B-2016-1752CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: CONTRACTOR: PERMIT NO: B-2016-1752
10225 CARMEN RD CUPERTINO, CA 95014-2758 (357 02 002) HIGHLIGHT SOLAR
INC A CALIFORNIA
CORPORATION
SAN JOSE, CA 95117
1OWNER'SNAME: MCMILLIONMICHAELTRUSTEE&ET AL I IDATE ISSUED:04/13/2016
I OWNER'S PHONE: 408-504-3478 1 I PHONE NO: (408) 489-9273 I
LICENSED CONTRACTOR'S DECLARATION
License Class C-46 Lic. #960376
Contractor HIGHLIGHT SOLAR INC A CALIFORNIA CORPORATION Date
0413012017
I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing
with Section 7000) of Division 3 of the Business & Professions Code and that my
license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
1. I have and will maintain a certificate of consent to self -insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
erforinance of the work for which this permit is issued.
2. have and will maintain Worker's Compensation Insurance, as provided for by
Section 3700 of the Labor Code, for the performance of the work for which this
permit is issued.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above
information is correct. I agree to comply with all city and county ordinances
and state laws relating to building construction, and hereby authorize
representatives of this city to enter upon the above mentioned property for
inspection purposes. (We) agree to save indemnify and keep harmless the
City of Cupertino against liabilities, judgments, costs, and expenses which
may accrue against said City in consequence of the granting of this permit.
Additionally, the applicant understands and will comply with all non -point
source regulations per the Cupertino Municipal Code, Section 9.18.
.Std t�u"re � � Date 4/13/2016
I hereby affirm that I am exempt from the Contractor's License Law for one of the
following two reasons:
1. I, as owner of the property, or my employees with wages as their sole
compensation, will do the work, and the structure is not,intended or offered for
sale (Sec.7044, Business & Professions Code)
2. I, as owner of the property, am exclusively contracting with licensed
contractors to construct the project (Sec.7044, Business & Professions Code).
I hereby affirm under penalty of perjury one of the following three declarations:
1. I have and will maintain a Certificate of Consent to self -insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
2. I have and will maintain Worker's Compensation Insurance, as provided for by
Section 3700 of the Labor Code, for the performance of the work for which this
permit is issued.
3. I certify that in the performance of the work for which this permit is issued, I
shall not employ any person in any manner so as to become subject to the
Worker's Compensation laws of California. If, after making this certificate of
exemption, I become subject to the Worker's Compensation provisions of the
Labor Code, I must forthwith comply with such provisions or this permit shall
be deemed revoked.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is
correct. I agree to comply with all city and county ordinances and state laws
relating to building construction, and hereby authorize representatives of this city
to enter upon the above mentioned property for inspection purposes. (We) agree
to save indemnify and keep harmless the City of Cupertino against liabilities,
judgments, costs, and expenses which may accrue against said City in
consequence of the granting of this permit. Additionally, the applicant understands
and will comply with all non -point source regulations.per the Cupertino Municipal
Code, Section 9.18.
Signature Date 4/13/2016
BUILDING PERMIT INFO:
X BLDG —ELECT —PLUMB
_ MECH X RESIDENTIAL _ COMMERCIAL
JOB DESCRIPTION:
INSTALL 24 (N)SOLAR PANELS 7.56 KW
Sq. Ft Floor Area: l Valuation: $29500.00
APN Number: Occupancy Type:
357 02 002
PERMIT EXPIRES IF WORK IS NOT STARTED
WITHIN 180 DAYS OF PERMIT ISSUANCE OR
180 DAYS FROM LAST CALLED INSPECTION.
Issued by: Abby Avende �nn
Date: 04/13/2016 OBW G A IVA4W
RE -ROOFS:
All roofs shall be inspected prior to any roofing inaterial being installed. If a roof is
installed without first obtaining an inspection, I agree to remove all new materials for
inspection.
Signature ofApplicant:
-
Date: 4/13/2016
ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER
HAZARDOUS MATERIALS DISCLOSURE
I have read the hazardous materials requirements under Chapter 6.95 of the
California Health & Safety Code, Sections 25505, 25533, and 25534. I will
maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the
Health & Safety Code, Section 25532(a) should I store or handle hazardous
material. Additionally, should I use equipment or devices which emit hazardous
air contaminants as defined by the Bay Area Air Quality Management District I
will maintain compliance with tite Cupertino Municipal Code, Chapter 9.12 and
the Health & Safety Code, Secti is 25505, 25533, and 25534.
f {.
,�O - or authorized agent:
I3.dte: 4/13/2016
CONSTRU TION LENDING AGENCY
I hereby affirm that there is a construction lending agency for the performance
of work's for which this permit is issued (Sec. 3097, Civ C.)
Lender's Name
Lender's Address
ARCHITECT'S DECLARATION
I understand my plans shall be used as public records.
Licensed
Professional
ALTERNATIVE ENERGY PERMIT APPLICATION
COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3228 • FAX (408) 777-3333 • building (a,cugertino.orq
PROJECT ADDRESS I Z 2 y^ (f % �� I APN R ()I_ 002
OWNER NAME MiG G MC LL,
IPHONE4 D9 6'0 L3LI
E-MAIL `L, f.7LtDm�.
/ `
STREET ADDRESS 10225
CITY,"r-'STATE, ZIP
FAX
�yhen
�u Sao) �
CONTACT NAME `
.�'
PHONE
t�L L
�-C
STREET ADDRESS �
` Par1�61b
CITY, STATE, ZIVP
�� G �
-t
FAX
6 J v
�
.
❑ OWN'P-R ❑ OWNER -BUILDER ❑ OWNER AGENT CONTRACTOR ❑ CONTRACTOR AGENT ❑ ARCHrIECT ❑ ENGINEER ❑ DEVELOPER ❑ TENANT
CONTRACTORNAME
MC�
LICENSENUMBER ��(1` jp
LICENSE TYPE
BUS. LICA
at
COMPANY NAME E-MAIL
'
FAX
' , L
STREET ADDRESS CITY, STATE, IP
355 4 P�r�l I Ij
PHONE
W.
+� /Fv� 0,i,CAelS
lot
ARCHITECT/ENGINEER NAME
LICENSE NUMBER
I BUS. LIC R
COMPANY NAME
E-MAIL
FAX
STREET ADDRESS
CITY, STATE, ZIP
PHONE
USE OF SFD or Duplex ❑ Multi -Family
PROJECT IN WILDLAND
PROJECT IN
STRUCTURE: ❑ Commercial
URBAN INTERFACE AREA ❑ Yes ❑ NO
FLOOD ZONE ❑ Yes ❑ NO
SOLAR PANELS
❑ ELECTRIC VEHICLE CHARGING STATION
❑ SOLAR WATER HEATING
❑ OTHER:
FOR SOLAR PANELS: NUMBER OF PANELS/UNITS: KILOWATTS (COMMERCIAL ONLY) r
TOTAL VALUATION:
DESCRIPTION OF WORK
yRECEI\ ED BY t i
ti k
.
By my signature below, I certify to each of the following: I am the property owner or authorized agent to act on the property owner's behalf. I'h e read this
application and the information I have provided is correct. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local
ordinances and state laws relating to buildip/ construction. I authorize representatives of Cupertino to enter the above -identified property for inspection purposes.
S ignature. of Applicant/Agent: Date:
SUPPLEMENTAL IINIFORMATION REQUIRED
FTCEU�E
r-
U�
-❑� OVERTHUCOUT�TER rr_.
o u{
r-
,.
'�
.❑� ST.'Ai�'DARD �. � ' `k �ry -
}V
t
M
,on
W
Pi,.4pp_2011.doc revised 03116111
GENERAL NOTES
1. ALL ELECTRICAL MATERIALS SHALL BE NEW AND LISTED BY
RECOGNIZED ELECTRICAL TESTING LABORATORY
CUSTOM MADE EQUIPMENT SHALL HAVE COMPLETE TEST DATA
SUBMITTED BY THE MANUFACTURER ATTESTING TO ITS SAFETY
2. OUTDOOR EQUIPMENT SHALL BE AT LEAST NEMA 3R RATED
3. ALL METALLIC EQUIPMENT SHALL BE GROUNDED
4. ALL SPECIFIC WIRING IS BASED ON THE USE OF COPPER.
5. CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS PRIOR TO
INSTALLATION AND SHALL COORDINATE ALL INSPECTIONS, TESTING
COMMISSIONING AND ACCEPTANCE WITH THE CLIENT,
UTILITY CO. AND CITY INSPECTORS AS NEEDED.
6. THE ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT
LOCATIONS OF SERVICE POINTS AND SERVICE SIZES WITH THE
SERVING UTILITY COMPANY AND COMPLY WITH ALL UTILITY
COMPANIES REQUIREMENTS. IF THE SOLAR BACK FED BREAKER IS
VOER THE BUSS SIZE 20% LIMIT, CONTRACTOR SHALL INCLUDE THE
COST TO REPLACE MAIN BREAKER OR ENLARGE MAIN CAPACITY.
7. DRAWINGS ARE DIAGRAMMATIC ONLY, ROUTING OF RACEWAYS
SHALL BE OPTION OF THE CONTRACTOR UNLESS OTHERWISE
NOTED AND SHALL BE COORDINATED WITH OTHER TRADES.
