CC Resolution No. 04-291
RESOLUTION NO: 04-291
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
RESCINDING RESOLUTION NO. 03-069 AND EST ABLlSHING USER FEES
WHEREAS, the State of California requires fees charged for service rendered not to exceed
the cost of delivering said services; and
WHEREAS, a public hearing has been held to review user fees; and
WHEREAS, the City Council of the City of Cupertino has established guidelines for setting
user fees;
NOW, THEREFORE, BE IT RESOLVED that:
I. User fees are established per attachments A through E.
2, All user fees previously established by Council action or resolution are hereby
superseded.
3. User fees are effective July 1,2004,
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino
this 19th day of April 2004 by the following vote:
Vote
Members of the City Council
AYES:
NOES:
ABSENT:
ABSTAIN:
James, Kwok, Wang
Sandoval
Lowenthal
None
ATTEST:
APPROVED:
. ~
C~
~c:L'A
ayor, City ofCu#tino
Department
General
Engineering
Planning
Building
Recreation
CITY OF CUPERTINO
SUMMARy OF USER FEES
Resolution 04-291/April19, 2004
Fees Effective July 1, 2004
Schedule
A
B
C
D
E
CITY OF CUPERTINO
Resolution 04-29I/April19, 2004
Fees Effective July 1, 2004
Schedule A - Geueral
Photocopies - per sheet
Microfilm/Microfiche Printout
Budget Documents
Comprehensive Annual Financial Reports (CAFR)
Returned Check Charge
Late Payment on 30 Day Delinquent City Invoices
Property Liens Administrative Fee
Municipal Code Book
Williamson Act Filings
Tape Dubbing - Audio, Video, DVD, CD
VHS
DVD
CD WebcastlCD Audio
DV CAM/BETA CAM
V-Matic
MiniDV
Audio Cassette
Notary Fee
Fingerprinting Processing
Handbill Pennit
Renewals
Solicitor Pennit (Includes fingerprinting)
Renewals
Massage Establishment Fee (Includes fingerprinting
and background check)
Renewals
Massage Therapist Fee (Includes fingerprinting and
background check)
Renewals
$0.20
$0.50/frame
$50,00
$30.00
$25.00
12% per annum
$30 per book/block/parcellien
$77.00
$105,00
$12.00/tape
$20.00/DVD
$12,OO/CD
$50.00/tape
$25.00/tape
$30.00/DV
$1.00/tape
$lO.OO/signature
State Fee $32,00 Plus
$12.00 City Administrative Fee
$93,00
$26.00
$140.00
$26.00
$184.00
$46.00
$184.00
$46.00
CITY OF CUPERTINO
Resolution 04-29I1April19, 2004
Fees Effective July 1,2004
Schedule A - Geueral (coutiuued)
Massage Managing Empioyee Fee (Includes
fingerprinting and background check)
Renewals
$184,00
$46,00
Massage Permit Appeal (Denial/Revocation)
$145.00
Taxi Driver Permits (Includes fingerprinting and
background check)
Renewals
$184,00
$46.00
All Municipal Code Parking Violations
$35.00
CVC Parking Citation Dismissals Admin. Fee
$25.00
Noise Variances
$140.00
Duplicate Business Licenses
$20,00
Business License Exemption Administrative Fee
$50,00
Business License Database
$100,00
New Business Monthly Reports
15.00/month
Community Festivals
$8.00/day/vendor
Farmers Market
$2.00/week/vendor
Flea Markets
$8.50/month/vendor
Sign Removal (Public Right-of-Way)
$15.00/sign
Dangerous Dog Annual Registration Fee
$177.00
Internet Processing Fee
$2.00/transaction
Police Disturbances
Actual Cost.
Abatement Fee
Actual Cost.
Research and Compilation of New Records Fee (For
information requests greater than 1/2 hour.)
Actual Cost.
Graffiti Cleanup
Actual Cost.
CITV 011 CUPERTINO
Resolution 04-2911April 19, 2004
Fees Effective July 1, 2004
Schedule A - General (Continued)
Public Requests for GIS Printed Maps
Standard pre-formatted maps
Plotted maps
Printed maps
$25.00
$2.00
Custom request maps
Actual Cost"
Public Requests for GIS Data
Digital data layers for GIS Data
$25.00/layer
$200.00 for all city layers
Custom request data layers on CDROM
Actual Cost"
Ortho-rectified aerial photography
$25,OO/tile
$300,00 full City of Cupertino (153 tiles)
Damage to City Property
Grounds, Streets, Facilities
Traffic-Engineering
Traffic-Maintenance
Actual Cost"
Code Enforcement
Actual Cost.
.
Actual cost is: 1) Employee hourly rate plus 40% for benefits and overhead, and 2) cost of materials,
contractors and supplies.
CITY OF CUPERTINO
Resolution 04-291/April19, 2004
Fees Effective July 1, 2004
Schedule B - Eugiueering
Street Cuts
Miscellaneous; greater of $870 minimum or 5% of cost improvements
Utility; greater of$I,030 minimum or 5% of cost of improvements
Grading permit; greater of $3,300 minimum or 6% of cost of improvements
Pracel Map/Tract Map
Parcel Map (1-4 lots)
Tract Map (> 4 lots)
Plan Check & Inspection
Review of Building Permit
Improvement Agreement
Residential; greater of $2, 130 minimum or 5% of cost of improvements
Commercial; greater of $3,440 minimum or 6% of cost of improvements
Annexation (plus county filing fee)
Certificates of Compliance
Encroachment Permits
Residential
Non-Residential
Annual Utility Company
Lot Line Adjustment
Soil & Geo Reports (plus any material/service fees)
Short Report
Long Report
Geo Report Deposit
Engineering Copies
Engineering Micro fiche
Traffic Micro fiche
Improvement Plans
Traffic Reports/Plans
Microfilm
Transportation Permit
Single
Annual Utility Company
Telecommuncations Facility Fee (5% increase per year)
Installation Rate
Occupancy Rate
Banners
$870.00 minimum
$1,303,00 minimum
$3,300.00 minimum
$3,250.00
$6,750.00
$1,700,00
$2,130,00 minimum
$3,440.00 minimum
$1,400.00
$1,200.00
$990.00
$1,000.00
$325.00
$2,300,00
$575.00
$575,00
$7,150.00
$30.00/sheet
$40.00/sheet
$30.00/sheet
$40.00/sheet
$33.00/sheet
$500.00
$500.00
$1.74/lineal foot of
conduitlyr
$0.87/lineal ft, ofleased
conduitlyr
$320.00
CITY OF CUPERTINO
Resolution 04-2911April19, 2004
Fees Effective July 1, 2004
Schedule B - Engineering (continued)
* Aerial Photo Customer Work
$240.00/sheet
* Soil/Geo Report Research
$1,200.00
* Special Events
$1,090.00
* Schools - Traffic Request
$1,230.00
* Insurance Review
$315.00
* Block PartylParade ($950,00)
No Charge
* Vacation of Public Street ROW
$460.00
* Small Traffic Calming Request
$890.00
* Comprehensive Neighborhood Traffic Request
$1,720,00
* Certificate of Correction
$130.00
* Floodplain Evaluation
$50.00
* Permit Parking Study
$880.00
* Permit Parking Issuance
$45,00
* Research
$170.001hr.
