CEQA);
WHEREAS, the necessary public notices have been given as required by the Procedural
Ordinance of the City of Cupertino, and the Administrative Hearing Officer held a public
meeting on November 10, 2016 in regard to the application; and
WHEREAS, the Administrative Hearing Officer finds:
1. That the location of the trees restricts the economic enjoyment of the property by severely
limiting the use of property in a manner not typically experienced by owners of similarly
zoned and situated property, and the applicant has demonstrated to the satisfaction of the
approval authority that there are no reasonable alternatives to preserve the tree(s).
The trees are located on the northern slope of the property that needs to be graded to ensure improved
slope stability. As a result several trees included one 14"_Diameter at Breast Height (DBH)
Protected Coast Live Oak tree needs to be removed. However, these trees will be replaced with 24-inch
box trees of a similar species upon completion of the grading.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of the maps, facts, exhibits, testimony and other evidence
submitted in this matter, subject to the conditions which are enumerated in this Resolution
Draft Resolution TR-2016-43 November 10,2016
Page 2
beginning on PAGE 2 thereof, the application for Tree Removal, Application no. TR-2016-43, is
hereby approved; and
That the subconclusions upon which the findings and conditions specified in this Resolution are
based and contained in the Public Meeting record concerning Application no.(s) TR-2016-43 as
set forth in the Minutes of Administrative Hearing Meeting of November 10, 2016, and are
incorporated by reference as though fully set forth herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT
DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the plan set entitled "Our Lady of Santa Clara" consisting of
twenty-one (21) sheets labeled as A0.1-A0.3, A1.2-A1.4, S1.0, S2.1, S3.1, S5.1-S5.6, and
C1.0-05.0 drawn by SCDC Architecture Interior Design, dated received September 28,
except as may be amended by conditions in this resolution.
2. ACCURACY OF PROjECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks, property
size, building square footage, any relevant easements and/or construction records. Any
misrepresentation of any property data may invalidate this approval and may require
additional review.
3. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the first
page of the building plans.
4. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file no. ASA-2016-08 shall be applicable to this
approval.
5. TREE REPLACEMENT
The applicant shall provide adequate tree replacements for trees proposed to be
removed in conjunction with the proposed project. If it is determined that it is physically
not feasible to plan the required replacements trees, the Applicant may pay in-lieu fees
determined to be appropriate by the Community Development Director. The
replacement trees shall be planted prior to building permit final. The Applicant shall
provide the Department of Community Development adequate documentation,
including, but not limited to, photographs, receipts or invoices, to verify that
replacements have been planted.
6. PROTECTED TREES
The Applicant understands that the replacement trees may not be removed without a
Tree Removal Permit and that they shall be responsible for ensuring the proper
Draft Resolution TR-2016-43 November 10,2016
Page 3
maintenance and care of the trees. The applicant shall also disclose the location and
species of all replacements trees on site upon sale of the property.
7. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the Community
Development Department.
8. INDEMNIFICATION
Except as otherwise prohibited by law, the applicant shall indemnify and hold harmless the
City, its City Council, and its officers, employees and agents (collectively, the "indemnified
parties") from and against any claim, action, or proceeding brought by a third party
against one or more of the indemnified parties or one or more of the indemnified
parties and the applicant to attack, set aside, or void this Resolution or any permit or
approval authorized hereby for the project, including (without limitation) reimbursing the
City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant
shall pay such attorneys' fees and costs within 30 days following receipt of invoices from
City. Such attorneys' fees and costs shall include amounts paid to counsel not otherwise
employed as City staff and shall include City Attorney time and overhead costs and other
City staff overhead costs and any costs directly related to the litigation reasonably incurred
by City.
9. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees, dedication
requirements, reservation requirements, and other exactions. Pursuant to Government
Code Section 66020(d) (1), these Conditions constitute written notice of a statement of
the amount of such fees, and a description of the dedications, reservations, and other
exactions. You are hereby further notified that the 90-day approval period in which you
may protest these fees, dedications, reservations, and other exactions, pursuant to
Government Code Section 66020(a),has begun. If you fail to file a protest within this 90-
day period complying with all of the requirements of Section 66020, you will be legally
barred from later challenging such exactions.
Draft Resolution TR-2016-43 November 10,2016
Page 4
PASSED AND ADOPTED this 10th day of November, 2016 at a noticed Public Meeting of the
Administrative Hearing Officer of the City of Cupertino, State of California, held by the
Director of Community Development, or his or her designee, pursuant to Cupertino Municipal
Code Section 19.12.120.