8. IF THE ROOF MATERIAL OR ROOF STRUCTURE NOT ADEQUATE
FOR PV INSTALLATION, CALL ENGINEER PRIOR TO INSTALL. THE
CONTRACTOR IS RESPONSIBLE TO VERIFY THAT THE ROOF IS
CAPABLE OF WHITSANDING THE EXTRA WEIGHT.
9. IF THE DISTANCES FOR CABLE RUNS ARE DIFFERE N �Fnj ARTMEI�
SHOWN, THE CONTRACTOR SHALL I�'Of��Fl�;i flLTRICCA,_
INO
ENGINEER TO VALIDATE THE SIRE SIZE. FINAL DRAWINGS
WILL BE RED -LINED AND UPDATED AS ;APPRPRIAT.E.
10. WHENEVER A DISCREPANCY INIQUALITY OF EQUIPMENT ARISES ON THE
DRAWING OR SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE
FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICES REC2UIREE
BY THE STRICTEST CONDITIONS NOTED ON THE DRAWING'S'OR IN"THE
SPECIFICATIONS TO ENSURE COMPLETE COMPLIANCE AND, LON.GEVITYOF
THE OPERABLE SYSTEM REQUIRED BY THE ARCHITECT/EN,GI,NEE.R.S
11. ALL BROCHURES, OPERATION MANUALS;,CATAL'O'GS,`S'HO'F"'
DRAWINGS, ETC. SHALL BE HANDED OVER TO OWNER'S �, c
REPRESENTATIVE AT THE bb-WPtLETI=O='�_-FS_':' R _ _*
D,, � -
PHOTOVOLTAIC NOTES: PERMIT NO.
1. ROOFTOP MOUNTED PHOTOVOLTAIC PANELS AND MODULES
SHALL BE TESTED, LISTED AND IDENTIFIED UL 1703.
2. SOLAR SYSTEM SHALL NOT COVER ANY PLUMBING OR MECHANICAL
VENTS
3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED.
4. SOLAR INVERTER MUST HAVE A MANUFACTURE
INSTALLED DISCONNECTING MEANS THAT PREVENTS
PARALLEL FEEDING UTILITY LINES DURING POWER OUTAGE.
5. REMOVAL OF AN INTERACTIVE INVERTER OR OTHER EQUIPMENT
SHALL NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE
GROUNDING ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC
SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTORS.
6. ALL PV MODULES AND ASSOCIATED EQUIPMENT AND
WIRING SHALL BE PROTECTED FROM ANY PHYSICAL
DAMAGE.
7. LIVE PARTS OF PV SOURCE CIRCUITS AND PV OUTP
CIRCUITS OVER 150V TO GROUND SHALL NOT Be
ACCESSIBLE TO OTHER THAN QUALIFIED PERSZASI ' L
ENERGIZED.
8. INVERTER IS EQUIPED W/ INTEGRATED GFDI, THUS
PROVIDING GROUND FAULT PROTECTION
9. ALL CONDUCTORS SHALL BE COPPER AND 90 DEG RATED
10. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY A
RECOGNIZED ELECTRICAL TESTING LABORATORY OR
APPROVED BY THE DEPARTMENT.
11. CONDUITS SHOULD BE PAINTED TO MATCH EXISTING
ROOF AND WALL COLORS
12. ALL WORK SHALL BE IN ACCORD WITH THE 2013 CBC, 2013
CEC AND 2011 NEC WITH SPECIAL ENPHASIS ON ARTICLE 690
13. THE OUTPUT OF A UTILITY INTERACTIVE -INVERTER SHALL
BE PERMITTED TO BE CONNECTED TO THE SUPPLY SIDE OF
THE SERVICE DISCONNECTING
MEANS AS PER 230.82(6)
14. A SINGLE CONDUCTOR SHALL BE PERMITTED TO BE USED
TO PERFORM THE MULTIPLE FUNCTIONS OF DC GROUNDING,
AC GROUNDING
AND BONDING BETWEEN AC AND DC SYSTEMS AS PER NEC
690.47(C) AND SIZED AS PER SEC 250.122
15. EQUIPMENT GROUND CONDUCTOR REQUIRED IN
RACEWAYS SIZED PER CEC 250-122.
16. PER ART 250.92. NON -CURRENT CARRYING METAL PARTS
I.OF EQUIPMENT SHALL BE EFFECTIVELY BONDED TOGETHER.
:.,;.-BOND BOTH ENDS OF RACEWAYS
SHEET INDEX
1 1 1 ROOF PLAN
I*:?r- :I T-STNUGLE LINE DIAGRAM
Aw 3v"°" s CODE REQUIRED SIGNAGE
4 SITE PLAN,
5 ATTACHMENT LAYOUT
6 INVERTER DATA SHEET
7
MODULE DATA SHEET
S
MODULE CERTIFICATION
9
RACKING DATA SHEET
10
RACKING SPECS
11
ATTACHMENT DATA SHEET
INSTALLER
Highlight Solar Inc.
Address:
1624 Remuda Lane,
San Jose, CA 95112
Phone Number:
(866) 926-9997
Lic# 960376
Class C-46
DESIGNER NAME:
DAVID D.
DATE.
12 APRIL 2016
THE INSTALLATION OF SOLAR ARRAYS AND PHOTOVOLTAIC POWER
SYSTEMS SHALL BE IN ACCORDANCE WITH THE MOST RECENT CPC, CMC,
2013 CEC, 2013 CRC, 2013 CBC AND 2011 NEC. AS AMMENDED BY THE LOCAL
AHJ. STRUCTUAL CONNECTIONS SHALL BE TO 2013 IBC.
PHOTOVOLTAIC SYSTEM SUMMARY
SYSTEM SIZE: DC STC: 7.56 KW
SYSTEM SIZE: AC CEC 6.66 KW
SOLAR MODULES: (24) LG SOLAR LG315N1C-G4
MICROINVERTERS:(24) M250-60-2LL-S2X
MOUNTING SYSTEM: DUAL RACK
ELECTRICAL INFORMATION:
MAIN SERVICE PANEL BUS SIZE:
MAIN SERVICE BREAKER SIZE: 20
BUILDING INFORMATION:
ONE STORY HOUSE
CONSTRUCTION TYPE: V-B
OCCUPANCY: R
ROOF: ASPHALT SHINGLE
TRUSSE$ Q 2 CI _6
ewilding Depa b-nel kl
PROJECT NAME: Michael McMillion
PLOT LANE ECKED COY
�I 1A1 _ 10225 Carmen Rd, Cupertino, CA 95014 ��„�,�,nr�� ��l �;®� �� �t �_� ���E
VICINITY MAP
SCALEATS
SATELLITE VIEW
SCALE:NTS
STREET VIEW
SCALE:NTS
PHOTOVOLTAIC ARRAY
(24) LG Electronics 315 W Solar Modules (LG315N1 C-G4)
(24) Enphase Energy (M250-60-2LL-S2X)
MATERIAL LIST TABLE
Module: x 24 LG315N1 C-G4
Microinverter : x 24 M250-60-2LL-S2X
Rail : x 19 168" Dual Rack Rails
Attachment: x 80 Dual Rack Flashed L-Kit
Ground Lug : x 48 Dual Rack Ground Lugs
End Clamp : x 24 Dual Rack End Clamps
Mid Clamp: x 36 Dual Rack Mid Clamps
Channel Strut: 24
Enphase Trunk Cable: x 24
Monitoring Gateway: x 1
2
1.GROUNDING MID CLUMP (M8 REC. TORQUE 10FT-LBS)
2.END CLAMP (M8 REC. TORQUE 10 FT-LBS)
3.DUAL RACK RAIL ISTkNDARD,LITE OR HEAVY RAIL)
*GROUNDING LUG
3/8 " BOLT TO MODULES OR RAILS (REC.TORQUE 10 FT-LBS)
3/8 " BOLT TO EGC (REC.TORQUE 5 FT-LBS)
4.ONE LUG AT THE 1ST MODULE
ONE LUG AT THE LAST MODULE
5.ONE LUG BETWEEN TWO SPLICES OF RAILS
6.ONE LUG AT THE END OF THE RAIL TO GO TO THE J-BOX
7. #6 BARE COPPER EGC
8.PV MODULES
GROUNDING AND CLAMPING DETAIL
UL 2703 AND UL467 CERTIFIED
FROM JUNCTION BOX TO ROOF EAVE EMT TYPE
CONDUIT WILL RUN OVER THE ROOF AT 3 1/2" HEIGHT,
THEN UNDER THE EAVE TO MAIN SERVICE PANEL
UNIT INDEX
MSP
(E) 200A Main Service Panel
J/B
(N) Junction Box
M250 Micro Inverter
Solar Module
EMT Type Conduit
(C"PCE
1361161ng
09 r"
N
0°
W E
270° 90°
S
180°
SCALE
01 5 10ft
General Notes
ROOF PLAN
Drawn By: David D.
No.
Revision/Issue
Date
CONTRACTOR
nme...•, _
Highlight Solar Inc.
