B-2016-1757CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: CONTRACTOR: PERMIT NO: B-2016-1757
10396 S STELLING RD CUPERTINO, CA 95014-4227 (359 13 124) COMPLETE SOLAR
SOLUTION OF
CALIFORNIA INC
SAN MATEO, CA 94404
I OWNER'S NAME: ROSSI DONALD E TRUSTEE & ET AL I I DATE ISSUED: 04/13/2016
I OWNER'S PHONE: 408-417-0713 I I PHONE NO: (855) 541-6703 I
LICENSED CONTRACTOR'S DECLARATION_
License Class C-10 Lic. #961988
Contractor COMPLETE SOLAR SOLUTION OF CALIFORNIA INC Date
06/30/2017
I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing
with Section 7000) of Division 3 of the Business & Professions Code and that my
license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
1. I have and will maintain a certificate of consent to self -insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
I have and will maintain Worker's Compensation Insurance, as provided for by
Section 3700 of the Labor Code, for the performance of the work for which this
permit is issued.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above
information is correct. I agree to comply with all city and county "ordinances
and state laws relating to'building construction, and hereby authorize
representatives of this city to enter upon the above mentioned property for
inspection purposes. (We) agree to save indemnify and keep harmless the
City of Cupertino against liabilities, judgments, costs, and expenses which
may accrue against said City in consequence of the granting of this permit.
Additionally, the applicant understands and will comply with all non -point
source regulations per the Cupertino Municipal Code, Section 9.18.
•signatures Date 4/13/2016
OWNER -BUILDER DECLARATION
I hereby affirm that I am exempt from the Contractor's License Law for one of the
following two reasons:
1. I, as owner of the property, or my employees with wages as their sole
compensation, will do the work, and the structure is not intended or offered for
sale (Sec.7044, Business & Professions Code)
2. I, as owner of the property, am exclusively contracting with licensed
contractors to construct the project (Sec.7044, Business & Professions Code).
I hereby affirm under penalty of perjury one of the following three declarations:
1. I have and will maintain a Certificate of Consent to self -insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
2. I have and will maintain Worker's Compensation Insurance, as provided for by
Section 3700 of the Labor Code, for the performance of the work for which this
permit is issued.
s. I certify that in the performance of the work for which this permit is issued, I
shall not employ any person in any manner so as to become subject to the
Worker's Compensation laws of California. If, after making this certificate of
exemption, I become subject to the Worker's Compensation provisions of the
Labor Code, I must forthwith comply with such provisions or this permit shall
be deemed revoked.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is
correct. I agree to comply with all city and county ordinances and state laws
relating to building construction, and hereby authorize representatives of this city
to enter upon the above mentioned property for inspection purposes. (We) agree
to save indemnify and keep harmless the City of Cupertino against liabilities,
judgments, costs, and expenses which may accrue against said City in
consequence of the granting of this permit. Additionally, the applicant understands
and will comply with all non -point source regulations per the Cupertino Municipal
Code. Section 9.18.
Signature Date 4/13/2016
BUILDING PERMIT INFO:
X BLDG _ ELECT —PLUMB
_ MECH X RESIDENTIAL _ COMMERCIAL
JOB DESCRIPTION:
INSTALL 26 (N) ROOF MOUNT SOLAR PANELS 7.02 KW
Sq. Ft Floor Area: I Valuation: $35100.00
APN Number: Occupancy Type:
359 13 124 Deferred Submittal (R-3)
PERMIT EXPIRES IF WORK IS NOT STARTED
WITHIN 180 DAYS OF PERMIT ISSUANCE OR
180 DAYS FROM LAST CALLED INSPECTION.
Issued by: Abby Ayende Qum
04/13/2016
RE -ROOFS:
All roofs shall be inspected prior to any roofing material being installed. If a roof is
installed without first obtaining an inspection, I agree to remove all new materials for
inspection.
Signature of Applicant:
Date: 4/13/2016
ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER
HAZARDOUS MATERIALS DISCLOSURE
I have read the hazardous materials requirements under Chapter 6.95 of the
California Health & Safety Code, Sections 25505, 25533, and 25534. I will
maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the
Health & Safety Code, Section 25532(a) should I store or handle hazardous
material. Additionally, should I use equipment or devices which emit hazardous
air contaminants as defined by the Bay Area Air Quality Management District I
will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and
the Health & Safety Code, Sections 25505, 25533, and 25534.
k�ewn'er or authorized agent: _
Date: 4/13/2016
CONSTRUCTION LENDING AGENCY
I hereby affirm that there is a construction lending agency for the performance
of work's for which this permit is issued (Sec. 3097, Civ C.)
Lender's Name
Lender's Address
ARCHITECT'S DECLARATION
I understand my plans shall be used as public records.
Licensed
Professio
CUPERTINO
ALTERNATIVE ENERGY PERMIT APPLICATION Lumm
COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION
10300 TORRE AVENUE - CUPERTINO, CA 95014-3255
(408) 777-3228 • FAX (408) 777-3333 • buildinon.cuperlino.p
PROJECT ADDRESS Q 3 G 6 5 5 4 -e N w QO(
1
I APN R° � Sr�J i , �'��
v
OWNER14AA4E 06 ( A SS
fsla l L�
I PHON`E=Q�,� / 1 u I7_ 6-7I3 E-MAIL
-I -1
STREET ADDRESS 0 3 � S 5•fiz ((�� ��
CITY, STATE, ZIP
I FAX
CONTACT NAME lineni'GI
-`
PHONE � L}'Q�i)/
ENiAII.�Lo�
STREET ADDRESS
CITY, STATE, ZIP t'COALtcta�
FAX
❑ 01;?.=R ❑ Ow,,,�.-R-BULL DER ❑ 011w----R A9,N'T ❑ CONTRACTOR P CONTRACTOR AGENZ• ❑ ARc,=.cT ❑ ENGINEER ❑ DEVELOPER ❑ i_NAT'r
CONTRACTOR NAME GC/�1 t SR
LICENSE N'Uh-ILBER ; /
"I
LICENSE TYPE 16
I BUS. LIC R ��
COMPANY NA1IE
E-MAIL
FAX
STREET ADDRESS
CITY, STATE, ZIP
PHONE
ARCHITECT/`ENGINEER NAhiz
I LICENSE NUMBER
BUS. LIC 1,
C01+4PANY NAME
E-M.AIL
FAX
STREET ADDRESS
I CITY, STATE, ZIP
PHONE
USE OF ❑ SFD or Duplex ❑ Multi -Family
PROJECT IN WILDLAND
PROJECT IN
STRUCTURE: ❑ Commercial
URBAN INTERFACE AREA ❑ Yes ❑ NO
FLOOD ZONE ❑ Yes ❑ NO
U-SOLAR PANELS
I ❑ ELECTRIC VEHICLE CHARGING STATION
❑ SOLAR WATER I'EATING
❑ MiER:
FOR SOLAR FAA'ELS: NUMBER OF PANELS/L'NITS: /
KILOWATTS (COMMERCIAL ONLY):
TOTAL VALUATION:
DESCRIPTION OF WORK
• -
RECEIVED BY.. - � � � r3 --r i .
By my signature below, I certify to each of the following: I am the property m-\mer or authorized agent to act on the property ovme.r's be alf. I ha ,e read this
application and the information I have provided is correct. I have
read the Description of Work and ve.rii, it is accurate. I agree to comply with all applicable local
ordinances and state laws relating to building connstruction. I authorize representatives of Cupertino to enter the above -identified prope, for inspection purposes.
SianatureofApplicant/Agent: �J.a/7 `
Date: 9
SUPPLEMENTAL INFORM.4TI0N REQUIRED
f � t•
.�Y O �E12THE+COUI�'�'ER ` r a
ram:
cT43�DARDN {
�€
PV,4pp_2011.doc revised 0311 b/11
GENERAL NOTES
1. ALL ELECTRICAL MATERIALS SHALL BE NEW AND LISTED BY
RECOGNIZED ELECTRICAL TESTING LABORATORY
CUSTOM MADE EQUIPMENT SHALL HAVE COMPLETEWRATED
I
SUBMITTED BY THE MANUFACTURER ATTESTING TO
2. OUTDOOR EQUIPMENT SHALL BE AT LEAST NEM
3. ALL METALLIC EQUIPMENT SHALL BE GROUNDED
4. ALL SPECIFIC WIRING IS BASED ON THE USE OF COPPER.
5. CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS PRIOR TO
INSTALLATION AND SHALL COORDINATE ALL INSPECTIONS, TESTING
COMMISSIONING AND ACCEPTANCE WITH THE CLIENT,
UTILITY CO. AND CITY INSPECTORS AS NEEDED.
6. THE ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT
LOCATIONS OF SERVICE POINTS AND SERVICE SIZES WITH THE
SERVING UTILITY COMPANY AND COMPLY WITH ALL UTILITY
COMPANIES REQUIREMENTS. IF THE SOLAR BACK FED BREAKER IS
VOER THE BUSS SIZE 20% LIMIT, CONTRACTOR SHALL INCLUDE THE
COST TO REPLACE MAIN BREAKER OR ENLARGE MAIN CAPACITY.
7. DRAWINGS ARE DIAGRAMMATIC ONLY, ROUTING OF RACEWAYS
SHALL BE OPTION OF THE CONTRACTOR UNLESS OTHERWISE
NOTED AND SHALL BE COORDINATED WITH OTHER TRADES.
8. IF THE ROOF MATERIAL OR ROOF STRUCTURE NOT ADEQUATE
FOR PV INSTALLATION, CALL ENGINEER PRIOR TO INSTALL. THE
CONTRACTOR IS RESPONSIBLE TO VERIFY THAT THE ROOF IS
CAPABLE OF WHITSANDING THE EXTRA WEIGHT.
