Loading...
HomeMy WebLinkAbout06-11-2015CITY OF CUPERTINO AGENDA Thursday, June 11, 2015 Conference Room C ADMINISTRATIVE HEARING 5:00 PM ROLL CALL APPROVAL OF MINUTES 1.Subject: Draft Minutes of May 28, 2015 Recommended Action: approve or modify the Draft Minutes of May 28, 2015 Draft Minutes of May 28, 2015 ORAL COMMUNICATIONS (Reserved for persons wishing to address the Committee or Hearing Officer on issues that are not already included on the regular Order of Business) WRITTEN COMMUNICATIONS PUBLIC HEARING ITEMS 2.Subject: duplex addition Recommended Action: Approve the application per the draft resolution Description: Application No(s): ASA-2015-10 Applicant(s): David Warren (Ng properties) Location: 22372-22374 McClellan Rd APN#356-04-027 Architectural and Site approval to allow a 438 square foot addition to an existing single story duplex The Hearing Officer's decision is final unless appealed Staff Report Draft Resolution Plan Set 3.Subject: new residential construction Page 1 CITY OF CUPERTINO June 11, 2015Administrative Hearing AGENDA Recommended Action: approve the application per the draft resolution Description: Applicantion No(s).: ASA-2015-06 Applicant(s): Depak Chandani (Sinha/Thawani residence) Location: 21891 Granada Ave Architectural and Site approval to allow the construction of a new 3,017 square foot, two-story residence in a Planned Development Zone The Hearing Officer's decision is finalled unless appealed Staff Report Draft Resolution Plan Set OLD BUSINESS NEW BUSINESS ADJOURNMENT If you challenge the action of the Hearing Officer at the Administrative Hearing in court, you may be limited to raising only those issues you or someone else raised at the public meeting described in this notice, or in written correspondence delivered to the City of Cupertino at, or prior to, the meeting. Please note that the policy for oral communication is to allow an applicant and groups to speak for 10 minutes and individuals to speak for 3 minutes. In the event an action taken by the Hearing Officer is deemed objectionable, the matter may be officially appealed to the Planning Commission in writing within fourteen (14) days of the date of the Hearing Officer’s decision. Said appeal is filed with the City Clerk (Ordinance 632). Members of the public are entitled to address the Hearing Officer concerning any item that is described in the notice or agenda for this meeting, before or during consideration of that item. If you wish to address the Hearing Office on any other item not on the agenda, you may do so during the public comment portion of the meeting. Please limit your comments to three (3) minutes or less. In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend the next Administrative Hearing meeting who is visually or hearing impaired or has any disability that needs special assistance should call the City Clerk's Office at 408-777-3223, 48 hours in advance of the meeting to arrange for assistance. Upon request, in advance, by a person with a disability, Administrative Hearing meeting agendas and writings distributed for the meeting that are public records will be made available in the appropriate alternative format. Also upon request, in advance, an assistive listening device can be made available for use during the meeting. Page 2 CITY OF CUPERTINO Administrative Hearing May 28, 2015 Cupertino, CA 95014 (408) 777-3308 ACTIONMINUTES OF THE REGULAR MEETING OF THE ADMINISTRATIVE HEARING HELD ON May 28,2015 ROLL CALL Hearing Officerpresent:Gary Chao, Assist. Director of Community Development Staff present: Kaitie Groeneweg, Assistant Planner Erick Serrano, Assistant Planner Applicant(s)present:Brian Carrera, Agent(NTerra for Apple, Inc.) Neil Woolner, Arborist (Arborwell) Susan Cutler, Project Manager(Apple, Inc.) APPROVAL OF MINUTES: May 14, 2015 The minutes of May 14,2015were approved as written POSTPONEMENTS/REMOVAL FROM CALENDAR: None ORAL COMMUNICATION: None WRITTEN COMMUNICATIONS: None PUBLIC HEARING: 1.Application No.(s): ASA-2015-04, TR-2015-09 Applicant:John Noori(Apple, Inc) Location:19191 Vallco Parkway Architectural and Site approval to allow parking lot improvements and the construction of private, on-site, bus shelters at an office complex; Tree Removal permit to allow the removal and replacement of 102 protected trees to allow for parking lot improvements at an office complex Administrative Hearingdecision final unless appealed. 2 Administrative Hearing May 28, 2015 Staff Member Groenewegexplained that Apple, Inc. has proposed parking lot improvements which include the construction of a bus shelter, pedestrian pathways, re-orienting the parking stalls, ADA upgrades, EV charging stations, trash “trios”, bicycle racks and lockers and new parking lot lighting. Theexisting tennis court will be demolished and replaced with an outdoor seating area for employees. 35 new parking spaces will be created for a site total of 500parking stalls at the completion of the project, which meets exceeds the Parking Ordinance requirements.The custom built bus shelters are outside of setback areas and are meetingthe height requirements. Theapplicant proposes to remove 101trees and transplant 1 tree on the site. They will be replacedwith 112trees, ranging in size from 24”to 60” box. Theywill be a mixture of young and mature trees whichare native and drought tolerant.The trees need removed as they fall within the proposed construction site or are in poor health. Some of the removed trees will be re-purposed on site as benches. The project will be increasing the overall landscaping on site byapproximately 4000 square feet. Staff has received an inquiry regarding the trees on the perimeter of the propertyon Tantau Avenue. Those trees are included in the removal and replanting plan.Staff recommends approval of the project as it conforms to the Parking and Tree Ordinances. Hearing Officer Chao clarified the size of the replanted trees and asked what species of trees would be used. The project Arborist Neil Woolner, stated that the replacement trees would mostly be Oak and native Sycamoretrees. They are drought tolerant and generally long lasting. The Hearing Officer confirmed with him that most of the existing trees are in poor health. A resident, Jennifer Griffin, spoke to her concernsabout the proposed replacement Sycamore tree. The Sycamore tree that was on the property years ago (and had been removed prior to this application) had been a heritage tree and she would like the new tree to be one too. She wanted assurance that the Oak trees along the Calabasas Creek would be remaining and wanted clarification about the Ash trees along Tantau Avenue. The Hearing Officer asked Staff member Groeneweg if she could replyin response to the concerns raised about the Sycamore and Oak trees. Shestated that the Oak trees are located on land belonging to the Santa Clara Valley Water District and as such they are not part of the proposed project. The trees located along Tantau are Oak and Redwood trees and are not included in the removal plan as part of this project either. A majority of the Ash trees located along Vallco Parkway will also be retained. The Hearing Officer asked the project Arborist to talk about the strengths of the proposed replanting plan. He stated that the trees are going to belargeand are a nice mixture of species that are nativeand hearty. The Hearing Officer explained to the resident that the proposed bus shelters are within the project site and are private shelters for the employees. There are no frontage improvements being made to accommodate the public transit system. The Hearing Officer stated that he liked the plan. The site modifications are towards the interior, rear of the building and will make the site much better. The trees will provide appropriate shading. The parking lot and site improvements will greatly enhance the space. DECISION: The applicationswereapprovedby the Hearing Officerper the draft resolutions 3 Administrative Hearing May 28, 2015 2.Application No.(s): ASA-2015-09 Applicant:Susan Cutler(Apple, Inc) Location:1 Infinite Loop Architectural and Site approval to allow façade improvements of approximately 102 linear feet on an office building Administrative Hearing decision final unless appealed. Staff Member Serranoexplained Apple, Inc. has proposed façade improvements to the frontage of building 1 (the public Apple Store) at the Infinite Loop campus. The application also includes a replacement of the existing ground sign. As project meets all of the current Municipal Codes, Staff recommends approval of the project per the draft resolution. The Hearing Officer did not have any questions for staff. The proposed project is pretty straightforward. The applicant also did not have anything to add. A resident, Jennifer Griffin, asked if this application also included any treeremovals. The Hearing Officer told her that it did not. He also let her know that all public hearing items –staff reports, conditions of approvals and decisions are available to the public on the City’s website. DECISION: The applicationwasapproved by the Hearing Officerper the draft resolution ADJOURNMENT Respectfully submitted: /s/Beth Ebben Beth Ebben Administrative Clerk g:planning/AHCommittee/Minutes052815 ADMINISTRATIVE HEARINGSTAFF REPORT Agenda Item No. Agenda Date:June 11, 2015 Application: ASA-2015-10 Applicant:Dave Warren (Ng Properties) Project Location:22372-22374 McClellan Rd. (APN 356-04-027) Application Summary: Architectural and Site Approval (ASA-2015-10) to allow a 438 square foot addition to an existing single story duplex. RECOMMENDATION: Staff recommends that the Hearing Officer:Approve the Architectural and Site Approval (ASA- 2015-10) per the draftresolution. PROJECT DATA: General Plan Designation Residential Low/Medium Density (5-10 DU/Gross Acre) Zoning Designation R2-4.25i (Residential Duplex District, 8,500 square feet minimum lot sizesingle story overlay) Existing/Proposed Use:Residential duplex Lot Size 8,850 square feet (0.2 acres) Allowed/Required Existing Proposed Lot coverage 40% (3,540 s.f.)35% (3,066 s.f.)39% (3,504 s.f.) Height One story, not exceeding 18’ 16’16’(no change) First floor building setbacks Front-20’ Side (combined)-15’; 6’ min. Rear-23’6” Front –20’ Side(combined)- 18’7”; 9’4” each side Rear –36’ Front-20’ (no change) Side (combined) –18’7”; 9’4” each side (no change) Rear-20’1 Project Consistency with: 1May be reduced to 10 feet provided that the required rear-yard setback area is no less than eight hundred fifty square feet or twenty times of the lot width.The proposal meets the required rear yard of 1,500 square feet. OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE •CUPERTINO, CA 95014-3255 (408) 777-3308 • FAX (408) 777-3333 • planning@cupertino.org ASA-2015-10 Addition to Existing Duplex June 11, 2015 Page 2 General Plan Yes Zoning Yes Environmental Review Categorically Exempt per Section 15301, Class 1 (Existing Facilities – Additions to Existing Structures) of California Quality Act (CEQA) BACKGROUND: The subject property is located on the south side of McClellan Roadand currently consists of a duplex residence. To the northand south are single family residences, whileother duplexes are located to the west and east. DISCUSSION: The applicant, Dave Warren, representing the property owner Ng Properties, is proposing a 219 square foot addition to each unit in the existing duplex (combined 438 square feet) to add a bedroom and bathroom. An interior remodel is replacing one of the existing bedroom and bathrooms in each unit with a den, thus the bedroom count is not increasing. Theaddition is harmonious with existing architecture, colors, and materialsof the duplex. According to the R-2 ordinance, all additionsin the R-2 zoning district require Architectural and Site Approval at an Administrative Hearing,in order to assure a high degree of architectural quality and to address other development issues. The project is consistent with the General Plan and the R-2 Ordinance (lot coverage, setbacks, building height). The design of the addition is compatible with the existing structure and the exterior materials for the addition match existing materials. OUTREACH/NOTICING The following table is a brief summary of the noticing done for this project: Notice of Public Meeting & Site Signage Agenda Posted on the site (10 days prior to hearing) ___notices mailed to property owners adjacent to the project site (10 days prior to hearing) Posted on the City's official notice bulletin board (one weekprior to hearing) Posted on the City of Cupertino’s Web site (one weekto hearing) ASA-2015-10 Addition to Existing Duplex June 11, 2015 Page 3 PERMIT STREAMLINING ACT This matter is adjudicatory and is subject to the Permit Streamlining Act (Government Code Section 65920 –65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received: May 13, 2015 Deemed Complete: May 28, 2015 Since this project is Categorically Exempt, the City has60 days (until March23, 2015)to make a decision on the project.The Hearing Officer’s decision on this project is final unless appealed within 14 calendar days of the decision. CONCLUSION Staff recommends approval of the Architectural and Site Approval, since the plans and conditions of approval address all concerns related to the proposed project. Additionally, all of the findingsfor approval of the proposed project, consistent with Chapter 19.168 of the Cupertino Municipal Code, may be madeas reflected in the Draft Resolution. Submittedby:Gian Paolo Martire, AssistantPlanner Reviewed by: Rebecca Tolentino, Senior Planner Attachments DraftResolution Plan Set ASA-2015-10 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRAFT RESOLUTION OF THE ADMINISTRATIVE HEARING MEETINGOF THE CITY OF CUPERTINO FOR AN ARCHITECTURAL ANDSITE APPROVAL OF A438 SQUARE FOOT ADDITION TO AN EXISTING SINGLE STORYDUPLEX LOCATED AT 22372-22374 MCCLELLAN ROAD SECTION I: PROJECT DESCRIPTION Applicant:Dave Warren Property Owner: Ng Properties Location:22372-22374 McClellan Rd. (APN 356-04-027) SECTION II: FINDINGS WHEREAS, the Administrative Hearing Officerof the City of Cupertino received an application to allow an Architectural and Site Approval ofa 438 square foot addition to an existing single story duplex located in an R2-4.25izoning district; WHEREAS, the necessary public notices have been given asrequired by the Procedural Ordinance of the City of Cupertino, and the Hearing Officerhas held at least one public hearing in regard to the application; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officerfinds: 1.The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The applicant is proposing to add 219square feet to eachof the units of an existing duplex in order to add a bedroom and bathroom. The applicant is also proposing to remodel the interior. Since the proposed addition and remodel is located on private property does not conflict with any public easements, and is consistent with applicable code requirements. The project is not detrimental to the public health, safety, general welfare or convenience. 2.The proposal is consistent with the purposes of Chapter 19.168, Architectural and Site Review, of the Cupertino Municipal Code, the General Plan, any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, Draft Resolution ASA-2015-10 June 11, 2015 Page 2 subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a)Abrupt changes in building scale should be avoided.A gradual transition related to height and bulk should be achieved between new and existing buildings; The existing building is 16’and there is no proposed increase in height. Therefore,the proposed addition matches the scale of the existing structure. b)In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new buildings should harmonize with adjacent development by being consistent or compatible with design and color schemes, and,with the future character of the neighborhood and purposes of the zone in which they are situated.The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development.Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed.The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided.Lighting for development should be adequate to meetsafety requirements as specified by the engineering and building departments, and provide shielding to prevent spill-over light to adjoining property owners; and The addition is proposed to have the same building materials and be painted thesameas the existing structure. The project proposes nochanges to the location, height, and materials of walls fencing, hedges and screen planting, and is tobe consistent with the requirements of Cupertino Municipal Code Chapter 19.48: Fences. Exterior lighting other than that expected in residential development is not being proposed. Therefore, there are no spill-over light impacts expected from the development. c)With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures The proposed addition meets the required setbacks of the R-2 Zoning District. Since the addition is a single story addition, the applicant is not required to plant additional screening landscape material. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter,subject to the conditions which are enumerated inSection III and IV ofthis Resolution beginning on Page 3thereof,the Application No. ASA-2015-10is hereby approved; andthat the sub-conclusionsupon which the findings and conditions specified in this Resolution Draft Resolution ASA-2015-10 June 11, 2015 Page 3 are based and contained in the public hearing record concerning Application ASA-2015-10as set forth in the Minutes of the Administrative HearingMeeting of June11, 2015, and are incorporated by referenceas though fully set forthherein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1.APPROVED EXHIBITS Approval is based on the plan set entitled, “Existing Duplex Residential Addition and Remodel for: Mr. & Mrs. Chun H. Ng, 22372-22374 McClellan Road, Cupertino, California 95014” dated April 27, 2015 drawn by David Warrenof T-Sq.Design, consisting of three (3) sheets labeled A-1 through A-3, except as may be amended by conditions in this resolution. 2.ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3.FENCES All fencing shall comply with Cupertino Municipal Code Chapter 19.48: Fences. Any changes to the fencing shall require design review with the Community Development Department. 4.CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 5.EXTERIOR BUILDING MATERIALS/TREATMENTS Final building exterior treatment plan (including but not limited to details on exterior color, material, architectural treatments and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The final building exterior plan shall closely resemble the details shown on the original approved plans. Any exterior changes determined to besubstantial by the Director of Community Development shall require a modification approval with neighborhood input. 6.INDEMNIFICATION To the extent permitted by law, the Applicant shall indemnify and hold harmless the City, its City Council, its officers, employees and agents (the “indemnified parties”) from and against any claim, action, or proceeding brought by a third party against the indemnified parties and the applicant to attack, set aside, or void this ordinance or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the Draft Resolution ASA-2015-10 June 11, 2015 Page 4 City its actual attorneys’ fees and costs incurred in defense of the litigation.The City may, in its sole discretion, elect to defend any such action with attorneys of its choice. 