Address:
1624 Remuda Lane,
San Jose,
CA 95112
Phone Number:
(866) 926-9997
Lic# 960376
ant
�``Hig.hllig
t Solar
o
a.J.* em • ,*—
Michael McMil/ion
10225 Carmen Rd,
Cupertino, CA 95014
oat.
April 12, 2016
sod.
AS INDICATED
PV SYSTEM
NOTE:
A continuity of equipment grounding shall be provided with a minimum of #6 AWG copper
grounding conductor between rail interconnection, and rail end connection with UL Listed
Lay -In lugs (See Spec sheet on page #10)
PV ARRAY1
%
B CIRCUIT a
i Boxi
9 LG ELECTRONICS
—❑+ —❑+
—❑+ —❑+
NEMY6"
Y 6"BY6"
AC.2
315 WATT MODULES,
I I
9 ENPHASE
/�
\'��/=\y�
/�
i (
3/4" EMT
CONDUIT/
MICROINVERTERS
S
50 FEET
PV ARRAY2
— —
I J Box2
B CIRCUIT b
—❑+ —❑+
—❑+ —❑+
NEMA 3R
V 6"BY6"
_
15 LG ELECTRONICS
315 WATT MODULES,
15 ENPHASE M250
1z
MICROINVERTERS
#6 AWG EGC
GROUNDING MID CLAMP
PV ARRAY INFORMATION
24 LG ELECTRONICS 315WATT SOLAR MODULES
MODEL # LG315N1 C-G4
24 ENPHASE M250 MICROINVERTERS
MODEL # M250-60-2LL-S2X
NUMBER OF BRANCH CIRCUITS: 2
NUMBER OF MODULES IN BRANCH CIRCUIT a: 9
NUMBER OF MODULES IN BRANCH CIRCUIT b: 15
MAX WATTS STC: 15 * 315W = 4875W
PV MODULE RATINGS # STC
SHORT CIRCUIT CURRENT I -SC = 10.02A
MAXIMUM POWER CURRENT I -MP = 9.50A
OPEN CIRCUIT VOLTAGE V-OC = 40.6V
MAXIMUM POWER VOLTAGE V-MP = 33.2V
.INVERTER RATING
PEAK PWR TRACKING VOLTAGE = 27-39 V
CEC EFFICIENCY
= 96.5 %
ENCLOSURE: NEMA6
MAXIMUM INPUT CURRENT
= 10 A
MAXIMUM OUTPUT CURRENT
= 1.0 A
MAXIMUM INPUT POWER
= 210 - 300 W
MAXIMUM OUTPUT POWER
= 250 W
[ ACA ] FROM PV MODULES TO J-BOX
(3) ENPHASE TRUNK CABLE #12 AWG, PV WIRE
+ (1) #6 AWG BARE CU EGC FREE IN THE AIR
[ AC.2 ] FROM J-BOX1 TO J-BOX2
(3) #10 AWG THWN-2 + (1) #8 AWG CU EGC,
3/4" EMT TYPE CONDUIT, 50 FEET
[ AC.3 ] FROM J-BOX2 TO MAIN SERVICE PANEL
(6) #10 AWG THWN-2 + (1) #8 AWG CU EGC,
3/4" EMT TYPE CONDUIT, 45 FEET
# OF MICROINVERTERS IN BRANCH CIRCUIT a: 9
EACH INVERTER OUTPUT MAX CURRENT: 1.0 A
BRANCH CIRCUIT CURRENT: 9 * 1.0 *1.25 = 11.2 A
BREAKER SIZE PER B. CRCT - 15A
# OF MICROINVERTERS IN BRANCH CIRCUIT b: 15
EACH INVERTER OUTPUT MAX CURRENT: 1.0 A
BRANCH CIRCUIT CURRENT: 15 * 1.0 *1.25 = 18.8 A
BREAKER SIZE PER B. CRCT - 20A
MAXIMUM CONTINUOUS CURRENT: 18.8 A
All the photovoltaic systems wires that on the roof and
side of the building shall be protected against physical damage
RACEWAY HEIGHT FROM THE ROOF 3 2" (TEMP - 39 + 17 = 56C)
TEMP. DERATE FACTOR - 18.8 A 10.71 = 26.5 A
MORE THAN 3 CCC ADJST. FACTOR (6 WIRES) - 0.8
ADJUSTED CONDUCTOR AMPACITY - 26.5 10.8 = 33.1 A
WIRE SIZE FROM NEC TABLE 310.15(b)16 - 10 AWG
AMBIENT TEM FACTOR 0.71 PER NEC 310.15(b)(2)(a)
AC.
3/4" EMT
CONDUIT
45 FEET
MAIN PANEL RATING
200A TOP
INSTALL 2P
15A CB(PV)
AT OPPOSITE END
OF BUS FROM
MAIN FEEDER CB
INSTALL 2P
20A CB(PV)
AT OPPOSITE END
OF BUS FROM
MAIN FEEDER CB
EXISTING GROUND ROD
UTILITY
M
r�
N METER
EXISTING
200A MAIN
SERVICE PANEL
120/240V
1 P,3W, #3/0 AWG
rot
r
EXISTING SPLIT PHASE: 3W, 120/240V
BUSBAR RATING = 200A
MAIN SERVICE BREAKER = 200A TOPFEED
120% RULE:
MAX ALLOWED FEED: 240A
PV BACKFEED BREAKER SIZE: 20A + 15A
ACTUAL FEED:
200 "MSP" + 35 A "SOLAR" = 235 A <= 240A MAX
OUTPUT CALCULATIONS
PV SYSTEM MAX DC OUTPUT:
24 * 315W = 7560W
PV SYSTEM MAX AC OUTPUT:
(24) LG315N1 C-G4
(24) M250-60-2LL-S2X
Pmax (PTC Rating) PER MODULE: 287AW
287AW * 24 = 6.89 KW
6.89 KW * 96.5% CEC INVERTER = 6.66KW
General Notes
SINGLE LINE
DIAGRAM
Drawn By: David D.
No.
Revision/Issue
Date
CONTRACTOR
Highlight Solar Inc.
Address:
1624 Remuda Lane,
San Jose,
CA 95112
Phone Number:
(866) 926-9997
Lid# 960376
X
of l`
Michael McMillion
10225 Carmen Rd,
Cupertino, CA 95014
not.
April 12, 2016
S.A
2
AS INDICATED
PV SYSTEM
O
O
(STICKER TO BE LOCATED ON
CONDUIT WITH DC CURRENT
EVERY 4' HORIZONTALLY OR
10' VERTICALLY AND 1' FROM
EACH SIDE OF A BEND)
H
O
(TO BE LOCATED ON
SUB -PANEL ONLY
WHEN SUB -PANEL IS
DEDICATED FOR PV ONLY)
N
01
(i1
(STICKER LOCATED
INSIDE PANEL
NEXT TO SOLAR BREAKER)
(STICKER LOCATED
INSIDE PANEL
BELOW PV BREAKER)
(STICKER LOCATED
ON THE PV SUB PANEL)
Permanent directory or plaque providing location of service disconnecting
means and photovoltaic system disconnecting means, if not located at the
same location. (Plaques shall be metal or plastic, with engraved or machine printed
letters, or electro-photo plating, in a contrasting color to the plaque. Plaques shall be
permanently attached to the equipmenq or in the required location using an approved
method that is suitable to withstand the environment to which it is exposed. Plaques
and signage shall meet legibility, defacemet, exposure and adhesion requirements of
Underwriters Laboratories marking and labeling system 969(UL969).
Plaques will have red background & white lettering.
MARKINGS, LABELS AND WIRING SIGNS
A. Purpose: Provide emergency responders with appropriate warning and
guidance with respect to isolating solar electric system.
This can facilitate identifying energized electrical lines that connect solar panels
to the inverter, as these should not be cut when venting for smoke removal
B. Main Service Disconnect.
1. Residential buildings - The marking main be placed within the main service
disconnect. The marking shall be placed — A
outside cover if the main service disconnect is operable with the;servicptpaR I
:...;;. 3
closed. T .zrx
2. Commercial buildings - Tha marking shall be placed adjacent tdtin;
service disconnect clearly visible from the location where the levdl'li,o'perated+
3. Markings: Verbiage, Format and Type of Material.
a. Verbiage: CAUTION: SOLAR ELECTRIC SYSTEM CONNEGTED`'`�
b. Format: White lettering on a red background. Minimum 3/8 inches letter
height. All letters shall be capitalized. Arial or similar font, non bold.�1F�!!�`�R�C
c. Material: Reflective, weather resistant material suitable for the enVi lament
(use UL - 969 as standard for weather rating). Durable adhesive materialsgUqeBv:
this requirement.
C.Marking Requirements on DC conduit, raceways, enclosures, cable
assemblies, DC combiners and junction boxes:
1. Markings: Verbiage, Format and Type of Material.
a. Placement : Markings shall be placed every 10 feet on all interior and exterior
DC conduits, raceways, enclosures, and cable assemblies,
at turns, above and for below penetrations, all DC combiners and junction boxes
b. Verbiage: CAUTION: SOLAR CIRCUIT Note: The format and type of material
shall adhere to "V. V-3b, c" of this requirement.
c. Inverters are not required to have caution markings
1.Marking is required on all interior and exterior DC conduit
raceways,enclosu res, cable assemblies,and junction boxes,combiner boxes and
disconnects.CFC 605.11.1
2.The materials used for marking shall be reflective,weather resistant material
suitable for the environment.
