Loading...
HomeMy WebLinkAbout11-10-14 Searchable packetCITY OF CUPERTINO AGENDA Monday, November 10, 2014 10350 Torre Avenue, Council Chamber CITY COUNCIL 6:45 PM Special Meeting PLEDGE OF ALLEGIANCE ROLL CALL CEREMONIAL MATTERS AND PRESENTATIONS POSTPONEMENTS ORAL COMMUNICATIONS This portion of the meeting is reserved for persons wishing to address the council on any matter not on the agenda. Speakers are limited to three (3) minutes. In most cases, State law will prohibit the council from making any decisions with respect to a matter not listed on the agenda. CONSENT CALENDAR Unless there are separate discussions and/or actions requested by council, staff or a member of the public, it is requested that items under the Consent Calendar be acted on simultaneously. SECOND READING OF ORDINANCES PUBLIC HEARINGS 1.Subject: Certification of Final EIR, General Plan Amendment, Draft Housing Element, Rezoning, Specific Plan Amendment, Municipal Code Amendments Page 1 CITY OF CUPERTINO 1 November 10, 2014City Council AGENDA Recommended Action: The Planning Commission recommends that the City Council take the following actions in accordance with the Draft Resolutions (Attachments A - F) with the exceptions noted in Attachment G: 1.Adopt Resolution No. 14-210 for Certification of an Environmental Impact Report, adoption of Findings and a Statement of Overriding Considerations, and adoption of Mitigation Measures and a Mitigation Monitoring and Reporting Program, (EA-2013-03), in substantially similar form to the attached Resolution (Attachment A); 2.Adopt Resolution No. 14-211 approving GPA-2013-01 in substantially similar form to the attached Resolution (Attachment B and as amended by Attachment G): a.Draft General Plan (Community Vision 2040); and b.General Plan Map Amendments 3.Adopt Resolution No. 14-212 to authorize staff to, in substantially similar form to the attached Resolution (Attachment C and as amended by Attachment G): a.Forward the Draft 2014-2022 Housing Element to the State Department of Housing and Community Development (HCD); and b.Use the prioritized list of Alternative Housing Element sites (in case one or more of the adopted sites are not accepted by HCD as Housing Element sites) 4.Conduct first reading of Ordinance 14-2124, “An Ordinance of the City Council of the City of Cupertino Rezoning Certain Sites in the City for Conformance with the General Plan and Housing Element Zoning Map Amendment,” Z-2013-03 (Attachment D and as amended by Attachment G); 5. Conduct first reading of Ordinance 14-2125, “An Ordinance of the City Council of the City of Cupertino amending various Chapters in Title 18 and Title 19, including the amendment of the Density Bonus Ordinance, the addition of a Chapter in Title 19 to implement policies in the General Plan, the addition of a Chapter in Title 13 to improve readability,” Municipal Code Amendment, MCA-2014-01 (Attachment E); and 6. Adopt Resolution No. 14-213 approving Specific Plan Amendment, SPA-2014-01, in substantially similar form to the attached Resolution (Attachment F) The Balanced Plan is reflected in Attachments A - F. The Planning Commission’s changes to the exhibits to Attachments A - D are reflected in Attachment G. These changes are discussed in detail later in this report. CEQA Findings for adoption of the Balanced Plan and Housing Element sites recommended by staff are in Attachment H. Description: Application No(s): GPA-2013-01, Z-2013-01, GPA-2013-02, , SPA-2014-01, MCA-2014-01 (EA-2013-03) Applicant(s): City of Cupertino Page 2 CITY OF CUPERTINO 2 November 10, 2014City Council AGENDA Location: citywide Certification of Environmental Impact Report for a General Plan Amendment, Housing Element Update and Associated Rezoning; General Plan Amendment to establish citywide development allocations for commercial, office, hotel and residential uses and development parameters for key study areas (including the Vallco Shopping district); General Plan Amendment for the 2014-2022 Housing Element as required by State Law; Rezoning of certain parcels in conjunction with the citywide General Plan Amendment; Specific Plan Amendment to the Heart of the City Specific Plan related to maximum residential yield calculations and an updated map to conform to the General Plan; Municipal Code Amendment to comply with State Housing Law and the Housing Element of the General Plan and other zoning code amendments for clean-up and consistency Page 3 CITY OF CUPERTINO 3 November 10, 2014City Council AGENDA Staff Report.docx A - Draft Resolution 14-210, Recommend certification of the EIR B - Draft Resolution 14-211, Adoption of General Plan and Land Use Amendments C - Draft Resolution 14-212, Housing Element updates D - Draft Ordinance 14-2124, Zoning Map amendments E - Draft Ordinance 14-2125, Municipal Code Amendments F - Draft Resolution 14-213, Specific Plan Amendment G - Planning Commission Resolutions 6760-6765 H - Alternate CEQA Findings I - Planning Commission Staff Report 10-14-14 J - Housing Commission, Planning Commission, City Council prior staff report L - Approved Planning Commission Minutes 10-14-14, 10-20-14 K - Concept Alternative Maps M - General Plan and Housing Element errata since PC recommendation 10-20-14 N - Balanced Plan Map.pdf O - Planning Commission Reccommendation Map.pdf P - Market Study 2-13-14 Q - Retail Strategy Report 3-6-14 R - Housing Commission staff report 8-28-14 S - 2007-2014 Housing Element and Technical Appendix T - Site Priority List with criteria U - Summary of Land Use Map, Zoning Map and Muni Code Amendments V - Zoning Text Amendments with Redlines W - Specific Plan Amendments with Redlines X - PC Study Session Staff report 9-9-14 Y - CC Study Session staff report 10-7-14 Z - Draft EIR 6-18-14 AA - Responses to Comments 8-28-14 BB - Supplemental Text Revisions Memo 11-3-14 CC - Updated Late Comments Memo 11-3-14 DD - ERC recommendation EE - Public Comments related to the General Plan and Housing Element ORDINANCES AND ACTION ITEMS REPORTS BY COUNCIL AND STAFF ADJOURNMENT Page 4 CITY OF CUPERTINO 4 November 10, 2014City Council AGENDA The City of Cupertino has adopted the provisions of Code of Civil Procedure §1094.6; litigation challenging a final decision of the City Council must be brought within 90 days after a decision is announced unless a shorter time is required by State or Federal law. Prior to seeking judicial review of any adjudicatory (quasi-judicial) decision, interested persons must file a petition for reconsideration within ten calendar days of the date the City Clerk mails notice of the City’s decision. Reconsideration petitions must comply with the requirements of Cupertino Municipal Code §2.08.096. Contact the City Clerk’s office for more information or go to http://www.cupertino.org/index.aspx?page=125 for a reconsideration petition form. In compliance with the Americans with Disabilities Act (ADA), the City of Cupertino will make reasonable efforts to accommodate persons with qualified disabilities. If you require special assistance, please contact the city clerk’s office at 408-777-3223 at least 48 hours in advance of the meeting. Any writings or documents provided to a majority of the Cupertino City Council after publication of the packet will be made available for public inspection in the City Clerk’s Office located at City Hall, 10300 Torre Avenue, during normal business hours and in Council packet archives linked from the agenda/minutes page on the Cupertino web site. Members of the public are entitled to address the City Council concerning any item that is described in the notice or agenda for this meeting, before or during consideration of that item. If you wish to address the Council on any issue that is on this agenda, please complete a speaker request card located in front of the Council, and deliver it to the Clerk prior to discussion of the item. When you are called, proceed to the podium and the Mayor will recognize you. If you wish to address the City Council on any other item not on the agenda, you may do so by during the public comment portion of the meeting following the same procedure described above. Please limit your comments to three (3) minutes or less. Page 5 CITY OF CUPERTINO 5 CITY OF CUPERTINO Legislation Details (With Text) File #: Version:114-0175 Name: Status:Type:Public Hearings Agenda Ready File created:In control:5/19/2014 City Council On agenda:Final action:11/10/2014 Title:Subject: Certification of Final EIR, General Plan Amendment, Draft Housing Element, Rezoning, Specific Plan Amendment, Municipal Code Amendments Sponsors: Indexes: Code sections: Attachments:Staff Report.pdf A - Draft Resolution 14-210, Recommend certification of the EIR B - Draft Resolution 14-211, Adoption of General Plan and Land Use Amendments C - Draft Resolution 14-212, Housing Element updates D - Draft Ordinance 14-2124, Zoning Map amendments E - Draft Ordinance 14-2125, Municipal Code Amendments F - Draft Resolution 14-213, Specific Plan Amendment G - Planning Commission Resolutions 6760-6765 H - Alternate CEQA Findings I - Planning Commission Staff Report 10-14-14 J - Housing Commission, Planning Commission, City Council prior staff report L - Approved Planning Commission Minutes 10-14-14, 10-20-14 K - Concept Alternative Maps M - General Plan and Housing Element errata since PC recommendation 10-20-14 N - Balanced Plan Map.pdf O - Planning Commission Reccommendation Map.pdf P - Market Study 2-13-14 Q - Retail Strategy Report 3-6-14 R - Housing Commission staff report 8-28-14 S - 2007-2014 Housing Element and Technical Appendix T - Site Priority List with criteria U - Summary of Land Use Map, Zoning Map and Muni Code Amendments V - Zoning Text Amendments with Redlines W - Specific Plan Amendments with Redlines X - PC Study Session Staff report 9-9-14 Y - CC Study Session staff report 10-7-14 Z - Draft EIR 6-18-14 AA - Responses to Comments 8-28-14 BB - Supplemental Text Revisions Memo 11-3-14 CC - Updated Late Comments Memo 11-3-14 DD - ERC recommendation CITY OF CUPERTINO Printed on 11/4/2014Page 1 of 3 powered by Legistar™6 EE - Public Comments related to the General Plan and Housing Element Action ByDate Action ResultVer. City Council11/10/20141 Subject: Certification of Final EIR, General Plan Amendment, Draft Housing Element, Rezoning, Specific Plan Amendment, Municipal Code Amendments ThePlanningCommissionrecommendsthattheCityCounciltakethefollowingactionsin accordancewiththeDraftResolutions(AttachmentsA-F)withtheexceptionsnotedin Attachment G: 1.AdoptResolutionNo.14-210forCertificationofanEnvironmentalImpactReport,adoption ofFindingsandaStatementofOverridingConsiderations,andadoptionofMitigation MeasuresandaMitigationMonitoringandReportingProgram,(EA-2013-03),in substantially similar form to the attached Resolution (Attachment A); 2.AdoptResolutionNo.14-211approvingGPA-2013-01insubstantiallysimilarformtothe attached Resolution (Attachment B and as amended by Attachment G): a.Draft General Plan (Community Vision 2040); and b.General Plan Map Amendments 3.AdoptResolutionNo.14-212toauthorizestaffto,insubstantiallysimilarformtothe attached Resolution (Attachment C and as amended by Attachment G): a.ForwardtheDraft2014-2022HousingElementtotheStateDepartmentofHousingand Community Development (HCD); and b.UsetheprioritizedlistofAlternativeHousingElementsites(incaseoneormoreofthe adopted sites are not accepted by HCD as Housing Element sites) 4.ConductfirstreadingofOrdinance14-2124,“AnOrdinanceoftheCityCounciloftheCity ofCupertinoRezoningCertainSitesintheCityforConformancewiththeGeneralPlanand HousingElementZoningMapAmendment,”Z-2013-03(AttachmentDandasamendedby Attachment G); 5.ConductfirstreadingofOrdinance14-2125,“AnOrdinanceoftheCityCounciloftheCity ofCupertinoamendingvariousChaptersinTitle18andTitle19,includingtheamendment oftheDensityBonusOrdinance,theadditionofaChapterinTitle19toimplementpolicies intheGeneralPlan,theadditionofaChapterinTitle13toimprovereadability,”Municipal Code Amendment, MCA-2014-01 (Attachment E); and 6.AdoptResolutionNo.14-213approvingSpecificPlanAmendment,SPA-2014-01,in substantially similar form to the attached Resolution (Attachment F) TheBalancedPlanisreflectedinAttachmentsA-F.ThePlanningCommission’schangesto theexhibitstoAttachmentsA-DarereflectedinAttachmentG.Thesechangesarediscussed indetaillaterinthisreport.CEQAFindingsforadoptionoftheBalancedPlanandHousing Element sites recommended by staff are in Attachment H. Description: File #:14-0175,Version:1 CITY OF CUPERTINO Printed on 11/4/2014Page 2 of 3 powered by Legistar™7 File #:14-0175,Version:1 Application No(s): GPA-2013-01, Z-2013-01, GPA-2013-02, , SPA-2014-01, MCA-2014-01 (EA-2013-03) Applicant(s): City of Cupertino Location: citywide Certification of Environmental Impact Report for a General Plan Amendment, Housing Element Update and Associated Rezoning; General Plan Amendment to establish citywide development allocations for commercial, office, hotel and residential uses and development parameters for key study areas (including the Vallco Shopping district); General Plan Amendment for the 2014-2022 Housing Element as required by State Law; Rezoning of certain parcels in conjunction with the citywide General Plan Amendment; Specific Plan Amendment to the Heart of the City Specific Plan related to maximum residential yield calculations and an updated map to conform to the General Plan; Municipal Code Amendment to comply with State Housing Law and the Housing Element of the General Plan and other zoning code amendments for clean-up and consistency CITY OF CUPERTINO Printed on 11/4/2014Page 3 of 3 powered by Legistar™8 COMMUNITY DEVELOPMENT DEPARTMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 TELEPHONE: (408) 777-3308 www.cupertino.org CITY COUNCIL STAFF REPORT Meeting: November 10, 2014 Subject General Plan Amendment, 2014-2022 Housing Element, associated Rezoning, Zoning map and text amendments and Specific Plan Amendment. Recommendation The Planning Commission recommends that the City Council take the following actions in accordance with the Draft Resolutions (Attachments A – F) with the exceptions noted in Attachment G: 1. Adopt Resolution No. 14-210 for Certification of an Environmental Impact Report, adoption of Findings and a Statement of Overriding Considerations, and adoption of Mitigation Measures and a Mitigation Monitoring and Reporting Program, (EA-2013-03), in substantially similar form to the attached Resolution (Attachment A); 2. Adopt Resolution No. 14-211, GPA-2013-01 in substantially similar form to the attached Resolution (Attachment B and as amended by Attachment G), for: a. Draft General Plan (Community Vision 2040); and b. General Plan Map Amendments. 3. Adopt Resolution No. 14-212 to authorize staff to, in substantially similar form to the attached Resolution (Attachment C and as amended by Attachment G): a. Forward the Draft 2014-2022 Housing Element to the State Department of Housing and Community Development (HCD); and b. Use the prioritized list of Alternative Housing Element sites (in case one or more of the adopted sites are not accepted by HCD as Housing Element sites). 4. Conduct first reading of Ordinance 14-2124, “An Ordinance of the City Council of the City of Cupertino Rezoning Certain Sites in the City for Conformance with the General Plan and Housing Element Zoning Map Amendment,” Z-2013-03 (Attachment D and as amended by Attachment G); 5. Conduct first reading of Ordinance 14-2125, “An Ordinance of the City Council of the City of Cupertino amending various Chapters in Title 18 and Title 19, including the amendment of the Density Bonus Ordinance, the addition of a Chapter in Title 19 to implement policies in the General Plan, the addition of a Chapter in Title 13 to improve readability,” Municipal Code Amendment, MCA-2014-01 (Attachment E); and 9 2 6. Adopt Resolution No. 14-213 approving Specific Plan Amendment, SPA-2014-01, in substantially similar form to the attached Resolution (Attachment F). The Balanced Plan is reflected in Attachments A – F. The Planning Commission’s changes to the exhibits to Attachments A – D are reflected in Attachment G. These changes are discussed in detail later in this report. CEQA Findings for adoption of the Balanced Plan and Housing Element sites recommended by staff are in Attachment H. Description Application No.: GPA-2013-01, GPA-2013-02, SPA-2014-01, Z-2013-01 and MCA-2014-01 (EA- 2013-03) Applicant: City of Cupertino Property Location: City-wide Background On August 21, 2012, the City Council directed staff to begin a General Plan amendment in order to:  Replenish office and hotel allocations (after the office allocation was reduced to under 18,000 square feet since the Main Street project received most of the remaining office allocation in the city-wide allocation pool);  Inform the Vallco Shopping District Specific Plan;  Consolidate individual requests from property owners; and  Update to address State law, and address clean-up. In addition, in November 2013, the City initiated an update of the State-mandated Housing Element of the General Plan. The 2012-2022 Housing Element, which is a required component of the General Plan, identifies policies and appropriate locations for future housing in Cupertino. The Housing Element Update was combined with the General Plan Amendment process so the City and community could fully evaluate and discuss issues in one comprehensive outreach and planning process. This report provides a summary of key issues, recommendations by the Planning Commission and staff comments where appropriate. A detailed discussion of issues is provided in the Planning Commission staff report dated October 14, 2014 (Attachment I). The General Plan Amendment process has involved over 18 months of extensive community discussions and input provided during 24 public meetings, workshops, online comment surveys, and study sessions and hearings with the Housing Commission, Planning Commission and City Council. A detailed listing of the public input meetings is provided later in this report. The staff reports for the following study sessions and public hearings: January 23, 2014 Housing Commission, February 12, 2014 Housing Commission, February 19, 2014 Planning Commission, 10 3 March 4, 2014 City Council, and April 1, 2014 Joint Planning Commission/City Council are attached for both the General Plan and Housing Element projects (Attachment J). Alternatives After extensive input from the community, property owners, the Housing Commission and the Planning Commission, the City Council authorized studying the following alternatives in the Environmental Impact Report (EIR) that was prepared for the project. A brief discussion of alternatives is provided below (see Attachment K for Concept Alternative maps). The EIR has a detailed description of each alternative. A table showing specific allocations is provided later in the Development Allocations discussion later in this report. Alternative A Alternative A consists of the following themes and reflects minimal changes as follows:  Maintains the policies of the 2005 General Plan  Increases office and hotel development allocations  Combines the South De Anza and South Sunnyvale-Saratoga Special Areas  Streamlines General Plan area boundaries Alternative B Alternative B is derived from the following themes and reflects moderate increase in heights and densities in key areas:  Focuses new growth along major mixed-use corridors  Revises height standards at key nodes, gateways and sub areas along major mixed-use corridors  Increases office, hotel and residential development allocations  Supports the redevelopment of the Vallco Shopping District by reallocating allocation to other areas  Streamlines General Plan area boundaries This alternative also envisions the transformation of the Vallco Shopping Mall into a retail, employment, housing and entertainment destination. Alternative C Alternative C is derived from the following themes and reflects the property owners requests and reflects the most increase in heights and densities in key areas:  Supports the redevelopment of the Vallco Shopping District by reallocating allocation to other areas  Revise density and height standards at key nodes, gateways and sub areas along major  mixed-use corridors  Increases office, hotel and residential development allocations  Streamlines General Plan area boundaries 11 4 Alternative C identifies a way to transform the Vallco Shopping Mall into a locally and regionally significant retail, employment, housing and entertainment destination, and account for a large portion of the City’s RHNA. Planning Commission Public Hearings The Planning Commission held public hearings on the General Plan, Housing Element, associated rezoning, zoning text amendments and specific plan amendments and the EIR on October 14, 2014 and October 20, 2014. While some members of the Planning Commission felt that some amount of development (especially office) would help to achieve the City’s economic and fiscal goals, the majority felt that additional office growth would exacerbate the regional imbalance of jobs and housing and contribute to traffic. They did however agree that hotel rooms could be added since they provided a source of revenue to the City, were beneficial to nearby restaurants and businesses, and would be needed to serve existing and planned office in the City. The Commission recommended removal of the residential allocation since densities in the General Plan and zoning already regulate development on the sites. A summary of the Planning Commission’s recommendation is provided in the discussion on each key issue in the staff report. About eleven members of the public spoke at the meeting. They included property owners of Housing Element sites and study areas in the General Plan as well as a few residents. Attachment L is the minutes of the Planning Commission public hearings and includes detailed comments from the speakers. The following is a brief summary of comments:  Prefer the No Project alternative or Alternative A  Plan Bay Area doesn’t fit Cupertino residents’ needs  Vallco should not be a Housing Element site but should stay as retail only  Additional heights and community benefits should not be approved  We should not be afraid of additional heights if buildings are attractively designed  A residential allocation of close to 4,500 is too high. The Housing Element should only include 1,002 units to meet the RHNA  Do not add more office. Applicants who want more office should apply for amendments to the General Plan  Growth should not be focused only on Stevens Creek Boulevard and De Anza Boulevard  Excited about the Balanced Plan  Cupertino should plan for its share of additional growth in the Bay Area  Applicants reiterated their requests for additional office, residential and heights based on Alternative C. Additional discussion about specific requests is provided later in the report. Minor, non-substantive edits have been made to the General Plan (Attachment B) and Housing Element (Attachment C) documents that were presented to the Planning Commission to correct text errors, grammatical and syntactical errors and to add updates to language. An errata sheet identifying the changes made since the Planning Commission saw the documents is attached as Attachment M. 12 5 Discussion Draft General Plan (Community Vision 2040) The General Plan is a State-mandated document and provides the vision for Cupertino’s future It sets the City's policy direction in a number of areas including land use, mobility, housing, open space, infrastructure, health and sustainability through goals, policies, and strategies. The following is a discussion of state and regional laws, best practices and community input that have shaped the draft General Plan (Community Vision 2040). Community Vision 2040 has been informed by changes in Federal, State and regional regulations, best practices and community input, and achieving the community-building, sustainability and economic and fiscal goals in the Guiding Principles. The following section is a discussion of items that have been informed the Draft General Plan (Community Vision 2040). State and Regional regulations and best practices 1. Climate Change - The Global Warming Solutions Act of 2006 (AB 32) set a target to reduce California greenhouse gas emissions to 1990 levels by year 2020. In addition, the Governor signed Executive Order S-3-05 to further require California to reduce greenhouse gas emissions (GHG) by 80 percent below the 1990 levels by year 2050 (EO, 2005). The policies in Community Vision 2040 are consistent with these regulations. 2. Land Use and Transportation - The Sustainable Communities and Climate Protection Act of 2008 (SB 375) calls on each of the state’s 18 metropolitan areas to develop a Sustainable Communities Strategy to accommodate future population growth and reduce greenhouse gas emissions from cars and light trucks. Plan Bay Area, jointly adopted in 2013 by the Association of Bay Area Governments (ABAG) and the Metropolitan Transportation Commission (MTC), is the region’s first Sustainable Communities Strategy to meet the requirements of SB 375 through the year 2040. Community Vision 2040 is consistent with the principles of SB 375 by focusing growth along major transportation corridors and the City’s Priority Development Area (PDA) along Stevens Creek and North De Anza Boulevards defined in Plan Bay Area. 3. Complete Streets and Connectivity – The California Complete Streets Act (2008) places the planning, designing, and building of complete streets into the larger planning framework of the General Plan by requiring jurisdictions to amend their Mobility Elements to plan for multimodal transportation networks. 4. Performance Measures for Mobility - Senate Bill 743 (2013) creates a process to change the way that transportation impacts are analyzed under the California Environmental Quality Act (CEQA) to promote the state’s goals of reducing greenhouse gas emissions and traffic-related air pollution, promoting the development of a multimodal transportation system, and providing clean, efficient access to destinations. Specifically, SB 743 requires an alternative to automobile level of service (LOS) for evaluating transportation impacts. The Governor’s Office of Planning and Research is in the process of preparing new CEQA Guidelines to implement SB 743. 13 6 5. Sustainability – Various elements in Community Vision 2040 incorporate goals and policies related to air quality and greenhouse gas emissions targets set by AB 32, SB 375 and the Bay Area Air Quality Management District (BAAQMD). The Land Use and Community Design element focuses future growth along major transportation corridors consistent with past practice and SB 375. The focus on multi-modal transportation and complete streets in the Mobility element is consistent with past practice and recent State and regional regulations and guidance. The Sustainability Element has been updated to comply with regional requirements and to reflect the City’s current policies. In particular, three strategies have been identified to implement Principles of Sustainability. Strategies include the adoption and maintenance of a Climate Action Plan (CAP) to attain reduction targets consistent with state law and regional requirements, periodic reporting on and review of the effectiveness measures in the CAP, including assessment of lifecycle costs and preparation of a climate vulnerability assessment to safeguard human health and safety and community assets. Preparation of the CAP implementing these strategies is underway and will be presented to the City Council, tentatively, on December 16th, 2014. 6. Housing Element – recent changes in Housing Element law have been incorporated in addition to the 2014-2022 Regional Housing Needs Allocation (RHNA) for the City. This section is discussed in greater detail later in this report. Community Ideas and Best Practices 1. Community Benefit – The idea was first discussed by a community member and the Council was interested in exploring the possibility. The concept includes allowing additional specified heights in certain location if community benefits are provided as part of a project. The concept is discussed later in this report. 2. Walking and biking to schools, parks and shopping – This idea was discussed by several community members in public workshops and is consistent with SB 375, AB 32 and Complete Streets and best practices. 3. Design of mixed-use projects – A “mixed-use village” concept is recommended for mixed-use projects that include residential development. The concept was developed from Council, Planning Commission and public input and best practices regarding mixed-use projects. These include provision of viable retail, gathering places, pedestrian-oriented architecture and streetscape improvements, improving connectivity and neighborhood buffers. A similar but limited discussion is provided for “neighborhood center” redevelopment. 4. Vallco Shopping District –Public input from workshops regarding the transformation of the Vallco Shopping District into an active community gathering place and regional destination have been included. A detailed discussion is provided later in this report. 5. Calculation of residential density – The City Council and a member of the public requested changing calculation from density of the gross lot area (which includes portions of adjacent streets) to density of the net lot area (which does not include adjacent streets, driveway and 14 7 drainage easements, etc.). This change has been made to the Zoning Ordinance. The density and residential yield of Housing Element sites reflects this change. Balanced Plan and Planning Commission Recommendations Development Allocation Community Vision 2040 is a 25-year plan for the City’s future that considers community goals for active gathering places, health, sustainability, economic development and fiscal reliance, as well as regional requirements and mandates, while balancing residents’ need for minimizing traffic, air quality, and other environmental impacts. As noted earlier, the Planning Commission had recommendations that were different from the Balanced Plan. Maps to reflect the development allocations, heights and densities in the Balanced Plan and the Planning Commission recommendation have been attached as Attachments N & O. The Commission’s recommendations in each category are provided in the discussion below.  Economic and Fiscal – the City’s goal for the next 25 years is to ensure that companies and businesses thrive and new businesses are attracted to the City and that property owners have incentives to maintain and enhance property. The City Council recognized this when they authorized the increase in development allocation as part of the General Plan process. Maintaining an adequate allocation for development will help revenues grow so that the City can continue to provide excellent community services. A Market Study was conducted to see the realistic economic demand for various uses through 2035 (Attachment P). It notes that existing commercial space in the City’s General Plan Allocation pool is adequate to meet the high end of demand through 2035 and indicates market support for an additional 3.6 million net square feet for office space, 985 net hotel rooms and 4,420 residential units for the same period (close to Alternative C). o Office – Since the 2005 General Plan was adopted, the City has drawn down about 525,000 square feet through Apple and Main Street and other office development in the City, and currently only has a balance of 17,113 square feet remaining in city-wide office allocation. To account for redevelopment at the Vallco Shopping District and new office development for the next 25 years, an increase of 2,000,000 square feet is proposed (consistent with Alternative B). In the Balanced Plan, office allocation is balanced with other land uses to reduce environmental impacts while recognizing the City’s economic and fiscal goals. Request from a potential applicant and consultant response – On October 13, 2014, the City received a letter from a potential developer of the Vallco Shopping District generally stating that the costs of assembling the site, providing a minimum of 600,000 square feet of retail in a high quality mixed-use “Town Center” envisioned for the area, community benefits and off-site infrastructure costs, would require at least 2,000,000 square feet, or 1,000,000 square feet more than was recommended in the Balanced Plan (see Attachment CC). The City’s retail consultant reviewed the request and noted that given the high cost of site assembly and construction, an office allocation of up to 2,000,000 could potentially be necessary to make the project economically viable. However, it could not be verified without a proforma review. 15 8 Planning Commission Recommendation – The Planning Commission felt that the regional growth in jobs and lack of housing had exacerbated traffic conditions. In addition, by approving the Apple Campus 2, the City had added to this growth. Therefore, the City should only add 500,000 square feet of additional office growth above the 2005 General Plan for the next 25 year horizon. They also recommended moving the office allocation in the “Major Company” category (about 523,000 square feet) into the city-wide allocation pool. o Hotel – Since the 2005 General Plan was adopted, the City has drawn down 303 hotel rooms from the allocation leaving 339 rooms at time of project initiation. Hotels bring in considerable revenue, which will help realize community goals of economic and fiscal stability. Consistent with the Market Study, the recommendation is to add 1,000 more hotel rooms to the allocation. This is also consistent with Alternative C. Planning Commission Recommendation – The Planning Commission felt that hotel rooms generated revenue, and were beneficial to nearby businesses and necessary to serve existing and planned office in the City. The Commission, therefore, recommended adding 1,000 hotel rooms consistent with the Balanced Plan and Alternative C. o Residential – The State-mandated RHNA requirement is 1,064 units with about 1,400 recommended by the Housing consultant after consulting with the HCD. Subtracting 1,400 units from the remaining allocation of 1,895 units leaves 495 units through 2040, which will not be enough to meet RHNA targets for the two additional housing element cycles through 2040 per Plan Bay Area. Alternative A, which is consistent with the 2005 General Plan, and Alternative B, which only meets 75% of the Plan Bay Area targets, do not achieve the regional target. However Alternative C meets 100% of the targets set by Plan Bay Area. To ensure that the City is consistent with these regional targets, the recommendation is to increase the residential development allocation by 2,526 units (to 4,461 units which includes the 1,400 required for 2014-2022 cycle). The residential development allocation is a City legislative policy aimed at promoting the public welfare which tracks growth by monitoring permits. It cannot restrict growth in such a way as to conflict with State housing element requirements or regional needs. However, the Balanced Plan recommends strategies for managing the amount and form of housing growth as follows:  Selecting Housing Element sites for up to 1,400 units to meet the demand for the 2014-2022 RHNA period.  Revising the General Plan so that on sites with a mixed-use residential designation, residential is a permitted use only on Housing Element sites. Conditional use permits will be required on mixed-use Housing Element sites that propose units above the allocation in the Housing Element, and on Non-Housing Element mixed-use sites. Related changes will have to be made to the Municipal Code, Specific Plans and Conceptual Plans.  Form - The General Plan includes a “mixed-use village” strategy so that mixed-use residential sites provide substantial and viable retail, and also create a livable environment for residents, shoppers and workers on and around the site. 16 9 Planning Commission Recommendation – The Commission discussed the relevance of residential allocations, when densities were already noted in the General Plan and Zoning Ordinances. There was additional discussion about whether the number could be perceived as a growth control measure and whether a number, if any, should be generally consistent with Plan Bay Area (the region’s Sustainable Communities Strategy and Regional Transportation Plan). Ultimately, the Commission decided that the residential allocation number should be removed and that the Housing Element, lot densities and policies were sufficient to guide residential development in the City. Comments - While the City is not required by State Law to have a residential allocation in the General Plan, the City’s environmental consultants recommend retaining the allocation system for environmental review purposes. Removing the allocation would require additional CEQA analysis on the maximum capacity of residential development in the City, which would require additional time and budget. An allocation of 4,421 units is recommended to be consistent with Plan Bay Area estimates for the 25-year horizon through 2040 and to prevent an impression of growth restriction. Table 1 below is a comparison of the Planning Commission recommendation, the Balanced Plan and alternatives studied in the EIR. The numbers in the General Plan differ from the numbers reflected in Table 1 because there have been minor changes to the allocation balances since project initiation. These changes include allocation granted to projects approved and allocation returned to the pool due to projects expiring. Table 1 - Development Allocation Per Alternative (through 2040) Use Built/ Approved No Project/ 2005 General Plan Alt. A PC Recc. Alt. B Balanced Plan Alt. C Office (sf) Net Increase 8,929,775 540,231 1,040,231 1,040,231 2,540,231 2,540,231 4,040,231 0 500,000 1 500,000 2 2,000,000 1 2,000,000 1 3,500,0001 Commercial (sf) Net increase 3,729,569 701,413 701,413 701,413 3 701, 413 3 701,413 3 701,413 3 0 0 0 0 0 0 Hotel (rooms) Net Increase 1,090 339 600 1,339 839 1,339 1,339 0 261 1,000 500 1,000 1,000 Residential (units) Net Increase 21,339 1,895 1,895 Eliminate 3,316 4 4,421 4 4,421 4 0 0 N/A 1,421 2,526 2,526 Notes: 1. Office – includes Major Company allocation of 523,118 sf. 2. Office sf. in Planning Commission recommendation does not retain a Major Company allocation pool. 3. Commercial - assumes that the existing Vallco Mall square footage (1,267,601 sf) will be demolished and 600,000 sf min. will be built at site, with the remaining (625,335 sf) moved to the City-wide pool. The EIR conservatively analyzed 1,343,679 sf of commercial square footage due to the demolition and reconstruction of the Vallco Mall square footage. 4. Residential - includes the 1,400 units recommended for the 2014-2022 Housing Element. 17 10 Key Question 1: Development Allocation 1. What should the City plan for in terms of Development Allocation for office, commercial, hotel and residential units through 2040? Community Benefits Program As the City’s resident and worker population increases, additional amenities will be necessary to maintain and the livability of the community. The Community Benefit Program is one of the key tools to help finance and achieve those amenities that maintain and increase the community’s quality of life. The Program enables the community to get amenities in return for allowing additional specified heights within specified areas in the City. It also provides certainty as to what those additional heights might be and where they can be placed. It requires a Development Agreement, which means that the applicant may propose benefits and amenities to which the City may agree with. Key elements of the program include: 1. The proposed level of benefit is equivalent to at least 15% of the project valuation attributed to the increase in height (decided through preparation of a project proforma). 2. Projects must provide a ground floor retail component; and one or more of the following benefits: a. Transportation and Mobility Improvements (bike, pedestrian facilities, participation in a community shuttle program, etc.) b. Public Facilities (land or space). c. Senior Housing- 15% of housing that is not already targeted towards seniors. d. Public Art and Cultural Facilities (new or expansion to museum, teen center, etc.) e. Parks and Open Space (land/improvements within project or off-site) In lieu of the benefits outlined in Item 2, a “Cash-in-Lieu Contribution” may be made to the City for purchase of land, capital improvements or operations related to items a, b, d, e, and towards the construction of affordable housing. Planning Commission Recommendation – The Commission was split on the issue of community benefits. Some felt that the typical negotiation process used in most communities could potentially result in difficult situations at the project level, while others felt that the process could be improved if there was public involvement in the process. Some felt that community benefits could provide public amenities that would not otherwise have been obtained through a regular permit process. One commissioner felt that the developer should not have the option of paying the “in-lieu” cash payment and should be obligated to provide community benefits. Ultimately, the Commission decided not to recommend the Community Benefits Program and recommended eliminating all policies and strategies associated with Community Benefits from Community Vision 2040. Key Question 2: Community Benefits 1. Should Cupertino have a Community Benefits Program? 18 11 2. If yes, does the should there be any revisions to: a. Value of the community benefits? b. Specific program items – retail requirement or other items? Heights Community Vision 2040 envisions keeping heights and development standards in most of the City consistent with those in the 2005 General Plan. However, recognizing that the City needs to achieve regional housing goals, economic reliance and fiscal goals, while ensuring that adequate sites are reserved for future housing element cycles, the Balanced Plan recommends targeted growth in certain gateways and nodes. Additionally, in order to achieve sustainability and connectivity principles, the plan recommends focusing growth in major transportation corridors. A visual preference survey was conducted at Community-wide Workshop #2, which was attended by 59 participants. The purpose of the visual preference survey was to collect information from the community on urban design concepts related to streetscapes, mobility enhancements, parks and plazas, buildings (including heights), and land uses (including residential densities). The visual preference survey was also provided in an online format and received 78 individual responses (137 participants total). The results of the visual preference survey indicated a wide range of opinions ranging from no/controlled growth to some tolerance for growth along the major corridors targeted in the study. The majority of workshop and online participants (65 percent or more) preferred either mid-rise office or mixed use buildings (2-6 stories) or low rise commercial buildings (1-2 stories), and a mid-rise commercial district on the Vallco site (2-6 stories). Through the outreach process, community feedback indicated that a certain level of comfort existed with taller heights in certain areas in the City. Heights in the Balanced Plan are generally lower than those studied in Alternative B. Additionally, consistent with the practice in the 2005 General Plan for the Vallco area, heights above the base height in key gateways and nodes require retail on the ground floor. Additional heights above that are specified in three nodes – N. De Anza Gateway (Cupertino Inn), N. Vallco Gateway West (Kimco and hotel area near Hwy 280), and the Vallco area (Vallco Shopping District to the east of Wolfe Road and South Vallco - north of Vallco Parkway) with the provision of community benefits. In addition, the recommendation is to keep the Building Planes along all arterials at 1:1. Currently, the only area not consistent with this is in the South and North Vallco areas along Homestead Road and Stevens Creek Boulevard. The recommendation will keep a consistent building streetscape along the street. No changes are recommended to the 35-foot setback in the Heart of the City Special Area. Table 2 below provides a comparison of heights in Special Areas only where they are recommended to be changed. 19 12 Table 2– Heights & Densities In Special Areas Per Alternative Planning Area Existing GP Alt A PC Rec. Balanced Plan Alt B Alt C Heart of the City Special Area Oaks Gateway − 45 ft. − 25 du/ac − 30 ft. for Glenbrook No change No change Same as Alternative B − 45 ft.; or 60 ft. with retail − 25 du/ac − 35 du/ac if HE site − 60 ft.; or 75 ft. with retail − 25 du/ac − 35 du/ac if HE site Glenbrooks site − 30 ft. − 20 du/ac No change − 45 ft. − See HE topic for density No change No change No change North Crossroads Node − 45 ft. − 25 du/ac No change Same as Balanced Plan − 45 ft.; or 60 ft. with retail − 25 du/ac − 35 du/ac if HE site − 45 ft.; or 60 ft. with retail − 35 du/ac − 60 ft.; or 75 ft. with retail − 40 du/ac City Center − 45 ft. − 25 du/ac No change No change Same as Alternative B − 60 ft.; or 75 ft. with retail; or 90 ft. with community benefits on specific sites − 25 du/ac − 75 ft.; or 90 ft. with retail; or 110 ft. with community benefits on specific sites − 25 du/ac South Vallco Park − 45 ft.; or 60 ft. with retail − 35 du/ac No change No change No change − 60 ft.; or 75 ft. with retail; or 110 ft. with community benefits − 35 du/ac − 75 ft. or 90 ft. with retail; or 160 ft. with community benefits − 35 du/ac Vallco Shopping District Special Area East of Wolfe Road − 45 ft.; or 60 ft. with retail − 35 du/ac No change − 60 ft.; or 75 ft. with retail − 35 du/ac − 60 ft.; or 75 ft. with retail; or 90 ft. with community benefits − 35 du/ac − 60 ft.; or 75 ft. with retail; or 110 ft. with community benefits − 35 du/ac − 75 ft.; or 90 ft. with retail; or 160 ft. with community benefits − 35 du/ac West of Wolfe Road − 45 ft.; or 60 ft. with retail − 35 du/ac No change No change − 45 ft.; or 60 ft. with retail; or 75 ft. with community benefits for a 200 ft. depth along the Wolfe Rd prop. line and set back 200 ft. from Stevens Creek Blvd prop. line − 35 du/ac − 45 ft.; or 60 ft. with retail; or 75 ft. with community benefits along Stevens Creek and Wolfe − 35 du/ac − 60 ft.; or 75 ft. with retail; or 85 ft. with community benefits along Stevens Creek and Wolfe − 35 du/ac 20 13 Table 2– Heights & Densities In Special Areas Per Alternative Planning Area Existing GP Alt A PC Rec. Balanced Plan Alt B Alt C N. De Anza Blvd Special Area − 45 ft. − 25 du/ac No change Same as Alternative B Same as Alternative B − 60 ft. − 25 du/ac − 75 ft. − 25 du/ac Homestead Special Area North De Anza Gateway (Cupertino Inn) − 45 ft. − 35 du/ac No change − 45 ft.; or 60 ft. with retail; or 90 ft. for a hotel and 500-person convention center − 35 du/ac − 45 ft.; or 60 ft. with retail; or 90 ft. for hotel and major convention center with community benefits − 35 du/ac − 60 ft.; or 75 ft. with retail; or 95 ft. with community benefits − 35 du/ac − 60 ft.; or 75 ft. with retail; or 145 ft. with community benefits − 35 du/ac Stelling Gateway (east of Stelling) − 45 ft. − 35 du/ac No change No change Same as Alternative B − 45 ft.; or 60 ft. with retail − 35 du/ac − 45 ft.; or 60 ft. with retail − 35 du/ac North Vallco Park Special Area N. Vallco Gateway (west of Wolfe Rd.) − 60 ft. − 25 du/ac No change No change − 60 ft.; or 90 ft. for a 200 ft. depth along Wolfe Rd prop line for hotel & major convention center with community benefits − 25 du/ac − 60 ft.; or 75 ft. with retail; or 95 ft. with community benefits − 25 du/ac − 60 ft.; or 75 ft. with retail; or 145 ft. with community benefits − 25 du/ac N. Vallco Gateway (east of Wolfe Rd. – Hamptons site) − 60 ft. − 25 du/ac No change Same as Balanced Plan − 99 du/ac if HE site − 75 ft.; 60 ft. for buildings within 50 ft. of prop. lines abutting Wolfe Rd, Pruneridge Ave & Apple Campus 2 site. − 25 du/ac − 65 du/ac if HE site − 60 ft.; or 75 ft. with retail; or 95 ft. with community benefits − 65 du/ac − 60 ft.; or 75 ft. with retail; or 145 ft. with community benefits − 110 du/ac South De Anza Boulevard Special Area Two parts: S. De Anza Blvd − 30 ft. − 25 du/ac S. Sunnyvale- Saratoga − 30 ft. − 15 du/ac. Merge into one area for South De Anza Boulevard − 30 ft. − 25 du/ac Same as Balanced Plan (see HE for density for HE site) Same as Alternative A Same as Alternative A Same as Alternative A 21 14 Table 2– Heights & Densities In Special Areas Per Alternative Planning Area Existing GP Alt A PC Rec. Balanced Plan Alt B Alt C Summerwinds HE Site − 30 ft. − 5-15 du/ac − 30 ft. − 25 du/ac − 45 ft. (see HE for density) No change Same as Alternative A Same as Alternative A Building planes along arterials 1:1 along all arterials 1:1.5 (S. Vallco along Stevens Creek Blvd & N. Vallco along Homestead Rd.) No change Same as Balanced Plan Same as Alternative B 1:1 along all arterials (No change to Heart of the City landscape easement setback of 35 ft.) Same as Alternative B Planning Commission Recommendation – The Planning Commission recommended changes in the North Crossroads Node, North De Anza Special Area, Vallco Shopping District (E. of Wolfe Road), North De Anza Gateway (Cupertino Inn), and at the Hamptons, Glenbrooks Apartments and Summerwinds/Granite Rock sites. Details are provided in the table above. Densities are discussed in the Housing Element sites discussion. Key Question 5: Building Heights 1. What should building heights be in the Special Areas? Vallco Shopping District The Vallco Shopping Center has always been envisioned as a regional shopping destination and a key revenue generator for Cupertino. The mall, which was originally constructed between 1974 and 1979 functioned as a regional shopping destination and a source of revenue for the City. As discussed in the Retail Strategy Report (Attachment Q), the emptying of the mall continued from the 1990’s into the mid 2000’s. Due to reasons including the fractured property ownership, operating restrictions easement agreements, and the competitive nature of regional mall operation, leasing, and management, Vallco Mall was unable to compete with the larger and more sophisticated operators of Stanford and Valley Fair. Incomplete development, defaults from prior ownerships, prolonged and unrealized redevelopment plans, management changes, and other setbacks have exacerbated the situation. To solicit community input and ideas about the future of the Vallco Shopping Mall site, the City developed an interactive mapping exercise that allowed participants to create future designs for the area. A total of 24 groups developed a plan for the future of the Vallco Shopping District during four workshops and meetings (Community-wide Workshop #2, a Neighborhood meeting, a Chamber of Commerce meeting, and a Neighborhood Block Leaders meeting). In addition, an online survey included the Vallco mapping exercise, which was completed by 78 22 15 people. Throughout the outreach process, there was a consistent message from the community - to make Vallco a shopping, entertainment and dining destination and gathering place. Ideas for the area ranged from a re-tenanting and façade improvement program to re-imagining the site as a mixed-use pedestrian-oriented "town center-style" project. The "re-tenanting with minimal change" option was preferred by neighborhood groups near the shopping center due to concerns related to height and traffic impacts. However, a majority of groups (15 of the 24) at the workshops felt that it would be acceptable to add a mix of uses, including residential, hotel and office in the shopping district. In addition, a majority of the individual responses (50% or higher) from the online survey indicated a desire to add a mixed of residential, hotel and office uses in the shopping district so long as they were away from existing residential neighborhoods (e.g., on areas of the Vallco site closer to Interstate 280). Overall, the majority of participants (workshops and online) wanted parks, plazas, art exhibits in attractive outdoor areas, and pedestrian, bicycle, transit, traffic and safety improvements to the area given the potential increase in traffic to the area. The Retail Strategy outlined options for the Vallco Shopping Center including re-imagining the site as a “downtown” or “town center” with a mix of retail, hotel, office and residential uses. The other option included reducing and relocating the retail portion to the west side and opening the east side up to redevelopment with office, hotel and residential uses. The City has two basic options for the Vallco Shopping District with a variety of options in between. 1. Keep Existing General Plan Land Use and Zoning – The 2005 General Plan encourages redevelopment as a mixed-use site with residential and retail uses. However, the zoning, which is a combination of General Commercial (CG) and Planned Regional Shopping does not currently allow residential or office uses. As discussed in the Retail Strategy Report, retail rents alone will not attract the kind of investment needed to adapt the center to the changing needs of today’s retail environment. Therefore, without the introduction of other more profitable uses, such as office or residential, the center will most likely continue to deteriorate. The City’s goals of economic and fiscal stability and providing a cohesive and vibrant, shopping, dining and entertainment destination are not likely to be met. 2. Revising the General Plan Land Use to add office use and Zoning to add office and residential use – the inclusion of office and residential uses along with a substantial retail/entertainment component would help to create a vibrant, high-quality, community gathering place, and entertainment and lifestyle shopping destination. However, partial redevelopment has not been successful in the past. Therefore, a successful development strategy for the site will have to include: complete redevelopment of the site, a Master Developer, and adoption of a Specific Plan with phasing and infrastructure improvements, and a “Town Center” format. Based on the Retail Strategy Report, a successful mix of uses would include 500,000-600,000 square feet of retail with a mix of residential, hotel and up to 2,000,000 square feet of office use. The Draft General Plan (Community Vision 2040) recommends a minimum of 600,000 square feet of retail (30% of which can be entertainment use), 600 units, 375 hotel rooms and about 1,000,000 square feet of office space for the Vallco Shopping District (as noted earlier, the Retail consultant 23 16 acknowledges that up to 2,000,000 square feet of office could be necessary to acquire and develop the site). Consistent with community feedback in the workshops, it recommends retaining current height limits on the portion of the site west of Wolfe Road, mid-range building heights closer to the freeway and away from neighborhoods, retention of trees along the perimeter, and neighborhood buffers in the form of setbacks and landscaping. Additionally, in order to address neighborhood concerns, the proposed Community Vision 2040 requires a Specific Plan for the area which will allow a robust community participation process prior to approval of a development project. This would allow the City to achieve community goals for a shopping and dining destination, economic and fiscal goals, and a portion of the City’s Housing Element requirement, while addressing neighborhood concerns related to development. Planning Commission recommendation – The Planning Commission agreed that Vallco Shopping District could be developed as a regional shopping destination with a mix of retail, entertainment, residential, office and hotel uses. However, they felt that a Specific Plan process with public input should be required before the final development allocations and uses on the site were approved. They liked the “Town Center” concept. They recommended the following changes to the policies in the proposed General Plan related to the Vallco Shopping District:  Remove minimum and maximum allocations; and  Include a mix of major retail with entertainment, residential, office, and a five-star hotel with a major convention center. Key Question 4: Vallco Shopping District Should the Vallco Shopping District continue to be envisioned as “town-center” with a mix of retail/entertainment, residential and office use in the General Plan? Other Revisions to the Land Use Designations The following changes are being recommended related to Land Use designations  PG&E site (Homestead Road east of Blaney Avenue) – The General Plan Land Use designation is recommended to be amended from Quasi-public/Institutional to Commercial/Quasi- Public/Institutional. While PG&E does not currently anticipate any changes to their current operations, they are not opposed to the change as long as it allows them to continue the use at the current site. The revised designation would allow PG&E to continue the use at the site, while allowing a future commercial opportunity, if PG&E chooses to sell it in the future.  Mirapath (Blaney Avenue) – As requested by the applicant and property owners, the General Plan Land Use designation on this site has been revised from Industrial to Commercial/Industrial. The amendment is being requested since the site is small and can’t incorporate industrial uses successfully. The amendment will allow the site to be used for commercial office and continue to allow light manufacturing uses.  Other Minor changes: Revisions to sites to ensure that the General Plan Land Use designations and zoning are consistent. Planning Commission Recommendation – Planning Commission recommended approval of these changes. 24 17 Housing Element Context In accordance with State law, General Plans in California cities must contain a Housing Element. For the current cycle, the updated Housing Element must be adopted by January 31, 2015 (plus a 120-day grace period). If this adoption deadline is met, the planning period for this cycle extends from adoption to January 31, 2023 (or eight years). Otherwise, the City must update the Housing Element again in 2019 (every four years). Housing Element Content Requirements The Housing Element is the City’s primary policy document regarding the development, rehabilitation, and preservation of housing for all economic segments of the population. Per State Housing Element law, the Housing Element must be periodically updated to:  Examine the local need for housing with a focus on special needs populations (Needs Assessment)  Analyze potential constraints to new housing production (Constraints Analysis)  Describe goals, policies and implementation programs to achieve local housing objectives (Housing Plan)  Outline the community’s housing production objectives consistent with State and regional growth projections per the Regional Housing Needs Allocation (RHNA) and identify adequate sites for the production of housing serving various income levels (Housing Resources)  Evaluate the Housing Element for consistency with other General Plan elements (Consistency with General Plan)  Evaluate accomplishments in implementing programs in the previously adopted 2007-2014 Housing Element, and evaluate the effectiveness and appropriateness of continuing these programs in the 2014-2022 Housing Element (Review of Previous Housing Element) A detailed discussion of these topics is provided in Attachment R – Housing Commission staff report dated August 28, 2014 Housing Resources & Regional Housing Needs Allocation (RHNA) One of the primary requirements of State Housing Element law pertains to the Regional Housing Needs Allocation (RHNA). The City of Cupertino’s RHNA allocation is 1,064 new housing units between 2014 and 2022. The City can take credit for a total of 62 units (30 units approved and 32 second units anticipated). As a result, the City has to identify sites for the construction of the balance or 1,002 units. HCD typically requires jurisdictions to provide a moderate surplus of units in case sites are not developed, or are developed at densities lower than those expected in the Housing Element. This is more so the case, when a good portion of a jurisdiction’s sites are in mixed-use zones that could be developed without residential uses or on developed sites. In the past, three of the 2007-2014 Housing Element sites were developed with non-residential uses (portion of Apple Campus 2, Kiddie Academy, and Saich Way Station). Based on past discussions with HCD and experience with Housing Elements for other jurisdictions, and since the majority of 25 18 the City’s sites are in mixed-use zones (approximately 68%), the City’s consultant recommends an additional 25-40 percent above the City’s remaining housing need or a total of 1,250-1,400 units. Draft 2014-2022 Housing Element The Draft 2014-2022 Housing Element (see Attachment C) draws strongly from the 2007-2014 Housing Element (see Attachment S). The input received after several community meetings (including stakeholder interviews in 2013, three community workshops/open houses, and four study sessions—outlined in more detail below under Public Noticing and Outreach), very closely reflects the input received during preparation of the previous Housing Element. As a result, the draft 2014-2022 Housing Plan reflects minimal changes from the 2007-2014 Housing Plan. A number of changes are recommended (most are for compliance with State and regional requirements). A detailed discussion of these is provided in the Housing Commission and Planning Commission staff reports (Attachments I and R). Items that may be of particular interest include:  Programs have been revised to ensure that the 2014-2022 Housing Element complies with State law. Specifically, programs were added to reflect amendments to the zoning ordinance related to density bonuses, emergency shelters, and farmworker and employee housing to comply with State law and to amend the Heart of the City Specific Plan to revise the method in which residential density is calculated in mixed-use developments;  Housing Mitigation Program: The City’s affordable housing program—the Housing Mitigation Program—has been amended to comply with recent litigation. A 2009 court-case (Palmer vs. the City of Los Angeles) has resulted in cities suspending or amending the portion of their Housing Mitigation program requiring affordable units to be included in market-rate rental developments.  Housing Preservation Program: The existing Rental Preservation Program has been amended to provide mitigation for impacts on displaced tenants in developments with four or more units. Housing Sites The Housing Commission, Planning Commission, and City Council have conducted multiple study sessions and community workshops to review potential housing sites to meet the RHNA. On April 1, 2014, the City Council authorized staff to prepare environmental review for three alternatives (A, B and C) for a maximum of nineteen (19) sites based on the criteria outlined below. On August 28, 2014, the Housing Commission recommended adoption of the Draft 2014-2022 Housing Element and the Low-High priority listing for the sites. HCD Criteria for Site Selection HCD reviews each Housing Element’s sites inventory to determine if adequate sites have been identified to meet the RHNA. Preparation of a “site suitability analysis” is an important step in addressing the adequate sites requirement. This analysis must demonstrate that identified sites can accommodate the housing needs—by income level—within the current planning period of the element (2014-2022). The criteria are listed below and discussed in detail in Attachment R – Housing Commission staff report dated August 28, 2014. Criteria include: 26 19  Existing Use on the Site  Realistic Potential for Recycling  Site Size and Ownership Patterns  Development Density (to meet the minimum affordability criteria of 20 units/ac at 85% of maximum density) Other Criteria for Site Selection In addition to the State-wide criteria, Plan Bay Area – the region’s Sustainable Communities Strategy (discussed earlier) contributes additional criteria regarding what makes a desirable housing site in the ABAG region. The City’s General Plan policies are generally consistent with the strategies in the Plan. In addition, criteria, consistent with the City’s 2005 General Plan, have also been identified in order to ensure functional and attractive development occurs on the sites selected. Key themes include:  Locate development along major transportation routes with access to transit or within ½ mile of a VTA Priority Development Area (PDA).  Locate higher density housing in closer proximity to employment and activity centers  Corner lot(s) with large frontage preferred – such parcels provide the most flexibility to accommodate mixed-use developments and avoid impeding parking and connectivity between mid-block parcels  Incentive for redevelopment –Sites with older, under-performing retail shopping centers have also been evaluated as to whether housing or office would be necessary to provide an incentive to improve higher-quality retail. Housing Element Sites While all 19 sites have been studied for potential impacts in the EIR, 18 sites were available for selection for the Planning Commission. This is because the largest property owner, Valley Church, associated with Site 17 (IntraHealth/ Office/Tennis Courts) sent the City a letter expressing their desire to not be included in the Housing Sites Inventory shortly after the City authorized study of the 19 sites. The remaining sites were prioritized by how well they meet the criteria outlined above. After the Planning Commission meetings in October 2014, the City received letters, from the property owner for two parcels, which comprise the bulk, of Site 19 (Cypress Building/Hall property), the property trustee for China Dance, which constitutes a small portion of EIR Site 1 (Shan Restaurant, Q-Mart and China Dance) and the property owner of Arya Restaurant, representing approximately 40% of EIR Site 2, requesting removal of their parcels from consideration for the Housing Element. Staff recommends removal of Site 19 from the Housing Element Priority List due to the reduced size of the resulting parcels; recommends reducing the size of Site 1 by eliminating the China Dance parcel since the size of the resulting site is not greatly reduced. EIR Site 2 was already recommended for Removal in the Balanced Plan (see Priority No. 15 below) and is also not part of the Planning Commission’s recommendation (see Table 4.) 27 20 Table 3 below shows the Recommended (High priority) and alternate Housing Element (Moderate and Low-Moderate priority) sites listed in the Balance Plan. Sites that score low in meeting the criteria are recommended to be removed from the Alternate Housing Sites list. A detailed table of all sites is provided in Attachment T. It should be noted that the density of the sites in Alternative A, even if all of them were included, does not meet the upper end of the 25-40% surplus (1,250- 1,400 units) recommended to meet the remaining RHNA. The densities recommended in the Balanced Plan are based on the following goals:  Provide densities for existing sites that allow enough of an incentive to assume that the sites would be developed in the 2014-2022 period (HCD criterion).  Meet affordability HCD criterion (minimum 20 du/ac at 85% of maximum density; ~ 25 du/ac).  Ensure that there are enough sites for future housing elements. TABLE 3 Priority No. Site Name Existing Zoning Priority (meets criteria) Density & Capacity at 85% & 100% & Proposed Zoning Alternative A Balanced Plan Alternative B Alternative C Recommended Housing Element Sites 1. The Oaks P(CG) High 25 du/ac 0 du No change 35 du/ac 235 du @ 85% 276 du @ 100% Same as Alt B 35 du/ac 235 du @ 85% 276 du @ 100% P(CG, Res) 35 du/ac 235 du @ 85% 276 du @ 100% Same as Alt B 2. Vallco Shopping District (west) P(CG), P(Regional Shopping) High 35 du/ac 0 du P(Regional Shopping) 35 du/ac 600 du 1,179 du @ 100% Same as Alt B 35 du/ac 600 du 1,179 du @ 100% P(Regional Shopping, MP, Res) 35 du/ac 800 du 1,179 du @ 100% Same as Alt B 3. Hamptons 342 du existing P(Res – 70) High 25 du/ac 0 du Same as Alt B 65 du/ac 344 du add @ 85% 404 du add @ 100% Same as Alt B 65 du/ac 344 du add @ 85% 404 du add @ 100% P(Res) 110 du/ac 820 du add @ 85% 1,026 add @ 100% Same as Alt B 4. United Furniture + other P(CG, Res) High 25 du/ac 103 du @ 85% 121 du @ 100% No change 25 du/ac 103 du @ 85% 121 du @ 100% No change 25 du/ac 103 du @ 85% 121 du @ 100% No change 25 du/ac 103 du @ 85% 121 du @ 100% No change 5. Barry Swenson P(CG, Res) High 25 du/ac 11 du @ 85% 13 du @ 100% No change 25 du/ac 11 du @ 85% 13 du @ 100% No change 25 du/ac 11 du @ 85% 13 du @ 100% No change 25 du/ac 11 du @ 85% 13 du @ 100% No change 6. Glenbrooks Apts 517 du existing R3(10-20) High 20 du/ac** 93 du add @ 85% 109 du add @ 100% No change 20 du/ac** 93 du add @ 85% 109 du add @ 100% No change 20 du/ac** 93 du add @ 85% 109 du add @ 100% No change 20 du/ac** 93 du add @ 85% 109 du add @ 100% No change Recommended Sites Total at 85% 207 du 1,386 du 1,386 du 2,062 du 28 21 Priority No. Site Name Existing Zoning Priority (meets criteria) Density & Capacity at 85% & 100% & Proposed Zoning Alternative A Balanced Plan Alternative B Alternative C Alternate Housing Element Sites 7. Marina Plaza P(CG, Res) Mod. 25 du/ac 145 du @ 85% 171 du @ 85% No change 35 du/ac 204 du @ 85% 240 du @ 100% No change 35 du/ac 204 du @ 85% 240 du @ 100% No change 40 du/ac 232 du @ 85% 274 du @ 100% No change 8. Stevens Creek Office P(CG, Res) Mod. 25 du/ac 134 du @ 85% 157 du @ 100% No change 35 du/ac 187 du @ 85% 220 du @ 100% Same as Alt B 35 du/ac 187 du @ 85% 220 du @ 100% P(CG, OP, Res) 40 du/ac 214 du @ 85% 252 du @ 100% Same as Alt B 9. Cypress @ Finch Ave. P(CG, Res) Mod. 25 du/ac 105 du @ 85 % 124 du @ 100% No change 25 du/ac 105 du @ 85 % 124 du @ 100% No change 25 du/ac 105 du @ 85 % 124 du @ 100% No change 25 du/ac 105 du @ 85 % 124 du @ 100% No change 10. Loree Center P(CG, Res) Low- Mod. 25 du/ac 27 du @ 85% 32 du @ 100% No change 25 du/ac 27 du @ 85% 32 du @ 100% No change 25 du/ac 27 du @ 85% 32 du @ 100% No change 25 du/ac 27 du @ 85% 32 du @ 100% No change 11. Homestead Lanes+ Adj. P(CG)/P(Rec, Ent) Low- Mod. 35 du/ac 0 No change 35 du/ac 151 du @ 85% 178 du @ 100% Same as Alt B 35 du/ac 151 du @ 85% 178 du @ 100% P(CG, Res) 35 du/ac 151 du @ 85% 178 du @ 100% Same as Alt B 12. Summerwinds/ Granite Rock/ Jack in the Box P(CG, Res 5-15) Low- Mod. 25 du/ac 96 du @ 85% 114 du @ 100% P(CG, Res) 25 du/ac 96 du @ 85% 114 du @ 100% Same as Alt A 25 du/ac 96 du @ 85% 114 du @ 100% Same as Alt A 40 du/ac 154 du @ 85% 182 du @ 100% Same as Alt A 13. Shan and Q Mart** P(CG, Res) Low- Mod. 25 du/ac 33 du @ 85% 39 du @ 100% No change 25 du/ac 33 du @ 85% 39 du @ 100% No change 25 du/ac 33 du @ 85% 39 du @ 100% No change 25 du/ac 33 du @ 85% 39 du @ 100% No change Alternate Sites Total at 85% 435 du 698 du 698 du 811 du Sites Recommended for Removal 14. Villages 468 du existing R3 Low 20 du/ac*** 62 du @ 85% 74 du @ 100% No change 20 du/ac*** 62 du @ 85% 74 du @ 100% No change 20 du/ac*** 62 du @ 85% 74 du @ 100% No change 20 du/ac*** 62 du @ 85% 74 du @ 100% No change 15. Arya/ Scandinavian P(CG, Res) Low 25 du/ac 58 du @ 85% 68 du @ 100% No change 25 du/ac 58 du @ 85% 68 du @ 100% No change 25 du/ac 58 du @ 85% 68 du @ 100% No change 25 du/ac 58 du @ 85% 68 du @ 100% No change 16. Foothill Market @ McClellan P(CG) Low 15 du/ac*** 0 No change 25 du/ac 27 du @ 85% 32 du @ 100% Same as Alt C 15 du/ac* 0 du No change 25 du/ac 27 du @ 85% 32 du @ 100% P(CG, Res) 29 22 Note: * Separate parcels on a Housing Element site shall be combined, master planned and developed under a Master Developer. ** Data has been updated to eliminate China Dance Studio. This site was formerly ranked #10 *** Indicates that site will not meet affordability criteria at Realistic capacity (85% of max.) Totals for all sites exclude sites that have requested removal Planning Commission recommendation - see Table 4 below TABLE 4 Planning Commission Recommended Housing Element Sites & Alternates Priority No. Site Name Existing Zoning Priority Density & Capacity at 85% & 100% & Proposed Zoning a Comments Recommended Housing Element Sites 1. The Oaks P(CG) High 150 du maximum recommended – results in approximately 19 units/ac 19 units/ac does not meet HCD’s affordability criteria. The density may not be adequate to revitalize the site with a large retail component. However, a density of 25 du/ac may allow provision of a retail component. 167 du @ 85% 197 du @ 100% 2. Hamptons (342 units existing) P(Res)-70 High 748 du add. @ 85% 889 du add. @ 100% 99 du/ac - P(Res) 3. United Furniture + other P(CG, Res) High Same as Balanced Plan 25 du/ac 103 du @ 85% 121 du @ 100% 4. Barry Swenson P(CG, Res) High Same as Balanced Plan 25 du/ac 11 du @ 85% 13 du @ 100% Priority No. Site Name Existing Zoning Priority (meets criteria) Density & Capacity at 85% & 100% & Proposed Zoning Alternative A Balanced Plan Alternative B Alternative C 17. Bateh Bros. P(CG) Low 15 du/ac* 0 du No change 25 du/ac 14 du @ 85% 16 du @ 100% Same as Alt C 15 du/ac* 0 du No change 35 du/ac 19 du @ 85% 23 du @ 100% P(CG, Res) 18. Carl Berg P(CG, ML, Res) Low 25 du/ac 169 du @ 85% 199 du @ 100% No change 25 du/ac 169 du @ 85% 199 du @ 100% No change 25 du/ac 169 du @ 85% 199 du @ 100% No change 25 du/ac 169 du @ 85% 199 du @ 100% No change Removed Sites Total at 85% 231 du 272 du (Remove) 231 du 277 du Total Units on All Sites 873 du 2,356 du (2,084 du not incl. Low priority) 2,315 du 3,150 du 30 23 TABLE 4 Planning Commission Recommended Housing Element Sites & Alternates Priority No. Site Name Existing Zoning Priority Density & Capacity at 85% & 100% & Proposed Zoning a Comments 5. Glenbrooks (517 units existing) R3(10-20) High 28 du/ac (300 additional recommended) 306 du @ 85% 360 du @ 100% Increase building heights from 30 feet to 45 feet Building an additional 300 units will require tearing down existing units. The increase in density from 20 du/ac to 28 du/ac will likely not be sufficient incentive to do so. The current R3 zoning district allows a maximum density of 20 units/acre for the site. A density of 28 units/acre will require a new zoning district, with increased density and height, and potentially reduced setbacks. See additional staff comment on EIR. 6. Summerwinds/Granite Rock/Jack in the Box P(CG, Res 5-15) Low- Mod 25 du/ac 96 du @ 85% 114 du @ 100% Increase building heights from 30 feet to 45 feet P(CG, Res) Recommended Sites Total @ 85% 1,408 du Alternate Housing Element Sites 7. Villages (468 units existing) R3 Mod Same as Balanced Plan 20 du/ac 62 du add. @ 85% 72 du add. @ 100% 8. Marina Plaza P(CG, Res) Mod Same as Balanced Plan 35 du/ac 204 du @ 85% 240 du @ 100% 9. Carl Berg P(CG, Res) Low- Mod. Same as Balanced Plan 25 du/ac 169 du @ 85% 199 du @ 100% Alternate Sites Total @ 85% 435 du Notes: a. Projects up to 100% of the maximum density may be proposed. Any units above 85% of the maximum density would have to obtain a Conditional Use Permit. Staff Comments – The Planning Commission recommended 300 units be assigned to the Glenbrook Apartments site and 150 units to the Oaks site. However, upon consultation with the EIR consultant, it has been determined that a maximum of 50 units over and above the maximum units studied in the EIR can be added to the Oaks and Glenbrooks area without triggering additional traffic analysis and environmental review. Based on the Planning Commission recommendation of providing 150 units to the Oaks site, the most that could be added to the Glenbrooks area could be an additional 228 units (max studied in the EIR +50 = 31 24 378-150 for Oaks). In addition, the site would need a General Plan designation and zoning change to ensure that the units proposed for the site can be accommodated. The current General Plan designation of Medium Residential (10-20 du/ac) would have to be changed to Medium/High (20-35 du/ac) and a new R3-type zoning district would have to be created to accommodate a higher density and taller heights. This would require additional time and analysis. Therefore, the findings for the Planning Commission recommendation can only support a maximum of 228 units without additional environmental review. This number falls short of the desired Housing Elements sites count by 72 units. The final list of recommended Housing Element sites will be incorporated in the Draft Housing Element prior to forwarding to the HCD. In addition, the alternative Housing Element sites list will be maintained, in case, one or more of the sites are not approved by HCD after discussions with them. If sites have to be replaced in the Final 2014-2022 Housing Element with sites from the Alternate Housing Element Sites list, any necessary amendments to the General Plan Land Use designations and zoning will be presented with the Final 2014-2022 Housing Element in Spring 2015. General Plan and Zoning Approach for Housing Element sites General Plan Land Use Designation – The General Plan Land Use Map will identify the base land use standards recommended in the Balanced Plan. Housing Element sites will have an overlay with the higher densities and height standards on the General Plan Land Use map. The development standards will be effective per the zoning schedule described below. Recommended Housing Element sites that require an amendment to the General Plan Land Use designation include: the Hamptons, and the Oaks (increased densities). Housing Element sites recommended by the Planning Commission that would require an amendment to the General Plan Land Use designation include: Glenbrooks, Summerwinds etc. and Hamptons (increased densities and heights, as previously discussed). Zoning Map Amendment – The Zoning Map amendments are scheduled to go into effect on the date the Final Housing Element gets adopted. If changes are needed to the Housing Element sites list based on HCD review, the revisions to the Zoning Map will be presented concurrent with the adoption of the Final 2014-2022 Housing Element in Spring 2015. Recommended Housing Element sites in the Balanced Plan that would require a zoning change to add residential use include: the Oaks, and Vallco Shopping District. The Hamptons will require a rezoning from P(Res)-70 (unclear how this differs from Planned Residential) to P(Res) or Planned Residential. Housing Element sites recommended by the Planning Commission that would require zoning changes include: the Oaks to add residential use, and Glenbrooks, Summerwinds and Hamptons (increased densities). Key Question 5: Housing Element Sites 1. Approve a list of Housing Element sites and densities to meet the RHNA and HCD requirements. 2. Approve a prioritized Alternative Sites List. 32 25 SUMMARY OF AMENDMENTS A summary of General Plan Land Use and Zoning designations and Municipal Code text amendments is provided in Attachment U. The attached resolutions (Attachments B – E) provide additional details on the changes to General Plan Land Use, Zoning designation, the Municipal text and Specific Plan Amendments. Attachment V is a redlined version of the zoning text amendments and contains minor edits in Chapter 19.12, Administration, to conform to the California Government Code, which were not reflected in the Planning Commission resolution. Attachment W is a redlined version of the Specific Plan Amendments to the Heart of the City Specific Plan. ENVIRONMENTAL IMPACT REPORT (EIR) The California Environmental Quality Act (CEQA) requires that all State and local governments consider the physical changes that result as a consequence of projects over which they have discretionary authority. The purpose of the EIR is not to recommend approval or denial of a project but to provide information to be used in the planning and decision‐making process. CEQA requires decision makers to balance the benefits of a proposed project against the significant environmental effects, along with other factors. The attached Planning Commission Study Session staff report (Attachment X) and City Council Study Session staff report (Attachment Y) provides a detailed discussion of the EIR. A brief discussion of the issues is provided below. Proposed Project Alternative C was identified as the CEQA “project” because it was the alternative with the greatest development potential and therefore, the possibility of the greatest environmental effects. CEQA requires that alternatives to the Proposed Project should avoid or substantially lessen one or more significant impacts of the project. A discussion of Alternative C has already been provided earlier in this report. EIR Alternatives CEQA requires the analysis of a range of reasonable alternatives to a proposed project that would feasibly attain most of the project's basic objectives and avoid or substantially lessen any of the significant effects of the project. As noted earlier, the following alternatives were studied.  No Project Alternative - The CEQA-required No Project alternative assumes that the Draft General Plan would not be adopted or implemented and assumes the full implementation (by 2040) of development envisioned under the 2005 General Plan.  Alternative A – Discussion provided earlier in this report.  Alternative B – Discussion provided earlier in this report. Impacts The following environmental topics are addressed in the EIR. The EIR and the Planning Commission and City Council staff reports on the EIR study sessions discuss the impacts related to the CEQA Project (Alternative C) and the other alternatives in detail. Table 4 below outlines the impact in each environmental topic for the Proposed Project and alternatives. 33 26 TABLE 4 Topic Proposed Project (Alternative C) No Project Alternative A Alternative B Aesthetics LTS LTS LTS LTS Air Quality SU SU SU SU1 Biological Resources LTS/M LTS/M LTS/M LTS/M Cultural Resources LTS LTS LTS LTS Geology, Soils & Mineral Resources LTS LTS LTS LTS GHG Emissions LTS LTS LTS LTS Hazards & Hazardous Materials LTS/M LTS/M LTS/M LTS/M Hydrology & Water Quality LTS LTS LTS LTS Land Use & Planning LTS LTS LTS LTS Noise SU SU SU SU Population & Housing LTS LTS LTS LTS Public Services & Recreation LTS LTS LTS LTS Transportation & Traffic SU SU SU SU Utilities & Infrastructure LTS/M LTS/M LTS/M LTS/M Notes: LTS - Less-than-significant impact; LTS/M - Less-than-significant with mitigation; SU - Significant and unavoidable. 1. In Alternative B, one impact (AQ-1) is LTS. As noted above, the level of impacts in the Proposed Project as well as all three alternatives analyzed show the same level of impacts within each resource category as a whole, but in varying degrees. This is partly due to the fact that the EIR studied impacts of the buildout of the Proposed Project and alternatives over a 25-year period as well as the cumulative regional build-out plans. The results indicate that the difference between the impacts of the various alternatives is not very significant, in the context of the cumulative impacts of regional plans over a 25-year period. In general, the EIR finds significant and unavoidable impacts to Noise, Air Quality and Transportation and Traffic related to the Proposed Project and alternatives. In some cases, the significant impacts have been determined to be significant and unavoidable because the mitigation measures require approval from a governmental agency other than the City of Cupertino (e.g. Caltrans), are not within the responsibility and jurisdiction of the City, and need approval from the other agencies for implementation. In other cases, a significant impact is unavoidable because the significant impact would not be fully mitigated even though mitigation measures have been identified and would be implemented. Draft EIR and Final EIR The Draft EIR was released on June 18, 2014 and was circulated for 45 days until August 1, 2014. A meeting was held on June 24, 2014 to solicit written comments from the public related to the EIR. Responses to comments received during the 45-day public review period were included in the 34 27 Responses to comments (RTC) document published as part of the Final EIR on August 28, 2014. The Final EIR comprises of the Draft EIR (Attachment Z), the Response to Comments (RTC) Document (Attachment AA), and the Supplemental Text Revisions Memo dated November 3, 2014 (Attachment BB). The Response to Comments must be made available to all agencies that commented during the public review period of the Draft EIR for at least 10 days before final action is taken per CEQA requirements. The City will meet this obligation since final action on the project will not take place until November 2014. Comments were also received after the close of the EIR public review period on August 1, 2014. While CEQA does not require that the City respond to the comments received after the close of the public review period, staff has been and will continue to provide responses to these comments. As of October 31, 2014, 34 late comment letters (and attachments) were received. Responses to these have been compiled in a late comment memo (Attachment BB.) The comment letters received during and after the close of the comment period did not concern new or substantially more severe significant impacts, mitigation measures, or project alternatives, or change the findings of the Draft EIR. The Planning Commission and City Council held EIR study sessions on September 9, 2014 and October 7, 2014, respectively. The study sessions were a forum for questions related to the EIR and no decisions were made. The Environmental Review Committee reviewed the EIR at its meeting on October 2, 2014, determined that it was adequate, and recommended that the City Council certify the Final EIR (Attachment CC). Balanced Plan The Development Allocation recommendations in the Balanced Plan are generally between Alternatives B and C. However the recommended heights are similar to or lower than those studied in Alternative B. The Balanced Plan provides a better balance of land uses than the Proposed Project or any of the other alternatives due to the fact that the (office/commercial to residential) balance is better than that in Alternative B, which had the lowest VMT of all of the alternatives studied in the EIR. However, it will continue to have significant avoidable impacts for traffic, air quality and noise even after incorporation of all feasible mitigation measures. Planning Commission Recommendation – The Planning Commission recommended Certification of an Environmental Impact Report, adoption of Findings and a Statement of Overriding Considerations, and adoption of Mitigation Measures and a Mitigation Monitoring and Reporting Program, per Planning Commission Resolution (Attachment A). Findings and Statement of Overriding Considerations CEQA requires the lead agency to make certain specified findings when it approves a project for which an EIR has been certified that identified one or more significant effects on the environment. Public Resources Code § 21081. CEQA Findings that address approval of the Planning Commission Recommendation, as modified to address feasibility, are Attachment A. Alternate CEQA findings that address approval of the Balanced Plan Project are reflected in Attachment H. 35 28 As part of the CEQA findings, CEQA requires the decision-making agency to balance the economic, legal, social, technological or other benefits of a project against its unavoidable risks when determining whether to approve a project. If the specific economic, legal, social, technological or other benefits of the project outweigh the unavoidable adverse environmental effects, those effects may be considered acceptable and the agency may determine that the significant unavoidable impacts are outweighed by the proposed project's benefits. CEQA requires the agency to support, in writing, the specific reasons for considering a project acceptable when significant impacts are not avoided or substantially lessened. The Balanced Plan (Community Vision 2040) would result in significant unavoidable impacts related to transportation, air quality and noise, even after incorporation of all feasible mitigation measures. However, it would achieve community goals related to a balance of land uses, providing active and vibrant shopping and entertainment destinations, and economic and fiscal stability. In addition, the Plan would help ensure that regional targets for greenhouse gas emissions and housing are met, encourages sustainable planning and practices, and would concentrate growth in major transportation corridors and in employment centers and key Nodes and Gateways, while maintaining community goals of neighborhood preservation and connectivity. These significant unavoidable impacts and project benefits are discussed in the CEQA Findings and Statement of Overriding Considerations (Attachment H). The Planning Commission recommendation would result in reduced VMT beyond that in Alternative A but slightly lower than the Balanced Plan. However, it would continue to have significant unavoidable impacts related to air quality, traffic and noise, generally between that in Alternative A and the Balanced Plan. It would also not help to achieve the City’s economic and fiscal goals since allocations (housing and office) would not be sufficient allow redevelopment of the Vallco Shopping District. These significant and unavoidable impacts and project benefits related to the Planning Commission recommendation are discussed in the CEQA Findings and Statement of Overriding Considerations (Attachment A). PUBLIC NOTICING AND WORKSHOPS Noticing for the General Plan and Housing Element project has been extensive, including the following:  Three postcards sent to every postal address in the City o One for General Plan Amendment o One combined for General Plan Amendment and Housing Element o One announcing availability of the Draft EIR  Newspaper notices  Notices sent to prospective housing element site property owners  Creation of a project website - notice of website updates and Workshop/meeting reminders e- mailed to about 300 website subscribers  E-mail list with close to 400 email addresses for interested parties maintained by City staff The following is a list of public meetings.  General Plan Amendment Community Workshop #1 – July 18, 2013 36 29  General Plan Amendment Community Workshop #2 – October 23, 2013  General Plan Amendment Neighborhood Meeting – December 5, 2013  Chamber of Commerce and Block Leader meetings – January 29, 2014  Meetings with Study Area property owners/representatives  Meetings with interested Housing Element site property owners/representatives  Chamber of Commerce Legislative Action Committee –December 6, 2013 & February 7, 2014  Commission Meetings, Open Houses, Meetings and Study Sessions o City Council Meeting for the initiation of the General Plan amendment project & contract – February 19, 2012 and March 5, 2012 o City Council Meeting for initiation of the Housing Element project, consultant selection and contract – November 4, 2013 o Presentation at Teen Commission Meeting – October 2, 2013 o Presentation at Bike and Ped. Commission Meeting – January 15, 2014 o Joint Housing Commission and Planning Commission Study Session and Community Workshop for Housing Element sites #1 – January 23, 2014 o Housing Commission Study Session and Community Workshop for Housing Element sites #2 – February 12, 2014 o Open Houses #1 and #2 – February 19, 2014 and September 16, 2014 o Planning Commission Study Session on Housing Sites for environmental review – February 19, 2014 o City Council Study Session on Housing Sites and land use alternatives for environmental review – March 3, 2014 o Housing Commission meeting on housing policy – March 19, 2014 o Joint Planning Commission/City Council meeting on housing and draft General Plan policy direction – April 1, 2014 o Public meeting for EIR – June 24, 2014 o Housing Commission Meeting – August 28, 2014 o Planning Commission Study Session on the EIR – September 9, 2014 o City Council Study Session on the EIR – October 7, 2014 o Planning Commission public hearings - October 14, 2014 and October 20, 2014 Public Comments Comments related to the Draft EIR have been discussed earlier in this report. In addition to comments received regarding the adequacy of the EIR, several comments were received on the project. The comments are briefly discussed in Attachment EE. NEXT STEPS Based on the City Council’s decision on November 10, 2014, necessary changes will be made to the findings for certification of the EIR, adoption of the General Plan (Community Vision 2040), and the zoning ordinances. In addition, conforming changes will also be made to the Draft Housing Element and alternative sites list prior consultation and review with HCD. A second reading for the zoning ordinances related to the General Plan and Housing Element is scheduled for November 18, 2014. The Community Vision 2040 General Plan and Heart of the City Specific Plan Amendment 37 30 will go into effect upon adoption, however, the zoning ordinance text and map amendments will go into effect 30 days after the November 18, 2014 second reading. The final General Plan document text, maps and graphics will then be formatted and prepared for posting by staff and the consultants. The Draft Housing Element will be forwarded to the State Department of Housing and Community Development (HCD) for their review, which is expected to take about 60 days. Staff will discuss outstanding items with HCD and discuss any necessary changes related to the Housing Element sites based on the prioritized and alternate sites list. Upon conclusion of HCD review, staff will present the Final 2014-20122 Housing Element for adoption to the Planning Commission and City Council. The density bonus law has recently been amended to provide, for applications received after January 1, 2015, that before a site can be considered for a density bonus, the project must include the replacement of all affordable rental housing and housing occupied by lower income households at any time in the five-year period preceding the density bonus application. In addition, the amendments require 55-year, rather than 30-year, affordability for rental housing receiving a density bonus and allow use of equity-sharing for lower income for-sale housing. These revisions will be included in the Housing Element and zoning ordinance prior to adoption of the Final 2014- 2022 Housing Element. Any related General Plan amendments or zoning map or code amendments related to the revised Housing Element sites list will be brought at the same time. State law requires agencies to adopt their 2014-2022 Housing Elements by May 31, 2015. ____________________________________________________________________________ Prepared by: Piu Ghosh, Senior Planner Reviewed by: Gary Chao, Assistant Director of Community Development Approved for Submission by: Aarti Shrivastava, Assistant City Manager Attachments: A. Draft Resolution 14-210, Recommending Certification of an Environmental Impact Report, adoption of Findings and a Statement of Overriding Considerations, and adoption of Mitigation Measures and a Mitigation Monitoring and Reporting Program, (EA-2013-03) B. Draft Resolution 14-211 adopting General Plan and Land Use Map Amendments (GPA-2013- 01) C. Draft Resolution 14-212 to authorize staff to forward the Draft 2014-2022 Housing Element to the State Department of Housing and Community Development (HCD) and use the prioritized list of Alternative Housing Element sites (GPA-2013-02) D. Draft Ordinance 14-2124 to approve Zoning Map Amendments (Z-2013-03) E. Draft Ordinance 14-2125 to approve Municipal Code Amendments (MCA-2014-01) F. Draft Resolution 14-213 to approve Specific Plan Amendment (SPA-2014-01) 38 31 G. Planning Commission resolutions 6760 – 6765 (The exhibits attached to the Planning Commission resolutions have not been attached to Attachment G. These are available online at www.cupertino.org/records under Planning Commission Agenda Packet for October 14, 2014.) H. Alternate CEQA Findings for Balanced Plan Recommendation I. Planning Commission staff report dated October 14, 2014 J. General Plan Amendment and Housing Element staff reports for: January 23, 2014 Housing Commission, February 12, 2014 Housing Commission, February 19, 2014 Planning Commission, March 4, 2014 City Council, April 1, 2014 Joint Planning Commission/City Council K. Concept Alternative Maps L. Planning Commission public hearing minutes October 14, 2014 and October 20, 2014 M. General Plan and Housing Element errata since Planning Commission recommendation on October 20, 2014 N. Balanced Plan Allocation, Heights and Density Map O. Planning Commission Recommended Allocation, Heights and Density Map P. Market Study dated February 13, 2014 prepared by BAE Urban Economics Q. Retail Strategy Report dated March 6, 2014 prepared by Greensfelder Commercial Real Estate LLC R. Housing Commission staff report dated August 28, 2014 S. 2007-2014 Housing Element and Technical Appendix T. Site Priority List with criteria U. Summary Of Land Use Map, Zoning Map And Zoning Text Amendments V. Zoning text amendments – Redlined version W. Specific Plan amendments – Redlined version X. Planning Commission Study Session Staff Report dated September 9, 2014 Y. City Council Study Session Staff Report dated October 7, 2014 Z. Draft Environmental Impact Report dated June 18, 2014 AA. Response to Comments Document dated August 28, 2014 BB. Supplemental Text Revisions Memo dated November 3, 2014 CC. Updated Late Comments memo dated November 3, 2014 DD. Recommendation of the Environmental Review Committee EE. Public Comments Related to the General Plan and Housing Element 39 RESOLUTION NO. 14-210 OF THE CITY COUNCIL OF THE CITY OF CUPERTINO CERTIFYING AN ENVIRONMENTAL IMPACT REPORT FOR THE GENERAL PLAN AMENDMENT, HOUSING ELEMENT UPDATE, AND ASSOCIATED REZONING PROJECT; AND ADOPTING FINDINGS AND A STATEMENT OF OVERRIDING CONSIDERATIONS, MITIGATION MEASURES, AND A MITIGATION MONITORING AND REPORTING PROGRAM SECTION I: PROJECT DESCRIPTION Application No: EA-2013-03 Applicant: City of Cupertino Location: Citywide SECTION II: ENVIRONMENTAL REVIEW PROCESS WHEREAS pursuant to City Council direction to initiate a project to replenish, reallocate and increase citywide development allocations in order to plan for anticipated future development activity while keeping with the community’s character, goals, and objectives, and to consolidate development requests by several property owners for amendments to the General Plan, both under a comprehensive community vision, and WHEREAS, pursuant to State Housing Law, the City Council has directed staff to update the Housing Element of the General Plan and make associated zoning amendments to comply with State Law; and WHEREAS, pursuant to the provisions and requirements of the California Environmental Quality Act of 1970 (Public Resources Code Section 21000 et seq.) (“CEQA”) and the State CEQA Guidelines (Title 14, Sections 15000 et seq. of the California Code of Regulations) (“CEQA Guidelines”), the City of Cupertino as lead agency caused the General Plan Amendment, Housing Element Update and Associated Rezoning Final Environmental Impact Report (SCH#20140322007) (“EIR”) to be prepared; and WHEREAS, on March 5, 2014, the City issued Notice of Preparation for the EIR for the Project. A scoping session was held on March 11, 2014 to provide the public the opportunity to comment on the topics to be studied in the Draft Environmental Impact Report (“Draft EIR”). Public comments were collected through the scoping period’s conclusion on April 7, 2014; and WHEREAS, from April 8, 2014 to June 17, 2014, the City prepared a Draft EIR pursuant to the requirements of CEQA and the CEQA Guidelines; and WHEREAS, the Draft EIR was released for a 45-day public review/comment period beginning on June 18, 2014 and ending August 1, 2014; and 40 WHEREAS, the Notice of Completion of the Draft EIR was sent to the State Clearinghouse in the Governor’s Office of Planning and Research on June 18, 2014 under State Clearinghouse No. 2014032007, and the Notice of Availability was filed with the Santa Clara County Clerk- Recorder on the same day and was also: (1) sent to other potentially affected agencies as required by CEQA; (2) sent to adjacent property owners as required by CEQA; and (3) posted at the Project site and at City Hall; and WHEREAS, on June 24, 2014, the City held a duly noticed public meeting during the public comment period on the Draft EIR to allow the public an additional opportunity to provide input on the DEIR and received public testimony; and WHEREAS, following the close of the public review and comment period on the Draft EIR, responses to written comments concerning the adequacy of the DEIR received during the public review and comment period have been prepared and compiled in the Response to Comments Document, which includes revisions to the DEIR (“RTC Document”); and WHEREAS, the RTC Document was issued on August 28, 2014 and notice of availability was sent to the Santa Clara County Clerk Recorder’s Office, posted at City Hall and the Project site, and sent to 10 local libraries and interested persons registered through the project website; and WHEREAS, copies of the RTC Document were sent to all public agencies that commented on the Draft EIR; and WHEREAS, the City received comments on the Draft EIR following the close of the public review and comment period (“Late Comments”) and, although pursuant to Public Resources Code Section 21091(d)(1) and CEQA Guidelines Section 15088(a) written responses are not required, responses to Late Comments have been provided with staff reports; and WHEREAS, pursuant to Cupertino Municipal Code Section 2.86.100, the Housing Commission is authorized to assist the Planning Commission and the City Council in developing housing policies and strategies for implementation of general plan housing element goals; and WHEREAS, the necessary public notices have been given as required by the procedural ordinances of the City of Cupertino and the Government Code, the Housing Element and proposed amendments to the Cupertino Municipal Code pertaining to housing and affordable housing, were presented to the Housing Commission at a public hearing on August 28, 2014; and WHEREAS, on August 28, 2014, the Housing Commission recommended that the City Council authorize staff to forward the Draft Housing Element to the State Department of Housing and Community Development (HCD) and use the High-Low prioritization of Potential Housing Element Sites; WHEREAS, the necessary public notices have been given as required by the procedural ordinances of the City of Cupertino and the Government Code, the Draft EIR, the RTC 41 Document, and all documents incorporated therein were presented to the Planning Commission on September 9, 2014 at a Planning Commission Study Session; and WHEREAS, on October 2, 2014, City Staff presented the Draft EIR and the RTC Document, and all documents incorporated therein, to the Environmental Review Committee (“ERC”) for review and recommendation. After considering the documents, and Staff’s presentation, the ERC recommended that the City of Cupertino City Council approve the Project; and WHEREAS, Supplemental Text Revisions to the General Plan Amendment, Housing Element Update and Associated Rezoning, which is part of the Final EIR, identifies revisions which are typographical corrections, insignificant modifications, amplifications and clarifications of the Draft EIR and the RTC Document; and WHEREAS, the “Final EIR” consisting of the Draft EIR (published in June 2013), the RTC Document (published in September 2013), and Supplemental Text Revisions (published October 8, 2014) and all documents incorporated therein was presented to the City Council on October 7, 2014 at a City Council Study Session; and WHEREAS, the necessary public notices have been given as required by the procedural ordinances of the City of Cupertino and the Government Code, and the Planning Commission held a public hearing on October 14, 2014 and October 20, 2014 to consider the project; and WHEREAS, based on substantial evidence in the administrative record, on October 20, 2014 the Planning Commission recommended that the City Council certify that the Final EIR has been completed in compliance with the California Environmental Quality Act, Public Resources Code Section 21000 et seq., and reflects the independent judgment and analysis of the City, adopt the Findings and Statement of Overriding Considerations, and implement all of the mitigation measures for the Project that are within the responsibility and jurisdiction of the City that are identified in Findings, in substantially similar form to the Resolution presented (Resolution 6760); and WHEREAS, on October 14, 2014, the Planning Commission recommended on a 4-0-1 (Takahashi absent) vote that the City Council adopt the General Plan Amendment (GPA-2013-01), in substantially similar form to the Resolution presented (Resolution no. 6761); authorize staff to forward the Draft Housing Element to the State Department of Housing and Community Development for review and certification (GPA-2013-02); approve the prioritized list of potential Housing Element sites in the event amendments are needed to the proposed Housing Element sites upon HCD review, in substantially similar form to the Resolution presented (Resolution no. 6762); approve the Zoning Map Amendments, Z-2013-03, in substantially similar form to the Resolution presented (Resolution no. 6763); approve the Municipal Code Amendments to make changes to conform to the General Plan and Housing Element and other clean up text edits (MCA-2014-01) in substantially similar form to the Resolution presented (Resolution no. 6764); approve the Specific Plan Amendments (SPA-2014-01) in substantially similar form to the Resolution presented (Resolution no. 6765); and 42 WHEREAS, on November 10, 2014, the City Council held a duly noticed public hearing on the EIR (EA-2013-03); as well as the following concurrent Project applications: General Plan Amendment (GPA-2013-01), Housing Element update (GPA-2013-02), Zoning Map Amendment (Z-2013-01), Municipal Code Amendments (MCA-2014-01), Specific Plan Amendment (SPA- 2014-01). NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony, staff reports, public comments, and other evidence submitted in this matter, the City Council does: 1. Certify that the Final EIR for the Project has been completed in compliance with the California Environmental Quality Act, Public Resources Code Section 21000 et seq., and reflects the independent judgment and analysis of the City. 2. Adopt the Findings and Statement of Overriding Considerations for the Project, attached hereto as “Exhibit EA-1,” and incorporated herein by reference. 3. Adopt and incorporate into the Project all of the mitigation measures for the Project that are within the responsibility and jurisdiction of the City that are identified in the Findings. 4. Adopt the Mitigation Monitoring and Reporting Program for the Project, attached hereto as “Exhibit EA-2,” and incorporated herein by reference. PASSED AND ADOPTED at a Meeting of the City Council of the City of Cupertino the 10th day of November 2014, by the following roll call vote: Vote: Members of the City Council: AYES: NOES: ABSTAIN: ABSENT: RECUSE: ATTEST: APPROVED: _ ____ _______ __________ Grace Schmidt Gilber Wong City Clerk Mayor, City of Cupertino 43 I-1 EXHIBIT EA-1 CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS AND STATEMENT OF OVERRIDING CONSIDERATIONS FOR GENERAL PLAN AMENDMENT, HOUSING ELEMENT UPDATE, AND ASSOCIATED REZONING I. INTRODUCTION The City of Cupertino (City), as lead agency under the California Environmental Quality Act (CEQA), Public Resources Code Section 21000 et seq., has prepared the Final Environmental Impact Report for the General Plan Amendment, Housing Element Update, And Associated Rezoning (the “Project”) (State Clearinghouse No. 2014032007) (the “Final EIR” or “EIR”). The Final EIR is a program-level EIR pursuant to Section 15168 of the State CEQA Guidelines.1 The Final EIR consists of Volumes I and II of the June 2014 Public Review Draft Project Environmental Impact Report (the “Draft EIR”); the August 2013 Response to Comments Document; and the November 3, 2014 Supplemental Text Revisions memorandum,2 which contains typographical corrections, insignificant modifications, amplifications and clarifications of the EIR. In determining to approve the Project, which is described in more detail in Section II, below, the City makes and adopts the following findings of fact and statement of overriding considerations, and adopts and makes conditions of project approval the mitigation measures identified in the Final EIR, all based on substantial evidence in the whole record of this proceeding (administrative record). Pursuant to Section 15090(a) of the State CEQA Guidelines, the Final EIR was presented to the City Council, the City Council reviewed and considered the information contained in the Final EIR prior to making the findings in Sections II through XIII, below, and the City Council determined that the Final EIR reflects the independent judgment of the City. The conclusions presented in these findings are based on the Final EIR and other evidence in the administrative record. II. PROJECT DESCRIPTION (the ”Planning Commission Recommendation”) As fully described in Chapter 3 of the Draft EIR, the Project involves all of the following: (1) a focused General Plan Amendment consisting of revised city-wide development allocations for office commercial, and hotel uses, as well as buildings heights and densities for Major Mixed-Use Special Areas; (2) updating the General Plan Housing Element to accommodate 1 The State CEQA Guidelines are found at California Code of Regulations, Title 14, Section 15000 et seq. 2 PlaceWorks, Supplemental Text Revisions to the General Plan Amendment, Housing Element Update and Associated Rezoning Project Final Environmental Impact Report (EIR) (November 3, 2014) (“Supplemental Text Revisions Memo”). 44 I-2 the Regional Housing Needs Allocation (RHNA) for the 2014-2022 planning period to meet the City’s fair-share housing obligation of 1,064 units; (3) amending certain Zoning and Density Bonus portions of the City’s Municipal Code to be consistent with the Housing Element and to be consistent with requirements pertaining to emergency shelters; and (4) conforming changes to the General Plan Land Use Map, Zoning Ordinance and Zoning Map for consistency and for revisions required by State law, and reorganization for purposes of increasing clarity and ease of use. The increased development allocations would be allowed in specific locations throughout the City, which are categorized as follows and are described and depicted on figures in the EIR: • Special Areas (including City Gateways and Nodes along major transportation corridors); • Study Areas; • Other Special Areas (including Neighborhoods and Non-Residential/Mixed- Use Special Areas); and • Housing Element Sites The buildout of the potential future development in these identified locations is based on a horizon year of 2040; therefore, the EIR analyzes growth occurring between 2014 and 2040. The 2040 horizon year is generally consistent with other key planning documents, including Plan Bay Area, which is the Bay Area’s Regional Transportation Plan/ Sustainable Community Strategy to Senate Bill 375, the Sustainable Communities and Climate Protection Act. The EIR analyzed the proposed Project (which is titled “Land Use Alternative C” in the EIR)3 and three additional alternatives (No Project Alternative, Land Use Alternative A, and Land Use Alternative B), all at the same level of detail. The Planning Commission Recommendation is for the most part a combination of Alternatives A and B. The Planning Commission Recommendation consists of development allocations that are the same or reduced from the development allocations that were analyzed in the EIR, and revisions to the prioritization of the Housing Element sites that were analyzed in the EIR along with reassignment of housing units among the Housing Element sites. On several sites/gateways, the maximum height limits are reduced or remained the same as the heights analyzed in the EIR, except at two locations where the maximum height limits are increased from 35 to 45 feet (the Glenbrooks Housing Element site and the Summerwinds/Granite Rock/Jack-in-the-Box Housing Element site). Residential densities also are reduced or remained the same as the densities analyzed in the EIR, except that the residential density at 3 Draft EIR, p. 2-5 (Table 2-1, footnote a). 45 I-3 the Glenbrooks Housing Element site are increased from 20 to 23 dwelling units per acre. The increase in the number of additional units on the Glenbrooks site is limited to a maximum of 228 (100% of the remaining capacity at the site if the density is increased to 23 dwelling units per acre) to avoid increased traffic impacts. The purpose of the revisions to Alternative C in the Planning Commission Recommendation is to reduce the amount of additional office development in the City in order to reduce the regional impacts of creating jobs in Cupertino without commensurate, increased development of housing (see Section II.A, below). A. General Plan Amendment Every city and county in California is required to prepare and to adopt a comprehensive, long-term general plan for the physical development of the county or city and, in some cases, land outside the city or county boundaries. Government Code § 65300. The City’s current, 2000-2020 General Plan controls the area and density of commercial, office, hotel, and residential uses built in the city through development allocations in terms of square feet (commercial and office), rooms (hotel), and units (residential). The allocations are geographically assigned in certain neighborhoods, commercial, and employment centers so that private development fulfills both City goals and priorities and reduces adverse impacts to the environment. The City allocates development potential on a project-by-project basis to applicants for net new office and commercial square footage, hotel rooms, and/or residential units. As a result of several recent approvals of projects, a large amount of the current office, commercial and hotel development allocation has been granted, leaving an inadequate pool to allocate to additional development in the city. While the Project is not a complete revision of the City’s 2000-2020 General Plan. The current General Plan contains many goals, policies, standards, and programs that the City and community would like to continue into the future. The Project instead focuses on identifying and analyzing potential changes along the major transportation corridors in Cupertino that have the greatest ability to evolve in the near future because the rest of the city consists primarily of single-family residential neighborhoods. The development allocations in the Planning Commission Recommendation are as follows: • Office allocation : 1,040,231 square feet (net increase of 500,000 square feet from the 2000-2020 General Plan)4 • Commercial allocation (same as Alternative C): 1,343,679 square feet (net increase of 0 square feet from the 2000-2020 General Plan)5 4 The Alternative C proposed office allocation is 4,040,231 square feet (net increase of 3,500,000 square feet from 2000-2020 General Plan). 46 I-4 • Hotel allocation (same as Alternative C): 1,339 rooms (net increase of 1,000 rooms from the 2000-2020 General Plan) • Residential allocation eliminated; residential land uses permitted according to applicable General Plan land use designations and policies, Housing Element site inventory and policies, and zoning 6 As shown above, development allocations are the same as or are reduced from Alternative C, and the residential allocation pool has been eliminated altogether. Residential development is allowed at the locations, densities and intensities as provided for in the General Plan and Zoning Ordinance. As described above, the recommended heights are lower than those analyzed in the EIR, except in two locations (Glenbrooks Apartments in the Heart of the City and Summerwinds/Granite Rock/Jack in the Box Housing Element sites) at which the height limits would be increased from Alternative C (from 30 to 45 feet), and the residential density at one site are increased at one location (Glenbrook Apartments in the Heart of the City Special Area) from 20 dwelling units per acre analyzed in the EIR to 23 dwelling units per acre up to a limit of 228 units. The maximum height limits would be the same as or lower than Alternative B. See Land Use and Community Design Element, Table LU-2. The Planning Commission Recommendation provides for a reduced amount of new development and has less emphasis on office development than Alternative C. These changes in the General Plan Amendment and accompanying approvals do not create new or substantially more severe significant effects on the environment for the reasons explained below. The 15-foot height increases at Glenbrook Apartments Housing Element site, located in the Heart of the City Special Area, and the Summerwinds/Granite Rock/Jack in the Box Housing Element site, located in the South De Anza Mixed-Use Special Area, would not block views of areas that provide or contribute to scenic vistas and/or scenic corridors or from specific publically accessible vantage points or the alteration of the overall scenic vista/corridor itself or adversely impact the visual character of these sites or the surrounding areas. These two sites are already developed and/or underutilized, and in close proximity to existing 5 The EIR provided an analysis for the commercial development allocation of 1,343,679 square feet for Alternative C, which is an increase in commercial development allocation of 642,266 square feet over the remaining allocation of 701,413 square feet in the 2020 General Plan; however, the additional 642,266 square footage does not constitute a net increase in commercial development in Cupertino during the planning period of the General Plan Amendment (through 2040). That is because the entire 642,266 square feet of the increased allocation would come from demolition of Vallco Shopping Center and rebuilding and/or relocating that existing commercial square footage to other sites. Due to the high vacancy rate at the Vallco Shopping Mall under existing conditions, however, the EIR conservatively analyzed the total commercial development allocation of 1,343,679 square feet (642,266 existing square feet + 701,413 new square feet). 6 The Alternative C proposed residential allocation analyzed in the EIR is 4,421 units (net increase of 2,526 units from the 2000-2020 General Plan). 47 I-5 residential and residential-serving development, where future development would have a lesser impact on scenic vistas. Neither of these locations is within the viewshed of I-280, an eligible State Scenic Highway. The topography at these locations is essentially flat and the views from street-level public viewing to the scenic resources are currently inhibited by existing conditions such as buildings, structures, and mature trees or vegetation. Similar views would continue to be visible between projects and over lower density areas. Considering this and the fact that Housing Element Sites 5 and 16 are not considered a destination public viewing points nor are they visible from scenic vistas, overall impacts to scenic vistas would be less than significant. Furthermore, the 15-foot height increases would be subject to the City’s Architectural and Site Review process, in accordance with Chapter 19.168 of the Zoning Ordinance, or would be required to comply with Design Standards outlined in the General Plan and other regulatory documents. In addition, the General Plan policies aimed at protecting scenic resources would ensure future development of these sites would conceivably reduce potential aesthetic impacts of future development under the proposed Project. The increase in residential density at the Glenbrooks Apartments site, from 20 to 23 dwelling units per acre up to a maximum of 228 additional units, are minor, and would not cause new or substantially more severe significant environmental effects, because the number of additional units that could be developed in each Traffic Analysis Zone (TAZ), above what was analyzed in the EIR, would be 50 or fewer additional units. In addition, the site is located in either the VTA Priority Development area or adjacent to a major employment district and would provide residential development close to a large employment area, thereby potentially reducing traffic impacts. However, like Alternative C, the Planning Commission Recommendation will continue to have significant avoidable traffic, air quality and noise impacts even after incorporation of all feasible mitigation measures. The majority of the Planning Commission Recommendation is located in the City’s Special Areas as identified in the current General Plan. The development allocations can generally be used in Special Areas, Study Areas, Housing Element Sites and Other Special Areas; however, hotel development allocations may not be used in Other Special Areas. The boundaries and proposed changes within each Special Area, Study Area and Other Special Area are described in detail in Section 3.7 (Project Components) of Chapter 3 (Project Description) of the Draft EIR. B. Housing Element Update The Planning Commission Recommendation includes a comprehensive update to the City’s Housing Element (the “2014-2022 Housing Element”) in compliance with State law. The Housing Element’s policies and programs are intended to guide the City’s housing efforts through the 2014 to 2022 Housing Element period. The 2014-2022 Housing Element keeps 48 I-6 many of the existing policies and strategies in the 2007-2014 Housing Element and revises them to conform to changes in State law or based on a critical evaluation of the programs and policies. The Housing Element assesses housing needs for all income groups and establishes a program to meet these needs. The policies and strategies have also been reorganized to provide for better readability and to eliminate redundancies. State law requires each jurisdiction to address how it will satisfy the quantified objectives for new residential units as represented by the Regional Housing Needs Allocation (RHNA). The RHNA identifies Cupertino’s housing needs by income levels. The City’s housing needs allocation for the period 2014 to 2022 is 1,064 new housing units. The income levels are separated into four cate gories: very low, low, moderate and above moderate, shown in Draft EIR Table 3-20. Draft EIR, p. 3-66. State law allows jurisdictions to take credit for residential projects that have been approved, building permits issued during the plan period in which the review is taking place, and second dwelling units (also known as accessory dwelling units) that are anticipated to be constructed during the plan period. The City has issued entitlements and/or building permits for 30 units since January 1, 2014. Additionally, it is anticipated that 32 second units (on single-family lots) were constructed in the 2007-2014 plan period, 32 second units will be constructed in the current plan period as well. Therefore, the City can take credit for a total of 62 units (30 units approved and 32 second units anticipated). As a result, the City is required to identify sites for the construction of 1,064 minus 62 units, or 1,002 units. To accommodate the current planning period’s RHNA, the Available Land Inventory in the Draft 2014-2022 Housing Element identified 19 potential housing sites, which are analyzed in the EIR. The State Department of Housing and Community Development (HCD) generally requires jurisdictions to show a surplus of sites/units in order to guarantee that the City could realistically accommodate the RHNA allocations. Of the original 19 sites identified in the Draft EIR, nine remain for consideration.7 If all nine potential housing sites were developed, this would result in a net increase in housing in Cupertino of 1,843 new residential units between 2014 and 2040. Draft EIR, Table 3-12, pp. 3-68 to 3-70. The maximum number of new residential units pursuant to the Planning Commission Recommendation is 1,843 units. 7 Of the 19 studied in the EIR, nine sites are available for selection. That is because the largest property owner (Valley Church) associated with the IntraHealth/Tennis Courts etc. site on Stelling Road, and the owners of the Cypress Building/Hall Property have notified the City that their sites should not be included in the Housing Sites Inventory, and the Planning Commission Recommendation deleted 8 sites and moved the Summerwinds/Granite Rock/Jack in the Box site from the alternate to the recommended list. 49 I-7 These changes described above in the recommended Housing Element sites do not have the potential to create any new or substantially more severe significant effects on the environment for the following reasons. The increase of up to 228 units on the Glenbrook Apartments site would result in an increase of 135 units above the 93-unit increase that was analyzed in the Draft EIR (228 units – 93 units = 135 units). An increases of 50 or fewer units of housing is generally considered to be a negligible increase, and this increase is below that screening threshold because the Glenbrooks site is adjacent to The Oaks Shopping Center Housing Element site at which where the residential units are reduced from the 235 units analyzed in the EIR to 150 units. Therefore, the total increased development in the area would be offset by the 85 units that no longer would be built at The Oaks Shopping Center site (235 units – 150 units = 85 units). This reduction at The Oaks Shopping Center Site would offset part of the 135 unit increase at the Glenbrooks site, but not the full increased amount of 135 units units. There would still be an increase in the area of 122 units (135 units - 85 units = 50 units), which does not exceed the screening threshold of 50 additional units. Hence, the additional density would not create an new or substantially more severe significant impact than was analyzed in the EIR. HCD generally requires jurisdictions to show a surplus of sites/units in order to guarantee that the RHNA realistically can be accommodated. Based on consultation with HCD and the City’s housing consultant expert, it is anticipated that HCD will require sites to accommodate units equivalent to a moderate surplus above the City’s housing need, or approximately 1,400 units. Of the nine identified sites, the City Council has directed staff to submit six sites to HCD for review as to their adequacy under State Planning and Zoning Law. The means of achieving the development of these units are provided for in the policies and programs described in the Housing Element. The City's quantified objectives are identified in Table 3.4 of the Housing Element. The City is not obligated to construct the housing units identified by the RHNA. Rather, the City is required to demonstrate adequate capacity for 1,064 housing units by identifying sufficient specific sites in order to satisfy the RHNA under existing zoning and land use policy. In addition to analyzing the 2014-2022 Housing Element for the specified planning period, the Final EIR analyzes the overall environmental effects of increasing housing units on a citywide basis to address, which is necessary the address the two future housing elements that are expected to be adopted during the period between 2014 and General Plan Amendment horizon year of 2040. The Plan Bay Area (the Bay Area Region’s Sustainability Communities Strategy and Regional Transportation Plan) identifies that the City of Cupertino’s housing need by 2040 will be 4,421 units. 50 I-8 C. Conforming General Plan Amendments, Zoning Amendments, and Density Bonus Amendments As part of the Housing Element update process, Chapter 19.56 (Density Bonus) in Title 19 (Zoning) of the City’s Municipal Code will be amended to be consistent with the 2007–2014 Housing Element Program 12 (Density Bonus Program). Chapter 19.20 (Permitted, Conditional and Excluded Uses in Agricultural and Residential Zones), Chapter 19.76 (Public Building (BA), Quasi-Public Building (BQ) and Transportation (T) Zones), and Chapter 19.84 (Permitted, Conditional And Excluded Uses In Open Space, Park And Recreation And Private Recreation Zoning Districts), also in Title 19 (Zoning) of the City’s Municipal Code, will be amended to ensure conformance with SB 2 requirements pertaining to permanent emergency shelters and to comply with the State Employee Housing Act with respect to farmworker housing and employee housing. In addition, Program 17 of the Housing Element, which addresses the potential loss of multi-family housing and displacement of lower- and moderate-income households due to new development, will be amended to comply with recent legislation and to mitigate the potential displacement impacts to renters (e.g. tenant relocation benefits). The Planning Commission Recommendation also includes revisions to the General Plan Land Use Map, Zoning Ordinance (including the Chapters listed above and 19.08 (Definitions) and 19.144 (Development Agreements), and the Zoning map to ensure consistency with the General Plan as a result of changes to Housing Element policies or to address changes required as a result of State legislation adopted since the last General Plan update (such as Assembly Bill 1358, Complete Streets), and as a result of bringing non- conforming land uses into conformance with the General Plan and Zoning Ordinance. D. Project Objectives The project objectives are as follows: • Emphasize employment and a mix of economic development opportunities by replenishing, reallocating, and increasing city-wide office, commercial, and hotel, allocations in order to capture: • A share of the regional demand for office and hotel development, and • Retail sales tax leakage in the trade area. • Address local needs and regional requirements for new housing, including affordable housing, in Cupertino by replenishing, re-allocating and increasing city- wide residential allocations to be consistent with 2040 Bay Area Plan projections to allow flexibility for the city when future state-mandated updates are required to the Housing Element. 51 I-9 • Update the Housing Element as required by State law. • Creating opportunities for mixed-use development consistent with Regional Sustainable Communities Strategies for greenhouse gas emissions reductions as required by SB 375. • Investing in improvement to adapt to climate change over time. • Consider increased heights in key nodes and gateways, if proposed development provides retail development and benefits directly to the community. • Update General Plan policies to implement multi-modal traffic standards as opposed to LOS thresholds currently identified. Balancing development objectives with transportation constraints and opportunities. • Revitalize the Vallco Shopping District by adopting policies to support its redevelopment, so it becomes a cohesive, vibrant shopping and entertainment destination that serves both the region and the local community. III. ENVIRONMENTAL REVIEW PROCESS A. Environmental Impact Report On March 5, 2014, the City circulated a Notice of Preparation (NOP) of the Draft EIR to the Office of Planning and Research (OPR) State Clearinghouse and interested agencies and persons. A postcard notice had previously been delivered in February 2014 to all postal addresses in the City to announce upcoming dates for the General Plan and Housing Element projects. The NOP was circulated for comment by responsible and trustee agencies and interested parties for a total of 30 days, from March 5, 2014 through April 7, 2014, during which time the City held a public scoping meeting on March 11, 2014. Comments on the NOP were received by the City and considered during preparation of the Draft EIR. The Draft EIR was made available for review by the public and interested parties, agencies, and organizations for a 45-day comment period starting on June 18, 2014 and ending August 1, 2014. The Draft EIR was distributed to local, regional and State agencies. Copies of the Draft EIR in paper or electronic format were available to interested parties for purchase or review at Cupertino City Hall. The Draft EIR was also available for review at libraries in the City and in surrounding communities, and an electronic version of the Draft EIR and all appendices were posted on a website the City created for the combined General Plan and Housing Element projects at www.cuptertinogpa.org, which included an electronic comment portal to receive public comment 24 hours a day, seven days a week. The City continues to make these documents available on its website for the Project at the following URL: http://www.cupertinogpa.org/app_folders/view/1. The public was also invited to submit written comments on the Draft EIR to the City of Cupertino Community Development Department by mail or e-mail to planning@cupertino.org. 52 I-10 Notice of availability of the Draft EIR was made in several ways. The City sent a postcard announcing the availability of the Draft EIR and inviting attendance at the Draft EIR comment meeting to all postal addresses in Cupertino. In addition, in accordance with CEQA, the City posted the Notice of Availability (NOA) on the Project website. The City also sent emails providing notice of the Draft EIR’s availability to all persons who had indicated an interest in the Project and signed up for notifications through the City’s website. The local media publicized the availability of the Draft EIR and the public comment period. The City held a Community Open House and EIR Comment Meeting during the comment period on June 24, 2014. The City solicited written comments at the meeting by distributing comment cards that were collected at the end of the evening. The 45-day comment period on the Draft EIR ended on August 1, 2014 at 4:30 p.m. Agencies, organizations, and members of the public submitted written comments on the Draft EIR. The Responses to Comments Document, which is the third volume of the Final EIR, was issued for public review on August 28, 2014 and sent to public agencies who had commented on the Draft EIR. Chapter 5 of the Responses to Comments Document provides responses to the comments received during the comment period on the Draft EIR. Late comments received after the close of the public comment period have been addressed in memoranda submitted to the City Council. On September 9, 2014, the Planning Commission held a Study Session on the EIR and took public comments. On October 7, 2014, the City Council held a Study Session on the Final EIR and took public comments. On October 2, 2014, the Environmental Review Committee determined that the EIR was adequate and recommended that the City Council certify the EIR. On October 20, 2014, following a duly noticed public hearing on October 14, 2014 that was continued on October 20, 2014, the City Planning Commission, recommended that the City Council certify the Final EIR. B. Additional Housing Element Public Review Process The Housing Element must identify community involvement and decision-making processes and techniques that constitute affirmative steps for receiving input from all economic segments of the community, especially low-income persons and their representatives, as well as from other members of the community. Public participation, pursuant to Section 65583(c)(8) of the Government Code, was accomplished in a variety of ways. Outreach was conducted in the form of in-person interviews with stakeholders including several housing-related non-profits and organizations that provide services to low income families and individuals in the City; and with parties interested in the Housing 53 I-11 Element process, including property owners and community groups such as the Concerned Citizens of Cupertino and neighborhood groups. Below are some examples of outreach and noticing conducted as part of the Housing Element update. • Notice postcard sent to every postal address in the City. • Joint Housing Commission and Planning Commission workshop – January 23, 2014 • Housing Commission Workshop – February 12, 2014 • Open House – February 19, 2014, September 16, 2014 • Study Session held with Planning Commission – February 19, 2014 • Study Session held with City Council – March 3, 2014 • Housing Commission meeting on housing policy – March 19, 2014 • Joint Planning Commission/City meeting on housing policy – April 1, 2014 • Newspaper notices. • Notices sent to all prospective housing element site property owners prior to City Council authorization to commence environmental review. • Notices sent to all prospective housing element site property owners prior to Planning Commission and City Council prioritization of the sites for HCD review. • Webpage hosted focusing on the Housing Element Update process. • Notice of website additions and Workshop reminders e-mailed to over 300 Housing Element website subscribers. • Staff presentations at the Chamber of Commerce. • Housing Commission Meeting – August 28, 2014 • Planning Commission Hearing – October 14, 2014 and October 20, 2014 The City’s outreach also included stakeholder meetings with non-profit and for-profit housing developers, building industry trade groups, architects, planners, and affordable housing funders. The Housing Element update process in the City has involved a number of groups and individuals in the process of reviewing current housing conditions and needs and considering potential housing strategies. Two public workshops were held at Housing Commission meeting and at a Joint Planning Commission Housing Commission meeting. In addition, one publicly noticed Planning Commission Study Session was held and included 54 I-12 opportunity for public comment. Feedback from these study sessions and public workshops was used to identify needs, assess constraints and develop draft programs for the Housing Element update, and are included in Section 1.3 of Appendix A of the General Plan. IV. FINDINGS The findings, recommendations, and statement of overriding considerations set forth below (the “Findings”) are made and adopted by the Cupertino City Council as the City’s findings under CEQA and the State CEQA Guidelines relating to the Project. The Findings provide the written analysis and conclusions of this City Council regarding the Project’s environmental impacts, mitigation measures, alternatives to the Project, and the overriding considerations that support approval of the Project despite any remaining environmental effects it may have. These findings summarize the environmental determinations of the Final EIR with regard to project impacts before and after mitigation, and do not attempt to repeat the full analysis of each environmental impact contained in the Final EIR. Instead, these findings provide a summary description of and basis for each impact conclusion identified in the Final EIR, describe the applicable mitigation measures identified in the Final EIR, and state the City’s findings and rationale about the significance of each impact following the adoption of mitigation measures. A full explanation of these environmental findings and conclusions can be found in the Final EIR, and these findings hereby incorporate by reference the discussion and analysis in the Final EIR supporting the Final EIR’s determinations regarding mitigation measures and the Project’s impacts. When evaluating cumulative impacts, CEQA allows the use of either a list of past, present, and probable future projects, including projects outside the control of the lead agency, or a summary of projections in an adopted planning document. The cumulative impacts analysis in the Final EIR uses the projections approach and takes into account growth from the Project within the Cupertino city boundary and Sphere of Influence (SOI), in combination with impacts from projected growth in the rest of Santa Clara County and the surrounding region, as forecast by the Association of Bay Area Governments (ABAG). In adopting mitigation measures, below, the City intends to adopt each of the mitigation measures identified in the Final EIR. Accordingly, in the event a mitigation measure identified in the Final EIR has been inadvertently omitted from these findings, such mitigation measure is hereby adopted and incorporated into the Project in the findings below by reference. In addition, in the event the language of a mitigation measure set forth below fails to accurately reflect the mitigation measure in the Final EIR due to a clerical error, the language of the mitigation measure as set forth in the Final EIR shall control unless the language of the mitigation measure has been specifically and expressly modified by these findings. 55 I-13 Sections V and VI, below, provide brief descriptions of the impacts that the Final EIR identifies as either significant and unavoidable or less than significant with adopted mitigation. These descriptions also reproduce the full text of the mitigation measures identified in the Final EIR for each significant impact. V. SIGNIFICANT AND UNAVOIDABLE ADVERSE IMPACTS AND DISPOSITION OF RELATED MITIGATION MEASURES RESULTING IN SIGNIFICANT AND UNAVOIDABLE ADVERSE IMPACTS The Final EIR identifies the following significant and unavoidable adverse impacts associated with the approval of the Project, some of which can be reduced, although not to a less-than-significant level, through implementation of mitigation measures identified in the Final EIR. Public Resources Code § 21081(a)(1). In some cases, the City cannot require or control implementation of mitigation measures for certain impacts because they are within the responsibility and jurisdiction of other public agencies. Public Resources Code § 21081(a)(2). Therefore, as explained below, some impacts will remain significant and unavoidable notwithstanding adoption of feasible mitigation measures. To the extent that these mitigation measures will not mitigate or avoid all significant effects on the environment, and because the City cannot require mitigation measures that are within the responsibility and jurisdiction of other public agencies to be adopted or implemented by those agencies, it is hereby determined that any remaining significant and unavoidable adverse impacts are acceptable for the reasons specified in Section XII, below. Public Resources Code § 21081(a)(3). As explained in Section IX, below, the findings in this Section V are based on the Final EIR, the discussion and analysis in which is hereby incorporated in full by this reference. A. Impact AQ-1: Implementation of the Project would conflict with or obstruct implementation of the applicable air quality plan. The Final EIR finds that while the Project would support the primary goals of the 2010 Bay Area Clean Air Plan, the buildout of the Project would conflict with the BAAQMD Bay Area Clean Air Plan goal for community-wide VMT to increase at a slower rate compared to population and employment growth. The rate of growth in VMT would exceed the rate of population and employment growth, resulting in a substantial increase in regional criteria air pollutant emissions in Cupertino. There are no mitigation measures to reduce this impact to a less-than-significant level. Policies and development standards in the Project would lessen the impact, but due to the level of growth forecast in the city and the programmatic nature of the Project, the impact would be significant and unavoidable. B. Impact AQ-2: Implementation of the Project would violate any air quality standard or contribute substantially to an existing or projected air quality violation. 56 I-14 The Final EIR finds that future development under the Project would result in a substantial long-term increase in criteria air pollutants over the 26-year General Plan horizon. Criteria air pollutant emissions would be generated from on-site area sources (e.g., fuel used for landscaping equipment, consumer products), vehicle trips generated by the project, and energy use (e.g., natural gas used for cooking and heating). Because cumulative development within the City of Cupertino could exceed the regional significance thresholds, the Project could contribute to an increase in health effects in the basin until such time as the attainment standards are met in the San Francisco Bay Area Air Basin (SFBAAB). The impact is considered significant and unavoidable. Implementation of Mitigation Measures AQ-2a and AQ-2b, set forth below, which are hereby adopted and incorporated into the Project, would reduce these impacts, but not to a less-than-significant level. Due to the programmatic nature of the Project, no additional mitigation measures are available beyond Mitigation Measures AQ-2a and AQ-2b; therefore, the impact would be significant and unavoidable. Mitigation Measure AQ-2a: As part of the City’s development approval process, the City shall require applicants for future development projects to comply with the current Bay Area Air Quality Management District’s basic control measures for reducing construction emissions of PM10. Mitigation Measure AQ-2b: As part of the City’s development approval process, the City shall require applicants for future development projects that could generate emissions in excess of the Bay Area Air Quality Management District’s (BAAQMDs) current significance thresholds during construction, as determined by project-level environmental review, when applicable, to implement the current BAAQMD construction mitigation measures (e.g. Table 8-3 of the BAAQMD CEQA Guidelines) or any construction mitigation measures subsequently adopted by the BAAQMD. C. Impact AQ-3: Implementation of the Project would result in a cumulatively considerable net increase of any criteria pollutant for which the Project region is nonattainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors). The Final EIR finds that the Project will combine with regional growth within the air basin to result in a cumulatively considerable net increase of pollutants for the SFBAAB, which is currently designated a nonattainment area for California and National O3, California and National PM2.5, and California PM10 ambient air quality standards (AAQS). Any project that produces a significant regional air quality impact in an area that is in nonattainment adds to the cumulative impact. Mitigation measures AQ-2a and AQ-2b, set forth and incorporated 57 I-15 above, would reduce impacts to the extent feasible , but the Project’s impacts would remain significant and unavoidable. There are no mitigation measures to reduce the impact to a less-than-significant level. Air pollutant emissions associated with the Project would result in a cumulatively considerable contribution to air quality impacts, and the Project’s impacts would be significant and unavoidable. D. Impact AQ-6: Implementation of the Project would cumulatively contribute to air quality impacts in the San Francisco Bay Area Air Basin. As described in the discussion of Impact AQ-3, the Final EIR finds that regional air quality impacts will be significant. Implementation of the Project, in combination with past, present, and reasonably foreseeable projects, would result in a significant cumulative impact with respect to air quality even with the applicable regulations, as well as the Mitigation Measures AQ-2a, AQ-2b, AQ-4a and AQ-4b and the General Plan policies outlined in Impact AQ-1 through AQ-5. Therefore, this cumulative impact would be significant and unavoidable. There are no mitigation measures to reduce the impact to a less-than-significant level. Implementation of Mitigation Measures AQ-2a, AQ-2b, AQ-4a and AQ-4b and the General Plan policies outlined in Impact AQ-1 through AQ-5, would lessen the impact, but not to a less-then-significant level. Because the San Francisco Bay Area Air Basin is currently designated as a nonattainment area for California and National O3, California and National PM2.5, and California PM10 AAQS , the Project’s cumulative impact would be significant and unavoidable. E. Impact NOISE-3: Implementation of the Project would result in a substantial permanent increase in ambient noise levels in the Project vicinity above levels existing without the Project. The Final EIR finds that implementation of the Project would have a significant impact if it results in a substantial permanent increase in ambient noise levels in the project vicinity above levels existing without the Project. The Final EIR anticipates that there would be substantial permanent increases to ambient noise levels throughout Cupertino as a result of implementation of the Project and ongoing regional growth, and that these increases would result primarily from increases in transportation-related noise, especially noise from automobile traffic. Although the Project contains policies that could in certain cases reduce or prevent significant increases in ambient noise at sensitive land uses upon implementation (e.g., noise-reducing technologies, rubberized asphalt, soundwalls, berms, and improved building sound-insulation), the measures described in these policies would not be universally feasible, and some of the most effective noise-attenuation measures, including 58 I-16 sound walls and berms, would be infeasible or inappropriate in a majority of locations where sensitive land uses already exist. There are no mitigation measures to reduce the impact to a less-than-significant level. All conceivable mitigations would be either economically impractical, scientifically unachievable, outside the City’s jurisdiction, and/or inconsistent with City planning goals and objectives. Therefore, even after the application of relevant, feasible regulations and General Plan policies, the impact to ambient noise levels would remain significant and unavoidable. F. Impact NOISE-5: Implementation of the Project, in combination with past, present, and reasonably foreseeable projects, would result in significant cumulative impacts with respect to noise. The Final EIR finds that the analysis of the Project, as described in the discussions of Impact NOISE-3, addresses cumulative noise impacts from implementation of the Project. Similarly, the noise contours and traffic-related noise levels developed for the Project include and account for regional travel patterns as they affect traffic levels in the City. Thus, the future noise modeling which served as the foundation for the overall Project analysis was based on future, cumulative conditions, and finds that implementation of the Project would result in significant cumulative impacts. The Final EIR finds that even after the application of pertinent policies and strategies of the General Plan Amendment cumulative noise impacts of the Project, as described in the discussion of Impact NOISE-3, would remain significant and unavoidable. Thus, implementation of the Project would result in a significant and unavoidable cumulative impact with respect to noise. There are no feasible mitigation measures to reduce the impact to a less-than-significant level. As explained in the discussion of Impact NOISE-3, all conceivable cumulative noise mitigations would be economically impractical, scientifically unachievable, outside the City’s jurisdiction, and/or inconsistent with City planning goals and objectives, and would be infeasible. Therefore, even after the application of relevant, feasible regulations and General Plan policies, the cumulative impact would remain significant and unavoidable. G. Impact TRAF-1: Implementation of the Project would conflict with an applicable plan, ordinance or policy establishing measures of effectiveness for the performance of the circulation system, taking into account all modes of transportation including mass transit and non-motorized travel and relevant components of the circulation system, including but not limited to intersections, streets, highways and freeways, pedestrian and bicycle paths, and mass transit. 59 I-17 The Final EIR finds that implementation of the Project would generate additional motor vehicle trips on the local roadway network, resulting in significant impacts to sixteen (16) out of 41 study intersections during at least one of the AM or PM peak hours. See Draft EIR, Table 4.13-13.8 Implementation of Mitigation Measure TRAF-1, set forth below, which is hereby adopted and incorporated into the Project, would secure a funding mechanism for future roadway and infrastructure improvements that are necessary to mitigate impacts from future projects based on then current standards, but not to a less-than-significant level. Impacts would remain significant and unavoidable because the City cannot guarantee improvements at these intersections at this time. This is in part because the nexus study has yet to be prepared and because some of the impacted intersections are within the jurisdiction of the City of Sunnyvale, the City of Santa Clara, and Caltrans. The City will continue to cooperate with these jurisdictions to identify improvements that would reduce or minimize the impacts to intersections and roadways as a result of implementation of future development projects in Cupertino, but, because many of the improvements in Mitigation Measure TRAF- 1 are within the responsibility and jurisdiction of other agencies and not the City of Cupertino, this impact would remain significant and unavoidable. Mitigation Measure TRAF-1: The City of Cupertino shall commit to preparing and implementing a Transportation Mitigation Fee Program to guarantee funding for roadway and infrastructure improvements that are necessary to mitigate impacts from future projects based on the then current City standards. As part of the preparation of the Transportation Mitigation Fee Program, the City shall also commit to preparing a "nexus" study that will serve as the basis for requiring development impact fees under AB 1600 legislation, as codified by California Code Government Section 66000 et seq., to support implementation of the Project. The established procedures under AB 1600 require that a "reasonable relationship" or nexus exist between the transportation improvements and facilities required to mitigate the transportation impacts of new development pursuant to the Project. The following examples of transportation improvements and facilities would reduce impacts to acceptable level of service standards and these, among other improvements, could be included in the development impact fees nexus study: ♦ SR 85 Northbound Ramps and Stevens Creek Boulevard (#2): An exclusive left-turn lane for the northbound leg of the intersection (freeway off-ramp) at the intersection of SR 85 and Stevens Creek Boulevard would result in one left-turn lane, one all-movement lane, and one right turn lane. The additional lane could be added within the existing Caltrans right-of-way. 8 Following completion of the Draft EIR, the impacts to Intersection #29 were determined to be less-than-significant rather than significant. See Supplemental Text Revisions Memo. 60 I-18 ♦ Stelling Road and Stevens Creek Boulevard (#3): The addition of a second exclusive left-turn lane for the eastbound leg of the intersection from Stevens Creek Boulevard to northbound Stelling Road, which could be accomplished by reworking the median. Right turns would share the bike lane. ♦ Sunnyvale-Saratoga Road/De Anza Boulevard and Homestead Road (#5): Widen De Anza Boulevard to four lanes in each direction or the installation of triple left-turn lanes. ♦ De Anza Boulevard and I-280 Northbound Ramp (#6): Restriping of De Anza Boulevard in the southbound direction to provide room for right turn vehicles to be separated from through traffic may be required. The bike lane would be maintained, and right turns would occur from the bike lane. The right turns would continue to be controlled by the signal and would need to yield to pedestrians. ♦ De Anza Boulevard and Stevens Creek Boulevard (#8): Restripe westbound Stevens Creek Boulevard to provide room for right turn vehicles to be separated from through vehicles may be required. The right turn vehicles will share the bike lane and will still be controlled by the traffic signal. Paint a bike box at the front of the lane to provide bikes a place to wait at red lights. The pedestrian crossings will not be affected may enhance the bicycling experience. ♦ De Anza Boulevard and McClellan Road/Pacifica Drive (#9): Realign the intersection that is currently offset resulting in inefficient signal timing such that the McClellan Road and Pacifica Drive legs are across from each other may be required. In addition, double left turn lanes may be required to be added to De Anza Boulevard with sections of double lanes on McClellan Road and Pacifica Drive to receive the double left turn lanes. These improvements will require the acquisition of right-of-way and demolition of existing commercial buildings. However, some existing right-of-way could be abandoned, which would reduce the net right-of-way take. ♦ Wolfe Road and Homestead Road (#16): The addition of a third southbound through lane to the southbound approach of the intersection of Wolfe Road and Homestead Road may be required, as well as the addition of a southbound exclusive right-turn lane. Three southbound receiving lanes on the south side of the intersection currently exist. An additional westbound through lane for a total of three through-movement lanes, an additional receiving lane on Homestead westbound to receive the additional through lane, as well as the addition of a westbound exclusive right-turn lane may be required. This will require widening Homestead Road. An additional eastbound through lane for a total of three through-movement lanes, an additional receiving lane on Homestead eastbound to receive the additional through lane, as well as the addition of an eastbound exclusive left-turn lane for a total of two left-turn lanes may be required. These improvements will require the acquisition of right-of-way and demolition of parking areas. ♦ Wolfe Road and I-280 Northbound Ramp (#18): The Apple Campus 2 project will be adding a third northbound through lane starting at the northbound on ramp. This third lane will need to be extended farther south to effectively serve the additional northbound traffic due to the General 61 I-19 Plan development. This could require widening the Wolfe Road overcrossing. Right-of-way acquisition may be required. In accordance with Caltrans procedures, a Project Study Report (PSR) will need to be prepared. The PSR will look at all interchange improvement options, which may include widening the overcrossing and may also include a redesign of the interchange to go from a partial cloverleaf design to a diamond design. This could help with heavy volumes in the right lane, which contributes to the level-of-service deficiency. ♦ Wolfe Road and I-280 Southbound Ramp (#19): An additional through lane for a total of three through-movement lanes for the northbound leg of the intersection at the Wolfe Road and I- 280 Southbound Ramp may be required. This additional northbound through lane would require widening to the freeway overcrossing. In addition to widening the overcrossing, the City may wish to pursue a redesign of the interchange to go from a partial cloverleaf design to a diamond design. This could help with the problem of heavy volume in the right lane, which contributes to the level of service deficiency. ♦ Wolfe Road/Miller Avenue and Stevens Creek Boulevard (#21): The restriping of the westbound leg of the intersection to provide room so that right turn vehicles can be separated from through vehicles may be required. Right turn vehicles would share the bike lane. Right turn vehicles would still be controlled by the signal, and pedestrian crossings would not be affected. Paint a bike box at the front of the lane to provide bikes a place to wait at red lights may enhance the bicycling experience. ♦ North Tantau Avenue/Quail Avenue and Homestead Road (#24): Restriping of the southbound leg of the intersection (Quail Avenue) to provide a separate left turn lane may be required. This will require the removal of on-street parking near the intersection. The level-of- service calculations show that with implementation of these improvements, the intersection would operate at an acceptable LOS D. ♦ Tantau Avenue and Stevens Creek Boulevard (#27): The addition of a separate left-turn lane to northbound Tantau Avenue may be required. Right-of-way acquisition and demolition of existing commercial buildings would be required. ♦ Stevens Creek Boulevard and Agilent Technologies Driveway (#30): The restriping of the westbound leg of the intersection to provide room so that right turn vehicles can be separated from through vehicles may be required. Right turn vehicles would share the bike lane. Right turn vehicles would still be controlled by the signal, and pedestrian crossings would not be affected. Paint a bike box at the front of the lane to provide bikes a place to wait at red lights may enhance the bicycling experience. ♦ Lawrence Expressway Southbound Ramp and Stevens Creek Boulevard (CMP, County)(#31): The addition of a second right-turn lane for the southbound leg of the intersection at the Lawrence Expressway Southbound Ramp and Stevens Creek Boulevard may be required. 62 I-20 Both lanes would need to be controlled by the signal, and disallow right turns on red. Right-of- way acquisition may be required. ♦ Lawrence Expressway Northbound Ramp and Stevens Creek Boulevard (CMP, County) (#32): Redesign of the northbound leg of the intersection at the Lawrence Expressway Northbound Ramp and Stevens Creek Boulevard to provide one through-movement lane, and one exclusive right-turn lane may be required. Right-of-way acquisition would be required. The fees shall be assessed when there is new construction, an increase in square footage in an existing building, or the conversion of existing square footage to a more intensive use. The fees collected shall be applied toward circulation improvements and right-of-way acquisition. The fees shall be calculated by multiplying the proposed square footage, dwelling unit, or hotel room by the appropriate rate. Traffic mitigation fees shall be included with any other applicable fees payable at the time the building permit is issued. The City shall use the traffic mitigation fees to fund construction (or to recoup fees advanced to fund construction) of the transportation improvements identified above, among other things that at the time of potential future development may be warranted to mitigate traffic impacts. H. Impact TRAF 2: Implementation of the Project would conflict with an applicable congestion management program, including, but not limited to, level of service standards and travel demand measures, or other standards established by the county congestion management agency for designated roads or highways. The Final EIR finds that of the 41 intersections studied in the EIR traffic analysis, 21 are included in Santa Clara County’s Congestion Management Program (CMP). See Table 4.3- 13, Draft EIR. The Project would result in significant impacts to 11 CMP intersections during at least one of the peak hours. Implementation of Mitigation Measure TRAF-1, set forth and incorporated above, would reduce these impacts, but not to a less-than-significant level. Mitigation Measure: Implement Mitigation Measure TRAF-1. As described in the discussion of Impact TRAF-1, because many of the improvements in Mitigation Measure TRAF-1 are within the responsibility and jurisdiction of other agencies and not the City of Cupertino, these impacts would remain significant and unavoidable. I. Impact TRAF-6: Implementation of the Project, in combination with past, present, and reasonably foreseeable projects, would result in additional cumulatively considerable impacts. The Final EIR finds that the analysis of the Project, as described in the discussions of Impact TRAF-1 and Impact TRAF-2, addresses cumulative impacts to the transportation network in 63 I-21 the city and its surroundings; accordingly, cumulative impacts would be the same as Project-specific impacts. Therefore, the cumulative impacts to the City’s transportation network resulting from the Project would be significant and unavoidable. Mitigation Measure: Implement Mitigation Measure TRAF-1. As discussed under TRAF-1, because many of the improvements in Mitigation Measure TRAF-1 are within the responsibility and jurisdiction of other agencies and not the City of Cupertino, this cumulative impact would remain significant and unavoidable. VI. SIGNIFICANT ADVERSE IMPACTS IDENTIFIED IN THE FINAL EIR THAT ARE REDUCED TO A LESS-THAN-SIGNIFICANT LEVEL BY MITIGATION MEASURES ADOPTED AND INCORPORATED INOT THE PROJECT The Final EIR identifies the following significant impacts associated with the Project. It is hereby determined that the impacts addressed by these mitigation measures will be mitigated to a less than significant level or avoided by adopting and incorporating these mitigation measures conditions into the Project. Public Resources Code § 21081(a)(1). As explained in Section IX, below, the findings in this Section VI are based on the Final EIR, the discussion and analysis in which is hereby incorporated in full by this reference. A. Impact AQ-4: Implementation of the Project would expose sensitive receptors to substantial concentrations of air pollution. The Final EIR finds that the Project could result in locating sensitive receptors in proximity to major sources of air pollution or the siting of new sources of air pollution in proximity to sensitive receptors in the city. Nonresidential land uses that generate truck trips may generate substantial quantities of air pollutants within 1,000 feet of off-site sensitive receptors. In addition, proposed sensitive land uses in Cupertino may be within 1,000 feet of major sources of air pollutants, which would create a significant and unavoidable impact. Implementation of the Mitigation Measures AQ-4a and AQ-4b, set forth below, which are hereby adopted and incorporated into the Project, would reduce this impact to a less-than- significant level. Mitigation Measure AQ-4a: Applicants for future non-residential land uses within the city that: 1) have the potential to generate 100 or more diesel truck trips per day or have 40 or more trucks with operating diesel-powered Transport Refrigeration Units (TRUs), and 2) are within 1,000 feet of a sensitive land use (e.g. residential, schools, hospitals, nursing homes), as measured from the property line of the Project to 64 I-22 the property line of the nearest sensitive use, shall submit a health risk assessment (HRA) to the City of Cupertino prior to future discretionary Project approval. The HRA shall be prepared in accordance with policies and procedures of the State Office of Environmental Health Hazard Assessment and the Bay Area Air Quality Management District. If the HRA shows that the incremental cancer risk exceeds ten in one million (10E-06), PM2.5 concentrations exceed 0.3 µg/m3, or the appropriate noncancer hazard index exceeds 1.0, the applicant will be required to identify and demonstrate that Best Available Control Technologies for Toxics (T-BACTs) are capable of reducing potential cancer and noncancer risks to an acceptable level, including appropriate enforcement mechanisms. T-BACTs may include but are not limited to: • Restricting idling on-site. • Electrifying warehousing docks. • Requiring use of newer equipment and/or vehicles. • Restricting offsite truck travel through the creation of truck routes. T-BACTs identified in the HRA shall be identified as mitigation measures in the environmental document and/or incorporated into the site development plan as a component of the Project. Mitigation Measure AQ-4b: Applicants for residential and other sensitive land use projects (e.g. hospitals, nursing homes, day care centers) in Cupertino within 1,000 feet of a major sources of TACs (e.g. warehouses, industrial areas, freeways, and roadways with traffic volumes over 10,000 vehicle per day), as measured from the property line of the project to the property line of the source/edge of the nearest travel lane, shall submit a health risk assessment (HRA) to the City of Cupertino prior to future discretionary Project approval. The HRA shall be prepared in accordance with policies and procedures of the State Office of Environmental Health Hazard Assessment (OEHHA) and the Bay Area Air Quality Management District. The latest OEHHA guidelines shall be used for the analysis, including age sensitivity factors, breathing rates, and body weights appropriate for children age 0 to 16 years. If the HRA shows that the incremental cancer risk exceeds ten in one million (10E-06), PM2.5 concentrations exceed 0.3 µg/m3, or the appropriate noncancer hazard index exceeds 1.0, the applicant will be required to identify and demonstrate that mitigation measures are capable of reducing potential cancer and non-cancer risks to an acceptable level (i.e. below ten in one million or a hazard index of 1.0), including appropriate enforcement mechanisms. Measures to reduce risk may include but are not limited to: • Air intakes located away from high volume roadways and/or truck loading zones. • Heating, ventilation, and air conditioning systems of the buildings provided with appropriately sized Maximum Efficiency Rating Value (MERV) filters. Mitigation measures identified in the HRA shall be identified as mitigation measures in the 65 I-23 environmental document and/or incorporated into the site development plan as a component of the Project. The air intake design and MERV filter requirements shall be noted and/or reflected on all building plans submitted to the City and shall be verified by the City’s Planning Division. B. Impact BIO-1: Implementation of the Project would have a substantial adverse effect, either directly or through habitat modifications, on a plant or animal population, or essential habitat, defined as a candidate, sensitive or special-status species. The Final EIR finds that some special-status bird species such as Cooper’s hawk and white- tailed kite could utilize the remaining riparian corridors and heavily wooded areas for nesting, dispersal and other functions when they pass through urbanized areas. More common birds protected under MBTA may nest in trees and other landscaping on the Project Component locations. Given the remote potential for occurrence of nesting birds at one or more of the Project Component locations and possibility that nests could be inadvertently destroyed or nests abandoned as a result of construction activities, this would be considered a potentially significant impact. Implementation of Mitigation Measure BIO-1, set forth below, which is hereby adopted and incorporated into the Project, would avoid or reduce this impact to a less-than-significant level. Mitigation Measure BIO-1: Nests of raptors and other birds shall be protected when in active use, as required by the federal Migratory Bird Treaty Act and the California Department of Fish and Game Code. If construction activities and any required tree removal occur during the breeding season (February 1 and August 31), a qualified biologist shall be required to conduct surveys prior to tree removal or construction activities. Preconstruction surveys are not required for tree removal or construction activities outside the nesting period. If construction would occur during the nesting season (February 1 to August 31), preconstruction surveys shall be conducted no more than 14 days prior to the start of tree removal or construction. Preconstruction surveys shall be repeated at 14-day intervals until construction has been initiated in the area after which surveys can be stopped. Locations of active nests containing viable eggs or young birds shall be documented and protective measures implemented under the direction of the qualified biologist until the nests no longer contain eggs or young birds. Protective measures shall include establishment of clearly delineated exclusion zones (i.e. demarcated by identifiable fencing, such as orange construction fencing or equivalent) around each nest location as determined by a qualified biologist, taking into account the species of birds nesting, their tolerance for disturbance and proximity to existing development. In general, exclusion zones shall be a minimum of 300 feet for raptors and 75 feet for passerines and other birds. The active nest within an exclusion zone shall be monitored on a weekly basis throughout the nesting season to identify signs of disturbance and confirm nesting status. The radius of an exclusion zone may be increased by the qualified biologist if project activities are determined to be adversely affecting the nesting birds. 66 I-24 Exclusion zones may be reduced by the qualified biologist only in consultation with California Department of Fish and Wildlife. The protection measures shall remain in effect until the young have left the nest and are foraging independently or the nest is no longer active. C. Impact BIO-6: Implementation of the Project, in combination with past, present, and reasonably foreseeable projects, would result in significant cumulative impacts with respect to biological resources. The Final EIR finds that implementation of the Project could result in further conversion of existing natural habitats to urban and suburban conditions, limiting the existing habitat values of the surrounding area and potentially resulting in significant cumulative impacts with respect to biological resources. With implementation of Mitigation Measure BIO-1, set forth and incorporated above, the Project would not make a cumulatively considerable contribution to this cumulative impact, and the impact would be less than significant. Mitigation Measure: Implement Mitigation Measure BIO-1. D. Impact HAZ-4: Implementation of the Project would be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, create a significant hazard to the public or the environment. The Final EIR finds that because hazardous materials are known to be present in soil, soil gas, and/or groundwater due to past land uses at certain sites that may be redeveloped as part of the Project, the direct contact, inhalation, or ingestion of hazardous materials could potentially cause adverse health effects to construction workers and future site users. The severity of health effects would depend on the contaminant(s), concentration, use of personal protective equipment during construction, and duration of exposure. The disturbance and release of hazardous materials during earthwork activities, if present, could pose a hazard to construction workers, nearby receptors, and the environment and impacts could be potentially significant. Implementation of Mitigation Measures HAZ-4a and HAZ-4b, set forth below, which are hereby adopted and incorporated into the Project, would avoid or reduce this impact to a less-than-significant level. Mitigation Measure HAZ-4a: Construction at the sites with known contamination shall be conducted under a project-specific Environmental Site Management Plan (ESMP) that is prepared in consultation with the Regional 67 I-25 Water Quality Control Board (RWQCB) or the Department of Toxic Substances Control (DTSC), as appropriate. The purpose of the ESMP is to protect construction workers, the general public, the environment, and future site occupants from subsurface hazardous materials previously identified at the site and to address the possibility of encountering unknown contamination or hazards in the subsurface. The ESMP shall summarize soil and groundwater analytical data collected on the project site during past investigations; identify management options for excavated soil and groundwater, if contaminated media are encountered during deep excavations; and identify monitoring, irrigation, or other wells requiring proper abandonment in compliance with local, State, and federal laws, policies, and regulations. The ESMP shall include measures for identifying, testing, and managing soil and groundwater suspected of or known to contain hazardous materials. The ESMP shall: 1) provide procedures for evaluating, handling, storing, testing, and disposing of soil and groundwater during project excavation and dewatering activities, respectively; 2) describe required worker health and safety provisions for all workers potentially exposed to hazardous materials in accordance with State and federal worker safety regulations; and 3) designate personnel responsible for implementation of the ESMP. Mitigation Measure HAZ-4b: For those sites with potential residual contamination in soil, gas, or groundwater that are planned for redevelopment with an overlying occupied building, a vapor intrusion assessment shall be performed by a licensed environmental professional. If the results of the vapor intrusion assessment indicate the potential for significant vapor intrusion into an occupied building, project design shall include vapor controls or source removal, as appropriate, in accordance with regulatory agency requirements. Soil vapor mitigations or controls could include vapor barriers, passive venting, and/or active venting. The vapor intrusion assessment and associated vapor controls or source removal can be incorporated into the ESMP (Mitigation Measure HAZ-4a). E. Impact HAZ-7: Implementation of the Project, in combination with past, present, and reasonably foreseeable projects, would result in less than significant cumulative impacts with respect to hazards and hazardous materials. The Final EIR takes into account growth projected by the Project within the Cupertino city boundary and Sphere of Influence (SOI), in combination with impacts from projected growth in the rest of Santa Clara County and the surrounding region, as forecast by the Association of Bay Area of Governments (ABAG). Potential cumulative hazardous materials impacts could arise from a combination of the development of the Project together with the regional growth in the immediate vicinity of the Project Study Area. As discussed under Impact HAZ-4, disturbance and release of hazardous materials during earthwork activities, if present, could pose a hazard to construction workers, nearby receptors, and the environment and impacts could be potentially significant. 68 I-26 With implementation of Mitigation Measures HAZ-4a and HAZ-4b, set forth and incorporated above, in conjunction with compliance with General Plan policies and strategies, other local, regional, State, and federal regulations, the Project would not make a cumulatively considerable contribution to this cumulative impact, and the impact would be less than significant. Mitigation Measure: Implement Mitigation Measures HAZ-4a and HAZ-4b. F. Impact UTIL-6: Implementation of the Project would result in a determination by the wastewater treatment provider, which serves, or may serve the project, that it does not have adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments. Buildout of the Project would have a significant impact if future projected demand exceeds the wastewater service capacity of the San Jose/Santa Clara Water Pollution Control Plan (SJ/SCWPCP) or the Sunnyvale Water Pollution Control Plan (SWPCP), or the Cupertino Sanitary District (CSD) or City of Sunnyvale collection systems. Implementation of Mitigation Measures UTIL-6a, UTIL-6b, and UTIL-6c, set forth below, which are hereby adopted and incorporated into the Project, would avoid or reduce this impact to a less-than-significant level. Mitigation Measure UTIL-6a: The City shall work with the Cupertino Sanitary District to increase the available citywide treatment and transmission capacity to 8.65 million gallons per day, or to a lesser threshold if studies justifying reduced wastewater generation rates are approved by CSD as described in Mitigation Measure UTIL- 6c. Mitigation Measure UTIL-6b: The City shall work to establish a system in which a development monitoring and tracking system to tabulate cumulative increases in projected wastewater generation from approved projects for comparison to the Cupertino Sanitary District’s treatment capacity threshold with San Jose/Santa Clara Water Pollution Control Plant is prepared and implemented. If it is anticipated that with approval of a development project the actual system discharge would exceed the contractual treatment threshold, no building permits for such project shall be issued prior to increasing the available citywide contractual treatment and transmission capacity as described in Mitigation Measure UTIL- 6a. 69 I-27 Mitigation Measure UTIL-6c: The City shall work with the Cupertino Sanitary District to prepare a study to determine a more current estimate of the wastewater generation rates that reflect the actual development to be constructed as part of Project implementation. The study could include determining how the green/LEED certified buildings in the City reduce wastewater demands. G. Impact UTIL-7: Implementation of the Project, in combination with past, present, and reasonably foreseeable projects, would not result in significant cumulative impacts with respect to wastewater treatment. The Final EIR finds that buildout of the Project would generate a minor increase in the volume of wastewater delivered for treatment at SJ/SCWPCP and SWPCP, representing less than 1 percent of the available treatment capacity at the SJ/SCWPCP and SWPCP, and it would occur incrementally over a period of 26 years. Based on the recent trends of diminishing wastewater treatment demand and the projected population growth in the service areas, cumulative wastewater treatment demand over the Project buildout period is far below the excess capacity of the SJ/SCWPCP and SWPCP. Because the cumulative demand would not substantially impact the existing or planned capacity of the wastewater treatment systems, which have sufficient capacity for wastewater that would be produced by the Project, the construction of new wastewater treatment facilities would not be necessary. With implementation of Mitigation Measured UTIL-6a, UTIL-6b and UTIL-6c, set forth and incorporated above, cumulative development combined with the Project would not exceed wastewater treatment requirements. Therefore, the Project would not make a cumulatively considerable contribution to this cumulative impact, and the impact would be less than significant. Mitigation Measure: Implement Mitigation Measures UTIL-6a, UTIL-6b, and UTIL-6c. H. Impact UTIL-8: The Project would not be served by a landfill(s) with sufficient permitted capacity to accommodate the Project’s solid waste disposal needs. The Final EIR finds that anticipated rates of solid waste disposal would have a less-than- significant impact with regard to target disposal rates, and that the City would continue its current recycling ordinances and zero-waste policies. Nevertheless, the 2023 termination of the agreement between the Newby Island Landfill facility, as well as that facility’s estimated closure date in 2025, would result in insufficient solid waste disposal capacity at buildout of the Project, resulting in a significant impact. 70 I-28 Implementation of Mitigation Measure UTIL-8, set forth below, which is hereby adopted and incorporated into the Project, would avoid or reduce this impacts to a less-than- significant level. Mitigation Measure UTIL-8: The City shall continue its current recycling ordinances and zero-waste policies in an effort to further increase its diversion rate and lower its per capita disposal rate. In addition, the City shall monitor solid waste generation volumes in relation to capacities at receiving landfill sites to ensure that sufficient capacity exists to accommodate future growth. The City shall seek new landfill sites to replace the Altamont and Newby Island landfills, at such time that these landfills are closed. I. Impact UTIL-10: Implementation of the Project, in combination with past, present and reasonably foreseeable projects, would result in significant cumulative impacts with respect to solid waste. The Final EIR finds that buildout of the Project will increase the quantity of solid waste for disposal. AB 939 established a goal for all California cities to provide at least 15 years of ongoing landfill capacity; however, growth from other cities in the region may exceed the growth that was taken into account when determining landfill capacity. Also, because the Newby Island Landfill facility, which currently takes approximately 92 percent of the City's solid waste, is expected to close in 2025, Cupertino may eventually experience insufficient landfill capacity to accommodate existing or increased population and employment levels. Although implementation of existing waste reduction programs and diversion requirements would reduce the potential for exceeding existing capacities of landfills, the potential lack of landfill capacity for disposal of solid waste would be a significant cumulative impact. With implementation of Mitigation Measure UTIL-8, set forth and incorporated above, the Project would not make a cumulatively considerable contribution to this cumulative impact, and the impact would be less than significant. Mitigation Measure Implement Mitigation Measure UTIL-8. VII. GROWTH INDUCING IMPACTS An EIR is required to discuss growth inducing impacts, which consist of the ways in which the project could foster economic or population growth, or the construction of additional housing, either directly or indirectly, in the surrounding environment. State CEQA Guidelines § 15126.2(d); Public Resources Code § 21100(b)(5). Direct growth inducement would result, for example, if a project involves the construction of substantial new housing that would support increased population in a community or establishes substantial new 71 I-29 permanent employment opportunities. This additional population could, in turn, increase demands for public utilities, public services, roads, and other infrastructure. Indirect growth inducement would result if a project stimulates economic activity that requires physical development or removes an obstacle to growth and development (e.g., increasing infrastructure capacity that would enable new or additional development). It must not be assumed that growth in any area is necessarily beneficial, detrimental, or of little significance to the environment. State CEQA Guidelines § 15126.2(d). Section 6.3 of the Draft EIR analyzes the growth inducing impacts of the Project. As explained in Section IX, below, the findings in this Section VII are based on the Final EIR, the discussion and analysis in which is hereby incorporated in full by this reference. Implementation of the Project would directly induce population, employment and economic growth by replenishing the commercial, residential, hotel, and office space allocation within some areas of the city. The Project would result in the following growth patterns based on the expected growth assumptions for the city boundary: • Implementation of the Project to the year 2040 would result in increased office space development allocation of approximately 500,000 square feet for a total office allocation of 1,040,231 square feet. This would result in a total anticipated office space of approximately 11,470,005 square feet by 2040.9 • Implementation of the Project to the year 2040 would result in a commercial space development allocation of approximately 1,343,679 square feet, which is an increase of 642,266 square feet in the allocation pool but a net increase of 0 square feet. That is because all 642,266 square feet of increase allocation would come from demolition and rebuilding of existing commercial square footage (see footnote 5, above). This would result in a total anticipated commercial space of approximately 4,430,982 square feet by 2040.10 • Implementation of the Project to the year 2040 would result in increased hotel room development allocation of approximately 1,000 rooms for a total hotel room allocation of 1,339 rooms. This would result in a total anticipated hotel room inventory of approximately 2,429 rooms by 2040.11 State law requires the City to promote the production of housing to meet its Regional Housing Needs Allocation made by ABAG. The housing and commercial/ industrial growth in Cupertino would allow the City to address its regional fair-share housing obligations. 9 Existing built/approved office space was 8,929,774 square feet in 2013. 10 Existing built/approved commercial space was 3,729,569 square feet in 2013. With the remaining commercial allocation, commercial buildout by 2040 is estimated to be 4,430,982 square feet. Cupertino Community Development Department (October 31, 2014). 11 Existing built/approved hotel rooms was 1,090 rooms in 2013. 72 I-30 The Project is considered growth inducing because it encourages new growth in the urbanized areas of Cupertino. Development in these areas would consist of infill development on underutilized sites, sites that have been previously developed, and sites that are vacant and have been determined to be suitable for development. However, because infrastructure is largely in place and commercial or office growth would be required to comply with the City’s General Plan, Zoning regulations and standards for public services and utilities; secondary or indirect effects associated with this growth do not represent a new significant environmental impact which has not already been addressed in the individual resource chapters of this EIR. VIII. ALTERNATIVES The Final EIR analyzed four alternatives, examining the environmental impacts and feasibility of each alternative, as well as the ability of the alternatives to meet project objectives. The project objectives are listed in Chapter 3 (Project Description) of the Draft EIR; the potentially significant environmental effects of the Project, including feasible mitigation measures identified to avoid these impacts, are analyzed in Chapter 4 (Environmental Evaluation) of the Draft EIR; and the alternatives are described in detail in Chapter 5 (Alternatives to the Proposed Project) of the Draft EIR. Brief summaries of the alternatives are provided below. A brief discussion of the Environmentally Superior Alternative follows the summaries of the alternatives. As explained in Section IX, below, the findings in this Section VII are based on the Final EIR, the discussion and analysis in which is hereby incorporated in full by this reference. A. The No Project Alternative CEQA requires evaluation of the “no project” alternative. State CEQA Guidelines § 15126.6(e). Consistent with State CEQA Guidelines section 15126.6(e)(3)(A), the No Project Alternative assumes that growth and development would continue to occur under the provisions of the current 2000-2020 General Plan, including the development allocations for office and commercial space, and hotel and residential unit allocations. Thus, no new development potential beyond what is currently permitted in the 2000-2020 General Plan would occur. As shown in Draft EIR Table 5-1, the No Project Alternative would allow for the following new development allocations: • Office allocation: 540,231 square feet (no net increase from 2000-2020 General Plan) • Commercial allocation: 701,413 square feet (no net increase from 2000-2020 General Plan) 73 I-31 • Hotel allocation: 339 rooms (no net increase from 2000-2020 General Plan) • Residential allocation: 1,895 units (no net increase from 2000-2020 General Plan) As discussed in Section 5.1.7 of the Draft EIR, the No Project Alternative would not achieve any of the City’s project objectives, which are as follows, except that it would provide for the RHNA for the 20014-2022 planning period: • Emphasize employment and a mix of economic development opportunities by replenishing, reallocating, and increasing city-wide office, commercial, and hotel, allocations in order to capture: • A share of the regional demand for office and hotel development, and • Retail sales tax leakage in the trade area. • Address local needs and regional requirements for new housing, including affordable housing, in Cupertino by replenishing, re-allocating and increasing city- wide residential allocations to be consistent with 2040 Bay Area Plan projections to allow flexibility for the city when future state-mandated updates are required to the Housing Element. • Update the Housing Element as required by State law. • Creating opportunities for mixed-use development consistent with Regional Sustainable Communities Strategies for greenhouse gas emissions reductions as required by SB 375. • Investing in improvement to adapt to climate change over time. • Consider increased heights in key nodes and gateways, if proposed development provides retail development and benefits directly to the community. • Update General Plan policies to implement multi-modal traffic standards as opposed to LOS thresholds currently identified. Balancing development objectives with transportation constraints and opportunities. • Revitalize the Vallco Shopping District by adopting policies to support its redevelopment, so it becomes a cohesive, vibrant shopping and entertainment destination that serves both the region and the local community. For the foregoing reasons, the No Project Alternative is hereby rejected as infeasible. 74 I-32 B. Land Use Alternative A Land Use Alternative A identifies how growth would occur if the City largely continues the policies of the current 2005 General Plan, while making minor development allocation and boundary changes. The 2005 General Plan land use standards would continue to apply to Vallco Shopping Mall, and it would not be redeveloped in any substantial manner. Alternative A would increase city-wide office and hotel allocation but would not increase allocations for commercial and residential uses. No maximum height increases are proposed under this alternative. As shown in Draft EIR Table 5-1, the Land Use Alternative A would allow for the following new development allocations: • Office allocation: 1,040,231 square feet (net increase of 500,000 square feet from the 2000-2020 General Plan) • Commercial allocation: 701,413 square feet (no net increase from the 2000-2020 General Plan) • Hotel allocation: 600 rooms (net increase of 261 rooms from the 2000-2020 General Plan) • Residential: 1,895 units (no net increase from the 2000-2020 General Plan) As discussed in Section 5.2.8 of the Draft EIR, Alternative A would not achieve the project objectives concerning local needs and regional requirements for new housing, including affordable housing, in Cupertino, because it would not provide sufficient residential units to meet the City’s Regional Housing Needs Allocation (RHNA) of 1,064 units. In order to fully comply with the RHNA, the City would need to provide a moderate surplus in addition to the RHNA or approximately 1,400 units. Alternative A only allows for a surplus of only eight units, however. Alternative A also would not increase the allocation of residential units to accommodate Plan Bay Area projections for residential growth by 2040 (4,421 units). Alternative A fails to meet project objectives with regard to reallocating, replenishing and increasing city-wide office, commercial and hotel allocations for purposes of economic development, because Alternative A does not allow for any commercial growth beyond that allocated under the 2000-2020 General Plan and allows in insufficient amount of office and hotel growth. Further, Alternative A does not meet the project objective to consider increased heights in key Nodes and Gateways, because no maximum height increases are proposed under this alternative. Alternative A also does not meet the City’s objective of creating mixed use development consistent with Plan Bay Area and SB 375, because it would not concentrate development in major transportation corridors to the same degree as Alternatives B and C. Alternative A 75 I-33 does not envision a complete redevelopment for Vallco Shopping District that would involve adding office and residential uses as in Alternatives B and C. This would not completely meet the project objective to revitalize the Shopping District so it becomes a cohesive, vibrant shopping and entertainment destination that serves both the region and the local community. For the foregoing reasons, Land Use Alternative A is hereby rejected as infeasible. C. Land Use Alternative B Land Use Alternative B identifies how the City can focus development along major mixed- use corridors in order to create more complete commercial, office and entertainment areas, and to address mid-term housing needs. It would increase development allocations for office, commercial and hotel land uses in order to better capture retail sales leakage and regional demand for office development. Alternative B also envisions the transformation of the Vallco Shopping Mall into a retail, employment, housing and entertainment destination. Alternative B would allow for revised height standards at key Gateways and Nodes within Special Areas along major transportation corridors. Alternative B also would increase residential allocations to the amount necessary to meet the City’s RHNA of 1,064 units plus a moderate surplus, or approximately 1,400 units, but would increase the allocation of residential units to accommodate only 75 percent of Plan Bay Area projections for residential growth by 2040. As shown in Draft EIR Table 5-1 and the Supplemental Text Revisions, the Land Use Alternative B would allow for the following new development allocations: • Office allocation: 2,540,231 square feet (net increase of 2,000,000 square feet from the 2000-2020 General Plan) • Commercial allocation: 1,343,679 square feet (net increase of 0 square feet from 2000-2020 General Plan)12 • Hotel allocation: 839 rooms (net increase of 500 rooms from the 2000-2020 General Plan) • Residential allocation: 3,316 units (net increase of 1,421 units from the 2000-2020 General Plan) While Alternative B meets all of the project objectives, in comparison with the Planning Commission Recommendation, described in Section II.A, above, Alternative B would not reduce the amount of additional office development in the City sufficiently to further reduce the regional traffic impacts of creating jobs in Cupertino without commensurate, increased 12 See footnote 5, above. 76 I-34 development of housing. Furthermore, as described in Section 5.3.8 of the Draft EIR, Alternative B would not go as far as Alternative C in meeting project objectives with regard to reallocating, replenishing and increasing city-wide commercial and hotel allocations for purposes of economic development, and replenishment of the residential allocation. Alternative B envisions that the Vallco Shopping District will be completely, but does not specifically allocate any development potential to that Special Area. Alternative B allows for 500 fewer hotel rooms and 1,105 fewer residential units than the Planning Commission Recommendation, however. The City commissioned a Market Study 13 which indicates that the City has a strong market for office, hotel room and residential development. An allocation of only 500 hotel rooms and only 75 percent of the Plan Bay Area projection for residential development by 2040 would not achieve the City’s goal of capturing a share of the regional demand for hotel development or meeting the City’s goals of providing fewer affordable housing options. For the foregoing reasons, Land Use Alternative B is hereby rejected as infeasible. D. Land Use Alternative C Land Use Alternative C identifies a way to transform the Vallco Shopping Mall into a locally and regionally significant retail, employment, housing and entertainment destination, and account for a large portion of the City’s RHNA. Similar to the Planning Commission Recommendation, Alternative C envisions that the Vallco Shopping District will be completely redeveloped. In addition, under Alternative C, the Vallco area would become the “downtown” of Cupertino, serving the mixed-use hub for residents, workers and the larger region. Alternative C would increase development allocations to levels higher than those that would be allowed under either Land Use Alternative A or Land Use Alternative B in order to fully capture retail sales leakage and regional demand for office and hotel development. Alternative C would allow for revised height standards at key Gateways and Nodes within Special Areas along major transportation corridors at heights greater than those allowed under Alternative B. The increases in heights and densities in key Nodes, Gateways and Sub-areas are consistent with the City’s goals of concentrating development along the five mixed-use corridors. Alternative C also would increase residential allocations to the amount necessary to meet the City’s RHNA of 1,064 units plus a moderate surplus, or approximately 1,400 units, and would increase the allocation of residential units to accommodate 100 percent of Plan Bay Area projections for residential growth by 2040. As shown in Draft EIR Table 5-1 and the Supplemental Text Revisions, the Land Use Alternative C (the “proposed Project” in the EIR) would allow for the following new development allocations: 13 BAE Urban Economics, General Plan Amendment Market Study (February 13, 2014). 77 I-35 • Office allocations: 4,040,231 square feet (net increase of 3,500,000 square feet from the 2000-2020 General Plan) • Commercial allocation: 1,343,679 square feet (net increase of 0 square feet from the 2000-2020 General Plan)14 • Hotel allocation: 1,339 rooms (net increase of 1,000 rooms from the 2000-2020 General Plan) • Residential allocation: 4,421 units (net increase of 2,526 units from the 2000-2020 General Plan) While Land Use Alternative C would meet all of the project objectives, the combination of the office allocation in Alternative C together with the other land use allocations in Alternative C would not be as effective as the Planning Commission Recommendation in providing for new hotel space or as balanced as the Planning Commission Recommendation, which includes the lower office allocation in Alternative A, in achieving the project objective of creating a mix of economic development opportunities. Furthermore, the environmental effects from the larger office allocation in Alternative C would be marginally greater than the environmental effects from the office allocation in the Planning Commission Recommendation (which has the same office allocation as Alternative A). That is because the Alternative C office allocation is 3.8 times greater than the office allocation in the Planning Commission Recommendation. Increased allocation to office development would mean more jobs and, as people move to Cupertino to fill those jobs, a higher population. For example, Draft EIR Table 5-2 projects a 70 percent greater increase in jobs and a 75 percent greater increase in population under Alternative C compared to the increases under Alternative B. The increased development and population growth resulting from the Alternative C office allocation would have greater effects on the environment than the office allocation component of the Planning Commission Recommendation and Alternative B. Alternative B would reduce air quality impacts, as described in the analysis of Impact AIR-1, because the Vehicle Miles Traveled (VMT) for Alternative B is lower and reduces the impact to less than significant. See Draft EIR Table 5.5. The VMT for the Planning Commission Recommendation would be similar to Alternative A, with some increase due to the increased hotel allocation. This is because the mix of development in the Planning Commission Recommendation, which includes the same office allocation as Alternative A, has a similar balance of development. In categories where all of the alternatives were found to have significant and unavoidable impacts, namely air quality, noise, and traffic, Land Use C’s office allocation would result in greater environmental impacts, as it represents the greatest amount of development, which would result in higher consumption of non-renewable resources, generate the greatest amount of waste and pollutants, and increase the demand of public facilities and infrastructure. 14 See footnote 5, above. 78 I-36 For the foregoing reasons, Land Use Alternative C is hereby rejected as infeasible. E. Environmentally Superior Alternative In addition to the discussion and comparison of impacts of the Planning Commission Recommendation and the Alternatives, Section 15126.6(e)(2) of the State CEQA Guidelines requires that an “environmentally superior” alternative be selected and the reasons for such a selection be disclosed. The environmentally superior alternative is the alternative that would be expected to create the least significant environmental effects. Identification of the environmentally superior alternative is an informational procedure and the alternative selected may not be the alternative that best meets the goals or needs of Cupertino. As shown in Draft EIR Table 5-5, the impacts associated with each of the four land use scenarios analyzed in this EIR would essentially be the same. As previously stated, this is because the recommended mitigation measures would apply to all of the alternatives, and compliance with the General Plan policies designed to reduce environmental impacts would also apply to all future development in Cupertino. However, as shown in Draft EIR Table 5- 5, for Land Use Alternative B air quality Impact AQ-1 (Conflict with or obstruct implementation of the applicable air quality plan) would be less than significant for Alternative B but would be significant and unavoidable for the other alternatives. That is because the mix of development in Alternative B would increase office square footage, but to all lesser extent than Alternative C, while at the same time increasing the residential allocation unlike Alternative A and the No Project Alternative. While Alternative C represents the maximum extent of residential development anticipated by the Plan Bay Area for Cupertino by 2040, Alternative C’s higher increase in office square footage (4,040,231 square feet compared to the lower office increase in Alternative B of 2,540,231 square feet), together with the total increase in residential allocation, does not reflect a balanced jobs-housing ratio that results in lower per capita VMT when compared to Alternative B. Under Alternative C, land uses allocations in the General Plan would generate 897,419 VMT per day (10.47 miles per service population per day in 2013). Based on the future estimates of VMT per person for Cupertino for year 2040, 1,264,271 VMT per day (10.94 miles per service population per day in 2040) would be generated in Cupertino. Accordingly, the daily VMT in the Project Study Area under Alternative C would increase at a slightly greater rate (40.9 percent) between 2013 and 2040 than would the service population of the Project Study Area (34.8 percent). In comparison, under Alternative B, based on the future estimates of VMT per person for Cupertino for year 2040, 1,097,596 VMT per day (10.24 miles per service population per day in 2040) would be generated in the City. Under Alternative B, daily VMT in the Project Study Area would increase at a slower rate (22.3 percent) between 2013 and 2040 than would the service population of the Project Study Area (25.0 percent). When the VMT increase is less than or equal to the projected population increase, this represents a balanced jobs-housing ratio. 79 I-37 In identifying an Environmental Superior Alternative, the analysis in the EIR is based on the principle that less development would mean reduced effects on the environment. Each incremental increase in development allocations among the alternatives represents increased population and activity which would result in increased noise, air quality, greenhouse gas, traffic, and utilities impacts. Although a number of these impacts would be significant and unavoidable under every alternative, the severity of the significant and unavoidable impacts would vary according to the development allocations within a given alternative. For example, while Land Use Alternative B would reduce Air Quality Impact AQ-1, as described above in Section VIII.D, the No Project Alternative would be the environmentally superior alternative because it would not allow for new development to occur beyond what is currently planned for in the 2000-2020 General Plan, which would result in the least amount of development in the City and thereby reduce the consumption of renewable resources (e.g., lumber and water) and nonrenewable resources (e.g., fossil fuels, natural gas, and gasoline). Less development would place fewer demands on public service providers (which could require new facilities), would require fewer road, sewer, water and energy infrastructure improvements, and would generate less waste, which would overall reduce impacts on the environment. In accordance with State CEQA Guidelines Section 15126.6(e)(2), if the environmentally superior alternative is the No Project alternative, the EIR shall also identify an environmentally superior alternative from among the other alternatives. Accordingly, the environmentally superior alternative would be Land Use Alternative A, because less development would occur compared to Land Use Alternative B, Land Use Alternative C, and the Planning Commission Recommendation. Under Land Use Alternative A, no new commercial space, hotel rooms or residential units would be permitted beyond the allocations in the current General Plan. For the foregoing reasons, Alternative A is considered the environmentally superior alternative. IX. INCORPORATION BY REFERENCE These findings incorporate the text of the Final EIR for the Project, the Mitigation Monitoring and Reporting Program, City staff reports relating to the Project and other documents relating to public hearings on the Project, by reference, in their entirety. Without limitation, this incorporation is intended to elaborate on the scope and nature of mitigation measures, project and cumulative impacts, the basis for determining the significance of impacts, the comparison of the alternatives to the Project, the determination of the environmentally superior alternative, and the reasons for approving the Project. 80 I-38 X. RECORD OF PROCEEDINGS Various documents and other materials related to the Project constitute the record of proceedings upon which the City bases its findings and decisions contained herein. Those documents and materials are located in the offices of the custodian for the documents and materials, which is the City of Cupertino Community Development Department, Cupertino City Hall, 10300 Torre Avenue, Cupertino, CA 95014-3202. XI. NO RECIRCULATION REQUIRED State CEQA Guidelines Section 15088.5 requires a lead agency to recirculate an EIR for further review and comment when “significant new information” is added to the EIR after public notice is given of the availability of the Draft EIR but before certification. No significant new information was added to the Draft EIR as a result of the public comment process. The Final EIR responds to comments, and clarifies, amplifies and makes insignificant modifications to the Draft EIR. The Final EIR does not identify any new significant effects on the environment or a substantial increase in the severity of an environmental impact. The EIR analyzes full buildout of 2040 growth for Cupertino as projected in Plan Bay Area. The Planning Commission Recommendation consists of the same commercial and hotel development allocations that were analyzed in the EIR for Alternative C, the same office allocation as the amount analyzed in the EIR for Alternative A, and no residential allocation. The Housing Element sites in the Planning Commission Recommendation are nine of the 19 sites analyzed in the EIR. In addition, some development is reassigned among the sites resulting in fewer units than analyzed in the EIR on some sites and more on one other site, the maximum height limits are either the same as or reduced from Alternative C except at two locations where they are increased by a minor amount, and the maximum densities are either the same as or reduced from Alternative C except at two locations where they are increase by a minor amount. Accordingly, most portions of the Planning Commission Recommendation were analyzed in the EIR, either as part of Alternative C or as part of Alternative A. The elimination of the residential allocation will not have a new or substantially more severe significant effect on the environment because residential development will be allowed at the locations, densities and intensities as provided for in the existing General Plan and Zoning Ordinance, as amended by the Project and analyzed in the EIR. The minor increases in maximum building heights at two locations and densities at one location will not have any new significant effects on the environment or a substantial increase in the severity of an environmental impact for the reasons stated in Section II.A and II.B, above. For the foregoing reasons, recirculation of the Final EIR is not required. 81 I-39 XII. STATEMENT OF OVERRIDING CONSIDERATIONS As set forth above, the City has found that the Project will result in project and cumulative significant adverse environmental impacts related to air quality, noise, and traffic and transportation that cannot be avoided following adoption, incorporation into the Project, and implementation of mitigation measures described in the EIR. In addition, there are no feasible project alternatives that would mitigate or avoid all of the Project’s significant environmental impacts. Section 15093(b) of the State CEQA Guidelines provides that when the decision of the public agency results in the occurrence of significant impacts that are not avoided or substantially lessened, the agency must state in writing the reasons to support its actions. See also Public Resources Code Section 21081(b). Having balanced the economic, legal, social, technological or other benefits of the Project, including region-wide or statewide environmental benefits, against its significant and unavoidable environmental impacts, the City finds that the Project benefits outweigh its unavoidable adverse environmental effects, and that the adverse environmental effects are therefore acceptable. The following statement identifies the reasons why, in the City’s judgment, specific benefits of the Project outweigh the significant and unavoidable effects. The substantial evidence supporting the benefits of the Project can be found in the preceding sections of these Findings, in the Project itself, and in the record of proceedings as defined in Section X, above. The City further finds that each of the project benefits discussed below is a separate and independent basis for these findings. The reasons set forth below are based on the Final EIR and other information in the administrative record. 1) The Vision Statement in the General Plan states that “Cupertino aspires to be a balanced community with quiet and attractive residential neighborhoods; exemplary parks and schools; accessible open space areas, hillsides and creeks; and a vibrant, mixed use ‘Heart of the City.’ Cupertino will be safe, friendly, healthy, connected, walkable, bikeable and inclusive for all residents and workers, with ample places and opportunities for people to interact, recreate, innovate and collaborate.” In incorporating the office allocation from Land Use Alternative A and the commercial and hotel allocations from Land Use Alternative C, the Project provides the City with a balanced mix of economic development opportunities while seeking to lessen significant impacts by pursuing the highest possible levels of development. 2) The Project provides the City with the commercial development allocation it needs to increase sales and avoid retail leakage in the trade area, as recommended on page 50 of the General Plan Amendment Market Study (BAE Urban Economics, February 13, 2014), and as set forth in the project objectives. 3) The Project provides for economic growth by creating employment-related land uses. This will attract new businesses and allow existing businesses to stay and grow within 82 I-40 the City, improve sales tax and property tax revenue to help the City maintain a healthy fiscal balance to provide its residents with high quality services. 4) The Project concentrates growth along the City’s major transportation corridors and in the City’s employment centers, which are areas that are within walking distance/bus distance of large employment areas. Encouraging development in existing urbanized areas results in fewer impacts from the construction of new infrastructure, maximizes use of existing impervious surfaces, provides multi-modal transportation opportunities, and reduces miles traveled, which translates into air quality benefits. 5) The Project concentrates growth at locations with existing uses and, as a result, potential future development under the Project would consist largely of either redevelopment of existing building, selective demolition of existing structures and replacement with new construction, or new infill development adjacent to existing uses, all of which would serve to lessen environmental impacts. 6) The Project policies concentrating growth along transportation corridors and in employment centers contributes to community goals of protecting the City’s neighborhoods and connectivity. 7) The Project includes policies that encourage conservation of water and energy resources in conformance with the City’s sustainability goals. 8) The Project is in conformance with the principles of planning sustainable communities by meeting both the present and future housing needs of the City, and fulfills the City Council’s charge to prepare a Housing Element. 9) The Project is consistent with key planning documents, including Plan Bay Area, which is the Bay Area’s Regional Transportation Plan (RTP)/Sustainable Community Strategy (SCS), as well as SB 375, the Sustainable Communities and Climate Protection Act. 10) The Project meets the City’s Regional Housing Needs Allocation (RHNA) of 1,064 units, and provides a moderate surplus above the City’s housing need, or approximately 1,400 units. 11) The Project provides opportunities for increased building heights in key Nodes and Gateways. 12) The Project provides for revitalizing the Vallco Shopping Mall and transforming it into a locally and regionally significant retail, employment, and entertainment destination, which would become the “downtown” of Cupertino. 83 I-41 13) The Gateways and Nodes located within some of the Project’s Special Areas represent key locations in the City that, with the use of design elements, such as buildings, arches, fountains, banners, signage, special lighting, landscaping and public art, have the opportunity to create a memorable impression of Cupertino. These key locations are essential for providing residents, visitors, and workers an attractive, friendly, and comfortable place with inviting active pedestrian spaces and services. XIII. SUMMARY 1. Based on the foregoing Findings and the information contained in the record, the City has made one or more of the following Findings with respect to each of the significant environmental effects of the Project: a. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant environmental effects identified in the Final EIR. b. Those changes or alterations are within the responsibility and jurisdiction of another public agency and have been, or can and should be, adopted by that other public agency. c. Specific economic, legal, social, technological, or other considerations, make infeasible the mitigation measures or alternatives identified in the Final EIR that would otherwise avoid or substantially lessen the identified significant environmental effects of the Project. 2. Based on the foregoing Findings and the information contained in the record, the City determines that: a. All significant effects on the environment due to the approval of the Project have been eliminated or substantially lessened where feasible. b. Any remaining significant effects on the environment found to be unavoidable are acceptable due to the factors described in the Statement of Overriding Considerations, above. 84 - 1 - CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 14-211 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO APPROVING A GENERAL PLAN AMENDMENT TO REALLOCATE AND REPLENISH DEVELOPMENT ALLOCATION, AMEND THE GENERAL PLAN LAND USE MAP AND DEVELOPMENT STANDARDS, COMPLY WITH STATE LAW AND REORGANIZATION AND IMPROVE PRESENTATION AND READABILITY SECTION I: PROJECT DESCRIPTION Application No: GPA-2013-01 Applicant: City of Cupertino Location: Citywide SECTION II: ENVIRONMENTAL REVIEW PROCESS WHEREAS pursuant to City Council direction to initiate a project to replenish, reallocate and increase citywide development allocations in order to plan for anticipated future development activity while keeping with the community’s character, goals, and objectives and to consolidate development requests by several property owners for amendments to the General Plan, under a comprehensive community vision, and WHEREAS, pursuant to State Housing Law, the City Council has directed staff to update the Housing Element of the General Plan and make associated zoning amendments to comply with State Law; and WHEREAS, immediately prior to the Council’s consideration of this rezoning, and following the Commission’s recommendation, the Council adopted Resolution No. 14-211, adopting a General Plan Amendment covering the properties which are the subject of this rezoning ordinance; and WHEREAS, the rezoning will be consistent with the City's General Plan land use map, proposed uses and surrounding uses; and WHEREAS, the Rezoning application is part of the General Plan Amendment, Housing Element Update and Associate Rezoning, all as fully described and analyzed in the June 2014 General Plan Amendment, Housing Element Update, and Associated Rezoning Project Environmental Impact Report (“Draft EIR”) (State Clearinghouse No. 2014032007), as amended by text revisions in the August 2014 General Plan Amendment, Housing Element Update and Associated Rezoning Project EIR Response to Comments Document (“Response to Comments Document”) and the Supplemental Text Revisions dated October 8, 2014 (together, the “Final EIR”); WHEREAS, the Final EIR was presented to the Planning Commission on September 9, 2014 at a Planning Commission Study Session; and 85 - 2 - WHEREAS, the Final EIR was presented to the City Council on October 7, 2014 at a City Council Study Session; and WHEREAS, based on substantial evidence in the administrative record, the Planning Commission has recommended that the City Council certify that the Final EIR has been completed in compliance with the California Environmental Quality Act, Public Resources Code Section 21000 et seq., and reflects the independent judgment and analysis of the City, adopt the Findings and Statement of Overriding Considerations for the Project, and adopt the mitigation measures for the Project that are identified in Findings; and WHEREAS, the necessary public notices have been given as required by the procedural ordinances of the City of Cupertino and the Government Code, and the Planning Commission held public hearings on October 14, 2014 and October 20, 2014 to consider the project; and WHEREAS, based on substantial evidence in the administrative record, on October 14, 2014 the Planning Commission recommended that the City Council certify that the Final EIR has been completed in compliance with the California Environmental Quality Act, Public Resources Code Section 21000 et seq., and reflects the independent judgment and analysis of the City, adopt the Findings and Statement of Overriding Considerations, and implement all of the mitigation measures for the Project that are within the responsibility and jurisdiction of the City that are identified in Findings; and WHEREAS, on October 20, 2014, the Planning Commission recommended on a 4-0-1 (Takahashi absent) vote that the City Council adopt the General Plan Amendment (GPA-2013-01) (Resolution no. 6761); authorize staff to forward the Draft Housing Element to the State Department of Housing and Community Development for review and certification (GPA-2013- 02); approve the prioritized list of potential Housing Element sites in the event amendments are needed to the proposed Housing Element sites upon HCD review (Resolution no. 6762); approve the Zoning Map Amendments, Z-2014-0X, in substantially similar form to the Resolution presented (Resolution no. 6763); approve the Municipal Code Amendments to make changes to conform to the General Plan and Housing Element and other clean up text edits (MCA-2014-01) (Resolution no. 6764); approve the Specific Plan Amendments, SPA-2014-01, in substantially similar form to the Resolution presented (Resolution no. 6765); and WHEREAS, on November 10, 2014, upon due notice, the City Council has held at least one public hearing to consider the amendments to the General Plan; and WHEREAS, the City Council of the City of Cupertino is the decision-making body for this Resolution; WHEREAS, after consideration of evidence contained in the entire administrative record, at the public hearing on November 10, 2014, the City Council adopted Resolution No. 14-210 certifying the EIR, adopting Findings and a Statement of Overriding Considerations, adopting Mitigation Measures, and adopting of a Mitigation Monitoring and Reporting Program. WHEREAS, prior to taking action on this Resolution, the City Council has exercised its independent judgment in carefully considering the information in the EIR and finds that scope 86 - 3 - of this Resolution falls within the previously certified EIR and that the rest of the amendments proposed in the Resolution do not constitute a project under CEQA, are exempt and no further environmental review is required; and NOW, THEREFORE: After careful consideration of the, maps, facts, exhibits, testimony and other evidence submitted in this matter, the City Council hereby finds: 1. The allocation in the General Plan do not limit the number of residences which may be built on an annual basis; 2. The allocations are consistent with the Association of Bay Area Government’s (ABAG) projections to 2040 and are intended to meet the City’s appropriate share of the Regional Housing Needs Allocation (RHNA); 3. The General Plan is necessary to prescribe reasonable controls and standards for affected land uses to insure compatibility and integrity of those uses with other uses; 4. The General Plan provides reasonable property development rights while protecting environmentally sensitive land uses and species; 5. The General Plan identifies standards and policies for use throughout the City; and 6. The General Plan is necessary to protect the general public health, safety, or welfare of the community as a whole. NOW, THEREFORE, BE IT RESOLVED: After careful consideration of the, maps, facts, exhibits, testimony and other evidence submitted in this matter, the City Council hereby adopts: 1. Amendments to the General Plan (Application No. GPA-2013-01) as shown in Exhibit GPA-1 and 2. Changes to the Land Use Map as shown in Exhibit GPA-2. PASSED AND ADOPTED this 10th day of November 2014, at a Meeting of the City Council of the City of Cupertino by the following roll call vote: AYES: NOES: ABSTAIN: ABSENT: ATTEST: APPROVED: Grace Schmidt Gilbert Wong City Clerk Mayor, City of Cupertino 87 COMMUNITYVISION 2040 Cupertino’s General Plan for Community-wide Change, Mobility, Sustainability and Health Public Review Draft | October 2014 EXHIBIT GPA-1 88 89 ACKNOWLEDGMENTS City Council Gilbert Wong, Mayor Rod Sinks, Vice Mayor Barry Chang, Council Member Orrin Mahoney, Council Member Mark Santoro, Council Member Planning Commission Paul Brophy, Chair Winnie Lee, Vice Chair Don Sun, Commissioner Alan Takahashi, Commissioner Margaret Gong, Commissioner City Staff David Brandt, City Manager Aarti Shrivastava, Assistant City Manager/Community Development Director Carol Korade, City Attorney Colleen Winchester, Assistant City Attorney Gary Chao, Assistant Community Development Director Piu Ghosh, Senior Planner Rebecca Tolentino, Senior Planner Christopher Valenzuela, Senior Planner George Schroeder, Associate Planner Tiffany Brown, Associate Planner Angela Tsui, Economic Development Manager Carol Atwood, Director of Recreation and Community Services Rick Kitson, Director of Public Affairs Timm Borden, Public Works Director Albert Salvador, Building Official Chad Mosely, Senior Civil Engineer David Stillman, Senior Traffic Engineer Teri Gerhardt, GIS Manager Adam Araza, GIS Department 90 Aki Honda Snelling Alex Wykoff Andrea Sanders Alyssa Carlsen Beth Ebben Cheri Donnelly Chylene Osborne Colleen Lettire Diana Pancholi Donna Henriques Erin Cooke Erwin Ching Grace Schmidt Hella Sanders Jeff Greef Julia Kinst Kaitie Groeneweg Kirsten Squarcia Kristina Alfaro Louis Sarmiento Melissa Names Melissa Tronquet Michelle Combs Pete Coglianese Rei Delgado Robert Kim Ron Bullock Ryan Roman Simon Vuong Stephen Rose Sylvia Mendez Tiffanie Cardenas Winnie Pagan MIG, Inc. Daniel Iacofano, CEO/Principal Chris Beynon, Principal Laura Stetson, Principal Dan Amsden, Senior Project Manager Ellie Fiore, Outreach and Policy Specialist Genevieve Sharrow, Project Associate Jeff Liljegren, Project Associate Marissa Reilly, Project Associate Jamillah Jordan, Project Associate Lillian Jacobson, Research Assistant BAE Urban Economics Janet Smith-Heimer, President David Shiver, Principal Ray Kennedy, Vice President Stephanie Hagar, Senior Associate Greensfelder CRE David Greensfelder, Managing Principal Veronica Tam & Associates Veronica Tam, Principal Jessica Suimanjaya, Associate PlaceWorks Steve Noack, Principal Terri McCracken, Senior Associate Hexagon Transportation Gary Black, President Jill Hough, Vice President CITY STAFF (Community Outreach)CONSULTANT TEAM 91 CONTENTS Chapter 1: Introduction...................................................... I-1 Purpose of Community Vision 2040............................................. I-3 Vision Statement........................................................................... I-4 Guiding Principles......................................................................... I-4 Organization of the Document..................................................... I-8 Community Vision 2040 Adoption................................................ I-9 Community Vision 2040 Implementation..................................... I-10 Chapter 2: Planning Areas................................................. PA-1 Introduction....................................................................................PA-3 Special Areas..................................................................................PA-4 Neighborhoods..............................................................................PA-18 Chapter 3: Land Use and Community Design Element...... LU-1 Introduction................................................................................... LU-3 Context.......................................................................................... LU-4 Looking Forward............................................................................ LU-11 Citywide Goals and Policies.......................................................... LU-13 Planning Areas Goals and Policies................................................ LU-78 Chapter 4: Housing Element.............................................. HE-1 Introduction................................................................................... HE-3 Housing Needs Assessment......................................................... HE-4 Regional Housing Needs and Allocations.................................... HE-15 Housing Resources........................................................................ HE-16 Housing Plan.................................................................................. HE-18 Chapter 5: Mobility Element.............................................. M-1 Introduction....................................................................................M-3 Context.......................................................................................... M-4 Looking Forward............................................................................ M-14 Goals and Policies......................................................................... M-16 92 CONTENTS Chapter 6: Environmental Resources................................. ES-1 Introduction................................................................................... ES-3 Context.......................................................................................... ES-4 Looking Forward............................................................................ ES-26 Goals and Policies......................................................................... ES-27 Chapter 7: Health and Safety ............................................HS-1 Introduction................................................................................... HS-3 Context......................................................................................... HS-4 Looking Forward........................................................................... HS-18 Chapter 8: Infrastructure.................................................... INF-1 Introduction................................................................................... INF-3 Context.......................................................................................... INF-4 Looking Forward............................................................................ INF-9 Goals and Policies......................................................................... INF-11 Chapter 9: Recreation, Parks and Community Service Element.............................................................................. RPC-1 Introduction................................................................................... RPC-3 Context.......................................................................................... RPC-4 Looking Forward............................................................................ RPC-21 Goals and Policies......................................................................... RPC-23 Technical Appendices Appendix A: Land Use Definitions............................................... A-1 Appendix B: Housing Element Technical Report......................... B-1 Appendix C: Air Quality.................................................................C-1 Appendix D: Community Noise Fundamentals............................ D-1 Appendix E: Geologic and Seismic Hazards.................................E-1 Appendix F: Slope Density............................................................ F-1 93 INTRODUCTION Chapter 1 94 95 I-3 CHAPTER 1 Introduction PURPOSE OF COMMUNITY VISION 2040 Community Vision 2040 is a roadmap to the future that encompasses the hopes, aspirations, values and dreams of the Cupertino community. The underlying purpose of this document is to establish the policy and regulatory framework necessary to build a great community that serves the needs of its residents, maximizes the sense of connection between neighborhoods and enhances Cupertino as a great place to live, work, visit and play. Community Vision 2040 provides a framework for integrating the aspirations of residents, businesses, property owners and public officials into a comprehensive strategy for guiding future development and managing change. It describes long-term goals and guides daily decision making by the City Council and appointed commissions. This document functions as the City of Cupertino’s State-mandated General Plan, and covers a time frame of 2014–2040. As such, the goals, policies and strategies contained in this document lay the foundation for ensuring there is appropriate land use and community design, transportation networks, housing, environmental resources and municipal services established between now and 2040. Due to the breadth of topics covered in Community Vision 2040, conflicts between mutually-desirable goals are inevitable. For instance, increased automobile mobility may conflict with a safe, walkable community. This document reconciles these conflicts in the interest of building a cohesive community. Per State law, every goal and policy in this plan has equal weight. The City recognizes that the interests of residents of a particular street or neighborhood may need to be balanced with the overall needs and potentially greater goal of building a community. These are conscious choices that the City makes in the interest of building community. CONTENTS I-3 Purpose of Community Vision 2040 I-4 Vision Statement I-4 Guiding Principles I-8 Organization of the Document I-9 Community Vision 2040 Adoption I-10 Community Vision 2040 Implementation 96 I-4 COMMUNITY VISION 2040 City of Cupertino VISION STATEMENT In order to prioritize goals and actions, the City developed an overarching vision statement based on extensive community input received during the 2013-14 General Plan Amendment process. This input culminated in A Vision for Cupertino, shown on the following page, which reflects ideas, thoughts and desires from residents, local business and property owners, study area stakeholders, elected and appointed officials, and other members of the Cupertino community. This updated vision expresses the community’s desires for Cupertino’s future. It describes the community’s overall philosophy regarding the character and accessibility of existing and new neighborhoods and mixed-use corridors. Ultimately, all goals, policies and strategies contained in this document must be consistent with the vision statement. GUIDING PRINCIPLES The Guiding Principles (illustrated on pages 1-6 and 1-7) provide additional detail about Cupertino’s desired future necessary to fully articulate the ideas contained in the vision statement. Similarly, the Guiding Principles were developed based on extensive community input. The Cupertino community was integral to the formation of A Vision for Cupertino through participation and input during numerous citywide workshops, meetings, hearings and online surveys 97 I-5 CHAPTER 1 Introduction A Vision for Cupertino Cupertino aspires to be a balanced community with quiet and attractive residential neighborhoods; exemplary parks and schools; accessible open space areas, hillsides and creeks; and a vibrant, mixed-use “Heart of the City.” Cupertino will be safe, friendly, healthy, connected, walkable, bikeable and inclusive for all residents and workers, with ample places and opportunities for people to interact, recreate, innovate and collaborate. Cupertino and the Santa Clara Valley seen from the Rancho San Antonio Open Space Preserve 98 I-6 COMMUNITY VISION 2040 City of Cupertino #6: Support Vibrant and Mixed-Use Businesses Ensure that Cupertino’s major mixed-use corridors and commercial nodes are vibrant, successful, attractive, friendly and comfortable with inviting active pedestrian spaces and services that meet the daily needs of residents and workers. #5: Ensure a Balanced Community Offer residents a full range of housing choices necessary to accommodate the changing needs of a demographically and economically diverse population, while also providing a full range of support uses including regional and local shopping, education, employment, entertainment, recreation, and daily needs that are within easy walking distance. #4: Enhance Mobility Ensure the efficient and safe movement of cars, trucks, transit, pedestrians, bicyclists and disabled persons throughout Cupertino in order to fully accommodate Cupertino’s residents, workers, visitors and students of all ages and abilities. #3: Improve Connectivity Create a well-connected and safe system of trails, pedestrian and bicycle paths, sidewalks and streets that weave the community together, enhance neighborhood pride and identity, and create access to interesting routes to different destinations. #2: Improve Public Health and Safety Promote public health by increasing community-wide access to healthy foods; ensure an adequate amount of safe, well-designed parks, open space, trails and pathways; and improve safety by ensuring all areas of the community are protected from natural hazards and fully served by police, fire, paramedic and health services. #1: Develop Cohesive Neighborhoods Ensure that all neighborhoods are safe, attractive and include convenient pedestrian and bicycle access to a “full-service” of local amenities such as parks, schools, community activity centers, trails, bicycle paths and shopping. Guiding Principles 99 I-7 CHAPTER 1 Introduction #10: Preserve the Environment Preserve Cupertino’s environment by enhancing or restoring creeks and hillsides to their natural state, limiting urban uses to existing urbanized areas, encouraging environmental protection, promoting sustainable design concepts, improving sustainable municipal operations, adapting to climate change, conserving energy resources and minimizing waste. #9: Support Education Preserve and support Cupertino’s excellent public education system by partnering with local school districts and De Anza College to improve school facilities and infrastructure, developing quality City facilities and programs that enhance learning, and expanding community-wide access to technology infrastructure. #8: Embrace Diversity Celebrate Cupertino’s diversity by offering a range of housing, shopping and community programs that meet the needs of the full spectrum of the community, while ensuring equal opportunities for all residents and workers regardless of age, cultural or physical differences. #7: Ensure Attractive Community Design Ensure that buildings, landscapes and streets are attractively designed and well maintained so they can complement the overall community fabric by framing major streets and offering desirable and active pedestrian spaces. #11: Ensure Fiscal Self Reliance Maintain fiscal self-reliance in order to protect the City’s ability to deliver essential, high-quality municipal services and facilities to the community. #12: Ensure a Responsive Government Continue to be a regional leader in accessible and transparent municipal government; promote community leadership and local partnerships with local and regional agencies; and remain flexible and responsive to changing community needs. 100 I-8 COMMUNITY VISION 2040 City of Cupertino ORGANIZATION OF THE PLAN California state law requires that each city and county adopt a General Plan for the “physical development of the county or city, and any land outside its boundaries which bears relation to its planning.” The role of the General Plan is to act as a community’s “constitution,” a basis for rational decisions regarding long-term physical development and incremental change. Community Vision 2040 expresses the community’s development and conservation goals, and embodies public policy relative to the distribution of future land uses, both public and private. Every General Plan is also required to address a collection of seven “elements” or subject categories. The City has the authority to address these elements in whatever organization makes the most sense for Cupertino. The following table identifies how the sections of the plan address each State- required element. Each chapter of Community Vision 2040 directly implements the vision statement and Guiding Principles that were developed through an extensive community process COMMUNITY VISION 2040 CHAPTER STATE-REQUIRED TOPICS OR ELEMENTS 1. Introduction not applicable 2. Planning Areas not applicable 3. Land Use and Community Design Land Use 4. Housing Housing 5. Mobility Circulation 6. Environmental Resources and Sustainability Conservation, Open Space 7. Health and SafetyNoise, Safety 8. Public Infrastructure(optional element) 9. Recreation and Community Services (optional element) 101 I-9 CHAPTER 1 Introduction Each topical chapter, or “Element,” of Community Vision 2040 includes an introduction, background context and information, and a summary of key opportunities or objectives looking forward. They also include topical goals, policies and strategies that function in three unique ways: • Goal: a broad statement of values or aspirations needed to achieve the vision. • Policy: a more precise statement that guides the actions of City staff, developers and policy makers necessary to achieve the goal. • Strategy: a specific task that the City will undertake to implement the policy and work toward achieving the goals. COMMUNITY VISION 2040 ADOPTION Community Vision 2040 is a living document, and can be adopted or modified over time as community needs change. Each amendment needs to include a public review process and environmental impact analysis. Public review occurs prior to public hearings through community meetings, study sessions and advisory committee meetings. Public hearings allow the community to express its views prior to City Council approval. State law limits the number of General Plan amendments to four per year. Cupertino ordinances require that the City Council determine if a public hearing should be set to consider a General Plan amendment. 102 I-10 COMMUNITY VISION 2040 City of Cupertino COMMUNITY VISION 2040 IMPLEMENTATION Community Vision 2040 is the foundation for planning in Cupertino. All physical development must be consistent with it. State law also requires that zoning be consistent with the plan. The various goals, policies and strategies are carried out through a myriad of City plans and approval procedures, such as special planning areas, use permits, subdivisions, the Capital Improvement Program and park planning. The annual review of Community Vision 2040 provides the opportunity to evaluate the City’s progress in implementing the plan and to assess if mitigation measures are being followed and if new policy direction should be considered. 103 2 PLANNING AREAS Chapter 2 104 PA-2 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT PA-2 Housing Commission Attachment B 105 PA-3 CHAPTER 2 Planning Areas REVISED PUBLIC DRAFT INTRODUCTION Cupertino benefits from having many established and vibrant areas—each with its own unique function, charac- ter, uses and services. Community Vision 2040 organizes the city into 21 distinct Planning Areas, divided into two categories: 1. Special Areas that are expected to transition over the life of the General Plan and 2. Neighborhoods where future changes are expected to be minimal This chapter provides an overview of each Planning Area, including its current context and future vision. Specific goals, policies and strategies for each area are included in the various topical elements of the General Plan (e.g., Chapters 3 through 8). CONTENTS PA-3 Introduction PA-4 Special Areas Heart of the City Vallco Shopping District North Vallco Park North De Anza South De Anza Homestead Bubb Road Monta Vista Village Other Non-Residential/ Mixed-Use Areas PA-18 Neighborhoods Oak Valley Creston-Pharlap Inspiration Heights Monta Vista North Monta Vista South Homestead Villa Garden Gate Jollyman North Blaney South Blaney Rancho Rinconada Fairgrove 106 PA-4 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT SPECIAL AREAS Cupertino is defined by its four major roadways: Homestead Road, Wolfe Road, De Anza Boulevard and Stevens Creek Boulevard. These major mixed-use corridors have been the center of retail, commercial, office and multi-family housing in Cupertino for decades. They act as the “spines” of the community–connecting residential neighborhoods to major employment centers, schools and colleges, civic uses, parks, highways and freeways, and adjacent cities. In order to support local and regional commercial, office and housing needs, each of these corridors must be improved. They should be enhanced with more pedestrian, bicycle and transit facilities; supported by focused development standards; and encouraged to redevelop in order to meet the current and future needs of the community. As shown in Figure PA-1, there are nine Special Areas with- in Cupertino. Each Special Area is located along one of the four major mixed-use corridors in the city, which represent key areas within Cupertino where future development and reinvestment will be focused. The following is a summary of the location, major characteristics, uses and vision for each of the city’s nine Special Areas. Each major mixed-use corridor in Cupertino has a unique urban feel, streetscape design and land use characteristic. Above, from top to bottom, are Homestead Road, Wolfe Road, Stevens Creek Boulevard, De Anza Boulevard (north) and De Anza Boulevard (south). 107 PA-5 CHAPTER 2 Planning Areas REVISED PUBLIC DRAFT North Vallco Park Special Area Heart of the City Special Area South De Anza Special Area North De Anza Special Area Homestead Special Area Vallco Shopping District Special Area Bubb Road Special Area Monta Vista Village Special Area west crossroads central east South Vallco Park Gateway City Center Node Oaks Gateway North Crossroads Node North Vallco Gateway Stelling Gateway North De Anza Gateway Civic Center Node De Anza College Node Community Recreation Node Sunnyvale Santa Clara San Jose Los Altos 01000 0500 20003000 0 0.5 1Mile 1000 Feet Meters Special Areas Legend City Boundary Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas Heart of the City Vallco Shopping District North Vallco Park North De Anza South De Anza Homestead Bubb Road Monta Vista Village Figure PA-1 Special Areas 108 PA-6 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT The Heart of the City is the key commercial, office and residential Special Area that functions as the “downtown” of Cupertino Heart of the City Context The Heart of the City Special Area is a key mixed-use, commercial corridor in Cupertino. The area encom- passes approximately 635 acres along Stevens Creek Boulevard between Highway 85 and the eastern city limit. Development within this Special Area is guided by the Heart of the City Specific Plan which is intended to cre- ate a greater sense of place, more community identity, and a positive and memorable experience for residents, workers and visitors of Cupertino. The Heart of the City Specific Plan area includes five specific subareas, each with unique characteristics, land uses and streetscape elements. The subareas include: West Stevens Creek Boulevard; Crossroads; Central Stevens Creek Boulevard; City Center; and East Stevens Creek Boulevard. The West Stevens Creek Boulevard subarea is located between Highway 85 and Stelling Road. The primary use for this area is quasi-public/public facilities, with support- ing uses including mixed commercial/residential. The De Anza College Node defines the southern half of the West Stevens Creek Boulevard subarea. Also included within this area are the Oaks Gateway and Community Recreation Node consisting of Memorial Park, the Senior Center, Sports Center and Quinlan Community Center. The Crossroads subarea is located between Stelling Road and De Anza Boulevard and is the historic core of Cupertino. This area consists of specialty shops, grocery stores and restaurants that form a strong central focal point. The primary use in this area is commercial/retail, with com- mercial office above the ground level allowed as a second- ary use. Limited residential is also allowed as a supporting use per the Housing Element. The North Crossroads Node encompasses the northern half of the subarea. The North Crossroads Node is a key commercial/retail destination along Stevens Creek Boulevard and includes many newer, smaller scale stores and restaurants 109 PA-7 CHAPTER 2 Planning Areas REVISED PUBLIC DRAFT The Central Stevens Creek Boulevard subarea is located on the north side of Stevens Creek Boulevard between De Anza Boulevard and Torre Avenue, and on the north and south sides of Stevens Creek Boulevard between Torre Avenue and Portal Avenue. The primary use for this area is commercial/commercial office, with office above ground level as the secondary use. Residential/residential mixed uses are allowed as a supporting use. The City Center subarea is located south of the Central Stevens Creek Boulevard subarea, between De Anza and Torre Avenue/Regnart Creek. The primary use for this area is office/residential/hotel/public facilities/commercial retail/ mixed-uses. This subarea is further defined into the City Center Node and Civic Center Node. The City Center Node includes Cali Plaza. The Civic Center Node includes City Hall, Cupertino Community Hall, Cupertino Public Library, as well as the Library Plaza and Library Field. The East Stevens Creek Boulevard subarea is located at the east end of the Heart of the City Specific Plan area and extends from Portal Avenue to the eastern city limit. The area is largely defined by the South Vallco Park Gateway immediately east of the Vallco Shopping District, which includes Nineteen 800 (formerly know as Rosebowl), The Metropolitan and Main Street developments. This area is intended as a regional commercial district with retail/com- mercial/ office as the primary uses. Office above ground level retail is allowed as a secondary use, with residential/ residential mixed-use as a supporting use per the Housing Element. The City Center Node serves as a medium to higher scale mixed-use commercial, employment and residential center The South Vallco Park Gateway area includes a mix of office uses, such as low rise Apple office buildings, as well as some of the city’s newest mixed-use projects 110 PA-8 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Vision The Heart of the City area will continue being a focus of commerce, community identity, social gathering and pride for Cupertino. The area is envisioned as a tree-lined boulevard that forms a major route for automobiles, but also supports walking, biking and transit. Each of its five subareas will contribute their distinctive and unique charac- ter, and will provide pedestrian and bicycle links to adjacent neighborhoods through side street access, bikeways and pathways. While portions of the area is designated as a Priority Development Area (PDA), which allows some higher intensity near gateways and nodes, development will continue to support the small town ambience of the com- munity. The Stevens Creek Boulevard corridor will continue to function as Cupertino’s main mixed-use, commercial and retail corridor. Residential uses, as allowed per the Housing Element, should be developed in the “mixed-use village” format described later in the Land Use and Community Design Element. The Civic Center Node will continue to serve as the center of City government with civic, library and recreational amenities The Heart of the City will continue to be a focus for citywide commerce, community identity and social gathering 111 PA-9 CHAPTER 2 Planning Areas REVISED PUBLIC DRAFT Vallco Shopping District Context The Vallco Shopping District Special Area encompasses Cupertino’s most significant commercial center, formerly known as the Vallco Fashion Park. This Special Area is located between Interstate 280 and Stevens Creek Boulevard in the eastern part of the city. The North Blaney neighborhood, an established single-family area, is adjacent on the west side of the Vallco Shopping District. Wolfe Road bisects the area in a north-south direction, and divides Vallco Shopping District into distinct subar- eas: Vallco Shopping District Gateway West and Vallco Shopping District Gateway East. In recent years there has been some façade improvement to the Vallco Fashion Mall; however, there has been no major reinvestment in the mall for decades. Reinvestment is needed to upgrade or replace older buildings and make other improvements so that this commercial center is more competitive and better serves the community. Currently, the major tenants of the mall include a movie theater, bowling alley and three national retailers. The Vallco Shopping District is identified as a separate Special Area given its prominence as a regional commercial destination and its importance to future plan- ning/redevelopment efforts expected over the life of the General Plan. Vision The Vallco Shopping District will continue to function as a major regional and community destination. The City envisions this area as a new mixed-use “town center” and gateway for Cupertino. It will include an interconnected street grid network of bicycle and pedestrian-friendly streets, more pedestrian-oriented buildings with active uses lining Stevens Creek Boulevard and Wolfe Road, and publicly-accessible parks and plazas that support the New development in the South Vallco Park area should be pedestrian-oriented 112 PA-10 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT pedestrian-oriented feel of the revitalized area. New devel- opment in the Vallco Shopping District should be required to provide buffers between adjacent single-family neighbor- hoods in the form of boundary walls, setbacks, landscaping or building transitions. Improving circulation and connectivity, including pedestrian and bicycle mobility, is a key vision for future redevelopment within the Vallco Shopping District 113 PA-11 CHAPTER 2 Planning Areas REVISED PUBLIC DRAFT North Vallco Park Context The North Vallco Park Special Area encompasses 240 acres and is an important employment center for Cupertino and the region. The area is bounded by Homestead Road to the north and Interstate 280 to the south. The eastern edge is defined by the properties that line the eastern frontage of Tantau Avenue, and the western edge includes the com- mercial development west of Wolfe Road. The North Vallco Gateway is located within this Planning Area, and includes a medium-density multi-family residential project east of Wolfe Road and two hotels and the Cupertino Village Shopping Center west of Wolfe Road. Cupertino Village offers cafes and restaurants for nearby workers and serves as a village center for the residential uses in this area. The remainder of the Planning Area is defined by the new Apple Campus 2 development located on the east side of Wolfe Road. Vision The North Vallco Park area is envisioned to become a sustainable office and campus environment surrounded by a mix of connected, high-quality and pedestrian-oriented neighborhood center, hotels and residential uses. Taller heights may be allowed in the North Vallco Gateway per the Land Use and Community Design Element and addi- tional residential development may be allowed per the Housing Element. North Vallco Park includes a mix of uses, and will is envisioned to be transformed into a cohesive, pedestrian-scale neighborhood center 114 PA-12 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT North De Anza Context The North De Anza Special Area encompasses 150 acres and includes the portion of North De Anza Boulevard gen- erally between Interstate 280 and Stevens Creek Boulevard. De Anza Boulevard bisects the area in a north-south direc- tion. The area predominantly consists of office and campus uses with come commercial and hotel service uses. The street network in this area provides connections from the Garden Gate neighborhood to schools and services on the east side of De Anza Boulevard. Vision The North De Anza area is expected to remain a predomi- nantly office area. However, its designation as a Priority Development Area (PDA), and increase in foot traffic due to workers taking advantage of restaurants and services in the Heart of the City Planning Area, opens opportunities to locate higher density office uses along the corridor. This would include better connections to uses along Stevens Creek Boulevard in order to make the environment more pedestrian and bicycle-friendly. Streets in this area are envisioned to function as a walkable, bikeable grid that enhances connections for school children and residents from the Garden Gate neighborhood to Lawson Middle School and other services on the east side. North De Anza is expected to remain a core office area within Cupertino, home to several larger corporate campuses 115 PA-13 CHAPTER 2 Planning Areas REVISED PUBLIC DRAFT South De Anza Context The South De Anza Special Area encompasses the por- tion of South De Anza Boulevard between Stevens Creek Boulevard and Bollinger Road, and the western portion of South De Anza Boulevard between Highway 85 and Prospect Road. The South De Anza Boulevard Conceptual Plan establishes land uses, standards and guidelines for development and change of use for properties located within this Planning Area. Vision The South De Anza area will remain a predominantly general commercial area with supporting existing mixed residential uses. The policies in this area are intended to encourage lot consolidation (in order to resolve the frag- mented and narrow lot pattern), promote active retail and service uses, and improve bike and pedestrian connectivity to adjacent neighborhoods. For parcels that are not appro- priately located or configured to accommodate successful retail, commercial and commercial/office uses may be allowed in accordance with the City Municipal Code. South De Anza is expected to remain a smaller scale commercial district with some mixed residential 116 PA-14 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Homestead Context The Homestead Special Area is located in the northern por- tion of the city and includes residential, commercial, office and hotel uses along Homestead Road, between Interstate 280 and the Sunnyvale city limit. This major mixed-use corridor continues to be a predominantly mixed-use area with a series of neighborhood commercial centers and multi-family housing. The northern portion of this corridor is in Sunnyvale and is lined mostly with commercial and lower-intensity residential uses. Additional commercial uses include a hotel along De Anza Boulevard within the North De Anza Gateway. The Stelling Gateway, which consists primarily of commercial and residential uses, is also located in this area. Community facilities within the Homestead Planning Area include Franco Park and Homestead High School. The Apple Campus 2 project is located at the east- ern end of this corridor in the North Vallco Park Planning Area and is a major regional employment center. Vision The Homestead area will continue to be a predominantly mixed-use area with residential uses and a series of neigh- borhood centers providing services to local residents. Bike and pedestrian improvements in this area will provide bet- ter connections for residents and workers to access services. Tree-lined streets and sidewalks will provide an inviting environment and will link existing and new uses. The Homestead area includes a mix of low-rise to mid-rise residential, commercial, office and hotel uses that provide a transition between low density neighborhoods in Sunnyvale and more intense areas south of Interstate 280 117 PA-15 CHAPTER 2 Planning Areas REVISED PUBLIC DRAFT Bubb Road Context The Bubb Road Special Area is located south of Stevens Creek Boulevard between the Southern Pacific railroad tracks and Highway 85, on the north side of McClellan Road. This area is approximately 30 acres in size and consists primarily of low-rise industrial and research and development uses. The area is adjacent to Monta Vista Village to the west, Monta Vista North neighborhood to the south, and the mixed-use area of Monta Vista Village to the north. This area is one of the a few existing industrial areas in Cupertino. Vision The Bubb Road area is envisioned to become a tree-lined avenue that is more bike and pedestrian friendly. It will have an improved street grid necessary to accommodate increased foot traffic from local workers, and school children from the northern and eastern sections of Cupertino who travel to the tri-school area. Allowed uses in the Bubb Road Planning Area consist of those described in the ML-RC ordi- nance. In addition, neighborhood commercial and limited residential uses will continue to be allowed. Non-industrial uses in this area should be carefully reviewed to ensure that they do not impact the operations of existing industrial uses in this area. Development directly abutting low-intensity residential use should provide appropriate landscape buf- fers and setbacks. 118 PA-16 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Monta Vista Village Context The Monta Vista Village Special Area is an older neighbor- hood which served as an attractive farming and second home community since the late 1800s. It includes several important points of historic interest. Uses in this area consist of mixed neighborhood commercial, small commercial office, and multi-family and single-family residential uses. The area was incrementally annexed by the City starting in the 1960s, ending with complete annexation in 2004, from the unincorporated Santa Clara County. Roadway and utility infrastructure in a portion of this area needs upgrading and improvements. Monta Vista Village has a small town charac- ter and provides necessary services to the adjacent Monta Vista North and South neighborhoods. The streets within this area serve as a travel route for school children to the tri-school area in Monta Vista (Lincoln Elementary, Kennedy Middle and Monta Vista High Schools). Vision Monta Vista Village’s small town character as a pedestrian- oriented, small scaled, mixed-use residential, neighbor- hood commercial and industrial area will be retained and enhanced with new development and redevelopment. Improved pedestrian and bicycle access within the Area and to adjacent neighborhoods will promote the concept of complete, connected and walkable neighborhoods and improve travel routes to the tri-school area in Monta Vista. 119 PA-17 CHAPTER 2 Planning Areas REVISED PUBLIC DRAFT Other Non-Residential/Mixed-Use Areas Context In addition to the Special Areas described above, other Non-Residential/Mixed-Use Special Areas are located throughout Cupertino. These other Non-Residential/ Mixed-Use Special Areas include the following: west side of Stevens Canyon Road across from McClellan Road; intersec- tion of Foothill Boulevard and Stevens Creek Boulevard; Homestead Road near Foothill Boulevard; northwest corner of Bollinger Road and Blaney Avenue; and all other non- residential properties not referenced in an identified com- mercial area. Vision Neighborhood centers within other Non-Residential/Mixed- Use Areas should be redeveloped using the “neighborhood center” concept described in the Land Use and Community Design Element. Areas not designated as “neighborhood centers” are encouraged to provide commercial uses with a traditional storefront appearance. Second-level areas may be commercial office or residential. Residential uses, if allowed per the Housing Element, should be developed in the “mixed-use village” format as described later in the Land Use and Community Design Element. Buildings are typically one to two stories in height, but may be up to three stories in some instances where it is allowed. 120 PA-18 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT NEIGHBORHOODS Cupertino has a special community character which contrib- utes to its unique quality of life and sense of place enjoyed by people who live and work in the city. Neighborhoods play a vital role in supporting this great community quality of life. While Cupertino has grown and expanded over the years, neighborhoods have continued to serve as unique and identifiable areas that have great pride for local residents. In order to maintain the unique character and vitality of Cupertino’s neighborhoods, these areas must be served by needed community services such as schools, parks and neighborhood shopping. Connectivity within each neighborhood and to surrounding areas is also highly encouraged to promote social interaction and community engagement. Figure PA-2 highlights 12 identifiable neighborhoods within Cupertino. Each neighborhood is unique in its location, development pattern, identity and access to community services. Most of these areas are fully developed. However, as redevelopment opportunities arise, it is important that the policies outlined in the General Plan with respect to neighborhood preservation, connectivity, mobility and access to services are implemented. The following is a summary of the location, major characteristics, uses and vision for each of the city’s 12 neighborhoods. Each of the city’s 12 neighborhoods have a unique feel and character that needs to be protected in order to maintain Cupertino’s great quality of life 121 PA-19 CHAPTER 2 Planning Areas REVISED PUBLIC DRAFT FO O T H I L L B L V D ST E L L I N G R D De A N Z A B L V D HOMESTEAD ROAD WO L F E R D STEVENS CREEK BLVD BL A N E Y A V E MI L L E R A V E BOLLINGER RD McCLELLAN RD BU B B R O A D PROSPECT RD 85 280 TANTAU AVE Stevens Creek Reservoir Oak Valley Creston- Pharlap Homestead Villa Garden Gate Jollyman Monta Vista North Inspiration Heights North Blaney South Blaney Fairgrove Monta Vista South Rancho Rinconada Sunnyvale Santa Clara San Jose Los Altos 01000 0500 20003000 0 0.5 1Mile 1000 Feet Meters Neighborhoods Legend City Boundary Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas Oak Valley Creston-Pharlap Inspiration Heights Monta Vista North Monta Vista South Homestead Villa Garden Gate Jollyman North Blaney South Blaney Fairgrove Rancho Rinconada Figure PA-2 Neighborhoods 122 PA-20 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Oak Valley Context The Oak Valley neighborhood is located in the northwest- ern corner of Cupertino in a natural hillside transition with plentiful private and public open space. The neighborhood is bounded by Interstate 280, the City of Los Altos, Foothill Boulevard, Stevens Creek Boulevard and Santa Clara County open space/quarry uses. The Oak Valley develop- ment, located west of the railroad tracks, is predominantly defined by single-family residential homes developed in the late 1990s or early 2000s. Oak Valley is primarily accessed from Cristo Rey Drive west of Foothill Boulevard. Development has been directed away from steep slopes, view sheds, riparian corridors and areas of tree cover and architectural styles complement the natural setting. Other uses in the Oak Valley area include the PG&E Monta Vista Electrical Substation, The Forum senior living community and skilled nursing facility, Maryknoll Catholic Seminary (in Los Altos) and the Gate of Heaven Cemetery. Housing in this neighborhood includes detached single-family homes and senior independent and assisted living units. This area is served by several amenities including Santa Clara County’s Rancho San Antonio Park, Canyon Oak Park and Little Rancho Park. The areas south and east of the Union Pacific Railroad include low to medium density residential development, mostly in the form of clustered residential, and develop- ment designed with residential hillside standards to ensure that the impacts to are limited. The neighborhood has access to limited services within walking distance including a small neighborhood center at the intersection of Stevens Creek and Foothill Boulevards. The Oak Valley neighborhood is predominately a single family area, with great access to open space areas 123 PA-21 CHAPTER 2 Planning Areas REVISED PUBLIC DRAFT Vision The Oak Valley neighborhood will continue to be primarily a detached, single-family residential area. The area is fully developed, but there may be limited growth at The Forum and Gate of Heaven sites. No other land use changes are anticipated in this area. Development intensity in the detached single-family resi- dential portion is governed by a development agreement that includes a use permit and other approvals. These approvals describe development areas, intensity and styles of development, public park dedication, tree protec- tion, access and historic preservation. The theme of the approvals is to balance development with environmental protection by clustering development, setting it back from sensitive environmental areas and preserving large areas in permanent open space. Neighborhood connections and safe routes to Stevens Creek Elementary school on the east side of Foothill Boulevard will be enhanced with bike and pedestrian-friendly improvements along Foothill Boulevard and its key intersections. 124 PA-22 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Creston-Pharlap Context The Creston-Pharlap neighborhood is a single-family residential area that includes the last remaining unincor- porated pocket within the Cupertino urban service area. The Creston portion was subdivided in the mid 1950s but has remained unincorporated. The surrounding Pharlap portion was generally subdivided between the mid 1950s to mid/late 1960s. This neighborhood is developed with single-family homes, including the Creston area which has been pre-zoned with a single-family designation. The Creston-Pharlap neighborhood is served by Stevens Creek Elementary School, Varian Park and Somerset Park. Also included in this neighborhood is the Sunny View Retirement Community, which is a residential care facility for the elderly that provides skilled nursing and independent liv- ing. Stevens Creek meanders through the neighborhood in a general north-south direction. This neighborhood is separated from the Oak Valley neighborhood by Foothill Boulevard. The Homestead Crossings neighborhood center and the neighborhood center at the corner of Stevens Creek Boulevard and Foothill Boulevard are located a short distance away and provide neighborhood serving uses. 125 PA-23 CHAPTER 2 Planning Areas REVISED PUBLIC DRAFT Vision The Creston-Pharlap area is largely developed and is antici- pated to maintain its single-family character. The Creston por- tion will ultimately be annexed into the City of Cupertino with a single-family zoning designation to reflect the existing uses, consistent with the surrounding Pharlap portion. Potential trail connections within the Creston-Pharlap neighborhood may be considered to create trail linkages with the existing and planned trail system in the area. While this neighborhood does not include services within its boundary, the neighbor- hood commercial center at the intersection of Foothill and Stevens Creek Boulevards is within walking and biking distance to the southern part of the neighborhood. Bike and pedestrian-friendly improvements along Foothill Boulevard and its intersections will help enhance connections from the neighborhood to services on the west side. 126 PA-24 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Inspiration Heights Context The Inspiration Heights neighborhood is situated in the western foothills of Cupertino and offers uninterrupted vistas of the San Francisco Peninsula. The neighborhood is largely comprised of the undeveloped foothills along Cupertino’s western and southern edge and extends north to Stevens Creek Boulevard and east to Foothill Boulevard/ Stevens Canyon Road. Larger lot residential hillside homes are nestled along the foothills and accessed primarily via private drives. The Inspiration Heights foothills portion can be characterized as an environmentally sensitive area given the topography, vegetation, urban wildlife interface and proximity to two inferred earthquake faults. The lower ele- vation portions are more urbanized and consist of smaller lot and duplex developments closer to Stevens Creek and Foothill Boulevards, which provide a transition with the adjoining neighborhoods on the valley floor. Stevens Creek County Park and the Fremont Older space, operated by the Mid-Peninsula Open Space District, are located to the south and west of the neighborhood. The neighborhood is also served by Monta Vista Park, located along the west side of Foothill Boulevard, and two small neighborhood service centers (one at the intersection of Foothill Boulevard and Stevens Creek Boulevard and the other at the inter- section of Stevens Canyon Road and McClellan Road). Stevens Canyon Road is also a popular bicycle route for people accessing the open space preserves through this neighborhood. 127 PA-25 CHAPTER 2 Planning Areas REVISED PUBLIC DRAFT Vision The Inspiration Heights neighborhood will continue to be a low-intensity and hillside residential area. The lower elevation areas are largely developed; however, there remains some limited development potential in the foot- hills. Cupertino’s hillsides are an irreplaceable resource that provides important habitat for wildlife, recreational oppor- tunities for residents, and visual relief. Given the sensitive environmental conditions found in the hillsides, greater attention is needed in the review and consideration of any future development proposals within this neighborhood. Enhancing the bicycle and pedestrian environment along Foothill Boulevard and Stevens Canyon Road up to the southern edge of the city will help improve neighborhood connectivity to services as well as the environment for hikers and bikers who like to use the road to access open space areas to the south and west. 128 PA-26 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Monta Vista North Context The Monta Vista North neighborhood is located in the western portion of Cupertino and is generally bounded by Stevens Creek Boulevard to the north, Regnart Creek/Road to the south, Foothill Boulevard to the west and Highway 85 to the east. This neighborhood is directly adjacent to the Monta Vista Village Special Area. The Monta Vista North neighborhood encompasses the tri-school area of Lincoln Elementary School, Kennedy Middle School and Monta Vista High School, and also includes community facilities such as Blackberry Farm, McClellan Ranch Preserve, Linda Vista Park and Stevens Creek County Park. Located directly to the south of this neighborhood in the unincorporated county is the Fremont Older Open Space Preserve, oper- ated by the Midpeninsula Open Space District. Stevens Creek meanders through the western portion of the neighborhood through Blackberry Farm Golf Course and the privately owned and operated Deep Cliff Golf Course. Both golf courses are depressed in elevation in relation to the surrounding residential homes and are therefore subject to flooding. A number of Cupertino’s historic and commemorative sites are located in this neighborhood near Stevens Creek. A former quarry site is also located near the southwest portion of the neighborhood. Much of the neighborhood east of Stevens Creek is located along the valley floor; however, the topography in the southwestern portion of the neighborhood consists of steep slopes and hilly terrain. 129 PA-27 CHAPTER 2 Planning Areas REVISED PUBLIC DRAFT Vision The Monta Vista North neighborhood is largely built out with the exception of the former McDonald-Dorsa quarry site and an adjacent 42-acre property currently under the same ownership. A portion of this undeveloped land may be considered for limited future low-density residential development, which could include trails that would connect the City’s recreational facilities (McClellan Ranch Preserve and Linda Vista Park) to Stevens Creek County Park and the Fremont Older Open Space Preserve. 130 PA-28 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Monta Vista South Context The Monta Vista South neighborhood is located along the southern edge of Cupertino and is bounded by Regnart Road/Creek to the north, the City of Saratoga to the south across Prospect Road, the unincorporated County to the south and west, and Highway 85 and the City of San Jose to the east. The neighborhood can be divided into two general areas with very distinct characteristics. The west side of the Monta Vista South neighborhood is located in the southwestern foothills and zoned for residential hillside development. Lots in this area are primarily over one acre is size, in some instances up to 13 acres. The east side of the Monta Vista South neighborhood is located on the valley floor and is developed in a more traditional residential sub- division pattern with lots generally 6,000 square feet in size. Regnart Elementary School, Three Oaks Park and Hoover Park are located in the eastern portion of the Monta Vista South neighborhood. Also located at the southern edge of this neighborhood is the 37-acre Seven Springs Ranch that was listed on the California Register of Historic Places and determined eligible for the National Register in 2011. 131 PA-29 CHAPTER 2 Planning Areas REVISED PUBLIC DRAFT Vision The Monta Vista South neighborhood is envisioned to remain a residential area. There remains some limited subdivision potential within the residential hillsides, which would be subject to the City’s hillside policies and standards. In the eastern portion of the neighborhood, no change is anticipated with the exception of the Seven Springs area at the south edge of Cupertino that may have potential for limited development. Given the historic designation of the Seven Springs Ranch property, any future development would be subject to compliance with the Secretary of Interior’s Standards for Historic Resources. 132 PA-30 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Homestead Villa Context The Homestead Villa neighborhood is located at the northern edge of Cupertino at the northwest quadrant of Interstate 280 and Highway 85. The City of Los Altos is located to the west and north of this neighborhood, across Homestead Road. Housing within this neighbor- hood includes a mixture of traditional single-family homes, clustered homesites, townhomes, condominiums and duplexes. The area does not contain any public parks or schools; however, there is a private school located near the northeast corner of the neighborhood. The neighborhood is served by West Valley Elementary School and Cupertino Middle School across Homestead Road to the north, and Homestead High School to the east. The neighborhood is also served by the Homestead Crossing neighborhood center which currently includes coffee shops, a sandwich shop, personal service uses and a bank. Also located directly adjacent on the west, within the City of Los Altos, is a neighborhood shopping center that currently includes a pharmacy and specialty grocery store. 133 PA-31 CHAPTER 2 Planning Areas REVISED PUBLIC DRAFT Vision The Homestead Villa neighborhood is largely developed and is not anticipated to change in character. A trail along Foothill Boulevard is identified in the General Plan as a proposed trail linkage that will connect to Stevens Creek in Mountain View and points north. Bicycle and pedestrian improvements along Homestead Road will help the neigh- borhood connect to schools and services. 134 PA-32 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Garden Gate Context The Garden Gate neighborhood is located in the central portion of Cupertino and is predominantly defined by single-family residential homes with pockets of duplexes and apartments, including the Villages of Cupertino apart- ment site. Bounded by Interstate 280, Mary Avenue, the Heart of the City Special Area and the North De Anza Special Area, this area is served by several amenities includ- ing shopping and employment opportunities along Stevens Creek and De Anza Boulevards, Garden Gate Elementary, Mary Avenue Dog Park, Memorial Park and the Quinlan Community Center. A substantial portion of the neighbor- hood was originally developed in the early 1950s and was in unincorporated Santa Clara County until it was annexed to Cupertino in 2001. The remaining neighborhood near Mary Avenue was developed in the late 1960s. There has been substantial redevelopment of existing homes in the neighborhood since the 1990s with varying architectural styles and building sizes. Lot sizes are generally larger than other single-family residential neighborhoods in other parts of the city. 135 PA-33 CHAPTER 2 Planning Areas REVISED PUBLIC DRAFT Vision The Garden Gate neighborhood will continue to be mainly a residential area. Existing single-family residences will con- tinue to develop in accordance with the R1 Ordinance, and there may be redevelopment of some existing apartment and duplex uses. No other land use changes are anticipated in this area. Bicycle and pedestrian-friendly improvements to Stelling Road will help strengthen connections to Quinlan Center and Memorial Park. 136 PA-34 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Jollyman Context The Jollyman neighborhood is located in the central portion of Cupertino, south of Stevens Creek Boulevard. This area is predominantly defined by single-family residential homes and is generally located on the valley floor with minimal changes in grade. Bounded by Highway 85, Stevens Creek Boulevard and De Anza Boulevard, this area is served by several amenities including a large park and several churches along Stelling Road. McClellan Road is a major east-west corridor through the area. The McClellan Square Shopping Center, located in the South De Anza Special Area, includes grocery stores, pharmaceutical services and a variety of small restaurants and neighborhood serving uses. Housing types located in this neighborhood include fourplexes, townhomes and apartments. Jollyman Park and Faria Elementary School are also located in the Jollyman Neighborhood. 137 PA-35 CHAPTER 2 Planning Areas REVISED PUBLIC DRAFT Vision The Jollyman neighborhood will continue to be a residential area. It is anticipated that there may be limited residential growth in this area on sites that may be subdivided. No other changes are anticipated in this area. McClellan Road is a key school route and is envisioned to become a bicycle and pedestrian route to improve the east-west connection to connect neighborhoods to the east and west to the tri- school area. 138 PA-36 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT South Blaney Context The South Blaney neighborhood is located in the eastern portion of Cupertino, south of Stevens Creek Boulevard and east of De Anza Boulevard. This area is predominantly defined by single-family residential homes on the valley floor with minimal changes in grade. Bounded generally by Bollinger Road, Miller Road, De Anza Boulevard and Stevens Creek Boulevard, this area is served by several amenities including proximity to the Cupertino Library and two large parks: Wilson Park and Creekside Park. South Blaney Avenue is a major north-south corridor through the area. Two creeks run through this neighborhood. Regnart Creek has mainly a concrete channel and Calabazas Creek has a more natural channel. The De Anza Plaza Shopping Center, located in the South De Anza Special Area, includes a variety of small restaurants and neighborhood serving uses. Housing types located in this neighborhood include townhomes and duplexes that line Miller Avenue and Bollinger Road. Eaton Elementary School is also located in the South Blaney Neighborhood. 139 PA-37 CHAPTER 2 Planning Areas REVISED PUBLIC DRAFT Vision The South Blaney neighborhood will continue to be a residential area. It is anticipated that there may be limited residential growth in this area on sites that may be sub- divided or redeveloped with multi-family uses. No other changes are anticipated in this area. Enhancements to De Anza Boulevard, Blaney Avenue and Bollinger Road with a bicycle and pedestrian route will improve the north-south and east-west connections in this neighborhood. 140 PA-38 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT North Blaney Context The North Blaney neighborhood is located in the eastern portion of Cupertino, north of Stevens Creek Boulevard and east of De Anza Boulevard. This area is predominantly defined by single-family residential homes is on the val- ley floor with minimal grade changes. Bounded generally by De Anza Boulevard, Highway 280, Stevens Creek Boulevard, and Perimeter Road, this area is served by amenities including Portal Park, which includes a number of recreational amenities such as a tot lot and a recreation building. The Junipero Serra drainage channel runs along the northern edge of the neighborhood along Interstate 280. North Blaney is a major north-south corridor through the area. The Portal Plaza Shopping Center, located in the Heart of the City Special Area, includes grocery facilities and a variety of neighborhood serving uses. Proximity to the Vallco Shopping Mall in the Heart of the City Special Area provides opportunities for shopping for this neigh- borhood within close walking distance. Housing types located in this neighborhood include duplexes, townhomes and apartments closer to the freeway. The North Blaney Neighborhood includes Collins Elementary School and Lawson Middle School. 141 PA-39 CHAPTER 2 Planning Areas REVISED PUBLIC DRAFT Vision The North Blaney neighborhood will continue to be mainly a residential area. It is anticipated that there may be limited residential growth in this area on sites that may be subdivided or redeveloped. No other land use changes are anticipated in this area. Bicycle and pedestrian enhance- ments to North Blaney Avenue will improve the north-south connection through the city. There is also a potential to improve the east-west pedestrian and bicycle connection along the Junipero Serra channel along Interstate 280. 142 PA-40 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Rancho Rinconada Context The Rancho Rinconada neighborhood is located in the southeastern portion of Cupertino, bounded by Stevens Creek Boulevard, Tantau Avenue, Lawrence Expressway, Bollinger Road and the Fairgrove Neighborhood. This area is predominantly defined by single-family residential homes with some duplexes and apartments. The area is served by several amenities including shopping and employment opportunities along Stevens Creek Boulevard, Sterling Barnhart Park, Sedgwick Elementary School, Cupertino High School, Lutheran Church of Our Saviour, Bethel Lutheran Church and Saratoga Creek. The neighborhood was originally developed in the late 1940s/early 1950s and the majority of the neighborhood was in unincorporated Santa Clara County until it was annexed to Cupertino in 1999. There has been substantial redevelopment of existing homes in the neighborhood since the 1990s with varying architectural styles and building sizes. Lot sizes are generally smaller than other single-family residential neighborhoods in the city. This area is served by the newly constructed Sterling Barnhart Park at the eastern end of the neighborhood. In addition, the Rancho Rinconada Park and Recreation District operates a swim and recreation center at the southern end of the neighborhood, which are available to the residents of the Rancho Rinconada area. Neighborhood centers serving the area are along Stevens Creek Boulevard and Tantau Avenue to the north. 143 PA-41 CHAPTER 2 Planning Areas REVISED PUBLIC DRAFT Vision The Rancho Rinconada neighborhood will continue to be mainly a residential area. Existing single-family residences will continue to redevelop in accordance with the R1 Ordinance, and there may be redevelopment of some existing apartment and duplex uses. No other major land use changes are anticipated in this area. This area has the potential for a future park along the Saratoga/San Tomas Creek Trail west of Lawrence Expressway. 144 PA-42 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Fairgrove Context The Fairgrove neighborhood is located in the southeastern portion of Cupertino and includes the area bounded by Phil Lane to the north, Tantau Avenue to the east, Bollinger to the south, and Miller Avenue to the west. The neighbor- hood is zoned “R1e-Eichler Single Family” and consists of a group of distinct 220 Eichler homes built in the early 1960s. Hyde Middle School is located within the Fairgrove neighborhood. Vision The Fairgrove neighborhood will continue to be mainly a low density single-family residential area. The City will continue to encourage application of the Eichler Design Handbook Guidelines in the Fairgrove neighborhood to preserve the neighborhood’s unique character and architec- tural identity. The Fairgrove neighborhood has a very unique character, consisting of 2020 Eichler- designed homes 145 LAND USE AND COMMUNITY DESIGN ELEMENT Chapter 3 3 146 LU-2 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT LU-2 Housing Commission Attachment B 147 LU-3 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT CONTENTS LU-3 Introduction LU-4 Context Development History Land Use and Transportation Patterns Historic Preservation Hillsides Neighborhood Preservation Regional Land Use Planning Cupertino’s Demographics Climate Action Plan and Sustainable Development Principles Economic Vitality Citywide Growth and Community Benefits LU-11 Looking Forward LU-13 Citywide Goals and Policies Balanced Community Community Identity Streetscape Design Connectivity Historic Preservation Arts and Culture Economic Development and Fiscal Stability Regional Cooperation and Coordination Access to Community Facilities and Services Hillsides LU-45 Planning Areas Goals and Policies Special Areas Neighborhoods INTRODUCTION The Land Use and Community Design Element is the keystone of Community Vision 2040. It unifies and informs the other Elements by providing an overall policy context for future physical change. It deals with the issues of future growth and helps define the desired balance among social, environmental and economic considerations, while enhanc- ing quality of life in the community. As Cupertino implements Community Vision 2040, it aspires to preserve and enhance the distinct character of each planning area to create a vibrant community with invit- ing streets and public spaces, preserved, connected and walkable neighborhoods, exceptional parks and community services, and a vibrant economy with a strong tax base. This Element includes goals, policies and strategies that provide direction on land use and design principles that will shape future change in Cupertino. In turn, each of the other Elements in Community Vision 2040 support the land use and design assumptions included in this Element. 148 LU-4 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT CONTEXT Development History Cupertino was incorporated in 1955 and grew from a lightly settled agricultural community of 2,500 people into a mostly suburban community during Silicon Valley’s expansion from the 1960s through the 1980s. Cupertino’s attractive natural setting and close proximity to employment centers and regional transportation networks makes it a highly desirable place to live. Land Use and Transportation Patterns Cupertino’s land use pattern was largely built on a conven- tional suburban model, with predominantly single-family residential subdivisions and distinct commercial and employment centers. This development pattern was also heavily influenced by the topography of the area, with more intensive growth located on the valley floor and lower design residential on the foothills. The western area by the foothills is semi-rural with steep terrain, larger residential lots and access to open space. The pattern becomes more suburban immediately west of Highway 85 where residential neighborhoods have a more uniform pattern with smaller lots and older commercial and industrial areas along Stevens Creek Boulevard and Bubb Road. The land use pattern becomes more urban east of Highway 85, with a relatively connected street grid and commercial develop- ment along major boulevards such as Stevens Creek, De Anza, Homestead, Stelling and Wolfe. This area also has significant amounts of multi-family development in and around the major boulevards. The suburban pattern is also reflected in building locations, with most of the older buildings set back from the street with parking lots in the front. Streets have also been histori- cally widened to accommodate larger volumes of traffic, often to the detriment of other forms of transportation such as walking, biking and transit. In the last 20 years, the City 149 LU-5 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT has made strides towards improving walkability and bike- ability by retrofitting existing streets to include bike lanes; creating sidewalks lined with trees along major boulevards; and encouraging development to provide a more pedestri- an-oriented frontage with active uses, gathering places and entries lining the street. As the City seeks to implement sustainability and com- munity health objectives, future growth and retrofitting of existing infrastructure will create vibrant mixed-use, commercial, employment and neighborhood centers; pedestrian-oriented and walkable spaces for the community to gather; and distinct and connected neighborhoods with easy walkable and bikeable access to services, including schools, parks and shopping. Historic Preservation The Cupertino area was originally settled by the Ohlone Indians, who lived in the Rancho San Antonio area for over 3,000 years. In 1776 the area was explored by Spanish soldiers during an expedition let by Colonel Juan Batista De Anza. The area was later settled by European immi- grants who established farms on the valley’s fertile land and enjoyed a thriving agricultural economy. In the late nineteenth century, the village of Cupertino sprang up at the crossroads of Saratoga-Sunnyvale Road (De Anza Boulevard) and Stevens Creek Road. It was first known as the West Side. However, by 1898 the post office at the Crossroads needed a new name to distinguish it from other similarly named towns. The name “Cupertino” came from a local creek and winery owned by John T. Doyle, a San Francisco lawyer and historian. In 1904, the Cupertino name was officially applied to the Crossroads post office. At the same time, the Home Union Store at the Crossroads location was renamed the Cupertino Store and moved to the northeast corner of the Crossroads. 150 LU-6 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Many of Cupertino’s pioneer settlers planted vineyards and wineries proliferated on Montebello Ridge, on the lower foothills, and on the flat lands below. The valley, which flourished with orchards, became known as “Valley of the Heart’s Delight” and was visited by tourists who came by electric railway and later by rail car. In the late 1940s, Cupertino was swept up in Santa Clara Valley’s postwar population explosion. In 1954, Cupertino’s leaders began a drive for incorporation due to concerns related to unplanned development, higher taxes and piece- meal annexations by other cities. In 1955, the incorporation was approved by an election on September 27, 1955. Cupertino became Santa Clara County’s thirteenth City on October 10, 1955. Today, Cupertino is part of Silicon Valley, home to major world-renowned companies in the high technology sector. Hillsides Cupertino’s hillsides are an irreplaceable resource shared by the entire Santa Clara Valley. They provide important habi- tat for plants and wildlife; watershed capacity to prevent flooding in downstream areas; a wide vegetative belt that cleanses the air of pollutants; creates recreational opportu- nities for residents; and a natural environment that provides a contrast to the built environment. The City balances the needs of property owners in hillside areas with those of the environment and the community by allowing low-intensity residential and other uses in these areas, while requiring preservation of natural habitat and riparian corridors when selecting building sites. Neighborhood Preservation Cupertino is a city with diverse and unique neighborhoods that vary in character and composition. As Cupertino matures, the city must continue to look at preserving and 151 LU-7 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT enhancing its built environment. Cupertino’s vision is to preserve the distinct character of neighborhoods; provide walking and biking connections to services including parks, schools and shopping; and revitalize neighborhood centers as community gathering places. The City will welcome citizens as partners in making sure that their neighborhoods are the kind in which they want to live in the future. Regional Land Use Planning The Sustainable Communities and Climate Protection Act of 2008 (SB 375) calls on each of the State’s 18 metropolitan areas to develop a Sustainable Communities Strategy (SCS) to accommodate future population growth and reduce greenhouse gas emissions from cars and light trucks. Plan Bay Area, jointly adopted in 2013 by the Association of Bay Area Governments (ABAG) and the Metropolitan Transportation Commission (MTC), is the region’s first Sustainable Communities Strategy to meet the require- ments of SB 375 through the year 2040. Plan Bay Area anticipates that the Bay Area’s population will grow from about 7 million today to approximately 9 million by 2040 with employment growth of about 1.1 million jobs. The Plan provides a strategy for meeting 80 percent of the region’s future housing needs in Priority Development Areas (PDAs). These are neighborhoods within walking distance of frequent transit service, offering a wide variety of housing options, and featuring amenities such as grocery stores, community centers and restaurants. Cupertino’s Demographics Cupertino’s population has grown from 3,664 in 1960 to over 58,000 in 2010 per the U.S. Census Bureau. Most of the population growth has been from annexation of areas into the city and from tract development during the 1970s and 1980s. The city’s population is projected to grow to Priority Development Areas In 2008, ABAG and the MTC created a regional initiative to allow local governments to identify Priority Development Areas (PDAs). PDAs are areas where new development will support the day-to-day needs of residents and workers in a pedestrian-friendly environment served by transit. While PDAs were originally established to address housing needs in infill communities, they have been broadened to advance focused employment growth. PDAs are critical components for imple- menting the region’s proposed long term growth strategy. The level of growth in each PDA reflects its role in achieving regional objectives and how it fits into locally designated prior- ity growth plans. Cupertino’s PDA area includes properties within a quarter mile of Stevens Creek Boulevard from Highway 85 to its eastern border and a portion of North and South De Anza Boulevards. 152 LU-8 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT 66,110 by 2040 (Plan Bay Area, 2013). The diversity of its population has grown and changed over the years. In 1960, 94 percent of the population was white while only 6 percent of the population comprised of other races per the U.S. Census. This statistic held fairly steady until 1980 when the population of whites steadily started to decline with only 91 percent being white. By 1990, the population of whites had plunged to 74 percent and the Asian population had increased to 23 percent. In the following decade, the white population continued to decline steadily to 50 percent, while Asian population stood at 44 percent. By 2010 the Asian population in Cupertino accounted for almost two thirds of the population (63 percent). A sizeable portion of the City’s 2010 population, almost 50 percent are foreign born while only seven percent of the 1960 population was foreign born; indicating a large immigrant population. The population of Cupertino is also growing older. Per the 1970 census, the median age in the city was 26. The 2010 census reveals that the median age in Cupertino has increased to 39.9. In 1970, only three percent of the population was 65 years or over in age; however, the 2010 census indicates that 12.5 percent of the population is 65 years or over. With the changing demographic and ethnic values, hous- ing needs are changing as more immigrant families care for parents in their homes, younger workers look for more affordable housing, close to services and employment, and the older generation looks to downsize from their single- family homes into smaller, single-level homes within walking distance to shopping and entertainment. Climate Action Plan and Sustainable Development Principles A major challenge today is meeting the energy needs of a growing population while protecting the environment and natural resources. The Global Warming Solutions Act of 153 LU-9 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT 2006 (AB 32) and Executive Order S-3-05 set a target to reduce California’s greenhouse gas emissions to 1990 levels by year 2020 and by 80 percent below the 1990 levels by year 2050. The City is in the process of completing its Climate Action Plan (CAP), which aims to achieve statewide and Bay Area emissions reduction targets. The CAP is based on 2040 growth projections for Cupertino and identifies policies and strategies to reduce greenhouse gas emissions at a municipal and community-wide level. Similar to most neighboring cities, Cupertino has historically had an imbalance of land uses (housing, services and jobs) with a roadway infrastructure primarily dedicated to the automobile. When this imbalance is multiplied at a regional level, there are regional consequences including, traffic congestion, high housing costs, increased air pollution and lack of accessibility for the young, elderly and disabled. Economic Vitality Cupertino is fortunate in its location in the heart of Silicon Valley. Despite its mostly suburban characteristics to the west and south, the city is home to a number of small, medium and large software, technology and biomedical companies. Community Vision 2040 includes more office growth to support a strong fiscal revenues and a stable tax base. In particular, policies focus on retaining and increasing the number of small, medium and major businesses in key sectors and provide flexible space for innovative startups that need non-traditional office environment. Policies for commercial areas seek to revitalize the Vallco Shopping District, and enhance commercial centers and neighbor- hood centers, which contribute to the City’s tax base and serve community needs. 154 LU-10 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Citywide Growth and Community Benefits Cupertino’s Community Benefit Program provides the city with important community benefits, such as new parks and public gathering places, civic facilities, land or space for public agencies, senior housing, cultural facilities, and pub- lic realm and environmental enhancements. These benefits contribute to the quality of life and general livability of our city. In addition, funds (cash-in-lieu contributions) can be set aside for the future provision of community amenities and affordable and/or special needs housing. The Community Benefit Program enables the community to get amenities in return for allowing additional specified heights within key nodes and gateways along major cor- ridors. On the other hand, it also provides certainty to the community as to what those additional heights might be and where they can be placed. In doing so, the Program plays a key role in serving our growing community. As Cupertino’s resident and worker population increase, additional amenities will be necessary to maintain and improve the livability of the community. The Community Benefit Program is one of the key tools the City will use to help finance and achieve those amenities that maintain and increase our quality of life. Specifics about the Community Benefits Program elements are described later in this Element. 155 LU-11 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT LOOKING FORWARD Maintaining and enhancing Cupertino’s great quality of life is the keystone of Community Vision 2040. The City will look towards focusing future change within Special Areas that are located on Cupertino’s major mixed-use corridors. These areas already have a mix of commercial, office, hotel and residential uses, and are located along roadways that will be enhanced with “Complete Streets” features (see Mobility Element), improved landscaping and expanded public spaces (e.g., parks and plazas). In turn, the City will also protect and enhance Neighborhoods throughout Cupertino to ensure these largely residential areas continue to support the community’s great quality of life. As we look forward, the following are ways the City will address key challenges and opportunities facing Cupertino: 1. Planning for changing demographics. The City needs to plan not only for existing families which form a larger percentage of our population, but also for the growing demographic of seniors and younger workers through new housing, services, shopping, entertainment and community facilities. 2. Local and regional land use planning and collabo- ration. The City will take an active part in regional collaborative planning processes related to housing, transportation, sustainability, health, transportation and infrastructure financing in order to ensure local land use and transportation decisions are coordinated with regional efforts. 3. Integrating community health into land use planning. The City will enhance and improve health of people who live and work in our community. This includes integrating land use and transportation networks to reduce reliance on auto usage and improving alterna- tive choices for transportation by focusing growth and 156 LU-12 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT change in corridors that support all modes of transit, providing neighborhoods with easy access to schools, parks and neighborhood centers. 4. Land use and economics. The City will look to diversify the City’s tax base, support and retain existing busi- nesses, increase the vitality of aging commercial centers with redevelopment, seek to diversify shopping oppor- tunities so that the community has the opportunity to satisfy their shopping needs within Cupertino. 5. Urban design, form and character. The City will seek high-quality development to achieve desired physical environment in Planning Areas, including walkable, connected neighborhoods, inviting streets that allow for different modes of transportation, and vibrant and walkable special areas, and neighborhood centers in keeping with Community Vision 2040. 6. Preservation of natural environment and hillsides. Cupertino is blessed with an abundance of natural resources, including hillsides, creek corridors, and sensi- tive animal and plant habitats along the foothills. Much of this land is preserved in low-intensity residential and agricultural uses or open space. As redevelopment occurs, the City will strive to preserve these natural areas through land use and building design decisions. 7. Economic Vitality and Fiscal Stability. As Cupertino’s population grows and ages, demands on commu- nity resources will increase. In order to maintain and enhance the community’s quality of life, the City will ensure that existing businesses are encouraged to rein- vest and grow in Cupertino, and that the city continues to attract new businesses and investment. 157 LU-13 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT CITYWIDE GOALS AND POLICIES Balanced Community The City seeks to balance future growth and development in order create a more complete community. This includes ensuring a mix of land uses that support economic, social and cultural goals in order to preserve and enhance Cupertino’s great quality of life. Policy LU-1.1: Land Use and Transportation Focus higher land use intensities and densities within a half-mile of public transit service, and along major corridors. Policy LU-1.2: Development Allocation Maintain and update the development allocation table (Table LU-1) to ensure that the allocations for various land uses adequately meet city goals. Strategy LU-1.2.1: Planning Area Allocations. Development allocations are assigned for various Planning Areas. However, some flexibility may be allowed for transferring allocations among Planning Areas provided no significant environmental impacts are identified beyond those already studied in the Environmental Impact Report (EIR) for Community Vision 2040. GOAL LU-1 CREATE A BALANCED COMMUNITY WITH A MIX OF LAND USES THAT SUPPORTS THRIVING BUSINESSES, ALL MODES OF TRANSPORTATION, COMPLETE NEIGHBORHOODS AND A HEALTHY COMMUNITY 158 LU-14 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT TABLE LU-1 CITYWIDE DEVELOPMENT ALLOCATION BETWEEN 2014-2040 Commercial (s.f.)Offi ce (s.f.) Hotel (rooms)Residential (units) Current Built (Oct 7, 2014) BuildoutAvailableCurrent Built (Oct 7, 2014) BuildoutAvailableCurrent Built (Oct 7, 2014) BuildoutAvailableCurrent Built (Oct 7, 2014) BuildoutAvailable Heart of the City 1,522,9852,272,985 750,0002,263,1582,763,158500,0005528162641,336 2,8361,500 Vallco Shopping District 1,207,774600,000(607,774)-1,000,000-375375-600600 Homestead193,678 443,678 250,00069,55094,55025,0001264263006001,130530 N. De Anza51,37276,37225,0002,266,2062,466,206200,00012322310049219170 N. Vallco133,147233,147100,0003,069,6763,144,67675,000315615300554 1,379825 S. De Anza352,283477,283125,000130,708155,70825,000---6281275 Other143,132212,65869,526 564,331 669,331105,000---18,039 18,446407 Major Employers --- 109,935709,935600,000------ Monta Vista Village 93,914114,85920,945442,615466,441 23,826--- 828929101 Citywide3,698,2854,430,982 732,6978,916,1792,553,826 1,116 2,4551,33921,412 25,8204,408 1,000,000 11,470,005 159 LU-15 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Strategy LU-1.2.2: Major Employers. Reserve a develop- ment allocation for major companies with sales office and corporate headquarters in Cupertino. Prioritize expansion of office space for existing major companies. New office development must demonstrate that the development posi- tively contributes to the fiscal well-being of the city. Strategy LU-1.2.3: Unused Development Allocation. Unused development allocations may be re-assigned to the citywide allocation table per Planning Area, when develop- ment agreements and development permits expire. Strategy LU-1.2.4: Neighborhood Allocation. Allocate residential units in neighborhoods through the building per- mit process unless subdivision or development applications are required. Policy LU-1.3: Community Benefits Program At the discretion of the City Council, and as indicated in the Community Form Diagram (Figure LU-1), the City Council may approve additional heights over the base height stan- dard in gateways and nodes identified in the Special Areas map in the Planning Areas chapter (Figure PA-1). In order to obtain additional height, a developer may propose, and the City may agree upon, the following community benefits: 1. Ground floor retail component; and 2. One or more of the following benefits equivalent to at least 15 percent of the increase in value of the site attributed to the increase in height: a. Transportation and Mobility Improvements: i. New or expanded bicycle and pedestrian facilities. ii. Transit improvements and/or amenities including adaptive traffic signal management systems. TABLE LU-1 CITYWIDE DEVELOPMENT ALLOCATION BETWEEN 2014-2040 Commercial (s.f.)Office (s.f.) Hotel (rooms)Residential (units) Current Built (Oct 7, 2014) BuildoutAvailableCurrent Built (Oct 7, 2014) BuildoutAvailableCurrent Built (Oct 7, 2014) BuildoutAvailableCurrent Built (Oct 7, 2014) BuildoutAvailable Heart of the City1,522,9852,272,985 750,0002,263,1582,763,158500,0005528162641,336 2,8361,500 Vallco Shopping District 1,207,774600,000(607,774)-1,000,000-375375-600600 Homestead193,678 443,678 250,00069,55094,55025,0001264263006001,130530 N. De Anza51,37276,37225,0002,266,2062,466,206200,00012322310049219170 N. Vallco133,147233,147100,0003,069,6763,144,67675,000315615300554 1,379825 S. De Anza352,283477,283125,000130,708155,70825,000---6281275 Other143,132212,65869,526 564,331 669,331105,000---18,039 18,446407 Major Employers--- 109,935709,935600,000------ Monta Vista Village93,914114,85920,945442,615466,441 23,826--- 828929101 Citywide3,698,2854,430,982 732,6978,916,1792,553,826 1,116 2,4551,33921,412 25,8204,408 160 LU-16 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT iii. Participation in a community shuttle program (to provide connections to major employment and community nodes, including community facilities and shopping). b. Public Facilities: Provide land or space for public entities, such as the City or schools. c. Senior Housing: Provide at least 15 percent of housing for seniors, if the proposed project includes a residential component and is not already targeted towards seniors. d. Public Art and Cultural Facilities: i. Construction of a new, or expansion to, a community facility (e.g., recreation center, teen facility, etc.) ii. Construction of a new, or expansion of, a community gathering space (e.g., meeting/ conference space, cultural center or museum). e. Parks and Open Space: i. New publicly accessible park and/or open space within a project in excess of park dedication requirements. ii. Dedication of land for a new or expanded park outside the project boundary in excess of park dedication requirements. f. Cash-in-Lieu Contribution: A Cash-in-Lieu contribution is a contribution made to the City by a developer or applicant and is equivalent to at least 15 percent of the profit attributed to the increase in height achieved through the Community Benefits Program. The funds 161 LU-17 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT are allocated exclusively for purchase of land, capital improvements or operations related to items a, b, d, e, and towards the construction of affordable housing. All Cash-in-Lieu Contributions shall be made to the City. Strategy LU-1.3.1: Code Amendment. Update the Zoning Code and applicable Specific and Conceptual Plans to codify the provisions of the Community Benefit Program. Strategy LU-1.3.2: Retail Component. The retail com- ponent in the Community Benefit Program shall be the predominant use along the ground floor street frontage (for public or private streets), and shall be of sufficient depth and height to create a viable retail space(s). Strategy LU-1.3.3: Development Agreement. Offers of Community Benefit must be above and beyond project design elements and on-site or off-site contributions required as part of project environmental mitigations or Federal, State or local requirements as part of the standard entitlement process. The details and conditions of the Community Benefit will be achieved through the Community Benefits Program and will be formalized through a Development Agreement. Policy LU-1.4: Land Use in all Citywide Mixed-Use Districts Encourage land uses that support the activity and character of mixed-use districts and economic goals. Strategy LU-1.4.1: Commercial and Residential Uses. Review the placement of commercial and residential uses based on the following criteria: 1. All mixed-use areas with commercial zoning will require retail as a substantial component. The North De Anza Special Area is an exception. 162 LU-18 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Figure LU-1 Community Form Diagram 163 LU-19 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Mixed-Use Urban Villages Many of the City’s Housing Element sites are located in major corridors to reduce traffic and environmental impacts and preserve neighborhoods (Figure LU-1). Housing Element sites, which are further identified and defined in the Housing Element, represent the City’s priority for resi- dential development. Residential uses on sites with mixed-use zoning should be designed on the “mixed-use village” concept discussed in below. 1. Parcel assembly. Parcel assembly of the site is required. Further parcelization is highly dis- couraged in order to preserve the site for redevelopment in the future. 2. Plan for Complete Redevelopment. A plan for complete redevelopment of the site is required in order to ensure that the site can meet development standards and provide appro- priate buffers. 3. “Mixed-Use Village” layout. An internal street grid with streets and alleys using “transect planning” (appropriate street and building types for each area), that is pedestrian-oriented, connects to existing streets, and creates walkable urban blocks for buildings and open space. 4. Uses. Include a substantial viable, retail component. Retail and active uses such as restaurants, outdoor dining, and entries are required along the ground floor of main street frontages. Mix of units for young professionals, couples and/or active seniors who like to live in an active “mixed-use village” environment. Office uses, if allowed, should provide active uses on the ground floor street frontage, including restaurants, entries, lobbies, etc. 5. Open space. Open space in the form of a central town square with additional plazas and “greens” for community gathering spaces, public art, and community events. The locations and sizes will depend on the size of the site. 6. Architecture and urban design. Buildings should have high-quality, pedestrian-oriented archi- tecture, and an emphasis on aesthetics, human scale, and creating a sense of place. 7. Parking. Parking in surface lots shall be located to the side or rear of buildings. Underground parking under buildings is preferred. Above grade structures shall not be located along major street frontages. In cases, where above-grade structures are allowed along internal street frontages, they shall be lined with retail, entries and active uses on the ground floor. All park- ing structures should be designed to be architecturally compatible with a high-quality “town center” environment. 8. Neighborhood buffers. Setbacks, landscaping and/or building transitions to buffer abutting single-family residential areas. Neighborhood Centers serve adjacent neighborhoods and provide shopping and gathering places for residents. Retaining and enhancing neighborhood centers within and adjacent to neighborhoods throughout Cupertino supports the City’s goals for walkability, sustainability and 164 LU-20 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Neighborhood Commercial Centers Neighborhood Commercial Centers serve adjacent neighborhoods and provide shopping and gath- ering places for residents. Retaining and enhancing neighborhood centers within and adjacent to neighborhoods throughout Cupertino supports the City’s goals for walkability, sustainability and creat- ing gathering places for people. Figure LU-1 shows the location of the Neighborhood Commercial Centers in Cupertino. The Guiding Principles of sustainability and health in Community Vision 2040 support the retention and enhancement of neighborhood centers throughout the community, and providing pedestrian and bike connections to them from neighborhoods. Mixed-residential use may be considered if it promotes revitalization of retail uses, creation of new gathering spaces, and parcel assembly. Housing Element sites represent the City’s priority for residential development. Residential uses should be designed on the “mixed-use village” concept discussed in this Element. 165 LU-21 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT 2. All mixed-use residential projects should be designed on the “mixed-use village” concept discussed earlier in this Element. 3. On sites with a mixed-use residential designation, resi- dential is a permitted use only on Housing Element sites and in the Monta Vista Village Special Area. 4. Conditional use permits will be required on mixed-use Housing Element sites that propose units above the allocation in the Housing Element, and on non-Housing Element mixed-use sites. Strategy LU-1.4.2: Public and Quasi-Public Uses. Review the placement of public and quasi-public activities in lim- ited areas in mixed-use commercial and office zones when the following criteria are met: 1. The proposed use is generally in keeping with the goals for the Planning Area, has similar patterns of traffic, population or circulation of uses with the area and does not disrupt the operations of existing uses. 2. The building form is similar to buildings in the area (commercial or office forms). In commercial areas, the building should maintain a commercial interface by providing retail activity, storefront appearance or other design considerations in keeping with the goals of the Planning Area. Policy LU-1.5: Parcel Assembly Encourage parcel assembly and discourage parcelization to ensure that infill development meets City standards and provides adequate buffers to neighborhoods. Policy LU-1.6: Community Health through Land Use Promote community health through land use and design. 166 LU-22 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Community Identity The City will seek to promote community identity and design consistency through the development review pro- cess and infrastructure master plans. Policy LU-2.1: Gateways Implement a gateway plan for the city’s entry points (Figure LU-2) and identify locations and design guidelines for gate- way features. Look for opportunities to reflect the gateway concept when properties adjacent to defined gateways are redeveloped. Policy LU-2.2: Pedestrian-Oriented Public Spaces Require developments to incorporate pedestrian-scaled elements along the street and within the development such as parks, plazas, active uses along the street, active uses, entries, outdoor dining and public art. GOAL LU-2 ENSURE THAT BUILDINGS, SIDEWALKS, STREETS AND PUBLIC SPACES ARE COORDINATED TO ENHANCE COMMUNITY IDENTITY AND CHARACTER FO O T H I L L B L V D ST E LL I NG RD De AN ZA BL VD HOMESTEAD ROAD WO LF E RD PRUNERIDGE AVE STEVENS CREEK BLVD BL AN EY AV E M I L L E R AV E BOLLINGER RD McCLELLAN ROAD RAINBOW DRIVE BU B B RO AD PROSPECTROAD 85 280 TANTAU AVE Figure LU-2: Gateways 167 LU-23 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Site and Building Design The City will seek to ensure that the site and building design of new projects enhance the public realm (e.g., streets, parks, plazas and open space areas) and that there is a focus on integrating connections to adjacent neighbor- hoods, where appropriate. Policy LU-3.1: Site Planning Ensure that project sites are planned appropriately to cre- ate a network of connected internal streets that improve pedestrian and bicycle access, provide public open space and building layouts that support city goals related to streetscape character for various Planning Areas and corridors. Policy LU-3.2: Building Heights and Setback Ratios Maximum heights and setback ratios are specified in Figure LU-1. As indicated in the figure, taller heights are focused on major corridors, gateways and nodes. Setback ratios are established to ensure that the desired relationship of build- ings to the street is achieved. Where additional heights above the base height are allowed, the Community Benefits Program provides direction on requirements and the pro- cess of how additional height may be allocated. GOAL LU-3 ENSURE THAT PROJECT SITE PLANNING AND BUILDING DESIGN ENHANCE THE PUBLIC REALM AND INTEGRATE WITH ADJACENT NEIGHBORHOODS 168 LU-24 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Policy LU-3.3: Building Design Ensure that building layouts and design are compatible with the surrounding environment and enhance the streetscape and pedestrian activity. Strategy LU-3.3.1: Attractive Design. Emphasize attrac- tive building and site design by paying careful attention to building scale, mass, placement, architecture, materials, landscaping, screening of equipment, loading areas, sig- nage and other design considerations. Strategy LU-3.3.2: Mass and Scale. Ensure that the scale and interrelationships of new and old development comple- ment each other. Buildings should be grouped to create a feeling of spatial unity. Strategy LU-3.3.3: Transitions. Buildings should be designed to avoid abrupt transitions with existing devel- opment, whether they are adjacent or across the street. Consider reduced heights, buffers and/or landscaping to transition to residential and/or low-intensity uses in order to reduce visual and privacy impacts. Strategy LU-3.3.4: Compatibility. Ensure that the floor area ratios of multi-family residential developments are compatible with buildings in the surrounding area. Include a mix of unit types and avoid excessively large units. Strategy LU-3.3.5: Building Location. Encourage build- ing location and entries closer to the street while meeting appropriate landscaping and setback requirements. Strategy LU-3.3.6: Architecture and Articulation. Promote high-quality architecture, appropriate building articulation and use of special materials and architectural detailing to enhance visual interest. Strategy LU-3.3.7: Street Interface. Ensure development enhances pedestrian activity by providing active uses along 169 LU-25 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT a majority of the building frontage facing the street. Mixed- use development should include retail, restaurant, outdoor dining, main entries, etc. Residential development should include main entrances, lobbies, front stoops and porches, open space and other similar features. Strategy LU-3.3.8: Drive-up Services. Allow drive-up service facilities only when adequate circulation, parking, noise control, architectural features and landscaping are compatible with the expectations of the Planning Area, and when residential areas are visually buffered. Prohibit drive- up services in areas where pedestrian-oriented activity and design are highly encouraged, such as Heart of the City, North De Anza Boulevard, Monta Vista Village and neigh- borhood centers. Strategy LU-3.3.9: Specific and Conceptual Plans. Maintain and update Specific/Conceptual plans and design guidelines for Special Areas such as Heart of the City, Crossroads, Homestead Corridor, Vallco Shopping District, North and South De Anza corridors and Monta Vista Village. Strategy LU-3.3.10: Entrances. In multi-family projects where residential uses may front on streets, require pedes- trian-scaled elements such as entries, stoops and porches along the street. Policy LU-3.4: Parking In surface lots, parking arrangements should be based on the successful operation of buildings; however, parking to the side or rear of buildings is desirable. No visible garages shall be permitted along the street frontage. Above grade structures shall not be located along street frontages and shall be lined with active uses on the ground floor on inter- nal street frontages. Subsurface/deck parking is allowed provided it is adequately screened from the street and/or adjacent residential development. 170 LU-26 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Streetscape Design The City will seek to improve streetscapes throughout Cupertino with attractive landscaping, and complete and safe sidewalks. Policy LU-4.1: Street and Sidewalks Ensure that the design of streets, sidewalks and pedestrian and bicycle amenities are consistent with the vision for each Planning Area and Complete Streets policies. Policy LU-4.2: Street Trees and Landscaping Ensure that tree planting and landscaping along streets visually enhances the streetscape and is consistent for the vision for each Planning Area (Special Areas and Neighborhoods): 1. Maximize street tree planting along arterial street front- ages between buildings and/or parking lots. 2. Provide enhanced landscaping at the corners of all arte- rial intersections. 3. Enhance major arterials and connectors with landscaped medians to enhance their visual character and serve as traffic calming devices. 4. Develop uniform tree planting plans for arterials, con- nectors and neighborhood streets consistent with the vision for the Planning Area. GOAL LU-4 PROMOTE THE UNIQUE CHARACTER OF PLANNING AREAS AND THE GOALS FOR COMMUNITY CHARACTER, CONNECTIVITY AND COMPLETE STREETS IN STREETSCAPE DESIGN 171 LU-27 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT 5. Landscape urban areas with formal planting arrangements. 6. Provide a transition to rural and semi-rural areas in the city, generally west of Highway 85, with informal planting. Connectivity The City will ensure that employment centers and neighbor- hoods have access to desired and convenient amenities, such as local retail and services. Policy LU-5.1: Neighborhood Centers Retain and enhance local neighborhood shopping centers and improve pedestrian and bicycle access to neighbor- hoods to improve access to goods and services. Policy LU-5.2: Mixed-Use Villages Where housing is allowed along major corridors or neigh- borhood commercial areas, development should promote mixed-use villages with active ground-floor uses and public space. The development should help create an inviting pedestrian environment and activity center that can serve adjoining neighborhoods and businesses. GOAL LU-5 ENSURE THAT EMPLOYMENT CENTERS AND NEIGHBORHOODS HAVE ACCESS TO LOCAL RETAIL AND SERVICES WITHIN WALKING OR BICYCLING DISTANCE 172 LU-28 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Policy LU-5.3: Enhance Connections Look for opportunities to enhance publicly-accessible pedestrian and bicycle connections with new development or redevelopment. Historic Preservation Cupertino has a rich and varied cultural history; however, only a few historic buildings and resources are preserved today. The City seeks to encourage preservation of these precious historic resources and encourage their enhance- ment in the future. Policy LU-6.1: Historic Preservation Maintain and update an inventory of historically significant structures and sites in order to protect resources and promote awareness of the city’s history in the following four categories: Historic Sites, Commemorative Sites, Community Landmarks and Historic Mention Sites (Figure LU-5). Policy LU-6.2: Historic Sites Projects on Historic Sites shall meet the Secretary of Interior Standards for Treatment of Historic Properties. GOAL LU-6 PRESERVE AND PROTECT THE CITY’S HISTORIC AND CULTURAL RESOURCES 173 LU-29 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT FO O T H I L L B L V D ST E L L I N G R D De A N Z A B L V D HOMESTEAD ROAD WO L F E R D STEVENS CREEK BLVD BL A N E Y A V E MI L L E R A V E BOLLINGER RD McCLELLAN ROAD RAINBOW DRIVE BU B B R O A D PROSPECT ROAD 85 280 TANTAU AVE Stevens Creek Reservoir Hanson Permanente Monta Vista Neighborhood Cupertino Historical Museum Memorial Park, Community Center, Sports Complex De Anza College De Anza Industrial Park Cupertino Civic Center Vallco Shopping District Vallco Industrial Park A B C D E F G H I Sunnyvale Santa Clara San Jose Saratoga Los Altos Maryknoll Seminary Snyder Hammond House De La Vega Tack House Baer Blacksmith Enoch J. Parrish Tank House Nathan Hall Tank House Gazebo Trim Union Church of Cupertino Old Collins School Miller House Glendenning Barn McClellan Ranch Barn Seven Springs Ranch 1 2 3 4 5 6 7 8 9 10 11 1 2 3 4 5 6 7 8 9 10 11 12 12 12 13 13 De Anza Knoll Doyle Winery “Cupertino Wine Company” Stocklmeir Farmhouse Elisha Stephens Place Arroyo De San Joseph Cupertino Hazel Goldstone Variety Store Woelffel Cannery Engles Grocery “Paul and Eddie’s” Apple One Building Baldwin Winery Le Petit Trianon and Guest Cottages Interim City Hall City of Cupertino Crossroads St. Joseph’s Church 1 7 8 53 A I D H C E F B 9 10 11 2 4 G ~11/2 Mile West 6 2 1 3 4 8 12 7 14 2 10 1 114 5 133 9 6 01000 0500 20003000 0 0.5 1Mile 1000 Feet Meters Legend City Boundary Heart of the City Boundary Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas Historic Sites Commemorative Sites 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Community Landmarks Montebello School, 1892 Perrone Ranch Stone Cellar, now part of Ridge Vineyards Picchetti Brothers Winery and Ranch Woodhills Estate 1 2 3 4 Sites of Historic Mention (outside city jurisdicition) Figure LU-5 Historic Resources 174 LU-30 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Policy LU-6.3: Historic Sites, Commemorative Sites and Community Landmarks Projects on Historic Sites, Commemorative Sites and Community Landmarks shall provide a plaque, reader board and/or other educational tools on the site to explain the historic significance of the resource. The plaque shall include the city seal, name of resource, date it was built, a written description and photograph. The plaque shall be placed in a location where the public can view the information. Policy LU-6.4: Public Access Coordinate with property owners of public and quasi-public sites to allow public access of Historic and Commemorative Sites to foster public awareness and education. Private property owners will be highly encouraged, but not required, to provide public access to Historic and Commemorative Sites. Policy LU-6.5: Historic Mention Sites These are sites outside the City’s jurisdiction that have contributed to the City’s history. Work with agencies that have jurisdiction over the historical resource to encourage adaptive reuse and rehabilitation and provide public access and plaques to foster public awareness and education. Policy LU-6.6: Incentives for Preservation of Historic Resources Utilize a variety of techniques to serve as incentives to fos- ter the preservation and rehabilitation of Historic Resources including: 1. Allow flexible interpretation of the zoning ordinance not essential to public health and safety. This could 175 LU-31 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT include land use, parking requirements and/or setback requirements. 2. Use the California Historical Building Codes standards for rehabilitation of historic structures. 3. Tax rebates (Milles Act or Local tax rebates). 4. Financial incentives such as grants/loans to assist reha- bilitation efforts. Policy LU-6.7: Heritage Trees Protect and maintain the city’s heritage trees in a healthy state. Strategy LU-6.7.1: Heritage Tree List. Establish and periodically revise a heritage tree list that includes trees of importance to the community. Policy LU-6.8: Cultural Resources Promote education related to the city’s history through public art in public and private developments. 176 LU-32 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Snyder Hammond House 22961 Stevens Creek Blvd. Old Collins School 20441 Homestead Road - Cupertino De Oro Club Maryknoll Seminary 2300 Cristo Rey Drive Glendenning Barn 10955 N Tantau Avenue – Hewlett Packard Baer Blacksmith 22221 McClellan Road – McClellan Ranch Park Gazebo Trim Mary & Stevens Creek Blvd. – Memorial Park Nathan Hall Tank House 22100 Stevens Creek Blvd. Enoch J. Parrish Tank House 22221 McClellan Road – McClellan Ranch Park De La Vega Tack House Rancho Deep Cliff Club House Union Church of Cupertino 20900 Stevens Creek Boulevard Miller House 10518 Phil Place Historic Sites McClellan Ranch Barn 22221 McClellan Rd Seven Springs Ranch 11801 Dorothy Anne Way 177 LU-33 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Commemorative Sites Elisha Stephens Place 22100 Stevens Creek Boulevard – Existing Plaque Doyle Winery “Cupertino Wine Company” Visible from McClellan Ranch Park (no photo available) De Anza Knoll Off of Cristo Rey Drive Le Petit Trianon and Guest Cottages 1250 Stevens Creek Boulevard – Foothill-De Anza Community College, Listed on the National Register of Historic Places Stocklmeir Farm House 22120 Stevens Creek Road Woelffel Cannery 10120 Imperial Avenue – Demolished St. Josephs Church 10110 North de Anza Boulevard Apple One Building 10240 Bubb Road Arroyo De San Joseph Cupertino 21840 McClellan Road – Monta Vista High School, State of California Historical Landmark #800 The Crossroads Intersection at Stevens Creek Boulevard and De Anza Boulevard Interim City Hall 10321 South De Anza Boulevard 178 LU-34 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Baldwin Winery 1250 Stevens Creek Boulevard – Foothill-De Anza Community College Engles Grocery “Paul and Eddie’s” 1619 Stevens Creek Boulevard Hazel Goldstone Variety Store 21700 Stevens Creek Boulevard Perrone Ranch Stone Cellar: Ridge Vineyards 17100 Montebello Road – Mid-Peninsula Regional Open Space District Woodhills Estate Cupertino/Saratoga Hills, End of Prospect Road – Mid-Peninsula Regional Open Space District, National Register of Historic Places Picchetti Brothers Winery 13100 Montebello Road – Mid-Peninsula Regional Open Space District Montebello School 15101 Montebello Road Sites of Historic Mention Commemorative Sites (continued) 179 LU-35 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Arts and Culture Cupertino history and diversity provides a rich background for community art and culture. The City seeks to encour- age support public art and the arts community through development. Policy LU-7.1: Public Art Stimulate opportunities for the arts through develop- ment and cooperation with agencies and the business community. Strategy LU-7.1.1: Public Art Ordinance Maintain and update an ordinance requiring public art in public as well as private projects of a certain size. Strategy LU-7.1.2: Gateways. Promote placement of vis- ible artwork in gateways to the city. Strategy LU-7.1.3: Artist Workspace. Encourage the development of artist workspace, such as live/work units, in appropriate location in the city. Note: see the Recreation and Community Services Element for policies related to programming. GOAL LU-7 PROMOTE A CIVIC ENVIRONMENT WHERE THE ARTS EXPRESS AN INNOVATIVE SPIRIT, CULTURAL DIVERSITY AND INSPIRE COMMUNITY PARTICIPATION 180 LU-36 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Economic Development and Fiscal Stability The City will seek to identify strategies and programs that support and retain local businesses, attract new businesses and investment, and ensure the long-term fiscal health of the City. Policy LU-8.1: Fiscal Health Maintain and improve the City’s long-term fiscal health. Policy LU-8.2: Land Use Encourage land uses that generate City revenue. Strategy LU-8.2.1: Fiscal Impacts. Evaluate fiscal impacts of converting office/commercial uses residential use, while ensuring that the city meets regional housing requirements. Policy LU-8.3: Incentives for Reinvestment Provide incentives for reinvestment in existing, older com- mercial areas. Strategy LU-8.3.1: Mixed-use. Consider mixed-use (office, commercial, residential) in certain commercial areas to encourage reinvestment and revitalization of sales-tax producing uses, when reviewing sites for regional housing requirements. Strategy LU-8.3.2: Shared or Reduced Parking. Consider shared or reduced parking, where appropriate as incentives to construct new commercial and mixed-use development, GOAL LU-8 MAINTAIN A FISCALLY SUSTAINABLE CITY GOVERNMENT THAT PRESERVES AND ENHANCES THE QUALITY OF LIFE FOR ITS RESIDENTS, WORKERS AND VISITORS 181 LU-37 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT while increasing opportunities for other modes of transportation. Strategy LU-8.3.3: Infrastructure and Streetscape Improvements. Consider infrastructure and streetscape improvements in areas, such as the Crossroads or South Vallco area to encourage redevelopment as a pedestrian- oriented area that meets community design goals. Strategy LU-8.3.4: High Sales-Tax Producing Retail Uses. Consider locations for high sales-tax producing retail uses (such as life-style and hybrid commodity-specialty centers) provided the development is compatible with the surround- ing area in terms of building scale and traffic. Policy LU-8.4: Property Acquisition Maximize revenue from City-owned land and resources, and ensure that the City’s land acquisition strategy is balanced with revenues. Policy LU-8.5: Efficient Operations Plan land use and design projects to allow the City to main- tain efficient operations in the delivery of services including, community centers, parks, roads, and storm drainage, and other infrastructure. 182 LU-38 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Policy LU-9.1: Cooperation with Business Establish and maintain a cooperative relationship with the business community to support innovation and take advan- tage of economic development opportunities. Strategy LU-9.1.1: Economic Development Strategy Plan. Create and periodically update an Economic Development Strategy Plan in order to ensure the City’s long-term fiscal health and stability and to make Cupertino an attractive place to live, work and play. Strategy LU-9.1.2: Partnerships. Create partnerships between the City and other public and private organiza- tions to promote the development of innovative technology and businesses in the community and facilitate growth and infrastructure improvements that benefits residents and businesses. Strategy LU-9.1.3: Economic Development and Business Retention. Encourage new businesses and retain existing businesses that provide local shopping and services, add to municipal revenues, contribute to economic vitality and enhance the City’s physical environment. Strategy LU-9.1.4: Regulations. Periodically review and update land use and zoning requirements for retail, com- mercial and office development in order to attract high- quality sales-tax producing businesses and services, while adapting to the fast-changing retail, commercial and office environment. GOAL LU-9 PROMOTE A STRONG LOCAL ECONOMY THAT ATTRACTS AND RETAINS A VARIETY OF BUSINESSES 183 LU-39 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Strategy LU-9.1.5: Incubator Work Space. Encourage the development of flexible and affordable incubator work space for start-ups and new and emerging technologies. Strategy LU-9.1.6: Development Review. Provide efficient and timely review of development proposals, while main- taining quality standards in accordance with city codes. Look for a solution-based approach to problems while being responsive to community concerns and promote positive communication among parties. Policy LU-9.2: Work Environment Encourage the design of projects to take into account the well-being and health of employees and the fast-changing work environment. Strategy LU-9.2.1: Local Amenities. Encourage office development to locate in areas where workers can walk or bike to services such as shopping and restaurants, and to provide walking and bicycling connections to services. Strategy LU-9.2.2: Workplace Policies. Encourage public and private employers to provide workplace policies that enhance and improve the health and well-being of their employees. 184 LU-40 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Regional Cooperation and Coordination The City will work with regional agencies to coordinate with regional plans and address community priorities by partici- pating in the planning process. Policy LU-10.1: Regional Decisions Coordinate with regional and local agencies on planning, transportation, economic development and sustainability issues to ensure that the decisions improve fiscal health and the quality of life for Cupertino residents and businesses. Policy LU-10.2: Regional Planning Coordination Review regional planning documents prior to making deci- sions at the local level. Policy LU-10.3: Neighboring Jurisdictions Collaborate with neighboring jurisdictions on issues of mutual interest. Policy LU-10.4: Urban Service Area Work with neighboring jurisdictions to create boundaries that are defined by logical municipal service areas. Strategy LU-10.4.1: Tax-sharing agreements. Consider entering into tax-sharing agreements with adjacent jurisdic- tions in order to facilitate desired boundary realignments. GOAL LU-10 PROMOTE EFFECTIVE COORDINATION WITH REGIONAL AND LOCAL AGENCIES ON PLANNING ISSUES 185 LU-41 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Policy LU-10.5: Annexation Actively pursue the annexation of unincorporated proper- ties within the City’s urban service area, including the Creston neighborhoods, which will be annexed on a parcel- by-parcel basis with new development. Other remaining unincorporated islands will be annexed as determined by the City Council. Access to Community Facilities and Services The City will seek to improve connectivity and access to public facilities and services, including De Anza College. Policy LU-11.1: Connectivity Create pedestrian and bicycle access between new developments and community facilities. Review existing neighborhood circulation to improve safety and access for students to walk and bike to schools, parks, and community facilities such as the library. Policy LU-11.2: De Anza College Allow land uses not traditionally considered part of a col- lege to be built at De Anza College, provided such uses integrate the campus into the community, provide facilities and services not offered in the City and/or alleviate impacts created by the college. GOAL LU-11 MAINTAIN AND ENHANCE COMMUNITY ACCESS TO LIBRARY AND SCHOOL SERVICES PROVIDED BY OTHER AGENCIES 186 LU-42 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Hillsides The City seeks to establish clear hillside policy in order to provide for the realistic use of privately-owned hillside lands, while preserving natural and aesthetic features. Policy LU-12.1: Land Use Regulations Establish and maintain building and development standards for hillsides that ensure hillside protection. Strategy LU-12.1.1: Ordinance and development review. Through building regulations and development review, limit development on ridgelines, hazardous geological areas and steep slopes. Control colors and materials and minimize the illumination of outdoor lighting. Reduce visible building mass with measures including, stepping structures down the hillside, following natural contours, and limiting the height and mass of the wall plane facing the valley floor. Strategy LU-12.1.2: Slope-density formula. Apply a slope- density formula to very low intensity residential develop- ment in the hillsides. Density shall be calculated based on the foothill modified, foothill modified ½ acre and the 5-20 acre slope density formula. Actual lot sizes and develop- ment areas will be determined through zoning ordinances, clustering and identification of significant natural features and geological constraints. Strategy LU-12.1.3: 1976 General Plan-Previously des- ignated Very Low Density: Semi-Rural 5-acre. Properties previously designated Very Low-Density Residential: Semi- Rural 5-acre per the 1976 General Plan may be subdivided GOAL LU-12 PRESERVE AND PROTECT THE CITY’S HILLSIDE NATURAL HABITAT AND AESTHETIC VALUES 187 LU-43 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT utilizing that formula. Properties that have already been since subdivided in conformance with the above designa- tion have no further subdivision potential for residential purposes. Strategy LU-12.1.4: Existing lots in Foothill Modified and Foothill Modified 1/2–acre Slope density designations. Require discretionary review with a hillside exception for hillside or R1 properties if development is proposed on substandard parcels on slopes per the R1 and RHS zoning. Policy LU-12.2: Clustering Subdivisions Cluster lots in major subdivisions and encourage clustering in minor subdivisions, for projects in the 5-20-acre slope density designation. Reserve 90 percent of the land in private open space to protect the unique characteristics of the hillsides from adverse environmental impacts. Keep the open space areas contiguous as much as possible. Policy LU-12.3: Rural Improvement Standards in Hillside Areas Require rural improvement standards in hillside areas to preserve the rural character of the hillsides. Improvement standards should balance the need to furnish adequate util- ity and emergency services against the Strategy LU-12.3.1: Grading. Follow natural land contours and avoid mass of grading of sites during construction, especially in flood hazard or geologically sensitive areas. Grading hillside sites into large, flat areas shall be avoided. Strategy LU-12.3.2: Roads. Roads should be narrowed to avoid harming trees and streambeds. Strategy LU-12.3.3: Trees. Retain significant specimen trees, especially when they grow in groves or clusters and integrate them into the developed site. 188 LU-44 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Policy LU-12.4: Hillside Views The Montebello foothills at the south and west boundary of the valley floor provide a scenic backdrop, adding to the City’s scale and variety. While it is not possible to guarantee an unobstructed view of the hills from every vantage point, an attempt should be made to allow views of the foothills from public gathering places. Strategy LU-12.4.1: Views from Public Facilities. Design public facilities, particularly open spaces, so they include views of the foothills or other nearby natural features, and plan hillside developments to minimize visual and other impacts on adjacent public open space. Strategy LU-12.4.2: Developments near Public Space. Located private driveways and building sites as far as pos- sible from property boundaries adjoining public open space preserves and parks to enhance the natural open space character and protect plant and animal habitat. Policy LU-12.5: Development in the County Jurisdiction Development in the County, particularly if located near Cupertino’s hillsides and urban fringe area, should consider the goals and policies in Community Vision 2040. Strategy LU-12.5.1: County Development. Development in these areas should be compatible with Cupertino’s hillside policies of low-intensity residential, agricultural or open space uses. Preservation of the natural environment, clustering sites to minimize impact and dedication of open space are encouraged. Visual impacts, access, traffic and other impacts, and service demands should be assessed in consultation with Cupertino’s goals and policies. 189 LU-45 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT PLANNING AREA GOALS AND POLICIES As outlined in the Planning Areas chapter, Community Vision 2040 organizes the city into 21 distinct Planning Areas, divided into two categories: (1) Special Areas that are expected to transition over the life of the General Plan and (2) Neighborhoods where future changes are expected to be minimal. The following goals, policies and strategies are specific to the Planning Areas and provide guidance for future change in accordance with the community vision. Figure LU-1 shows maximum heights and residential densi- ties allowed in each Special Area. The City Council may grant height increases above the maximum base height standard in certain areas if a project includes community benefits 190 LU-46 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Special Areas Special Areas are located along major mixed-use corridors and nodes that have access to a variety of different forms of transportation. Future growth in Cupertino will be focused in these areas to manage growth while minimizing traffic, greenhouse gas and health impacts on the com- munity. The discussion for each Special Area outlines goals, policies and strategies related to land use, building form, streetscape, connectivity, open space, landscaping, and the urban/rural ecosystem in order to help implement the com- munity vision for these areas. 191 LU-47 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Heart of the City Special Area The Heart of the City will remain the core commercial cor- ridor in Cupertino, with a series of commercial and mixed- use centers and a focus on creating a walkable, bikeable boulevard that can support transit. General goals, policies and strategies will apply throughout the entire area; while more specific goals, policies and strategies for each sub- area are designed to address their individual settings and characteristics. Policy LU-13.1: Heart of the City Specific Plan The Heart of the City Specific Plan provides design stan- dards and guidelines for this area, which promote a cohe- sive, landscaped boulevard that links its distinct sub-areas and is accessible to all modes of transportation. Policy LU-13.2: Redevelopment Encourage older properties along the boulevard to be redeveloped and enhanced. Allow more intense develop- ment only in nodes and gateways as indicated in the Community Form Diagram (Figure LU-1). GOAL LU-13 ENSURE A COHESIVE, LANDSCAPED BOULEVARD THAT SUPPORTS ALL MODES OF TRANSPORTATION, LINKS ITS DISTINCT AND ACTIVE COMMERCIAL AND MIXED-USE SUB-AREAS AND NODES, AND CREATES A HIGH-QUALITY, DISTINCT COMMUNITY IMAGE AND A VIBRANT HEART FOR CUPERTINO 192 LU-48 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Policy LU-13.3: Parcel Assembly Encourage the assembly of parcels to foster new develop- ment projects that can provide high-quality development with adequate buffers for neighborhoods. Policy LU-13.4: Neighborhood Centers and Activity Areas A majority of the commercial development allocation should be devoted to rehabilitating neighborhood cen- ters and major activity centers with a focus on creating pedestrian-oriented, walkable and bikeable areas with invit- ing community gathering places. Land uses between the activity centers should help focus and support activity in the centers. Neighborhood centers should be retrofitted and redeveloped using the “neighborhood concept” discussed earlier in this Element. Policy LU-13.5: Land Use The Heart of the City area allows a mix of retail, commer- cial, office and residential uses. Specific uses are provided in the Heart of the City Specific Plan. See Figure LU-1 for residential densities and criteria. Policy LU-13.6: Building Form Buildings should be high-quality, with pedestrian-oriented and active uses along the street. Policy LU-13.7: Streetscape and Connectivity Create a walkable and bikeable boulevard with active uses and a distinct image for each subarea. Strategy LU-13.7.1: Streetscape. Provide active uses along the street frontage, bike lanes, sidewalks that support pedestrian-oriented activity, improved pedestrian crossings at street intersections, and attractive transit facilities (e.g., bus stops, benches, etc.). 193 LU-49 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Strategy LU-13.7.2: Street trees and landscaping. Create a cohesive visual image with street tree plantings along the corridor, but with distinct tree types for each sub-area to support its distinct character and function. Strategy LU-13.7.3: Connectivity. Properties with a block should be inter-connected with shared access drives. Provide pedestrian paths to enhance public access to and through the development. New development, particularly on corner lots, should provide pedestrian and bicycle improvements along side streets to enhance connections to surrounding neighborhoods. Strategy LU-13.7.4: Traffic calming. Evaluate options on Stevens Creek Boulevard to improve the pedestrian environment by proactively managing speed limits, enforce- ment, and traffic signal synchronization. Policy LU-13.7: Neighborhood buffers. Consider buffers such as setbacks, landscaping and/or building transitions to buffer abutting single-family residen- tial areas from visual and noise impacts. West Stevens Creek Boulevard Subarea Policy LU-14.1: Land Use Primary land uses include quasi-public/public facilities, with supporting mixed commercial/residential uses. GOAL LU-14 CREATE A PUBLIC AND CIVIC GATEWAY SUPPORTED BY MIXED- COMMERCIAL AND RESIDENTIAL USES 194 LU-50 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Policy LU-14.2: Streetscape Street tree planting that supports an active, pedestrian- oriented environment. Street tree planting should provide a connection with the adjacent foothills with trees such as oaks. Policy LU-14.3: Gateway Concept Buildings should be high-quality in keeping with the gateway character of the area. Projects should provide or contribute towards gateway signs and landscaping. Policy LU-14.4: De Anza College Node Buildings should be designed to fit into the surroundings with pedestrian-orientation. Externalizing activities by providing cafeterias, bookstores and plazas along the street and near corners is encouraged. Policy LU-14.5: Oaks Gateway Node This is a gateway retail and shopping node. New residen- tial and office uses, if allowed, should be designed on the “mixed-use village” concept discussed earlier in this Element. Policy LU-14.6: Community Recreation Node Contribute to the high-quality streetscape with trees, sidewalks, building and site design, and active uses such as main entries, lobbies or similar features along the street to reinforce pedestrian orientation. 195 LU-51 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Crossroads Subarea Policy LU-15.1: Crossroads Streetscape Plan Create a streetscape plan for the Crossroads Subarea that provides design standards and guidelines for an attractive, walkable, vibrant shopping village, where commercial and roadway design encourage pedestrian activity. The plan will include the following elements: 1. Land use plan specifying the type, intensity and arrangement of land uses to promote pedestrian and business activity. 2. Streetscape plan that provides for an attractive pedes- trian streetscape. 3. Design guidelines that foster pedestrian activity and a sense of place. Strategy LU-15.1.1: Uses. Include in this subarea pri- mary uses such as retail, office and commercial. Ground floor uses shall have active retail uses with storefronts. Commercial office and office uses may be allowed on upper levels. In the case of deep lots, buildings along the street should provide retail and buildings in the back may be developed with allowed uses. See Figure LU-1 for residen- tial densities and criteria. GOAL LU-15 CREATE AN ACTIVE, PEDESTRIAN- ORIENTED SHOPPING DISTRICT WITH VIBRANT RETAIL USES AND ENTRIES ALONG THE STREET, OUTDOOR DINING AND PLAZAS OR PUBLIC GATHERING SPACES 196 LU-52 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Strategy LU-15.1.2: Streetscape. Primary ground-floor entrances shall face the street. The streetscape shall consist of wide pedestrians sidewalks with inviting street furniture, street trees, pedestrian-scaled lighting with banners, small plazas, art/water features, pedestrian crosswalks with special paving, and other elements identified in the Crossroads Streetscape Plan. Strategy LU-15.1.3: Building form. Buildings should be moderately-scaled with high-quality, pedestrian-oriented scaled, active uses along the street. Buildings in the North Crossroads node may have taller heights per the Community Form Diagram (Figure LU-1). Strategy LU-15.1.4: Shared parking. Require shared park- ing and access arrangements throughout the area, with overall parking standards reflecting the shared parking. Strategy LU-15.1.5: De Anza Boulevard/Stevens Creek Boulevard landmark. Secure landscape easements from properties at the intersection of De Anza Stevens Creek Boulevards for construction of a future landmark. The landmark may include open space, landscaping and other design elements at the corners. Land at the southeast cor- ner will remain a publicly accessible park. 197 LU-53 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT City Center Subarea Policy LU-16.1: City Center Node Establish the City Center Node as a moderately-scaled, medium-density mixed-use office, hotel, retail and residen- tial area, with an integrated network of streets and open space. Strategy LU-16.1.1: Uses. A mix of uses including, office, hotel, retail, residential and civic uses. The ground floor of buildings along the street should be activated with pedestrian-oriented, active uses including retail, restaurants, and entries. See Figure LU-1 for residential densities and criteria. Strategy LU-16.1.2: Connectivity. New development should improve the connectivity within the block and with surrounding streets, including connections to the Crossroads Subarea. Strategy LU-16.1.3: Building form. Buildings should be moderately-scaled to transition from existing taller buildings to the scale of the surrounding area. Additional heights may be approved in specific areas by the City Council as part of the Community Benefits Program and per heights allowed in the Community Form Diagram (Figure LU-1). Taller build- ings should provide appropriate transitions to fit into the surrounding area. GOAL LU-16 MAINTAIN A MIXED-USE AND CIVIC DISTRICT THAT WILL ENHANCE COMMUNITY IDENTITY AND ACTIVITY, AND SUPPORT THE CROSSROADS SUBAREA 198 LU-54 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Strategy LU-16.1.4: Gateway concept. Buildings should be designed with high-quality architecture and landscaping befitting the gateway character of the site. Strategy LU-16.1.5: Open space. A publicly-accessible park shall be retained at the southeast corner of Stevens Creek and De Anza Boulevard and shall include public art, seating areas and plazas for retail and restaurant uses along the ground floor of adjacent buildings. Policy LU-16.2: Civic Center Node Create a civic heart for Cupertino that enables community building by providing community facilities, meeting and gathering spaces, public art, and space for recreation and community events. Central Stevens Creek Boulevard Subarea Policy LU-17.1: Land Use Allow a mix of uses including commercial, retail, com- mercial office and limited residential uses. The ground floor of buildings along the street should be activated with pedestrian-oriented, active uses including retail, restaurants, entries, etc. Neighborhood centers shall be remodeled or redeveloped using the “neighborhood center” format described earlier in this Element. See Figure LU-1 for resi- dential densities and criteria. GOAL LU-17 RETAIN AND ENHANCE AS A WALKABLE, BIKEABLE, COMMERCIAL MIXED-USE BOULEVARD WITH NEIGHBORHOOD CENTERS, OFFICE AND LIMITED RESIDENTIAL USES 199 LU-55 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT East Stevens Creek Boulevard Subarea Policy LU-18.1: Land Use Allow regional commercial with retail, commercial, office and hotels as the primary uses, with residential mixed-use as a supporting use. Retail, restaurant and other actives uses are highly encouraged on the ground floor facing the street. In case of office complexes, active uses such as entries, lobbies or plazas should be provided on the ground floor along the street. Neighborhood centers shall be remodeled or redeveloped using the “neighborhood center” format described earlier in this Element. See Figure LU-1 for residential densities and criteria. Policy LU-18.2 South Vallco Retain and enhance the South Vallco area as a mixed-use retail, office and residential district with a pedestrian- oriented, downtown atmosphere. Strategy LU-18.2.1: Uses. Encourage a mix of retail, commercial, office, residential and hotel uses. Provide active retail uses on the ground floor facing the street or outdoor pedestrian corridor with connections to adjacent development. Office sites to the north of Vallco Parkway are encouraged to provide retail uses. However, if retail is not provided, office sites should provide entries and active uses along the street frontage. GOAL LU-18 CREATE A WALKABLE, BIKEABLE MIXED-USE BOULEVARD WITH PEDESTRIAN-ORIENTED REGIONAL AND NEIGHBORHOOD COMMERCIAL, RETAIL, HOTEL AND OFFICE USES 200 LU-56 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Strategy LU-18.2.2: Vallco Parkway. Vallco Parkway is envisioned as a parkway with bike lanes, wide sidewalks, street-trees and on-street parking. The street will connect to a future street grid in the Vallco Shopping District. Vallco Shopping District Special Area The City envisions a complete redevelopment of the exist- ing Vallco Fashion Mall into a vibrant mixed-use “town center” that is a focal point for regional visitors and the community. This new Vallco Shopping District will become a destination for shopping, dining and entertainment in the Santa Clara Valley. Policy LU-19.1: Specific Plan Create a Vallco Shopping District Specific Plan prior to any development on the site that lays out the land uses, design standards and guidelines, and infrastructure improvements required. The Specific Plan will be based on the following strategies: Strategy LU-19.1.1: Master Developer. Redevelopment will require a master developer in order remove the obstacles to the development of a cohesive district with the highest levels of urban design. Strategy LU-19.1.2: Parcel assembly. Parcel assembly and a plan for complete redevelopment of the site is required prior to adding residential and office uses. Parcelization is highly discouraged in order to preserve the site for redevel- opment in the future. GOAL LU-19 CREATE A DISTINCT AND MEMORABLE MIXED-USE “TOWN CENTER” THAT IS A REGIONAL DESTINATION AND A FOCAL POINT FOR THE COMMUNITY 201 LU-57 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Strategy LU-19.1.3: Complete Redevelopment. The “town center” plan should be based on complete redevel- opment of the site in order to ensure that the site can be planned to carry out the community vision. Strategy LU-19.1.4: Land use. The following uses are allowed on the site (see Figure LU-1 for residential densi- ties and criteria): 1. Retail: High-performing retail, restaurant and entertain- ment uses. Maintain a minimum of 600,000 square feet of retail that provide a good source of sales tax for the City. Entertainment uses may be included but shall con- sist of no more than 30 percent of retail uses. 2. Hotel: Encourage a business class hotel with conference center and active uses including main entrances, lob- bies, retail and restaurants on the ground floor. 3. Residential: Allow residential on upper floors with retail and active uses on the ground floor. Encourage a mix of units for young professionals, couples and/or active seniors who like to live in an active “town center” environment. 4. Office: Encourage high-quality office space arranged in a pedestrian-oriented street grid with active uses on the ground floor, publicly-accessible streets and plazas/ green space. Strategy LU-19.1.5: “Town Center” layout. Create streets and blocks laid out using “transect planning” (appropriate street and building types for each area), which includes a discernible center and edges, public space at center, high quality public realm, and land uses appropriate to the street and building typology. Strategy LU-19.1.6: Connectivity. Provide a newly config- ured complete street grid hierarchy of streets, boulevards 202 LU-58 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT and alleys that is pedestrian-oriented, connects to existing streets, and creates walkable urban blocks for buildings and open space. It should also incorporate transit facilities, provide connections to other transit nodes and coordinate with the potential expansion of Wolfe Road bridge over Interstate 280 to continue the walkable, bikeable boulevard concept along Wolfe Road. The project should also con- tribute towards a study and improvements to a potential Interstate 280 trail along the drainage channel south of the freeway and provide pedestrian and bicycle connections from the project sites to the trail. Strategy LU-19.1.7: Existing streets. Improve Stevens Creek Boulevard and Wolfe Road to become more bike and pedestrian-friendly with bike lanes, wide sidewalks, street trees, improved pedestrian intersections to accommodate the connections to Rosebowl and Main Street. Strategy LU-19.1.8: Open space. Open space in the form of a central town square on the west and east sides of the district interspersed with plazas and “greens” that create community gathering spaces, locations for public art, and event space for community events. Strategy LU-19.1.9: Building form. Buildings should have high-quality architecture, and an emphasis on aesthet- ics, human scale, and create a sense of place. Additional heights may be approved in specific areas by the City Council as part of the Community Benefits Program and per heights allowed in the Community Form Diagram (Figure LU-1). Taller buildings should provide appropriate transi- tions to fit into the surrounding area. Strategy LU-19.1.10: Gateway character. High-quality buildings with architecture and materials befitting the gateway character of the site. The project should provide gateway signage and treatment. 203 LU-59 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Strategy LU-19.1.11: Phasing plan. A phasing plan that lays out the timing of infrastructure, open space and land use improvements that ensures that elements desired by the community are included in early phases. Strategy LU-19.1.12: Parking. Parking in surface lots shall be located to the side or rear of buildings. Underground parking beneath buildings is preferred. Above grade structures shall not be located along major street frontages. In cases, where above-grade structures are allowed along internal street frontages, they shall be lined with retail, entries and active uses on the ground floor. All parking structures should be designed to be architecturally compat- ible with a high-quality “town center” environment. Strategy LU-19.1.13: Trees. Retain trees along the Interstate 280, Wolfe Road and Stevens Creek Boulevard to the extent feasible, when new development are proposed. Strategy LU-19.1.14: Neighborhood buffers. Consider buffers such as setbacks, landscaping and/or building tran- sitions to buffer abutting single-family residential areas from visual and noise impacts. 204 LU-60 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT North Vallco Park Special Area The North Vallco Park Special Area is envisioned to become a sustainable, office and campus environment surrounded by a mix of connected, high-quality, pedestrian-oriented retail, hotels and residential uses. Taller buildings could be built at gateway nodes close to Interstate 280. Policy LU-20.1: Land Use This area is a major employment node with office, and research and development uses. Retail and hotel uses are allowed on the west side of Wolfe Road. Redevelopment of the retail site at the corner of Wolfe and Homestead Roads should be based on the neighborhood center concept. Retail uses are not required on the Hamptons site. See Figure LU-1 for residential densities and criteria. Policy LU-20.2: Streetscape and Connectivity Future roadway improvements on Wolfe Road, Homestead Road and Tantau Avenue should be coordinated with planned improvements to improve pedestrian, bike and transit connections. Streetscape improvements will enhance the pedestrian environment with street trees, attractive bus shelters and street furniture. The campus site should provide an attractive landscaped edge along the street. Future improvements to the Wolfe Road bridge should be coordinated to preserve the vision for this area. GOAL LU-20 SUPPORT A SUSTAINABLE CAMPUS ENVIRONMENT THAT IS SERVED BY A MIX OF PEDESTRIAN-ORIENTED RETAIL AND COMMERCIAL USES IN A WALKABLE AND BIKEABLE ENVIRONMENT 205 LU-61 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Policy LU-20.3: Building Form Buildings in the retail and hotel area should provide active, pedestrian-oriented uses along the street. Buildings should transition to fit the scale of the surrounding area. Additional heights may be approved in specific areas by the City Council as part of the Community Benefits Program and per heights allowed in the Community Form Diagram (Figure LU-1). Taller buildings should provide appropriate transi- tions to fit into the surrounding area. In addition to the height limits established in the Community Form Diagram, buildings abutting the campus shall incorporate appropriate setbacks, landscaped buffering, and building height transi- tions to minimize privacy and security impacts. Policy LU-20.4: Community Amenities Pedestrian-oriented retail and hotel development will support a diverse population of workers and residents in the area. Trail routes, and alternate trail routes to address security and privacy concerns of major employers, shall be developed to provide pedestrian and bicycle connections to other destinations. Policy LU-20.5: Gateway Concept Building and landscape design should be of high qual- ity and reflect the fact that this area is a gateway into Cupertino from Interstate 280 and points north. The project should provide gateway signage and treatment. Policy LU-20.6: Neighborhood Buffers Provide building transitions, setbacks and/or landscaping to buffer development from adjoining single-family residential uses. 206 LU-62 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT North De Anza Special Area The North De Anza Special Area is expected to remain an employment node. Its designation as a Priority Development Area (PDA) and the availability of restaurants and services in the Heart of the City Special Area opens opportunities to locate higher density office uses along the corridor with connections to Stevens Creek Boulevard in a pedestrian and bicycle-oriented format. The streets in this area are envisioned to work as a walkable, bikeable grid that enhance connections for school children and residents from the Garden Gate neighborhood to Lawson Middle School and other services on the east side. Policy LU-21.1: Conceptual Plan Amend the North De Anza Conceptual Plan to create a cohesive set of land use and streetscape regulations and guidelines for the North De Anza area. Policy LU-21.2: Land Use Primarily office, and research and development uses supple- mented with limited commercial and residential uses. See Figure LU-1 for residential densities and criteria. Policy LU-21.3: Streetscape and Connectivity North De Anza is envisioned as a walkable, bikeable bou- levard with wide sidewalks with street trees and roadway GOAL LU-21 MAINTAIN AN EMPLOYMENT NODE SERVED BY A MIX OF PEDESTRIAN- ORIENTED RETAIL, COMMERCIAL AND HOTEL USES IN A WALKABLE AND BIKEABLE ENVIRONMENT 207 LU-63 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT improvements for bike lanes and pedestrian crossings. Pedestrian and bike improvements and enhanced pedes- trian crossings are also envisioned along other streets in this area to create an interconnected grid. Such improvements will also improve school routes from the Garden Gate neighborhood to Lawson school to the east and provide access to transit routes. Policy LU-21.4: Building Design Locate buildings along the street with parking areas to the rear. Break up massing of large office buildings along the street with pedestrian scaled elements and locate building entries and active uses along the street frontage to improve the pedestrian character of the area. Mixed-use buildings should include entries, active uses and gathering spaces along the street. Policy LU-21.5: Gateway Concept Building and landscape design should be of high qual- ity and reflect the fact that this area is a gateway into Cupertino from Interstate 280 and points north. Policy LU-21.6: Neighborhood Buffer Provide building transitions, setbacks and/or landscaping to buffer development from adjoining single-family residential uses. 208 LU-64 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT South De Anza Special Area The South De Anza Special Area will remain a predominant- ly general commercial area with supporting existing mixed residential uses with neighborhood centers providing ser- vices to neighborhoods and nodes. The policies in this area are intended to encourage parcel assembly to resolve the fragmented and narrow lot pattern, promote active retail and service uses, bike and pedestrian friendly improve- ments, and connectivity to adjacent neighborhoods. Policy LU-22-1: Conceptual Plan Create a conceptual plan that combines the existing South De Anza and Sunnyvale-Saratoga Conceptual Plans to cre- ate a cohesive set of land use and streetscape regulations and guidelines for the South De Anza area. Policy LU-22.2: Land Use General commercial and retail uses with limited commercial office, office and residential uses. Neighborhood centers should be redeveloped in the “neighborhood center” format discussed in this Element. See Figure LU-1 for resi- dential densities and criteria. GOAL LU-22 MAINTAIN A COMMERCIAL BOULEVARD WITH NEIGHBORHOOD CENTERS, COMMERCIAL OFFICE AND RESIDENTIAL USES THAT PROVIDE SERVICES AND GATHERING SPACES FOR THE COMMUNITY IN A WALKABLE AND BIKEABLE ENVIRONMENT 209 LU-65 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Policy LU-22.3: Parcel Assembly Highly encourage assembly of parcels to resolve the frag- mented and narrow lot pattern and encourage high-quality development with adequate buffers for neighborhoods. Policy LU-22.4: Streetscape and Connectivity South De Anza is envisioned as a walkable, bikeable boule- vard with sidewalks, street trees and roadway improvements for bike lanes and pedestrian crossings. Side streets are also envisioned with pedestrian and bicycle improvements to ensure walkable connections from adjacent neighborhoods. Policy LU-22.5: Shared Access Since South De Anza is a heavily traveled route, proper- ties in the same block should be connected with auto and pedestrian access through shared access easements to reduce impacts on the corridor. Policy LU-22.6: Building Design Located buildings and commercial pads along the street with parking areas to the side and rear. Provide pedestrian- scaled elements and active uses including retail, restaurants, and entries along the street. Outdoor plaza and activity areas can be located along the street with sidewalk and street trees to buffer them from through traffic. Policy LU-22.7: Gateway Concept Building and landscape design should be of high qual- ity and reflect the fact that this area has gateways from Highway 85 and at the southern and eastern borders of Cupertino. 210 LU-66 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Policy LU-22.8: Neighborhood Buffer Provide building transitions, setbacks and/or landscaping to buffer development from adjoining single-family residential uses. Homestead Special Area The Homestead Special Area will continue to be a predomi- nantly mixed-use retail commercial area with residential uses and neighborhood centers providing services to local residents. Bike and pedestrian improvements to the roadways in this area will provide better connections for residents and workers to access services. Tree-lined streets and sidewalks will provide an inviting environment and will link existing and new uses. Policy LU-23.1: Conceptual Plan Create a conceptual plan for the Homestead cor- ridor Special Area with a cohesive set of land use and streetscape regulations and guidelines for the South De Anza area. GOAL LU-23 RETAIN A COMMERCIAL AND RESIDENTIAL BOULEVARD THAT FORMS A GATEWAY INTO CUPERTINO WITH NEIGHBORHOOD CENTERS, COMMERCIAL OFFICE AND RESIDENTIAL USES THAT PROVIDE SERVICES AND GATHERING SPACES FOR THE COMMUNITY IN A WALKABLE AND BIKEABLE ENVIRONMENT 211 LU-67 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Policy LU-23.2: Land Use Primarily retail, commercial and residential uses, with some limited quasi-public use. Redevelopment of neighborhood centers should be based on the “neighborhood center” concept discussed earlier in this element. See Figure LU-1 for residential densities and criteria. Policy LU-23.3: Connectivity Homestead Road is envisioned to become a boulevard with bike and pedestrian improvements and new bicycle and pedestrian crossings at De Anza Boulevard, Blaney Avenue, Wolfe Road, and Tantau Avenue. This will provide better access for people moving east/west through the city north of Interstate 280, linking neighborhoods in the western part of the city with Homestead High School, Homestead Square Shopping Center and Apple Campus 2 to the east. Policy LU-23.4: Building Design Buildings will be located closer to the street with parking mostly to the side and rear. In the case of larger sites, large buildings may be placed behind parking; however a substantial portion of the front of the site should be lined with active uses such as retail/restaurant pads, and plazas. Buildings should include pedestrian-oriented elements with entries, retail, lobbies, and active uses along the street. Parking areas along the street will be screened with street trees. Residential buildings will provide stoops and porches along the street and side streets. Additional heights may be approved in specific areas by the City Council as part of the Community Benefits Program and per heights allowed in the Community Form Diagram (Figure LU-1). Taller build- ings should provide appropriate transitions to fit into the surrounding area. 212 LU-68 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Policy LU-23.5: Gateway Concept Building and landscape design should be of high quality and reflect the fact that this area is a gateway into the northern part of Cupertino. Policy LU-23.6: Neighborhood Buffer Provide building transitions, setbacks and/or landscaping to buffer development from adjoining single-family residential uses. Bubb Road Special Area The Bubb Road Special Area is envisioned to become a tree-lined avenue that is bike and pedestrian friendly with an improved public and internal street grid, since it is a well-traveled route by school children from the northern and eastern sections of the city to the tri-school area to the south, and increased foot traffic from workers in the area. Policy LU-24.1: Land Use Allowed uses in the Bubb Road Special Area will consist of those described in the ML-RC ordinance with limited com- mercial and residential uses. GOAL LU-24 MAINTAIN AN EMPLOYMENT AREA WITH LIGHT-INDUSTRIAL, AND RESEARCH AND DEVELOPMENT USES IN A WALKABLE AND BIKEABLE ENVIRONMENT THAT CONNECTS TO SURROUNDING NODES AND SERVICES 213 LU-69 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Policy LU-24.2: Streetscape and Connectivity Bubb Road is envisioned as a walkable, bikeable corridor with sidewalks, street trees and roadway improvements for bike lanes and pedestrian crossings. Pedestrian and bike improvements and enhanced pedestrian crossings are also envisioned along other streets in this area to create an interconnected grid. Such improvements will also improve routes from the northern and eastern neighborhood to the tri-school area, parks and services and reduce impacts caused by to school and employment traffic. Policy LU-24.3: Building and Site Design Locate buildings along the street with parking areas to the rear. Break up massing of large office buildings along the street with pedestrian-scaled elements and locate building entries and active uses along the street frontage to improve the pedestrian character of the area. Policy LU-24.4: Compatibility of Use The compatibility of non-industrial uses with industrial uses must be considered when reviewing new development. Policy LU-24.5: Neighborhood Buffers New industrial uses should provide building transitions, setbacks and landscaping to provide a buffer for adjoining low-intensity residential uses. 214 LU-70 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Monta Vista Village The Monta Vista Village Special Area is envisioned to be retained as a small town, pedestrian-oriented mixed-use area within Cupertino. As incremental change occurs, the City will identify opportunities to enhance the areas uses that are consistent with the small town character. Policy LU-25.1: Conceptual Plan Continue to govern Monta Vista’s commercial area through the Monta Vista Design Guidelines. The guidelines provide direction for architecture, landscaping and public improve- ments. Create a Monta Vista Village Conceptual Plan to with a cohesive set of updated regulations and guidelines for this area. Policy LU-25.2: Land Use Encourage the commercial district to serve as a neighbor- hood commercial center for Monta Vista Village and its adjoining neighborhoods. Mixed-use with residential is encouraged. The industrial area should be retained to provide small-scale light industrial and service industrial opportunities, while remaining compatible with the sur- rounding residential and commercial uses. See Figure LU-1 for residential densities and criteria. GOAL LU-25 RETAIN AND ENHANCE MONTA VISTA VILLAGE’S SMALL TOWN CHARACTER AS A PEDESTRIAN-ORIENTED, SMALL SCALE, MIXED-USE RESIDENTIAL, NEIGHBORHOOD COMMERCIAL AND INDUSTRIAL AREA 215 LU-71 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Policy LU-25.3: Building and Site Design Encourage buildings to be designed in a way that promotes the small-scale, older and mixed-use character of the area. Buildings should be located along the street with pedestrian-scale architecture and retail and active uses on the ground floor. Parking should be located to the rear. Strategy LU-25.3.1: Storefront appearance. Commercial and office buildings shall include a storefront appearance to the public street, and shall not be separated from the pub- lic sidewalk by extensive landscaping or changes in eleva- tion. Office buildings shall be designed to accommodate future entrances from the sidewalk for future retail uses. Strategy LU-25.3.2: Parking. Commercial properties or commercial portions of properties may rely on public parking on Pasadena and Imperial Avenues to meet their off-site parking needs within the area bounded by Granada Avenue, Stevens Creek Boulevard, Orange Avenue and the Union Pacific right-of-way (see diagram to the right). Policy LU-25.4: Street Design and Connectivity Maintain Monta Vista Village as a walkable, bikeable mixed- use neighborhood with sidewalks, street trees and roadway improvements for bike lanes and sidewalks with routes to the tri-school area. Automobile, pedestrian and bicycle improvements are envisioned along other streets in this area to create an interconnected grid and with new devel- opment to remove street blockages and promote a network of streets. On-street parking is encouraged. Roadway and sidewalk improvements will also improve school routes from the northern neighborhoods to the tri-school area. Strategy LU-25.4.1: Interconnected access. Individual properties shall have interconnected pedestrian and vehicle access and shared parking. CREEK BLVDSTEVENS H i g h w a y 8 5 Area where property owners can obtain credit for on-street parking for commercial activities. GRANADA AVE HERMOSA AVE LOMITA AVE ALMADEN AVE SAN FERNANDO AVE ALCAZAR AVE B U B B R D PA S A D E N A A V E OR AN GE AV E McCLELLAN RD IM P E R I A L A V E DOLORES AVE DR I V E PH A R L A P MA N N D R I V E BY R N E A V E 216 LU-72 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Strategy LU-25.4.2. Residential streets. Residential street improvements may have a semi-rural appearance based on the Municipal Code requirements. Safe routes to school streets, or any others designated by the City Council shall be required to have sidewalks and street trees. Other Non-Residential/Mixed-Use Special Areas In addition to the major mixed-use corridors described above, other Non-Residential/Mixed-Use Areas are located throughout the city. These include the following: west side of Stevens Canyon Road across from McClellan Road; inter- section of Foothill Boulevard and Stevens Creek Boulevard; Homestead Road near Foothill Boulevard; northwest corner of Bollinger Road and Blaney Avenue; and all other non- residential properties not referenced in an identified Special Area. These areas are envisioned as neighborhood centers that serve as shopping, services and gathering places for adja- cent neighborhoods in a pedestrian-oriented environment that encourages pedestrian and bicycle access. Policy LU-26.1: Land Use Retrofit or redevelop neighborhood centers using the “neighborhood center” concept discussed earlier in this GOAL LU-26 RETAIN COMMERCIAL AREAS ADJACENT TO NEIGHBORHOODS AND RETROFIT OR ENCOURAGE REDEVELOPMENT AS NEIGHBORHOOD CENTERS IN A PEDESTRIAN-ORIENTED AND BIKE- FRIENDLY ENVIRONMENT 217 LU-73 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Element. Areas that are not designated as “neighborhood centers” are encouraged to provide commercial uses with active uses such as entries, lobbies, seating areas or retail along the street. See Figure LU-1 for residential densities and criteria. Policy LU-26.2: Building and Site Design Encourage buildings to be designed in a pedestrian-ori- ented format. Buildings should be located along the street with pedestrian-scale architecture and retail and active uses on the ground floor. Parking should be located to the sides or rear. Buildings may be one to two stories in height. In some instances where taller heights are allowed, buildings may be three stories in height. Policy LU-26.3: Street Design and Connectivity Create neighborhood centers that are walkable, bikeable areas with sidewalks, street trees and roadway improve- ments for bike lanes and sidewalks to provide connections to the neighborhoods that they serve. Policy LU-26.4: Neighborhood Buffers Encourage projects to include building transitions, setbacks and landscaping to provide a buffer for adjoining low- intensity residential uses. 218 LU-74 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Neighborhoods The City has many neighborhoods, each with its own distinctive character and setting. These neighborhoods play a vital role in supporting Cupertino’s great quality of life. Neighborhood goals and policies help preserve and enhance the quality of life by protecting neighborhood character and improving walking and biking connections to parks, schools and services. Neighborhoods typically offer a variety of housing choices to meet a spectrum of community needs. The following general goal, policies and strategies apply to all neighborhoods in the city. Policy LU-27.1: Compatibility Ensure that new development within and adjacent to resi- dential neighborhoods is compatible with neighborhood character. Strategy LU-27.1.1: Regulations. Maintain and update design regulations and guidelines for single-family devel- opment that address neighborhood compatibility and visual and privacy impacts. Strategy LU-27.1.2: Neighborhood Guidelines. Identify neighborhoods that have a unique architectural style, historical background or location and develop plans that preserve and enhance their character. Support special zon- ing or design guidelines (e.g., the Fairgrove Eichler neigh- borhood) and single-story overlay zones in neighborhoods, where there is strong neighborhood support. GOAL LU-27 PRESERVE NEIGHBORHOOD CHARACTER AND ENHANCE CONNECTIVITY TO NEARBY SERVICES TO CREATE COMPLETE NEIGHBORHOODS 219 LU-75 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Strategy LU-27.1.3: Flexibility. When neighborhoods are in transition, add flexibility for requirements for new devel- opment that acknowledge the transition while continuing to respect the existing neighborhood. Strategy LU-27.1.4: Late Night Uses. Discourage late- evening entertainment activities such as night-clubs in commercial areas where parcels are especially narrow, abut single-family residential development, and cannot adequately provide visual and noise buffers. Policy LU-27.2: Relationship to the Street Ensure that new development in and adjacent to neighbor- hoods improve the walkability of neighborhoods by provid- ing inviting entries, stoops and porches along the street frontage, compatible building design and reducing visual impacts of garages. Policies LU-27.3: Entries. Define neighborhood entries through architecture, or land- scaping appropriate to the character of the neighborhood. Gates are discouraged because they isolate developments from the community. Policy LU-27.4: Connections. Support pedestrian and bicycling improvements that improve access with neighborhoods to parks, schools and local retail, and between neighborhoods. Support traffic calming measures rather than blocking the street to reduce traffic impacts on neighborhoods. Policy LU-27.5: Streets. Determine appropriate street widths, bike lane, sidewalk and streetlight design to define the unique character of neighborhoods, where appropriate. 220 LU-76 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Policy LU-27.6. Multi-family Residential Design. Maintain an attractive, livable environment for multi-family dwellings. Strategy LU-27.6.1: Provide Active and Passive Outdoor Areas in Multi-Family Residential Development. Allow public access to the common outdoor areas wherever possible. Strategy LU-27.6.2: Ordinance Updates. Update the Planned Development (residential) and R-3 ordinances to achieve the policies and strategies applicable to multi- family development in neighborhoods. Policy LU-27.6: Compatibility of Lots Ensure that zoning, subdivision and lot-line adjustment requests related to lot size or lot design consider the need to preserve neighborhood lot patterns. Strategy LU-27.6.1: Lot Size. Ensure that subdivision and lot-line adjustment requests respect the neighborhood lot size patterns. Consider revisions to lot size requirements if the neighborhood lot pattern is different from the zoning requirements. Strategy LU-27.6.2: Flag Lots. Allow flag lots only in cases where they are the sole alternative to integrate subdivisions with the surrounding neighborhood. Policy LU-27.7: Protection Protect residential neighborhoods from noise, traffic, light and visually intrusive effects from more intense develop- ment with landscape buffers, site design, setbacks and other appropriate measures. Policy LU-27.8: Amenities and Services Improve equitable distribution of community amenities such as parks and access to shopping within walking and bicycling distance of neighborhoods. 221 LU-77 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Inspiration Heights Neighborhood The Inspiration Heights neighborhood will continue to be a low-intensity and hillside residential area. Future develop- ment should consider preservation of hillsides, riparian corridors, and plant and animal wildlife habitat through sen- sitive site and building design. This area has developments that were annexed from the county. Legal, non-conforming uses and buildings in such areas are granted additional flexibility. Policy LU-28.1: Connectivity Improve bicycle and pedestrian environment along Foothill Boulevard and Stevens Canyon Road to improve neighbor- hood connectivity to services as well for hikers and bikers accessing natural open space areas in the vicinity. Policy LU-28.2: Merriman-Santa Lucia Neighborhood Allow legal, non-conforming duplexes to remain in the area bounded by Santa Lucia Road, Alcalde Road and Foothill Boulevard. GOAL LU-28 RETAIN INSPIRATION HEIGHTS AS A LOW-INTENSITY RESIDENTIAL AREA IN A NATURAL, HILLSIDE SETTING 222 LU-78 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Oak Valley Neighborhood Policy LU-29.1: Development Intensity Require development intensity for the single-family Oak Valley neighborhood to be consistent with the development agreement that includes the use permit and other approv- als. The development agreement describes development areas, intensity and styles of development, public park dedication, tree protection, access and historic preserva- tion. The theme of the approvals is to balance development with environmental protection by clustering development, setting it back from sensitive environmental areas and pre- serving large areas as permanent open space. Policy LU-29.2: Design Elements Require buildings to reflect the natural hillside setting as required in residential hillside zones with traditional architectural styles and natural materials and colors. Larger building elements should be scaled to respect the existing development in the surrounding area. GOAL LU-29 RETAIN AND ENHANCE THE OAK VALLEY AS A UNIQUE NEIGHBORHOOD SURROUNDED BY NATURAL HILLSIDE AREAS AND PRIVATE AND PUBLIC SPACE 223 LU-79 CHAPTER 3 Land Use and Community Design Element REVISED PUBLIC DRAFT Fairgrove Neighborhood Policy LU-30.1: Development Standards Require all new construction to conform to the R1-e zoning (Single-Family Residential–Eichler). Policy LU-30.2: Design Guidelines Encourage residents to incorporate the design guidelines illustrated in the Eichler Design Guidelines. GOAL LU-30 PRESERVE THE UNIQUE CHARACTER OF THE EICHLER HOMES IN THE FAIRGROVE NEIGHBORHOOD 224 SECTION 4 Circulation and Mobility MOBILITY ELEMENT Chapter 5 5 225 REVISED PUBLIC DRAFT CM-2 226 M-3 CHAPTER 5 Mobility Element REVISED PUBLIC DRAFT CONTENTS M-3 Introduction M-4 Context Regional Transportation Planning Link between Land Use and Transportation Complete Streets Greenhouse Gases and Transportation Pedestrians and Bicyclists Performance Measurement Transportation Network M-14 Looking Forward M-16 Goals and Policies Regional Coordination Complete Streets Walkability and Bikeability Transit Safe Routes to Schools Vehicle Parking Transportation Impact Analysis Greenhouse Gas Emissions and Air Quality Roadway System Efficiency Transportation Infrastructure INTRODUCTION Cupertino’s transportation system is multi-faceted. It integrates walkways, sidewalks, bicycle routes, bus transit facilities, local streets, major roadways and freeways into a single, integrated system that supports the city’s high quality of life. At the local level, this includes facilities that connect neighborhoods with pedestrian, bicycle and auto- mobile routes. Longer distance connections include links to major boulevards, expressways, commuter rail and the regional freeway system. This Element includes goals, policies and strategies that the City will use in making decisions regarding transporta- tion network improvements needed to accommodate Cupertino’s anticipated growth. The purpose for this Element is to implement strategies that make alternative modes of transportation attractive choices. This will help reduce strain on the automobile network and improve health and quality of life for Cupertino residents and businesses. 227 M-4 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT CONTEXT Cupertino’s circulation system was developed mostly in a suburban and auto-oriented pattern during the 1950s and 1960s. Over the years, the City has enhanced its roadway infrastructure with a system of bike lanes, trails, bridges, better sidewalks and publicly accessible connections in new development. Cupertino is also served by many important regional transportation facilities such as Highway 85, Interstate 280, Lawrence Expressway, and bus transit service provided by the Santa Clara Valley Transportation Authority (VTA). The community anticipates reductions in auto traffic impacts, enhancements to the walking and biking environ- ment, improvements to existing transit service, and con- nections to key transit nodes including Caltrain. As such, the goals in this Element respond to current conditions and present policies to adequately address future change. Regional Transportation Planning Cupertino’s local transportation infrastructure is supple- mented by regional facilities and services through agencies such as the VTA, the local congestion-management agency, the Metropolitan Transportation Commission (MTC), the Bay Area’s regional transportation authority, and Caltrans, the State Department of Transportation. Each agency has a long-term plan consisting of policies and projects which are connected to the operational success of Cupertino’s local transportation network. Key projects for these agencies include: • Interchange Improvements at Interstate 280/Highway 85 (MTC–Plan Bay Area) • Stevens Creek Bus Rapid Transit (MTC–Plan Bay Area) 228 M-5 CHAPTER 5 Mobility Element REVISED PUBLIC DRAFT Regional transit service primarily includes bus lines oper- ated by VTA that run along the city’s major corridors, includ- ing Stevens Creek Boulevard, De Anza Boulevard and Wolfe Road, and portions of Homestead Road, Stelling Road and Tantau Avenue. Regional facilities include a bus transit station at De Anza College and within the Vallco Shopping District. As new development projects are proposed, the City will continue to identify opportunities for improve- ments to bus stop facilities, such as the new Apple Campus 2 area at Wolfe Road, Homestead Road and Tantau Avenue and the Main Street project at Tantau and Stevens Creek Boulevard. A relatively new trend in regional commute transportation is the implementation of private bus and shuttle services to connect workers and major employers throughout the Bay Area. While currently this activity is not regulated or organized among these employers, it is beneficial in the regional effort to reduce the reliance on Single Occupancy Vehicles (SOVs). The One Bay Area Grant Program is a new funding approach that better integrates the region’s federal transportation program with California’s landmark climate change law (Assembly Bill 32, 2006) and Sustainable Communities Strategy program (Senate Bill 375, 2008). Funding distribution to the counties considers progress toward achieving local land use and housing policies by: • Supporting the Sustainable Communities Strategy for the Bay Area by promoting transportation investments in Priority Development Areas (PDAs); and • Providing a higher proportion of funding to local agen- cies and additional investment flexibility to invest in bicycle and pedestrian improvements, local streets and roadway preservation and planning activities, while also providing specific funding opportunities for Safe Routes to School (SR2S) and Priority Conservation Areas. 229 M-6 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT The goals and policies included in this Element and the Land Use and Community Design Element seek to take advantage of regional planning and funding efforts. They implement strategies that encourage the location of future growth in Cupertino’s Priority Development Areas area along Stevens Creek Boulevard and portions of De Anza Boulevard, and by advocating for improved service and improvements to regional infrastructure. Link Between Land Use and Transportation In order to maintain and enhance the quality of life for Cupertino residents and businesses, it is important to ensure that future growth does not overwhelm the trans- portation network, identify ways to limit greenhouse gas emissions, and improve the health of our community. Land use and mobility policies included in the General Plan seek to do so by working together to focus future growth along major mixed-use corridors and within PDAs. Mobility policies also seek to improve the walking/biking environ- ment and enhance transit to ensure that the transportation network is accessible to people of all ages and abilities, including school children, the disabled and the elderly. These policies also promote connectivity between neigh- borhoods and services, and between key nodes in order to reduce reliance on the automobile as the sole mode of transportation. Complete Streets The California Complete Streets Act (2008) places the planning, designing and building of “Complete Streets” into the larger planning framework of the General Plan by requiring jurisdictions to plan for multi-modal transportation networks. Complete Streets are designed and operated to enable safe access for all users including pedestrians, bicy- clists, the disabled, motorists, seniors, users of public trans- portation and movers of commercial goods. These networks 230 M-7 CHAPTER 5 Mobility Element REVISED PUBLIC DRAFT allow people to effectively travel to key destinations within their community and the larger region. In addition, all trans- portation projects should be evaluated as to their ability to improve safety, access and mobility for all travelers and recognize pedestrian, bicycle and transit modes as integral elements of their transportation system. Cupertino has already begun the work of reviewing the existing street network and looking for new opportunities to improve alternative modes of transportation through the construction of sidewalks, walking paths, bike lanes, trails and bridges across pedestrian barriers, such as the Don Burnett Bridge at Mary Avenue. The goals and poli- cies in this Element seek to continue the work of making enhancements to the transportation network to encourage all modes of transportation. Greenhouse Gases and Transportation A major challenge of today is meeting the energy needs of a growing population while also protecting air quality and natural resources. The majority of greenhouse gas emis- sions can be attributed to carbon dioxide emissions from the transportation sector. A 2010 inventory of Cupertino’s community-wide emissions shows that transportation accounts for almost 41 percent of community-wide emis- sions. Therefore, reducing the number of automobile trips, particularly from single-occupancy vehicles, can provide the greatest benefit in reducing greenhouse gas emissions in Cupertino. The goals and policies in this Element work in tandem with other General Plan policies to address issues of 231 M-8 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT sustainability, health and air quality by taking advantage of opportunities to reduce greenhouse gas emissions. Low-carbon fuels, new and improved vehicle technologies, and land use strategies and infrastructure improvements to reduce the number of vehicle miles traveled can reduce transportation-related emissions significantly. Pedestrians and Bicyclists Cupertino has made considerable strides improving walk- ability and bikeability with new or improved bike lanes, sidewalks and pedestrian connections. However, many older commercial areas and neighborhoods continue to lack a pedestrian and bike-friendly environment where students can safely walk and bike to school, and families can walk or bike to parks and nearby community facilities and shop- ping. This was a consistent theme expressed by participants during public workshops conducted as part of the General Plan Amendment. Areas are generally considered walkable if people can safely walk to schools, parks and services within a half mile (less than10-14 minutes) distance. A bike-friendly city pro- vides a network of streets and paths where people can bike safely and conveniently to community facilities, employment and shopping. The goals and policies of this Element, along with the City’s Bicycle Transportation Plan and Pedestrian Plan, seek to further improve and enhance the walking and biking environment through capital improvement projects, development review, and retrofitting existing facilities within older commercial areas and neighborhoods. Figure M-1 identifies existing and planned improvements to bicycle and pedestrian facilities in the city. 232 M-9 CHAPTER 5 Mobility Element REVISED PUBLIC DRAFT Performance Measurement Senate Bill 743 (2013) created a process to change the way that transportation impacts are analyzed under the California Environmental Quality Act (CEQA). The process helps achieve the State’s goals for reducing greenhouse gas emissions and traffic-related air pollution, promotes the development of a multi-modal transportation system, and provides clean, efficient access to major destinations. Specifically, the law requires an alternative to automobile level of service (LOS) for evaluating transportation impacts. Particularly within areas served by transit, alternative criteria are required to promote the reduction of greenhouse gas emissions, the development of multi-modal transportation networks, and a diversity of land uses. Like many cities, Cupertino has used LOS as a performance measure to evaluate traffic impacts. Historically, this has led cities to focus entirely on improvements to auto infrastruc- ture, often to the detriment of other modes of transporta- tion. Consistent with State law, this Element seeks to look at performance measures that balance the needs of all modes of transportation, including automobile, walking, biking and transit. Such new measures can range from looking at vehicle miles traveled (VMT) as a measure of balancing land uses to reviewing seconds of delay for all travel modes as a measure of impacts to traffic. This will allow the City to develop and maintain a Transportation Improvement Plan that includes pedestrian, bicycle, transit and automo- bile network enhancements, and Transportation System Management (TSM) and Travel Demand Management (TDM) measures to improve efficiency of the network. 233 M-10 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Figure M-1 Current (2014) and Proposed Bicycle Network F O O T H I L L B L V D ST E L L I N G R D De A N Z A B L V D HOMESTEAD ROAD WO L F E R D STEVENS CREEK BLVD BL A N E Y A V E MI L L E R A V E BOLLINGER RD McCLELLAN ROAD RAINBOW DRIVE BU B B R O A D PROSPECT ROAD TANTAU Stevens Creek Reservoir Sunnyvale Santa Clara San Jose Saratoga Los Altos 01000 0500 20003000 0 0.5 1Mile 1000 Feet Meters Legend City Boundary Heart of the City Boundary Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas * Note: see Complete Streets policy for implementation Bike Lanes on Street Bike Paths Off Street Bike Route Right of Way Public Access N 234 M-11 CHAPTER 5 Mobility Element REVISED PUBLIC DRAFT Transportation Network Cupertino’s transportation network consists of a variety of street types and pathways. The network determines not only how various land uses are connected but also the modes of transportation used by people to access them. Table M-1 defines the various street types and paths in terms of their character, adjoining current and future land uses, modes of travel that they currently support, and improvements needed to enhance access for all modes of transportation. Close alignment of the City’s Capital Improvement Program with Community Vision 2040 prorities will allow the City to strategically plan and direct resources to develop this multi- modal transportation infrastructure. Figure M-2 shows the geographical locations of the major roadways. Transportation Systems Management (TSM) TSM is an approach to conges- tion mitigation that identifies improvements to enhance the capacity of existing roadways through better operations. These techniques help improve traffic flow, air quality and move- ment of vehicles and goods, as well as enhance system accessi- bility and safety. TSM strategies are low-cost and effective, and typically include: intersection and signal improvements; data collection to monitor system performance; and/or special events management strategies. Transportation Demand Management (TDM) TDM seeks to reduce travel demand (specifically that of single-occupancy car) by encouraging other modes of travel through requirements and/or incentives. TDM strate- gies typically include: commute trip reduction programs; parking policies; and/or incentives to take transit or other modes of transportation. 235 M-12 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT TABLE M-1 STREET TYPOLOGY Type Mode(s) of Transportation Guidelines Freeway Limited access, part of a regional and/or State network subject to State design standards. Expressway Limited access, regional and part of a county network subject to County design standards. Boulevard (Arterial)Access and safe crossing for all modes of travel along a regional transportation corridor. May include medians to separate directional travel. City or multi-jurisdictional design standards apply. Main Street Balances all modes of transportation, includes on-street parking and connects to highly pedestrian- oriented uses. Vehicular performance measures may be lowered to prioritize walking and biking. Avenue (Major and Minor Collector) Connector that distributes trips to commercial and residential areas from boulevards, and provides balanced levels of service for auto, bikes and pedestrians. Neighborhood Connector Primarily serves and connects neighborhoods and neighborhood services, and facilitates safe walking and biking. May contain elements of Avenues including landscaped median or bus service. Residential Street Provides access to low-intensity residential uses, prioritizes walking and biking, and are typically good candidates for traffic calming. Regional Pedestrian/ Bike Pathway Part of regional network providing high quality pedestrian and bike paths to connect to other regional destinations. Local Pedestrian/Bike Pathway Connects to regional network but part of local infrastructure, provides quality pedestrian and bike paths connecting local destinations. 236 M-13 CHAPTER 5 Mobility Element REVISED PUBLIC DRAFT FO O T H I L L B L V D ST E L L I N G R D De A N Z A B L V D HOMESTEAD ROAD WO L F E R D STEVENS CREEK BLVD BL A N E Y A V E MI L L E R A V E BOLLINGER RD McCLELLAN ROAD RAINBOW DRIVE BU B B R O A D PROSPECT ROAD 85 280 TANTA U Stevens Creek Reservoir ALVES DR MA R Y A V E LAZANZEO DR RODRIGUE S A V E PACIFICA DR BARNHART AVE KIRWIN LN OR A N G E A V E VI S T A D R MI R A V I S T A R D GREENLEAF DR FI N C H A V E PH A R L A P A V E VOSS AVE PO R T A L A V E MA N N D R COLUMBUS AVE HYANNISPORT DR LI N D A V I S T A D R Sunnyvale Santa Clara San Jose Saratoga Los Altos Freeway 01000 0500 20003000 0 0.5 1Mile 1000 Feet Meters Legend City Boundary Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas Boulevards (Arterials) Avenues (Major Collectors) Neighborhood Connectors N Main Street Avenues (Minor Collectors) Figure M-2 Circulation Network 237 M-14 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT LOOKING FORWARD Maintaining Cupertino’s great quality of life – including convenient access, clean air, and reduced traffic – requires careful management of growth. The City will identify ways to locate appropriate land uses along major mixed-use cor- ridors, improving overall access and connectivity, enhancing the attractiveness of non-vehicular transportation modes, and reducing demand on the roadway network. The fol- lowing are ways the City will address key challenges and opportunities facing Cupertino: 1. Better Linking Land Use and Transportation. How we use our land directly impacts our transportation facili- ties, modes of travel and vice versa. A primary corner- stone of Community Vision 2040 is to focus growth on major mixed-use corridors; support alternate modes of transportation including walking, biking and transit; and encourage a mix of compatible and complementary uses on key sites. These strategies will allow the City to manage growth with reduced traffic, air quality and greenhouse gas impacts. 2. Regional Coordination. The City should continue to participate in regional projects and infrastructure plan- ning to ensure consistency with local planning, and pursue funding for City transportation projects. 3. Connectivity. A key objective of the City is to improve connections through streetscape and pathway improve- ments to ensure that the community enjoys easy walking and biking access to services including parks, schools and shopping. Other strategies seek to supple- ment existing modes of transportation such as commu- nity shuttles through partnerships and agreements and providing links between key transportation nodes. 238 M-15 CHAPTER 5 Mobility Element REVISED PUBLIC DRAFT 4. Demand Reduction. The strategies in this Element seek to reduce demand on the City’s roadway infra- structure through careful land use planning, encourage alternative modes of transportation and utilize best practices in Transportation Demand Management and Transportation Systems Management. 239 M-16 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT GOALS AND POLICIES Regional Coordination Regional transportation and land use decisions affect the operation of the transportation network in Cupertino. A key consideration of the General Plan is for the City to partici- pate in regional planning initiatives in order to coordinate local improvements with regional initiatives, advocate for Cupertino’s needs, and take advantage of programs that can support Cupertino’s transportation infrastructure. Policy M-1.1: Regional Transportation Planning Participate in regional transportation planning processes to develop programs consistent with the goals and policies of Cupertino’s General Plan. Work with neighboring cities to address regional transportation and land use issues of mutual interest. Policy M-1.2: Transportation Impact Analysis Participate in the development of new multi-modal analysis methods and impact thresholds as required by Senate Bill 743. Policy M-1.3: Regional Trail Development Continue to plan and provide for a comprehensive system of trails and pathways consistent with regional systems, GOAL M-1 ACTIVELY PARTICIPATE IN REGIONAL PLANNING PROCESSES TO COORDINATE LOCAL PLANNING AND TO ADVOCATE FOR DECISIONS THAT MEET AND COMPLEMENT THE NEEDS OF CUPERTINO 240 M-17 CHAPTER 5 Mobility Element REVISED PUBLIC DRAFT including the Bay Trail, Stevens Creek Corridor and Ridge Trail. Complete Streets Complete Streets policies encourage the design of streets that respond to the needs of all members of the com- munity, balance different modes of transportation, promote the health and well-being of the community, and support environmental sustainability. Policy M-2.1: Street Design Adopt and maintain street design standards to optimize mobility for all transportation modes including automobiles, walking, bicycling and transit. Policy M-2.2: Adjacent Land Use Design roadway alignments, lane widths, medians, parking and bicycle lanes, and sidewalks to complement adjacent- land uses to keep with the aesthetic vision of the Planning Area. Improvement standards shall also consider the urban, suburban and rural environments found within the city. Strategy M-2.2.1: Rural Road Improvement Standards. Consider candidate rural roads and develop specific street improvement standards that preserve the rural character of these streets. Rural roads would typically feature natural landscaping, no sidewalks and narrow unpaved shoulders. GOAL M-2 PROMOTE IMPROVEMENTS TO CITY STREETS THAT SAFELY ACCOMMODATE ALL TRANSPORTATION MODES AND PERSONS OF ALL ABILITIES 241 M-18 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Strategy M-2.2.2: Semi-Rural Road Improvement Standards. Consider candidate semi-rural roads where curb and gutter improvements, and no sidewalks, are appropriate. Strategy M-2.2.3: Urban Road Improvement Standards. Develop urban improvement standards for arterials such as Stevens Creek and De Anza Boulevards. In these areas, standards may include wide sidewalks, tree wells, seating, bike racks and appropriate street furniture. Policy M-2.3: Connectivity Promote pedestrian and bicycle improvements that improve connectivity between planning areas, neighborhoods and services, and foster a sense of community. Policy M-2.4: Community Impacts Reduce traffic impacts and support alternative modes of transportation in neighborhoods and around schools, parks and community facilities rather than constructing barriers to mobility. Do not close streets unless there is a demon- strated safety or over-whelming through traffic problem and there are no acceptable alternatives since street closures move the problem from one street to another. Policy M-2.5: Public Accessibility Ensure all new public and private streets are publicly acces- sible to improve walkability and reduce impacts on existing streets. 242 M-19 CHAPTER 5 Mobility Element REVISED PUBLIC DRAFT Walkability and Bikeability Walkability and bikeability policies encourage a livable, healthy, sustainable and connected city with a safe and comfortable pedestrian network among its various neigh- borhoods, parks, trails, employment centers, community facilities, neighborhood centers and commercial centers. Policy M-3.1: Bicycle and Pedestrian Master Plan Adopt and maintain a Bicycle and Pedestrian master plan, which outlines policies and improvements to streets, exten- sion of trails, and pathways to create a safe way for people of all ages to bike and walk on a daily basis, and as shown in Figure M-1. Policy M-3.2: Development Require new development and redevelopment to increase connectivity through direct and safe pedestrian connections to public amenities, neighborhoods, shopping and employ- ment destinations throughout the city. Policy M-3.3: Pedestrian and Bicycle Crossings Enhance pedestrian and bicycle crossings and pathways at key locations across physical barriers such as creeks, high- ways and road barriers. Policy M-3.4: Street Widths Preserve and enhance citywide pedestrian and bike connec- tivity by limiting street widening purely for automobiles as a means of improving traffic flow. GOAL M-3 SUPPORT A SAFE PEDESTRIAN AND BICYCLE STREET NETWORK FOR PEOPLE OF ALL AGES AND ABILITIES 243 M-20 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Policy M-3.5: Curb Cuts Minimize the number and the width of driveway openings. Strategy M-3.5.1: Shared Driveway Access. Encourage property owners to use shared driveway access and inter- connected roads within blocks, where feasible. Require driveway access closures, consolidations or both when a site is remodeled or redeveloped. Strategy M-3.5.2: Direct Access from Secondary Streets. Encourage property with frontages on major and second- ary streets to provide direct access to driveways from the secondary street. Policy M-3.6: Safe Spaces for Pedestrians Require parking lots to include clearly defined paths for pedestrians to provide a safe path to building entrances. Policy M-3.7: Capital Improvement Program Plan for improvements to pedestrian and bicycle facilities and eliminate gaps along the network pedestrian and bicycle as part of the City’s Capital Improvement Program. Policy M-3.8: Bicycle Parking Require new development to provide public and private bicycle parking. Policy M-3.9: Outreach Actively engage the community in promoting walking and bicycling through education, encouragement and outreach on improvement projects and programs. Policy M-3.10: Quarry Operations Continue enforcement of truck traffic speeds from Stevens Creek and the Lehigh Cement Plant on Stevens Canyon Road, and Stevens Creek and Foothill Boulevards. 244 M-21 CHAPTER 5 Mobility Element REVISED PUBLIC DRAFT Transit Transit policies encourage planning and coordination of regional and local transit services, both public and private, to accommodate diverse community needs and to make transit a safe, comfortable and efficient option. Policy M-4.1: Transit Agencies Coordinate with VTA and to improve transportation service, infrastructure and access in the city, and to connect to transportation facilities such as Caltrain and VTA light rail stations. Policy M-4.2: Local Transportation Services Create or partner with transit providers, employers, educational institutions, and major commercial entities to minimize gaps within local transportation services. Policy M-4.3: Connecting Major Special Areas Identify and implement new or enhanced transit services to connect major Special Areas including De Anza College, North Vallco Park, North De Anza, South Vallco Park, Crossroads, City Center and Civic Center. Policy M-4.4: Transit Facilities with New Development Work with VTA and/or major developments to ensure all new development projects include amenities to support GOAL M-4 PROMOTE LOCAL AND REGIONAL TRANSIT THAT IS EFFICIENT, FREQUENT AND CONVENIENT AND REDUCES TRAFFIC IMPACTS 245 M-22 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT public transit including bus stop shelters, space for transit vehicles as appropriate and attractive amenities such as trash receptacles, seating and lighting. Policy M-4.5: Access to Transit Services Support right-of-way design and amenities consistent with local transit goals to improve transit as a viable alternative to driving. Policy M-4.6: Bus and Shuttle Programs Work with large regional employers and private commuter bus/shuttle programs to provide safe pick-up, drop-off, and park and rides in order to reduce single occupancy vehicle trips. Safe Routes to Schools Safe routes to schools policies protect the safety of school children and promote health, environmental sustainability and social interaction. They leverage local, regional and national Safe Routes to Schools Program resources to sup- port increased walking and bicycling to schools. 246 M-23 CHAPTER 5 Mobility Element REVISED PUBLIC DRAFT Policy M-5.1: Safe Routes to Schools Promote Safe Routes to Schools programs for all schools serving the city. Strategy M-5.1.1. Coordination with School Districts. Coordinate with the School Districts to develop plans and programs that encourage car/van-pooling, stagger hours of adjacent schools, establish drop-off locations, and encour- age walking and bicycling to school. Strategy M-5.1.2. Teen Commission. Encourage the Teen Commission to work with schools to encourage year-round programs to incentivize walking and biking to school. Policy M-5.2: Prioritizing Projects Ensure that bicycle and pedestrian safety improvements include projects to enhance safe accessibility to schools. Policy M-5.3: Connections to Trails Connect schools to the citywide trail system. Policy M-5.4: Education Support education programs that promote safe walking and bicycling to schools. GOAL M-5 ENSURE SAFE AND EFFICIENT PEDESTRIAN AND BICYCLE ACCESS TO SCHOOLS WHILE WORKING TO REDUCE SCHOOL-RELATED CONGESTION 247 M-24 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Vehicle Parking Vehicle parking policies encourage efficient and adequate parking, avoid negative effects on the pedestrian environ- ment or surrounding neighborhoods, and support the City’s goals for Complete Streets, walkability, bikeability and effective transit. Policy M-6.1: Parking Codes Maintain efficient and updated parking standards to ensure that development provides adequate parking, both on-street and off-street depending on the characteristics of the development, while also reducing reliance on the automobile. Policy M-6.2: Off-Street Parking Ensure new off-street parking is properly designed and efficiently used. GOAL M-6 PROMOTE INNOVATIVE STRATEGIES TO PROVIDE EFFICIENT AND ADEQUATE VEHICLE PARKING 248 M-25 CHAPTER 5 Mobility Element REVISED PUBLIC DRAFT Transportation Impact Analysis Transportation Impact Analysis policies enable effective, informed transportation planning by using a more balanced system of indicators, data and monitoring to evaluate the city’s multi-modal transportation system and optimize travel by all transportation modes. Policy M-7.1: Multi-Modal Transportation Impact Analysis Follow guidelines set by the VTA related to transportation impact analyses, while conforming to State goals for multi- modal performance targets. Policy M-7.2: Protected Intersections Consider adopting a Protected Intersection policy which would identify intersections where improvements would not be considered which would degrade levels of service for non-vehicular modes of transportation. Potential locations include intersections in Priority Development Areas (PDAs) and other areas where non-vehicular transportation is a key consideration. GOAL M-7 REVIEW AND UPDATE TIA POLICIES AND GUIDELINES THAT ALLOW FOR ADEQUATE CONSIDERATION FOR ALL MODES OF TRANSPORTATION INCLUDING AUTOMOBILES, WALKING, BICYCLING AND TRANSIT 249 M-26 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Greenhouse Gas Emissions and Air Quality Greenhouse gas emissions and air quality policies in this Element work in tandem with other General Plan policies to reduce municipal and community-wide greenhouse gas emissions and improve air quality throughout Cupertino. Policy M-8.1: Greenhouse Gas Emissions Promote transportation policies that help to reduce green- house gas emissions. Policy M-8.2: Land Use Support development and transportation improvements that help reduce greenhouse gas emissions by reducing per capita Vehicle Miles Traveled (VMT). Policy M-8.3: Transportation System Management (TSM) Programs Employ TSM strategies to improve efficiency of the trans- portation infrastructure including strategic right-of-way improvements, intelligent transportation systems and opti- mization of signal timing to coordinate traffic flow. GOAL M-8 PROMOTE POLICIES TO HELP ACHIEVE STATE, REGIONAL AND LOCAL AIR QUALITY AND GREENHOUSE GAS EMISSION REDUCTION TARGETS 250 M-27 CHAPTER 5 Mobility Element REVISED PUBLIC DRAFT Policy M-8.4: Transportation Demand Management (TDM) Programs Require large employers to develop and maintain TDM pro- grams to reduce vehicle trips generated by their employees and develop a tracking method to monitor results. Policy M-8.5: Design of New Developments Encourage new commercial developments to provide shared office facilities, cafeterias, daycare facilities, lunch- rooms, showers, bicycle parking, home offices, shuttle buses to transit facilities and other amenities that encour- age the use of transit, bicycling or walking as commute modes to work. Provide pedestrian pathways and orient buildings to the street to encourage pedestrian activity. Policy M-8.6: Alternative Fuel Charging Stations Develop a city-wide strategy to encourage the construction of a network of public and private alternative fuel vehicle charging/fueling stations. 251 M-28 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Roadway System Efficiency Roadway system efficiency policies make effective use of roadway capacity by encouraging strategic roadway improvements and complementary policies promoting tran- sit, walking, bicycling and complete streets. Policy M-9.1: Efficient Automobile Infrastructure Strive to maximize the efficiency of existing infrastructure by locating appropriate land uses along roadways and retrofit- ting streets to be accessible for all modes of transportation. Policy M-9.2: Reduced Travel Demand Synchronization of Traffic Signals. Enhance the synchroniza- tion of traffic signals on major streets to improve traffic flow and reduce congestion. Policy M-9.3: Street Width Except as required by environmental review for new devel- opments, limit widening of streets as a means of improving traffic efficiency and focus instead on operational improve- ments to preserve community character. Strategy M-9.3.1. Wolfe Road Overcrossing. Consider alternate designs for the Wolfe Road/I-280 Interchange (e.g., from partial cloverleaf design to diamond design) when evaluating the need to widen the freeway overcrossing. GOAL M-9 PROMOTE EFFECTIVE AND EFFICIENT USE OF THE CITY’S TRANSPORTATION NETWORK AND SERVICES 252 M-29 CHAPTER 5 Mobility Element REVISED PUBLIC DRAFT Strategy M-9.3.2. Streetscape Design. When reviewing the widening of an existing street, consider the aesthetic vision of the Planning Area and incorporate to the extent feasible appropriate landscaping and pedestrian/bicycle amenities. Transportation Infrastructure Transportation infrastructure policies promote safe, attrac- tive and well-maintained facilities for walking, bicycling, transit and automobiles. Policy M-10.1: Transportation Improvement Plan Develop and implement an updated citywide transportation improvement plan necessary to accommodate vehicular, pedestrian and bicycle transportation improvements to meet the City’s needs. Policy M-10.2: Transportation Impact Fee Ensure sustainable funding levels for the Transportation Improvement Plan by enacting a transportation impact fee for new development. GOAL M-10 ENSURE THAT THE CITY’S TRANSPORTATION INFRASTRUCTURE IS WELL-MAINTAINED FOR ALL MODES OF TRANSPORTATION AND THAT PROJECTS ARE PRIORITIZED ON THEIR ABILITY TO MEET THE CITY’S MOBILITY GOALS 253 M-30 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Policy M-10.3: Multi-Modal Improvements Integrate the financing, design and construction of pedestrian and bicycle facilities with street projects. Build pedestrian and bicycle improvements at the same time as improvements for vehicular circulation. Policy M-10.4: Roadway Maintenance Funding Identify and secure new funding sources to fund the on- going routine maintenance of roadways. 254 SECTION 6 Environmental Resources SECTION 5 Environmental Resources ENVIRONMENTAL RESOURCES AND SUSTAINABILITY ELEMENT Chapter 6 255 REVISED PUBLIC DRAFT ES-2 256 ES-3 CHAPTER 6 Environmental Resources and Sustainability Element REVISED PUBLIC DRAFT CONTENTS ES-3 Introduction ES-4 Context Climate Change Air Quality Energy Buildings Natural Resources Mineral Resources Water ES-11 Looking Forward ES-14 Goals and Policies Planning and Regional Coordination Energy Sustainability Sustainable Buildings Air Quality Urban and Rural Ecosystems Mineral Resources Water INTRODUCTION Cupertino’s long-term environmental, economic and social prosperity depends on ensuring that land use planning and development recognizes the link between the built and natural environments. Today, more than half the planet’s population live in either a city or suburb, and it is projected that by 2050 more than 80 percent of all people will live within urban areas. Water and other natural resources that support cities originates in natural areas, which have become places of vast resource extraction to feed the needs of a growing human population. As a result, once “untouched” and pristine ecological systems have become strained by the enormous impact of human activity. To support these growing urban and suburban populations, while seeking to mitigate their continued demands on our landscape, cities need to identify and systemically prioritize ways because human activity has such a large impact on the environment, cities need to identify ways to protect and restore natural ecosystems through land use decisions, building designs and resource conservation. This entails that community guardians and planners apply the princi- pals of sustainability, only achieved by embedding social equity, economic and the environmental considerations throughout the development process, including mobility, infrastructure, water and energy use, buildings, streetscape and landscape, and land use planning. This Element includes goals, policies and strategies that help Cupertino think more holistically about sustainability, and in doing so, improve the ecological health and the quality of life for the community. 257 ES-4 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT CONTEXT Climate Change In 2006, the California Legislature and Governor took sig- nificant steps to address climate change concerns with the passage of the Global Warming Solutions Act (AB 32). The law set a target to reduce California’s greenhouse gas emis- sions to 1990 levels by year 2020. In addition, the Governor also signed Executive Order S-3-05 that required California to reduce greenhouse gas emissions (GHG) by 80 percent below the 1990 levels by year 2050. Many initiatives at the State, regional and local levels are being implemented to help achieve these goals. These include: • The Sustainable Communities and Climate Protection Act of 2008 (SB 375) supports the State’s climate action goals to reduce GHG emissions through coor- dinated transportation and land use planning. Each of California’s Metropolitan Planning Organizations must prepare a Sustainable Communities Strategy (SCS) as an integral part of its Regional Transportation Plan (RTP) to achieve these targets. For the nine-county Bay Area, the Association of Bay Area Governments (ABAG) and the Metropolitan Transportation Commission (MTC) have prepared the One Bay Area Plan as its SCS. This plan contains land use, housing and transportation strategies that allow the region to meet its GHG reduction targets. • The One Bay Area Grant (OBAG) program, which imple- ments transportation funding in coordination with the strategies in the One Bay Area Plan. • The City is in the process of completing its Climate Action Plan (CAP), which aims to address GHG reduc- tions per the targets set in AB 32 and S-3-05. The CAP 258 ES-5 CHAPTER 6 Environmental Resources and Sustainability Element REVISED PUBLIC DRAFT is based on 2040 growth projections for Cupertino. It aims to capture the shortfall projected from State initia- tives by identifying policies and strategies to reduce GHG at a municipal and community-wide level. Air Quality Clean air is a basic need for human and environmental health. Air pollution comes from both mobile sources (e.g., cars, trucks, airplanes) and stationary sources (e.g., agricul- tural and industrial uses). Air quality standards are estab- lished by both the State Air Resources Board and the U.S. Environmental Protection Agency. The Bay Area Air Quality Management District (BAAQMD) has the responsibility to create strategies and monitor the targets set by State and Federal standards for the Bay Area. Due to air quality plan- ning efforts, regional air quality has improved significantly over the past several decades, even though the population, traffic and industrialization have increased. BAAQMD’s 2010 Clean Air Plan works in tandem with the One Bay Area Plan and identifies strategies to address four categories of pollutants including ground-level ozone, particulate matter, air toxics and GHG. The City’s CAP aims to capture the shortfall projected from State initiatives to reduce GHG at a municipal and community-wide level. While standards are a key component in improving air quality, the City’s approach towards land use, mobility, infra- structure and operations can have a huge impact. Energy Energy consumption in the United States and in Cupertino is mainly fossil-fuel based (e.g., coal, oil, natural gas, etc.). The continuously rising cost of energy production, together with diminishing non-renewable fossil fuels, has necessi- tated a change towards reduction and efficient use of fossil fuels, and identifying and increasing the use of alternative, renewable energy sources. 259 ES-6 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Energy providers are also looking to move their portfolio towards alternative energy sources including wind turbine, nuclear and solar generation. The diminishing cost of installing smaller solar power generation systems is encour- aging the increased use of such facilities by consumers. Additionally, strides in automobile technology utilizing elec- tric batteries and improvements to the network of charging stations allows users confidence in the use of electric cars. Finally, rising energy costs and Federal and State standards on energy usage are encouraging more people to replace existing appliances and other equipment with more energy efficient equipment. Cupertino has continued to express its commitment to con- serving energy by improving municipal operations in order to reduce energy use (e.g., retrofitting or replacing street equipment, vehicles and facilities), and providing resources and information to professionals, residents, businesses and schools to achieve energy and associated cost savings. Buildings The 2010 Greenhouse Gas Emissions Inventory for Cupertino indicates that buildings account for about 55 percent of GHG emissions in the city. This means that State and local efforts towards energy conservation in buildings can significantly affect the community’s air quality. While green building strategies can effectively target GHG, they also improve the health of occupants, preserve habitat and natural landscapes, reduce water pollution and conserve other natural resources. State and local efforts to encourage green buildings include the following: • The State routinely updates building code standards to include new energy conservation and green building concepts. The 2013 CalGreen Building Code outlines mandatory and voluntary measures to encourage sus- tainable practices in all aspects of construction such as planning and design; energy and water efficiency and 260 ES-7 CHAPTER 6 Environmental Resources and Sustainability Element REVISED PUBLIC DRAFT conservation; material conservation; resource efficiency; and environmental quality. • Cupertino has adopted a Green Building Ordinance that ensures that new buildings and renovations exceed the sustainability and ecological standards set by the State. Natural Resources Biodiversity Biodiversity refers to the diversity, or variety, of plants and animals in a particular ecosystem, area or region. Cupertino’s commitment to sustainability includes sustain- ing the diversity of species in each ecosystem as we plan for human activities that affect the use of land and natural resources. Cupertino’s ecosystem ranges from the urban environment in the flatlands to semi-rural and rural environ- ment in the western foothills of the Santa Cruz Mountains. The City has always recognized the importance of sustain- ing biodiversity in the foothills and along riparian corridors. However, a commitment to sustainability will require a different way of thinking about the urban ecosystem. The City has already preserved an 18-acre site and restored creek habitat right in the city to maintain biodiversity and ecological integrity of our local natural systems. The City is now looking at opportunities in the built and natural envi- ronment to sustain and enhance biodiversity. Urban Ecosystems While an urban environment can be stressful for some spe- cies due to pollution and habitat fragmentation, others may thrive in this environment because humans create favorable microhabitats or abundant resources for them. Modified habitats including greenhouses, basements, compost piles and green roofs can help certain plant and animal species thrive better than in natural environments. As Cupertino continues to change and grow, the City is committed to enhancing the urban ecosystem in the form of urban 261 ES-8 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT forestry management, integration of green infrastructure, treatment of parks and open space, landscape and building requirements. Rural Ecosystems Cupertino’s rural plant and animal resources are located in the relatively undeveloped western foothills and mountains, near the Rancho San Antonio Open Space Preserve and along Stevens Creek. Each ecosystem of vegetation pro- vides food and shelter to support a variety of wildlife. The diversity of plant and animal life supported in different eco- systems is identified in Table ES-1 below and Figure ES-1. TABLE ES-1 PLANT AND ANIMAL RESOURCES Ecosystem Location Plant Resources Animal Resources Riparian • Grows along stream courses • Valuable habitat for wildlife due to presence of water, lush vegetation and high insect populations • Stevens Creek • Permanente Creek • Regnart Creek • Heney Creek • Calabazas Creek • Willow • California Buckeye • Coast Live Oak • Coyote Brush • Poison Oak • California blackberry Relatively undisturbed riparian areas support a wide variety of wildlife species including: • Amphibians • Reptiles • Birds • Mammals Grasslands • Composed primarily of non-native grasses • Formerly used as pasture • Occur on lower slopes of western foothills • Scattered locations on higher elevations in Montebello Ridge system • Wild oat • Clover • Rye grass • Vetch • Spring wild flower bloom (such as California Poppy, Plantago or Owl Clover) Reptilian and mammal species adapted to dry conditions includ- ing: • Western Fence Lizard • Western Rattlesnake • Common King Snake • Burrowing rodents (such as Meadow mice or California ground squirrel Brushlands • Scrubby, dense vegetation that often integrates with Woodlands • Found on dry, rocky and steep slopes • Coyote brush • Poison oak • California sage • Ceanothus • Mule deer • Brush rabbit • Bobcat • Coyote Foothill Woodlands and Forests • Scattered Oak trees with an undergrowth in some areas of plants • Large trees • Foothills • Higher elevations • Oak trees • Mixed Hardwood trees • Evergreens including redwoods • Insect/seed eating birds and mammals • Raptors, including owls • Large mammals including deer, coyote 262 ES-9 CHAPTER 6 Environmental Resources and Sustainability Element REVISED PUBLIC DRAFT Figure ES-1 Vegetation S anta Cr u z C ounty S anta C l a raCou nt y Riparian Intermitant RiparianWet Soil Grassland Riparian Flowing RiparianFlowing Grassland Foothill Woodland Quarry Quarry Grass-land Riparian Intermitant Deciduous Forest Foothill Woodland Deciduous Forest / Chaparral Grassland Grassland RiparianPermanent Mixed Evergreen Forest Chaparral Coniferous Forest Grassland Quarry Riparian Intermitant F O O T H I L L B L V D ST E L L I N G R D De A N Z A B L V D HOMESTEAD ROAD WO L F E R D STEVENS CREEK BLVD BL A N E Y A V E MI L L E R A V E BOLLINGER RD McCLELLAN ROAD RAINBOW DRIVE BU B B R O A D PROSPECT RD 85 280 TANTA Stevens Creek Reservoir Sunnyvale Santa Clara San Jose Saratoga Los Altos 01000 0500 20003000 0 0.5 1Mile 1000 Feet Meters Legend City Boundary Urban Forest Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas N 263 ES-10 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Mineral Resources The State of California, recognizing the value of preserv- ing mineral deposits to achieve a more sustainable future, enacted the Surface Mining and Reclamation Act (SMARA) in 1975. The objective of SMARA is to assist local govern- ments in conserving mineral deposits for future use. There are several mineral resource areas located both in Cupertino’s sphere of influence and within the city limit. These mineral resource areas are shown in Figure ES-2. The figure identifies natural resource areas that will be conserved for future extraction, which are outside of the city limits. Two quarries within the city’s sphere of influence, Hanson Permanente and Stevens Creek, have been designated by the State as having mineral deposits of regional or state significance. These quarries are located in the unincorpo- rated area outside city limits, and therefore, Santa Clara County has regulatory jurisdiction. The County’s mineral resource policies are directed toward preserving existing resource areas and, where feasible, designating new areas and expanding existing sites. The McDonald-Dorsa quarry, which used to operate south of the Deep Cliff Golf Course and Linda Vista Park, was closed in the 1970s and is not a current source of minerals. The site has since been designated as residential, while the portion that is now Linda Vista Park is designated for parks and open space. However, since it was closed prior to SMARA, redevelopment in the area should address soils stabilization and reclamation issues. Water Cupertino’s sustainable future is, in part, dependent upon the supply and use of water as well as the effective management of natural watershed resources. In recent 264 ES-11 CHAPTER 6 Environmental Resources and Sustainability Element REVISED PUBLIC DRAFT Figure ES-2 Mineral Resources FO O T H I L L B L V D ST E L L I N G R D De A N Z A B L V D HOMESTEAD ROAD WO L F E R D STEVENS CREEK BLVD BL A N E Y A V E MI L L E R A V E BOLLINGER RD McCLELLAN ROAD RAINBOW DRIVE BU B B R O A D PROSPECT ROAD 85 280 TANTAU AVE Stevens Creek Reservoir Sunnyvale Santa Clara San Jose Saratoga Mineral Resource Areas Urban / Low Density Hillside BoundarySource: State of California Resources Agency. Department of Conservation. Los Altos MRZ-2 Areas where adequate information indicates that significant mineral deposits are present, or where it is judged that a high likelihood for their presence exists. MRZ-3 Areas containing mineral deposits the significance of which cannot be evaluated from available data. 2 3 Urban / Suburban Developed - Unsuitable for Extraction Low Density Hillside - Incompatible with Extraction Unincorporated Area Outside the Urban Service Area is Appropriate for Conservation and Future Extraction 3 3 2 3 3 Depleted2 01000 0500 20003000 0 0.5 1Mile 1000 Feet Meters Legend City Boundary Heart of the City Boundary Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas N 265 ES-12 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT years, water resource management has moved away from supply side efforts (e.g., creation of dams and reservoirs) to managing how water is used. In particular, this includes emphasizing conservation, stormwater treatment and effi- ciency in infrastructure planning, design and construction of buildings, and land use planning. The following is a list of existing State, regional and local efforts towards water conservation. • The Santa Clara Valley Water District is the groundwater management agency in Santa Clara County. The Santa Clara Valley Groundwater sub-basin provides approxi- mately half of the total county water demands. The District works to maximize water supply, protect the basins from contamination and ensure that groundwater supply is sustained. • The San Francisco Bay Regional Water Quality Board (RWQWB) implements the Clean Water Act for the Bay Area region including the National Pollutant Discharge Elimination System (NPDES) Municipal Storm Water permit which regulates both point source and non-point source pollutants to improve ground water resources and reduce pollution in the bay. This program is dis- cussed in detail in the Infrastructure Element. • Senate Bill X7-7 was enacted in November 2009, requir- ing all water suppliers to increase water use efficiency and sets a goal of reducing per capita urban water use by 20 percent by 2020. The bill includes a short-term target of a 10 percent reduction in per capita urban water use by 2015. • The City of Cupertino has adopted a Water Efficient Landscape Ordinance and Green Building Ordinance to ensure that the city can meet and State and regional targets. 266 ES-13 CHAPTER 6 Environmental Resources and Sustainability Element REVISED PUBLIC DRAFT LOOKING FORWARD Future growth and change in Cupertino provides both a challenge and an opportunity for the City and community. Cupertino is blessed with an abundance of natural and urban ecosystems. In the past, the City has relied on a limited toolkit of policies to ensure that growth and development do not negatively impact natural resources. Great strides have been made in the last decade to promote sustainability, and community support for these initiatives has been growing. In response, the City has created a suite of services and policies, to ensure our community’s growth and achievement of its development potential enhances, not hinders, natural resources and bolsters, not impacts, human health. The City now has a much larger array of resources to manage growth, including sustainability practices, new planning and development tools, and performance measures to maintain or enhance natural resources and overall environmental health. 1. Regional Cooperation. Federal, State and regional agencies have been at the forefront of legislation related to sustainability and environmental health. The City should strive to exceed these requirements in areas that are of priority to the community and strengthen regional partnerships to bring in resources for implementing new policies and programs. 2. Ecosystems. In recent years, cities have begun to realize that urban and suburban areas can provide habitat for many plant and animal species. The City will focus policies on a citywide approach (urban and natural environments) towards sustaining and improving urban and suburban ecosystems 3. Sustainability Best Practices. The City will use sustainability principles, striving always to balance social equity with economic and environmental health, when 267 ES-14 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT evaluating all aspects of new development; mobility and infrastructure improvements; building design and operation; streetscapes and landscaping; and citywide land use planning. 4. Community Involvement. The City will encourage community participation in the planning and implementation of sustainability-related programs. GOALS AND POLICIES Planning and Regional Coordination The City seeks to coordinate its local sustainability and greenhouse gas reduction planning efforts with Federal, State and regional plans and programs to ensure a con- sistent, integrated and efficient approach to a sustainable future. Policy ES-1.1: Principles of Sustainability Incorporate the principles of sustainability into Cupertino’s planning, infrastructure and development process in order to improve the environment, reduce greenhouse gas emissions and meet the needs of the community without compromising the needs of future generations. Strategy ES-1.1.1: Climate Action Plan (CAP). Adopt, implement and maintain a Climate Action Plan to attain greenhouse gas emission targets consistent with state law and regional requirements. This qualified greenhouse gas emissions reduction plan, by BAAQMD’s definition, will allow for future project CEQA streamlining and will identify measures to: GOAL ES-1 ENSURE A SUSTAINABLE FUTURE FOR THE CITY OF CUPERTINO 268 ES-15 CHAPTER 6 Environmental Resources and Sustainability Element REVISED PUBLIC DRAFT • Reduce energy use through conservation and efficiency; • Reduce fossil fuel use through multi-modal and alterna- tive transportation; • Maximize use of and, where feasible, install renewable energy resources; • Increase citywide water conservation and recycled water use; • Accelerate Resource Recovery through expanded recy- cling, composting, extended producer responsibility and procurement practices; and • Promote and incentivize each of those efforts to maxi- mize community participation and impacts; • Integrate multiple benefits of green infrastructure with climate resiliency and adaptation. Strategy ES-1.1.2: CAP and Sustainability Strategies Implementation. Periodically review and report on the effectiveness of the measures outlined in the CAP and the strategies in this Element. Institutionalize sustainability by developing a methodology to ensure all environmental, social and lifecycle costs are considered in project, pro- gram, policy and budget decisions. Strategy ES-1.1.3: Climate Adaptation and Resiliency. Conduct a climate vulnerability assessment and set preparedness goals and strategies to safeguard human health and community assets susceptible to the impacts of a changing climate (i.e. increased drought, wildfires, flooding). Incorporate these critical forecasting tools and directives into all relevant Incorporate these into all relevant plans, including the Emergency Preparedness Plan, Local Hazard Mitigation Plan, Dam Failure Plan, Climate Action Plan, Watershed Protection Plan, and Energy Assuredness Plan. 269 ES-16 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Policy ES-1.2: Regional Growth and Transportation Coordination Coordinate with local and regional agencies to prepare updates to regional growth plans and strategies, including the Regional Housing Allocation Needs Allocation (RHNA), One Bay Area Plan, Regional Transportation Plan (RTP) and Sustainable Communities Strategy (SCS). Strategy ES-1.2.1: Local Plan Consistency with Regional Plans. Update and maintain local plans and strategies so they are consistent with One Bay Area Plan to qualify for State transportation and project CEQA streamlining. Energy Sustainability Since energy consumption is the largest contributor to GHG emissions, the City seeks to conserve energy to reach state and regional emissions targets. Policy ES-2.1: Conservation and Efficient Use of Energy Resources Encourage the maximum feasible conservation and efficient use of electrical power and natural gas resources for new and existing residences, businesses, industrial and public uses. Strategy ES-2.1.1: Coordination. Continue to evaluate, and revise as necessary, applicable City plans, codes and procedures for inclusion of Federal, State and regional requirements and conservation targets. Strategy ES-2.1.2: Comprehensive Energy Management. Prepare and implement a comprehensive energy GOAL ES-2 PROMOTE CONSERVATION OF ENERGY RESOURCES 270 ES-17 CHAPTER 6 Environmental Resources and Sustainability Element REVISED PUBLIC DRAFT management plan for all applicable municipal facilities and equipment to achieve the energy goals established in the City’s Climate Action Plan. Track the City’s energy use and report findings as part of the Climate Action Plan reporting schedule. Embed this plan into the City’s Environmentally Preferable Procurement Policy to ensure measures are achieved through all future procurement and construction practices. Strategy ES-2.1.3: Energy Efficient Replacements. Continue to use life cycle cost analysis to identify City assets for replacement with more energy efficient technol- ogy. Utilize available tools to benchmark and showcase city energy efficiency achievements (i.e. EPA Portfolio Manager, statewide Green Business Program). Strategy ES-2.1.4: Incentive Program. Consider incentive programs for projects that exceed mandatory requirements and promote incentives from state, county and federal gov- ernments for improving energy efficiency and expanding renewable energy installations. Strategy ES-2.1.5: Urban Forest. Encourage the inclusion of additional shade trees, vegetated stormwater treatment and landscaping to reduce the “heat island effect” in devel- opment projects. Strategy ES-2.1.6: Alternate Energy Sources. Promote and increase the use of alternate and renewable energy resources for the entire community through effective poli- cies, programs and incentives. Strategy ES-2.1.7: Energy Cogeneration Systems. Encourage the use of energy cogeneration systems through the provision of an awareness program targeting the larger commercial and industrial users and public facilities. 271 ES-18 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Strategy ES-2.1.8: Energy Audits and Financing. Continue to offer and leverage regional partners’ programs to conduct energy audits and/or subvention programs for homes, commercial, industrial and city facilities, and recom- mend improvements that lead to energy and cost savings opportunities for participants and encourage adoption of alternative energy technologies. Encourage energy audits to include emerging online and application-based energy analytics and diagnostic tools. Share residential and com- mercial energy efficiency and renewable energy financing tools through outreach events and civic media assets. Strategy ES-2.1.9: Energy Efficient Transportation Modes. Continue to encourage fuel-efficient transportation modes such as alternative fuel vehicles, driverless vehicles, public transit, car and van-pooling, community and regional shuttle systems, car and bike sharing programs, safe routes to schools, commuter benefits, and pedestrian and bicycle paths through infrastructure investment, development incentives, and community education. Strategy ES-2.1.10: Community Choice Energy. Collaborate with regional partners to evaluate feasibility for development of a Community Choice Energy. Sustainable Buildings The City seeks to improve building efficiency from planning, construction and operations to help improve indoor air quality and conserve materials and natural resources. GOAL ES-3 IMPROVE BUILDING EFFICIENCY 272 ES-19 CHAPTER 6 Environmental Resources and Sustainability Element REVISED PUBLIC DRAFT Policy ES -3.1: Green Building Design Set standards for the design and construction of energy and resource conserving/efficient building. Strategy ES-3.1.1: Green Building Program. Periodically review and revise the City’s Green Building ordinance to ensure alignment with CALGreen requirements for all major private and public projects that ensure reduction in energy and water use for new development through site selection and building design. Strategy ES-3.1.2: Staff Training. Continue to train appro- priate City staff in the design principles, costs and benefits of sustainable building and landscape design. Encourage City staff to attend external trainings on these topics and attain relevant program certifications (e.g., Green Point Rater, LEED Accredited Professional). Strategy ES-3.1.3: Green Buildings Informational Seminars. Conduct and/or participate in Green Building informational seminars and workshops for members of the design and construction industry, land development, real estate sales, lending institutions, landscaping and design, the building maintenance industry and prospective project applicants. Strategy ES-3.1.4: Green Building Demonstration. Pursue municipal facility retrofits, through a Green Capital Improvement Program (CIP), and new construction projects that exceed CalGreen and achieve third-party certification criteria (i.e. LEED, Living Building Challenge, Zero Net Energy) as a means of creating demonstration spaces for developer and community enrichment. 