* New fees for 2004-05 per PRM Group fee study.
CITY OF CUPERTINO
Resolution 04-29I/April19, 2004
Fees Effective July 1, 2004
Schedule C - Definition of Planning Fee Services
Major
Five thousand or more square feet commercial; 10,000 or more square feet office/industrial; eight or
more residential units,
Minor
Less than 5,000 square feet commercial; less than 10,000 square feet office/industrial; less than eight
residential units,
Appeal
A request from the project applicant or interested party to reverse or amend a decision made by staff
or an advisory body. An appointed public official serving on the board that made the decision subject
to the appeal, an appointed public official serving on a board that is directly affected by the decision
and the City Council members are exempted from the fee requirement.
Directors Application
An application that receives final approval by staff either via an advertised public hearing or non-
hearing format. The application may involve a pre-application meeting and/or Environmental
Review committee review,
Temporary Sign Permit
A staff review of a temporary sign application that includes an evaluation of the sign request, the
entry into the temporary log and site review by Code Enforcement Officers. The permit fee is in
addition to the submittal of a deposit to guarantee removal of the sign upon expiration of the
temporary permit.
Tentative Map
Five or more parcels,
Parcel Map
Four or less parcels.
Housing Mitigation Fee
Fee collected is used to construct new affordable residential units for Cupertino residents and
employees. The fees mitigate the need for affordable units caused by expanding offices creating new
jobs and new residential development, office, R&D, industrial and residential development.
NOTES:
Mixed use applications will be classified based upon the highest intensity and review process.
The Director of Community Development will have discretion to classify projects based upon the
above criteria,
CITY OF CUPERTINO
Resolution 04-2911AprilI9, 2004
Fees Effective July 1, 2004
Schedule C - Planning
General Plan Amendment Authorization - Major
$3,590.00
General Plan Amendment Authorization - Minor
$1,795.00
Study Session
$3,590.00
General Plan Amendment - Major
$11,185.00
General Plan Amendment - Minor
$5,593.00
Development Agreement
$14,789.00
Zoning-Minor
$2,770.00
Zoning < one acre
$5,539.00
Zoning one to five acres
$8,420.00
Zoning> five acres
$11,473.00
Tentative Map
$12,206.00
Use Permit - Major
$12,206,00
Exception (per exception)
$2,150,00
Amendment to Development Approval
$3,260,00
Hillside Exeption
$5,407.00
Parcel Map
$5,701.00
Use Permit - Minor
$5,701.00
Planning Commission - Architectural and Site Approval
$5,701.00
Planning Commission Interpretation
$2,849.00
Planning Commission - Tree Removal
$2,462.00
Environmental Impact Report
$21,353,00
Negative Declaration - Major
$3,285,00
Negative Declaration - Minor
$1,643.00
Categorical Exemption
$191.00
CITY OF CUPERTINO
Resolution 04-2911April19, 2004
Fees Effective July 1, 2004
Schedule C - Plauuiug (Continued)
Design Review Committee - Architectural and Site Approval
$2,757.00
R-l Design Review
$1,915,00
R-l Exception
$1,339.00
Sign Exception
$1,612,00
Fence Exception
$549.00
Director - Variance
$1.377.00
Director - Minor Modification
$963.00
Director - Tree Removal
$795.00
Temporary Use Permit
$1,100.00
$161.00
Temporary Sign Permit
Sign Program
$551.00
Appeal
$145.00
Zoning, Planning, Municipal Code (Building Permit Fees)
Commercial/Multi-Family
Residential Single Family
$O.21/sq, ft.
$O,111sq, ft.
Wireless Master Plan Fee: Equipment Mount on Existing Light Standard
or Utility Pole
$5,OO/mount
Wireless Master Plan Fee: Other Personal Wireless Facility
$1,000.00/facility
Housing Mitigation In-Lieu Fees
Residential
Office/lndustrial/R&D
$1.l5/sq. ft.
$2.25/sq, ft.
Stevens Creek Blvd. Specific Plan Fee
$.044/sq, ft.
CITY OF CUPERTINO
Resolution 04-29I/April19, 2004
Fees Effective July I, 2004
Schedule D - Building Valuation Schedule
OCCUPANCY AND TYPE
1. APARTMENT HOUSES
*Type I or II F.R.
Type V - Masonry or Type III
Type V - Wood Frame
Type I - Basement Garage
REMODEL COST PER SQ. FT.
COST PER NEW SQ. FT.
$42,94
$35.41
$32.74
$20.77
$136.81
$111.13
$102.73
$ 46,85
2. AUDITORIUMS
Type 1 or 11 F.R.