Minimum 3/8 "letter height; all upper case letters Aria[ or similar font; Red
background with white lettering. CFC 605.11.1.1
3.Marcking shall contain the words: WARNING: PHOTOVOLTAIC POWER
SOURCE. CFC 605.11.1.2
4.Marcking shall be placed adjacent to the main service disconnect in a location
clearly visible from the location where the disconnect is operated CFC 605.11.1.3
CAUTION
POWER TO THIS BUILDING IS ALSO SUPPLIED
FROM THE FOLLOWING SOURCES WITH
PV EQUIPMENT LOCATED AS SHOWN:
SERVICE POINT &
UTILITY METERING
0
SOLAR PV ARRAY WITH
n
MICROINVERTERS ON ROOF
a
❑ 0
11
SOLAR PV ARRAY WITH
MICROINVERTERS ON ROOF "®
INVERTER TYPE: MICRO
..
General Notes
CODE REQUIRED
SIGNAGE
Drawn By: David D.
Department
Building
0CE
No.
Revision/laaue
Date
CONTRACTOR
■..ate
Highlight Solar Inc.
Address:
1624 Remuda Lane,
San Jose,
CA 95112
Phone Number:
(866) 926-9997
Lic# 960376
X
Michael McMi//ion
10225 Carmen Rd,
Cupertino, CA 95014
April 12, 2016
a..
3
sad.
AS INDICATED
PV SYSTEM
UNIT INDEX
o°
MSP (E) 200A Main Service Panel
SITE PLAN
FLASH MOUNTING DETAIL
MODULE WEIGHT (Ibs)
37.5
# OF MODULES
24
TOTAL MODULE WEIGHT (Ibs)
900
RACK WEIGHT (Ibs)
180
MICROINVERTERS WEIGHT (Ibs)
106
TOTAL SYSTEM WEIGHT (Ibs)
1186
# OF STANDOFFS
80
MAX SPAN BETWEEN STANDOFFS (in)
48
LOADING PER STANDOFF (Ibs)
14.8
TOTAL AREA (sq.ft.)
432
LOADING (PSF)
2.74
1. Dual Rack Racking System
2. Dual Flashed L-Kit Attachment
3. Racking loading calculations were performed for ASCE 7-10 wind speeds @ 110 mph for B and C exposure categories and ASCE 7-10
Seismic Design Category E.
4. Roof attachment hardware to be mounted to existing structure (2"x8"@24" O.C. Trusses) at 48" O.C. rail spans or less.
5. Lag bolts are 5/16" X 3.5" stainless steel with 2.5" minimum embedment into the roof rafters.
6. Roof sheathed with 1/2" plywood and upper surface is faced with felt paper. Finished roof surface is Asphalt Shingle.
7. Mounts or/and mounting hardware will be sealed with Tremco Vulkem 116 Polyurethane Sealant or equivalent.
ocking
ind Brace
am
r�af��fEE y
DUAL RACK FLASHED L-KIT ATTACHMENT
DUAL RACK RAIL
EXISTING 2" BY 8" @24" O.C. ROOF TRUSSES
UP
General Notas
ATTACHMENT
LAYOUT
Drawn By: David D.
No.
Revision/Issue
Date
CONTRACTOR
Highlight Solar Inc.
Ad d ress :
1624 Remuda Lane,
San Jose,
CA 95112
Phone Number:
(866) 926-9997
Lic# 960376
X
a,
H j.d N.. 4 A*—
Michae/ McMi//ion
10225 Carmen Rd,
Cupertino, CA 95014
Dm,
April 12, 2016
5
sue.
AS INDICATED
PV SYSTEM
Enphase', Microinverters
Enphaseq,M250
r 6
The Enphase' M250 Microinverter delivers increased energy harvest and reduces design and
installation complexity with its all -AC approach. With the M250, the DC circuit is isolated and insulated
from ground, so no Ground Electrode Conductor (GEC) is required for the microinverter. This
further simplifies installation, enhances safety, and saves on labor and materials costs.
The Enphase M250 integrates seamlessly with the Engage Cable, the Envoy' Communications
Gateway'"', and Enlighten', Enphase's monitoring and analysis software.
p r nT:
�UlEdlrt✓ �e�,�Itl�rGt
Ly®1�;�i'� 9�5�
Enphasel!l M250 Microinverter // DATA
INPUT,DAU (DC)
M250-60-2LL-S22/S23/S24
Recommended input power (STC)
210 - 300 W
Maximum input DC voltage
48 V
Peak power tracking voltage
27 V - 39 V
'Operating range
16 V - 48 V
Min/Max start voltage
22 V / 48 V
Max DC short circuit current
15 A
Max inpu[ current
10 A
OUTPUT DATA (AC)
@208 VAC
@240 VAC
Peak otltput. power
250 W
250 W
Rated (continuous) output power
240 W
240 W
Nominal output current
1.15 A (A rms at nominal duration)
1.0 A (A rms at nominal duration) `
Nominal voltage/range
208 V / 183-229 V
240 V / 211-264 V
Norninal frequency/range
60.0 / 57-61 f Iz
60.0 / 57-61 Flz
Extended frequency range"
57-62.5 Hz
57-62.5 Hz
Power factor
>0.95
> 0.95
Maiiimum units per 20 A branch circuit
24 (three phase)
16 (single phase)
Maximum output fault current
850 mA rms for 6 cycles-
850.mA rms for 6 cycles '
EFFICIENCY
CEC weighted.efficiency, 240 VAC 96.5%
CEC weighted efficiency, 208" VAC 96.0%
Peak inverter efficiency 96.5%
Static MPPT efficiency (weighted, reference EN50530) 99.4 %
Night time power consumption
MECHANICAL DATA
65 mW max
Ambient temperature range
-4&C to +65°C
Operating temperature range (internal)
-400C to +85°C
Dimensions (WxHxD)
171 mm x 173 mm r. 30 mm (without mounting bracket)
Weight
2.0 kg
Cooling
Natural convection - No fans
Enclosure environmental rating
Outdoor - NEMA 6
FEATURES
Compatibility Compatible with 60-cell PV modules.
PRODUCTIVE
SIMPLE
RELIABLE
Communication Power line
- OptirYtized`for higher -power
No GEC needed for aiicroinverter
- 4th-generation product
Integrated ground The DC circuit meets the requirements for ungrounded PV arrays in
modules
No DC.design or string calculation
More than 1 million hours of'testing
NEC.690.35. Equipment ground is provided in the Engage Cable. No
- Maximizes energy production
reciuired
and millions of units shipped
additional GEC or ground is required. Ground fault protection (GFP) is
integrated into th ,microinverter.
-,Minimizes impact of shading,
Easy installation with Engage
- Industry -leading warranty, up to 25
Monitoring Free lifetime monitoring via Enlighten software
dust, and debris
Cable
years
Compliance UL1741/IEEE1547, FCC Part 15 Class B, CAN/CSA-C22.2 NO. 0-M91,.
'0.4-04, and 107.1-01
' Frequency ranges can berextended beyond nominal it required by the utility
[9,1 enphase,
®
C
To learn more about Enphase Microinverter technology, 1enphase-
J E N E R D 1
J E N E R G Y
C US
visit enphase.com
0 2013 Enphase Energy. Nl.rights.re ervcd.:Vl tndemvlcs or brands in this docurfient are registered by thcr rcspectwe o'dmer.
General Notes
INVERTER
DATA SHEET
Drawn By: David D.
No.
Revision/Issue
Date
CONTRACTOR
Highlight Solar Inc.
Address:
1624 Remuda Lane,
San Jose,
CA 95112
Phone Number:
(866) 926-9997
Lic# 960376
X
wgea r.. • ,&—
Michael McMil/ion
10225 Carmen Rd,
Cupertino, CA 95014
Dee.
April 12, 2016
a.a
6
Sow
AS INDICATED
RM�
PV SYSTEM
LG
Life's Good
LG's ne:v module, LG NeONT" 2, adopts Cello technology.
Cello technology replaces 3 busbars with 12 thin wires
to enhance output and reliability. LG NeONTI 2
V
AP"rROVEO PRODUCT
power
60 cell demonstrates LG's efforts to increase customer's values
D E c ua
p
beyond efficiency. It features enhanced warranty, durability,
InteRek
isrr�s,21s
performance under real environment, and aesthetic
rawtsra
P tin m m'Ja
design suitable for roofs.
111111�
Enhanced Performance WarrantyHigh
III II�
g Power Output
i�►,i;;i;i�
LG NEON' 2 has an enhanced performance warranty.
g
Compared with previous models, the L.G NeON" 2
�IIiI`
The annual degradation has fallen from -0. ` elyr to
has been designed to significantly enhance its output
�11111}}I}Il4
-0.6° •;yr. Even aft_ i 25 years, the cell euarancees 24%p
efficiency, thereby making it efficient even in limited.space.
more output than the previous LG NeONTh1 modules.
c: h
Aesthetic Roof
di —will
Outstanding Durability
@itltl
MUMS
LG NEON' 2 has been designed with aesthetics in mind;
clogi:ec:ee�e
trvith its newly reinforced frame desir_.q LG has attended.
