DRC Packet 3-17-2016CITY OF CUPERTINO
AGENDA
Thursday, March 17, 2016
10300 Torre Avenue, City Hall Conference Room C
DESIGN REVIEW COMMITTEE
5:00 PM
ROLL CALL
APPROVAL OF MINUTES
1.Subject: Draft Minutes of January 21, 2016
Recommended Action: Approve or modify Draft Minutes of January 21, 2016
Draft Minutes of January 21, 2016
ORAL COMMUNICATIONS
This portion of the meeting is reserved for persons wishing to address the members on
any matter not on the agenda. Speakers are limited to three (3) minutes. In most cases,
State law will prohibit the council from making any decisions with respect to a matter
not listed on the agenda
REPORTS/UPDATES
PUBLIC HEARING ITEMS
2.Subject: R1 Exception to allow the conversion of one bay of an existing garage
into a media room, and construct a 20'-8" by 10'-5" single-bay garage at the front
of the house, resulting in an 11’ front yard setback where 20’ is required.
Application No(s): EXC-2016-01; Applicant(s): Richard Hartman (Li residence);
Location: 21124 Greenleaf Drive APN# 326-28-097
Recommended Action: Approve application EXC-2016-01 per the Draft Resolution
Staff Report
Draft Resolution
Plan Set
NEW BUSINESS
OLD BUSINESS
ADJOURNMENT
Page 1 CITY OF CUPERTINO
March 17, 2016Design Review Committee AGENDA
In compliance with the Americans with Disabilities Act (ADA), anyone who is planning
to attend the next meeting who is visually or hearing impaired or has any disability that
needs special assistance should call the City Clerk's Office at 408-777-3223, 48 hours
in advance of the meeting to arrange for assistance. Upon request, in advance, by a
person with a disability, meeting agendas and writings distributed for the meeting that
are public records will be made available in the appropriate alternative format. Also
upon request, in advance, an assistive listening device can be made available for use
during the meeting.
Members of the public are entitled to address the members concerning any item that is
described in the notice or agenda for this meeting, before or during consideration of
that item. If you wish to address the members on any other item not on the agenda, you
may do so during the public comment portion of the meeting. Please limit your
comments to three (3) minutes or less.
Page 2 CITY OF CUPERTINO
Design Review Committee
January 21, 2016
Cupertino, CA 95014
(408) 777-3308
ACTION MINUTES OF THE REGULAR MEETING OF
THE DESIGN REVIEW COMMITTEE HELD ON January 21, 2016
ROLL CALL
Committee Members present: Alan Takahashi, Chairperson
Margie Gong, Commissioner
Committee Members absent none
Staff present: Tiffany Brown
Staff absent: None
APPROVAL OF MINUTES:
October 16, 2014
Minutes of the October 16, 2014 Design Review Committee meeting were approved as written
WRITTEN COMMUNICATIONS:
None
POSTPONEMENTS/REMOVAL FROM CALENDAR:
None
ORAL COMMUNICATION:
A resident spoke regarding a recent lunch at Lazy Dog Restaurant. She stated that the lunch went well,
the parking garage was easy to navigate and the food and service were good.
CONSENT CALENDAR:
None
PUBLIC HEARING:
1.Application No.(s): EXC-2015-02
Applicant:David Esajian (Main Street Cupertino)
Location:19439 Stevens Creek Boulevard
Sign Exception to allow exposed neon on a sign for a new coffee shop (Philz) at the Main Street
Cupertino mixed use project
Design Review Committee decision final unless appealed.
Staff Member Brown explained that the application has been referred to the Design Review Committee
because of the neon lighting proposed for the sign. Philz Coffee is located in the interior of the new main
Street Cupertino Mixed Use development. The coffee shop is already open for business. They would like
to add to their 2 existing signs, one facing Vallco Parkway and one facing the Town Square. The sign
facing Vallco Parkway has already been approved (without the neon lighting element) and is
approximately three feet by three feet. The exposed neon outline will only be lit at night and be turned
2 Design Review Committee
January 21, 2016
off when the shop closes for the night at 8pm. The second sign faces Town Square and is a little larger.
They also propose to have neon lighting around the lettering outline and will only have the sign lit at
night up until they close. The Master Sign Program for the development was approved in December
2015. The Sign Program allows for exposed neon on signs as long as the property owner and City
approve it. The property owner has already approved the additions to the signs and is in attendance
today. The City’s Sign Ordinance has specific conditions regarding the allowed illumination levels of
exposed neon. The draft resolution included a condition to ensure compliance with the Ordinance. The
greatest light impact will be during the winter months. A representative from the sign manufacturer has
certified to the property owner that the proposed sign’s illumination is half of what is allowed in the
City‘s Sign Ordinance. Staff supports the application.
Commissioner Gong asked what faces the signs. Staff member Brown stated that the most visible sign is
the one facing Vallco Parkway. The building located about 300 feet away has retail uses on the bottom
and apartments on the upper level and the hotel is about 400 feet away. It was reiterated that the
proposed neon will only be on until 8pm and will not be flashing or in other ways moving.
Chair Takahashi opened the public hearing:
A resident, Lisa Warren, spoke (on behalf of a larger group of residents) saying that they opposed any
exposed neon lighting at Main Street because it is in appropriate. They understood that the original
approval for the site stated that there would be no illuminated signing. She felt that the Sign Program
was never advertised to the public and the current signs are not what the public wants to see. Her
questions and concerns to the property owner have not been addressed or have been glossed over. She
does not feel that an exception is necessary and does not want to set a precedence for other stores to
obtain exception permits for signage. The entire Main Street project has grown out of scope and scale
from what was originally promised.
A resident, Jennifer Griffin spoke to say that she also did not want to see neon signs. In the past, neon
signs were heard by the Planning Commission and she does not like that these decisions are not being
made at that level. She cited other neon signs around the City that are very bright and are on all night.
She felt that back lit signs are more appropriate for the City.
Chair Takahashi closed the public hearing.
The applicant, David Esajian from Ad Art Sign Company, addressed the Committee members. He
wanted to assure the Committee members and the speakers that the exposed neon is very subdued. The
bright flashing neon from historical memory is not the neon that will be used for these signs.
Commissioner Gong asked the property owner if the other tenants were noticed. The property owner,
Dean Isaacs, stated that there are only two other tenants in occupation currently and that they were not
noticed. He said that these two tenants can’t even see the signs from their store. He approved the
addition of the neon element to the existing signs because the lighting is not invasive on such small
signs. She asked the applicant to confirm that that neon colors are the white and yellow as shown in the
exhibits. He confirmed that they are. A representative, for Philz Coffee, David Gray, addressed the
Committee to say that the signs are understated and is a corporate branding request. They like the signs
because they are small and low key. In other locations, the property managers have even asked the
company to increase the size of their signs. They are not interested in going “big and bold” and outshine
the other shops in the development or catch people’s eyes from off the street.
Commissioner Gong felt that the sign was very subtle and unobtrusive, definitely not the flashy signs
from the 70s. She was in support allowing the addition of the neon to the existing signs. She thanked the
audience member for bringing in an exhibit that demonstrated just how small the signs are.
