15070119s
CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 10913 NORTHFIELD SQ
CONTRACTOR: VALLEY HEATING &
PERMIT NO: 15070119
COOLING
OWNER'S NAME: KAMBLI RAJIV AND PESHNE PRAJAKTA
1171 N 4TH ST
DATE ISSUED: 07/23/2015
OWNER'S PHONE: 4084294994
SAN JOSE, CA 95112
PHONE NO: (408)294-6290
LICENSED CONTRACTOR'S DECLARATION
JOB DESCRIPTION: RESIDENTIAL L] COMMERCIAL
�/ �j
�� U �10 f U
INSTALL (N) A/C UNIT (2.5 TONS, 14 SEER) NEAR
FURNACE
License Class Lic. # (�
PATIO AND INSTALL (1� FORCED AIR (80
��,% �r %`
U� 1 �Q `���� t C ""Oath 2 T` (r
AFUE,
Contractor y
70K BTU) IN (E) LOCATION IN GARAGE
I hereby affirm that I am licensed under the provisions of Chapter 9
(commencing with Section 7000) of Division 3 of the Business & Professions
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self -insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
Sq. Ft Floor Area:
Valuation: 58413 S
performance of the work for which this permit is issued.
I have and will maintain Worker's Compensation Insurance, as provided for by
,Section 3700 of the Labor Code, for the performance of the work for which this
APN Number: 31637022.00
Occupancy Type:
permit is issued.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is
PERMIT EXPIRES IF WORK IS NOT STARTED
correct. I agree to comply with all city and county ordinances and state laws relating
WITHIN 180 DAYS OF PERMIT ISSUANCE OR
to building construction, and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We) agree to save
180 WS FROM LAST CALLED INSPE TION.
indemnify and keep harmless the City of Cupertino against liabilities, judgments,
costs, and expenses which may accrue against said City in consequence of the
Issued by: Date: 3
granting of this permit. Additionally, the applicant understands and will comply
with all non -point sourc regulations per the Cupertino Municipal Code, Section
RE -ROOFS:
9.18.
7 //f
Signature Date (
All roofs shall be inspected prior to any roofing material being installed. If a roof is
installed without first obtaining an inspection, I agree to remove all new materials for
inspection.
❑ OWNER -BUILDER DECLARATION
Signature of Applicant: Date:
I hereby affirm that I am exempt from the Contractor's License Law for one of
the following two reasons:
ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER
1, as owner of the property, or my employees with wages as their sole compensation,
will do the work, and the structure is not intended or offered for sale (Sec.7044,
Business & Professions Code)
I, as owner of the property, am exclusively contracting with licensed contractors to
HAZARDOUS MATERIALS DISCLOSURE
construct the project (Sec.7044, Business & Professions Code).
I have read the hazardous materials requirements under Chapter 6.95 of the
California Health & Safety Code, Sections 25505, 25533, and 25534. 1 will
I hereby affirm under penalty of perjury one of the following three
maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the
declarations:
Health & Safety Code, Section 25532(x) should I store or handle hazardous
I have and will maintain a Certificate of Consent to self -insure for Worker's
material. Additionally, should I use equipment or devices which emit hazardous
Compensation, as provided for by Section 3700 of the Labor Code, for the
air contaminants as defined by the Bay Area Air Quality Management District I
performance of the work for which this permit is issued.
will maintain compliance with the Cu erti Municipal Code, Chapter 9.12 and
1 have and will maintain Worker's Compensation Insurance, as provided for by
the Health & Safety Code, Sections 05, 25533, and 25534.
Section 3700 of the Labor Code, for the performance of the work for which this
Owner or authorized agent: Dater
permit is issued.
I certify that in the performance of the work for which this permit is issued, I shall
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of California. If, after making this certificate of exemption, I
CONSTRUCTION LENDING AGENCY
become subject to the Worker's Compensation provisions of the Labor Code, I must
I hereby affirm that there is a construction lending agency for the performance of
forthwith comply with such provisions or this permit shall be deemed revoked.
work's for which this permit is issued (Sec. 3097, Civ C.)