Eo10' EIECBo=
thinner mires thatappearall black at a distance.
-5loot".INHHo3
the warranty' of the LG NEON" 2 for an additional
__ --
The product may help increase the value of
�i"`"r'1r°-
2 Yeats. Additionally, LG NeON- 2 can endure.a front
a property. with its modern design.
load up to 6boo Pa, and a rear load up to S400 Pa.
h�� a
Better Performance on a Sunny Dayi
Double -sided Celt Structure
a�€aoi, asE
LG NEON— 2 now performs better on sunny days thanks
s�iiixtr
�
The rear of the bEtl used in LG NeON 2 will contribute to
iaeteee€see 4a
Eza... •Fi
to its improved temperature crrefficiency.
e
t�€�=4 ir18�
geiieration,justliketh front; the light beam reflected from
ldlulumip
ref-=�
P31L L'.-i:%
the rear of the module is reab:orbed.to generate agreat
amount of additional power.
Abeet LG Electronics
LG. E(ect-onics i.. ) .i•.I r:Ayer Mho has tMPn r'+'iaavcicn eMpandlo Jts-paclty, based on solar e x9y bu:irez as its firzurP growth entire. We. embarked on a :olsr nr my soLa;e :eseerch. program to
1985 supported by Wrraup's rich experience In semi-mnrluct*•t LED chem(stry and materials Industry We successfully released the first Mono Xs series to the market In 20iO w1iIch %ere WOrted 1032
co•_noin in he r: Ilet°an3 2 years, the rafter In 2G13. LG WON (p ,,., r p ki,6, in as ),Ir . X- *OK) Aron "Inre olar Avami', whichprn%�ed LG is r.v It &r of ionovation ir, th. nt:iisriy
Mechanical Properties
Cells 6 x 10
Celt Vendor LG
Celt Type
Monoaystalliine % N-type
Cell Dimensions
156.75 x 15b:75 mm 16 inches
u of Bulbar
12 iMuld %N.re 6us1w.r) + `
Dimensions (L x W x H)
1640 x 1000 x =.0 nun
6457 x 39.37 x 1.57 inch
Front Load
6000 Pall 25 psf
Rear Load
5400 Pa! 1 13 psf 4*
—..--�_.
--------
Weight
--._........... —
17.0 t- 0.5 kg / 37.48 t 1.1 Ibs
Cnnn—wrlype
•1C4, 1ACd Comparble, IP67
Junction Box
IP67 with 3 Bypas, Diodes
Length of Ce:,tes
Glass -------------------
2 x 1000 mm / 2 x 39.37 indi
-- Hign Transmission tempered Glass
Frame
Anodized Alurn njin
Certifications and Warranty
Certifications IEC 61215, iEC 61730-1 /-2
IEC 61_7'16 (Anvnonia Test)
IEC 6170 1 (Salt w1Lt, Coro-sion'T6,;Q
GO 9001 - -
UL
Module. Fire Performance (USA) Type 2 (LIL 1 iO3)
Fire Ratin (for CANADA) Class C(_ILC;ORD C1703)
Product warranty 12 years
Output Warranty or Pmax Linear warranty`
^ Ii IKWA _r i _ _. s xi_N.%3)53.6%
Temperature. Characteristics
rdOCT 46 = 3'C
_Voc_ -0,22 `o/'C
Ise ..__------------- G.034=;"C---------- ---
Characteristic Curves
� E.M F.netV
eM eom:J
!OS 'JC:Y
I00:V
oco sac ,cite ',sx ?i:ro :sco a�a as.c> >a.x aso;
OLG N;.rthA ,ca Sui..r Bu ne sTe<m
LG.Etcctroc-L5:11 -
Clfe's Goa 1 Cii C SyIa Ave Engler,eod Cli'r-, NJ 0753'_
f 5 I AIA n. r 1,J P m Eq
vrww.g,cia� usacom
Lj-1
tJ
Electr teg r%R\4i9s (STC�*)
Module Type -ri
MPP' aLaw�VQ)
33.2�
MPP CUT tent '(Irnpp)
9,50
Open Circuit Voltage (Voc)
40.6
Short Circuit Current(lsc)
10.02
Module Efficiency (%)
19.2
Operating Temperature (°C)
-40 -+90
Maximum System Voltage (V)
1000
Maximum Series Fuse Rating (A)
20
.—.__.._..------......_.......... _.... --..... ------------.__._
Power Tolerance.(%)
0- t-'
'The typl.1 duvnve In ud,le a„s r y. 200 W1m inreiamn to 1GOO W,'If is -ZOK
Electrical Properties (NOCT*)
Module Type 315 LN
Maximum Power. (Prnm) 230
MPP Voltage (Vmpp) 30.4
N1PP Current (tmpp) 7.58
Open Circuit Voltage (Voc) 37.E
Short Circuit Current (isc) 6.08
'JVOCTit4ore,x1 Jpceng:C61 R,7p>,aun1I:..6-:e 50C 7.'irh'.—t;ur,-e;vI,aw,r 20'i,•Mrd epc: d 1!r.:c
Dimensions (mm/in)
I� C,
I I I
i
� c�'
r,<tEaambr:c:cezV.. :terott`'e
Pmdu-tspeunutiorn are suLjectto ctwnge v.•itho,c� notice
D5442bD C -F-EN - 504 :7
Copyright V 1-01 S. G nectronia, All .Hghts reservod
av •oe M r •I5
Innovation fora Better Lire A
q
r
General Notes
MODULE
DATA SHEET
Drawn By: David D.
No.
Revision/Issue
Date
CONTRACTOR
rtm, rn A clew
Highlight Solar Inc.
Add ress:
1624 Remuda Lane,
San Jose,
CA 95112
Phone Number:
(866)926-9997
Lic# 960376
X
Michael McMillion
10225 Carmen Rd,
Cupertino, CA 95014
Dora
April 12, 2016
1.A
7
sods
AS INDICATED
P-W
PV SYSTEM
AUTHORIZATION TO MARK
This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s)
Covered section when made in accordance with the, conditions set forth in the Certification Agreement and Listing
Report. This authorization also applies to multiple listee model(s) identified 'on the correlation page of'the Listing
Report,.
This document is the. property of Intertek. Testing Services and is not transferable. The certification marks) may be
applied only at the location of the Party:Authodzed To Apply Mark
Applicant:, LIG Electronics Inc.
168, Such6I-daero, Solar,Biisiness
Division (Solar Factbry),.Gurni-si;
Address:
Gyeongsangbuk-rib 730-903i Republic
of Korea
Country:
Republic of Korea
Contact:
Mr. Jeon,gwon Choi'
Phone:
+82-54-4690386
FAX:
+82-5:4-4607931
Email:
jeongwon7.choi@lge-.cam
Manufacturer: LG Electronics Inc.
168, Suchul-daero; Solar Business
Division: (Solar Factory); .Gumi-si,
Address:
Gyeongsangbuk-do 730=903, Republic of
Korea
Country:
Republic of Rorea
Contact;
Mr- Jeongwon Choi
Phone:
+82-54-4690386
FAX:
+82-54-4607931
Email:
jeongwon7.choi@lge.com
Party Authorized To Apply Mark: Same as Manufacturer
Report Issuing'Office: Infertek Testing Services Shanghai
Control Number: 5000343 Authorized by
Thomas J. Patt'e M, COrtificatjd4i Manager
I
To US i
Interteki
This document,supersedes all previous Authorizations to Mark for the noted Report Number.
This Auf dzation to Mark is [or the exclusive use of Inlertek's Client and is provided pursuant to the Certification agreement between Intertek and its Client. Intertek's responsibility -and liability are
limited to the terms and conditions of the, agreement. Intertek assurnes no liability to any party, other than IU the Client In accordance with the agreement, for any loss, expense or damageoccasioned
by the use of this Authorization to Mark. Only the Client is authorized to permit copying ordistribetlon ofthis Authorization to Mark. and then only In its entirety., Use of Intertek's Certification mark is
restricted to the conditions laid out in the agreement and in this Authorization to Mark..Any further use'of the Intertek name for the sale or advertisement of the tested material, product or service must
lirsl be approved in writing by Intertek. Initial Factory Assessments and Follow up.Seivims are for the purpose of assuring appropriate usage of Me Certification mark in accordance with the
agreement, they are nolfq the purposes ofpruduction quality wntiol and donet relieve the Client of lheirobtigations in this respect.
Intertek.Testing"Services NA Inc.
545 East Algonquin Road, Arlington Heights, IL 60005
Telephone 8007345-3851 or 847-439-5667 Fax 312-283-1672
UL 1703 2002/03/15 Ed:3 Rev:2014/11118
Standard(s): UL Standard for Safety Flat -Plate Photovoltaic'Modules and Panels
Product: Crystalline.Silicoh Photovoltaic modules
Brand Name: ' L EleIct, onics
LGxxxN1.C-G4 ('xxx' is the number from 28p to 340, in step of 5j,
LGxxxN1W-G4 (xxx'.is the numberfrom 280 to 340, in step'of 5),
Models, LGxxx81.C-G4 ('xxx''is the number from 250 to 300, in step of 5),
LGxyxS1 W G4 ('xxx' is the number from 250 to 300, in step of 5),
LG)=N1 K-G4 ,('xxx' is the number from 280 to 330, in step of 5).
