Loading...
HomeMy WebLinkAboutAH Packet 11-13-14 City of Cupertino 10300 Torre Avenue, Cupertino, California 95014 (408) 777-3308 ADMINISTRATIVE HEARING AGENDA Conference Room C Thursday, November 13, 2014, 5:00 p.m. ORDER OF BUSINESS: ROLL CALL APPROVAL OF MINUTES October 9, 2014 WRITTEN COMMUNICATIONS None ORAL COMMUNICATIONS (Reserved for persons wishing to address the Hearing Officer on issues that are not already included on the regular Order of Business) ITEMS: 1. Application No.(s): ASA-2014-08, TR-2014-59 (EA-2011-12) Applicant: Wolfgang Wagener (Apple Campus 2) Location: properties located east and west of N Tantau bounded by Calabasas Creek to the north and west, City of Santa Clara limits to the east and I-280 to the south Architectural and Site approval to review office, research and development facilities in three buildings, associated parking structure, restaurant and site improvements for Phase 2 of a previously approved office, research and development campus; Tree Removal Permit to refine a previously approved Master Tree Removal Permit (TR-2011-39) for an office, research and development campus Administrative Hearing decision is final unless appealed ACTION TO BE TAKEN: Approve or deny ASA-2014-08 Approve or deny TR-2014-59 ADJOURNMENT If you challenge the action of the Hearing Officer at the Administrative Hearing in court, you may be limited to raising only those issues you or someone else raised at the public meeting described in this notice, or in written correspondence delivered to the City of Cuper tino at, or prior to, the meeting. Please note that the policy for oral communication is to allow an applicant and groups to speak for 10 minutes and individuals to speak for 3 minutes. In the event an action taken by the Hearing Officer is deemed objectionable, the matter may be officially appealed to the Planning Commission in writing within fourteen (14) days of the date of the Hearing Officer’s decision. Said appeal is filed with the City Clerk (Ordinance 632) Page 3 Administrative Hearing Committee October 23, 2014 In compliance with the Americans with Disabilities Act (ADA), the City of Cupertino will make reasonable efforts to accommodate persons with qualified disabilities. If you require special assistance, please contact the city clerk’s office at 408-777-3223 at least 48 hours in advance of the meeting. Administrative Hearing October 9, 2014 Cupertino, CA 95014 (408) 777-3308 ACTION MINUTES OF THE REGULAR MEETING OF THE ADMINISTRATIVE HEARING HELD ON October 9, 2014 ROLL CALL Hearing Officer present: Gary Chao, Assist. Director of Community Development Staff present: Colin Jung Applicant(s) present: Kevin Chiang (Home of Christ Church) APPROVAL OF MINUTES: June 26, 2014 The minutes of June 26, 2014 were approved as written WRITTEN COMMUNICATIONS: None POSTPONEMENTS/REMOVAL FROM CALENDAR: None ORAL COMMUNICATION: None PUBLIC HEARING: 1. Application No.(s): ASA-2013-01, TR-2013-02 Applicant: Kevin Chiang (Home of Christ Church) Location: 10420 Bubb Rd Architectural and Site approval to allow façade and roof modifications of an existing office building for church assembly use, additional improvements include parking lot, landscaping, a trellis and trash enclosures; Tree removal permit to allow the removal and replacement of three trees that are part of an approved landscape plan for a proposed church in an existing office space Administrative Hearing decision final unless appealed. Staff Member Jung reported that the application is to allow the applicant to facilitate moving forward with a prior approval to move church assembly uses into an existing building already located on the Church’s property. The applicant is proposing some simple façade and landscaping changes to the site. The property is currently occupied by the Church and by Apple, Inc. There is a shared parking agreement between the two parties. The Church uses for parking normally happen outside the 2 Administrative Hearing October 9, 2014 operating hours for the Apple employees, so there is no impact to surrounding businesses. The applicant is proposing changes to the entry and exits to the Church. They will be adding mechanical equipment to the rooftop for a new HVAC system and new skylights. There is also an ancillary shed roof which will be part of the new sanctuary space which will be incorporated into the new design. The applicant is also proposing to remove three trees at the front of the property. The applicant will replace them with five new trees at the southern part of the property. There will also be new shared trash enclosure. The northern side of the property is currently under development by Apple, Inc. The applicant’s proposal is for the southern side of the property. Hearing Officer Chao asked about the roof screen. He expressed concern about the large screening wall. Architect, Kevin Chiang explained that the new screening wall would replace the existing wall, not be on top of it, and would sufficiently hide the new equipment. The Hearing Officer expressed a concern that the rooflines would not hide the rooftop equipment due to the various angles. Architect Chiang explained that the existing roof’s structural design necessitated this new screening wall design and as a benefit, the Church’s maintenance personnel would have easier access to the roof. The Hearing Officer asked that clarification of the roof design be discussed with Staff as part of the building permit process to explore options to reduce the size of the proposed screening wall. He Hearing Officer was also concerned about the vertical metal corrugated walls, he asked the applicant to work with Staff to see about the option of using horizontal panels to help reduce the visual mass to the structure. DECISION: The applications were approved by the Hearing Officer per the draft resolutions with modifications: To require the applicant to work with Staff to reduce the size of the screening wall and to look at the possibility of using horizontal metal wall panels rather than vertical ones. ADJOURNMENT Respectfully submitted: /s/Beth Ebben Beth Ebben Administrative Clerk g:planning/AH Committee/Minutes100914 ADMINISTRATIVE HEARING STAFF REPORT Agenda Item No. 1. Agenda Date: November 13, 2014 SUBJECT Architectural and Site Approval for Sites C and D of Phase 2A of a previously entitled office, R&D campus (Apple Campus 2) and update to a previously approved Tree Removal Permit RECOMMENDATION Staff recommends that the Hearing Officer approve the: 1. Architectural and Site Approval, ASA-2014-08 in accordance with the Draft Resolution (Attachment 1) 2. Tree Removal Permit, TR-2014-59, in accordance with the Draft Resolution (Attachment 2) DESCRIPTION A. Application Summary Applications: ASA-2014-08 and TR-2014-59 Applicant: Wolfgang Wagener Property Owner: Apple Inc. Property Location: Properties located east and west of N. Tantau Avenue bounded by Calabazas Creek to the north and west, City of Santa Clara limits to the east and Interstate 280 (I-280) to the south APNs: 316-06-038; 316-06-039; 316-18-025; 316-18-026; 316-18-027 B. Project Description 1. Architectural and Site approval to review office, research and development facilities in three buildings, associated parking structure, restaurant and site improvements for Phase 2 of a previously approved office, research and development campus. 2. Tree Removal Permit to refine a previously approved Master Tree Removal Permit (TR - 2011-39) for an office, research and development campus. OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3308 • FAX (408) 777-3333 • planning@cupertino.org ASA-2014-08, TR-2014-59 Apple Campus 2 November 13, 2014 Sites C and D Page 2 C. Project Data Summary Existing/Approved Proposed General Plan Designation Industrial/Residential No change Zoning Designation P(MP) No change Consistency with General Plan Yes Yes Consistency with Zoning Yes Yes Environmental Assessment Apple Campus 2 Final EIR (certified Oct. 15, 2013) Addendum to Final EIR prepared (Attachment 3) Site Area (acres) 15.83 No change Hardscape 12.48 10.77 Softscape 3.35 5.06 Total Development Area (sq.ft.) 1 925,000 980,800 Total Building Area 525,000 516,000 Office 280,000 288,050 Restaurant 20,000 15,950 North Testing Facility 225,000 70,000 South Testing Facility 142,000 Total Unoccupied Area 32,000 34,800 Satellite Plant South 32,000 2,800 Data Center (basement of Parking Structure) - 32,000 Employees 1,400 1,400 Parking Surface 300 241 Below-Grade 840 279 Parking Structure 0 620 Bicycle Parking (min. 5% of automobile parking requirement at 1 stall/285 s.f.) Required – 91 Provided > 91 Setbacks Front Setback (min.)  15’  1:1 slope line on N. Tantau Avenue Consistent with previous entitlements ASA-2014-08, TR-2014-59 Apple Campus 2 November 13, 2014 Sites C and D Page 3 Existing/Approved Proposed Street Side Setback (min.)  15’ Consistent with previous entitlements Setback from Creek  Subject to requirements of the Streamside Modification Permit under Municipal Code Chapter 19.19, Water Resources Protection Consistent with previous entitlements Rear setback (min.)  25’  Adjacent to residential zones – 100’ Consistent with previous entitlements Building Height (max.) Up to 60’ Consistent with previous entitlements Tree Removal 235 trees 263 trees 1 Site B of Phase 2 is not part of the current ASA application BACKGROUND The applicant, Apple Inc., received approval from the City Council in November 2013 to demolish existing office, research and development buildings and replace them with a new office, research and development campus to be developed in two phases. The project, referred to as Apple Campus 2, is located in the North Vallco Area and encompasses approximately 176 acres. While Apple received entitlements for the entire project site, including the establishment of the building envelope for Phase 2 of the project, Architectural and Site Approvals were only obtained for Phase 1. At this time, Apple is seeking architectural review for a portion of Phase 2 of the project. This portion of Phase 2, which is referred to as Phase 2A, includes Sites C and D located east and west of North Tantau Avenue, bounded on the west and north by Calabazas Creek, the City of Santa Clara city limits on the east and I-280 to the south. Site B which encompasses the remainder of the Phase 2 area, or Phase 2B, is not part of the current Architectural and Site Approval application. The surrounding land uses include:  To the north and west: Office, research and development facilities  To the south: I-280 freeway; and  To the east: Single family residential uses and Jenny Strand Park, abutting the I-280 freeway, both in the City of Santa Clara ASA-2014-08, TR-2014-59 Apple Campus 2 November 13, 2014 Sites C and D Page 4 With the approved entitlement from November 2013, Phase 2 (Sites B, C and D) may consist of up to 600,000 square feet of office and research and development buildings with 1,740 parking stalls and two satellite plants for energy generation. DISCUSSION Architectural and Site Approval Application Site Plan The 15.83-acre project area encompasses Sites C and D of Apple Campus 2 Phase 2. Site C is located on the east side of N. Tantau Avenue and will be developed with two testing facilities, parking garage and satellite plant. Site D is located on the west side of N. Tantau Avenue and proposes an office building, including a 300-seat employee cafeteria and approximate 100-seat outdoor terrace with a food kiosk. A total of 1,140 parking spaces will be provided on Sites C and D, consistent with the original project approval, to meet the parking demand for this phase of development. The number of parking spaces required for the entire project was determined by conducting a parking study of Apple’s current campus at Infinite Loop and properties at Mariani Avenue. While the total number of parking spaces remains the same from the previously