7.NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. PASSED AND ADOPTED this 11th day of June, 2015 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST:APPROVED: Gian Paolo Martire Gary Chao Assistant Planner Asst. Director of Community Development 22374 22372 1 1 1 (E)75'-0" Req'd Rear Yard Area1 1 Not Shown in Lot Coverage Existing and New Overhang, Patio & Porch Square Footage (Total for 22372 & 22374) Existing Overhang Area: 283 New Overhang Area Areas: 136 Existing Patio Area :300 Removed during construciton and New to match Existing Footprint Existing Porch: 80 Total Overhang, Patio & Porch Areas: 799 1 1 1 1 (E ) 2 0 ' - 0 " (E ) 6 2 ' - 0 " (N ) 1 6 ' - 0 " (N ) 2 0 ' - 0 " Re q ' d R e a r Y a r d A r e a (E)&(N)9'-4 " (E) & (N)13'-8"14'-6"14'-6"(E) & (N)13'-8" (E)&(N)9'-4"(E)&(N)28'-2"(E)&(N)28'-2" 1'-0"1'-0" (E)8'-4"(E)20'-2"(E)18'-0"(E)20'-2"(E)8'-4" SITE & EXISTING FLOOR PLAN scale: 1/8" = 1'-0" (E) sidewalk (E) conc. curb & gutter McCLELLAN ROAD (E) conc. driveway (E) landscaping (E) landscaping DRAWING INDEX PROJECT CONSULTANTS: (E) walkway property line (E) utility pole, exist'g point of service to remain (E) landscaping (E) wood fencing (E) 18" tree, to remain, verify location property line 75.00' 11 8 . 0 0 ' 11 8 . 0 0 ' 75.00' (E) 18" tree, to remain. verify location (E)&(N) conc. patio & walkway. (E) 2- gas meters (E) City street light (E) 2- water meters (E) conc. driveway (E) sewer line clean-out (E) landscaping (E) landscaping (E) walkway (E) landscaping (E) wood fencing (E) wood fencing (E) wood gates (E) wood gates 480 sq. ft. (E) Garage Area 1,053 sq. ft. (E) Living Area 1,053 sq. ft. (E) Living Area 480 sq. ft. (E) Garage Area 219 sq. ft. (N) Living Area 219 sq. ft. (N) Living Area (N) conc. walkway (N) ADD ALTERNATE 1 bay window element, see New Floor Plan sht. A-2 See Floor Plan for Inter. Dim's:13.4 sq. ft reserved and include in floor area ratio for a future garage upgrade See Floor Plan for Inter. Dim's:13.4 sq. ft reserved and include in floor area ratio for a future garage upgrade (N) conc. walkway (E)&(N) conc. patio & walkway. NOTE: (E) conc. patio & walkway to be removed during construction. (N) patio to match (E) footprint A r c h i t e c t u r a l D e s i g n & D r a f t i n g S e r v i c e T - S q . D e s i g n 6 1 4 9 G e r o n i m o D r . , S a n J o s e , C a l i f . 9 5 1 2 3 p h o n e & f a x : 1 ( 4 0 8 ) 2 2 5 - 2 5 3 3 D a v i d D . W a r r e n , P r i n c i p a l Date: Drawn By: Job Number: A-1 Sheet Number: 1 of 3 R e v i s i o n s : 1501 April 27, 2015 G E N E R A L N O T E S ; B U I L D I N G S U M M A R Y & S C O P E O F W O R K ; I N D E X T O D R A W I N G S E X I S T I N G a n d N E W S I T E P L A N s c a l e a s n o t e d o n d r a w i n g BUILDING SUMMARY/ SCOPE OF WORK: APN: 356-04-027 Jurisdiction: City of Cupertino Zoning: R-2-4.25i Residential Duplex Cupertino , County of Santa Clara, State of California, Use: Two Family No. of Stories: One Story Occupancy Group: R3 Construction Type: VN Fire Sprinkler System: No Existing Square Footage (Total for 22372 & 22374) Existing Living Area: 2,106 Existing Garage Area: 960 Total Existing Building Area: 3,066 Proposed New Addition Square Footage (Total for 22372 & 22374) New Living Addition Area: 438 New Garage Addition Area (N/A): 0 Total New Addition Area: 438 Proposed Existing and New Addition Square Footage (Total for 22372 & 22374) Existing & New Living Addition Areas: 2,544 Existing Garage Areas: 960 Total Existing & New Addition Areas: 3,504 M r . & M r s . C h u n H . N g 2 2 3 7 2 - 2 2 3 7 4 M c C l e l l a n R o a d , C u p e r t i n o , C a l i f o r n i a 9 5 0 1 4 C o u n t y o f S a n t a C l a r a , A P N : 3 5 6 - 0 4 - 0 2 7 Proposed Net Ratio Calculations A. Lot Size: 8,850 sq. ft. B. Gross duplex/house size (including garage): 3,504 sq. ft. C. Garage reserved Floor Ratio Upgrade:26 sq. ft. D. Total Gross Floor Area (B+C): 3,530 sq. ft. E. Calculate Floor Area Ratio (divide D by A): 0.398 F.A.R. Scope of Work: Construction to include the following to each duplex unit: New Master Bedroom & Master Bathroom ; Remodel Existing Bedroom and Bathroom. As well as all applicable building exterior and interior finishes, windows, doors, cabinetry, plumbing fixtures and utility service necessary to complete the project. GENERAL NOTES 1 Existing Conditions: All information relating to existing conditions is given as being the best information available but without guarantee of accuracy. The general contractor and sub-contractors shall verify all existing conditions and construction. Field measurement responsibility shall be with the general contractor and also with each sub-contractor and measurements shall be made prior to fabrication or construction and all major discrepancies between drawings and field conditions shall be reported to the owner. All existing structures, landscaping, utility services, finishes or materials to remain are to be protected during construction and are the responsibility of the general contractor and sub-contractors to remain in the condition as when construction started or shall be repaired or replaced at no cost to the owner. Patching and rehabilitation is part of this work and where removal of or existing conditions leaves holes or defacement of exposed existing they shall be repaired by appropriate trades. 2.Codes: All work shall be in accordance with applicable editions of governing local, state and national building, fire, mechanical, plumbing, electrical and health codes. ( 2013 California Build'g Code based on IBC 2012 edition; 2013 California Residential Code based on IRC 2012 edition; 2013 California Plumbing Code based on 2012 UPC; 2013 Mechanical Code based on 2012 UMC; 2013 Electrical Code based on 2012 NEC; 2013 California Existing Building Code; 2012 International Existing Building Code; 2008 California Building Energy Efficiency Standards; 2013 California Green Building Standards Code and 2013 California Fire Code based of 2012 IFC) 3 Energy Statement: The modifications to the existing structure are to meet the requirements of the state emergy efficiency standards. 4 Electrical: The General Contractor and Electrical Sub-contractor shall verify existing electrical service and provide proper upgrade for new fixture and appliance requirements. All changes and modifications to the existing service system as well as the new electrical and lighting work to be done in accordance with applicable codes.. All receptacles near water source installed at counter top lines must be of a ground fault interrupter (GFCI) type. Provide separate dedicated circuit as required per equipment, appliance and code requirements. All interior recepticals and switches installed along a exterior wall line shall comply with energy compliance requirements. 5 Mechanical: The Mechanical Sub-contractor shall verify existing Forced Air Heater/ Air Conditioning Mechanical services and equipment. All new work, if applicable, shall be in accordance with applicable codes and requirements and the recommended practices of SMACNA. All new heating, ventilating, air conditioning and water heating equipment shall meet all California State requirements and be certified. New Thermostats, if applicable shall be equipped with an auto setback. New fan systems, if applicable, exhausting air to the outside shall be provided with back-draft dampers. Existing Furnace locations to remain. All new exhaust termination's from dryers and fans must be at least three feet away from openable windows, skylights and attic vents. Flexible air ducts must be installed according to manufactures instructions and must use UL approved tape per UMC 6 Plumbing: It is the intent of this project to utilize and connect new fixtures to the existing supply and drainage lines. The plumbing sub-contractor shall verify existing conditions and provide all new work with proper supply and drainage sizes, types of piping, venting, and plumbing fixture types and models, so as to provide a proper plumbing supply and drainage system. All work shall be in accordance with applicable codes and requirements and the recommended practices of SMACNA. All work shall also be in accordance with the California State requirements for fixtures individual control values of thermostatic mixing or pressure balance and maximum flush and flow capacities.. 7 All Electrical HVAC and Plumbing work shall be done in accordance with the Local Building Code and Standards- by Licensed Contractors. Obtain all Electrical, HVAC and Plumbing Permits before beginning installation. 8 Roof Penetrations: All roof penetrations shall be flashed and caulked watertight and finished to match roofing color. 9 Existing landscaping, plants, shrubs and trees are to be protected during construction. 10 The Building and Grounds shall be kept neat and clean at all times. After completion of the Project and before receiving final payment, the Contractor shall have the Building and Grounds cleaned to the Owners satisfaction. 11 The Drawings shall serve as a guide for the scope of the project; however, they are not complete in every detail. The General Contractor and all Sub-contractors shall provide all necessary labor, materials and equipment required to fully complete the project. 12 Drawing reproduction may be subject to distortion. Contact owner, prior to commencement of work, regarding any dimensions which appear to be missing or in error. 13 The General Contractor alone is responsible for safety. Site review of the construction by the architect, design or engineer is to determine conformance with the plans only. It does not encompass safety procedures nor operations. 14 No guarantee of quality of construction is intended or implied by the architectural documents herein, and the Contractor(s) shall assume full responsibility for any and all construction deficiencies. 