Loading...
HomeMy WebLinkAboutAH Packet 02-11-2016CITY OF CUPERTINO AGENDA Thursday, February 11, 2016 10300 Torre Avenue, City Hall Conference Room C ADMINISTRATIVE HEARING 5:00 PM ROLL CALL APPROVAL OF MINUTES 1.Subject: Draft Minutes of September 24, 2015 Recommended Action: approve or modify the Draft Minutes of September 24, 2015 Draft Minutes of September 24, 2015 2.Subject: Draft Minutes of November 12, 2015 Recommended Action: approve or modify Draft Minutes of November 12, 2015 Draft Minutes of November 12, 2015 ORAL COMMUNICATIONS This portion of the meeting is reserved for persons wishing to address the Hearing Officer on any matter not on the agenda. Speakers are limited to three (3) minutes. In most cases, State law will prohibit the Hearing Officer from making any decisions with respect to a matter not on the agenda. WRITTEN COMMUNICATIONS PUBLIC HEARING ITEMS 3.Subject: Architectural and Site application for approval for an approximately 189 square foot addition to an existing duplex. (Application No.(s): ASA-2015-27; Applicant(s): Frank Ho (Kuei residence); Location: 22466 Rancho Ventura Street; APN: 357-03-012) Recommended Action: Approve the Architectural and Site application (ASA-2015-27) per the draft resolution Staff Report Draft Resolution Plans Page 1 CITY OF CUPERTINO February 11, 2016Administrative Hearing AGENDA 4.Subject: Development Permit to demolish an existing commercial building and construct a new 2,500 square foot commercial building; Architectural and Site approval for a new 2,500 square foot commercial building; Application No.(s): DP-2015-03, ASA-2015-11; Applicant(s): Jeffrey Eaton (Uri Freeland); Location: 21731 Stevens Creek Boulevard APN #326-20-048 Recommended Action: recommend approval of applications DP-2015-03 and ASA-2015-11per the draft resolutions Staff Report Draft Resolution DP-2015-03 Draft Resolution ASA-2015-11 Plan Set Public Comment NEW BUSINESS OLD BUSINESS ADJOURNMENT In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend the next meeting who is visually or hearing impaired or has any disability that needs special assistance should call the City Clerk's Office at 408-777-3223, 48 hours in advance of the meeting to arrange for assistance. Upon request, in advance, by a person with a disability, meeting agendas and writings distributed for the meeting that are public records will be made available in the appropriate alternative format. Also upon request, in advance, an assistive listening device can be made available for use during the meeting. Members of the public are entitled to address the members concerning any item that is described in the notice or agenda for this meeting, before or during consideration of that item. If you wish to address the members on any other item not on the agenda, you may do so during the public comment portion of the meeting. Please limit your comments to three (3) minutes or less. Page 2 CITY OF CUPERTINO Cupertino, CA 95014 (408) 777-3308 ACTIONMINUTES OF THE REGULAR MEETING OF THE ADMINISTRATIVE HEARING HELD ON September 24,2015 ROLL CALL Hearing Officerpresent:Gary Chao, Assist. Director of Community Development Staff present: ErickSerrano, Assistant Planner Applicant(s)present:LexiMoriarty(Sand Hill),Property Owner MikeRohde(Sand Hill), Property Owner CliffChang, the Project Architect John--, Target Express representative APPROVAL OF MINUTES: Minutes of August 13, 2015 The minutes of August 13, 2015 were approved as written Minutes of August 27, 2015 The minutes of August 27, 2015 were approved as written POSTPONEMENTS/REMOVAL FROM CALENDAR: None ORAL COMMUNICATION: A resident, Jennifer Griffin, commented on the enormous amount of construction happening in her area of the City. She wanted to know when the infrastructure of the City would be being “put back together” in terms of road closures, median repairs and sidewalks so that the area would begin to feel normal again. She said the residents have been patient with the upgrades for long enough. WRITTEN COMMUNICATIONS: Emails have been received regarding the public meeting item PUBLIC MEETING: 1.Application No.(s): ASA-2015-23 2 Administrative Hearing September 24, 2015 Applicant:Dean Isaacs (Main Street Cupertino, LLC) Location:19499 Stevens Creek Blvd Architectural and Site approval for final refinements to the previously approved Architectural and Siteapplication (ASA-2014-11) for the Major Retail building and patio at Main Street Cupertino Administrative Hearingdecision final unless appealed. Staff Member Serrano explained that the Main Street Cupertino mixed use development was approved by the City Council and is currently under construction. As tenants of the new retail locations come on board, they are applying to the City for Architectural and Site approvals to “customize” theirlocations for their specific business/customer needs. The application today does not change or modify any of the uses previously approved for the site, does not change the square footage or parking count of the site. This application is to make changes to the Major Retail building such as the relocation of the entry doorsat the southwest corner and northwest corners, the removal and replacement and color changes of the canopies over the entries and exits. The patio along Stevens Creek Boulevard will be modified to allow grade level entries, buffering of the outdoor seating, accessibility enhancement features and landscaping changes to provide better pedestrian access. Staff recommended that that application be approved per the draft resolution. The Hearing Officer asked the applicants if they had any comments to add to the Staff report. Mike Rohde, spoke to on behalf of the tenant, Target Stores. They like the proposed changes to the entries as it will help ‘activate’ the streetscape and make for a better shopping experience. The Hearing Officer opened the Public Hearing: Kathy Sander, Stern Ave.; Asked about the signage. She mentioned that the proposed patio was similar to the one at Panera Bread. She thought that the street is too busy and too noisy to have the outdoor patio seating be located on Stevens Creek Boulevard. She also had concerns about the path of travel the trucks would be using to unload goods for the store. It was explained to her that the signage would be addressed as a separate application for the entire Main Street site in a Master Sign Program. Jennifer Griffin, Calvert Ave.; Asked what the square footage of the Major Retail building and asked about the loading bays and paths of travel of the commercial trucks. She didn’t understand the need for a patio outside of a retail store. She also wanted to know about the use of cart corrals. Lisa Warren, a resident; She stated that she was unhappy that Sandhill Properties agreed to have Target Express as a tenant. She didn’t feel that they were the kind of retail establishment the developer had promised forthe site. She wanted to make sure that the glass for the store front obscured what the store looked like on the inside. She thought that with the other fast food places in the area, the visual (with clear glass) as someone walked along Stevens Creek 3 Administrative Hearing September 24, 2015 Boulevard, would be terrible. She also asked for clarification about the proposed color changes. The Hearing Officer closed the Public Hearing. The project architect, Cliff Chang, addressed the Hearing Officer. He went over the general scope of the tenant improvements. On one corner, Starbucks will open onto an open, stepped patio, so some seating will be at grade level and some will be below. As required by the Building Code, there will be a physical barrier between Stevens Creek and the patio. Landscaping will be installed to help soften the look of the barrier and the sidewalk and act as a buffer in other areas. The approved colorsand materials being used on the exterior of the buildinghave not changed. The entries and entry features to the building have been shifted someto provide functionality for the tenant. The Hearing Officer asked the Target Express representative if there would be shopping cart corrals in the parking lot. He replied that there would not be any as the small carts used inside the store are designed to not be able to leave the store. The Hearing Officer addressed the concern about the truck loading bays. He explained that the site has a Master Use Permit and the truck traffic patterns and bay widths are not changing. The size of the trucks, delivery hours and noise were all studied and the conditions of approval were written to provide restrictions. The Target Express representative stated that the store location at this site would not be serviced by the large 18-wheel type trucks. He said, smaller ones, larger than box trucks, but smaller than the large commercial trucks, are all that is necessary. The Hearing Officer addressed the members of the audience regarding having a patio next to Stevens Creek Boulevard. He said that the patio at Panera is an example of a working patio. The materials and finishes proposed by Target Express were specifically chosen to soften the look and provide screening for the utility equipment there in order to make their patio area inviting. He hopes it succeeds and that patio becomes a place where people will want to hang out. He reminded the audience that the square footage of the building was not changing, that the truck routes and trash receptacles were governed by the conditions of the master Use Permit. The Building Code has requirements for the number of restrooms in a building and for accessibility. Those items are addressed during the plan review prior to issuance of the Tenant Improvement Building Permit. A Master Sign Program is currently under review by the project planner, Tiffany Brown. The sign program is approved in the Planning Department and does not have to go to a hearing. Staff member Brown will make sure that the Sign Program conforms to the City’s Sign Ordinance before approval. Photometric plans will also be submitted to the City for Staff approval of the site lighting prior to the issuance of the building permit. Staff member Brown has the plans, but has not approved them as yet. The Hearing Officer spoke about the transparency of glass along the store frontage on Stevens Creek Boulevard. He said that the City’s preference is to have clear glass so that people can see inside and be engaged with the business rather than having clouded or spandrel glass. That, in essence, serves a similar visual as a wall. Members of the audience interrupted the Hearing Officer to voice concerns about the glass. They cited other instances of stores that do not have 4 Administrative Hearing September 24, 2015 any glass in front, including the larger Target store further down on Stevens Creek. The Applicant addressed the audience to state that the part of the store that would be visible from the sidewalk would be the sales area and would be attractive to the passersby. The Hearing Officer concluded the discussion by concurring that the application was in conformance with the City’s Municipal and Building Codes. The store will be a welcome addition to the new retail center. DECISION: The application was approved by the Hearing Officer per the draft resolution with the following additions/modifications: Prior to granting final occupancy of the building, the style and design of the patio furniture needs approval; A Director’s approval would need to be obtained if the store decided that a change needed to be made (in the future) to allow shopping carts outside and into the parking lot; The colors of the metal features are to be a matte finish; Prior to issuance of the building permit, the applicant shall work with the City to ensure that the street level view of the store would be “desirable”and not cause lighting or glare issues to the pedestrians or motor vehicles going past. ADJOURNMENT Respectfully submitted: /s/Beth Ebben Beth Ebben Administrative Clerk g:planning/AHCommittee/Minutes092415 Cupertino, CA 95014 (408) 777-3308 ACTIONMINUTES OF THE REGULAR MEETING OF THE ADMINISTRATIVE HEARING HELD ON November 12,2015 ROLL CALL Hearing Officerpresent:Piu Ghosh, Senior Planner Staff present: Gian Martire, Assistant Planner Applicant(s)present:Jackson Derler (HMH Architects),Agent for the Property Owner APPROVAL OF MINUTES: None POSTPONEMENTS/REMOVAL FROM CALENDAR: None ORAL COMMUNICATION: None WRITTEN COMMUNICATIONS: None PUBLIC MEETING: 1.Application No.(s): ASA-2015-19, TR-2015-40 Applicant:Bob Farman(I & G Direct Real Estate) Location:10050 N Wolfe Rd APN #316-20-086 Architectural and Site approval to allow landscape and site improvements to the common area of an office building; Tree Removal Permit to allow the removal and replacement of 21 protected trees to facilitate landscape improvements in the common area of an office building Administrative Hearingdecision final unless appealed. 