HomeMy WebLinkAbout03-12-2015 City of Cupertino
10300 Torre Avenue, Cupertino, California 95014 (408) 777-3308
ADMINISTRATIVE HEARING AGENDA
Conference Room C
Thursday, March 12, 2015, 5:00 p.m.
ORDER OF BUSINESS:
ROLL CALL
APPROVAL OF MINUTES
November 13, 2014
WRITTEN COMMUNICATIONS
None
ORAL COMMUNICATIONS
(Reserved for persons wishing to address the Hearing Officer on issues that are not already
included on the regular Order of Business)
ITEMS:
1. Application No.(s): ASA-2014-15
Applicant: Lisa Tse (Fan residence)
Location: 10860 Maxine Avenue
Architectural and Site approval to allow modifications and a 780 square foot addition to
a residential duplex
Administrative Hearing decision is final unless appealed
ACTION TO BE TAKEN:
Approve or deny ASA-2014-15
ADJOURNMENT
If you challenge the action of the Hearing Officer at the Administrative Hearing in court, you
may be limited to raising only those issues you or someone else raised at the public meeting
described in this notice, or in written correspondence delivered to the City of Cupertino at, or
prior to, the meeting. Please note that the policy for oral communication is to allow an applicant
and groups to speak for 10 minutes and individuals to speak for 3 minutes. In the event an
action taken by the Hearing Officer is deemed objectionable, the matter may be officially
appealed to the Planning Commission in writing within fourteen (14) days of the date of the
Hearing Officer's decision. Said appeal is filed with the City Clerk (Ordinance 632).
Members of the public are entitled to address the Hearing Officer concerning any item that is
described in the notice or agenda for this meeting, before or during consideration of that item. If
you wish to address the Hearing Office on any other item not on the agenda, you may do so
Page 3 Administrative Hearing Committee March 12,2015
during the public comment portion of the meeting. Please limit your comments to three (3)
minutes or less.
In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to
attend the next Administrative Hearing meeting who is visually or hearing impaired or has any
disability that needs special assistance should call the City Clerk's Office at 408-777-3223, 48
hours in advance of the meeting to arrange for assistance. Upon request, in advance, by a
person with a disability, Administrative Hearing meeting agendas and writings distributed for
the meeting that are public records will be made available in the appropriate alternative format.
Also upon request, in advance, an assistive listening device can be made available for use
during the meeting.
Administrative Hearing
November 13,2014
Cupertino, CA 95014
(408) 777-3308
ACTION MINUTES OF THE REGULAR MEETING OF
THE ADMINISTRATIVE HEARING HELD ON November 13, 2014
ROLL CALL
Hearing Officer present: Gary Chao, Assist. Director of Community Development
Staff present: Piu Ghosh
Rebecca Tolentino
Applicant(s)present: Apple Campus II development team
APPROVAL OF MINUTES:
October 9, 2014
The minutes of October 9, 2014 were approved as written
WRITTEN COMMUNICATIONS:
None
POSTPONEMENTS/REMOVAL FROM CALENDAR:
None
ORAL COMMUNICATION:
None
PUBLIC HEARING:
1. Application No.(s): ASA-2014-08,TR-2014-59 (EA-2011-12)
Applicant: Wolfgang Wagener(Apple Campus 2)
Location: properties located east and west of N Tantau bounded by Calabasas
Creek to the north and west, City of Santa Clara limits to the east and
I-280 to the south
Architectural and Site approval to review office, research and development facilities in three
buildings, associated parking structure, restaurant and site ixnprovements for Phase 2 of a
previously approved office, research and development campus;
Tree Removal Perxnit to refine a previously approved Master Tree Removal Permit (TR-2011-
39) for an office, research and development campus
Administrative Hearing decision final unless appealed.
Staff Member Ghosh reported that the applications are to define the architectural details for Phase 2A
(5 buildings on sites C & D) of the new Apple Campus 2 project. The project was approved by the
2 Administrative Hearing
November 13,2014
City Council in 2013 and Phase 1 is currently under construction. The proposed design of the 5
buildings on sites C & D is consistent with the prior approvals. The proposed square footage in these
sites has been slightly reduced from what was originally approved. The building heights are at or
below the approved limit. The proposed setbacks, parking and bicycle spaces are within the original
prescribed amounts, including the setbacks along Calabasas Creek. There will be less grading than
originally proposed as some of the parking will now be in a structure rather than all underground as
originally proposed. The applicant is requesting to remove additional trees. These trees are in poor
health or are within the building envelope of the project sites. However, even with the increased
number of removed trees, the overall trees to be removed is still within the prior approved limit. The
applicant will be retaining and transplanting some of the trees that were originally marked for
removal. The proposed architectural design complements the design of the new campus building
with glass facades, metal awnings and energy efficient components. Three of the buildings will be
very similar in appearance. All of the rooftop mechanical systems will be screened from view. The
sites can only be accessed by one continued intersection which will provide good traffic flow off of
Tantau Avenue. A condition has been added to allow Staff to review and approve the lighting plan to
ensure there is no light spillage or light pollution onto the adjacent neighbors. The site is required to
have water efficient landscaping. A portion of the existing fence will be being replaced at the shared
property line and a sound wall will be added along the freeway. A condition has been added to have
the new sound walls screened to 'soften' their appearance along the freeway. The environmental
consultant reviewed the proposed design and prepared an addendum to the original EIR stating that
there are no new concems or impacts. Staff has received one comment regarding the proposed height
of one of the new testing facility buildings (from an existing single to a two story), a comment
regarding noticing of the project and a comment relating to the overall operation of the campus
(noise, light, traffic, hazardous materials, privacy, etc.). Staff inember Ghosh stated that these items
had been addressed in the original approval process and that the applicant's proposals adhere to the
requirements of the prior approval. The City has also met its obligations according to the Municipal
Code and Ordinances. The Environmental Impact Repart outlines mitigations designed to reduce the
impacts of the campus operations to the surrounding areas.
The Hearing Officer asked for clarification about the reduced square footage; the restaurant and
satellite plant buildings have been reduced in size. The Hearing Officer asked Staff Member Ghosh to
explain more about the light plan requirement. She explained that prior to the issuance of the
building permit, the applicant is required to submit photometric plans drawn up by certified electrical
engineers. These plans will show what the light levels are at different distances from the various light
sources. At the property line, the light level should be at zero. There should be no light spillage onto
the neighboring properties. The Hearing Officer asked about the procedures when an applicant asks
to remove additional trees. Staff Member Ghosh stated that a certified arborist needs to do an audit on
the trees to confirm that the request for removal is valid. The audit revealed that the additional trees
are in poor health and would not survive the construction or transplanting process. She emphasized
that there are no trees between the creek and the residences slated for removal. And that the same
number of trees being replanted on the site is in accordance with the Protected Tree Ordinance. The
Hearing Officer clarified for the public in attendance that the purview of this meeting was to outline
the architectural style of the buildings and landscaping plans for sites C and D. The overall scope and
scale of the project has already been approved by the City Council. The Hearing Officer asked about
the proposed design change to the parking structure. Staff Member Ghosh said that the main parking
structure, which is adjacent to the Hamptons Apartment complex, has architectural features that will
screen the glare from the headlights of the cars in that parking structure onto the complex. She is
suggesting that this parking structure have the same sort of features along the north east corner.
3 Administrative Hearing
November 13,2014
The applicant's agent, Dan Whisman, addressed the Hearing Officer. He spoke about the timeline for
the other construction projects taking place on the site. The demolition of the existing structures for
Phase 2B (areas north of Pruneridge) should start in summer 2015 with new construction progressing
after that and into 2016. Construction in the areas south of Pruneridge and north of Calabasas Creek
will start later in 2016. He stated that they would be willing to reduce the light levels in the parking
garage according to employee usage and daylight hours. Apple employees have flexible schedules,
but generally the buildings would be occupied from 9am to 6pm.
The Hearing Officer opened the public hearing session:
Jennifer Griffin, Cupertino resident; asked about the potential removal of one row of Ash trees near
the crossing of Stevens Creek and Tantau and about what road improvements will be done around
the development site.
Richard Wentz, Santa Clara resident; asked about the old concrete wall. He wanted to know if it
would be extended. He also asked for clarification about the tree removals. He wanted to make sure
that the existing setbacks between Apple and the abutting residential homes would be the same. He
also wanted to make sure that contact information would be provided to the neighbors so concerns,
questions or complaints could be addressed promptly by someone at Apple.