Lender's Name
APPLICANT CERTIFICATION
Lender's Address
I certify that I have read this application and state that the above information is
correct. I agree to comply with all city and county ordinances and state laws relating
to building construction, and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We) agree to save
ARCHITECT'S DECLARATION
indemnify and keep harmless the City of Cupertino against liabilities, judgments,
costs, and expenses which may accrue against said City in consequence of the
I understand my plans shall be used as public records.
granting of this permit. Additionally, the applicant understands and will comply
with all non -point source regulations per the Cupertino Municipal Code, Section
Licensed Professional
9.18.
Signature Date
GENERAL PERMIT APPLICATION [50 -01Iq
COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3228 • FAX (408) 777-3333 • buildina(a)cupertino.oro
CUPERTINO
❑ PLUMBING ❑ MECHANICAL ❑ ELECTRICAL ❑ MISCELLANEOUS
PROJECT ADDRESS (�
Nbr+�
�• E-MAIL
OWNER NAME J lr. n C� ^ n PTD
V`
STREET.ADDRESS O -3 n' � f L' _ /�l�J �( e
1 "lj�
CITY, S"TE,� $q� �� / L/ FAX —
C (
CONTACT NAME ��ruCr < PHONE E-MAIL
STREET ADDRESS
CITY, STATE, ZIP
FAX
❑ OWNER ❑ OWNER -BUILDER ❑ OWNER AGENT ❑ CONTRACTOR ❑COhTRACTORAGENT ❑ ARCHITECT ❑ ENGINEER ❑ DEVELOPER ❑ TENANT
CONTRACTOR NADA i
l
LICENSE 1 [JI IDERq ( I ) \
(�J�
LICENSE TYTE
BUS. LIC #
COMPANY NAME
E-MAILU V7
FAX
STREET ADDRESS I I
CITY, STATE ZIP % s o f
1/
PHONE9 6 `, (� 2 � O
I t
ARCMTECT/ENGINEER NAME
LICENSE NUMBER
BUS. LIC R
COMPANY NAME
E-MAIL
FAX
STREET ADDRESS
CITY, STATE, ZIP
PHONE
USE OF ❑ SFD or DUPLEX ❑ MULTI -FAMILY PROJECT IN WILDIAND ❑ YES
BUADING: ❑ COMMERCIAL URBAN'' INTERFACE AREA ❑ NO
PROJECT IN ❑ YES
FLOOD ZONE ❑ NO
IS THE BLDG AN ❑ YES
EICHLER HOME? ❑ NO
DESCRIPTION OF WORK ASIA
So 4FvE -7ok- 07u1
TOTAL VALUATION: 3 J2ECE'., _ ':.: / V k
By my signature below, I cJ fy to Jach of the following: I am the property owner or authorized agent to act on the p ope, y owner's behalf. i have read this
application and the information I have provid s correct I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local
ordinances and state laws relating to build in n tion. I a/representatives of Cupertino to enter the above-' e ti ed�� f inspection purposes.
Signature of Applicant/Agent: � 1 � `' Date: _ 7-
SUPPLEMENTAL INFORMATION REQUIRED
OFFICE: USS ONL. l
0VEI.-TI E-COUNTI-1,
-
EAPF:I;SS
Z
--
U 1J(7R
MEPATiSCAPP_2011.doc remised 06121/11
§F_M7
CITY OF CUPERTINO (5 vl (q
FEE ESTIMATOR - BUILDING DIVISION
9a,
ADDRESS: 10913 Northfield Sq.
DATE: 07/23/2015
REVIEWED BY: Paul
EMN
APN: 316 37 022
BP#:
*VALUATION: 1$8,435
.'PERMIT TYPE: Mechanical Permit
PLAN CHECK TYPE: Alteration / Addition / Repair
PRIMARY SFD or Duplex
USE:
#
PENTAMATION FURN/AC
PERMIT TYPE:
WORK
Install N A/C Unit 2.5 Tons 14 SEER near Patio and Install N Forced Air Furnace 80 AFUE 70K
SCOPE
BTU) in (E) location in garage
APPLIANCE / EQUIP TYPE
FEE ID
"ht :1,. flan G:ec�/.
QTY
UNITS
BP FEES
L'lec. PermitF'ee:
A/C Units (<=10K cfm)
1 BREMAIR
Other Elec. Insp Li
1
#
$72
Furnace, Forced -Air
1MFR=<100
irppl. Insp Fee
1
#
$143
PME Unit Fee:
$215.00
PME Permit Fee:
$48.00
onstruct l (.m 14n.
