HomeMy WebLinkAboutAH Packet 08-13-15CITY OF CUPERTINO
AGENDA
Thursday, August 13, 2015
Conference Room C
ADMINISTRATIVE HEARING
5:00 PM
ROLL CALL
APPROVAL OF MINUTES
1.Subject: Draft Minutes of July 9, 2015
Recommended Action: approve or modify Draft Minutes of July 9, 2015
Draft Minutes
ORAL COMMUNICATIONS
(Reserved for persons wishing to address the Committee or Hearing Officer on
issues that are not already included on the regular Order of Business)
WRITTEN COMMUNICATIONS
PUBLIC MEETING ITEMS
2.Subject: site modifications to an office building being used as a church
Recommended Action: approve the applications per the Draft Resolutions
Description:
Application No(s): ASA-2015-17, TR-2015-33
Applicant(s): Kevin Chiang (Home of Christ Church)
Location: 10420 Bubb Rd
Architectural and Site approval to allow facade improvements, roof modifications,
parking lot and trash enclosure improvements to an existing office building for
church assembly use
Tree Removal permit to allow the removal of three trees that are part of a previously
approved landscape plan at an existing office building for church assembly use
Administrative Hearing Officer's decision final unless appealed
Page 1 CITY OF CUPERTINO
August 13, 2015Administrative Hearing AGENDA
Staff Report
Draft Resolution ASA-2015-17
Draft Resolution TR-2015-33
Arborist Report
Plan Set
OLD BUSINESS
NEW BUSINESS
ADJOURNMENT
In compliance with the Americans with Disabilities Act (ADA), anyone who is planning
to attend the next meeting who is visually or hearing impaired or has any disability that
needs special assistance should call the City Clerk's Office at 408-777-3223, 48 hours
in advance of the meeting to arrange for assistance. Upon request, in advance, by a
person with a disability, meeting agendas and writings distributed for the meeting that
are public records will be made available in the appropriate alternative format. Also
upon request, in advance, an assistive listening device can be made available for use
during the meeting.
Members of the public are entitled to address the members concerning any item that is
described in the notice or agenda for this meeting, before or during consideration of
that item. If you wish to address the members on any other item not on the agenda, you
may do so during the public comment portion of the meeting. Please limit your
comments to three (3) minutes or less.
Page 2 CITY OF CUPERTINO
Administrative Hearing
July 9, 2015
Cupertino, CA 95014
(408) 777-3308
ACTIONMINUTES OF THE REGULAR MEETING OF
THE ADMINISTRATIVE HEARING HELD ON June 25,2015
ROLL CALL
Hearing Officerpresent:Aarti Shrivastava, Director of Community Development
Staff present: Piu Ghosh, SeniorPlanner
Applicant(s)present:Bernard Baker, Project Manager, Apple Inc.
APPROVAL OF MINUTES:
1. June 25, 2015
The minutes of June 25,2015were approved as written
POSTPONEMENTS/REMOVAL FROM CALENDAR:
None
ORAL COMMUNICATION:
None
WRITTEN COMMUNICATIONS:
Three emails were received by Staff regarding the item on the agenda: One pertained to
screening of the proposed roof deck; one spoke to the degradation of the neighborhood due
to the Apple Campus expansion; one spoke about privacy concerns with the visitor center
being so close to the residences
PUBLIC MEETING:
2.Application No.(s): ASA-2015-15
Applicant:Bernard Baker(Apple, Inc.)
Location:10700 N Tantau Ave
Architectural and Site application to review a parking structure and visitor reception
area as part of a previously approved office research and development campus
Administrative Hearingdecision final unless appealed.