15 These documents shall not be considered complete and ready for estimating and construction until a Building Permit has been issued. Issuance of a Building Permit does not relieve the Contractor(s) from responsibility for conforming to all aspects and requirements of the Building Codes. 16 All work connected with this Project shall be done in a professional manner in accordance with the traditionally and legally defined best-accepted practice of each of the Trades involved. These contract documents are intended for use in a negotiated contract and may not specify and define materials and manufacturers. The Contractor shall provide all samples, cuts or examples as needed to assist the Owner or His Agent in making selections, for the purpose of estimating. The Contractor shall use the materials and finished selected by the Owners or in the absence of same, and they shall provide an allowance amount and so structure the cost estimate. All the materials shown in these contract documents shall be itemized and included in said cost estimates. 17 The Contractor shall be responsible for obtaining all necessary permits, licenses and bonds so that construction can commence. Contractor must follow up with the appropriate departments to ensure final permits and certificates of occupancy are awarded to the store. 18 The Contractor shall verify all dimensions prior to construction, reporting to the Designer, Engineer and Owner any errors, omissions or discrepancies. 19 (E) = Existing (N) = New FINISH NOTES : 1.Existing walls and ceilings finish, in remodeled area, to be removed, as noted, and replaced with New, thickness of material based on stud spacing and ceiling member requirements. 2.Provide New thermal insulation at exposed exterior walls, ceiling lines and areas per code requirememnts. 3.Existing windows, as noted, to remain. Provide new windows, as noted, at existing locations. CONVENTIONAL CONSTRUCTION NOTES (where applicable) CC1 This project is designed in accordance with The Conventional Light-Frame Construction Provisions of the 2007 edition of California Building Code and it's latest revisions and specific City adopted amendments. There are no shearwalls. Lateral loads are resisted by “Braced Wall Panels” and/or “Alternate Braced Wall Panels. CC2 All structural wood shall be Douglas Fir Larch or equivalent. The moisture content at time of construction shall not exceed 19% and all shall be grade stamped “S-Dry”. CC3 All ledgers and girders or beams carrying other beams shall be Douglas Fir Larch number 1, unless noted otherwise. CC4 All floor joists and roof rafters shall be Douglas Fir Larch number 2, unless noted otherwise. CC5 All ceiling joists shall be Douglas Fir Larch number 2, unless noted otherwise. CC6 All framing, bracing, nailing, notching, drilling, or boring shall be in accordance with CBC, Conventional Light-Frame Construction Provisions CC7 All fastenings shall be in accordance with CBC applicable Sections. End and edge distances and nail penetrations shall be in accordance CBC applicable Sections. CC8 All foundation plates and sills and sleepers on concrete or masonry slab, which is in contact with earth and sills which rest on concrete or masonry foundations, shall be treated wood or foundation grade redwood marked or branded by an approved agency and shall comply with CBC. CC9 All exposed structural wood shall be wood of natural resistance to decay or treated wood and shall comply with CBC applicable Sections. CC10 All framing connections shall be by positive and direct bearing or by metal (mechanical) connectors as manufactured by Simpson Strong Ties Company or equivalent. The contractor shall be responsible for selecting the appropriate size and configuration of connectors per the series or types called out on notes, plans or details. The highest load carrying capacity connectors shall be selected in case of any conflict between details and notes. E x i s t i n g D u p l e x R e s i d e n t i a l A d d i t i o n a n d R e m o d e l f o r : S t e v e n C . C h u 1 0 6 1 5 J o h n W a y , C u p e r t i n o , C a . 9 5 0 1 4 p h o n e : 1 ( 4 0 8 ) 5 0 5 - 9 9 8 5 P r o f e s s i o n a l E n g i n e e r # 5 2 1 6 0 e x p . D e c . 2 0 1 4 GENERAL NOTES; BUILDING SUMMARY & SCOPE OF WORK; INDEX TO DRAWINGS, CONSULTANT LIST and EXISTING and NEW SITE PLAN EXTERIOR ELEVATIONS EXISTING FLOOR PLAN, NEW FLOOR PLAN ADDITION, and EXISTING & NEW ROOF PLAN A-1 A-2 A-3 FRI Energy Consultants, LLC 21 N. Harrison Ave. Campbell, Calif. 95008 phone: 1(408) 866-1620 fax: 1(408) 866-6832 Steven C. Chu 10615 John Way Cupertino, Ca. 95014 phone: 1(408) 505-9985 Professional Engineer #52160 exp. Dec. 2014 Minor Architectural and Site Approval (ASA) for approval at an Administratice Hearing Mr. & Mrs. Chun H. Ng 22372 - 22374 McClellan Road, Cupertino, California 95014 County of Santa Clara, APN: 356-04-027 Existing Duplex Residential Addition and Remodel for: M i n o r A r c h i t e c t u r a l a n d S i t e A p p r o v a l ( A S A ) (E) overhead elect. service line, to remain (E) overhead elect. service line and 2- main panel/meter to remain (E) ingress and egress driveway cut, to remain (E) ingress and egress driveway cut, to remain 5 / 1 1 / 1 5 P l a n n i n g D i v i s i o n p r e l i m . r e v i e w p i c k u p s a n d r e v i s i o n s CMC Sec. 19.32.060(E) Required Rear Yard Area Not less than 850 sq. ft. or 20 time lot width (20 x 75= 1,500 sq. ft.) Provided 20' x 75' = 1,500 sq. ft. (complies with requirement) (E) tub/shower(E) tub/shower 13'-0" x 10'-9" 13'-0"+- x 13'-3" 13'-0" x 11'-3" 13'-0" x 10'-9" 9'-8"+ x 11'-4" 13"-0" x 11'-3" (E)20'-2"(E)20'-2"(E)18'-0" (E)58'-4" (E ) 2 5 ' - 4 " (E ) 3 6 ' - 8 " (E ) 2 ' - 5 1 / 2 " (E ) 1 1 ' - 1 " (N ) 1 6 ' - 0 " (E ) 6 2 ' - 0 " (E)&(N)14'-6"(E)&(N)14'-6"(E)&(N)13'-8" (E)56'-4" (E)&(N)13'-8" 12 ' - 8 " 36 ' - 8 " 2' - 5 1 / 2 " 11 ' - 1 " 8' - 4 " 2' - 5 1 / 2 " 12 ' - 4 " 62 ' - 0 " 20'-2"20'-2"18'-0" 58'-4" 13'-8"14'-6"14'-6"13'-8" 56'-4" (E ) 2 5 ' - 4 " (E ) 3 6 ' - 8 " (E ) 2 ' - 5 1 / 2 " (E ) 1 1 ' - 1 " (N ) 1 6 ' - 0 " (E ) 6 2 ' - 0 " (N ) 5 ' - 1 0 " (N ) 2 ' - 8 " (N ) 5 ' - 7 " (N ) 2 ' - 5 " (N ) 1 1 ' - 7 1 / 2 " (N ) 1 1 ' - 0 " (E) LIVING RM. (E) KITCHEN (E) GARAGE (E) +36" ctr. w/ base cab. below (N) pole & sh's (E) oven/range w/ microwave & exh. hood above (E) 3 x 6 entry door 80 (N) cem. plas. over met. lath on plywd. sheath'g (N) Main elect. panel & Meter 200 amp service ea. unit M r . & M r s . C h u n H . N g 2 2 3 7 2 - 2 2 3 7 4 M c C l e l l a n R o a d , C u p e r t i n o , C a l i f o r n i a 9 5 0 1 4 C o u n t y o f S a n t a C l a r a , A P N : 3 5 6 - 0 4 - 0 2 7 E x i s t i n g D u p l e x R e s i d e n t i a l A d d i t i o n a n d R e m o d e l f o r : (E) 16 w. x 7 hgt. sectional garage door w/ auto dr. opener 00(E) 16 w. x 7 hgt. sectional garage door w/ auto dr. opener 00 (E) DINING (E) DINING (E) ENTRY (E) HALL (E) CLO. (E) LIVING RM. (E) KITCHEN (N) M. BEDROOM (E) GARAGE (E) BEDROOM 1 (E) WARDROBE (E) ENTRY (E) HALL (N) HALL (E) CLO. (E) LIVING RM. (E) KITCHEN (E) BEDROOM 2 (E) GARAGE (E) BEDROOM 1 (E) BATH (E) WARDROBE (E) WARDROBE (E) LIN. (E) lav. (E) WC (E) 16 w. x 7 hgt. sectional garage door w/ auto dr. opener 00(E) 16 w. x 7 hgt. sectional garage door w/ auto dr. opener 00 (E) WC (E) lav. (E) DINING (E) DINING (E) ENTRY (E) HALL (E) HALL (E) LIN. (E) CLO. (E) CLO. (E) LIVING RM. (E) KITCHEN (E) BEDROOM 2 (E) GARAGE (E) BEDROOM 1 (E) BATH (E) WARDROBE (E) WARDROBE (E) LIN. (E) ENTRY (E) HALL (E) HALL (E) LIN. (E) CLO. (E) CLO. (N) WARDROBE (N) M. BATH (N) WC (N) lav. (E) 3 x 6 entry door 80 8 6 ( N ) 2 x 6 s c w d . d r . (E) pole & sh's (N ) 6 x 6 t e m p . d b l . g l a z e d s l . g l . d o o r 8 0 (E) 8 x 6 temp. dbl. glazed sl. gl. door 80 (E) WARDROBE (E) pole & sh's (E) BEDROOM 1 (N) lav.(N) WC (N) pole & sh's (N) WARDROBE (N) M. BEDROOM (N) DEN (N) DEN (N) pole & sh's (N) WARDROBE (N) lav.(N) WC (N) 5-fix. shelves (N) LINEN (E) walls, cabinets & fixtures to be removed (dotted) (N) 2x6 stud wall line(E) pass-thru and counter line (E) oven/range w/ microwave & exh. hood above (E) +36" ctr. w/ base cab. below (N) lav.(N) WC (E) walls, cabinets & fixtures to be removed (dotted) (N) 2x6 stud wall line (E) 8 x 6 temp. dbl. glazed sl. gl. door 80 (N ) 6 x 6 t e m p . d b l . g l a z e d s l . g l . d o o r 8 0 (N) 5-fix. shelves (N) cem. plas. over met. lath on plywd. sheath'g (N) therm. exter. wall insulation (N) therm. exter. wall insulation(N) sht. met. gutter & downspouts to match (E) design & profile, verify (E) 2 x 6 self closing rated door 88(E) 2 x 6 self closing rated door 88 (E) pocket dr. to be removed & infill (N) framing and wall finish to match (E) (N) ADD ALTERNATE 1 bay window element, see New Floor Plan sht. A-2 A r c h i t e c t u r a l D e s i g n & D r a f t i n g S e r v i c e T - S q . D e s i g n 6 1 4 9 G e r o n i m o D r . , S a n J o s e , C a l i f . 9 5 1 2 3 p h o n e & f a x : 1 ( 4 0 8 ) 2 2 5 - 2 5 3 3 D a v i d D . W a r r e n , P r i n c i p a l Date: Drawn By: Job Number: A-2 Sheet Number: 2 of 3 R e v i s i o n s : E X I S T I N G F L O O R P L A N N E W F L O O R P L A N A D D I T I O N a n d E X I S T I N G & N E W R O O F P L A N s c a l e a s n o t e d o n d r a w i n g S t e v e n C . C h u 1 0 6 1 5 J o h n W a y , C u p e r t i n o , C a . 9 5 0 1 4 p h o n e : 1 ( 4 0 8 ) 5 0 5 - 9 9 8 5 P r o f e s s i o n a l E n g i n e e r # 5 2 1 6 0 e x p . D e c . 