ATM for Report 1150201020SHA, 001 'Page `1-of'l
ATM Issued: 28-Apr-2015
ED16:3,15 (1Jen-13) Mandatory"
I r� �O .14aT Murphy Drive
Middleton, WI 53562 USA
Telephone: 608.836.4400
Facsimile: 608.831.9279
www.intertek.com
In the basls..of the tests undertaken,athe sample(s) of the below product -have been found to;complywith the requirements of
the;refer6nced specifications at the 'time _the testsaivere carried`out_
Applicant Name &.Address: Dual. RackInc.
241N. '10" St.,Unit4
Sacramento, CA 9581:1
USA .
Product Description: Flush mount photovoltaic rack.,
Ratings & Principle ,Fi-re'Class Resistance Rating:
-Characteristic's. -Class A Fire Rated for Steep Slope applications when using Type 2, listed photovoltaic modules:
System.tested with a 5" gap'(distance-between the bottomthe module frame<and the roof
covering); per the U.L 1703 standard this system can. be installed at any gap.allowed by the '
_- °tnanufacturersinstallattion instructions. Installationperper the manufacturer's_installation .
instructions: No;petimeter guarding is required. Wind skirt`s`areoptional'.
Models
,Brand Name:
Relevant Standards:
Verification issuing Officer
Date of Tests:
Dua(Rail PV. Racking,System
Fortune Energy Dual Rail ,.
UL Subject,2703 (Section 15.2 and 153) Outline of Investigation for Rack. Mounting Systems, and
Clamping Devices ,for Fiat -,fate Photovoltaic Modules and Panels, First Edition, January 28, 2015
Referencing UL1703 Third Editibn(Section 31.2) Standard for Safe.ty;for Flat -Plate Photovoltaic
Modules and Panels, Oct. 2015.
Intertek Testing Services'I Inc.
8431 Murphy.Drive
Middleton, WI 53562
10/07/,2015-10/27/2015
Test.Repoef Nurnbet(s): 1102283397MID-001
This.verification.is part of the full test report(s) and should be read in conjul
imply producfcertification'.
Completed by: Chris'Zimbrich Reviewed by:
Title: Technician II, Fire Resistance Title:
Signature: l� � i >Signature:
Date: 10/30/201S Date:
With them. I his report:aoes not au[omaticauy
Gregory Allen
EngineeringTeam Lead; Fire Resistance
n ,
10/30/20T5
This Verificc tion is for the exclusive use of.Intertek's client and is provided pursuant to the agreement between Intertek and Its Client. hitertek's responsibility and liobility are
krnitcd�to, the terms and'conditions of the agreement. Wertek assumes no liability, to any por ty, other thonto the Clienbin.accordpnce :vith the agreement, for any loss, exrpgnse
oriinmage,orc-ns9orted fry the use of this Veiilication. Qnly the Client is nuthorrzed to perrniI copying or distribution of this Ve il-ication. Any use:of the intertek name crone vriLs
marks for the sole oradverriscmentof the tested material, product or service mcstfirst beapproved ,in writing by intertek. The observations and testlinspection results
referenced "in this Verification are relevant only So the sample tested/inspected. This Ver!fcntion by.itself does not imp!y that the maferiaf, product orservice Is or has ever been
under on lnte. II certification progrurn.
6FT-OP-11a (24-MAR-2014)
General Notes
MODULE & RACK
CERTIFICATION
Drawn By: David D.
No.
Revision/Issue
Date
CONTRACTOR
Rm em. • A* —
Highlight Solar Inc.
Address:
1624 Remuda Lane,
San Jose,
CA 95112
Phone Number:
(866) 926-9997
Lic# 960376
X
_z�Ei fr
� igMig It Solar
R.J nm. •Arlo
Michael McMi//ion
10225 Carmen Rd,
Cupertino, CA 95014
De.
April 12, 2016
s.a
8
soak
AS INDICATED
Rkna
PV SYSTEM
Dual lack
PV MOUNTING SYSTEMS
DUAL RACK-
11111in
,
Dual Rack rails were designed to be customized for
solar PV arrays on residential and commercial projects.
They are engineered for strength and durability and tested
for spans of up to eight feet. Installers prefer Dual Rack
rails because they are strong, reliable, time saving, and
available at the best price in the marketplace.
ADVANTAGES A`1ET
11 Advanced.Dual Rack design 07 11
• PE.Certified in 16 states IITY N.o. a'78i
91 No special training required �� \ 11
• Save time and money on installations \ of CC
• Less parts, two ways to install
• 3 sizes available: 12', 14' & 11' - in silver & black
• 10 year limited warranty
• Conforms to UL STD 2703 and Class A Fire Rated
EfL%§_
CCLLASSIFlm
us
Intertek
a000799
Lont•rms to UL SUe 2703
TRIM
Product
Item #
Product Name
ST-144-C,
Standard Rail 144' - Clear
ST-168-C
Standard Rail 168- - Clear
ST-204-C
'Standard Rail 204' - Clear
ST-144-B
Standard Rail 144' - Black
ST-168-B
Standard Rail 16T -Black
ST-204-B
StandardRail 204' - Black
`Ma`terial`S�ecificattons
�w� _�_ ��_s�u_�
Material Designation
6005 T5
Density (p)
168.56 Ibs1fi' (2.7 g/cm')
Coefficient of Thermal expansion (a7)
1.306E 05/'F(2'.35E-05!°C)
D ttusivity(X)
200A0 Wfm-'K
Modulus of Elasticity (E)
10.152E06' Psi (7,000 kNlcros)
Shear Modulus (G)
3.916E06 Psi (2,700 kN/cm')
- Mechanical Properties
_
_ _ _ � � �,.
Tensile Strength:(f.a)
38.0 Ksi (26.0 kNlcm)
Tensile Yield Strength (f yk)
35A Ksi (24.0 kNlcml)
Profile Wall Thickness
(t:5 0.39 in/100 mm)
Section Pr,certies
I:
0.383 in'
V6
0.334 in-
lY
0.206 in°
Wr
0.262In' .
A
0.581 in'
Weight
6.68 lbs/it
Standard 'Packaging 6 pcs
Dimension 140168'/ 204"
Weight 0.68 lbsIR
Rail SPan':(ftl)
EXP
8
Wind Speed
(Mph):
110 I
120 1
130
140
1e0
�160
170
160
17o
Zone _....._. _... _ -
Snow Load (pA
0- 10.0 -2o.a X0 40.0 JSl16
8.0.... 7.0 6.0 5.0 4.5- 1 4.0
8 Ojy7.0 6.0 5.0" 4.5 I 4,0
8.0 L ;G 6.0, 5.0 4.5 .4.0
8.0 I TO 6.0 5.0 4.5. 4.0
7.5 TO 6:0 5.0 4.5 I 5
'7.0 - 7.0 6.0 .5.0 4.5 ! 4.0
7.0T 7,01 6`.0_ s:a ( _4,5'. I 4.0
6.5 0.5 i 5.5 5.0. ! 4.5 '�- 4.0
o 7 6 6.0 5,C 4.5 1 4.0
120
8.0
7.G
6.0
5.0
4.5
I 4.0
C
_ 140
150
_7.0
Z.0
6.5
_ 6.0 _
_ 6.0
5.5
5.0
�5`.0
; '5.0
_a.5_�
4.5
4.5
4.0
4A
( 4.0
too
_6.S
f.0
6,1)
I 5.5
5,0
4.5
4.0 ,
5,5
5.5
5.5
5.0
4,5'
4.0
180
5.5
5.5
5_5
5.0
A Tho IbNe'tcse ONLY t dud3 PU31 RX_A. @tl ca't icly n Nos MtjmLide 2x aRcWor, a My wpamrf -rgGK
6.w5nde.Ac teyuryiIWASCE710. C TcpN.Whicfacicr,l¢tis1.0. O Maanurtrnkan tiwlliMyht is 307_
E.Aua:neparepettxyMuO:L F.:tuclphhistrty 7dedree.'127deyr
a: h'arJman sulErpa�l weFyht L9.50 Ds: H. Height d Solar ravel is between 2'-ana 10- to rcot
.See-Zone,2,8 3 span. table calculation in,lnslallatlon ManuaL'P.E. ceA ficad6n.
Dual lack
Pi'- MOUNTING SYSTEMS
Dual Rack -Standard Rail
I:0
InsaIlatioYi
e a
Dual Rack is a robust, long -life photovoltaic (PV) module mounting system for both,flat and pitched roof. It consists of aluminum rails, roof attachments and
all necessary small parts to ensure -a safe installation. Dual Rack allows modules to be mounted in both landscape and portrait orientations.
• Dual Rack technology can be installed in two different ways: Top down attachment style and L-Footstyle
TOP DOWN
• Measure and mark location of each standoff
to roof connection.
• Drill 318' hole through Dual Rack standard rail
for each.standoff location
• Attach standoff to roof with 5116' lag screw.
Attach Dual Rack. standard rail to standoff with
3/8' bolt and washer period.