Staff Member Ghoshexplained that the applicant is proposing to make changes to the
building designs located in the northeastern corner (Tantau and Pruneridge) of the Apple
2 Administrative Hearing
July 9, 2015
Campus 2 construction site. The previously approved structure was 2 stories and that has
been redesigned tobe a single structure. A parking garage was also envisioned, but due to
reduction of the square footage, from 22,500 to 12,500, the garage has been moved to below
grade with 684 parking spaces and the office component has been eliminated. Instead the
applicant is proposing to use the space for a café, reception area and small retail sales. There
will be 116 surface parking spaces. With this design change, the number of parking spaces
approved for Phase 1, have been exceeded by 12. Staff is recommending that these spaces be
mitigated with the use of future cross access easements covenants with the property owner to
the north. However, this is only a reduction of 4 spaces. The other 8 spaces can be eliminated
with the continuation of modifications throughout the development process or at issuance of
building permits. The previously application called for an observation area on the second
story of the building, but as this modification reduces the building to a single story, the
applicant will be creating a rooftop deck. The deck will have appropriate screening for the
neighbors along the eastern side. The City of Cupertino has an agreement with the City of
Santa Clara that limits building heights in this area to 16’. The height of the elevator lobbies
shown on the plans will need to be reduced to accommodate this requirement. The scope of
the project changes were evaluated by the environmental consultant. They deemed the
changed to be insignificant and therefore, not changes are necessary to the Final EIR.
The Hearing Officer asked for clarification of the traffic flow to the parking areas. Cars will
enter off of Tantau to the parking garage and valet area and then will exit back onto Tantau.
The Hearing Officer asked if the proposed changes were still consistent with what had
originally been approved by the City Council. Staff member Ghosh said that the applicant is
still in conformance with the approved program.
The Hearing Officer opened the meeting for Public Comments:
Tyrone Sweet(sp), Pruneridge Ave, voiced concerns about how Apple plans to manage
tourists coming to the site. He spoke of privacy concerns from people on the roof deck. He
doesn’t feel there is adequate screening. He also doesn’t like the location of auto exhaust
vents. The concern here is that after an event is over, everyone will starting their cars and
exhaust will be blown all over the neighborhood.
Rob Wagner, Pruneridge Ave. Santa Clara, asked about privacy for the residences on the
south side of Pruneridge.
Nancy Wagner, Pruneridge Ave. Santa Clara, also voiced concerns about tourists and
additional traffic coming into the area. She said she has already had a very large tour bus
park in front of her house as she lives directly across from the construction site.
Tom Blasick (sp), Hancock Dr, Santa Clara, stated that his major concern is the increased
traffic on Pruneridge. He asked if a traffic study was available.
The Hearing Officer closed the Public Comment period.
The Hearing Officer clarified for the audience that the discussion for today was the scope of
the item on the agenda. She needed to make sure that the proposed modifications being
requested still met all the rules and stayed within the confines of the original approval made
by the City Council. So she could not speak directly about some of the concerns raised.
The Hearing Officer reiterated that with the proposed applications, the project scope has
been reduced. The building footprint has been changed from 22,500 to 12,500. Offices and
retail uses have been reduced or eliminated. On the original approval the maximum building
3 Administrative Hearing
July 9, 2015
height allowed was 35’ and 16’. The current building proposal is 23’ with elevator shafts
extending another 18’, 6”. The elevator shafts will be reduced to 16’ in accordance with the
agreement made forbuildings in this area of the project site. The originally approved 2 story
parking garage has been removedand replaced with underground and surface parking.
The Hearing Officer asked for clarification about the exhaust vents. Staff member Ghosh
stated that the environmental review did not indicate that the configuration of the system
exceeded any pollution standards. The Hearing Officer stated that in regards to the traffic
concerns, the reduction in building size usually translates to a reduction in traffic. She
directed further traffic concerns be addressed to the project planner for additional assistance.
She stated that the City was here to help the residents and would partner with them to
resolve issues and concerns about the construction noise,dust, traffic, etc. with Apple.
In respect to the concerns mentioned about tourists, the representative from Apple said that
the visitor’s center will only be open during from 7am to 7pm. There are no plans to change
those hours. Special events will be monitored and managed.
