Loading...
CC Resolution No. 04-291 RESOLUTION NO: 04-291 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO RESCINDING RESOLUTION NO. 03-069 AND EST ABLlSHING USER FEES WHEREAS, the State of California requires fees charged for service rendered not to exceed the cost of delivering said services; and WHEREAS, a public hearing has been held to review user fees; and WHEREAS, the City Council of the City of Cupertino has established guidelines for setting user fees; NOW, THEREFORE, BE IT RESOLVED that: I. User fees are established per attachments A through E. 2, All user fees previously established by Council action or resolution are hereby superseded. 3. User fees are effective July 1,2004, PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 19th day of April 2004 by the following vote: Vote Members of the City Council AYES: NOES: ABSENT: ABSTAIN: James, Kwok, Wang Sandoval Lowenthal None ATTEST: APPROVED: . ~ C~ ~c:L'A ayor, City ofCu#tino Department General Engineering Planning Building Recreation CITY OF CUPERTINO SUMMARy OF USER FEES Resolution 04-291/April19, 2004 Fees Effective July 1, 2004 Schedule A B C D E CITY OF CUPERTINO Resolution 04-29I/April19, 2004 Fees Effective July 1, 2004 Schedule A - Geueral Photocopies - per sheet Microfilm/Microfiche Printout Budget Documents Comprehensive Annual Financial Reports (CAFR) Returned Check Charge Late Payment on 30 Day Delinquent City Invoices Property Liens Administrative Fee Municipal Code Book Williamson Act Filings Tape Dubbing - Audio, Video, DVD, CD VHS DVD CD WebcastlCD Audio DV CAM/BETA CAM V-Matic MiniDV Audio Cassette Notary Fee Fingerprinting Processing Handbill Pennit Renewals Solicitor Pennit (Includes fingerprinting) Renewals Massage Establishment Fee (Includes fingerprinting and background check) Renewals Massage Therapist Fee (Includes fingerprinting and background check) Renewals $0.20 $0.50/frame $50,00 $30.00 $25.00 12% per annum $30 per book/block/parcellien $77.00 $105,00 $12.00/tape $20.00/DVD $12,OO/CD $50.00/tape $25.00/tape $30.00/DV $1.00/tape $lO.OO/signature State Fee $32,00 Plus $12.00 City Administrative Fee $93,00 $26.00 $140.00 $26.00 $184.00 $46.00 $184.00 $46.00 CITY OF CUPERTINO Resolution 04-29I1April19, 2004 Fees Effective July 1,2004 Schedule A - Geueral (coutiuued) Massage Managing Empioyee Fee (Includes fingerprinting and background check) Renewals $184,00 $46,00 Massage Permit Appeal (Denial/Revocation) $145.00 Taxi Driver Permits (Includes fingerprinting and background check) Renewals $184,00 $46.00 All Municipal Code Parking Violations $35.00 CVC Parking Citation Dismissals Admin. Fee $25.00 Noise Variances $140.00 Duplicate Business Licenses $20,00 Business License Exemption Administrative Fee $50,00 Business License Database $100,00 New Business Monthly Reports 15.00/month Community Festivals $8.00/day/vendor Farmers Market $2.00/week/vendor Flea Markets $8.50/month/vendor Sign Removal (Public Right-of-Way) $15.00/sign Dangerous Dog Annual Registration Fee $177.00 Internet Processing Fee $2.00/transaction Police Disturbances Actual Cost. Abatement Fee Actual Cost. Research and Compilation of New Records Fee (For information requests greater than 1/2 hour.) Actual Cost. Graffiti Cleanup Actual Cost. CITV 011 CUPERTINO Resolution 04-2911April 19, 2004 Fees Effective July 1, 2004 Schedule A - General (Continued) Public Requests for GIS Printed Maps Standard pre-formatted maps Plotted maps Printed maps $25.00 $2.00 Custom request maps Actual Cost" Public Requests for GIS Data Digital data layers for GIS Data $25.00/layer $200.00 for all city layers Custom request data layers on CDROM Actual Cost" Ortho-rectified aerial photography $25,OO/tile $300,00 full City of Cupertino (153 tiles) Damage to City Property Grounds, Streets, Facilities Traffic-Engineering Traffic-Maintenance Actual Cost" Code Enforcement Actual Cost. . Actual cost is: 1) Employee hourly rate plus 40% for benefits and overhead, and 2) cost of materials, contractors and supplies. CITY OF CUPERTINO Resolution 04-291/April19, 2004 Fees Effective July 1, 2004 Schedule B - Eugiueering Street Cuts Miscellaneous; greater of $870 minimum or 5% of cost improvements Utility; greater of$I,030 minimum or 5% of cost of improvements Grading permit; greater of $3,300 minimum or 6% of cost of improvements Pracel Map/Tract Map Parcel Map (1-4 lots) Tract Map (> 4 lots) Plan Check & Inspection Review of Building Permit Improvement Agreement Residential; greater of $2, 130 minimum or 5% of cost of improvements Commercial; greater of $3,440 minimum or 6% of cost of improvements Annexation (plus county filing fee) Certificates of Compliance Encroachment Permits Residential Non-Residential Annual Utility Company Lot Line Adjustment Soil & Geo Reports (plus any material/service fees) Short Report Long Report Geo Report Deposit Engineering Copies Engineering Micro fiche Traffic Micro fiche Improvement Plans Traffic Reports/Plans Microfilm Transportation Permit Single Annual Utility Company Telecommuncations Facility Fee (5% increase per year) Installation Rate Occupancy Rate Banners $870.00 minimum $1,303,00 minimum $3,300.00 minimum $3,250.00 $6,750.00 $1,700,00 $2,130,00 minimum $3,440.00 minimum $1,400.00 $1,200.00 $990.00 $1,000.00 $325.00 $2,300,00 $575.00 $575,00 $7,150.00 $30.00/sheet $40.00/sheet $30.00/sheet $40.00/sheet $33.00/sheet $500.00 $500.00 $1.74/lineal foot of conduitlyr $0.87/lineal ft, ofleased conduitlyr $320.00 CITY OF CUPERTINO Resolution 04-2911April19, 2004 Fees Effective July 1, 2004 Schedule B - Engineering (continued) * Aerial Photo Customer Work $240.00/sheet * Soil/Geo Report Research $1,200.00 * Special Events $1,090.00 * Schools - Traffic Request $1,230.00 * Insurance Review $315.00 * Block PartylParade ($950,00) No Charge * Vacation of Public Street ROW $460.00 * Small Traffic Calming Request $890.00 * Comprehensive Neighborhood Traffic Request $1,720,00 * Certificate of Correction $130.00 * Floodplain Evaluation $50.00 * Permit Parking Study $880.00 * Permit Parking Issuance $45,00 * Research $170.001hr. * New fees for 2004-05 per PRM Group fee study. CITY OF CUPERTINO Resolution 04-29I/April19, 2004 Fees Effective July 1, 2004 Schedule C - Definition of Planning Fee Services Major Five thousand or more square feet commercial; 10,000 or more square feet office/industrial; eight or more residential units, Minor Less than 5,000 square feet commercial; less than 10,000 square feet office/industrial; less than eight residential units, Appeal A request from the project applicant or interested party to reverse or amend a decision made by staff or an advisory body. An appointed public official serving on the board that made the decision subject to the appeal, an appointed public official serving on a board that is directly affected by the decision and the City Council members are exempted from the fee requirement. Directors Application An application that receives final approval by staff either via an advertised public hearing or non- hearing format. The application may involve a pre-application meeting and/or Environmental Review committee review, Temporary Sign Permit A staff review of a temporary sign application that includes an evaluation of the sign request, the entry into the temporary log and site review by Code Enforcement Officers. The permit fee is in addition to the submittal of a deposit to guarantee removal of the sign upon expiration of the temporary permit. Tentative Map Five or more parcels, Parcel Map Four or less parcels. Housing Mitigation Fee Fee collected is used to construct new affordable residential units for Cupertino residents and employees. The fees mitigate the need for affordable units caused by expanding offices creating new jobs and new residential development, office, R&D, industrial and residential development. NOTES: Mixed use applications will be classified based upon the highest intensity and review process. The Director of Community Development will have discretion to classify projects based upon the above criteria, CITY OF CUPERTINO Resolution 04-2911AprilI9, 2004 Fees Effective July 1, 2004 Schedule C - Planning General Plan Amendment Authorization - Major $3,590.00 General Plan Amendment Authorization - Minor $1,795.00 Study Session $3,590.00 General Plan Amendment - Major $11,185.00 General Plan Amendment - Minor $5,593.00 Development Agreement $14,789.00 Zoning-Minor $2,770.00 Zoning < one acre $5,539.00 Zoning one to five acres $8,420.00 Zoning> five acres $11,473.00 Tentative Map $12,206.00 Use Permit - Major $12,206,00 Exception (per exception) $2,150,00 Amendment to Development Approval $3,260,00 Hillside Exeption $5,407.00 Parcel Map $5,701.00 Use Permit - Minor $5,701.00 Planning Commission - Architectural and Site Approval $5,701.00 Planning Commission Interpretation $2,849.00 Planning Commission - Tree Removal $2,462.00 Environmental Impact Report $21,353,00 Negative Declaration - Major $3,285,00 Negative Declaration - Minor $1,643.00 Categorical Exemption $191.00 CITY OF CUPERTINO Resolution 04-2911April19, 2004 Fees Effective July 1, 2004 Schedule C - Plauuiug (Continued) Design Review Committee - Architectural and Site Approval $2,757.00 R-l Design Review $1,915,00 R-l Exception $1,339.00 Sign Exception $1,612,00 Fence Exception $549.00 Director - Variance $1.377.00 Director - Minor Modification $963.00 Director - Tree Removal $795.00 Temporary Use Permit $1,100.00 $161.00 Temporary Sign Permit Sign Program $551.00 Appeal $145.00 Zoning, Planning, Municipal Code (Building Permit Fees) Commercial/Multi-Family Residential Single Family $O.21/sq, ft. $O,111sq, ft. Wireless Master Plan Fee: Equipment Mount on Existing Light Standard or Utility Pole $5,OO/mount Wireless Master Plan Fee: Other Personal Wireless Facility $1,000.00/facility Housing Mitigation In-Lieu Fees Residential Office/lndustrial/R&D $1.l5/sq. ft. $2.25/sq, ft. Stevens Creek Blvd. Specific Plan Fee $.044/sq, ft. CITY OF CUPERTINO Resolution 04-29I/April19, 2004 Fees Effective July I, 2004 Schedule D - Building Valuation Schedule OCCUPANCY AND TYPE 1. APARTMENT HOUSES *Type I or II F.R. Type V - Masonry or Type III Type V - Wood Frame Type I - Basement Garage REMODEL COST PER SQ. FT. COST PER NEW SQ. FT. $42,94 $35.41 $32.74 $20.77 $136.81 $111.13 $102.73 $ 46,85 2. AUDITORIUMS Type 1 or 11 F.R. Typell-I-Hour Type II - N Type II1-1-Hour Type 111 - N Type V - I-Hour Type V - N 5. CHURCHES Type I or 11 F,R, Type 11 -I-Hour Type II - N Typelll-I-Hour Type III - N Type V - I-Hour $44,65 $131.29 $32,74 $ 95,09 $32,70 $ 89,95 $32,74 $ 99,97 $32.74 $ 94,84 $32.74 $ 95.58 $32.47 $ 89.20 $56.70 $185.54 $56.52 $136.68 $56.42 $132.29 $57.87 $150.84 $57.81 $145.45 $45.96 $136.68 $45.90 $130.92 $27.37 $ 63.90 $27.37 $ 59.63 $27.39 $ 69.53 $27.37 $ 65.02 $27.34 $ 46.85 $40.28 $124,28 $32.71 $ 93.34 $32.70 $ 88,69 $32.74 $101.48 $32.74 $ 96.97 $32.74 $ 89.20 3. BANKS *Type 1 or II F.R. Type I1-1-Hour Type 11 - N Type Ill-I-Hour Type III - N Type V - I-Hour TypeV-N 4. BOWLING ALLEYS Type II - I-Hour Type 11 - N Type Ill-I-Hour Type 111 - N Type V - I-I Hour * Add 0.5 percent to total cost for each story over three **Deduct 11 percent for mini-warehouses ***Deduct 20 percent for "shell only" buildings CITY OF CUPERTINO Resolution 04-291/AprilI9, 2004 Fees Effective July 1,2004 Schedule D - Buildiug Valuatiou Schedule OCCUPANCY AND TYPE SQ. FT. 6. CONVALESCENT HOSPITALS 'Type I or 11 F.R. Type 11 I-Hour Type II1-1-Hour Type V - I-Hour REMODEL COST PER SQ. FT. COST PER NEW 10. HOSPITALS 'Type 1 or 11 F.R. Typelll-l-Hour Type V - I-Hour $58.00 $174.39 $41.99 $121.02 $41.99 $124.03 $41.95 $116,88 $39.31 $121.40 $39.31 $115.76 $16.93 $ 29.07 $16.93 $ 22.18 $45,88 $143.32 $35,03 $ 94.33 $35.00 $ 88,95 $35.03 $103.23 $35.03 $ 98.85 $35,08 $ 96.84 $35.00 $ 91.83 $43.32 $129.92 $35.03 $105.49 $35,03 $100,97 $35.08 $109,87 $35.08 $105.36 $35.05 $106,11 $35.03 $102.47 $67.39 $204.46 $56.67 $169,25 $52.66 $161.49 7. DWELLINGS Type V - Masonry Type V - Wood Frame Basements Semi-Finished Unfinished 8. FIRE STATIONS Type I or 11 F.R. Type 11 - I-Hour Type 11 - N Type II1-1-Hour Type III - N Type V - I-Hour Type V - N 9. HOMES FOR THE ELDERLY Type I or 11 F.R. Type 11-l-Hour Type 11 - N Type lll-l-Hour Type 111 - N Type V - I-Hour Type V - N 'Add 0.5 percent to total cost for each story over three "Deduct 11 percent for mini-warehouse "'Deduct 20 percent for "shell only" buildings "" Add 25% for hazardous occupancy or high tech CITV 011 CUPEnTINO Resolution 04-29I/April19, 2004 Fees Effective July I, 2004 Schedule D - Buildlug Valuatlou Schedule OCCUPANCY AND TYPE SQ. FT. REMODEL COST PER SQ. FT. COST PER NEW 11. HOTELS AND MOTELS 'Type I or II F.R. Type Ill-I-Hour Type III - N Type V - I-Hour TypeV-N $43,19 $40,57 $34.06 $34,09 $34.06 $126.54 $109.62 $104.48 $ 95.47 $ 98.67 12. INDUSTRIAL PLANTS **** Type 1 or 11 F.R. Type II -l-Hour Type II - (Stock) Type III - I-Hour Type III - N Tilt-Up Type V - I-Hour Type V - N $26.14 $26.09 $26.09 $26.11 $26.11 $26,11 $26,11 $26,09 $ 71.28 $ 49.61 $ 45.60 $ 54.62 $ 51.49 $ 40.83 $ 51.49 $ 47.10 13. JAILS Type I or 11 F.R. Type III - I-Hour Type V - I-Hour $66.05 $62.13 $49.92 $199.32 $182,29 $136.68 14. LIBRARIES Type 1 or 11 F.R, Type l1-I-Hour Type 11 - N Typell1-1-I-Hour Type 111 - N Type V - I-Hour Type V - N $48,60 $34.06 $34,06 $33,87 $34.09 $34.09 $34.06 $145.83 $106.74 $101.48 $112.76 $107.09 $105.87 $107.02 15. MEDICAL OFFICES **** Type 1 or II F.R. Type I1-1-Hour Type 11 - N Type Ill-I-Hour Type III - N Type V - I-Hour Type V - N $57.86 $43.27 $43.27 $43.32 $43.32 $43.27 $43.27 $149.71 $115.51 $109.74 $125.28 $116.63 $113.00 $109.00 'Add 0.5 percent to total cost for each story over three "Deduct 11 percent for mini-warehouse "'Deduct 20 percent for "shell only" buildings ,." Add 25% for hazardous or high tech occupancies CITY OF CUPERTINO Resolution 04-29I1April19, 2004 Fees Effective July 1, 2004 Schedule D - Building Valuation Schedule OCCUPANCY AND TYPE SQ. FT. REMODEL COST PER SQ. FT. COST PER NEW 16. OFFICES Type I or II F,R. Type I1-1-Hour Type 11 - N Type Ill-I-Hour Type 111 - N Type V - I-Hour TypeV-N $52.57 $35.32 $35.32 $35.35 $35.41 $35.32 $35.32 $133.25 $ 89.58 $ 85,31 $ 96,72 $ 92.45 $ 90.57 $ 85.31 17. PRIVATE GARAGES Wood Frame Masonry Open carports/covered decks/porches Uncovered decks $16.92 $16.92 $11.68 $11.47 $ 30.44 $ 34.33 $ 20.79 $ 17.48 18. PUBLIC BUILDINGS Type 1 or 11 F.R. Type 11-1-Hour Type 11 - N Type 111-I-Hour Type III - N Type V - I-Hour TypeV-N $60.45 $45.90 $45.85 $45.95 $45,90 $45.85 $45.85 $160.00 $125.28 $119.77 $130,04 $125,53 $119.02 $114.75 19. PUBLIC GARAGES Type I or II F.R. Type 1 or 11 Open Parking Typell-N Type III-1-Hour Type III - N Type V -l-Hour $26.14 $26,06 $26,09 $26,09 $26.09 $26.09 $ 61.26 $ 45.98 $ 35.08 $ 46.36 $ 41.22 $ 42.22 20. RESTAURANTS 'Type I11-1-Hour Type 111 - N Type V - I-Hour Type V - N $65.60 $65.60 $59,06 $56,22 $122,02 $117.89 $111.75 $107.37 'Add 0.5 percent to total cost for each story over three "Deduct II percent for mini-warehouse "'Deduct 20 percent for "shell only" buildings "" Add 25% for hazardous or high tech occupancies OCCUPANCY AND TYPE SQ. FT. 21. SCHOOLS Type 1 or II F,R, Type 11 - I-Hour Type III - I-Hour Type 111 - N Type V - I-Hour Type V - N 22. SERVICE STATIONS Type 11 - N Type Ill-I-Hour Type V - I-Hour Canopies 23. STORES *Type I or II F.R. Type II -l-Hour Type 11 - N Type Ill-I-Hour Type 111 - N Type V - 1 Hour Type V - N 24. THEATERS Type 1 or 11 F,R, Type II1-1-Hour Type 111 - N Type V - I-Hour TypeV-N 25. W AREHOUSES** Type I or 11 F.R. Type 11 or V-I-Hour Type II orV-N Type II1-1-Hour Type III - N CITY OF CUPERTINO Resolution 04-2911April19, 2004 Fees Effective July 1, 2004 Schedule D - Building Valuation Schedule REMODEL COST PER SQ. FT. * Add 0,5 percent to total cost for each story over three **Deduct 11 percent for mini-warehouse ***Deduct 20 percent for "shell only" buildings **** Add 25% for hazardous or high tech occupancies $65,74 $48.43 $48.43 $45.80 $45.80 $45.74 $45,15 $45.16 $45,09 $45.00 $40,58 $36,56 $36,61 $36.65 $36.61 $36.57 $36.56 $52,57 $37,94 $36.74 $35.32 $34.00 $36.56 $18.26 $18.26 $18.26 $18.25 COST PER NEW $139.31 $ 95.09 $101.73 $ 97.84 $ 97,84 $ 90,95 $ 84.19 $ 87.82 $ 74.79 $ 35.08 $103,23 $ 63.14 $ 61.76 $ 76.79 $ 72.04 $ 64.64 $ 59.76 $137.55 $100.23 $ 95.47 $ 94.33 $ 89.20 $ 61.89 $ 36.70 $ 34.46 $ 41.59 $ 39.59 Commercial Residential Sprinkler Systems CITY OF CUPERTINO Resolution 04-2911April19, 2004 Fees Effective July 1, 2004 Schedule D - Buildiug Valuation Schedule EQUIPMENT AND AIR CONDITIONING $ $ $ 5.26 4.39 3.25 RETAINING WALLS, PER SQ. FT. (HEIGHT X LENGTH) AREA ABOVE GRADE Masonry Concrete $ 30,07 $ 26.46 .............................................................................., Address Changes $268.92 CITY OF CUPERTINO Resolution 04-2911AprilI9, 2004 Fees Effective July I, 2004 Schedule D - Buildiug Permit Permit Valuation $1 - $3,000 $83.16 $3,001 - 25,000 $93.96 for the first $3,000 plus $10.80 for each additional $1,000 or traction thereof, to and including $25,000, $25,001 - 50,000 $324.00 for the first $25,000 plus $8.64 for each additional $1,000 or fraction thereof, to and including $50,000, $50,001 - 100,000 $540,00 for the first $50,000 plus $6.48 for each additional $1,000 or traction thereof, to and including $100,000. $100,001 - 500,000 $851.04 for the first $100,000 plus $4.32 for each additional $1,000 or traction thereof, to and including $500,000. $500,001 - 1,000,000 $2,817.72 for the first $500,000 plus $3,24 for each additional $1,000 or fraction thereof, to and including $1,000,000. $1,000,001 - $4,795.20 for the first $1,000,000 and up plus $2.16 for each additional $1,000 or traction thereof. PLAN CHECKING Structural and Non-Structural 1.3345% of building permit fee for each plan submitted. Each additional identical repeat plan for multi-unit residential developments will be assessed at $34.86 each unit. Energy 48% of building permit fee for each plan submitted, Each additional identical repeat plan for multi-unit residential developments will be assessed at $34.86 each unit. Repeat plan checks that exceed 2 reviews will be charged an hourly rate at $87,14 per hour. CITY OF CUPERTINO Resolution 04-291/AprilI9, 2004 Fees Effective July I, 2004 Schedule D - Building - Electrical Fees New Residential Buildings and Remodels that add additional square footage The following fees shall include all wiring and electrical equipment in or on each building, or other electrical equipment on the same premises constructed at the same time. Permit Fee $38.37 New multi-family residential buildings (apartments and condominiums) having three or more living units not including the area of garages, carports and other non-commercial automobile storage areas constructed at the same time, per square foot $.07 New single and two-familv residential buildings not including the area of garages, carports and other minor accessory buildings constructed at the same time, per square foot $.08 For other types of residential occupancies and alterations, additions and modifications to existing residential buildings, use the UNIT FEE SCHEDULE New commercial buildings and completely remodeled spaces not including the Area of garages, per square foot $.13 Commercia] alterations and modifications to existing buildings, use the Unit fee schedule CITV 011 CUPERTINO Resolution 04-2911AprilI9, 2004 Fees Effective July 1, 2004 Schedule D - Building - Electrical UNIT FEE SCHEDULE Remodel- No additional square footage Permit Fee Residential Appliances For fixed residential appliances or receptacle outlets for same, including wall-mounted electric ovens; counter mounted cooking tops; electric ranges, self-contained room console, or through-wall air conditioners; space heaters; food waste grinders; dishwashers washing machines; water heaters; clothes dryers; or other motor operated appliances not exceeding one horsepower (HP) in rating each NOTE: For other types of air conditioners and other motor-driven appliances having larger electrical ratings, see Power Apparatus, Non-Residential Appliances For residential appliances and self-contained factory-wired, non-residential appliances non exceeding one horsepower (HP), kilowatt (KW), or kilovotampere (KV A) in rating including medical and dental devices; food, beverage, and ice cream cabinets; illuminated show cases; drinking fountains; vending machines; laundry machines; or other similar types of equipment, each NOTE: For other types of air conditioners and other motor-driven appliances having larger electrical ratings, see Power Apparatus. Services For services of 600 volts or less and not over 200 amperes in rating, each For services of600 volts or less and over 200 amperes to 1,000 amperes in rating, each For services over 600 volts over 1,000 amperes in rating, each $ 38.37 $ 4,80 $ 4.80 $ 29.43 $ 59.94 $119,88 CITY OF CUPERTINO Resolution 04-2911April19, 2004 Fees Effective July 1, 2004 Schedule D - Building - Electrical USER FEE SCHEDULE (continued) Remodel - No additional square footage Signs, Outline Lighting and Marquees For signs, outline lighting systems or marquees supplied from one branch circuit, each For additional branch circuits within the same sign, outline lighting system or marquee, each Miscellaneous Apparatus, Conduits, Conductors, and Special Circuits For electrical apparatus, conduits and conductors for