9. IF THE DISTANCES FOR CABLE RUNS ARE DIFFERENT THAN
SHOWN, THE CONTRACTOR SHALL NOTIFY THE ELECTRICAL
ENGINEER TO VALIDATE THE SIRE SIZE. FINAL DRAWINGS
WILL BE RED -LINED AND UPDATED AS APPRPRIATE.
10. WHENEVER A DISCREPANCY IN QUALITY OF EQUIPMENT ARISES ON THE
DRAWING OR SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE
FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICES REQUIRED
BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN THE
SPECIFICATIONS TO ENSURE COMPLETE COMPLIANCE AND LONGEVITY OF
THE OPERABLE SYSTEM REQUIRED BY THE ARCHITECT/ENGINEERS.
11. ALL BROCHURES, OPERATION MANUALS, CATALOGS, SHOP
DRAWINGS, ETC. SHALL BE HANDED OVER TO OWNER'S,
REPRESENTATIVE AT THE COMPLETION OF WORK
PHOTOVOLTAIC NOTES:
DATE
1. ROOFTOP MOUNTED PHOTOVOLTAIC PANELS AND MODULES
SHALL BE TESTED, LISTED AND IDENTIFIED UL 1703.
2. SOLAR SYSTEM SHALL NOT COVER ANY PLUMBING OR MECHANICAL
VENTS
3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED.
4. SOLAR INVERTER MUST HAVE A MANUFACTURE
INSTALLED DISCONNECTING MEANS THAT PREVENTS
PARALLEL FEEDING UTILITY LINES DURING POWER OUTAGE.
5. REMOVAL OF AN INTERACTIVE INVERTER OR OTHER EQUIPMENT
SHALL NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE
GROUNDING ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC
SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTORS.
6. ALL PV MODULES AND ASSOCIATED EQUIPMENT AND
WIRING SHALL BE PROTECTED FROM ANY PHYSICAL
PM %QV
IVE PARTS OF PV SOURCE CIRCUITS AND PV OUTPUT
IRCUITS OVER 150V TO GROUND SHALL NOT BE
ACCESSIBLE TO OTHER THAN QUALIFIED PERSONS WHILE
ENERGIZED.
8. INVERTER IS EQUIPED W/ INTEGRATED GFDI, THUS
PROVIDING GROUND FAULT PROTECTION
9. ALL CONDUCTORS SHALL BE COPPER AND 90 DEG RATED
10. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY A
RECOGNIZED ELECTRICAL TESTING LABORATORY OR
APPROVED BY THE DEPARTMENT.
11. CONDUITS SHOULD BE PAINTED TO MATCH EXISTING
ROOF AND WALL COLORS
12. ALL WORK SHALL BE IN ACCORD WITH THE 2013 CBC, 2013
CEC AND 2011 NEC WITH SPECIAL ENPHASIS ON ARTICLE 690
13. THE OUTPUT OF A UTILITY INTERACTIVE -INVERTER SHALL
BE PERMITTED TO BE CONNECTED TO THE SUPPLY SIDE OF
THE SERVICE DISCONNECTING
MEANS AS PER 230.82(6)
14. A SINGLE CONDUCTOR SHALL BE PERMITTED TO BE USED
TO PERFORM THE MULTIPLE FUNCTIONS OF DC GROUNDING,
AC GROUNDING
AND BONDING BETWEEN AC AND DC SYSTEMS AS PER NEC
690.47(C) AND SIZED AS PER SEC; 250.122
15. EQUIPMENT GROUND CONDUCTOR REQUIRED IN
RACEWAYS SIZED PER CEC 250-122.
16. PER ART 250.92. NON -CURRENT CARRYING METAL PARTS
OF EQUIPMENT SHALL BE EFFECTIVELY BONDED TOGETHER.
BOND BOTH ENDS OF RACEWAYS
pLq�
� p �l�NG DEPT
RTINO
SHEET INDEX
1
ROOF PLAN
2
SINGLE LINE DIAGRAM
3
CODE REQUIRED SIGNAGE
4
SITE PLAN
5
ATTACHMENT LAYOUT
6
INVERTER MAP
7
MODULE MAP
8
INVERTER DATA SHEET
9
MODULE DATA SHEET
10
MODULE CERTIFICATION
11
RACKING DATA SHEET
12
RACKING SPECS
13
RACKING CERTIFICATVM"'t
INSTALLER
Complete Solar
Address:
1850 Gateway Dr., Suite 450,
Foster City, CA 94404
Phone Number:
(877) 299-4943
Lic# 961988
Class C-10
om IeteSolar
DESIGNER NAME:
DA VI D D.
DATfOEPARTMENT
11- MARCM4016
� rrwvw
14 ATTACHMENT DATA SH F Td s ecifications MUST be kept at the
on. It is unlawful to make any
THE INSTALLATION OF SOLAR ARRAYS AND PHOTOVOLTAIC' wiate
POWER SYSTEMS SHALL COMPLY WITH THE FOLLOWiNGCODES9Official-
2013 CALIFORNIA ELECTRICAL CODE ,f this plan and specifications SHALL NOT
2013 CALIFORNIA RESIDENTIAL CODE rmit or to bean approval of the violation
2013 CALIFORNIA BUILDING CODE pr,"I^i^ns of any City Ordinance or tate Law.
2013 CALIFORNIA GREEN BUILDING STANDARDS CODE Onk , l i.�. _ n _
2013 CALIFORNIA ENERGY CODE
2013 CALIFORNIA MECHANICAL CODE
2013 CALIFORNIA PLUMBING CODE '20c0
ALL OTHER ORDINANCE ADOPTED BY THE
LOCAL GOVERNING AGENCIES
BY PROJECT NAME: Donald Rossi
10396 S Stelling Rd, Cupertino, CA 95014
Y 103969 DbAWd
VICINITY MAP
SCALE.NTS
SATELLITE VIEW
SCALE:NTS
PHOTOVOLTAIC.SYSffii,4619 IARY
? , � aullding 0epertmen
SYSTEM SIZE: DC STC: 7.02 KW
SYSTEM SIZE: AC CEC 6.18 KW, 3 2016
SOLAR MODULES: (26) SUNEDISON F270KzDDL17A0NVF
MICROINVERTE,RS:( 6) M215-60-2LL S2;I�
MOUNTING �Y§YEA EVEREST MO:�YSTEM
ELECTRICAL INFO610ION:
MAIN SERVICE PANEL BUS SIZE: 200A
MAIN SERVICE BREAKER SIZE: 100A
BUILDING INFORMATION:
TWO STORY HOUSE
CONSTRUCTION TYPE: V-B
OCCUPANCY: R-'fj
ROOF: S CONCRETE TILE
TRUSSES: 2"X6" @ 24" O.C.
PHOTOVOLTAIC ARRAY
(26) SunEdison 270 W Solar Modules (SE F270KzD-3y)
(26) Enphase Energy (M215-60-2LL-S22-IG)
UNIT INDEX
MSP
(E) 200A Main Service Panel
PV
(N) PV Load Center
J/B
(N) Junction Box
Cl
M215 Micro Inverter
Solar Module
EMT Type Conduit
OSuneye
reading
South Side view
11-0
(E)Timer Box
(E)Main
Service Panel
Gas
B.O.S. LOCATION MAP
min 10"t-
0
4--min 3'
(N)PV
Load Center
Window
W
FROM JUNCTION BOX TO ROOF EAVE EMT TYPE CONDUIT WILL RUN OVER
THE ROOF AT 1 1/2" HEIGHT, THEN UNDER THE EAVE TO PV EQUIPMENT
Solar Array 2
14 SunEdison 270W
14 M215 Micro -Inverters
Pitch: 18 Deg
CaUPERT INC)
&uilding 1)6P8ttrr`t%r't
REVIEWED FOR CODE CUIViP,
Reviewed By. =�
N
0°
W E
270° 90°
S
180°
SCALE
0 1 5 loft
General Notes
ROOF PLAN
Drawn By : David D.