ATTEST: APPROVED:
Erick Serrano Benjamin Fu
Associate Planner Assistant Director of Community Development
n nR
.
a ua oa o 0 0
u ertino D D
�
SAL�ATORE CARUSO
DESIGN CORPORATION
A P P L I C A B L E C 0 D E S S H E ET I N D E X 9so EL cAMr�o�AL,#200,sANTA cLA�,cA 9soso
TEL.Na (408)998-4087 � FAX,No.(408)998-4088
PART 1 .0, 2013 CALIFORNIA ADMINISTRATIVE CODE ARCHITECTURAL SHEETS
PART 2.0, 2013 CALIFORNIA BUILDING CODE CBC PROJECT DATA CONSULTANT :
� � A0.1 COVER SHEET
PART 2.5, 2013 CALIFORNIA RESIDENTIAL CODE (CRC)
PART 3.0, 2013 CALIFORNIA ELECTRIC CODE (CEC) PROPERTY APN N0. A0.2 GENERAL NOTES
PART 4.0, 2013 CALIFORNIA MECHANICAL CODE (CMC) A0.3 ABBREVIATIONS
PART 5.0, 2013 CALIFORNIA PLUMBING CODE GE> AREA 342-21 —020
PART 6.0, 2013 CALIFORNIA ENERGY CODE A1 .2 PROPOSED SITE PLAN
PART 9.0, 2013 CALIFORNIA FIRE CODE (WITH LOCAL AMENDMENTS) 342-22-070
PART 11 .0, 2013 CALIFORNIA GREEN BUILDING CODE (CALGREEN) A1 .3 PROPOSED STAIR DETAILS
342-22- 107
THE APPLICABLE CODES ARE AS AMENDED BY THE A1 .4 TREE REMOVAL P�AN
STATE OF CALIFORNIA AND THE CITY OF CUPERTINO.
STRUCTURAL
DESIGN PROFESSIONALS S1 .0 STRUCTURAL TITLE SHEET
ENGINEER:
ELEMENT STRUCTURAL ENGINEERS, INC S2.1 FOUNDATION PLAN
ARCHITECT: 39675 CEDAR BLVD SUITE 295C PROJECT :
SALVATORE CARUSO DESIGN CORPORATION NEWARK, CA 94560 S3.1 SECTIONS
980 EL CAMINO REAL, SUITE 200
SANTA CLARA, CA 95050 PHONE: (510) 573- 1557 S5.1 CONCRETE DETAILS
PHONE: (408) 998-4087 FAX: (973) 924-0663 Our Lad 0�
FAX: 408 998-4088 S5.2 CONCRETE DETAILS y
� �
S5.3 CONCRETE DETAILS Santa Clara
S5.4 CONCRETE DETAILS 22825 SANJUANROAD
S 5.5 C 0 N C R ETE D ETA I LS CUPERTINO,CA 95014
S5.6 CONCRETE DETAILS
CIVIL
GENERAL NOTES :
C� .O C OV E R S H E ET 1. THIS SHEEf IS PART OF A SEf & IS NOT TO BE USED ALONE.
2. THIS SHEEf IS NOT FOR CONSTRUCTION UNTIL THE ARCHfTECT'S STAMP
& SIGNATURE ARE ON THIS SHEEf
C 2.O G RA D I N G P LA N 3 ONETHIS PROJECTPONLY. RE RODUCT ON AND/ORH STRIBU ON WITHO TE
THE WRITTEN CONSENT Of THE ARCHITECT IS FORBIDDEN.
4. COPYRIGHT � BY SALVATORE CARUSO DESIGN CORP.
C2.1 CROSS SECTIONS
C3.0 EROSION CONTROL PLAN
SCO P E O � WO R K C4.0 CONSTRUCTION BEST MANAGEMENT PRACTICES
VOLUNTARY RETROFIT OF EXISTING RETAINING WALL AT THE PARKING LOT, AND C5.0 TOPOGRAPHIC SURVEY
STAIRS TO THE LOWER LEVEL.
