Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
AH Packet 07-09-15
CITY OF CUPERTINO AGENDA Thursday, July 9, 2015 Conference Room C ADMINISTRATIVE HEARING 5:00 PM ROLL CALL APPROVAL OF MINUTES ORAL COMMUNICATIONS (Reserved for persons wishing to address the Committee or Hearing Officer on issues that are not already included on the regular Order of Business) WRITTEN COMMUNICATIONS PUBLIC HEARING ITEMS Subject: N. Tantau visitor center and parking structure (Phase 1 Architectural and Site Approval) Recommended Action: Approve the Architectural and Site Approval, ASA-2015-15, in accordance with the Draft Resolution Description: Application No(s).: ASA-2015-15 Applicant(s): Bernard Baker (Apple, Inc) Location: 10700 N Tantau Ave Architectural and Site Approval application to review a parking structure and visitor reception area as part of a previously approved office research and development campus The Hearing Officer's decision is final unless appealed Staff Report Draft Resolution ASA-2015-15 Fourth Addendum to Final EIR Plan Set OLD BUSINESS Page 1 CITY OF CUPERTINO July 9, 2015Administrative Hearing AGENDA NEW BUSINESS ADJOURNMENT In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend the next meeting who is visually or hearing impaired or has any disability that needs special assistance should call the City Clerk's Office at 408-777-3223, 48 hours in advance of the meeting to arrange for assistance. Upon request, in advance, by a person with a disability, meeting agendas and writings distributed for the meeting that are public records will be made available in the appropriate alternative format. Also upon request, in advance, an assistive listening device can be made available for use during the meeting. Members of the public are entitled to address the members concerning any item that is described in the notice or agenda for this meeting, before or during consideration of that item. If you wish to address the members on any other item not on the agenda, you may do so during the public comment portion of the meeting. Please limit your comments to three (3) minutes or less. Page 2 CITY OF CUPERTINO ADMINISTRATIVE HEARINGSTAFF REPORT Agenda Item No.1 Agenda Date:July9, 2015 SUBJECT N. Tantau visitor center and parking structure (Phase 1 Architectural and Site Approval) RECOMMENDATION Staff recommends that the Hearing Officerapprove theArchitectural and Site Approval, ASA- 2015-15,in accordance with the Draft Resolution (Attachment 1) DESCRIPTION A.Application Summary ApplicationNo.: ASA-2015-15(EA-2011-12) Applicant:Bernard Baker Property Owner: Apple Inc. Property Location:10700 N. Tantau Avenue APNs:316-09-028 B.Project Description Architectural and Site Approval application to review a parking structure and visitor reception area as part of apreviously approved office, research and development campus. C.Project Data Summary Existing/Approved Proposed General Plan Designation Industrial/Residential No change Zoning Designation P(MP)No change Consistency with General Plan Yes Yes Consistency with Zoning Yes Yes Environmental Assessment Apple Campus 2 Final EIR (certified Oct. 15, 2013) Addendum to Final EIR prepared (Attachment 2) OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE •CUPERTINO, CA 95014-3255 (408) 777-3308 • FAX (408) 777-3333 • planning@cupertino.org ASA-2015-15 Apple Campus 2 July 9, 2015 Page 2 Existing/Approved Proposed Site Area (acres)3.45 No change Hardscape 2.06 2.28 Softscape 1.39 1.27 Total Development Area (sq.ft.)22,500 12,500 Total Building Area 22,500 12,500 Valet 10,000 0 Visitor Reception/Store 10,000 10,114 Office 2,500 0 Café 0 2,386 Employees n/a 10 1 Parking 750 800 Surface 197 116 Below-Grade 348 684 Parking Structure 205 0 Bicycle Parking (min. 5% of project wide automobile parking requirement) Project wide Required –600 Project wide Provided > 600 Setbacks Front Setback (min.)15’ 1:1 slope line on N. Tantau Consistent Street Side Setback (min.)15’Consistent Rear setback (min.)25’ Adjacent to residential zones –100’ Consistent Building Height (max.)Up to 35’beyond 150 feet from east property line Up to 16’ within 150 feet from east property line 23’ to roof level of building; 35’ to top of elevator shaftand roof deckwall(consistent) 18’6” to Elevator roof (not consistent) 1 Employees for visitor centerincluded in overall counts for sites East of Tantau and Phase 2. BACKGROUND The applicant, Apple Inc., received approval from the City Council in November 2013to demolish existing office, research and development buildings and replace them with a new office, research anddevelopment campusto be developedin two phases.The project, referred ASA-2015-15 Apple Campus 2 July 9, 2015 Page 3 to as Apple Campus 2,is located in the North Vallco Areaand encompasses approximately 176 acres. While Apple received entitlements for the entire project site, including the establishment of the building envelope for Phase 1 buildings that were not designed and Phase 2 of the project, Architectural and Site Approvalwasobtained only for the western portion of Phase 1 (west of Tantau Avenue) including the Main building, Theater, Fitness Center and main Parking Garage. At this time, Apple is seekingarchitectural reviewand approvalforthe easternportion of Phase 1of the project(see Attachment 3). This portion of Phase 1, which is referred to as Tantau Visitor Center and Parking Garage,islocated at the northeast corner of the intersection of North Tantau Avenue and Pruneridge Avenue. The surrounding land uses include: To the north, westand south: Office, research and development facilities To the east: Single family residential uses in the City of Santa Clara With the approved entitlement from November 2013and a subsequent minor modification (DIR-2014-11), this sitemay consist of up to22,500square feet of visitor center/valet reception/office and research and development areaand at least750 parking stalls. DISCUSSION Site Planand Parking The proposed project design isan improvement over the conceptual plans for the site presented to the City Council in October 2013. The main improvements include: Reduction ofthe building size from 22,500 sq.ft. to 12,500 sq.ft. Elimination ofan office component for the siteand Elimination of anabove ground parking structurebyproviding a three level below- ground parking structure. As a part of the visitor center, Apple proposes to include a 2,386 sq. ft. café and 10,114 sq. ft. retail and visitor reception area. The site will provide parking for the theateron the main campus on event days and employee parking on other days. The site will have a total of 116 surface parking spaces and 684 below grade spaces. A total of 47 electric vehicle (EV) charging stalls plus one accessible EV stalls are provided onsite. The number of parking spaces required for the entire Apple Campus 2 project wasdetermined by conducting a parking study of Apple’s current campus at Infinite Loop and properties at Mariani Avenue. The total number of spaces in the parking structure has marginally increased to 800 spaces (from 750 spaces) in order to provide parking spaces that were eliminated on the west side of the Phase 1 portion of the campus as a result of structural/building code requirements discovered through the building permit process.The main building and the main parking structure had to eliminate 38parking spaces due to structural and engineering ASA-2015-15 Apple Campus 2 July 9, 2015 Page 4 requirements. These parking spaces have been accommodated at this facility to ensure that the total number of parking spaces for Phase 1 was adequately provided. Fire access to the property will be providedvia the two driveways located on N. Tantau Avenue and Pruneridge Avenue. Reciprocal Ingress/Egress In order to relieve congestion from the surface streets, the General Plan encourages the use of reciprocal ingress/egress and shared driveways where possible. A condition has been added to the draft resolution requiring that a covenant be recorded against the property, prior to final occupancy of this project, to grant reciprocal ingress/egress to the property to the north of this site, when the City can require the same of that property. Improvements to allow this connection will need to be made by the twoparties at that time. The future cross access connection has been indicated on the plans on page P-VC-2.20. The connection will result in the loss of four parking spaces but will not have any impact on the overall required parking requirements for the project. The applicant is aware of this requirement and has no objections to this condition of approval. Sitework and Grading A moderateamount of grading is expected to occur on the project siteto accommodate the basement parking garage. The proposal does not exceed the total amount of excavation studied in the EIR(see Attachment 2). Building Architecture The architectural design for the proposed visitor centerbuildingiscompatible with the main Apple Campus 2 concept. The buildinghasa simple design ethic and featuresa mostly glass façade and anextended eave at the rooflevel, capped by a parapet atthe second level.The interior will also be illuminated via glass skylights in the roof. The parking garage is located below grade but will have access from the grade level via small glass elevator lobbies on the east side of the visitor reception/store building. Roof Deck Screening The building includes a rooftop observation deck to provide visitors with a view of the main building on the west side of N. Tantau Avenue. Screening is proposed on the east side of the roof deck to ensure that there are no views into the neighboring single family homes located in the City of Santa Clara. A condition of approval has been added to ensure that the design of the screening is reviewed and approved by the Department of Community Development prior to issuance of building permits. Glass Elevator Lobby/Overrun The original master permit for the campus development requires that any structures within 150 feet of the eastern property line be less than 16 feet in height. However, the plans indicate that two glass elevatorlobbiesand shaftsin this area are proposed to be 18’6” in height.A condition ASA-2015-15 Apple Campus 2 July 9, 2015 Page 5 of approval has been added to ensure that the plans are revised to comply with this requirementprior to building permit issuance. Utility Structures Since most of the parking is below grade, mechanical ventilation has to be provided. The ventilation shafts for the structure are proposed to be located at least 35 feet away from the property line, in the parking lot, and will be screened with metal louvers and landscaping.A condition of approval has been added to ensure that these and all other utility structures are adequately screened. Lighting The applicant proposes three different types of lighting at the site –parking lot lighting, pedestrian level lighting for pedestrian pathways and accent lighting at the plaza. The parking lotlights areclosest to the adjacent residential neighbors andwill have adequate cut-offsto ensure that there are no impacts to the neighbors. Acondition has been added for review and approval of a photometric plan prior to building permit issuance to ensure that there is no offsite glare andthat light sources are not visible. Landscaping & Fencing The proposed landscaping is consistent with the City’s requirements related to Water Efficiency. A condition has been added to ensure that a Landscape Project Submittal is submitted and approved bythe Planning Division prior to issuance of final occupancy. Existing fencing/wallalong the shared property line with the residents in the City of Santa Clara is proposed to be replaced with a new eight foot (8-foot) tall masonry wallas required by the conditions of approval of the Master Development Permit for the campus. Development Allocation The amenity space indicated on these plans (visitor center/café/store) is consistent with the existing entitlement for the project. Approved office space for the project as a whole may be converted to amenity spaces, while existing amenity space may not be converted to office space without modification of the Development Agreement approved by the City. A condition of approval has been added to restrict the conversion of any amenity spaces to non-amenity spaces without appropriate permits. The original Master Permit allowed the site to be developed with 2,500 sq. ft. of office uses which are not proposed on the site at this time. This office allocation will remain available for the Phase 1 of the campus project for use at a later time. ENVIRONMENTAL REVIEW The California Environmental Quality Act (CEQA) requires that all State and local governments consider the consequences of projects over which they have discretionary authority. The ASA-2015-15 Apple Campus 2 July 9, 2015 Page 6 Environmental Impact Report (EIR)created as a result of review under CEQA must disclose the significant environmental impacts of the project and, in addition, identify the following: Significant cumulative impacts of the project in combination with past, present and reasonably foreseeable future projects. Mitigation measures and alternatives to reduce these effects; Significant impacts that cannot be avoided; Growth-inducing impacts; and Effects found not to be significant. An EIR was prepared for Apple Campus 2 in accordance with the requirementsof CEQA. The plans indicate thatthe proposedbuildingiswithin the envelope approved previously by the City Council. The proposed plans have been evaluated by LSA Associates, Inc. in their memo dated July2, 2015,and the analysis indicates that the architectural refinements that the applicant is seeking would not require major revisions to the Final EIRcertified on October 15, 2013,due to new or substantially increased significantenvironmental effects. Furthermore, there have been no substantial changes with respect to thecircumstances under which these refinements would be undertaken that would require majorrevisions of the Final EIR due to new or substantially increased significant environmental effects, andthere has been no discovery of new information of substantial importance that would trigger orrequire major revisions to the Final EIR due to new or substantially increased significantenvironmental effects. The certified Final EIR adequately identifiesall environmental effects and adequate mitigation measures for the proposed modifications to the previously approved project. Therefore, no subsequent or supplemental EIR is required prior to approval ofthe Architectural and Site Approval of the proposedprojectdescribed above. NOTICING AND COMMUNITY OUTREACH A brief summary of outreach on the project is presented in the table below: Notice of Public Hearing, Site Notice Agenda Site Signage (10 days prior to the hearing) Adjacent noticing to neighborsalong the eastern property line and six additional properties on Meadow Avenue, south of Pruneridge Avenue (10 days prior to the hearing) Posted on the City's official notice bulletin board (one week prior to the hearing) Posted on the City of Cupertino’s Website PERMIT STREAMLINING ACT This matter is adjudicatory and is subject to the Permit Streamlining Act (Government Code Section 65920 –65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received: June 15, 2015; ASA-2015-15 Apple Campus 2 July 9, 2015 Page 7 Deemed Complete: June26, 2015 The City has 60 days (until August 25, 2015) to make a decision on the project. The Hearing Officer’s decision on this project is final unless appealed within 14 calendar days of the decision. CONCLUSION Staff recommends approval of the Architectural and Site Approval, since the plans and conditions of approval address all concerns related to the proposed project. Additionally, all of the findings for approval of the proposed project, consistent with Chapter 19.168 of the Cupertino Municipal Code, may be made as reflected in the Draft Resolution. Prepared by: Piu GhoshAICP, Senior Planner ATTACHMENTS 1.Draft Resolution ASA-2015-15 2.FourthAddendum to Environmental Impact Report dated July2, 2015 3.Plan Set ASA-2015-15 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTIONNO. OF THE ADMINISTRATIVE HEARING MEETINGOF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL PERMIT FOR A PARKING STRUCTURE AND RECEPTION AREA AS PART OF A PREVIOUSLY APPROVED OFFICE, RESEARCH AND DEVELOPMENT CAMPUS SECTION I: PROJECT DESCRIPTION Application No.:ASA-2015-15(EA-2011-12) Applicant:Bernard Baker(Apple Inc.) Property Owner:Apple, Inc. Location:10700 N. Tantau Ave (APN: 316-09-028) WHEREAS, based on substantial evidence in the administrative record, on October 15, 2013, the City Council held a public hearing to consider the approval of an office, research and development campus; and WHEREAS, after consideration of evidence contained in the entire administrative record, at the public hearing on October 15, 2013, the City Council adopted Resolution No. 13-082 certifying the EIR, adopting Findings and a Statement of Overriding Considerations, adopting Mitigation Measures, and adopting of a Mitigation Monitoring and Reporting Program; and WHEREAS, the City Council approved an office, research and development campus for Apple Inc. including entitlements for a phased development of the campus which included the development of properties along N. Tantau Avenue in separate phases; and WHEREAS, an application was received by the City (Application ASA-2015-15) for Architectural and Site approval to review a parking structure and reception area as part of a previously approved office, research and development campus;and WHEREAS, the Architectural and Site Approval is required for the previously entitled office, research and development buildings with associated parking facilities; and WHEREAS, the necessary public notices have been given asrequired by the procedural ordinances of the City of Cupertino and the Government Code, and the Administrative Hearing Office held a public meeting on November 13, 2014in regard to the applications; and Resolution No. ASA-2015-15 July 9, 2015 Page 2 NOW, THEREFORE, BE IT RESOLVED: After careful consideration ofthe, maps, facts, exhibits, testimony and other evidence submitted in this matter, the Administrative Hearing Officerhereby approves Application No. ASA-2015-15 based upon the findings described in Section II of this resolution, the administrativerecord, and subject to the conditions specified in Sections III,IV and V of this resolution. SECTION II: FINDINGS WHEREAS, the Administrative Hearing Officerfinds that: 1.The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare or convenience; The Project is designed to minimize the impact upon the surrounding community and the environment. The project has been designed to minimize its impact upon the neighbors, adjacent roads and freeways and the environment. Appropriate mitigation measures to address traffic impacts along with the implementation of an aggressive but achievable Transportation Demand Management Plan will further reduce the traffic impacts of the project. The project will be part of a corporate bike sharing program. Adequate buffer and screening has also been provided around the project to allow privacy and to reduce impacts to neighbors. The project increases the amount of landscaped green space over the existing conditions. The project will incorporate both young and mature trees, and native and drought tolerant plants, that will thrive in Santa Clara County with minimal water consumption. The project proposes to add244additional trees to the site and improvethe pervious surface areas on site therebyimproving stormwater quality and reducing run-off. Adequate emergency access has been provided on site. The design of the Project and its environmental attributes are not detrimental to the health, safety, peace, morals and general welfare of persons residing or working in the neighborhood of the subject parcels. 2.The proposal is consistent with the purposes of this chapter, the General Plan,any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: The project is in compliance with the General Plan and the Zoning regulations governing the project site. The architecture of the proposed project particularly furthers General Plan Strategy LU-3.3.1: Attractive Building and Site Design “by careful attention to building scale, mass and placement, architecture, materials, landscaping, screening of equipment and loading areas and related design considerations.” The project design incorporates several of the strategies included in this General Plan Policy including articulation and segmentation of wall and roof planes, visual openings in the wall plane, appropriate setbacks and hierarchical landscaping. While a minimal amount of parking is provided on the surface, most of the parking is instructured parking locatedunderground.The Resolution No. ASA-2015-15 July 9, 2015 Page 3 amount of parking provided is based on the amount required based on a study conducted with the original permit approved for the campus project. The parking provided on site is primarily for the corporate auditorium during event days and employee parking on non-event days. a.Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. The Project will involve the demolition of all the existing buildings on the site and the construction of new buildings. The buildings approved with this Architectural and Site Approval meet the height restrictions of the General Plan. The structureson the site meet the development regulations for the Master Plan approved for the project. The applicant is retaining existing mature trees along the rear property line shared with residences in the City of Santa Clara. These trees help screen the new buildings from the neighbors. b.In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new buildings should harmonize with adjacent development by being consistent or compatible with design andcolor schemes, and with the future character of the neighborhood and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments and provide shielding to prevent spillover light to adjoining property owners. The buildings will be visible from the public right-of-way but minimally from the neighboring properties due to the existence of mature treesand a new fencealong the property line. The project proposes to demolish all existing buildings and structures on the site and convert an outmoded business park into a world-class corporate campus with a significant increase in open space and pervious surface. The property values in the adjacent area are expected tobe maintained or enhanced due to proximity to this employment center. The walls, fencing, hedges and screen planting have been designed to minimize the impacts upon adjacent properties and to be aesthetically pleasing. Storage areas and service buildings will be shielded from view or set sufficiently back from the property line to not be visible. Permeable surface area has been increased greatly on the site in order to increase open space. The destruction of healthy trees has occurred where there are direct conflicts, but will be replaced by more trees than are removed. The lighting for the development has been designed so as to not spill over onto adjacent properties. Mature trees are being retained along the perimeter of the site and several large trees are being planted at the perimeter of the site to ensure that there is no glare and light from the development. Resolution No. ASA-2015-15 July 9, 2015 Page 4 c.The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures shall minimize traffic hazards and shall positively affect the general appearance of the neighborhood and harmonize with adjacent development. The Project approval does not propose any signage and therefore this finding does not apply to this project. However, separate signage permitapplicationswill be submittedin the future which will be reviewed, in order to minimize impact upon traffic, the general appearance of the neighborhood and harmonize with adjacent development. d.With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. The Project is designed to minimize impacts upon adjacent neighborhoods by the use of tree planting and extensive setbacksto minimize the visibility of the buildings and to ensure that light and glare do not spill onto adjacent development. The project driveways are designed to limit movement from the driveway closest to the residences into the neighborhood. The visitor reception/café and storeis located at the southernand westernedge of the property –as far away from the residences as possible. Large landscaped buffers are being proposed along the shared property lines while the buildings are setback significantly from residential developments. As described in the EIR, operational noise levels will be minimal due to both the setbacks and the nature of the operations and construction noise will be mitigated through the construction of a temporary soundwall during construction. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1.APPROVED EXHIBITS Approval is based on the plan set dated October, 2014 consisting of 53 pages labeled Title Page, P-VC-1.10, P-VC-1.20,P-VC -1.30, P-VC -1.40, P-VC -1.50, Site –Masterplan, P-VC- 2.20, P-VC-2.21, P-VC-2.40, Site –Civil, P-VC-3.00, P-VC-3.10, P-VC-3.20, P-VC-3.21, P-VC- 3.30, P-3.31, P-VC-3.40, P-VC-3.50, Site –Landscape, P-VC-4.00, P-VC-4.09, P-VC-4.10, P- VC-4.15, P-VC-4.16, P-VC-4.20, P-VC-4.30, P-VC-4.31, P-VC-4.32, P-VC-4.33, P-VC-4.40, P- VC-4.41, P-VC-4.50, P-VC-4.60, P-VC-4.70, Architecture –Visitor Center & Parking, P-VC- 5.00, P-VC-5.01, P-VC-5.02, P-VC-5.03, P-VC-5.04, P-VC-5.10, P-VC-5.20, P-VC-5.30, P-VC- 5.31, P-VC-5.53, P-VC-5.54, P-VC-5.55,P-VC-5.60, P-VC-5.70, Architecture –Visualizations, P-VC-6.00,P-VC-6.01, titled “Apple Campus 2 –Phase 1, North Tantau Ave –Site A, Site & Architectural Review, April 2015”prepared by Foster + Partners, OLIN, and Luk and Associates, except as may be amended by conditions in this resolution. 2.CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file nos. GPA-2011-03, Z-2011-03, DP-2011-04, U- 2011-11, ASA-2011-14, TM-2011-03, DA-2011-01, EA-2011-12, TR-2011-39, DIR-2014-11 shall be applicable to this approval. Resolution No. ASA-2015-15 July 9, 2015 Page 5 3.ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 4.CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departmentsand/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 5.BICYCLE PARKING The applicant shall provide bicycle parking and bike racks for the proposed project in accordance with the City’s Parking Regulations under Chapter 19.124 of the Cupertino Municipal Code. 6.INGRESS/EGRESS EASEMENT The property owner shall record an appropriate deed restriction and covenant running with the land,subject to the approval of the City Attorney, to provide the necessary reciprocal ingress and egress easements to and from the adjoining site to the northfor purposes of pedestrian and vehicular access and cross circulation as shown on the approved plans. The deed restriction and covenant shall provide that such access shall be implemented at such time as the city can require participation in shared access of the property owner to the north through a planning permit. 7.EXTERIOR BUILDING MATERIALS/TREATMENTS Final building exterior treatment plan (including but not limited to details on exterior color, material, architectural treatments and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The final building exterior plan shall closely resemble the details shown on the original approved plans, with the added required modification to incorporate measures to reduce light and privacy intrusion of the facilityon the residences to the east; such measures could include the use of opaque screening materialsto a height of sixfeet on the second floor, or some other form of screening approved by the Planning Division. Any exterior changes determined to be substantial by the Director of Community Development shall require a minor modification approval with neighborhood input. 8.GLASS ELEVATOR LOBBY/SHAFT The applicant shall reducethe height of the two glass elevator lobbies/shaft to be no taller than sixteen (16)feet in height to comply with the maximum building height allowed. Resolution No. ASA-2015-15 July 9, 2015 Page 6 9.NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90- day period complying withall of the requirements of Section 66020, you will be legally barred from later challenging such exactions. 10.LIGHTING Prior to issuance of the applicablepermitfor exterior and site lighting for the Visitor Center and Parking Garage, the applicant shall submit an outdoor lighting photometric planto the Planning Division for final review and approval. 15.UTILITY STRUCTURE PLAN Prior to issuance of building permits, the applicant shall work with staff to provide a detailed utility plan to demonstrate screening or undergrounding of all new utility structures [including, but not limited to backflow preventers (BFP), fire department connections (FDC), post-indicator valves (PIV), and gas meters] to the satisfaction of the Director of Community Development, PublicWorks, Fire Department, and applicable utility agencies. 16.SCREENING All mechanical and other equipment on the building or on the site shall be screened so they are not visible from public street areas or adjoining developments. Screening materials/colors shall match building features and materials. The height of the screening shall be taller than the height of the mechanical equipment that it is designed to screen. The location of equipment and necessary screening shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. 8.LANDSCAPE PLAN The final landscaping plan shall be reviewed and approved by the Planning Division prior to issuance of building permits. 11.LANDSCAPE INSTALLATION REPORT The project is subject to all provisions delineated in the Landscape Ordinance (CMC, Chapter 14.15). A landscape installation audit shall be conducted by a certified landscape professional after the landscaping and irrigation system have been installed. The findings of the assessment shall be consolidated into a landscape installation report. The landscape installation report shall include, but is not limited to: inspection to confirm that the landscaping and irrigation system are installed as specified in the landscapeand Resolution No. ASA-2015-15 July 9, 2015 Page 7 irrigation design plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that causes overland flow, and preparation of an irrigation schedule. The landscape installation report shall include the following statement: “The landscape and irrigation system have been installed as specified in the landscape and irrigation design plan and complies with the criteria of the ordinance and the permit.” 14.LANDSCAPE AND IRRIGATION MAINTENANCE Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be established and submitted to the Director of Community Development or his/her designee, either with the landscape application package, with the landscape installation report, or any time before the landscape installation report is submitted. a.Schedules should take into account water requirements for the plant establishment period and water requirements for established landscapes. b.Maintenance shall include, but not be limited to the following: routine inspection; pressure testing, adjustment and repair of the irrigation system; aerating and de- thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of failed plants; weeding; pest control; and removing obstructions to emission devices. c.Failedplants shall be replaced with the same or functionally equivalent plants that may be size-adjusted as appropriate for the stage of growth of the overall installation. Failing plants shall either be replaced or be revived through appropriate adjustments inwater, nutrients, pest control or other factors as recommended by a landscaping professional. 17.SOIL ANALYSIS REPORT A soils analysis report shall document the various characteristics of the soil (e.g. texture, infiltration rate, pH, soluble salt content, percent organic matter, etc) and provide recommendations for amendments as appropriate to optimize the productivity and water efficiency of the soil. The soil analysis report shall be made available to the professionals preparing the landscape and irrigation design plans in a timely manner either before or during the design process. A copy of the soils analysis report shall be submitted to the Director of Community Development as part of the landscape documentation package. 18.INDEMNIFICATION To the extent permitted by law, the applicant shall indemnify and hold harmless the City, its City Council, its officers, employees and agents (the “indemnified parties”) from and against any claim, action, or proceeding brought by a third party against the indemnified parties and the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys’ fees and costs incurred in defense of the litigation. The applicant and City shall use best efforts to select mutually agreeable legal counsel to defend such action, and the applicant shall pay all compensation for such legal counsel, following the applicant’s receipt of invoices from City, together with reasonable supporting Resolution No. ASA-2015-15 July 9, 2015 Page 8 documentation. Such compensation shall include reasonable compensation paid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. If the applicant and the City cannot in good faith agree on joint counsel, the City shall have the right to retain counsel of its own choosing, separate from the applicant’s litigation counsel. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT 19.CONCURRENT APPROVAL CONDITIONS The project shall comply with the conditions of approval required as part of the Apple Campus 2 entitlements and related amendments. 20.LEFT TURN LANE FROM TANTAU AVE Applicant shall work with the Public Works Department to establish an acceptable left- turn configuration from Tantau Avenue into the project site. This may include lengthening the left-turn pocket, modifying the intersection of Tantau Ave and Pruneridge Ave to permit U-turn movements, or other means as permitted by the Public Works Department. 21.CONNECTION TO PUBLIC STORM DRAINAGE Project must connect to the public storm drain system at manholes. Direct connections to storm drain pipes, or to the back side of drain inlets/catch basins are not permitted without written consent from the Director of Public Works. PASSED AND ADOPTED this 9th day of July, 2015 at a duly noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST:APPROVED: Piu Ghosh Aarti Shrivastava Senior Planner Directorof Community Development 7/2/15 (P:\COC1301 Apple MM\Products\Fourth Addendum\7-01-15 Fourth Addendum Site A.docx) 1 LSA ASSOCIATES, INC. 2215 FIFTH STREET BERKELEY, CALIFORNIA 94710 510.540.7331 TEL 510.540.7344 FAX CARLSBAD FRESNO IRVINE PALM SPRINGS PT. RICHMOND RIVERSIDE ROCKLIN SAN LUIS OBISPO MEMORANDUM DATE:DATE:DATE:DATE: July 2, 2015 TO:TO:TO:TO: Piu Ghosh, AICP, City of Cupertino FROM:FROM:FROM:FROM: Judith Malamut, AICP, Principal, LSA Associates, Inc. SUBJECT:SUBJECT:SUBJECT:SUBJECT: Fourth Addendum to the Apple Campus 2 Project Final Environmental Impact Report (EIR), State Clearinghouse # 2011082055 This memorandum, prepared pursuant to the California Environmental Quality Act (CEQA), is a Fourth Addendum to the certified Apple Campus 2 Project Final EIR.1 A first Addendum to the Final EIR was adopted by the City on April 9, 2014, in connection with the City’s approval of minor modifications to the dimensions, geometry and footprint of several site buildings, a reduction of parking spaces, and the addition of a Security Operations Center.2 A Second Addendum to the Final EIR was adopted by the City in September 2014 in connection with the approval of minor modifications to the Corporate Auditorium, Corporate Fitness Center, and Central Plant Equipment Yard. 3 A Third Addendum to the Final EIR was adopted by the City in November 2014 in connection with the approval of minor modifications to the Phase 2 North Tantau Avenue Sites C and D portion of the project and included revisions to the configuration of buildings, the placement of parking, and tree removal and landscaping.4 This Fourth Addendum evaluates proposed modifications to North Tantau Avenue Phase 1 Site A of the Apple Campus 2 project described in the Site and Architectural Review Application submitted to the City of Cupertino (City) by Apple Inc. (project sponsor) in June 2015.5 The project applicant is requesting Architectural and Site approval and a Tree Removal Permit for the Phase 1 Site A portion of Apple’s previously approved office, research and development campus. This application requests minor changes to the approved amount, type and location of the development, primarily: • The replacement of approximately 22,500 square feet of proposed valet reception and parking uses with a 12,500 square foot visitor center/store and parking uses (which includes valet parking); • Increasing the number of parking spaces on the site from 750 to 800, and placing 684 of those spaces under the visitor center and rather than in two-level parking structures on the site, and 116 1 LSA Associates, Inc., 2013. Apple Campus 2 Project Final Environmental Impact Report. September. 2 LSA Associates, Inc., 2014. Addendum to the Apple Campus 2 Project Final Environmental Impact Report. April 4. 3 LSA Associates, Inc., 2014. Second Addendum to the Apple Campus 2 Project Final Environmental Impact Report. September 15. 4 LSA Associates, Inc., 2014. Third Addendum to the Apple Campus 2 Project Final Environmental Impact Report. November 4. 5 Foster and Partners, 2015. Apple Campus 2 – Phase 1, North Tantau Avenue – Site A Site & Architectural Review. June. 7/2/15 (P:\COC1301 Apple MM\Products\Fourth Addendum\7-01-15 Fourth Addendum Site A.docx) 2 LSA ASSOCIATES, INC. of the parking spaces on a surface lot. The parking would continue to serve visitors, special media events held at the Apple Campus 2 theater and Apple employees. As discussed in this Fourth Addendum, the proposed minor modifications to this Phase 1 Site A portion of the project would not result in significant environmental effects beyond those identified in the Final EIR. The Final EIR evaluates the environmental impacts of development of a new campus for Apple on a 176-acre site bordered generally by East Homestead Road on the north, North Tantau Avenue on the east, Interstate 280 (I-280) and The Hamptons apartments on the south, and North Wolfe Road on the west. The project would result in the demolition of all existing structures within the project site and the construction of 3,420,000 square feet of office, research, and development uses; 245,000 square feet of auditorium, fitness center, and valet parking reception uses; 92,000 square feet of utility plants; and parking and ancillary buildings. Significant environmental impacts would result in the following topical areas: Planning Policy; Land Use; Biological Resources; Cultural Resources; Geology, Soils, and Seismicity; Hydrology and Water Quality; Hazards and Hazardous Materials; Transportation and Circulation; Noise; Air Quality; and Public Services and Utilities. This Fourth Addendum is prepared pursuant to CEQA Guidelines Section 15164 which states: “The lead agency or a responsible agency shall prepare an addendum to a previously certified EIR if some changes or additions are necessary, but none of the conditions described in Section 15162 calling for preparation of a subsequent EIR have occurred.” Section 15162 specifies that “no subsequent EIR shall be prepared for that project unless the lead agency determines … one or more of the following”: 1. Substantial changes are proposed in the project which would require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; 2. Substantial changes occur with respect to the circumstances under which the project is under- taken which would require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or 3. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete was adopted, shows any of the following: (A) The project would have one or more significant effects not discussed in the previous EIR; (B) Significant effects previously examined would be substantially more severe than shown in the previous EIR; (C) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or (D) Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environ- ment, but the project proponents decline to adopt the mitigation measure or alternative. Pursuant to CEQA Guidelines Section 15164(e), the following discussion summarizes the minor modifications proposed as part of the North Tantau Avenue Site A Application submitted on June 7/2/15 (P:\COC1301 Apple MM\Products\Fourth Addendum\7-01-15 Fourth Addendum Site A.docx) 3 LSA ASSOCIATES, INC. 2015, the potential impacts associated with the proposed minor modifications, and the reasons for the City’s conclusion that changes to the proposed project (and associated environmental effects) do not meet the conditions described in Sections 15162 and 15163 calling for preparation of a Subsequent EIR or a Supplement to an EIR. A. MINOR MODIFICATIONS TO THE PROJECT The following provides a summary of the approved development of Phase 1 Site A evaluated in the Final EIR and a description of the proposed modifications to Site A development 1. Approved Site A Development The Site A North Tantau Avenue Application identifies proposed changes to the portion of project development which is located north of Calabazas Creek, and east of North Tantau Avenue. This portion of the project was previously described in the Final EIR as valet reception/structured parking and surface parking, as shown on Figure 1. The remaining portion of the development area shown on Figure 1 is Site B located south of Site A and east of North Tantau Avenue and the Apple Campus 2 (AC2) Visitor Reception Center located west of North Tantau Avenue. Neither of these two sites are being considered in this Addendum. On Site A, the Final EIR approved up to 25,000 square feet of a two-level valet/reception and parking structure and a two-level 130,000 square-foot parking structure to house a total of 750 parking spaces. As described on pages 122 to 125 of the Apple Campus 2 Project Draft EIR, 6 development on Site A was primarily proposed to provide parking (with valet service the total parking capacity was identified as 810 spaces) during Phase 1 in the North Tantau Parking Structure and the Valet Parking Reception Structure. Parking was to be provided for registered visitors (150 spaces), non-Apple employee guests during special events (350 spaces), Apple employees visiting from other locations, and 60 valet parking spaces would be provided on a daily basis. For both structures as approved in the EIR, one level of parking would be below grade, and two levels would be above grade. Surface parking would account for 197 spaces. The number of employees that would work at Site A are assumed to be 10. Additionally, structures within the 150-foot setback of the City of Santa Clara boundary can be no taller than 16 feet in height. 2. Minor Modifications to Site A Development The proposed development, evaluated in this Addendum, would change the use from valet/reception and two parking structures to a two-story above grade visitor center/store use with surface parking and three levels of parking below the building. Other proposed site improvements include additional landscaping, a public plaza, a store, a café, a roof terrace to allow visitors to see the main building break rooms and storage area for the café and store employees, and an 8-foot tall permanent sound wall along the east property line (see page 463 of the Draft EIR and as required by the Final EIR). The proposed development location, street improvements, tree disposition and landscape plan, noise wall location, plan and elevation views are shown in Figures 2 through 10. While the height of the public elevators is shown at 18 feet 6 inches on Figures 9 and 10, in an email dated July 2, 2015, the applicant has agreed to meet the 16-foot height limit for these structures. 6 LSA Associates, Inc., 2013. Apple Campus 2 Project Public Review Draft Environmental Impact Report. June. Si t e A fe e t 10 0 50 0 no t t o s c a l e no t t o s c a l e FIGURE 1 SO U R C E : A P P L E , J U N E 2 0 1 3 . I: \ C O C 1 3 0 1 A p p l e C a m p u s 2 \f i g u r e s \ A d d e n d u m 4 \ F i g _ 1 . a i ( 6 / 3 0 / 1 5 ) Ap p l e C a m p u s 2 P r o j e c t E I R F o u r t h A d d e n d u m Previously Approved Site A North not to scale FIGURE 2 SOURCE: APPLE, JUNE 2015. I:\COC1301 Apple Campus 2\figures\Addendum 4\Fig_2.ai (6/30/15) Apple Campus 2 Project EIR Fourth Addendum Proposed Phase 1 - Site A Visitor Center and Parking Phase 1 800 Si t e A no t t o s c a l e nt s nt s nt s nt s FIGURE 3a SO U R C E : A P P L E , J U N E 2 0 1 5 . I: \ C O C 1 3 0 1 A p p l e C a m p u s 2 \f i g u r e s \ A d d e n d u m 4 \ F i g _ 3 a . a i ( 6 / 3 0 / 1 5 ) Ap p l e C a m p u s 2 P r o j e c t E I R F o u r t h A d d e n d u m St r e e t I m p r o v e m e n t s K e y M a p - S i t e A Si t e A no t t o s c a l e nt s nt s nt s nt s FIGURE 3b SO U R C E : A P P L E , J U N E 2 0 1 5 . I: \ C O C 1 3 0 1 A p p l e C a m p u s 2 \f i g u r e s \ A d d e n d u m 4 \ F i g _ 3 b . a i ( 6 / 3 0 / 1 5 ) Ap p l e C a m p u s 2 P r o j e c t E I R F o u r t h A d d e n d u m St r e e t I m p r o v e m e n t s K e y M a p - S i t e A no t t o s c a l e FIGURE 4 SO U R C E : A P P L E , J U N E 2 0 1 5 . I: \ C O C 1 3 0 1 A p p l e C a m p u s 2 \f i g u r e s \ A d d e n d u m 4 \ F i g _ 4 . a i ( 6 / 3 0 / 1 5 ) Ap p l e C a m p u s 2 P r o j e c t E I R F o u r t h A d d e n d u m Pr o p o s e d T r e e D i s p o s i t i o n P l a n - S i t e A EV CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP C P C P CP CP C P EV E V EV E V E V EV E V E V CP CP C P CP EV EV CP EV E V E V E V E V CP C P C P EV E V EV EV EV EV EV EV EV EV EV EV CP CP CP CP C P EV E V E V E V E V EV EV EV CP EV NLEGEND no t t o s c a l e FIGURE 5 SO U R C E : A P P L E , J U N E 2 0 1 5 . I: \ C O C 1 3 0 1 A p p l e C a m p u s 2 \f i g u r e s \ A d d e n d u m 4 \ F i g _ 5 . a i ( 6 / 3 0 / 1 5 ) Ap p l e C a m p u s 2 P r o j e c t E I R F o u r t h A d d e n d u m Landscape Plan - Site A VI S I T O R CE N T E R N T A NT A U A V E PRUNERIDGE AVE Re s i d e n t i a l W a l l Si t e S o u n d w a l l LEGEND Re s i d e n Ɵal S o u n d w a l l Si t e S o u n d w a l l no t t o s c a l e FIGURE 6 SO U R C E : A P P L E , J U N E 2 0 1 5 . I: \ C O C 1 3 0 1 A p p l e C a m p u s 2 \f i g u r e s \ A d d e n d u m 4 \ F i g _ 6 . a i ( 6 / 3 0 / 1 5 ) Ap p l e C a m p u s 2 P r o j e c t E I R F o u r t h A d d e n d u m P r o p o s e d S o u n d W a l l - S i t e A no t t o s c a l e FIGURE 7 SO U R C E : A P P L E , J U N E 2 0 1 5 . I: \ C O C 1 3 0 1 A p p l e C a m p u s 2 \f i g u r e s \ A d d e n d u m 4 \ F i g _ 7 . a i ( 6 / 3 0 / 1 5 ) Ap p l e C a m p u s 2 P r o j e c t E I R F o u r t h A d d e n d u m Plan View, Level 1 - Site A no t t o s c a l e FIGURE 8 SO U R C E : A P P L E , J U N E 2 0 1 5 . I: \ C O C 1 3 0 1 A p p l e C a m p u s 2 \f i g u r e s \ A d d e n d u m 4 \ F i g _ 8 . a i ( 6 / 3 0 / 1 5 ) Ap p l e C a m p u s 2 P r o j e c t E I R F o u r t h A d d e n d u m Pl a n V i e w , R o o f L e v e l - S i t e A no t t o s c a l e FIGURE 9 SO U R C E : A P P L E , J U N E 2 0 1 5 . I: \ C O C 1 3 0 1 A p p l e C a m p u s 2 \f i g u r e s \ A d d e n d u m 4 \ F i g _ 9 . a i ( 6 / 3 0 / 1 5 ) Ap p l e C a m p u s 2 P r o j e c t E I R F o u r t h A d d e n d u m Elevations - Site A Sa l e s A r e a Sa l e s A r e a no t t o s c a l e FIGURE 10 SO U R C E : A P P L E , J U N E 2 0 1 5 . I: \ C O C 1 3 0 1 A p p l e C a m p u s 2 \f i g u r e s \ A d d e n d u m 4 \ F i g _ 1 0 . a i ( 6 / 3 0 / 1 5 ) Ap p l e C a m p u s 2 P r o j e c t E I R F o u r t h A d d e n d u m Cr o s s - S e c t i o n V i s i t o r C e n t e r - S i t e A 7/2/15 (P:\COC1301 Apple MM\Products\Fourth Addendum\7-01-15 Fourth Addendum Site A.docx) 15 LSA ASSOCIATES, INC. The visitor center/store building would replace the existing buildings and surface parking lots on the site which include a 25,850-square-foot office building at 10700 North Tantau Avenue, and a 21,580- square-foot office building at 10670 North Tantau Avenue. Development on Site A would include 129 surface parking spaces, and 684 below-grade parking spaces for visitors and employees. A total of 75 valet parking stalls are included on the second and third below-grade parking levels, and these stalls are not included in the count of parking spaces. The maximum building height of the visitor center would be 35 feet to the top of the elevator and stair penthouse and the roof of the terrace, as shown on Figure 9. The maximum building height of the basement parking elevator would be 16 feet as discussed previously. 