2 Administrative Hearing November 12, 2015 Staff Member Martire explained that the applicant,the Cupertino Financial Center, would like to make some much needed updates to the common areas of the center. In the courtyard of the center, they are proposing architectural changes thatinclude the addition of two large seating areas comprised of wooden decks with planters, the fountain will be replaced with a smaller water feature and a 1,000 square foot trellis-type structure with a built in multi-media feature to be used by employees and guests of the center. There 3,700 square feet of landscaping will be revamped for the installation of drought and water efficient plants and trees. At the front of the building, the applicant is proposing to replace 6,875 square feet of landscaping along the corner of the building where the art structure is currently located. The lawn area will be replaced with drought tolerant and native plantings. The Tree Removal Permit is to allow the removal of 21 ornamental trees in the courtyard area. They are not typically protected trees, but as they were installed as part of an approved landscape plan, they are considered protected. The trees proposed to be removed are 13 Honey Locust trees and 8 Kwanzan Cherry trees, all are small, ranging in size from 2.2 inches to 11 inches in diameter. The applicant has proposed 18 replacement trees consisting of 36 inch box fruitless olives trees. The Tree Ordinance requires replacements at a 2 to 1 ratio with 24” box trees. The applicant is replanting larger size trees than are required (which will count towards 15 replacement trees) and will be paying an in-lieu replacement fee for the remaining 3 trees. The draft resolution, condition 5, leaves room to approve the proposed tree replacement plan or require the applicant toreplant the 3 remaining trees. The Hearing Officer asked if the parking podium was below ground or at grade. The applicant’s architect replied that it was at grade. He went on to explain that the courtyard redesign was undertaken to keep the existing tenants happy and give the employees more flexibility with their work environment. The existing trees on site are mostly along the perimeter, so don’t provide shaded areas in which to sit. Currently there is a lot of concrete so walking between the buildingsis like walking in a parking lot. The applicant wants to bring in the larger trees and landscaping along with the seating features to create a more park-like setting. The Hearing Officer asked Staff member Martire about the public comments that had been received. He stated that the comments were by phone and that he had not received anything in writing. One person who commented was in attendance at the meeting. The Hearing Officer opened the public hearing to the resident in attendance. The resident, Jennifer Griffin, said that her initial concern about the removal of the Ash trees along the perimeter was in error. She walked the site and agrees that the courtyard area is in need of upgrading. She did have a concern about the grass being removed along thesidewalk by the inner row of Ash trees and in front of the building as people sit on the grass and wait for the bus and the corner has historically been viewed by the public as a park. She wanted this item continued for further evaluation. The Hearing Officer closed the public hearing. 3 Administrative Hearing November 12, 2015 She thenasked the applicant for clarification about where exactly the grass was proposed to be removed. The applicant reviewed the site plan. The grass and ivy along the front (in a small strip) and back to the bridge and the flowers near and around the art featurewill be replanted. The grass in the park strip will remain. It was pointed out that the area is not all grass currently and people are cutting through the grass and flower beds to pick up the sidewalk on the other side. This is creating a maintenance issue for the property owners. The applicant has designed an extension of the sidewalk to alleviate thatproblem. Along the north side, the grass in the front park strip is staying. The uphill area for about 60 feetwill be replanted. The existing planters near thewall will be replanted with native and drought tolerant plants. He explained that the new irrigation methods will better water the existing perimeter trees ensuring that they remain healthy. The arborist’sreport states that the trees in the courtyard are in decline due to where they are planted and/or because they are in planter boxes. The landscaping for the corner near the bridge will be native evergreen and deciduous grasses. The Hearing Officer asked if the applicant would consider keeping some of the grass along the frontage and add some plants around the public art feature to add some color. He said he was open to the ideas and would ask the property owners if they would also be willing to revise thelandscaping plan. The Hearing Officer also asked that they clarify on the plans the minor sidewalk extension. DECISION: The application was approved by the Hearing Officer per the draft resolution with the following additions/modifications: The turf area at the corner of N. Wolfe Road and Stevens Creek Boulevard shall be maintained in a width at least to match the width of the park strip. The area in front of the public art shall have native and/or droughttolerant plant additions that will addcolor; Condition 5 should be revised for the tree replacements to replace as many trees as possible as confirmed by the City’s Arborist. The indemnification clauses need to be updated with the current language. ADJOURNMENT Respectfully submitted: /s/Beth Ebben Beth Ebben Administrative Clerk g:planning/AHCommittee/Minutes111215 ADMINISTRATIVE HEARINGSTAFF REPORT Agenda Item No. Agenda Date:February 11, 2016 SUBJECT Architectural and Site application for approval for an approximately 189 square foot addition to an existing duplex. (Application No.(s): ASA-2015-27; Applicant: Frank Ho (Kuei residence); Location: 224466 Rancho Ventura Street; APN: 357-03-012) RECOMMENDATION Staff recommends that the Hearing Officer approvethe Architectural and Site Application (ASA-2015-27) per the draft resolution. PROJECT DATA: General Plan Designation Low/Medium Density Residential (5-10DU/Acre) Zoning Designation R2-4.25i Existing/Proposed Land Use Residential Duplex Lot Size 8,500 (0.19acres) Allowed/Required Proposed Lot Coverage (3,400 SF) Max. 40%(3,369 SF)39.6 % 1stFloor Setbacks Front 20’20’(no change) Rear*20’(20% of 100’lot depth)20’ (no change) Side(combined)17’(20% of width of lot at front setbacklineand not less than 6’) 8’-2’ –left side(no change) 13’ –right side(no change) Total Building Height Max. 30’13’-4”’(no change) Parking 3/DU (1 ½ enclosed + 1 ½ open)6 total (3inenclosed garage &3open) Project Consistency with: General Plan Yes Specific Plan Yes Environmental Review Categorically Exempt per Section 15303, Class 3 of the California Environmental Quality Act (CEQA), new construction or conversion of small structures OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE •CUPERTINO, CA 95014-3255 (408) 777-3308 • FAX (408) 777-3333 • planning@cupertino.org ASA-2015-27 22466 Rancho Ventura Street February 11, 2016 Page 2 BACKGROUND The proposed project is located along Rancho Ventura Street, east of the southeast intersection of Rancho Ventura Street and South Foothill Boulevard. The project is located in a duplex residential neighborhood with other residential duplexes to the north, south, east and west of the property. Surrounding these duplexes are single family homes,zoned R1-10, and R1-7.5. DISCUSSION The property owner, Tsao-Lin Kuei, is proposing a 189 square-foot addition comprised of a new master bedroom to one of the units in an existing duplex. The proposed addition is one-story. The existing duplex is 2,855 square foot home with a 679 square foot garage. The proposed addition would result in the garage becoming attached to the unit. According to Municipal Code Chapter 19.12 and Chapter 19.32, alterations to duplex buildings require an Architectural and Site Approval by the Director of Community Development or his/her designee at an Administrative Hearing in order to assure a high degree of architectural quality and to address other development issues. In order to achieve architectural consistency with the existing structure, the applicant proposes that the addition utilize existing roofline, composition shingle roofing, and exterior wall stucco finish to match the current structure.The applicant does not propose to remove any trees as a result of the addition.The proposal does not modify and continues to comply with the required setbacks, suitable visual massing, and maintain a building scale that is consistent with surrounding properties with similar use. Therefore, the proposal is harmonious in scale, architectural style, colors, and materials choice to the surrounding properties. The proposed addition to the residential duplex will not be detrimental or injurious to property or improvements in the surrounding area and will not be detrimental to the public health, safety, general welfare, or convenience because the improvements consist of an expansion of a residential use in a developed urban area. Further, the improvements are contained onsite and are substantially surrounded by the existing residential unit that will contain the residential expansion. The project is consistent with the General Plan, the underlying zoning standards of the R-2 Ordinance (i.e. lot coverage, setbacks, building height, etc.) as demonstrated in the Project Data above. SITE VICINITY AERIAL ASA-2015-27 22466 Rancho Ventura Street February 11, 2016 Page 3 OUTREACH/NOTICING The following table is a brief summary of the noticing done for this project: Notice of Public Meeting & Site Signage Agenda Posted on the site (10 days prior to hearing) 9 notices mailed to property owners adjacent to the project site (10 days prior to hearing) Posted on the City's official notice bulletin board (one weekprior to hearing) Posted on the City of Cupertino’s Web site (one weekprior to hearing) PERMIT STREAMLINING ACT This adjudicatory project subject to the Permit Streamlining Act (Government Code Section 65920 –65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received: November 24, 2015 Deemed Complete: December 22, 2015 Since this project is Categorically Exemptfrom the requirements of the California Environmental Quality Act (CEQA), the City has 60 daysto make a decision on the project. The Hearing Officer’s decision on this project is final unless appealed within 14 calendar days of the decision. CONCLUSION Staff recommends approval of the Architectural and Site Approval, since the plans and conditions of approval address all concerns related to the proposedproject. Additionally, all of the findingsfor approval of the proposed project, consistent with Chapter 19.168 of the Cupertino Municipal Code, may be madeas reflected in the Draft Resolution. Submittedby:Adam Petersen, SeniorPlanner Reviewed by:Catarina Kidd, Senior Planner Attachments DraftResolution Plan Set ASA-2015-27 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRAFT RESOLUTION OF THE ADMINISTRATIVE HEARING MEETINGOF THE CITY OF CUPERTINO FOR AN ARCHITECTURALAND SITE APPROVAL OFA189 SQUARE FOOT ADDITION TO AN EXISTING SINGLE-STORY DUPLEX LOCATED AT 22466 RANCHO VENTURA STREET. SECTION I: PROJECT DESCRIPTION Application No(s).: ASA-2015-27 Applicant(s):Frank Ho (Tsao-Lin Kueiresidence) Location:22466 Rancho Ventura Street (APN#357-03-012) SECTION II: FINDINGS WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an application to allow an Architectural and Site approval ofa 189square foot addition to an existing single- story duplex located on property zonedR2-4.25i; WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officerhas held at least one public meeting in regard to the application; and WHEREAS, the applicant has met the burden ofproof required to support said application; and WHEREAS, the Administrative Hearing Officerfinds: 1.The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The applicant is proposing to add 189square feet to anexisting duplex in order to add amaster bedroom to one of the units. The minor addition is designed to visually match the current structure and will be consistent to the form and land use of the surrounding properties. Therefore, the project is not detrimental to the public health, safety, general welfare or convenience. 2.The proposal is consistent with the purposes of Chapter 19.168, Architectural and Site Review, of the Cupertino Municipal Code, the General Plan, any specific plan, zoning Draft Resolution ASA-2015-27 February 11, 2016 Page 2 ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a)Abrupt changes in building scale should be avoided.A gradual transition related to height and bulk should be achieved between new and existing buildings; The proposal will not increase the existing building height of 13’-4.”Therefore the addition will avoid any abrupt changes to the scale of the structures on-site and on adjacent properties. b)In order to preserve design harmony between new and existing buildingsand in order to preserve and enhance property values, the materials, textures and colors of new buildings should harmonize with adjacent development by being consistent or compatible with design and color schemes, and,with the future character of the neighborhood and purposes of the zone in which they are situated.The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development.Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed.The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided.Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments, and provide shielding to prevent spill-over light to adjoining property owners; and The proposed architectural design, materials, finishes, and textures will matchthe existing building and are compatible with the character of the neighborhood.The project proposes nochanges to the location, height, and materials of walls,fencing,andhedges and screen planting. Exterior lighting other than that typicallyused in residential development is not being propose and nospill-over light uncommon in residential neighborhoodswill occur.Furthermore, theproposal has been designed to meet the R2Residential DuplexOrdinance and does not propose to locate unsightly storage, utility units, and/or parking lots visible to the public right-of-way. c)The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures shall minimize traffic hazards and shall positively affect the general appearance of the neighborhood and harmonize with adjacent development; and No signage or outdoor advertising is requestedthrough thisproposal. d)With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures The proposed addition is designed to protect residents from unnecessary noise, traffic, light, and visually intrusive effects by meetingthe required setbacks of the R-2 Zoning District. The existing landscaping will continue tominimize any such effects to adjacent properties. Draft Resolution ASA-2015-27 February 11, 2016 Page 3 NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated inSection III ofthis Resolution beginning on Page 3 thereof,the Application No. ASA-2015-27is hereby approved; andthat the sub-conclusionsupon which the findings and conditions specified in this Resolution are based and contained in the public meeting record concerning Application ASA-2015-27as set forth in the Minutes of the Administrative HearingMeeting of February11, 2016, and are incorporated by referenceas though fully set forthherein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1.APPROVED EXHIBITS Approval is based on the plan set entitled, “Construction Plans For: Bedroom and Garage Addition, 22466 Rancho Ventura Street, Cupertino CA.” dated “Received November 24, 2015”drawn by Studio 61, Architects, consisting of three (3) sheets labeled A1, A2, and A3, except as may be amended by conditions in this resolution. 2.ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the building plans. 3.ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 4.FENCES Any changes to the fencing shall require design review with the Community Development Departmentandshall comply with Cupertino Municipal Code Chapter 19.48: Fences 3.CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 4.EXTERIOR BUILDING MATERIALS/TREATMENTS Final building exterior treatment plan (including but not limited to details on exterior color, material, architectural treatments, lighting fixtures,and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The final building exterior plan shall closely resemble the details shown on the original approved plans. Any exterior changes determined to be substantial by the Draft Resolution ASA-2015-27 February 11, 2016 Page 4 Director of Community Development shall require a modification approval with neighborhood input. Prior to issuance of building permits, Staff will review exterior material such as doors and garage doors to ensure quality and consistency. 5.INDEMNIFICATION Except as otherwise prohibitedby law, the applicant shall indemnify and hold harmless the City, its City Council,andits officers, employees and agents (collectively,the “indemnified parties”) from and against any claim, action, or proceeding brought by a third party againstone or more of theindemnified partiesor one or more of the indemnified partiesand the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actualattorneys’ fees and costs incurred in defense of the litigation. Theapplicant shall paysuch attorneys’ fees and costswithin 30 daysfollowingreceipt of invoices from City. Suchattorneys’ fees and costsshall include amountspaid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 6.NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement ofthe amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 11thday of February, 2016at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST:APPROVED: Adam Petersen Piu Ghosh SeniorPlanner Principal Planner ADMINISTRATIVE HEARINGSTAFF REPORT Agenda Item No. Agenda Date:February 11,2016 SUBJECT Development Permit to allow the demolition of an existing commercial building and construct a new 2,500 square foot commercial building; Architectural and Site application to allow for a new 2,500 square foot commercial building and associated site improvements. (Application No.(s): DP-2015-03, ASA-2015-11; Applicant(s): Jeffrey Eaton (Uri Freeland); Location: 21731 Stevens Creek Boulevard; APN: 326-20-048) RECOMMENDATION: Staff recommends that the Director of Community Developmentapprove the Development Permit (DP-2015-03)and Architectural and Site Application(ASA-2015- 11)per the draftresolutions(Attachment 1). PROJECT DATA: General Plan Designation Neighborhood Commercial/Residential (Monta Vista Special Area) Zoning Designation [P (CN, ML, Res 4-12)] Planned Neighborhood Commercial, Light Industrial, and Residential with 4-12 dwelling units per gross acre Design Guidelines Monta Vista Design Guidelines Lot Size 25,600 sq. ft. (0.59acre) Existing use (to be demolished)Retail Building-1,610 sq. ft. Existing use (to remain)Retail Building -4,500 sq. ft. Proposed use:Retail Building -2,600 sq. ft. Total 7,100 sq. ft. Setbacks Required Provided Front:8 ft.min.10.9 ft. Side (west) No min.5.5 ft. OFFICE OFCOMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE •CUPERTINO, CA 95014-3255 (408) 777-3308 • FAX (408) 777-3333 DP-2015-03, ASA-2015-11 21731 Stevens Creek Boulevard February 11, 2016 Page 2 Side (east) No min.79 ft. Rear:No min.119 ft. Height 30 ft. max.26 ft. Auto Parking Required Provided Total:31stalls(1/250 sq. ft.)34stalls Bicycle parking 2 stalls 4 stalls Project Consistency With: General Plan Yes Zoning Yes Environmental Assessment Categorically Exempt (Section 15303) BACKGROUND: Previous City Approvals The project site at 21731 Stevens Creek Boulevardwas developed as two separate commercial buildings under Santa Clara County’s jurisdiction in the 1940s and was annexed into the City in 1980. There are no subsequent City approvals for development on the site. Existing Site and Surroundings The project site islocated within the Monta Vista Planning Districtat the northern side of Stevens Creek Boulevard, between Orange Avenue and the Southern Pacific Right of Way. The site isbounded byabuilding with commercialoffice usesto the west; the Cupertino Post Office to the east; mixed commercialand commercial office usesto the southacross Stevens Creek Boulevard; and single family residential usesto the north. DISCUSSION: Application Request The applicant, Jeffrey Eaton, representing the property owners, is requesting a Development Permit and an Architectural and Site Approval Permit for the demolition of the building located closest to Stevens Creek Boulevard on the siteand replacing it with a new 2,600 square foot building with associated site improvements. DP-2015-03, ASA-2015-11 21731 Stevens Creek Boulevard February 11, 2016 Page 3 The projectis being reviewedat an administrative hearing by the Director of Community Development. The Municipal Code establishes the Hearing Officer of the Administrative Hearing as the approval authority forminor Development Permitsand Architectural and Site Approval permits. Development Allocation The City does not have floor area ratio limitations for development on non-residential property and instead, has a Development Allocation system for managing development in the City. Currently, there is 5,647s.f. available in the Monta Vista Special Area allocation. The project is requesting an allocation of 990 square feet (2,600 –1,610 sq. ft.) of commercial space from the Monta Vista Planning Area Development Allocation pool. Therefore, a transfer of Development Allocation is not needed for this project and this proposed development fits within the allowed overall development in this Special area. After the allocation of the additional square footage to the site, this will leave a balance of 4,657 retail commercial square feet in the Monta Vista Planning Area. Site and Off-Site Improvements Site and off-site improvements proposed are summarized as follows: Improving two-waydriveway connection to the Stevens Creek siteand removing second (west) driveway to improve pedestrian safetyand walkability Installation of public sidewalk, landscaping, tree, and street furniture enhancements along the street frontage In front of Cupertino Post Office, installation of abulb out with ADA compliant curb ramp and stripingto improve bicycle traffic safety Improving design of parking lot in the eastern side of the new retail buildingto maximize parking capacity and to enhance efficiency,circulation,landscaping, onsite permeability, and pedestrian safety Provision of bicycle parking facilities Construction of a code-compliant detached trash enclosure Installation of pedestrian-scale lighting along walkways, building lights, and parking lot lighting throughout the project site Conformance to General Plan The project site iswithin the Monta VistaSpecialAreaidentified in the General Plan. The project conforms to the General Plan use, height,and density regulations. In addition, the project meets the following General Plan Policies: DP-2015-03, ASA-2015-11 21731 Stevens Creek Boulevard February 11, 2016 Page 4 Goal LU-25: Monta VistaVillage Retain and enhance Monta Vista Village’s small town character as a pedestrian-oriented, small scale, mixed-use residential, neighborhood commercial and industrial area The proposed retailbuilding is designed with the intent of neighborhood-serving commercial uses.The project is similar to other recently approved projects in Monta Vista.Adequate pedestrian and bicycle access is provided through public sidewalks along the street and walkways with a public access easement through the project site and bicycle parking alongthe public right-of-way. The project is also consistent with the Monta Vista Design Guidelines, explained later in the report. Strategy LU-25.3.1: Storefront Appearance Commercial and office buildings shall include a storefront appearance to the public street, and shall not be separated from the public sidewalk by extensive landscaping or changes in elevation. Office buildings shall be designed to accommodate future entrances from the sidewalk for future retail uses. The proposed building provides a storefront appearance along Stevens Creek Boulevard with pedestrian-oriented setbacks, entries, and storefront bays consistent with the Monta Vista Design Guidelines. Each tenant space has pedestrian entrances/access from the public sidewalk. Strategy LU-25.4.1: Interconnected Access Individual properties shall have interconnected pedestrian and vehicle access and shared parking. The project will provide interconnected pedestrian and vehicle access between the project site and the parcel to the west (21771 Stevens Creek Boulevard).The conditions of approval require areciprocal ingress/egress easements to be recorded on the propertyto continue theconnectionwith the adjoining site. The parking lot has also been designed to facilitate improvements with the shared driveway with the Cupertino Post Office and ensure fluid circulation between the sites. An ingress/egress easement already exists with the Cupertino Post Office. A shared parking agreement is not required since the project siteprovidesadequateparking onsite inconformance with the Parking Ordinance. Conformance to Monta Vista Design Guidelines The Monta Vista Design Guidelines provide development standards and design guidelines for various land uses in the Monta Vista Special Planning District. The project conforms to the Monta Vista Design Guidelines as follows: 7.C: Building Form:The design includesvertical and horizontal changes in the façades by the inclusion ofdormersand elevated window elements on the sides DP-2015-03, ASA-2015-11 21731 Stevens Creek Boulevard February 11, 2016 Page 5 which givestheproposed structure theappearance of a second story, and covered walkways. 6.C: Building Placement:The proposed building meetsthe specified setbacks in the guidelines. 7.A-G: Architectural Style& Materials:The Monta Vista Design Guidelines require buildings to have a rectilinear form with “Queen Anne” or “Victorian” embellishments. The proposed building is compatible in mass and scale with the predominant neighborhood pattern.The City’s Architectural Consultant has reviewed the building and supports the design. Specific comments from the architectural consultant have been addressed and incorporated into the proposed design to achieve consistency with City standards and enhance the aesthetic appearance. The proposed building architecture is consistent with the design guidelinesin that the proposed building materials, colors, and building forms complywith the standards recommended. However, acondition of approval has been added to modify the design so that the eaves on the west and east of the proposed building shall be equal inthe amount of overhang. As part of the same condition of approval, the applicant shall work with staff to replace the fabric awnings on the east elevation with architectural elements more durable and consistent with the Monta Vista guidelines. 8.A-I: Landscaping:Theproject proposeslandscaping that is consistent with the overall landscape characterof the design guidelines.Broad-crowned canopy trees are proposed to shade parking areas. Drought tolerant shrubs and ground covers have been added throughout the planting areas.Street trees are being planted at the required spacing with appropriate tree grates. 9.A: Street Sections:The project provides a public sidewalk to accommodate street trees consistent with the Monta Vista Design Guidelines. 10.A-E:Furniture, Fences & Accessories:The project provides street furniture along the street frontage of the proposed mixed use building, including a bench, trash receptacles, and bicycle parking.The proposed trash receptacles have beenreviewed by the City’sEnvironmental Programs divisionand the applicantis requiredto permanently install one set of waste trios (recycling, organics, and garbage) adjacent to the Stevens Creek Boulevard sidewalk prior to final occupancyin compliance with the City’s Municipal Code. DP-2015-03, ASA-2015-11 21731 Stevens Creek Boulevard February 11, 2016 Page 6 11.A-B: Signage: Signage is not being reviewed or approved for the site with this application. A separate sign program application will need to be reviewed and approved by the City. There are existing non-conforming signs on the site which will need to comply with the approved sign program upon approval. 