There was a brief discussion about the design of the roof deck to clarify in which direction
someone using the space would be able to see.
She asked the representative from Apple to continue to work with the neighbors.
DECISION: The applicationwasapprovedby the Hearing Officerper the draft resolution
with the following additions/modifications:
Screening at the back of the roof top deck would be reviewed and approved by Staff;
photometric study would be reviewed to make sure thatthere is no offsite glare/light onto
the neighbors; approve the parking stall count to a maximum of 788, for a total of 9240 for
Phase 1. The changes will be reviewed and approved before issuance of the building permits.
ADJOURNMENT
Respectfully submitted:
/s/Beth Ebben
Beth Ebben
Administrative Clerk
g:planning/AHCommittee/Minutes070915
ADMINISTRATIVE HEARINGSTAFF REPORT
Agenda Item No. Agenda Date:August 13, 2015
Applications: ASA-2015-17, TR-2015-33
Applicant/owner:Kevin Chiang(Home of Christ Church)
Project Location:10420 Bubb Road APN-357-20-038
Application Summary:
1.Architectural and Site Approval Permit (ASA-2015-17)to allow façade improvements, parking lot
and trash enclosure improvements to an existing office building for church assembly use.
2.Tree Removal Permit (TR-2015-33) to allow the removal of three trees that are part of a previously
approved landscape plan at an existing office building for church assembly use.
RECOMMENDATION:
Staff recommends that the Hearing Officerapprove the Architectural and Site Approval Permit(ASA-
2015-17)and Tree Removal Permit (TR-2015-33)per the draftresolutions.
PROJECT DATA:
General Plan Designation Light Industrial/Residential/Commercial
Zoning Designation Light Industrial,(ML-rc)
Environmental Assessment Categorically Exempt
Project Consistency With:
General Plan Yes
Zoning Yes
BACKGROUND:
Existing Siteand Surroundings
The project site is located in the Bubb Road Industrial Park, which is located along Bubb Road between
Stevens Creek Boulevard and McClellanRoad.Theprojectsite is surrounded by a church to the north
and light industrial uses to the westandsouth, with the project site bordered by Highway 85 to theeast.
The project site is an existingtwo-story office buildingowned by the Home of Christ Church, with the
northern half of the buildingleased andoccupied Apple, and the southern halfoccupiedby ancillary
Home of ChristChurchoffice uses. Apple received the Community Development Director’sapproval
for building interior/exteriorand landscape improvements in 2014 and those improvements are
OFFICE OF COMMUNITY DEVELOPMENT
PLANNING DIVISION
CITY HALL
10300 TORRE AVENUE •CUPERTINO, CA 95014-3255
(408) 777-3308 • FAX (408) 777-3333
2.
ASA-2015-17, TR-2015-33 Home of Christ Church August13, 2015
Page 2
completed.Those previously approved areas are identified on the plan set and are not part of this
application. Only the southern half of the building and its surroundingexterior yard areas are part of
this application.
DISCUSSION:
Application requests
In 2014, the applicant received Architectural & Site (ASA-2013-01) and Tree Removal Permit(TR-2013-
02) approvals from the City to allow building façade, roof,andsite improvements to facilitate a
conversion of the office/warehouse space to church assembly use. The applicant is resubmitting foran
Architectural & Site Approvalfor approval fora more conservative designwhile being consistent with
the prior site improvements.The current Tree Removal Permit is consistent with the prior approval. The
proposed scope includes three tree removals near the front entrance feature with five tree replacements
proposed in the side parking lot.
