Loading...
U-2003-01b CITY OF CUPEI\TINO City Hall 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: (408) 777-3223 FAX: (408) 777-3366 Website:. www.cupertino.org OFFICE OF THE CITY CLERK June 3, 2003 Mr. Thomas Brutting HKlTArchitects 538 Ninth Street, Suite 240 Oakland, CA 94607 Re: Consider a use permit to construct a 24-unit (21,000 square foot) expansion of the skilled nursing facility and a new 3,500 square foot Fitnessl Wellness Center at the Forum senior living facility at Rancho San Antonio, Application Nos. U-2003-01 and EA-2003-01, Thomas Brutting, HKlT Architects, 23500 Cristo Rey Drive, APN 342-54-016. A Negative Declaration is recommended, and this item is recommended for approval. Dear Mr. Brutting: At its May 19, 2003, regular adjourned meeting, the Cupertino City Council approved the use permit and adopted a negative declaration. The Use Permit conditions are as follows: 1. GENERAL PLAN AMENDMENT The proposed project will be deemed approved only upon approval of the General Plan amendment GPA-2003-01, to change the land use designation of parcels on the Forum site (APN#S - 342-53-00lthrough 342-53-259/342-54-01 through 342-54-016/342-55-001 through 342-55-045) from Residential Very Low 5-20 Acre SID to Residential Very Low 5- 20 Acre SID IBQ (Quasi-public). 2. APPROVED EXHIBITS Approval is based on plan set dated April 29, 2003, entitled "Health Care Center Expansion and Fitness Center, The Forum at Ranch San Antonio," and as amended by this resolution. 3. DEVELOPMENT APPROVAL Approval is granted for the construction of <' 24-unit (21,000 sq.ft.) Alzheimer care facility, a 3,500 square foot fitness center with a 1,200 sq.ft. storage basement and a 30-car parking lot. 4. DESIGN Prinled on Recycled Paper U-2003-01 2 a. The fitness center building shall be moved to the south and west so as not to impact the existing sycamore trees #6-9 along Via Esplendor. b. Windows - All windows shall be inset at least three inches from the exterior wall surface. c. Cornice element for circular towers - A heavy cornice element similar to the eave detail at the existing Assisted Living building shall be provided for the circular towers. d. Signage - All signage shall be consistent with the Sign Code Title 17. Alternatively, a master sign program will need to be approved by the Planning Commission. 5. CONSTRUCTION MANAGEMENT PLAN A construction management plan shall be prepared by the applicant and approved by staff prior to issuance of building permits. Staging of construction equipment shall not occur within 250 feet of any residential property. 6. LANDSCAPING a. Replacement trees - All the replacement trees shall be 36" box size minimum. b. Arborist's recommendations - The recommendations in the report by Barrie D. Coate and Associates dated May 6, 2003 shall be followed. This includes moving the fitness center to the west to prevent impact to sycamore trees #6-9, retention ofthe pine trees #26-29, protective fencing around existing trees, etc. c. Protection plan - As part of the building permit drawings, a tree protection plan shall be prepared by a landscape architect or certified arborist for the existing trees as recommended in the report from Barrie D. Coate and Associates referenced above. The tree protection shall be inspected and approved by the landscape architect prior to beginning construction. d. Tree Preservation bond - A bond in the amount of$ 115,000 for the protection of the 23 sycamore trees (#1-6, 11-25, #64-68) around the perimeter of the site shall be provided prior to issuance of building permits. 7. PARKING MANAGEMENT PLAN A parking management plan shall be prepared by the applicant that describes the parking system used by employees, residents and visitors and shall be subject to staff approval prior to final occupancy. 8. TRANSPORTATION DEMAND MANAGEMENT (TDM) MEASURES a. The applicant shall install a secured bicycle-locking device, such as a bicycle rack for at least two bicycles near the sidewalk west of the fitness center. The applicant shall also implement the following TDM measures for the project that were part of the original use permit approval for 32-U-85: b. The applicant shall provide a vanpool program for residents (for off-site trips for transfer of residents with minor medical emergencies to appropriate medical facilities off-site). c. The applicant shall provide a carpool program for employees to reduce trips due to single-occupancy vehicles. The above programs shall be approved by the Director of Community Development prior to issuance of a building permit. 