Loading...
HomeMy WebLinkAboutAH Packet 08-13-15CITY OF CUPERTINO AGENDA Thursday, August 13, 2015 Conference Room C ADMINISTRATIVE HEARING 5:00 PM ROLL CALL APPROVAL OF MINUTES 1.Subject: Draft Minutes of July 9, 2015 Recommended Action: approve or modify Draft Minutes of July 9, 2015 Draft Minutes ORAL COMMUNICATIONS (Reserved for persons wishing to address the Committee or Hearing Officer on issues that are not already included on the regular Order of Business) WRITTEN COMMUNICATIONS PUBLIC MEETING ITEMS 2.Subject: site modifications to an office building being used as a church Recommended Action: approve the applications per the Draft Resolutions Description: Application No(s): ASA-2015-17, TR-2015-33 Applicant(s): Kevin Chiang (Home of Christ Church) Location: 10420 Bubb Rd Architectural and Site approval to allow facade improvements, roof modifications, parking lot and trash enclosure improvements to an existing office building for church assembly use Tree Removal permit to allow the removal of three trees that are part of a previously approved landscape plan at an existing office building for church assembly use Administrative Hearing Officer's decision final unless appealed Page 1 CITY OF CUPERTINO August 13, 2015Administrative Hearing AGENDA Staff Report Draft Resolution ASA-2015-17 Draft Resolution TR-2015-33 Arborist Report Plan Set OLD BUSINESS NEW BUSINESS ADJOURNMENT In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend the next meeting who is visually or hearing impaired or has any disability that needs special assistance should call the City Clerk's Office at 408-777-3223, 48 hours in advance of the meeting to arrange for assistance. Upon request, in advance, by a person with a disability, meeting agendas and writings distributed for the meeting that are public records will be made available in the appropriate alternative format. Also upon request, in advance, an assistive listening device can be made available for use during the meeting. Members of the public are entitled to address the members concerning any item that is described in the notice or agenda for this meeting, before or during consideration of that item. If you wish to address the members on any other item not on the agenda, you may do so during the public comment portion of the meeting. Please limit your comments to three (3) minutes or less. Page 2 CITY OF CUPERTINO Administrative Hearing July 9, 2015 Cupertino, CA 95014 (408) 777-3308 ACTIONMINUTES OF THE REGULAR MEETING OF THE ADMINISTRATIVE HEARING HELD ON June 25,2015 ROLL CALL Hearing Officerpresent:Aarti Shrivastava, Director of Community Development Staff present: Piu Ghosh, SeniorPlanner Applicant(s)present:Bernard Baker, Project Manager, Apple Inc. APPROVAL OF MINUTES: 1. June 25, 2015 The minutes of June 25,2015were approved as written POSTPONEMENTS/REMOVAL FROM CALENDAR: None ORAL COMMUNICATION: None WRITTEN COMMUNICATIONS: Three emails were received by Staff regarding the item on the agenda: One pertained to screening of the proposed roof deck; one spoke to the degradation of the neighborhood due to the Apple Campus expansion; one spoke about privacy concerns with the visitor center being so close to the residences PUBLIC MEETING: 2.Application No.(s): ASA-2015-15 Applicant:Bernard Baker(Apple, Inc.) Location:10700 N Tantau Ave Architectural and Site application to review a parking structure and visitor reception area as part of a previously approved office research and development campus Administrative Hearingdecision final unless appealed. Staff Member Ghoshexplained that the applicant is proposing to make changes to the building designs located in the northeastern corner (Tantau and Pruneridge) of the Apple 2 Administrative Hearing July 9, 2015 Campus 2 construction site. The previously approved structure was 2 stories and that has been redesigned tobe a single structure. A parking garage was also envisioned, but due to reduction of the square footage, from 22,500 to 12,500, the garage has been moved to below grade with 684 parking spaces and the office component has been eliminated. Instead the applicant is proposing to use the space for a café, reception area and small retail sales. There will be 116 surface parking spaces. With this design change, the number of parking spaces approved for Phase 1, have been exceeded by 12. Staff is recommending that these spaces be mitigated with the use of future cross access easements covenants with the property owner to the north. However, this is only a reduction of 4 spaces. The other 8 spaces can be eliminated with the continuation of modifications throughout the development process or at issuance of building permits. The previously application called for an observation area on the second story of the building, but as this modification reduces the building to a single story, the applicant will be creating a rooftop deck. The deck will have appropriate screening for the neighbors along the eastern side. The City of Cupertino has an agreement with the City of Santa Clara that limits building heights in this area to 16’. The height of the elevator lobbies shown on the plans will need to be reduced to accommodate this requirement. The scope of the project changes were evaluated by the environmental consultant. They deemed the changed to be insignificant and therefore, not changes are necessary to the Final EIR. The Hearing Officer asked for clarification of the traffic flow to the parking areas. Cars will enter off of Tantau to the parking garage and valet area