approved plans, the configuration has changed with the proposed construction of a parking garage, increasing the number of surface (or above -grade) parking spaces from 300 stalls to 861 stalls and decreasing the number of below-grade spaces from 840 parking stalls to 279 stalls. A total of 26 electric vehicle (EV) charging stalls plus two accessible EV stalls are provided onsite. Fire access to the property will be provided from a signalized intersection on N. Tantau Avenue, with secondary fire access provided via a staircase from N. Tantau Avenue close to the I-280 freeway overpass near the parking structure, as approved by the Santa Clara County Fire Department. Sitework and Grading A moderate amount of grading is expected to occur on the project site to accommodate the basement parking garage for the office building proposed on Site D and the basement of the parking structure on Site C which will be used utilized as a Data Center. Up to 160,000 cubic yards (c.y.) of excavated material was previously analyzed in the project EIR, with the majority (150,000 c.y.) planned for off-haul from the site. Under the current proposal, 110,000 c.y. will be excavated and 90,000 c.y. will be off-hauled. A large percentage of the excavated material retained on site will be used for the placement of landscaped berms around the site. The amount of excavation has been reduced since the approval of the project due to the elimination of a large basement parking area previously planned on the East side of Tantau Avenue. Building Architecture The architectural design for the proposed office building and testing facilities is compatible with the main Apple Campus 2 concept. The buildings have a simple design ethic and feature a ASA-2014-08, TR-2014-59 Apple Campus 2 November 13, 2014 Sites C and D Page 5 mostly glass façade with a white opaque blade glass awning at each level, capped by a parapet at the top floor. The heating and cooling equipment for the buildings is located on the roof and screened by a metal, mechanical screen with a horizontal louver design. The design of the parking garage and satellite plant also follow the simple design ethic as described below. Energy efficiency is a large consideration in the design of the buildings. One of the objectives for the Apple Campus 2 development is to achieve a net zero energy development by constructing energy efficient buildings, generating a significant amount of the Campus’ energy from on-site renewable sources. Office Building A 4-story office building is proposed on Site D, which is bounded by Calabazas Creek to the west and the north, N. Tantau Avenue to the east and I-280 to the south. The office building consists of 288,050 square feet of office space, 15,950 square feet of amenity space including a 300-seat cafeteria and espresso bar and coffee areas on each level, and an underground parking garage with 279 parking spaces. In addition, the site also includes an outdoor food kiosk with an outdoor terrace to seat approximately 100 employees. The building is comprised of three pods. Two of the three pods are mirror images of each other on levels two to four but are different on the first floor. The first floor includes the cafeteria in the pod located at the north end of the building while the pod at the south end includes locker rooms and some office space. The third (central) pod comprises of office space on all four levels. The two end pods are connected with the central pod by common areas including lobbies, staircases and elevators, restrooms, print and copy rooms, and meeting rooms. The office building will be approximately 56 feet above grade, plus an additional 12 feet for the rooftop mechanical screen. Testing Facilities As noted above, the two testing facilities on Site C have a similar architectural design as the proposed office building. The testing facilities, however, will only be 2-stories (approximately 35 feet) in height. The rooftop mechanical screen extends 10 feet above the roofline. The north testing facility is approximately half the footprint of the south testing facility. Parking Garage The main parking garage for this phase of development is located on the east side of N. Tantau Avenue closest to I-280. This facility will contain 620 parking spaces including 588 standard spaces, 13 accessible spaces, 18 EV charging stalls and one accessible EV stall . Access to the garage is from a controlled intersection on N. Tantau Avenue. The structure consists of five parking levels with 108 to 133 parking spaces on each level. The façade of the structure is similar to the main parking garage on the Phase 1 portion of the project and consists of concrete ASA-2014-08, TR-2014-59 Apple Campus 2 November 13, 2014 Sites C and D Page 6 columns with cable rails stretched between them. In addition, there is a 32,000-s.f. basement consisting of a data center, mechanical rooms and ancillary storage space. The parking garage incorporates photo-voltaic (PV) panels mounted on the rooftop. The plans indicate two options for the parking garage, one with a mesh façade and one without the mesh façade. The applicant has indicated that the owners have shown a preference for the façade without the mesh for purposes of construction. A condition has been added to reflect this change. Satellite Plant South of the parking structure is a 2,800-sq. ft. satellite plant building and associated service yard. The satellite building will house chillers and cooling towers to serve the data center in the basement of the parking structure. The chillers will be fully enclosed within the satellite building on the ground level, with the cooling towers located above the chillers and surrounded on all four sides by the building walls but open to the sky above. The building will be constructed of CMU block with metal horizontal louver cladding, similar to the metal horizontal louver design proposed for the rooftop mechanical screens. The surrounding service yard consists of mechanical and electrical equipment including back-up generators, electrical substation, water and fire pumps and two trash compactors. Ligting A condition has been added for review and approval of a photometric plan prior to building permit issuance to ensure that there is no offsite glare or that light sources are not visible. Landscaping & Fencing The proposed landscaping is consistent with the City’s requirements related to Water Efficiency. A condition has been added to ensure that a Landscape Project Submittal is submitted prior to issuance of final occupancy. Existing fencing along the I-280 frontage is proposed to be replaced with a soundwall and sections of the fencing along the rear property line, adjacent to the existing residences in the City of Santa Clara, is proposed to be replaced with 8-ft tall wall. A condition has been added to require review and approval of landscape screening of the soundwall from the freeway prior to issuance of final occupancy. Amenity Space The amenity space indicated on these plans is consistent with the entitlement for the project. While approved office space may be converted to amenity spaces, the existing amenity space may not converted to office space without modification of the Development Agreement approved by the City. A condition of approval has been added to restrict the conversion of any amenity spaces to non-amenity spaces. ASA-2014-08, TR-2014-59 Apple Campus 2 November 13, 2014 Sites C and D Page 7 Tree Removal Permit The overall Apple Campus 2 site included 4,506 existing trees, mainly located within the Phase 1 portion of the project in parking lot landscaped islands, interior courtyards and around the Glendenning Barn. The EIR evaluated the removal of 3,620 trees, of which 90 would be relocated elsewhere on the site and approximately 800 trees would be saved in place where grading would not affect the existing trees. Sites C and D of Apple Campus Phase 2 included 407 existing trees, of which 235 trees were approved for removal while the rest of the project was approved for removal of 3,337 trees. Under the current application, adjustments are being made to the number of trees being removed on the project, however, the number of trees being removed do not exceed the number of trees studied for removal in the EIR. Adjustments are as follows:  Phase 1: In addition to the trees previously proposed to be retained on the site, Apple was able to retain ten trees in place and transplant nine additional trees. 17 additional trees needed to be removed to facilitate widening of Wolfe Road or installation of traffic related mitigation measures at the intersection of Homestead Road and Tantau Avenue. Four additional trees on the interior of the site needed to be removed due to conflicts and ill-health.  Phase 2A (Sites C and D): In addition to the trees previously proposed to be retained or transplanted, Apple is proposing to retain ten trees in place and transplant one tree. Four trees previously identified as being retained in place are proposed to be transplanted. The majority of the trees along the eastern edge of site D, adjacent to the existing homes in the City of Santa Clara, are being saved; thereby, ensuring that the existing mature trees will provide adequate buffer from the ongoing construction and provide a mature canopy for the campus upon project construction. However, the removal of 39 additional trees is needed as a result of site plan refinements and due to ill health and stress from the drought and lack of irrigation in certain areas of the site. The removal of these trees are not located adjacent to the existing homes in the City of Santa Clara. Trees proposed for removal are located as follows:  27 trees in the southeast area of site D adjacent to I-280 and N. Tantau Avenue, and  12 trees along the eastern property line adjacent to the Jenny Strand Park. In addition to the 138 trees that will remain and six trees to be transplanted, a pproximately 780 trees will be planted on-site as replacement for the trees being removed in accordance with Municipal Code requirements. Details of the tree replacements are provided on Page 4.30 of the plan set (Attachment 5 – Plan Set). The City’s consulting arborist, Michael Bench, concurred ASA-2014-08, TR-2014-59 Apple Campus 2 November 13, 2014 Sites C and D Page 8 with and recommended approval of the proposed tree removal plan (Attachment 4). ENVIRONMENTAL REVIEW The California Environmental Quality Act (CEQA) requires that all State and local governments consider the consequences of projects over which they have discretionary authority. The Environmental Impact Report (EIR) created as a result of review under CEQA must disclose the significant environmental impacts of the project and, in addition, identify the following:  Significant cumulative impacts of the project in combination with past, present and reasonably foreseeable future projects.  