9. GEOLOGICAL RECOMMENDATIONS U-2003-01 3 The approval of all structural, foundation, improvement, grading and drainage plans are subject to the recommendations and supplemental Geological criteria outlined in the review letter prepared by Cotton, Shires & Associates, Inc. and dated March 18, 2003, the Geological Investigation Update by Mactec Engineering and Consulting, Inc. report dated February 18, 2003, and Geotechnical Investigation by Earth Science Associates dated September 1988, for the project. Building plans shall include necessary revisions to comply with recommendations and updated topographic contours that accurately portray the site topography and siting. 10. NOISE ANALYSIS a. Noise abatement measures would be incorporated into the design ofthe buildings so that the interior noise level would be reduced to 45 dBA or less. Sound rated building elements may also be necessary. Pursuant to the requirements of the State Building Code, adequate mechanical ventilation must be provided so that windows maybe assumed to be closed at the discretion of the building occupants in order to control environmental noise intrusion. The building's design shall be reviewed by a qualified acoustical consultant during the design phase, and the necessary noise control treatments incorporated into the design. Usable open space would be situated at a location that provides acceptable noise levels. b. Proj ect mechanical equipment should be designed to meet the noise performance standards at the nearest residential land uses. Rooftop mechanical equipment should not generate hourly noise levels above 60 dBA Leq during the daytime or 50 dBA Leq at night. c. Additional measures shall include the following: . Avoid staging of construction equipment within 200 feet of residences and locate all stationary noise-generating construction equipment, such as air compressors and portable power generators, as far practical from existing noise sensitive receptors. Construct temporary barriers to screen stationary noise generating equipment when located in areas adjoining noise sensitive land uses. . Prohibit construction related heavy truck traffic in residential areas where feasible. . Control noise from construction workers' radios to the point where they are not audible at existing residences bordering the project site. 11. TRANSFORMERS Electrical transformers, telephone vaults, backflow preventers and similar above ground equipment enclosures shall be screened with fencing and landscaping or located underground such that said equipment is not visible from streets. Said equipment locations shall be determined prior to issuance of building permits. 12. SANITARY DISTRICT Prior to obtaining a permit for occupancy, the applicant shall provide written confirmation from the Cupertino Sanitary District that adequate capacity is available for the project or the applicant shall make the necessary improvements to ensure adequate capacity for the project. 13. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS U-2003-01 4 The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT 1. STREET WIDENING Street widening, improvements and dedications shall be provided in accordance with City Standards and specifications and as required by the City Engineer. 2. CURB AND GUTTER IMPROVEMENTS Curbs and gutters, sidewalks and related structures shall be installed in accordance with grades and standards as specified by the City Engineer. 3. STREET LIGHTING INSTALLATION Street lighting shall be installed and shall be as approved by the City Engineer. Lighting fixtures shall be positioned so as to preclude glare and other forms of visual interference to adjoining properties, and shall be no higher than the maximum height permitted by the zone in which the site is located. 4. FIRE HYDRANT Fire hydrants shall be located as required by the City. 5. TRAFFIC SIGNS Traffic control signs shall be placed at locations specified by the City. 6. STREET TREES Street trees shall be planted within the Public Right of Way and shall be of a type approved by the City in accordance with Ordinance No. 125. 