2 0 1 4 (E) refrig. (E) dw(E) sink NEW FLOOR PLAN scale: 1/4" = 1'-0" (N) shower w/ tile floor, wall surround & 2 temp dr. & enclosure glazing 2 (E ) r i d g e (N ) r i d g e (N) v a l l e y (E) fireplace chimneys w/ spark arresters provide (N) galv. sht. met. step flash'g and crickets (N) eyebrow roof vents, typ. (E) gable vents (E) overhead elect. service line, to (E) location (E) to utility pole ( N ) v a l l e y (E) water heater, to remain BTU 38,000, Man. date Nov. 2014 RHEEM Performance Platinum M47141713 on +18" elevated 1 hr. platform (E) CARRIER Series 151 high-efficiency 58RAV070.08 69,000 BTU Input 56,000 BTU Output furnance, to remain (E) 22"x30" attic access location (N) exter. wall line, below (N) eave vents, typ. (N) gutter to match (E) (N) ds to grade (N) range exhaust vents w/ rain caps at (E) location (E) 4 1/2 / 12 roof slope, verify(E) satellite t.v. dish (N) gutter to match (E) (N) ds to grade (E) gutter (E) ds washer dryer EXISTING FLOOR PLAN scale: 1/8" = 1'-0" EXISTING and NEW ROOF PLAN scale: 1/8" = 1'-0" (E)&(N)9'-6"(E)5'-0"(E)5'-0"(E)&(N)9'-6" (N ) 1 2 ' - 1 " o p e n i n g (E) fireplace (E) fireplace (N ) 5 ' - 1 0 " (N ) 1 3 ' - 8 " (N ) 5 ' - 7 " (N ) 2 ' - 5 " (N ) 1 1 ' - 7 1 / 2 " (E) & (N)10'-1 1/2" ( N ) t u b / s h o w e r 6 0 " x 3 2 " w / t i l e 3 w a l l s ( N ) t u b / s h o w e r (E) sink (E) dw (E) refrig. ( N ) t u b / s h o w e r 6 0 " x 3 2 " w / t i l e 3 w a l l s (E) & (N) 3'-3" (E) & (N)10'-1 1/2"(E) & (N) 3'-3" (N) LINEN (E ) r i d g e ( N ) r i d g e furnace & water heater exhaust vents w/ rain caps verify (E) location (N) to match (E) 4 1/2 / 12 roof slope, verify (N) h i p (N) h i p ( N ) h i p ( N ) h i p (E) ridge (E) h i p ( E ) h i p (E) h i p ( E ) h i p (E) v a l l e y ( E ) v a l l e y (N) eyebrow roof vents, typ. (E) h i p ( E ) h i p (E) 4 1/2 / 12 roof slope, verify (E) gable vents (E ) g a b l e (E ) g a b l e (E) skylight tube (E) skylight tubes (E) skylight tube (N) eyebrow roof vents, typ. (N) rainwater diverter at (E) location (N) to match (E) 4 1/2 / 12 roof slope, verify (N) eave overhang to align with (E), verify (E) gutter (E) ds (N) overhang to match (E) (N) overhang to match (E) (N) overhang to match (E) (E) exter. wall line, below (E) exter. wall line, below furnace & water heater exhaust vents w/ rain caps verify (E) location (E) exter. wall line, below (E) exter. wall line, below (N) eyebrow roof vents, typ. (N) eyebrow roof vents, typ. (N) eave vents, typ. (E) exter. conc. curb'g to 24"x18" under floor access location (E) exter. conc. curb'g to 24"x18" under floor access l ocation (E) 22"x30" attic access location (N) Class B asphalt comp. shingles, radiant barrier, 30 lbs. roof felt over 1/2" CDX plywod. roof sheathing w/ 8d @ 6" o.c EN & 12" FN w/ flat 2x4 or H clips @ 24" o.c. (E) exter. wall line, below A D D A L T E R N A T E 1 Remove (E) wood shake roofing and provide (N) per NOTE A Remove (E) wood shake roofing and provide (N) per NOTE A Remove (E) wood shake roofing and provide (N) per NOTE A Remove (E) wood shake roofing and provide (N) per NOTE A (N) roofing per NOTE A (N) roofing per NOTE A (N ) 2 x 6 s c w d . d r . 8 6 ( N ) 2 x 6 p o c k e t w d . d r . 8 6 8 6 (E ) 2 x 6 w d . d r . B A S E B I D 8 6 ( N ) 2 x 6 s c w d . d r . 84(N) 2 x 6 hc pocket dr. 1/2" undercut (N) 8 pr. x full hgt. sliding doors 0 (E) sliding wardrobe doors to remain (N ) 5 w . x 4 h g t . d b l . g l a z e d s l i d i n g w i n d o w . 0 0 remove (E) window & relocate (N ) 3 w . x 2 h g t . d b l . g l . , s l i d ' g o b s c u r e w i n d o w . 0 0 (E ) 6 w . x 4 h g t . d b l . g l a z e d s l i d i n g w i n d o w , t o r e m a i n 0 0 (E ) 6 w . x 4 h g t . d b l . g l a z e d s l i d i n g w i n d o w , t o r e m a i n 0 0 (E) sliding wardrobe doors to remain (N ) 5 w . x 4 h g t . d b l . g l a z e d s l i d i n g w i n d o w . 0 0 remove (E) window & relocate relocated (E) window ( E ) 3 w . x 2 h g t . d b l . g l . , s l i d ' g o b s c u r e w i n d o w . 0 0 ( N ) 3 w . x 2 h g t . d b l . g l . , s l i d ' g o b s c u r e w i n d o w . 0 0 84(N) 2 x 6 hc wd. dr. 1/2" undercut (N) 8 pr. x full hgt. sliding doors 0 relocated (E) 6 w. x 4 hgt. dbl. glazed sliding window. 00 relocated (E) window relocate (E) window relocated (E) 6 w. x 4 hgt. dbl. glazed sliding window. 00 (N) 5 pr. x full hgt. sliding doors 0 84(N) 2 x 6 hc wd. dr. 1/2" undercut 84(N) 2 x 6 hc wd. dr. 1/2" undercut ( E ) 3 w . x 2 h g t . d b l . g l . , s l i d ' g o b s c u r e w i n d o w . 0 0 86(N) 2 x 6 hc pocket dr. (E) wd. door ( E ) p o c k e t w d . d o o r (E) wd. door (E) wd. door ( N ) d b l . g l . b a y w i n d o w , w / 5 w . x 4 h g t . s l i d ' g c e n t e r u n i t & 1 x 4 h g t . f i x e d u n i t s e a . s i d e . 30° 1'-0" 0 0 0 0 3' - 0 " 5' - 0 " 20 ' - 2 " i n t e r i o r d i m e n s i o n co n f o r m i n g r e q u i r e m e n t 19'-4" interior dimension remain non-conforming 13.4 sq. ft. reserved for a future garage upgrade 20 ' - 2 " i n t e r i o r d i m e n s i o n co n f o r m i n g r e q u i r e m e n t 19'-4" interior dimension remain non-conforming 13.4 sq. ft. reserved for a future garage upgrade 1 5 / 1 1 / 1 5 P l a n n i n g D i v i s i o n p r e l i m . r e v i e w p i c k u p s a n d r e v i s i o n s M i n o r A r c h i t e c t u r a l a n d S i t e A p p r o v a l ( A S A ) 1404 April 27, 2015 1 A-3 2 A-3 5 A-3 6 A-3 3 A-3 4 A-3A-3 4A M r . & M r s . C h u n H . N g 2 2 3 7 2 - 2 2 3 7 4 M c C l e l l a n R o a d , C u p e r t i n o , C a l i f o r n i a 9 5 0 1 4 C o u n t y o f S a n t a C l a r a , A P N : 3 5 6 - 0 4 - 0 2 7 E x i s t i n g D u p l e x R e s i d e n t i a l A d d i t i o n a n d R e m o d e l f o r : (N) gutter & downspout (N) Main elect. panel & Meter 200 amp service (N) dbl. gl. sliding windows (E) conc. driveway (E) sectional roll-up garage dr. with auto. opener (N) exter. cem plaster w/ met trim, weep screed & corner reinf. finish to match existing, typ. (E) conc. step (N) provide smooth transition between (E) and (N) cement plaster surfaces. (E) sectional roll-up garage dr. with auto. opener (N) provide smooth transition between (E) and (N) cement plaster surfaces. (E) conc. driveway (N) conc. step (E) dbl. gl. sliding windows (E) dbl. gl. sliding windows (N) dbl. gl. sliding window (N) dbl. gl. sliding windows w/ wd. trim (E) brick veneer (N) asphalt shingle roofing approx. grade line (N) exter. cem. plaster w/ weep screed , met. trim & corner reinf. typ. (N) gutter and downspout (E) 2x wd. gable fascia trim (E) conc. walkway (N) asphalt shingle roofing approx. grade line approx. grade line (E) brick veneer (E) wd. board & batten siding (N) gutter & downspout (N) exter. cem plaster w/ met trim, weep screed & corner reinf. finish to match existing, typ. (N) gutter and downspout (N) asphalt shingle roofing (N) crawl space vents (E) crawl space vents (N) crawl space vents approx. grade line (N) crawl space vents (N) gutter & downspout (E) fnd. vents (E) fnd. vents (N) dbl. gl. sliding windows (N) gutter & downspout (N) exter. cem. plaster w/ weep screed , met. trim & corner reinf. typ. (N) crawl space vents (E) cement plaster (E) 2x wd. gable fascia trim (E) brick veneer (E) wd. board & batten siding (N) gutter & downspout (N) asphalt shingle roofing (N) Main elect. panel & Meter 200 amp service (N) provide smooth transition between (E) and (N) cement plaster surfaces. (E) dbl. gl. sliding windows (N) dbl. gl. sliding window (N) crawl space vents (N) exter. cem. plaster w/ weep screed , met. trim & corner reinf. typ. A r c h i t e c t u r a l D e s i g n & D r a f t i n g S e r v i c e T - S q . D e s i g n 6 1 4 9 G e r o n i m o D r . , S a n J o s e , C a l i f . 9 5 1 2 3 p h o n e & f a x : 1 ( 4 0 8 ) 2 2 5 - 2 5 3 3 D a v i d D . W a r r e n , P r i n c i p a l Date: Drawn By: Job Number: A-3 Sheet Number: 3 of 3 R e v i s i o n s : E X T E R I O R E L E V A T I O N S s c a l e a s n o t e d o n d r a w i n g (E) overhead elect. service line, to (E) location (E) to utility pole EAST ELEVATION WEST ELEVATION (E) gable vent (N) dbl. glazed, temp. sliding door (N) top plate (N) gutter & ds (N) eyebrow roof vents, typ. (N) eyebrow roof vents, typ. (E) skylight tubes (E) exter. conc. curb'g to 24"x18" under floor access location (N) dbl. glazed, temp. sliding door (E) exter. conc. curb'g to 24"x18" under floor access location (N) eyebrow roof vents, typ. (N) eyebrow roof vents, typ. (E) skylight tubes (E) fireplace chimneys w/ spark arresters provide (N) galv. sht. met. step flash'g and crickets (N) eyebrow roof vents, typ. (E) gable vent (N) eyebrow roof vents, typ. NORTH ELEVATION SOUTH ELEVATIONCOURT WEST ELEVATION COURT EAST ELEVATION scale: 1/4" = 1'-0" scale: 1/4" = 1'-0" scale: 1/4" = 1'-0" scale: 1/4" = 1'-0" scale: 1/4" = 1'-0" scale: 1/4" = 1'-0" (E) overhead elect. service line, to (E) location (E) exter. conc. curb'g to 24"x18" under floor access location WEST ELEVATION - AT ADD ALTERNATE 1 scale: 1/4" = 1'-0" 1 5 / 1 1 / 1 5 P l a n n i n g D i v i s i o n p r e l i m . r e v i e w p i c k u p s a n d r e v i s i o n s M i n o r A r c h i t e c t u r a l a n d S i t e A p p r o v a l ( A S A ) 1' - 2 " (N ) & ( E ) 8 ' - 1 " (N ) 3 ' - 1 " v e r i f y (E ) 1 6 ' - 0 " v e r i f y 1' - 2 " (N ) & ( E ) 8 ' - 1 " (N ) 3 ' - 1 " v e r i f y (N) dbl. gl. bay window, w/ 5 w. x 4 hgt. slid'g center unit & 1 x 4 hgt. fixed units ea. side. 00 00 1404 April 27, 2015 1 A-3 2 A-3 3 A-3 4 A-3 5 A-3 6 A-3 4A A-3 S t e v e n C . C h u 1 0 6 1 5 J o h n W a y , C u p e r t i n o , C a . 9 5 0 1 4 p h o n e : 1 ( 4 0 8 ) 5 0 5 - 9 9 8 5 P r o f e s s i o n a l E n g i n e e r # 5 2 1 6 0 e x p . D e c . 