No. Revision/Issue Date
CONTRACTOR
Complete Solar
Address:
1850 Gateway Dr., Suite 450,
Foster City,
CA 94404
Phone Number:
(877) 299-4943
Lic# 961988
I$ kL
om IeteSolar
Re}ot N— a A* —
Donald Rossi
10396 S Stelling Rd
Cupertino, CA 95014
Deb ae.w
Mar 17, 2016
AS INDICATED
PV SYSTEM
NOTE
A continuity of equipment grounding shall be provided with a minimum of #6 A WG copper grounding All the photovoltaic systems wires that on the roof and UTILITY
conductor between rail interconnection, and rail end connection side of the building shall be protected against physical damage
M
0
#6 AWG EGC
COPPER WIRE
AC.1
100A CENTER
B CIRCUIT a _ INSTALL (1) 20A PV 2-POLE C/B FEED MAIN C/B
PV ARRAY 1 \ J BOX# 1 AC.2 INSTALL (1) 15A PV 2-POLE C/B INSTALL V)
12 SUNEDISON _❑+ -❑+ -❑+ �%I 6E BY 6R
30A CB(PV)
270 WATT MODULES, AC.4 AT OPPOSITE END
12 ENPHASE M215 I 314" EMT AC.3 OF BUS FROM
MICROINVERTERS . . . . . . CONDUIT MAIN FEEDER CB
30 FEET 15A
B CIRCUIT b _ 20A
PV ARRAY 2
' --J BOX# 2 F"
14 SUNEDISON NEMA3R
270 WATT MODULES, -❑+ -❑+ -❑+ �/ 6 BY6
14 ENPHASE M215 PV ONLY LOAD CENTER 314" EMT
MICROINVERTERS """"
EMT 125A , 120/240V CONDUIT NEMA 3R CONDUIT
5 FEET
10 FEET
PV ARRAY INFORMATION
[ ACA ] FROM PV MODULES TO J-BOX
(3) ENPHASE TRUNK CABLE # 12 AWG, PV WIRE + (1) #6 AWG BARE CU EGC
26 SUNEDISON 270WATT SOLAR MODULES
FREE IN THE AIR
MODEL # SE F270KzD-3y
26 ENPHASE ENERGY MICROINVERTERS
[ AC.2 ] FROM J-BOX1 TO J-BOX2
MODEL # M215-60-2LL-S22-IG
(3) #10 AWG THWN-2 + (1) #8 AWG CU EGC,
3/4" EMT TYPE CONDUIT, 30 FEET
NUMBER OF BRANCH CIRCUITS: 2
NUMBER OF MODULES IN BRANCH CIRCUIT a : 12
NUMBER OF MODULES IN BRANCH CIRCUIT b . 14
[ AC.3 ] FROM J-BOX2 TO PV LOAD CENTER
(6) # 10 AWG THWN-2 + (1) #8 AWG CU EGC, 3/4" EMT TYPE CONDUIT, 10 FEET
# OF MICROINVERTERS IN BRANCH CIRCUIT 2: 12
PV MODULE RATINGS # STC
EACH INVERTER OUTPUT MAX CURRENT: 0.9 A
BRANCH CIRCUIT CURRENT: 12 " 0.9'1.25 = 13.5 A
SHORT CIRCUIT CURRENT I -SC = 9.30A
BREAKER SIZE PER B. CRCT - 15A
MAXIMUM POWER CURRENT I -MP = 8.94A
OPEN CIRCUIT VOLTAGE V-OC = 37.8V
# OF MICROINVERTERS IN BRANCH CIRCUIT b : 14
MAXIMUM POWER VOLTAGE V-MP = 30.2V
EACH INVERTER OUTPUT MAX CURRENT: 0.9 A
BRANCH CIRCUIT CURRENT: 14 * 0.9 `1.25 = 15.8 A
BREAKER SIZE PER B. CRCT - 20A
INVERTER RATING
MAXIMUM CONTINUOUS CURRENT: 15.8 A
PEAK PWR TRACKING VOLTAGE = 27-39 V
RACEWAY HEIGHT FROM ROOF 1 2" (TEMP - 39 + 22 = 61 C)
CEC EFFICIENCY = 96.5 /o
TEMP. DERATE FACTOR - 15.8 A / 0.58 = 27.2 A
ENCLOSURE: NEMA6
MORE THAN 3 CCC ADJST. FACTOR (6 WIRES) - 0.8
MAXIMUM INPUT CURRENT = 10 A
ADJUSTED CONDUCTOR AMPACITY - 27.2 / 0.8 = 34.1 A
MAXIMUM OUTPUT CURRENT = 0.9 A
MAXIMUM INPUT POWER = 210 - 300 W
WIRE SIZE FROM NEC TABLE 310.15(b)16 - 10 AWG
MAXIMUM OUTPUT POWER = 215 W
AMBIENT TEM FACTOR 0.58 PER NEC 310.15(b)(2)(a)
IN
U)
D
m
Q
CD
C)
N
EXISTING
200A MAIN
SERVICE PANEL
120/240V
1P,3W, 3AWG
EXISTING BUILDING
GROUND SYSTEM
TO CW PIPE AND'UFER'
Connection to the Interior metal water piping
shall be made within 5 feet from the point of
entrance. 250.68(C) (1)
[ ACA ] FROM PV LOAD CENTER TO MAIN SERVICE PANEL
(3) # 10 AWG THWN-2 + (1) #8 AWG CU EGC
3/4" EMT TYPE CONDUIT, 5 FEET „ C U PR
BuildIng De,,
BRANCH CIRCUITS: 2'�'
F�
TOTAL AMPS FROM 2 BRANCH CIRC : 26 * 0.9A = 23,4A;t'.
CONSIDER CONTINUOUS: 23.4 A * 1.25 = 29.3 A = s>, �`'' ASP J
TEMP. DERATE FACTOR - 29.3 A / 0.91 = 32.2 A REVIEWED FOR CODE
WIRE SIZE FROM NEC TABLE 310.15(b)16 - 10 AWG
AMBIENT TEM FACTOR 0.91 PER NEC 310.15(b)(2)(a) Reviewed By:
MAIN PANEL RATING OUTPUT CALCULATIONS
PV SYSTEM MAX DC OUTPUT:
EXISTING SPLIT PHASE: 3W, 120/240V 26 " 270W = 702OW
BUSBAR RATING = 200A PV SYSTEM MAX AC OUTPUT:
MAIN SERVICE BREAKER = 100A CENTER FEED (26) SUNEDISON F270KzD-3y
100% RULE: (26) M215-60-2LL-S22-IG
MAX ALLOWED FEED: 200A Pmax (PTC Rating) PER MODULE: 246.6W
ACTUAL FEED: 246.6W' 26 = 6.41 KW
100 "MSP" + 30 A "SOLAR" = 130 A - 200A MAX 6.41 KW ` 96.5% CEC INVERTER = 6.18KW
General Notse
SINGLE LINE
DIAGRAM
Drawn By : David D.
No.
Revision/Issue
Date
CONTRACTOR
Complete Solar
Address:
1850 Gateway Dr., Suite 450,
Foster City,
CA 94404
Phone Number:
(877)299-4943
Lic# 961988
4 kL
om IeteSolar
IIAPLIANCE
Donald Rossi
10396 S Stelling Rd
Cupertino, CA 95014
sot.
Mar 17, 2016
>r
soon
AS INDICATED2
PV SYSTEM
S
O
0
0
(STICKER TO BE LOCATED ON
CONDUIT WITH DC CURRENT
EVERY 4' HORIZONTALLY OR
10' VERTICALLY AND 1' FROM
EACH SIDE OF A BEND)
(TO BE LOCATED ON
SUB -PANEL ONLY
WHEN SUB -PANEL IS
DEDICATED FOR PV ONLY)
O AC DISCONNECT
AC PHOTOVOLTAIC POWER SOURCE
RATED AC OUTPUT CURRENT: 23.4 A MAX
NOMINAL AC OPERATING VOLTAGE: 240 Vac
DC DISCONNECT
DC PHOTOVOLTAIC POWER SOURCE O
RATED MAX POWER POINT CURRENT- 8.94 AMPS
RATED MAX POWER POINT VOLTAGE- 30.2 VOLTS
MAXIMUM SYSTEM VOLTAGE- 44.2 VOLTS
SHORT CIRCUIT CURRENT- 9.30 AMPS
WARNING!
ELECTRIC SHOCK HAZARD.
DO NOT TOUCH THE TERMINALS.
TERMINALS ON BOTH THE LINE AND
LOAD SIDES MAY BE ENERGIZED IN
THE OPEN POSITION.
(STICKER LOCATED
INSIDE PANEL
NEXT TO SOLAR BREAKER)
(STICKER LOCATED
INSIDE PANEL
BELOW PV BREAKER)
(STICKER LOCATED
ON THE PV SUB PANEL)
Permanent directory or plaque providing location of service disconnecting
means and photovoltaic system disconnecting means, if not located at the
same location. (Plaques shall be metal or plastic, with engraved or machine printed
letters, or electro-photo plating, in a contrasting color to the plaque. Plaques shall be
permanently attached to the equipmenq or in the required location using an approved
method that is suitable to withstand the environment to which it is exposed. Plaques
and signage shall meet legibility, defacemet, exposure and adhesion requirements of
Underwriters Laboratories marking and labeling system 969(UL969).
Plaques will have red background & white lettering.
MARKINGS, LABELS AND WIRING SIGNS
A. Purpose: Provide emergency responders with appropriate warning and
guidance with respect to isolating solar electric system.
This can facilitate identifying energized electrical lines that connect solar panels
to the inverter, as these should not be cut when venting for smoke removal
B. Main Service Disconnect.
1. Residential buildings - The marking main be placed within the main service
disconnect. The marking shall be placed
outside cover if the main service disconnect is operable with the service panel
closed.
2. Commercial buildings - Tha marking shall be placed adjacent to the main
service disconnect clearly visible from the location where the level is operated
3. Markings: Verbiage, Format and Type of Material.
a. Verbiage: CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED
b. Format: White lettering on a red background. Minimum 3/8 inches letter
height. All letters shall be capitalized. Anal or similar font, non bold.
c. Material: Reflective, weather resistant material suitable for the environment
(use UL - 969 as standard for weather rating). Durable adhesive materials meet
this requirement.
C.Marking Requirements on DC conduit, raceways, enclosures, cable
assemblies, DC combiners and junction boxes:
1. Markings: Verbiage, Format and Type of Material.
a. Placement : Markings shall be placed every 10 feet on all interior and exterior
DC conduits, raceways, enclosures, and cable assemblies,
at turns, above and for below penetrations, all DC combiners and junction boxes
b. Verbiage: CAUTION: SOLAR CIRCUIT Note: The format and type of material
shall adhere to "V. V-3b, c" of this requirement.
c. Inverters are not required to have caution markings
1.Marking is required on all interior and exterior DC conduit
raceways, enclosures,cable assemblies,and junction boxes,combiner boxes and
disconnects.CFC 605.11.1
23he materials used for marking shall be reflective,weather resistant material
suitable for the environment.