SHEET NAME :
TITLE S H EET
PROPOSED SITE
REVISIONS BY
� PLANNING COMMENTS
:�
_. ,,... � _ �StCv=n�CreekMarkei
Ji,:�ly'cK�t[hr�n �
=t 25&an Juan fld
. Leh��re Bay Area __
L'imo end 5ecan� 4'�y
dr
DRAWN:
CHECKED:
DATE: 6/11/13
J SCALE: NTS
r_`�` JOB No.: 13.01.01
N SHEET No.:
VI C I N ITY MAP
AOe 1
SHEETS IN SET
pD D
1. ALL MATERIAL STORED ON THE SITE SHALL BE PROPERLY STACKED AND PROTECTED TO PREVENT DAMAGE AND DETERIORATION UNTIL USE. FAILURE TO PROTECT MATERIALS MAY BE CAUSE FOR NOTE #1: D D
REJECTION OF WORK. THE INTENT OF THESE DRAWINGS AND SPECIFICATIONS IS THAT THE WORK OF THE ALTERATION, REHABILITATION OR RECONSTRUCTION IS TO BE IN ACCORDANCE WITH TITLE 24, CALIFORNIA CODE OF
REGULATIONS. SHOULD ANY EXISTING CONDITIONS SUCH AS DETERIORATION OR NON-COMPLYING CONSTRUCTION BE DISCOVERED WHICH IS NOT COVERED BY THE CONTRACT DOCUMENTS WHEREIN THE
2. ALL CONSTRUCTION AND MATERIALS SHALL BE AS SPECIFIED AND/OR AS REQUIRED BY THE ADOPTED EDITION OF THE BUILDING CODE, ALL LOCAL AND NATIONAL CODES, AND AUTHORITIES WHICH ARE FINISHED WORK WILL NOT COMPLY WITH TITLE 24, CALIFORNIA CODE OF REGULATIONS, A CHANGE ORDER, OR A SEPARATED SEf OF PLANS AND SPECIFICATIONS, DEfAILING AND SPECIFYING THE SAL�ATORE CARUSO
APPLICABLE. REQUIRED WORK SHALL BE SUBMITI'ED TO AND APPROVED BY THE OFFICE BEFORE PROCEEDING WITH THE WORK.
3. ALL PRODUCTS, MATERIALS AND FINISHES TO BE INSTALLED PER MANUFACTURERS SPECIFICATIONS. 28. SWITCHES / CONTROLS / THERMOSTATS / ARE TO BE INSTALLED A MAX. OF 48" ABOVE THE FLOOR, AND ANY RECEPTACLE OUTLETS ARE TO BE INSTALLED AT LEAST 15" ABOVE THE FLOOR. DESIGN CO1�l 01�1 1TION
4. ALL REQUIRED EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR SPECIAL KNOWLEDGE OR EFFORT. 29. FIRE BLOCKS SHOULD BE PROVIDED IN ACCORDANCE WITH SECTION 717.2, CBC 2013 IN THE FOLLOWING LOCATIONS, P�aN ro NorE: 980 EL CAMINO REAL,#ZOO,SANTA CLARA,CA 9SOSO
A. IN CONCEALED SPACES OF STUD WALLS AND PARTITIONS, INCLUDING FURRED SPACES, AT THE CEILING AND FLOOR LEVELS. TEL,N0. 408 998-4087 � FAX.N0. 408 998-4088
5. THE GENERAL CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS PRIOR TO COMMENCING ANY WORK. THE GENERAL CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY DISCREPANCY B. IN CONCEALED SPACES OF STUD WALLS AND PARTITIONS, INCLUDING FURRED SPACES, AT 10'-0" INTERVALS ALONG THE LENGTH OF THE WALL. � � � �
OF THESE PLANS AND SPECIFICATIONS. C. AT ALL INTERCONNECTIONS BETWEEN CONCEALED VERTICAL AND HORIZONTAL SPACES SUCH AS OCCUR AT SOFFITS, DROP CEILINGS AND COVE CEILINGS.
D. IN CONCEALED SPACES BETWEEN STAIR STRINGERS AT THE TOP AND BOTTOM OF THE RUN BETWEEN STUDS ALONG AND IN LINE WITH THE RUN OF THE STAIRS IF THE WALLS UNDER THE STAIRS CONSULTANT :
6. THE GENERAL CONTRACTOR SHALL MAINTAIN THE JOB SITE IN A CLEAN, ORDERLY CONDITION FREE OF DEBRIS AND LITTER. EACH SUBCONTRACTOR IMMEDIATELY UPON COMPLETION OF EACH PHASE OF ARE UNFINISHED.
HIS WORK SHALL REMOVE ALL TRASH AND DEBRIS AS A RESULT OF HIS OPERATION. THE JOB SITE SHALL BE LEFT CLEAN AND SWEPT EACH DAY BY THE END OF WORK THAT DAY. E. IN OPENINGS AROUND VENTS, PIPES, DUCTS, CHIMNEYS, FIREPLACES AND SIMILAR OPENINGS THAT AFFORD A PASSAGE FOR FIRE AT CEILING AND FLOOR LEVELS, WITH NON COMBUSTIBLE
MATERIALS.
7. NO PORTION OF THE WORK REQUIRING A SHOP DRAWING OR SAMPLE SUBMISSION SHALL BE COMMENCED UNTIL THE SUBMISSION HAS BEEN REVIEWED AND ACTED UPON BY THE ARCHITECT. ALL SUCH
PORTIONS OF WORK SHALL BE IN ACCORDANCE WITH THE REVIEWED SHOP DRAWINGS AND SAMPLES. 30. ALL INTERIOR AND EXTERIOR FINISHES:
AT ALL INSIDE AND OUTSIDE CORNER AND EDGE DETAILS FOR ALL FINISH MATERIALS MUST USE THE APPROPRIATE MANUFACTURER'S RECOMMENDED INSIDE AND OUTSIDE CORNER AND EDGE MATERIALS
8. THE CONTRACTOR SHALL CONFINE OPERATIONS AT THE SITE TO AREAS PERMITTED BY LAW, ORDINANCES, PERMITS AND THE CONTRACT DOCUMENTS, AND SHALL NOT UNREASONABLY ENCUMBER THE SITf AND FINISHES.