Mitigation measures and alternatives to reduce these effects;  Significant impacts that cannot be avoided;  Growth-inducing impacts; and  Effects found not to be significant. An EIR was prepared in accordance with the requirements of CEQA. The EIR reviewed the Phase 2 portion of the project based on the building envelopes proposed by Apple. The proposed plans indicate the that buildings are within the envelopes approved previously by the City Council. The proposed plans have been evaluated by LSA Associates, Inc. in their memo dated November 4, 2014 and the analysis indicates that the architectural refinements that the applicant is seeking would not require major revisions to the Final EIR certified on October 15, 2013, due to new or substantially increased significant environmental effects. Furthermore, there have been no substantial changes with respect to the circumstances under which these refinements would be undertaken that would require major revisions of the Final EIR due to new or substantially increased significant environmental effects, and there has been no discovery of new information of substantial importance that would trigger or require major revisions to the Final EIR due to new or substantially increased significant environmental effects. The certified Final EIR adequately identifies all environmental effects and adequate mitigation measures for the proposed modifications to the previously approved project. Therefore, no subsequent or supplemental EIR is required prior to approval of the Architectural and Site Approval to Phase 2A of Apple Campus 2 Project described above. NOTICING AND COMMUNITY OUTREACH A brief summary of outreach on the project is presented in the table below: Notice of Public Hearing, Site Notice & Legal Ad Agenda  Site Signage (14 days prior to the hearing)  Adjacent noticing to neighbors along the eastern property line for all phases of project (10 days prior to the hearing)  All interested parties (emailed/noticed) (at least 10 days prior to the hearing)  Posted on the City's official notice bulletin board (one week prior to the hearing)  Posted on the City of Cupertino’s Website ASA-2014-08, TR-2014-59 Apple Campus 2 November 13, 2014 Sites C and D Page 9 Public Comments The City received one phone call from a concerned resident of the City of Santa Clara regarding the height of the nearby testing facilities. The proposed 2-story building (approx. 35 ft. in height plus 10-ft. roof screen) will replace an existing 1-story building. While the testing facility will exceed the height of the existing building on-site, the proposed building is under the 60-ft height allowance studied in the EIR and approved with the Apple Campus 2 master plan. PERMIT STREAMLINING ACT This project is not subject to the Permit Streamlining Act (Government Code Section 65920 – 65964). The City has 60 days from the date of application to make a decision on the project. NEXT STEPS The Hearing Officer’s decision on this project is final unless an appeal is filed within 14 calendar days of the date of the mailing of the decision. All approvals granted by the Hearing Officer shall go into effect after 14 days. Prepared by: Piu Ghosh, Senior Planner ATTACHMENTS 1. Draft Resolution ASA-2014-08 2. Draft Resolution TR-2014-59 3. Third Addendum to Environmental Impact Report dated November 4, 2014 4. Michael Bench Memo - Review of Trees Proposed for Removal 5. Plan Set dated October 2014 ATTACHMENT 1 ASA-2014-08 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRAFT RESOLUTION OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL PERMIT FOR PHASE 2A (SITES C AND D) OF APPLE CAMPUS 2 SECTION I: PROJECT DESCRIPTION Application No.: ASA-2014-08 (EA-2011-12) Applicant: Wolfgang Wagener (Apple Campus 2) Property Owner: Apple, Inc. Location: Properties located east and west of N. Tantau Avenue bounded by Calabasas Creek to the north and west, City of Santa Clara limits to the east, and Interstate 280 to the south (APNs: 316-06-038 & -039; and 316-18- 025 thru -027) WHEREAS, based on substantial evidence in the administrative record, on October 15, 2013, the City Council held a public hearing to consider the approval of an office, research and development campus; and WHEREAS, after consideration of evidence contained in the entire administrative record, at the public hearing on October 15, 2013, the City Council adopted Resolution No. 13-082 certifying the EIR, adopting Findings and a Statement of Overriding Considerations, adopting Mitigation Measures, and adopting of a Mitigation Monitoring and Reporting Program; and WHEREAS, the City Council approved an office, research and development campus for Apple Inc. including entitlements for a phased development of the campus which included the development of properties along N. Tantau Avenue in separate phases; and WHEREAS, an application was received by the City (Application ASA-2014-08) for Architectural and Site Approval to allow office, research and development facilities in three buildings, associated parking structure, restaurant and site improvements for Phase 2 of a previously approved office, research and development campus; and WHEREAS, an application was received by the City (Application No. TR-2014-59) to refine a previously approved Master Tree Removal Permit (TR-2011-39) for an office, research and development campus; and Draft Resolution ASA-2014-08 November 13, 2014 Page 2 WHEREAS, the Architectural and Site Approval is required for the previously entitled office, research and development buildings with associated parking facilities; and WHEREAS, the Tree Removal Permit is required to allow refinements to the previously approved Tree Removal Permit; and WHEREAS, the necessary public notices have been given as required by the procedural ordinances of the City of Cupertino and the Government Code, and the Administrative Hearing Office held a public meeting on November 13, 2014 in regard to the applications; and NOW, THEREFORE, BE IT RESOLVED: After careful consideration of the, maps, facts, exhibits, testimony and other evidence submitted in this matter, the Administrative Hearing Officer hereby approves Application No. ASA-2014-08 based upon the findings described in Section II of this resolution, the administrative record, and subject to the conditions specified in Sections III, IV and V of this resolution. SECTION II: FINDINGS WHEREAS, the Administrative Hearing Officer finds that: 1. The proposal, at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare or convenience; The Project is designed to minimize the impact upon the surrounding community and the environment. In order to reduce its impact on the environment, the Project will utilize onsite photovoltaics and fuel cells and obtain the remainder of its energy needs from the State of California Direct Access Program, off-site Apple-owned renewable energy projects or grid-purchased renewable energy. The project has been designed to minimize its impact upon the neighbors, adjacent roads and freeways and the environment. Appropriate mitigation measures to address traffic impacts along with the implementation of an aggressive but achievable Transportation Demand Management Plan will further reduce the traffic impacts of the project. Adequate buffer has been provided around the project to allow privacy and to reduce impacts to neighbors. The project will be part of a corporate bike sharing program. The project also has an on-site restaurant with several smaller indoor and one outdoor dining facility. The project increases the amount of landscaped green space over the existing conditions. The project will incorporate both young and mature trees, and native and drought tolerant plants, that will thrive in Santa Clara County with minimal water consumption. The project proposes to add at least 780 additional trees to the site and increase the pervious surface areas on site significantly improving stormwater quality and reducing run-off. Adequate emergency access has been provided on site. The design of the Project and its environmental attributes are not detrimental to the health, safety, peace, morals and general welfare of persons residing or working in the neighborhood of the subject parcels. Draft Resolution ASA-2014-08 November 13, 2014 Page 3 2. The proposal is consistent with the purposes of this chapter, the General Plan, any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: The project is in compliance with the General Plan and the Zoning regulations governing the project site. The architecture of the proposed project particularly furthers General Plan Policy 2-14: Attractive Building and Site Design “by careful attention to building scale, mass and placement, architecture, materials, landscaping, screening of equipment and loading areas and related design considerations.” The project design incorporates several of the strategies included in this General Plan Policy including articulation and segmentation of wall and roof planes, visual openings in the wall plane, appropriate setbacks and hierarchical landscaping. Most of the parking for the project is provided in structured parking that is located underground or on the portion of the site that away from adjacent neighbors. a. Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. The Project will involve the demolition of all the existing buildings on the site and the construction of new buildings. The buildings approved with this Architectural and Site Approval all meet the height restrictions of the General Plan. The structure on the site meet the development regulations for the Master Plan approved for the project. The applicant is retaining existing mature trees along the rear property line shared with residences in the City of Santa Clara. These trees help screen the new buildings from the neighbors. b. In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new buildings should harmonize with adjacent development by being consistent or compatible with design and color schemes, and with the future character of the neighborhood and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments and provide shielding to prevent spillover light to adjoining property owners. The buildings will be visible from the public right-of-way but minimally from the neighboring properties due to the existence of mature trees along the property line. The project proposes to demolish all existing buildings and structures on the site and convert an outmoded business park into a world-class corporate campus with a significant increase in open space and pervious surface. The property values in the adjacent area will be maintained or enhanced due to proximity to this employment center. The walls, fencing, hedges and screen planting have been designed to Draft Resolution ASA-2014-08 November 13, 2014 Page 4 minimize the impacts upon adjacent properties and to be aesthetically pleasing. Storage areas and service buildings will be shielded from view or set sufficiently back from the property line to not be visible. Permeable surface area has been increased greatly on the site in order to increase open space. The destruction of healthy trees has occurred where there are direct conflicts, but will be replaced by more trees than are removed. The lighting for the development has been designed so as to not spill over onto adjacent properties. Mature trees are being retained along the perimeter of the site and several large trees are being planted and others being transplanted to the perimeter of the site to ensure that there is no glare and light from the development. c. The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures shall minimize traffic hazards and shall positively affect the general appearance of the neighborhood and harmonize with adjacent development. The Project approval does not propose any signage and therefore this finding does not apply to this project. However, Apple will file separate signage permits in the future which will be reviewed, in order to minimize impact upon traffic, the general appearance of the neighborhood and harmonize with adjacent development. d. With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. The Project is designed to minimize impacts upon adjacent neighborhoods by the use of tree planting and extensive setbacks to minimize the visibility of the buildings and to ensure that light and glare do not spill onto adjacent development. The parking structure is located at the southern edge of the property and will be minimally visible only from the freeway. Large landscaped buffers are being proposed along the shared property lines while the buildings are setback significantly from residential developments. As described in the EIR, operational noise levels will be minimal due to both the setbacks and the nature of the operations and construction noise will be mitigated through the construction of a temporary soundwall during construction. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set dated October, 2014 consisting of 73 pages labeled Title Page, P-1.10, P-1.21,P-1.30, P-1.40, P-1.20, P-1.50, Site – Masterplan, P-2.20, P-2.21, P-2.30, P-2.31, P-2.40, P-2.41, P-3.00, Site – Civil, P-3.10, P-3.20, P-3.21, P-3.30, P-3.31, P-3.40, P-3.50, Site – Landscape, P-4.00, P-4.09, P-4.10, P-4.15, P-4.16, P4.20, P4.30 - P4.33, P4.40, P4.41, P4.50, P4.60, P4.70, Architecture – Office, P-5.00, P-5.01, P-5.03, P-5.10, P-5.20, P-5.30, Architecture – Testing Facilities, P-6.00, P-6.01, P-6.10, P-6.20, P-6.30, P-7.00, P-7.01, P-7.10, P-7.20, P-7.30, Architecture – Parking Structure, P-8.00 - P-8.03, P-8.10 - P-8.30, Architecture – Visualizations, and P-9.00 - P-9.05, titled “Apple Campus 2 – Phase 2, North Tantau Ave – Sites C + D, Site & Architectural Review, October 2014” prepared by Foster Draft Resolution ASA-2014-08 November 13, 2014 Page 5 + Partners, OLIN, and Luk and Associates, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file nos. GPA-2011-03, Z-2011-03, DP-2011-04, U- 2011-11, ASA-2011-14, TM-2011-03, DA-2011-01, EA-2011-12 and TR-2011-39 shall be applicable to this approval. 4. LANDSCAPE PLAN The final landscaping plan shall be reviewed and approved by the Planning Division prior to issuance of building permits. 5. BICYCLE PARKING The applicant shall provide bicycle parking and bike racks for the proposed project in accordance with the City’s Parking Regulations under Chapter 19.124 of the Cupertino Municipal Code. 6. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 7. EXTERIOR BUILDING MATERIALS/TREATMENTS Final building exterior treatment plan (including but not limited to details on exterior color, material, architectural treatments and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The final building exterior plan shall closely resemble the details shown on the original approved plans. Any exterior changes determined to be substantial by the Director of Community Development shall require a minor modification approval with neighborhood input. 8. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90- day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. Draft Resolution ASA-2014-08 November 13, 2014 Page 6 9. LIGHTING Prior to issuance of the applicable permit for exterior and site lighting for Phase 2A, the applicant shall submit an outdoor lighting photometric plan to the Planning Division for final review and approval. 10. SOUNDWALL SCREENING Prior to issuance of a building permit for Phase 2A, the applicant shall submit revised landscape plans identifying landscape screening of the soundwall along I-280 for review and approval of the Planning Division. 11. PARKING STRUCTURE DESIGN Prior to issuance of a building permit for Phase 2A, the applicant shall submit revised plans for the parking structure eliminating the previously proposed mesh architectural element. The final design of the parking structure shall be subject to review and approval of the Planning Division. 12. PLAN AMENDMENTS Unless specifically reviewed and approved as part of a separate application, any area within the proposed Phase 2A buildings designated as an amenity shall not be converted to a non-amenity use and the addition of a roof element on the satellite plant building shall be prohibited. 13. LANDSCAPE INSTALLATION REPORT The project is subject to all provisions delineated in the Landscape Ordinance (CMC, Chapter 14.15). A landscape installation audit shall be conducted by a certified landscape professional after the landscaping and irrigation system have been installed. The findings of the assessment shall be consolidated into a landscape installation report. The landscape installation report shall include, but is not limited to: inspection to confirm that the landscaping and irrigation system are installed as specified in the landscape and irrigation design plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that causes overland flow, and preparation of an irrigation schedule. The landscape installation report shall include the following statement: “The landscape and irrigation system have been installed as specified in the landscape and irrigation design plan and complies with the criteria of the ordinance and the permit.” 14. LANDSCAPE AND IRRIGATION MAINTENANCE Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be established and submitted to the Director of Community Development or his/her designee, either with the landscape application package, with the landscape installation report, or any time before the landscape installation report is submitted. a) Schedules should take into account water requirements for the plant establishment period and water requirements for established landscapes. b) Maintenance shall include, but not be limited to the following: routine inspection; pressure testing, adjustment and repair of the irrigation system; aerating and de- Draft Resolution ASA-2014-08 November 13, 2014 Page 7 thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of failed plants; weeding; pest control; and removing obstructions to emission devices. c) Failed plants shall be replaced with the same or functionally equivalent plants that may be size-adjusted as appropriate for the stage of growth of the overall installation. Failing plants shall either be replaced or be revived through appropriate adjustments in water, nutrients, pest control or other factors as recommended by a landscaping professional. 15. SOIL ANALYSIS REPORT A soils analysis report shall document the various characteristics of the soil (e.g. texture, infiltration rate, pH, soluble salt content, percent organic matter, etc) and provide recommendations for amendments as appropriate to optimize the productivity and water efficiency of the soil. The soil analysis report shall be made available to the professionals preparing the landscape and irrigation design plans in a timely manner either before or during the design process. A copy of the soils analysis report shall be submitted to the Director of Community Development as part of the landscape documentation package. 16. UTILITY STRUCTURE PLAN Prior to issuance of building permits, the applicant shall work with staff to provide a detailed utility plan to demonstrate screening or undergrounding of all new utility structures [including, but not limited to backflow preventers (BFP), fire department connections (FDC), post-indicator valves (PIV), and gas meters] to the satisfaction of the Director of Community Development, Public Works, Fire Department, and applicable utility agencies. 17. SCREENING All mechanical and other equipment on the building or on the site shall be screened so they are not visible from public street areas or adjoining developments. Screening materials/colors shall match building features and materials. The height of the screening shall be taller than the height of the mechanical equipment that it is designed to screen. The location of equipment and necessary screening shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. 18. INDEMNIFICATION To the extent permitted by law, the Applicant shall indemnify and hold harmless the City, its City Council, its officers, employees and agents (the “indemnified parties”) from and against any claim, action, or proceeding brought by a third party against the indemnified parties and the applicant to attack, set aside, or void this ordinance or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys’ fees and costs incurred in defense of the litigation. The City may, in its sole discretion, elect to defend any such action with attorneys of its choice. Draft Resolution ASA-2014-08 November 13, 2014 Page 8 SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT 19. CONCURRENT APPROVAL CONDITIONS The project shall comply with the conditions of approval required as part of the Apple Campus 2 entitlements and related amendments. SECTION V: CONDITIONS ADMINISTERED BY THE SANTA CLARA COUNTY FIRE DEPARTMENT 20. ACCESS ROADWAYS Fire Department access roadways shall conform to Santa Clara County Fire Department Standards. 21. SECONDARY EMERGENCY ACCESS Secondary emergency access mitigations shall be provided as specified in the letter from Apple Computer dated October 16, 2014. PASSED AND ADOPTED this 13th day of November, 2014 at a Regular Meeting of the Administrative Hearing Meeting of the City of Cupertino, State of California, by the following roll call vote: AYE: HEARING OFFICER: NOE: HEARING OFFICER: ATTEST: APPROVED: Piu Ghosh Gary Chao Senior Planner Assist. Dir. of Community Development ATTACHMENT 2 TR-2014-59 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 DRAFT RESOLUTION OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF CUPERTINO TO ALLOW REFINEMENTS TO A PREVIOUSLY APPROVED MASTER TREE REMOVAL PERMIT (TR-2011-39) FOR APPLE CAMPUS 2 SECTION I: PROJECT DESCRIPTION Application No.: TR-2014-59 Applicant: Wolfgang Wagener (Apple Campus 2) Property Owner: Apple, Inc. Location: Area bounded by East Homestead Road, North Tantau Avenue, I-280, North Wolfe Road including properties located on the east side of North Tantau Avenue (APN Nos. 316-06-033; 316-06-038; 316-06-039; 316-06-045; 316-06-046; 316-06-048; 316-06-049; 316-06-050; 316-06-051; 316-06-052; 316-06-053; 316-07-044; 316-07-045; 316-07-046; 316-09-019; 316-09-027; 316-09-028; 316-18-012; 316-18-025; 316-18-026; 316-18-027; 316-18-035) WHEREAS, based on substantial evidence in the administrative record, on October 15, 2013, the City Council held a public hearing to consider the approval of an office, research and development campus; and WHEREAS, after consideration of evidence contained in the entire administrative record, at the public hearing on October 15, 2013, the City Council adopted Resolution No. 13-082 certifying the EIR, adopting Findings and a Statement of Overriding Considerations, adopting Mitigation Measures, and adopting of a Mitigation Monitoring and Reporting Program; and WHEREAS, the City Council approved an office, research and development campus for Apple Inc. including entitlements for a phased development of the campus which included the development of properties along N. Tantau Avenue in separate phases; and WHEREAS, an application was received by the City (Application ASA-2014-08) for Architectural and Site Approval to allow office, research and development facilities in three buildings, associated parking structure, restaurant and site improvements for Phase 2 of a previously approved office, research and development campus; and Draft Resolution TR-2014-59 November 13, 2014 Page 2 WHEREAS, an application was received by the City (Application No. TR-2014-59) to refine a previously approved Master Tree Removal Permit (TR-2011-39) for an office, research and development campus; and WHEREAS, the Architectural and Site Approval is required for the previously entitled office, research and development buildings with associated parking facilities; and WHEREAS, the Tree Removal Permit is required to allow refinements to the previously approved Tree Removal Permit; and WHEREAS, the necessary public notices have been given as required by the procedural ordinances of the City of Cupertino and the Government Code, and the Administrative Hearing Office held a public meeting on November 13, 2014 in regard to the applications; and NOW, THEREFORE, BE IT RESOLVED: After careful consideration of the, maps, facts, exhibits, testimony and other evidence submitted in this matter, the Administrative Hearing Officer hereby approves Application No. TR-2014-59 based upon the findings described in Section II of this resolution, the administrative record, and subject to the conditions specified in Sections III, IV and V of this resolution. SECTION II: FINDINGS WHEREAS, the Administrative Hearing Officer finds that: 1. The location of the trees restricts the economic enjoyment of the property by severely limiting the use of