Minimum 3/8 "letter height; all upper case letters Arial or similar font, Red
background with white lettering. CFC 605.11.1.1
3.Marcking shall contain the words: WARNING : PHOTOVOLTAIC POWER
SOURCE. CFC 605.11.1.2
4.Marcking shall be placed adjacent to the main service disconnect in a location
clearly visible from the location where the disconnect is operated CFC 605.11.1.3
CAUTION
POWER TO THIS BUILDING IS ALSO SUPPLIED FROMTHE FOLLOWING SOURCES WITH
PV EQUIPMENT LOCATED AS SHOWN:
INVERTER TYPE: MICR
PERT It
ing Depa tl
P13
R CODE
J By.
CODE REQUIRED
SIGNAGE
I Drawn By : David D. I
I No. I Revteion/looue I Date I
CONTRACTOR
Complete Solar
Address:
1850 Gateway Dr., Suite 450,
Foster City,
CA 94404
Phone Number:
(877)299-4943
Lic# 961988
omPIete SOI(-)r
PLIANCE
Donald Rossi
10396 S Stelling Rd
Cupertino, CA 95014
D >
Mar 17, 2016
S..e
AS INDICATED
ft*d
PV SYSTEM
UNIT INDEX
MSP
(E) 200A Main Service Panel
PV
(N) PV Load Center
O
M215 Micro Inverter
Solar Module
W
Driveway
Driveway
'_r• -3
5'
112'
24'
i
EWE
mmm
MSPI IPV
m
90'
32'
CUPL R-
h
Bui'd;rg Dip
REVIEWED FOR CODE
4viewed By:
W E
270° 90°
s
180°
SCALE
0 5 10 2011
Cenervl Notea
SITE PLAN
Drawn By David D.
No.
Revision/Issue
Date
CONTRACTOR
Complete Solar
Address:
1850 Gateway Dr., Suite 450,
Foster City,
CA 94404
Phone Number:
(877)299-4943
Lic# 961988
,4 kL
,gqm IeteSolar
'Irrient
MPLIANC`
Donald Rossi
10396 S Stelling Rd
Cupertino, CA 95014
Mar 17, 2016
sm.
AS INDICATED
...,,.
PV SYSTEM
FLASH MOUNTING DETAIL
MODULE WEIGHT (Ibs)
41.9
# OF MODULES
26
TOTAL MODULE WEIGHT (Ibs)
1089
RACK WEIGHT (Ibs)
218
MICROINVERTERS WEIGHT (Ibs)
88
TOTAL SYSTEM WEIGHT (Ibs)
# OF STANDOFFS
52
MAX SPAN BETWEEN STANDOFFS (in)
48
LOADING PER STANDOFF (Ibs)
26.8
TOTAL AREA (scift)
468
LOADING (PSF)
2 98
1. Everest Solar Mount Racking System
2. Solar Roof Hook Attachment
3. Racking loading calculations were performed for ASCE 7-10 wind speeds @ 110 mph for B and C exposure categories and ASCE 7-10
Seismic Design Category E.
4. Roof attachment hardware to be mounted to existing structure (2"x6"@24" O.C. Trusses/Rafters) at 48" O.C. rail spans or less.
5. Lag bolts are 5/16" X 3.5" stainless steel with 2.5" minimum embedment into the roof rafters.
6. Roof sheathed with 1/2" plywood and upper surface is faced with felt paper. Finished roof surface is S Concrete Tile.
7. Mounts or/and mounting hardware will be sealed with Tremco Vulkem 116 Polyurethane Sealant or equivalent.
cking
nd Brace
CUr..
auildln
PR
:D FOR
viewed B
General Not"
ATTACHMENT
LAYOUT
Drawn By : David D.
No. Revision/Issue Date
CONTRACTOR
Complete Solar
Address:
1850 Gateway Dr., Suite 450,
Foster City,
CA 94404
Phone Number:
(877) 299-4943
Lic# 961988
4
f,RMpleteSolar
apartrnent
20116
DE COMPLIANCE
R,.. Man.. •s..
Donald Rossi
10396 S Stelling Rd
Cupertino, CA 95014
W. >�
Mar 17, 2016
soave
AS INDICATED 5
nWrat
PV SYSTEM
7.02 KW DC (STC)
26 SUNEDSION
F270KzD-3y
270W MODULES &
ENPHASE ENERGY
M215-60-2LL-S22
MICRO INVERTERS
ENVOY SERIAL #:
f:00,19 -a[•14 "TA 00103
COMMUNICATION LEVEL:
ETHERNET BRIDGE INSTALLED:
NOTES:
au
Revie,�.,r .
General Notes
INVERTER
MAP
Drawn By : David D.
No.
Revision/Issue
Data
CONTRACTOR
Complete Solar
Address:
1850 Gateway Dr., Suite 450,
Foster City,
CA 94404
Phone Number:
(877)299-4943
Lic# 961988
GopR*teScilar
I Department
13 2016
CODE COMPLIANCE
By:
p W— a ,*—
Donald Rossi
10396 S Stellinq Rd
Cupertino, CA 95014
Mar 17, 2016
>�
6
SoaY
AS INDICATED
nq.ut
PV SYSTEM
7.02 KW DC (STC)
26 SUNEDSION
F270KzD-3y
270W MODULES &
ENPHASE ENERGY
M215-60-21-L-S22
MICRO INVERTERS
F- i
REVIEWED FOR CO[
Reviewed By.
General Notes
MODULE
MAP
Drawn By : David D.
No.
Revision/lanue
Date
CONTRACTOR
Complete Solar
Address:
1850 Gateway Dr., Suite 450,
Foster City,
CA 94404
Phone Number:
(877) 299-4943
Lic# 961988
dm IeteSolai
I�
COMPLIANCE
Donald Rossi
10396 S Stellinq Rd
Cupertino, CA 95014
D.W
Mar 17, 2016
m..e
sow.
AS INDICATED
ny..r
PV SYSTEM
1I, Microinverters
Enphase M215
-At
The with integrated ground delivers increased energy harvest and
reduces design and installation complexity with its all -AC approach. With the advanced M215, the DC
circuit is isolated and insulated from ground, so no Ground Electrode Conductor (GEC) is required
for the microinverter. This further simplifies installation, enhances safety, and saves on labor and
materials costs.
The Enphase M215 integrates seamlessly with the Engage Cable, the Envoy Communications
Gateway'', and Enlighten', Enphase's monitoring and analysis software.
PRODUCTIVE
Maximizes energy production
Minimizes impact of shading,
dust, and debris
No single point of system failure
enphaser
E N E R G Y
SIMPLE
No GFC needed for microinverter
No DC design or string calculation
required
Easy installation with Engage
Cable
RELIABLE
More than 1 million hOLIrS of testing
and millions of units shipped
Industry -leading warranty, up to 25
years
Enphase" M215 Microinverter // DATA
INPUT DATA (DC)
Recommended input power (STC)
Maximum input DC voltage
Peak power tracking voltage
Operating range
Min/Max start voltage
Max DC short circuit current
OUTPUT DATA (AC)
Peak output power
Rated (continuous) output power
Nominal output current
Nominal voltage/range
Nominal frequency/range
Extended frequency range"
Power factor
Maximum units per 20 A branch circuit
Maximum output fault current
EFFICIENCY
CEC weighted efficiency, 240 VAC
CEC weighted efficiency, 208 VAC
Peak inverter efficiency
Static MPPT efficiency (weighted, reference EN50530)
Night time power consumption
MECHANICAL DATA
Ambient temperature range
Dimensions (WxHxD)
Weight
Cooling
Enclosure environmental rating
Connector type
M215-60-2LL-S22-IG, M215-60-2LL-S25-IG
190 - 270 W
48 V
27V-39V
16V-48V
22V148V
15A
(5208 VAC
(4240 VAC
225 W
225 W
215 W
215 W
1.03 A (A rms at nominal duration)
0.9 A (A rms at nominal duration)
208 V / 183-229 V
240 V / 211-264 V
60.0 / 57-61 Hz
60.0 / 57-61 Hz
57-62.5 Hz
57-62.5 Hz
>0.95
>0.95
25 (three phase)
17 (single phase)
850 mA rms for 6 cycles
850 rn4 rms for 6 cycles
96.5%
96.5%
96.5%
99.4 %
R..r, mw max
-4U"G 10 +fib"G
171 mm x 173 mm x 30 mm (without mounting bracket)
1.6 kg (3.4 Ibs)
Natural convection - No fans
Outdoor - NEMA 6
M215-60-2LL-S22-IG: MC4
M215-60-2LL-S25-IG: Amphenol H4
FEATURES
Compatibility
Compatible with 60-cell PV modules.
Communication
�°v f
Power line '"3 f+►
Integrated ground
The DC circuit meets the requirements for ungrounded PV irr ys in; °_ suh
NEC 690.35. Equipment ground is provided in the Engage *e-I Ct
additional GEC or ground is required. Ground fault protecti i1(GF1P) is
integrated into the microinverter.tiic
Monitoring
Enlighten Manager and MyEnlighten monitoring options
Compliance
UL1741/IEEE1547, FCC Part 15 Class B, CAN/CSA-C22.2 N(R&VJFWED Ff
0.4-04, and 107.1-01
Frequency ranges can be extended beyond
nominal it required by the utility ReviewE
Q` To learn more about Enphase Microinverter technology,
c us visit enphase.corn
Qa 2015 Enphase Energy. N rights resemed Ad tradenk,,:�s or brands it-, this doannent a e registered by their respective owner.
enphase
E N E R G Y
MKT 00069 Rev 1.J
General Not"
INVERTER
DATA SHEET
Drawn By : David D.