and then will exit back onto Tantau. The Hearing Officer asked if the proposed changes were still consistent with what had originally been approved by the City Council. Staff member Ghosh said that the applicant is still in conformance with the approved program. The Hearing Officer opened the meeting for Public Comments: Tyrone Sweet(sp), Pruneridge Ave, voiced concerns about how Apple plans to manage tourists coming to the site. He spoke of privacy concerns from people on the roof deck. He doesn’t feel there is adequate screening. He also doesn’t like the location of auto exhaust vents. The concern here is that after an event is over, everyone will starting their cars and exhaust will be blown all over the neighborhood. Rob Wagner, Pruneridge Ave. Santa Clara, asked about privacy for the residences on the south side of Pruneridge. Nancy Wagner, Pruneridge Ave. Santa Clara, also voiced concerns about tourists and additional traffic coming into the area. She said she has already had a very large tour bus park in front of her house as she lives directly across from the construction site. Tom Blasick (sp), Hancock Dr, Santa Clara, stated that his major concern is the increased traffic on Pruneridge. He asked if a traffic study was available. The Hearing Officer closed the Public Comment period. The Hearing Officer clarified for the audience that the discussion for today was the scope of the item on the agenda. She needed to make sure that the proposed modifications being requested still met all the rules and stayed within the confines of the original approval made by the City Council. So she could not speak directly about some of the concerns raised. The Hearing Officer reiterated that with the proposed applications, the project scope has been reduced. The building footprint has been changed from 22,500 to 12,500. Offices and retail uses have been reduced or eliminated. On the original approval the maximum building 3 Administrative Hearing July 9, 2015 height allowed was 35’ and 16’. The current building proposal is 23’ with elevator shafts extending another 18’, 6”. The elevator shafts will be reduced to 16’ in accordance with the agreement made forbuildings in this area of the project site. The originally approved 2 story parking garage has been removedand replaced with underground and surface parking. The Hearing Officer asked for clarification about the exhaust vents. Staff member Ghosh stated that the environmental review did not indicate that the configuration of the system exceeded any pollution standards. The Hearing Officer stated that in regards to the traffic concerns, the reduction in building size usually translates to a reduction in traffic. She directed further traffic concerns be addressed to the project planner for additional assistance. She stated that the City was here to help the residents and would partner with them to resolve issues and concerns about the construction noise,dust, traffic, etc. with Apple. In respect to the concerns mentioned about tourists, the representative from Apple said that the visitor’s center will only be open during from 7am to 7pm. There are no plans to change those hours. Special events will be monitored and managed. There was a brief discussion about the design of the roof deck to clarify in which direction someone using the space would be able to see. She asked the representative from Apple to continue to work with the neighbors. DECISION: The applicationwasapprovedby the Hearing Officerper the draft resolution with the following additions/modifications: Screening at the back of the roof top deck would be reviewed and approved by Staff; photometric study would be reviewed to make sure thatthere is no offsite glare/light onto the neighbors; approve the parking stall count to a maximum of 788, for a total of 9240 for Phase 1. The changes will be reviewed and approved before issuance of the building permits. ADJOURNMENT Respectfully submitted: /s/Beth Ebben Beth Ebben Administrative Clerk g:planning/AHCommittee/Minutes070915 ADMINISTRATIVE HEARINGSTAFF REPORT Agenda Item No. Agenda Date:August 13, 2015 Applications: ASA-2015-17, TR-2015-33 Applicant/owner:Kevin Chiang(Home of Christ Church) Project Location:10420 Bubb Road APN-357-20-038 Application Summary: 1.Architectural and Site Approval Permit (ASA-2015-17)to allow façade improvements, parking lot and trash enclosure improvements to an existing office building for church assembly use. 2.Tree Removal Permit (TR-2015-33) to allow the removal of three trees that are part of a previously approved landscape plan at an existing office building for church assembly use. RECOMMENDATION: Staff recommends that the Hearing Officerapprove the Architectural and Site Approval Permit(ASA- 2015-17)and Tree Removal Permit (TR-2015-33)per the draftresolutions. PROJECT DATA: General Plan Designation Light Industrial/Residential/Commercial Zoning Designation Light Industrial,(ML-rc) Environmental Assessment Categorically Exempt Project Consistency With: General Plan Yes Zoning Yes BACKGROUND: Existing Siteand Surroundings The project site is located in the Bubb Road Industrial Park, which is located along Bubb Road between Stevens Creek Boulevard and McClellanRoad.Theprojectsite is surrounded by a church to the north and light industrial uses to the westandsouth, with the project site bordered by Highway 85 to theeast. The project site is an existingtwo-story office buildingowned by the Home of Christ Church, with the northern half of the buildingleased andoccupied