property in a manner not typically experienced by owners of similarly zoned and situated property, and the applicant has demonstrated to the satisfaction of the approval authority that there are no reasonable alternatives to preserve the tree(s). The applicant is proposing the removal of approximately 4,501 trees, including the relocation of 90 trees within the proposed project. The trees are part of approved landscape design for existing buildings and parking lots. Since the buildings and parking lots will be demolished with this project, the trees would be located in buildable areas. Retention of these landscape trees in their current location would significantly restrict the ability to redevelop the property in a manner that differs from the existing configuration of buildings and parking lots. The removal of these trees is necessary to allow for the development of a project that makes use of the existing site more efficiently. Further, the Project will result in a significant increase in the number of trees, including more native and drought tolerant trees. Under the current application, adjustments are being made to the number of trees being removed on the project, however, the number of trees being removed do not exceed the number of trees studied for removal in the EIR. The majority of the trees along the eastern edge of Site D, adjacent to the existing homes in the City of Santa Clara, are being saved; thereby, ensuring that the existing mature trees will provide adequate buffer from the ongoing construction and provide a mature canopy for the campus upon project construction. However, the removal of 39 additional trees within the areas of Sites C and D is needed as a result of site plan refinements and due to ill health and stress from the drought and lack of irrigation. The removal of these trees are not located adjacent Draft Resolution TR-2014-59 November 13, 2014 Page 3 to the existing homes in the City of Santa Clara. The trees removed will be replaced in accordance with the City’s Protected Tree Ordinance. In addition to the trees that will remain and be transplanted on-site, approximately 780 new trees will be planted as replacement for the trees being removed in accordance with Municipal Code requirements. Details of the tree replacements are provided on Page 4.30 of the plan set referenced in Section III.I of this resolution. Trees planted on site will be considered “protected” per the City’s definition of Protected Trees. The consulting arborist has confirmed that the tree replacement plan proposed by the applicant is consistent with the City’s Protected Tree Ordinance requirements. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set dated October, 2014 consisting of 73 pages labeled Title Page, P-1.10, P-1.21,P-1.30, P-1.40, P-1.20, P-1.50, Site – Masterplan, P-2.20, P-2.21, P-2.30, P-2.31, P-2.40, P-2.41, P-3.00, Site – Civil, P-3.10, P-3.20, P-3.21, P-3.30, P-3.31, P-3.40, P-3.50, Site – Landscape, P-4.00, P-4.09, P-4.10, P-4.15, P-4.16, P4.20, P4.30 - P4.33, P4.40, P4.41, P4.50, P4.60, P4.70, Architecture – Office, P-5.00, P-5.01, P-5.03, P-5.10, P-5.20, P-5.30, Architecture – Testing Facilities, P-6.00, P-6.01, P-6.10, P-6.20, P-6.30, P-7.00, P-7.01, P-7.10, P-7.20, P-7.30, Architecture – Parking Structure, P-8.00 - P-8.03, P-8.10 - P-8.30, Architecture – Visualizations, and P-9.00 - P-9.05, titled “Apple Campus 2 – Phase 2, North Tantau Ave – Sites C + D, Site & Architectural Review, October 2014” prepared by Foster + Partners, OLIN, and Luk and Associates, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file nos. GPA-2011-03, Z-2011-03, DP-2011-04, U- 2011-11, ASA-2011-14, ASA-2014-08, TM-2011-03, DA-2011-01, EA-2011-12 and TR-2011-39 shall be applicable to this approval. 4. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. Draft Resolution TR-2014-59 November 13, 2014 Page 4 5. FINAL PLANTING PLAN The applicant shall plant replacement trees in accordance with the replacement requirements of the Protected Tree Ordinance. The trees shall be planted prior to final occupancy of site permits. The final planting plan shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The Director of Community Development shall have the discretion to require additional tree replacements as deemed necessary. An ISA Certified Arborist shall confirm that the replacement trees were planted properly and according to plan prior to final occupancy. 6. TREE REMOVAL The applicant shall plant replacement trees for the Protected Trees that have been approved for removal as identified in the MMRP (Exhibit DP-1). The applicant shall also transplant trees as identified in the project plans and, if transplantation is not effective, replacements shall be planted as identified in Exhibit DP-1. 7. TREE PROTECTION As part of the demolition or building permit drawings, a tree protection plan shall be prepared by a certified arborist for the trees to be retained. Tree protection measures shall be consistent with the EIR. In addition, the following measures shall be added to the protection plan:  For trees to be retained, chain link or other appropriate fencing and other root protection shall be installed around the dripline of the tree prior to any project site work.  No parking or vehicle traffic shall be allowed over root zones, unless using buffers approved by the Project Arborist.  No trenching within the critical root zone area is allowed. If trenching is needed in the vicinity of trees to be retained, the City’s consulting arborist shall be consulted before any trenching or root cutting beneath the dripline of the tree.  Wood chip mulch shall be evenly spread inside the tree projection fence to a four-inch depth.  Tree protection conditions shall be posted on the tree protection barriers.  Retained trees shall be watered to maintain them in good health. The tree protection measures shall be inspected and approved by the City’s consulting arborist prior to issuance of building permits. The City’s consulting arborist shall inspect the trees to be retained and shall provide monthly updates on the health of the trees retained in place and being transplanted. A report ascertaining the good health of the trees mentioned above shall be provided prior to issuance of final occupancy. 8. TREE PROTECTION BOND The applicant shall provide a tree protection bond in the amount of $1,000,000 to ensure protection of 845 trees to be retained in place and 90 transplant trees on the site prior to Draft Resolution TR-2014-59 November 13, 2014 Page 5 issuance of grading, demolition or building permits. The bond shall be returned after completion of construction, subject to a letter from the City arborist indicating that the trees are in good condition. 9. INDEMNIFICATION To the extent permitted by law, the Applicant shall indemnify and hold harmless the City, its City Council, its officers, employees and agents (the “indemnified parties”) from and against any claim, action, or proceeding brought by a third party against the indemnified parties and the applicant to attack, set aside, or void this ordinance or any permit or approval authorized hereby for the project, including (without limitation) reimbursing the City its actual attorneys’ fees and costs incurred in defense of the litigation. The City may, in its sole discretion, elect to defend any such action with attorneys of its choice. 10. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90- day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT 11. CONCURRENT APPROVAL CONDITIONS The project shall comply with the conditions of approval required as part of the Apple Campus 2 entitlements and related amendments. SECTION V: CONDITIONS ADMINISTERED BY THE SANTA CLARA COUNTY FIRE DEPARTMENT 12. ACCESS ROADWAYS Fire Department access roadways shall conform to Santa Clara County Fire Department Standards. 13. SECONDARY EMERGENCY ACCESS Secondary emergency access mitigations shall be provided as specified in the letter from Apple Computer dated October 16, 2014. Draft Resolution TR-2014-59 November 13, 2014 Page 6 PASSED AND ADOPTED this 13th day of November, 2014 at a Regular Meeting of the Administrative Hearing Meeting of the City of Cupertino, State of California, by the following roll call vote: AYE: HEARING OFFICER: NOE: HEARING OFFICER: ATTEST: APPROVED: Piu Ghosh Gary Chao Senior Planner Assist. Dir. of Community Development 11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) LSA ASSOCIATES, INC. 2215 FIFTH STREET BERKELEY, CALIFORNIA 94710 510.540.7331 TEL 510.540.7344 FAX CARLSBAD FRESNO IRVINE PALM SPRINGS PT. RICHMOND RIVERSIDE ROCKLIN SAN LUIS OBISPO MEMORANDUM DATE:DATE:DATE:DATE: November 4, 2014 TO:TO:TO:TO: Piu Ghosh, AICP, City of Cupertino FROM:FROM:FROM:FROM: Judith Malamut, AICP, Principal, LSA Associates, Inc. Kelly Bray, Planner, LSA Associates, Inc. SUBJECT:SUBJECT:SUBJECT:SUBJECT: Third Addendum to the Apple Campus 2 Project Final Environmental Impact Report (EIR), State Clearinghouse # 2011082055 This memorandum, prepared pursuant to the California Environmental Quality Act (CEQA), is a Third Addendum to the certified Apple Campus 2 Project Final EIR.1,2 A previous, first Addendum to the Final EIR was adopted by the City on April 9, 2014, in connection with the City’s approval of minor modifications to the dimensions, geometry and footprint of several site buildings, a reduction of parking spaces, and the addition of a Security Operations Center. A Second Addendum to the Final EIR was adopted by the City in September 2014 in connection with the approval of minor modifications to the Corporate Auditorium, Corporate Fitness Center, and Central Plant Equipment Yard. This Third Addendum evaluates proposed modifications to Apple Campus 2 Phase 2 North Tantau Avenue Sites C and D portion of the project that were included in the Site and Architectural Review Application submitted to the City of Cupertino (City) by Apple Inc. (project sponsor) in October 2014.3,4 The project applicant is requesting Architectural and Site approval and a Tree Removal Permit for the Phase 2, Sites C and D portions of Apple’s previously approved office, research and development campus. In general, the applications request minor changes to the approved amount, type and location of the Phase 2 development and tree removal and replacement. In addition, the locations and number of buildings have changed as has the parking configuration. Rather than being spread out over Sites C and D or in underground garages, as previously proposed, the majority of parking would now be housed in one aboveground parking structure. The number of parking spaces would remain the same as previously approved, however. As discussed in this Third Addendum, the proposed minor modifications to this Phase 2 portion of the project would not result in significant environmental effects beyond those identified in the Final EIR. 1 LSA Associates, Inc., 2014. Addendum to the Apple Campus 2 Project Final Environmental Impact Report. April 4. 2 LSA Associates, Inc., 2014. Second Addendum to the Apple Campus 2 Project Final Environmental Impact Report. September 15. 3 Foster and Partners, 2014. Apple Campus 2 – Phase 2, North Tantau Avenue Sites C + D Site & Architectural Review. June, revised and submitted October 2014. 4 The text on page 139 of Volume 1 of the EIR, i.e., the Draft EIR, mistakenly stated that Phase 2 of the approved project would require a Development Permit. Pursuant to the City’s Municipal Code, a Site and Architectural Permit is required, and a Development Permit is not required. 