273 ES-20 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Air Quality The City seeks to identify ways to improve air quality in order to reduce emissions and improve overall community health. Policy ES-4.1: New Development Minimize the air quality impacts of new development proj- ects and air quality impacts that affect new development. Strategy ES-4.1.1: Toxic Air Contaminants. Continue to review projects for potential generation of toxic air contami- nants at the time of approval and confer with Bay Area Air Quality Management District on controls needed if impacts are uncertain. Strategy ES-4.1.2: Dust Control. Continue to require water application to non-polluting dust control measures during demolition and the duration of the construction period. Strategy ES-4.1.3: Planning. Ensure that land use and transportation plans support air quality goals. Policy ES-4.2: Existing Development Minimize the air quality impacts of existing development. Strategy ES-4.2.1: Public Education Program. Establish a citywide public education program providing information on ways to reduce and control emissions; and continue to provide information about alternative commutes, carpool- ing and restricting exacerbating activities on “Spare the Air” high-emissions days. GOAL ES-4 MAINTAIN HEALTHY AIR QUALITY LEVELS 274 ES-21 CHAPTER 6 Environmental Resources and Sustainability Element REVISED PUBLIC DRAFT Strategy ES-4.2.2: Home Occupations. Review and consider expanding the allowable home occupations in resi- dentially zoned properties to reduce the need to commute to work. Strategy ES-4.2.3: Urban Forest. Review and enhance the City’s tree planting and landscaping program and require- ments for private development to reduce air pollution levels. Strategy ES-4.2.4: Fuel-efficient Vehicles and Use. Prioritize the purchase, replacement and ongoing use of fuel-efficient and low polluting City fleet vehicles. Update applicable policies and programs to require life cycle cost analyses and include alternative fueling infrastructure review and related funding allocations. Update the Vehicle Use Policy and pursue fleet management best practices to sup- port fuel conservation, scheduled maintenance and fleet fuel tracking. Pursue available grant funding to offset the cost of implementing these programs. Strategy ES-4.2.5: Point Sources of Emissions. Continue to seek the cooperation of the BAAQMD to monitor emissions from identified point sources that impact the community. In addition, for sources not within the regula- tory jurisdiction of the City, seek cooperation from the applicable regulatory authority to encourage reduction of emissions and dust from the point source. Policy ES-4.3: Use of Open Fires and Fireplaces Discourage high pollution fireplace use. Strategy ES-4.3.1: Education. Continue to make BAAQMD literature on reducing pollution from fireplace use available. Strategy ES-4.3.2: Fireplaces. Continue to prohibit new wood-burning fireplaces, except EPA certified wood stoves as allowed by the Building Code. 275 ES-22 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Urban and Rural Ecosystems Protecting Cupertino’s natural and urban ecosystems sup- ports the City commitment to protect ecosystems and improve sustainability. Policy ES-5.1: Urban Ecosystem Manage the public and private development to ensure the protection and enhancement of its urban ecosystem. Strategy ES-5.1.1: Urban Forest. Ensure that the City’s tree planting, landscaping and open space policies enhance the urban ecosystem by encouraging medians, pedestrian- crossing curb-extensions planting that is native, drought- tolerant, treats stormwater and enhances urban plant, aquatic and animal resources. Strategy ES-5.1.2: Built Environment. Ensure that sustain- able landscaping design is incorporated in the develop- ment of City facilities, parks and private projects with the inclusion of measures such as tree protection, stormwater treatment and planting of native, drought tolerant landscap- ing that is beneficial to the environment. Policy ES-5.2: Development near Sensitive Areas Encourage the clustering of new development away from sensitive areas such as riparian corridors, wildlife habitat and corridors, public open space preserves and ridgelines. New developments in these areas must have a harmonious landscaping plan approved prior to development. GOAL ES-5 PROTECT THE CITY’S URBAN AND RURAL ECOSYSTEMS 276 ES-23 CHAPTER 6 Environmental Resources and Sustainability Element REVISED PUBLIC DRAFT Strategy ES-5.2.1: Riparian Corridor Protection. Require the protection of riparian corridors through the develop- ment approval process. Policy ES-5.3: Landscaping in and near Natural Vegetation Preserve and enhance existing natural vegetation, land- scape features and open space when new development is proposed within existing natural areas. When develop- ment is proposed near natural vegetation, encourage the landscaping to be consistent with the palate of vegetation found in the natural vegetation. Strategy ES-5.3.1: Native Plants. Continue to emphasize the planting of native, drought tolerant, pest resistant, non-invasive, climate appropriate plants and ground covers, particularly for erosion control and to prevent disturbance of the natural terrain Strategy ES-5.3.2: Hillsides. Minimize lawn area in the hillsides. Policy ES-5.4: Hillside Wildlife Migration Confine fencing on hillside property to the area around a building, rather than around an entire site, to allow for migration of wild animals. Policy ES-5.5: Recreation and Natural Vegetation Limit recreation in natural areas to activities compatible with preserving natural vegetation, such as hiking, horseback riding, mountain biking and camping. 277 ES-24 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Policy ES-5.6: Recreation and Wildlife Provide open space linkages within and between properties for both recreational and wildlife activities, most specifically for the benefit of wildlife that is threatened, endangered or designated as species of special concern. Strategy ES-5.6.1: Creek and Water Course Identification. Require identification of creeks and water courses on site plans and require that they be protected from adjacent development. Strategy ES-5.6.2: Trail Easements. Consider requiring easements for trail linkages if analysis determines that they are needed. Mineral Resources The City seeks to minimize the impacts of mineral resource operations on the community. Policy ES-6.1: Mineral Resource Areas Cooperatively work with Santa Clara County to ensure that plans for restoration and mining operations at Lehigh Hanson and Stevens Creek quarries consider environmental impacts and mitigations. Strategy ES-6.1.1: Public Participation. Encourage the Santa Clara County to engage with the affected neighbor- hoods when considering changes to restoration plans and mineral extraction activity. Strategy ES-6.1.2: Recreation in Depleted Mining Areas. Consider designating abandoned quarries for passive recre- ation to enhance plant and wildlife habitat and rehabilitate the land. GOAL ES-6 MINIMIZE IMPACTS OF AVAILABLE MINERAL RESOURCES 278 ES-25 CHAPTER 6 Environmental Resources and Sustainability Element REVISED PUBLIC DRAFT Water The City seeks to ensure that current and future water supplies are adequate by reducing water demand and protecting sources of water. Policy ES-7.1: Natural Water Bodies and Drainage Systems In public and private development, use low impact development (LID) principles to mimic natural hydrology, minimize grading and protect or restore natural drainage systems. Strategy ES-7.1.1: Public and Private Development Plans. Continue to require topographical information; identifica- tion of creeks, streams and drainage areas; and grading plans with development proposals. Policy ES-7.2: Reduction of Impervious Surfaces Minimize stormwater runoff and erosion impacts resulting from development and use low impact development (LID) designs to treat stormwater or recharge groundwater Strategy ES-7.2.1: Lot Coverage. Consider updating lot coverage requirements to include paved surfaces such as driveways and on-grade impervious patios to incentivize the construction of pervious surfaces. Strategy ES-7.2.2: Pervious Walkways and Driveways. Encourage the use of pervious materials for walk- ways and driveways. If used on public or quasi-public GOAL ES-7 ENSURE PROTECTION AND EFFICIENT USE OF WATER RESOURCES 279 ES-26 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT property, mobility and access for the disabled should take precedence. Strategy ES-7.2.3: Maximize Infiltration. Minimize imper- vious surface areas, and maximize on-site filtration and the use of on-site retention facilities. Policy ES-7.3: Pollution and Flow Impacts Ensure that surface and groundwater quality impacts are reduced through development review and volunteer efforts. Strategy ES-7.3.1: Development Review. Require LID designs such as vegetated stormwater treatment systems and green infrastructure to mitigate pollutant loads and flows. Strategy ES-7.3.2: Creek Clean Up. Encourage volunteer organizations to help clean creek beds to reduce pollution and help return waterways to their natural state. Policy ES-7.4: Watershed Based Planning Review long-term plans and development projects to ensure good stewardship of watersheds. Strategy ES-7.4.1: Storm Drainage Master Plan. Develop and maintain a Storm Drainage Master Plan which identifies facilities needed to prevent “10-year” event street flood- ing and “100-year” event structure flooding and integrate green infrastructure to meet water quality protection needs in a cost effective manner. Strategy ES-7.4.2: Watershed Management Plans. Work with other agencies to develop broader Watershed Management Plans to model the City’s hydrology. Strategy ES-7.4.3: Development. Review development plans to ensure that projects are examined in the context of impacts on the entire watershed. 280 ES-27 CHAPTER 6 Environmental Resources and Sustainability Element REVISED PUBLIC DRAFT Policy ES-7.5: Groundwater Recharge Sites Support the Santa Clara Valley Water District efforts to find and develop groundwater recharge sites within Cupertino and provide public recreation where possible. Policy ES-7.6: Other Water Sources Encourage the research of other water sources, including water reclamation. Policy ES-7.7: Industrial Water Recycling Encourage industrial projects, in cooperation with the Cupertino Sanitary District, to have long-term conservation measures, including recycling equipment for manufacturing and water supplies in the plant. Policy ES-7.8: Natural Water Courses Retain and restore creek beds, riparian corridors, water- courses and associated vegetation in their natural state to protect wildlife habitat and recreation potential and assist in groundwater percolation. Encourage land acquisition or dedication of such areas. Strategy ES-7.8.1: Inter-Agency Coordination. Work with the Santa Clara Valley Water District and other relevant regional agencies to enhance riparian corridors and provide adequate flood control by use of flow increase mitigation measures. Policy ES-7.9: Inter-Agency Coordination for Water Conservation Continue to coordinate citywide water conservation and regional water supply problem solving efforts with the Santa Clara Valley Water District (SCVWD), San Jose Water Company and California Water Company. 281 ES-28 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Strategy ES-7.9.1: Water Conservation Measures. Implement the mandatory water conservation measures and encourage the implementation of voluntary water conserva- tion measures from the City’s water retailers and SCVWD, in times of drought. Policy ES-7.10: Public Education Regarding Resource Conservation Provide public information regarding resource conservation. Strategy ES-7.10.1: Outreach. Continue to send edu- cational information and notices to households and businesses with water prohibitions, water allocations and conservation tips. Continue to offer featured articles in the Cupertino Scene and Cupertino Courier. Consider providing Public Service Announcements on the City’s Channel and Cupertino Radio. Strategy ES-7.10.2: Demonstration Gardens. Consider including water-wise demonstration gardens in some parks where feasible as they are re-landscaped or improved using drought tolerant native and non-invasive, and non-native plants. Policy ES-7.11: Water Conservation and Demand Reduction Measures Promote efficient use of water throughout the City in order to meet State and regional water use reduction targets. Strategy ES-7.11.1: Urban Water Management Plan. Collaborate with water retailers serving the City in the preparation of their Urban Water Management Plan, includ- ing water conservation strategies and programs. Strategy ES-7.11.2: Water Conservation Standards. Comply with State water conservation standards by either adopting the State standards or alternate standards that are equally efficient. 282 ES-29 CHAPTER 6 Environmental Resources and Sustainability Element REVISED PUBLIC DRAFT Strategy ES-7.11.3: Recycled Water System. Continue to work with water retailers to promote and expand the avail- ability of recycled water in the City for public and private use. Strategy ES-7.11.4: Recycled Water in Projects. Encourage and promote the use of recycled water in public and private buildings, open space and streetscape planting. Strategy ES-7.11.5: On-site Recycled Water. Encourage on-site water recycling including rainwater harvesting and gray water use. Strategy ES-7.11.6: Water Conservation Programs. Benchmark and continue to track the City’s public and pri- vate municipal water use to ensure ongoing accountability and as a means of informing prioritization of future agency water conservation projects. Strategy ES-7.11.7: Green Business Certification and Water Conservation. Continue to support the City’s Green Business Certification goals of long-term water conservation within City facilities, vegetated stormwater infiltration sys- tems, parks and medians, including installation of low-flow toilets and showers, parks, installation of automatic shut-off valves in lavatories and sinks and water efficient outdoor irrigation. 283 HEALTH AND SAFETY ELEMENT Chapter 7 284 285 HS-3 CHAPTER 7 Health and Safety Element REVISED PUBLIC DRAFT CONTENTS HS-3 Introduction HS-4 Context Emergency Preparedness Fire Safety Public Safety Hazardous Materials Electromagnetic Fields Geologic and Seismic Hazards Flood Hazards Noise HS-26 Looking Forward HS-27 Goals and Policies Regional Coordination Emergency Preparedness Fire Safety Public Safety Hazardous Materials Flooding Noise INTRODUCTION Community health and public safety responsibilities have to evolve to address the community’s growth and changing needs. The City is committed to maintaining a high level of preparedness to protect the community from risks to life, property and the environment associated with both natural and human-caused disasters and hazards. In the future, more emphasis will be placed on sustainable approaches to community health and safety, including crime and fire prevention through design, improved use of technology, management of hazardous materials and improved disaster planning. This Element includes goals, policies and strategies that address the potential risks associated with these hazards, actions the City can take to reduce these risks, and ways the City and community can take more sustainable approaches for preventing or minimizing injuries to life and damages to property. 286 HS-4 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT CONTEXT Emergency Preparedness Emergencies can severely impact the health of a com- munity and a city or agency’s ability to provide needed services. Emergencies can include natural disasters such as earthquakes, floods and forest fires, or others events such as infrastructure disruptions, security incidents or hazardous spills. Emergency preparedness includes activities that are undertaken before an emergency occurs so there is an effective and coordinated response. Emergency preparedness requires the integration of the following elements into each of the City’s functions: emergency planning, coordination, mitigation, training and public education. The City, its contributing agencies, and the community are partners in ensuring that emergency planning is effectively implemented. Cupertino Emergency Plan State law requires cities to prepare an emergency plan in order to effectively respond to natural or human-caused disasters that threaten lives, the natural environment or property. The Cupertino Emergency Plan establishes an organizational framework to enable the City to manage its emergency response activities and to coordinate with County, State and Federal agencies. The Emergency Plan was prepared in accordance with the National Incident Management System (NIMS) and is used in conjunction with the State Emergency Plan, the Santa Clara Operational Disaster Response and Recovery Area Interim Agreement, Santa Clara County Emergency Plan, as well as plans and Standard Operating Procedures (SOPs) of contract agen- cies and special districts. Support personnel such as City staff, special districts and volunteer groups are trained to perform specific functions in the Emergency Operations 287 HS-5 CHAPTER 7 Health and Safety Element REVISED PUBLIC DRAFT Center. The plan is reviewed annually and tested through periodic emergency disaster drills. Emergency Operations Center The City’s Emergency Operations Center (EOC) is located on the first floor of City Hall, with an alternative location in the Service Center on Mary Avenue. The EOC has the ability to be fully functional within 30 minutes of activation. Capabilities include emergency backup power, computer network and internet access, and telephone and radio com- munications to City and County sites. While the staffing and duties are actively managed through the Emergency Plan, there may be additional physical and seismic improvements required to City Hall to ensure that it can continue to meet the requirements of an EOC. Additional communication support is provided by volunteers from Cupertino Amateur Radio Emergency Service (CARES). CARES volunteers coordinate extensive citywide communications capabilities, including helping to connect neighbors, public safety offi- cials, special districts, City and County Departments. Disaster Service Workers During emergencies, all City employees are designated Disaster Service Workers under Section 3100 of the California Government Code. They are required to remain at work as long as they are needed, and receive specific training in personal and home preparedness, First Aid, CPR, NIMS and Terrorism Awareness. Volunteer groups also play an important role in the City’s Emergency Plan. The City is part of a countywide volunteer services plan and is working with the Emergency Volunteer Center, Blockleaders, and Neighborhood Watch to develop a plan for coordinating and deploying volunteers. Citizen Corps members (CARES, CERT and MRC) continue to receive appropriate training and equipment to rapidly 288 HS-6 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT respond throughout the City and augment professional first responders. Unregistered and untrained volunteers may be utilized and trained, as needed during a disaster. Fire Safety Fire fighting and emergency medical services are provided to the City by the Santa Clara County Fire Department (SCCFD). SCCFD is a full service department that provides similar services to seven other West Valley cities and adjacent county areas. Mutual aid agreements with the neighboring jurisdictions augment SCCFD’s fire response capabilities. In addition to fire protection, SCCFD also con- ducts fire prevention inspections and educational programs, including those on Community Emergency Response Team (CERT) training, cardiopulmonary resuscitation (CPR) and first aid certification. Due to Cupertino’s geographical location, it is exposed to hazards from both wildland and urban fires. There are approximately 16 square miles of hillsides included in and around the boundary of the city. In 2009, based on vegetation data, topography and potential fire behavior, the California Department of Forestry and Fire Protection (CalFire) identified approximately three acres of the City to be in the High and Very High Fire Hazard Severity Zone. The City adopted this area as its Wildand-Urban Interface Fire Area (WUIFA). Properties in the WUIFA are subject to building and property maintenance standards intended to prevent and manage community safety due to brush and forest fires (Figure HS-1). Planning for such areas also requires attention to the availability of access roads and water for firefighting and evacuation efforts. Santa Clara County lists the Montebello Road/Stevens Canyon area as the fourth highest risk in the county. The road linking Montebello and the Palo Alto Sphere of Influence to the bottom of Stevens Canyon has been improved to acceptable standards for a fire access road. A 289 HS-7 CHAPTER 7 Health and Safety Element REVISED PUBLIC DRAFT fire trail extends from Skyline Boulevard on Charcoal Road to Stevens Canyon. The City requires that all emergency roads be constructed with an all weather surface. It also requires a private emergency access connection between public streets within Lindy Canyon and Regnart Canyon areas. Presently, there are no water systems serving the Montebello Road and upper Stevens Canyon area, with the exception of Stevens Creek itself. Because there is no water service to these areas, the County requires homes to provide individual water tanks and fire sprinkler systems (Figure HS-2). The urbanized portions of Cupertino are not exposed to a high risk of fire. The City is served by a well-managed fire protection service as well as a fire prevention program. Buildings in the City are relatively new and there is a strong code enforcement program, an adequate water supply and a well-maintained delivery system. State, regional and local standards also ensure that new buildings and facilities adequately address issues of fire safety, access, evacuation and fire-fighting requirements. Response time is one metric for measuring level of service for fighting fire and emergency services. It is the policy of SCCFD to respond to 90 percent of emergency calls not requiring a paramedic in under seven minutes. For situations where emergency medical services are required, it is the policy that paramedics arrive in less than seven minutes at least 90 percent of the time. An increase in calls for fire service and traffic congestion may affect SCCFD’s critical response time, and the District may need to adjust or expand staff, and equipment in areas of high service demand in the future. Figure HS-3 shows the location of fire stations and their service areas in Cupertino. State and Local Programs The City regulates building construction and site planning through the Uniform Fire Code and the California Building 290 HS-8 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT 0 2,100 4,200 6,3001,050 Feet Legend UrbanWildlandInterface FO O T H I L L B L V D ST E L L I N G R D De A N Z A B L V D HOMESTEAD ROAD WO L F E R D STEVENS CREEK BLVD BL A N E Y A V E MI L L E R A V E BOLLINGERRD McCLELLAN ROAD RAINBOW DRIVE BU B B R O A D PROSPECT ROAD 85 280 TAN T AU AVE Stevens Creek Reservoir Santa Clara SunnyvaleLos Altos San Jose Saratoga 01000 0500 20003000 0 0.5 1Mile 1000 Feet Meters Legend Unincorporated Areas within Urban Service Area City Boundary Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas Urban Wildland Interface N Figure HS-1 Wildland-Urban Interface Fire Area (WUIFA) 291 HS-9 CHAPTER 7 Health and Safety Element REVISED PUBLIC DRAFT FO O T H I L L B L V D ST E L L I N G R D De A N Z A B L V D HOMESTEAD ROAD WO L F E R D STEVENS CREEK BLVD BL A N E Y A V E MI L L E R A V E BOLLINGER RD McCLELLAN ROAD RAINBOW DRIVE BU B B R O A D PROSPECT ROAD 85 280 TANTAU Stevens Creek Reservoir Sunnyvale Santa Clara San Jose Saratoga Los Altos San Jose Water Company California WaterCupertino Municipal Water System (Leased to San Jose Water Company) 01000 0500 20003000 0 0.5 1Mile 1000 Feet Meters Legend City Boundary Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas Water Company Service Areas N Figure HS-2 Water Service 292 HS-10 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT FO O T H I L L B L V D ST E L L I N G R D De A N Z A B L V D HOMESTEAD ROAD WO L F E R D STEVENS CREEK BLVD BL A N E Y A V E MI L L E R A V E MI L L E R A V E BOLLINGER RD McCLELLAN ROAD RAINBOW DRIVE BU B B R O A D PROSPECT ROAD 85 280 TANTAU AVE Stevens Creek Reservoir Seven Springs Fire Station Cupertino Fire Station Monta Vista Fire Station Sunnyvale Santa Clara San Jose Saratoga Los Altos 01000 0500 20003000 0 0.5 1Mile 1000 Feet Meters Legend City Boundary Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas 3/4 Mile Serivce Area 1-1/2 Miles Service Area 2 Miles Service Area N Figure HS-3 Fire Service 293 HS-11 CHAPTER 7 Health and Safety Element REVISED PUBLIC DRAFT Code. The City and the SCCFD inspect commercial and industrial buildings for compliance with the applicable codes. In addition, the County Fire Marshal and the Fire Department regulate activities, including weed abatement and brush clearance, in the Wildland Urban Interface Fire Area (WUFIA). Public Safety The City, and a number of surrounding jurisdictions, con- tracts with the Santa Clara County Sheriff’s Office, West Valley Division, for law enforcement services. Law enforce- ment services include police patrols, criminal investigations, traffic enforcement, accident investigation and tactical teams. The City’s commitment to public safety encom- passes two broad areas of responsibilities: (1) provide public safety services and the planning necessary for the prevention of crime; and (2) plan for a safe environment in which the public is not exposed to unnecessary risks to life and property. Land use planning and site design can play a large role in crime prevention. The City considers design techniques that will minimize potential vandalism and crime when reviewing plans for future developments, including parks, public spaces, commercial, office, industrial and residential uses. These techniques include Crime Prevention Through Environmental Design (CPTED) and “defensible space” con- cepts. Implementation of “defensible space” principles that maintain a balance between privacy needs in residential neighborhoods and the need to ensure safety. The City’s Neighborhood Watch Program also encourages neighbor- hood cohesiveness and security by involving the community in the public safety effort. For non-residential areas, design techniques should be implemented that balance aesthetics, function, community-building, access for patrol vehicles, and adequate buffers for low-intensity residential uses. 294 HS-12 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Hazardous Materials Hazardous materials are a part of our everyday life in the form of batteries, light bulbs, and household chemi- cals such as pesticides, motor oil, cleaners and paints. They are also used in many commercial and industrial operations. The use, storage and disposal of hazardous materials, including management of contaminated soils and groundwater, is regulated by Federal, State and local laws. The City has adopted a Hazardous Materials Storage Ordinance that regulates the storage of these materials in solid and liquid form. The City’s Regulation of Facilities Where Materials Which Are Or May Become Toxic Gases Are Found Ordinance regulates the storage of hazardous materials in gaseous form. Figure HS-4 identifies potential sites within the city that may contain hazardous materials. Since 1990, State law has required that hazardous waste be properly disposed of in approved hazardous waste treatment or disposal facilities. To accomplish this, new treatment methods and facilities have been developed and approved to pre-treat hazardous waste before its final disposal. Under authority of the 1986 “Tanner” Bill (AB 2948), Cupertino, along with 13 other cities, joined the County to develop a comprehensive and coordinated planning approach to hazardous waste disposal. In 1990, a countywide Household Hazardous Waste (HHW) Program was created. In order to supplement the County HHW Program and make the collection of HHW more convenient for residents, the City currently provides a door-to-door hazardous waste retrieval service through its solid waste franchise agreement. Electromagnetic Fields Electromagnetic fields are a physical field produced by electrically charged objects, such has high transmission power lines. The potential health effects of the very low 295 HS-13 CHAPTER 7 Health and Safety Element REVISED PUBLIC DRAFT FO O T H I L L B L V D ST E L L I N G R D De A N Z A B L V D HOMESTEAD ROAD WO L F E R D STEVENS CREEK BLVD BL A N E Y A V E MI L L E R A V E BOLLINGER RD McCLELLAN ROAD RAINBOW DRIVE BU B B R O A D PROSPECT ROAD 85 280 TANTA U Stevens Creek Reservoir SunnyvaleLos Altos Santa Clara San Jose Saratoga 01000 0500 20003000 0 0.5 1Mile 1000 Feet Meters Legend City Boundary Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas Potential Sites N Figure HS-4 Potential Hazardous Sites 296 HS-14 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Horizontally Shifted Block Horizontal Offset of the Ground Surface A. San Andreas Fault B. Sargent - Berrocal Fault Fault Type: R ight Lateral (Strike-Slip) Fault Displacement: Horizontal Fault Type: T hrust (Dip-Slip) Fault Displacement: V ertical Vertically Elevated Block Faults within the Cupertino planning area are characterized by (A) Horizontal and (B) Vertical displacements. frequency EMFs surrounding power lines and electrical devices are the subject of on-going research and a signifi- cant amount of public debate. The US National Institute for Occupational Safety and Health (NIOSH) has issued some cautionary advisories but stresses that the data is currently too limited to draw good conclusions. Currently, electro- magnetic fields from transmission lines, electrical and wire- less facilities, and appliances are heavily regulated through Federal and State requirements. Geologic and Seismic Hazards Cupertino is located in the seismically active San Francisco Bay region, which has several active seismic faults. The San Andreas fault, one of the longest and most active faults in the world, is located west of Cupertino. Two additional faults closely associated with the San Andreas fault, the Sargent-Berrocal and Monta Vista-Shannon fault systems, also cross the western portion of the city. Movement on the San Andreas fault is predominantly right-lateral strike-slip, where the earth ruptures in a horizontal fashion, with the opposite sides of the fault moving to the right with respect to each other. Movement on the Sargent-Berrocal and Monta Vista-Shannon faults is more variable in style. Both of these faults are characterized by “thrust” faulting, where a significant amount of vertical “up-down” (so called dip-slip) displacement occurs on an inclined plane, and one side of the fault is elevated (i.e., thrust over) the other side. 297 HS-15 CHAPTER 7 Health and Safety Element REVISED PUBLIC DRAFT TABLE HS-1 EXPLANATIONS OF GEOLOGIC AND SEISMIC HAZARDS Zone Description (F)– Fault Rupture Area of potential surface fault rupture hazard within 300 feet east and 600 feet west of the Monta Vista and Berrocal faults, and within 600 feet of the San Andreas fault. (S)– Slope Instability Area includes all recognized landslide deposits, and steep walls of Stevens Creek canyon, with a moderate to high landslide potential under static or seismic conditions. Area also reflects the mapped zone of potential earthquake-induced landsliding prepared by the California Geological Survey (2002). (H)– Hillside Area contains moderate to steep slope conditions not included in the above categories, with an undetermined potential for slope instability. (L)– Liquefaction / Inundation Area where local geological, geotechnical and groundwater conditions indicate a potential for liquifaction under seismic conditions. Much of this area also has the potential for periodic flood inundation. The Liquifaction/Inundation Zone is stippled where covered by an overlaying Fault Zone. (V)– Valley Area includes all relatively level valley floor terrain not included in the above categories with relatively low levels of geologic hazard risk. TABLE HS-2 MAXIMUM EARTHQUAKE MAGNITUDES AND RECURRENCE INTERVALS Causative Faults Distance from De Anza/SCB Intersection Maximum Historic Moment Magnitude Maximum Probable Moment Magnitude Est. Recurrence Interval of Max. Prob. Earthquake San Andreas System San Andreas 5.5 miles 7.9 7.9 220 years Hayward (South)10 miles 7.0 7.0 236 years Calveras (Central)14 miles 6.3 7.0 374 years Sargent-Berrocal System Sargent-Berrocal 3.5 miles 3.7-5.0 6.8 330 years Monta Vista-Shannon 2 miles 2.0-3.0 6.8 2400 years 298 HS-16 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT FO O T H I L L B L V D ST E L L I N G R D De A N Z A B L V D HOMESTEAD ROAD WO L F E R D STEVENS CREEK BLVD BL A N E Y A V E MI L L E R A V E BOLLINGER RD McCLELLAN ROAD RAINBOW DRIVE BU B B R O A D PROSPECT RD 85 280 TANTAU Stevens Creek Reservoir S a n t a C lara County S a n t a C r uz County Sunnyvale Santa Clara San Jose Saratoga Los Altos Fault Rupture Slope Instability Hillside Inundation / Liquefaction Valley Floor Known Fault Inferred Fault Concealed Fault Urban Service Area Boundary Boundary Agreement Line F a u l t Sa n A n d r e a s F a u l t B e r r o c a l Fault M o n t a V i s t a F F F F F F H L L L LL L L L H H H V V V V V S S 01000 0500 20003000 0 0.5 1Mile 1000 Feet Meters Legend N Figure HS-5 Geologic and Seismic Hazards 299 HS-17 CHAPTER 7 Health and Safety Element REVISED PUBLIC DRAFT TABLE HS-3 ACCEPTABLE EXPOSURE TO RISK RELATED TO VARIOUS LAND USES Acceptable Exposure to Risk Land Use Group Extra Project Cost to Reduce Risk to Acceptable Level Extremely Low Group 1 VULNERABLE STRUCTURES (nuclear reactors, large dams, plants manufacturing/ storing hazardous materials) As required for maximum attainable safety Group 2 VITAL PUBLIC UTILITIES, (electrical transmission interties/substantions, regional water pipelines, treatment plants, gas mains) Design as needed to remain functional after max. prob. earthquake on local faults Group 3 COMMUNICATION/TRANSPORTATION (airports, telephones, bridges, freeways, evac. routes) 5% to 25% of project cost SMALL WATER RETENTION STRUCTURES Design as needed to remain functional after max. prob earthquake on local faults EMERGENCY CENTERS (hospitals, fire/police stations, post-earthquake aide stations, schools, City Hall and Service Center, De Anza College) Group 4 INVOLUNTARY OCCUPANCY FACILITIES (schools, prisons, convalescent and nursing homes)Design as needed to remain functional after max. prob. earthquake on local faults HIGH OCCUPANCY BUILDINGS (theaters, hotels, large office/apartment bldgs.) Moderately Low Group 5 PUBLIC UTILITIES, (electrical feeder routes, water supply turnout lines, sewage lines)5% to 25% of project cost FACILITIES IMPORTANT TO LOCAL ECONOMY Design to minimize injury, loss of life during maximum probable earthquake on local faults; need not design to remain functional Ordinary Risk Level Group 6 MINOR TRANSPORTATION (arterials and parkways) 2% of project cost; to 10% project cost in extreme casesLOW-MODERATE OCCUPANCY BUILDINGS (small apartment bldgs., single-fam. resid., motels, small commercial/office bldgs.) Group 7 VERY LOW OCCUPANCY BUILDINGS Design to resist minor earthquakes (warehouses, farm structures) w/o damage; resist mod. Earthquakes w/o struc. damage,with some nonstruct. damage; resist major earthquake (max. prob. on local faults w/o collapse, allowing some struc. & non-struc. damage OPEN SPACE & RECREATION AREAS (farm land, landfills, wildlife areas) 300 HS-18 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT TABLE HS-4 TECHNICAL INVESTIGATIONS REQUIRED BASED ON ACCEPTABLE RISK Land Use Activity Hazard Map Symbol FSH LV Evaluation Required Evaluation Required Groups 1 to 4 UBC UBC Soils Soils Geology Seismic Hazard Seismic Hazard Groups 5 to 7 UBC UBC Soils Geology Descriptions of Technical Evaluations: UBC Current, adopted version of the California Building Code Soils Soils and foundation investigation to determine ability of local soil conditions to support structures Geology Determine subsidence potential, faulting hazard, slope stability (See Geologic Map for additional detail) Seismic Detailed Soils/Structural evaluation to certify adequacy Hazard of normal UBC earthquake regulations or to recommend more stringent measures Seismic Hazard Detailed Soils/Structural evaluation to certify adequacy of normal UBC earthquake regulations or to recommend more stringent measures 301 HS-19 CHAPTER 7 Health and Safety Element REVISED PUBLIC DRAFT Primary geologic hazards in Cupertino are related to landslides and seismic impacts. Seismically induced ground shaking, surface fault rupture, and various forms of earthquake-triggered ground failure are anticipated within the city during large earthquakes. These geologic hazards present potential impacts to property and public safety. Tables HS-1 through HS-4 briefly explain seismic hazards, magnitude and occurrence, acceptable exposure rise, and technical investigations required based on acceptable risk. Figure HS-6 identifies the areas in Cupertino susceptible to the greatest risk. Also see Technical Appendix E for additional information on geologic and seismic hazards and risks. Following the 1983 Coalinga and 1994 Northridge earthquakes, scientists became increasingly aware of earthquakes generated by faults not previously observed at the earth’s surface. These types of faults are called “blind faults,” and represent a type of thrust fault that does not rupture completely to the surface. It is possible that one or more “blind faults” are present in the Monta Vista-Shannon fault system. Flood Hazards Floods are surface hydrological hazards that can have a significant, and sometimes, long lasting effect on a com- munity. Floods can originate from various sources including heavy rainstorms, landslides and/or dam failure. Sediment deposits also increase flood risks because they clog the drainage system as well as the natural percolation function of the streambeds. Rain related floods are the most common type of floods, and usually occur during periods of extended heavy rainfall. Landslides can generate floods by creating water basins where if the pressure being exerted on the blockage is not relieved, it could collapse, releasing large volumes of water 302 HS-20 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Sunnyvale Los Altos Santa Clara San Jose Saratoga Note: Flood inundation area for failure of Stevens Creek Reservoir is based upon maximum 3700 acre feet storage capacity. St e v e n s Cr e e k 0 +30 Min. Voss Ave. Pond 8-10 Acre Feet Cristo Rey Tank 2 Mil. Gal. Mercedes Tanks (2) 2 Mil. Gal. 12.2 Acre Feet 4 Mil. Gal. Regnart Canyon Tank 0.16 Mil. Gal. Regnart Heights Tank 0.14 Mil. Gal. Rainbows End Tank 0.30 Mil. Gal. Regnart Tanks 20 Mil. Gal. Stevens Creek Reservoir 3700 Acre Feet 1 Bil. 200 Mil. Gal 0 +15 Min. Mann Drive Tank 1 Mil. Gal. Proposed Tank 61.3 Acre Feet 20 Mil. Gal. FO O T H I L L B L V D ST E L L I N G R D De A N Z A B L V D HOMESTEAD ROAD WO L F E R D STEVENS CREEK BLVD BL A N E Y A V E MI L L E R A V E BOLLINGER RD McCLELLAN ROAD RAINBOW DRIVE BU B B R O A D PROSPECT ROAD 85 280 TANTAU 01000 0500 20003000 0 0.5 1Mile 1000 Feet Meters Legend City Boundary Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas Flood Limit Natural or Man-Made Water Course N Figure HS-6 Facility Failure 303 HS-21 CHAPTER 7 Health and Safety Element REVISED PUBLIC DRAFT Figure HS-7 100-Year Flood FO O T H I L L B L V D ST E L L I N G R D De A N Z A B L V D HOMESTEAD ROAD WO L F E R D STEVENS CREEK BLVD BL A N E Y A V E MI L L E R A V E BOLLINGER RD McCLELLAN ROAD RAINBOW DRIVE BU B B R O A D PROSPECT ROAD 85 280 TANTAU Stevens Creek Reservoir SunnyvaleLos Altos Santa Clara San Jose Saratoga Note: Detailed Maps of 100-Year Flood Event Are Available at City Hall Ca l a b a z a s Cre e k Creek Re g n a r t 100-Year Flood Contained In Channel 100-Year Flood Contained In Channel Pe r m a n e n t e C r e e k St e v e n s Cr e e k 01000 0500 20003000 0 0.5 1Mile 1000 Feet Meters Legend City Boundary Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas Flood Limit Natural or Man-Made Water Course Highway Major Road N 304 HS-22 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT and potentially causing injuries to people and/or damaging property. The largest body of water within the area is the Stevens Creek Reservoir. Stevens Creek Dam meets current dam safety standards and the probability of its failure is minimal (Figure HS-6). The watersheds in the Santa Cruz Mountain Range feed into four major streambeds that traverse the City: Permanente Creek, Stevens Creek, Regnart Creek, and Calabazas Creek. (Figure HS-7). Stevens Creek and its streamside are among the natural elements that have the most influence on Cupertino’s character. These creeks collect surface runoff and channel it to the Bay. However, they also pose potential flooding risks if water levels exceed the top of bank as a result of heavy runoff. The City and the Santa Clara Valley Water District are actively involved in programs to minimize the risk of flooding. The City developed an approach to land use for the non-urbanized flood plain of Stevens Creek south of Stevens Creek Boulevard in the Land Use Element. This ensures the preservation of the 100-year flood plain and the protection of the riparian corridor along this portion of Stevens Creek. The City and the Water District also developed a flood management program for the flood plain of Stevens Creek between Interstate 280 and Stevens Creek Boulevard while preserving the natural environment of Stevens Creek. Structural improvements, while not preferred, may be necessary, to protect properties from a 100-year flood. Noise The noise environment is an accumulation of many different sources, ranging from human voices to major sources such as freeway traffic. The degree to which noise becomes an annoyance depends on a variety of factors including noise level, time of day, background sounds, and surrounding land use. 305 HS-23 CHAPTER 7 Health and Safety Element REVISED PUBLIC DRAFT Community Noise Fundamentals The three elements of community noise are noise level, noise spectrum, and variation in noise level with time. Noise level is measured in decibels (dB). Noise is composed of various frequencies within a noise spectrum that define the character of the noise. Since human hearing is more sensi- tive to the higher speech frequencies, the A-weighted fre- quency network is applied, in accordance with national and international standards, to adjust the measured noise level to more closely relate to human perception of loudness. Noise environments have different characteristics that vary with duration and time of day; for instance a freeway may emit a fairly constant noise level for long periods while an airport may emit many short-term high level noise events punctuated by extended periods of quiet. To provide a standard measure for community noise exposure that takes into account the time-varying characteristics, the State of California adopted the Community Noise Equivalent Level (CNEL) as the standard metric. The CNEL is a 24-hour energy average metric that penalizes evening and nighttime noise, and provides a uniform measure for time-varying noise environments. Noise Environment The noise environment can generally be divided into two categories: transportation-related and non-transportation related noise. Traffic noise is the greatest contributor to noise pollution in Cupertino and one of the most dif- ficult to control through local effort. Two major freeways (Interstate 280 and Highway 85) and four major corridors (Stevens Creek Boulevard, De Anza Boulevard, Homestead Road, and Foothill Boulevard ) cross Cupertino. These roadways are utilized not only by local residents and employees, but also by commuters to destinations beyond Cupertino. Heavy-duty trucking operations to and from the Hanson Permanente Cement Plant and Stevens Creek 306 HS-24 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Quarry located in the western foothills near Stevens Creek Boulevard and Foothill Boulevard are also a significant transportation-related noise contributor. Cupertino receives some aircraft noise from facilities within the region including San Jose International Airport, Moffett Federal Airfield and Palo Alto Airport; however, the Cupertino city limit does not fall within the identified noise contours of any airport. One railroad line passes through the Monta Vista neighborhood and connects with the Hanson Permanente Cement Plant. This freight railway operates at very low frequencies, with approximately three train trips in each direction per week, usually during the daytime or early evening. Non-transportation noise varies from stationary equip- ment (e.g., air conditioning units) to construction activity. Regulation to minimize excessive noise from non-transpor- tation sources includes compliance with the City’s noise standards that limit certain noise-generating activity during evening and early morning, when ambient noise levels tend to be lower. Advancements in technology to muffle sound also reduce noise from construction equipment and station- ary equipment such as compressors and generators. Land Use Compatibility The Cupertino Municipal Code, Title 10, outlines the maximum noise levels on receiving properties based upon land use types (Figure HS-8). Land use decisions and the development review process play a large role in minimizing noise impacts on sensitive land uses. Noise compatibility may be achieved by avoiding the location of conflicting land uses adjacent to one another and incorporating buffers and noise control techniques including setbacks, landscap- ing, building transitions, site design, and building construc- tion techniques. Selection of the appropriate noise control technique will vary depending on the level of noise that needs to be reduced as well as the location and intended land use. 307 HS-25 CHAPTER 7 Health and Safety Element REVISED PUBLIC DRAFT Community Noise ExposureLand Use Category (Ldn or CNEL, dB) 556065707580 Residential - Multi Family Transient Lodging (Motels, Hotels) Schools, Libraries, Churches, Hospitals, Nursing Homes Auditoriums, Concert Halls, Amphitheaters Sports Arena, Outdoor Spectator Sports Playgrounds, Neighborhood Parks Golf Courses, Riding Stables, Water Recreation, Cemeteries Office Buildings, Commercial and Professional Centers Industrial, Manufacturing, Utilities, Agriculture Residential - Low Density (Single Family, Duplex, Mobile Homes) Normally Acceptable Specified land use is satisfactory, based upon the assumption that any buildings involved are of normal conventional construction, without any special noise insulation requirements. Conditionally Acceptable New construction or development should be undertaken only after a detailed analysis of the noise reduction requirements is made and needed noise reduction features included in the design. Conventional construction, but with closed windows and fresh air supply systems or air conditioning will normally suffice. Normally Unacceptable New construction or development should generally be discouraged. If new construction or development does proceed, a detailed analysis of the noise reduction requirements must be made and needed noise insulation features included in the design. Clearly Unacceptable New construction or development should generally not be undertaken. Figure HS-8 Land Use Compatibility for Community Noise Environments r 308 HS-26 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT LOOKING FORWARD As Cupertino’s resident and employee population grows, the City must identify ways to ensure public safety and support the community’s high quality of life. Innovative site design and construction techniques are needed to reduce noise in developments near major corridors and where uses are mixed to ensure compatibility. Fire protection and public safety should be enhanced in a manner that provides a high quality of service while continuing to be fiscally responsible. The following are ways the City will address key challenges and opportunities facing Cupertino: 1. Noise. As State, regional and local policies encourage mixed-use development near corridors, the City should look to ways to reduce noise impacts on residences near and in such developments through site design, landscaping and construction techniques. Additionally, the City should review locations and site design for sensitive uses including schools, childcare facilities and hospitals to ensure that they are not negatively impacted by noise. 2. Project Design and Operations. Measures such as project and building design, emergency access, opera- tions and maintenance of property, can help develop- ments promote public and fire safety. Such measures will also allow the providers to maintain a high service level, while accommodating future growth. 3. Community Participation. The City and service provid- ers should enhance community participation through new and existing programs such as neighborhood watch, emergency preparedness and school programs. 4. Shared Resources. The City can enhance emergency, fire safety and public safety services by coordinating programs with service providers and neighboring cities through shared services, mutual aid and agreements. 309 HS-27 CHAPTER 7 Health and Safety Element REVISED PUBLIC DRAFT GOALS AND POLICIES Regional Coordination The City seeks to coordinate its local requirements and emergency planning efforts with Federal, State and region- al resources to ensure a consistent, integrated and efficient approach to emergency planning. Policy HS-1.1: Regional Hazard Risk Reduction Planning Coordinate with Santa Clara County and local agencies to implement the Multi-Jurisdictional Local Hazard Mitigation Plan (LHMP) for Santa Clara County. Strategy HS-1.1.1. Monitoring and Budgeting. Monitor and evaluate the success of the LHMP, including local strategies provided in the Cupertino Annex (Section 11). Working with Santa Clara County, ensure that strategies are prioritized and implemented through the Capital Improvement Program and provide adequate budget for on-going programs and department operations. Strategy HS-1.1.2. Mitigation Incorporation. Ensure that mitigation actions identified in the LHMP are being incor- porated into upcoming City sponsored projects, where appropriate. Strategy HS-1.1.3. Hazard Mitigation Plan Amendments and Updates. Support Santa Clara County in its role as the lead agency that prepares and updates the Local Hazard Mitigation Plan. GOAL HS-1 REDUCE HAZARD RISKS THROUGH REGIONAL COORDINATION AND MITIGATION PLANNING 310 HS-28 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Policy HS-1.2: Sea Level Rise Protection Ensure all areas in Cupertino are adequately protected for the anticipated effects of sea level rise. Strategy HS-1.2.1. Monitor Rising Sea Level. Regularly coordinate with regional, state, and federal agencies on ris- ing sea levels in the San Francisco Bay and major tributaries to determine if additional adaptation strategies should be implemented to address flooding hazards. This includes monitoring FEMA flood map updates to identify areas in the city susceptible to sea level rise, addressing changes to state and regional sea and bay level rise estimates, and coordinating with adjacent municipalities on flood control improvements as appropriate. Strategy HS-1.2.2. Flood Insurance Rate Maps. Provide to the public, as available, up-to-date Flood Insurance Rate Maps (FIRM) that identify rising sea levels and changing flood conditions. Emergency Preparedness The City seeks to focus on planning and education to prepare and enlist the community in the management of disasters and emergencies. Policy HS-2.1: Promote Emergency Preparedness Distribute multi-hazard emergency preparedness infor- mation for all threats identified in the emergency plan. Information will be provided through Cardiopulmonary Resuscitation (CPR), First Aid and Community Emergency Response Team (CERT) training, lectures and seminars on GOAL HS-2 ENSURE A HIGH LEVEL OF EMERGENCY PREPAREDNESS FOR NATURAL AND HUMAN- CAUSED DISASTERS 311 HS-29 CHAPTER 7 Health and Safety Element REVISED PUBLIC DRAFT emergency preparedness, publication of monthly safety articles in the Cupertino Scene, posting of information on the Emergency Preparedness website and coordination of video and printed information at the library. Policy HS-2.2: Emergency Operations and Training Ensure ongoing training of identified City staff on their functions/responsibilities in the EOC and in disaster pre- paredness, first aid and CPR. Strategy HS-2.2.1: Emergency Operations Center (EOC). Review options to provide functional and seismic upgrades to the EOC facility at City Hall or explore alternative loca- tions for the EOC. Strategy HS-2.2.2: Employee Training. Conduct regular exercises and participate in regional exercises to ensure that employees are adequately trained. Policy HS-2.3: Volunteer Groups Continue to encourage the ongoing use of volunteer groups to augment emergency services, and clearly define responsibilities during a local emergency. Strategy HS-2.3.1: Cupertino Citizens Corps. Continue to support the Cupertino Amateur Radio Emergency Services (CARES), Community Emergency Response Team (CERT) and Medical Reserve Corp (MRC) programs to ensure the development of neighborhood based emergency prepared- ness throughout the City. Encourage ongoing cooperation with CERTs in other cities. Strategy HS-2.3.2: Community Groups. Continue pre- disaster agreements with appropriate community groups to provide specified post-disaster assistance, through the Emergency Services Coordinator and with the advice of the City Attorney. Strategy HS-2.3.3: American Red Cross. Continue to implement the American Red Cross agreements under the 312 HS-30 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT direction of the Director of Emergency Services during a disaster. Strategy HS-2.3.4: Shelter Providers. Continue the agree- ment with designated shelter sites to provide space for emergency supply containers. Strategy HS-2.3.5: Amateur Radio Operators. Continue to support training and cooperation between the City and Cupertino Amateur Radio Emergency Service (CARES) to prepare for emergency communications needs. Policy HS-2.4: Emergency Public Information Maintain an Emergency Public Information program to be used during emergency situations. Strategy HS-2.4.1: Communication Methods. Use the local TV channel, Cupertino Alert System (CAS), the Internet and other communication methods to transmit information to the citizenry. Strategy HS-2.4.2: Public Information Office. Activate the Public Information in coordination with the Sheriff and the Fire Department to provide accurate information to the public as needed. Policy HS-2.5: Disaster Medical Response Continue to coordinate with the appropriate County agen- cies and local emergency clinics to ensure preparedness and provide disaster medical response. Coordinate with the CERT members throughout the City to ensure that they are prepared to provide emergency support and first aid at the neighborhood level. Strategy HS-2.5.1: Memorandum of Understanding (MOU). Develop a MOU with local emergency clinics. The County’s role and involvement in emergencies should be considered in development of the MOU. 313 HS-31 CHAPTER 7 Health and Safety Element REVISED PUBLIC DRAFT Policy HS-2.6: Military Facilities and Readiness Consider the impact of development on neighboring military facilities and maintain military airspace to ensure military readiness. Fire Safety The City seeks to provide direction to the Santa Clara County Fire Department (SCCFD) on ways to better protect the community from natural and human-made fire disasters, and implement local policies to improve building and site design. Policy HS-3.1: Regional Coordination Coordinate wildland fire prevention efforts with adjacent jurisdictions. Encourage the County and the Midpeninsula Open Space District to implement measures to reduce fire hazards, including putting into effect the fire reduction poli- cies of the County Public Safety Element, continuing efforts in fuel management, and considering the use of “green” fire break uses for open space lands. Policy HS-3.2: Early Project Review Involve the Fire Department in the early design stage of all projects requiring public review to assure Fire Department input and modifications as needed. Policy HS-3.3: Emergency Access Ensure adequate emergency access is provided for all new hillside development. GOAL HS-3 PROTECT THE COMMUNITY FROM HAZARDS ASSOCIATED WITH WILDLAND AND URBAN FIRES 314 HS-32 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Strategy HS-3.3.1: Roadway Design. Create an all-weather emergency road system to serve rural areas. Strategy HS-3.3.2: Dead-End Street Access. Allow public use of private roadways during an emergency for hillside subdivisions that have dead-end public streets longer than 1,000 feet or find a secondary means of access. Strategy HS-3.3.3: Hillside Access Routes. Require new hillside development to have frequent grade breaks in access routes to ensure a timely response from fire personnel. Strategy HS-3.3.4: Hillside Road Upgrades. Require new hillside development to upgrade existing access roads to meet Fire Code and City standards. Policy HS-3.4: Private Residential Electronic Security Gates Discourage the use of private residential electronic security gates that act as a barrier to emergency personnel. Strategy HS-3.4.1: Location. Require a fence exception for electronic security gates in certain areas. Strategy HS-3.4.2: Access to Gates. Where electronic security gates are allowed, require the installation of an approved key switch to be accessed by the Fire District. Policy HS-3.5: Commercial and Industrial Fire Protection Guidelines Coordinate with the Fire Department to develop new guidelines for fire protection for commercial and industrial land uses. 315 HS-33 CHAPTER 7 Health and Safety Element REVISED PUBLIC DRAFT Policy HS-3.6: Fire Prevention and Emergency Preparedness Promote fire prevention and emergency preparedness through city-initiated public education programs, the gov- ernment television channel, the Internet, and the Cupertino Scene. Policy HS-3.7: Multi-Story Buildings Ensure that adequate fire protection is built into the design of multi-story buildings and require on-site fire suppression materials and equipment. Policy HS-3.8: Extension of Water Service Encourage the water companies to extend water service into the hillside and canyon areas and encourage coop- eration between water utility companies and the Fire Department in order to keep water systems in pace with growth and firefighting service needs. Public Safety The City seeks to support public safety through improved police services and better site design. Policy HS-4.1: Neighborhood Awareness Programs Continue to support the Neighborhood Watch Program and other similar programs intended to help neighborhoods prevent crime through social interaction. GOAL HS-4 ENSURE HIGH LEVEL OF COMMUNITY SAFETY WITH POLICE SERVICES THAT MEET THE COMMUNITY’S NEEDS 316 HS-34 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Policy HS-4.2: Crime Prevention through Building and Site Design Consider appropriate design techniques to reduce crime and vandalism when designing public spaces and reviewing development proposals. Strategy HS-4.2.1: Perimeter Roads for Parks. Encircle neighborhood parks with a public road to provide visual accessibility whenever possible. Strategy HS-4.2.2: Development Review. Continue to request County Sheriff review and comment on develop- ment applications for security and public safety measures. Policy HS-4.3: Fiscal Impacts Recognize fiscal impacts to the County Sheriff and City of Cupertino when approving various land use mixes. Policy HS-5.1: Seismic and Geologic Review Process Evaluate new development proposals within mapped potential hazard zones using a formal seismic/geologic review process. Use Table HS-3 of this Element to deter- mine the level of review required. Strategy HS-5.1.1: Geotechnical and Structural Analysis. Require any site with a slope exceeding 10 percent to refer- ence the Landslide Hazard Potential Zone maps of the State of California for all required geotechnical and structural analysis. Strategy HS-5.1.2: Residential Upgrades. Require that any residential facility, that is being increased more than 50 percent assessed value or physical size, conform to all GOAL HS-5 REDUCE RISKS ASSOCIATED WITH GEOLOGIC AND SEISMIC HAZARDS 317 HS-35 CHAPTER 7 Health and Safety Element REVISED PUBLIC DRAFT provisions of the current building code throughout the entire structure. Owners of residential buildings with known structural defects, such as un-reinforced garage openings, “soft first story” construction, unbolted foundations, or inadequate sheer walls are encouraged to take steps to remedy the problem and bring their buildings up to the current building code. Strategy HS-5.1.3: Geologic Review. Continue to imple- ment geologic review procedures for Geologic Reports required by the Municipal Code through the development review process. Policy HS-5.2: Public Education on Seismic Safety Reinforce the existing public education programs to help residents minimize hazards resulting from earthquakes. Strategy HS-5.2.1: Covenant on Seismic Risk. Require developers to record a covenant to tell future residents in high-risk areas about the risk and inform them that more information is in City Hall records. This is in addition to the State requirement that information on the geological report is recorded on the face of subdivision maps. Strategy HS-5.2.2: Emergency Preparedness. Publish and promote emergency preparedness activities and drills. Use the City social media, and the website to provide safety tips that may include identifying and correcting household hazards, knowing how and when to turn off utilities, help- ing family members protect themselves during and after an earthquake, recommending neighborhood preparation activities, and advising residents to maintain an emergency supply kit containing first-aid supplies, food, drinking water and battery operated radios and flashlights. Strategy HS-5.2.3: Neighborhood Response Groups. Encourage participation in Community Emergency Response Team (CERT) training. Train neighborhood groups 318 HS-36 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT to care for themselves during disasters. Actively assist in neighborhood drills and safety exercises to increase partici- pation and build community support. Strategy HS-5.2.4: Dependent Populations. As part of community-wide efforts, actively cooperate with State agencies that oversee facilities for persons with disabilities and those with access and functional needs, to ensure that such facilities conform to all health and safety requirements, including emergency planning, training, exercises and employee education. Strategy HS-5.2.5: Foreign Language Emergency Information. Obtain translated emergency preparedness materials and make them available to appropriate foreign language populations. Hazardous Materials The City is committed to protecting its citizens from hazard- ous materials through improved disposal practices, better site design and more public education. Policy HS-6.1: Hazardous Materials Storage and Disposal Require the proper storage and disposal of hazardous materials to prevent leakage, potential explosions, fire or the release of harmful fumes. Maintain information chan- nels to the residential and business communities about the illegality and danger of dumping hazardous material and waste in the storm drain system or in creeks. GOAL HS-6 PROTECT PEOPLE AND PROPERTY FROM THE RISKS ASSOCIATED WITH HAZARDOUS MATERIALS AND EXPOSURE TO ELECTROMAGNETIC FIELDS 319 HS-37 CHAPTER 7 Health and Safety Element REVISED PUBLIC DRAFT Policy HS-6.2: Proximity of Residents to Hazardous Materials Assess future residents’ exposure to hazardous materials when new residential development or childcare facilities are proposed in existing industrial and manufacturing areas. Do not allow residential development or childcare facilities if such hazardous conditions cannot be mitigated to an acceptable level of risk. Policy HS-6.3: Electromagnetic Fields (EMF) Ensure that projects meet Federal and State standards for EMF emissions through development review. Policy HS-6.4: Educational Programs Continue to encourage residents and businesses to use non- and less-hazardous products, especially less toxic pest control products, to slow the generation of new reduce hazardous waste requiring disposal through the county-wide program. Policy HS-6.5: Hazardous Waste Disposals Continue to support and facilitate for residences and busi- nesses a convenient opportunity to properly dispose of hazardous waste. Strategy HS-6.5.1: Partner on Hazardous Waste Collection and Disposal. Continue to explore efficient, eco- nomical and convenient ways to offer Household Hazardous Waste collection for residents in partnership with the Solid Waste contractor or the County. Strategy HS-6.5.2: Educational Materials. Publish educa- tional materials about the program in the Cupertino Scene, City website, and brochures that are distributed throughout the community. 320 HS-38 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Flooding The City seeks to ensure community protection from floods through the design of projects, municipal operations and public education. Policy HS-7.1: Evacuation Map Prepare and update periodically an evacuation map for the flood hazard areas and distribute it to the general public. Policy HS-7.2: Emergency Response to Dam Failure Ensure that Cupertino is prepared to respond to a potential dam failure. Strategy HS-7.2.1: Emergency and Evacuation Plan. Maintain and update a Stevens Creek Dam Failure Plan, including alert, warning and notification systems and appro- priate signage. Strategy HS-7.2.2: Inter-agency Cooperation. Continue to coordinate dam-related evacuation plans and alert/notifica- tion systems with the City of Sunnyvale and the County to ensure that traffic management between the agencies facilitates life safety. Also work with other neighboring cities to enhance communication and coordination during a dam- related emergency. Policy HS-7.3: Existing Non-Residential Uses in the Flood Plain Allow commercial and recreational uses that are now exclu- sively within the flood plain to remain in their present use or to be used for agriculture, provided it doesn’t conflict with Federal, State and regional requirements. GOAL HS-7 PROTECT PEOPLE AND PROPERTY FROM RISKS ASSOCIATED WITH FLOODS 321 HS-39 CHAPTER 7 Health and Safety Element REVISED PUBLIC DRAFT Policy HS-7.4: Construction in Flood Plains Continue to implement land use, zoning and building code regulations limiting new construction in the already urban- ized flood hazard areas recognized by the Federal Flood Insurance Administrator. Strategy HS-7.4.1: Dwellings in Natural Flood Plain. Discourage new residential development in natural flood plains. Regulate all types of redevelopment in natural flood plains. This includes prohibiting fill materials and obstruc- tions that may increase flood potential or modify the natural riparian corridors. Strategy HS-7.4.2: Description of Flood Zone Regulation. Continue to maintain and update a map of potential flood hazard areas and a description of flood zone regulations on the City’s website. Strategy HS-7.4.3: National Flood Insurance Program Community Rating System. Continue to participate in the National Flood Insurance Program (NFIP) Community Rating System (CRS). The CRS is a voluntary incentive program that recognizes and encourages community floodplain manage- ment activities that exceed minimum NFIP requirements. Flood insurance premium rates for property owners within the city may be discounted to reflect the reduced flood risk resulting from community actions meeting the three goals of the CRS, which are to: (1) reduce flood damage to insurable property; (2) strengthen and support the insurance aspects of the NFIP; and (3) encourage a comprehensive approach to floodplain management. Policy HS-7.5: Hillside Grading Restrict the extent and timing of hillside grading operations to April through October except as otherwise allowed by the City. Require performance bonds during the remain- ing time to guarantee the repair of any erosion damage. Require planting of graded slopes as soon as practical after grading is complete. 322 HS-40 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Policy HS-7.6: Stability of Existing Water Storage Facilities Assure the structural integrity of water storage facilities. Strategy HS-7.6.1: Coordination with other Agencies. Work closely with the San Jose Water Company and owners of other water storage facilities to develop and implement a program to monitor the stability of all existing water stor- age facilities and related improvements, such as: distribu- tion lines, connections and other system-components. Noise The City seeks to ensure that the community continues to enjoy a high quality of life through reduce noise pollution, effective project design and noise management operations. Policy HS-8.1: Land Use Decision Evaluation Use the Land Use Compatibility for Community Noise Environments chart and the City Municipal Code to evalu- ate land use decisions. Policy HS-8.2: Building and Site Design Minimize noise impacts through appropriate building and site design. Strategy HS-8.2.1: Commercial Delivery Areas. Locate delivery areas for new commercial and industrial develop- ments away from existing or planned homes. GOAL HS-8 MINIMIZE NOISE IMPACTS ON THE COMMUNITY AND MAINTAIN A COMPATIBLE NOISE ENVIRONMENT FOR EXISTING AND FUTURE LAND USES 323 HS-41 CHAPTER 7 Health and Safety Element REVISED PUBLIC DRAFT Strategy HS-8.2.2: Noise Control Techniques. Require analysis and implementation of techniques to control the effects of noise from industrial equipment and processes for projects near low-intensity residential uses. Strategy HS-8.2.3: Sound Wall Requirements. Exercise discretion in requiring sound walls to be sure that all other measures of noise control have been explored and that the sound wall blends with the neighborhood. Sound walls should be designed and landscaped to fit into the environment. Policy HS-8.3: Construction and Maintenance Activities Regulate construction and maintenance activities. Establish and enforce reasonable allowable periods of the day, during weekdays, weekends and holidays for construction activities. Require construction contractors to use the best available technology to minimize excessive noise and vibra- tion from construction equipment such as pile drivers, jack hammers, and vibratory rollers. Policy HS-8.4: Freeway Design and Neighborhood Noise Ensure that roads and development along Highway 85 and Interstate 280 are designed and improved in a way that minimizes neighborhood noise. Policy HS-8.5: Neighborhoods Review residents’ needs for convenience and safety and prioritize them over the convenient movement of commute or through traffic where practical. 324 HS-42 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Policy HS-8.6: Traffic Calming Solutions to Street Noise Evaluate solutions to discourage through traffic in neigh- borhoods through enhanced paving and modified street design. Strategy HS-8.6.1: Local Improvement. Modify street design to minimize noise impact to neighbors. Policy HS-8.7: Reduction of Noise from Trucking Operations Work to carry out noise mitigation measures to diminish noise along Foothill and Stevens Creek Boulevards from the quarry and cement plant trucking operations. These mea- sures include regulation of truck speed, the volume of truck activity, and trucking activity hours to avoid late evening and early morning. Alternatives to truck transport, specifi- cally rail, are strongly encouraged when feasible. Strategy HS-8.7.1: Restrictions in the County’s Use Permit. Coordinate with the County to restrict the number of trucks, their speed and noise levels along Foothill and Stevens Creek Boulevards, to the extent allowed in the Use Permit. Ensure that restrictions are monitored and enforced by the County. Strategy HS-8.7.2: Road Improvements to Reduce Truck Impacts. Consider road improvements such as medians, landscaping, noise attenuating asphalt, and other methods to reduce quarry truck impacts. 325 SECTION 7 Public Infrastructure, Facilities and Services INFRASTRUCTURE ELEMENT Chapter 8 8 326 REVISED PUBLIC DRAFT INF-2 327 INF-3 CHAPTER 8 Infrastructure Element REVISED PUBLIC DRAFT CONTENTS INF-3 Introduction INF-4 Context Water Waste Water Stormwater Telecommunications Solid Waste and Recycling INF-9 Looking Forward INF-11 Goals and Policies Citywide Infrastructure Rights-of-Way Water Stormwater Waste Water Telecommunications Solid Waste INTRODUCTION Cupertino’s public infrastructure works in tandem with the built and natural environments to contribute to the excep- tional quality of life enjoyed by local residents, visitors and workers. The city’s public and private infrastructure – water, storm drains, telecommunications and solid waste – are vital to supporting the community’s everyday activities. This Element includes goals, policies and strategies for the development and maintenance of an exceptional system of high-quality and adequate infrastructure to support com- munity needs and development anticipated in Community Vision 2040. It also ensures that the City’s existing infra- structure is maintained, upgraded, replaced and expanded when needed. The City’s commitment to environmental sustainability provides direction for innovative strategies to help the City conserve water and energy use, reduce waste, improve water and air quality, and reduce greenhouse gas emissions. 328 INF-4 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT CONTEXT The City regularly prepares a Five-Year Capital Improvement Program (CIP) to identify capital projects and options for financing them. It is the City’s primary mechanism for build- ing and maintaining citywide infrastructure such as streets, medians and stormwater systems, and City-owned facilities, parks, trails and bridges. Much of the City’s infrastructure was built between the 1950s and 1970s when it was first incorporated and devel- oped. Other areas that were later annexed into the city typically have older and/or outdated infrastructure. Planning for replacement and upgrades to these facilities will be important to ensure that all residents and businesses have access to excellent services. Identifying sustainable fund- ing sources is also important to ensure that infrastructure improvements can be built in a timely manner and effec- tively maintained to meet community needs. The following is a summary of key infrastructure systems that currently exist in Cupertino. Water Cupertino has two major water suppliers: the California Water Company and the San Jose Water Company. Both retailers purchase their water supply from the Santa Clara Valley Water District, which receives water from the Rinconada Treatment Plant and wells fed by groundwater. The Santa Clara Valley Water District, which is the ground- water management agency in Santa Clara County, manages groundwater recharge through percolation ponds and in-stream recharge of creeks. The McClellan Pond recharge facility (located in Cupertino) and the Stevens Creek Reservoir (located outside the city on its southwest bound- ary) also contribute to Cupertino’s water supply. 329 INF-5 CHAPTER 8 Infrastructure Element REVISED PUBLIC DRAFT In addition to the potable water supply, there is a potential recycled water system planned for the North Vallco Park Special Area as part of the Apple Campus 2. The City anticipates that recycled water will be used for groundwater recharge, irrigation, and will help to offset potable water use in areas served. The recycled water system can be potentially extended to serve other areas of the city in the future as capacity and demand increases and new distribu- tion lines can be built. Wastewater Wastewater collection and treatment are provided to the City by the Cupertino Sanitary District and the City of Sunnyvale. The majority of the City is served by the Cupertino Sanitary District, while the City of Sunnyvale serves only a small portion of the Cupertino Urban Service area within the Rancho Rinconada area. The Cupertino Sanitary District was formed in 1956 and is currently in the process of updating its 1964 Master Plan. The District collects and transports waste water collected in Cupertino to the San Jose/Santa Clara Water Pollution Control Plant located in North San Jose. The District maintains approximately one million linear feet of sewer lines and 500,000 linear feet of sewer laterals and 17 pump stations. While the physical condition of the infrastructure appears to be in relatively good condition, there are issues with the carrying capacity of a number of lines in the system. The lines serving the City Center development, Stevens Creek Boulevard between Randy Lane and Wolfe Road, Wolfe Road south of Interstate 280, Stelling Road and Foothill Boulevard are running either at capacity or over capacity. In order to accommodate future develop- ment, lines would have to be upgraded. Any necessary improvements are expected to be coordinated with devel- opment review, with new projects bearing their share of 330 INF-6 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT the cost or partnering with the Sanitary District to provide improvements needed to increase capacity. The City of Sunnyvale provides wastewater treatment service for Cupertino’s commercial properties along Stevens Creek Boulevard, east of Finch Avenue, and a portion of the Rancho Rinconada neighborhood. While the City of Sunnyvale has adequate capacity to serve anticipated growth and can continue to provide treatment capacity for future growth in its Cupertino service area, there may need to be improvements to the distribution network to address future growth on the east side. Any necessary improve- ments are expected to be coordinated with development review, with new projects bearing their share of the cost or partnering with the City of Sunnyvale to provide improve- ments needed to increase capacity. Stormwater Comprehensive stormwater management can reduce pol- lution and erosion, prevent flooding, recharge aquifers with clean water, and prevent Bay pollution. While efforts in early years focused on expanding storm drain capacity and wastewater treatment, the approach today is to reduce and filter runoff through project design and management. Cupertino’s storm drain system currently operates adequately, with some targeted upgrades or improve- ments likely over the next 25 years. There is only localized flooding in the storm drain system, limited primarily to unimproved streets. The City continues to update its infrastructure planning to ensure that future improvements include best practices for stormwater management. The City, along with 76 other agencies throughout the Bay Area, is regulated by the Municipal Regional Stormwater National Pollutant Discharge Elimination System Permit 331 INF-7 CHAPTER 8 Infrastructure Element REVISED PUBLIC DRAFT (MRP). The MRP, which is issued by the California Regional Water Quality Control Board, requires the City to carry out a comprehensive stormwater pollution prevention program. In order to comply with these requirements, the City joined with 15 other adjoining agencies to form the Santa Clara Valley Urban Runoff Pollution Prevention Program (SCVURPP). SCVURPP works with the participating agencies and the Regional Board to develop solutions to control urban runoff quality. In addition, the City is required to prepare a city-specific Urban Runoff Management Plan. This plan identifies stormwater pollution control measures such as design, construction and operation best practices, inspections and water-quality monitoring. The regulations are expected to evolve and become more stringent in the future. Telecommunications Cupertino is located in Silicon Valley, which is home to the world’s greatest technology companies, and is known for its forward-thinking and innovation. In order to ensure that the City can continue being an exceptional place to work and live, efforts will be made to expand access to telecom- munications services. The City does not directly supply telecommunications utilities; however, it plays an important role by coordinating with providers, allowing access to pub- lic rights-of-way, and ensuring that proposed improvements or changes in service meet community expectations and are integrated in a compatible manner. Solid Waste and Recycling Nearly every human activity leaves behind some kind of waste. Households create ordinary garbage while industrial and manufacturing processes create solid and hazardous waste. Waste uses up limited landfill space, releases toxins and creates greenhouse gases that contribute to climate 332 INF-8 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT change. The City uses recycling, reuse and reducing con- sumption as an effective way to manage solid waste. The Air Resources Board, as a means to implement AB 32, has identifies in its Scoping Plan mandatory commercial recycling as one of the measures to reduce greenhouse gas emissions. Subsequently, AB 341 set a goal of 75 percent residential and commercial recycling by 2020. Recology currently provides garbage pickup and recycling services in Cupertino. City residents and businesses served by Recology have achieved a 69 percent diversion rate in 2012. The City is currently working with Recology to develop programs to boost that diversion rate even higher, reduce contamination, and boost organics composting by residents and businesses. With the proposed changes, the City hopes to achieve the 75 percent diversion rate by 2015. To meet its future solid waste disposal needs, the City also executed a contract with Browning and Ferris to provide landfill capacity at Newby Island in Milpitas. The term of the agreement is 35 years and ends in 2023, or at the time the specified tonnage in the contract is reached. 333 INF-9 CHAPTER 8 Infrastructure Element REVISED PUBLIC DRAFT LOOKING FORWARD As the City continues to grow and develop, it will have to look at strategies for replacing and expanding the City’s aging infrastructure to meet community needs. Whereas strategies in the past focused on expansion of facilities, the focus in the future will be looking for ways to reduce demand on infrastructure through sustainable measures and balancing modes of transportation. A key strategy moving forward will be finding new ways to fund infra- structure improvements and ongoing maintenance through new development, partnerships or other methods. The following are ways the City will address key challenges and opportunities facing Cupertino: 1. Sustainable methods. The City will reduce the demand on infrastructure and services by exploring ways to expand water and energy conservation and waste diversion efforts. 2. Access. The City will ensure that the entire community has access to all services. This will include identifying areas where access is not available and looking for strategies to retrofit and partner in the construction of necessary improvements. 3. Environmental health. The City will prioritize methods that improve environmental and community health when exploring strategies to reduce demand and con- struct facilities. 4. New Technologies. The City will utilize technology to deliver services efficiently and effectively. This includes supporting emerging technologies in information ser- vices and infrastructure to better serve the business and resident community. 334 INF-10 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT 5. Coordination. The City will work with service providers to ensure that their infrastructure planning and mainte- nance goals meet community needs. 6. Community involvement. The City will enlist the com- munity in programs to achieve goals including recycling and conservation programs. 7. Funding. The City will ensure a sustainable source of funding for construction, operation and maintenance of infrastructure. 335 INF-11 CHAPTER 8 Infrastructure Element REVISED PUBLIC DRAFT GOALS AND POLICIES Citywide Infrastructure The City seeks to coordinate its municipal services with those of other service providers in order to build and main- tain infrastructure that fully serves the current and future needs of the Cupertino community. Policy INF-1.1: Infrastructure Planning Upgrade and enhance the City’s infrastructure through the City’s Capital Improvement Program (CIP) and requirements for development. Strategy INF-1.1.1: Capital Improvement Program. Ensure that CIP projects reflect the goals and policies identified in Community Vision 2040. Strategy INF-1.1.2: Design Capacity. Ensure that public infrastructure is designed to meet planned needs and to avoid the need for future upsizing. Maintain a balance between meeting future growth needs and over-sizing of infrastructure to avoid fiscal impacts or impacts to other goals. Strategy INF-1.1.3: Private Development. Require new development to pay its fair share of, or to extend or construct, improvements to the City’s infrastructure to accommodate growth without impacting service levels. GOAL INF-1 ENSURE THAT THE CITY’S INFRASTRUCTURE IS ENHANCED AND MAINTAINED TO SUPPORT EXISTING DEVELOPMENT AND FUTURE GROWTH IN A FISCALLY RESPONSIBLE MANNER 336 INF-12 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Strategy INF-1.1.4: Coordination. Require coordination of construction activity between various providers, particularly in City facilities and rights-of-way, to ensure that the community is not unnecessarily inconvenienced. Require that providers maintain adequate space for all utilities when planning and constructing their infrastructure. Policy INF-1.2: Maintenance Ensure that existing facilities are maintained to meet the community’s needs. Policy INF-1.3: Coordination Coordinate with utility and service providers to ensure that their planning and operations meet the City’s service stan- dards and future growth. Policy INF-1.4: Funding Explore funding strategies for upgrades to existing infra- structure and ongoing operations and maintenance. Strategy INF-1.4.1: Development. Require developers to expand or upgrade existing infrastructure to increase capacity, or pay their fair share, as appropriate. Strategy INF-1.4.2: Economic Development. Prioritize funding of infrastructure to stimulate economic development and job creation in order to increase opportunities for municipal revenue. 337 INF-13 CHAPTER 8 Infrastructure Element REVISED PUBLIC DRAFT Rights-of-way The City will ensure that public, City-owned rights-of-way are protected in order to support future infrastructure needs and enhanced with sustainable features when possible, and that new infrastructure is placed underground as feasible. Policy INF-2.1: Maintenance Maintain the City’s right-of-way and traffic operations systems. Policy INF-2.2: Multimodal Systems Ensure that City rights-of-way are planned for a variety of transportation alternatives including pedestrian, bicycle, automobile, as well as new technologies such as driverless cars, etc. Policy INF-2.3: Green Streets Explore the development of a “green streets” program to minimize stormwater runoff in City rights-of-way. Policy INF-2.4: Undergrounding Utilities Explore undergrounding of utilities through providers, public projects, private development and agency funding programs and grants. GOAL INF-2 ENSURE THAT CITY RIGHTS-OF- WAY ARE PROTECTED FROM INCOMPATIBLE USES AND ENHANCED WITH SUSTAINABLE FEATURES WHEN POSSIBLE 338 INF-14 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Strategy INF-2.4.1: Public and Provider generated projects. Require undergrounding of all new infrastructure projects constructed by public agencies and providers. Work with providers to underground existing overhead lines. Strategy INF-2.4.2: Development. Require undergrounding of all utility lines in new developments and highly encourage undergrounding in remodels or redevelopment of major projects. Policy INF-2.5: Recycled Water Infrastructure Plan for citywide access to recycled water and encourage its use. Strategy INF-2.5.1: Availability. Expand the availability of a recycled water system through public infrastructure projects and development review. Strategy INF-2.5.2: Use. Encourage private and public projects to incorporate the use of recycled water for landscaping and other uses. Strategy INF-2.5.3: City Facilities. Design and retrofit City buildings, facilities and landscaping to use recycled water, to the extent feasible. 339 INF-15 CHAPTER 8 Infrastructure Element REVISED PUBLIC DRAFT Water The City will seek to identify ways to improve water avail- ability, access and quality in order to maintain the long-term health of the Cupertino water system. Policy INF-3.1: Coordination with Providers Coordinate with water providers and agencies in their planning and infrastructure process to ensure that the City continues to have adequate supply for current needs and future growth. Strategy INF-3.1.1: Maintenance. Coordinate with providers to ensure that water and recycled water delivery systems are maintained in good condition. Policy INF-3.2: Regional Coordination Coordinate with State and regional agencies to ensure that policies and programs related to water provision and con- servation meet City goals. Note: additional water conservation policies are discussed in detail in the Sustainability Element. GOAL INF-3 CREATE A COORDINATED STRATEGY TO ENSURE A SUSTAINED SUPPLY OF POTABLE WATER THROUGH PLANNING AND CONSERVATION 340 INF-16 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Stormwater The City will seek to implement best practices in stormwa- ter management in order to reduce demand on the drain- age system, and reduce sediment and pollutions impacts on the Bay. Policy INF-4.1: Planning and Management Create plans and operational policies to develop and main- tain an effective and efficient stormwater system. Strategy INF-4.1.1: Management. Reduce the demand on storm drain capacity through implementation of programs that meet and even exceed on-site drainage requirements. Strategy INF-4.1.2: Infrastructure. Develop a Capital Improvement Program (CIP) for the City’s storm drain infrastructure that meets the current and future needs of the community. Strategy INF-4.1.3: Maintenance. Ensure that City’s storm drain infrastructure is appropriately maintained to reduce flood hazards through implementation of best practices. GOAL INF-4 IMPLEMENT BEST PRACTICES IN STORMWATER MANAGEMENT TO REDUCE DEMAND ON THE STORMWATER NETWORK, REDUCE SOIL EROSION, AND REDUCE POLLUTION INTO RESERVOIRS AND THE BAY 341 INF-17 CHAPTER 8 Infrastructure Element REVISED PUBLIC DRAFT Policy INF-4.2: Funding Develop permanent sources of funding storm water infra- structure construction and maintenance. Strategy INF-4.2.2: Ongoing Operations. Review other funding strategies to pay for the ongoing operations and maintenance of the storm drain system per State and regional requirements. Note: additional policies that meet State and regional run- off reduction are described in the Sustainability Element. Waste Water The City will ensure that there is adequate and well- maintained waste water capacity through infrastructure enhancements and policies that reduce impact on sanitary sewer system, and that pollution in reservoirs and the Bay is minimized. Policy INF-5.1: Infrastructure Ensure that the infrastructure plans for Cupertino’s waste water system providers continue to meet the City’s current and future needs. Strategy INF-5.1.1: Coordination. Coordinate with the Cupertino Sanitary District on their Master Plan and the Sunnyvale Treatment Plant to develop a comprehensive capital improvement program to ensure adequate capacity for future development anticipated with General Plan buildout. GOAL INF-5 ENSURE THAT THE CITY’S WASTEWATER SYSTEM CONTINUES TO MEET CURRENT AND FUTURE NEEDS 342 INF-18 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Strategy INF-5.1.2: Development. Require developers to pay their fair share of costs for, or in some cases construct, infrastructure upgrades to ensure that service levels are met. Policy INF-5.2: Demand Look for ways to reduce demand on the City’s wastewater system through implementation of water conservation measures. Telecommunications The City will promote expansion of a citywide telecom- munications system that provides excellent services to businesses and residents, and encourages innovative tech- nologies for the future. Policy INF-6.1: Telecommunications Master Plan Maintain and update a Telecommunications Master Plan with regulations and guidelines for wireless and emerging technologies. Policy INF-6.2: Coordination Coordinate with providers to improve access and delivery of services to businesses and homes. GOAL INF-6 ENCOURAGE INNOVATIVE TECHNOLOGIES AND COMMUNICATION SYSTEMS THAT PROVIDE EXCELLENT SERVICES TO BUSINESSES AND RESIDENTS 343 INF-19 CHAPTER 8 Infrastructure Element REVISED PUBLIC DRAFT Strategy INF-6.2.1: Facility Upgrades. When possible, require service providers to upgrade existing facilities as part of permit or lease renewals. Encourage use of newer technologies that allow the facility components to be reduced in size or improve screening or camouflaging. Strategy INF-6.2.2: Improved Access. Work with providers to expand service to areas that are not served by telecommunications technologies. Strategy INF-6.2.3: City Facilities. Encourage leasing of City sites to expand access to telecommunications services. Develop standards for the incorporation of telecommunications systems and public use. Strategy INF-6.2.4: Agency and Private Facilities. Encourage the installation of communications infrastructure in facilities owned by other public agencies and private development. Strategy INF-6.2.5: Communications Infrastructure. Support the extension and access to telecommunications infrastructure such as fiber optic cables. Policy INF-6.3: Emerging Technologies Encourage new and innovative technologies and partner with providers to provide the community with access to these services. Strategy INF-6.3.1: Strategic Technology Plan. Create and update a Strategic Technology Plan for the City to improve service efficiency. 344 INF-20 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT 0 2,100 4,200 6,3001,050 Feet Legend District CUPERTINO SANITARY DISTRICT SUNNYVALE SANITARY DISTRICT 01000 0500 20003000 0 0.5 1Mile 1000 Feet Meters Legend Unincorporated Areas within Urban Service Area City Boundary Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas Sunnyvale Sanitary District Cupertino Sanitary District N FO O T H I L L B L V D ST E L L I N G R D De A N Z A B L V D HOMESTEAD ROAD WO L F E R D STEVENS CREEK BLVD BL A N E Y A V E MI L L E R A V E BOLLINGERRD McCLELLAN ROAD RAINBOW DRIVE BU B B R O A D PROSPECT ROAD 85 280 TAN T AU AVE Stevens Creek Reservoir Santa Clara SunnyvaleLos Altos San Jose Saratoga Solid Waste The City seeks to reduce solid waste and demands on landfills, reduce the release of toxins in the air (including greenhouse gas emissions) and improve community health. Policy INF-7.1: Providers Coordinate with solid waste system providers to utilize the latest technology and best practices to encourage waste reduction and meet, and even, exceed State targets. Policy INF-7.2: Facilities Ensure that public and private developments build new and on-site facilities and/or retrofit existing on-site facilities to meet the City’s waste diversion requirements. Policy INF-7.3: Operations Encourage public agencies and private property owners to design their operations to meet, and even, exceed regula- tory waste diversion requirements. Strategy INF-7.3.1: City Facilities and Events. Design new City facilities and retrofit existing facilities and event venues with recycling and trash collection bins to facilitate easy disposal of recyclable and compostable waste by staff and the public. GOAL INF-7 ENSURE THAT THE CITY MEETS AND EXCEEDS REGULATORY WASTE DIVERSION GOALS BY WORKING WITH PROVIDERS, BUSINESSES AND RESIDENTS 345 INF-21 CHAPTER 8 Infrastructure Element REVISED PUBLIC DRAFT 0 2,100 4,200 6,3001,050 Feet Legend District CUPERTINO SANITARY DISTRICT SUNNYVALE SANITARY DISTRICT 01000 0500 20003000 0 0.5 1Mile 1000 Feet Meters Legend Unincorporated Areas within Urban Service Area City Boundary Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas Sunnyvale Sanitary District Cupertino Sanitary District N FO O T H I L L B L V D ST E L L I N G R D De A N Z A B L V D HOMESTEAD ROAD WO L F E R D STEVENS CREEK BLVD BL A N E Y A V E MI L L E R A V E BOLLINGERRD McCLELLAN ROAD RAINBOW DRIVE BU B B R O A D PROSPECT ROAD 85 280 TAN T AU AVE Stevens Creek Reservoir Santa Clara SunnyvaleLos Altos San Jose Saratoga Figure INF-1 Waste Water Service 346 INF-22 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Strategy INF-7.3.2: Construction Waste. Encourage recycling and reuse of building materials during demolition and construction of City, agency and private projects. Strategy INF-7.3.3: Recycled Materials. Encourage the use of recycled materials and sustainably harvested materials in City, agency and private projects. Policy INF-7.4: Product Stewardship Per the City’s Extended Producer Responsibility (EPR) policy, support statewide and regional EPR initiatives and legisla- tion to reduce waste and toxins in products, processes and packaging. Policy INF-8.1: Reducing Waste Meet or exceed Federal, State and regional requirements for solid waste diversion through implementation of programs. Strategy INF-8.1.1: Outreach. Conduct and enhance programs that promote waste reduction in schools, businesses and homes through partnerships with schools, the Chamber of Commerce and the City’s neighborhood programs. Strategy INF-8.1.2: Hazardous Waste. Work with providers and businesses to provide convenient hazardous and e-waste facilities for the community. GOAL INF-8 DEVELOP AND ENHANCE PROGRAMS THAT REDUCE, REUSE AND RECYCLE WASTE 347 INF-23 CHAPTER 8 Infrastructure Element REVISED PUBLIC DRAFT Strategy INF-8.1.3: Preferential Purchasing. Maintain and update a City preferential purchasing policy to products that reduce packaging waste, greenhouse gas emissions, toxic contaminants and are reusable. Strategy INF-8.1.4: Reuse. Encourage reuse of materials and reusable products. Develop a program for reuse of materials and reusable products in City facilities and outreach programs for community-wide participation by promoting community-wide garage sales and online venues. Strategy INF-8.1.5: Collaboration. Collaborate with agencies and large businesses or projects to enhance opportunities for community-wide recycling, reuse and reduction programs. 348 SECTION 7 Public Infrastructure, Facilities and Services RECREATION, PARKS AND COMMUNITY SERVICES ELEMENT Chapter 9 9 349 REVISED PUBLIC DRAFT RPC-2 350 RPC-3 CHAPTER 9 Recreation, Parks and Community Services Element REVISED PUBLIC DRAFT CONTENTS RPC-3 Introduction RPC-4 Context Parks and Open Space Park Standards Park Accessibility Recreation Programs Schools Libraries RPC-21 Looking Forward RPC-23 Goals and Policies Parks and Open Space Trails Recreation Programs and Services Community Services INTRODUCTION Cupertino’s parks, recreation programs and community ser- vices complement the built and natural environments and enhance the community. They enliven our Neighborhoods and Special Areas and help promote health, interactions and community-building. This Element includes goals, policies and strategies for the development and maintenance of an exceptional and inte- grated system of high-quality parks, recreational amenities and community services that support current and future needs anticipated in Community Vision 2040. As Cupertino grows over time, the city’s parks and recreation programs will have to adapt to meet changing needs. This Element ensures that the City will continue to provide high-quality parks and recreation programs, improve the distribution and access to these facilities, work with other community service providers, and protect open space. 351 RPC-4 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT CONTEXT Parks and Open Space Cupertino currently has approximately 165 acres of City- owned public parks and open space areas. The City’s park system is supplemented by a network of over 220 acres of local and regional interconnected trails that stretch from local open space preserves to the San Francisco Bay. In addition, there are many acres of open space preserves surrounding the city that are operated and maintained by regional agencies and districts, including over 40 acres of open space negotiated through public access agreements. Figures RPC-1 and RPC-2 show the locations of open space areas within and near Cupertino. Local residents, visitors and employees also enjoy a wide range of community services provided by the City and other agencies and districts. Looking towards the future, the City will have to manage its resources effectively and coordinate with other agency providers to ensure that the community’s growing and changing needs are met. The following is a summary of the future direction for the City’s approach to planning, designing and managing open space to ensuring the community’s continued health and quality of life. Regional Resources Several public agencies share the task of acquiring and maintaining open space for the enjoyment within Cupertino and neighboring cities. Cupertino’s land uses in and around these areas typically include low-intensity residential uses, which are consistent with protecting open space areas. FO O T H I L L B L V D STEVENS CREEK BLVD McCLELLAN RD Stevens Creek County Park Linda Vista City Park McClellan Ranch Park Deep Cliff Golf Course Figure RPC-1 Public Open Space in the Stevens Creek Corridor FO O T H I L L B L V D STEVENS CREEK BLVD McCLELLAN RD Stevens Creek County Park Linda Vista City Park McClellan Ranch Park Deep Cliff Golf Course (Based on the September 23, 2002 Stevens Creek Trail Feasibility Study) 01000 0500 20003000 0 0.5 1M ile 1000 Feet Meters Legend Existing City/County Public Open Space Existing Private Open Space Proposed Open Space Linkage N 352 RPC-5 CHAPTER 9 Recreation, Parks and Community Services Element REVISED PUBLIC DRAFT Sa n t a C r u z C o u n t y Sa n M a t e o C o u n t y Santa Cr u z Santa Cl ara San Mateo Santa Clara FO O T H I L L B L V D ST E L L I N G R D De A N Z A B L V D HOMESTEAD ROAD WO L F E R D STEVENS CREEK BLVD BL A N E Y A V E MI L L E R A V E BOLLINGER RD McCLELLAN ROAD RAINBOW DRIVE BU B B R O A D PROSPECT RD 85 280 TANTAU Proposed Stevens Creek Trail Corridor Upper Stevens Creek County Park Monte Bello Open Space Preserve Monte Bello Open Space Preserve Picchetti Ranch Area Saratoga Gap Open Space Preserve Long Ridge Open Space Preserve Stevens Creek County Park Fremont Older Open Space Preserve Rancho San Antonio Open Space Preserve Rancho San Antonio County Park Linda Vista City Park San Jose Existing County Parks Existing MidPeninsula Regional Open Space Preserve Proposed Expansion of Regional Open Space Lands Public Access to Open Space Preserves Proposed Open Space Linkages Sunnyvale Santa Clara Saratoga Los Altos There are over 13,000 acres (over 20 square miles) of public open space in Cupertino's boundary agreement area and contiguous jurisdictions. 01000 0500 20003000 0 0.5 1M ile 1000 Feet Meters Legend City Boundary Heart of the City Boundary Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas N Figure RPC-2 Open Space 353 RPC-6 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Midpeninsula Regional Open Space District The Midpeninsula Regional Open Space District was cre- ated in 1972 and manages about 62,000 acres of mountain- ous, foothill and bayland open space in 26 open space preserves. Preserves adjacent to Cupertino are located to the south and west around the foothills, and include Rancho San Antonio, Pichetti Ranch and Fremont Older. Santa Clara County Parks The Santa Clara County park program was a voter-approved measure to acquire and develop a regional park system. County parks adjacent to Cupertino are located near the southwestern boundary of the city. The County Park plan emphasizes completing Upper Stevens Creek Park and its connection to Stevens Creek near Cupertino. Because the upper portions of Stevens Canyon are environmentally important, the County Parks and Recreation Department has made a commitment to purchase lands to connect these two parks. In 1997, as part the development of a portion of the San Jose Diocese’s St. Joseph’s Seminary property, the County was able to acquire 133 acres of open space to add to its original holdings in the Rancho San Antonio County Park (which is now managed by the Mid- Peninsula Open Space District). Santa Clara Valley Water District Open Space Areas Trails along creeks owned and managed by the Santa Clara Valley Water District supplement Cupertino’s overall open space and park system. The District coordinates with the City to prepare its natural flood plain policy for Stevens Creek between Stevens Creek Boulevard and the Stevens Creek reservoir, and also helped with the acquisi- tion of open space lands within McClellan Ranch Park. The District has a plan to partner with cities and the county to provide access to creekside trails and parks for recreational 354 RPC-7 CHAPTER 9 Recreation, Parks and Community Services Element REVISED PUBLIC DRAFT opportunities. This plan, called the Clean, Safe Creeks and Natural Flood Protection plan, requires the District to incorporate trails, parks and recreational opportunities into existing or new flood protection projects. Such projects are also part of the District’s plan to manage flooding in downstream locations by providing retention facilities in upstream locations. City Community and Neighborhood Parks The City has an excellent system of community and neigh- borhood parks that provide a place for community gather- ing, recreation and healthy programs. All existing parks and open space areas are shown in Figure RPC-3 and listed in Table RPC-1. Community parks include Memorial Park and the Stevens Creek corridor area. Memorial Park is an urban park and facility venue for festivals located in the Heart of the City Special Area. The Sports Center, located at the intersection of Stevens Creek Boulevard and Stelling Road, provides a gym and tennis facilities. The Sports Center also has a small facility where teens can gather and play indoor sports. A Senior Center is located at the intersection of Stevens Creek Boulevard and Mary Avenue, which runs programs for seniors in Cupertino. The Quinlan Community Center, located on Stelling Road, runs the bulk of the art, dance, music and other community programs. All of these facilities are located around Memorial Park. The Civic Center complex, located in the central part of the city, provides an additional community venue for gathering and programs. It consists of City Hall, Community Hall and Library Field, which offers indoor and outdoor venues for meetings, functions and outdoor recreation. The Cupertino Library, a facility owned by the City but operated by the County Library District, is also located in the Civic Center complex. 355 RPC-8 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT A-1 A-2 B C N E-1 E-2 G O K MF-1 F-2 P-1 P-2 L-1 L-2 H-1 H-2 I-1 I-2 J-1 J-2 FO O T H I L L B L V D ST E L L I N G R D De A N Z A B L V D HOMESTEAD ROAD WO LFE R D STEVENS CREEK BLVD BL A N E Y A V E MI L L E R A V E BOLLINGER RD McCLELLAN ROAD RAINBOW DRIVE BU B B R O A D PROSPECT ROAD 85 280 TANTAU AVE Stevens Creek Reservoir Canyon Oak Park Varian Park Sommerset Square Park Little Rancho Park Monta VistaPark McClellan Ranch Park Blackberry Farm Linda Vista Park Kennedy Jr. H.S. Regnart Elem. Jollyman Park Hoover Park 3 Oaks Park Library Field Civic CenterPlaza Cali Plaza Eaton Elem.Hyde Jr. HS Faria Elem. Memorial Park Garden Gate Elem.Stevens Creek Elem. Sports Center Wilson Park PortalPark Creekside Park Lincoln Elem. Mary Ave Dog Park Sunnyvale Santa Clara San Jose Saratoga Los Altos Franco Park Sterling Barnhart Park 01000 0500 20003000 0 0.5 1Mile 1000 Feet Meters Legend City Boundary Heart of the City Boundary Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas Cupertino Neighborhood Parks Community Park Schools Mini Parks Main Street Town Square Easement L.P. Collins Elementary Field City Center Easement Cupertino Hills Swim & Racquet Club Private Recreation Community Pool Deep Cliff Golf Course N Rancho Rinconada Recreation & Park Civic CenterPark Main Street Park Easement Figure RPC-3 Park Areas 356 RPC-9 CHAPTER 9 Recreation, Parks and Community Services Element REVISED PUBLIC DRAFT TABLE RPC-1 EXISTING PARK AND RECREATION ACREAGE BY AREA Area Res Parks/ Open Space Acre Neighborhood Park AcreCommunity Park AcreSchoolAcre A-1 A-2 Stocklmeir Ranch Blesch Parcel Stevens Creek Trail 5.0 0.6 2.4 McClellan Ranch McClellan Ranch West (Simms Property) Blackberry Farm Park Blackberry Farm Golf Course 16.0 3.0 21.5 16.5 B Cupertino Hills Swim and Racquet Club*** 2.98 Linda Vista 11.0 Monta Vista HS Kennedy Jr. HS Lincoln Elem. Regnant Elem. 10.0* 9.0 3.0 3.0 C E-1 Varian Park 6.0 Stevens Ck. Elem 3.0 E-2 Monta Vista 6.0 F-1 Forge Apts 0.5*Villa Serra 0.61 Franco Park 0.61 Homestead HS 10.0* F-2 Memorial Park Sports Center 20.0 6.2 Garden Gate Elem.3.0 G Sommerset Square 2.0 Mary Avenue Dog Park 0.5 H-1 Faria Elem. 3.0 H-2 Jollyman11.5 I-1 City Center Amphitheater 1.39*Wilson Park Library Field 8.0 3.0 Cali Mill Plaza Park** Civic Center Park** Library Plaza Civic Center Plaza 1.0 0.71.0 0.5 Eaton Elem. 3.0 I-2 Creekside13.0 J-1 Cupertino HS 10.0* J-2 Hyde Jr. HS Sedgewick Elem. 6.0 4.0* K Rancho Rinconada Swim Rec Facility** 2.0 Sterling Barnhart 0.6 L-1 L-2 Portal Park 4.0 Collins Elem. Portal Elem. 3.0 1.71* M Hampton Apt Arioso Apts 0.5*Main Street Park Easement Town Square Easement .75 0.80.5* N Oak Valley (2) Canyon Oak Park 0.94 0.4 Little Rancho Park 0.34 O P-1 Three Oaks 3.0 P-2 Hoover6.0 Total by Park Type 14.32 74.71 89.4 36 Total All Types 214.43 Notes: * Not included in park acreage, **Privately owned, public access, ***Privately owned 357 RPC-10 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT The Stevens Creek Corridor, located in the Monta Vista Planning Area, has a natural environment with trails, swimming facilities, group picnic areas, historic orchard (Stocklmeir), historic ranch (McClellan Ranch), a nine-hole golf course (Blackberry Farm Golf Course) and related sup- port facilities. Blackberry Farm Recreational area’s swimming facilities, recreation programs and reserved picnic areas are only available in the summer, although access to the Stevens Creek Corridor trails is available year round. The City is in the process of preparing a Stevens Creek Corridor Master Plan to review the design and planning of facilities and programs throughout the Stevens Creek corridor. City objectives for the plan include accommodating year-around use of the facilities in the corridor; reviewing and revising the plans for the golf course, McClellan Ranch, Stocklmeir, McClellan Ranch West (Simms) and Blesch properties; incorporating the trail system; restoring Stevens Creek; and addressing neighborhood issues. In addition to these community facilities, the City also has a system of neighborhood parks of varying sizes and types that are located throughout Cupertino. Each neighborhood park offers a variety of opportunities for passive and active recreation for adjacent neighborhoods and recreational programs for the community. Lastly, the City also has agree- ments with the school districts to maintain school fields in return for allowing the community to use the fields, when they are not in use by the schools. Private and Semi-Public Open Space Resources There are several private, open space and recreational activ- ity businesses in Cupertino that support the recreational needs of the community. They include the Deep Cliff Golf Course and the Cupertino Hills Swim and Racquet Club in the Monta Vista Planning Area, as well as riding stables in the foothills. The Rancho Rinconada Recreation Center, 358 RPC-11 CHAPTER 9 Recreation, Parks and Community Services Element REVISED PUBLIC DRAFT a swim and recreational facility operated by a separate District, is available publicly to residents of the Rancho Rinconada Area. These facilities are valuable to the com- munity because they often provide services that are not tra- ditionally provided by the public sector on City or regional parklands. Several hillside and urban subdivisions, and apartment complexes, offer both natural and built recreational facilities for their residents. Private open spaces that are accessible to the public include Cali Mill Plaza at the intersection of Stevens Creek and De Anza Boulevards, Civic Park in the Town Center development across from the Civic Center, and the park at the Main Street development along Stevens Creek Boulevard east of Wolfe Road. Lastly, utility power line corridors in the city’s foothills provide public paths and trails through open space areas. Trails Trails and paths connect people to each other, create access to open space areas and parks, and provide an alternative to driving from place to place. Promoting more trails and connectivity along creeks, hillsides and through neighborhoods is a major objective of the General Plan. Providing access to open space and parks is not completely dependent on trails. Sidewalks and streets can also connect pedestrians to their destinations. However, occasional bar- riers often pose an issue when they break the continuity. Future plans for these areas should enhance connectivity to neighborhoods and other parts of the city. Each major trail corridor in Cupertino is discussed in greater detail below. In addition to these trail corridors, the City also seeks to expand access to other trails through grants and develop- ment review. Figure RPC-4 identifies major trail linkages in Cupertino. 359 RPC-12 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT FO O T H I L L B L V D ST E L L I N G R D De A N Z A B L V D HOMESTEAD ROAD WO L F E R D STEVENS CREEK BLVD BL A N E Y A V E MI L L E R A V E BOLLINGER RD McCLELLAN ROAD RAINBOW DRIVE BU B B R O A D PROSPECT ROAD 85 280 TANTAU Stevens Creek Reservoir Sunnyvale Santa Clara San Jose Saratoga Existing or Proposed Trail Linkages Future Trail Linkages Los Altos Potential Trails Potential Alternative Trail Alignment N Calabazas Creek Trail San Tomas Aquino Trail San Tomas Aquino Trail Linda Vista Park Rancho San Antonio Park 01000 0500 20003000 0 0.5 1Mile 1000 Feet Meters Legend City Boundary Heart of the City Boundary Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas Figure RPC-4 Trails Linkage 360 RPC-13 CHAPTER 9 Recreation, Parks and Community Services Element REVISED PUBLIC DRAFT Stevens Creek The 65 acre Stevens Creek corridor is Cupertino’s most prominent urban open space/trail resource. The land is designated for recreation, parklands and farming, and provides flood plain area for the creek. Adjoining proper- ties are zoned for low-density residential use. The Stevens Creek Corridor Plan retains the open space character of the Stevens Creek greenbelt between the Stevens Creek reservoir and Stevens Creek Boulevard, and offers histori- cal significance relating to the Juan Bautista De Anza Trail designation. The City is participating with adjacent cities including Sunnyvale, Los Altos and Mountain View in a Four Cities Coordinated Stevens Creek Trail Feasibility Study to explore connections for a trail following Stevens Creek, extending to the San Francisco Bay. The study is currently in progress and is expected to be completed in 2015. The City will implement recommendations from the study endorsed by the City Council. The City’s acquisition of Linda Vista Park, McClellan Ranch, Blackberry Farm, and the McClellan Ranch West (Simms), Stocklmeir properties, and more recently, the Blesch property support these planning efforts. The 2002 Stevens Creek Trail Feasibility study concluded that it is feasible to construct 7.7 miles of separated and on-street multi-use paths connecting to Rancho San Antonio and Stevens Creek County parks. To complete the trail, a public trail easement through the approximately 150 acre former quarry property south of Linda Vista Park will be established when the property is proposed for develop- ment. The former quarry haul road connects Linda Vista Park to McClellan Road. It is under the same ownership as the quarry and is necessary to link these properties. Full build out of the Stevens Creek trail is expected to take about 10 to 15 years. 361 RPC-14 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Calabazas Creek There is an opportunity for a trail along Calabazas Creek that would connect the South Vallco Planning Area to Cupertino High School and Creekside Park. The Santa Clara Valley Water District’s Clean, Safe Creeks and Natural Flood Protection Plan calls for identifying recreation opportunities along the creek as part of the flood protection project. San Tomas-Aquino/Saratoga Creek Cupertino’s section of the 12 mile San Tomas-Aquino Trail crosses into the city from Santa Clara on Pruneridge Avenue, extends to bicycle lanes on Bollinger Road, and further extends north-south along the city limit between San Jose and Cupertino. The City has explored the potential to create a linear Lawrence-Mitty Park along the creek with the cooperation of Santa Clara County, neighboring jurisdic- tions and the Santa Clara Valley Water District. Union Pacific Railroad The 8.7 mile proposed Union Pacific Rail Trail corridor extends through the cities of Cupertino, Saratoga, Campbell and the town of Los Gatos. The trail would link to the Los Gatos Creek Trail, connecting the two most heavily used parks in Santa Clara County: Rancho San Antonio County Park and Vasona County Park. A feasibility study found that this project is not feasible at this time. Acquisition of right-of-way or easements is anticipated when the Railroad goes out of service or is able to relin- quish right-of-way. The corridor is designated as a proposed trail on the Trail Linkages diagram. Should the railroad corridor use change, provision for a continuous trail through the corridor must be included as a project component. 362 RPC-15 CHAPTER 9 Recreation, Parks and Community Services Element REVISED PUBLIC DRAFT Don Burnett Bicycle-Pedestrian Bridge The Don Burnett Bicycle-Pedestrian Bridge (formerly known as the Mary Avenue Bicycle Footbridge) links the Sunnyvale and north side of I-280 to De Anza College, Memorial Park and the Oaks Shopping Center. It was opened in 2009 and is enjoyed by pedestrians, bicyclists and school children. Its unique design creates a gateway into Cupertino and a landmark for the area. Interstate 280 Trail This is a potential trail along the drainage channel on the south side of I-280. The trail has the potential of connect- ing several significant nodes in the city starting from the Calabazas Creek connection across from the Main Street development to Vallco Shopping District, and ending at De Anza Boulevard. The trail could be potentially extended west of De Anza Boulevard in a later phase. A number of development projects have contributed to a study and potential improvements to implement the trail. The tim- ing of the study is expected to be coordinated with the redevelopment of the Vallco Shopping District and other developments in the area. The City will have to coordinate with the Santa Clara County Valley Water District on the project since it owns the drainage channel. Park Standards A well-planned park program incorporates a variety of facilities and programs to meet the community’s needs. The program must also be flexible so that it can be updated as the community grows and changes in the future. The City is proposing a Parks and Recreation Master Plan that responds to these issues. Key elements of such a master plan will include parks performance standards, a classifica- tion system of park type and a recreation program for the community. The master plan will also identify locations 363 RPC-16 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT where additional capacity is needed to meet the current and future needs of its residents and workers and strategies to bridge the gaps. The City is fortunate to have access to a multitude of trails and regional park resources within Cupertino, which, along with the City’s inventory of available parkland, provides approximately 430 acres of park and recreation area for city residents (or approximately 7.37 acres of parkland per 1,000 residents). The City’s inventory of available parkland, which includes community and neighborhood parks as well as publicly accessible parks through agreements, is approximately 210 acres (or approximately 3.6 acres per 1,000 residents). If the amount of parkland accessible due to agreements with the Cupertino Union School District is excluded, the available parkland is 174 acres (or approxi- mately 2.98 acres per 1,000 residents). The City’s standard currently specifies three acres of park- land per 1,000 residents. However, the City should continue to explore raising the parkland standard to five acres per 1,000 residents for its parks acquisition program. Park Accessibility One of the City’s key objectives in planning for neighbor- hoods is to distribute parks and open space within the community so that all residents can safely walk or bike to a recreation facility. This has the advantage of improving neighborhood identity, social interactions and the overall health of the community. Figure RPC-5 shows the neighborhoods and the 1/2 mile service area radius for neighborhood parks. The service area map includes walking and biking impediments due to physical barriers, such as freeways, railroad tracks or stream beds. In addition, busy streets may discourage some people, especially young children, from visiting nearby parks. The Complete Streets policies in the Mobility 364 RPC-17 CHAPTER 9 Recreation, Parks and Community Services Element REVISED PUBLIC DRAFT Sunnyvale Santa Clara San Jose Saratoga Los Altos FO O T H I L L BL V D ST E L L I N G R D De A N Z A B L V D HOMESTEAD ROAD WO L F E R D STEVENS CREEK BLVD BL A N E Y A V E MI L L E R A V E TA N T A U A V E BOLLINGER R D McCLELLAN ROAD RAINBOWDRIVE BU B B R O A D PROSPECT ROAD 85 280 Stevens Creek Reservoir Canyon Oak Park Varian Park Sommerset Square Park Little Rancho Park Monta Vista Park Jollyman Park Hoover Park 3 Oaks Park Library Field Memorial Park Franco Park Mary Ave Dog Park Wilson Park Portal Park Main Street Town Square Easement Creekside Park Sterling Barnhart ParkMcClellan Park Linda Vista Park Blackberry Farm Cali Plaza Library Plaza CivicCenterPark Civic CenterPlaza City Center Easement Main Street Park Easement Sports Center 01000 0500 20003000 0 0.5 1M ile 1000 Feet Meters Legend City Boundary Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas 1/2 Mile Access Range From Park Sites Existing Park Site L.P. Collins Elementary Field N Figure RPC-5 Park Access 365 RPC-18 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Element will work in tandem with parks planning to ensure that key intersections connecting neighborhoods to services are improved for pedestrian and bicycle connections. Table RPC-2 shows the park and open space acreage proposed by area. Acquisition strategies will include agree- ments to allowing community use of school sites, expand- ing and making modifications to existing parks, leveraging State and regional funding, and park dedication require- ments for major new developments. Recreation Programs The City offers a variety of recreation programs for residents ranging from pre-school age children to its seniors. These include sports, arts, educational programs, teen programs, senior programs and services, special festivals and events and other activities. As the community profile changes, these programs will have to evolve to address their specific needs. The City is continuously working to refine and revise its programs to serve its population, while ensuring that the programs can be mostly maintained by fees charged. Programs such as environmental education, health and wellness, after school programs, art and cultural diversity programs, science and math camps, and adventure pro- grams are examples of programs that are growing in need and popularity. Schools Cupertino is served by excellent institutions of public education. Cupertino Union School District, Fremont Union High School District and Foothill-De Anza Community College District provide nationally acclaimed elementary, secondary and post-secondary education. This group of school districts is one of the primary attractions of Cupertino for home buyers, particularly families with 366 RPC-19 CHAPTER 9 Recreation, Parks and Community Services Element REVISED PUBLIC DRAFT TABLE RPC-2 PROPOSED PARK AND OPEN SPACE ACREAGE ACQUISITION BY AREA Area Existing Park Acres Potential Park Lands DescriptionNeighborhood Park Community Park A-1 A-2 65 5.59 33.00 Reuse Blackberry Farm for Community Park B 28.98 C E-1 9 E-2 6 F-1 1.22 3.5 F-2 29.2 Memorial Park contains Neighborhood Facilities G 2.5 H-1 3 H-2 11.5 I-1 17.2 I-2 13.0 J-1 Neighborhood Park J-2 6 K 2.6 3.5 Neighborhood Park L-1 Neighborhood Park L-2 7 M 1.55 3.5 Neighborhood Park N 1.68 O P-1 3.0 P-2 6.0 Total Existing Park Lands 214.43 Total Prop Parks Land49.0910.5 38.59 Total All Park Lands263.52 367 RPC-20 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT school-age children. While the City is not directly involved in the provision of education, it does control growth and development that can affect schools by increasing student enrollment beyond the means of schools to service them. In turn, it is crucial for the City to continue working directly with the school districts to maintain their current high quality. In addition, the City should continue to coordinate with schools to partner on open space and cultural opportunities for community use. The City is already implementing, and hopes to expand, the field maintenance agreements with schools to allow community use when these facilities are not in use by schools. The City will also explore partner- ships with De Anza College and the school districts to make available their theater, tennis courts and community meet- ing spaces for use by community groups. Library The Cupertino Library, operated by the Santa Clara County Library under the Joint Powers Authority Agreement, is an important community resource. The City continues to contribute to the library’s annual operating costs, which are necessary to implement and enhance services provided by the County Library. In addition, the City built a new 54,000 square foot library in 2004, which replaced an outdated 23,000 square foot library. This new facility was needed to accommodate the needs of the growing community. Cupertino Library is now a key community destination in the Civic Center and runs a variety of reading programs and other community activities. A Civic Center Master Plan is currently being developed to meet the facility and parking needs of the various site elements, including the Library, Library Field, City Hall, Community Hall, and the plaza. 368 RPC-21 CHAPTER 9 Recreation, Parks and Community Services Element REVISED PUBLIC DRAFT LOOKING FORWARD As the Cupertino community grows and changes in age, diversity and ability, the City’s parks and recreation pro- grams will have to adjust to meet those needs. In cases where needed services are not provided by the City, the City will partner with other providers to ensure that commu- nity goals and expectations are met. The City will also have to look for ways to expand and deliver services in a manner that is fiscally-responsible by partnering with public agen- cies, service providers and private development, and look- ing for grants to supplement funding for projects. The City will also have to continually update its portfolio of facilities and recreation services to prioritize programs that are most needed and can serve the community in an equitable man- ner. The City should also explore ways to take advantage of sustainable practices to reduce facility maintenance costs. The following are ways the City will address key challenges and opportunities facing Cupertino: 1. Expand Recreation Facilities. As the City realizes added growth anticipated in Community Vision 2040 it will have to look at expanding facilities and programs. These can be achieved through careful master planning, implementation of a Capital Improvement Program (CIP), and partnering with agencies and private develop- ers to increase park and open space. 2. Equitable Distribution and Access. In the future, the City should look to balancing its recreation facilities so that each neighborhood and special area has easy access to parks and recreation services. Strategies to achieve this include removing physical barriers and improving pedestrian and bicycle paths to such facili- ties, prioritizing areas that are deficient in park space, retrofitting facilities and revising programs to meet com- munity needs. 369 RPC-22 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT 3. Collaboration. The City will rely heavily on partnerships and collaboration with other service providers in sharing facilities and services, and ensuring that City plans meet the community’s current and future needs. This will allow the City to deliver services in a manner that is efficient and fiscally responsible. 4. Sustainability. The City should explore ways to rede- velop, build and maintain facilities and parks in an environmentally sustainable manner. Such practices will allow the City to reduce maintenance costs for build- ings and landscaping, while also improving community health. 5. Funding. The City should continue to explore ways to deliver services in a fiscally responsible manner by iden- tifying new sources of funding through grants, working with developers to expand facilities and services, shar- ing facilities with other agencies and school districts, and reviewing recreation programs to ensure that they meet demand. 370 RPC-23 CHAPTER 9 Recreation, Parks and Community Services Element REVISED PUBLIC DRAFT GOALS AND POLICIES The goals and policies in this section provide guidance on how the City can continue to serve the needs of the com- munity through the growth and change in the horizon of Community Vision 2040. Parks and Open Space Parks and open space policies outline acquisition, develop- ment, distribution, access and maintenance of parkland in Cupertino in order to ensure that all residents enjoy easy access to these areas. Policy RPC-1.1: Parks and Recreation Master Plan Prepare a citywide Parks and Recreation Master Plan that outlines policies and strategies to plan for the communities open space and recreational needs. Strategy RPC-1.1.1: Stevens Creek Corridor Master Plan. Prepare a master plan for the park and open space corridor along Stevens Creek including McClellan Ranch, McClellan Ranch West, Blackberry Farm, the Blackberry Farm golf course, Stocklmeir and Blesch properties and the Nathan Hall Tank House area. The plan should address a fiscally sustainable strategy that allows year-round community use of the park system, while preserving the areas natural resources and addressing neighborhood issues including connectivity and buffers. Strategy RPC-1.1.2: Civic Center Master Plan. Prepare a master plan that addresses the needs of the elements in GOAL RPC-1 CREATE A FULL RANGE OF PARK AND RECREATIONAL RESOURCES AND PRESERVE NATURAL RESOURCES 371 RPC-24 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT the Civic Center area including City Hall, Community Hall, Library Field, Library programming, function and meeting space and community gathering space and parking needs. Policy RPC-1.2: Parkland Standards. Continue to implement a parkland acquisition and implementation program that provides a minimum of three acres per 1,000 residents. Strategy RPC-1.2.1: Park Size. Require target for parks based on function and activity supported as part of the Parks and Recreation Master Plan. While the preferred size for most neighborhood parks is about 3.5 acres for flexibility of use, smaller size parks may be considered based on opportunities and circumstances. Strategy RPC-1.2.2: Amend Parkland Standard. Explore increasing the parkland standard to five acres per 1,000 residents as part of the citywide Parks and Recreation Master Plan. Policy RPC-1.3: Capital Improvement Program (CIP) Ensure that CIP projects reflect the goals and policies iden- tified in Community Vision 2040, establishing a criteria for ranking CIP proposals for the highest and best selection of community projects. 372 RPC-25 CHAPTER 9 Recreation, Parks and Community Services Element REVISED PUBLIC DRAFT Policy RPC-2.1: Parkland Acquisition The City’s parkland acquisition strategy should be based upon three broad objectives: • Distributing parks equitably throughout the City; • Connecting and providing access by providing paths, improved pedestrian and bike connectivity and signage; and • Retaining and restoring creeks and other natural open space areas. Strategy RPC-2.1.1: Dedication of Parkland. New developments, in areas where parkland deficiencies have been identified, should be required to dedicate parkland rather than paying in-lieu fees. Strategy RPC-2.1.2: Public Use of School Sites. Zone all public school sites for public use to allow for the public to use sites, when not in use by schools, through shared arrangements. Strategy RPC-2.1.3: Acquisition of Surplus Properties. Explore acquisition of surplus school and agency properties for parkland. Take advantage of the Naylor Act to purchase surplus school sites. GOAL RPC-2 DISTRIBUTE PARKS AND OPEN SPACE THROUGHOUT THE COMMUNITY AND PROVIDE SERVICES, AND SAFE AND EASY ACCESS, TO ALL RESIDENTS AND WORKERS 373 RPC-26 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Policy RPC-2.2: Private Open Space and Recreation Facilities Encourage the continued existence and profitability of pri- vate open space and recreation facilities through incentives and development controls. Strategy RPC-2.2.1: Existing Facilities. Encourage the continued existence of private recreational facilities through land use zoning and incentives. Strategy RPC-2.2.2: New Facilities. Require major developments to incorporate private open space and recreational facilities, and seek their cooperation in making the spaces publicly-accessible. • Where feasible, ensure park space is publicly-accessible (as opposed to private space). • Encourage active areas to serve community needs. However, a combination of active and passive areas can be provided based on the setting. • Integrate park facilities into the surroundings. • If public parkland is not dedicated, require park fees based on a formula that considers the extent to which the publicly-accessible facilities meet community need. Policy RPC-2.3: Parkland Distribution Strive for an equitable distribution of parks and recreational facilities throughout the city. Park acquisition should be based on the following priority list. Accessibility to parks should be a component of the acquisition plan. • High Priority: Parks in neighborhoods or areas that have few or no park and recreational areas. • Medium Priority: Parks in neighborhoods that have other agency facilities such as school fields and district facilities, but no City parks. 374 RPC-27 CHAPTER 9 Recreation, Parks and Community Services Element REVISED PUBLIC DRAFT • Low Priority: Neighborhoods and areas that have park and recreational areas which may be slightly less than the adopted City’s parkland standard. • Private Development: Consider pocket parks in new and renovated projects to provide opportunities for publicly-accessible park areas. Policy RPC-2.4: Connectivity and Access Ensure that each home is within a half-mile walk of a neighborhood park or community park with neighborhood facilities; ensure that walking and biking routes are reason- ably free of physical barriers, including streets with heavy traffic; provide pedestrian links between parks, wherever possible; and provide adequate directional and site signage to identify public parks. Strategy RPC-2.4.1: Pedestrian and Bike Planning. Implement recommendations in the Bicycle and Pedestrian Plans to link employment and special areas, and neighborhood to services including parks, schools and neighborhood shopping. Strategy RPC-2.4.2: Signage. Adopt and maintain a master signage plan for all public parks to ensure adequate and consistent signage is provided to identify public recreational areas. Policy RPC-2.5: Range of Park Amenities Provide parks and recreational facilities for a variety of rec- reational activities. Strategy RPC-2.5.1: Special Needs. Extend recreational opportunities for special needs groups (seniors, disabled, visually-challenged, etc.) by making improvements to existing facilities and trails. 375 RPC-28 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Strategy RPC-2.5.2: Recreational Facilities. Explore the possibility of providing additional access to existing facilities such as gymnasiums, swimming pools and tennis courts. Policy RPC-3.1: Preservation of Natural Areas Design parks to utilize natural features and the topography of the site in order to protect natural features and keep maintenance costs low. Strategy RPC-3.1.1: Native Planting. Maximize the use of native plants and drought-tolerant planting. Strategy RPC-3.1.2: Natural Habitat. Where possible, restore and provide access to creeks and riparian habitat. Strategy RPC-3.1.3: Nature Play Areas. Where appropriate, consider establishing Nature Play Areas in lieu of the more conventional play equipment. Policy RPC-4.1: Recreational Intensity Design parks appropriately to address the facility and rec- reational programming required by each special area and neighborhood based on current and future plans for the areas. GOAL RPC-3 PRESERVE AND ENHANCE ACCESS TO PARKS THAT HAVE SIGNIFICANT NATURAL RESOURCES GOAL RPC-4 INTEGRATE PARKS AND PUBLIC FACILITIES WITHIN NEIGHBORHOODS AND AREAS 376 RPC-29 CHAPTER 9 Recreation, Parks and Community Services Element REVISED PUBLIC DRAFT Policy RPC-4.2: Park Safety Design parks to enhance public safety by providing visibility to the street and access for public safety responders. Trails Trails policies encourage the provision of a system of linear connections along creeks, utility rights-of-way and other corridors in order to provide recreational opportunities, improve pedestrian and bicycle access throughout the city, improve safety, and preserve natural resources. Policy RPC-5.1: Open Space and Trail Linkages Dedicate or acquire open space land along creeks and utility through regional cooperation, grants and private development review. Strategy RPC-5.1.1: Pedestrian and Bike Planning. Implement recommendations in the Bicycle and Pedestrian Plan that link trails and open space to neighborhoods and special areas. Strategy RPC-5.1.2: Trail Projects. Implement trail projects described in this Element; evaluate any safety, security and privacy impacts and mitigations associated with trail development; and work with affected neighbors in locating trails to ensure that their concerns are appropriately addressed. GOAL RPC-5 CREATE AN INTERCONNECTED SYSTEM OF MULTI-USE TRAILS AND PROVIDE SAFE PEDESTRIAN AND BICYCLE ACCESS THROUGH THE CITY AND CONNECTIONS TO LOCAL NODES AND DESTINATIONS 377 RPC-30 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Strategy RPC-5.1.3: Dedicated Trail Easements. Require dedication or easements for trails, as well as their implementation, as part of the development review process, where appropriate. Strategy RPC-5.1.4: Joint Use Agreement. Establish a Joint Use Agreement with the Santa Clara Valley Water District that allows cooperation on implementing the trail program with set standards and implementation measures for creek trails. Policy RPC-5.2: Pedestrian and Bicycle Paths Develop a citywide network of pedestrian and bicycle pathways to connect employment centers, shopping areas and neighborhoods to services including parks, schools and neighborhood centers. Recreation Programs and Services Recreation programs and services policies provide guidance for the implementation of programs that serve the changing and growing needs of the community in order to ensure an exceptional quality of life. Policy RPC-6.1: Diverse Programs Ensure that the City continues to offer a wide range of pro- grams to serve diverse populations of all ages and abilities. GOAL RPC-6 CREATE AND MAINTAIN A BROAD RANGE OF RECREATION PROGRAMS AND SERVICES THAT MEET THE NEEDS OF A DIVERSE POPULATION 378 RPC-31 CHAPTER 9 Recreation, Parks and Community Services Element REVISED PUBLIC DRAFT Policy RPC-6.2: Partnerships Enhance the city’s recreational programs through partner- ships with other agencies and non-profit organizations. Policy RPC-6.3: Art and Culture Utilize parks as locations of art and culture and to educate the community about the city’s history, and explore the potential to use art in facilities and utilities when located in parks. Policy RPC-7.1: Sustainable Design Ensure that City facilities are sustainably designed to mini- mize impacts on the environment. Policy RPC-7.2: Flexibility Design facilities to be flexible to address changing com- munity needs. Policy RPC-7.3: Maintenance Design facilities to reduce maintenance, and ensure that facilities are maintained and upgraded adequately. GOAL RPC-7 PROVIDE HIGH-QUALITY, FLEXIBLE AND WELL-MAINTAINED COMMUNITY FACILITIES THAT MEET THE CHANGING NEEDS OF THE COMMUNITY AND ARE A SOURCE OF COMMUNITY IDENTITY 379 RPC-32 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Community Services Community services policies seek to enhance the quality of community services through partnerships and information sharing with providers. Policy RPC-8.1: School Districts Partner with school districts to allow community use of their sports fields and facilities. Strategy RPC-8.1.1: Shared Facilities. Maintain and enhance arrangements with schools for the use of sports fields, theaters, meeting spaces and other facilities through maintenance agreements and other partnerships. Strategy RPC-8.1.2: School Expansion. Encourage schools to meet their expansion needs without reducing the size of their sports fields. Strategy RPC-8.1.3: School Facility Needs. Collaborate with schools on their facility needs through sharing of development information and partnerships through major development projects. GOAL RPC-8 COOPERATE WITH SCHOOL DISTRICTS TO SHARE FACILITIES AND MEET COMMUNITY NEEDS 380 SECTION 3 Housing LAND USE DEFINITIONS Appendix A A 381 A-2 Housing Commission Attachment B 382 Appendix A Land Use Definitions A-3REVISED PUBLIC DRAFT INTRODUCTION The Land Use Map (Figure A-1) of Community Vision 2040 illustrates the policies in this element and in other elements that play a major role in guiding urban development. The map cannot be used alone because it illustrates the text, which should be used along with it. The Land Use Map illustrates the general form of Cupertino in terms of land use patterns and intensity of land use activities. In contrast, the Municipal Zoning Map divides the city into very precisely drawn land use categories. Zoning districts have precisely written standards governing permitted activities and development forms. A series of policy statements accompany the planning text to guide the public and government officials in establishing precise zoning boundaries and pinpoint permitted activities. California law requires that the zoning map and zoning regulations be consistent with the Land Use Map and text. The zoning map and regulations must be brought into conformity with Community Vision 2040 within a reasonable period after it is adopted. CONTENTS A-3 Introduction A-4 Land Use Categories Residential Commercial/Residential Neighborhood Commercial/Residential Office Commercial/Office/ Residential Industrial/Residential Office/Industrial/ Commercial/Residential Quasi-Public/Institutional Parks and Open Space Riparian Corridor Public Facilities Transportation Monta Vista Neighborhood Land Use Designation 383 COMMUNITY VISION 2040 City of Cupertino A-4 REVISED PUBLIC DRAFT LAND USE CATEGORIES Patterns and symbols, defined on the map legend, are used on the Land Use Map to identify land use categories, the road system, major land features and significant public and private facilities. The following is a description of each land use category: Residential Areas suitable for dwellings, divided into five sub- categories based on dwelling unit density and expressed as the number of dwellings permitted on each acre. Maximum residential yield is calculated by multiplying the maximum dwelling unit density by the size of the lot in acres, excluding any public rights-of-way. Community Vision 2040 does not define whether the dwellings are to be owned or rented by their inhabitants or whether they are to be attached or detached. Very Low Density: Intensity is based on applying one of four slope-density formula—Foothill Modified, Foothill Modified l/2 Acre, Semi-Rural 5 acre or Foothill 5-20 acre. This classification is intended to protect environmentally sensitive areas from extensive development and to protect human life from hazards related to flood, fire and unstable terrain. Low Density: 1-5 and 1-6 units on each acre. This category is intended to promote a suburban lifestyle of detached single-family homes. Planned residential communities can be incorporated into this category if the development form is compatible with adjoining residential development. Low/Medium Density: 5-10 units per acre. This category accommodates more intensive forms of residential development while still being compatible with the predominant single-family detached residential 384 Appendix A Land Use Definitions A-5REVISED PUBLIC DRAFT neighborhood. This development can be successfully incorporated into a single-family environment. Medium Density: 10-20 units per acre. This category provides greater opportunity for multiple-family residential developments in a planned environment. This range usually results in traffic volumes and buildings that are not compatible with single-family residential neighborhoods. These developments should be located on the edges of single-family residential communities where utility services and street networks are adequate to serve increased densities. Medium-High Density: 20-35 units per acre. This promotes a wide range of housing choices in multiple- family dwellings. The intensity requires that the category be used in corridors with access to services and transit. The development may result in structures with three or four levels and underground parking. This category offers opportunity for housing choice, especially for people who want a more urban environment. High Density: 20-35 units per acre. This promotes a wide range of housing choices in multiple-family dwellings. The intensity requires that the category be used only at locations with adequate utility services or transit or both. The development may result in structures with three or four levels and underground parking. This category offers maximum opportunity for housing choice, especially for people who want a city environment. Commercial/Residential This designation allows primarily commercial uses and secondarily residential uses or a compatible combination 385 COMMUNITY VISION 2040 City of Cupertino A-6 REVISED PUBLIC DRAFT of the two. Commercial use means retail sales, businesses, limited professional offices, and service establishments with direct contact with customers. This applies to commercial activities ranging from neighborhood convenience stores to regionally oriented specialty stores. Retail stores that would be a nuisance for adjoining neighborhoods or harmful to the community identity would be regulated by the commercial zoning ordinance and use permit procedure. Smaller commercial parcels in existing residential areas may be needed to provide local neighborhood serving retail; otherwise they may be redeveloped at residential densities compatible with the surroundings. Residential development is subject to the numerical caps and other policies described in the development priorities tables. Neighborhood Commercial/Residential Neighborhood Commercial is a subset of the Commercial land use designation. This category includes retail activities, personal services and limited commercial offices that serve primarily the residents of adjacent neighborhoods. Residential living units may only be allowed as upper floor uses. Office This designation encompasses all office uses referenced in the City’s Administrative and Professional Office Zone including administrative, professional and research and development activities. Prototype research and development is permitted if it is conducted along with the office functions of a business. Prototype R&D is defined as research and development activities that lead to the development of a new product or a new manufacturing and assembly process. Products 386 Appendix A Land Use Definitions A-7REVISED PUBLIC DRAFT developed, manufactured or assembled here are not intended to be mass-produced for sale at this location. Guidelines for Prototype Research and Development: The type, use and storage of hazardous material for prototype R&D or assembly is regulated by the Uniform Building Code, the Uniform Fire Code and any new ordinance or other regulation that controls hazardous materials. The building must not present the appearance that a prototype R&D or assembly process is in place. There will be no exterior storage and receiving facilities will be small. Generally, no more than 25 percent of the total space occupied by the firm will be devoted to this activity. Commercial/Office/Residential This designation applies to the mixed-use areas that are predominantly commercial and office uses. Supporting residential uses may be allowed to offset job growth, better balance the citywide jobs to housing ratio and when they are compatible with the primarily non-residential character of the area. Residential development is subject to the numerical caps and other policies (described in the Land Use and Community Design element). Industrial/Residential This designation allows primarily industrial uses and secondarily residential uses or a compatible combination of the two. Industrial use refers to manufacturing, assembly and research and development. Administrative offices that support manufacturing and wholesaling are included. Housing may be allowed to offset job growth and better balance citywide jobs to housing ratio. Residential development is subject to the numerical caps and other 387 COMMUNITY VISION 2040 City of Cupertino A-8 REVISED PUBLIC DRAFT policies (described in the Land Use and Community Design Element). Office/Industrial/Commercial/Residential This designation applies to areas that are primarily office uses and industrial uses. Commercial uses should be ancillary and supportive of the office and industrial base with the exception of larger parcels, which may be used for regionally oriented stores. Residential development is subject to the numerical caps and other policies (described in the Land Use and Community Design Element). Quasi-Public/Institutional This designation is applied to privately owned land involving activities such as a private utility, a profit or non- profit facility giving continuous patient care, an educational facility or a religious facility. Parks and Open Space This designation is applied to land owned by the public and used for recreation. It is also applied to private open space and recreational lands. Riparian Corridor This designation is applied to creek corridors if they are not part of a larger park or residential property. Public Facilities This designation is applied to land used or planned to be used by a governmental entity for a public purpose. Transportation This designation is applied to streets, highways and rail corridors. 388 Appendix A Land Use Definitions A-9REVISED PUBLIC DRAFT Monta Vista Neighborhood Land Use Designation Residential: The Monta Vista neighborhood has three density ranges, which allow single family, duplex and multi-family housing types. Non-residential: The non-residential designations are the same as the rest of Cupertino. 389 LAND USE DEFINITIONS SECTION 3 Housing AIR QUALITY Appendix C 390 C-2 Housing Commission Attachment B 391 Appendix C Air Quality C-3REVISED PUBLIC DRAFT PRINCIPAL POLLUTANTS OF THE AIR BASIN A substance in the air that can cause harm to humans and the environment is known as an air pollutant. Pollutants can be in the form of solid particles, liquid droplets, or gases. In addition, they may be natural or man-made. Pollutants can be classified as primary or secondary. Usually, primary pollutants are directly emitted from a process, such as ash from a volcanic eruption, carbon monoxide gas from a motor vehicle exhaust, or sulfur dioxide released from factories. Secondary pollutants are not emitted directly. Rather, they form in the air when primary pollutants react or interact. Criteria Air Pollutants Pollutants emitted into the ambient air by stationary and mobile sources are regulated by Federal and State law. Air pollutants are categorized as primary and/or secondary pollutants. Primary air pollutants are emitted directly from sources, and include carbon monoxide (CO), reactive organic gases (ROG), nitrogen oxides (NOx), sulfur dioxide (SO2), coarse inhalable particulate matter (PM10), fine inhalable particulate matter (PM2.5), and lead (Pb). Of these, CO, SO2, NO2, PM10, and PM2.5 are “criteria air pollutants,” which means that ambient air quality standards (AAQS) have been established for them. ROG and NOx are criteria pollutant precursors that form secondary criteria air pollutants through chemical and photochemical reactions in the atmosphere. Ozone (O3) and nitrogen dioxide (NO2) are the principal secondary pollutants. The following is a description of each of the primary and secondary criteria air pollutants and their known health effects. CONTENTS C-1 Principal Pollutants of the Air Basin 392 COMMUNITY VISION 2040 City of Cupertino C-4 REVISED PUBLIC DRAFT Carbon Monoxide Carbon Monoxide (CO) is a colorless, odorless, toxic gas produced by incomplete combustion of carbon substances, such as gasoline or diesel fuel. CO concentrations tend to be the highest during winter mornings with little or no wind, when surface-based inversions trap the pollutant at ground levels. Because CO is emitted directly from internal combustion engines, motor vehicles operating at slow speeds are the primary source of CO in the Air Basin. Emissions are highest during cold starts, hard acceleration, stop-and-go driving, and when a vehicle is moving at low speeds. New findings indicate that CO emissions per mile are lowest at about 45 miles per hour (mph) for the average light-duty motor vehicle and begin to increase again at higher speeds. When inhaled at high concentrations, CO combines with hemoglobin in the blood and reduces its oxygen-carrying capacity. This results in reduced oxygen reaching the brain, heart, and other body tissues. This condition is especially critical for people with cardiovascular diseases, chronic lung disease, or anemia, as well as for fetuses. Even healthy people exposed to high CO concentrations can experience headaches, dizziness, fatigue, unconsciousness, and even death. The Air Basin is designated under the California and National AAQS as being in attainment of CO criteria levels. Reactive Organic Gases Reactive Organic Gases (ROGs) are compounds composed primarily of hydrogen and carbon atoms. Internal combustion associated with motor vehicle usage is the major source of ROGs. Other sources of ROGs include evaporative emissions from paints and solvents, the application of asphalt paving, and the use of household consumer 393 Appendix C Air Quality C-5REVISED PUBLIC DRAFT products such as aerosols. Adverse effects on human health are not caused directly by ROGs, but rather by reactions of ROGs to form secondary pollutants such as O3. There are no AAQS established for ROGs. However, because they contribute to the formation of O3, BAAQMD has established a significance threshold for this pollutant. Nitrogen Oxides Nitrogen Oxides (NOx) are a by-product of fuel combustion and contribute to the formation of O3, PM10, and PM2.5. The two major components of NOx are nitric oxide (NO) and nitrogen dioxide (NO2). The principal component of NOx produced by combustion is NO, but NO reacts with oxygen to form NO2, creating the mixture of NO and NO2 commonly called NOx. NO2 acts as an acute irritant and in equal concentrations is more injurious than NO. At atmospheric concentrations, however, NO2 is only potentially irritating. There is some indication of a relationship between NO2 and chronic pulmonary fibrosis. Some increase in bronchitis in children (two and three years old) has also been observed at concentrations below 0.3 ppm. NO2 absorbs blue light; the result is a brownish-red cast to the atmosphere and reduced visibility. NO is a colorless, odorless gas formed from atmospheric nitrogen and oxygen when combustion takes place under high temperature and/ or high pressure. The Air Basin is designated an attainment area for NO2 under the National AAQS and California AAQS. Sulfur Dioxide Sulfur Dioxide (SO2) is a colorless, pungent, irritating gas formed by the combustion of sulfurous fossil fuels. It enters the atmosphere as a result of burning high-sulfur-content fuel oils and coal and from chemical processes at chemical plants and refineries. Gasoline and natural gas have very 394 COMMUNITY VISION 2040 City of Cupertino C-6 REVISED PUBLIC DRAFT low sulfur content and do not release significant quantities of SO2. When SO2 forms sulfates (SO4) in the atmosphere, together these pollutants are referred to as sulfur oxides (SOx). As a result, SO2 is both a primary and secondary criteria air pollutant. At sufficiently high concentrations, SO2 may irritate the upper respiratory tract. At lower concentrations and when combined with particulates, SO2 may do greater harm by injuring lung tissue. The Air Basin is designated an attainment area for SO2 under the California and National AAQS Suspended Particulate Matter Suspended Particulate Matter (PM10 and PM2.5) consists of finely divided solids or liquids such as soot, dust, aerosols, fumes, and mists. Two forms of fine particulates are now recognized and regulated. Inhalable coarse particles, or PM10, include the particulate matter with an aerodynamic diameter of 10 microns (i.e., 10 millionths of a meter or 0.0004-inch) or less. Inhalable fine particles, or PM2.5, have an aerodynamic diameter of 2.5 microns or less (i.e., 2.5 millionths of a meter or 0.0001 inch). Some particulate matter, such as pollen, occurs naturally. In the Air Basin most particulate matter is caused by combustion, factories, construction, grading, demolition, agricultural activities, and motor vehicles. Extended exposure to particulate matter can increase the risk of chronic respiratory disease. PM10 bypasses the body’s natural filtration system more easily than larger particles and can lodge deep in the lungs. The U.S. Environmental Protection Agency (USEPA) scientific review concluded that PM2.5 penetrates even more deeply into the lungs, and this is more likely to contribute to health effects—at concentrations well below current PM10 standards. These health effects include premature death in people 395 Appendix C Air Quality C-7REVISED PUBLIC DRAFT with heart or lung disease, nonfatal heart attacks, irregular heartbeat, aggravated asthma, decreased lung function, increased respiratory symptoms (e.g., irritation of the airways, coughing, or difficulty breathing). Motor vehicles are currently responsible for about half of particulates in the Air Basin. Wood burning in fireplaces and stoves is another large source of fine particulates. Both PM10 and PM2.5 may adversely affect the human respiratory system, especially in people who are naturally sensitive or susceptible to breathing problems. These health effects include premature death and increased hospital admissions and emergency room visits (primarily the elderly and individuals with cardiopulmonary disease); increased respiratory symptoms and disease (children and individual with asthma); and alterations in lung tissue and structure and in respiratory tract defense mechanisms. Diesel particulate matter (DPM) is classified a carcinogen by the California Air Resources Board (CARB). The Air Basin is designated nonattainment under the California AAQS for PM10 and nonattainment under both the California and National AAQS for PM2.5. Ozone Ozone (O3) is commonly referred to as “smog” and is a gas that is formed when ROGs and NOx, both by-products of internal combustion engine exhaust, undergo photochemical reactions in the presence of sunlight. O3 is a secondary criteria air pollutant. O3 concentrations are generally highest during the summer months when direct sunlight, light winds, and warm temperatures create favorable conditions to the formation of this pollutant. O3 poses a health threat to those who already suffer from respiratory diseases as well as to healthy people. O3 levels usually build up during the day and peak in the afternoon hours. Short-term exposure can irritate the eyes and cause constriction of the airways. 396 COMMUNITY VISION 2040 City of Cupertino C-8 REVISED PUBLIC DRAFT Besides causing shortness of breath, it can aggravate existing respiratory diseases such as asthma, bronchitis, and emphysema. Chronic exposure to high ozone levels can permanently damage lung tissue. O3 can also damage plants and trees and materials such as rubber and fabrics. The Air Basin is designated nonattainment of the 1-hour California AAQS and 8-hour California and National AAQS for O3. Lead Lead (Pb) is a metal found naturally in the environment as well as in manufactured products. The major sources of lead emissions have historically been mobile and industrial sources. As a result of the phase-out of leaded gasoline, metal processing is currently the primary source of lead emissions. The highest levels of lead in air are generally found near lead smelters. Other stationary sources are waste incinerators, utilities, and lead-acid battery manufacturers. Twenty years ago, mobile sources were the main contributor to ambient lead concentrations in the air. In the early 1970s, the EPA set national regulations to gradually reduce the lead content in gasoline. In 1975, unleaded gasoline was introduced for motor vehicles equipped with catalytic converters. The EPA banned the use of leaded gasoline in highway vehicles in December 1995. As a result of the EPA’s regulatory efforts to remove lead from gasoline, emissions of lead from the transportation sector and levels of lead in the air decreased dramatically. The Air Basin is designated in attainment of the California and National AAQS for lead. Toxic Air Contaminants Public exposure to TACs is a significant environmental health issue in California. In 1983, the California Legislature enacted a program to identify the health effects of TACs and to reduce exposure to these contaminants to protect the public health. The California Health and Safety Code define a TAC 397 Appendix C Air Quality C-9REVISED PUBLIC DRAFT as “an air pollutant which may cause or contribute to an increase in mortality or in serious illness, or which may pose a present or potential hazard to human health.” A substance that is listed as a hazardous air pollutant pursuant to Section 112(b) of the Federal Clean Air Act (42 U.S. Code Section 7412[b]) is a toxic air contaminant. Under State law, the California Environmental Protection Agency (Cal/EPA), acting through CARB, is authorized to identify a substance as a TAC if it is an air pollutant that may cause or contribute to an increase in mortality or serious illness, or may pose a present or potential hazard to human health. California regulates TACs primarily through AB 1807 (Tanner Air Toxics Act) and AB 2588 (Air Toxics “Hot Spot” Information and Assessment Act of 1987). The Tanner Air Toxics Act sets up a formal procedure for CARB to designate substances as TACs. Once a TAC is identified, CARB adopts an “airborne toxics control measure” for sources that emit designated TACs. If there is a safe threshold for a substance (i.e. a point below which there is no toxic effect), the control measure must reduce exposure to below that threshold. If there is no safe threshold, the measure must incorporate toxics best available control technology to minimize emissions. To date, CARB has established formal control measures for 11 TACs that are identified as having no safe threshold. Air toxics from stationary sources are also regulated in California under the Air Toxics “Hot Spot” Information and Assessment Act of 1987. Under AB 2588, TAC emissions from individual facilities are quantified and prioritized by the air quality management district or air pollution control district. High priority facilities are required to perform a health risk assessment (HRA), and if specific thresholds are exceeded, are required to communicate the results to the public through notices and public meetings. 398 COMMUNITY VISION 2040 City of Cupertino C-10 REVISED PUBLIC DRAFT At the time of the last update to the TAC list in December 1999, CARB had designated 244 compounds as TACs. Additionally, CARB has implemented control measures for a number of compounds that pose high risks and show potential for effective control. The majority of the estimated health risks from TACs can be attributed to relatively few compounds, the most important being particulate matter from diesel-fueled engines. In 1998, CARB identified diesel particulate matter (DPM) as a TAC. Previously, the individual chemical compounds in diesel exhaust were considered TACs. Almost all diesel exhaust particles are 10 microns or less in diameter. Because of their extremely small size, these particles can be inhaled and eventually trapped in the bronchial and alveolar regions of the lungs. 399 SECTION 3 Housing COMMUNITY NOISE FUNDAMENTALS Appendix D 400 C-2 Housing Commission Attachment B 401 Appendix D Community Noise Fundamentals D-3REVISED PUBLIC DRAFT BACKGROUND Three aspects of community noise are important in determining subjective response: Level (i.e., magnitude or loudness) of the sound; The frequency composition or spectrum of the sound; and The variation in sound level with time. Airborne sound is a rapid fluctuation of air pressure and local air velocity. Sound levels are measured and expressed in decibels (dB) with 0 dB roughly equal to the threshold of hearing. The frequency of a sound is a measure of the pressure fluctuations per second measured in units of hertz (Hz). Most sounds do not consist of a single frequency, but are comprised of a broad band of frequencies differing in level. The characterization of sound level magnitude with respect to frequency is the sound spectrum. A sound spectrum is often described in octave bands that divide the audible human frequency range (i.e., from 20 to 20,000 Hz) into ten segments. FREQUENCY WEIGHTING Many rating methods exist to analyze sound of different spectra. The simplest method is generally used so that measurements may be made and noise impacts readily assessed using basic acoustical instrumentation. This method evaluates all frequencies by using a single weighting filter that progressively de-emphasizes frequency components below 1000 Hz and above 5000 Hz. This frequency weighting reflects the relative decreased human sensitivity to low frequencies and to extreme high frequencies. This weighting is called A-weighting and is CONTENTS D-3 Background D-3 Frequency Weighing D-4 Noise Exposure D-5 Subjective Response to Noise D-6 Noise Monitoring Summary D-10 Principle Noise Sources In Cupertino 402 COMMUNITY VISION 2040 City of Cupertino D-4 REVISED PUBLIC DRAFT applied by an electrical filter in all U.S. and international standard sound level meters. NOISE EXPOSURE Noise exposure is a measure of noise over a period of time, whereas noise level is a single value at an instant in time. Although a single sound level may adequately describe community noise at any instant in time, community noise levels vary continuously. Most community noise is produced by many distant noise sources that produce a relatively steady background noise having no identifiable source. These distant sources change gradually throughout the day and include traffic, wind in trees, and distant industrial activities. Superimposed on this slowly varying background is a succession of identifiable noise events of brief duration. These include nearby activities such as single vehicle passbys or aircraft flyovers, which cause the community noise level to vary from instant to instant. A single number called the equivalent sound level or Leq is used to describe noise varying over a period of time. The Leq is the average noise exposure level over a period of time (i.e., the total sound energy divided by the duration). It is the constant sound level, which would contain the same acoustic energy as the varying sound level, during the same time period. The Leq is useful in describing noise over a period of time with a single numerical value. In determining the daily measure of community noise, it is important to account for the difference in human response to daytime and nighttime noise. During the nighttime, exterior background noise levels are generally lower than in the daytime. Most household noise also decreases at night, and exterior noise intrusions become more noticeable. People are more sensitive to noise at night than during other periods of the day. 403 Appendix D Community Noise Fundamentals D-5REVISED PUBLIC DRAFT To account for human sensitivity to nighttime noise, the Community Noise Equivalent Level (CNEL) is the adopted standard in California. CNEL values are typically computed by energy summation of hourly noise level values, with the proper adjustment applied for the period of evening or night. The CNEL is computed by assessing a 5-dB penalty for evening (i.e., 7:00 pm to 10:00 pm) noise and a 10-dB penalty for nighttime (i.e., 10:00 pm to 7:00 am) noise. Noise exposure measures such as Leq and CNEL are A-weighted, with units expressed in decibels (i.e., dB). SUBJECTIVE RESPONSE TO NOISE The effects of noise on people can be classified into three general categories: 1. Subjective effects of annoyance, nuisance, dissatisfaction. 2. Interference with activities such as speech, sleep, and learning. 3. Physiological effects such as anxiety or hearing loss. The sound levels associated with community noise usually produce effects only in the first two categories. No universal measure for the subjective effects of noise has been developed, nor does a measure exist for the corresponding human reactions from noise annoyance. This is primarily due to the wide variation in individual attitude regarding the noise source(s). An important factor in assessing a person’s subjective reaction is to compare the new noise environment to the existing noise environment. In general, the more a new noise exceeds the existing, the less acceptable it is. Therefore, a new noise source will be judged more annoying in a quiet area than it would be in a noisier location. 404 COMMUNITY VISION 2040 City of Cupertino D-6 REVISED PUBLIC DRAFT Knowledge of the following relationships is helpful in understanding how changes in noise and noise exposure are perceived. Except under special conditions, a change in sound level of 1 dB cannot be perceived. Outside of the laboratory, a 3-dB change is con sidered a just-noticeable difference. A change in level of at least 5 dB is required before any noticeable change in community response would be expected. A 10-dB change is subjectively heard as an approx imate doubling in loudness and almost always causes an adverse community response. NOISE MEASUREMENTS Existing ambient noise levels were measured at 15 sites around Cupertino to document representative noise levels at a variety of locations. These locations are shown on Figure D-1. Short-term noise level measurements were taken at 13 locations for a minimum period of 15 minutes during the daytime on Tuesday, April 22 and Wednesday, April 23, 2014, between the hours of 8:00 a.m. and 7:00 p.m. Short-term noise measurements serve as a snapshot of noise levels at a particular time and location, offering a sense of how other, similar locations might experience noise during comparable times of day. Long-term noise level measurements were taken at two locations for a period of 24 hours between April 22 and 23, 2014. Long-term noise level measurements serve to provide a broader picture of how noise levels vary over the course of a full day, helping to put the short-term measurements in a broader temporal context. Both long- and short-term 405 Appendix D Community Noise Fundamentals D-7REVISED PUBLIC DRAFT measurements serve to indicate where excessive noise may be an existing or future issue for existing or new land uses. As shown in Table D-1, noise levels at the short-term measurement locations ranged from a minimum of 58.4 dBA Leq at Location 4 to a maximum of 71.4 dBA Leq at Location 3, with an average Leq of 66.2 dBA, and the majority locations falling between 65 and 70 dBA Leq. Noise levels tended to be higher adjacent to major roadways and freeway, where high volumes of traffic were the dominant source of noise. Noise levels were measured using a Larson-Davis Model 820 sound level meter, which satisfies the American National Standards Institute for Type 1 general environmental noise measurement instrumentation. The sound level meter and microphone were mounted on a tripod 5 feet above the ground and equipped with a windscreen during all short-term measurements. For long- term measurements, the microphone and windscreen were attached to available objects, at a height between four and six feet, as dictated by conditions in the field. The sound level meters were programmed to record noise levels with the “slow” time constant and using the “A” weighting filter network. Meteorological conditions during the measurement periods were favorable and were noted to be representative of typical conditions for the season. Generally, conditions included clear to partly cloudy skies, daytime temperatures of approximately 57 to 78 degrees Fahrenheit, and less than 5 to 10 mile-per-hour winds, with occasional higher gusts noted at certain sites. The short- and longterm noise measurement locations are described below. Table D-1 summarizes the results of both the short- and long-term noise monitoring. 406 COMMUNITY VISION 2040 City of Cupertino D-8 REVISED PUBLIC DRAFT TABLE D-1 NOISE MONITORING SUMMARY Location Duration Noise Level ST-1 15 minutes 68.9 dBA Leq ST-2 15 minutes 68.8 dBA Leq ST-3 15 minutes 71.4 dBA Leq ST-4 15 minutes 58.4 dBA Leq ST-5 15 minutes 67.4 dBA Leq ST-6 15 minutes 61.6 dBA Leq ST-7 15 minutes 67.9 dBA Leq ST-8 15 minutes 68.0 dBA Leq ST-9 15 minutes 67.6 dBA Leq ST-10 15 minutes 58.5 dBA Leq ST-11 15 minutes 70.9 dBA Leq ST-12 15 minutes 64.2 dBA Leq ST-13 15 minutes 67.3 dBA Leq LT-1 24 hours 69.1 dBA Ldn LT-2 24 hours 72.3 dBA Ldn Notes: Noise measurement results printouts included in Appendix E, Noise Data, of this Draft EIR Noise Measurements taken by PlaceWorks on April 22 and 23, 2014. 407 Appendix D Community Noise Fundamentals D-9REVISED PUBLIC DRAFT GF GFGF GF GF GF GF GF GFGF GF GFGF GF GF City of Sunnyvale %&'(280 |ÿ85 City of San Jose City of Santa Clara Santa Clara County City of Los Altos Santa Clara County Monta Vista Recreation Center/Park Linda Vista Park Deep Cliff Golf Course McClellan Ranch Preserve Blackberry Farm Park Somerset Square Park Varian Park Memorial Park Three Oaks Park Hoover Park Jollyman Park Cali Mill Plaza Library Field Wilson Park Creekside Park Portal Park Sterling Barnhart Park Franco Park S B L A N E Y A V E N B L A N E Y A V E RAINBOW DR BOL LINGER RD N S T E L L I N G R D B U B B R D NTANTAU AVE S D E A N Z A B L V D BL A N E Y A V E N FOOTHILL BLV D S S T E L L I N G R D HOMESTEAD RD PR U N ERIDGE AVE MI LL E R A V E STEVENS CREEK BLVD S TANTAU AVE G R A N T R D N D E A N Z A B L V D PROSP E CT RD MCCLELLAN RD N W O L F E R D S W O L F E R D LT-2 LT-1ST-1 ST-2 ST-3 ST-4 ST-5 ST-6 ST-7ST-8 ST-9 ST-10ST-11 ST-12 ST-13 GF Long-term Noise Monitoring Location GF Short-term Noise Monitoring Location Parks City Boundary 00.510.25 Miles Figure D-1 Noise Monitoring Locations 408 COMMUNITY VISION 2040 City of Cupertino D-10 REVISED PUBLIC DRAFT The sound level meters were programmed to record noise levels with the “slow” time constant and using the “A” weighting filter network. Meteorological conditions during the measurement periods were favorable and were noted to be representative of typical conditions for the season. Generally, conditions included clear to partly cloudy skies, daytime temperatures of approximately 57 to 78 degrees Fahrenheit, and less than 5 to 10 mile-per-hour winds, with occasional higher gusts noted at certain sites. The short- and longterm noise measurement locations are described below. PRINCIPAL NOISE SOURCES IN CUPERTINO On-Road Vehicles Freeways that traverse Cupertino include I-280, which runs along and near the City’s northern boundary, and SR 85, which roughly bisects the geographic area of Cupertino, running from northwest to southeast. In addition to these highways, major roadways running north to south through or adjacent to Cupertino include Foothill Boulevard, Bubb Road, Stelling Road, De Anza Boulevard, Blaney Avenue, Wolfe Road/Miller Avenue, and the Lawrence Expressway, just beyond the eastern edge of the City. Major east-west roadways include Stevens Creek Boulevard, McClellan Road, Bollinger Road, Rainbow Drive, and lastly, Homestead Road and Prospect Road, which run along the northern and southern boundaries of the city, respectively. Together, these highways and streets comprise the major roads in the City of Cupertino. 409 Appendix D Community Noise Fundamentals D-11REVISED PUBLIC DRAFT Train Noise Cupertino does not host any passenger rail lines and has only one, seldom-used freight railway. This freight right- of-way is a Union Pacific rail line, which now exclusively serves the Hanson Permanente quarry and cement plant. As described in the General Plan for the City of Cupertino, this railway presently operates at very low frequencies, with approximately three train trips in each direction per week, usually during the daytime or early evening. Therefore, this railway contributes only very minimally to the noise environment of Cupertino. Heliports There are no heliports located within the City of Cupertino listed by the Federal Aviation Administration (FAA). The nearest heliport is located approximately 3.4 miles to the east of Cupertino at the County Medical Center in San Jose. Another nearby heliport is located at McCandless Towers in Sunnyvale, 3.6 miles to the northeast of Cupertino. There are no additional heliports within five miles of Cupertino. Aircraft Noise There are no public or private airports or airstrips in Cupertino. At the nearest points within city boundaries, Cupertino is located approximately 4.0 miles to the southwest of the San Jose International Airport. The Santa Clara County Airport Land Use Commission (ALUC) has adopted a Comprehensive Land Use Plan (CLUP) for areas surrounding San Jose International Airport. The city is not located within any protected airspace zones defined by the ALUC. Cupertino is located approximately 4.4 miles to the south of Moffett Federal Airfield, 8.4 miles to the southeast of the Palo Alto Airport, 24 miles to the southeast of San Francisco International Airport, 410 COMMUNITY VISION 2040 City of Cupertino D-12 REVISED PUBLIC DRAFT and 27 miles to the southeast of Oakland International Airport.5Additional small airports in the vicinity include the San Carlos Airport, 17 miles to the northwest, Hayward Executive Airport, 23 miles to the north-northwest, and the Half Moon Bay airport, 26 miles to the northwest. Although Cupertino does receive some noise from aircraft using these facilities, the Cupertino City Boundary does not fall within the airport land use planning areas/airport influence areas, runway protection zones, or the identified noise contours of any airport. Stationary Source Noise Stationary sources of noise may occur from all types of land uses. Cupertino is mostly developed with residential, commercial, mixed-use, institutional, and some light industrial/research and development uses. Commercial uses can generate noise from HVAC systems, loading docks, trash compactors, and other sources. Industrial uses may generate noise from HVAC systems, loading docks, and machinery required for manufacturing or other industrial processes. Noise generated by commercial uses is generally short and intermittent. Industrial uses may generate noise on a more continual basis, or intermittently, depending on the processes and types of machinery involved. In addition to on-site mechanical equipment, which generates stationary noise, warehousing and industrial land uses generate substantial truck traffic that results in additional sources of noise on local roadways in the vicinity of industrial operations. For Cupertino, the city’s limited industrial areas are primarily located in four areas of the city, the Monta Vista Special Center, the Bubb Road Special Center, the North De Anza Special Center, and the North Vallco Park Special Center (as referenced in the existing General Plan). These industrial areas are characterized by a mix 411 Appendix D Community Noise Fundamentals D-13REVISED PUBLIC DRAFT of light industrial, office, and research and development uses; with the exception of the Monta Vista Special Center and the North De Anza Special Center, these areas are usually separated from sensitive uses, such as residences, by either major roads or some degree of buffering. These uses have the potential to generate noise impacts upon nearby sensitive receptors located at the edges of these areas. Such impacts would vary depending on the specific uses, with truck deliveries, HVAC, and other mechanical equipment being the primary sources of noise. The separation of residences by streets or other buffering serves to decrease the noise perceived by these receptors and, in the case of major roads, the noise from the roads was generally observed to exceed that from the industrial uses. Residential neighborhoods in Cupertino with a notable potential to receive substantial industrial noise include portions of the Monta Vista Village Neighborhood (primarily in the vicinity of the area surrounding Bubb Road between Stevens Creek Boulevard and McClellan Road), as well as residential areas bordering the North De Anza Special Center. It should be noted, however, that although these areas allow for light industrial uses, offices and research and development comprise the majority of existing land uses in these areas. Hanson Permanente Quarry The Hanson Permanente Quarry and cement plant are located to the west of Cupertino, outside of the city boundary. The quarry and cement plant are owned and operated by Lehigh Hanson and are under the jurisdiction of the County of Santa Clara. The nearest sensitive receptors to the quarry and cement plant (within the city boundary) are residences located one-third mile to the east of the closest portion of quarry and plant operations; however, the bulk of quarry/plant equipment and structures are located approximately two-thirds mile from the nearest 412 COMMUNITY VISION 2040 City of Cupertino D-14 REVISED PUBLIC DRAFT residence. Given this distance and the presence of intervening hills that rise 100–200 feet above the elevation of the nearest residences, even the nearest residences would not be anticipated to experience excessive noise from quarry and plant operations. Construction Noise Construction activity also contributes to the noise environment of Cupertino; however, such activities are typically temporary, occurring in any one location for only a limited period of time. Larger or multi-phase construction projects may contribute to the noise environment of a particular location for a more extended period of time. Public infrastructure that requires ongoing maintenance may also result in ongoing noise impacts, though usually not at a constant location. For example, different sections of road may be repaved at different times, meaning that noise impacts from associated construction activities would, at any given time, only occur along and near the section of roadway undergoing such maintenance. Public Facility Noise Outdoor activities that occur on school campuses and in parks throughout the city generate noticeable levels of noise. Noise generated on both the weekdays (from physical education classes and sports programs) and weekends (from use of the fields and stadiums) can elevate community noise levels. 413 SECTION 3 Housing GEOLOGIC AND SEISMIC HAZARDS Appendix E E 414 E-2 Housing Commission Attachment B 415 Appendix E Geologic and Seismic Hazards E-3 The following definitions provide a more comprehensive discussion of the hazards that are described in the main body of the text of Chapter 7: Health and Safety Element. FAULT RUPTURE Surface fault rupture is the breaking of the ground along a fault trace usually during a large magnitude earthquake. Although the risk of damage associated with surface fault rupture is high, it can be avoided by not placing structures across active fault traces. Thus, an important element in community planning involves knowing the locations of active fault traces. The State of California has produced maps depicting the general locations of known active fault traces. These maps, referred to in the past as the Alquist- Priolo Special Studies Zones Maps and more recently as Earthquake Fault Maps, provide a location information about the most widely known active faults. Such as the San Andreas fault. However, the scale and resolution of these maps are not sufficient to accurately identify the location of faults with respect to individual properties and building sites. In addition, other significant local faults, such as the Monta Vista-Shannon and Sargent-Berrocal faults, are not covered by the State maps. The City has updated its Geology Map and Geologic Hazards Map to reflect the most recent data concerning local fault trace alignments. Within the City Fault Rupture “Zone F”, as illustrated on Figure HS-5: Geologic and Seismic Hazards, property own- ers must retain professional geologic consultants to deter- mine whether or not specific fault traces impact proposed building sites for habitable or critical structures. CONTENTS E-3 Fault Rupture E-4 Ground Shaking E-6 Seismic Ground Deformation E-7 Liquifi cation E-7 Seismically Induces Landslide E-8 Landslide Hazard REVISED PUBLIC DRAFT 416 COMMUNITY VISION 2040 City of Cupertino E-4 GROUND SHAKING Buildings and other structures located in seismically active regions such as the San Francisco Bay area are exposed to the hazard of severe ground shaking during earthquakes. Ground shaking is the vibration caused by rupture of a fault segment during an earthquake, and it can be felt over a wide area when the magnitude of the earthquake is very strong. The shaking intensity also is stronger in the area close to the earthquake epicenter and weaker in areas further away from the earthquake. In addition, the level of ground shaking is influenced by underlying rock for- mations, soil conditions and the depth to groundwater. A widely used shaking intensity scale is the Modified Mercalli Intensity Scale (Table E-1), which describes the amount of damage occurring at any geographical location in response to seismic shaking. The intensity of an earthquake ground shaking is related to the size or magnitude of the earthquake. Each magni- tude represents 10 times the amount of ground motion and approximately 31 times the amount of energy as the next lower numeral. Thus, an earthquake of magnitude 8 releases about 1,000 times more energy (31 x 31) than a magnitude 6 earthquake. A large-magnitude earthquake on nearby faults could cause considerable local damage, depending on the distance from the epicenter and char- acteristics of the ground. In general, structures on less well-consolidated bedrock and soil will experience greater shaking intensities than structures situated on hard rock. REVISED PUBLIC DRAFT 417 Appendix E Geologic and Seismic Hazards E-5 TABLE E-1: GENERAL COMPARISON BETWEEN EARTHQUAKE MAGNITUDE AND THE EARTHQUAKE EFFECTS DUE TO GROUND SHAKING Earthquake Category Richter Mag. Modifi ed Mercalli Intensity Scale (After Huser, 1970)Damage to Structure Minor2.00 I Detected only by sensitive instru- ments No Damage II Felt by few persons at rest, esp. on upper floors; delicate suspended 3.00 III Felt noticeably indoors, but not always recognized as an earthquake; standing cars rock slightly, vibration like passing trucks IV Felt indoors by many, outdoors by a few; at night some awaken; dishes, windows, doors disturbed; 4.00 V Felt by most people; some breakage of dishes, windows and plaster; dis- turbance to tall objects Architectural Damage VI Felt by all; many are frightened and run outdoors; Falling plaster and chimneys; damage small 5.00 5.3 VII Everybody runs outdoors. Damage to buildings varies depending on quality of construction; noticed by driver of cars Moderate 6.00 VIII Chimneys fall; sand and mud ejected; drivers of cars disturbed Structural Damage 6.9 X Building shifted off foundations, cracked, thrown out plumb; ground cracked, underground pipes broken; serious damage to reservoirs/embankments Major7.00 X Most masonry and frame structures destroyed; ground cracked; rails bent slightly; landslides 7.7 XI Few structures remain standing; bridges destroyed; fissures in ground; pipes broken; land slides; rails bent * Subjective measure of ground shaking; not engineering measure of ground acceleration REVISED PUBLIC DRAFT 418 COMMUNITY VISION 2040 City of Cupertino E-6 The 1997 Uniform Building Code (UBC) incorporates new seismic design parameters that take into account various types of faults, soil profile types and near-source accel- eration factors. The majority of the City located west of Highway 85 is located within 2 kilometers of known seismic sources (per California Division of Mines and Geology Near-Source Zones Map E-19). Proposed new development located within two kilometers of a known seismic source receives the most stringent near-source design factor, which is required for use with 1997 UBC structural design calculations. Figure E-1 generally depicts the location of the various faults and hazard zones within the Cupertino planning area. SEISMIC GROUND DEFORMATION Ground located in relatively close proximity to active fault traces may experience some level of ground deformation beyond the primary surface fault rupture zones. The distri- bution of this anticipated deformation is illustrated by the updated City Geologic Hazard Map – “Zone D”. Ground deformation away from the primary rupture zones may include broad bowing or warping of the surface, ground cracking and secondary ground fissuring. The general mag- nitudes of such deformation could be up to several inches, whereas ground impacted by primary surface fault rupture could experience offsets of several feet. Adjacent to local thrust faults (Berrocal and Monta Vista faults), relatively broad zones of ground deformation should be anticipated immediately west of the mapped fault trace alignments. These zones of deformation are anticipated to result from seismic displacement at depth along inclined fault planes descending to the west. The potential for such ground deformation should be considered during design of new structures near active fault traces. REVISED PUBLIC DRAFT 419 Appendix E Geologic and Seismic Hazards E-7 LIQUEFACTION Soil liquefaction is the phenomenon in which certain water-saturated soils lose their strength and flow as a fluid when subjected to intense shaking. With loss of soil strength, lateral spreading or sliding of soil toward a stream embankment can occur. Liquefaction can also result in the formation of sand boils, which represent conduits of pressure release from within the liquefied layer (at depth) to the ground surface. Liquefaction can also lead to local settlement of the ground surface and a reduction of bear- ing support for building foundations. The potential exists for tilting or collapse of structures due to liquefaction of underlying earth materials. Currently identified lands subject to a moderate or higher level of risk for liquefaction are essentially coincident with areas of potential flood inundation adjacent to local creek channels. Relatively deep, unconsolidated granular soil materials potentially prone to liquefaction may occur in these areas. The combined liquefaction and flood inun- dation hazard is depicted by Hazard “Zone I” on the City Geotechnical Hazards Map. SEISMICALLY INDUCED LANDSLIDING Reactivation of existing landslides or generation of new slope failures (as discussed in the following section on landslides) may be initiated under intense seismic ground shaking conditions. As a result of the 1989 Loma Prieta earthquake, many large pre-existing landslides demon- strated lurching or other signs of movement and partial reactivation within the local Santa Cruz Mountains to the southwest of the City. Intense seismic ground shaking from a nearby earthquake could trigger new slope failures or REVISED PUBLIC DRAFT 420 COMMUNITY VISION 2040 City of Cupertino E-8 movement of pre-existing landslides. Steep to precipitous banks adjacent to the flood plane of Stevens Creek may be particularly susceptible to seismically induced land sliding. These areas, and other mapped landslides within the City, are included within “Zone L” on the City Geotechnical Hazard Map. LANDSLIDE HAZARDS Landslides present the greatest geologic hazards to the foothills and low mountains in the planning area. The slid- ing of a slope is the normal geologic process that widens valleys and flattens slopes. The rate ranges from rapid rock fails to very slow soil and bedrock creep. Landslides are caused by inter-related natural factors, such as weak soil and rock over hillsides made steeper by rapid stream erosion, adverse geologic structure, groundwater levels and high rainfall rates. Landslides can be caused by improper grading, excessive irrigation, removal of natural vegetation and altering surface and subsurface drainage. Figure E-1 on page 5 shows mapped landslide deposits within Cupertino. Geologic mapping in the hillsides shows that landslide deposits cover as much as 20 to 30 percent of the hillsides in the planning area. Landslides range from small, shallow deposits made up of soil and weak bedrock materials to large, deep landslides involving a large amount of bedrock. Extensive geologic characterization and engineering anal- yses are necessary to determine the long-term stability of a landslide deposit. Old deposits are the most difficult to judge. Experience shows that old landslide deposits are far more likely to move again than areas that have not had landslides before. REVISED PUBLIC DRAFT 421 Appendix E Geologic and Seismic Hazards E-9 Areas in these old landslides that are next to steep, new stream channels are more likely to have new landslides than areas further from the new channels. This would be espe- cially true with severe shaking during a major earthquake on any of the three faults in Cupertino. The historic account of the 1906 earthquake shows many landslides occurred throughout the Santa Cruz Mountains. Some of these were catastrophic, causing loss of life, personal injury and severe damage to buildings. Landslides are expected along the high, steep embank- ments that bound the Stevens Creek flood plane, confined to local sites along the stream channel alignment extending from the front the hillsides across the valley floor. This hazard can be reduced significantly by restrictive building at the base and top of the embankments. REVISED PUBLIC DRAFT 422 COMMUNITY VISION 2040 City of Cupertino E-10 Figure E-1 Cupertino Geology Santa Cr u z C o unty Santa C l a ra Cou n t y FO O T H I L L B L V D ST E L L I N G R D De A N Z A B L V D HOMESTEAD ROAD WO L F E R D STEVENS CREEK BLVD BL A N E Y A V E MI L L E R A V E BOLLINGERRD McCLELLAN ROAD RAINBOW DRIVE BU B B R O A D PROSPECT ROAD 85 280 TA NTAU AV E Stevens Creek Reservoir Qal–Valley Floor Alluvium QTsc– Santa Clara Formation Tus,Tm,vq–Tertiary Sedimentary Rocks KJr– Franciscan Assemblage Landslides (Schematic) Fault Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Legend Sunnyvale Santa Clara San Jose Saratoga 01000 0500 3000 00.51Mile 1000 Feet Meters Los Altos Fa u l t Sa n A n d r e a s F a u l t B e r r o c a l Fault Mo n t a V i s t a Qal Qal Qal Qal QTsc QTsc QTsc QTsc KJr KJr KJr Tvq Tvq Tus, Tm REVISED PUBLIC DRAFT 423 SECTION 3 Housing SLOPE DENSITY Appendix E E 424 C-2 Housing Commission Attachment B 425 Appendix F Slope Density F-3REVISED PUBLIC DRAFT STATEMENT OF PURPOSE This appendix has been prepared with the intent of acquainting the general reader with the slope‑density approach the City uses for determining the intensity of residential development. The slope‑density approach was incorporated in the hillside plan in order to develop an equitable means of assigning dwelling unit credit to property owners. In addition to offering the advantage of equal treatment for property owners, the slope‑density formula can also be designed to reflect property owners, the slope‑density formula can also be designed to reflect judgments regarding aesthetics and other factors into a mathematical model which determines the number of units per acre on a given piece of property based upon the average steepness of the land. Generally speaking, the steeper the average slope of the property, the fewer the number of units which will be permitted. Although the slope‑density formula can be used as an effective means to control development intensity, the formula itself cannot determine the ideal development pattern. The formula determines only the total number of dwelling units, allowable on the property, based upon the average slope; it does not determine the optimum location of those units on the property. Exogenous factors not regulated by the slope‑density formula such as grading, tree removal, or other environmental factors would be regulated by other means. The slope‑density formulas do not represent by themselves a complete safeguard against development detrimental to the environment; but, together with other conservation measures, they are considered a valuable planning device. CONTENTS F-3 Statement of Purpose F-4 Discussion of “Slope” F-5 Description of Slope Density F-8 How to Conduct a Slope Density Analysis 426 COMMUNITY VISION 2040 City of Cupertino F-4 REVISED PUBLIC DRAFT DISCUSSION OF “SLOPE” Steepness of terrain can be defined in several ways: (1) as the relationship between the sides of the triangle representing a vertical section of a hill, or (2) as the angle between the terrain and the horizontal plain. Unfortunately, the definitions of the terms “slope,” “grade,” “gradient,” “batter,” and of the expression “the slope is 1 to...” are not well known or uniformly applied, causing confusion. For purposes of this discussion, the concept of steepness of terrain will be defined and discussed as a “percentage of slope.” “Percent of slope” is defined as a measurement of steepness of slope which is the ratio between vertical and horizontal distances expressed in percent. As illustrated in Figures F-1, 50 percent slope is one which rises vertically 5 feet in a 10 foot horizontal distance. 10'-00" 5'-00" 50% Average Slope Figure F‑1 Example of 50% Average Slope 427 Appendix F Slope Density F-5REVISED PUBLIC DRAFT One of the most common confusions of terminology relative to terrain steepness is the synonymous usage of “percent of grade” and “degree of grade.” However, as Figure F-2 indicates, as percent of grade increases, land becomes steeper at a decreasing rate. The present slope‑density formulas specified by the City of Cupertino require more land for development as the rate of percent of grade increases. As a result, the relationship between percent of grade and degree of grade is inverse rather than corresponding. To more accurately assess the impact of steepness of terrain on the feasibility of residential development, it might be helpful to examine some of phenomena commonly associated with increasing percentages of slope steepness. DESCRIPTION OF SLOPE-DENSITY The “Foothill Modified” Slope Density The “Foothill Modified” slope density is designed for application to those properties in the “Fringe” of the Hillside study area with average slopes less than 10 percent. The formula assumes availability of municipal services. Beginning at credit of 3.5 dwelling units/acre, the formula follows a cosine curve of decreasing density credit with increase of slope, achieving a constant above 43 percent average slope. 428 COMMUNITY VISION 2040 City of Cupertino F-6 REVISED PUBLIC DRAFT 0 Pe r c e n t o f G r a d e De g r e e o f G r a d e Degree of Change for 10% Grade Increase 6 15 17 22 27 31 35 39 42 45 48 50.5 52.5 54.5 56.5 0 6 51/2 51/2 5 5 4 4 4 3 3 3 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 21/2 222 Figure F‑2 Degree of Grade 429 Appendix F Slope Density F-7REVISED PUBLIC DRAFT The “Foothill Modified 1/2 Acre” slope density This slope density is applied in the Urban Service Area to those properties where a full range of municipal utility services; are available. The formula begins at density of 1/2 acre per dwelling unit which holds constant at 22 percent average slope. From 22 percent to 43 percent average slope, the formula follows a cosine curve of decreasing density credit with increasing slope. The density credit above 43 percent average slope remains constant at 0.20 dwelling units/acre. The “5-20” slope density This slope density is applied to properties that lie west of the urban/suburban fringe. TABLE F-1 SLOPE CHARACTERISTICS Percent of Slope Description of Slope Problems 0‑5%Relatively level land. Little or no development problems due to steepness of slope. 5‑15% Minimum slope problems increasing to significant slope problems at 15%. 15% is the maximum grade often considered desirable on subdivision streets. Above 15%, roads must run diagonally to, rather than at right angles to contours increasing the amount of cut and fill. For example, the lower segment of San Juan Road in the Cupertino foothills averages 20% in grade. 15‑30% Slope becomes a very significant factor in development at this steepness. Development of level building sites requires extensive cut and fill in this slope category and the design of individual houses to fit terrain becomes important. 30‑50% Slope is extremely critical in this range. Allowable steepness of cut and rill slopes approach or coincide with natural slopes resulting in very large cuts and fills under con‑ ventional development. In some cases, fill will not hold on these slopes unless special retaining devices are used. Because of the grading problems associated with this cate‑ gory, individual homes should be placed on natural building sites where they occur, or buildings should be designed to fit the particular site. 50%+Almost any development can result in extreme disturbances in this slope category. Except in the most stable native material special retaining devices may be needed. 430 COMMUNITY VISION 2040 City of Cupertino F-8 REVISED PUBLIC DRAFT HOW TO CONDUCT A SLOPE-DENSITY ANALYSIS (MAP WHEEL METHOD) The computation of density using a slope‑density formula is relatively simple once the basic concepts are understood. The section of Appendix A (Land Use Designations) describes the basic concepts in order to enable individuals to determine density. The City Planning staff will provide technical assistance; however, it is the responsibility of the owner or potential developer to provide accurate map materials used in the slope‑density investigation for a specific property. The City has map material which is accurate enough to provide an approximate slope‑density evaluation. Accurate information needed to evaluate a specific development proposal must be provided by the owner or developer. Step 1: Selection of Map Material To begin any slope‑density investigation, it is important to select the proper mapping material. Maps on which measurements are made must be no small in scale than 1”=200’ (1:2400). All maps must be of the topographical type with contour intervals not less than 10 feet. If the map wheel method is used for measuring contours, or if a polar planimeter is used for measurement of an area, maps on which such measurements are made must not be smaller in scale than 1”=50’ (1:600); these maps may be enlarged from maps in a scale not less than 1”=200’. Enlargement of maps in smaller scale than 1”=200’, or interpolation of contours is not permitted. 431 Appendix F Slope Density F-9REVISED PUBLIC DRAFT Property Line Composite Grid "Cell" Standard Grid "Cell" 1 5 0 5 0 4 0 6 0 6 0 6 0 6 0 7 0 7 0 8 0 8 0 3 5 2 4 6 7 County Grid Line "A" County Grid Line "B" Intersection At "Q" Figure F‑2 Site Analysis Step 2: Layout of Standard Grid The property for which area and slope are to be measured is divided into a network of “cells” constructed from a grid system spaced at 200 ft. intervals. In order to ensure a common reference point and to prevent the practice of “gerrymandering’ the grid system to distort the average slope of the property, the grid system must be oriented parallel to the grid system utilized by Santa Clara County’s 1”=500’ scale map series. Figure F-2 illustrates a hypothetical property divided into cells by a 200 ft. grid network. It is perhaps easiest 432 COMMUNITY VISION 2040 City of Cupertino F-10 REVISED PUBLIC DRAFT to construct the 200’ x 200’ cells by beginning at an intersection point of perpendicular County grid lines (“Q” in Figure F‑2) and then measuring 200 ft. intervals along the two County grid lines until the entire property is covered with a network. After the grid lines have been laid out, it is helpful to number each 200 ft. square cell or part thereof. Whenever the grid lines divide the property into parts less than approximately 20,000 sq. ft., such areas shall be combined with each other or with other areas so that a number of parts are formed with the areas approximately between 20,000 and 60,000 sq. ft. Cells formed by combining several subareas should be given a single number and should be shown on the map with ‘hooks’ to indicate grouping (see Area 2 on Figure F-2). At this point, the investigator should obtain a copy of the “Slope‑Density Grid Method Worksheet,” Figure F-3 of this document. Under Column A (land unit), each line should be numbered down the page to correspond with the total number of cells on the property. Step 3: Measurement of Area and Contour Length With the map material property prepared in Steps One and Two, we can now begin the actual mechanics of the slope‑density analysis. The first task is to ascertain the acreage of the subject property. This acreage figure is obtained by measuring the area of each numbered cell divided by the 200 ft. grid, and then summing the results of the individual measurements. Since the standard grid cell measures 200’ x 200,’ it is only necessary to measure the area of any non‑standard size cell. Referring once again to the worksheet, as each cell is calculated for area, the results 433 Appendix F Slope Density F-11REVISED PUBLIC DRAFT should be entered in Column B ( and Column C optional). Irregularly shaped cells may be measured for area quickly and accurately by means of a polar planimeter. This device is an analog instrument which traces the perimeter of an area to be measured and gives the size in actual square inches. This measurement is then multiplied by the square of the scale of the map being used. For example, 1” ‑ 200’, the square of 200 ft. means 1” equals 40,000 sq. ft. The total square footage of each cell can then be converted to acreage by dividing by 43,560 sq. ft. More detailed instruction in the use of the planimeter may be obtained from the City Planning Department. Areas of irregular shape can also be measured by dividing each part into triangles, for which areas are determined by the formula A ‑ base x height + 2, if a planimeter is not available. Having now determined the area of each cell, one must now proceed to measure the contour lengths of the property. Contour length and interval are both vital factors in calculating the average slope of the land. Each contour of a specified interval is measured separately within each standard cell or other numbered zone for which the area has been calculated. The map wheel is set at “zero” and is then run along the entire length of a contour within the boundary of the cell, lifted and placed on the next contour (without reseting the wheel to zero) and so forth until the total length of contours of the specified interval within the individual cell is determined. The map wheel will display a figure in linear inches traveled. This figure shown on the dial should then be multiplied by the map scale. (Example: map wheel reads – 14‑1/2 inches, map scale is 1” ‑ 50’. Contour length ‑ 14.5 x 50 ‑ 750’). The results should then be entered on the proper line of Column D (Figure F‑3). 434 COMMUNITY VISION 2040 City of Cupertino F-12 REVISED PUBLIC DRAFT Step 4: Calculation of Average Slope Knowing the total length of contours, the contour interval, and the area of each numbered cell, one may now calculate the average slope of the land. Either of the two formulas below may be used to calculate average slope: S= 0.0023 1 L A S = average slope of ground in percent I = contour interval in feet L = combined length in feet of all contours on parcel A = area of parcel in acres The value 0.0023 is 1 sq. ft. expressed as a percent of an acre: 1 sq. ft. = 0.0023 ac. 43,560 S=I x L x 100 A S = average slope of ground in percent I = contour intervaling feet L = combined length in feet of all contours on parcel A = area of parcel and square feet The results should be entered on the appropriate line of Column E of the worksheet. 435 Appendix F Slope Density F-13REVISED PUBLIC DRAFT Step 5: Determination of Dwelling Unit Credit With the average slope of the cell now determined, one can calculate the dwelling unit credit per cell by obtaining a factor from the appropriate slope‑density table (see Tables F-2 through F-4) then multiplying that factor by the area of the cell in acres. The formula factor is found by first reading the table column “s” (slope) until reaching the figure corresponding to the average slope of the cell being studied; next, one reads horizontally to the “d” column (density dwelling unit/acre). This factor should be entered in Column F of the worksheet. The factor in Column F is now multiplied by the acreage in Column B and the result entered under the appropriate slope‑density formula title (Column G, H, I or 1). Step 6: Summation of Results When all cells in the parcel have been analyzed in the manner previously described, the total for various components of the data may be derived and entered into the two bottom rows of the worksheet. Columns B, C (if used), and D should be summed at the bottom of the sheet. A mathematical average may be calculated for Column E. Columns G through J should be summed at the bottom of the page. The totals shown at the bottom of columns G through J represent the total number of dwelling units permitted on that property, based on the average slope. These totals should be carried out to a minimum of two decimal places. 436 COMMUNITY VISION 2040 City of Cupertino F-14 REVISED PUBLIC DRAFT PROPERTY DESCRIPTION:DWELLING UNIT CREDIT FROM SLOPE/DENSITY TA BLES LAND UNIT FOOTHILL MOD SEMI-RURAL COUNTYFOOTHILL MOD 1/2 ac. TOTALS BY GRID METHOD TOTA L BY SINGLE AREA AREA(acres)(sq. ft.)CONTOURAv. SLOPE FACTOR EXAMPLE 1 2 3 4 5 6 7 1.14 1.18 0.92 1.17 0.86 0.92 0.56 49600 51300 40000 51000 37600 40100 24300 750 680 320 490 470 190 210 15.3 13.3 8.0 9.6 12.6 4.8 8.6 0.545 0.572 0.625 0.606 0.572 0.660 0.616 0.621 0.675 0.575 0.709 0.492 0.607 0.345 4.0210.331102933666.75 Compos. Compos. Std. Compos. Compos. ABCDEF GH IJK Slope Density "Grid-Method" Wo rk Sheet Figure F‑3 Grid Method Worksheet 437 Appendix F Slope Density F-15REVISED PUBLIC DRAFT “Rounding” of Dwelling Unit Credit Results The City Council, during its meeting of March 7, 1977, adopted the following policy regarding the rounding up of a numerical dwelling unit yield resulting from application of a slope‑density formula: “The rounding up of the numerical yield resulting from application of a slope‑density formula may be permitted in cases where the incremental increase in density from the actual yield to the rounded yield will not result in a 10% increase of the actual yield. In no case, shall an actual yield be rounded up to the net whole number unless the fractional number is .5 or greater.” 438 COMMUNITY VISION 2040 City of Cupertino F-16 REVISED PUBLIC DRAFT TABLE F-2 SLOPE DENSITY FORMULA: “ FOOTHILL MODIFIED” Slope % Density D.U. per ac. Acres per D.U.Average lot area sq.ft Slope%Density D.U. per ac. acres per D.U. Average lot area sq.ft. s d 1/d43560/ds d1/d43560/d 53.5000.28612,446271.4060.71130,975 63.4940.28612,466281.2750.78434,169 73.4770.28812,528291.1470.87137,962 83.4480.29012,633301.0250.97642,498 93.4080.29312,781310.9081.10147,957 103.3570.29812,975320.7981.25354,569 113.2960.30313,216330.6961.43862,626 123.2240.31013,510340.6011.66472,484 133.1430.31813,859350.5151.94184,562 143.0530.32814,269360.4392.28099,305 152.9540.33914,746370.3722.688117,073 162.8480.35115,297380.3163.166137,905 172.7340.36615,932390.2703.698161,081 182.6140.38216,661400.2364.236184,532 192.4890.40217,498410.2134.695204,497 202.3600.42418,459420.2014.964216,235 212.2270.44919,562430.2014.964216,235 222.0910.47820,832 231.9540.51222,297 241.8150.55123,994 251.6780.59625,967 261.5410.64928,271 Notes: (a) d = 1.85 + 1.65 cos { (s‑5) x 4.8} (b) 5<s<44 439 Appendix F Slope Density F-17REVISED PUBLIC DRAFT 5 4.5 4 3.5 3 2.5 2 1.5 1 0.5 0 Foothill Modified Slope (%) 5101520 0.29 0.30 0.34 0.42 0.60 0.98 1.94 4.24 4.96 2530354043 Ac r e s ( p e r d w e l l i n g u n i t ) Figure F‑4 Foothill Modified 440 COMMUNITY VISION 2040 City of Cupertino F-18 REVISED PUBLIC DRAFT TABLE F-3 SLOPE DENSITY FORMULA: “ FOOTHILL MODIFIED 1/2 ACRE” Slope %Density D.U. per ac. Acres per D.U. Average lot area sq.ft s d 1/d 43560/d 22 2.091 0.478 20,832 23 1.954 0.512 22,297 24 1.815 0.551 23,994 25 1.678 0.596 25,967 26 1.541 0.649 28,271 27 1.406 0.711 30,975 28 1.275 0.784 34,169 29 1.147 0.871 37,962 30 1.025 0.976 42,498 31 0.908 1.101 47,957 32 0.798 1.253 54,569 33 0.696 1.438 62,626 34 0.601 1.664 72,484 35 0.515 1.941 84,562 36 0.439 2.280 99,305 37 0.372 2.688 117,073 38 0.316 3.166137,905 39 0.270 3.698161,081 40 0.236 4.236184,532 41 0.213 4.695204,497 42 0.201 4.964216,235 43 0.201 4.964216,235 Note: (a) d = 1.85 + 1.60’ cos {(s‑5) x 4.8} (b) 5<s<44 441 Appendix F Slope Density F-19REVISED PUBLIC DRAFT TABLE F-3 SLOPE DENSITY FORMULA: “ FOOTHILL MODIFIED 1/2 ACRE” Slope %Density D.U. per ac. Acres per D.U. Average lot area sq.ft sd1/d43560/d 222.0910.47820,832 231.9540.51222,297 241.8150.55123,994 251.6780.59625,967 261.5410.64928,271 271.4060.71130,975 281.2750.78434,169 291.1470.87137,962 301.0250.97642,498 310.9081.10147,957 320.7981.25354,569 330.6961.43862,626 340.6011.66472,484 350.5151.94184,562 360.4392.28099,305 370.3722.688117,073 380.3163.166137,905 390.2703.698161,081 400.2364.236184,532 410.2134.695204,497 420.2014.964216,235 430.2014.964216,235 5 4.5 4 3.5 3 2.5 2 1.5 1 0.5 0 Foothill Modified - 1/2 Acre Slope (%) 222530 0.48 0.60 0.98 1.94 4.24 4.96 354043 Ac r e s ( p e r d w e l l i n g u n i t ) Figure F‑5 Foothill Modified 1/2 Acre 442 COMMUNITY VISION 2040 City of Cupertino F-20 REVISED PUBLIC DRAFT TABLE F-4 5-20 ACRE SLOPE DENSITY Slope %Density D.U. per ac. Acres per D.U. Average lot area sq.ft Slope%Density D.U. per ac. acres per D.U. Average lot area sq.ft. s d 1/d43560/ds d 1/d43560/d 100.205.00217,800310.109.92431,964 110.205.07220,786320.1010.32449,722 120.195.15224,518330.0910.75468,121 130.195.26228,992340.0911.18487,154 140.195.38234,204350.0911.63506,814 150.185.51240,153360.0812.10527,093 160.185.67246,835370.0812.58547,982 170.175.84254,245380.0813.07569,475 180.176.02262,381390.0713.58591,563 190.166.23271,238400.0714.10614,238 200.166.45280,811410.0714.63637,491 210.156.63291,096420.0715.18661,313 220.146.94302,089430.0615.74685,696 230.147.20313,784440.0616.31710,630 240.137.49326,176450.0616.90736,106 250.137.79339,260460.0617.50762,115 260.128.10353,030470.0618.10788,648 270.128.44367,481480.0518.73815,694 280.118.78382,606490.0519.36843,244 290.119.15398,399500.0520.00871,288 300.119.52414,85450> 443 Appendix F Slope Density F-21REVISED PUBLIC DRAFT 20 18 16 14 12 10 8 6 4 5 – 20 Acre Slope Density Slope (%) 222530 5.005.00 5.51 6.45 7.79 9.52 14.10 11.63 16.90 20.00 354043 Ac r e s ( p e r d w e l l i n g u n i t ) 444 Regional Shopping / Office / Res EXHIBIT GPA-2 445 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 14-212 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO RECOMMENDING THAT CITY COUNCIL AUTHORIZE SUBMITTAL OF THE DRAFT HOUSING ELEMENT TO THE STATE DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENT (HCD) FOR REVIEW AND USE OF THE PRIORITIZED LIST OF POTENTIAL HOUSING ELEMENT SITES, IF NEEDED SECTION I: PROJECT DESCRIPTION Application No: GPA-2013-01 Applicant: City of Cupertino Location: Citywide SECTION II: RECITALS WHEREAS pursuant to City Council direction to initiate a project to replenish, reallocate and increase citywide development allocations in order to plan for anticipated future development activity while keeping with the community’s character, goals, and objectives and to consolidate development requests by several property owners for amendments to the General Plan, under a comprehensive community vision, and WHEREAS, pursuant to State Housing Law, the City Council has directed staff to update the Housing Element of the General Plan and make associated zoning amendments to comply with State Law; and WHEREAS, immediately prior to the Council’s consideration of this Housing Element draft, and following the Commission’s recommendation, the Council adopted Resolution No. 211, adopting a General Plan Amendment covering the properties which are the subject of this Housing Element draft; and WHEREAS, the draft Housing Element will be consistent with the City's General Plan land use map, proposed uses and surrounding uses; and WHEREAS, the consideration of the Draft Housing Element is part of the General Plan Amendment, Housing Element Update and Associate Rezoning, all as fully described and analyzed in the June 2014 General Plan Amendment, Housing Element Update, and Associated Rezoning Project Environmental Impact Report (“Draft EIR”) (State Clearinghouse No. 2014032007), as amended by text revisions in the August 2014 General Plan Amendment, Housing Element Update and Associated Rezoning Project EIR Response to Comments Document (“Response to Comments Document”) and Supplemental Text Revisions dated October 8, 2014 (together, the “Final EIR”); WHEREAS, the Final EIR was presented to the Planning Commission on September 9, 2014 at a Planning Commission Study Session; and 446 WHEREAS, the Final EIR was presented to the City Council on October 7, 2014 at a City Council Study Session; and WHEREAS, the necessary public notices have been given as required by the procedural ordinances of the City of Cupertino and the Government Code, and the Planning Commission held public hearings on October 14, 2014 and October 20, 2014 to consider the project; and WHEREAS, based on substantial evidence in the administrative record, on October 20, 2014 the Planning Commission recommended that the City Council certify that the Final EIR has been completed in compliance with the California Environmental Quality Act, Public Resources Code Section 21000 et seq., and reflects the independent judgment and analysis of the City, adopt the Findings and Statement of Overriding Considerations, and implement all of the mitigation measures for the Project that are within the responsibility and jurisdiction of the City that are identified in Findings (Resolution no. 6760); and WHEREAS, on October 20, 2014, the Planning Commission recommended on a 4-0-1 (Takahashi absent) vote that the City Council adopt the General Plan Amendment (GPA-2013-01) (Resolution no. 6761); authorize staff to forward the Draft Housing Element to the State Department of Housing and Community Development for review (GPA-2013-02); approve the prioritized list of potential Housing Element sites in the event amendments are needed to the proposed Housing Element sites upon HCD review (Resolution no. 6762); approve the Zoning Map Amendments, Z-2014-0X, in substantially similar form to the Resolution presented (Resolution no. 6763); approve the Municipal Code Amendments to make changes to conform to the General Plan and Housing Element and other clean up text edits (MCA-2014-01) (Resolution no. 6764); approve the Specific Plan Amendments, SPA-2014-01, in substantially similar form to the Resolution presented (Resolution no. 6765); and WHEREAS, on November 10, 2014, upon due notice, the City Council has held at least one public hearing to consider the draft Housing Element and prioritization of the potential sites; and WHEREAS, the City Council of the City of Cupertino is the decision-making body for this Resolution; WHEREAS, after consideration of evidence contained in the entire administrative record, at the public hearing on November 10, 2014, the City Council adopted Resolution No. 14-210 certifying the EIR, adopting Findings and a Statement of Overriding Considerations, adopting Mitigation Measures, and adopting of a Mitigation Monitoring and Reporting Program. WHEREAS, prior to taking action on this Resolution, the City Council has exercised its independent judgment in carefully considering the information in the EIR finds that scope of this draft Housing Element falls within the previously certified EIR; and NOW, THEREFORE, BE IT RESOLVED: After careful consideration of the, maps, facts, exhibits, testimony and other evidence submitted in this matter, the City Council authorizes: 447 1. Submittal of the draft housing element and technical appendix to the State Department of Housing and Community Development for review (Application No. GPA-2013-01) as shown in Exhibit HE-1; and 2. Use of the prioritized list of potential housing element sites in the event amendments are needed to the proposed housing element sites upon HCD review, as shown in Exhibit HE-2. PASSED AND ADOPTED this 10th day of November 2014, at a Meeting of the City Council of the City of Cupertino by the following roll call vote: AYES: NOES: ABSTAIN: ABSENT: ATTEST: APPROVED: Grace Schmidt Gilbert Wong, City Clerk Mayor, City of Cupertino 448 SECTION 3 Housing HOUSING ELEMENT Chapter 4 4 449 REVISED PUBLIC DRAFT HE-2 Housing Commission Attachment B 450 HE-3 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT INTRODUCTION Cupertino is a community with a high quality of life, a renowned school system, and a robust high-technology economy. The long term vitality of Cupertino and the local economy depend upon the availability of all types of housing to meet the community’s diverse housing needs. As Cupertino looks towards the future, increasing the range and diversity of housing options will be integral to the City’s success. Consistent with the goal of being a balanced community, this Housing Element continues the City’s commitment to ensuring new opportunities for residential development, as well as for preserving and enhancing our existing neighborhoods. Role and Content of Housing Element The Housing Element is a comprehensive eight-year plan to address housing needs in Cupertino. This updated Housing Element focuses on housing needs from January 31, 2015 through January 31, 2023, in accordance with the housing element planning period established by State law for San Francisco Bay Area jurisdictions. This Housing Element is the City’s primary policy document regarding the development, rehabilitation, and preservation of housing for all economic segments of the population. Per State Housing Element law, the document must be periodically updated to: ƒƒOutline the community’s housing production objectives consistent with State and regional growth projections ƒƒDescribe goals, policies and implementation strategies to achieve local housing objectives ƒƒExamine the local need for housing with a focus on special needs populations CONTENTS HE-3 Introduction Role and Content of Housing Element HE-4 Housing Needs Assessment Demographic Trends in Cupertino Housing Stock Characteristics Market Conditions and Income Related to Housing Costs HE-15 Regional Housing Needs and Allocation HE-16 Housing Resources HE-19 Housing Plan Qualified Objectives 451 HE-4 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT ƒƒIdentify adequate sites for the production of housing serving various income levels ƒƒAnalyze potential constraints to new housing production ƒƒEvaluate the Housing Element for consistency with other General Plan elements This element outlines the community’s projected housing needs and defines the actions the City will take to address them. General Plan Appendix B provides detailed background information to meet all requirements of State Housing Element law. HOUSING NEEDS ASSESSMENT This section describes the demographic, housing, and economic conditions in Cupertino; assesses the demand for housing for households at all income levels; and documents the demand for housing to serve special needs populations. The Housing Needs Assessment establishes the framework for defining the City’s housing goals and formulating policies and ptrategies that address local housing needs. A community’s population characteristics can affect the amount and type of housing needed. Factors such as population growth, household type, and whether or not households are more likely to rent or buy their homes influence the type of housing needed. Reducing waste and efficiently managing resources will help further natural conserva- tion goals The Housing Needs Assessment establishes the framework for defining the City’s housing goals and needs 452 HE-5 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT Demographic Trends in Cupertino and the Region Population The City’s population increased by 15 percent between 2000 and 2010, exceeding the growth rate of Santa Clara County (six percent), the San Francisco Bay area (five percent), and the State of California (10 percent) (see Table HE-1). During this period, Cupertino grew from 50,546 to 58,302 residents. A portion of this population growth can be attributed to the annexation of 168 acres of land between 2000 and 2008. Annexation of Garden Gate, Monta Vista, and scattered County “islands” added 1,600 new residents. After removing the population increases from these annexations, Cupertino experienced a 12-percent increase in its population during the previous decade. Households A household is defined as a person or group of persons living in a housing unit, as opposed to persons living in group quarters, such as dormitories, convalescent homes, or prisons. In 2010, Cupertino was home to 20,181 households (see Table HE-1). The City added approximately 2,000 new households between 2000 and 2010, an increase of 11 percent. Approximately 600 of these households, however, resulted from annexations. After adjusting for household increases due to annexation, the number of households grew by only eight percent between 2000 and 2010. During the same time period, the number of households increased by 6.8 percent in Santa Clara County. Household Type Households are divided into two different types, depending on their composition. Family households are those consisting of two or more related persons living together. The City’s population increase has placed new pressures on Cupertino’s neighborhoods 453 HE-6 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT Non-family households include persons who live alone or in groups of unrelated individuals. Cupertino has a large proportion of family households. In 2011, family households comprised 77 percent of all households in the City, compared with 71 percent of Santa Clara County households (see Table HE-1). Household Tenure Households in Cupertino are more likely to own than rent their homes. Approximately 63 percent of Cupertino households owned their homes in 2010. By comparison, 58 percent of Santa Clara County households owned homes (see Table HE-1). Long-term Projections Table HE-2 on page HE-7 shows population, household, and job growth projections for Cupertino, Santa Clara County, and the nine-county Bay Area region between 2010 and 2040 and represents the analysis conducted by the Association of Bay Area Governments (ABAG) using 2010 Census data and a variety of local sources. Between 2010 and 2040, Cupertino’s population is expected to grow by 12,898 residents—from 58,302 to 71,200. This translates into an increase of 22 percent over 30 years. ABAG projects both Santa Clara County and the ABAG region will experience much larger growth over the same time period (36 percent and 31 percent, respectively). Cupertino’s job growth is expected to continue to outpace population and household growth between 2010 and 2020, compounding the “jobs rich” nature of the City and the region. By 2020, Cupertino is anticipated to have a jobs-to- housing ratio of 1.40 (up from 1.29 in 2010, but mirroring the regional average of 1.40). Job growth in Cupertino is projected to level off after 2020 to a comparable pace with population and household growth. Similar trends are also projected for the County and the ABAG region as a whole. Family households are the largest proportions of household type in Cupertino 454 HE-7 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT TABLE HE-1: POPULATION AND HOUSEHOLD TRENDS, 2000-2010/2011 2000 2010/2011 Total Change 2000-2010 Percent Change 2000-2011 City of Cupertino Population 50,546 58,302 7,756 15.3% Households 18,204 20,181 1,977 10.9% Average Household Size (a)2.75 2.83 Household Type (a) Families 74.8%77.4% Non-Families 25.2%22.6% Tenure Owner 63.6%62.6% Renter 36.4%37.4% Santa Clara County Population 1,682,585 1,781,642 99,057 5.9% Households 565,863 604,204 38,341 6.8% Average Household Size (a)2.92 2.89 Household Type (a) Families 69.9%70.8% Non-Families 30.1%29.2% Tenure Owner 59.8%57.6% Renter 40.2%42.4% Bay Area (b) Population 6,783,760 7,150,739 366,979 5.4% Households 2,466,019 2,608,023 142,004 5.8% Average Household Size (a)2.69 2.69 Household Type (a) Families 64.7%64.8% Non-Families 35.3%35.2% Tenure Owner 57.7%56.2% Renter 42.3%43.8% California Population 33,871,648 37,253,956 3,382,308 10.0% Households 11,502,870 12,577,498 1,074,628 9.3% Average Household Size (a)2.87 2.91 Household Type (a) Families 68.9%68.6% Non-Families 31.1%31.4% Tenure Owner 56.9%55.9% Renter 43.1%44.1% Notes: (a) Average household size and household type figures from American Community Survey (ACS), 2007-2011. (b) Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, and Sonoma Counties. Source: Association of Bay Area Governments (ABAG), Housing Element Data Profiles, December 2013. 