HomeMy WebLinkAboutAH Packet 11-13-14
City of Cupertino
10300 Torre Avenue, Cupertino, California 95014 (408) 777-3308
ADMINISTRATIVE HEARING AGENDA
Conference Room C
Thursday, November 13, 2014, 5:00 p.m.
ORDER OF BUSINESS:
ROLL CALL
APPROVAL OF MINUTES
October 9, 2014
WRITTEN COMMUNICATIONS
None
ORAL COMMUNICATIONS
(Reserved for persons wishing to address the Hearing Officer on issues that are not already included on the
regular Order of Business)
ITEMS:
1. Application No.(s): ASA-2014-08, TR-2014-59 (EA-2011-12)
Applicant: Wolfgang Wagener (Apple Campus 2)
Location: properties located east and west of N Tantau bounded by Calabasas
Creek to the north and west, City of Santa Clara limits to the east and
I-280 to the south
Architectural and Site approval to review office, research and development facilities in three
buildings, associated parking structure, restaurant and site improvements for Phase 2 of a
previously approved office, research and development campus;
Tree Removal Permit to refine a previously approved Master Tree Removal Permit (TR-2011-39)
for an office, research and development campus
Administrative Hearing decision is final unless appealed
ACTION TO BE TAKEN:
Approve or deny ASA-2014-08
Approve or deny TR-2014-59
ADJOURNMENT
If you challenge the action of the Hearing Officer at the Administrative Hearing in court, you may be
limited to raising only those issues you or someone else raised at the public meeting described in this
notice, or in written correspondence delivered to the City of Cuper tino at, or prior to, the meeting.
Please note that the policy for oral communication is to allow an applicant and groups to speak for 10
minutes and individuals to speak for 3 minutes. In the event an action taken by the Hearing Officer is
deemed objectionable, the matter may be officially appealed to the Planning Commission in writing
within fourteen (14) days of the date of the Hearing Officer’s decision. Said appeal is filed with the City
Clerk (Ordinance 632)
Page 3 Administrative Hearing Committee October 23, 2014
In compliance with the Americans with Disabilities Act (ADA), the City of Cupertino will make
reasonable efforts to accommodate persons with qualified disabilities. If you require special assistance,
please contact the city clerk’s office at 408-777-3223 at least 48 hours in advance of the meeting.
Administrative Hearing
October 9, 2014
Cupertino, CA 95014
(408) 777-3308
ACTION MINUTES OF THE REGULAR MEETING OF
THE ADMINISTRATIVE HEARING HELD ON October 9, 2014
ROLL CALL
Hearing Officer present: Gary Chao, Assist. Director of Community Development
Staff present: Colin Jung
Applicant(s) present: Kevin Chiang (Home of Christ Church)
APPROVAL OF MINUTES:
June 26, 2014
The minutes of June 26, 2014 were approved as written
WRITTEN COMMUNICATIONS:
None
POSTPONEMENTS/REMOVAL FROM CALENDAR:
None
ORAL COMMUNICATION:
None
PUBLIC HEARING:
1. Application No.(s): ASA-2013-01, TR-2013-02
Applicant: Kevin Chiang (Home of Christ Church)
Location: 10420 Bubb Rd
Architectural and Site approval to allow façade and roof modifications of an existing office
building for church assembly use, additional improvements include parking lot, landscaping,
a trellis and trash enclosures;
Tree removal permit to allow the removal and replacement of three trees that are part of an
approved landscape plan for a proposed church in an existing office space
Administrative Hearing decision final unless appealed.
Staff Member Jung reported that the application is to allow the applicant to facilitate moving forward
with a prior approval to move church assembly uses into an existing building already located on the
Church’s property. The applicant is proposing some simple façade and landscaping changes to the
site. The property is currently occupied by the Church and by Apple, Inc. There is a shared parking
agreement between the two parties. The Church uses for parking normally happen outside the
2 Administrative Hearing
October 9, 2014
operating hours for the Apple employees, so there is no impact to surrounding businesses. The
applicant is proposing changes to the entry and exits to the Church. They will be adding mechanical
equipment to the rooftop for a new HVAC system and new skylights. There is also an ancillary shed
roof which will be part of the new sanctuary space which will be incorporated into the new design.
The applicant is also proposing to remove three trees at the front of the property. The applicant will
replace them with five new trees at the southern part of the property. There will also be new shared
trash enclosure. The northern side of the property is currently under development by Apple, Inc. The
applicant’s proposal is for the southern side of the property.
Hearing Officer Chao asked about the roof screen. He expressed concern about the large screening
wall. Architect, Kevin Chiang explained that the new screening wall would replace the existing wall,
not be on top of it, and would sufficiently hide the new equipment. The Hearing Officer expressed a
concern that the rooflines would not hide the rooftop equipment due to the various angles. Architect
Chiang explained that the existing roof’s structural design necessitated this new screening wall design
and as a benefit, the Church’s maintenance personnel would have easier access to the roof.
The Hearing Officer asked that clarification of the roof design be discussed with Staff as part of the
building permit process to explore options to reduce the size of the proposed screening wall.
He Hearing Officer was also concerned about the vertical metal corrugated walls, he asked the
applicant to work with Staff to see about the option of using horizontal panels to help reduce the
visual mass to the structure.
DECISION: The applications were approved by the Hearing Officer per the draft resolutions with
modifications:
To require the applicant to work with Staff to reduce the size of the screening wall and to
look at the possibility of using horizontal metal wall panels rather than vertical ones.
ADJOURNMENT
Respectfully submitted:
/s/Beth Ebben
Beth Ebben
Administrative Clerk
g:planning/AH Committee/Minutes100914
ADMINISTRATIVE HEARING STAFF REPORT
Agenda Item No. 1. Agenda Date: November 13, 2014
SUBJECT
Architectural and Site Approval for Sites C and D of Phase 2A of a previously entitled office,
R&D campus (Apple Campus 2) and update to a previously approved Tree Removal Permit
RECOMMENDATION
Staff recommends that the Hearing Officer approve the:
1. Architectural and Site Approval, ASA-2014-08 in accordance with the Draft Resolution
(Attachment 1)
2. Tree Removal Permit, TR-2014-59, in accordance with the Draft Resolution (Attachment 2)
DESCRIPTION
A. Application Summary
Applications: ASA-2014-08 and TR-2014-59
Applicant: Wolfgang Wagener
Property Owner: Apple Inc.
Property Location: Properties located east and west of N. Tantau Avenue bounded by
Calabazas Creek to the north and west, City of Santa Clara limits to the
east and Interstate 280 (I-280) to the south
APNs: 316-06-038; 316-06-039; 316-18-025; 316-18-026; 316-18-027
B. Project Description
1. Architectural and Site approval to review office, research and development facilities in
three buildings, associated parking structure, restaurant and site improvements for
Phase 2 of a previously approved office, research and development campus.
2. Tree Removal Permit to refine a previously approved Master Tree Removal Permit (TR -
2011-39) for an office, research and development campus.
OFFICE OF COMMUNITY DEVELOPMENT
CITY HALL
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3308 • FAX (408) 777-3333 • planning@cupertino.org
ASA-2014-08, TR-2014-59 Apple Campus 2 November 13, 2014
Sites C and D Page 2
C. Project Data Summary
Existing/Approved Proposed
General Plan Designation Industrial/Residential No change
Zoning Designation P(MP) No change
Consistency with General Plan Yes Yes
Consistency with Zoning Yes Yes
Environmental Assessment Apple Campus 2 Final EIR
(certified Oct. 15, 2013)
Addendum to Final EIR
prepared (Attachment 3)
Site Area (acres) 15.83 No change
Hardscape 12.48 10.77
Softscape 3.35 5.06
Total Development Area
(sq.ft.) 1
925,000 980,800
Total Building Area 525,000 516,000
Office 280,000 288,050
Restaurant 20,000 15,950
North Testing Facility 225,000 70,000
South Testing Facility 142,000
Total Unoccupied Area 32,000 34,800
Satellite Plant South 32,000 2,800
Data Center (basement of
Parking Structure)
- 32,000
Employees 1,400 1,400
Parking
Surface 300 241
Below-Grade 840 279
Parking Structure 0 620
Bicycle Parking (min. 5% of
automobile parking
requirement at 1 stall/285 s.f.)
Required – 91 Provided > 91
Setbacks
Front Setback (min.) 15’
1:1 slope line on N.
Tantau Avenue
Consistent with previous
entitlements
ASA-2014-08, TR-2014-59 Apple Campus 2 November 13, 2014
Sites C and D Page 3
Existing/Approved Proposed
Street Side Setback (min.) 15’ Consistent with previous
entitlements
Setback from Creek Subject to requirements
of the Streamside
Modification Permit
under Municipal Code
Chapter 19.19, Water
Resources Protection
Consistent with previous
entitlements
Rear setback (min.) 25’
Adjacent to residential
zones – 100’
Consistent with previous
entitlements
Building Height (max.) Up to 60’ Consistent with previous
entitlements
Tree Removal 235 trees 263 trees
1 Site B of Phase 2 is not part of the current ASA application
BACKGROUND
The applicant, Apple Inc., received approval from the City Council in November 2013 to
demolish existing office, research and development buildings and replace them with a new
office, research and development campus to be developed in two phases. The project, referred
to as Apple Campus 2, is located in the North Vallco Area and encompasses approximately 176
acres. While Apple received entitlements for the entire project site, including the establishment
of the building envelope for Phase 2 of the project, Architectural and Site Approvals were only
obtained for Phase 1.
At this time, Apple is seeking architectural review for a portion of Phase 2 of the project. This
portion of Phase 2, which is referred to as Phase 2A, includes Sites C and D located east and
west of North Tantau Avenue, bounded on the west and north by Calabazas Creek, the City of
Santa Clara city limits on the east and I-280 to the south. Site B which encompasses the
remainder of the Phase 2 area, or Phase 2B, is not part of the current Architectural and Site
Approval application.
The surrounding land uses include:
To the north and west: Office, research and development facilities
To the south: I-280 freeway; and
To the east: Single family residential uses and Jenny Strand Park, abutting the I-280
freeway, both in the City of Santa Clara
ASA-2014-08, TR-2014-59 Apple Campus 2 November 13, 2014
Sites C and D Page 4
With the approved entitlement from November 2013, Phase 2 (Sites B, C and D) may consist of
up to 600,000 square feet of office and research and development buildings with 1,740 parking
stalls and two satellite plants for energy generation.
DISCUSSION
Architectural and Site Approval Application
Site Plan
The 15.83-acre project area encompasses Sites C and D of Apple Campus 2 Phase 2. Site C is
located on the east side of N. Tantau Avenue and will be developed with two testing facilities,
parking garage and satellite plant. Site D is located on the west side of N. Tantau Avenue and
proposes an office building, including a 300-seat employee cafeteria and approximate 100-seat
outdoor terrace with a food kiosk. A total of 1,140 parking spaces will be provided on Sites C
and D, consistent with the original project approval, to meet the parking demand for this phase
of development. The number of parking spaces required for the entire project was determined
by conducting a parking study of Apple’s current campus at Infinite Loop and properties at
Mariani Avenue. While the total number of parking spaces remains the same from the
previously approved plans, the configuration has changed with the proposed construction of a
parking garage, increasing the number of surface (or above -grade) parking spaces from 300
stalls to 861 stalls and decreasing the number of below-grade spaces from 840 parking stalls to
279 stalls. A total of 26 electric vehicle (EV) charging stalls plus two accessible EV stalls are
provided onsite.