The concrete wall will be extended; the Redwood trees will not be removed; the setbacks will be the same;
contact information will be provided
Carol Cherry, Santa Clara resident; she stated that she has been having trouble reaching anyone at
Apple. She is concerned about noise as her bedroom is along the construction site. She complained
that construction is sometimes starting at 4:30 am.
Contact information will be provided
Janice Wentz, Santa Clara resident; wanted to know why the parking garage is going to be located
next to a park where children play. The children would be exposed to exhaust fumes.
The garage is 'open air'so the fumes will dissipate; the placement of the parking structure is by design
to have it as far away from the residences as possible
(unknown) Mary, San Jose resident; said she thought that all the parking was to be underground. She
also was concerned that the employee shuttle routes would be through neighborhoods.
There is underground parking for Phase 1 part of the project; the shuttle routes have been designed so
that the buses will not run through neighborhoods
Tamara Rodriguez, San Jose resident; stated her concerns about privacy with all the big glass
windows and the light spillover onto her property, especially at night. She also wanted to have a
number to call to report bad shuttle bus drivers.
Rob Wagner, Santa Clara resident; he feels the buildings are too tall and expressed privacy concerns
similar to the prior speaker. He also says he has a problem with Apple's employees who smoke. They
all congregate near the building close to his house at the south end of the creek. He is hoping that the
replanted trees will be shorter than Redwoods so to have low canopies.
Patrick Robbins, Santa Clara resident; shared privacy concerns from all of the large glass windows
proposed along his property line. He said the site elevations of the plan set didn't appear to be very
factual in depiction of the sight line measurements of the residential fence line to the proposed
windows.
The public hearing session was closed.
The Hearing Officer thanked the members of the public for their input and encouraged them to talk to
the Apple Representative or to the City's Staff to help get issues or concerns addressed promptly. Dan
Whisman said he would instruct his Staff to be better neighbors and to do what he could to get a
better response when calls come in about the new construction and ongoing operations.
The Hearing Officer reminded the speakers that some of the issues brought up today are outside the
scope of the authority of this meeting. Setbacks,building envelopes and building heights had already
4 Administrative Hearing
November 13,2014
been approved by the City Council. He would be able to address concerns regarding light spillage.
The office buildings will have occupancy sensors on all the lighting so that if a space doesn't have any
activity for some length of time, the lights in that space will go off. The discussion continued
regarding the possibility of installing opaque glass or opaque window treatments on higher floors
rather than just on the first floor to help with the privacy concems. Staff and the applicant will explore
options to mitigate the privacy concerns of the neighbors pertaining to window treatments. The
applicant did state that all the homes are all single story so the proposed designs with the trees and
high wall did take their privacy concerns into consideration. Just as the residents don't want Apple
staff to be able to look into their homes, Apple doesn't want the residents to be able to look into their
office buildings. The hearing officer said that a Condition of Approval will be added to include
privacy treatments for the glass and that these privacy treatments will need to be maintained. The
Hearing Officer spoke regarding the existing perimeter Redwood trees. The original approval calls for
those trees to remain in place. He said he would be willing to talk to the applicant about enhancing
the landscape plan where there may be gaps. Staff inember Ghosh wanted to make a note that the
language in the Staff Report of one the findings of the project will be slightly re-written for better
clarity.
DECISION: The applications were approved by the Hearing Officer per the draft resolutions with the
following modifications:
Modify the existing condition regarding light screening for the light concerns on the parking garage
near the north east corner that sits on a angle facing the residences to include wording such that prior
to the issuance of the building permit, the applicant shall work out a screening solution with Staff.
Screening options shall include,but not limited to a timed or sensory device or a physical barrier;
Add a condition to require the applicant to work with Staff prior to the issuance of the building
permit to establish a strategy to mitigate privacy issues for the second story glass panes along the east
and northeast sections of the buildings facing the neighboring residences. Such mitigations shall
include,but not limited to, opaque glass or other window treatments starting at the 5 foot level;
Make minor revisions to conditions for better clarity.
ADJOURNMENT
Respectfully submitted:
/sBeth Ebben
Beth Ebben
Administrative Clerk
g:planning/AH Committee/Minutes111314
OFFICE OF COMMUNITY DEVELOPMENT
CITY HALL
10300 TORRE AVENUE •CUPERTINO,CA 95014-3255
C U P E RT I N O (408)777-3308 • FAX(408)777-3333 • planninQCu�cuqertino.orQ
ADMINISTRATIVE HEARING STAFF REPORT
Agenda Item No. _� Agenda Date: March 12, 2015
Application: ASA-2014-15
Applicant: Lisa Tse (Fan Property)
Project Location: 10860 Maxine Avenue (APN 326-02-063)
Application Summary:
Architectural and Site Approval (ASA-2014-15) for a 780 square foot net addition to an existing
single story duplex located in an R2-4.25i zoning district.
RECOMMENDATION:
Staff recommends that the Hearing Officer:
Approve the Architectural and Site Approval (ASA-2014-15) per the draft resolution.
PROJECT DATA:
General Plan Low/Medium Density (5-10 DU/Gross Acre)
Designation
Zoning Designation R2-4.25i (Residential Duplex District,
8,500 square feet minimum lot size single story overlay)
Existing/Proposed Use: Residential duplex
Lot Size 27,300 square feet(0.63 acres)
Allowed/Required Existing Proposed
Lot coverage 40°/o (10,920 s.f.) 14.2% (3,877 s.f.) 17.4% (4,763 s.f.)
Height One story, not 16'1/4" 16'1/4" (no change)
exceeding 18'
First floor building Front- 20' Front—20' Front-20' (no change)
setbacks Side(combined) - 75'; Side(combined) -269'; Side(combined)—249';
6' min. 35' 35' min.
Rear-20' Rear—20' Rear-20' (no change)
Project Consistency with:
General Plan Yes
Zoning Yes
Environmental Review Categorically Exempt per Section 15301, Class 1 (Existing Facilities—
Additions to Existing Structures) of California Quality Act(CEQA)
ASA-2014-15 Addition to Existing Duplex March 12,2015
Page 2
BACKGROUND:
��F;t,R a,s�. .#..dr� ,^.., r �! =_' '��
The subject property is located on the east "��`��� ��� � �
" � - -.�._: _
. r. ..�.- -
side of Maxine Avenue between - _
� ��: � �� r _ — — —
. � _ � A �
��.�.' '� s . t �; ,'� _- „
x �„„�,,,.�.
Homestead Road and Caroline Drive, and °;,� �� �� °�� �, � � ��� :� �
currently consists of a duplex residence. ��-�� ��F� �` _ ' ��°� , �i� �'
�, � ` y`- � � �
� , � . �
To the north and east of the property is � �--'� ;�° � �'�����`�`' �_, � ��.,:�: :> �
Hi hwa 85. To the west of the ro ert ---.'��`�`�'�' �� - - � ��� � �
g Y P P Y .� ���.,�,_� �. � x�
across the street are sin le famil � " � � � � �
� � g y � °� �.�., ,� � � t � � �: w� ..�
'�� ,i""-,.�,,...�� '�.. � ���"'
residences, and other duplexes are �x.�' r�. W ���. ; g; ,,;_ * ��. �� 4 `< 'k t�.'`�, . ,;��
located to the south. � � �`�'�°� - �-� � �'•�'� � � � ��
� ' �
��,.+-�� {4���� �n.� '� ��j�j�R�� S � tt..t* 6 s{.
� � `�.� �
f� � S
DISCUSSION: � ,� � ' .� ��: }�� ' � �
� �_ �` - �;,�, � . ,� � � � ��
,A�
`w�� e ��� ��4��+F+. 6 a9% �, * � `v"�
The applicant, Lisa Tse, representing the �� �� =,�� ��-��-� ,� �� �� y ����
property owner Ernest Fan, is proposing a �` ' A' x� ��'�� " .�� � ���' �� ° ��
780 square foot addition to create a new ,.� � � � �� ' �.`"`'""''"�� fI� ,�,�� :, �*r �
`p� ,� ` r�� a�',+�",; ,}� �� •
two-car garage, add two bedrooms, and .�•.���, �d.. �� ��' � � �,
� . +.._.i . �.'� = � z :"'�� < , �
expand the kitchen and dining room area �� `�`" �� �•"�.,� � ^ `
�.,, �� � . . ! �i-d���,�� �.��
z_rt. „
of one of the units of the existing duplex. �F>; �"� -� : .. � � �'�
:,.''G��n�.� �"" �`�--�
Site Vicinity Aerial
The addition is harmonious with existing architecture, colors, ana materiais or tne duplex.