Typell-I-Hour
Type II - N
Type II1-1-Hour
Type 111 - N
Type V - I-Hour
Type V - N
5. CHURCHES
Type I or 11 F,R,
Type 11 -I-Hour
Type II - N
Typelll-I-Hour
Type III - N
Type V - I-Hour
$44,65 $131.29
$32,74 $ 95,09
$32,70 $ 89,95
$32,74 $ 99,97
$32.74 $ 94,84
$32.74 $ 95.58
$32.47 $ 89.20
$56.70 $185.54
$56.52 $136.68
$56.42 $132.29
$57.87 $150.84
$57.81 $145.45
$45.96 $136.68
$45.90 $130.92
$27.37 $ 63.90
$27.37 $ 59.63
$27.39 $ 69.53
$27.37 $ 65.02
$27.34 $ 46.85
$40.28 $124,28
$32.71 $ 93.34
$32.70 $ 88,69
$32.74 $101.48
$32.74 $ 96.97
$32.74 $ 89.20
3. BANKS
*Type 1 or II F.R.
Type I1-1-Hour
Type 11 - N
Type Ill-I-Hour
Type III - N
Type V - I-Hour
TypeV-N
4. BOWLING ALLEYS
Type II - I-Hour
Type 11 - N
Type Ill-I-Hour
Type 111 - N
Type V - I-I Hour
* Add 0.5 percent to total cost for each story over three
**Deduct 11 percent for mini-warehouses
***Deduct 20 percent for "shell only" buildings
CITY OF CUPERTINO
Resolution 04-291/AprilI9, 2004
Fees Effective July 1,2004
Schedule D - Buildiug Valuatiou Schedule
OCCUPANCY AND TYPE
SQ. FT.
6. CONVALESCENT HOSPITALS
'Type I or 11 F.R.
Type 11 I-Hour
Type II1-1-Hour
Type V - I-Hour
REMODEL COST PER SQ. FT.
COST PER NEW
10. HOSPITALS
'Type 1 or 11 F.R.
Typelll-l-Hour
Type V - I-Hour
$58.00 $174.39
$41.99 $121.02
$41.99 $124.03
$41.95 $116,88
$39.31 $121.40
$39.31 $115.76
$16.93 $ 29.07
$16.93 $ 22.18
$45,88 $143.32
$35,03 $ 94.33
$35.00 $ 88,95
$35.03 $103.23
$35.03 $ 98.85
$35,08 $ 96.84
$35.00 $ 91.83
$43.32 $129.92
$35.03 $105.49
$35,03 $100,97
$35.08 $109,87
$35.08 $105.36
$35.05 $106,11
$35.03 $102.47
$67.39 $204.46
$56.67 $169,25
$52.66 $161.49
7. DWELLINGS
Type V - Masonry
Type V - Wood Frame
Basements
Semi-Finished
Unfinished
8. FIRE STATIONS
Type I or 11 F.R.
Type 11 - I-Hour
Type 11 - N
Type II1-1-Hour
Type III - N
Type V - I-Hour
Type V - N
9. HOMES FOR THE ELDERLY
Type I or 11 F.R.
Type 11-l-Hour
Type 11 - N
Type lll-l-Hour
Type 111 - N
Type V - I-Hour
Type V - N
'Add 0.5 percent to total cost for each story over three
"Deduct 11 percent for mini-warehouse
"'Deduct 20 percent for "shell only" buildings
"" Add 25% for hazardous occupancy or high tech
CITV 011 CUPEnTINO
Resolution 04-29I/April19, 2004
Fees Effective July I, 2004
Schedule D - Buildlug Valuatlou Schedule
OCCUPANCY AND TYPE
SQ. FT.
REMODEL COST PER SQ. FT.
COST PER NEW
11. HOTELS AND MOTELS
'Type I or II F.R.
Type Ill-I-Hour
Type III - N
Type V - I-Hour
TypeV-N
$43,19
$40,57
$34.06
$34,09
$34.06
$126.54
$109.62
$104.48
$ 95.47
$ 98.67
12. INDUSTRIAL PLANTS ****
Type 1 or 11 F.R.
Type II -l-Hour
Type II - (Stock)
Type III - I-Hour
Type III - N
Tilt-Up
Type V - I-Hour
Type V - N
$26.14
$26.09
$26.09
$26.11
$26.11
$26,11
$26,11
$26,09
$ 71.28
$ 49.61
$ 45.60
$ 54.62
$ 51.49
$ 40.83
$ 51.49
$ 47.10
13. JAILS
Type I or 11 F.R.
Type III - I-Hour
Type V - I-Hour
$66.05
$62.13
$49.92
$199.32
$182,29
$136.68
14. LIBRARIES
Type 1 or 11 F.R,
Type l1-I-Hour
Type 11 - N
Typell1-1-I-Hour
Type 111 - N
Type V - I-Hour
Type V - N
$48,60
$34.06
$34,06
$33,87
$34.09
$34.09
$34.06
$145.83
$106.74
$101.48
$112.76
$107.09
$105.87
$107.02
15. MEDICAL OFFICES ****
Type 1 or II F.R.
Type I1-1-Hour
Type 11 - N
Type Ill-I-Hour
Type III - N
Type V - I-Hour
Type V - N
$57.86
$43.27
$43.27
$43.32
$43.32
$43.27
$43.27
$149.71
$115.51
$109.74
$125.28
$116.63
$113.00
$109.00
'Add 0.5 percent to total cost for each story over three
"Deduct 11 percent for mini-warehouse
"'Deduct 20 percent for "shell only" buildings
,." Add 25% for hazardous or high tech occupancies
CITY OF CUPERTINO
Resolution 04-29I1April19, 2004
Fees Effective July 1, 2004
Schedule D - Building Valuation Schedule
OCCUPANCY AND TYPE
SQ. FT.
REMODEL COST PER SQ. FT.
COST PER NEW
16. OFFICES
Type I or II F,R.
Type I1-1-Hour
Type 11 - N
Type Ill-I-Hour
Type 111 - N
Type V - I-Hour
TypeV-N
$52.57
$35.32
$35.32
$35.35
$35.41
$35.32
$35.32
$133.25
$ 89.58
$ 85,31
$ 96,72
$ 92.45
$ 90.57
$ 85.31
17. PRIVATE GARAGES
Wood Frame
Masonry
Open carports/covered decks/porches
Uncovered decks
$16.92
$16.92
$11.68
$11.47
$ 30.44
$ 34.33
$ 20.79
$ 17.48
18. PUBLIC BUILDINGS
Type 1 or 11 F.R.