7. GRADING Grading shall be as approved and required by the City Engineer in accordance with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits maybe required. Please contact Army Corp of Engineers and/or Regional Water Quality Control Board as appropriate. 8. DRAINAGE Drainage shall be provided to the satisfaction of the City Engineer. Pre and Post- development calculations must be provided to identify if storm drain facilities need to be constructed or renovated. U-2003-01 5 9. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City. 10. UNDERGROUND UTILITIES The developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate with affected utility providerr. for installation of underground utility devices. The developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the City Engineer. 11. IMPROVEMENT AGREEMENT The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, stonn drain fees, park dedication fees and fees for undergrounding of utilities. Said agreement shall be executed prior to issuance of construction permits. Fees: a. Grading Permit: $ 6% of On and Off-Site Improvement Costs b. Development Maintenance Deposit: $ 1,000.00 c. Storm Drainage Fee: TBD d. Power Cost: ** e. Map Checking Fees: f. Park Fees: N/A N/A Bonds: a. On-site Grading Bond: 100% of site improvements. - The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. ** Developer is required for one-year power cost for streetlights 12. TRANSFORMERS Electrical transformers, telephone vaults and similar above ground equipment enclosures shall be screened with fencing and landscaping or located underground such that said equipment is not visible from public street areas. 13. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMP's), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in your grading and street improvement plans. Erosion and or sediment control plan U-2003-01 6 shall be provided. Identify aU Pre-and Post development BMPs that will be installed on-site. 14. NOTICE OF INTENT (NO I)! NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT The developer shall determine if a NOli NPDES permit will be required for their site per the Notice to Developers Regarding Changes to Stormwater Regulations (attached as Exhibit A). The developer shall adhere to applicable requirements. 15, WORK SCHEDULE A work schedule shall be provided to the City to show the timetable necessary for completion of on and off site improvements. Please review conditions carefully. If you have any questions regarding the conditions of approval, please contact the Department of Community Development at 408-777-3308 for clarification. Failure to incorporate conditions into your plan set will result in delays at the plan checking stage. If development conditions require tree preservations, do not clear the site until required tree protection devices are installed. The conditions of project approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020( d)(J), these cOllditiOltS constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. Any interested person,. including the applicant, prior to seeking judicial review of the city council's decision in this matter, must first file a petition for reconsideration with the city clerk within ten days after the council's decision. Any petition so filed must comply with municipal ordinance code 92. 08, 096. The expiration date for the Use Permit is May 19, 2005. (:~&i-- Grace Johnson Deputy City Clerk cc: Community Development U-2003-01 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 6185 OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO RECOMMENDING APPROV AL OF A USE PERMIT TO CONSTRUCT A 24-UNIT (21,000 SQUARE FOOT) ALZHEIMER FACILITY AND A 3,500 SQUARE FOOT FITNESS CENTER WITH A 1,200 SQUARE FOOT STORAGE BASEMENT AT THE FORUM SITE. SECTION I: PROTECT DESCRIPTION Application: U-2003-01, EA-2003-01 Applicant (s): The Forum at Rancho San Antonio Property Location: APN#: 342-54-016 - 23500 Cristo Rey Drive SECTION II: FINDINGS WHEREAS, the Planning Commission of the City of Cupertino received an application for a Use Permit, as described in Section II of this Resolution; and WHEREAS, the necessary public notices have been given in accordance with the Procedural Ordinance of the City of Cupertino, and the Planning Commission has held one or more public hearings on this matter; and WHEREAS, the applicant has met the burden of proof required to support said application; and has satisfied the following requirements: 1. The proposed use, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; 2. The proposed use will be located and conducted in a manner in accord with the Cupertino General Plan and the purpose of this title. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in tl1is matter, application no. U-2003-01 is hereby recommended for approval; and That tl1e subcondusions upon which the findings and conditions specified in this Resolution are based and contained in the Public Hearing record concerning Application U- 2003-01, as set forth in the Minutes of the Planning Commission Meeting of May 12, 2003, and are incorporated by reference herein. Resolution No. 6185 Page 2 U-2003-01 May 12, 2003 SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. 1. GENERAL PLAN AMENDMENT The proposed project will be deemed approved only upon approval of the General Plan amendment GP A-2003-01, to change the land use designation of parcels on the Forum site (APN#S - 342-53-001through 342-53-259/342-54-01 through 342-54-016/342-55-001 through 342-55-045) from Residential Very Low 5-20 Acre SID to Residential Very Low 5-20 Acre SID /BQ (Quasi-public). 2. APPROVED EXHIBITS Approval is based on plan set dated April 29, 2003, entitled "Health Care Center Expansion and Fitness Center, The Forum at Ranch San Antonio/' and as amended by this resolution. 3. DEVELOPMENT APPROVAL Approval is granted for the construction of a 24-unit (2tOOO sq.ft.) Alzheimer care facility, a 3,500 square foot fitness center with a 1,200 sq.ft. storage basement and a 30- car parking lot. 4. DESIGN a. The fitness center building shall be moved to the south and west so as not to impact the existing sycamore trees #6-9 along Via Esplendor. b. Windows - All windows shall be inset at least three inches from the exterior wall surface. c. Cornice element for circular towers - A heavy cornice element similar to the eave detail at the existing Assisted Living building shall be provided for the circular towers. d. Signage - All signage shall be consistent with the Sign Code Title 17. Alternatively, a master sign program will need to be approved by the Planning Commission. 5. CONSTRUCTION MANAGEMENT PLAN A construction management plan shall be prepared by the applicant and approved by staff prior to issuance of building permits. Staging of construction equipment shall not occur within 250 feet of any residential property. 6. LANDSCAPING a. Replacement trees - All the replacement trees shall be 36" box size minimum. b. Arborist's recommendations - The recommendations in the report by Barrie D. Coate and Associates dated May 6, 2003 shall be followed. This includes moving the fitness center to the west to prevent impact to sycamore trees #6-9, retention of the pine trees #26-29, protective fencing around existing trees, etc. c. Protection plan - As part of the building permit drawings, a tree protection plan shall be prepared by a landscape architect or certified arborist for the existing trees as recommended in the report from Barrie D. Coate and Associates referenced above. The h'ee protection shall be inspected and approved by the landscape architect prior to beginning construction. Resolution No. 6185 Page 3 U - 2003-01 May 12, 2003 d. Tree Preservation bond - A bond in the amount of $ 115,000 for the protection of the 23 sycamore trees (#1-6, 11-25, #64-68) around the perimeter of the site shall be provided prior to issuance of building permits. 7. PARKING MANAGEMENT PLAN A parking management plan shall be prepared by the applicant that describes the parking system used by employees, residents and visitors and shall be subject to staff approval prior to final occupancy. 8. TRANSPORTATION DEMAND MANAGEMENT (TDM), MEASURES a. The applicant shall install a secured bicycle-locking device, such as a bicycle rack for at least two bicycles near the sidewalk west of the fitness center. The applicant shall also implement the following TDM measures for the project that were part of the original use permit approval for 32-U-85: b. The applicant shall provide a vanpool program for residents (for off-site trips for transfer of residents with minor medical emergencies to appropriate medical facilities off-site). c. The applicant shall provide a carpool program for employees to reduce trips due to single-occupancy vehicles. The above programs shall be approved by the Director of Community Development prior to issuance of a building permit. 