HomeMy WebLinkAbout06-11-2015CITY OF CUPERTINO
AGENDA
Thursday, June 11, 2015
Conference Room C
ADMINISTRATIVE HEARING
5:00 PM
ROLL CALL
APPROVAL OF MINUTES
1.Subject: Draft Minutes of May 28, 2015
Recommended Action: approve or modify the Draft Minutes of May 28, 2015
Draft Minutes of May 28, 2015
ORAL COMMUNICATIONS
(Reserved for persons wishing to address the Committee or Hearing Officer on
issues that are not already included on the regular Order of Business)
WRITTEN COMMUNICATIONS
PUBLIC HEARING ITEMS
2.Subject: duplex addition
Recommended Action: Approve the application per the draft resolution
Description:
Application No(s): ASA-2015-10
Applicant(s): David Warren (Ng properties)
Location: 22372-22374 McClellan Rd APN#356-04-027
Architectural and Site approval to allow a 438 square foot addition to an existing
single story duplex
The Hearing Officer's decision is final unless appealed
Staff Report
Draft Resolution
Plan Set
3.Subject: new residential construction
Page 1 CITY OF CUPERTINO
June 11, 2015Administrative Hearing AGENDA
Recommended Action: approve the application per the draft resolution
Description:
Applicantion No(s).: ASA-2015-06
Applicant(s): Depak Chandani (Sinha/Thawani residence)
Location: 21891 Granada Ave
Architectural and Site approval to allow the construction of a new 3,017 square foot,
two-story residence in a Planned Development Zone
The Hearing Officer's decision is finalled unless appealed
Staff Report
Draft Resolution
Plan Set
OLD BUSINESS
NEW BUSINESS
ADJOURNMENT
If you challenge the action of the Hearing Officer at the Administrative Hearing in
court, you may be limited to raising only those issues you or someone else raised at the
public meeting described in this notice, or in written correspondence delivered to the
City of Cupertino at, or prior to, the meeting. Please note that the policy for oral
communication is to allow an applicant and groups to speak for 10 minutes and
individuals to speak for 3 minutes. In the event an action taken by the Hearing Officer is
deemed objectionable, the matter may be officially appealed to the Planning
Commission in writing within fourteen (14) days of the date of the Hearing Officer’s
decision. Said appeal is filed with the City Clerk (Ordinance 632).
Members of the public are entitled to address the Hearing Officer concerning any item
that is described in the notice or agenda for this meeting, before or during
consideration of that item. If you wish to address the Hearing Office on any other item
not on the agenda, you may do so during the public comment portion of the meeting.
Please limit your comments to three (3) minutes or less.
In compliance with the Americans with Disabilities Act (ADA), anyone who is planning
to attend the next Administrative Hearing meeting who is visually or hearing impaired
or has any disability that needs special assistance should call the City Clerk's Office at
408-777-3223, 48 hours in advance of the meeting to arrange for assistance. Upon
request, in advance, by a person with a disability, Administrative Hearing meeting
agendas and writings distributed for the meeting that are public records will be made
available in the appropriate alternative format. Also upon request, in advance, an
assistive listening device can be made available for use during the meeting.
Page 2 CITY OF CUPERTINO
Administrative Hearing
May 28, 2015
Cupertino, CA 95014
(408) 777-3308
ACTIONMINUTES OF THE REGULAR MEETING OF
THE ADMINISTRATIVE HEARING HELD ON May 28,2015
ROLL CALL
Hearing Officerpresent:Gary Chao, Assist. Director of Community Development
Staff present: Kaitie Groeneweg, Assistant Planner
Erick Serrano, Assistant Planner
Applicant(s)present:Brian Carrera, Agent(NTerra for Apple, Inc.)
Neil Woolner, Arborist (Arborwell)
Susan Cutler, Project Manager(Apple, Inc.)
APPROVAL OF MINUTES:
May 14, 2015
The minutes of May 14,2015were approved as written
POSTPONEMENTS/REMOVAL FROM CALENDAR:
None
ORAL COMMUNICATION:
None
WRITTEN COMMUNICATIONS:
None
PUBLIC HEARING:
1.Application No.(s): ASA-2015-04, TR-2015-09
Applicant:John Noori(Apple, Inc)
Location:19191 Vallco Parkway
Architectural and Site approval to allow parking lot improvements and the
construction of private, on-site, bus shelters at an office complex;
Tree Removal permit to allow the removal and replacement of 102 protected trees to
allow for parking lot improvements at an office complex
Administrative Hearingdecision final unless appealed.
2 Administrative Hearing
May 28, 2015
Staff Member Groenewegexplained that Apple, Inc. has proposed parking lot improvements
which include the construction of a bus shelter, pedestrian pathways, re-orienting the
parking stalls, ADA upgrades, EV charging stations, trash “trios”, bicycle racks and lockers
and new parking lot lighting. Theexisting tennis court will be demolished and replaced with
an outdoor seating area for employees. 35 new parking spaces will be created for a site total
of 500parking stalls at the completion of the project, which meets exceeds the Parking
Ordinance requirements.The custom built bus shelters are outside of setback areas and are
meetingthe height requirements. Theapplicant proposes to remove 101trees and transplant
1 tree on the site. They will be replacedwith 112trees, ranging in size from 24”to 60” box.
Theywill be a mixture of young and mature trees whichare native and drought tolerant.The
trees need removed as they fall within the proposed construction site or are in poor health.
Some of the removed trees will be re-purposed on site as benches. The project will be
increasing the overall landscaping on site byapproximately 4000 square feet. Staff has
received an inquiry regarding the trees on the perimeter of the propertyon Tantau Avenue.
Those trees are included in the removal and replanting plan.Staff recommends approval of
the project as it conforms to the Parking and Tree Ordinances.
Hearing Officer Chao clarified the size of the replanted trees and asked what species of trees
would be used. The project Arborist Neil Woolner, stated that the replacement trees would
mostly be Oak and native Sycamoretrees. They are drought tolerant and generally long
lasting. The Hearing Officer confirmed with him that most of the existing trees are in poor
health.
A resident, Jennifer Griffin, spoke to her concernsabout the proposed replacement Sycamore
tree. The Sycamore tree that was on the property years ago (and had been removed prior to
this application) had been a heritage tree and she would like the new tree to be one too. She
wanted assurance that the Oak trees along the Calabasas Creek would be remaining and
wanted clarification about the Ash trees along Tantau Avenue.
The Hearing Officer asked Staff member Groeneweg if she could replyin response to the
concerns raised about the Sycamore and Oak trees. Shestated that the Oak trees are located
on land belonging to the Santa Clara Valley Water District and as such they are not part of
the proposed project. The trees located along Tantau are Oak and Redwood trees and are not
included in the removal plan as part of this project either. A majority of the Ash trees located
along Vallco Parkway will also be retained. The Hearing Officer asked the project Arborist to
talk about the strengths of the proposed replanting plan. He stated that the trees are going to
belargeand are a nice mixture of species that are nativeand hearty.
The Hearing Officer explained to the resident that the proposed bus shelters are within the
project site and are private shelters for the employees. There are no frontage improvements
being made to accommodate the public transit system.
The Hearing Officer stated that he liked the plan. The site modifications are towards the
interior, rear of the building and will make the site much better. The trees will provide
appropriate shading. The parking lot and site improvements will greatly enhance the space.
DECISION: The applicationswereapprovedby the Hearing Officerper the draft resolutions
3 Administrative Hearing
May 28, 2015
2.Application No.(s): ASA-2015-09
Applicant:Susan Cutler(Apple, Inc)
Location:1 Infinite Loop
Architectural and Site approval to allow façade improvements of approximately 102
linear feet on an office building
Administrative Hearing decision final unless appealed.
Staff Member Serranoexplained Apple, Inc. has proposed façade improvements to the
frontage of building 1 (the public Apple Store) at the Infinite Loop campus. The application
also includes a replacement of the existing ground sign. As project meets all of the current
Municipal Codes, Staff recommends approval of the project per the draft resolution.
The Hearing Officer did not have any questions for staff. The proposed project is pretty
straightforward. The applicant also did not have anything to add.
A resident, Jennifer Griffin, asked if this application also included any treeremovals.
The Hearing Officer told her that it did not. He also let her know that all public hearing items
–staff reports, conditions of approvals and decisions are available to the public on the City’s
website.
DECISION: The applicationwasapproved by the Hearing Officerper the draft resolution
ADJOURNMENT
Respectfully submitted:
/s/Beth Ebben
Beth Ebben
Administrative Clerk
g:planning/AHCommittee/Minutes052815
ADMINISTRATIVE HEARINGSTAFF REPORT
Agenda Item No. Agenda Date:June 11, 2015
Application: ASA-2015-10
Applicant:Dave Warren (Ng Properties)
Project Location:22372-22374 McClellan Rd. (APN 356-04-027)
Application Summary:
Architectural and Site Approval (ASA-2015-10) to allow a 438 square foot addition to an
existing single story duplex.
RECOMMENDATION:
Staff recommends that the Hearing Officer:Approve the Architectural and Site Approval (ASA-
2015-10) per the draftresolution.
PROJECT DATA:
General Plan
Designation
Residential Low/Medium Density (5-10 DU/Gross Acre)
Zoning Designation R2-4.25i (Residential Duplex District,
8,500 square feet minimum lot sizesingle story overlay)
Existing/Proposed Use:Residential duplex
Lot Size 8,850 square feet (0.2 acres)
Allowed/Required Existing Proposed
Lot coverage 40% (3,540 s.f.)35% (3,066 s.f.)39% (3,504 s.f.)
Height One story, not
exceeding 18’
16’16’(no change)
First floor building
setbacks
Front-20’
Side (combined)-15’;
6’ min.
Rear-23’6”
Front –20’
Side(combined)-
18’7”;
9’4” each side
Rear –36’
Front-20’ (no change)
Side (combined) –18’7”;
9’4” each side (no
change)
Rear-20’1
Project Consistency with:
1May be reduced to 10 feet provided that the required rear-yard setback area is no less than eight hundred fifty
square feet or twenty times of the lot width.The proposal meets the required rear yard of 1,500 square feet.
OFFICE OF COMMUNITY DEVELOPMENT
CITY HALL
10300 TORRE AVENUE •CUPERTINO, CA 95014-3255
(408) 777-3308 • FAX (408) 777-3333 • planning@cupertino.org
ASA-2015-10 Addition to Existing Duplex June 11, 2015
Page 2
General Plan Yes
Zoning Yes
Environmental Review Categorically Exempt per Section 15301, Class 1 (Existing Facilities –
Additions to Existing Structures) of California Quality Act (CEQA)
BACKGROUND:
The subject property is located on the south side of McClellan Roadand currently consists of a
duplex residence. To the northand south are single family residences, whileother duplexes are
located to the west and east.
DISCUSSION:
The applicant, Dave Warren,
representing the property owner Ng
Properties, is proposing a 219 square
foot addition to each unit in the
existing duplex (combined 438
square feet) to add a bedroom and
bathroom. An interior remodel is
replacing one of the existing
bedroom and bathrooms in each unit
with a den, thus the bedroom count
is not increasing.
Theaddition is harmonious with
existing architecture, colors, and
materialsof the duplex. According to the R-2 ordinance, all additionsin the R-2 zoning district
require Architectural and Site Approval at an Administrative Hearing,in order to assure a high
degree of architectural quality and to address other development issues. The project is
consistent with the General Plan and the R-2 Ordinance (lot coverage, setbacks, building
height). The design of the addition is compatible with the existing structure and the exterior
materials for the addition match existing materials.
OUTREACH/NOTICING
The following table is a brief summary of the noticing done for this project:
Notice of Public Meeting & Site Signage Agenda
Posted on the site (10 days prior to hearing)
___notices mailed to property owners
adjacent to the project site (10 days prior to
hearing)
Posted on the City's official notice bulletin
board (one weekprior to hearing)
Posted on the City of Cupertino’s Web site
(one weekto hearing)
ASA-2015-10 Addition to Existing Duplex June 11, 2015
Page 3
PERMIT STREAMLINING ACT
This matter is adjudicatory and is subject to the Permit Streamlining Act (Government Code
Section 65920 –65964). The City has complied with the deadlines found in the Permit
Streamlining Act.