Type 11-1-Hour
Type 11 - N
Type 111-I-Hour
Type III - N
Type V - I-Hour
TypeV-N
$60.45
$45.90
$45.85
$45.95
$45,90
$45.85
$45.85
$160.00
$125.28
$119.77
$130,04
$125,53
$119.02
$114.75
19. PUBLIC GARAGES
Type I or II F.R.
Type 1 or 11 Open Parking
Typell-N
Type III-1-Hour
Type III - N
Type V -l-Hour
$26.14
$26,06
$26,09
$26,09
$26.09
$26.09
$ 61.26
$ 45.98
$ 35.08
$ 46.36
$ 41.22
$ 42.22
20. RESTAURANTS
'Type I11-1-Hour
Type 111 - N
Type V - I-Hour
Type V - N
$65.60
$65.60
$59,06
$56,22
$122,02
$117.89
$111.75
$107.37
'Add 0.5 percent to total cost for each story over three
"Deduct II percent for mini-warehouse
"'Deduct 20 percent for "shell only" buildings
"" Add 25% for hazardous or high tech occupancies
OCCUPANCY AND TYPE
SQ. FT.
21. SCHOOLS
Type 1 or II F,R,
Type 11 - I-Hour
Type III - I-Hour
Type 111 - N
Type V - I-Hour
Type V - N
22. SERVICE STATIONS
Type 11 - N
Type Ill-I-Hour
Type V - I-Hour
Canopies
23. STORES
*Type I or II F.R.
Type II -l-Hour
Type 11 - N
Type Ill-I-Hour
Type 111 - N
Type V - 1 Hour
Type V - N
24. THEATERS
Type 1 or 11 F,R,
Type II1-1-Hour
Type 111 - N
Type V - I-Hour
TypeV-N
25. W AREHOUSES**
Type I or 11 F.R.
Type 11 or V-I-Hour
Type II orV-N
Type II1-1-Hour
Type III - N
CITY OF CUPERTINO
Resolution 04-2911April19, 2004
Fees Effective July 1, 2004
Schedule D - Building Valuation Schedule
REMODEL COST PER SQ. FT.
* Add 0,5 percent to total cost for each story over three
**Deduct 11 percent for mini-warehouse
***Deduct 20 percent for "shell only" buildings
**** Add 25% for hazardous or high tech occupancies
$65,74
$48.43
$48.43
$45.80
$45.80
$45.74
$45,15
$45.16
$45,09
$45.00
$40,58
$36,56
$36,61
$36.65
$36.61
$36.57
$36.56
$52,57
$37,94
$36.74
$35.32
$34.00
$36.56
$18.26
$18.26
$18.26
$18.25
COST PER NEW
$139.31
$ 95.09
$101.73
$ 97.84
$ 97,84
$ 90,95
$ 84.19
$ 87.82
$ 74.79
$ 35.08
$103,23
$ 63.14
$ 61.76
$ 76.79
$ 72.04
$ 64.64
$ 59.76
$137.55
$100.23
$ 95.47
$ 94.33
$ 89.20
$ 61.89
$ 36.70
$ 34.46
$ 41.59
$ 39.59
Commercial
Residential
Sprinkler Systems
CITY OF CUPERTINO
Resolution 04-2911April19, 2004
Fees Effective July 1, 2004
Schedule D - Buildiug Valuation Schedule
EQUIPMENT AND AIR CONDITIONING
$
$
$
5.26
4.39
3.25
RETAINING WALLS, PER SQ. FT. (HEIGHT X LENGTH) AREA ABOVE GRADE
Masonry
Concrete
$ 30,07
$ 26.46
..............................................................................,
Address Changes
$268.92
CITY OF CUPERTINO
Resolution 04-2911AprilI9, 2004
Fees Effective July I, 2004
Schedule D - Buildiug Permit
Permit Valuation
$1 - $3,000
$83.16
$3,001 - 25,000
$93.96 for the first $3,000 plus $10.80 for each additional
$1,000 or traction thereof, to and including $25,000,
$25,001 - 50,000
$324.00 for the first $25,000 plus $8.64 for each additional
$1,000 or fraction thereof, to and including $50,000,
$50,001 - 100,000
$540,00 for the first $50,000 plus $6.48 for each additional
$1,000 or traction thereof, to and including $100,000.
$100,001 - 500,000
$851.04 for the first $100,000 plus $4.32 for each additional
$1,000 or traction thereof, to and including $500,000.
$500,001 - 1,000,000
$2,817.72 for the first $500,000 plus $3,24 for each additional
$1,000 or fraction thereof, to and including $1,000,000.
$1,000,001 -
$4,795.20 for the first $1,000,000 and up plus $2.16 for each
additional $1,000 or traction thereof.
PLAN CHECKING
Structural and Non-Structural
1.3345% of building permit fee for each plan submitted. Each additional identical repeat plan for
multi-unit residential developments will be assessed at $34.86 each unit.
Energy
48% of building permit fee for each plan submitted, Each additional identical repeat plan for
multi-unit residential developments will be assessed at $34.86 each unit.
Repeat plan checks that exceed 2 reviews will be charged an hourly rate at $87,14 per hour.
CITY OF CUPERTINO
Resolution 04-291/AprilI9, 2004
Fees Effective July I, 2004
Schedule D - Building - Electrical Fees
New Residential Buildings and Remodels that add additional square footage
The following fees shall include all wiring and electrical equipment in or on each building, or
other electrical equipment on the same premises constructed at the same time.