455 HE-8 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT Housing Stock Characteristics A community’s housing stock is defined as the collection of all types of housing located within the jurisdiction. The characteristics of the housing stock—including condition, type, and affordability—are important in determining the housing needs for Cupertino. Distribution of Units by Structure Type A majority of housing units in Cupertino are single- family detached homes (57 percent in 2013). While still representing the majority house type, this represents a decrease from 2000, when 61 percent of all homes were single-family detached. In comparison, single-family detached homes in both Santa Clara County and the Bay Area comprised 54 percent of all homes in 2013. Large multi-family buildings (defined as units in structures containing five or more dwellings) represent the second TABLE HE-2: POPULATION, HOUSEHOLD, AND JOB PROJECTIONS, 2010-2040 Percent Change 20102020203020402010-20202020-20302030-2040 City of Cupertino Population 58,30262,10066,30071,2006.5%6.8%7.4% Households 20,18121,46022,75024,0406.3%6.0%5.7% Jobs 26,09029,96031,22033,11014.8%4.2%6.1% Santa Clara County Population 1,781,6421,977,9002,188,5002,423,50011.0%10.6%10.7% 604,204675,670747,070818,40011.8%10.6%9.5% Jobs 926,2701,091,2701,147,0201,229,52017.8%5.1%7.2% Bay Area (a) Population 6,432,2887,011,7007,660,7008,394,7009.0%9.3%9.6% Households 2,350,1862,560,4802,776,6402,992,9908.9%8.4%7.8% Jobs 3,040,1103,579,6003,775,0804,060,16017.7%5.5%7.6% Notes: a) Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, and Sonoma Counties. Source: Association of Bay Area Governments (ABAG), Housing Element Data Profiles, December 2013. The population of Cupertino is expected to increase by twenty-two percent over the next thirty years 456 HE-9 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT largest housing category in Cupertino (21 percent), followed by single-family attached dwellings (12 percent). Between 2000 and 2013, these two housing types experienced an increase of 24 and 26 percent, respectively. Market Conditions and Income Related to Housing Costs The cost of housing is dependent on a variety of factors, including underlying land costs, market characteristics, and financing options. In the Bay Area, the technology boom has increased the demand for new housing at all income levels, resulting in both lower-earning residents and well-paid area professionals competing for housing in an overcrowded and expensive market. High housing costs can price lower-income families out of the market, cause extreme cost burdens, or force households into overcrowded conditions. Cupertino has some of the highest housing costs in the region. Rental Market Characteristics and Trends A review of rental market conditions in Cupertino was conducted for this Housing Element by reviewing advertised apartment listings. The survey found that market-rate rents averaged: ƒƒ$1,608 per month for studio units ƒƒ$2,237 per month for one-bedroom units ƒƒ$2,886 per month for two-bedroom units ƒƒ$3,652 per month for three-bedroom units Rental prices in Cupertino ranged from $1,400 for a studio unit to $5,895 for a five-bedroom unit. As can be expected, smaller units are generally more affordable than larger units. The overall median rental price for all unit sizes surveyed was $2,830, and the average price was $2,919. The Bay Area technology boom has increased housing demand at all levels 457 HE-10 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT Home Sale Trends While other areas of the State and nation experienced downturns in the housing market during the national recession that began in 2008, Cupertino home values have continued to grow. During the depth of the housing market crash (between 2008 and 2010), the median home price in Cupertino held steady at around $1,000,000. Since 2011, home prices in Cupertino have increased substantially. The 2013 median home sales price of $1,200,000 in Cupertino was nearly double that of the County median price ($645,000), and prices continued to rise in 2014. Housing Affordability According to the federal government, housing is considered “affordable” if it costs no more than 30 percent of a household’s gross income. Often, affordable housing is discussed in the context of affordability to households with different income levels. Households are categorized as very low income, low income, moderate income, or above moderate income based on percentages of the area median income established annually by the California Department of Housing and Community Development (HCD). In 2014, the area median income for Santa Clara County was $105,500 for a family of four. Special Housing Needs Certain groups have more difficulty finding decent, affordable housing due to their special circumstances. Special circumstances may be related to one’s income- earning potential, family characteristics, the presence of physical or mental disabilities, or age-related health issues. As a result, certain groups typically earn lower incomes and have higher rates of overpayment for housing, or they may live in overcrowded residences. Housing Element law specifically requires an analysis of the special housing needs Despite the national economic downturn, Cupertino home values have continued to rise 458 HE-11 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT of the elderly, the disabled, female-headed households, large families, farmworkers, and homeless persons and families. Table HE-3 summarizes demographics for these special needs groups in Cupertino. TABLE HE-3: SPECIAL NEEDS GROUPS IN CUPERTINO Special Needs Group Person or Household RenterOwnerPercent of Total Senior-Headed Households 3,983 785 (19.7%)3,198 (80.3%)19.7% Households with a Senior Member 5,069 n/a n/a 25.1% Seniors Living Alone 1,612 516 (32.0%)1,096 (68.0%)8.0% Large Households 1,883 619 (32.9%)1,264 (67.1%)9.3% Single-Parent Households 883 n/a n/a 4.4% Female Single-Parent Households 667 n/a n/a 6.9% Persons with Disabilities (a)3,445 n/a n/a 5.9% Agricultural Workers (b)36 n/a n/a <1% Persons living in Poverty (b)2,330 n/a n/a 4.0% Homeless (c)112 n/a n/a <1% Notes: (a) 2010 Census data not available for persons with disabilities. Estimate is from the 2008-2012 ACS. Estimate is for persons 5 years of age and older. (b) 2010 Census data not available. Estimate is from the 2007-2011 ACS. (c) 2010 Census data not available. Estimate is from 2013 Santa Clara County Homeless Point-In-Time Census and Survey Comprehensive Report. Of the 112 homeless persons counted in Cupertino in 2013, 92 persons were unsheltered and 20 were sheltered. Sources: Association of Bay Area Governments (ABAG), Housing Element Data Profiles, December 2013; U.S. Census, American Community Survey (ACS), 2008-2012; 2013 Santa Clara County Homeless Point-In-Time Census and Survey Comprehensive Report 459 HE-12 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT Seniors Many senior residents face a unique set of housing needs, largely due to physical limitations, fixed incomes, and health care costs. Affordable housing cost, unit sizes and accessibility to transit, family, health care, and other services are critical housing concerns for seniors. In 2010, 20 percent of Cupertino householders were 65 years old or older, slightly higher than the proportion of senior households in Santa Clara County (18.5 percent). A large majority of these senior households owned their homes; 86 percent of elderly households were homeowners, compared to only 58 percent of householders under 64 years old. Cupertino’s elderly renter households are more likely to be lower income than elderly owner households. Approximately 62 percent of elderly renter households earned less than 80 percent of the area median income compared to 42 percent of senior homeowners. Elderly households also tend to pay a larger portion of their income on housing costs than do other households. Large Households Large households are defined as those with five or more members. Large households are identified as a special needs group because of limited opportunities for adequately sized and affordable housing. Cupertino has a smaller proportion of large households than Santa Clara County as a whole (9.3 percent in Cupertino compared to 15 percent in Santa Clara County). In the City, large households are more likely to be homeowners (67 percent) than renters (33 percent). Approximately 64 percent of the housing units in Cupertino have three or more bedrooms and can accommodate large households. Cupertino’s elderly renter households are more likely to be lower income than elderly owner households 460 HE-13 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT Single-Parent Households Single-parent households often require special consideration and assistance because of their greater need for affordable housing and accessible day care, health care, and other supportive services. Female-headed single-parent households with children, in particular, tend to have a higher need for affordable housing than other family households in general. In addition, these households are more likely to need childcare since the mother is often the sole source of income in addition to being the sole caregiver for the children in the household. In 2010, 667 female-headed single-parent households with children under 18 years of age lived in Cupertino, representing 3.3 percent of all households in the City. A significant proportion of these households were living in poverty (21 percent). Persons with Disabilities A disability is a physical or mental impairment that limits one or more major life activities. Persons with disabilities generally have lower incomes and often face barriers to finding employment or adequate housing due to physical or structural obstacles. This segment of the population often needs affordable housing that is located near public transportation, services, and shopping. Persons with disabilities may require units equipped with wheelchair accessibility or other special features that accommodate physical or sensory limitations. Depending on the severity of the disability, people may live independently with some assistance in their own homes, or may require assisted living and supportive services in special care facilities. Approximately six percent of Cupertino residents and eight percent of Santa Clara County residents had one or more disabilities in 2010. In 2010, a significant proportion of Cupertino’s 3.3 percent female-headed single-parent households were living in poverty 461 HE-14 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT Residents Living Below the Poverty Level Families with incomes below the poverty level, specifically those with extremely low and very low incomes, are at the greatest risk of becoming homeless and often require assistance in meeting their rent and mortgage obligations in order to prevent homelessness. Census data suggest that four percent of all Cupertino residents were living below the poverty level in 2010. Specifically, about three percent of family households and two percent of families with children were living below the poverty level. These households may require specific housing solutions such as deeper income targeting for subsidies, housing with supportive services, single-room occupancy units, or rent subsidies and vouchers. Homeless Demand for emergency and transitional shelter in Cupertino is difficult to determine given the episodic nature of homelessness. Generally, episodes of homelessness among families or individuals can occur as a single event or periodically. The county-wide 2013 Santa Clara County Homeless Census & Survey reported a point-in-time count of 7,631 homeless people on the streets and in emergency shelters, transitional housing, and domestic violence shelters throughout the County. This estimate includes 112 homeless individuals in Cupertino. The count, however, should be considered conservative because many unsheltered homeless individuals may not be visible at street locations, even with the most thorough methodology. Shelters acorss Santa Clara county provide for thousands of homeless people and families seeking assistance 462 HE-15 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT REGIONAL HOUSING NEEDS ALLOCATION Pursuant to California Government Code Section 65584, the State, regional councils of government (in this case, ABAG), and local governments must collectively determine each locality’s share of regional housing need (RHNA). In conjunction with the State mandated housing element update cycle that requires Bay Area jurisdictions to update their elements by January 31, 2015, ABAG has determined housing unit production needs for each jurisdiction within the Bay Area. These allocations set housing production goals for the planning period that runs from January 1, 2014 through October 31, 2022 (Table HE-4). Low income households may require specific housing solutions due to a greater risk for issues such as homelessness TABLE HE-4: RHNA, CUPERTINO, 2014-2022 Income Category Projected NeedPercent of Total Extremely Low/Very Low (0-50% of AMI)356 33.5% Low (51-80% of AMI)207 19.5% Moderate (81-120% of AMI)231 21.7% Above Moderate (over 120% AMI)270 25.4% Total Units 1,064 100.0% Source: ABAG Regional Housing Needs Assessment, 2014. 463 HE-16 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT Progress toward the Regional Housing Needs Allocation The City of Cupertino may count housing units constructed, approved, or proposed since January 1, 2014 toward satisfying its RHNA goals for this planning period. Between January 1 and May 31, 2014, building permits for 14 single-family housing units and three second units were approved in Cupertino. In addition, six single-family homes and seven apartments received Planning approvals. Also included in the RHNA credits are 32 second units projected to be developed within the planning period. This projection is based on historical approvals of second units during the past Housing Element planning period. With these credits, the City has a remaining RHNA of 1,002 units: 356 extremely low/very low-income units, 207 low-income units, 196 moderate-income units, and 243 above moderate- income units. HOUSING RESOURCES Overview of Available Sites for Housing The purpose of the adequate sites analysis is to demonstrate that a sufficient supply of land exists in the City to accommodate the fair share of the region’s housing needs during the RHNA projections period (January 1, 2014 – October 31, 2022). The Government Code requires that the Housing Element include an “inventory of land suitable for residential development, including vacant sites and sites having the potential for redevelopment” (Section 65583[a] [3]). It further requires that the element analyze zoning and infrastructure on these sites to ensure housing development is feasible during the planning period. Cupertino faces regional growth demands while undergoing a transformation from a traditional suburban residential community to one that increasingly reflects more The Association of Bay Area Governments (ABAG) helps determine each areas share of the regional housing need 464 HE-17 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT urban characteristics: public gathering spaces, increased shopping and entertainment choices conveniently located near housing, and jobs within an urban core. Cupertino historically has more jobs than housing. When this imbalance is multiplied across adjacent cities, regional consequences include high housing costs, sprawl into outlying areas, congestion of the transportation system, and increased air pollution. The General Plan’s development allocation policies are intended to improve the jobs/housing balance by increasing potential housing units and tempering non- residential growth. The General Plan controls the amount of commercial, office, hotel, and residential uses that can be built through development allocations in terms of square feet (commercial and office), rooms (hotel), and units (residential). Through a comprehensive General Plan Amendment adopted in fall 2014, the City conducted extensive community engagement and resource analyses to identify strategies to replenish, re-allocate, and increase office, commercial, hotel, and residential allocations citywide to plan for future development activity, all the while balancing regional growth pressures with strongly held community desire to maintain Cupertino’s character and quality of life. Figure HE-1 indicates the available residential development opportunity sites to meet and exceed the identified housing need. The opportunity sites can accommodate infill development of up to 1,386 residential units on properties zoned for densities of 20 dwelling units to the acre or more. The potential sites inventory is organized by geographic area and in particular, by mixed use corridors. As shown in Table HE-5, a large proportion of the near-term development potential lies within the Heart of the City Special Area. An additional potential site is located in the North Vallco Park Special Area. Cupertino has historically had more jobs then housing 465 HE-18 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT Figure HE-1 Housing Element Sites to Meet the RHNA North Vallco Park: 344 Units Heart of the City: 1,042 Units Sunnyvale Santa Clara San Jose Los Altos Site 5 93 units Site 1 235 units Site 4 103 units Site 6 11 units Site 3 344 units Site 2 600 units 01000 0500 20003000 0 0.5 1Mile 1000 Feet Meters Special Areas Legend City Boundary Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas North Vallco Park Heart of the City Housing Elements Sites VTA Priority Development Area (PDA) Site units Site Number: Realistic Capacity. Note: Realistic capacity is 85% of maximum capacity allowed under Alternative C 466 HE-19 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT HOUSING PLAN This section presents the quantified objectives for new housing unit construction, conservation, and rehabilitation during the 2014-2022 planning period, as well as the policies and strategies to meet these objectives and address local housing needs. Policies and strategies are grouped into the following goals: ƒƒGoal HE-1: An Adequate Supply of Residential Units for all Economic Segments TABLE HE-5: SUMMARY OF RESIDENTIAL CAPACITY ON SITES TO MEET THE RHNA Site General Plan/Zoning Special Area Max Density (DUA) Max Height Realistic Capacity (units) Site 1 (The Oaks Shopping Center) C/O/R P(CG, Res, OP) Heart of the City 35 45 ft; or 60 ft with retail 235 Site 2 (Vallco Shopping District) C/O/R P(Regional Shopping, OP, Res) Heart of the City 35 45 ft; or 60 ft with retail; or 75-90 ft in certain locations* with community benefits 600 max Site 3 (The Hamptons)High Density P(Res) North Vallco Park 65 75 ft; or 60 ft in certain locations*;344 Site 4 (United Furniture/ East of East Estates Dr) C/O/R P(CG, Res) Heart of the City 25 45 ft 103 Site 5 (Glenbrook Apartments) Medium Density R3(10-20) Heart of the City 20 45 ft 93 Site 6 (Barry Swenson)C/O/RP(CG, Res) Heart of the City 25 45 ft 11 Total 1,386 Notes: Site 2 (Vallco) height allowance to 75 feet is applicable only with community benefits and only for a 200 foot depth along the west Wolfe Rd. property line and set back 200 feet from the Stevens Creek Blvd. property line. Height allowance to 90 feet only with community benefits and only east of Wolfe. Site 3 (Hamptons) height limit of 60 feet is applicable for buildings located within 50 feet of property lines abutting Wolfe Rd, Pruneridge Ave. & Apple Campus 2 site. For more detail on height limits, see Land Use and Community Design Element, Figure LU-1. 467 HE-20 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT ƒƒGoal HE-2: Housing that is Affordable for a Diversity of Cupertino Households ƒƒGoal HE-3: Enhanced Residential Neighborhoods ƒƒGoal HE-4: Energy and Water Conservation ƒƒGoal HE-5: Services for Extremely Low-Income Households and Special Needs Neighborhoods ƒƒGoal HE-6: Equal Access to Housing Opportunities ƒƒGoal HE-7: Coordination with Regional Organizations and Local School Districts This section also identifies the responsible party and timeline for each implementation strategy. Quantified Objectives Table HE-6 outlines the proposed housing production, rehabilitation, and conservation objectives for the eight- year Housing Element planning period. TABLE HE-6: QUANTIFIED OBJECTIVES Income Category New Construction (RHNA)RehabilitationConservation Extremely Low 178 10 8 Very Low 178 10 Low 207 20 Moderate 231 Above Moderate 270 Total 1,064 40 8 Source: City of Cupertino, 2014 468 HE-21 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT Policy HE-1.1: Provision of Adequate Capacity for New Construction Need Designate sufficient land at appropriate densities to accommodate Cupertino’s Regional Housing Needs Allocation of 1,064 units for the 2014-2022 planning period. Policy HE-1.2: Housing Densities Provide a full range of densities for ownership and rental housing. Policy HE-1.3: Mixed Use Development Encourage mixed-use development near transportation facilities and employment centers. Implementing Strategies Strategy 1: Land Use Policy and Zoning Provisions. To accommodate the Regional Housing Needs Allocation (RHNA), the City will continue to: ƒƒProvide adequate capacity through the Land Use Element and Zoning Ordinance to accommodate the RHNA of 1,064 units while maintaining a balanced land use plan that offers opportunities for employment growth, commercial/retail activities, services, and amenities. ƒƒMonitor development standards to ensure they are adequate and appropriate to facilitate a range of housing in the community GOAL HE-1 AN ADEQUATE SUPPLY OF RESIDENTIAL UNITS FOR ALL ECONOMIC SEGMENTS 469 HE-22 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT ƒƒMonitor the sites inventory and make it available on the City website. Monitor development activity on the Housing Opportunity Sites to ensure that the City maintains sufficient land to accommodate the RHNA during the planning period. In the event a housing site listed in the Housing Element sites inventory is redeveloped with a non-residential use or at a lower density than shown in the Housing Element sites inventory, ensure that the City has adequate capacity to meet the RHNA by making the findings required by Government Code Section 65863 and identifying alternative site(s) within the City if needed. Strategy 2: Second Dwelling Units. The City will continue to implement the Second Dwelling Unit Ordinance and encourage the production of second units. Responsible Agencies: Cupertino Department of Community Development/ Planning Division Time Frame: Ongoing Funding Sources:None required Quantified Objectives: 1,064 units (178 extremely low-, 178 very low-, 207 low-, 231 moderate- and 270 above moderate-income units) Responsible Agencies: Cupertino Department of Community Development/ Planning Division Time Frame: Ongoing Funding Sources:None required Quantified Objectives:Four second units annually for a total of 32 units over eight years 470 HE-23 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT Strategy 3: Lot Consolidation. To facilitate residential and mixed use developments, the City will continue to: ƒƒEncourage lot consolidation when contiguous smaller, underutilized parcels are to be redeveloped ƒƒEncourage master plans for such sites with coordinated access and circulation ƒƒProvide technical assistance to property owners of adjacent parcels to facilitate coordinated redevelopment where appropriate ƒƒEncourage intra- and inter-agency cooperation in working with applicants at no cost prior to application submittal for assistance with preliminary plan review. Strategy 4: Flexible Development Standards. The City recognizes the need to encourage a range of housing options in the community. The City will continue to: ƒƒOffer flexible residential development standards in planned residential zoning districts, such as smaller lot sizes, lot widths, floor area ratios and setbacks, particularly for higher density and attached housing developments ƒƒConsider granting reductions in off-street parking on a case-by-case basis for senior housing. Cupertino will encourage the development of mixed-use centers Responsible Agencies: Cupertino Department of Community Development/ Planning Division Time Frame: Ongoing Funding Sources:None required Quantified Objectives:N/A 471 HE-24 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT Strategy 5: To reduce constraints to housing development, and in order to ensure that the designated sites can obtain the realistic capacity shown in the Housing Element, the City will review revisions to the Heart of the City Specific Plan residential density calculation requirement, to eliminate the requirement to net the non-residential portion of the development from the lot area. Policy HE-4: Housing Mitigation Ensure that all new developments—including market-rate residential developments—help mitigate project-related impact on affordable housing needs. The Housing Element should identify land at appropriate densities to accommodate the Regional Housing Needs Allocation (RHNA) Responsible Agencies: Cupertino Department of Community Development/ Planning Division Time Frame: Ongoing Funding Sources:None required Quantified Objectives:N/A Responsible Agencies: Cupertino Department of Community Development/ Planning Division Time Frame: 2016 Funding Sources:None required Quantified Objectives:N/A GOAL HE-2 HOUSING IS AFFORDABLE FOR A DIVERSITY OF CUPERTINO HOUSEHOLD 472 HE-25 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT Policy HE-5: Range of Housing Types Encourage the development of diverse housing stock that provides a range of housing types (including smaller, moderate cost housing) and affordability levels. Emphasize the provision of housing for lower- and moderate-income households including wage earners who provide essential public services (e.g., school district employees, municipal and public safety employees, etc.) Policy HE-6: Development of Affordable Housing and Housing for Persons with Special Needs Maintain and/or adopt appropriate land use regulations and other development tools to encourage the development of affordable housing. Make every reasonable effort to disperse units throughout the community but not at the expense of undermining the fundamental goal of providing affordable units. Implementing Strategies Strategy 6: Office and Industrial Housing Mitigation Program. The City will continue to implement the Office and Industrial Housing Mitigation Strategy. This strategy requires that developers of office, commercial, and industrial space pay a mitigation fee, which will then be used to support affordable housing in the City of Cupertino. These mitigation fees are collected and deposited in the City’s Below Market-Rate Affordable Housing Fund (BMR AHF). A range of housing options should be encouraged in the community Responsible Agencies: Cupertino Department of Community Development/ Planning Division Time Frame: Ongoing Funding Sources:BMR AHF Quantified Objectives:N/A 473 HE-26 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT Strategy 7: Residential Housing Mitigation Program. The City will continue to implement the Residential Housing Mitigation Program to mitigate the need for affordable housing created by new market-rate residential development. This program applies to all new residential development of one unit or greater. Mitigation includes either the payment of the “Housing Mitigation” fee or the provision of a Below Market-Rate (BMR) unit or units. Projects of seven or more for-sale units must provide on-site BMR units. Projects of six units or fewer for-sale units can either build one BMR unit or pay the Housing Mitigation fee. Developers of market-rate rental units, where the units cannot be sold individually, must pay the Housing Mitigation fee to the BMR AHF. The BMR program specifies the following: a. Priority. To the extent permitted by law, priority for occupancy is given to Cupertino residents, Cupertino full- time employees and Cupertino public service employees as defined in Cupertino’s BMR Policy and Procedures Manual. b. For-Sale Residential Developments. Require 15% for-sale BMR units in all residential developments where the units can be sold individually (including single-family homes, common interest developments, and condominium conversions or allow rental BMR units as allowed in (c)(2) below). c. Rental Residential Developments: To the extent permitted by law, require 15% rental very low and low- income BMR units in all rental residential developments. If the City is not permitted by law to require BMR units in rental residential developments: d. Rental Alternative. Allow rental BMR units in for-sale residential developments, and allow developers of market-rate rental developments to provide on-site rental Lot consolidation will continue to be encouraged for development 474 HE-27 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT BMR units, if the developer: 1) enters into an agreement limiting rents in exchange for a financial contribution or a type of assistance specified in density bonus law (which includes a variety of regulatory relief); and 2) provides very low-income and low-income BMR rental units. e. Affordable Prices and Rents. Establish guidelines for affordable sales prices and affordable rents for new affordable housing and update the guidelines each year as new income guidelines are received; f. Development of BMR Units Off Site. Allow developers to meet all or a portion of their BMR or Housing Mitigation fee requirement by making land available for the City or a nonprofit housing developer to construct affordable housing, or allow developers to construct the required BMR units off site, in partnership with a nonprofit. The criteria for land donation or off-site BMR units (or combination of the two options) will be identified in the Residential Housing Mitigation Manual. g. BMR Term. Require BMR units to remain affordable for a minimum of 99 years; and enforce the City’s first right of refusal for BMR units and other means to ensure that BMR units remain affordable. Development of housing for persons with special needs is a priority for Cupertino Responsible Agencies: Cupertino Department of Community Development/ Planning Division and Housing Division Time Frame: Ongoing Funding Sources:BMR AHF Quantified Objectives:20 BMR units over eight years 475 HE-28 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT Strategy 8: Below Market-Rate (BMR) Affordable Housing Fund (AHF). The City’s BMR AHF will continue to support affordable housing projects, strategies and services, including but not limited to: ƒƒBMR Program Administration ƒƒSubstantial rehabilitation ƒƒLand acquisition ƒƒAcquisition of buildings for permanent affordability, with or without rehabilitation ƒƒNew construction ƒƒPreserving “at-risk” BMR units ƒƒRental operating subsidies ƒƒDown payment assistance ƒƒLand write-downs ƒƒDirect gap financing ƒƒFair housing The City will target a portion of the BMR AHF to benefit extremely low-income households and persons with special needs (such as the elderly, victims of domestic violence, and the disabled, including persons with developmental disabilities), to the extent that these target populations are found to be consistent with the needs identified in the nexus study the City prepares to identify the connection, or “nexus” between new developments and the need for affordable housing. To ensure the mitigation fees continue to be adequate to mitigate the impacts of new development on affordable housing needs, the City will update its Nexus Study for the Housing Mitigation Plan by the end of 2016. The Housing Plan should encourage a diverse stock of housing types 476 HE-29 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT Strategy 9: Housing Resources. Cupertino residents and developers interested in providing affordable housing in the City have access to a variety of resources administered by other agencies. The City will continue to provide information on housing resources and services offered by the County and other outside agencies. These include, but are not limited to: ƒƒMortgage Credit Certificate (MCC) – Santa Clara County Housing and Community Development Department ƒƒFirst-Time Homebuyer Assistance and Developer Loans for Multi-Family Development - Housing Trust Silicon Valley (HTSV) ƒƒHousing Choice Vouchers (Section 8) - Housing Authority of Santa Clara County (HASCC) ƒƒAffordable housing development - Santa Clara County HOME Consortium The City will also continue to explore and pursue various affordable housing resources available at the local, regional, state, and federal levels that could be used to address housing needs in the community. Cupertino’s Below Market Rate Affordable Housing Fund will continue to support affordable housing projects, programs, and services Responsible Agencies: Cupertino Department of Community Development/ Planning Division and Housing Division Time Frame: Ongoing; update Nexus Study by the end of 2016 Funding Sources:BMR AHF Quantified Objectives:N/A 477 HE-30 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT Strategy 10: Surplus Properties for Housing. The City will explore opportunities on surplus properties as follows: ƒƒWork with local public agencies, school districts and churches, to identify surplus properties or underutilized properties that have the potential for residential development. ƒƒEncourage long-term land leases of properties from churches, school districts, and corporations for construction of affordable units. ƒƒEvaluate the feasibility of developing special housing for teachers or other employee groups on the surplus properties. ƒƒResearch other jurisdictions’ housing programs for teachers for their potential applicability in Cupertino. The City will update its Nexus Study for the Housing Mitigation Plan by the end of 2016 Responsible Agencies: Cupertino Department of Community Development/ Housing Division Time Frame: Ongoing Funding Sources:None required Quantified Objectives:N/A Responsible Agencies:Cupertino Department of Community Development/ Planning Division Time Frame: Ongoing; evaluate housing pro- grams for teachers in 2015 Funding Sources:BMR AHF Quantified Objectives:N/A 478 HE-31 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT Strategy 11: Incentives for Affordable Housing Development. The City will continue to offer a range of incentives to facilitate the development of affordable housing. These include: ƒƒFinancial assistance through the City’s Below Market- Rate Affordable Housing Fund (BMR AHF) and CDBG funds ƒƒPartner with CDBG and/or support the funding application of qualified affordable housing developers for regional, state, and federal affordable housing funds, including HOME funds, Low Income Housing Tax Credits (LIHTC), and mortgage revenue bonds ƒƒDensity bonus incentives (see Strategy 12) ƒƒFlexible development standards ƒƒTechnical assistance ƒƒWaiver of park dedication fees and construction tax ƒƒParking ordinance waivers ƒƒExpedited permit processing The City is proposing to join the Santa Clara County HOME Consortium so that HOME funds for eligible affordable housing projects and strategies within the City of Cupertino may be eligible to receive HOME funding. The City’s Below Market Rate Residential Mitigation Program requires all new residential developers to either provide below market rate units or pay a mitigation fee Responsible Agencies:Cupertino Department of Community Development/ Planning Division and Housing Division Time Frame: Ongoing incentives; decision to join HOME Consortium in 2014 Funding Sources:BMR AHF; CDBG; HOME; General Fund Quantified Objectives:N/A 479 HE-32 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT Strategy 12: Density Bonus Ordinance. The City will encourage use of density bonuses and incentives, as applicable, for housing developments which include one of the following: ƒƒAt least 5 percent of the housing units are restricted to very low income residents ƒƒAt least 10 percent of the housing units are restricted to lower income residents ƒƒAt least 10 percent of the housing units in a for-sale common interest development are restricted to moderate income residents. ƒƒThe project donates at least one acre of land to the city or county large enough for 40 very low income units; the land has the appropriate general plan designation, zoning, permits, approvals, and access to public facilities needed for such housing; funding has been identified; and other requirements are met. A density bonus of up to 20 percent must be granted to projects that contain one of the following: ƒƒThe project is a senior citizen housing development (no affordable units required) ƒƒThe project is a mobile home park age restricted to senior citizens (no affordable units required) For projects that contain on-site affordable housing, developers may request one to three regulatory concessions, which must result in identifiable cost reductions and be needed to make the housing affordable. The City will update the density bonus ordinance as necessary to respond to future changes in State law. Affordable housing development will continue to be incentivized by the City 480 HE-33 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT Strategy 13: Extremely Low-Income Housing and Housing for Persons with Special Needs. The City will continue to encourage the development of adequate housing to meet the needs of extremely low-income households and persons with special needs (such as the elderly, victims of domestic violence, and the disabled, including persons with developmental disabilities). Specifically, the City will consider the following incentives: ƒƒProvide financing assistance using the Below Market-Rate Affordable Housing Fund (BMR AHF) and Community Development Block Grant funds (CDBG). ƒƒAllow residential developments to exceed planned density maximums if they provide special needs housing and the increase in density will not overburden neighborhood streets or hurt neighborhood character. ƒƒGrant reductions in off-street parking on a case-by-case basis. ƒƒPartner with and/or support the funding application of qualified affordable housing developers for regional, state, and federal affordable housing funds, including HOME funds, Low Income Housing Tax Credits (LIHTC), and mortgage revenue bond. The City’s Density Bonus Ordinance will be updated to respond to changes in the law Responsible Agencies Cupertino Department of Community Development/ Planning Division and Housing Division Time Frame Ongoing Funding SourcesNone Required Quantified Objectives N/A 481 HE-34 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT Strategy 14: Employee Housing. The City permits employee housing in multiple zoning districts. Pursuant to the State Employee Housing Act, any employee housing consisting of no more than 36 beds in a group quarters or 12 units or spaces designed for use by a single family or household shall be deemed an agricultural land use. No conditional use permit, zoning variance, or other zoning clearance shall be required of this employee housing that is not required of any other agricultural activity in the same zone. The permitted occupancy in employee housing in a zone allowing agricultural uses shall include agricultural employees who do not work on the property where the employee housing is located. The Employee Housing Act also specifies that housing for six or fewer employees be treated as a residential use. The City amended the Zoning Ordinance to be consistent with the State law in 2014 and will continue to comply with the Employee Housing Act where it would apply. The City will continue to encourage the development of low income housing for communities with special needs, such as the elderly Responsible Agencies Cupertino Department of Community Development/ Housing Division Time Frame Ongoing Funding Sources BMR AHF; CDBG; HOME Quantified Objectives N/A Responsible Agencies Cupertino Department of Community Development/ Planning Division and Housing Division Time Frame Ongoing Funding Sources None Required Quantified Objectives N/A 482 HE-35 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT Policy HE-7: Housing Rehabilitation Pursue and/or provide funding for the acquisition/ rehabilitation of housing that is affordable to very low-, low-, and moderate-income households. Actively support and assist non-profit and for-profit developers in producing affordable units. Policy HE-8: Maintenance and Repair Assist lower-income homeowners and rental property owners in maintaining and repairing their housing units. Policy HE-9: Conservation of Housing Stock The City’s existing multi-family units provide opportunities for households of varied income levels. Preserve existing multi-family housing stock by preventing the net loss of multi-family housing units in new development and the existing inventory of affordable housing units that are at risk of converting to market-rate housing. Implementing Strategies Strategy 15: Residential Rehabilitation. The City will continue to: ƒƒUtilize its Below Market-Rate Affordable Housing Fund (BMR AHF) and Community Development Block Grant (CDBG) funds to support residential rehabilitation efforts in the community. These include: ƒƒAcquisition/rehabilitation of rental housing ƒƒRehabilitation of owner-occupied housing The City of Cupertino permits farmworker housing in agricultural districts GOAL HE-3 STABLE AND PHYSICALLY SOUND RESIDENTIAL NEIGHBORHOODS 483 HE-36 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT ƒƒProvide assistance for home safety repairs and mobility/ accessibility improvements to income-qualified owner- occupants using CDBG funds. The focus of this strategy is on the correction of safety hazards. ƒƒPartner with and/or support the funding application of qualified affordable housing developers for regional, state, and federal affordable housing funds, including HOME funds, Low Income Housing Tax Credits (LIHTC), and mortgage revenue bonds. Strategy 16: Preservation of At-Risk Housing Units. One housing project – Beardon Drive (eight units) – is consid- ered at risk of converting to market-rate housing during the next ten years. The City will proactively contact the property owner regarding its intent to remain or opt of the afford- able program. In the event the project becomes at risk of converting to market-rate housing, the City will work with the property owner or other interested nonprofit housing providers to preserve the units. The City will continue to monitor its entire portfolio of affordable housing for-sale and rental inventory annually. The City will monitor its affordable for-sale inventory by requiring Below Market-Rate (BMR) homeowners to submit The City shall continue to support the rehabilitation of very low, low, and moderate income housing Responsible Agencies Cupertino Department of Community Development/ Housing Division; West Valley Community Services Time Frame Ongoing Funding Sources BMR AHF; CDBG; HOME Quantified Objectives Rehabilitate five units per year for a total of 40 years over eight years 484 HE-37 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT proof of occupancy such as utility bills, mortgage loan documentation, homeowner’s insurance, and property tax bills. The City will further monitor its affordable for-sale inventory by ordering title company lot books, reviewing property profile reports and updating its public database annually. The City will monitor its affordable rental inventory by verifying proof of occupancy and performing annual rental income certifications for each BMR tenant. The City records a Resale Restriction Agreement against each affordable BMR for-sale unit and a Regulatory Agreement for BMR rental units to help ensure long-term affordability. To help further preserve the City’s affordable housing stock, the City may consider providing assistance to rehabilitate and upgrade the affordable units as well. Strategy 17: Condominium Conversion. The existing Condominium Conversion Ordinance regulates the conversion of rental units in multi-family housing development in order to preserve the rental housing stock. Condominium conversions are not allowed if the rental vacancy rate in Cupertino and certain adjacent areas is less than five percent at the time of the application for conversion and has averaged five percent over the The City will use BMR AHF and CDBG to support residential rehabilitation throughout Cupertino Responsible Agencies Cupertino Department of Community Development/ Housing Division Time Frame Annually monitor status of affordable projects; contact property owner of at risk project at least one year in advance of potential conversion date. Funding Sources BMR AHF; CDBG; HOME Quantified Objectives N/A 485 HE-38 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT past six months. The City will continue to monitor the effectiveness of this ordinance in providing opportunities for homeownership while preserving a balanced housing stock with rental housing. Strategy 18: Housing Preservation Program. When a proposed development or redevelopment of a site would cause a loss of multi-family housing, the City will grant approval only if: ƒƒThe project will comply with the City’s Below Market-Rate Program, ƒƒThe number of units provided on the site is at least equal to the number of existing units, and ƒƒAdverse impacts on displaced tenants, in developments with more than four units, are mitigated. The City will continue to monitor housing that is considered at risk for converting to market-rate housing Responsible Agencies Cupertino Department of Community Development/ Planning Division Time Frame Ongoing Funding Sources None required Quantified Objectives N/A Responsible Agencies Cupertino Department of Community Development /Planning Division and Housing Division Time Frame Ongoing Funding Sources None Required Quantified Objectives N/A 486 HE-39 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT Strategy 19: Neighborhood and Community Clean-Up Campaigns. The City will continue to encourage and spon- sor neighborhood and community clean-up campaigns for both public and private properties. Policy HE-10: Energy and Water Conservation Encourage energy and water conservation in all existing and new residential development. Implementing Strategies Strategy 20: Enforcement of Title 24. The City will contin- ue to enforce Title 24 requirements for energy conservation and will evaluate utilizing some of the other suggestions as identified in the Environmental Resources/Sustainability element. The City will monitor its portfolio of affordable for-sale and rental housing annually Responsible Agencies Cupertino Department of Community Development Time Frame Ongoing Funding Sources General Funds Quantified Objectives N/A GOAL HE-4 ENERGY AND WATER CONSERVATION Responsible Agencies Cupertino Department of Community Development Department/Building Division Time Frame Ongoing Funding Sources None Required Quantified Objectives N/A 487 HE-40 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT Strategy 21: Sustainable Practices. The City will continue to implement the Landscape Ordinance for water conservation and the Green Building Ordinance (adopted in 2013) that applies primarily to new residential and nonresidential development, additions, renovations, and tenant improvements of ten or more units. To further the objectives of the Green Building Ordinance, the City will evaluate the potential to provide incentives, such as waiving or reducing fees, for energy conservation improvements at affordable housing projects (existing or new) with fewer than ten units to exceed the minimum requirements of the California Green Building Code. This City will also implement the policies in its climage action pan to acheive residential-focused greenhouse gas emission recutions and further these community energy and water conservation goals Community clean up campaigns will continue to be sponsored for both public and private properties GOAL HE-5 SPECIAL SERVICES FOR LOWER-INCOME AND SPECIAL NEEDS HOUSEHOLDS Responsible Agencies Cupertino Department of Community Development/ Planning Division and Building Division Time Frame Ongoing; consider further incentives in 2015 to encourage green building practices in smaller developments Funding Sources None Required Quantified Objectives N/A 488 HE-41 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT Policy HE-11: Lower-Income and Special Needs Households Support organizations that provide services to lower-income households and special need households in the City, such as the homeless, elderly, disabled and single parent households. Implementing Strategies Strategy 22: Emergency Shelters. The City will continue to facilitate housing opportunities for special needs persons by allowing emergency shelters as a permitted use in the “BQ” Quasi-Public zoning district. The City will subject emergency shelters to the same development standards as other similar uses within the BQ zoning district, except for those provisions permitted by State law and provided in the Zoning Ordinance for emergency shelters. Strategy 23: Supportive Services for Lower-Income Households and Persons with Special Needs. The City will continue to utilize its Below Market-Rate Affordable Housing Fund, Community Development Block Grant (CDBG) funds, and General Fund Human Service Grants (HSG) funds to provide for a range of supportive services for lower-income households and persons with special needs. The City’s Landscape Ordinance will continue to be implemented for water conservation Responsible Agencies Cupertino Department of Community Development/ Planning Division Time Frame Ongoing Funding Sources None Required Quantified Objectives N/A 489 HE-42 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT Strategy 24: Rotating Homeless Shelter. The City will continue to support the operation of a Rotating Homeless Shelter program. Policy HE-12: Housing Discrimination The City will work to eliminate on a citywide basis all unlawful discrimination in housing with respect to age, race, The City will continue to provide Fair Housing services for all residents of Cupertino Responsible Agencies Cupertino Department of Community Development/ Housing Division Time Frame Annually through the Action Plan funding application process allocate CDBG and HSG to organizations that cater to the needs of lower income and special needs households Funding Sources BMR AHF; CDBG; HSG Quantified Objectives N/A GOAL HE-6 EQUAL ACCESS TO HOUSING OPPORTUNITIES Responsible Agencies Cupertino Department of Community Development/ Housing Division; Faith in Action Time Frame Ongoing Funding Sources CDBG; HSG; BMR AHF Quantified Objectives N/A 490 HE-43 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT sex, sexual orientation, marital or familial status, ethnic background, medical condition, or other arbitrary factors, so that all persons can obtain decent housing. Implementing Strategies Strategy 25: Fair Housing Services. The City will continue to: ƒƒProvide fair housing services, which include outreach, education, counseling, and investigation of fair housing complaints. ƒƒRetain a fair housing service provider to provide direct services for residents, landlords, and other housing professionals. ƒƒCoordinate with efforts of the Santa Clara County Fair Housing Consortium to affirmatively further fair housing. Distribute fair housing materials produced by various organizations at public counters and public events. A 2010 zoning amendment allows for emergency shelters as a matter of right in the Quasi-Public zoning district Responsible Agencies Cupertino Department of Community Development/ Housing Division; Santa Clara County Fair Housing Consortium; Eden Council for Hope and Opportunity (ECHO) Time Frame Ongoing Funding Sources BMR AHF; CCDBG Quantified Objectives N/A 491 HE-44 2040 GENERAL PLAN City of Cupertino REVISED PUBLIC DRAFT Policy HE-13: Coordination with Local School Districts The Cupertino community places a high value on the excellent quality of education provided by the three public school districts which serve residents. To ensure the long-term sustainability of the schools in tandem with the preservation and development of vibrant residential areas, the City will continue to coordinate with the Cupertino Union School District (CUSD), Fremont Union High School District (FUHSD), and Santa Clara Unified School District (SCUSD). Policy HE-14: Coordination with Regional Efforts to Address Housing-Related Issues Coordinate efforts with regional organizations, including ABAG and the Bay Area Air Quality Management District (BAAQMD), as well as neighboring jurisdictions, to address housing and related quality of life issues (such as air quality and transportation). Policy HE-15: Public-Private Partnerships Promote public-private partnerships to address housing needs in the community, especially housing for the workforce. Implementing Strategies Strategy 26: Coordination with Outside Agencies and Organizations. The City recognizes the importance of partnering with outside agencies and organizations in The City shall continue to support the operation of rotating homeless shelters GOAL HE-7 COORDINATION WITH REGIONAL ORGANIZATIONS AND LOCAL SCHOOL DISTRICTS 492 HE-45 CHAPTER 4 Housing Element REVISED PUBLIC DRAFT addressing local and regional housing issues. These may include, but are not limited to, the following: ƒƒSchool districts ƒƒHousing providers ƒƒNeighboring jurisdictions ƒƒAssociation of Bay Area Governments (ABAG) ƒƒAir Quality Management District ƒƒHousing Trust Silicon Valley ƒƒSanta Clara County Fair Housing Consortium ƒƒSanta Clara County HOME Consortium ƒƒSanta Clara County Continuum of Care (COC) ƒƒHousing Authority of Santa Clara County (HASCC) ƒƒValley Transportation Authority (VTA) Specifically, the City will meet with these agencies/ organizations periodically to discuss the changing needs, development trends, alternative approaches, and partnering opportunities. The City will continue work to eliminate unlawful housing discrimination Responsible Agencies Cupertino Department of Community Development Planning Division and Housing Division Time Frame Ongoing Funding Sources None Required Quantified Objectives N/A 493 Housing Element Technical Report Appendix B HOUSING ELEMENT TECHNICAL REPORT Appendix B B 494 REVISED PUBLIC DRAFT B-2 Housing Commission Attachment B 495 B-3 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT INTRODUCTION Cupertino is a unique community with a high quality of life, a renowned school system, and a robust high-technology economy. The long-term vitality of Cupertino and the local economy depend upon the availability of all types of housing to meet the community’s diverse housing needs. As Cupertino looks towards the future, increasing the range and diversity of housing options will be integral to the City’s success. Consistent with the goal of being a balanced community, this Housing Element continues the City’s commitment to ensuring new opportunities for residential development, as well as for preserving and enhancing our existing neighborhoods. The Housing Element Technical Report describes the City of Cupertino’s procedures and Municipal Code as of 2014. This Report does not limit the City’s ability to amend or repeal the procedures or ordinances so long as these changes are not inconsistent with the policies in this Report. 1.1 Role and Content of Housing Element This Housing Element is a comprehensive eight-year plan to address the housing needs in Cupertino. The Housing Element is the City’s primary policy document regarding the development, rehabilitation, and preservation of housing for all economic segments of the population. Per State Housing Element law, the document must be periodically updated to: ƒƒOutline the community’s housing production objectives consistent with State and regional growth projections ƒƒDescribe goals, policies and implementation strategies to achieve local housing objectives ƒƒExamine the local need for housing with a focus on special needs populations CONTENTS B-3 Introduction B-10 Housing Needs Assessment B-69 Regional Housing Need Determination B-71 Housing Constraints B-126 Housing Resources B-158 Analysis General Plan Consistency B-163 Supplemental Materials 496 B-4 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT ƒƒIdentify adequate sites for the production of housing serving various income levels ƒƒAnalyze potential constraints to new housing production ƒƒEvaluate the Housing Element for consistency with other General Plan elements Housing element law continually evolves. This element for the 2014-2022 planning period addresses all laws adopted since the element was last updated in 2010. SB 812 requires that the City assess the housing needs of developmentally disabled persons. SB 244, which does not pertain to the housing element per se but is triggered by a housing element update requires that cities and counties address the infrastructure needs of disadvantaged unincorporated communities within the jurisdiction’s designated sphere of influence. According to data from the California Department of Water Resources, Cupertino contains no disadvantaged communities within its sphere of influence. This updated Housing Element focuses on housing needs from January 31, 2015 through January 31, 2023, in accordance with the housing element planning period for San Francisco Bay Area jurisdictions established by State law. Relationship to the General Plan State law requires that a General Plan and its constituent elements “comprise an integrated, internally consistent and compatible statement of policies. ”This implies that all elements have equal legal status; no one element is subordinate to any other element. This Housing Element must be consistent with the policies and proposals set forth by the General Plan, including the Land Use and Circulation Elements. Additionally, environmental constraints identified in the Health and Safety Element and the Environmental 497 B-5 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Resources/Sustainability Element are recognized in the Housing Element. When an element in the General Plan is amended, the Housing Element will be reviewed and modified as necessary to ensure continued consistency among the various elements. The City will ensure that updates to these elements achieve internal consistency with the Housing Element as well. 1.2 Public Participation This Housing Element has been developed with extensive participation from members of the Cupertino community. The public participation process described below engaged a diverse set of community stakeholders in a productive dialogue on housing issues. Participants included community members, property owners, housing developers, service providers, school districts, and the business community. Meeting and workshop announcements and agendas, as well as presentation materials and web cast archives of all stakeholder and community meetings, were posted on the City’s website. A postcard advertising meetings (February 19, March 4, March 11, and April 1) was direct mailed to all Cupertino addresses to ensure that all economic segments of the community were invited to participate. Email notification for all meetings was sent to persons requesting information about the General Plan Update (over 300 persons). The paragraphs below summarize the outreach activities and meetings in more detail. Stakeholder Interviews To inform the Cupertino Housing Element update and identify key housing needs, issues, and opportunities, the update team interviewed approximately 25 stakeholders. Most of the stakeholders were interviewed in small groups organized by interest, including community advocates, 498 B-6 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT economic development, service providers, school districts, and property owners/developers. The team conducted six group interviews and one individual interview. To ensure that the concerns of low- and moderate-income and special needs residents were addressed, agencies and organizations that serve the low- and moderate-income and special needs community were invited to participate in the stakeholder interviews. Section 7 includes a list of invited and interviewed parties as well as a summary of key themes and findings. Joint Planning Commission/Housing Commission Workshop On January 23, 2014 the Planning Commission and Housing Commission hosted a joint workshop to begin discussion on potential housing sites. Eleven participants broke into small groups and identified potential future sites and the criteria for increasing density in certain areas. Housing Commission Workshop On February 12, 2014, the Housing Commission hosted a workshop to continue the sites discussion and prioritize sites for inclusion in the Housing Element. Following a project update presentation, the 15 participants broke into groups to prioritize potential housing sites, with the goal of showing adequate capacity to achieve a housing production goal of 1,064 units, consistent with Cupertino’s Regional Housing Needs Allocation (RHNA) for 2014-2022. Planning Commission Open House and Study Session On February 19, 2014, the Planning Commission hosted an open house and study session to provide a public forum to continue the Housing Element sites discussion. A public hearing nwas conducted on the item and the Planning Commission recommended criteria to focus the 499 B-7 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT sites selection. Specifically, the Commission recommended removing sites that were viewed as unviable (successful shopping centers, sites with existing established institutional uses, and small sites with low yield or no property owner interest). The Planning Commission recommended including sites that would further three goals: ƒƒDistribute housing throughout the city ƒƒEncourage development along the Priority Development Area designated by the One Bay Area plan ƒƒMinimize impacts to schools City Council Study Session On March 4, 2014 the City Council held a study session to discuss in depth the potential housing sites that would be analyzed in the environmental document to be prepared for the Housing Element update and parallel amendments to the Land Use and Circulation Elements. A public hearing was conducted on the item and community members had the opportunity to comment on the Housing Element and housing sites. Environmental Review Scoping Meeting On March 11, 2014, the City held a scoping meeting to discuss the environmental review of the combined General Plan Amendment and Housing Element update. The meeting provided an opportunity for the community to comment on the scope and content of the planned Environmental Impact Report (EIR). 500 B-8 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Housing Commission Meeting on Housing Policy On March 19, 2014, the Housing Commission held a study session to discuss revisions to housing goals, policies, and strategies associated with the Housing Element update. A public hearing was conducted on the item and five community members attended. Joint City Council/Planning Commission Meeting on Housing Policy On April 1, 2014, the Planning Commission and City Council held a joint study session to discuss revisions to housing goals, policies, and strategies included in the Housing Plan section of the 2014-2022 Housing Element. A public hearing was conducted on the item and community members had the opportunity to comment on the Housing Element Housing Plan. 1.3 Incorporation of Community Feedback At the February 19, 2014 Planning Commission open house and study session, participants emphasized that future development should reflect the character of the City and neighborhoods in which they are located. They also expressed the need to distribute housing throughout Cupertino and for smaller unit affordable rental housing. In response, the residential sites inventory includes sites outside the City’s core as a means to distribute housing production citywide. The Housing Element also includes Policy HE-5: Range of Housing Types, which encourages the development of diverse housing stock that provides a range of housing types (including smaller, moderate cost housing) and affordability levels. A concern about the viability of mixed use was also expressed during the community outreach activities. Participants and decision makers noted that developers 501 B-9 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT are interested in developing the residential portion of a project and do not include substantial commercial uses. To reflect this concern, the site suitability analysis—conducted to identify appropriate sites for inclusion in the Housing Element—used locational criteria to select sites that could best facilitate mixed use development, especially at corner properties where commercial uses are most viable. Participants at the March 19, 2014 Housing Commission Study Session suggested that energy conservation mechanisms can provide cost savings and result in more affordable housing costs. Existing goals and policies support energy conservation for all residential construction. In addition, the City will evaluate the potential to provide incentives for affordable development to exceed the minimum requirements of the California Green Building Code. Community members were particularly involved in the site inventory. The inventory of residential opportunity sites was developed in consultation with the Housing Commission, Planning Commission, City Council, and members of the public. At four meetings, commissioners and council members, as well as members of the public, discussed the inventory. During these discussions, several sites were removed and new sites were added based on input from stakeholders. Decisions to add or remove sites were based on realistic expectations for sites to be redeveloped within the planning period. School impacts were a common theme during the site selection process. Staff explained to participants and decision makers that impact to schools may not be a goal of the site selection exercise since Government Code Section 65995 preempts this issue. This law states that school impact mitigation fees are presumed to fully mitigate any school impacts associated with development. To ensure the long-term sustainability of the schools in 502 B-10 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT tandem with the preservation and development of vibrant residential areas, Strategy 26 in the Housing Plan directs the City to continue to coordinate with the Cupertino Union School District (CUSD), Fremont Union High School District (FUHSD), and Santa Clara Unified School District (SCUSD). 1.4 Organization of Housing Element Following this introduction, the Housing Element includes the following components: ƒƒAn analysis of the City’s current and future housing needs ƒƒAn analysis of governmental and non-governmental constraints to housing production ƒƒAn inventory and analysis of housing resources ƒƒA housing plan setting forth goals, policies, strategies, and quantified objectives to address the City’s housing needs Included in the appendix is a thematic summary of the stakeholder interviews, a review of the prior (2007-2014) Housing Element, and a parcel-specific residential sites inventory. 2. HOUSING NEEDS ASSESSMENT The Housing Needs Assessment describes the housing, economic, and demographic conditions in Cupertino; assesses the demand for housing for households at all income levels; and documents the demand for housing to serve special needs populations. The Housing Needs Assessment is intended to assist Cupertino in developing housing goals and formulating policies and strategies that address local housing needs. To facilitate an understanding of how the characteristics 503 B-11 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT of Cupertino are similar to, or different from, other nearby communities, this Housing Needs Assessment presents data for Cupertino alongside comparable data for all of Santa Clara County and, where appropriate, for the San Francisco Bay Area and the state of California. This Needs Assessment incorporates data from numerous sources, including: ƒƒUnited States Census Bureau and American Community Surveys (ACS) ƒƒAssociation of Bay Area Governments (ABAG) ƒƒState of California Department of Housing and Community Development (HCD) ƒƒState of California Departments of Finance, ƒƒState of California Employment and Development Department, State of California Department of Social Services ƒƒState of California Department of Public Health ƒƒUnited States Department of Housing and Urban Development (HUD) Comprehensive Housing Affordability Strategy (CHAS) ƒƒ Housing Authority of the County of Santa Clara ƒƒ Santa Clara County Homeless Census ƒƒVeronica Tam and Associates (Housing Element Consultant) ƒƒCity of Cupertino Community Development Department (CDD) ƒƒ211 Santa Clara County ƒƒCraigslist.org 504 B-12 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT ƒƒZillow.com ƒƒDQNews.com Specific data sources used are identified in each table or figure. 2.1 Regional Context Cupertino is a suburban city of 10.9 square miles located in Santa Clara County. The City incorporated in 1955 and grew from a small agricultural community into a suburban place during the expansion of Silicon Valley. The cities of Los Altos and Sunnyvale limit any potential of expansion of Cupertino to the north, the cities of Santa Clara and San Jose abut Cupertino to the east, and Saratoga is to the immediate west. Unincorporated areas of Santa Clara County form the southern and western boundaries of the City. Cupertino’s built environment is dominated by single-family subdivisions, with distinctive commercial and employment centers separated from the surrounding residential areas. Because of the suburban pattern, the city has a largely automobile-based land use and transportation system. Highway 85 functions as the main north/south traffic route through the city, and Interstate 280 is a major east/west route. 2.2 Population & Household Trends Population As presented in Table 2.1, between 2000 and 2010 the City of Cupertino’s population percent change increased by 15.3 percent, which is at a higher rate than Santa Clara County at 5.9 percent, San Francisco Bay area as a whole at 5.4 percent, and the State of California at 10 percent. During this period, Cupertino grew from 50,546 to 58,302 persons, 505 B-13 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT which translates to an increase of 15.3 percent. This growth was much more significant than the growth experienced by the region overall. However, a portion of this population growth can be attributed to the City’s annexation of 168 acres of land between 2000 and 2008. Cupertino’s annexation of Garden Gate, Monta Vista, and scattered County “islands” added 1,600 new residents. After removing the population increases from these annexations, the City of Cupertino experienced a 12-percent increase in its population during the previous decade. By comparison, Santa Clara County’s population grew by 5.9 percent, while the nine-county Bay Area’s population grew by 5.4 percent. Overall, the state of California’s population grew more similarly to Cupertino’s, with an overall increase of 10 percent. Households A household is defined as a person or group of persons living in a housing unit, as opposed to persons living in group quarters, such as dormitories, convalescent homes, or prisons. According to the American Community Survey (ACS), there were 20,181 households in Cupertino in 2010 (see Table 2.1). The City added approximately 2,000 new households between 2000 and 2010, an increase of 11 percent. Approximately 600 of these households, however, resulted from annexations. After adjusting for household increases due to annexation, the number of households in Cupertino grew by only eight percent between 2000 and 2010. During the same time period, the number of households increased by 6.8 percent in Santa Clara County, 5.8 percent in the Bay Area as a whole and 9.3 percent in the State of California. Average Household Size Average household size is a function of the number of people living in households divided by the number of occupied housing units in a given area. In Cupertino, the 506 B-14 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT average household size in 2011 was 2.83, slightly higher than the Bay Area as a whole at 2.69, but slightly lower than Santa Clara County at 2.89 and the State of California at 2.91 (see Table 2.1). Because population growth has outpaced the increase in households in Cupertino, the average household size has increased since 2000. The contrary is true for the County. Household Type Households are divided into two different types, depending on their composition. Family households are those consisting of two or more related persons living together. Non-family households include persons who live alone or in groups of unrelated individuals. As shown in Table 2.1, Cupertino has a large proportion of family households. In 2011, family households comprised 77.4 percent of all households in the city. Cupertino’s family households figure is higher than Santa Clara County’s family households figure at 70.8 percent and the Bay Area as a whole at 64.8 percent and the State of California at 68.6 percent. As of 2011, Cupertino’s non-family households comprised of 22.6 percent of all households in the city. Cupertino’s 22.6 percent is lower than Santa Clara County at 29.2 percent and the Bay Area as a whole at 35.2 percent and State of California at 31.4 percent. Household Tenure Households in Cupertino are more likely to own than rent their homes. According to Table 2.1, 62.6 percent of Cupertino households owned their homes in 2010, a minimal decrease from 2000. Comparing the City of Cupertino with other jurisdictions, as of 2010, 57.6 percent owned their home in Santa Clara County, 56.2 percent in the Bay Area as a whole and 55.9 percent in the State of California. As of 2010, renter households comprised 37.4 percent of all households in Cupertino, 42.4 percent in Santa Clara County, 43.8 percent in the Bay Area as a whole 507 B-15 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT TABLE 2.1: POPULATION AND HOUSEHOLD TRENDS, 2000-2010/2011 2000 2010/2011 Total Change 2000-2010 Percent Change 2000-2011 City of Cupertino Population 50,546 58,302 7,756 15.3% Households 18,204 20,181 1,977 10.9% Average Household Size (a)2.75 2.83 Household Type (a) Families 74.8%77.4% Non-Families 25.2%22.6% Tenure Owner 63.6%62.6% Renter 36.4%37.4% Santa Clara County Population 1,682,585 1,781,642 99,057 5.9% Households 565,863 604,204 38,341 6.8% Average Household Size (a)2.92 2.89 Household Type (a) Families 69.9%70.8% Non-Families 30.1%29.2% Tenure Owner 59.8%57.6% Renter 40.2%42.4% Bay Area (b) Population 6,783,760 7,150,739 366,979 5.4% Households 2,466,019 2,608,023 142,004 5.8% Average Household Size (a)2.69 2.69 Household Type (a) Families 64.7%64.8% Non-Families 35.3%35.2% Tenure Owner 57.7%56.2% Renter 42.3%43.8% California Population 33,871,648 37,253,956 3,382,308 10.0% Households 11,502,870 12,577,498 1,074,628 9.3% Average Household Size (a)2.87 2.91 Household Type (a) Families 68.9%68.6% Non-Families 31.1%31.4% Tenure Owner 56.9%55.9% Renter 43.1%44.1% Notes: (a) Average household size and household type figures from American Community Survey (ACS), 2007-2011. b) Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, SantaClara, Solano, and Sonoma Counties. Source: Association of Bay Area Governments (ABAG), Housing Element Data Profiles, December 2013. 508 B-16 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT and 44.1 percent in the State of California. Age Distribution Cupertino’s age distribution, shown in Table 2.2, is relatively similar to that of Santa Clara County, with a few notable exceptions. In both Cupertino and Santa Clara County, persons under 20 years old make up over a quarter of the overall population. In the City, the number and proportion of persons in this age group have increased slightly since 2000. However, compared to the County as a whole, Cupertino has a lower proportion of younger adults in the 25 to 34 age range but a higher proportion of older adults (persons 45 to 54 years old). In fact, from 2000 to 2010, the fastest growing segment of the Cupertino community was older adults in the 45 to 54 year old age category, which increased from 15.4 to 17.3 percent of the total population. In contrast, the proportion of other adults (those in the 25 to 44 age cohort) showed the sharpest decline between 2000 and 2010. In addition, Cupertino’s elderly population, residents age 65 and above, increased from 11 percent to 13 percent between 2000 and 2010. TABLE 2.2: AGE DISTRIBUTION, 2000-2010 Age Cohort City of Cupertino Santa Clara County 2000 2010 2000 2010 Under 15 22.4%22.5%20.9%20.2% 15 to 17 4.3%5.1%3.9%3.9% 18 to 20 2.5%2.8%3.9%3.8% 21 to 24 2.7%2.8%5.4%5.1% 25 to 34 12.1%8.6%17.8%15.1% 35 to 44 21.0%18.2%17.6%15.6% 45 to 54 15.4%17.3%13.0%14.8% 55 to 64 8.7%10.2%8.0%10.4% 65 to 74 5.8%6.2%5.2%6.0% 75 to 84 3.8%4.0%3.3%3.5% 85 +1.4%2.2%1.1%1.5% Median Age 37.9 39.9 34.0 36.2 Sources: Association of Bay Area Governments (ABAG), Housing Element Data Profiles, December 2013. 509 B-17 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Household Income According to American Community Survey (ACS) estimates, the median household income in Cupertino in 2011 was $124,825. This figure is significantly higher than the estimated median household income of $89,064 for Santa Clara County.1 Furthermore, 62.3 percent of Cupertino households earned more than $100,000 in 2011, whereas only 45.0 percent of Santa Clara households and 39.0 percent of Bay Area households fall into this income category. On a per capita basis, Cupertino is also wealthier than Santa Clara County. In 2011, the per capita income in Cupertino was $51,965, compared to $40,698 in the County. Table 2.3 summarizes the distribution of household incomes for Cupertino, Santa Clara County, and the Bay Area. The Housing Element law establishes five income categories according to Area Median Income (AMI) for purposes of evaluating housing assistance needs: ƒƒExtremely Low Income (0-30 percent AMI) ƒƒVery Low Income (31-50 percent AMI) ƒƒLow Income (51-80 percent AMI) ƒƒModerate Income (81-120 percent AMI) ƒƒAbove Moderate Income (>120 percent AMI) 1 Median household income and per capita income data are calculated fields by the Census Bureau based on raw data from the American Community Surveys. Without access to the raw data, median and per capita income can- not be calculated for customized region not identified as a Census Designated Place. 510 B-18 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT The State and Federal governments classify household income into various groups based upon its relationship to the County AMI and adjusted for household size. In 2010, 79.2 percent of Cupertino households earned moderate or above-moderate incomes, and only 20.8 percent of useholds earned lower incomes (see Table 2.4).2 In comparison, 67.6 percent of County households earned moderate or above-moderate incomes and 32.4 percent earned lower incomes, including 12.6 percent who earned extremely low incomes. 2.3 Employment Trends & Jobs/Housing Balance Local Employment Opportunities Since 2000 there has been a net increase of over 1,200 jobs held by Cupertino residents, for a total of 25,200 employed residents in 2011. As shown in Table 2.5, the number of jobs held by Cupertino residents grew by 5.2 percent between 2000 and 2011. The City of Cupertino job growth percentage was far greater than the growth experienced by Santa Clara County as a whole at 0.8 percent between 2000 and 2011. Despite this overall growth, most industry sectors experienced a decline in the number of jobs available. Between 2000 and 2011 the largest job losses in employment occurred in the manufacturing and retail trade sectors. These decreases were offset by growth in the professional, scientific, management, administrative, and waste management services industry, which added 1,748 jobs, and the educational, health, and social services industry, which added 1,144 jobs. Even with the recent changes to employment sectors during the previous decade, manufacturing remains the largest job sector for residents of both Cupertino and Santa Clara County. As 2 Data were obtained from the Comprehensive Housing Affordability Strategy (CHAS) prepared for HUD by the Census Bureau using 2006-2010 American Community Survey (ACS) data. 511 B-19 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT TABLE 2.3: HOUSEHOLD INCOME DISTRIBUTION, 2011 Household Income Cupertino Santa Clara County Bay Area Number PercentNumber PercentNumber Percent Less than $24,9991,8449.1%79,05713.2%404,25415.7% $25,000 to $49,9991,9339.6%90,02715.0%440,57517.1% $50,000 to $74,999 1,9659.7%84,59414.1%403,08715.6% $75,000 to $99,9991,8749.3%75,97412.7%324,12312.6% $100,000 or more12,56062.3%269,99845.0%1,005,44139.0% Total 20,176100.0%599,652100.0%2,577,480100.0% Median Household Income $124,825 $89,064 (b) Per Capita Income $51,965 $40,698 (b) TABLE 2.4: HOUSEHOLDS BY INCOME CATEGORY, 2010 Income Category (% of County AMI) Cupertino Santa Clara County Households Percent Households Percent Extremely Low (30% or less)1,485 7.6%75,395 12.6% Very Low (31 to 50%)1,320 6.7%61,830 10.4% Low (51 to 80%)1,260 6.4%56,325 9.4% Moderate or Above (over 80%)15,515 79.2%403,195 67.6% $100,000 or more 19,580 100.0%596,745 100.0% Total 20,176 100.0%599,652 100.0% Source: Department of Housing and Urban Development (HUD), Comprehensive Housing Affordability Strategy (CHAS), based on American Community Survey (ACS), 2006-2010. 512 B-20 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT of 2011, manufacturing jobs comprise 28.1 percent of all jobs held by Cupertino residents and 19.6 percent of jobs held by residents of Santa Clara County overall. The manufacturing sector includes the production of computer, electronic, and communication equipment, with such major employers as Apple and Hewlett-Packard. With the 2008-2012 collapse of the financial and credit markets and the worldwide recession, Cupertino and the broader Silicon Valley region lost some of the gains in key sectors that were achieved between 2003 and 2007. The impacts of the economic downturn, although serious, were somewhat localized to particular sectors and industries such as construction, manufacturing, and retail/wholesale trade. Fortunately for Cupertino, high-tech employment did not decline at the same rate as the rest of the economy, and long-term prospects for this sector remain strong. Unemployment According to unemployment data provided by the State of California Employment Development Department, as of February 2014, the City of Cupertino had an unemployment rate of approximately 3.9 percent. The unemployment rate for the City was less than that of the County as a whole (6.1 percent). Since 2008, the unemployment rate has remained stable in both the City and the County, which had unemployment rates of 3.8 percent and 6.0 percent, respectively, at that time. Long-term Projections Table 2.6 presents population, household, and job growth projections for Cupertino, Santa Clara County, and the nine-county Bay Area region between 2010 and 2040. The figures represent the analysis conducted by the Association of Bay Area Governments (ABAG) using 2010 Census data and a variety of local sources. 513 B-21 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT TABLE 2.5: JOBS BY SECTOR, 2000-2011 Industry Sector Cupertino Santa Clara County 2000 2011 2000 2011 Jobs% TotalJobs% Total% Change Jobs% TotalJobs% Total% Change Agriculture, forestry, fishing and hunting, and mining 760.3%360.1%-52.6%4,3640.5%4,4250.5%1.4% Construction6422.7%4201.7%-34.6%42,2325.0%47,0055.5%11.3% Manufacturing7,95233.2%7,07728.1%-11.0%231,78427.5%167,03419.6%-27.9% Wholesale trade6282.6%5452.2%-13.2%25,5153.0%20,2522.4%-20.6% Retail trade2,0568.6%1,5406.1%-25.1%83,3699.9%81,9189.6%-1.7% Transportation and warehousing, and utilities 3831.6%4251.7%11.0%23,5462.8%23,5782.8%0.1% Information1,4626.1%1,3705.4%-6.3%39,0984.6%32,6273.8%-16.6% Finance, insurance, real estate, and rental and leasing 1,2465.2%1,3685.4%9.8%38,7154.6%44,0155.2%13.7% Professional, scientific, management, administrative, and waste management services 4,66719.5%6,41525.5%37.5%131,01515.5%152,96018.0%16.7% Educational, health, and social services 3,06312.8%4,20716.7%37.3%123,89014.7%157,34918.5%27.0% Arts, entertainment, recreation, accommodation, and food services 8323.5%7342.9%-11.8%49,1865.8%60,6387.1%23.3% Other services (except public administration)5902.5%7152.8%21.2%29,9873.6%36,3304.3%21.2% Public administration 3621.5%3511.4%-3.0%21,2112.5%22,4212.6%5.7% Total 23,959100.0%25,203100.0%5.2%843,912100.0%850,552100.0%0.8% Source: Association of Bay Area Governments (ABAG), Housing Element Data Profiles, December 2013. 514 B-22 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Cupertino’s population is expected to grow by 12,898 residents—from 58,302 in 2010 to 71,200 in 2040. This translates into an increase of 22 percent over 30 years. ABAG projects both Santa Clara County and the ABAG region to experience much larger growth (36 percent and 31 percent over 30 years, respectively). Specifically, communities with lower housing costs have been experiencing influxes of residents in search of comparative affordable housing. As a community with high costs of housing, Cupertino has not experienced an influx of residents. Instead, Cupertino’s job growth is expected to continue to outpace population and household growth in Cupertino between 2010 and 2020, compounding the “jobs rich” nature of the City, resulting in a jobs-to-housing ratio of 1.40 by 2020 (up from 1.29 in 2010) but mirroring the regional average of 1.40. Furthermore, job growth is projected to level off after 2020 to a comparable pace with population and household growth. Similar trends are also projected for the County and the ABAG region as a whole. TABLE 2.6: POPULATION, HOUSEHOLD, AND JOB PROJECTIONS, 2010-2040 20102020203020402010-20202020-20302030-2040 City of Cupertino Population58,30262,10066,30071,2006.5%6.8%7.4% Households20,18121,46022,75024,0406.3%6.0%5.7% Jobs 26,09029,96031,22033,11014.8%4.2%6.1% Santa Clara County Population1,781,6421,977,9002,188,5002,423,50011.0%10.6%10.7% Households604,204675,670747,070818,40011.8%10.6%9.5% Jobs 926,2701,091,2701,147,0201,229,52017.8%5.1%7.2% Bay Area (a) Population6,432,2887,011,7007,660,7008,394,7009.0%9.3%9.6% Households2,350,1862,560,4802,776,6402,992,9908.9%8.4%7.8% Jobs 3,040,1103,579,6003,775,0804,060,16017.7%5.5%7.6% Notes: (a) Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, and Sonoma Counties. Source: Association of Bay Area Governments (ABAG), Housing Element Data Profiles, December 2013. 515 B-23 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT 2.4 Housing Stock Characteristics Housing Stock Conditions The age of the housing stock in Cupertino is similar to that of Santa Clara County. As shown in Table 2.7, the largest proportion of homes in the city (26.7 percent) was built between 1960 and 1969. In both Cupertino and Santa Clara County, 1972 is the median year housing structures were built. Typically, unless carefully maintained, older housing can create health, safety, and welfare problems for its occupants. Even with normal maintenance, dwellings over 40 years of age can deteriorate and require significant rehabilitation. However, while Cupertino’s housing stock is older, most homes remain in relatively good condition, a testament to the relative wealth of the community and pride of home ownership. Data on the number of units which lack complete plumbing and kitchen facilities are often used to assess the condition of a jurisdiction’s housing stock. As Table 2.8 indicates, virtually all housing units contain complete plumbing and kitchen facilities. The 2007-2011 ACS indicates that less than one percent of the units lack these facilities. To characterize the physical conditions of Cupertino’s stock of older residential structures, a windshield survey was performed in 2009-2010 (inspecting exterior building components visible from the public right-of-way only). The windshield survey was conducted for the Rancho Rinconada residential neighborhood in the eastern part of Cupertino. This neighborhood, which is bordered by Lawrence Expressway, Bollinger Road, Miller Avenue, and Stevens Creek Boulevard, is one of the city’s older neighborhoods, with many small, single-story homes built in the 1950s. The windshield survey reported on the exterior condition of the housing units in this neighborhood, including a 516 B-24 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT review of each unit’s foundation, roofing, siding and/or stucco, and windows. The survey concluded that over half of the several dozen homes surveyed had shingles missing from the roof, while nearly all had siding or stucco that needed to be patched and repainted. Many of the homes surveyed were characterized by a lack of maintenance, with overgrown yards or garbage and debris on the property. No significant changes in the market conditions have occurred since the survey in 2009-2010 to have impacted the housing conditions in this neighborhood. The City offers rehabilitation assistance to lower and moderate income households to make necessary repairs and improvements. The City also operates a Code Enforcement program that is primarily complaint/response driven. Between 2009 and 2014, Code Enforcement staff investigated over 1,200 code violations. During investigation of complaints, Code Enforcement officers assess the primary complaint as well as other visible code violations. Based on recent statistics on code enforcement activities, typical code violations in the City include dilapidated structures, trash and debris, hazardous vegetation, and exterior storage. Most violations are able to be resolved within a relatively short timeframe. Depending on the type of code violations, Code Enforcement officers would refer homeowners to the City’s rehabilitation programs for assistance. Households are not displaced due to code enforcement activities unless there is a critical health and safety issue present. Since 2007, an estimated three residential units have been deemed unsafe due to health and safety issues. 517 B-25 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Distribution of Units by Structure Type As shown in Table 2.9, a majority of housing units in Cupertino are single-family detached homes. As of 2013, 57.3 percent of total units in the City of Cupertino were single-family detached dwelling units (a decrease from the 61 percent recorded in 2000). As of 2013, the proportion of single-family homes in the City of Cupertino is still greater than Santa Clara County as a whole (54.1 percent) and the Bay Area as a whole at 53.6 percent. Large multi-family buildings (defined as units in structures containing five or more dwellings) represent the second largest housing category at 21.0 percent of the total number of units in Cupertino as of 2013. As of 2013, multi-family housing (5+ units) represented 25.5 percent of housing units in Santa Clara County and 25.1 percent in the Bay Area as a whole. TABLE 2.7: HOUSING STRUCTURES YEAR BUILT, CUPERTINO, 2011 Year Built Cupertino Santa Clara County Number PercentageNumberPercentage Built 2000 to Later 1,638 7.8%59,880 9.5% Built 1990 to 1999 2,520 12.0%63,429 10.1% Built 1980 to 1989 2,920 13.9%79,409 12.6% Built 1970 to 1979 4,374 20.8%143,847 22.9% Built 1960 to 1969 5,619 26.7%121,349 19.3% Built 1950 to 1959 3,216 15.3%100,795 16.0% Built 1940 to 1949 539 2.6%27,495 4.4% Built 1939 or earlier 232 1.1%33,244 5.3% Total 21,058 100.0%629,448 100.0% Median Year Built 1972 1972 Source: Association of Bay Area Governments (ABAG), Housing Element Data Profiles, December 2013. 518 B-26 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Single-family attached homes comprised the third largest housing category in Cupertino, at 12.2 percent in 2013. By comparison, these homes made up 9.7 percent of the housing stock in all of Santa Clara County and 9.2 percent in the Bay Area as a whole. As of 2013, small multi-family homes (defined as units in structures containing 2 to 4 dwellings) represented 9.5 percent in the City of Cupertino, 7.7 percent in Santa Clara County and 9.9 percent in the Bay Area as a whole. TABLE 2.8: HOUSING CONDITIONS, CUPERTINO, 2011 Number Percent of Total Plumbing Facilities Owners Complete Plumbing Facilities 12,900 63.9% Lacking Complete Plumbing Facilities 61 0.3% Renters Complete Plumbing Facilities 7,215 35.8% Lacking Complete Plumbing Facilities 0 0.0% Total 20,176 100.0% Kitchen Facilities Owners Complete Kitchen Facilities 12,923 64.1% Lacking Complete Kitchen Facilities 38 0.2% Renters Complete Kitchen Facilities 7,132 35.3% Lacking Complete Kitchen Facilities 83 0.4% Total 20,176 100.0% Source: Association of Bay Area Governments (ABAG), Housing Element Data Profiles, December 2013. 519 B-27 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT TABLE 2.9: HOUSING UNITS BY TYPE, 2000-2013 2000 2013 Number of Units Percent of Total Number of Units Percent of Total Percent Change City of Cupertino Single Family Detached 11,42561.1%12,05657.3%5.5% Single Family Attached 2,02810.8%2,56112.2%26.3% Multi-family 2-4 units 1,6638.9%2,0029.5%20.4% Multi-family 5+ units 3,57619.1%4,42221.0%23.7% Mobile Homes 9 0.0%0 0.0%-100.0% Total 18,701100.0%21,041100.0%12.5% Santa Clara County Single Family Detached 323,91355.9%346,14554.1%6.9% Single Family Attached 52,7399.1%62,2019.7%17.9% Multi-family 2-4 units 46,3718.0%48,9237.7%5.5% Multi-family 5+ units 136,62823.6%163,12425.5%19.4% Mobile Homes 19,6783.4%19,0533.0%-3.2% Total 579,329100.0%639,446100.0%10.4% Bay Area Single Family Detached 1,376,86153.9%1,505,15353.6%9.3% Single Family Attached 224,8248.8%258,6339.2%15.0% Multi-family 2-4 units 266,32010.4%278,4509.9%4.6% Multi-family 5+ units 623,38824.4%705,89925.1%13.2% Mobile Homes 61,0112.4%59,6732.1%-2.2% Total 2,552,404100.0%2,807,808100.0%10.0% Source: Association of Bay Area Governments (ABAG), Housing Element Data Profiles, December 2013. 520 B-28 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Overcrowding Overcrowding refers to a household with an average of more than one person per room (including bedrooms and dining rooms but not kitchens or bathrooms). Units with more than 1.5 persons per room are considered to be severely overcrowded. As shown in Table 2.10, as of 2011 the total percentage of overcrowding by tenure represented 5.2 percent for Cupertino households, which is slightly lower compared to 7.2 percent in Santa Clara County. Overcrowding was much more common in Cupertino’s renter-occupied households, with 10.7 percent of these households considered to be overcrowded. By comparison, only 2.2 percent of owner-occupied households in the city were overcrowded. In Santa Clara County, 3.4 percent of owner-occupied households experienced overcrowding versus 12.5 percent of renter-households. Overcrowding conditions in Cupertino approximate regional averages, with a slightly higher level of overcrowding among renter- households than in the region. 2.5 Market Conditions & Income Related to Housing Costs This section of the Needs Assessment provides information on market conditions for housing in Cupertino. This information is important because it reveals the extent to which the private housing market is providing for the needs of various economic segments of the local population. Available data on housing market conditions are combined with information on the demographics of the local population to identify those segments of the population that may face difficulties in securing affordable housing in Cupertino. 521 B-29 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT TABLE 2.10: OVERCROWDED HOUSEHOLDS, 2011 (A)(B) Owners Renters Total Overcrowded HouseholdsPercentHouseholdsPercentHouseholdsPercent Cupertino 1.51 or more persons per room (Severely Overcrowded)390.3%731.0%112 0.6% 1.01 to 1.50 (Overcrowded)2461.9%7009.7%946 4.7% 1.00 or Less 12,67697.8%6,44289.3%19,11894.8% Total 12,961100.0%7,215100.0%20,176100.0% % Overcrowded by Tenure 2.2%10.7%5.2% Santa Clara County 1.51 or more persons per room (Severely Overcrowded)2,7550.8%11,7994.8%14,5542.4% 1.01 to 1.50 (Overcrowded)9,1362.6%19,2137.8%28,3494.7% 1.00 or Less 340,00696.6%216,74387.5%556,74992.8% Total 351,897100.0%247,755100.0%599,652100.0% % Overcrowded by Tenure 3.4%12.5%7.2% ABAG Region 1.51 or more persons per room (Severely Overcrowded)9,6200.7%40,1613.6%49,7811.9% 1.01 to 1.50 (Overcrowded)32,6322.2%63,1885.7%95,8203.7% 1.00 or Less 1,434,77997.1%997,10090.6%2,431,87994.4% Total 1,477,031100.0%1,100,449100.0%2,577,480100.0% % Overcrowded by Tenure 2.9%9.4%5.6% Notes: (a) State HCD defines an overcrowded unit as one occupied by 1.01 persons or more (excluding bathrooms and kitchen). Units with more than 1.5 persons per room are considered severely overcrowded. (b) The 2010 Census does not contain detailed data on household conditions. Overcrowding data in this table are based on the American Community Survey (ACS), which is comprised of a series of small surveys for jurisdictions taken at different intervals based on population size. The 2000 Census overcrowding data were developed based on the 100 percent survey. Therefore, the significant changes between the 2000 Census and ACS may due in part to actual changes in overcrowding conditions, and in part to different survey methodologies. Sources: U.S. Census, American Community Survey (ACS), 2007-2011. 522 B-30 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Rental Market Characteristics and Trends A review of rental market conditions in Cupertino was conducted for this Housing Element by reviewing advertised apartment listings. As shown in Table 2.11, a total of 170 units were listed, the majority of which were one- and two-bedroom units. The survey found that market- rate rents averaged: ƒƒ $1,608 per month for studio units ƒƒ $2,237 per month for one-bedroom units ƒƒ $2,886 per month for two-bedroom units ƒƒ $3,652 per month for three-bedroom units Rental prices in Cupertino ranged from $1,400 for a studio unit to $5,895 for a five-bedroom unit. As can be expected, smaller units are more affordable than larger units. The overall median rental price for all unit sizes was $2,830, and the average price was $2,919. TABLE 2.11: OVERVIEW OF RENTAL HOUSING MARKET, CUPERTINO, 2014 (a) Size Number Advertised Median RentAverage RentRent Range Studio 5 $1,559 $1,608 $1,400-$1,800 One-Bedroom 44 $2,274 $2,237 $1,845-$2,567 Two-Bedroom 80 $2,844 $2,886 $1,950-$3,820 Three-Bedroom 33 $3,500 $3,652 $2,600-$4,595 Four-Bedroom 6 $4,999 $4,683 $3,700-$5,300 Five-Bedroom 2 $5,198 $5,198 $4,500-$5,895 Total 170 $2,830 $2,919 $1,400-$5,895 Note: (a) Search performed on Craigslist.org and Zillow.com of listings dated February 12 to March 7, 2014. Sources: Craigslist.org, 2014; Zillow.com, 2014. 523 B-31 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT While home prices in the city steadily increased, the number of homes being sold declined slightly between 2012 and 2013, from 530 units to 512 units (Figure A-B). Neighboring jurisdictions also experienced similar declines in sales volume, with the largest decrease occurring in Home Sale Trends While other areas of the state and nation have experienced downturns in the housing market recently, Cupertino home values have continued to grow. During the depth of the housing market crash (between 2008 and 2010), median home price in Cupertino held steady at around $1,000,000. Since 2011, home prices in Cupertino have increased substantially. According to DQNews, the median sales price for single-family residences and condos increased by 28.6 percent from $933,000 in 2011 to $1,200,000 in 2013. As shown in Table 2.12, this increase was one of the highest in the region. Median home prices in Santa Clara County as a whole increased even more dramatically (by 36.5 percent) during the same time period. Figure B-1 shows that the City of Cupertino had the second highest median home sales price in the region during 2013 at $1,200,000, behind only the City of Saratoga at $1,600,000. The 2013 median home sales price of $1,200,000 in Cupertino was also nearly double that of the County median price ($645,000). Most recent sales data reported by DQNews.com compare sales records in the month of March 2014 with those in March 2013. Prices in Santa Clara County experienced a 15 percent increase over that one-year period, while Milpitas and Cupertino registered the largest increases in the County at 36 percent and 31 percent, respectively. Throughout 2014, Cupertino’s median home sale price has continued on this upward trend—as of June 2014, the median single-family home price in Cupertino was $1,550,000 and a townhome/condominium was selling for $822,500. 524 B-32 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Figure B-1 Annual Median Home Sale Price, 2013 $701,000 $1,200,000 $800,000 $635,000 $1,600,000 $767,500 $0 $200,000 $400,000 $600,000 $800,000 $1,000,000 $1,200,000 $1,400,000 $1,600,000 CampbellCupertinoMountain View Santa Clara SaratogaSunnyvale Santa Clara County: $645,000 TABLE 2.12: ANNUAL MEDIAN HOME SALE PRICES, 2011-2013 Jurisdiction2011 2012 2013 % Change 2011-2012 % Change 2012-2013 % Change 2011-2013 Campbell$569,000 $625,000 $701,000 9.8%12.2%23.2% Cupertino$933,000 $1,045,750 $1,200,000 12.1%14.8%28.6% Mountain View $678,500 $769,250 $800,000 13.4%4.0%17.9% Santa Clara$500,000 $540,000 $635,000 8.0%17.6%27.0% Saratoga$1,377,500 $1,527,500 $1,600,000 10.9%4.7%16.2% Sunnyvale$570,000 $645,000 $767,500 13.2%19.0%34.6% Santa Clara County $472,500 $525,000 $645,000 11.1%22.9%36.5% Source: DQNews.com, 2014. 525 B-33 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Figure B-1 Annual Median Home Sale Price, 2013 $701,000 $1,200,000 $800,000 $635,000 $1,600,000 $767,500 $0 $200,000 $400,000 $600,000 $800,000 $1,000,000 $1,200,000 $1,400,000 $1,600,000 CampbellCupertinoMountain View Santa ClaraSaratogaSunnyvale Santa Clara County: $645,000 Mountain View. Overall, the number of units sold in the County decreased slightly from 20,940 units in 2012 to 20,700 units in 2013, according to DQNews.com. Vacancy Rates and Trends The 2010 Census data as reported in ABAG’s Housing Element Data Profiles indicate an overall vacancy rate of 4.0 percent in the City, which was slightly lower than the Santa Clara County vacancy rate of 4.4 percent (see Table 2.13). Specifically, Cupertino’s rental vacancy rate was reported at 4.7 percent, compared to a vacancy rate of less than one percent (0.8 percent) for ownership housing. While the rental vacancy rate increased notably from the 1.8 percent reported by the 2000 Census, the homeowner vacancy rate stayed essentially the same. Despite the increase, the local vacancy rates were still below optimum. Typically, industry standards consider a rental vacancy rate of five to six percent and a vacancy rate for ownership housing of one to two percent to be adequate to facilitate mobility. Housing Affordability According to the federal government, housing is considered “affordable” if it costs no more than 30 percent of a household’s gross income. Often, affordable housing is discussed in the context of affordability to households with different income levels. Households are categorized as extremely low income, very low income, low income, median income, moderate income, or above moderate income based on percentages of the AMI established annually by the California Department of Housing and Community Development. Income limits also vary by household size. Table 2.14 provides the maximum income limits for a four-person household in Santa Clara County in 2014. Extremely low-, very low- and low-income households are eligible for federal, state, and local affordable housing programs. Moderate-income households are eligible for 526 B-34 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT some state and local housing programs. These income categories are also used by ABAG in the Regional Housing Needs Allocation, or RHNA, process. In Cupertino, the Below Market Rate (BMR) Ordinance establishes an additional income range: median income (81 -100 percent of AMI). Another way to think of the household income categories is to consider what types of jobs people in these different categories might have. Figure B-3 provides representative households in Santa Clara County, along with hypothetical jobs and family compositions. Ability to Purchase/Rent Homes by Household Income Table 2.15 shows affordability scenarios by income and household size for Santa Clara County. The following analysis compares the maximum affordable housing costs Campbell Cupertino Mountain View Santa Clara Saratoga Sunnyvale 2012 555 530 849 1,176 480 1,208 2013 554 512 759 1,214 448 1,326 0 100 200 300 400 500 600 700 800 900 1,000 1,100 1,200 1,300 1,400 Figure B-2 Home Sales Volume, 2012 - 2013 0 500 1,000 1,500 2012 555 530 849 1,176 480 1,208 2013 554 512 759 1,214 448 1,326 Campbell Cupertino Mountain View Santa Clara Saratoga Sunnyvale 527 B-35 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT CampbellCupertinoMountain ViewSanta ClaraSaratogaSunnyvale 20125555308491,1764801,208 20135545127591,2144481,326 0 100 200 300 400 500 600 700 800 900 1,000 1,100 1,200 1,300 1,400 TABLE 2.13: HOUSING OCCUPANCY AND VACANCY STATUS, 2010 Cupertino Santa Clara County California Occupancy Status NumberPercentNumberPercentNumberPercent Occupied Housing Units 20,18196.0%604,20495.6%12,577,49891.9% Vacant 846 4.0%27,7164.4%1,102,5838.1% For Rent 373 1.8%11,5191.8%374,6102.7% For Sale Only108 0.5%5,0670.8%154,7751.1% Rented Or Sold, Not Occupied 76 0.4%2,2220.4%54,6350.4% For Seasonal, Recreational, or Occasional Use 125 0.6%3,0000.5%302,8152.2% For Migrant Workers 3 0.0%50 0.0%2,1000.0% Other Vacant (a)161 0.8%5,8580.9%213,6481.6% Total 21,027100.0%631,920100.0%13,680,081100.0% Homeowner Vacancy Rate 0.8%1.4%2.1% Rental Vacancy Rate 4.7%4.3%6.3% Notes: (a) If a vacant unit does not fall into any of the classifications specified above, it is classified as “other vacant.”For example, this category includes units held for occupancy by a caretaker or janitor, and units held by the owner for personal reasons. Source: Association of Bay Area Governments (ABAG), Housing Element Data Profiles, December 2013. 528 B-36 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT for various households to the rental survey and median home sales price data for Cupertino shown earlier. The maximum affordable sales price was calculated using household income limits published by the California Department of Housing and Community Development, conventional financing terms, and assuming that households spend 30-35 percent of gross income on mortgage payments, taxes, and insurance. When comparing the home prices and rents shown earlier in Table 2.11 and Table 2.12 with the maximum affordable housing costs presented in Table 2.15, it is evident that extremely low- and very low-income households in Cupertino have no affordable housing options. For example, a four-person very low income household could afford $1,084 a month for rent, but the average rent for a two-bedroom unit was $2,886, more than double what this household could afford. Even for low- and moderate- income households, adequately sized and affordable rental housing options are very limited. A four-person moderate income household could afford $2,928 monthly for rent, barely above the average rent of a two-bedroom unit. Homeownership is generally beyond the reach of most lower- and moderate-income households. TABLE 2.14: HOUSEHOLD INCOME LIMITS, SANTA CLARA COUNTY, 2014 Income Category % Of Area Median IncomeTop of Income Range (a) Extremely Low Income 0% to 30%$31,850 Very Low Income 31% to 50%$53,050 Low Income 51% to 80%$84,900 Moderate Income 81% to 120%$126,600 Santa Clara Median Income 100%$105,500 Notes: (a) Based on HCD 2014 Household Income Limits for households of four persons in Santa Clara County. Source: California Department of Housing and Community Development, 2014. 529 B-37 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT As shown in Table 2.15, a four-person moderate income household could afford a home of approximately $625,800, just about half the price of a median-priced home in Cupertino. To augment this analysis, the household incomes of select occupations were analyzed to evaluate these workers’ ability to rent or purchase homes in Cupertino. Figure B-4 shows the average annual wages for a range of occupations in Santa Clara County, based on 2013 State Employment Development Department occupational employment and wage data. In general, low-paying occupations in the health care support and food preparation industries do not pay salaries high enough to allow their workers to afford housing in Cupertino. In addition, while those employed in higher-paying occupations may earn more, they may still have difficulty purchasing an adequately sized home. Figure B-3 Representative Households, Santa Clara County, 2014 Moderate Income Household (80% – 120% AMI) Estimated Annual Income: $84,900 - $126,000 Dad works as a paralegal, mom works as a home health aide; they have two children. Low Income Household (50% – 80% AMI) Estimated Annual Income: $53,050 - $84,900 Dad works as a security guard, mom works as a teaching assistant; they have two children. Very Low Income Household (Up to 50% AMI) Estimated Annual Income: Up to $42,050 Mom works as a file clerk and is the only source of financial support in her family; she has one child. Sources: California Employment and Development Department, 2014; and California Department of Housing and Community Development, 2014. 530 B-38 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT TABLE 2.15: MAXIMUM AFFORDABLE HOUSING COSTS, SANTA CLARA COUNTY, 2013 (a, b, c) Annual Income Limits Affordable Housing CostUtilities, Taxes, Insurance, HOA DuesAffordable Price RentOwnership Utilities Renter Utilities Ownership Taxes/ Insurance RentSale Extremely Low Income (0-30% AMI) 1-Person $22,300$558$558$137$149$195$421 $41,840 2-Person $25,500$638$638$160$173$223$478$47,330 3-Person $28,650$716$716$182$198$251$534$52,465 4 Person $31,850$796$796$242$265$279$554$49,524 5 Person $34,400$860$860$290$316$301$570$47,649 Very Low Income (31-50% AMI) 1-Person $37,150$929$929$137$149$325$792$89,158 2-Person $42,450$1,061$1,061$160$173$371$901$101,340 3-Person $47,750$1,194$1,194$182$198$418$1,012$113,325 4 Person $53,050$1,326$1,326$242$265$464$1,084$117,076 5 Person $57,300$1,433$1,433$290$316$5011,143$120,617 Low Income (51-80% AMI) 1-Person $59,400$1,108$1,292$137$149$452$973$135,504 2-Person $67,900$1,266$1,477$160$173$517$1,106$154,329 3-Person $76,400$1,424$1,662$182$198$582$1,242$172,959 4 Person $84,900$1,583$1,846$242$265$646$1,341$183,353 5 Person $91,650$1,709$1,994$290$316$698$1,419$192,177 Median Income (81-100% AMI) 1-Person $73,850$1,662$1,939$137$149$678$1,525$217,864 2-Person $84,400$1,899$2,216$160$173$775$1,739$248,456 3-Person $94,950$2,136$2,492$182$198$872$1,954$278,851 4 Person $105,500$2,374$2,769$242$265$969$2,132$301,010 5 Person $113,950$2,564$2,991$290$316$1,047$2,274$319,248 Moderate Income (101-120% AMI) 1-Person $88,600$2,031$2,369$137$149$829 $1,894 $272,771 2-Person $101,300$2,321$2,708$160$173$948$2,161$311,206 3-Person $113,950$2,611$3,046$182$198$1,066$2,429$349,445 4 Person $126,600$2,901$3,385$242$265$1,185$2,659$379,449 5 Person $136,750$3,133$3,656$290$316$1,279$2,843$403,961 Notes: (a) This table is intended for general information purposes only. Any proposed BMR unit initial sales prices shall be determined by the City based on Health and Safety Code requirements and available interest rates/conditions at the time of sale. (b) Assumptions for rental scenarios: 2014 HCD income limits; affordable housing costs pursuant to California Health & Safety Code Section 50053(b)(1)(2)(3)(4); utilities based on Housing Authority of Santa Clara 2013 County Utility Allowance (c) Assumptions for ownership scenarios: 2014 HCD income limits; affordable housing costs pursuant to California Health & Safety Code Section 50052.5(b)(1)(2)(3)(4); 35% of monthly affordable cost for taxes, insurance, monthly mortgage insurance and HOA dues; 5% downpayment, 5% interest rate; conventional 30 year fixed rate mortgage loan; utilities based on Housing Authority of Santa Clara 2013 County Utility Allowance.Sources: California Department of Housing and Community Development, 2014; California Health & Safety Code, 2014; Housing Authority of the County of Santa Clara, 2013; Veronica Tam and Associates, 2014. 531 B-39 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Overpayment (Cost Burden) According to Department of Housing and Urban Development (HUD) standards, a household is considered to be “cost-burdened” (i.e. overpaying for housing) if it spends more than 30 percent of gross income on housing- related costs. Households are “severely cost burdened” if they pay more than 50 percent of their income on housing cost. According to special data developed by the ACS for HUD, approximately 30 percent of renters and 37 percent of homeowners in Cupertino were overpaying for housing in 2010. By contrast, overpayment was much more common in Santa Clara County as a whole, with 42 percent of renters and 39 percent of homeowners classified as cost-burdened in 2010. Housing cost burden was particularly pronounced for extremely low- and very low-income households in Cupertino. In 2010, 51 percent of Cupertino’s extremely low-income renters and 37 percent of its very low-income renters were severely cost burdened. This finding is consistent with the analysis of the local housing market, which revealed a significant gap between home prices and rents and the income of lower income households. Figure B-4 Income Needed to Afford Housing Compared with Income $152,925 $106,995 $59,719 $55,000 $54,296 $36,000 $23,795 $0 $50,000 $100,000 $150,000 $200,000 $250,000 $300,000 ManagementEngineeringEducationProtective Services SalesHealthcare Support Food Prep Income Needed to Rent an Apt. ($135,840) Income Needed to Buy a Home ($299,555) 532 B-40 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT TABLE 2.16: HOUSING COST BURDEN BY TENURE AND HOUSEHOLD TYPE, CUPERTINO, 2010 (A) Household by Type, Income, and Housing Problem Renters Owners Total HouseholdsSeniorsSmall Families Large Families TotalSeniors Large Families Total Extremely Low (0-30%)30031010820370106651,485 With any housing problem 61.7%69.4%100.0%64.6%55.4%100.0%61.7%63.3% With cost burden >30%61.7%69.4%100.0%64.6%55.4%100.0%61.7%63.3% With cost burden >50%45.0%62.9%100.0%56.1%27.0%100.0%44.4%50.8% Very Low (31-50%)7530025485555408351,320 With any housing problem 100.0%70.0%100.0%81.4%35.1%100.0%44.9%58.3% With cost burden >30%100.0%70.0%40.0%79.4%36.0%100.0%45.5%58.0% With cost burden >50%60.0%30.0%40.0%43.3%27.9%100.0%32.9%36.7% Low (51-80%)5515055450500308101,260 With any housing problem 100.0%76.7%100.0%76.7%31.0%0.0%45.7%56.7% With cost burden >30%100.0%66.7%90.9%72.2%31.0%0.0%42.6%53.2% With cost burden >50%100.0%43.3%72.7%46.7%21.0%0.0%30.2%36.1% Moderate/Above Moderate (>80%)2653,5153855,1701,9901,02510,34515,515 With any housing problem 47.2%24.9%66.2%28.7%22.9%40.0%35.5%33.3% With cost burden >30%47.2%12.8%0.0%15.6%21.4%33.2%33.7%27.7% With cost burden >50%11.3%0.0%0.0%0.6%7.0%2.4%7.5%5.2% Total Households6954,2754756,9253,4151,10512,65519,580 With any housing problem 63.3%33.1%72.6%39.8%29.6%41.6%38.2%38.7% With cost burden >30%63.3%22.8%14.7%29.5%28.8%35.3%36.5%34.0% With cost burden >50%38.1%8.2%12.6%13.1%14.6%6.8%12.6%12.8% Notes: (a) Data presented in this table are based on special tabulations from 2006-2010 American Community Survey (ACS) data. Due to the small sample size, the margins for error can be significant. Interpretations of these data should focus on the proportion of households in need of assistance rather than on precise numbers. Source: HUD Comprehensive Housing Affordability Strategy (CHAS), based on the 2006-2010 ACS. 533 B-41 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT 2.6. Assisted Housing at Risk of Conversion State law requires local housing elements to include an inventory of affordable housing developments that could be at risk of conversion to market rates during the 10-year period that follows the adoption of the element. For those units found to be at risk of conversion, the element must estimate the cost to preserve or replace the at-risk units, to identify the resources available to help in the preservation or replacement of those units, and to identify those organizations that could assist in these efforts. Inventory of Existing Affordable Units Table 2.17 presents the inventory of affordable housing units in Cupertino and indicates the earliest dates of termination of affordability restrictions for each project. In 2011, the 10 below market rate (BMR) units in the Chateau Cupertino development expired. However, the City is committed to maintaining the long-term affordability of current BMR units. As such, in 2005 the City increased the minimum affordability term for BMR units in new developments to 99 years. Since 2010, 17 new units at the Markham Apartments have been added to the BMR inventory. Units at Risk of Conversion During Next Ten Years The affordable housing developments at risk of conversion to market rate during the next 10 years include those units whose affordability restrictions are set to expire January 31, 2025 or earlier. As presented in Table 2.17, the affordability restrictions for the eight-unit Beardon Drive project will expire in December 2024. In addition, certain affordability restrictions for Le Beaulieu Apartments are also set to expire during the next 10 years. Cupertino Community Housing originally developed Le Beaulieu in 1984 and utilized HUD project-based Section 8 assistance. Mid-Peninsula Housing Coalition, a nonprofit organization, acquired and rehabilitated the project in 534 B-42 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT TABLE 2.17: INVENTORY OF AFFORDABLE HOUSING UNITS Number of Affordable Units Household Income Funding Source Earliest Termination DateVery Low or Low Moderate Affordable Developments Sunny View West 22449 Cupertino Rd. 100 100 0 HUD 202/811 3/31/2031 Stevens Creek Village 19140 Stevens Creek Blvd. 40 40 0 CHFA, HUD & HOME 6/30/2035 Le Beaulieu Apartments 10092 Bianchi Way 27 27 0CalFHA/CDBG 2035 9/12/2015 WVCS Transitional Housing 10311-10321 Greenwood Ct. 4 4 0 CDBG7/14/2026 Beardon Drive 10192-10194 Beardon Dr. 8 8 0 CDBG12/21/2024 Senior Housing Solutions 19935 Price Avenue 1 1 0 CDBG6/242066 Maitri Transitional Housing Undisclosed Location 4 4 0 CDBG3/16/2064 Total 184 184 0 1998. Le Beaulieu contains 27 one- and two-bedroom units for adults with physical disabilities who are able to live independently. All units are handicap accessible and affordable to very low-income households (less than 50 percent of AMI). The Le Beaulieu development is not considered to be at risk of converting to market rate because there are other funding sources tied to the property such as the City’s CDBG (30-year agreement) and CalHFA loan agreement. 535 B-43 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT TABLE 2.17: INVENTORY OF AFFORDABLE HOUSING UNITS Number of Affordable Units Household Income Funding Source Earliest Termination DateVery Low or Low Moderate Affordable Developments Biltmore Apartments 10159 South Blaney Ave. 2 2 0 BMR6/30/2029 Park Center Apartments 20380 Stevens Creek Blvd. 4 4 0 BMR 7/8/2026 The Hamptons 19500 Pruneridge Ave. 34 34 0 BMR10/20/2027 Arioso Apartments 19608 Pruneridge Ave. 20 20 0 BMR1/29/2028 Forge-Homestead Apartments 20691 Forge Way 15 15 0 BMR1/16/2027 Aviare Apartments 20415 Via Paviso 20 20 0 BMR 7/8/2026 The Markham Apartments 20800 Homestead Road 17 17 0 BMR 2039 Lake Biltmore 19500 Pruneridge Ave. 2 2 0 BMR 2029 Vista Village 101144 Vista Drive 24 24 0 BMR11/29/2056 Total 138 138 0 Below Market Rate (BMR) For-Sale Units Total (a)122 0 122 BMR Notes: (a) Property addresses of BMR units are not listed in order to protect the privacy of homeowners. Source: City of Cupertino, 2014. 536 B-44 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT In addition, Mid-Peninsula Housing Coalition is committed to maintaining the property as affordable. Discussions with Mid-Peninsula Housing Coalition staff in early 2014 confirmed the organization is in the process of applying for a 20-year extension of the Section 8 contract. Renewal of Section 8 funding for senior and disabled housing has been prioritized by HUD and Mid-Peninsula Housing fully expects to be able to extend the Section 8 assistance. Furthermore, other affordability covenants on the project would require the project to remain as affordable housing well beyond this Housing Element planning period. One property has been identified with expiring affordability restriction during this planning period – the Beardon Drive development. In 1994, Community Housing Developers Inc., a nonprofit housing provider, received a loan from the City’s CDBG program for the acquisition of the Beardon Drive property. The loan agreement restricts the eight units for very low-income use for 30 years. As such, income restriction for this project would expire in 2024. As Beardon Drive is owned by a nonprofit housing provider, it is considered to be at low risk of converting to market-rate housing. Nevertheless, for the purpose of this Housing Element, options and costs to preserve these units are discussed below. Preservation and Replacement Options Typically, transferring the at-risk projects to nonprofit ownership would ensure the long-term affordability of the units. However, the Beardon Drive project is already owned by a nonprofit organization. Beardon Drive does not rely on ongoing rent subsidies (such as Section 8) to maintain affordable rents. A strategy to preserving this project as affordable housing is to ensure the financial status of the project (i.e., net operating income and reserve) is adequate to maintain the affordable rents. The City has included a strategy in the Housing Plan to provide rehabilitation 537 B-45 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT assistance to affordable housing projects to upkeep the housing quality standards and to reduce ongoing maintenance and operating expenses. The City may also choose to extend the loan repayment schedule in exchange for an extended affordability covenant. Another strategy is to provide ongoing rental subsidies to the project. The estimated total amount needed to subsidize rents for existing tenants is shown in Table 2.18. Given the unit mix of all eight at-risk units, the total cost of subsidizing the rents for these units is estimated at $61,152 annually. For a 10-year affordability covenant, a total subsidy of more than $600,000 would be needed. Construction of Replacement Units In the unlikely event that Community Housing Developers, Inc. chooses to convert Beardon Drive from an affordable housing project to market-rate housing, the construction of new affordable housing units as a means of replacing the currently at-risk units may be an option for Cupertino. The cost of developing housing depends upon a variety of factors including the density and size of the units (i.e. square footage and number of bedrooms), location, land costs, and type of construction. Based on general assumptions for average construction costs, it would cost approximately $940,000 to construct eight affordable replacement units, excluding land costs and other soft costs (such as architecture and engineering). When considering these additional costs, especially given the high cost of land in Cupertino, the total costs to develop replacement units would be significantly higher. Financial Resources Available to the City to Assist in Preservation Clearly, the costs of preserving or replacing affordable 538 B-46 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT housing units are substantial. In light of this challenge, the City must consider what resources are available to help preserve or replace those units so that lower-income tenants are not displaced in the event that affordable units convert to market rate. The City has access to a range of different funds that could potentially assist in a preservation effort, including: ƒƒCity Below Market Rate (BMR) Affordable Housing Fund (AHF) (approximately $6 million unencumbered as of 2014) TABLE 2.19: ESTIMATED NEW CONSTRUCTION COSTS Unit Size (A)(B)(C)(D) Total Units Estimated Average Unit Size (sq. ft.) Estimated Gross Building Size Estimated Gross Building Costs 2 Bedroom 8 807 7,747$941,963 Average Per Unit Cost:$117,745 Notes: (a) (C) = (A) x (B) x 1.20 (i.e. 20% inflation to account for hallways and other common areas). (D) = (C) x $97.27 (per square foot construction costs) x 1.25 (i.e. 25% inflation to account for parking and landscaping costs).Source: Veronica Tam and Associates, 2014 TABLE 2.18: RENTAL SUBSIDIES REQUIRED FOR AT-RISK UNITS Unit Size/ Household Size Number of Units Fair Market Rent (a) Household Annual Income (b) Affordable Housing Cost (c) Monthly per Unit Subsidy (d) Total Monthly Subsidy Very Low Income (50% AMI) 2-Bedroom/3-person household 8$1,649$47,750$1,012$637$5,096.00 Total Annual Subsidy $61,152 Notes: (a) Fair Market Rent (FMR) is determined by HUD. These calculations use the 2014 HUD FMR for Santa Clara County. (b) Rents are restricted to 50% AMI for this development, which puts residents in the Very Low Income Category, set by the California Department of Housing and Community Development (HCD), 2014. (c) The affordable housing cost is calculated based on 30% of the AMI, minus utilities for rentals. (d) The monthly subsidy covers the gap between the FMR and the affordable housing cost Source: Veronica Tam and Associates, 2014. 539 B-47 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT ƒƒCDBG Entitlement Funds (approximately $150,000 unencumbered as of 2014) ƒƒSanta Clara County HOME Consortium Funds Funds (available through a competitive application process after the City joins the Consortium in 2015) ƒƒMortgage Revenue Bonds ƒƒState Grant Programs ƒƒFederal Grant Programs ƒƒLow Income Housing Tax Credits ƒƒHUD Section 8 “Mark to Market” Program Once the City becomes aware of an impending conversion, staff will begin exploring the availability of funding from various sources. In many cases, the City will find it advantageous to collaborate with private affordable housing developers or managers to develop and implement a viable plan to preserve affordable housing units. Private developers can often bring additional expertise and access to funding, such as tax credits. The State Department of Housing and Community Development maintains a list of affordable housing developers and property managers who have expressed an interest in working with local communities to preserve affordable housing projects. This database lists organizations that are interested in working in any county within the State of California, including well-known affordable housing providers such as Mercy Housing, EAH, MidPen Housing, etc. The database also lists numerous organizations that have expressed interest in working on preservation projects in Santa Clara County in particular, including organizations such as BRIDGE Housing Corporation and Eden Housing. The organizations listed above are but a few of those listed in the HCD database that the City of Cupertino could consider as potential 540 B-48 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT partners in the event that it becomes necessary to assemble a team to preserve an affordable housing project. 2.7. Special Housing Needs This section of the needs assessment profiles populations with special housing needs, including seniors, large households, single parent households, persons with disabilities (including persons with developmental disabilities), farm workers, persons living in poverty, and homeless persons. Table 2.20 summarizes the special needs groups in Cupertino Seniors Many senior residents face a unique set of housing needs, largely due to physical limitations, fixed incomes, and health care costs. Affordable housing cost, unit sizes and accessibility to transit, family, health care, and other services are important housing concerns for the seniors. As Table 2.21 shows, in 2010, 19.7 percent of Cupertino householders were 65 years old or older, comparable to the proportion of senior households in Santa Clara County (18.5 percent). A large majority of these senior households owned their homes (80.3 percent). In Cupertino, homeownership is much more common among seniors than for any other age group. Just 58.2 percent of householders under 64 years old owned their homes. 541 B-49 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Comprehensive Housing Affordability Strategy (CHAS) data shown in Table 2.16 indicates that among Cupertino’s senior households, renters were more likely to be lower income than homeowners. Nearly 62 percent of senior renter-households earned less than 80 percent of the median family income compared to only 42 percent of senior homeowners. Seniors across the country are often required to dedicate a larger portion of their income to housing costs. Among all of the renter-households in Cupertino, the proportion of seniors overpaying for housing in 2010 was more than TABLE 2.20: SPECIAL NEEDS GROUPS, 2010-2013 Special Needs Group Persons or Household Renter OwnerPercent of Total Senior-Headed Households 3,983 785 (19.7%)3,198 (80.3%)19.7% Households with a Senior Member 5,069 n/a n/a 25.1% Seniors Living Alone 1,612 516 (32.0%)1,096 (68.0%)8.0% Large Households 1,883 619 (32.9%)1,264 (67.1%)9.3% Single-Parent Households 883 n/a n/a 4.4% Female Single-Parent Households 667 n/a n/a 6.9% Persons with Disabilities (a)3,445 n/a n/a 5.9% Agricultural Workers (b)36 n/a n/a <1% Persons living in Poverty (b)2,330 n/a n/a 4.0% Homeless (c)112 n/a n/a <1% Notes: (a) 2010 Census data not available for persons with disabilities. Estimate is from the 2008-2012 ACS. Estimate is for persons 5 years of age and older. (b) 2010 Census data not available. Estimate is from the 2007-2011 ACS.| (c) 2010 Census data not available. Estimate is from 2013 Santa Clara County Homeless Point-In-Time Census and Survey Comprehensive Report. Of the 112 homeless persons counted in Cupertino in 2013, 92 persons were unsheltered and 20 were sheltered. Sources: Association of Bay Area Governments (ABAG), Housing Element Data Profiles, December 2013; U.S. Census, American Community Survey (ACS), 2008-2012; 2013 Santa Clara County Homeless Point-In-Time Census and Survey Comprehensive Report. 542 B-50 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT double the proportion for the general population: 63 percent versus 30 percent, respectively (see Table 2.16 on page A-40). For homeowners, however, the proportion of senior owner-households overpaying for housing was much more on par with the general population (29 percent versus 34 percent, respectively). During the community outreach process for developing the Housing Element, the need for senior housing options in Cupertino was highlighted by many residents. Resources Available Cupertino offers a number of resources for seniors. As shown in Table 2.22, there are five residential care facilities for the elderly and three skilled nursing facilities in the city. Residential care facilities for the elderly (RCFEs), also known as “assisted living” or “board and care” facilities, provide assistance with some activities of daily living while still allowing residents to be more independent than in most TABLE 2.21: ELDERLY HOUSEHOLDS BY TENURE AND AGE, 2010 Cupertino Santa Clara County NumberPercentNumberPercent Under 64 Years Old Owner 9,429 58.2%265,72754.0% Renter 6,769 41.8%226,51746.0% Total 16,198100.0%492,244100.0% 65 Plus Years Old Owner 3,198 80.3%82,571 73.8% Renter 785 19.7%29,389 26.2% Total 3,983100.0%111,960100.0% Total Households 20,181 604,204 Percent Householders 65 Plus Years 19.7%18.5% Source: Association of Bay Area Governments (ABAG), Housing Element Data Profiles, December 2013. 543 B-51 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT nursing homes. Skilled nursing facilities—also known as nursing homes—offer a higher level of care, with registered nurses on staff 24 hours a day. In addition to assisted living facilities, there are two subsidized independent senior housing developments in the city. As shown in Table 2.22, there are a total of 100 units of affordable senior housing in Cupertino. Furthermore in 2011, the City utilized CDBG funds to rehabilitate a home that provides accommodation to five low-income seniors. Demand for these subsidized units is high. Staff at Sunny View estimate that over 700 people are on the waiting list, and the turnover rate for available units is about 10 to 15 per year. The Cupertino Senior Center also serves as an excellent resource for seniors. The many different services at the center help seniors to obtain resources in the community that will assist them to continue to remain independent and safe in their own homes. Available programs include various social and recreation activities, special events, travel programs, transportation discounts, drop-in consultation, case management, medical, and social services. Additionally, the Senior Adult Day Care (Cupertino Center) provides frail, dependent, low-income Cupertino seniors with specialized programs of recreation, mental stimulation, exercise, companionship and nutritious meals during the day. This facility is operated by Live Oak Adult Day Care a local non-profit organization. In addition, the City supports a number of programs with Community Development Block Grant (CDBG), General Fund Human Service Grants (HSG) and Below Market-Rate (BMR) Affordable Housing Fund (AHF) funds that provide services specifically for seniors in the community. The Long- Term Care Ombudsman Program, operated by Catholic Charities, provides advocacy for Cupertino seniors in 544 B-52 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT long-term care facilities to ensure they have a voice in their own care and treatment. The program receives, investigates and resolves any complaints associated with the care of long-term care facility residents. A legal assistance program for seniors is provided by Senior Adults Legal Assistance (SALA) which provides free legal services to low- and very low-income seniors at the Cupertino Senior Center. Legal services provided are in the area of consumer complaints, housing, elder abuse, and simple wills. The Live Oak TABLE 2.22: HOUSING RESOURCES FOR THE ELDERLY Residential Care Facilities for the Elderly Location Capacity The Forum at Rancho San Antonio 23500 Cristo Rey Drive 741 Paradise Manor 4 19161 Muriel Lane 6 Pleasant Manor of Cupertino 10718 Nathanson Avenue 6 Purglen of Cupertino 10366 Miller Avenue 12 Sunny View Manor (a)22445 Cupertino Road 190 Total 955 Skilled Nursing Facilities Health Care Center at Forum at Rancho San Antonio 23600 Via Esplendor 48 Cupertino Healthcare & Wellness Center 22590 Voss Avenue 170 Sunny View Manor 22445 Cupertino Road 48 Total 266 Subsidized Independent Senior Rental Housing Sunny View West 22449 Cupertino Road 99 Senior Housing Solutions 19935 Price Avenue 1 Total 100 Adult Day Care Live Oak Adult Day Services 20920 McClellan Road 30 Cupertino Senior Center 21251 Stevens Creek N/A Notes: (a) Sunny View Manor has 115 units for independent and assisted (RCFE) living. All 115 units are licensed as RCFE units, but residents may choose between independent and assisted living options. The distribution of independent and assisted living units varies over time. Sources: California Department of Social Services, Community Care Licensing Division Facility Search Form, 2014; California Department of Public Health, Health Facilities Search, 2014. 545 B-53 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Large Households Large households are defined as those with five or more members. Large households are identified as a special needs group because of limited opportunities for adequately sized and affordable housing. Cupertino has a smaller proportion of large households than Santa Clara County as a whole. As shown in Table 2.23, 9.3 percent of all households in Cupertino were comprised of five or more persons in 2010. In Santa Clara County, about 14.8 percent of households were considered large. Large households were more likely to be homeowners (1,264 households, 67 percent) than renters (619 households, 33 percent). While Cupertino has a smaller proportion of large households than Santa Clara County, its housing stock is comprised of a larger proportion of homes with three or more bedrooms. As shown in Table 2.24, about 64 percent of the housing units in Cupertino had three or more bedrooms while only 59 percent of Santa Clara County homes had three or more bedrooms. Adult Day Care receives partial financial assistance to help operate the Senior Adult Day Care (Cupertino Center). TABLE 2.23: HOUSEHOLD SIZE BY TENURE, 2010 Owner Renter Total NumberPercentNumberPercentNumberPercent Cupertino 1- 4 Persons 11,36390.0%6,93591.8%18,29890.7% 5+ Persons 1,26410.0%6198.2%1,8839.3% Total 12,627100.0%7,554100.0%20,181100.0% Santa Clara County 1- 4 Persons 297,38585.4%217,57885.0%514,96385.2% 5+ Persons 50,91314.6%38,32815.0%89,24114.8% Total 348,298100.0%255,906100.0%604,204100.0% Source: Association of Bay Area Governments (ABAG), Housing Element Data Profiles, December 2013. 546 B-54 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Resources Available Large households in Cupertino can benefit from the general housing programs and services offered by the City, such as the BMR Program and housing rehabilitation programs. Other programs include Mortgage Credit Certificates and Housing Choice Vouchers administered by the County, and homebuyer assistance offered by the Housing Trust Silicon Valley. Single-Parent Households Single-parent households often require special consideration and assistance because of their greater TABLE 2.24: EXISTING HOUSING STOCK BY NUMBER OF BEDROOMS, 2011 Owner Households Renter Households Total NumberPercentNumberPercentNumberPercent Cupertino No Bedroom 0 0.0%2082.9%2081.0% 1 Bedroom 4683.6%1,55421.5%2,02210.0% 2 Bedrooms 1,53011.8%3,49148.4%5,02124.9% 3 Bedrooms 4,78236.9%1,60922.3%6,39131.7% 4 Bedrooms 4,78536.9%3144.4%5,09925.3% 5 or More Bedrooms 1,39610.8%39 0.5%1,4357.1% Total 12,961100.0%7,215100.0%20,176100.0% Santa Clara County No Bedroom 1,0910.3%16,3716.6%17,4622.9% 1 Bedroom 7,4772.1%74,19529.9%81,67213.6% 2 Bedrooms 54,46115.5%94,45338.1%148,91424.8% 3 Bedrooms 147,93342.0%45,45618.3%193,38932.3% 4 Bedrooms 109,89231.2%13,8755.6%123,76720.6% 5 or More Bedrooms 31,0438.8%3,4051.4%34,4485.7% Total 351,897100.0%247,755100.0%599,652100.0% Source: Association of Bay Area Governments (ABAG), Housing Element Data Profiles, December 2013. 547 B-55 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT need for affordable housing and accessible day-care, health care, and other supportive services. Female-headed single-parent households with children, in particular, tend to have a higher need for affordable housing than other family households in general. In addition, these households are more likely to need childcare since the mother is often the sole source of income and the sole caregiver for the children in the household. In 2010, there were 667 female- headed single-parent households with children under 18 years of age in Cupertino, representing 3.3 percent of all households in the City (Table 2.25). A significant proportion of these households were living in poverty in 2011 (21 percent). The U.S. Census Bureau sets poverty level thresholds each year and they are often used to establish eligibility for federal services. The number of female-headed single-parent households declined slightly from 2000, but these households continue to make up the same proportion of all households in the City. Compared to Santa Clara County, the City’s proportion of female-headed single-parent households was lower (five percent versus three percent, respectively). 548 B-56 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Resources Available Single-parent households in Cupertino can benefit from City programs and services that provide assistance to lower income households in general, such as the BMR, CDBG and HSG Programs. Single-parent households can also benefit from supportive and childcare services available to County residents through various organizations, including Catholic Charities of Santa Clara County, Choices for Children, Grail Family Services, InnVision Shelter Network, Second Harvest Food Bank, and West Valley Community Services, among others. 3 3 David Rosen. “Inclusionary Housing and Its Impact on Housing and Land Markets.” NHC Affordable Housing Policy Review 1(3). 2004. TABLE 2.25: FAMILY CHARACTERISTICS, CUPERTINO, 2010 Household Type Number Percent of Total 1-Person Household 3,544 17.6% Male Householder 1,472 7.3% Female Householder 2,072 10.3% 2 or More Person Household 16,637 82.4% Family Households:15,776 78.2% Married-Couple Family 13,802 68.4% With Own Children Under 18 Years 8,392 41.6% Other Family;1,974 9.8% Male Householder, no Wife Present 581 2.9% With Own Children Under 18 Years 216 1.1% Female Householder, no Wife Present 1,393 6.9% With Own Children Under 18 Years 667 3.3% Nonfamily Households:4,405 21.8% Male Householder 1,472 7.3% Female Householder 2,072 10.3% Total Households 20,181 100.0% Source: U.S. Census, 2010. 549 B-57 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Persons with Disabilities A disability is a physical or mental impairment that limits one or more major life activities. Persons with a disability generally have lower incomes and often face barriers to finding employment or adequate housing due to physical or structural obstacles. This segment of the population often needs affordable housing that is located near public transportation, services, and shopping. Persons with disabilities may require units equipped with wheelchair accessibility or other special features that accommodate physical or sensory limitations. Depending on the severity of the disability, people may live independently with some assistance in their own homes, or may require assisted living and supportive services in special care facilities. According to the 2008-2012 ACS, about six percent of Cupertino residents and eight percent of Santa Clara County residents had one or more disabilities (Table 2.27). Hearing, ambulatory, and independent living difficulties were the most common disabilities among seniors, while cognitive difficulties were more common among persons TABLE 2.26: POVERTY STATUS, CUPERTINO, 2011 Families Below Poverty Line Number Percent Married-Couple Family 237 57.5% With Own Children Under 18 Years 115 27.9% Other Family Male Householder 26 6.3% With Own Children Under 18 Years 7 1.7% Female Householder 149 36.2% With Own Children Under 18 Years 87 21.1% Total Families Below Poverty Line 412 100.0% Source: U.S. Census, American Community Survey (ACS), 2007, 2011 550 B-58 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT aged 18 to 64 with disabilities. Overall, ambulatory difficulties were the most prevalent (45.2 percent). Table 2.28 shows that among persons with disabilities aged 18 to 64, the majority (55.8 percent) in both the City and County were not in the labor force. About one-third of both City and County residents (aged 18 to 64) with disabilities were employed. Persons with Developmental Disabilities A recent change in State law requires that the Housing Element discuss the housing needs of persons with developmental disabilities. As defined by the Section 4512 of the Welfare and Institutions Code, “developmental disability” means “a disability that originates before an individual attains age 18 years, continues, or can be expected to continue, indefinitely, and constitutes a substantial disability for that individual. As defined by the Director of Developmental Services, in consultation with the Superintendent of Public Instruction, this term shall include mental retardation, cerebral palsy, epilepsy, and autism. This term shall also include disabling conditions found to be closely related to mental retardation or to require treatment similar to that required for individuals with mental retardation, but shall not include other handicapping conditions that are solely physical in nature. This definition also reflects the individual’s need for a combination and sequence of special, interdisciplinary, or generic services, individualized supports, or other forms of assistance that are of lifelong or extended duration and are individually planned and coordinated. 551 B-59 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT The Census does not record developmental disabilities. However, according to the U.S. Administration on Developmental Disabilities, an accepted estimate of the percentage of the population that can be defined as developmentally disabled is 1.5 percent. This equates to approximately 875 persons with developmental disabilities residing in the City of Cupertino, based on the 2010 Census population. TABLE 2.27: PERSONS WITH DISABILITIES BY DISABILITY TYPE, 2012 Disability Type % of Disabilities Tallied Age 5 to 17Age 18 to 64Age 65+Total Cupertino With a hearing difficulty 17.8%21.6%55.3%40.8% With a vision difficulty 5.3%16.4%10.9%12.7% With a cognitive difficulty 36.2%40.3%21.9%29.5% With an ambulatory difficulty 30.3%32.1%55.0%45.2% With a self-care difficulty 57.9%19.6%20.0%21.5% With an independent living difficulty -- 32.0%46.0%38.6% Total Persons with Disabilities (a)152 1,313 1,9803,445 % of Total Population 6% Santa Clara County With a hearing difficulty 11.8%20.1%41.4%29.8% With a vision difficulty 14.6%16.4%17.4%16.7% With a cognitive difficulty 69.4%41.7%28.0%36.9% With an ambulatory difficulty 17.5%42.3%61.9%50.1% With a self-care difficulty 28.5%17.2%26.9%22.6% With an independent living difficulty -- 36.8%51.4%41.5% Total Persons with Disabilities (a)8,691 62,22165,554136,466 % of Total Population 8% Note: (a) Total does not include population under 5 years of age. Source: U.S. Bureau of the Census, American Community Survey (ACS), 2008-2012. 552 B-60 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT According to the State’s Department of Developmental Services, as of September 2013, approximately 303 Cupertino residents with developmental disabilities were being assisted at the San Andreas Regional Center. Most of these individuals were residing in a private home with their parent or guardian, and 196 of these persons with developmental disabilities were under the age of 18. Many developmentally disabled persons can live and work independently within a conventional housing environment. More severely disabled individuals require a group living environment where supervision is provided. The most severely affected individuals may require an institutional environment where medical attention and physical therapy are provided. Because developmental disabilities exist before adulthood, the first issue in supportive housing for the developmentally disabled is the transition from the person’s living situation as a child to an appropriate level of independence as an adult. Resources Available Table 2.29 summarizes the licensed community care facilities in Cupertino that serve special needs groups. TABLE 2.28: PERSONS AGE 18 TO 64 WITH DISABILITIES BY EMPLOYMENT STATUS, 2012 Cupertino Santa Clara County Persons With a Disability Number Percent of Total Population Number Percent of Total Population Total Population Age 18-64 (a)1,313 100.0%62,221 100.0% Employed 480 36.6%22,566 36.3% Unemployed 101 7.7%4,932 7.9% Not in Labor Force 732 55.8%34,723 55.8% Note: (a) Total does not include population under 18 years of age or over 65 years. Source: U.S. Bureau of the Census, American Community Survey (ACS), 2008-2012. 553 B-61 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Adult residential facilities offer 24-hour non-medical care for adults, ages 18 to 59 years old, who are unable to provide for their daily needs due to physical or mental disabilities. Group homes, small residential facilities that serve children or adults with chronic disabilities, also provide 24-hour care by trained professionals. In addition, a 27-unit multi-family residential property (Le Beaulieu) offers affordable housing to very low-income persons with disabilities. Farmworkers Farmworkers are traditionally defined as persons whose primary incomes are earned through agricultural labor. They have special housing needs because of their relatively low income and also because of the often transient and seasonal nature of their jobs. The 2011 ACS reported that 36 Cupertino residents were employed in the agriculture, farming, fishing and forestry occupations, making up less than 0.1 percent of the City’s population. Resources Available To the extent that farmworkers may want to live in Cupertino, their need for affordable housing would TABLE 2.29: COMMUNITY CARE FACILITIES IN CUPERTINO, 2014 Adult Residential Facilities Location Capacity Paradise Manor 2 19133 Muriel Lane 6 Paradise Manor 3 19147 Muriel Lane 6 Total 12 Group Homes Pace-Morehouse 7576 Kirwin Lane 6 Pacific Autism Center for Education Miracle House 19681 Drake Drive 6 Total 12 Source: California Department of Social Services, Community Care Licensing Division Facility Search Form, 2014 554 B-62 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT be similar to that of other lower income persons, and their housing needs can be addressed through general affordable housing programs for lower-income households, such as BMR, CDBG and HSG programs. Residents Living Below the Poverty Level Families with incomes below the poverty level, specifically those with extremely low and very low incomes, are at the greatest risk of becoming homeless and often require assistance in meeting their rent and mortgage obligations in order to prevent homelessness. The 2007-2011 ACS found that four percent of all Cupertino residents were living below the poverty level. Specifically, about three percent of family households and two percent of families with children were living below the poverty level. These households may require specific housing solutions such as deeper income targeting for subsidies, housing with supportive services, single-room occupancy units, or rent subsidies and vouchers. Resources Available Persons living with incomes below the poverty level can benefit from City programs and services that provide assistance to lower-income households in general, such as BMR, CDBG and HSG programs. Households with incomes below the poverty level can also benefit from supportive services available to County residents through various organizations, including Catholic Charities of Santa Clara County, Choices for Children, InnVision Shelter Network, Second Harvest Food Bank, and West Valley Community Services, among others. Homeless Demand for emergency and transitional shelter in Cupertino is difficult to determine given the episodic nature of homelessness. Generally, episodes of homelessness 555 B-63 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT among families or individuals can occur as a single event or periodically. The 2013 Santa Clara County Homeless Census & Survey reported a point-in-time count of 7,631 homeless people on the streets and in emergency shelters, transitional housing, and domestic violence shelters. This estimate includes 112 homeless individuals in the City of Cupertino. The count, however, should be considered conservative because many unsheltered homeless individuals may not be visible at street locations, even with the most thorough methodology. There is no data presently available documenting the increased level of demand for shelter in Santa Clara County or Cupertino during particular times of the year. Due to the relatively mild climate, the only time of year when increased demand appears to be a factor is during the winter months (November to March). The annual homeless count always takes place in the last week of January, a period when demand for shelter typically is at its highest. Since the year-round need described above is based on the annual count, the need for emergency shelter either year-round or seasonally is not likely to be greater than that found during the annual homeless count. Resources Available Table 2.31 lists facilities within Santa Clara County that serve the needs of homeless. Emergency shelters provide temporary shelter for individuals and families while transitional shelters serve families making a transition from homelessness to permanent housing. In Cupertino, West Valley Community Services (WVCS) offers supportive services and the Transitional Housing Program (THP) through its Haven to Home Program. The Haven to Home Program helps homeless individuals and families work towards stability by providing access to resources such as food, transportation, toiletries and other such items. The 556 B-64 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT program has the capacity to provide housing for 12 single men and six single mothers with one child under the age of six. Residents of THP sign a six-month lease, which may be renewed depending on the resident’s case plan and progress. For supportive services, a case manager is available to provide intensive case management for up to 21 homeless households at a time. The THP typically has a waiting list of 10 to 30 households, while the waiting list for supportive services generally has five to 20 households. Given the increase in requests for emergency shelter over the past few years, WVCS staff believes that there is a need for additional emergency shelter services in Cupertino. This need is particularly high for families with children. Additionally, Faith in Action Silicon Valley Rotating Shelter operates a rotating shelter program which accommodates up to 15 homeless men. The shelter rotates locations, which include various Cupertino congregation and community partner locations. Additional services offered by the program include case management, meals, shower facilities, bus passes, job development and counseling, and other supportive services. TABLE 2.30: SANTA CLARA COUNTY HOMELESS CENSUS AND SURVEY, 2013 (a) Jurisdiction Individuals % Total Cupertino Unsheltered (b)92 82.1% Sheltered (c)20 17.9% Total 112 100.0% Santa Clara County Unsheltered (b)5,674 74.4% Persons in Family Households 1,011 13.2% Sheltered (c)1,957 25.6% Persons in Family Households 56 0.7% Total 7,631 100.0% Notes: (a) This Homeless Census and Survey was conducted over a two day period from January 29 to January 30, 2013 This survey, per HUD new requirements, does not include people in rehabilitation facilities, hospitals or jails due to more narrow HUD definition of point-in-time homelessness. (b) Individuals found living on the streets, in parks, encampments, vehicles, or other places not meant for humanhabitation. (c) Individuals who are living in emergency shelters or transitional housing programs. Source: 2013 Santa ClaraCounty Homeless Point-In-Time Census & Survey, Comprehensive Report. 557 B-65 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT 2.8. Needs Assessment Summary ƒƒCupertino grew faster than Santa Clara County and the Bay Area between 2000 and 2010. The local population increased by 15 percent from 50,600 people to 58,300. However, some of this growth was due to the annexation of 168 acres of unincorporated land in Santa Clara County between 2000 and 2008. ƒƒABAG projects Cupertino will grow to 71,200 residents by 2040. Cupertino and Santa Clara County are anticipated to experience the same rate of population increase (nearly 21 percent) between 2010 and 2040; the Bay Area’s population is expected to increase by 28 percent during the same time. ƒƒCupertino has an aging population. The median age in Cupertino rose from 37.9 years old in 2000 to 39.9 years old in 2010. The percent of elderly residents, aged 65 years old and older, increased from 11 percent to 13 percent. ƒƒThe City has a high percentage of family households; in 2010, family households comprised 77 percent of all households in Cupertino, compared with 71 percent of Santa Clara County households and 65 percent of Bay Area households. ƒƒLarge households comprised 9.3 percent of the City’s total households, the majority of which were owner- households. Overall, the proportion of large households in the City was lower than countywide average. ƒƒApproximately 3.3 percent of all households in the City were single-parent households, with 21 percent living below the poverty level. However, the proportion of single-parent households in the City has declined since 2000. 558 B-66 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT ƒƒAbout six percent of the City’s population aged five and above had one or more disabilities, lower than the countywide average of eight percent. According to the State Department of Developmental Services, 303 residents were being assisted at the San Andreas Regional Center. ƒƒCupertino, along with Santa Clara County, is becoming an increasingly jobs-rich city. ABAG projects the number of jobs in Cupertino will increase by 25 percent between 2010 and 2040, resulting in a jobs-to-household ratio of 1.38 by 2040, up from the ratio of 1.29 in 2010. ƒƒThe local housing stock is dominated by single-family detached homes; 57 percent of homes were single-family detached dwellings in 2013. Although the number of multi-family housing units experienced the most rapid growth between 2000 and 2013, Cupertino still has a smaller proportion of multi-family housing units than Santa Clara County (28 percent in the city versus 32 percent in the County overall). One affordable housing project – Beardon Drive (eight units) – is considered at risk of converting to market-rate housing during the next ten years. ƒƒHousing costs continue to rise in Cupertino. Median home sales prices rose by approximately 29 percent between 2011 and 2013, after plateauing between 2008 and 2010 during the depth of the housing market crisis. Homeownership in Cupertino is generally out of reach for most except the highest-earning households. ƒƒAffordable rental housing is equally difficult to obtain. The current median market rent rate of $3,500 for a three-bedroom unit exceeds the maximum affordable monthly rent for lower- and moderate-income households. 559 B-67 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT TABLE 2.31: HOMELESS FACILITIES IN SANTA CLARA COUNTY, 2014 Organization Facility Address Total Capacity Transitional Housing EHC LifeBuilders Transitional (Families With Children) Boccardo Family Living Center 13545 Monterey Road San Martin, CA 95046 26 Units EHC LifeBuilders Transitional (Veterans) Boccardo Regional Reception Center 2011 Little Orchard St. San Jose, CA 95125 20 Beds EHC LifeBuilders Transitional (Youth) Sobrato House Youth Center 496 S. Third Street San Jose, CA 95112 9 Units Family Supportive Housing Transitional (Families)Scattered Sites in Santa Clara County Not available InnVision Transitional Montgomery Street Inn 358 N. Montgomery Street San Jose, CA 95110 85 Persons InnVision Transitional (Women and Children) Villa 184 South 11th Street San Jose, CA 95112 55 Persons Next Door Solutions to Domestic Violence Transitional (Victims of Domestic Violence - Women and Children) The HomeSafes in San Jose and Santa Clara (a)48 Units West Valley Community Services Transitional (Men and Single Mothers) 10311-10321 Greenwood Ct. Cupertino, CA 95014 12 Single Men and 6 Single Mothers Maitri Transitional (Women and Children) N/A (address is confi- dential)9 Beds Note: (a) Location is confidential. Source: 211 Santa Clara County, 2014. 560 B-68 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT TABLE 2.31: HOMELESS FACILITIES IN SANTA CLARA COUNTY, 2014 Organization Facility Address Total Capacity Emergency Shelters Asian Americans For Community Involvement of Santa Clara County, Inc. Emergency (Victims of Domestic Violence - Women and Children) Asian Women's Home 2400 Moorpark Avenue, Suite 300 12 persons EHC LifeBuilders Emergency Boccardo Reception Center (BRC) 2011 Little Orchard San Jose, 95125 200 Persons (Year Round) 250 Persons (December 2 to March 31) EHC LifeBuilders Emergency Sunnyvale National Guard Armory 620 E. Maude Sunnyvale, 94086 125 Persons EHC LifeBuilders Emergency (Veterans) Boccardo Reception Center (BRC) 2011 Little Orchard San Jose, 95125 40 Persons (December 2 to March 31) EHC LifeBuilders Emergency (Youth) Sobrato House Youth Center 496 S. Third Street San Jose, CA 95112 10 beds Family Supportive Housing Emergency (Families) San Jose Family Shelter 692 North King Road San Jose, CA, 951331667 35 Families Faith In Action Silicon Valley Rotating Shelter Emergency Faith In Action Silicon Valley Rotating Shelter 1669-2 Hollenbeck Ave. #220 Sunnyvale, CA 94087 15 Persons InnVision Emergency Julian Street Inn 546 West Julian Street San Jose, CA, 95110 70 Beds InnVision Emergency (Women and Children) 260 Commercial Street San Jose, CA, 95112 55 Persons Next Door Solutions to Domestic Violence Emergency (Victims of Domestic Violence - Women and Children) The Shelter Next DoorSanta Clara County (a)20 Persons 561 B-69 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT ƒƒIn 2010, 30 percent of renters and 37 percent of homeowners were overpaying for housing in Cupertino. ƒƒIn 2010, 63 percent of elderly renter-households were overpaying for housing, the highest rate among any household type regardless of tenure. ƒƒThe 2013 Santa Clara County Homeless Survey reported a point-in-time count of 7,631 homeless people on the streets and in emergency shelters, transitional housing, and domestic violence shelters, including 112 individuals in the City of Cupertino. 3. REGIONAL HOUSING NEEDS DETERMINATIONS 2014-2022 This section discusses the projected housing needs for the current planning period, which runs from January 1, 2014 through October 31, 2022. 3.1. Regional Housing Needs Allocation (RHNA) Pursuant to California Government Code Section 65584, the state, regional councils of government (in this case, ABAG), and local governments must collectively determine each locality’s share of regional housing need. In conjunction with the state-mandated housing element update cycle that requires Bay Area jurisdictions to update their elements by January 31, 2015, ABAG has allocated housing unit production needs for each jurisdiction within the Bay Area. These allocations set housing production goals for the planning period that runs from January 1, 2014 through October 31, 2022. The following summarizes ABAG’s housing need allocation for Cupertino, along with housing production data for the 2014-2022 time period. The City of Cupertino may count housing units constructed, approved, or proposed since 562 B-70 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT January 1, 2014 toward satisfying its RHNA goals for this planning period. Table 3.1 presents a summary of ABAG’s housing needs allocation for Cupertino for 2014 to 2022. 3.2 Housing Needs for Extremely Low-Income Households State law requires housing elements to quantify and analyze the existing and projected housing needs of extremely low-income households. HUD defines an extremely low- income household as one earning less than 30 percent of AMI. These households encounter a unique set of housing situations and needs, and may often include special needs populations or represent families and individuals receiving public assistance, such as social security insurance (SSI) or disability insurance. As discussed in the Needs Assessment section, approximately eight percent of all Cupertino households earned less than 30 percent of AMI in 2010. Extremely low- income households represented 12 percent of all renter- households and five percent of all owner-households. To estimate the projected housing need for extremely low income households, state law allows either assuming 50 percent of the very low-income households as extremely low TABLE 3.1: RHNA, CUPERTINO, 2014-2022 Income Category Projected Need Percent of Total Extremely Low/Very Low (0-50% of AMI)356 33.5% Low (51-80% of AMI)207 19.5% Moderate (81-120% of AMI)231 21.7% Above Moderate (over 120% AMI)270 25.4% Total Units 1,064 100.0% Source: ABAG Regional Housing Needs Assessment, 2014. 563 B-71 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT income, or to apportion the very low-income households based on Census-documented distribution. Using the allowable even split, 50 percent of Cupertino’s 356 very low- income RHNA units are assumed to serve extremely low- income households. Based on this methodology, the city has a projected need of 178 units for extremely low-income households. Extremely low-income households often rely on supportive or subsidized housing as a means of transitioning into stable, more productive lives. Supportive housing combines housing with supportive services such as job training, life skills training, substance abuse programs, and case management services. Subsidized housing can include programs such as the Section 8 Housing Choice Voucher Program or tenant-based rental assistance (TBRA) which ensures that the tenant does not pay more than 30 percent of their gross income on housing by paying a portion of the tenants rent. Efficiency studios and BMR rental units can also provide affordable housing opportunities for extremely low- income households. 4. HOUSING CONSTRAINTS Section 65583(a)(4) of the California Government Code states that the housing element must analyze “potential and actual governmental constraints upon the maintenance, improvement, or development of housing for all income levels, including land use controls, building codes and their enforcement, site improvements, fees and other exactions required of developers, and local processing and permit procedures.” In addition to government constraints, this section assesses other factors that may constrain the production of affordable housing in Cupertino. These include infrastructure availability, environmental features, economic and financing 564 B-72 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT constraints, market conditions and community acceptance of different housing types and densities. Recent court rulings have removed some of the mechanisms local government traditionally has used to require developers to provide affordable housing, thus exacerbating the difficulty of meeting the number of units determined necessary by the regional housing needs assessment. 4.1. Government Constraints Government regulations can affect housing costs by limiting the supply of buildable land, setting standards and allowable densities for development, and exacting fees for the use of land or the construction of homes. The increased costs associated with such requirements are often passed on to consumers in the form of higher home prices and rents. Potential regulatory constraints include local land use policies (as defined in a community’s general plan), zoning regulations and their accompanying development standards, subdivision regulations, growth control ordinances or urban limit lines, and development impact and building permit fees. Lengthy approval and processing times also may be regulatory constraints. General Plan The Cupertino General Plan 2000-2020 was completed in November 2005. The General Plan provides the policy and program direction necessary to guide land use decisions in the first two decades of the 21st century. The existing General Plan is current and legally adequate and is not considered an impediment to housing production. Parallel with the update of this Housing Element, the City undertook a focused update to the Land Use and Circulation Elements to respond to community interest in enlivening aging commercial developments and better accommodating housing need, among requests from some property owners for General Plan Amendments. 565 B-73 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT As required by state law, the General Plan includes a land use map indicating the allowable uses and densities at various locations in the city. The Land Use/Community Design section identifies five categories of residential uses based on dwelling unit density, expressed as the number of dwelling units permitted per gross acre. ƒƒThe “Very Low Density” classification, intended to protect environmentally sensitive areas from extensive development and to protect human life from hazards associated with floods, fires, and unstable terrain, applies one of four slope-density formulas to determine allowable residential density. ƒƒThe “Low Density” and “Low/Medium Density” categories promote traditional single-family development, allowing densities of one to five units per gross acre, and five to 10 units per gross acre, respectively. ƒƒThe “Medium/High Density” and the “High Density” categories provide for a wide range of multi-family housing opportunities at densities of 10 to 20 units per gross acre and 20 to 35 units per gross acre, respectively. In addition to the five residential categories, the General Plan allows for residential uses in the “Industrial/ Residential,” “Office/Commercial/Residential,” “Commercial/Residential” and “Neighborhood Commercial/ Residential” land use categories. In 2013 the City undertook a focused General Plan Amendment process intended to replenish, re-allocate, and increase City-wide office, commercial, hotel, and residential allocations in order to plan for anticipated future development activity while keeping with the community’s character, goals, and objectives. In addition, the process aimed to capture retail sales leakage and some amount 566 B-74 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT of regional demand for office and hotel development. The residential increases proposed during the process are consistent with 2040 One Bay Area Plan. None of the City’s General Plan policies have been identified as housing constraints. The General Plan does not define whether residential units are to be rented or owned or whether they are to be attached or detached. The General Plan’s land use policies incorporate housing goals, including the following: Policy LU-1: Focus Development in Mixed-Use Special Areas In the mixed-use Special Areas where office, commercial and residential uses are allowed, focus higher intensity development and increased building heights where appropriate in designated Special Areas, gateways and nodes. Policy LU-17: Multi-Family Residential Design Maintain a superior living environment for multi-family dwellings. Policy LU-18: Single-Family Residential Design Preserve the character of residential neighborhoods by requiring new development to be compatible with the existing neighborhood. Policy LU-19: Compatibility of Lot Sizes Ensure that zoning, subdivision, and lot line adjustment requests related to lot size or lot design consider the need to preserve neighborhood lot patterns. Policy LU-22: Jobs/Housing Balance Strive for a more balanced ratio of jobs and housing units. 567 B-75 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT The General Plan contains very few policies addressing the siting of housing, other than those pertaining to hillside and other sensitive areas. Land use policies limit development in hillside areas to protect hillside resources but allows for low-intensity residential development in the foothills. The General Plan also encourages the clustering of new development away from sensitive areas such as riparian corridors, wildlife habitat and corridors, public open space preserves and ridgelines. Thus, even in hillside and sensitive areas, the General Plan creates opportunities for housing production. Zoning Ordinance The Cupertino Zoning Ordinance establishes development standards and densities for new housing in the City. These regulations include minimum lot sizes, maximum number of dwelling units per acre, lot width, setbacks, lot coverage, maximum building height, and minimum parking requirements. These standards are summarized in Table 4.1. As required by state law, the Zoning Map is consistent with the General Plan. The residential zoning districts and their respective permitted densities and development standards are summarized below. Residential development is permitted by right in residential zones. R-1 Single Family Residential The R-1 District is intended to create, preserve, and enhance areas suitable for detached single-family dwellings. The R-1 District includes sub-areas with varying minimum lot size requirements. Residential structures in the R-1 District are limited in size by a maximum lot coverage of 45 percent and a maximum floor area ratio of 45 percent. Setbacks are 20 feet in the front and rear yards and a combined 15 feet of side yards, with no one side yard setback less than 5 feet. The maximum building height of 28 feet allows for a wide range of single family housing types on flat terrain. 568 B-76 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT TABLE 4.1: SUMMARY OF CITY ZONING STANDARDS Minimum Yard Setback Zone District Bldg. Ht. (ft.) Min. Lot Width (ft.) FrontSide Rear Min. Lot Area (sq. ft.) Site Coverage A 18-2850-603020 25 215,000 N/A A-120-282003020 20-25 43,000-215,00040% R-1 286020-2510-15 20 5,000-20,00045% R-215-3060-70206-12 20 ft./20% lot depth, whichever is greater 8,500-15,00040% R-3 3070206-18 20 ft./20% lot depth, whichever is greater.9,300 40% RHS307020-2510-15 25 20,000-400,00045% R-1C30N/AN/AN/A N/A N/A N/A Note: (a) Maximum number of units cannot exceed that allowed by the General Plan, pursuant to the Zoning Ordinance. Sources: Cupertino Municipal Code, 2014. Structures in R-1 Districts with an “i” designation at the end are limited to one story (18 feet). Two-story structures in the R-1 District require a Two- Story Residential Permit. The Director of Community Development may approve, conditionally approve, or deny applications for a two-story residential permit. Projects must be “harmonious in scale and design with the general neighborhood.” R-2 Residential Duplex The R-2 District is intended to allow a second dwelling unit under the same ownership as the initial dwelling unit on a site. The residential duplex district is intended to increase the variety of housing opportunities within the community while maintaining the existing neighborhood character. Minimum lot area is 8,500 square feet; building heights in this district cannot exceed 30 feet. The R-2 District limits lot coverage by all buildings to 40 percent of net lot area. 569 B-77 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Setbacks are 20 feet in the front yard and the greater of 20 feet and 20 percent of lot depth in the rear yard; the minimum side yard setback is 20 percent of the lot width. Structures in R-2 Districts with an “i” designation at the end are limited to one story (18 feet). The development standards for the R-2 District do not constrain the development of duplexes. The 30-foot height limit is appropriate because many R-2 zoned areas abut single-family residential development. Furthermore, 30 feet in height is sufficient for duplex development. The 40 percent maximum lot coverage has also not constrained the development of duplexes in Cupertino. None of the residential opportunity sites included in this Housing Element fall within the R-2 zone. R-3 Multi-Family Residential The R-3 District permits multi-family residential development. This District requires a minimum lot area of 9,300 square feet for a development with three dwelling units and an additional 2,000 square feet for every additional dwelling unit. The minimum lot width in the R-3 District is 70 feet, and lot coverage may not exceed 40 percent of net lot area. For single-story structures, required setbacks are 20 feet in the front yard, six feet in the side yard, and the greater of 20 feet or 20 percent of lot depth in the rear yard; the minimum side yard setback for two-story structures is nine feet. The maximum height any building is two stories and may not exceed 30 feet. This height limit is used because many R-3 districts abut single-family residential neighborhoods. Basements (fully submerged below grade except for lightwells required for light, ventilation and emergency egress, which may have a maximum exterior wall height of two feet between natural grade and ceiling) are permitted and are not counted towards the height requirements. For these reasons, the 570 B-78 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT height standards in the R-3 district are not considered a constraint to housing production. Furthermore, the development standards for the R-3 District are on par with standards present in neighboring jurisdictions. The development standards for the R-3 District do not unreasonably constrain the development of multi-family housing. Multi-family residential uses are permitted uses in the R-3 District without the need for a Use Permit. Developments are able to achieve close to the maximum allowable densities under existing development standards, including the height limit and maximum lot coverage. This can be demonstrated by a back-of-the-envelope calculation of the number of developable units on a one- acre parcel. As shown in Table 4.2, the maximum density allowed on a one-acre parcel is 20 units. With a maximum lot coverage of 40 percent and assuming two stories of residential development, approximately 35,000 square feet of residential development can be achieved. Using conservative assumptions of 20 percent common area space and large unit sizes of 1,400 square feet, 20 units can be developed under this scenario. This analysis demonstrates that projects would be able to achieve the maximum allowable density in the R-3 District under the development standards. This Housing Element includes a strategy to monitor the development standards to facilitate a range of housing options (HE-Strategy 1). RHS Residential Hillside The RHS District regulates development in the hillsides to balance residential uses with the need to preserve the natural setting and protect life and property from natural hazards. Dwelling unit density is determined by the slope- density standards outlined in the General Plan. Minimum lot size ranges from 20,000 square feet to 400,000 square feet. 571 B-79 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT The minimum lot width in the RHS District is 70 feet, with an exception for lots served by a private driveway and which do not adjoin a public street. Development applications in the RHS District must include topographical information, including whether the proposed structure is on or in the site line of a prominent ridgeline. The City has established a process to allow for exceptions to development requirements in the RHS zone if certain stated findings can be made. R-1C Residential Single Family Cluster The purpose of the R-1C District is to provide a means for reducing the amount of street improvements and public utilities required in residential development, to conserve natural resources, and encourage more creative TABLE 4.2: R3 DISTRICT DEVELOPMENT EXAMPLE Assumptions Parcel Size (Sq. Ft.)43,560 Maximum Density 20.13 9,300 sq. ft. of lot area for 3 units, 2,000 sq. ft. for each additional unit. Parking and circulation (sq. ft.)19,602 Parking and circulation45% of lot area Open space (sq. ft.)6,534 Open space 15% of lot area Lot Coverage (sq. ft.)17,424 Lot Coverage %40% of lot area Residential Sq. Ft.34,848 Stories of Residential 2 Less Common Area (hallways, stairs)(6.970 Common Area %20% of total building area Sq. Ft. for Units 27,878 Number of Units 20 Unit Size (Sq. Ft.)1,400 572 B-80 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT development and efficient use of space. The owner of a property within Cupertino may submit an application for single-family residential cluster zoning or rezoning to the Planning Commission. Alternatively, the Planning Commission and/or the City Council may initiate a public hearing to rezone specific properties to the R-1C District. The allowable density on a parcel is determined by the existing land use designations in place prior to the rezoning. Density ranges are determined based on the relationship with and impacts to surrounding neighborhoods, streets, infrastructure and natural areas as well as the quality of design and relationship to adopted Housing Element goals. While the maximum height in the district is 30 feet, a height increase may be permitted if the City Council or Planning Commission determines that it would not have an adverse impact on the immediately adjacent neighborhood. The R-1C District also regulates site design and private streets within the cluster. Development requirements for proposed R-1C developments can be waived or modified, if the Planning Commission and City Council find that the site is constrained but substantially meets the zoning standards or if the proposal provides for low-moderate income and senior citizen housing. Planned Development The P district is intended to provide a means for guiding land development that is uniquely suited for planned coordination of land uses and to provide for a greater flexibility of land use intensity and design. The planned development zoning district is specifically intended to encourage variety in the development pattern of the community; to promote a more desirable living environment; to encourage creative approaches in land development; to provide a means of reducing the amount of improvements required in development through better 573 B-81 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT design and land planning, to conserve natural features, to facilitate a more aesthetic and efficient use of open spaces, and to encourage the creation of public or private common open space. All P districts are identified on the zoning map with the letter P followed by a specific reference to the type of use allowed in the particular planned development district. For example, a P(Res) district allows for residential uses. Developments within a P district are generally required to comply with the height and density regulations associated with the underlying use. Beyond density and height regulations, the P district allows for a greater degree of flexibility around other development standards. The increased flexibility in the P zones allow a project to be designed to the special characteristics of a site (such as corner parcels, proximity to a creek or open space, etc) without requiring variances or exceptions. Such sites can include a combination of multiple housing types, open space and a mix of uses in a single area. Examples include the Main Street Cupertino and Rose Bowl mixed use developments. A majority of the housing sites proposed to accommodate the RHNA are located in the P district. The majority of the P districts are governed by a Specific or Conceptual Plan which provides additional guidance to facilitate development review and provide more certainty regarding community expectations. For example, the Heart of the City Specific Plan provides detailed guidelines for residential and mixed-use developments (including orientation, design, setbacks, landscaping, buffers, and transitions to neighboring properties). Prior to development within a P (Res/R3) district, applicants must submit a definitive development plan to the Planning Commission or City Council. Upon recommendation of the Planning Commission, the City Council reviews 574 B-82 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT larger developments, including those with eight or more residential units. Multi-family residential developments within a P(Res/R3) district are permitted uses by right. Development plans focus on site and architectural merits and typically take between two to four months to obtain approvals. The Municipal Code was amended in 2011 to clarify that the development plan for residential uses only requires a planned development permit and not a conditional use permit as residential developments are permitted uses within a P(Res) district. A Agricultural and A-1 Agricultural-Residential Agricultural zones are intended to preserve agriculture or forestry activities in areas suited to that purpose, and to include incidental residential development of a rural or semi-rural character. Single-family dwellings and residences for farmworkers and their families are permitted in the A and A-1 Districts. Minimum lot area corresponds to the number (multiplied by one thousand square feet) following the A zoning symbol. For example, A1-43 requires a minimum 43,000 square foot lot. The minimum lot size for the A District is 215,000 square feet (with or without incidental residential use) and 215,000 square feet for A-1 with no incidental residential use. Incidental residential uses require a minimum of 43,000 square feet per dwelling unit. The District requires setbacks of 30 feet in the front yard, 20 feet in the side yards, and 20-25 feet in the rear yard. The maximum building height of 28 feet allows for a wide range of single family housing types on flat terrain. Structures in the A District with an “i” designation at the end are limited to one story (18 feet). Other Districts In addition to the districts discussed above, limited residential uses are allowed in other zoning districts. Often 575 B-83 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT the housing in these non-residential districts is limited to housing for employees or caretakers. The permitted residential uses in non-residential districts are discussed below. ML Light Industrial Residential dwellings for caretakers or watchmen are permitted for those employed for the protection of the principal light industrial permitted use. The residential dwellings must be provided on the same lot as the principal permitted use. PR Park and Recreation The PR District regulates publicly owned parks within the City. Single-family residences for the purpose of housing a caretaker for the park are permitted in this District. A caretaker is defined as a person who maintains surveillance of the park areas during and after the hours of park operation. The residence may take the form of a mobile home or a permanent residential structure. Heart of the City The Heart of the City Specific Plan provides specific development guidance for one of the most important commercial corridors in the City of Cupertino. This Specific Plan is intended to carefully guide development, with the purpose of creating a clear sense of place and community identity in Cupertino. The Specific Plan contains streetscape design, development standards and design guidelines for multi-unit residential and commercial/office projects. Any new residential development within the Heart of the City Specific Plan area is required to include a nonresidential component (that is, horizontal or vertical mixed use is required if residential uses are proposed). For mixed use developments in the Heart of the City Specific Plan area, 576 B-84 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT TABLE 4.3: OFF-STREET PARKING REQUIREMENTS Housing Type Zone Parking Ratio Single-Family R-1, RHS, A-1, P 4 / DU (2 garage, 2 open) Small Lot Single-Family, Townhouse P 2.8 / DU (2 garage, 0.8 open) Duplex R-2 3 / DU (1.5 enclosed, 1.5 open) High Density Multi-Family R-3, P 2 / DU (1 covered, 1 open) Sources: Cupertino Zoning Ordinance, 2014. residential development density calculations are required to be based on net density, excluding parking and/ or land areas devoted to the commercial portion of the development. This requirement can significantly reduce the number of units a proposed project may provide, and may constrain new development, although it will forward City goals for balanced and complementary land uses. Parking Excessive parking requirements may serve as a constraint of housing development by increasing development costs and reducing the amount of land available for project amenities or additional units. Off-street residential parking requirements vary by zone. As shown in Table 4.3, the parking ratio ranges from two parking spaces per dwelling unit to four spaces per dwelling unit. Cupertino’s parking requirements are higher than many other jurisdictions, particularly for single-family homes. Given the high cost of land and parking, the high parking standards may serve as a constraint to housing provision, although projects are able to attain the maximum permitted density even with these parking requirements. The Zoning Ordinance does not include parking reductions for senior housing, affordable housing, or group homes, unless State Density Bonus law applies, in which case reductions are available for senior housing and projects that include affordable housing. Often, vehicle ownership among 577 B-85 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT elderly and lower-income households is lower than other populations, making reductions in parking requirements appropriate. As established in HE-Strategy 11 of this Housing Element, the City will offer a range of incentives to facilitate the development of affordable housing, including parking standards waivers. The Zoning Ordinance allows for shared parking in mixed-use developments. For example, residential projects with a retail or commercial component will have a lower parking requirement because residential users may use some retail parking spaces in the evening. The Zoning Ordinance provides a formula for calculating the parking reduction in mixed-use developments. In addition, the Planning Commission or City Council may allow further reduction in the parking requirement as part of a use permit development plan or parking exception based on shared parking arrangements, parking surveys, and parking demand management measures. According to interviews conducted as part of the Housing Element update in 2013, market-rate and non- profit developers perceive policies and regulations such as parking requirements, height limits, and variances for density as barriers to developing and adding units to the market. One interviewee noted that Cupertino’s parking requirements are relatively stringent compared to other cities on the Peninsula that are moving towards more flexibility and lower requirements. To address this concern, the City offers reduced parking requirements as incentives to facilitate affordable housing (HE-Strategy 11) and will update the Density Bonus Ordinance (HE-Strategy 12) to allow for one to three regulatory concessions that would result in identifiable cost reductions and which are needed to make proposed housing affordable. 578 B-86 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Provisions for a Variety of Housing Types Housing element law specifies that jurisdictions must identify adequate sites through appropriate zoning and development standards to encourage the development of various types of housing. This includes single- and multi- family housing, homeless shelters, group homes, supportive and transitional housing, SROs, mobile and manufactured homes, among others. Homeless Shelters The Zoning Ordinance allows for permanent and rotating homeless shelters in the Quasi Public Building (BQ) zone. Rotating homeless shelters are permitted within existing church structures in the BQ zone for up to 25 occupants. The operation period of rotating shelters cannot exceed two months in any one-year span at a single location. Permanent emergency shelter facilities are permitted in the BQ zone if the facility is limited to 25 occupants, provides a management plan, and if occupancy is limited to six months or fewer. The City included Strategy 22 in the Housing Element to ensure continued facilitation of housing opportunities for special needs persons through emeregency housing options. Group Homes and Transitional and Supportive Housing Pursuant to state law, licensed residential care facilities for six or fewer residents are permitted by right in all residential districts (including A, A-1, R-1, R-2, R-3, RHS, R-1C). Licensed small group homes are not subject to special development requirements, policies, or procedures which would impede such uses from locating in a residential district. Furthermore, small group homes (with six or fewer persons) with continuous 24-hour care are permitted by right in all residential districts. Transitional and supportive housing is treated as a residential use and subject only 579 B-87 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT to those restrictions that apply to other residential uses in the same zone. Large group homes (with more than six residents) are conditionally permitted uses in the R-1 District, subject to Planning Commission approval. Single-Room Occupancy Units (SROs) SRO units are one-room units intended for occupancy by a single individual. They are distinct from a studio or efficiency unit, in that a studio is a one-room unit that must contain a kitchen and bathroom. Although SRO units are not required to have a kitchen or bathroom, many SROs have one or the other. The Cupertino Zoning Ordinance does not contain specific provisions for SRO units. SRO units are treated as a regular multi-family use, subject to the same restrictions that apply to other residential uses in the same zone. Manufactured Housing Manufactured housing and mobile homes can be an affordable housing option for low- and moderate-income households. According to the Department of Finance, as of 2013, there are no mobile homes in Cupertino. Pursuant to State law, a mobile home built after June 15, 1976, certified under the National Manufactured Home Construction and Safety Act of 1974, and built on a permanent foundation may be located in any residential zone where a conventional single-family detached dwelling is permitted subject to the same restrictions on density and to the same property development regulations. 580 B-88 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Farmworker and Employee Housing Pursuant to the State Employee Housing Act, any employee housing consisting of no more than 36 beds in a group quarters or 12 units or spaces designed for use by a single family or household shall be deemed an agricultural land use. No conditional use permit, zoning variance, or other zoning clearance shall be required of this employee housing that is not required of any other agricultural activity in the same zone. The permitted occupancy in employee housing in a zone allowing agricultural uses shall include agricultural employees who do not work on the property where the employee housing is located. The Employee Housing Act also specifies that housing for six or fewer employees be treated as a residential use. In 2014, the City amended the Zoning Ordinance to be consistent with the State Employee Housing Act, permitting employee housing for six of fewer residents in all residential zoning districts and employee group quarters in the A and A-1 districts, and in the RHS district with approval of an Administrative CUP. Second Dwelling Units A second dwelling unit is an attached or detached, self- contained unit on a single-family residential lot. These units are often affordable due to their smaller size. To promote the goal of affordable housing within the City, Cupertino’s Zoning Ordinance permits second dwelling units on lots in Single-Family Residential (R-1), Residential Hillside (RHS), Agricultural (A), and Agricultural Residential (A-1) Districts. Second dwelling units on lots of 10,000 square feet or more may not exceed 800 square feet, while units on lots smaller than 10,000 square feet cannot exceed 640 square feet. All second dwelling units must have direct outside access without going through the principal dwelling. If the residential lot encompasses less than 10,000 square feet, the second dwelling unit must be attached to the principal 581 B-89 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT dwelling unless otherwise approved by the Director of Community Development through Architectural Review. Second dwelling units are subject to an architectural review by the Director of Community Development. The design and building materials of the proposed second unit must be consistent with the principal dwelling. In addition, the second dwelling unit may not require excessive grading which is visible from a public street or adjoining private property. The architectural review is done at the ministerial (building permit) level and is intended to ensure that the second unit is consistent with the architecture, colors, and materials of the primary house. One additional off-street parking space must be provided if the principal dwelling unit has less than the minimum off- street parking spaces for the residential district in which it is located. Second dwelling units must also comply with the underlying site development regulations specified by the zoning district. Density Bonus State law requires cities and counties to grant a density bonus of up to 35 percent and one to three incentives or concessions to housing projects which contain one of the following: ƒƒAt least 5% of the housing units are restricted to very low income residents ƒƒAt least 10% of the housing units are restricted to lower income residents ƒƒAt least 10% of the housing units in a for-sale common interest development are restricted to moderate income residents A density bonus, but no incentives or concessions, must be granted to projects that contain one of the following: 582 B-90 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT ƒƒThe project donates at least one acre of land to the city or county large enough for 40 very low income units, the land has the appropriate general plan designation, zoning, permits and approvals, and access to public facilities needed for such housing, funding has been identified, and other requirements are met ƒƒThe project is a senior citizen housing development (no affordable units required) ƒƒThe project is a mobile home park age restricted to senior citizens (no affordable units required) HE-Strategy 12 in the Housing Plan commits the City to implementation of the Density Bonus Ordinance. Site Improvement Requirements Residential developers are responsible for constructing road, water, sewer, and storm drainage improvements on new housing sites. Where a project has off-site impacts, such as increased runoff or added congestion at a nearby intersection, additional developer expenses may be necessary to mitigate impacts. These expenses may be passed on to consumers. Chapter 18 of the Cupertino Municipal Code (the Subdivision Ordinance) establishes the requirements for new subdivisions, including the provision of on- and off-site improvements. The ordinance requires that subdivisions comply with frontage requirements and stormwater runoff be collected and conveyed by an approved storm drain system. Furthermore, each unit or lot within the subdivision must be served by an approved sanitary sewer system, domestic water system, and gas, electric, telephone, and cablevision facilities. All utilities within the subdivision and along peripheral streets must be placed underground. 583 B-91 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Common residential street widths in Cupertino range from 20 feet (for streets with no street parking) to 36 feet (for those with parking on both sides). The City works with developers to explore various street design options to meet their needs and satisfy public safety requirements. Developers are typically required to install curb, gutters, and sidewalks, however, there is a process where the City Council can waive the requirement. The City prefers detached sidewalks with a landscaped buffer in between the street and the pedestrian walk to enhance community aesthetics and improve pedestrian safety. However, the City does work with developers to explore various frontage improvement options depending on the project objectives, taking into consideration factors such as tree preservation, land/design constraints, pedestrian safety, and neighborhood pattern/compatibility. This is especially true in Planned Development projects, where the City works with the developer to achieve creative and flexible street and sidewalk designs to maximize the project as well as community benefits. The Subdivision Ordinance also includes land dedication and fee standards for parkland. The formula for dedication of park land for residential development is based on a standard of three acres of parkland per 1,000 persons. The developer must dedicate parkland based on this formula or pay an in lieu fee based on the fair market value of the land. In addition to parkland dedication, the City Council may require a subdivider to dedicate lands to the school district(s) as a condition of approval of the final subdivision map. If school site dedication is required and the school district accepts the land within 30 days, the district must repay the subdivider the original cost of the dedicated land plus the cost of any improvements, taxes, and maintenance of the dedicated land. If the school district does not accept 584 B-92 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT the offer, the dedication is terminated. The developer may also be required to reserve land for a park, recreational facility, fire station, library, or other public use if such a facility is shown on an adopted specific plan or adopted general plan. The public agency benefiting from the reserved land shall pay the developer the market value of the land at the time of the filing of the tentative map and any other costs incurred by the developer in the maintenance of the area. The ordinance states that the amount of land to be reserved shall not make development of the remaining land held by the developer economically unfeasible. The City of Cupertino’s site improvement requirements for new subdivisions are consistent with those in surrounding jurisdictions and do not pose a significant constraint to new housing development. Building Codes and Code Enforcement The City of Cupertino has adopted the 2013 Edition of the California Building Code, the 2013 California Electrical Code and Uniform Administrative Code Provisions, the International Association of Plumbing Officials Uniform Plumbing Code (2013 Edition), the California Mechanical Code 2013 Edition, and the 2013 California Fire Code and the 2013 Green Building Standard Code. The City also enforces the 1997 Edition of the Uniform Housing Code, the 1998 Uniform Code for Building Conservation, and the 1997 Uniform Code for the Abatement of Dangerous Buildings Code. Cupertino has adopted several amendments to the 2013 California Building Code. The City requires sprinkler systems for new and expanded one- and two-family dwellings and townhouses; underhanging appendages enclosed with fire-resistant materials; roof coverings on new buildings 585 B-93 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT and replacement roofs complying with the standards established for Class A roofing, the most fire resistant type of roof covering. The amendments also establish minimum standards for building footings, seismic reinforcing on attached multi-family dwellings, and brace wall panel construction. These amendments apply more stringent requirements than the California Building Code. The California Building Code and the City’s amendments to it have been adopted to prevent unsafe or hazardous building conditions. The City’s building codes are reasonable and would not adversely affect the ability to construct housing in Cupertino. The City’s code enforcement program is an important tool for maintaining the housing stock and protecting residents from unsafe or unsightly conditions. The Code Enforcement Division is responsible for enforcing the provisions of the Cupertino Municipal Code and various other related codes and policies. Code Enforcement Division staff work to achieve compliance through intervention, education, and enforcement, partnering with the community to enforce neighborhood property maintenance standards. Code Enforcement staff investigate and enforce City codes and State statutes based on complaints received. Violation of a code regulation can result in a warning, citation, fine, or legal action. If a code violation involves a potential emergency, officers will respond immediately; otherwise, Code Enforcement staff responds to complaints through scheduled inspections. The City has had to declare only three units unfit for human occupancy since 2007 and most complaints are resolved readily. Code Enforcement activities are not considered a constraint to development of housing in Cupertino. Constraints for Persons with Disabilities California Senate Bill 520 (SB 520), passed in October 2001, requires local housing elements to evaluate constraints 586 B-94 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT for persons with disabilities and develop programs which accommodate the housing needs of disabled persons. Procedures for Ensuring Reasonable Accommodation Both the federal Fair Housing Act and the California Fair Employment and Housing Act impose an affirmative duty on cities and counties to make reasonable accommodations in their zoning and land use policies when such accommodations are necessary to provide equal access to housing for persons with disabilities and do not impose significant administrative or financial burdens on local government or undermine the fundamental purpose of the zoning law. Reasonable accommodations refer to modifications or exemptions to particular policies that facilitate equal access to housing. Examples include exemptions to setbacks for wheelchair access structures or to height limits to permit elevators. The City of Cupertino adopted an ordinance in April 2010 for people with disabilities to make a reasonable accommodations request. Chapter 19.25 provides a procedure to request reasonable accommodation for persons with disabilities seeking equal access to housing under the Federal Fair Housing Act, the Federal Fair Housing Amendments Act of 1988, and the California Fair Employment and Housing Act. Zoning and Other Land Use Regulations In conformance to state law, licensed residential care facilities for six or fewer residents are permitted by right in all residential districts (including A, A-1, R-1, R-2, R-3, RHS, R-1C). Licensed small group homes are not subject to special development requirements, policies, or procedures which would impede such uses from locating in a residential district. Furthermore, small group homes (with six or fewer persons) with continuous 24-hour care are permitted by right in all residential districts, as are transitional and 587 B-95 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT supportive housing. Large group homes (with more than six residents) are conditionally permitted uses in the R-1 District, subject to Planning Commission approval. The Zoning Ordinance contains a broad definition of family. A family means an individual or group of persons living together who constitute a bona fide single housekeeping unit in a dwelling unit. Families are distinguished from groups occupying a hotel, lodging club, fraternity or sorority house, or institution of any kind. This definition of family does not limit the number of people living together in a household and does not require them to be related. Building Codes and Permitting The City’s Building Code does not include any amendments to the California Building Code that might diminish the ability to accommodate persons with disabilities. Below Market Rate Mitigation Program The City’s BMR Residential Mitigation Program requires all new residential developers to either provide below market rate units or pay a mitigation fee, which is placed in the City’s Below Market-Rate (BMR) Affordable Housing Fund (AHF). The BMR Mitigation Program is based on a nexus study prepared by the City that demonstrated that all new developments create a need for affordable housing. Under this program, developers of for-sale housing where units may be sold individually must sell at least 15 percent of units at a price affordable to median- and moderate-income households. Projects of seven or more units must provide on-site BMR units. Developers of projects of six units or fewer can either build a unit or provide pay the Housing Mitigation fee. To be consistent with recent court decisions and the State Costa-Hawkins Act regarding rent control, the City modified the BMR Mitigation Program so that developers of market- rate rental units, where the units cannot be sold individually, 588 B-96 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT pay the Housing Mitigation fee to the Affordable Housing Trust Fund. In 2014, the fee was $3.00 per square foot on residential. The BMR Office and Industrial Mitigation Program also acknowledges housing needs created by the development of office and industrial projects and provide fees to support the development of affordable housing. In 2014, the fee was $6.00 per square foot on office/industrial, hotel, and retail, and $3.00 per square foot in the Planned Industrial zone. 4 Although concerns exist that inclusionary housing programs like Cupertino’s BMR Mitigation Program may constrain production of market rate homes, studies have shown evidence to the contrary. The cost of an inclusionary housing requirement must ultimately be borne by either: 1) developers through a lower return, 2) landowners through decreased land values, or 3) other homeowners through higher market rate sale prices. In fact, the cost of inclusionary housing and any other development fee “will always be split between all players in the development process.”5 However, academics have pointed out that, over the long term, it is probable that landowners will bear most of the costs of inclusionary housing, not other homeowners or the developer. 6 In addition, a 2004 study on housing starts between 1981 and 2001 in communities throughout California with and without inclusionary housing programs evidences that inclusionary housing programs do not lead to a decline in housing production. In fact, the study found that housing production actually increased after passage of local inclusionary housing ordinances in cities as diverse as San 4 The housing mitigation fee is updated periodically. Developers should check with the Community Development Department for the most current fee amount. 5 W.A. Watkins. “Impact of Land Development Charges.” Land Economics 75(3). 1999. 6 Mallach, A.“Inclusionary Housing Programs: Policies and Practices.” New Brunswick, NJ: Center for Urban Policy Research, Rutgers University. 1984. Hagman, D. “Taking Care of One’s Own Through Inclusionary Zoning: Bootstrapping Low- and Moderate-Income Housing by Local Government,” Urban Law and Policy 5:169- 187. 1982. Ellickson, R. 1985. “Inclusionary Zoning: Who Pays?” Planning 51(8):18-20. 589 B-97 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Diego, Carlsbad, and Sacramento.7 Recognizing the need for a financially feasible program that does not constrain production, some jurisdictions allow developers to pay a fee for all units, regardless of project size. As discussed previously, Cupertino’s BMR Mitigation Program requires large for-sale developments (with seven or more units) to provide units. A 2009 courtcase (Palmer v. the City of Los Angeles) has resulted in cities suspending or amending the portion of their Housing Mitigation program requiring affordable units to be included in market rate rental developments. There also have been a number of court cases related to affordable housing requirements (decided and those that are still being litigated). Due to uncertainty regarding the legal standard applicable to affordable housing requirements, the Governor vetoed an Assembly Bill (AB 1229) which aimed to reverse the decision in the Palmer case. Currently pending in the California Supreme Court is a challenge to the City of San Jose’s inclusionary ordinance. The Building Industry Association asserts that all programs requiring affordable housing, whether for sale or for rent, must be justified by a nexus study showing that the affordable housing requirement is “reasonably related” to the impacts of the project on the need for affordable housing. In a previous California Supreme Court case, Sterling Park v. City of Palo Alto, the Court ruled that affordable housing requirements were a type of exaction that could be challenged under the protest provisions of the Mitigation Fee Act. The City of Cupertino has long justified its Housing Mitigation program as based on the impacts of market rate housing on the need for affordable housing and continues to require rental housing developments to pay a mitigation 7 David Rosen. “Inclusionary Housing and Its Impact on Housing and Land Markets.” NHC Affordable Housing Policy Review 1(3). 2004. 590 B-98 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT fee. However, the fee is based on an older nexus study. The City intends to update its nexus study on the BMR mitigation fees by the end of 2016 to determine appropriate housing mitigation fees (HE-Strategy 8). Park Impact Fees The City assesses park impact fees for new residential development. The fee ranges from $8,100 per unit of high density residential development (at 20 dwelling units per acre or more) and for apartments with ten or more units to $15,750 per single-family unit (where the density is 0 to 5 units per acre). Park impact fees for senior/elderly housing is $4,500 per unit. Cupertino’s park fees are comparable to or lower than similar requirements established in other Santa Clara County jurisdictions. Mountain View and San Jose require park land dedication or the payment of a park in-lieu fee. The in-lieu fee in both cities is based on fair market value of the land. San Jose’s park fees for single-family detached units ranged from approximately $15,000 to $38,550, depending on building square footage and the area of the city. Park fees for multi-family units in San Jose ranged from $7,650 to $35,600, depending on location and the size of the development. In Mountain View, park in-lieu fees are approximately $25,000 for each residential unit, depending on the value of the land. The City of Palo Alto’s park dedication requirements vary depending on whether the project involves a subdivision or parcel map, and also depending on the size of the unit. Palo Alto collects $10,638-$15,885 per single-family unit and $3,521-$6,963 per multi-family unit. Fees and Exactions Like cities throughout California, Cupertino collects development fees to recover the capital costs of providing community services and the administrative costs associated 591 B-99 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT with processing applications. New housing typically requires payment of school impact fees, sewer and water connection fees, building permit fees, wastewater treatment plant fees, and a variety of handling and service charges. Typical fees collected are outlined in Table 4.4. The total cost of permits, city fees, and other professional services fees (such as project-specific architecture and engineering designs and schematics) has been estimated to equate to 20 percent of construction costs, or approximately 10 percent of total project costs. The Bay Area Cost of Development Survey 2010-2011 conducted by the City of San Jose surveyed six jurisdictions in the region with sample development projects to determine associated entitlement, construction, and impact fees. For a multi-family development, total fees identified by this survey ranged from $4,841 per unit for the County of Santa Clara to $42,183 per unit for the City of Palo Alto. These fees have likely increased since the time of the survey, and therefore a conservative indication that Cupertino’s fees (estimated at $20,275 for a similar building type) are consistent with, and often less than, fees in surrounding jurisdictions. Permit Processing The entitlement process can impact housing production costs, with lengthy processing of development applications adding to financing costs, in particular. Planning Commission and City Council Approvals The Planning Commission and City Council review applications for zoning amendments and subdivision approvals. The Planning Commission holds a public hearing about proposed zoning changes or subdivisions and 592 B-100 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT TABLE 4.4: FEES AND EXACTIONS Fee Amount Single-Family (a) Townhouse (b)Multi-Family (c) Sanitary Connection Permit (d) $76 permit fee or $77.50 with backflow plus additional $300 inspection fee $376 $378 $378 Water Main Existing Facilities Fee (e) Fees based on construction costs with large variation depen- dent on fire safety requirements and size of water line. $7,000 $6,900 $2,300 Parcel Map (1-4 lots) - Planning Fee $7,461 N/A N/A N/A Tract Map (> 4 lots) - Planning Fee $15,974 $1,597 $1,597 N/A Residential Design Review/Architectural and Site Approval $2,400/$7,461 $2,400 $746 $149 Development Permit Fee $15,974 $1,597 $1,597 $319 Parcel Map (1-4 lots) - Engineering Fee $4,254 N/A N/A N/A Tract Map (> 4 lots) - Engineering Fee $8,831 $883 $883 N/A Engineering Plan Review Fee $736 $368 $124 Grading Permit Fee $750 $350 $601 Master Storm Drainage Area Fee Varies $906 $555 $378 Storm Management Plan Fee $715 $71.50 $71.50 $71.50 Park Impact Fee Varies by density $15,750 $9,000 $8,100 Housing Mitigation In-Lieu Fee $3.00 / Sq. Ft.$6,000 $4,800 $4,200 Cupertino Union School District Fee $2.02 / Sq. Ft.$4,040 $3,232 $2,828 Fremont Union High School District Fee $1.34 / Sq. Ft.$2,680 $2,144 $1,876 Plan Check and Inspection (Engineering)$655 $655 $655 $655 Building Permit Fee (f)Based on scope of project $7,409 $6,473 $2,121 Total $52,851 $39,750 $24,101 Notes: (a) Fees estimated for a 3,150 square foot, 3 bedroom home in a 10 unit subdivision with 7,000 sq. ft. lots over 2 acres. (b) Fees estimated for a 2,200 square foot, 3 bedroom/2.5 bathroom townhouse in a 10 unit subdivision over one acre. (c) Fees estimated for a 50 unit apartment development with 1,680 gross square foot (1,400 net), 2 bedroom apartment units over 2.2 acres (d) Average of fees charged in the four Cupertino Sanitary District zones. (e) Connectiom fee for San Jose Water, which serves the largest area of Cupertino. Cal Water and Cupertino Municipal also serve parts of the City. (f) Includes all fees payable to the Building Department. Includes Plan check and standard inspection fees, and Construction Tax. Sources: City of Cupertino, 2014; San Jose Water, 2014; Cupertino Sanitary District, 2014; MIG 2014 593 B-101 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT makes a recommendation to the City Council to approve, conditionally approve, or deny the application. Upon receipt of the Planning Commission’s recommendation, the City Council holds a public hearing before making a final decision on the proposed zoning change or subdivision. Local developers have noted that the entitlement process in Cupertino can be a time consuming and protracted process. While the active populous may add complexity to the entitlement process, Cupertino values public outreach and is committed to development of community leadership, local partnerships, an active populace and making government more accessible and visible to residents. Design Review Cupertino has not adopted citywide residential design guidelines. However, all Planned Development Zoning Districts, the R1 District, RHS District, the Heart of the City Specific Plan Area, and the North De Anza Boulevard Conceptual Plan Area are subject to design guidelines. These design guidelines pertain to features such as landscaping, building and roof forms, building entrances, colors, outdoor lighting, and building materials. The design guidelines are intended to ensure development is consistent with the existing neighborhood character and are generally not considered significant constraints to housing production. The Heart of the City Specific Plan design guidelines are intended to promote high-quality private-sector development, enhance property values, and ensure that both private investment and public activity continues to be attracted to the Stevens Creek Boulevard Special Area. Design guidelines promote retention and development viability of single-family residential sized lots in the transition area between Stevens Creek Boulevard fronting development and single-family neighborhoods. 594 B-102 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT The City requires design review for certain residential developments to ensure that new development and changes to existing developments comply with City development requirements and policies. These include: ƒƒVariances in the R-1 District ƒƒTwo-story residential developments in the R-1 District where second floor to first floor area ration is greater than 66 percent and/or where second story side yard setback(s) are less than 15 feet to a property line ƒƒTwo-story addition, new two-story home, and/or second story deck in the R1-a zone ƒƒAny new development or modifications in planned development residential or mixed-use residential zoning districts ƒƒSingle-family homes in a planned development residential zoning district ƒƒModifications to buildings in the R1C or R-2 zoning districts ƒƒSigns, landscaping, parking plans, and modifications to buildings in the R-3 zoning district The City has detailed Two-Story Design Principles incorporated in the R-1 District. These design principles help integrate new homes and additions to existing homes with existing neighborhoods by providing a framework for the review and approval process. Two-story homes with a second story to first floor ratio greater than 66 percent and homes with second story side setbacks less than 15 feet must offset building massing with designs that encompass higher quality architectural features and materials. Design Review may occur at the Staff or Design Review Committee level, depending on the scope of the project. 595 B-103 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Staff and the Design Review Committee, consisting of the Planning Commission Vice Chair and one other Planning Commissioner, consider factors such as building scale in relation to existing buildings, compliance with adopted height limits, setbacks, architectural and landscape design guidelines, and design harmony between new and existing buildings to determine design compliance. Processing Time Table 4.5 presents the typical permit processing time for various approvals in Cupertino. As shown, actions requiring ministerial review are usually approved within two to four weeks. Other approvals have longer processing time frames. Developments requiring multiple approvals involve joint applications and permits that are processed concurrently. All approvals for a particular project are reviewed in a single Planning Commission and/or City Council meeting. The typical permit processing times in Cupertino are similar to or lower than those in other TABLE 4.5: TYPICAL PERMIT PROCESSING TIME (a) Type of Approval Typical Processing Time Ministerial Review 2-4 weeks Two-Story Residential Permit 2-3 months Conditional Use Permit 2-4 months Zoning Change 4-6 months General Plan Amendment 4-6 months Architectural and Site Review 2-4 months Design Review 2-3 months Tentative or Parcel Map 2-4 months Initial Environmental Study 2 months Negative Declaration 3-6 months Environmental Impact Report 9-15 months Notes: (a) Processing time accounts for time involved in the preliminary consultation and/or conceptual review phase Applications for multiple approval types may be processed concurrently. Processing time would depend on time required to prepare environmental documents. Sources: City of Cupertino, 2014 596 B-104 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT jurisdictions and do not pose a major constraint to new development in the City. Cupertino is able to process applications in a timely manner because City staff works closely with applicants during a pre-application process. The pre-application is free of charge and its duration may vary depending on the completeness and/or the complexity of the project. Typical pre-application process may consist of the following: ƒƒInitial preliminary consultation with property owners/ developers to go over project objectives and City development standards ƒƒSubmittal and review of conceptual development plans ƒƒPreliminary consultations with relevant City departments (i.e., Fire, Building, Public Works) as deemed necessary ƒƒSubmittal and review of pre-submittal materials and final plans Table 4.6 summarizes the typical approvals required for various housing types. One-story single-family homes in properly zoned areas do not require approvals from the Community Development Department. However, two-story single-family homes require a two-story permit, which are approved by the Director of the Community Development Department and take two to three months to process. Residential subdivisions require a tentative parcel map or tentative subdivision map, depending on the number of units in the development, and take two to four months to receive approvals. Multi-family residential developments in R3 or Planned Development (PD) Districts are typically approved in two to four months. 597 B-105 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT TABLE 4.6: TYPICAL PROCESSING PROCEDURES BY PROJECT TYPE Typical Approvals Required Time Frame* Single-Family One-Story (No Planning Permit required)Building Permit 2-4 weeks One-Story (Minor Residential or Exception Permit required)Minor Residential Permit/ R1 Exception 1-2 months Two-Story Two-Story Permit 2-3 months Residential Hillside (no Exception)Building Permit 2-6 weeks Residential Hillside (with Exception)Hillside Exception 2-3 months Subdivision < 5 units Tentative Parcel Map 2-3 months ≥ 5 units Tentative Subdivision Map 3-4 months Multi-Family – R2, R3 No re-zoning Development Permit, Architectural Site Approval 2-3 months <5 parcels Tentative Parcel Map 2-3 months ≥5 parcels Tentative Subdivision Map 3-4 months Re-zoning Rezoning Application 4-6 months Development Permit, Architectural Site Approval Tentative or Parcel Map (depending on number of parcels) Multi-Family – PD No re-zoning Development Permit 3-4 monthsArchitectural Site Approval Tentative or Parcel Map Re-zoning Zoning change 4-6 monthsDevelopment Permit Architectural Site Approval Tentative or Parcel Map * May vary based on on level of Environmental Review required. 598 B-106 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Building Permit Standard plan check and building permit issuance for single-family dwellings in Cupertino takes approximately 10 business days. Plan checks for large additions, remodels, and major structural upgrades for single-family homes are also processed within 10 days. If a second review is necessary, the City will take approximately five business days to complete the review. Prior to the final building permit inspection for two-story additions and new two-story homes, applicants must submit a privacy protection plan, which illustrates how views into neighboring yards second story windows will be screened by new trees and/or shrubs. The plan check process may take longer for projects which entail off-site street improvements. Over-the-counter plan checks are available for small residential projects (250 square feet or less). Building Department staff typically review these projects in less than 30 minutes during normal business hours. In addition, an express plan check is offered for medium-sized residential projects (500 square feet or less) and takes approximately five days. Plan review can take from four weeks to several months for larger projects, depending on the size. Examples of this type of plan check include apartments and single-family residential subdivisions over 10 units. Cupertino’s building permit procedures are reasonable and comparable to those in other California communities. Tree Preservation The City of Cupertino has a Protected Tree Ordinance that is intended to preserve trees for their environmental, economic and aesthetic importance. The City seeks to retain as many trees as possible, consistent with the individual rights to develop, maintain, and enjoy their property. 599 B-107 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT The ordinance protects heritage trees, which are identified as significant for their historic value or unique characteristics, and certain trees that have a minimum single-trunk diameter of 10 inches or a minimum multi-truck diameter of 20 inches when measured at 4.5 feet from natural grade. These trees include native oak tree species, California Buckeye, Big Leaf Maple, Deodar Cedar, Blue Atlas Cedar, Bay Laurel or California Bay, and Western Sycamore trees. Trees protected by this ordinance may not be removed from private or public property without first obtaining a tree removal permit. Applications for tree removal permits are reviewed by the Community Development Director. The Director may approve, conditionally approve, or deny applications. In some cases, the City may require tree replacement as a condition of permit approval. Because a large share of residential development in Cupertino involves infill development involving demolition and replacement, building footprints are often already in place and tree preservation issues do not often arise as a major concern to developers. 4.2 Economic and Market Constraints In addition to governmental constraints, non-governmental factors may constrain the production of new housing. These could include economic and market related conditions such as land and construction costs. Availability of Financing While the housing market has rebounded since the recession that began in 2008, many developers still face difficulty securing project financing. In interviews completed as part of the Housing Element update process in 2013, it was stated that small developers in particular still have trouble, and some lenders do not understand how to finance mixed-use development. 