Fire access to the property will be provided from a signalized intersection on N. Tantau
Avenue, with secondary fire access provided via a staircase from N. Tantau Avenue close to the
I-280 freeway overpass near the parking structure, as approved by the Santa Clara County Fire
Department.
Sitework and Grading
A moderate amount of grading is expected to occur on the project site to accommodate the
basement parking garage for the office building proposed on Site D and the basement of the
parking structure on Site C which will be used utilized as a Data Center. Up to 160,000 cubic
yards (c.y.) of excavated material was previously analyzed in the project EIR, with the majority
(150,000 c.y.) planned for off-haul from the site. Under the current proposal, 110,000 c.y. will be
excavated and 90,000 c.y. will be off-hauled. A large percentage of the excavated material
retained on site will be used for the placement of landscaped berms around the site. The
amount of excavation has been reduced since the approval of the project due to the elimination
of a large basement parking area previously planned on the East side of Tantau Avenue.
Building Architecture
The architectural design for the proposed office building and testing facilities is compatible with
the main Apple Campus 2 concept. The buildings have a simple design ethic and feature a
ASA-2014-08, TR-2014-59 Apple Campus 2 November 13, 2014
Sites C and D Page 5
mostly glass façade with a white opaque blade glass awning at each level, capped by a parapet
at the top floor. The heating and cooling equipment for the buildings is located on the roof and
screened by a metal, mechanical screen with a horizontal louver design. The design of the
parking garage and satellite plant also follow the simple design ethic as described below.
Energy efficiency is a large consideration in the design of the buildings. One of the objectives
for the Apple Campus 2 development is to achieve a net zero energy development by
constructing energy efficient buildings, generating a significant amount of the Campus’ energy
from on-site renewable sources.
Office Building
A 4-story office building is proposed on Site D, which is bounded by Calabazas Creek to the
west and the north, N. Tantau Avenue to the east and I-280 to the south. The office building
consists of 288,050 square feet of office space, 15,950 square feet of amenity space including a
300-seat cafeteria and espresso bar and coffee areas on each level, and an underground parking
garage with 279 parking spaces. In addition, the site also includes an outdoor food kiosk with
an outdoor terrace to seat approximately 100 employees.
The building is comprised of three pods. Two of the three pods are mirror images of each other
on levels two to four but are different on the first floor. The first floor includes the cafeteria in
the pod located at the north end of the building while the pod at the south end includes locker
rooms and some office space. The third (central) pod comprises of office space on all four levels.
The two end pods are connected with the central pod by common areas including lobbies,
staircases and elevators, restrooms, print and copy rooms, and meeting rooms.
The office building will be approximately 56 feet above grade, plus an additional 12 feet for the
rooftop mechanical screen.
Testing Facilities
As noted above, the two testing facilities on Site C have a similar architectural design as the
proposed office building. The testing facilities, however, will only be 2-stories (approximately
35 feet) in height. The rooftop mechanical screen extends 10 feet above the roofline. The north
testing facility is approximately half the footprint of the south testing facility.
Parking Garage
The main parking garage for this phase of development is located on the east side of N. Tantau
Avenue closest to I-280. This facility will contain 620 parking spaces including 588 standard
spaces, 13 accessible spaces, 18 EV charging stalls and one accessible EV stall . Access to the
garage is from a controlled intersection on N. Tantau Avenue. The structure consists of five
parking levels with 108 to 133 parking spaces on each level. The façade of the structure is
similar to the main parking garage on the Phase 1 portion of the project and consists of concrete
ASA-2014-08, TR-2014-59 Apple Campus 2 November 13, 2014
Sites C and D Page 6
columns with cable rails stretched between them. In addition, there is a 32,000-s.f. basement
consisting of a data center, mechanical rooms and ancillary storage space. The parking garage
incorporates photo-voltaic (PV) panels mounted on the rooftop.
The plans indicate two options for the parking garage, one with a mesh façade and one without
the mesh façade. The applicant has indicated that the owners have shown a preference for the
façade without the mesh for purposes of construction. A condition has been added to reflect this
change.
Satellite Plant
South of the parking structure is a 2,800-sq. ft. satellite plant building and associated service
yard. The satellite building will house chillers and cooling towers to serve the data center in the
basement of the parking structure. The chillers will be fully enclosed within the satellite
building on the ground level, with the cooling towers located above the chillers and surrounded
on all four sides by the building walls but open to the sky above. The building will be
constructed of CMU block with metal horizontal louver cladding, similar to the metal
horizontal louver design proposed for the rooftop mechanical screens. The surrounding service
yard consists of mechanical and electrical equipment including back-up generators, electrical
substation, water and fire pumps and two trash compactors.
Ligting
A condition has been added for review and approval of a photometric plan prior to building
permit issuance to ensure that there is no offsite glare or that light sources are not visible.
Landscaping & Fencing
The proposed landscaping is consistent with the City’s requirements related to Water
Efficiency. A condition has been added to ensure that a Landscape Project Submittal is
submitted prior to issuance of final occupancy.
Existing fencing along the I-280 frontage is proposed to be replaced with a soundwall and
sections of the fencing along the rear property line, adjacent to the existing residences in the
City of Santa Clara, is proposed to be replaced with 8-ft tall wall. A condition has been added to
require review and approval of landscape screening of the soundwall from the freeway prior to
issuance of final occupancy.
Amenity Space
The amenity space indicated on these plans is consistent with the entitlement for the project.
While approved office space may be converted to amenity spaces, the existing amenity space
may not converted to office space without modification of the Development Agreement
approved by the City. A condition of approval has been added to restrict the conversion of any
amenity spaces to non-amenity spaces.
ASA-2014-08, TR-2014-59 Apple Campus 2 November 13, 2014
Sites C and D Page 7
Tree Removal Permit
The overall Apple Campus 2 site included 4,506 existing trees, mainly located within the Phase
1 portion of the project in parking lot landscaped islands, interior courtyards and around the
Glendenning Barn. The EIR evaluated the removal of 3,620 trees, of which 90 would be
relocated elsewhere on the site and approximately 800 trees would be saved in place where
grading would not affect the existing trees. Sites C and D of Apple Campus Phase 2 included
407 existing trees, of which 235 trees were approved for removal while the rest of the project
was approved for removal of 3,337 trees.
Under the current application, adjustments are being made to the number of trees being
removed on the project, however, the number of trees being removed do not exceed the number
of trees studied for removal in the EIR. Adjustments are as follows:
Phase 1:
In addition to the trees previously proposed to be retained on the site, Apple was
able to retain ten trees in place and transplant nine additional trees.
17 additional trees needed to be removed to facilitate widening of Wolfe Road or
installation of traffic related mitigation measures at the intersection of
Homestead Road and Tantau Avenue.
Four additional trees on the interior of the site needed to be removed due to
conflicts and ill-health.
Phase 2A (Sites C and D):
In addition to the trees previously proposed to be retained or transplanted,
Apple is proposing to retain ten trees in place and transplant one tree.
Four trees previously identified as being retained in place are proposed to be
transplanted.
The majority of the trees along the eastern edge of site D, adjacent to the existing homes in the
City of Santa Clara, are being saved; thereby, ensuring that the existing mature trees will
provide adequate buffer from the ongoing construction and provide a mature canopy for the
campus upon project construction. However, the removal of 39 additional trees is needed as a
result of site plan refinements and due to ill health and stress from the drought and lack of
irrigation in certain areas of the site. The removal of these trees are not located adjacent to the
existing homes in the City of Santa Clara. Trees proposed for removal are located as follows:
27 trees in the southeast area of site D adjacent to I-280 and N. Tantau Avenue, and
12 trees along the eastern property line adjacent to the Jenny Strand Park.
In addition to the 138 trees that will remain and six trees to be transplanted, a pproximately 780
trees will be planted on-site as replacement for the trees being removed in accordance with
Municipal Code requirements. Details of the tree replacements are provided on Page 4.30 of the
plan set (Attachment 5 – Plan Set). The City’s consulting arborist, Michael Bench, concurred
ASA-2014-08, TR-2014-59 Apple Campus 2 November 13, 2014
Sites C and D Page 8
with and recommended approval of the proposed tree removal plan (Attachment 4).
ENVIRONMENTAL REVIEW
The California Environmental Quality Act (CEQA) requires that all State and local governments
consider the consequences of projects over which they have discretionary authority. The
Environmental Impact Report (EIR) created as a result of review under CEQA must disclose the
significant environmental impacts of the project and, in addition, identify the following:
Significant cumulative impacts of the project in combination with past, present and
reasonably foreseeable future projects.
Mitigation measures and alternatives to reduce these effects;
Significant impacts that cannot be avoided;
Growth-inducing impacts; and
Effects found not to be significant.
An EIR was prepared in accordance with the requirements of CEQA. The EIR reviewed the
Phase 2 portion of the project based on the building envelopes proposed by Apple. The
proposed plans indicate the that buildings are within the envelopes approved previously by the
City Council. The proposed plans have been evaluated by LSA Associates, Inc. in their memo
dated November 4, 2014 and the analysis indicates that the architectural refinements that the
applicant is seeking would not require major revisions to the Final EIR certified on October 15,
2013, due to new or substantially increased significant environmental effects. Furthermore,
there have been no substantial changes with respect to the circumstances under which these
refinements would be undertaken that would require major revisions of the Final EIR due to
new or substantially increased significant environmental effects, and there has been no
discovery of new information of substantial importance that would trigger or require major
revisions to the Final EIR due to new or substantially increased significant environmental
effects.
The certified Final EIR adequately identifies all environmental effects and adequate mitigation
measures for the proposed modifications to the previously approved project. Therefore, no
subsequent or supplemental EIR is required prior to approval of the Architectural and Site
Approval to Phase 2A of Apple Campus 2 Project described above.
NOTICING AND COMMUNITY OUTREACH
A brief summary of outreach on the project is presented in the table below:
Notice of Public Hearing, Site Notice & Legal Ad Agenda
Site Signage (14 days prior to the hearing)
Adjacent noticing to neighbors along the
eastern property line for all phases of
project (10 days prior to the hearing)
All interested parties (emailed/noticed)
(at least 10 days prior to the hearing)
Posted on the City's official notice
bulletin board
(one week prior to the hearing)
Posted on the City of Cupertino’s
Website
ASA-2014-08, TR-2014-59 Apple Campus 2 November 13, 2014
Sites C and D Page 9
Public Comments
The City received one phone call from a concerned resident of the City of Santa Clara regarding
the height of the nearby testing facilities. The proposed 2-story building (approx. 35 ft. in height
plus 10-ft. roof screen) will replace an existing 1-story building. While the testing facility will
exceed the height of the existing building on-site, the proposed building is under the 60-ft
height allowance studied in the EIR and approved with the Apple Campus 2 master plan.