12.A-B: Lighting:The project proposes new pedestrian-scale light polesto illuminate the public sidewalk, consistent with Monta Vista Design Guidelines. Low-level lighting is proposed in parking areas and along pedestrian walkways directed to preclude glare onto adjacent properties. 13.A: Trash Enclosure Screening:Anew trash enclosureis provided, consistent with the City’s Trash Enclosure Guidelines. Further, it has beendesigned and located to the satisfaction of the City’s Environmental Programs Manager and Recology. The proposed trash enclosurelocated in the rear of the proposed buildingfeatures decorative woodsidingwith an asphalt shingle roofin order to match with the proposed retail building. Circulation The project proposes to retain and improvethe existingtwo-way drivewaybetween the project site and the Cupertino Post Office.Reciprocal ingress/egress easements will be required for the project connectionwiththe property to the west(21771 Stevens Creek Boulevard.)The existing westdriveway toStevens Creek Boulevard will be eliminated. Though the west driveway is proposed to be eliminated, site circulation is not impacted since the parking lot has been designed to eliminate dead end parking stalls. Parking The parking provided on sitesatisfies the City’s parking requirements. Parking provided includes 34stallswhere only 31 are required. The future mix of businesses on the site will depend on the parking available to accommodate the projected demand based on the City’s Parking Ordinance. OTHER DEPARTMENT/AGENCY REVIEW The City’s Public Works Department; Building Division; the Santa Clara County Fire Department; Cupertino Sanitary District; and Recology reviewed the request andhave no objections to the project. Their pre-hearing comments have been incorporated as conditions of approval in the draft resolutions. DP-2015-03, ASA-2015-11 21731 Stevens Creek Boulevard February 11, 2016 Page 7 ENVIRONMENTAL ASSESSMENT The project is categorically exempt from the California Environmental Quality Act (CEQA) per section 15303 (New Construction) of the CEQA Guidelines because it applies to a commercial building not exceeding 10,000 square feet.In addition, a Phase I Environmental Site Assessment (ESA) was conducted for the property. The Phase I ESA concluded that no further environmental investigations are needed given that no recognized adverse environmental conditions were identified. PUBLIC NOTICING & OUTREACH The following table is a brief summary of the noticing done for this project: Notice of Public Hearing, Site Notice & Legal Ad Agenda Site Signage (14 days prior to the hearing) 33 notices mailed to property owners within 300 feet ofthe project site– 21731 Stevens Creek Boulevard (at least 10 days prior to the hearing) Posted on the City's officialnotice bulletin board (one week prior to the hearing) Posted on the City of Cupertino’s Web site (one week prior to the hearing) Neighborhood Meetingand Public Comments The applicant hosteda neighborhood meeting on January 21, 2016. Five residents attended the meeting, which was also attended by the property owner’s architectand real estate agent.City staff observed the meeting proceedings. A few of the residents inquired about potential traffic impacts, design, and construction mitigation. One comment has been received from the public regarding the adequacy of the proposed parking(See Attachment C). PERMIT STREAMLINING ACT This project is subject to the Permit Streamlining Act (Government Code Section 65920 – 65964). The City has compliedwith the deadlines found in the Permit Streamlining Act. Project Received: May 15, 2015 Deemed Incomplete: June 15, 2015and November 24, 2015 Deemed Complete:January 5, 2016 The City has 60 days (until March 5, 2016) to make a decision on the project since this project is Categorically Exempt from CEQA.The Director of Community Development’sdecision on this project is final unless appealed to the Planning Commissionwithin 14 calendar days of the decision. DP-2015-03, ASA-2015-11 21731 Stevens Creek Boulevard February 11, 2016 Page 8 CONCLUSION Staff recommends approval of the Development Permit, and Architectural and Site Approvalssince the plansand conditions of approval address all concerns related to the proposed project.Additionally, all of the findings for approval of the proposed project, consistent with Chapters19.156 and 19.168of the Cupertino Municipal Code, may be made. Submittedby:Gian Paolo Martire, AssistantPlanner Reviewed and Approved by: Adam Peterson, Senior Planner Attachments DraftResolutionDP-2015-03 Draft Resolution ASA-2015-11 Plan Set Public Comment DP-2015-03 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRAFT RESOLUTION OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO TO ALLOW THE DEMOLITION OF AN EXISTING COMMERCIAL BUILDING AND CONSTRUCT A NEW 2,500 SQUARE FOOT COMMERCIAL BUILDING AT 21731 STEVENS CREEK BOULEVARD SECTION I: PROJECT DESCRIPTION& RECITALS Application No.:DP-2015-03 Applicant:Jeffrey Eaton Property Owner:Uri Freeland Location:21731 Stevens Creek Boulevard (APN 326-20-048) Subject:Development Permit to allow the to allow the demolition of an existing commercial building and constructiona new 2,500 square foot commercial building. WHEREAS, the Administrative Hearing Officerof the City of Cupertino received an application for a Development Permitas described in Section I.of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officerheld a public meeting on February 11, 2016inregard to the application; and NOW, THEREFORE, BE IT RESOLVED: After careful consideration ofthe maps, facts, exhibits, testimony and other evidence submitted in this matter, the Administrative Hearing Officer hereby approves Application no. DP-2015-03based upon the findings described in Section II of this resolution, the public meeting record, and the minutes of the Administrative Hearing meeting of February 11, 2016, and subject to the conditions specified in Section III of this resolution. SECTION II: FINDINGS: 1.The proposed development and/or use, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The proposed retail buildingwill not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience because Draft Resolution DP-2015-03 February 11,2016 itislocated within a mixed use light industrial, neighborhood commercial, and residential district, which includes a variety of different land usessimilar to the one proposed. The City has approved othersimilar retail projectsin the neighborhood which is consistent with the City’s General Plan Goal LU-25for Monta VistaVillage. 2.The proposed development and/or use will be located and conducted in a manner in accord with the Cupertino Comprehensive General Plan, underlying zoning regulations, and the purpose of this title and complies with the California Environmental Quality Act (CEQA). The proposed commercialbuildingis consistent with the General Plan, zoning ordinance, and CEQA. For example, the project will be required to allow/provideconnections with adjoining sites (GP Strategy LU-25.4.1), provide a storefront appearance (GP Strategy LU-25.3.1),and provide an efficient and updated parking lot (GP Policy M-6.1). The conditions of approval contained in this resolution further reduce the likelihood of adverse impacts to surrounding properties. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1.APPROVEDEXHIBITS Approval is based on plan setsdated December 7, 2015, titled“Stevens Creek Retail Pad 21731 Stevens Creek Blvd., Cupertino, CA, 95014”,consisting of seventeensheets labeled PD0.1, PD1.0, PD1.1, PD2.1, PD2.2, PD3.0, PD3.1, 1-5, L1.0 –L4.0, and Lighting Plan Sheet 1 drawn by Eaton Hall Architecture,Hanna Brunetti Civil Engineers,and Gregory Lewis Landscape Architect, except as may be amended by conditions in this resolution. 2.ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3.ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 4.CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. ASA-2015-11 shall be applicable to this approval. 5.DEVELOPMENT APPROVALAND PROJECT AMENDMENTS Development Permitapprovalis granted to allow the demolition of an existing retail building and the construction of a 2,600square foot retailbuilding with commercial uses. Alloweduses include Neighborhood Commercial uses that serve primarily the residents of adjacent neighborhoods. This includes, but is not limited to, retail activities, personal services, and limited commercial and medical offices. Future uses will be determined using the City’s Draft Resolution DP-2015-03 February 11,2016 Parking Ordinance. A separate conditional use permit shall be required for commercial and office uses not considered neighborhood commercial by the Director of Community Development. Development intensity shall be regulated by conditional use permit review. The Director of Community Developmentshall review amendments to the project considered major. 6.DEVELOPMENT ALLOCATION The applicant shall receive an allocation of 990square feet of commercial allocation from the Monta Vista General Plan area. 7.BELOW MARKET RATE HOUSING PROGRAM MITIGATION FEES Prior to building permit issuance, the applicant shall provide the required housing mitigation fees for the retaildevelopment on the project site. The current fiscal year housing mitigation fees are $10 per square foot. Based on 990net new square feet of building area,$9,900in fees will be required. 8.INGRESS/EGRESS EASEMENTS Prior to final occupancy, the applicant shall record the necessary reciprocal ingress and egress easement between the adjoining property to the west to run in perpetuity. The easement shall contain a provision that it may not be modified without the prior express written approval of the City. The easement language shall be reviewed and approved by the City prior to recordation with the County Recorder’s Office. A financial deposit will be required for the City Attorney’s Office review time. 9.PUBLIC PEDESTRIAN ACCESS EASEMENT The property owner shall record an appropriate deed restriction, subject to approval of the City Attorney, for apublicpedestrianaccess easement through the interior pedestrian path(s). The easement shall be recorded prior to final occupancy of site permits. 10.PARKING LOT DIRECTIONAL SIGNAGE Prior to issuance of building permits, the applicant shall work with staff to consider the following parking lot directional signage to be installed prior to final occupancy: a.Speedbumps and/or speed limit signage b.Directional/informational signs c.Signage indicating “Exit Only” or “Do Not Enter” at the rear parking lot for the driveway at Imperial Avenue d.Transpose directional arrows on the parking lot surface 11.MAIN BUILDING ENTRANCE The main building entrance shall face Stevens Creek Boulevard. The entrance doors and storefront are to be kept open and free of any obstructions. No more than 25% of each storefront window bay maybe obstructed with signageor other interior items. Boarding, Draft Resolution DP-2015-03 February 11,2016 closure, shelves, permanent walls, opaque painting/materialof windows, and other storefront obstructionsarenot permitted. 12.SIGNAGE A sign program for the project site, including all existing buildings on the site,shall be reviewed and approved by the City prior to final occupancy.The sign program shall be consistent with the Monta Vista Design Guidelines. Refer to Section 19.104.130 of the Cupertino Municipal Code for the sign program requirements. 13.FINAL LIGHTING PLAN All new lighting must conform to thestandards in theParking Ordinance(Chapter 19.124) and General Commercial Ordinance (Chapter 19.60), and the final lighting plan (including a detailed photometric plan) shallbe reviewed and approved by the Community Development Director prior to building permit issuance. Prior to final occupancy, a licensed lighting consultant shall confirm that the lighting is in compliance with the City’s standards. 14.SCREENING All mechanical and other equipment on the building or on the site shall be screened so they are not visible from public street areas or adjoining developments. Screening materials/colors shall match building features and materials. The height of the screening shall be taller than the height of the mechanical equipment that it is designed to screen. The location of equipment and necessary screening shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. 15.TRANSFORMERS Electrical transformers, telephone cabinets and similar equipment shall be placed in underground vaults.The developer must receive written approval from both the Public Works Department and the Community Development Department prior to installation of any above ground equipment.Should above ground equipment be permitted by the City, equipment and enclosures shall be screened with fencing and landscaping such that said equipment is not visible from public street areas, as determined by the Community Development Department. Transformers shall not be located in the front or side building setback area. 16.LANDSCAPE PROJECT SUBMITTAL The applicant shall submit a full landscape project submittal,per sections 490.1, 492.1, and 492.3 of the Department of Water Resources Model Water Efficient Landscape Ordinance, for projectswith landscape area more than 500 square feet;the applicant shall submit either a full landscape project submittal or submit the Prescriptive Compliance Checklist per Appendix D of theDepartment of Water Resources Model Water Efficient Landscape Ordinance for projects with landscape area more than 500 square feet and less than 2,500 square feet. The Landscape Documentation Package or Prescriptive Compliance Checklist shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits. Draft Resolution DP-2015-03 February 11,2016 17.LANDSCAPE INSTALLATION REPORT A landscape installation audit shall be conducted by a certified landscape professional after the landscaping and irrigation system have been installed. The findings of the assessmentshall be consolidated into a landscape installation report. The landscape installation report shall include, but is not limited to: inspection to confirm that the landscaping and irrigation system are installed as specified in the landscape and irrigation design plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that causes overland flow, and preparation of an irrigation schedule. The landscape installation report shall include the following statement: “The landscape and irrigation system have been installed as specified in the landscape and irrigation design plan and complies with the criteria of the ordinance and the permit.” 