9. GEOLOGICAL RECOMMENDATIONS The approval of all structural- foundation, improvement, grading and drainage plans are subject to the recommendations and supplemental Geological criteria outlined in the review letter prepared by Cotton, Shires & Associates, Inc. and dated March 18, 2003, the Geological Investigation Update by Mactec Engineering and Consulting, Ine. report dated February 18, 2003, and Geoteclmical Investigation by Earth Science Associates dated September 1988, for the project. Building plans shall include necessary revisions to comply with recommendations and updated topographic contours that accurately portray the site topography and siting. 10. NOISE ANALYSIS a. Noise abatement measures would be incorporated into the design of the buildings so that the interior noise level would be reduced to 45 dBA or less. Sound rated building elements may also be necessary. Pursuant to the requirements of the State Building Code, adequate mechanical ventilation must be provided so that windows may be assumed to be closed at the discretion of the building occupants in order to control environmental noise intrusion. The building's design shall be reviewed by a qualified acoustical consultant during the design phase, and the necessary noise control u'eatrnents incorporated into the design. Usable open space would be situated at a location that provides acceptable noise levels. b. Project mechanical equipment should be designed to meet the noise performance standards at the nearest residential land uses. Rooftop mechanical equipment Resolution No. 6185 Page 4 U-2003-01 May 12, 2003 should not generate hourly noise levels above 60 dBA Leq during the daytime or 50 dBA Leq at night. c. Additional measures shall include the following: . A void staging of construction equipment within 200 feet of residences and locate all stationary noise-generating construction equipment, such as air compressors and portable power generators} as far practical from existing noise sensitive receptors. Construct temporary barriers to screen stationary noise generating equipment when located in areaS adjoining noise sensitive land uses. . Prohibit construction related heavy truck traffic in residential areas where feasible. . Control noise from construction workers' radios to the point where they are not audible at existing residences bordering the project site. 11. TRANSFORMERS Electrical transformers, telephone vaults} backflow preventers and similar above ground equipment enclosures shall be screened with fencing and landscaping or located underground such that said equipment is not visible from streets. Said equipment locations shall be determined prior to issuance of building permits. 12. SANITARY DISTRICT Prior to obtaining a permit for occupancy, the applicant shall provide written confirmation from the Cupertino Sanitary District that adequate capacity is available for the project or the applicant shall make the necessary improvements to ensure adequate capacity for the project. 13. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements} and other exactions. Pursuant to Government Code Section 66020(d) (I)} these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications} reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications} reservations} and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT 1. STREET WIDENING Street widening, improvements and dedications shall be provided in accordance with City Standards and specifications and as required by the City Engineer. 2. CURB AND GUTTER IMPROVEMENTS Curbs and gutters, sidewalks and related structures shall be installed in accordance with grades and standards as specified by the City Engineer. Resolution No. 6185 Page 5 U-2003-01 May 12, 2003 3. STREET LIGHTING INSTALLATION Street lighting shall be installed and shall be as approved by the City Engineer. Lighting fixtures shall be positioned so as to preclude glare and other forms of visual interference to adjoining properties, and shall be no higher than the maximum height permitted by the zone in which the site is located. 