PERMIT STREAMLINING ACT
This project is not subject to the Permit Streamlining Act (Government Code Section 65920 –
65964). The City has 60 days from the date of application to make a decision on the project.
NEXT STEPS
The Hearing Officer’s decision on this project is final unless an appeal is filed within 14 calendar
days of the date of the mailing of the decision. All approvals granted by the Hearing Officer
shall go into effect after 14 days.
Prepared by: Piu Ghosh, Senior Planner
ATTACHMENTS
1. Draft Resolution ASA-2014-08
2. Draft Resolution TR-2014-59
3. Third Addendum to Environmental Impact Report dated November 4, 2014
4. Michael Bench Memo - Review of Trees Proposed for Removal
5. Plan Set dated October 2014
ATTACHMENT 1
ASA-2014-08
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
DRAFT RESOLUTION
OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF
CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL
PERMIT FOR PHASE 2A (SITES C AND D) OF APPLE CAMPUS 2
SECTION I: PROJECT DESCRIPTION
Application No.: ASA-2014-08 (EA-2011-12)
Applicant: Wolfgang Wagener (Apple Campus 2)
Property Owner: Apple, Inc.
Location: Properties located east and west of N. Tantau Avenue bounded by
Calabasas Creek to the north and west, City of Santa Clara limits to the
east, and Interstate 280 to the south (APNs: 316-06-038 & -039; and 316-18-
025 thru -027)
WHEREAS, based on substantial evidence in the administrative record, on October 15, 2013, the
City Council held a public hearing to consider the approval of an office, research and
development campus; and
WHEREAS, after consideration of evidence contained in the entire administrative record, at the
public hearing on October 15, 2013, the City Council adopted Resolution No. 13-082 certifying
the EIR, adopting Findings and a Statement of Overriding Considerations, adopting Mitigation
Measures, and adopting of a Mitigation Monitoring and Reporting Program; and
WHEREAS, the City Council approved an office, research and development campus for Apple
Inc. including entitlements for a phased development of the campus which included the
development of properties along N. Tantau Avenue in separate phases; and
WHEREAS, an application was received by the City (Application ASA-2014-08) for
Architectural and Site Approval to allow office, research and development facilities in three
buildings, associated parking structure, restaurant and site improvements for Phase 2 of a
previously approved office, research and development campus; and
WHEREAS, an application was received by the City (Application No. TR-2014-59) to refine a
previously approved Master Tree Removal Permit (TR-2011-39) for an office, research and
development campus; and
Draft Resolution ASA-2014-08 November 13, 2014
Page 2
WHEREAS, the Architectural and Site Approval is required for the previously entitled office,
research and development buildings with associated parking facilities; and
WHEREAS, the Tree Removal Permit is required to allow refinements to the previously
approved Tree Removal Permit; and
WHEREAS, the necessary public notices have been given as required by the procedural
ordinances of the City of Cupertino and the Government Code, and the Administrative Hearing
Office held a public meeting on November 13, 2014 in regard to the applications; and
NOW, THEREFORE, BE IT RESOLVED:
After careful consideration of the, maps, facts, exhibits, testimony and other evidence submitted
in this matter, the Administrative Hearing Officer hereby approves Application No. ASA-2014-08
based upon the findings described in Section II of this resolution, the administrative record, and
subject to the conditions specified in Sections III, IV and V of this resolution.
SECTION II: FINDINGS
WHEREAS, the Administrative Hearing Officer finds that:
1. The proposal, at the proposed location, will not be detrimental or injurious to property or
improvements in the vicinity, and will not be detrimental to the public health, safety,
general welfare or convenience;
The Project is designed to minimize the impact upon the surrounding community and the
environment. In order to reduce its impact on the environment, the Project will utilize onsite
photovoltaics and fuel cells and obtain the remainder of its energy needs from the State of California
Direct Access Program, off-site Apple-owned renewable energy projects or grid-purchased renewable
energy. The project has been designed to minimize its impact upon the neighbors, adjacent roads and
freeways and the environment. Appropriate mitigation measures to address traffic impacts along with
the implementation of an aggressive but achievable Transportation Demand Management Plan will
further reduce the traffic impacts of the project. Adequate buffer has been provided around the project
to allow privacy and to reduce impacts to neighbors. The project will be part of a corporate bike
sharing program. The project also has an on-site restaurant with several smaller indoor and one
outdoor dining facility.
The project increases the amount of landscaped green space over the existing conditions. The project
will incorporate both young and mature trees, and native and drought tolerant plants, that will thrive
in Santa Clara County with minimal water consumption. The project proposes to add at least 780
additional trees to the site and increase the pervious surface areas on site significantly improving
stormwater quality and reducing run-off. Adequate emergency access has been provided on site. The
design of the Project and its environmental attributes are not detrimental to the health, safety, peace,
morals and general welfare of persons residing or working in the neighborhood of the subject parcels.
Draft Resolution ASA-2014-08 November 13, 2014
Page 3
2. The proposal is consistent with the purposes of this chapter, the General Plan, any specific
plan, zoning ordinances, applicable planned development permit, conditional use permits,
variances, subdivision maps or other entitlements to use which regulate the subject property
including, but not limited to, adherence to the following specific criteria:
The project is in compliance with the General Plan and the Zoning regulations governing the project
site. The architecture of the proposed project particularly furthers General Plan Policy 2-14:
Attractive Building and Site Design “by careful attention to building scale, mass and placement,
architecture, materials, landscaping, screening of equipment and loading areas and related design
considerations.” The project design incorporates several of the strategies included in this General
Plan Policy including articulation and segmentation of wall and roof planes, visual openings in the
wall plane, appropriate setbacks and hierarchical landscaping. Most of the parking for the project is
provided in structured parking that is located underground or on the portion of the site that away
from adjacent neighbors.
a. Abrupt changes in building scale should be avoided. A gradual transition related to
height and bulk should be achieved between new and existing buildings.
The Project will involve the demolition of all the existing buildings on the site and the
construction of new buildings. The buildings approved with this Architectural and Site Approval
all meet the height restrictions of the General Plan. The structure on the site meet the
development regulations for the Master Plan approved for the project. The applicant is retaining
existing mature trees along the rear property line shared with residences in the City of Santa
Clara. These trees help screen the new buildings from the neighbors.
b. In order to preserve design harmony between new and existing buildings and in order
to preserve and enhance property values, the materials, textures and colors of new
buildings should harmonize with adjacent development by being consistent or
compatible with design and color schemes, and with the future character of the
neighborhood and purposes of the zone in which they are situated. The location, height
and materials of walls, fencing, hedges and screen planting should harmonize with
adjacent development. Unsightly storage areas, utility installations and unsightly
elements of parking lots should be concealed. The planting of ground cover or various
types of pavements should be used to prevent dust and erosion, and the unnecessary
destruction of existing healthy trees should be avoided. Lighting for development
should be adequate to meet safety requirements as specified by the engineering and
building departments and provide shielding to prevent spillover light to adjoining
property owners.
The buildings will be visible from the public right-of-way but minimally from the neighboring
properties due to the existence of mature trees along the property line. The project proposes to
demolish all existing buildings and structures on the site and convert an outmoded business park
into a world-class corporate campus with a significant increase in open space and pervious
surface. The property values in the adjacent area will be maintained or enhanced due to proximity
to this employment center. The walls, fencing, hedges and screen planting have been designed to
Draft Resolution ASA-2014-08 November 13, 2014
Page 4
minimize the impacts upon adjacent properties and to be aesthetically pleasing. Storage areas and
service buildings will be shielded from view or set sufficiently back from the property line to not
be visible. Permeable surface area has been increased greatly on the site in order to increase open
space. The destruction of healthy trees has occurred where there are direct conflicts, but will be
replaced by more trees than are removed. The lighting for the development has been designed so as
to not spill over onto adjacent properties. Mature trees are being retained along the perimeter of
the site and several large trees are being planted and others being transplanted to the perimeter of
the site to ensure that there is no glare and light from the development.
c. The number, location, color, size, height, lighting and landscaping of outdoor
advertising signs and structures shall minimize traffic hazards and shall positively affect
the general appearance of the neighborhood and harmonize with adjacent development.
The Project approval does not propose any signage and therefore this finding does not apply to
this project. However, Apple will file separate signage permits in the future which will be
reviewed, in order to minimize impact upon traffic, the general appearance of the neighborhood
and harmonize with adjacent development.
d. With respect to new projects within existing residential neighborhoods, new
development should be designed to protect residents from noise, traffic, light and
visually intrusive effects by use of buffering, setbacks, landscaping, walls and other
appropriate design measures.
The Project is designed to minimize impacts upon adjacent neighborhoods by the use of tree
planting and extensive setbacks to minimize the visibility of the buildings and to ensure that light
and glare do not spill onto adjacent development. The parking structure is located at the southern
edge of the property and will be minimally visible only from the freeway. Large landscaped buffers
are being proposed along the shared property lines while the buildings are setback significantly
from residential developments. As described in the EIR, operational noise levels will be minimal
due to both the setbacks and the nature of the operations and construction noise will be mitigated
through the construction of a temporary soundwall during construction.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT
DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the plan set dated October, 2014 consisting of 73 pages labeled Title
Page, P-1.10, P-1.21,P-1.30, P-1.40, P-1.20, P-1.50, Site – Masterplan, P-2.20, P-2.21, P-2.30,
P-2.31, P-2.40, P-2.41, P-3.00, Site – Civil, P-3.10, P-3.20, P-3.21, P-3.30, P-3.31, P-3.40, P-3.50,
Site – Landscape, P-4.00, P-4.09, P-4.10, P-4.15, P-4.16, P4.20, P4.30 - P4.33, P4.40, P4.41,
P4.50, P4.60, P4.70, Architecture – Office, P-5.00, P-5.01, P-5.03, P-5.10, P-5.20, P-5.30,
Architecture – Testing Facilities, P-6.00, P-6.01, P-6.10, P-6.20, P-6.30, P-7.00, P-7.01, P-7.10,
P-7.20, P-7.30, Architecture – Parking Structure, P-8.00 - P-8.03, P-8.10 - P-8.30,
Architecture – Visualizations, and P-9.00 - P-9.05, titled “Apple Campus 2 – Phase 2, North
Tantau Ave – Sites C + D, Site & Architectural Review, October 2014” prepared by Foster
Draft Resolution ASA-2014-08 November 13, 2014
Page 5
+ Partners, OLIN, and Luk and Associates, except as may be amended by conditions in
this resolution.
2. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks, property size,
building square footage, any relevant easements and/or construction records. Any
misrepresentation of any property data may invalidate this approval and may require
additional review.
3. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file nos. GPA-2011-03, Z-2011-03, DP-2011-04, U-
2011-11, ASA-2011-14, TM-2011-03, DA-2011-01, EA-2011-12 and TR-2011-39 shall be
applicable to this approval.
4. LANDSCAPE PLAN
The final landscaping plan shall be reviewed and approved by the Planning Division prior
to issuance of building permits.