18.LANDSCAPE AND IRRIGATION MAINTENANCE A maintenance schedule shall be established and submitted to the Director of Community Development or his/her designee, either with the landscape application package, with the landscape installation report, or any time before the landscape installation report is submitted. a.Schedules should take into account water requirements for the plant establishment period and water requirements for established landscapes. b.Maintenance shall include, but not be limited to the following: routine inspection; pressure testing, adjustment and repair of the irrigation system; aerating and de-thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of failed plants; weeding; pest control; and removing obstructions to emission devices. c.Failed plants shall be replaced with the same or functionally equivalent plants that may be size-adjusted as appropriate for the stage of growth of the overall installation. Failing plants shall either be replaced or be revived through appropriate adjustments in water, nutrients, pest control or other factors as recommended by a landscaping professional. 19.TRASH AND DELIVERY ACTIVITIES A detailed refuse and truck delivery plan shall be prepared by the applicantprior to issuance of building permits. The plan shall include, but not be limited to the following: a.Location and design oftrash facilities (i.e. trash enclosures and receptacles). Trash enclosures shall provide ample space to include trash, recycling, food waste, and waste receptacles along with a tallow bin. b.Quantity of trash receptacles. c.Primary and alternative truck routes. d.Signage for parking stalls displaced during pick-up and delivery hours (if applicable). e.Trash pick-up schedule(shall not take place during peak business hours) f.Loading areas (with signage/markings restricting parking in these areas during loading times) g.Delivery hours (shall not take place during peak business hours) Draft Resolution DP-2015-03 February 11,2016 All trash facilities must be screened and enclosed to the satisfaction of the Public Works Department. The final plan shall be submitted to the City and the City’s refuse service for review and approval prior to issuance of building permits. 20.CONSTRUCTION HOURS Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on holidays.All construction shall occur in compliance with Chapter 10.48, Community Noise Control, of the Cupertino Municipal Code. The developer shall be responsible for educating all contractors and subcontractors of said construction restrictions. Rules and regulation pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of a developer appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. 21.DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to issuance of final demolition permits. 22.DUST CONTROL The following construction practices shall be implemented during all phases of construction for the proposed project to prevent visible dust emissions from leaving the site: a.Water all active construction areas at least twice daily andmore often during windy periods to prevent visible dust from leaving the site; active areas adjacent to windy periods; active areas adjacent to existing land uses shall be kept damp at all times, or shall be treated with non-toxic stabilizers or dust palliatives. b.Cover all trucks hauling soil, sand, and other loose materials or require all trucks to maintain at least 2 feet of freeboard; c.Pave, apply water at least three times daily, or apply (non-toxic) soil stabilizers on all unpaved access roads, parkingareas and staging areas at construction sites. d.Sweep streets daily, or more often if necessary (preferably with water sweepers) if visible soil material is carried onto adjacent public streets. e.The applicant shall incorporate the City’s construction best management practices into the building permit plan set. 23.NOISE MITIGATION MEASURES The project and retail operations shall comply with the City’s Community Noise Control Ordinance (Chapter 10.48 of the CMC). In addition, the following mitigation measures shall be taken in order to reduce noise event impacts to nearby receptor areas: a.The contractor shall use “new technology” power construction equipment with state-of- the-art noise shielding and muffling devices. All internal combustion engines used on the project site shall be equipped with adequate mufflers and shall be in good mechanical Draft Resolution DP-2015-03 February 11,2016 condition to minimize noise created by faulty or poor maintained engines or other components. b.Locate stationary noise generating equipment as far as possible from sensitive receptors. Staging areas shall be located a minimum of 200 feet from noise sensitive receptors, such as residential uses. Unnecessary idling of machines when not in use shall be prohibited. c.The developer will implement a Construction Management Plan approved by the Community Development Director and Director of Public Works to minimize impacts on the surrounding sensitive land uses to the fullest extent possible. d.Temporary plywood enclosures shall be erected around stationary equipment that produces excessive noise at nearby receptors e.Good maintenance and lubrication procedures shall be used to reduce operating noise. f.All construction equipment shall conform to the following standards: 1) no individual device produces a noise level more than 87 dBA at adistance of 25 feet; or 2) the noise level on any nearby property does not exceed eighty dBA (Cupertino Municipal Code Section 10.48.053). g.Equip all internal combustion engine driven equipment with intake and exhaust mufflers that are in good condition and appropriate for the equipment. h.Noise from construction workers’ radios shall be controlled to a point that it is not audible at existing residences bordering the project site. i.Notify all adjacent businesses, residences, and other noise-sensitive land uses of the construction schedule in writing. 24.ROOFTOP EQUIPMENT SCREENING All mechanical and other equipment on the building shall be screened so they are not visible from public street areas or adjoining developments. The height of the screening shall be taller than the height of the mechanical equipment that it is designed to screen. A line of sight plan may be required to demonstrate that the equipment will not be visible from any public right- of-way. The location of the equipment and necessary screeningshall be reviewed and approved by the Director of Community Development prior to issuance of building permits. 25.UTILITY STRUCTURE PLAN Prior to issuance of building permits, the applicant shall work with staff to provide a detailed utility plan to demonstrate screening or undergrounding of all new utility structures [including, but not limited to backflow preventers (BFP), fire department connections (FDC), post-indicator valves (PIV), and gas meters] to the satisfaction of the Director of Community Development, Public Works, Fire Department, and applicable utility agencies. 26.PRE-CONSTRUCTION MEETING AND CONSTRUCTION MANAGEMENT PLAN Prior to commencement of construction activities, the applicant shall arrange for a pre-construction meeting with the pertinent departments (including, but not limited to, Building, Planning, Public Works, Santa Clara County Fire Department) to review an applicant-prepared construction management plan including, but not limited to: a.Plan for compliance with conditions of approval b.Plan for public access during work in the public right-of-way Draft Resolution DP-2015-03 February 11,2016 c.Construction staging area d.Construction schedule and hours e.Construction phasing plan, if any f.Contractor parking area g.Tree preservation/protection plan h.Site dust, noise and storm run-off management plan i.Emergency/complaint and construction site manager contacts 27.CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 28.INDEMNIFICATION Except as otherwise prohibitedby law, the applicant shall indemnify and hold harmless the City, its City Council,andits officers, employees and agents (collectively,the “indemnified parties”) from and against any claim, action, or proceeding brought by a third party againstone or more of theindemnified partiesor one or more of the indemnified partiesand the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actualattorneys’ fees and costs incurred in defense of the litigation. Theapplicant shall paysuch attorneys’ fees and costswithin 30 daysfollowingreceipt of invoices from City. Suchattorneys’ fees and costsshall include amountspaid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 29.NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protestwithin this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT 30.DRAINAGE AGREEMENT Provide to the Cityeither a mutual agreement or an easement document that shows the project site has the necessary permissions to drain through the adjacent property, or provide an alternative path that directs onsite drainage to the public right of way. 31.STREET IMPROVEMENTS Public street widening and dedications shall be provided in accordance with City Standards and specifications and as required by the City Engineer. The Developer shall construct street improvements Draft Resolution DP-2015-03 February 11,2016 on the north side of Stevens Creek Blvd between the PostOffice mail drop aisle, and the shared driveway between the subject property and the Post Office property. Improvements shall include narrowing the paved street to remove the right turn lane, and associated striping. The new curb and gutter along the property frontage shall continue in a straight line from the existing curb and gutter to the West, until it lines up with the proposed new curb and gutter improvements to the East (between the mail drop aisle and the shared driveway). The in-pavement lighted crosswalk and associated hardware shall be modified as necessary to accommodate the improvements. The Developer shall dedicate to the City any private land within 10’ of the new face of curb. All improvements in the right of way shall be done to the satisfaction of the City Engineer. 32.CURB AND GUTTER IMPROVEMENTS Curbs and gutters, sidewalks and related structures shall be installed in accordance with grades and standards as specified by the City Engineer. 33.PEDESTRIAN AND BICYCLE IMPROVEMENTS Developer shall provide pedestrian and bicycle related improvements consistent with the Cupertino Bicycle Transportation Plan and the Pedestrian Transportation Guidelines, and as approved by the City Engineer. 34.BICYCLE PARKING Developer shall provide bicycle parking consistent with the City’s requirements to the satisfaction of the City Engineer. 35.STREET LIGHTING INSTALLATION Street lighting shall be installed and shall be as approved by the City Engineer. Lighting fixtures shall be positioned so as to preclude glare and other forms of visual interference to adjoining properties, and shall be no higher than the maximum height permitted by the zone in which the site is located. 36.UNDERGROUND UTILITIES Developer shall comply with the requirements of the Underground UtilitiesOrdinance No. 331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate with affected utility providers for installation of underground utility devices. Developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the City Engineer. 37.TRANSFORMERS Electrical transformers, telephone cabinets and similar equipment shall be placed in underground vaults. The developer must receive written approval from both the Public Works Department and the Community Development Department prior to installation of any above ground equipment. Should above ground equipment be permitted by the City, equipment and enclosures shall be screenedwith fencing and landscaping such that said equipment is not visible from public street areas, as determined by the Community Development Department. Transformers shall not be located in the front or side building setback area. 38.WATER BACKFLOW PREVENTERS Draft Resolution DP-2015-03 February 11,2016 Domestic and Fire Water Backflow preventers and similar above ground equipment shall be placed away from the public right of way and site driveways to a location approved by the Cupertino Planning Department, Santa Clara County Fire Department and the water company. 39.IMPROVEMENT AGREEMENT The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for under grounding of utilities. Said agreement shall be executed prior to issuance of construction permits Fees: a. Checking & Inspection Fees:$ Per current fee schedule ($4,498.00 or 6%) b. Grading Permit: $ Per current fee schedule ($2,618.00 or 6%) c. Development Maintenance Deposit:$ 1,000.00 d. Storm Drainage Fee:$ 5,282.00 +/- e. Power Cost:** f. Map Checking Fees:$ Per current fee schedule (N/A) g. Park Fees:$ Per current fee schedule (N/A) h. Street Tree $348.00 per tree **Based on the latest effective PG&E rate schedule approved by the PUC Bonds: Faithful Performance Bond: 100% of Off-site and On-site Improvements Labor & Material Bond: 100% of Off-site and On-site Improvement On-site Grading Bond: 100% of site improvements. -The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. 