No.
Rwision/Issue
Date
CONTRACTOR
Complete Solar
Address:
1850 Gateway Dr., Suite 450,
Foster City,
CA 94404
Phone Number:
(877) 299-4943
Lic# 961988
4 kL
om IeteSolar
'ERTINQ
°1 Department
13 2016
2 CODE COMPLIANCE
naps w,. • rs�.
Donald Rossi
10396 S Stellinq Rd
Cupertino, CA 95014
our
Mar 17, 2016
s.w
8
soar
AS INDICATED
v,e}a
PV SYSTEM
El
sanedison. corn
(t SunEdisori �SunEdison°
SILVANTIS ADVANTAGE
• 16.8% module efficiency with positive power tolerance
• PID-free: compatible with transformerless and multi-MPPT inverters
• Tariff -free: not subject to U.S. countervailing or antidumping tariffs
• Higher return on investment with more watts -per -module
• Utility -grade manufacturing: ISO 14001, ISO 9001 and 100% EL inspection
QUALITY £r SAFETY
• Industry leading PID test conditions:
• 96 hours, 65 C. 65% relative humidity, -1 kV
• IEC certified by TUV SOD:
• 61730 to ensure electrical safety
e 61215long-term operation in a variety of
climates including snow loading up to 5400 Pa
and hail testing
* 61701 Level 1 salt mist corrosion resistant for
marine regions
• 62716 ammonia testing for agricultural
environments
• Manufactured to AQL 0.4 Level II quality
and tested up to 3x beyond IEC standards
• CSA certified to UL 1703 for 1,000 V systems
in the US and Canada
• MCS certified by BABT for the UK
SP PV CYCLE IXI
atw i
.:.. C E D%
p 1
ROBUST 6 AESTHETIC DESIGN
• Black anodized corrosion resistant aluminum frame
1) White back sheet: SE-F2xxCzD3y
II Black back sheet: SE F2xxKzD-3y
• Low glare anti -reflective coated (ARC) tempered
glass
• Reliability tested beyond international standards
SUNEDISON WARRANTY
• 25 year limited warranty for materials and
workmanship for installations < 250 kWDC
• 25 year linear power warranty at STC:
,I Year 1: s 3.5% of rated power
I, Alter year 1 : :i 0.7% rated power degradation
per year
Additional coverage from
SunEdieon'f Linear Warrenry
1
Standard
Warranty
4 6 6 7 8 8 10 11 n 13 14 15 15 17 It 18 20 21 22 23 24 25
r44,4 rr Wwr-ty cev.4e•
SILVANTIS F-SERIES: 255 W TO 275 W
PHYSICAL PARAMETERS
F-SERIES SOLAR MODULE DIMENSIONS mm [inch]
Dimensions
Module
19
mm x 990 m x 50 mry
Weight
Module Wet hl
10 k
ky
- -
Cell Type
-+ Continuous C7 (C(:7) monoc stalllne
Number of Cells
60
Material --
-�Frame Black Anocrzed Auminum
Irar+ao-'
Tempered ARC Glass Thickness
: 3.2 mm
4PLACES
TS AND PARAMETERS' -
. -e4e eeaA�nrole
rs6 �c�
$KAM
Nominal Operating Cell Temperature (NOCT)
'. 45C ! 2C _ _
--
Temperature Coefficient of Pmax
0.46 i !C
e •
Temperature Coefficient of Voc
-0.34 %!C
,'
Temperature Coefficient of Isc
10.06 WC _
Operating Temperature
-40 C to i 85 C
F
Maximum System Voltage
1000 V (UI FI IFC.)
Limiting Reverse Current
9.20 A
e
Maximum Series Fuse Rating
15 A
> _, ___
Pmax Production Tolerance
0 w to -5 W
Junction Box Rating I_P.67 _
IEC 61730 Application Class A
Module Fire Performance Type 2
Module Fire Resistance Rating Class C _
Packaging Specifications 20 modules pe pallet J J-
620 ^,odules per40' high cube container
Wind and Snow Front Load j Up to 5,400 Pa ere�naaa
1111f
Wind Back Load 2,400 Pa
Reduction of STC efficiency from 1000 W/m2 < 4% Module Dimensions
to 200 Wim2 (Relative) P, 390 i35.0; 3 - 1F,68 165 3_ C 5012,0, D - 3C
i,riARACTFR!4T!C`7 Mourrting Role Spacing
_ I. -- 45C 1-17.41 - 90A 39.11
Model # _ F255 F260 F265 F270 F275 F255 F260 F265 F270 F275 Cable Length
(e.g. F2xxCzD_3y)' CzD CzD C7D CzD C?D KzD KzD KzD KzD KzD •L _ 1,DW 139 41
Rated Maximum 266 20G 266 2%0 Z?6 ti6 260 20 27C 275 *1-Other opronsava,laniaupanrequesr,please mntarryourforal
Pnw'r Pmax (WI sales representative for more information.
Open -Circuit Voltage 37.5 37.6 377 37.8 37.9 37.5 37.6 377 37.8 37.9
Voc (VI
Short -Circuit Current 9 25 930 935 940 945 9 ', S 920, 925 930 935
Isc (A)
Module Efficiency (%) 15.7 15.H 1(j 1 16.4 16,H 15.5 15.8 161 16.4 16.8
Maximum Power Point 29.9 300 30 1 302 303 29.9 30 0 30.1 30 2 30,3
Voltage Vmpp IV)
Maximum Power Point 8.53 867 881 8 94 9011, 8.53 8.(37 8 80 844 908 a
Current Impp (A)
NOCT ELECTRICAL CHARACTERISTICS' 3 5
Model# F255 F260 F265 F270 F275 F255 F260 F265 F270 F275 4
Ie.g.F2xxCzD-3y)' CzD CzD CzD CzD CzD KzD KzD KzD KzD ll o
Rated Maximum 1857 1894 '930 1966 200.3 184' 1877 1e13 "9,:9 'c95
Power Pmax (WI I I2
Open -Circuit voltage 34.7 ' 34.8 :N 8 34 9 34.9 134.6 i 34.7 M 7 _0 13 :0.8
IV CURVES AT MULTIPLE IRRADIANCES [25C]
Io
- IOOC'N
Short -Circuit Current 7 h2 7 55 7 'Al 7.61 TEA 1 7.32 7 3h 7.39 7.41 7 44 0 5 10 15 2c 25 70
Ise (A) mn•e� Ivl »? �q 1 'yr/
Maximum Power Point 27.4 21.5 27.5 27.6 27.6 21.4 27,4 27.b 275 2/.6 ] 47LIIi i
Voltage Vmpp (V) IV CURVES AT MULTIPLE TEMPERATUR 100
Maximum Power Point 6.78 I 6.90 7.02 7.14 7.26 6.73 6.85 6.97 7.09 7.21 -o �` ?
Current Impp (A)
Listed specifications are subject to change without prior notice. 6 ! `
�r
eTemperature coefficients m.ay vary. by , 10%
- csc
MODULE
DATA SHEET
I Drawn By : David D. I
I No. I Revision/lasue I Date I
I CONTRACTOR I
COmDlete Solar
Address:
1850 Gateway Dr., Suite 450,
Foster City,
CA 94404
Phone Number:
(877) 299-4943
Lic# 961988
ft
teSolar
g Department
13 20116
:,,411 electrical data at slandard test conditions iS7Q. I" Wp7r; AM 1. 5, 25 C: ekcaical etwfactenstics may
t%nd E V IE.��D F CODE COMPLIANCE
varyry-
Pmdx f-toduaton Tolerance: factory -measured module performance rs warranted to rneel or exctaed the V 4
.eared pane! Sir: pn:ver rating by D W ro +51N
Ay rndicares connector two. 34 = Bizhnk S418, 38 = Ampheno/ Hclio s H4
z indicates manuf3ctunng location,: M = Malayse, X = Mcxico, K = Korca `
'NOCT elecnicar' characteristic measured under normal operating condition of cells: 800 VV,'nr: 20 C.
AM; 5. 'vend ! M"s o
For more information about SunEdison's Silvantis modules, please visit
www.sunedison.com
Gael Ile. Lld.; a a Ed lCr 1p1n iJ li 1::�ervell t;n _ 1
Ld ,And 11
I In �11,1.i Ir�1 t� �� AI IA .te�• l��d_I 11 ks 11�e r- 1, ii e11 d _ 1. ,. _ . 1�� IAIIIIIve'v of l� _n I.VI_.i.c uwi:;---;
Reviews - ky-
1n 15 zc P. x ... mU
vw.v M
L_v1,1 19 dt T -ct) V,,0:1_4b US �14 D2 .,41UIt,
rrael.r Ib,r ! ti�
Donald Rossi
10396 S Stelling Rd
Cupertino, CA 95014
D..
Mar 17, 2016
sw14
AS INDICATED 9
n.1.a
PV SYSTEM
AWW*
CSA
Group
Certificate of Compliance
Certificate: 2536234
Project: 70014794
Issued to: SunEdison Products Singapore
PTE Ltd
80 Robinson Road #02-00
Singapore, Singapore 068898
Singapore
Master Contract: 521_'7
Date Issued: NoNcinber ?1114
The products listed below are eligible to bear the CSA
Mark shown with adjacent indicators 'C' and 'US' fur
Canada and US or with adjacent indicator 'US' for
US only or without either indicator for Canada only.
® Mary Chen.