Chair Takahashi reminded the audience that they were meeting tonight to discuss this sign exception
request, not the pros and cons or promises and failures of the entire Main Street project. That said, he
spoke that the signs being proposed were in context and conformity with the Sign Ordinance. He
3 Design Review Committee
January 21, 2016
understood the concerns of the audience regarding neon, but felt that these signs were appropriate to the
situation and their application. He didn’t see a specific reason to deny the sign exception application on
its own merits.
MOTION: Commissioner Gong moved to approve EXC-2015-02 per the draft resolution
APPROVE: Chair Takahashi
ABSENT: none
ABSTAIN: none
VOTE: 2-0-0
OLD BUSINESS:
None
NEW BUSINESS:
None
Respectfully submitted:
/s/Beth Ebben
Beth Ebben
Administrative Clerk
DESIGN REVIEW COMMITTEE STAFF REPORT
Agenda Item No. 2 Agenda Date:March 17, 2016
SUBJECT:
R1 Exception to allow the conversion of one bay of an existing garage into a media room, and
construct a 20'-8" by 10'-5" single-bay garage at the front of the house, resulting in an 11’ front
yard setback where 20’ is required. Application No(s): EXC-2016-01; Applicant(s): Richard
Hartman (Li residence); Location: 21124 Greenleaf Drive APN: 326-28-097
RECOMMENDATION:
Staff recommends that the Design Review Committee approve application EXC-2016-01 per the
draft resolution (Attachment 1)
PROJECT DATA:
General Plan Designation:Residential: Low Density (1-5 units)
Specific Plan/Special Area:n/a
Zoning Designation:R1-10 Single Family Residential
Lot size:6,867 sq.ft.
Existing residence, gross area:2,448 sq.ft.(36% FAR)
Proposed residence, gross area:2,662 sq.ft. (39% FAR)
Required property line setbacks:20’ front; 5’ minimum/15’ combined side;
20’ rear
Proposed property line setbacks: 11’ front; 5’ minimum/15’ combined side
Project Consistency with:
General Plan:Yes
Zoning:No, exception requested for garage
dimensions and front yard setback
Environmental Assessment:Categorically Exempt, CEQA Section 15303,
Class 3 (New construction or conversion of
small structures)
COMMUNITY DEVELOPMENT DEPARTMENT
PLANNING DIVISION
CITY HALL
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3308 • FAX (408) 777-3333
EXC-2016-01 21124 Greenleaf Drive March 17, 2016
Page 2
BACKGROUND:
On July 17, 2008, the Design Review Committee approved Application EXC-2008-13 at 21124
Greenleaf Drive, which allowed a portion of a 910-square-foot single-story addition to encroach
into the required front yard setback. That approval established an 11’ front yard setback, where
20’ is required in the R1-10 Single Family Residential District.
DISCUSSION:
Application request
The application proposes the conversion a portion of an existing two-car garage into
conditioned living space and to add a one-car garage addition at the front of the home. The
project would encroach 9’ into the required 20’ front yard setback resulting in an 11’ setback.
The R1 District requires four onsite parking spaces, two of which must be in an enclosed
structure with clear interior dimensions of 20’ by 20.’ The City’s R1 Ordinance requires
requested encroachments into setbacks and non-conforming parking requirements to be
reviewed and approved by the Design Review Committee with an R1 Exception application.
Staff Review
Planning Division staff support the proposed exception for the following reasons:
1. The lot contains less area (6,867 sq. ft) than required by its zoning designation (10,000
sq.ft.).
2. The triangular-shaped lot with a long, curved front property line is unusual to the
neighborhood, where the typical lot is a conforming, rectangular shape with front yard,
two sides and rear yard.
3. While non-conforming in setback and individual dimensions, the garage proposal of
two separate one-car bays meets the enclosed parking requirement when combined.
Each bay is 20’ deep and 10’5-6” wide.
4. The interior conversion of the existing garage to media room allows reasonable addition
of conditioned living space, while minimizing impacts to adjacent neighbors by
maintaining a one-story home and by observing the existing 11’ setback at the front of
the home established through the 2008 approval.
These findings are incorporated into the draft resolution in Attachment 1.
OTHER DEPARTMENT/AGENCY REVIEW
The City’s Public Works Department reviewed the project and provided a public works
confirmation form outlining standard conditions of approval, included in the draft resolution.
No additional conditions of approval have been imposed.
EXC-2016-01 21124 Greenleaf Drive March 17, 2016
Page 3
OUTREACH/NOTICING
The following table is a brief summary of the noticing conducted for this project:
Notice of Public Hearing Notices &Site
Notice
Agenda
Site Signage (10 days prior to the hearing)
Notices mailed to property owners
adjacent to the project site (10 days prior
to the hearing)
Posted on the City's official notice bulletin
board (one week prior to the hearing)
Posted on the City of Cupertino’s Web site
(one week prior to the hearing)
No comments were received from any member of the public at the time of staff report
production.
PERMIT STREAMLINING ACT
This project is subject to the Permit Streamlining Act (Government Code Section 65920 – 65964).
The City has complied with the deadlines found in the Permit Streamlining Act.
Project Received: January 7, 2016
Deemed Complete:February 5, 2016
The City has 60 days until April 5, 2016 to make a decision on the project since this project is
Categorically Exempt from CEQA. The Design Review Committee’s decision on this project is
final unless appealed to the City Council within 14 calendar days of the decision.
CONCLUSION
Staff recommends approval of the project since the conditions of approval address all concerns
related to the proposed project and all of the findings for approval of the proposed project are
consistent with Chapter 19.19.28.140(E) of the Cupertino Municipal Code.
Prepared by:Catarina Kidd, Senior Planner
Approved by:Benjamin Fu, Assistant Director of Community Development
Attachments
1. Draft Resolution
2. Plan Set
EXC-2016-01
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
DRAFT RESOLUTION
OF THE DESIGN REVIEW COMMITTEE OF THE CITY OF CUPERTINO
APPROVING AN EXCEPTION FROM THE RESIDENTIAL SINGLE FAMILY ZONING
REGULATIONS TO ALLOW THE CONVERSION OF ONE BAY OF AN EXISTING
GARAGE INTO A MEDIA ROOM, AND CONSTRUCT A 20'-8" BY 10'-5" SINGLE-BAY
GARAGE AT THE FRONT OF THE HOUSE, RESULTING IN AN 11’ FRONT YARD
SETBACK WHERE 20’ IS REQUIRED AT 21124 GREENLEAF DRIVE
SECTION I: PROJECT DESCRIPTION
Application No.:EXC-2016-01
Applicant:Richard Hartman (Li residence)
Location:21124 Greenleaf Drive, APN: 326-28-097
SECTION II: FINDINGS
WHEREAS, the Design Review Committee of the City of Cupertino received an
application for an Exception from the Residential Single Family Zoning regulations as
described in Section I. of this Resolution; and
WHEREAS, the Project is Categorically Exempt from the requirements of the California
Environmental Quality Act pursuant to Section 15303, Class 3 (New construction or
conversion of small structures); and
WHEREAS, the necessary notices have been given in accordance with the Procedural
Ordinance of the City of Cupertino, and the Design Review Committee has held at least
one Public Hearing on this matter; and
WHEREAS, the applicant has met the burden of proof required to support said
application; and
WHEREAS, the Design Review Committee finds the following with regard to the
exception for this application:
Draft Resolution EXC-2016-01 March 17, 2016
Page - 2 -
1. That the literal enforcement of the provisions of this title will result in restrictions
inconsistent with the spirit and intent of this title.