600 B-108 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Project Funding In stakeholder interviews in late 2013, affordable housing developers and service providers discussed the hardships caused by the dissolution of the Redevelopment Agencies. This action eliminated a major source of funding for affordable housing, and that these funds have not yet been replaced by other tools. Federal and state funding sources (including Sections 202 and 811) have been eliminated or reduced so there is greater reliance on local sources. Land Availability and Costs Land costs in Cupertino are very high due to high demand and extremely limited supply of available land. Cupertino has seen a number of smaller detached infill housing projects where single-family homes are constructed on remnant lots or lots that have previously been developed with older homes. Multi-family development often requires lot consolidation and/or removing existing uses. A review of available real estate listings indicated one residentially zoned vacant property for sale as of May2014. This 0.22 acre property is zoned P(R-3) and had a listed price of $1,095,000. Based on this listing, an acre of residentially zoned land could be listed at close to $5 million. Construction Costs Construction costs vary significantly depending on building materials and quality of finishes. Parking structures for multi-family developments represent another major variable in the development cost. In general, below-grade parking raises costs significantly. Soft costs (architectural and other professional fees, land carrying costs, transaction costs, construction period interest, etc.) comprise an additional 10 to 40 percent of the construction and land costs. Owner-occupied multi-family units have higher soft costs than renter-occupied units due to the increased need for construction defect liability insurance. Permanent debt 601 B-109 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT financing, site preparation, off-site infrastructure, impact fees, and developer profit add to the total development cost of a project. Construction costs run about $100 per square foot for Type 5 construction (wood and stucco over parking) for multi-family units and $110 per square foot for single family units8. Residential developers indicate that construction costs in the Bay Area may far exceed these national averages, and can reach $200 per square foot for larger (four- to six-story) developments. Key construction costs have risen nationally in conjunction with economic recovery and associated gains in the residential real estate market. Figure B-6 illustrates construction cost trends for key materials based on the Producer Price Index, a series of indices published by the U.S. Department of Labor Bureau of Labor Statistics that measures the sales price for specific commodities and products. Both steel and lumber prices have risen sharply since 2009, as have finished construction products. 4.3. Environmental, Infrastructure & Public Service Constraints Environmental Constraints The majority of Cupertino land area has been urbanized and now supports roadways, structures, other impervious surfaces, areas of turf, and ornamental landscaping. In general, urbanized areas tend to have low to poor wildlife habitat value due to replacement of natural communities, fragmentation of remaining open space areas and parks, and intensive human disturbance. There are no significant wetland or environmental resource issues of concern that would constrain development in areas designated for residential development in Cupertino. 8 International Code Council Building Valuation Data for Type V construction, February 2014 602 B-110 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Producer Price Index: Steel and Lumber 100 120 140 160 180 200 220 240 2004200520062007200820092010201120122013 Year P r o d u c e r P r i c e A x i s Steel Lumber Figure B-5 Producer Price Index for Key Construction Costs Source: U.S. Department of Labor, Bureau of Labor Statistics, 2014; MIG, 2014 Pr o d u c e P r i c e I n d e x Producer Price Index: Steel and Lumber 100 120 140 160 180 200 220 240 2004200520062007200820092010201120122013 Year P r o d u c e r P r i c e A x i s Steel Lumber Pr o d u c e P r i c e I n d e x 603 B-111 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Roads Due to the urbanized nature of Cupertino, existing roads are in place to serve the potential infill residential development identified in this Housing Element. The amount of traffic or congestion on a roadway is measured in terms of Level of Service (LOS) ranging from A to F, with A representing intersections that experience little or no congestion and F representing intersections with long and unacceptable delays. Cupertino has established a policy of maintaining a minimum of LOS D for major intersections during the morning and afternoon peak traffic hours, with some exceptions. The LOS standard for the Stevens Creek and De Anza Boulevard intersection, the Stevens Creek and Stelling Road intersection, and the De Anza Boulevard and Bollinger Road intersection is LOS E+. The environmental assessment of individual residential projects considers any associated traffic impacts. If the study finds that the project could cause an intersection to deteriorate, mitigation may be required. This usually consists of improvements to adjacent roads and intersections, but may also include changes to the number of units in the project, or to site design and layout. However, SB 743, signed into law in 2013, started a process that could fundamentally change transportation impact analysis as part of CEQA compliance. These changes will include the elimination of auto delay, level of service (LOS), and other similar measures of vehicular capacity or traffic congestion as a basis for determining significant impacts in many parts of California (if not statewide). As such, potential costs to new development associated with roadway mitigation may be reduced or eliminated. Water Two water suppliers provide service to the City: the 604 B-112 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT California Water Company and the San Jose Water Company. The San Jose Water Company also has a lease agreement to operate and maintain the City of Cupertino’s water system until 2022. Both of these providers derive the vast majority of their water from the Santa Clara Valley Water District. According to the 2014 General Plan Amendment and Housing Element EIR, California Water Company and San Jose Water Company have sufficient water supplies to accommodate increased growth associated with the GPA and Housing Element under normal, single dry, or multiple dry years. Future development associated with the Housing Element would be located within already developed urban areas and would therefore connect to an existing water distribution system. No new water treatment facilities or the expansion of existing facilities would be required to accommodate the RHNA. Wastewater Cupertino Sanitary District (CSD) serves as the main provider of wastewater collection and treatment services for Cupertino, while the City of Sunnyvale serves a small portion of the Cupertino Urban Service area on the east side of the city. The City of Sunnyvale Wastewater Treatment Plant has a daily treatment capacity of 29 mgd capacity, of which approximately 15 mgd are being utilized in 2014. The CSD has a contractual treatment allocation with the San Jose/Santa Clara Water Pollution Control Plant of 7.85 million gallon per day (mgd), on average. Current wastewater flow to San Jose/Santa Clara Water Pollution Control Plant is 5.3 mgd. The CSD prepared a flow capacity analysis in 2008 and determined that 0.6 mgd capacity remained for development beyond that previously allocated and planned for under the General Plan. The 2014 General Plan Amendment and Housing Element EIR identifies this as a significant and unavoidable impact, as 605 B-113 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT the combined 2014 project would generate an estimated 1.45 mgd of wastewater flows upon buildout, resulting in a deficit of 0.85 mgd beyond the current contractually available treatment capacity. However, both the SJ/ SCWPCP and City of Sunnyvale treatment plants have excess capacity that could potentially treat new wastewater flows associated with development pursuant to Housing Element policy. With regard to sewer capacity, some capacity deficiencies exist in certain areas of Cupertino, including sewer lines serving the City Center area and lines on Stelling Road and Foothill Boulevard. To accommodate wastewater from major new developments, the lines running at or new capacity in these areas will have to be upgraded. Under current practice, the CSD requires developers of substantial projects to demonstrate that adequate capacity exists, or to identify and fund the necessary mitigations. CSD is, as of 2014, performing a capacity analysis of their entire collection system. Improvements required to mitigate system deficiencies as well as to accommodate future development will be identified and added to their Capital Improvement Program (CIP). Capacity fees will then be developed to fund the CIP. New development that increases wastewater transmission and treatment demand would be required to contribute towards system capacity enhancement improvements through payment of the capacity fee. In this manner, CSD would be responsible for upgrading their system rather than placing the responsibility on the developers of the largest wastewater generators, as is currently the case. If and when this fee is developed and implemented, it will create a more reliable and equitable mitigation for new development. Storm Drainage Cupertino’s storm drain system consists of underground 606 B-114 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT pipelines that carry surface runoff from streets to prevent flooding. Runoff enters the system at catch basins found along curbs near street intersections and is discharged into City creeks. The capacity of the storm drain facilities within Cupertino was evaluated and documented in the 1993 Storm Drain Master Plan, which identifies the areas within the system that do not have the capacity to handle runoff during the 10-year storm event, which is the City’s design standard. The City requires that all new developments conform to this standard. Open Space Cupertino’s General Plan outlines a policy of having parkland equal to three acres for every 1,000 residents. Currently, Cupertino has approximately 162 acres of parkland. Future development in Cupertino would increase the need for new park land. The General Plan identified an additional 49 acres of potential neighborhood and community parks, which would be more than enough to maintain the standard of three acres for every 1,000 residents. In addition, Cupertino’s park impact fees of $8,100 to $15,750 per unit would generate funding for the City to purchase new parkland and maintain existing recreational resources. Community Acceptance Other constraints to housing production in the City include community acceptance, specifically concerns about impacts on the school districts, traffic, and parks. In particular, neighbors have indicated resistance to the development of buildings taller than two stories. Density and height are more acceptable if buildings are well designed and along corridors or adjacent to higher-density development. In 2013 interviews, many stakeholders indicated that multi- family projects tend to generate community opposition and that there is some general fear of growth and increased 607 B-115 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT density in the City. Opposition from the community tends to increase with the size and height of the project, as well as the proximity to existing single-family neighborhoods. To facilitate residential development and meet the RHNA for this fifth cycle update, the City conducted an extensive community outreach process to identify appropriate and feasible sites for residential and mixed use development over the next eight years. One of the objectives of this process is to address community concerns. Schools Cupertino Union School District (CUSD) and Fremont Union High School District (FUHSD) are among the best in the state. In addition, a portion of the City, in the northeast corner, is also served by the Santa Clara Unified School District. Residents are particularly concerned about the impacts of new housing on schools. However, State law (Government Code Section 65995[3][h]) provides that payment of school impact fees fully mitigates impacts, and as such, the City’s ability to require additional mitigation is limited by State law. CUSD is a rapidly growing school district. Enrollment has increased every year during the last decade, increasing from 15,575 in the fall of 2001 to 19,058 in the fall of 2013. CUSD serves students from Cupertino and parts of San Jose, Sunnyvale, Saratoga, Santa Clara, and Los Altos at 20 elementary schools and five middle schools. Approximately 44 percent of CUSD’s students reside in Cupertino. In total, 3,325 CUSD students (17 percent of total enrollment) attend schools other than the school of their attendance area. FUHSD served 10,657 students from Cupertino, most of Sunnyvale and parts of San Jose, Los Altos, Saratoga, and Santa Clara. The Santa Clara District is a medium size district; as a unified district its 15,394 students are spread from kindergarten through high school. 608 B-116 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Operating Costs and Finances Most of CUSD revenues are tied to the size of enrollment. The State Department of Education guarantees CUSD a certain level of operations funding known as the “revenue limit.” The Revenue Limit is established annually by the State based on the District’s average daily attendance (ADA). The revenue limit is composed of State funding and local property tax revenues. If the District’s property tax revenufalls below the revenue limit in any given year, the state will increase its contribution to make up the difference. CUSD therefore relies on gradual, steady increases in enrollment to maintain its financial health over time. Because the revenue limit makes up the majority of CUSD revenues, and this limit is tied directly to enrollment, the District needs predictable, ongoing student growth to keep up with costs. Declines in enrollment would require the District to cut costs. The 2013-2014 school year operating budget was $155.6 million. With the total of 19,053 enrolled students districtwide, the operating cost per student for the school year was approximately $8,167. In contrast, FUHSD relies on property taxes for most of its revenue. FUHSD receives property taxes in excess of its revenue limit. FUHSD keeps these additional revenues for operations. As a result, the state does not provide annual per-ADA funding. Therefore, FUHSD counts on a growing property tax base to keep up with costs and maintain per-student funding. New development helps promote a healthy tax base over time. Multi-family development can be particularly beneficial to the tax base, generating higher revenues per acre than single-family homes. This translates into more revenue for FUHSD. The FUHSD’s operating budget for the school year 2013-2014 was $115 million. With the total of 10,657 students enrolled, operating cost 609 B-117 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT per student was approximately $10,800. Moreover, property taxes from new multi-family housing can exceed the cost to FUHSD to serve students. Table 4.8 illustrates this point, using previously built projects as examples. Nonetheless, FUHSD stresses that the impacts of new residential development should be evaluated on a case-by-case basis to mitigate any undue effects on the District. Enrollment and Facilities Each of the local school districts expects to continue growing over the next 10 years. CUSD and FUSD project TABLE 4.7: COMPARISON OF FUHSD PROPERTY TAX REVENUE PER ACRE Multi-family HousingSingle-family housing Value per Unit (a) $822,500 $1,550,000 Density (Units/Acre)20 5 Total Value/Acre $16,450,000 $7,750,000 Property Taxes to FUHSD per Acre (b)$27,965 $13,175 Notes: (a) Median sales prices from July 2013 to June 2014 (b) FUHSD receives approximately 17% of 1% of assessed value. Source: School House Services, 2014. 610 B-118 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT that a total of 1,321 new housing units would be built in Cupertino in the years 2014 through 2023, and expects enrollment to grow accordingly. It is important to note that this growth comes from the other cities that the districts serve, in addition to Cupertino. Cupertino-based students comprise about 60 percent of enrollment in each district. In addition to this housing growth, the recent surge in enrollment at CUSD has been primarily in the younger grades and these larger classes are now entering middle school. Accordingly, by 2020 high school enrollment at FUSD is projected to increase by over 1,000 students. SCUSD anticipates a 13 percent increase in enrollment by 2023. TABLE 4.8: FINANCIAL IMPACTS OF CUPERTINO DEVELOPMENTS ON FREMONT UNION HIGH SCHOOL DISTRICT MontebelloCity Center TravigneMetropolitanCivic Park FUHSD REVENUE Assessed Value of Dev’t $ 113,486,674$ 38,480,698$ 25,106,837 $ 65,788,586$ 116,329,797 Property Tax Revenue (a)$ 252,958$ 85,745$ 57,086$ 145,477$ 258,480 FUHSD COSTS Number of Students in Dev’t 7 17 2 6 13 Cost to Serve Students (b)$ 75,600$ 183,60$ 21,600$ 64,800$ 140,400 NET SURPLUS/(DEFICIT)$ 177,358($ 97,855)$ 34,486$ 80,677$ 118,080 Notes: (a) Percentage of base 1.0 percent property tax FUHSD receives (after ERAF shift) in TRA 13-003: 17% (b) FUHSD Operating Cost per Student, FY 13-14: $10,800 Sources: Santa Clara County Assessor, Enrolment Projections Consultants, School House Services, 2014. 611 B-119 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT The districts will continue to use their facilities efficiently to accommodate projected growth. CUSD and FUHSD report that their ability to absorb new students is not unlimited, and rapid growth does pose a challenge. However, they will strive to make space and maintain student-teacher ratios through creative solutions such as relocating special programs, adjusting schedules, selectively using modular classrooms, and other approaches. In addition, FUHSD is developing a plan to dedicate the $198 million raised from Measure B (authorized in 2008) for facility improvements. These include athletic facilities, solar power, IT systems, infrastructure, classrooms, labs, and lecture halls. The districts also augment their facilities using impact fees from new development. CUSD receives $2.02 per square foot in fees from residential development. FUHSD receives $1.34 per square foot from new residential development. In addition to the development impact fee, voters have approved multiple bond measures for school facility improvements. The districts can also address impacts on 19,346 11,654 0 5,000 10,000 15,000 20,000 25,000 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 CUSD FUSD Figure B-6 Enrollment Projections, 2008-2013, CUSD and FUHSD 612 B-120 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT a case-by-case basis, establishing partnerships with home builders to construct new facilities or expand existing schools. Higher-density housing generally generates fewer students per unit. Table 4.9 illustrates this trend among recently-built projects in Cupertino. On average, the school districts report that new single-family homes and townhouses generate 0.8 K-12 students per unit, while new multi-family homes generate 0.3 K-12 students per unit. In addition, most enrollment growth comes from existing homes that are either sold or rented to families with children, not new development. Nonetheless, the districts indicate that new housing will contribute to future demand for classroom space, which the districts must address through the strategies outlined above. A comprehensive analysis of school impacts was completed as part of the 2014 General Plan Amendment and 2015- 2023 Housing Element drafting. Four alternatives were analyzed, consistent with the Environmental Impact Report for the combined project. The existing General Plan and Alternative A would result in the same level of residential development. Alternatives B and C change the General Plan designation and zoning for some sites to make more TABLE 4.9: STUDENT GENERATION IN CUPERTINO DEVELOPMENTS Higher Density Lower Density MontebelloTravigneMetropolitanCivic Park Density (Units/Acre)96 24 30 31 Students/Unit CUSD (a)0.22 0.26 0.29 0.33 FHUSD (a)0.03 0.04 0.06 0.10 Total 0.25 0.30 0.35 0.43 Notes: (a) Student enrollment data as of October 2013, provided by Enrolment Projection Consultants. Sources: City of Cupertino; EPC 2014. 613 B-121 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT units possible. The analysis presented here pertains to the portion of residential development estimated to take place between 2015 and 2023 under each growth scenario, to be consistent with the Housing Element time period. [This section to be updated subsequent to City Council decision on General Plan Alternatives.] The projections in Table 4.10 are based on the rates of generation of apartments built since 1995 in Cupertino, which have a relatively small number of middle and high school students in them. The largest numbers of potential units and students are in the Garden Gate and Collins elementary school attendance areas, in the Lawson Middle School area, and in the Cupertino and Monta Vista High School areas. Collins and Garden Gate Elementary Schools and Cupertino High are, or will be, among the schools with the greatest enrollment stress. The projected student enrollment from new units is a small fraction of the projected student enrollment from the existing units in the City. Capital costs to add capacity related to rising enrollment are significant, and development impact fees from residential development only cover a quarter of this cost. TABLE 4.10: ESTIMATED STUDENT ENROLLMENT FROM NEW UNITS, 2015-2023 Existing Conditions Minimal Growth A Moderate Growth B Most Growth C By 2023 Number of Units Expected 1,140 1,140 1,060 1,993 CUSD Students Expected 365 365 339 638 FUHSD Students Expected 80 80 74 140 Total Students*445 445 413 778 * SCUSD enrollment impacts are relatively small, possibly either positive or negative. 614 B-122 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Table 4.11 indicates the estimated cost deficits related to needed capital improvements associated with increases in enrollment. This analysis does not include impact fee revenue from non-residential development; as such cost deficits may be somewhat overstated. [This section to be updated subsequent to City Council decision on General Plan Alternatives.] 4.4. Opportunities for Energy Conservation Maximizing energy efficiency and incorporating energy conservation and green building features can contribute to reduced housing costs for homeowners and renters. In addition, these efforts promote sustainable community design and reduced dependence on vehicles, and can significantly contribute to reducing greenhouse gas emissions. In addition to compliance with state regulations, the Environmental Resources/Sustainability, Land Use, and Circulation Elements of the Cupertino General Plan includes policies related to energy conservation and efficiency. In particular, the Land Use Element provides for higher-density housing in proximity to employment centers and transportation corridors and includes mixed use development where appropriate. In addition, the City is undertaking an effort to prepare a Climate Action Plan (CAP) by modifying the Regional Climate Action Plan to suit the City’s needs in order to reduce greenhouse gas TABLE 4.11: ESTIMATED CAPITAL FACILITIES NET IMPACTS (IN $ MILLIONS) Existing Conditions Minimal Growth A Moderate Growth B Most Growth C By 2023 CUSD Net Capital Facilities Cost Deficit $8.76 $8.76 $8.13 $15.31 FUHSD Net Capital Facilities Cost Deficit $4.02 $4.02 $3.71 $7.03 * SCUSD receives large capital facilities and operating revenue benefits if development is significant. 615 B-123 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT emissions. The CAP will meet the regulatory requirements of the California Global Warming Solutions Act, commonly known as AB 32. The Plan will include community-vetted measures to reduce greenhouse gas (GHG) emissions in the region and locally to foster a healthy and resilient Cupertino. Through extensive research and community input, the CAP will meet statewide emission mitigation targets and identify opportunities to reduce emissions that impact the local environment. The City adopted a Green Building Ordinance in 2012. The ordinance aligns with the California Green Building Standards Code (CALGreen) which sets the threshold of building codes at a higher level by requiring development projects to incorporate green building practices. Cal Green requires every new building built after January 1, 2011 to meet a certain baseline of efficiency and sustainability standards. The ordinance aims to promote green practices (e.g., water, energy and resource conservation) through the design, construction and maintenance of new buildings and existing buildings undergoing major renovations. The City’s Green Building Ordinance applies to all new residential and non-residential buildings and structures, additions, renovations, and tenant improvements where CalGreen and minimum green building measures are applicable. For residential development the ordinance differentiates between smaller projects of nine or less units and large projects with more than nine units. The Ordinance requires larger development projects to earn certification per the Leadership in Energy and Environmental Design (LEED) or Green Point Rating (GPR) standards. Smaller developments must meet Cal Green’s minimum thresholds as established by the state. Utility providers serving Cupertino also encourage energy and water conservation. The Santa Clara Valley Water District offers rebate programs that can help residents and 616 B-124 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT businesses save both water and energy. Examples include rebates for high-efficiency toilets and clothes waters, converting high-water using landscape to low water using landscape, and connecting a clothes washer to a graywater irrigation system. Pacific Gas and Electric Company (PG&E) offers energy efficiency rebates to property owners and managers of multifamily dwellings that contain two or more units. The program encourages owners of existing properties to upgrade to qualifying energy-efficient products in individual tenant units and in the common areas of residential apartment buildings, mobile home parks and condominium complexes. The Housing Element contains policies and strategies to promote energy conservation. For example, the City will evaluate the potential to provide incentives, such as waiving or reducing fees, for energy conservation improvements at affordable housing projects (including both existing and new developments that have fewer than ten units) to exceed the minimum requirements of the California Green Building Code. 4.5. Summary ƒƒCupertino’s General Plan and Zoning Ordinance are not development constraints to new housing production. The Land Use/Community Design Element of the General Plan identifies four categories of residential use and four mixed use categories, while the Zoning Ordinance permits residential development in seven districts, plus planned development districts. ƒƒThe Zoning Ordinance allows rotating and permanent homeless shelters in the BQ Zone in compliance with State law. ƒƒThe Zoning Ordinance permits employee housing for workers and their families in residentially zoned districts. 617 B-125 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT ƒƒSite improvement, building code requirements, and permit processing time in Cupertino are comparable to surrounding communities and are not a development constraint. ƒƒDevelopment fees in Cupertino are comparable to those in neighboring jurisdictions. ƒƒThe lack of state and local funding sources for affordable housing and limited access to financing, in conjunction with the high cost and low supply of land, may constrain housing development in the near term. ƒƒA potential constraint to housing development is road capacity. Residential projects may be required to undertake mitigation measures if developments result in traffic impacts. ƒƒThe stormwater drainage, water distribution, and water supply systems are adequate to accommodate anticipated growth in Cupertino and are not considered constraints to development. Wastewater treatment is reaching capacity in the area; however, existing plants have some excess capacity to treat new wastewater flows associated with development pursuant to Housing Element policy. Some sewer line capacity deficiencies also exist in certain areas of Cupertino—the Cupertino Sanitary District is in the process of assessing deficiencies and developing capacity fees intended to fund necessary improvements. ƒƒCapacity and fiscal impacts to the Cupertino Union School District, Fremont Union High School District and the Santa Clara Unified School District must be evaluated on a case-by-case basis. State law provides that payment of school impact fees fully mitigates impacts, and as such, the City’s ability to require additional mitigation is limited by State law. ƒƒCommunity acceptance may serve as a constraint to 618 B-126 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT housing development. Over the past several years, multi-family projects have been successfully opposed by residents. 5. HOUSING RESOURCES 5.1. Overview of Available Sites for Housing The purpose of the adequate sites analysis is to demonstrate that the City of Cupertino has a sufficient supply of land to accommodate its fair share of the region’s housing needs during the RHNA projections period (January 1, 2014 – October 31, 2022). The Government Code requires that the Housing Element include an “inventory of land suitable for residential development, including vacant sites and sites having the potential for redevelopment” (Section 65583(a)(3)). It further requires that the element analyze zoning and infrastructure on these sites to ensure housing development is feasible during the planning period. Demonstrating an adequate land supply, however, is only part of the task. The City must also show that this supply is capable of accommodating housing demand from all economic segments of the community. High land costs in the Bay Area make it difficult to meet the demand for affordable housing on sites that are zoned at relatively low densities. Pursuant to Government Code Section 65583.2(c) (3)(B), local governments may utilize “default” density standards (e.g. the “Mullen Densities”) to provide evidence that “appropriate zoning” is in place to accommodate the development of housing for very-low and low-income households . The purpose of this law is to provide a numerical density standard for local governments, resulting in greater certainty in the housing element review process. Specifically, if a local government has adopted density standards that comply with the criteria provided in the law, 619 B-127 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT no further analysis is required to establish the adequacy of the density standard. The default density standard for Cupertino and other suburban jurisdictions in Santa Clara County to demonstrate adequate capacity for low and very low income units is 20 dwelling units per acre or more. 5.2. Progress towards the Regional Housing Needs Allocation (RHNA) California General Plan law requires each city and county to have land zoned to accommodate its fair share of the regional housing need. Pursuant to California Government Code Section 65584, the state, regional councils of government (in this case, ABAG) and local governments must collectively determine each locality’s share of regional housing need. The major goal of the RHNA is to assure a fair distribution of housing among cities and counties in the State so that every community provides for a mix of housing for all economic segments. The housing allocation targets are not building requirements; rather, they are planning goals for each community to accommodate through appropriate planning policies and land use regulations. Allocation targets are intended to assure that adequate sites and zoning are made available to address anticipated housing demand during the planning period. The RHNA for the ABAG region was adopted in July 2013. This RHNA covers an 8.8-year projection period (January 1, 2014 through October 31, 2022)9 and is divided into four income categories: very low, low, moderate, and above moderate. As determined by ABAG, the City of Cupertino’s fair share allocation is 1,064 new housing units during this planning cycle, with the units divided among the four income categories as shown in Table 5.1. Since 9 The Housing Element planning period differs from the RHNA projection period—the period for which housing demand was calculated. The Housing Element covers the planning period of January 31, 2015 through January 31, 2023. 620 B-128 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT the RHNA uses January 1, 2014 as the baseline for growth projections for the 2014-2022 planning period, jurisdictions may count toward the RHNA housing units developed, under construction, or approved since January 1, 2014. Between January 1, and May 31, 2014, building permits for 14 single-family housing units and three second units were approved in Cupertino. In addition, six single-family homes and seven apartments received Planning approvals (Table 5.1). Also included in the RHNA credits are 32 second units projected to be developed within the planning period. As provided in Government Code Section 65583(c)(1)), in addition to identifying vacant or underutilized land resources, the City can address a portion of the RHNA through an estimate of the number of second units that may be permitted during the planning period. The City approves an average of four second units per year. Considering this track record, the City estimates that 32 second units will be approved over eight-year planning period. Cupertino’s Zoning Ordinance permits second dwelling units on lots in Single-Family Residential (R-1), Residential Hillside (RHS), Agricultural (A), and Agricultural Residential (A-1) Districts. Permit approval and architectural review are done at the ministerial (building permit) level. Consistent with Government Code Section 65583(c)(1)) and HCD technical guidance documents, the City is applying the second unit estimate towards its moderate income RHNA. HCD has indicated that second-unit affordability can be determined by examining market rates for reasonably comparable rental properties and applying these rates to estimate the anticipated affordability of second units. A review of rental market conditions in Cupertino conducted for this Housing Element found that the average cost of a studio apartment is $1,608 and the average cost of a one- bedroom apartment is $2,237. These rental rates are in the 621 B-129 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT range of moderate income rents as determined by HUD (see Table 2.15: Maximum Affordable Housing Costs, Santa Clara County, 2013). As these units are comparable in size and occupancy to second units, it is reasonable to assume that current rents for second units fall within affordability levels for one-person moderate-income households. Therefore, second units in the pipeline and the anticipated 32 second units are credited against the moderate income RHNA. Recent research in the San Francisco Bay Area suggest that that a sizable fraction of secondary units are rented to acquaintances, friends or family, in some cases for free and in other cases, for reduced rents10. This research suggests that second units may in fact be a source of affordable housing in the City at affordability levels lower than the moderate-income level they are credited against. Applying the projected 32 second units towards the moderate income category is a conservative approach, and is consistent with State law and HCD technical guidance documents. With these credits, the City has a remaining RHNA of 1,002 units: 356 extremely low/very low-income units, 207 low- income units, 196 moderate-income units, and 243 above moderate-income units. 10 Chapple, Karen and Jake Wegmann. Understanding the Market for Secondary Units in the East Bay. UC Berkeley: Institute of Urban and Regional Developmental. Oct 2012. 622 B-130 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT TABLE 5.1: REMAINING RHNA, CUPERTINO, 2014-2022 Units Constructed/Under Construction/Permits Issued Extremely and Very Low Income (0-50% AMI) Low Income (51-80% AMI) Moderate Income (81- 120% AMI) Above Moderate Income (121%+ AMI) Total Various Single-Family Units (Building Permits)---------14 14 Various Single-Family Units (Planning Permits)---------6 6 Multi-Family Units (Planning Permits)---------7 7 Second Units Permitted (Building Permits)------3*---3 Estimated Second Unit Production ------32*---32 Total ------35 27 62 2014-2022 RHNA 356 207 231 2701,064 RHNA Credits ------35 27 62 Remaining 2014-2022 RHNA356 207 196 2431,002 Source: ABAG Regional Housing Needs Allocation, 2014; City of Cupertino, 2014 Notes: *These units do not have affordability restrictions. Market rate rents and sale prices for similar units fall within levels affordable to the households earning moderate incomes (81-120% AMI) and are allocated as such. 623 B-131 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT 5.3. General Plan Residential Allocations Cupertino faces regional growth demands. It is also undergoing a transformation from a traditional suburban residential community to one that has more public gathering spaces, shopping and entertainment choices, and jobs within an urban core. How the City allocates growth through the General Plan is critical in determining the type of community Cupertino will be in the future. Cupertino historically has more jobs than housing. When this imbalance is multiplied across other adjacent cities, regional consequences include high housing costs, sprawl into outlying areas, congestion of the transportation system, and increased air pollution. The General Plan’s development allocation policies improve the jobs/housing balance by increasing potential housing units and decreasing non-residential square footage. The current 2005 General Plan controls the amount of commercial, office, hotel, and residential built in the city through development allocations in terms of square feet (commercial and office), rooms (hotel), and units (residential). This allocation was updated in 2014 as part of a comprehensive process that sought to replenish, re-allocate, and increase citywide office, commercial, hotel, and residential allocations in order to plan for anticipated future development activity while keeping with the community’s character, goals, and objectives. 5.4. Residential Capacity Analysis Methodology Like many cities in the Bay Area, Cupertino is largely built out. As a result, opportunities for residential units will be realized through the redevelopment of sites with existing buildings. City staff undertook a deliberate site selection process to ensure that future residential development on 624 B-132 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT the sites would: 1) have community support (see description of community process below), 2) achieve community goals of affordability and walkability, and 3) create a livable environment for new residents and neighbors. To ensure this, sites were selected based on the following criteria: • Proximity to transportation corridors • Proximity (preferably within walking distance) to amenities such as schools, neighborhood services, restaurants and retail • Ability to provide smaller, more affordable units; sites were selected in higher density areas to achieve this • Create a livable community with the least impact on neighborhoods; sites that had the most in common with successfully developed sites were selected • Corner lot location; such parcels provide the most flexibility to accommodate mixed- use developments and avoid impeding parking and connectivity between mid- block parcels In addition to the state-wide criteria that HCD uses to determine site suitability, the Sustainable Communities Strategy/One Bay Area Plan contributed additional criteria regarding what makes a desirable housing site in the ABAG region. The One Bay Area Plan is a long-range integrated transportation and land-use/housing strategy through 2040 for the San Francisco Bay Area. The plan focuses development in Priority Development Areas (PDA) which are locally designated areas within existing communities that have been identified and approved by local cities or counties for future growth. These areas are typically accessible to public transit, jobs, recreation, shopping and other services, and absorb much of the growth anticipated in the region. In Cupertino, a PDA is located along Stevens Creek Boulevard between Highway 85 and the City of Santa 625 B-133 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Clara and along De Anza Boulevard between Stevens Creek Boulevard and Highway 280. Key criteria in the Sustainable Communities Strategy/One Bay Area Plan include: • Location along major transportation routes with access to transit or within ½ mile of a Valley Transit Authority- designate PDA • Proximity to employment and activity centers • Proximity to amenities With the selection criteria in mind, City staff conducted a thorough study evaluating underutilized land in Cupertino. These parcels included residentially zoned land as well as other designations such as commercial and mixed use. Community Involvement To ensure that both community members and property owners support of the Housing Element—and sites inventory in particular—City staff engaged in an in-depth community involvement process. The inventory of residential opportunity sites was developed in consultation with the Housing Commission, Planning Commission, City Council, and members of the public. The Housing Element and sites inventory was presented at a Planning Commission and Housing Commission joint workshop, a Housing Commission workshop, a Planning Commission Open House and Study Session, and a City Council Study Session. At each meeting, commissioners and council members, as well as members of the public, discussed the inventory. During these discussions, several sites were removed and new sites were added based on input from these various stakeholders. Decisions to add or remove sites were based on realistic expectations for sites to be redeveloped within the planning period. In addition to consultation with various community 626 B-134 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT stakeholders, City staff reached out to individual owners whose properties were identified as housing opportunity sites. Each affected owner received a letter informing them that their property had been identified by the City to be included in its Housing Element as a housing opportunity site. The letter provided information about the process and the opportunity to provide feedback or express concerns. Many property owners contacted staff to discuss inclusions, but a few objected to the inclusion of their property in the sites inventory. Staff also received request from property owners to be included in the site inventory. The sites with property owner development interest were evaluated against the criteria described above. Sites that did not meet the criteria were not included in the inventory. Sites where the owner objected to inclusion were not included in the final inventory. While residential development may occur on other sites not included in this inventory, the sites ultimately included in this Housing Element are those the community believes have the most realistic chance of redeveloping into housing within the planning period. As a result of the community engagement process, the sites inventory represents a list of residential opportunity sites that the community has thoroughly reviewed and supports. 627 B-135 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Determination of Realistic Capacity Sites inventory capacity must account for development standards such as building height restrictions, minimum setbacks, and maximum lot coverage, as well as the potential for non-residential uses in mixed-use areas. A survey of recent developments (Table 5.2) indicates that recent multi-family residential projects have built to between 82 percent and 99.5 percent of the maximum allowable density. To ensure that the sites inventory provides a “realistic capacity” for each site, estimates for maximum developable units on each site are conservatively reduced by 15 percent. TABLE 5.2 MIXED USE/MULTI FAMILY RESIDENTIAL PROJECT EXAMPLES Project Name:Rose Bowl Mixed Use Biltmore Adjacency Oak Park Adobe Terrace Metropolitan Site Area (acres)5.9 3.24 1.6 1.0 3.3 Max. Density (dwelling units per acre)35 25 35 25 35 Max. Developable Units 205 81 56 25 116 Actual Units Developed 204 74 46 23 107 Actual/Max. Units 99.5%91.3%82%92%92% Commercial Sq. Ft. as % of Total Sq. ft.37%2%NA 8%4% Source: City of Cupertino, 2014 628 B-136 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Because of the desirability and high value of residential property in Cupertino, developers are reluctant to include ground floor commercial space in residential buildings, even when land is zoned for mixed-use development. The City must often encourage or request that ground-floor commercial space be included in projects and commercial space typically represents a small proportion of the total development. Staff anticipates that this trend will continue, and land zoned for mixed-use will achieve residential densities at or above 85 percent of the maximum with ground floor commercial space along the street frontage. This trend is evident in the three mixed-use project examples that contained ground floor commercial development. The Biltmore Adjacency, Metropolitan and Adobe Terraces projects are typical mixed-use, multi- family developments in Cupertino. In both cases, the commercial component represented a small portion of the total square footage (between 2 and 8 percent). Even with the provision of ground floor commercial space, these developments were able to achieve 91 to 92 percent of the maximum allowable residential units. The height limit of developments in most of the major transportation corridors is 45 feet at the minimum. Based on the development experiences at the completed projects described above, the density assumptions for mixed-use residential projects at 85 percent of the maximum allowed is realistic. The assumption that sites will achieve 85 percent of the maximum allowable density is also realistic for sites that allow for a variety of uses, including 100 percent commercial development, in addition to residential development and mixed-use development. This is because of the high market value of available properties for residential development. As discussed above, the desirability and high value of residential property in Cupertino encourages residential or mixed-use 629 B-137 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT development over exclusively commercial development. All five example projects presented above were developed in a zone that allows a mix of uses including exclusively commercial and office development, further demonstrating the strength of residential development over commercial development in Cupertino. 5.5. Residential Sites Inventory Cupertino has residential development opportunities with sufficient capacity to meet and exceed the identified housing need (Figure B-7). The opportunities shown in the sites inventory consist predominantly of underutilized sites that can accommodate 1,386 residential units on properties zoned for densities of 20 dwelling units to the acre or more. The sites inventory is organized by geographic area and in particular, by mixed use corridors. As shown, a large proportion of the near-term development potential lies within the Heart of the City Special Area. One additional site is located in the North De Anza Special Area. As indicated in a market study completed in 2014, there is a healthy demand for new housing and long-term trends indicate market potential for additional development in key areas throughout the city. The City has undertaken a comprehensive General Plan Amendment that authorizes new development capacity in the identified areas of the City with highest demand. The market study further found that existing demand is greatest for smaller, more affordable units adjacent to services, retail, and entertainment options. All sites in the Housing Element to meet the RHNA are identified on major mixed-use corridors, close to services and major employers. As demonstrated previously, City leaders have a strong record of supporting and facilitating the development of residential projects in mixed-use areas and of intensifying residential uses where appropriate within the context of the 630 B-138 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT general plan land use allocations. Regulatory standards, including the revised Density Bonus Ordinance, are intended to encourage additional residential development on these sites. Altogether, the six sites ensure that adequate sites beyond the remaining RHNA are provided for in the planning period. No identified constraints on these sites would prevent development or reuse during the Housing Element period. A parcel-specific listing of sites is included in Section 7.3: Sites Inventory Table. Heart of the City Special Area The Heart of the City Special Area is a key mixed-use, commercial corridor in Cupertino. Development within this Special Area is guided by the Heart of the City Specific Plan, which is intended to create a greater sense of place, community identity, and a positive and memorable experience for residents, workers and visitors in Cupertino. The area encompasses approximately 635 acres along Stevens Creek Boulevard between Highway 85 and the eastern city limit. The Stevens Creek Boulevard corridor functions as Cupertino’s main mixed-use, commercial and retail corridor. A majority of the Heart of the City Special Area is located within a Priority Development Area (PDA). PDAs are the result of a regional initiative that identifies areas where new development will support the day-to-day needs of residents and workers in a pedestrian-friendly environment served by transit. PDAs are critical components for implementing the region’s proposed long term growth strategy. The level of growth in each PDA reflects its role in achieving regional objectives and how it fits into locally designated priority growth plans. Cupertino’s PDA area, shown on Figure B-7, includes properties within a quarter mile of Stevens Creek Boulevard from Highway 85 to the City’s eastern border and a portion of North and South De Anza Boulevards. 631 B-139 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT North Vallco Park: 344 Units Heart of the City: 1,042 Units Sunnyvale Santa Clara San Jose Los Altos Site 5 93 units Site 1 235 units Site 4 103 units Site 6 11 units Site 3 344 units Site 2 600 units 01000 0500 20003000 0 0.5 1Mile 1000 Feet Meters Special Areas Legend City Boundary Urban Service Area Boundary Sphere of Influence Boundary Agreement Line Unincorporated Areas North Vallco Park Heart of the City Housing Elements Sites VTA Priority Development Area (PDA) Site units Site Number: Realistic Capacity. Note: Realistic capacity is 85% of maximum capacity allowed under Alternative C Figure B-7 Housing Element Sites to Meet the RHNA 632 B-140 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT To meet the RHNA, five sites encompassing over 92 acres have been identified within the Heart of the City Special Area boundaries; these sites can accommodate 1,042 units at densities greater than 20 units per acre. Four sites are underutilized infill properties, one site is vacant. For underutilized parcels, the age of onsite buildings and the parcels’ improvement-to-land value (I/L) ratio suggest that these sites are prime opportunities for redevelopment. In addition, the redevelopment capacity of identified sites is predicated on interest articulated by property owners and recent development approvals in the area, including the Metropolitan (107 units), Adobe Terrace (23 units), Main Street (120 units), and Rose Bowl (204 units) mixed-use projects. Site 1 (The Oaks Shopping Center) Site 1 is located on the north side of Stevens Creek Blvd between Highway 85 and Mary Avenue in the Oaks Gateway within the Heart of the City Special Area. The site is comprised of four parcels (with two owner entities that function under the same ownership) totaling 7.9 acres and is occupied by the Oaks Shopping Center. The center has various small-scale commercial and restaurant tenants. Although the Center is in relatively good condition, it was originally constructed in 1976 as a single story with ample surface parking, and has a resulting low floor-area ratio. The I/L ratio for the consolidated property is estimated at 0.31. The property owners are very interested in redevelopment of the site with a mixed-use (residential and commercial) product. The zoning for this property was revised in 2014 to allow residential in addition to commercial uses. The site presents a strong potential for a redevelopment project that includes residential units based on its large size, potential residential capacity, adjacent freeway access, and location adjacent to residential development. A retail 633 B-141 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Site 1: The Oaks Shopping Center strategy report completed for Cupertino in 2014 identifies the Oaks as a site well positioned for redevelopment, perhaps as a retail-residential mixed-use project. Its location on Stevens Creek Boulevard adjacent to Highway 85 and in the Heart of the City District makes high-density multi- family residential development feasible at this site. Several relatively high-density mixed-use, residential projects are in close proximity on Stevens Creek Boulevard. Site 1 is located within a Priority Development Area. The site is designated for Commercial/Office/Residential in the General Plan, zoned Planned Development with General Commercial and Residential (P[CG, Res]), and allows for a maximum density of 35 units per acre. Site 1 has the potential to yield 235 units. 634 B-142 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Site 2 (Vallco Shopping District ) The Vallco Shopping Mall is centrally located in the City. The property was originally developed as an indoor mall in the 1970s and consists of 14 parcels developed for retail uses, anchored by Macy’s, Sears, JC Penny, and AMC Theaters. The property has been remodeled several times since it was built. Despite being the largest retail project in the City, the Mall is largely vacant, save for the anchor tenants who continue to perform well, primarily due to low holding costs associated with the property. According to stakeholders interviewed for a retail strategy report completed in 2014, Vallco represents not only one of the best-located properties in the City, but also one of the City’s largest redevelopment opportunities. The Vallco Shopping District is physically divided by North Wolfe Road, but connected via an elevated bridge. The 47.83-acre site has five property owners, representing a combination of investors and anchor tenants. The 2014 retail strategy report also notes that there is an oversupply of mall space in the United States, which is affecting Vallco’s performance. The Mall operates in a competitive environment with successful projects to the north (Stanford Shopping Center), east (Valley Fair and Santana Row), and south (Westgate Shopping Center). In addition the nearby Main Street mixed-use development will add an additional 125,000 square feet of retail, further contributing to the market feasibility of alternate (residential) uses on this site. To revitalize this area, the City envisions a complete redevelopment of the existing Vallco Fashion Mall into a vibrant mixed-use “town center” that is a focal point for regional visitors and the community. The site has a high 635 B-143 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Site 2: Vallco Shopping District potential for redevelopment due to expressed property owner interest to redevelop and consolidate, high retail vacancy rates, close proximity to major transportation routes (freeway), and the potential to provide a considerable number of units at the site. The high potential development capacity and close proximity to two recently constructed mixed-use projects (Rosebowl and Main Street) further support redevelopment of the Vallco mall and the inclusion of this site in the Housing Element. The General Plan Land Use Element envisions complete redevelopment of the property, and establishes a policy to create a specific plan for the property to foster development of the cohesive mixed-use district. The zoning for the site was modified 636 B-144 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT in 2014 to allow residential uses as part of a mixed-use development. The site is designated Commercial/Office/Residential in the General Plan and zoned Planned Development with Regional Shopping, Office Professional, and Residential (P[Regional Shopping, OP, Res]) which allows for residential uses at a maximum density of 35 units per acre. Site 2 has the potential to yield 600 units. Site 3 (The Hamptons) Site 3 (The Hamptons) is discussed below under the North Vallco Park Special Area. Site 4 (United Furniture/East of E. Estates Drive) Site 4 is located at the southwest corner of Stevens Creek Boulevard and Miller Avenue and includes the properties on both sides of Estates Drive, north of Richwood Drive. The site is comprised of six parcels and a portion of E. Estates Drive, totaling approximately 4.86 acres. The three parcels on the west side of Estates Drive are occupied by an older strip mall with a mix of occupied and vacant retail spaces. The strip mall was built in 1960, and the I/L value of the three parcels ranges from 0.01 to 0.28. The three parcels are held in common ownership; lot consolidation would not be necessary. The parcels on the west side of Estates Drive were included in the 2007 Housing Element as a housing site. Given the high level of expressed developer interest in this site, three additional parcels on the east side of Estates Drive have been added to the original site, one of which is under common ownership with the parcels on the west side of the site. The three parcels on the east side of Estates Drive are currently used for commercial purposes and are occupied by a gas station, a restaurant and a dental office. 637 B-145 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Site 4: United Furniture/East of E. Estates Drive The I/L of the three parcels east of Estates Drive ranges from 0 to 1.6. Although one of the six parcels that comprise the site has a higher improvement-to-land ratio, in general the value of the land on this site significantly exceeds the value of the buildings on the site. Site 4 is one of the top redevelopment opportunities in the city due to its prime location on Stevens Creek Boulevard in the Heart of the City Special Area. Future development on this large site could capture a portion of the road for a cohesive development and benefit from its prime location at the city’s core. Site 4 is located directly across from the Vallco Shopping Mall and within one block of both the Rose Bowl and Main Street mixed-use developments, both high- intensity developments expected to be major community focal points. 638 B-146 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT The site also enjoys easy freeway access, is located in an area that is best served by public transportation, and is adjacent to existing residential neighborhoods. Developers have consistently expressed interest in redeveloping this site. Site 4 is located within a Priority Development Area. The site is designated for Commercial/Office/Residential and is within the Planned Development with General Commercial and Residential (P[CG, Res)] zone which allows for a maximum density of 25 units per acre. Site 4 has the potential to yield 103 units. Site 5 (Glenbrook Apartments) Site 5 contains the Glenbrook Apartments that are not built to the maximum allowed density in the Heart of the City Special Area. The apartment complex has large open spaces that exceed open space requirements established in the Zoning Code. As such, additional units could be built on the site. Spanning 31.3 acres, the site could accommodate 626 units under existing zoning, which allows for a density of 20 dwelling units to the acre. However, the Glenbrook Apartments only contains 517 units, resulting in additional potential for up to 109 residential units. Assuming Glenbrook Apartments is able to achieve 85 percent of the site’s remaining capacity, the realistic net yield for Site 5 is 93 new units. A similar type of infill development that involves the expansion of garden apartment complexes has previously been approved and completed in Cupertino at the Markham (formerly known as Villa Serra) and Biltmore developments. At the Biltmore, carports were demolished and new units constructed above ground-floor parking. New units and additional parking were added to the Markham complex in surplus open space and recreational areas. The Biltmore project added 29 units for a total project size of 179 units, while the Villa Serra development added 117 units to achieve a total of 639 B-147 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Site 5: Glenbrook Apartments 506 units. In both cases, existing units were not destroyed to accommodate the expansion. Furthermore, in 2013 the Biltmore added six units by demolishing existing carports and has received entitlements to add seven units above a clubhouse serving the development in an existing open space area in 2014. Similar to the Biltmore Apartments, the Glenbrook Apartments complex has large areas of land dedicated to carports. As was done in the Biltmore development, the carport areas can be converted to ground floor parking with new units above. Additional units could be constructed without affecting existing residential units at the site. This site was recommended by members of the public and the community supports the expansion of the Glenbrook Apartments. The trend of adding new units to existing garden apartment complexes is expected to continue in Cupertino due to the limited supply of vacant land and the high demand for residential units in the city. The financial feasibility of additional units on Site 5 is particularly strong because the property has long-time landowners who purchased the land when prices were much lower. Site 5 was included in the 2007 Housing Element. 640 B-148 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT The site is designated in the General Plan as Medium Density (10 to 20 dwelling units per acre) and zoned Multi- Family Residential (R3), allowing for a maximum density of 20 units per acre. Site 5 has the potential to yield 93 new units. Site 6 (Barry Swenson) Site 6 is a vacant 0.55-acre property located along the south side of Stevens Creek Boulevard, mid-block between Finch Avenue and North Tantau Avenue. The site is located across the street from the 17.4-acre Main Street mixed-use project constructed in 2014. Main Street is a high-intensity development expected to be major community focal point. Although Site 6 is relatively small compared to other sites included in the inventory, its location on Stevens Creek Boulevard and in the Heart of the City Special Area is conducive to relatively dense multi- family residential development. Furthermore, high-density multi-family development has been built on parcels of less than one acre in Cupertino, including the 23-unit Adobe Terrace project. The site is located along one of the major transportation corridors in Cupertino, and in close proximity to services and public transportation in the Heart of the City Special Area. The owner of the property has expressed interest in developing with residential uses, including affordable products. Site 6 is located within a Priority Development Area. Site 6 was included in the 2007 Housing Element. The site is designated in the General Plan for Commercial/Office/ Residential and is within the Planned Development with General Commercial and Residential (P[CG, Res]) zone, which allows for a maximum density of 25 units per acre. Site 6 has the potential to yield 11 units. 641 B-149 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Site 6: Berry Swenson Property TABLE 5.1: SUMMARY OF RESIDENTIAL CAPACITY IN HEART OF THE CITY SPECIAL AREA Site General Plan/Zoning Max Density (DUA) Acres Realistic Capacity (units) Affordability Level Site 1 (The Oaks Shopping Center)C/O/R P(CG, Res, OP) 357.9235 Very Low/Low Site 2 (Vallco Shopping District)C/O/R P(Regional Shopping, OP, Res) 3547.83 600 (max)Very Low/Low Site 4 (United Furniture/East of East Estates Drive)C/O/R P(CG, Res) 254.86103 Very Low/Low Site 5 (Glenbrook Apartments)Medium Density R3(10-20) 2031.3493 Very Low/Low Site 6 (Barry Swenson)C/O/RP(CG, Res)250.5511 Very Low/Low Total 92.481,042 Notes: (a) Realistic capacity for each site reduces the maximum developable units by 15 percent. (b) Identified capacity of sites that allow development densities of at least 20 units per acre are credited toward the lower-income RHNA based on State law. Pursuant to Government Code Section 65583.2(c)(3)(B), local governments may utilize “default” density standards to provide evidence that “appropriate zoning” is in place to support the development of housing for very-low and low-income households . The default density standard for Cupertino and other suburban jurisdictions in Santa Clara County is 20 dwelling units per acre (DUA) or more. (c) Residential capacity for Site 5 reflects a net increase in units. Source: City of Cupertino, 2014 642 B-150 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT North Vallco Park Special Area The North Vallco Park Special Area encompasses 240 acres and is an important employment center for Cupertino and the region. The area is located in the northeastern corner of the City, bounded by Homestead Road to the north and Interstate 280 to the south. The area is defined by Apple Campus 2 and the North Vallco Gateway. The North Vallco Gateway includes a medium to high-density multi-family residential project east of Wolfe Road and two hotels and the Cupertino Village Shopping Center west of Wolfe Road. The North Vallco Park area is envisioned to become a sustainable office and campus environment surrounded by a mix of connected, high-quality and pedestrian-oriented neighborhood center, hotels and residential uses. Taller heights may be allowed in the North Vallco Gateway pursuant to the Land Use and Community Design Element. The Apple 2 Campus is expected to be a significant catalyst for residential development in this vicinity. The area accordingly presents a prime opportunity for redevelopment. Site 3 (The Hamptons) Site 3 is located at the south-east corner of the intersection of Pruneridge Avenue and North Wolfe Road adjacent to the recently approved Apple Campus 2. The site is comprised of two parcels totaling 12.44 acres and is currently occupied with a 342-unit multi-family housing development and surface parking lots. The site’s property owners have expressed interest in redeveloping the site with significantly higher residential densities than what exists today. Such a redevelopment will create an opportunity to reduce vehicle trips for employees living within walking and bicycling distance to this regional employment hub. The property owner has publically voiced interest in redevelopment of the property to provide additional residential units. The site has a land use designation of High Density (greater than 35 du/ac), zoned Planned Development (P [Res]), and 643 B-151 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT allows for a maximum density of 65 units per acre. Site 3 has the potential to yield 344 net units, for a total of 686 units on site. The close proximity to major transportation routes (freeway) and adjacency to a major new employment center (Apple Campus 2), coupled with the high demand for multi- family residential units in Cupertino, make this site ideal for intensification. Site 3: The Hamptons TABLE 5.2: SUMMARY OF RESIDENTIAL CAPACITY IN NORTH VALLCO PARK SPECIAL AREA Site General Plan/Zoning Max Density (DUA) Acres Realistic Capacity (units) Affordability Level Site 3 (The Hamptons)High Density P(Res) 6512.44344 Very Low/Low Total 12.44344 Notes: 1. Realistic capacity for each site reduces the maximum developable units by 15 percent. 2. Identified capacity of sites that allow development densities of at least 20 units per acre are credited toward the lower-income RHNA based on State law. Pursuant to Government Code Section 65583.2(c)(3)(B), local governments may utilize “default” density standards to provide evidence that “appropriate zoning” is in place to support the development of housing for very-low and low-income households . The default density standard for Cupertino and other suburban jurisdictions in Santa Clara County is 20 dwelling units per acre (DUA) or more. 3. Residential capacity for Site 3 reflects a net increase in units. Source: City of Cupertino, 2014 644 B-152 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT 5.6. Adequacy of Sites for RHNA The sites inventory identifies capacity for 1,386 units, all of which are on sites suitable for development of affordable housing. Overall, identified housing sites have the ability to adequately accommodate the remaining RHNA of 1,002 units. Table 5.3 summarizes the RHNA status. TABLE 5.3: COMPARISON OF SITES AND RHNA Income Category Sites Remaining RHNA Surplus/ Shortfall(+/-) Extremely Low and Very Low1,386 356 Low --207 Moderate --196 Above Moderate --243 Total 1,386 1,002+384 Source: City of Cupertino, 2014 5.7. Environmental Constraints The sites inventory analysis reflects land use designations and densities established in the General Plan Land Use and Community Design Element. Thus, any environmental constraints that would lower the potential yield have already been accounted for. Sites identified to meet the RHNA are located in urbanized areas on previously developed sites; as such, there are no wetlands or other important biological issues of concern. Any additional constraints that would occur on a more detailed site review basis would be addressed as part of the individual project review process. The capacity to meet the regional share and individual income categories are not constrained by any environmental conditions. 645 B-153 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT 5.8. Availability of Site Infrastructure and Services Site development potential indicated in the sites inventory is consistent with (and in most cases lower than) the development capacity reported in the Land Use and Community Design Element. Full urban-level services are available throughout the city and specifically to each site in the inventory. Such services are more than adequate for the potential unit yield on each site. As indicated in the EIR for the General Plan Amendment and the Housing Element, there are sufficient water supplies available to serve the sites identified to meet the RHNA. With regard to sewer capacity, some capacity deficiencies exist in certain areas of Cupertino, including sewer lines serving the City Center area and lines on Stelling Road and Foothill Boulevard. As a result, the Cupertino Sanitary District requires developers of substantial projects to demonstrate that adequate capacity exists, or to identify the necessary mitigations. Development within these areas is reviewed on a case-by-case basis to ensure that adequate sewer capacity exists. 5.9. Zoning for Emergency Shelters and Transitional and Supportive Housing To facilitate the development of emergency housing and comply with State law, the City amended the Zoning Code in 2010 to address emergency shelters and transitional and supportive housing. Emergency Shelters An emergency shelter is a facility that provides temporary housing with minimal supportive services and is limited to occupancy of six months or less. Emergency homeless shelters are designated as a permitted use in the Quasi Public Building (BQ) zone. The ordinance includes the following emergency shelter operational regulations: • The number of occupants does not exceed 25 646 B-154 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT • Adequate supervision is provided • Fire safety regulations are met • A management plan is provided which includes a detailed operation plan • Shelter is available to any individual orhousehold regardless of their ability to pay • Occupancy is limited to six months or less. HE-Strategy 22 states that the City will ontinue to facilitate housing opportunities for special needs persons by allowing emergency shelters as a permitted use in the “BQ” Quasi- Public zoning district. In addition, rotating homeless shelters are also permitted within existing church structures in the BQ zone under similar conditions. The operation period of rotating shelters cannot exceed two months in any one-year span at a single location. Transitional and Supportive Housing Transitional housing is defined as rental housing for stays of at least six months but where the units are re-circulated to another program recipient after a set period. Supportive housing has no limit on the length of stay, and is linked to onsite or offsite services. Senate Bill 2 clarified that transitional housing and supportive housing constitute residential uses. Zoning ordinances must treat transitional and supportive housing as a proposed residential use and subject only to those restrictions that apply to other residential uses of the same type in the same zone. In Cupertino, transitional and supportive housing developments are treated as residential land uses subject to the same approval process and development standards as other residential uses. The Zoning Code lists transitional and supportive housing as a permitted use in all zones allowing residential. These facilities are subject to the same development standards and permit processing criteria 647 B-155 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT required for residential dwellings of the same type in the same zones. 5.10. Financial Resources for Housing The City of Cupertino has access to a variety of funding sources for affordable housing activities. These include programs from federal, state, local, and private resources. Community Development Block Grant (CDBG) Program Through the Community Development Block Grant (CDBG) program, the federal Department of Housing and Urban Development (HUD) provides funds to local governments for funding a wide range of housing and community development activities for low-income persons. During the 2013 fiscal year, the City of Cupertino received $342,702 in CDBG funds. CDBG funds are used for public services, site acquisition, housing rehabilitation, and fair housing/housing counseling activities. HOME Investment Partnership Program (HOME) The City of Cupertino is proposing to enter into a multi-city HOME Consortium with the County of Santa Clara. If the HOME Consortium is approved, developers of eligible affordable housing projects within the City of Cupertino could competitively apply annually to the County of Santa Clara for HOME Funds for City of Cupertino affordable housing projects. If the HOME Consortium is approved the initial program year in which HOME funds will become eligible to the City of Cupertino will begin July 1, 2015. Eligible HOME activities may include, but are not limited to acquisition, construction, rehabilitation and tenant based rental assistance (TBRA). Redevelopment Agency Set-Aside Funds Redevelopment Agency (RDA) housing set-aside funds, which used to be a primary local funding source for 648 B-156 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT affordable housing, are no longer available to assist in new affordable housing development or acquisition/rehabilitation of existing units for conversion into affordable housing. This loss is associated with the Governor’s 2011 state budget revisions and subsequent court cases, and as a result, funding sources for affordable housing are significantly more constrained. Cupertino’s Redevelopment Agency dissolved as of February 1, 2012 according to state law. The City elected to become a Successor to the Redevelopment Agency (Successor Agency) in order to manage the wind- down of remaining contracts and obligations of the former Redevelopment Agency. The City does not have any available housing bond funds remaining from this source nor is it anticipated to receive program income in the future. Low Income Housing Tax Credits (LIHTC) Created by the 1986 Tax Reform Act, the LIHTC program has been used in combination with City and other resources to encourage the construction and rehabilitation of rental housing for lower-income households. The program allows investors an annual tax credit over a 10-year period, provided that the housing meets the following minimum low-income occupancy requirements: 20 percent of the units must be affordable to households at 50 percent of AMI or 40 percent of the units must be affordable to those at 60 percent of AMI. The total credit over the 10-year period has a present value equal to 70 percent of the qualified construction and rehabilitation expenditure. The tax credit is typically sold to large investors at a syndication value. Mortgage Credit Certificate (MCC) Program The Mortgage Credit Certificate (MCC) Program was created by the federal government, but the program is locally administered by the County of Santa Clara to assist first-time homebuyers in qualifying for a mortgage. The IRS allows eligible homebuyers with an MCC to take 20 percent of their annual mortgage interest as a dollar-for-dollar tax credit against their federal personal income tax. This enables 649 B-157 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT first-time homebuyers to qualify for a larger mortgage than otherwise possible, and thus can bring home ownership within reach. In 1987, the County of Santa Clara established an MCC Program that has since assisted over 200 low and moderate-income first time homebuyers in Cupertino to qualify for a mortgage. However, as housing prices continue to rise in Cupertino, use of MCC has become less feasible. During the last Housing Element period, the MCC Program assisted three Cupertino low- and moderate-income residents. Housing Choice Voucher Program The Housing Choice Voucher Program (formerly known as Section 8 Rental Assistance) is a federal program that provides rental assistance to very-low income persons in need of affordable housing. This program offers a voucher that pays the difference between the current fair market rent and what a tenant can afford to pay (e.g. 30 percent of their income). The voucher allows a tenant to choose housing that may cost above the payment standard but the tenant must pay the extra cost. Housing Trust Silicon Valley Housing Trust Silicon Valley provides loans and grants to increase the supply of affordable housing, assist first- time homebuyers, prevent homelessness and stabilize neighborhoods. The Housing Trust’s Affordable Housing Growth Fund intakes funds from local jurisdictions and provides matching grants for predevelopment activities, acquisition, and construction and rehabilitation of multi- family affordable housing developments. The City of Cupertino has contributed to the Fund through its former Redevelopment Agency. Below Market Rate (BMR) Affordable Housing Fund (AHF) The City of Cupertino has a Below Market Rate Affordable Housing Fund that provides financial assistance to affordable 650 B-158 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT housing projects, programs and services. The City requires payment of an Office and Industrial Mitigation fee, which is assessed on developers of office and industrial space and a Housing Mitigation fee, which is assessed on developers of market-rate rental housing to mitigate the need for affordable housing created by new development. Developers of for-sale housing with six or fewer units are required to pay the Housing Mitigation fee. Developers of market-rate rental units, where the units cannot be sold individually, must pay the Housing Mitigation fee to the Affordable Housing Trust Fund to be consistent with recent court decisions and the State Costa-Hawkins Act regarding rent control. All affordable housing mitigation fees are deposited into the City’s Below Market-Rate (BMR) Affordable Housing Fund (AHF). Recent funding activities have included loans and grants to non-profit developers for acquisition and rehabilitation activities and public services such as landlord/tenant mediation services provided through Project Sentinel, and assistance to very low income persons and families provided through West Valley Community Services. As of 2014, there is approximately $7 million in the BMR Affordable Housing Fund. General Fund Human Service Grants (HSG) Program Annually, the City of Cupertino provides approximately $40,000 to non-profit agencies providing needed services to Cupertino residents. HSG Program funds are proposed to be allocated on a competitive basis toward eligible public service activities. Recent recipients have used the funds to provide transitional housing for domestic violence victim, senior adult day care services and legal assistance services to seniors. 6. ANALYSIS OF CONSISTENCY WITH GENERAL PLAN The City’s various General Plan components were reviewed to evaluate their consistency with the policies and strategies outlined in the Housing Element Update. The following 651 B-159 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT section summarizes the goals of each General Plan element and identifies supporting Housing Element policies and strategies. This analysis demonstrates that the policies and strategies of this Housing Element provide consistency with the policies set forth in the General Plan and its associated elements. When amendments are made to the safety, conservation, land use, or other elements of the City’s General Plan, the housing element will be reviewed for internal consistency. Section 6.1. Land Use/Community Design Goals • Create a cohesive, connected community with a distinctive center and an identifiable edge • Ensure a compact community boundary that allows efficient delivery of municipal services • Establish a high sense of identity and community character • Maintain a thriving and balanced community • Promote thriving and diverse businesses that bring economic vitality to the community, while balancing housing, traffic and community character impacts • Protect hillsides and promote regional planning coordination • Expand City-wide access to community facilities and services • Protect historically and archaeologically significant structures, sites and artifacts • Promote a civic environment where the arts express an innovative spirit, celebrate a rich cultural diversity and inspire individual and community participation • Create a full range of park and recreational resources that 652 B-160 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT link the community, provide outdoor recreation, preserve natural resources and support public health and safety Supporting Housing Element Policies Policies HE-2, HE-3, HE-4, HE-5, and HE-13 Supporting Housing Element Strategies HE Strategies 1 and 26 Section 6.2. Circulation Goals • Advocate for regional transportation planning decisions that support and complement the needs of Cupertino • Increase the use of public transit, carpools, bicycling, walking and telecommuting • Create a comprehensive network of pedestrian and bicycle routes and facilities • Increased the use of public transit service and encourage the development of new rapid transit service • Maintain roadway designs that accounts for the needs of motorists, pedestrians, bicycles and adjacent land uses • Minimize adverse traffic and circulation impacts on residential neighborhoods Supporting Housing Element Policies Policy HE-3 and HE-14 Supporting Housing Element Strategies HE Strategies 3 and 26 Section 6.3 Environmental Resources/ Sustainability Goals 653 B-161 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT • Ensure a sustainable future for the City of Cupertino • Reduce the use of non-renewable energy resources • Improve energy conservation and building efficiency • Maintain healthy air quality levels for the citizens of Cupertino through local planning efforts • Protect specific areas of natural vegetation and wildlife habitation to support a sustainable environment • Ensure mineral resource areas minimize community impacts and identify future uses • Ensure the protection and efficient use of water resources • Improve the quality of storm water runoff • Reduce locally produced solid waste in order to reduce energy, protect resources and meet or exceed state requirements • Ensure adequate sewer capacity • Ensure adequate public infrastructure for existing uses and planned growth Supporting Housing Element Policies Policies HE-10 and HE-14 Supporting Housing Element Strategies HE Strategies 20, 21 and 26 Section 6.4 Health and Safety Goals • Reduce hazard risks through regional coordination and mitigation planning • Reduce risks associated with geologic and seismic hazards 654 B-162 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT • Protect the community from hazards associated with wildland and urban fires through efficient and effective fire and emergency services • Minimize the loss of life and property through appropriate fire prevention measures • Create an all-weather emergency road system to serve rural areas • Ensure available water service in the hillside and canyon areas • Ensure high quality police services that maintain the community’s low crime rate and ensure a high level of public safety • Protection people and property from the risks associated with hazardous materials and exposure to electromagnetic fields • Ensure a high level of emergency preparedness to cope with both natural or human-caused disasters • Protect people and property from risks associated with floods • Maintain a compatible noise environment for existing and future land uses • Reduce the noise impact from major streets and freeways on Cupertino residents • Protect residential areas as much as possible from intrusive non-traffic noise • Design buildings to minimize noise Supporting Housing Element Policies N/A 655 B-163 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT Supporting Housing Element Strategies N/A 7. SUPPLEMENTAL MATERIALS 7.1 Stakeholder Interviews Stakeholder interviews were conducted on December 11 and 12, 2013 to solicit input from stakeholders ranging from community members, property owners, housing developers, service providers, School Districts and the business community. The following agencies were invited to participate (bolded agencies and persons participated, totaling 25 people): Advocates for a Better Cupertino CARe (Cupertino Against Rezoning) CCC (Concerned Citizens of Cupertino) Cupertino Citizens for Fair Government (CCFG) De Anza College Silicon Valley Leadership Group Cupertino Chamber of Commerce Asian American Business Council West Valley Community Services League of Women Voters HBANC (Bay Area Building Industry Association) Housing Choices Coalition Organization of Special Needs Families Silicon Valley Association of Realtors Catholic Charities of Santa Clara County Eden Council for Hope and Opportunity Live Oak Adult Day Services 656 B-164 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Maitri Senior Adults Legal Assistance (SALA) Rotary Club Rebuilding Together Silicon Valley Senior Housing Solutions Charities Housing YWCA Silicon Valley-Support Network Department United Way Silicon Valley Outreach and Escort Santa Clara Family Health Foundation Support Network for Battered Women Institute for Age-Friendly Housing Senior Citizens Commission Santa Clara County Council of Churches Mid Pen Housing Habitat For Humanity East Bay/Silicon Valley Chinese American Realtors Association Fremont Union High School District Cupertino-Fremont Council of PTA Cupertino Union School District Modena Investments LP, Sunnyvale Holding LLC Altos Enterprises Inc., Alpha Investments & Property Management Co. LPMD Architects Unaffiliated builders, lenders, and property owners 657 B-165 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT A summary of common themes from the interviews is summarized below. All comments and ideas are reported in aggregate and not attributed to any individual or organization. Housing Needs: • Overall housing affordability and the difference between housing demand and supply at all income levels • Need for diversity of affordable rental units at all income levels and all household types • Need to accommodate a growing aging population • Smaller units including innovative housing models (e.g. dorms/boarding houses, senior care homes, efficiency studios, shared & co-housing, micro units) Community acceptance: • Acceptance is low due to impacts on schools, privacy, parking, noise and traffic • Support for mixed use development in the style of Santana Row and Downtown Mountain View • Improved local governmental transparency and community development Type of development: • Developers and advocates felt that three to five story development is appropriate for adding units but community representatives are concerned about increased height of multi-family development 658 B-166 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT Barriers to development of affordable housing include: • Financial constraints, particularly due to the dissolution of Redevelopment Agencies and elimination of many federal and state funding sources and • Lack of community and political support for housing Community and Business Groups: • Housing is a “choke point” in regional economy since it is hard to attract and retain employees in a highly competitive housing market • Several interviewees felt that private employers should be obligated to provide more resources to housing • Many felt that while employers feel concerned about schools and housing, they generally work to limit fees and taxes to businesses School Districts: • Schools in the northern part of the City are impacted due to higher student generation rates in existing housing while capacity in the south of the city is declining, likely due to aging households. • Capacity, where needed, is being expanded by adding new buildings or, preferably, temporary and modular units. • Currently using programs, centers and busing to distribute students • Reluctant to re-district since homeowners purchase homes based on the school service areas • Most of the Apple Campus 2 school impact fees will be allocated to the Santa Clara Unified School District 659 B-167 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT while they expect that most employees who move to the area will reside within the CUSD service 7.2. Review of Previous Housing Element A thorough review of the City’s housing plan constitutes an important first step in updating the Cupertino Housing Element. This section provides an evaluation of the City’s progress towards achieving housing goals and objectives as set forth in the prior Housing Element, and analyzes the efficacy and appropriateness of the City’s housing policies and programs. This review forms a key basis for restructuring the City’s housing plan to meet the housing needs of the Cupertino community. Table 7.1 provides a detailed summary of the City’s progress in implementing the programs outlined in the 2007-2014 Housing Element and Table 7.2 summarizes the City’s progress toward its RHNA. TABLE 7.1: SUMMARY OF ACCOMPLISHMENTS OF 2007-2014 HOUSING ELEMENT IMPLEMENTATION PROGRAMS 2007-2014 Housing Element Goals, Policies and Programs 2007-2014 Housing Element Program Accomplishments Continued Appropriateness for 2014- 2022 Housing Element Goal A: An Adequate Supply of Residential Units for All Economic Segments Policy 1: Sufficiently Residentially Zoned Land for New Construction Need Program 1: Zoning and Land Use Designations Rezone one property (APN: 326-10-046) of 7.98 acres from 10 units per acre to 25 units per acre to accommodate up to 199 units. The City completed the rezoning of 7.98 acres of land from 10 du/ac to 25 du/ac in 2010. The City is currently updating the Land Use Element concurrent with the Housing Element update. The Land Use Element update will likely result in addi- tional sites for residential and mixed use development to accommodate the fifth cycle RHNA of 1,064 units. This program is proposed to be included and revised in the 2014-2022 Housing Element to reflect the need to maintain an inventory of sites to accommodate the new RHNA of 1,064 units. Program 2: Second Dwelling Unit Ordinance Continue to implement ordinance to achieve 25 second units Between 2007 and 2013, 31 second units were constructed in the City. This program continues to be appropriate for the City and is proposed to be includ- ed in the 2014-2022 Housing Element. Program 3: Encourage Lot Consolidation Continue to encourage lot consolidation through master plans. Provide technical assistance to property owners. The City continues to provide assistance to property owners regarding lot consoli- dation. This is an ongoing activity and is pro- posed to be included and revised in the 2014-2022 Housing Element. 660 B-168 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT TABLE 7.1: SUMMARY OF ACCOMPLISHMENTS OF 2007-2014 HOUSING ELEMENT IMPLEMENTATION PROGRAMS 2007-2014 Housing Element Goals, Policies and Programs 2007-2014 Housing Element Program Accomplishments Continued Appropriateness for 2014- 2022 Housing Element Goal B: Housing is Affordable for a Diversity of Cupertino Households Policy 2: Housing Mitigation Plan Program 4: Housing Mitigation Plan – Office and Industrial Mitigation Continue to implement Office and Industrial Mitigation fee program. Between 2007 and 2013, $1,195,414 had been collected through the Housing Mitigation Program (Office/Industrial and Residential) and deposited to the Below Market-Rate (BMR) Affordable Housing Fund (AHF). This program represents a key financ- ing mechanism for affordable housing in Cupertino and is proposed to be included and revised in the 2014-2022 Housing Element. Program 5: Housing Mitigation Program – Residential Mitigation Continue to implement the “Housing Mitigation” program to mitigate the need for affordable housing created by new market-rate residential development. Between 2007 and 2013, 20 Below Market Rate (BMR) units were cre- ated through the Residential Housing Mitigation Program: • 17 BMR rental units (Markham) • 3 BMR ownership units (Las Palmas) The City contracts with West Valley Community Services (WVCS) to admin- ister the Below Market-Rate (BMR) Affordable Housing Program which includes placing eligible households in the City’s BMR units. Between 2007 and 2013, $1,195,414 had been collected through the Housing Mitigation Program (Office/Industrial and Residential) and deposited to the City’s Below Market-Rate (BMR) Affordable Housing Fund (AHF). This program represents a key mechanism for affordable housing in Cupertino and is proposed to be included and revised in the 2014-2022 Housing Element. Program 6: Affordable Housing Fund Provide financial assistance to affordable housing developments. Expend housing funds in the following manner: • Finance affordable housing projects. • Establish a down payment assistance plan that may be used in conjunction with the BMR program or to make market rate units more affordable. • Establish a rental subsidy program to make market rate units more affordable. Between 2007 and 2013, $1,195,414 had been collected through the Housing Mitigation Program (Office/Industrial and Residential) and deposited to the City’s Below Market-Rate (BMR) Affordable Housing Fund (AHF). These funds were used to support affordable housing proj- ects, programs and services such as: • Project Sentinel – Landlord/Tenant Mediation Services • West Valley Community Services (WVCS) – BMR Program Administration • 19935 Price Avenue – Acquisition of affordable housing residential rental property. However, the City did not establish a downpayment assistance program or a rental subsidy program. The City will continue to utilize the Below Market-Rate (BMR) Affordable Housing Fund (AHF) to support affordable hous- ing projects, programs and services. This program is proposed to be included and revised in the 2014-2022 Housing Element with a revised expanded list of potential eligible uses of funds. 661 B-169 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT TABLE 7.1: SUMMARY OF ACCOMPLISHMENTS OF 2007-2014 HOUSING ELEMENT IMPLEMENTATION PROGRAMS 2007-2014 Housing Element Goals, Policies and Programs 2007-2014 Housing Element Program Accomplishments Continued Appropriateness for 2014- 2022 Housing Element Policy 3: Range of Housing Types Program 7: Mortgage Credit Certificate (MCC) Program Participate in the countywide MCC pro- gram to assist one to two households annually. The County of Santa Clara continues to operate this program. However, given the high home prices in Cupertino, the poten- tial of utilizing this program is limited. As of 2013, the maximum purchase price limits were $570,000 for resale properties and $630,000 for new units. This program is proposed to be included in the 2014-2022 Housing Element as a new program – Referral to Housing Resources. Program 8: Move-In for Less Program Program is offered by the Apartments Association. This program offered by the Tri-County Apartment Association was discontinued in 2010. This program is proposed to be removed from the 2014-2022 Housing Element. Program 9: Surplus Property for Housing Explore opportunities on surplus proper- ties as follows: • In conjunction with local public agencies, school districts and churches, develop a list of surplus property or underutilized property that have the potential for residential development. • Encourage long-term land leases of property from churches, school districts corporations for construction of affordable units. • Evaluate the feasibility of developing special housing for teachers or other employee groups on the surplus properties. • Review housing programs in neighboring school districts that assist teachers for applicability in Cupertino As part of the 2014-2022 Housing Element update and concurrent Land Use Element update, the City has explored and prioritized various vacant and under- utilized properties with potential residen- tial and mixed use development within the next eight years. These properties are included in the sites inventory for the Housing Element This program is proposed to be included and revised in the 2015-2023 Housing Element. Program 10: Jobs/Housing Balance Program Require major new office/industrial devel- opment to build housing as part of new development projects. The City’s General Plan and 2007-2014 Housing Element offer adequate capac- ity to accommodate the City’s RHNA for the planning period. The City continues to implement its Housing Mitigation Program to enhance the jobs/housing bal- ance in the community. This program is proposed to be included and revised in the 2014-2022 Housing Element as key elements of three new programs – Land Use Policy and Zoning Provisions, Housing Mitigation Plan – Office and Industrial Mitigation and Housing Mitigation Plan – Residential Mitigation. 662 B-170 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT TABLE 7.1: SUMMARY OF ACCOMPLISHMENTS OF 2007-2014 HOUSING ELEMENT IMPLEMENTATION PROGRAMS 2007-2014 Housing Element Goals, Policies and Programs 2007-2014 Housing Element Program Accomplishments Continued Appropriateness for 2014- 2022 Housing Element Policy 4: Housing Rehabilitation Program 11: Affordable Housing Information and Support Provide information, resources and sup- port to developers who can produce affordable housing The City continues to provide informa- tion, resources, and support to develop- ers. This program is proposed to be included in the 2014-2022 Housing Element. Policy 5: Development of Affordable Housing Program 12: Density Bonus Program Allow for a density bonus and additional concessions for development of 6 or more units that provide affordable hous- ing for families and seniors As part of the 2015-2023 Housing Element update, the City is also amend- ing its Zoning Code to revise the Density Bonus Ordinance to be consistent with State law. This program is proposed to be included and revised in the 2015-2023 Housing Element. Adoption of a new revised Density Bonus Ordinance is anticipated to be completed concurrent with the 2014- 2022 Housing Element. Program 13: Regulatory Incentives for Affordable Housing Provide regulatory incentives for afford- able housing, such as waiving park dedication fees and construction tax for affordable units, or reducing parking requirement for mixed use developments. The City continues to waive park dedica- tion fees and provide parking ordinance waivers for affordable developments. This program is proposed to be included in the 2014-2022 Housing Element. Program 14: Extremely Low Income Housing Encourage the development of adequate housing to meet the needs of extremely low-income households by providing assistance and funding for affordable housing developments The City continues to support the development of housing affordable to extremely low income households. This program is proposed to be included and revised in the 2014-2022 Housing Element. The proposed revision will include Housing for Persons with Special Needs to be added to this program. Program 15: Residential and Mixed Use Opportunities in or Near Employment Centers Encourage mixed use development and the use of shared parking facilities in or near employment centers. Evaluate the possibility of allowing residential develop- ment above existing parking areas. As part of the 2015-2023 Housing Element update and concurrent Land Use Element update, the City has explored and prioritized various vacant and under- utilized properties with potential residen- tial and mixed use development within the next eight years. These properties are included in the sites inventory for the Housing Element. This program is proposed to be added as a policy statement to Goal A: An Adequate Supply of Residential Units for All Economic Segments for the 2014-2022 Housing Element to encourage mixed use development. 663 B-171 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT TABLE 7.1: SUMMARY OF ACCOMPLISHMENTS OF 2007-2014 HOUSING ELEMENT IMPLEMENTATION PROGRAMS 2007-2014 Housing Element Goals, Policies and Programs 2007-2014 Housing Element Program Accomplishments Continued Appropriateness for 2014- 2022 Housing Element Program 16: Expedited Permit Procedures Expedite permit processing for housing developments that contain at least 20 percent of units for lower-income house- holds, or 10 percent of units for very low- income households, or 50 percent of units for senior citizens. The City continues of offer expedited permit processing for affordable housing projects meeting the State Density Bonus requirements. This program is proposed to be included but revised in the 2014-2022 Housing Element as a new program - Incentives for Affordable Housing Development Policy 6: Tax Increment Funds Program 17: Redevelopment Housing Set Aside Fund Develop policies and objectives for the use of those Low and Moderate Income Housing Funds. The Redevelopment Agency was dissolved in 2012, pursuant to AB1X26 and AB1X27. Program is proposed to be removed from the 2014-2022 Housing Element. Policy 7: Housing Densities Program 18: Flexible Residential Standards Allow flexible residential development standards in planned residential zon- ing districts, such as smaller lot sizes, lot widths, floor area ratios and set- backs, particularly for higher density and attached housing developments. The City continues to offer flexible devel- opment standards. Policy 7 and this program are proposed to be included in the 2014-2022 Housing Element under Goal A to facilitate a range of housing options in the commu- nity. Program 19: Residential Development Exceeding Maximums Allow residential developments to exceed planned density maximums if they pro- vide special needs housing The City continues to provide this regu- latory incentive to facilitate affordable housing for persons with special needs. However, no development utilized this incentive between 2007 and 2013. This program is proposed to be included and revised in the 2014-2022 Housing Element as part of a new program – Housing for Extremely Low Income Households and Persons with Special Needs Program 20: Monitor R-3 Development Standards Monitor the R-3 development standards on a regular basis to ensure that the requirements do not constrain new hous- ing production. The City continues to monitor its devel- opment standards. Future residential development is likely to focus in mixed use areas in the City. As part of the Land Use Element update process conducted concurrent with the Housing Element update, the City reviewed and proposed modifications to development standards to facilitate multi-family and mixed use development. This program is proposed to be included in the 2014-2022 Housing Element as part of a new program – Land Use Policy and Zoning Provisions. Program 21: Clarify Language of Planned Development (P) District Amend the zoning ordinance to clarify that residential development in P (Res/R3) zones will require a planned development permit and not a conditional use permit. The Zoning Ordinance was amended in 2010 to clarify that residential develop- ment in the P (Res/R3) zones require a planned development permit. This program was completed in 2010 and is proposed to be removed from the 2014-2022 Housing Element. 664 B-172 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT TABLE 7.1: SUMMARY OF ACCOMPLISHMENTS OF 2007-2014 HOUSING ELEMENT IMPLEMENTATION PROGRAMS 2007-2014 Housing Element Goals, Policies and Programs 2007-2014 Housing Element Program Accomplishments Continued Appropriateness for 2014- 2022 Housing Element Goal C: Enhance Residential Neighborhoods Policy 8: Maintenance and Repair Program 22: Apartment Acquisition and Rehabilitation Provide financial assistance to eligible very low and low-income homeowners to rehabilitate their housing units. The City continues to assist non-profits with the acquisition and rehabilitation of affordable housing units such as: • Maitri Transitional Housing Rehabilitation: CDBG funds were used to rehabilitate this four-unit transitional housing for victims of domestic violence. Project was completed in 2010. • Senior Housing Solutions – 19935 Price Avenue: Acquisition and rehabilitation of this property using the Below Market-Rate (BMR) Affordable Housing Fund (AHF) and Community Development Block Grant (CDBG) funds and was completed in 2011. This home is now occupied by five low income seniors. Preserving and improving the quality of housing for lower income households is important to the City. This program is proposed to be included and revised in the 2014-2022 Housing Element to incor- porate both rehabilitation efforts for both single-family and multi-family rehabilita- tion. Policy 9: Conservation of Housing Stock Program 23: Preservation of “At Risk Units” Monitor owners of at-risk projects on an ongoing basis to determine their inter- est in selling, prepaying, terminating or continuing participation in a subsidy pro- gram. Work with owners, tenants, and nonprofit organizations to assist in the nonprofit acquisition of at-risk projects to ensure long-term affordability of develop- ments where appropriate. The City did not experience a loss of any “at risk” affordable units converting to market-rate during the planning period The City works to preserve its affordable housing stock. This program is proposed to be included and revised in the 2014- 2022 Housing Element. Program 24: Condominium Conversions Continue to implement to Condominium Conversion Ordinance. The City continues to implement the Condominium Conversion Ordinance. This program is proposed to be included and revised in the 2014-2022 Housing Element. 665 B-173 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT TABLE 7.1: SUMMARY OF ACCOMPLISHMENTS OF 2007-2014 HOUSING ELEMENT IMPLEMENTATION PROGRAMS 2007-2014 Housing Element Goals, Policies and Programs 2007-2014 Housing Element Program Accomplishments Continued Appropriateness for 2014- 2022 Housing Element Program 25: Rental Housing Preservation Program Develop and adopt a program that would grant approval only if at least two of the following three circumstances exist: • The project will comply with the City’s BMR Program based on the actual number of new units constructed, not the net number of units; and/or • The number of rental units to be provided on the site is at least equal to the number of existing rental units; and/or • No less than 20 percent of the units will comply with the City’s BMR Program. The City has explored the extent to which the proposed Rental Housing Preservation Program is consistent with State laws such as the Ellis Act and the Costa Hawkins Act. The City will continue to explore the extent to which existing rental housing can be preserved consistent with State law as part of the 2014-2022 Housing Element. Program 26: Conservation and Maintenance of Affordable Housing Develop a program to encourage the maintenance and rehabilitation of residen- tial structures to preserve the older, more affordable housing stock. The City contracts with Rebuilding Together Silicon Valley (RTSV) to provide home safety repairs and mobility/ acces- sibility improvements to income-qualified owner-occupants using CDBG funds. The focus of this program is on the correc- tion of safety hazards. Between 2007 and 2013, 31 households were assisted through this program. The City recognizes the importance of maintaining and improving its existing housing stock. This program is proposed to be included in the 2014-2022 Housing Element as a new program - Residential Rehabilitation. Program 27: Neighborhood and Community Clean Up Campaigns Continue to encourage and sponsor neighborhood and community clean up campaigns for both public and private properties. The Environmental Services division orga- nizes an annual city-wide garage sale to encourage reuse of items which ordinarily might end up in the landfill. Also, the divi- sion organizes community creek clean-up campaigns. This is an ongoing program and is pro- posed to be included in the 2014-2022 Housing Element. Policy 10: Energy Conservation Program 28: Energy Conservation Opportunities Continue to enforce Title 24 requirements for energy conservation and evaluate utilizing suggestions as identified in the Environmental Resources/Sustainability element. The City continues to enforce Title 24.This is a function of the Building Division and is proposed to be included as a sepa- rate housing program in the 2014-2022 Housing Element. 666 B-174 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT TABLE 7.1: SUMMARY OF ACCOMPLISHMENTS OF 2007-2014 HOUSING ELEMENT IMPLEMENTATION PROGRAMS 2007-2014 Housing Element Goals, Policies and Programs 2007-2014 Housing Element Program Accomplishments Continued Appropriateness for 2014- 2022 Housing Element Program 29: Fee Waivers or Reduction for Energy Conservation Evaluate and implement the potential to provide incentives, such as waiving or reducing fees, for energy conservation improvements to residential units (exist- ing or new). The City adopted a Green Building Ordinance in 2013 to facilitate energy conservation efforts. Residential and nonresidential new construction, addition, and renovation are required to comply with the Green Building Ordinance. This program is proposed to be included and revised in the 2014-2022 Housing Element. Program 30: Energy Efficiency Audits Offer free energy efficiency audits for residential units under a contract with Acterra. Energy audits were offered through an ARRA grant by the Public Information Office through a contract with Actera. The ARRA program expired in 2012. This program is proposed to be removed from the 2014-2022 Housing Element. Program 31: Energy Conservation in Residential Development Continue to encourage energy efficient residential development and provide tech- nical assistance to developers who are interested in incorporating energy efficient design elements into their program. The City also adopted a Green Building Ordinance in 2012 to encourage energy conservation efforts. This program is proposed to be included in the 2014-2022 Housing Element. Goal D: Services for Special Needs Households Policy 11: Special Needs Households Program 32: Emergency Shelters Revise the Zoning Ordinance to allow permanent emergency shelter facilities in “BQ” Quasi-Public zoning districts as a permitted use. The City revised the Zoning Ordinance in 2010 to permit emergency shelters in the “BQ” Quasi-Public zoning districts as a permitted use. This program is proposed to be revised in the 2015-2023 Housing Element to remove the requirement that emergency shelters be located in churches. Program 33: Rotating Homeless Shelter Continue to support the rotating emer- gency shelter operated by West Valley Community Services West Valley Community Services (WVCS) successfully managed the Rotating Shelter Program for 18 years. The Rotating Shelter Program is now operat- ed through Faith in Action Silicon Valley. The City recognizes the critical need to provide homeless prevention and emer- gency shelter services for the homeless in the region. This program is proposed to be included in the 2014-2022 Housing Element. Program 34: Transitional and Supportive Housing Amend its zoning ordinance to com- ply with the requirements of SB2. Transitional and supportive housing will be treated as residential uses and be sub- ject to the same development standards and restrictions that apply to similar hous- ing types in the same zone. The City revised the Zoning Ordinance in 2010 to provide transition and supportive housing as a residential use to be permit- ted in similar manners as similar uses in the same zones. In 2008, the City contributed $800,000 to Maitri, a non-profit agency providing tran- sitional housing to victims of domestic violence, for the purchase of a four-plex in Cupertino. The project was completed in 2010. The Zoning Ordinance amendment pro- gram was completed in 2010. This pro- gram is proposed to be removed from the 2014-2022 Housing Element. 667 B-175 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT TABLE 7.1: SUMMARY OF ACCOMPLISHMENTS OF 2007-2014 HOUSING ELEMENT IMPLEMENTATION PROGRAMS 2007-2014 Housing Element Goals, Policies and Programs 2007-2014 Housing Element Program Accomplishments Continued Appropriateness for 2014- 2022 Housing Element Program 35: Catholic Social Services (Single Parents) Provide help, Catholic Social Services, to place single parents in shared housing situations through the Santa Clara County Urban County programs. Catholic Charities continues to provide the shared housing services through the Urban County CDBG program. The City will continue to provide a range of supportive services to its residents, especially those with special needs, in order to foster a suitable living environ- ment. A new program is proposed to be included and revised in the 2014-2022 Housing Element to reflect the range of services that may be supported by the City. Program 36: Flexible Parking Standards Consider granting reductions in off-street parking on a case-by-case basis for senior housing. The City continues to offer reductions in parking requirements on a case-by-case basis for senior housing. However, no new senior housing project was devel- oped between 2007 and 2013. This program is proposed to be included in the 2014-2022 Housing Element. Goal E: Equal Access to Housing Opportunities Policy 12: Housing Discrimination Program 37: Santa Clara County Fair Housing Consortium Distribute fair housing materials at all public facilities throughout the City and also has a booth at public events to dis- tribute materials. The City continues to participate in the Fair Housing Consortium. Fair housing materials distributed by various organiza- tions are available at public counters. This program is proposed to be included and revised in the 2014-2022 Housing Element Program 38: Fair Housing Outreach Continue to contract with ECHO Housing to provide fair housing outreach services. The City continues to contract with Eden Council for Hope and Opportunity (ECHO) to provide fair housing services, including outreach and education, coun- seling, and investigation of fair housing complaints. Also Project Sentinel pro- vides tenant/landlord mediation services under contract for the City. This program is proposed to be included in the 2014-2022 Housing Element as a new program - Fair Housing Services. Program 39: Reasonable Accommodation Ordinance Adopt a written reasonable accommoda- tion ordinance to provide persons with disabilities exceptions in zoning and land- use for housing. The City adopted the Reasonable Accommodation Ordinance in 2010 This program was completed in 2010 and is proposed to be removed from the 2014-2022 Housing Element. Goal F: Coordination with Local School Districts Policy 13: Coordination with Local School Districts Program 40: Coordination with Local School Districts Form a new committee of key staff from the City and the school districts to meet on a bi-monthly basis or as needed to review City planning initiatives, develop- ment proposals and School capital facili- ties and operating plans. City staff continues to meet with the school districts to discuss facility needs. However, no formal committee was established. The City recognizes the importance of addressing development impacts on the school districts. This program is pro- posed to be included and revised in the 2014-2022 Housing Element. In addition, the proposed new revised program will reflect coordination with other agencies, organizations, and neighboring jurisdic- tions to address regional housing issues. 668 B-176 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT TABLE 7.2: PROGRESS TOWARD RHNA, 2007-2013 Very Low Low ModerateAbove ModerateTotal RHNA 341 229 243 357 1170 Construction 25 23 27 587 662 % of RHNA 7.3%10.0%11.1%164.4%56.6% Sources: City of Cupertino, 2014; ABAG, 2014 7.3. Parcel-Specific Sites Inventory Table Local housing elements must identify sites that can accommodate the city’s share of the regional housing need as well as quantify the housing unit capacity of those sites. Moreover, the sites must be suitable, appropriate and available within the planning period to accommodate the housing needs of all income groups. The sites inventory must be presented on a parcel-specific basis. Cupertino’s sites inventory to meet the 2014-2022 RHNA allocation identifies a total of 1,386 units. Detailed information on each parcel included in the inventory is presented in Table 7.3. 669 B-177 Appendix B Housing Element Technical Report REVISED PUBLIC DRAFT TABLE 7.3: RESIDENTIAL SITES INVENTORY TO MEET THE 2014 RHNA Site Identifier APN General Pln Zoning Max Allowable Density (DUA) Size (Acres) Realistic Capacity 1: Oaks Shopping Center 326 27 040 C/O/RP(CG,Res)350.6419 1: Oaks Shopping Center 326 27 039 C/O/RP(CG,Res)355.40160 1: Oaks Shopping Center common area C/O/RP(CG,Res)350.7221 1: Oaks Shopping Center 326 27 041 C/O/RP(CG,Res)351.2035 2: Vallco Mall East and West 316 20 107 C/O/R P(Regional Shopping, OP, Res) 35 47.83600 2: Vallco Mall East and West 316 20 080 C/O/R 35 2: Vallco Mall East and West 316 20 082 C/O/R 35 2: Vallco Mall East and West 316 20 081 C/O/R 35 2: Vallco Mall East and West 316 20 101 C/O/R 35 2: Vallco Mall East and West 316 20 106 C/O/R 35 2: Vallco Mall East and West 316 20 104 C/O/R 35 2: Vallco Mall East and West 316 20 105 C/O/R 35 2: Vallco Mall East and West 316 20 100 C/O/R 35 2: Vallco Mall East and West 316 20 092 C/O/R 35 2: Vallco Mall East and West 316 20 099 C/O/R 35 2: Vallco Mall East and West 316 20 094 C/O/R 35 2: Vallco Mall East and West 316 20 095 C/O/R 35 3: The Hamptons 316 06 032 High Density P(Res)65 6.33 3443: The Hamptons 316 06 037 High Density P(Res)65 6.11 4: United Furniture (East)369 06 011 C/O/RP(CG,Res)250.6213 4: United Furniture (East)369 06 007 C/O/RP(CG,Res)250.6313 4: United Furniture (East)369 06 005 C/O/RP(CG,Res)250.398 4: United Furniture 369 06 002 C/O/RP(CG,Res)25 0.9220 4: United Furniture 369 06 003 C/O/RP(CG,Res)25 0.5311 4: United Furniture 369 06 004 C/O/RP(CG,Res)251.2927 4: United Furniture NAC/O/RP(CG,Res)25 0.5011 5: Glenbrook Apartments 326 27 036 Medium Density R3(10-20)20 11.62 935: Glenbrook Apartments 326 27 037 Medium Density R3(10-20)20 19.72 6: Barry Swenson Site 375 07 001 C/O/RP(CG,Res)250.5511 Total 90.881,386 Notea: Realistic capacity for each site reduces the maximum developable units by 15 percent. Residential capacity for Sites 3 and 5 reflect the net increase in units. Source: City of Cupertino, 2014 670 B-178 COMMUNITY VISION 2040 City of Cupertino REVISED PUBLIC DRAFT TABLE 7.3: RESIDENTIAL SITES INVENTORY TO MEET THE 2014 RHNA (CONN.) Site Identifier Infrastructure Capacity Current Use PDA Potential CEQA Streamlining 1: Oaks Shopping CenterYes Parking VTA PDAPlan EIR 1: Oaks Shopping CenterYes Shopping center VTA PDAPlan EIR 1: Oaks Shopping CenterYes Shopping center VTA PDAPlan EIR 1: Oaks Shopping CenterYes Parking VTA PDAPlan EIR 2: Vallco Mall East and West Yes Shopping center --Plan EIR 2: Vallco Mall East and WestYes Shopping center, parking --Plan EIR 2: Vallco Mall East and West Yes Shopping center, parking --Plan EIR 2: Vallco Mall East and WestYes Shopping center --Plan EIR 2: Vallco Mall East and WestYes Shopping center --Plan EIR 2: Vallco Mall East and WestYes Shopping center --Plan EIR 2: Vallco Mall East and WestYes Shopping center --Plan EIR 2: Vallco Mall East and WestYes Shopping center --Plan EIR 2: Vallco Mall East and WestYes Shopping center --Plan EIR 2: Vallco Mall East and WestYes Parking --Plan EIR 2: Vallco Mall East and WestYes Shopping center, parking --Plan EIR 2: Vallco Mall East and WestYes Shopping center, parking --Plan EIR 2: Vallco Mall East and WestYes Shopping center --Plan EIR 3: The Hamptons Yes Multi family housing ---- 3: The Hamptons Yes Multi family housing ---- 4: United Furniture (East)Yes Small commercial buildingsVTA PDAPlan EIR 4: United Furniture (East)Yes Gas Station VTA PDAPlan EIR 4: United Furniture (East)Yes Small commercial buildingsVTA PDAPlan EIR 4: United Furniture Yes Small commercial centerVTA PDAPlan EIR 4: United Furniture Yes Furniture store VTA PDAPlan EIR 4: United Furniture Yes Parking lot VTA PDAPlan EIR 4: United Furniture Yes ROW VTA PDAPlan EIR 5: Glenbrook ApartmentsYes Multi family housing --Plan EIR 5: Glenbrook ApartmentsYes Multi family housing --Plan EIR 6: Barry Swenson SiteYes Vacant VTA PDAPlan EIR Notea: Realistic capacity for each site reduces the maximum developable units by 15 percent. Residential capacity for Sites 3 and 5 reflect the net increase in units. Source: City of Cupertino, 2014 671 Prioritized list of Alternative Housing Element SitesExhibit HE-2 Site No.Name/Type Address Size Land Use Designation Proposed Zoning Priority Realistic Capacity 204 35 du/ac 187 35 du/ac 33 25 du/ac 27 25 du/ac 151 35 du/ac 96 25 du/ac Total Units on Alternate Housing Element Sites 698 Notes: * Low- Moderate* Low- Moderate* 6 Summerwinds & Granite Rock/ Property Owner Interest 1451, 1471, 1491 & 1505 S De Anza Blvd 4.57 Commercial/ Office/ Residential P(CG, Res) Low- Moderate 5 Homestead Lanes + Adjacency/ Workshop Proposed 20916, 20956, 20990 Homestead Rd 5.1 Commercial/ Residential P(CG, Res) 4 Loree Center/ Existing HE 10029 Judy Ave, 19060 Stevens Creek Blvd 1.29 Commercial/ Office/ Residential P(CG, Res) P(CG, Res)Low- Moderate*3 Shan Restaurant, Q-Mart & China Dance/ Existing HE and Lot Consolidation 20007, 20021 Stevens Creek Blvd & 10041 N. Blaney Ave 1.69 Commercial/ Office/ Residential Separate parcels on a Housing Element site shall be combined, master planned and developed under a Master Developer. Moderate* 2 Stevens Creek Office Center/ Property Owner Interest 20823 Stevens Creek Blvd 6.31 Commercial/ Residential P(CG, Res)Moderate 1 Marina Plaza/ Property Owner Interest 10118 Bandley Drive 6.86 Commercial/ Office/ Residential P(CG, Res) 672 ORDINANCE NO. 14-2124 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CUPERTINO REZONING CERTAIN SITES IN THE CITY FOR CONFORMANCE WITH THE GENERAL PLAN AND HOUSING ELEMENT SECTION I: PROJECT DESCRIPTION Application No: Z-2013-03 Applicant: City of Cupertino Location: Citywide SECTION II: RECITALS WHEREAS pursuant to City Council direction to initiate a project to replenish, reallocate and increase citywide development allocations in order to plan for anticipated future development activity while keeping with the community’s character, goals, and objectives and to consolidate development requests by several property owners for amendments to the General Plan, under a comprehensive community vision, and WHEREAS, pursuant to State Housing Law, the City Council has directed staff to update the Housing Element of the General Plan and make associated zoning amendments to comply with State Law; and WHEREAS, immediately prior to the Council’s consideration of this rezoning, and following the Commission’s recommendation, the Council adopted Resolution No. 14-211, adopting a General Plan Amendment covering the properties which are the subject of this rezoning ordinance; and WHEREAS, the rezoning will be consistent with the City's General Plan land use map, proposed uses and surrounding uses; and WHEREAS, the Rezoning application is part of the General Plan Amendment, Housing Element Update and Associated Rezoning, all as fully described and analyzed in the June 2014 General Plan Amendment, Housing Element Update, and Associated Rezoning Project Environmental Impact Report (“Draft EIR”) (State Clearinghouse No. 2014032007), as amended by text revisions in the August 2014 General Plan Amendment, Housing Element Update and Associated Rezoning Project EIR Response to Comments Document (“Response to Comments Document”) and the Supplemental Text Revisions dated October 8, 2014 (together, the “Final EIR”); WHEREAS, the Final EIR was presented to the Planning Commission on September 9, 2014 at a Planning Commission Study Session; and WHEREAS, the Final EIR was presented to the City Council on October 7, 2014 at a City Council Study Session; and WHEREAS, the necessary public notices have been given and the Planning Commission held public hearings on October 14, 2014 and October 20, 2014; 673 WHEREAS, based on substantial evidence in the administrative record, on October 20, 2014 the Planning Commission recommended that the City Council certify that the Final EIR has been completed in compliance with the California Environmental Quality Act, Public Resources Code Section 21000 et seq., and reflects the independent judgment and analysis of the City, adopt the Findings and Statement of Overriding Considerations, and implement all of the mitigation measures for the Project that are within the responsibility and jurisdiction of the City that are identified in Findings, in substantially similar form to the Resolution presented (Resolution 6760); and WHEREAS, on October 20, 2014, the Planning Commission recommended on a 4-0-1 (Takahashi absent) vote that the City Council adopt the General Plan Amendment (GPA-2013-01), in substantially similar form to the Resolution presented (Resolution no. 6761); authorize staff to forward the Draft Housing Element to the State Department of Housing and Community Development for review and certification (GPA-2013-02); approve the prioritized list of potential Housing Element sites in the event amendments are needed to the proposed Housing Element sites upon HCD review, in substantially similar form to the Resolution presented (Resolution no. 6762); approve the Zoning Map Amendments, Z-2013-03, in substantially similar form to the Resolution presented (Resolution no. 6763); approve the Municipal Code Amendments to make changes to conform to the General Plan and Housing Element and other clean up text edits (MCA-2014-01) in substantially similar form to the Resolution presented (Resolution no. 6764); approve the Specific Plan Amendments (SPA-2014-01) in substantially similar form to the Resolution presented (Resolution no. 6765); and WHEREAS, on November 10, 2014, upon due notice, the City Council has held at least one public hearing that the amendment to the Zoning map be granted and on the rest of the project approvals; and WHEREAS, after consideration of evidence contained in the entire administrative record, at the public hearing on November 10, 2014, the City Council adopted Resolution No. 14-210 certifying the EIR, adopting Findings and a Statement of Overriding Considerations, adopting Mitigation Measures, and adopting of a Mitigation Monitoring and Reporting Program. WHEREAS, prior to taking action on this Ordinance, the City Council has exercised its independent judgment in carefully considering the information in the EIR and finds that scope of this Ordinance falls within the previously certified EIR and that the rest of the amendments proposed in the Ordinance do not constitute a project under CEQA, are exempt and no further environmental review is required; and WHEREAS, the City Council finds the following: 1. That the proposed zoning is in accord with the Municipal Code and the City's Community Vision 2040 The proposed zoning is in conformance with the General Plan since the City Council adopted amendments to the General Plan. These changes are mere conforming changes to make the City’s zoning map conform to the land use. Additionally, many of the changes are to property that the City acquired and reflect the zoning designation prior to acquisition by the City. 674 2. The proposed zoning is in compliance with the provisions of the California Environmental Quality Act (CEQA). As set out more fully in the City of Cupertino City Council resolution certifying that the Final Environmental Impact Report (“Final EIR”) for the General Plan Amendment, Housing Element Update, and Associated Rezoning for the City of Cupertino (the “project”) was prepared in compliance with CEQA; and Adopting CEQA Findings and a Statement of Overriding Considerations, Mitigation Measures, and a Mitigation Monitoring and Reporting Program; the significant environmental effects of the project have been fully analyzed and disclosed in compliance with CEQA. All mitigation measures identified in the Final EIR have been adopted and incorporated into the project to reduce the impacts of new development to the extent feasible. 3. The site is physically suitable (including, but not limited to, access, provision of utilities, compatibility with adjoining land uses, and absence of physical constraints) for the requested zoning designation(s) and anticipated land use development(s). The sites being rezoned have access to utilities and are compatible with adjoining land uses. 4. The proposed zoning will promote orderly development of the City. The sites being rezoned will promote orderly development in the City by allowing similar land uses to be located compatibly. They also allow the easier applicability of zoning regulations. In some cases, zoning such as “Mini-storage” is being eliminated to allow the Light Industrial “ML” standards to be applicable to the current use at the site. 5. That the proposed zoning is not detrimental to the health, safety, peace, morals and general welfare of persons residing or working in the neighborhood of subject parcels. The proposed zoning is not detrimental to the health, safety, peace, morals and general welfare since these are conforming changes. Additionally, where health or safety impacts have been identified mitigation measures have been identified which would be applicable to any development on these sites. NOW, THEREFORE, BE IT ORDAINED AS FOLLOWS: That after careful consideration of the, maps, facts, exhibits, testimony, public comment, and other evidence submitted in this matter, the City Council based upon the findings described above, the public hearing record and subject to the following, finds: Section 1. Zoning Conformance Sites. That the property described in attached Exhibits Z-1 and Z-2 have a zoning designation as that shown and is incorporated into the Master Zoning Map (Exhibit Z-4) of the City of Cupertino; and Section 2. Priority Housing Sites. That the sites described in attached Exhibit Z-3 have a certain density if the property is shown in Table HE-5 of the adopted 2014-2022 Housing Element as a Priority Housing Site, or an alternative density if the property is not designated as a Priority Housing Site in the adopted 2014-2022 Housing Element, all as shown in Exhibit Z-3; and 675 Section 3. Planning Areas. That the property described in attached Exhibits Z-4a – Z-4f is the Zoning for the properties in each of the Planning Areas identified in the General Plan and the Master Zoning Map. Section 4. Effective Date. This Ordinance shall be effective on the date that the Final Housing Element for the City of Cupertino is adopted. SECTION III: CEQA REVIEW An Environmental Impact Report for the Subdivision was prepared in accordance with the California Environmental Quality Act (CEQA), Public Resources Code Section 21000 et seq. INTRODUCED at a meeting of the Cupertino City Council the 10th day of November 2014 and ENACTED at a regular meeting of the Cupertino City Council on this 18th day of November 2014 by the following vote: AYES: NOES: ABSENT: ABSTAIN: ATTEST: APPROVED: Grace Schmidt, City Clerk Gilbert Wong, Mayor, City of Cupertino 676 EXHIBIT Z-1 Assessor Parcel No. Existing Zoning New Zoning 326-15-110 R2-4.5 R3 326-15-111 R2-4.5 R3 326-15-108 R2-4.5 R3 326-15-073 R2-4.5 R3 326-49-036 R1 PR 326-49-040 R1-10 PR 359-25-049 R1-6 PR 357-20-027 ML-rc P(CN) 326-09-071 R3 PR 326-32-012 R2 R3 326-32-009 R2 R3 326-17-004 R1-10 PR 357-09-053 A PR 357-11-029 R1C PR 323-36-019 A1-43 BQ Property shown on Exhibit Z-2 P(MP) P(Res) 677 _________________________ ___ Planned Development/ Residential (P(Res)-70) Planned Development/ Planned Industrial Zone P(MP, Res) Conformance Site LEGEND________________ ___ REZONE .2 Acres_____ FROM: Planned Industrial Park, P(MP) TO: Planned Residential , P( Res) EXHIBIT Z-2 678 EXHIBIT Z-3 APN Current Zoning Zoning if selected as a Priority Housing Site Zoning if NOT selected as a Priority Housing Site Density if selected as a Priority Housing Site Density if NOT selected as a Priority Housing Site 316-06-032 P(Res – 70) P(Res) P(Res) 65 du/ac. 25 du/ac. 316-06-037 P(Res – 70) P(Res) P(Res) 65 du/ac. 25 du/ac. 316-20-080 P(CG) P(Regional Shopping, MP, Res) P(Regional Shopping) 35 du/ac. 35 du/ac. 316-20-081 P(CG) P(Regional Shopping, MP, Res) P(Regional Shopping) 35 du/ac. 35 du/ac. 316-20-082 P(CG) P(Regional Shopping, MP, Res) P(Regional Shopping) 35 du/ac. 35 du/ac. 316-20-101 P(Regional Shopping) P(Regional Shopping, MP, Res) P(Regional Shopping) 35 du/ac. 35 du/ac. 316-20-104 P(Regional Shopping) P(Regional Shopping, MP, Res) P(Regional Shopping) 35 du/ac. 35 du/ac. 316-20-105 P(Regional Shopping) P(Regional Shopping, MP, Res) P(Regional Shopping) 35 du/ac. 35 du/ac. 316-20-106 P(Regional Shopping) P(Regional Shopping, MP, Res) P(Regional Shopping) 35 du/ac. 35 du/ac. 316-20-107 P(Regional Shopping) P(Regional Shopping, MP, Res) P(Regional Shopping) 35 du/ac. 35 du/ac. 326-27-039 P(CG) P(CG, Res) P(CG) 35 du/ac. 25 du/ac. 326-27-040 P(CG) P(CG, Res) P(CG) 35 du/ac. 25 du/ac. 326-27-041 P(CG) P(CG, Res) P(CG) 35 du/ac. 25 du/ac. “Common Area” identified in Santa Clara County Assessor Office Book 326, Page 27 for Effective Roll Year 2014- 2015 surrounded by APN: 326-27-039, 326-27-040 & 326-27-041 P(CG) P(CG, Res) P(CG) 35 du/ac. 25 du/ac. 679 EXHIBIT Z-4 680 Partial South De Anza Blvd Conceptual Plan Area EXHIBIT- Z-4a. 681 EXHIBIT Z-4b LEGEND City of Cupertino Zoning Map – Homestead Special Area PR P(Res, 10-20, Mini-Stor) P(Res 10-20) 682 EXHIBIT Z‐4c.      City of Cupertino Zoning Map – North Vallco Special Area  LEGEND  683 EXHIBIT Z‐4d.      City of Cupertino Zoning Map – North De Anza Special Area  LEGEND  P(CG, ML, Res 4‐10)  684 EXHIBIT Z-4e. City of Cupertino Zoning Map – Monta Vista Special Area LEGEND P(Res 4.4-7.7) P(R1) 685 City of Cupertino Zoning Map – South De Anza Special Area LEGEND P(CG, Res 5-15) EXHIBIT Z-4f 686 ORDINANCE NO. 14-2125 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CUPERTINO AMENDING VARIOUS CHAPTERS IN TITLE 18 AND TITLE 19, INCLUDING THE AMENDMENT OF THE DENSITY BONUS ORDINANCE,THE ADDITION OF A CHAPTER IN TITLE 19 TO IMPLEMENT POLICIES IN THE GENERAL PLAN, THE ADDITION OF A CHAPTER IN TITLE 13 TO IMPROVE READABILITY WHEREAS pursuant to City Council direction to initiate a project to replenish, reallocate and increase citywide development allocations in order to plan for anticipated future development activity while keeping with the community’s character, goals, and objectives and to consolidate development requests by several property owners for amendments to the General Plan, under a comprehensive community vision, and WHEREAS, pursuant to State Housing Law, the City Council has directed staff to update the Housing Element of the General Plan and make associated zoning amendments to comply with State Law; and WHEREAS, immediately prior to the Council’s consideration of this rezoning, and following the Commission’s recommendation, the Council adopted Resolution No. 14-211, adopting a General Plan Amendment covering the properties which are the subject of this rezoning ordinance; and WHEREAS, the rezoning will be consistent with the City's General Plan land use map, proposed uses and surrounding uses; and WHEREAS, the Rezoning application is part of the General Plan Amendment, Housing Element Update and Associate Rezoning, all as fully described and analyzed in the June 2014 General Plan Amendment, Housing Element Update, and Associated Rezoning Project Environmental Impact Report (“Draft EIR”) (State Clearinghouse No. 2014032007), as amended by text revisions in the August 2014 General Plan Amendment, Housing Element Update and Associated Rezoning Project EIR Response to Comments Document (“Response to Comments Document”) and the Supplemental Text Revisions dated October 8, 2014 (together, the “Final EIR”); WHEREAS, the Final EIR was presented to the Planning Commission on September 9, 2014 at a Planning Commission Study Session; and WHEREAS, the Final EIR was presented to the City Council on October 7, 2014 at a City Council Study Session; and WHEREAS, the necessary public notices have been given as required by the procedural ordinances of the City of Cupertino and the Government Code, and the Planning Commission held public hearings on October 14, 2014 and October 20, 2014 to consider the project; and WHEREAS, based on substantial evidence in the administrative record, on October 20, 2014 the Planning Commission recommended that the City Council certify that the Final EIR has been completed in compliance with the California Environmental Quality Act, Public Resources Code Section 21000 et seq., and reflects the independent judgment and analysis of the City, 687 - 2 - adopt the Findings and Statement of Overriding Considerations, and implement all of the mitigation measures for the Project that are within the responsibility and jurisdiction of the City that are identified in Findings (Resolution 6760); and WHEREAS, on October 14, 2014, the Planning Commission recommended on a 4-0-1 (Takahashi absent) vote that the City Council adopt the General Plan Amendment (GPA-2013-01) (Resolution no. 6761); authorize staff to forward the Draft Housing Element to the State Department of Housing and Community Development for review and certification (GPA-2013- 02); approve the prioritized list of potential Housing Element sites in the event amendments are needed to the proposed Housing Element sites upon HCD review (Resolution no. 6762); approve the Zoning Map Amendments, Z-2014-03, in substantially similar form to the Resolution presented (Resolution no. 6763); approve the Municipal Code Amendments to make changes to conform to the General Plan and Housing Element and other clean up text edits (MCA-2014-01) (Resolution no. 6764); approve the Specific Plan Amendments, SPA-2014-01, in substantially similar form to the Resolution presented (Resolution no. 6765); and WHEREAS, on November 10, 2014, upon due notice, the City Council has held at least one public hearing to consider the amendments to the Municipal Code be granted; and WHEREAS, the City Council of the City of Cupertino is the decision-making body for this Ordinance; WHEREAS, after consideration of evidence contained in the entire administrative record, at the public hearing on November 10, 2014, the City Council adopted Resolution No. 14-210 certifying the EIR, adopting Findings and a Statement of Overriding Considerations, adopting Mitigation Measures, and adopting of a Mitigation Monitoring and Reporting Program. WHEREAS, prior to taking action on this Ordinance, the City Council has exercised its independent judgment in carefully considering the information in the EIR and finds that scope of this Ordinance falls within the previously certified EIR and that the rest of the amendments proposed in the Ordinance do not constitute a project under CEQA, are exempt and no further environmental review is required; and WHEREAS, it is the intent of the City Council, in enacting this Ordinance to make text amendments to improve conformity with State Law, improve readability, consistency and eliminate redundancies. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF CUPERTINO DOES ORDAIN AS FOLLOWS: Section 1. Title 13 of the Cupertino Municipal Code is hereby amended to include Chapter 13.08, Parkland Dedication, to be numbered and entitled to read as shown in Attachment I Section 2. Chapter 18.24 of Title 18 of the Cupertino Municipal Code is hereby amended to read as shown in Attachment II 688 - 3 - Section 3. Chapter 19.08 of Title 19 of the Cupertino Municipal Code is hereby amended to read as shown in Attachment III. Section 4. Chapter 19.12 of Title 19 of the Cupertino Municipal Code is hereby amended to read as shown in Attachment IV. Section 5. Chapter 19.20 of Title 19 of the Cupertino Municipal Code is hereby amended to read as shown in Attachment V. Section 6. Chapter 19.56 of Title 19 of the Cupertino Municipal Code is hereby amended to read as shown in Attachment VI. Section 7. Chapter 19.76 of Title 19 of the Cupertino Municipal Code is hereby amended to read as shown in Attachment VII. Section 8. Chapter 19.84 of Title 19 of the Cupertino Municipal Code is hereby amended to read as shown in Attachment VIII. Section 9. Chapter 19.144 of Title 19 of the Cupertino Municipal Code is hereby amended to read as shown in Attachment IX. Section 10. Title 19 of the Cupertino Municipal Code is hereby amended to include Chapter 19.172, Below Market Rate Housing Program, to be numbered and entitled to read as shown in Attachment X. Section 11. Severability. Should any provision of this Ordinance, or its application to any person or circumstance, be determined by a court of competent jurisdiction to be unlawful, unenforceable or otherwise void, that determination shall have no effect on any other provision of this Ordinance or the application of this Ordinance to any other person or circumstance and, to that end, the provisions hereof are severable. The City Council declares that it would have adopted this ordinance and each section, subsection, sentence, clause, phrase or portion thereof irrespective of the fact that any one or more sections, subsection, sentence clause, phrases or portions be declared valid or unconstitutional. Section 12. Effective Date. This Ordinance shall take effect and be in force thirty (30) days from and after adoption as provided by Government Code Section 36937. Section 13. Certification. The City Clerk shall certify to the passage and adoption of this Ordinance and shall give notice of its adoption as required by law. Pursuant to Government Code Section 36933, a summary of this Ordinance may be published and posted in lieu of publication and posting of the entire text. 689 - 4 - Section 14. Continuity. To the extent the provisions of this Ordinance are substantially the same as previous provisions of the Cupertino Municipal Code, these provisions shall be construed as continuations of those provisions and not as amendments of the earlier provisions. INTRODUCED at a regular meeting of the Cupertino City Council the 10th day of November, 2014 and ENACTED at a regular meeting of the Cupertino City Council on this ____ day of ___________ 2014 by the following vote: AYES: NOES: ABSENT: ABSTAIN: ATTEST: APPROVED: Grace Schmidt, City Clerk Gilbert Wong, Mayor, City of Cupertino 690 ATTACHMENT I CHAPTER 13.08 PARK LAND DEDICATION/FEE Section 13.08.010 Purpose. 13.08.020 Definitions 13.08.030 Requirements. 13.08.040 General Standard. 13.08.050 Parkland Dedication . 13.08.060 Fees in Lieu of Parkland Dedication. 13.08.070 Combination of Parkland Dedication and Fee. 13.08.080 Credit for Private Recreation or Open Space. 18.24.090 Credit for Existing Residential Units. 13.08.100 General Procedures. 13.08.010 Purpose. The purpose of this Chapter is to regulate, in the public interest, convenience, health, welfare and safety, the provision of park and recreational facilities upon development for which dedication of land and/or payment of a fee is required in accordance with the open space and conservation element of the adopted General Plan of the City of Cupertino, and any amendments. 13.08.020 Definitions “Dwelling unit” or “unit” means a room or group of rooms including living, sleeping, eating, cooking and sanitation facilities, constituting a separate and independent housekeeping unit, occupied or intended for occupancy on a non-transient basis and having not more than one kitchen. 13.08.030 Applicability. Upon development of a new dwelling unit, at the option of the City, a parkland dedication, or a payment of a fee in lieu thereof, or both, shall be required. 13.08.050 Parkland Dedication. A. Where the City determines that a park or recreational facility is to be located in whole or in part within the proposed development, land sufficient in topography and size shall be dedicated per the formula below. Parkland dedication/DU =  (Average number of persons/DU) x (Park Acreage Standard) 1000 persons B. The Park Acreage Standard is three acres of property for each one thousand persons. C. Parkland dedication based on development density: Table 13.08.050 indicates the average parkland dedication required per dwelling unit based on development density per the formula above (13.08.050.A). 691 - 6 - Table 13.08.050: Park Land Dedication Formula Table Density (DU/acre) Average number of persons/DU Average Parkland Dedication/DU (in acres) 0—5 3.5 .0105 5—10 2.0 .0060 10—20 2.0 .0060 20 + 1.8 .0054 10 + 1.8 .0054 Senior Citizen Housing Development 1.0 .0030 13.08.060 Fees in Lieu of Parkland Dedication. A. General Standard. 1. If the City determines that a parkland dedication is not required, a fee shall be paid in lieu thereof. 2. Fees in Lieu of Land–Fifty units or Less. If a proposed development contains fifty units or less, a fee in lieu of parkland dedication shall be paid, unless dedication is deemed appropriate and in the public interest by the City. B. Amount. The amount of the fee shall be equal to the fair market value of the land prescribed for dedication pursuant to Section 13.08.050. The fee shall be calculated as follows: In lieu fee = ((Average Parkland Dedication/DU)*(Net new dwelling units)*(Fair Market Value of land/acre)) C. Fair Market Value of land per acre. The Department of Public Works shall establish the fair market value of land within the City and update the value on an annual basis in the City’s Fee Schedule. The fair market value shall be determined by reference to comparable land within the City. As used herein, the term “comparable” means land of similar size and development potential as the land which would otherwise be dedicated. D. Use of Money. The money collected shall be paid to the Treasurer of the City or his or her authorized agent. Such money shall be placed in a special revenue fund which shall be known as the “park dedication in-lieu fee fund” and shall be used for all purposes allowed by State Law. 13.08.070 Combination of Parkland Dedication and Fee. A. The City shall determine whether it accepts parkland dedication, elects to require payment of a fee in lieu, or a combination of both a parkland dedication and a fee in lieu, upon consideration of the following: 1. Topography, geology, access and location of land in the development available for dedication; 2. Size and shape of the development and land available for dedication; 3. Feasibility of dedication; 692 - 7 - 4. Availability of previously acquired park property. B. The determination of the City as to whether land shall be dedicated, or whether a fee shall be charged, or a combination thereof, shall be final and conclusive. 13.08.080 Credit for Private Recreation or Open Space. A. Where private open space for park and recreational purposes is provided in a proposed development, fifty percent credit shall be given against the requirement of land dedication or payment of fees in lieu thereof, if the approval authority finds that it is in the public interest to do so and that all the standards in Section 13.08.080 B, below are met and findings in Section 13.08.080C can be made. B. That the open space for which credit is given complies with the following standards: 1. The total usable open space acreage for the development must be equivalent to the parkland dedication calculated pursuant to Section 13.08.050. 2. The open space must contain the mandatory elements and at least four of the six optional elements indicated in Table 13.08.080 below and meet the following criteria: a. The combined minimum acreage for a facility with a recreation center and children’s play apparatus area is 1.3 acres. b. The minimum combined acreage for a facility not including a recreation center or children’s play area is 1.5 acres. Table 13.08.080 – Mandatory and Optional Elements for private open space Minimum Acreage Mandatory Element Turfed playfield The playfield shall be a single unit of land which is generally level and free of physical barriers which would inhibit group play activities. .50 Optional Elements Children’s play apparatus area .15 Recreational community gardens .25 Family picnic area .25 Game court area .25 Swim pool (42’ x 75’ with adjacent deck and lawn areas) .25 Recreation center buildings and grounds .15 C. The approval authority may grant park credit for a combination of the above elements or a combination of the above elements and other recreation improvements that will meet the specific recreation needs of a specialized housing development, such as a senior housing development, with occupancy controlled via a covenant with the City named as a third party beneficiary. 693 - 8 - D. Findings. The approval authority shall adopt the following written findings and shall require the recordation of covenants running with the land to ensure that credited elements are maintained, before credit is given: 1. That yards, court areas, setbacks, decorative landscape areas normally associated with residential site design and other areas required to remain free and clear by zoning and building ordinances and regulations shall not be included in the computation of such private open space; 2. That such space is to be wholly or partially owned and maintained by the future residents of the development and that the private ownership and maintenance of the open space is adequately provided for by recorded written agreement, conveyance or restrictions; 3. That the use of the private open space is restricted for park and recreational purposes by recorded covenant, which runs with the land in favor of the future owners of property and which cannot be eliminated without the consent of the City or its successor; 4. That the proposed private open space is reasonably adaptable for use for park and recreational purposes, taking into consideration such factors as size, shape, topography, geology, access and location; 5. That the facilities proposed for private recreation or open space are in substantial conformance with General Plan policies. 18.24.090 Credit for Existing Dwelling Units. When dwelling units exist on the property where development is proposed, a credit shall be given against the requirement of land dedication or payment of fees in lieu thereof for the number of units existing. As used herein, the term “existing” refers to units which exist at the time of approval of the dwelling units or which were demolished within one year prior to the submittal of an application for development of the dwelling units. 13.08.100 General Procedures. A. At the time of approval of the dwelling units, the approval authority shall determine whether a parkland dedication or a fee in lieu thereof is required unless a parkland dedication or fee has already been provided. B. At the time of building permit application, land shall be dedicated to the City or the fee in lieu thereof shall be paid. C. Open space covenants for private park or recreational facilities shall be submitted to the City prior to approval of the building permits and shall be recorded simultaneously with the issuance of final occupancy. D. If parkland dedication is required, the design of the park shall be reviewed and approved and construction shall be completed prior to occupancy of the development. 694 ATTACHMENT II - 9 - CHAPTER 18.24: DEDICATIONS AND RESERVATIONS Section Article I. Dedication of Streets, Alleys, Rights-of-Way and Easements. 18.24.010 Dedication of Streets, Alleys, and Other Public Rights-of-way or Easements. Article II. Park Land Dedication. 18.24.020 Purpose. 18.24.030 Requirements. 18.24.040 General Standard. 18.24.050 Dedication of Land. 18.24.060 Fees in Lieu of Park Land Dedication. 18.24.070 Amount of Fee in Lieu of Park Land Dedication. 18.24.080 Subdividers Not Within General Plan. 18.24.090 Determination of Land or Fee. 18.24.100 Credit for Private Recreation or Open Space. 18.24.110 Credit for Existing Residential Units. 18.24.120 Procedure. 18.24.130 Commencement of Development. Article III. School Site Dedication. 18.24.140 General. 18.24.150 Procedure. 18.24.160 Payments to Subdivider for School Site Dedication. 18.24.170 Exemptions. Article IV. Reservations. 18.24.180 General. 18.24.190 Standards for Reservation of Land. 18.24.200 Procedure. 18.24.210 Payment to Subdivider. 18.24.220 Termination. Article V. Waiver of Direct Street Access. 18.24.230 Waiver of Direct Street Access. 695 - 10 - Article I. Dedication of Streets, Alleys, Rights-of-Way and Easements. 18.24.010 Dedication of Streets, Alleys, and Other Public Rights-of-way or Easements. A. As a condition of approval of a final map or parcel map, the subdivider shall dedicate or make an irrevocable offer of dedication of all parcels of land within the subdivision that are needed for streets and alleys, including access rights and abutters’ rights; drainage; public utility easements; bicycle paths, transit facilities, solar access easements, park land, fire stations, libraries, access to public resources and other public easements as required. B. Improvements shall be in accordance with Chapter 18.32, Subdivision Improvements, of this title. Article II. Park Land Dedication. 18.24.020 Purpose. This section is enacted pursuant to the authority granted by the Government Code. The park and recreational facilities for which dedication of land and/or payment of a fee is required by this chapter are in accordance with the open space and conservation element of the adopted General Plan of the City of Cupertino, and any amendments. 18.24.030 Requirements. A. As a condition of approval of a final subdivision map or parcel map, the subdivider shall dedicate land, pay a fee in lieu thereof, or both, at the option of the City, for park or recreational purposes at the time and according to the standards and formula contained in this chapter. B. The provisions of this chapter are not applicable to the following land use categories: 1. Commercial or industrial subdivisions; 2. Condominium conversion projects or stock cooperatives which consist of the subdivision of air space in an existing apartment building which is more than five years old when no new dwelling units are added; 3. Convalescent hospitals and similar dependent care facilities. 18.24.040 General Standard. The Parkland Dedication standard shall be as identified in the City’s General Plan and Chapter 13.08. 18.24.050 Dedication of Land. A. Where a park or recreational facility has been designated in the open space and conservation element of the General Plan of the City, and is to be located in whole or in part within the proposed subdivision to serve the immediate and future need of the residents of the subdivision, the subdivider shall dedicate land for a local park sufficient in size and topography to serve the residents of the subdivision. B. The formula for determining acreage to be dedicated shall be pursuant to Section 13.08.050. 696 - 11 - 18.24.060 Fees in Lieu of Land Dedication. A. General Formula. If there is no park or recreation facility designated in the open space and conservation element of the General Plan to be located in whole or in part within the proposed subdivision to serve the immediate and future needs of the residents of the subdivision, the subdivider shall, in lieu of dedicating land, pay a fee pursuant to the formula in Section 13.08.060. B. Fees in Lieu of Land–Fifty Parcels or Less. If the proposed subdivision contains fifty parcels or less, the subdivider shall pay a fee in lieu of dedication, unless dedication is deemed appropriate and in the public interest by the City. . C. Fair Market Value of land per acre. The Fair Market Value of land per acre shall be established pursuant to Section 13.08.050C. D. Use of Money. The money collected shall be paid and used pursuant to Section 13.08.060D. 18.24.070 Criteria for Requiring Both Dedication and Fee. In subdivisions of over fifty parcels, the subdivider shall both dedicate land and pay a fee in lieu thereof in accordance with the following formula: A. When only a portion of the land to be subdivided is proposed in the open space and conservation element of the General Plan as the site for a local park, the portion shall be dedicated for local park purposes and a fee computed pursuant to the provisions of Section 18.24.060, shall be paid for any additional land that would have been required to be dedicated pursuant to Section 18.24.050, Dedication of Land. B. When a major part of the local park or recreational site has already been acquired by the City and only a small portion of land is needed from the subdivision to complete the site, the remaining portion shall be dedicated and a fee computed pursuant to the provisions of Section 18.24.060, shall be paid in an amount equal to the value of the land which would otherwise have been required to be dedicated pursuant to Section 18.24.050, Dedication of Land, the fees to be used for the improvement of the existing park and recreational facility or for the improvement of other local parks and recreational facilities in the area serving the subdivision. 18.24.080 Subdividers Not Within General Plan. Where the proposed subdivision lies within an area not included but to be included within the City’s General Plan, the subdivider shall dedicate land, pay a fee in lieu, or both, in accordance with the adopted park and recreational principles and standards of the City’s General Plan and in accordance with the provisions of this chapter. 18.24.090 Determination of Land or Fee. A. If the relationship between a proposed subdivision containing fifty parcels or more and the open space and conservation element is unclear, the City Council shall determine whether it 697 - 12 - accepts land dedication or elects to require payment of a fee, by consideration of the standards identified in Section 13.08.070. B. The determination of the City as to whether land shall be dedicated, or whether a fee shall be charged, or a combination thereof, shall be final and conclusive. 18.24.100 Credit for Private Recreation or Open Space. Where private open space for park and recreational purposes is provided in a proposed subdivision, a credit shall be given against the requirement of land dedication or payment of fees in lieu thereof, pursuant to requirements of Section 13.08.080. 18.24.110 Credit for Existing Residential Units. Where any lot or lots of a proposed subdivision contains existing residential units, a credit shall be given against the requirement of land dedication or payment of fees in lieu thereof for each lot which contains residential unit or units. As used herein, the term “existing” refers to a residential unit or units which exist at the time of the recordation of a final map or which were demolished within one year prior of the tentative map application. 18.24.120 Procedure. A. At the time of approval of the tentative subdivision map, the City Council shall determine pursuant to Section 18.24.100 the land to be dedicated and/or fees to be paid by the subdivider. B. At the time of the filing of the final subdivision map, the subdivider shall dedicate the land/or pay the fees as previously determined by the City Council. C. Open space covenants for private park or recreational facilities shall be submitted to the City prior to approval of the final subdivision map and shall be recorded simultaneously with the final subdivision map. 18.24.130 Commencement of Development. At the time of approval of the final subdivision map, the City Council shall specify when development of the park or recreational facilities shall be commenced. Article III. School Site Dedication. 18.24.140 General. Unless otherwise prohibited by law, as a condition of approval of a final subdivision map, a subdivider who develops or completes the development of one or more subdivisions within a school district shall dedicate to the school district such lands as the City Council shall deem to be necessary for the purpose of constructing thereon schools necessary to assure the residents of the subdivision adequate elementary school service. 18.24.150 Procedure. The requirement of dedication shall be imposed at the time of approval of the tentative map. If within thirty days after the requirement of dedication is imposed by the City the school district 698 - 13 - does not offer to enter into a binding commitment with the subdivider to accept the dedication, the requirement shall be automatically terminated. The required dedication may be made any time before, concurrently with, or up to sixty days after the filing of the final map on any portion of the subdivision. 18.24.160 Payments to Subdivider for School Site Dedication. The school district shall, if it accepts the dedication, repay to the subdivider or his or her successors the original cost to the subdivider of the dedicated land, plus a sum equal to the total of the following amounts: A. The cost of any improvements to the dedicated land since acquisition by the subdivider; B. The taxes assessed against the dedicated land from the date of the school district’s offer to enter into the binding commitment to accept the dedication; C. Any other costs incurred by the subdivider in maintenance of such dedicated land, including interest costs incurred on any loan covering such land. 18.24.170 Exemptions. The provisions of this article shall not be applicable to a subdivider who has owned the land being subdivided for more than ten years prior to the filing of the tentative maps. Article IV. Reservations. 18.24.180 General. As a condition of approval of a map, the subdivider shall reserve sites, appropriate in area and location, for parks, recreational facilities, fire stations, libraries or other public uses according to the standards and formula contained in this article. 18.24.190 Standards for Reservation of Land. Where a park, recreational facility, fire station, library, or other public use is shown on an adopted specific plan or adopted general plan containing a community facilities element, recreation and parks element and/or a public building element, the subdivider may be required by the City to reserve sites as so determined by the City or County in accordance with the definite principles and standards contained in the above specific plan or General Plan. The reserved area must be of such size and shape as to permit the balance of the property within which the reservation is located to develop in an orderly and efficient manner. The amount of land to be reserved shall not make development of the remaining land held by the subdivider economically unfeasible. The reserved area shall conform to the adopted specific plan or General Plan and shall be in such multiples of streets and parcels as to permit an efficient division of the reserved area in the event that it is not acquired within the prescribed period. 18.24.200 Procedure. The public agency for whose benefit an area has been reserved shall, at the time of approval of the final map or parcel map, enter into a binding agreement to acquire reserved area within two years after the completion and acceptance of all improvements, unless the period of time is extended by mutual agreement. 699 - 14 - 18.24.210 Payment to Subdivider. The purchase price shall be the market value at the time of the filing of the tentative map plus the taxes against such reserved area from the date of the reservation and any other costs incurred by the subdivider in the maintenance of the reserved area, including interest costs incurred on any loan covering the reserved area. 18.24.220 Termination. If the public agency for whose benefit an area has been reserved does not enter into a binding agreement, the reservation of the area shall automatically terminate. Article V. Waiver of Direct Street Access. 18.24.230 Waiver of Direct Street Access. A. The City may require as a condition of approval of any subdivision the waiver of direct access rights to proposed or existing streets from any property within the subdivision and abutting thereon. B. Any waiver shall become effective in accordance with its provisions and shall be contained in the owner’s certificate of the final map or parcel map. 700 ATTACHMENT III - 15 - CHAPTER 19.08: DEFINITIONS Section 19.08.010 Purpose and Applicability. 19.08.020 General Rules for Construction of Language. 19.08.030 Definitions. 19.08.010 Purpose and Applicability. The purpose of this chapter is to promote consistency and precision in the interpretation of zoning regulations. The meaning and construction of words and phrases defined in this chapter shall apply throughout the zoning regulations, except where the context of such word or phrases clearly indicates a different meaning or construction. 19.08.020 General Rules for Construction of Language. The following general rules of construction shall apply to the text of the zoning regulations: A. The particular shall control the general. B. In case of any difference of meaning or implication between the text of any provision and any caption or illustration, the text shall control. C. The word “shall” is always mandatory and not discretionary. The word “may” is discretionary. D. References in the masculine and feminine genders are interchangeable. E. Words used in the singular include the plural, and the plural includes the singular, unless the context clearly indicates the contrary. F. The words “activities” and “facilities” include any part thereof. G. Unless the context clearly indicates to the contrary, the following conjunctions shall be interpreted as follows: 1. “And” indicates that all connected items or provisions shall apply; 2. “Or” indicates that the connected items or provisions may apply singly or in any combination; 3. “Either . . . or” indicates that the connected items or provisions shall apply singly but not in combination. H. The words “lot” and “parcel” are interchangeable. I. The word “building” includes the word “structure.” J. All public officials, bodies, and agencies to which reference is made are those of the City unless otherwise indicated. K. “City” means the City of Cupertino. 701 - 16 - 19.08.030 Definitions. Throughout this title the following words and phrases shall have the meanings ascribed in this section. A. “A” Definitions: “Abandon” means to cease or discontinue a use or activity without intent to resume, but excluding temporary or short-term interruptions to a use or activity during periods of remodeling, maintaining, or otherwise improving or rearranging a facility, or during normal periods of vacation or seasonal closure. “Abutting” means having property or district lines in common. “Accessory building” means a building which is incidental to and customarily associated with a specific principal use or facility and which meets the applicable conditions set forth in Chapter 19.100, Accessory Buildings/Structures. “Accessory structure” means a subordinate structure, the use of which is purely incidental to that of the main building and which shall not contain living or sleeping quarters. Examples include a deck, tennis courts, trellis or car shelter. Fences eight feet or less are excluded. “Addition” means any construction which increases the size of a building or facility in terms of site coverage, height, length, width, or gross floor area ratio.“Adjacent property” means property that abuts the subject property, including property whose only contiguity to the subject site is a single point and property directly opposite the subject property and located across a street. “Adult bookstore” means a building or portion thereof used by an establishment having as a substantial or significant portion of its stock in trade for sale to the public or certain members thereof, books, magazines, and other publications which are distinguished or characterized by their emphasis on matter depicting, describing or relating to “specified sexual activities” or “specified anatomical areas,” as hereinafter defined. “Adult cabaret” means a building or portion thereof used for dancing purposes thereof or area used for presentation or exhibition or featuring of topless or bottomless dancers, strippers, male or female impersonators or similar entertainers, for observations by patrons or customers. “Adult motion picture theater” means a building or portion thereof or area, open or enclosed, used for the presentation of motion pictures distinguished or characterized by an emphasis on matter depicting, describing or relating to “specified sexual activities” or “specified anatomical areas,” as hereinafter defined, for observation by patrons or customers. “Advertising statuary” means a structure or device of any kind or character for outdoor advertising purposes which displays or promotes a particular product or service, but without name identification. “Aerial” means a stationary transmitting and/or receiving wireless communication device consisting of one or any combination of the elements listed below: 702 - 17 - 1. “Antenna” means a horizontal or vertical element or array, panel or dish that may be attached to a mast or a tower for the purpose of transmitting or receiving radio or microwave frequency signals. 2. “Mast” means a vertical element consisting of a tube or rod which supports an antenna. 3. “Tower” means a vertical framework of cross elements which supports either an antenna, mast or both. 4. “Guy wires” means wires necessary to insure the safety and stability of an antenna, mast or both. “Affordable units” means housing units in which the rent does not exceed thirty percent of the HUD income limits for lower and very low income households for the Santa Clara County Metropolitan Statistical Area, adjusted for household size. “Affordable housing cost” means the amount set forth in the Health and Safety Code Section 50052.5, as may be amended. “Affordable rent” means the amount set forth in the Health and Safety Code Section 50053, as may be amended. “Agriculture” means the tilling of the soil, the raising of crops, horticulture, agriculture, livestock farming, dairying, or animal husbandry, including slaughterhouses, fertilizer yards, bone yard, or plants for the reduction of animal matter or any other similar use. “Alley” means a public or private vehicular way less than thirty feet in width affording a secondary means of vehicular access to abutting property. “Alteration”, for purposes of the Sign Ordinance, means any permanent change to a sign. “Alteration” means any construction or physical change in the arrangement of rooms or the supporting members of a building or structure, or change in the relative position of buildings or structures on a site, or substantial change in appearances of any building or structure. 1. “Incidental alteration” means any alteration to interior partitions or interior supporting members of a structure which does not increase the structural strength of the structure; any alteration to electrical, plumbing, heating, air conditioning, ventilating, or other utility services, fixtures, or appliances; any addition, closing, or change in size of doors or windows in the exterior walls; or any replacement of a building facade which does not increase the structural strength of the structure. 2. “Structural alteration” means any alteration not deemed an incidental alteration. “Amusement park” means a commercial facility which supplies various forms of indoor and outdoor entertainment and refreshments. Animal: 1. Animal, Adult. “Adult animal” means any animal four months of age or older. 2. Animal, Large. “Large animal” means any equine, bovine, sheep, goat or swine or similar domestic or wild animal, as determined by the Planning Commission. 3. Animal, Small. “Small animal” means animals which are commonly found in single-family residential areas such as chickens, ducks, geese, rabbits, dogs, cats, etc. 703 - 18 - “Animal care” means a use providing grooming, housing, medical care, or other services to animals, including veterinary services, animal hospitals, overnight or short-term boarding ancillary to veterinary care, indoor or outdoor kennels, and similar services. “Apartment” means a room or a suite of two or more rooms which is designed for, intended for, and occupied by one family doing its cooking there. “Apartment house” means a building designed and used to house three or more families, living independently of each other. “Apartment project” means a rental housing development consisting of two or more dwelling units. “Approval Body” means the Director of Community Development and his/her designee, the Planning Commission or City Council depending upon context. “Architectural feature” means any part or appurtenance of a building or structure which is not a portion of the living area of the building or structure. Examples include: cornices, canopies, eaves, awnings, fireplaces, or projecting window elements. Patio covers or any projection of the floor area shall not constitute an architectural projection. “Architectural projection,” for purposes of the Sign Ordinance, means any permanent extension from the structure of a building, including the likes of canopies, awnings and fascia. “Atrium” means a courtyard completely enclosed by walls and/or fences. “Attic” means an area between the ceiling and roof of a structure, which is unconditioned (not heated or cooled) and uninhabitable. “Automotive service station” means a use providing gasoline, oil, tires, small parts and accessories, and services incidental thereto, for automobiles, light trucks, and similar motor vehicles. Automotive maintenance and repair (minor) may be conducted on the site. The sale of food or grocery items on the same site is prohibited except for soft drinks and snack foods, either from automatic vending machines or from shelves. The sale of alcoholic beverages on the site is governed by Chapter 19.132, Concurrent Sale of Alcoholic Beverages and Gasoline. “Automotive repair and maintenance (minor)” means the supplying of routine automotive services such as lubrication, engine tune-ups, smog certificates, servicing of tires, brakes, batteries and similar accessories, and minor repairs involving engine accessories. Any repair which requires the engine, drive train, transmission assembly, exhaust system, or drive train parts to be removed from a motor vehicle or requires the removal of internal parts shall not be considered minor. Body and paint shop operations are not minor repairs or maintenance. “Average slope” means the ratio between vertical and horizontal distance expressed in percent; the mathematical expression is based upon the formula described below: S =   I x L x 100 A S = Average slope of ground in percent; L = Combined length in feet of all contours on parcel; I = Contour interval in feet; A = Area of parcel in square feet. 704 - 19 - B. “B” Definitions: “Banner” means a temporary display consisting of fabric, canvas, plastic or paper material which is attached to a building, vehicle, pole or other form of support. “Basement” means any floor below the first story in a building that is fully submerged below grade except for lightwells required for light, ventilation and emergency egress. A basement may have a maximum exterior wall height of two feet between natural grade and ceiling. “Block” means any lot or group of contiguous lots bounded on all sides by streets, railroad rights-of-way, or waterways, and not traversed by any street, railroad right-of-way or waterway. “Boarding house” means any building used for the renting of rooms or providing of table board for from three to five persons, inclusive, over the age of sixteen years, who are not members of the same family. “Building” means any structure used or intended for supporting or sheltering any use or occupancy when any portion of a building is completely separated from every other portion by a “Fire Barrier” as defined by the California Building Code, then each portion shall be deemed to be a separate building. 1. “Attached building” means buildings which are structurally connected by any structural members or wall, excluding decks, patios or fences. “Building coverage” means that portion of the net lot area encompassed within the outermost wall line which defines a building enclosure. “Building frontage” means the length or the surface of the building wall which faces, and is visible to the general public from, a private or public right-of-way or driveway. “Business” or “commerce” means the purchase, sale or other transaction involving the handling or disposition of any article, substance or commodity for profit or livelihood, including, in addition, office buildings, offices, shops for the sale of personal services, garages, outdoor advertising signs and structures, hotels and motels, and recreational and amusement enterprises conducted for profit. “Business or trade school” means a use, except a college or university, providing education or training in business, commerce, language, or similar activity or pursuit, and not otherwise defined as a home occupation. C. “C” Definitions: “Canopy” means any roof-like structure, either attached to another structure or freestanding, or any extension of a roof line, constructed for the purpose of protection from the elements or aesthetic purposes in connection with outdoor living. “Car shelter” means a roofed structure or a part of a building not enclosed by walls, intended and designed to accommodate one or more vehicles. “Caretaker” means a person or persons employed for the purpose of protecting the principal use of the property or structure. 705 - 20 - “Centerline” means the centerline as established by the County Surveyor of Santa Clara County, the City Engineer, or by the State Division of Highways of the State of California. “Changeable copy sign” means any sign, or portion, which provides for each manual changes to the visible message without changing structural surfaces, including the likes of theater marquees and gasoline service station price signs, but excluding electronic readerboard signs and signs which display the current time or temperature. “Change of face” means any changes to the letter style, size, color, background, or message. “Change of use” means the replacement of an existing use by a new use, or a change in the nature of an existing use, but not including a change in ownership, tenancy or management where the previous nature of the use, line of business, or other function is substantially unchanged. “Child” means a person who is under eighteen years of age. “Child day care facility” means a facility, licensed by the State or County, which provides non- medical care to children in need of personal services, supervision, or assistance essential for sustaining the activities of daily living or for the protection of the individual on less than a twenty-four-hour basis. Child day care facility includes day care centers, employer sponsored child-care centers and family day care homes. “Church” means a use providing facilities for organized religious worship and religious education incidental thereto, but excluding a private educational facility. A property tax exemption obtained pursuant to Section 3(f) of Article XIII of the Constitution of the State of California and Section 206 of the Revenue and Taxation Code of the State of California, or successor legislation, constitutes prima facie evidence that such use is a church as defined in this section. “College” or “university” means an educational institution of higher learning which offers a course of studies designed to culminate in the issuance of a degree or defined by Section 94110 of the Education Code of the State of California, or successor legislation. “Collocation” means the placement of aerials and other facilities belonging to two or more communication service providers on a single mast or building. “Commercial recreation” means a use providing recreation, amusement, or entertainment services, including theaters, bowling lanes, billiard parlors, skating arenas, and similar services, operated on a private or for-profit basis, but excluding uses defined as outdoor recreation services. “Community center” means a place, structure, area, or other facility used for and providing religious, fraternal, social and/or recreational programs generally open to the public and designated to accommodate and serve a significant segment of the community. “Commercial district,” for purposes of the Sign Ordinance, means an area of land designated for commercial use in the current Cupertino General Plan. “Common interest development” means the following, all definitions of which are based upon Civil Code Section 4100 or subsequent amendments: 706 - 21 - 1. A condominium project, 2. A community apartment project, 3. A stock cooperative, or 4. A planned development. “Community organization” means a nonprofit organization based in the City and whose activities benefit the City, its residents, employees, or businesses. “Concession” means a benefit offered by the City to facilitate construction of eligible projects as defined by the provisions of this chapter. Benefits may include, but are not limited to, priority processing, fee deferments and waivers, granting of variances, and relaxation of otherwise applicable permit conditions or other concessions required by law. “Condominium conversion” or “Conversion” means a change in the type of ownership of a parcel (or parcels) of land, together with the existing attached structures, to that defined as a common interest development, regardless of the present or prior use of such land and structures and whether substantial improvements have been made or are to be made to such structure. “Condominium project” or “project” includes the real property and any structures thereon, or any structures to be constructed thereon, which are to be divided into condominium ownership. “Condominium units” or “units” means the individual spaces within a condominium project owned as individual estates. “Congregate residence” means any building or portion which contains facilities for living, sleeping and sanitation, as required by the California Building Code and may include facilities for eating and cooking for occupancies other than a family. A congregate residence may be a shelter, convent or monastery but does not include jails, hospitals, nursing homes, hotels or lodging houses. “Convalescent facility” means a use other than a residential care home providing inpatient services for persons requiring medical attention, but not providing surgical or emergency medical services. “Convenience market” means a use or activity that includes the retail sale of food, beverages, and small personal convenience items, including sale of food in disposable containers primarily for off-premises consumption, and typically found in establishments with long or late hours of operation and in relatively small buildings, but excluding delicatessens and other specialty food shops and establishments which have a sizable assortment of fresh fruits, vegetables, and fresh- cut meats. “Corner triangle” means a triangular-shaped area bounded by the following, unless deemed otherwise by the City Engineer: 1. The intersection of the tangential extension of front and street side property lines as formed by the intersection of two public rights-of-way abutting the said property lines; and 707 - 22 - 2. The third boundary of the triangular-shaped area shall be a line connecting the front and side property lines at a distance of forty feet from the intersection of the tangential extension of front and side property lines. “Corner triangle,” for purposes of the Sign Ordinance, means a triangular-shaped area of land adjacent to an intersection of public rights-of-way, as further defined in Cupertino Standard Details Drawings Nos. 7-2 and 7-4. (See Appendix A, Cupertino Standard Detail 7-2; Corner Triangle–Controlled Intersections, and B, Cupertino Standard Detail 7-4; Corner Triangle– Uncontrolled Intersections for details.) “Court” means an open, unoccupied space, other than a yard, on the same lot with a building or buildings and which is bounded on two or more sides by such building or buildings, including the open space in a house court or court apartment providing access. “Covered parking” means a carport or garage that provides full overhead protection from the elements with ordinary roof coverings. Canvas, lath, fiberglass and vegetation are not ordinarily roof coverings and cannot be used in providing a covered parking space. D. “D” Definitions: “Day care center” means any child day care facility, licensed by the State or County, other than a family day care home, and includes infant centers, preschools, and extended day care facilities. Day Care Home, Family. “Family day care home” means a home, licensed by the State or County, which regularly provides care, protection and supervision for fourteen or fewer children, in the provider’s own home, for periods of less than twenty-four hours per day, while the parents or guardian are away, and includes the following: 1. “Large-family day care home,” which means a home which provides family day care for seven to fourteen children, inclusive, including children under the age of ten years who reside at the home, as set forth in the California Health and Safety Code Section 1597.465; 2. “Small-family day care home,” which means a home which provides family day care to eight or fewer children, including children under the age of ten years who resides at the home, as set forth in the California Health and Safety Code Section 1597.44. “Decorative statuary,” for purposes of the Sign Ordinance, means any structure or device of any kind or character placed solely for aesthetic purposes and not to promote any product or service. “Demonstrated safety” means a condition requiring protection from the threat of danger, harm, or loss, including but not limited to the steepness of a roadway or driveway that may create a hazardous parking situation in front of a gate. “Demonstrated security” means a condition requiring protection from the potential threat of danger, harm or loss, including but not limited to a location that is isolated and invisible from public view or that has experienced documented burglary, theft, vandalism or trespassing incidences. 708 - 23 - “Density bonus” means a density increase over the otherwise maximum allowable residential density in accordance with the provisions of Chapter 19.56. as of the date of the project application. “Developer” means the owner or subdivider with a controlling proprietary interest in the proposed common interest development, or the person or organization making application, or a qualified applicant who has entered into a development agreement pursuant to the procedures specified in Chapter 19.144. “Development agreement” means a development agreement enacted by legislation between the City and a qualified applicant pursuant to Government Code Sections 65864 through 65869.5. "Development standard" means a site or construction regulation, including, but not limited to, a setback requirement, a floor area ratio, an onsite open-space requirement, or a parking ratio that applies to a development pursuant to any ordinance, general plan element, specific plan, charter, or other local condition, law, policy, resolution, or regulation. “District” means a portion of the property within the City within which certain uses of land, premises and buildings are permitted and certain other uses of land, premises and buildings are prohibited, and within which certain yards and other open spaces are required and certain building site areas are established for buildings, all as set forth and specified in this title. “Drinking establishment” means an activity that is primarily devoted to the selling of alcoholic beverages for consumption on the premises. “Drive-through establishment” means an activity where a portion of retailing or the provision of service can be conducted without requiring the customer to leave his or her car. “Driveway” means any driveway that provides direct access to a public or private street. Driveway, Curved. “Curved driveway” means a driveway with access to the front property line which enters the garage from the side at an angle of sixty degrees or greater to the front curbline and which contains a functional twenty-foot-deep parking area that does not overhang the front property line. “Duplex” means a building, on a lot under one ownership, containing not more than two kitchens, designed and used to house not more than two families living independently of each other. “Dwelling unit” means a room or group of rooms including living, sleeping, eating, cooking and sanitation facilities, constituting a separate and independent housekeeping unit, occupied or intended for occupancy by one family on a nontransient basis and having not more than one kitchen. E. “E” Definitions: “Economically feasible” means when a housing project can be built with a reasonable rate of return. The housing developer’s financial ability to build the project shall not be a factor. 709 - 24 - Emergency Shelter: “Emergency shelter, rotating” means a facility that provides temporary housing with minimal supportive services and meets criteria in Section 19.76.030(2). “Emergency shelter, permanent” means a permanently operated facility that provides temporary housing with minimal supportive services and meets criteria in Section19.76.030(3). “Employee Housing” means accommodations for employees as defined by Health and Safety Code 17008, as may be amended. “Enclosed” means a covered space fully surrounded by walls, including windows, doors and similar openings or architectural features, or an open space of less than one hundred square feet fully surrounded by a building or walls exceeding eight feet in height. “Entry feature” means a structural element, which leads to an entry door. “Equestrian center” means a facility for the shelter, display, exhibition, keeping, exercise or riding of horses, ponies or mules, or vehicles drawn by such animals, with related pasture lands, corrals and trails. “Equipment yard” means a use providing for maintenance, servicing or storage of motor vehicles, equipment or supplies; or for the dispatching of service vehicles; or distribution of supplies or construction materials required in connection with a business activity, public utility service, transportation service, or similar activity, including but not limited to, a construction material yard, corporation yard, vehicular service center or similar use. F. “F” Definitions: “Facility” means a structure, building or other physical contrivance or object. 1. “Accessory facility” means a facility which is incidental to, and customarily associated with a specified principal facility and which meets the applicable conditions set forth in Chapter 19.80. 2. “Noncomplying facility” means a facility which is in violation of any of the site development regulations or other regulations established by this title, but was lawfully existing on October 10, 1955, or any amendment to this title, or the application of any district to the property involved by reason of which the adoption or application the facility becomes noncomplying. (For the definition for “nonconforming use” see the definition “use” in this chapter.) 3. “Principal facilities” means a main building or other facility which is designed and constructed for or occupied by a principal use. “Family” means an individual or group of persons living together who constitute a bona fide single housekeeping unit in a dwelling unit. “Family” shall not be construed to include a fraternity, sorority, club, or other group of persons occupying a hotel, lodging house, or institution of any kind. 710 - 25 - “Fence” means a man-made structure which is designed, intended or used to protect, defend or obscure the interior property of the owner from the view, trespass or passage of others upon that property. “Fence height” means the vertical distance from the highest point of the fence (excluding post caps) to the finish grade adjoining the fence. In a case where the finish grade is different for each side of the fence, the grade with the highest elevation shall be utilized in determining the fence height. “First floor” means that portion of a structure less than or equal to twenty feet in height, through which a vertical line extending from the highest point of exterior construction to the appropriate adjoining grade, passes through one story. “Flag” means any fabric, banner, or bunting containing distinctive colors, patterns, or symbols, used as a symbol of a government, political subdivision, or other entity. “Floor area” means the total area of all floors of a building measured to the outside surfaces of exterior walls, and including the following: 1. Halls; 2. Base of stairwells; 3. Base of elevator shafts; 4. Services and mechanical equipment rooms; 5. Interior building area above fifteen feet in height between any floor level and the ceiling above; 6. Basements with lightwells that do not conform to Section 19.28.060I; 7. In all zones except residential, permanently roofed, but either partially enclosed or unenclosed building features used for sales, service, display, storage or similar uses. “Floor area” shall not include the following: 1. Basements with lightwells that conform to Section 19.28.060I; 2. Lightwells; 3. Attic areas; 4. Parking facilities, other than residential garages, accessory to a permitted conditional use and located on the same site; 5. Roofed arcades, plazas, walkways, porches, breezeways, porticos, courts and similar features not substantially enclosed by exterior walls. “Floor area ratio” means the maximum ratio of gross floor area on a site to the total site area. “Foot-lambert” means a unit measurement of the brightness of light transmitted through or reflected from an object or surface. “Freeway” means any public roadway so designated by the State of California. “Front wall” means the wall of a building or other structure nearest the street upon which the building faces, but excluding certain architectural features as defined in this chapter. G. “G” Definitions: “Garage” means an accessory building (completely enclosed) or an attached building used primarily for the storage of motor vehicles. “Gasoline service station” means any place of business which offers for sale any motor vehicle fuel to the public. “Grade” or “finished grade” means the lowest point of adjacent ground elevation of the finished surface of the ground paving, or sidewalk, excluding areas where grade has been raised by means of a berm, planter box, or similar landscaping feature, unless required for 711 - 26 - drainage, within the area between the building and the property line, or when the property line is more than five feet from the building, between the building and a line five feet from the building. “Gross lot area” means the horizontal area included within the property lines of a site plus the street area bounded by the street centerline up to thirty feet distant from the property line, the street right-of-way line and the extended side yard to the street centerline. “Guest room” means a room which is intended, arranged or designed to be occupied by occasional visitors or nonpaying guests of the occupants of the dwelling unit in which the room is located, and which contains no kitchen facilities. H. “H” Definitions: “Habitable floor” means the horizontal space between a floor area of at least seventy square feet and the ceiling height measuring at least seven feet six inches above it, except for a kitchen which shall have a ceiling height not less than seven feet above the floor. “Habitable space” means space in a structure for living, sleeping, eating or cooking. Bathrooms, toilet compartment, closets, halls, storage or utility space and similar areas are not considered habitable space. “Heavy equipment” means any mechanical or motorized device that is not a vehicle or a commercial vehicle as defined in 19.08.030(V), including, but not limited to, a backhoe, cement mixer, crane, ditch witch, dozer, earth mover, generator, grader, tractor or any similar device. “Height” means a vertical distance measured parallel to the natural grade to the highest point of exterior construction, exclusive of chimneys, antennas or other appurtenances, except that entry features are measured to the top of the wall plate. Height restriction shall be established by establishing a line parallel to the natural grade. “Height”, for purposes of the Accessory Buildings/ Structures, encompasses the entire wall plane nearest the property line, including roof, eaves, and any portion of the foundation visible above the adjoining finished grade. “Home occupation” means a business, profession, occupation or trade activity which is performed by the resident(s) of a dwelling unit within that dwelling unit, or a yard area or garage associated with that dwelling unit, or a yard area or garage associated with that unit, for purposes of generating income, by means of the Height Limit for Entry Features 712 - 27 - manufacture, and/or sale of goods and/or services, but which activity is clearly incidental to the use of the dwelling for residential purposes. “Hospital” means a facility for providing medical, psychiatric or surgical services for sick or injured persons, primarily on an inpatient basis, and including ancillary facilities for outpatient and emergency treatment, diagnostic services, training, research, administration, and service to patients, employees or visitors. “Hotel” means a facility containing rooms or groups of rooms, generally without individual kitchen facilities, used or intended to be used by temporary overnight occupants, whether on a transient or residential occupancy basis, and whether or not eating facilities are available on the premises. Hotel includes motel, motor hotel, tourist court, or similar use, but does not include mobilehome parks or similar uses. “Household pets” means small animals commonly found in residential areas such as chickens, ducks, geese, rabbits, dogs, and cats, but excluding animals such as any bovine or equine animal, or any goat, sheep or swine. This title does not regulate the keeping of small household pets, such as fish, birds or hamsters, which is incidental to any permitted use. However, no animal including household pets may be kept, maintained and/or raised for commercial purposes except where permitted with required permits. “Household type” means whether the occupants of the housing units are very low income, lower income, moderate income, or senior citizens. “Housing development” means, for the purposes of Chapter 19.56, Density Bonus, a development project for five or more residential units. For the purposes of that chapter, "housing development" also includes a subdivision or common interest development, approved by the City that consists of residential units or unimproved residential lots and either a project to substantially rehabilitate and convert an existing commercial building to residential use or the substantial rehabilitation of an existing multifamily dwelling, as defined in Government Code Section 65863.4(d), where the result of the rehabilitation would be a net increase in available residential units. I. “I” Definitions: “Industrial district,” for purposes of the Sign Ordinance, means all ML districts and any other zoning classifications which are consistent with the industrial designation of the Cupertino general plan. “Institutional district,” for purposes of the Sign Ordinance, means all BQ, PR, FP, and BA districts and other zoning classifications and uses which are considered institutional in nature and are consistent with the institutional or quasi-public designation of the general plan. J. “J” Definitions: “Junkyard” means the use of more than two hundred square feet of the area of any lot for the storage or keeping of junk, including scrap metals or other scrap material, and/or for the dismantling or wrecking of automobiles or other vehicles or machinery. 713 - 28 - K. “K” Definitions: “Kitchen” means an area in habitable space used for the preparation of food and including at least three of the following: 1. Cooking appliance(s) or provision for a cooking appliance (such as 220V outlets, gas connections and space for appliances between counters; 2. Counter; 3. Refrigerator; and 4. Sink. L. “L” Definitions: “Landscaping” means an area devoted to or developed and maintained with native or exotic planting, lawn, ground cover, gardens, trees, shrubs, and other plant materials, decorative outdoor landscape elements, pools, fountains, water features, paved or decorated surfaces of rock, stone, brick, block or similar material (excluding driveways, parking, loading or storage areas), and sculptural elements. “Late evening activities” means an activity which maintains any hours of operation during the period of eleven p.m. to seven a.m. “Legal substandard lot” means any parcel of land or lot recorded and legally created by the County or City prior to March 17, 1980, which lot or parcel is of less area than required in the zone; or lots or parcels of record which are reduced to a substandard lot size as a result of required street dedication unless otherwise provided in the City of Cupertino General Plan. The owner of a legally created, substandard property which is less than six thousand square feet but equal to or greater than five thousand square feet may utilize such parcel for residential purposes. The owner of a legally created parcel of less than five thousand square feet may also develop the site as a single-family residential building site if it can be demonstrated that the property was not under the same ownership as any contiguous property on the same street frontage as of or after July 1, 1984. “Lightwell” means an excavated area required by the Uniform Building Code to provide emergency egress, light and ventilation for below grade rooms. “Liquor store” means a use requiring a State of California “off-sale general license” (sale for off- site consumption of wine, beer and/or hard liquor) and having fifty percent or more of the total dollar sales accounted for by beverage covered under the off-sale general license. “Living space” means habitable space and sanitation. “Loading space” means an area used for loading or unloading of goods from a vehicle in connection with the use of the site on which such space is located. “Lodging” means the furnishing of rooms or groups of rooms within a dwelling unit or an accessory building to persons other than members of the family residence in the dwelling unit, for overnight occupancy on a residential occupancy basis, whether or not meals are provided to the person. Lodging shall be subject to the residential density requirements of the district in which the use is located. “Lodging unit” means a room or group of rooms not including a kitchen, used or intended for use by overnight occupants as a single unit, whether located in a hotel or a dwelling unit providing lodging where designed or used for occupancy by more than two persons; each two- 714 - 29 - person capacity shall be deemed a separate lodging unit for the purpose of determining residential density; each two lodging units shall be considered the equivalent of one dwelling unit. “Lot” means a parcel or portion of land separated from other parcels or portions by description, as on a subdivision or record of survey map, or by metes and bounds, for purpose of sale, lease or separate use. 1. “Corner lot” means a lot situated at the intersection of two or more streets, or bounded on two or more adjacent sides by street lines. 2. “Flag lot” means a lot having access to a street by means of a private driveway or parcel of land not otherwise meeting the requirement of this title for lot width. 3. “Interior lot” means a lot other than a corner lot. 4. “Key lot” means the first lot to the rear of a corner lot, the front line of which is a continuation of the side line of the corner lot, and fronting on the street which intersects or intercepts the street on which the corner lot fronts. “Lot area” means the area of a lot measured horizontally between boundary lot lines, but excluding a portion of a flag lot providing access to a street and lying between a front lot line and the street, and excluding any portion of a lot within the lines of any natural watercourse, river, stream, creek, waterway, channel or flood control or drainage easement and excluding any portion of a lot within a street right-of-way whether acquired in fee, easement or otherwise. “Lot coverage” means the following: 1. “Single-family residential use” means the total land area within a site that is covered by buildings, including all projections, but excluding ground-level paving, landscape features, lightwells, and open recreational facilities. 2. “All other uses except single-family residential” means the total land area within a site that is covered by buildings, excluding all projections, ground-level paving, landscape features, and open recreational facilities. “Lot depth” means the horizontal distance from the midpoint of the front lot line to the midpoint of the rear lot line, or to the most distant point on any other lot line where there is no clear rear lot line. “Lot line” means any boundary of a lot. 1. “Front lot line” means on an interior lot, the lot line abutting a street, or on a corner lot, the shorter lot line abutting a street, or on a flag lot, the interior lot line most parallel to and nearest the street from which access is obtained. 2. “Interior lot line” means any lot line not abutting a street. 3. “Rear lot line” means the lot line not intersecting a front lot line which is most distant from and the most closely parallel to the front lot line. A lot bounded by only three lot lines will not have a rear lot line. 4. “Side lot line” means any lot line which is not a front or rear lot line. 5. “Street lot line” means any lot line abutting a street. 715 - 30 - “Lot of record” means a lot which is part of a subdivision recorded in the office of the County Recorder, or a lot or parcel described by metes and bounds which has been recorded. “Lot width” means the horizontal distance between side lot lines, measured at the required front setback line. “Lower-income household” means a household whose gross income does not exceed that established by Health and Safety Code Section 50079.5, as may be amended. M. “M” Definitions: “Major renovation,” for purposes of Chapter 19.116, Conversions of Apartment Projects to Common Interest Development, means any renovation for which an expenditure of more than one thousand dollars was made. “Major repair,” for purposes of Chapter 19.116, Conversions of Apartment Projects to Common Interest Development, means any repair for which an expenditure of more than one thousand dollars was made. “Manufacturing” means a use engaged in the manufacture, predominantly from previously prepared materials, of finished products or parts, including processing fabrication, assembly, treatment, packaging of products, but excluding basic industrial processing of extracted or raw materials, processes utilizing inflammable or explosive material (i.e., materials which ignite easily under normal manufacturing conditions), and processes which create hazardous or commonly recognized offensive conditions. “Massage” means any method of pressure on or friction against or stroking, kneading, rubbing, tapping, pounding, vibrating or stimulating the external parts of the human body with the hands or with any mechanical or electrical apparatus or other appliances or devices with or without such supplementary aides as rubbing alcohol, liniment, antiseptic, oil, powder, cream, lotion, ointment or other similar preparations. “Massage parlor” means a building or portion thereof, or a place where massage is administered for compensation or from which a massage business or service for compensation is operated which is not exempted or regulated by the Massage Establishment Ordinance as contained in Title 9, Health and Sanitation of the Cupertino Municipal Code, Chapter 9.06. “Maximum allowable residential density,” for purposes of Chapter 19.56, Density Bonus, means the maximum density allowed under the zoning ordinance and land use element of the general plan. For purposes of that Chapter, if the maximum density allowed under the zoning ordinance is inconsistent with the density allowed under the land use element of the general plan, the general plan density shall prevail. “Minor change” means an alteration or modification of an existing plan, development or project which is substantially inferior in bulk, degree or importance to the overall dimension and design of the plan, development or project with no change proposed for the use of the land in question, no change proposed in the character of the structure or structures involved, and no variance required. 716 - 31 - “Mobilehome” means a vehicle, other than a motor vehicle, designed or used as semi- permanent housing, designed for human habitation, for carrying persons and property on its own structure, and for being drawn by a motor vehicle, and shall include a trailer coach. “Mobilehome park” means any area or tract of land where lots are sold, rented, or held out for rent to one or more owners or users of mobilehomes, excluding travel-trailers, for the purpose of permanent or semi-permanent housing. “Moderate income household” means a household whose gross income does not exceed that established by Section 50093 of the Health and Safety Code, as may be amended. “Multiple-family use” means the use of a parcel for three or more dwelling units which may be in the same building or in separate buildings on the same parcel. N. “N” Definitions: “Natural grade” means the contour of the land prior to improvements or development, unless otherwise established by a city approved grading plan that is part of a subdivision map approval. “Nightclub” means an establishment providing alcoholic beverage service and late evening (past eleven p.m.) entertainment, with or without food service. O. “O” Definitions: “Office” means: 1. “Administrative or executive offices” including those pertaining to the management of office operations or the direction of enterprise but not including merchandising or sales services. 2. “Medical office” means a use providing consultation, diagnosis, therapeutic, preventative or corrective personal treatment services by doctors, dentists, medical and dental laboratories, and similar practitioners of medical and healing arts for humans, licensed for such practice by the State of California and including services related to medical research, testing and analysis. 3. “Professional offices” such as those pertaining to the practice of the professions and arts including, but not limited to, accounting, architecture, dentistry, design, engineering, including associated testing and prototype development, but excluding product manufacturing and/or assembly, law and medicine, but not including sale of drugs or prescriptions except as incidental to the principal uses and where there is external evidence of such incidental use. 4. “Office district,” for purposes of the Sign Ordinance, means those buildings or groups of buildings for which the permitted uses are professional offices, is within an OA or OP zone or which are designated for offices on the general plan. “Offset” means the indentation or projection of a wall plane. “Open” means a space on the ground or on the roof of a structure, uncovered and unenclosed. 717 - 32 - “Organizational documents” means the declaration of restrictions, articles of incorporation, bylaws and any contracts for the maintenance, management or operation of all or any part of a common interest development. “Outdoor recreation use” means a privately owned or operated use providing facilities for outdoor recreation activities, including golf, tennis, swimming, riding or other outdoor sport or recreation, operated predominantly in the open, except for accessory or incidental enclosed services or facilities. P. “P” Definitions: “Park” means any open space, reservation, playground, swimming pool, golf course, recreation center, or any other area in the City owned or used by the City or County and devoted to active or passive recreations. “Parking area” means an unroofed, paved area, delineated by painted or similar markings, intended and designed to accommodate one or more vehicles. “Parking facility” means an area on a lot or within a building, or both, including one or more parking spaces, together with driveways, aisles, turning and maneuvering areas, clearances and similar features, and meeting the requirements established by this title. Parking facility includes parking lots, garages and parking structures. 1. “Temporary parking facility” means parking lots which are not required under this title and which are intended as interim improvements of property subject to removal at a later date. “Parking space” means an area on a lot or within a building, used or intended for use for parking a motor vehicle, having permanent means of access to and from a public street or alley independently of any other parking space, and located in a parking facility meeting the requirements established by this title. Parking space is equivalent to the term “parking stall” and does not include driveways, aisles or other features comprising a parking facility as previously defined in this chapter. “Pennant” means any lightweight plastic, fabric, or other material, whether or not containing a message of any kind, suspended from a rope, wire, or string, usually in a series, designed to move in the wind. “Permit” means a permit issued by the City Council, Planning Commission, Design Review Committee, Director of Community Development, or any other decision body as empowered by the Cupertino Municipal Code, approving architecture, site improvements, buildings, structures, land and/or uses. Permits may include but shall not be limited to Administrative Approvals, Two-story Permits, Minor Residential Permits, Architectural and Site Approvals, Development Permits, Conditional Use Permits, Exceptions, Variances or Subdivision Maps. “Person” means an individual, group, partnership, firm, association, corporation, trust, governmental agency, governmental official, administrative body, or tribunal or any other form of business or legal entity. 718 - 33 - “Personal fitness training center” means a facility providing space and equipment, with or without supervision, for group or individual athletic development, increased skill development in sports activity, or rehabilitative therapy for athletic injury. “Perspective drawing” means a rendering of a three-dimensional view depicting the height, width, depth, and position of a proposed structure in relation to surrounding properties and structures when viewed from street level. “Picnic area” means a facility providing tables and cooking devices for preparation and consumption of meals out of doors or within an unenclosed shelter structure. “Practice range” means a facility providing controlled access to fixed or movable objects which are used to test and measure accuracy of discharge from a weapon. “Private educational facility” means a privately owned school, including schools owned and operated by religious organizations, offering instruction in the several branches of learning and study required to be taught in the public schools by the Education Code of the State of California. “Project improvements” means all public road improvements, undergrounding utility improvements, and improvements to the on-site utility networks as required by the City of Cupertino for a common interest development. “Projection” means architectural elements, not part of the main building support, that cantilevers from a single building wall or roof, involving no supports to the ground other than the one building wall from which the element projects. “Promotional Device” means any sign, display, fixture, placard, vehicle or structure that uses color, form, graphic, symbol, illumination or writing to advertise a special event or the opening of a new business. “Property” means real property which includes land, that which is affixed to the land, and that which is incidental or appurtenant to the land as defined in Civil Code Sections 658 through 662. 1. Property, Adjoining. “Adjoining property” means any unit of real property, excluding lands used as public streets, sharing one or more common points with another property. “Provider” means a person who operates a child day care home and is licensed by the State of California. “Public dancehall” is a building or portion used for dancing purposes to and in which the general public is admitted and permitted to dance, upon payment of any fee other than compensation, or upon payment of a charge for admission, or for which tickets or other devices are sold, or in which a charge is made for the privilege of dancing with any other person employed for such purpose by the operator of the establishment, including but not limited to taxi dances, but excluding restaurants, hotel rooms and nightclubs in which the dancing is incidental only to other entertainment. 719 - 34 - Q. “Q” Definitions: “Qualified applicant” is a person who has a legal or equitable interest in real property which is the subject of a development agreement, determined pursuant to Section 19.116.070. Qualified applicant includes an authorized agent. “Qualifying resident,” for purposes of Chapter 19.56, Density Bonus, of this Code, means a senior citizen or other persons eligible to reside in a senior citizen housing development. R. “R” Definitions: “Recreational open space” means open space within a common interest development (exclusive of required front setback areas) which shall be used exclusively for leisure and recreational purposes, for the use and enjoyment of occupants (and their visitors) of units on the project and to which such occupants (and their visitors) have the right of use and enjoyment. Accessory structures such as swimming pools, recreational buildings and landscaped areas may be included as open space. “Recyclable materials” means discards or waste materials that may be separated or mixed, collected and processed, and used as raw materials for new products. For purposes of this chapter, recyclable material does not include hazardous materials. “Recycling center” means a facility for the collection and/or processing of recyclable materials. Recycling center does not include storage containers or processing activity located on the premises of a commercial or manufacturing use and use solely for the recycling of material generated by that business or manufacturer. 1. “Recycling center, Certified” or “Certified Processor” means a recycling facility certified by the California Department of Conservation as meeting the requirements of the California Beverage Container Recycling and Litter Reduction Act of 1986. 2. “Recycling center, Mobile” means an automobile, truck, trailer or van licensed by the Department of Motor Vehicles, which is used for the collection of recyclable material. A mobile recycling center also means the bins, boxes or containers transported by trucks, vans, or trailers and used for the collection of recyclable materials. A mobile recycling center may consist of an enclosed vehicle such as box cab or enclosed semi-trailer or an open vehicle such as a flatbed trailer with bins or boxes to contain recyclable materials. “Recycling facilities” may include the following: 1. “Collection facility” means a facility for the acceptance (donation, redemption or sale) of recyclable materials from the public. Such a facility does not use power-driven processing equipment except as indicated in Chapter 19.108, Beverage Container Redemption and Recycling Centers. Collection facilities may include the following: a. Reverse vending machine(s); b. Small collection facilities which occupy an area of not more than five hundred square feet, and may include: i. A mobile recycling unit, 720 - 35 - ii. Bulk reverse vending machine or a grouping of reverse vending machines occupying more than fifty square feet, iii. Kiosk type units and bulk vending machines, iv. Unattended containers placed for the donation of recyclable materials; c. Large collection facilities which may occupy an area of more than five hundred square feet, or is on a separate property not appurtenant to a host use, and may include permanent structures. 2. “Processing facility” means a building or enclosed space use for the collection and processing of recyclable materials. Processing means the preparation of material for efficient shipment or to an end-user’s specifications, by such means as baling, briquetting, compacting, flattening, grinding, crushing, mechanical sorting, shredding, cleaning, and remanufacturing. Processing facility includes the following: a. A light processing facility occupies an area of under forty-five thousand square feet of gross collection, processing and storage area and has up to two outbound truck shipments per day. Light processing facilities are limited to baling, briquetting, crushing, compacting, grinding, shredding and sorting of source-separated recyclable materials and repairing of reusable materials sufficient to qualify as a certified processing facility. A light processing facility shall not shred, compact, or bale ferrous metals other than food and beverage containers. b. A heavy processing facility is any processing facility other than a light processing facility. “Religious institution” means a seminary, retreat, monastery, conference center, or similar use for the conduct of religious activities including accessory housing incidental thereto, but excluding a private educational facility. Any use for which a property tax exemption has been obtained pursuant to Section 3(f) of Article XIII of the Constitution of the State of California and Section 206 of the Revenue and Taxation Code of the State of California, or successor legislation, or which is used in connection with any church which has received such an exemption, shall be prima facie presumed to be a religious institution. “Research and development” means a use engaged in study, design, analysis and experimental development of products, processes or services, including incidental manufacturing of products or provisions of services to others. “Residential care facility” means a building or portion designed or used for the purpose of providing twenty-four-hour-a-day nonmedical residential living accommodations pursuant to the Uniform Building, Housing and Fire Codes, in exchange for payment of money or other consideration, where the duration of tenancy is determined, in whole or in part, by the individual resident’s participation in group or individual activities such as counseling, recovery planning, medical or therapeutic assistance. Residential care facility includes, but is not limited to, health facilities as defined in California Health and Safety Code (H&SC Section 1250 et seq.), community care facilities (H&SC Section 1500 et seq.), residential care facilities for the elderly (H&SC Section 1569 et seq.) or facilities for the mentally disordered or otherwise handicapped 721 - 36 - (W&I Code Section 5000 et seq.), alcoholism or drug abuse recovery or treatment facilities (H&SC Section 11384.11), and other similar care facilities. “Residential district,” for purposes of the Sign Ordinance, means the R1, RHS, R2, R3, R1C, A, and A1 zoning classifications which are consistent with the residential designation of the Cupertino general plan. Restaurant: 1. Restaurant, Fast-Food. “Fast-food restaurant” means a retail food service establishment in which prepared foods or beverages are served or sold on or in disposable containers, including those establishments where a substantial portion of the patrons may serve themselves and may consume the food and beverages off-site. A separate bar facility for serving alcoholic beverages is not permitted. Any area, tables or rooms reserved for serving alcoholic beverages shall be considered a separate bar facility. Specialty food stores, such as ice cream stores, bakeries or shops, shall not be considered fast-food restaurants. 2. Restaurant, Full Service. “Full-service restaurant” means any restaurant which is not a fast- food restaurant. Alcoholic beverages may be served with meals at a customer’s dining table; however, a separate bar facility for serving alcoholic beverages is not permitted without a use permit. “Reverse vending machine(s)” means an automated mechanical device which accepts one or more types of empty beverage containers, including, but not limited to aluminum cans, glass and plastic bottles, and issues a cash refund or a redeemable credit slip with a value not less than the containers redemption value, as determined by the State. A reverse vending machine may sort and process containers mechanically provided that the entire process is enclosed within the machine. In order to accept and temporarily store all three container types in a proportion commensurate with their relative redemption rates, and to meet the requirements of certification as a recycling center, multiple grouping of reverse vending machines may be necessary. 1. A bulk reverse vending machine is a reverse vending machine that is larger than fifty square feet; is designed to accept more than one container at a time; and will pay by weight instead of by container. “S” Definitions: “Screened” means shielded, concealed, and effectively hidden from view at an elevation of up to eight feet above ground level on adjoining parcels, or from adjoining parcels, within ten feet of a lot line, by a fence, wall, hedge, berm, or similar structure, architectural or landscape feature, or combination thereof. “Second dwelling unit” means an attached or a detached residential dwelling unit which provides complete independent living facilities for one or more persons. It shall include permanent provisions for living, sleeping, eating, cooking and sanitation on the same parcel as the single-family dwelling is situated. 722 - 37 - “Senior citizens” means: 1. Persons at least sixty-two years of age; or 2. Persons at least fifty-five years of age in a senior citizen housing development, in accordance with State and federal law. “Senior citizen housing development” means a housing development with at least thirty-five dwelling units as defined in the Civil Code Section 51.3, or a mobilehome park that limits residency based on age requirements for housing for older persons pursuant to Section 798.76 or 799.5 of the Civil Code, as may be amended. “Setback line” means a line within a lot parallel to a corresponding lot line, which is the boundary of any specified front, side or rear yard, or the boundary of any public right-of-way or private road, whether acquired in fee, easement, or otherwise, or a line otherwise established to govern the location of buildings, structures or uses. Where no minimum front, side or rear yards are specified, the setback line shall be coterminous with the corresponding lot line. Setback Area, Required. “Required setback area” means open space, unoccupied and unobstructed from the ground upward, except as provided in this title, between the lot line and the setback line on the same parcel. 1. Setback Area, Required Front Yard. “Required front-yard setback area” means the setback area extending across the front of a lot between the front lot line and the setback line. Front yards shall be measured either by a line at right angles to the front lot line, or by a radial line in the case of a curved front lot line, except flag lots which is the area extending across the full extent of the buildable portion of the flag lot measured from the property line which is parallel to and nearest the street line and at which point the lot width equals a minimum of sixty feet. The Director of Community Development shall have the discretion to modify the provisions of this definition when it improves the design relationship of the proposed buildings to adjacent buildings or parcels. 2. Setback Area, Required Rear Yard. “Required rear-yard setback area” means the area extending across the full width of the lot between the rear lot line and the nearest line or point of the main building. 