3. Evaluation of Minor Modifications to Site A Development As shown in Table 1, for Site A, the Final EIR approved a total of 155,000 square feet of valet/reception parking space and 750 parking spaces. The modified proposed use for Site A would consist of a 12,500 visitor center with 261,000 square feet of below ground level parking and ancillary uses (e.g., drive aisles, elevators), and 800 parking spaces. While the total amount of building square footage and excavation of materials to house parking would be increased, a benefit of the modification would be development of the site with an attractive visitor center, an Apple store and landscaping rather than two large parking structures. The proposed total area of Site A remains unchanged from the previously approved 3.559 acres; however, the amount of hardscape would slightly increase from 2.06 acres to 2.28 acres due to the placement of more parking underground. The amount of excavation on Site A would be 135,000 cubic yards, and the amount of off-haul would be 30,000 cubic yards. Based on a review of the total excavation currently proposed for the entire site,7 the total amount of excavation would remain at 280,000 cubic yards and the total amount of off-haul would remain at 150,000 the amounts allowed under the Final EIR (see page 136 of the Draft EIR). 7 Dalia, Manish, P.E., Luk and Associates. 2015. Letter to Piu Ghosh City of Cupertino, Subject: Site A Visitor Center and Parking Structure Planned Development Permit Application – Earthwork Quantities. June 26. Table 1: Summary of Proposed Changes to Site A Development Site Information Approved Development Proposed Development Total Site Area (acres) 3.56 3.56 Hardscape 2.06 2.28 Softscape 1.38 1.27 Employees NAa 10 Parking Surface Stalls 197 116 Below-Grade Stalls 348 684 Stall in Parking Structure 205 0 Total Parking Stalls 750 800 Valet Parking Stalls 60 75 Excavation (cubic yards) NA 135,000 Off-Haul (cubic yards) NA 30,000 Building Information (sq/ft) Approved Development Proposed Development Total Occupied Building Area 30,000 12,500 Valet Reception 30,000 0 Visitor Center 0 12,500 Total Unoccupied Area 130,000 261,000 Parking Below-Grade NA 261,000 Parking Structure 66,415 0 Total Development Area 925,000 983,000 a The number of employees for Site A is included in the total number proposed to be working east of Tantau Avenue. Source: Foster and Partners, 2014. 7/2/15 (P:\COC1301 Apple MM\Products\Fourth Addendum\7-01-15 Fourth Addendum Site A.docx) 16 LSA ASSOCIATES, INC. There are no changes to the trees proposed to remain or to be removed on Site A since certification of the Final EIR,8 on October 15, 2013. 4. Summary of Potential Impacts The following provides a short discussion of the potential environmental impacts associated with the proposed minor modifications to Site A development. a. Aesthetics. The design modifications to Site A would not result in environmental impacts beyond those already identified in the Final EIR. The Final EIR evaluated the impacts of a valet reception and parking structure and a parking garage with two levels above ground (up to 35 feet tall) on Site A. The proposed project modifications would result in the development of one, smaller building of the same height. The Final EIR evaluated the impacts of two parking structures on Site A, and the design modifications would result in a reduced development footprint for one well-designed and landscaped 12,500 square-foot building that is open to the public. The design modifications would not result in new or more significant impacts to scenic views, views from North Tantau Avenue or views from adjacent residential properties due to the existing screening provided by existing trees and the proposed berm and sound wall along the eastern boundary of the site (see Figure 6). So that viewers from the proposed rooftop terrace cannot view neighboring homes to the east, a screen will be placed along the eastern edge of the terrace to direct views to the northwest toward the main Apple building. b. Transportation and Circulation. The design modifications to Site A would not result in environmental impacts associated with circulation and trips beyond those already identified in the Final EIR. Starting on page 432, the Draft EIR evaluated the provision of parking for vehicles and bicycles and determined that overall, 10,980 parking spaces would be provided by the project, with 9,180 parking spaces provided in Phase 1, plus an additional 60 valet parking spaces provided at the Tantau Parking Structure. The total amount of parking proposed for Site A (800 spaces and 75 valet spaces) is included within the amount of parking evaluated in the EIR as part of Phase 1. Therefore, the design modification does not decrease the number of visitor and special event parking spaces to be provided on Site A such that it would cause a shortage of parking, or overflows into the neighborhood. Bicycle parking would also be provided at the visitor center. Starting on page 440, the Draft EIR evaluated construction impacts including construction trips and determined that impacts associated with short-term construction traffic, including trips associated with any increase in the amount of material that would need to be hauled off-site would be less than significant because, “Overall, the simulation analysis shows that the existing roadway network has adequate capacity at the Wolfe Road/Pruneridge Avenue and Tantau Avenue/Pruneridge Avenue intersections to serve the projected truck traffic during the construction phase of the project. c. Air Quality and Greenhouse Gas Emissions. The operation of the proposed project would not create any new or more significant impacts due to the design modifications, as discussed below. Site A was proposed to be used for visitor and employee parking and it would continue to do so. The proposed visitor center has been designed to achieve a minimum LEED Silver, as indicated in the 8 LSA Associates, Inc., 2013. Apple Campus 2 Project Final EIR (State Clearinghouse No. 2011082055). October. 7/2/15 (P:\COC1301 Apple MM\Products\Fourth Addendum\7-01-15 Fourth Addendum Site A.docx) 17 LSA ASSOCIATES, INC. Application on page number P-VC-1.50 and required in the Final EIR. The design modifications do not propose additional employees, therefore no new users of electricity and water. As noted previously, the amount of materials to be off-hauled from Site A plus an assumed 5,000 cubic yards of topsoil to be in-hauled was included within the total amount of hauling trips evaluated for potential air quality emissions and impacts and allowed under the Final EIR. Page 303 of the Draft EIR notes the following: The project would require approximately 1,690,000 cubic yards of excavation (net) and 1,620,000 cubic yards of fill (net) for Phase 1 and Phase 2 combined. Phase 1 would result in a balanced site and Phase 2 would require approximately 150,000 cubic yards of soil to be exported from the site. Phase 1 would require approximately 45,000 cubic yards of top soil import and Phase 2 would require an import of 5,000 cubic yards, for a total top soil import of 50,000 cubic yards. Air pollutant emissions associated with construction of the project was determined to be significant and unavoidable (Impact AIR-1) although Mitigation Measure AIR-1 on pages 546 to 548 of the Draft EIR would minimize construction emissions to the extent possible. The applicant must continue to follow the requirements of the Construction Management Plan and Mitigation Measure AIR-1, and continuing implementation of these measures would ensure that GHG and air quality impacts associated with the amount of material to be off-hauled or in-hauled are not substantially more severe than those is already identified and mitigated in the Final EIR. d. Noise. The design modifications to Site A would not result in environmental impacts beyond those already identified in the Final EIR as a noise wall was required along the eastern boundary of the site and the modified plan includes the sound wall. The design modifications do not propose new land uses that would create new stationary or operational noise impacts and construction and operational noise levels would continue to be acceptable due to the provision of adequate separation distance between the residential neighborhoods and Site A uses. The proposed surface parking area would not result in a significant impact to sensitive receptors because the closest receptors are approximately 50 feet away and separated from the parking lot by a berm and 8-foot noise wall. Additionally, the remainder of the parking spaces would be below ground. B. COMPARISON TO THE CONDITIONS LISTED IN CEQA GUIDELINES SECTIONS 15162 AND 15163 The following discussion summarizes the reasons that a Subsequent EIR, pursuant to CEQA Guidelines Sections 15162 and 15163, is not required to evaluate the environmental effects of the currently-proposed project. 1. Substantial Changes to the Project For the reasons stated above, the proposed minor modifications to the project would not result in new significant environmental impacts beyond those identified in the Final EIR, would not substantially increase the severity of impacts identified in the Final EIR, and thus would not require major revisions to the Final EIR. Therefore, the proposed changes to the project would be minor refinements, not 7/2/15 (P:\COC1301 Apple MM\Products\Fourth Addendum\7-01-15 Fourth Addendum Site A.docx) 18 LSA ASSOCIATES, INC. substantial changes, and an Addendum is the appropriate document to address these minor modifica- tions rather than a Subsequent EIR or a Supplement to the Final EIR. 2. Substantial Changes in Circumstances Construction of the project is underway. Environmental conditions in and around the project site have not changed such that implementation of the proposed minor modifications to the project would result in new significant environmental effects or a substantial increase in the severity of environmental effects identified in the Final EIR, and thus would not require major revisions to the Final EIR. 3. New Information No new information of substantial importance, which was not known and could not have been known when the Final EIR was certified, has been identified which shows that the proposed minor modifica- tions to the project would be expected to result in: 1) new significant environmental effects not identified in the Final EIR; 2) substantially more severe environmental effects than shown in the Final EIR; 3) mitigation measures or alternatives previously determined to be infeasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project sponsor declines to adopt the mitigation measure or alternative; or 4) mitigation measures or alterna- tives which are considerably different from those identified in the Final EIR would substantially reduce one or more significant effects of the project but the project sponsor declines to adopt the mitigation measure or alternative. In addition, as stated above in Parts B.1 and B.2, the proposed minor modifications to the project would require no new mitigation measures because no new or substantially more severe impacts are expected beyond those identified in the Final EIR. Existing regulations (including City of Cupertino General Plan policies and Zoning Ordinance regulations) and mitigation measures adopted and made conditions of project approval would continue to apply. C. CONCLUSION The proposed minor modifications to the Apple Campus 2 Project Site A development described in this Fourth Addendum, would not require major revisions to the Final EIR due to new or substantially increased significant environmental effects. There have been no substantial changes with respect to the circumstances under which these minor modifications would be undertaken that would require major revisions of the Final EIR due to new or substantially increased significant environmental effects, and there has been no discovery of new information of substantial importance that would trigger or require major revisions to the Final EIR due to new or substantially increased significant environmental effects. Therefore, no subsequent or supplemental EIR is required prior to approval of the minor modifications to the Site A development of the Apple Campus 2 Project, as described in this Fourth Addendum. Apple Campus 2 - Phase 1 North Tantau Ave - Site A Site & Architectural Review April 2015 Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking 02 2193 02/25/2015 P-VC-1.10 List of Drawings/ Project Overview Not To Scale PROJECT DIRECTORY PROJECT OVERVIEW PROJECT OBJECTIVES EMAIL: swilliams@theolinstudio.com CONTACT: SARAH WILLIAMS PHONE: 215 440 0030 PHILADELPHIA, PA 19106 150 SOUTH INDEPENDENCE MALL WEST OLIN LANDSCAPE ARCHITECT dwhisenhunt@apple.comEMAIL: DAN WHISENHUNTCONTACT: 408 996 1010PHONE: CUPERTINO, CA 95014 MS 47-2 REF 1 INFINITE LOOP APPLE, INC. OWNER ● PERMITS AND APPROVALS ASSOCIATED WITH THIS APPLICATION ● ● manish@lukassociates.comEMAIL: MANISH DALIACONTACT: 510 724 3388PHONE: Hercules, CA 94547 738 Hercules Nobre Drive LUK & ASSOCIATES CIVIL ENGINEER LIST OF DRAWINGS Minor Modifications to the October 2013 Development Permit Architectural and Site Approval Apple is seeking from the City of Cupertino the approvals listed below: CUPERTINO, CA 95014 19050 PRUNERIDGE AVENUE, EMAIL: psokolof@fosterandpartners.com PETER SOKOLOFF CONTACT: 408 610 5800PHONE: FOSTER + PARTNERS ARCHITECT TitleNumber DrawingDrawing ● ● ● ● ● ● ● ● ● ● garage with an additional 710 stalls in 260,000 sf. parking, with approximately 130 stalls toward the East, forms part of this landscape above a three-storey basement which will serve as a meeting place for visitors and provides a serene environment for cafe outdoor seating. The on-grade campus landscaping along tree-lined Tantau Avenue. A landscaped plaza is planned around the Visitor Center building as an interface with the public. The building is set in a unified and publicly accessible landscape, commensurate with the The project replaces the current disjointed set of aging corporate buildings with a refined 12,500 sf. building that serves be accessible to the public, offering views of the AC2 Main Building and surrounding landscape. program for visitor reception, cafe and a retail area for sale of Apple products. Additionally, a rooftop observation deck will basement parking serving Site A, the Phase 1 Main Building and Theater. The Visitor Center building will comprise ease of use and beauty. The 3.6-acre site will be re-developed with a Visitor Center and associated on-grade and the City of Santa Clara. The new development is to provide an environment reflecting Apple’s brand values of innovation, East of North Tantau Avenue, North of Pruneridge Avenue and West of the boundary between the City of Cupertino and Apple proposes to develop Site A of the Tantau Development, part of Phase 1 of Apple Campus 2. The site is located The project’s specific objectives are to: publicly accessible Visitor Center and additional parking. The main objective of this project is to provide essential additional components to the Apple Campus 2 project, namely a Site A, part of Phase 1 of Apple Campus 2, will result in replacement and rebuilding of the approximately 3.6-acre site. ● prioritizing transit and active commute modes planning and regional connectivity coupled with a robust transportation program Actively support and encourage sustainable commuting culture with thoughtful site design and development Exceed economic, social, and environmental sustainability goals through integrated improve run-off by increasing permeable surfaces Minimize use of potable water through using recycled water wherever possible, and established with renewable energy providers for grid-purchased renewable energy energy efficient building, aligned with the AC2 environmental strategy and partnerships Contribute to achieving a net zero energy strategy for Apple Campus 2 by constructing an for Apple employees and for scheduled special media events held at the Apple Campus 2 Theater, as well as Provide essential parking capacity for Apple Campus 2, for visitors on a day-to-day basis climate and history of the area Maximize the provision of green space, and design this space in accordance with the Avenue harmony with the overall Apple Campus 2 landscaping, in particular along North Tantau Create a publicly accessible, relaxed landscape setting for the Visitor Center which is in newest Apple products. Create a retail component on the site which allows visitors to view and purchase the observation deck Give visitors of Apple Campus 2 the opportunity to see the Main Building from the rooftop spontaneous visitors Create an easily approachable and intuitive interface with the public including forefront of its industry technologies and materials available today, aligned with Apple’s impetus to stay at the Create a distinctly innovative building, achieved with the most advanced building practices, and allows for a long-term presence in Cupertino Create a public face of Apple Campus 2 that reflects Apple’s business and design P-VC-6.01 Perspective View - Visitors Center from North P-VC-6.00 Perspective View - Visitors Center from South Architecture - Visualization P-VC-5.70 Visitors Center & Parking - Enlarged Elevations P-VC-5.60 Visitors Center & Parking - Enlarged Sections P-VC-5.55 Visitors Center & Parking - Enlarged Plan View - Penthouse Roof P-VC-5.54 Visitors Center & Parking - Enlarged Plan View - Roof Level P-VC-5.53 Visitors Center & Parking - Enlarged Plan View - Level 01 P-VC-5.31 Visitors Center & Parking - Rendered Elevation & External Materials P-VC-5.30 Visitors Center & Parking - Rendered Elevation & External Materials P-VC-5.20 Visitors Center & Parking - Elevations P-VC-5.10 Visitors Center & Parking - Sections P-VC-5.04 Visitors Center & Parking - Plan View - Roof Level P-VC-5.03 Visitors Center & Parking - Plan View - Level 01 P-VC-5.02 Visitors Center & Parking - Plan View - Level B1 P-VC-5.01 Visitors Center & Parking - Plan View - Level B2 P-VC-5.00 Visitors Center & Parking - Plan View - Level B3 Architecture - Visitors Center & Parking P-VC-4.70 Site Walls P-VC-4.60 Site Furnishings P-VC-4.50 Site Lighting P-VC-4.41 Landscape Materials P-VC-4.40 Materials Plan P-VC-4.33 Planting Palette P-VC-4.32 Planting Schedule P-VC-4.31 Planting Plan - Herbaceous P-VC-4.30 Planting Plan - Trees P-VC-4.20 Landscape Plan P-VC-4.16 Apple Campus 2 Overall Project Tree Disposition Plan - South P-VC-4.15 Apple Campus 2 Overall Project Tree Disposition Plan - North P-VC-4.10 Proposed Tree Disposition Plan P-VC-4.09 Tree Disposition Plan Per EIR Entitlements October 2013 P-VC-4.00 Existing Tree Plan Site - Landscape P-VC-3.50 Proposed Utilities P-VC-3.40 Existing Utilities P-VC-3.31 Storm Water Quality BMP Typical Details P-VC-3.30 Storm Water Control Plan P-VC-3.21 Street Improvements P-VC-3.20 Street Improvements P-VC-3.10 Proposed Topography P-VC-3.00 Existing Topography Site - Civil P-VC-2.40 Perspective View - Tantau Avenue Looking South P-VC-2.21 Site Plan - Site A - Fire / Accessibility Plan P-VC-2.20 Site Plan - Site A - Proposed Site - Masterplan P-VC-1.50 LEED Summary P-VC-1.40 Existing Site Plan P-VC-1.30 Proposed Conceptual Site Plan P-VC-1.20 Project Data / Project Location P-VC-1.10 List of Drawings / Project Overview P-VC-1.00 Cover Sheet General Overview 00 JLPlanning - Site & Architectural Review02/25/2015 01 04/20/2015 Planning - Site & Arch. Review Resubmit JL 02 06/10/2015 Planning - Site & Arch. Review Resubmit 2 JL 03 07/01/2015 Planning - Site & Arch. Review Resubmit 3 NM N Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking Overrun Elevator N FFL +29' 9" Accurate 60k Roll-OffTSEXT - Refuse Collection Site Property Line INTE RC EPTOR GREASE GENERATOR EMERGENCY PG & E 15' Street Side Setback Site Property Line 50' Cree k Setback Site Property Line Site Property Line 15' Front Setback Site Property Line 50' Creek Setback Site Property Line 15 ' Front Setback Site Property Line 50' Creek Setback Site Property Line 15' Front Setback Public Utili t y Easement Site Property Line 15' Street Side Setback 20' CAL Water Easement Site Property Line 25 ' Rea r Setbac k 10 0 ' Rea r Setbac k From Residential 10 0 ' Rear Setback From Residential Site Prop erty Line Public Utility Easement Site Property Line 15' Front Setback Site Property Line 25' Rear Setback Site Property Line 15 ' Stree t Side Setback Public Utility Easement Site Property Line 25' Interior Side Setback 15' Front Setback Site Property Line Site Property Line 15' Front Setback Site Property Line 25' Interior Side Setback 150 ' Interior Side Setback From Residential (Buildings Taller Than 16') Site Property Line 50' Creek Setback Pub lic Utility Easement Site Property Line Site Property Line 15' Street Side Setback 15' Street Side Setback Pub lic Utilit y Easement Site Property Line 150' Interior Side Setback From Residential (Building s Taller Than 16') 50'x8' TriangularObstruction Free Zone (3' Max. Ht.) 50'x8' Triangular Obstruction Free Zone (3' Max. Ht.) 50'x8' Triangular Obstruction Free Zone (3' Max. Ht.) 50'x8' Triangular Obstruction Free Zone (3' Max. Ht.) 10' Setback of surface improve ments for ne w tree planting ON L Y ON L Y ONLY ONLY ONLY ONLY ONLY ONLY ONLY ONLY ONLY ONLYONLY ONLY ONLY ONLY ONLY ONLY ON LY ON LY ON LY ON LY ONLY ON LY ON LY ONL Y ON LY ONLY ONLY E Homestead Rd 3535 BIKELANE BIKELANE BIKELANE BIKELANE 3535 3535 STOP 25 STOP STOP STOP STOP STOPSTOP STOP STOP 25 35 Line of existing trees to remain 10 ' Setbac k of surf ac e improv ements from existing tree line 10 ' Setbac k of surf ac e improv ements for new tree planti ng Compac tors Baler Chillers Storage Logistics Coo ling Towers Generators Emergency Bank Load Switchgea r Meter Gas Transformers ONLY HC HC HC HC HC HCHC +176'-06'' +155'-7 1/2" +141 '-6'' +141'-6'' +155'-7 1/2" +156'-7 1/2" GENERATOR BACKUP DIESEL GENERATOR BACKUP DIESEL (FUTURE) GENERATOR BACKUP DIESEL DIESEL STORAGE TANK ABOVE GROUND DIESEL STORAGE TANK ABOVE GROUND 36'-6" 4'- 1/16 " 6'-0" 4'-9 1/8 " 417'-5 13/16 " 6'-7 5/8 " 9'-2" 50'-2 1/16 " 9'- 9/16 " 50'-2 1/16 " 9'- 9/16 " 50'-2 1/16 " 13'-10 11/16 " 8'-5 15/16 " 14'-3 9/16 " 28'-7" 4'-0" 16'-1" 8'-0" 9 1/16 " APP004.25 APP004.11 APP004.24APP004.23 APP004.22APP004.21 APP004.14 APP004.12 APP004.13 APP004.15 APP004.35 APP004.41 APP004.34 APP004.33 APP004.32 APP004.31 APP004.44 APP004.42 APP004.43 APP004.45 8'-3" 7'-6" 4'-8" 9'-5" 4'-8" 9'-5" 5'-6" 9'-5" 4'-8" 9'-5" 4'-8" 9'-5" 4'-8" 9'-5" 4'-8" 9'-5" 7'-6" 7'-6" 6'-7" 5'-10" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 5' 5' 3' 5'-10" 3' 5'-10" 3' 4' 4' 4' 4' 29'-2" 29'-2" 29'-2" 29'-2" 5' 5' 5' 5' 5' 8' 17'-1" 4'-1"1'-1"8' 4'-8" 29'-2" 29'-2" 29'-2" 29'-2" 4' 4' 4' 4' 4' 5' 5' 5'-10" 6'-7" 3' 3'-10" 6'-7" 6'-3" 6'-3" 6'-3" 6'-3" 6'-7" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 0" 6'-3" 6'-3" 6'-3" 5'-10" 3' 5'-10" 5' 4'-3" 4'-3" 8' 8'-6" 8' 4'-3" 4'-3" 10' 9'-6" 8'-6" 8' 8'-6" 8' 4'-3" 4'-3" 5' 9' 4'-8" 4'-9" 9' 5' 4'-3" 4'-3" 8' 8'-6" 8' 8'-6" 9'-6" 8' 8'-6" 8' 8'-6" 8' 4'-3" 4'-3" 4'-11" 9'-5" 4'-8" 9'-5" 4'-8" 8'-2" 3' 4'-1" 10'-5" 10'-5" 4'-5" 4'-3" 6'-7" 7' 2'-2" 3'-1" 4' 3'3' 4' 29'-2" 4' 4' 4' 4' 4' 4' 8' 17'-1" 4'-1" 1'-1" 8'4'-8" 4' 4' 4' 4' 4' 29'-2" 4'-1" 3' 8' 8' 6'-3" 6'-3" 3' 7' 2'-2" 4' 4'1' 3'-1" 3' LIMB UP LIMB UP COO LING TOWER YARD 8,315 sq-ft UTC FUEL CELL YARD 11,750 sq-ft COO LING TOWER YARD 8,315 sq-ft W o l f e R o a d Homestead Road Stevens Creek Blvd. Interstate-280 N . T a n t a u A v e N . T a n t a u A v e 02 2193 Not To Scale Site Information Building Information BUILDING HEIGHTS NORTH VALLCO P(MP) INDUSTRIAL / OFFICE NORTH VALLCO P(MP) INDUSTRIAL/OFFICE GENERAL PLAN PLANNING AREA ZONING DESIGNATION GENERAL PLAN DESIGNATION TOTAL SOFTSCAPE AREA TOTAL HARDSCAPE AREA SITE COVERAGE SITE NET AREA SITE AREA 116 348 684 197 205 OCCUPIED BUILDING AREA n/a OFF-HAUL EXCAVATION Project Location Project Data Table TOTAL GROSS AREA OTHER P-VC-1.20 02/25/2015 750 20,000 sq ft 22,500 sq ft 12,500 sq ft Project Data Table - Site A PROJECT DATA TABLE GROSS SITE AREAS 7,684,000 sq ft (176.3 acres) TOTAL AREA = 290,000 sq ft (6.8 acres) 7. North Tantau Avenue Site D 399,000 sq ft (9.1 acres) 6. North Tantau Avenue Site C 198,000 sq ft (4.5 acres) 5. North Tantau Avenue Site B 155,000 sq ft (3.6 acres) 4. North Tantau Avenue Site A 207,000 sq ft (4.75 acres) 3. Partial Vacation of Pruneridge Avenue 2,155,000 sq ft (49.3 acres) 2. Ridgeview Court 4,280,000 sq ft (98.2 acres) 1. Pruneridge Campus 800 n/a n/a Valet Reception + Parking + 161'-0" + 161'-0"n/a STRUCTURE BASEMENT SURFACE PARKING TOTAL PARKING SPACES + 157'-0" 66,415 sq ft 15'- 0" n/a 35'- 0" (2 STORIES) 7am - 7pm NUMBER OF EMPLOYEES SITE A NUMBER OF EMPLOYEES (PHASE 2) NUMBER OF EMPLOYEES (EAST OF TANTAU) HOURS OF OPERATION PROPOSED USES n/a 1,000 1,200 n/a n/a for sites East of Tantau and Phase 2. * Employees for Site A are included in overall counts 3.559 acres1.388 acres2.060 54% acres3.452 acres n/a -- -- October 2013 Development Permit October 2013 Development Permit June 2015 Architecture / Site Review June 2015 Architecture / Site Review 10 * 135,000 CY 30,000 CY ** 9am - 7pm Weekends 7am - 7pm M-F 800 Parking Stalls 10 Employees Site A 3.559 acres 1.27 acres 2.28 14% acres3.452 acres n/a 7,700 sq ft 253,300 sq ft PARKING STRUCTURE BASEMENT BACK OF HOUSE PARKING BASEMENT n/a 23'-0" ROOF LEVEL 35'-0" T.O. PENTHOUSE ROOF n/a Visitor Center + Parking / Sales PARKING STRUCTURE VISITOR CENTER / STORE VALET / RECEPTION GRADE LEVELS (PODIUM) PARKING STRUCTURE VISITOR CENTER / STORE VALET / RECEPTION ** for total off-haul quantities Permit Refer to October 2013 AC2 Planned Development 2,500 sq ft * * * DIR-2014-11 *** Including area reduction based on minor modification 0****OFFICE AMENITY SPACE 12,500 sq ft **** 2,500 sq ft ofice space will remain available for Phase 1. 