a. The lot contains less area (6,867 sq. ft) than required by its zoning designation (10,000
sq.ft.).
b. The triangular-shaped lot with a long, curved front property line is unusual to the
neighborhood, where the typical lot is a conforming, rectangular shape with front yard,
two sides and rear yard.
c. While non-conforming in setback and individual dimensions, the garage proposal of two
separate one-car bays meets the enclosed parking requirement when combined. Each bay
is 20’ deep and 10’5-6” wide.
d. The interior conversion of the existing garage to media room allows reasonable addition
of conditioned living space, while minimizing impacts to adjacent neighbors by
maintaining a one-story home and by observing the existing 11’ setback at the front of the
home established through the 2008 approval.
2. That the granting of exception will not result in a condition that will be injurious to
property or improvements in the area nor be materially detrimental to the public
health, safety, or welfare.
The granting of exception will not result in a condition that will be injurious to property or
improvements in the area nor be materially detrimental to the public health, safety, or welfare
because the interior conversion of the existing garage to media room allows reasonable
addition of conditioned living space, while minimizing impacts to adjacent neighbors by
maintaining a one-story home and by observing the existing 11’ setback at the front of the
home established through the 2008 approval.
3. The exception granted will not result in a hazardous condition for pedestrian or
vehicular traffic.
The exception granted will not result in a hazardous condition for pedestrian or vehicular
traffic because the addition maintains an 11’ front yard setback and maintains the minimum
onsite parking spaces. There is an existing sidewalk along the front of the home that will not
be altered and the addition does not change vehicular traffic.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of the maps, facts, exhibits, testimony and other evidence
submitted in this matter, subject to the conditions which are enumerated in this
Resolution beginning on PAGE 3 thereof:
1. The application for an Exception to the Residential Single Family zoning regulations,
Application no. EXC-2016-01 is hereby APPROVED, and
Draft Resolution EXC-2016-01 March 17, 2016
Page - 3 -
That the sub-conclusions upon which the findings and conditions specified in this
Resolution are based and contained in the Public Hearing record concerning
Application no.(s) EXC-2016-01 as set forth in the Minutes of Design Review Committee
Meeting of March 17, 2016 and are incorporated by reference as though fully set forth
herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPT.
1. APPROVED EXHIBITS
The approval is based on the plan set titled “Addition and Remodel for: Alan & Mu
Li, 21124 Greenleaf Drive, Cupertino, CA 95014” and received by the City on
January 7, 2016, except as may be amended by the Conditions contained in this
Resolution.
2. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant to
Government Code Section 66020(d) (1), these Conditions constitute written notice of
a statement of the amount of such fees, and a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90-day
approval period in which you may protest these fees, dedications, reservations, and
other exactions, pursuant to Government Code Section 66020(a), has begun. If you
fail to file a protest within this 90-day period complying with all of the requirements
of Section 66020, you will be legally barred from later challenging such exactions.
3. COMPLIANCE WITH PUBLIC WORKS CONFIRMATION FORM
The project shall comply with the requirements indicated on the Public Works
Confirmation form dated January 13, 2016, including, but not limited to, dedications,
easements, off-site improvements, undergrounding of utilities, all necessary
agreements, and utility installations/relocations as deemed necessary by the Director
of Public Works and required for public health and safety. The Public Works
Confirmation is a preliminary review, and is not an exhaustive review of the subject
development. Additional requirements may be established and implemented during
the construction permitting process. The project construction plans shall address
these requirements with the construction permit submittal, and all required
improvements shall be completed to the satisfaction of the Director of Public Works
prior to final occupancy.
Draft Resolution EXC-2016-01 March 17, 2016
Page - 4 -
4. DEMOLITION REQUIREMENTS
All demolished building and site materials shall be recycled to the maximum extent
feasible subject to the Building Official. The applicant shall provide evidence that
materials were recycled prior to issuance of final demolition permits.
5. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS
a) All grading activities shall be limited to the dry season (April 15 to October 1),
unless permitted otherwise by the Director of Public works.
b) Construction hours and noise limits shall be compliant with all requirements of
Chapter 10.48 of the Cupertino Municipal Code.
c) Grading, street construction, underground utility and demolition hours for work
done more than 750 feet away from residential areas shall be limited to Monday
through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m.
Grading, street construction, demolition or underground utility work within 750
feet of residential areas shall not occur on Saturdays, Sundays, holidays, and
during the nighttime period as defined in Section 10.48.053(b) of the Municipal
Code.
d) Construction activities shall be limited to Monday through Friday, 7 a.m. to 8
p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not
allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night
time construction is allowed if compliant with nighttime standards of Section
10.48 of the Cupertino Municipal Code.
e) Rules and regulations pertaining to all construction activities and limitations
identified in this permit, along with the name and telephone number of an
applicant appointed disturbance coordinator, shall be posted in a prominent
location at the entrance to the job site.
f) The applicant shall be responsible for educating all contractors and
subcontractors of said construction restrictions.
g) The applicant shall comply with the above grading and construction hours and
noise limit requirements unless otherwise indicated
6. INDEMNIFICATION
Except as otherwise prohibited by law, the applicant shall indemnify and hold
harmless the City, its City Council, and its officers, employees and agents
(collectively, the “indemnified parties”) from and against any claim, action, or
proceeding brought by a third party against one or more of the indemnified
parties or one or more of the indemnified parties and the applicant to attack, set
aside, or void this Resolution or any permit or approval authorized hereby for the
project, including (without limitation) reimbursing the City its actual attorneys’ fees
and costs incurred in defense of the litigation. The applicant shall pay such
Draft Resolution EXC-2016-01 March 17, 2016
Page - 5 -
attorneys’ fees and costs within 30 days following receipt of invoices from City.
Such attorneys’ fees and costs shall include amounts paid to counsel not otherwise
employed as City staff and shall include City Attorney time and overhead costs and
other City staff overhead costs and any costs directly related to the litigation
reasonably incurred by City.
7. LANDSCAPE
The property owners shall install landscaping along the new garage wall visible
from Greenleaf Drive prior to final sign-off of the building permit.