2 0 1 4 (E) & (N) top plate (E) & (N) floor line (N) ridge line approx. grade line (E) ridge line (N) patio 12 4 1/2 (N) verify 12 4 1/2 (E) verify (E) & (N) top plate (E) ridge line 12 4 1/2 (E) verify 12 4 1/2 (E) verify 12 4 1/2 (E) verify 12 4 1/2 (N) verify 12 4 1/2 (E) verify12 4 1/2 (N) verify (E) & (N) top plate (N) ridge line (E gable (E) ridge line (E) & (N) floor line (E) sl. gl. dr. (dbl. pane) (E) & (N) top plate (E) & (N) floor line (N) ridge line approx. grade line (E) ridge line 12 4 1/2 (E) verify (E) & (N) floor line (N) ridge line (E) ridge line 12 4 1/2 (E) verify (E) & (N) top plate (E) & (N) floor line approx. grade line ADMINISTRATIVE HEARINGSTAFF REPORT Agenda Item No. Agenda Date:June 11, 2015 Application: ASA-2015-06 Applicant:Deepak Chandani(Sinha/Thawani Residence) Project Location:21891 Granada Avenue(APN 357-16-156) APPLICATION SUMMARY Architectural and Site Approval(ASA-2015-06)to allow the construction of a new 3,017 square foot, two-story single-family residence in a Planned Development Zone. RECOMMENDATION Staff recommends that the Hearing Officer approvethe Architectural and Site Approval (ASA- 2015-06) per the draft resolution. PROJECT DATA: General Plan Designation Residential (4.4-12 DU/Acre) Zoning Designation P (Res 4.4-12) Existing/Proposed Land Use Single Family home Lot Size 6,714 square feet (0.15 acres) Allowed/Required Proposed F.A.R. (max. 45%)3,021 (3,017) 44.93% Lot Coverage (max. 45%+5%for eavesand covered patios)3,357 (2,465) 36.71% 1st Floor Setbacks (corner lot) Front & Rear 20’20’ Street Side 12’17’ Interior Side 5’5’ 2nd Floor Setbacks (corner lot) Front & Rear 25’25’/28’-6” Street Side 12’23’ Interior Side 10’ with Design Review or 15’ with Two-Story permit 20’-6” OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE •CUPERTINO, CA 95014-3255 (408) 777-3308 • FAX (408) 777-3333 • planning@cupertino.org ASA-2015-06 21891 Granada Avenue June 11, 2015 Page 2 BACKGROUND The proposed project is located at the northeast corner of the intersection of Granada Avenue and Minaker Courtin the Monta Vista Neighborhood. The project is located in a residential neighborhood with single family and small lot single family residences zoned with various designations. To the westand north are planned development single- family residences zoned P(R1),to the northwest are single-family cluster residences zoned R1C, to the south are single-family residenceszoned R1-7.5, and to the east are planned development residential small lot residences zoned P(Res 4.4-12). The project is located on the southern lot of a two-lot subdivision approved by the Planning Commission. The 2006 decision approved the creation of two parcels and the construction of a two-story single family residence with a reduced rear yard setback on the northern lot (U-2006-12, ASA-2006-21, and TM-2006-11). DISCUSSION The applicant, Deepak Chandani, representing the property owner Sharad Sinha and Darpan Thawaniis proposing a new 3,017 square foot single-family residenceto replace an existing 2,334square foot home on the property.According to the Municipal Code Chapter 19.12, a new single family homein the Planned Development zoning district requires Architectural and Site Approval by the Director of Community Development or his/her designee at an Administrative Hearing in order to assure a high degree of architectural quality and to address other development issues. The proposal for a new two story home is architecturally consistent with the other homes on surroundingproperties. The proposed home has adequate parking and has setbacks and materials that are consistent with surrounding properties with similar use. Therefore, the Second to First Floor Ratio > 66% with Design Reviewor ≤66% with Two-story permit 43.94% Total Building Height Max. 28’24’ Parking Required 4 total (2 enclosed & 2 open 20’ by 20’ spaces) 4 (2 in 20’ by 20’ enclosed garage &2open) Project Consistency with: General Plan Yes Specific Plan Yes Environmental Review Categorically Exempt per Section 15303, Class 3 of the California Environmental Quality Act (CEQA) SITE VICINITY AERIAL M IN AK E R C T BYRNE AVE BYRNE CT GRANADA AVE STEVENS CREEK BLVD ASA-2015-06 21891 Granada Avenue June 11, 2015 Page 3 proposal is harmonious in scale, architectural style, colors, and materials choice to the surrounding properties. In addition, the proposalacknowledges potential privacy impacts by proposingsecond story windows that meet the requirements of the R1 zoningdistrict for privacy protection. Where second story windows do not meet theR1standards for privacy protection, the applicant is providing privacy protection through planting materials consistent with the approved privacy screening materials list. Theproposedsingle-family residence will not be detrimental or injurious to property or improvements in the surrounding area and will not be detrimental to the public health, safety, general welfare, or convenience.The project is consistent withthe General Plan and the underlying zoning standards ofR-1Ordinance (i.e. lot coverage, setbacks, building height, privacy mitigation measuresetc.) since a single family home is being proposed. OUTREACH/NOTICING The following table is a brief summary of the noticing done for this project: Notice of Public Meeting & Site Signage Agenda Posted on the site (10 days prior to hearing) 12notices mailed to property owners adjacent to the project site (10 days prior to hearing) Posted on the City's official notice bulletin board (one weekprior to hearing) Posted on the City of Cupertino’s Web site (one weekprior to hearing) PERMIT STREAMLINING ACT This matter is adjudicatory and is subject to the Permit Streamlining Act (Government Code Section 65920 –65964). The City has complied with the deadlines found in the Permit Streamlining Act. Project Received: February 25, 2015; Deemed Incomplete: March 25, 2015 Project Resubmittal: April 19, 2015; Deemed Incomplete: April 20, 2015 Project Resubmittal: May 27, 2015; Deemed Complete: May 28, 2015 Since this project is Categorically Exempt, the City has 60 days (until July 28, 2015) to make a decision on the project. The Hearing Officer’s decision on this project is final unless appealed within 14 calendar days of the decision. CONCLUSION Staff recommends approval of the Architectural and Site Approval, since the plans and conditions of approval address all concerns related to the proposedproject. Additionally, all of the findingsfor approval of the proposed project, consistent with Chapter 19.168 of the Cupertino Municipal Code, may be madeas reflected in the Draft Resolution. Submittedby:EllenYau, AssistantPlanner Reviewed by: Piu Ghosh, Senior Planner ASA-2015-06 21891 Granada Avenue June 11, 2015 Page 4 Attachments DraftResolution Plan Set ASA-2015-06 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRAFT RESOLUTION OF THE ADMINISTRATIVE HEARING MEETINGOF THE CITY OF CUPERTINO FOR AN ARCHITECTURALAND SITE APPROVALTO ALLOW THE CONSTRUCTION OF A NEW 3,017 SQUARE FOOT, TWO-STORY SINGLE-FAMILY RESIDENCE IN A PLANNED DEVELOPMENT ZONE SECTION I: PROJECT DESCRIPTION Applicant:Deepak Chandani Property Owner: Sharad Sinha and Darpan Thawani Location:21891 Granada Avenue (APN 357-16-156) SECTION II: FINDINGS WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an application to allow an Architectural and Site Approval to allow the construction of a new 3,017 square foot, two-story single-family residence in a planned development zone; WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the Administrative Hearing Officerhas held at least one public meeting in regard to the application; and WHEREAS, the applicant has met the burden of proof required to support said application; and WHEREAS, the Administrative Hearing Officerfinds: 1.The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental tothe public health, safety, general welfare, or convenience; The applicant is proposing a new two story single-family residence on property that has an existing single-family home and is also proposing setbacks, parking totals, and building height consistent with the surrounding properties and uses. The project is not detrimental to the public health, safety, general welfare or convenience. 2.The proposal is consistent with the purposes of Chapter 19.168, Architectural and Site Review, of the Cupertino Municipal Code, the General Plan, any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: Draft Resolution ASA-2015-06 June 11, 2015 Page 2 a)Abrupt changes in building scale should be avoided.A gradual transition related to height and bulk should be achieved between new and existing buildings; The proposed structure will replace an existing single story home therefore there will be an increase in the height of the new building. However, most of the properties surrounding the subject site have existing two story homes. Therefore, the new proposal will not cause any abrupt changes in building scale with the neighboring properties. The proposed home itself is aesthetically designed and avoids abrupt changes in scale.Therefore, the proposed residencematchesthe scale of the existing neighborhood pattern. b)In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new buildings should harmonize with adjacent development by being consistent or compatible with design and color schemes, and,with the future character of the neighborhood and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided.Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments, and provide shielding to prevent spill-over light to adjoining property owners; The proposed architectural design, materials choice, and other exterior treatments are compatible with the character and future character of the neighborhood. Location of fencing and landscaping are situated within required setbacks, beyond visibility clearancesand are harmonious with the residential use. Theproposal has been designed to meet the R1 Single Family Residence Ordinance and does not propose to locate unsightly storage, utility units, and or parking lots visible to the public right-of-way. The proposed lighting is limited to residential use and will minimize spill-over light uncommon in residential neighborhoods. c)The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures shall minimize traffic hazards and shall positively affect the general appearance of the neighborhood and harmonize with adjacent development; and No signage or outdoor advertising is proposed by the project. d)With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. The project is located within an existing residential neighborhood and the proposed home has been designed to respect the privacy of the neighbors. The proposal meets the requirements stipulated in the R1 Single Family Residence Ordinance in order to provide the same level of privacy for the neighbors Draft Resolution ASA-2015-06 June 11, 2015 Page 3 as in Single Family Zoning Districts by having sill heights of windows on the second floor either above 5 feet or having fixed obscure windows or planting privacy trees to provide screening to the neighbors. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated inSection III, IVand V ofthis Resolution beginning on Page 3 thereof,the Application No. ASA-2015-06is hereby approved; andthat the sub-conclusionsupon which the findings and conditions specified in this Resolution are based and contained in the public hearing record concerning Application ASA-2015-06as set forth in the Minutes of the Administrative HearingMeeting of June11, 2015, and are incorporated by referenceas though fully set forthherein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1.APPROVED EXHIBITS Approval is based on the plan set entitled, “Proposed Single Family House for Anthem Green Developers, Inc.”, consisting of twelve(12) sheets labeled1-10, and L1-L2, dated May 27, 2015,except as may be amended by conditions in this resolution. 2.ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3.CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 4.EXTERIOR BUILDING MATERIALS/TREATMENTS Final building exterior treatment plan (including but not limited to details on exterior color, material, architectural treatments and/or embellishments)shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The final building exterior plan shall closely resemble the details shown on the original approved plans. Any exterior changes determined to be substantial by the Director of Community Development shall require a modification approval with neighborhood input. 5.PRIVACY PROTECTION The final privacy-planting plan shall be reviewed and approved by the Planning Division prior to issuance of building permits. The variety, size, planting distance shall be consistent with the City’s requirements. Draft Resolution ASA-2015-06 June 11, 2015 Page 4 6.PRIVACY PROTECTION COVENANT The property owner shall record a covenant on this property to inform future property owners of the privacy protection measures and tree protection requirements consistent with the requirements of the R-1 Ordinance, for all windows with views into neighboring yards and a sill height that is 5 feet or less from the second story finished floor.The precise language will be subject to approval by the Director of Community Development.Proof of recordation must be submitted to the Community Development Department prior to final occupancy of the residence. 7.LANDSCAPE PROJECT SUBMITTAL Prior to issuance of building permits, the applicant shall submit a full landscape project submittal per sections 14.15.040 A, B, C, and D of the Landscaping Ordinance if more than 2,500 square feet of landscaping area is proposed. The Water-Efficient Design Checklist (Appendix A of Chapter 14.15), Landscapeand Irrigation Design Plans, and Water Budget Calculations shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits. 8.INDEMNIFICATION Except as otherwise prohibitedby law, the applicant shall indemnify and hold harmless the City, its City Council,andits officers, employees and agents (collectively,the “indemnified parties”) from and against any claim, action, or proceeding brought by a third party againstone or more of theindemnified partiesor one or more of the indemnified partiesand the applicant to attack, set aside, or void this Resolution or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actualattorneys’ fees and costs incurred in defense of the litigation. Theapplicant shall paysuch attorneys’ fees and costswithin 30 daysfollowingreceipt of invoices from City. Suchattorneys’ fees and costsshall include amountspaid to counsel not otherwise employed as City staff and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. 9.NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant toGovernment Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. Draft Resolution ASA-2015-06 June 11, 2015 Page 5 SECTION IV: CONDITIONS ADMINSTERED BY THE PUBLIC WORKS DEPARTMENT 10.CURB AND GUTTER IMPROVEMENTS Curbs and gutters, sidewalks and related structures shall be installed in accordance with grades and standards as specified by the City Engineer. 11.GRADING Grading shall be as approved and required by the City Engineer in accordance with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits maybe required. Please contact Army Corp of Engineers and/or Regional Water Quality Control Board as appropriate. 12.UNDERGROUNDUTILITIES Developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate with affected utility providers for installation of underground utility devices. Developer shallsubmit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the City Engineer. 13.WATER BACKFLOW PREVENTERS Domestic and Fire Water Backflow preventers and similar above ground equipment shall be placed away from the public right of way and site driveways to a location approved by the Cupertino Planning Department, Santa Clara County Fire Department and the water company. 14.BEST MANAGEMENTPRACTICES Utilize Best Management Practices (BMPs), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in grading and street improvement plans. 15.EROSION CONTROL PLAN Developer shall provide an approved erosion control plan by a Registered Civil Engineer. This plan should include all erosion control measures used to retain materials on site. Erosion control notes shall be stated on the plans. 16.WORK SCHEDULE Every 6 months, the developer shall submit a work schedule to the City to show the timetable for all grading/erosion control work in conjunction with this project. 17.STREET TREES Street trees shall be planted within the Public Right of Way to the satisfaction of the City Engineer and shall be of a type approved by the City in accordance with Ordinance No. 125. Draft Resolution ASA-2015-06 June 11, 2015 Page 6 18.DEDICATION OF UNDERGROUND WATER RIGHTS Developer shall “quit claim” to the City all rights to pump, take or otherwise extract water from the underground basin or any underground strata in the Santa Clara Valley. 19.SAN JOSE WATER COMPANY CLEARANCE Provide San Jose Water Company approval for water connection, service capability and location and layout of water lines and backflow preventers before issuance of a building permit approval. 20.SANITARY DISTRICT A letter of clearance for the project shall be obtained from the Cupertino Sanitary District prior to issuance of building permits. SECTION V: CONDITIONS ADMINSTERED BY THE FIRE DEPARTMENT 21.REVIEW Review of this Developmental proposal is limited to acceptability of site access and water supplyas they pertain to fire department operations, and shall not be construed as a substitute for formal plan review to determine compliance with adopted model codes. Prior to performing any work the applicant shall make application to, and receive from, the Building Department all applicable construction permits. 22.FIRE SPRINKLERS REQUIRED An automatic residential fire sprinkler system shall be installed in one-and two-family dwellingsasfollows: in all new one-and two-family dwellings and in existing one-and two-family dwellings when additions are made that increase the building area to more than 3,600 square feet. The owner(s), occupant(s) and any contractor(s) or subcontractor(s) are responsible for consulting with the water purveyor of record in order to determine if any modification or upgrade of the existing water service is required. A State of California licensed (C-16) Fire Protection Contractor shall submit plans, calculations,a completed permit application and appropriate fees to this department for review and approval prior to beginning their work. 23.WATER SUPPLY REQUIREMENTS Potable water supplies shall be protectedfrom contamination caused by fire protection water supplies.It is the responsibility of the applicant and any contractors and subcontractors to contact the water purveyor supplying the site of such project, and to comply with the requirements of that purveyor. Such requirements shall be incorporated into the design of any water-based fire protection systems, and/or fire suppression water supply systems or storage containers that may be physicallyconnected in any manner to an appliancecapable of causing contamination of the potable water supply of the purveyor record. Final approval of the system(s) under consideration will not be granted by this office until compliance with the requirements of the water purveyor of record are documented by that purveyor as having been met by the applicant(s). Draft Resolution ASA-2015-06 June 11, 2015 Page 7 24.CONSTRUCTION SITE FIRE SAFETY All construction sites must comply with applicable provisions of the CFC Chapter 33 and Standard Detail and Specification SI-7. Provide appropriate notations on subsequent plan submittals, as appropriate to the project. 25.ADDRESS IDENTIFICATION New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall be a minimum of 4 inches (101.6 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). PASSED AND ADOPTED this 11th day of June, 2015 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST:APPROVED: Ellen Yau Gary Chao Assistant Planner Asst. Director of Community Development Anthem Green Developers, Inc. 21891 Granada Avenue Proposed Single Family House Cupertino, California For APN No.: 357-16-156 /+ 0 # - ' 4  % 1 7 4 6 )4#0#&##8'07' /+ 0 # - ' 4  % 1 7 4 6 )4#0#&##8'07' GENERAL NOTES: 1.ALL WORK SHALL BE IN ACCORDANCE WITH THE STATE OF CALIFORNIA-DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS (LATEST EDITION, AS AMENDED) AND STANDARD PLANS (LATEST EDITION, AS AMENDED) AND CITY OF CUPERTINO STANDARD DETAILS. THE CONTRACTOR SHALL PERFORM THE WORK DESCRIBED IN THE SPECIFICATIONS, AND AS SHOWN ON THE DRAWINGS, AND TO THE SATISFACTION OF THE CITY ENGINEER. 