4. FIRE HYDRANT Fire hydrants shall be located as required by the City. 5. TRAFFIC SIGNS Traffic control signs shall be placed at locations specified by the City. 6. STREET TREES Street trees shall be planted within the Public Right of Way and shall be of a type approved by the City in accordance with Ordinance No. 125. 7. GRADING Grading shall be as approved and required by the City Engineer in accordance with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits maybe required. Please contact Army Corp of Engineers and/or Regional Water Quality Control Board as appropriate. 8. DRAINAGE Drainage shall be provided to the satisfaction of the City Engineer. Pre and Post- development calculations must be provided to identify if storm drain facilities need to be constructed or renovated. 9. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City. 10. UNDERGROUND UTILITIES The developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of th.e City of Cupertino, and shall coordinate with affected utility providers for installation of underground utility devices. The developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the City Engineer. 11. IMPROVEMENT AGREEMENT The project developer shall enter into a development agreement with the City of Cupertino providing for payment of fees, including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for under grounding of utilities. Said agreement shall be executed prior to issuance of construction permits. Resolution No. 6185 Page 6 U-2003-01 May 12, 2003 Fees: a. Grading Permit: $ 6% of On and Off-Site Improvement Costs b. Development Maintenance Deposit: $ 1,000.00 c. Storm Drainage Fee: TBD d. Power Cost: ** e. Map Checking Fees: Nj A f. Park Fees: Nj A Bonds: a. On-site Grading Bond: 100% of site improvements. -The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. ** Developer is required for one-year power cost for streetlights 12. TRANSFORMERS Electrical transformers, telephone vaults and similar above ground equipment enclosures shall be screened with fencing and landscaping or located underground such that said equipment is not visible from public street areas. 13. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMP's), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in your grading and street improvement plans. Erosion and or sediment control plan shall be provided. Identify all Pre-and Post development BMPs that will be installed on-site. 14. NOTICE OF INTENT (NOIVNATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT The developer shall determine if a NaIf NPDES permit will be required for their site per the Notice to Developers Regarding Changes to Stormwater Regulations (attached as Exhibit A). The developer shall adhere to applicable requirements. 15. WORK SCHEDULE A work schedule shall be provided to tl1e City to show the timetable necessary for completion of on and off site improvements. Resolution No. 6185 Page 7 U - 2003-01 May 12, 2003 CITY ENGINEER'S CERTIFICATE OF ACCEPTANCE OF ENGINEERING/SURVEYING CONDITIONS (Section 66474.18 of the California Govermnent Code) I hereby certify that the engineering and surveying conditions specified in Section N. Of this resolution conform to generally accepted engineering practices / s / Ralph Qualls Ralph Qualls, Director of Public Works City Engineer CA License 22046 PASSED AND ADOPTED this 12th day of May 2003, at a Regular Meeting of the Planning Commission of the City of Cupertino by the following roll call vote: AYES: NOES: ABSTAIN: ABSENT: COMMISSIONERS: Corr, Miller, Saadati, Wong and Chen COMMISSIONERS: COMMISSIONERS: COMMISSIONERS: ATTEST: APPROVED: I sl Steve Piasecki Steve Piasecki Director of Community Development Isl Angela Chen Angela Chen, Chairperson Cupertino Planning Commission G: \ PlmllliJli\ \ PD!\EPOR \ RES \ U-20()2~03 res,doc PROJCCT DESCRIPTION ::;u'les,1 T:1e :eIll~;nc'cr of -he s'te \vill be coors amerlli':::5 ~u::h os ITir~ioture ;:JI-cposed to t~e'lOI-lh of the to ilC:lJdG cur- Ict for :30 cars is fro"1 \/;a=spiencol The FCrlJmorO;ecf The pro Health Care Center Expansion & Fitness Center The Forum at Rancho San Antonio Cupertino, California Vicinity Map April 28. 2003 Herdis8r KOrl18tsu Ivelich & Tucker I 280 f\.vay ,..