Permit Fee
$38.37
New multi-family residential buildings (apartments and condominiums) having
three or more living units not including the area of garages, carports and other
non-commercial automobile storage areas constructed at the same time, per
square foot
$.07
New single and two-familv residential buildings not including the area of
garages, carports and other minor accessory buildings constructed at the
same time, per square foot
$.08
For other types of residential occupancies and alterations, additions and
modifications to existing residential buildings, use the UNIT FEE SCHEDULE
New commercial buildings and completely remodeled spaces not including the
Area of garages, per square foot
$.13
Commercia] alterations and modifications to existing buildings, use the
Unit fee schedule
CITV 011 CUPERTINO
Resolution 04-2911AprilI9, 2004
Fees Effective July 1, 2004
Schedule D - Building - Electrical
UNIT FEE SCHEDULE
Remodel- No additional square footage
Permit Fee
Residential Appliances
For fixed residential appliances or receptacle outlets for same, including
wall-mounted electric ovens; counter mounted cooking tops; electric
ranges, self-contained room console, or through-wall air conditioners;
space heaters; food waste grinders; dishwashers washing machines;
water heaters; clothes dryers; or other motor operated appliances not
exceeding one horsepower (HP) in rating each
NOTE: For other types of air conditioners and other motor-driven
appliances having larger electrical ratings, see Power Apparatus,
Non-Residential Appliances
For residential appliances and self-contained factory-wired, non-residential
appliances non exceeding one horsepower (HP), kilowatt (KW), or
kilovotampere (KV A) in rating including medical and dental devices; food,
beverage, and ice cream cabinets; illuminated show cases; drinking fountains;
vending machines; laundry machines; or other similar types of equipment,
each
NOTE: For other types of air conditioners and other motor-driven appliances
having larger electrical ratings, see Power Apparatus.
Services
For services of 600 volts or less and not over 200 amperes in rating, each
For services of600 volts or less and over 200 amperes to 1,000 amperes in
rating, each
For services over 600 volts over 1,000 amperes in rating, each
$ 38.37
$ 4,80
$ 4.80
$ 29.43
$ 59.94
$119,88
CITY OF CUPERTINO
Resolution 04-2911April19, 2004
Fees Effective July 1, 2004
Schedule D - Building - Electrical
USER FEE SCHEDULE
(continued)
Remodel - No additional square footage
Signs, Outline Lighting and Marquees
For signs, outline lighting systems or marquees supplied from one
branch circuit, each
For additional branch circuits within the same sign, outline lighting
system or marquee, each
Miscellaneous Apparatus, Conduits, Conductors, and Special Circuits
For electrical apparatus, conduits and conductors for which a pennit is
required but for which no fee is herein set forth
Power Device/Apparatus
For motors, generators, transfonners, rectifiers, synchronous converters,
capacitors, industrial heating, air conditioners and heat pumps, cooking
or baking equipment and other apparatuses, as follows:
Rating in horsepower (RP), kilowatts (KW), kilovolt-amperes (KV A),
or kilovolt-amperes-reactive (KV AR):
I unit
2 through 5 units, each additional
6 and over, each additional
NOTE:
I, For equipment or appliances having more than one motor, transfonner,
heater, etc., the sum of the combined ratings may be used,
2. These fees include all switches, circuit breakers, contractors, thennostats,
relays and other directly related control equipment.
$23.98
$ 4.80
$27.58
$47.96
$17.99
$11.99
CITY OF CUPERTINO
Resolution 04-2911April19, 2004
Fees Effective July 1, 2004
Schedule D - Buildiug - Electrical
UNIT FEE SCHEDULE
(continued)
Remodel - No additioual square footage
Busways
For trolley and plug-in-type busways, each 100 feet or fj-action thereof
$7.02
Note: An additional fee will be required for lighting fixtures, motors
and other appliances that are connected to trolley and plug-in-type
busways. No fee is required for portable tools,
Receptacle, Switch and Lighting Outlets
For receptacle, switch, lighting or other outlets at which current is
used or controlled, except services, feeders and meters,
First 20 each
Additional outlets, each
NOTE: For multi-outlet assemblies, each 5 feet or
fj-action thereof may be considered as one outlet.
$1.20
$0,73
Lighting Fixtures
For lighting fixtures, sockets or other lamp holding devices
First 20 each
Additional fixtures, each
$1.20
$0.73
For pole or platform-mounted lighting fixtures each
For theatrical-type lighting fixtures or assemblies each
$1.20
$1.20
CITY OF CUPERTINO
Resolution 04-291/April 19, 2004
Fees Effective July 1,2004
Schedule D - Building - Mechanical Fees
New Residential Buildings and Remodels that add additional sqnare footage.
The following fees shall include all mechanical equipment in or on each building, or
other mechanical equipment on the same premised constructed at the same time.
New multi-family residential buildings (apartments and condominiums)
having three or more living units not including the area of garages, carports
and other non-commercial automobile storage areas constructed at the same
time, per square foot
$0,07
New and single and two-familv residential buildings not including the area
of garages, carports and other minor accessory buildings constructed at the
same time, per square foot
$0.08
For other types of residential occupancies and alterations and modifications
To existing building, use the unit fee schedule
New commercial buildings and completelv remodeled spaces not including
The area of garages, per square foot
$0.13
Commercial alterations and modifications to existing buildings, use the unit
Fee schedule
('ITV 01' ('UPRRTINO
Resolution 04-2911April19, 2004
Fees Effective July 1, 2004
Schedule D - Buildlug - Mechanical Fees
UNIT FEE SCHEDULE
Remodels - No additional Square Footage
Permit Fee
For the repair of alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, V A V boxes, absorption unit, or each
heating, cooling, absorption, or evaporative cooling system, including
installation of controls regulated by this Code.
For each air-handling unit, AlC units, heat pumps to and including
10,000 cubic feet per minute, including ducts attached thereto. Does
not apply to central type.