40.GRADING Grading shall be as approved and required by the City Engineer in accordance with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits maybe required. Please contact Army Corp of Engineers and/or Regional Water Quality Control Board as appropriate. 41.DRAINAGE Drainage shall be provided to the satisfaction of the City Engineer. Hydrology and pre-and post-development hydraulic calculations must be provided to indicate whether additional storm water control measures are to be constructed or renovated. The storm drain system may include, but is not limited to, subsurface storage of peak stormwater flows (as needed), bioretention basins, vegetated swales, and hydrodynamic separators to reduce the amount of Draft Resolution DP-2015-03 February 11,2016 runoff from the site and improve water quality. The storm drain system shall be designed to detain water on-site (e.g., via buried pipes, retention systems or other approved systems and improvements) as necessary to avoid an increase of the ten percent flood water surface elevation to the satisfaction of the City Engineer. Any storm water overflows or surface sheeting should be directed away from neighboring private properties andto the public right of way as much as reasonably possible. 42.C.3 REQUIREMENTS C.3 regulated improvements are required for all projects creating and/or replacing 5,000 S.F. or more of impervious surface (collectively over the entire project site). The developer shall reserve a minimum of 4% of developable surface area for the placement of low impact development measures, for storm water treatment, on the tentative map, unless an alternative storm water treatment plan, that satisfies C.3 requirements, is approved by the City Engineer. The applicantmust include the use and maintenance of site design, source control and storm water treatment Best Management Practices (BMPs), which must be designed per approved numeric sizing criteria. A Storm Water ManagementPlan, Storm Water Facilities Easement Agreement, Storm Water Facilities Operation and Maintenance Agreement, and certification of ongoing operation and maintenance of treatment BMPs are each required. All storm water management plans are required to obtain certification from a City approved third party reviewer. 43.FULL TRASH CAPTURE SYSTEM The applicantwill be responsible for installing a full trash capture system/device to capture trash from the onsite storm drain before the storm water reaches the City owned storm drain system. A full capture system or device is a single device or series of devices that traps all particles retained by a 5 mm mesh screen and has a design treatment capacity of not less than the peak flow rate Q resulting from a one-year, one-hour storm in the sub-drainage area (see the Municipal Regional Permit section C.10 for further information/requirements). 44.BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMPs), as required by the State Water Resources Control Board, forconstruction activity, which disturbs soil. BMP plans shall be included in grading and street improvement plans. 45.NPDES CONSTRUCTION GENERAL PERMIT When and where it is required by the State Water Resources Control Board (SWRCB), the developer must obtain a Notice of Intent (NOI) from the SWRCB, which encompasses preparation of a Storm Water Pollution Prevention Plan (SWPPP), use of construction Best Management Practices (BMPs) to control storm water runoff quality, and BMP inspection and maintenance. Draft Resolution DP-2015-03 February 11,2016 46.EROSION CONTROL PLAN Developer must provide an approved erosion control plan by a Registered Civil Engineer. This plan should include all erosion control measures used to retain materials on site. Erosion control notes shall be stated on the plans 47.WORK SCHEDULE Every 6 months, the developer shall submit a work schedule to the City to show the timetable for all grading/erosion control work in conjunction with this project. 48.OPERATIONS & MAINTENANCE AGREEMENT Applicantshall enter into an Operations & Maintenance Agreement with the City prior to final occupancy, as needed. The Agreement shall include the operation and maintenance for non- standard appurtenances in the public road right-of-way that may include, but is not limited to, sidewalk, pavers, and street lights. 49.TRAFFIC SIGNS Traffic control signs shall be placed at locations specified by the City. 50.TRASH, RECYCLING AND COMPOST RECEPTACLES The applicantis required to install public bins (~30 gal) side-by-side for trash, recycling and composting, adjacent to the development to control pedestrian litter at the site.The type and location of the receptacles are subject to the approval of the Environmental Programs Manager. (CMC 9.18.210 P) 51.TRASH, RECYCLING AND COMPOST ENCLOSURES Trash enclosure plans mustbe designed in accordance with the City’s “Public Works Guidelines for Non-Residential Building Trash & Recycling Enclosures” posted at www.cupertino.org/nowaste, and to the satisfaction of the Environmental Programs Manager. Modifications to existing facilities shall, to the maximum extent practicable, meet the Public Works Guidelines and shall be subject to the approval of the Public Works Director. Clearance by the Public Works Department is required prior to obtaining a building permit. (CMC 9.18.210 H & K) 52.REFUSE TRUCK ACCESS Applicantmust obtain clearance from the Environmental Programs Manager in regards to refuse truck access for the proposed development and trash, recycling and compost enclosures. Plans for access must be reviewed and approved by the City’s franchised refuse collector. 53.STREET TREES Street trees shall be planted within the Public Right of Way to the satisfaction of the City Engineer and shall be of a type approved by the City in accordance with Ordinance No. 125. 54.FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City. Draft Resolution DP-2015-03 February 11,2016 55.SANTA CLARA COUNTY FIRE DEPARTMENT A letter of clearance for the project shall be obtained from the Santa Clara County Fire Department prior to issuance of building permits. Clearance should include written approval of the location of any proposed Fire Backflow Preventers, Fire Department Connections and Fire Hydrants (typically Backflow Preventers should be located on private property adjacent to the public right of way, and fire department connections must be located within 100’ of a Fire Hydrant). 56.FIRE HYDRANT Fire hydrants shall be located as required by the City and Santa Clara County Fire Department as needed. 57.SAN JOSE WATER COMPANY CLEARANCE Provide San Jose Water Company approval for water connection, service capability and location and layout of water lines and backflow preventers before issuance of a building permit approval. 58.DEDICATION OF WATERLINES Developer shall dedicate to the City all waterlines and appurtenances installed to City Standards and shall reach an agreement with San Jose Water Company for water service to the subject development. 59.DEDICATION OF UNDERGROUND WATER RIGHTS Developer shall “quit claim” to the City all rights to pump, take or otherwise extract water from the underground basin or any underground strata in the Santa Clara Valley. 60.SANITARY DISTRICT A letter of clearance for the project shall be obtained from the Cupertino Sanitary District prior to issuance of building permits. 61.UTILITY EASEMENTS Clearance approvals from the agencies with easements on the property (including PG&E, AT&T, and California Water Company, and/or equivalent agencies) will be required prior to issuance of building permits. SECTION V: CONDITIONS ADMINISTERED BY THE SANTA CLARA COUNTY FIRE DEPARTMENT 62.FIRE DEPARTMENT REVIEW Review of this development proposal is limited to acceptability of site access and water supply as they pertain to fire department operations, and shall not be construed as a substitute for formal plan review to determine compliance with adopted model codes. Prior to performing Draft Resolution DP-2015-03 February 11,2016 any work, the applicant shall make application to, and receive from, the Building Department, all applicable construction permits. 63.FIRE SPRINKLERS REQUIRED Where required. Approved automatic sprinkler systems in new and existing buildings and structuresshall be provided in the locations described in this Section or in Sections 903.2.1 through 903.2.18 whichever is more restrictive. For the purpose of this section, firewalls used to separate building areas shall be constructed in accordance with the California Building Code and shall be without openings or penetrations. 1. In other than residential buildings which require the installation of fire sprinklers for all new buildings according to the California Residential Code, an automatic sprinkler system shall be provided throughout all new buildings and structures.Exception: a. Buildings and structures that do not exceed 1,000 square feet of building area and that are not located in the Wild-Urban Interface Fire Area. B. Buildings and Structures that are located in the Wild-Urban Interface Fire Area and do not exceed 500 square feet of building area. NOTE: The owner(s), occupant(s), and any contractor(s) or subcontractor(s) are responsible for consulting with the water purveyor of record in order to determine if any modification or upgrade of the existing water service is required. A State of California licensed (C-16) Fire Protection Contractor shall submit plans, calculations, a completed permit application and appropriate fees to this department for review and approval prior to beginning their work. Sections 903.2as adopted and amended by CUPMC. 64.WATER SUPPLY REQUIREMENTS Potablewater supplies shall be protected from contamination caused by fire protection water supplies. It is the responsibility of the applicant and any contractors and subcontractors to contact the water purveyor supplying the site of such project, and to complywith the requirements of that purveyor. Such requirements shall be incorporated into the design of any water-based fire protection system, and/or fire suppression water supply systems or storage containers that may be physically connected in any manner toan appliance capable of causing contamination of the potable water supply of the purveyor of record. Final approval of the system(s) under consideration will not be granted by this office until compliance with the requirements of the water purveyor of record are documented by that purveyor as having been met by the applicant(s). 2010 CFC Sec. 903.3.5 and Health and Safety Code 13114.7. 65.ADDRESS IDENTIFICATION New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. Where required by the fire code official, address numbers shall be provided in additional approved locations to facilitate emergency response. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall be a minimum of 4 inches (101.6 mm) high with a minimum stroke width of .5 inch Draft Resolution DP-2015-03 February 11,2016 66.CONSTRUCTION SITE FIRE SAFETY All construction sites must comply with applicable provisions of the CFC Chapter 33 and our Standard Detail and Specification SI-7.Provide appropriate notations on subsequent plan submittals, as appropriate to the project. CFC Chp.33. SECTION VI: CONDITIONS ADMINISTERED BY THE CUPERTINO SANITARY DISTRICT 67.PROPERTY LINE CLEANOUT Install new property line cleanout or locate and raise to grade an existing property line cleanout.Property line cleanout must be within five feet of the property line. Cleanout shall be the same diameter as the street portion of the service lateral. Gravity lateral is 4” diameter minimum. 68.IMPROVEMENT PLANS On-site and off-site improvement plans shall be submitted to the District for review and comments. 69.FEES AND PERMITS Cupertino Sanitary Districtfees and permits shall be required for the subject application based on the proposed area and use modifications. SECTION VII: CEQA REVIEW This DevelopmentPermit is categorically exempt from the California Environmental Quality Act (CEQA) per section 15303 (New Construction) of the CEQA Guidelines because it applies to a mixed residential and commercial building and site improvements not exceeded 10,000 square feet. PASSED AND ADOPTED this 11th day of February, 2016 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST:APPROVED: Draft Resolution DP-2015-03 February 11,2016 ______ Gian Paolo Martire Piu Ghosh AssistantPlanner PrincipalPlanner ASA-2015-11 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRAFT RESOLUTION OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO TO ALLOW AN ARCHITECTURAL ANDSITE APPROVAL PERMITFOR THE CONSTRUCTION OF ANEW 2,500 SQUARE FOOT COMMERCIAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS AT 21731 STEVENS CREEK BOULEVARD SECTION I: PROJECT DESCRIPTION& RECITALS Application No.:ASA-2015-11 Applicant:Jeffrey Eaton Property Owner:Uri Freeland Location:21731 Stevens Creek Boulevard (APN 326-20-048) Subject:Architectural and Site Approvalfor a new 2,500 square foot commercial building and associated site improvements. SECTION II: WHEREAS, the Administrative Hearing Officerof the City of Cupertino received an application for an Architectural and Site Approval permit as described in Section I.of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officerheld a public meeting on February 11, 2016inregard to the application; and WHEREAS, the project is categorically exempt under the California Environmental Quality Act; NOW, THEREFORE, BE IT RESOLVED: After careful consideration ofthe maps, facts, exhibits, testimony and other evidence submitted in this matter, the Administrative Hearing Officer hereby approves Application no. ASA-2015-11based upon the findings described in Section II of this resolution, the public meeting record, and the minutes of the Administrative Hearing meeting of February 11, 2016, and subject to the conditions specified in Section IVof this resolution. Draft Resolution ASA-2015-11 February 11,2016 SECTION III: FINDINGS: 1.The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The proposed retailbuilding will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience because it is located within a mixed use light industrial, neighborhood commercial, and residential district, which includes a variety of different land uses similar to the one proposed. The City has approved other similar retailprojects in the neighborhood which is consistent with the City’s General Plan Goal LU-25 for Monta VistaVillage. 