Architectural & Site Approval
The architecturaland site improvements affect only the southern portion of the buildingand lotthat will
be occupied by the church. Those modifications include:
New portico features for the front and rear entry that identify the entry ways. The revised design
is more respectful of thecurrent design without overly emphasizing the change of building use;
Adequate striped parking that meets the City’s parking requirements for church use. The church
is proposing a sanctuary space that accommodates 750 seats. The parking requirement is 188
parking spaces (750 seats/4 parking spaces/seat = 188 parking stalls) and the applicant is
providingexcess parking with195 onsite parking stalls. The parking supply includes the spaces
used by Apple; however, the building users have different peak periods that do not conflict, so
the parking can be shared. The church also shares parking with the adjacent (and connected)
property to the north, 10340Bubb Road, which is also owned by the church;
A new roofed trash enclosure, to service Apple and the Home of Christ Church;
A fenced outdoor area that includes a sports court, and an area for a future playground structure.
Staff supports the proposed façade modifications and site improvements as they are compatible with the
architecture of the surroundingbuildingsand facilitate the use of the building for church use.
Tree Removals
The applicant also proposes to remove three(3)ornamental treesthat are part of an approved landscape
planand are affected by the enlarged front entry of the church. The arborist report identifies them as two
American Sweet Gumswith 19 and 12 inch diameters(tree nos. 2201 & 2234) and a White Birchwith a 13
inch diameter(tree no. 2235). The applicant is proposing to replacethe removed trees with five 15-gallon
silk trees (Albizia julibrissin). To comply with the City’s Protected Tree Ordinance, staff is recommending
the replacement trees be up-sized to 24-inch box specimens. The replacement trees would be located in
the southern parking lot, which presently does not have landscaping features.The trees grow to
moderate height with broad crowns.
ASA-2015-17, TR-2015-33 Home of Christ Church August13, 2015
Page 3
Outreach/Noticing
The following table is a brief summary of the noticing done for this project:
Notice of Public Hearing, Legal Ad Agenda
Legal ad placed in newspaper (at least 10
days prior to the hearing)
Notices mailed to property owners adjacent
to the project site (10 days prior to the hearing)
Posted on the City's official notice
bulletin board (one week prior to the
hearing)
Posted on the City of Cupertino’sWeb
site (one week prior to the hearing)
No public comments were received at the time of staff report production.
PERMIT STREAMLINING ACT
This project is subject to the Permit Streamlining Act (Government Code Section 65920 –65964). The
City has complied with the deadlines found in the Permit Streamlining Act.
Project Received: July 16,2015
Deemed Complete:July 30, 2015
The City has 60 days (until September 30, 2015) to make a decision on the project since this project is
Categorically ExemptfromCEQA.The Hearing Officer’s decision on this project is final unless appealed
to the Planning Commissionwithin 14 calendar days of the decision.
CONCLUSION
Staff recommends approval of the Architectural and Site Applicationand Tree RemovalPermit,since the
plansand conditions of approvalsaddress all concerns related to the proposed project.Additionally, all of
the findings for approval of the proposed project, are consistent with Chapter 19.168and 14.18of the
Cupertino Municipal Code.
Submittedby:Gian Paolo Martire, AssistantPlanner
Attachments
DraftResolutionASA-2015-17
Draft Resolution TR-2015-33
Arborist Report prepared by Michael L. Bench dated May 6, 2014
Plan Set
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
DRAFT RESOLUTION
OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO
TO ALLOW AN ARCHITECTURAL AND SITE APPROVAL FOR MINOR BUILDING
FAÇADE MODIFICATIONS AND SITE IMPROVEMENTS AT THE HOME OF CHRIST
CHURCH LOCATED AT 10420 BUBB ROAD
SECTION I: PROJECT DESCRIPTION
Application No.: ASA-2015-17
Applicant: Kevin Chiang (Home of Christ Church)
Location: 10420 Bubb Road (APN 357-20-038)
SECTION II: FINDINGS
WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an application for an
Architectural and Site Approval permit as described in Section I. of this Resolution; and
WHEREAS, the project is categorically exempt from the California Environmental Quality Act (CEQA);
WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the
City of Cupertino, and the Administrative Hearing Officer held a public meeting on August 13, 2015 in
regard to the application; and
WHEREAS, the Administrative Hearing Officer finds:
1. The proposal, at the proposed location, will not be detrimental or injurious to property or
improvements in the vicinity, and will not be detrimental to the public health, safety, general
welfare, or convenience;
The façade modifications of a building located in an established industrial office park in an industrial zone will
be installed and constructed pursuant to the requirements of the California Building Code with the proper
building permits. The building modifications affect only the subject building and will not be detrimental or
injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety,
general welfare, or convenience.