L-FOOT STYLE
After securely installing standoff to rafter, attach
L-foot with 3182 bolt and nut to Dual Rack
standard rail at desired height
Dual Rack L-foot enables height adjustment up
to 1.1 inches.
y.Contact Info � _'�: `Distr'Uutor Info �„
Dual Rack Inc.
241 N. 10th street, # 6.7
Sacramento, CA 95811
' 916-492-2797
General Notes
RACKING
DATA SHEET
Drawn By: David D.
No.
Revision/leeue
We
CONTRACTOR
Highlight Solar Inc.
Address:
1624 Remuda Lane,
San Jose,
CA 95112
Phone Number:
(866) 926-9997
Lic# 960376
x
Ro}d Iles ! Aim
Michael McMillion
10225 Carmen Rd,
Cupertino, CA 95014
Me.
April 12, 2016
3h t
9
sod.
AS INDICATED
PV SYSTEM
3wldiing DcPa�trner.`
i-IT i �flL`ly`f`
Dual lack t t - an 4R,
fisio-7r.tf s"+ .tb Ylt3iu_.a_Racy
vvMOLNT1NG SYSTEA19CV MOU\T1NG SYSTEMS lL
C—`Rt
sI �R
sTf��ire tttr; 'atlNl vtyt' } i�eiesc�3✓ivSir,,:l
GROUNDING LUG
The Dual Rack GBS-P6 is a grounding bonding splice lug
that is compatible with all solar racking systems and framed
solar modules. The Dual Rack GBS-P6 is the first lug that
is not only a grounding, it is also a grounding jumper as
this can be installed at spliced section of railing. This will
keep onsite inventory lower with the multipurpose lug that
works to ground and bond solar PV modules and racking
systems. With the Dual Rack GBS-P6 you will find only
lower cost and faster installations with the only grounding
bounding splice lug on the market to be UL467 certified and
UL2703 recognized
ADVANTAGES
• Compatible with Dual Rack PV mounting system
41 Easy installation save time
• Electrically bond the solar modules together
• Mechanically clamp solar panels in place
• Made from stainless steel 1.4301
• Lock -time bolt for secure attachments
• Compatibale with 12-6 AWG Cu.
• UL 467 Certified and UL2703 recognized
En CLSSIRED
Ua
�o
ProductLine v
Ilerrdt Product Name
DR,GBS-P6 DR Grounding Bonding Splice Lug
Mafefiai Specifications
_ _.
=
Material Designation
Stainless steel 1.4301
Chemical Formula
X5MH810
Hardness
A2-70
Density (p)
493.2 lbr dft' (7.9 glcm')
Coefficient of Thermal expansion'(q�
2.88E-051°F (1.60E-051-C)
Diffusivity (A)
17.00 W/m-°K)
Mddulus of Elasficity(E)
35.50E06 Ibr ff (17,000 kN16MI
ShearModulus(G) _
13.47E061bM?,(6,450kN/cm)
Idatenal
Grounding Lug
01
Back Plate
01
318' Hex Nut
01
°ETeetrtcal°°:` p� _.
Voltage: Up to 1000V DC, 480VAC
Short Term Current Test (UL 457) 6AWG 1530A(6 Seconds).
pp>lication8
Solar panels and related photovoltaic products require groundng per the National Electric Code.(NEC Article
690.43). These applications include, but are not limited to electrical grounding of solar modules and roof tiles
GROUNDING
MID CI.AlAMP
Product Line�__.__a
Item # Proclu^t Name
DR-GMC-01 DR Grounding Mid Clamp
gate4Specifications.-;Grounding Mid Clanip�.
Material Designation
Stainless steel 1.4301-
Alloy
X5CrNH810
Hardness
A2-70
Density (p)
6.29 Ibm/in' (7,9&nfl
Coefficient of Thermal expansion (a)
8:9E-06/`F(1.60E-051-C)
Modulus of Elasticity (E)
24,677.4 KipAr � (17,000 kN/cm`)
Shear Modulus (G)
9,362.9_ Kip[W(6,450.00 kN/cm�
1Vlatcrial Specificahons�Channel Str.,iit e w
Material Designation
6005=T5
Density (0)
168.56 Ibs/fe (2.7 glom')
Coefficient of Thermal expansion (a)
1,306E-051-F(2.35E-051°C)
Diffusivity (A)
200.00 W/m-°K
iAodulus of Elasticity (E)
10.152E06 Psi (7,000 kN1an')
Shear Modulus (G)
3.916EC6 Psi (2,700 kN1cm2')
Dual Rack stainless grounding mid clamp has been tested
COm Onellt L1St u.
_ .��
and certified to UL 2703. With advanced design, each
Material
Mid•Clamp
o
'01
grounding mid clamp pierces through the anodized coatings
channel Strut.
01
Lock -Tight M8 Aller Bolt-65mm
01
of the solar module frame to form secure electrical bounds,
Luck Washer -
01
which are repeated throughout the array. Dual Rack
Grounding Clamp has proven robust in grounding 60-cell
and 72-cell Type 1 solar module frames.
Comparing with traditional solar module grounding method,
Dual Rack integrated:grounding system, including grounding
mid clamp and grounding, bounding, splicing three -ill -one
stainless lug (GBS-P6, UL467); eliminates separate module
grounding hardware, and it creates many parallel grounding
paths throughout the array, providing greater safety for
system owners, also saves installation time. and hardware cost.
ADVANTAGES
• Compatible with Dual Rack PV mounting system
• Electrically bond. the solar modules together
4 Conforms to UL STD 2703 and Class A Fire Rated
En. CLASSIMED
% -S
Intertek
5000799
:Co fo to UL,SUa 27=
EOrdering Specific
Package Small Box Big Box
Standard Packaging lope 80pc 320pc
Weight 1.67.lbs 13.36lbs 53.44lbs
Liistallation Guide. � , _ ,
For detailed instructions please refer to theDual Rack installation guide
General Notes
RACKING
SPECS
Drawn By: David D.
No.
Revision/lasue
Date
CONTRACTOR
r;Ro see.. A*—
Highlight Solar Inc.
Address:
1624 Remuda Lane,
San Jose,
CA 95112
Phone Number:
(866) 926-9997
Lic# 960376
X
� Might Solar
Michael McMillian
10225 Carmen Rd,
Cupertino, CA 95014
ad.
April 12, 2016
1h d
10
sod.
AS INDICATED
nN�d
PV SYSTEM
1
ack aW
' A_L _!_L0ELLi..(-t11tn ii
-, -
PART NO. - DR-BFLK01DUALBACK
DR-BFLK-01 5/16'x4"SS Lag Belt FLASH L-KIT
3/8" SS Washer PRODUCT .LINE 4
Heald DON.BaseItem 9 - Product Name
i r DR-CFLK-D 1 1jua1Rack:Flash L-kit Clear (12:0 IX 12.0-) Pell
. f j
- EPDM Washer, i DR-CFLK-02 DualRack Flash L Krt Clear (9 0" x 12 5)
DR BFLK-01 DualRack ..Flash L Kit Black 12.0 12 0 i
Alurninum'Flashiha, p f3uildl1gq
��DR-FLK2 DualRacklasL Black 25)(
H
NIATERU1. SPECIFICATIONS
#.: Matanal Designation 6005 TS
168 5G Ib1fP 2 7 /cm �. 1. ' V !v r F _ r— _
�. � • .:-�, �' Den. (o) w. _.: ,:. � -�g-� )
F Coefticrent of Thermal expansion (or} 1 308E-051°F(2 35E 05J C) _l l ic
Drf_fusiv_rty (1,) ____ _ - 200 00 VJIm K ' - ., d . .
- -. _ _ _
t,• U.)%.'r.:�
- L,..
a Modulus of Elasticdy (E) • 10 152EOG Ps! (7,000 kNlcgi') _-
Shear. Modulus (G) " 3 916E06 Psr 700 kN1an r P -
_ — r. j ..-: . �U. ._..y) INSTAL�BTION< GUIDE
ECHANICAL
L. DUAL RAM,:
Tensile -Strength (f ) ,.,. 38 0 Ksi (260 kNlcm,) �..... :, ,a::; ';.i` °`nn'.a _ s` s r*.`,^-. t',, w ,.,�„,-,s•'"...:..s^
- .. _. py
. -
TensileY�eld Strength (frr) 350 Ksi-(240kN/cam) .. �`•'`-,``~�-'' a.'`• s: �,' ' ',. .;•a; '`� -- ':-a �„i".:: ��,s;,'fa'Si.�,�.tL^7
FLASH L KIT_t
:. _-. _ - -< ate; t iR;. E
W `'7 4d'"# .f' ".�.. et'' "% --.st ✓ Po.'A4'`.^" C :' F
Profile WaII�Tluclmess (t 50 3i inJ10 mtn);.' ...._ ,, g•,
Our Dual Rack Flash L-Kit comes in 12.0' x 12.0' and* gq `
CDB�IPOI�ENT LIST4VI�ARRANT�' ` x
__.
9.0 x 12.5 sizes and Is designed to be used an
MATERIAL 0n 10 Yeer hmrteo warrant}+_,-. _ _, }� -
composition/asphalt shingle roofs. Our roof flashing Aummum Fleshing�
HsAVv1.,Dtnr � Base o _
slides quickly into place with no need to modify the 3ra x ; 5 s s Hex Boll C 1. 2. 3. 4.