PASSED AND ADOPTED this 17th day of March 2016, at a regular meeting of the
Design Review Committee of the City of Cupertino by the following roll call vote:
AYES:MEMBERS:
NOES:MEMBERS:
ABSTAIN:MEMBERS:
ABSENT:MEMBERS:
ATTEST:APPROVED:
Catarina Kidd Margaret Gong, Chair
Senior Planner Design Review Committee
D/WR =1 5 0 .0 0
L =1 7 8 .5 6
SSCCCC1'-6"20'-0 1/16"10'-1 13/16"
5'-0"
6'-0"20'-0 1/16"10'-4"
11'-0"
11'-0"
5'-0"10'-0"1" CHERRY
2" APRICOT
1" PLUM
PLANTERTO BE REMOVED
EXISTING
10' X 20' PARKING
GREENLEAF10" TREE
EX. LAWN
1" JAPANESE
MAPLE
8" ORNAMENTAL
PEAR DRIVEEX. FENCE
EX. LANDSCAPE AREAEX. FENCEEX. FENCEEX. JP &STREET LIGHT204.00204.00203.50202.50202.00202.00201.50201.50201.00201.00200.50202.50203.00203.001+001+502+002+503+003+05.44EX. 6" SSEX.SSFLUSHINGINLETPROPOSED
1" PLUM
FF = 205'FF = 206'GARAGEADDITIONFF = 204.81'
3" AUSTRALIAN
TEA TREE
3" AUSTRALIAN
TEA TREE
EXISTING 1-STORY HOUSEEXISTING 1-STORY HOUSE
EXISTING DETACHED
GARAGE
NPART GARAGE CONV.
326 - 28 - 097
R 1 - 10
6,867 S.F.
F.A.R. ALLOWED:
PROPOSED:
6,867 X .45 = 3,090 S.F.
2,026 S.F.
229 S.F.21124 GREENLEAF DRIVE, CUPERTINO, CA. 95014ADDITION AND REMODEL FOR:ALAN & MU LIRICHARD A. HARTMAN A.I.A.HOMETECARCHITECTURE, INC.619 NORTH FIRST STREET, SAN JOSE, CA 95112408/995-0496 HometecArch@hotmail.com15-024
RAH
1/4" = 1'-0"
2,212 S.F.
186 S.F.
GARAGE ADDITION:214 S.F.
TOTAL GARAGE:443 S.F.
A-2
2,662.11 = 38.7%
11 9-23-15
A.P.N. :
A-1
ZONING:
OCCUPANCY GROUP: R-3, U
Date
Scale
Drawn
Job
Sheet
of Sheets
REVISIONS BY
TYPE OF CONSTRUCTION: VB
LOT SIZE:
SCOPE OF WORK:
CONVERT PART OF EXISTING GARAGE TO A MEDIA ROOM.
ADD A 1-CAR GARAGE TO THE FRONT CORNER.
EXISTING HOUSE:
SHEET INDEX
A-1 SITE PLAN
A-2 EXISTING FLOOR PLAN, ELEVATIONS
A-3 NEW FLOOR PLAN
A-4 ELEVATIONS
A-5 SECTIONS
A-6 AREA CALC'S, ROOF PLAN
TOTAL HOUSE:
VICINITY MAPSITE DATA
SITE PLAN
GARAGE:
1" = 10'-0"
THIS PROJECT SHALL COMPLY WITH 2013 CBC, CRC, CMC, CPC, CEC,
CFC, CAL GREEN, CAL ENERGY CODE, AND LOCAL ORD.
1" = 10'-0"
2,448 = 35.6%EXISTING:
LOT COV. ALLOWED:
PROPOSED:
6,867 X .45(+ 5) = 3,433.5 S.F.
3,127.5 = 45.5%
(INCL. OVERHANGS)
2,841 = 41.37%EXISTING:
NO SETBACK
ENCROACHMENTS
ALLOWED - FIELD VERIFY
PLANNING
12-21-15 11
11
11
11
D/W606826683040SC2040SC26684030RS3040LS4040LS48683020RS3040SC
2030SC
2668
26682868
26687920FX786828682040DH
50682868
5040RS2040FX16070 3040LS2040DH26682468
2468
6068
5080609030685119926681630SC1660FX1660FX 2040DH16682468
2480
30804'-11" x 4'-11"
5'-11" x 4'-11"
5'-11" x 6'-10"
10'-2" x 10'-4"
8'-11" x 13'-11"
19'-11" x 19'-11"
7'-3" x 6'-6"
5'-3" x 10'-4"
10'-0" x 11'-4"
4'-11" x 10'-4"
12'-9" x 8'-2"
18'-3" x 12'-2"
15'-9" x 2'-11"
5'-3" x 3'-1"25'-7" x 15'-7"
14'-8" x 12'-8"
5'-3" x 7'-1"
3'-7" x 5'-2"
10'-3" x 12'-2"
2018 sq ft 2'-0" -5'-4" +2'-0" -54'-2" -1'-2" +8'-2" -1'-4" -25'-6" +8'-3" -4'-5" +5'-4" -14'-9" -3'-0"3'-10"7'-2" +4'-0"17'-0" -2'-11" -3'-8" -5'-7" +3'-10" -1'-0"63'-0"12'-1"2'-4"7'-0" -5'-7" +12'-6"3'-6"20'-0"3'-8"
62'-9"
3'-10" -11'-3" +8'-0"10'-11"5'-4"9'-4"10'-5"
3'-5" +
3'-0"2'-4"2'-8"3'-0"7'-0" -
24'-1" -
20'-0"4'-1" -
2'-4"16'-0"2'-4"7'-3" +5'-4" -2'-2" +5'-4"3'-6"1'-4" -8'-2" -1'-3" +4'-0"7'-1"3'-4" +3'-0" -2'-8" -5'-8" -2'-8" -
16'-0" -
LAUNDRY
BEDROOM #3
BEDROOM #2
BATH
BATH
CLOSET
HALL
KITCHEN
DININGBEDROOM #4
CLOSET
MASTER BDRM
GARAGE
BATH
PANTRY
LIVING HALL
ENTRY
8'-0" CEILING
9'-0" CEILING 60 X 60" TUB11'-0" CEILING
10'-0" CEILING
8'-0" CEILING
8'-0" CEILING 8'-0" CEILING
8'-0" CEILING
8'-0" CEILING
9'-0" CEILING
TEMP60 X 42"
SHOWER
BATH
LIVING AREA
PULL-DOWN ATTIC STAIR
8'-0" CEILING
8'-0" CEILING
F.A.U. IN ATTIC
WALL MOUNT TANKLESS
GAS WATER HEATER
WALL MOUNT TANKLESS
GAS WATER HEATER
PULL-DOWN ATTIC STAIR
9'-0" CEILING
10'-0" CEILING
8'-0" CEILING
OPENER
CFL
CFL
NWEST ELEVATION
SOUTH ELEVATION
EAST ELEVATION
NORTH ELEVATION
A-2 21124 GREENLEAF DRIVE, CUPERTINO, CA. 95014ADDITION AND REMODEL FOR:ALAN & MU LIRICHARD A. HARTMAN A.I.A.HOMETECARCHITECTURE, INC.619 NORTH FIRST STREET, SAN JOSE, CA 95112408/995-0496 HometecArch@hotmail.com15-024
RAH
1/4" = 1'-0"
EXISTING FLOOR PLAN
9-23-15Date
Scale
Drawn
Job
Sheet
of Sheets
REVISIONS BY
PLANNING
12-21-15 11
CO
SD
R
WP
DM
GFCI
3
SYMBOLS & LEGEND
(FLOOR) (WALL)
NEW WALLS
AFCI PROTECTED
DUPLEX OUTLET
220V OUTLET
GFCI PROTECTED OUTLET
GFCI PROTECTED
WEATHERPROOF OUTLET
WALL SWITCH
(FLUORES. LED ONLY)
WALL SWITCH, MANUAL ON,
AUTO OFF
3-WAY WALL SWITCH
(FLUORES. LED ONLY)
WALL MOUNT L.E.D. LIGHT
CEILING MOUNT L.E.D. LIGHT
CEILING MOUNT FLUORES. LIGHT
UNDER CAB. FLUORES. LIGHT
RECESSED L.E.D. LIGHT
HEATER REGISTER
SMOKE DETECTOR (A/C, D/C)
INTERCONNECTED
EXHAUST FAN VENTED
TO OUTDOORS
EXHAUST FAN/L.E.D. LIGHT
VENTED TO OUTDOORS
CEILING FAN
WALLS TO BE REMOVED
EXISTING WALLS TO REMAIN
DIMMER WALL SWITCH
1-HOUR FIRE WALLS
VS
LISTED CARBON MONOXIDE
DET. (A/C, D/C)