NOTE: This fee shall not apply to an air-handling unit that is a
portion of a factory-assembled appliance, cooling unit, evaporative
cooler or absorption unit for which a permit is required elsewhere
in this Code,
For each air-handling unit AlC unit, heat pump over 10,000 cfm
For the installation or relocation of each commercial or industrial-type
Hood
For the installation of each residential hood that is served by a mechanical
exhaust, including the ducts for such hood
For the installation or relocation of each forced-air or gravity-type furnace
or burner, including ducts and vents attached to such appliance, up to and
including 100,000 Btu!h
For each ventilation system which is not a portion of any heating or
air conditioning system authorized by a permit
For each ventilation fan connected to a single duct
For the installation or relocation of each forced air or gravity type
furnace or burner, including ducts and vents attached to such appliance
over 100,000 Btu/h
$ 38.37
$ 13.19
$ 10,26
$ 17.82
$137.87
$ 10.26
$ 14.31
$ 10.26
$ 7.02
$ 17.55
CITY OF CUPERTINO
Resolution 04-2911April19, 2004
Fees Effective July 1,2004
Schedule D - Building - Mechanical Fees
UNIT FEE SCHEDULE
(continued)
Remodels - No additional Square Footage
For the installation or relocation of each floor fumace, including vent
$ 14.31
For the installation or relocation of each suspended heater, recessed
wall heater or floor-mounted unit heater
$ 14.31
For the installation, relocation or replacement of each appliance vent
installed and not included in an appliance pennit
$ 7.02
For the installation or relocation of each boiler or compressor to and
including three horsepower, or each absorption system to and including
100,000 Btulh (29.3 kw)
$ 14.31
For the installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system
over 100,000 Btu/h and including 500,000 Btu!h
$ 26,19
For the installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or each absorption system
over 500,000 Btu/h to and including 1,000,000 Btu/h
$ 35,91
For the installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption system
over 1,000,000 Btu/h to and including 1,750,000 Btu!h
$ 53.46
For the installation or relocation of each boiler or reffigeration compressor
over 50 horsepower, or each absorption system over 1,750,000 Btu/h
$89.37
For each appliance or piece of equipment regulated by this Code but not
classed in other appliance categories, or for which no other fee is listed
in this Code
$ 10.26
CITY OF CUPERTINO
Resolution 04-2911April19, 2004
Fees Effective July 1, 2004
Schedule D - Building - Plumbing Fees
New Residential Buildings and Remodels that add additional square footage
The fo1lowing fees sha1l include a1l plumbing equipment in or on each building, or other
plumbing equipment on the same premises constructed at the same time,
New multi-family residential buildings (apartments and condominiums) having
three or more living units not including the area of garages, carports and other
non-commercial automobile storage areas constructed at the same, per square
foot
$0.07
New single and two-family residential buildings not including the area of
garages, carports and other minor accessory buildings constructed at the same
time, per square foot
$0.08
For other types of residential occupancies and alterations and modifications
To existing building, use the unit fee schedule
New commercial buildings and completely remodeled spaces not including
The area of garages, per square foot
$0.13
Commercial alterations and modifications to existing buildings, use the
unit fee schedule
CITY 011 CUPRRTINO
Resolution 04-2911AprilI9, 2004
Fees Effective July 1, 2004
Schedule D - Building - Plumbing Fees
UNIT FEE SCHEDULE
Remodel- No additional Square Footage
Permit Fee
$38.37
For installation, alteration or repair of water piping water treating
equipment
$ 9.00
For repair or alteration of drainage or vent piping, floor, area,
condensate piping
$ 9.00
For each plumbing fixture or trap or set of fixtures on one trap
(including water, drainage piping and backflow protection therefor)
$ 9.00
For each gas piping system of one (1) to four (4) outlets
$ 5.40
For each gas piping system of five (5) or more, per outlet
$ 1.20
For each industrial waste pre-treatment interceptor, including its trap
and vent, excepting kitchen type grease traps functioning as fixture
traps
$17,99
Kitchen type trap and/or system
$ 9.00
$21.58
For each building sewer, sanitary sewer, and each trailer park sewer
Storm/rainwater systems per drain
$ 9.00
For each water heater and/or vent
Water service
$10.79
$ 9.00
Re-pipe per fixture
$ 9,00
CITY OF CUPERTINO
Resolution 04-2911April19, 2004
Fees Effective July 1, 2004
Schedule D - Buildiug - Plumbiug Fees
UNITS FEE SCHEDULE
Remodel- No additional Square Footage
(continued)
For each lawn sprinkler system on anyone meter, including backflow
protection devices therefor
$13.19
Five (5) or more, each
$ 1.08
For atmospheric type vacuum breakerslbacld1ow not included in item I
1 to 5
over 5 each additional
$10.79
$ 2.16
$67.14
For each private sewage disposal system
For each cesspool
$33.57
CITY OF CUPERTINO
Resolution 04-2911April 19, 2004
Fees Effective July 1, 2004
Schedule D
OTHER BUILDING INSPECTION FEES
Private Swimming Pools
For new private, residential, in-ground, swimming pools for
single-family and multi-family occupancies including a complete
system of necessary branch circuit wiring, bonding, grounding,
underwater lighting, water pumping and other similar electrical
equipment directly related to the operation of a swimming pool,
each including plan check and energy.
$540.00
For other types of swimming pools, therapeutic whirlpools,
spas and alterations to existing swimming pools, use the
UNIT FEE SCHEDULE
Temporary Power Service
For a temporary service power pole or pedestal including all
pole or pedestal-mounted receptacle outlets and appurtenances,
each.
$62.10
For a temporary distribution system and temporary lighting
and receptacle outlets for construction sites, decorative light,
Christmas tree sales lots, fireworks stands, etc, each.
$11.88
Inspection outside of the normal business hours
(minimum charge two hours)
$90.72/hr,
Inspection for which no fee is specifically established
(minimum charge one hour)
$68.04/hr,
Re-inspection - A fee may be assessed for each inspection or re-inspection
when such portion of work for which inspection is called is not complete
or when corrections called for are not made.
$176,18
CITV OF CUPERTINO
Resolution 04-2911April19, 2004
Fees Effective July 1, 2004
Schedule E - Recreation
Recreation classes and excursion fees shall be detennined as follows:
Classes
I, Detennine the maximum hourly rate paid to instructor.
2. Multiply the instructor's hourly rate by the number of class meetings,
3. Detennine the minimum number of participants and divide into the instructor's cost.
4, Add indirect overhead percent - 32%.
5, Add 20% to establish non-resident fee.
6, Add cost for specialized equipment or supplies.
Special conditions: For classes taught by contract instructors, the indirect overhead is only
added to the City's percentage.
Excursions
I. Transportation cost divided by the number of participants plus overhead transfer,
2. Add 20% to establish non-resident fee.
3. Add any admission cost, supplies or leadership cost.
Additional factors that mav be used to detennine the class or excursion user fee:
The total number of participants in a given activity may generate additional revenue whereby
the total program cost may be reduced,
Classes that traditionally have waiting lists may have the user fee increased.