5. BICYCLE PARKING
The applicant shall provide bicycle parking and bike racks for the proposed project in
accordance with the City’s Parking Regulations under Chapter 19.124 of the Cupertino
Municipal Code.
6. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the Community
Development Department.
7. EXTERIOR BUILDING MATERIALS/TREATMENTS
Final building exterior treatment plan (including but not limited to details on exterior
color, material, architectural treatments and/or embellishments) shall be reviewed and
approved by the Director of Community Development prior to issuance of building
permits. The final building exterior plan shall closely resemble the details shown on the
original approved plans. Any exterior changes determined to be substantial by the
Director of Community Development shall require a minor modification approval with
neighborhood input.
8. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees, dedication
requirements, reservation requirements, and other exactions. Pursuant to Government
Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the
amount of such fees, and a description of the dedications, reservations, and other
exactions. You are hereby further notified that the 90-day approval period in which you
may protest these fees, dedications, reservations, and other exactions, pursuant to
Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-
day period complying with all of the requirements of Section 66020, you will be legally
barred from later challenging such exactions.
Draft Resolution ASA-2014-08 November 13, 2014
Page 6
9. LIGHTING
Prior to issuance of the applicable permit for exterior and site lighting for Phase 2A, the
applicant shall submit an outdoor lighting photometric plan to the Planning Division for
final review and approval.
10. SOUNDWALL SCREENING
Prior to issuance of a building permit for Phase 2A, the applicant shall submit revised
landscape plans identifying landscape screening of the soundwall along I-280 for review
and approval of the Planning Division.
11. PARKING STRUCTURE DESIGN
Prior to issuance of a building permit for Phase 2A, the applicant shall submit revised
plans for the parking structure eliminating the previously proposed mesh architectural
element. The final design of the parking structure shall be subject to review and approval
of the Planning Division.
12. PLAN AMENDMENTS
Unless specifically reviewed and approved as part of a separate application, any area
within the proposed Phase 2A buildings designated as an amenity shall not be converted
to a non-amenity use and the addition of a roof element on the satellite plant building
shall be prohibited.
13. LANDSCAPE INSTALLATION REPORT
The project is subject to all provisions delineated in the Landscape Ordinance (CMC,
Chapter 14.15). A landscape installation audit shall be conducted by a certified landscape
professional after the landscaping and irrigation system have been installed. The findings
of the assessment shall be consolidated into a landscape installation report.
The landscape installation report shall include, but is not limited to: inspection to confirm
that the landscaping and irrigation system are installed as specified in the landscape and
irrigation design plan, system tune-up, system test with distribution uniformity, reporting
overspray or run-off that causes overland flow, and preparation of an irrigation schedule.
The landscape installation report shall include the following statement: “The landscape
and irrigation system have been installed as specified in the landscape and irrigation
design plan and complies with the criteria of the ordinance and the permit.”
14. LANDSCAPE AND IRRIGATION MAINTENANCE
Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be
established and submitted to the Director of Community Development or his/her
designee, either with the landscape application package, with the landscape installation
report, or any time before the landscape installation report is submitted.
a) Schedules should take into account water requirements for the plant establishment
period and water requirements for established landscapes.
b) Maintenance shall include, but not be limited to the following: routine inspection;
pressure testing, adjustment and repair of the irrigation system; aerating and de-
Draft Resolution ASA-2014-08 November 13, 2014
Page 7
thatching turf areas; replenishing mulch; fertilizing; pruning; replanting of failed
plants; weeding; pest control; and removing obstructions to emission devices.
c) Failed plants shall be replaced with the same or functionally equivalent plants that
may be size-adjusted as appropriate for the stage of growth of the overall installation.
Failing plants shall either be replaced or be revived through appropriate adjustments
in water, nutrients, pest control or other factors as recommended by a landscaping
professional.
15. SOIL ANALYSIS REPORT
A soils analysis report shall document the various characteristics of the soil (e.g. texture,
infiltration rate, pH, soluble salt content, percent organic matter, etc) and provide
recommendations for amendments as appropriate to optimize the productivity and water
efficiency of the soil.
The soil analysis report shall be made available to the professionals preparing the
landscape and irrigation design plans in a timely manner either before or during the
design process. A copy of the soils analysis report shall be submitted to the Director of
Community Development as part of the landscape documentation package.
16. UTILITY STRUCTURE PLAN
Prior to issuance of building permits, the applicant shall work with staff to provide a
detailed utility plan to demonstrate screening or undergrounding of all new utility
structures [including, but not limited to backflow preventers (BFP), fire department
connections (FDC), post-indicator valves (PIV), and gas meters] to the satisfaction of the
Director of Community Development, Public Works, Fire Department, and applicable
utility agencies.
17. SCREENING
All mechanical and other equipment on the building or on the site shall be screened so
they are not visible from public street areas or adjoining developments. Screening
materials/colors shall match building features and materials. The height of the screening
shall be taller than the height of the mechanical equipment that it is designed to screen.
The location of equipment and necessary screening shall be reviewed and approved by the
Director of Community Development prior to issuance of building permits.
18. INDEMNIFICATION
To the extent permitted by law, the Applicant shall indemnify and hold harmless the City,
its City Council, its officers, employees and agents (the “indemnified parties”) from and
against any claim, action, or proceeding brought by a third party against the indemnified
parties and the applicant to attack, set aside, or void this ordinance or any permit or
approval authorized hereby for the project, including (without limitation) reimbursing the
City its actual attorneys’ fees and costs incurred in defense of the litigation. The City may,
in its sole discretion, elect to defend any such action with attorneys of its choice.
Draft Resolution ASA-2014-08 November 13, 2014
Page 8
SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT
19. CONCURRENT APPROVAL CONDITIONS
The project shall comply with the conditions of approval required as part of the Apple
Campus 2 entitlements and related amendments.
SECTION V: CONDITIONS ADMINISTERED BY THE SANTA CLARA COUNTY FIRE
DEPARTMENT
20. ACCESS ROADWAYS
Fire Department access roadways shall conform to Santa Clara County Fire Department
Standards.
21. SECONDARY EMERGENCY ACCESS
Secondary emergency access mitigations shall be provided as specified in the letter from
Apple Computer dated October 16, 2014.
PASSED AND ADOPTED this 13th day of November, 2014 at a Regular Meeting of the
Administrative Hearing Meeting of the City of Cupertino, State of California, by the following
roll call vote:
AYE: HEARING OFFICER:
NOE: HEARING OFFICER:
ATTEST: APPROVED:
Piu Ghosh Gary Chao
Senior Planner Assist. Dir. of Community Development
ATTACHMENT 2
TR-2014-59
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
DRAFT RESOLUTION
OF THE ADMINISTRATIVE HEARING MEETING OF THE CITY OF
CUPERTINO TO ALLOW REFINEMENTS TO A PREVIOUSLY APPROVED
MASTER TREE REMOVAL PERMIT (TR-2011-39) FOR APPLE CAMPUS 2
SECTION I: PROJECT DESCRIPTION
Application No.: TR-2014-59
Applicant: Wolfgang Wagener (Apple Campus 2)
Property Owner: Apple, Inc.
Location: Area bounded by East Homestead Road, North Tantau Avenue, I-280,
North Wolfe Road including properties located on the east side of North
Tantau Avenue (APN Nos. 316-06-033; 316-06-038; 316-06-039; 316-06-045;
316-06-046; 316-06-048; 316-06-049; 316-06-050; 316-06-051; 316-06-052;
316-06-053; 316-07-044; 316-07-045; 316-07-046; 316-09-019; 316-09-027;
316-09-028; 316-18-012; 316-18-025; 316-18-026; 316-18-027; 316-18-035)
WHEREAS, based on substantial evidence in the administrative record, on October 15, 2013, the
City Council held a public hearing to consider the approval of an office, research and
development campus; and
WHEREAS, after consideration of evidence contained in the entire administrative record, at the
public hearing on October 15, 2013, the City Council adopted Resolution No. 13-082 certifying
the EIR, adopting Findings and a Statement of Overriding Considerations, adopting Mitigation
Measures, and adopting of a Mitigation Monitoring and Reporting Program; and
WHEREAS, the City Council approved an office, research and development campus for Apple
Inc. including entitlements for a phased development of the campus which included the
development of properties along N. Tantau Avenue in separate phases; and
WHEREAS, an application was received by the City (Application ASA-2014-08) for
Architectural and Site Approval to allow office, research and development facilities in three
buildings, associated parking structure, restaurant and site improvements for Phase 2 of a
previously approved office, research and development campus; and
Draft Resolution TR-2014-59 November 13, 2014
Page 2
WHEREAS, an application was received by the City (Application No. TR-2014-59) to refine a
previously approved Master Tree Removal Permit (TR-2011-39) for an office, research and
development campus; and
WHEREAS, the Architectural and Site Approval is required for the previously entitled office,
research and development buildings with associated parking facilities; and
WHEREAS, the Tree Removal Permit is required to allow refinements to the previously
approved Tree Removal Permit; and
WHEREAS, the necessary public notices have been given as required by the procedural
ordinances of the City of Cupertino and the Government Code, and the Administrative Hearing
Office held a public meeting on November 13, 2014 in regard to the applications; and
NOW, THEREFORE, BE IT RESOLVED:
After careful consideration of the, maps, facts, exhibits, testimony and other evidence submitted
in this matter, the Administrative Hearing Officer hereby approves Application No. TR-2014-59
based upon the findings described in Section II of this resolution, the administrative record, and
subject to the conditions specified in Sections III, IV and V of this resolution.
SECTION II: FINDINGS
WHEREAS, the Administrative Hearing Officer finds that:
1. The location of the trees restricts the economic enjoyment of the property by severely
limiting the use of property in a manner not typically experienced by owners of similarly
zoned and situated property, and the applicant has demonstrated to the satisfaction of the
approval authority that there are no reasonable alternatives to preserve the tree(s).
The applicant is proposing the removal of approximately 4,501 trees, including the relocation of 90
trees within the proposed project. The trees are part of approved landscape design for existing
buildings and parking lots. Since the buildings and parking lots will be demolished with this project,
the trees would be located in buildable areas. Retention of these landscape trees in their current
location would significantly restrict the ability to redevelop the property in a manner that differs from
the existing configuration of buildings and parking lots. The removal of these trees is necessary to
allow for the development of a project that makes use of the existing site more efficiently. Further, the
Project will result in a significant increase in the number of trees, including more native and drought
tolerant trees. Under the current application, adjustments are being made to the number of trees
being removed on the project, however, the number of trees being removed do not exceed the number
of trees studied for removal in the EIR. The majority of the trees along the eastern edge of Site D,
adjacent to the existing homes in the City of Santa Clara, are being saved; thereby, ensuring that the
existing mature trees will provide adequate buffer from the ongoing construction and provide a
mature canopy for the campus upon project construction. However, the removal of 39 additional trees
within the areas of Sites C and D is needed as a result of site plan refinements and due to ill health
and stress from the drought and lack of irrigation. The removal of these trees are not located adjacent
Draft Resolution TR-2014-59 November 13, 2014
Page 3
to the existing homes in the City of Santa Clara. The trees removed will be replaced in accordance
with the City’s Protected Tree Ordinance.