01 P-VC-2.20 00 JLPlanning - Site & Architectural Review02/25/2015 01 04/20/2015 Planning - Site & Arch. Review Resubmit JL 02 06/10/2015 Planning - Site & Arch. Review Resubmit 2 JL 03 07/01/2015 Planning - Site & Arch. Review Resubmit 3 NM PLOT 1 PLOT 3 PLOT 4 PLOT 5 PLOT 6 PLOT 2 E Homestead Road PLOT 1 PLOT 3 PLOT 4 PLOT 5 PLOT 6 PLOT 2 N W o lfe R o a d Interstate 280 PLOT 7 Pruneridge Ave. N . T a n t a u A v e . 01 Project Location Not To Scale N Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking 01 2193 02/25/2015 P-VC-1.30 Not To Scale Proposed Conceptual Site Plan Proposed Conceptual Site Plan 00 JLPlanning - Site & Architectural Review02/25/2015 01 04/20/2015 Planning - Site & Arch. Review Resubmit JL N 01 N Not To Scale Homestead Road W o l f e R o a d Interstate-28 0 N . T a n t a u A v e . N . T a n t a u A v e . Pruneridge Ave. Calabazas Creek W o l f e R o a d (5 Stories) Parking Structure AC2 Phase 2 (4 Stories) Office Building AC2 Phase 2 (4 Stories) Main Building AC2 Phase 1 (2 Stories) Fitness Center AC2 Phase 1 (2 Stories) Parking Structure AC2 Phase 1 (2 Stories) Site B AC2 Phase 2 (2 Stories) Testing Facility South AC2 Phase 2 (2 Stories) Testing Facility North AC2 Phase 2 (1 Story) Theater AC2 Phase 1 (2 Stories) Visitors Center & Parking AC2 Phase 1 Existing Site Plan 01 Site Plan - Existing P-VC-1.401"=30' (1:360) 1"=30' (1:360) STOP STOP STOP STOP STOP SLOW BUMP 35 35 STOP AC P AV EMEN T A C P A V E ME NT CONCRETE WALK CON C R ET E WA LK G R AS S G R AS S GR A S S GR A S S A C P A V E ME NT AC P A V EMEN T A C P A V E ME NT AC P A V EMEN T A C P AV E ME N T AC P A V EMENT AC P A V EMEN T CONCRETE CONCRETE C O N C R E T E C O N C R ET E CON C R ET E CON CR ETE CONCR ETE CON CRETE CON C R ET E GA TE GR AS S GR A S S TE NT GR A S S GR A S S GR A S S GR A S S GRAS S A C P AV EME N T AC P A V EMEN T S IGN S IGN S IGN P E D S IGN H o s e B ib BUILDING 4 6 T TE N T TE N T C O N C R E T E C O N C R ET E C O N CR E T E LAN D S C A P E LA N D S C AP E C ON C R E T E LA N D S C A P E LA N D S C AP E LA N D S CA P E LAN D S C A P E GR AV E L GR A V EL DIR T C ON C R E T E LA N D S C A P E LA N D S CAP E LAN D S C A P E LAN D S C A P E LA N D S C AP E LA N D S C A P E LAN D S C A P E LA N D S C AP E LAN D S C A P E LA N D S C AP E C O N CR E TE S IGN CON C R ET E GR AS S G R A S S LA N D S C AP E C O N C R ET E C ON CR E T E LA N D S C AP E LAN D S C A P E LA N D S C AP E LAN D S C A P E LA N D S C AP E LAN D S C A P E LA N D S C AP E GR A S S LA N D S C A P E A C P A V E M E N T A C P AV E ME N T GR AS S GR A S S C ON CR E T E A S P H A LT A S P HA LT A S P H A LT A S P H A LT C O N C . C O N C . C O N C . A S P HA LT AS P H A LT GR A S S CON C R ET E AS P H A LT GR A S S S IGN S IGN S IGN North Tantau Avenue N ort h T ant au A venu e P r u n e r id g e A v e n u e xx,xxx square feet 10600 N. Tantau Ave Tantau 4 21,580 square feet 10670 N. Tantau Ave Tantau 5 25,850 square feet 10700 N. Tantau Ave Tantau 6 Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive 00 02/25/2015 00 02/25/2015 Planning - Site & Architectural Review MD 2193 Apple, Inc. Key Plan © Foster Partners 2014www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Notes Topographic survey information on these plans has been obtained November 15th, 2012 from Kier & Wright surveyors, dated November 15,2012, and subsequent field survey. Property Line information on these plans has been obtained from Kier & Wright surveyors, dated December, 2014 - Parcel Map. 1. 2. North Tantau Avenue Site A Visitors Center & Parking N N Apple Campus 2, Phase 1 Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking 01 2193 02/25/2015 P-VC-1.50 LEED Summary Not To Scale LEED Summary 00 JLPlanning - Site & Architectural Review02/25/2015 01 04/20/2015 Planning - Site & Arch. Review Resubmit JL N 01 Not To Scale S I T E - M a s t e r p l a n Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking N O N L Y ONLY ONLYONLY ONLY O N L Y ONLY DI- R IM 15 1 . 3 5 INV 1 4 8 . 1 5 12 " ( I N- E) INV 1 4 8 . 1 0 12 " ( O U T- W) 11 .1" 3 4 3 7 16 " 96 2 4 " 9 3 14 " 8 7 02 2193 02/25/2015 1" = 30' (1:360) P-VC-2.20 Site Plan Site A - Proposed Site Plan - Proposed 01 P-VC-5.03 00 JLPlanning - Site & Architectural Review02/25/2015 01 04/20/2015 Planning - Site & Arch. Review Resubmit JL 02 06/10/2015 Planning - Site & Arch. Review Resubmit 2 JL 03 07/01/2015 Planning - Site & Arch. Review Resubmit 3 NM 7' 6" 15 ' 0" 25' 0" 1 5 0 ' 0 " Employee / Visitor Parking10 Stalls 10 Stalls (Tantau Ave) Reception Center AC2 Visitor 1 5 ' 0 " Outline of Exterior Glazing Basement Ramp Taxi/Employee Drop-off (Tantau Ave) AC2 Transit Center Site B AC2 Phase 2 2 5 ' 0 " Along East Property Line Residential Sound Wall Air Intake Grille, Typ L and s c ap ed M ed ian Pedestrian Walkway P R U N E R ID G E A V E . MEADOW AVE. M E L O D Y L N . S H A S T A D R . N. TANTAU AVE. N. TANTAU AVE. 7 '- 6 " Public Plaza Egress Stair Public Plaza Land scaped M ed ian Pedestrian Walkway Public Utility Easement Site Boundary Employee/Visitor Parking Site Boundary Mechanical Exhaust Structure Mechanical Exhaust Structure Public Elevators Site Boundary Mechanical Exhaust Structure Mechanical Exhaust Structure (N. Tantau Ave.) Visitor Parking Entrance (Pruneridge Ave.) Visitor Parking Entrance 29'-8" 39'-8" 5 1 ' 9 " 6 1 ' 9 " 15' 0" 2 5 ' 0 " Egress Stair / Elevator 10 Stalls Garage Below Grade Outline of Parking Garage Below Grade Outline of Parking 6 0 ' 0 " R e a r S e t b a c k 10 Stalls 10 Stalls 10 Stalls 3 Stalls 3 Stalls Transformer Visitor Drop-off Area Public Plaza Public Plaza Street Side Setback S tree t S id e S e tb ac k (Buildings Taller Than 16') 150' Setback from Residential 240' 0" 210' 0" 9 0 ' 0 " F r o n t S e t b a c k Interior Side Setback 10 Stalls10 Stalls8 Stalls 10 Stalls10 Stalls 2 Stalls 2 Stalls5 Stalls 5'-0" 8 Stalls FFL +157'-0" (2 Story) Visitors Center / Store 23'-9" 27 '-4" Landscape Setback Property Line Site Boundary Right Turn Only Sign Only Sign Right Turn Fence Line (8 Surplus) Parking Stalls = 796. 788 Required Parking Stalls. Adjusted Total Future Ingress/Egress. Loss of 4 Dashed Area Indicates Potential Fence Line 01 1"=30' (1:360) N P-VC-2.30 03 P-VC-2.30 04 P-VC-2.30 01 P-VC-2.30 02 ht.) Zone (3' max. Obstruction Free 8'x50' Triangular ht.) Zone (3' max. Obstruction Free 8'x50' Triangular UP DN UP Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking N P3 P1P2 O N L Y ONLY ONLYONLY ONLY O N L Y ONLY DI- R IM 15 1 . 3 5 INV 1 4 8 . 1 5 12 " ( I N- E) INV 1 4 8 . 1 0 12 " ( O U T- W) 02 2193 02/25/2015 1" = 30' (1:360) P-VC-2.21 Site Plan Site Plan - Fire Access / Accessibility Plan Fire Access / Accessibility Plan 00 JLPlanning - Site & Architectural Review02/25/2015 01 04/20/2015 Planning - Site & Arch. Review Resubmit JL 02 06/10/2015 JLPlanning - Site & Arch. Review Resubmit 2 Planning - Site & Arch. Review Resubmit 3 NM07/01/201503 Tantau Ave Access from Primary Fire Pruneridge Ave Access from Secondary Fire of Travel Accessible Path (No Fire Truck Access) Visitor Parking Building Access around Continuous Plaza (Continuous Access) Accessible Path of Travel Fire Access Legend S H A S T A D R . MEADOW AVE. M E L O D Y L N . P R U N E R ID G E A V E . N. TANTAU AVE. Site B AC2 Phase 2 (Tantau Ave) Reception Center AC2 Visitor (Tantau Ave) AC2 Transit Center Parking Garage over Below-Grade Access not required Note: Fire Truck Parking Garage over Below-Grade Access not required Note: Fire Truck Public Sidewalk Garage Below Grade Outline of Parking Public Sidewalk Egress Stair / Elevator Public Elevators Egress Stair Mechanical Exhaust Structure Mechanical Exhaust Structure Mechanical Exhaust StructureMechanical Exhaust Structure Air Intake Grille, Typ FFL +157'-0" (2 Story) Visitors Center / Store 01 1"=30' (1:360) N Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking 01 2193 02/25/2015 P-VC-2.40 Perspective View Tantau Avenue Looking West Not To Scale Perspective View - Tantau Avenue Looking West 00 JLPlanning - Site & Architectural Review02/25/2015 01 04/20/2015 Planning - Site & Arch. Review Resubmit JL N 01 Not To Scale S I T E - C i v i l 01 P-VC-3.00 Existing Topography Existing Topography Plan 1"=30' (1:360) 1"=30' (1:360) North Tantau Avenue N ort h T ant au A venu e P r u n e r id g e A v e n u e STOP STOP STOP STOP STOP SLOW BUMP 35 35 STOP 160 16 0 1 6 0 155 150 160 155 155 155 155 160 15 5 155 160 160 155 155 1 5 5 1 5 5 1 6 0 16 0 16 0 16 0 160 155 15 5 15 5 155 155 155 150 15 0 AC P AV EMEN T A C P A V E ME NT CONCRETE WALK CON C R ET E WA LK G R AS S G R AS S GR A S S GR A S S A C P A V E ME NT AC P A V EMEN T A C P A V E ME NT AC P A V EMEN T A C P AV E ME N T AC P A V EMENT AC P A V EMEN T CONCRETE CONCRETE C O N C R E T E C O N C R ET E CON C R ET E CON CR ETE CONCR ETE CON CRETE CON C R ET E GA TE GR AS S GR A S S TE NT GR A S S GR A S S GR A S S GR A S S GRAS S A C P AV EME N T AC P A V EMEN T S IGN S IGN S IGN P E D S IGN H o s e B ib BUILDING 4 6 T TE N T TE N T C O N C R E T E C O N C R ET E C O N CR E T E LAN D S C A P E LA N D S C AP E C ON C R E T E LA N D S C A P E LA N D S C AP E LA N D S CA P E LAN D S C A P E GR AV E L GR A V EL DIR T C ON C R E T E LA N D S C A P E LA N D S CAP E LAN D S C A P E LAN D S C A P E LA N D S C AP E LA N D S C A P E LAN D S C A P E LA N D S C AP E LAN D S C A P E LA N D S C AP E C O N CR E TE S IGN CON C R ET E GR AS S G R A S S LA N D S C AP E C O N C R ET E C ON CR E T E LA N D S C AP E LAN D S C A P E LA N D S C AP E LAN D S C A P E LA N D S C AP E LAN D S C A P E LA N D S C AP E GR A S S LA N D S C A P E A C P A V E M E N T A C P AV E ME N T GR AS S GR A S S C ON CR E T E A S P H A LT A S P HA LT A S P H A LT A S P H A LT C O N C . C O N C . C O N C . A S P HA LT AS P H A LT GR A S S CON C R ET E AS P H A LT GR A S S S IGN S IGN S IGN 1 0 6 0 0 N . T a n t a u A v e T a n t a u 4 10670 N. Tantau Ave Tantau 5 10700 N. Tantau Ave Tantau 6 155 Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive 00 02/25/2015 00 02/25/2015 Planning - Site & Architectural Review MD 2193 Apple, Inc. Key Plan © Foster Partners 2014www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Notes Topographic survey information on these plans has been obtained November 15th, 2012 from Kier & Wright surveyors, dated November 15,2012, and subsequent field survey. Property Line information on these plans has been obtained from Kier & Wright surveyors, dated December, 2014 - Parcel Map. 1. 2. Legend 1 Feet Minor Contour 5 Feet Minor Contour North Tantau Avenue Site A Visitors Center & Parking N N Apple Campus 2, Phase 1 01 P-VC-3.10 Proposed Topography Plan Proposed Topgraphy 1"=30' (1:360) 1"=30' (1:360) 160 160 155 15 5 155 155 160 155 155 160 160 155 155 1 5 5 1 5 5 1 6 0 160 16 0 1 6 0 16 0 155 15 5 15 5 155 155 15 5 x 1 5 1 . 6 x 15 1 . 7 x 1 5 1 . 9 x 15 2 . 1 x 15 2 . 3 x 15 2 . 3 x 1 5 2 .3 x 15 2 . 4 x 1 5 2 . 4 x 1 5 2 . 4 x 15 2 . 5 x 1 5 2 . 6 x 1 5 2 . 6 x 15 2 . 7 x 1 5 2 . 7 x 1 5 2 . 8 x 1 5 2 .9 x 1 5 2 . 9 x 1 5 3 .1 x 1 5 3 . 1 x 1 5 3 .2 x 1 5 3 . 2 x 15 3 . 2 x 1 5 3 .3 x 1 5 3 . 3 x 1 5 3 . 3 x 1 5 3 . 4 x 15 3 . 4 x 15 3 . 5 x 1 5 3 . 5 x 15 3 . 6 x 1 5 3 . 6 x 1 5 3 . 6 x 1 5 3 .7 x 15 3 . 7 x 15 3 . 7 x 1 5 3 . 7 x 1 5 3 . 7 x 1 5 3 .9 x 1 5 4 . 1 x 1 5 4 .2 x 15 4 . 3 x 15 4 . 3 x 1 5 4 . 3 x 1 5 4 . 3 x 1 5 4 .3 x 15 4 . 3 x 15 4 . 4 x 15 4 . 4 x 15 4 . 5 x 15 4 . 5 x 1 5 4 .5 x 15 4 . 6 x 1 5 4 . 6 x 1 5 4 .6 x 1 5 4 . 7 x 15 4 . 7 x 15 4 . 7 x 1 5 4 . 8 x 15 4 . 8 x 15 4 . 8 x 1 5 4 .9 x 1 5 4 .9 x 15 4 . 9 x 15 5 . 0 155 x 1 5 5 . 1 x 1 5 5 .1 x 1 5 5 . 1 x 15 5 . 2 x 1 5 5 .2 x 15 5 . 2 x 1 5 5 . 2 x 1 5 5 . 2 x 1 5 5 . 2 x 1 5 5 . 3 x 15 5 . 3 x 1 5 5 . 3 x 1 5 5 .3 x 15 5 . 3 x 1 5 5 . 3 x 1 5 5 . 3 x 15 5 . 4 x 15 5 . 4 x 15 5 . 4 x 15 5 . 4 x 1 5 5 . 4 x 15 5 . 4 x 1 5 5 . 4 x 15 5 . 4 x 1 5 5 . 4 x 1 5 5 . 4 x 15 5 . 4 x 1 5 5 .5 x 15 5 . 5 x 1 5 5 .5 x 1 5 5 .5 x 15 5 . 5 x 1 5 5 .5 x 15 5 . 5 x 1 5 5 . 5 x 15 5 . 5 x 1 5 5 .5 x 1 5 5 .6 x 15 5 . 6 x 15 5 . 6 x 15 5 . 6 x 15 5 . 6 x 15 5 . 6 x 15 5 . 6 x 1 5 5 .6 x 1 5 5 . 6 x 15 5 . 6 x 15 5 . 6 x 1 5 5 . 6 x 1 5 5 . 7 x 15 5 . 7 x 15 5 . 7 x 1 5 5 . 7 x 1 5 5 . 7 x 15 5 . 7 x 1 5 5 . 7 x 1 5 5 . 7 x 15 5 . 7 x 1 5 5 .7 x 1 5 5 .7 x 15 5 . 7 x 1 5 5 . 7 x 1 5 5 .7 x 15 5 . 8 x 15 5 . 8 x 15 5 . 8 x 15 5 . 8 x 1 5 5 . 8 x 1 5 5 . 8 x 1 5 5 .8 x 1 5 5 . 8 x 1 5 5 .8 x 15 5 . 8 x 1 5 5 . 8 x 15 5 . 8 x 15 5 . 8 x 15 5 . 8 x 15 5 . 8 x 15 5 . 9 x 1 5 5 . 9 x 1 5 5 . 9 x 1 5 5 .9 x 15 5 . 9 x 15 5 . 9 x 1 5 5 . 9 x 15 5 . 9 x 15 5 . 9 x 1 5 5 . 9 x 1 5 5 . 9 x 15 5 . 9 x 1 5 5 . 9 x 15 6 . 1 x 15 6 . 1 x 1 5 6 . 1 x 1 5 6 . 1 x 1 5 6 . 1 x 1 5 6 .1 x 1 5 6 . 1 x 1 5 6 . 2 x 15 6 . 2 x 1 5 6 . 2 x 15 6 . 2 x 15 6 . 3 x 1 5 6 . 3 x 1 5 6 . 3 x 15 6 . 3 x 1 5 6 . 3 x 1 5 6 . 3 x 1 5 6 . 4 x 15 6 . 4 x 15 6 . 4 x 15 6 . 5 x 1 5 6 . 5 x 1 5 6 .5 x 15 6 . 5 x 1 5 6 . 5 x 15 6 . 5 x 1 5 6 .5 x 15 6 . 5 x 1 5 6 . 5 x 1 5 6 . 5 x 1 5 6 .6 x 1 5 6 .6 x 15 6 . 6 x 15 6 . 6 x 1 5 6 . 7 x 1 5 6 . 7 x 1 5 6 .7 x 15 6 . 7 x 1 5 6 .7 x 15 6 . 8 x 15 6 . 8 x 15 6 . 8 x 15 6 . 8 x 1 5 6 . 8 x 1 5 6 . 8 x 1 5 6 . 8 x 15 6 . 9 x 15 7 . 1 x 1 5 7 .1 x 1 5 7 . 2 x 1 5 7 . 2 x 15 7 . 2 x 15 7 . 3 x 15 7 . 3 x 15 7 . 3 x 1 5 7 . 4 x 1 5 7 . 4 x 1 5 7 . 4 x 1 5 7 . 4 x 15 7 . 5 x 1 5 7 .5 x 1 5 7 . 5 x 15 7 . 5 x 15 7 . 5 x 1 5 7 .6 x 1 5 7 .6 x 15 7 . 6 x 1 5 7 . 7 x 1 5 7 . 7 x 1 5 7 . 7 x 15 7 . 7 x 1 5 7 . 8 x 15 7 . 8 x 1 5 7 .8 x 15 7 . 8 x 15 7 . 8 x 1 5 7 .9 x 15 7 . 9 x 15 8 . 1 x 1 5 8 . 1 x 15 8 . 2 x 1 5 8 . 2 x 15 8 . 3 x 1 5 8 . 4 x 15 8 . 4 x 1 5 8 .6 x 15 8 . 6 x 1 5 8 .7 x 15 8 . 8 x 15 8 . 8 x 1 5 8 .8 x 15 8 . 8 x 15 8 . 8 x 15 9 . 3 x 1 5 9 . 3 x 1 5 9 . 4 x 1 5 9 .5 x 15 9 . 6 x 1 5 9 . 7 x 1 5 9 . 7 x 15 9 . 8 x 15 9 . 9 x 16 0 . 2 x 16 0 . 5 x 1 6 0 .6 x 16 1 . 2 x 1 6 1 .3 x 1 6 1 . 5 x 1 6 1 . 5 x 16 1 . 6 16 1 . 8 Building Visitor Center Parking Structure Visitor Center O N L Y ONLY ONLYONLY ONLY O N L Y ONLY EV CPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCP EV EV EV EV EV EV EV EV CPCP CPCP EVEV CP EV EV EV EV EV CP CP CP EV EV EVEVEVEVEV EVEVEVEVEV CPCPCP CP CP EV EV EV EV EV EVEVEV CP EVEVEVEVEV EVEVEVEVEV EVEV CPCPCPCPCPCP P3 P1P2 North Tantau Avenue N ort h T ant au A venu e P r u n e r id g e A v e n u e M a r - C o m m B u il d in g T a n t a u 1 4 F F L + 1 6 0 ' - 0 " FFL +157'-0" FFL Varies 157' to 153' (typ) existing trees to remain Match existing grade at outline (typ) Proposed basement (typ) existing trees to remain Match existing grade at ( t y p ) e x i s t i n g t r e e s t o r e m a in M a t c h e x is t i n g g r a d e a t outline (typ) Proposed basement Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive 03 02/25/2015 00 02/25/2015 Planning - Site & Architectural Review MD 2193 Apple, Inc. © Foster Partners 2014www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Notes 1. 2. 3. 4. 5. Legend North Tantau Avenue Site A Visitors Center & Parking N Existing Tree to Remain 1 Feet Existing Minor Contour 5 Feet Existing Minor Contour Apple Campus 2, Phase 1 N 01 04/20/2015 MDPlanning - Site & Arch. Review Resubmit Surfaces shall be grade to provide positive drainage away from structures and buildings. Minimum slope at paved areas is typically 0.5%, and minimum at landscaped areas is 1% unless subdrainage is provided. Maintain existing grade at all trees to be preserved. Do not disturb grade withing dripline of trees indicated unless otherwise noted. No equipment, stockpiling, or debris may be stored within tree root zone. Preliminary earthwork studies with bank volumes (no soil bulking/shrinkage) are as follows: Visitor Center Basement Cut - 135,000 cubic yards Visitor Center Basement Fill - 5,000 cubic yards 100,000 cubic yards of excavation will be used as fill on the Phase 1 Main Site and Phase 2 sites 30,000 cubic yards of excavation will be off-hauled It is anticipated that 5,000 cubic yards of top soil will be required. Potential strategies to decrease the amount of material to be imported / off-hauled will be further studied during the detailed design process. 03 07/01/2015 Planning - Site Architectural Review MD Varies Street Improvements P-VC-3.2001Street Improvements Key Map 1"=100' (1:1200) 06 07 09 08 11 10 B u il d in g V is it o r C e n t e r P a r k i n g S t r u c t u r e V is it o r C e n t e r ON LY ONLY ONLY ONLY ONLY ONLY ONLY ONLY ONLYONLY ONLY ONLY ONLY O N LY O N LY ON LY +176'-06'' up up +155'-7 1/2" +141 '-6'' +141'-6'' +155'-7 1/2" +156 '-7 1/2" STOP P3 P1 P2 N o r t h T a n t a u A v e n u e N o r t h T a n t a u A v e n u e N o r t h T a n t a u A v e n u e N o rth T a n ta u A v e n u e N o r t h T a n t a u A v e n u e N o r t h T a n t a u A v e n u e Pruneridge Avenue Tantau 12 North Testing Facilities - Parking Structure Tantau 14 Mar-Comm Building Tantau 14 Mar-Comm Building Tantau 14 Calabazas Creek Calabazas Creek CL TravelBike Bike WalkTravel 14' 6.5' 13'7' Sidewalk 37.5' PLPL 37.5' 75' ROW TC TC 7'14'5'5' TurnWalk Sidewalk 5'5' CL Travel 12'11' PL PL TCTC Turn 7'6' WalkTravel 11' Travel 11'7'6' Walk 6' (P) Sidewalk Bike Bike 11'6' Turn Travel / Calabazas Creek Trail Detached Sidewalk (P), 47'47' CL TravelBike 6.75' Bike WalkTravel 14' 6.5' 14.25'13'7' Sidewalk 37.5' PLPL 37.5' 5.5' 75' ROW 4.5'10' TC TC CL WalkTravel 6' Travel Raised Median 12' Curb PLPL 6' Turn 12' 2.25' TC 11'7'7'10'6'6' Walk (P) Detached Sidewalk BikeBike 42'42' Calabazas Creek Trail Detached Sidewalk (P), Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive 01 02/25/2015 00 02/25/2015 Planning - Site & Architectural Review MD 2193 Apple, Inc. © Foster Partners 2014www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Abbreviations Notes 1. 2. 3. Legend Proposed roadway reconfiguration design per coordination with City of Cupertino via 100% DD Package #3 drawings submitted in March 2014. Security fence, soundwall and other features omitted for clarity. Street sections vary throughout project perimeter. Dimensions shown are applicable at section cut locations only. CL Centerline (from Survey Boundary) EX Existing FG Finished grade OG Original grade P Proposed PL Property line ROW Right of way TC Top of existing curb OG - Original Grade PG - Proposed Grade North Tantau Avenue Site A Visitors Center & Parking Apple Campus 2, Phase 1 N 01 04/20/2015 MDPlanning - Site & Arch. Review Resubmit 1''=10'08-A 08-B Tantau Avenue north of Tantau Entrance - Existing Tantau Avenue north of Tantau Entrance - Proposed Reconfiguration 1''=10' 1''=10'09-A 1''=10'09-B Tantau Avenue South of Prunerdige - Existing Tantau Avenue South of Pruneridge - Proposed Reconfiguration Varies Street Improvements P-VC-3.2101Street Improvements Key Map 1"=100' (1:1200) 06 07 09 08 11 10 B u il d in g V is it o r C e n t e r P a r k i n g S t r u c t u r e V is it o r C e n t e r ON LY ONLY ONLY ONLY ONLY ONLY ONLY ONLY ONLYONLY ONLY ONLY ONLY O N LY O N LY ON LY +176'-06'' up up +155'-7 1/2" +141 '-6'' +141'-6'' +155'-7 1/2" +156 '-7 1/2" STOP P3 P1 P2 N o r t h T a n t a u A v e n u e N o r t h T a n t a u A v e n u e N o r t h T a n t a u A v e n u e N o rth T a n ta u A v e n u e N o r t h T a n t a u A v e n u e N o r t h T a n t a u A v e n u e Pruneridge Avenue Tantau 12 North Testing Facilities - Parking Structure Tantau 14 Mar-Comm Building Tantau 14 Mar-Comm Building Tantau 14 Calabazas Creek Calabazas Creek CL Travel WalkTravel 14' PL PL TC TC 6'6' Walk 6'6' (P) Sidewalk (P) Sidewalk Bike Lane Buffered Bike Lane Buffered CL TravelBike Bike WalkTravel 14'14' Sidewalk 37.5' PLPL 37.5' 75' ROW TC TC 14'5'5' TurnWalk Sidewalk 5'5' 7' 6.5'6.5' 39'41' Turn 8.5'12'12'8.5' PL Sidewalk Bike PL Sidewalk TC TC 12' Travel Travel CL Turn 11'12'6.5' Walk 5'4.5'12' Travel 12' TravelBike 7' Walk 5'4.5' 46.5'45' 91.5' ROW PL Bike PL TC TC Travel 12' Walk 6'12'12' Walk 6'6' Bike 6'6'6' Turn Bike Turn/ (P) Sidewalk Calabazas Creek Trail Detached Sidewalk (P), 47.5' CL 91.5' ROW 5.5' 44.5' 14.5' Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive 01 02/25/2015 00 02/25/2015 Planning - Site & Architectural Review MD 2193 Apple, Inc. © Foster Partners 2014www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Abbreviations Notes 1. 2. 3. Legend Proposed roadway reconfiguration design per coordination with City of Cupertino via 100% DD Package #3 drawings submitted in March 2014. Security fence, soundwall and other features omitted for clarity. Street sections vary throughout project perimeter. Dimensions shown are applicable at section cut locations only. CL Centerline (from Survey Boundary) EX Existing FG Finished grade OG Original grade P Proposed PL Property line ROW Right of way TC Top of existing curb OG - Original Grade PG - Proposed Grade North Tantau Avenue Site A Visitors Center & Parking Apple Campus 2, Phase 1 01 04/20/2015 MDPlanning - Site & Arch. Review Resubmit 1''=10' 1''=10' 10-A 10-B Tantau Avenue near Transit Center - Existing Tantau Avenue near Transit Center - Proposed Reconfiguration 1''=10' 1''=10' Pruneridge Avenue - Existing11-A Pruneridge Avenue - Proposed11-B 01 P-VC-3.30 Proposed Storm Water Control Plan Proposed Storm Water Control 1"=30' (1:360) 1"=30' (1:360) DI- R IM 15 1 . 3 5 IN V 14 8 . 1 5 1 2 " ( I N- E) IN V 14 8 . 1 0 1 2 " ( O U T- W) CB -TC 15 4 .48INV 149 .63 12 " (IN -E ) INV 149 .68 12 " (OU T -W ) CB -TC 15 4 .60 INV 149 .70 15 " (IN -W ) INV 149 .60 15 " (OUT -E ) CB-TC 151.76 INV 147.66 18" (IN-W) INV 147.56 18" (OUT-E) CB-TC 155.56 INV 152.10 6" (IN-SW) INV 151.61 12" (OUT-S) SDMH-RIM 151.82 INV 147.57 12" (IN-E) INV 147.51 18" (IN-W) INV 146.12 33" (IN-S) INV 146.07 33" (OUT-N) SDMH-RIM 152.95 INV 146.53 12" (IN-E)INV 146.41 33" (IN-S)INV 146.36 33" (OUT-N) SDMH -R IM 154 .75 INV 14 8 .97 12 " (IN -E ) INV 148 .68 15 " (IN -W ) INV 147 .74 33 " (IN -S ) INV 147 .67 33 " (OUT -N ) S DMH- R IM 1 5 7 . 0 7 IN V 15 0 . 3 7 1 5 " ( I N - S ) IN V 15 0 . 3 7 3 0 " ( I N- E) IN V 14 8 . 9 7 3 3 " ( I N- W) IN V 14 8 . 7 7 3 3 " ( O U T- N ) S DMH - R IM 1 5 7 . 1 8 INV 1 5 0 .5 7 12 " ( I N - N) INV 1 4 9 .7 9 15 " ( I N - S ) INV 1 4 9 .3 7 3 0 " ( I N - W) INV 1 4 9 .2 9 3 3 " ( OU T- E ) S DMH- RIM 15 7 . 9 4 IN V 15 2 . 3 5 1 0 " ( I N- W) IN V 15 1 . 7 4 1 2 " ( O U T- N ) IN V 15 1 . 7 4 1 0 " ( I N - E ) S D C B - TC 15 5 . 3 7 IN V 15 1 . 4 6 1 2 " ( I N - N) IN V 15 1 . 4 6 1 2 " ( I N - S ) IN V 15 1 . 4 2 1 2 " ( O U T- N W) 12"SD ~ ~ ~ S DMH - R IM 1 5 6 .6 8 IN V 1 5 1 .6 3 12 " ( I N - S E) IN V 1 5 1 .2 3 12 " ( I N - S W) IN V 1 5 1 .1 7 12 " ( I N - N) IN V 1 5 1 .1 6 12 " ( OU T- E ) ~ ~ ~ 12 " S D 1 2 " S D 1 2 " S D 12" SD ~ C B - TC 15 5 . 4 1 DI- R IM 15 8 . 9 8 C B - TC 15 5 . 7 2 INV 1 5 0 .9 2 12 " ( I N - NW) INV 1 5 0 .7 6 12 " ( OU T- NE) C B - TC 1 5 7 .6 5 IN V 15 0 . 4 6 12 " ( I N- N W) IN V 15 0 . 2 5 12 " ( I N- S W) IN V 15 0 . 2 1 1 8 " ( O U T- N E ) C B - TC 1 5 7 . 8 6 IN V 14 9 . 8 1 1 8 " ( T HRU) C B - TC 15 5 . 2 3 INV 1 4 9 .6 2 18 " ( I N - W) INV 1 4 9 .5 9 18 " ( OU T- NE) 12" SD 12 " S D 18" S D 1 8 " S D INV 1 5 3 . 4 2 12 " ( I N- N ) INV 1 5 3 . 3 4 12 " ( I N- N W) INV 1 5 3 . 3 2 12 " ( I N- W) INV 1 5 3 . 3 1 12 " ( O U T- S E ) 12" SD C B - TC 1 5 5 . 2 6 IN V 15 0 . 9 5 12 " ( I N- N E) IN V 14 9 . 2 4 18 " ( I N- S ) IN V 14 9 . 0 8 18 " ( O U T- N ) 18" S D C B - TC 15 6 . 5 2 INV 1 5 1 . 0 7 12 " ( I N- W) INV 1 5 1 . 0 2 15 " ( OU T - N ) 15" SD 1 2 " S D DI- R IM 1 5 6 . 3 2 INV 1 5 1 . 4 6 10 " ( I N- S ) INV 1 5 1 . 