Project Received: May 13, 2015
Deemed Complete: May 28, 2015
Since this project is Categorically Exempt, the City has60 days (until March23, 2015)to make a
decision on the project.The Hearing Officer’s decision on this project is final unless appealed
within 14 calendar days of the decision.
CONCLUSION
Staff recommends approval of the Architectural and Site Approval, since the plans and
conditions of approval address all concerns related to the proposed project. Additionally, all of
the findingsfor approval of the proposed project, consistent with Chapter 19.168 of the
Cupertino Municipal Code, may be madeas reflected in the Draft Resolution.
Submittedby:Gian Paolo Martire, AssistantPlanner
Reviewed by: Rebecca Tolentino, Senior Planner
Attachments
DraftResolution
Plan Set
ASA-2015-10
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
DRAFT RESOLUTION
OF THE ADMINISTRATIVE HEARING MEETINGOF THE CITY OF CUPERTINO FOR
AN ARCHITECTURAL ANDSITE APPROVAL OF A438 SQUARE FOOT ADDITION
TO AN EXISTING SINGLE STORYDUPLEX LOCATED AT 22372-22374 MCCLELLAN ROAD
SECTION I: PROJECT DESCRIPTION
Applicant:Dave Warren
Property Owner: Ng Properties
Location:22372-22374 McClellan Rd. (APN 356-04-027)
SECTION II: FINDINGS
WHEREAS, the Administrative Hearing Officerof the City of Cupertino received an application
to allow an Architectural and Site Approval ofa 438 square foot addition to an existing single
story duplex located in an R2-4.25izoning district;
WHEREAS, the necessary public notices have been given asrequired by the Procedural
Ordinance of the City of Cupertino, and the Hearing Officerhas held at least one public hearing
in regard to the application; and
WHEREAS, the applicant has met the burden of proof required to support said application; and
WHEREAS, the Administrative Hearing Officerfinds:
1.The proposal, at the proposed location, will not be detrimental or injurious to property or
improvements in the vicinity, and will not be detrimental to the public health, safety,
general welfare, or convenience;
The applicant is proposing to add 219square feet to eachof the units of an existing duplex in order to
add a bedroom and bathroom. The applicant is also proposing to remodel the interior. Since the
proposed addition and remodel is located on private property does not conflict with any public
easements, and is consistent with applicable code requirements. The project is not detrimental to the
public health, safety, general welfare or convenience.
2.The proposal is consistent with the purposes of Chapter 19.168, Architectural and Site
Review, of the Cupertino Municipal Code, the General Plan, any specific plan, zoning
ordinances, applicable planned development permit, conditional use permits, variances,
Draft Resolution ASA-2015-10 June 11, 2015
Page 2
subdivision maps or other entitlements to use which regulate the subject property
including, but not limited to, adherence to the following specific criteria:
a)Abrupt changes in building scale should be avoided.A gradual transition related to
height and bulk should be achieved between new and existing buildings;
The existing building is 16’and there is no proposed increase in height. Therefore,the proposed
addition matches the scale of the existing structure.
b)In order to preserve design harmony between new and existing buildings and in order to
preserve and enhance property values, the materials, textures and colors of new
buildings should harmonize with adjacent development by being consistent or
compatible with design and color schemes, and,with the future character of the
neighborhood and purposes of the zone in which they are situated.The location, height
and materials of walls, fencing, hedges and screen planting should harmonize with
adjacent development.Unsightly storage areas, utility installations and unsightly
elements of parking lots should be concealed.The planting of ground cover or various
types of pavements should be used to prevent dust and erosion, and the unnecessary
destruction of existing healthy trees should be avoided.Lighting for development should
be adequate to meetsafety requirements as specified by the engineering and building
departments, and provide shielding to prevent spill-over light to adjoining property
owners; and
The addition is proposed to have the same building materials and be painted thesameas the
existing structure. The project proposes nochanges to the location, height, and materials of walls
fencing, hedges and screen planting, and is tobe consistent with the requirements of Cupertino
Municipal Code Chapter 19.48: Fences. Exterior lighting other than that expected in residential
development is not being proposed. Therefore, there are no spill-over light impacts expected from
the development.
c)With respect to new projects within existing residential neighborhoods, new
development should be designed to protect residents from noise, traffic, light and
visually intrusive effects by use of buffering, setbacks, landscaping, walls and other
appropriate design measures
The proposed addition meets the required setbacks of the R-2 Zoning District. Since the addition is
a single story addition, the applicant is not required to plant additional screening landscape
material.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted
in this matter,subject to the conditions which are enumerated inSection III and IV ofthis
Resolution beginning on Page 3thereof,the Application No. ASA-2015-10is hereby approved;
andthat the sub-conclusionsupon which the findings and conditions specified in this Resolution
Draft Resolution ASA-2015-10 June 11, 2015
Page 3
are based and contained in the public hearing record concerning Application ASA-2015-10as set
forth in the Minutes of the Administrative HearingMeeting of June11, 2015, and are
incorporated by referenceas though fully set forthherein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT
DEPARTMENT
1.APPROVED EXHIBITS
Approval is based on the plan set entitled, “Existing Duplex Residential Addition and
Remodel for: Mr. & Mrs. Chun H. Ng, 22372-22374 McClellan Road, Cupertino, California
95014” dated April 27, 2015 drawn by David Warrenof T-Sq.Design, consisting of three (3)
sheets labeled A-1 through A-3, except as may be amended by conditions in this resolution.
2.ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data including
but not limited to property boundary locations, building setbacks, property size, building
square footage, any relevant easements and/or construction records. Any misrepresentation
of any property data may invalidate this approval and may require additional review.
3.FENCES
All fencing shall comply with Cupertino Municipal Code Chapter 19.48: Fences. Any
changes to the fencing shall require design review with the Community Development
Department.
4.CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with regard
to the proposed project for additional conditions and requirements. Any misrepresentation
of any submitted data may invalidate an approval by the Community Development
Department.
5.EXTERIOR BUILDING MATERIALS/TREATMENTS
Final building exterior treatment plan (including but not limited to details on exterior color,
material, architectural treatments and/or embellishments) shall be reviewed and approved
by the Director of Community Development prior to issuance of building permits. The final
building exterior plan shall closely resemble the details shown on the original approved
plans. Any exterior changes determined to besubstantial by the Director of Community
Development shall require a modification approval with neighborhood input.
6.INDEMNIFICATION
To the extent permitted by law, the Applicant shall indemnify and hold harmless the City,
its City Council, its officers, employees and agents (the “indemnified parties”) from and
against any claim, action, or proceeding brought by a third party against the indemnified
parties and the applicant to attack, set aside, or void this ordinance or any permit or
approval authorized hereby for the project, including (without limitation) reimbursing the
Draft Resolution ASA-2015-10 June 11, 2015
Page 4
City its actual attorneys’ fees and costs incurred in defense of the litigation.The City may,
in its sole discretion, elect to defend any such action with attorneys of its choice.
7.NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees, dedication
requirements, reservation requirements, and other exactions. Pursuant to Government
Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the
amount of such fees, and a description of the dedications, reservations, and other exactions.
You are hereby further notified that the 90-day approval period in which you may protest
these fees, dedications, reservations, and other exactions, pursuant to Government Code
Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying
with all of the requirements of Section 66020, you will be legally barred from later
challenging such exactions.
PASSED AND ADOPTED this 11th day of June, 2015 at a noticed Public Meeting of the
Administrative Hearing Officer of the City of Cupertino, State of California, held by the
Director of Community Development, or his or her designee, pursuant to Cupertino Municipal
Code Section 19.12.120.
ATTEST:APPROVED:
Gian Paolo Martire Gary Chao
Assistant Planner Asst. Director of Community Development
22374 22372
1 1
1
(E)75'-0" Req'd Rear Yard Area1
1
Not Shown in Lot Coverage
Existing and New Overhang, Patio & Porch Square Footage
(Total for 22372 & 22374)
Existing Overhang Area: 283
New Overhang Area Areas: 136
Existing Patio Area :300
Removed during construciton and
New to match Existing Footprint
Existing Porch: 80
Total Overhang, Patio & Porch Areas: 799
1
1
1
1
(E
)
2
0
'
-
0
"
(E
)
6
2
'
-
0
"
(N
)
1
6
'
-
0
"
(N
)
2
0
'
-
0
"
Re
q
'
d
R
e
a
r
Y
a
r
d
A
r
e
a
(E)&(N)9'-4 "
(E) & (N)13'-8"14'-6"14'-6"(E) & (N)13'-8"
(E)&(N)9'-4"(E)&(N)28'-2"(E)&(N)28'-2"
1'-0"1'-0"
(E)8'-4"(E)20'-2"(E)18'-0"(E)20'-2"(E)8'-4"
SITE & EXISTING FLOOR PLAN
scale: 1/8" = 1'-0"
(E) sidewalk
(E) conc. curb & gutter
McCLELLAN ROAD
(E) conc.
driveway
(E) landscaping
(E) landscaping
DRAWING INDEX
PROJECT CONSULTANTS:
(E) walkway
property
line
(E) utility pole,
exist'g point
of service
to remain
(E) landscaping
(E) wood
fencing
(E) 18" tree,
to remain, verify location
property
line
75.00'
11
8
.
0
0
'
11
8
.
0
0
'
75.00'
(E) 18" tree,
to remain. verify location
(E)&(N) conc.
patio &
walkway.
(E) 2- gas
meters
(E) City street light (E) 2- water
meters
(E) conc.
driveway
(E) sewer line
clean-out
(E) landscaping
(E) landscaping
(E) walkway
(E) landscaping
(E) wood
fencing
(E) wood
fencing
(E) wood
gates
(E) wood
gates
480 sq. ft.
(E) Garage Area
1,053 sq. ft.
(E) Living Area
1,053 sq. ft.
(E) Living Area
480 sq. ft.
(E) Garage Area
219 sq. ft.
(N) Living Area
219 sq. ft.
(N) Living Area
(N) conc.
walkway
(N) ADD ALTERNATE 1
bay window element, see
New Floor Plan sht. A-2
See Floor Plan for
Inter. Dim's:13.4 sq. ft
reserved and include
in floor area ratio for
a future garage upgrade
See Floor Plan for
Inter. Dim's:13.4 sq. ft
reserved and include
in floor area ratio for
a future garage upgrade
(N) conc.
walkway
(E)&(N) conc.
patio &
walkway.
NOTE:
(E) conc. patio &
walkway to be
removed during
construction.
(N) patio to match
(E) footprint
A
r
c
h
i
t
e
c
t
u
r
a
l
D
e
s
i
g
n
&
D
r
a
f
t
i
n
g
S
e
r
v
i
c
e
T
-
S
q
.
D
e
s
i
g
n
6
1
4
9
G
e
r
o
n
i
m
o
D
r
.
,
S
a
n
J
o
s
e
,
C
a
l
i
f
.
9
5
1
2
3
p
h
o
n
e
&
f
a
x
:
1
(
4
0
8
)
2
2
5
-
2
5
3
3
D
a
v
i
d
D
.
W
a
r
r
e
n
,
P
r
i
n
c
i
p
a
l
Date:
Drawn By:
Job Number:
A-1
Sheet Number:
1 of 3
R
e
v
i
s
i
o
n
s
:
1501
April 27, 2015
G
E
N
E
R
A
L
N
O
T
E
S
;
B
U
I
L
D
I
N
G
S
U
M
M
A
R
Y
&
S
C
O
P
E
O
F
W
O
R
K
;
I
N
D
E
X
T
O
D
R
A
W
I
N
G
S
E
X
I
S
T
I
N
G
a
n
d
N
E
W
S
I
T
E
P
L
A
N
s
c
a
l
e
a
s
n
o
t
e
d
o
n
d
r
a
w
i
n
g
BUILDING SUMMARY/ SCOPE OF WORK:
APN: 356-04-027
Jurisdiction: City of Cupertino
Zoning: R-2-4.25i Residential Duplex
Cupertino , County of Santa Clara, State of California,
Use: Two Family No. of Stories: One Story
Occupancy Group: R3 Construction Type: VN
Fire Sprinkler System: No
Existing Square Footage
(Total for 22372 & 22374)
Existing Living Area: 2,106
Existing Garage Area: 960
Total Existing Building Area: 3,066
Proposed New Addition Square Footage
(Total for 22372 & 22374)
New Living Addition Area: 438
New Garage Addition Area (N/A): 0
Total New Addition Area: 438
Proposed Existing and New Addition Square Footage
(Total for 22372 & 22374)
Existing & New Living Addition Areas: 2,544
Existing Garage Areas: 960
Total Existing & New Addition Areas: 3,504
M
r
.