which a pennit is required but for which no fee is herein set forth Power Device/Apparatus For motors, generators, transfonners, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment and other apparatuses, as follows: Rating in horsepower (RP), kilowatts (KW), kilovolt-amperes (KV A), or kilovolt-amperes-reactive (KV AR): I unit 2 through 5 units, each additional 6 and over, each additional NOTE: I, For equipment or appliances having more than one motor, transfonner, heater, etc., the sum of the combined ratings may be used, 2. These fees include all switches, circuit breakers, contractors, thennostats, relays and other directly related control equipment. $23.98 $ 4.80 $27.58 $47.96 $17.99 $11.99 CITY OF CUPERTINO Resolution 04-2911April19, 2004 Fees Effective July 1, 2004 Schedule D - Buildiug - Electrical UNIT FEE SCHEDULE (continued) Remodel - No additioual square footage Busways For trolley and plug-in-type busways, each 100 feet or fj-action thereof $7.02 Note: An additional fee will be required for lighting fixtures, motors and other appliances that are connected to trolley and plug-in-type busways. No fee is required for portable tools, Receptacle, Switch and Lighting Outlets For receptacle, switch, lighting or other outlets at which current is used or controlled, except services, feeders and meters, First 20 each Additional outlets, each NOTE: For multi-outlet assemblies, each 5 feet or fj-action thereof may be considered as one outlet. $1.20 $0,73 Lighting Fixtures For lighting fixtures, sockets or other lamp holding devices First 20 each Additional fixtures, each $1.20 $0.73 For pole or platform-mounted lighting fixtures each For theatrical-type lighting fixtures or assemblies each $1.20 $1.20 CITY OF CUPERTINO Resolution 04-291/April 19, 2004 Fees Effective July 1,2004 Schedule D - Building - Mechanical Fees New Residential Buildings and Remodels that add additional sqnare footage. The following fees shall include all mechanical equipment in or on each building, or other mechanical equipment on the same premised constructed at the same time. New multi-family residential buildings (apartments and condominiums) having three or more living units not including the area of garages, carports and other non-commercial automobile storage areas constructed at the same time, per square foot $0,07 New and single and two-familv residential buildings not including the area of garages, carports and other minor accessory buildings constructed at the same time, per square foot $0.08 For other types of residential occupancies and alterations and modifications To existing building, use the unit fee schedule New commercial buildings and completelv remodeled spaces not including The area of garages, per square foot $0.13 Commercial alterations and modifications to existing buildings, use the unit Fee schedule ('ITV 01' ('UPRRTINO Resolution 04-2911April19, 2004 Fees Effective July 1, 2004 Schedule D - Buildlug - Mechanical Fees UNIT FEE SCHEDULE Remodels - No additional Square Footage Permit Fee For the repair of alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, V A V boxes, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this Code. For each air-handling unit, AlC units, heat pumps to and including 10,000 cubic feet per minute, including ducts attached thereto. Does not apply to central type. NOTE: This fee shall not apply to an air-handling unit that is a portion of a factory-assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this Code, For each air-handling unit AlC unit, heat pump over 10,000 cfm For the installation or relocation of each commercial or industrial-type Hood For the installation of each residential hood that is served by a mechanical exhaust, including the ducts for such hood For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu!h For each ventilation system which is not a portion of any heating or air conditioning system authorized by a permit For each ventilation fan connected to a single duct For the installation or relocation of each forced air or gravity type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h $ 38.37 $ 13.19 $ 10,26 $ 17.82 $137.87 $ 10.26 $ 14.31 $ 10.26 $ 7.02 $ 17.55 CITY OF CUPERTINO Resolution 04-2911April19, 2004 Fees Effective July 1,2004 Schedule D - Building - Mechanical Fees UNIT FEE SCHEDULE (continued) Remodels - No additional Square Footage For the installation or relocation of each floor fumace, including vent $ 14.31 For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater $ 14.31 For the installation, relocation or replacement of each appliance vent installed and not included in an appliance pennit $ 7.02 For the installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btulh (29.3 kw) $ 14.31 For the installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu/h and including 500,000 Btu!h $ 26,19 For the installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu/h to and including 1,000,000 Btu/h $ 35,91 For the installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu/h to and including 1,750,000 Btu!h $ 53.46 For the installation or relocation of each boiler or reffigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu/h $89.37 For each appliance or piece of equipment regulated by this Code but not classed in other appliance categories, or for which no other fee is listed in this Code $ 