According to the R-2 ordinance, all additions in the R-2 zoning district require Architectural and
Site Approval at an Administrative Hearing, in order to assure a high degree of architectural
quality and to address other development issues. The project is consistent with the General Plan
and the R-2 Ordinance (lot coverage, setbacks, building height). The design of the addition is
compatible with the existing structure and the exterior materials for the addition match existing
materials.
In order to accommodate the addition a twenty-four (24) inch Diameter DBH Ash tree has to be
removed. Per Cupertino Municipal Code Section 14.18.050 Protected trees, the Ash tree is not
considered to be a protected tree and therefore, neither a Tree Removal Permit nor replacement
trees are rec�uired.
OUTREACH/NOTICING
The following table is a brief summary of the noticing done for this project:
Notice of Public Meetin &Site Si na e A enda
■ Posted on the site (10 da�s prior to hearing) ■ Posted on the City's official notice bulletin
■ 8 notices mailed to property owners board (one week prior to hearing)
adjacent to the project site (10 days prior to ■ Posted on the City of Cupertino's Web site
hearin ) (one week to hearin )
PERMIT STREAMLINING ACT
ASA-2014-15 Addition to Existing Duplex March 12,2015
Page 3
This matter is adjudicatory and is subject to the Permit Streamlining Act (Government Code
Section 65920 — 65964). The City has complied with the deadlines found in the Permit
Streamlining Act.
Project Received: December 22, 2014
Deemed Complete:January 22, 2015
Since this project is Categorically Exempt, the City has 60 days (until March 23, 2015) to make a
decision on the project. The Hearing Officer's decision on this project is final unless appealed
within 14 calendar days of the decision.
CONCLUSION
Staff recommends approval of the Architectural and Site Approval, since the plans and
conditions of approval address all concerns related to the proposed project. Additionally, all of
the findings for approval of the proposed project, consistent with Chapter 19.168 of the
Cupertino Municipal Code, may be made as reflected in the Draft Resolution.
Submitted by: Erick Serrano, Assistant Planner
Reviewed by: Piu Ghosh, Senior Planner
Attachments
Draft Resolution
Plan Set
ASA-2015-04
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
DRAFT RESOLUTION
OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO FOR
AN ARCHITECTURAL AND SITE APPROVAL OF A 780 SQUARE FOOT ADDITION
TO AN EXISTING SINGLE STORY DUPLEX LOCATED AT 10860 MAXINE AVENUE
SECTION I: PROTECT DESCRIPTION
Applicant: Lisa Tse
Property Owner: Ernest and Hoiman Fan
Location: 10860 Maxine Avenue (APN #362-02-063)
SECTION II: FINDINGS
WHEREAS, the Administrative Hearing Officer of the City of Cupertino received an application
to allow an Architectural and Site Approval of a 780 square foot addition to an existing single
story duplex located in an R2-4.25i zoning district;
WHEREAS, the necessary public notices have been given as required by the Procedural
Ordinance of the City of Cupertino, and the Planning Commission has held at least one public
hearing in regard to the application;and
WHEREAS,the applicant has met the burden of proof required to support said application; and
WHEREAS, the Administrative Hearing Officer finds:
1. The proposal, at the proposed location, will not be detrimental or injurious to property or
improvements in the vicinity, and will not be detrimental to the public health, safety,
general welfare, or convenience;
The applicant is proposing to add 780 square feet to one of the units of an existing duplex in order to
add a two-car garage and two bedrooms. The applicant is also proposing to remodel the interior. Since
the proposed addition and remodel is located on private property and does not conflict with any public
easements etc., tlie project is not detrimental to tlie public health, safety, general welfare or
convenience.
2. The proposal is consistent with the purposes of Chapter 19.168, Architectural and Site
Review, of the Cupertino Municipal Code, the General Plan, any specific plan, zoning
ordinances, applicable planned development permit, conditional use permits, variances,
Draft Resolution ASA-2014-15 March 12,2015
Page 2
subdivision maps or other entitlements to use which regulate the subject property
including,but not limited to, adherence to the following specific criteria:
a) Abrupt changes in building scale should be avoided. A gradual transition related to
height and bulk should be achieved between new and existing buildings;
The existing building is 16'1/4" and there is no proposed increase in height. Therefore, the
proposed addition matches the scale of the existing structure.
b) In order to preserve design harmony between new and existing buildings and in order to
preserve and enhance property values, the materials, textures and colors of new
buildings should harmonize with adjacent development by being consistent or
compatible with design and color schemes, and, with the future character of the
neighborhood and purposes of the zone in which they are situated. The location, height
and materials of walls, fencing, hedges and screen planting should harmonize with
adjacent development. Unsightly storage areas, utility installations and unsightly
elements of parking lots should be concealed. The planting of ground cover or various
types of pavements should be used to prevent dust and erosion, and the unnecessary
destruction of existing healthy trees should be avoided. Lighting for development should
be adequate to meet safety requirements as specified by the engineering and building
departments, and provide shielding to prevent spill- over light to adjoining property
owners; and
The addition is proposed to have the same building materials and be painted the same as the
existing structure. The project proposes no changes to the location, height, and materials of walls
fencing, hedges and screen planting, and is to be consistent with the requirements of Cupertino
Municipal Code Chapter 19.48: Fences. Tlze applicant proposes the removal of one twenty four
(24) inch DBH Ash tree. The Ash tree is not protected per Cupertino Municipal Code Chapter
14.18: Protected Trees and neither a permit nor tree replacements are required. Exterior lighting
other than that expected in residential development is not being proposed. Therefore, tliere are no
spill-over light impacts expected from the development.
c) With respect to new projects within existing residential neighborhoods, new
development should be designed to protect residents from noise, traffic, light and
visually intrusive effects by use of buffering, setbacks, landscaping, walls and other
appropriate design measures
The proposed addition meets the required setbacks of the R-2 Zoning District. Since the addition is
a single story addition, tlie applicant is not required to plant additional sc�•eening landscape
material.
NOW, THEREFORE,BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted
in this matter, subject to the conditions which are enumerated in Section III and IV of this
Draft Resolution ASA-201415 March 12,2015
Page 3
Resolution beguuling on Page 3 thereof, the Application No. ASA-2014-15 is hereby approved;
and that the sub-conclusions upon which the findings and conditions specified in this Resolution
are based and contained in the public hearing record concerning Application ASA-2014-15 as set
forth in the Minutes of the Administrative Hearing Meeting of March 12�, 2015, and are
incorporated by reference as though fully set forth herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT
DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the plan set entitled, "Residential Addition, 10860 Maxine Ave,
Cupertino, California" dated January 26, 2015 drawn by Lisa W. Tse of Integrand Structural
Engineering & Design, consisting of twelve (12) sheets labeled A1.01 through A3.05, except
as may be amended by conditions in this resolution.
2. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data including
but not limited to property boundary locations, building setbacks, property size, building
square footage, any relevant easements and/or construction records. Any misrepresentation
of any property data may invalidate this approval and may require additional review.
3. FENCES
All fencing shall comply with Cupertino Municipal Code Chapter 19.48: Fences. Any
changes to the fencing shall require design review with the Community Development
Department.
4. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with regard
to the proposed project for additional conditions and requirements. Any misrepresentation
of any submitted data may invalidate an approval by the Community Development
Departxnent.
5. EXTERIOR BUILDING MATERIALS/TREATMENTS
Final building exterior treatment plan (including but not limited to details on exterior color,
material, architectural treatments and/or embellishments) shall be reviewed and approved
by the Director of Community Development prior to issuance of building permits. The final
building exterior plan shall closely resemble the details shown on the original approved
plans. Any exterior changes determined to be substantial by the Director of Comtnunity
Development shall require a modification approval with neighborhood input.