WITH ANY MATERIAL OR EQUIPMENT. 31. ALL FIRE RATED INTERIOR STAIRS AND ELEVATOR ENCLOSURES AND LOBBIES, FINISH THE RATED WALLS PRIOR TO THE INSTALLATION OF THE ELEVATOR AND STAIRS.
9. SHOULD AN ERROR APPEAR IN SPECIFICATIONG, DRAWINGS, OR IN WORK DONE BY OTHERS, AFFECTING THIS WORK, NOTIFY THE ARCHITECT AT ONCE. IF CONTRACTOR PROCEEDS WITH WORK AFFECTED 32. ALL WOOD COMING IN CONTACT WITH CONCRETE MUST BE PRESSURE TREATED, TYPICAL.
WITHOUT INSTRUCTIONS FROM THE ARCHITECT, THE CONTRACTOR SHALL TAKE FULL RESPONSIBILITY FOR THE WORK.
10. SHOULD CONFLICT OCCUR IN OR BETWEEN DRAWINGS AND SPECIFICATIONS OR WHERE DETAIL REFERENCES ON CONTRACT DRAWINGS HAVE BEEN OMITTED, CONTRACTOR IS DEEMED TO HAVE ESTIMATED 33. CONTRACTOR & SUB-CONTRACTOR'S RESPONSIBILITY TO MAKE SURE THAT ALL MATERIALS INSTALLATION & CRAFTSMANSHIP FOR THIS PROJECT MEETS ALL APPLICABLE CODES.
THE MOST EXPENSIVE MATERIALS AND CONSTRUCTION INVOLVED UNLESS HE SHALL HAVE ASKED FOR AND OBTAINED WRITTEN DECISION FROM ARCHITECT AS TO WHICH METHOD OR MATERIALS WILL BE
REQUIRED. 34. INCORPORATE BEST MANAGEMENT PRACTICE (CBMP'S) INTO CONSTRUCTION PLANS & INCORPORATE POST CONSTRUCTION WATER RUN-OFF MEASURES INTO PROJECT PLANS IN ACCORDANCE WITH THE CITY'S
URBAN RUN-OFF POLLUTION PREVENTION PROGRAM.
11. ALL PATCHING, REPAIRING AND REPLACING OF MATERIALS AND SURFACES CUT OR DAMAGED IN EXECUTION OF WORK SHALL BE DONE WITH APPLICABLE MATERIALS SO THAT SURFACES REPLACED WILL,
UPON COMPLETION, MATCH SURROUNDING SIMILAR SURFACES. 35. ALL EXTERIOR PLASTER FINISH SHALL BE 7/8" SMOOTH CEMENT PLASTER FINISH UNLESS OTHERWISE NOTED.
12. SEE DOCUMENTS PREPARED BY THE CIVIL ENGINEERING, IF APPLICABLE, FOR ALL FINISH GRADES, DRAINAGE AND SITE DETAILS. REVIEW ALL SITE UTILITY DOCUMENTS, LANDSCAPE AND IRRIGATION 36. PLASTER EXPANSION JOINTS SHOULD MEET THE FOLLOWING CRITERIA OR AS SHOWN ON THE DRAWINGS.
DOCUMENTS PRIOR OR COMMENCEMENT OF ANY UNDER GROUNDING OR TRENCHING. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES OF THE CONTRACT DOCUMENTS. A. NO LENGTH SHOULD BE GREATER THAN 18 FT. IN EITHER DIRECTION. B. NO PANEL SHOULD EXCEED 144 SQ. FT. FOR VERTICAL APPLICATIONS
B. NO PANEL SHOULD EXCEED 100 SQ. FT. FOR HORIZONTAL, CURVED, OR ANGULAR SECTIONS D. NO LENGTH-TO-WIDTH RATIO SHOULD EXCEED 2 1/2 TO 1 IN ANY GIVEN PANEL.
13. CONSTRUCTION CONTRACTOR AND HIS SUBCONTRACTORS AGREE THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR AND HIS SUBCONTRACTORS
WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND 37. FLASHING PROVIDER TO PRIME AND PAINT WITH RUST PROOF PAINT ALL FLASHINGS.