10.26 CITY OF CUPERTINO Resolution 04-2911April19, 2004 Fees Effective July 1, 2004 Schedule D - Building - Plumbing Fees New Residential Buildings and Remodels that add additional square footage The fo1lowing fees sha1l include a1l plumbing equipment in or on each building, or other plumbing equipment on the same premises constructed at the same time, New multi-family residential buildings (apartments and condominiums) having three or more living units not including the area of garages, carports and other non-commercial automobile storage areas constructed at the same, per square foot $0.07 New single and two-family residential buildings not including the area of garages, carports and other minor accessory buildings constructed at the same time, per square foot $0.08 For other types of residential occupancies and alterations and modifications To existing building, use the unit fee schedule New commercial buildings and completely remodeled spaces not including The area of garages, per square foot $0.13 Commercial alterations and modifications to existing buildings, use the unit fee schedule CITY 011 CUPRRTINO Resolution 04-2911AprilI9, 2004 Fees Effective July 1, 2004 Schedule D - Building - Plumbing Fees UNIT FEE SCHEDULE Remodel- No additional Square Footage Permit Fee $38.37 For installation, alteration or repair of water piping water treating equipment $ 9.00 For repair or alteration of drainage or vent piping, floor, area, condensate piping $ 9.00 For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping and backflow protection therefor) $ 9.00 For each gas piping system of one (1) to four (4) outlets $ 5.40 For each gas piping system of five (5) or more, per outlet $ 1.20 For each industrial waste pre-treatment interceptor, including its trap and vent, excepting kitchen type grease traps functioning as fixture traps $17,99 Kitchen type trap and/or system $ 9.00 $21.58 For each building sewer, sanitary sewer, and each trailer park sewer Storm/rainwater systems per drain $ 9.00 For each water heater and/or vent Water service $10.79 $ 9.00 Re-pipe per fixture $ 9,00 CITY OF CUPERTINO Resolution 04-2911April19, 2004 Fees Effective July 1, 2004 Schedule D - Buildiug - Plumbiug Fees UNITS FEE SCHEDULE Remodel- No additional Square Footage (continued) For each lawn sprinkler system on anyone meter, including backflow protection devices therefor $13.19 Five (5) or more, each $ 1.08 For atmospheric type vacuum breakerslbacld1ow not included in item I 1 to 5 over 5 each additional $10.79 $ 2.16 $67.14 For each private sewage disposal system For each cesspool $33.57 CITY OF CUPERTINO Resolution 04-2911April 19, 2004 Fees Effective July 1, 2004 Schedule D OTHER BUILDING INSPECTION FEES Private Swimming Pools For new private, residential, in-ground, swimming pools for single-family and multi-family occupancies including a complete system of necessary branch circuit wiring, bonding, grounding, underwater lighting, water pumping and other similar electrical equipment directly related to the operation of a swimming pool, each including plan check and energy. $540.00 For other types of swimming pools, therapeutic whirlpools, spas and alterations to existing swimming pools, use the UNIT FEE SCHEDULE Temporary Power Service For a temporary service power pole or pedestal including all pole or pedestal-mounted receptacle outlets and appurtenances, each. $62.10 For a temporary distribution system and temporary lighting and receptacle outlets for construction sites, decorative light, Christmas tree sales lots, fireworks stands, etc, each. $11.88 Inspection outside of the normal business hours (minimum charge two hours) $90.72/hr, Inspection for which no fee is specifically established (minimum charge one hour) $68.04/hr, Re-inspection - A fee may be assessed for each inspection or re-inspection when such portion of work for which inspection is called is not complete or when corrections called for are not made. $176,18 CITV OF CUPERTINO Resolution 04-2911April19, 2004 Fees Effective July 1, 2004 Schedule E - Recreation Recreation classes and excursion fees shall be detennined as follows: Classes I, Detennine the maximum hourly rate paid to instructor. 2. Multiply the instructor's hourly rate by the number of class meetings, 3. Detennine the minimum number of participants and divide into the instructor's cost. 4, Add indirect overhead percent - 32%. 5, Add 20% to establish non-resident fee. 6, Add cost for specialized equipment or supplies. Special conditions: For classes taught by contract instructors, the indirect overhead is only added to the City's percentage. Excursions I. Transportation cost divided by the number of participants plus overhead transfer, 2. Add 20% to establish non-resident fee. 3. Add any admission cost, supplies or leadership cost. Additional factors that mav be used to detennine the class or excursion user fee: The total number of participants in a given activity may generate additional revenue whereby the total program cost may be reduced, Classes that traditionally have waiting lists may have the user fee increased. Programs in competition with adjacent cities or the private sector may require fees to be increased or decreased to remain competitive, CITY 011 CUPRRTINO Resolution 04-2911April19, 2004 Fees Effective July 1, 2004 Schedule E - Recreation Facility Use Fee