6. �NDEMNIFICATION
To the extent permitted by law, the applicant shall indemnify and hold harmless the City, its
City Council, its officers, employees and agents (the "indemnified parties") from and
against any claim, action, or proceeding brought by a third party against the indemnified
parties and the applicant to attack, set aside, or void this Resolution or any permit or
Draft Resolution ASA-2014-15 March 12,2015
Page 4
approval authorized hereby for the project, including (without limitation) reimbursing the
City its actual attorneys' fees and costs incurred in defense of the litigation. The applicant
and City shall use best efforts to select mutually agreeable legal counsel to defend such
action, and the applicant shall pay all compensation for such legal counsel, following the
applicant's receipt of invoices from City, together with reasonable supporting
documentation. Such compensation shall include reasonable compensation paid to counsel
not otherwise employed as City staff and shall include City Attorney time and overhead
costs and other City staff overhead costs and any costs directly related to the litigation
reasonably incurred by City. If the applicant and the City cannot in good faith agree on joint
counsel, the City shall have the right to retain counsel of its own choosing, separate from the
applicant's litigation counsel.
7. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees, dedication
requirements, reservation requirements, and other exactions. Pursuant to Government
Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the
amount of such fees, and a description of the dedications, reservations, and other exactions.
You are hereby further notified that the 90-day approval period in which you may protest
these fees, dedications, reservations, and other exactions, pursuant to Government Code
Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying
with all of the requirements of Section 66020, you will be legally barred from later
challenging such exactions.
SECTION IV: CONDITIONS ADMINSTERED BY THE PUBLIC WORKS DEPARTMENT
1. STREET IMPROVEMENTS
Both driveway approaches, existing and proposed, shall be constructed to meet ADA
standards (per City Standard Detail 1-21). Close unused driveway approach and replace
with curb, gutter and sidewalk in accordance with grades and standards as specified by the
City Engineer.
2. PEDESTRIAN AND BICYCLE IMPROVEMENTS
Developer shall provide pedestrian and bicycle related improvements consistent with the
Cupertino Bicycle Transportation Plan and the Pedestrian Transportation Guidelines, and as
approved by the City Engineer.
3. GRADING
Grading shall be as approved and required by the City Engineer in accordance with Chapter
16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits maybe required.
Please contact Army Corp of Engineers and/or Regional Water Quality Control Board as
appropriate.
4. DRAINAGE
Drainage shall be provided to the satisfaction of the City Engineer. Hydrology and pre- and
post-development hydraulic calculations must be provided to indicate whether additional
Draft Resolution ASA-2014-15 March 12,2015
Page 5
storm water control measures are to be constructed or renovated. The storm drain system
may include, but is not limited to, subsurface storage of peak stormwater flows (as needed),
bioretention basins, vegetated swales, and hydrodynamic separators to reduce the amount
of runoff from the site and improve water quality. The storm drain system shall be designed
to detain water on-site (e.g., via buried pipes, retention systems or other approved systems
and improvements) as necessary to avoid an increase of the ten percent flood water surface
elevation to the satisfaction of the City Engineer. Any storm water overflows or surface
sheeting should be directed away from neighboring private properties and to the public
right of way as much as reasonably possible.
5. ENCROACHMENT PERMIT
The project developer shall obtain an encroachment permit with the City of Cupertino
providing for payment of fees, including but not limited to checking and inspection fees,
storm drain fees,park dedication fees and fees for under grounding of utilities.
Fees:
a. Checking&Inspection Fees: $655
b. Storm Drainage Fee: $TBD
c. Encroachment Permit $263
d. Street Trees (Two) $696
e. Bonds $TBD
6. The fees described above are imposed based upon the current fee schedule adopted by the
City Council. However, the fees imposed herein may be modified at the time of recordation
of a final map or issuance of a building permit in the event of said change or changes, the
fees changed at that time will reflect the then current fee schedule.
7. BEST MANAGEMENT PRACTICES
Utilize Best Management Practices (BMPs), as required by the State Water Resources
Control Board, for construction activity, which disturbs soil. SMI'plans shall be included in
grading and street improvement plans.
8. C.3 REQUIREMENTS
C.3 regulated improvements are required for all projects creating and/or replacing 10,000
S.F. or more of impervious surface (collectively over the entire project site). The developer
shall reserve a minimum of 4% of developable surface area for the placement of low impact
development measures, for storm water treatment, on the tentative map, unless an
alternative storm water treatment plan, that satisfies C.3 requirements, is approved by the
City Engineer.
9. EROSION CONTROL PLAN
Developer shall provide an approved erosion control plan by a Registered Civil Engineer.
This plan should include all erosion control measures used to retain materials on site.
Erosion control notes shall be stated on the plans.
Draft Resolution ASA-2014-15 March 12,2015
Page 6
10. WORK SCHEDULE
Every 6 months, the developer shall submit a work schedule to the City to show the
timetable for all grading/erosion control work in conjunction with this project.
11. STREET TREES
Street trees shall be planted by the City within the Public Right of Way and shall be of a type
approved by the City in accordance with Ordinance No. 125.
12. SANTA CLARA COUNTY FIRE DEPARTMENT
A letter of clearance for the project shall be obtained from the Santa Clara County Fire
Department prior to issuance of building permits. Clearance should include written
approval of the location of any proposed Fire Backflow Preventers, Fire Department
Connections and Fire Hydrants (typically Backflow Preventers should be located on private
property adjacent to the public right of way, and fire department connections must be
located within 100' of a Fire Hydrant).
13. DEDICATION OF UNDERGROUND WATER RIGHTS
Developer shall "quit claim" to the City all rights to pump, take or otherwise extract water
from the underground basin or any underground strata in the Santa Clara Valley.
14. SANITARY DISTRICT
A letter of clearance for the project shall be obtained from the Cupertino Sanitary District
prior to issuance of building permits.
PASSED AND ADOPTED this 12� day of March, 2015 at a Regular Meeting of the
Administrative Hearing Meeting of the City of Cupertino, State of California, by the following
roll call vote:
AYES:
NOES:
ABSENT:
ATTEST: APPROVED:
Erick Serrano Gary Chao
Assistant Planner Asst. Director of Community Development
SITE PLAN
SCALE: I/I 6"= I'-O"
PROJECT STATISTICS
ON'NER: ERNEST AND FiOIMAN FAN
I0860 MAXINE AVE.,
CUPERTINO.CA 95014
(408)470-8274
PROJECT ADDRE55: I 0860 MAXINE AVE.,
CUPERTINO.CA 950I 4
STRUCTURAL ENGINEER: LISA TSE,INTEGRAND,INC
250 CIARATERRACE
FREMONT,CA 94539
(510)299-7520
ASSESSOF.'S PARCEL NU'�/�BER: 326-02-063
YEAR BUILT: I 974
ZONING: R2i
OCCUPANGY GROUP: R-3!U(GARAGE)
T`rPE OF CONSTRUC710N: VB
NET LOT AREA: 27,300 S.F.
EXISTING Ct1ANG� TOTAL PROPOSED
hIABITABLE LIVING ARPA: 2,21 5 S.F. +I,009 S.F, 3,224 S.F.
NON-r1ABITABLE AREA: I.1 77 S.F. -229 S.f. 948 S.F.
TOTAL AR.EA: 3.392 S.F. +780 S.F. 4.1 72 S.F.