PROPERTY, THAT THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT LIMITED TO NORMAL WORKING HOURS, AND CONSTRUCTION CONTRACTOR AND HIS SUBCONTRACTORS FURTHER
AGREE TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, 38. SUBMITfAL REVIEW: PRO�IECT :
EXCEPT LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL AS IDENTIFIED IN ITEM #14 OF THESE GENERAL CONDITIONS. REVIEW IS FOR THE LIMITED PURPOSE OF CHECKING FOR CONFORMANCE WITH INFORMATION GIVEN AND THE DESIGN CONCEPT EXPRESSED IN THE CONTRACT DOCUMENTS. REVIEW OF SUCH SUBMITTALS IS NOT
CONDUCTED FOR THE PURPOSE OF DETERMINING THE ACCURACY AND COMPLETENESS OF OTHER DETAILS SUCH AS DIMENSIONS AND QUANTITIES, OR FOR SUBSTANTIATING INSTRUCTIONS FOR INSTALLATION OR
14. GENERAL CONTRACTORS, SUBCONTRACTORS, BUILDERS, AND OWNER ARE TO CHECK ALL DRAWINGS FOR ERRORS AND OMISSIONS PRIOR TO COMMENCEMENT OF CONSTRUCTION. ANY ERRORS AND/OR PERFORMANCE OF EQUIPMENT OR SYSTEMS, ALL OF WHICH REMAIN THE RESPONSIBILITY OF THE CONTRACTOR AS REQUIRED BY THE CONTRACT DOCUMENTS. NON CONFORMITIES AND ERRORS ARE NOTED.
OMISSIONS MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT IN WRITING PRIOR TO COMMENCEMENT OF CONSTRUCTION. THE ARCHITECT WILL NOT TAKE LIABILITY FOR ANY ERRORS AND/OR CONTRACTOR IS SOLELY RESPONSIBLE FOR: CORRECTNESS OF DIMENSIONS AND QUANTITIES AND FITTING TO OTHER WORK VERIFICATION OF PHYSICAL INTERRELATION OF ELEMENTS OF THE WORK FROM PLANS AND
OMISSIONS NOT REPORTED IMMEDIATELY IN WRITING PRIOR TO COMMENCEMENT OF CONSTRUCTION. THE ARCHITECT'S LIABILITY FOR THE TOTAL PROJECT SHALL NOT EXCEED ONE THOUSAND DOLLARS. SPECIFICATIONS AND IN THE FIELD. THE ARCHITECT'S REVIEW SHALL NOT CONSTITUTE APPROVAL OF SAFETY PRECAUTIONS, OR UNLESS OTHERWISE SPECIFICALLY STATED BY THE ARCHITECT, OF ANY CONSTRUCTION
MEANS, METHODS, TECHNIQUES, SEQUENCES, OR PROCEDURES. THE ARCHITECT'S REVIEW OF A SPECIFIC ITEM SHALL NOT INDICATE APPROVAL OF AN ASSEMBLY OF WHICH THE ITEM IS A COMPONENT. THIS Our Lad O1
15. ALL SCREWS/NAILS IN FINISH WOODWORK TO BE COUNTERSUNK AND FILLED SMOOTH WITH PUTTY TO MATCH FINISH. REVIEW DOES NOT RELIEVE THE CONTRACTOR FROM THESE RESPONSIBILITIES. THIS REVIEW DOES NOT CONSTITUTE APPROVAL OR ACCEPTANCE OF DEVIATIONS AND OR VARIATIONS. DEVIATIONS AND OR VARIATIONS �
MUST BE CLEARLY IDENTIFIED AND REQUESTED BY WRITTEN CORRESPONDENCE BY THE CONTRACTOR TO SALVATORE CARUSO DESIGN CORPORATION AND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
16. IF THE MANUFACTURER'S SPECIFICATIONS AND APPLICABLE CODES ARE NOT CONSISTENT WITH EACH OTHER, NOTIFY THE ARCHITECT IMMEDIATELY PRIOR TO COMMENCEMENT OF ANY WORK AND AWAIT 39. BIDDING: Santa Clara
DIRECTION OR CONTRACTOR ACCEPTS FULL RESPONSIBILITY OF WORK COMPLETED. A. THE CONTRACTOR NEEDS TO EXAMINE ALL THE DRAWINGS AND THE SITE CONDITIONS IF THEY ARE DIFFERENT FROM THE DRAWINGSVERIFY ALL THE EXISTING CONDITIONS ON SITE AND NOTIFY THE ARCHITECT
17. ALL GYPSUM BOARD TO BE A MINIMUM OF 5/8" TYPE "X" SHEETROCK, MINIMUM LEVEL 5 SMOOTH FINISH OR AS OTHERWISE INDICATED ON DRAWINGS. INSTALL AS NEEDED TO MEET APPLICABLE PRIOR TO ANY CONSTRUCTION.