&
M
r
s
.
C
h
u
n
H
.
N
g
2
2
3
7
2
-
2
2
3
7
4
M
c
C
l
e
l
l
a
n
R
o
a
d
,
C
u
p
e
r
t
i
n
o
,
C
a
l
i
f
o
r
n
i
a
9
5
0
1
4
C
o
u
n
t
y
o
f
S
a
n
t
a
C
l
a
r
a
,
A
P
N
:
3
5
6
-
0
4
-
0
2
7
Proposed Net Ratio Calculations
A. Lot Size: 8,850 sq. ft.
B. Gross duplex/house size (including garage): 3,504 sq. ft.
C. Garage reserved Floor Ratio Upgrade:26 sq. ft.
D. Total Gross Floor Area (B+C): 3,530 sq. ft.
E. Calculate Floor Area Ratio (divide D by A): 0.398 F.A.R.
Scope of Work:
Construction to include the following to each duplex unit:
New Master Bedroom & Master Bathroom ; Remodel Existing
Bedroom and Bathroom. As well as all applicable building
exterior and interior finishes, windows, doors, cabinetry, plumbing
fixtures and utility service necessary to complete the project.
GENERAL NOTES
1 Existing Conditions: All information relating to existing conditions is given as being the best information
available but without guarantee of accuracy. The general contractor and sub-contractors shall verify all existing
conditions and construction. Field measurement responsibility shall be with the general contractor and also with
each sub-contractor and measurements shall be made prior to fabrication or construction and all major discrepancies
between drawings and field conditions shall be reported to the owner. All existing structures, landscaping, utility
services, finishes or materials to remain are to be protected during construction and are the responsibility of the
general contractor and sub-contractors to remain in the condition as when construction started or shall be repaired
or replaced at no cost to the owner. Patching and rehabilitation is part of this work and where removal of or
existing
conditions leaves holes or defacement of exposed existing they shall be repaired by appropriate trades.
2.Codes: All work shall be in accordance with applicable editions of governing local, state and national
building, fire, mechanical, plumbing, electrical and health codes. ( 2013 California Build'g Code based on IBC 2012
edition; 2013 California Residential Code based on IRC 2012 edition; 2013 California Plumbing Code based on 2012
UPC; 2013 Mechanical Code based on 2012 UMC; 2013 Electrical Code based on 2012 NEC; 2013 California
Existing Building Code; 2012 International Existing Building Code; 2008 California Building Energy Efficiency
Standards; 2013 California Green Building Standards Code and 2013 California Fire Code based of 2012 IFC)
3 Energy Statement: The modifications to the existing structure are to meet the requirements of the state
emergy efficiency standards.
4 Electrical: The General Contractor and Electrical Sub-contractor shall verify existing electrical service and
provide proper upgrade for new fixture and appliance requirements. All changes and modifications to the existing
service system as well as the new electrical and lighting work to be done in accordance with applicable codes..
All receptacles near water source installed at counter top lines must be of a ground fault interrupter (GFCI) type.
Provide separate dedicated circuit as required per equipment, appliance and code requirements. All interior
recepticals and switches installed along a exterior wall line shall comply with energy compliance requirements.
5 Mechanical: The Mechanical Sub-contractor shall verify existing Forced Air Heater/ Air Conditioning
Mechanical services and equipment. All new work, if applicable, shall be in accordance with applicable codes and
requirements and the recommended practices of SMACNA. All new heating, ventilating, air conditioning and water
heating equipment shall meet all California State requirements and be certified. New Thermostats, if applicable shall
be equipped with an auto setback. New fan systems, if applicable, exhausting air to the outside shall be provided
with back-draft dampers. Existing Furnace locations to remain. All new exhaust termination's from dryers and fans
must be at least three feet away from openable windows, skylights and attic vents. Flexible air ducts must be
installed according to manufactures instructions and must use UL approved tape per UMC
6 Plumbing: It is the intent of this project to utilize and connect new fixtures to the existing supply and
drainage lines. The plumbing sub-contractor shall verify existing conditions and provide all new work with proper
supply and drainage sizes, types of piping, venting, and plumbing fixture types and models, so as to provide a proper
plumbing supply and drainage system. All work shall be in accordance with applicable codes and requirements and
the recommended practices of SMACNA. All work shall also be in accordance with the California State
requirements for fixtures individual control values of thermostatic mixing or pressure balance and maximum flush and
flow capacities..
7 All Electrical HVAC and Plumbing work shall be done in accordance with the Local Building Code and
Standards- by Licensed Contractors. Obtain all Electrical, HVAC and Plumbing Permits before beginning installation.
8 Roof Penetrations: All roof penetrations shall be flashed and caulked watertight and finished to
match roofing color.
9 Existing landscaping, plants, shrubs and trees are to be protected during construction.
10 The Building and Grounds shall be kept neat and clean at all times. After completion of the Project
and before receiving final payment, the Contractor shall have the Building and Grounds cleaned to the Owners
satisfaction.
11 The Drawings shall serve as a guide for the scope of the project; however, they are not complete in every
detail. The General Contractor and all Sub-contractors shall provide all necessary labor, materials and equipment
required to fully complete the project.
12 Drawing reproduction may be subject to distortion. Contact owner, prior to commencement of work,
regarding
any dimensions which appear to be missing or in error.
13 The General Contractor alone is responsible for safety. Site review of the construction by the architect,
design or engineer is to determine conformance with the plans only. It does not encompass safety procedures nor
operations.
14 No guarantee of quality of construction is intended or implied by the architectural documents herein, and the
Contractor(s) shall assume full responsibility for any and all construction deficiencies.
15 These documents shall not be considered complete and ready for estimating and construction until a
Building Permit has been issued. Issuance of a Building Permit does not relieve the Contractor(s) from responsibility
for conforming to all aspects and requirements of the Building Codes.
16 All work connected with this Project shall be done in a professional manner in accordance with the
traditionally and legally defined best-accepted practice of each of the Trades involved. These contract documents
are intended for use in a negotiated contract and may not specify and define materials and manufacturers. The
Contractor shall provide all samples, cuts or examples as needed to assist the Owner or His Agent in making
selections, for the purpose of estimating. The Contractor shall use the materials and finished selected by the
Owners or in the absence of same, and they shall provide an allowance amount and so structure the cost estimate.
All the materials shown in these contract documents shall be itemized and included in said cost estimates.
17 The Contractor shall be responsible for obtaining all necessary permits, licenses and bonds so that
construction can commence. Contractor must follow up with the appropriate departments to ensure final permits
and certificates of occupancy are awarded to the store.
18 The Contractor shall verify all dimensions prior to construction, reporting to the Designer, Engineer and
Owner any errors, omissions or discrepancies.
19 (E) = Existing (N) = New
FINISH NOTES :
1.Existing walls and ceilings finish, in remodeled area, to be removed, as noted, and replaced with New,
thickness of material based on stud spacing and ceiling member requirements.
2.Provide New thermal insulation at exposed exterior walls, ceiling lines and areas per code requirememnts.
3.Existing windows, as noted, to remain. Provide new windows, as noted, at existing locations.
CONVENTIONAL CONSTRUCTION NOTES (where applicable)
CC1 This project is designed in accordance with The Conventional Light-Frame Construction Provisions of the
2007 edition of California Building Code and it's latest revisions and specific City adopted amendments. There
are no shearwalls. Lateral loads are resisted by “Braced Wall Panels” and/or “Alternate Braced Wall Panels.
CC2 All structural wood shall be Douglas Fir Larch or equivalent. The moisture content at time of construction
shall not exceed 19% and all shall be grade stamped “S-Dry”.
CC3 All ledgers and girders or beams carrying other beams shall be Douglas Fir Larch number 1,
unless noted otherwise.
CC4 All floor joists and roof rafters shall be Douglas Fir Larch number 2, unless noted otherwise.
CC5 All ceiling joists shall be Douglas Fir Larch number 2, unless noted otherwise.
CC6 All framing, bracing, nailing, notching, drilling, or boring shall be in accordance with CBC, Conventional
Light-Frame Construction Provisions
CC7 All fastenings shall be in accordance with CBC applicable Sections. End and edge distances and nail
penetrations shall be in accordance CBC applicable Sections.
CC8 All foundation plates and sills and sleepers on concrete or masonry slab, which is in contact with earth
and sills which rest on concrete or masonry foundations, shall be treated wood or foundation grade redwood marked
or branded by an approved agency and shall comply with CBC.
CC9 All exposed structural wood shall be wood of natural resistance to decay or treated wood and shall comply
with CBC applicable Sections.
CC10 All framing connections shall be by positive and direct bearing or by metal (mechanical) connectors as
manufactured by Simpson Strong Ties Company or equivalent. The contractor shall be responsible for selecting the
appropriate size and configuration of connectors per the series or types called out on notes, plans or details. The
highest load carrying capacity connectors shall be selected in case of any conflict between details and notes.
E
x
i
s
t
i
n
g
D
u
p
l
e
x
R
e
s
i
d
e
n
t
i
a
l
A
d
d
i
t
i
o
n
a
n
d
R
e
m
o
d
e
l
f
o
r
:
S
t
e
v
e
n
C
.
C
h
u
1
0
6
1
5
J
o
h
n
W
a
y
,
C
u
p
e
r
t
i
n
o
,
C
a
.
9
5
0
1
4
p
h
o
n
e
:
1
(
4
0
8
)
5
0
5
-
9
9
8
5
P
r
o
f
e
s
s
i
o
n
a
l
E
n
g
i
n
e
e
r
#
5
2
1
6
0
e
x
p
.
D
e
c
.
2
0
1
4
GENERAL NOTES; BUILDING SUMMARY &
SCOPE OF WORK; INDEX TO DRAWINGS,
CONSULTANT LIST and
EXISTING and NEW SITE PLAN
EXTERIOR ELEVATIONS
EXISTING FLOOR PLAN,
NEW FLOOR PLAN ADDITION,
and EXISTING & NEW ROOF PLAN
A-1
A-2
A-3
FRI Energy Consultants, LLC
21 N. Harrison Ave.
Campbell, Calif. 95008
phone: 1(408) 866-1620
fax: 1(408) 866-6832
Steven C. Chu
10615 John Way
Cupertino, Ca. 95014
phone: 1(408) 505-9985
Professional Engineer
#52160 exp. Dec. 2014
Minor Architectural and Site Approval (ASA)
for approval at an Administratice Hearing
Mr. & Mrs. Chun H. Ng
22372 - 22374 McClellan Road, Cupertino, California 95014
County of Santa Clara, APN: 356-04-027
Existing Duplex Residential Addition and Remodel for:
M
i
n
o
r
A
r
c
h
i
t
e
c
t
u
r
a
l
a
n
d
S
i
t
e
A
p
p
r
o
v
a
l
(
A
S
A
)
(E) overhead elect.
service line,
to remain
(E) overhead elect.
service line and 2- main
panel/meter to remain
(E) ingress and egress
driveway cut, to remain
(E) ingress and egress
driveway cut, to remain
5
/
1
1
/
1
5
P
l
a
n
n
i
n
g
D
i
v
i
s
i
o
n
p
r
e
l
i
m
.
r
e
v
i
e
w
p
i
c
k
u
p
s
a
n
d
r
e
v
i
s
i
o
n
s
CMC Sec. 19.32.060(E) Required Rear Yard Area
Not less than 850 sq. ft. or 20 time lot width (20 x 75= 1,500 sq. ft.)