Programs in competition with adjacent cities or the private sector may require fees to be
increased or decreased to remain competitive,
CITY 011 CUPRRTINO
Resolution 04-2911April19, 2004
Fees Effective July 1, 2004
Schedule E - Recreation
Facility Use Fee Schedule (Staff Use Only)
CLASSIFICATIONS: Priority of Use
Group I:
Group II:
Group III:
Group IV:
Group V:
Group VI:
City of Cupertino activities that are open to the public. Official city sponsored
programs,
Clubs with 51 % resident membership, recreation programs and events with full or
affiliated city co-sponsorship and open to the public.
Programs and events sponsored by Cupertino based non-profit recreation,
education or community service organization with 51 % resident participation.
These organizations must show an official structure and status.
Private, special interest or business groups for functions not open to the public,
These functions would include parties, banquets, receptions, industrial
conferences, seminars, trade shows, etc.
Programs and events sponsored by non-resident non-profit recreation, education
or community service organization. These organizations must show official
structure and status.
Cupertino Businesses using the Cupertino Room of the Quinlan Community
Center for promotional and business related purposes other than negotiation or
direct sale.
CITY OF CUPERTINO
Resolution 04-29I1April19, 2004
Fees Effective July 1, 2004
Schedule E - Recreation
Quinlan Community Ceuter
ROOM RENTAL SCHEDULE PER HOUR
Cupertino Room Mondav - Thursday Fridav - Sundav
Group II N/A $17
Group III $30 $80
Group IV $140 $230
Group V $50 $140
Group VI $265 $265
Classroom
Group II N/A $12
Group III $20 $60
Group IV $45 $90
Group V $25 $75
Conference Room
Group II N/A $12
Group III $10 $25
Group IV $40 $60
Group V $25 $50
Security Staff
Security staff is required when alcohol is served at any City facility: $25.00 per hour.
Overtime Fee
Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first
half hour, and $150,00 for every half hour thereafter. This charge will be deducted from the security
deposit. This applies to all City facilities.
Security Deposit
A security deposit shall be required for Groups III, IV, V, and VI. Security deposit is due at time of
reservation. The Department Director may also require a deposit based on the nature of an event. The
security deposit will be refunded ifno damage occurs, rooms are left in clean condition, and permits
conclude on time.
Quinlan Community Center
Cupertino Room - Groups IV, VI
All Other Rooms - Group IV
Group II, II, V - All Rooms
$750
$300
$300
CITY OF CUPERTINO
Resolution 04-29I/April19, 2004
Fees Effective July 1, 2004
Schedule E - Recreatiou
Monta Vista Recreation Center
Creekside Park Building
Room Rental Schedule Per Hour
Monta Vista Recreation Center
Creekside Park Building
Multi-Purpose
Group III
Group IV
Group V
N/A
N/A
N/A
N/A
N/A
N/A
Classroom
Group II
Group III
Group IV
Group V
$15
$15
$30
$20
$15
$15
$30
$20
Conference RoomlKitchen
Group II
Group III
Group IV
Group V
$15
$15
$25
$20
N/A
N/A
N/A
N/A
Security Staff
Security staff is required when alcohol is served at any City facility: $25.00 per hour.
Overtime Fee
Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first
half hour, and $150.00 for every half hour thereafter, This charge will be deducted ITom the security
deposit. This applies to all City facilities.
Securitv Deposit
A security deposit shall be required for Groups III, IV, V, and VI. Security deposit is due at time of
reservation. The Department Director may also require a deposit based on the nature of an event. The
security deposit will be refunded ifno damage occurs, rooms are left in clean condition, and permits
conclude on time.
CITY OF CUPERTINO
Resolution 04-2911AprilI9, 2004
Fees Effective Jnly I, 2004
Schedule E - Recreation
Senior Center
Room Rental Schedule Per Hour
Reception Room
Evenings and Weekends'
Group II
Group III
Group IV
Group V
$12
$80
$230
$140
Classroom, Conference Room, Arts & Crafts
Room, Bay Room
Group II
Group III
Group IV
Group V
$12
$60
$90
$75
'Senior Center rooms are not available for rental Monday through Thursday 8:00 a.m, to 10:00 p.m. and
Friday, 8:00 a.m. to 5:00 p,m,
Security Staff
Security staff is required when alcohol is served at any City facility: $25.00 per hour,
Overtime Fee
Functions exceeding the permitted reservation time shall be charged $150.00 for any time up to the first
half hour, and $150,00 for every half hour thereafter, This charge will be deducted trom the security
deposit. This applies to all City facilities.
Security Deposit
A security deposit shall be required for Groups III, IV, V, and VI. Security deposit is due at time of
reservation. The Department Director may also require a deposit based on the nature of an event. The
security deposit will be refunded ifno damage occurs, rooms are left in clean condition, and permits
conclude on time.
Cupertino Senior Center
Reception Hall - Group IV
All Other Rooms - Group IV
Group II, III, V ~ All Rooms
$750
$300
$300
CITY OF CUPERTINO
Resolution 04-2911AprilI9, 2004
Fees Effective July I, 2004
Schedule E - Recreatiou
OUTDOOR FACILITIES
Memorial Softball Field
Cupertino residents/businesses only
Non-Residents
Field can be reserved for a maximum of2 hours
THERE IS NO FEE FOR CURRENT SOFTBALL TEAMS PLAYING
IN CUPERTINO LEAGUES
Field preparation
(includes dragging, watering, chalking, and bases)
Field Attendant (2 hour minimum)
Field Attendant is required any time lights or field preparation
is requested.
Lights (in the evening)
Memorial Park Amphitheater
Cupertino residentJResident business
Non-residentINon-resident business
Memorial Park Gazebo
Cupertino residentJResident business
Non-residentINon-resident business
Picnic Areas (Daily Rate)
Cupertino residents
Cupertino business
Non-residents
Non-resident business
Electricity at Memorial or Linda Vista Park
Sports Field Fees
Adult Leagues (two hour minimum)
Deposit
Youth Leagues
$25.00
$40.00
$36.50
$ 8.25/hr,
$ 5.00/hr.