Issued by: Mary Chen
C us
PRODUCTS
CLASS 531190 - POWER SUPPLIES - Photovoltaic Modules and Panels - Certified to US
Standards
CLASS 5311 10 -POWER SUPPLIES -Photovoltaic Modules and Panels
Photovoltaic Modules with maximum system voltage of 600 V do or 1000 V do and Fire Class C or with Fire
Performance of Type 2 with the model numbers and electrical ratings as follows:
SE-QXXXWCA-3Y, SE-QXXXWCC-3Y where XXX is the power output from 270 W to 330 W, W=A, B, or
C. and Y=1, 2. 3, 4, 5, 6, 7, 8, and 9
SE-QXXXWMA-3Y, SE-QXXXWMC-3Y where XXX is the power output from 270 W to 330 W, W=A, B, or
C, and Y=1, 2, 3, 4, 5, 6, 7, 8, and 9
SE-QXXXWPA-3Y, SE-QXXXWPC-3Y where XXX is the power output from 270 W to 330 W, W=A, B. or C,
and Y=1, 2, 3, 4, 5, 6, 7, 8, and 9
SE-QXXXWTA-3Y, SE-QXXXWTC-3Y where XXX is the power output from 270 W to 330 W, W=A, B, or
C,and Y=1,2,3,4,5,6,7,8,and 9
SE-QXXXWXA-3Y, SE-QXXXWXC-3Y where XXX is the power output from 270 W to 330 W. W=A, B, or
C. and Y=1, 2, 3, 41.5, 6, 7, 8, and 9
I DQD 507 Re.. 2012-05-22 Page. I In
CSA
CPO
�� A Group
Certificate: 2536234 Master Contract: 252127
Project: 70014794 Date Issued: November 3, 2014
SE-PXXXWPA-3Y, SE-PXXXWPC-3Y, SE-PXXXWPD-3Y, SE-PXXXWPC4Y where XXX is the power
output from 260 W to 320 W (72 cells) W=A, B. or E and Y=1, 2, 3, 4, 5, 61 7, 8, and 9
SE-PXXXWTA-3Y, SE-PXXXWTC-3Y SE-PXXXWTD-3Y , SE-PXXXWTC4Y where XXX is the power
output from 260 W to 320 W (72 cells) W=A, B,or E and Y=1, 2, 3, 4, 5, 6, 7, 8, and 9
SE-PXXXWXA-3Y, SE-PXXXWXC-3Y, SE-PXXXWXD-3Y, SE-PXXXWXC4Y where XXX is the power
output from 260 W to 320 W (72 cells) W=A, B, or E and Y=1, 2, 3, 41 5, 6, 7, 8. and 9
SE-FXXXWCC-3Y, SE-FXXXWCD-3YUSE-RXXXWCC4Y where XXX is the power output from 315 W to
375 W (72 cells) W= B or E, and Y=1, 2, 3, 4, 5, 6, 7, 8, and 9
SE-RXXXWCC-3Y, SE-RXXXWCD-3Y, SE-RXXXWCC4Y where XXX is the power output from 260 W to
305 W (60 cells) W= C, F. G or K. and Y=1, 2, 3, 4, 5, 6, 7, 8, and 9
SE-RX XWMC-3Y, SE-RXXXWMD-3Y, SE-RXXXWMC-4Y where XXX is the power output from 315 W
to 375 W (72 cells) W= B or E and Y=1, 2, 3, 4, 51 6, 7. 8, and 9
SE-RXXXWMC-3Y, SE-RXXXWMD-3Y, SE-RXXXWMC4Y where XXX is the power output from 260 W
to 305 W (60 cells) W= C, F. G or K, and Y=1, 2, 3, 4, 5, 6. 7, 8, and 9
SE-RXXXWPC-3Y, SE-RXXXWPD-3Y, SE-RXXXWPC4Y where XXX is the power output from 315 W to
375 W (72 cells) W= B or E and Y=1, 2, 3, 4. 5, 6, 7, 8, and 9
SE-RXXXWPC-3Y, SE-RXXXWPD-3Y, SE-RXXXWPC4Y where XXX is the power output from 260 W to
305 W (60 cells) W= C, F, G or K, and Y=1, 2, 3, 4, 5, 6, 7, 8, and 9
SE-RXXXWTC-3Y, SE-RXXXWTD-3Y, SE-RXXXWTC4Y where XXX is the power output from 315 W to
375 W (72 cells) W= B or E and Y=1, 2, 3, 4, 5, 6, 7, 8. and 9
SE-RXXXWTC-3Y, SE-RXXXWTD-3Y, SE-RXXXWTC4Y where XXX is the power output from 260 W to
305 W (60 cells) W= C, F, G or K and Y=1, 2, 3, 4, 5, 6, 7, 8, and 9
SE-RXXXWXC 3Y, SE-RXXXWXD-3Y, SE-RXXXWXC4Y where XXX is the power output from 315 W to
375 W (72 cells) W=B or E. and Y=1, 2, 3, 4, 5, 6, 7, S. and 9
SE-RXXXWXC-3Y, SE-RXXXWXD-3Y, SE-RXXXWXC4Y where XXX is the power output from 260 W to
305 W (60 cells) W= C. F. G or K. and Y=1, 2, 3, 4.5, 6, 7, 8, and 9
SE-HXXXWCC-3Y, SE-HXXXWCC4Y where XXX is the power output from 315 W to 375 W (144 cells
W= B, or E. and Y=l, 2, 3, 4, 5, 6, 7, 8, and 9
SE-HXXXWCC-3Y, SE-IDXWCC-4Y where XXX is the power output from 260 W to 305 W (120 cell
W= C,F, G or K. and Y=1.2, 3, 4, 5, 6, 7, 8. and 9 r
SE-BXXXWMC-3Y. SE -I )CKXWMC-4Y where XXX is the power output from 315 W to 375 W (144 cell
W= B. or E. and Y=1, 2, 3, 4, 5, 6, 7, 8, and 9
REVIEWED
Revi
DQD 507 Rev. 2012-0.5-22 Page 4
Cenerul Notes
MODULE
CERTIFICATION
Drawn By: David D.
No.
Rwision/lamse
Date
CONTRACTOR
M_ ems.. A*-.
Complete Solar
Address:
1850 Gateway Dr., Suite 450,
Foster City,
CA 94404
Phone Number:
(877)299-4943
Lic# 961988
om IeteSolar
'ERTINO
Department
13 2016
CODE COMPLIANCE
Donald Rossi
10396 S Stellinq Rd
Cupertino, CA 95014
oea
Mar 17, 2016
a.4
10
sod.
AS INDICATED
vr.}.r
PV SYSTEM
Mounting systems for solar technology
Everest Solar Systems
Mounting Systems Solutions
TABLE OF CONTENTS
NEW
New Tilt Kit for CrossRail [Page 31
Enhanced D Dome System [Page 6]
CrossRail for Pitched Roofs 2
CrossRail Tilt Up Systems 3
CrossRail for Ground Mount 4
XPressRail for Trapezoidal Metal Roofs 5
D Dome for Flat Roofs 6
S Dome for Flat Roofs 7
Innovation, Quality and Service 8
For more information contact: sales@everest-solarsystems.com I Phone: 760-301-5300
Mounting systems for solar technology
CrossRail 48 & CrossRail 80
Material: aluminum
Standard length: 16A" or custom
L-Foot w/ T-Bolt and Flange Nut
vlatena!: aluminun,
Hardware. stainless steel
Rail Connector Set CrossRail 48 & 80
Material: aluminum splice
t Hardware: stainless steel
Module End Clamp Set
Material: aluminum, mil, dark
Hardware: stainless steel
Module Middle Clamp Set
Material: aluminum, mil, cork
Hardware: stainless steel
IBurndy WEEB Lug 8.0 + Hardware
16 Weeb Lug 8.0 Material: tin plated copper
Hardware: stainless steel
0►
t•�
0 12 CROSSRAIL FOR PITCHED ROOFS
CrossRail for Pitched Roof :
German engineering - optimized for the US
UL 2703 / ETL approved integrated bonding
Super fast, simple installation
No drilling, no bonding jumpers
Pre -assembled clamps
Robust bonding rail splices
Low part count
Micro Inverter Mounting Kit
Material: stainless steel
End Cap for CrossRail 48 & 80
Material high strength nylon (PA66)
Omega Wire Management Clip
Material: high density plastic (PP)
Burndy KMC WEEB Clip
Material: stainless steel
Pre -assembled with Mid Clamp
HEYClip SunRunner Cable Clip SS, S6404
Material: stainless steel
REVI
For more information contact: salesoeverest-solarsystems.com I Phone: 760-301-5300
ciuPI-11
Cenerol Not"
RACKING
DATA SHEET
Drawn By: David D.
No.
Revision/laaue
Dab
CONTRACTOR
M.e .,
Complete Solar
Address:
1850 Gateway Dr., Suite 450,
Foster City,
CA 94404
Phone Number:
(877)299-4943
Lic# 961988
4 kL
om IeteSolar
Inu
;rtment
COMPLIANCE
Donald Rossi
10396 S Stelling Rd
Cupertino, CA 95014
D
Mar 17, 2016
a
soa.
AS INDICATED
re}a
PV SYSTEM
Everest Solar Systems Everest Solar Systems
Bonding End Clamp Spec Sheet salusystera Bonding Mid Clamp Spec Sheet
'q 1W
A µ.