INTERCONNECTED
19. ALL ELECTRIC SWITCHES SHALL BE OF THE SCREW TYPE GROUND.
20. ALL BRANCH CIRCUITS IN ALL ROOMS OTHER THAN KITCHEN & BATHS
SHALL BE PROTECTED BY COMBINATION ARCH-FAULT CIRCUIT
INTERRUPTERS.(C.E.C. 210.12.B)
18. LAUNDRY ROOM AND BATHROOM COUNTERTOP OUTLETS SHALL BE
EACH SUPPLIED WITH A DEDICATED 20 AMP CIRCUIT
13. SHOWER AND TUB/SHOWER COMBINATIONS SHALL BE PROVIDED WITH
PRESSURE BALANCE ANTI-SCALD VALVES TO 120f MAX. WITH MAX. 2.0 GPM
FLOW @ 80 PSI, SINK FAUCETS MAX. 1.5 GPM FLOW @ 20 PSI.
14. SHOWER COMPARTMENTS, REGARDLESS OF SHAPE, HAVING A MINIMUM
INTERIOR FLOOR AREA OF 1,024 SQUARE INCHES, SHALL ALSO BE CAPABLE
OF ENCOMPASSING A 30-INCH CIRCLE, AND OUTWARD SWING 22" MIN. DOOR
11. ALL WATER CLOSETS SHALL BE MAXIMUM 1.28 GALLONS PER FLUSH
8. TERMINATION OF ALL ENVIRONMENTAL AIR DUCTS (I.E., DRYERS, BATH &
UTILITY FANS, ECT.) SHALL BE A MINIMUM OF 3 FEET AWAY FROM ANY
OPENINGS INTO THE BUILDING (DOORS, WINDOWS, OPENING SKYLIGHTS, OR
ATTIC VENTS)
9. ALL AIR DUCTS PENETRATING A SEPARATION WALL OR CEILING BETWEEN
GARAGE AND LIVING AERA SHALL BE 26 GA. MINIMUM
12. PROVIDE A SMOOTH, HARD, NONABSORBENT SURFACE OVER
A MOISTURE RESISTANT UNDERLAYMENT TO A MINIMUM HEIGHT
OF 72" ABOVE THE DRAIN INLET AT SHOWERS & TUB/SHOWERS
(NO GREEN BOARD)
7. PROVIDE EMERGENCY EGRESS FROM SLEEPING ROOMS, MIN.
WINDOW OPENINGS OF 24" MIN. CLEAR HEIGHT, 20" MIN. CLEAR
WIDTH, 5.7 SQ. FT. MIN. AREA WITH 44" MAXIMUM TO BOTTOM
5. SLOPE FINISH GRADE AT 5% MIN. FOR 10' AWAY
FROM HOUSE & 1% MIN. TO AN APPROVED FACILITY
4. INSTALLATION INSTRUCTIONS FOR ALL LISTED EQUIPMENT SHALL BE
POSTED AND PROVIDED TO THE FIELD INSPECTOR AT TIME OF INSPECTION
6. PROVIDE NON-REMOVABLE BACK FLOW PROTECTION AT ALL
EXTERIOR HOSE BIBBS
2. ADJUST DIMENSIONS TO ALIGN WITH EXISTING CONDITIONS IN THE
FIELD, WHERE APPLICABLE.
1. ALL DIMENSIONS ARE TO FACE OF STUD, UNLESS NOTED OTHERWISE
3. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
IF ANY DISCREPANCIES ARE FOUND, NOTIFY ARCHITECT IMMEDIATELY.
10. ALL EXHAUST FANS SHALL BE "ENERGY STAR" AND
SEPARATELY SWITCHED WITH TIMER OR HUMIDISTAT SWITCHES
AND CAPABLE OF 5 AIR CHANGES PER HOUR (MIN. 50 CFM) AT
BATHS, TOILETS, AND LAUNDRY
17. ELECTRIC DRYERS AND COOKTOPS SHALL HAVE A DEDICATED 30 AMP
CIRCUIT, PROVIDE WIRES WITH INSULATED NEUTRAL.
16. KITCHEN SHALL HAVE SEPARATE CIRCUITS FOR DISPOSAL,
DISHWASHER, & TWO (2) 20 AMP CIRCUITS LIMITED TO SUPPLYING WALL
AND COUNTER SPACE OUTLETS.
GENERAL NOTES
22. A PERMANENT LABEL SHALL IDENTIFY EACH LITE OF SAFETY GLAZING
23. T-24 INSTALLATION CERTIFICATE (CF-2R-LTG-01-E) SHALL BE
SUBMITTED TO THE FIELD INSPECTOR AT TIME OF FINAL INSPECTION.
21. LIGHT FIXTURES LOCATED OVER OR WITH-IN 3' OF TUBS OR SHOWER
ENCLOSURES SHALL BE LABELED "SUITABLE FOR DAMP LOCATIONS"
24. RECESSED LUMINARIES IN INSULATED CEILINGS SHALL BE A.T. & I.C.
RATED, ELECTRONIC BALLAST AND CAULKED AIR-TIGHT
15. ALL UNDERFLOOR PLUMBING CLEANOUTS SHALL BE WITHIN 20' OF THE
UNDERFLOOR ACESS, OR EXTENDED TO THE EXTERIOR
25. DRYER EXHAUST VENTS SHALL BE PER MANUF. REQUIRMENTS OR
MAX. 14' IN LENGTH, TERMINATING 3' CLEAR OF ANY OPENING
26. JOINTS AND SEAMS OF DUCT SYSTEMS SHALL BE SEALED WITH
UL 181 LISTED DUCT TAPE, AND INSULATED WITH R-6 MIN.
27. ALL PENETRATIONS INTO UNCONDITIONED SPACE (ATTICS, UNDERFLOORS,
ECT.) SHALL BE CAULKED, GASKETED, WEATHERSTRIPPED, OR SEALED TO
LIMIT INFILTRATION AND EXFILTRATION.