11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 2 LSA ASSOCIATES, INC. The Final EIR,5 which was certified on October 15, 2013, evaluates the environmental impacts of development of a new campus for Apple on a 176-acre site bordered generally by East Homestead Road on the north, North Tantau Avenue on the east, Interstate 280 (I-280) and The Hamptons apartments on the south, and North Wolfe Road on the west. The project would result in the demolition of all existing structures within the project site and the construction of 3,420,000 square feet of office, research, and development uses; 245,000 square feet of auditorium, fitness center, and valet parking reception uses; 92,000 square feet of utility plants; and parking and ancillary buildings. Significant environmental impacts would result in the following topical areas: Planning Policy; Land Use; Biological Resources; Cultural Resources; Geology, Soils, and Seismicity; Hydrology and Water Quality; Hazards and Hazardous Materials; Transportation and Circulation; Noise; Air Quality; and Public Services and Utilities. This Third Addendum is prepared pursuant to CEQA Guidelines Section 15164 which states: “The lead agency or a responsible agency shall prepare an addendum to a previously certified EIR if some changes or additions are necessary, but none of the conditions described in Section 15162 calling for preparation of a subsequent EIR have occurred.” Section 15162 specifies that “no subsequent EIR shall be prepared for that project unless the lead agency determines … one or more of the following”: 1. Substantial changes are proposed in the project which would require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; 2. Substantial changes occur with respect to the circumstances under which the project is under- taken which would require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or 3. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete was adopted, shows any of the following: (A) The project would have one or more significant effects not discussed in the previous EIR; (B) Significant effects previously examined would be substantially more severe than shown in the previous EIR; (C) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or (D) Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environ- ment, but the project proponents decline to adopt the mitigation measure or alternative. Pursuant to CEQA Guidelines Section 15164(e), the following discussion summarizes the minor modifications proposed as part of the Phase 2 North Tantau Avenue Sites C and D Application submitted on September 11, 2014, the less-than-significant impacts associated with the proposed minor modifications, and the reasons for the City’s conclusion that changes to the proposed project 5 LSA Associates, Inc., 2013. Apple Campus 2 Project Final EIR (State Clearinghouse No. 2011082055). October. 11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 3 LSA ASSOCIATES, INC. (and associated environmental effects) do not meet the conditions described in Sections 15162 and 15163 calling for preparation of a Subsequent EIR or a Supplement to an EIR. A. MINOR MODIFICATIONS TO THE PROJECT The following provides a summary of the approved Phase 2 development of Sites C and D evaluated in the Final EIR and a description of the proposed modifications to Phase 2 development 1. Approved Phase 2 Development The Phase 2 North Tantau Avenue Sites C and D Application identifies proposed changes to the portion of Phase 2 development which is located south of Calabazas Creek, and east and west of North Tantau Avenue. This portion of Phase 2 was previously described in the Final EIR as office, research and development Buildings 4 through 13, as shown on Figure 1. The remaining portion of the Phase 2 development area (buildings 1 through 3), that is not being considered in this Addendum, is identified as Site B and is located to the east of North Tantau Avenue and north of Calabazas Creek, as shown on Figure 2. The Final EIR approved up to four, four-story office, research and development buildings west of North Tantau Avenue on Site D, and this approval granted development of up to 300,000 square feet of building space. Also approved were up to six, three-story office, research and development buildings east of North Tantau Avenue on Site C. This approval granted development of up to 225,000 square feet of building space. For Sites C and D, up to 1,140 below-grade and surface parking spaces were also approved for an anticipated 1,400 employees, as shown on Figure 2. 2. Minor Modifications to Phase 2 Development The proposed development, evaluated in this Addendum, would reconfigure the 10 buildings approved for Sites C and D under the Final EIR, into five buildings as shown on Figure 3 and described below. Other proposed site improvements include a parking structure access ramp, surface parking lots, four on-campus Apple Shuttle stops, bicycle parking, and pedestrian paths. Site D would consist of a four-story office building with an attached 300-seat employee cafeteria, and an approximately 100-seat outdoor terrace with food kiosk. The building would replace the existing buildings and surface parking lots on the site which include a two-story, 103,047-square-foot office building at 10435 North Tantau Avenue, and a single-story, 9,000-square-foot temporary building south of the main building that the project proponent has been utilizing for materials testing. The new building would provide approximately 288,050 square feet of office use and 15,950 square feet of restaurant use. The building would also include 280 below-grade parking spaces and 83 surface parking stalls, an on-campus Apple Shuttle bus stop on the east side of the building, and employee bicycle parking on the west side of the building. The maximum building height would be 60 feet, not including the screens placed around the mechanical equipment on the roof of the building, which are approximately 12 feet tall as shown on Figure 4. Site C would consist of two, two-story research and development buildings, a five-story parking garage, and a single-story satellite plant and mechanical yard, located to the south of the parking structure. The buildings would replace the existing buildings and surface parking lots on the site which include one two-story (40 feet tall), 100,650 square foot office building at 10300 North Tantau Avenue and one single-story (22 feet tall), 45,740 square foot office building at 10400 North Tantau 11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 4 LSA ASSOCIATES, INC. Avenue. On Site C, the proposed northern research and development building would be approxi- mately 70,000 square feet and 36 feet in height, and the proposed south research and development building would be approximately 142,000 square feet and 36 feet in height. The buildings would also include 158 surface parking spaces, three on-campus Apple Shuttle bus stops on the east side of the buildings, and employee bicycle parking on the west side of the buildings. The proposed parking structure building would consist of approximately 320,000 square feet and 620 parking spaces. The garage would occupy a portion of the property where an existing two-story office building is currently located on the site at 10300 North Tantau Avenue. A 32,000-square-foot data center is proposed to be housed on the below-grade Level B1 in the parking structure. Above-grade Levels 1 through 5 would provide structured parking, and the roof would provide support for photovoltaic panels. The proposed maximum building height would be 57 feet and 6 inches, including the photovoltaic panels. Additionally, an elevator “overrun” would be located on the roof and would be at an elevation of 65 feet and 6 inches. Because the overrun contains and screens mechanical equipment, the City allows this type of use to exceed the maximum building height. The site plan for the satellite plant and mechanical yard is shown in Figure 5. As shown and described on page 88 of the Final EIR, equipment at the satellite plant would house similar mechanical and electrical equipment to that housed at the Central Plan (including transformers and emergency generators). While the Satellite Plant South was expected to be approximately 30,000 square feet in size and up to 15 feet in height (page 88 of the Final EIR), as currently proposed, the Satellite Plant South would now include only approximately 5,000 square feet of accessory building uses. 3. Description of Minor Modifications to Phase 2 Development For Sites C and D, the Final EIR approved a total of 525,000 square feet of building space, 400,000 square feet of accessory parking, 1,140 parking stalls, and a satellite plant use (see Table 1). The modified proposed project for Sites C and D, would construct 516,000 square feet of building space, and 462,000 square feet of parking structure (considered an accessory use) and a data center space. While the amount of building square footage to house parking would be increased, there would be a beneficial reduction in excavation and off-haul of materials, as well as an increase in landscaped area. Of the proposed 516,000 square feet of proposed building space, the amount of space dedicated to office uses has increased from the previously approved plans from 280,000 square feet to 288,050 square feet; the amount of space dedicated to restaurant facilities has decreased from 20,000 square feet to 15,950 square feet; and the amount of research and development uses has decreased from 225,000 square feet to 212,000 square feet. Of the proposed 462,000 square feet of accessory space, the amount of below-grade parking in previously approved plans has decreased from 336,000 square feet to 110,000 square feet; the amount of above grade structured parking has increased from 0 square feet to 320,000 square feet; the 32,000- square-foot satellite plant has been reduced to 5,000 square feet; and a 32,000-square-foot data center is now proposed for the basement level of the parking garage. The proposed total site area remains unchanged from previously approved plans at 15.83 acres; however, the amount of hardscape would decrease from 79 percent of the site to 68 percent of the Phase 2 Sites C and D area. The amount of excavation would also decrease from 160,000 cubic yards to 110,000 cubic yards, and the amount of off-haul would decrease from 150,000 cubic yards to 90,000 cubic yards. 7 NORTH TANTAU AVENUE 11 12 1310 fe e t 50 25 0 SO U R C E : AP P L E , 2 0 1 4 . I: \ C O C 1 3 0 1 A p p l e C a m p u s 2 \f i g u r e s \ A d d e n d u m 3 \ F i g _ 1 1 1 x 1 7 . a i ( 1 1 / 3 / 1 4 ) FIGURE 1 Apple Campus 2 Project EIR Third Addendum Previously Approved Phase 2 Sites C and D 11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 6 LSA ASSOCIATES, INC. This page intentionally left blank. Si t e C North no t t o s c a l e FIGURE 2 SO U R C E : A P P L E , J U N E 2 0 1 4 . I: \ C O C 1 3 0 1 A p p l e C a m p u s 2 \f i g u r e s \ A d d e n d u m 3 \ F i g _ 2 . a i ( 9 / 1 8 / 1 4 ) Ap p l e C a m p u s 2 P r o j e c t E I R T h i r d A d d e n d u m Pr o p o s e d P h a s e 2 Plan and Master Plan 11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 8 LSA ASSOCIATES, INC. This page intentionally left blank. NORTH TANTAU AVENUE Si t e D Si t e C Si t e C Si t e C no t t o s c a l e SO U R C E : AP P L E , 2 0 1 4 . I: \ C O C 1 3 0 1 A p p l e C a m p u s 2 \f i g u r e s \ A d d e n d u m 3 \ F i g _ 3 1 1 x 1 7 . a i ( 1 1 / 3 / 1 4 ) FIGURE 3 Apple Campus 2 Project EIR Third Addendum Proposed Phase 2 Sites C and D Site Plan 11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 10 LSA ASSOCIATES, INC. This page intentionally left blank. R & D N o r t h SI T E D SI T E D SI T E C ME C H A N I C A L S C R E E N I N G SI T E D R & D S o u t h Pa r k i n g S t r u c t u r e Ty p i c a l S e c t i o n D e t a i l Of f i c e B u i l d i n g no t t o s c a l e FIGURE 4 SO U R C E : A P P L E , J U N E 2 0 1 4 . I: \ C O C 1 3 0 1 A p p l e C a m p u s 2 \f i g u r e s \ A d d e n d u m 3 \ F i g _ 4 . a i ( 9 / 1 8 / 1 4 ) Ap p l e C a m p u s 2 P r o j e c t E I R T h i r d A d d e n d u m Pr o p o s e d P h a s e 2 S i t e s C a n d D T y p i c a l S e c t i