Provided 20' x 75' = 1,500 sq. ft. (complies with requirement)
(E) tub/shower(E) tub/shower
13'-0" x 10'-9"
13'-0"+- x 13'-3"
13'-0" x 11'-3"
13'-0" x 10'-9"
9'-8"+ x 11'-4"
13"-0" x 11'-3"
(E)20'-2"(E)20'-2"(E)18'-0"
(E)58'-4"
(E
)
2
5
'
-
4
"
(E
)
3
6
'
-
8
"
(E
)
2
'
-
5
1
/
2
"
(E
)
1
1
'
-
1
"
(N
)
1
6
'
-
0
"
(E
)
6
2
'
-
0
"
(E)&(N)14'-6"(E)&(N)14'-6"(E)&(N)13'-8"
(E)56'-4"
(E)&(N)13'-8"
12
'
-
8
"
36
'
-
8
"
2'
-
5
1
/
2
"
11
'
-
1
"
8'
-
4
"
2'
-
5
1
/
2
"
12
'
-
4
"
62
'
-
0
"
20'-2"20'-2"18'-0"
58'-4"
13'-8"14'-6"14'-6"13'-8"
56'-4"
(E
)
2
5
'
-
4
"
(E
)
3
6
'
-
8
"
(E
)
2
'
-
5
1
/
2
"
(E
)
1
1
'
-
1
"
(N
)
1
6
'
-
0
"
(E
)
6
2
'
-
0
"
(N
)
5
'
-
1
0
"
(N
)
2
'
-
8
"
(N
)
5
'
-
7
"
(N
)
2
'
-
5
"
(N
)
1
1
'
-
7
1
/
2
"
(N
)
1
1
'
-
0
"
(E) LIVING RM.
(E)
KITCHEN
(E)
GARAGE
(E) +36" ctr.
w/ base
cab. below
(N) pole & sh's
(E) oven/range w/
microwave &
exh. hood above
(E) 3 x 6
entry door
80
(N) cem. plas. over
met. lath on plywd.
sheath'g
(N) Main elect.
panel & Meter
200 amp service
ea. unit
M
r
.
&
M
r
s
.
C
h
u
n
H
.
N
g
2
2
3
7
2
-
2
2
3
7
4
M
c
C
l
e
l
l
a
n
R
o
a
d
,
C
u
p
e
r
t
i
n
o
,
C
a
l
i
f
o
r
n
i
a
9
5
0
1
4
C
o
u
n
t
y
o
f
S
a
n
t
a
C
l
a
r
a
,
A
P
N
:
3
5
6
-
0
4
-
0
2
7
E
x
i
s
t
i
n
g
D
u
p
l
e
x
R
e
s
i
d
e
n
t
i
a
l
A
d
d
i
t
i
o
n
a
n
d
R
e
m
o
d
e
l
f
o
r
:
(E) 16 w. x 7 hgt.
sectional garage door
w/ auto dr. opener
00(E) 16 w. x 7 hgt.
sectional garage door
w/ auto dr. opener
00
(E)
DINING
(E)
DINING
(E)
ENTRY
(E)
HALL
(E)
CLO.
(E) LIVING RM.
(E)
KITCHEN
(N) M. BEDROOM
(E)
GARAGE
(E) BEDROOM 1
(E) WARDROBE
(E)
ENTRY
(E)
HALL
(N)
HALL
(E)
CLO.
(E)
LIVING RM.
(E)
KITCHEN
(E)
BEDROOM 2
(E)
GARAGE
(E)
BEDROOM 1
(E)
BATH
(E)
WARDROBE
(E)
WARDROBE
(E)
LIN.
(E) lav.
(E) WC
(E) 16 w. x 7 hgt.
sectional garage door
w/ auto dr. opener
00(E) 16 w. x 7 hgt.
sectional garage door
w/ auto dr. opener
00
(E) WC
(E) lav.
(E)
DINING
(E)
DINING
(E)
ENTRY
(E)
HALL
(E)
HALL
(E)
LIN.
(E)
CLO.
(E)
CLO.
(E)
LIVING RM.
(E)
KITCHEN
(E)
BEDROOM 2
(E)
GARAGE
(E)
BEDROOM 1
(E)
BATH
(E)
WARDROBE
(E)
WARDROBE
(E)
LIN.
(E)
ENTRY
(E)
HALL
(E)
HALL
(E)
LIN.
(E)
CLO.
(E)
CLO.
(N) WARDROBE
(N) M. BATH
(N)
WC (N) lav.
(E) 3 x 6
entry door
80
8
6
(
N
)
2
x
6
s
c
w
d
.
d
r
.
(E) pole & sh's
(N
)
6
x
6
t
e
m
p
.
d
b
l
.
g
l
a
z
e
d
s
l
.
g
l
.
d
o
o
r
8
0
(E) 8 x 6 temp. dbl.
glazed sl. gl. door
80
(E) WARDROBE
(E) pole & sh's
(E) BEDROOM 1
(N) lav.(N)
WC
(N) pole & sh's
(N) WARDROBE
(N) M. BEDROOM
(N) DEN
(N) DEN
(N) pole & sh's
(N) WARDROBE
(N) lav.(N)
WC
(N) 5-fix.
shelves
(N) LINEN
(E) walls, cabinets & fixtures
to be removed (dotted)
(N) 2x6 stud wall line(E) pass-thru and counter line
(E) oven/range w/
microwave &
exh. hood above
(E) +36" ctr.
w/ base
cab. below
(N) lav.(N)
WC
(E) walls, cabinets & fixtures
to be removed (dotted)
(N) 2x6 stud wall line
(E) 8 x 6 temp. dbl.
glazed sl. gl. door
80
(N
)
6
x
6
t
e
m
p
.
d
b
l
.
g
l
a
z
e
d
s
l
.
g
l
.
d
o
o
r
8
0
(N) 5-fix.
shelves
(N) cem. plas. over
met. lath on plywd.
sheath'g
(N) therm.
exter. wall
insulation
(N) therm.
exter. wall
insulation(N) sht. met. gutter &
downspouts to match
(E) design & profile, verify
(E) 2 x 6
self closing
rated door
88(E) 2 x 6
self closing
rated door
88
(E) pocket dr. to
be removed & infill
(N) framing and
wall finish to
match (E)
(N) ADD ALTERNATE 1
bay window element, see
New Floor Plan sht. A-2
A
r
c
h
i
t
e
c
t
u
r
a
l
D
e
s
i
g
n
&
D
r
a
f
t
i
n
g
S
e
r
v
i
c
e
T
-
S
q
.
D
e
s
i
g
n
6
1
4
9
G
e
r
o
n
i
m
o
D
r
.
,
S
a
n
J
o
s
e
,
C
a
l
i
f
.
9
5
1
2
3
p
h
o
n
e
&
f
a
x
:
1
(
4
0
8
)
2
2
5
-
2
5
3
3
D
a
v
i
d
D
.
W
a
r
r
e
n
,
P
r
i
n
c
i
p
a
l
Date:
Drawn By:
Job Number:
A-2
Sheet Number:
2 of 3
R
e
v
i
s
i
o
n
s
:
E
X
I
S
T
I
N
G
F
L
O
O
R
P
L
A
N
N
E
W
F
L
O
O
R
P
L
A
N
A
D
D
I
T
I
O
N
a
n
d
E
X
I
S
T
I
N
G
&
N
E
W
R
O
O
F
P
L
A
N
s
c
a
l
e
a
s
n
o
t
e
d
o
n
d
r
a
w
i
n
g
S
t
e
v
e
n
C
.
C
h
u
1
0
6
1
5
J
o
h
n
W
a
y
,
C
u
p
e
r
t
i
n
o
,
C
a
.
9
5
0
1
4
p
h
o
n
e
:
1
(
4
0
8
)
5
0
5
-
9
9
8
5
P
r
o
f
e
s
s
i
o
n
a
l
E
n
g
i
n
e
e
r
#
5
2
1
6
0
e
x
p
.
D
e
c
.
2
0
1
4
(E)
refrig.
(E) dw(E) sink
NEW FLOOR PLAN
scale: 1/4" = 1'-0"
(N) shower w/
tile floor, wall
surround & 2
temp dr. &
enclosure glazing
2
(E
)
r
i
d
g
e
(N
)
r
i
d
g
e
(N) v
a
l
l
e
y
(E) fireplace chimneys w/
spark arresters provide
(N) galv. sht. met. step
flash'g and crickets
(N) eyebrow roof
vents, typ.
(E) gable vents
(E) overhead elect.
service line, to
(E) location
(E) to utility pole
(
N
)
v
a
l
l
e
y
(E) water heater,
to remain BTU 38,000,
Man. date Nov. 2014
RHEEM Performance
Platinum M47141713
on +18" elevated
1 hr. platform
(E) CARRIER Series 151
high-efficiency 58RAV070.08
69,000 BTU Input
56,000 BTU Output
furnance, to remain
(E) 22"x30" attic
access location
(N) exter. wall
line, below
(N) eave vents, typ.
(N) gutter to match (E)
(N) ds to grade
(N) range exhaust
vents w/ rain caps
at (E) location
(E) 4 1/2 / 12
roof slope, verify(E) satellite t.v. dish
(N) gutter to match (E)
(N) ds to grade
(E) gutter
(E) ds
washer dryer
EXISTING FLOOR PLAN
scale: 1/8" = 1'-0"
EXISTING and NEW ROOF PLAN
scale: 1/8" = 1'-0"
(E)&(N)9'-6"(E)5'-0"(E)5'-0"(E)&(N)9'-6"
(N
)
1
2
'
-
1
"
o
p
e
n
i
n
g
(E) fireplace (E) fireplace
(N
)
5
'
-
1
0
"
(N
)
1
3
'
-
8
"
(N
)
5
'
-
7
"
(N
)
2
'
-
5
"
(N
)
1
1
'
-
7
1
/
2
"
(E) & (N)10'-1 1/2"
(
N
)
t
u
b
/
s
h
o
w
e
r
6
0
"
x
3
2
"
w
/
t
i
l
e
3
w
a
l
l
s
(
N
)
t
u
b
/
s
h
o
w
e
r
(E) sink
(E) dw
(E)
refrig.
(
N
)
t
u
b
/
s
h
o
w
e
r
6
0
"
x
3
2
"
w
/
t
i
l
e
3
w
a
l
l
s
(E) & (N)
3'-3"
(E) & (N)10'-1 1/2"(E) & (N)
3'-3"
(N) LINEN
(E
)
r
i
d
g
e
(
N
)
r
i
d
g
e
furnace & water
heater exhaust
vents w/ rain caps
verify (E) location
(N) to match (E) 4 1/2 / 12
roof slope, verify
(N) h
i
p
(N) h
i
p
(
N
)
h
i
p
(
N
)
h
i
p
(E) ridge
(E) h
i
p
(
E
)
h
i
p
(E) h
i
p
(
E
)
h
i
p
(E) v
a
l
l
e
y
(
E
)
v
a
l
l
e
y
(N) eyebrow roof
vents, typ.
(E) h
i
p
(
E
)
h
i
p
(E) 4 1/2 / 12
roof slope, verify
(E) gable vents
(E
)
g
a
b
l
e
(E
)
g
a
b
l
e
(E) skylight tube
(E) skylight tubes
(E) skylight tube
(N) eyebrow roof
vents, typ.
(N) rainwater diverter
at (E) location
(N) to match (E) 4 1/2 / 12
roof slope, verify
(N) eave overhang to
align with (E), verify
(E) gutter
(E) ds
(N) overhang
to match (E)
(N) overhang
to match (E)
(N) overhang
to match (E)
(E) exter. wall
line, below
(E) exter. wall
line, below
furnace & water
heater exhaust
vents w/ rain caps
verify (E) location
(E) exter. wall
line, below
(E) exter. wall
line, below
(N) eyebrow roof
vents, typ.
(N) eyebrow roof
vents, typ.
(N) eave vents,
typ.
(E) exter. conc. curb'g
to 24"x18" under floor
access location
(E) exter. conc.
curb'g to
24"x18"
under floor
access l
ocation
(E) 22"x30" attic
access location
(N) Class B asphalt comp. shingles, radiant barrier,
30 lbs. roof felt over 1/2" CDX plywod. roof sheathing w/
8d @ 6" o.c EN & 12" FN w/ flat 2x4 or H clips @ 24" o.c.
(E) exter. wall
line, below
A
D
D
A
L
T
E
R
N
A
T
E
1
Remove (E) wood shake roofing
and provide (N) per NOTE A
Remove (E) wood shake roofing
and provide (N) per NOTE A
Remove (E) wood shake roofing
and provide (N) per NOTE A
Remove (E) wood shake roofing
and provide (N) per NOTE A
(N) roofing
per NOTE A
(N) roofing
per NOTE A
(N
)
2
x
6
s
c
w
d
.
d
r
.
8
6
(
N
)
2
x
6
p
o
c
k
e
t
w
d
.
d
r
.