In addition to the trees that will remain and be transplanted on-site, approximately 780 new trees
will be planted as replacement for the trees being removed in accordance with Municipal Code
requirements. Details of the tree replacements are provided on Page 4.30 of the plan set referenced in
Section III.I of this resolution. Trees planted on site will be considered “protected” per the City’s
definition of Protected Trees. The consulting arborist has confirmed that the tree replacement plan
proposed by the applicant is consistent with the City’s Protected Tree Ordinance requirements.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT
DEPARTMENT
1. APPROVED EXHIBITS
Approval is based on the plan set dated October, 2014 consisting of 73 pages labeled Title
Page, P-1.10, P-1.21,P-1.30, P-1.40, P-1.20, P-1.50, Site – Masterplan, P-2.20, P-2.21, P-2.30,
P-2.31, P-2.40, P-2.41, P-3.00, Site – Civil, P-3.10, P-3.20, P-3.21, P-3.30, P-3.31, P-3.40, P-3.50,
Site – Landscape, P-4.00, P-4.09, P-4.10, P-4.15, P-4.16, P4.20, P4.30 - P4.33, P4.40, P4.41,
P4.50, P4.60, P4.70, Architecture – Office, P-5.00, P-5.01, P-5.03, P-5.10, P-5.20, P-5.30,
Architecture – Testing Facilities, P-6.00, P-6.01, P-6.10, P-6.20, P-6.30, P-7.00, P-7.01, P-7.10,
P-7.20, P-7.30, Architecture – Parking Structure, P-8.00 - P-8.03, P-8.10 - P-8.30,
Architecture – Visualizations, and P-9.00 - P-9.05, titled “Apple Campus 2 – Phase 2, North
Tantau Ave – Sites C + D, Site & Architectural Review, October 2014” prepared by Foster +
Partners, OLIN, and Luk and Associates, except as may be amended by conditions in this
resolution.
2. ACCURACY OF PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks, property size,
building square footage, any relevant easements and/or construction records. Any
misrepresentation of any property data may invalidate this approval and may require
additional review.
3. CONCURRENT APPROVAL CONDITIONS
The conditions of approval contained in file nos. GPA-2011-03, Z-2011-03, DP-2011-04, U-
2011-11, ASA-2011-14, ASA-2014-08, TM-2011-03, DA-2011-01, EA-2011-12 and TR-2011-39
shall be applicable to this approval.
4. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the Community
Development Department.
Draft Resolution TR-2014-59 November 13, 2014
Page 4
5. FINAL PLANTING PLAN
The applicant shall plant replacement trees in accordance with the replacement
requirements of the Protected Tree Ordinance. The trees shall be planted prior to final
occupancy of site permits.
The final planting plan shall be reviewed and approved by the Director of Community
Development prior to issuance of building permits. The Director of Community
Development shall have the discretion to require additional tree replacements as
deemed necessary. An ISA Certified Arborist shall confirm that the replacement trees
were planted properly and according to plan prior to final occupancy.
6. TREE REMOVAL
The applicant shall plant replacement trees for the Protected Trees that have been
approved for removal as identified in the MMRP (Exhibit DP-1). The applicant shall also
transplant trees as identified in the project plans and, if transplantation is not effective,
replacements shall be planted as identified in Exhibit DP-1.
7. TREE PROTECTION
As part of the demolition or building permit drawings, a tree protection plan shall be
prepared by a certified arborist for the trees to be retained. Tree protection measures shall
be consistent with the EIR. In addition, the following measures shall be added to the
protection plan:
For trees to be retained, chain link or other appropriate fencing and other root
protection shall be installed around the dripline of the tree prior to any project site
work.
No parking or vehicle traffic shall be allowed over root zones, unless using buffers
approved by the Project Arborist.
No trenching within the critical root zone area is allowed. If trenching is needed in
the vicinity of trees to be retained, the City’s consulting arborist shall be consulted
before any trenching or root cutting beneath the dripline of the tree.
Wood chip mulch shall be evenly spread inside the tree projection fence to a four-inch
depth.
Tree protection conditions shall be posted on the tree protection barriers.
Retained trees shall be watered to maintain them in good health.
The tree protection measures shall be inspected and approved by the City’s consulting
arborist prior to issuance of building permits. The City’s consulting arborist shall inspect
the trees to be retained and shall provide monthly updates on the health of the trees
retained in place and being transplanted. A report ascertaining the good health of the
trees mentioned above shall be provided prior to issuance of final occupancy.
8. TREE PROTECTION BOND
The applicant shall provide a tree protection bond in the amount of $1,000,000 to ensure
protection of 845 trees to be retained in place and 90 transplant trees on the site prior to
Draft Resolution TR-2014-59 November 13, 2014
Page 5
issuance of grading, demolition or building permits. The bond shall be returned after
completion of construction, subject to a letter from the City arborist indicating that the
trees are in good condition.
9. INDEMNIFICATION
To the extent permitted by law, the Applicant shall indemnify and hold harmless the City,
its City Council, its officers, employees and agents (the “indemnified parties”) from and
against any claim, action, or proceeding brought by a third party against the indemnified
parties and the applicant to attack, set aside, or void this ordinance or any permit or
approval authorized hereby for the project, including (without limitation) reimbursing the
City its actual attorneys’ fees and costs incurred in defense of the litigation. The City may,
in its sole discretion, elect to defend any such action with attorneys of its choice.
10. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees, dedication
requirements, reservation requirements, and other exactions. Pursuant to Government
Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the
amount of such fees, and a description of the dedications, reservations, and other
exactions. You are hereby further notified that the 90-day approval period in which you
may protest these fees, dedications, reservations, and other exactions, pursuant to
Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-
day period complying with all of the requirements of Section 66020, you will be legally
barred from later challenging such exactions.
SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT
11. CONCURRENT APPROVAL CONDITIONS
The project shall comply with the conditions of approval required as part of the Apple
Campus 2 entitlements and related amendments.
SECTION V: CONDITIONS ADMINISTERED BY THE SANTA CLARA COUNTY FIRE
DEPARTMENT
12. ACCESS ROADWAYS
Fire Department access roadways shall conform to Santa Clara County Fire Department
Standards.
13. SECONDARY EMERGENCY ACCESS
Secondary emergency access mitigations shall be provided as specified in the letter from
Apple Computer dated October 16, 2014.
Draft Resolution TR-2014-59 November 13, 2014
Page 6
PASSED AND ADOPTED this 13th day of November, 2014 at a Regular Meeting of the
Administrative Hearing Meeting of the City of Cupertino, State of California, by the following
roll call vote:
AYE: HEARING OFFICER:
NOE: HEARING OFFICER:
ATTEST: APPROVED:
Piu Ghosh Gary Chao
Senior Planner Assist. Dir. of Community Development
11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx)
LSA ASSOCIATES, INC.
2215 FIFTH STREET
BERKELEY, CALIFORNIA 94710
510.540.7331 TEL
510.540.7344 FAX
CARLSBAD
FRESNO
IRVINE
PALM SPRINGS
PT. RICHMOND
RIVERSIDE
ROCKLIN
SAN LUIS OBISPO
MEMORANDUM
DATE:DATE:DATE:DATE: November 4, 2014
TO:TO:TO:TO: Piu Ghosh, AICP, City of Cupertino
FROM:FROM:FROM:FROM: Judith Malamut, AICP, Principal, LSA Associates, Inc.
Kelly Bray, Planner, LSA Associates, Inc.
SUBJECT:SUBJECT:SUBJECT:SUBJECT: Third Addendum to the Apple Campus 2 Project Final Environmental Impact Report
(EIR), State Clearinghouse # 2011082055
This memorandum, prepared pursuant to the California Environmental Quality Act (CEQA), is a
Third Addendum to the certified Apple Campus 2 Project Final EIR.1,2 A previous, first Addendum to
the Final EIR was adopted by the City on April 9, 2014, in connection with the City’s approval of
minor modifications to the dimensions, geometry and footprint of several site buildings, a reduction
of parking spaces, and the addition of a Security Operations Center. A Second Addendum to the Final
EIR was adopted by the City in September 2014 in connection with the approval of minor
modifications to the Corporate Auditorium, Corporate Fitness Center, and Central Plant Equipment
Yard.
This Third Addendum evaluates proposed modifications to Apple Campus 2 Phase 2 North Tantau
Avenue Sites C and D portion of the project that were included in the Site and Architectural Review
Application submitted to the City of Cupertino (City) by Apple Inc. (project sponsor) in October
2014.3,4 The project applicant is requesting Architectural and Site approval and a Tree Removal
Permit for the Phase 2, Sites C and D portions of Apple’s previously approved office, research and
development campus. In general, the applications request minor changes to the approved amount,
type and location of the Phase 2 development and tree removal and replacement. In addition, the
locations and number of buildings have changed as has the parking configuration. Rather than being
spread out over Sites C and D or in underground garages, as previously proposed, the majority of
parking would now be housed in one aboveground parking structure. The number of parking spaces
would remain the same as previously approved, however. As discussed in this Third Addendum, the
proposed minor modifications to this Phase 2 portion of the project would not result in significant
environmental effects beyond those identified in the Final EIR.
1 LSA Associates, Inc., 2014. Addendum to the Apple Campus 2 Project Final Environmental Impact Report.
April 4.
2 LSA Associates, Inc., 2014. Second Addendum to the Apple Campus 2 Project Final Environmental Impact
Report. September 15.
3 Foster and Partners, 2014. Apple Campus 2 – Phase 2, North Tantau Avenue Sites C + D Site &
Architectural Review. June, revised and submitted October 2014.
4 The text on page 139 of Volume 1 of the EIR, i.e., the Draft EIR, mistakenly stated that Phase 2 of the
approved project would require a Development Permit. Pursuant to the City’s Municipal Code, a Site and
Architectural Permit is required, and a Development Permit is not required.
11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 2
LSA ASSOCIATES, INC.
The Final EIR,5 which was certified on October 15, 2013, evaluates the environmental impacts of
development of a new campus for Apple on a 176-acre site bordered generally by East Homestead
Road on the north, North Tantau Avenue on the east, Interstate 280 (I-280) and The Hamptons
apartments on the south, and North Wolfe Road on the west. The project would result in the
demolition of all existing structures within the project site and the construction of 3,420,000 square
feet of office, research, and development uses; 245,000 square feet of auditorium, fitness center, and
valet parking reception uses; 92,000 square feet of utility plants; and parking and ancillary buildings.
Significant environmental impacts would result in the following topical areas: Planning Policy; Land
Use; Biological Resources; Cultural Resources; Geology, Soils, and Seismicity; Hydrology and
Water Quality; Hazards and Hazardous Materials; Transportation and Circulation; Noise; Air Quality;
and Public Services and Utilities.