Administrative Fee: ]ADMIN
$45.00
Work Without Permit? O Yes (F) No
$0.00
TOTALS:
Travel Documentation Fee: ITRA VDOC
$215.00
Strom/ Motion Fee: IBSEISMICR
NOTE: This estimate does not include fees due to other Departments (i.e. Planning, Public Works, Fire, Sanitary Sewer District, School
District. etc.). These fees are based on the preliminary information available and are only an estimate. Contact the Dept for addn7 info.
FEE ITEMS (Fee Resolution I1-053 ET. 7/1/13)
Mech. Plan Check 0.0 1 hrs $0.00
"ht :1,. flan G:ec�/.
I-3ec, Platt Check
Mech. Permit Fee: IMPERMIT
!'lamb. ;
L'lec. PermitF'ee:
Other Mech. Insp. 0.0 hrs $48.00
)Ater Plumb ]/Isle.
Other Elec. Insp Li
11.. h /u'p_ h ;
i'ltrmb. Insp. /` :
klec. Insp. Nee
NOTE: This estimate does not include fees due to other Departments (i.e. Planning, Public Works, Fire, Sanitary Sewer District, School
District. etc.). These fees are based on the preliminary information available and are only an estimate. Contact the Dept for addn7 info.
FEE ITEMS (Fee Resolution I1-053 ET. 7/1/13)
FEE
QTY/FEE
MISC ITEMS
Plast Check I%ee:
'� uppl. PC Fee
PME Plan Check:
$0.00
'<rmit Fee:
irppl. Insp Fee
PME Unit Fee:
$215.00
PME Permit Fee:
$48.00
onstruct l (.m 14n.
Administrative Fee: ]ADMIN
$45.00
Work Without Permit? O Yes (F) No
$0.00
I rlvoneed Planning Fees:
Travel Documentation Fee: ITRA VDOC
$48.00
Strom/ Motion Fee: IBSEISMICR
$1.10
Select an Administrative Item
Bldg Stds Commission Fee: IBCBSC
$1.00
SUBTOTALS:
$358.10
$0.00 TOTAL FEE:
1 $358.10
Revised: 07/02/2015
STATE OF CALIFORNIA
ALTERATIONS - HVAC
CEC-CFIR-ALT-03-E Revised 06/14 CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE CF1R-ALT-03-E
Alterations - HVAC CZ 1, 3 to 7 and 16 (formerly CF -IR -ALT -HVAC) (Page 1 of 1)
Site Address:I
n /,7�/J,
Enforcement Agency,
2,
Daterp �%
�
Permit#:
2/3
Equipment Type
Equipment Efficiency
New: Ducting, Plenums, Lineset
Required R -value
Conditioned
Floor Area (sq ft)
Thermostat
❑Packaged System
Evaporator Coil
•
JAFUE
COP
❑ R-6 XZ 1,3-7) Ducts
❑ R-8' (CZ 16) Ducts
Served by system
��_sq ft
Setback
(If not already
❑ Split System
Condensing Unit
SEER
HSPF
❑ R-6 (all CZ's) Plenums
present, must
Furnace
❑ Lineset
EER
❑ R-5 or R7.5 Lineset'
be installed)
HERS VERIFICATION SUMMARY Installer determines work to be completed and matches to one of the options below. At permit application this
form is allowed to be filled out by hand. For final inspection all forms are to be registered (no hand filled forms allowed) and a copy left on site.
1. HVAC Changeout/Repair
Required Compliance Documents to be left on site for Final:
Can include new ducting
All Equipment,
CF1R-ALT-02-E
Condenser Unit, Evaporator Coil,
CF2R: MECH-01, MECH-20-HERS
Air Handler/Furnace
CF3R: MECH-20-HERS
Installer Requirement: Duct leakage (:L15% or, < 10% to outside, or seal all accessible leaks)
Exempted from duct leakage testing if:
❑ 1. Duct system registered with HERS provider as previously sealed, or 112. There is less than 40 linear feet of duct in unconditioned
space, or ❑ 3. Existing duct systems are constructed, insulated or sealed with asbestos (list manufacture date of building
❑ 2. New HVAC System
Required Compliance Documents to be left on site for Final:
All new equipment and All New Ducts'
CF1R-ALT-02-E
CF2R-MECH-01, MECH-20-HERS, MECH-22-HERS, MECH-(23 or 24) -HERS
CF3R-MECH-20-HERS, MECH-22-HERS, MECH-(23 or 24) -HERS'
Installer Requirement: Duct leakage < 6%, Fan Efficacy (.58W/CFM), Air Flow >_ 350 CFM/ton (or Standards Table 150.G -C/ D alternative)
113. All New Ducts with Replacement
Required Compliance Documents to be left on site for Final:
Includes replacing or installing All New
CF1R-ALT-02-E
Ducts' and one or more of the following:
CF2R-MECH-01, MECH-20-HERS, MECH-(23 or 24) -HERS
Condenser Unit, Evaporator Coil, Furnace
CF3R-MECH-20-HERS, MECH-(23 or 24) -HERS
Installer Requirement: Duct leakage < 6%, Air Flow >_ 350 CFM/ton (or Standards Table 150.0-C / D alternative)
❑ Exempted from duct leakage testing I existing duct systems are constructed, insulated or sealed with asbestos.