8
6
8
6
(E
)
2
x
6
w
d
.
d
r
.
B
A
S
E
B
I
D
8
6
(
N
)
2
x
6
s
c
w
d
.
d
r
.
84(N) 2 x 6
hc pocket dr.
1/2" undercut
(N) 8 pr. x full hgt.
sliding doors
0
(E) sliding wardrobe
doors to remain
(N
)
5
w
.
x
4
h
g
t
.
d
b
l
.
g
l
a
z
e
d
s
l
i
d
i
n
g
w
i
n
d
o
w
.
0
0
remove (E) window
& relocate
(N
)
3
w
.
x
2
h
g
t
.
d
b
l
.
g
l
.
,
s
l
i
d
'
g
o
b
s
c
u
r
e
w
i
n
d
o
w
.
0
0
(E
)
6
w
.
x
4
h
g
t
.
d
b
l
.
g
l
a
z
e
d
s
l
i
d
i
n
g
w
i
n
d
o
w
,
t
o
r
e
m
a
i
n
0
0
(E
)
6
w
.
x
4
h
g
t
.
d
b
l
.
g
l
a
z
e
d
s
l
i
d
i
n
g
w
i
n
d
o
w
,
t
o
r
e
m
a
i
n
0
0
(E) sliding wardrobe
doors to remain
(N
)
5
w
.
x
4
h
g
t
.
d
b
l
.
g
l
a
z
e
d
s
l
i
d
i
n
g
w
i
n
d
o
w
.
0
0
remove (E)
window &
relocate
relocated
(E) window
(
E
)
3
w
.
x
2
h
g
t
.
d
b
l
.
g
l
.
,
s
l
i
d
'
g
o
b
s
c
u
r
e
w
i
n
d
o
w
.
0
0
(
N
)
3
w
.
x
2
h
g
t
.
d
b
l
.
g
l
.
,
s
l
i
d
'
g
o
b
s
c
u
r
e
w
i
n
d
o
w
.
0
0
84(N) 2 x 6
hc wd. dr.
1/2" undercut
(N) 8 pr. x full hgt.
sliding doors
0
relocated (E) 6 w. x 4 hgt.
dbl. glazed sliding window.
00
relocated
(E) window
relocate
(E) window
relocated (E) 6 w. x 4 hgt.
dbl. glazed sliding window.
00
(N) 5 pr. x full hgt.
sliding doors
0
84(N) 2 x 6
hc wd. dr.
1/2" undercut
84(N) 2 x 6
hc wd. dr.
1/2" undercut
(
E
)
3
w
.
x
2
h
g
t
.
d
b
l
.
g
l
.
,
s
l
i
d
'
g
o
b
s
c
u
r
e
w
i
n
d
o
w
.
0
0
86(N) 2 x 6
hc pocket dr.
(E) wd.
door
(
E
)
p
o
c
k
e
t
w
d
.
d
o
o
r
(E) wd.
door
(E) wd.
door
(
N
)
d
b
l
.
g
l
.
b
a
y
w
i
n
d
o
w
,
w
/
5
w
.
x
4
h
g
t
.
s
l
i
d
'
g
c
e
n
t
e
r
u
n
i
t
&
1
x
4
h
g
t
.
f
i
x
e
d
u
n
i
t
s
e
a
.
s
i
d
e
.
30°
1'-0"
0
0
0
0
3'
-
0
"
5'
-
0
"
20
'
-
2
"
i
n
t
e
r
i
o
r
d
i
m
e
n
s
i
o
n
co
n
f
o
r
m
i
n
g
r
e
q
u
i
r
e
m
e
n
t
19'-4" interior dimension
remain non-conforming
13.4 sq. ft. reserved for
a future garage upgrade
20
'
-
2
"
i
n
t
e
r
i
o
r
d
i
m
e
n
s
i
o
n
co
n
f
o
r
m
i
n
g
r
e
q
u
i
r
e
m
e
n
t
19'-4" interior dimension
remain non-conforming
13.4 sq. ft. reserved for
a future garage upgrade
1
5
/
1
1
/
1
5
P
l
a
n
n
i
n
g
D
i
v
i
s
i
o
n
p
r
e
l
i
m
.
r
e
v
i
e
w
p
i
c
k
u
p
s
a
n
d
r
e
v
i
s
i
o
n
s
M
i
n
o
r
A
r
c
h
i
t
e
c
t
u
r
a
l
a
n
d
S
i
t
e
A
p
p
r
o
v
a
l
(
A
S
A
)
1404
April 27, 2015
1
A-3
2
A-3
5
A-3
6
A-3
3
A-3
4
A-3A-3
4A
M
r
.
&
M
r
s
.
C
h
u
n
H
.
N
g
2
2
3
7
2
-
2
2
3
7
4
M
c
C
l
e
l
l
a
n
R
o
a
d
,
C
u
p
e
r
t
i
n
o
,
C
a
l
i
f
o
r
n
i
a
9
5
0
1
4
C
o
u
n
t
y
o
f
S
a
n
t
a
C
l
a
r
a
,
A
P
N
:
3
5
6
-
0
4
-
0
2
7
E
x
i
s
t
i
n
g
D
u
p
l
e
x
R
e
s
i
d
e
n
t
i
a
l
A
d
d
i
t
i
o
n
a
n
d
R
e
m
o
d
e
l
f
o
r
:
(N) gutter
& downspout
(N) Main elect.
panel & Meter
200 amp service
(N) dbl. gl. sliding
windows
(E) conc. driveway
(E) sectional roll-up
garage dr. with
auto. opener
(N) exter. cem plaster
w/ met trim, weep
screed & corner
reinf. finish to match
existing, typ.
(E) conc. step
(N) provide smooth transition
between (E) and (N) cement
plaster surfaces.
(E) sectional roll-up
garage dr. with
auto. opener
(N) provide smooth transition
between (E) and (N) cement
plaster surfaces.
(E) conc. driveway
(N) conc. step
(E) dbl. gl. sliding
windows
(E) dbl. gl. sliding
windows
(N) dbl. gl. sliding
window
(N) dbl. gl. sliding
windows w/ wd. trim
(E) brick veneer
(N) asphalt shingle roofing
approx. grade line
(N) exter. cem.
plaster w/ weep
screed , met. trim
& corner reinf. typ.
(N) gutter and downspout
(E) 2x wd. gable fascia trim
(E) conc. walkway
(N) asphalt shingle roofing
approx. grade line
approx. grade line
(E) brick veneer
(E) wd. board &
batten siding
(N) gutter
& downspout
(N) exter. cem plaster
w/ met trim, weep
screed & corner
reinf. finish to match
existing, typ.
(N) gutter and downspout
(N) asphalt shingle roofing
(N) crawl
space vents
(E) crawl
space vents
(N) crawl
space vents
approx. grade line
(N) crawl
space vents
(N) gutter
& downspout
(E) fnd. vents
(E) fnd. vents
(N) dbl. gl. sliding
windows
(N) gutter
& downspout
(N) exter. cem.
plaster w/ weep
screed , met. trim
& corner reinf. typ.
(N) crawl
space vents
(E) cement plaster
(E) 2x wd. gable fascia trim
(E) brick veneer
(E) wd. board &
batten siding
(N) gutter
& downspout
(N) asphalt shingle
roofing
(N) Main elect.
panel & Meter
200 amp service
(N) provide smooth transition
between (E) and (N) cement
plaster surfaces.
(E) dbl. gl. sliding
windows
(N) dbl. gl. sliding
window
(N) crawl
space vents
(N) exter. cem.
plaster w/ weep
screed , met. trim
& corner reinf. typ.
A
r
c
h
i
t
e
c
t
u
r
a
l
D
e
s
i
g
n
&
D
r
a
f
t
i
n
g
S
e
r
v
i
c
e
T
-
S
q
.
D
e
s
i
g
n
6
1
4
9
G
e
r
o
n
i
m
o
D
r
.
,
S
a
n
J
o
s
e
,
C
a
l
i
f
.
9
5
1
2
3
p
h
o
n
e
&
f
a
x
:
1
(
4
0
8
)
2
2
5
-
2
5
3
3
D
a
v
i
d
D
.
W
a
r
r
e
n
,
P
r
i
n
c
i
p
a
l
Date:
Drawn By:
Job Number:
A-3
Sheet Number:
3 of 3
R
e
v
i
s
i
o
n
s
:
E
X
T
E
R
I
O
R
E
L
E
V
A
T
I
O
N
S
s
c
a
l
e
a
s
n
o
t
e
d
o
n
d
r
a
w
i
n
g
(E) overhead
elect. service
line, to (E)
location
(E) to utility pole
EAST ELEVATION
WEST ELEVATION
(E) gable vent
(N) dbl. glazed, temp.
sliding door
(N) top plate
(N) gutter & ds
(N) eyebrow roof
vents, typ.
(N) eyebrow roof
vents, typ.
(E) skylight tubes
(E) exter. conc. curb'g
to 24"x18" under floor
access location
(N) dbl. glazed, temp.
sliding door
(E) exter. conc. curb'g
to 24"x18" under floor
access location
(N) eyebrow roof
vents, typ. (N) eyebrow roof
vents, typ.
(E) skylight tubes
(E) fireplace chimneys w/
spark arresters provide
(N) galv. sht. met. step
flash'g and crickets
(N) eyebrow roof
vents, typ.
(E) gable vent
(N) eyebrow roof
vents, typ.
NORTH ELEVATION
SOUTH ELEVATIONCOURT WEST ELEVATION
COURT EAST ELEVATION
scale: 1/4" = 1'-0" scale: 1/4" = 1'-0"
scale: 1/4" = 1'-0" scale: 1/4" = 1'-0"
scale: 1/4" = 1'-0"
scale: 1/4" = 1'-0"
(E) overhead
elect. service
line, to (E)
location
(E) exter. conc. curb'g
to 24"x18" under floor
access location
WEST ELEVATION - AT ADD ALTERNATE 1
scale: 1/4" = 1'-0"
1
5
/
1
1
/
1
5
P
l
a
n
n
i
n
g
D
i
v
i
s
i
o
n
p
r
e
l
i
m
.
r
e
v
i
e
w
p
i
c
k
u
p
s
a
n
d
r
e
v
i
s
i
o
n
s
M
i
n
o
r
A
r
c
h
i
t
e
c
t
u
r
a
l
a
n
d
S
i
t
e
A
p
p
r
o
v
a
l
(
A
S
A
)
1'
-
2
"
(N
)
&
(
E
)
8
'
-
1
"
(N
)
3
'
-
1
"
v
e
r
i
f
y
(E
)
1
6
'
-
0
"
v
e
r
i
f
y
1'
-
2
"
(N
)
&
(
E
)
8
'
-
1
"
(N
)
3
'
-
1
"
v
e
r
i
f
y
(N) dbl. gl. bay window,
w/ 5 w. x 4 hgt. slid'g
center unit & 1 x 4 hgt.
fixed units ea. side.
00
00
1404
April 27, 2015
1
A-3
2
A-3
3
A-3
4
A-3
5
A-3
6
A-3
4A
A-3
S
t
e
v
e
n
C
.
C
h
u
1
0
6
1
5
J
o
h
n
W
a
y
,
C
u
p
e
r
t
i
n
o
,
C
a
.
9
5
0
1
4
p
h
o
n
e
:
1
(
4
0
8
)
5
0
5
-
9
9
8
5
P
r
o
f
e
s
s
i
o
n
a
l
E
n
g
i
n
e
e
r
#
5
2
1
6
0
e
x
p
.
D
e
c
.
2
0
1
4
(E) & (N) top plate
(E) & (N) floor line
(N) ridge line
approx. grade line
(E) ridge line
(N) patio
12
4 1/2 (N)
verify
12
4 1/2 (E)
verify
(E) & (N) top plate
(E) ridge line
12
4 1/2 (E)
verify
12
4 1/2 (E)
verify
12
4 1/2 (E)
verify
12
4 1/2 (N)
verify
12
4 1/2 (E)
verify12
4 1/2 (N)
verify
(E) & (N) top plate
(N) ridge line
(E gable
(E) ridge line
(E) & (N) floor line
(E) sl. gl. dr. (dbl. pane)
(E) & (N) top plate
(E) & (N) floor line
(N) ridge line
approx. grade line
(E) ridge line
12
4 1/2 (E)
verify
(E) & (N) floor line
(N) ridge line
(E) ridge line
12
4 1/2 (E)
verify
(E) & (N) top plate
(E) & (N) floor line
approx. grade line
ADMINISTRATIVE HEARINGSTAFF REPORT
Agenda Item No. Agenda Date:June 11, 2015
Application: ASA-2015-06
Applicant:Deepak Chandani(Sinha/Thawani Residence)
Project Location:21891 Granada Avenue(APN 357-16-156)
APPLICATION SUMMARY
Architectural and Site Approval(ASA-2015-06)to allow the construction of a new 3,017 square
foot, two-story single-family residence in a Planned Development Zone.