31. SMOKE DETECTORS SHALL BE INSTALLED IN ALL BEDROOMS AND AT
AREAS LEADING TO BEDROOMS.
28. ALL PENETRATIONS IN TOP PLATES, FLOORS, ETC. SHALL BE CAULKED
WITH A RESIDENTIAL FIRE RATED CAULK WITH AN ASTM E136 OR E814 RATING
29. EGRESS WINDOWS WITH MULTIPLE LATCHES SHALL HAVE THEM
INTERCONNECTED AND OPERABLE FROM THE LOWEST LATCH.
30. SHOWER ENCLOSURE DOORS SHALL OPEN OUT WITH A CLEAR OPENING
OF 22" MIN. IN THE OPEN POSITION
32. ALL 15-AMP AND 20-AMP DWELLING UNIT RECEPTACLE OUTLETS SHALL
BE LISTED TAMPER-RESISTANT RECEPTICALS (CEC 406.11)
33. MAIN ENTRY DOOR SHALL BE OPENABLE FROM THE INSIDE OF THE
DWELLING WITHOUT THE USE OF A KEY, SPECIAL KNOWLEDGE OR EFFORT.
34. KITCHEN FAUCETS SHALL HAVE A MAXIMUM FLOW RATE NOT TO EXCEED
1.8 GPM AT 60 PSI. CGBSC SECT. 4.303.1.4.4
35. VENTILATION HEATING AND AIR CONDITIONING SYSTEMS SHALL HAVE A
MERV-6 FILTER OR BETTER.
36. PROVIDE STATE ARCHITECT CERTIFIED EARTHQUAKE-ACTUATED GAS
SHUT OFF VALVES AT ALL NEW, RELOCATED, AND REPLACED GAS UTILITY
METERS.
37. PROVIDE A DEDICATED 20 AMP CIRCUIT FOR EACH FAN MOTOR (F.A.U.,
EXHAUST, ECT.)
38. PROVIDE COMBO SMOKE/CARBON MONOXIDE DETECTORS AT HALLWAYS
ON EACH LEVEL,AND OUTSIDE OF BEDROOMS
40. FOR ANY L.E.D. LIGHTS TO QUALIFY AS HIGH EFFICACY LIFTING, THEY
MUST BE CERTIFIED BY THE ENERGY COMMISSION AND LISTED ON THEIR
DATABASE AT http://www.appliances.energy.ca.gov/. PROVIDE TO THE FIELD
INSPECTOR EVIDENCE OF CERTIFICATION FOR ALL HIGH EFFICACY L.E.D.
LIGHTS AS SELECTED BY THE OWNER.
39. A GAS PIPING LAYOUT PLAN SHALL BE PROVIDED TO THE FIELD
INSPECTOR BY THE CONTRACTOR AT TIME OF INSPECTION.
CAL-GREEN MANDATORY MEASURES
41. ALL PLUMBING FIXTURES AND FITTINGS SHALL MEET THE STANDARDS
REFERENCED IN TABLE1401.1 OF THE 2013 CPC.
1. CONTRACTOR SHALL IMPLEMENT AND MANAGE THE STORM WATER DRAINAGE DURING CONSTRUCTION.
2. SITE GRADING & DRAINAGE SYSTEM MEASURES SHALL BE IN PLACE TO KEEP WATER AWAY FROM
BUILDING.
3. T-24 ENERGY REPORT SHALL BE ATTACHED AND PRINTED INTO THE SET. SEE SHEETS T-24.
4. WALLS WITH 2X6 AND LARGER FRAMING SHALL HAVE R-19 INSULATION, MIN.
5. ALL COPPER HOT WATER PIPES SHALL BE FULLY INSULATED.
6. ALL INDOOR ROOMS SHALL HAVE THE NEW MANDATORY REQUIREMENTS, PER GBC 150.0(k)
7. JOINTS AND SEAMS OF DUCT SYSTEMS SHALL BE SEALED WITH UL 181 LISTED DUCT TAPE, AND
INSULATED WITH R-6 MIN.
8. AIR DUCTS SHALL BE LEAK TESTED (HERS) TO MAX. 6% WITHOUT AIR HANDLER, AND 4% WITH AIR
HANDLER.
9. HEATING AND AIR CONDITIONING SYSTEMS SHALL BE DESIGNED IN ACCORDANCE WITH THE
REQUIREMENTS OF CGBSC SEC 4.507.2
10. A AGS SUPPLY LINE OF 200,000 BTU/HR MIN. SHALL BE SUPPLIED TO THE WATER HEATER WITH 120
VOLT RECEPTACLE.
11. HERS Verification required for the HVAC cooling, HVAC distribution systems, HVAC fan systems, and IAQ
(indoor air qualify) fans. Provide evidence of a Third-Party Verification (HERS) to project building inspector,
prior to final building inspection.
12. ALL FENESTRATION AND SKYLIGHTS SHALL HAVE A U-FACTOR OF 0.58 OR BETTER.
13. FOR ANY L.E.D. LIGHTS TO QUALIFY AS HIGH EFFICACY LIFTING, THEY MUST BE CERTIFIED BY THE
ENERGY COMMISSION AND LISTED ON THEIR DATABASE AT http://www.appliances.energy.ca.gov/. PROVIDE
TO THE FIELD INSPECTOR EVIDENCE OF CERTIFICATION FOR ALL HIGH EFFICACY L.E.D. LIGHTS AS
SELECTED BY THE OWNER.
14. HEATING AND AIR CONDITIONING SYSTEMS SHALL BE DESIGNED IN ACCORDANCE WITH THE
REQUIREMENTS OF CGBSC SEC 4.507.2
15. PLYWOOD (OR OSB) ROOF SHEATHING WITH RADIANT BARRIER REQUIRED.
16. WINDOWS SHALL HAVE A REDUCED U-FACTOR OF 0.32 AND SHGC OF 0.25 OR BETTER.
17. THE EFFECTIVE FLUSH VOLUME OF ALL TOILETS WILL NOT EXCEED 2.28 GALLONS PER FLUSH.
18. THE MAXIMUM ALLOWED REDUCED FLOW RATES FOR PLUMBING FIXTURES REQUIRED TO COMPLY WITH
CAL-GREEN ARE AS FOLLOWS:
1.28 GALLONS PER FLUSH FOR TOILETS
1.0 GALLONS PER FLUSH FOR URINALS
2.0 GPM FOR SHOWERHEADS
1.5 GPM FOR ANY LAV. FAUCETS
1.8 GPM FOR KITCHEN FAUCET
19. AN AUTOMATIC IRRIGATION SYSTEM CONTROLLER WITH RAIN SENSER SHALL BE PROVIDED AND
INSTALLED PRIOR TO FINAL INSPECTION.
20. ANNULAR SPACES AROUND PIPES, ELECTRIC CABLES, CONDUITS OR OTHER OPENINGS IN SOLE/
BOTTOM PLATES AT EXTERIOR WALLS SHALL BE PROTECTED AGAINST THE PASSAGE OF RODENTS BY
CLOSING SUCH OPENINGS WITH CEMENT MORTAR, CONC. MASONRY, OR SIMILAR ACCEPTABLE METHODS.