Apple, and the southern halfoccupiedby ancillary Home of ChristChurchoffice uses. Apple received the Community Development Director’sapproval for building interior/exteriorand landscape improvements in 2014 and those improvements are OFFICE OF COMMUNITY DEVELOPMENT PLANNING DIVISION CITY HALL 10300 TORRE AVENUE •CUPERTINO, CA 95014-3255 (408) 777-3308 • FAX (408) 777-3333 2. ASA-2015-17, TR-2015-33 Home of Christ Church August13, 2015 Page 2 completed.Those previously approved areas are identified on the plan set and are not part of this application. Only the southern half of the building and its surroundingexterior yard areas are part of this application. DISCUSSION: Application requests In 2014, the applicant received Architectural & Site (ASA-2013-01) and Tree Removal Permit(TR-2013- 02) approvals from the City to allow building façade, roof,andsite improvements to facilitate a conversion of the office/warehouse space to church assembly use. The applicant is resubmitting foran Architectural & Site Approvalfor approval fora more conservative designwhile being consistent with the prior site improvements.The current Tree Removal Permit is consistent with the prior approval. The proposed scope includes three tree removals near the front entrance feature with five tree replacements proposed in the side parking lot. Architectural & Site Approval The architecturaland site improvements affect only the southern portion of the buildingand lotthat will be occupied by the church. Those modifications include: New portico features for the front and rear entry that identify the entry ways. The revised design is more respectful of thecurrent design without overly emphasizing the change of building use; Adequate striped parking that meets the City’s parking requirements for church use. The church is proposing a sanctuary space that accommodates 750 seats. The parking requirement is 188 parking spaces (750 seats/4 parking spaces/seat = 188 parking stalls) and the applicant is providingexcess parking with195 onsite parking stalls. The parking supply includes the spaces used by Apple; however, the building users have different peak periods that do not conflict, so the parking can be shared. The church also shares parking with the adjacent (and connected) property to the north, 10340Bubb Road, which is also owned by the church; A new roofed trash enclosure, to service Apple and the Home of Christ Church; A fenced outdoor area that includes a sports court, and an area for a future playground structure. Staff supports the proposed façade modifications and site improvements as they are compatible with the architecture of the surroundingbuildingsand facilitate the use of the building for church use. Tree Removals The applicant also proposes to remove three(3)ornamental treesthat are part of an approved landscape planand are affected by the enlarged front entry of the church. The arborist report identifies them as two American Sweet Gumswith 19 and 12 inch diameters(tree nos. 2201 & 2234) and a White Birchwith a 13 inch diameter(tree no. 2235). The applicant is proposing to replacethe removed trees with five 15-gallon silk trees (Albizia julibrissin). To comply with the City’s Protected Tree Ordinance, staff is recommending the replacement trees be up-sized to 24-inch box specimens. The replacement trees would be located in the southern parking lot, which presently does not have landscaping features.The trees grow to moderate height with broad crowns. ASA-2015-17, TR-2015-33 Home of Christ Church August13, 2015 Page 3 Outreach/Noticing The following table is a brief summary of the noticing done for this project: Notice of Public Hearing, Legal Ad Agenda Legal ad placed in newspaper (at least 10 days prior to the hearing) Notices mailed to property owners adjacent to the project site (10 days prior to the hearing) Posted on the City's official notice bulletin board (one week prior to the hearing) Posted on the City of Cupertino’sWeb site (one week prior to the hearing) No public comments were received at the time of staff report production. PERMIT STREAMLINING ACT This project is subject to the Permit Streamlining Act (Government Code Section 65920 –65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received: July 16,2015 Deemed Complete:July 30, 2015 The City has 60 days (until September 30, 2015) to make a decision on the project since this project is Categorically ExemptfromCEQA.The Hearing Officer’s decision on this project is final unless appealed to the Planning Commissionwithin 14 calendar days of the decision. CONCLUSION Staff recommends approval of the Architectural and Site Applicationand Tree RemovalPermit,since the plansand conditions of approvalsaddress all concerns related to the proposed project.Additionally, all of the findings for approval of the proposed project, are consistent with Chapter 19.168and 14.18of the Cupertino Municipal Code. Submittedby:Gian Paolo Martire, AssistantPlanner Attachments DraftResolutionASA-2015-17 Draft Resolution TR-2015-33 Arborist Report prepared by Michael L. Bench dated May 6, 2014 Plan Set CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRAFT RESOLUTION OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO TO ALLOW AN ARCHITECTURAL AND SITE APPROVAL FOR MINOR BUILDING FAÇADE MODIFICATIONS AND SITE IMPROVEMENTS AT THE HOME OF CHRIST CHURCH LOCATED AT 10420 BUBB ROAD SECTION I: PROJECT DESCRIPTION Application No.: ASA-2015-17 Applicant: Kevin Chiang (Home of Christ Church) Location: 10420 Bubb Road (APN 357-20-038) SECTION