RECOMMENDATION
Staff recommends that the Hearing Officer approvethe Architectural and Site Approval (ASA-
2015-06) per the draft resolution.
PROJECT DATA:
General Plan Designation Residential (4.4-12 DU/Acre)
Zoning Designation P (Res 4.4-12)
Existing/Proposed Land Use Single Family home
Lot Size 6,714 square feet (0.15 acres)
Allowed/Required Proposed
F.A.R. (max. 45%)3,021 (3,017) 44.93%
Lot Coverage (max. 45%+5%for
eavesand covered patios)3,357 (2,465) 36.71%
1st Floor Setbacks (corner lot)
Front & Rear 20’20’
Street Side 12’17’
Interior Side 5’5’
2nd Floor Setbacks (corner lot)
Front & Rear 25’25’/28’-6”
Street Side 12’23’
Interior Side 10’ with Design Review or
15’ with Two-Story permit 20’-6”
OFFICE OF COMMUNITY DEVELOPMENT
CITY HALL
10300 TORRE AVENUE •CUPERTINO, CA 95014-3255
(408) 777-3308 • FAX (408) 777-3333 • planning@cupertino.org
ASA-2015-06 21891 Granada Avenue June 11, 2015
Page 2
BACKGROUND
The proposed project is located at the northeast
corner of the intersection of Granada Avenue and
Minaker Courtin the Monta Vista Neighborhood.
The project is located in a residential neighborhood
with single family and small lot single family
residences zoned with various designations. To the
westand north are planned development single-
family residences zoned P(R1),to the northwest are
single-family cluster residences zoned R1C, to the
south are single-family residenceszoned R1-7.5, and
to the east are planned development residential small
lot residences zoned P(Res 4.4-12).
The project is located on the southern lot of a two-lot
subdivision approved by the Planning Commission.
The 2006 decision approved the creation of two
parcels and the construction of a two-story single family residence with a reduced rear yard
setback on the northern lot (U-2006-12, ASA-2006-21, and TM-2006-11).
DISCUSSION
The applicant, Deepak Chandani, representing the property owner Sharad Sinha and Darpan
Thawaniis proposing a new 3,017 square foot single-family residenceto replace an existing
2,334square foot home on the property.According to the Municipal Code Chapter 19.12, a new
single family homein the Planned Development zoning district requires Architectural and Site
Approval by the Director of Community Development or his/her designee at an Administrative
Hearing in order to assure a high degree of architectural quality and to address other
development issues.
The proposal for a new two story home is architecturally consistent with the other homes on
surroundingproperties. The proposed home has adequate parking and has setbacks and
materials that are consistent with surrounding properties with similar use. Therefore, the
Second to First Floor Ratio > 66% with Design Reviewor
≤66% with Two-story permit 43.94%
Total Building Height Max. 28’24’
Parking Required 4 total (2 enclosed &
2 open 20’ by 20’ spaces)
4 (2 in 20’ by 20’ enclosed
garage &2open)
Project Consistency with:
General Plan Yes
Specific Plan Yes
Environmental Review Categorically Exempt per Section 15303, Class 3 of the
California Environmental Quality Act (CEQA)
SITE VICINITY AERIAL
M
IN
AK
E
R
C
T
BYRNE AVE
BYRNE CT
GRANADA AVE
STEVENS CREEK BLVD
ASA-2015-06 21891 Granada Avenue June 11, 2015
Page 3
proposal is harmonious in scale, architectural style, colors, and materials choice to the
surrounding properties. In addition, the proposalacknowledges potential privacy impacts by
proposingsecond story windows that meet the requirements of the R1 zoningdistrict for
privacy protection. Where second story windows do not meet theR1standards for privacy
protection, the applicant is providing privacy protection through planting materials consistent
with the approved privacy screening materials list.
Theproposedsingle-family residence will not be detrimental or injurious to property or
improvements in the surrounding area and will not be detrimental to the public health, safety,
general welfare, or convenience.The project is consistent withthe General Plan and the
underlying zoning standards ofR-1Ordinance (i.e. lot coverage, setbacks, building height,
privacy mitigation measuresetc.) since a single family home is being proposed.
OUTREACH/NOTICING
The following table is a brief summary of the noticing done for this project:
Notice of Public Meeting & Site Signage Agenda
Posted on the site (10 days prior to hearing)
12notices mailed to property owners
adjacent to the project site (10 days prior to
hearing)
Posted on the City's official notice
bulletin board (one weekprior to hearing)
Posted on the City of Cupertino’s Web
site (one weekprior to hearing)
PERMIT STREAMLINING ACT
This matter is adjudicatory and is subject to the Permit Streamlining Act (Government Code
Section 65920 –65964). The City has complied with the deadlines found in the Permit
Streamlining Act.
Project Received: February 25, 2015; Deemed Incomplete: March 25, 2015
Project Resubmittal: April 19, 2015; Deemed Incomplete: April 20, 2015
Project Resubmittal: May 27, 2015; Deemed Complete: May 28, 2015
Since this project is Categorically Exempt, the City has 60 days (until July 28, 2015) to make a
decision on the project. The Hearing Officer’s decision on this project is final unless appealed
within 14 calendar days of the decision.
CONCLUSION
Staff recommends approval of the Architectural and Site Approval, since the plans and
conditions of approval address all concerns related to the proposedproject. Additionally, all of
the findingsfor approval of the proposed project, consistent with Chapter 19.168 of the
Cupertino Municipal Code, may be madeas reflected in the Draft Resolution.
Submittedby:EllenYau, AssistantPlanner
Reviewed by: Piu Ghosh, Senior Planner
ASA-2015-06 21891 Granada Avenue June 11, 2015
Page 4
Attachments
DraftResolution
Plan Set
ASA-2015-06
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
DRAFT RESOLUTION
OF THE ADMINISTRATIVE HEARING MEETINGOF THE CITY OF CUPERTINO
FOR AN ARCHITECTURALAND SITE APPROVALTO ALLOW THE CONSTRUCTION
OF A NEW 3,017 SQUARE FOOT, TWO-STORY SINGLE-FAMILY RESIDENCE
IN A PLANNED DEVELOPMENT ZONE
SECTION I: PROJECT DESCRIPTION
Applicant:Deepak Chandani
Property Owner: Sharad Sinha and Darpan Thawani
Location:21891 Granada Avenue (APN 357-16-156)
SECTION II: FINDINGS
WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an application
to allow an Architectural and Site Approval to allow the construction of a new 3,017 square
foot, two-story single-family residence in a planned development zone;
WHEREAS, the necessary public notices have been given as required by the Procedural
Ordinance of the City of Cupertino, and the Administrative Hearing Officerhas held at least
one public meeting in regard to the application; and
WHEREAS, the applicant has met the burden of proof required to support said application; and
WHEREAS, the Administrative Hearing Officerfinds:
1.The proposal, at the proposed location, will not be detrimental or injurious to property or
improvements in the vicinity, and will not be detrimental tothe public health, safety,
general welfare, or convenience;
The applicant is proposing a new two story single-family residence on property that has an existing
single-family home and is also proposing setbacks, parking totals, and building height consistent with
the surrounding properties and uses. The project is not detrimental to the public health, safety,
general welfare or convenience.
2.The proposal is consistent with the purposes of Chapter 19.168, Architectural and Site
Review, of the Cupertino Municipal Code, the General Plan, any specific plan, zoning
ordinances, applicable planned development permit, conditional use permits, variances,
subdivision maps or other entitlements to use which regulate the subject property
including, but not limited to, adherence to the following specific criteria:
Draft Resolution ASA-2015-06 June 11, 2015
Page 2
a)Abrupt changes in building scale should be avoided.A gradual transition related to height
and bulk should be achieved between new and existing buildings;
The proposed structure will replace an existing single story home therefore there will be an increase
in the height of the new building. However, most of the properties surrounding the subject site have
existing two story homes. Therefore, the new proposal will not cause any abrupt changes in building
scale with the neighboring properties. The proposed home itself is aesthetically designed and avoids
abrupt changes in scale.Therefore, the proposed residencematchesthe scale of the existing
neighborhood pattern.
b)In order to preserve design harmony between new and existing buildings and in order to
preserve and enhance property values, the materials, textures and colors of new buildings
should harmonize with adjacent development by being consistent or compatible with design
and color schemes, and,with the future character of the neighborhood and purposes of the
zone in which they are situated. The location, height and materials of walls, fencing, hedges
and screen planting should harmonize with adjacent development. Unsightly storage areas,
utility installations and unsightly elements of parking lots should be concealed. The planting
of ground cover or various types of pavements should be used to prevent dust and erosion,
and the unnecessary destruction of existing healthy trees should be avoided.Lighting for
development should be adequate to meet safety requirements as specified by the engineering
and building departments, and provide shielding to prevent spill-over light to adjoining
property owners;
The proposed architectural design, materials choice, and other exterior treatments are compatible with
the character and future character of the neighborhood. Location of fencing and landscaping are
situated within required setbacks, beyond visibility clearancesand are harmonious with the residential
use. Theproposal has been designed to meet the R1 Single Family Residence Ordinance and does not
propose to locate unsightly storage, utility units, and or parking lots visible to the public right-of-way.
The proposed lighting is limited to residential use and will minimize spill-over light uncommon in
residential neighborhoods.
c)The number, location, color, size, height, lighting and landscaping of outdoor advertising
signs and structures shall minimize traffic hazards and shall positively affect the general
appearance of the neighborhood and harmonize with adjacent development; and
No signage or outdoor advertising is proposed by the project.
d)With respect to new projects within existing residential neighborhoods, new development
should be designed to protect residents from noise, traffic, light and visually intrusive effects
by use of buffering, setbacks, landscaping, walls and other appropriate design measures.
The project is located within an existing residential neighborhood and the proposed home has been
designed to respect the privacy of the neighbors. The proposal meets the requirements stipulated in the
R1 Single Family Residence Ordinance in order to provide the same level of privacy for the neighbors
Draft Resolution ASA-2015-06 June 11, 2015
Page 3
as in Single Family Zoning Districts by having sill heights of windows on the second floor either above
5 feet or having fixed obscure windows or planting privacy trees to provide screening to the neighbors.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted
in this matter, subject to the conditions which are enumerated inSection III, IVand V ofthis
Resolution beginning on Page 3 thereof,the Application No. ASA-2015-06is hereby approved;
andthat the sub-conclusionsupon which the findings and conditions specified in this Resolution
are based and contained in the public hearing record concerning Application ASA-2015-06as set
forth in the Minutes of the Administrative HearingMeeting of June11, 2015, and are
incorporated by referenceas though fully set forthherein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT
DEPARTMENT
1.APPROVED EXHIBITS
Approval is based on the plan set entitled, “Proposed Single Family House for Anthem
Green Developers, Inc.”, consisting of twelve(12) sheets labeled1-10, and L1-L2, dated May
27, 2015,except as may be amended by conditions in this resolution.
2.ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data including
but not limited to property boundary locations, building setbacks, property size, building
square footage, any relevant easements and/or construction records. Any misrepresentation
of any property data may invalidate this approval and may require additional review.
3.CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with regard
to the proposed project for additional conditions and requirements. Any misrepresentation
of any submitted data may invalidate an approval by the Community Development
Department.
4.EXTERIOR BUILDING MATERIALS/TREATMENTS
Final building exterior treatment plan (including but not limited to details on exterior color,
material, architectural treatments and/or embellishments)shall be reviewed and approved
by the Director of Community Development prior to issuance of building permits. The final
building exterior plan shall closely resemble the details shown on the original approved
plans. Any exterior changes determined to be substantial by the Director of Community
Development shall require a modification approval with neighborhood input.