:06
Integrated bonding
3 UL 2703 component
y Fast, simple installation
i Rugged design complies with a wide variety of module manufacturer's requirements
Secured in place with MK2 for single -hand installation
High strength, corrosion resistant stainless steel construction
1
z'�
3-f
4
5 -41$W
Dark End Clamn Sets
US00_4000353 End Clamp UL 2703 Set, Black, 30-40mm
1. Allen Bolt, Black
1. Lock Washer
1. Universal End Clamp. Black
1 Clamp Spring
5, MK2 Slot Nut
U500_4000354 End Clamp UL 2703,SS, Black, Set 41-50mm
1. Allen Bolt, Black
2. Luck Washer
3. Universal End Clamp. Black
4. Clamp Spring
S. MK2 Slot Nut
3
4
5 -
Plain End lamn C t<
US00 40003S1 End Clamp UL 2703,SS Set 30AOmm
1. Allen Bolt
2. Lock Washer
3. Universal End Clamp
4. Clamp Spring
5. MK2 Slot Nut
US00 4000352 End Clamp UL 2703,SS Set 41-50mm
1. Allen Bolt
2. Luck Washer
3. Universal End Clamp
4. Clamp Spring
5. MK2 Slot Nut
solar system
Integrated bonding
i UL 2703 component
)o Fast, simple installation
Rugged design complies with a wide variety of module manufacturer's requirements
Secured in place with MK2 for single -hand installation
i� High strength, corrosion resistant stainless steel construction
Dark Mid Clamn Sets
US00_4000349 Mid Clamp UL 2703 Set, Black, 30-40mm
1. Allen Bolt, Black
2. Lock Washer
3. Universal Mid Clamp, Black
4. Clamp Spring
5, MK2 Slot Nut
USDO 4000350 Mid Clamp UL 2703,SS,Black,Set 41-50mm
1. Allen Bolt, Black
2. Lock Washer
3. Universal Mid Clamp, Black
4. Clamp Spring
S. MK2 Slot Nut
01
2
3 -
4
5 -4W
Plain
Mid Clamn Sct f..,.r.,,�
US00_4000347
Mid Clamp UL 2703 S 5 t 30'-40mm>•
1. Allen Bolt
!
2. Lock Washer
3. Universal Mid Clamp,,,k p
4. Clamp Spring
E,
S. MK2 Slot Nut
USOO 4000348
Mid Clamp UL2703,SSRbmAPJED ` C C
1. Allen Bolt
2. Lock Washer
Reviewe
3. Universal Mid Clamp
4. Clamp Spring
5. MK2 Slot Nut
U� voe CSTIB `4 CIFAT voe voE i Ls CST13 � wE"Tf voE
REG.-Nr. E520 RFC N, F52a
CEIAB (rr) Passinriovetior TOV Rheinland VDE Certificate - -
2011-128 (fr) -ISO (de)
9001:2008 2015D428-02
20150428-03
Cenercil Notes
RACKING
SPECS
Drawn By : David D.
No.
Revision/Issue
Date
CONTRACTOR
Complete Solar
Address:
1850 Gateway Dr., Suite 450,
Foster City,
CA 94404
Phone Number:
(877)299-4943
Lic# 961988
%WOlete Siar
partment
it -
DE COMPLIANCE
Donald Rossi
10396 S Stelling Rd
Cupertino, CA 95014
Dee.
Mar 17, 2016
3h d
12
seer
AS INDICATED
no}et
PV SYSTEM
Certificate of
�vitliicate NuniUef 20150311-E467724
Report Reference E467724-2015-01-08
Issue Date 2015 March 11
VL
Issued to: EVEREST SOLAR SYSTEMS
3809 Ocean Ranch Blvd Suite 111
Oceanside, CA 92056
Underwriters
Laboratories
This is to cer7ifp that Mounting Systems for Use with Flat -Plate Photovoltaic
representative samples of Modules and Panels
Everest CrossRail System utilizing CrossRail 48 rail
Have been investigated by UL LLC in accordance with the Standard(s)
indicated on this Certificate.
Standards) far Safety: UL 2703, Mounting Systems, Mounting Devices. Clamping/Retention Devices,
and Ground Lugs for Use with Flat -Plate Photovoltaic Modules and Panels.
Additional Information: See UL On-line Certification Directory at WWW.UL.COM for additional
information.
The Everest CrossRail System achieved a system fire classification `A' when
tested in combination with UL 1703 Listed PV modules with Type 1 and Type 2
module fire performance ratings. The system fire test method was in accordance
with the Standard for Safety for Flat -Plate Photovoltaic Modules and Panels, UL
1703, 3rd Edition, dated November 28, 2014.
Look for the UL Listing Mark on the product
Only those products hearing the UL Listing Mark should he considered as being covered by l Us Listing and Follow -Up
Service. '
The UL Listing Mark generally includes the following elements: the symbol UL in a circle.: © with the. word "LISTED-, a
control number (may be alphanumeric) assigned by UL: and the product category name (product identifier) as indicated in the
appropriate UL Directory.
William R. Carney
Director, North American Certification Programs
UL LLC
Any information and documentation involving UL Mark services are provided on behalf of UL LLC (UL) or any authorized licensee of UL.
Fur yuestitets, please contact a Itk•al UL Castonter Service Representative at http.t/www.ul.condgluhal/etty,/pages/cugwrale/cunlaclus/
CUPE
13U06119
f {
�-.PR '
REVIEWED FOR C
Reviewed B
Ceneml Notes
RACKING
CERTIFICATION
Drawn By: David D.
No.
Revision/Issas
Date
CONTRACTOR
R. e.-aft -
Complete Solar
Address:
1850 Gateway Dr., Suite 450,
Foster City,
CA 94404
Phone Number:
(877) 299-4943
Lic# 961988
om lete Solar
TINO
partm nt
DE COMPLIANCE
t�µ.r n.e • �r..
Donald Rossi
10396 S Stelling Rd
Cupertino, CA 95014
oa.
Mar 17, 2016
9h t
13
9oaM
AS INDICATED
w.i.a
PV SYSTEM
Part #
Box QuantKy
Screw Size
17585
10 Hooks
Not Included
17586
1 Hook
Not Included
17587
10 Hooks & 20 Screws
5/16" x 3"
17588
1 Hook & 2 Screws
516" x 3"
17589
10 Hooks & 20 Screws
#14 x 3"
17618
1 1 Hook & 2 Screws
1 #14 x 3"
Type 304 Stainless Steel
For Side Mount Rails
Letter
Description
Size/Length
A
Mounting Screw Slots
9mm x 18mm
B
Rail Slot Size
10mm x 46mm
C
Length of Roof Hook
179 50mm
D
Bottom End to Top End
165 30mm - 173 50mm
E
Thickness
6mm
122mm
}IjjI=Bmm
TB
Rail Slot Accepts
5116' or 3/8' Bolts
8 70mm
❑ ® ❑
140mm
Use our 014 or 5/16' A
Solar Mounting Screws
54mm I!:-
30mm 25.50mm
�N
88mm
=21mm 38.
8.70mm
Ydiu
11t 1h �
O F► 120mm
E
Revt
95°
5830 Las Positas Road, Livermore, California 94551 1 3948 Airway Drive, Rock Hill, South Carolina 29732
Phone: (844)-671-6045 1 Fax: (800)-689-7975 1 www.solarroofhook.com
solarroofhook.com is a division of Quickscrews International Corp.
AFIVE
GJppLUED HAri EQOQd8 A EMSoaCEG30M% 0H6a
980 41st Street Tel: (510) 420.8190
Oakland, CA 94608 FAX (510) 420-8186
e-mail: info@appmateng.com
September 17, 2015
Mr. Rick Gentry
QUICKSCREWS INTERNATIONAL
5830 Las Positas Road
Livermore, CA 94551
Subject: OS# 17585 —All Tile Roof Hook 90' Laboratory Load Tcstin
Dear Mr. Gentry:
January 23. 2014
To whom this may concern.
SolarRoofHook.com is committed to excellence. All of our parts were tested by a third party test facility for
the following.
1. Uplift test
2. Downward load test
3. Water Proof- QuickBOLT only
AME Research facility had a current engineer license per the State of California in 2012 and 2013.
Terrapin Testing had a current engineer license per the State of California in 2011.
The following is an excerpt from:
CALIFORNIA BOARD FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS
g u i d e to Engineering & Land Surveying for City and County Officials
Page 12 Line 27
27. If the license has expired between the time the engineering documents were
prepared and the time where the local agency's review is performed, do the
documents need to be re -seated by a licensee with a current license? (B&P Code
§§ 6733, 6735, 6735.3, 6735.4)
As long as the license was current at the time the engineering documents
were prepared, the documents do not need to be re -sealed prior to review by
the tocat agency. However. any changes (updates or modifications) to the
documents that are made following the review by the local agency would
have to be prepared by a licensed engineer with a current license and those
changes would have to be signed and sealed.
We trust the information provided will alleviate any request for the test reports submitted to have a stamp
from the current year.
Respectfully,
Rick Gentry
V.P. of Sales & Marketing
5830 Las Positas Rd I Livermore, CA 94551
Phone: (844)-671-60451Fax: (800)-689-7975
www.solatroofhook.com
Mr. Rick Gentry
QUICKSCREWS INTERNATIONAL
5830 Las Positas Road
Livermore, CA 94551
Project Number 11572,t
2. Tensile (Uplift) Load Test
Project Number 115727C A total of three tests were conducted for compressive load capacity on September 14, 2015 using a
United Universal testing machine. Samples were rigidly attached to the testing machine and an uplift
load was applied to the hook. The samples were loaded in tension at a constant rate of axial deformation
of 0.09 in. /min. without shock until failure occurred; displacement at maximum load was recorded.
Based on the above testing, the average maximum uplift load of the All Tile Roof Hook 90' attached to
a 2N4" Douglas Fir rafter using two 5/16"0x3" screws was determined to be 2091 Ibf. Detailed results
are provided in Table II. Test setup and mode of failure are provided in Appendix B, Figure 2.