EXI571NG PROPOSED ALLON�ED/REQUIRED
LOT COVERAGE: I 4.2�, 17.4 I� 40'b
FRONT 20' 20' 2d
�
QREAR 20' 2d 20'
m RIGNT SIDE 2d 20' 2d
N
LEFT SIDE 214' 214' 2d
Y1EIGhT: 1 6'� 1 6'2 I S'
APPLICABLE CODES
ALL CONSTRUCTION SttALL EXCEED TF1E LATEST EDITiUN OF CODES ADOPTED 8Y ThiE CITY
OF CUPER7INU TFIESE St1All INCLUDE:
CAUFORNIA BUILDING CODE 2013 EDITiON
CALIFORNIA ELECTRICAL CODE 2013 EDITION
CALIFORNIA MEChiANIGAL CODE 2013 EDITION
CAIIFORNIA PLUMBING CODE 2013 EDITION
CALIFORNIA FIRE CUDE 2013 Di ION
CALIFORNIA ENERGY CODE 2013 EDITION
CALIFORNIA GREEN BUILDING CODE 201 3 EDITION
CAL'FORNIA RESIDENTIAL CODE 201 3 EDITION
ALONG WITt1 ANY OTFIER APPUCABLE LCJCAL AND STATE LAWS AND P,EGULATIONS,
CUPERTINO CITY ORDINANCE AND STANDARDS
SEE ENLARGED SITE PLAN _
�
I
2�3'_r7
� _
�}''
� I
SCOPE OF WORK
-349 SOUARE-FOOT,SINGLE-STORY ADDITIONAL AT Tt1E FRONT OF
TFtE EXISTING DUPLEX
-CONVER510N OF EXISTING 2-CAR GARAGE s FRONT COVERED PORCti
INTO NABITABLE SPACE
-NEW 43I SQUARE-FOOT 2-CAR ATTACt1ED GARAGE
-INTERIOR RfMUDEI UF K1TCIIEN t LIVING ROOM
DEFERRED SUBMITTAL
CUNTRACTOR TO SUBMIT DEFERRED SUBMIT i AL ITEMS FOR
REVIEW AND APPROVAL BY Tt1E ARCFiITECT OR ENGiNEER OF
RECORD PRIOR TO FORWARDING TU TF1E BUILDING OFFICIAL
FOR REVIEW.TFtESE ITEMS ShALI NOT BE INSTALLED UNTIL
TrIE DESIGN AND SUBMITTAL DOCUMENTS t1AVE 6EEN
APPROVED BY TFtE CITY OF CUPERTINO:
-NUNE
DRAWING INDEX
A 1.01
A I.02
A I.03
A 2.01
A 2.02
A 2.03
A 2.04
A 3.0 I
A 3.02
A 3.03
A 3.04
A 3.05
A 4.01
5 I.I
5 1.2
5 1.3
5 2.1
S 2.2
5 3.1
5 4.1
T�.�
T 1.2
T 1.3
COVER Sh1EET
EXISTING SITE PLAN
PROPOSED SITE PLAN
EXISTING PIAN
PROPOSED FLOOR PLAN
PROPOSED RWF PLAN
REFLECTED CEILING PLAN
EXISTING EXTERIOR ELEVATIONS
EXISTING EXTERIOR ELEVATIONS
PROPOSED EX'fERIOR ELEVATIONS
PROPOSED EXTERIOR ELEVATION
PROPOSED BUILDING SECTIONS
ELECTRICAL P1AN
GENERAL NOTES
TYPICAL CONCRETE DETAILS
TYPICAL'aVOOD DETAILS
FOUNDATION PLAN
ROOF FRAMING PLAN
FOUNDATION DETAILS
ROOf FRAMiNG DETAILS
TITLE 24 REPORT
TITLE 24 REPORT
TITLE 24 REPORT
GENERALNOTES
I. ARChITECT/ENGINEER ASSUMES NO RESPONSIBILI'fY F(>R ANY POR710N Of TF1E 6YOR1C WttICt1 IS
PERFORMED WITttUUT A PERMIT ISSUED BY A REGULA70RY AUTFtURlTY UF TI1E MUNICIPAUTY IN
WF11CM Th1E PRUJECT IS LOCATED..
2. CONTRACTUR SttALL PERFORM TFiE bNORK IN ACCORDANCE WITh ALL APPLICABLE CODES,IAWS,
ORDINANCES,RULES AND REGULA?IONS UF ALL GOVERNING AGENGES.
3. GENERAL CONTRACTOR St1ALL APPLY.PAY FOR,AND OBTAIN ALL NEVESSAR�CONSTRUCTION
PERMITS REQUIRED BY ALL APPUCABLE BUILDING GODES AND REGULATORY GITY AND STA7E
AGENCIES UNLE55 NOTED OTFtERWISE.
4. CONTRACTOR AND SUBCUNTRACTOR St1ALL PURC!1ASE AND MAINTA;N CER71F'CATIUNS OF
INSURANCE WITF1 RESPECT TO WORKER'S COMPENSATION.PUBLIC UABILITY AND PROPERT�'
DAMAGE FOR TtiE LIMITS AS REQUIR,ED BY LA',h'.Tt1E CERTIFICATES SFIALL NAME TtiE OWNER AS
ADDITIONALLY INSURED.
5. CONTRACTOR StiALL BE RESPONSIBLE FOR INITIATING,MAINTAINING,AND SUPERVISING ALL
SAFETY PRECAUTION WITF1 Tt1E WORK INCLUDING BUT NOT LtMITED TO PROTECTION OF
PEDESTRAiNS AND ADJACENT PROPERTIES.
6. CONTRACTOR SYIALL CONFINE OPERATIONS Ar Tt1E SITE TO AREAS PER,MI?7ED BY LAW,
ORDINANCES,PERMITS AND TI1E GONTRACT DOCUMENTS.
7• INFORMATION REIATED TO Tt1E EXISTING CONDITIONS GIVEN htEREIN WAS OBTAINED FROM
OWNER PROVIDED DOCUMENTATION AVAIIABt�TO TF1E ARCFIITECT/ENGINEER AT TF1E TIME OF
DESiGN.TF1E ACCURACY OF SUCFi INFORMA710N I1A5 NOT BEEN EXtiAUSTIVELY VERIFIED.
DRAWINGS AND SPGFICATIONS ARE INTENDED FOR ASSISTANCE AND GUIDANCE BUT EXACT
N A A N NA ' 'V Y A TUA FIE D GONDITIONS AND S7ALL
DIMEN510 5 ND ELEV TIO 5 5 LL BE GO�ER,ED B C L L
BE CHECKED BY Th1E CUNTRACTOR:
. NT R F1A P N I F F". IN CONTRACT DOCUMENTS FIELD
8 CO RACTO 5 LL BE RES O 5 BLE OR C ECK G ,
CONDITIONS AND DIMENSIONS FOR AECURACY AND FOR CONfIRMING TI1AT TYtE PROJECT IS
BUILDABLE AS SF10N/N BEFORE PROCEEDING WITYt TF1E CONSTRUCTION.
9. CONTRACTOR SFIALL NOT PROCEED WITFi ANY WORK REQUIRING ADDITIONAL COMPENSATION
B�OND Tt1E CONTRACT AMOUNT WITFIOUT WRITiEN AUTFIURIZATION.FAILURE TU OBTAIN
AUTF10R1ZATION FROM TF1E O6YNER'S REPRESENTATIVE 1VILL INVALIDATE ANY CLAIM FOR
ADDITIONAL COMPENSATION.
I O.CONTRACTOR St1ALL INSTALL PRODUCTS AND APPLY FINlSt1E5 IN ACCORDANCE WITFi
MANUFAGTURER'S INSTRUCTIONS UNLE55 DiRFCTED OTHERWISE B�THE ARCF1ffECT/ENGINEER.
I I.NO WOR/�DEFEGTIVE IN CONSTRUCTION OR QUALITY OR DEFICiENT IN ANY REQUIREMENTS OF
THE CONTRACT DGCUMENTS WILL BE ACCEPTA6LE DESPITE TttE ARCh1ITECTlENGINEEe'S FAILURE
TO DiSCOVER OR POINT OUT DE`ECTS OR DEFICIENCIES DURING CONSTRUCTION.REPIACEMENT
OF DEFECTIVE WORK SIIALL NOT BE LIMITED TO ThE PROJECT WARRANTY PER10D.SUCtt WITh
St1ALL BE RFPLACED BY WORK CONFORMING WITIi TYIE INTENT OF Tt1E CONSTRUCTION
CONTRACT.NO PAYMENT,EITFIER PARTIAL OR FINAL,SYIALL BE CONSTRUED AS ACCEPTANCE OF
DEFECTiVE WORK OR IMPROPER MATERIALS.
I 2.CONTRACTOR SYtALL WAIVE"COMMON PRACTICE"AND'COMMON USAGE'PS CONSTRUCTION
CRITERIA N'HEREVER CONTRACTOR DOCUMENTS,GOVERNING CODES OR ORDINANCES REqUIIZE
GREATER QUANTIiY OR BETTER QUALITY 7HAN COMMON PRACTiGE OR COMMON USAGE WOULD
REQUIR.E.