CODES. USE RADIUSED CORNERS. B. PLEASE BID FOR MAX. OF 10 COLORS IN A BID, NOT EXCEEDING 4 COLORS IN ANY GIVEN ROOM AT A TIME. ZZSZS SAN NAN ROAD
40. REQUEST FOR INFORMATION: CUPERTINO,CA 95014
18. SHOP DRAWINGS AND SAMPLES FOR ALL FlNISH MATERWLS INCLUDING BUT NOT LIMITED TO THOSE USTED BQOW. DEFERRED SUBMfITALS� SEE NOTE �27 BELOW. REVIEW OF REQUEST FOR INFORMATION WILL TAKE A MINIMUM OF THREE WORKING DAYS.
ITEMS #1: SUBMITTALS REQUEST FOR THE FOLLOWING:
1. ARCHITECTURAL SHEET METAL 1. 100� OF ALL FINISH MATERIALS INCLUDING EXTERIOR, INTERIOR & ROOF MATERIALS, 41. CHANGE ORDER:
2. WINDOWS, INTERIOR AND EXTERIOR DOORS 19. MANUALS / CUT SHEETS (4 COPIES). PAINTS, PLASTER FINISH, AND OR ANY FINISH EXTERIOR MATERIAL. A. CHANGE ORDERS MUST BE SUBMITTED BY THE CONTRATOR MAXIMUM OF ONE CALENDAR WEEK FROM THE TIME CONTRACTOR IS AWARE OF THE ISSUE AND/OR HAS A CHANGE ORDER REQUEST BY THE
3. LADDERS ITEMS #2: 2. SUBMITTALS & SHOP DRAWINGS MUST BE REVIEWED BY ARCHITECT AND OWNER PRIOR OWNER.
4. MECHANICAL SYSTEMS 1. DOOR HARDWARE TO CONTRACTOR ORDERING ANY RELATED MATERIAL. B. NO MATERIAL(S) SHALL BE PURCHASED OR WORK DONE UNLESS WITH AN APPROVED, SIGNED, CHANGE ORDER HAS BEEN PROCESSED.
5. HVAC DUCTWORK 2. ACCESS DOORS 3. IF CONTRACTOR ORDERS MATERIAL PRIOR TO ARCHITECT'S OR OWNER'S REVIEW THE
6. HANDRAIL/GUARDRAIL 3. ROOF HATCH CONTRACTOR ASSUMES 100% OF ALL RELATED RESPONSIBILITY AND LIABILITY OF THE 42. INTERIOR AND EXTERIOR PAINT TO BE MINIMUM OF ONE (1) COAT OF PRIMER AND MINIMUM OF TWO (2) COATS OF PAINT. GENERAL NOTES :
7. STRUCTURAL STEEL 4. LIGHT FIXTURES MATERIALS ORDERED.
8. REBAR 5. ELECTRICAL PANELS 1. THIS SHEEf IS PART OF A SEf & IS NOT TO BE USED ALONE.
4. THE ARCHITECT AND OWNER WILL HAVE NO LIABILITY OR RESPONSIBILITY, ERRORS OR 43. EXTERIOR WALL PAINT TO BE EGGSHELL, EXTERIOR TRIM TO BE GLOSSY, UNLESS NOTED OTHERWISE. CONTACTOR TO PROVIDE FULL COVERAGE WITH PAINT.
9. LOCKERS 6. PLUMBING FIXTURES OMISSIONS RESPONSIBILITIES OR LIABILITIES FOR THE ACCURACY OF THE DRAWINGS 2. THIS SHEEf IS NOT FOR CONSTRUCTION UNTIL THE ARCHITECT'S STAMP
10. STAIR SHOP DWGS. 7. FIRE EXTINGUISHER 44. SUBSTITUTIONS: & SIGNATURE ARE ON THIS SHEEf
USED BY THE CONTRACTOR TO GENERATE THE ORDER OF SAID MATERIALS .
1 1. ELEVATOR SHOP DWGS. 8. SKYLIGHTS 3. THESE PLANS & PRINTS ARE OWNED BY THE ARCHITECT & ARE fOR USE
12. PAINT BRUSH OUTS 9. APPLIANCES, EQUIPMENTS A. ONE OR MORE MAKES OF MATERIALS OR METHODS MAY HAVE BEEN SPECIFIED TO ESTABLISH THE STANDARD OF QUALITY, WORKMANSHIP, FINISH, AND DESIGN REQUIRED, BUT OTHER MATERIALS ON THIS PROJECT ONLY. REPRODUCTION AND/OR DISTRIBUTION WITHOUT
OR METHODS EQUAL OR BETTER IN QUALITY, WORKMANSHIP, FINISH, DESIGN, AND GUARANTEED PERFORMANCE, MAY BE SUBMITTED FOR REVIEW AND APPROVAL AS SUBSTITUTION. ALL THE WRIITEN CONSENT Of THE ARCHITECT IS FORBIDDEN.