-~ 051'1 Hlll 200 Health Care Center Expansion & Fitness Center The Forum at Rancho San Antonio Cupertino, California Project Site and Context flcrciso!1 KCJmntsu CRIS~O REY Health Care Center Expansion & Fitness Center The Forum at Rancho San Antonio, Cupertino, California Site/Floor Pion April 22, 2003 Hardison Komatsu !velicn & Tucker lll~ IE~n Health Care Center Expansion & Fitness Center The Forum at Rancho San Antonio Cupertino, Californio Floor Plan of Addition April 78, 2003 Hmdison Komats:! Ivelich & Tucker I Health Care Center Expansion & Fitness Center The Forum at Rancho San Antonio Cupertino, ColifoTdo Perspective Sketch !aw~ry 28. 2003 HCHc'ison KomolsJ Ivelin & Tucker 'io. i I 70U11151,:::-r f,>eVAfitcN r--L-l:--t. Health Care Center Expansion & Fitness Center The rarum at Rancho San Antonio Cupertno. CalifciTio Elevations of Ilealth Core Addition )onLorv 28. 20CJ:J 'lurdison Korrotsu Ivelch & Tucker D!iJJi ~e0JrON . k"-. Health Care Center Expansion & Fitness Center The Forum at Rancho San Antonio Cuoertino, California Sections Janumy 28, 2003 Hard,son Komatsu Ivelich & Tucker 11l1'l.!9All0NNOTES t /' " ...""'1- m I \ \ \ CorJTROLL~R PR.OGIlA~MING A!JnMAINTE~IAtICE ____->~~.f~~T:a: ~~~~~~:yT~~,~~;~~~;~~~~~~:;;:~L;~P~~~;;~~T~:~~~~I~~EI~ - MINI,IJALR';i\.OFF. VERIFY TI-l".1" PROGRA!,1MING IS MATCKEDWlTH SEASONAL RAr~~FALL PERFQRW ,^'ATERAUOIT SCA$::JNAlLY DURl~;G FIRS, YEAR IJ,jD f..NNUALLY ONCE PlANTSf.RFESTABLlSHED. . SCHEDULE\'>'ATER1NG DURING EV,:NI~,GAND t,:GHT.T1ME HOURS . CHCCKSYSTEI\'. RE3ULARLY FC." OPTlM"L EFFICIErJCY. . ALL iRRlGATION TO BE ~.0'N"aLlL\<IE SPRINKLER HOADS, om? EMITTEF:SOR O:J~"LEr;: E'AITTi:RS iN t,~E!\SLFSS TH.~rJ B FL V\~DE ILl c,EN)S TO BE WITCHED PRECIPiTATION RATES WITHIN A vt,LVE :~:i'~3 IS DIVI~'~D 5Y iRRIGATICI\ lONES: Et.CH ZONE V{1LL HAve ITS OWr~ TREES WIL:.. BE IRRIGt:;-ED'Iii"'-j.., ~.~15",LERS '~,\lVI':S TO H!lVE INDIVICJ.'Il.. FL01N A~D PRESS'':,,:: CONTROLER sYS,",M WILL 1~~C-LIDl::AP.A1N SIONSCR . IF THERE IS TU:;F, MCSTURE SENsons 'MLL OE INS,AlCE::I . IRR3AjlClN HEADS AT LO'lv ELEVATlONS SHAll C1J'VI" CHFCKVALVES . POp.'J,~ SPRINKLERS iN T~jE- 'MLL BE AW'NI~'.'~M cr ':.I~~ <EIGHT (E) iFE TYPI::.A!.. }~"l SlDE"'J.LK M:Y!CIRCUl..ATi'?N PATHS --;0!~I't..Alffi:R~TH f1M'TREE ---""""SA.'<.DfJ,lI'I.ol.II ,l,:;.TSM>.E.RETAINI~rw..L IN~I>f;;;.I>.P.u.s ~ RllBfRTl1RIICOl ~ASW[:lI.llS':t<<:. Health Care Center Expansion & Fitness Center The Forum at Rancho San Antonio Cuper'ino, California Landscape Layout Pion Jorumy 28, 2003 HCHdiSOrl K~Yr~(rsu h/8licl & TlJc<.er I KEfp(el .:l1-AAA.m:. ~---i / / Hi! OIS~1l ~( ~c.oMO "'7 "'"'I ~ : .....--..........:~_.:.::- y--.::-//~ 0 .::-x:-_/~ -- -x _ ""'""'" 8) ,;~- ------- -----,.,~:>.....- ~Q9 ------- !jI ~'-.o ---..:......... 1O~X'z1..GON -- ~EAt. . . I - ~..~..~~~ ~i-jL~"'- ----- Health Care Center Expansion & Fitness Center The Forum ot Rancho San Antonio Cupertino, Ca'ifomio Landscape Planting Plan - """ IYlUDIllo'Ul"..M'3IloI1lW>,l1'I'. 1I!AI.l.'iH!!'ill>_ClIlro~ @ III.Ilf~TIUU:1;1 6A&SmUII3.L\~ lanuary 28, 2003 Harcison Komatsu Ivelich & Tucker Health Care Center Expansion & Fitness Center The Forum at Rancho San Antonio Cupertino, California CA!JFo~NIA '~(;"L 1>.'.I'2'OAL' BlJCrrYE CRAPEMYliTlE ~ E8 ~~, l"Hr "'!-If ~'H T"' tZ'~~REAO : @ RCBEr<:T LA P.GC:::A & ASSOCfA T:::S, II\'C Layout and Conceptual Planting Plan - Parking ;O.81il 28, 2003 Horaison Komalsl. Ivckh & Tuc<e. I Health Care Center Expansion & Fitness Center rhe Forum at Rancho San Antonio Cupertino, California Tree Survey and Recommendations April 28, 2003 Hcrcisc'l Kornotsu Iveiich & TJckei //--------- /' , ('~I~ ~-- , " , " '" '~,:IJi;;- , ..~5; "t~?~ ,< ,~. '" ;; ~"" <~~ i di R E~;fi ! / ,;~~~t ll~~ Health Care Center Expansion & Fitness Center The Forum at Rancho San Antonio Cupertino, California Existing Topography Survey illJ!.lIT_1ffiIE.i Silll:lM.M.K; JJ:QE1:!Q fl'f!>INE<'R'SSTA~ llCS=1,,""~Pl.oJ<"""'JEOIPIlfPMro9YLEOOlMlU< ...."""""""OI~...IHS,-_~"""'PI<.l.C1ICE- =~~1lC!: ~ ">o?~ci?-~'i' b~BkF JcnLO'Y 28, 2003 HrnJison Konatsu I'mlich ,,\ :[eker ~~l- ~'~-mMeiI 'IIIS~PlN<HASElffi<~ll'1"lIE"'",""", ~"""""""AIO<:I;IIm!STI\It;I_~,..-=oc, L-n ~r"l I c-~~ 1 _-----.-.r---'---! / / r"~ !:~Bkr Health Care Center Expansion & Fitness Center The Forum at Rancho San Antonio CuperTino, California Grading Plan january 28, 2003 Hardison Kamelsu Ivelien & Tucker