I 3.WFtEN PORTIONS OF TF1E PROJECT ARE PERFORMED BY ThtE GONTRACTOR ON A'DESIC,N-BUILD'
BA515,Th1E CONTRAC70R StiALL BE SOLELY RESPONSIBLE FOR Tt1E DESIGN OF SUGht SYSiEMS
TO T11E REQUIREMENTS SPECIFIED IN ThE GONTRACT DOCUMENT,AND FUR THE SECURING UF
ALL 0.550CIATED PERMITS.Th1E GENERAL CONTRAGTOR Sh1All 8E RESPONSIBLE FOR THE
COORDINA710N OF ThtE'DESIGN-BUILD'SUBCUNTRACTORS,Wt10 SrIALL BE Tt1E ENGINEERS OR
RECORD FOR SUCYi SYSTEMS.DESIGN BUILD DRAWINGS SNALL BE SUBMITTED TO Tt1E
ARChtITEGT FOR REVIEW AND APPROVAL.
i 4.CONTRACTOR 511ALL PROVIDE PR07EC7iON TO ALL EXiSTING F�NISHES IN TFtE ELEVATOR LOBBY,
PUBLIC CORRIDORS AND SPACES.EXTERIOR GLAZING AND SITE FEATUP.PS.TY1E CONTP,ACTUR
Sh7ALL BE RESPONSIBLE FUR TIiE REPAIR OF ANY DAMAGES CAUSED Tt1ERFIN BY I1E UR t115
SUBCONTRACTORS.
Y
� MAXINE AVENUE � _Z
I 5.CONTRACTOR St1ALL INCIUDE TF1E PROVISION OF ALL LABOR.MATERIALS,DELIVERY AND
E�UIPMENT,INCLUDING SCAFFOLDING,SttORING,�ISPOSAL,ETC.AS REQUIRED FOR A
COMPLETE INSTALIATION OF TI1E WORK AS INDICATED FtEREIN.ALL WORK lISTED,SNOWN OR
IMPLIED ON ANV CONSTRUCTION DOCUMENT Sh1ALL BE SUPPLIED AND INSTALLED BY TI1E
GENERAL CONTRACTOR EXCEPT WIIERE NOTED OTh1ERWi5E.GENERAL CONTRACTOR Sh1ALL
COORDINATE F115 WORK N�Tti ThiA7 OF OTt1ER CONTRACTORS OR VENDORS TO ASSURP TtiAT ALL
SCYIEDULES ARF MET AND TF1AT ALL�4'URK IS DUNE IN CONFORMANCE WITYi TY1E CONTRACT
DOGUMENTS AND MANUFACTURER'S REQUIREMENTS.
I 6.CONTRACTUR St1ALL BE RPSPONSIBLE FOR TFtE DISTRIBUTION OF DR.AWINGS TO ALL TRADES
UNDER t115 SUPERVISION AND ShALL MAINTAIN CURRENT CONSTRUCTION DOCUMENTS ON TF1E
.IOB SiTE DURING ALL PF7ASE5 OF CONSTRUGTION.
17.CONTRACTOR SFIALL NOT BE REUEVED OF RPSPONSIBILITY FOR ANY DEV�ATiON FROM Tt1E
REQUIREMENTS OF TF1E CONTRACT DOCUMENTS BY ThE ARCYtITECT'S.ENGINEER'S.OR OWNER'S
REVIEN'OF TF1E St10P DR.AWtNGS.PRODUCT DATA OR SAMPLES.UNLE55 TF1E CONTRACTOR h1A5
SPEGPICALLY NOTIFfED TF1E ARCt11TECT/ENGINEER OF SUChi DEVIATION IN NRI?ING AT TF1E 71ME
OF SUBMi5510N AND Tt1E ARCFIITECT/ENGINEER h1A5 GNEN SPECIFiC APPROVAL TO Tt1E SPECiFIC
DEVIATION,
18.ALL WORK StiALL PROVIDE FOR MATERIAL EXPANSION AND CONTRACTION,SYiRINKAGE,BUILDING
OVEMEN i 5 SUFFICIENT TO PREVENT CRACKS,BUCKLING,WAR.PING,OR OTYIER DEFORMATIUN
DUE TO IIUMIDITY AND TEMPERATURE Ct1ANGE AND NORMAL LOADING.
I 9.LIFE SAFETY SY5TEM5 WORK SHALL BE PROVIDED UN A DESIGN-BUILD BA515 TFtRUUGFi TY1E
GENERAL CONTRACTOR UNLE55 NOTED OTt1ERW15E.N'ORK TO COMP!Y WITtt APPLICABLE CODES.
20.MECFiANICAL,ELECTRICAL AND PLUMBING SY5TEM5 WORK St1ALL 8E PROVIDED ON A
DESIGN-BUILD BN515 THROUGH TFiE GENERAL CONTRACTOR UNLE55 NOTED OTttERWiSE.WORK
TO GOMPLY WiT!1 APPLICABLE CODES AN�SPEGFIED PERFORMANCE REQUIREMENTS IN TNE
CONTRACT DOCUMENT.
21.TY1E ARCHITECT/ENGINEER F1AD NO KNOWLEDGE OF AND SYIALL NOT BE F1ELD LiABLE FOR ANY
ASBE5T05 OR OTFIER t1AZARDOUS MATERIALS ON TY1E PROJECT SITE.IF ASBESTOS OR OTFtER
IIAZARDOUS MATERIALS ARE DISCOVERED.STOP WORK IMMEDiATELY AND CONTACT TFtE OWNER
AND ARCHITECT FOR FURTtiER INSTRUCTIONS BEPORE PROGEEDING.
Z2,ALL CONSTRUCTION SITES MUST COMPLY U�TFt APPLICABLE PROVISIONS OF`t1E CFC CttAPiEIZ
I 4,STANDARD DETAiLS AND SPEGFlCATION 51-7.
VICINITY MAP
�
x
�
.rrr i v n., :�
41em..;i:rx�..M:h..x T,.
�
�
,..sx'iv 3v°,^� �� �
nu�cie�
���z�C.,�.*.�.,�3ssns^e��.t ��..�..
���
�'inte�rand
STRUCTURAL ENGINEERING 8 DESIGN
250 CLARATERRACE
FREMONT,CALIFORNIA 94539
T:510-299-7520 F:860-239-9159
EMAIL:IisatQintegrand-inc.com
I I _.�._
I
STAMP:
�
I QROFESSIO,�
i``��O�'��W rs C F2c
m
� ho. 4 39 �
* Exp.6 0/15 *
I sTqsIRUCNRP��\P
F�CA��F�
I
I JAN 28.2075
DATE SIGNED
�
�
�;' s .:�:o+;u� .
s
�
s :•
x
iic � �.A+:r, �'�r,
,�.
'k�96C I�Wu�Avt.
�
..�.i<a. ,a 41�a..�.taess�e��u
� 3',�` a"`5 .a ���y,r7:��"'
�'.A.c� �« � �S��'m
��'s�,� �'�3�:'��4�'�°4„vAt.r.is
�.,�t�� ,°`��w r. x.
, ,
,. ,
,. .� .� : .��.
:„ �
���£*�•�,'� u.. �
''�.%�§'o, i
.�.
p�.
`r �a �<
i� �
«:
�^
y� .1+. ��. �':..
q �' Css„7aizt�fi'.^.r.raxt';yY
. , . . . , . ..�� � . . ..
AERIAL VIEW
O � �
� � O =.
� � � �
Q � Q
Q Zx U
Z aZ
w � �_
0 0 �
� � a
� O �
U
z �
ru m "
5 � _
N
�. _
w �
� �
¢ _
< j
� �
i m
w Z Z
z
N sa <
f y�
N �
N
� � �
N
� W �c
COVER SHEET
A1 � o �
�
�WE .h�ry
PROPERN „�ti
I 8.25'
� - -
� -
�%��� � ' ' ' �
,Y�� — ' I � I
� � I
�� � ' ' I
,�'��h' " " �I �
� � � �' I I
oP�R��1NE��3'��1 �, - ' _- ' -- "__ i �
6
S� � � �
�/_%�I ' — __ -' ; II
x�,�,�;. _ I .
:
�
!