3. Setback Area, Required Side Yard. “Required side-yard setback area” means the area between the side lot line and the nearest line of a building, and extending from the front setback line to the rear setback line. “Shopping center” means a group of commercial establishments, planned, developed, owned or managed as a unit, with off-street parking provided on the parcel. “Shopping center,” for purposes of the Sign Ordinance, means a retail entity encompassing three or more tenants within a single building or group of buildings, but within which individual business located in defined tenant spaces are owned and managed separately from the shopping center management. “Sidewalk site triangle” is a triangular shaped area described in Cupertino Standard Detail 7-6. (See Appendix C, Cupertino Standard Detail; Sidewalk Site Triangle (Sidewalk Clearance at Driveway) 723 - 38 - “Sign” means any device, fixture, placard, or structure that uses any color, form, graphic, illumination, symbol, or writing to advertise, announce the purpose of, or identify the purpose of a person or entity, to communicate information of any kind to the public. 1. “Animated sign” means any sign which projects action, motion or the illusion thereof, changes intensity of illumination or changes colors, including the likes of balloons, banners and flags, and blowing or air-powered attractions, but excluding electronic readerboard signs and signs that display the current time or temperature. 2. “Blade sign” means a pedestrian oriented sign, adjacent to a pedestrian walkway or sidewalk, attached to a building wall, marquee, awning or arcade with the exposed face of the sign in a plane perpendicular to the plane of the building wall. 3. “Development Identification Sign” means a ground sign at the major entry to a residential development with twenty units or more meant to identify the name and address of the development. 4. “Directional sign” means any sign which primarily displays directions to a particular area, location or site. 5. “Directory sign” means any outdoor listing of occupants of a building or group of buildings. 6. “Electronic readerboard sign” means an electronic sign intended for a periodically-changing advertising message. 7. “Freeway oriented sign” means any sign which is located within six hundred sixty feet and visible from a freeway right-of-way as defined by Section 5200 of the California Business and Professions Code. 8. “Garage sale signs” means any sign used for advertising a garage or patio sale as defined in Chapter 5.16 of the Cupertino Municipal Code. 9. “Ground sign” means any sign permanently affixed to the ground and not supported by a building structure. The height of thesign shall be measured from the grade of the adjoining closest sidewalk to the top of the sign including trim. 10. “Identification sign” means any sign whose sole purpose is to display the name of the site and the names of the occupants, their products or their services. 11. “Illegal sign” means any sign or advertising statuary which was not lawfully erected, maintained, or was not in conformance with the provisions of this title in effect at the time of the erection of the sign or advertising statuary or which was not installed with a valid permit from the City. 12. “Illuminated sign” means any sign utilizing an artificial source of light to enhance its visibility. 13. “Informational sign” means any sign which promotes no products or services, but displays service or general information to the public, including the likes of hours of operation, rest room identifications and hazardous warnings. 14. “Landmark sign” means an existing, legal non-conforming ground sign that has a distinctive architectural style. 724 - 39 - 15. “Nonconforming sign” means any sign or advertising statuary that was legally erected and had obtained a valid permit in conformance with the ordinance in effect at the time of the erection of the sign but which became nonconforming due to the adoption of the ordinance codified in this title. 16. “Obsolete sign” means any sign that displays incorrect or misleading information, promotes products or services no longer available at that site or identifies departed occupants. 17. “Off-site sign” means any sign not located on the premises of the business or entity indicated or advertised by the sign. This definition shall include billboards, poster panels, painted bulletins and other similar advertising displays. 18. “On-site sign” means a sign directing attention to a business, commodity, service or entertainment conducted, sold or offered upon the same premises as those upon which the sign is maintained. 19. “Political sign” means a temporary sign that encourages a particular vote in a scheduled election and is posted prior to the scheduled election. 20. “Portable Sign or Display” means any outdoor sign or display not permanently attached to the ground or a structure on the premises it is intended to occupy and displayed only during business hours. Portable sign or display includes A-frames, flower carts, statues, and other similar devices used for advertising as determined by the Director. 21. “Project announcement sign” means any temporary sign that displays information pertinent to a current or future site of construction, including the likes of the project name, developers, owners and operators, completion dates, availability and occupants. 22. “Projecting sign” means any sign other than a wall sign that is attached to and projects from a structure or building face or wall. 23. “Real estate sign” means a temporary sign indicating that a particular premises is for sale, lease or rent. 24. “Roof sign” means a sign erected between the lowest and highest points of a roof. 25. “Street address sign” means any sign that displays only the street address number(s) of the site and, at the option of the property owner, the street name. 26. “Temporary Sign” means any sign, display, banner or promotional device which is designed or intended to be displayed only during the allowable business hours or for short periods of time as specified by the Director of Community Development. 27. “V-shaped signs” means any sign consisting of two vertical faces, or essentially vertical faces, with one common edge and which appears as the letter V when viewed directly from above. 28. “Vehicle sign” means a sign painted on or attached to an operable or movable vehicle; in the case of motor vehicles, “operable” shall be defined as having a valid license plate. 29. “Wall sign” means any sign that is attached, erected or painted on a structure attached to a building, a canopy structure, or the exterior wall of a building with the exposed face of the sign parallel to the wall. 725 - 40 - 30. “Window sign” means any sign that is intended to be read from outside of the structure or painted on a window facing a public street, parking lot, pedestrian plaza or walkway accessible to the public. . “Sign Area” for an individually lettered sign without a background, is measured by enclosing the sign copy with a continuous perimeter in simple rectilinear forms. (See Appendix D for examples of sign area calculation) The sign area for a sign with borders and/or background is measured by enclosing the exterior limits of the border or background with a single continuous perimeter. The necessary supports, uprights, and/ or the base on which such sign is placed, shall be excluded from the sign area. When a sign is separated by thirty-six inches or more, the area of each part may be computed separately. “Single-family use” means the use of a parcel for only one dwelling unit. “Specialty food stores” means uses such as bakeries, donut shops, ice cream stores, produce markets and meat markets, or similar establishments where food is prepared and/or sold primarily for consumption off the premises. “Site,” for purposes of the Sign Ordinance, means a piece of land as shown on a subdivision map, record of survey map or assessor’s parcel map, which constitutes one development site and which may be composed of a single unit of land or contiguous units under common ownership, control, or development agreement. “Special event,” for purposes of the Sign Ordinance means a temporary promotional event including, but not limited to, a special sale on merchandise or services, or grand openings. “Special Event Banner” means any temporary sign constructed of pliable materials such as canvas, fabric, vinyl plastic or similar materials which will withstand exposure to wind and rain without significant deterioration, and which does not require a building permit for its construction, or installation outside of a building. “Specified anatomical areas” means: 1. Less than completely and opaquely covered human genitals, pubic region, buttocks and female breast below a point immediately above the top of the areola; and 2. Human male genitals in a discernibly turgid state, even if completely and opaquely covered. “Specified sexual activities” means: 1. Human genitals in a state of sexual stimulation or arousal; 2. Acts of human masturbation, sexual intercourse or sodomy; 3. Fondling or other erotic touching of human genitals, pubic region, buttocks or female breast. “Story” means that portion of a building, excluding a basement, between the surface of any floor and the surface of the next floor above it, or if there is no floor above it, then the space between the floor and the ceiling next above it. 726 - 41 - “Street” means a public or private thoroughfare the design of which has been approved by the City which affords the principal means of access to abutting property, including avenue, place, way, drive, lane, boulevard, highway, road, and any other thoroughfare except an alley as defined in this chapter. 1. Street, Public. “Public street” means all streets, highways, lanes, places, avenues and portions and including extensions in the length and width, which have been dedicated by the owners to public use, acquired for public use, or in which a public easement for roadway purposes exists. “Street frontage,” for purposes of the Sign Ordinance, means the length of a site along or fronting on a public or private street, driveway or other principal thoroughfare, but does not include such length along an alley, watercourse, railroad right-of-way or limited access roadway or freeway. “Structure” means that which is built or constructed, an edifice or building of any kind, or any piece of work artificially built up or composed of parts joined together in some definite manner. 1. Structure, Recreational. “Recreational structure” means any affixed accessory structure or portion, which functions for play, recreation or exercise (e.g., pool slides, playhouses, tree houses, swings, climbing apparatus, gazebos, decks, patios, hot tubs and pools) but does not include portable play structures, such as swings or climbing apparatus. “Structurally attached” means any structure or accessory structure or portion thereof, which is substantially attached or connected by a roof structure or similar physical attachment. “Supportive housing” (per Government Code Section 65582(f), as may be amended) means housing with no limit on length of stay, that is occupied by the target population, and that is linked to onsite or offsite services that assist the supportive housing resident in retaining the housing, improving his or her health status, and maximizing his or her ability to live and, when possible, work in the community. S. “T” Definitions: “Target population” (per Government Code Section 65582(g), as may be amended) means persons with low incomes having one or more disabilities, including mental illness, HIV or AIDS, substance abuse, or other chronic health conditions, or individuals eligible for services provided under the Lanterman Developmental Disabilities Services Act (Division 4.5 (commencing with Section 4500) of the Welfare and Institutions Code). “Transient” means any individual who exercises occupancy or is entitled to occupancy by reason of concession, permit, right of access, license or other agreement for a period of thirty consecutive calendar days or less, counting portions of calendar days as full days, and including any individual who actually physically occupies the premises, by permission of any other person entitled to occupancy. “Transitional housing” (per Government Code Section 65582(h), as may be amended) means buildings configured as rental housing developments, but operated under program requirements that call for the termination of assistance and recirculation of the assisted unit to 727 - 42 - another eligible program recipient at some predetermined future point in time, which shall be no less than six months from the beginning of assistance. “Trim” means the molding, battens, cappings, nailing strips, lattice and platforms which are attached to a sign. T. “U” Definitions: “Use” means the conduct of an activity, or the performance of a function or operation, on a parcel or in a building or facility. 1. “Accessory use” means a use which is incidental to and customarily associated with a specified principal use. 2. “Conditional use” means a use listed by the regulations of any particular district as a conditional use within that district, and allowable solely on a discretionary or conditional basis, subject to issuance of a conditional use permit, and to all other regulations established by this title. 3. “Nonconforming use” means a use which is not a permitted use or conditional use authorized within the district in which it is located, but which was lawfully existing on October 10, 1955; or the date of any amendments thereto, or the application of any district to the property involved, by reason of which adoption or application the use became nonconforming. (See “noncomplying facilities” in this chapter for a definition.) 4. “Permitted use” means a use listed by the regulations of any particular district as a permitted use within that district, and permitted therein as a matter of right when conducted in accord with the regulations established by this title. 5. “Principal use” means a use which fulfills a primary function of a household, establishment, institution, or other entity. “Useable rear yard” means that area bounded by the rear lot line(s) and the rear building line extended to the side lot lines. The side yard adjacent to a proposed minor addition (e.g., addition equaling ten percent or less of the principal structure) may be included in calculation of usable rear yard area. U. “V” Definitions: “Variance application” means an application for which an exception process is not identified in the Municipal Code. “Vehicle” means any boat, bus, trailer, motor home, van, camper (whether or not attached to a pickup truck or other vehicle), mobilehome, motorcycle, automobile, truck, pickup, airplane, boat trailer, truck tractor, truck trailer, utility trailer or recreational vehicle, or parts, or any device by which any person or property may be propelled, moved or drawn upon a public street, excepting a device moved exclusively by human power. 1. Vehicle, commercial. “Commercial vehicle” means a vehicle of a type required to be registered under the California Vehicle Code used or maintained for the transportation of persons for hire, compensation, or profit or designed, used, or maintained primarily for the transportation of goods. 728 - 43 - 2. Vehicle, Recreation. “Recreation vehicle” means a vehicle towed or self-propelled on its own chassis or attached to the chassis of another vehicle and designed or used for temporary dwelling, recreational or sporting purposes. The term recreation vehicle includes, but is not limited to, trailers, motor coach homes, converted trucks and buses, and boats and boat trailers. “Very low income household” means a household whose gross income does not exceed that established by Health and Safety Code Section 50105, as may be amended. “Visual privacy intrusion” means uninterrupted visual access from a residential dwelling or structure into the interior or exterior areas of adjacent residential structures, which area is either completely or partially private, designed for the sole use of the occupant, and/or which serves to fulfill the interior and/or exterior privacy needs of the impacted residence or residences. V. “W” Definitions: None. W. “X” Definitions: None. X. “Y” Definitions: “Yard” means an area within a lot, adjoining a lot line, and measured horizontally, and perpendicular to the lot line for a specified distance, open and unobstructed except for activities and facilities allowed therein by this title. 1. “Front yard” means a yard measured into a lot from the front lot line, extending the full width of the lot between the side lot lines intersecting the front lot line. 2. “Rear yard” means a yard measured into a lot from the rear lot line, extending between the side yards; provided that for lots having no defined rear lot line, the rear yard shall be measured into the lot from the rearmost point of the lot depth to a line parallel to the front lot line. 3. “Side yard” means a yard measured into a lot from a side lot line, extending between the front yard and rear lot line. Y. “Z” Definitions: None. 729 ATTACHMENT IV - 44 - CHAPTER 19.12 – ADMINISTRATION Section 19.12.010 Purpose and intent. 19.12.020 Applicability of Regulations. 19.12.030 Approval Authority 19.12.040 Authority of the Director of Community Development. 19.12.050 Authority of the Design Review Committee. 19.12.060 Authority of the Planning Commission. 19.12.070 Authority of the City Council. 19.12.080 Application Process 19.12.090 Action by Director. 19.12.100 Decision 19.12.110 Noticing. 19.12.120 Action by Director of Community Development — Administrative. 19.12.130 Action by Design Review Committee and Planning Commission. 19.12.140 Action by City Council. 19.12.150 Notice of Decision and Reports. 19.12.160 Effective date. 19.12.170 Appeals 19.12.180 Expiration, Extension and Revocation. 19.12.010 Purpose and intent. The purpose and intent of the Administration section is to establish procedures for the discretionary review of development in the city in order to ensure that new development and changes to existing developments comply with city development requirements and policies. This chapter establishes the procedures for review of applications before the approval authorities for each type of project and the process for appeals of any requirement, decision or determination made by any Approval Body. 19.12.020 Applicability of Regulations. Except as otherwise provided in this section, Development Review is required for all zoning map and text amendments, new construction, modifications to building exteriors or site improvements, and changes in Land Use, including, but not limited to, the following: A. In the A, A1, R1 and RHS Zones, the following activities: 730 - 45 - 1. Conditional uses in accord with Chapter 19.20, Chapter 19.24, Chapter 19.28, Chapter, 19.32, Chapter 19.36, Chapter 19.40 and Chapter 19.44; 2. Removal of protected trees identified in Chapter 14.18; 3. Projects in R1 zones identified in Section 19.28.040; 4. Height Exceptions identified in Section 19.24.070(B)(3); 5. Hillside Exceptions identified in Section 19.44.070 and Chapter 19.48; 6. Parking Exceptions identified in Chapter 19.124; 7. Fence Exceptions identified in Chapter 19.48 8. Variance to all other zoning regulations B. In R2, R3, R1C and all Commercial, Industrial, Office, Planned Community Districts and other non-residential zoning districts: 1. New structures or property development, including signs and sign programs. 2. Building additions, exterior modifications to existing structures including signs and sign programs, and site changes (including, but not limited to, new or modified landscaping, tree removals, fencing, changes to parking lot space striping or circulation); 3. Changes in property or building use that involve exterior modifications; 4. Exceptions or modifications to the development's required and/or existing parking; 5. Conditional uses in accord with Chapter 19.60, Chapter 19.64, Chapter 19.68, Chapter 19.72, Chapter 19.76, Chapter 19.80, Chapter 19.84, Chapter 19.88, Chapter 19.92, Chapter 19.96, Chapter 19., Chapter 19.128, Chapter 19.116, Chapter 19.132, Chapter 19.136; 19.12.030 Approval Authority Table 19.12.030 shows the approval authority, Noticing Radius, Expiration Date and Extension Dates for different types of Permits. 731 - 46 - Table 19.12.030: Approval Authority Type of Permit or Decision A, B Administrative Review Design Review Committee Planning Commission City Council Public Hearing/ Public Meeting/ Comment Period C Noticing/ Noticing Radius D Posted Site Notice Expiration Date E Chapter/ Findings General Plan Amendment Major F - - R F PH CA. Govt. Code 65350- 65362 Yes - CA. Govt. Code 65350- 65362 Minor G - - R F PH Yes - Zoning Map Amendments Major F - - R F PH CA. Govt. Code 65853 - 65856 Yes - 19.152.020 Minor G - - R F PH Yes - Zoning Text Amendments - - R F PH CA. Govt. Code 65853 - 65856 - - 19.152.030 Specific Plans - - R F PH CA. Govt. Code 65350- 65362 - - 20.04.030 Development Agreements - - R F PH CA. Govt. Code 65867 Yes - 19.144.120 Development Permits Major F, H - - F/R A1/F PM 19.12.110/ 300’ Yes 2 years 19.156.050 Minor G F - A1 A2 PM Yes 2 years 732 - 47 - Type of Permit or Decision A, B Administrative Review Design Review Committee Planning Commission City Council Public Hearing/ Public Meeting/ Comment Period C Noticing/ Noticing Radius D Posted Site Notice Expiration Date E Chapter/ Findings Conditional Use Permits Major F, H, I F - A1/F/R A1/A2/F PH CA. Govt. Code 65905 Yes 2 years 19.156.050 Minor G, I F - A1/F/R A1/A2/F PH Yes 2 years Temporary F - A1 A2 - None No 1 year None 19.160.030 Density Bonus (Residential) R F Based on concurrent application 19.52 Adult-Oriented Commercial Activity (CUP) - R F PH CA. Govt. Code 65905/ 300’ Yes 2 years 19.128.030 & 19.128.040 Architectural and Site Approval Major J F - A1 A2 PM 19.12.110/ Adjacent Yes 2 years 19.168.030 Minor K F - A1 A2 PM Yes 2 years Amendment Major F, H - - F A1 PM/PH 19.12.110/ 300’ Yes 2 years 19.44, 19.156, 19.164 Minor G F - A1 A2 PM/PH Yes 2 years Minor Modification F - A1 A2 - None No 2 years 19.164 Hillside Exception/ Height Exception / Heart of the City Exception I - - F A1 PH 19.12.110/ 300’ Yes 2 years 19.40.080, 19.24.070, 19.136.090 Variance F - A1 A2 PH CA. Govt. Code 65905 Yes 2 years 19.156.060 Status of non-conforming Use - - F A1 PH 19.12.110/ 300’ Yes - 19.140.110 733 - 48 - Type of Permit or Decision A, B Administrative Review Design Review Committee Planning Commission City Council Public Hearing/ Public Meeting/ Comment Period C Noticing/ Noticing Radius D Posted Site Notice Expiration Date E Chapter/ Findings Wireless Antennas I F - F/ A1 A2 Varies I Depends on application type Yes 2 years 19.136.090 Signs Permits F - A1 A2 - None No 1 year 19.104 Neon, Reader board & Freeway Oriented Signs I - F F A1 L PM 19.12.110/ 300’ No 1 year 19.104 Programs F - A1 A2 - None No 1 year 19.104 Exceptions I - F - A1 L PM 19.12.110/ Adjacent Yes 1 year 19.104.290 Parking Exceptions I F F A1 A1 L /A2 Varies M 19.12.110/ Adjacent/ 300’ N Yes 1 year 19.124.050 Fence Exceptions - F - A1 L PM 19.12.110/ Adjacent Yes 1 year 19.48.060 Front Yard Interpretation F - A1 A2 PM 19.12.110/ Adjacent Yes 1 year 19.08 R1 Ordinance Permits Two-story I F F F/A1 A1 L /A2 Varies I 19.12.110/ Adjacent Yes 1 year 19.28.140 Minor Residential F - A1 A2 CP No 1 year Exceptions I - F - A1 L PM Yes 1 year Protected Trees Tree Removal F - A1 A2 CP Adjacent/ Depending Yes 1 year 14.18.180 734 - 49 - Type of Permit or Decision A, B Administrative Review Design Review Committee Planning Commission City Council Public Hearing/ Public Meeting/ Comment Period C Noticing/ Noticing Radius D Posted Site Notice Expiration Date E Chapter/ Findings on type of application Heritage Tree Designation & Removal - - F A1 PM 19.12.110/ 300’ Yes - 14.18 Tree Management Plan F - A1 A2 - None No - 14.18 Retroactive Tree Removal F - A1 A2 - None No - 14.18 Reasonable Accommodation F - A1 A2 - None No 1 year 19.52.050 Extensions O Parking, Fence & Sign Exceptions & Front Yard Interpretations F - A1 A2 - None No 1 year Neon, Reader board & Freeway Oriented Signs F A1 A2 - None No 1 year Two Story Permits, Minor Residential Permits and Exceptions F A1 A2 - None No 1 year Tree Removals F - A1 A2 - - No 1 year All other projects F - A1 A2 - 19.12.110/ None No 2 years Key: R—Review and recommendation body F — Final decision-making body unless appealed A1 —Appeal Body on first appeal A2 — Appeal body on second appeal PH – Public Hearing PM – Public Meeting CP – Comment Period 735 - 50 - Notes: A. Permits can be processed concurrently with other applications, at the discretion of the Director of Community Development. B. Projects with combined applications shall be processed at the highest level of approval in conformance with Section 19.04.090. C. Public Hearing: Projects types that need noticing pursuant to the CA Government Code; Public Meeting: Project types that need only a mailed notice and no newspaper notices; Comment Period: Project types that need only a mailed notice and do not need a public hearing or public meeting. D. Noticing Radius of an application in a combined application shall correspond to the maximum noticing radius required for any one of the applications. E. Expiration date of an application in a combined application shall correspond to the maximum expiration date allowed for any one of the development applications (not including Subdivision Map Act applications, General Plan Amendments and Zoning Map or Text Amendments.) F. Major General Plan Amendment, Conditional Use Permit, Development Permit application - for more than ten thousand square feet of commercial and/or industrial and/or office and/or other non-residential use, or greater than six residential units G. Minor General Plan Amendment, Conditional Use Permit, Development Permit application - for ten thousand square feet or less of commercial and/or industrial and/or office and/or other non-residential use, or six or less residential units. H. City Council review for applications with new development greater than fifty thousand square feet of commercial, and/or greater than one hundred thousand square feet of industrial and/or office and/or other non-residential use, and/or greater than fifty residential units. Planning Commission review for all other applications. I. Please see specific zoning district regulations or chapters in this title that apply to the subject property or project for approval authority. J. Major Architectural and Site Approval application - architectural and site approval for all projects that are not a Minor Architectural and Site Approval application. K. Minor Architectural and Site Approval application - single family home in a planned development zoning district, minor building architectural modifications, landscaping, signs and lighting for new development, redevelopment or modification in such zones where review is required and minor modifications of duplex and multi-family buildings. L. Appeals of Design Review Committee decisions shall be heard by the City Council. M. Parking Exceptions approved by the Director of Community Development need a comment period. Parking Exceptions approved by the Design Review Committee need a public meeting. N. Parking Exceptions in Single-family residential (R1) zones and Duplex (R2) zones need adjacent noticing. All other Parking Exceptions need notices within three hundred feet of the exterior boundary of the subject property. O. Application must be filed prior to expiration date of permit. Permit is extended until decision of the Approval Body on the one-time extension. 736 - 51 - 19.12.040 Authority of the Director of Community Development. Subject to the provisions of this chapter and general purpose and intent of this title, the authority of the Director of Community Development is as follows: A. Grant any permits which are authorized to be issued by the Director pursuant to Section 19.12.030 and any other provisions of this code; B. Grant parking exceptions for projects that are reviewed in conjunction with permits which are authorized to be issued by the Director of Community Development pursuant to Section 19.12.030; C. Grant a variance from site development regulations and parking and loading regulations (except those handicapped parking regulations mandated by State law) applicable within any zoning district established by this title; D. Grant a variance from the special conditions of approval that apply to site development and parking and loading regulations (including conditions attached to planned developments) applicable within any zoning district established by this title. E. Grant a request for reasonable accommodation made by any person with a disability, when the strict application of the provisions within residential districts acts as a barrier to fair housing opportunities, pursuant to Chapter 19.52. F. Make reasonable interpretations of the regulations and provisions of this title, and any chapter therein, consistent with the legislative intent. Persons aggrieved by an interpretation of the Director of Community Development may petition the Planning Commission in writing for review of the interpretation. G. May refer an application to another Approval Body for review, decision or recommendation. 19.12.050 Authority of the Design Review Committee. Subject to the provisions of this chapter and general purpose and intent of this title, the authority of the Design Review Committee is as follows: A. Grant any permits and exceptions which are authorized to be issued by the Design Review Committee pursuant to Section 19.12.030 and any other provisions of this code; B. Grant parking exceptions for projects that are in conjunction with permits which are authorized to be issued by the Design Review Committee pursuant to Section 19.12.030. 19.12.060 Authority of the Planning Commission. Subject to the provisions of this chapter and general purpose and intent of this title, the authority of the Planning Commission is as follows: A. Grant any permits which are authorized to be issued by the Planning Commission pursuant to Section 19.12.030 and any other provisions of this code; B. Grant parking exceptions for projects that are in conjunction with permits which are authorized to be issued by the Planning Commission pursuant to Section 19.12.030; 737 - 52 - C. Make recommendations to the City Council on applications in which it is a recommending body; and D. Decide on appeals of decisions pursuant to Section 19.12.030. 19.12.070 Authority of the City Council. Subject to the provisions of this chapter and general purpose and intent of this title, the authority of the City Council is as follows: A. Grant any permits which are authorized to be issued by the City Council pursuant to Section 19.12.030 and any other provisions of the code; B. Decide on appeals of decisions pursuant to Section 19.12.030. 19.12.080 Application Process The following provisions outline the requirements for the filing of applications for permits, entitlements, amendments, and approvals. Unless otherwise specified in this title, all applications for permits, entitlements, amendments and approvals required by this title shall be filed in compliance with this section. Applications for permits, permit modifications, amendments and other matters pertaining to this Chapter shall be filed with the Director of Community Development with the following: A. An application for permit may be made by the owner of record, his or her agent, lessee(s) of property, or person(s) who have contracted to purchase or lease property contingent upon their ability to acquire the necessary permit under this title and who have written authorization from the property owner to make an application. B. Application shall be made on a form provided by the City, and shall contain the following, unless waived by the Director of Community Development based on the scope of the proposed project: 1. A complete legal description of the subject property and map showing the location of the property for which the permit is sought; 2. A preliminary title report of the subject property; 3. The proposed site development plan indicating: the location of all buildings and structures; the location and types of land uses; paved areas, such as roadways, driveways and walkways; and general landscaping scheme; 4. Architectural drawings of the proposed development, building additions or other structures. Drawings shall indicate building height, colors, materials, window treatment and other architectural features; 5. Maps showing the locations of buildings; 6. Renderings showing building heights and square footages; 7. Maps showing the precise location of roads, streets, alleys and access points; 8. A traffic analysis, if required; 738 - 53 - 9. A construction plan, 10. Any property/development with a Homeowner’s Association (HOA) or Architectural Review Board (ARB) shall provide a letter of approval from said HOA Board or ARB. 11. The Director of Community Development may reasonably require additional information which is pertinent and essential to the application. 12. Zoning Map or Text Amendments shall also include information required per Chapter 19.152. a. Zoning applications for Planned Development Zoning Districts shall also include information required per Section 19.80.040; b. Zoning applications for Multi-Family (R3) Residential shall also include information required per Section 19.36.040; and c. Zoning applications for Residential Single-family Cluster (R1C) initiated by a property owner, or his or her designee, shall also include items identified in Section 19.44.050H. 13. Planned Development Permit and Development Permit applications shall also include information required per Section 19.156.010: 14. Conditional Use Permits and Variances shall also include information required per Section 19.156.020. 15. Density Bonus Permit applications shall also include information required per Section 19.56.060. 16. Conversion of Apartment Projects to Common Interest Developments applications shall also include information required per Section 19.116.050. 17. Sign Permit Applications should also include information required per Section 19.104.040. C. Application shall be accompanied by the fee prescribed by City Council resolution, no part of which shall be returnable to the applicant. 19.12.090 Action by Director. Upon receipt of an application for a permit, the Director of Community Development shall: A. Within thirty days determine whether the application is complete or needs additional information and shall inform the applicant. B. Not later than a period stipulated in Section 19.12.100, Decision, below: 1. Set a date for a public hearing or public meeting upon the matter at a regular or special meeting of the approval authority for the project for applications that require a public hearing or public meeting, or 2. Send notice in accord with the requirements of 19.12.110(D) for applications that do not need a public hearing or public meeting. 739 - 54 - 19.12.100 Decision Unless postponed or continued with the mutual consent of the Director of Community Development and the applicant and written confirmation from the applicant, a decision shall be rendered: A. No later than sixty (60) days following the date the application is deemed complete and either categorically exempt under the California Environmental Quality Act (CEQA) or the adoption of a negative declaration or one hundred and eighty (180) days of certification of an Environmental Impact Report (EIR). B. Notwithstanding the above, no later than one hundred and fifty (150) days upon receipt of a complete application for a new personal wireless communication facility or ninety (90) days upon receipt of an application for collocation of a personal wireless communication facility/antennas. 19.12.110 Noticing. A. Notice of Public Hearing: Noticing shall be provided in conformance with applicable California Government Code Sections, as may be amended from time to time, for applications that need a public hearing. B. Notice of Public Meeting: For projects requiring notice of a public meeting, notice shall be provided in conformance with California Government Code Section 65091, as may be amended from time to time, as follows:. 1. Written notice by first class mail to: a. Each owner of record of real property within the noticing radius per Section 19.12.030 of the exterior boundary of the property for which the application is made as the owner of record is shown in the last tax assessment roll; b. Owner(s) of subject site or his or her authorized agent c. Project applicant(s) d. Any individual or entity that has filed a written request with the City Clerk requesting notification of public hearings e. Local agencies expected to provide water, sewage, streets, roads, schools or other essential facilities or services to the proposed project; 2. If the number of owners to whom notice would be mailed or delivered pursuant to subsection C1 above is greater than one thousand, in lieu of mailed or delivered notice, the Director may provide published notice as provided in Government Code Section 65091 (a)(4). 3. The notice shall contain information pursuant to Government Code Section 65094. C. Notice of Comment Period: For projects requiring notice of a comment period, notice shall be mailed in accord with 19.12.110C(1)(a)-(d), fourteen calendar days prior to the date of action on the application. 1. For permits issued pursuant to Chapter 19.28, Single Family Residential, the mailed notice shall include a copy of the site plan and elevation plans of the proposed project. 740 - 55 - 2. For permits issued pursuant to Chapter 14.18, Protected Trees, the mailed notice shall include a copy of the site plan and tree replacement/mitigation plan. D. The City may also give notice of public hearings/public meetings in any other manner it deems necessary or desirable. If the Director of Community Development believes the project may have impacts beyond the range of the mailed notice, particularly on nearby residential areas, the Director, in his or her discretion, may expand noticing beyond the stated requirements in Section 19.12.030. Compliance with the procedures set forth in this section shall constitute a good-faith effort to provide notice, and the failure to provide notice, and the failure of any to receive notice, shall not prevent the City from proceeding with a hearing, meeting or from taking any action nor affect the validity of any action. Typographical and/or publishing errors shall not invalidate the notice nor any City action related to the notice. E. Posted Site Notice: 1. Applicants shall install notice(s) on the subject site that is/are clearly visible from the street in accord with the requirements of Table 19.12.030. a. Applicants must install a public notice in the front yard of the subject site. b. For all applications other than Two Story Permits, Residential Design Review and Tree Removal applications in R1 or R2 zones, if the subject site has more than one property line abutting a street, the applicant may be required to install more than one notice. 2. The notice shall be a weatherproof sign, at least 2 feet tall and 3 feet wide, firmly attached to a 5 foot tall post. 3. The notice shall be placed the same number of days prior to the decision/public hearing as required for the public hearing or mailed notices per Section 19.12.110 A – C and shall remain in place until an action has been taken on the application and the appeal period has passed. 4. The notice shall contain the following: a. The general location of the property, by text or diagram; b. A brief general description of the proposed project, the content of which shall be at the sole discretion of the City; c. City contact information for public inquiries; d. A deadline for the submission of public comments; e. If proposing a physical alteration to an existing building or new buildings, at least one of the following visual representations of the proposed project: i. A color perspective drawing or three-dimensional (3-D) photographic simulation of the proposed project, in a size deemed appropriate by the Director of Community Development. 741 - 56 - ii. For Two Story Permits and Residential Design Review applications, a color or black and white perspective drawing or three-dimensional (3-D) photographic simulation of the proposed project, at least 11 inches by 17 inches in size. iii. Visual Representation is not required for applications that do not have a material change in the physical appearance of the property. 19.12.120 Action by Director of Community Development — Administrative. A. For applications requiring Administrative approval with a public meeting, public hearing or comment period, the Director of Community Development or his or her designee may, subject to the requirements of Section 19.12.100, Decision: 1. Issue his or her decision at the conclusion of the public meeting, public hearing or comment period; 2. Continue the item for additional public hearings, public meetings or comment period; or 3. Defer action by taking the item under advisement and issuing the decision no later than thirty (30) days following the public meeting, public hearing or comment period. B. No additional noticing is required if a project is continued. C. For applications where a public meeting or public hearing is required to be held before the Director of Community Development, the meeting shall be held in the same manner as a Design Review Committee meeting. 19.12.130 Action by Design Review Committee and Planning Commission. A. For applications where the Design Review Committee or Planning Commission is the Approval Body, it shall render a decision, which is supported by the evidence contained in the application or presented at the meeting, at the meeting, or at a subsequent meeting after conclusion of the public hearing or public meeting, subject to the requirements of Section 19.12.100, Decision. B. For zoning map amendments, on the basis of evidence and testimony presented to the Planning Commission at the public hearing, the Planning Commission may determine that the public interest will be served, either by revising the area being considered for reclassification to include properties not originally part of the application, or by giving consideration to district classifications not originally requested by the application. The Planning Commission may, solely at its option, consider additional properties or district classifications, or both. C. For applications requiring City Council approval, the reviewing body shall forward its written findings, determinations and recommendation to the City Council for final action, subject to the requirements of Section 19.12.100, Decision. 742 - 57 - 19.12.140 Action by City Council. A. Upon receipt of a recommendation of the reviewing body, the City Council may by resolution approve, modify, or disapprove the recommendation of the reviewing body, subject to the requirements of Section 19.12.100, Decision. B. Upon final approval of a zoning or prezoning application, the City Council shall enact an ordinance zoning or prezoning the subject property or properties, incorporating within the ordinance: 1. A Conceptual development plan, if required, and 2. Conditions of approval. C. For a Development Agreement, the City Council shall enact an ordinance that shall refer to and incorporate the text of the Development Agreement by reference. D. For applications requiring City Council approval, the City Council shall issue its decision at the conclusion of the public hearing or public meeting. 19.12.150 Notice of Decision and Reports. A. Notice of decision: 1. The decision for applications approved with a public meeting or public hearing shall be mailed to the property owner and applicant at the address shown on the application. 2. The decision for applications approved with a notice period shall be mailed to the property owner and the applicant at the address shown on the application and any person who has commented on the proposed project within the notice period. 3. The decision shall contain the following: a. Applicable findings; b. Any reasonable conditions or restrictions deemed necessary to secure the purpose of this title and to assure operation of the development and/or use in a manner compatible with existing and potential uses on adjoining properties and in the general vicinity; and c. Reporting/monitoring requirements deemed necessary to mitigate any impacts and protect the health, safety and welfare of the city. 4. The decision of the Director of Community Development, Design Review Committee or Planning Commission shall be final unless appealed in accord with Section 19.12.170, Appeals. A decision of the City Council shall be final. B. Reports: The Director of Community Development shall endeavor to forward reports, within five calendar days from the date of the decision, to the: 1. Planning Commission and the City Council of a decision by the Director of Community Development 743 - 58 - 2. Planning Commission and the City Council of a decision by the Design Review Committee. 3. City Council of a decision by the Planning Commission. 19.12.160 Effective date. A. A permit approved by the City Council shall take effect ten days following the date that the findings are adopted. B. Specific Plans, General Plan Amendments, Zoning Ordinance/Map Amendments, and Development Agreements shall become effective thirty (30) days following the final date of action (e.g., adoption) by the City Council. C. All other permits shall take effect fourteen calendar days following the date that the findings are adopted by the appropriate Approval Body, unless an appeal is filed as provided in Section 19.12.170. 19.12.170 Appeals A. An appeal may be filed by any person, firm or corporation aggrieved or affected by any grant, denial, modification or revocation of any permit, or any determination or interpretation related to any provision of this title. B. Filing: 1. An appeal shall be in writing on forms prescribed by the City and shall be filed during regular office hours with the City Clerk within fourteen calendar days after the City decision or if a notice of decision is not required, from the date of the decision or determination, under this title. An appeal not filed within such time shall be barred. The appeal shall state the grounds and basis thereof. 2. Appeals under this chapter are subject to an appeal fee as prescribed by resolution of the City Council. C. Noticing: Notice of hearing shall be given in the same manner in which the original notice was given. If a project with no noticing is appealed, appropriate noticing shall be determined by the Director of Community Development. D. Appeal hearing body shall be determined in accord with Section 19.12.030, Approval Authority. E. Decision of the appeal hearing body: The decision or determination of the appeal hearing body on any appeal shall be final and effective immediately. F. Notice of Decision: Notice of the appeal hearing body’s decision shall be mailed to the original applicant, to the person filing the appeal, and to any other person who has filed a written request with the City Clerk. 19.12.180 Expiration, Extension and Revocation. A. Expiration. 744 - 59 - 1. Approval on a permit or variance shall become null and void and of no effect, within the time frame specified in Section 19.12.030 following its issuance, unless a shorter or longer time period is specifically prescribed in the conditions of permit or variance, unless: a. A building permit is filed and accepted by the City (fees paid and control number issued.) In the event that a building permit expires for any reason, the permit shall become null and void. b. The permit or variance has been used A permit or variance shall be deemed to be "used" when actual substantial and continuous activity has taken place upon the land subject to the permit or variance or, in the event of the erection or modification of a structure or structures, when sufficient building activity has occurred and continues to occur in a diligent manner. 2. Notwithstanding subsection 1 of this section, if the use for which a conditional use permit was granted and utilized has ceased or has been suspended for one year or more, the permit becomes null and void. 3. Unless a variance or exception has expired pursuant to subsection 1 of this section, it shall continue to exist for the life of the existing structure or such structure as may be constructed pursuant to the approval unless a different time period is specified in its issuance. A variance or exception from the parking and loading regulations, and a sign exception shall be valid only during the period of continuous operations of the use and/or structure for which the variance or exception was issued. B. Extensions. A permit or variance may, in accord with Section 19.12.030, Approval Authority, be extended, one-time only, for the time frame specified in Section 19.12.030, upon timely submittal of an application with the Director of Community Development prior to expiration. C. Revocation 1. Process. In any case where, in the judgment of the Director, substantial evidence indicates that the conditions of a permit or variance have not been implemented, or where the permit or variance is being conducted in a manner detrimental to the public health, safety, and welfare, the Director shall set a date for a public hearing before the decision maker granting the original permit or variance, and notice a public hearing in accordance with Section 19.12.110, Noticing, of this code. 2. Findings: A permit may be revoked or modified if any one of the following findings can be made: i. That the permit was obtained by misrepresentation or fraud; ii. That the improvement, use or activity authorized in compliance with the permit had ceased or was suspended for one year or more; iii. That one or more of the conditions of the permit have not been met; or iv. That the owner or occupant of the property is conducting the use or any associated or other use of the property in violation of the law. 745 - 60 - v. In the case of revocation of a sign permit, the sign was abandoned for a period of thirty days. 746 ATTACHMENT V - 61 - CHAPTER 19.20 - PERMITTED, CONDITIONAL AND EXCLUDED USES IN AGRICULTURAL AND RESIDENTIAL ZONES Section 19.20.010 Applicability of Regulations 19.20.020 Permitted, Conditional and Excluded Uses in Agricultural and Residential Zones 19.20.010 Applicability of Regulations No building or structure or land shall be used in an A, A-1, R-1, RHS, R1C, R-2, or R-3 zoning district, otherwise than in conformance with the provisions of this chapter. 19.20.020 Permitted, Conditional and Excluded Uses in Agricultural and Residential Zones Table 19.20.020 sets forth the Permitted, Conditional and Excluded Uses in Agricultural and Residential zones Table 19.20.020 – Permitted, Conditional and Excluded Uses in Agricultural and Residential Zones Zoning Districts A A-1 R-1 RHS R1C R-2 R-3 Uses 1. Agriculture, horticulture, viticulture and forestry, including the following and similar uses: P P - - - - - a. Field and truck crops, including drying and storage, P P - - - - - b. Orchards and vineyards, including bottling and storage, P P - - - - - c. Tree farms, botanical conservatories and arboreta, P P - - - - - d. Barns and sheds, P P - - - - - e. Keeping of draft animals, animals providing products used on the property, P P - - - - - f. Livestock ranches and dairy farms depending mainly on grazing on the property, P CUP - PC - - - - - g. Processing of dairy products produced on the property, P CUP - PC - - - - - h. Poultry raising and hatcheries, P CUP - PC - - - - - i. Apiaries, P CUP - PC - - - - - 747 - 62 - Zoning Districts A A-1 R-1 RHS R1C R-2 R-3 Uses j. Nurseries, greenhouses and landscaping gardens, P CUP - PC - - - - - k. Boarding kennels, CUP - PC CUP - PC - - - - - l. Animal breeding; P CUP – Admin. - - - - - 2. Fur farms - CUP - PC - - - - - 3. Retail sale of wine, fruit or berries produced on the property; CUP - CC CUP - CC - - - - - 4. Single-family dwelling unit with not more than one dwelling unit per lot/defined air space for condominiums; P P P P P - - 5. Two-story structures in an area designated for a one-story limitation pursuant to Section 19.28.060 G(6) of this chapter, provided that the Planning Commission determines that the structure or structures will not result in privacy impacts, shadowing, or intrusive noise, odor, or other adverse impacts to the surrounding area; - - CUP - PC - - - - 6. Employee housing: a. For six or fewer employees in each dwelling unit on each lot P P P P P P P b. With no more than 36 beds in group quarters or 12 units/ spaces designed for use by a single family or household on each lot P P - CUP- Admin. - - - 7. A second dwelling unit a. Which conforms to the requirements of Chapter 19.112; P P P P - - - b. Which requires a conditional use permit pursuant to Chapter 19.112; CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. - - - 8. Multiple-family residential dwellings - - - - - - P 9. Accessory facilities and uses customarily incidental to permitted uses and otherwise conforming with the provisions of Chapter 19.100 of this title; P P P P P P P 748 - 63 - Zoning Districts A A-1 R-1 RHS R1C R-2 R-3 Uses 10. Utility facilities essential to provision of utility services to the neighborhood but excluding business offices, construction or storage yards, maintenance facilities, or corporation yards; P P P P P P CUP – CC 11. Temporary buildings for construction purposes (including trailers) for a period not to exceed the duration of such construction; - - - - - - P 12. Home occupations; a. When accessory to permitted use and otherwise conforming to the provisions of Chapter 19.120 of this title; P P P P P P P b. Requiring a Conditional Use Permit pursuant to Chapter 19.120 of this title; CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. 13. Small-family day care home per dwelling unit; P P P P P P P 14. Large-family day care home per dwelling unit; a. Which meets the parking criteria contained in Chapter 19.124, and which is at least three hundred feet from any other large- family day care home. The Director of Community Development or his or her designee shall administratively approve large day care homes to ensure compliance with the parking and proximity requirements; P P P P P P CUP – Admin. b. Which otherwise does not meet the criteria for a permitted use. The conditional use permit shall be processed as provided by CA Health and Safety Code Section 1597.46 (3); CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. 15. Residential care facility with six or fewer residents, not including the provider, provider family or staff , provided that the facility obtains any license, if required, issued by appropriate State and/or County agencies and/or departments; P P P P P P P 749 - 64 - Zoning Districts A A-1 R-1 RHS R1C R-2 R-3 Uses 16. Residential care facility, in each dwelling unit, with seven or greater residents, not including the provider, provider family or staff, and is a minimum distance of five hundred feet from the property boundary of another residential care facility, provided that the facility obtains any license, if required, issued by appropriate State and/or County agencies and/or departments; CUP - PC CUP - PC CUP - PC CUP - PC CUP – PC * CUP - PC CUP – PC 17. Congregate residence, in each dwelling unit: a. With six or fewer residents P P P P P P P b. With seven or greater residents which is a minimum distance of one thousand feet from the boundary of another congregate residence and has a minimum of seventy-five square feet of usable rear yard area per occupant CUP – PC CUP – PC CUP – PC CUP – PC CUP – PC * CUP – PC CUP – PC 18. Transitional housing located in housing of a type permitted in the zone; P P P P P P P 19. Supportive housing located in housing of a type permitted in the zone; P P P P P P P 20. Horticulture, gardening, and growing of food products: a. Recreational for personal use; P P P P P P - b. Limited to maximum of ten percent of the lot area and for consumption by occupants of the site; - - - - - - P c. Produce grown on site may be sold if the business activity is conducted in a manner consistent with Chapter 19.120, Home Occupations; - - - P - - - d. Commercial purposes; See #1 See #1 - CUP – Admin. - - - 21. Limited commercial recreation uses, such as riding clubs and related stables and trails, golf courses, swimming and picnic grounds, - - - CUP - PC - - - 22. Golf courses and driving ranges; CUP - CC CUP - CC - - - - - 750 - 65 - Zoning Districts A A-1 R-1 RHS R1C R-2 R-3 Uses 23. Commercial swimming pools and picnic areas; CUP - CC CUP - CC - - - - - 24. Temporary uses subject to regulations established by Chapter 19.156 CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin CUP – Admin. CUP – Admin. 25. Buildings or structures which incorporate solar design features that require variation from setbacks upon a determination by the Director that the design feature, or features, will not result in privacy impacts, shadowing, or intrusive noise, odor, or other adverse impacts to the surrounding area. CUP – Admin. CUP – Admin. - CUP – Admin. - - - 26. Transmission lines, transformer stations, television and radio towers, and other public utility and communication structures; CUP - PC CUP - PC - - - - - 27. Adult (over 4 months of age) household pets per dwelling unit, limited as follows: a. No specified number P P - - - - - b. Maximum of four, provided no more than two adult dogs or cats may be kept on the site - - P - P P P c. Limited to one per three thousand square feet of lot area, except: - - - P † - - - 1. Dogs are limited to a maximum of two on lots less than one acre and four for lots greater than one acre, 2. The number of geese, ducks, chickens, rabbits and other farm animals are not limited on a site greater than one acre 28. Litter of dogs or cats up to four months of age: a. No specified number P P - P - - - b. Maximum of one - - P - P P P 29. Large animals, provided no animals are kept, maintained and raised for commercial purposes, limited as follows: See #1 See #1 - P † - - - a. Two large animals for the first 40,000 square feet of land area, except mules and donkeys which require 80,000 square feet for the first animal, 751 - 66 - Zoning Districts A A-1 R-1 RHS R1C R-2 R-3 Uses b. One additional large animal for each additional 20,000 square feet of land area, c. One additional large animal if said animal is raised for a 4H project, a project sponsored by a recognized agricultural organization or a school project, 30. The keeping of any animal not otherwise permitted above in #27, 28, and 29; - - - CUP – Admin. - - - 31. Riding academies, commercial stables, and the boarding of horses; CUP - CC CUP - CC - - - - - 32. Noncommercial stables, and the keeping of riding horses: a. Limited to three horses on each lot at any time except that additional foals may be retained for a period of six months; P P - - - - - b. In excess of the number permitted in 32(a) CUP – CC CUP – CC - - - - - 33. Cemeteries, crematoriums, mausolea, and columbariums CUP - CC CUP - CC - - - - - 34. Mines, quarries and gravel pits; CUP - CC CUP - CC - - - - - 35. Guest ranches; CUP - CC CUP - CC - - - - - 36. Public and quasi-public buildings and uses. CUP - CC CUP - CC - - - - - 37. Hog farms; Ex Ex - - - - - 38. Cattle farms mainly depending upon feed brought onto the property; Ex Ex - - - - - 39. Slaughterhouses, fertilizer yards, feed yards, boneyards or plants for the reduction of animal matter; Ex Ex - - - - - 40. Commercial feed sales; Ex Ex - - - - - 41. Other semiagricultural uses mainly depending upon raw materials, semifinished products, or feed brought on to the property; Ex Ex - - - - - 752 - 67 - Zoning Districts A A-1 R-1 RHS R1C R-2 R-3 Uses 42. Other agricultural uses which, in the opinion of the Director of Community Development, create a private or public nuisance. Ex Ex - - - - - Key: P – Permitted Use - – Not Allowed CUP – Admin. – Conditional Use Permit issued by the Director of Community Development CUP – PC – Conditional Use Permit issued by the Planning Commission CUP – CC – Conditional Use Permit issued by the City Council * May be permitted in locations where the use is compatible with existing and planned uses within the development area in the opinion of the Director of Community Development, † The required lot area for a large animal shall not be included in the required lot area for a household pet or vice versa, except that a maximum of two household pets may be kept with large animals, All animals must be kept and maintained in accordance with other Cupertino or Santa Clara County codes and ordinances, Ex - Excluded Uses 753 ATTACHMENT VI - 68 - CHAPTER 19.56: DENSITY BONUS Section 19.56.010 Purpose. 19.56.020 Applicability of Regulations. 19.56.030 Density Bonus. 19.56.040 Incentives/Concessions. 19.56.050 General Requirements. 19.56.060 Application Requirements. 19.56.070 Findings. 19.56.010 Purpose. The density bonus ordinance codified in this chapter is intended to comply with the State Density Bonus Law, Government Code Section 65915, which provides that a local agency shall adopt an ordinance specifying how the agency will comply with that section. 19.56.020 Applicability of Regulations. A. Housing developments resulting in a net increase of at least five units (excluding density bonus units) are eligible for a density bonus as provided in this chapter, when the applicant for the housing development agrees or proposes at least one of the following: 1. Construct: a. Ten percent of the total units affordable to lower income households at affordable rent or affordable housing cost; or b. Five percent of the total units affordable to very low income households at affordable rent or affordable housing cost; or c. Ten percent of the total units proposed in a common interest development for sale to moderate income households, provided that all units in the development are offered to the public for purchase; or d. A senior citizen housing development. 2. Donate land in accordance with Section 19.56.030C; 3. Provide affordable housing in a condominium conversion project in accordance with Section 19.56.030E. B. In addition to meeting the requirements of 19.56.020A, housing developments which include a child care facility in accordance with Section 19.56.030D, is entitle to an additional density bonus; C. An applicant may also submit a proposal for specific incentives or concessions to be granted in conjunction with the density bonus, as provided in Section 19.56.040; 754 - 69 - D. The granting of a density bonus, incentive or concession, in and of itself, shall not require a general plan amendment, zone change, or other discretionary approval and shall be reviewed concurrently with the review of the housing development. 19.56.030 Density Bonus A. Housing developments that meet the criteria in Section 19.56.020A(1) are eligible for a maximum density bonus as set forth in Table 19.56.030. Table 19.56.030: Density Bonus Calculations Percentage of Affordable Units Provided in Income Category Very Low Income Units Low Income Units Moderate Income Units 5% 20% - - 6% 22.5% - - 7% 25% - - 8% 27.5% - - 9% 30% - - 10% 32.5% 20% 5% 11% 35% 22% 6% 12% 35% 23% 7% 13% 35% 25% 8% 14% 35% 26% 9% 15% 35% 28% 10% 16% 35% 29% 11% 17% 35% 31% 12% 18% 35% 32% 13% 19% 35% 34% 14% 20% 35% 35% 15% 21% 35% 35% 16% 22% 35% 35% 17% 23% 35% 35% 18% 24% 35% 35% 19% 25% 35% 35% 20% 26% 35% 35% 21% 27% 35% 35% 22% 28% 35% 35% 23% 29% 35% 35% 24% 30% 35% 35% 25% 31% 35% 35% 26% 32% 35% 35% 27% 33% 35% 35% 28% 34% 35% 35% 29% 755 - 70 - Percentage of Affordable Units Provided in Income Category Very Low Income Units Low Income Units Moderate Income Units 35% 35% 35% 30% 36% 35% 35% 31% 37% 35% 35% 32% 38% 35% 35% 33% 39% 35% 35% 34% 40% 35% 35% 35% B. Senior housing developments are entitled to a maximum density bonus of 20 percent provided the development comprises of at least 35 units, conforms with Civil Code Section 51.3 and the units are reserved for qualifying residents. The development does not have to provide affordable units. C. Donation of Land: 1. When an applicant donates land to the City in accordance with the requirements of Section 19.56.020C(2), the development shall be entitled to a 15 percent density bonus. The development is entitled to an additional one percent density bonus for the donation of land that would allow the development of an additional one percent of affordable units above the minimum requirements in Section 19.56.020C(2), up to a maximum of 35 percent. 2. The donation of land must meet the following requirements: a. The land shall be donated and transferred no later than the date of approval of the application. b. The developable acreage and zoning classification of the land being transferred are sufficient to permit construction of units affordable to very low income households in an amount not less than 10 percent of the number of residential units of the proposed development. c. The transferred land is at least one acre in size or of sufficient size to permit development of at least 40 units, has the appropriate General Plan designation, is appropriately zoned with appropriate development standards for development at the density described in Government Code Section 65583.2(c)(3), and is or will be served by adequate public facilities and infrastructure. d. The transferred land shall have all of the permits and approvals, other than building permits, necessary for the development of the very low income housing units on the transferred land not later than the date of approval of the final subdivision map, parcel map, or residential development application, except that the City may subject the proposed development to subsequent design review to the extent authorized by Government Code Section 65583.2(i) if the design is not reviewed by the City prior to the time of transfer. 756 - 71 - e. The land shall be transferred to the City or to a housing developer approved by the City. The City may require the applicant to identify and transfer the land to the developer. f. The transferred land shall be within the boundary of the proposed development or, if the City agrees, within one-quarter mile of the boundary of the proposed development. g. A proposed source of funding for the very low income units shall be identified not later than the date of approval of the proposed development. h. The transferred land and the affordable units shall be subject to a deed restriction ensuring continued affordability of the units consistent with Government Code Section 65915(c)(1) or (2), as applicable. D. Provision of Child Day Care Facilities 1. When a housing development is proposed that contains affordable housing as provided in Section 19.56.030A and includes a child day care facility that will be located on the premises of, as part of, or adjacent to, the project, the City shall grant either of the following, except as specifically stated elsewhere: a. An additional density bonus in residential square footage that is equal to or greater than the square footage of the child day care facility. b. An additional concession or incentive that contributes significantly to the economic feasibility of the construction of the child day care facility in accordance with Section 19.56.040. 2. The City shall also require that as a condition of approving the housing development: a. The child day care facility shall remain in operation for a period of time that is as long as or longer than the period of time during which the affordable units are required to remain affordable. b. Of the children who attend the child day care facility, the children of very low income households, lower income households, or families of moderate income shall equal a percentage that is equal to or greater than the percentage of dwelling units that are required for very low income households, lower income households, or families of moderate income. 3. Notwithstanding any requirement of this subdivision, the City shall not be required to provide a density bonus or concession for a child day care facility if the City finds, based upon substantial evidence, that the community has adequate child day care facilities. E. Condominium Conversions 1. When an applicant for approval to convert apartments to a condominium project agrees to provide at least 33 percent of the total units of the proposed condominium project to low or moderate income households, or 15 percent of the total units of the proposed condominium project to lower income households, and agrees to pay for the reasonably necessary administrative costs incurred by the City, the City shall either: 757 - 72 - a. Grant a density bonus of 25 percent over the number of apartments to be provided within the existing structure or structures proposed for conversion; or b. Provide other incentives of equivalent financial value. This shall not require the City to provide cash transfer payments or other monetary compensation but may include the reduction or waiver of requirements which the City might otherwise apply as conditions of conversion approval. 2. The City may place such reasonable conditions on the granting of a density bonus or other incentives of equivalent financial value as the City finds appropriate, including but not limited to, conditions which assure continued affordability of units to subsequent purchasers who are persons and families of low and moderate income or lower income households. 3. An application shall be ineligible for a density bonus or other incentives under this section if the apartments proposed for conversion constitute a housing development for which a density bonus or other incentives were previously provided under Government Code Section 65915. 4. Nothing in this section shall be construed to require the City to approve a proposal to convert apartments to condominiums. F. Density Bonus Calculations: 1. A density bonus may be selected from only one income or development category listed above, except that density bonuses for land donation may be combined with others, up to a maximum of 35 percent, and an additional square-foot bonus may be granted for a child day care facility as provided in Section 19.56.030C. 2. In determining the number of density bonus units to be granted, any fractions of density bonus units shall be rounded up to the next whole number. 3. Density bonus units authorized by this section shall not be included when determining the number of affordable units, required to qualify for the density bonus. In determining the number of affordable units, any fractions of affordable units shall be rounded up to the next whole number. 4. An applicant may request a lower density bonus than the housing development is entitled to, but no reduction will be permitted in the percentage of required affordable units as shown in Section 19.56.020. 5. Regardless of the affordable units, no housing development will be entitled to a density bonus of more than 35 percent unless approved by the City pursuant to Section 19.56.030F(7). 6. The City, at its discretion, may grant additional density bonuses. While the maximum density bonus, the City is required to provide pursuant to State Law, is thirty-five (35) percent; this is not the maximum amount that an applicant may obtain. An applicant may negotiate with the City to obtain a density bonus higher than the maximum set forth in 758 - 73 - Table 19.56.030 in exchange for including even more affordable units than are provided in the table and/or the provision of other amenities or considerations. 7. For purposes of calculating a density bonus, the residential units do not have to be based upon individual subdivision maps or parcels. The density bonus shall be permitted in geographic areas of the housing development other than the areas where the affordable units are located. 19.56.040 Incentives and Concessions. A. A housing development is eligible for Incentives and Concessions as shown in Table 19.56.040A. Incentives and Concessions must be selected from only one category (very low, low, or moderate). No incentives are available for land donation or for a senior citizen housing development that is not affordable. Condominium conversions and day care centers may have one incentive or a density bonus, at the City's option, but not both. Table 19.56.040A: Incentives and Concessions Calculations: Unit Type Percent of Affordable Units Number of Incentives/Concessions Very Low Income Units 5% or greater 1 10% or greater 2 15% or greater 3 Low Income Units 10% or greater 1 20% or greater 2 30% or greater 3 Moderate Income Units 10% or greater 1 20% or greater 2 30% or greater 3 B. For purposes of this chapter, permissible concessions and incentives include, but are not limited to: 1. A reduction of development standards or a modification of zoning code requirements or architectural design requirements that exceed the minimum building standards approved by the California Building Standards Commission as provided in Part 2.5 (commencing with Section 18901) of Division 13 of the Health and Safety Code, including but not limited to, a reduction in setback requirements, square footage or parking requirements, such that the reduction or modification results in identifiable, financially sufficient, and actual cost reductions. 2. Approval of mixed-use zoning in conjunction with the housing project if commercial, office, industrial or other land uses will reduce the cost of the housing development, and if the commercial, office, industrial or other land uses are compatible with the housing project and the existing or planned development in the area where the proposed housing project will be located; 759 - 74 - 3. Other regulatory incentives or concessions proposed by the developer or the City, which result in identifiable financially sufficient and actual cost reductions. C. Nothing in this section requires the provision of direct financial incentives for the housing development, including but not limited to the provision of financial subsidies, publicly owned land by the City or the waiver of fees or dedication requirements. The City, at its sole discretion, may choose to provide such direct financial incentives; D. An applicant may submit to the City a proposal for the waiver or reduction of development standards that will have the effect of physically precluding the construction of a development meeting the criteria outlined in Section 19.56.020 at the densities or with the concessions or incentives permitted under this chapter. A proposal for the waiver or reduction of development standards shall neither reduce nor increase the number of incentives or concessions to which the applicant is entitled. The applicant shall bear the burden of demonstrating that the development standards that are requested to be waived will have the effect of physically precluding the construction of the housing development with the density bonuses and incentives. E. If the housing development is eligible for density bonus as provided in Section 19.56.020, upon request of the applicant, the maximum off-street parking standards that can be applied, inclusive of handicapped and guest parking are indicated in Table 19.56.040B. These may include tandem and uncovered parking spaces. Table 19.56.040B: Off-street parking standards with Number of bedrooms Maximum number of off-street parking spaces 0 – 1 One (1) 2 – 3 Two (2) 4 + Two and one-half (2.5) F. A housing development which requests incentives or concessions must show that the requested concessions are required to provide for affordable rents or affordable housing costs, as applicable. 19.56.050 General Requirements. A. Affordable for-sale and rental low and very low income units must remain affordable to low or very low income households, as applicable, for thirty years or for a longer period of time if required by a construction or mortgage financing assistance program, mortgage insurance program, or rental subsidy program. Affordable for-sale moderate income units must remain affordable to moderate-income households for the duration required by the City’s Residential Housing Mitigation Program or for a longer period of time if required by a construction or mortgage financing assistance program, mortgage insurance program, or rental subsidy program. Sales price for for-sale affordable very low, low, and moderate income units shall be set at affordable housing cost. Rents for affordable low and very low income rental units shall be set at an affordable rent. 760 - 75 - B. The affordable dwelling units and land dedication that qualify a housing development for a density bonus may also be used to meet the below-market-rate housing provisions of the City’s Residential Housing Mitigation Program, provided that the affordable units and land dedication comply with the requirements of both Chapter 19.56, Density Bonus, and the Residential Housing Mitigation Program regarding the required number of affordable units, required level of affordability, and term of affordability so as to provide the greatest affordability to the most households for the longest term. C. Unless otherwise governed by other funding sources, first priority for the affordable units will be given to individuals who reside, work, go to school, or have family in the City of Cupertino. D. A master regulatory agreement shall be made between the developer and the City which indicates the household type, number, location, size and construction scheduling of all affordable units, and such information as shall be required by the City for the purpose of determining the developer's compliance with this chapter. The regulatory agreement shall be recorded against the housing development prior to final or parcel map approval or, where a map is not being processed, prior to issuance of any building permits, and shall be binding on all future owners and successors in interest. E. Affordable units in a project and phases of a project shall be constructed concurrently with or prior to the construction of market-rate units. F. Affordable units shall be provided as follows: 1. Affordable units shall be dispersed throughout the project; 2. Affordable units shall be identical with the design of any market rate rental units in the project with the exception that a reduction of interior amenities for affordable units will be permitted upon prior approval by the City Council as necessary to retain project affordability. G. The developer shall submit a project financial report (pro forma) demonstrating that the requested incentives or concessions are required to provide for affordable rents or affordable housing costs, as applicable. The City may retain a consultant to review the financial report. The cost of the consultant shall be borne by the developer with the following exception: 1. If the applicant is a nonprofit organization, the cost of the consultant may be paid by the City upon prior approval of the City Council. H. All affordable units shall be occupied by the household type specified in the written agreement required under Section 19.52.050C. The developer’s obligation to maintain these units as affordable housing shall be evidenced by the master regulatory agreement which shall be recorded as deed restriction running with the land. I. Prior to the rental or sale of any affordable unit, the City or its designee, shall verify the eligibility of the prospective tenant or buyer. 761 - 76 - J. The City may establish fees associated with the setting up and monitoring of affordable units. K. For rental affordable very low and low income units: 1. The owner shall obtain and maintain on file certifications by each household. Certification shall be obtained immediately prior to initial occupancy by each household and annually thereafter, in the form provided by the City or its designee. The owner shall obtain updated forms for each household on request by the City, but in no event less frequently than once a year. The owner shall maintain complete, accurate and current records pertaining to the housing development, and will permit any duly authorized representative of the City to inspect the records pertaining to the affordable units and occupants of these units. 2. The owner shall submit an annual report to the City, on a form provided by the City. The report shall include for each affordable unit the rent, income, and family size of the household occupying the unit. 3. The owner shall provide to the City any additional information required by the City to insure the long-term affordability of the affordable units by eligible households. 19.56.060 Application Requirements. A. An applicant may submit a preliminary proposal for housing development pursuant to this chapter prior to the submittal of any formal application. B. All requests pursuant to this Chapter shall be submitted to the City concurrently with the application for the first discretionary permit or other permit required for the housing development and shall be process concurrently with the discretionary application following the review process as set forth for permits in Chapter 19.12, Administration of the Cupertino Municipal Code established by the City. The applicant shall provide additional information as specified in this chapter, specifically: 1. Provide a written statement specifying the desired density increase, incentives and any waivers requested, proposed rent schedules and/or sales prices, and the type, location, size and construction scheduling of all dwelling units; 2. Submit a project financial report (pro forma) demonstrating that the requested incentives will result in identifiable, financially sufficient, and actual cost reductions to the housing development and they are required to provide for affordable rents or affordable housing costs, as applicable. The pro forma shall include the capital costs, operating expenses, return on investment, loan-to-value ratio and the debt coverage ratio including the contribution(s) provided by any applicable subsidy program(s), as required; 3. An appraisal report indicating the value of the density bonus and of the incentive(s)/concession(s); 762 - 77 - 4. A use of funds statement identifying the financial gaps for the housing development with the affordable housing units. The analysis shall show how the funding gap relates to the incentive(s)/concession(s); 5. For any requested waiver of a development standard, evidence that the development standard for which the waiver is requested will have the effect of physically precluding the construction of the housing development with the density bonus and incentives requested. 6. If a mixed use building or project is proposed as an incentive, evidence that non- residential land uses will reduce the cost of the housing development and that the non- residential land uses are compatible with the development and the existing or planned development in the area. 7. If a density bonus is requested for a land donation, the location of the land to be dedicated, proof of site control, and evidence that each of the requirements included in Section 19.56.030C can be met. 8. If a density bonus or incentive is requested for a child care facility, evidence that all of the requirements in Section 19.56.030D can be met. 9. If a density bonus or incentive is requested for a condominium conversion, evidence that all of the requirements in Section 19.56.030E can be met. 10. Any other information requested by the Director of Community Development to determine if the required findings can be made. 19.56.070 Findings. A. Before approving an application that includes a request for a density bonus, incentive, parking reduction and/or waiver pursuant this chapter, the decision-making body shall make the following findings, as applicable: 1. A finding that the residential project is eligible for the density bonus and any incentives, parking reductions or waivers requested. 2. A finding that any requested incentive will result in identifiable, financially sufficient, and actual cost reductions based upon the financial analysis and documentation provided. 3. If the density bonus is based all or in part on donation of land, a finding that all the requirements included in Section 19.56.030C have been met. 4. If the density bonus or incentive is based all or in part on the inclusion of a child care facility, a finding that all the requirements included in Section 19.56.030D have been met. 5. If the density bonus or incentive is based on a condominium conversion, a finding that all the requirements included in Section 19.56.030E have been met. 6. If the incentive includes mixed-use development, a finding that all the requirements included in Section 19.56.040B(2) have been met. 763 - 78 - 7. If a waiver is requested, a finding that the development standards for which the waiver is requested would have the effect of physically precluding the construction of the housing development with the density bonus and incentives permitted. B. If the findings required by subsection (A) of this section can be made, the decision-making body may deny an application for an incentive or waiver requested pursuant to Section 19.56.040 only if it makes one of the following written findings as applicable to each type of application, supported by substantial evidence: 1. That the incentive is not required to provide for affordable rents or affordable sales prices; or 2. That the incentive or waiver would have an adverse impact on real property listed in the California Register of Historic Resources; or 3. That the incentive or waiver would have a specific, adverse impact upon public health or safety or the physical environment, and there is no feasible method to satisfactorily mitigate or avoid the specific adverse impact without rendering the residential project unaffordable to low and moderate income households. For the purpose of this subsection, "specific adverse impact" means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, written public health or safety standards, policies, or conditions as they existed on the date that the application for the residential project was deemed complete; or 4. That the incentive or waiver is contrary to state or federal law. C. If the findings required by subsection (A) of this section can be made, the decision-making body may deny an application for a density bonus or incentive that is based on the provision of child care only if it makes a written finding, based on substantial evidence, that the city already has adequate child care facilities. 764 ATTACHMENT VII - 79 - CHAPTER 19.76: PUBLIC BUILDING (BA), QUASI PUBLIC BUILDING (BQ) ANDTRANSPORTATION (T) ZONES Section 19.76.020 Applicability of Regulations. 19.76.030 Permitted, Conditional and Excluded Uses in BA, BQ and T Zones. 19.76.040 Permits Required for Development. 19.64.050 Application Requirements. 19.64.060 Site Development Regulations. 19.76.010 Purpose. The BA, BQ and T zoning districts are designed to accommodate governmental, public utility, educational, religious, community service, transportation, or recreational facilities in the City. 19.76.020 Applicability of Regulations. The specific regulations of this chapter shall apply to all BA, BQ and T zoning districts. 19.76.030 Permitted, Conditional and Excluded Uses in BA, BQ and T Zones. Permitted, Conditional and Excluded Uses that may be conducted from property zoned Public Building (BA), Quasi-Public Building (BQ), and Transportation (T) are identified in Table 19.76.030, Permitted, Conditional and Excluded Uses in Public, Quasi-Public and Transportation Zoning Districts. Table 19.76.030 – Permitted, Conditional, and Excluded Uses in BA, BQ and T Zones Zoning Districts BA BQ T Uses 1. Buildings and other uses on land owned or utilized by a federal, state, county, or city government or authority, or by a special district created for public purposes under the laws of the State of California are permitted in a BA zone. P - - 2. Rotating emergency shelter provided that the following conditions are met: a. Shelter is located within an existing church structure; b. The number of occupants does not exceed twenty-five; c. The hours of operation do not exceed six p.m. to seven a.m.; d. Adequate supervision is provided; e. Fire safety regulations are met; and f. Operation period does not exceed two months in any twelve- month period at any single location. - P - 3. Permanent emergency shelter provided the following conditions are met: a. Section 19.76.030(2)(b),(d), (e); - P - 765 - 80 - Zoning Districts BA BQ T Uses b. A management plan is provided which includes a detailed operation plan; c. Shelter is available to any individual or household regardless of their ability to pay; and d. Occupancy is limited to six months or less. 4. Public utility companies regulated by the Public Utility Commission for uses restricted to administrative and office buildings, communication equipment buildings, including parking, landscaping and maintenance within an enclosed area or storage yard; - CUP - PC - 5. Religious, civic, and comparable organizations, for uses restricted to church buildings, community halls, administrative buildings, schoolrooms, recreational facilities, and athletic fields, convents, seminaries, and similar uses customarily associated with churches, including parking and landscaping areas; - CUP – PC - 6. Child care facility, residential care facilities, congregate residence, hospitals, vocational and specialized schools; - CUP – PC - 7. Lodges, clubs, country clubs, including accessory uses such as swimming pools, picnic areas, golf courses, driving tees or ranges, miniature golf courses (all uses to be restricted to members of the above organizations and their guests); - CUP – PC - 8. Large-family daycare home; - CUP – PC - 9. Airports, airfields and helicopter terminals, including administration and service buildings, maintenance and storage yards - - CUP – PC 10. Railroads, including terminals and stations, freight yards, marshaling yards, storage yards, administrative and service buildings - - CUP – PC 11. Bus terminals and stations, including administration and service buildings, maintenance and storage yards - - CUP – PC 12. Freeways, expressways, and other roads with limited or controlled access, including administrative buildings and maintenance yards - - CUP – PC Key: P – Permitted Use - – Not Allowed CUP – Admin. – Conditional Use Permit issued by the Director of Community Development CUP – PC – Conditional Use Permit issued by the Planning Commission CUP – CC – Conditional Use Permit issued by the City Council Ex - Excluded Uses 766 - 81 - 19.76.040 Permits Required for Development. Prior to the erection of a new building or structure or enlargement or modification of an existing building, structure, or site (including landscaping and lighting) in a BA. BQ or T zoning district, the applicant for a building permit must obtain permits in accord with Chapter 19.12. 19.64.050 Application Requirements. Prior to the issuance of development permits, or any amendment thereto, an application shall be made that, in addition to the requirements in Chapter 19.12, shall include a development plan. The plan shall include: A. Types and heights of buildings/structures and location of areas where buildings are to be placed; B. A proposed system of public and private streets, including cross-sections for all types of streets; C. Landscape plans; D. Parking and loading plans as required by this title; E. Any other information, which the Director of Community Development requires in order to evaluate the effects of the proposed facilities on the surrounding areas. 19.64.060 Site Development Regulations. A. Maximum Height of Buildings and Structures. The height of buildings in BA, BQ and T zone districts is regulated by the development plan. B. Setbacks and Screening. 1. There are no minimum setbacks in BA, BQ or T zoning districts; provided, however, that the Planning Commission may establish minimum setbacks with respect to each individual application for a development permit or a conditional use permit in order to provide adequate light, air and visibility at intersections, and to provide general conformity with adjacent and nearby zones and lots, or to promote the general excellence of the development; 2. Adequate screening to limit noise, to reduce glare of lights, and to prevent obnoxious emissions shall be provided when deemed appropriate by the Planning Commission. 767 ATTACHMENT VIII - 82 - CHAPTER 19.84: PERMITTED, CONDITIONAL AND EXCLUDED USES IN OPEN SPACE, PARK AND RECREATION AND PRIVATE RECREATION ZONING DISTRICTS Section 19.84.010 Applicability of Regulations 19.84.020 Permitted, Conditional and Excluded Uses in Open Space, Park and Recreation and Private Recreation Zones 19.84.010 Applicability of Regulations No building or structure or land shall be used in an OS, PR and FP zoning district, otherwise than in conformance with the provisions of this chapter. 19.84.020 Permitted, Conditional and Excluded Uses in Open Space, Park and Recreation and Private Recreation Zones Table 19.84.020 sets forth the Permitted, Conditional and Excluded Uses in Open Space, Park and Recreation and Private Recreation zones. Table 19.84.020 – Permitted, Conditional and Excluded Uses in Open Space, Park and Recreation and Private Recreation Zones Zoning Districts OS PR FP Uses A. Low-intensity recreational uses such as hiking, birdwatching, walking, picnicking and other similar activities P P - B. Minor maintenance of vegetation such as mowing or trimming P P P C. Incidental gardening P P P D. The erection or maintenance of minor structures, such as fences, gates, culverts and drainage ditches. P P P E. Any legal nonconforming use as provided for in Chapter 19.140 of the City’s Ordinance Code P P P F. Temporary uses subject to regulations established by Chapter 19.160 CUP – Admin P CUP- Admin G. Noncommercial stables for riding horses CUP – Admin - - 768 - 83 - Zoning Districts OS PR FP Uses H. Artificial or constructed pools, ponds, lakes or streams CUP - Admin P CUP – PC I. Playgrounds CUP - Admin P CUP - PC J. Any other use which is compatible with open space or park and recreation and otherwise is in conformance with the purposes of the OS or PR zoning districts CUP - Admin P - K. Parks, and recreation facilities, as regulated by Title 13 of this code - P - L. Agricultural activities for educational and recreational purposes, such as community gardens and hobby farms - P - M. Single-family residences for the purpose of housing a caretaker for the park. The residence may take the form of a mobilehome as well as a permanent residential structure. - P - N. Accessory facilities and uses customarily incidental to permitted uses and otherwise conforming with the provisions of Chapter 19.92 of this title P P P O. Parking facilities as necessary for park usage - P - P. Outdoor Uses: 1. Equestrian center including riding academies, stables and horse rental, 2. Practice range for archery or firearms, 3. Golf course with or without driving range, 4. Swim and racquet club, 5. Swimming, diving or related sports center, 6. Picnic areas, 7. Racquet sports center for tennis, racquetball, badminton and similar activities, 8. Specialty outdoor activity center encompassing one or more of the following or similar uses: a. Roller skating, b. Skateboarding, c. Lawn bowling, bocce ball, d. Miniature golf, - - CUP – PC 769 - 84 - Zoning Districts OS PR FP Uses e. Waterslide, 9. Commercial athletic field for one or more of the following or similar uses: a. Baseball, softball or batting cage training, b. Football c. Soccer, d. Volleyball, e. Field hockey, f. Basketball, 10. Amusement parks with or without rides or live entertainment, 11. Bicycle motocross course/go-cart track or similar specialty raceway, but excluding facilities for racing of automobiles or motorcycles, 12. Air sports field for hang gliding, ultralight aircraft or ballooning, but excluding common carrier passenger aircraft service, 13. Other outdoor recreation uses which are found by the Director of Community Development to be of similar intensity and characteristics of use to those enumerated in this subdivision; - - - - CUP – PC CUP - PC Q. Indoor Uses: 1. Museums and galleries, 2. Theaters for film, stage or music entertainment, 3. Specialty indoor activity center encompassing one or more of the following or similar uses: a. Bowling, b. Video games, c. Pool, billiards, d. Martial arts, e. Ice or roller skating rink, 4. Personal fitness or sports training center with primary location of facilities and equipment enclosed within a structure, 5. Dancehall or facility for dance instruction, 6. Other indoor recreation uses which are found by the City Council or Planning Commission to be of similar intensity and characteristics of use to those enumerated in this subsection. - - CUP - PC 770 - 85 - Zoning Districts OS PR FP Uses R. Subsidiary Uses: 1. Competition and tournament facilities, including stadium seating, concession stands and box office/ticket sales for on-premises events only, 2. Restaurant without separate bar facility, 3. Repair shop, servicing equipment associated with the activities authorized under the principal use permit, 4. Retail sales of equipment and supplies customarily associated with the activities authorized under the principal use permit, 5. Caretaker’s or security officer’s residence 6. Other uses deemed by the Planning Commission or City Council to be subsidiary to the principal use authorized on the site. - - CUP - PC S. Card Clubs and similar businesses operating games of chance - - Ex T. Nightclubs - - Ex U. Other uses which are found by the Director of Community Development to be in conflict with the objective of the FP zoning district - - Ex Key: P – Permitted Use - – Not Allowed CUP – Admin. – Conditional Use Permit issued by the Director of Community Development CUP – PC – Conditional Use Permit issued by the Planning Commission CUP – CC – Conditional Use Permit issued by the City Council Ex - Excluded Uses 771 ATTACHMENT IX - 86 - CHAPTER 19.144: DEVELOPMENT AGREEMENTS Section 19.144.020 Purpose of Development Agreement. 19.144.030 Authority for Adoption. 19.144.040 Application Requirements. 19.144.050 Qualification as an Applicant. 19.144.060 Proposed Form of Development Agreement. 19.144.070 Contents of a Development Agreement. 19.144.080 Consistency with General and Specific Plans. 19.144.090 Public Hearing and Ordinance Required. 19.144.110 Findings. 19.144.120 Irregularity in Proceeding. 19.144.140 Time for and Initiation of Review. 19.144.150 Finding of Compliance–Appeal. 19.144.160 Finding of Noncompliance–Appeal. 19.144.170 Appeal of Determination. 19.144.190 Cancellation or Modification by Mutual Consent. 19.144.200 Cancellation by the City. 19.144.210 Rights of the Parties after Cancellation or Termination. 19.144.220 Rules Affecting Development Agreement. 19.144.230 Separate Procedure. 19.144.240 Effect of Development Agreement. 19.144.250 Construction. 19.144.260 Execution and Recordation of Development Agreement, Amendment or Cancellation. 19.144.270 Judicial Review–Time Limitation. 19.144.010 Findings and Declaration of Intent. A. The California Legislature in Section 65864 of the Government Code has found that the lack of certainty in the approval of development projects can result in a waste of resources, escalate the cost of housing and other development to the consumer, and discourage investment in and commitment to comprehensive planning which would make maximum efficient utilization of resources at the least economic cost to the public. The City Council finds and determines that under appropriate circumstances, development agreements will 772 - 87 - strengthen the public planning process, encourage private participation in comprehensive planning by providing a greater degree of certainty in that process, reduce the economic costs of development, allow for the orderly planning of public improvements and services and the allocation of costs therefor in order to achieve the maximum utilization of public and private resources in the development process, and assure, to the extent feasible, that appropriate measures to enhance and protect the environment of the City are achieved. . The City Council further finds that the lack of public facilities, including, but not limited to, streets, sewerage, transportation, drinking water, school, and utility facilities, is a serious impediment to the development of new housing. B. The City Council further finds and determines that the public safety, health, convenience, comfort, prosperity and general welfare will be furthered by the adoption of this chapter in order to provide a mechanism for the enactment of development agreements to accomplish the foregoing purposes and aims and the realization of the benefits. 19.144.020 Purpose of Development Agreement. Development agreements enacted pursuant to this chapter are to ensure to the applicant for a development project that upon approval of the project, the applicant may proceed with the project in accordance with existing policies, rules and regulations, and subject to specified conditions of approval, in order to implement the intent of the City Council in enacting this title. Development agreements will also ensure that all conditions of approval, including the construction of off-site improvements made necessary by such land developments, will proceed in an orderly and economical fashion to the benefit of the City. 19.144.030 Authority for Adoption. This chapter is adopted under the authority of Government Code Sections 65864 through 65869.5. 19.144.040 Application Requirements. An application for a development agreement shall include, in addition to the requirements of Chapter 19.12, Administration, a development agreement proposal as described in 19.144.060, Proposed Form of Development Agreement. 19.144.050 Qualification as an Applicant. Only a qualified applicant may file an application to enter into a development agreement. The Director of Community Development shall require an applicant to submit proof of his or her interest in the real property and of the authority of the agent to act for the applicant. This proof may include a title report, policy or guarantee, issued by a title company licensed to do business in the State evidencing the requisite interest of the applicant in the real property. B. Other Parties. In addition to the City and developer, any federal, State or local governmental agency or body may be included as a party to any development agreement. Any additional party shall be made a party to the development agreement pursuant to the provisions of the Joint Exercise of Powers Act (Government Code Section 6500, et seq.) providing for joint powers agreements, or provisions of other applicable federal, State or local law, in order to create a legally binding agreement between such parties. 773 - 88 - 19.144.060 Proposed Form of Development Agreement. Each application shall be accompanied by the form of development agreement proposed by the City. This requirement may be met by designating the City’s then standard form of development agreement as prepared by the City Attorney and including specific proposals for changes in or additions to the language of the standard form. The City’s Proposed Form of Development Agreement shall include the following: A. The parties to the development agreement; B. The nature of the applicant’s legal or equitable interest in the real property constituting such applicant as a qualified applicant under this chapter; C. A description of the development project sufficient to permit the development agreement to be reviewed under the applicable criteria of this chapter. Such description may include, but is not limited to, references to site and building plans, elevations, relationships to adjacent properties and operational data. Where appropriate, such description may distinguish between elements of the development project which are proposed to be fixed under the development agreement, those which may vary and the standards and criteria pursuant to which the same may be reviewed; D. An identification of the approvals and permits for the development project enacted to the date of or contemplated by the development agreement; E. The duration of the development agreement; F. The permitted uses of the property; G. The maximum height and size of the proposed buildings, and provisions for dedications of land for public purposes; H. A program and criteria for periodic review under this chapter; I. Appropriate provisions guaranteeing or securing performance of the development agreement on the part of the developer; J. Specific standards for periodic review of a development agreement; K. Specific standards to insure compliance by the parties to a development agreement; L. The Development Agreement may provide that construction shall be commenced within a specified time and that the project or any phase shall be commenced within a specified time and that the project and any phase be completed within a specified time. M. Information required in accord with Section 19.140.070, Content of a Development Agreement; N. Any other relevant information which may be deemed necessary by the Director of Community Development pursuant to this chapter. 774 - 89 - 19.144.070 Contents of a Development Agreement. A. A development agreement shall specify its duration, the permitted uses of the property, the density and/or intensity of use, the maximum height and size of proposed buildings, and provisions for reservation or dedication of land for public purposes. B. A development agreement shall attach and incorporate by reference all conditions of approval imposed by the City with respect to the development project. C. All development agreements shall contain an indemnity and insurance clause in form and substance acceptable to the City Attorney, requiring the developer to indemnify the City against claims arising out of the development process and limiting the developer’s sole remedy to specific performance and thereby eliminating any potential damages to be paid by the City under the development agreement; provided, that, these provisions do not violate applicable law or constitute a joint venture, partnership or other participation in business affairs of developer by the City. D. All development agreements, or any part of development agreements, may be subject to subsequent condemnation proceedings by the City. E. Community Benefits: At the discretion of the City Council, additional heights over the base height standard in gateways and nodes identified in the Special Areas Map (Fig. X of the General Plan) may be approved as shown in the Community Form Map (Fig. Y of the General Plan). In order to obtain additional height, a development should include the following community benefits. 1. Ground floor retail component; and 2. One or more of the following benefits equivalent to at least 15% of the increase in value of the site attributed to the increase in height, based on a pro-forma, prepared by the developer and peer-reviewed by the City. The cost to the City of the peer-review shall be paid for by the developer: a. Transportation and Mobility Improvements i. New or expanded bicycle and pedestrian facilities; ii. Transit improvements and/or amenities including adaptive traffic signal management systems; iii. Participation in a community shuttle program (to provide connections to major employment and community nodes, including community facilities and shopping). b. Public Entity or Facilities: Provide land or space for public entities, such as schools. c. Senior Housing. Provide at least 15% of housing for seniors, if the proposed project includes a residential component and is not already targeted towards seniors. d. Public Art and Cultural Facilities i. Construction of a new, or expansion to, a community facility (e.g. recreation center, teen facility, etc.) 775 - 90 - ii. Construction of a new, or expansion of, a community gathering space (e.g. meeting/conference space, cultural center or museum). e. Parks and Open Space i. New publicly accessible park and/or open space within a project in excess of park dedication requirements. ii. Dedication of land for a new or expanded park outside the project boundary in excess of park dedication requirements. f. Cash-in-Lieu Contribution. A Cash-in-Lieu contribution is a contribution made to the City by a developer or applicant and is equivalent to at least 15% of the increase in value of the site attributed to the increase in height achieved through the Community Benefits Program. The funds are allocated exclusively for purchase of land, capital improvements or operations related to items a, b, d, e, and towards the construction of affordable housing. All Cash-in-Lieu Contributions shall be made to the City. 19.144.080 Consistency with General and Specific Plans. Before the City Council may approve the development agreement, it must find that its provisions are consistent with the General Plan and any applicable specific plans of the City. If the City Council approves the development agreement in the form recommended by the Planning Commission, without further findings, then it shall be deemed to have also adopted the findings of the Planning Commission. 19.144.090 Public Hearing and Ordinance Required. A development agreement is a legislative act and shall be enacted by ordinance only after a public hearing before the City Council. The ordinance shall refer to and incorporate by reference the text of the development agreement. 19.144.110 Findings. A. Development Agreement shall be enacted by ordinance by the City Council upon making the following findings: B. Is consistent with the objectives, policies, general land uses and programs specified in the General plan and any applicable specific plan; C. Is compatible with the uses authorized in, and the regulations prescribed for, the land use district in which the real property is or will be located; D. Is in conformity with and will promote public convenience, general welfare and good land use practice; E. Will not be detrimental to the health, safety and general welfare; F. Will not adversely affect the orderly development of property or the preservation of property values; and G. Will promote and encourage the development of the proposed project by providing a greater degree of requisite certainty. 776 - 91 - 19.144.120 Irregularity in Proceeding. Formal rules of evidence or procedure which must be followed in a court of law shall not be applied in the consideration of a proposed development agreement under this chapter and the provisions of Chapter 19.12, Administration, shall provide the procedure for such consideration. No action, inaction or recommendation regarding the proposed development agreement shall be held void or invalid or be set aside by a court on the ground of the improper admission or rejection of evidence or by reason of any error, irregularity, informality, neglect or omission (“error”) as to any matter pertaining to the application, notice, finding, record, hearing, report, recommendation, or any matters of procedure whatever unless after an examination of the entire case, including the evidence, the court finds that the error complained of was prejudicial and that by reason of the error the complaining party sustained and suffered substantial injury, and that a different result would have been probable if the error has not occurred or existed. There is no presumption that error is prejudicial or that injury resulted if error is shown. 19.144.140 Time for and Initiation of Review. The Director of Community Development shall review the development agreement annually in order to ascertain the good faith compliance by the developer with its terms. The Developer shall submit documentation as required by the Director of Community Development to demonstrate good faith compliance by the developer of the terms of the development agreement. The time for review may be modified by the City Council at any time upon reasonable notice to the developer, and the development agreement may prescribe a procedure and standards and different times for review of compliance with its terms; provided, however, that a development agreement shall in any event be reviewed for compliance at least once every twelve months. 19.144.150 Finding of Compliance–Appeal. If the Director of Community Development finds good faith compliance by the developer with the terms of the development agreement, he or she may issue a certificate of compliance, which shall be in recordable form and may be recorded by the developer in the official records. The issuance of a certificate of compliance by the Planning Director and the expiration of the appeal period hereinafter specified without appeal, or the confirmation by the City Council of the issuance of the certificate on such appeal, shall conclude the review for the applicable period and such determination shall be final. 19.144.160 Finding of Noncompliance–Appeal. If the Planning Director, on basis of substantial evidence, finds the developer has not complied in good faith with the terms of the development agreement, he or she may specify in writing to the developer the respects, in which developer has failed to comply. The Director of Community Development shall also specify a reasonable time for the developer to meet the terms of compliance. If such areas of noncompliance are not perfected within the reasonable time limits as prescribed, the development agreement shall be subject to modification or cancellation by the City Council. 777 - 92 - 19.144.170 Appeal of Determination. Any interested person may file an appeal of the issuance of a certificate of compliance to the City Council within ten days after the certificate’s issuance. The developer may also file an appeal to the City Council of the finding of the Director of Community Development of noncompliance within ten days after the giving of notice of such determination. All appeals before the City Council shall be conducted pursuant to a noticed hearing in the same manner as any other appeal before the City Council, at which evidence shall be taken and findings made. 19.144.190 Cancellation or Modification by Mutual Consent. Any development agreement may be canceled or amended by mutual consent of the parties, but only in the manner provided in California Government Code Section 65868. Any proposal to cancel or amend a development agreement shall be heard and determined in accordance with the same procedures specified by this chapter for approval of a development agreement. 19.144.200 Cancellation by the City. A. The City Council shall conduct a noticed hearing on the recommendations of the Director of Community Development at which the developer and any other interested person shall be entitled to submit evidence and testimony as may be germane to the issue of the developer’s good faith compliance with the terms of the development agreement. If the City Council finds, based on substantial evidence, noncompliance with the terms and conditions of the development agreement, it may either cancel the development agreement upon giving sixty days’ notice to the developer, or in its discretion, may allow the development agreement to be continued by imposition of new terms and conditions intended to remedy noncompliance. The City Council may impose conditions to the action it takes as it considers necessary to protect the interests of the City. The decision of the City Council shall be final. B. Any cancellation or imposition of new terms and conditions pursuant to this section shall be noticed in accordance with the procedures specified in Chapter 19.12, Administration of this code. 19.144.210 Rights of the Parties after Cancellation or Termination. In the event that a development agreement should be canceled, or otherwise terminated, unless otherwise agreed, all rights of the developer, property owner or successors in interest under the development agreement shall terminate. Any and all benefits, including money or land, received by the City shall be retained by the City. Notwithstanding the above provision, any termination of the development agreement shall not prevent the developer from completing and occupying a building or other improvements authorized pursuant to a valid building permit previously approved by the City or under construction at the time of termination, but the City may take any action permitted by law to prevent, stop, or correct any violation of law occurring during and after construction, and the developer or any tenant shall not occupy any portion of the project or any building not authorized by a previously issued building permit. As used herein, “construction” means work under a valid building permit, and “completing” means completion for beneficial occupancy for developer's use, or if a portion of the project is intended for use by a lessee or tenant, then for such portion “completion” means completion 778 - 93 - except for interior improvements such as partitions, duct and electrical runouts, floor coverings, wall coverings, lighting, furniture, trade fixtures, finished ceilings, and other improvements typically constructed by or for tenants of similar buildings. All such uses shall, to the extent applicable, be deemed nonconforming uses and shall be subject to the nonconforming use provisions of the planning code. 19.144.220 Rules Affecting Development Agreement. All development agreements shall be subject to the regulation and requirements of the laws of the State, the Constitution of the United States and any codes, statutes or executive mandates and any court decisions, State or federal. In the event that any such law, code, statute, mandate or decision made or enacted after a development agreement has been entered into prevents or precludes compliance with one or more provisions of the development agreement, then such provisions of the development agreement shall be modified or suspended in the manner and pursuant to the procedures specified in the development agreement, as may be necessary to comply with such law, code, statute, mandate or decision. 19.144.230 Separate Procedure. All development agreements entail and consist of a separate procedure from other land use planning procedures and shall not take the place of the zoning ordinances, the General Plan, planned development permits, development permits, conditional use permits, subdivision approvals, building permits or any other City planning functions. If so specified in the development agreement, it shall constitute an approval pursuant to such planning procedures as if separately enacted under other City planning ordinances. To the extent practicable, public hearings on a proposed development agreement shall be held concurrently with the public hearings on all related land use approvals and all such approvals shall be made concurrently with the approval of the development agreement. 19.144.240 Effect of Development Agreement. When approved, the development agreement and any development control maps and all notations, references and regulations which are a part of the development agreement shall be part of the development agreement ordinance. Development control maps include, but are not limited to, regulations intended to carry out any plan respecting location or type of activities; height, bulk, siding or design of structures; location or design of open areas; and landscaping and other comparable regulations. 19.144.250 Construction. This chapter and any subsequent development agreement shall be read together. With respect to any development agreement enacted under this chapter, any provision of such a development agreement which is in conflict with this chapter shall be void. Unless otherwise provided by the development agreement, the City’s rules, regulations and official policies governing permitted uses of the land, governing density and governing design, improvement and construction standards and specifications applicable to development of the property subject to a development agreement shall be those City rules, regulations and official policies in force at the time of the approval of the development agreement by the City Council; provided, however, 779 - 94 - that the developer is subject to all increases in City imposed fees and charges with respect to subsequent applications for development and construction within the property subject to a development agreement. 19.144.260 Execution and Recordation of Development Agreement, Amendment or Cancellation. A. Within ten days after the ordinance approving the development agreement takes effect, the City Council shall execute the development agreement, and the City Council Clerk shall have the development agreement recorded with the County Recorder. B. If the parties to the development agreement or their successors in interest amend or cancel the development agreement as provided in Government Code Section 65868, and this chapter, or if the City Council terminates or modifies the development agreement as provided in Government Code Section 65865.1 and this chapter for failure of the developer to comply in good faith with the terms or conditions of the development agreement, the City Council Clerk shall, after such action takes effect, have notice of such action recorded with the County Recorder. 19.144.270 Judicial Review–Time Limitation. Any action or proceeding to attack, review, set, set aside, void or annul, any decision of the City pursuant to this chapter shall not be maintained by any person unless the action or proceeding is commenced within ninety days after the date of decision as provided in Section 1094.6 of the Code of Civil Procedure, State of California. 780 ATTACHMENT X - 95 - CHAPTER 19.172: BELOW MARKET RATE HOUSING PROGRAM Section 19.172.010 Purpose 19.172.020 Below Market Rate Housing Program Requirements 19.172.030 BMR Program Administration 19.172.010 Purpose The purpose of this chapter is to: A. Encourage the development and availability of housing affordable to a broad range of households with varying income levels within the city as mandated by State Law, California Government Code Sections 65580 and the City of Cupertino’s General Plan, including its Housing Element. B. Promote the city's goal to add affordable housing units to the city's housing stock in proportion to the overall increase in new jobs and market rate housing units. C. Mitigate the need for affordable housing created by new market-rate housing development and ensure that market-rate housing development does not utilize all land available in the city for affordable housing. D. Mitigate environmental and other impacts that accompany new residential and commercial development by protecting the economic diversity of the city's housing stock, with the goal of reducing traffic, transit and related air quality impacts, promoting jobs/housing balance and reducing the demands placed on transportation infrastructure in the region. E. Increase the supply of for-sale and rental housing for families and individuals employed in Cupertino whose incomes are insufficient to afford market rate housing. Since the historical rate of production of affordable housing in the city, by private developers is very low, the BMR program is essential to meet the city's need for affordable housing. 19.172.020 Below Market Rate (BMR) Housing Program Requirements A. Developers of housing development projects must comply with the requirements set forth in Residential Housing Mitigation Program of the City of Cupertino’s Housing Element of the General Plan. B. To the extent permitted by law, the City’s objective is to obtain actual affordable housing units within each development rather than off-site units or mitigation fee payments. Provision of off-site units, land donation, or payment of Housing Mitigation Fees may only be permitted as specified in the Residential Housing Mitigation Program rules and regulations. 781 - 96 - 19.172.030 BMR Program Administration A. The City Council shall adopt rules and regulations consistent with the provisions of this chapter and the Housing Element for the purpose of carrying out the administration of the Residential Housing Mitigation Program. Such rules and regulations shall address, but are not limited to, program eligibility requirements, affordable housing cost, income limits, preferences for housing applicants, minimum occupancy limits, waiting list procedures, buyer selection procedures, methodology for the calculation of affordable housing cost and affordable rent, resale restrictions and reasonable accommodations for disable applicants. The rules and regulations shall also address Residential Housing Mitigation Program components such as the provision of rental BMR units in for-sale housing developments or off-site BMR units. A copy of such policies, rules and regulations shall be on file and available for public examination in the office of the city clerk. B. Failure or refusal to comply with any such rules, regulations or agreements promulgated under this section shall be deemed a violation of this chapter. 782 - 1 - CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 14-213 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO APPROVING SPECIFIC PLAN AMENDMENTS TO THE HEART OF THE CITY SPECIFIC PLAN SECTION I: PROJECT DESCRIPTION Application No: SPA-2014-01 Applicant: City of Cupertino Location: Within the Heart of the City Specific Plan boundaries SECTION II: ENVIRONMENTAL REVIEW PROCESS WHEREAS pursuant to City Council direction to initiate a project to replenish, reallocate and increase citywide development allocations in order to plan for anticipated future development activity while keeping with the community’s character, goals, and objectives and to consolidate development requests by several property owners for amendments to the General Plan, under a comprehensive community vision, and WHEREAS, pursuant to State Housing Law, the City Council has directed staff to update the Housing Element of the General Plan and make associated zoning amendments to comply with State Law; and WHEREAS, immediately prior to the Council’s consideration of this Specific Plan amendment, and following the Commission’s recommendation, the Council adopted Resolution No. 6761, adopting a General Plan Amendment covering the properties which are the subject of this Specific Plan amendment; and WHEREAS, the Specific Plan amendment will be consistent with the City's General Plan land use map, proposed uses and surrounding uses; and WHEREAS, the Rezoning application is part of the General Plan Amendment, Housing Element Update and Associate Rezoning, all as fully described and analyzed in the June 2014 General Plan Amendment, Housing Element Update, and Associated Rezoning Project Environmental Impact Report (“Draft EIR”) (State Clearinghouse No. 2014032007), as amended by text revisions in the August 2014 General Plan Amendment, Housing Element Update and Associated Rezoning Project EIR Response to Comments Document (“Response to Comments Document”) and the Supplemental Text Revisions dated October 8, 2014 (together, the “Final EIR”); WHEREAS, the Final EIR was presented to the Planning Commission on September 9, 2014 at a Planning Commission Study Session; and WHEREAS, the Final EIR was presented to the City Council on October 7, 2014 at a City Council Study Session; and 783 - 2 - WHEREAS, the necessary public notices have been given as required by the procedural ordinances of the City of Cupertino and the Government Code, and the Planning Commission held public hearings on October 14, 2014 and October 20, 2014 to consider the project; and WHEREAS, based on substantial evidence in the administrative record, on October 20, 2014 the Planning Commission recommended that the City Council certify that the Final EIR has been completed in compliance with the California Environmental Quality Act, Public Resources Code Section 21000 et seq., and reflects the independent judgment and analysis of the City, adopt the Findings and Statement of Overriding Considerations, and implement all of the mitigation measures for the Project that are within the responsibility and jurisdiction of the City that are identified in Findings (Resolution 6760); and WHEREAS, on October 14, 2014, the Planning Commission recommended on a 4-0-1 (Takahashi absent) vote that the City Council adopt the General Plan Amendment (GPA-2013-01) (Resolution no. 6761); authorize staff to forward the Draft Housing Element to the State Department of Housing and Community Development for review and certification (GPA-2013- 02); approve the prioritized list of potential Housing Element sites in the event amendments are needed to the proposed Housing Element sites upon HCD review (Resolution no. 6762); approve the Zoning Map Amendments, Z-2014-03, in substantially similar form to the Resolution presented (Resolution no. 6763); approve the Municipal Code Amendments to make changes to conform to the General Plan and Housing Element and other clean up text edits (MCA-2014-01) (Resolution no. 6764); approve the Specific Plan Amendments, SPA-2014-01, in substantially similar form to the Resolution presented (Resolution no. 6765); and WHEREAS, upon due notice, the City Council has held at least one public hearing to consider the amendments to the Municipal Code be granted; and WHEREAS, the Cupertino City Council is the decision-making body for this Resolution; WHEREAS, after consideration of evidence contained in the entire administrative record, at the public hearing on November 10, 2014, the City Council adopted Resolution No. 14-210 certifying the EIR, adopting Findings and a Statement of Overriding Considerations, adopting Mitigation Measures, and adopting of a Mitigation Monitoring and Reporting Program. WHEREAS, prior to taking action on this Resolution, the City Council has exercised its independent judgment in carefully considering the information in the EIR and finds that scope of this Resolution falls within the previously certified EIR and that the rest of the amendments proposed in the Resolution do not constitute a project under CEQA, are exempt and no further environmental review is required; and BASED UPON THE FOREGOING, and after careful consideration of the, maps, facts, exhibits, testimony and other evidence submitted in this matter, the City Council finds: 1. That the amendment to the Heart of the City Specific Plan is consistent with the intent of the goals and policies of the General Plan as a whole, and is not inconsistent with any element thereof; 784 - 3 - 2. That the amendment to the Heart of the City Specific Plan is necessary to prescribe reasonable controls and standards for affected land uses to insure compatibility and integrity of those uses with other established uses; 3. That the amendment to the Heart of the City Specific Plan is necessary to provide reasonable property development rights while protecting environmentally sensitive land uses and species; 4. That the amendment to the Heart of the City Specific Plan is necessary to correct discrepancies in standards or policies within the plan area or land use category; and 5. That the amendment to the Heart of the City Specific Plan is necessary to protect the general health, safety, or general welfare of the community as a whole. NOW, THEREFORE, BE IT RESOLVED: 1. Section 1.01.020.B of the Heart of the City Specific Plan is amended to read: “Residential density shall be per the General Plan Land Use and zoning maps. On sites with a mixed-use residential designation, residential is a permitted use only on Housing Element sites. Conditional use permits will be required for residential units on mixed-use Housing Element sites that propose units above the estimates in the Housing Element, and on Non- Housing Element mixed-use sites. In mixed residential and commercial developments, the preferred location for residential units shall be behind primary street fronting retail/commercial uses. Secondarily, residential units may be located above the ground level on multi-story buildings. The amount of building space devoted to retail/commercial uses shall be such that the retail/commercial uses shall have a viable and substantial retail component.”; and 2. Section 1.01.030(A)(2) of the Heart of the City Specific Plan is amended to read: The primary bulk of the building shall be maintained below a 1:1 slope line drawn from the arterial street cub line or lines in all areas subject to the Heart of the City standards except for the Crossroads area. See the Crossroads Streetscape Plan for details. 3. Heart of the City Specific Plan Land Use Map is amended as shown in Exhibit SPA-1. 4. Heart of the City Zoning Map is amended as shown in Exhibit SPA-2 PASSED AND ADOPTED this 10th day of November 2014, at a Special Meeting of the City Council of the City of Cupertino by the following roll call vote: AYES: NOES: ABSTAIN: ABSENT: 785 - 4 - ATTEST: APPROVED: Grace Schmidt Gilbert Wong City Clerk Mayor, City of Cupertino 786 Civic Center Node 787 Partial South De Anza Blvd Conceptual Plan Area 788 RESOLUTION NO. 6760 OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO RECOMMENDING CERTIFICATION OF AN ENVIRONMENTAL IMPACT REPORT FOR THE GENERAL PLAN AMENDMENT, HOUSING E LEMENT UPDATE, AND ASSOCIATED REZONING PROJECT; AND ADOPTION OF FINDINGS AND A STATEMENT OF OVERRIDING CONSIDERATIONS, MITIGATION MEASURES, AND A MITIGATION MONITORING AND REPORTING PROGRAM CONSISTENT WITH ITS RECOMMENDATION OF THE PROJECT SECTION I: PROJECT DESCRIPTION Application No: EA-2013-03 Applicant: City of Cupertino Location: Citywide SECTION II: ENVIRONMENTAL REVIEW PROCESS WHEREAS pursuant to City Council direction to initiate a project to replenish, reallocate and increase citywide development allocations in order to plan for anticipated future development activity while keeping with the community’s character, goals, and objectives, and to consolidate development requests by several property owners for amendments to the General Plan, both under a comprehensive community vision, and WHEREAS, pursuant to State Housing Law, the City Council has directed staff to update the Housing Element of the General Plan and make associated zoning amendments to comply with State Law; and WHEREAS, pursuant to the provisions and requirements of the California Environmental Quality Act of 1970 (Public Resources Code Section 21000 et seq.) (“CEQA”) and the State CEQA Guidelines (Title 14, Sections 15000 et seq . of the California Code of Regulations) (“CEQA Guidelines”), the City of Cupertino as lead agency caused the General Plan Amendment, Housing Element Update and Associated Rezoning Final Environmental Impact Report (SCH#20140322007) (“EIR”) to be prepared; and WHEREAS, on March 5, 2014, the City issued Notice of Preparation for the EIR for the Project. A scoping session was held on March 11, 2014 to provide the public the opportunity to comment on the topics to be studied in the Draft Environmental Impact Report (“Draft EIR”). Public comments were collected through the scoping period’s conclusion on April 7, 2014; and WHEREAS, from April 8, 2014 to June 17, 2014, the City prepared a Draft EIR pursuant to the requirements of CEQA and the CEQA Guidelines; and WHEREAS, the Draft EIR was released for a 45-day public review/comment period beginning on June 18, 2014 and ending August 1, 2014 ; and 789 Resolution No. 6760 EA-2013-03 October 20 , 2014 Page -2- WHEREAS, the Notice of Completion of the Draft EIR was sent to the State Clearinghouse in the Governor’s Office of Planning and Research on June 18, 2014 under State Clearinghouse No. 2014032007 , and the Notice of Availability was filed with the Santa Clara County Clerk - Recorder on the same day and was also: (1) sent to other potentially affected agencies as required by CEQA; (2) sent to adjacent property owners as required by CEQA; and (3) posted at the Project site and at City Hall; and WHEREAS, on June 24, 2014, the City held a duly noticed public meeting during the public comment period on the Draft EIR to allow the public an additional opportunity to provide input on the DEIR and received public testimony; and WHEREAS, following the close of the public review and comment period on the Draft EIR, responses to written comments concerning the adequacy of the DEIR received during the public review and comment period have been prepared and compiled in the Response to Comments Document, which includes revisions to the DEIR (“RTC Document”); and WHEREAS, the RTC Document was issued on August 28, 2014 and notice of availability was sent to the Santa Clara County Clerk Recorder’s Office, posted at City Hall and the Project site, and sent to 10 local libraries and interested persons registered through the project website; and WHEREAS, copies of the RTC Document were sent to all public agencies that commented on the D raft EIR; and WHEREAS, the City received comments on the Draft EIR following the close of the public review and comment period (“Late Comments”) and, although pursuant to Public Resources Code Section 21091(d)(1) and CEQA Guidelines Section 15088(a) written responses are not required, responses to Late Comments have been provided with staff reports; and WHEREAS, pursuant to Cupertino Municipal Code Section 2.86.100, the Housing Commission is authorized to assist the Planning Commission and the City Council in developing housing policies and strategies for implementation of general plan housing element goals; and WHEREAS, the necessary public notices have been given as required by the procedural ordinances of the City of Cupertino and the Government Code, the Housing Element and proposed amendments to the Cupertino Municipal Code pertaining to housing and affordable housing, were presented to the Housing Commission at a public hearing on August 28, 2014; and WHEREAS, on August 28, 2014, the Housing Commission recommended that the City Council authorize staff to forward the Draft Housing Element to the State Department of Housing and Community Development (HCD) and use the High-Low prioritization of Potential Housing Element Sites; WHEREAS, the necessary public notices have been given as required by the procedural ordinances of the City of Cupertino and the Government Code, the Draft EIR, the RTC 790 Resolution No. 6760 EA-2013-03 October 20 , 2014 Page -3- Document, and all documents incorporated therein were presented to the Planning Commission on September 9, 2014 at a Planning Commission Study Session; and WHEREAS, on October 2, 2014, City Staff presented the Draft EIR and the RTC Document, and all documents incorporated therein, to the Environmental Review Committee (“ERC”) for review and recommendation. After considering the documents, and Staff’s presentation, the ERC recommended that the City of Cupertino City Council approve the Project; and WHEREAS, Supplemental Text Revisions to the General Plan Amendment, Housing Element Update and Associated Rezoning, which is part of the Final EIR, identifies revisions which are typographical corrections, insignificant modifications, amplifications and clarifications of the Draft EIR and the RTC Document; and WHEREAS, the “Final EIR” consisting of the Draft EIR (published in June 2013), the RTC Document (published in September 2013), and Supplemental Text Revisions and all documents incorporated therein was presented to the City Council on October 7, 2014 at a City Council Study Session; and WHEREAS, the necessary public notices have been given as required by the procedural ordinances of the City of Cupertino and the Government Code, and the Planning Commission held a public hearing on October 14, 2014 and October 20, 2014 to consider the project . NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony, staff reports, public comments, other evidence submitted in this matter, and the substantial evidence in the record, the Planning Commission recommend s that the City Council: 1. Certify that the Final EIR for the Project has been completed in compliance with the California Environmental Quality Act, Public Resources Code Section 21000 et seq., and reflects the independent judgment and analysis of the City. 2. Adopt Findings and a Statement of Overriding Considerations with regard to the significant effects of the Project as recommended by the Planning Commission on October 20, 2014 for approval by the City Council (“Recommended Project”); . 3. Adopt and incorporate into the Recommended Project a ll of the mitigation measures for the Recommended Project that are within the responsibility and jurisdiction of the City that are identified in the Findings. 4. Adopt the Mitigation Monitoring and Reporting Program for the Recommended Project. 791 Resolution No. 6760 EA-2013-03 October 20 , 2014 Page -4- PASSED AND ADOPTED this 20 th day of October, 2014 , Regular Meeting of the Planning Commission of the City of Cupertino, State of California, by the following roll call vote: AYES: COMMISSIONERS: Chair Brophy, Vice Chair Lee, Gong, Sun NOES: COMMISSIONERS: none ABSTAIN: COMMISSIONERS: none ABSENT: COMMISSIONERS: Takahashi ATTEST: APPROVED: /s/Aarti Shrivastava /s/Paul Brophy Aarti Shrivastava Paul Brophy, Chair Assistant City Manager Planning Commission 792 GPA -2013 -01 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 6761 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO RECOMMENDING APPROVAL OF GENERAL PLAN AMENDMENT TO REALLOCATE AND REPLENISH DEVELOPMENT ALLOCATION, AMEND THE GENERAL PLAN LAND USE MAP AND DEVELOPMENT STANDARDS, COMPLY WITH STATE LAW AND REORGANIZATION AND IMPROVE PRESENTATION AND READABILITY The Planning Commission recommends that the City Council, in substantially similar form to the Draft Resolution attached hereto as Exhibit GPA, adopt the proposed General Plan Amendments with the following amendments to Exhibit GPA-1 and corresponding amendments to GPA -2: 1. Citywide Development Allocation (Table LU -1) on page LU -14: a. Office: Allow a 500,000 sf increase to the citywide allocation pool. Eliminate the Major Employers allocation pool. b. Residential: Eliminate residential allocation 2. Eliminate Policy LU -1.3: Community Benefits Program 3. Edit Figure LU -1 for Heights and Densities in Planning Areas on page LU -18 as follows: Heart of the City Special Area Oaks Gateway − 45 ft. − 25 du/ac Glenbrooks (if HE site) − 45 ft. − 23 du/ac North Crossroads Node − 45 ft. or 60 ft. with retail − 25 du/ac − 35 du/ac if HE site City Center − 45 ft. − 25 du/ac North De Anza Blvd Special Area − 60 ft. − 25 du/ac Vallco Shopping District West of Wolfe Road − 45 ft.; or 60 with retail − 35 du/ac East of Wolfe Road − 60 ft.; or 75 ft. with retail − 35 du/ac Homestead Special Area North De Anza Gateway − 45 ft.; or 60 ft. with retail; or 90 ft. for a hotel with major convention center with capacity for 500 people 793 - 2 - Stelling Gateway (east of Stelling) − 45 ft. − 35 du/ac North Vallco Park Special Area N. Vallco Gateway (west of Wolfe Rd.) − 60 ft. − 25 du/ac N. Vallco Gateway (east of Wolfe Rd. – Hamptons site) − 75 ft. (buildings located within 50 ft. of property lines abutting Wolfe Rd, Pruneridge Ave. & Apple Campus 2 site shall not exceed 60 ft.). − 25 du/ac − 103 du/ac if HE site South De Anza Blv d Special Area − 45 ft. for Summerwinds/ Granite Rock if HE site − 25 du/ac 4. Vallco Shopping District Special Area on Page LU -56: Strategy LU -19.1.4: Land Use: Uses allowed on the site may include a mix of the following uses: a. Retail: High performing major retail with entertainment and restaurant uses b. Hotel: 5 -star hotel with a major convention center c. Residential: On upper floors with retail and active uses on the ground floor. Encourage a mix of units for young professionals, couples and/or active seniors who like to live in an active “town center” environment. d. Office: High -quality office space arranged in a pedestrian -oriented street grid with active uses on the ground floor, publicly-accessible streets and plazas/green space. 5. Associated text amendments to reflect the changes identified in Items #1 -3. PASSED AND ADOPTED this 20 th day of October, 2014 , Regular Meeting of the Planning Commission of the City of Cupertino, State of California, by the following roll call vote: AYES: COMMISSIONERS: Chair Brophy, Vice Chair Lee, Gong, Sun NOES: COMMISSIONERS: none ABSTAIN: COMMISSIONERS: none ABSENT: COMMISSIONERS: Takahashi ATTEST: APPROVED: /s/Aarti Shrivastava /s/Paul Brophy Aarti Shrivastava Pau l Brophy, Chair Assistant City Manager Planning Commission 794 GPA -2013 -02 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 6762 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO RECOMMENDING THAT CITY COUNCIL AUTHORIZE SUBMITTAL OF THE DRAFT HOUSING ELEMENT TO THE STATE DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENT (HCD) FOR REVIEW AND CERTIFICATION AND USE OF THE PRIORITIZED LIST OF POTENTIAL HOUSING ELEMENT SITES WITH THE HCD, IF NEEDED The Planning Commission hereby recommends that the City Council, in substantially similar form to the draft Resolution , attached hereto as Attachment HE, authorize: 1. Submittal of the draft housing element and technical appendix to the State Department of Housing and Community D evelopment for review and certification (Application No. GPA- 2013 -01) with the following amendments related to the recommended Priority Housing Sites: No. Site Name Density and Realistic Capacity (85% of max. density) Recommended Housing Element Sites 1. The Oaks 25 du/ac (150 du maximum) 2. Hamptons (342 units existing) 103 du/ac (748 du additional) 3. United Furniture + other 25 du/ac (103 du) 4. Barry Swenson 25 du/ac (11 du) 5. Glenbrooks (517 units existing) 23 du/ac (228 additional) 6. Summerwinds & Granite Rock 25 du/ac (96 du) 2. Use of the prioritized list of potential housing element sites with the HCD, if needed as follows: No. Site Name Density and Realistic Capacity (85% of max. density) 1. Villages (468 units existing) 2 0 du/ac (62 du additional) 2. Marina Plaza 35 du/ac (204 du) 3. Carl Berg 25 du/ac (169 du) 795 - 2 - PASSED AND ADOPTED this 20 th day of October 2014, at a Regular Meeting of the Planning Commission of the City of Cupertino by the following roll call vote: AYES: COMMISSIONERS: Chair Brophy, Vice Chair Lee, Sun, and Gong NOES: COMMISSIONERS: none ABSTAIN: COMMISSIONERS: none ABSENT: COMMISSIONERS: Takahashi ATTEST: APPROVED: /s/Aarti Shrivastava /s/Paul Brophy Aarti Shrivastava Paul Brophy, Chair Assistant City Manager Planning Commission 796 Z-2013-03 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 6763 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO RECOMMENDING APPROVAL OF REZONING FOR CERTAIN SITES IN THE CITY FOR CONFORMANCE WITH THE GENERAL PLAN AND HOUSING ELEMENT The Planning Commission recommends approval of the rezoning to the City of Cupertino Municipal Code with the findings reflected in the Draft Ordinance attached hereto as Exhibit Z amended as follows: 1. Exhibit Z -3 amended with the following edits APN Current Zoning Zoning if selected as a Priority Housing Site Zoning if NOT selected as a Priority Housing Site Density if NOT selected as a Priority Housing Site Density if selected as a Priority Housing Site 316-06-032 P(Res – 70) P(Res) P(Res) 25 du/ac. 99 du/ac. 316-06-037 P(Res – 70) P(Res) P(Res) 25 du/ac. 99 du/ac. 326-27-036 R3 (10 -20) R3 R3 (10 -20) 10-20 du/ac. 10-23 du/ac. 326-27-037 R3 (10 -20) R3 R3 (10 -20) 10-20 du/ac. 10-23 du/ac. 316-20-080 P(CG ) P(Regional Shopping, OP, Res ) P(Regional Shopping, OP, Res ) 35 du/ac. 35 du/ac. 316-20-081 P(CG ) P(Regional Shopping, OP, Res ) P(Regional Shopping, OP, Res ) 35 du/ac. 35 du/ac. 316-20-082 P(CG ) P(Regional Shopping, OP, Res ) P(Regional Shopping, OP, Res ) 35 du/ac. 35 du/ac. 316-20-101 P(Regional Shopping) P(Regional Shopping, OP, Res ) P(Regional Shopping, OP, Res ) 35 du/ac. 35 du/ac. 316-20-104 P(Regional Shopping) P(Regional Shopping, OP, Res ) P(Regional Shopping) 35 du/ac. 35 du/ac. 316-20-105 P(Regional Shopping) P(Regional Shopping, OP, Res ) P(Regional Shopping, OP, Res ) 35 du/ac. 35 du/ac. 316-20-106 P(Regional Shopping) P(Regional Shopping, OP, Res ) P(Regional Shopping, OP, Res ) 35 du/ac. 35 du/ac. 316-20-107 P(Regional Shopping) P(Regional Shopping, OP, Res ) P(Regional Shopping, OP, Res ) 35 du/ac. 35 du/ac. 797 - 2 - 326-27-039 P(CG) P(CG, Res) P(CG) 2 5 du/ac. 25 du/ac. 326-27-040 P(CG) P(CG, Res) P(CG) 2 5 du/ac. 25 du/ac. 326-27-041 P(CG) P(CG, Res) P(CG) 2 5 du/ac. 25 du/ac. “Common Area” identified in Santa Clara County Assessor Office Book 326, Page 27 for Effective Roll Year 2014-2015 surrounded by APN: 326-27-039, 326-27-040 & 326-27- 041 P(CG) P(CG, Res) P(CG) 2 5 du/ac. 25 du/ac. PASSED AND ADOPTED this 20th day of October 2014, at a Regular Meeting of the Plann ing Commission of the City of Cupertino by the following roll call vote: AYES: COMMISSIONERS: Chair Brophy, Vice Chair Lee, Sun, and Gong NOES: COMMISSIONERS: none ABSTAIN: COMMISSIONERS: none ABSENT: COMMISSIONERS: Takahashi ATTEST: APPROVED: /s/Aarti Shrivastava /s/Paul Brophy Aarti Shrivastava Paul Brophy, Chair Assistant City Manager Planning Commission 798 MCA -2014 -01 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 6764 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO RECOMMENDING APPROVAL OF THE PROPOSED MUNICIPAL CODE AMENDMENTS REGARDING HOUSING AND OTHER ZONING CODE AMENDMENTS FOR CLEAN-UP AND CONSISTENCY The Planning Commission recommends approval of the Municipal Code Amendments to the City of Cupertino Municipal Code with the findings reflected in the Draft Ordinance attached hereto as Exhibit MCA. PASSED AND ADOPTED this 20th day of October 2014, at a Regular Meeting of the Planning Commission of the City of Cupertino by the following roll call vote: AYES: COMMISSIONERS: Chair Brophy, Vice Chair Lee, Sun, and Gong NOES: COMMISSIONERS: none ABSTAIN: COMMISSIONERS: none ABSENT: COMMISSIONERS: Takahashi ATTEST: APPROVED: /s/Aarti Shrivastava /s/Paul Brophy Aarti Shrivastava Paul Brophy, Chair Assistant City Manager Planning Commission 799 SPA -2014-01 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESOLUTION NO. 6765 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO RECOMMENDING APPROVAL OF A SPECIFIC PLAN AMENDMENT TO THE HEART OF THE CITY SPECIFIC PLAN The Planning Commission recommends that the City Council, in substantially similar form to the Draft Resolution attached hereto, as Exhibit SPA, adopt the proposed Specific Plan Amendments with the following amendments: 1. Make conforming edits to Exhibit SPA-2 to reflect the Planning Commission’s recommendation for application Z-2013 -03 regarding Vallco Shopping District. PASSED AND ADOPTED this 20th day of October 2014, at a Regular Meeting of the Planning Commission of the City of Cupertino by the following roll call vote: AYES: COMMISSIONERS: Chair Brophy, Vice Chair Lee, Sun, and Gong NOES: COMMISSIONERS: none ABSTAIN: COMMISSIONERS: none ABSENT: COMMISSIONERS: Takahashi ATTEST: APPROVED: /s/Aarti Shrivastava /s/Paul Brophy Aarti Shrivastava Paul Brophy, Chair Assistant City Manager Planning Commission 800 I-1 EXHIBIT EA-1 (ALTERNATE) CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS AND STATEMENT OF OVERRIDING CONSIDERATIONS FOR GENERAL PLAN AMENDMENT, HOUSING ELEMENT UPDATE, AND ASSOCIATED REZONING I. INTRODUCTION The City of Cupertino (City), as lead agency under the California Environmental Quality Act (CEQA), Public Resources Code Section 21000 et seq., has prepared the Final Environmental Impact Report for the General Plan Amendment, Housing Element Update, And Associated Rezoning (the “Project”) (State Clearinghouse No. 2014032007) (the “Final EIR” or “EIR”). The Final EIR is a program-level EIR pursuant to Section 15168 of the State CEQA Guidelines.1 The Final EIR consists of Volumes I and II of the June 2014 Public Review Draft Project Environmental Impact Report (the “Draft EIR”); the August 2013 Response to Comments Document; and the November 3, 2014 Supplemental Text Revisions memorandum,2 which contains typographical corrections, insignificant modifications, amplifications and clarifications of the EIR. In determining to approve the Project, which is described in more detail in Section II, below, the City makes and adopts the following findings of fact and statement of overriding considerations, and adopts and makes conditions of project approval the mitigation measures identified in the Final EIR, all based on substantial evidence in the whole record of this proceeding (administrative record). Pursuant to Section 15090(a) of the State CEQA Guidelines, the Final EIR was presented to the City Council, the City Council reviewed and considered the information contained in the Final EIR prior to making the findings in Sections II through XIII, below, and the City Council determined that the Final EIR reflects the independent judgment of the City. The conclusions presented in these findings are based on the Final EIR and other evidence in the administrative record. II. PROJECT DESCRIPTION (the ”Balanced Plan”) As fully described in Chapter 3 of the Draft EIR, the Balanced Plan (also, the “Project”) involves all of the following: (1) a focused General Plan Amendment consisting of revised 1 The State CEQA Guidelines are found at California Code of Regulations, Title 14, Section 15000 et seq. 2 PlaceWorks, Supplemental Text Revisions to the General Plan Amendment, Housing Element Update and Associated Rezoning Project Final Environmental Impact Report (EIR) (November 3, 2014) (“Supplemental Text Revisions”). 801 I-2 city-wide development allocations for office commercial, hotel and residential uses, as well as buildings heights and densities for Major Mixed-Use Special Areas; (2) updating the General Plan Housing Element to accommodate the Regional Housing Needs Allocation (RHNA) for the 2014-2022 planning period to meet the City’s fair-share housing obligation of 1,064 units; (3) amending certain Zoning and Density Bonus portions of the City’s Municipal Code to be consistent with the Housing Element and to be consistent with requirements pertaining to emergency shelters; and (4) conforming changes to the General Plan Land Use Map, Zoning Ordinance and Zoning Map for consistency and for revisions required by State law, and reorganization for purposes of increasing clarity and ease of use. The increased development allocations would be allowed in specific locations throughout the City, which are categorized as follows and are described and depicted on figures in the EIR: • Special Areas (including City Gateways and Nodes along major transportation corridors); • Study Areas; • Other Special Areas (including Neighborhoods and Non-Residential/Mixed- Use Special Areas); and • Housing Element Sites The buildout of the potential future development in these identified locations is based on a horizon year of 2040; therefore, the EIR analyzes growth occurring between 2014 and 2040. The 2040 horizon year is generally consistent with other key planning documents, including Plan Bay Area, which is the Bay Area’s Regional Transportation Plan/ Sustainable Community Strategy to Senate Bill 375, the Sustainable Communities and Climate Protection Act. The EIR analyzed the proposed Project (which is “Land Use Alternative C”)3 and three additional alternatives (No Project Alternative, Land Use Alternative A, and Land Use Alternative B), all at the same level of detail. The Balanced Plan is a revised version of Alternative C consisting of the same development allocations and Housing Element sites that were analyzed in the EIR for Alternative C, except, as described in more detail in the next section below, that the office allocation is reduced to the amount analyzed in the EIR for Alternative B, and the maximum height limits are reduced except at one location (Stelling Gateway) as part of reducing the office allocation. The purpose of the revisions to Alternative C in the Balanced Plan is to more closely achieve a balance among the project objectives (see Section II.A, below). 3 Draft EIR, p. 2-5 (Table 2-1, footnote a). 802 I-3 A. General Plan Amendment Every city and county in California is required to prepare and to adopt a comprehensive, long-term general plan for the physical development of the county or city and, in some cases, land outside the city or county boundaries. Government Code § 65300. The City’s current, 2000-2020 General Plan controls the area and density of commercial, office, hotel, and residential uses built in the city through development allocations in terms of square feet (commercial and office), rooms (hotel), and units (residential). The allocations are geographically assigned in certain neighborhoods, commercial, and employment centers so that private development fulfills both City goals and priorities and reduces adverse impacts to the environment. The City allocates development potential on a project-by-project basis to applicants for net new office and commercial square footage, hotel rooms, and/or residential units. As a result of several recent approvals of projects, a large amount of the current office, commercial and hotel development allocation has been granted, leaving an inadequate pool to allocate to additional development in the city. While the Project is not a complete revision of the City’s 2000-2020 General Plan. The current General Plan contains many goals, policies, standards, and programs that the City and community would like to continue into the future. The Project instead focuses on identifying and analyzing potential changes along the major transportation corridors in Cupertino that have the greatest ability to evolve in the near future because the rest of the city consists primarily of single-family residential neighborhoods. The development allocations in the Balanced Plan are as follows: • Office allocation (reduced to amount in Alternative B): 2,540,231 square feet (net increase of 2,000,000 square feet from the 2000-2020 General Plan)4 • Commercial allocation (same as Alternative C): 1,343,679 square feet (net increase of 0 square feet from the 2000-2020 General Plan)5 4 The Alternative C proposed office allocation is 4,040,231 square feet (net increase from 2000- 2020 General Plan of 3,500,000 square feet). 5 The EIR provided an analysis for the commercial development allocation of 1,343,679 square feet for Alternative C, which is an increase in commercial development allocation of 642,266 square feet over the remaining allocation of 701,413 square feet in the 2020 General Plan; however, the additional 642,266 square footage does not constitute a net increase in commercial development in Cupertino during the planning period of the General Plan Amendment (through 2040). That is because the entire 642,266 square feet of the increased allocation would come from demolition of Vallco Shopping Center and rebuilding and/or relocating that existing commercial square footage to other sites. Due to the high vacancy rate at the Vallco Shopping Mall under existing conditions, however, the EIR conservatively analyzed the total commercial development allocation of 1,343,679 square feet (642,266 existing square feet + 701,413 new square feet). 803 I-4 • Hotel allocation (same as Alternative C): 1,339 rooms (net increase of 1,000 rooms from the 2000-2020 General Plan) • Residential allocation (same as Alternative C): 4,421 units (net increase of 2,526 units from the 2000-2020 General Plan ) As shown above, these development allocations consist of a balance among the development allocations in Alternatives B and C. The recommended heights are lower than those studied in Alternative C, however. In most Special Areas the Balanced Plan would have the same height limits as Alternative B, but in one case (South De Anza Avenue) the height limits would be the same as Alternative A. See Land Use and Community Design Element, Table LU-2. The Balanced Plan provides a better balance of land uses than the Alternative C or any of the other alternatives due to the fact that the office/commercial–to-residential balance is even better than that in Alternative B, which had the lowest VMT of all of the alternatives studied in the EIR. However, it will continue to have significant avoidable impacts for traffic, air quality and noise even after incorporation of all feasible mitigation measures. The majority of the Balanced Plan is located in the City’s Special Areas as identified in the current General Plan. The development allocations can generally be used in Special Areas, Study Areas, Housing Element Sites and Other Special Areas; however, hotel development allocations may not be used in Other Special Areas. The boundaries and proposed changes within each Special Area, Study Area and Other Special Area are described in detail in Section 3.7 (Project Components) of Chapter 3 (Project Description) of the Draft EIR. B. Housing Element Update The Balanced Plan includes a comprehensive update to the City’s Housing Element (the “2014-2022 Housing Element”) in compliance with State law. The Housing Element’s policies and programs are intended to guide the City’s housing efforts through the 2014 to 2022 Housing Element period. The 2014-2022 Housing Element keeps many of the existing policies and strategies in the 2007-2014 Housing Element and revises them to conform to changes in State law or based on a critical evaluation of the programs and policies. The Housing Element assesses housing needs for all income groups and establishes a program to meet these needs. The policies and strategies have also been reorganized to provide for better readability and to eliminate redundancies. State law requires each jurisdiction to address how it will satisfy the quantified objectives for new residential units as represented by the Regional Housing Needs Allocation (RHNA). The RHNA identifies Cupertino’s housing needs by income levels. The City’s housing needs allocation for the period 2014 to 2022 is 1,064 new housing units. The income levels are separated into four categories: very low, low, moderate and above moderate, shown in Draft EIR Table 3-20. Draft EIR, p. 3-66. State law allows jurisdictions 804 I-5 to take credit for residential projects that have been approved, building permits issued during the plan period in which the review is taking place, and second dwelling units (also known as accessory dwelling units) that are anticipated to be constructed during the plan period. The City has issued entitlements and/or building permits for 30 units since January 1, 2014. Additionally, it is anticipated that because 32 second units (on single-family lots) were constructed in the 2007-2014 plan period, 32 second units will be constructed in the current plan period as well. Therefore, the City can take credit for a total of 62 units (30 units approved and 32 second units anticipated). As a result, the City is required to identify sites for the construction of 1,064 minus 62 units, or 1,002 units. To accommodate the current planning period’s RHNA, the Available Land Inventory in the Draft 2014-2022 Housing Element identified 19 potential housing sites, which are analyzed in the EIR. The State Department of Housing and Community Development (HCD) generally requires jurisdictions to show a surplus of sites/units in order to guarantee that the City could realistically accommodate the RHNA allocations. Of the original 19 sites identified in the Draft EIR, 12 remain for consideration.6 Approximately 2,084 units could be accommodated on these 12 sites. Draft EIR, Table 3-21, pp. 3-68 to 3-70 and City Council Staff Report for November 10, 2-14 (Table 3). The maximum number for the residential allocation pursuant to the Balanced Plan is 4,421 units, which allows for net new development of 2,526 units above the current General Plan buildout. HCD generally requires jurisdictions to show a surplus of sites/units in order to guarantee that the RHNA realistically can be accommodated. Based on consultation with HCD and the City’s housing consultant expert, it is anticipated that HCD will require sites to accommodate units equivalent to a moderate surplus above the City’s housing need, or approximately 1,400 units. Of the 12 identified sites, the City Council has directed staff to submit six sites to HCD for review as to their adequacy under State Planning and Zoning Law. These six sites can accommodate 1,386 units. 6 Of the 19 studied in the EIR, only 12 sites are available for selection. That is because the largest property owner associated with the Intrahealth/Valley Church etc. site on Stelling Road, and the owners of two of the three parcels at Cypress Building/Hall property site notified the City that their properties should not be included in the Housing Sites Inventory. The property owner of a small portion of Shan Restaurant/Q-Mart/China Dance indicated that their parcel should not be included in the Housing Sites Inventory, the resulting reduction in size does not result in a significant change in the size of the site and the balance of the site is included as an Alternate Site. While the property owner of 40% of the Arya/Scandinavian Design site indicated that their property should be removed from the Housing Sites Inventory, this site was already recommended for removal in the Balanced Plan. In addition, four other sites were removed from consideration. 805 I-6 The means of achieving the development of these units are provided for in the policies and programs described in the Housing Element. The City's quantified objectives are identified in Table 3.4 of the Housing Element. The City is not obligated to construct the housing units identified by the RHNA. Rather, the City is required to demonstrate adequate capacity for 1,064 housing units by identifying sufficient specific sites in order to satisfy the RHNA under existing zoning and land use policy. In addition to analyzing the 2014-2022 Housing Element for the specified planning period, the Final EIR analyzes the overall environmental effects of increasing housing units on a citywide basis to address, which is necessary the address the two future housing elements that are expected to be adopted during the period between 2014 and General Plan Amendment horizon year of 2040. The Plan Bay Area (the Bay Area Region’s Sustainability Communities Strategy and Regional Transportation Plan) identifies that the City of Cupertino’s housing need by 2040 will be 4,421 units. Therefore, while the Housing Element only identifies the potential for development of 1,064 units on six Available Land Inventory housing sites, the Balanced Plan also adds 2,526 units to the City’s current residential development allocation for a total of 4,421 units, the impacts of which are analyzed in the EIR. C. Conforming General Plan Amendments, Zoning Amendments, and Density Bonus Amendments As part of the Housing Element update process, Chapter 19.56 (Density Bonus) in Title 19 (Zoning) of the City’s Municipal Code will be amended to be consistent with the 2007–2014 Housing Element Program 12 (Density Bonus Program). Chapter 19.20 (Permitted, Conditional and Excluded Uses in Agricultural and Residential Zones), Chapter 19.76 (Public Building (BA), Quasi-Public Building (BQ) and Transportation (T) Zones), and Chapter 19.84 (Permitted, Conditional And Excluded Uses In Open Space, Park And Recreation And Private Recreation Zoning Districts), also in Title 19 (Zoning) of the City’s Municipal Code, will be amended to ensure conformance with SB 2 requirements pertaining to permanent emergency shelters and to comply with the State Employee Housing Act with respect to farmworker housing and employee housing. In addition, Program 17 of the Housing Element, which addresses the potential loss of multi-family housing and displacement of lower- and moderate-income households due to new development, will be amended to comply with recent legislation and to mitigate the potential displacement impacts to renters (e.g. tenant relocation benefits). The Balanced Plan also includes revisions to the General Plan Land Use Map, Zoning Ordinance (including the Chapters listed above and 19.08 (Definitions) and 19.144 (Development Agreements), and the Zoning map to ensure consistency with the General Plan as a result of changes to Housing Element policies or to address changes required as a result of State legislation adopted since the last General Plan update (such as Assembly Bill 806 I-7 1358, Complete Streets), and as a result of bringing non-conforming land uses into conformance with the General Plan and Zoning Ordinance. D. Project Objectives The project objectives are as follows: • Emphasize employment and a mix of economic development opportunities by replenishing, reallocating, and increasing city-wide office, commercial, and hotel, allocations in order to capture: • A share of the regional demand for office and hotel development, and • Retail sales tax leakage in the trade area. • Address local needs and regional requirements for new housing, including affordable housing, in Cupertino by replenishing, re-allocating and increasing city- wide residential allocations to be consistent with 2040 Bay Area Plan projections to allow flexibility for the city when future state-mandated updates are required to the Housing Element. • Update the Housing Element as required by State law. • Creating opportunities for mixed-use development consistent with Regional Sustainable Communities Strategies for greenhouse gas emissions reductions as required by SB 375. • Investing in improvement to adapt to climate change over time. • Consider increased heights in key nodes and gateways, if proposed development provides retail development and benefits directly to the community. • Update General Plan policies to implement multi-modal traffic standards as opposed to LOS thresholds currently identified. Balancing development objectives with transportation constraints and opportunities. • Revitalize the Vallco Shopping District by adopting policies to support its redevelopment, so it becomes a cohesive, vibrant shopping and entertainment destination that serves both the region and the local community. III. ENVIRONMENTAL REVIEW PROCESS A. Environmental Impact Report On March 5, 2014, the City circulated a Notice of Preparation (NOP) of the Draft EIR to the Office of Planning and Research (OPR) State Clearinghouse and interested agencies and 807 I-8 persons. A postcard notice had previously been delivered in February 2014 to all postal addresses in the City to announce upcoming dates for the General Plan and Housing Element projects. The NOP was circulated for comment by responsible and trustee agencies and interested parties for a total of 30 days, from March 5, 2014 through April 7, 2014, during which time the City held a public scoping meeting on March 11, 2014. Comments on the NOP were received by the City and considered during preparation of the Draft EIR. The Draft EIR was made available for review by the public and interested parties, agencies, and organizations for a 45-day comment period starting on June 18, 2014 and ending August 1, 2014. The Draft EIR was distributed to local, regional and State agencies. Copies of the Draft EIR in paper or electronic format were available to interested parties for purchase or review at Cupertino City Hall. The Draft EIR was also available for review at libraries in the City and in surrounding communities, and an electronic version of the Draft EIR and all appendices were posted on a website the City created for the combined General Plan and Housing Element projects at www.cuptertinogpa.org, which included an electronic comment portal to receive public comment 24 hours a day, seven days a week. The City continues to make these documents available on its website for the Project at the following URL: http://www.cupertinogpa.org/app_folders/view/1. The public was also invited to submit written comments on the Draft EIR to the City of Cupertino Community Development Department by mail or e-mail to planning@cupertino.org. Notice of availability of the Draft EIR was made in several ways. The City sent a postcard announcing the availability of the Draft EIR and inviting attendance at the Draft EIR comment meeting to all postal addresses in Cupertino. In addition, in accordance with CEQA, the City posted the Notice of Availability (NOA) on the Project website. The City also sent emails providing notice of the Draft EIR’s availability to all persons who had indicated an interest in the Project and signed up for notifications through the City’s website. The local media publicized the availability of the Draft EIR and the public comment period. The City held a Community Open House and EIR Comment Meeting during the comment period on June 24, 2014. The City solicited written comments at the meeting by distributing comment cards that were collected at the end of the evening. The 45-day comment period on the Draft EIR ended on August 1, 2014 at 4:30 p.m. Agencies, organizations, and members of the public submitted written comments on the Draft EIR. The Responses to Comments Document, which is the third volume of the Final EIR, was issued for public review on August 28, 2014 and sent to public agencies who had commented on the Draft EIR. Chapter 5 of the Responses to Comments Document provides responses to the comments received during the comment period on the Draft EIR. Late comments received after the close of the public comment period have been addressed in memoranda submitted to the City Council. 808 I-9 On September 9, 2014, the Planning Commission held a Study Session on the EIR and took public comments. On October 7, 2014, the City Council held a Study Session on the Final EIR and took public comments. On October 2, 2014, the Environmental Review Committee determined that the EIR was adequate and recommended that the City Council certify the EIR. On October 20, 2014, following a duly noticed public hearing on October 14, 2014 that was continued on October 20, 2014, the City Planning Commission, recommended that the City Council certify the Final EIR. B. Additional Housing Element Public Review Process The Housing Element must identify community involvement and decision-making processes and techniques that constitute affirmative steps for receiving input from all economic segments of the community, especially low-income persons and their representatives, as well as from other members of the community. Public participation, pursuant to Section 65583(c)(8) of the Government Code, was accomplished in a variety of ways. Outreach was conducted in the form of in-person interviews with stakeholders including several housing-related non-profits and organizations that provide services to low income families and individuals in the City; and with parties interested in the Housing Element process, including property owners and community groups such as the Concerned Citizens of Cupertino and neighborhood groups. Below are some examples of outreach and noticing conducted as part of the Housing Element update. • Notice postcard sent to every postal address in the City. • Joint Housing Commission and Planning Commission workshop – January 23, 2014 • Housing Commission Workshop – February 12, 2014 • Open House – February 19, 2014, September 16, 2014 • Study Session held with Planning Commission – February 19, 2014 • Study Session held with City Council – March 3, 2014 • Housing Commission meeting on housing policy – March 19, 2014 • Joint Planning Commission/City meeting on housing policy – April 1, 2014 • Newspaper notices. • Notices sent to all prospective housing element site property owners prior to City Council authorization to commence environmental review. 809 I-10 • Notices sent to all prospective housing element site property owners prior to Planning Commission and City Council prioritization of the sites for HCD review. • Webpage hosted focusing on the Housing Element Update process. • Notice of website additions and Workshop reminders e-mailed to over 300 Housing Element website subscribers. • Staff presentations at the Chamber of Commerce. • Housing Commission Meeting – August 28, 2014 • Planning Commission Hearing – October 14, 2014 and October 20, 2014 The City’s outreach also included stakeholder meetings with non-profit and for-profit housing developers, building industry trade groups, architects, planners, and affordable housing funders. The Housing Element update process in the City has involved a number of groups and individuals in the process of reviewing current housing conditions and needs and considering potential housing strategies. Two public workshops were held at Housing Commission meeting and at a Joint Planning Commission Housing Commission meeting. In addition, one publicly noticed Planning Commission Study Session was held and included opportunity for public comment. Feedback from these study sessions and public workshops was used to identify needs, assess constraints and develop draft programs for the Housing Element update, and are included in Section 1.3 of Appendix A of the General Plan. IV. FINDINGS The findings, recommendations, and statement of overriding considerations set forth below (the “Findings”) are made and adopted by the Cupertino City Council as the City’s findings under CEQA and the State CEQA Guidelines relating to the Project. The Findings provide the written analysis and conclusions of this City Council regarding the Project’s environmental impacts, mitigation measures, alternatives to the Project, and the overriding considerations that support approval of the Project despite any remaining environmental effects it may have. These findings summarize the environmental determinations of the Final EIR with regard to project impacts before and after mitigation, and do not attempt to repeat the full analysis of each environmental impact contained in the Final EIR. Instead, these findings provide a summary description of and basis for each impact conclusion identified in the Final EIR, describe the applicable mitigation measures identified in the Final EIR, and state the City’s findings and rationale about the significance of each impact following the adoption of mitigation measures. A full explanation of these environmental findings and conclusions can be found in the Final EIR, and these findings hereby incorporate by reference the discussion and analysis in the Final EIR supporting the Final EIR’s determinations regarding mitigation measures and the Project’s impacts. 810 I-11 When evaluating cumulative impacts, CEQA allows the use of either a list of past, present, and probable future projects, including projects outside the control of the lead agency, or a summary of projections in an adopted planning document. The cumulative impacts analysis in the Final EIR uses the projections approach and takes into account growth from the Project within the Cupertino city boundary and Sphere of Influence (SOI), in combination with impacts from projected growth in the rest of Santa Clara County and the surrounding region, as forecast by the Association of Bay Area Governments (ABAG). In adopting mitigation measures, below, the City intends to adopt each of the mitigation measures identified in the Final EIR. Accordingly, in the event a mitigation measure identified in the Final EIR has been inadvertently omitted from these findings, such mitigation measure is hereby adopted and incorporated into the Project in the findings below by reference. In addition, in the event the language of a mitigation measure set forth below fails to accurately reflect the mitigation measure in the Final EIR due to a clerical error, the language of the mitigation measure as set forth in the Final EIR shall control unless the language of the mitigation measure has been specifically and expressly modified by these findings. Sections V and VI, below, provide brief descriptions of the impacts that the Final EIR identifies as either significant and unavoidable or less than significant with adopted mitigation. These descriptions also reproduce the full text of the mitigation measures identified in the Final EIR for each significant impact. V. SIGNIFICANT AND UNAVOIDABLE ADVERSE IMPACTS AND DISPOSITION OF RELATED MITIGATION MEASURES RESULTING IN SIGNIFICANT AND UNAVOIDABLE ADVERSE IMPACTS The Final EIR identifies the following significant and unavoidable adverse impacts associated with the approval of the Project, some of which can be reduced, although not to a less-than-significant level, through implementation of mitigation measures identified in the Final EIR. Public Resources Code § 21081(a)(1). In some cases, the City cannot require or control implementation of mitigation measures for certain impacts because they are within the responsibility and jurisdiction of other public agencies. Public Resources Code § 21081(a)(2). Therefore, as explained below, some impacts will remain significant and unavoidable notwithstanding adoption of feasible mitigation measures. To the extent that these mitigation measures will not mitigate or avoid all significant effects on the environment, and because the City cannot require mitigation measures that are within the responsibility and jurisdiction of other public agencies to be adopted or implemented by those agencies, it is hereby determined that any remaining significant and unavoidable adverse impacts are acceptable for the reasons specified in Section XII, below. Public Resources Code § 21081(a)(3). As explained in Section IX, below, the findings in this Section 811 I-12 V are based on the Final EIR, the discussion and analysis in which is hereby incorporated in full by this reference. A. Impact AQ-1: Implementation of the Project would conflict with or obstruct implementation of the applicable air quality plan. The Final EIR finds that while the Project would support the primary goals of the 2010 Bay Area Clean Air Plan, the buildout of the Project would conflict with the BAAQMD Bay Area Clean Air Plan goal for community-wide VMT to increase at a slower rate compared to population and employment growth. The rate of growth in VMT would exceed the rate of population and employment growth, resulting in a substantial increase in regional criteria air pollutant emissions in Cupertino. There are no mitigation measures to reduce this impact to a less-than-significant level. Policies and development standards in the Project would lessen the impact, but due to the level of growth forecast in the city and the programmatic nature of the Project, the impact would be significant and unavoidable. B. Impact AQ-2: Implementation of the Project would violate any air quality standard or contribute substantially to an existing or projected air quality violation. The Final EIR finds that future development under the Project would result in a substantial long-term increase in criteria air pollutants over the 26-year General Plan horizon. Criteria air pollutant emissions would be generated from on-site area sources (e.g., fuel used for landscaping equipment, consumer products), vehicle trips generated by the project, and energy use (e.g., natural gas used for cooking and heating). Because cumulative development within the City of Cupertino could exceed the regional significance thresholds, the Project could contribute to an increase in health effects in the basin until such time as the attainment standards are met in the San Francisco Bay Area Air Basin (SFBAAB). The impact is considered significant and unavoidable. Implementation of Mitigation Measures AQ-2a and AQ-2b, set forth below, which are hereby adopted and incorporated into the Project, would reduce these impacts, but not to a less-than-significant level. Due to the programmatic nature of the Project, no additional mitigation measures are available beyond Mitigation Measures AQ-2a and AQ-2b; therefore, the impact would be significant and unavoidable. Mitigation Measure AQ-2a: As part of the City’s development approval process, the City shall require applicants for future development projects to comply with the current Bay Area Air Quality Management District’s basic control measures for reducing construction emissions of PM10. 812 I-13 Mitigation Measure AQ-2b: As part of the City’s development approval process, the City shall require applicants for future development projects that could generate emissions in excess of the Bay Area Air Quality Management District’s (BAAQMDs) current significance thresholds during construction, as determined by project-level environmental review, when applicable, to implement the current BAAQMD construction mitigation measures (e.g. Table 8-3 of the BAAQMD CEQA Guidelines) or any construction mitigation measures subsequently adopted by the BAAQMD. C. Impact AQ-3: Implementation of the Project would result in a cumulatively considerable net increase of any criteria pollutant for which the Project region is nonattainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors). The Final EIR finds that the Project will combine with regional growth within the air basin to result in a cumulatively considerable net increase of pollutants for the SFBAAB, which is currently designated a nonattainment area for California and National O3, California and National PM2.5, and California PM10 ambient air quality standards (AAQS). Any project that produces a significant regional air quality impact in an area that is in nonattainment adds to the cumulative impact. Mitigation measures AQ-2a and AQ-2b, set forth and incorporated above, would reduce impacts to the extent feasible , but the Project’s impacts would remain significant and unavoidable. There are no mitigation measures to reduce the impact to a less-than-significant level. Air pollutant emissions associated with the Project would result in a cumulatively considerable contribution to air quality impacts, and the Project’s impacts would be significant and unavoidable. D. Impact AQ-6: Implementation of the Project would cumulatively contribute to air quality impacts in the San Francisco Bay Area Air Basin. As described in the discussion of Impact AQ-3, the Final EIR finds that regional air quality impacts will be significant. Implementation of the Project, in combination with past, present, and reasonably foreseeable projects, would result in a significant cumulative impact with respect to air quality even with the applicable regulations, as well as the Mitigation Measures AQ-2a, AQ-2b, AQ-4a and AQ-4b and the General Plan policies outlined in Impact AQ-1 through AQ-5. Therefore, this cumulative impact would be significant and unavoidable. There are no mitigation measures to reduce the impact to a less-than-significant level. Implementation of Mitigation Measures AQ-2a, AQ-2b, AQ-4a and AQ-4b and the General Plan policies outlined in Impact AQ-1 through AQ-5, would lessen the impact, but not to a less-then-significant level. Because the San Francisco Bay Area Air Basin is currently 813 I-14 designated as a nonattainment area for California and National O3, California and National PM2.5, and California PM10 AAQS , the Project’s cumulative impact would be significant and unavoidable. E. Impact NOISE-3: Implementation of the Project would result in a substantial permanent increase in ambient noise levels in the Project vicinity above levels existing without the Project. The Final EIR finds that implementation of the Project would have a significant impact if it results in a substantial permanent increase in ambient noise levels in the project vicinity above levels existing without the Project. The Final EIR anticipates that there would be substantial permanent increases to ambient noise levels throughout Cupertino as a result of implementation of the Project and ongoing regional growth, and that these increases would result primarily from increases in transportation-related noise, especially noise from automobile traffic. Although the Project contains policies that could in certain cases reduce or prevent significant increases in ambient noise at sensitive land uses upon implementation (e.g., noise-reducing technologies, rubberized asphalt, soundwalls, berms, and improved building sound-insulation), the measures described in these policies would not be universally feasible, and some of the most effective noise-attenuation measures, including sound walls and berms, would be infeasible or inappropriate in a majority of locations where sensitive land uses already exist. There are no mitigation measures to reduce the impact to a less-than-significant level. All conceivable mitigations would be either economically impractical, scientifically unachievable, outside the City’s jurisdiction, and/or inconsistent with City planning goals and objectives. Therefore, even after the application of relevant, feasible regulations and General Plan policies, the impact to ambient noise levels would remain significant and unavoidable. F. Impact NOISE-5: Implementation of the Project, in combination with past, present, and reasonably foreseeable projects, would result in significant cumulative impacts with respect to noise. The Final EIR finds that the analysis of the Project, as described in the discussions of Impact NOISE-3, addresses cumulative noise impacts from implementation of the Project. Similarly, the noise contours and traffic-related noise levels developed for the Project include and account for regional travel patterns as they affect traffic levels in the City. Thus, the future noise modeling which served as the foundation for the overall Project analysis was based on future, cumulative conditions, and finds that implementation of the Project would result in significant cumulative impacts. 814 I-15 The Final EIR finds that even after the application of pertinent policies and strategies of the General Plan Amendment cumulative noise impacts of the Project, as described in the discussion of Impact NOISE-3, would remain significant and unavoidable. Thus, implementation of the Project would result in a significant and unavoidable cumulative impact with respect to noise. There are no feasible mitigation measures to reduce the impact to a less-than-significant level. As explained in the discussion of Impact NOISE-3, all conceivable cumulative noise mitigations would be economically impractical, scientifically unachievable, outside the City’s jurisdiction, and/or inconsistent with City planning goals and objectives, and would be infeasible. Therefore, even after the application of relevant, feasible regulations and General Plan policies, the cumulative impact would remain significant and unavoidable. G. Impact TRAF-1: Implementation of the Project would conflict with an applicable plan, ordinance or policy establishing measures of effectiveness for the performance of the circulation system, taking into account all modes of transportation including mass transit and non-motorized travel and relevant components of the circulation system, including but not limited to intersections, streets, highways and freeways, pedestrian and bicycle paths, and mass transit. The Final EIR finds that implementation of the Project would generate additional motor vehicle trips on the local roadway network, resulting in significant impacts to sixteen (16) out of 41 study intersections during at least one of the AM or PM peak hours. See Draft EIR, Table 4.13-13.7 Implementation of Mitigation Measure TRAF-1, set forth below, which is hereby adopted and incorporated into the Project, would secure a funding mechanism for future roadway and infrastructure improvements that are necessary to mitigate impacts from future projects based on then current standards, but not to a less-than-significant level. Impacts would remain significant and unavoidable because the City cannot guarantee improvements at these intersections at this time. This is in part because the nexus study has yet to be prepared and because some of the impacted intersections are within the jurisdiction of the City of Sunnyvale, the City of Santa Clara, and Caltrans. The City will continue to cooperate with these jurisdictions to identify improvements that would reduce or minimize the impacts to intersections and roadways as a result of implementation of future development projects in Cupertino, but, because many of the improvements in Mitigation Measure TRAF- 1 are within the responsibility and jurisdiction of other agencies and not the City of Cupertino, this impact would remain significant and unavoidable. 7 Following completion of the Draft EIR, the impacts to Intersection #29 were determined to be less-than-significant rather than significant. See Supplemental Text Revisions Memo. 815 I-16 Mitigation Measure TRAF-1: The City of Cupertino shall commit to preparing and implementing a Transportation Mitigation Fee Program to guarantee funding for roadway and infrastructure improvements that are necessary to mitigate impacts from future projects based on the then current City standards. As part of the preparation of the Transportation Mitigation Fee Program, the City shall also commit to preparing a "nexus" study that will serve as the basis for requiring development impact fees under AB 1600 legislation, as codified by California Code Government Section 66000 et seq., to support implementation of the Project. The established procedures under AB 1600 require that a "reasonable relationship" or nexus exist between the transportation improvements and facilities required to mitigate the transportation impacts of new development pursuant to the Project. The following examples of transportation improvements and facilities would reduce impacts to acceptable level of service standards and these, among other improvements, could be included in the development impact fees nexus study: ♦ SR 85 Northbound Ramps and Stevens Creek Boulevard (#2): An exclusive left-turn lane for the northbound leg of the intersection (freeway off-ramp) at the intersection of SR 85 and Stevens Creek Boulevard would result in one left-turn lane, one all-movement lane, and one right turn lane. The additional lane could be added within the existing Caltrans right-of-way. ♦ Stelling Road and Stevens Creek Boulevard (#3): The addition of a second exclusive left-turn lane for the eastbound leg of the intersection from Stevens Creek Boulevard to northbound Stelling Road, which could be accomplished by reworking the median. Right turns would share the bike lane. ♦ Sunnyvale-Saratoga Road/De Anza Boulevard and Homestead Road (#5): Widen De Anza Boulevard to four lanes in each direction or the installation of triple left-turn lanes. ♦ De Anza Boulevard and I-280 Northbound Ramp (#6): Restriping of De Anza Boulevard in the southbound direction to provide room for right turn vehicles to be separated from through traffic may be required. The bike lane would be maintained, and right turns would occur from the bike lane. The right turns would continue to be controlled by the signal and would need to yield to pedestrians. ♦ De Anza Boulevard and Stevens Creek Boulevard (#8): Restripe westbound Stevens Creek Boulevard to provide room for right turn vehicles to be separated from through vehicles may be required. The right turn vehicles will share the bike lane and will still be controlled by the traffic signal. Paint a bike box at the front of the lane to provide bikes a place to wait at red lights. The pedestrian crossings will not be affected may enhance the bicycling experience. ♦ De Anza Boulevard and McClellan Road/Pacifica Drive (#9): Realign the intersection that is currently offset resulting in inefficient signal timing such that the McClellan Road and 816 I-17 Pacifica Drive legs are across from each other may be required. In addition, double left turn lanes may be required to be added to De Anza Boulevard with sections of double lanes on McClellan Road and Pacifica Drive to receive the double left turn lanes. These improvements will require the acquisition of right-of-way and demolition of existing commercial buildings. However, some existing right-of-way could be abandoned, which would reduce the net right-of-way take. ♦ Wolfe Road and Homestead Road (#16): The addition of a third southbound through lane to the southbound approach of the intersection of Wolfe Road and Homestead Road may be required, as well as the addition of a southbound exclusive right-turn lane. Three southbound receiving lanes on the south side of the intersection currently exist. An additional westbound through lane for a total of three through-movement lanes, an additional receiving lane on Homestead westbound to receive the additional through lane, as well as the addition of a westbound exclusive right-turn lane may be required. This will require widening Homestead Road. An additional eastbound through lane for a total of three through-movement lanes, an additional receiving lane on Homestead eastbound to receive the additional through lane, as well as the addition of an eastbound exclusive left-turn lane for a total of two left-turn lanes may be required. These improvements will require the acquisition of right-of-way and demolition of parking areas. ♦ Wolfe Road and I-280 Northbound Ramp (#18): The Apple Campus 2 project will be adding a third northbound through lane starting at the northbound on ramp. This third lane will need to be extended farther south to effectively serve the additional northbound traffic due to the General Plan development. This could require widening the Wolfe Road overcrossing. Right-of-way acquisition may be required. In accordance with Caltrans procedures, a Project Study Report (PSR) will need to be prepared. The PSR will look at all interchange improvement options, which may include widening the overcrossing and may also include a redesign of the interchange to go from a partial cloverleaf design to a diamond design. This could help with heavy volumes in the right lane, which contributes to the level-of-service deficiency. ♦ Wolfe Road and I-280 Southbound Ramp (#19): An additional through lane for a total of three through-movement lanes for the northbound leg of the intersection at the Wolfe Road and I- 280 Southbound Ramp may be required. This additional northbound through lane would require widening to the freeway overcrossing. In addition to widening the overcrossing, the City may wish to pursue a redesign of the interchange to go from a partial cloverleaf design to a diamond design. This could help with the problem of heavy volume in the right lane, which contributes to the level of service deficiency. ♦ Wolfe Road/Miller Avenue and Stevens Creek Boulevard (#21): The restriping of the westbound leg of the intersection to provide room so that right turn vehicles can be separated from through vehicles may be required. Right turn vehicles would share the bike lane. Right turn vehicles would still be controlled by the signal, and pedestrian crossings would not be affected. Paint a bike box at the front of the lane to provide bikes a place to wait at red lights may enhance the bicycling experience. 817 I-18 ♦ North Tantau Avenue/Quail Avenue and Homestead Road (#24): Restriping of the southbound leg of the intersection (Quail Avenue) to provide a separate left turn lane may be required. This will require the removal of on-street parking near the intersection. The level-of- service calculations show that with implementation of these improvements, the intersection would operate at an acceptable LOS D. ♦ Tantau Avenue and Stevens Creek Boulevard (#27): The addition of a separate left-turn lane to northbound Tantau Avenue may be required. Right-of-way acquisition and demolition of existing commercial buildings would be required. ♦ Stevens Creek Boulevard and Agilent Technologies Driveway (#30): The restriping of the westbound leg of the intersection to provide room so that right turn vehicles can be separated from through vehicles may be required. Right turn vehicles would share the bike lane. Right turn vehicles would still be controlled by the signal, and pedestrian crossings would not be affected. Paint a bike box at the front of the lane to provide bikes a place to wait at red lights may enhance the bicycling experience. ♦ Lawrence Expressway Southbound Ramp and Stevens Creek Boulevard (CMP, County)(#31): The addition of a second right-turn lane for the southbound leg of the intersection at the Lawrence Expressway Southbound Ramp and Stevens Creek Boulevard may be required. Both lanes would need to be controlled by the signal, and disallow right turns on red. Right-of- way acquisition may be required. ♦ Lawrence Expressway Northbound Ramp and Stevens Creek Boulevard (CMP, County) (#32): Redesign of the northbound leg of the intersection at the Lawrence Expressway Northbound Ramp and Stevens Creek Boulevard to provide one through-movement lane, and one exclusive right-turn lane may be required. Right-of-way acquisition would be required. The fees shall be assessed when there is new construction, an increase in square footage in an existing building, or the conversion of existing square footage to a more intensive use. The fees collected shall be applied toward circulation improvements and right-of-way acquisition. The fees shall be calculated by multiplying the proposed square footage, dwelling unit, or hotel room by the appropriate rate. Traffic mitigation fees shall be included with any other applicable fees payable at the time the building permit is issued. The City shall use the traffic mitigation fees to fund construction (or to recoup fees advanced to fund construction) of the transportation improvements identified above, among other things that at the time of potential future development may be warranted to mitigate traffic impacts. H. Impact TRAF 2: Implementation of the Project would conflict with an applicable congestion management program, including, but not limited to, level of service standards and travel demand measures, or other standards established by the county congestion management agency for designated roads or highways. 818 I-19 The Final EIR finds that of the 41 intersections studied in the EIR traffic analysis, 21 are included in Santa Clara County’s Congestion Management Program (CMP). See Table 4.3- 13, Draft EIR. The Project would result in significant impacts to 11 CMP intersections during at least one of the peak hours. Implementation of Mitigation Measure TRAF-1, set forth and incorporated above, would reduce these impacts, but not to a less-than-significant level. Mitigation Measure: Implement Mitigation Measure TRAF-1. As described in the discussion of Impact TRAF-1, because many of the improvements in Mitigation Measure TRAF-1 are within the responsibility and jurisdiction of other agencies and not the City of Cupertino, these impacts would remain significant and unavoidable. I. Impact TRAF-6: Implementation of the Project, in combination with past, present, and reasonably foreseeable projects, would result in additional cumulatively considerable impacts. The Final EIR finds that the analysis of the Project, as described in the discussions of Impact TRAF-1 and Impact TRAF-2, addresses cumulative impacts to the transportation network in the city and its surroundings; accordingly, cumulative impacts would be the same as Project-specific impacts. Therefore, the cumulative impacts to the City’s transportation network resulting from the Project would be significant and unavoidable. Mitigation Measure: Implement Mitigation Measure TRAF-1. As discussed under TRAF-1, because many of the improvements in Mitigation Measure TRAF-1 are within the responsibility and jurisdiction of other agencies and not the City of Cupertino, this cumulative impact would remain significant and unavoidable. VI. SIGNIFICANT ADVERSE IMPACTS IDENTIFIED IN THE FINAL EIR THAT ARE REDUCED TO A LESS-THAN-SIGNIFICANT LEVEL BY MITIGATION MEASURES ADOPTED AND INCORPORATED INOT THE PROJECT The Final EIR identifies the following significant impacts associated with the Project. It is hereby determined that the impacts addressed by these mitigation measures will be mitigated to a less than significant level or avoided by adopting and incorporating these mitigation measures conditions into the Project. Public Resources Code § 21081(a)(1). As explained in Section IX, below, the findings in this Section VI are based on the Final EIR, the discussion and analysis in which is hereby incorporated in full by this reference. 819 I-20 A. Impact AQ-4: Implementation of the Project would expose sensitive receptors to substantial concentrations of air pollution. The Final EIR finds that the Project could result in locating sensitive receptors in proximity to major sources of air pollution or the siting of new sources of air pollution in proximity to sensitive receptors in the city. Nonresidential land uses that generate truck trips may generate substantial quantities of air pollutants within 1,000 feet of off-site sensitive receptors. In addition, proposed sensitive land uses in Cupertino may be within 1,000 feet of major sources of air pollutants, which would create a significant and unavoidable impact. Implementation of the Mitigation Measures AQ-4a and AQ-4b, set forth below, which are hereby adopted and incorporated into the Project, would reduce this impact to a less-than- significant level. Mitigation Measure AQ-4a: Applicants for future non-residential land uses within the city that: 1) have the potential to generate 100 or more diesel truck trips per day or have 40 or more trucks with operating diesel-powered Transport Refrigeration Units (TRUs), and 2) are within 1,000 feet of a sensitive land use (e.g. residential, schools, hospitals, nursing homes), as measured from the property line of the Project to the property line of the nearest sensitive use, shall submit a health risk assessment (HRA) to the City of Cupertino prior to future discretionary Project approval. The HRA shall be prepared in accordance with policies and procedures of the State Office of Environmental Health Hazard Assessment and the Bay Area Air Quality Management District. If the HRA shows that the incremental cancer risk exceeds ten in one million (10E-06), PM2.5 concentrations exceed 0.3 µg/m3, or the appropriate noncancer hazard index exceeds 1.0, the applicant will be required to identify and demonstrate that Best Available Control Technologies for Toxics (T-BACTs) are capable of reducing potential cancer and noncancer risks to an acceptable level, including appropriate enforcement mechanisms. T-BACTs may include but are not limited to: • Restricting idling on-site. • Electrifying warehousing docks. • Requiring use of newer equipment and/or vehicles. • Restricting offsite truck travel through the creation of truck routes. T-BACTs identified in the HRA shall be identified as mitigation measures in the environmental document and/or incorporated into the site development plan as a component of the Project. Mitigation Measure AQ-4b: Applicants for residential and other sensitive land use projects (e.g. hospitals, nursing homes, day care centers) in Cupertino within 1,000 feet of a major sources of TACs (e.g. warehouses, industrial areas, freeways, and roadways with traffic volumes over 10,000 vehicle per day), as measured from 820 I-21 the property line of the project to the property line of the source/edge of the nearest travel lane, shall submit a health risk assessment (HRA) to the City of Cupertino prior to future discretionary Project approval. The HRA shall be prepared in accordance with policies and procedures of the State Office of Environmental Health Hazard Assessment (OEHHA) and the Bay Area Air Quality Management District. The latest OEHHA guidelines shall be used for the analysis, including age sensitivity factors, breathing rates, and body weights appropriate for children age 0 to 16 years. If the HRA shows that the incremental cancer risk exceeds ten in one million (10E-06), PM2.5 concentrations exceed 0.3 µg/m3, or the appropriate noncancer hazard index exceeds 1.0, the applicant will be required to identify and demonstrate that mitigation measures are capable of reducing potential cancer and non-cancer risks to an acceptable level (i.e. below ten in one million or a hazard index of 1.0), including appropriate enforcement mechanisms. Measures to reduce risk may include but are not limited to: • Air intakes located away from high volume roadways and/or truck loading zones. • Heating, ventilation, and air conditioning systems of the buildings provided with appropriately sized Maximum Efficiency Rating Value (MERV) filters. Mitigation measures identified in the HRA shall be identified as mitigation measures in the environmental document and/or incorporated into the site development plan as a component of the Project. The air intake design and MERV filter requirements shall be noted and/or reflected on all building plans submitted to the City and shall be verified by the City’s Planning Division. B. Impact BIO-1: Implementation of the Project would have a substantial adverse effect, either directly or through habitat modifications, on a plant or animal population, or essential habitat, defined as a candidate, sensitive or special-status species. The Final EIR finds that some special-status bird species such as Cooper’s hawk and white- tailed kite could utilize the remaining riparian corridors and heavily wooded areas for nesting, dispersal and other functions when they pass through urbanized areas. More common birds protected under MBTA may nest in trees and other landscaping on the Project Component locations. Given the remote potential for occurrence of nesting birds at one or more of the Project Component locations and possibility that nests could be inadvertently destroyed or nests abandoned as a result of construction activities, this would be considered a potentially significant impact. Implementation of Mitigation Measure BIO-1, set forth below, which is hereby adopted and incorporated into the Project, would avoid or reduce this impact to a less-than-significant level. 821 I-22 Mitigation Measure BIO-1: Nests of raptors and other birds shall be protected when in active use, as required by the federal Migratory Bird Treaty Act and the California Department of Fish and Game Code. If construction activities and any required tree removal occur during the breeding season (February 1 and August 31), a qualified biologist shall be required to conduct surveys prior to tree removal or construction activities. Preconstruction surveys are not required for tree removal or construction activities outside the nesting period. If construction would occur during the nesting season (February 1 to August 31), preconstruction surveys shall be conducted no more than 14 days prior to the start of tree removal or construction. Preconstruction surveys shall be repeated at 14-day intervals until construction has been initiated in the area after which surveys can be stopped. Locations of active nests containing viable eggs or young birds shall be documented and protective measures implemented under the direction of the qualified biologist until the nests no longer contain eggs or young birds. Protective measures shall include establishment of clearly delineated exclusion zones (i.e. demarcated by identifiable fencing, such as orange construction fencing or equivalent) around each nest location as determined by a qualified biologist, taking into account the species of birds nesting, their tolerance for disturbance and proximity to existing development. In general, exclusion zones shall be a minimum of 300 feet for raptors and 75 feet for passerines and other birds. The active nest within an exclusion zone shall be monitored on a weekly basis throughout the nesting season to identify signs of disturbance and confirm nesting status. The radius of an exclusion zone may be increased by the qualified biologist if project activities are determined to be adversely affecting the nesting birds. Exclusion zones may be reduced by the qualified biologist only in consultation with California Department of Fish and Wildlife. The protection measures shall remain in effect until the young have left the nest and are foraging independently or the nest is no longer active. C. Impact BIO-6: Implementation of the Project, in combination with past, present, and reasonably foreseeable projects, would result in significant cumulative impacts with respect to biological resources. The Final EIR finds that implementation of the Project could result in further conversion of existing natural habitats to urban and suburban conditions, limiting the existing habitat values of the surrounding area and potentially resulting in significant cumulative impacts with respect to biological resources. With implementation of Mitigation Measure BIO-1, set forth and incorporated above, the Project would not make a cumulatively considerable contribution to this cumulative impact, and the impact would be less than significant. Mitigation Measure: Implement Mitigation Measure BIO-1. D. Impact HAZ-4: Implementation of the Project would be located on a site which is included on a list of hazardous materials sites compiled pursuant 822 I-23 to Government Code Section 65962.5 and, as a result, create a significant hazard to the public or the environment. The Final EIR finds that because hazardous materials are known to be present in soil, soil gas, and/or groundwater due to past land uses at certain sites that may be redeveloped as part of the Project, the direct contact, inhalation, or ingestion of hazardous materials could potentially cause adverse health effects to construction workers and future site users. The severity of health effects would depend on the contaminant(s), concentration, use of personal protective equipment during construction, and duration of exposure. The disturbance and release of hazardous materials during earthwork activities, if present, could pose a hazard to construction workers, nearby receptors, and the environment and impacts could be potentially significant. Implementation of Mitigation Measures HAZ-4a and HAZ-4b, set forth below, which are hereby adopted and incorporated into the Project, would avoid or reduce this impact to a less-than-significant level. Mitigation Measure HAZ-4a: Construction at the sites with known contamination shall be conducted under a project-specific Environmental Site Management Plan (ESMP) that is prepared in consultation with the Regional Water Quality Control Board (RWQCB) or the Department of Toxic Substances Control (DTSC), as appropriate. The purpose of the ESMP is to protect construction workers, the general public, the environment, and future site occupants from subsurface hazardous materials previously identified at the site and to address the possibility of encountering unknown contamination or hazards in the subsurface. The ESMP shall summarize soil and groundwater analytical data collected on the project site during past investigations; identify management options for excavated soil and groundwater, if contaminated media are encountered during deep excavations; and identify monitoring, irrigation, or other wells requiring proper abandonment in compliance with local, State, and federal laws, policies, and regulations. The ESMP shall include measures for identifying, testing, and managing soil and groundwater suspected of or known to contain hazardous materials. The ESMP shall: 1) provide procedures for evaluating, handling, storing, testing, and disposing of soil and groundwater during project excavation and dewatering activities, respectively; 2) describe required worker health and safety provisions for all workers potentially exposed to hazardous materials in accordance with State and federal worker safety regulations; and 3) designate personnel responsible for implementation of the ESMP. Mitigation Measure HAZ-4b: For those sites with potential residual contamination in soil, gas, or groundwater that are planned for redevelopment with an overlying occupied building, a vapor intrusion assessment shall be performed 823 I-24 by a licensed environmental professional. If the results of the vapor intrusion assessment indicate the potential for significant vapor intrusion into an occupied building, project design shall include vapor controls or source removal, as appropriate, in accordance with regulatory agency requirements. Soil vapor mitigations or controls could include vapor barriers, passive venting, and/or active venting. The vapor intrusion assessment and associated vapor controls or source removal can be incorporated into the ESMP (Mitigation Measure HAZ-4a). E. Impact HAZ-7: Implementation of the Project, in combination with past, present, and reasonably foreseeable projects, would result in less than significant cumulative impacts with respect to hazards and hazardous materials. The Final EIR takes into account growth projected by the Project within the Cupertino city boundary and Sphere of Influence (SOI), in combination with impacts from projected growth in the rest of Santa Clara County and the surrounding region, as forecast by the Association of Bay Area of Governments (ABAG). Potential cumulative hazardous materials impacts could arise from a combination of the development of the Project together with the regional growth in the immediate vicinity of the Project Study Area. As discussed under Impact HAZ-4, disturbance and release of hazardous materials during earthwork activities, if present, could pose a hazard to construction workers, nearby receptors, and the environment and impacts could be potentially significant. With implementation of Mitigation Measures HAZ-4a and HAZ-4b, set forth and incorporated above, in conjunction with compliance with General Plan policies and strategies, other local, regional, State, and federal regulations, the Project would not make a cumulatively considerable contribution to this cumulative impact, and the impact would be less than significant. Mitigation Measure: Implement Mitigation Measures HAZ-4a and HAZ-4b. F. Impact UTIL-6: Implementation of the Project would result in a determination by the wastewater treatment provider, which serves, or may serve the project, that it does not have adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments. Buildout of the Project would have a significant impact if future projected demand exceeds the wastewater service capacity of the San Jose/Santa Clara Water Pollution Control Plan (SJ/SCWPCP) or the Sunnyvale Water Pollution Control Plan (SWPCP), or the Cupertino Sanitary District (CSD) or City of Sunnyvale collection systems. 824 I-25 Implementation of Mitigation Measures UTIL-6a, UTIL-6b, and UTIL-6c, set forth below, which are hereby adopted and incorporated into the Project, would avoid or reduce this impact to a less-than-significant level. Mitigation Measure UTIL-6a: The City shall work with the Cupertino Sanitary District to increase the available citywide treatment and transmission capacity to 8.65 million gallons per day, or to a lesser threshold if studies justifying reduced wastewater generation rates are approved by CSD as described in Mitigation Measure UTIL- 6c. Mitigation Measure UTIL-6b: The City shall work to establish a system in which a development monitoring and tracking system to tabulate cumulative increases in projected wastewater generation from approved projects for comparison to the Cupertino Sanitary District’s treatment capacity threshold with San Jose/Santa Clara Water Pollution Control Plant is prepared and implemented. If it is anticipated that with approval of a development project the actual system discharge would exceed the contractual treatment threshold, no building permits for such project shall be issued prior to increasing the available citywide contractual treatment and transmission capacity as described in Mitigation Measure UTIL- 6a. Mitigation Measure UTIL-6c: The City shall work with the Cupertino Sanitary District to prepare a study to determine a more current estimate of the wastewater generation rates that reflect the actual development to be constructed as part of Project implementation. The study could include determining how the green/LEED certified buildings in the City reduce wastewater demands. G. Impact UTIL-7: Implementation of the Project, in combination with past, present, and reasonably foreseeable projects, would not result in significant cumulative impacts with respect to wastewater treatment. The Final EIR finds that buildout of the Project would generate a minor increase in the volume of wastewater delivered for treatment at SJ/SCWPCP and SWPCP, representing less than 1 percent of the available treatment capacity at the SJ/SCWPCP and SWPCP, and it would occur incrementally over a period of 26 years. Based on the recent trends of diminishing wastewater treatment demand and the projected population growth in the service areas, cumulative wastewater treatment demand over the Project buildout period is far below the excess capacity of the SJ/SCWPCP and SWPCP. Because the cumulative demand would not substantially impact the existing or planned capacity of the wastewater treatment systems, which have sufficient capacity for wastewater that would be produced 825 I-26 by the Project, the construction of new wastewater treatment facilities would not be necessary. With implementation of Mitigation Measured UTIL-6a, UTIL-6b and UTIL-6c, set forth and incorporated above, cumulative development combined with the Project would not exceed wastewater treatment requirements. Therefore, the Project would not make a cumulatively considerable contribution to this cumulative impact, and the impact would be less than significant. Mitigation Measure: Implement Mitigation Measures UTIL-6a, UTIL-6b, and UTIL-6c. H. Impact UTIL-8: The Project would not be served by a landfill(s) with sufficient permitted capacity to accommodate the Project’s solid waste disposal needs. The Final EIR finds that anticipated rates of solid waste disposal would have a less-than- significant impact with regard to target disposal rates, and that the City would continue its current recycling ordinances and zero-waste policies. Nevertheless, the 2023 termination of the agreement between the Newby Island Landfill facility, as well as that facility’s estimated closure date in 2025, would result in insufficient solid waste disposal capacity at buildout of the Project, resulting in a significant impact. Implementation of Mitigation Measure UTIL-8, set forth below, which is hereby adopted and incorporated into the Project, would avoid or reduce this impacts to a less-than- significant level. Mitigation Measure UTIL-8: The City shall continue its current recycling ordinances and zero-waste policies in an effort to further increase its diversion rate and lower its per capita disposal rate. In addition, the City shall monitor solid waste generation volumes in relation to capacities at receiving landfill sites to ensure that sufficient capacity exists to accommodate future growth. The City shall seek new landfill sites to replace the Altamont and Newby Island landfills, at such time that these landfills are closed. I. Impact UTIL-10: Implementation of the Project, in combination with past, present and reasonably foreseeable projects, would result in significant cumulative impacts with respect to solid waste. The Final EIR finds that buildout of the Project will increase the quantity of solid waste for disposal. AB 939 established a goal for all California cities to provide at least 15 years of ongoing landfill capacity; however, growth from other cities in the region may exceed the growth that was taken into account when determining landfill capacity. Also, because the 826 I-27 Newby Island Landfill facility, which currently takes approximately 92 percent of the City's solid waste, is expected to close in 2025, Cupertino may eventually experience insufficient landfill capacity to accommodate existing or increased population and employment levels. Although implementation of existing waste reduction programs and diversion requirements would reduce the potential for exceeding existing capacities of landfills, the potential lack of landfill capacity for disposal of solid waste would be a significant cumulative impact. With implementation of Mitigation Measure UTIL-8, set forth and incorporated above, the Project would not make a cumulatively considerable contribution to this cumulative impact, and the impact would be less than significant. Mitigation Measure Implement Mitigation Measure UTIL-8. VII. GROWTH INDUCING IMPACTS An EIR is required to discuss growth inducing impacts, which consist of the ways in which the project could foster economic or population growth, or the construction of additional housing, either directly or indirectly, in the surrounding environment. State CEQA Guidelines § 15126.2(d); Public Resources Code § 21100(b)(5). Direct growth inducement would result, for example, if a project involves the construction of substantial new housing that would support increased population in a community or establishes substantial new permanent employment opportunities. This additional population could, in turn, increase demands for public utilities, public services, roads, and other infrastructure. Indirect growth inducement would result if a project stimulates economic activity that requires physical development or removes an obstacle to growth and development (e.g., increasing infrastructure capacity that would enable new or additional development). It must not be assumed that growth in any area is necessarily beneficial, detrimental, or of little significance to the environment. State CEQA Guidelines § 15126.2(d). Section 6.3 of the Draft EIR analyzes the growth inducing impacts of the Project. As explained in Section IX, below, the findings in this Section VII are based on the Final EIR, the discussion and analysis in which is hereby incorporated in full by this reference. Implementation of the Project would directly induce population, employment and economic growth by replenishing the commercial, residential, hotel, and office space allocation within some areas of the city. The Project would result in the following growth patterns based on the expected growth assumptions for the city boundary: 827 I-28 • Implementation of the Project to the year 2040 would result in increased office space development allocation of approximately 2,540,231 square feet. This would result in a total anticipated office space of approximately 11,470,005 square feet by 2040.8 • Implementation of the Project to the year 2040 would result in a commercial space development allocation of approximately 1,343,679 square feet, which is an increase of 642,266 square feet in the allocation pool but a net increase of 0 square feet. That is because all 642,266 square feet of increase allocation would come from demolition and rebuilding of existing commercial square footage (see footnote 5, above). This would result in a total anticipated commercial space of approximately 4,430,982 square feet by 2040.9 • Implementation of the Project to the year 2040 would result in increased hotel room development allocation of approximately 1,339 rooms. This would result in a total anticipated hotel room inventory of approximately 2,429 rooms by 2040.10 • Implementation of the Project to the year 2040 would result in increased residential unit development allocation of approximately 4,421 units. This would result in a total anticipated residential unit inventory of approximately 25,820 residential units by 2040.11 State law requires the City to promote the production of housing to meet its Regional Housing Needs Allocation made by ABAG. The housing and commercial/ industrial growth in Cupertino would allow the City to address its regional fair-share housing obligations. The Project is considered growth inducing because it encourages new growth in the urbanized areas of Cupertino. Development in these areas would consist of infill development on underutilized sites, sites that have been previously developed, and sites that are vacant and have been determined to be suitable for development. However, because infrastructure is largely in place and commercial or office growth would be required to comply with the City’s General Plan, Zoning regulations and standards for public services and utilities; secondary or indirect effects associated with this growth do not represent a new significant environmental impact which has not already been addressed in the individual resource chapters of this EIR. 8 Existing built/approved office space was 8,929,774 square feet in 2013. 9 Existing built/approved commercial space was 3,729,569 square feet in 2013. 10 Existing built/approved hotel rooms are 1,116 rooms. With the remaining commercial allocation, commercial buildout by 2040 is estimated to be 4,430,982 square feet. Cupertino Community Development Department (October 31, 2014). 11 Existing built/approved residential units was 21,412 units in 2014. 