2. The proposal is consistent with the purposes of Chapter 19.168, Architectural and Site Review, of the
Cupertino Municipal Code, the General Plan, any specific plan, zoning ordinances, applicable
planned development permit, conditional use permits, variances, subdivision maps or other
entitlements to use which regulate the subject property including, but not limited to, adherence to
the following specific criteria:
a) Abrupt changes in building scale have been avoided. A gradual transition related to height and
bulk has been achieved between new and existing buildings.
Draft Resolution ASA-2015-17 August 13, 2015
Page 2
The façade modifications are compatible with the scale of the building and the architecture of the
surrounding industrial/office buildings. Therefore, there will be no abrupt changes in building scale and
no new buildings are being proposed.
b) Design harmony between new and existing buildings has been preserved and the materials,
textures and colors of new buildings harmonize with adjacent development with design and
color schemes, and with the future character of the neighborhood and purposes of the zone in
which it is situated. The location, height and materials of walls, fencing, hedges and screen
planting harmonize with adjacent development. Unsightly storage areas, utility installations and
unsightly elements of parking lots have been concealed. Ground cover or various types of
pavements have been used to prevent dust and erosion, and the unnecessary destruction of
existing healthy trees has been avoided. Lighting for development is adequate to meet safety
requirements as specified by the engineering and building departments and shielding to
adjoining property owners.
The façade modifications are harmonious with the existing buildings in the industrial park and will not
impact adjoining properties. Proposed trash areas will be enclosed and roofed. Additional landscaping is
being proposed to soften the existing parking lot to the south. New lighting sources are shielded but there
are no adjacent residential developments that will be impacted.
c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs
and structures shall minimize traffic hazards and shall positively affect the general appearance of
the neighborhood and harmonize with adjacent development.
No additional signage is being proposed with these building and site improvements.
d) This new development, within an existing residential neighborhood, has been designed to
protect residents from noise, traffic, light and visually intrusive effects by use of buffering,
setbacks, landscaping, walls and other appropriate design measures.
There is no existing residential neighborhood that would be affected by this development.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of the maps, facts, exhibits, testimony and other evidence submitted in
this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 3
thereof, the application for an Architectural and Site Approval, Application no. ASA-2015-17, is hereby
approved, and
That the subconclusions upon which the findings and conditions specified in this Resolution are based
and contained in the Public Meeting record concerning Application no.(s) ASA-2015-17 as set forth in the
Minutes of Administrative Hearing Meeting of August 13, 2015, and are incorporated by reference as
though fully set forth herein.
Draft Resolution ASA-2015-17 August 13, 2015
Page 3
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT
DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the plan set entitled “TI and Site Improvement, The Home of Christ
Church in Cupertino, 10420 Bubb Rd, Cupertino Ca.”, consisting of six (6) sheets labeled A1
through A7 drawn by Kevin Chiang, AIA, except as may be amended by conditions in this
resolution.
2. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data including but
not limited to property boundary locations, building setbacks, property size, building square
footage, any relevant easements and/or construction records. Any misrepresentation of any
property data may invalidate this approval and may require additional review.
3. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the first page of
the building plans.
4. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file no. TR-2015-33 shall be applicable to this approval.
5. BICYCLE PARKING
The applicant shall provide bicycle parking and bike racks for the proposed project in accordance
with the City’s Parking Regulations under Chapter 19.124 of the Cupertino Municipal Code.
6. DEMOLITION REQUIREMENTS
All demolished building and site materials shall be recycled to the maximum extent feasible subject
to the Building Official. The applicant shall provide evidence that materials were recycled prior to
issuance of final demolition permits.