` MAXINE AVENUE -�
EXISTING 51TE PLAN
SCALE: I/8"= I'-0"
,/�integra�d
STRUCTURAL ENGINEERING 6 DESIGN
250 CLARA TERRACE
FREMONT,CALIFORNIA 94539
T.51a299-7520 F:880-239-9159
EMAIL:lisatl�integrand-inc.com
��:
QRpFESSIpNq
���0�'\�W T `Fy�
m
No.'4 9 A
* Exp.6 0/15 *
`rlsl,QUCTURP��a�P
9Tf 0�CAUF��
JAN 26,201b
DATE 81fiNED
O � Z
~ Z O
� Q J
Q ZU
�. � O
�
z
� o �
� w
a
� o ]
U
EXISTING
SI TE P�AN
A1 � 02
�'integra�d
STRUCTURAL ENGINEERING&DESIGN
250 CLARA TERRACE
FREMONT,CALIFORNIA 94539
T:510-299-7520 F:860-239-9159
EMAI L:IisatQ integrand-inc.com
STAMP:
QRpFESSIp,�,'
i���o�\�W rs(�y�'
i
� m
fvo. 4 39 �
* Exp.6 0/15 *
srsrRUCT��P��\P
�rF aF�AUF��
JAN 26.2015
DATE SIGNED
O � �
r � O
W
� Q J
Q Z �
� � o
z
z
w � f=
� o �
� w
a
� o �
�
U
`k
� m
-> _
W N
K Z
Z �
W Q
� 2
� W
a >_
o �
2 y
W Z Z
Z
y d 6
v �
N ry
N � �
N
� W �
C �
PROPOSED
SI TE PLAN
A1 � 0 �
�
;
1-
/
i
%
�
�
/
/
�
I
�I
,
�
\\
.\
.\
�
SALVAGE 4 RFUSE
(E)GARAGE BACK DOOR
,...___�_�_...____.___ ________...________._ _ .______I
GARAGE
i
�
�
�
EXISTING FLOOR PLAN
scA�e: Y4�_ ��-o°
,�integrand
STRUCTURAL ENGINEERING 8 DESIGN
250 CLARA TERRACE
FREMONT,CALIFORNIA94539
T:510-299-7520 F:880-239-9159
EMAIL:lisat�integrand-inc.com
sra�na:
---- Q�tOFESSIpHq
.i 1 y�4.a�\SA W,T �F,yc'
I r,
No. 4 39 �
� * �xP.s ons *
'�lsIRUCTU�P��a\P
; �lf OF CAL�f�4�
i
,uw�.so�s
onrE s�arieo
o � z
I �' Z O
� Q J
Q ZU
� � O
� Z
� o �
� � w
� � 0 ?
� U
`� �
� �'
� �
� �
0
c�
z
�
m
2 a
�
• ,� ,
R �
� � �
� � �
EXISTING
�!OOR P!AN
A2 � o �
�
// :
/
///
/i
,
,
I;
�
�
�\
\\
\
\\'\
�
,
�
�
�
24" I
I
I
�
PROPOSED FLOOR PLAN
SCALE: %4'= I'-O"
f integrand
STRUCTURAL ENGINEERING 8 DESIGN
250 CLARATERRACE
FREMONT,CALIFORNIA 94539
T 510-299-7520 F:860-239-9158
EMAIL:Iisat(d�integrand-inc.com
sra�a:
QROFessroro
i���O�\�W T A(�y�%
m
No.,4 9 A
,�, Exp,6 0/15 *
srsrRUCT�RP��P
�rF�F CA1.�E���
J!W 26.2015
WTE SIGNED
O � �
� � O
� Q J
Q ZU
� � O
�
z
� � w
�
�
� oU
�
� ;
� �
� _
W �
� �
W � Z
y �
H a �
c r
N �
C � � I
O �
PROPOSED
F�OOR PLAN
A2 � 02
f�integrand
STRUCTURAL ENGINEERING 3 DESIGN
250 CLARATERRACE
FREMONT,CALIFORNIA 94539
T:51a299-7520 F:860-239-9159
EMAIL:lisat�integrand-inc.com
STqMP:
QROFESS/pH
y�4.0��5A W.T 4<<nyc�
� m
No., 39 �
* Exp.6 0/15 �,
sr�TRUCTURP��a��'
�TF OF CA��FOC�
JAN 28.Y016
DATE SIONEO
O � �
� � O
� Q J
Q ZU
� � O
Z
w � E_
� o �Y
� � w
a
� oU
PROPOSED
ROOF PI_AN
� � � 0 �
i
TP �_
b
�
^� PIN.PLR
�-_
EXISTING NORTN ELEVATION
scA�e: y4�= i�-o°
_ �_�.
b
ro
FlN.FLR.
EXISTING WEST ELEVATION
scA�: y4�= i�-o�,
TP �
OI
�
---- � F�N.F�. �,
,��integrand
STRUCTURAL ENGINEERING 8 DESIGN
250 CLARA TERRACE
FREMONT,CALIFORNIA94539
T:510-299-7520 F:88Q-239-9159
EMAI L:lisat�integrand-inc.com
��:
QROF ESS/p�
����.���SA W.T ��"2
� �%
, m
No.,4 9 �
* Exp.6 0/15 ,�,
�'f SlRUCTURP��a\P
�lF OF CAl�EO�
JAN 28.P016
DATE SIONEO
O = Z
~ Z O
� Q J
Q ZU
� � O
z
w � �_
� o �
� � w
a
�! � o U
EXISTING
ELEVATIONS
A � � a1
r-- -
I �
�
FIN.FLR.
�— —
FIN.
;
�_ - - __ _ - — _
TP �
�
e0
�
F1�
EXISTING 50UTh ELEVATION
SCALE: %4'= I'-O"
r_-�
b
aD
FIN.FLR.
EXISTING EAST ELEVATION
SCALE: %4'= I�-a�
f�integrand
STRUCTURAL ENGINEERING 8 DESIGN
250 CLARATERRACE
FREMONT,CALfFORNIA 94539
T:510-299-7520 F:860-239-9159
EMAI L:lisat�integrand-inc.com
STAMP:
QRpFESSIpNq
y�'``�`'��W r �`�y%
m
No. 4 39 A
* Exp.6 0/15 *
srsrRUC1�RP�a\e
9Tf OF CAl�FO�
JAN 28.Y01fi
DATE SIGNEO
O � �
r � O
W
o a �
Q Z �
� � o
S Z
W ` �
� � W
a
� oU
`XISTING
E�EVATIONS
A � � 02
i
I
(N)CLASS A COMPOSITION
St11NGLE ROOPING TO MATCH
EXISTING,TYPICAL
_ _ _�1
i '
, ------
� - _
� ���� �
, j � I
i
�
--- - - - !- - - -
�
FIN. E
(N)GARAGE DOOR /
(N)STUCCO EXTERIOR FINI511 TO
MATCFi EXISTING,TYPICAL
(N)VINYL WINDOWS WITI1
� WOOD CASING TO MATCH
I F�CISTING,TYPICAL
TP
�——
�
ro
RO.FLR.
�
....� . ... . ._.., �.,..,: ,T _�...
1 �
:..i_� ..__ � f.. ��,:
; \ ��
... ... � ,
, ;.. .
i__"-� I
1�I
, �
f I �P
� °i �
,I
I
; �
-� -
(N)T.O.P.+/-9'-6"
(N)E(E)T.O.P.+/-8'-0"
1
,� �;�:..� �� -:..I ,� :.:y�..__. —L �. .L. . �' � _�_. �.. : � � � �;i�L_.� r�L.. .i I i � � �.
iJ—( ��-�, ' � ..t J�� L l.t..;_ .�_. .l � .� � ' 1 . - � � �
' -' �
� � 1 � i_ _
. ��...,. I � ' : ,. I : ' , j (,, r , , � i � i i ' ( � � ;i ,l 7 .
�'�__ - I,.�..i.� �,. i ' _ i.l..--.' -1, � .i_ ' .�. � �..lr :.T� .l� ��'� .l l. T.. ,
�' �_ l'_ __T��r!!� _1I �.. f �::�, � � � �1,��_�1_ � ` ,. ; � :� , `1�
._. , . _
1 ._ : � 'T1 �L1 , 'TL ; Ti ' l�`
...._
- - - - - -'� - :� �._ l� ,:_ T _,._�., _,.�..1 .r_[_.�.�.i T: .i...�i_�.�.._ :
- - - - - - - - - -- - �
- �i
_. -..__"__-_ NI
�� � -�
j i �
I
I
- - - - - - - -�- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
PROPOSED WEST ELEVATION
SCALE: Y4°= I'-0"
_� TP
b
�
RO.FLR.
3RADE
PROPOSED NORTh ELEVATION
sca,�e: Y4'= i�-a�
,,��integrand
STRUCTURAL ENGINEERING 3 DESIGN
j 250 CLARATERRACE
FREMONT,CALIFORNIA 94539
T:510-299-7520 F:860-23�9159
IEMAIL:Fsat�inbegrand-inc.com
sr�wr:
QµOf ESSIpHq
,�4��E.Q�.�gA N'•T `�2
H �
� m
Na. 4 39 �
* Exp.6 0lIS *
`Tj.sTiQUC TURP��a�P
�lF�F CA��F�i�
.uw ze,so�a
DATE 910NED
�
i� O � Z
I f" W �
� Q J
� J wV
! � ZO
Z � z
I � � �
w oa
I � � U
� I �
i
� N I
W � I
� I
� � I
t�
w Z =
� � �
R � �
� � �
o �
j —---
�
' PROPOSED
� ELEVATIONS
,,
'
' A � � O �
I
I
� —\
FlN.6RADE
TP J
I
�
b
�
FIN.FLR.