o n s no t t o s c a l e FIGURE 5 SO U R C E : A P P L E , S E P T E M B E R 2 0 1 4 . I: \ C O C 1 3 0 1 A p p l e C a m p u s 2\ f i g u r e s \ A d d e n d u m 3 \ F i g _ 5 . a i ( 1 1 / 3 / 1 4 ) Ap p l e C a m p u s 2 P r o j e c t E I R T h i r d A d d e n d u m Pr o p o s e d P a r k i n g G a r a g e a n d S a t e l l i t e P l a n t 11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 13 LSA ASSOCIATES, INC. The proposed 1,400 employees expected to occupy Sites C and D remains unchanged from previously approved plans. Similarly, the 1,140 proposed parking stalls remains unchanged from previously approved plans; however, the configuration has changed due to the construction of the parking garage. The proposed number of surface parking spaces has increased from 300 stalls to 861 stalls, but the number of below-grade parking spaces has decreased from 840 stalls to 279 stalls. Another minor change is that fire access to the property would be provided from a signalized intersection on North Tantau Avenue, with secondary fire access being provided via a staircase from North Tantau Avenue close to the I-280 freeway overpass near the parking structure. The proposed fire access has been reviewed and approved by the Santa Clara County Fire Department which provides fire services for the City of Cupertino. Additionally, the Final EIR evaluated and allowed the removal of 3,620 trees from the entire development area. The proposed modifications would not require the removal of more trees than is currently allowed. However, with proposed changes to the site plan and to distribution of the buildings, there are some changes to which trees would be removed (some due to ill health and stress from the drought and lack of irrigation). The changes to the tree removal plans were reviewed by the City’s consulting arborist, Michael Bench, who prepared a brief memo that concurred with and recommended approval of the proposed tree removal plan.6 4.Summary of Less-Than-Significant Impacts The following provides a short discussion of the less-than-significant environmental impacts associated with the proposed design modifications to Phase 2. a.Aesthetics. The design modifications to Sites C and D would not result in environmental impacts beyond those already identified in the Final EIR. The Final EIR evaluated the impacts of four, three- to four-story buildings (up to 60 feet tall) on Site D, and six, two- to three-story buildings (up to 60 feet tall) on Site C. The proposed project modifications would result in the development of buildings of similar height: one, four-story office building (60 feet tall) on Site D, and two, two-story buildings (36 feet tall), a five-story parking garage (60 feet tall), and a single-story satellite plant on Site C (see Figure 5). The Final EIR evaluated the impacts of 525,000 square feet of development for 6 Bench, Michael, Consulting Arborist. 2014. A Review of Trees Proposed for Removal, Apple Campus 2, Phase 2, Cupertino California, Memorandum. March 25. Table 1: Summary of Proposed Changes to Phase 2 Sites C and D Development Site Information Approved Development Proposed Development Total Site Area (acres) 15.83 15.83 Hardscape 12.48 10.77 Softscape 3.35 5.06 Employees 1,400 1,400 Parking Surface Stalls 300 861 Below-Grade Stalls 840 279 Total Parking Stalls 1,140 1,140 Excavation (cubic yards) 160,000 110,000 Off-Haul (cubic yards) 150,000 90,000 Building Information (sq/ft) Approved Development Proposed Development Total Building Area 525,000 516,000 Office 280,000 288,050 Restaurant 20,000 15,950 North Research Facilities 225,000 70,000 South Research Facilities 0 142,000 Total Unoccupied Area 400,000 467,000 Parking Below-Grade 336,000 110,000 Parking Structure 0 320,000 Satellite Plant South 32,000 5,000 Data Center 32,000 32,000 Total Development Area 925,000 983,000 Source: Foster and Partners, 2014. 11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 14 LSA ASSOCIATES, INC. Sites C and D, and the design modifications would result in a reduced development footprint of 516,000 square feet. The Final EIR evaluated the following accessory uses: 336,000 square feet of below-grade parking, and a 32,000-square-foot Satellite Plant. The accessory use development totaled 400,000 square feet. The proposed design modifications would result in the following accessory uses: 100,000 square feet of below-grade parking, a 320,000-square-foot parking structure, a 32,000-square-foot data center, and a 5,000-square-foot satellite plant. The Final EIR evaluated the impacts of 400,000 square feet of development for Sites C and D, and the design modifications would result in an increased develop- ment footprint to 462,000 square feet. As described above, the design modifications would result in a reduction of impervious area from 12.48 acres to 10.77 acres and a reduction of 60,000 square feet of material to be excavated and off haul from the site. The increase in total square footage for accessory uses is related to the addition of the parking garage. The design modifications would not result in new or more significant impacts to scenic views. The Final EIR determined that scenic views of the Santa Cruz Mountains from nearby residential uses and Jenny Strand Park (east of the site), are blocked by existing three-story buildings and mature trees that line the existing project boundary. The newly configured north and south research and development buildings would be constructed at a maximum building height of 36 feet, which is no taller than the currently existing buildings, and is shorter than the previously approved development. Even with the addition of 12-foot-tall mechanical screens, the buildings would not block views to a degree greater than the approved development of buildings up to 60 feet tall. The parking garage building would be approximately 60 feet tall including the 8-foot-tall photo voltaic cells, which is taller than the existing building that it would replace, but not taller than the approved development and would not significantly block views from streets or residential areas. The reconfiguration of building space from ten separate buildings with smaller footprints to four buildings with a similar total footprints and an increase in building height, would not significantly change the visual character of the area or result in other design-related adverse aesthetic impacts beyond those which were identified in the Final EIR. In the office building, the proposed project would increase office use, and decrease indoor restaurant use. The programming of the outdoor spaces associated with the office building on the west side of North Tantau Avenue would be modified due to the addition of a 100-seat outdoor terrace that would be located adjacent to the restaurant on the north side of the building. This new feature would not result in any new aesthetic changes, as this part of the campus is setback from North Tantau Avenue and screened from public view through the use of berms and landscaping. b. Biological Resources. The design modifications to Sites C and D would not result in environmental impacts beyond those already identified in the Final EIR. The consolidation of buildings would result in a net reduction in impervious surface from 12.48 acres to 10.77 acres, and an increase of approximately 1.5 acres of landscaped areas. The Final EIR evaluated the impacts of the removal of 3,620 trees (see page 265 of the Apple Campus 2 Project Draft EIR). The design modifications to Sites C and D would require the removal of 263 trees (fewer trees than originally proposed), and the transplanting of 6 trees (see Figure 6). Therefore, the impacts due to the removal of trees associated with the proposed design modifications are not new or more significant than those analyzed in the Final EIR. The revised landscape plan utilizes native trees and shrubs, and proposes to plant 780 new trees on Sites C and D. The replacement trees proposed to be planted are consistent with the prior project approval and requirements of the Final EIR. no t t o s c a l e SO U R C E : AP P L E , 2 0 1 4 . I: \ C O C 1 3 0 1 A p p l e C a m p u s 2 \f i g u r e s \ A d d e n d u m 3 \ F i g _ 6 1 1 x 1 7 . a i ( 1 1 / 3 / 1 4 ) FIGURE 6 Apple Campus 2 Project EIR Third Addendum Proposed Tree Disposition Plan for Phase 2 11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 16 LSA ASSOCIATES, INC. This page intentionally left blank. 11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 17 LSA ASSOCIATES, INC. c. Greenhouse Gas Emissions. The design modifications to Sites C and D would not result in environmental impacts beyond those already identified in the Final EIR. Due to design modifications, the amount of site excavation would decrease from 160,000 cubic yards to 110,000 cubic yards, and the amount of off-haul would decrease from 150,000 cubic yards to 90,000 cubic yards. The decrease in excavation and off-haul would reduce less-than-significant impacts related to construction activities, such as site preparation, site grading, on-site heavy-duty construction vehicles, and equipment hauling materials to and from the site. The operation of the proposed project would not create any new or more significant impacts due to the design modifications. Services and facilities would be concentrated on one campus, reducing vehicle trips among dispersed Apple buildings. The proposed office building and research and development buildings would be built to achieve LEED Silver at a minimum, as indicated in the Final EIR. There are no additional parking spaces proposed with the design modifications, therefore no new incentive to drive. The design modifications do not propose additional employees, therefore no new users of electricity and water. Apple Shuttle Stops, bicycle parking, and pedestrian paths have been integrated into the site design as indicated in the TDM program. Photovoltaic cells would be installed on the roof of the parking garage, as part of the effort to achieve zero net energy (consistent with AB 900). Pervious surface has been increased from 3.35 acres to 5.06 acres, which would decrease the reflective surfaces and heat island effect of the campus, further reducing emissions. d. Noise. The design modifications to Sites C and D would not result in environmental impacts beyond those already identified in the Final EIR. The Final EIR evaluated noise impacts for sensitive receptors closest to the Phase 2 construction area including residential uses and users of Jenny Strand Park east of North Tantau Avenue. The design modifications do not propose new land uses that would create new stationary or operational noise impacts and construction and operational noise levels would continue to be acceptable due to the provision of adequate separation distance between the residential neighborhoods and Sites C and D uses. The proposed parking garage would not result in a significant impact to sensitive receptors because the closest receptors are more than 50 feet away and noise from the parking structure would attenuate over that distance, resulting in a less-than-significant impact. Additionally, the incorporation into the design of noise-insulating design features such as walls and louvres, and sound attenuation devices to mitigate operational noise impacts and a temporary sound wall, to mitigate construction noise impacts that would be installed between the project site and the sensitive receptors would further reduce the already less-than-significant noise impacts. e. Population, Employment, Housing. The design modifications to Sites C and D would not result in environmental impacts beyond those already identified in the Final EIR. The Final EIR approved up to 1,400 employees at Phase 2 Sites C and D, and the proposed development is consistent with this number of employees. f. Transportation and Circulation. The design modifications to Sites C and