II: FINDINGS WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an application for an Architectural and Site Approval permit as described in Section I. of this Resolution; and WHEREAS, the project is categorically exempt from the California Environmental Quality Act (CEQA); WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer held a public meeting on August 13, 2015 in regard to the application; and WHEREAS, the Administrative Hearing Officer finds: 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The façade modifications of a building located in an established industrial office park in an industrial zone will be installed and constructed pursuant to the requirements of the California Building Code with the proper building permits. The building modifications affect only the subject building and will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience. 2. The proposal is consistent with the purposes of Chapter 19.168, Architectural and Site Review, of the Cupertino Municipal Code, the General Plan, any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale have been avoided. A gradual transition related to height and bulk has been achieved between new and existing buildings. Draft Resolution ASA-2015-17 August 13, 2015 Page 2 The façade modifications are compatible with the scale of the building and the architecture of the surrounding industrial/office buildings. Therefore, there will be no abrupt changes in building scale and no new buildings are being proposed. b) Design harmony between new and existing buildings has been preserved and the materials, textures and colors of new buildings harmonize with adjacent development with design and color schemes, and with the future character of the neighborhood and purposes of the zone in which it is situated. The location, height and materials of walls, fencing, hedges and screen planting harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots have been concealed. Ground cover or various types of pavements have been used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees has been avoided. Lighting for development is adequate to meet safety requirements as specified by the engineering and building departments and shielding to adjoining property owners. The façade modifications are harmonious with the existing buildings in the industrial park and will not impact adjoining properties. Proposed trash areas will be enclosed and roofed. Additional landscaping is being proposed to soften the existing parking lot to the south. New lighting sources are shielded but there are no adjacent residential developments that will be impacted. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures shall minimize traffic hazards and shall positively affect the general appearance of the neighborhood and harmonize with adjacent development. No additional signage is being proposed with these building and site improvements. d) This new development, within an existing residential neighborhood, has been designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. There is no existing residential neighborhood that would be affected by this development. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 3 thereof, the application for an Architectural and Site Approval, Application no. ASA-2015-17, is hereby approved, and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the Public Meeting record concerning Application no.(s) ASA-2015-17 as set forth in the Minutes of Administrative Hearing Meeting of August 13, 2015, and are incorporated by reference as though fully set forth herein. Draft Resolution ASA-2015-17 August 13, 2015 Page 3 SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set entitled “TI and Site Improvement, The Home of Christ Church in Cupertino, 10420 Bubb Rd, Cupertino Ca.”, consisting of six (6) sheets labeled A1 through A7 drawn by Kevin Chiang, AIA, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 4. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. TR-2015-33 shall be applicable to this approval. 5. BICYCLE PARKING The applicant shall provide bicycle parking and bike racks for the proposed project in accordance with the City’s Parking Regulations under Chapter 19.124 of the Cupertino Municipal Code. 6. DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to issuance of final demolition permits. 7. TREE REPLACEMENT The applicant shall provide adequate tree replacements for trees proposed to be removed in conjunction with the proposed project. The number, location and type of trees shall be incorporated into the detailed landscape plan to be reviewed and approved by the Director of Community Development. 8. FINAL ARCHITECTURAL DETAILS The final building design and exterior treatment plans shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The Director of Community Development may approve additional designs or make minor variations as deemed appropriate. The final building exterior plan shall closely resemble the details shown on the originally approved plans. Any exterior changes determined to be substantial by the Director of Community Development shall require a modification approval. 