This Third Addendum is prepared pursuant to CEQA Guidelines Section 15164 which states: “The
lead agency or a responsible agency shall prepare an addendum to a previously certified EIR if some
changes or additions are necessary, but none of the conditions described in Section 15162 calling for
preparation of a subsequent EIR have occurred.” Section 15162 specifies that “no subsequent EIR
shall be prepared for that project unless the lead agency determines … one or more of the following”:
1. Substantial changes are proposed in the project which would require major revisions of the
previous EIR due to the involvement of new significant environmental effects or a substantial
increase in the severity of previously identified significant effects;
2. Substantial changes occur with respect to the circumstances under which the project is under-
taken which would require major revisions of the previous EIR due to the involvement of new
significant environmental effects or a substantial increase in the severity of previously identified
significant effects; or
3. New information of substantial importance, which was not known and could not have been
known with the exercise of reasonable diligence at the time the previous EIR was certified as
complete was adopted, shows any of the following:
(A) The project would have one or more significant effects not discussed in the previous EIR;
(B) Significant effects previously examined would be substantially more severe than shown in the
previous EIR;
(C) Mitigation measures or alternatives previously found not to be feasible would in fact be
feasible and would substantially reduce one or more significant effects of the project, but the
project proponents decline to adopt the mitigation measure or alternative; or
(D) Mitigation measures or alternatives which are considerably different from those analyzed in
the previous EIR would substantially reduce one or more significant effects on the environ-
ment, but the project proponents decline to adopt the mitigation measure or alternative.
Pursuant to CEQA Guidelines Section 15164(e), the following discussion summarizes the minor
modifications proposed as part of the Phase 2 North Tantau Avenue Sites C and D Application
submitted on September 11, 2014, the less-than-significant impacts associated with the proposed
minor modifications, and the reasons for the City’s conclusion that changes to the proposed project
5 LSA Associates, Inc., 2013. Apple Campus 2 Project Final EIR (State Clearinghouse No. 2011082055).
October.
11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 3
LSA ASSOCIATES, INC.
(and associated environmental effects) do not meet the conditions described in Sections 15162 and
15163 calling for preparation of a Subsequent EIR or a Supplement to an EIR.
A. MINOR MODIFICATIONS TO THE PROJECT
The following provides a summary of the approved Phase 2 development of Sites C and D evaluated in
the Final EIR and a description of the proposed modifications to Phase 2 development
1. Approved Phase 2 Development
The Phase 2 North Tantau Avenue Sites C and D Application identifies proposed changes to the portion
of Phase 2 development which is located south of Calabazas Creek, and east and west of North Tantau
Avenue. This portion of Phase 2 was previously described in the Final EIR as office, research and
development Buildings 4 through 13, as shown on Figure 1. The remaining portion of the Phase 2
development area (buildings 1 through 3), that is not being considered in this Addendum, is identified
as Site B and is located to the east of North Tantau Avenue and north of Calabazas Creek, as shown on
Figure 2.
The Final EIR approved up to four, four-story office, research and development buildings west of
North Tantau Avenue on Site D, and this approval granted development of up to 300,000 square feet
of building space. Also approved were up to six, three-story office, research and development
buildings east of North Tantau Avenue on Site C. This approval granted development of up to
225,000 square feet of building space. For Sites C and D, up to 1,140 below-grade and surface
parking spaces were also approved for an anticipated 1,400 employees, as shown on Figure 2.
2. Minor Modifications to Phase 2 Development
The proposed development, evaluated in this Addendum, would reconfigure the 10 buildings
approved for Sites C and D under the Final EIR, into five buildings as shown on Figure 3 and
described below. Other proposed site improvements include a parking structure access ramp, surface
parking lots, four on-campus Apple Shuttle stops, bicycle parking, and pedestrian paths.
Site D would consist of a four-story office building with an attached 300-seat employee cafeteria, and
an approximately 100-seat outdoor terrace with food kiosk. The building would replace the existing
buildings and surface parking lots on the site which include a two-story, 103,047-square-foot office
building at 10435 North Tantau Avenue, and a single-story, 9,000-square-foot temporary building
south of the main building that the project proponent has been utilizing for materials testing. The new
building would provide approximately 288,050 square feet of office use and 15,950 square feet of
restaurant use. The building would also include 280 below-grade parking spaces and 83 surface
parking stalls, an on-campus Apple Shuttle bus stop on the east side of the building, and employee
bicycle parking on the west side of the building. The maximum building height would be 60 feet, not
including the screens placed around the mechanical equipment on the roof of the building, which are
approximately 12 feet tall as shown on Figure 4.
Site C would consist of two, two-story research and development buildings, a five-story parking
garage, and a single-story satellite plant and mechanical yard, located to the south of the parking
structure. The buildings would replace the existing buildings and surface parking lots on the site
which include one two-story (40 feet tall), 100,650 square foot office building at 10300 North Tantau
Avenue and one single-story (22 feet tall), 45,740 square foot office building at 10400 North Tantau
11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 4
LSA ASSOCIATES, INC.
Avenue. On Site C, the proposed northern research and development building would be approxi-
mately 70,000 square feet and 36 feet in height, and the proposed south research and development
building would be approximately 142,000 square feet and 36 feet in height. The buildings would also
include 158 surface parking spaces, three on-campus Apple Shuttle bus stops on the east side of the
buildings, and employee bicycle parking on the west side of the buildings.
The proposed parking structure building would consist of approximately 320,000 square feet and 620
parking spaces. The garage would occupy a portion of the property where an existing two-story office
building is currently located on the site at 10300 North Tantau Avenue. A 32,000-square-foot data
center is proposed to be housed on the below-grade Level B1 in the parking structure. Above-grade
Levels 1 through 5 would provide structured parking, and the roof would provide support for
photovoltaic panels. The proposed maximum building height would be 57 feet and 6 inches, including
the photovoltaic panels. Additionally, an elevator “overrun” would be located on the roof and would
be at an elevation of 65 feet and 6 inches. Because the overrun contains and screens mechanical
equipment, the City allows this type of use to exceed the maximum building height.
The site plan for the satellite plant and mechanical yard is shown in Figure 5. As shown and described
on page 88 of the Final EIR, equipment at the satellite plant would house similar mechanical and
electrical equipment to that housed at the Central Plan (including transformers and emergency
generators). While the Satellite Plant South was expected to be approximately 30,000 square feet in
size and up to 15 feet in height (page 88 of the Final EIR), as currently proposed, the Satellite Plant
South would now include only approximately 5,000 square feet of accessory building uses.
3. Description of Minor Modifications to Phase 2 Development
For Sites C and D, the Final EIR approved a total of 525,000 square feet of building space, 400,000
square feet of accessory parking, 1,140 parking stalls, and a satellite plant use (see Table 1). The
modified proposed project for Sites C and D, would construct 516,000 square feet of building space,
and 462,000 square feet of parking structure (considered an accessory use) and a data center space.
While the amount of building square footage to house parking would be increased, there would be a
beneficial reduction in excavation and off-haul of materials, as well as an increase in landscaped area.
Of the proposed 516,000 square feet of proposed building space, the amount of space dedicated to
office uses has increased from the previously approved plans from 280,000 square feet to 288,050
square feet; the amount of space dedicated to restaurant facilities has decreased from 20,000 square
feet to 15,950 square feet; and the amount of research and development uses has decreased from
225,000 square feet to 212,000 square feet.
Of the proposed 462,000 square feet of accessory space, the amount of below-grade parking in
previously approved plans has decreased from 336,000 square feet to 110,000 square feet; the amount
of above grade structured parking has increased from 0 square feet to 320,000 square feet; the 32,000-
square-foot satellite plant has been reduced to 5,000 square feet; and a 32,000-square-foot data center
is now proposed for the basement level of the parking garage.
The proposed total site area remains unchanged from previously approved plans at 15.83 acres;
however, the amount of hardscape would decrease from 79 percent of the site to 68 percent of the
Phase 2 Sites C and D area. The amount of excavation would also decrease from 160,000 cubic yards
to 110,000 cubic yards, and the amount of off-haul would decrease from 150,000 cubic yards to
90,000 cubic yards.
7
NORTH TANTAU AVENUE
11 12
1310
fe
e
t
50
25
0 SO
U
R
C
E
:
AP
P
L
E
,
2
0
1
4
.
I:
\
C
O
C
1
3
0
1
A
p
p
l
e
C
a
m
p
u
s
2
\f
i
g
u
r
e
s
\
A
d
d
e
n
d
u
m
3
\
F
i
g
_
1
1
1
x
1
7
.
a
i
(
1
1
/
3
/
1
4
)
FIGURE 1 Apple Campus 2 Project EIR Third Addendum Previously Approved Phase 2 Sites C and D
11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 6
LSA ASSOCIATES, INC.
This page intentionally left blank.
Si
t
e
C
North
no
t
t
o
s
c
a
l
e
FIGURE 2
SO
U
R
C
E
:
A
P
P
L
E
,
J
U
N
E
2
0
1
4
.
I:
\
C
O
C
1
3
0
1
A
p
p
l
e
C
a
m
p
u
s
2
\f
i
g
u
r
e
s
\
A
d
d
e
n
d
u
m
3
\
F
i
g
_
2
.
a
i
(
9
/
1
8
/
1
4
)
Ap
p
l
e
C
a
m
p
u
s
2
P
r
o
j
e
c
t
E
I
R
T
h
i
r
d
A
d
d
e
n
d
u
m
Pr
o
p
o
s
e
d
P
h
a
s
e
2 Plan and Master Plan
11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 8
LSA ASSOCIATES, INC.
This page intentionally left blank.
NORTH TANTAU AVENUE
Si
t
e
D
Si
t
e
C
Si
t
e
C
Si
t
e
C
no
t
t
o
s
c
a
l
e
SO
U
R
C
E
:
AP
P
L
E
,
2
0
1
4
.
I:
\
C
O
C
1
3
0
1
A
p
p
l
e
C
a
m
p
u
s
2
\f
i
g
u
r
e
s
\
A
d
d
e
n
d
u
m
3
\
F
i
g
_
3
1
1
x
1
7
.
a
i
(
1
1
/
3
/
1
4
)
FIGURE 3 Apple Campus 2 Project EIR Third Addendum Proposed Phase 2 Sites C and D Site Plan
11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 10
LSA ASSOCIATES, INC.
This page intentionally left blank.
R
&
D
N
o
r
t
h
SI
T
E
D
SI
T
E
D
SI
T
E
C
ME
C
H
A
N
I
C
A
L
S
C
R
E
E
N
I
N
G
SI
T
E
D
R
&
D
S
o
u
t
h
Pa
r
k
i
n
g
S
t
r
u
c
t
u
r
e
Ty
p
i
c
a
l
S
e
c
t
i
o
n
D
e
t
a
i
l
Of
f
i
c
e
B
u
i
l
d
i
n
g
no
t
t
o
s
c
a
l
e
FIGURE 4
SO
U
R
C
E
:
A
P
P
L
E
,
J
U
N
E
2
0
1
4
.