4 2 12 " ( I N- E) ~ ~ 3 0 " S D 12" SD 3 3 " S D 33" SD 12 " S D 12" SD 1 0 " S D 15 " S D 3 3 " SD 3 3 " SD 12 " S D 12 " S D 1 8 " S D Building Visitor Center Parking Structure Visitor Center O N L Y ONLY ONLYONLY ONLY O N L Y ONLY EV CPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCP EV EV EV EV EV EV EV EV CPCP CPCP EVEV CP EV EV EV EV EV CP CP CP EV EV EVEVEVEVEV EVEVEVEVEV CPCPCP CP CP EV EV EV EV EV EVEVEV CP EVEVEVEVEV EVEVEVEVEV EVEV CPCPCPCPCPCP P3 P1P2 North Tantau Avenue N ort h T ant au A venu e P r u n e r id g e A v e n u e M a r - C o m m B u il d in g T a n t a u 1 4 Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive 03 02/25/2015 00 02/25/2015 Planning - Site & Architectural Review MD 2193 Apple, Inc. © Foster Partners 2014www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Notes Legend Capacity of the existing systems at points of connection to be confirmed. Preliminary storm drainage layout shows major pipe network, details such as pipe sizes, invert elevations, manholes, etc to be determined. Stormwater quality Best Management Practices (BMP's) will be designed in accordance with City of Cupertino requirements and the Santa Clara Valley Urban Runoff Pollution Prevention Program NPDES permit (C.3). BMP's are illustratively shown with areas approximately 4% of the contributing impervious watershed. Treatment areas are shown illustratively, pending coordination with landscape design to be determined. 1. 2. 3. 4. Proposed Storm Drain Potential stormwater quality treatment/conveyance area North Tantau Avenue Site A Visitors Center & Parking N Apple Campus 2, Phase 1 N 01 04/20/2015 MDPlanning - Site & Arch. Review Resubmit 03 07/01/2015 Planning - Site Architectural Review MD Overflow drain with mesh insert Connect to storm drain Drain mat and waterproofing Mulch and filter fabric, typ. Sidewalk paving Street paving Curb cut - drain inlet Concrete curb & gutter Standard tree grate Subgrade Planting Subgrade Note To storm drain varies area Bottom (typ.) 3:1 side slopes Vegetated ground cover Perforated overflow pipe architect per landscape planting soil mix 18" min filter media Notes Standpipe 1:1 side slope 3" stone or mulch Inlet 1:1 Side slope Native soil mix per landscape architect 18" min filter media planting soil 0.5% min Variable side slope 3:1 max. 6" min drain storm To 2" min Vegetated ground cover 4" 8" area not to exceed 2% Slope of main bioretention Freeboard depth varies (min 3") Vegetated ground cover Height 2' to 6' (20' to 40' top width) 10' bottom width typical within 10 feet of structure where bioretention area is Waterproof lining required soil for erosion control. geotextile between cobbles and of 2' either side of inlet. Place (grouted in place) for min distance 4" min diameter approved cobble architect Soil per landscape planted. based on tree species area to be determined area. Radius of treeless No tree planting in this landsape architect Planting type per 2" min pea gravel 2% m a x finished grade. See Note 4 Cleanout with cap at Detail 08. spacings. Trash screen per Overflow riser at max 100 feet per Detail 08. of planting area. Trash screen spacings. 12" above low point Overflow riser at max 100ft architect Soil per landscape to storm drain Underdrain, connected planter drain. Place just above base of Underdrain, connected to storm 4. 3. 2. 1. Ponding depth 12" Bottom width 6ft Area, Detail 01 Bioretention Build-up per Detail 01 Bioretention Area, cleanouts) per Underdrains (including Note 1. 1 ft (typ.) per landscape architect medium planting soil mix Min 18" depth fllter at finish grade. Cleanout with cap drainage rock 12" depth waterproof membrane planter wall with Concrete structural Connect to storm drain Detail 01. Omitted for clarity. Overflow risers shall be included per Biorention Area surround min 6" drain rock. connected to storm drain. Pipe Underdrain, min 4" perforated pipe slope 3:1 max. side 6' bottom width (typ.) slope 3:1 max. side (0.1% - 0.5% typ) shallow longitudinal slope Swales typically have (0.1% - 0.5% typ) shallow longitudinal slope Swales typically have centers. x 12" drain box at 100 feet Overflow riser with grate. 12" 12" min drain rock. and at curb cuts. Grouted rip rap apron to be provided at connections to buildings tight cap fit flush with the biotreatment soil surface. vertical, rigid, non- perforated HDPE pipe ( min 4") with a water A cleanout shall be provided for underdrains, consisting of a the drain rock. the underdrain or between the filter media planting soil mix and To avoid clogging, filter fabric should not be used in or around point. at a minimum 0.5% slope toward the storm drain or discharge Underdrains shall be placed with perforations facing downward, Minimum two rows of perforations shall be provided. perforated pipe connecting to a storm drain or discharge point. The underdrain shall consist of a minimum 4" diameter the base of the trench. waterproof fabric. Otherwise underdrains should be installed at least 6" above If waterproof lining is included, underdrains should be placed just above the biotreatment soil surface. perforated HDPE pipe (min 4") with a water tight cap fit flush with the A cleanout shall be provided for underdrains, consisting of a vertical, rigid, non- between the filter media planting soil mix and the drain rock. To avoid clogging, filter fabric should not be used in or around the underdrain or downward, at a minimum 0.5% slope toward the storm drain or discharge point. shall be provided. Underdrains shall be placed with perforations facing connecting to a storm drain or discharge point. Minimum two rows of perforation The underdrain shall consist of a minimum 4" diameter perforated pipe 4. 3. 2. 1. P-3.31 Typical Details Stormwater Quality BMP Not to Scale Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive 00 02/25/2015 00 02/25/2015 Planning - Site & Architectural Review MD 2193 Apple, Inc. Key Plan © Foster Partners 2014www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue North Tantau Avenue Site A Visitors Center & Parking N Apple Campus 2, Phase 1 NTS04 NTS05Bioretention Swale NTS01 NTS07Conveyance Swale Flow through planter NTS06Overflow Conveyance Swale for Large Rainfall Events Bioretention Area Elevation Plan NTS02Bioretention Tree Planter Existing Utilities 01 P-VC-3.40 Existing Utilities Plan 1"=30' (1:360) 1"=30' (1:360) North Tantau Avenue N ort h T ant au A venu e P r u n e r id g e A v e n u e STOP STOP STOP STOP STOP SLOW BUMP 35 35 STOP DI- R IM 1 5 1 .3 5 IN V 1 4 8 . 15 12 " ( I N - E ) IN V 1 4 8 . 10 12 " ( OU T- W) CB -TC 154 .48INV 149 .63 12 " (IN -E ) INV 149 .68 12 " (OUT -W ) CB -TC 154 .60 INV 149 .70 15 " (IN -W ) INV 149 .60 15 " (OUT -E ) CB-TC 151.76 INV 147.66 18" (IN-W) INV 147.56 18" (OUT-E) CB-TC 155.56 INV 152.10 6" (IN-SW) INV 151.61 12" (OUT-S) S S MH- R IM 15 2 . 2 5 INV 1 4 0 .6 5 2 7 " ( TH R U ) S S MH- RIM 15 5 . 3 8 IN V 1 4 4 . 8 6 8 " ( I N- W) SSMH-RIM 157.04 INV 145.76 10" (IN-S) INV 145.63 8" (IN-E) INV 143.74 27" (IN-W) INV 143.68 27" (OUT-N) TS B TS B S LB TS B TS B 10"VCP E V E B EB EB TB WB E MH ( 3 0 2 ) E V E V TS B TS B TS B WB EV E V ( 2 ) E B S S CO S S C O S S MH S S MH E B C A B TS B EL MET E R TS B TMH( A T& T 7 7 - 1 ) TS B E B S LB TS B TS B FO B TS B TB ( S B 7 4 - 2 2 6 ) TB ( S B 8 3 - 4 1 1 ) TS B TS B E B EL CAB E V E V EB C OMM S S C O EB EV S LB S LB S LB S S C O SDMH-RIM 151.82 INV 147.57 12" (IN-E) INV 147.51 18" (IN-W) INV 146.12 33" (IN-S) INV 146.07 33" (OUT-N) SDMH-RIM 152.95 INV 146.53 12" (IN-E)INV 146.41 33" (IN-S)INV 146.36 33" (OUT-N) SDMH -R IM 154 .75 INV 148 .97 12 " (IN -E ) INV 148 .68 15 " (IN -W ) INV 147 .74 33 " (IN -S ) INV 147 .67 33 " (OUT -N ) S DMH - R IM 1 5 7 . 0 7 INV 1 5 0 . 3 7 15 " ( I N - S ) INV 1 5 0 . 3 7 3 0 " ( I N - E ) INV 1 4 8 . 9 7 3 3 " ( I N - W) INV 1 4 8 . 7 7 3 3 " ( OU T- N) S DMH- R IM 15 7 . 18 IN V 15 0 . 5 7 1 2 " ( I N - N ) IN V 14 9 . 7 9 1 5 " ( I N - S ) IN V 14 9 . 3 7 3 0 " ( I N- W) IN V 14 9 . 2 9 3 3 " ( O U T- E) S S MH AC P AV EMEN T A C P A V E ME NT CONCRETE WALK CON C R ET E WA LK S S C O G R AS S G R AS S GR A S S GR A S S A C P A V E ME NT AC P A V EMEN T A C P A V E ME NT AC P A V EMEN T A C P AV E ME N T AC P A V EMENT AC P A V EMEN T CONCRETE CONCRETE C O N C R E T E C O N C R ET E CON C R ET E CON CR ETE CONCR ETE CON CRETE CON C R ET E GA TE GR AS S GR A S S TE NT GR A S S GR A S S GR A S S GR A S S GRAS S A C P AV EME N T AC P A V EMEN T S IGN S IGN S IGN P E D S IGN H o s e B ib BUILDING 4 6 T TE N T TE N T C O N C R E T E C O N C R ET E C O N CR E T E LAN D S C A P E LA N D S C AP E C ON C R E T E LA N D S C A P E LA N D S C AP E LA N D S CA P E LAN D S C A P E GR AV E L GR A V EL DIR T C ON C R E T E LA N D S C A P E LA N D S CAP E LAN D S C A P E LAN D S C A P E LA N D S C AP E LA N D S C A P E LAN D S C A P E LA N D S C AP E LAN D S C A P E LA N D S C AP E C O N CR E TE S IGN CON C R ET E GR AS S G R A S S LA N D S C AP E C O N C R ET E C ON CR E T E LA N D S C AP E LAN D S C A P E LA N D S C AP E LAN D S C A P E LA N D S C AP E LAN D S C A P E LA N D S C AP E GR A S S LA N D S C A P E A C P A V E M E N T A C P AV E ME N T E V E B E B INV 1 4 2 .8 0 8 " ( I N - W) INV 1 4 2 .6 6 8 " ( I N - E) IN V 1 4 4 . 8 3 8 " ( I N- E) IN V 1 4 2 . 7 2 2 7 " ( T HRU) S DMH - R IM 1 5 7 . 9 4 INV 1 5 2 .3 5 10 " ( I N - W) INV 1 5 1 . 7 4 12 " ( OU T- N) INV 1 5 1 . 7 4 10 " ( I N - E ) S D CB - TC 1 5 5 . 3 7 INV 1 5 1 . 4 6 12 " ( I N- N ) INV 1 5 1 . 4 6 12 " ( I N- S ) INV 1 5 1 . 4 2 12 " ( O U T- N W) 12"SD ~ ~ G ~ ~ ~ ~ GR AS S GR A S S C ON CR E T E A S P H A LT A S P HA LT A S P H A LT A S P H A LT C O N C . C O N C . C O N C . A S P HA LT AS P H A LT GR A S S CON C R ET E AS P H A LT GR A S S TS B E B S S MH- R IM 15 6 . 3 9 INV 1 5 0 .0 4 8 " ( O U T- W) INV 1 5 0 .0 2 8 " ( O U T- E) INV 1 4 9 .9 8 8 " ( I N - S ) S S MH - R IM 1 5 6 . 6 7 IN V 14 9 . 2 7 8 " ( I N - W) IN V 14 8 . 5 2 1 0 " ( I N- E) IN V 14 8 . 3 5 1 0 " ( I N- S ) IN V 14 8 . 3 3 1 0 " ( O U T- N ) ~ 8" SS ~ ~ 1 0 " S S S DMH- R IM 15 6 . 6 8 IN V 15 1 . 6 3 1 2 " ( I N- S E ) IN V 15 1 . 2 3 1 2 " ( I N- S W) IN V 15 1 . 17 1 2 " ( I N - N ) IN V 15 1 . 16 1 2 " ( O U T- E) ~ ~ ~ 1 2" S D 1 2 " S D 1 2 " S D 12" SD ~ ~10"SS 8 " S S 10"SS C B - TC 1 5 5 . 4 1 F O MH ~ 3" GAS G 1 " G A S 1 / 2 " G A S DI- R IM 1 5 8 . 9 8 C B - TC 1 5 5 . 7 2 IN V 15 0 . 9 2 1 2 " ( I N- N W) IN V 15 0 . 7 6 1 2 " ( O U T- N E ) C B - TC 15 7 . 6 5 IN V 1 5 0 . 4 6 1 2 " ( I N - NW) IN V 1 5 0 . 2 5 1 2 " ( I N - S W) IN V 1 5 0 . 2 1 18 " ( OU T- NE ) C B - TC 1 5 7 . 8 6 INV 1 4 9 . 8 1 18 " ( TH R U ) C B - TC 1 5 5 .2 3 IN V 14 9 . 6 2 1 8 " ( I N- W) IN V 14 9 . 5 9 1 8 " ( O U T- N E ) S DMH- R IM 1 5 7 . 8 2 IN V 14 8 . 0 4 6 " ( I N- W) IN V 14 6 . 12 1 8 " ( I N - S ) IN V 14 6 . 0 6 1 8 " ( O U T- N ) F O B 12" SD 12 " SD 18" S D 1 8 " S D IN V 15 3 . 4 2 1 2 " ( I N - N ) IN V 15 3 . 3 4 1 2 " ( I N - N W) IN V 15 3 . 3 2 1 2 " ( I N - W) IN V 15 3 . 3 1 1 2 " ( O U T- S E ) 12" SD C B - TC 15 5 . 2 6 IN V 1 5 0 . 9 5 1 2 " ( I N - NE ) IN V 1 4 9 . 2 4 1 8 " ( I N - S ) IN V 1 4 9 . 0 8 1 8 " ( O U T- N ) 18 " SD E B C B - TC 1 5 6 . 5 2 IN V 15 1 . 0 7 1 2 " ( I N - W) IN V 15 1 . 0 2 1 5 " ( O U T- N ) 15" SD 1 2 " S D DI- R IM 15 6 . 3 2 IN V 15 1 . 4 6 1 0 " ( I N - S ) IN V 15 1 . 4 2 1 2 " ( I N - E ) S IGN S IGN WB ~ ~ 8 " V C P 8 " V C P 8 " V C P 8 " V C P 8 " V C P P E D F O C AB IN E T EB E B S IGN F O B GV 8 " F S 8 " FS 12" ACP 6 " A C P TMH( A T& T 7 7 - 1) 4 " G A S (2)5" DUCT (CONCRETE ENCASED) 3 0 " S D 12" SD 3 3 " S D 33" SD 12 " S D 12" SD 1 0 " S D 15 " S D 3 3 " SD 3 3 " SD 12 " S D 12 " S D 1 8 " S D 2 7 " V C P 27" VCP 2 7 " VC P ( 2 ) 5 " D UC T ( C O NC R E T E E N C A S ED ) TS B TS B S S C O R IM 1 5 6 . 6 6 ~ A T& T VA U LT DO U B LE MH G 4" FS 1 0 6 0 0 N . T a n t a u A v e T a n t a u 4 N =96 7 0 .0 0 E=119 16 .75 N =9 63 3 .6 6 E=11 8 84 .88 N=10090.93 E=12014.98 12 6 8 ss t i e in S S S T U B + / - + / - 1 5 6 .4 6 J O IN T T R E N C H LIN E IS S T UBE D IN T O BO X AS PER RO S E ND IN ELE CT RIC AS-BUILT S 1 5 6 .8 0 + /- jo in t tre n c h A p p l e F ib e r 3" Gas 12" Water 27" Sanitary Sewer Telecomm Electrical 33" Storm Drain 10700 N. Tantau Ave Tantau 6 10670 N. Tantau Ave Tantau 5 Pruneridge utility relocation constructed per AC2 Joint trench recently Apple Fiber 1 5 2 .9 0 J O IN T T R E N C H 1 5 7 .4 7 J O IN T T R E N C H 1 5 2 .9 5 J O IN T T R E N C H 1 5 3 .0 0 J O IN T T R E N C H 1 5 6 .7 0 jo in tt re n c h 1 5 6 .6 2 P V 1 5 6 .5 9 P V 1 5 8 .0 0 + /- J O IN T T R E N C H 10 3 7 8 15 1 .02 9 jointt re nch 1 5 1 .0 3 jo in tt re n c h 10 3 1 7 15 1 .4 5 7 c on d u it 10 3 2 1 15 1 .45 7 con d u it 10 3 7 5 15 1 .4 5 7 jointt renc h 1 5 1 .4 6 c o n d u it 1 5 3 .0 9 c o n d u it 1 5 3 .4 6 jo in tt re n c h 1 5 2 .5 2 c o n d u it 1 5 2 .6 2 c o n d u it 10 3 7 7 15 1 .56 6 jointt rench 1 5 1 .5 7 jo in tt re n c h 10 3 7 6 15 2 .0 8 8 jo intt ren ch 1 5 2 .0 9 jo in tt re n c h 10 3 2 0 15 2 .71 9 con d u it 1 5 2 .7 2 c o n d u it 11 0 4 5 15 2 .7 2 6 vault 10 3 1 9 15 2 .74 9 con d u it 1 5 2 .7 6 U B < P T C O M M U N IC AT IO N S 10 3 1 8 15 2 .77 8 c on d u it 1 5 2 . 7 8 C T V< P T 1 5 2 .7 8 U B < P T C O M M U N IC AT IO N S 1 5 2 .7 9 U B < P T C O M M U N IC A T IO N S 1 5 2 .7 9 C T V < P T 1 5 2 .7 9 C T V < P T 11 0 4 4 15 2 .80 0 va ult 1 5 2 .9 9 U B < P T M C I 1 5 2 .9 0 J O IN T T R E N C H 1 5 3 .0 5 U B < P T M C I 1 5 3 .0 7 TM H AT T 1 5 3 .0 9 U B < P T M C I 1 5 3 .1 0 U B < P T S V P C O M M U N IC A T IO N S 1 5 3 .1 1 U B < P T S V P C O M M U N IC A T IO N S 1 5 3 .1 2 U B < P T S V P C O M M U N IC A T IO N S 10 3 1 6 15 4 .03 9 con d u it 1 5 4 .0 4 c o n d u it 10 3 7 4 15 4 .4 1 1 jointt re nch 1 5 4 .4 1 jo in tt re n c h 10 3 1 5 15 4 .44 8 c on d u it 1 5 4 .4 5 c o n d u it 10 6 3 4 15 4 .55 2 va u lt 10 6 3 5 15 4 .56 9 va ult 1 5 4 .5 8 E V < P T 1 5 4 . 6 0 E V < P T 10 3 7 3 15 4 .60 8 jointt rench 1 5 4 .6 1 jo in tt re n c h 1 5 4 .6 1 E V < P T 10 6 3 7 15 4 .62 3 va ult 10 6 3 6 15 4 .69 6 vau lt 11 2 6 1 15 5 .16 8 co n d u it 1 5 5 .1 7 c o n d u it 10 3 7 2 15 5 .2 1 3 jointt re nch 1 5 5 .2 1 jo in tt re n c h 10 3 7 0 15 5 .48 7 jointt renc h 1 5 5 .4 9 jo in tt re n c h 1 5 5 . 6 1 C T V< P T 1 5 5 .6 6 C T V < P T 1 5 5 .6 8 C T V< P T 10 3 4 0 15 5 .70 1 jointt re nch 1 5 5 .7 0 jo in tt re n c h 1 5 5 . 8 3 U B < P T C O M M U N IC A TIO N 1 5 5 .8 6 U B < P T C O M M U N IC A T IO N 1 5 5 .8 8 U B < P T C O M M U N IC AT IO N 1 5 7 .0 0 + /- jt w y e 1 5 7 .0 2 + /- jt w y e 10 3 3 9 15 5 .98 2 jointt renc h 1 5 5 .9 8 jo in tt re n c h TMH( A T& T 7 4 - 7 5 ) CABINE T ( AT& T 7 4 - 7 5 ) ( A T& T # 1 0 7 1 0 ) 10 1 2 3 15 6 .03 9 ss 1 5 6 .0 4 s s 1 4 3 .9 6 in v 10 3 4 1 15 6 .07 1 jointt re nch 1 5 6 .0 7 jo in tt re n c h 10 3 3 8 15 6 .2 4 2 jo in t t ren ch 11 2 1 4 15 6 .24 1 ss 1 5 6 . 2 4 s s 1 5 6 .2 4 jo in tt re n c h 1 5 6 .3 8 J O IN T T R E N C H 1 5 6 .4 5 jo in tt re n c h 10 3 3 7 15 6 .70 8 jointt rench 1 5 6 .7 1 jo in tt re n c h 1 5 6 .7 1 T M H AT T 1 5 6 .7 0 + /- jo in t tre n c h 10 3 3 5 15 6 .8 6 1 jo intt ren ch 1 5 6 .8 6 jo in tt re n c h 10 3 6 4 15 6 .92 7 jointt renc h 1 5 6 . 9 3 jo in tt re n c h 1 5 7 .0 5 U B < P T M C I 1 5 7 .2 3 U B < P T M C I 10 3 6 6 15 7 .50 7 jointt renc h 1 5 7 .5 1 jo in tt re n c h 10 3 6 8 15 7 .57 9 jointt renc h 1 5 7 .5 8 jo in tt re n c h 1 5 7 .7 0 M H T IE IN 1 5 7 . 7 2 U B < P T M C I 1 5 8 .3 7 U B -C L P T &T 1 5 3 .0 0 J O IN T T R E N C H 1 5 2 .8 0 J O IN T T R E N C H 1 5 6 .5 1 J O IN T T R E N C H Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive 00 02/25/2015 00 02/25/2015 Planning - Site & Architectural Review MD 2193 Apple, Inc. Key Plan © Foster Partners 2014www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Notes Topographic survey information on these plans has been obtained November 15th, 2012 from Kier & Wright surveyors, dated November 15,2012, and subsequent field survey. Property Line information on these plans has been obtained from Kier & Wright surveyors, dated December, 2014 - Parcel Map. 1. 2. Legend Water/Fire Service Sanitary Sewer Gas Electrical Fiber Optic/Telecomm Storm Drainage North Tantau Avenue Site A Visitors Center & Parking N N Apple Campus 2, Phase 1 Proposed Utilities 01 P-VC-3.50 Proposed Utilities Plan 1"=30' (1:360) 1"=30' (1:360) DI- R IM 15 1 . 3 5 IN V 14 8 . 1 5 1 2 " ( I N- E) IN V 14 8 . 1 0 1 2 " ( O U T- W) CB -TC 15 4 .48INV 149 .63 12 " (IN -E ) INV 149 .68 12 " (OU T -W ) CB -TC 15 4 .60 INV 149 .70 15 " (IN -W ) INV 149 .60 15 " (OU T -E ) CB-TC 151.76 INV 147.66 18" (IN-W) INV 147.56 18" (OUT-E) CB-TC 155.56 INV 152.10 6" (IN-SW) INV 151.61 12" (OUT-S) S S MH - R IM 1 5 2 . 2 5 IN V 14 0 . 6 5 2 7 " ( TH R U ) S S MH - R IM 1 5 5 . 3 8 IN V 14 4 . 8 6 8 " ( I N - W) SSMH-RIM 157.04 INV 145.76 10" (IN-S) INV 145.63 8" (IN-E) INV 143.74 27" (IN-W) INV 143.68 27" (OUT-N) S LB TS B TS B 10"VCP EV EB E B E B TB WB EMH ( 3 0 2 ) EV EV TS B TS B TS B WB EB C A B TS B E L ME T E R TS B TMH ( A T& T 7 7 - 1) TS B EB S LB T S B TS B TB ( S B7 4 - 2 2 6 ) TB ( S B 8 3 - 4 1 1 ) TS B E V S LB S LB S LB SDMH-RIM 151.82 INV 147.57 12" (IN-E) INV 147.51 18" (IN-W) INV 146.12 33" (IN-S) INV 146.07 33" (OUT-N) SDMH-RIM 152.95INV 146.53 12" (IN-E)INV 146.41 33" (IN-S)INV 146.36 33" (OUT-N) SDMH -R IM 154 .75 INV 148 .97 12 " (IN -E ) INV 148 .68 15 " (IN -W ) INV 147 .74 33 " (IN -S ) INV 147 .67 33 " (OUT -N ) S DMH- R IM 1 5 7 . 0 7 IN V 15 0 . 3 7 1 5 " ( I N - S ) IN V 15 0 . 3 7 3 0 " ( I N- E) IN V 14 8 . 9 7 3 3 " ( I N- W) IN V 14 8 . 7 7 3 3 " ( O U T- N ) S DMH - R IM 1 5 7 . 1 8 INV 1 5 0 .5 7 12 " ( I N - N) INV 1 4 9 .7 9 15 " ( I N - S ) INV 1 4 9 .3 7 3 0 " ( I N - W) INV 1 4 9 .2 9 3 3 " ( OU T- E ) S S C O E V EB EB IN V 14 2 . 8 0 8 " ( I N - W) IN V 14 2 . 6 6 8 " ( I N - E ) IN V 14 4 . 8 3 8 " ( I N - E ) IN V 14 2 . 7 2 2 7 " ( TH R U ) S DMH- RIM 15 7 . 9 4 IN V 15 2 . 3 5 1 0 " ( I N- W) IN V 15 1 . 7 4 1 2 " ( O U T- N ) IN V 15 1 . 7 4 1 0 " ( I N - E ) S D C B - TC 15 5 . 3 7 IN V 15 1 . 4 6 1 2 " ( I N - N) IN V 15 1 . 4 6 1 2 " ( I N - S ) IN V 15 1 . 4 2 1 2 " ( O U T- N W) 12"SD ~ G ~ TS B E B S S MH - R IM 1 5 6 . 3 9 IN V 15 0 . 0 4 8 " ( OU T- W) IN V 15 0 . 0 2 8 " ( OU T- E ) IN V 14 9 . 9 8 8 " ( I N - S ) S S MH- RIM 15 6 . 6 7 INV 1 4 9 .2 7 8 " ( I N- W) INV 1 4 8 .5 2 10 " ( I N - E ) INV 1 4 8 .3 5 10 " ( I N - S ) INV 1 4 8 .3 3 10 " ( OU T- N) ~ 8" SS ~ ~ 1 0 " S S S DMH - R IM 1 5 6 .6 8 IN V 1 5 1 .6 3 12 " ( I N - S E) IN V 1 5 1 .2 3 12 " ( I N - S W) IN V 1 5 1 .1 7 12 " ( I N - N) IN V 1 5 1 .1 6 12 " ( OU T- E ) ~ ~ ~ 12 " S D 1 2 " S D 1 2 " S D 12" SD ~ ~10"SS 8 " S S 10"SS C B - TC 15 5 . 4 1 F OMH ~ 1 " G A S C B - TC 15 6 . 5 2 INV 1 5 1 . 0 7 12 " ( I N- W) INV 1 5 1 . 0 2 15 " ( OU T - N ) 15" SD DI- R IM 1 5 6 . 3 2 INV 1 5 1 . 4 6 10 " ( I N- S ) INV 1 5 1 . 4 2 12 " ( I N- E) 8 " V C P 8 " V C P 8 " V C P 8 " VC P 8 " V C P FOB GV 8 " F S 8 " FS 12" ACP 6 " A C P TMH ( A T& T 7 7 - 1 ) (2)5" DUCT (CONCRETE ENCASED) 12" SD 3 3 " S D 33" SD 12 " S D 12" SD 1 0 " S D 15 " S D 3 3 " SD 3 3 " SD 12 " S D 12 " S D 1 8 " S D 27" VCP 2 7 " VC P TS B TS B S S C O R IM 15 6 . 6 6 AT& T VA U LT DO U BLE MH 4" FS P G& E 2 0 0 9 8 S W- 11 2 2 6 S W- 5 2 2 3 0 WB S W- 5 9 9 8 TMH ( A T& T 7 4 - 7 5 ) C A B IN E T ( A T& T 7 4 - 7 5 ) ( AT& T # 1 0 7 1 0 ) Building Visitor Center Parking Structure Visitor Center O N L Y ONLY ONLYONLY ONLY O N L Y ONLY EV CPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCP EV EV EV EV EV EV EV EV CPCP CPCP EVEV CP EV EV EV EV EV CP CP CP EV EV EVEVEVEVEV EVEVEVEVEV CPCPCP CP CP EV EV EV EV EV EVEVEV CP EVEVEVEVEV EVEVEVEVEV EVEV CPCPCPCPCPCP P3 P1P2 M a r - C o m m B u il d in g T a n t a u 1 4 box existing electrical Connect to drainage existing storm Connect to service lateral existing fire Connect to sewer lateral existing sanitary Connect to service lateral existing water Connect to sewer lateral existing sanitary Connect to infrastructure Apple fiber infrastructure Apple fiber drainage existing storm Connect to drainage existing storm Connect to Upgraded water line Hydrant Proposed Fire Hydrant Proposed Fire telecomm box existing Connect to the parking ordinance comply with the standards of Surface Parking lot lighting will Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive 03 02/25/2015 00 02/25/2015 Planning - Site & Architectural Review MD 2193 Apple, Inc. © Foster Partners 2014www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Notes 1. 2. 3. 4. Legend Water/Fire Service Sanitary Sewer Gas Electrical Fiber Optic/Telecomm Storm Drainage Existing Water/Fire Service Existing Sanitary Sewer Existing Gas Existing Electrical Existing Fiber Optic/Telecomm Existing Storm Drainage Capacity of the existing utility systems at points of connection to be confirmed. Existing fire hydrants around site perimeter will remain in place as possible per site plan. New fire hydrants at site perimeter will tap off of city mains. 300 feet spacing between fire hydrants at site perimeter will be maintained. Internal fire hydrants will be tapped from the on-site fire service loops or mains. Fire hydrant final locations will be agreed with the fire department. Unless external agencies or site conditions require otherwise, vaults, boxes, etc. shall typically be flush to finish grade aligned and set parallel to adjacent joints, curbs, etc. North Tantau Avenue Site A Visitors Center & Parking N Apple Campus 2, Phase 1 N 01 04/20/2015 MDPlanning - Site & Arch. Review Resubmit 03 07/01/2015 Planning - Site Architectural Review MD S I T E - L a n d s c a p e Existing Tree Plan 01 P-VC-4.00 Existing Tree Plan 1"=30' (1:360) 1"=30' (1:360) 3195 Legend Existing Specimen Tree Existing Standard Tree 3194 3 3 0 4 3 3 0 6 3 3 0 7 3 3 0 9 3 3 1 1 3 3 1 2 3 3 1 3 3 3 1 4 3 3 1 5 3 3 1 7 3 3 1 8 3 3 1 9 3 3 2 1 3 3 2 3 3 3 2 4 3 3 2 5 3 4 3 6 3 4 3 7 3 4 3 8 3 4 3 9 3 4 4 0 3 4 4 1 3 4 4 2 3 4 4 3 3 4 4 4 3 4 4 5 3 4 4 6 3 4 4 7 3 4 4 8 3 4 4 9 3 4 5 0 3 4 5 1 3 4 5 2 3 4 5 3 3 4 5 4 3 4 5 5 3 4 5 6 3 4 5 7 3 4 5 8 3 4 5 9 3 4 6 0 3 4 6 1 3 4 6 2 3 4 6 3 3 4 6 4 3 4 6 5 3 4 6 6 3 4 6 7 3 4 6 8 3 4 6 9 3 4 7 0 3 4 7 1 3 4 7 2 3 4 7 3 3 4 7 4 3 4 7 5 3 4 7 6 3 4 7 7 3 4 7 8 3 4 7 9 3 4 8 0 3 4 8 1 3 4 8 2 3 4 8 3 3 4 8 4 3 4 8 5 3 4 8 6 3 4 8 7 3 4 8 8 3 4 8 9 3 4 9 0 3 4 9 1 3 4 9 2 3 4 9 3 3 4 9 4 3 4 9 5 3 4 9 6 3 4 9 7 3 4 9 8 3 4 9 9 3 5 0 0 3 5 0 1 3 5 0 2 3 5 0 3 3 5 0 4 3 5 0 5 3 5 0 6 3 5 0 7 3 5 0 8 3 5 0 9 3 5 1 0 3 5 1 1 3 5 1 2 3 5 1 3 3 5 1 4 3 5 1 5 3 5 1 6 3 5 1 7 3 5 1 8 3 5 1 9 3 5 2 0 3 5 2 1 3 5 2 2 3 5 2 3 3 5 2 4 3 5 2 5 3 5 2 6 3 5 2 7 3 5 2 8 3 5 2 9 3 5 3 0 3 5 3 1 3 5 3 2 3 5 3 3 3 5 3 4 3 5 3 5 3 5 3 6 3 5 3 7 3 5 3 8 3 5 3 9 3 5 4 0 3 5 4 1 3 5 4 2 3 5 4 3 3 5 4 4 3 5 4 5 3 5 4 6 3 5 4 7 3 5 4 8 3 5 4 9 STOP STOP STOP STOP STOP SLOW BUMP 35 35 STOP A C P A V E ME NT A C P AV EMEN T CONCRETE WALK C O N C R E T E WALK GR A S S GR A S S GR AS S G R A S S A C P AV E ME N T A C P A V E ME N T AC P AV EMEN T A C P A V E ME N T AC P A V EMENT A C P AV E ME N T A C P A V E ME N T CONCRETE CONCRETE CON C R ETE C ON CR E T E C O N C R E T E CONCRETE CONCRET E CON CRET E C O N C R E T E GA TE GR A S S GRAS S TE N T GR A S S GR AS S GR AS S GR A S S GR A S S A C P A V E ME NT A C P AV E ME N T S IGN S IG N S IGN P E D S IGN Ho s e B ib BUILD ING 4 6 T TE N T TE NT CON C R ET E C O N CR E T E C O N C R ET E LA N D S C AP E LAN D S C A P E C O N C R E T E LA N D S C A P E LAN D S C A P E LA N D S C A P E LA N D S C A P E GR A V E L GR A V E L DIR T C O N C R E T E LA N D S C A P E LA N D S C A P E LA N D S C AP E LA N D S CAP E LAN D S C A P E LA N D S C A P E LA N D S C AP E LAN D S C A P E LA N D S CAP E LAN D S C A P E C O N C R ETE S IGN C O N C R E T E GR A S S GR A S S LAN D S C A P E C ONC R E T E C O N C R ET E LAN D S C A P E LA N D S C AP E LAN D S C A P E LA N D S CAP E LAN D S C A P E LA N D S C AP E LAN D S C A P E GR A S S LA N D S C A P E A C P A V E M E N T AC P A V E MENT GR A S S GR AS S C O N C R ET E A S P HA LT AS P H A LT A S P HA LT A S P HA LT C ON C . C O N C . CO N C . AS P H A LT A S P HA LT GRAS S C O N C R E T E A S P HA LT GRAS S S IGN S IGN S IGN Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive 00 02/25/2015 00 02/25/2015 Planning - Site & Architectural Review MD 2193 Apple, Inc. Key Plan © Foster Partners 2014www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue North Tantau Avenue Site A Visitors Center & Parking N N Apple Campus 2, Phase 1 01 P-VC-4.09 Per EIR Entitlements October 2013 Tree Disposition Plan October 2013 Tree Disposition Plan 1"=30' (1:360) 1"=30' (1:360) 2 9 3 4 3 5 0 1 3 4 8 6 3 4 8 4 3 4 8 2 3 4 8 0 3 4 7 8 3 4 7 7 3 4 7 6 3 4 7 5 3 4 7 4 3 4 7 3 3 4 7 2 3 4 7 1 3 4 7 0 3 4 6 9 3 4 6 8 3 4 6 7 3 4 6 6 3 4 6 5 3 4 6 4 3 4 6 3 3 4 6 2 3 4 6 1 3 4 6 0 3 4 5 9 3 4 5 8 3 4 5 7 3 4 5 6 3 4 5 4 3 4 5 2 3 4 