828 I-29 VIII. ALTERNATIVES The Final EIR analyzed four alternatives, examining the environmental impacts and feasibility of each alternative, as well as the ability of the alternatives to meet project objectives. The project objectives are listed in Chapter 3 (Project Description) of the Draft EIR; the potentially significant environmental effects of the Project, including feasible mitigation measures identified to avoid these impacts, are analyzed in Chapter 4 (Environmental Evaluation) of the Draft EIR; and the alternatives are described in detail in Chapter 5 (Alternatives to the Proposed Project) of the Draft EIR. Brief summaries of the alternatives are provided below. A brief discussion of the Environmentally Superior Alternative follows the summaries of the alternatives. As explained in Section IX, below, the findings in this Section VII are based on the Final EIR, the discussion and analysis in which is hereby incorporated in full by this reference. A. The No Project Alternative CEQA requires evaluation of the “no project” alternative. State CEQA Guidelines § 15126.6(e). Consistent with State CEQA Guidelines section 15126.6(e)(3)(A), the No Project Alternative assumes that growth and development would continue to occur under the provisions of the current 2000-2020 General Plan, including the development allocations for office and commercial space, and hotel and residential unit allocations. Thus, no new development potential beyond what is currently permitted in the 2000-2020 General Plan would occur. As shown in Draft EIR Table 5-1, the No Project Alternative would allow for the following new development allocations: • Office allocation: 540,231 square feet (no net increase from 2000-2020 General Plan) • Commercial allocation: 701,413 square feet (no net increase from 2000-2020 General Plan) • Hotel allocation: 339 rooms (no net increase from 2000-2020 General Plan) • Residential allocation: 1,895 units (no net increase from 2000-2020 General Plan) As discussed in Section 5.1.7 of the Draft EIR, the No Project Alternative would not achieve any of the City’s project objectives, which are as follows, except that it would provide for the RHNA for the 20014-2022 planning period: • Emphasize employment and a mix of economic development opportunities by replenishing, reallocating, and increasing city-wide office, commercial, and hotel, allocations in order to capture: 829 I-30 • A share of the regional demand for office and hotel development, and • Retail sales tax leakage in the trade area. • Address local needs and regional requirements for new housing, including affordable housing, in Cupertino by replenishing, re-allocating and increasing city- wide residential allocations to be consistent with 2040 Bay Area Plan projections to allow flexibility for the city when future state-mandated updates are required to the Housing Element. • Update the Housing Element as required by State law. • Creating opportunities for mixed-use development consistent with Regional Sustainable Communities Strategies for greenhouse gas emissions reductions as required by SB 375. • Investing in improvement to adapt to climate change over time. • Consider increased heights in key nodes and gateways, if proposed development provides retail development and benefits directly to the community. • Update General Plan policies to implement multi-modal traffic standards as opposed to LOS thresholds currently identified. Balancing development objectives with transportation constraints and opportunities. • Revitalize the Vallco Shopping District by adopting policies to support its redevelopment, so it becomes a cohesive, vibrant shopping and entertainment destination that serves both the region and the local community. For the foregoing reasons, the No Project Alternative is hereby rejected as infeasible. B. Land Use Alternative A Land Use Alternative A identifies how growth would occur if the City largely continues the policies of the current 2005 General Plan, while making minor development allocation and boundary changes. The 2005 General Plan land use standards would continue to apply to Vallco Shopping Mall, and it would not be redeveloped in any substantial manner. Alternative A would increase city-wide office and hotel allocation but would not increase allocations for commercial and residential uses. No maximum height increases are proposed under this alternative. As shown in Draft EIR Table 5-1, the Land Use Alternative A would allow for the following new development allocations: 830 I-31 • Office allocation: 1,040,231 square feet (net increase of 500,000 square feet from the 2000-2020 General Plan) • Commercial allocation: 701,413 square feet (no net increase from the 2000-2020 General Plan) • Hotel allocation: 600 rooms (net increase of 261 rooms from the 2000-2020 General Plan) • Residential: 1,895 units (no net increase from the 2000-2020 General Plan) As discussed in Section 5.2.8 of the Draft EIR, Alternative A would not achieve the project objectives concerning local needs and regional requirements for new housing, including affordable housing, in Cupertino, because it would not provide sufficient residential units to meet the City’s Regional Housing Needs Allocation (RHNA) of 1,064 units. In order to fully comply with the RHNA, the City would need to provide a moderate surplus in addition to the RHNA or approximately 1,400 units. Alternative A only allows for a surplus of only eight units, however. Alternative A also would not increase the allocation of residential units to accommodate Plan Bay Area projections for residential growth by 2040 (4,421 units). Alternative A fails to meet project objectives with regard to reallocating, replenishing and increasing city-wide office, commercial and hotel allocations for purposes of economic development, because Alternative A does not allow for any commercial growth beyond that allocated under the 2000-2020 General Plan and allows in insufficient amount of office and hotel growth. Further, Alternative A does not meet the project objective to consider increased heights in key Nodes and Gateways, because no maximum height increases are proposed under this alternative. Alternative A also does not meet the City’s objective of creating mixed use development consistent with Plan Bay Area and SB 375, because it would not concentrate development in major transportation corridors to the same degree as Alternatives B and C and the Balanced Plan. Alternative A does not envision a complete redevelopment for Vallco Shopping District that would involve adding office and residential uses as in Alternatives B and C. This would not completely meet the project objective to revitalize the Shopping District so it becomes a cohesive, vibrant shopping and entertainment destination that serves both the region and the local community. For the foregoing reasons, Land Use Alternative A is hereby rejected as infeasible. C. Land Use Alternative B Land Use Alternative B identifies how the City can focus development along major mixed- use corridors in order to create more complete commercial, office and entertainment areas, and to address mid-term housing needs. It would increase development allocations for 831 I-32 office, commercial and hotel land uses in order to better capture retail sales leakage and regional demand for office development. Alternative B also envisions the transformation of the Vallco Shopping Mall into a retail, employment, housing and entertainment destination, but possibly at a slightly smaller scale than under Alternative C. Although the zoning and land use designations are the same in the Alternative B and Alternative C, the Foothill Market and Bateh Housing Element sites were not studied as part of Alternative B. Alternative B would allow for revised density and height standards at key Gateways and Nodes within Special Areas along major transportation corridors that are different from Alternative C. Alternative B also would increase residential allocations to the amount necessary to meet the City’s RHNA of 1,064 units plus a moderate surplus, or approximately 1,400 units, but would increase the allocation of residential units to accommodate only 75 percent of Plan Bay Area projections for residential growth by 2040. As shown in Draft EIR Table 5-1 and the Supplemental Text Revisions, the Land Use Alternative B would allow for the following new development allocations: • Office allocation: 2,540,231 square feet (net increase of 2,000,000 square feet from the 2000-2020 General Plan) • Commercial allocation: 1,343,679 square feet (net increase of 0 square feet from the 2000-2020 General Plan)12 • Hotel allocation: 839 rooms (net increase of 500 rooms from the 2000-2020 General Plan) • Residential: 3,316 units (net increase of 1,421 units from the 2000-2020 General Plan) While Alternative B meets all of the project objectives, in comparison with the Balanced Plan, described in Section II.A, above, the commercial, hotel, and residential allocations under Alternative B would not strike the optimal balance in attempting to achieve the City’s economic development objectives. Furthermore, as described in Section 5.3.8 of the Draft EIR, Alternative B would not go as far as Alternative C in meeting project objectives with regard to reallocating, replenishing and increasing city-wide commercial and hotel allocations for purposes of economic development, and replenishment of the residential allocation because it would add less office square footage and fewer hotel rooms, thereby failing to capture as much regional demand for office and hotel uses and failing to capture as much retail sales tax leakage. Similar to the Balanced Plan, Alternative B envisions that the Vallco Shopping District will be completely redeveloped. Alternative B allows for 500 fewer hotel rooms and 1,105 fewer residential units than the Balanced Plan, however. The City commissioned a Market Study 13 which indicates that the City has a strong market for office, hotel room and residential development. An allocation of only 500 hotel rooms 12 See footnote 5, above. 832 I-33 and only 75 percent of the Plan Bay Area projection for residential development by 2040 would not achieve the City’s goal of capturing a share of the regional demand for hotel development or meeting the City’s goals of providing fewer affordable housing options. For the foregoing reasons, Land Use Alternative B is hereby rejected as infeasible. D. Land Use Alternative C Land Use Alternative C identifies a way to transform the Vallco Shopping Mall into a locally and regionally significant retail, employment, housing and entertainment destination, and account for a large portion of the City’s RHNA. Similar to the Balanced Plan, Alternative B envisions that the Vallco Shopping District will be completely redeveloped. In addition, under Alternative C, the Vallco area would become the “downtown” of Cupertino, serving the mixed-use hub for residents, workers and the larger region. Alternative C would increase development allocations to levels higher than those that would be allowed under either Land Use Alternative A or Land Use Alternative B in order to fully capture retail sales leakage and regional demand for office and hotel development. Alternative C would allow for revised height standards at key Gateways and Nodes within Special Areas along major transportation corridors at heights greater than those allowed under Alternative B. The increases in heights and densities in key Nodes, Gateways and Sub-areas are consistent with the City’s goals of concentrating development along the five mixed-use corridors. Alternative C also would increase residential allocations to the amount necessary to meet the City’s RHNA of 1,064 units plus a moderate surplus, or approximately 1,400 units, and would increase the allocation of residential units to accommodate 100 percent of Plan Bay Area projections for residential growth by 2040. As shown in Draft EIR Table 5-1 and the Supplemental Text Revisions, the Land Use Alternative C (the “proposed Project” in the EIR) would allow for the following new development allocations: • Office allocations: 4,040,231 square feet (net increase of 3,500,000 square feet from the 2000-2020 General Plan) • Commercial allocation: 1,343,679 square feet (net increase of 0 square feet from the 2000-2020 General Plan)14 • Hotel allocation: 1,339 rooms (net increase of 1,000 rooms from the 2000-2020 General Plan) 13 BAE Urban Economics, General Plan Amendment Market Study (February 13, 2014). 14 See footnote 5, above. 833 I-34 • Residential allocation: 4,421 units (net increase of 2,526 units from the 2000-2020 General Plan) While Land Use Alternative C would meet all of the project objectives, the combination of the office allocation in Alternative C together with the other land use allocations in Alternative C would not be as effective or as balanced as the Balanced Plan, which includes the lower office allocation in Alternative B, in achieving the project objective of creating a mix of economic development opportunities. Furthermore, the environmental effects from the larger office allocation in Alternative C would be marginally greater than the environmental effects from the office allocation in the Balanced Plan (which has the same office allocation as Alternative B). That is because the Alternative C office allocation is 59 percent greater than the office allocation in the Balanced Plan. Increased allocation to office development would mean more jobs and, as people move to Cupertino to fill those jobs, a higher population. Draft EIR Table 5-2 projects a 70 percent greater increase in jobs and a 75 percent greater increase in population under Alternative C compared to the increases under Alternative B. The increased development and population growth resulting from the Alternative C office allocation would have greater effects on the environment than the office allocation component of the Balanced Plan and Alternative B. Alternative B would reduce air quality impacts, as described in the analysis of Impact AIR- 1, because the Vehicle Miles Traveled (VMT) for Alternative B is lower and reduces the impact to less than significant. See Draft EIR Table 5.5. This is because the mix of development in the Balanced Plan, which includes the same office allocation as Alternative B, represented a better balance of development. In categories where all of the alternatives were found to have significant and unavoidable impacts, namely air quality, noise, and traffic, Land Use C’s office allocation would result in greater environmental impacts, as it represents the greatest amount of development, which would result in higher consumption of non-renewable resources, generate the greatest amount of waste and pollutants, and increase the demand of public facilities and infrastructure. For the foregoing reasons, Land Use Alternative C is hereby rejected as infeasible. E. Environmentally Superior Alternative In addition to the discussion and comparison of impacts of the Balanced Plan and the Alternatives, Section 15126.6(e)(2) of the State CEQA Guidelines requires that an “environmentally superior” alternative be selected and the reasons for such a selection be disclosed. The environmentally superior alternative is the alternative that would be expected to create the least significant environmental effects. Identification of the environmentally superior alternative is an informational procedure and the alternative selected may not be the alternative that best meets the goals or needs of Cupertino. As shown in Draft EIR Table 5-5, the impacts associated with each of the four land use scenarios analyzed in this EIR would essentially be the same. As previously stated, this is 834 I-35 because the recommended mitigation measures would apply to all of the alternatives, and compliance with the General Plan policies designed to reduce environmental impacts would also apply to all future development in Cupertino. However, as shown in Draft EIR Table 5- 5, for Land Use Alternative B air quality Impact AQ-1 (Conflict with or obstruct implementation of the applicable air quality plan) would be less than significant for Alternative B but would be significant and unavoidable for the other alternatives. That is because the mix of development in Alternative B would increase office square footage, but to all lesser extent than Alternative C, while at the same time increasing the residential allocation unlike Alternative A and the No Project Alternative. While Alternative C represents the maximum extent of residential development anticipated by the Plan Bay Area for Cupertino by 2040, Alternative C’s higher increase in office square footage (4,040,231 square feet compared to the lower office increase in Alternative B of 2,540,231 square feet), together with the total increase in residential allocation, does not reflect a balanced jobs-housing ratio that results in lower per capita VMT when compared to Alternative B. Under Alternative C, land uses allocations in the General Plan would generate 897,419 VMT per day (10.47 miles per service population per day in 2013). Based on the future estimates of VMT per person for Cupertino for year 2040, 1,264,271 VMT per day (10.94 miles per service population per day in 2040) would be generated in Cupertino. Accordingly, the daily VMT in the Project Study Area under Alternative C would increase at a slightly greater rate (40.9 percent) between 2013 and 2040 than would the service population of the Project Study Area (34.8 percent). In comparison, under Alternative B, based on the future estimates of VMT per person for Cupertino for year 2040, 1,097,596 VMT per day (10.24 miles per service population per day in 2040) would be generated in the City. Under Alternative B, daily VMT in the Project Study Area would increase at a slower rate (22.3 percent) between 2013 and 2040 than would the service population of the Project Study Area (25.0 percent). When the VMT increase is less than or equal to the projected population increase, this represents a balanced jobs-housing ratio. In identifying an Environmental Superior Alternative, the analysis in the EIR is based on the principle that less development would mean reduced effects on the environment. Each incremental increase in development allocations among the alternatives represents increased population and activity which would result in increased noise, air quality, greenhouse gas, traffic, and utilities impacts. Although a number of these impacts would be significant and unavoidable under every alternative, the severity of the significant and unavoidable impacts would vary according to the development allocations within a given alternative. For example, while Land Use Alternative B would reduce Air Quality Impact AQ-1, as described above in Section VIII.D, the No Project Alternative would be the environmentally superior alternative because it would not allow for new development to occur beyond what is currently planned for in the 2000-2020 General Plan, which would result in the least amount of development in the City and thereby reduce the consumption of renewable resources (e.g., lumber and water) and nonrenewable resources (e.g., fossil fuels, natural gas, and gasoline). Less development would place fewer demands on public 835 I-36 service providers (which could require new facilities), would require fewer road, sewer, water and energy infrastructure improvements, and would generate less waste, which would overall reduce impacts on the environment. In accordance with State CEQA Guidelines Section 15126.6(e)(2), if the environmentally superior alternative is the No Project alternative, the EIR shall also identify an environmentally superior alternative from among the other alternatives. Accordingly, the environmentally superior alternative would be Land Use Alternative A, because less development would occur compared to Land Use Alternative B, Land Use Alternative C, and the Balanced Plan. Under Land Use Alternative A, no new commercial space, hotel rooms or residential units would be permitted beyond the allocations in the current General Plan. For the foregoing reasons, Alternative A is considered the environmentally superior alternative. IX. INCORPORATION BY REFERENCE These findings incorporate the text of the Final EIR for the Project, the Mitigation Monitoring and Reporting Program, City staff reports relating to the Project and other documents relating to public hearings on the Project, by reference, in their entirety. Without limitation, this incorporation is intended to elaborate on the scope and nature of mitigation measures, project and cumulative impacts, the basis for determining the significance of impacts, the comparison of the alternatives to the Project, the determination of the environmentally superior alternative, and the reasons for approving the Project. X. RECORD OF PROCEEDINGS Various documents and other materials related to the Project constitute the record of proceedings upon which the City bases its findings and decisions contained herein. Those documents and materials are located in the offices of the custodian for the documents and materials, which is the City of Cupertino Community Development Department, Cupertino City Hall, 10300 Torre Avenue, Cupertino, CA 95014-3202. XI. NO RECIRCULATION REQUIRED State CEQA Guidelines Section 15088.5 requires a lead agency to recirculate an EIR for further review and comment when “significant new information” is added to the EIR after public notice is given of the availability of the Draft EIR but before certification. No significant new information was added to the Draft EIR as a result of the public comment process. The Final EIR responds to comments, and clarifies, amplifies and makes insignificant modifications to the Draft EIR. The Final EIR does not identify any new significant effects on the environment or a substantial increase in the severity of an environmental impact. 836 I-37 The EIR analyzes full buildout of 2040 growth for Cupertino as projected in Plan Bay Area. The Balanced Plan consists of the same development allocations and Housing Element sites that were analyzed in the EIR for Alternative C except, as described in more detail in the next section below, the office allocation is reduced to the amount analyzed in the EIR for Alternative B, the maximum height limits are reduced except at one location. Accordingly, all portions of the Balanced Plan were analyzed in the EIR, either as part of Alternative C or as part of Alternative B. There are no new significant effects on the environment or a substantial increase in the severity of an environmental impact associated with substituting the smaller office allocation from Alternative B for the original, larger office allocation in Alternative B in order to create the Balanced Plan that are the subject of these Findings nor are there new significant effects on the environment or a substantial increase in the severity of an environmental impact associated with the changes in maximum height limits. For the foregoing reasons, recirculation of the Final EIR is not required. XII. STATEMENT OF OVERRIDING CONSIDERATIONS As set forth above, the City has found that the Project will result in project and cumulative significant adverse environmental impacts related to air quality, noise, and traffic and transportation that cannot be avoided following adoption, incorporation into the Project, and implementation of mitigation measures described in the EIR. In addition, there are no feasible project alternatives that would mitigate or avoid all of the Project’s significant environmental impacts. Section 15093(b) of the State CEQA Guidelines provides that when the decision of the public agency results in the occurrence of significant impacts that are not avoided or substantially lessened, the agency must state in writing the reasons to support its actions. See also Public Resources Code Section 21081(b). Having balanced the economic, legal, social, technological or other benefits of the Project, including region-wide or statewide environmental benefits, against its significant and unavoidable environmental impacts, the City finds that the Project benefits outweigh its unavoidable adverse environmental effects, and that the adverse environmental effects are therefore acceptable. The following statement identifies the reasons why, in the City’s judgment, specific benefits of the Project outweigh the significant and unavoidable effects. The substantial evidence supporting the benefits of the Project can be found in the preceding sections of these Findings, in the Project itself, and in the record of proceedings as defined in Section X, above. The City further finds that each of the project benefits discussed below is a separate and independent basis for these findings. The reasons set forth below are based on the Final EIR and other information in the administrative record. 1) The Vision Statement in the General Plan states that “Cupertino aspires to be a balanced community with quiet and attractive residential neighborhoods; exemplary parks and schools; accessible open space areas, hillsides and creeks; and a vibrant, 837 I-38 mixed use ‘Heart of the City.’ Cupertino will be safe, friendly, healthy, connected, walkable, bikeable and inclusive for all residents and workers, with ample places and opportunities for people to interact, recreate, innovate and collaborate.” In incorporating the office allocation from Land Use Alternative B, the commercial allocations from Land Use Alternatives B and C, and the hotel and residential allocations from Land Use Alternative C, the Project provides the City with a balanced mix of economic development opportunities while seeking to lessen significant impacts by pursuing the highest possible levels of development. 2) The Project provides the City with the commercial development allocation it needs to increase sales and avoid retail leakage in the trade area as, recommended on page 85- 86 of the General Plan Amendment Market Study (BAE Urban Economics, February 13, 2014), and would allow the City flexibility to encourage new commercial uses in other parts of the City in the future that will general additional sales taxes. and as set forth in the project objectives. 3) The Project provides for economic growth by creating employment-related land uses. This will attract new businesses and allow existing businesses to stay and grow within the City, improve sales tax and property tax revenue to help the City maintain a healthy fiscal balance to provide its residents with high quality services. 4) The Project concentrates growth along the City’s major transportation corridors and in the City’s employment centers, which are areas that are within walking distance/bus distance of large employment areas. Encouraging development in existing urbanized areas results in fewer impacts from the construction of new infrastructure, maximizes use of existing impervious surfaces, provides multi-modal transportation opportunities, and reduces miles traveled, which translates into air quality benefits. 5) The Project concentrates growth at locations with existing uses and, as a result, potential future development under the Project would consist largely of either redevelopment of existing building, selective demolition of existing structures and replacement with new construction, or new infill development adjacent to existing uses, all of which would serve to lessen environmental impacts. 6) The Project policies concentrating growth along transportation corridors and in employment centers contributes to community goals of protecting the City’s neighborhoods and connectivity. 7) The Project includes policies that encourage conservation of water and energy resources in conformance with the City’s sustainability goals. 838 I-39 8) The Project is in conformance with the principles of planning sustainable communities by meeting both the present and future housing needs of the City, and fulfills the City Council’s charge to prepare a Housing Element. 9) The Project is consistent with key planning documents, including Plan Bay Area, which is the Bay Area’s Regional Transportation Plan (RTP)/Sustainable Community Strategy (SCS), as well as SB 375, the Sustainable Communities and Climate Protection Act. 10) The Project meets the City’s Regional Housing Needs Allocation (RHNA) of 1,064 units, and provides a moderate surplus above the City’s housing need, or approximately 1,400 units. 11) The Project provides opportunities for increased building heights in key Nodes and Gateways, and makes additional building height and residential density increases contingent on future development projects in Cupertino providing the City with community benefits. 12) The Project provides for revitalizing the Vallco Shopping Mall and transforming it into a locally and regionally significant retail, employment, housing and entertainment destination, which would become the “downtown” of Cupertino. 13) The Gateways and Nodes located within some of the Project’s Special Areas represent key locations in the City that, with the use of design elements, such as buildings, arches, fountains, banners, signage, special lighting, landscaping and public art, have the opportunity to create a memorable impression of Cupertino. These key locations are essential for providing residents, visitors, and workers an attractive, friendly, and comfortable place with inviting active pedestrian spaces and services. XIII. SUMMARY 1. Based on the foregoing Findings and the information contained in the record, the City has made one or more of the following Findings with respect to each of the significant environmental effects of the Project: a. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant environmental effects identified in the Final EIR. b. Those changes or alterations are within the responsibility and jurisdiction of another public agency and have been, or can and should be, adopted by that other public agency. 839 I-40 c. Specific economic, legal, social, technological, or other considerations, make infeasible the mitigation measures or alternatives identified in the Final EIR that would otherwise avoid or substantially lessen the identified significant environmental effects of the Project. 2. Based on the foregoing Findings and the information contained in the record, the City determines that: a. All significant effects on the environment due to the approval of the Project have been eliminated or substantially lessened where feasible. b. Any remaining significant effects on the environment found to be unavoidable are acceptable due to the factors described in the Statement of Overriding Considerations, above. 840 PLANNING COMMISSION STAFF REPORT Agenda Item No. 1 Agenda Date: October 14, 2014 Application No.: GPA-2013-01, GPA-2013-02, SPA-2014-01, Z-2013-01 and MCA-2014-01 (EA-2013-03) Applicant: City of Cupertino Property Location: City-wide SUBJECT General Plan Amendment, 2014-2022 Housing Element, associated Rezoning, Zoning text amendments and Specific Plan Amendment. RECOMMENDED ACTION Staff recommends that the Planning Commission recommend that the City Council in accordance with the Draft Resolutions: 1. Approve Resolution Recommending Certification of an Environmental Impact Report, adoption of Findings and a Statement of Overriding Considerations, and adoption of Mitigation Measures and a Mitigation Monitoring and Reporting Program, (EA-2013-03) in substantially similar form to the attached Resolution 6760 (Attachment 1); 2. Adopt GPA-2013-01 in substantially similar form to the attached Resolution 6761 (Attachment 2): a. Draft General Plan (Community Vision 2040); and b. General Plan Map Amendments. 3. Authorize staff to, in substantially similar form to the attached Resolution 6762 (Attachment 3): a. Forward the Draft 2014-2022 Housing Element to the State Department of Housing and Community Development (HCD); and b. Use the prioritized list of Alternative Housing Element sites (in case one or more of the adopted sites are not accepted by HCD as Housing Element sites). 4. Approve Zoning Map Amendment, Z-2013-03, in substantially similar form to the attached Resolution 6763 (Attachment 4); OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3308 • FAX (408) 777-3333 841 5. Approve Municipal Code Amendment, MCA-2014-01, in substantially similar form to the attached Resolution 6764 (Attachment 5); and 6. Approve Specific Plan Amendment, SPA-2014-01, in substantially similar form to the attached Resolution 6765 (Attachment 6). BACKGROUND On August 21, 2012, the City Council directed staff to begin a General Plan amendment in order to replenish citywide office, commercial, and hotel development allocations, consolidate individual requests from property owners, inform the Vallco Shopping District Specific Plan, update to address State law, and address any clean-up required. In addition, in November 2013, the City initiated an updated of the State-mandated Housing Element of the General Plan. The 2012-2022 Housing Element, which is a required component of the General Plan, identifies policies and appropriate locations for future housing in Cupertino. The Housing Element Update was also combined with the General Plan Amendment process so the City and community could fully evaluate and discuss issues in one comprehensive outreach and planning process. ALTERNATIVES The General Plan Amendment process has involved over 18 months of extensive community discussions and input provided during several public meetings, workshops, online comment forms and surveys, and study sessions with the Housing Commission, Planning Commission and City Council. A detailed listing of the public input meetings is provided later in this report. The staff reports for the following study sessions: February 12, 2014 Housing Commission, February 19, 2014 Planning Commission, March 4, 2014 City Council, April 1, 2014 Joint Planning Commission/City Council are attached for both the General Plan and Housing Element projects (Attachment 7). After extensive input from the community, property owners, the Housing Commission and the Planning Commission, the City Council authorized studying the following alternatives in the Environmental Impact Report (EIR) that was prepared for the project. A brief discussion of alternatives is provided below (see Attachment 8 for Concept Alternative maps). The EIR has a detailed description of each alternative. A table showing specific allocations is provided later in the Development Allocations discussion later in this report. Alternative A Alternative A consists of the following themes:  Maintain the policies of the 2005 General Plan  Increase office and hotel development allocations  Streamline General Plan area boundaries Alternative A identifies how growth would occur if the City largely continues the policies of the current 2005 General Plan, while making minor development allocation and boundary changes. 842 Under the land use standards in the 2005 General Plan, Vallco Shopping Mall would remain the same under this alternative. Alternative A increases city-wide office and hotel allocation but does not increase allocations in the commercial and residential categories. Alternative B Alternative B is derived from the following themes:  Focus new growth along major mixed-use corridors  Revise height standards at key nodes, gateways and sub areas along major mixed-use corridors  Increase office, hotel and residential development allocations  Support the redevelopment of the Vallco Shopping District by reallocating existing commercial allocation  Streamline General Plan area boundaries Alternative B identifies how the City can focus development along major mixed-use corridors in order to create more complete commercial, office and entertainment areas, and to address mid- term housing needs. It increases development allocations at a level above Alternative A in order to better capture retail sales leakage and regional demand for office development. This alternative also envisions the transformation of the Vallco Shopping Mall into a retail, employment, housing and entertainment destination. Alternative C Alternative C is derived from the following themes and reflects the property owners’ requests:  Support the redevelopment of the Vallco Shopping District by reallocating existing commercial allocation  Revise density and height standards at key nodes, gateways and sub areas along major  mixed-use corridors  Increase office, hotel and residential development allocations  Streamline General Plan area boundaries Alternative C identifies a way to transform the Vallco Shopping Mall into a locally and regionally significant retail, employment, housing and entertainment destination, and account for a large portion of the City’s RHNA. Under this alternative, the Vallco area becomes the “downtown” of Cupertino, serving the mixed-use hub for residents, workers and the larger region. Alternative C also increases development allocations at a level above both Alternatives A and B in order to fully capture retail sales leakage and regional demand for office and hotel development. Heights and densities in key nodes, gateways and sub-areas reflect areas along the five mixed-use corridors where City-wide development allocation in the General Plan may be located. 843 DISCUSSION DRAFT GENERAL PLAN (COMMUNITY VISION 2040) The General Plan is a State-mandated document and provides the vision for Cupertino’s future It sets the City's policy direction in a number of areas including land use, mobility, housing, open space, infrastructure, health and sustainability through goals, policies, and strategies. The following is a discussion of state and regional laws, best practices and community input that have shaped the draft General Plan (Community Vision 2040). Community Vision 2040 has been informed by changes in Federal, State and regional regulations, best practices and community input, and achieving the community-building, sustainability and economic and fiscal goals in the Guiding Principles. The following section is a discussion of items that have been informed the Draft General Plan (Community Vision 2040). State and Regional regulations and best practices 1. Climate Change - The Global Warming Solutions Act of 2006 (AB 32) set a target to reduce California greenhouse gas emissions to 1990 levels by year 2020. In addition, the Governor signed Executive Order S-3-05 to further require California to reduce greenhouse gas emissions (GHG) by 80 percent below the 1990 levels by year 2050 (EO, 2005). The policies in Community Vision 2040 are consistent with these regulations. 2. Land Use and Transportation - The Sustainable Communities and Climate Protection Act of 2008 (SB 375) calls on each of the state’s 18 metropolitan areas to develop a Sustainable Communities Strategy to accommodate future population growth and reduce greenhouse gas emissions from cars and light trucks. Plan Bay Area, jointly adopted in 2013 by the Association of Bay Area Governments (ABAG) and the Metropolitan Transportation Commission (MTC), is the region’s first Sustainable Communities Strategy to meet the requirements of SB 375 through the year 2040. Community Vision 2040 is consistent with the principles of SB 375 by focusing growth along major transportation corridors and the City’s Priority Development Area (PDA) along Stevens Creek and North De Anza Boulevards defined in Plan Bay Area. 3. Complete Streets and Connectivity – The California Complete Streets Act (2008) places the planning, designing, and building of complete streets into the larger planning framework of the General Plan by requiring jurisdictions to amend their Mobility Elements to plan for multimodal transportation networks. 4. Performance Measures for Mobility - Senate Bill 743 (2013) creates a process to change the way that transportation impacts are analyzed under the California Environmental Quality Act (CEQA) to promote the state’s goals of reducing greenhouse gas emissions and traffic- related air pollution, promoting the development of a multimodal transportation system, and providing clean, efficient access to destinations. Specifically, SB 743 requires an alternative to automobile level of service (LOS) for evaluating transportation impacts. 5. Sustainability – Various elements in Community Vision 2040 incorporate goals and policies related to air quality and greenhouse gas emissions targets set by AB 32, SB 375 and the Bay 844 Area Air Quality Management District (BAAQMD). The Land Use and Community Design element focuses future growth along major transportation corridors consistent with past practice and SB 375. The focus on multi-modal transportation and complete streets in the Mobility element is consistent with past practice and recent State and regional regulations and guidance. A reference to the Climate Action Plan has been added to achieve State and regional greenhouse gas targets and municipal policies have been updated in the Sustainability element. 6. Housing Element – recent changes in Housing Element law have been incorporated in addition to the 2014-2022 Regional Housing Needs Allocation (RHNA) for the City. This section is discussed in greater detail later in this report. Community Ideas and Best Practices 1. Community Benefit – The idea was first discussed by a community member and the Council was interested in exploring the possibility. The concept includes requiring community benefits for additional height. The concept is discussed later in this report. 2. Walking and biking to schools, parks and shopping – This idea was discussed by several community members in public workshops and is consistent with SB 375, AB 32 and Complete Streets and best practices. 3. Design of mixed-use projects – A “mixed-use village” concept is recommended for mixed- use projects that include residential development. The concept was developed from Council, Planning Commission and public input and best practices regarding mixed-use projects. These include provision of viable retail, gathering places, pedestrian-oriented architecture and streetscape improvements, improving connectivity and neighborhood buffers. A similar but limited discussion is provided for “neighborhood center” redevelopment. 4. Vallco Shopping District –Public input from workshops regarding the transformation of the Vallco Shopping District into an active community gathering place and regional destination have been included. A detailed discussion is provided later in this report. 5. Calculation of residential density – Council and a member of the public requested changing calculation from density of the gross lot area (which includes portions of adjacent streets) to density of the lot area (which does not include adjacent streets). This change has been made to the General Plan and the Zoning Ordinance. The density and residential yield of Housing Element sites reflects this change. Chapters 1. Planning Areas - A section on Planning Areas has been added. It divides the Planning Areas into Special Areas (already part of the 2005 General Plan) and Neighborhoods (partially discussed in the 2005 General Plan). It highlights the special characteristics and the community vision for each planning area. Special Areas are generally consistent with the 2005 General Plan (and per changes discussed in the alternatives discussion) and include major mixed-use corridors where changes can be expected in the future. Neighborhoods are mostly residential areas that are intended to be preserved, with improved connections to 845 parks, schools and services and enhanced neighborhood centers, and buffers where there may be adjacent commercial development. 2. Elements: a. Land Use and Community Design – This section includes general policies as well as specific policies for the Planning Areas. It retains the policies in the 2005 General Plan of urban design, connectivity and pedestrian-oriented design. Consistent with previous policies and in compliance with state and regional requirements, growth is focused in transportation corridors and the PDA as discussed earlier. It also incorporates both, the Balanced Plan recommendations and a community benefits policy, discussed below. b. Housing – This section contains the 2014-2022 Housing Element draft including policies and sites to meet State policy mandates and RHNA requirements. A detailed discussion is provided later in this report. c. Mobility (previously Circulation) - The policies provide a vision to help implement a “complete streets" approach. This approach acknowledges the need for streets that are designed to be used by pedestrians, bicycles and transit modes, not just automobiles. This will help prioritize and direct future roadway improvements. Community Vision 2040 continues to encourage coordination with regional planning agencies to meet local transportation needs. It also meets the new State guidance by acknowledging that new methods are needed to monitor transportation conditions for all travel modes instead of the old standard of level of service (LOS). d. Recreation and Community Services (previously in Land Use and Community Design) – This section primarily retains existing policies, while including principles of sustainability and master planning of parks and recreational programs. An option to evaluate a future increase in the City’s park standards from the current three acres per thousand persons is also included. New and planned parks have been added to the inventory. The trails section has been revised to reflect connectivity along trails in general and potential alternative trail options where decisions have yet to be made on the final routes. e. Infrastructure (previously in Environmental Resources/Sustainability) – this section has been updated to include current information and incudes principles of sustainability and master planning, when designing and implanting infrastructure projects. f. Sustainability (previously Environmental Resources/Sustainability) – This section has been updated to comply with regional requirements and to reflect the City’s current policies and the Climate Action Plan. g. Health and Safety – This section has been updated per new local and regional requirements. 3. Other - The discussion in each element has been consolidated to include a ”context” section describing the existing situation, information on changes to the environment, and regulations and a “looking forward” section that outlines best practices that the City can incorporate to be better equipped for the future. General goals, policies and strategies are 846 outlined followed by specific planning area policies, where applicable. In addition a number of repetitions and redundancies have been removed and consolidated where feasible. Balanced Plan Development Allocation Community Vision 2040 is a 25-year plan for the City’s future that considers community goals for active gathering places, health, sustainability, economic development and fiscal reliance, as well as regional requirements and mandates, while balancing residents’ need for minimizing traffic, air quality, and other environmental impacts.  Economic and Fiscal – the City’s goal for the next 25 years is to ensure that companies and businesses thrive and new businesses are attracted to the City and that property owners have incentives to maintain and enhance property. The City Council recognized this when they authorized the increase in development allocation as part of the General Plan process. Maintaining an adequate allocation for development will help revenues grow so that the City can continue to provide excellent community services. A Market Study was conducted to see the realistic economic demand for various uses through 2035 (Attachment 9). It notes that existing commercial space in the City’s General Plan Allocation pool is adequate to meet the high end of demand through 2035 and indicates market support for an additional 3.6 million net square feet for office space, 985 net hotel rooms and 4,420 residential units for the same period (close to Alternative C). o Office – Since the 2005 General Plan was adopted, the City has drawn down about 525,000 square feet through Apple and Main Street and other office development in the City, and currently only has a balance of 17,113 square feet remaining in city-wide office allocation. To account for redevelopment at the Vallco Shopping District and new office development for the next 25 years, an increase of 2,000,000 square feet is proposed (consistent with Alternative B). In the Balanced Plan, office allocation is balanced with other land uses to reduce environmental impacts while recognizing the City’s economic and fiscal goals. o Hotel – Since the 2005 General Plan was adopted, the City has drawn down 303 hotel rooms from the allocation leaving 339 rooms at time of project initiation. Hotels bring in considerable revenue, which will help realize community goals of economic and fiscal stability. Consistent with the Market Study, the recommendation is to add 1,000 more hotel rooms to the allocation. This is also consistent with Alternative C. o Residential – The State-mandated RHNA requirement is 1,064 units with about 1,400 recommended by the Housing consultant after consulting with the HCD. Subtracting 1,400 units from the remaining allocation of 1,895 units leaves only 495 units through 2040, which will not be enough to meet RHNA targets for the two additional housing element cycles through 2040 per Plan Bay Area. Alternative A, which is consistent with the 2005 General Plan and Alternative B which only meets 75% of the Plan Bay Area targets, do not achieve the regional target. However Alternative C meets 100% of the targets set by Plan Bay Area. To ensure that the City is consistent with these regional targets, the recommendation is to increase the residential development allocation by 2,526 units (to 847 4,421 units which includes the 1,400 recommended for the 2014-2022 Housing Element cycle). However, the City can adopt strategies for managing the amount and form of housing growth as follows:  Selecting Housing Element sites for up to 1,400 units to meet the demand for the 2014- 2022 RHNA period.  Revising the General Plan so that on sites with a mixed-use residential designation, residential is a permitted use only on Housing Element sites. Conditional use permits will be required on mixed-use Housing Element sites that propose units above the allocation in the Housing Element, and on Non-Housing Element mixed-use sites. Related changes will have to be made to the Municipal Code, Specific Plans and Conceptual Plans.  Form - The General Plan includes a “mixed-use village” strategy so that mixed-use residential sites provide substantial and viable retail, and also create a livable environment for residents, shoppers and workers on and around the site. Table 1 below is a comparison of the Balanced Plan with other alternatives studied in the EIR. Key Question 1: Development Allocation 1. What should the City plan for in terms of Development Allocation for office, commercial, hotel and residential units through 2040? Community Benefits Program As the City’s resident and worker population increases, additional amenities will be necessary to maintain and the livability of the community. The Community Benefit Program is one of the Table 1 - Development Allocation Per Alternative (through 2040) Use Built/ Approved No Project/ 2005 General Plan Alternative A Alternative B Balanced Plan Alternative C Office (sf) Net Increase 8,929,775 540,231 1,040,231 1,040,231 2,540,231 4,040,231 0 500,000 1,000,000 2,000,000 3,500,000 Commercial (sf) Net increase 3,729,569 701,413 701,413 701, 413 701,413 701,413 0 0 0 0 0 Hotel (rooms) Net Increase 1,090 339 600 839 1,339 1,339 0 261 500 1,000 1,000 Residential (units) Net Increase 21,339 1,895 1,895 3,316 4,421 4,421 0 0 1,421 2,526 2,526 Notes: 1. Office – includes Major Company allocation of 523,118 sf. 2. Commercial - assumes that the existing Vallco mall square footage (1,267,601 sf) will be demolished and 600,000 sf min. will be built at site, with the remaining (625,335 sf) moved to the City-wide pool. 3. Residential - includes the 1,400 units recommended for the 2014-2022 Housing Element. 848 key tools to help finance and achieve those amenities that maintain and increase the community’s quality of life. The Program enables the community to get amenities in return for allowing additional specified heights within specified areas in the City. It also provides certainty as to what those additional heights might be and where they can be placed. It requires a Development Agreement, which means that the city has to agree to the benefits and amenities provided. Key elements of the program include: 1. The proposed level of benefit is equivalent to at least 15% of the project valuation attributed to the increase in height (decided through preparation of a project proforma). 2. Projects must provide a ground floor retail component; and one or more of the following benefits: a. Transportation and Mobility Improvements (bike, pedestrian facilities, participation in a community shuttle program, etc.) b. Public Facilities (land or space). c. Senior Housing- 15% of housing that is not already targeted towards seniors. d. Public Art and Cultural Facilities (new or expansion to museum, teen center, etc.) e. Parks and Open Space (land/improvements within project or off-site) In lieu of the benefits outlined in Item 2, a “Cash-in-Lieu Contribution” may be made to the City for purchase of land, capital improvements or operations related to items a, b, d, e, and towards the construction of affordable housing. Key Question 2: Community Benefits 1. Should Cupertino have a Community Benefits Program? 2. If yes, does the Planning Commission have any revisions to: a. Value of the community benefits? b. Specific program items – retail requirement or other items? Heights Community Vision 2040 envisions keeping heights and development standards in most of the City consistent with those in the 2005 General Plan. However, recognizing that the City needs to achieve regional housing goals, economic reliance and fiscal goals, while ensuring that adequate sites are reserved for future housing element cycles, the Balanced Plan recommends targeted growth in certain gateways and nodes. Additionally, in order to achieve sustainability and connectivity principles, the plan recommends focusing growth in major transportation corridors. Heights in the Balanced Plan are generally lower than those recommended in Alternative B. Additionally, consistent with the practice in the 2005 General Plan for the Vallco area, heights above the base height in key gateways and nodes require retail on the ground floor. Additional heights above that are specified in three nodes – N. De Anza Gateway (Cupertino Inn), N. Vallco Gateway West (Kimco and hotel area near Hwy 280), and the Vallco area (Vallco Shopping District to the east of Wolfe Road and South Vallco - north of Vallco Parkway) with 849 the provision of community benefits. In addition, the recommendation is to keep the Building Planes along all arterials at 1:1. Currently, the only area not consistent with this is in the South and North Vallco areas along Homestead Road and Stevens Creek Boulevard. The recommendation will keep consistent building streetscape along the street. No changes are recommended to the 35-foot setback in the Heart of the City Special Area. If the Planning Commission does not recommend the community benefit program, the heights related to community benefits will not be applied. Table 2 below provides a comparison of heights in Special Areas only where they are recommended to be changed. Table 2– Heights & Densities In Special Areas Per Alternative Planning Area 2005 General Plan Alternative A Balanced Plan (recommended) Alternative B Alternative C Heart of the City Special Area Oaks Gateway − 45 ft. − 25 du/ac No change − 45 ft.; or 60 ft. with retail − 25 du/ac − 35 du/ac if HE site − 45 ft.; or 60 ft. with retail − 35 du/ac − 60 ft; or 75 ft. with retail − 35 du/ac North Crossroads Node − 45 ft. − 25 du/ac No change − 45 ft; or 60 ft. with retail − 25 du/ac − 35 du/ac if HE site − 45 ft; or 60 ft. with retail − 35 du/ac − 60 ft.; or 75 ft. with retail − 40 du/ac City Center − 45 ft. − 25 du/ac No change − 60 ft.; or 75 ft. with retail; or 90 ft. with community benefits on specific sites − 25 du/ac − 60 ft.; or 75 ft. with retail; or 90 ft. with community benefits on specific sites − 25 du/ac − 75 ft.; or 90 ft. with retail; or 110 ft. with community benefits on specific sites − 25 du/ac South Vallco Park − 45 ft.; or 60 ft.with retail − 35 du/ac No change No change − 60 ft.; or 75 with retail; or 110 ft. with community benefits − 35 du/ac − 75 ft.; or 90 with retail; or 160 ft. with community benefits − 35 du/ac North De Anza Blvd Special Area − 45 ft. − 25 du/ac No change − 60 ft. − 25 du/ac − 60 ft. − 25 du/ac − 75 ft. − 25 du/ac 850 Table 2– Heights & Densities In Special Areas Per Alternative Planning Area 2005 General Plan Alternative A Balanced Plan (recommended) Alternative B Alternative C Vallco Shopping District West of Wolfe Road − 45 ft.; or 60 with retail − 35 du/ac No change − 45 ft.; or 60 ft. with retail; or 75 ft. with community benefits (for a 200 ft. depth along the Wolfe Rd. property line and set back 200 ft. from the Stevens Creek Blvd. property line) − 35 du/ac − 45 ft.; or 60 ft. with retail; or 75 ft. with community benefits along Stevens Creek Blvd. and Wolfe Rd. − 35 du/ac − 60 ft.; or 75 ft. with retail; or 85 ft. with community benefits along Stevens Creek Blvd. and Wolfe Rd. − 35 du/ac East of Wolfe Road − 45 ft.; or 60 with retail − 35 du/ac No change − 60 ft.; or 75 ft. with retail; or 90 ft. with community benefits − 35 du/ac − 60 ft.; or 75 with retail; or 110 ft. with community benefits − 35 du/ac − 75 ft.; or 90 with retail; or 160 ft. with community benefits − 35 du/ac Homestead Special Area North De Anza Gateway − 45 ft. − 35 du/ac No change − 45 ft.; or 60 ft. with retail; or 90 ft. for a hotel and major convention center with community benefits − 35 du/ac − 60 ft.; or 75 with retail; or 95 ft. with community benefits − 35 du/ac − 60 ft.; or 75 with retail; or 145 ft. with community benefits − 35 du/ac Stelling Gateway (east of Stelling) − 45 ft. − 35 du/ac No change − 45 ft.; or 60 ft. with retail − 35 du/ac − 45 ft.; or 60 ft. with retail − 35 du/ac − 45 ft.; or 60 ft. with retail − 35 du/ac 851 Table 2– Heights & Densities In Special Areas Per Alternative Planning Area 2005 General Plan Alternative A Balanced Plan (recommended) Alternative B Alternative C North Vallco Park Special Area N. Vallco Gateway (west of Wolfe Rd.) − 60 ft. − 25 du/ac No change − 60 ft.; or 90 ft. (for a 200 ft. depth along Wolfe Road property line) for hotel and major convention center with community benefits − 25 du/ac − 60 ft.; or 75 with retail; or 95 ft. with community benefits − 25 du/ac − 60 ft.; or 75 with retail; or 145 ft. with community benefits − 25 du/ac N. Vallco Gateway (east of Wolfe Rd. – Hamptons site) − 60 ft. − 25 du/ac No change − 75 ft. (buildings located within 50 ft. of property lines abutting Wolfe Rd, Pruneridge Ave. & Apple Campus 2 site shall not exceed 60 ft.). − 25 du/ac − 65 du/ac if HE site − 60 ft.; or 75 with retail; or 95 ft. with community benefits − 65 du/ac − 60 ft.; or 75 with retail; or 145 ft. with community benefits − 110 du/ac South De Anza Boulevard Special Area Two areas: S. De Anza Blvd − 30 ft. − 25 du/ac S. Sunnyvale - Saratoga − 30 ft. − 15 du/ac. Merge into one area for South De Anza Blvd − 30 ft. − 25 du/ac Same as Alternative A Same as Alternative A Same as Alternative A Building planes along arterials − 1:1 along all arterials − 1:1.5 in South Vallco along Stevens Creek Blvd & North Vallco along Homestead Rd. No change 1:1 along all arterials (No change to Heart of the City setback of 35 ft.) 1:1 along all arterials (No change to Heart of the City setback of 35 ft.) 1:1 along all arterials (No change to Heart of the City setback of 35 ft.) 852 Key Question 3: Building Heights 1. Does the Planning Commission have any recommended changes to the Balanced Plan heights recommended in the Special Areas? Densities are discussed in the Housing Element sites discussion. Vallco Shopping District The Vallco Shopping Center has always been envisioned as a regional shopping destination and a key revenue generator for Cupertino. The mall, which was originally constructed between 1974 and1979 functioned as a regional shopping destination and a source of revenue for the City. As discussed in the Retail Strategy Report (Attachment 10), the emptying of the mall continued from the 1990’s into the mid 2000’s. Due to reasons including the fractured property ownership, operating restrictions easement agreements, and the competitive nature of regional mall operation, leasing, and management, Vallco was unable to compete with the larger and more sophisticated operators of Stanford and Valley Fair. Incomplete development, defaults from prior ownerships, prolonged and unrealized redevelopment plans, management changes, and other setbacks have exacerbated the situation. Throughout the outreach process, there was a consistent message from the community – to make Vallco a shopping, entertainment and dining destination and gathering place. Ideas for the area ranged from a re-tenanting and façade improvement program to re-imagining the site as a mixed-use pedestrian-oriented “town center-style” project. The Retail Strategy outlined options for the Vallco Shopping Center including re-imagining the site as a “downtown” or “town center” with a mix of retail, hotel, office and residential uses. The other option included reducing and relocating the retail portion to the west side and opening the east side up to redevelopment with office, hotel and residential uses. The City has two basic options for Vallco with a variety of options in between. 1. Keep Existing Zoning – The 2005 General Plan encourages redevelopment as a mixed-use site with residential and retail uses. However, the zoning, which is a combination of General Commercial (CG) and Planned Regional Shopping does not currently allow residential or office uses. As discussed in the Retail Strategy Report, retail rents alone will not attract the kind of investment needed to adapt the center to the changing needs of today’s retail environment. Therefore, without the introduction of other more profitable uses, such as office or residential, the center will most likely continue to deteriorate. The City’s goals of economic and fiscal stability and providing a cohesive and vibrant, shopping, dining and entertainment destination are not likely to be met. 2. General Plan and Zoning Amendment – the inclusion of office and residential uses along with a substantial retail/entertainment component would help to create a vibrant, high-quality, community gathering place, and entertainment and lifestyle shopping destination. However, partial redevelopment has not been successful in the past. Therefore, a successful development strategy for the site will have to include: complete redevelopment of the site, a 853 Master Developer, and adoption of a Specific Plan with phasing and infrastructure improvements, and a “Town Center” format. Based on the Retail Strategy Report, a successful mix of uses would include 500,000-600,000 square feet of retail with a mix of residential, hotel and office uses. The Draft General Plan (Community Vision 2040) recommends 600,000 square feet of retail uses (30% of which can be entertainment use), 600 units, 375 hotel rooms and about 1,000,000 square feet of office space for the Vallco Shopping District. It also requires a Specific Plan and the components discussed above. The Specific Plan process would be able to include a robust community participation component. This would allow the City to achieve community goals for a shopping and dining destination, economic and fiscal goals, and a portion of the City’s Housing Element requirement. Key Question 4: Vallco Shopping District Does the Planning Commission agree on the Specific Plan and “town-center” concept with a mix of retail/entertainment, residential and office in the Vallco Shopping District? Other Revisions to the Land Use Designations The following changes are being recommended related to Land Use designations  PG&E site (Homestead Road east of Blaney Avenue) – The General Plan Land Use designation is recommended to be amended from Quasi-public/Institutional to Commercial/Quasi-Public/Institutional. While PG&E does not currently anticipate any changes to their current operations, they are not opposed to the change as long as it allows them to continue the use at the current site. The revised designation would allow PG&E to continue the use at the site, while allowing a future commercial opportunity, if PG&E chooses to sell it in the future .  Mirapath (Blaney Avenue) – As requested by the applicant and property owners, the General Plan Land Use designation on this site has been revised from Industrial to Commercial/Industrial. The amendment is being requested since the site is small and can’t incorporate industrial uses successfully. The amendment will allow the site to be used for commercial office and continue to allow light manufacturing uses.  Other Minor changes: Revisions to sites to ensure that the General Plan Land Use designations and zoning are consistent. A complete list of sites is in Table 3-22 in the Environmental Impact Report. HOUSING ELEMENT Context In accordance with State law, General Plans in California cities must contain a Housing Element. State law requires that each city and county update its Housing Element on a regular cycle established in the Government Code. The Housing Element for the 2007-2014 planning period was adopted in 2010 (see Attachment 11). For the current cycle, the updated Housing Element must be adopted by January 31, 2015 (plus a 120-day grace period). If this adoption 854 deadline is met, the planning period for this cycle extends from adoption to January 31, 2023 (or eight years). Otherwise, the City must update the Housing Element again in 2019 (every four years). State law also requires that the Element be reviewed by a State agency—the Department of Housing and Community Development (HCD)—to certify compliance with State law. Housing Element Content Requirements The Housing Element is the City’s primary policy document regarding the development, rehabilitation, and preservation of housing for all economic segments of the population. Per State Housing Element law, the Housing Element must be periodically updated to:  Examine the local need for housing with a focus on special needs populations (Needs Assessment)  Analyze potential constraints to new housing production (Constraints Analysis)  Describe goals, policies and implementation programs to achieve local housing objectives (Housing Plan)  Outline the community’s housing production objectives consistent with State and regional growth projections per the Regional Housing Needs Allocation (RHNA) and identify adequate sites for the production of housing serving various income levels (Housing Resources)  Evaluate the Housing Element for consistency with other General Plan elements (Consistency with General Plan)  Evaluate accomplishments in implementing programs in the previously adopted 2007-2014 Housing Element, and evaluate the effectiveness and appropriateness of continuing these programs in the 2014-2022 Housing Element (Review of Previous Housing Element) A detailed discussion of these topics is provided in Attachment 12 – Housing Commission staff report dated August 28, 2014 Housing Resources & Regional Housing Needs Allocation (RHNA) One of the primary requirements of State Housing Element law pertains to the Regional Housing Needs Allocation (RHNA). The RHNA is an estimate of state-wide projected housing construction needs and is based on regional allocations provided by the Department of Housing and Community Development (HCD) to regional councils of government. The Association of Bay Area Governments (ABAG) conducted the process to determine RHNA allocations for the 101 cities and nine counties in the Bay Area. The City of Cupertino’s RHNA allocation is 1,064 new housing units between 2014 and 2022. The City can take credit for a total of 62 units (30 units approved and 32 second units anticipated). As a result, the City has to identify sites for the construction of the balance or 1,002 units. HCD typically requires jurisdictions to provide a moderate surplus of units in case sites are not developed, or are developed at densities lower than those expected in the Housing Element. This is more so the case, when a good portion of a jurisdiction’s sites are in mixed-use zones and could be developed without residential uses. In the past, three of the 2007-2014 855 Housing Element sites were developed with non-residential uses (portion of Apple Campus 2, Kiddie Academy, and Saich Way Station). Based on past discussions with HCD and experience with Housing Elements for other jurisdictions, and since the majority of the City’s sites are in mixed-use zones (approximately 68%), the City’s consultant recommends an additional 25-40 percent above the City’s remaining housing need or a total of 1,250-1,400 units. Draft 2014-2022 Housing Element The Draft 2014-2022 Housing Element (see Attachment 3) draws strongly from the 2007-2014 Housing Element. The input received after several community meetings (including stakeholder interviews in 2013, three community workshops/open houses, and four study sessions— outlined in more detail below under Public Noticing and Outreach), very closely reflects the input received during preparation of the previous Housing Element. As a result, the draft 2014- 2022 Housing Plan reflects minimal changes from the 2007-2014 Housing Plan. The following changes are recommended (most are for compliance with State and regional requirements):  Policies and programs have been reformatted to reduce redundancy and reorganized for ease in reading and implementing;  Programs have been revised to ensure that the 2014-2022 Housing Element complies with State law. Specifically, programs were revised to encourage housing opportunities for extremely low-income households (AB 2634) and persons with developmental disabilities (SB 812). Programs were also added to reflect amendments to the zoning ordinance related to density bonuses, emergency shelters, and farmworker and employee housing to comply with State law and to amend the Heart of the City Specific Plan to revise the method in which residential density is calculated in mixed-use developments.  A new goal to highlight City efforts in energy conservation regarding new and existing development has been added;  An existing general plan policy related to mixed-use development to encourage development near transportation facilities and employment centers has been added to the Housing Plan;  Amendments have been made in the following areas to comply with State Law and the outcome of recent litigation: o Redevelopment Funding: Redevelopment Agency (RDA) housing set-aside funds, which used to be a primary local funding source for affordable housing in the past, are no longer available to assist in new affordable housing development or acquisition/rehabilitation of existing units for conversion into affordable housing. This loss is associated with the Governor’s 2011 State budget revisions and subsequent court cases, making funding sources for affordable housing significantly more constrained. o Housing Mitigation Program: The City’s affordable housing program—the Housing Mitigation Program—has been amended to comply with recent litigation. A 2009 court- case (Palmer vs. the City of Los Angeles) has resulted in cities suspending or amending the portion of their Housing Mitigation program requiring affordable units to be included in market-rate rental developments. 856  Housing Preservation Program: The existing Rental Preservation Program has been amended to provide mitigation for impacts on displaced tenants in developments with four or more units. Housing Sites The Housing Commission, Planning Commission, and City Council have conducted multiple study sessions and community workshops to review potential housing sites to meet the RHNA. On April 1, 2014, the City Council authorized staff to prepare environmental review for three alternatives (A, B and C) for a maximum of nineteen (19) sites based on the criteria outlined below. On August 28, 2014, the Housing Commission recommended adoption of the Draft 2014- 2022 Housing Element and the Low-High priority listing for the sites. HCD Criteria for Site Selection HCD reviews each Housing Element’s sites inventory to determine if adequate sites have been identified to meet the RHNA. Preparation of a “site suitability analysis” is an important step in addressing the adequate sites requirement. This analysis must demonstrate that identified sites can accommodate the housing needs—by income level—within the current planning period of the element (2014-2022). The criteria are listed below and discussed in detail in Attachment 12 – Housing Commission staff report dated August 28, 2014.  Existing Use on the Site  Realistic Potential for Recycling  Site Size and Ownership Patterns  Development Density (to meet the minimum affordability criteria of 20 units/ac at 85% of maximum density) Other Criteria for Site Selection In addition to the State-wide criteria, the Sustainable Communities Strategy/One Bay Area Plan (discussed earlier) contributes additional criteria regarding what makes a desirable housing site in the ABAG region. The City’s General Plan policies are generally consistent with the strategies in the One Bay Area Plan. In addition, criteria, consistent with the City’s 2005 General Plan, have also been identified in order to ensure functional and attractive development occurs on the sites selected. Key themes include:  Locate development along major transportation routes with access to transit or within ½ mile of a VTA Priority Development Area (PDA).  Locate higher density housing in closer proximity to employment and activity centers  Corner lot(s) with large frontage preferred – such parcels provide the most flexibility to accommodate mixed-use developments and avoid impeding parking and connectivity between mid-block parcels  Incentive for redevelopment –Sites with older, under-performing retail shopping centers have also been evaluated as to whether housing or office would be necessary to provide an incentive to improve higher-quality retail. 857 Housing Element Sites While all 19 sites have been studied for potential impacts in the EIR, 18 sites are available for selection. This is because the largest property owner associated with Site 17 (Intrahealth/Office/Tennis Courts at Stelling and Homestead Roads) sent the City a letter expressing their desire to not be included in the Housing Sites Inventory shortly after the City authorized study of the 19 sites. The remaining sites have been prioritized by how well they meet the criteria outlined above. Table 3 below shows the Recommended (High) and alternate Housing Element (Moderate and Low-Moderate) sites listed in order of priority. Sites that score low in meeting the criteria are recommended to be removed from the Alternate Housing Sites list. A detailed table of all sites is provided in Attachment 13. It should be noted that the density of the sites in Alternative A, even if all of them were included, does not meet the upper end of the 25-40% surplus (1,250- 1,400 units) recommended to meet the remaining RHNA. The densities recommended in the Balanced Plan are based on the following goals:  Provide densities for existing sites that allow enough of an incentive to assume that the sites would be developed in the 2014-2022 period (HCD criterion).  Meet HCD affordability criterion (min. 20 du/ac at 85% of maximum density; ~ 25 du/ac).  Ensure that there are enough sites for future housing elements. TABLE 3 Priority No. Site Name Priority (meets criteria) Density and Realistic Capacity (85% of max. density) Alternative A Balanced Plan (Recommended) Alternative B Alternative C Recommended Housing Element Sites 1. The Oaks High 25 du/ac 0 du 35 du/ac 235 du 35 du/ac 235 du 35 du/ac 235 du 2. Vallco Shopping District (west) High 35 du/ac 0 du 35 du/ac 600 du 35 du/ac 600 du 35 du/ac 800 du 3. Hamptons (342 units existing) High 25 du/ac 0 du additional 65 du/ac 344 du additional 65 du/ac 344 du additional 110 du/ac 820 du additional 4. United Furniture + other High 25 du/ac 103 du 25 du/ac 103 du 25 du/ac 103 du 25 du/ac 103 du 5. Barry Swenson High 25 du/ac 11 du 25 du/ac 11 du 25 du/ac 11 du 25 du/ac 11 du 6. Glenbrooks (517 units existing) High 20 du/ac** 93 du additional 20 du/ac** 93 du additional 20 du/ac** 93 du additional 20 du/ac** 93 du additional Total Units on Recommended Sites 207 du 1,386 du 1,386 du 2,062 du 858 Note: * Separate parcels on a Housing Element site shall be combined, master planned and developed under a Master Developer. ** Indicates that site will not meet affordability criteria at Realistic capacity (85% of max.) TABLE 3 (contd.) Priority No. Site Name Priority (meets criteria) Density and Realistic Capacity (85% of max. density) Alternative A Balanced Plan (Recommended) Alternative B Alternative C Alternate Housing Element Sites 7. Marina Plaza Mod. 25 du/ac 145 du 35 du/ac 204 du 35 du/ac 204 du 40 du/ac 232 du 8. Stevens Creek Office Mod. 25 du/ac 134 35 du/ac 187 du 35 du/ac 187 du 40 du/ac 214 du 9. Cypress @ Finch Ave. Mod. 25 du/ac 105 du 25 du/ac 105 du 25 du/ac 105 du 25 du/ac 105 du 10. Shan, Q Mart, Dance Studio Low- Mod. 25 du/ac 36 du 25 du/ac 36 du 25 du/ac 36 du 25 du/ac 36 du 11. Loree Center Low- Mod. 25 du/ac 27 du 25 du/ac 27 du 25 du/ac 27 du 25 du/ac 27 du 12. Homestead Lanes+ Adj. Low- Mod. 35 du/ac 0 35 du/ac 151 du 35 du/ac 151 du 35 du/ac 151 du 13. Summerwinds & Granite Rock Low- Mod. 25 du/ac 96 du 25 du/ac 96 du 25 du/ac 96 du 40 du/ac 154 du Total Units on Alternate Sites 543 du 806 du 806 du 919 du Sites Recommended for Removal 14. Villages (468 units existing) Low 20 du/ac** 62 du 20 du/ac** 62 du 20 du/ac** 62 du 20 du/ac** 62 du 15. Arya/ Scandinavian Low 25 du/ac 58 du 25 du/ac 58 du 25 du/ac 58 du 25 du/ac 58 du 16. Foothill/ McClellan Low 15 du/ac* 0 25 du/ac 27 15 du/ac* 0 du 25 du/ac 27 17. Bateh Bros. Low 15 du/ac* 0 du 25 du/ac 14 du 15 du/ac* 0 du 35 du 19 du/ac 18. Carl Berg Low 25 du/ac 169 du 25 du/ac 169 du 25 du/ac 169 du 25 du/ac 169 du Total Units on Removed Sites 289 du 330 du (Remove) 289 du 335 du Total Units on All Sites 1,039 du 2,522 du (2,192 du not incl. Low priority) 2,481 du 3,316 du 859 The list of recommended Housing Element sites has been added to the Draft Housing Element. Should sites different from the Balanced Plan be recommended, these will be incorporated in the Draft Housing Element prior to forwarding to the HCD. In addition, the alternative Housing Element sites list will be maintained, in case, one or more of the sites are not approved by HCD after discussions with them. If the Final 2014-2022 Housing Element has to be replaced with sites from the Alternate Housing Element Sites list, any necessary amendments to the General Plan Land Use designations and zoning will be presented with the Final 2014-2022 Housing Element in Spring 2015. General Plan and Zoning Approach for Housing Element sites General Plan Land Use Designation – The General Plan Land Use Map will identify the base land use standards recommended in the Balanced Plan. Housing Element sites will have an overlay with the higher densities and height standards on the General Plan Land Use map. The development standards will be effective per the zoning schedule described below. Recommended Housing Element sites that require a change to the General Plan Land Use Designation include: the Hamptons, and the Oaks. Zoning Map Amendment – The Zoning Map amendments are scheduled to go into effect on April 30, 2015 (including the 30-day period, this represents the final date for adoption of a Housing Element per HCD) or the date the Final Housing Element gets adopted by the City, whichever occurs first. If changes are needed to the Housing Element sites list based on HCD review, the revisions to the Zoning Map will be presented concurrent with the adoption of the Final 2014- 2022 Housing Element in Spring 2015. Recommended Housing Element sites that would require a zoning change to add residential use include: the Oaks, and Vallco Shopping District. The Hamptons will require a rezoning from P(Res)-70 (unclear how this differs from Planned Residential) to P(Res) or Planned Residential. Key Question 5: Housing Element Sites a. Does the Planning Commission agree on the Housing Element sites list and densities? b. Does the Planning Commission agree on the Alternative Sites List and priority? SUMMARY OF AMENDMENTS A summary of General Plan Land Use and Zoning designations and Municipal Code text amendments is provided in Attachment 14. The attached resolutions (Attachments 2, 4, 5 and 6) provide additional details on the changes to General Plan Land Use, Zoning designation, the Municipal text and Specific Plan Amendments. A redlined version of the zoning text amendments is provided in Attachment 15. A redlined version of the Specific Plan text amendments is provided in Attachment 16. ENVIRONMENTAL IMPACT REPORT (EIR) The California Environmental Quality Act (CEQA) requires that all State and local governments consider the physical changes that result as a consequence of projects over which they have discretionary authority. The purpose of the EIR is not to recommend approval or denial of a 860 project but to provide information to be used in the planning and decision-making process. CEQA requires decision makers to balance the benefits of a proposed project against the environmental effects, along with other factors. The attached Planning Commission Study Session staff report (Attachment 17) and City Council Study Session staff report (Attachment 18) provides a detailed discussion on the EIR. A brief discussion of the issues is provided below. Proposed Project Alternative C was identified as the “CEQA” project because it was the one with the greatest development potential and therefore, the possibility of the greatest environmental effects. CEQA requires that alternatives to the Proposed Project should mitigate one or more impacts of the project. A discussion of Alternative C has already been provided earlier in this report. EIR Alternatives CEQA requires the analysis of a range of reasonable alternatives to a proposed project that would feasibly attain most of the project's basic objectives and avoid or substantially lessen any of the significant effects of the project. As noted earlier, the following alternatives were studied.  No Project Alternative - The CEQA-required No Project alternative assumes that the Draft General Plan would not be adopted or implemented and assumes the full implementation (by 2040) of development envisioned under the 2005 General Plan.  Alternative A – Discussion provided earlier in this report.  Alternative B – Discussion provided earlier in this report. Impacts The following environmental topics are addressed in the EIR. The EIR and the Planning Commission and City Council staff reports on the EIR study sessions discuss the impacts related to the CEQA Project (Alternative C) and the other alternatives in detail. Table 4 below outlines the impact in each environmental topic for the Proposed Project and alternatives. TABLE 4 Topic Proposed Project (Alternative C) No Project Alternative A Alternative B Aesthetics LTS LTS LTS LTS Air Quality SU SU SU SU Biological Resources LTS/M LTS/M LTS/M LTS/M Cultural Resources LTS LTS LTS LTS Geology, Soils & Mineral Resources LTS LTS LTS LTS GHG Emissions LTS LTS LTS LTS Hazards & Hazardous Materials LTS/M LTS/M LTS/M LTS/M Hydrology & Water Quality LTS LTS LTS LTS Land Use & Planning LTS LTS LTS LTS Noise SU SU SU SU 861 TABLE 4 Topic Proposed Project (Alternative C) No Project Alternative A Alternative B Population & Housing LTS LTS LTS LTS Public Services & Recreation LTS LTS LTS LTS Transportation & Traffic SU SU SU SU Utilities & Infrastructure LTS/M LTS/M LTS/M LTS/M Notes: LTS - Less-than-significant impact; LTS/M - Less-than-significant with mitigation; SU - Significant and unavoidable As noted above, the level of impacts in the Proposed Project as well as all three alternatives analyzed show the same level of impacts in each category, but in varying degrees. This is partly due to the fact that the EIR studied cumulative impacts of the buildout of the Proposed Project and alternatives over a 25-year period as well as the regional build-out plans. The results indicate that the difference between the impacts of the various alternatives is not very significant, when compared to the cumulative impacts of regional plans over a 25-year period. In general, the EIR finds significant and unavoidable impacts to Noise, Air Quality and Transportation and Traffic related to the Proposed Project and alternatives. In some cases, the significant impacts have been determined to be significant and unavoidable because the mitigation measures require approval from a governmental agency other than the City of Cupertino (e.g. Caltrans) and are not within the responsibility and jurisdiction of the City and needs approval from the other agencies through implementation. In other cases, a significant impact is unavoidable because the significant impact would not be fully mitigated even though mitigation measures have been identified. Draft EIR and Final EIR The Draft EIR was released on June 18, 2014 and was circulated for 45 days until August 1, 2014. A meeting was held on June 24, 2014 to solicit written comments from the public related to the EIR. Responses to comments received during the 45-day public review period were included in the Responses to comments (RTC) document published as part of the Final EIR on August 28, 2014. The Final EIR comprises of the Draft EIR (Attachment 19), the Response to Comments (RTC) Document (Attachment 20), and the Supplemental Text Revisions Memo dated October 8, 2014 (Attachment 21). The RTC document has to be made available to all agencies that commented for at least 10 days before final action is taken, per CEQA requirements. The City meets this obligation since final action on the project will not take place until November 2014. Comments were also received after the close of the EIR public review period on August 1, 2014. While CEQA does not require that the City respond to the comments received after the close of the public review period, staff has been and will continue to provide responses to these comments. As of October 7, 2014, 11 late comment letters were received. Responses to these comments have been compiled in a late comment memo (Attachment 22.) The comment letters 862 received during and after the close of the comment period did not concern new or substantially more severe significant impacts, mitigation measures, or project alternatives, or change the findings of the Draft EIR. The Planning Commission and City Council held EIR study sessions on September 9, 2014 and October 7, 2014, respectively. The study sessions were a forum for questions related to the EIR and no decisions were made. The Environmental Review Committee reviewed the EIR at its meeting on October 2, 2014, determined that it was adequate, and recommended that the City Council certify the Final EIR (Attachment 23). Balanced Plan (Recommended) The Development Allocation recommendations in the Balanced Plan are generally between Alternatives B and C. However the recommended heights are similar to or lower than those studied in Alternative B. The Balanced Plan provides a better balance of land uses than the Proposed Project or any of the other alternatives due to the fact that the (office/commercial to residential) balance is better than that in Alternative B, which had the lowest VMT of all of the alternatives studied in the EIR. However, it will continue to have significant avoidable impacts for traffic, air quality and noise even after incorporation of all feasible mitigation measures. Statement of Overriding Considerations for Recommended Project CEQA requires the decision-making agency to balance the economic, legal, social, technological or other benefits of a project against its unavoidable risks when determining whether to approve a project. If the specific economic, legal, social, technological or other benefits of the project outweigh the unavoidable adverse environmental effects, those effects may be considered acceptable and significant unavoidable impacts are outweighed by the proposed project's benefits. CEQA requires the agency to support, in writing, the specific reasons for considering a project acceptable when significant impacts are not avoided or substantially lessened. The Balanced Plan (Community Vision 2040) would result in significant unavoidable impacts related to transportation, air quality and noise, even after incorporation of all feasible mitigation measures. However, it would achieve community goals related to a balance of land uses, providing active and vibrant shopping and entertainment destinations, and economic and fiscal stability. In addition, the Plan would help ensure that regional targets for greenhouse gas emissions and housing are met and would focus growth in major transportation corridors, while maintaining community goals of neighborhood preservation and connectivity. These significant unavoidable impacts and project benefits are discussed in the CEQA Findings and Statement of Overriding Considerations (Attachment 1). PUBLIC NOTICING AND WORKSHOPS Noticing for the General Plan and Housing Element project has been extensive, including the following:  Three postcards sent to every postal address in the City 863 o One for General Plan Amendment o One combined for General Plan Amendment and Housing Element o One announcing availability of the Draft EIR  Newspaper notices  Notices sent to prospective housing element site property owners  Creation of a project website - notice of website updates and Workshop/meeting reminders e-mailed to over 300 website subscribers The following is a list of meetings.  General Plan Amendment Community Workshop #1 – July 18, 2013  General Plan Amendment Community Workshop #2 – October 23, 2013  General Plan Amendment Neighborhood Meeting – December 5, 2013  Chamber of Commerce and Block Leader meetings – January 29, 2014  Meetings with Study Area property owners/representatives  Meetings with interested Housing Element site property owners/representatives  Chamber of Commerce Legislative Action Committee –December 6, 2013 & February 7, 2014  Commission Meetings, Open Houses, Meetings and Study Sessions o City Council Meeting for the initiation of the General Plan amendment project & contract – February 19, 2012 and March 5, 2012 o City Council Meeting for initiation of the Housing Element project, consultant selection and contract – November 4, 2013 o Presentation at Teen Commission Meeting – October 2, 2013 o Presentation at Bike and Ped. Commission Meeting – January 15, 2014 o Joint Housing Commission and Planning Commission Presentation and Community Workshop for Housing Element sites #1 – January 23, 2014 o Housing Commission Study Session and Community Workshop for Housing Element sites #2 – February 12, 2014 o Open Houses #1 and #2 – February 19, 2014 and September 16, 2014 o Planning Commission Study Session on Housing Sites for environmental review – February 19, 2014 o City Council Study Session on Housing Sites and land use alternatives for environmental review – March 3, 2014 o Housing Commission meeting on housing policy – March 19, 2014 o Joint Planning Commission/City Council meeting on housing and draft General Plan policy direction – April 1, 2014 o Public meeting for EIR – June 24, 2014 o Housing Commission Meeting – August 28, 2014 o Planning Commission Study Session on the EIR – September 9, 2014 o City Council Study Session on the EIR – October 7, 2014 Public Comments Comments related to the Draft EIR have been discussed earlier in this report. In addition to comments received regarding the adequacy of the EIR, several comments were received on the project. The comments are briefly discussed in Attachment 24. 864 NEXT STEPS The Planning Commission’s recommendation will be forwarded to the City Council on November 3, 2014 for certification of the EIR, adoption of the General Plan (Community Vision 2040) and authorization to forward the Draft Housing Element to HCD and use the prioritized alternative Housing Element sites list. A second reading for the zoning ordinances related to the General Plan and Housing Element is scheduled for November 18, 2014. The Community Vision 2040 General Plan and Heart of the City Specific Plan Amendment will go into effect upon adoption, however, the zoning ordinance text and map amendments will go into effect 30 days after the November 18, 2014 second reading. The final General Plan document text, maps and graphics will then be formatted and prepared for posting by staff and the consultant. The Draft Housing Element will be forwarded to the State Department of Housing and Community Development (HCD) for their review, which is expected to take about 60 days. Staff will discuss outstanding items with HCD and discuss any necessary changes related to the Housing Element sites based on the prioritized list. Upon conclusion of HCD review, staff will present the Final 2014-20122 Housing Element for adoption to the Planning Commission and City Council. Any related General Plan amendments or Zoning map or code amendments related to the revised Housing Element sites list will be brought at the same time. State law requires agencies to adopt their 2014-2022 Housing Elements by May 31, 2015. ____________________________________________________________________________ Prepared by: Piu Ghosh, Senior Planner Reviewed by: Gary Chao, Assistant Director of Community Development Approved for Submission by: Aarti Shrivastava, Assistant City Manager Attachments: 1. Draft Resolution 6760, Recommending Certification of an Environmental Impact Report, adoption of Findings and a Statement of Overriding Considerations, and adoption of Mitigation Measures and a Mitigation Monitoring and Reporting Program, (EA-2013-03) 2. Draft Resolution 6761 adopting General Plan and Land Use Map Amendments (GPA-2013- 01) 3. Draft Resolution 6762 to authorize staff to forward the Draft 2014-2022 Housing Element to the State Department of Housing and Community Development (HCD) and use the prioritized list of Alternative Housing Element sites (GPA-2013-02) 4. Draft Resolution 6763 to approve Zoning Map Amendments (Z-2013-03) 5. Draft Resolution 6764 to approve Municipal Code Amendments (MCA-2014-01) 6. Draft Resolution 6765 to approve Specific Plan Amendment (SPA-2014-01) 7. General Plan Amendment and Housing Element staff reports for: February 12, 2014 Housing Commission, February 19, 2014 Planning Commission, March 4, 2014 City Council, April 1, 2014 Joint Planning Commission/City Council 8. Concept Alternative Maps 865 9. Market Study dated February 13, 2014 prepared by BAE Urban Economics 10. Retail Strategy Report dated March 6, 2014 prepared by Greensfelder Commercial Real Estate LLC 11. 2007-2014 Housing Element and Technical Appendix 12. Housing Commission staff report dated August 28, 2014 13. Site Priority List with criteria 14. Summary Of Land Use Map, Zoning Map And Zoning Text Amendments 15. Zoning Text amendments – Redlined version 16. Heart of the City Specific Plan amendment – Redlines 17. Planning Commission Study Session Staff Report dated September 9, 2014 18. City Council Study Session Staff Report dated October 7, 2014 19. Draft Environmental Impact Report dated June 18, 2014 20. Response to Comments Document dated August 28, 2014 21. Supplemental Text Changes Memo dated October 8, 2014 22. Updated Late Comments memo dated October 8, 2014 23. Recommendation of the Environmental Review Committee 24. Reponses to Public Comments Related to the General Plan and Housing Element 866 HOUSING COMMISSION STAFF REPORT Agenda Item No. 1 Agenda Date: February 12, 2014 SUBJECT: 2015-2023 Housing Element Update—Sites Identification RECOMMENDATION: Staff recommends that the Housing Commission accept the report on potential Housing Element sites, host a community workshop to discuss housing site identification criteria and sites, and reconvene to provide direction to staff on priority housing sites. BACKGROUND: Housing Element Overview The Housing Element is one of seven mandatory elements of the General Plan. The Housing Element specifies ways in which housing needs of existing and future resident populations can be met, and provides a comprehensive strategy for maintaining and expanding the City’s housing supply available to all economic segments in the community, including very low, low, moderate and higher incomes. Housing Element law requires that all jurisdictions facilitate housing development by creating policies and adopting land use plans and regulatory schemes that provide opportunities for housing development. State law requires that each city and county update its Housing Element on a pre- determined cycle; for this cycle, Housing Element updates must be adopted by January 31, 2015 (plus a 120-day grace period). If this adoption deadline is met, the planning period for this cycle extends from adoption to January 31, 2023 (or eight years). Otherwise, the City must update the Housing Element again in 2019 (every four years). As required by the California legislature and codified in the Government Code, Housing Elements must include specific analysis and must meet statutory requirements regarding contents. State law mandates that all Housing Elements must: 1) identify and analyze existing and projected housing needs, 2) discuss constraints to housing development, and 3) identify resources to meet housing needs (including identification of adequate sites to accommodate housing needs of all economic segments of the community). The Housing COMMUNITY DEVELOPMENT DEPARTMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3308 • FAX (408) 777-3333 867 Page 2 Housing Commission Housing Element Study Session February 12, 2014 Element must include a statement of goals, policies, quantified objectives, and scheduled programs for the preservation, improvement, and development of housing. The California Department of Housing and Community Development (HCD) is responsible for reviewing Housing Elements to determine compliance with Housing Element law. HCD also is the responsible body for establishing the statewide the quantified objectives for regional housing needs—the Regional Housing Needs Allocation (“RHNA”). Regional Housing Needs Allocation (RHNA) The RHNA is an estimate of projected needed housing units throughout the State and is based on Department of Finance population projections and regional population forecasts. The RHNA estimates are also correlated with long-term regional transportation plans. HCD allocates the RHNA to each region. In the Bay Area, the Association of Bay Area Governments (ABAG), the regional planning agency, is tasked with the responsibility of developing a regional housing plan—with a RHNA for each jurisdiction—to meet existing and future housing needs. The RHNA identifies Cupertino’s regional housing needs by income levels. The income levels are separated into four categories: very low, low, moderate, and above moderate. The City’s housing needs allocation for the period of 2015-2023 is 1,064 new housing units. The City is not obligated to construct the housing units identified by the RHNA. Rather, the City’s responsibility is to demonstrate adequate capacity, by identifying specific sites, to satisfy the RHNA under existing zoning and land use policy. Income Group RHNA Very Low 356 Low 207 Moderate 231 Above Moderate 270 Total 1,064 HCD generally requires jurisdictions to show a surplus of sites/units in order to guarantee that the City could realistically accommodate the RHNA allocations. DISCUSSION: Housing Element Sites Criteria HCD Criteria HCD reviews each Housing Element’s sites inventory to determine if adequate sites have been identified to meet the RHNA. Preparation of a “site suitability analysis” is an important step in addressing the adequate sites requirement. This analysis must 868 Page 3 Housing Commission Housing Element Study Session February 12, 2014 demonstrate that identified sites can accommodate the housing needs—by income level— within the planning period of the element (2015-2023). While the site suitability review has a degree of subjectivity, HCD review primarily focuses on the following criteria in determining the likelihood that a developed site will be converted to some form of housing over the planning period: existing use on the site, realistic potential for recycling, site size and ownership patterns, and development density. 1. Existing Use on the Site. HCD generally does not consider the following types of sites good candidates for private residential development:  Sites with existing multi-family housing developments consisting of 10 or more units, due to the potential loss of existing investment and revenue stream to the owner, unless the owner indicates his/her interest in redeveloping the site with additional residential uses.  Sites with condominium developments, since they typically have complicated ownership patterns and a developer would have to reach sales agreements with multiple owners.  Well-established organizations and institutions because of the difficulty such organizations and institutions would face relocating to locations, unless the owner indicates his/her interest in redeveloping the site with residential uses. HCD requires a more detailed analysis of redevelopment potential on sites with the above types of uses. However, where adjacent vacant space is available and existing uses would not be removed, HCD does not generally consider the existing use on the site a cause for concern. 2. Realistic Potential for Recycling. HCD evaluates the feasibility of redevelopment based on a variety of factors, some of which include property owner interest in redevelopment with housing, market factors related to location or site characteristics, existing uses on the site that are highly valued and anticipated to remain, the condition and age of existing development on the site, and environmental liability risks, such as land contamination. 3. Site Size and Ownership Patterns. HCD believes that larger sites provide the opportunity to increase capacity potential and to provide flexibility with regard to design, public amenities, mix of housing types, and mixed use development. It also believes that lot consolidation potential of parcels can be a factor in determining site suitability. Lot consolidation potential can be based on ownership patterns (single, limited, or multiple owners), history of lot consolidation in the area, and specific knowledge of owner interest in lot consolidation. Where lot consolidation potential is likely, the time and cost associated with development is reduced and thus the likelihood of redevelopment is increased. 869 Page 4 Housing Commission Housing Element Study Session February 12, 2014 4. Development Density. HCD has identified a density of 20 units per acre as adequate to encourage the development of affordable housing in Santa Clara County due to economies of scale that a developer can achieve. Sites that permit a density of less than 20 units per acre would not be considered as appropriate for fulfilling the lower-income RHNA requirement but could be appropriate for fulfilling the moderate and above moderate income RHNA requirement. In addition, HCD also evaluates the realistic yield for each site proposed to be on the Housing Sites Inventory. In Cupertino, HCD has accepted a realistic yield of 85% of the maximum density allowed on the site, based on city-specific historic project approval data. This means that for a one acre site, the maximum yield at a density of 25 dwelling units per acre is 25 units. However, the realistic yield for Housing Element purposes is (25 * 85%) = 21 units. Other Secondary Criteria (Sustainable Communities Strategy/One Bay Area Plan and Cupertino General Plan) In addition to the State-wide criteria that HCD uses to determine site suitability, the Sustainable Communities Strategy/One Bay Area Plan contribute additional criteria regarding what makes a desirable housing site in the ABAG region. The One Bay Area Plan is a long-range integrated transportation and land-use/housing strategy through 2040 for the San Francisco Bay Area. The Plan was jointly approved by the Association of Bay Area Governments (ABAG) and by the Metropolitan Transportation Commission (MTC) in 2013. ABAG determined the City’s and other local jurisdiction’s RHNA based on the Plan. Pursuant to SB375, the Plan includes the region’s Sustainable Communities Strategy and the 2040 Regional Transportation Plan. The Plan focuses development in Priority Development Areas (PDA). PDA’s are locally designated areas within existing communities that have been identified and approved by local cities or counties for future growth. These areas are typically accessible to public transit, jobs, recreation, shopping and other services and absorb much of the growth anticipated in the region. In Cupertino, the Priority Development Areas are located along Stevens Creek Boulevard between Highway 85 and the City of Santa Clara and along De Anza Boulevard between Stevens Creek Boulevard and Highway 280 (see Attachment HC-1 – VTA PDA Map) The City’s General Plan policies are generally consistent with the strategies in the One Bay Area Plan. Key themes include: 1. Location along major transportation routes with access to transit or within ½ mile of a VTA Priority Development Area (PDA) 2. Proximity to employment and activity centers 3. Proximity to amenities 4. Corner lot(s) preferred – such parcels provide the most flexibility to accommodate mixed-use developments and avoid impeding parking and connectivity between mid-block parcels. 870 Page 5 Housing Commission Housing Element Study Session February 12, 2014 Potential Housing Element Sites Consideration of Housing Element sites is still in the preliminary stages. No decisions regarding rezoning, density increases, or inclusion in the Housing Element has yet been made. Through this study session, the City will continue to discuss sites with the public. Additional sites may be identified via public input and Commissioner discussion. While several sites are discussed in the report, the City is only obligated to pick sites enough to cumulatively add up to 1,064 units. The cumulative total of the realistic yield of all the sites listed below, at the maximum densities proposed, is 5,426. A map has been prepared (see Attachment HC-2) which identifies all the sites discussed below. Existing Housing Element sites: The 2007-2014 Housing Element identified 13 sites (See Table 1 below.) Of these, four sites have since been developed and three sites do not meet the criteria discussed previously and have been identified in the table below with strikethroughs. For specifics on these sites, please see Attachment HC-3 (Site Criteria). Table 1: Existing Housing Element Sites No Sites Address Size (acres) Max. Density (DU/gr. ac.) Current Land Use Designation Current Zoning 1. Furniture 2000 19875 Stevens Creek Blvd 1.78 25 Commercial/ Office/ Residential P(CG, Res) Yoshinoya 19855 Stevens Creek Blvd 0.24 25 Commercial/ Office/ Residential P(CG, Res) 2. I-Restaurant 20007 Stevens Creek Blvd 1.35 25 Commercial/ Office/ Residential P(CG, Res) 3. 7-11 site behind Bombay Oven 10073 Saich Way 0.77 25 Commercial/ Office/ Residential P(CG, Res) 4a. Grand Buffet/ Boas 20030 Stevens Creek Blvd 1.16 25 Commercial/ Office/ Residential P(CG, Res) Lackey Prop. (SCB & Blaney) 10071 S. Blaney Ave 0.37 25 Commercial/ Office/ Residential P(CG, Res) Lackey Prop. (SCB & Blaney) 10031 S. Blaney Ave 1.36 25 Commercial/ Office/ Residential P(CG, Res) 4b. Corner of SCB & Blaney 20010 Stevens Creek Blvd 0.47 25 Commercial/ Office/ Residential P(CG, Res) 5. Arya 19930 Stevens Creek Blvd 0.44 25 Commercial/ Office/ Residential P(CG, Res) 871 Page 6 Housing Commission Housing Element Study Session February 12, 2014 No Sites Address Size (acres) Max. Density (DU/gr. ac.) Current Land Use Designation Current Zoning Arya Parking Lot 19936 Stevens Creek Blvd 0.52 25 Commercial/ Office/ Residential P(CG, Res) 6. SD Furniture 19900 Stevens Creek Blvd 1.92 25 Commercial/ Office/ Residential P(CG, Res) 7. United Furniture 10025 E. Estates 0.92 25 Commercial/ Office/ Residential P(CG, Res) United Furniture 10075 E. Estates 0.53 25 Commercial/ Office/ Residential P(CG, Res) United Furniture 10075 E. Estates 0.86 25 Commercial/ Office/ Residential P(CG, Res) 8. Barry Swenson Site 19160 Stevens Creek Blvd 0.55 25 Commercial/ Office/ Residential P(CG, Res) 9. Loree Center 10029 Judy Ave 0.43 25 Commercial/ Office/ Residential P(CG, Res) Loree Center 19060 Stevens Creek Blvd 0.86 25 Commercial/ Office/ Residential P(CG, Res) 10. Morley Bros. 10500 Pruneridge 2.80 25 Industrial/ Residential P(MP, Res) Morley Bros. 10400 Pruneridge 5.69 25 Industrial/ Residential P(MP, Res) 11. Glenbrook Apt. 10160 Parkwood 11.62 20 Med/High Density (10-20) R3 Glenbrook Apt. 21297 Parkwood 19.72 20 Med/High Density (10-20) R3 12. The Villages Apt. 20800 Valley Green Dr. 5.35 20 Med/High Density (10-20) R3 The Villages Apt. 20975 Valley Green Dr. 5.49 20 Med/High Density (10-20) R3 The Villages Apt. 20990 Valley Green Dr. 6.78 20 Med/High Density (10-20) R3 The Villages Apt. 20800 Valley Green Dr. 2.69 20 Med/High Density (10-20) R3 The Villages Apt. 20875 Valley Green Dr. 6.79 20 Med/High Density (10-20) R3 13. Carl Berg property 20705 Valley Green Dr. 7.98 25 Office/ Industrial/ Commercial/ Residential P(CG, ML, Res) 872 Page 7 Housing Commission Housing Element Study Session February 12, 2014 Sites Proposed By Property Owners Several property owners have indicated interest in being considered to be added to the Housing Element Sites Inventory list. Table 2 below identifies the sites and the current and desired development potential. Sites are listed in alphabetical order and are not in any particular order of priority. Details about the site criteria are available in Attachment HC-3. Table 2: Sites Proposed By Property Owners Site Size (acres) Existing Density (DU/gr. ac.) Desired Density (DU/acre) Current Land Use Designation Current Zoning Current Use Bateh Brothers (S-W corner of Foothill Blvd & Stevens Creek Blvd) ±0.67 15 20 – 35 Commercial/ Residential P(CG) Convenience store Cupertino Village ±12 25 35 – 40 Commercial/ Residential P(CG, Res) Commercial strip mall Foothill Market (Stevens Canyon Rd at McClellan Rd) ±1.3 15 20 – 25 Commercial/ Residential P(CG) Commercial strip mall Marina Plaza ±4.35 25 25 – 40 Commercial/ Residential P(CG, Res) Commercial strip mall Market Place ±9.9 25 25 – 35 Commercial/ Residential P(CG, Res) Three newer & one aging commercial building Stevens Creek Office Center ±4.8 25 35 Commercial/ Residential P(CG, Res) Office buildings The Hamptons ±12 25 65-110 High density residential 20- 35 DU/gr ac P(Res) Apartment complex with 342 units Vallco Mall ±35 35 No change Commercial/ Residential P(Regional Shopping) Indoor Mall Wonderland Chinese School & 10921 Maxine Avenue ±1.83 None/ 1-5 20 – 25 Quasi-public/ Institutional & Low Density Residential BQ/R1-10 Pre-school/ After-school & Single family home Yamagami’s Nursery ±2.33 15 25 – 40 Commercial/ Office/ Residential P(CG, Res 5-15) Commercial strip mall and nursery 873 Page 8 Housing Commission Housing Element Study Session February 12, 2014 Sites Proposed By Workshop Participants In addition to the sites that have been proposed by property owners, participants at the January 23, 2014 workshop identified several other sites as having potential for residential development or redevelopment. These sites have been provided in Table 3 below. Sites are listed in alphabetical order and are not in any particular order of priority. Details about the site criteria are available in Attachment HC-3. Table 3: Sites Proposed By Workshop Participants Site Size (acres) Current Density (DU/gr. acre) Current Land Use Designation Current Zoning Current Use Comments 21731 Stevens Creek Blvd (Next to Post Office) 0.62 4.4 – 12 Neighborhood Commercial, Industrial and Residential P(CN, ML, Res 4.4-12) Strip mall Martial Arts school, dry cleaners and beauty salon 76 gas station and adjacent office building (10625 N. De Anza Blvd & 20545 Valley Green Ave) ±0.7 25 Commercial/ Residential P(CG, ML, Res) Gas station and office building Odd shaped site. Abundant Life Church (N. Stelling Road) ±3.8 25 Commercial/ Residential P(CG, Res) Church This site was considered as a Housing Element site in the 2007-2014 planning cycle. At that time the property owners had not expressed interest Caltrans (on Bubb Road) ±2.9 20 Industrial/ Residential ML-rc Service/ Corp. Yard This property owned by the State of CA is used as their Corp. Yard. Cupertino Crossroads ±14.7 25 Commercial/ Residential P(CG, Res) Shopping Center A portion of the site was recently redeveloped and the balance of the site is mostly tenanted with the exception of one or two tenant spaces. Cupertino Financial Center (NE corner of Wolfe and SCB) ±4.4 25 Commercial/ Residential P(CG, OP, Res) Office complex This site has recently been acquired by JP Morgan and has an office building. 874 Page 9 Housing Commission Housing Element Study Session February 12, 2014 Site Size (acres) Current Density (DU/gr. acre) Current Land Use Designation Current Zoning Current Use Comments Cypress Hotel ±1.3 25 Commercial/ Residential P(CG, Res) Hotel Site is developed with a hotel that has property lines contiguous with its footprint. Evulich Ct @ Linda Vista Dr ±2.5 5 Low Density Residential R1-7.5 Single Family Older homes on underdeveloped lots Good Samaritan Church (Homestead Rd) ±1.36 25 Quasi-public/ Institutional BQ Church Existing Church Homestead Lanes and adjacent sites (20990, 20956 & 20916 Homestead) ±4.6 35 Commercial/ Residential P(Rec, Enter) & P(CG) Bowling alley & adjacent strip malls Older shopping center Homestead Road (21020, 21040, 21060, 21070 Homestead and APN: 326 07 036 and 326 07 033) ±5.4 15 Commercial/ Residential P(CG) Office buildings, parking lot and tennis courts May be an appropriate multi-family housing site at a higher density. Main Street (East of Finch Ave) ±11.5 25 Commercial/ Residential P(CG, OP, Res) Mixed use with hotel, commercial and office Site is currently under construction pursuant to entitlements that the property owner received in 2012. Oaks Shopping Center ±7.9 25 Commercial/ Residential P(CG, Res) Strip mall and theater Site has entitlements for a mixed use office building and hotel which expires in Sept. 2014. PG&E Service Yard (N. Blaney Ave) ±21.6 N/A Quasi-public/ Institutional BQ Corp. Yard PG&E has not expressed interest in redevelopment of site PG&E lower Substation (CA Oak Way) ±10.6 N/A Quasi-public/ Institutional A Power Substation PG&E has not expressed interest in redevelopment of site Portal Plaza (Between Portal & Perimeter) ±5.22 25 Commercial/ Residential P(CG, Res) Strip mall Shopping Center. Minimal vacancy at this site. 875 Page 10 Housing Commission Housing Element Study Session February 12, 2014 Site Size (acres) Current Density (DU/gr. acre) Current Land Use Designation Current Zoning Current Use Comments Post Office site ±5.2 4.4 – 12 Neighborhood Commercial, Industrial and Residential P(CN, ML, Res 4.4-12) Post Office This site is owned by the US Postal Service. St. Joseph’s Place (Café Torre site) ±2.2 25 Commercial/ Residential P(CG, Res) Strip mall Older shopping center Union Church of Cupertino (Stevens Creek Blvd) ±3 25 Commercial/ Residential P(CG, Res) Church, Pre-school Existing Church with historic designation. This site has recently added an annex building to increase services at the site. Village Green Apartments ±7.5 16 High Density Multi-family residential (20- 35 DU/gross acre) R3 Existing apartment complex with 122 units Based on R3 zoning, maximum yield is 161 units. For HCD’s purposes, realistic yield is 137 units. Therefore, this property has the potential to add 16 more units. Very low yield. Open space availability needs to be studied. Vivi’s Falafel (21771 Stevens Creek Blvd/ Next to Post Office) 0.44 4.4 – 12 Neighborhood Commercial, Industrial and Residential P(CN, ML, Res 4.4-12) Strip mall Restaurant and shoe repair store. PUBLIC NOTICING & OUTREACH Stakeholder Interviews Stakeholder interviews were conducted on December 11 & 12, 2013 to solicit input from stakeholders ranging from community members, property owners, housing developers, service providers, School Districts and the business community. A summary of common themes from the interviews is attached as Attachment HC-4. Summary of January 23 Joint PC/HC Workshop On January 23, the Planning Commission and Housing Commission hosted a joint workshop to begin the Housing Element Sites discussion. Eleven participants broke into small groups and identified potential future sites for housing and criteria for increased 876 Page 11 Housing Commission Housing Element Study Session February 12, 2014 density in certain areas including community benefits. Participants drew on maps and placed stickers to identify potential housing sites. See Attachment HC-5 for transcribed comments from the January 23rd small group discussions and Attachment HC-2 for a consolidated map of potential housing sites. The following table summarizes the noticing for this meeting: Notice Agenda  Email sent to all interested parties signed up through the project website  Letters sent to current Housing Element site property owners and interested property owners  Posted on the City's official notice bulletin board (one week prior to the hearing)  Posted on the City of Cupertino’s Web site (one week prior to the hearing)  Posted on the project Website (one week prior to hearing) CONCLUSION The goal for this study session is to review the sites that have been presented to date, identify any other new potential sites for consideration, to, potentially, rank the sites in order of preference with the understanding that sites must be chosen such that the cumulative yield of all the sites picked add up to a total of 1,064 units to make a recommendation to Planning Commission on priority housing sites that should be considered to meet the RHNA. Prepared by: MIG, Consultant to the City of Cupertino Piu Ghosh, AICP, Senior Planner Reviewed by: Approved by: /s/ Gary Chao /s/ Aarti Shrivastava Gary Chao Aarti Shrivastava City Planner Community Development Director Attachments HC-1. VTA PDA Map HC-2. Consolidated Sites Map – Potential 2015-2023 Housing Element Sites HC-3. Site Criteria Matrix HC-4. Common themes from Stakeholder interviews HC-5. Transcribed comments from January 23, 2014 meeting 877 PLANNING COMMISSION STAFF REPORT Agenda Item No. Agenda Date: February 19, 2014 SUBJECT: General Plan Amendment (GPA-2013-01) RECOMMENDATION: Staff recommends that the Planning Commission: a.Review the report on the GeneralPlan Amendment (GPA) Concept Alternatives to be studied in the EnvironmentalImpact Report (EIR) and provide comments. b.Discuss the land use alternatives to be considered for analysis in the EnvironmentalImpact Report (EIR) and provide direction. DESCRIPTION: Open House and Study Session toprovide an update on the focusedGeneral Plan Amendment GPA-2013-01) process and review land use alternatives to be considered for analysis in the EnvironmentalImpact Report (EIR). Proposed alternatives include options forCity-wide development allocations (office, commercial, hotel, andresidential), as well as building heights and densities for corridors, special centers, and seven study areas. BACKGROUND: Initial Council Direction At itsAugust 21, 2012 meeting, the City Councilauthorized staff to proceed with the initiation of a GeneralPlan Amendment (GPA) and directedstaff to present a scope of work for the GPA process, including: Theschedule for a specific and/or master plan for the Vallco Shopping District; A proposal to fund the GPA process; and A list of propertieswhere CG (General Commercial) zoning could be added. (See Attachment PC-1 for the staff report andmeeting minutes.) COMMUNITY DEVELOPMENT DEPARTMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 408) 777-3308 • FAX (408) 777-3333 17 2. 878 Page 2 PlanningCommission GPA OpenHouse and Study Session February 19, 2014 At the March 5, 2013 meeting, the City Council approved: The scopes of workfor theGPA, Vallco Shopping District Specific Plan, and associated EIR; Authorized the project budgetand consultant contracts; Provideddirection to staff to: Excludethe church site on Homestead and Stelling Roads as a study area; Include the PG&E site at Blaney Avenueand Homestead Road as a study area; and Review adding CG zoning and/or BA (Public Facility/School) uses to PG&E’s existing BQ (Quasi-Public Building) zoning. (See Attachment PC-2 for the staff report and meeting minutes.) GeneralPlan Amendment Overview The City’s current 2005 General Plan controlsthe amount of commercial, office, hotel, and residential built in the City through development allocations in terms of square feet commercial and office), rooms (hotel), and units (residential). Allocations are geographically assigned in certainneighborhoods, commercial centers, and employment centersso thatprivate development fulfills City goals and priorities, and reduces adverse impacts to the environment. A. Development Allocations: The primary purpose of the GPAis to replenish, re-allocate, and increase citywide office, commercial, hotel, andresidential allocations in order to plan for anticipated future development activitywhile keeping with the community’s character, goals, and objectives. B. ConsolidateReview Of Individual GPA Requests: The secondary purpose of the GPA is to consolidate development requests by several property owners for amendments to the General Plan. The communityvision developed as part of theGPA process will help evaluate the development requests along with the associated GeneralPlan amendments being requested. The consolidated General Plan amendment process also provides a unique opportunity for the community toprovide input on the various requests received at a citywide level, instead of a site-by-site basis, which only looksat a limited scope. In additionto the various property owner requests, at the March 2013 meeting, the City Council added the PG&E corporation yard site at Blaney Avenueand Homestead Road to the list of study areas to explorethe possibility of a commercial overlay. The seven project study areas and the General Plan amendments being requested by property owners are listedbelow: 1. Cupertino Inn and Goodyear Tire – Increased height and additional hotelallocation 2. City Center – Increased height and additional office allocation 3. PG&E site at Blaney Avenueand Homestead Road – Add commercial overlay 4. Mirapath (adjacent to PG&E site) – Add commercial overlay 18879 Page 3 PlanningCommission GPA OpenHouse and Study Session February 19, 2014 5. CupertinoVillage – Increased height and additional allocations for mixed-use 6. Vallco Shopping District – Increased height, land use changes, and additional allocations for mixed-use 7. Stevens Creek Office Center (Peet’s/Panera site) – Increased height and densities and additional allocations for mixed-use. C. Inform Vallco Shopping District Specific and/or Master Plan: The Vallco Shopping District contains a significantamount of existing commercial built area approximately 1.3 million square feet), andis one of the few major commercial areas in the City that has significant redevelopment potential. The community has also expressed great interest in seeing the mall revitalized. It isanticipated that theGPA process will help create a communityvision for the Vallco Shopping District that will guide the development of a new set of land use parameters and development objectives that would provide a framework to evaluate development requests and clear direction for itsfuture development. Priorto the City approving anysignificant developmentapplications in the Vallco Shopping District, a Specific and/or Master Plan will be required. Since the City Council’s authorization of the process, a developer has approached staff with an interest in redeveloping the entireVallco Shopping District, with theexception of the Rose Bowl parcel, the KCR-owned parcel behind JC Penney’s along I-280, andpossibly the Simeon-owned parcel behind the Macy’s garage along I-280. D. Update To Address State Law And Clean Up: Lastly, the GPA process will alsoaddressrecent State law requirements for General Plan Amendments, including the Global Warming Solutions Act (AB 32 – 2006), Sustainable Communitiesand Climate Protection Act (SB 375 – 2008), General Plans and Military Facilities (SB 1468 - 2002/SB 926 – 2004) , and the Complete Streets Act (AB 1358 - 2008). The GPA will include other administrative “clean-up”, including correcting erroneous zoning and densities, formalizing some existing City policies, andother language related to recent developments, such as the City’s Local Hazard Mitigation Plan. E. Municipal Code/Zoning Ordinance Clean Up: There may be also be additional “clean up” revisions to the Municipal Code, including such items as revising the definition of gross density to exclude adjacentstreet widths. Settings and Opportunities Report In September 2013, the City released a Settings and Opportunities reportthat provides an overview of the project, a summary of the current planning context in Cupertino, and a detailed analysis of existing land use, design, and mobility conditions for each of the seven project study areas (see Attachment PC-3). The report also includes an initial list of key findings of existing conditions and opportunities. 19880 Page 4 PlanningCommission GPA OpenHouse and Study Session February 19, 2014 Key opportunities include: 1. Exploring the possibility of creating a community benefits incentives program for development; 2. Identifying strategies for diversifying andstrengthening Cupertino’s local economy; improving multi-modalcirculation through the City; and 3. Identifying a viable, community-based strategy for revitalizing the current Vallco Mall and broader shopping district so that it remains a regional shopping destination. Market Study and Retail StrategyReport An analysis of the sales data for Cupertino’s retail trade area indicates that there are significant sales tax leakages in to areas outside the City. The community has indicated that thereis support for capture of the lost sales tax revenue. In order to determine the areas in which the City can capture some of the lost sales tax, a Market Study was prepared (See Attachment PC- 4). The purpose of the Market Studyis to assess market trendsanddemand for new commercial, office, hotel, andresidential development in Cupertino. The Market Study’s demand estimates that the existing ~701,500 square foot of commercial space available in the City’s General Plan Allocationpool is adequate to meet the high end of additional demand in the City through the year 2035. However, the study indicates market support for an additional 3.6 million net square feet for office space; 985 net hotel rooms; and 4,420 residential unitsthrough the year 2035. In addition, a Retail Strategy Report has been commissioned to review the estimates provided in the Market Study and provide recommendations on the retail viability of each of the seven study areas and alternative recommendations for revitalizing the Vallco Shopping District. Housing Element Updateand Recent Regional Planning Considerations The Alternatives presented in thisreport are also informedby theconcurrent Housing Element updateand by Regional Planning considerations such as the regional Sustainable Communities Strategy (SCS) called the OneBay Area Plan and transit plans such as VTA’s Bus RapidTransit. Housing Element Update In this study session, the Housing Element Update potential sites will be discussed in conjunction with the GPAalternative considerations. While no decisions regarding rezoning, density increases, or inclusion in the Housing Element has yet been made, some of the potential Housing Element sitesare from the GPA’s seven study areas, including Cupertino Village, Stevens Creek Office Center, and the Vallco Shopping District. The property owners of each of these andother sites proposed byproperty owners as Housing Element sites have proposed densities ranges higher than those allowed by the GeneralPlan. As a result of the Housing Element Update process, the Housing Element sites may be allowedhigher densities than what are normally allowed in their respective corridor/specialcenter. The densities for these sites 20881 Page 5 PlanningCommission GPA OpenHouse and Study Session February 19, 2014 have not been included in the General Plan Alternatives since the finallist of sites to be studied in the EIR have not beenselected at thistime. See the Housing Element Update staff report for more information. At that discussion, staff will look for direction from the Commission on the densities that will be studied. Once the Council reviews the Planning Commission’s recommendation and makes thedecision on the finallist of sites to be studied for each General Plan Alternative, they will be included in the EIR analysis. Plan Bay Area Plan Bay Areais a long-range integrated transportation and land-use/housing strategy through 2040 for the San Francisco Bay Area. The Plan was jointly approved by theAssociation of Bay Area Governments (ABAG) and by the Metropolitan Transportation Commission (MTC) in 2013. Pursuant to SB 375, the Plan includes the region’s Sustainable Communities Strategy and the 2040 Regional Transportation Plan. The Plan focuses development in Priority Development Areas (PDA). The forecastestimates in Plan Bay Area formed the basis of the Regional Housing Needs Assessment (RHNA) for jurisdictions in the Bay Area. This is discussed in further detail in the Housing Element Update staff report. PDA’s are locally designated areas within existingcommunities that have been identified and approved by local cities or counties for future growth. These areas are typically accessible to public transit, jobs, recreation, shopping andother services and absorb much of the growth anticipated in the region. In Cupertino, the PDA’s are located along Stevens Creek Boulevard between Highway 85 andthe border with the City of Santa Clara and along De Anza Boulevard between Stevens Creek Boulevard and Highway 280. Bus Rapid Transit (BRT) Santa Clara Valley Transit Authority (VTA), theSouth Bay’s regional transportation agency, is studying the possibility of creating a Bus RapidTransit (BRT) line along Stevens Creek Boulevard from De Anza College to the Transit Mallin downtown San Jose. The goal of this project is to address projected increased transit demandalong Stevens Creek Boulevard, which is currently the second highest ridership route in the VTA region. VTA is proposing to add BRT stations at De Anza College, Stelling Road, De Anza Boulevard andWolfe Road in Cupertino. Options being studied by the VTA include providing a dedicated route for the BRT in the center of Stevens Creek Boulevard, which would involve the removal of a driving lane in each direction, as well as, using the existing lanes in their current configuration for the bus line with reduced stops. While a new BRT line along Stevens Creek Boulevard would provide increased transitopportunities for residents and students at De Anza College, there was some community concernsexpressed about removing a driving lane in each direction along Stevens Creek Boulevard. Since BRT is a proposed regional project, the EIR analysis will include an optional analysis of the impact of BRT in Alternatives B andC. 21882 Page 6 PlanningCommission GPA OpenHouse and Study Session February 19, 2014 DISCUSSION: Concept Alternatives Three draft GeneralPlan Concept Alternatives have been prepared thatoutlinedifferent future scenarios (Attachment PC-5 – Concept Alternatives Report). The alternatives weredeveloped to reflect community input (workshops and online input) as well as to respond to regional economic growth factors andhousing needs. The alternatives range from minimal change to the current 2005 General Plan (Alternative A), to more moderate growth (Alternative B), to a greater change in development criteria which reflect the various property owners’ requests Alternative C). These changes in development intensity include changes to land uses, heights anddevelopment allocation. The alternatives specifically focus these changes on five major mixed-use corridors in the core of Cupertino – Homestead, North Wolfe, Heart of the City, North De Anza, and South De Anza. Major Mixed-Use Corridors Each of the alternatives A, B andC are organized by the mixed-use corridors in which allocation is distributed. Other Special Centers in the City remain the generally the same. The alternative maps (on pages 27, 29, and 31 of Attachment PC-5) identify the following five mixed-use corridors: A. Homestead The Homestead corridor consists of the area on the south side of Homestead Road between the City’s eastern boundary with the City of Sunnyvale (~1/4 mile east of N. Blaney Avenue) to the City’s western boundary with the City of Sunnyvale (~600 feet west of N. Stelling Road). It includesproperties on the north side of Homestead Road close to the intersection of De Anza Boulevard and Homestead Road bounded by the City’s northernboundary with Sunnyvale. This mixed-use corridor expands the boundaries of the existing Homestead Roadspecial center in the 2005 General Plan. B. North Wolfe The North Wolfe corridor includes propertieson the west side of N. Wolfe Road, bounded by I-280 to thesouth and Homestead Road to the north and includes the Hampton Apartments site at the NE corner of N. Wolfe Road and I-280. This area consists of a portion of the existingVallco Park North specialcenter in the 2005 General Plan, with theexclusion of the recently approved Apple Campus 2 project. 22883 Page 7 PlanningCommission GPA OpenHouse and Study Session February 19, 2014 C. Heart of the City The Heart of the City corridor consists of the area currently defined in the Heart of the City SpecificPlan, and includespropertiesalong Stevens Creek Boulevard between Highway 85 on thewest to the City’s eastern boundary near Lawrence Expressway and portions of De Anza Boulevard (up to Alves Driveto the north and Scofield Drive to the south) and Stelling Road. This area also consists of the existing Heart of the City, Vallco Park South, and City Center special centers defined in the 2005 General Plan. D. North De Anza The North De Anza corridor consists of the North De Anza Boulevard Special Center boundaries in the 2005 GeneralPlan, generally North De Anza Boulevard between Alves Drive to the south and I-280 to the north, including portions of Valley Green Drive, Mariani Avenue, Bandley Drive, and Lazaneo Drive west of De Anza Boulevard. E. SouthDe Anza The SouthDe Anza corridor consists of the South De Anza Boulevard Special Center boundaries in the 2005 GeneralPlan. South De Anza Boulevardboundedgenerally by Scofield Driveto the north and Bollinger Road to the south. This area also includes the portionof the city previously known as the South Saratoga-Sunnyvale Conceptual Plan area which islocated on the west side of S. De Anza Boulevard between Rainbow Drive and ProspectRoad. OtherExisting Special Centers The 2005 GeneralPlan Special Centers located outside the major mixed-use corridors will remain as partof this GPA. Theseareas include Monta Vista, Oak Valley, Fairgrove, Other Neighborhoods, Other Commercial Centers, and Bubb Road. With theexception of re-assigning allocations to replenish certaintypes of development potential in mixed-use areas (Monta Vista, Other Commercial Centers, and BubbRoad) and clarifying boundaries/names, there are no significant changes (particularly height and density) proposed. In addition, the non- geographically specific Major Employersallocation category will remain. Gateways, Sub-Areas, and Nodes Following input from the various stakeholders at community meetings, the following gateways, sub-areas and nodes have been identified. The purpose of identifying gateways, sub-areas, and nodes is to organize requests from applicants within the mixed-use corridors. Theseareas have been organized to reflect requests for increased residential density and/or heights based on locations near freeways or where they would not impact existing neighborhoods and would provideretail and project-wide or community-wide benefits. If development is proposed in areas that abut single-family residential development, the development is expected to maintain a setback to height ratioof 1:1. 23884 Page 8 PlanningCommission GPA OpenHouse and Study Session February 19, 2014 A. City Center Node The City Center Node (one of the seven study areas) is identified as being bound by Stevens Creek Blvdto the north; S. De Anza Blvd to the west; Rodrigues Avenue to the south; and TorreAvenue to the east. Due to the height of the existing buildings in this node, the input from community workshops ranged from not allowing any increased heights to allowing some increase in heights. B. North Crossroads Sub-Area The North Crossroads Sub-Area consists of the north side of Stevens Creek Blvd between N. De Anza Blvd and N. Stelling Road, with the exception of the Abundant Life Church site, since it abuts single-family residential uses. The North Crossroads Sub-Area includes the Stevens Creek Office Center study area. Input from the community workshopsnoted that this area isideal for active commercial space along Stevens Creek Boulevard, similarto the existing Peet’s and Panera developmentat the site. C. North De Anza Gateway North De Anza Gateway consists of the Cupertino Inn and Goodyear Tire study area sites at the northwest corner of the N. De Anza Blvd and I-280 intersection. These have been identified consistently at the community workshops as an area where some increased heights may be acceptable due to its proximity to the freewayand distance from single- family residential uses. D. North Vallco Gateway The North Vallco Gateway consists of the west side of N. Wolfe Road, bounded by I-280 to the southand Homestead Road to the north and the Hampton Apartments site at the NE corner of N. Wolfe Road and I-280. The width of thegatewayon the west side of N. Wolfe Road is proposedat approximately 275 feet wide (the width of the Duke of Edinburgh and Hilton Garden Inn sites fronting Wolfe Road). The North Vallco Gateway includes a portion of the CupertinoVillage study area. This has also been identified atthe community workshops as an area where some increased heights may be acceptable due to its proximity to the Apple Campus 2 currently under development and the freeway. E. South Vallco GatewayWest The South Vallco Gateway – West consists of the west side of N. Wolfe Road south of the I- 280 freeway. Thisis generally bounded by I-280 to the north; Perimeter Road to the west; and Stevens Creek Blvdto thesouth. The South Vallco Gateway East includes a portion of the Vallco Shopping District study area. Heights directly along Stevens Creek Boulevard and Wolfe Road are proposed to be increased to reflect a developer’s request as well as input from community workshops. Heights adjacent to single-family neighborhoods in this area are proposed to be lower than those directly along the major corridors. 24885 Page 9 PlanningCommission GPA OpenHouse and Study Session February 19, 2014 F. SouthVallco Gateway East The South Vallco Gateway – East consists of the east side of N. Wolfe Road south of the I- 280 freeway. Thisisgenerallybounded by I-280 to the north; Stevens Creek Blvd to the south; and Tantau Avenue to the east. This hasbeen identifiedby in community workshops as an area where increased heights may be acceptable if appropriate community benefits were provided, due toits proximity to the freeway and distance from existing neighborhoods. Therefore, heights reflect the workshop comments and a developer’s request. TheSouth Vallco Gateway East includes a portion of the Vallco Shopping District study area. G. Stelling Gateway The Stelling Gateway consists of thesouth side of Homestead Road, bounded by The Markham Apartments to the east; I-280 to the south; and the City’s boundary with Sunnyvale to the west (~600 feet west of N. Stelling Road). This areahas been identified at the community workshops as an area where some increased height and mixed-use, including residential development, may be appropriate. H. Stevens Creek and 85 Gateway Stevens Creek and 85 Gateway consists of the current Oaks Shopping Center site on the north side of Stevens Creek Blvd between Highway 85 and Mary Avenue. This has also been identified at the community workshops as an area where some increased height and mixed-use development may be appropriate due to the proximity to the freeway and distance from single-family neighborhoods. Alternatives A – C Each alternative is represented diagrammatically in Attachment PC-5 which showsthe boundaries for the five mixed-use corridors andincludes tables that summarize primary uses, maximum residential densities, maximum heights, and development allocation. Tables also summarize specificstandards for the eight different gateways, nodes, and sub-areas identified within the mixed-use corridors. While development allocationis divided by corridor, maximum residential density and building heights vary through each of the eight smaller areas. Allocation adjustments for the other existing Special Centers are identified. Alternative A Alternative A consists of the following themes: Maintain thepolicies of the 2005 General Plan Increase office and hotel development allocations Streamline GeneralPlan area boundaries Alternative A identifies how growth would occur if the City largely continuesthe policies of the current 2005 General Plan, while making minor developmentallocation and boundary changes. 25886 Page10 PlanningCommission GPA OpenHouse and Study Session February 19, 2014 Underthis alternative there are no changes to existing land use designations, height limits, development standards and densities (with the exception of SouthDe Anza – from 15 to 25 du/ac in order to be consistent with other corridors). Thisspecifically includesfocusing office allocation increases within the Heart of the City Corridor, which is the area that can absorb new officedevelopment under the framework of the 2005 GeneralPlan and as envisioned in the One Bay Area Plan adopted by ABAG and MTC in 2013. Under the land use standards in the 2005 General Plan, Vallco Shopping Mallwould remain the same underthis alternative because there is not enough allocation or economic incentive to redevelopthe site. Alternative A does not add additionalcitywide residentialallocation. However, it does re- allocate the existing allocation in order to address Housing Element requirements, with the particular goal to ensure that existing Housing Element sites are accommodated based on their realistic yield (85% of maximum allowable density). State law requires the City to identify land suitable to hold its regional fair share of housing for the 2014-2022 timeframe (known as the RHNA allocation). This alternative meets current RHNA requirements given that theresidential allocation (1,895 total) is above the current RHNA allocation of 1,064 units. However, this alternative does not include enough residential allocations to fully achieve the OneBay Area requirements for 2040 (discussed later under Alternatives B andC). Alternative B Alternative B is derived from the following themes: Focus new growth alongmajor mixed-use corridors Revise height standards at key nodes, gateways and sub areas alongmajor mixed-use corridors Increase office, hotelandresidential development allocations Support the redevelopment of the Vallco Shopping Districtby reallocating existing commercial allocation Streamline GeneralPlan area boundaries Alternative B identifies how the City can focus development along major mixed-use corridors in order to create morecomplete commercial, officeandentertainment areas, and to address mid- term housing needs. It increases development allocations at a level above Alternative A in order to bettercapture retail sales leakage and regionaldemand for officedevelopment. Heightsand residential densities in key nodes, gateways and sub areas reflect areas alongthe five mixed-use corridors where additional developmentallocation in the General Plan may be located. This alternative also provides guidance on where increased heights may be considered if a development meets certain criteria (e.g., includes a retail component, is away from residential neighborhoods or is near freeways) and provides project-wide benefits. Similar to Alternative A, it includes streamlining the current 2005 General Plan boundaries. This alternative includes a broader range of Complete Streets and transit improvements than those includedunder Alternative A which would better connect the major mixed-use corridors to surrounding residential neighborhoods through bicycle, pedestrian and intersection 26887 Page11 PlanningCommission GPA OpenHouse and Study Session February 19, 2014 improvements. Thisalternative also includes studying theproposed dedicated Bus Rapid Transit (BRT) line along Stevens Creek Boulevard, which connects De Anza College andmajor intersections in Cupertino to San Jose and the greater Bay Area. Similar to Alternative A, this alternative adds additional residentialallocation as partof the Housing Element update. However, it adds 1,421 new residential units to the current allocation of 1,895 units that will meet both the current RHNA requirements and 75 percent of the 2040 One Bay Arearequirement. Alternative C Alternative C is derived from the following themes and reflects the property owners’ requests: Support the redevelopment of the Vallco Shopping Districtby reallocating existing commercial allocation Revise density and height standards at key nodes, gateways and sub areas along major mixed-use corridors Increase office, hotel andresidential development allocations Streamline General Plan area boundaries Alternative C identifies a way to transform the Vallco Shopping Mall into a locally and regionally significant retail, employment, housingand entertainment destination, and account for a large portion of the City’s RHNA. Underthis alternative, the Vallco areabecomes the downtown” of Cupertino, serving the mixed-use hub for residents, workers and the larger region. Alternative C also includes streamlining the current 2005 General Plan boundaries, similarto Alternatives A and B. It also increases development allocations at a level above both Alternatives A and B in order to fully capture retail sales leakage and regional demand for officeand hotel development. Heights and densities in key nodes, gateways and sub-areas reflect areas along the five mixed-use corridors where City-wide developmentallocation in the GeneralPlan may be located. It also provides guidance on where increased heights may be considered if a development meets certain criteria (e.g., includes a retail component, is away from residential neighborhoods or is near freeways) and provides project-wide benefits. Similarto Alternative B, this alternative includes thebroader range of Complete Streets and transit improvements, such as bicycle, pedestrian and intersection improvements and an option to study the proposeddedicated Bus RapidTransit (BRT) along Stevens Creek Boulevard. Thisalternative also includes updating the Housing Element as required by State law and includes an option for an allocation of 4,421 units (2,526 units more than currently allocated in the General Plan), consistent with 2040 OneBay Area Plan projections. 27888 Page12 PlanningCommission GPA OpenHouse and Study Session February 19, 2014 Comparison of Existing Conditions and Alternatives A, B and C Please refer to Attachment PC-6 for a comparison of the different alternatives prepared above with the Existing 2005 GeneralPlan conditions with respect to allocations, heights, and densities. In addition, please refer to page 34 of the Concept Alternatives Report in Attachment PC-5 that shows how the different alternativesaffectthe GPA’s seven study areas. Purpose of the Concept Alternatives The purpose of the alternatives is to not to make determinations on the final General Plan concept. Instead, it is to allow the opportunity for a community-wide dialogue onheights, land uses and development allocations. The EIR will be program-level with enough detail to help future applicants expedite environmental review by tiering off the EIR with Mitigated Negative Declarations. Given that the development allocation system is dynamic and allocated to projects on a “first come, first serve” basis, allocations would be reserved for the seven study area stakeholders for five years after the conclusion of the GPA process. Environmental Review An Environmental Impact Report (EIR) is being prepared for this project. The preparation of the EIR will commence once the City Councilprovides its comments on the alternatives. The Council meeting is scheduled for March 4, 2014. The California Environmental Quality Act (CEQA) requires that alternatives to a project should be studied. These must avoid or substantially lessen at leastone of the significant impacts of the Proposed Project. The Proposed Project for the EIR being requested by the study area property owners is Alternative C. Alternatives A and B have been identified as alternatives to the project that will avoid or substantially lessen at least one of the significant impacts of the Proposed Project. Finally, CEQA requires the analysis of the No Project Alternative. The No Project Alternative assumes no change to the current GeneralPlan. The analysis for this alternative will include buildout of the current 2005 General Plan. Under this scenario, there are no changes to existing land use policies, height limits, land use designations, or any additional development allocation for office, commercial, hoteland residential units. The 30-day Notice of Preparation (NOP) period will commence soon after the March 4, 2014 City Council meeting with a scoping session scheduled for March 11, 2014. It isanticipated that preparation of the Draft EIR will take about four monthsand will be released for public review in Summer 2014. A community open house isplanned during the 45- day public review period. Following the close of the public reviewperiod, a Final EIR will be prepared. The recommendation from the Environmental Review Committee, public hearing for 28889 Page13 PlanningCommission GPA OpenHouse and Study Session February 19, 2014 thePlanning Commission and public hearing for the Council EIR review and certification are tentatively scheduled for Fall 2014. PUBLIC NOTICING & OUTREACH Project Website In June 2013, theproject website (www.cupertinogpa.org) was launched in order to collect and convey information related to the project. The website provides updates onupcoming events and recently released reports; provides background information on the process andexisting General Plan; allows users to submit comments and questions; and provides information onthe concurrent Housing Element Update project. Workshops, Public Meetings, Commission/Committee Meetings, andStakeholder Meetings Community-wide Workshop #1 (July 18, 2013) - On July 18, 2013, the City hosted a community-wide workshop to kick off the GPAproject. A citywide postcard announcing the workshop was sent to allCity addresses, and e-mails were sent to all stakeholders and other interestedparties. The City’s website andproject website also announcedthe workshop. Following a presentation, workshop participants were asked to discuss and participate in small group exercises which included a discussion of assets and mobility, urban design or economic challenges thatshould be addressed by the GPAand opportunities for future development. See Attachment PC-7 for a workshop summary, which contains a compilation of the assets, challenges, and opportunities identifiedby the workshop participants. Community-wide Workshop #2 (October 23, 2013) - On October 23, 2013, the City held a second Community-wide Workshop to discuss community ideas for future uses, design and mobility concepts along major mixed-use corridors (Homestead, De Anza, Wolfe, and Stevens Creek) and within the Vallco Shopping District. E-mails were sent to all study area stakeholders, Community-wide Workshop #1 participants, andother interested parties. The City’s website and project website also announced the workshop. Following a presentation, workshop participants were asked to participate in a Community Design Survey and Vallco Mapping Exercise. Public Meetings - The City held a NeighborhoodMeeting specifically for interested Cupertino residents on December 5, 2013, which covered the same concepts from Community-wide Workshop #2. The City held similar meetings for the Chamber of Commerce and CupertinoNeighborhood Block Leaders on January 29, 2014. Study Area Stakeholder Meetings – These include meetings with key neighborhood representatives, organizations (including the Chamber of Commerce and VTA), property owners in the study areas, etc. 29890 Page14 PlanningCommission GPA OpenHouse and Study Session February 19, 2014 See Attachment PC-8 for a summary of Workshop #2; themeetingon December 5, 2013; and meetings on January 29, 2014; which contains a compilation of the responses received for the survey andpictures of the Vallco exercise maps. Commissionand Committee Meetings City staff introduced the GPAproject before certain City Commissions and the Cupertino Chamber of Commerce’s Legislative Action Committee (LAC) in orderto expand awareness of the project, receivefeedback, and answerquestions. Staffpresented the project at the: October 2, 2013 Teen Commissionmeeting; December 6, 2013 and February 7, 2014 Legislative Action Committee meetings; and the January 15, 2014 Bicycle and Pedestrian Commissionmeeting February 19th Planning Commission Open House and Study Session The following tablesummarizes the noticing for this meeting: Notice Agenda Email sent to all study area stakeholders, prior workshop participants, and interested parties signed up through the project website Citywide postcard sent to all addresses in the City Posted on the City's official notice bulletin board (oneweek prior to the hearing) Posted on the City of Cupertino’s Web site one week prior to the hearing) Posted on the project Website (one week prior to hearing) NEXT STEPS The goal for this study session is to review the proposed land use alternatives, collect public input, and provide comments and recommendations for the City Council’s consideration at their similar study session on March 4, 2014. The following additional meetings have been scheduled: March 4, 2014: City Council Study Session on the GPAand Housing Element March 11, 2014: Environmental Scoping Meeting ontheGPA and Housing Element April 1, 2014: Joint City Council and Planning Commission Study Session on the GPAand Housing Element. This meeting will involve a discussion of policies to be included in the GPA. Prepared by: GeorgeSchroeder, Associate Planner Piu Ghosh, AICP, Senior Planner 30891 Page15 PlanningCommission GPA OpenHouse and Study Session February 19, 2014 Reviewed by: Approvedby: s/ Gary Chao /s/ Aarti Shrivastava Gary Chao Aarti Shrivastava Assistant Director ofCommunity Development Director of Community Development Attachments PC-1. August 21, 2012 City Council Staff Report andMeeting Minutes PC-2. March 5, 2013 City Council Staff Report and Meeting Minutes PC-3. Settings and Opportunities Report PC-4. Market Study PC-5. Concept Alternatives Report PC-6. Tables with Comparisons of Existing 2005 General Plan and Alternatives A, B, andC PC-7. Community Workshop #1 Summary PC-8. Mobility and Design Concepts Input Summary 31892 PLANNING COMMISSION STAFF REPORT Agenda Item No. ______ Agenda Date: February 19, 2014 Application No.: GPA-2013-02 Applicant: City of Cupertino Location/APN: Citywide SUBJECT: Study Session to reviewHousing Element requirements and sites to achieve theRegional Housing Needs Allocation (RHNA) for the upcoming 2014-2022 Housing Element RECOMMENDATION: Staff recommends that the Planning Commission: 1. Review the report on potential Housing Element sites and 2. Discuss potential housing sites and provide comments on the priority housing sites to be studied in the joint General Plan Amendment and Housing Element EnvironmentalImpact Report (EIR). BACKGROUND: Housing Element Overview In accordance with State law, California cities must have an adopted General Plan, which must contain a Housing Element. Housing Element law requires that all jurisdictions facilitate housing development by creatingpolicies and adopting land use plans and regulatory schemes that provide opportunities for housing development, including units that could accommodate households with very low, low, moderate and higher incomes. For information on Housing Elementcontent, please see Attachment PC-1. State law requires that each city and county update its Housing Element on a pre-determined cycle; for this cycle, Housing Element updates must be adopted by January 31, 2015 (plus a 120- day grace period). If this adoption deadline is met, the planningperiod for this cycle extends from adoption to January 31, 2023 (or eight years). Otherwise, the City must update the Housing Elementagain in 2019 (every four years). COMMUNITY DEVELOPMENT DEPARTMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 408) 777-3308 • FAX (408) 777-3333 478893 RegionalHousing Needs Allocation (RHNA) The RHNA is an estimate of projected needed housing unitsthroughout the State andis based on Department of Finance population projections andregional population forecasts. The RHNA identifiesCupertino’s regionalhousing needs by incomelevels: Income Group RHNA Very Low 356 Low 207 Moderate 231 Above Moderate 270 Total 1,064 The City is not obligated to construct the housing units identifiedby the RHNA. Rather, the City’s responsibility is to demonstrate adequate capacity, byidentifying specific sites, to satisfy the RHNA under existing zoning and land use policy. HCD generally requires jurisdictions to show a surplus of sites/units in order to guarantee that the City could realistically accommodate the RHNA allocations. General Plan Amendment In addition to the Housing Element, the City is also processing a General Plan Amendment GPA). The GPA was authorized by the City Council in August 2012 and begun in March 2013. The GPAincludes an analysis of the following key topics: A. Development Allocations - The primary purpose of theGPA is to replenish, re-allocate, and increase citywide office, commercial, hotel, andresidential allocations in order to plan for anticipated future development activitywhile keeping with the community’s character, goals, and objectives. B. Consolidate Review Of Individual GPA Requests - The secondary purpose of theGPA is to consolidate development requests by several property owners for amendments to the General Plan. The communityvision developed as part of the GPA process will help evaluate thedevelopment requests along with the associated General Planamendments being requested. The consolidated General Plan amendment process also provides a unique opportunity for the community toprovide input on the various requests received at a citywide level, instead of a site-by-site basis, which only looksat a limited scope. Three draft General PlanConcept Alternatives have been prepared that outlinedifferent future scenarios. The alternatives were developed to reflect community input (workshopsand online input) as well as to respond to regional economic growth factors andhousing needs. The alternatives range from minimal change to the current 2005 GeneralPlan (Alternative A) to more moderate growth (Alternative B) to a greater change in development criteria which reflect the various property owners’ requests (Alternative C). 479894 These changes in development intensity include changes to land uses, heights and development allocation. The alternatives specifically focus these changes on five major mixed-use corridors in the core of Cupertino – Homestead, North Wolfe, Heart of the City, North De Anza, and South De Anza. DISCUSSION: Housing Element Sites Criteria HCD Criteria HCD reviews each Housing Element’s sites inventoryto determine if adequate sites have been identified to meet the RHNA. Preparation of a “site suitability analysis” is an important step in addressingthe adequate sites requirement. For additional detailson HCD’s site suitability requirements and criteria, please see Attachment PC-1. A key pointto note in HCD’s criteria are that sites with a net density lower than 20 dwelling units per acre do not qualify for meeting affordable housing requirements. Therefore, most sites discussed later in thisreport are in areas that are at or above this density. Other Secondary Criteria (Sustainable Communities Strategy/One Bay Area Plan and Cupertino General Plan) In addition to the State-wide criteria that HCD uses to determine site suitability, the Sustainable Communities Strategy/OneBay Area Plan contribute additional criteriaregarding what makes a desirable housing site in the ABAG region. The region’s Sustainable Communities Strategy and the OneBay Area Plan focuses development in Priority Development Areas (PDA). The City’s General Plan policies are generally consistent with the strategies in the One Bay Area Plan. For additional detailson the other secondary criteria and PDA’s please see Attachment PC-1. Cupertino’s PDA has been identified with a yellow outline on Attachment PC-2. Potential Housing Element Sites Consideration of Housing Element sites is still in the preliminary stages. Through thisstudy session, the City will continue to discuss sites with the public. Additional sites may be identified via public input and Commissioner discussion. While several sites are discussed in the report, the City is only obligated to pick sites enough to cumulatively add upto 1,064 units. The cumulative totalof therealistic yield of all the sites proposed to date far exceeds the City’s RHNA. A map has been prepared (see Attachment PC-2) thatidentifies all the sites proposed to date. An accompanyingtable (Attachment PC-3) provides additionalinformation about each site. Sites are not in any particular order of priority. Sites in three categories have been identified on the map: Existing Housing Element sites – Seven sites identified in the 2007-2014 Housing Element are currently available . The others have either been redeveloped ordo not meet the criteria. o Lot Consolidation Potential – Sites adjacent to existing Housing Element sites that could be considered for addition into the Housing Element for more cohesive development. 480895 Sites Proposed By Property Owners – Ten property owners have indicated an interest in being included in the Sites Inventory. Most of thedevelopers have indicated a density range higher than that currently allowed by the General Plan and zoning for their site. Sites Proposed By Workshop Participants – Workshop participants atthe January 23, 2014 workshop identified 21 sites which could potentially be included in the Sites Inventory. Environmental Review An Environmental Impact Report (EIR) is being prepared for this project. The preparation of the EIR will commence once the City Councilprovides its comments on the sites to be analyzed as partof each alternative studied in the EIR at its March 4, 2014 meeting. The 30-day Notice of Preparation (NOP) period will commence soon after the City Council meeting, with a scoping session scheduled for March 11, 2014. It isanticipated that preparation of the Draft EIR will take about four monthsand will be released for public review in Summer 2014. A community open house isplanned during the 45- day public review period. Following the close of the public review period, a Final EIR will be prepared. The recommendation from the Environmental ReviewCommittee, public hearing for the Planning Commission and public hearing for the Council EIR review and certification are tentatively scheduled for Fall 2014. DISCUSSION: Summary of February 12 Housing Commission Workshop On February 12, the Housing Commission hosted a workshop to continue the Housing Element Sites discussion and prioritize sites for inclusion in the Housing Element. Following a project update presentation, approximately fifteen (15) participants broke into three groupsand discussed identification of new sites and prioritizing potential housing sites to meet the RHNA of 1,064. The groups generally seemed to agree that sites with multiple access points, minimal impacts to schools and generate minimal level of neighborhood concerns would be appropriate as Housing Element sites. Some of these included sites previously identified in thisreport. Some participants also added new sites to the list. Some of the sites were prioritized by one group but not by others and some of sites were only acceptable if new development was a mixed use one. The balance of the sites have been left on the list since there was no consensus on whether to keep or remove the sites. These have all been included in Attachments PC-2 and PC-3. Comments from the Public The following is a summary of the keypoints made at the February 12 meeting: Building heights should reflect the character of the City. Impacts of new housing on schools and traffic need to be carefully considered in the siting of housing. A balance of retail/restaurants andhousing needs to be achieved. Donot eliminate places where residentsshop and dine out. 481896 New housing should be distributedthroughout Cupertino. Provide opportunities for different forms of housing thatmay not be in Cupertino today, particularly for senior residents and recent college graduates who do not need as much living space. Given that the city is virtually built out, ensure that in future RHNA processes that Cupertino is not overburdened by a commitment to accommodateeven more housing. The Hampton site is a goodlocation to accommodate a large portion of the current RHNA. The current stock of affordable housing needs to be preserved to the extent possible. The Housing Commission recommended forwarding the sites highlightedby the workshop participants. Attachments PC-2 and PC-3 highlight the sites that the Housing Commission recommended forwarding to the Planning Commission for consideration. EIR Alternatives and Density Considerations for Sites The California Environmental QualityAct (CEQA) requires that alternatives to a project be studied. These must avoid or substantially lessen at least one of the significant impacts of the Proposed Project. In addition, CEQA does notpermit projects to be analyzed incrementally. A combined EnvironmentalImpact Report will be prepared for the General Plan Amendment as well as the 2014-2022 Housing Element. TheEIR will analyze the following key issues: TheGeneral Plan Amendments – As mentionedearlier in this staff report, the City is currently processing a GeneralPlan Amendment. Three draft GeneralPlanConcept Alternativesranging from minimal change to the current 2005 General Plan (Alternative A) to more moderate growth (Alternative B) to a greater change in development criteria which reflect the various property owners’ requests (Alternative C), have been prepared for analysis in the EIR. Alternatives A and B avoid or substantially lessen at leastone of the significant impacts of the Proposed Project (Alternative C). At thistime, no sites are proposed to be eliminated from the study except as discussed below for each alternative. The preferred sites will be noted when a review and decision on the finallist of sites is made by the City Council. The final decision on the list of sites is expected in Fall when the information on the EIR is available. It should be noted a lower densityon a site will increase the number of sites that need to be picked to cumulatively reach the 1,064 units RHNA obligation. o Alternative A will includepotential housing sites only within existing density ranges in the General Plan. Therefore, Alternative A will not include sites that propose a minimum density exceeding that allowed in the 2005 General Plan. The only change to this concept is in the SouthSunnyvale-Saratoga area (De Anza Boulevard area south of Highway 85), which is proposed to be combined with the South De Anza Boulevard Conceptual Plan (West side of De Anza Boulevard between Stevens 482897 Creek Boulevardand Bollinger Road). The density in the South Sunnyvale-Saratoga area will change from 15 dwelling units per acre to 25 dwelling units per acre to be consistent with the density in the South De Anza Boulevard Conceptual Plan Area. One site proposed by the property owner (Yamagami’s Nursery) is located in this area and will be studied in thisAlternative. o Alternative B represents moderate growth along five mixed use transit corridors. Therefore, in this Alternative, sites proposed by property ownersalong major transit corridors, and selected by the City Council for inclusion, will be studied at a density between that in Alternative A and Alternative C (highest density alternative). In this alternative, these sites would be studied at a densityof 35 dwelling units per acre instead of 25 dwelling units per acre. In general, the current General Plan allows 25 dwelling units per acre except in the South Vallco Area where it is 35 dwelling units per acre. One property owner (the Hamptons at Wolfe Road and Hwy 280) has proposed a density ranging from 65 to 110 dwelling units per acre on their site. Therefore, their site is the only one selected at the lower end of the density at 65 dwelling units per acre. The reason this site has been included at a higherdensity than 35 dwelling units per acre, is that it is located near the freewayand will cause minimal neighborhoodand school impacts (this site is served by the Santa Clara Unified School District). o Under Alternative C (the proposed project), Housing Element sites proposed by Property Owners, and selected by the City Council to satisfy the RHNA requirement, will be studied at the maximum density requested by the property owner. o Finally, CEQA requires the analysis of the No Project Alternative. The No Project Alternative assumes no change to the current General Plan. The analysis for this alternative will include buildout of the current 2005 GeneralPlan. Therefore, only the existinghousing element sites will be included in the analysis. Underthis scenario, there are no changes to existing land use policies, height limits, land use designations, or any additional development allocation for office, commercial, hotel andresidential units. No new sites will be studied. OtherHousing Element Requirements Update Housing Policies The update of the Housing Element has been dividedintotwo areas of review. The first area of review is the subject of this meeting - identification of adequate sites appropriately zoned in the City to accommodate the City’s RHNA. The second area of review is an analysis andupdate of the existing policiesandprograms which will be presented at a later date (tentatively April 1, 2014 at a Joint Planning Commission/City Council meeting.) Streamlined HCD Review 483898 HCD allows for streamlined review of the Housing Element if the jurisdiction meets certain criteria. This provides for priority review for jurisdictionsthat are eligible over jurisdictions that are eligible for standard review and limits the areas in which the HCD staff can comment on. These criteria include the adoption of an HCD-certified Housing Element, the adoption of a Density Bonus ordinance that conforms with State Law, the completion of re- zoning of all Housing Element sites that needed re-zoning with the 2007-2014 Housing Element update, the adoption of adequate zoning to permit emergencyshelters and transitional/supportive housing, and the establishment of areasonable accommodation procedure. If a jurisdiction is not eligible for thestreamlined review, HCD’s review generally takes longer—up to the 60 dayperiod they are permitted by law to review the documents, thereby potentially delaying the adoption of the Housing Element. The adoption deadline remains January 31, 2015 (plus a 120-day grace period.) The City currently complies with almost all of the requirements to qualify for thestreamlined review – the City has a HCD certifiedHousing Element that has been adopted, all the re-zoning that was required with the last Housing Element cycle wascompleted atthe same time as adoption of the Housing Element, completed updates to the municipal code to allow adequate emergency shelter and transitional/supportive housingand theestablishment of a reasonable accommodationprocedure. The final requirement – the adoption of a Density Bonus ordinance that conforms to State Law – needs to be completed prior to forwarding the draft of the Housing Element for HCD review. The Citywould have to comply with State Law with or without an updated ordinance. However, having an updated ordinance will allow the City to be eligible for streamlined review. Staff anticipates preparingthis ordinance for PlanningCommission review andCounciladoption atthe time of presenting the Draft Housing Element for forwarding to the HCD for its review in Fall 2014. PUBLIC NOTICING & OUTREACH In additionto the workshop at the Housing Commissionmeeting on February 12, 2014, the following outreach efforts have been undertakenon this project to date. Stakeholder Interviews Stakeholder interviews wereconducted on December 11 & 12, 2013 to solicit input from stakeholders ranging from community members, property owners, housing developers, service providers, School Districts andthe business community. The following is a summary of comments from the interviews: Overall housing affordability and the gap between housing demandand supply at all income levels Need diversityof affordable rental units at all income levels and all householdtypes Need to accommodate a growing aging population Smaller units including innovative housing models Support for mixed-use similarto Santana Row ordowntown Mountain View Should be low impacts to schools, privacy, parking, noise and traffic Significant financial constraints to affordable housing developers due to dissolution 484899 of Redevelopment School Districts north of the city are impacted due to higher student generation rates Looking to increase capacity by adding new buildings and temporary, modular units Most of the Apple Campus 2 school impact fee allocated to Santa Clara Unified District while the expectation is that most employees who move will reside within the CUSD service area. Summary of January 23 Joint PC/HC Workshop On January 23, thePlanning Commission and Housing Commission hosted a joint workshop to begin the Housing Element Sites discussion. Eleven participants broke into small groups and identified potential future sites for housing and criteria for increased density in certain areas including community benefits. Participants drew on maps and placed stickers to identify potential housing sites. The following is a summary of comments from themeeting: Demand for market-rate small-sized units (limited bedrooms) to cater to people working at Apple Add levels to school buildings to increase capacity Concerns about: o Churches now having to be considered Housing Element sites o Sustainability of the OneBay Area Plan o Size of the City’s RHNA obligation o Loss of community amenities to housing The following tablesummarizesthe noticing for this meeting. Notice Agenda Email sent to all interested parties signed up through the project website Letters sent to current Housing Element site property owners and interested property owners Posted on the City's official notice bulletin board (one week prior to the hearing) Posted on the City of Cupertino’s Web site one week prior to the hearing) Posted on the project Website (one week prior to hearing) NEXT STEPS The goal for this study session is to review the Housing Commissions’ input and sites presented to date, identify any other new potential sites for consideration, to place the sites in orderof preference. The City Council will meet on March 4, 2014 to provide staff with final direction on the Housing Element sites and densities to be studied in the EIR. The policy portion of the review of the Housing Element will be present to the Housing Commission in March 2014 and the Planning Commission and City Council atthe Joint meeting on April 1, 2014. 485900 Upon completion of the Final EIR, the Draft Housing Element will be reviewed by the Planning Commission and adopted by the Council in Fall 2014 for forwarding toHCD. The Draft Housing Element will include: housing policies as well as the final list of housing sites as well as the related General Plan Amendments and rezoning for the sites. In addition, in order to comply with streamlined HCD review, a Density Bonus Ordinance, will be prepared for review and adoption. Upon HCD review and potential certification, the final Housing Element will be presented for Planning Commission review and City Council decision in early 2015. Prepared by: Piu Ghosh, AICP, Senior Planner MIG, Consultant to the City of Cupertino Reviewed by: Approvedby: s/ Gary Chao /s/ Aarti Shrivastava Gary Chao Aarti Shrivastava Asst. Dir. ofCommunity Development Director of Community Development Attachments PC-1. Housing Commission Staff Report PC-2. Potential 2014-2022 Housing Element Sites Map, with HC Priorities Indicated PC-3. Potential 2014-2022 Housing Element Sites Summary Table, with HC Priorities Indicated 486901 CUPS TMNO SUBJECT: COMMUNITY DEVELOPMENT DEPARTMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014 -3255 408) 777 -3308 • FAX (408) 777 -3333 CITY COUNCIL STAFF REPORT Meeting: March 4, 2014 Study Session to review Housing Element requirements and sites to achievethe Regional Housing Needs Allocation (RHNA) for the upcoming 2014 -2022 Housing Element RECOMMENDATION: Staff recommends that the City Council: Review the report on potential Housing Element sites to be studied in the joint General Plan Amendment and Housing Element EnvironmentalImpact Report (EIR); and 2. Prioritize the housing sites in order of preference, if desired. BACKGROUND: Project Description Application No.: Applicant: Location /APN: GPA- 2013 -02 City of Cupertino Citywide Housing Element Overview In accordance with State law, California cities must have an adopted General Plan, which must contain a Housing Element. Housing Element law requires that all jurisdictions facilitate housing development by creatingpolicies and adopting land use plans and regulatory schemes that provideopportunities for housingdevelopment, including units that could accommodate households with very low, low, moderate and higher incomes. For information on Housing Elementcontent, please see Attachment CC -1 (Housing Commission Staff Report). State law requires that each city and countyupdate its Housing Element on a pre- determined cycle. For the current cycle, the updated Housing Element must be adopted by January 31, 2015 plus a 120 -day grace period). If this adoption deadline is met, the planning period for this cycle extends from adoption toJanuary 31, 2023 (or eight years). Otherwise, the City must update the Housing Element again in 2019 (every four years). The City Council approved the project scope of work and authorized the budget for the project on November 4, 2013. 902 Regional Housing Needs Allocation (RHNA) The RHNA is an estimate of projected needed housing units throughout the State and is based on Department of Finance population projections and regional population forecasts. The RHNA identifies Cupertino's regional housing needs by income levels: Income Group Very Low ( <_ 50% ofArea Median Income(AMI)) RHNA 356 Low(51— 80% of AMI) 207 Moderate(81 - 120% of AMI) 231 Above Moderate(> 120% of AMI) 270 FTotal 1,064 The City is not obligated to construct the housing units identified by the RHNA. Rather, the City's responsibility is to demonstrate adequate capacity, by identifying specific sites, to satisfy the RHNA under existing zoning and land use policy. HCD generally requires jurisdictions to show a surplus of sites /units in order to guarantee that the City could realistically accommodate the RHNA allocations. General Plan Amendment In addition to the Housing Element, the City is also preparing a GeneralPlan Amendment GPA) forCity Council consideration, as directed by the City Council in August 2012. The primary purpose of the GPA is to replenish, re- allocate, and increase citywide development allocations in orderto plan for anticipated future development activity while keeping with the community's character, goals, and objectives. The secondary purposeof the GPA is to consolidate development requests by several property owners for amendments to the General Plan, under a comprehensive community vision. DISCUSSION: Housing Element Sites Criteria HCD Criteria HCD reviews each Housing Element's sites inventory to determine if adequate sites have been identified to meetthe RHNA. Preparation of a "site suitability analysis" is an important step in addressing the adequate sites requirement. For additional details on HCD's site suitability requirements and criteria, please see Attachment CC -1. A key point to note inHCD's criteria is that sites with a net density lower than 20 dwelling units per acre do not qualify for meeting affordable housing requirements. With Cupertino's last Housing Element (2007- 2014), HCD accepted a realistic yield of 85% of the maximum density allowed onthe site, based on city - specific historic project approval data. This means that for a one acre site, while the maximum yield at a density of 25 dwelling units per acre is 25 units, the realistic yield for Housing Element purposes is (25 * 85 %) = 21 units. Therefore, most sites discussed later in this report are in areas that are at or above this density. 9903 Affordability Criteria HCD requires an additional componentof the site suitability analysis for those sites identified to meet the lower income portion of the RHNA (thisincludes the very low -, low -, and moderate - income RHNA). Cupertino's lower income RHNA requirement for the 2014 -2022 Housing Element is 794 units. To identify the sites andestablish the number of units that can accommodate the RHNA for lower- income households, the Housing Element must include an analysis that demonstrates that the sites identified have zoning regulations and densities in place that encourage and facilitate the development of housing forlower- incomehouseholds. Alternatively, Housing Element law allows local governmentsto utilize "default" density standards determinedby HCD. Per HCD's determination, suburban cities in Santa Clara County require a minimum "realistic" density of 20 dwelling units per acre orgreater to meet lower income requirements. Additionally, if properties need to be rezoned toaccommodate the RHNA on the sites identified, the zoning should be done in conjunction with the adoption of the Housing Element to avoid additional requirements that may be imposedby the HCD. The City intends to complete the necessary rezoning in conjunction with the Housing Element. Other Secondary Criteria (Sustainable CommunitiesStrategy /One Bay Area Plan and Cupertino General Plan) In addition to the State -wide criteria that HCD uses to determine site suitability, the Sustainable Communities Strategy /One Bay Area Plan contribute additional criteria regarding what makes a desirable housing site in the ABAG region. The region's Sustainable Communities Strategy and theOne Bay Area Plan focuses development in Priority Development Areas (PDA). Cupertino's PDA has been identified with a yellow outline on Attachment CC -3. The City's GeneralPlan policies are generally consistent with the strategies in the OneBay Area Plan. For additional details on the other secondary criteria, please see Attachment CC -1. Potential Housing Element Sites The City has solicited public input on theselection of sites for inclusion in the Housing Element. Through community workshops and study sessions with the Housing Commission and Planning Commission, conversations with property owners and stakeholders, and review of the previous Housing Element, multiple sites have been identified. Sites in four categories have been identified on the map: Existing Housing Element sites — Seven sites identified in the 2007 -2014 Housing Element are currently available. The others have either been redeveloped ordo not meet the criteria. Sites Proposed By Property Owners — Ten property owners have indicated an interest in being included in the Sites Inventory. Most of the developers have indicated a density range higher than that currently allowed by the General Plan and zoning for their site. 10904 Sites Proposed By Workshop Participants — Workshop participants at the January 23, 2014 and February 12, 2014 workshops identified 28 sites which could potentially be includedin the Sites Inventory. Lot Consolidation Potential — A few parcels indicated on the map are adjacentto existing Housing Element sites or proposed sites —these "lot consolidation potential" sites could be considered for addition with the adjacent site to facilitate a more cohesive development. The cumulative total of the realistic yield of all the sites proposed to date exceeds the City's RHNA. While several sites are discussed in the report, the City is only obligated to pick sites enough to cumulatively add up to 1,064 units (with some additional surplus to meet HCD's realistic capacity and Affordability criteria requirements). A map has been prepared (see Attachment CC -2) that identifies all the sites proposedto date. An accompanying table Attachment CC -3) provides additional information about each site. Sites are listed in alphabetical orderby category except lot consolidation potential sites which are listed immediately adjacent to the site forwhich potential has been identified. The attachments include direction andpreference as indicated by the Housing Commission as well as the Planning Commission (see discussion below). Sites that do not meet criteria or were suggested by the Planning Commission for removal have been indicated with a strikeout. The consultant has reviewed and categorized sites for their potential to meet HCD as well as the secondary criteria and listed them as Low, Moderate and High priority. It is recommended that the sites that have been categorized "low" be removed from the list of sites to ensure a manageable list of sites for study in the EnvironmentalImpact Report. Summary of February 19, 2014 Planning Commission Open Houseand Study Session OnFebruary 19, 2014, the Planning Commission held an OpenHouse and Study Session on the Housing Element, with a focus on reviewing and commenting on potential Housing Element sites identified to date. This meeting also addressed the concurrent General Plan Amendment process. (See Attachment CC -4 — Planning Commission Staff Report) During theopenhouse, residents and stakeholderswere invited to review posters to understand "What is a Housing Element" and a map indicating potential Housing Element sites identified to date. Posters showing the GeneralPlan alternatives were also available. Staff and consultants answered questions at the OpenHouse from several residents and stakeholders. Staffand consultants provided a presentation onthe GPAand Housing Element during the Study Session and the Planning Commission received public testimony and provided comments on the priority of on Housing Sites. The following is a summary of comments from the Planning Commission and the public. Whereapplicable, staff comments are noted in italics. 11905 Comments from the Public The following is a summary of the key points made at the meeting: Building heights should reflect the character of the City and neighborhoods inwhich they are located New housingshould be distributed throughout Cupertino Impacts of new housing on schools and traffic need to be carefully considered in the siting of housing (see comments on school impacts later in this staff report) There is a need for more affordable housing, especially rental housing Smaller units are preferable over larger units Planning CommissionDiscussion The Planning Commission recommended that in addition to retaining existing Housing Element sites that the balance of the sites be prioritized. They also recommended that the list of potential Housing Element sites be shortened with the following criteria in mind: Successful Shopping Centers - The Planning Commission noted that the existing uses on sites should be reviewedcarefully to purge the list of sites thatshould not be considered housing element sites. Particularly, the Commission discussed that sites that are developed with currently successful commercial centers should not be priority housing sites. Specifically, the Commission discussed not considering CupertinoVillage and Marketplace as goodcandidates for the Housing Element sites list. Institutional Sites - The Planning Commission agreed that sites that are owned by utility companiesor by the State orFederal Government should not be considered as good candidates for the Housing Element sites list since the likelihood of these propertiesbeing redeveloped in the current Housing Element cycle is minimal. Small Sites with low yield or no Property Owner interest - The Planning Commission recommended that smaller sites that yieldlimited or marginalhousing or where property owners have not indicated interest in redevelopment as a housing site be removed from the list. Distribute Housing - The Planning Commission recommended that the Hamptons site and the Vallco site be reviewed as high priority Housing Element sites. In addition to these, the Planning Commission indicated their preferenceto include sites along Foothill Boulevard and South De Anza Boulevard to distribute potentialhousingdevelopment throughout the City. Encourage Development along Priority Development Area (PDA) - The Planning Commission suggested that the City Council review densitiesalong major mixed -use corridors and possibly amend existing densities along the City's PDA to be consistent with existing densities alongHomestead Road and Wolfe Road. This is consistent with the secondary criteria developed for the housing sites. Minimize Impacts to Schools - Some Commissioners stated that the preference be that housing sitesbe selected basedon where the school impacts might be low. The City cannot 12906 consider impacts on schools as a result of new housing developments. SB 50 (State Government Code sections 65995 -65998 and Education Code sections 17620 - 17621) preempts CEQA consideration and mitigation of impacts onschool facilities (such as the need for new or expanded schools dueto additionalenrollment caused by new development). If newdevelopment pays standard school impact fees, there is no further role for CEQA with regard to impacts on schools nor may such projects be denied based on schools impacts (See Attachment CC -5 — Memo on Application of SB 50 to Consideration of Development Applications). In addition, State law prohibits the City from using its planning and zoning powers to denyresidency to, make housing unavailable to, or discriminate against, families with children. However, for large projects, there isthe potential for negotiated Development Agreements to result in additional benefits such as contributions towards schools, pocketparks, and traffic improvement. The following table indicates the sites, in addition to the existing Housing Element sites, that the Planning Commissionrecommended as priority sites for study: SiteSite Name and Land Use Current Size Density Realistic No. Location Designation Zoning Acres) DU /A) Capacity Lot Consolidation Sites (adjacentto existing Housing Element sites) East of E. Estates Commercial/ P(CG, Res) 25 19541 Richwood Dr. Office/ Residential East of E. Estates Commercial/ L7 P(CG, Res) 2.16* 2545 19550 Stevens Creek Blvd Office/ Residential East of E. Estates Commercial/ 10055 Miller Ave Office/ Residential P(CG, Res) 25 Property Owner DevelopmentInterest Sites (Density requested indicated) BatchBrothers Commercial/ P1 P(CG) 0.67 20-35 11 —19 22690 Stevens Creek Blvd Residential FoothillMarket ( @McClellan) Commercial/ P3 P(CG) 1.3 20-25 22-27 10625 S FoothillBlvd Residential The Hamptons High Density 686— P6 P(Res) 12.44 65-110 19500 Pruneridge Ave Residential (20 -35) 1162 Vallco Mall Commercial/ P(Regional P7 32.9 35 600-800 10123 N Wolfe Rd Residential Shopping) Summerwinds & Granite Rock Commercial/ P(CG, Res P8 1471, 1491 & 1505 S De Anza 4.13 25-40 87-140 OfOffice/ Residential 5 -15) Blvd Includes portion of E. Estates Drive 13907 Environmental Review A combined Environmental Impact Report will be prepared for the GeneralPlan Amendment and the 2014 -2022 Housing Element projects. The preparation of the EIR will commence once the City Council provides its comments on the sites to be analyzed as part of each alternative studied in the EIR. The next step of the EIR involves a scoping meeting (scheduled for March 11, 2014), which includes a 30 -daycomment period, to consult with agencies, organizations or individuals on the contents of the EIR, including the range ofalternatives. The final scope of the EIR, including possible additional alternatives, will be determined following completion of the scoping process. The California Environmental Quality Act (CEQA) requires the EIR to discuss a "reasonable range of alternatives," and should briefly discuss alternatives that are considered but rejected forfurther analysis during the scoping process. A proposed alternative need not be considered ifit would not avoid or substantially lessen significant impacts, would not meet most of the basic project objectives, is infeasible, or is not neededtohave a "reasonable range" of alternatives. It is anticipated thatpreparation of the Draft EIR will take about four months, and that the Draft EIR will be released for a 45 -day public review periodin late Summer 2014. A community open house is planned during the publicreview period. Following the close of the publicreview period, a Final EIR and responses tocomments will be prepared. The recommendation from the Environmental Review Committee, public hearing for the Planning Commission and public hearing for the Council EIR review and certification are tentatively scheduled for Fall 2014. EIR Alternatives and Density Considerations for Sites At this time, the only sites proposed to be eliminated from the study are those that do not meet the HCD and secondary criteria ( "criteria "), and those suggested by the Planning Commission for removal. In addition, each General Plan alternative will include sites as follows: AlternativeA - All housing sites that meet criteria will be included at densities that meet the 2005 GeneralPlan. Sites that are proposed with minimum densities exceeding the 2005 GeneralPlanor those that require land usechanges or rezoning will be eliminated except for onesite located in the South De Anza Area. The density in this area is being increased to 25 dwelling units per acre. Alternative B - All housing sites that meet criteria will be included at densities that fall between Alternative A and Alternative C. This alternative will include sites thatrequire changes to General Plan land use and rezoning but at densities lower than the maximum densities proposed by applicants. The densities will be reviewed for building height assumptions in Alternative B to ensure that the building envelopesdo not exceed the 14908 assumptions. Housing Element sites proposed by property owners along major transportationcorridors will be studied at 35 dwelling units per acre. Alternative C - All housing sites that meet criteria will be included in this alternative. This alternative includes sites that range from those that meetthe 2005 General Plan to those that requireland use and increased densities. This alternative includes sites at the maximum density proposed by applicants. It should be noted that a lower density on a site will increase the numberof sites that need to be picked to cumulatively reach the 1,064 units RHNA obligation. Additionally, sites that do not havedensities of 25 dwelling units per acre (realistic density of 20 dwelling units per acre) will not meet HCD's affordability criteria. As noted above, the final scope of the EIR, including possible additional alternatives will be determined following completion of the scoping process. The final decision onthe list of sites will be made in Fall 2014 upon certification of the EIR. Other Housing ElementRequirements Update HousingPolicies The update of the Housing Element has been divided intotwo areas of review. The first area of review is the subject of this meeting - identification of adequate sites appropriately zoned in the City toaccommodate the City's RHNA. Thesecond area of review is an analysisand update of the existing policies and programs which will be presented at a later date (tentatively April 1, 2014 at a Joint Planning Commission /City Council meeting.) Streamlined HCD Review HCD allows for streamlined review of the Housing Element if the jurisdiction meets certain criteria. Streamlined review provides for expeditious review and limits the areas of the Housing Element on which the HCD staff can comment. HCD's standard review generally takes longer, thereby potentially delaying the adoption of the Housing Element. For details on the criteria for eligibility for streamlined review of the Housing Element, please see Attachment CC -2. The City currently complies with almost all of the requirements to qualify for the streamlined review except for the adoption of a Density Bonus ordinance that conforms to State Law. The City has to comply with State Law with or without an updated ordinance. However, having an updated ordinance will allow the City to be eligible for streamlined review and needs to be completed prior to HCD review of the Draft Housing Element. This ordinance will be available for Planning Commission review and Council adoption at the same time as the Draft Housing Element in Fall 2014. The Draft will be forwarded to HCD as soon as it is adopted in Fall 2014. The HCD has 60 days to comment on the document, after which the City has to make any necessary revisionsto the Draft and adopt the final Housing Element. The due date for adoption is January 31, 2015. An additional grace period of 120 days is also provided. If the City does not meetthe deadline for adoption, the Housing Element will have to be updated 15909 every four years instead of every eight years. In addition, the City, potentially, could be subject to litigation and automatic approval of housing on identified Housing Element sites at a minimum density of 16 dwelling units per acre. Other Items for Council Consideration Gross Density vs. NetDensity The Council has in the past indicatedthat density should not be calculated on the gross acreage including a portion ofadjacent street area) of a property as currently allowed by the City's Zoning Code. The number of units assumed for the Housing Element sitesare based only on net lot area and do not include portions of adjacent streets. The related changes to the Zoning Code will be made in conjunction with the General Plan amendment. In addition, the Heartof the City SpecificPlan allowsresidential density to only be calculated on the acreage of a property net of the areas that service retail development. This requirement may reduce the yield and net density on a project site, which could either result in the mixed - use sites not meeting affordability criteria and /or requiring additional sites to be rezoned dueto the low yield. These issues will be analyzed and discussed in the Draft Housing Element. PUBLIC NOTICING & OUTREACH In addition to the openhouse and study sessionat the Planning Commissionmeeting on February 19, 2014, the following outreach efforts have been undertaken on this project to date. Postcards A postcard was delivered in February 2014 to all postal addresses in the City toannounce upcoming dates on the GeneralPlan and Housing Elementprojects. The postcard also provides a brief description of the two projects and identifies the project website where interested person may sign up for project updates and further notices. Website A website has been set up for the combined GeneralPlanand Housing Element projects at www.cupertinogpa.org. All technical reports, notices and other important information are available at the website. Interested persons may also submit comments at thewebsite. The website also has a separate tab for the Housing Element project which provides answers to Frequently Asked Questions. Meetings Stakeholder Interviews Stakeholder interviews wereconducted on December 11 & 12, 2013 to solicit input from stakeholders ranging from community members, property owners, housing developers, service providers, School Districts andthe business community. A summary of the key comments from thismeeting is available in Attachment CC -2. 16910 Joint PC /HC Workshop On January 23, 2014 the Planning Commission and Housing Commission hosted a joint workshop tobegin the Housing Element Sites discussion. Eleven participants broke into small groups and identified potential future sites for housing and criteria for increased density in certain areas including community benefits. Participants drew on maps and placed stickers to identify potentialhousing sites. A summary of the comments is available in Attachment CC -2. February 12 Housing Commission Workshop On February 12, the Housing Commission hosted a workshop to continue the Housing Element Sites discussion and prioritize sites for inclusion in the Housing Element. Following a project update presentation, approximately fifteen (15) participants broke into three groups and discussed identification of new sites and prioritizing potentialhousing sites to meet the RHNA of 1,064. A summary of the comments from the workshop is available inAttachment CC -2. The Housing Commission recommended forwarding all the sites highlighted by the workshop participants as priority sites to the Planning Commission for consideration. Noticing for March 4, 2014 City Council meeting The following table summarizes the noticing for thismeeting. NEXT STEPS The goal for this study sessionis for the City Council to review and provide comments onthe Housing Element sites anddensities to be studied in theEIR. City Councilmay choose to organize priority sites into tiers based on preference for inclusion or provide direction on removal of sites. The policyportion of the reviewof the Housing Element will be presented to the Housing Commission on March 19, 2014 andthe PlanningCommission and City Council at the Joint meeting on April 1, 2014. Uponcompletion of the Final EIR in lateSummer 2014, the Draft Housing Element will be reviewed by the PlanningCommission andpresented to the Council in Fall 2014 for adoption. The approved Draft Housing Element will include: housing policies as well as the final list of housing sites to meet the RHNA (which may include sites that require General Plan Amendments and rezoning, depending on Council's selection of sites). In addition, in order to comply with streamlined HCDreview, a Density Bonus Ordinance will be prepared for review 17 Email sent to all interested parties Posted on the City's official notice bulletin signed up through the project website board (one week prior to the hearing) Letters sent to current Housing Element Posted on the City of Cupertino's Web site site property owners, interested one week prior to the hearing) property owners and owners of sites Posted on the project Website (one week prior identified atthe workshops to hearing) NEXT STEPS The goal for this study sessionis for the City Council to review and provide comments onthe Housing Element sites and densities to be studied in theEIR. City Councilmay choose to organize priority sites into tiers based on preference for inclusion or provide direction on removal of sites. The policyportion of the reviewof the Housing Element will be presented to the Housing Commission on March 19, 2014 andthe Planning Commission and City Council at the Joint meeting on April 1, 2014. Upon completion of the Final EIR in lateSummer 2014, the Draft Housing Element will be reviewed by the Planning Commission and presented to the Council in Fall 2014 for adoption. The approved Draft Housing Element will include: housing policies as well as the final list of housing sites to meet the RHNA (which may include sites that require GeneralPlan Amendments and rezoning, depending on Council's selection of sites). In addition, in order to comply with streamlined HCDreview, a Density Bonus Ordinance will be prepared for review 17911 and adoption. After Council adoption, the Draft Housing Element will be forwarded to HCD for its review. Upon HCD's review, any necessary revisions will be made and the final Housing Element will be presented for Planning Commission review and City Council decision in January 2015. Prepared by: Pin Ghosh, AICP, Senior Planner MIG, Consultant to the City ofCupertino Reviewed bv- Gary Chao, Assistant Director of Community Development and Aarti Shrivastava, Director of Community Development Approved for Submission b3: David Brandt, City Manager Attachments CC -1. Housing Commission Staff Report dated February 12, 2014 CC -2. Potential 2014 -2022 Housing Element Sites Map, with PC and HC Priorities Indicated CC -3. Potential 2014 -2022 Housing Element Sites Summary Table, with PC and HC Priorities Indicated CC -4. Planning Commission Staff Report dated February 19, 2014 CC -5. Memo - Application of SB 50 to Consideration of Development Applications im912 i° 1 ii Subl ect COMMUNITY DEVELOPMENTDEPARTMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014 -3255 TELEPHONE: (408) 777 -3308 www.cupertino.org CITY COUNCIL STAFF REPORT Meeting: March 4, 2014 Study Session to provide an update on the focusedGeneral Plan Amendment (GPA- 2013 -01) process and review land use alternatives to be considered for analysis in the Environmental Impact Report (EIR). Proposed alternatives include options for City -wide development allocations (office, commercial, hotel, and residential), as well as building heights anddensities for corridors, special centers, and seven study areas. Recommended Action Staff recommends that the City Council: Review theGeneral Plan Amendment (GPA) Concept Alternatives to be studied in the EIR and provide comments. Discussion This report is an update to the discussion at the Planning Commission study session onthe GPA Concept Alternatives to be studied in the EIR. A detailed discussion of issues is provided in the February 19, 2014 Planning Commissionstaff report (Attachment CC -1). Background OnFebruary 19, 2014, the Planning Commission conducted a study session on the GPAConcept Alternatives to be studied in the EIR. Members of the public attended an open house prior to the study session that included stations showcasing Draft GeneralPlan Community Vision and Guiding Principles, Concept Alternatives, andthe proposed Housing Element sites. Please refer to Attachment CC -1 for the Planning Commissionstaff report for a detailed discussion of the GPA process overview, a summary of the variousreports that have been produced for the project, and descriptionof the Concept Alternatives. Also attached to this report are the other attachments including the Settings and Opportunities Report (Attachment CC -2); Market Study (Attachment CC -3); Concept Alternatives Report Attachment CC -4); Concept Alternatives comparison tables (Attachment CC -5); Community Workshop #1 Summary (Attachment CC -6); and Mobility and Design Concepts Input Summary Attachment CC -7). 57913 Discussion from the February 19, 2014 Planning Commission Study Session The following is a summary of Planning Commissioner comments at the February 19, 2014 study session. Where applicable, staff comments are provided in italics. Project - wide /community benefits to be considered for future projects with heights and /or densities above the base allowances in any corridor should notallow heights anddensities beyond the maximum contemplated in the General Plan — The GPAalternatives propose specific heights and densities even for projects that provide project - widelcommunity benefits. Therefore, projects that require heights and densities beyond those proposed will not be allowed under the proposed General Plan alternatives. Project - wide /community benefits for increased heights and /or densities should be clearly stated in the General Plan and should not be negotiable — It is intended that the General Plan provide a clear list of project- widelcommunity benefits related to height and/ordensity. Visualizations of the different heights and densities proposed in each of the Concept Alternatives should be provided — These will be provided at the presentation at the March 4, 2014 Councilstudy session. Impacts to schools should be considered with respect to increased development potential — The City cannot consider impacts on schools as a result of new housing developments. SB 50 (State Government Code sections 65995 -65998 and Education Code sections 17620 - 17621) preempts CEQA consideration and mitigation of impacts onschool facilities (such as the need for new or expanded schools due to additionalenrollment caused bynew development). If new development pays standard school impact fees, there is no further role for CEQA with regard to impacts on schools. In addition, State law prohibits the City from using its planning and zoning powersto deny residency to, make housing unavailable to, ordiscriminate against, families with children. However, for large projects, there isthe potential for negotiated Development Agreements to result in additional benefits such as contributions towards schools, pocket parks in the development, traffic improvements beyond required mitigations, etc. The specific allocations for the Vallco Shopping District should be clarified under each of the Concept Alternatives — Allocations are distributed by corridors and other existing General Plan Special Centers in the Concept Alternatives Report in order to allow flexibility of use across a greater area. Therefore, there are not specific allocations assigned for the Vallco Shopping District. However, the following are assumptions for the Vallco Shopping District in Alternatives A -C: Vallco Shopping District Alternative A Alternative B Alternative C Office (s.f.) 0 (no change) 1,000,000 2,000,000 Commercial (s.f.) 1,267,601 (no change) 625,335 Hotel (rooms) 150 400 Residential (units) 0 (no change) 600 800 914 Densities along major mixed -use corridors should be reviewed and possibly amended to provide residential densities that are consistent with that along Homestead Road and Wolfe Road — The GPA Alternatives do not contemplate changes todensitieson a corridor -wide scale, with the exception of the SouthDe Anza Corridor, from 15 to 25 du /ac, to ensure that Housing Element sites in the corridor meet density requirements for affordable housing. However, there are targeted changesto densities in the sites proposed in the Housing Element (see staff report for the Housing Element). The Commission also asked if stakeholders had reached out to the community with their specific projects — The applicants have not solidified their site specific plans as yet. This will be done once the Council has made a decision on the General Plan amendment and the allowable heights and densities have been determined. This process allows community involvement at a much earlier level than is typical for mostprojects. Once the developers draft their site - specific plans based on the final adoptedGeneral Plan, neighborhoodmeetings will be scheduled to gather community input on the projects. There may be concerns with Alternative C since therehave been historic community concernson higher levels of development and increased heights and densities. There are concerns with BRT, particularly with the option involving a dedicated BRT travel lane. The Vallco Shopping District should be redeveloped. Residential development should only be allowed with a complete redevelopment including viable retail. Residential uses in the Vallco Shopping District may not guarantee viable retail. Potential office and residential components in the Vallco Shopping District could be synergistic with a retail component. There is heightened community sensitivity with school and traffic impacts. Consider distributing housingdevelopment throughout the Cityin order to balance potential impacts. The following is a summary of public comments atthe February 19, 2014 study session: Vallco Mall needs to be revitalized. Height limits shouldremain unchanged. Maintain existingresidentialneighborhoods and shoppingdistricts. New developmentshould consider school and traffic impacts, as well as traffic estimates from recentlyapproved projects. Consider traffic impacts on Stevens Creek Boulevard and Bollinger Road onthe east side of Cupertino, and the traffic impacts to neighborhoods boundedby these streets. Neighborhood traffic impacts should be included in the EIR. Cupertino residents' input on densities and heights in the Concept Alternatives should be considered, rather than that of property owners and developers. 59915 Residentialallocations in the Concept Alternatives should consider previous ABAG projections — The previous Regional Housing Needs Allocation (RHNA) for the 2007 -2014 Housing Element (1320 units) was greaterthan that for the 2014 -2022 Housing Element (1064 units). Consider the seven study area sites and others to meet ABAG residential projections. In the community designsurveys, Cupertino residents should have been able to give their preference on existing Cupertino buildings and streetscape features. What criteria determine retail and project - wide /community benefits? Residentialallocations should be distributedthroughout the City, particularly in the Monta Vista area and along Stelling Road and Foothill Boulevard. The City has sufficient office and commercial development. Mixed -use development is not desirable. Residential densities should be low. Bus Rapid Transit (BRT) is not desirable, particularly the option involving a dedicated BRT travel lane. Not enoughnotice was given for the community workshops. Noticing In addition to the open house and study session at the Planning Commission meeting on February 19, 2014, the following outreach efforts have been undertaken on this project to date. Postcards A postcard was delivered in February 2014 to all postal addresses in the City to announce upcoming dates on the GPA and Housing Elementprojects. The postcard also provides a brief description of the two projectsand identifies the project websitewhereinterested persons may sign up for project updates and further notices. A previous City -wide postcard was sent in July 2013 announcing Community -wide Workshop 1 (discussed below). Website A website hasbeen set up for the combined GPAand Housing Element projects at www.cupertinogpa.org. All technical reports, notices, and other important information are available at the website. Interested persons may also submit comments atthe website. Workshops, Public Meetings, Commission/Committee Meetings, and Stakeholder Meetings Community -wideWorkshop #1 (July 18, 2013) - OnJuly 18, 2013, the City hosted a community - wideworkshop to kick off the GPA project. As discussed above, a City -wide postcard was sent to all City addresses, and the City's website and project website also announced the workshop. In addition, e -mails were sent to all stakeholders and otherinterested parties. Following a presentation, workshop participants were asked to discuss and participate in 1916 small group exercises whichincluded a discussion of assets and mobility, urban design or economic challenges thatshould be addressed by the GPA and opportunities forfuture development. See Attachment CC -6 for a workshop summary, which contains a compilation of the assets, challenges, and opportunities identified by the workshop participants. Community -wide Workshop #2 (October 23, 2013) - OnOctober 23, 2013, the City held a second Community -wide Workshop to discuss community ideas forfuture uses, design and mobility concepts along major mixed -use corridors (Homestead, De Anza, Wolfe, and Stevens Creek) and within the Vallco Shopping District. E -mails were sent to all study area stakeholders, Community -wide Workshop #1 participants, and otherinterestedparties. The City's website and project website also announced the workshop. Following a presentation, workshop participants were asked to participate in a Community DesignSurvey and Vallco Mapping Exercise. See Attachment CC -7 for a workshop summary. Other Public Meetings — The City also held the following additional meetings which covered essentially the same concepts from Community -wide Workshop #2: Follow -up meeting for interested Cupertino residents onDecember 5, 2013 Meeting with the Chamber of Commerce on January 29, 2014 Annual meeting of the Cupertino Neighborhood Block Leaders on January 29, 2014. See Attachment CC -7 for the meeting summaries. Commission and Committee Meetings — City staff introduced the GPAproject before certain City Commissions and the Cupertino Chamber of Commerce's Legislative Action Committee (LAC) in order to expand awareness of the project, receivefeedback, and answer questions. Staffpresented the project at the: October 2, 2013 Teen Commission meeting; December 6, 2013 and February 7, 2014 Legislative Action Committee meetings; and January 15, 2014 Bicycle and Pedestrian Commissionmeeting Stakeholder Meetings — Meetings with key neighborhood representatives, organizations including the Chamber of Commerceand VTA), property owners in the study areas, etc. were held from May 2013 through February 2014. The following table summarizes the noticing for the March 4, 2014 Council meeting: 61 Email sent to all study area Posted on the City's official notice bulletin stakeholders, prior workshop board (one week prior to the hearing) participants, and interested parties Posted on the City ofCupertino's Web site signed upthrough the project website one week prior to the hearing) Citywide postcard sent to all addresses Posted onthe project Website (one week in the City prior to hearing) 61917 Environmental Impact Report The goal for this study session is for the Council to collect public input and provide comments on the Concept Alternatives. The next step of the EIR involves a scoping meeting, which includes a 30 -daycomment period to consult with agencies, organizations or individuals on the contents of the EIR, including the range ofalternatives. The final scope of the EIR and additional alternatives may be identified through the scoping process. CEQA requires the EIR to discuss a "reasonable range of alternatives," and should briefly discuss alternatives that are considered but rejected for further analysis during the scoping process. A proposed alternative need not be considered unless it would reduce significant impacts, meet most of the basic project objectives, is feasible, and is needed tohave a reasonable range" of alternatives. It is anticipated thatpreparation of the Draft EIR will be released for public review in late Summer 2014. A community open house is planned during the 45 -day public review period. Following the close of the publicreviewperiod, a Final EIR will be prepared. The recommendation from the Environmental Review Committee, public hearing for the Planning Commission and public hearing for the Council EIR review and certification are tentatively scheduled for Fall 2014. Next Steps The following additional meetingshave been scheduled for the GPA: March 11, 2014: Environmental Scoping Meeting on the GPA and Housing Element April 1, 2014: Joint City Council and Planning Commission Study Session on the GPA and Housing Element. This meeting will involve a discussion of policiesto be included in the GPA and Housing Element. Prepared by: George Schroeder, Associate Planner Reviewed by: Gary Chao, Assistant Director of Community Development and Aarti Shrivastava, Director of Community Development Approvedfor Submission by: David Brandt, City Manager Attachments: CC -1. February 19, 2014 Planning Commission staff report CC -2. Settings and Opportunities Report CC -3. Market Study CC -4. Concept Alternatives Report CC -5. Concept Alternatives Comparison Tables CC -6. Community Workshop #1 Summary CC -7. Mobility and Design Concepts Input Summary Z918 COMMUNITY DEVELOPMENT DEPARTMENT CITY HALL 10 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 TELEPHONE: (408) 777-3308 www.cupertino.org JOINT CITY COUNCIL/PLANNING COMMISSION STAFF REPORT Meeting: April 1, 2014 Subject Study Session on major policy topics to be considered in the focused General Plan Amendment (GPA-2013-01) process. Recommended Action Staff recommends that the Planning Commission and City Council:  Review policy topics for the General Plan Amendment (GPA) and provide comments. Discussion Background Recent Study Sessions On February 19, 2014, the Planning Commission conducted a study session on the GPA Concept Alternatives and Housing Element sites to be studied in the Environmental Impact Report (EIR). Members of the public attended an open house prior to the study session that included stations showcasing Draft General Plan Community Vision and Guiding Principles, Concept Alternatives, and the proposed Housing Element sites. On March 4, 2014, the City Council conducted a similar study session and directed staff to study the three proposed Concept Alternatives (Alternatives A, B, and C) in the EIR for the General Plan and Housing Element. The Council will make the final decision on the preferred alternative in the fall. Modifications to the Concept Alternative Diagrams Since the March 4, 2014 study session, minor modifications have been made to the Concept Alternative diagrams based on Council’s comments and selection of Housing Element sites to be studied in the EIR. The modifications are only for the purpose of study in the EIR and are summarized below:  The geographic distribution of residential allocations in Alternatives B and C was updated in order to be consistent with the Housing Element Update sites selected by the Council for study in the EIR. The residential density for the Stevens Creek & 85 Gateway was updated to be consistent with the Housing Element site selected by the Council for study in the EIR in Alternatives B and C. 919 The residential density for the North Crossroads Sub-Area was updated to be consistent with the Housing Element densities for Stevens Creek Office Center and Marina Plaza selected by the Council for study in the EIR in Alternatives B and C. These two Housing Element sites are being studied at increased densities and are located at two ends of the North Crossroads Sub-Area (Stevens Creek Office Center and Marina Plaza). The density increase was applied to the North Crossroads Sub-Area for consistency in the EIR. Clarifications to notes and allocation tables. Clarification that retail is not required for certain additional heights for The Hamptons Housing Element site selected by the Council for study in the North Vallco Gateway, since the site is currently zoned residential only and will continue to be zoned for residential purposes. Please refer to Attachment A for the revised Concept Alternative diagrams. Update on the Retail Strategy On March 6, 2014, the City published a Retail Strategy Report that analyzes retail in Cupertino, particularly each GPA study area’s suitability for retail development. The report is intended to help inform community discussions regarding potential changes to future land uses, heights and intensities, and development allocations along Cupertino's major mixed-use corridors. The report pays particular attention to future repositioning or revitalization options for the Vallco Shopping Mall and larger shopping district. Please refer to Attachment B for the Retail Strategy. General Plan Amendment Policy Topics The General Plan Amendment process is a focused update of the 2005 General Plan. While the majority of the General Plan’s content will remain the same, there are several major policy topics that will be addressed through new or updated goals, policies, standards or programs. The policy topics are broken down in the following three major categories:  Major Policy Concepts: Ideas that have emerged during the General Plan Amendment process for consideration by the Planning Commission and City Council.  Recent State Requirements: Recent State laws that need to be addressed in the amended General Plan.  Clean-up Items: Updates and corrections that are proposed to be included in the amended General Plan. Each of the major policy concepts and several recent state requirements prompt questions for the input from the Planning Commission and City Council. Major Policy Topics A. Draft 2040 Community Vision and Guiding Principles The draft 2040 Community Vision is based on the current 2005 General Plan’s vision, and has been updated to reflect extensive community input on Cupertino’s future conducted in 2013. This includes ideas, thoughts and desires from residents, local business and property owners, 920 study area stakeholders, elected and appointed officials, and other members of the Cupertino community. The draft 2040 Guiding Principles provide additional detail about Cupertino’s future. Similar to the Community Vision, the Guiding Principles build from the current 2005 General Plan’s Guiding Principles and have been updated based on extensive community input conducted in 2013. The Guiding Principles were refined based on additional community input and reviewed by the Planning Commission and City Council in February and March 2014, respectively. Please refer to Attachment C for the Draft Community Vision and Guiding Principles. CC/PC POLICY QUESTIONS: 1. Are there any topics that are missing from the Draft 2040 Community Vision that should be added? 2. Are there any topics that are missing from the Draft 2040 Guiding Principles that should be added? Action: Following comments by the Planning Commission and City Council, staff will present the Final 2040 Community Vision and Guiding Principles in the Draft General Plan. B. Development Allocation System Changes The City controls growth through a Development Allocation system that establishes a City- wide “pool” of available future residential, hotel, commercial, and office allocation which new projects can draw from. The purpose of this system is to ensure that new development fulfills community goals and priorities, while minimizing traffic and quality of life impacts. Allocations are assigned to various geographic areas in the City to provide general guidance as to where growth is expected to occur, to study environmental effects, and to plan the circulation network and infrastructure needed to support growth. The City currently allocates development potential on a case-by-case basis to private projects based on the community benefits the project would provide. The current system intentionally allows flexibility among the allocations assigned to each geographical area. Allocations may be redistributed from one geographical area to another if necessary and, if significant environmental impacts, including traffic impacts, can be mitigated. For the purposes of allocation in the seven GPA study areas, it is assumed that development allocations will be reserved for a period of up to five years depending on the Planning Commission and Council’s input. Allocations for the Vallco Shopping District will be permanently set aside as to incentivize revitalization. Relationship to the 2040 Guiding Principles: This concept would apply to Guiding Principles #6, #7 and #11. 921 CC/PC POLICY QUESTION: 1. Should the existing Development Allocation policy be kept flexible or should it be updated to require additional review to move allocations between different geographic areas? Action: Any changes to this policy would be addressed through revisions to existing policies in the Land Use/Community Design Element. C. Community Benefits Program During the GPA process, workshop participants have suggested that in order to build talle r than the maximum allowed heights, new development in the major mixed-use corridors should provide a retail component and/or direct benefits for the City and the community. These benefits would include items that have been discussed by the community as being needed or desirable in Cupertino. The rationale for this approach is to ensure that new, more intensive development directly benefits the broader Cupertino community, beyond just economic or fiscal or project benefits. Under the Community Benefits Program discussed in Alternatives B and C, the Planning Commission and City Council would have discretionary approval to allow additional height under two “tiers.” Tier 1 projects would include a retail component for a moderate height increase. Tier 2 projects would include both a retail component and a community benefit for greater height increases. The specific increases by geographical area are shown on the Concept Alternative diagrams for B and C in Attachment A. Community benefits would have to be above and beyond what is required for projects that build within the standard height limits. The initial list of potential community benefit categories includes:  Affordable Housing: o Provision of housing within a project above and beyond BMR requirements o Provision of land to build an affordable housing project o Provision of funding to build an affordable housing project  Arts and Cultural Facility  Community Facilities: o Senior center o Childcare center o Teen/youth facility  Conference Space  Museum  Parks and Open Space (accessible to the public): o Contribution towards parkland o Provide park/open space in a project o Rooftop parks/open space 922  Schools: o Funding for operations or facilities o Providing facilities in a project o Partnerships for projects o Teacher housing  Tax Revenue Generators o Retail  Transportation Improvements: o Bike and pedestrian trails o Transit amenities o Contribution towards transit o Community shuttles (to move people around to key commercial centers) Ultimately, the specific list of community benefits would be included in the General Plan, and potentially, in applicable Specific and Master Plans, and the City’s Municipal Code. Timing and funding of the various projects and criteria would be included in project-specific conditions of approval and/or Development Agreement. Relationship to the 2040 Guiding Principles: This concept specifically implements Guiding Principles #5, #6, #7, #9, #10 and #11. CC/PC POLICY QUESTIONS: 1. Should a comprehensive Community Benefits program be developed and included in the amended General Plan? 2. What should the list of Community Benefits include? 3. Should there be the program have two tiers for height allocation, or should the program just focus on community benefits from the approved list? 4. If two tiers are acceptable, what types of projects would be considered “retail?” Action: This change would be addressed through revised policies in the Land Use/Community Design Element and Circulation Element. D. Healthy Community Strategies A healthy community promotes a positive physical, social and economic environment that supports the well-being of its residents, workers and visitors. Healthy communities are places that encourage healthy eating and physical activity. A typical healthy community strategy for a general plan includes components such as:  Walkable and bikeable communities with “complete streets” designed for all modes of transport, as well as dedicated trails  Transportation options and access to public transit  Community focal points, a sense of place 923  Parks, open space, public spaces, and trails  Access to nutritious food  Recreation, nutrition, and education programs  Adequate housing including mixed use neighborhoods and housing choices to accommodate different life stages  Healthy schools with healthy nutrition and physical activity policies and practices  Access to appropriate health care  Worksite wellness initiatives Relationship to the 2040 Guiding Principles: This concept specifically implements Guiding Principles #1 through #10. Community Input: There was strong community workshop support for improved access to open space and walkable/bikeable areas in Cupertino. CC/PC POLICY QUESTION: 1. Should the City incorporate Healthy Community strategies and policies throughout the amended General Plan? Action: This change would be addressed through new policies and/or programs in the Land Use and Community Design Element, Circulation Element, and the Health and Safety Element. E. Technology Infrastructure and Access Efficient and accessible technology is critical to improving the quality of life of residents and ensuring local businesses have the infrastructure necessary to be competitive in a global economy. While most technology-related infrastructure is privately financed and constructed (e.g., telecommunications, fiber optics, WiFi), the City has the ability to work with the private sector to expand access to technology infrastructure throughout the Cupertino. The City can help identify technology deficiencies, coordinate public and private entities to expand infrastructure, and ensure that there is adequate access for all residents, workers and visitors. Relationship to the 2040 Guiding Principles: This concept specifically implements Guiding Principles #1, #9 and #12. Community Input: Improved technology infrastructure was a common theme at the workshops. CC/PC POLICY QUESTION 1. Should the City develop policies to expand technology infrastructure and access throughout Cupertino? 