5.PRIVACY PROTECTION
The final privacy-planting plan shall be reviewed and approved by the Planning Division
prior to issuance of building permits. The variety, size, planting distance shall be consistent
with the City’s requirements.
Draft Resolution ASA-2015-06 June 11, 2015
Page 4
6.PRIVACY PROTECTION COVENANT
The property owner shall record a covenant on this property to inform future property
owners of the privacy protection measures and tree protection requirements consistent with
the requirements of the R-1 Ordinance, for all windows with views into neighboring yards
and a sill height that is 5 feet or less from the second story finished floor.The precise
language will be subject to approval by the Director of Community Development.Proof of
recordation must be submitted to the Community Development Department prior to final
occupancy of the residence.
7.LANDSCAPE PROJECT SUBMITTAL
Prior to issuance of building permits, the applicant shall submit a full landscape project
submittal per sections 14.15.040 A, B, C, and D of the Landscaping Ordinance if more than
2,500 square feet of landscaping area is proposed. The Water-Efficient Design Checklist
(Appendix A of Chapter 14.15), Landscapeand Irrigation Design Plans, and Water Budget
Calculations shall be reviewed and approved to the satisfaction of the Director of
Community Development prior to issuance of building permits.
8.INDEMNIFICATION
Except as otherwise prohibitedby law, the applicant shall indemnify and hold harmless the
City, its City Council,andits officers, employees and agents (collectively,the “indemnified
parties”) from and against any claim, action, or proceeding brought by a third party
againstone or more of theindemnified partiesor one or more of the indemnified
partiesand the applicant to attack, set aside, or void this Resolution or any permit or
approval authorized hereby for the project, including (without limitation) reimbursing the
City its actualattorneys’ fees and costs incurred in defense of the litigation. Theapplicant
shall paysuch attorneys’ fees and costswithin 30 daysfollowingreceipt of invoices from
City. Suchattorneys’ fees and costsshall include amountspaid to counsel not otherwise
employed as City staff and shall include City Attorney time and overhead costs and other
City staff overhead costs and any costs directly related to the litigation reasonably incurred
by City.
9.NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees, dedication
requirements, reservation requirements, and other exactions. Pursuant to Government
Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the
amount of such fees, and a description of the dedications, reservations, and other exactions.
You are hereby further notified that the 90-day approval period in which you may protest
these fees, dedications, reservations, and other exactions, pursuant toGovernment Code
Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying
with all of the requirements of Section 66020, you will be legally barred from later
challenging such exactions.
Draft Resolution ASA-2015-06 June 11, 2015
Page 5
SECTION IV: CONDITIONS ADMINSTERED BY THE PUBLIC WORKS DEPARTMENT
10.CURB AND GUTTER IMPROVEMENTS
Curbs and gutters, sidewalks and related structures shall be installed in accordance with
grades and standards as specified by the City Engineer.
11.GRADING
Grading shall be as approved and required by the City Engineer in accordance with Chapter
16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits maybe required.
Please contact Army Corp of Engineers and/or Regional Water Quality Control Board as
appropriate.
12.UNDERGROUNDUTILITIES
Developer shall comply with the requirements of the Underground Utilities Ordinance No.
331 and other related Ordinances and regulations of the City of Cupertino, and shall
coordinate with affected utility providers for installation of underground utility devices.
Developer shallsubmit detailed plans showing utility underground provisions. Said plans
shall be subject to prior approval of the affected Utility provider and the City Engineer.
13.WATER BACKFLOW PREVENTERS
Domestic and Fire Water Backflow preventers and similar above ground equipment shall be
placed away from the public right of way and site driveways to a location approved by the
Cupertino Planning Department, Santa Clara County Fire Department and the water
company.
14.BEST MANAGEMENTPRACTICES
Utilize Best Management Practices (BMPs), as required by the State Water Resources
Control Board, for construction activity, which disturbs soil. BMP plans shall be included in
grading and street improvement plans.
15.EROSION CONTROL PLAN
Developer shall provide an approved erosion control plan by a Registered Civil Engineer.
This plan should include all erosion control measures used to retain materials on site.
Erosion control notes shall be stated on the plans.
16.WORK SCHEDULE
Every 6 months, the developer shall submit a work schedule to the City to show the
timetable for all grading/erosion control work in conjunction with this project.
17.STREET TREES
Street trees shall be planted within the Public Right of Way to the satisfaction of the City
Engineer and shall be of a type approved by the City in accordance with Ordinance No. 125.
Draft Resolution ASA-2015-06 June 11, 2015
Page 6
18.DEDICATION OF UNDERGROUND WATER RIGHTS
Developer shall “quit claim” to the City all rights to pump, take or otherwise extract water
from the underground basin or any underground strata in the Santa Clara Valley.
19.SAN JOSE WATER COMPANY CLEARANCE
Provide San Jose Water Company approval for water connection, service capability and
location and layout of water lines and backflow preventers before issuance of a building
permit approval.
20.SANITARY DISTRICT
A letter of clearance for the project shall be obtained from the Cupertino Sanitary District
prior to issuance of building permits.
SECTION V: CONDITIONS ADMINSTERED BY THE FIRE DEPARTMENT
21.REVIEW
Review of this Developmental proposal is limited to acceptability of site access and water
supplyas they pertain to fire department operations, and shall not be construed as a
substitute for formal plan review to determine compliance with adopted model codes. Prior
to performing any work the applicant shall make application to, and receive from, the
Building Department all applicable construction permits.
22.FIRE SPRINKLERS REQUIRED
An automatic residential fire sprinkler system shall be installed in one-and two-family
dwellingsasfollows: in all new one-and two-family dwellings and in existing one-and
two-family dwellings when additions are made that increase the building area to more than
3,600 square feet. The owner(s), occupant(s) and any contractor(s) or subcontractor(s) are
responsible for consulting with the water purveyor of record in order to determine if any
modification or upgrade of the existing water service is required. A State of California
licensed (C-16) Fire Protection Contractor shall submit plans, calculations,a completed
permit application and appropriate fees to this department for review and approval prior to
beginning their work.
23.WATER SUPPLY REQUIREMENTS
Potable water supplies shall be protectedfrom contamination caused by fire protection
water supplies.It is the responsibility of the applicant and any contractors and
subcontractors to contact the water purveyor supplying the site of such project, and to
comply with the requirements of that purveyor. Such requirements shall be incorporated
into the design of any water-based fire protection systems, and/or fire suppression water
supply systems or storage containers that may be physicallyconnected in any manner to an
appliancecapable of causing contamination of the potable water supply of the purveyor
record. Final approval of the system(s) under consideration will not be granted by this office
until compliance with the requirements of the water purveyor of record are documented by
that purveyor as having been met by the applicant(s).
Draft Resolution ASA-2015-06 June 11, 2015
Page 7
24.CONSTRUCTION SITE FIRE SAFETY
All construction sites must comply with applicable provisions of the CFC Chapter 33 and
Standard Detail and Specification SI-7. Provide appropriate notations on subsequent plan
submittals, as appropriate to the project.
25.ADDRESS IDENTIFICATION
New and existing buildings shall have approved address numbers, building numbers or
approved building identification placed in a position that is plainly legible and visible from
the street or road fronting the property. These numbers shall contrast with their
background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers
shall be a minimum of 4 inches (101.6 mm) high with a minimum stroke width of 0.5 inch
(12.7 mm).
PASSED AND ADOPTED this 11th day of June, 2015 at a noticed Public Meeting of the
Administrative Hearing Officer of the City of Cupertino, State of California, held by the
Director of Community Development, or his or her designee, pursuant to Cupertino Municipal
Code Section 19.12.120.
ATTEST:APPROVED:
Ellen Yau Gary Chao
Assistant Planner Asst. Director of Community Development
Anthem Green Developers, Inc.
21891 Granada Avenue
Proposed Single Family House
Cupertino, California
For
APN No.: 357-16-156
/+
0
#
-
'
4
%
1
7
4
6
)4#0#&##8'07'
/+
0
#
-
'
4
%
1
7
4
6
)4#0#&##8'07'
GENERAL NOTES:
1.ALL WORK SHALL BE IN ACCORDANCE WITH THE STATE OF CALIFORNIA-DEPARTMENT OF TRANSPORTATION STANDARD
SPECIFICATIONS (LATEST EDITION, AS AMENDED) AND STANDARD PLANS (LATEST EDITION, AS AMENDED) AND CITY OF CUPERTINO
STANDARD DETAILS. THE CONTRACTOR SHALL PERFORM THE WORK DESCRIBED IN THE SPECIFICATIONS, AND AS SHOWN ON THE
DRAWINGS, AND TO THE SATISFACTION OF THE CITY ENGINEER.
2.APPROVAL OF THESE PLANS SHALL NOT RELEASE THE OWNER OR CONTRACTOR OF THE RESPONSIBILITY FOR CORRECTIONS OR
MISTAKES, ERRORS, OR OMISSIONS CONTAINED THEREIN. IF DURING THE COURSE OF CONSTRUCTION OF IMPROVEMENTS, PUBLIC
INTEREST REQUIRES A MODIFICATION OF/ OR A DEPARTURE FROM CITY OF CUPERTINO STANDARD DETAILS OR THESE IMPROVEMENT
PLANS, THE CITY ENGINEER SHALL HAVE THE AUTHORITY TO REQUIRE SUCH MODIFICATIONS OR DEPARTURE AND TO SPECIFY THE
MANNER IN WHICH THE SAME IS TO BE COMPLETED, AT THE SOLE EXPENSE OF THE OWNER OR CONTRACTOR.
3.THE CONTRACTOR SHALL NOTIFY THE CITY OF CUPERTINO PUBLIC WORKS INSPECTOR TWO WORKING DAYS PRIOR TO REQUIRING AN
INSPECTION. CALL 408-777-3104 TO SCHEDULE PUBLIC WORKS INSPECTIONS.
4.ALL PUBLIC IMPROVEMENTS SHALL BE COMPLETED PRIOR TO OCCUPANCY.
5.CONTRACTOR IS RESPONSIBLE FOR DUST CONTROL AND ENSURING THE AREA ADJACENT TO THE WORK IS LEFT IN A CLEAN
CONDITION.
6.UTILIZE BEST MANAGEMENT PRACTICES (BMP's), AS REQUIRED BY THE STATE WATER RESOURCES CONTROL BOARD, FOR ANY ACTIVITY,
WHICH DISTURBS THE SOIL.
7.A WORK SCHEDULE OF GRADING AND EROSION & SEDIMENT CONTROL PLAN SHALL BE PROVIDED TO THE CITY ENGINEER BY AUGUST
15. NO HILLSIDE GRADING SHALL BE PERFORMED BETWEEN OCTOBER 1 TO APRIL 15.
8.ALL NEW ELECTRICAL SERVICE (POWER, PHONE AND OR CABLE) SHALL BE UNDERGROUND.
9.TO INITIATE RELEASE OF BONDS, CONTACT THE PUBLIC WORKS INSPECTOR FOR FINAL INSPECTION.
10.ALL DOWNSPOUTS TO BE RELEASED TO THE GROUND SURFACE, DIRECTED AWAY FROM THE BUILDING FOUNDATIONS AND DIRECTED
TO THE LANDSCAPE AREAS.
11.PRIOR TO BEGINNING ANY WORK WITHIN THE PUBLIC RIGHT OF WAY, THE CONTRACTOR WILL BE RESPONSIBLE FOR PULLING AN
ENCROACHMENT PERMIT FROM THE PUBLIC WORKS DEPARTMENT.
12.APPROVAL OF THESE PLANS BY THE CITY ENGINEER IS ONLY FOR PUBLIC RIGHT OF WAY IMPROVEMENTS AND NOT FOR WATER, SEWER
OR DRY UTILITIES. IT IS THE DEVELOPER'S/ OWNER'S RESPONSIBILITY TO COORDINATE REVIEWS AND APPROVAL FROM EACH OF THE
UTILITY COMPANIES, AND TO PROVIDE APPROVAL LETTERS AS REQUESTED/ NEEDED.
13.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THE APPROVED PLANS OR THE LATEST REVISED PLANS ARE FURNISHED
TO THE SUB-CONTRACTORS, AND TO ENSURE THE LATEST APPROVED PLANS ARE ONSITE AT ALL TIMES DURING CONSTRUCTION.