$55.00
$75.00
$55.00
$75.00
$ 55.00
$ 75.00
$ 80.00
$100.00
$ 25,00
$50.00/hr
$600.00
$11.00/
Participant/Season
CITV OJ? CUPRRTINO
Resolution 04-291 April 19, 2004
Fees Effective July 1, 2004
Schedule E - Recreation
BLACKBERRY FARM PICNIC GROUNDS
General Admission:
ADULT (13 years and over)
CHILD (6 through 12)
Group Rates:
Weekends & Holidavs
Resident
$8.00
Non-Resident
$9.00
$5.00
$6.00
Weekends & Holidavs
Adult
(13 & Older)
100-500
persons $8.50
501-1,000 $8,00
1,001 or more $7.50
Full Summer Pass
Available any day the park is open:
Adult (13 & Up)
Child (6 to 12 years old)
Family Pass (2 people)
Family Pass (3 people)
Family Pass (4 people)
Family Pass (5 people)
Family Pass (6 people)
Child
(6-12)
$6.50
$6.00
$5.50
Resident
$85.00
$60,00
$140.00
$150.00
$160.00
$170.00
$180.00
Weekdavs
Resident
$5.00
Non-Resident
$6.00
$4,00
$5.00
Weekdays
Adult Child
(13 & Older) (6-12)
$5.75 $4.75
$5.50 $4.50
$5.25 $4.25
Non-Resident
$110.00
$70,00
$170.00
$180.00
$190,00
$200.00
$210.00
CITY OF CUPERTINO
Resolution 04-2911AprilI9, 2004
Fees Effective July 1, 2004
Schedule E - Recreatiou
to-Day Pass
Available any 10 days the park is open:
Resident
Adult (13 and older)
$40,00
Child (6 to 12 years old)
$32.50
Children under 6 are free when accompanied by their parents
BLACKBERRY FARM GOLF COURSE
Weekends
Resident Non-Resident
9-Holes $13,00 $15.00
Junior & Senior N/A N/A
Second 9 Holes (all $11.00 $13,00
players)
Non-Resident
$45.00
$36.00
Weekdavs
Resident Non-Resident
$11.00 $13,00
$10.00 $12.00
$10.00 $12,00
All groups and toumaments pay the full rate (Cupertino resident still applies).
Staff is authorized to set merchandise fees according to current cost.
BLACKBERRY FARM RETREAT CENTER
Conference Room (9:00 a.m. to 5:00 p,m., with meals)
$69.95/person
CITY OF CUPERTINO
Resolution 04-291/April19, 2004
Fees Effective July 1, 2004
Schedule E - Recreation
BLACKBERRY FARM GOLF COURSE
Annual Rate (Weekdays Only)
Semi-Annual Rate (Weekdays Only)
Adults (17-61) JrlSr
$850 $775
$1,000 $925
$455 $415
$540 $495
Cupertino Residents
Non-Residents
Cupertino Residents
Non-Residents
Snper-Annual Rates (Good on Weekends &
Holidays)
Cupertino Residents
Non-Residents
$1,000
$1,125
$1,000
$1,125
Super-Semi Annual Rates (Good on Weekends &
Holidays)
Cupertino Residents
Non-Residents
$500
$600
$500
$600
Quick Passes (Ten-play card for the price of
nine)
Cupertino Resident Weekday
Cupertino Resident Weekend
Green Fees
$99 $90
$117 $117
$126 $108
$135 $135
$11 $10
$13 $13
$13 $12
$15 $15
Non-Resident Weekday
Non-Resident Weekend
Cupertino Resident Weekday
Cupertino Resident Weekend
Non-Resident Weekday
Non-Resident Weekend
CITY OF CUPERTINO
Resolution 04-2911AprilI9, 2004
Fees Effective July 1,2004
Schedule E - Recreatiou
CUPERTINO SPORTS CENTER
Day Passes ~ Resident Non-Resident
$7,00 $10.00
Monthly Passes
One Month Single $55.00 $65.00
One Month Couple $75.00 $90.00
One Month Family $95.00 $115.00
Annual Passes
One Year Single $395.00 $425,00
One Year Couple $780.00 $850.00
One Year Family $875.00 $950.00
One Year Senior $350.00 $375.00
ADDITIONAL CONDITIONS
I. Annual fee for Juniors (17 years and younger) of$270.00 Resident, $300.00 Non-Resident.
2. Annual fee for seniors (62 years and older) of$350.00 Resident, $375.00 Non-Resident
3. The Cupertino Tennis Club will be charged $lO,OO/hour during primetime and $6.00/hour per court
during non-primetime for all c.T.C. sponsored activities other than U.S.T.A. leagues and practices.
4. All competitors in c.T.c./U.S.T.A. leagues participating at the Sports Center must purchase an
annual pass,
5.
Individuals may purchase a ten pack of day passes, $60.00 Resident, $90,00 Non-Resident.
6.
Specials will be offered on an on-going basis.
CUPERTINO TEEN CENTER
Rental Rate
Deposit
$150.00
$750.00
Overtime Rate
$200,00 first hour
$100,00 each half hour after
Non-Resident Rate:
Daily use fee
Monthly pass
Annual pass
$3.00
$20.00/month
$200.00/yr,
Child Watch Fees
One visit:
Ten visits:
One Month Pass:
$5.00
$45.00
$$100.00
CITY OF CUPERTINO
Resolution 04-29I1April19, 2004
Fees Effective July I, 2004
Schedule E - Recreation
Community Hall
ROOM RENTAL SCHEDULE PER HOUR
Group II
Group III
Group IV
Group V
Group VI
Mondav - Thursday
$40
$40
$150
$60
$275
Fridav - Sundav
$90
$90
$240
$150
$275
Security Staff
Security staff is required when alcohol is served at any City facility: $25.00 per hour.
Overtime Fee
Functions exceeding the pennitted reservation time shall be charged $150,00 for any time up to the first
half hour, and $150.00 for every half hour thereafter, This charge will be deducted from the security
deposit. This applies to all City facilities,
Security Deposit
A security deposit shall be required for Groups III, IV, V, and VI. Security deposit is due at time of
reservation, The Department Director may also require a deposit based on the nature of an event. The
security deposit will be refunded if no damage occurs, rooms are left in clean condition, and pennits
conclude on time,
Community Hall
Groups IV, VI
Groups II, III, V
$750
$300