D would not result in environmental impacts beyond those already identified in the Final EIR. The Final EIR evaluated the impacts of vehicle access for Phase 2 at North Tantau Avenue, south of Calabazas Creek and three driveways east of North Tantau Avenue. There are no changes to the vehicle circulation of Sites C and D, therefore, there would be no new impacts to fire access for Sites C and D. The modified site design includes four new on-campus Apple Shuttle stops on the east side of the office building, and both research and development buildings. Plans also include the provision of bicycle parking spaces 11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 18 LSA ASSOCIATES, INC. and pedestrian walkways throughout the project area, which is consistent with the findings of the Final EIR as recommended in the TDM program. The Final EIR evaluated a total of 1,140 parking spaces in Phase 2 Sites C and D, including 840 below-grade spaces and 300 surface spaces. The currently proposed project provides 1,140 parking spaces, including 861 surface spaces and 279 below-grade spaces. This represents an increase in above-grade spaces, and a decrease in below-grade spaces, and is largely due in part to the addition of the five-story parking garage. The reconfiguration of surface parking spaces in the structured parking area would not affect traffic flows or queuing because the new structure is located at the southernmost project boundary, and would not be open to public use, nor is it adjacent to public streets. The proposed project modifica- tions did not increase the number of parking spaces, and therefore would not incentivize driving such that traffic volumes generated by the project would increase. Similarly, the design modification does not decrease the number of parking spaces such that it would cause a shortage of parking, or over- flows into the neighborhood. The parking structure would be above-grade, but would not create new or more significant impacts than were identified in the Final EIR because it remains below the maximum approved building height. B. COMPARISON TO THE CONDITIONS LISTED IN CEQA GUIDELINES SECTIONS 15162 AND 15163 The following discussion summarizes the reasons that a Subsequent EIR, pursuant to CEQA Guidelines Sections 15162 and 15163, is not required to evaluate the environmental effects of the currently-proposed project. 1. Substantial Changes to the Project For the reasons stated above, the proposed minor modifications to the project would not result in new significant environmental impacts beyond those identified in the Final EIR, would not substantially increase the severity of impacts identified in the Final EIR, and thus would not require major revisions to the Final EIR. Therefore, the proposed changes to the project would be minor refinements, not substantial changes, and an Addendum is the appropriate document to address these minor modifica- tions rather than a Subsequent EIR or a Supplement to the Final EIR. 2. Substantial Changes in Circumstances Construction of the project is underway. Environmental conditions in and around the project site have not changed such that implementation of the proposed minor modifications to the project would result in new significant environmental effects or a substantial increase in the severity of environmental effects identified in the Final EIR, and thus would not require major revisions to the Final EIR. 3. New Information No new information of substantial importance, which was not known and could not have been known when the Final EIR was certified, has been identified which shows that the proposed minor modifica- tions to the project would be expected to result in: 1) new significant environmental effects not identified in the Final EIR; 2) substantially more severe environmental effects than shown in the Final EIR; 3) mitigation measures or alternatives previously determined to be infeasible would in fact be 11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 19 LSA ASSOCIATES, INC. feasible and would substantially reduce one or more significant effects of the project, but the project sponsor declines to adopt the mitigation measure or alternative; or 4) mitigation measures or alterna- tives which are considerably different from those identified in the Final EIR would substantially reduce one or more significant effects of the project but the project sponsor declines to adopt the mitigation measure or alternative. In addition, as stated above in Parts B.1 and B.2, the proposed minor modifications to the project would require no new mitigation measures because no new or substantially more severe impacts are expected beyond those identified in the Final EIR. Existing regulations (including City of Cupertino General Plan policies and Zoning Ordinance regulations) and mitigation measures adopted and made conditions of project approval would continue to apply. C. CONCLUSION The proposed minor modifications to the Apple Campus 2 Project Phase 2 buildings described in this Third Addendum, would not require major revisions to the Final EIR due to new or substantially increased significant environmental effects. There have been no substantial changes with respect to the circumstances under which these minor modifications would be undertaken that would require major revisions of the Final EIR due to new or substantially increased significant environmental effects, and there has been no discovery of new information of substantial importance that would trigger or require major revisions to the Final EIR due to new or substantially increased significant environmental effects. Therefore, no subsequent or supplemental EIR is required prior to approval of the minor modifications to the Phase 2 buildings, components of the Apple Campus 2 Project, as described in this Third Addendum. 11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 20 LSA ASSOCIATES, INC. This page intentionally left blank. Apple Campus 2, Phase 2 Cupertino, California Prepared by Michael L. Bench, Site Observations: Consulting Arborist March 25, 2014 1 Michael L. Bench Consulting Arborist (831) 594-5151 7327 Langley Canyon Road Prunedale, California 93907 A Review of Trees Proposed for Removal Apple Campus 2, Phase II Cupertino, California Assignment I was asked by Gary Chao, Planner, City of Cupertino, to review the request to prepare a report regarding a preliminary meeting, which I had with the Apple staff to review the trees on both sides of Tantau Drive near the 280 Freeway, Cupertino, California. Observations The meeting was held on March 25, 2014. The Apple staff Meg Thomas and Dave Muffly were in attendance. There was also a Landscape Architect and an Engineer attending, but I did not make note of their names, which I have since forgotten. We reviewed the trees along the east side property boundary, the trees along the south property boundary adjacent to the 280 Freeway, and the trees around the buildings and the parking lots at the properties on both sides of Tantau Avenue adjacent to the 280 Freeway. The irrigation had become non-functional or had been turned off to the trees along the property boundaries. This included the trees along the East side property boundary and the trees along the south side property boundary adjacent to the 280 Freeway. All of the trees in those areas were suffering from drought stress and many have declined in the past few years. During the meeting I noted the condition of many of the trees by number. For this report, I compared my notes to the assessments by David Babby in 2008 and by Walter Levinson in 2011. Almost without exception, the individual trees in those areas have declined, as a result of no irrigation. The Additional Trees proposed for removal referred to as Phase II are all located in this southeast area of the overall site adjacent to the 280 Freeway. Attached is a comparison between the condition of these trees in 2008/2011 and now. Without irrigation, virtually all trees have declined. This is not surprising considering the moisture needs of the species involved. Apple Campus 2, Phase 2 Cupertino, California Prepared by Michael L. Bench, Site Observations: Consulting Arborist March 25, 2014 2 The irrigation still functions for those trees adjacent to Tantau Avenue on the East side parking lot. On the other hand, the irrigation to most of the trees in the parking lot on the West side of Tantau Avenue is not functioning. The condition of the trees in the non- irrigated areas is poor. Unfortunately the planting plan of the original buildings in these areas used several species that require regular irrigation to perform. In those areas where the irrigation has not functioned, the species requiring regular irrigation have all declined without exception. The worst specimens are included on the attached list of trees to be removed and replaced. There are six trees planned to be planted in the Phase II area. These are: European olive Tree # 5260 European olive Tree # 5263 Coast redwood Tree # 5153 Coast redwood Tree # 5186 Coast redwood Tree # 5187 Coast redwood Tree # 5188 Replacement Trees Planned Among the tree planned for replacement are 315 evergreen and deciduous oak trees. Once established, these trees will require minimal irrigation. Both sides of Calaveras Creek for 50 feet from the top of the bank will be planted with indigenous species only. Large and small indigenous shrubs are planned to be mixed with the oak replacement trees. Conclusions In my opinion, the proposed plan is well designed in terms of appropriate plants capable of long term sustainability, and in terms of water conservation. Recommendations Based on my observations and conclusions, I recommend that the Phase II Plan be approved. Respectfully submitted, Michael L. Bench, Consulting Arborist International Society of Arboriculture Certification # WE 1897A American Society of Consulting Arborists Member Apple Campus 2 Phase II List of Trees Near or Adjacent to 280 Freeway Cupertino, California Prepared by Michael Bench, Consulting Arborist Site Observations: March 25, 2014 Field Data Sheet Trunk Diameter In Inches As Reviewed By David Babby 2008 or Walter Levinson 2011 Reviewed by Michael Bench 3/25/14 DBH = Diameter at Breast Height = 54 inches Above Grade Tree Name DBH Condition Condition Notes 4913 Red Box or Silver Dollar Gum 15/9/6/4/4/ 4 Fair Poor Stump Sprout 4914 Red Box or Silver Dollar Gum 10/9/5 Fair Poor Stump Sprout 4916 Shamel Ash (Fraxinus uhdei) 8/5 Poor Poor 4918 Red Box or Silver Dollar Gum 25 Fair Poor 4920 Shamel Ash 17 Fair Extremely Poor 4922 Shamel Ash 10 Fair Poor 4923 Shamel Ash 13 Poor Poor 4924 Shamel Ash 6/3/3 Poor Extremely Poor 4925 Shamel Ash 12/11/7/6/5 Poor Extremely Poor Stump Sprout 4833 Shamel Ash 6/5/2/2 Poor Extremely Poor 4935 Shamel Ash 22 Fair Poor 4936 Bottlebrush 13 Good Fair 4838 Shamel Ash 13 Fair Poor 4939 Shamel Ash 16 Fair Poor 4940 Shamel Ash 10 Good Fair 4941 Shamel Ash 11 Good Fair 4952 Shamel Ash 12 Poor Extremely Poor 4944 Shamel Ash 12 Good Poor 4845 Shamel Ash 12 Good Fair 4846 Shamel Ash 8 Fair Poor 4947 Shamel Ash 17 Fair Poor 4948 Shamel Ash 10 Fair Extremely Poor 4949 Shamel Ash 11 Good Poor 4950 Shamel Ash 8 Fair Poor 4951 Shamel Ash 10 Fair Poor 4952 Shamel Ash 9 Poor Extremely Poor 4953 Shamel Ash 24 Fair Poor 5174 Shiny Xylosma (Xylosma congestum) 8 Good Fair 5175 Monterey Pine (Pinus radiata) 31 Fair Poor 5176 Monterey Pine 30 Fair Poor 5182 Coast Redwood (Sequoia sempervirens) 11 Fair Fair 5183 Coast Redwood 21 Poor Extremely Poor Very Sparse Canopy 5189 Coast Redwood 27 Poor Extremely Poor Very Sparse Canopy 5191 American Sweet Gum (Liquidambar styraciflua) 7 Fair Poor 5192 Coast Redwood 13 Poor Extremely Poor Very Sparse Canopy 5193 American Sweet Gum 6 Fair Extremely Poor 5195 Coast Redwood 37 Poor Extremely Poor Very Sparse Canopy 5196 Persimmon (Diospyros americana) 5 Poor Poor 5197 Shamel Ash 17 Fair Poor