2.The proposal is consistent with the purposes of Chapter 19.168, Architectural and Site Review, of the Cupertino Municipal Code, the General Plan, any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a)Abrupt changes in building scale have been avoided. A gradual transition related to height and bulk has been achieved between new and existing buildings. The project is compatible with the scale of the surrounding buildings and streetscape in terms of height, bulk, and form. The building design and height are consistent with the Monta Vista Design Guidelines. b)Design harmony between new and existing buildings have been preserved and the materials, textures and colors of new buildings harmonize with adjacent development with design and color schemes, and with the future character of the neighborhood and purposes of the zone in which it is situated. The location, height and materials of walls, fencing, hedges and screen planting harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots have been concealed. Ground cover or various types of pavements have been used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees have been avoided. Lighting for development is adequate to meet safety requirements as specified by the engineering and building departments, and shielding to adjoining property owners. The project is harmonious with the existing buildings and streetscape in the Monta Vista Planning District. The design is also consistent with the Monta Vista Design Guidelines. No newretaining walls are proposed for the project. All above ground utility installations are required to be screened from public view. The design has incorporated landscaping, as well as lighting to illuminate pedestrian paths and vehicular routes, which will not glare onto adjoining properties. c)The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. Draft Resolution ASA-2015-11 February 11,2016 No exterior signage is approved as part of this application.Project signage, if any, is required to adhere to the City’s Sign Ordinanceand the Monta Vista Design Guidelines. Parking lot directional signage will be reviewed and approved by City staff prior to building permit issuance. d)Thisnew development, abutting an existing residential development, has been designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. The project is designed to protect residents from noise, traffic, light, and visually intrusive effects by use of buffering, setbacks, and landscaping. The project has been designed to mitigate any potentially intrusive effects to the surrounding area. SECTION IV: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1.APPROVED EXHIBITS Approval is based on plan sets dated December 7, 2015, titled “Stevens Creek Retail Pad 21731 Stevens Creek Blvd., Cupertino, CA, 95014”, consisting of seventeen sheets labeled PD0.1, PD1.0, PD1.1, PD2.1, PD2.2, PD3.0, PD3.1, 1-5, L1.0 –L4.0, and Lighting Plan Sheet 1 drawn by Eaton Hall Architecture, Hanna Brunetti Civil Engineers, and Gregory Lewis Landscape Architect, except as may be amended by conditions in this resolution. 2.ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3.ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 4.CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file nos. DP-2015-03shall be applicable to this approval. 5.ARCHITECTURAL MODIFICATION Applicant shall amend thedesign of the proposed building by: a.Redesigning the eaves on the west and east of theproposed building tobe equal in the amount of overhang. b.Eliminating the fabric awnings on the east elevation and working with staff to consider alternatives that conform to the Monta Vista Design Guidelines. 6.FINAL BUILDINGDESIGN The final building design and exterior treatment plans shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The Director of Draft Resolution ASA-2015-11 February 11,2016 Community Development may approve additional designs or makeminorvariations as deemed appropriate.The final building exterior plan shall closely resemble the details shown on the original approved plans. Any exterior changes determined to be substantial by the Director of Community Development shall require a modification approval. 7.CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 8.INDEMNIFICATION Except as otherwise prohibitedby law, the applicant shall indemnify and hold harmless the City, its City Council,andits officers, employees and agents (collectively,the “indemnified parties”) from and against any claim, action, or proceeding brought by a third party againstone or more of theindemnified partiesor one or more of the indemnified partiesand the applicant to attack, set aside, or voidthis Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actualattorneys’ fees and costs incurred in defense of the litigation. Theapplicant shall paysuch attorneys’ fees and costswithin 30 daysfollowingreceipt of invoices from City. Suchattorneys’ fees and costsshall include amountspaid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 9.NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION V: CEQA REVIEW This Architectural and Site Approval permitis categorically exempt from the California Environmental Quality Act (CEQA) per section 15303(New Construction) of the CEQA Guidelines because it applies to a mixed residential and commercial building and site improvements not exceeded 10,000 square feet. Draft Resolution ASA-2015-11 February 11,2016 PASSED AND ADOPTED this 11th day of February, 2016 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST:APPROVED: Gian Paolo Martire Piu Ghosh AssistantPlanner PrincipalPlanner OW N E R : AR C H I T E C T : CI V I L EN G I N E E R : LA N D S C A P E AR C H I T E C T : UR I F R E E L A N D 11 0 0 S E E N A A V E N U E LO S A L T O S , C A 9 4 0 2 4 e- m a i l : f r e e u r i @ y a h o o . c o m EA T O N H A L L A R C H I T E C T U R E 15 0 1 T H E A L A M E D A , S U I T E 1 0 5 SA N J O S E , C A 9 5 1 2 6 JE F F R E Y E . E A T O N , A I A (4 0 8 ) 2 6 5 - 5 2 5 5 (4 0 8 ) 2 6 5 - 6 1 5 5 F A X e- m a i l : j e f f r e y @ e h a s t u d i o . c o m GR E G O R Y L E W I S L A N D S C A P E A R C H I T E C T #2 1 7 6 , 7 3 6 P A R K W A Y SA N T A C R U Z , C A 9 5 0 6 5 GR E G O R Y L E W I S (8 3 1 ) 4 2 5 - 4 7 4 7 e- m a i l : l e w i s l a n d s c a p e @ s b c g l o b a l . n e t HA N N A - B R U N E T T I 76 5 1 E I G L E B E R R Y S T . GI L R O Y , C A 9 5 0 2 0 - 5 1 2 2 AM A N D A W I L S O N P . E . PH : ( 4 0 8 ) 8 4 2 - 2 1 7 3 FA X : ( 4 0 8 ) 8 4 2 - 3 6 6 2 e- m a i l : a w i l s o n @ h a n n a b r u n e t t i . c o m BU I L D I N G A ( E X I S T I N G ) 4, 5 0 0 S F 12 09 06 06 BU I L D I N G B TO B E D E M O L I S H E D 1, 6 1 0 S F 13 4 . 4 2 ' 179.99' 10 8 . 4 2 ' 200.00' SITE STEVENS CREEK BLVD85PASADENA AVE.MANN DR.NE T ASCLIEO OETFFILACEXP. 5/17JNRIAHNORCSEDYC 26469ERFFAEE.TAETI TCEATONHALLARCHITECTURE Project Number:Date: © 2 0 1 5 E a t o n H a l l A r c h i t e c t u r e , I n c . 1501 The Alameda, Ste 105 San Jose, CA   95126 TEL408.265.5255 FAX408.265.6155 A CALIFORNIA CORPORATION Sheet Title:CLIENT:Drawn by:Checked by:PD0.1GENERALINFORMATIONSTEVENS CREEK RETAIL PAD 21731 STEVENS CREEK BLVD. CUPERTINO, CA 95014URI FREELAND 12/7/20153.635 SD JE PR O J E C T D I R E C T O R Y SH E E T I N D E X GENERAL INFORMATION PREVAILING CODES CI V I L 01 o f 0 5 C O V E R S H E E T 02 o f 0 5 C I T Y G E N E R A L N O T E S & D E T A I L S 03 o f 0 5 P R E L I M I N A R Y G R A D I N G & D R A I N A G E P L A N 04 o f 0 5 S T O R M W A T E R M A N A G E M E N T P L A N 05 o f 0 5 E R O S I O N C O N T R O L P L A N APPROVALS PRIOR APPROVALS DEFERRED APPROVALSVICINITY MAP LA N D S C A P E A R C H I T E C T U R E L1 . 0 P L A N T I N G P L A N L2 . 0 I R R I G A T I O N P L A N L3 . 0 L A N D S C A P E D E T A I L S L4 . 0 L A N D S C A P E S P E C I F I C A T I O N PL A N N I N G PD 0 . 1 G E N E R A L I N F O R M A T I O N PD 1 . 0 S I T E P L A N & S I T E A C C E S S I B I L I T Y PD 1 . 1 S I T E D E T A I L S PD 2 . 1 P R O P O S E D F I R S T F L O O R P L A N PD 2 . 2 P R O P O S E D R O O F P L A N PD 3 . 0 E X I S T I N G E L E V A T I O N S PD 3 . 1 P R O P O S E D E L E V A T I O N S ST E V E N S C R E E K R E T A I L P A D 21 7 3 1 S T E V E N S C R E E K B L V D . CU P E R T I N O , C A 9 5 0 1 4 AP N : 3 2 6 - 2 0 - 0 4 8 IS S U E D F O R P L A N C H E C K MIXED USE PLANNED DEVELOPMENT APN:ZONING:SCOPE OF WORK:326-20-048V-BTYPE OF CONSTRUCTION:MOCCUPANCY:NOSPRINKLERS:2,600 SFBUILDING AREA:JURISDICTION:CITY OF CUPERTINODEMOLITION OF AN EXISTING 1,610 SF RETAIL BUILDING AND CONSTRUCTION OF A NEW 2,600 SF RETAIL BUILDING INCLUDING TRASH ENCLOSURE AND RECONFIGURATION OF SITE LANDSCAPE AND PARKING.2013 CBC, CPC, CMC, CECCITY OF CUPERTINO MUNICIPAL CODE 2013 CALIFORNIA FIRE CODE (WITH LOCAL AMENDMENTS)2013 BUILDING ENERGY EFFICIENCY STANDARDS 2013 CALIFORNIA GREEN BUILDING STANDARDS FIRE SPRINKLERS EX T E R N A L L I G H T I N G 01 O F 0 1 E X T E R N A L L I G H T I N G L A Y O U T 1 / 1 6 " = 1 ' - 0 " 1 EX I S T I N G / D E M O S I T E P L A N Rev. #DescriptionDate Reissued to City of Cupertino12/21/2015 (E ) B U I L D I N G 4, 5 0 0 S F (N ) R E T A I L B U I L D I N G 2, 6 0 0 S F 13 06 05 07 03 01 US P O S T OF F I C E PASADENA AVE. 02 03 04 05 06 06 02 07 08 09 10 11 06 06 13 14 15 16 24 ' - 0 " 16 ' - 0 " 12 9 ' - 4 1 / 4 " 01 01 12 ' - 0 1 / 4 " 14' - 0" 8' - 6" 17' - 0" 4' - 1 " ST E V E N S C R E E K B L V D . PD 1 . 1 7 PD 1 . 1 9 40' - 0"16' - 0"51' - 0"6' - 6 1/2" 16 ' - 0 " 4' - 0 " (EASEMENT ACCESS TO ADJACENT PROPERTY) OU T E R T U R N I N G R A D I U S (5 0 ' - 0 " M I N . ) ( T R A S H / F I R E ) IN N E R T U R N I N G R A D I U S (3 5 ' - 0 " M I N . ) ( T R A S H ) TR A S H M A N A G E M E N T TR U C K A C C E S S CL E A R 12 ' - 0 " IN N E R T U R N I N G R A D I U S (3 0 ' - 0 " M I N . ) ( F I R E ) 2' - 10"2' - 10" 6' - 7 " 4' - 0" 8' - 6 " 17 18 01 19 18 SLOPE SLO PE SLO PE S L O P E DN DN 3' - 0" 20 20 21 22 10 6 06 23 (E) BUILDING FOOTPRINT LANDSCAPE (SEE LANDSCAPE DRAWINGS)TRUNCATED DOME BORDER PATH OF TRAVEL FIRETRUCK TURNING RADII EXISTING AREAS SITE AREA 25,600 SF (0.59Acres) 100.0%EXISTING RETAIL BUILDING 4,500 SF (TO REMAIN)EXISTING RESTAURANT BUILDING 1,610 SF (TO BE DEMOLISHED)GROSS TOTAL BUILDING AREA 6,110 SF NET TOTAL BUILDING AREA5,071 SF (85% GROSS )EXISTING PARKING STANDARD 33 SPACES PROVIDED PROPOSED AREAS SITE AREA 25,600 SF (0.59 Acres)100.0%EXISTING RETAIL BUILDING 4,500 SF 17.57%PROPOSED RETAIL BUILDING 2,600 SF 10.15%GROSS TOTAL BUILDING AREA 7,100 SF 27.72%NET TOTAL BLDG AREA (85% GROSS) 6,035 SF LANDSCAPE AREAS EXISTING LANDSCAPE AREA 1,380 SF LANDSCAPE AREA ADDED / MODIFIED 385 SF < 2500 SF PROPOSED LANDSCAPE AREA 1,687 SF6.59%PAVED AREAS EXISTING PAVED AREA 18,110 SF PROPOSED PAVED AREA16,813 SF65.69%(PARKING + DRIVEWAY+WALKWAY+TRASH ENCLOSURE)MARTIAL ARTS12056.21.6OPEN 4-6 M-F2 KUMON11805.92.0OPEN 3-6 M-F2 CLEANERS6752.72.7 BARBER SHOP5802.32.3 BEAUTY8603.53.5 PROPOSED BUILDING260010.410.4 TOTAL71003122.54SQUAREFOOTAGEPARKINGREQUIREDPARKINGREQUIREDADJUSTEDBASED ON HOURS 27 TOTAL PARKING SPACES REQUIRED PROPOSED PARKING STANDARD32 SPACES ACCESSIBLE VAN 01 SPACE ACCESSIBLE01 SPACE 34 TOTAL SPACES PROVIDED BICYCLE PARKING REQUIRED5% OF 34 = 1.75 SPACES PROPOSED4 SPACESPARKING CALCULATION BASED ON NON RESIDENTIAL PARKING SUMMARY AND CBC 1004.1.1 (FOR OCCUPANT CALCULATION)REQUIRED PARKING STAFF PARKING REQUIREDNETASCLIEOOETFFILACEXP. 5/17JNRIAHNORCSEDYC 26469ERFFAEE.TAETI TCEATONHALLARCHITECTURE Project Number:Date: © 2 0 1 5 E a t o n H a l l A r c h i t e c t u r e , I n c . 1501 The Alameda, Ste 105 San Jose, CA   95126 TEL408.265.5255 FAX408.265.6155 A CALIFORNIA CORPORATION Sheet Title:CLIENT:Drawn by:Checked by:PD1.0SITE PLAN &SITE ACCESSIBILITYSTEVENS CREEK RETAIL PAD 21731 STEVENS CREEK BLVD. CUPERTINO, CA 95014URI FREELAND 12/7/20153.635 SD JE 1 " = 1 0 ' - 0 " 1 PR O P O S E D S I T E P L A N 01(E) DRIVEWAY 02(E) PROPERTY LINE 03(E) LANDSCAPE 04(E) WALKWAY 05(E) LINE OF ROOF ABOVE 06(N) LANDSCAPE 07(N) TRASH AND RECYCLE ENCLOSURE 08(N) ELECTRICAL TRANSFORMER 09(N) WETRISER 10(N) BIKE RACKS 11(N) LINE OF ROOF ABOVE 12(N) SIDEWALK 13(N) ACCESSIBLE PARKING LOADING BAY 14(N) ACCESSIBLE PARKING 15(E) TREES 16(N) TRASH RECEPTICLE LOCATION (TRIO AS PER CITY OF CUPERTINO STANDARDS)17(N) ACCESSIBLE WALKWAY 18(N) TRUNCATED DOME BORDER 19(N) BENCH 20(N) SIDEWALK EXTENSION (SEE CIVIL DRAWINGS)21(N) STREET LIGHT 22(N) CONCRETE WHEEL STOP, TYP.23(E) WATER & IRRIGATION CONNECTIONLEGENDSITE NOTESSITE TABULATION 1.THIS APPLICATION IS FOR SHELL ONLY AND NOT FOR OCCUPANCY. A SEPERATE SUBMITTAL WILL BE MADE FOR THE T.I. PORTIONS OF THE PROJECT.KEYNOTESPARKING MATRIX Rev. #DescriptionDate Reissued to City of Cupertino12/21/2015 CONC. BLOCK WALL C3X4.1X5'-6" L -SECUR TO WALL W/ (3) 5/8" ~ WELDED STUDS CENTERED AND 2'-6" APART 1"X1" SQUARE TUBING - DIAG.1" MIN. CLEAR (1/2" MAX.)1" CORRUGATED STEEL DECKING,PAINTED - WELD TO FRAME CANE BOLT FRAME DR. 4 SIDES W/3" X 2" X 1" L WELDED 3 PR. OF HEAVY-DUTY BUTT HINGES WELDED TO JAMB AND GATE FRAME CO N C . F O O T I N G LA N D S C A P I N G TH R E A D E D P I P E C A P H. C . S Y M B O L RE F L E C T O R I Z E D S I G N - W H I T E O N BL U E B A C K G R O U N D ( 7 0 S Q . I N . M I N . ) VA N A C C E S S I B L E S I G N ( A T VA N A C C E S S I B L E S T A L L ) 2" ~ G A L V . S T L . P I P E - E M B E D 18 " M I N . I N T O C O N C . F O O T I N G TH R O U G H B O L T A N D N U T VA N A C C E S S I B L E VAN STALL 6'-8" AT 2' - 0" 1' - 0 " 17 " 22" MA C H I N E S C R E W S T & B A N D WA S H E R S ( T Y P 4 P L A C E S ) < O F P A R K I N G S T A L L AL I G N S Y M B O L W / F R O N T OF P A R K I N G S T A L L PA I N T E D W H I T E P R O F I L E OV E R B L U E BA C K G R O U N D 3' - 0" 1' - 6 " 1' - 6 " BASE DIAMETER0.90"TOP DIAMETER0.45"NOMINAL2.35"HEIGHT0.20"BASE DIAMETER0.90"A TYP. SECTION A-ATAPERED EDGES WHERE EXPOSEDTYP. PLANA TOP DIAMETER0.45" (2 ) # 6 G A L V . D O W E L S 2 4 " L O N G , 9" F R O M E A C H E N D O F B U M P E R ST A L L PR E C A S T C O N C . W H E E L S T O P 3' - 0 " L O N G W / ( 2 ) # 3 B A R S AS P H A L T I C C O N C . P A V I N G OV E R A G G R E G A T E B A S E WH E E L S T O P 2'-0". 