7. TREE REPLACEMENT
The applicant shall provide adequate tree replacements for trees proposed to be removed in
conjunction with the proposed project. The number, location and type of trees shall be incorporated
into the detailed landscape plan to be reviewed and approved by the Director of Community
Development.
8. FINAL ARCHITECTURAL DETAILS
The final building design and exterior treatment plans shall be reviewed and approved by the
Director of Community Development prior to issuance of building permits. The Director of
Community Development may approve additional designs or make minor variations as deemed
appropriate. The final building exterior plan shall closely resemble the details shown on the
originally approved plans. Any exterior changes determined to be substantial by the Director of
Community Development shall require a modification approval.
9. FINAL LANDSCAPE DETAILS
Draft Resolution ASA-2015-17 August 13, 2015
Page 4
The applicant shall submit detailed landscape and irrigation plans to be reviewed and approved by
Community Development Director prior to issuance of building permits. The landscape plan shall
include water conservation and pesticide reduction measures in conformance with Chapter 14.15,
Xeriscape Landscaping, and the pesticide control measures referenced in Chapter 9.18, Stormwater
Pollution Prevention and Watershed Protection, of the Cupertino Municipal Code.
10. TRANSFORMERS
New electrical transformers, telephone cabinets and similar equipment shall be placed in
underground vaults. The developer must receive written approval from both the Public Works
Department and the Community Development Department prior to installation of any above ground
equipment. Should above ground equipment be permitted by the City, equipment and enclosures
shall be screened with fencing and landscaping such that said equipment is not visible from public
street areas, as determined by the Community Development Department. Transformers shall not be
located in the front setback area.
11. UTILITY STRUCTURE PLAN
Prior to issuance of building permits, the applicant shall work with staff to provide a detailed utility
plan to demonstrate screening or undergrounding of all new utility structures [including, but not
limited to backflow preventers (BFP), fire department connections (FDC), post-indicator valves (PIV),
and gas meters] to the satisfaction of the Director of Community Development, Public Works, Fire
Department, and applicable utility agencies.
12. MECHANICAL SCREENING
All mechanical and other equipment on the building or on the site shall be screened so they are not
visible from public street areas or adjoining developments. Screening materials/colors shall match
building features and materials. The height of the screening shall be taller than the height of the
mechanical equipment that it is designed to screen. The screening area shall be proportional to the
amount of rooftop equipment needing visual screening. Large gaps and awkward screen angles shall
be avoided. The location of equipment and necessary screening shall be reviewed and approved by
the Director of Community Development prior to issuance of building permits.
13. LANDSCAPE INSTALLATION REPORT
The project is subject to all provisions delineated in the Landscape Ordinance (CMC, Chapter 14.15).
A landscape installation audit shall be conducted by a certified landscape professional after the
landscaping and irrigation system have been installed. The findings of the assessment shall be
consolidated into a landscape installation report.
The landscape installation report shall include, but is not limited to: inspection to confirm that the
landscaping and irrigation system are installed as specified in the landscape and irrigation design
plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that
causes overland flow, and preparation of an irrigation schedule.
The landscape installation report shall include the following statement: “The landscape and
irrigation system have been installed as specified in the landscape and irrigation design plan and
complies with the criteria of the ordinance and the permit.”
Draft Resolution ASA-2015-17 August 13, 2015
Page 5
14. LANDSCAPE AND IRRIGATION MAINTENANCE
Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be established and
submitted to the Director of Community Development or his/her designee, either with the landscape
application package, with the landscape installation report, or any time before the landscape
installation report is submitted.
a. Schedules should take into account water requirements for the plant establishment period and
water requirements for established landscapes.
b. Maintenance shall include, but not be limited to the following: routine inspection; pressure
testing, adjustment and repair of the irrigation system; aerating and de-thatching turf areas;
replenishing mulch; fertilizing; pruning; replanting of failed plants; weeding; pest control; and
removing obstructions to emission devices.
c. Failed plants shall be replaced with the same or functionally equivalent plants that may be size-
adjusted as appropriate for the stage of growth of the overall installation. Failing plants shall
either be replaced or be revived through appropriate adjustments in water, nutrients, pest control
or other factors as recommended by a landscaping professional.
15. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with regard to the
proposed project for additional conditions and requirements. Any misrepresentation of any
submitted data may invalidate an approval by the Community Development Department.
16. INDEMNIFICATION
To the extent permitted by law, the Applicant shall indemnify and hold harmless the City, its
City Council, its officers, employees and agents (the “indemnified parties”) from and against any
claim, action, or proceeding brought by a third party against the indemnified parties and the
applicant to attack, set aside, or void this or any permit or approval authorized hereby for the
project, including (without limitation) reimbursing the City its actual attorneys’ fees and costs
incurred in defense of the litigation. The City may, in its sole discretion, elect to defend any such
action with attorneys of its choice.
17. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees, dedication
requirements, reservation requirements, and other exactions. Pursuant to Government Code
Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of
such fees, and a description of the dedications, reservations, and other exactions. You are hereby
further notified that the 90-day approval period in which you may protest these fees, dedications,
reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If
you fail to file a protest within this 90-day period complying with all of the requirements of
Section 66020, you will be legally barred from later challenging such exactions.
Draft Resolution ASA-2015-17 August 13, 2015
Page 6
PASSED AND ADOPTED this 13th day of August, 2015 at a noticed Public Meeting of the
Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of
Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section
19.12.120.
ATTEST: APPROVED:
Gian Martire Gary Chao
Assistant Planner Asst. Director of Community Development
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
DRAFT RESOLUTION
OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO TO ALLOW
THE REMOVAL AND REPLACEMENT OF THREE TREES: 2 AMERICAN SWEET GUMS
AND 1 WHITE BIRCH THAT ARE PART OF AN APPROVED LANDSCAPE PLAN FOR
THE HOME OF CHRIST CHURCH AT 10420 BUBB ROAD
SECTION I: PROJECT DESCRIPTION
Application No.: TR-2015-33
Applicant: Kevin Chiang (Home of Christ Church)
Location: 10420 Bubb Road (APN 357-20-038)
SECTION II: FINDINGS
WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an application for a
Tree Removal Permit as described in Section I. of this Resolution; and
WHEREAS, the project is categorically exempt from the California Environmental Quality Act (CEQA);
WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the
City of Cupertino, and the Administrative Hearing Officer held a public meeting on August 13, 2015 in
regard to the application; and
WHEREAS, the Administrative Hearing Officer finds:
1. That the location of the trees restricts the economic enjoyment of the property by severely
limiting the use of property in a manner not typically experienced by owners of similarly zoned and
situated property, and the applicant has demonstrated to the satisfaction of the approval authority that
there are no reasonable alternatives to preserve the tree(s).
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of the maps, facts, exhibits, testimony and other evidence submitted in
this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 2
thereof, the application for Tree Removal, Application no. TR-2015-33, is hereby approved, and
That the subconclusions upon which the findings and conditions specified in this Resolution are based
and contained in the Public Meeting record concerning Application no.(s) TR-2015-33 as set forth in the
Minutes of Administrative Hearing Meeting of August 13, 2015, and are incorporated by reference as
though fully set forth herein.
Draft Resolution TR-2015-33 August 13, 2015
Page 2
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT
DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the plan set entitled “TI and Site Improvement, The Home of Christ
Church in Cupertino, 10420 Bubb Rd, Cupertino Ca.”, consisting of six (6) sheets labeled A1
through A7 drawn by Kevin Chiang, AIA, and an arborist report prepared by Michael L. Bench
dated May 6, 2014, except as may be amended by conditions in this resolution.
2. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data including but
not limited to property boundary locations, building setbacks, property size, building square
footage, any relevant easements and/or construction records. Any misrepresentation of any
property data may invalidate this approval and may require additional review.
3. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the first page of
the building plans.
4. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file no. ASA-2015-17 shall be applicable to this approval.
5. TREE REPLACEMENT
The applicant shall provide adequate tree replacements for trees proposed to be removed in
conjunction with the proposed project. The number, location and type of trees are incorporated into
the approved landscape plan, which is amended to increase the planting tree size to 24-inch box
specimens for all five replacement trees.
6. FINAL LANDSCAPE DETAILS
The applicant shall submit detailed landscape and irrigation plans to be reviewed and approved by
Community Development Director prior to issuance of building permits. The landscape plan shall
include water conservation and pesticide reduction measures in conformance with Chapter 14.15,
Xeriscape Landscaping, and the pesticide control measures referenced in Chapter 9.18, Stormwater
Pollution Prevention and Watershed Protection, of the Cupertino Municipal Code.
7. LANDSCAPE INSTALLATION REPORT
The project is subject to all provisions delineated in the Landscape Ordinance (CMC, Chapter 14.15).
A landscape installation audit shall be conducted by a certified landscape professional after the
landscaping and irrigation system have been installed. The findings of the assessment shall be
consolidated into a landscape installation report.
The landscape installation report shall include, but is not limited to: inspection to confirm that the
landscaping and irrigation system are installed as specified in the landscape and irrigation design
plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that
causes overland flow, and preparation of an irrigation schedule.
Draft Resolution TR-2015-33 August 13, 2015
Page 3
The landscape installation report shall include the following statement: “The landscape and
irrigation system have been installed as specified in the landscape and irrigation design plan and
complies with the criteria of the ordinance and the permit.”
8. LANDSCAPE AND IRRIGATION MAINTENANCE
Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be established and
submitted to the Director of Community Development or his/her designee, either with the landscape
application package, with the landscape installation report, or any time before the landscape
installation report is submitted.
a. Schedules should take into account water requirements for the plant establishment period and
water requirements for established landscapes.
b. Maintenance shall include, but not be limited to the following: routine inspection; pressure
testing, adjustment and repair of the irrigation system; aerating and de-thatching turf areas;
replenishing mulch; fertilizing; pruning; replanting of failed plants; weeding; pest control; and
removing obstructions to emission devices.
c. Failed plants shall be replaced with the same or functionally equivalent plants that may be size-
adjusted as appropriate for the stage of growth of the overall installation. Failing plants shall
either be replaced or be revived through appropriate adjustments in water, nutrients, pest control
or other factors as recommended by a landscaping professional.
9. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with regard to the
proposed project for additional conditions and requirements. Any misrepresentation of any
submitted data may invalidate an approval by the Community Development Department.
10. INDEMNIFICATION
To the extent permitted by law, the Applicant shall indemnify and hold harmless the City, its
City Council, its officers, employees and agents (the “indemnified parties”) from and against any
claim, action, or proceeding brought by a third party against the indemnified parties and the
applicant to attack, set aside, or void this or any permit or approval authorized hereby for the
project, including (without limitation) reimbursing the City its actual attorneys’ fees and costs
incurred in defense of the litigation. The City may, in its sole discretion, elect to defend any such
action with attorneys of its choice.
11. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees, dedication
requirements, reservation requirements, and other exactions. Pursuant to Government Code
Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of
such fees, and a description of the dedications, reservations, and other exactions. You are hereby
further notified that the 90-day approval period in which you may protest these fees, dedications,
reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If
you fail to file a protest within this 90-day period complying with all of the requirements of
Section 66020, you will be legally barred from later challenging such exactions.
Draft Resolution TR-2015-33 August 13, 2015
Page 4
PASSED AND ADOPTED this 13th day of August, 2015 at a noticed Public Meeting of the
Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of
Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section
19.12.120.
ATTEST: APPROVED:
Gian Martire Gary Chao
Assistant Planner Asst. Director of Community Development