2.APPROVAL OF THESE PLANS SHALL NOT RELEASE THE OWNER OR CONTRACTOR OF THE RESPONSIBILITY FOR CORRECTIONS OR MISTAKES, ERRORS, OR OMISSIONS CONTAINED THEREIN. IF DURING THE COURSE OF CONSTRUCTION OF IMPROVEMENTS, PUBLIC INTEREST REQUIRES A MODIFICATION OF/ OR A DEPARTURE FROM CITY OF CUPERTINO STANDARD DETAILS OR THESE IMPROVEMENT PLANS, THE CITY ENGINEER SHALL HAVE THE AUTHORITY TO REQUIRE SUCH MODIFICATIONS OR DEPARTURE AND TO SPECIFY THE MANNER IN WHICH THE SAME IS TO BE COMPLETED, AT THE SOLE EXPENSE OF THE OWNER OR CONTRACTOR. 3.THE CONTRACTOR SHALL NOTIFY THE CITY OF CUPERTINO PUBLIC WORKS INSPECTOR TWO WORKING DAYS PRIOR TO REQUIRING AN INSPECTION. CALL 408-777-3104 TO SCHEDULE PUBLIC WORKS INSPECTIONS. 4.ALL PUBLIC IMPROVEMENTS SHALL BE COMPLETED PRIOR TO OCCUPANCY. 5.CONTRACTOR IS RESPONSIBLE FOR DUST CONTROL AND ENSURING THE AREA ADJACENT TO THE WORK IS LEFT IN A CLEAN CONDITION. 6.UTILIZE BEST MANAGEMENT PRACTICES (BMP's), AS REQUIRED BY THE STATE WATER RESOURCES CONTROL BOARD, FOR ANY ACTIVITY, WHICH DISTURBS THE SOIL. 7.A WORK SCHEDULE OF GRADING AND EROSION & SEDIMENT CONTROL PLAN SHALL BE PROVIDED TO THE CITY ENGINEER BY AUGUST 15. NO HILLSIDE GRADING SHALL BE PERFORMED BETWEEN OCTOBER 1 TO APRIL 15. 8.ALL NEW ELECTRICAL SERVICE (POWER, PHONE AND OR CABLE) SHALL BE UNDERGROUND. 9.TO INITIATE RELEASE OF BONDS, CONTACT THE PUBLIC WORKS INSPECTOR FOR FINAL INSPECTION. 10.ALL DOWNSPOUTS TO BE RELEASED TO THE GROUND SURFACE, DIRECTED AWAY FROM THE BUILDING FOUNDATIONS AND DIRECTED TO THE LANDSCAPE AREAS. 11.PRIOR TO BEGINNING ANY WORK WITHIN THE PUBLIC RIGHT OF WAY, THE CONTRACTOR WILL BE RESPONSIBLE FOR PULLING AN ENCROACHMENT PERMIT FROM THE PUBLIC WORKS DEPARTMENT. 12.APPROVAL OF THESE PLANS BY THE CITY ENGINEER IS ONLY FOR PUBLIC RIGHT OF WAY IMPROVEMENTS AND NOT FOR WATER, SEWER OR DRY UTILITIES. IT IS THE DEVELOPER'S/ OWNER'S RESPONSIBILITY TO COORDINATE REVIEWS AND APPROVAL FROM EACH OF THE UTILITY COMPANIES, AND TO PROVIDE APPROVAL LETTERS AS REQUESTED/ NEEDED. 13.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THE APPROVED PLANS OR THE LATEST REVISED PLANS ARE FURNISHED TO THE SUB-CONTRACTORS, AND TO ENSURE THE LATEST APPROVED PLANS ARE ONSITE AT ALL TIMES DURING CONSTRUCTION. 14.CONSTRUCTION AREA TRAFFIC CONTROL DEVICES SHALL BE INSTALLED, AS NEEDED, PRIOR TO BEGINNING OF WORK. 15.THE CONTRACTOR SHALL LOCATE UNDERGROUND FACILITIES IN THE AREA OF WORK. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT (USA) AT 811 TWO WORKING DAYS IN ADVANCE OF ANY WORK FOR LOCATION OF THE UNDERGROUND FACILITIES. 16.ALL TRENCH BACKFILL, FILL AREAS, AND BASE MATERIAL SHALL ATTAIN A MINIMUM 95% RELATIVE COMPACTION. FOR TYPICAL TRENCH SECTIONS, EXCEPT FOR SANITARY SEWERS, REFER TO THE CITY STANDARD DETAILS. 17.THE DEVELOPER SHALL PAY ALL COSTS FOR MOISTURE DENSITY CURVES (CALIFORNIA TEST NO. 216E) AND ANY OTHER TESTS REQUIRED BY THE CITY ENGINEER FOR ALL WORK ON THE STREET. 18.TREES, ROOTS, AND FOREIGN MATTER IN EXISTING OR PROPOSED RIGHT-OF-WAY SHALL BE REMOVED TO A DEPTH OF TWO FEET BELOW SUB-GRADE AND DISPOSED OF PER CALTRANS STANDARDS. IN THE CASE OF LIVE TREE ROOTS FROM CITY STREET TREES, CONTRACTOR SHALL CONTACT THE CITY FOR FIELD OBSERVATION PRIOR TO REMOVING TREE ROOTS. 19.TRENCH PLATES, IF REQUIRED, IN THE TRAVELED WAY SHALL BE TRAFFIC RATED, PROPERLY SECURED AND SHALL BE RECESSED UPON THE REQUEST OF THE DIRECTOR OF PUBLIC WORKS. 20.ALL TRENCHES LOCATED WITHIN 5 FEET OF THE EDGE OF PAVEMENT (i.e CURB, LIP OF GUTTER, EDGE OF PAVEMENT ETC.) SHALL BE RE-PAVED TO THE EDGE OF PAVEMENT. 21.EXISTING PAVEMENT THAT IS REMOVED OR DAMAGED SHALL BE REPLACED AS REQUIRED BY THE CITY ENGINEER. 22.CONCRETE FOR USE IN ALL CONCRETE STRUCTURES SHALL CONFORM TO CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS SECTION 90. DROP INLETS, SIDEWALKS, CURBS AND GUTTERS SHALL CONTAIN 590 LBS OF CEMENT PER CUBIC YARD AND SHALL ATTAIN A MINIMUM STRENGTH OF 3,000 PSI IN 28 DAYS. 23.A MINIMUM THICKNESS OF FIVE INCHES OF CONCRETE SHALL BE REQUIRED FOR COMMERCIAL DRIVEWAY APPROACHES AND FOUR INCHES FOR RESIDENTIAL. THE DRIVEWAY APPROACH SHALL BE INSTALLED CONCURRENT WITH THE CONSTRUCTION OF THE CURB AND GUTTER. 24.ONE POUND OF DISPERSING BLACK SHALL BE MIXED WITH EACH CUBIC YARD OF CONCRETE AT THE BATCH PLANT. 25.OWNER/ CONTRACTOR TO CALL CUPERTINO SANITATION DISTRICT AT LEAST 48 HOURS TO SCHEDULE DISTRICT INSPECTION. DISTRICT TO PROVIDE BUILDING DEPARTMENT WITH WRITTEN NOTIFICATION UPON COMPLETION OF INSPECTION. 26.INSTALL AN APPROVED BACKFLOW DEVICE (IAPMO OR UPC APPROVED) ONE FOOT ABOVE THE RIM OF THE NEAREST UPSTREAM MANHOLE. THE BACKFLOW DEVICE WILL BE INSPECTED TO VERIFY EXISTENCE AND SERVICEABILITY BY A DISTRICT INSPECTOR AT THE TIME OF VIDEO INSPECTION. DISTRICT TO PROVIDE BUILDING DEPARTMENT WITH WRITTEN NOTIFICATION UPON COMPLETION OF INSPECTION. EROSION CONTROL NOTES: 1.ALL CONSTRUCTION ACTIVITIES SHALL BE PERFORMED IN CONFORMANCE WITH THE STORM WATER POLLUTION PREVENTION PLAN FOR THIS PROJECT AND AS REQUIRED BY THE STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD R2-2003-0021 AND NPDES PERMIT NO. CAS 0029831. 2.THE DEVELOPER IS RESPONSIBLE FOR ENSURING THAT ALL CONTRACTORS AND SUB-CONTRACTORS ARE AWARE OF ALL STORM WATER QUALITY MEASURES AND IMPLEMENT SUCH MEASURES. FAILURE TO COMPLY WITH THE APPROVED CONSTRUCTION BEST MANAGEMENT PRACTICES WILL RESULT IN THE ISSUANCE CORRECTION NOTICES, CITATIONS, AND/ OR STOP ORDERS. 3.ANY VEHICLE OR EQUIPMENT WASHING/ STEAM CLEANING MUST BE DONE AT AN APPROPRIATELY EQUIPPED FACILITY WHICH DRAINS TO THE SANITARY SEWER. OUTDOOR WASHING MUST BE MANAGED IN SUCH A WAY THAT THERE IS NO DISCHARGE OF SOAPS, SOLVENTS, CLEANING AGENTS OR OTHER POLLUTANTS TO THE STORM DRAINS. WASH WATER SHALL DISCHARGE TO THE SANITARY SEWER, SUBJECT TO REVIEW AND APPROVAL OF UNION SANITARY DISTRICT. 4.THE CONTRACTOR SHALL BE RESPONSIBLE FOR LITTER CONTROL AND SWEEPING OF ALL PAVED SURFACES DURING CONSTRUCTION. 5.THE FACILITIES SHOWN ON THIS PLAN ARE DESIGNED TO CONTROL EROSION AND SEDIMENT DURING THE RAINY SEASON, OCTOBER 1 TO APRIL 15. EROSION CONTROL MEASURES ARE TO BE FUNCTIONAL PRIOR TO OCTOBER 1ST OF ANY YEAR GRADING OPERATIONS HAVE LEFT AREAS UNPROTECTED FROM EROSION. 6.ALL ON-SITE STORM DRAINS SHALL BE CLEANED IMMEDIATELY BEFORE THE START OF THE RAINY SEASON BEGINNING ON OCTOBER 1ST EACH YEAR, SUBJECT TO THE REVIEW OF THE BUILDING/ ENGINEERING INSPECTOR. 7.IF RAINY WEATHER BECOMES IMMINENT, GRADING OPERATIONS SHALL BE STOPPED AND EROSION CONTROL MEASURES SHALL BE IMPLEMENTED TO PROTECT DISTURBED AREAS. 8.DURING THE RAINY SEASON, ALL PAVED AREAS SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. THE SITE SHALL BE MAINTAINED SO AS TO MINIMIZE SEDIMENT LADEN RUNOFF TO ANY STORM DRAIN SYSTEM. 9.CONSTRUCTION ENTRANCES SHALL CONSIST OF A MINIMUM 8" THICK LAYER OF 3"-4" FRACTURED STONE AGGREGATE UNLAID WITH GEOTEXTILE LINER FOR A MINIMUM DISTANCE OF 50 FEET, AND IS TO BE PROVIDED AT EACH VEHICLE ACCESS POINT TO EXISTING PAVED STREETS. THE DEPTH AND LENGTH OF AGGREGATE MAY NEED TO BE ADJUSTED IN THE FIELD TO ENSURE NO TRACKING OF SEDIMENT ONTO EXISTING PAVED STREETS. CONSTRUCTION ENTRANCES SHALL SLOPE AWAY FROM EXISTING PAVED STREETS. 10.INLETS NOT USED IN CONJUNCTION WITH EROSION CONTROL MEASURES ARE TO BE BLOCKED UNLESS THE AREA DRAINED IS UNDISTURBED OR STABILIZED. 11.BORROW AREAS AND TEMPORARY STOCKPILES SHALL BE PROTECTED WITH APPROPRIATE EROSION CONTROL MEASURES TO THE SATISFACTION OF THE CITY ENGINEER. 12.NO STRAW BALES OR SILT FENCES SHALL BE USED AS EROSION CONTROL MEASURES. SILT FENCES MAY ONLY BE USED AS A PHYSICAL BARRIER TO PREVENT VEHICULAR AND PEDESTRIAN TRAFFIC FROM USING NON-APPROVED ACCESS POINTS (E.G.-ALONG RIGHT-OF-WAY). 13.ALL DISTURBED AREAS INCLUDING FLAT PADS ARE TO BE TREATED WITH STRAW AND TACKIFIER AT A RATE OF 2 TONS PER ACRE APPROXIMATELY 3 INCHES THICK, APPROVED EQUAL. MALALEUCA LINARIFOLIA5 24" BOX GINKGO2 24" BOX PROPOSED LAWN NANDINA DOMESTICA 'COMPACTA' HEAVENLY BAMBOO 2 5 GAL JUNCUS PATERNS 'CARMAN'S GRAY' GRAY CALIFORNIA RUSH 7 1 GAL 7 1 GAL JUNCUS PATERNS 'CARMAN'S GRAY' GRAY CALIFORNIA RUSH ABELLA EDWARD GOUCHER EDWARD GOUCHER ABELLA 8 5 GAL ABELLA EDWARD GOUCHER EDWARD GOUCHER ABELLA 3 5 GAL AZALEA 'BRILLIANT' BRIGHT PINK SUN AZALEA 6 5 GAL VIBURNUM DAVIDIL DAVIDIL VIBURNUM 7 5 GAL NANDINA DOMESTICA 'COMPACTA' HEAVENLY BAMBOO 1 5 GAL NANDINA 'FIREPOWER' DWARF HEAVENLY BAMBOO 6 1 GAL  ƒ  / , 1 (  2 )  6 , * + 7   ƒ  / , 1 (  2 )  6 , * + 7 2nd Floor Window Location 2nd Floor Window Location ƒ/ , 1 (  2 )  6 , * + 7  ƒ  / , 1 (  OF S I G H T 2nd Story 2n d S t o r y 2n d S t o r y 2n d S t o r y 2nd Story 2nd Story 2nd Story VINCA AREAS 12" O.C. DROUGHT RESISTANT FESCUE TURF SOD GAZANIA AREAS 12" O.C. PROPOSED 5 GALLON CONTAINER SHRUB PROPOSED 5-GALLON CONTAINER SHRUB VINCA MINOR - DWARF PERIWINKLE GROUND COVERS: GAZANIA UNIFLORA (WHITE) - AFRICAN DAISY ABELLA EDWARD GOUCHER GINKO AS REQUIRED 3 11 2 TREES: SHRUBS: 5GC 5GC 24" BOX NANDINA DOMESTICA 'COMPACTA' JUNCUS PATERNS 'CARMAN'S GRAY' AS REQUIRED AZALEA 'BRILLIANT' VIBURNUM DAVIDIL 14 6 7 NANDINA 'FIREPOWER'6 1GC 5GC 5GC 1GC MALALEUCA LINARIFOLIA5 24" BOX GENERAL NOTES: 1.THE PROPERTY OWNER SHALL RECORD A COVENANT ON THE PROPERTY FOR THE NEW TREES/ SHRUBS PLANTED FOR PURPOSE OF PRIVACY PROTECTION AND REQUIRED FRONT YARD TREE. 2.FOLLOWING COMPLETION OF CONSTRUCTION, AN AFFIDAVIT FROM AN ISA-CERTIFIED ARBORIST SHALL BE PROVIDED CONFORMING THAT THE NEW TREES HAVE BEEN PLANTED PROPERLY AND ACCORDING TO PLAN. 3.A PLANNING DIVISION INSPECTION IS REQUIRED TO VERIFY EXTERIOR MATERIALS/ FINISHES, TREES, LANDSCAPING AND SITE WORK.