Schedule (Staff Use Only) CLASSIFICATIONS: Priority of Use Group I: Group II: Group III: Group IV: Group V: Group VI: City of Cupertino activities that are open to the public. Official city sponsored programs, Clubs with 51 % resident membership, recreation programs and events with full or affiliated city co-sponsorship and open to the public. Programs and events sponsored by Cupertino based non-profit recreation, education or community service organization with 51 % resident participation. These organizations must show an official structure and status. Private, special interest or business groups for functions not open to the public, These functions would include parties, banquets, receptions, industrial conferences, seminars, trade shows, etc. Programs and events sponsored by non-resident non-profit recreation, education or community service organization. These organizations must show official structure and status. Cupertino Businesses using the Cupertino Room of the Quinlan Community Center for promotional and business related purposes other than negotiation or direct sale. CITY OF CUPERTINO Resolution 04-29I1April19, 2004 Fees Effective July 1, 2004 Schedule E - Recreation Quinlan Community Ceuter ROOM RENTAL SCHEDULE PER HOUR Cupertino Room Mondav - Thursday Fridav - Sundav Group II N/A $17 Group III $30 $80 Group IV $140 $230 Group V $50 $140 Group VI $265 $265 Classroom Group II N/A $12 Group III $20 $60 Group IV $45 $90 Group V $25 $75 Conference Room Group II N/A $12 Group III $10 $25 Group IV $40 $60 Group V $25 $50 Security Staff Security staff is required when alcohol is served at any City facility: $25.00 per hour. Overtime Fee Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first half hour, and $150,00 for every half hour thereafter. This charge will be deducted from the security deposit. This applies to all City facilities. Security Deposit A security deposit shall be required for Groups III, IV, V, and VI. Security deposit is due at time of reservation. The Department Director may also require a deposit based on the nature of an event. The security deposit will be refunded ifno damage occurs, rooms are left in clean condition, and permits conclude on time. Quinlan Community Center Cupertino Room - Groups IV, VI All Other Rooms - Group IV Group II, II, V - All Rooms $750 $300 $300 CITY OF CUPERTINO Resolution 04-29I/April19, 2004 Fees Effective July 1, 2004 Schedule E - Recreatiou Monta Vista Recreation Center Creekside Park Building Room Rental Schedule Per Hour Monta Vista Recreation Center Creekside Park Building Multi-Purpose Group III Group IV Group V N/A N/A N/A N/A N/A N/A Classroom Group II Group III Group IV Group V $15 $15 $30 $20 $15 $15 $30 $20 Conference RoomlKitchen Group II Group III Group IV Group V $15 $15 $25 $20 N/A N/A N/A N/A Security Staff Security staff is required when alcohol is served at any City facility: $25.00 per hour. Overtime Fee Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first half hour, and $150.00 for every half hour thereafter, This charge will be deducted ITom the security deposit. This applies to all City facilities. Securitv Deposit A security deposit shall be required for Groups III, IV, V, and VI. Security deposit is due at time of reservation. The Department Director may also require a deposit based on the nature of an event. The security deposit will be refunded ifno damage occurs, rooms are left in clean condition, and permits conclude on time. CITY OF CUPERTINO Resolution 04-2911AprilI9, 2004 Fees Effective Jnly I, 2004 Schedule E - Recreation Senior Center Room Rental Schedule Per Hour Reception Room Evenings and Weekends' Group II Group III Group IV Group V $12 $80 $230 $140 Classroom, Conference Room, Arts & Crafts Room, Bay Room Group II Group III Group IV Group V $12 $60 $90 $75 'Senior Center rooms are not available for rental Monday through Thursday 8:00 a.m, to 10:00 p.m. and Friday, 8:00 a.m. to 5:00 p,m, Security Staff Security staff is required when alcohol is served at any City facility: $25.00 per hour, Overtime Fee Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first half hour, and $150,00 for every half hour thereafter, This charge will be deducted trom the security deposit. This applies to all City facilities. Security Deposit A security deposit shall be required for Groups III, IV, V, and VI. Security deposit is due at time of reservation. The Department Director may also require a deposit based on the nature of an event. The security deposit will be refunded ifno damage occurs, rooms are left in clean condition, and permits conclude on time. Cupertino Senior Center Reception Hall - Group IV All Other Rooms - Group IV Group II, III, V ~ All Rooms $750 $300 $300 CITY OF CUPERTINO Resolution 04-2911AprilI9, 2004 Fees Effective July I, 2004 Schedule E - Recreatiou OUTDOOR FACILITIES Memorial Softball Field Cupertino residents/businesses only Non-Residents Field can be reserved for a maximum of2 hours THERE IS NO FEE FOR CURRENT SOFTBALL TEAMS PLAYING IN CUPERTINO LEAGUES Field preparation (includes dragging, watering, chalking, and bases) Field Attendant (2 hour minimum) Field Attendant is required any time lights or field preparation is requested. Lights (in the evening) Memorial Park Amphitheater Cupertino residentJResident business Non-residentINon-resident business Memorial Park Gazebo