❑ 4. New Ducting over 40 feet
Required Compliance Documents to be left on site for Final:
Adding or replacing ducts in unconditioned
CF1R-ALT-02-E
CF2R: MECH-20-HERS
space but less than All New Ducts'
CF3R: MECH-20-HERS
Installer Required to: Duct leakage I<15% or, < 10% to outside, or seal all accessible leaks)
❑ Exempted from duct leakage testing I existing duct systems are constructed, insulated or sealed with asbestos.
' All new ducting R-8 required when more than 40 ft installed and R-6 when less than 40 ft installed. This includes in walls, between floors etc.
2 A New Duct system is when the duct system is constructed of at least 75 percent new duct material, and up to 25 percent may consist of reused
parts from the dwelling unit's existing dud system (e.g., registers, grilles, boots, air handler, plenums, duct material.
3 R-5 (1" thick insulation) for linesets 1" and less. R-7.5 (1.5" thick insulation) for linesets over 1 inch. Most mfg will require Suction line Diameter
with insulation as the following 1.5-2T-2%", 2.5-3T-2%", 3.5 to 4T-2%", 5T-4'/."
Contractor (Documentation Author's /Responsible Designer's Declaration Statement)
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. 1 am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the information on this document.
3. That the energy features and performance specifications for the design identified on this Certificate of Compliance conform to the
requirements of Title 24, Parts 1 and 6 of the California Code of Regulations (CCR).
4. That the energy features and performance specifications, materials, components, and manufactured devices for the building design or
system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the CCR.
S. The building design features or system design features identified on this Certificate of Compliance are consistent with the information
provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement
agency for approval with this building permit application.
Responsible Designer Na e:
Respons' igner Signa/
Date Signed:
ZL
License:
Company:
Address:
Gty tate/Zip:
Phone:
For assistance or questions regarding the Energy btanaaras, contact the tnergy nomne at.-ouu-f.&-aavu
OFFICE COPY
PLANNE APPROVAL REOUIRFn
PRIOR TO F NAL' OCCUPANC
SIGNA RE, �E
COMMUNITY DEVELOPMENT DEPARTMENT
-BUILDING DIVISION - CUPERTINO
APPROVED
This. set pf plans and specifications MUST be kept at e
job site during r alterrUCt1' onn. tsamel, orfto deviate
l to make any__
charges Ofificial.-
the'refrom, without approval from the Building
The stamping of this plan and specifications SHALL NO
b h '^ �rinit"nr'tn ho an approval.of tha_viu ltrun
or Stale Law.
Of s,
119
CUPERTINO
Building Department
JUL 2 3 2015
REVIEWED FOR CODE COMPLIANCE
Reviewed By: ��
W
PLANNE APPROVAL REOUIRFn
PRIOR TO F NAL' OCCUPANC
SIGNA RE, �E
COMMUNITY DEVELOPMENT DEPARTMENT
-BUILDING DIVISION - CUPERTINO
APPROVED
This. set pf plans and specifications MUST be kept at e
job site during r alterrUCt1' onn. tsamel, orfto deviate
l to make any__
charges Ofificial.-
the'refrom, without approval from the Building
The stamping of this plan and specifications SHALL NO
b h '^ �rinit"nr'tn ho an approval.of tha_viu ltrun
or Stale Law.
Of s,
119
CUPERTINO
Building Department
JUL 2 3 2015
REVIEWED FOR CODE COMPLIANCE
Reviewed By: ��