As requested, Applied Materials & Engineering, Inc. (AME) has completed load -testing the All Tile
Roof Hook 90' (see Appendix A, Figure 1). The purpose of our testing was to evaluate the compressive
tensile (uplift) and shear (parallel to rafter) load capacity of the All Tile Roof Hook 90' attached to a
2"x4" Douglas Fir Rafter using two 5/16"00" screws.
SAMMY DESCRIPTION
Mockup samples were assembled in our laboratory on August 31.2015. Mockup configuration consisted
of ftee 12" long rafters at 4.5"o.c., screwed to 1/2" Structural I plywood. All Tile Roof Hook 90' is
attached through the plywood into a rafter with two fasteners installed at the farthest end.
TEST PROCEDURES & RESULTS
1. Compressive Load Test
A total of three tests were conducted for compressive load capacity on September 11, 2015 using a
United Universal testing machine. Samples were rigidly attached to the testing machine and a
compressive load was applied to the hook. The samples were loaded in compression at a constant rate of
axial deformation of 0.09 in. /min. without shock until the hook was bent and came in contact with the
test board: displacement at maximum load was recorded. Based on the above testing, the average
maximum compression load of the All Tile Roof Hook 901'attached to a 2"x4" Douglas Fir rafter using
two 5/16"Ox3" screws was determined to be 395 lbf. Detailed results are provided in Table I. Test setup
and mode of failure are provided in Appendix B. Figure 1.
The specific gravity and moisture content of the rafter was tested in accordance with ASTM D2395,
Method A (oven -dry). The specific gravity and moisture content were determined to be 0.379 and
10.0%. respectively.
;0
m�
<
a'1
CD
<
m
Page i of 12
Q
o
©
_5 —�1n
The specific gravity and moisture content of the rafter was tested in accordance with ASTM D2395,
Method A (oven -dry). The specific gravity and moisture content were determined to be 0.383 and
11.5%, respectively.
3. Shear (Lateral) Load Test Parallel to Rafter
A total of three tests were conducted for shear load capacity on September 16, 2015 using a United
Universal testing machine. Samples were rigidly attached to the testing machine and a shear load
(parallel to rafter) was applied to the hook. The samples were loaded in shear at a constant rate of axial
deformation of 0.09 in. /min. without shock until failure occurred; displacement at maximum load was
recorded. Based on the above testing, the average maximum shear load (parallel to rafter) of the All Tile
Roof Book 90° attached to a 2"0" Douglas Fir rafter using two 5/16"00" screws was determined to be
487 Ibf. Detailed results are provided in Table III. Test setup and mode of failure are provided in
Appendix B, Figure 3.
The specific gravity and moisture content of the rafter was tested in accordance with ASTM D2395,
Method A (oven -dry). The specific gravity and moisture content were determined to be 0.354 and
10.90/0, respectively.
Respectfully Submitted.
APPLIED MATERIALS & ENGINEERING, INC.
ed IM
4.1ratory
Page 2 of 12
Reviewed By:
FEssto QQOlit---
�N TAJIIi �yc
c� 3558Ami Irian. h.D.. P.E.
„]3Fiflc a
Exp 9
*Sr ClVty o P
4� OF CA`�4
PMbIVE 21 E:4VREEERI,' iZ, li::.
�Nt
ffl t
D N Q
o
o
sv
r
C) �7 7
G
0 0 ccn 0
= ° C° o � 0-
D
3
C)
O f" 7 =l
O< CD
CO N rD A •
^
QJ
CO C A (D
O
{
.i
O
r
ti
Q
A
00 ?
g
n:
r
6
Ci a
_
`°.
z
0
"'
�D
°i
D
n
v
N 3
m
U)
rD
-a
rn m
(".
O4
O
rn z
A`
CDLi
�rT.t9s
s
CUPERTtNO
Address Va
SMOKE / CARBON MONOXIDE ALARMS
OWNER CERTIFICATE OF COMPLIANCE
COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION
10300 TORRE AVENUE CUPERTINO, CA 95014-3255
(408) 777-3228 FAX (408) 777-3333 • buildinq(@cui)errino.org
PERMIT CANNOTBE FINALED AND COMPLETED UNTIL THIS CERTIFICATE
HAS BEEN SIGNED AND RETURNED TO THE BUILDING DIVISION
t
PURPOSE
This affidavit is a self -certification for the installation of all required Smoke and Carbon Monoxide .Alarms for
compliance with 2013 CRC Section R314, 9013 CBC Sections 420.6 and 907.2.11.2 where no interior access for
inspections are required..
GENERAL INFORMATION
Existing single-family and multi -family dwellings shall be provided with Smoke Alarms and Carbon =4
Monoxide alarms. When the valuation of additions, alterations, or repairs to existing dwelling units exceeds
$1000.00, CRC Section R314 and CBC Sections 907.2.115 and 420.6 require that Sinoke Alarms and/or Carbon
Monoxide Alarms be .installed in the following locations;
AREA
SMOKE ALARM
CO ALARM
Outside of each separate sleeping area in the immediate vicinity of the
bedrooms)
X
X
On every level of adwellipg unit including basements
X
X
Within each sleeping room
X
Carbon Monoxide alarms are not required in dwellings which do not contain, fuel -burning appliances and that
do not have an attached garage. Carbon monoxide alarms combined with smoke alarms shall comply with
CBC Section 420.6 and shall be approved by the Office of the State Fire Marshal,
Power Supply. In dwelling units: with no commercial power supply, alarm(s) may be solely battery operated.
In existing dwelling units, alarms are permitted to be solely battery operated where repairs or alterations do
not result in the removal of wall and ceiling finishes or there is no access by means of attic, basement or crawl
space. Refer to CRC Section R314 and CBC Sections 907.2.11A and 420.6.2. An electrical permit is required for
alarms which mustbe connected to the building wiring.
As owner. of the above -referenced property, I hereby certify that the alarm(s) referenced above has/have been
installed in accordance with the manufacturer's instructions and in compliance with the California Building
and California Residential. Codes. The alarms have been tested and are operational, as of the elate signed
below.
Smoke and CO form.doc revised 03118114
WATER -CONSERVING PLUMBING FIXTURES FILE
OWNER CERTIFICATE OF COMPLIANCE �` {
COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION
CUP6RTINC> 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777- 228 a FAX (408) 777-3333 buildingCaicupertino.org
Owner Name o r Permit N o!"I
Address 1 I 3� (,- 57oL r,,-4-" r7
1. Is your real property a registered historical site?
❑ Yes Civil Code Sections 1101.1 through 1101.8 do not apply. Skip the rest of the form and sign bottom of form.
C) 1� No Go to Question 2.
2. Does your real property have a licensed plumber certifying that, due to the age or configuration of the property or its
plumbing, installation of water -conserving plumbing fixtures is not technically feasible?
Yes Civil Code Sections 110 1. 1 through 110 1. 8 do not apply.
El The licensed plumber's certification has been provided to the Building Division.
Skip the rest of the form and sign bottom of form.
j P No Go to Question 3.
3. Is water service permanently disconnected for your building?
El Yes Civil Code Sections 1101.1 through 1101.8 do not apply. Ski the rest of the form and sign bottom of form.
ED �k No Go to Question 4.
4. Is your real property built and available for use or occupancy on or before January 1, 1994?
No My real property is built and available for use or occupancy after January 1, 1994.
Civil Code Sections 1101.1 through 1101.8 do not apply. Skip the rest of the form and sign bottom of form.
Ej ❑ Yes My real property is built and available for use or occupancy on or before January 1, 1994.
Civil Code Sections 1101.1 through 1101.8 apply. Check one of the three following statements and sign
bottom of form..
5. Please check ONE of the following:
My property is a single-family residential real property. See Civil Code Section 1101.4.
On and after January 1, 2014, building alterations or improvements shall require all non -compliant plumbing fixtures
to be replaced with water -conserving plumbing fixtures throughout the building. On or before January 1, 2017, all non-
compliant plumbing fixtures shall be replaced with water -conserving plumbing fixtures (regardless of whether
property undergoes alterations or improvements).
❑ My property is a multifamily residential real property. See Civil Code Section 1101.5.
On and after January 1, 2014, specified building alterations or improvements shall require non- compliant
plumbing fixtures to be replaced with water -conserving plumbing fixtures.
On or before January 1, 2019, all non -compliant plumbing fixtures shall be replaced with water -
conserving plumbing fixtures throughout the building (regardless of whether property undergoes alterations or
improvements).
❑ My property is a commercial real property. See Civil Code Section 1101.5.
On and after January 1, 2014, specified building alterations or improvements shall require non- compliant
plumbing fixtures to be replaced with water -conserving plumbing fixtures.
On or before January 1, 2019, all non -compliant plumbing fixtures shall be replaced with water conserving
plumbing fixtures throughout the building (regardless of whether property undergoes alterations or improvements).
I, as the owner or owner's agent of this property, certify under penalty of perjury that non -compliant plumbing fixtures will be
replaced prior to date specified above with water -conserving plumbing fixtures in accordance with Civil Code Sections 110 1. 1
through 1101.8, the current California Plumbing Code and California Green Building Standards Code, and manufacturer's
installation requirements, and that the water -conserving plumbing fixtures comply with the requirements as indicated in the
table on the following page. _ .-. -
Owner or Owner Agent's Signature; R )"AR V,-\ Date:) -'/ Z::�U L4� I
T Tnnn romnl'etinQ and signing this Ceitificate. please return it to the Building Division in order to final your building permit.