Cupertino residentJResident business Non-residentINon-resident business Picnic Areas (Daily Rate) Cupertino residents Cupertino business Non-residents Non-resident business Electricity at Memorial or Linda Vista Park Sports Field Fees Adult Leagues (two hour minimum) Deposit Youth Leagues $25.00 $40.00 $36.50 $ 8.25/hr, $ 5.00/hr. $55.00 $75.00 $55.00 $75.00 $ 55.00 $ 75.00 $ 80.00 $100.00 $ 25,00 $50.00/hr $600.00 $11.00/ Participant/Season CITV OJ? CUPRRTINO Resolution 04-291 April 19, 2004 Fees Effective July 1, 2004 Schedule E - Recreation BLACKBERRY FARM PICNIC GROUNDS General Admission: ADULT (13 years and over) CHILD (6 through 12) Group Rates: Weekends & Holidavs Resident $8.00 Non-Resident $9.00 $5.00 $6.00 Weekends & Holidavs Adult (13 & Older) 100-500 persons $8.50 501-1,000 $8,00 1,001 or more $7.50 Full Summer Pass Available any day the park is open: Adult (13 & Up) Child (6 to 12 years old) Family Pass (2 people) Family Pass (3 people) Family Pass (4 people) Family Pass (5 people) Family Pass (6 people) Child (6-12) $6.50 $6.00 $5.50 Resident $85.00 $60,00 $140.00 $150.00 $160.00 $170.00 $180.00 Weekdavs Resident $5.00 Non-Resident $6.00 $4,00 $5.00 Weekdays Adult Child (13 & Older) (6-12) $5.75 $4.75 $5.50 $4.50 $5.25 $4.25 Non-Resident $110.00 $70,00 $170.00 $180.00 $190,00 $200.00 $210.00 CITY OF CUPERTINO Resolution 04-2911AprilI9, 2004 Fees Effective July 1, 2004 Schedule E - Recreatiou to-Day Pass Available any 10 days the park is open: Resident Adult (13 and older) $40,00 Child (6 to 12 years old) $32.50 Children under 6 are free when accompanied by their parents BLACKBERRY FARM GOLF COURSE Weekends Resident Non-Resident 9-Holes $13,00 $15.00 Junior & Senior N/A N/A Second 9 Holes (all $11.00 $13,00 players) Non-Resident $45.00 $36.00 Weekdavs Resident Non-Resident $11.00 $13,00 $10.00 $12.00 $10.00 $12,00 All groups and toumaments pay the full rate (Cupertino resident still applies). Staff is authorized to set merchandise fees according to current cost. BLACKBERRY FARM RETREAT CENTER Conference Room (9:00 a.m. to 5:00 p,m., with meals) $69.95/person CITY OF CUPERTINO Resolution 04-291/April19, 2004 Fees Effective July 1, 2004 Schedule E - Recreation BLACKBERRY FARM GOLF COURSE Annual Rate (Weekdays Only) Semi-Annual Rate (Weekdays Only) Adults (17-61) JrlSr $850 $775 $1,000 $925 $455 $415 $540 $495 Cupertino Residents Non-Residents Cupertino Residents Non-Residents Snper-Annual Rates (Good on Weekends & Holidays) Cupertino Residents Non-Residents $1,000 $1,125 $1,000 $1,125 Super-Semi Annual Rates (Good on Weekends & Holidays) Cupertino Residents Non-Residents $500 $600 $500 $600 Quick Passes (Ten-play card for the price of nine) Cupertino Resident Weekday Cupertino Resident Weekend Green Fees $99 $90 $117 $117 $126 $108 $135 $135 $11 $10 $13 $13 $13 $12 $15 $15 Non-Resident Weekday Non-Resident Weekend Cupertino Resident Weekday Cupertino Resident Weekend Non-Resident Weekday Non-Resident Weekend CITY OF CUPERTINO Resolution 04-2911AprilI9, 2004 Fees Effective July 1,2004 Schedule E - Recreatiou CUPERTINO SPORTS CENTER Day Passes ~ Resident Non-Resident $7,00 $10.00 Monthly Passes One Month Single $55.00 $65.00 One Month Couple $75.00 $90.00 One Month Family $95.00 $115.00 Annual Passes One Year Single $395.00 $425,00 One Year Couple $780.00 $850.00 One Year Family $875.00 $950.00 One Year Senior $350.00 $375.00 ADDITIONAL CONDITIONS I. Annual fee for Juniors (17 years and younger) of$270.00 Resident, $300.00 Non-Resident. 2. Annual fee for seniors (62 years and older) of$350.00 Resident, $375.00 Non-Resident 3. The Cupertino Tennis Club will be charged $lO,OO/hour during primetime and $6.00/hour per court during non-primetime for all c.T.C. sponsored activities other than U.S.T.A. leagues and practices. 4. All competitors in c.T.c./U.S.T.A. leagues participating at the Sports Center must purchase an annual pass, 5. Individuals may purchase a ten pack of day passes, $60.00 Resident, $90,00 Non-Resident. 6. Specials will be offered on an on-going basis. CUPERTINO TEEN CENTER Rental Rate Deposit $150.00 $750.00 Overtime Rate $200,00 first hour $100,00 each half hour after Non-Resident Rate: Daily use fee Monthly pass Annual pass $3.00 $20.00/month $200.00/yr, Child Watch Fees One visit: Ten visits: One Month Pass: $5.00 $45.00 $$100.00 CITY OF CUPERTINO Resolution 04-29I1April19, 2004 Fees Effective July I, 2004 Schedule E - Recreation Community Hall ROOM RENTAL SCHEDULE PER HOUR Group II Group III Group IV Group V Group VI Mondav - Thursday $40 $40 $150 $60 $275 Fridav - Sundav $90 $90 $240 $150 $275 Security Staff Security staff is required when alcohol is served at any City facility: $25.00 per hour. Overtime Fee Functions exceeding the pennitted reservation time shall be charged $150,00 for any time up to the first half hour, and $150.00 for every half hour thereafter, This charge will be deducted from the security deposit. This applies to all City facilities, Security Deposit A security deposit shall be required for Groups III, IV, V, and VI. Security deposit is due at time of reservation, The Department Director may also require a deposit based on the nature of an event. The security deposit will be refunded if no damage occurs, rooms are left in clean condition, and pennits conclude on time, Community Hall Groups IV, VI Groups II, III, V $750 $300