1 :,. ! __._ .L_ �._.... I_ _...I_ _ _ . _.. � I_ _ . � i ! � � !_ I� - -
; ,
.. .. : i � ; :.... .. . . . . �. i' � .�.. . . . �� r-�-�. � � r . � �. , ,, --�--r- . , ,
i �
i
i i i
f i
._ .. � _. . . ,.
,
. � 1 __ ' .__. � _,_.�t_r �.1 ' _ _1 _L _ _ '_ . __ _ _t�;
� � . .
� � . , ; �� � , : .
-_i_ . . �- , . . � , �---�- i -
� ._. __. ! __ ,.. ._... ...T:_ ._� �:.. .:. : _� _ . _ . .�. � .� _�- -- -. . _ . _1 � _ . .�,. .�_�..._.. r... . ��. ���
� � ; ; � �
_1
r
_"�� I
rl
, . . .
._.. 1.:. � ... . �. . .. �... .'.. ._. ... �'._... . ......' ' �
__ • �. . � ; . � • � , I j � . � �. . , j
. . . ...--� ,.'.� , .. ' 'I r. ._ �._.I......�u�1�-_I�.l i_ ._I.� �...L_"". . 1.J . :.�� 1.._.-�r. 1._ i_ 1.� ' �,i_. -.J.�t .L.1._.�_�.i..� I
____._...! .._. _. _._. � -- ' - �-'- - -- - -..... _ 1 ,
_ __. -- -
,
� . .. .r._ .,. _ _.... ...:. : ._ �_._�_ :_�..!- .. . ... r..,,�_ � l -- 1 ,_� _ . _..i.. r., ��:�' . 1 _ .,�.�:-. .. �:��..._ �;_� �
; : : ,. .i i ; � . �. �� �, j j � ; : i�. . . � � r . :.�.i ..i._�T� ._.�,�I:'.. ...i I . , ....i.;, I� � ; , ."-� ..'-ly. ::�..';
,. I
, ,� �
1
, � T _ _l_. � —1 1 _.___� � 7 � _ . 1 .
; . ��J r�---;- �-T J � , __� `� , _,, T ___.�.1 �'1-,--, ' �. r:T�__�' � �`�
—,_i_.� :_ _ _ -..—- L';_ '- : _:_._1 ..J__�T� _i 1 . i I J � � _J_ i � i � �
�- ' �_1-- -�- ---.: .,_ _ _= !- �--�-.� _l. �? _ ! _.-� 1 t� � � _1_ _�_L- ' T; =--�-�--1 -- � � r'-"�;T � , _��� - 1�.._`r��
— — --- — — — — ---� T�--� � — $==� ; .�- ' 1 `�:�,�--�.�-�-.�- --�._. �,: _ � ��
, ,
� � � s :. s � s �
I . N s i �
I � �i � �
-- r �.I � i
L
�
EXISTING SOUTh ELEVATION
(N O C r1 AN G E) scA�: y4'= i�-o��
�
�
�
FlN.FLR.
PROPOSED EAST ELEVATION
ScA�e: Y4�= i�-o°
� f�integrand
STRUCTURAL ENGINEERING 6 DESIGN
I
250 CLARA TERRACE
FREMONT,CAUFORNIA 94539
IT:510-298-7520 F:860-239-9159
EMAIL:asat�integrend-inc.com
t
srnMa:
� QRpFESS/pNq
! y�.E.���SA W.l !�"y�
m
No., 9 �
* Exp,6 0/15 *
'!}�l�pbC 7URP��\P
�lf aF CAUF�fi
JAN 28.2016
DATE 9GNFD
O � Z
� Z O
� Q J
Q ZU
� � O
�
z
� ° w
�
a
� oU
t
i
�
� �'
�
Z
W
� �
O �
�
W � _
N �
_ a
� n
I
w � ry
r p NZ
� � Y
PROPOSED
E�EUATION 8c
SCHEDU�ES
A � � 04
�
i
b
`i
+
� `Z. V�. % .�Y
r �
I
STORA6E KITCHEN
GARAGE
— — , �— __-___ _::-.-
i
PROPOSED BUILDING SECTION 2
sca,�e: y4�= i�-o°
_ I ST FLR TP
b
�
__ I ST F.F.
�I
0
N
+
I �
� b I fr :v
�L..� p �r i, �Y
il!
LIVING/FAMILY BATH I ;! MASTER BATH
� � �
MASTER BEDROOM DINING II LIVING/FAMILY
L-
PROPOSED BU I LDI NG_SECTION 1
scA�: y4°= i�-o°
INSULATION SCHEDULE
(N)ATfIC R-30 BATT INSUTATION
f�integrand
STRUCTURAL ENGINEERING&DESIGN
250 CLARATERRACE
FREMONT,CALIFpRNIA 94539
T:510-299-7520 F:860-239-9159
EMAI L:lisat�integrand-inc.com
STAMP:
o QµOf ESSlp,yq�
y�4,��SA W.r F,y`+
, m
No. 4 39 �
* Exp,6 ons *
sf SlR�CN�P��a�P
�rF�F CAL�F�f�
JAN 48,2015
DATE SIGNED
O � Z
�' Z O
o ¢ �
Q ZU
�. � O
�
z
� ° w
�
a
� oU
� (E)ATTIC R-30 BATf INSULATION ,
--- -- i
(N)�XlERIOR WALL R-I 3 BATf INSULATION �
- - <
____ i (E)�(TERIOR WAl1 R-I 3 BLOWN-IN INSUlAT10N Z i� ,
- C� -- - -�,- - --- - r� ,
�� i (N)E(E)RAISED FLOOR R-I 9 BATT INSULATION '�� �u � I
� u ! �
,% ,;,; H' ,�, SEE T�TLE 24 REPOKT FOR DEfAILED ENERGY COMPLIANCE REOUIREMENTS. W
Ez 55 �� __ � -- � �
— 1Di - — o �
WINDOW SCHEDULE Z y
' �
— — — — — — — —- — — — — — — — --- — — — — � FIN_FLR.____fi_ O 3'0"x I'8° ——VINYL SUDING -- � 4 �
� � � � � O 6�x4'0' _ VINYL SLIDING EGRE55 �
CO 5'0"z4'O° VINYL SLIDING � �p
N lV
Q 5'O'x3'O` VINYL SLIDING � ��
' � � �
— — — - - Q 9'0"x3'0' VINYL SLIDING/FIXED/SLIDING i
I� � _" �
! i� ,�,. �,I O 9'0'x5'0' VINYL SIIDING/FIXED/SLIDIN6
I' �'�
j ap ALL NEW WINDOW''<GIAZED DOORS SHALL BE DOUBLE-PANE LOW-E 6LAZING PER TITLE 24 REPORT.
£ ' � ALL NEW SKYUGIiTS Sh1ALL BE BY VELUX,WITFi TEMPERED GLAZING AND MANUFACTURER�S F���N��5. P R 0 P 0 S E D
EGRPSS WINDOWS SHALL MEET ALL OF TFiE FOLLOWING REQUIREMENTS: B U I L D I N G
SILL HEIGHT SHALL NOT PXCEED 44 INCHES ABOVE FINI9FIED FLOOR.
_ _ _ _ _ _ _ _ _ _ _ FIN.F� � MIN.NET CIEAR OPENING ShALL BE 5.7 SQUARE FEET. S E C T I O N S
— MIN.NET CLEAR OPENING F1�16F1T SHALL BE 24 INCt1E5.
O ' ! O ' MIN.NEf CLEAR OPENING WIDTN SFIALL BE 20 INCMES.
� GENERAL CONTRAGTOR TO MEASURE AND FIEID VERIFY ALL DIMENSIONS OF ROUGFt FRAMING PRIOR TO ORDERING ANY
WINDOWS AND DOORS. NOTIFY THE DE5IGNER/ENGINEER IMMEDIATELY OF ANY DISCREPANCIES BEFORC PROGEEOING.
A � � 05