5 0 3 4 4 9 3 4 4 8 3 4 4 7 3 4 4 5 3 3 2 1 3 3 2 0 3 3 1 9 3 3 1 8 3 3 0 9 3 4 3 8 3 4 5 1 3 4 5 5 3 4 8 1 3 4 9 7 3 4 9 6 3 4 9 9 3 4 9 5 3 4 9 4 3 4 9 2 3 4 9 8 3 5 0 0 3 4 8 8 3 4 8 7 3 4 7 9 3 4 5 3 3 3 2 4 3 3 2 2 Building Visitor Center Parking Structure Visitor Center O N L Y ONLY ONLYONLY ONLY P3 P1P2 North Tantau Avenue N ort h T ant au A venu e P r u n e r id g e A v e n u e M a r - C o m m B u il d in g T a n t a u 1 4 3194 3195 3195 Legend 3194 3195 Standard Trees to Remain Specimen Trees to Remain Standard Trees to be Transplanted Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Specimen Tree To Remain Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Specimen Tree To Be Removed Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Specimen Tree To Be Transplanted Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Standard Tree To Remain Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Standard Tree to be Transplanted Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Standard Tree To Be Removed Phase 1 Site A - Tree Summary Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive 01 02/25/2015 00 02/25/2015 Planning - Site & Architectural Review MD 2193 Apple, Inc. © Foster Partners 2014www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue North Tantau Avenue Site A Visitors Center & Parking N Apple Campus 2, Phase 1 N 01 04/20/2015 MDPlanning - Site & Arch. Review Resubmit 01 P-VC-4.10 Proposed Tree Disposition Plan Proposed Tree Disposition Plan 1"=30' (1:360) 1"=30' (1:360) 2 9 3 4 3 5 0 1 3 4 8 6 3 4 8 4 3 4 8 2 3 4 8 0 3 4 7 8 3 4 7 7 3 4 7 6 3 4 7 5 3 4 7 4 3 4 7 3 3 4 7 2 3 4 7 1 3 4 7 0 3 4 6 9 3 4 6 8 3 4 6 7 3 4 6 6 3 4 6 5 3 4 6 4 3 4 6 3 3 4 6 2 3 4 6 1 3 4 6 0 3 4 5 9 3 4 5 8 3 4 5 7 3 4 5 6 3 4 5 4 3 4 5 2 3 4 5 0 3 4 4 9 3 4 4 8 3 4 4 7 3 4 4 5 3 3 2 1 3 3 2 0 3 3 1 9 3 3 1 8 3 4 3 8 3 4 5 1 3 4 5 5 3 4 8 1 3 4 9 7 3 4 9 6 3 4 9 9 3 4 9 5 3 4 9 4 3 4 9 2 3 4 9 8 3 5 0 0 3 4 8 8 3 4 8 7 3 4 7 9 3 4 5 3 3 3 2 4 3 3 2 2 Building Visitor Center Parking Structure Visitor Center O N L Y ONLY ONLYONLY ONLY P3 P1P2 North Tantau Avenue N ort h T ant au A venu e P r u n e r id g e A v e n u e M a r - C o m m B u il d in g T a n t a u 1 4 3194 3195 3195 Legend 3194 3195 3194 3194 3194 Quantity Standard Trees to Remain Specimen Trees to Remain 00 Trees Standard Trees to be Transplanted 0 Trees Specimen Trees to be Transplanted 0 Trees Standard Trees to Be Removed Specimen Trees to Be Removed 0 Trees Total Existing Trees Total Existing Trees to be Removed 105 Trees Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Specimen Tree To Remain Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Specimen Tree To Be Removed Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Specimen Tree To Be Transplanted Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Standard Tree To Remain Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Standard Tree to be Transplanted Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Standard Tree To Be Removed Per Site A Planning Submission - Feb 2015 Existing Standard/Specimen Tree To Remain Per Site A Planning Submission - Feb 2015 Existing Standard/Specimen Tree to be Transplanted Per Site A Planning Submission - Feb 2015 Existing Standard/Specimen Tree To Be Removed Phase 1 Site A - Tree Summary 51 Trees 54 Trees 54 Trees changed since original EIR approval *Tree disposition plan for Site A has not Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive 01 02/25/2015 00 02/25/2015 Planning - Site & Architectural Review MD 2193 Apple, Inc. © Foster Partners 2014www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue North Tantau Avenue Site A Visitors Center & Parking N Apple Campus 2, Phase 1 N 01 04/20/2015 MDPlanning - Site & Arch. Review Resubmit 01 Tree Disposition Plan - North Tree Disposition Plan - North Overall Project Apple Campus 2 P-VC-4.15 N 1"=100' (1:1200) 1"=100' (1:1200) 1824 1836 1721 1720 2934 1439 1438 3016 2805 1302 1300 1212 1408 1023 1024 1027 1034 1038 1039 1040 1043 1045 1046 1098 1100 1112 1118 1459 1460 1461 1471 1478 1480 1509 1510 1511 1512 1513 1846 2042 2048 2050 2051 285428552856 2857 2858 2868 28692870 2871 2872 2873 2880 2881 2899 29002901 2904 2916 2917 2919 2923 2924 2926 2927 2928 3067 3068 3069 3195 3196 3621 5506 5505 5502 5500 5499 5498 5497 5495 5494 5493 5492 5490 5489 5488 5486 5485 5484 5482 5481 5479 5478 5477 5475 54745473 5471 5470 5469 5468 5466 5465 5464 5462 5461 5459 5458 5457 5455 5454 5453 5451 5450 5448 5447 5446 5445 5444 5443 5442 5441 5440 5439 5435 5434 5433 5432 5431 5430 5427 54255424 5422 5421 5419 5418 5417 5416 5414 5413 5411 5410 54085407 5406 5405 5403 5400 5398 5396 5394 5393 5392 5391 5390 5389 5388 5387 5386 5385 5384 5383 5382 5381 5380 5379 5378 5377 5376 5375 5374 5373 5372 5371 5370 5369 5368 5352 5351 5350 5349 5348 5347 5346 5345 5344 5343 5342 5341 5340 5339 5338 5337 5336 5335 5334 5333 5332 5331 5330 5329 5328 5327 5326 5325 5324 5323 5322 5321 5320 5319 5318 5317 5316 5315 5314 5313 5312 5311 5310 5309 5308 5307 5306 5305 5304 5303 5302 5301 5300 5299 5298 5297 5296 5295 5294 5293 5292 5291 5290 5289 5288 5287 5286 5285 5284 5282 5281 5279 5278 5276 5275 5274 3665 3664 3663 3662 3661 3660 3659 3658 3657 3656 3655 3654 3620 3501 3486 3484 3482 3480 3478 3477 3476 3475 3474 3473 3472 3471 3470 3469 3468 3467 34663465 34643463 34623461 3460 3459 3458 3457 3456 3454 3452 3450 3449 3448 3447 3445 3424 3423 3416 3415 3414 3413 3411 3410 3407 3406 3404 3402 3399 3398 33973396 3395 3394 3367 3321 3320 3319 3318 3310 3309 3308 3097 3095 3093 3091 3089 3088 30873086 3085 3084 3083 3082 3081 3080 3079 3078 3077 3076 3075 3074 3073 3072 3071 3070 3065 3064 3063 3062 3061 3059 3053 3052 3051 3050 3049 3047 3046 3041 3039 3038 3037 3036 3035 3034 3033 3032 3027 3026 3025 3024 3023 3022 3021 3020 3019 3018 3017 3015 3014 3013 3012 3011 3010 3004 3003 3002 3001 3000 2999 2998 2994 2992 2987 2983 2977 2974 2719 1148 3057 3045 2092 3031 3029 3028 3008 3009 3007 3006 3005 2957 2956 2955 2953 2952 1151 27181152 2988 3438 3451 3455 3481 3497 3496 3499 3405 3400 34013403 5501 5503 5504 5496 5491 5487 5483 5480 5472 5476 5467 5463 5456 5460 5452 5449 5438 5437 5436 5428 5429 5426 5423 5420 5415 5412 5409 5404 5402 5397 5399 5395 2273 2274 2275 1332 1413 14141437 1436 2935 2936 1854 1825 1823 1837 1722 2879 2146 2214 2230 1210 1153 1091 3173 1425 1424 1423 1325 2821 2766 2761 2760 3495 3494 3492 3498 3500 3488 3487 3479 3453 3324 3322 11491150 2954 3425 3426 3427 3428 3429 3430 3431 3432 4333 3434 4355 31753174 3176 3139 3141 3060 3058 3048 3040 3054 1154 2762 2993 1084 2771 2809 2808 2807 2806 2145 2147 2991 1001 1004 1005 1006 1008 1009 1010 1011 1012 1013 1014 1015 1016 1017 1020 1028 1030 1035 1041 1042 1044 1047 1048 1049 1050 1051 1053 1054 1055 1056 1057 1058 1059 1060 1061 1062 1063 1064 1065 1066 1067 1068 1069 107010711072 1073 1074 1075 1077 1078 1079 1080 1081 1082 1083 1084 1085 1086 1087 1088 1089 1090 1091 1092 1093 1094 10951096 1097 10991101 1102 1104 1106 1109 1110 1111 1113 1120 1125 1127 1128 1129 1130 1131 1132 1135 1137 1140 11411142 1143 1144 1145 1146 1147 1148 1149 1150 1151 11531155 1156 1157115811601161 1162 1163 1164 1165 1166 1167 1168 1169 1170 1171 1172 1173 1174 1175 1176 1177 1178 1179 1180 1181 1182 1183 1185 1186 1188 1190 1192 1193 1194 1196 1197 1198 1199 1200 1201 1202 1203 1204 1205 1206 1207 1208 1209 1210 1211 1212 12131214 1215 1216 1217 1218 1219 1220 1221 1222 1223 1224 1225 1226 1227 1228 1229 12301231 1232 1233 1234 1235 1236 1237 1238 1239 1240 1241 1242 1243 1244 1245 1246 12471248 1249 1250 1251 1252 1253 1254 1255 1256 1257 1258 1259 1260 1261 1262126312641265 12661267 1268 1269 1270 1271 1272 1273 1274 1275 1276 1277 1278 1279 1280 1281 1282 1283 1285 1286 1287 1289 1290 1291 1292 1293 1294 1295 1296 1298 1299 1300 1301 1302 1303 1304 1306 1307 1308 1312 1313 1314 1315 1317 1318 13191320 1321 1323 1325 1326 1327 1328 1329 1330 1331 1332 1333 1334 1335 1336 1337 1338 1339 1340 1341 1342 1343 1344 1345 1346 1347 1348 1349 1350 1351 1352 1353 135413551356 1357 1358 1359 1360 1361 1362 1363 1364 1365 1366 1367 1368 1369 1370 1371 1372 1373 1374 13751376 1377 1378 1379 1380 1381 1382 1383 1384 1385 1386 1387 1388 1389 1390 139113921393 1394 1395 1396 1397 1398 1399 1400 1401 1402 1403 1404 1405 1406 1407 1409 141014111412 1413 1414 1415 1416 1417 1418 1419 1420 1421 1422 1423 1425 1427 1428 1429 1430 1431 1432 1433 1434 1435 1436 1437 1438 1439 14401441 1442 1443 1444 1445 1446 1447 144814491450 1451 1452 1453 1454 14551456 14571458 1462 1463 1464 1465 1466 1467 1468 1469 1470 1472 1473 1474 1475 14761477 1479 1482 1483 14841485 1486 1487 1488 1489 1490 14911492 1493 1494 1495 1496 1497 1498 1499 1500 1501 1502 1503 1504 1506 1507 1514 1515 1516 1517 1518 1519 1520 1521 1522 1523 1524 1525 1526 1527 1528 1529 1531 1532 1533 1534 1535 1536 1537 1538 1539 1540 1541 1542 1543 1544 1545 1546 1547 1548 1549 1550 1551 1552 1553 1554 1555 1556 1557 1558 1559 1560 1561 1562 1563 1564 1565 1566 1567 1568 1569 1570 1571 1572 15731574 1575 1576 1577 1578 1579 1580 1581 1582 1583 1584 1585 1586 1587 1588 1589 1590 1591 1592 1593 1594 1595 1596 1597 1598 1599 1600 1601 1602 1603 1604 1605 1606 1607 1608 1609 1610 1611 1612 1613 1614 1615 1616 1617 1618 1619 1620 1621 1622 1623 1624 1625 1626 1627 1628 1629 1630 1631 1632 1633 1634 1635 16361637 1638 1639 1640 1641 1642 1643 1644 1645 1646 1647 1648 1649 1650 1651 1652 1653 1654 1655 1656 1657 1658 1659 1660 1661 1662 1663 1664 1665 1666 1667 1668 16691670 1671 1672 1673 1674 1675 1676 1677 1678 1679 1680 1681 1682 1683 1684 1685 1686 1687 1688 1689 1690 1691 1692 1693 1694 1695 1696 1697 1698 1699 1700 1701 1702 1703 1704 1705 1706 1707 1708 1709 1710 1711 1712 1713 1714 1715 1716 1717 1718 1719 1720 1721 1722 1723 1724 17251726 1727 1728 1729 1730 1731 1732 1733 1734 1735 1736 1737 1738 1739 1740 1741 17421743 1744 1745 1746 1747 1748 1749 1750 1751 1752 1753 1754 1755 1756 1757 1758 1759 1760 1761 1762 17631765 1768 1771 1772 1773177417751776 17771778 1779 1780 1781 1782 1783 1784 1785 1786 1787 1788 1789 1790 1791 1792 1793 1794 1795 1796 1797 1798 1799 1800 1801 1802 1803 1804 1805 1806 1807 1808 1809 1810 1811 1812 1813 1814 1815 1816 1817 1818 1819 1820 1821 1822 1823 1824 1825 1826 1827 1829 1831 1833 1834 1835 1836 1837 1838 1839 1840 1841 1842 1843 1844 1845 1848 1851 1852 1853 1854 1855 1856 1857 1858 1859 1860 1861 1862 1863 1864 1865 1866 1868 1869 1870 1871 1872 1873 1874 1875 1876 1877 1878 1879 1880 1881 1882 1883 1884 1885 1886 1887 1888 1889 1890 1891 1892 1893 1894 1895 1896 1897 1898 1899 1900 1901 1902 1903 1904 1905 1906 1907 1908 1909 1910 1911 1912 1913 1914 1915 1916 1917 1918 1919 1920 1921 1922 1923 1924 1925 1926 1927 1928 1929 1930 1931 1932 1933 1934 1935 1936 1937 1938 1939 1940 1941 1942 1943 1944 1945 1946 1947 1948 1949 1950 1951 1952 1953 1954 1955 1956 1957 1958 1959 1960 1961 1962 1963 1964 1965 1966 1967 1968 1969 1970 1971 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2008 2010 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2043 2044 2045 2046 2052 2053 205520562058 2059 2060 2061 2062 2063 2064 2065 2066 2068 2069 2070 2071 2073 2074 2075 2076 2077 2078 2079 2080 2082 2083 2084 2085 2086 2087 2088 2089 2090 2091 2092 2093 2094 2095 2096 2097 2098 2099 2100 2101 2102 2103 2104 2106 2107 2110 2111 2112 2113 2115 2116 2117 2118 2119 2120 2122 2124 2125 2126 2127 2128 2129 2130 2131 2132 2135 2136 2137 2138 2139 2140 2141 2142 2143 2144 2145 2146 2147 2148 2149 2150 2151 2152 2153 2154 2155 2156 2157 2158 2161 2162 2163 2164 2165 2166 2167 2168 2169 2170 2171 2172 2173 2175 2177 2178 2179 2183 2185 2186 2187 2188 2189 2190 2191 2193 21952196 2198 2199 2200 2201 2202 2203 2204 2205 2206 2207 2208 2209 2210 2211 2212 2213 2214 2216 221822202222 2223 2224 2225 2226 2227 2228 2229 2230 2231 2233 2234 2235 2236 22372239224122432245 2246 2247 2250 2251 2252 2253 2254 2255 2256 22572258 2260226222642266 2267 2268 2269 2270 2271 2272 2273 2275 2276 2277 2278 2279 2280 2281 2282 2283 2284 2285 2286 2287 2288 2289 2290 2291 2292 2293 2294 2295 2296 2297 2298 2299 2300 2301 2302 2303 2304 2307 2308 2310 2311 2312 2313 2314 2315 2316 2317 2318 2319 23202321 2322 2323 2324 2325 2326 2327 2328 2329 2330 2331 2332 2333 2334 2335 2336 2337 2338 2340 2342 2344 2345 2346 2347 2348 2349 23502351 2352 23532354 23552356 23572358 2359 2360 2361 2362 2363 2364 2366 2367 2369 2371 2372 2375 2376 2378 2379 2382 2383 2386 2387 2388 2390 2391 2393 2396 2397 2398 2399 2400 2401 2402 2403 2404 2405 24062407 2408 2409 2410 2411 2412 2413 2414 2415 2416 2417 2418 2419 2420 2421 2422 2423 2424 2425 2426 2427 2428 2429 2430 2431 2432 2433 2434 2435 2436 2437 2438 2439 2440 2441 2443 2444 2449 2450 24522454 2456 2457 2458 2459 2460 2461 2462 2463 2464 2465 2466 2467 2468 2469 2470 2471 2472 2473 2474 2475 2476 24802487 2488 2491 2492 24942495 2497 2499 2500 2501 25082509 2511 2514 2516 2517 2519 2520 2521 2523 2526 2528 2531 2533 2534 2536 2537 2539 2540 2541 2542 2543 2544 2545 2546 2547 2548 2549 2550 25512552 25542555 2557 2558 25602562 2564 2565 2567 2569 2570 2572 2573 2576 2577 2578 2579 2580 2581 2583 2584 2586 2587 2588 25892590 2591 2592 2593 2600 2601 2602 2603 2604 2605 2606 2607 2608 2609 2610 2611 2612 2613 2614 2615 2616 2617 2618 2619 2620 2621 2622 2623 2624 2625 2626 2627 2628 2629 2630 263126322633 2634 2635 2636 2637 2638 2639 2640 2641 2642 2643 2644 2645 2646 2647 2648 2649 2650 2651 2652 2653 2654 2655 2656 2657 2658 2659 266026622663 2664 2665 266626672668267026712672 2673 2674 2675 2676 2677 2678 2679 2680 2681 2682 2683 2684 2685 2686 268726882689 2690 2691 2692 2693 2694 2695 2699 2702 2703 2704 2706 2707 2708 2709 2711 2712 2714 2716 2717 2719 2720 2721 2722 2723 2724 2725 2726 2727 2730 27342735 2738 2739 2741 2742 2743 27472748 2749 2750 2751 2752 2754 2756 2757 2759 2761276327642765 2767 2768 2769 2770 2771 2772 2773 2774 2775 2776 2777 2779 2781 2782 2783 2785 2786 2787 2788 2789 2792 2794 2796 27972799 2801 2802 2803 2804 2805 2806 2807 2808 2809 2810 2811 2812 2815 2817 2818 2819 2820 2821 2824 2825 2826 2830 2831 2832 2833 2834 2837 2838 2839 2840 2841 2842 2843 2844 284728482849 2850 28602861 2862 2863 286428652867 2875 28762878 2879 2882 2883 2884 2885 2886 2887 2889 2890 2891 2892 2895 2896 2897 2898 2902 2903 2906 2907 2908 2909 2910 2912 2913 2915 2918 2921 2922 2932 2933 2934 2935 2936 2937 2938 2939 2940 2941 2943 2944 2945 2946 2947 2948 2949 2951 2952 2953 2954 2955 2956 2957 2958 2959 2960 2961 2962 2963 2964 2965 2966 2968 2969 2970 2971 2975 2976 2978 2979 2980 2981 2982 2983 2984 2986 2989 2990 2992 29932994 2995 2996 2997 2998 2999 3000 3001 3002 3003 3004 3005 3006 3007 3008 30093010 3011 30123014 30153016 30173019 3021 3022 3023 3024 3025 3026 3027 3028 3030 3031 3032 3033 3034 3035 3036 3037 3038 3039 3040 3042 30433044 3045 3046 3047 3048 3049 3050 3051 3052 3053 3054 30553056 3057 3058 3059 3060 3061 3062 3063 3064 3065 3066 3070 3071 3072 3073 3074 3075 3076 3077 3078 3079 3080 3081 3082 3083 3084 3085 3086 3087 3088 3089 3090 30913092 3093 3094 3095 3096 3097 3098 3099 3100 3101 3102 3103 3104 3105 3106 3107 3108 3109 3110 3111 3112 3113 3114 3115 3116 3117 3118 3119 3120 3121 3122 3123 3124 3125 3126 3128 3130 3131 3132 3133 3134 31363137 3138 31393140 3141 3142 3143 3144 3145 3146 3147 3148 3149 3150 3151 3152 3153 3154 3155 3156 3157 3158 3159 3160 3161 3164 3165 31663167 3168 3169 3170 3171 3172 3173 3174 3175 3176 31773178 3179 3180 3181 3182 3183 3184 3185 3186 3187 3188 3189 3190 3191 3192 3193 3194 3197 3198 3199 3200 3201 3202 3203 3204 3205 3206 3207 3208 3209 3210 3211 3212 3213 3214 3215 3216 3217 3218 3219 3222 3223 3224 3225 3226 3227 3228 3229 3230 3231 3232 3233 3234 3235 3237 3239 3240 3241 3242 3245 3265 3279 3280 3281 328232833285 3286 32883289 3290 3291 3292 3293 3294 3295 3296 3297 3298 3299 3300 3301 3302 3303 3304 3305 3306 3307 3308 3309 3310 3311 3312 3313 3314 33153316 3317 3318 3319 3321 3323 3324 3325 3328 3329 3330 33313332 3333 3334 3335 3337 3342 3343 3344 3345 3346 3347 3348 3349 3350 3351 3352 3353 3354 3356 3357 3358 3359 3360 3361 3362 3363 3364 3365 3366 3367 3368 3370 3371 3372 3373 3374 3375 3377 3379 3380 3381 3382 3383 3385 3386 3387 3388 3389 3390 3391 3392 3393 3394 3395 3396 3397 3398 3399 34003401 3402 3403 3404 3405 3406 3407 3408 3409 3410 3411 3413 3414 3415 3416 3422 3423 3424 3425 3426 3427 3428 3429 3430 3431 3432 3433 3434 3435 3436 3437 3438 3439 3440 3441 3442 3443 3444 3445 3446 3447 3448 3449 34503451 3452 3453 3454 3455 3456 3457 3458 3459 3460 3461 3462 3463 3464 3465 3466 3467 3468 3469 3470 3471 3472 3473 3474 3475 3476 3477 3478 3479 3480 3481 3482 3483 3484 3485 3486 3487 3488 3489 3490 3491 3492 3493 3494 3495 3496 3497 3498 3499 3500 3501 35023503 35043505 35063507 3508 3509 3510 3511 3512 3513 3514 3515 3516 3517 3518 3519 35203521 3522 3523 3524 3525 3526 3527 3528 3529 3530 3531 3532 3533 3534 3535 3536 3537 3538 3539 3540 3541 3542 3543 3544 3545 3546 3547 3548 3549 3619 3620 3622 3623 3624 3625 3626 3627 3628 3629 3630 3631 36403641 3642 3643 3644 3654 3655 3656 3657 3658 3659 3660 3661 3662 3663 3664 3665 3667 3668 3669 3670 3671 B u il d in g V i s it o r C e n t e r P a r k in g S t r u c t u r e V is i t o r C e n t e r 15.42' E Homestead Rd 25 STOP STOP STOP STOPST OP STOP 25 ON LY ON LY ONLY ONLY ONLY ONLY ONLY ONLY O N L Y O N LY O N L Y O N LY ONLY O N LY O N LY ON LY ONLYONLY ONLY ONLY ONLY ONLYONLY ONLY ONLY ONLY HC HC HC HC HC HCHC X X X X X X STOP P3 P1 P2 N o r t h T a n t a u A v e n u e N o rth T a n ta u A v e nu e N o r t h T a n t a u A v e n u e N o r t h T a n t a u A v e n u e N o r t h W o lf e R o a d N o r t h W o lf e R o a d N o r t h W o lf e R o a d N o r t h W o lf e R o a d N o r t h W o lf e R o a d East Homestead Road East Homestead Road East Homestead Road East Homestead Road North Wolfe Road P run e ridg e A v e n u e Prun eridg e Avenu e Pruneridge Avenue N ig h t i n g a l e R o a d P e a c o c k A v e n u e Q u a il A v e n u e A v e n u e N o r t h T a n t a u East Homestead Road East Homestead Road N o r t h W o lf e R o a d N o r t h W o lf e R o a d East Homestead Road Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive 01 02/25/2015 00 02/25/2015 Planning - Site & Architectural Review MD 2193 Apple, Inc. © Foster Partners 2014www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue North Tantau Avenue Site A Visitors Center & Parking Apple Campus 2, Phase 1 01 04/20/2015 MDPlanning - Site & Arch. Review Resubmit 3194 3195 3195 Legend 3194 3195 3194 3194 3194 Standard Trees to Remain 781 Trees Specimen Trees to Remain 01 Trees Standard Trees to be Transplanted 81 Trees Specimen Trees to be Transplanted 18 Trees Standard Trees to Be Removed 3,576 Trees Specimen Trees to Be Removed 49 Trees Total Existing Trees 4,506 Trees Total Existing Trees to be Removed 3,625 Trees Summary AC2 Overall Project Tree Quantity Total 624 Trees 0 Trees 75 Trees 18 Trees 3,264 Trees 49 Trees 4,030 Trees 3,313 Trees 0 Trees 0 Trees 0 Trees 0 Trees Quantity Site B Phase 2 - 21 Trees 48 Trees 69 Trees 48 Trees 1 Trees 6 Trees 0 Trees 0 Trees Quantity Site C+D Phase 2 - 136 Trees 264 Trees 407 Trees 264 Trees Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Specimen Tree To Remain Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Specimen Tree To Be Removed Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Specimen Tree To Be Transplanted Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Standard Tree To Remain Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Standard Tree to be Transplanted Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Standard Tree To Be Removed Per Site A Planning Submission - Feb 2015 Existing Standard/Specimen Tree To Remain Per Site A Planning Submission - Feb 2015 Existing Standard/Specimen Tree to be Transplanted Per Site A Planning Submission - Feb 2015 Existing Standard/Specimen Tree To Be Removed 0 Trees 0 Trees 0 Trees 0 Trees Quantity Site A Phase 1 - 51 Trees 54 Trees 54 Trees Site A) (including Quantity Phase 1 105 Trees Tree Disposition Plan - South Overall Project Apple Campus 2 P-VC-4.16 N Tree Disposition Plan - South 1":100' (1:1200)01 1"=100' (1:1200) 4015 4016 4017 4828 5273 5212 5211 5204 5203 5202 5201 5200 5199 5198 5190 5188 5187 5186 5185 5184 5181 5180 5179 5178 5177 5171 5170 5169 5153 5152 5151 5150 5149 5148 5147 5146 5145 5144 5143 5142 5141 5140 5139 5138 5137 5136 5135 5134 5133 5132 5131 5130 5129 5128 5127 5126 5118 5117 5116 5115 5114 5113 5112 5111 5110 5109 5108 5107 5106 5105 5104 5103 5102 5101 5100 5099 5098 5097 5096 5095 5094 5093 5092 5091 5090 5089 5088 5087 5086 5085 5084 5083 5082 5081 5080 5079 5078 5077 5076 5075 5074 5073 5072 5071 5070 5069 5068 5067 5066 5065 5064 5063 5062 5061 5060 5059 5058 5057 5056 5055 5054 5050 5049 5048 4934 4932 4931 4930 4929 4928 4927 4926 4917 4915 4756 4732 4731 4730 4729 4726 4281 4280 4279 4278 4277 4276 4275 4274 4271 4270 4268 4267 4266 4265 4264 4263 4262 4261 4259 4258 4257 4256 4255 4254 4253 4252 4246 4244 42434242 4241 4240 4237 4236 4235 4234 4233 4226 4225 4224 4223 4222 4221 4220 4218 4217 4216 4215 4214 4212 4211 4210 4209 4204 4203 4202 4201 4194 4193 4192 4191 4190 4188 4187 4186 4185 4183 4073 4072 4071 4070 4069 4065 4063 4062 4060 4056 4055 4054 4048 4047 4046 3782 3781 3780 3779 3778 3777 3776 3775 3774 3773 3772 3771 3770 3769 3768 3767 3764 3763 3762 3761 3760 3759 3758 3757 3756 3754 3753 3752 3751 3750 3749 3748 3747 3746 3745 3744 37433742 3741 3740 3739 3738 3737 3736 3735 3734 3733 3732 3731 3730 3729 3728 3727 3725 3724 3723 3722 3721 3720 3714 3713 3712 3711 3710 3709 3707 3665 3654 3653 3652 3651 3650 3649 3648 3647 3646 3605 3601 3596 3589 3587 3584 3582 3576 3561 3424 3423 3419 3418 3417 3416 3415 3414 3413 3412 3411 4834 4665 4664 4663 3604 3603 3602 3600 3599 3598 3597 3593 3592 3591 3590 3588 3583 3581 3580 3579 3575 3572 3571 3570 3569 3568 3567 3565 3564 3563 3562 3560 3559 3558 466046854676 4704 4692 5260 4245 4272 4273 35523551 4551 4659 5051 4250 4249 4248 4247 4200 4199 4198 3726 3755 3944 3945 3946 45063902 3927 3926 3672 3784 3708 5122 5123 5235 5234 5233 5232 5231 5228 5227 5263 4205 4213 4789 4801 3904 5173 5172 5262 5214 5216 2637 2638 2639 2640 2641 2642 2643 2644 2645 2646 2647 2648 2650 2653 2659 266026622663 2664 2665 266626672668 2669 267026712672 2673 2674 26933234 3235 3237 3239 3240 3241 3242 3243 3244 3245 3246 3247 3248 3249 3250 3251 3252 3253 3254 3255 3257 3260 3261 3265 3266 32693270 3271 3272 3273 3274 3275 327732783279 3290 3291 3292 3293 3294 3295 3411 3412 3413 3414 3415 3416 3417 3418 3419 3420 3421 3422 3423 3424 3550 3551 3552 3553 3554 3555 3556 3557 3566 35733574 35773578 3585 3586 3594 3595 3606 3607 3608 3609 3610 3611 3612 3613 3614 3615 3616 3617 3618 3628 3629 3630 3631 3632 36333634 3635 3636 3637 3638 3639 36403641 3642 3644 36453646 3647 3648 3649 3650 3651 3652 3653 3654 3665 3666 3667 3668 3669 3672 3673 3674 3675 3676 3677 3678 3679 3680 3681 3682 3683 3684 3685 3686 3687 3688 3689 3690 3691 3692 3693 3694 3695 3696 3697 3698 3699 3700 3701 3702 3703 3704 3706 3709 3711 3712 3713 3714 3715 3716 37173718 3719 3720 37213722 37233724 37253726 37273728 37293730 37313732 37333734 37353736 37373738 37393740 3741 3742 3743 3744 3745 3746 37473748 3749 3750 3751 3752 3753 3754 3755 3756 3757 3758 37593760 37613762 3764 3765 3766 3767 3768 3769 3770 3771 3772 3773 3774 3775 3776 3777 3778 3779 3780 3781 3782 3783 3784 3785 3786 3787 3788 3789 3790 3791 3792 3793 3794 3795 3796 3797 3798 3799 3800 3801 3802 3803 3804 3805 3806 3807 3808 3809 3810 3811 3812 3813 3814 3815 3816 3817 3818 3819 3820 3821 3822 3823 3824 3825 3826 3827 3828 3829 3830 3831 3832 3833 3834 3835 3836 3837 3838 3839 3840 3841 3842 3843 3844 3845 3846 3847 3848 3849 3850 3851 3852 3853 3854 3855 3856 3857 3858 3859 3860 3861 3862 3863 3864 3865 3866 3867 3868 3871 3872 3873 3874 3875 3876 3877 3878 3879 3880 3881 3882 3883 3884 3885 3886 3887 3888 3889 3890 3891 3892 3893 3894 3895 3896 3897 3898 3899 3900 3901 3902 3903 3904 3905 3906390739083909 3910 3911 3912 3913 3914 3915 3916 3917 3918 3919 3920 3921 3922 3923 3924 3925 3926 3927 3928 3929 3930 3931 3932 3933 3934 39353936 3937 3938 3939 3940 3941 3942 3943 3944 3945 3946 3947 3948 3949 3950 3951 3952 3953 3954 3955 3956 3957 39583959 3960 3961 3962 3963 3964 3965 3966 3967 3968 3969 3970 3971 3972 3973 39743975 3976 3977 3978 3979 3980 3981 3982 3983 3984 3985 3986 3987 3988 3989 3990 3991 3992 3993 3994 3995 3996 3997 3998 3999 4000 4001 4002 4003 4004 4005 4006 4007 4008 4009 4010 40114012 4014 4018 4019 4020 4021 4022 4023 4024 4025 4026 4027 4028 4029 4030 4031 4032 4033 4034 4035 4036 4037 4038 40394040 4041 4042 4043 4044 4045 