20. A DELTA ("o") SYMBOL LOCATED AT THE TOP RIGHT HAND CORNER OF ANY DRAWING INDICATES THAT DRAWING HAS BEEN SIGNIFICANTLY REVISED AND SHOULD BE TREATED AS AN ENTIRELY NEW SUBSTITUTIONS ARE SUBJECT TO REVIEW AND APPROVAL BY ARCHITECT, ENGINEER AND OWNER. 4. COPYRIGHT c BY SALVATORE CARUSO DESIGN CORP.
DRAWING.
B. SUBSTITUTIONS SHALL BE REQUESTED IN A WRITTEN FORM AND SHALL BE ACCOMPANIED WITH A SIGNED STATEMENT THAT PROPOSED SUBSTITUTION IS EQUAL, OR BETTER THAN SPECIFIED.
21. CONTRACTOR TO PROTECT ALL INTERIOR SPACES (AS REQUIRED) FROM ANY WEATHER, THEFT, OR VANDALISM. ADDITIONAL DOCUMENTATION TO SUBSTANTIATED PROPOSED SUBSTITUTION MAY BE REQUIRED BY OWNER, ARCHITECT AND ENGINEER. CONTRACTOR SHALL SUBMIT AS DIRECTED.
22. CONCTRACTOR TO BE RESPONSIBLE FOR ALL WALLS, FLOORS AND CEILINGS TO BE 'LEVEL' AND PLUMB' AND FINISH TO MATCH EXISTING ADJACENT SURFACES. ALL NEW FINISHES AND FIXTURES ARE TC C. CONTRACTOR SHALL ACCOMPANY REQUEST FOR SUBSTITUTION LETTER WITH A COMPLETED CSI SUBSTITUTION FORM INCLUDE THE COMPARISON FOR FOLLOWING:
BE APPROVED BY ARCHITECT, PRIOR TO INSTALLATION. NEW MATERIALS MATCHING EXISTING MATERIALS TO BE 'LIKE' MATERIAL, NOT JUST MATCHING IN STYLE. 1. ELECTRICAL RATING
2. FINISHES
23. RELOCATE OR INSTALL NEW PLUMBING, GAS, AND ELECTRICAL LINES (AS REQUIRED) FOR THE NEW CONSTRUCTION. SEE MECHANICAL DRAWINGS. 3. SPARE PARTS G E N E RAL N OTE
4. PERFORMANCE DATA
24. CONTRACTOR TO DISPOSE OF ALL DEBRIS AT AN APPROVED DUMP SITE PER ALL TOWN, COUNTY, STATE AND FEDERAL REGULATIONS. 5. COSTS AND SCHEDULE
D. A WRITTEN SIGNED STATEMENT FROM THE GENERAL CONTRACTOR SHALL ACCOMPANY SUBSTITUTION REQUEST FORM ASSURING THAT:
25. CONTRACTOR TO NOTIFY OWNER AND ARCHITECT IF HE SUSPECTS THAT ANY ASBESTOS IS ON SITE, STOP WORK IMMEDIATELY UNTIL AUTHORITIES HAVE PROVED THE WORK TO BE SAFE. 1. CONTRACTOR HAS VERIFIED DIMENSIONS WITH PROJECT CONDITIONS AND HAS COORDINATED WITH OTHER TRADES. SUBSTITUTION DOES NOT AFFECT DIMENSIONS SHOWN ON DRAWINGS.
26. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION OR ORDERING ANY MATERIALS FOR THE PROJECT. 2. CONTRACTOR SHALL PAY AND BURDEN THE COSTS FOR CHANGES TO THE PROJECT INCLUDING RE-DESIGN, RE-ENGINEERING AND REVIEW OF SUBSTITUTION. ONLY ONE (1) ENGINEERING
REVIEW TIME IS ALLOWED FOR EACH PRODUCT SUBSTITUTION. CONTRACTOR SHALL BE RESPONSIBLE FOR ADDITIONAL REVIEW TIME AND SHALL PAY ARCHITECT AND ENGINEER'S TIME AT SHEET NAME :
27. ANY DEFERRED SUBMITfAL SHALL BE FIRST SUBMITfED TO THE PROJECT ARCHITECT AND/ OR ENGINEER FOR REVIEW OR COORDINATION; FOLLOWING THE COMPLETION OF PROJECT ARCHITECT/ENGINEER THEIR PROFESSIONAL RATE SCHEDULE.