CGBSC SEC. 4.406.1
21. DOCUMENTATION SHALL BE PROVIDED, PROIR TO THE FIRST INSPECTION, CONFIRMING COMPLIANCE TO
THE WASTE MANAGEMENT PLAN PROVIDED TO THE JURISDICTION. CGBSC 4.408.2.1
22. AT FINAL INSPECTION, A MANUAL, COMPACT DISC, WEB-BASED REFERENCE, OR OTHER ACCEPTABLE
MEDIA INCLUDING ITEMS 1 - 10 IN ACCORDANCE TO CGBSC SEC. 4.410.1 SHALL BE PLACED IN THE
BUILDING.
23. DIRECT-VENT GAS FIREPLACE WITH SEALED COMBUSTION SHALL BE INSTALL PER MANUFACTURER'S
INSTALLATION INSTRUCTIONS.
24. ANY PELLET OR WOOD BURNING STOVE SHALL COMPLY WITH EPA PHASE II EMISSIONS LIMITS.
25. ALL DUCT AND OTHER RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH
TAPE, PLASTIC, SHEET METAL, OR OTHER ACCEPTABLE METHODS AT THE TIME OF ROUGH INSTALLATION
OR DURING STORAGE ON THE CONSTRUCTION SITE AND UNTIL FINAL STARTUP OF THE HEATING AND
COOLING EQUIPMENT. CGBSC SEC. 4.504.1
26. ADHESIVES, SEALANTS, AND CAULKS SHALL COMPLY WITH LOCAL , REGIONAL AIR POLLUTION AND
AIR QUALITY MANAGEMENT DISTRICT STANDARDS.
27. PAINTS AND COATINGS SHALL COMPLY WITH VOC LIMITS.
28. AEROSOL PAINTS AND COATINGS SHALL COMPLY WITH PRODUCT-WEIGHTED MIR LIMITS FOR ROC
AND OTHER REQUIREMENTS.
29. DOCUMENTATION SHALL BE PROVIDED TO THE FIELD INSPECTOR OF COMPLIANCE WITH VOC LIMITS
FOR FINISH MATERIALS.
30. ALL CARPET SYSTEMS INSTALLED SHALL MEET THE TESTING AND PRODUCT REQUIREMENTS IN
CGBC.
31. WHERE RESILIENT FLOORING IS INSTALLED, AT LEAST 80% OF THE INSTALLED FLOOR AREA WILL
COMPLY WITH CGBC.
32. HARDWOOD PLYWOOD, PARTICLE BOARD, AND MEDIUM-DENSITY FIBER BOARD COMPOSITE WOOD
PRODUCTS USED ON THE INTERIOR AND EXTERIOR OF THE BUILDING WILL COMPLY WITH THE LOW
FORMALDEHYDE EMISSIONS STANDARDS.
33. A CAPILLARY BREAK WILL BE INSTALLED IF A SLAB ON GRADE FOUNDATION IS USED.
34. BUILDING MATERIALS WITH VISIBLE SIGNS OF WATER DAMAGE WILL NOT BE INSTALLED. WALL AND
FLOOR FRAMING WILL NOT BE ENCLOSED WHEN THE FRAMING MEMBERS EXCEED 19% MOISTURE
CONTENT. MOISTURE CONTENT WILL BE VERIFIED PRIOR TO FINISH MATERIAL BEING APPLIED.
35. ENERGY STAR COMPLIANT EXHAUST FANS SHALL BE PROVIDED IN EVERY BATHROOM, DUCTED TO
TERMINATE OUTSIDE THE BUILDING. ALL EXHAUST FANS MUST BE CONTROLLED INDEPENDENTLY BY A
HUMIDISTAT OR TIMER SWITCH.
36. THE HEATING AND AIR CONDITIONING SYSTEM WILL BE SIZED, DESIGNED AND HAVE THEIR
EQUIPMENT USING THE FOLLOWING METHODS:
1. HEAT LOSS/HEAT GAIN VALUES IN ACCORDANCE WITH ANSI/ACCA 2 MANUAL J 2004 OR EQUAL
2. DUCT SYSTEMS ARE SIZED ACCORDING TO ANSI/ACCA 1, MANUAL D 2009 OR EQUAL.
3. SELECT HEATING AND COOLING EQUIPMENT IN ACCORDANCE WITH ANSI/ACCA 3, MANUAL S 2004
OR EQUAL.
37. HVAC SYSTEM INSTALLERS WILL BE TRAINED AND CERTIFIED IN THE PROPER INSTALLATION OF HVAC
SYSTEMS AND EQUIPMENT BY A RECOGNIZED TRAINING/CERTIFICATION PROGRAM.
38. UPON REQUEST, VERIFICATION OF COMPLIANCE WITH THIS CODE MAY INCLUDE: CONSTRUCTION
DOCUMENTS, PLANS, SPECIFICATIONS, BUILDER OR INSTALLATION CERTIFICATION, INSPECTION REPORTS,
OR OTHER METHODS ACCEPTABLE TO THE BUILDING DIVISION THAT WILL SHOW SUBSTANTIAL
CONFORMANCE WITH THE 2013 CODE REQUIREMENTS. D/W606826682040SC26684040LS48683020RS3040SC
2030SC
2668
4040LS26682868
8070 3040LS3040LS2868506871120FX286836204030RS3040LS 2040DH
50682868
5040RS2040FX4068
8070 3040LS2040DH26682468
3040SC2468
6068
5068 5080609030685119926681630SC26681660FX1660FX 2040DH166826682468
2480
3080R
R
R
R
RRR
RR
SD SD
SD
SD
SD
GFCI
GFCIGFCI
GFCI
GFCI
R
R
R R
RR
RR
RRR
R
R
RR
RR
R
T
ML
GFCI
C5/TVC5/TV
WP
WP
GFCI GFCI
ML
GFCI
ML
GFCI
DC
3DM
ML
3DM
DM
GFCI
GFCI
DM
DM
T
DM
WP
DM
GFCI
GFCI
C5/TV
WP
C5/TV
3 ML
DMDM
WP
GFCI
C5/TV
GFCI
GFCI
DM
DM
T
DM
GFCIGFCIGFCI
GFCI ML
GFCI
GFCI
WP
WP
WP
DM
3
3
ML
C5/TV
3DM GFCIML
C5/TV
DM
DM
DM
DM
C5/TV
2426 sq ft1'-4" +1'-0"20'-2" -82'-6"12'-1"2'-4"6'-8" -5'-11" +12'-6"3'-6"8'-0"8'-10"2'-0"20'-8"1'-0"
4'-0"2'-0" -5'-4" +2'-0" -54'-3" +1'-3" +8'-2" -1'-4" -25'-5" +8'-7" -4'-1" -5'-5" +14'-9" -16'-11" +2'-6" +3'-10" +5'-9" +3'-10" -1'-0"3'-3" -