3' - 0 " . 1' - 0 " . 3" 2" 3" 3"3" 18 ' - 0 " M I N . 9' - 0" @ ACCESSIBLE STALL8' - 0" MIN. 01 03 04 05 06 07 08 13 1415 SLOPESLOPE OR G A N I C S ( 2 8 S F ) RE C Y C L A B L E ( 2 1 S F ) GA R B A G E ( 2 1 S F ) SL O P E 2 % M I N . SL O P E 2 % M I N . SLOPE 2% MIN.SLOPE 2% MIN. WA L K W A Y A R O I N D BU I L D I N G HO R I Z O N T A L W O O D S I D I N G ON C M U W A L L T O M A T C H W I T H PR O P O S E D R E T A I L S H E L L PR O P E R T Y L I N E PD 1 . 1 2 PD 1 . 1 10 3' - 0 " 2' - 8 1/2" S U R F A C E F L A N G E BO L T E D T O SI D E W A L K ST A I N L E S S S T E E L PI P E - " H O R S E S H O E HS 2 " FI N F L O O R AS P H A L T S H I N G L E S R O O F I N G T O M A T C H W I T H RE T A I L S H E L L R O O F VE R T I C A L T U B E S U P P O R T ( S S D ) FI N I S H F L O O R HO R I Z O N T A L W O O D S I D I N G ON C M U W A L L T O M A T C H W I T H PR O P O S E D R E T A I L S H E L L HO R I Z O N T A L W O O D S I D I N G ON W A L L T O M A T C H W I T H R E T A I L SH E L L AS P H A L T S H I N G L E S R O O F I N G T O MA T C H W I T H R E T A I L S H E L L R O O F FI N I S H F L O O R CO R R U G A T E D M E T A L DE C K I N G , P R I M E D & P A I N T E D 3/ 4 " D I A . C A N E B O L T 3/ 4 " D I A . D R O P B O L T NE T ASCLIEO OETFFILACEXP. 5/17JNRIAHNORCSEDYC 26469ERFFAEE.TAETI TCEATONHALLARCHITECTURE Project Number:Date: © 2 0 1 5 E a t o n H a l l A r c h i t e c t u r e , I n c . 1501 The Alameda, Ste 105 San Jose, CA   95126 TEL408.265.5255 FAX408.265.6155 A CALIFORNIA CORPORATION Sheet Title:CLIENT:Drawn by:Checked by:PD1.1SITE DETAILSSTEVENS CREEK RETAIL PAD 21731 STEVENS CREEK BLVD. CUPERTINO, CA 95014URI FREELAND 12/7/20153.635 SD JE 3 / 4 " = 1 ' - 0 " 3 Si t e D e t a i l - A C C E S S I B L E S I G N A G E 1 " = 1 ' - 0 " 4 Si t e D e t a i l - A C C E S S I B L E S Y M B O L 12" = 1'-0"5Site Detail - TRUNCATED DOME 1 1 / 2 " = 1 ' - 0 " 6 Si t e D e t a i l - W H E E L S T O P KEY NOTES 1 / 4 " = 1 ' - 0 " 7 AC C E S S I B L E P A R K I N G - A 1 / 4 " = 1 ' - 0 " 9 TR A S H E N C L O S U R E - P L A N 01(N) RETAIL BUILDING 02(N) ACCESS DOOR 03TRUNCATED DOME 04ACCESSIBLE SIGNAGE 05(N) LOADING & UNLOADING ACCESS AISLE BORDER TO BE PAINTED BLUE 06(N) STRIPES AT 36" MAX ON CENTER PAINTED A COLOR CONTRASTING WITH THE PARKING SURFACE, PREFERRABLY BLUE OR WHITE 07(N) ACCESSIBLE SYMBOL 08(N) WITHIN THE LOADING & UNLOADING ACCESS AISLE PAINT THE WORDS "NO PARKING" IN 12" MIN. HIGH WHITE LETTERS 09(E) BUILDING FACADE 10(E) LANDSCAPE 11(E) CURBFACE 12(E) SIDEWALK 13(N) CURBFACE 14(N) SIDEWALK 15(N) WHEELSTOP 1 " = 1 ' - 0 " 1 PR O P O S E D B I C Y C L E R A C K 1 / 4 " = 1 ' - 0 " 2 TR A S H E N C L O S U R E _ E L E V A T I O N - A 1/4" = 1'-0"10 TR A S H E N C L O S U R E _ E L E V A T I O N - B 3/4" = 1'-0"11TYPICAL GATE DETAILRev. #DescriptionDate Reissued to City of Cupertino12/21/2015 AB 01 05 PD3.12 PD 3 . 1 4 PD 3 . 1 1 C D 02 03 04 2' - 6 " 19 ' - 9 " 19 ' - 9 " 2' - 6" 44 ' - 6 " 4' - 9"57' - 5"5' - 10" 68' - 0" (N ) R E T A I L BU I L D I N G 12' - 0"6' - 6"12' - 0"6' - 6"12' - 0"4' - 3" 11 ' - 1 1 1 / 4 " 7' - 7 " 5' - 0 " 15 ' - 0 " 4' - 1 1 3 / 4 " 57' - 5" 18' - 9"8' - 9" 4' - 1 0 " 15 ' - 0 " 4' - 1 0 " 15 ' - 0 " 4' - 1 0 1 / 4 " EXISTING WALL NEW DOORPROPOSED WALL 101a EXTERIOR WALLS ONE ROW OF 6" STUD* WITH R-19 BATT INSULATION WITH 1 1/2" FIBER CEMENT BOARD WALL PANELING SYSTEM OVER METAL LATH OVER 3/8" DRAINAGE LAYER OVER AIR BARRIER OVER 1/2" EXTERIOR PLY.SHEATHING AT EXTERIOR SIDE AND 5/8" TYPE 'X' GYP AT INTERIOR SIDE ONE ROW OF 6" STUD* WITH R-19 BATT INSULATION WITH 1 1/2" FIBER CEMENT BOARD WALL PANELING SYSTEM OVER METAL LATH OVER 3/8" DRAINAGE LAYER OVER AIR BARRIER OVER 1/2" EXTERIOR PLY.SHEATHING AT EXTERIOR SIDE AND 5/8" TYPE 'X' GYP AT INTERIOR SIDE ONE ROW OF 2" STUD* WITH R-19 BATT INSULATION WITH 4" MASONRY VENEER SYSTEM OVER 3/8"DRAINAGE LAYER OVER AIR BARRIER OVER 1/2"EXTERIOR PLY. SHEATHING AT EXTERIOR SIDE AND 5/8" TYPE 'X' GYP AT INTERIOR SIDEEE1E2E3 *FOR EXTERIOR WALL STUD SIZE AND SPACING SEE STRUC. DWGSNETASCLIEOOETFFILACEXP. 5/17JNRIAHNORCSEDYC 26469ERFFAEE.TAETI TCEATONHALLARCHITECTURE Project Number:Date: © 2 0 1 5 E a t o n H a l l A r c h i t e c t u r e , I n c . 1501 The Alameda, Ste 105 San Jose, CA   95126 TEL408.265.5255 FAX408.265.6155 A CALIFORNIA CORPORATION Sheet Title:CLIENT:Drawn by:Checked by:PD2.1PROPOSEDFIRST FLOOR PLANSTEVENS CREEK RETAIL PAD 21731 STEVENS CREEK BLVD. CUPERTINO, CA 95014URI FREELAND 12/7/20153.635 SD JE 1/4" = 1'-0"1 PR O P O S E D F L O O R P L A N GENERAL NOTESLEGEND WALL TYPE LEGEND1.ALL EXTERIOR WALLS ARE DIMENSIONED FROM FACE OF SHEATHING. ALL DIMENSIONS MARKED "CLEAR" OR "CLR" SHALL BE MAINTAINED & SHALL ALLOW FOR THICKNESSES OF ALL WALL FINISHES, UON & SHALL NOT VARY MORE THAN ± 1/8" WITHOUT WRITTEN INSTRUCTION FROM ARCHITECT.2.WALLS THAT APPEAR TO ALIGN DO ALIGN. WALLS THAT APPEAR CENTERED ON COLUMNS OR MULLIONS ARE CENTERED ON COLUMNS OR MULLIONS.3."ALIGN" MEANS TO ACCURATELY LOCATE THE FINISHED FACES IN THE SAME PLANE.4.DIMENSIONS MARKED ± MEAN A TOLERANCE NOT GREATER NOR SMALLER THAN 2 INCHES FROM INDICATED DIMENSION, U.N.O. VERIFY FIELD DIMENSIONS EXCEEDING TOLERANCE WITH THE ARCHITECT. SECURE ARCHITECT'S APPROVAL.5.NOTIFY ARCHITECT IN WRITING OF ANY DISCREPANCIES OR CONFLICTS IN THE LOCATION(S) OF NEW CONSTRUCTION. UPON COMPLETION OF PARTITION LAYOUT, NOTIFY ARCHITECT. ALLOW TIME IN THE SCHEDULE FOR VERIFICATION OF THE LAYOUT BY THE ARCHITECT PRIOR TO PARTITION INSTALLATION.6.ALL WORK SHALL BE ERECTED & INSTALLED PLUMB,LEVEL, SQUARE & TRUE.7.DIMENSIONS LOCATING DOORS ARE TO FINISHED OPENING. UON.8.ALL DOORS SHALL HAVE 24" CLEAR ON STRIKE/PULL SIDE OF DOOR ON EXTERIOR WALLS. VERIFY & ADVISE ARCHITECT OF EXCEPTIONS PRIOR TO CLOSING OUT PARTITIONS.9.ALL NEW FLOOR PENETRATIONS FOR PIPING SHALL BE FULLY PACKED & SEALED IN ACCORDANCE WITH THE APPLICABLE BUILDING & FIRE CODES.10.ALL GLASS SHALL BE CLEAR TEMPERED GLASS, UNLESS OTHERWISE NOTED. GLAZING TONG MARKS SHALL NOT BE VISIBLE. CLEAN AND POLISH ALL GLASS PRIOR TO PROJECT DELIVERY.11.ALL CONCEALED LUMBER & BLOCKING TO BE FIRE TREATED.KEYNOTES 01LINE OF ROOF ABOVE 02(N) ELECTRIC TRANSFORMER 04(N) COLUMN (SSD)05LINE OF UTILITY FLOOR ABOVE 06(N) ACCESS LADDER 08(N) FABRIC AWNING (NON STRUCTURAL)Rev. #DescriptionDate Reissued to City of Cupertino12/21/2015 AB 01 05 PD3.12 PD 3 . 1 4 PD 3 . 1 1 C D 02 03 04 9" / 1 2 " 9" / 1 2 " 9" / 1 2 " 9" / 1 2 " SLOPE 5" / 12"5" / 12" SLOPE SLOPE 01 02 03 RI D G E 04 05 06 07 08 3/8" = 12" MIN. 26 ' - 3 " 11 ' - 8 " 12 ' - 6 " 44 ' - 6 " 70' - 0" 4' - 9"57' - 5"5' - 10" SL O P I N G R O O F A R E A : 3 , 2 7 9 S F SE R V I C E F L O O R A R E A : 52 3 S F 14' - 1 3/4"5' - 11 1/4" 15 ' - 8 3 / 4 " 1' - 0"1' - 0" 1' - 6 " 4' - 0" 50 ' - 0 " 17' - 5"9' - 5" 30 ' - 0 " 3' - 5 3 / 4 " NE T ASCLIEO OETFFILACEXP. 5/17JNRIAHNORCSEDYC 26469ERFFAEE.TAETI TCEATONHALLARCHITECTURE Project Number:Date: © 2 0 1 5 E a t o n H a l l A r c h i t e c t u r e , I n c . 1501 The Alameda, Ste 105 San Jose, CA   95126 TEL408.265.5255 FAX408.265.6155 A CALIFORNIA CORPORATION Sheet Title:CLIENT:Drawn by:Checked by:PD2.2PROPOSEDROOF PLANSTEVENS CREEK RETAIL PAD 21731 STEVENS CREEK BLVD. CUPERTINO, CA 95014URI FREELAND 12/7/20153.635 SD JE 1/4" = 1'-0"1 PR O P O S E D F L O O R P L A N LEGEND KEYNOTES 011 HOUR RATED FLAT ROOF 021 HOUR RATED SLOPING ROOF (ASPHALT SHINGLES ROOFING)03DORMER WINDOW (SEE ELEVATION)04ROOFTOP HVAC UNIT (SEE MECHANICAL DRAWINGS)05ROOF DRAIN WITH OVERFLOW 06RAINWATER GUTTER 07METAL FACIA 08WOODEN ACCENT BRACKET Rev. #DescriptionDate Reissued to City of Cupertino12/21/2015 NE T ASCLIEO OETFFILACEXP. 5/17JNRIAHNORCSEDYC 26469ERFFAEE.TAETI TCEATONHALLARCHITECTURE Project Number:Date: © 2 0 1 5 E a t o n H a l l A r c h i t e c t u r e , I n c . 1501 The Alameda, Ste 105 San Jose, CA   95126 TEL408.265.5255 FAX408.265.6155 A CALIFORNIA CORPORATION Sheet Title:CLIENT:Drawn by:Checked by:PD3.0EXISTINGELEVATIONSSTEVENS CREEK RETAIL PAD 21731 STEVENS CREEK BLVD. CUPERTINO, CA 95014URI FREELAND 12/7/20153.635 SD JE 3 / 1 6 " = 1 ' - 0 " 1 EX I S T I N G E L E V A T I O N _ S O U T H 3 / 1 6 " = 1 ' - 0 " 2 EX I S T I N G E L E V A T I O N _ S O U T H - E A S T 3/16" = 1'-0"3EXISTING ELEVATION_SOUTH-WEST Rev. #DescriptionDate Reissued to City of Cupertino12/21/2015 T.O. SLAB 0' - 0"T.O. GLAZING 10' - 0" 01 T.O. RIDGE 26' - 0" 02 03 04 01 03 06 1004 09 02 13 05 07 15 T.O. SLAB 0' - 0" A B T.O. GLAZING 10' - 0"T.O. RIDGE 26' - 0" C D 02 04 08 05 070910 11 13 03 T.O. SLAB 0' - 0"T.O. GLAZING 10' - 0" 01 05 T.O. RIDGE 26' - 0" 02 03 04 04 09 02 1305 T. O . S L A B 0' - 0 " A B T. O . G L A Z I N G 10 ' - 0 " T. O . R I D G E 26 ' - 0 " C D 04 08 10 11 02 09 01 14 15 NE T ASCLIEO OETFFILACEXP. 5/17JNRIAHNORCSEDYC 26469ERFFAEE.TAETI TCEATONHALLARCHITECTURE Project Number:Date: © 2 0 1 5 E a t o n H a l l A r c h i t e c t u r e , I n c . 1501 The Alameda, Ste 105 San Jose, CA   95126 TEL408.265.5255 FAX408.265.6155 A CALIFORNIA CORPORATION Sheet Title:CLIENT:Drawn by:Checked by:PD3.1PROPOSEDELEVATIONSSTEVENS CREEK RETAIL PAD 21731 STEVENS CREEK BLVD. CUPERTINO, CA 95014URI FREELAND 12/7/20153.635 SD/SR JE 1/8" = 1'-0"1 SO U T H E L E V A T I O N - S T R E E T 1/8" = 1'-0"2 EA S T E L E V A T I O N - P A R K I N G / S I D E 1/8" = 1'-0"3 NO R T H E L E V A T I O N - R E A R 1 / 8 " = 1 ' - 0 " 4 WE S T E L E V A T I O N - S I D E 01ASPHALT SHINGLES ROOFING 02HORIZONTAL WOOD SIDING FINISH ON WALL 03TENENT SIGNAGE 04WOODEN ACCENT BRACKET 05FABRIC AWNING OVER METAL FRAME (NON STRUCTURAL)06PAINTED WOOD LOUVERS 07EXTERIOR WALL MOUNTED FIXTURES 08WOOD SHUTTER 09PAINTED GUTTER 10PAINTED FACIA 11DORMER WINDOW 13ALUMINIUM STOREFRONT WINDOW SYSTEM (TYP.)143'x 3' ACCESS PANELFOR ROOFTOP AREA 15STL. ACCESS LADDERKEY NOTES 1 / 2 " = 1 ' - 0 " 5 VI E W - S O U T H E A S T Rev. #DescriptionDate Reissued to City of Cupertino12/21/2015             ! "### $%&  ""  '&%(  "  ) ( ' *"       #  +" , "                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            -   #                 % $   . & /   0  /   1 $     . 2  $ ,    $           + $ & /        3    +$ & /   0 & 3     &  0$& 0&30 0 40&3 '           !   " !    !   #  $ % "    " ! &   '      (    !      $% "  )    *++ ),,)! -$ 5   &        % !  *   .     ! & % !    % *   .   ) %    # # ) ,    )  + )  /    $  #            0     0 $  1    $      *   - &* 2  2 3  & $ 1    $  / % & (  4  5      $   % 6 ( & ! 6 % !  7  & 8 '   & * 2  ' & %  7   - 7 9  * :  $  1 ;   $ ;   ; * ;  - ; & * 2 ; 2 3  & )    . ** ),#,$ +   #               7     $   '  <   =    >               <   ) ?  9 #  )   :  <   )   ) #   )   .  <   )   ) * #  )  + .   '  @          7        , 7   :  A         +  # ,   = B #  )   :            ? B #                <   =    >              '( )    #      .  <   ?  9 #  )   : !    B " >             * C          >   ? D      :       2       0  (   0      + )     E 6                    0  2      EF 7 ,E6'EF 7     E 6           '     E  F     )            2      B  $        &     0     0               =  A               =   = =  F  :           0      A      F =       @            =        >             ?               >  :       =  A        #  )  '       A   >                                >      =   )  #            =     ?    >     0       =     >    : =     ?        7        0   A    ?    )            3    . & /   '  2  ! 2  2  ! 6 2  '  6 2  7      "   ,     ,     ,      "     "      '    "  * ,     ,     ,  8    "     "  %  #    "   ,    8 ,     ,  8    "     " From:Beth Ebben on behalf of City of Cupertino Planning Dept. To:Gian Martire Subject:FW: Vivi"s Plan Date:Monday, January 25, 2016 7:58:08 AM From the Planning Department’s general mailbox: From: 1bonicelli@comcast.net [mailto:1bonicelli@comcast.net] Sent: Sunday, January 24, 2016 12:04 PM To: City of Cupertino Planning Dept. Subject: Vivi's Plan Nowhere on the site listed on the "intent" sign posted at Vivi's ("Submit comments at the City of Cupertino's website at www.cupertino.org/planning") is there a link for comments - at least nothing obvious. If the building size is increased by over 50% will that not reduce the available parking? There are already many businesses in Cupertino which I will not patronize because they lack adequate parking, and it appears most new businesses are continuing that trend. I also have concerns over traffic in that area - it is already chaotic and somewhat of a choke point, often backing up from Bubb/Peninsula to the creek; is this being addressed? Perhaps if access to Pasadena at Stevens Creek was set up like Alves at Stelling it would help. Of the businesses there, only one is an in-and-out kind of place, the others (tutoring, martial arts, barber, salon) require a longer stay. This means slower parking turnaround. How is this even allowed for consideration? Please note that "limited time" parking spaces are a bad thing - unless there will someday be an effort to enforce the time limit? They effectively remove a spot from the pool. Regards, Tim Dowd