I:
\
C
O
C
1
3
0
1
A
p
p
l
e
C
a
m
p
u
s
2
\f
i
g
u
r
e
s
\
A
d
d
e
n
d
u
m
3
\
F
i
g
_
4
.
a
i
(
9
/
1
8
/
1
4
)
Ap
p
l
e
C
a
m
p
u
s
2
P
r
o
j
e
c
t
E
I
R
T
h
i
r
d
A
d
d
e
n
d
u
m
Pr
o
p
o
s
e
d
P
h
a
s
e
2
S
i
t
e
s
C
a
n
d
D
T
y
p
i
c
a
l
S
e
c
t
i
o
n
s
no
t
t
o
s
c
a
l
e
FIGURE 5
SO
U
R
C
E
:
A
P
P
L
E
,
S
E
P
T
E
M
B
E
R
2
0
1
4
.
I:
\
C
O
C
1
3
0
1
A
p
p
l
e
C
a
m
p
u
s
2\
f
i
g
u
r
e
s
\
A
d
d
e
n
d
u
m
3
\
F
i
g
_
5
.
a
i
(
1
1
/
3
/
1
4
)
Ap
p
l
e
C
a
m
p
u
s
2
P
r
o
j
e
c
t
E
I
R
T
h
i
r
d
A
d
d
e
n
d
u
m
Pr
o
p
o
s
e
d
P
a
r
k
i
n
g
G
a
r
a
g
e
a
n
d
S
a
t
e
l
l
i
t
e
P
l
a
n
t
11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 13
LSA ASSOCIATES, INC.
The proposed 1,400 employees expected to
occupy Sites C and D remains unchanged
from previously approved plans. Similarly,
the 1,140 proposed parking stalls remains
unchanged from previously approved plans;
however, the configuration has changed due
to the construction of the parking garage.
The proposed number of surface parking
spaces has increased from 300 stalls to 861
stalls, but the number of below-grade
parking spaces has decreased from 840
stalls to 279 stalls.
Another minor change is that fire access to
the property would be provided from a
signalized intersection on North Tantau
Avenue, with secondary fire access being
provided via a staircase from North Tantau
Avenue close to the I-280 freeway overpass
near the parking structure. The proposed
fire access has been reviewed and approved
by the Santa Clara County Fire Department
which provides fire services for the City of
Cupertino.
Additionally, the Final EIR evaluated and
allowed the removal of 3,620 trees from the
entire development area. The proposed modifications would not require the removal of more trees
than is currently allowed. However, with proposed changes to the site plan and to distribution of the
buildings, there are some changes to which trees would be removed (some due to ill health and stress
from the drought and lack of irrigation). The changes to the tree removal plans were reviewed by the
City’s consulting arborist, Michael Bench, who prepared a brief memo that concurred with and
recommended approval of the proposed tree removal plan.6
4.Summary of Less-Than-Significant Impacts
The following provides a short discussion of the less-than-significant environmental impacts
associated with the proposed design modifications to Phase 2.
a.Aesthetics. The design modifications to Sites C and D would not result in environmental
impacts beyond those already identified in the Final EIR. The Final EIR evaluated the impacts of
four, three- to four-story buildings (up to 60 feet tall) on Site D, and six, two- to three-story buildings
(up to 60 feet tall) on Site C. The proposed project modifications would result in the development of
buildings of similar height: one, four-story office building (60 feet tall) on Site D, and two, two-story
buildings (36 feet tall), a five-story parking garage (60 feet tall), and a single-story satellite plant on
Site C (see Figure 5). The Final EIR evaluated the impacts of 525,000 square feet of development for
6 Bench, Michael, Consulting Arborist. 2014. A Review of Trees Proposed for Removal, Apple Campus 2,
Phase 2, Cupertino California, Memorandum. March 25.
Table 1: Summary of Proposed Changes to
Phase 2 Sites C and D Development
Site Information
Approved
Development
Proposed
Development
Total Site Area (acres) 15.83 15.83
Hardscape 12.48 10.77
Softscape 3.35 5.06
Employees 1,400 1,400
Parking
Surface Stalls 300 861
Below-Grade Stalls 840 279
Total Parking Stalls 1,140 1,140
Excavation (cubic yards) 160,000 110,000
Off-Haul (cubic yards) 150,000 90,000
Building Information (sq/ft)
Approved
Development
Proposed
Development
Total Building Area 525,000 516,000
Office 280,000 288,050
Restaurant 20,000 15,950
North Research Facilities 225,000 70,000
South Research Facilities 0 142,000
Total Unoccupied Area 400,000 467,000
Parking Below-Grade 336,000 110,000
Parking Structure 0 320,000
Satellite Plant South 32,000 5,000
Data Center 32,000 32,000
Total Development Area 925,000 983,000
Source: Foster and Partners, 2014.
11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 14
LSA ASSOCIATES, INC.
Sites C and D, and the design modifications would result in a reduced development footprint of
516,000 square feet.
The Final EIR evaluated the following accessory uses: 336,000 square feet of below-grade parking,
and a 32,000-square-foot Satellite Plant. The accessory use development totaled 400,000 square feet.
The proposed design modifications would result in the following accessory uses: 100,000 square feet
of below-grade parking, a 320,000-square-foot parking structure, a 32,000-square-foot data center,
and a 5,000-square-foot satellite plant. The Final EIR evaluated the impacts of 400,000 square feet of
development for Sites C and D, and the design modifications would result in an increased develop-
ment footprint to 462,000 square feet. As described above, the design modifications would result in a
reduction of impervious area from 12.48 acres to 10.77 acres and a reduction of 60,000 square feet of
material to be excavated and off haul from the site. The increase in total square footage for accessory
uses is related to the addition of the parking garage.
The design modifications would not result in new or more significant impacts to scenic views. The
Final EIR determined that scenic views of the Santa Cruz Mountains from nearby residential uses and
Jenny Strand Park (east of the site), are blocked by existing three-story buildings and mature trees that
line the existing project boundary. The newly configured north and south research and development
buildings would be constructed at a maximum building height of 36 feet, which is no taller than the
currently existing buildings, and is shorter than the previously approved development. Even with the
addition of 12-foot-tall mechanical screens, the buildings would not block views to a degree greater
than the approved development of buildings up to 60 feet tall. The parking garage building would be
approximately 60 feet tall including the 8-foot-tall photo voltaic cells, which is taller than the existing
building that it would replace, but not taller than the approved development and would not
significantly block views from streets or residential areas.
The reconfiguration of building space from ten separate buildings with smaller footprints to four
buildings with a similar total footprints and an increase in building height, would not significantly
change the visual character of the area or result in other design-related adverse aesthetic impacts
beyond those which were identified in the Final EIR. In the office building, the proposed project
would increase office use, and decrease indoor restaurant use. The programming of the outdoor
spaces associated with the office building on the west side of North Tantau Avenue would be
modified due to the addition of a 100-seat outdoor terrace that would be located adjacent to the
restaurant on the north side of the building. This new feature would not result in any new aesthetic
changes, as this part of the campus is setback from North Tantau Avenue and screened from public
view through the use of berms and landscaping.
b. Biological Resources. The design modifications to Sites C and D would not result in
environmental impacts beyond those already identified in the Final EIR. The consolidation of
buildings would result in a net reduction in impervious surface from 12.48 acres to 10.77 acres, and
an increase of approximately 1.5 acres of landscaped areas. The Final EIR evaluated the impacts of
the removal of 3,620 trees (see page 265 of the Apple Campus 2 Project Draft EIR). The design
modifications to Sites C and D would require the removal of 263 trees (fewer trees than originally
proposed), and the transplanting of 6 trees (see Figure 6). Therefore, the impacts due to the removal
of trees associated with the proposed design modifications are not new or more significant than those
analyzed in the Final EIR. The revised landscape plan utilizes native trees and shrubs, and proposes to
plant 780 new trees on Sites C and D. The replacement trees proposed to be planted are consistent
with the prior project approval and requirements of the Final EIR.
no
t
t
o
s
c
a
l
e
SO
U
R
C
E
:
AP
P
L
E
,
2
0
1
4
.
I:
\
C
O
C
1
3
0
1
A
p
p
l
e
C
a
m
p
u
s
2
\f
i
g
u
r
e
s
\
A
d
d
e
n
d
u
m
3
\
F
i
g
_
6
1
1
x
1
7
.
a
i
(
1
1
/
3
/
1
4
)
FIGURE 6 Apple Campus 2 Project EIR Third Addendum Proposed Tree Disposition Plan for Phase 2
11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 16
LSA ASSOCIATES, INC.
This page intentionally left blank.
11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 17
LSA ASSOCIATES, INC.
c. Greenhouse Gas Emissions. The design modifications to Sites C and D would not result in
environmental impacts beyond those already identified in the Final EIR. Due to design modifications,
the amount of site excavation would decrease from 160,000 cubic yards to 110,000 cubic yards, and
the amount of off-haul would decrease from 150,000 cubic yards to 90,000 cubic yards. The decrease
in excavation and off-haul would reduce less-than-significant impacts related to construction
activities, such as site preparation, site grading, on-site heavy-duty construction vehicles, and
equipment hauling materials to and from the site.
The operation of the proposed project would not create any new or more significant impacts due to
the design modifications. Services and facilities would be concentrated on one campus, reducing
vehicle trips among dispersed Apple buildings. The proposed office building and research and
development buildings would be built to achieve LEED Silver at a minimum, as indicated in the Final
EIR. There are no additional parking spaces proposed with the design modifications, therefore no new
incentive to drive. The design modifications do not propose additional employees, therefore no new
users of electricity and water. Apple Shuttle Stops, bicycle parking, and pedestrian paths have been
integrated into the site design as indicated in the TDM program. Photovoltaic cells would be installed
on the roof of the parking garage, as part of the effort to achieve zero net energy (consistent with AB
900). Pervious surface has been increased from 3.35 acres to 5.06 acres, which would decrease the
reflective surfaces and heat island effect of the campus, further reducing emissions.
d. Noise. The design modifications to Sites C and D would not result in environmental impacts
beyond those already identified in the Final EIR. The Final EIR evaluated noise impacts for sensitive
receptors closest to the Phase 2 construction area including residential uses and users of Jenny Strand
Park east of North Tantau Avenue. The design modifications do not propose new land uses that would
create new stationary or operational noise impacts and construction and operational noise levels
would continue to be acceptable due to the provision of adequate separation distance between the
residential neighborhoods and Sites C and D uses. The proposed parking garage would not result in a
significant impact to sensitive receptors because the closest receptors are more than 50 feet away and
noise from the parking structure would attenuate over that distance, resulting in a less-than-significant
impact. Additionally, the incorporation into the design of noise-insulating design features such as
walls and louvres, and sound attenuation devices to mitigate operational noise impacts and a
temporary sound wall, to mitigate construction noise impacts that would be installed between the
project site and the sensitive receptors would further reduce the already less-than-significant noise
impacts.
e. Population, Employment, Housing. The design modifications to Sites C and D would not
result in environmental impacts beyond those already identified in the Final EIR. The Final EIR
approved up to 1,400 employees at Phase 2 Sites C and D, and the proposed development is
consistent with this number of employees.
f. Transportation and Circulation. The design modifications to Sites C and D would not result
in environmental impacts beyond those already identified in the Final EIR. The Final EIR evaluated
the impacts of vehicle access for Phase 2 at North Tantau Avenue, south of Calabazas Creek and
three driveways east of North Tantau Avenue. There are no changes to the vehicle circulation of Sites
C and D, therefore, there would be no new impacts to fire access for Sites C and D. The modified site
design includes four new on-campus Apple Shuttle stops on the east side of the office building, and
both research and development buildings. Plans also include the provision of bicycle parking spaces
11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 18
LSA ASSOCIATES, INC.
and pedestrian walkways throughout the project area, which is consistent with the findings of the
Final EIR as recommended in the TDM program.
