HomeMy WebLinkAboutAH 10-09-2014Administrative Hearing
October 9, 2014
Cupertino, CA 95014
(408) 777-3308
APPROVED MINUTES OF THE REGULAR MEETING OF
THE ADMINISTRATIVE HEARING HELD ON October 9, 2014
ROLL CALL
Hearing Officer present: Gary Chao, Assist. Director of Community Development
Staff present:
Applicant(s) present:
APPROVAL OF MINUTES:
Colin Jung
Kevin Chiang (Home of Christ Church)
June 26, 2014
The minutes of June 26, 2014 were approved as written
WRITTEN COMMUNICATIONS:
None
POSTPONEMENTS/REMOVAL FROM CALENDAR:
None
ORAL COMMUNICATION:
None
PUBLIC HEARING:
1. Application No.(s): ASA -2013-01, TR -2013-02
Applicant: Kevin Chiang (Home of Christ Church)
Location: 10420 Bubb Rd
Architectural and Site approval to allow fagade and roof modifications of an existing office
building for church assembly use, additional improvements include parking lot, landscaping,
a trellis and trash enclosures;
Tree removal permit to allow the removal and replacement of three trees that are part of an
approved landscape plan for a proposed church in an existing office space
Administrative Hearing decision final unless appealed.
Staff Member Jung reported that the application is to allow the applicant to facilitate moving forward
with a prior approval to move church assembly uses into an existing building already located on the
Church's property. The applicant is proposing some simple fagade and landscaping changes to the
site. The property is currently occupied by the Church and by Apple, Inc. There is a shared parking
agreement between the two parties. The Church uses for parking normally happen outside the
2 Administrative Hearing
October 9, 2014
operating hours for the Apple employees, so there is no impact to surrounding businesses. The
applicant is proposing changes to the entry and exits to the Church. They will be adding mechanical
equipment to the rooftop for a new HVAC system and new skylights. There is also an ancillary shed
roof which will be part of the new sanctuary space which will be incorporated into the new design.
The applicant is also proposing to remove three trees at the front of the property. The applicant will
replace them with five new trees at the southern part of the property. There will also be new shared
trash enclosure. The northern side of the property is currently under development by Apple, Inc. The
applicant's proposal is for the southern side of the property.
Hearing Officer Chao asked about the roof screen. He expressed concern about the large screening
wall. Architect, Kevin Chiang explained that the new screening wall would replace the existing wall,
not be on top of it, and would sufficiently hide the new equipment. The Hearing Officer expressed a
concern that the rooflines would not hide the rooftop equipment due to the various angles. Architect
Chiang explained that the existing roof's structural design necessitated this new screening wall design
and as a benefit, the Church's maintenance personnel would have easier access to the roof.
The Hearing Officer asked that clarification of the roof design be discussed with Staff as part of the
building permit process to explore options to reduce the size of the proposed screening wall.
He Hearing Officer was also concerned about the vertical metal corrugated walls, he asked the
applicant to work with Staff to see about the option of using horizontal panels to help reduce the
visual mass to the structure.
DECISION: The applications were approved by the Hearing Officer per the draft resolutions with
modifications:
To require the applicant to work with Staff to reduce the size of the screening wall and to
look at the possibility of using horizontal metal wall panels rather than vertical ones.
ADJOURNMENT
Respectfully submitted:
Beth Ebben
Administrative Clerk
g:planning/AH Committee/Minutes100914