4046 4047 4048 4049 4050 4051 4052 4053 4054 4055 4056 4057 4058 4059 4060 4061 4062 4063 40644065 4066 40674068 4069 4070 4071 4072 4073 4074 4075 4076 4077 4078 4079 4080 4081 4082 4083 4084 4085 4086 4087 4088 4089 4090 4091 4092 4093 4094 4095 4096 4097 4098 4099 4100 4101 4102 4103 4104 4105 4106 4107 4108 4109 4110 4111 4112 4113 4114 4115 4116 4117 4118 4119 4120 4121 4122 4123 4124 4125 4126 4127 4128 4129 4130 4131 4132 4133 4134 4135 4136 4137 4138 4139 4140 4141 4142 4143 4144 4145 4146 4147 4148 4149 4150 4151 4153 4154 4155 4156 4157 4158 4159 4160 4161 4162 4163 4166 4168 4169 4170 4171 4172 4173 4174 4175 4176 4177 4178 4179 4180 4181 4182 4183 4184 4185 4186 4187 4188 4189 4190 4191 4192 4193 4194 4195 4196 4197 4198 4199 4200 4201 4202 4203 4204 4205 4206 4207 4208 4209 4210 4211 4212 4213 4214 4215 4216 4217 4218 4219 4220 4221 4222 4223 4224 4225 4226 4227 4228 4229 4230 4231 4232 4233 4234 4235 4236 4237 4238 4239 4240 4241 4242 4243 4244 4245 4246 4247 4248 4249 4250 4251 4252 4253 4254 4255 4256 4257 4258 4259 4260 4261 4262 4263 4264 4265 4266 4267 42684269 4270 4271 4272 4273 4274 4275 4276 4277 4278 4279 4280 4281 4282 4283 4284 4285 4286 4287 4291 4292 4293 4294 4295 4296 4297 4298 4299 4300 4301 4302 4303 4304 4305 4306 4307 4308 4309 4310 4311 4312 4313 4314 4315 4316 4317 4318 4319 4320 4321 4322 4323 4324 4325 4326 4327 4328 4329 4330 4331 4332 4333 4334 4335 4336 43374338 4339 4340 4341 4342 4343 4344 4345 4346 4347 4348 4349 4350 4351 4352 4353 4354 4355 4356 43574358 4359 4360 4361 4362 4363 4364 4365 4366 4367 4368 4369 4370 4371 4372 4373 4374 4375 4376 4377 4378 4379 4380 4381 4382 4383 4384 4385 4386 4387 4388 4389 4390 4391 4392 4393 4394 4396 4397 4398 4399 4400 4401 4402 4403 4404 4405 4406 4407 4408 4409 4410 4411 4412 4413 4414 4415 4416 4417 4418 4419 4420 4421 4422 4423 4424 4425 4426 4427 4428 4429 4430 4431 4432 4433 4434 4435 4436 4437 4438 4439 4440 4441 4442 4443 4444 4445 4446 4447 4448 4449 4450 4451 4452 4453 4454 4455 4456 4457 4458 4459 4460 4461 4462 4463 4464 4465 4466 4467 4468 4469 4470 4471 4472 4473 4474 4475 4476 4477 4478 4479 4480 4481 4482 4483 4484 4485 4486 4487 4488 4489 4490 4491 4492 4493 4494 4495 4496 4497 4498 4499 4500 4501 4502 4503 45044505 4506 4507 4508 4509 4510 4511 4512 4513 4514 4515 4516 4517 4518 4519 4520 4521 4522 4523 4524 4525 4526 4527 452845294530 4531 4532 4533 4534 4535 4536 4537 4538 4539 4540 4541 4542 4543 4544 4545 4546 4547 4550 4551 4552 4553 4554 4555 4556 4557 4558 4559 4560 45614562 456345644565 45664567456845694570457145724573 4574 4575 4576 4577 4578 4579 4580 4581 4582 4583 4584 4585 4586 4587 4588 4589 4590 4591 4592 4593 4594 4595 4596 4597 4598 4599 4600 4601 4602 4603 4604 4605 4606 4607460846094610 4611 4612 4613461446154616461746184619 4620 4621 4622 4623 4624 4625 4626 4627 4628 4629 4630 4631 46324633 4634 4635 4636 4637 4638 4639 4640 4641 4642 4643 4644 4645 4646 4647 4648 4649 4650 4651 4652 4653 4654 4655 4656 4657 4658 4659 4660 4661 4662 4663 46644665 4666 4667 4668 4669 4670 4671 4672 4673 4674 4675 4676 4677 4678 4679 4680 4681 4682 4683 4684 4685 4686 4687 4688 4689 4690 4691 4692 4693 46944695 4696 4697 4698 46994700 4701 4702 47034704 4705 4706 4707 4708 4709 4710 4711 4713 4714 4715 4716 4717 4718 4719 4720 4721 4722 4723 4724 4725 4726 4727 4728 4729 4730 4731 4732 4733 4734 4735 4736 4737 4738 4739 4740 4741 47424743 4744 4745 4746 4747 4748 4749 4750 4751 4752 4753 4754 4755 4756 47574758 47594760 4761 47624766 4767 4768 4769 4770 4771 477247734774 4775 4776 4778 4782 4783 4784 4785 4786 4787 4788 4789 4790 4791 4792 4793 4794 4795 4796 4797 4798 4799 4800 4801 4802 4803 4804 4805 4806 4807 4808 4809 4810 4811 4812 4813 4814 4815 4816 4817 4818 4819 4820 4821 4822 4823 4824 4825 4826 4827 4829 4830 4831 4832 4833 4834 4835 4836 4837 48384839 4840 4841 4842 4843 4844 4845 4846 484748484850 4851 48544855 4856 4857 4859 48604861 4862 4863 4864 4865 4866 4867 4868 4869 4870 4871 4872 48744875 4876 4880 4881 4882 4883 4884 4885 4886 4887 4890 4891 4892 4893 4894 4895 4896 4897 4898 4899 4900 4901 4902 4903 4904 4905 4906 4907 4908 4909 4910 4911 4912 4913 4914 4915 4916 4917 4918 4919 4920 4921 4922 4923 4924 4925 4926 4927 4928 4929 4930 4931 4932 4933 4934 4935 4936 4937 4938 4939 4940 4941 4942 4943 4944 4945 4946 4947 4948 4949 4950 4951 4952 4953 4954 4955 4956 4957 4958 4959 4960 4961 4962 4963 4964 4965 4966 4967 4968 4969 4970 4971 4972 4973 4974 4975 4976 4977 4978 4979 4980 4981 4982 4983 4984 4985 4986 4987 4988 4989 4990 4991 4992 4993 4994 4995 4996 4997 4998 4999 5000 5001 5002 5003 5004 5005 5006 5007 5008 5010 5011 5013 5015 5016 5017 5018 5019 50205021 5022 5023 5024 5025 5026 5027 5028 5029 5030 5031 5032 5033 5034 5035 5036 50375038 5039 5040 5041 5042 5043 5044 5045 5046 5047 5048 5049 5050 5051 5052 5053 5054 5055 5056 5057 5058 5059 5060 5061 5062 5063 5064 5065 5066 5067 5068 5069 5070 5071 5072 5073 5074 5075 5076 5077 5078 5079 5080 5081 5082 5083 5084 5085 5086 5087 5088 5089 5090 5091 5092 5093 5094 5095 5096 5097 5098 5099 5100 5101 5102 5103 5104 5105 5106 5107 5108 5109 5110 5111 5112 5114 5116 51175118 5119 5120 5121 5122 5123 5124 5125 5126 5127 5128 5129 5130 5131 5132 5133 5134 5135 5136 5137 5138 5139 5140 5141 5142 5143 5144 5145 5146 5147 5148 5149 5150 5151 5152 5153 5156 515751585159 5160 5161 5162 5163 5166 5169 5171 5172 5173 5174 5175 5176 5177 5178 5179 5180 5181 5182 5183 5184 51855186 5187 5188 5189 5190 5191 5192 5193 5194 5195 5196 5197 5198 5199 5200 5201 5202 5203 5204 52055206 5207 5208 5209 5210 5211 5212 5213 5214 5215 5216 5217 5218 5219 5220 5221 5222 5223 5224 5225 5226 5227 5228 5229 5230 5231 5232 5233 5234 5235 523652375238 5239 52405241 5242 5243 5244 5245 5246 5247 5248 5249 5250 5252 5253 5255 5256 5258 5259 5260 5261 5262 5263 5264 5265 5266 5267 5268 5269 5270 5271 5272 5273 35353535 ONLY ONLY ONLY ONLYONLY ONLY ONLY ONLY ONLY ONLY O N LY O N LY X X X X X X X X X X X X X X +176'-06'' up up +155 '-7 1/2" +141'-6'' +14 1'-6'' +155 '-7 1/2" +15 6'-7 1/2" GE NE R AT OR B AC KUP DIESEL GE NE R ATOR B AC KUP DIESEL (F UT URE) GE NER ATO R B AC KUP DIESEL DIESEL S T O R AGE T ANK ABO VE GR OUND DIES E L STO R AG E T ANK AB OVE GR OUND 36'-6" "16 14'-0 6'-0" "814'-9 "1613 417'-5 "856'-7 9'-2" "16 150'-2 "1699'-0 "16 150'-2 "1699'-0 "16150'-2 "1611 13'-10 "16158'-5 "16914'-3 28'-7" 4'-0" 3" 16'-1" 8'-0" "16 19 APP004.25 AO M 4.21 AOM 4.22 AOM 4.23 AOM 4.24 AOM 4.25 APP004 .11 AOM 4.11 AOM 4.12 AO M 4.13 AOM 4.14 AOM 4.15 WDM 14/15 WDM 12/13 WDM 11/21 APP004.24 APP004.23 APP004.22APP004.21 APP004.14 APP004.12 APP004.13 EDM2EDM1 TEL E1TEL E2 TELEC WDM 22/23 WDM 24/25 APP004.15 APP004.35 AOM 4.31 AOM 4.32 AO M 4.33 AO M 4.34 AO M 4.35 APP004.41 AO M 4.41 AOM 4.42 AOM 4.43 AO M 4.44 AOM 4.45 WDM 44/45 WDM 42/43 WDM 31/41 APP004.34 APP004.33 APP004.32 APP004.31 APP004.44 APP004.42 APP004.43 WDM 32/33 WDM 34/35 APP004.45 EDM4 EDM3 TELE 3 TE L E4 8'-3" 7'-6" 4'-8" 9'-5" 4'-8" 9'-5" 5'-6" 9'-5" 4'-8" 9'-5" 4'-8" 9'-5" 4'-8" 9'-5" 4'-8" 9'-5" 7'-6" 7'-6" 6'-7" 5'-10" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 10'-5" 5' 5' 3' 5'-10" 3' 5'-10" 3' 4' 4' 4' 4' 29'-2" 29'-2" 29'-2" 29'-2" 5' 5' 5' 5' 5' 8' 17'-1" 4'-1" 1'-1" 8' 4'-8" 29'-2" 29'-2" 29'-2" 29'-2" 4' 4' 4' 4' 4' 5' 5' 5'-10" 6'-7" 3' 3'-10" 6'-7" 6'-3" 6'-3" 6'-3" 6'-3" 6'-7" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 6'-3" 0" 6'-3" 6'-3" 6'-3" 5'-10" 3' 5'-10" 8'-3" 6'-3" 5' 4'-3" 4'-3" 8' 8'-6" 8' 4'-3" 4'-3" 10' 9'-6" 8'-6" 8' 8'-6" 8' 4'-3" 4'-3" 5' 9' 4'-8" 4'-9" 9' 5' 4'-3" 4'-3" 8' 8'-6" 8' 8'-6" 9'-6" 8' 8'-6" 8' 8'-6" 8' 4'-3"4'-3" 4'-11" 9'-5" 4'-8" 9'-5" 4'-8" 3' 4'-1" 10'-5" 10'-5" 4'-5" 4'-5" 4'-3" 6'-7" 7' 2'-2"3'-1" 4'1' 3' 3' 4' 29'-2" 4' 4' 4' 4' 4' 4' 8' 17'-1" 4'-1" 1'-1" 8'4'-8" 4' 4' 4' 4' 4' 29'-2" 4'-1" 3' 8' 8' 6'-3" 3' 7' 2'-2" 4'4'1' 3'-1" 3'3'3' DN DN N o r t h T a n t a u A v e n u e N o r t h T a n t a u A v e n u e N o r t h T a n t a u A v e n u e N o r t h T a n t a u A v e n u e Pruneridge Avenue I-2 80 N B O ff-R am p I-28 0 I-28 0 N o r t h W o l f e R o a d N o r t h T a n t a u A v e n u e Office Building - Tantau 9 Office Building - Tantau 9 Office Building - Tantau 9 Parking Structure - Tantau 10 Tantau 11 South Testing Facilities - Tantau 11 South Testing Facilities - Tantau 11 South Testing Facilities - Tantau 12 North Testing Facilities - Tantau 12 North Testing Facilities - Parking Structure Tantau 14 Mar-Comm Building Tantau 14 Mar-Comm Building Tantau 14 20 15 16 12 1 h 15 1 h 12 12 10 1 h Calabazas Creek Calabazas Creek C a la b a z a s C re e k C a la b a za s C re e k Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive 01 02/25/2015 00 02/25/2015 Planning - Site & Architectural Review MD 2193 Apple, Inc. © Foster Partners 2014www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue North Tantau Avenue Site A Visitors Center & Parking Apple Campus 2, Phase 1 01 04/20/2015 MDPlanning - Site & Arch. Review Resubmit 3194 3195 3195 Legend 3194 3195 3194 3194 3194 Standard Trees to Remain 781 Trees Specimen Trees to Remain 01 Trees Standard Trees to be Transplanted 81 Trees Specimen Trees to be Transplanted 18 Trees Standard Trees to Be Removed 3,576 Trees Specimen Trees to Be Removed 49 Trees Total Existing Trees 4,506 Trees Total Existing Trees to be Removed 3,625 Trees Summary AC2 Overall Project Tree Quantity Total 624 Trees 0 Trees 75 Trees 18 Trees 3,264 Trees 49 Trees 4,030 Trees 3,313 Trees 0 Trees 0 Trees 0 Trees 0 Trees Quantity Site B Phase 2 - 21 Trees 48 Trees 69 Trees 48 Trees 1 Trees 6 Trees 0 Trees 0 Trees Quantity Site C+D Phase 2 - 136 Trees 264 Trees 407 Trees 264 Trees Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Specimen Tree To Remain Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Specimen Tree To Be Removed Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Specimen Tree To Be Transplanted Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Standard Tree To Remain Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Standard Tree to be Transplanted Per Phase 2 Sites C+D Planning Sub. - Oct 2014 Existing Standard Tree To Be Removed Per Site A Planning Submission - Feb 2015 Existing Standard/Specimen Tree To Remain Per Site A Planning Submission - Feb 2015 Existing Standard/Specimen Tree to be Transplanted Per Site A Planning Submission - Feb 2015 Existing Standard/Specimen Tree To Be Removed 0 Trees 0 Trees 0 Trees 0 Trees Quantity Site A Phase 1 - 51 Trees 54 Trees 54 Trees Site A) (including Quantity Phase 1 105 Trees LE G E N D EV CP C P C P CP CP C P C P C P C P C P C P C P C P C P CP C P C P CP CPCP EV E V E V E V E V E V E V E V CP C P CP C P EV EV CP EVEVEV E V E V CP C P C P EV E V EV E V E V E V E V EV E V E V E V E V CPCPCP CP C P EV E V E V E V E V EV E V E V CP EV E V E V E V E V EV E V E V E V E V EV E V CP C P C P C P CP C P P- V C - 4 . 2 0 02 La n d s c a p e P l a n 02 / 2 5 / 2 0 1 5 1 " = 3 0 ' ( 1 : 3 6 0 ) 00 0 2 / 2 5 / 2 0 1 5 P l a n n i n g - S i t e & A r c h i t e c t u r a l R e v i e w K M 01 0 4 / 2 0 / 2 0 1 5 P l a n n i n g - S i t e & A r c h i t e c t u r a l R e v i e w S R 02 0 7 / 0 1 / 2 0 1 5 P l a n n i n g - S i t e & A r c h i t e c t u r a l R e v i e w S R 13 4 2 2 N N Ke y P l a n Pr o j e c t N o . D a t e Re v i s i o n Nu m b e r Ti t l e Pr o j e c t Cl i e n t Re v . D a t e R e a s o n F o r I s s u e Ch k . Ge n e r a l N o t e s Do n o t s c a l e d r a w i n g s . D i m e n s i o n s g o v e r n . 1. Al l d i m e n s i o n s a r e i n f e e t a n d i n c h e s u n l e s s n o t e d o t h e r w i s e . 2.3.4.5. A n y a r e a s i n d i c a t e d o n t h i s s h e e t a r e a p p r o x i m a t e a n d i n d i c a t i v e o n l y . Fo s t e r + P a r t n e r s s h a l l b e n o t i f i e d i n w r i t i n g o f a n y d i s c r e p a n c i e s . Al l d i m e n s i o n s s h a l l b e v e r i f i e d o n s i t e b e f o r e p r o c e e d i n g w i t h t h e w o r k . Sc a l e a t A R C H E 1 S i z e 19 0 5 0 P r u n e r i d g e A v e n u e Cu p e r t i n o , C A 9 5 0 1 4 T + 1 ( 4 0 8 ) 6 1 0 - 5 8 0 0 ww w . f o s t e r a n d p a r t n e r s . c o m ) R V W H U 3 D U W Q H U V ## SU B - T I T L E S #/ # " = # ' # " ( # : # ) Ap p l e , I n c . Ap p l e C a m p u s 2 , P h a s e 1 No r t h T a n t a u A v e n u e Si t e A Vi s i t o r s C e n t e r & P a r k i n g 01Landscape Plan1"=30' (1:360) LE G E N D EV CP C P C P CP CP C P C P C P C P C P C P C P C P C P CP C P C P CP CPCP EV E V E V E V E V E V E V E V CP C P CP C P EV EV CP EVEVEV E V E V CP C P C P EV E V EV E V E V E V E V EV E V E V E V E V CPCPCP CP C P EV E V E V E V E V EV E V E V CP EV E V E V E V E V EV E V E V E V E V EV E V CP C P C P C P CP C P Ex i s t i n g T r e e s t o R e m a i n : 51 Pr o p o s e d T r e e s : 29 6 To t a l T r e e s : 34 6 P- V C - 4 . 3 0 02 Pl a n t i n g P l a n - T r e e s 02 / 2 5 / 2 0 1 5 1 " = 3 0 ' ( 1 : 3 6 0 ) 00 0 2 / 2 5 / 2 0 1 5 P l a n n i n g - S i t e & A r c h i t e c t u r a l R e v i e w K M 01 0 4 / 2 0 / 2 0 1 5 P l a n n i n g - S i t e & A r c h i t e c t u r e a l R e v i e w J V 02 0 7 / 0 1 / 2 0 1 5 P l a n n i n g - S i t e & A r c h i t e c t u r a l R e v i e w S R 13 4 2 01Planting Plan - Trees1"=30' (1:360) N N Ke y P l a n Pr o j e c t N o . D a t e Re v i s i o n Nu m b e r Ti t l e Pr o j e c t Cl i e n t Re v . D a t e R e a s o n F o r I s s u e Ch k . Ge n e r a l N o t e s Do n o t s c a l e d r a w i n g s . D i m e n s i o n s g o v e r n . 1. Al l d i m e n s i o n s a r e i n f e e t a n d i n c h e s u n l e s s n o t e d o t h e r w i s e . 2.3.4.5. A n y a r e a s i n d i c a t e d o n t h i s s h e e t a r e a p p r o x i m a t e a n d i n d i c a t i v e o n l y . Fo s t e r + P a r t n e r s s h a l l b e n o t i f i e d i n w r i t i n g o f a n y d i s c r e p a n c i e s . Al l d i m e n s i o n s s h a l l b e v e r i f i e d o n s i t e b e f o r e p r o c e e d i n g w i t h t h e w o r k . Sc a l e a t A R C H E 1 S i z e 19 0 5 0 P r u n e r i d g e A v e n u e Cu p e r t i n o , C A 9 5 0 1 4 T + 1 ( 4 0 8 ) 6 1 0 - 5 8 0 0 ww w . f o s t e r a n d p a r t n e r s . c o m ) R V W H U 3 D U W Q H U V ## SU B - T I T L E S #/ # " = # ' # " ( # : # ) Ap p l e , I n c . Ap p l e C a m p u s 2 , P h a s e 1 No r t h T a n t a u A v e n u e Si t e A Vi s i t o r s C e n t e r & P a r k i n g LE G E N D EV CP C P C P CP CP C P C P C P C P C P C P C P C P C P CP C P C P CP CPCP EV E V E V E V E V E V E V E V CP C P CP C P EV EV CP EVEVEV E V E V CP C P C P EV E V EV E V E V E V E V EV E V E V E V E V CPCPCP CP C P EV E V E V E V E V EV E V E V CP EV E V E V E V E V EV E V E V E V E V EV E V CP C P C P C P CP C P 02 Pl a n n i n g - S i t e & A r c h i t e c t u r a l R e v i e w 07 / 0 1 / 2 0 1 5 SR P- V C - 4 . 3 1 0 2 Pl a n t i n g P l a n - H e r b a c e o u s 02 / 2 5 / 2 0 1 5 1 " = 3 0 ' ( 1 : 3 6 0 ) 00 0 2 / 2 5 / 2 0 1 5 P l a n n i n g - S i t e & A r c h i t e c t u r a l R e v i e w K M 01 0 4 / 2 0 / 2 0 1 5 P l a n n i n g - S i t e & A r c h i t e c t u r a l R e v i e w J V 13 4 2 01Planting Plan - Herbaceous1"=30' (1:360) N N Ke y P l a n Pr o j e c t N o . D a t e Re v i s i o n Nu m b e r Ti t l e Pr o j e c t Cl i e n t Re v . D a t e R e a s o n F o r I s s u e Ch k . Ge n e r a l N o t e s Do n o t s c a l e d r a w i n g s . D i m e n s i o n s g o v e r n . 1. Al l d i m e n s i o n s a r e i n f e e t a n d i n c h e s u n l e s s n o t e d o t h e r w i s e . 2.3.4.5. A n y a r e a s i n d i c a t e d o n t h i s s h e e t a r e a p p r o x i m a t e a n d i n d i c a t i v e o n l y . Fo s t e r + P a r t n e r s s h a l l b e n o t i f i e d i n w r i t i n g o f a n y d i s c r e p a n c i e s . Al l d i m e n s i o n s s h a l l b e v e r i f i e d o n s i t e b e f o r e p r o c e e d i n g w i t h t h e w o r k . Sc a l e a t A R C H E 1 S i z e 19 0 5 0 P r u n e r i d g e A v e n u e Cu p e r t i n o , C A 9 5 0 1 4 T + 1 ( 4 0 8 ) 6 1 0 - 5 8 0 0 ww w . f o s t e r a n d p a r t n e r s . c o m ) R V W H U 3 D U W Q H U V ## SU B - T I T L E S #/ # " = # ' # " ( # : # ) Ap p l e , I n c . Ap p l e C a m p u s 2 , P h a s e 1 No r t h T a n t a u A v e n u e Si t e A Vi s i t o r s C e n t e r & P a r k i n g Plant Schedule - Species Under ReviewNTS01 02 Pl a n n i n g - S i t e & A r c h i t e c t u r a l R e v i e w 07 / 0 1 / 2 0 1 5 SR P- V C - 4 . 3 2 0 2 Pl a n t i n g S c h e d u l e 02 / 2 5 / 2 0 1 5 N T S 00 0 2 / 2 5 / 2 0 1 5 P l a n n i n g - S i t e & A r c h i t e c t u r a l R e v i e w K M 01 0 4 / 2 0 / 2 0 1 5 P l a n n i n g - s i t e & A r c h i t e c t u r a l R e v i e w J V 13 4 2 N Ke y P l a n Pr o j e c t N o . D a t e Re v i s i o n Nu m b e r Ti t l e Pr o j e c t Cl i e n t Re v . D a t e R e a s o n F o r I s s u e Ch k . Ge n e r a l N o t e s Do n o t s c a l e d r a w i n g s . D i m e n s i o n s g o v e r n . 1. Al l d i m e n s i o n s a r e i n f e e t a n d i n c h e s u n l e s s n o t e d o t h e r w i s e . 2.3.4.5. A n y a r e a s i n d i c a t e d o n t h i s s h e e t a r e a p p r o x i m a t e a n d i n d i c a t i v e o n l y . Fo s t e r + P a r t n e r s s h a l l b e n o t i f i e d i n w r i t i n g o f a n y d i s c r e p a n c i e s . Al l d i m e n s i o n s s h a l l b e v e r i f i e d o n s i t e b e f o r e p r o c e e d i n g w i t h t h e w o r k . Sc a l e a t A R C H E 1 S i z e 19 0 5 0 P r u n e r i d g e A v e n u e Cu p e r t i n o , C A 9 5 0 1 4 T + 1 ( 4 0 8 ) 6 1 0 - 5 8 0 0 ww w . f o s t e r a n d p a r t n e r s . c o m ) R V W H U 3 D U W Q H U V ## SU B - T I T L E S #/ # " = # ' # " ( # : # ) Ap p l e , I n c . Ap p l e C a m p u s 2 , P h a s e 1 No r t h T a n t a u A v e n u e Si t e A Vi s i t o r s C e n t e r & P a r k i n g Tantau Blvd Street Trees - SouthWestern Deciduous Oaks with Native LawnNTS01 Ta n t a u B l v d M e d i a n s - N a t i v e E v e r g r e e n O a k NT S 02 Redwood - Cedar Understory NTS04 Pa r k i n g L o t M e d i a n s & I s l a n d s - S o u t h e r n L i v e O a k w i t h N a t i v e L a w n NT S 05 Sw a l e / S t o r m w a t e r A r e a s NT S 06 Carex pansa - Pacific Dune SedgeEriophyllum inatum - Woolly SunflowerEschscholzia californica - California PoppyAchillea millefolim 'Black Butte' - YarrowQuercus shumardii - Shumard Red OakQuercus castaenifolia - Chestnut Leaf Oak Ce a n o t h u s t h y r s i f l o r u s - C a l i f o r n i a l i l a c Sa l v i a a p i a n a - W h i t e S a g e Fe s t u c a i d a h o e n s i s - B l u e B u n c h g r a s s , E s c h s c h o l z i a c a l i f o r n i c a - C a l . P o p p y Mi m u l u s a u r a n t i a c u s - M o n k e y f l o w e r No t e : S p e c i e s U n d e r R e v i e w 01 Pl a n n i n g - S i t e & A r c h i t e c t u r a l R e v i e w 07 / 0 1 / 2 0 1 5 SR P- V C - 4 . 3 3 0 1 Pl a n t i n g P a l e t t e 02 / 2 5 / 2 0 1 5 N T S 00 0 2 / 2 5 / 2 0 1 5 P l a n n i n g - S i t e & A r c h i t e c t u r a l R e v i e w K M 13 4 2 Qu e r c u s e n g e l m a n i i - E n g e l m a n n O a k Sequoia sempervirens - Coast Redwood Cedrus atlantica - Atlas CedarCercis occidentalis - Western Redbud Vi s i t o r C e n t e r B u i l d i n g P l a z a NT S 03 Qu e r c u s v i r g i n i a n a - S o u t h e r n L i v e O a k Fe s t u c a i d a h o e n s i s - B l u e B u n c h g r a s s Mo n a r d e l l a v i l l o s a - C o y o t e M i n t Na s s e l l a c e r n u a - N o d d i n g N e e d l e G r a s s Ep i l o b i u m c a n u m ( Z a u s c h e r n i a ) - C a l i f o r n i a F u s c h i a Mu h l e n b e r g i a r i g e n s - D e e r G r a s s Ribes sanguinium 'White icicle' - Flowering Current Polystichum munitum - Sword FernSalvia spathacea - Hummingbird Sage Es c h s c h o l z i a c a l i f o r n i c a - C a l i f o r n i a P o p p y Ca r e x p a n s a - P a c i f i c D u n e S e d g e Er i o p h y l l u m i n a t u m - W o o l l y S u n f l o w e r Es c h s c h o l z i a c a l i f o r n i c a - C a l i f o r n i a P o p p y Ac h i l l e a m i l l e f o l i m ' B l a c k B u t t e ' - Y a r r o w Ga u r a l i n d h e i m e r i - G a u r a Sc a b i o s a ' B u t t e r f l y B l u e ' - P i n c u s h i o n F l o w e r Ca r e x b a r b a r a e - S a n t a B a r b a r a S e d g e N Ke y P l a n Pr o j e c t N o . D a t e Re v i s i o n Nu m b e r Ti t l e Pr o j e c t Cl i e n t Re v . D a t e R e a s o n F o r I s s u e Ch k . Ge n e r a l N o t e s Do n o t s c a l e d r a w i n g s . D i m e n s i o n s g o v e r n . 1. Al l d i m e n s i o n s a r e i n f e e t a n d i n c h e s u n l e s s n o t e d o t h e r w i s e . 2.3.4.5. A n y a r e a s i n d i c a t e d o n t h i s s h e e t a r e a p p r o x i m a t e a n d i n d i c a t i v e o n l y . Fo s t e r + P a r t n e r s s h a l l b e n o t i f i e d i n w r i t i n g o f a n y d i s c r e p a n c i e s . Al l d i m e n s i o n s s h a l l b e v e r i f i e d o n s i t e b e f o r e p r o c e e d i n g w i t h t h e w o r k . Sc a l e a t A R C H E 1 S i z e 19 0 5 0 P r u n e r i d g e A v e n u e Cu p e r t i n o , C A 9 5 0 1 4 T + 1 ( 4 0 8 ) 6 1 0 - 5 8 0 0 ww w . f o s t e r a n d p a r t n e r s . c o m ) R V W H U 3 D U W Q H U V ## SU B - T I T L E S #/ # " = # ' # " ( # : # ) Ap p l e , I n c . Ap p l e C a m p u s 2 , P h a s e 1 No r t h T a n t a u A v e n u e Si t e A Vi s i t o r s C e n t e r & P a r k i n g Ol e a e u r o p e a ' S w a n H i l l ' - S w a n H i l l F r u i t l e s s O l i v e LE G E N D Site Property Line 25' Rear Setback eniL ytreporP etiS kcabteS ediS teertS '51 tnemesaE ytilitU cilbuP eniL ytreporP etiSkcabteS ediS roiretnI '52 15' Front Setback Site Property Line Site Property Line 15' Front SetbackeniL ytreporP etiS kcabteS ediS roiretnI '52 )'61 nahT rellaT sgnidliuB( laitnediseR morF kcabteS ediS roiretnI '051 kcabteS ediS teertS '51 tnemesaE ytilitU cilbuP eniL ytreporP etiS)'61 na h T r e l l a T s g n i d l i u B ( l a i t n e d i s e R m o r F k c a b t e S e d i S r o i r e t n I ' 0 5 1 50'x8' Triangular Obstruction Free Zone (3' Max. Ht.)50'x8' Triangular Obstruction Free Zone (3' Max. Ht.) 50 ' x 8 ' T r i a n g u l a r Ob s t r u c t i o n F r e e Z o n e ( 3 ' M a x . H t . ) 50 ' x 8 ' T r i a n g u l a r Ob s t r u c t i o n F r e e Z o n e ( 3 ' M a x . H t . ) EV CP C P C P CP CP C P C P C P C P C P C P C P C P C P CP C P C P CP CPCP EV E V E V E V E V E V E V E V CP C P CP C P EV EV CP EVEVEV E V E V CP C P C P EV E V EV E V E V E V E V EV E V E V E V E V CPCPCP CP C P EV E V E V E V E V EV E V E V CP EV P- V C - 4 . 4 0 0 0 Ma t e r i a l s P l a n 02 / 2 5 / 2 0 1 5 1 " = 3 0 ' ( 1 : 3 6 0 ) 00 0 2 / 2 5 / 2 0 1 5 P l a n n i n g - S i t e & A r c h i t e c t u r a l R e v i e w K M 01 0 4 / 2 0 / 2 0 1 5 P l a n n i n g - S i t e & A r c h i t e c t u r a l R e v i e w J V 13 4 2 Materials Plan1"=30' (1:360) N N Ke y P l a n Pr o j e c t N o . D a t e Re v i s i o n Nu m b e r Ti t l e Pr o j e c t Cl i e n t Re v . D a t e R e a s o n F o r I s s u e Ch k . Ge n e r a l N o t e s Do n o t s c a l e d r a w i n g s . D i m e n s i o n s g o v e r n . 1. Al l d i m e n s i o n s a r e i n f e e t a n d i n c h e s u n l e s s n o t e d o t h e r w i s e . 2.3.4.5. A n y a r e a s i n d i c a t e d o n t h i s s h e e t a r e a p p r o x i m a t e a n d i n d i c a t i v e o n l y . Fo s t e r + P a r t n e r s s h a l l b e n o t i f i e d i n w r i t i n g o f a n y d i s c r e p a n c i e s . Al l d i m e n s i o n s s h a l l b e v e r i f i e d o n s i t e b e f o r e p r o c e e d i n g w i t h t h e w o r k . Sc a l e a t A R C H E 1 S i z e 19 0 5 0 P r u n e r i d g e A v e n u e Cu p e r t i n o , C A 9 5 0 1 4 T + 1 ( 4 0 8 ) 6 1 0 - 5 8 0 0 ww w . f o s t e r a n d p a r t n e r s . c o m © F o s t e r P a r t n e r s 2 0 1 4 Ap p l e , I n c . Ap p l e C a m p u s 2 , P h a s e 1 No r t h T a n t a u A v e n u e Si t e A Vi s i t o r s C e n t e r & P a r k i n g Typical Concrete SidewalkNTS01 St a b i l i z e d A g g r e g a t e P a v i n g NT S 02 P- V C - 4 . 4 1 00 La n d s c a p e M a t e r i a l s 02 / 2 5 / 2 0 1 5 N T S 00 0 2 / 2 5 / 2 0 1 5 P l a n n i n g - S i t e & A r c h i t e c t u r a l R e v i e w K M 13 4 2 N Ke y P l a n Pr o j e c t N o . D a t e Re v i s i o n Nu m b e r Ti t l e Pr o j e c t Cl i e n t Re v . D a t e R e a s o n F o r I s s u e Ch k . Ge n e r a l N o t e s Do n o t s c a l e d r a w i n g s . D i m e n s i o n s g o v e r n . 1. Al l d i m e n s i o n s a r e i n f e e t a n d i n c h e s u n l e s s n o t e d o t h e r w i s e . 