The Final EIR evaluated a total of 1,140 parking spaces in Phase 2 Sites C and D, including 840
below-grade spaces and 300 surface spaces. The currently proposed project provides 1,140 parking
spaces, including 861 surface spaces and 279 below-grade spaces. This represents an increase in
above-grade spaces, and a decrease in below-grade spaces, and is largely due in part to the addition of
the five-story parking garage.
The reconfiguration of surface parking spaces in the structured parking area would not affect traffic
flows or queuing because the new structure is located at the southernmost project boundary, and
would not be open to public use, nor is it adjacent to public streets. The proposed project modifica-
tions did not increase the number of parking spaces, and therefore would not incentivize driving such
that traffic volumes generated by the project would increase. Similarly, the design modification does
not decrease the number of parking spaces such that it would cause a shortage of parking, or over-
flows into the neighborhood. The parking structure would be above-grade, but would not create new
or more significant impacts than were identified in the Final EIR because it remains below the
maximum approved building height.
B. COMPARISON TO THE CONDITIONS LISTED IN CEQA GUIDELINES
SECTIONS 15162 AND 15163
The following discussion summarizes the reasons that a Subsequent EIR, pursuant to CEQA
Guidelines Sections 15162 and 15163, is not required to evaluate the environmental effects of the
currently-proposed project.
1. Substantial Changes to the Project
For the reasons stated above, the proposed minor modifications to the project would not result in new
significant environmental impacts beyond those identified in the Final EIR, would not substantially
increase the severity of impacts identified in the Final EIR, and thus would not require major revisions
to the Final EIR. Therefore, the proposed changes to the project would be minor refinements, not
substantial changes, and an Addendum is the appropriate document to address these minor modifica-
tions rather than a Subsequent EIR or a Supplement to the Final EIR.
2. Substantial Changes in Circumstances
Construction of the project is underway. Environmental conditions in and around the project site have
not changed such that implementation of the proposed minor modifications to the project would result
in new significant environmental effects or a substantial increase in the severity of environmental
effects identified in the Final EIR, and thus would not require major revisions to the Final EIR.
3. New Information
No new information of substantial importance, which was not known and could not have been known
when the Final EIR was certified, has been identified which shows that the proposed minor modifica-
tions to the project would be expected to result in: 1) new significant environmental effects not
identified in the Final EIR; 2) substantially more severe environmental effects than shown in the Final
EIR; 3) mitigation measures or alternatives previously determined to be infeasible would in fact be
11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 19
LSA ASSOCIATES, INC.
feasible and would substantially reduce one or more significant effects of the project, but the project
sponsor declines to adopt the mitigation measure or alternative; or 4) mitigation measures or alterna-
tives which are considerably different from those identified in the Final EIR would substantially
reduce one or more significant effects of the project but the project sponsor declines to adopt the
mitigation measure or alternative. In addition, as stated above in Parts B.1 and B.2, the proposed
minor modifications to the project would require no new mitigation measures because no new or
substantially more severe impacts are expected beyond those identified in the Final EIR.
Existing regulations (including City of Cupertino General Plan policies and Zoning Ordinance
regulations) and mitigation measures adopted and made conditions of project approval would
continue to apply.
C. CONCLUSION
The proposed minor modifications to the Apple Campus 2 Project Phase 2 buildings described in this
Third Addendum, would not require major revisions to the Final EIR due to new or substantially
increased significant environmental effects. There have been no substantial changes with respect to
the circumstances under which these minor modifications would be undertaken that would require
major revisions of the Final EIR due to new or substantially increased significant environmental
effects, and there has been no discovery of new information of substantial importance that would
trigger or require major revisions to the Final EIR due to new or substantially increased significant
environmental effects. Therefore, no subsequent or supplemental EIR is required prior to approval of
the minor modifications to the Phase 2 buildings, components of the Apple Campus 2 Project, as
described in this Third Addendum.
11/4/14 (P:\COC1301 Apple MM\Products\Third Addendum Phase 2\11-4-14 Third Addendum on Phase 2.docx) 20
LSA ASSOCIATES, INC.
This page intentionally left blank.
Apple Campus 2, Phase 2
Cupertino, California
Prepared by Michael L. Bench, Site Observations:
Consulting Arborist March 25, 2014
1
Michael L. Bench
Consulting Arborist
(831) 594-5151
7327 Langley Canyon Road
Prunedale, California 93907
A Review of Trees Proposed for Removal
Apple Campus 2, Phase II
Cupertino, California
Assignment
I was asked by Gary Chao, Planner, City of Cupertino, to review the request to
prepare a report regarding a preliminary meeting, which I had with the Apple staff
to review the trees on both sides of Tantau Drive near the 280 Freeway, Cupertino,
California.
Observations
The meeting was held on March 25, 2014. The Apple staff Meg Thomas and Dave
Muffly were in attendance. There was also a Landscape Architect and an Engineer
attending, but I did not make note of their names, which I have since forgotten.
We reviewed the trees along the east side property boundary, the trees along the south
property boundary adjacent to the 280 Freeway, and the trees around the buildings and
the parking lots at the properties on both sides of Tantau Avenue adjacent to the 280
Freeway.
The irrigation had become non-functional or had been turned off to the trees along the
property boundaries. This included the trees along the East side property boundary and
the trees along the south side property boundary adjacent to the 280 Freeway. All of the
trees in those areas were suffering from drought stress and many have declined in the past
few years. During the meeting I noted the condition of many of the trees by number. For
this report, I compared my notes to the assessments by David Babby in 2008 and by
Walter Levinson in 2011. Almost without exception, the individual trees in those areas
have declined, as a result of no irrigation.
The Additional Trees proposed for removal referred to as Phase II are all located in this
southeast area of the overall site adjacent to the 280 Freeway. Attached is a comparison
between the condition of these trees in 2008/2011 and now. Without irrigation, virtually
all trees have declined. This is not surprising considering the moisture needs of the
species involved.
Apple Campus 2, Phase 2
Cupertino, California
Prepared by Michael L. Bench, Site Observations:
Consulting Arborist March 25, 2014
2
The irrigation still functions for those trees adjacent to Tantau Avenue on the East side
parking lot. On the other hand, the irrigation to most of the trees in the parking lot on the
West side of Tantau Avenue is not functioning. The condition of the trees in the non-
irrigated areas is poor. Unfortunately the planting plan of the original buildings in these
areas used several species that require regular irrigation to perform. In those areas where
the irrigation has not functioned, the species requiring regular irrigation have all declined
without exception. The worst specimens are included on the attached list of trees to be
removed and replaced.
There are six trees planned to be planted in the Phase II area. These are:
European olive Tree # 5260
European olive Tree # 5263
Coast redwood Tree # 5153
Coast redwood Tree # 5186
Coast redwood Tree # 5187
Coast redwood Tree # 5188
Replacement Trees Planned
Among the tree planned for replacement are 315 evergreen and deciduous oak trees.
Once established, these trees will require minimal irrigation.
Both sides of Calaveras Creek for 50 feet from the top of the bank will be planted with
indigenous species only.
Large and small indigenous shrubs are planned to be mixed with the oak replacement
trees.
Conclusions
In my opinion, the proposed plan is well designed in terms of appropriate plants capable
of long term sustainability, and in terms of water conservation.
Recommendations
Based on my observations and conclusions, I recommend that the Phase II Plan be
approved.
Respectfully submitted,
Michael L. Bench, Consulting Arborist
International Society of Arboriculture Certification # WE 1897A
American Society of Consulting Arborists Member
Apple Campus 2
Phase II List of Trees
Near or Adjacent to 280 Freeway
Cupertino, California
Prepared by Michael Bench,
Consulting Arborist
Site Observations:
March 25, 2014
Field Data Sheet Trunk
Diameter
In Inches
As Reviewed By
David Babby 2008
or Walter Levinson
2011
Reviewed by
Michael Bench
3/25/14
DBH =
Diameter at Breast Height
=
54 inches Above Grade
Tree Name DBH Condition Condition Notes
4913 Red Box or Silver Dollar
Gum
15/9/6/4/4/
4
Fair Poor Stump Sprout
4914 Red Box or Silver Dollar
Gum
10/9/5 Fair Poor Stump Sprout
4916 Shamel Ash
(Fraxinus uhdei)
8/5 Poor Poor
4918 Red Box or Silver Dollar
Gum
25 Fair Poor
4920 Shamel Ash 17 Fair Extremely Poor
4922 Shamel Ash 10 Fair Poor
4923 Shamel Ash 13 Poor Poor
4924 Shamel Ash 6/3/3 Poor Extremely Poor
4925 Shamel Ash 12/11/7/6/5 Poor Extremely Poor Stump Sprout
4833 Shamel Ash 6/5/2/2 Poor Extremely Poor
4935 Shamel Ash 22 Fair Poor
4936 Bottlebrush 13 Good Fair
4838 Shamel Ash 13 Fair Poor
4939 Shamel Ash 16 Fair Poor
4940 Shamel Ash 10 Good Fair
4941 Shamel Ash 11 Good Fair
4952 Shamel Ash 12 Poor Extremely Poor
4944 Shamel Ash 12 Good Poor
4845 Shamel Ash 12 Good Fair
4846 Shamel Ash 8 Fair Poor
4947 Shamel Ash 17 Fair Poor
4948 Shamel Ash 10 Fair Extremely Poor
4949 Shamel Ash 11 Good Poor
4950 Shamel Ash 8 Fair Poor
4951 Shamel Ash 10 Fair Poor
4952 Shamel Ash 9 Poor Extremely Poor
4953 Shamel Ash 24 Fair Poor
5174 Shiny Xylosma
(Xylosma congestum)
8 Good Fair
5175 Monterey Pine
(Pinus radiata)
31 Fair Poor
5176 Monterey Pine 30 Fair Poor
5182 Coast Redwood
(Sequoia sempervirens)
11 Fair Fair
5183 Coast Redwood 21 Poor Extremely Poor Very Sparse Canopy
5189 Coast Redwood 27 Poor Extremely Poor Very Sparse Canopy
5191 American Sweet Gum
(Liquidambar styraciflua)
7 Fair Poor
5192 Coast Redwood 13 Poor Extremely Poor Very Sparse Canopy
5193 American Sweet Gum 6 Fair Extremely Poor
5195 Coast Redwood 37 Poor Extremely Poor Very Sparse Canopy
5196 Persimmon
(Diospyros americana)
5 Poor Poor
5197 Shamel Ash 17 Fair Poor