9. FINAL LANDSCAPE DETAILS Draft Resolution ASA-2015-17 August 13, 2015 Page 4 The applicant shall submit detailed landscape and irrigation plans to be reviewed and approved by Community Development Director prior to issuance of building permits. The landscape plan shall include water conservation and pesticide reduction measures in conformance with Chapter 14.15, Xeriscape Landscaping, and the pesticide control measures referenced in Chapter 9.18, Stormwater Pollution Prevention and Watershed Protection, of the Cupertino Municipal Code. 10. TRANSFORMERS New electrical transformers, telephone cabinets and similar equipment shall be placed in underground vaults. The developer must receive written approval from both the Public Works Department and the Community Development Department prior to installation of any above ground equipment. Should above ground equipment be permitted by the City, equipment and enclosures shall be screened with fencing and landscaping such that said equipment is not visible from public street areas, as determined by the Community Development Department. Transformers shall not be located in the front setback area. 11. UTILITY STRUCTURE PLAN Prior to issuance of building permits, the applicant shall work with staff to provide a detailed utility plan to demonstrate screening or undergrounding of all new utility structures [including, but not limited to backflow preventers (BFP), fire department connections (FDC), post-indicator valves (PIV), and gas meters] to the satisfaction of the Director of Community Development, Public Works, Fire Department, and applicable utility agencies. 12. MECHANICAL SCREENING All mechanical and other equipment on the building or on the site shall be screened so they are not visible from public street areas or adjoining developments. Screening materials/colors shall match building features and materials. The height of the screening shall be taller than the height of the mechanical equipment that it is designed to screen. The screening area shall be proportional to the amount of rooftop equipment needing visual screening. Large gaps and awkward screen angles shall be avoided. The location of equipment and necessary screening shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. 13. LANDSCAPE INSTALLATION REPORT The project is subject to all provisions delineated in the Landscape Ordinance (CMC, Chapter 14.15). A landscape installation audit shall be conducted by a certified landscape professional after the landscaping and irrigation system have been installed. The findings of the assessment shall be consolidated into a landscape installation report. The landscape installation report shall include, but is not limited to: inspection to confirm that the landscaping and irrigation system are installed as specified in the landscape and irrigation design plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that causes overland flow, and preparation of an irrigation schedule. The landscape installation report shall include the following statement: “The landscape and irrigation system have been installed as specified in the landscape and irrigation design plan and complies with the criteria of the ordinance and the permit.” Draft Resolution ASA-2015-17 August 13, 2015 Page 5 14. LANDSCAPE AND IRRIGATION MAINTENANCE Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be established and submitted to the Director of Community Development or his/her designee, either with the landscape application package, with the landscape installation report, or any time before the landscape installation report is submitted. a. Schedules should take into account water requirements for the plant establishment period and water requirements for established landscapes. b. Maintenance shall include, but not be limited to the following: routine inspection; pressure testing, adjustment and repair of the irrigation system; aerating and de-thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of failed plants; weeding; pest control; and removing obstructions to emission devices. c. Failed plants shall be replaced with the same or functionally equivalent plants that may be size- adjusted as appropriate for the stage of growth of the overall installation. Failing plants shall either be replaced or be revived through appropriate adjustments in water, nutrients, pest control or other factors as recommended by a landscaping professional. 15. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 16. INDEMNIFICATION To the extent permitted by law, the Applicant shall indemnify and hold harmless the City, its City Council, its officers, employees and agents (the “indemnified parties”) from and against any claim, action, or proceeding brought by a third party against the indemnified parties and the applicant to attack, set aside, or void this or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys’ fees and costs incurred in defense of the litigation. The City may, in its sole discretion, elect to defend any such action with attorneys of its choice. 17. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. Draft Resolution ASA-2015-17 August 13, 2015 Page 6 PASSED AND ADOPTED this 13th day of August, 2015 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: Gian Martire Gary Chao Assistant Planner Asst. Director of Community Development CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRAFT RESOLUTION OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO TO ALLOW THE REMOVAL AND REPLACEMENT OF THREE TREES: 2 AMERICAN SWEET GUMS AND 1 WHITE BIRCH THAT ARE PART OF AN APPROVED LANDSCAPE PLAN FOR THE HOME OF CHRIST CHURCH AT 10420 BUBB ROAD SECTION I: PROJECT DESCRIPTION Application No.: TR-2015-33 Applicant: Kevin Chiang (Home of Christ Church) Location: 10420 Bubb Road (APN 357-20-038) SECTION II: FINDINGS WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an application for a Tree Removal Permit as described