- Locate, choose, and mark centers of Gently break seal between shingles Put 5116"x4" lag bolt through L-foot. Secure EPDM washer onto bolt.
R 3B ,S S Wa her D rafters to be mounted. Select the and.remove any nails. Slide mount Next slide the EPDM washer up onto Attach bolt and flashing to rooftop.
shin le to force a fit. Just a simple, waterti ht seal ever -' _ =
9 p g y 3i8 Flnnce Nut o, _ courses of shingles where mounts up under shingles, with flashing the lag bolt:
5+16'x< b S Ln' Boo 01 will be placed. lined up with rafter center. Mark
time. All stainless steel hardware Included for fast, --- - center for dri ling.
• EFDMWasher p01-
single bolt installation. 10-year limited product warranty:-- .��-:-- •�--,.,: ,,. -N
�RDERING:SPECIFICS _.���_ ,�_.�. •- .• � .����,: ��, � ����. �r ��
y ProdurS DR-CFLK-01/DR-BFLK�II7 DR�FLK-02,/DR BFLK02 ,k `1"'�.,"�., �.;
Net Werght 0 90 Iru i ael 1 151bs l set i -
ADVANTAGES
i Standard Pack S sat! box S set /.box e; � �'';��
Slenderd Peck Dtmaneion x 14 0' (L).x 13 q' MO x:3:5
a
✓ Fast, simple one bolt Installation = ( )
Standard P¢ck Weig�hl 5 45 bst I box ,r _ fi251bs I box; - .. ; r.s�
✓ Stainless steel hardware (included)
5�. n n - - B,g Pack,_-; 4 small box! brg,pack (20 sell box) _ 4 smell hoz l big pads (20 set! box) 1 Using the rack kit hardware, secure
6. 7 8.
All -aluminum 9.0 x 1,2.5 & 12.0 x 12.0� flashing - :. s - 9 You are now ready to attach the Attach the rail to the 1_ foot using Take care not to warp or damage
' Biy Padc Dimelsi 14 0 (L) x 13 0. (W) x 14 0 (H) _ 14 0 (L) x 130 (IRS x 14 0' (H) the racking (1-foot) to the -mount. rack. SI'ideahe 3J8' bolt through 3J8" holf's and hut: the roof panel when tightening the nut.
_ _
✓ 10-year warranty; 25-year expected`llfe FBig Rack We,gM _ . _ . 5 lbs l bmc -- __, _,_ _ . 25.5.6s l baz.� . _ ..._ _. ___ _. _ the rail groove.
.Meets or exceeds roofing industry best practices
✓ 100% IBC compliant
No Shingle cutting C®�11TACT INFO'� � r DISTRIBUTOR'' INFO
(»�
Dual Rack:lnc.
t ackm .241 N 10th Street, Unit 4
Sacramento CA 95911.
info@DualRaCk:net w:WWDualRack et.
General Notes
ATTACHMENT
DATA SHEET
Drawn By: David D.
No.
Revision/leeue
Date
CONTRACTOR
Highlight Solar Inc.
Address:
1624 Remuda Lane,
San Jose,
CA 95112
Phone Number:
(866) 926-9997
Lic# 960376
f
�f Highlight Sear
rw}d rr.,. • •ram
Michael McMillion
10225 Carmen Rd,
Cupertino, CA 95014
ad,
April 12, 2016
®..
sod.
AS INDICATED
wul.d
PV SYSTEM
SMOKE / CARBON MONOXIDE ALARMS
OWNER CERTIFICATE OF COMPLIANCE
COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION
+ .'V PERT(NQ 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3228 • FAX (408) 777-3333 • building(cDcupertino.org
_ )r'er`y
Address 0"Z: CAJZJI7'
T n=
PURPOSE
This affidavit is a self -certification for the installation of all required Smoke and Carbon Monoxide Alarms for
compliance with 2013 CRC Section R314, 2013 CBC Sections 420.6 and 907.2.11.2 where no interior access for
inspections are required.
GENERAL INFORMATION
Existing single-family and multi -family dwellings shall be provided with Smoke Alarms and Carbon
Monoxide alarms. When the valuation of additions, alterations, or repairs to existing dwelling units exceeds
$1000.00, CRC Section R314 and CBC Sections 907.2.11.5 and 420.6 require that Smoke Alarms and/or Carbon
Monoxide Alarms be installed in the following locations:
AREA
SMOKE ALARM
CO ALARM
Outside of each separate sleeping area in the immediate vicinity of the
bedroom(s)
X
X
On every level of a dwelling unit including,basements
X
X
Within each leeping room
X
Carbon Monoxide alarms are not required in dwellings which do not contain fuel -burning appliances and that
do not have an attached garage. Carbon monoxide alarms combined with smoke alarms shall comply with
CBC Section 420.6 and shall be approved by the Office of the State Fire Marshal.
Power Supply: In dwelling units with no commercial power supply, alarm(s) may be solely battery operated.
In existing dwelling units, alarms are permitted to be solely battery operated where repairs or alterations do
not result in the removal of wall and ceiling finishes or there is no access by means of attic, basement or crawl
space. Refer to CRC Section R314 and CBC Sections 907.2.11.4.and 420.6.2. An electrical permit is required for
alarms which must be connected to the building wiring.
As owner of the above -referenced property, I hereby certify that the alarm(s) referenced above has/have been
installed in accordance with the manufacturer's instructions and in compliance with the California Building
and Califonnda Residential Codes. The alarms have been tested and are operational, as of the date signed -
below.
I haves raarl and anraa to rmmnli"lifh tha4arn cl rnnn9finne of thic emfomnnf
owne�o�=`(lwnet figent's);Name ---
Mi g� ire-M11.0
Si rizdl e.i............... ..............:...........................................
nafu€e...a.......... Lrc #.................................... {.Dafe: ...............
Smoke and CO form.doc revised 03118114
WATER -CONSERVING PLUMBING FIXTURES
OWNER CERTIFICATE OF COMPLIANCE
COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING .DIVISION
CUPE6tTiNO 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3228 • FAX (408) 777-3333 buildingft-cupertino.org.
L wner ame; m i C.1k L i L3 � t Rio
Is your real property a registered historical site?
0 Yeses Civil Code Sections 1101.1 through 1101.8 do not apply. Skip the rest of the form and sign bottom of form.
No Go to Question 2.
Does your real property have a licensed plumber certifying that, due to the age or configuration of the property or its
plumbing, installation of water -conserving plumbing fixtures is not technically feasible?
El Yes Civil Code Sections 1101.1 through 1101.8 do not apply.
0 The licensed plumber's certification has been provided to the Building Division.
Skip the rest of the form and sign bottom of form.
,;K-No Go to Question 3.
'3� Is water service permanently disconnected for your building?
O Yes Civil Code Sections 1101.1 through 1101.8 do not apply. Skip the rest of the; form and sign bottom of form.
No Go to Question 4.
Is your real property built and available for use or occupancy on or before January 1, 1994?
0 No My real property is built and available for use or occupancy after January 1, 1994.
Civil Code Sections 1101.1 through 1101.8 do not apply. Skip the rest of the form; and sign bottom of form.
A. Yes My real property is built and available for use or occupancy on or before January 1, 1994.
Civil Code Sections 1101.1 through 1101;8 apply. Check one of the three following statements and sign
bottom of form..
�i1 Please check ONE of the following:
My property is a single-family residential real property. See Civil Code Section 1101.4.
On and after January 1, 2014, building alterations or improvements shall require all non -compliant plumbing fixtures
to be replaced with water -conserving plumbing fixtures throughout the building. On or before January 1, 2017, all non-
compliant plumbing fixtures shall be replaced with water -conserving plumbing fixtures (regardless of whether
property undergoes alterations or improvements).
El My property is a multifamily residential real property. See Civil Code Section 1101.5.
On and after January 1, 2014, specified building alterations or improvements shall require non- compliant
plumbing fixtures to be replaced with water -conserving plumbing fixtures.
On or before January 1, 2019, all non -compliant plumbing fixtures shall be replaced with water -
conserving plumbing fixtures throughout the building (regardless of whether property undergoes alterations or
improvements).
0 My property is a commercial real property. See Civil Code Section 1101.5.
On and after January 1, 2014, specified building alterations or improvements shall require non- compliant
plumbing fixtures to be replaced with water -conserving plumbing fixtures.
On or before January 1, 2019, all non compliant plumbing fixtures shall be replaced with water conserving
plumbing fixtures throughout the building (regardless of whether property undergoes alterations or unprovements).
I, as the owner or owner's agent of this property, certify under penalty of perjury that non -compliant plumbing, fixtures will be
replaced prior to date specified above with water -conserving plumbing fixtures in accordance with Civil Code Sections 1101.1
through 1101.8, the current California Plumbing Code and California Green Building Standards. Code, and manufacturer's
q indicated in the
able onithe rfollowin2 vane. d that the watery-c�onse�plumbing fi .tyres complywith the requirements as m _
Upon completing and signing this Certificate, please return it tolhe $wilding Division in order to final your budding permit.
SB407 2015.doe ,revised 08126115