3'-0"2'-4"2'-8"3'-0"6'-11" +
10'-8"3'-9" -20'-0"10'-6" +
10'-5"
LAUNDRY
BEDROOM #3
BEDROOM #2
BATH
BATH
CLOSET
KITCHEN
DININGBEDROOM #4
CLOSET
MASTER BDRM
GARAGE
BATH
PANTRY
LIVING HALL
ENTRY
8'-0" CEILING
GARAGE
11'-0" CEILING
10'-0" CEILING
8'-0" CEILING
8'-0" CEILING 8'-0" CEILING
8'-0" CEILING
8'-0" CEILING
9'-0" CEILING
TEMPDN 6"
BATH
LINEN
PULL-DOWN ATTIC STAIR
8'-0" CEILING
8'-0" CEILING
F.A.U. IN ATTIC
WALL MOUNT TANKLESS
GAS WATER HEATER
PULL-DOWN ATTIC STAIR
9'-0" CEILING
10'-0" CEILING
GAS
PATCH PANEL
ARCH1
FAMILY
CLOSET
18'' x 24'' MIN. CRAWL SPACE
ACCESS WITH WEATHERSTRIP
+96"
20 AMP DED. LINE
+96"
200 AMP ELEC. PANEL
+96"
PULL-DOWN
ATTIC STAIR
1
LIVING AREA
1
TO BE REMOVED
1
NA-3NEW FLOOR PLAN 21124 GREENLEAF DRIVE, CUPERTINO, CA. 95014ADDITION AND REMODEL FOR:ALAN & MU LIRICHARD A. HARTMAN A.I.A.HOMETECARCHITECTURE, INC.619 NORTH FIRST STREET, SAN JOSE, CA 95112408/995-0496 HometecArch@hotmail.com15-024
RAH
1/4" = 1'-0"
9-23-15Date
Scale
Drawn
Job
Sheet
of Sheets
REVISIONS BY
PLANNING
12-21-15 11
17'-6"13'-0"17'-6"17'-6"17'-6"ATTIC VENT FANS ON THERMOSTAT
21124 GREENLEAF DRIVE, CUPERTINO, CA. 95014ADDITION AND REMODEL FOR:ALAN & MU LIRICHARD A. HARTMAN A.I.A.HOMETECARCHITECTURE, INC.619 NORTH FIRST STREET, SAN JOSE, CA 95112408/995-0496 HometecArch@hotmail.com15-024
RAH
1/4" = 1'-0"
COMPOSITION SHINGLES TO MATCH EXISTING WITH
30 LB. FELT UNDERLAYMENT, CLASS 'A', INSTALL
PER MANUFACTURER'S INSTRUCTIONS
A-4
7/8'' (3) COAT STUCCO OVER METAL
LATH OVER (2) LAYERS GRADE "D"
BUILDING PAPER .(PER C.B.C. 2512)
26 GA. GALV. WEEP SCREED, 4" MIN. ABOVE
GRADE, 2" MIN ABOVE CONCRETE (TYP.)
36'' CONCRETE LANDING AS REQUIRED, 4'' MIN. 7"
MAX. STEP DOWN WITH 3/4" MAX. THRESHOLD@
SLIDERS & 1/2" MAX. THRESHOLD @ DOORS
SLOPE FINISH GRADE AT 5% MIN. FOR 10'
AWAY FROM HOUSE & 1% MIN. TO AN
APPROVED FACILITY
SOUTH ELEVATION
WEST ELEVATION
EAST ELEVATION
NORTH ELEVATION
MIN. 4" TALL STREET ADDRESS NUMERALS
OF CONTRASTING COLOR TO BACKGROUND.
PROVIDE CROSS-VENTING OPENINGS OF 1/150
UNDERFLOOR AREA (COVER WITH 26 GA. GALV. 1/4''
MESH) PER C.B.C. 1203.3
PROVIDE CROSS-VENTING OPENINGS OF 1/150 ATTIC
AREA (COVER WITH 26 GA. GALV. 1/4'' MESH) 50%
VENTS TO BE 36" ABOVE CEILING PER C.B.C. 1203.2
9-23-15EXISTINGPROPOSEDDate
Scale
Drawn
Job
Sheet
of Sheets
REVISIONS BY
PLANNING
12-21-15 11
EXISTING / NATURAL GRADE
EXISTING / NATURAL GRADE
EXISTING / NATURAL GRADE
11
11
11
21124 GREENLEAF DRIVE, CUPERTINO, CA. 95014A-5ADDITION AND REMODEL FOR:ALAN & MU LIRICHARD A. HARTMAN A.I.A.HOMETECARCHITECTURE, INC.619 NORTH FIRST STREET, SAN JOSE, CA 95112408/995-0496 HometecArch@hotmail.com15-024
RAH
1/4" = 1'-0"
SECTION
SECTION
11
22
5/8'' TYPE ''X'' GYP. BD.
1/2'' GYP. BD. (TYP.)
9-23-15Date
Scale
Drawn
Job
Sheet
of Sheets
REVISIONS BY
TYPICAL WINDOW TRIM44
55 TYPICAL WINDOW TRIM
PLANNING
12-21-15 11
D/W1'-4" +1'-0"20'-2" -20'-0"10'-6" +
10'-5"7'-8"10'-7" +6'-0"6'-0"
24'-4"27'-6" +19'-2" +11'-0"
20'-8"14'-9" -7'-8" +11'-0" +13'-0"
15'-8"5'-11"1'-11"8'-0"8'-0"8'-7" -13'-5" +3'-9"3'-9"3'-9"
3'-9"
15'-1"21'-1" -44'-0"
1
1
1
K
1
B
A
C
D
E
F
G
H
I
J
N5 : 12 5 : 125 : 12 5 : 125 : 125 : 12
5 : 12
5 : 12 5 : 125 : 125 : 12
5 : 125 : 125 : 12
5 : 125 : 125 : 12
5 : 125 : 125 : 125 : 125 : 125 : 125 : 125 : 12
5 : 12
A-6
AREA CALCULATIONS
A ; 44 X 21.08 = 927.52
B ; 15.08 X 13.41 -(3.75 X 3.75 / 2) = 195.15
C : 8 X 8.58 - (6 X 6 / 2) = 50.64
D : 8 X 1.91 = 15.28
E : 15.66 X 5.91 = 92.55
F : 13 X 11 = 143
G : 7.66 X 10.63 - (7.66 X 7.66 / 2) =52.08
H : 24.33 X 27.5 = 669.07
I : 20.66 X 14.75 = 304.73
J : 11 X 19.16 = 210.76
K : 1 X 1.33 = 1.33
21124 GREENLEAF DRIVE, CUPERTINO, CA. 95014ADDITION AND REMODEL FOR:ALAN & MU LIRICHARD A. HARTMAN A.I.A.HOMETECARCHITECTURE, INC.619 NORTH FIRST STREET, SAN JOSE, CA 95112408/995-0496 HometecArch@hotmail.com15-024
RAH
1/4" = 1'-0"
9-23-15Date
Scale
Drawn
Job
Sheet
of Sheets
REVISIONS BY
TOTAL BUILDING = 2,662.11 S.F.
ROOF PLAN
PLANNING
12-21-15 11