14.CONSTRUCTION AREA TRAFFIC CONTROL DEVICES SHALL BE INSTALLED, AS NEEDED, PRIOR TO BEGINNING OF WORK.
15.THE CONTRACTOR SHALL LOCATE UNDERGROUND FACILITIES IN THE AREA OF WORK. THE CONTRACTOR SHALL CONTACT
UNDERGROUND SERVICE ALERT (USA) AT 811 TWO WORKING DAYS IN ADVANCE OF ANY WORK FOR LOCATION OF THE
UNDERGROUND FACILITIES.
16.ALL TRENCH BACKFILL, FILL AREAS, AND BASE MATERIAL SHALL ATTAIN A MINIMUM 95% RELATIVE COMPACTION. FOR TYPICAL TRENCH
SECTIONS, EXCEPT FOR SANITARY SEWERS, REFER TO THE CITY STANDARD DETAILS.
17.THE DEVELOPER SHALL PAY ALL COSTS FOR MOISTURE DENSITY CURVES (CALIFORNIA TEST NO. 216E) AND ANY OTHER TESTS REQUIRED
BY THE CITY ENGINEER FOR ALL WORK ON THE STREET.
18.TREES, ROOTS, AND FOREIGN MATTER IN EXISTING OR PROPOSED RIGHT-OF-WAY SHALL BE REMOVED TO A DEPTH OF TWO FEET BELOW
SUB-GRADE AND DISPOSED OF PER CALTRANS STANDARDS. IN THE CASE OF LIVE TREE ROOTS FROM CITY STREET TREES, CONTRACTOR
SHALL CONTACT THE CITY FOR FIELD OBSERVATION PRIOR TO REMOVING TREE ROOTS.
19.TRENCH PLATES, IF REQUIRED, IN THE TRAVELED WAY SHALL BE TRAFFIC RATED, PROPERLY SECURED AND SHALL BE RECESSED UPON THE
REQUEST OF THE DIRECTOR OF PUBLIC WORKS.
20.ALL TRENCHES LOCATED WITHIN 5 FEET OF THE EDGE OF PAVEMENT (i.e CURB, LIP OF GUTTER, EDGE OF PAVEMENT ETC.) SHALL BE
RE-PAVED TO THE EDGE OF PAVEMENT.
21.EXISTING PAVEMENT THAT IS REMOVED OR DAMAGED SHALL BE REPLACED AS REQUIRED BY THE CITY ENGINEER.
22.CONCRETE FOR USE IN ALL CONCRETE STRUCTURES SHALL CONFORM TO CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD
SPECIFICATIONS SECTION 90. DROP INLETS, SIDEWALKS, CURBS AND GUTTERS SHALL CONTAIN 590 LBS OF CEMENT PER CUBIC YARD
AND SHALL ATTAIN A MINIMUM STRENGTH OF 3,000 PSI IN 28 DAYS.
23.A MINIMUM THICKNESS OF FIVE INCHES OF CONCRETE SHALL BE REQUIRED FOR COMMERCIAL DRIVEWAY APPROACHES AND FOUR
INCHES FOR RESIDENTIAL. THE DRIVEWAY APPROACH SHALL BE INSTALLED CONCURRENT WITH THE CONSTRUCTION OF THE CURB AND
GUTTER.
24.ONE POUND OF DISPERSING BLACK SHALL BE MIXED WITH EACH CUBIC YARD OF CONCRETE AT THE BATCH PLANT.
25.OWNER/ CONTRACTOR TO CALL CUPERTINO SANITATION DISTRICT AT LEAST 48 HOURS TO SCHEDULE DISTRICT INSPECTION. DISTRICT TO
PROVIDE BUILDING DEPARTMENT WITH WRITTEN NOTIFICATION UPON COMPLETION OF INSPECTION.
26.INSTALL AN APPROVED BACKFLOW DEVICE (IAPMO OR UPC APPROVED) ONE FOOT ABOVE THE RIM OF THE NEAREST UPSTREAM
MANHOLE. THE BACKFLOW DEVICE WILL BE INSPECTED TO VERIFY EXISTENCE AND SERVICEABILITY BY A DISTRICT INSPECTOR AT THE
TIME OF VIDEO INSPECTION. DISTRICT TO PROVIDE BUILDING DEPARTMENT WITH WRITTEN NOTIFICATION UPON COMPLETION OF
INSPECTION.
EROSION CONTROL NOTES:
1.ALL CONSTRUCTION ACTIVITIES SHALL BE PERFORMED IN CONFORMANCE WITH THE STORM WATER POLLUTION PREVENTION PLAN FOR
THIS PROJECT AND AS REQUIRED BY THE STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD R2-2003-0021 AND NPDES PERMIT
NO. CAS 0029831.
2.THE DEVELOPER IS RESPONSIBLE FOR ENSURING THAT ALL CONTRACTORS AND SUB-CONTRACTORS ARE AWARE OF ALL STORM WATER
QUALITY MEASURES AND IMPLEMENT SUCH MEASURES. FAILURE TO COMPLY WITH THE APPROVED CONSTRUCTION BEST MANAGEMENT
PRACTICES WILL RESULT IN THE ISSUANCE CORRECTION NOTICES, CITATIONS, AND/ OR STOP ORDERS.
3.ANY VEHICLE OR EQUIPMENT WASHING/ STEAM CLEANING MUST BE DONE AT AN APPROPRIATELY EQUIPPED FACILITY WHICH DRAINS TO
THE SANITARY SEWER. OUTDOOR WASHING MUST BE MANAGED IN SUCH A WAY THAT THERE IS NO DISCHARGE OF SOAPS, SOLVENTS,
CLEANING AGENTS OR OTHER POLLUTANTS TO THE STORM DRAINS. WASH WATER SHALL DISCHARGE TO THE SANITARY SEWER, SUBJECT
TO REVIEW AND APPROVAL OF UNION SANITARY DISTRICT.
4.THE CONTRACTOR SHALL BE RESPONSIBLE FOR LITTER CONTROL AND SWEEPING OF ALL PAVED SURFACES DURING CONSTRUCTION.
5.THE FACILITIES SHOWN ON THIS PLAN ARE DESIGNED TO CONTROL EROSION AND SEDIMENT DURING THE RAINY SEASON, OCTOBER 1 TO
APRIL 15. EROSION CONTROL MEASURES ARE TO BE FUNCTIONAL PRIOR TO OCTOBER 1ST OF ANY YEAR GRADING OPERATIONS HAVE
LEFT AREAS UNPROTECTED FROM EROSION.
6.ALL ON-SITE STORM DRAINS SHALL BE CLEANED IMMEDIATELY BEFORE THE START OF THE RAINY SEASON BEGINNING ON OCTOBER 1ST
EACH YEAR, SUBJECT TO THE REVIEW OF THE BUILDING/ ENGINEERING INSPECTOR.
7.IF RAINY WEATHER BECOMES IMMINENT, GRADING OPERATIONS SHALL BE STOPPED AND EROSION CONTROL MEASURES SHALL BE
IMPLEMENTED TO PROTECT DISTURBED AREAS.
8.DURING THE RAINY SEASON, ALL PAVED AREAS SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. THE SITE SHALL BE MAINTAINED
SO AS TO MINIMIZE SEDIMENT LADEN RUNOFF TO ANY STORM DRAIN SYSTEM.
9.CONSTRUCTION ENTRANCES SHALL CONSIST OF A MINIMUM 8" THICK LAYER OF 3"-4" FRACTURED STONE AGGREGATE UNLAID WITH
GEOTEXTILE LINER FOR A MINIMUM DISTANCE OF 50 FEET, AND IS TO BE PROVIDED AT EACH VEHICLE ACCESS POINT TO EXISTING PAVED
STREETS. THE DEPTH AND LENGTH OF AGGREGATE MAY NEED TO BE ADJUSTED IN THE FIELD TO ENSURE NO TRACKING OF SEDIMENT
ONTO EXISTING PAVED STREETS. CONSTRUCTION ENTRANCES SHALL SLOPE AWAY FROM EXISTING PAVED STREETS.
10.INLETS NOT USED IN CONJUNCTION WITH EROSION CONTROL MEASURES ARE TO BE BLOCKED UNLESS THE AREA DRAINED IS
UNDISTURBED OR STABILIZED.
11.BORROW AREAS AND TEMPORARY STOCKPILES SHALL BE PROTECTED WITH APPROPRIATE EROSION CONTROL MEASURES TO THE
SATISFACTION OF THE CITY ENGINEER.
12.NO STRAW BALES OR SILT FENCES SHALL BE USED AS EROSION CONTROL MEASURES. SILT FENCES MAY ONLY BE USED AS A PHYSICAL
BARRIER TO PREVENT VEHICULAR AND PEDESTRIAN TRAFFIC FROM USING NON-APPROVED ACCESS POINTS (E.G.-ALONG
RIGHT-OF-WAY).
13.ALL DISTURBED AREAS INCLUDING FLAT PADS ARE TO BE TREATED WITH STRAW AND TACKIFIER AT A RATE OF 2 TONS PER ACRE
APPROXIMATELY 3 INCHES THICK, APPROVED EQUAL.
MALALEUCA LINARIFOLIA5
24" BOX
GINKGO2
24" BOX
PROPOSED LAWN
NANDINA DOMESTICA 'COMPACTA'
HEAVENLY BAMBOO
2
5 GAL
JUNCUS PATERNS 'CARMAN'S GRAY'
GRAY CALIFORNIA RUSH
7
1 GAL
7
1 GAL
JUNCUS PATERNS 'CARMAN'S GRAY'
GRAY CALIFORNIA RUSH
ABELLA EDWARD GOUCHER
EDWARD GOUCHER ABELLA
8
5 GAL
ABELLA EDWARD GOUCHER
EDWARD GOUCHER ABELLA
3
5 GAL
AZALEA 'BRILLIANT'
BRIGHT PINK SUN AZALEA
6
5 GAL
VIBURNUM DAVIDIL
DAVIDIL VIBURNUM
7
5 GAL
NANDINA DOMESTICA 'COMPACTA'
HEAVENLY BAMBOO
1
5 GAL
NANDINA 'FIREPOWER'
DWARF HEAVENLY BAMBOO
6
1 GAL
/
,
1
(
2
)
6
,
*
+
7
/
,
1
(
2
)
6
,
*
+
7
2nd Floor
Window
Location
2nd Floor
Window
Location
/
,
1
(
2
)
6
,
*
+
7
/
,
1
(
OF
S
I
G
H
T
2nd Story
2n
d
S
t
o
r
y
2n
d
S
t
o
r
y
2n
d
S
t
o
r
y
2nd Story
2nd Story
2nd Story
VINCA AREAS 12" O.C.
DROUGHT RESISTANT FESCUE TURF SOD
GAZANIA AREAS 12" O.C.
PROPOSED 5 GALLON CONTAINER SHRUB
PROPOSED 5-GALLON CONTAINER SHRUB
VINCA MINOR - DWARF PERIWINKLE
GROUND COVERS:
GAZANIA UNIFLORA (WHITE) - AFRICAN DAISY
ABELLA EDWARD GOUCHER
GINKO
AS REQUIRED
3
11
2
TREES:
SHRUBS:
5GC
5GC
24" BOX
NANDINA DOMESTICA 'COMPACTA'
JUNCUS PATERNS 'CARMAN'S GRAY'
AS REQUIRED
AZALEA 'BRILLIANT'
VIBURNUM DAVIDIL
14
6
7
NANDINA 'FIREPOWER'6
1GC
5GC
5GC
1GC
MALALEUCA LINARIFOLIA5 24" BOX
GENERAL NOTES:
1.THE PROPERTY OWNER SHALL RECORD A COVENANT ON THE PROPERTY FOR THE NEW TREES/ SHRUBS PLANTED FOR PURPOSE OF
PRIVACY PROTECTION AND REQUIRED FRONT YARD TREE.
2.FOLLOWING COMPLETION OF CONSTRUCTION, AN AFFIDAVIT FROM AN ISA-CERTIFIED ARBORIST SHALL BE PROVIDED CONFORMING
THAT THE NEW TREES HAVE BEEN PLANTED PROPERLY AND ACCORDING TO PLAN.
3.A PLANNING DIVISION INSPECTION IS REQUIRED TO VERIFY EXTERIOR MATERIALS/ FINISHES, TREES, LANDSCAPING AND SITE WORK.