2.3.4.5. A n y a r e a s i n d i c a t e d o n t h i s s h e e t a r e a p p r o x i m a t e a n d i n d i c a t i v e o n l y . Fo s t e r + P a r t n e r s s h a l l b e n o t i f i e d i n w r i t i n g o f a n y d i s c r e p a n c i e s . Al l d i m e n s i o n s s h a l l b e v e r i f i e d o n s i t e b e f o r e p r o c e e d i n g w i t h t h e w o r k . Sc a l e a t A R C H E 1 S i z e 19 0 5 0 P r u n e r i d g e A v e n u e Cu p e r t i n o , C A 9 5 0 1 4 T + 1 ( 4 0 8 ) 6 1 0 - 5 8 0 0 ww w . f o s t e r a n d p a r t n e r s . c o m ) R V W H U 3 D U W Q H U V ## SU B - T I T L E S #/ # " = # ' # " ( # : # ) Ap p l e , I n c . Ap p l e C a m p u s 2 , P h a s e 1 No r t h T a n t a u A v e n u e Si t e A Vi s i t o r s C e n t e r & P a r k i n g LE G E N D Site Property Line 25' Rear Setback eniL ytreporP etiS kcabteS ediS teertS '51 tnemesaE ytilitU cilbuP eniL ytreporP etiSkcabteS ediS roiretnI '52 15' Front Setback Site Property Line Site Property Line 15' Front SetbackeniL ytreporP etiS kcabteS ediS roiretnI '52 )'61 nahT rellaT sgnidliuB( laitnediseR morF kcabteS ediS roiretnI '051 kcabteS ediS teertS '51 tnemesaE ytilitU cilbuP eniL ytreporP etiS)'61 na h T r e l l a T s g n i d l i u B ( l a i t n e d i s e R m o r F k c a b t e S e d i S r o i r e t n I ' 0 5 1 50'x8' Triangular Obstruction Free Zone (3' Max. Ht.)50'x8' Triangular Obstruction Free Zone (3' Max. Ht.) 50 ' x 8 ' T r i a n g u l a r Ob s t r u c t i o n F r e e Z o n e ( 3 ' M a x . H t . ) 50 ' x 8 ' T r i a n g u l a r Ob s t r u c t i o n F r e e Z o n e ( 3 ' M a x . H t . ) EV CP C P C P CP CP C P C P C P C P C P C P C P C P C P CP C P C P CP CPCP EV E V E V E V E V E V E V E V CP C P CP C P EV EV CP EVEVEV E V E V CP C P C P EV E V EV E V E V E V E V EV E V E V E V E V CPCPCP CP C P EV E V E V E V E V EV E V E V CP EV P- V C - 4 . 5 0 0 1 Si t e L i g h t i n g 02 / 2 5 / 2 0 1 5 1 " = 3 0 ' ( 1 : 3 6 0 ) 00 0 2 / 2 5 / 2 0 1 5 P l a n n i n g - S i t e & A r c h i t e c t u r a l R e v i e w K M 01 0 4 / 2 0 / 2 0 1 5 P l a n n i n g - S i t e & A r c h i t e c t u r a l R e v i e w S R 13 4 2 Site Lighting Plan1"=30' (1:360) N N Ke y P l a n Pr o j e c t N o . D a t e Re v i s i o n Nu m b e r Ti t l e Pr o j e c t Cl i e n t Re v . D a t e R e a s o n F o r I s s u e Ch k . Ge n e r a l N o t e s Do n o t s c a l e d r a w i n g s . D i m e n s i o n s g o v e r n . 1. Al l d i m e n s i o n s a r e i n f e e t a n d i n c h e s u n l e s s n o t e d o t h e r w i s e . 2.3.4.5. A n y a r e a s i n d i c a t e d o n t h i s s h e e t a r e a p p r o x i m a t e a n d i n d i c a t i v e o n l y . Fo s t e r + P a r t n e r s s h a l l b e n o t i f i e d i n w r i t i n g o f a n y d i s c r e p a n c i e s . Al l d i m e n s i o n s s h a l l b e v e r i f i e d o n s i t e b e f o r e p r o c e e d i n g w i t h t h e w o r k . Sc a l e a t A R C H E 1 S i z e 19 0 5 0 P r u n e r i d g e A v e n u e Cu p e r t i n o , C A 9 5 0 1 4 T + 1 ( 4 0 8 ) 6 1 0 - 5 8 0 0 ww w . f o s t e r a n d p a r t n e r s . c o m © F o s t e r P a r t n e r s 2 0 1 4 Ap p l e , I n c . Ap p l e C a m p u s 2 , P h a s e 1 No r t h T a n t a u A v e n u e Si t e A Vi s i t o r s C e n t e r & P a r k i n g Lighting - Pole Type 2 NTS01 Li g h t i n g - P e d e s t r i a n B o l l a r d NT S 02 Li g h t i n g - F e a t u r e L i g h t i n g NT S 03 P- V C - 4 . 6 0 00 Si t e F u r n i s h i n g s 02 / 2 5 / 2 0 1 5 N T S 00 0 2 / 2 5 / 2 0 1 5 P l a n n i n g - S i t e & A r c h i t e c t u r a l R e v i e w K M 13 4 2 N Ke y P l a n Pr o j e c t N o . D a t e Re v i s i o n Nu m b e r Ti t l e Pr o j e c t Cl i e n t Re v . D a t e R e a s o n F o r I s s u e Ch k . Ge n e r a l N o t e s Do n o t s c a l e d r a w i n g s . D i m e n s i o n s g o v e r n . 1. Al l d i m e n s i o n s a r e i n f e e t a n d i n c h e s u n l e s s n o t e d o t h e r w i s e . 2.3.4.5. A n y a r e a s i n d i c a t e d o n t h i s s h e e t a r e a p p r o x i m a t e a n d i n d i c a t i v e o n l y . Fo s t e r + P a r t n e r s s h a l l b e n o t i f i e d i n w r i t i n g o f a n y d i s c r e p a n c i e s . Al l d i m e n s i o n s s h a l l b e v e r i f i e d o n s i t e b e f o r e p r o c e e d i n g w i t h t h e w o r k . Sc a l e a t A R C H E 1 S i z e 19 0 5 0 P r u n e r i d g e A v e n u e Cu p e r t i n o , C A 9 5 0 1 4 T + 1 ( 4 0 8 ) 6 1 0 - 5 8 0 0 ww w . f o s t e r a n d p a r t n e r s . c o m ) R V W H U 3 D U W Q H U V ## SU B - T I T L E S #/ # " = # ' # " ( # : # ) Ap p l e , I n c . Ap p l e C a m p u s 2 , P h a s e 1 No r t h T a n t a u A v e n u e Si t e A Vi s i t o r s C e n t e r & P a r k i n g LE G E N D VISITORCENTER N T A N T A U A V E PRUNERIDGE AVESite Wall Diagram1"=30'01Residential WallNTS02 Si t e S o u n d w a l l NT S 03 P- V C - 4 . 7 0 00 Si t e W a l l s 02 / 2 5 / 2 0 1 5 N T S 00 0 2 / 2 5 / 2 0 1 5 P l a n n i n g - S i t e & A r c h i t e c t u r a l R e v i e w K M 13 4 2 N N Ke y P l a n Pr o j e c t N o . D a t e Re v i s i o n Nu m b e r Ti t l e Pr o j e c t Cl i e n t Re v . D a t e R e a s o n F o r I s s u e Ch k . Ge n e r a l N o t e s Do n o t s c a l e d r a w i n g s . D i m e n s i o n s g o v e r n . 1. Al l d i m e n s i o n s a r e i n f e e t a n d i n c h e s u n l e s s n o t e d o t h e r w i s e . 2.3.4.5. A n y a r e a s i n d i c a t e d o n t h i s s h e e t a r e a p p r o x i m a t e a n d i n d i c a t i v e o n l y . Fo s t e r + P a r t n e r s s h a l l b e n o t i f i e d i n w r i t i n g o f a n y d i s c r e p a n c i e s . Al l d i m e n s i o n s s h a l l b e v e r i f i e d o n s i t e b e f o r e p r o c e e d i n g w i t h t h e w o r k . Sc a l e a t A R C H E 1 S i z e 19 0 5 0 P r u n e r i d g e A v e n u e Cu p e r t i n o , C A 9 5 0 1 4 T + 1 ( 4 0 8 ) 6 1 0 - 5 8 0 0 ww w . f o s t e r a n d p a r t n e r s . c o m ) R V W H U 3 D U W Q H U V ## SU B - T I T L E S #/ # " = # ' # " ( # : # ) Ap p l e , I n c . Ap p l e C a m p u s 2 , P h a s e 1 No r t h T a n t a u A v e n u e Si t e A Vi s i t o r s C e n t e r & P a r k i n g AR C H I T E C T U R E - V i s i t o r s C e n t e r & P a r k i n g Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking N P1 P3P2 B C D E 01 02 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 37032036 B C D E 01 02 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 37032036 ROOM STORAGE 31Z1 STAIR #2 31S2 STORAGE ROOM 31Z3 LEVEL B3 PARKING GARAGE 31P1 ELEVATOR 31V1 ELEVATOR 31V2 STORAGE ROOM 31Z2 STAIR#1 31S1 B C D E 01 02 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 37032036 17' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"17' 0" A 6 2 ' 0 " 6 2 ' 0 " 6 3 ' 0 " 3 3 ' 0 " 00 2193 04/20/2015 1" = 20' (1:240) Plan View - Level B3 Visitors Center & Parking Plan View - Level B3 P-VC-5.00 0 Electric Vehicle (EV) Charging Stalls Accessible & EV Charging Stalls Standard Parking Stalls (8'-6" x 18'-0") Accessible Parking Stalls (9'-0" x 18'-0") Level B3 Stall Count SUB-TOTAL242 0 0 Carpool Parking Stalls 0 242 00 JLPlanning - Site & Arch. Review Resubmit04/20/2015 UP UP SPEED RAMP UP 15% MAX S I T E P R O P E R T Y L I N E S I T E P R O P E R T Y L I N E SITE PROPERTY LINE PUBLIC UTLITY EASEMENT SITE PROPERTY LINE Gross Floor Area: 85,272 sf. UP -39'-0" (+118'-0") Level B3 01 1"=20' (1:240) N 2 4 ' - 0 " 2 4 '- 0 " 2 4 '- 0 " 24'-0" 24'-0" 2 4 '- 0 " 2 4 '- 0 " 24'-0" P-VC-5.10 02 P-VC-5.10 01 P-VC-5.11 01 7 ' - 6 " 6 7 ' - 1 0 " 4 0 '- 0 " 20'-0"43'-0" Valet parking stalls shown dashed (75 stalls) - Not included in parking count Elevations inside parenthesis (XXX’-XX”) are based on AC2 project benchmark. Note: Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking N elevator pit P3 P1P2 ELEVATOR 21V1 STAIR#1 21S1 STAIR #2 21S2 STORAGE ROOM 21Z2 ELEC. ROOM 21E1 LEVEL B2 PARKING GARAGE 21P1 STORAGE ROOM 21Z1 ELEVATOR 21V2 B C D E 01 02 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 37032036 17' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"17' 0" A 6 2 ' 0 " 6 2 ' 0 " 6 3 ' 0 " 3 3 ' 0 " 01 2193 02/25/2015 1" = 20' (1:240) P-VC-5.01 Plan View - Level B2 Visitors Center & Parking Plan View - Level B2 0 Electric Vehicle (EV) Charging Stalls Accessible & EV Charging Stalls Standard Parking Stalls (8'-6" x 18'-0") Accessible Parking Stalls (9'-0" x 18'-0") Level B2 Stall Count SUB-TOTAL241 0 0 Carpool Parking Stalls 0 241 00 JLPlanning - Site & Architectural Review02/25/2015 01 04/20/2015 Planning - Site & Arch. Review Resubmit JL UP UP SPEED RAMP UP 15% MAX S I T E P R O P E R T Y L I N E S I T E P R O P E R T Y L I N E SITE PROPERTY LINE PUBLIC UTLITY EASEMENT SITE PROPERTY LINE Gross Floor Area: 85,272 sf. SPEED RAMP DN 15% MAX DN UP DN -28'-6" (+128'-6") Level B2 01 1"=20' (1:240) N 2 4 ' - 0 " 2 4 ' - 0 " 2 4 '- 0 " 24'-0" 24'-0" 2 4 '- 0 " 2 4 '- 0 " 24'-0" P-VC-5.10 02 P-VC-5.10 01 P-VC-5.11 01 Valet parking stalls shown dashed (75 stalls) - Not included in parking count Elevations inside parenthesis (XXX’-XX”) are based on AC2 project benchmark. Note: 6 7 ' - 1 0 " 7 ' - 6 " 20'-0" 4 0 '- 0 " 43'-0" Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking N B C D E 01 02 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 37032036 17' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"17' 0" A 6 2 ' 0 " 6 2 ' 0 " 6 3 ' 0 " 3 3 ' 0 " UP STAIR #1 11S1 STAIR #2 11S2 LEVEL B1 PARKING GARAGE 11P1 ELEC. ROOM 11E5 ELEVATOR 12V1 ELEVATOR 11V2 ROOM IS&T 11E4 ELEVATORS 11V1 MECHANICAL ROOM 12M1 STAIR #3 12S1 CTRL. ELEV. 12E3 ROOM ELEV. CTRL. 11E1 STORAGE 11C1 TRASH ROOM 12T1 HALL 12H1 DATA 12E4 IS&T 12E1 ROOM ELEC. 12E2 ROOM MGR. 12O2 CLOSET JANITOR 12J1 BREAK ROOM 12B1 STORAGE DRY 12D1 STORAGE COLD 12C1 RESTROOM MEN'S 12R2 RESTROOM WOMEN'S 12R1 STORAGE 12S1 MGR. CAFE' 12O1 As As As AsAs As As As AsAs P1 P3P2 As AsAs As As P4 02 2193 02/25/2015 1" = 20' (1:240) P-VC-5.02 Plan View - Level B1 Visitors Center & Parking Plan View - Level B1 0 Electric Vehicle (EV) Charging Stalls Accessible & EV Charging Stalls Standard Parking Stalls (8'-6" x 18'-0") Accessible Parking Stalls (9'-0" x 18'-0") Level B1 Stall Count SUB-TOTAL213 14 0 Carpool Parking Stalls 0 199 00 JLPlanning - Site & Architectural Review02/25/2015 01 04/20/2015 Planning - Site & Arch. Review Resubmit JL 02 06/10/2015 JLPlanning - Site & Arch. Review Resubmit 2 03 07/01/2015 Planning - Site & Arch. Review Resubmit 3 NM 03 07/01/2015 Planning - Site & Arch. Review Resubmit 3 NM SPEED RAMP UP UP DN DNUP 15% MAX SITE PROPERTY LINE S I T E P R O P E R T Y L I N E PUBLIC UTLITY EASEMENT SITE PROPERTY LINE S I T E P R O P E R T Y L I N E Gross Floor Area: 90,615 sf. 15% MAX SPEED RAMP DN -18'-0" (+139'-0") Level B1 01 1"=20' (1:240) N P-VC-5.10 02 P-VC-5.10 01 2 4 ' - 0 " 2 4 '- 0 " 24'-0" 2 4 '- 0 " 24'-0" 2 4 '- 0 " 2 4 '- 0 " 24'-0"P-VC-5.11 01 6 7 ' - 1 0 " 7 ' - 6 " 20'-0" 4 0 '- 0 " 43'-0" on-going coordination. Final parking count shall match site total indicated. Extra parking stalls are shown with understanding that some will be lost during Elevations inside parenthesis (XXX’-XX”) are based on AC2 project benchmark. Note: Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking N P3 P1P2 O N L Y ONLYONLY ONLY O N L Y EV CPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCP EV EV EV EV EV EV EV EV CPCP CPCP EVEV CP EV EV EV EV EV CP CP CP EV EV EVEVEVEVEV EVEVEVEVEV CPCPCP CP CP EV EV EV EV EV EVEVEV CP EVEVEVEVEV EVEVEVEVEV EVEV CPCPCPCPCPCP 11 .1" 3 4 3 7 ELEVATORS 01V2 STAIR #2 01S2 STAIR #1 01S1 LEVEL 01 VISITOR CENTER GRADE PARKING 01P1 CAFE 01F1 RECEPTION VISITOR 01L1 BOH 02H1 ELEVATOR 01V1 ELEVATOR 02V3 SALES AREA 01R16 0 ' 0 " Z Y X W V 50 51 52 53 54 55 56 210' 0" 40' 0"20' 0"45' 0"45' 0"20' 0"40' 0" 1 0 ' 0 " 2 0 ' 0 " 2 0 ' 0 " 2 0 ' 0 " 2 0 ' 0 " 1 0 ' 0 " 02 2193 02/25/2015 1" = 20' (1:240) P-VC-5.03 Plan View - Level 01 Visitors Center & Parking Plan View - Level 01 1 Electric Vehicle (EV) Charging Stalls Accessible & EV Charging Stalls Standard Parking Stalls (8'-6" x 18'-0") Accessible Parking Stalls (9'-0" x 18'-0") Level 01 Stall Count SUB-TOTAL116 2 40 Carpool Parking Stalls 47 1 TOTAL Electric Vehicle (EV) Charging Stalls Accessible & EV Charging Stalls Standard Parking Stalls (8'-6" x 18'-0") Accessible Parking Stalls (9'-0" x 18'-0") Parking Garage Total Stall Count 800 16 696 40 Carpool Parking Stalls 47 26 00 JLPlanning - Site & Architectural Review02/25/2015 04/20/2015 Planning - Site & Arch. Review Resubmit JL01 02 06/10/2015 Planning - Site & Arch. Review Resubmit 2 JL 03 07/01/2015 Planning - Site & Arch. Review Resubmit 3 NM TAXI DROP OFF / PICK-UP NORTH TANTAU AVENUE P R U N E R I D E A V E N U E DN SITE PROPERTY LINE S I T E P R O P E R T Y L I N E PUBLIC UTLITY EASEMENT SITE PROPERTY LINE S I T E P R O P E R T Y L I N ESETBACK SETBACK S E T B A C K S E T B A C K SETBACK DN 15% MAX SPEED RAMP DN -0'-0" (+157'-0") Level 01 +0'-0" (+157'-0") Level 01 DROP OFF VALET Gross Floor Area: 12,500 sf. Surplus) Required (8 = 796. 788 Parking Stalls Adjusted Total Parking Stalls. Loss of 4 Ingress/Egress. Future Potential Indicates Dashed Area 01 1"=20' (1:240) N 01 P-VC-5.20 02 P-VC-5.20 P-VC-5.10 02 P-VC-5.10 01 Exhaust Shaft Exhaust Shaft Exhaust Shaft Exhaust Shaft Transformer 24'-0" 2 4 '- 0 " 2 4 '- 0 " 24'-0" 2 4 '- 0 " Air Intake, Typ.Air Intake, Typ. 5'-0" 28'-0" Buffer Landscape 5'-0" Min. ht.) Zone (3' max. Obstruction Free 8'x50' Triangular ht.) Zone (3' max. Obstruction Free 8'x50' Triangular P-VC-5.11 01 Below Grade Parking Garage Outline of on-going coordination. Final parking count shall match site total indicated. Extra parking stalls are shown with understanding that some will be lost during Elevations inside parenthesis (XXX’-XX”) are based on AC2 project benchmark. Note: 2,386 sq ft 2,386 sq ft7,728 sq ft DN DN Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking N O N L Y ONLYONLY ONLY O N L Y EV CPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCPCP EV EV EV EV EV EV EV EV CPCP CPCP EVEV CP EV EV EV EV EV CP CP CP EV EV EVEVEVEVEV EVEVEVEVEV CPCPCP CP CP EV EV EV EV EV EVEVEV CP EVEVEVEVEV EVEVEVEVEV EVEV CPCPCPCPCPCP 11 .1" 3 4 3 7 6 0 ' 0 " Z Y X W V 50 51 52 53 54 55 56 210' 0" 40' 0"20' 0"45' 0"45' 0"20' 0"40' 0" 1 0 ' 0 " 2 0 ' 0 " 2 0 ' 0 " 2 0 ' 0 " 2 0 ' 0 " 1 0 ' 0 " STAIR #2 01S2 LEVEL 01 VISITOR CENTER GRADE PARKING 01P1 STAIR #3 22S1 ELEVATOR 22V3 STAIR #4 22S2 ROOF TERRACE 22R1 ROOF BAR 22H1 02 2193 02/25/2015 1" = 20' (1:240) P-VC-5.04 Visitors Center & Parking Plan View - Roof Level Plan View - Roof Level 00 JLPlanning - Site & Architectural Review02/25/2015 01 04/20/2015 Planning - Site & Arch. Review Resubmit JL 02 06/10/2015 Planning - Site & Arch. Review Resubmit 2 JL 03 07/01/2015 Planning - Site & Arch. Review Resubmit 3 NM +23'-0" (+180'-0") +18'-6" (+175'-6") +10'-0" (+167'-0")+10'-0" (+167'-0")+10'-0" (+167'-0")+10'-0" (+167'-0") +18'-6" (+175'-6")+18'-6" (+175'-6") +10'-0" (+167'-0")+10'-0" (+167'-0") +10'-0" (+167'-0") +10'-0" (+167'-0") 01 1"=20' (1:240) N 02 P-VC-5.20 01 P-VC-5.20P-VC-5.10 02 P-VC-5.10 01 Elevations inside parenthesis (XXX’-XX”) are based on AC2 project benchmark. Note: Stair and Elevator Vestibule Roof Elevator Vestibule Roof Stair Vestibule Roof Mechanical Exhaust Structure Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking N 53525150 54 55 56 40' 0"20' 0"45' 0"45' 0"20' 0"40' 0" 01 02 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 37032036 17' 0"15' 0"15' 0"17' 0"17' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0"15' 0" 2 5 ' R e a r S e t b a c k f r o m P r o p e r t y L in e LEVEL 01 +0'-0" (+157'-0") FFL LEVEL B1 -18'-0" (+139'-0") FFL LEVEL B2 -28'-6" (+128'-6") ROOF LEVEL +23'-0" (180'-0") TO PENTHOUSE ROOF +35'-0" (192'-0") 10' 0"20' 0"20' 0"10' 0" V W X Y Z A B C D E 63' 0"62' 0"62' 0"33' 0" 01 2193 02/25/2015 1" = 20' (1:240) P-VC-5.10 Sections Visitors Center & Parking 00 JLPlanning - Site & Architectural Review02/25/2015 01 04/20/2015 Planning - Site & Arch. Review Resubmit JL LEVEL 01 +0'-0" (+157'-0") FFL LEVEL B1 -18'-0" (+139'-0") FFL LEVEL B2 -28'-6" (+128'-6") ROOF LEVEL +23'-0" (180'-0") EXHAUST +10'-0" (+167'-0") TO PENTHOUSE ROOF +35'-0" (192'-0") TO ELEVATOR ROOF +18'-6" (175'-6") 02 1" = 20' (1:240) Cross-Section - Visitors Center & Parking 01 1" = 20' (1:240) Longitudinal-Section - Visitors Center & Parking Pruneridge Avenue Level B1 Parking Garage Level B2 Parking Garage North Tantau Avenue 1 5 ' S tr e e t S id e S e t a c k fr o m P r o p e r ty Lin e S it e P r o p e r ty Lin e S it e P r o p e r ty Lin e 2 5 ' S id e S e ta c k fr o m P r o p e r t y Lin e Level B1 Parking Garage Level B2 Parking Garage S it e P r o p e r t y Lin e 1 5 ' S t r e e t S id e S e tb a c k fr o m P r o p e r t y Lin e 7 ' - 6 " P u b li c U t l i t y E a s e m e n t 1:1 Setback ( B u il d in g s T a ll e r th a n 1 6 ' ) 1 5 0 ' In te rio r S id e S e tb a c k fr o m R e s id e n t i a l 16' Height Setback S it e P r o p e r t y Lin e 2 5 ' In t e r io r S id e S e t b a c k fr o m P r o p e rty Lin e Level B3 Parking Garage BOH Elevator 60' Height Max. FFL LEVEL B3 -39'-0" (+118'-0") Cafe Visitor Reception Level B3 Parking Garage Display Area Display Area FFL LEVEL B3 -39'-0" (+118'-0") Roof Terrace Roof Terrace Entry Drive AsileValet Drop-off Mech. Exhaust Elevations inside parenthesis (XXX’-XX”) are based on AC2 project benchmark. Note: Stair Stair Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking N 53525150 54 55 56 40' 0"20' 0"45' 0"45' 0"20' 0"40' 0" LEVEL 01 +0'-0" (+157'-0") TO PENTHOUSE ROOF +35'-0" (192'-0") LEVEL 1 CEILING +18'-0" (175'-0") 10' 0"20' 0"20' 0"10' 0" V W X Y Z 01 2193 02/25/2015 1" = 20' (1:240) P-VC-5.20 Visitors Center & Parking Elevations 00 JLPlanning - Site & Architectural Review02/25/2015 01 04/20/2015 Planning - Site & Arch. Review Resubmit JL LEVEL 01 +0'-0" (+157'-0") EXHAUST +10'-0" (+167'-0") LEVEL 1 CEILING +18'-0" (175'-0") TO PENTHOUSE ROOF +35'-0" (192'-0") 02 1" = 20' (1:240) 01 1" = 20' (1:240) West Elevation - Visitors Center & Parking South Elevation - Visitors Center & Parking P-VC-5.10 02 Pruneridge Avenue S it e P r o p e r ty Lin e 2 5 ' S t r e e t S id e S e ta c k fr o m P r o p e r t y Lin e S it e P r o p e r ty Lin e 1 5 ' S id e S e t a c k fr o m P r o p e r t y Lin e S it e P r o p e r ty Lin e S it e P r o p e r ty Lin e 2 5 ' In t e r io r S id e S e tb a c k fr o m P r o p e r t y Lin e ( B u il d in g s T a ll e r th a n 1 6 ') 1 5 0 ' In te r io r S id e S e t b a c k fr o m R e s id e n t i a l North Tantau Avenue 1 5 ' S t r e e t S id e S e tb a c k fr o m P r o p e r t y Lin e 7 ' - 6 " P u b li c U tl i t y E a s e m e n t 1:1 Setback 16' Height Setback P-VC-5.10 01 Public Elevator Mechanical Exhaust 60' Height Max. Cafe CafeVisitor Recption Stair Display Area Roof Terrace Elevations inside parenthesis (XXX’-XX”) are based on AC2 project benchmark. Note: Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking 01 2193 02/25/2015 P-VC-5.30 Visitors Center & Parking Rendered Elevation & External Materials 1/8" = 1'-0" (1:96) MATERIALS: EXTERNAL 4 4. Monolithic Glass3. Metal Louvers2. Stone Cladding1. Carbon Fiber - Painted 1 2 4 342 00 JLPlanning - Site & Architectural Review02/25/2015 01 04/20/2015 Planning - Site & Arch. Review Resubmit JL N 01 Rendered Elevation (South) & External Materials 1/8" = 1'-0" (1:96) Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking 01 2193 02/25/2015 P-VC-5.31 Visitors Center & Parking Rendered Elevation & External Materials 1/8" = 1'-0" (1:96) 4 MATERIALS: EXTERNAL 4. Monolithic Glass3. Metal Louvers2. Stone Cladding1. Carbon Fiber - Painted 4 1 2 4344222 00 JLPlanning - Site & Architectural Review02/25/2015 01 04/20/2015 Planning - Site & Arch. Review Resubmit JL N 01 Rendered Elevation (West) & External Materials 1/8" = 1'-0" (1:96) FFL LEVEL 01 +0'-0" (+157'-0") ELEVATORS 01V1 STAIR #1 AND ELEVATOR 01S1 CAFE 11F1 DISPLAY AREA 11Q1 VISITOR RECEPTION 11L1 MECH 11M1 STAIR 11S1 STAIR 11S2 ELEVATOR 11V1 UP DN UP P3 P1P2 Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking N 6 0 ' 0 " Z Y X W V 50 51 52 53 54 55 56 210' 0" 40' 0"20' 0"45' 0"45' 0"20' 0"40' 0" 1 0 ' 0 " 2 0 ' 0 " 2 0 ' 0 " 2 0 ' 0 " 2 0 ' 0 " 1 0 ' 0 " 01 2193 02/25/2015 1/8"=1'-0" (1:96) P-VC-5.53 Level 01 Enlarged Floor Plan - Level 01 Enlarged Floor Plan 00 JL02/25/2015 Planning - Site & Architectural Review 01 04/20/2015 Planning - Site & Arch. Review Resubmit JL 01 1/8"=1'-0" (1:96) N DN DN Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking N 6 0 ' 0 " Z Y X W V 50 51 52 53 54 55 56 210' 0" 40' 0"20' 0"45' 0"45' 0"20' 0"40' 0" 1 0 ' 0 " 2 0 ' 0 " 2 0 ' 0 " 2 0 ' 0 " 2 0 ' 0 " 1 0 ' 0 " STAIR 21S1 STAIR 21S2 ELEVATOR 21V1 ROOF TERRACE 21R1 ROOF BAR 11M1 01 2193 02/25/2015 1/8"=1'-0" (1:96) P-VC-5.54 Enlarged Floor Plan Enlarged Floor Plan - Roof Level Roof Level 00 JL02/25/2015 Planning - Site & Arch. Review Resubmit 01 04/20/2015 Planning - Site & Arch. Review Resubmit JL +23'-0" (+180'-0") +18'-6" (+175'-6")+18'-6" (+175'-6") +23'-0" (+180'-0") 01 1/8"=1'-0" (1:96) N Outline of Parking Garage Below Grade Glass SkylightGlass SkylightGlass Skylight Glass Skylight Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking N 6 0 ' 0 " Z Y X W V 50 51 52 53 54 55 56 210' 0" 40' 0"20' 0"45' 0"45' 0"20' 0"40' 0" 1 0 ' 0 " 2 0 ' 0 " 2 0 ' 0 " 2 0 ' 0 " 2 0 ' 0 " 1 0 ' 0 " 00 2193 04/20/2015 1/8"=1'-0" (1:96) P-VC-5.55 Enlarged Floor Plan Penthouse Roof Enlarged Floor Plan - Penthouse Roof 00 JL04/20/2015 Planning - Site & Arch. Review Resubmit +23'-0" (+180'-0")+35'-0" (+192'-0")+35'-0" (+192'-0") 18'-6" (+175'-6")18'-6" (+175'-6") 01 1/8"=1'-0" (1:96) N Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking N 5453525150 55 56 210' 0" 40' 0"20' 0"45' 0"45' 0"20' 0"40' 0" LEVEL 01 +0'-0" (+157'-0") TO PENTHOUSE ROOF +35'-0" (192'-0") ROOF LEVEL +23'-0" (180'-0") LEVEL 1 CEILING +18'-0" (175'-0") W XV Y Z 10' 0"20' 0"20' 0"10' 0" 01 2193 02/25/2015 P-VC-5.60 Sections Visitors Center 1/8" = 1'-0" (1:96) 00 JLPlanning - Site & Architectural Review02/25/2015 01 04/20/2015 Planning - Site & Arch. Review Resubmit JL LEVEL 01 +0'-0" (+157'-0") LEVEL 1 CEILING +18'-0" (175'-0") TO PENTHOUSE ROOF +35'-0" (192'-0") ROOF LEVEL +23'-0" (180'-0") 02 01 Cross-Section - Visitors Center 1/8" = 1'-0" (1:96) Longitudinal-Section - Visitors Center 1/8" = 1'-0" (1:96) P-VC-5.10 02 P-VC-5.10 01 Display Area Visitor ReceptionCafe Roof Terrace StairStair Display Area Roof Terrace Elevations inside parenthesis (XXX’-XX”) are based on AC2 project benchmark. Note: Public Elevator Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking 01 2193 02/25/2015 P-VC-5.70 Elevations Visitors Center 1/8" = 1'-0" (1:96) 00 JLPlanning - Site & Architectural Review02/25/2015 01 04/20/2015 Planning - Site & Arch. Review Resubmit JL LEVEL 01 +0'-0" (+157'-0") Display Area Roof Terrace CafeVisitor Reception LEVEL 1 CEILING +18'-0" (175'-0") TO PENTHOUSE ROOF +35'-0" (192'-0") TO ROOF +23'-8" (180'-8") LEVEL 01 +0'-0" (+157'-0") TO PENTHOUSE ROOF +35'-0" (192'-0") Cafe Public Elevator LEVEL 1 CEILING +18'-0" (175'-0") TO ROOF +23'-8" (180'-8") N 02 01 P-VC-5.60 02 P-VC-5.60 01 South Elevation - Visitors Center 1/8" = 1'-0" (1:96) West Elevation - Visitors Center 1/8" = 1'-0" (1:96) Elevations inside parenthesis (XXX’-XX”) are based on AC2 project benchmark. Note: AR C H I T E C T U R E - V i s u a l i z a t i o n s Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking 01 2193 02/25/2015 P-VC-6.00 Perspective View Visitors Center From South Perspective View - Visitors Center From South Not To Scale 00 JLPlanning - Site & Architectural Review02/25/2015 01 04/20/2015 Planning - Site & Arch. Review Resubmit JL 03 07/01/2015 Planning - Site & Arch. Review Resubmit NM N 01 Not To Scale Key Plan Project No.Date RevisionNumber Title Project Client Rev.Date Reason For Issue Chk. General Notes Do not scale drawings. Dimensions govern.1. All dimensions are in feet and inches unless noted otherwise.2. 3. 4. 5.Any areas indicated on this sheet are approximate and indicative only. Foster + Partners shall be notified in writing of any discrepancies. All dimensions shall be verified on site before proceeding with the work. Scale at ARCH E1 Size PUBLIC LEDGER BUILDING,SUITE 1123 150 SOUTH INDEPENDENCE MALL WEST PHILADELPHIA, PA 19106 TEL 215.440.0030 / FAX 215.440.0041 WWW.THEOLINSTUDIO.COM OLIN PARTNERSHIP, LTD. LANDSCAPE ARCHITECTURE AND URBAN DESIGN Luk and Associates www.lukassociates.com Phone: (510) 7243388 Hercules, CA 94547 738 Alfred Nobel Drive © Foster Partners 2015www.fosterandpartners.com T +1 (408) 610-5800 Cupertino, CA 95014 19050 Pruneridge Avenue Apple, Inc. Apple Campus 2, Phase 1 North Tantau Avenue Site A Visitors Center & Parking 01 2193 02/25/2015 P-VC-6.01 Perspective View Visitors Center From North Perspective View - Visitors Center From North Not To Scale 03 07/01/2015 Planning - Site & Arch. Review Resubmit 3 NM N 01 Not To Scale