REVIEW AND COORDINATION, A SUBMITTAL TO THE CITY SHALL BE MADE (FOR CITY REVIEW AND APPROVAL), WHICH SHALL INDICATE A LEfTER STATING THIS REVIEW AND COORDINATION HAS BEEN 3. CONTRACTOR HAS CONFIRMED THAT THE PROPOSED SUBSTITUTION WILL HAVE NO ADVERSE AFFECT ON OTHER TRADES, THE CONSTRUCTION SCHEDULE, OR SPECIFIED WARRANTY
PERFORMED AND COMPLETED AND PLANS AND CALCULATIONS FOR THE DEFERRED ITEMS ARE FOUND TO BE ACCEPTABLE (E.G. WITH REGARD TO GEOMEI'RY, LOAD CONDITION, ETC.) WITH NO REQUIREMENTS.
EXCEPTIONS. 4. CONTRACTOR HAS CONFIRMED THAT MAINTENANCE AND SERVICE PARTS WILL BE LOCALLY AVAILABLE FOR THE PROPOSED SUBSTITUTION.
E. COST SAVINGS RESULTING FROM SUBSTITUTION SHALL BE RETURNED TO THE CONTRACT OR THE OWNER IF THE SUBSTITUTION IS PERMITTED.
F. NO WORK INVOLVING MATERIALS SUBMITTED FOR SUBSTITUTION SHALL PROCEED UNTIL WRITTEN ACCEPTANCE IS RECEIVED FROM THE OWNER. THE OWNER IS THE FINAL JUDGE OF ACCEPTABILITY
OF PREFERRED SUBSTITUTIONS.
REVISIONS BY
EXITING NOTES:
� PLANNING COMMENTS
E1. EXIT DOORS SHALL BE OPENABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT.
E2. EXIT DOORS SHALL SWING IN THE DIRECTION OF EXIT TRAVEL WHEN SERVING ANY HAZARDOUS AREA OR WHEN THE AREA SERVED HAS AN OCCUPANT LOAD OF 50 OR MORE.
E3. NUMBER OF EXITS. EVERY BUILDING OR USABLE PORTION THEREOF SHALL HAVE AT LEAST ONE EXIT AND SHALL HAVE NOT LESS THAN TWO EXITS WHERE REQUIRED BY SECTION 1014 AND 1019, AND ADDITIONAL EXITS AS REQUIRED BY THIS SECTION.
E4. EXITS SHALL BE ILLUMINATED AT ANY TIME THE BUILDING IS OCCUPIED WITH LIGHT HAVING INTENSITY OF NOT LESS THAT 1 FOOT-CANDLE AT FLOOR LEVEL.
E5. SEPARATE SOURCES OF POWER. THE POWER SUPPLY FOR EXIT ILLUMINATION SHALL NORMALLY BE PROVIDED BY THE PREMISES' WIRING SYSTEM. IN THE EVENT OF ITS FAILURE, ILLUMINATION SHALL BE AUTOMATICALLY PROVIDED FROM AN EMERGENCY SYSTEM
FOR GROUP 1, DIVISIONS 1.1 AND 1.2. OCCUPANCIES AND FOR ALL OTHER OCCUPANCIES WHERE THE EXISTING SYSTEM SERVES MORE THAN 100 PERSONS.
E6. WHEN TWO OR MORE EXITS ARE REQUIRED FROM A ROOM OR AREA, EXIT SIGNS SHALL BE INSTALLED AT THE REQUIRED EXITS. DIRECTIONAL SIGNAGE SHALL BE INSTALLED WHERE NEEDED TO INDICATE THE DIRECTION OF EGRESS. GRAPHICS, ILLUMINATION AND
POWER SUPPLY SHALL COMPLY WITH CBC 101 1, 101 1.5.3 AND 1006.3
E7. AISLES LEADING TO REQUIRED EXITS SHALL BE PROVIDED FROM ALL PORTIONS OF BUILDINGS. IN PUBLIC AREAS OF GROUP B AND M OCCUPANCIES, AND IN ASSEMBLY OCCUPANCIES WITHOUT FIXED SEATS THE MINIMUM CLEAR AISLE WIDTH SHALL BE 36 INCHES
WHERE TABLES, COUNTERS, FURNISHINGS, MERCHANDISE OR OTHER SIMILAR OBSTRUCTIONS ARE PLACE ON ONE SIDE OF THE AISLE ONLY AND 44 INCHES WHEN SUCH OBSTRUCTIONS ARE PLACED ON BOTH SIDES OF THE AISLE.
E8. ANY GLAZING WITHIN 24 INCHES OF EITHER SIDE OF ANY DOOR GREATER THAN 9 S.F. OF AREA WITH BOTTOM EDGE LESS THAN 18 INCHES ABOVE (AND HORIZONTALLY, WITHIN 36 INCHES) OF WALKING SURFACE SHALL BE SAFETY GLAZED (i.e. TEMPERED). DRAWN:
CHECKED:
DATE: 6/11/13
SCALE:
JOB No.: 13.01.01
SHEET No.:
A0 . 2
SHEETS IN SET