in Section I. of this Resolution; and WHEREAS, the project is categorically exempt from the California Environmental Quality Act (CEQA); WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officer held a public meeting on August 13, 2015 in regard to the application; and WHEREAS, the Administrative Hearing Officer finds: 1. That the location of the trees restricts the economic enjoyment of the property by severely limiting the use of property in a manner not typically experienced by owners of similarly zoned and situated property, and the applicant has demonstrated to the satisfaction of the approval authority that there are no reasonable alternatives to preserve the tree(s). NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 2 thereof, the application for Tree Removal, Application no. TR-2015-33, is hereby approved, and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the Public Meeting record concerning Application no.(s) TR-2015-33 as set forth in the Minutes of Administrative Hearing Meeting of August 13, 2015, and are incorporated by reference as though fully set forth herein. Draft Resolution TR-2015-33 August 13, 2015 Page 2 SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set entitled “TI and Site Improvement, The Home of Christ Church in Cupertino, 10420 Bubb Rd, Cupertino Ca.”, consisting of six (6) sheets labeled A1 through A7 drawn by Kevin Chiang, AIA, and an arborist report prepared by Michael L. Bench dated May 6, 2014, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 4. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no. ASA-2015-17 shall be applicable to this approval. 5. TREE REPLACEMENT The applicant shall provide adequate tree replacements for trees proposed to be removed in conjunction with the proposed project. The number, location and type of trees are incorporated into the approved landscape plan, which is amended to increase the planting tree size to 24-inch box specimens for all five replacement trees. 6. FINAL LANDSCAPE DETAILS The applicant shall submit detailed landscape and irrigation plans to be reviewed and approved by Community Development Director prior to issuance of building permits. The landscape plan shall include water conservation and pesticide reduction measures in conformance with Chapter 14.15, Xeriscape Landscaping, and the pesticide control measures referenced in Chapter 9.18, Stormwater Pollution Prevention and Watershed Protection, of the Cupertino Municipal Code. 7. LANDSCAPE INSTALLATION REPORT The project is subject to all provisions delineated in the Landscape Ordinance (CMC, Chapter 14.15). A landscape installation audit shall be conducted by a certified landscape professional after the landscaping and irrigation system have been installed. The findings of the assessment shall be consolidated into a landscape installation report. The landscape installation report shall include, but is not limited to: inspection to confirm that the landscaping and irrigation system are installed as specified in the landscape and irrigation design plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that causes overland flow, and preparation of an irrigation schedule. Draft Resolution TR-2015-33 August 13, 2015 Page 3 The landscape installation report shall include the following statement: “The landscape and irrigation system have been installed as specified in the landscape and irrigation design plan and complies with the criteria of the ordinance and the permit.” 8. LANDSCAPE AND IRRIGATION MAINTENANCE Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be established and submitted to the Director of Community Development or his/her designee, either with the landscape application package, with the landscape installation report, or any time before the landscape installation report is submitted. a. Schedules should take into account water requirements for the plant establishment period and water requirements for established landscapes. b. Maintenance shall include, but not be limited to the following: routine inspection; pressure testing, adjustment and repair of the irrigation system; aerating and de-thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of failed plants; weeding; pest control; and removing obstructions to emission devices. c. Failed plants shall be replaced with the same or functionally equivalent plants that may be size- adjusted as appropriate for the stage of growth of the overall installation. Failing plants shall either be replaced or be revived through appropriate adjustments in water, nutrients, pest control or other factors as recommended by a landscaping professional. 9. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 10. INDEMNIFICATION To the extent permitted by law, the Applicant shall indemnify and hold harmless the City, its City Council, its officers, employees and agents (the “indemnified parties”) from and against any claim, action, or proceeding brought by a third party against the indemnified parties and the applicant to attack, set aside, or void this or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys’ fees and costs incurred in defense of the litigation. The City may, in its sole discretion, elect to defend any such action with attorneys of its choice. 11. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. Draft Resolution TR-2015-33 August 13, 2015 Page 4 PASSED AND ADOPTED this 13th day of August, 2015 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: Gian Martire Gary Chao Assistant Planner Asst. Director of Community Development