924 Action: This concept would be addressed through new policies and/or programs in the Land Use and Community Design Element, and Health and Safety Element. Recent State Requirements In addition to major policy concepts, there have also been recent changes to State law that affect the legal and content requirements of a general plan. While the City has flexibility on how to meet these requirements, the final General Plan Amendment document will need to adequately address recent State laws and regulations. The following is a summary of these requirements. A. Greenhouse Gas Reduction Assembly Bill 32 (2008) requires the California Air Resources Board to adopt regulations that achieve 1990 greenhouse gas levels by 2020. To achieve these statewide emissions reductions targets, CEQA Guideline Amendments (SB97), require agencies to determine, consider, and mitigate project greenhouse gas emissions impacts. To simplify this process for local governments, the Bay Area Air Quality Management District CEQA Guidelines outlines steps to develop a qualified-greenhouse gas emissions reduction strategy or climate action plan in accordance with OPR Guidance, which sets forth a process for tiering and streamlining the analysis of project-related greenhouse gas emissions: To achieve these requirements, the City must demonstrate how it will achieve greenhouse gas reduction standards through land use decisions, including the general plan. The law also includes Smart Growth Principles that should be included within the amended General Plan as a major strategy for reducing greenhouse gas emissions. Some recommended principles include encouraging mixed-use and transit-oriented development, expanding pedestrian and bicycle corridors, creating a job/housing balance, establishing incentives for developments that have flexible development standards and shared parking arrangements, creating density bonuses for affordable housing and live/work developments, and reducing vehicle trips through land use and urban design. Relationship to the 2040 Guiding Principles: This requirement relates to Guiding Principles #3, #4 and #10. Community Input: Improved air quality and reduction of traffic congestion was a common theme at community workshops. Action: These requirements will be addressed in the Climate Action Plan (CAP) being developed concurrently with the GPA process, but CAP’s are not required by State law. The Climate Action Plan will include a detailed strategy and policy framework to show how the City will meet local, regional and State greenhouse gas reduction and sustainability targets and achieve 925 emissions reductions that will arise from the GPA. This Climate Action Plan, once adopted following certification of an EIR, may be used in the cumulative impact analysis of later projects. The General Plan will include a reference to the Climate Action Plan for consistency and to realize the emissions reductions mitigations established by the Climate Action Plan. Also, the General Plan EIR will include an inventory and analysis of greenhouse gas emissions and reduction strategies. B. Sustainable Communities Strategies Senate Bill 375 (2008) is the primary implementation tool of AB 32. The law requires regional agencies (MPOs) to demonstrate how regional land use, housing, and transportation planning decisions will reduce greenhouse gas emissions. To do this, the law requires all MPOs to update their Regional Transportation Plans (RTPs) and prepare Regional Housing Needs Allocations (RHNA) that result in development patterns and supporting transportation networks which reduce greenhouse gas emissions from cars and light trucks. It also requires MPOs to prepare land use and transportation planning strategies that reduce greenhouse gas emissions, which are to be incorporated as an additional element of its RTP. A major focus of this law is to achieve regional sustainability. As a major implementation piece, the law requires regional agencies to prepare a Sustainable Communities Strategy (SCS) in conjunction with Regional Transportation Plan (RTP). ABAG and MTC recently developed the regional SCS for the Bay Area, known as the One Bay Area Plan. The SCS will effectively act as a blueprint for future regional land use and transportation decisions. It will identify the general location of uses, residential densities and building intensities within the region. It will also describe how the development pattern and transportation network can work together to feasibly reduce greenhouse gas emissions consistent with the reduction targets allocated by State. Having the General Plan consistent with the SCS will also allow the City to streamline the environmental review of certain future projects, so long as they are consistent with the SCS. This can be a large incentive for the development community, and can be leveraged by the City to gain support for sustainable growth policies and programs. Relationship to the 2040 Guiding Principles: This requirement relates to Guiding Principles #1 through #6, #9 and #10. Community Input: Varied support was received at community workshops for sustainable development and locations of increased growth. Action: The Concept Alternatives prepared during the GPA process allocate future residential and employment growth consistent with the One Bay Area Plan. The forecast estimates in the One Bay Area Plan form the basis of the Regional Housing Needs Assessment (RHNA) for jurisdictions in the Bay Area. The residential allocations in the Concept Alternatives exceed the 926 RHNA for Cupertino (1,064 units). The One Bay Area Plan identifies the Stevens Creek and De Anza corridors as Priority Development Areas (PDAs) as potential areas where residential and employment growth may occur because they are major transportation and transit corridors. Alternatives B & C of the EIR anticipate that development in Cupertino will occur consistent with the One Bay Area Plan. In addition to land use and development allocation assumptions, the General Plan will also address local, regional and State sustainability targets through new policies and/or programs in the Land Use/Community Design Element, Circulation Element, Housing Element, Environmental Resources/Sustainability Element, and Health and Safety Element. C. Complete Streets Assembly Bill 1358 (2008) requires local jurisdictions, upon any substantive revision to their circulation element, to plan for a balanced multi-modal transportation network. This includes meeting the needs of all users of streets, roads and highways, including motorists, pedestrians, bicyclists, children, persons with disabilities, seniors, movers of commercial goods and users of public transportation. The City’s General Plan will need to include policies related to complete streets and identify specific areas for improvements in both standards and the Circulation Diagram. These changes will result in not only a reduction of greenhouse gas emissions, but also promote a better quality of life for Cupertino residents, since they will have greater options for how they move around the city. There is flexibility on how the City addresses Complete Streets requirements. The following comments raised during community workshops are potential policies that can be included/expanded upon in the General Plan: Improve connections from neighborhoods to schools and community facilities (e.g., parks, community centers, neighborhood shopping, etc). Retain and improve school and community facilities and neighborhood centers around existing residential neighborhoods. Create more separated pathways to schools, not just sidewalks, to provide safe walking and bike access from new developments. Develop bike and pedestrian paths on existing public easements for safe and easy access. Identify ways to retrofit and improve major streets for bicyclists and pedestrians. Relationship to the 2040 Guiding Principles: This requirement relates to Guiding Principles #1, #3 and #4. Community Input: Improved mobility from neighborhoods to schools, parks, and shopping for all users of the street (including bicycle and pedestrian users) was a common theme raised by participants during community workshops. CC/PC POLICY QUESTIONS: 927 1. Should the City create more detailed policies and programs related to the draft list included above? 2. Are there other key projects or ideas the Planning Commission and City Council would like staff to include in the draft General Plan? Action: This requirement will be addressed through new policies and/or programs in the Circulation Element and Land Use/Community Design Element. D. Level of Service (LOS) Changes Senate Bill 743 (2013) creates a process to change the way that transportation impacts are analyzed under CEQA. Specifically, the law requires the Governor’s Office of Planning and Research (OPR) to amend the CEQA Guidelines to provide an alternative to LOS for evaluating transportation impacts. Particularly within areas served by transit, those alternative criteria must “promote the reduction of greenhouse gas emissions, the development of multimodal transportation networks, and a diversity of land uses.” Measurements of transportation impacts may include “vehicle miles traveled, vehicle miles traveled per capita, automobile trip generation rates, or automobile trips generated.” OPR also has discretion to develop alternative criteria for areas that are not served by transit, if appropriate. Once the CEQA Guidelines are amended to include those alternative criteria, auto delay, as measured solely by LOS or similar measure of traffic capacity or congestion, will no longer be considered a significant impact under CEQA. Transportation impacts related to air quality, noise and safety must still be analyzed under CEQA where appropriate. The law also amended congestion management laws to allow cities and counties to opt out of LOS standards within certain infill areas. Relationship to the 2040 Guiding Principles: This requirement relates to Guiding Principles #3, #4 and #10. CC/PC POLICY QUESTIONS: 1. Should the City continue to use a Level of Service (LOS) based system for determining roadway functionality and for evaluating projects during CEQA review? 2. As part of SB 743, should additional factors be evaluated with LOS to determine roadway functionality for all users, including bicycles, pedestrians, and transit? For example, a multi- modal LOS is currently being developed by the VTA. Other cities in the Bay Area also analyze trip generation in addition to LOS. Community Input: Traffic and congestion concerns were recurring themes at the community meetings. 928 Action: This optional approach can be addressed through new policies and/or programs in the Circulation Element. E. Military Facilities Senate Bill 1468 (2002) requires the general plan land use element to consider the impact of new growth on military readiness activities. It also adds military installations to the list of locations that counties and cities must include in their circulation elements, and prohibits conservation elements from relying on military installations' habitat or conservation programs as mitigation measures for endangered or threatened species. Relationship to the 2040 Guiding Principles: This requirement relates to Guiding Principles #2 and #10. Action: This requirement will be addressed through new policies and/or programs in the Land Use/Community Design Element, Circulation Element, and Environmental Resources/Sustainability Element. F. Urban Water Conservation Senate Bill SB X7-X (2009) mandates water conservation targets and efficiency improvements for urban water suppliers. The Statewide urban water reduction target is 10 percent by 2015 and 20 percent by 2020. The General Plan will need to include policy language addressing these targets. In addition to mandating water conservation, this law also restricts communities from planning future growth that it does not have the adequate water resources to support Relationship to the 2040 Guiding Principles: This requirement relates to Guiding Principles #10 and #11. Community Input: Ensuring that future growth is adequately served by water and other public infrastructure was a common theme raised by participants during workshops and the scoping session. Action: This requirement will be addressed in the Climate Action Plan being developed concurrent with the GPA process. The Climate Action Plan will include a detailed strategy and policy framework to show how the City will meet local, regional and State water conservation and water supply requirements. G. Tribal Consultation Senate Bill 18 (2004) requires cities and counties to consult with California Native American tribes during the general plan update process for the purpose of protecting Traditional Tribal 929 Cultural Places. The Native American Heritage Commission (NAHC) maintains a list of California Native American Tribes with whom local governments must consult. Relationship to the 2040 Guiding Principles: This requirement relates to Guiding Principle #8. Action: City staff and the project consultants will consult with local tribes as part of the General Plan Amendment process. H. Sea Level Rise Executive Order S-13-08 (2008) directs State agencies to develop a climate adaptation strategy and consider a range of sea-level rise scenarios for the years 2050 and 2100 in order to assess project vulnerability and reduce expected risks, and increase resiliency to sea-level rise. The law established the California Climate Action Team (CAT) to coordinate statewide efforts to reduce emissions and adapt to climate change. Relationship to the 2040 Guiding Principles: This requirement relates to Guiding Principles #2 and #10. Action: This requirement will be addressed in the Climate Action Plan being developed concurrent with the General Plan Amendment process. The Climate Action Plan will include a detailed strategy and policy framework to show how the City will meet local, regional and State climate change adaptation targets. The General Plan will include a reference to the Climate Action Plan for consistency. Clean-Up Items City staff has identified several areas within the 2005 General Plan that are in need of updates, corrections, or clarifications. The following is a summary of these refinements:  Updating/correcting land use designations for various properties, as well as maps and tables  Updating the Historic Resource inventory  Including references to newly adopted or anticipated policies, programs, and plans, such as: o Climate Action Plan o Local Hazard Mitigation Plan o Storm Drain Master Plan o ADA Transition Plan o Proper disposal of organic waste o Cleaner outdoor areas o Low Impact Development (LID) stormwater measures o Drought-tolerant/native landscaping 930 o Extended producer responsibility o Wireless Master Plan update o Stevens Creek Corridor Master Plan Public Noticing and Outreach The following outreach efforts have been undertaken on this project to date. Postcards A postcard was delivered in February 2014 to all postal addresses in the City to announce upcoming dates on the GPA and Housing Element projects. The postcard also provides a brief description of the two projects and identifies the project website where interested persons may sign up for project updates and further notices. A previous City-wide postcard was sent in July 2013 announcing Community-wide Workshop #1 (discussed below). Website A website has been set up for the combined GPA and Housing Element projects at www.cupertinogpa.org. All technical reports, notices, and other important information are available at the website. Interested persons may also submit comments at the website. Workshops, Public Meetings, Commission/Committee Meetings, Stakeholder Meetings, Study Sessions, and Scoping Session  Community-wide Workshop #1 (July 18, 2013) - On July 18, 2013, the City hosted a community- wide workshop to kick off the GPA project. As discussed above, a City-wide postcard was sent to all City addresses, and the City’s website and project website also announced the workshop. In addition, e-mails were sent to all stakeholders and other interested parties.  Community-wide Workshop #2 (October 23, 2013) - On October 23, 2013, the City held a second Community-wide Workshop to discuss community ideas for future uses, design and mobility concepts along major mixed-use corridors (Homestead, De Anza, Wolfe, and Stevens Creek) and within the Vallco Shopping District. E-mails were sent to all study area stakeholders, Community-wide Workshop #1 participants, and other interested parties. The City’s website and project website also announced the workshop.  Other Public Meetings – The City also held the following additional meetings which covered essentially the same concepts from Community-wide Workshop #2: o Follow-up meeting for interested Cupertino residents on December 5, 2013 o Meeting with the Chamber of Commerce on January 29, 2014 o Annual meeting of the Cupertino Neighborhood Block Leaders on January 29, 2014.  Commission and Committee Meetings – City staff introduced the GPA project before certain City Commissions and the Cupertino Chamber of Commerce’s Legislative Action Committee (LAC) in order to expand awareness of the project, receive feedback, and answer questions. Staff presented the project at the: 931 o October 2, 2013 Teen Commission meeting; o December 6, 2013 and February 7, 2014 Legislative Action Committee meetings; and o January 15, 2014 Bicycle and Pedestrian Commission meeting  Stakeholder Meetings – Meetings with key neighborhood representatives, organizations (including the Chamber of Commerce and VTA), property owners in the study areas, etc. were held from May 2013 through February 2014.  Planning Commission Study Session and Open House (February 19, 2014) – See background section. As discussed above, a City-wide postcard was sent to all City addresses, and the City’s website and project website also announced the study session and open house. In addition, e-mails were sent to all stakeholders, past workshop participants, and other interested parties.  City Council Study Session (March 4, 2014) – See background section. As discussed above, a City-wide postcard was sent to all City addresses, and the City’s website and project website also announced the study session. In addition, e-mails were sent to all stakeholders, past workshop and study session participants, and other interested parties.  Notice of Preparation (NOP) – On March 5, 2014, the City posted a notice of preparation (NOP) on the project website and sent it to public agencies and interested organizations to solicit comments on the scope and content of the EIR. The last day for comments is April 7, 2014.  EIR Scoping Session – On March 11, 2014, the City held a scoping meeting to discuss the environmental review of the combined General Plan Amendment and Housing Element update project. The meeting provided an opportunity for the community to comment on the scope and content of the EIR. As discussed above, a City-wide postcard was sent to all City addresses, and the City’s website and project website also announced the scoping meeting. In addition, e-mails were sent to all stakeholders, past workshop and study session participants, and other interested parties. The following table summarizes the noticing for the April 1, 2014 joint study session: Notice Agenda  Email sent to all study area stakeholders, prior workshop participants, and interested parties signed up through the project website  Citywide postcard sent to all addresses in the City  Posted on the City's official notice bulletin board (one week prior to the study session)  Posted on the City of Cupertino’s Web site (one week prior to the study session)  Posted on the project Website (one week prior to study session) Next Steps The goal for this study session is for the Council to collect public input and provide comments on the major policy concepts. These comments will be used to develop policies and programs in the Draft General Plan, which is anticipated to be released for public review in Summer 2014, around the same time as the Draft EIR. An open house will be held in Summer 2014 when the Draft General Plan is available. The Planning Commission and City Council is expected to formally review the Draft General Plan Amendment in Fall 2014. 932 ____________________________________ Prepared by: George Schroeder, Associate Planner MIG, Consultant to the City of Cupertino Reviewed by: Gary Chao, Assistant Director of Community Development and Aarti Shrivastava, Director of Community Development Approved for Submission by: David Brandt, City Manager Attachments: A. Revised Concept Alternative Diagrams B. Retail Strategy C. Draft 2040 Community Vision and Guiding Principles (excerpt from Concept Alternatives Report) 933 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, CA 95014 CITY OF CUPERTINO REGULAR PLANNING COMMISSION MEETING APPROVED MINUTES 6:45 P.M. OCTOBER 14, 2014 TUESDAY CUPERTINO COMMUNITY HALL The regular Plannin g Commission meeting of October 14 , 2014 was called to order at 6:45 p.m. in the Cupertino Community Hall, 10350 Torre Avenue, Cupertino, CA. by Chair Paul Brophy. SALUTE TO THE FLAG . ROLL CALL Commissioners prese nt: Chairperson: Paul Brophy Vice Chairperson: Winnie Lee Commissioner: Margaret Gong Commissioner: Don Sun Commissioner: Alan Takahashi Staff Present: Assistant City Manager: Aarti Shrivastava Senior Planner: Piu Ghosh Asst. City Attorney: Colleen Winchester APPROVAL OF MINUTES: Minutes of the August 26 , 2014 Planning Commission Meeting: • Page 2, second paragraph, reference to parking stalls; change “low” to read “allow” • Page 10 second bullet point, change “occupational” to read “occupancy” • Page 8 heading that reads “Marriot Rep” should read “Hyatt Rep” • Page 10, two comments made by Chair Brophy, V ice Chair Lee, one of them says Vice Chair Lee and the other one below said Com. Gong. Change to include comment by Chair Brophy as well. • Page 9 and other references, change “Dr. Lun” to read “Dr. Lum” Motion: Motion by Vice Chair Lee, second by Com. Gong, and unanimously carried 5 -0-0 to approve the August 26, 2014 Planning Commission minutes as amended. Minutes of the September 9, 2014 Planning Commission Meeting: • Change spelling of names of the Apple repre sentatives who spoke at the meeting: Mike Foulkes, Jason Lundgaard Motion: Motion by Com. Takahashi, second by Vice Chair Lee, and unanimously carried 5-0-0 to approve the September 9, 2014 Planning Commission meeting as amended. WRITTEN COMMUNICATIONS: Noted distribution of written communication related to Item 3 934 Cupertino Planning Commission October 14, 2014 2 POSTPONEMENTS/REMOVAL FROM CALENDAR: None ORAL COMMUNICATIONS: None CONSENT CALENDAR: None PUBLIC HEARING: GPA -2013 -01, Z-2013 -01 Certification of Environmental Impact Report for a General Plan GPA -2013 -02, Amendment, Housing Element Update and Associated Rezoning; MCA-2014 -01 General Plan Amendment to establish citywide development SPA-2014 -01 allocations for commercial, office, hotel and residential uses and EA-2013 -03 development parameters for key study areas (including Vallco City of Cupertino Shopping district); General Plan Amendment for the 2014-2022 Citywide Location Housing Element as required by State Law; Rezoning of certain Parcels in conjunction with the citywide General Plan Amendment; Municipal Code Amendment to comply with State Housing Law and the Housing Element of the General Plan and other zoning code amendments for clean-up and consistency; Specific Plan Amendment to the Heart of the City Specific Plan related to maximum residential yield calculations and an updated map to conform to the General Plan. Tentative City Council hearing date November 3, 2014. Piu Ghosh, Senior Planner, presented the staff report: • Summarized the format of the presentation; the city’s planning consultant on the project from MIG will present the project, followed by staff’s recommendation and a brief presentation on the Environmental Impact Report (EIR) by the city’s environmental consultant Place Works, followed by staff’s closing remarks . Dan A msden, MIG: • Provided an overview of the General Plan Amendment process. The General Plan is the city’s guiding policy document; it is the overarching land use environmental sustainability policy document for the city required by state law and acts as the blueprint for future change and growth in the community. The focus of the General P lan is to est ablish a citywide vision for the future , supported by more detailed goals, policies, and strategies. All cities specific plans, master plans, and zoning requirements must be consistent with the General Plan; however, the General P lan itself does not improve or entitle any specific development project, property owners have control of when they wish to propose a project, and all final decisions on future development are manned on a case-by-case basis by other city staff, P lanning Commission, and/or C ity Counc il. In the last 1-1/2 years, through the General Plan A mendment process, we have had 22 community workshops, meetings, study sessions, with the various commissions in the city along with the city council. This extensive community input process has led to 3 different alternatives on future change in the city. • He reviewed in detail Alternatives (Alts.) A, B and C as outlined in detail in the attached staff report. Alt . A maintains the policies of the 2005 General Plan, with some increases to office and hotel development allocation by a modest amount, it does not increase residential allocation; it combines So. DeAnza and South Sunnyvale -Saratoga Blvd into one area. Alt. B assumes more development allocation and more growth than Alt. A, it is the modest growth alternative for a 25 year period from 2015-2040. Alt . C includes the highest amount of growth and development allocation. It includes enough future residential allocation to be consistent with Plan Bay Area through 2040. Similarly with increased development allocation it also envisions a redevelopment of the Vallco Shopping Mall into more of a shopping district or downtown for the city of Cupertino. 935 Cupertino Planning Commission October 14, 2014 3 Piu Ghosh, Senior Planner: • Reviewed in detail the State and Regional regulations and best practices, including the Climate Change, Land Use and Transportation; Complete Streets and Connectivity; Performance Measures for Mobility, and Housing Element, as detailed in the attached staff report. She then reviewed the community ideas and best practices, as outlined in detail in the staff report, including: community benefit, walking and biking to schools , parks and shopping; design of mixed use projects; Vallco Shopping District; and calculation of residential density. The way the Community Vision 2040 has been laid out is at the beginning a new chapter has been added called Planning Areas which divides the planning areas into special areas and neighborhoods. • Planning areas are already part of the 2005 general plan, whereas neighborhoods are partially discussed in the 2005 general plan. This chapter highlights the special characteristics in the community vision for each planning area and special areas are generally consistent with the 2005 general plan with minor changes as discussed. We also included major mixed use corridors where changes are expected in the future specifically in the heart of the city along Stevens Creek Blvd, Vallco Shopping District and North Vallco Park. Neighborhoods are mosty residential where everything will be preserved with improved connections to parks schools and other services. Piu Ghosh: Elements: • The Land Use and C ommunity Design section includes general policies as well as specific policies for the Planning Areas. It retains the policies in the 2005 general plan of urban design, connectivity, and pedestrian-orientated design. Further detail is contained in the staff report. • The mobility element contains policies with a vision to complete a “complete streets approach” which acknowledges the need for streets that are designed to be used by pedestrians, bicycles and transport modes , not just automobiles. It also incorporates mitigation measures that are identified in the EIR such as the implementation of the transportation impact fee to mitigate transportation impacts • Recreation and Community Services section primarily retains the existing policies while including principles of sustainability and master planning of parks and recreational programs. More comments are a part of the staff report. In the infrastructure element, policies have been consolidated from the land use and environmental resources sections it has been updated for content with current information and it also includes principles of sustainability and master planning. The sustaina bility section has been updated to comply with regional requirements and to reflect the city’s current policies in the Climate Action P lan . The Health and Safety section has been updated per new local and regional requirements. Balanced Plan Please refer to the staff report wherein the following was read into the record: Development Allocation; Economic & Fiscal; Office; Hotel; and Residential; Key Question 1: Development Allocation 1. What should the City plan for in terms of Development Allocation for office, commercial, otel and residential units through 2040? Community Benefits Program • As mentioned before the community benefits program came about through community input and is considered to be one key tool to help finance and achieve amenities that will be necessary to maintain the livability in the community and it also will maintain and increase the communities quality of life. This program will allow the community to get amenities in return for allowing additional specified 936 Cupertino Planning Commission October 14, 2014 4 heights within specified areas of the city. It also provides certainty as to what these additional heights might be, and where they can be placed. It would require development agreement which would mean the city would have to agree to the benefits and amenities provided. Changes to reflect this program have been incorporated to the proposed municipal code amendments. Key elements include (that are highlighted on the slide) include: 1. The proposed level of benefit is equivalent to at least 15% of the project valuation attributed to the increase in height (decided through preparation of a project proforma) 2. Projects must provide a ground floor retail component; and one or more of the following benefits: a. Transportation and Mobility Improvements b. Public Facilities (land or space) c. Senior Housing d. Public Art and Cultural Facilities e. Parks and Open Space Key Question 2: Community Benefits. 1. Should Cupertino have a Community Benefits Program? 2. If yes, does the Planning Commission have any revisions to : a. Value of the community benefits? b. Specific program items – retail requirement or other items? Refer to attached staff report Page 9 “Heights” wherein speaker read content into the record. Key Question 3 : Building Heights: 1. Does the Planning Commission have any recommended changes to the Balanced Plan heights recommended in the Special Areas? Refer to Page 13 of the attached staff report “Vallco Shopping District” wherein speaker read content into the record. At this point the city has two basic options: The first being to basically do nothing, which would not provide any incentive for a developer to redevelop the site. The other alternative would be to introduce more profitable uses on the site which include office and residential uses Key Question 4: Vallco Shopping District: 1. Does the Planning Commission agree on the Specific Plan and “town-center” concept with a mix f retail/entertainment, residential and office in the Vallco Shopping District? • The city has also received a request from Sandhill Development Property Company regarding the allocation of the Vallco Shopping District. The letter indicates that Sandhill is amidst acquiring the Vallco properties for potential redevelopment and in order to develop a feasible plan they would like for Vallco to be allowed a development allocation of 2million square feet and additional heights consistent will alternative C as reflected in this slide. The city’s retail strategist states that residential and office are highest and best uses for this site and because the BAE market study found that new demand of 2.4 and 3 million sq ft of office that up to 2million sq ft could be reasonable and necessary in make the project viable. Staff recommends that if the commission does recommend increasing the amount of sq footage in the Vallco Shopping District that the excess square footage be replenished in the city wide office allocation in order to retain some office allocation for the city wide pool. • Part A of this question is what should Vallco Shopping District allocation really be? 937 Cupertino Planning Commission October 14, 2014 5 There were other revisions made to the general plan including some land use designation changes at the PG&E and Mirapath Site to add commercial uses and other revisions have been made to ensure the general plan land use designation and zoning are consistent. The housing element is the only element that actually requires state approval and authorization. State law requires that the city plan contain a housing element and that it be updated on a regular basis established in the government code. READING REPORT • Please refer to staff report Pag 15, Housing Element Content Requirements which was read into record by presenter. • Please refer to staff report, Page 15, Housing Resources & Regional Housing Needs Allocation (RHNA) which was read into the record by presenter. • Draft 2014 -2022 Housing Element: Page 16 of staff report read into record by presenter. • One recommendation that has been proposed with regard to Housing Preservation Program the current housing preservation program for redevelopment of sites which cause loss of existing rental units requires that at least two of the following 3 conditions be met as identified on the slide. It also requires for the inclusion of a tenant relocation plan with provisions for relocations of tenants on site as much as possible and usually that has been interpreted to meet to CBGP? Requirements or greater. The staff recommends that the conditions that redevelopment may be approved be eliminated however to retain the requirement to provide mitigation for impacts on displaced tenants but to clarify the size of development in which such mitigation is needed, which is four or more units. HOUSING SITES The potential sites for housing elements was developed through public workshops study sessions with commissions and city council. The potential sites have been studied at varying densities in each alterative from minimal change in alternative A all the way up to Alternative C where the densities were studied at the developer proposed amounts and at the maximum densities proposed. HCD Criteria for site selection Considers the existing use on the site, the realistic potential for recycling of a site, the site size, the minimum site size that HCD requires is roughly 2 acres, and ownership patterns. Additionally the affordability factor of 20 dwelling units per acre at 85% of the maximum density whether a site meets that criteria or not. OTHER Other criteria both regional and local criteria that include identification of sites within ½ a mile of a VTA PDA, locate housing close to employment and activity centers. Verify whether they are corner lots with large frontages which are preferred so that the sites can be developed in an esthetic manner. Whether housing is needed as an incentive for redevelopment. Housing Element • The overhead presentation includes the sites that are being recommended. While 19 sites were studied in the EIR based on existing available housing element sites, sites proposed by property owners and based on developer interest and sites proposed by workshop participants only 18 sites were available for selection. This is because the largest property owner associated with one of the sites sent a letter to the city expressing their desire not be included in the housing sites inventory. The density and sites recommended in the balance plan are based on the goals listed in the staff report and read by presenter. • The rezoning of this properties that are recommended for inclusion has been structured so that zoning goes into effect at such time as the HCD approves the site as a housing element site. And should HCD not approve a site as a housing element site, staff recommends an alternative list be authorized 938 Cupertino Planning Commission October 14, 2014 6 for use. The Hampton sent in a letter and that in their letter they indicated that had expected to be studied at 100% of the density that they had proposed, but since HCD only allows85% of the realistic capacity at a site, they were not studied at the maximum densitity that they had expected to be studied. In order to allow the Hamptons the ability to develop the desired unit count the densities for their site would have to be at the low end, 76 dwelling units per acre, and at the high end 129 dwelling unit per acre. However the EIR did not study the 129 du/acre. So the bounding factor is the 110 dwelling units per acre that that site was studied at. • This slide represents the alternative sites in the priority that it is listed in the table. The last slide shows the low priority sites and scored low in the meeting criteria that were discussed previously, and are recommended to be removed from the alternate housing sites list. It should be noted that the density of these sites in Alternative A even if all of them are included that is including the low priorty sites, does not meet the upper end of the 25-40% surplus recommended to meet the RHNA. Key Question 5: Housing Element Sites 1. Does the Planning Commission agree on the Housing Element sites list and densities? 2. Does the Planning Commission agree on the Alternative Sites List and priority? Please refer to Page 20 of staff report wherein presenter read material from staff report. SUMMARY OF AMENDMENTS • There have been several other amendments made with regard to conformance with the Balance Plan. A change has been made to the General Plan in the residential density from gross acres to area of the lot, as a result of request from the Council. The zoning map has been updated to reflect Ge neral Plan conformance; changes to the Municipal Code have been proposed as a result of the housing element, including the density bonus ordinance. Also non-substantial clean up changes have been made to the Municipal Code ; and the housing element analysis found a constrictive development due to a requirement in the HOCSP where the residential density mixed use development is calculated net of the area dedicated to non-residential development, and as a result changes have been made to the HOCSP text to address this. Changes have been made to building plane line in the So. Vallco area along Stevens Creek Blvd . to reflect the General Plan recommendation. Steve Noack , PlaceWorks: • Provided an overview of the California Environmental Quality Act (CEQA), the state’s primary environmental protection law that requires that public agencies disclose environmental impacts that have physical effects on the environment as follows: effects found to be not significant, significant impacts, ways to mitigate or avoid impacts, effects that cannot be mitigated, and alternatives. CEQA does not dictate that the project approval or denial. • The EIR looked at a 2040 buildout horizon, because the General Plan is a large scale and long range planning document. The buildout of potential future development is based on the year of 2040 and the EIR is analyzed growth occurring between 2014 and 2040 which is a 26 year buildout horizon. It should be noted that 2040 is consistent with Plan Bay Area. As a program EIR this document addresses large scale long term projects encompassing a broad scope of physical development issues including General P lans, specific plans, master plans, and zoning ordinances. A program EIR analyzes full buildout scenarios that accounts for all development allowed under General Plan . The EIR allows for subsequent project level environmental review for future development to tier off the program EIR. Individual projects under the General Plan that warrant further analysis under CEQA are reviewed including identification of impacts and mitigation measures at time of project proposal. It should be noted that because we are looking at cumulative impacts over a long term scenario we are looking at some levels regional in nature such as air quality impacts and traffic impacts and those are factored into the impact analysis. To the extent feasible, where environmental impacts are identified, 939 Cupertino Planning Commission October 14, 2014 7 CEQA requires that impacts be avoided, minimized, rectified, reduced, eliminated, or compensated. CEQA also permits incorporation of mitigation measures designed to protect preserve and enhance environmental resources as goals policies and strategie s; in this case the General Plan include s goals , policies and strategies that help to address potential environmental impacts identified in the EIR. • The EIR looked at a full range of impact areas, found that there are no impacts or less than significant impacts in a number of areas; focus will be more on the areas where we did find potential impacts. The EIR did find there were a number of impacts that would be less than significant with mitigation and some were found to be significant and unavoidable, even with mitigation. The EIR carefully looked at a range of project alternatives and these mirror the alternatives in the plan itself. The majority of the impacts were less than significant or were able to be reduced to less than significant with the mitigation. However even with implementation of feasible of mitigation and compliance with mandatory regulations including General P lan policies, impacts to transportation and noise and air quality would be found to be significant and unavoidable at the General Plan level. Th e No P roject Alternative would be environmentally superior in this case because it would not allow for new development to occur beyond what is planned for the 2000-2020 general plan which would result in the least amount of development in the city and therefore reduce the consumption of renewable and nonrenewable resources and would place fewer demands on public service providers which would require new facilities and would also fewer roads sewer energy and water infrastructure improvements and would genera te less waste. However in accordance with the CEQA guidelines, if the environmentally superior alternative is found to be the CEQA required no project alternative, the EIR shall also identify an environmentally superior alternative among the other alterna tives. • In this case the next environmentally superior alternative was found to be Alt. A since less development would occur over the projected buildout for the plan itself. Each alternative was analyzed at the same level of detail independent of the proposed project and CEQA requires that the lead agency identify mitigation measures and alternatives in order to avoid or substantially lessen impacts, but they don’t always lessen the impacts to bring them below the significant thresholds. It should be noted that the recommended mitigation measures in the EIR would apply to all the alternatives that were studied and compliance with mandatory federal state and local regulations including both existing and proposed general plan policies designed to reduce environmental impacts. Six comment letters were received from public agencies, 19 comment letters from members of the general public; most of the comments did not pertain to the adequacy of the draft EIR; the city has received a number of late comments raised subsequent to the closure . Piu Ghosh: • The Development Allocation recommendation in the Balanced Plan are generally between Alts. B and C; however, the recommended heights are similar to or lower than those studied in Alt. B. The Balanced Plan provides a better balance of land uses than the proposed project which is Alt. C or any of the other alternatives due to the fact that the office/commercial to residential balance is better than that in Alt. B which has the lowest VMT of all of the alternatives studied in the EIR. It will continue to have significant unavoidable impacts where traffic, air quality and noise even after incorpor ation of all feasible mitigation measures. • Staff requests that the Planning Commission review the key questions posed in the presentation for its recommendation to the City Council. • Said Alts. B and C allow them to meet the housing element for this cycle; because in Alt, A you would have to select all the sites that were studied in the EIR in order to meet the housing element and it would not meet the higher recommended number of units with consultation with HCD. Vice Chair Lee : • Even though Alt. A is before us , it wouldn’t meet the housing element; they cannot select Alt. A as an alternative . 940 Cupertino Planning Commission October 14, 2014 8 Aarti Shrivastava: • Alt. A by itself yes, you could modify the alternatives in terms of height and other things; it is correct in that if Alt. A was chosen, the sites that were selected at the densities selected don’t get up to the 1400 number being recommended. Adjustments to the housing element sites would have to be made. For an alternative just to meet the housing for this cycle, in terms of the RHNA number, it is 1002 residential units; but based on our consultant’s recommendation, it is 1400. If the number is not met, when cities have residential allocations, and they are not common, they are seen as growth restrictions and there have been lawsuits such as Pleasanton and other cities where people or advocates have seen these as being restrictive; our recommendation is if you meet Plan B area you would keep the resident allocation system. Another alternative is to take out the allocation system entirely and just allow the densities allowed in the General Plan. If you kept the allocation system, staff recommends keeping it but meeting Planned Bay Area so that at least if anyone had to securitize our General Plan we could say we have met regional targets. What we have done is in order to manage growth in the future we are recommending some changes to the General Plan so if mixed use sites are not housing element sites, residential can become a conditional use and that way residential development on such sites can be scrutinized more carefully. Vice Chair Lee : • Does that mean, one of our handouts and maybe consultant said before, that in order to meet our Planned Bay Area we would have to increase residential to 1,405 units. Does that hold true. If we add residential units of 1,400 it will meet the housing eleme nt, it will meet the Planned Bay Area thing. Aarti Shrivastava: • We have said generally 1,400 so we don’t have to get that specific. Said it would meet the RHNA allocation but it wouldn’t meet the Planned Bay Area target; in this case it would be 4,400 through the 2040 period, which is three housing elements worth; it is a 25 year plan. We are recommending that we do meet Planned Bay Area. It is not a mandate, but it could Chair Brophy: • It would not be an issue if we removed the residential allocation Aarti Shrivastava: • That is an option, we could remove the allocation system entirely and let development happen based on the densities provided in the General Plan. We have always had an allocation system which is why we had one in here, continued with it; it doesn’t have to stay. • Said the most effective way to conduct the discussion and question and answer portion of the hearing, in the past a multi layered approach, e.g. the Green Building Ordinance was followed; wherein it was recommended that the Commission take straw votes on each question; and then decide on the final recommendation. Staff has organized the discussion in the form of questions to make it easier for the Commission to discuss it is the Commission’s decision on how to best move forw ard. Com. Gong: • Asked staff how they can ensure if they go with the housing allocation, a mixed use project actually built out the residential units? Could they propose it or could it be allocated, as we know it doesn’t always happen. Aarti Shrivastav a: • The city has the ability to say this is a housing element site and we want a mixed use project; there is always that ability because it is a discretionary permit if they come in with non-residential uses . 941 Cupertino Planning Commission October 14, 2014 9 Com. Gong: • How can we ensure that if we recommend the allocations we recommend tonight, how that those projects do go forward if the developer chooses to. Aarti Shrivastava: • Said the city has control over two things; zoning the property and reviewing pro ject when it comes forward; through that process the city has the ability to manage the approvals; beyond that it is up to the developer to decide what they build or don’t build and it depends on the economy. What is under the city’s control, we have an approval process that allows the city to c ontrol it. If they came in with a proposal to build a mixed use without the residential allocation, the Commission might say this is a housing element site and we want to see a mixed use project with residential. In choosing the recommended site, said the y go through a criteria including HCD criteria and other criteria discussed over time with City Council, Planning Commission and Housing Commission. Com. Gong : • Why did staff choose to go with similar or lower heights than were recommended in Alt. B? Aarti Shrivastava: • We heard a lot of community input; partly there was a lot of consternation about too much height in the city; we wanted to be thoughtful about where that height could be located; that is why we created the nodes and gateways and we created a community benefits program so that if additional heights were given, the community would get something. We wanted to balance economic and fiscal growth and stability with the community’s concerns about height and the character of their city. Com. Tak ahashi: • Referring to the discussion about allocation vs. density, he said he wanted to clarify that they currently have an allocation system and are looking to replenish that allocation based on the preferred sites, etc., but the other option is to abandon allocations and strictly go based on dens ity at specific preferred sites. Aarti Shrivastava: • Said the allocation system referring to the option to remove the allocation system is only for residential, not for non-residential; the city has always had an allocation system to say this is how many units you could build in a given period . The other option is to not have an allocation system because the density can control it; we already have density controls. Presently for non-residential we don’t have FAR controls which is why we have the allocation controls. In the residential we have the belt and the suspenders, you don’t need both if you choose not to. Based on a discussion with the EIR consultant, our assumption in the project is that regardless of whether there was an allocation system or not , for residential projects we would develop based on the Planned Bay Area, which is about 4,400 units over the 25 year period; that is the assumption that we have made and it is a reasonable assumption since it is based on some regional targets. Com. Takahashi: • With regard to the 15% community benefit calculation, I understand we would allow more height with a community benefit and the valuation of that is 15% of the added va lue associated with that height. What was the general thinking behind that concept and how do you actually go about calculating the true dollar amount with that added benefit? Aarti Shrivastava: • Thought was given and programs were researched; there isn’t a discussion of what that value needs to be, it talks about some community benefits and it lists things and in the end it is similar to the concept 942 Cupertino Planning Commission October 14, 2014 10 of horse trading ; but we felt was not a good idea because we wanted some level of certainty, which is why we have a number. Other communities had a per square foot cost but that really doesn’t keep up with the economy and market at the time, so we felt the best way to do it was using market valuation and perform an analysis as a fairly true and tried common method when you look at things. • The ordinance for public art is based on a percentage of the performa; our own ordinance recognizes that, which is why we felt it was the best way to w ork. We had a discussion with our consultant who said this is the range you want to stay in, added benefit; which is why we came up with it and we wanted to be specific about the amount, very specific about location of where these heights could be, and ve ry specific about what those additional heights could be; we didn’t want them to be open ended. Com. Sun: • The entire planning is based on the city’s future growth, including population and economy. Is there any particular number to share with the public? Aarti Shrivastava: • We can look at those numbers and give you the increase in population estimated with each alternative. Com. Sun: • Yes, but that’s the fundamental for our entire planning, next 25 years. Second question; when we allocate the land use commercial/office/residential, what is the base to our located office, the square footage … one million, two million, three million .. for me I want to know where the base, how you calculate that one; a lot of business is going to move there. Aarti Shrivastava: • A market study was done that said that the market based under analysis can support so many square feet of office, so many hotel rooms, so many residential units and that number is generally consistent with Alt. C. The future economy could support the kinds of numbers that were studied in Alt. C. In terms of staff’s recommendation , staff wanted to recommend more of balanced plan that balanced office and residential, so our numbers are lower, our office numbers are more consistent with Alt. B. The numbers were studied in the market study and they say that the economy can support over the long term about so much office in the city. Dan Amsden: • The EIR did look at what it would take to mitigate those impacts that were found to be significant and unavoidable and there were a number of reasons specifically for each intersection as to why it was found that the mitigation was not feasible ; and it would range from the need to take private property to expand a intersection; there are jurisdictional issues where some intersections could not be completely controlled by the city of Cupertino. It was outside their jurisdiction therefore they could not implement the mitigation measures and there were some issues where it would affect operation of the intersection as well, so you are building intersections that don’t look at pedestrian and bicycle movement to the same degree and that would be found to be unfeasible. Com. Sun: • Question about the community benefit, we know Cupertino is famous for its school system, we cannot touch school issue; any way when city working with new developer , consider the new development will generate extra traffic and put into the contract part of the mitigation for the entire city traffic including the school impact is possible. 943 Cupertino Planning Commission October 14, 2014 11 Aarti Shrivastava: • Because of state law the mitigation that developments pay to schools is the impact fee; they already pay the impact fee; so we cannot add more mitigation in the EIR, however, the community benefits program has a cash in-lieu option and should the Council want to avail themselves of the cash in-lieu option, they can choose to give it to another entity which could include schools. It can be done through a development agreement; it won’t be done throu gh conditions on the project; it is more of a development agreement issue as part of a community benefit program. Com. Sun: • For the community benefit program there is only condition about the height. Can we put another criteria when the city is working with developers to put in the community benefit there? Aarti Shrivastava: • As part of the EIR, once they know what the final plan is, they will draw up a transportation plan for the entire city that implements all of the mitigations, and then projects will be charged a transportation impact fee so that they would pay that amount so the city can go ahead and make those improvements. In the case of large projects they will mitigate their own impacts; there is a plan to do that; set up a program and a fee to do citywide mitigation. Com. Sun: • Next issue is regarding allocation of the housing element; for the first six we put the priority to meet the requirement; for the next level it is an alternative; the first year of priority the six locations the developer didn’t develop. Aarti Shrivastava: • Said no, the idea is to get through HCD; if HCD is happy with the first six sites and they have no questions, then that is the final list; if they have questions on some sites or they feel like certain sites should be taken off, that is when we go to the alternatives list; our recommendation is we just have enough sites to meet that 1,400 amount and once that list is finalized by HCD, we will bring it back to the Commission and Council for final approval and those are the only sites that will be housing element sites. The Commission and Council can choose to add more sites than required if they wish. Com. Gong: • If the HCD approve the six that are recommended, none of the other sites are able to build residential units. Vice Chair Lee : • No. 14 and how it doesn’t meet the affordability criteria and what can be done about that. The Villages were previously recommended as high acceptability. Aarti Shrivastava: • The villages has a density of 20 dwelling units per acre and if you then go down to 85% of that capacity you are down to 17 units; you need to meet a minimum of 20 in order to qualify as an affordable housing site; which is why the Villages don’t meet the affordability criteria. It could be rezoned, although increasing the density of the Villages was not analyzed. It was a site in the last housing element; at the time it had 13 sites and a good part of them met the affordability criteria; now there are 6 sites and Glenbrook Apts does not meet the affordability criteria. Reviewed the HCD Criteria for Site Selection, Other Criteria for Site Selection, Housing Element Sites, and discussed the details of Table 3 in the staff report. 944 Cupertino Planning Commission October 14, 2014 12 Aarti Shrivastava: • Defined Balanced Plan, which signifies the preamble to the discussion to try to balance the city’s future economic fiscal stability with a need to maintain the community character. It also speaks to the balance of land uses when comparing office to residential, trying to make sure they make regional targets so it hits a lot of issues. Chair Brophy: • In the EIR when looking at our residential labor force and number of jobs that were within the city of Cupertino, there were more jobs located within the city, as there were people living in the city and working. That was done before, and did not reflect the fact that last year we approved 3.5 million sq. ft. for the Apple 2 campus. My point is that when we approved the apple 2 campus last year we knowingly went to a very un balanced split between residence in the labor force living in Cupertino and the number of people who will be working within the city limits. Aarti Shrivastava: • Yes, and the balance plan tries to bring the housing more into balance. Chair Brophy: • We are putting in housing because the state requires us to, but the proposal, what I am trying to focus on is the office recommendation of the Balanced Plan where you recommend adding an additional 2 million feet in addition to the 540,000 feet that are already in the general plan. The question is that 4 people per 1,000 which is a reason able estimate for the office space, 2 million feet is another 8,000 emplolyees , in a city where we will be vastly out of balance or will be once the Apple 2 campus opens up, how do we call a recommendation that has 10,000 more employees coming into a fully built out city; how does that become “ balanced” Aarti Shrivastava: • If you put it that way it is not completely balanced but we are looking at trying to provide a balance between get the units and it’s semantics but if you were to completely say we want to house e very person who is employed in the city, then you are right. Chair Brophy: • Said he was concerned that when they approved the Apple 2 campus, they knowingly accepted a substantially out of balance set of numbers between the number of people working within the city limits and the number of people in the city who are in the labor force. They are now volluntarily suggesting that they throw in another 8,000 employees who will come into the city every day through some means, mostly via private car. Said he was befuddled why they are going even farther to the imbalance and calling it a “balanced Plan”. Aarti Shrivastava: • Said she could not respond; but felt they tried to balance a number of city obje ctives. Chair Brophy: • Asked what were the benefits/objectives that staff sees from putting in another 10,000 jobs into the city, given their limited ability to add housing? Where do we envision all the jobs being created in Cupertino; where will all the people live? Aarti Shrivastava: • Staff felt that by meeting Planned Bay Area the city met its regional obligations in terms of housing. In terms of job growth, Planned Bay Area does see some job growth in the city; it doesn’t see zero, so 945 Cupertino Planning Commission October 14, 2014 13 they felt that somewhere in that range was generally acceptable. If you compare the 8,000 jobs they are adding with the population increase that would be accommodated with the housing. She said they were doing well, and are in the 9,000 range not counting the 14,000 working at Apple. Chair Brophy: • Part of the RHNA and one of the issues I have made in one of the study sessions, was that there is no part of planning theory that says that all cities have to exactly balance their residential labor force and the number of jobs within the city. The problem is that every other city in our neighborhood is doing exactly what you are proposing tonight which is adding vast new office complexes. Aarti Shrivastava: • Regionally there is a lot of office being added. We were trying to be a little more responsible. Chair Brophy: • When we talk about sustainability and meeting SB375 and we are worrying whe ther an apartment complex is on Stevens Creek or a few blocks away, that has nothing to do with sustainability but where people live does have a great deal in terms of vehicle mile travelled. Said that one of the most important issues facing Cupertino in the upcoming election was the traffic problem in the city; would they agree that the more development that is approved in Cupertino, the worse the traffic will get, which is a significant and unavoidable problem. Aarti Shrivastava: • Said if they look at the data and traffic analysis, it is question of degree and the degrees don’t change so much; primarily it is the regional growth and the economy that determines the traffic. In our No Project alternative where we don’t envision growth beyond the current General Plan, there is still a significant unavoidable impact as far as traffic, noise and air quality and the differences aren’t much between that and the other alternative, so it isn’t vast degrees of change. The alternative isn’t a whole lot better, so we tried to balance the issues. Com. Lee: • Even though the units are already spelled out, whatever gets approved, the number of units, if 600 units get approved for this parcel, then can Council say we will approve the 600 units but we wanted all studio apartments or one bedroom; does it have to be in a mix and how restrictive can it be later or does it need to be in the housing element? Aarti Shrivastava: • Said they don’t talk about the type of units generally, they try not to be too restrictive but in the past they have been ame nable to looking at smaller units; they have talked about trying to house the workers and their needs. Com. Gong : • As part of the community benefit plan could we add an incentive to a developer to build a certain type of unit that we would pre fer or that would be attractive? Veronica Tam: • Said in order to get to their objective of having some of the smaller units, it is a much better approach to incentivize that by providing community benefits of a range of housing. Perhaps they could put in the provision that if they include a larger proportion of smaller units they would get some kind of incentive . It is much better to incentivize that vs. restricting it to only studio units because you would probably run into fair housing situation where you are precluding families and restricting it to just studio units. 946 Cupertino Planning Commission October 14, 2014 14 Chair Brophy: • On any given site in order to meet some of the goals for very low and low and moderate income housing, can we condition the housing element allocation for a given site that it have a given percentage of very low or low income housing? Aarti Shrivastava: • Said she thought cities had done that; Cupertino has not done in the past and is something we can ask our consultants to help with. We try not to combine the community benefits with affordable housing because then you start getting into density bonus issues and we figured we would keep that separate but if the city wanted to designate sites for affordable housing, can they do that? Veronica Tam: • Said they normally don’t like to do that because there are only six sites and if you designate a particular site for affordable housing projects, you have to commit to having funding to make that project into an affordable housing project because you cannot require a private property owner to commit to doing that particular site and turning into an affordable housing project. Chair Brophy opened the public hearing. Chair Brophy noted that because of the late hour the meeting would be continued to the next meeting, tentatively scheduled for Monday, October 20th. Jeff Pauls e n, Randy Lane: • Clarified that he was speaking as a private citizen and not in his role as Vice Chair of Parks and Recreation Commission. Said he was excited about the direction the P lan was taking; the Balanced Plan is a lot of what they worked for over the years a nd it includes a lot of wonderful elements. Highlighted some points; said they should not be afraid of height; height can be made attractive; no one wants to live in the urban canyons of Manhattan; nonetheless certain architecture elements, certain setbacks as the building steps back to a higher height, can be attractive; they should not limit themselves to a certain height. • He suggested there be more coordination between the various types of planning, the EIR talks about transportation levels of service dealing with only traffic, whereas the Balanced Plan talks about incorporating newer requirements for considering other levels of service such as bicycle and pedestrian. It is important to make sure all the different elements of the planning process agree with each other although not always possible because of various regulations and stipulations. • Said he would like to put in a good word for the trees, which can add a number of elements to a city, not just aesthetics but add to property value s which translates to increased tax revenue; they can relate to decreased urban runoff; and also improve air quality both through production of oxygen and the filtering of particulates from freeways; and also can reduce the urban temperature; the problems with trees is they don’t fit in one place; a lot of times they are considered a Public Works issue; in another sense they are an economic development issue because they do increase property values. I would encourage that to be a part of the plan and keep up the good work; you are doing a great job. Jennifer Griffin, Rancho Rinconada resident: • Said it was the second housing element since the Rancho Rinconada neighborhood annexed in 2000 from the County and brought 5,000 residents in to Cupertino. Said it was a large complicated snowballing project; with a General Plan Amendment mixed in with a housing element, rezoning housing element sites which all seem to be shopping centers. She said she was now a No Project Alternative type of person and didn’t like where the Plan was going. She does not like the One Bay 947 Cupertino Planning Commission October 14, 2014 15 Area Plan, it doesn’t fit into Cupertino’s future; it means other people who don’t live or work in Cupertino are planning its future; most of those people end up in other areas of the state but have no comprehension of what it is to be in the South Bay or the Peninsula. She said No Project Alternative and no community benefits; this thing keeps seeping back in every time we have changes to the R1; it is like let the developers run whole hog and let them build as high as they want because what we are going to do is, we give them; in fact the term was density bonuses, every time we go into this, this thing creeps back in; we are going to let them have reduced, they can go higher if they pay more money , they don’t have to have as much parking, they can have higher density on the housing; let’s don’t go there. Also, I am confused as it sounds like Vallco is on the list for a housing site; how did that happen? When did the Oaks go on? I heard Marina is gone on too; does that mean that Vallco is being considered for a housing element site; that is outrageous. Could you please verify that; that means that we are rezoning that entire center for housing; I am concerned about that, plus the Oaks. Let’s don’t go there. Carlene Mat chniff, Irvine Co.: • Said that Irvine Co. submitted a letter, stated that they appreciated the job staff has done, but they also have to look at some of the criteria that HCD places on the idea of redeveloping sites and one of them is to provide enough units to give the incentive to redevelop. I think we have to look at the economics of that. In the case of the Hamptons site we have 342 units existing there and to come in at the numbers where staff is it doesn’t make sense to invest in an assessment district for the Wolfe interchange for example and all of the other public improvements and community benefits, the park fees, school fees, everything that goes along with a development of that magnitude and we want to offer a first class development, first class architecture, class A apartments, we want to come in and provide Cupertino with an excellent project. In order to do that we need about 400 more units added to the numbers that where staff is to make sense out of this. I wanted to go over a few of the benefits for the public to really know what we can offer at this site. It is rather unique in that it is adjacent to the new Apple spaceship campus as you mentioned earlier, it is going to provide a lot of employment to Cupertino and we can offer housing that people who live there can walk to work; they can bicycle or walk to work; it is very connected; it is sustainable and it would be built to a high level of green standards and reduce the VMT for those people who live there and those people in the region who want to live a little closer to Cupertino. In addition, we told you last time we were here that we were working with Apple on some language for a General Plan Amendment; we have reached that agreement and have given that to staff, as well as we have provided a cooperative agreement for the redevelopment of the Hamptons to Apple for their review; so currently we are working on a cooperative agreement that would be a private party agreement that would guide the development, deal with issues such as security and privacy and those issues that are important to our neighbor. We have also hired an expert landscape architect to look at the issues of interface between the properties so that we ca n insure their privacy, incorporate some of our large redwood trees that are 70 to 80 feet already on the site and keep those and keep them in the plan. In addition, we will be contributing to the Wolfe interchange and we have been told by staff that some form of assessment district is going to be created that will take in that area; we and going to contribute to that and we know that from the get-go. In addition we are not in the Cupertino School District, but are in the Santa Clara School District so we do not impact Cupertino schools in terms of students in Cupertino schools. We are working out a mitigation agreement with the Santa Clara School District; and have begun an analysis of that and begun communication with them. • She pointed out that the Irvine Co. doesn’t sell their assets; it is a 150 year old company, which stays in the community and builds in the community; they are the landowner, the developer and the property manager; they guarantee their brand will stand behind the project and will deliver a high quality project. When allocating units across these sites, you really need to understand; are they going to be built in the future; are they really going to help that jobs housing balance because I do have an out of balance situation here as you mentioned, and there are other cities now that are saying maybe we 948 Cupertino Planning Commission October 14, 2014 16 should build housing closer to the job so that people can get off the freeways and spend more leisure time with their families and I think we can offer that in this case. Chair Brophy: • Said as he read the Irvine letter, it said that if offered 344 units in the housing element, that simply is not enough to make the project work. Ms. Matchniff said it would be 686 with their existing 342; in order to scrape those units and start over it doesn’t make economic sense; they would have to have about 400 more. Said essentially at 344 they would have to drop Irvine Co. from the housing element. Carlene Matchniff: • Said they wouldn’t have to drop them, if that was their choice. She said at this time redevelopment would not be feasible given the 344 figure. Chair Brophy: • Said given the letter, it would be hard to imagine if HCD would see the letter or hard to envision them accepting this as a housing element site . Aarti Shrivastav a: • Said they would have to have a discussion. Albert Wa ng, representing Marine Foods and Marina Plaza: • Said they have provided service to the community for over 30 years and are aware that with the addition of a new hotel and the Apple campus, they have to update their site . Their vision is to have a mixed use village and want to bring back as much retail space as they currently have; and have Marina Foods return as an anchor tenant to provide continued support to the other retail stores and community. He felt their site was located along the corridor of Stevens Creek; if they make a deal at the center for residential and retail activities , the residents can generate the foot traffic needed to support the Heart of the City retail activities. • Said it was important for them that the project be a success, and have brought the Dahling group on board as their architect to design a project which they will blend adequately with both the original corridor and also along Alice Drive. They will work with the city to make their project the best ever for everyone in Cupertino. Said they feel their location is an ideal site for housing in Cupertino , located at major crossroads of Stevens Creek and DeAnza Blvd. which is the financial area of downtown Cupertino. The Marina site is adjacent to both the major transportation corridor and retail corridor in the city. The Marina commuter has easy a ccess to Hwys. 85 and 280 and the bus stop in front of Marina goes to the new Apple 2 campus to the Caltrans station and as far as downtown San Jose. They will better serve the community with outdoor seating area, beautiful landscaping and retail offering that will be for all the citizens of Cupertino. He said the Marina site fits all the criteria that a city is looking for regarding the housing allocation, and they hope to bring something special to the Heart of the City. Chair Brophy: • Commented that Marine Foods is a successful grocery store; one of the concerns of putting housing in the Marina area, is will that undercut the ability of the grocery store to serve the current customers. Albert Wang: • Responded they have adequate parking and will have underground parking also. Glen Simmons, Dahling Group: • Architect with Dahling group; has done mixed use projects in and around Cupertino and has been working with Marina Plaza people to develop some conceptual designs for their site. Their site is a 949 Cupertino Planning Commission October 14, 2014 17 perfect one for housing because it already has a supermarket, banking office, restaurant and support services on site; they plan on trying to maintain those and adding residential to create a complete urban village. According to Balance d Plan it looks lik e there could be 200 units allocated for that site; they have looked a t studies which include underground parking and above ground parking garages which would free up the site and make for a walkable neighborhood and create some community open space and plazas. They are listed currently as an alternative site; would like to be on a recommended site because they are located in HOC and makes a good fit for the housing element. They are highly motivated and would like to turn a 60s shopping center into an urban village. Chair Brophy asked Mr. Simmons: • In your conceptual work so far is it possible, one of our concerns is maintaining strongly performing shopping centers and not giving them up for housing; in your opinion and experience, do you believe that you can add housing and still have the same kind of strength that the center currently has? Would it work productively in terms of customers having ingress and egress and still want to shop there? Glen Simmons : • Said yes, they are currently looking at about 50K square feet of retail which is about what is there now , and they want to maintain that amount of retail on the site. Yes, not just retail; there are some food services there; dry cleaners, eye glass store, etc. It is not just direct retail, it is also services that will help the people who are living there. Com. Gong : • Questioned Mr. Simmons, he is working with the owner Mr. Wang now; if the property were not placed on the housing element site would he continue with redevelopment of the plaza in whatever capacity he is envisioning it? Glen Simmons : • Said the question would best be answered by the owner; he is interested in trying to do something different with that site. Albert Wang: • Responded that without the housing, it would not be economically viable for them to pursue. Glen Simmons : • Currently for their design, they are using a module of 2 bedroom units, it could range from studio to 3 bedroom; using a general module now because it is very conceptual. Claudio Bono, representing DeAnza Properties and Cupertino Inn: • Said they planned to build a hotel next to Cupertino Inn; 300 rooms, 4000 square feet of meeting space; underground parking; valet. He thanked staff for their recommendation of 90 feet for the hotel; but said they were requesting 110 feet instead of 90 recommended by staff, in order to make the commitment of 300 rooms as well as over 4000 sq. ft. of meeting space, convention area. It would be a full service hotel and are asking for the Commission’s consideration on it. Com. Gong: • Asked staff what was the special consideration for including convention meeting spaces and what is the criteria for it to be determined convention rather than just meeting spaces? Aarti Shrivastava: • Said they did not get detailed about it; but those areas were along Wolfe Rd by Cupertino Village and Cupertino Inn. It was specific request for hotels; said the recommendation in the area of Cupertino Inn 950 Cupertino Planning Commission October 14, 2014 18 the base is 45 feet 60 with retail and going all the way up to 90 if there is a hotel or major convention center for community benefit. Claudio Bono : • Said the meeting space can vary to the convention being requested; the convention would be part of the plan that we currently have over 5000 square feet of meeting space which means it would allow 400+ people within those rooms which currently the largest one is the Cypress Hotel which can only commit up to 200 to 225 , which would add an added value to the city of Cupertino. The new hotel would generate hotel taxes revenue for the city of Cupertino as well as over 100 new full time jobs. Robert Mc Kibbin: • Said the process doesn’t reflect the wishes and desires of the Cupertino citizens; it mainly reflects the desires and wishes of the builders , developers and property owners. There is blackmail going on too; 3 developers and owners got up and spoke about it; Marina is talking about 208 housing units; keep in mind that Rosebowl reflects 204 housing units; they are looking at taking a structure that size and putting on that site. There is Cupertino Inn, now at 45 ft. elevation they can build; their proposal is 90, they don’t want that; they want 110, otherwise they will go home and somewhere else. Said Irvine Company’s density is where it is and the proposal from the city was a lot higher and they won’t accept that; they want something bigger, otherwise they will pull out of the process and I think Com. Brophy showed the letter that said if you are proposing this and we don’t give it to you, then they will walk out and we will have to go back and redo our housing unit. • Look at the audience, this is not an amendment to the General Plan; it is a major revision to the General Plan and Cupertino’s general public is not at the meeting; the process is so convoluted and complex, it has mainly been taken over by the developers, etc. It was a better process 10 years ago when we went through the housing element. Going out 26 years and talking about that is unimaginable; most will be gone in 26 years. If they go with the proposal of a 4500 housing units that is like taking Rosebowl at 204 units and building a Rosebowl at least one a year for the next 26 years; that gives us perspective and keep in mind the city of Cupertino essentially built out; a speaker said don’t worry about height and density; you do; people are already talking about the concrete canyons of Cupertino; that is what we are developing now. • An example is go to the Rosebowl and Vallco and see what is going on; at meetings the citizens got up in regards to Vallco and were dead set against housing at Vallco; dead set against anything but retail and what we do is get the proposal that talks about 600 housing units of Vallco which the citizens of Cupertino do not want and who knows how much office over there; the idea when the citizens had the chance to speak was to keep that 100% retail. You talk about maintaining retail space; it is not going to happen; the retail is going to disappear as already happened with Promethius, it went from 21,000 sq. ft. retail down to 8,000 which is an example of what will happen if this is proposed. • Said his recommendation for the housing is disregard the 26 units and the 4500 units , disrega rd the 1400; the recommendation is 1002; go with that and plan what we have for the next 5 or 10 years, not out 26 years with this example; same thing with regards to office space, etc. they can come back to the City Council and Planning Commission and ask for exceptions to the General Plan if there is a need for higher density and more square footage. It is getting ridiculous where they are giving 2 million square feet here, 3 million here, 100 million here; Cupertino is built out. Com. Sun: • Said he expected that more residents would have attended the meeting, and expressed frustration why more people were not attending. Do the residents not care anymore; is the plan too complicated? Robert McKibbin: • Said they came to the Planning meetings where they voiced their opinion and thought they would be heard; instead they weren’t he ard. The Commission came back with a report from staff with high 951 Cupertino Planning Commission October 14, 2014 19 density and it caught many people by surprise ; the plan that they are talking about is huge . They don’t understand the process and don’t understand how huge this is and what a major impact it will have on the city of Cupertino the next 10 years. It is about 4500 housing units over that time period; one Rosebowl being built for the next 26 years; every year; where is it going to go? Com. Sun: • He said his understanding was to fix the problem, get more people involved in the city’s development; only thing that they can improve on is go through the procedure, extend the notice from 300 to 500 feet or more. Will it draw more people to the meetings? Robert McKibbin: • Said it is a breakdown in the process; there are major revisions to the General Plan, and they are not amendments, and somewhere in the process there is a breakdown where you and staff have not reached out effectively to the citizens of Cupertino in regards to the major impact it will have on the city, schools and traffic. It is hard at this point because it goes from you to the City Council on Nov. 3; how will you reach out to the public between now and Nov. 3? He said he did not have the answer but knew it reflects a major breakdown in the process if you can’t get the public out here for this major impact on the city of Cupertino. • There was a discussion on how to get the people to the meetings. Mr. Mc Kibbin said at the earlier meetings, one of the options for Vallco should have been to keep it retail; that wasn’t given as an option when the meetings were held; that is not comparing it to what the citizens really want, and many of the citizens at those meetings said they wanted 100% retail. It is not brought up at the meeting. He said it was a frustrating process, the citizens feel they do not have a say in it. Mark Tersini, K T Properties : • KT Properties is a commercial and residential development company in Cupertino for over 25 years ; the land was purchased in late 70s with visions of office environment; building built in 1984; have been around the Stevens Creek Corridor and in and around the Oaks Shopping Center all that time; Oaks Center is in contract and currently in escrow scheduled to close shortly. He commended staff for their work on the General Plan and Housing Element update. They are currently in e arly stages of considering what to do with Oaks Shopping Center and how to redevelop it to its highest and best use. It is a commercial center comprising 55,000 sq. ft. commercial/retail space, some successful and some not in the center over the years . Said he viewed the Housing Element as one that could help energize the center, a mixed use opportunity for not only viable retail but housing and potential for hotel or office use. Said they have a long way to go before any formal application to staff and look forward to working with staff and the Planning Commission and City Council for the ultimate redevelopment of the property. Beverly Bryant , Ph.D : • Disclosed she was working on behalf of KT Properties. Congratulated staff for putting the program together; it is a huge commitment, a GPA and EIR, including all of the different elements. Other communities in the Bay Area are well aware that the growth in California in the next 20 years is going to be incredible; but the growth in the Bay Area is going to be significant; 2.1 million people was projected in addition in 2010 and the growth and jobs in that same period of time will grow by a million or over a million. When we are talking about growth we have looked at Cupertino tonight and Com. Takahashi had some great charts about what the percentage in the city would be, Bay Area 30% if it is 22% in Cupertino it is going to be somewhat less than the overall Bay Area, but I feel Cupertino will feel the impact of growth and jobs and need new housing no matter what it wants to do as will every other city in the Bay Area. • She urged the Commission to be as forward looking as possible and really think about the future planning because it is going to happen, and the Alt. C meets 100% of the targets and looking at that 952 Cupertino Planning Commission October 14, 2014 20 alternative it is realistic. The people who have done the work on the housing particularly as well as the office and whatever else might come with that, really have considered the possibilities. The Oaks sit e does lend itself , it is on a transportation corridor that’s very important; it is really within bicycle range of Bubb Road and the Apple building is on that facility; also it is in bicycle range of crossing the bicycle bridge and getting onto t he campus on the other way so there is opportunity for transportation in that way as well as the transportation on a major corridor of this community. The property lends itself to building high and using the heights and perhaps an increased height just because of its proximity to this freeway and putting buildings that are not going to be impacting a lot of neighbors in that particular area is important. Cupertino has an opportunity to be a leader not only in jobs but in housing, and we hope that you will do that. Phyllis Dickstein, resident: • Said she agreed with previous speakers Jennifer Griffin and Robert McKibbin. One of the reasons more people don’t turn out at the meetings is because in Silicon Valley people work until 11 p.m. and the other reason is people who are not retired cannot attend approximately 22 meetings. It is hoped that the process is not just some type of fig leaf to pretend to have consultation when all the decisions will simply be taken by the Planning Dept., Planning Commission and C ity Cou ncil who may have had some ideas to begin with as to what they wanted,. There is a certain disconnect as pointed out by a speaker between what the residents want which is not Alt. C development and what planners tend to want. The one thing that most struck me trying to read online today, there is one thing fundamentally I disagree with, which is that in order to preserve all the other neighborhoods in the city, those of us who live in the Heart of the City area, in the areas of Cupertino or Wolfe Rd. or DeAnza are going to be the sacrificial lambs. Why is it that all development has to be concentrated in one area and even now try to drive on Stevens Creek and getting out onto Blaney; the traffic problem is not going to go away and I think that concentrating development in one area and trying to develop at Level C or even between level b and C is overdoing it. Todd Dewell, Kimco Realty: • Property owners and operators of Cupertino Village at Wolfe and Homestead Rds., have been working on redevelopment at the site for 7 years and opened the parking garage last week, signifying the end of the first phase. It took 7 years because of the recession, to get through and get to a point where they could realize their project they first saw 6 years ago. • Commended staff for their work and trying to foresee where Cupertino will be in 10 to 20 years and they are pleased to have been a part of it; and leaving options for the future with heights, density; gives them an opportunity to see what they can do with their site 15 years down the road. Said they support staff and will continue to do so. Chair Brophy: • Cupertino Village is an extremely productive center and one of our concerns has been to give additional zoning to productive shopping centers that might undercut their role as a shopping center; maybe from the owner’s perspective might work out better if you could do mid-rise offices or apartments or things like that but from a city perspective we are concerned about protecting, not doing things that would undercut the viability of the existing center. Todd Dewell : • Kimco operates shopping centers, and does not veer from that; they would look at a mixed use project. Said the existing tenants may change over the years but Ranch 99 being the anchor is the mainstay of that center and that is going to stay in any kind of development they look at. They may go to a low - rise or mid -rise, adding some office, looking at potential housing but the core retail will still be part of the center today and in the future. 953 Cupertino Planning Commission October 14, 2014 21 Chair Brophy closed the public hearing and declared a recess. • Regarding community benefit dis cussion; one of the questions posed to the Commission is, should community benefit be allowed to extend heights of specific projects and the community benefit be funded by the benefit that the developer gains from those heights? Funding community developme nt does allow community improvement; said he was hesitant from the standpoint of some of the heights getting to be too high, which is a concern. Said in general he supported community benefit. Chair Brophy: • Said he was skeptical, have some experience and some knowledge about how community development benefits have worked in other communities and the answer is what happens inevitably with the best of intentions going in is that you wind up having discreet negotiations between would-be developers and the professional staff and with individual City Council members, and then what happens when an agreement in principle is reached and the matter is offered to the city, everybody is shocked when the residents rise up in anger. If you are in a community such as Cupertino where the number one issue is traffic, by very definition adding more building space makes the problem worse and no community benefit can change that. Said he felt in the interest of openness and transparency they should just say no to it. Com. Gong: • Said in general she felt that the community benefit can be structured such that they can incentivize the developers to provide a community benefit. Said she did not support the cash in-lieu of contribution; it is an easy out to just pay for not providing the benefit and putting the burden on the city to provide the benefit. The developer should take the responsibility if they are getting the benefit and also there should be a provision in the development agreement that the benefit is maintained with the property not with the owner if it changes hands. The subsequent owner must maintain the community benefit at the level as dictated at the time of the development agreement. Vice Chair Lee: • Said she did not support the community benefits program; the project should benefit the community itself. Chair Brophy: • Summarized that there were 3 votes in favor of community benefits but more formal polling will be done. He cautioned some developers who are anxious to start spending the few hundred thousand dollars of their money on the expectation they will negotiate a community development concept with the staff, there is a long history in this area of them finding out that what the staff felt was a good idea and what Council members privately told them was a good idea turned out to be very different when the people showed up. • Commented on the issue Com. Su n was raising with Mr. McKibbin about the reasons why no community members were at the meeting, other than interested land owners. He said the General Plan and housing elements are not treated by the average citizen as a real project because it is a conceptual thing in most minds. A couple of years ago there was a request to add 80 or 90 units at Biltmore, and there were about 15 unhappy neighbors here; tonight it is a request for 600 units at Vallco and there are no other public commenting other than Jennifer Griffin. He said he would guarantee that when an application comes forward 2 years from now the room will be packed with very unhappy re sidents; only the future Council will have to state that the decision was made in 2014; and that goes for all the sit es. Given that the Cupertino citizens don’t focus on conceptual issues such as the General Plan and housing element, it is all the more incumbent on the Planning Commissioners and for the City Council as well to make sure that decisions are made are not ones that will come back to bite the community. 954 Cupertino Planning Commission October 14, 2014 22 • Said he has been a Planning Commissioner for almost 7 years and felt he has had good personal and professional relationships with staff and as a result of that it is painful for him, although not always obvious, that when he was questioning them earlier, he was doing it not because he doubted their skills, integrity, but felt the direction that the General Plan Amendments are going and to a lesser extent some of the housing element decisions are fundamentally wrong, which will lead the community to a deterioration of the quality of life. He said there was a phrase in one of the conversations where somebody said that the purpose of things like community benefits are to maintain the livability of the community. He said he would rather not approve projects that screw up the livability of the community and then ask for something back to make it not quite as bad; and to the extent that Cupertino is a suburban community, it doesn’t have a core downtown like San Mateo or Palo Alto where you have a traditional downtown where it could be created to more of an urban type setting, Cupertino is defined by two six lane strip highways; and doesn’t have the ability to be an urban community; and to the extent that they start injecting urban type densities into the community , certainly unnecessarily in the case of additional office space but even in the case of residential, we don’t have to go in the direction we do, it is extraordinarily important for us to stand up for the citizens who aren’t here tonight who I am confident don’t support this kind of urbanization. Nothing in the public hearings I have attended indicated that is the case; now occasionally you can frame questions in a way that give you the answer you want; what benefits would you want in exchange for higher density? When you frame it like that, people come up with their Christma s list. • Mr. McKibbin said that people are not looking for high density, they expect us to maintain, to recognize that buildings get old, they need to be changed; there will be locations that can be improved in zoning but the residents are counting on us not to approve the kind of changes that staff is recommending. Again I just want to re -emphasize that I have the highest regard for staff, in my professional career I have dealt with probably 3 dozen or more planning departments throughout California and o ur Planning Department is well above average in terms of competence and response to citizens, but in this case the philosophy they are proposing is simply wrong. Com. Takahashi: • Directed the following statement to Chair Brophy: You have had a lot of opportunity to express your strong opinion on this which is a good thing, but the rest of us have been silent on the whole general element with regards to where we stand on this, and there is an element of equal time needed. I want to start with Vallco because from a resident’s perspective I think there is a very widely held opinion that the current course of that shopping center is not acceptable; it hasn’t been for quite some time and keeping it as a retail only is not a viable solution in terms of any large scale redevelopment of that center, and to make it viable does need other elements to make it succeed; and the staff worked very hard in terms of trying to assess what would the community vision of Vallco look like in a successful environment. I think it is important for the Vallco project that mixed use, adding residential and adding office to that site is imperative for it to succeed, and so I definitely recommend we go that path for the Vallco center. Hotels have been pretty quiet and I wanted to express my opinion on the hotels; I feel like it is a significantly under -serviced area for the community and that it poses especially Paul to your point in terms of adding office when you add office it tends to attract business travelers to the region and the business travelers need a place to stay; when they stay in the city it generates revenue for the city; it generates revenue in terms of taxes but also they eat near the hotels they stay in, so there is further revenue that comes to the city with the restaurants. I haven’t heard any dissenting opinions on the hotel rooms but that is to be heard, but I fully support the decision with regard to the staff and the hotel room allocation. • With regard to the Balanced Plan and the staff’s attempt to generate this plan that really balance is a very strong word from the standpoint of trying to weigh varying opinions into a solution that in this case you have got effectively nobody happy with it in terms of developers wanting more and reside nts wanting less, so what is that balance that can be achieved. I commend staff for their efforts in trying to reach that balance because two competing factions really generate different requirements and 955 Cupertino Planning Commission October 14, 2014 23 demands of the staff; I think from the standpoint of the outlook that staff has taken, I think it is the right outlook. I don’t necessarily feel qualified enough in terms of my own knowledge of the areas and the heights to make a strong opinion about the heights other than the maximum heights that are currently specified a 160 feet really seem to stick out as a very tall building in the city; likely the tallest building we would have if allowed to go to 160 feet; so that is something I would be concerned about. Clearly heights are sensitive near residential and the plan looks to mitigate that as best as possible, I think that is positive. We already have an established height at Vallco that is driven by the movie theater and allowing heights over that should just be evaluated based on what does that look like, and what does the site look like from a clearly economic viability standpoint. Sandhill is going to want to maximize those heights and so I think it is to Chair Brophy’s point setting those guidelines in the General Plan and not having it discussed further, I think is a little risky. • Marina seems like it is a good site with regard to its location; if it indeed can be a well architected site and planned with access; so I am not sure why it didn’t make the cut, especially having a willing owner is helpful and it is in the Heart of the City and it could fit the model and allow for achieving some of the goals we have. The challenge that everybody has had with this plan, or that I have had with this plan is the horizon is very far, 2040 and what I have tried to imagine is what can be done to really keep the elements of the city we hold dear, so neighborhoods and schools are clearly high on our list of things we want to maintain; and I think the plan as written attempts to address that; the reasoning for growth is clear from the standpoint of you have to allow some level of growth. I think Beverly Bryant was quoting some in terms of population and office growth, those are real numbers that will occur around us and as a community making sure our plan takes into account what those are and what we can comfortably work in and plan for and be at points of access and minimize impacts as best we can is important. I am a proponent of controlled growth. If we try to choke it off completely, that has ramifications downstream that are not healthy for a city. There has to be some level of growth just to maintain a city’s vibrancy. • The densities that are the housing and the housing densities proposed, my preference would be between B and C in terms of the number of units because of the impact on population and the impact on schools, but I feel like the growth as planned in terms of the locations and densities are where the growth needs to happen to facilitate access to where the jobs are. With the office growth doing things to promote housing near those offices is in the best interest of the community. I look forward to seeing how this plays out and how the city balances the needs of the residents and property owners and the community. We have the opportunity to continue to make Cupertino a great place to live and a better place than we have now; the staff is really focused on applying urban development in a way that will give us something resembling places to gather vs. the fragmented things we have now. A lot of the development that has occurred lately is in line with that and will promote better access and a good place to live. Com. Gong: • Said in line with what Com. Takahashi said, the only constant is change, and so to have a forward vision, a strategic vision to manage the change in how we want it to be, to manage and create a vision of incorporating the growth while keeping the essence of the city we love is necessary; we can’t have a vision that is three years out that’s even 8 years out, 2040 vision, it will be here sooner than we know. It is a vision, not set in stone; it’s not said that these are the elements, these will be built. It is a well thought out plan that they hope to present. It is difficult to look out at 2040 and the elements of it, but we have to know that there is change and she said she felt the deve lopment is somewhere in between the zero growth voices and the Alt. C voices . • Said she has spoken to residents who are attending some of the meetings that staff has had as well as those not attending and there is a lot of appetite for redeveloping Vallco; no one wants to see a dying property there; how it is developed has varied opinions; there is zero growth, zero change we have heard, and there is total forklift, mow it down and start over. Said she felt it is in between; we know it has to be revitalized; it can’t remain as is. Deny it and we can’t move ahead without addressing it and 956 Cupertino Planning Commission October 14, 2014 24 without having a forward vision for it; it is only in our best interest so that we can maintain the city and essence of the city that we love. Com. Sun: • Just want to clarify, you prefer Alt. B or just zero grow th. (Com. Gong said no, there are elements in all of it). Said he wanted to addres s procedure, public involvement which is very important. Said he was surprised that more stakeholders were not present at the meeting and he was deeply concerned on how to get people involved with conceptual discussion. He suggested for future meetings they give the public more time and more intense outreach to emphasize how important it is so they can get more public involvement. • Said he respected Chair Brophy and was surprised that the study session for the General Plan has been going on for so long. We can at the beginning express some of concerns at the beginning and the general philosophy may be wrong but at this stage we can say you prefer zero growth; most people in this room for the business they want to make money, drive property value s up, probably go to Alt. C. Most of the citizens in Cupertino want to maintain the balance , the urban life; they want to enjoy the city services but want to keep quiet neighborhood; we need some balance. • He said Cupertino is in the center of Silicon Valley; and they cannot simply ignore the development; people flood in regardless if there is a standard of zero development or not; students come in to the schools, for city staff or Planning Commission we still think about something happen ing in other jurisdiction s which is why he strongly supports community benefit for bringing extra funding to the city and solve the traffic issue. Vice Chair Lee: • Said she was concerned about jobs and housing imbalance in Cupertino and just looking at recent developments and approvals, really concerned about Cupertino’s future, fairly concerned about air quality, traffic that comes along with more jobs in Cupertino; do share Chair Brophy’s opinions on that. Said she did not support a lot of increase in office; as a health care provider there are a lot of propositions she has strong opinions on and are talking to residents; residents are asking why there are so many housing developments; said the citizens count on the commissioners to look out for their best interests. • The residents are concerned about the quality of life issues and she feels it is her responsibility to represent them. It is difficult to sit on the Planning Commission discussing additional housing units since it is not okay with the resident, which is a reason she does not support a lot of increase in office. Said she does not support any increase in office squares; does support some hotel rooms, supports 1,000 hotel rooms; residential because of a lot of public outcry and residents’ concerns and traffic issues. Said she was supportive of increasing enough residential housing to meet the housing element. Chair Brophy: • Said he agreed that Vallco is a terrible center and will get worse; there is a secular decline in brick and mortar shopping and two of the three anchors are clearly in a secular decline. Any revitalization of that property will require some other uses. Said he was not opposed to the concept of housing at Vallco, but extremely opposed to putting units into the housing element at Vallco because once you put it in the housing element, you have basically agreed on the number of units and it is just a question of details. Said he was willing to put in strong language about the need for Vallco to be revitalized with a mixture of uses containing a strong retail component, but would like to see rather than give a commitment to a developer, see a process something similar to what was done with Sandhill on the Main Street project where they worked as the community with the developer and discussed what the economic realities facing the developer were; but also recognized that there were limits as to what the citizens were willing to accept. Said he hoped they could separate a statement of intent for Vallco as opposed to making a commitment. 957 Cupertino Planning Commission October 14, 2014 25 Com. Gong: • Asked how they address the HCD requirement. Chair B rophy: • We are going to have to find 1400 units elsewhere; we will find a way; it will not necessarily be the priorities staff had but a lot of the ones they set were based on preferences based on city policy not on state policy. We have to respond to state policy but we can pick a different set of priorities as the advisory citizen committee, but I understand that we have to find replacement units. Chair Brophy: • Said he could respond as he had been here since the last housing element; the answer is No, we had 12 or 13 housing elements sites last time; one was developed for housing; approving housing element sites does not mean that they will all be housing 8 years from now. Said there was a letter from Sandhill properties saying that staff recommendation of 1 million sq uare feet at Vallco is not sufficient for them to redevelop it and they would like to have 2 million square feet. Vice Chair Lee: Stated zero earlier. Existing General Plan which is 540,000 Said she would be open to taking the 523K of that currently in major company and making it part of a general pot. Com. Gong: • In the near term A, 500,000 sq, ft, but we are looking out for 25 years, not just for 8 years ; support the 2 million extra to get 2.540 million; there is no specifics that 500K must be built in the next 8 years; this is just a broad stroke 25 years . Said she would support it being one big pot on all the numbers Com. Takahasi: • Said given the time horizon he was looking at something in between A and B; would accept B but a little apprehensive as to the total, for lack of coming up with something in between for now, Alt. B. Chair Brophy: • Said he would prefer to agree with Com. Lee and keep it at the existing 540,000; however to get 3 votes I will vote with Com. Sun and go for Alt. A with the hope that Com. Lee would consider casting the deciding vote for A rather than B. Aarti Shrivastava: • Said it could be dropped; no ramifications other than units with conditional uses might bump up against a General Plan Amendment issue; but residential uses are conditional based on staff recommendations. Our feeling is if it had to be a number it shouldn’t be such a restrictive number that we make ourselves vulnerable; we meet the regional target. It would be saying we met our regional target; I think that would be a much more defensible number; the alternative would be to take it out. Said they could choose to have it; they have recommended keeping it or taking it out. Com. Gong: • Said she would prefer to remove the cash in -lieu contribution and also to have verbiage to enforce the community benefit in perpetuity of the property rather than owning with the owner; Chair Brophy: • Said t ypically the community benefit is a one -time project; it is not ongoing. 958 Cupertino Planning Commission October 14, 2014 26 Com. Sun: • Three conditions; one is no cash; the service remains attached to the property, continuity regardless if it transfers ownership; my proposal is to put a transparency procedure into the negotiation about the community benefit; that means it is not the Council or city staff’s power to negotiate the community benefit; it is going to have a public hearing procedure. Is that possible ? Com. Takahashi: • Said he was changing his vote to No. • Said they had not touched on the topic of community shuttle which he felt was somewhat pervasive in a lot of the community outreach meetings. It is a concept that other cities have tried and no idea how successful they have been. Is there a reason that the smaller contract with the VTA couldn’t be worked as opposed to creating all this infrastructure; has it been looked at? Aarti Shrivastava: • The Public Works Department has had conversations in the past with the VTA, but staff could have another one with them. They likely look at why would they change the current program and what is in it for them in terms of profitability. If a case can be made for it, they may want to do it. It would require conversation with the VTA and it has not yet been done. The topic of heights and densities is deferred to the next meeting . OLD B USINESS: None NEW BUSINESS: None REPORT OF THE PLANNING COMMISSION: Environmental Review Committee: No report. Housing Commission: No report. Mayor’s Monthly Meeting With Commissioners: No meeting. Economic Development Committee: No meeting REPORT OF THE DIRECTOR OF COMMUNITY DEVELOPMENT: Written report submitted. ADJOURNMENT: MOTION: Motion by Chair Brophy, second by Vice Chair Lee, and unanimously carried 5 -0-0 to adjourn the meeting to the continued Public Hearing on October 20, 2014 at 6:45 p.m. • The meeting was adjourned to the continued public hearing on October 20, 2014 Planning Commission meeting at 6:45 p.m. Respectfully Submitted: /s/Elizabeth Ellis Elizabeth Ellis, Recording Secretary 959 CITY OF CUPERTINO 10300 Torre Avenue Cupertino, CA 95014 CITY OF CUPERTINO REGULAR PLANNING COMMISSION MEETING APPROVED AMENDED MINUTES _____________________________________________________________________________________ 6:45 P.M. OCTOBER 20, 2014 MONDAY CUPERTINO COMMUNITY HALL The adjourned Planning Commission meeting of October 20 , 2014 was called to order at 6:45 p.m. in the Cupertino Community Hall, 10350 Torre Avenue, Cupertino, CA. by Chair Paul Brophy. SALUTE TO THE FLAG ROLL CALL Commissioners present: Chairperson: Paul Brophy Vice Chairperson: Winnie Lee Commissioner: Don Sun Commissioner: Margaret Gong Commissioners absent: Commissioner: Alan Takahashi Staff Present: Assistant City Manager: Aarti Shrivastava Senior Planner: Piu Ghosh Asst. City Attorney: Colleen Winchester APPROVAL OF MINUTES: None WRITTEN COMMUNICATIONS: Letter from L. Wang, Marina Foods Letter from Stevens Creek Office Park POSTPONEMENTS/REMOVAL FROM CALENDAR : None ORAL COMMUNICATIONS: Robert McKibbin, resident: Said he read the report relating to Vallco, and read terms like active community gathering place, regional destinations, town center style project, mixed use pedestrian oriented; have heard a lot of these terms before and don’t get regional retail locations out of these projects; basically get high rise office buildings and large parking structures and hotels, not the retail that these kind give an impression of. Mr. McKibbin stated that Vice Chair Lee pointed out at one of the meetings about how she was dissatisfied with Main Street because it was essentially mainly office space and hotel and not a regional retail location. He continued by stating that for the Vallco area, the same language is being used and there is discussion about 600,000 sq. ft. of retail which is fairly fine; 600 housing units is being proposed to be developed at Vallco. It must be kept in mind that Rosebowl is 200 units, which means that it would mean putting three Rosebowls in this location along with everything else. Also 375 hotel rooms are being planned; not to mention the proposal for a million sq. ft. of office space. Vallco is not a regional retail location like Stanford or some of the others in the area; it is different. 960 Cupertino Planning Commission 2 October 20, 2014 He went on to state that Chair Brophy and Com. Sun discussed the reasons the public was not coming out to the meetings and engaging; part of the reason is that it is hard to grasp these numbers and visualize it. He used the example of Rosebowl because it is built already and it is a big structure with 200 housing units . If this information was presented in that light to the public and citizens adjacent to Vallco , one would have 200 people out to the hearing talking about it; but because people cannot visualize what is being proposed, they are missing what is happening. Also mentioned that this is one project; there are dozens of projects throughout the city for which a zoning change and change to the development criteria is being considered. Cupertino is built to capacity; there is a carrying capacity for everything and what appears with the numbers under study is capacity is being maxed now and with these new proposals over-extend it all. There are several alternatives written in the program; one of them is to leave the zoning as is especially at Vallco and he would recommend that because if the developer wants to add these things, they can come to the Planning Commission and City Council and say they want to change the zoning. This is doing it backwards; they are saying they want all of this without giving a concrete proposal as to its location, what it will look like, etc. Said he zeroed in on Vallco because he went to a lot of the planning meetings ; the public was there, and in his opinion, the vast majority of the public do not want this type of development; the vast majority of the citizens said they wanted retail and not a huge housing development, no huge offices, nor a huge hotel area. Peggy Griffin, resident: Said she attended study sessions where residents said they did not want housing or office, but keep Vallco retail; and now both are going to go in. This General Plan is supposed to be an amendment but it feels like a rewrite, and when looking at what has already been built going down Stevens Creek and Tantau across the street there is a nice office building set back with trees and grass; across the street it is in-your-face concrete and on Blaney and Stevens Creek it is the same thing. The Biltmore was a nice apartment complex but what has been added looks tacky, cheap and concrete and not wanted in Cupertino. They need retail, big spaces, not little shops; Target and Whole Foods have been successful. Please keep the big chunks of retail; they are needed. Jennifer Griffin, Rancho Rinconada resident: Said she was concerned about how large the General Plan Amendment is getting. There are supposed to be 7 sites, not housing sites, under the General Plan that were to be looked at for possible redevelopment; then under the housing element part umbrella of this project, there are a number of sites that are under the domaines of the state. Said she was not sure which one of those Vallco was on; still confused as to how they ended up on the housing element and would like to ask questions or have someone talk about when there are properties under the housing element. Properties are going into the housing element as they have a number of properties here; There are shopping centers, retail sites, etc., some apartment complexes; said she assumed that as of January when the housing element is adopted by the state, at that time those properties are rezoned at the higher density. How would that affect Vallco; how would it affect their property value; does that mean that henceforth Vallco would have a housing element number on it? What does that do to the property value? There are a number of sites: Marina, the Oaks, and shopping centers; if DeAnza College came in and decided they wanted to put their property up as a housing element, would that mean the college would get rezoned as higher density housing? Could someone explain that? When one has a site as big as Vallco, the public needs to be informed of what is happening; the public has put years into studying and understanding Vallco even when it was under the Redevelopment Agency and are still struggling to understand it, nobody wanted apartments at Vallco. Chair Brophy: Asked staff to respond to some of the points raised, the role of the housing element is vs. the GPA 961 Cupertino Planning Commission 3 October 20, 2014 Aarti Shrivastava, Assistant City Manager, responded to concerns raised by three speakers relating to the role of the housing element vs. the General Plan Amendment: The General Plan was started because there were about 7 applicants who had General Plan Amendment requests and the idea was not to do them separately because that is one of the complaints the city received from the public when one gets projects one at a time; the idea was to combine all of them to understand better what the impact would be on the entire city. At the same time the city got its final housing element numbers, and as Com. Brophy pointed out, this is a state requirement where every city is required to plan for a certain number of units and because they came in at the same time, they were combined because that would give everybody a good sense of the changes that would have to be made in the community. That is the genesis of why this project has all the elements it has. At the previous meeting, the Commission took straw votes on development allocations and on the community benefits and there are the other issues of heights, housing element sites, densities and the issue of Vallco. CONSENT CALENDAR : None PUBLIC HEARING 1. GPA-2013-01, Z-2013-01 EIR, General Plan Amendment, Housing Element, Rezoning (EA-2013) GPA -2013-02 Municipal Code Amendment and Specific Plan Amendment. MCA-2014-01 Recommend certification of final EIR and adoption of findings, SPA-2014-01 statement of overriding considerations and MMRP to the City Citywide Location City Council. Continued from the October 14, 2014 meeting City of Cupertino Tentative City Council hearing date: November 3 , 2014. Aarti Shrivastava, Assistant City Manager, s ummarized results of the October 14, 2014 meeting discussion/action: Citywide development allocation: 5-0 straw vote to eliminate the residential allocation numbers Commercial: No change to staff recommendation Hotel: 5-0 straw vote to add 1,000 hotel rooms to the hotel allocation Office: 3-2 straw vote to pick Alt. A, 500,000 sq. ft. additional and to eliminate the major company office allocation pool so they could be combined together Community Benefits Program: 3-2 straw vote not to have one. Aarti Shrivastava: Said there were three issues that called for the Commission’s preference on which one to take first; the heights issues, the housing elements sites issue, and Vallco. Heights Vice Chair Lee: What is the height the Hamptons wanted? Aarti Shrivastava: Said 85 was the tallest height; received letter from Hamptons that having consulted with Apple they were okay with the recommendation of the balanced plan. The current height limit is 60 feet. Relative to heights, she said they can help determine what heights they want; the discussion of heights in the heights map at least in the balanced plan Alt. A, B, and C reflect the densities on the housing element sites as well. If the Commission was interested in going with a certain density on a certain housing element site, staff could help with what height would be needed to build that density. They 962 Cupertino Planning Commission 4 October 20, 2014 would go back to the height issue when doing the housing element; they could decide they wanted to do the housing element first. Chair Brophy: For sites that are potentially housing element sites but also could be used for non-housing purposes, they can cover the Hamptons; can they have different sets of heights? Aarti Shrivastava: Said they could; some of the sites in the study area; at least 4 areas where housing was not proposed are the Stevens Creek office site, City Center site, Cupertino Inn as well as the Kimpco Hotel site; those are 4 sites in the study areas where their first choice was not to put in housing; they wanted to put in either office or hotel, but they had requested height limits to be increased. That’s an example of sites where there wouldn’t be housing element sites but the height issue would still come up as an issue. Said they currently have that as density, if the Commission wanted that as heights that could be done. Housing Element Chair Brophy: Said he already expressed his concerns to staff last week, his views are different of what priorities would be; the issue was clearly raised by the three speakers tonight and revolves around Vallco. He said he felt that in order for Vallco to be redeveloped, it has limited future as a purely retail facility, and no matter how much they may want that, it has clearly been declining. There are universal declines in brick and mortar retail and most importantly two of the three anchors there have serious declines in their business nationwide, so it’s not going to survive. Some sort of mixed use would be planned but Vallco should not be in the housing element site. He strongly urged that they discuss later about how best to handle it in the General Plan Amendment , but on the housing element he would not want to see any units assigned to Vallco. Com. Gong: One of the speakers asked for clarification if a site is on the housing element , how would the current zoning be affected? Aarti Shrivastava: Said some sites don’t currently allow housing, e.g., the Oaks, so the zoning would change to put in housing; some sites already allow housing and in that case they would be permitted to build housing; it all depends on the sites. The city would have to change the zoning to make that happen; that is part of the mandate. Com. Sun: What was the Housing Commission’s recommendation for sites? Piu Ghosh, Senior Planner: The action item that the Housing Commission voted on is looking at the priority of the sites as opposed to specifically recommending sites as housing element sites; they looked at the criteria that staff and HCD had identified and based on that there was a recommended sites list; the sites were prioritized based on that and the Housing Commission agreed or recommended that the Planning Commission use that criteria to prioritize the sites that would have been recommended. The Housing Commission agreed with the priority listed, but they weren’t asked to finalize the list of sites. 963 Cupertino Planning Commission 5 October 20, 2014 Chair Brophy: Said he had concerns about the criteria for site selection; the ones that HCD sets were locked in and those are logical ones from a regulatory agency but he disagreed with some of the ones that have been added by the city. Said he felt criteria that are unreasonably eliminating sites located on major transportation routes with access to transit or within half mile of VTA priority development area and also located near higher density housing in close proximity to employment and activity centers. Said his concern with these criteria is the reality in Cupertino of the extreme low use of public transportation by people who live anywhere in the town; the only people who ride the bus are those who have no access to cars. Santa Clara County is a sprawling suburban location and to the extent we would say that, i.e., the Biltmore on Stevens Creek Blvd. is a better location because it is in the transportation corridor; however, in fact a maximum of 1% or 2% of the people take the bus; we should not choose locations on Stevens Creek over locations that are not on Stevens Creek. As a general planning principle it works fine in places where you have substantial use of public transportation to work, but he said he didn’t see how choosing one location over another in town would change the use of public transportation. Aarti Shrivastava: Said they recognize that presently the public transit is not at a level that makes it easy to use; however, VTA has plans for certain areas. The Commission doesn’t have to agree; staff is fine with wherever it is put in. Said all they have to go by are the plans that VTA has because the city doesn’t plan public transportation but they look at the planned routes. Stevens Creek/DeAnza is a VTA priority development area ; if any transportation improvements are going to come in, that’s going to be the location; no other part of town is going to have it. The second idea is and this may or may not be of interest to the Planning Commission; transportation state funding is moving more towards giving cities funding for infrastructure and planning in those PDA’s; so the city over the years may stand to gain some additional help in building infrastructure in these areas rather than in any other areas. The final reason they did this is one of the big community concerns with housing was school impacts. While these are not specifically supposed to be considered, areas where housing has been proposed are most likely going to be areas that have the lively town center formats that will be more attractive to young workers or active seniors and that helps with the school impacts. It doesn’t mean the Commission has to agree with them; the Commission is free to recommend other sites. Said to the extent that every one of these sites has multiple ownerships, it becomes difficult to convince HCD (State Department of Housing and Community Development ) that these are going to happen in the next 8 years; therefore, they would recommend a balance of sites to go with a strong list to HCD that meets HCD criteria because time is an issue. Once they forward the draft it takes about 60 days to respond and because time could run out, they want to go in with a good list. There is not a lot of time for back and forth discussion. Vice Chair Lee: Asked Chair Brophy what he was proposing if he was saying that purely retail will not work due to declining retail and big box shopping. Said they discussed office at the last meeting and how they would be further imbalanced if they add office; talking about 40 acres or something in the Vallco Shopping district; the only other thing is residential; it says Alt. C or balanced plan 600 or 800. Chair Brophy: Said his argument was that he did not know what will happen to Vallco; it will get worse and it will have to be redeveloped but absent an owner who comes in with a specific plan, he believes that housing can play a role at Vallco; but at this time he was not willing to put Vallco onto the housing element sites list where in effect the city has given the presumption that housing will be approved at any site on the housing element. Said he was happy to put language in the General Plan saying they 964 Cupertino Planning Commission 6 October 20, 2014 understand that it is badly in need of redevelopment and it will likely include mixed use but he was not willing to commit the city. Said he would look at other sites; leally they have 1002 units that have to be approved by HCD which converts into having 1400 to send to them to allow for their refusing or downgrading sites, but they have to propose 1400 units. He said he had ones that are on the low list or no list at all that he submitted to staff, and they can provide their impressions. Shared his insights; said he would add units in the Hamptons; the letter received from Irvine Co. points out that there is no way the owner of the Hamptons can justify tearing down 340 units and replacing them with 600+ units. Given the unique location of the Hamptons, where it is immediately adjoining a 14,000 employee campus; it doesn’t come near any residential areas; it would be mid-rise housing with a limited number of school children; it is next to the Hwy 280 interchange that he would look at numbers similar to what the Irvine Co. has requested in the letter. They state that adding 344 units would not justify tearing down the existing 342; they are requesting permission to build 1,090 which is a net new increase of 748. A significant percentage of the people living there would be working at the Apple 2 campus. Concerns that staff have is that it is a large number on a single site and HCD may look askance at that type of request. Aarti Shrivastava: Said they could say they had 6 sites on the current list and want to keep that many regardless of how many the Commission may want to give one site or the other because last time they had 13 sites; the idea if they have a couple of sites and meet all of the unit requirements, the odds of convincing HCD about those redeveloping are much lower. They might have a chance to do a lot of back and forth if they had a lot of time and they don’t. Chair Brophy: Said the first place to look for housing is the 748 number that the Irvine Co. mentioned in their October 14 letter. Com. Gong: Suggested since they started on this path, to consider buildup to the HCD numbers with sites that they want to put forward; not 13 but the 6 or 7 that city staff is looking to put forward. Chair Brophy: Said he supported that; if they drop out the 600 from Vallco, they will need more than that; perhaps two or three sites to replace Vallco. In terms of the discussion during the last housing element, one aspect that HCD has been most willing to be responsive to, is on apartment complexes built in the 60s or 70s at much lower densities and that could reasonably be upgraded, similar to what was done with other projects where they squeezed in more. One place to look at more would be the Villages, adding it to Glenbrook. HCD has expressed some concern that these sites were on the last housing element and nothing happened. Com. Gong: Said if they are looking at the current recommended housing list and already bumped Hamptons up to 748 rather than the 344, they are only looking at other 400ish units; not looking at a critical mass. Chair Brophy: Said it would be a net increase of just over 400; they are down 200 if throw out Vallco; 235 units at the Oaks; the Oaks is an example of a center that also has seen better days; 235 is a high number there and suggestion to staff is they look at a number half that and that would still allow for a substantial development right on Stevens Creek Blvd that would minimize impacts on school enrollment and on traffic in residential areas , and still allow for a small rebuilding of a neighborhood shopping center that serves the DeAnza community as well as the residential area there. Said he thought the number was 965 Cupertino Planning Commission 7 October 20, 2014 120 that he suggested to staff, which would require them to find between the first three if they raised the Hamptons by 400, dropped 600 at Vallco and a little over a 100 at the Oaks, would have 300 to make up. The first one that jumps out to make up for it just sticking to the top list, Glenbrook is 517 units existing and it’s presently 20 units to the acre; that is a much lower density than would be built today on that parcel; nobody would build that low density; said by his calculations at 30 to the acre they would get 265 additional. In terms of large numbers, one would be the Villages, the same sort of thing; 20 per acre, if going to 30, that’s another 265; another site along Stevens Creek, that would be less likely to affect school enrollment is Stevens Creek Office Center which they had requested. Those are the 3 big ones; Glenbrook going from 20 to 30; Villages going from 20 to 30 and Stevens Creek Office Center at 214 with 40 per acre with 60 ft. height as was originally suggested. If you take away the 600 from Vallco out of the housing element and take away half the units at the Oaks as he suggested, there are still plenty of places to meet the state requirement; but if the majority want to put the Vallco units into the housing element, then much of this is moot. Com. Sun: Expressed his concern about Vallco; everyone is concerned about how to revitalize Vallco as a center of Cupertino; he said at this stage he was not clear if they entirely take Vallco out of the housing element, is it good for the future planning to have a mixed use center? Said he might prefer to keep some element of housing there; perhaps reduce from 600 to some number to give the developer some room to revitalize some incentive as some residents are going to have concerns; they have some preconditions; they have to have continued study session and make sure because they have already held 3 study sessions. He said he was surprised that it came to the Planning Commission with 600 housing element which is contrary with the former 3 study sessions with the public input. Said he wanted Cupertino to have the capacity to revitalize Vallco as nobody is happy with its current state. Said for housing purposes, he felt 200 to 400 is possible but they have to have a pre-condition. He said he did not feel confident about the transportation in that area. If they put 400 units or 200 units and combine with mixed use, the public transportation problem has to be solved within that certain area because it is going to be a traffic congested area; so far there is no clear picture or solution for that. If the Vallco element is put there, it is going to cause more trouble. Com. Gong: Asked Com. Sun if he was proposing that there be public input and that the developer must come up with a viable traffic mitigation plan? Com. Sun: Yes, it is the second condition; we need some number to the public and developer from economic reasoning, what is the number they can have as an incentive to revitalize the center? Barbara Coutts, Consulting Attorney: Said in terms of the sites and the adequacy of the sites the test is whether there is evidence in the record that the sites can be developed in the way you show them in the housing element in the next 8 years. The issue about a traffic mitigation condition is that if it didn’t seem like something that could be resolved and it made it questionable whether the site would be developed that could be problematic ; that is what the test is; whether it seems that the sites have the capability of being developed at the density that you are showing in the housing element in the next 8 years. Com. Sun: The second issue for the top priority is the lease, have some uncertainty about the ownership and the future construction; if there is nothing happening in the next 8 or 10 years. If there is no transaction happening so the potential buyer couldn’t build any house; is it possible to put some certain 966 Cupertino Planning Commission 8 October 20, 2014 ownership; they have a concrete plan to build there to put into the priority list; what is the logic there? Consulting Attorney: Paraphrased Com. Sun’s question; if he would like to say that you can be in the priority list if you have a concrete plan to develop? The difficulty is you have to submit the plan to HCD now as your Community Development Director is telling you and if you wanted to have that kind of condition, they would have to meet it now. If you are planning 8 years into the future you don’t know what is going to happen; what you have to have in your housing element now is your best projection based on what the owners have indicated their interest in and what you know now about which sites are likely to be developed in the next 8 years, recognizing that 8 years is a long time. Staff tried to pick sites where the owners had shown an interest in redevelopment; not sites where someone said they have no interest in doing anything anytime, so to the extent that you can know the future right now, these are the sites that seem likely to develop. Chair Brophy: Said they need to resolve Vallco first; If they don’t include Vallco in the housing element, there is nothing that prevents a future Planning Commission and City Council from approving a project that has a thousand units there if they so desire. He doesn’t want to lock the city into a situation where in effect they are telling the developer they are guaranteeing them that he will have 600 or 300 units and then the burden is on the city to prove that the scheme he is proposing is not desirable. Said he did not have a problem with saying that Vallco needs to be reused; said his objection is having it as a housing element site. Com. Gong: Said her concern with Vallco now is that there is not a plan; there is still fragmented ownership as it stands and going forward without any plan other than this is their dream. Said she was hesitant to allot them the maximum amount of housing they are looking for without understanding and without having community input into what will transpire. She is hesitant to add it to the list now for the next 8 years. Vice Chair Lee: Said she could support removing it from the housing element site; a maximum of up to 200 units, but there are other sites they could give more housing units to and not add additional housing elements to the list. Com. Gong: Because as Chair Brophy said, it doesn’t preclude them from having one buyer come in and drawing up plans and presenting them to the city and public; there is nothing to stop them from proceeding. They are discussing the housing element list; if they don’t include them it doesn’t prelude them from moving forward. Chair Brophy: Noted for the record that they received a letter from Sandhill Properties saying that they have all the parcels under control and would like to move forward; the staff suggestion was 600 units in the housing element and one million square feet of office; Sandhill requested two million sq. ft. of office. Aarti Shrivastava: Explained the reason it was put in the housing element by staff, once they had 1400 units worth of housing, adding more housing in the city could be an issue and they were trying to achieve a number of goals with the housing element and not necessarily require more housing to achieve the goals. If the Commission feels otherwise and they feel they could support other uses of Vallco regardless in 967 Cupertino Planning Commission 9 October 20, 2014 addition to the housing element, that is a recommendation they can make. Chair Brophy: Said they were presently addressing only the housing element. Ms. Shrivastava’s point is if they approve all these others they will be built and then they will come back and somebody request housing at Vallco, although as pointed out in the last meeting, they had 12 or 13 sites and only one got developed in the previous housing element round. Aarti Shrivastava: The difference between then and now if there wasn’t a lot of owner interest solicited at the time where people didn’t come in with sites; this time it is changing and HCD is looking for some of that. Said they could review the level of interest with all the owners of the recommended sites. She reviewed the sites where they have received interest from the property owners. The Oaks, Vallco, Hamptons, and Barry Swenson is another site a developer is looking at for affordable housing. In terms of United Furniture and Glenbrook no active letters have been received; but staff ensured that all the owners of all those sites have received letters from the city saying that they have been recommended or are being looked at as a housing element site. Relative to the Swenson site, there is a developer who is looking to purchase the site for an affordable housing project in partnership related to another project. Noted that sites 4, 5 and 6 are existing housing element sites; they are currently in the 2007-2014 housing element. Piu Ghosh: Said they had not heard anything new from them so recommended removal; it is site at the southwest corner of Homestead and Stelling, church (not reflected on the list). Aarti Shrivastava: Reported that they have interest from Marina Plaza, Stevens Creek Office had requested a density of 40 units per acre at one point; have not received active interest on the part of sites 9, 10, 11 or 12; 13 ; do have interest at 40 units per acre. This is the final list consisting of items 14 and 15; 14 have not received any letters; 15 the property owner had some questions about it and not sure if they received a No or Yes from them. Piu Ghosh: We have not yet heard a No from property owner; however there was someone looking at potentially redeveloping it ; 16 and 17 interest, 18 no owner interest received in redeveloping the site at this time; 18 is on the current housing element; 14, and 15 are currently on the housing element list. Chair Brophy: Said he was willing to move away from Stevens Creek to get some of the units; the Hamptons begin with over 748 units if they are approved by the request of Irvine Co. in their letter; looking at the Villages according to the numbers, if you take an existing complex at 20 and go to 30 which is well below what new projects are being built, that would be 265; Glenbrook the same thing going from 20 to 30 would give you 305; thought the Karl Berg site was not at 30 per acre, 203 units at 25 per acre, 169; this is an existing housing element site; an office complex at the north end of Bandley (next to the Villages). On the Aria scan design the reluctance of the staff is because it is a mid-block site and it is only a couple of acres to begin with. He suggested if it was made into a housing unit, that it be included with the credit union building and the gas station with the understanding that it would involve a site assembly of 3 parcels which is less than ideal, but in a fully developed community like Cupertino, not uncommon for what happens if we look at the example of the Biltmore expansion that was 3 parcels. He said the Aria site was not a big site but if it could be expanded to the corner, you would get 87 units at 25 per acre. Said he removed Loree Shopping Center which was one of the ones 968 Cupertino Planning Commission 10 October 20, 2014 on that list; the Barry Swenson Cyprus building site was combined; didn’t realize there was somebody interested in the Barry Swenson site, but the Cyprus property next to it gives 5.53 acres; at 25 or 30 you would be at 116 to 139; United Furniture site at 25 to 30 is 103 to 124; the two sites on Foothill, Foothill and McClellan don’t have a problem with them, they are not very large; those are what they are requesting, it is 19 units and 27 units; Stevens Creek Office Center which is the office center that includes the Panera and Peets; they requested 40 per acre; 60 foot height at 214 units; that seems a little high; would consider 35 per acre at 187 units, although I would be willing to go to 40 if that’s what we need to meet our target; the last one is the Granite Rock Summerwinds on So. DeAnza there at 40 per acre, 154 units, that seemed high to me; I thought maybe 35 per acre would get you down to 135 units; and the last site not on the list this is the parking lot in City Center which the owners are cognizant of but haven’t responded formally. The argument there would be the parking lot if you put an apartment building, this is the one example where I would look at a higher height, an apartment building at the same height as the neighboring apartment building; I don’t have a count for that but would guess it’s 75 or 80 units. There is a parking lot next to an apartment building; not sure if it is La Boulinger; there is a residential along Stevens Creek, all of it is City Center. If you use the parking lot and put another apartment building there, no taller than the existing one, you could get 75 units. Aarti Shrivastava: Depends on the density you want to build it at; you could get up to 130 units on that site if you built it at the same density as Montebello. Chair Brophy: Said that concluded his list which he has discussed with staff for some time and wrote them out as possible sites. Com. Gong: Said it was 12 properties well over the 6 or 7; trying to give lots of options. That’s not all recommended, there are some alternates. Chair Brophy: Said those are the ones he would be comfortable with; some more so than others. The two on Foothill are small; the Bateh Bros. and Foothill McClellan site ; staff is not enthused by those. Com. Gong: Stated her recommendations; said as a result of listening to the community and developers her list included the Oaks at 150, Hamptons at 748, United Furniture at 103, Barry Swenson property since learning there is a possible developer for affordable housing it goes to the top even though it is at 11 units; Glenbrook at 300, the Marina at 232, and the Bateh Bros. at 19. It distributes the housing element sites amongst the city limits instead of concentrating it in the Stevens Creek corridor which is what was heard from the community, that they would like more distributed options. This feels like more distributed, sharing the burden, the game plan; they are looking for about 1400 units. Oaks 235, no talk about Vallco; if putting a number it would be 200, Hamptons 748; balance the plan 344 additional, either meet their requirement or zero. Chair Brophy: Clarified they are talking about tearing down 320 units, but said they can’t tear down 320 top of the line apartment units to build 700 to get the only 700; would you agree that the original staff recommendation of 344 is not a viable option? 969 Cupertino Planning Commission 11 October 20, 2014 Com. Sun: 748 for Hamptons; United Furniture drop off the list; 11 for Barry Swenson, small, don’t care; keep the 11 there; Glenbrook keep it at 93; agree with Gong to up No. 7 Marina Plaza to 200. Vice Chair Lee: Oaks 150, Gong said as well; Hamptons 748, United Furniture 103, Barry Swenson 11, Glenbrook 300; the last two sites Village 265 and delete Karl Berg. Chair Brophy: Oaks 120, Hamptons 748, United Furniture 103, Glenbrook 300, Villages 265, Stevens Creek Office Center 35 to the acre which is 187. One center not discussed is Summerwinds. (staff said it is on the alternatives sites list and they could bring up the numbers if they wished to. Said he would look at Granite Rock Summerwinds at 35 to the acre ; get 135 and Marina Plaza, which was not included. Said it is a mini version of his my argument against Vallco; it is a thriving retail center and to give them 200 to 230 units he said he was not convinced that they could effectively develop that many units to use. Mr. McKibbins termed another Rosebowl there and still make the retail work on that site. If they were to come in with a plan requesting a conditional use of 25 to the acre he would consider it, look at their plan, make sure it still works as an effective retail; but for housing element purposes he was not willing to include that or the housing element. He reviewed the sites where there is most agreement. Summarized that all have included Hamptons at 748; all have Oaks on the list; Chair Brophy has 120, 150 two people and 235 is Com. Sun, 150 Com. Lee and Com. Gong. Com. Sun said he would go with majority under 150. Said he felt they could get Barry Swenson out of the way; Aarti Shrivastava: Said they can go to United 103, 3 people for United Furniture; (Don did not have United 103) and Barry Swenson and Glenbrook 300, 3 people and Sun have 93; Glenbrook ahead of United Furniture; just counting Hamptons, Oaks, Barry Swenson and Glenbrook we are just over 1200; Glenbrook 3 people. Vice Chair Lee and Chair Brophy put Villages down for 265; neither of you put Villages; what is your feeling on Villages? Com. Sun feels Villages too crowded; difficult to put housing there. Com. Gong prefers Summerwinds over Villages, but if a compromise, would ask for Summerwinds and a reduction on villages. Chair Brophy: Summerwinds put 35 to the acre; 135 units. Com. Gong has Summerwinds on list also; not okay at 135 for Com. Sun. Vice Chair Lee: Said her concern was a small lot and the height would jump up; stand out a lot. Com. Gong ok with Summerwinds at 96 since it is a smaller lot and further out; 25 units to the acre at 35, it should be in the 45 foot range and might have to build smaller units to get within 45; if it is still 45 that’s ok that is most of the height; 3 floors; Com. Gong can compromise on 96 at the 25. Chair Brophy: There is nothing to prevent a developer from coming in and asking for more; question of housing element here; Granite Rock Summerwinds at 96, just about 1400. How does anyone feel about Stevens Creek Office Center? Is he the only one for that one? Com. Gong: As opposed to come somewhere in between on the Villages? Is Com. Sun at zero at Villages, Summerwinds. 970 Cupertino Planning Commission 12 October 20, 2014 Com. Sun: Yes on Villages; can go with 96 for Summerwinds; consensus on 96. Chair Brophy reviewed: 748 Hamptons; 150 Oaks; 11 Barry Swenson; 96 Granite Rock/Summerwinds; 3 votes for 300 at Glenbrook; 3 votes for United at 103; gets to 1408; Is more needed to go to Council? Aarti Shrivastava: Give time to look at the sites; may need more time to look at the HCD criteria but the numbers look good and the numbers sites are good. If Granite Rock is approved at 25 the heights would be in the 45 foot range. Does anyone want to give the City Council any alternatives over 1400? Com. Gong: Willing to look at the Villages at not the 265; perhaps 100 … alternative sites for the Council. Chair Brophy: The Villages at their existing zoning of 20 according to the earlier studies, you could gain 62 just by going up to 20; tey could add 62 under their existing zoning; it is simply going to 100. Com. Sun: The traffic on Wolfe and Homestead is going to be jammed; perhaps take the Villages off the list; don’t put it from alternative up to the priority. Said he visited Marina Foods who intends to put in some mixed use whether they are given enough housing to build it and he said they need to listen to them because the ownership is fairly certain whether they are given an upgrade from 140 to 200. Most of the priority list is Oaks, Vallco and some others; the ownership is uncertain; for Marina Foods this traffic is closing to cross street DeAnza and Stevens Creek and if senior housing element is there, it is putting about 10% to 2% senior active element there. It is good for the future of Cupertino’s seniors to stay there because Cupertino is now 35 to 40% seniors already; they downsize from big house to small house; it is the only place to reduce traffic to put some seniors there. Chair Brophy: Said they had the issue come up last week; asked the consulting attorney if they could create a housing element site that would be limited to senior housing. Consulting Attorney: Explained there are issues about limiting sites to senior housing when the owner has not requested to build senior housing there; there is a protection in the Fair Housing laws both state and federal laws against discriminating against families with children; whereas if an owner requests senior housing there are ways to do it, but if a city requires that the only housing is senior housing, there could be a fair housing issue, so it is not something she would advise. Chair Brophy: Said it was his understanding that if they put it in the housing element, they cannot make it subject to being senior housing. Com. Sun: Said he didn’t want to mandate senior housing, just express his concern for the seniors and said they can ask the owner if they are willing to do the senior housing; senior housing has two types, either long term senior care related or just active senior housing. 971 Cupertino Planning Commission 13 October 20, 2014 Aarti Shrivastava: At this point what might make sense given that there are six sites being recommended, is to read it off the list and say if the priority is correct; then go to the sites the Commission may want to remove entirely or leave the rest of them on the alternative sites list and talk about what densities those might be. The Hamptons is one, the Oaks two, United Furniture is three, Barry Swenson four, Glenbrook five, Granite Rock Summerwinds six; that is the list at this time. The alternative sites list: the Villages 100 units; and we can determine if the Commission wants to add other sites to that alternative sites list. Chair Brophy: Said he spoke against the Marina; and two have spoken in support of it. Com. Gong: Said at the previous meeting she asked for clarification; currently Marina is zoned for housing (Aarti Shrivastava: mixed use/residential is allowed at 25 units). Vice Chair Lee: Said she did not support putting them on housing element site. Chair Brophy: Said they were at a 2/2 draw; if presenting it to the Council on Marina, what number are we divided on here; are you interested in the 145 or the 204? It is a conditional use, not a permitted use. Com. Gong: They are already allowed 145. Aarti Shrivastava: Presently those are permitted uses; the proposal is to make mixed use/residential sites that are not housing element sites conditional, but that is not the case at this time. Chair Brophy: Said since they are split, he was not opposed to the idea of residential, just concerned about it being on the housing element, but if both want it, need to know what number to put down for the Council to consider. Com. Gong/Com. Sun agreed: Would like as an alternative at 204. Chair Brophy summarized: Straw Vote on individual Housing Element sites : Recommended sites: 1. Hamptons (748 units), 4 votes, Com.Takahashi absent 2. Oaks (150 units), Com. Takahashi absent 3. United Furniture (103 units), 3 votes; Com. Sun No, Com. Takahashi absent 4. Barry Swenson (11 units), 4 votes; Com. Takahashi absent 5. Glenbrook (300 units), 3 votes; Com. Sun No, Com. Takahashi absent 6. Granite Rock/Summerwinds (96 units), 4 votes; Com. Takahashi absent (Total 1,408) 972 Cupertino Planning Commission 14 October 20, 2014 Alternative Sites: 1. Villages (92 units), 3 votes; Com. Sun No, Com. Takahashi absent 2. Marina Plaza (204 units), 2/2 vote with Coms. Gong and Sun Yes; Chair Brophy, Vice Chair Lee No; Com. Takahashi absent 3. Carl Berg (169 units), vote 2/2, Chair Brophy, Vice Chair Lee Yes; Coms. Sun and Gong No; Com. Takahashi absent. (Total 465 units on alternative sites for total of 1,873 for City Council consideration) Final Vote on Housing Element sites: 4 votes o Recommended sites and units 1-6 above o Alternate sites and units, 1-3 above Aarti Shrivastava: Only height change is Granite Rock and Hamptons; Hamptons will be as recommended in the Plan. The Oaks was recommended at 45 feet, 60 with retail. Response: make it 45 . It is not a housing element site, but will ask the question about Vallco later. Density recommended for Glenbrook is 30 dwelling units; the current height is 30 feet; it would be hard to achieve that; it would need a height of 45 ft. Heights Chair Brophy: As staff defines it, question 3; does the Planning Commission have any recommended changes to the balanced plan; do we have any recommended changes to the height recommended in the special areas here? North Crossroads Node Aarti Shrivastava: The Oaks to stay at 45; North Crossroads Node includes (shown on overhead) properties from Stevens Creek office all the way to DeAnza Blvd. and includes about half the depth of the Whole Foods; recommended at 45 or 60 with retail, the idea being if somebody were building office in the area because as recalls the recommendation was to put in a certain amount of office and it is up to the Planning Commission to decide if they wanted the current heights at/or 45 feet. Com. Gong: Said if going to increase heights anywhere, the north corner would be the corner from 45 to 60. Vice Chair Lee: Staff talked about the Oaks as well; a lot of people want to see the Oaks redeveloped; the city doesn’t have a lot of conference space ; not talking about Oaks but most of the city is 45 feet so if discussing about increasing heights along DeAnza it changes the look and feel of Cupertino; lot of folks don’t want to change the look and feel of it as you drive down Stevens Creek or DeAnza. Said she would propose to increase heights for the Hamptons; if there is a need to have a professional meeting, there is no conference center space and they have to go to San Jose. There are some proposals to increase height for a conference center space but don’t know of any in the Oaks but most of the city is 45 feet. Would not support increasing an entire street; increase the height, it increases the intensity and a lot more traffic. Relative to traffic, if you increase heights there will be more people and more intensity, then more traffic; said she would just increase heights because they have a reason to. 973 Cupertino Planning Commission 15 October 20, 2014 Chair Brophy: For the north crossroads node you would go with keeping it as is; flat 45. Com. Sun: The permits for that area is linked; agree with Com. Gong for 45 foot height with 60 retail. Chair Brophy: Probably more along the lines with Vice Chair Lee, go with 45 with 60 ft retail, for 3/1; that area is pretty well built out and it won’t have much effect. Aarti Shrivastava: Explained the recommendation; there are currently taller buildings in that area, but the current heights in the General Plan are 45 feet which is 3 stories and the recommendation was to go 60 and 75 with retail but only in the asterisked areas which is the parking lot in general. They could go to 90 with community benefits; however, the Commission has decided not to go with community benefits, hence they are looking for a general recommendation on height. Chair Brophy: Said he was pushing for converting the parking lot to a midrise office building but if that is not in the works would keep the existing heights, because people were unhappy when City Center was built; and unless they are helping to solve the housing element problem, he would just like to keep any new development at the existing level. Com. Sun: Said he agreed. Com. Gong: Said she agreed with what Vice Chair Lee said previously ; if there is not a reason, they shouldn’t change it at this point. Chair Brophy: Unanimous on that one. Straw Vote: North Crossroads Node – No Change – 4 votes Piu Ghosh: South Vallco Park, currently 45 ft or 60 ft with retail, no change. Aarti Shrivastava: North DeAnza Blvd. special area: current heights are 45; we are recommending 60; all office; the current Apple buildings are 60 feet. Chair Brophy: Agrees with Vice Chair Lee; don’t see why they want to add more; there is nothing there to redevelop. Aarti Shrivastava: The existing office sites; you could redesign a site, keep it the same: current is 45; it is being recommended at 60 ft. Heights used to be 60 in that area; that is why they could build at 60; staff recommendation is to bring it back to 60. Coms. Gong, Sun, Lee and Brophy: support 60 974 Cupertino Planning Commission 16 October 20, 2014 Vallco Shopping District west of Wolfe Rd: Chair Brophy: Said they are saying the General Plan is 45 or 60 with retail and now since they voted against community benefits, they are saying leave it unchanged. Staff said it depends on what the Commission wants. Balanced Plan says 45 or 60 with retail; is that what you still want? Aarti Shrivastava: The current heights are 45 and 60 with retail; the recommended Balanced Plan was to stay with the 2005 General Plan but to give additional height along Wolfe for up to 75 feet with community benefits. Chair Brophy: To the extent, if we vote against community benefits it would remain unchanged. Aarti Shrivastava: Said unless they wish to give the height without community benefits; it is the Commission’s choice. Vice Chair Lee: Said they did not hear from neighbors who live there; Portal area won’t get sun in the morning; it is currently at 45 or 60 feet with retail. Coms. Sun, Lee, Brophy, Gong: no change. East of Wolfe Rd. staff is asking to go to 60 or 75 with retail; what does this back up to? Aarti Shrivastava: It is 60, 75 with retail; It is in a box, it’s 60 feet, 75 with retail or 90 with community benefits. Com. Sun: Go with 75. Com. Gong: Fairly well set back, would support 60 with 75 with retail. Chair Brophy: Stick with what Rosebowl is which is 45 or 60 with retail; Vice Chair Lee: 60 with 75 ft. Vote: 3 votes for 60 ft. 75 with retail Straw Vote: o Vallco Shopping District (West of Wolfe Rd.) – No Change – 4 votes o Vallco Shopping District (East of Wolfe Rd.) – 60 ft. 75 with retail 3/1 Chair Brophy voting No. North DeAnza Gateway : Currently the limit is 45 ft; staff recommendation is 45 ft or 60 with retail or 90 ft for hotel and major convention center with community benefits (Cupertino Inn and Goodyear site) Chair Brophy: Go with staff recommendation, but not the 90 ft for community benefits as thought we already decided on that; saying 45 or 60 with retail, not willing to do 90. 975 Cupertino Planning Commission 17 October 20, 2014 Com. Sun: The site is quite isolated from the residential area so there is not much impact to the community; said he would go with 90 ft to provide a convention center and hotel; said he would vote for the community benefit but respected other people voting No. Com. Gong: Said she was willing to support the 90 ft. with the convention center caveat; as Vice Chair Lee said they don’t have any convention center space. Vice Chair Lee: agreed. Chair Brophy: What is definition of a major convention center? Is this going to be a couple of meeting rooms like Cyprus? (Vice Chair Lee: Minimum of 500 attendees.) Aarti Shrivastava: 250 was mentioned in the past: the Commission can decide. Straw Vote: No. DeAnza Gateway Area (Homestead Road Special Area) 45 ft./60 ft. with retail/90 ft. for hotel and 500-person convention center – 3/1 Chair Brophy voting No. Stelling Gateway: Aarti Shrivastava: Not recommending this height on the west side of Stelling; currently the height along Stelling is 45 feet; staff recommending 45 ft and 60 with retail only on the east side of Stelling which is the Homestead Lanes property. Chair Brophy: Opposed to adding the 60 ft retail because it will put pressure to tear down the shopping center; would rather keep it the same . Com. Gong: Keep it at 45 as well; Vice Chair Lee, Com. Sun: agree. Straw Vote: Stelling Gateway(Homestead Road Special Area) No Change – 4 Votes North Vallco Park Special Area : North Vallco Gateway west of Wolfe Rd. (Property with Marriott Courtyard, Hilton Garden, some apartment complexes and the Cupertino Village and Bank of the West) Aarti Shrivastava: When starting out, the discussion was should this whole area, the length be increased because that was a request. Staff recommendation at this time, what’s allowed in this area, 60 feet; staff’s recommendation is to keep it at 60 ft everywhere except for the areas where hotels are planned, and that is the Kimpco site for the hotel that includes those two sites, the Bank of the West and the pub, and also hotels along the freeway to increase those to 90 feet for hotel, major convention center with community benefits and we already have the heights of the Hamptons, so everybody agrees with that. We are looking at west of Wolfe. Chair Brophy: Said he understood there is some developable property there with the bank and pub, but do they really want to encourage squeezing more development in; it is hard enough to find parking at Cupertino 976 Cupertino Planning Commission 18 October 20, 2014 Village on Saturday and Sunday. Said he was skeptical it was a good location for a hotel and major convention center facility?. Coms. Gong, Lee and Sun: Said they felt it was not a good location for a convention center. No change for No. Vallco Gateway. The language for east of Wolfe Road is the language already agreed on. Straw Vote: 4 votes o No. Vallco Gateway (West of Wolfe Rd.) – No Change o No. Vallco Gateway (East of Wolfe Rd.) – Staff Recommendations So. DeAnza Blvd .: Chair Brophy: Didn’t we agree on 45 feet; did we end up with Summerwinds in the alternates list; it is on the recommended list at 45. Com. Gong : Supports raising the 45 ft for the Summerwinds as a residential project; Vice Chair Lee and Com. Sun agreed. Chair Brophy: Where we go with the merging to one area 30 feet, 25 units to the acre with the exception of the one side. Straw Vote: Summerwinds/Granite Rock and Glenbrooks – Increase height from 30 ft. to 45 ft. – 4 votes Straw Vote: Building planes along arterials – 1:1 – 4 votes Vallco Shopping District Chair Brophy: Clarified they had taken Vallco off the housing element list; that’s not to say at this point they cannot talk about what they envision in the General Plan for Vallco; now that it’s not part of the housing element anything here would still be subject to the analysis by staff, Commission and Council. Chair Brophy declared a short recess. Aarti Shrivastava: Said she would talk about what is current and what is in the proposed General Plan about Vallco in the Land Use Section. The current General Plan also talks about Vallco redeveloping as a mixed use site with a master developer and parcel assembly; there are no housing or office numbers in the land use section, it is all in the development allocation section, but what they talk about is creating a specific plan creating a distinct and memorable mixed use town center that is a regional destination and a focal point for the community; that is the goal. The policies require a specific plan prior to any development on that site and a specific plan process would be something similar to what Main Street went through to create their project; that lays out land uses, design standards and guidelines, infrastructural improvements. It also talks about a master developer to remove the obstacles related to developing a cohesive district, parcel assembly and a plan for complete redevelopment of the site; a town center plan, land use talks 977 Cupertino Planning Commission 19 October 20, 2014 about high performing retail restaurant and entertainment uses maintaining a minimum of 600,000 sq. ft. of retail; that provides a good source of sales tax for the city and entertainment uses may be included but no more than 30% of the retail uses; and we base that on the current square footage of the entertainment uses that includes the AMC, Bowl More and the skating rink, encouraging a business class hotel with a conference center and active uses; again allowing residential on upper floors with the retail and active uses on the ground floor; and for office encouraging a high quality office space and a pedestrian oriented street grid. It talks about connectivity and making sure that internal streets are connected and they are also connected to the external streets such as Stevens Creek, Vallco Parkway as well as Wolfe Road. It talks about open space in the form of a central town square and additional plazas and greens that create community gatherings spaces and locations for public art; building form, high quality architecture, creating a sense of place similar to language in our current General Plan; it refers to the community benefits program and heights in that community forum diagram. It talks about the gateway character of the site because it is a gateway into the city; it talks about a phasing plan that lays out the timing, infrastructure, open space and land use improvements; it talks about parking; talks about trees and providing neighborhood buffers from the adjacent single family residential areas. That is the language currently in the General Plan and we are looking for the Commission’s thoughts on the Vallco area. Said they were looking for general direction that the Planning Commission wants to take with Vallco; if they want to keep it as it exists; if they are willing to explore other uses, but require certain amount of retail on the site; include ideas and determine which ones are already incorporated or which new ones have to be added based on input received from the Commission. Chair Brophy: Said he had a number of concerns about the language as it currently is; would like to see the community benefit language deleted. Aarti Shrivastava: We understand that; if the community benefits go away, that will be struck. Chair Brophy: 600,000 feet is still a lot of square footage; many people are saying they want all retail and as big as possible; without doing any market research but thinking about other projects, putting that 600K number in may make life difficult for the developer and you may want to consider instead of having a specific number, having some language that says a serious retail component or a major retail component that includes a mixture of entertainment, food and retail without trying to box both yourself and the developer into a set of numbers. Rather than saying it should be also residential/office, high quality convention hotel, he said he would put those things out as possible uses, because in the end the project will have to go through the citizen outreach, Planning Commission, City Council process es, and try to identify more of a vision rather than could be interpreted by a would-be developer as a checklist of requirements. Aarti Shrivastava: Confirmed that Chair Brophy said the mix is okay but he would like to remove the 600K square feet of retail, and then talk about all the uses as possible uses on the site. Chair Brophy: Unlike the housing element at this point said he was not too concerned locking the city in, probably more concerned about having too complex a list of hurdles for a developer to clear and would like to open it up for the creativity of a developer, an architect, etc. 978 Cupertino Planning Commission 20 October 20, 2014 Com. Sun: Vallco Shopping Center has been a long term concern for every citizen in Cupertino; for the Planning Commission to make any recommendation they will probably have some different view about Vallco. Said at this stage he would recommend three steps to City Council: (1) Continue the public study session to get all city’s input put together and summarize the previous three study sessions with all community; what they want; get their feedback and then give the Council more clear picture what the community needs. (2) He recommended that city staff invite sponsor or developer, or nationwide or regional wide city planner expert especially experts on developing this type of mixed use land development; give seminar on how they can develop Vallco Center. (3) The fundamental concern of Vallco Shopping Center is public transportation; is there any way to solve the Vallco transportation because it is going to have Apple Phase 2 traffic issue too. They want a better traffic consulting firm; try to look for another one to give better prediction; use better model. Said he predicted it would turn worse; and suggested looking for an alternative traffic consultant for better advice. Said he did not want to talk in more detail about what percentage of retail, what percentage of business; that all depends on the community input, depends on the city and also on the developers how they feel they can make money. Aarti Shrivastava: A specific plan will require a traffic consultant as well as urban design consultants so your recommendations could be incorporated as part of that; as well as the public work sessions, similar to the Main Street project. The idea would be as part of the specific plan process , a developer can come in and make a recommendation on the kind of project and have community workshops so that you could get information from the community. Com. Gong: Said she agreed on the town center concept with the mix of retail, entertainment, residential and office; but again with Chair Brophy, it is premature to state specifics at this time. Vice Chair Lee: Said she wanted to keep it mostly retail, but would agree with Chair Brophy’s comments if the site may include some housing; it may include some office but it shouldn’t be that it must include office, housing, etc. Aarti Shrivastava: Said she did not feel that was the intent; they need to make that clear that if office , retail or hotel is included, there are expectations for how they will work on the site and a list of possible uses and some guidance on how they should be included. Vice Chair Lee: Also may include a major convention center and a five star hotel or something similar. Chair Brophy: Said he knew of 3 national developers who looked at Vallco and staff likely has had inquiries from more; it is a tough piece of property to work with; multiple uses. Said he had admiration for what Sandhill did in apparently tying up contracts on the parcels although the letter they submitted envisioned a project. At this stage, they should be extremely careful about language , saying not only what uses they want but how they envision them and what price points and things like that. It is a tough enough deal to come up with a concept to try; as long as they have the whole process of requiring a specific plan. Be cautious about throwing out too many expectations at this stage; and saying what they are looking for is something that works as a integrated entity. Try to be modest about what their abilities are to foresee what the solution is for Vallco at this stage. 979 Cupertino Planning Commission 21 October 20, 2014 Aarti Shrivastava: Said it isjust generic language about high quality architecture and nice spaces; don’t think there is language on where to locate them, much of that will depend on the final plan; building neighborhood buffers. Those are some of the things we have heard repeatedly and are some things we have put in; as well as our experience on projects like Main Street, having some language helps and we have used a lot of the existing language in the General Plan. Don’t think the point was never to say these uses have to be there on the site but to say a list of possible uses could be in addition to retail, office and residential, and keep the guidance as guidance only. Staff wanted to make sure that the policies that were written hit the right points and that is our intent and we will forward the recommendation to change the uses to be possible uses and include a five star hotel and major convention center. Com Sun: Said the question is whether all commissioners agree that Vallco center is going to turn into the town center, seems like a mystery or are they still keeping 100% for the retail? Aarti Shrivastava: What they heard from the Planning Commission was they were willing to see a mix of uses but you would have to go through specific plan process and the community process to figure out what that mix is; a qualifier was put in at 600K; they don’t want a number there, so will just say retail. Straw Vote: Vallco Shopping District Language: 4 Votes o Remove from Housing Element sites list o Require Specific Plan with public process o Remove language about amount of retail o List office, hotel (would like five-star hotel and major convention center) and residential as possible uses and not requires uses o Agree on “Town Center” concept PG&E and Mirapath Sites Chair Brophy: Said it was not clear why they would want to commercially zone it; PG&E isn’t going to leave the site and it is a marginal location for any kind of commercial business; if the piece is going to be used by PG&E indefinitely, it should be kept as is. If somebody comes in with an alternative idea, resolve it at that time. Com. Gong: What is the probability it would ever become anything but a PG&E site; would we want PG&E to vacate the property; where would they go in our city? We don’t want to make it easy for them to vacate the property. I don’t have an opinion on it but it is a 25 year lookout so as the consultant says, things can happen. I have no objection to it, unless staff can find a reason why we shouldn’t. Chair Brophy: Said perhaps they should re-look at that assuming that someone has an interest and after the Apple 2 campus is built because he recalled it has a substantial impact on Homestead traffic. Said he did not have a strong opinion on it because he didn’t feel it would change. It is a strange way to do it without any interest from the property owner. Said they would vacate it if they had another place to go, but there are not a lot of equivalent sites around waiting to take a PG&E yard; it is not a high value piece of land. It may still be a PG&E yard in ten years. If the property became available, if it was a blank piece of property he said he assumed that a would-be owner’s first preference would be residential. 980 Cupertino Planning Commission 22 October 20, 2014 Com. Sun: Said his position on the site is just a mandate from a public institution or to the commercial; the reason is the possibility whether PG&E wants to sell or transfer it, which would leave some option for the future business if they take this as an opportunity. Straw Vote: 4 Votes o PG&E site - Commercial/Quasi-Public (CG/BO) o Mirapath - Commercial/Industrial (CG/ML) MOTION: Motion by Vice Chair Lee, second by Com. Sun, and unanimously carried 4-0-0, Com. Takahashi absent; to approve EA-2013-03 Resolution No. 6760 Alternate of the Cupertino Planning Commission recommending certification of an Environmental Impact Report for the General Plan Amendment, Housing Element Update and associated rezoning project; and adoption of findings and a statement of overriding considerations, mitigation measures, and mitigation monitoring and reporting program consistent with the Planning Commission’s recommendation of the project. MOTION: Motion by Vice Chair Lee, second by Com. Gong, and unanimously carried 4-0-0, Com. Takahashi absent; to adopt GPA-2013-01 in substantially similar form to the attached Resolution 6761 as amended. MOTION: Motion by Com. Sun, second by Com. Gong , and unanimously carried 4-0-0, Com. Takahashi absent; to authorize staff to in substantial and similar form to the attached Resolution 6762, attachment 3 as amended; the first four in the draft 2014-2022, Housing Element to the State Department of Housing and Community Development; to use the prioritized list of Alternative Housing Element sites in case one or more of the adopted sites are not accepted by HCD as Housing Element sites as amended. MOTION: Motion by Com. Gong, second by Com. Sun, and unanimously carried 4-0-0, Com. Takahashi absent, to approve the Zoning Map Amendments Z-2013-03 in substantially similar form, to the attached Resolution 6763 as amended. MOTION: Motion by Com. Sun, second by Com. Gong, and unanimously carried 4-0-0, Com. Takahashi absent; to approve Municipal Code Amendments MCA-2014-01 in substantially similar form to the attached Resolution 6764 as amended. MOTION: Motion by Vice Chair Lee, second by Com. Sun, and unanimously carried 4-0-0, Com. Takahashi absent, to approve Specific Plan Amendment SPA-2014-01 in substantially similar form to the attached Resolution 6765 attachment 6 as amended. The meeting was adjourned to the October 28, 2014 Planning Commission meeting at 6:45 p.m. Respectfully Submitted: /s/Elizabeth Ellis Elizabeth Ellis, Recording Secretary 981 City Hall De Anza College Apple Campus 2280 85 280 280 85 85 85 CUPERTINO SUNNYVALE SARATOGA WEST VALLEY SANTA CLARA 100,000 s.f. 200 rooms 200 units Development Allocation Commercial..........250,000 s.f. Office....................50,000 s.f. Hotel.....................300 rooms Residential............530 units Homestead Special Area Primary Uses Commercial, Office and Residential Maximum Residential Density Up to 35 units per acre Maximum Height 30 feet, or 45 feet (south side between De Anza and Stelling) Development Allocation Commercial..........100,000 s.f. Office....................90,000 s.f. Hotel.....................300 rooms Residential............825 units North Vallco park Special Area Primary Uses Commercial, Office and Residential Maximum Residential Density 25 units per acre Maximum Height 60 feet Development Allocation Commercial..........750,000 s.f. Office....................2,700,000 s.f. Hotel.....................639 rooms Residential............2,100 units Heart of the City Special Area Primary Uses Commercial, Office and Residential Maximum Residential Density 25 or 35 (South Vallco) units per acre Maximum Height 45 feet Development Allocation Commercial..........25,000 s.f. Office....................400,000 s.f. Hotel.....................100 rooms Residential............170 units North De Anza Special Area Primary Uses Office Maximum Residential Density 25 units per acre Maximum Height 75 feet Development Allocation Commercial..........125,000 s.f. Office....................50,000 s.f. Hotel.....................none Residential............275 units South De Anza Special Area Primary Uses Office Maximum Residential Density 25 units per acre Maximum Height 30 feet ·········· Citywide Development Summary Existing Alternative A Difference 17,113 s.f. 390,000 s.f. 695,629 s.f. 680,000 s.f. 339 rooms 600 rooms 1416 units 1620 units 523,118 s.f. 650,231 s.f. 5,784 s.f. 21,413 s.f. 0 0 479 units 275 units 540,231 s.f. 1,040,231 s.f. 701,413 s.f. 701,413 s.f. 339 rooms 600 rooms 1,895 units 1,895 units Citywide Development Allocation Major Corridors Built/Approved Office Commercial Hotel Residential Other Special Areas* Office Commercial Hotel Residential Total Office Commercial Hotel Residential Remaining in Existing GP Alternative C Difference 8,929,775 s.f. 3,729,569 s.f. 1,090 rooms 21,399 units + 3,272,887 s.f. + 554,371 s.f. + 1,000 rooms + 2,484 units + 227,113 s.f. + 87,895 s.f. 0 + 42 units + 3,500,000 s.f. + 642,266 s.f. + 1,000 rooms + 2,526 units 17,113 s.f. 3,290,000 s.f. 695,629 s.f. 1,250,000 s.f. 339 rooms 1,339 rooms 1,416 units 3,900 units 523,118 s.f. 750,231 s.f. 5,784 s.f. 93,679 s.f. 0 0 479 units 521 units 540,231 s.f. 4,040,231 s.f. 701,413 s.f. 1,343,679 s.f. 339 rooms 1,339 rooms 1,895 units 4,421 units * Includes Bubb Road, Fairgrove, Monta Vista, Oak Valley, other neighborhoods, major employers and other commercial/mixed-use centers, as defined in the 2005 General Plan. ** Net new commercial is not proposed - it is assumed that the existing Vallco Mall square footage (1,267,601 s.f.) will be demolished and that 625,335 s.f. would be reserved for future projects. Note: Housing Element sites may have different dnsities as noted. STEVENS CREEK BLVD WO L F E R D DE A N Z A B L V D DE A N Z A B L V D HOMESTEAD RD North Crossroads Node Primary Uses Commercial, Office and Residential Maximum Residential Density 40 units per acre Maximum Height 60 feet, or 75 with a retail component City Center Node Primary Uses Commercial, Office and Residential Maximum Residential Density 25 units per acre Maximum Height 75 feet, or 90 feet with a retail component, = 110 feet with retail and project-wide/ community benefits South Vallco Park Gateway East Primary Uses Commercial, Office and Residential Maximum Residential Density 35 units per acre Maximum Height 75 feet or 90 feet with retail, = 160 feet with retail and project-wide/ community benefits North Vallco Gateway Primary Uses Commercial, Office and Residential Maximum Residential Density 25 units per acre (110 units per acre for Hamptons Site) Maximum Height 60 feet, or 75 feet with a retail component (retail not required east of Wolfe Rd), or 85 feet with no retail for the Hamptons = 130 feet along Wolfe Rd with retail and project-wide/community benefits North De Anza Gateway Primary Uses Commercial Maximum Residential Density 35 units per acre Maximum Height 60 feet, or 75 feet with a retail component, 145 feet with retail and project-wide/ community benefits South Vallco Park Gateway West Primary Uses Commercial, Office and Residential Maximum Residential Density 35 units per acre Maximum Height 60 feet, or 75 with a retail component, or 85 feet along Stevens Creek Blvd and Wolfe Rd with retail and project-wide/community benefits Stelling Gateway Primary Uses Commercial and Residential Maximum Residential Density 35 units per acre Maximum Height 45 feet, or 60 feet with a retail component Oaks Gateway Primary Uses Commercial, Office and Residential Maximum Residential Density 35 units per acre Maximum Height 60 feet, or 75 feet with a retail component * ** * * * * * * * 08001600 2400 Feet N Legend City Boundary BRT Stop (for environmental analysis) BRT Line (for environmental analysis) Key Intersections * Additional height allowances w/ retail and project-wide benefits Alternative C revised 10.8.14 982 City Hall De Anza College Apple Campus 2280 85 280 280 85 85 85 CUPERTINO SUNNYVALE SARATOGA WEST VALLEY SANTA CLARA ·· Development Allocation Commercial..........250,000 s.f. Office....................25,000 s.f. Hotel.....................150 rooms Residential............400 units Homestead Special Area Primary Uses Commercial, Office and Residential Maximum Residential Density Up to 35 units per acre Maximum Height 30 feet, or 45 feet (south side between De Anza and Stelling) Development Allocation Commercial..........100,000 s.f. Office....................75,000 s.f. Hotel.....................150 rooms Residential............350 units North Vallco Park Special Area Primary Uses Commercial, Office, Residential Maximum Residential Density 25 or 65 (Hamptons site) units per acre Maximum Height 60 feet Development Allocation Commercial..........750,000 s.f. Office....................1,500,000 s.f. Hotel.....................439 rooms Residential............1,700 units Heart of the City Special Area Primary Uses Commercial, Office and Residential Maximum Residential Density 25 or 35 (Vallco, Stevens Creek Office Center, Marina Foods, and the Oaks) units per acre Maximum Height 45 feet Development Allocation Commercial..........25,000 s.f. Office....................200,000 s.f. Hotel.....................100 rooms Residential............170 units North De Anza Special Area Primary Uses Commercial, Office and Residential Maximum Residential Density 25 units per acre Maximum Height 60 feet Development Allocation Commercial..........125,000 s.f. Office....................25,000 s.f. Hotel.....................none Residential............201 units South De Anza Special Area ·· Primary Uses Commercial, Office and Residential Maximum Residential Density 25 units per acre Maximum Height 30 feet ** Net new commercial is not proposed - it is assumed that the existing Vallco Mall square footage (1,267,601 s.f.) will be demolished and that 625,335 s.f. would be reserved for future projects. ·········· Citywide Development Summary Existing Alternative A Difference 17,113 s.f. 390,000 s.f. 695,629 s.f. 680,000 s.f. 339 rooms 600 rooms 1416 units 1620 units 523,118 s.f. 650,231 s.f. 5,784 s.f. 21,413 s.f. 0 0 479 units 275 units 540,231 s.f. 1,040,231 s.f. 701,413 s.f. 701,413 s.f. 339 rooms 600 rooms 1,895 units 1,895 units Citywide Development Allocation Major Corridors Built/Approved Office Commercial Hotel Residential Other Special Areas* Office Commercial Hotel Residential Total Office Commercial Hotel Residential Remaining in Existing GP Alternative B Difference 8,929,775 s.f. 3,729,569 s.f. 1,090 rooms 21,399 units + 1,807,887 s.f. + 554,371 s.f. ** + 500 rooms + 1,405 units + 192,113 s.f. + 87,895 s.f. ** 0 + 16 units + 2,000,000 s.f. + 642,266 s.f. ** + 500 rooms + 1,421 units 17,113 s.f. 1,825,000 s.f. 695,629 s.f. 1,250,000 s.f. 339 rooms 839 rooms 1,416 units 2,821 units 523,118 s.f. 715,231 s.f. 5,784 s.f. 93,679 s.f. 0 0 479 units 495 units 540,231 s.f. 2,540,231 s.f. 701,413 s.f. 1,343,679 s.f. 339 rooms 839 rooms 1,895 units 3,316 units * Includes Bubb Road, Fairgrove, Monta Vista, Oak Valley, other neighborhoods, major employers and other commercial/mixed-use centers, as defined in the 2005 General Plan. Note: Housing Element sites may have different densities as noted. STEVENS CREEK BLVD WO L F E R D DE A N Z A B L V D DE A N Z A B L V D HOMESTEAD RD Oaks Gateway Primary Uses Commercial, Office and Residential Maximum Residential Density 35 units per acre Maximum Height 45 feet, or 60 feet with a retail component North Crossroads Node Primary Uses Commercial, Office and Residential Maximum Residential Density 35 units per acre Maximum Height 45 feet, or 60 feet with a retail component City Center Node Primary Uses Commercial, Office and Residential Maximum Residential Density 25 units per acre Maximum Height 60 feet, 75 feet with a retail component. = 90 feet with retail and project-wide/ community South Vallco Park Gateway West Primary Uses Commercial, Office and Residential Maximum Residential Density 35 units per acre Maximum Height 45 feet, or 60 feet with a retail component. 75 feet along Stevens Creek Blvd and Wolfe Rd with retail and project-wide/community benefits South Vallco Park Gateway East Primary Uses Commercial, Office and Residential Maximum Residential Density 35 units per acre Maximum Height 60 feet, or 75 feet with a retail component. = 110 feet with retail and project-wide/ community benefits North Vallco Gateway Primary Uses Commercial, Office and Residential Maximum Residential Density 25 units per acre (65 units per acre for Hamptons Site) Maximum Height 60 feet, or 75 feet with a retail component along Wolfe Rd (retail not required on east side of Wolfe Rd). = 95 feet with retail and project-wide/ community benefits North De Anza Gateway Primary Uses Commercial Maximum Residential Density 35 units per acre Maximum Height 60 feet, or 75 feet with a retail component. 95 feet with retail and project-wide/ community benefits Stelling Gateway Primary Uses Commercial and Residential Maximum Residential Density 35 units per acre Maximum Height 45 feet, or 60 with a retail component * ** * * * * * * * * 08001600 2400 Feet N Legend City Boundary BRT Stop (for environmental analysis) BRT Line (for environmental analysis) Key Intersections * Additional height allowances w/ retail and project-wide/community benefits Alternative B revised 6.9.14 983 City Hall De Anza College Apple Campus 2280 85 280 280 85 85 85 CUPERTINO SUNNYVALE SARATOGA WEST VALLEY SANTA CLARA ·········· Development Allocation Commercial..........70,000 s.f. Office....................10,000 s.f. Hotel.....................125 rooms Residential............200 units Homestead Special Area Primary Uses Commercial, Office and Residential Maximum Residential Density 10 (between Blaney and Blue Jay), 20 (between Blue Jay and De Anza, and north side of Homestead between De Anza and Franco), 35 (south side of Homestead between De Anza and Stelling) and 15 (between Stelling and Sunnyvale) units per acre Maximum Height 30 feet, or 45 feet (south side between De Anza and Stelling) Development Allocation Commercial..........50,000 s.f. Office....................30,000 s.f. Hotel.....................100 rooms Residential............100 units North Vallco Park Special Area Primary Uses Commercial, Office and Residential Maximum Residential Density 25 units per acre Maximum Height 60 feet Development Allocation Commercial..........500,000 s.f. Office....................315,000 s.f. Hotel.....................375 rooms Residential............1,000 units Heart of the City Special Area Primary Uses Commercial, Office and Residential Maximum Residential Density 25 or 35 (South Vallco) units per acre Maximum Height 45 feet Development Allocation Commercial..........10,000 s.f. Office....................25,000 s.f. Hotel.....................none Residential............170 units North De Anza Special Area Primary Uses Commercial, Office and Residential Maximum Residential Density 25 units per acre Maximum Height 45 feet Development Allocation Commercial..........50,000 s.f. Office....................10,000 s.f. Hotel.....................none Residential...........150 units South De Anza Special Area Primary Uses Commercial, Office and Residential Maximum Residential Density 25 units per acre Maximum Height 30 feet Citywide Development Summary Existing Alternative A Difference 17,113 s.f. 390,000 s.f. 695,629 s.f. 680,000 s.f. 339 rooms 600 rooms 1416 units 1620 units 523,118 s.f. 650,231 s.f. 5,784 s.f. 21,413 s.f. 0 0 479 units 275 units 540,231 s.f. 1,040,231 s.f. 701,413 s.f. 701,413 s.f. 339 rooms 600 rooms 1,895 units 1,895 units Citywide Development Allocation 17,113 s.f. 390,000 s.f. 695,629 s.f. 680,000 s.f. 339 rooms 600 rooms 1,416 units 1,620 units 523,118 s.f. 650,231 s.f. 5,784 s.f. 21,413 s.f. 0 0 479 units 275 units 540,231 s.f. 1,040,231 s.f. 701,413 s.f. 701,413 s.f. 339 rooms 600 rooms 1,895 units 1,895 units Major Corridors Built/Approved Office Commercial Hotel Residential Other Special Areas* Office Commercial Hotel Residential Total Office Commercial Hotel Residential +372,887 s.f. - 15,629 s.f. +261 rooms +204 units +127,113 s.f. +15,629 s.f. 0 - 204 units +500,000 s.f. 0 +261 rooms 0 * Includes Bubb Road, Fairgrove, Monta Vista, Oak Valley, other neighborhoods, major employers and other commercial/mixed-use centers, as defined in the 2005 General Plan. Remaining in Existing GP Alternative A Difference 8,929,774 s.f. 3,729,569 s.f. 1,090 rooms 21,399 units STEVENS CREEK BLVD WO L F E R D DE A N Z A B L V D DE A N Z A B L V D HOMESTEAD RD Stelling Gateway Primary Uses Commercial and Residential Maximum Residential Density 35 units per acre (east side of Stelling), 15 units per acre (west side of Stelling) Maximum Height 30 (west side of Stelling) or 45 (east side of Stelling) feet Oaks Gateway Primary Uses Commercial and Residential Maximum Residential Density 25 units per acre Maximum Height 45 feet North Crossroads Node Primary Uses Commercial, Office and Residential Maximum Residential Density 25 units per acre Maximum Height 45 feet City Center Node Primary Uses Commercial, Office and Residential Maximum Residential Density 25 units per acre Maximum Height 45 feet South Vallco Park Gateway West Primary Uses Commercial, Office and Residential Maximum Residential Density 35 units per acre Maximum Height 45 feet, or 60 feet with a retail component South Vallco Park Gateway East Primary Uses Commercial, Office and Residential Maximum Residential Density 35 units per acre Maximum Height 45 feet, or 60 feet with a retail component North Vallco Gateway Primary Uses Commercial and Office Maximum Residential Density 25 units per acre Maximum Height 60 feet North De Anza Gateway Primary Uses Commercial Maximum Residential Density 35 units per acre Maximum Height 45 feet 08001600 2400 Feet N Legend City Boundary Key Intersections Alternative Arevised 6.9.14 984 Pg LU-15 Updated Strategy title from “Major Companies to “Major Employers” Pg LU-16 985 Pg LU-35 Pg LU-48 Pg LU-49 Pg LU-53 Pg LU-53 Pg LU-62 Pg LU-64 Pg LU-66 Pg LU-68 Pg LU-72 Pg LU-74 Pg LU-75 986 987 988 989 990 991 992 993 994 Legend tran_Road ST_TYPE Arterials Driveways Freeways Local Roads Collectors DE A N Z A JUNIPERO SERRA ST E L L I N G STEVENS CREEK HOMESTEAD TA N T A U W E S T V A L L E Y BL A N E Y BU B B FO O T H I L L WO L F E PROSPECT MCCLELLAN STEVENS CAN Y O N MI L L E R XX X LA W R E N C E M A R Y BOLLINGER ALVES MONTEBELLO JO H N S O N VOSS ES T A T E S LOREE REG N A R T PO R T A L TILSON HY D E JU D Y BR E T MA N N PRUNERIDGE LORNE FI N C H BY R N E RODRIGUES MERRITT BA N D L E Y ST E R N VAI WU N D E R L I C H KIRWIN KI M OR A N G E C R E S T O N COLUMBUS PHIL SC E N I C PO P P Y WR I G H T STOKE S VALLCO BARK BE A R D O N CO L B Y WE Y B U R N LA MAR ERIN PH A R L A P R A E C R I S T O R E Y S T E R L I N G LI N N E T D E O D A R A PALM FA R A L L O N E HE R O N BALBOA VI S T A LAZANEO CA L V E R T GIA N N I N I CHIALA RAINBOW SALEM GREENLEAF CA S T I N E WHEATON LA N C E R AL P I N E BO N N Y DE N I S O N PR I M R O S E LA R R Y AI N S W O R T H MA X I N E F E S T I V A L WI N D S O R LA R K RA N D Y BLUE HILL TERRACE GLE N V I E W SCOFIELD FARGO LI N D A V I S T A MARIANI 280 F W Y R A M P WI L K I N S O N VALLEY GREEN SHELLY K E N T W O O D N O E L STAFF O R D S A N J U A N HYANNISPORT DUMAS GALLI BL U E J A Y ALCALDE GASC O I G N E HA R L A N TIPTOE PRICE DE FOE PE R I M E T E R ALCAZAR CR A I G RIC H W O O D ARATA DUNBAR KEN T SE P T E M B E R O A K V A L L E Y MELVI N WE S T L Y N N PE A C O C K SUISUN PENDLETON SA N T A T E R E S A CUPERTINO SUNRISE L I N D Y JO H N HI L L S D A L E HU B B A R D UP L A N D CA R V E R NEWSOM FL O R A V I S T A ARB O R E T U M LILAC TOMPKINS MI N E R JANICE ANCOCK LUCILLE VI S T A K N O L L DE SOTO LO W E L L LONDONDERRY HI G H L A N D S ST J O S E P H PR O U T Y MO R E T T I HANFORD FALLEN LEAF TU L A PRESIDIO KI M B E R L Y P E N I N S U L A MA R T I N SA I C H ROSARIO M I L K Y WOOD S PORT O L A MA R I A BAH L BE T T E BARNHART PHYLLIS CASTANO PACIFICA AMAPOLA LA R O D A DRAKE LO C K W O O D D E M P S T E R COR D O V A BE T L I N ASPEN M A D E R A SA M E D R A FOREST SW A L L O W WINDIM E R PA S A D E N A TUGGLE PENDERGAST FORGE C A N Y O N O A K AN T O N S A N T A L U C I A LO N N A LI L Y PL U M T R E E CY N T H I A C E D A R WATERFORD SULLIVAN BE R N A R D O H I L L C R E S T LOMITA BELVEDERE E L M S F O R D MI R A V I S T A AR L I N G T O N RED W O O D GARDEN GATE TO N I T A CA R M E N N O V E M B E R PA L O V I S T A OA K T R E E HANNA A V E N I D A ST M A R Y ' S CO R V E T T E MINE T T E CLAY ME A D O W OLIVE MILFORD EDWARD PINEV I L L E NO R W I C H S Y C A M O R E AV O N D A L E ME N H A R T CASTLETON AN N A R B O R S C O T L A N D CLARENDON MEDINA ST E N D H A L FE L T O N ME R R I M A N PA R L E T T BREN T OAKVI L L E STARLING BEE C H W O O D SWISS CRE E K W A L L A C E JA M E S T O W N SOMERSET BELKNAP BARRA N C A AN N NORTHWOOD AL L E Y HO W A R D SILVERADO AL D E R B R O O K YO R K S H I R E RO S E B L O S S O M CHERYL ST O N E H E A V E N SHARON B E A U C H A M P S A R R O W H E A D RIVERSI D E LA CONNER LAURETTA HEATHERWOOD BA X T E R AD R I A N A VI A R O N C O L E MAUREEN MELODY CORONADO TE R R Y W I I N S T O N BIXBY AMULET MEIGGS VINEYAR D CUL B E R T S O N WE S T A C R E S BA Y W O O D SHADOWHILL RUMFORD PA R K W O O D NO R A N D A SHASTA LEEDS E M P I R E GILLIC K LONGDOWN BEEKMAN ST F R A N C I S HO L L E N B E C K SAN FERNANDO BLU E H I L L S AMHERST VIC K S B U R G AN S O N HU N T E R S T O N DAVISO N GRENOLA KI N T Y R E NORMANDY BENTOAK PAYETTE ELM F I R LA H E R R A N TU L I P A N A S T E R TO R R E LE B A N O N CRA F T CHRISTENSEN STANFORD DOLORES MO N T C L A I R POCATELLO AL H A M B R A C E M E T E R Y GL E N HU D S O N BE L L E V I L L E HU N T I N G T O N SE Q U O I A GRANADA RICARDO HAZELBROOK OA K C R E E L EDSEL HERMOSA HARTMAN MO R E N G O FR A N C O GARDENA VIA VICO CLIFDEN ORION CA S S DA N B U R Y NEWCASTLE LA S A L L E S A N T A C L A R A LA U R E N T I A N DE R B Y S H I R E RAMPA R T ROBINDELL H E N E Y C R E E K CA N A R Y SHADYGROVE DARTMOOR SANTA PAULA CA L G A R Y PUMPKIN DR Y D E N KRZICH PEPPER TREE HI B I S C U S RU P P E L L PA R I S H FE R N G R O V E PEACH BLOSSOM DEVON WOODRIDGE SERRA R E S U L T S FR I A R S METEOR IM P E R I A L CH A C E PI N E C R E S T E D D I N G T O N BUR N E T T LAS ONDAS CREEKLINE BU C K T H O R N E MERC E D E S LA P A L O M A IN F I N I T E L O O P GREENWOOD M I M O S A FI R W O O D GL E N C O E SELKIRK LA N S D A L E C R I C K E T H I L L SOLA ME A D O W L A R K TU S C A N Y CO L D H A R B O R AN D O V E R M A N Z A N I T A OL M O WH I T N E Y BR O O K G R O V E PARNELL HALL DE LA FARGE PE N I N S U L A R GRAND STA U F F E R ORANGE BLOSSOM WOODV I E W RALYA PEAR TREE CR E S T L I N E QU A I L KE S T E R RI D G E V I E W PR U N E T R E E DONEGAL CLI F F O R D ACADIA ALMADEN WE S T E R N HAM M O N D RUCKER ST O N Y D A L E JO H A N S E N NILE LO N G F E L L O W LI N D S A Y KA M S A C K WOODBURY CALI CARLYSLE BA N F F APPLE TREE SHE T L A N D MONROVIA CODY HA L E AUBURN ELENDA MY E R CH E L M S F O R D OX F O R D JA C Q U E L I N E WILDFLOWER BA R B A R A GREENOAK CART A B L A N C A PA R A D I S E LINDE N B R O O K W O O D H I L L LA GRANDE CH E R R Y T R E E HOLLANDERRY SHATTUCK TWIG NE W B R U N S W I C K KINGSBURY MONTE SA R A T O G A S U N N Y V A L E RUNO PR A D O V I S T A OLIVEWOOD CL A R K S T O N MASO N M A D R O N E MA R T I N W O O D RO S E G A R D E N EN G L I S H O A K VIA M A D E R O S MAGELLAN C H A N T E L ANNE ATHERWOOD CA M I N O V I S T A RE G E N T CELESTE RANDOLPH LOCKSUNART MOLTZEN DA W S O N ST M A R K DEXTER BALDWIN OROGRANDE SQUIREWOOD LE O N A R D G R A N T VI A L O M B A R D I ST ANDR E W S VIA HUERTA WH I T E O A K WOODLARK AM E L I A LIVERPOOL DEAN KE N N E W I C K BL A Z I N G W O O D PATRIOT HOLLY OAK MC G R E G O R JULIE FOLKESTONE BLA C K O A K MARSHALL C O L O N Y H I L L S OAKVIEW WE Y M O T H JO L L Y M A N BROOKWELL CALABAZAS PARK VILLA STEVENS M I R A M O N T E KODIAK ES Q U I R E MILLARD RA M O N A D O R O T H Y A N N E WI L L CI T A T I O N SQUIREHILL SC E N I C H E I G H T S MACKENZIE WESTMOOR AUGUS T WALNUT BIGOAK NA R C I S O CEDAR TREE BR E W E R KRING SORENSON V I L L A D E A N Z A BERLAND SILVER OAK OCTOBER B R O O K V A L E PINE B R O O K WE S T H I L L VI A S O R R E N T O CA R O L L E E WISTARIA FO R T B A K E R CEDARBROOK RI E D E L GLENTREE WALLIN MELLO EL P R A D O F L O R E N C E DUCKETT TE R R A B E L L A JUNIPE R TWILIGHT T R E S S L E R CY P R E S S NOONAN RIT A N N A STARRETT OAKDELL PA R K S I D E GA L W A Y TO N I MURIEL EDMINTON NO R T H S K Y FALL BI A N C H I LAMBETH NORTHWIND MA N I T A CO T T O N W O O D MA D R I D OR L I N E A L I C I A S I E R R A S P R I N G LO C H L O M O N D MA R I A R O S A NO R T H P O I N T CLEO CALLE DE BARCELONA CH A R S A N PALO M A E L D E R W O O D AM I S T A D AL B A T R O S S AN N E T T E EVULICH GR O V E L A N D UN I T E D GARDENVIEW CORTE MADERA ON T A R I O VENTANA WILLOWGROVE MACADAM VARIAN VIA PALAMO S BALUST R O L CR O W N ROLLINGDELL ORCHARD LO C K H A V E N EL S E R E N O COZETTE SUTTON PARK OAKN O L L SW E E T O A K LA M O N T PA R K C I R C L E ME L I S S A TULITA SUNDERLAND QUEENS OAK VI A P A V I S O RO N A L D ECHO HILL SER E N O PI N O L E PR I V A T E S T CLU B H O U S E MURANO DANIEL PLUM BLOSSOM DO V E O A K NI G H T I N G A L E COLLINGSWORTH CORY PE R A L T A WH I T E F I R GARDENSIDE BEAV E N SHADY OAK PRING NO R T H F O R D E W E S T S H O R E CA L I F O R N I A O A K EA T O N VI R G I N I A S W A N LU C K Y O A K LI B E R T Y P I N N T A G E LA PLAYA AC A C I A CARNOU S T I E G R I N E L L OA K S P R I N G PARKVIEW MO S S Y O A K BY E R L Y LA J O L L A CATALANO OASIS SAKURA MC L A R E N CARRIAGE RIFREDI NO R T H S E A L SW A N O A K ORANGEWOOD MAPLETREE SEEBER CARTWRIGHT CH E T A M O N CLO V E R L Y RE D O N D O SH A S T A S P R I N G TOMKI CLASSIC LANGPORT R I V I E R A MINE DR E A OL D T O W N BRENDA MO N T E R E Y BENET T I NORTHVIEW CE D A R S P R I N G OAK MEADOW RA N C H O TAMARIND CAP I L L A KR I S T A CH A D W I C K CONRADIA VE R N I E REINELL CREEKSIDERIVERCREST KINST L E O N G ALD E R N E Y AM A D O R O A K WINDSOR MI R A V I S T A CYNTHIA X X X AR L I N G T O N BO N N Y KIMBERLY RA I N B O W FO R G E RA N D Y AV O N D A L E XX X FI R ME A D O W PE A C O C K NEWSOM BARNHART XXX SILVER OAK HOWARD XXX CA R M E N S T E V E N S C R E E K XXX X X X LA H E R R A N JOHN PA L O M A GL E N C O E MA R Y MA R I A N I XX X DE O D A R A XX X IM P E R I A L XXX BU B B BOLLI N G E R HERON XXX XX X XXX RIVER S I D E XX X AS T E R XXX XXX VI S T A LI N D A V I S T A PACIFICA KI N T Y R E POPPY LO C K W O O D RAINBOW CRAIG ME R R I M A N XX X YO R K S H I R E IMPERIAL Crossroads Area 1 4 3 2 5 6 7 STEVENS CREEK BLVD ST E L L I N G R D BU B B R D DE A N Z A B L V D PROSPECT RD LI N D A V I S T A D R TERRACE DR MCC L E L L A N FO O T H I L L B L V D ST E V E N S C R E E K B L V D BL A N E Y A V E HOMESTEAD RD WO L F E R D PRUNE RI D GE TA N T A U A V E VALLC O PKYPE R I M E T E R R D PE R I M E T E R R D TA N T A U A V E BARNHART AVE JOH N S O N A V E BOLLINGER RD ST E L L I N G R D Garden Gate DE A N Z A B L V D HOMESTEAD RD LA W R E N C E E X P Y RAINBOW DR BL A N E Y A V E ST E L L I N G A V E MI L L E R A V E TA N T A U A V E MCCLELLAN RD PROSPECT RD RAINBOW DR Deep Cli Golf Course Linda Vista Park Rancho San Antonio Open Space Preserve Gate of Heaven Cemetary Varian Park Cupertino Sports Center Jollyman Park Three Oaks Park Hoover Park Creekside Park Wilson Park Sterling Barnhart Park Rancho Rinconada County Park Portal Park Somerset Park Monta Vista Park Blackberry Farm Golf Course McClellan Ranch Park Fremont Older Open Space Preserve Franco Park Lincoln Elementary School Kennedy Middle School Monta Vista High School Regnart Elementary School Eaton Elementary School Saint Joseph of Cupertino School Garden Gate Elementary School Stevens Creek Elementary School William Faria Elementary School Sedgwick Elementary School Montebello Elementary School Lawson Middle School Collins Elementary School Hyde Middle School Cupertino High School Homestead High School City Hall De Anza College Apple Campus 2280 85 280 280 85 85 85 CUPERTINO SUNNYVALE SARATOGA WEST VALLEY SANTA CLARA ·········· Development Allocation Commercial..........70,000 s.f. Oce....................10,000 s.f. Hotel.....................125 rooms Residential............200 units Homestead Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 10 (between Blaney and Blue Jay), 20 (between Blue Jay and De Anza, and north side of Homestead between De Anza and Franco), 35 (south side of Homestead between De Anza and Stelling) and 15 (between Stelling and Sunnyvale) units per acre Maximum Height 30 feet, or 45 feet (south side between De Anza and Stelling) Development Allocation Commercial..........50,000 s.f. Oce....................30,000 s.f. Hotel.....................100 rooms Residential............100 units North Vallco Park Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 60 feet Development Allocation Commercial..........500,000 s.f. Oce....................315,000 s.f. Hotel.....................375 rooms Residential............1,000 units Heart of the City Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 or 35 (South Vallco) units per acre Maximum Height 45 feet Development Allocation Commercial..........10,000 s.f. Oce....................25,000 s.f. Hotel.....................none Residential............170 units North De Anza Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 45 feet Development Allocation Commercial..........50,000 s.f. Oce....................10,000 s.f. Hotel.....................none Residential...........150 units South De Anza Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 30 feet Citywide Development Summary Existing Alternative A Dierence 17,113 s.f. 390,000 s.f. 695,629 s.f. 680,000 s.f. 339 rooms 600 rooms 1416 units 1620 units 523,118 s.f. 650,231 s.f. 5,784 s.f. 21,413 s.f. 0 0 479 units 275 units 540,231 s.f. 1,040,231 s.f. 701,413 s.f. 701,413 s.f. 339 rooms 600 rooms 1,895 units 1,895 units Citywide Development Allocation 17,113 s.f. 390,000 s.f. 695,629 s.f. 680,000 s.f. 339 rooms 600 rooms 1,416 units 1,620 units 523,118 s.f. 650,231 s.f. 5,784 s.f. 21,413 s.f. 0 0 479 units 275 units 540,231 s.f. 1,040,231 s.f. 701,413 s.f. 701,413 s.f. 339 rooms 600 rooms 1,895 units 1,895 units Major Corridors Built/Approved Oce Commercial Hotel Residential Other Special Areas* Oce Commercial Hotel Residential Total Oce Commercial Hotel Residential +372,887 s.f. - 15,629 s.f. +261 rooms +204 units +127,113 s.f. +15,629 s.f. 0 - 204 units +500,000 s.f. 0 +261 rooms 0 * Includes Bubb Road, Fairgrove, Monta Vista, Oak Valley, other neighborhoods, major employers and other commercial/mixed-use centers, as dened in the 2005 General Plan. Remaining in Existing GP Alternative A Dierence 8,929,774 s.f. 3,729,569 s.f. 1,090 rooms 21,399 units ·· Development Allocation Commercial..........250,000 s.f. Oce....................25,000 s.f. Hotel.....................150 rooms Residential............400 units Homestead Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density Up to 35 units per acre Maximum Height 30 feet, or 45 feet (south side between De Anza and Stelling) Development Allocation Commercial..........100,000 s.f. Oce....................75,000 s.f. Hotel.....................150 rooms Residential............350 units North Vallco Park Special Area Primary Uses Commercial, Oce, Residential Maximum Residential Density 25 or 65 (Hamptons site) units per acre Maximum Height 60 feet Development Allocation Commercial..........750,000 s.f. Oce....................1,500,000 s.f. Hotel.....................439 rooms Residential............1,700 units Heart of the City Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 or 35 (Vallco, Stevens Creek Oce Center, Marina Foods, and the Oaks) units per acre Maximum Height 45 feet Development Allocation Commercial..........25,000 s.f. Oce....................200,000 s.f. Hotel.....................100 rooms Residential............170 units North De Anza Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 60 feet Development Allocation Commercial..........125,000 s.f. Oce....................25,000 s.f. Hotel.....................none Residential............201 units South De Anza Special Area ·· Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 30 feet ** Net new commercial is not proposed - it is assumed that the existing Vallco Mall square footage (1,267,601 s.f.) will be demolished and that 625,335 s.f. would be reserved for future projects. ·········· Citywide Development Summary Existing Alternative A Dierence 17,113 s.f. 390,000 s.f. 695,629 s.f. 680,000 s.f. 339 rooms 600 rooms 1416 units 1620 units 523,118 s.f. 650,231 s.f. 5,784 s.f. 21,413 s.f. 0 0 479 units 275 units 540,231 s.f. 1,040,231 s.f. 701,413 s.f. 701,413 s.f. 339 rooms 600 rooms 1,895 units 1,895 units Citywide Development Allocation Major Corridors Built/Approved Oce Commercial Hotel Residential Other Special Areas* Oce Commercial Hotel Residential Total Oce Commercial Hotel Residential Remaining in Existing GP Alternative B Dierence 8,929,775 s.f. 3,729,569 s.f. 1,090 rooms 21,399 units + 1,807,887 s.f. + 554,371 s.f. ** + 500 rooms + 1,405 units + 192,113 s.f. + 87,895 s.f. ** 0 + 16 units + 2,000,000 s.f. + 642,266 s.f. ** + 500 rooms + 1,421 units 17,113 s.f. 1,825,000 s.f. 695,629 s.f. 1,250,000 s.f. 339 rooms 839 rooms 1,416 units 2,821 units 523,118 s.f. 715,231 s.f. 5,784 s.f. 93,679 s.f. 0 0 479 units 495 units 540,231 s.f. 2,540,231 s.f. 701,413 s.f. 1,343,679 s.f. 339 rooms 839 rooms 1,895 units 3,316 units * Includes Bubb Road, Fairgrove, Monta Vista, Oak Valley, other neighborhoods, major employers and other commercial/mixed-use centers, as dened in the 2005 General Plan. Note: Housing Element sites may have dierent densities as noted. ·· Development Allocation Commercial..........250,000 s.f. Oce....................25,000 s.f. Hotel.....................300 rooms Residential............530 units Homestead Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 10 (between Blaney and Blue Jay); 20 (between Blue Jay and De Anza; and north side of Homestead between De Anza and Franco); 35 (south side of Homestead between De Anza and Stelling); and 15 (between Stelling and Sunnyvale) units per acre Maximum Height 30 feet (see Stelling Gateway notes for Maximum Heights East of Stelling) Development Allocation Commercial..........100,000 s.f. Oce....................75,000 s.f. Hotel.....................300 rooms Residential............825 units North Vallco Park Special Area Primary Uses Commercial, Oce, Residential Maximum Residential Density 25 or 65 (See Nodes/Gateways) units per acre Maximum Height 60 feet Development Allocation Commercial..........750,000 s.f. Oce....................500,000 s.f. Hotel.....................264 rooms Residential............1,500 units Heart of the City Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 or 35 (See Nodes/Gateways) units per acre Maximum Height Up to 45 feet Development Allocation Commercial..........25,000 s.f. Oce....................200,000 s.f. Hotel.....................100 rooms Residential............170 units North De Anza Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 60 feet Development Allocation Commercial....... - 607774 s.f. Oce....................1,000,000 s.f. Hotel.....................375 Residential............600 units ·· Primary Uses Commercial, Oce and Residential Maximum Residential Density 35 units per acre Maximum Height West of Wolfe 45 feet; or 60 feet with a retail component; or 75 feet for a 200 foot depth along the Wolfe Road property line and setback from the Stevens Creek Boulevard property line with retail and community benets East of Wolfe 60 feet; or 75 feet with retail; or 90 feet with community benets ** Net new commercial is not proposed - it is assumed that the existing Vallco Mall square footage (1,207,774 s.f.) will be demolished and that 600,000 s.f. would be reserved for future projects. ·········· Citywide Development Summary Existing Alternative A Dierence 17,113 s.f. 390,000 s.f. 695,629 s.f. 680,000 s.f. 339 rooms 600 rooms 1416 units 1620 units 523,118 s.f. 650,231 s.f. 5,784 s.f. 21,413 s.f. 0 0 479 units 275 units 540,231 s.f. 1,040,231 s.f. 701,413 s.f. 701,413 s.f. 339 rooms 600 rooms 1,895 units 1,895 units Citywide Development Allocation Major Corridors Built/Approved Oce Commercial Hotel Residential Other Special Areas* Oce Commercial Hotel Residential Total Oce Commercial Hotel Residential Remaining in Existing GP Balanced Plan Dierence 8,929,775 s.f. 3,729,569 s.f. 1,090 rooms 21,399 units + 1,685,939 s.f. + 538,248 s.f. ** + 1,275 rooms + 2,511 units + 361,882 s.f. + 69,526 s.f. ** 0 + 16 units + 2,000,000 s.f. + 607,774 s.f. ** + 1,000 rooms + 2,526 units 30,708 s.f. 1,668,826 s.f. 732,697 s.f. 1,270,945 s.f 339 rooms 1,339 rooms 1,490 units 4,001 units 523,118 s.f. 885,000 s.f. 0 s.f. 69526 s.f. 0 0 479 units 495 unit 553,826 s.f. 2,553,826 s.f. 732,697 s.f. 1,340,471 s.f. 339 rooms 1,339 rooms 1,882 units 4,421 units * Includes Bubb Road, Fairgrove,, Oak Valley, other neighborhoods, major employers and other commercial/mixed-use centers, as dened in the 2005 General Plan. Note: Housing Element sites may have dierent densities as noted. Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 30 feet or 45 feet for Housing Element Site at Summer Winds/Graniterock/Jack in the Box Development Allocation Commercial..........125,000 s.f. Oce....................25,000 s.f. Hotel.....................none Residential............275 units South De Anza Special Area Development Allocation Commercial..........20,945 s.f. Oce....................23,826 s.f. Hotel.....................none Residential............101 units Primary Uses Commercial, Oce and Residential Maximum Residential Density Up to 15 units per acre Maximum Height 30 feet Oaks Gateway Primary Uses Commercial, Oce and Residential Maximum Residential Density 35 units per acre Maximum Height 45 feet, or 60 feet with a retail component North Crossroads Node Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre; 35 units per acre if Housing Element Site Maximum Height 45 feet, or 60 feet with a retail component City Center Node Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 60 feet, 75 feet with a retail component. = 90 feet with retail and community benets South Vallco Park Gateway Primary Uses Commercial, Oce and Residential Maximum Residential Density 35 units per acre Maximum Height 45 feet, or 60 feet with a retail component North Vallco Gateway Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre (65 units per acre if Housing Element site) Maximum Height West of Wolfe 60 feet = 90 feet for a 200 foot depth along Wolfe Road property line for a hotel with major convention center with community benets East of Wolfe 75 feet Buildings with 50 feet of property lines abutting Wolfe Road, Pruneridge Ave. and Apple Campus 2 site shall not exceed 60 feet. North De Anza Gateway Primary Uses Commercial Maximum Residential Density 35 units per acre Maximum Height 60 feet, or 75 feet with a retail component. 95 feet for a hotel with major convention center and community benets Stelling Gateway Primary Uses Commercial and Residential East of Stelling Maximum Residential Density Up to 35 units per acre Maximum Height 45 feet, or 60 feet with a retail component * * * * * * * * Monta Vista Village Special Area Vallco Shopping District Special Area 100,000 s.f. 200 rooms 200 units Development Allocation Commercial..........250,000 s.f. Oce....................50,000 s.f. Hotel.....................300 rooms Residential............530 units Homestead Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density Up to 35 units per acre Maximum Height 30 feet, or 45 feet (south side between De Anza and Stelling) Development Allocation Commercial..........100,000 s.f. Oce....................90,000 s.f. Hotel.....................300 rooms Residential............825 units North Vallco park Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 60 feet Development Allocation Commercial..........750,000 s.f. Oce....................2,700,000 s.f. Hotel.....................639 rooms Residential............2,100 units Heart of the City Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 or 35 (South Vallco) units per acre Maximum Height 45 feet Development Allocation Commercial..........25,000 s.f. Oce....................400,000 s.f. Hotel.....................100 rooms Residential............170 units North De Anza Special Area Primary Uses Oce Maximum Residential Density 25 units per acre Maximum Height 75 feet Development Allocation Commercial..........125,000 s.f. Oce....................50,000 s.f. Hotel.....................none Residential............275 units South De Anza Special Area Primary Uses Oce Maximum Residential Density 25 units per acre Maximum Height 30 feet ·········· Citywide Development Summary Existing Alternative A Dierence 17,113 s.f. 390,000 s.f. 695,629 s.f. 680,000 s.f. 339 rooms 600 rooms 1416 units 1620 units 523,118 s.f. 650,231 s.f. 5,784 s.f. 21,413 s.f. 0 0 479 units 275 units 540,231 s.f. 1,040,231 s.f. 701,413 s.f. 701,413 s.f. 339 rooms 600 rooms 1,895 units 1,895 units Citywide Development Allocation Major Corridors Built/Approved Oce Commercial Hotel Residential Other Special Areas* Oce Commercial Hotel Residential Total Oce Commercial Hotel Residential Remaining in Existing GP Alternative C Dierence 8,929,775 s.f. 3,729,569 s.f. 1,090 rooms 21,399 units + 3,272,887 s.f. + 554,371 s.f. + 1,000 rooms + 2,484 units + 227,113 s.f. + 87,895 s.f. 0 + 42 units + 3,500,000 s.f. + 642,266 s.f. + 1,000 rooms + 2,526 units 17,113 s.f. 3,290,000 s.f. 695,629 s.f. 1,250,000 s.f. 339 rooms 1,339 rooms 1,416 units 3,900 units 523,118 s.f. 750,231 s.f. 5,784 s.f. 93,679 s.f. 0 0 479 units 521 units 540,231 s.f. 4,040,231 s.f. 701,413 s.f. 1,343,679 s.f. 339 rooms 1,339 rooms 1,895 units 4,421 units * Includes Bubb Road, Fairgrove, Monta Vista, Oak Valley, other neighborhoods, major employers and other commercial/mixed-use centers, as dened in the 2005 General Plan. ** Net new commercial is not proposed - it is assumed that the existing Vallco Mall square footage (1,267,601 s.f.) will be demolished and that 625,335 s.f. would be reserved for future projects. Note: Housing Element sites may have dierent dnsities as noted. North De Anza Gateway NodeStelling Gateway Node Crossroads Node South Vallco Gateway Node City Center Node North Vallco Gateway Node STEVENS CREEK BLVD DE A N Z A B L V D DE A N Z A B L V D HOMESTEAD RD Stelling Gateway Primary Uses Commercial and Residential Maximum Residential Density 35 units per acre (east side of Stelling), 15 units per acre (west side of Stelling) Maximum Height 30 (west side of Stelling) or 45 (east side of Stelling) feet Oaks Gateway Primary Uses Commercial and Residential Maximum Residential Density 25 units per acre Maximum Height 45 feet North Crossroads Node Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 45 feet City Center Node Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 45 feet South Vallco Park Gateway West Primary Uses Commercial, Oce and Residential Maximum Residential Density 35 units per acre Maximum Height 45 feet, or 60 feet with a retail component South Vallco Park Gateway East Primary Uses Commercial, Oce and Residential Maximum Residential Density 35 units per acre Maximum Height 45 feet, or 60 feet with a retail component North Vallco Gateway Primary Uses Commercial and Oce Maximum Residential Density 25 units per acre Maximum Height 60 feet North De Anza Gateway Primary Uses Commercial Maximum Residential Density 35 units per acre Maximum Height 45 feet North Crossroads Node Primary Uses Commercial, Oce and Residential Maximum Residential Density 40 units per acre Maximum Height 60 feet, or 75 with a retail component City Center Node Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 75 feet, or 90 feet with a retail component, = 110 feet with retail and project-wide/ community benets South Vallco Park Gateway East Primary Uses Commercial, Oce and Residential Maximum Residential Density 35 units per acre Maximum Height 75 feet or 90 feet with retail, = 160 feet with retail and project-wide/ community benets North Vallco Gateway Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre (110 units per acre for Hamptons Site) Maximum Height 60 feet, or 75 feet with a retail component (retail not required east of Wolfe Rd), or 85 feet with no retail for the Hamptons = 130 feet along Wolfe Rd with retail and project-wide/community benets North De Anza Gateway Primary Uses Commercial Maximum Residential Density 35 units per acre Maximum Height 60 feet, or 75 feet with a retail component, 145 feet with retail and project-wide/ community benets South Vallco Park Gateway West Primary Uses Commercial, Oce and Residential Maximum Residential Density 35 units per acre Maximum Height 60 feet, or 75 with a retail component, or 85 feet along Stevens Creek Blvd and Wolfe Rd with retail and project-wide/community benets Stelling Gateway Primary Uses Commercial and Residential Maximum Residential Density 35 units per acre Maximum Height 45 feet, or 60 feet with a retail component Oaks Gateway Primary Uses Commercial, Oce and Residential Maximum Residential Density 35 units per acre Maximum Height 60 feet, or 75 feet with a retail component * ** * * * * * * * 08001600 2400 Feet N Legend City Boundary Key Intersections Alternative A revised 6.9.14 Legend City Boundary Key Intersections Balanced Plan revised 10.20.14 Additional height allowances w/ retail and community benets Legend City Boundary BRT Stop (for environmental analysis) BRT Line (for environmental analysis) Key Intersections * Additional height allowances w/ retail and project-wide benets Alternative C revised 6.9.14 Primary Uses Oce Maximum Residential Density 25 units per acre Maximum Height 45 feet Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 45 feet 45 feet, 60 feet if there is a retail Homestead Corridor Development Allocation Commercial......... Oce.................... no additional Hotel.................... Residential........... De Anza South Corridor De Anza North Corridor Development Allocation Commercial..........200,000 s.f. Oce....................250,000 s.f Hotel.....................no additional Residential............no additional Primary Uses Oce Maximum Residential Density 25 units per acre Maximum Height 45 feet Wolfe Corridor Primary Uses Commercial, Oce and Residential Maximum Residential Density 35 units per acre Maximum Height 45 feet, 60 feet if there is a retail component Development Allocation Commercial......... 300,000 s.f. Oce....................790,000 s.f. Hotel.....................190,000 s.f. Residential...........no additional Stevens Creek Corridor Development Allocation Commercial......... Oce................... Hotel.................... Residential........... 100,000 s.f. no additional no additional 2,200,000 s.f. Primary Uses Commercial, Medium-High Density Residential, and Public/Quasi-Public Maximum Residential Density 35 units per acre Maximum Height 45 feet, 60 feet if there is a retail component Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 45 feet 45 feet, 60 feet if there is a retail Development Allocation Commercial..........200,000 s.f. Oce....................250,000s.f Hotel.....................no additional Residential............no additional Sunnyvale Saratoga Development Allocation Commercial......... Oce................... Hotel.................... Residential........... 995 Legend tran_Road ST_TYPE Arterials Driveways Freeways Local Roads Collectors DE A N Z A JUNIPERO SERRA ST E L L I N G STEVENS CREEK HOMESTEAD TA N T A U W E S T V A L L E Y BL A N E Y BU B B FO O T H I L L WO L F E PROSPECT MCCLELLAN STEVENS CAN Y O N MI L L E R XX X LA W R E N C E M A R Y BOLLINGER ALVES MONTEBELLO JO H N S O N VOSS ES T A T E S LOREE REG N A R T PO R T A L TILSON HY D E JU D Y BR E T MA N N PRUNERIDGE LORNE FI N C H BY R N E RODRIGUES MERRITT BA N D L E Y ST E R N VAI WU N D E R L I C H KIRWIN KI M OR A N G E C R E S T O N COLUMBUS PHIL SC E N I C PO P P Y WR I G H T STOKE S VALLCO BARK BE A R D O N CO L B Y WE Y B U R N LA MAR ERIN PH A R L A P R A E C R I S T O R E Y S T E R L I N G LI N N E T D E O D A R A PALM FA R A L L O N E HE R O N BALBOA VI S T A LAZANEO CA L V E R T GIA N N I N I CHIALA RAINBOW SALEM GREENLEAF CA S T I N E WHEATON LA N C E R AL P I N E BO N N Y DE N I S O N PR I M R O S E LA R R Y AI N S W O R T H MA X I N E F E S T I V A L WI N D S O R LA R K RA N D Y BLUE HILL TERRACE GLE N V I E W SCOFIELD FARGO LI N D A V I S T A MARIANI 280 F W Y R A M P WI L K I N S O N VALLEY GREEN SHELLY K E N T W O O D N O E L STAFF O R D S A N J U A N HYANNISPORT DUMAS GALLI BL U E J A Y ALCALDE GASC O I G N E HA R L A N TIPTOE PRICE DE FOE PE R I M E T E R ALCAZAR CR A I G RIC H W O O D ARATA DUNBAR KEN T SE P T E M B E R O A K V A L L E Y MELVI N WE S T L Y N N PE A C O C K SUISUN PENDLETON SA N T A T E R E S A CUPERTINO SUNRISE L I N D Y JO H N HI L L S D A L E HU B B A R D UP L A N D CA R V E R NEWSOM FL O R A V I S T A ARB O R E T U M LILAC TOMPKINS MI N E R JANICE ANCOCK LUCILLE VI S T A K N O L L DE SOTO LO W E L L LONDONDERRY HI G H L A N D S ST J O S E P H PR O U T Y MO R E T T I HANFORD FALLEN LEAF TU L A PRESIDIO KI M B E R L Y P E N I N S U L A MA R T I N SA I C H ROSARIO M I L K Y WOOD S PORT O L A MA R I A BAH L BE T T E BARNHART PHYLLIS CASTANO PACIFICA AMAPOLA LA R O D A DRAKE LO C K W O O D D E M P S T E R COR D O V A BE T L I N ASPEN M A D E R A SA M E D R A FOREST SW A L L O W WINDIM E R PA S A D E N A TUGGLE PENDERGAST FORGE C A N Y O N O A K AN T O N S A N T A L U C I A LO N N A LI L Y PL U M T R E E CY N T H I A C E D A R WATERFORD SULLIVAN BE R N A R D O H I L L C R E S T LOMITA BELVEDERE E L M S F O R D MI R A V I S T A AR L I N G T O N RED W O O D GARDEN GATE TO N I T A CA R M E N N O V E M B E R PA L O V I S T A OA K T R E E HANNA A V E N I D A ST M A R Y ' S CO R V E T T E MINE T T E CLAY ME A D O W OLIVE MILFORD EDWARD PINEV I L L E NO R W I C H S Y C A M O R E AV O N D A L E ME N H A R T CASTLETON AN N A R B O R S C O T L A N D CLARENDON MEDINA ST E N D H A L FE L T O N ME R R I M A N PA R L E T T BREN T OAKVI L L E STARLING BEE C H W O O D SWISS CRE E K W A L L A C E JA M E S T O W N SOMERSET BELKNAP BARRA N C A AN N NORTHWOOD AL L E Y HO W A R D SILVERADO AL D E R B R O O K YO R K S H I R E RO S E B L O S S O M CHERYL ST O N E H E A V E N SHARON B E A U C H A M P S A R R O W H E A D RIVERSI D E LA CONNER LAURETTA HEATHERWOOD BA X T E R AD R I A N A VI A R O N C O L E MAUREEN MELODY CORONADO TE R R Y W I I N S T O N BIXBY AMULET MEIGGS VINEYAR D CUL B E R T S O N WE S T A C R E S BA Y W O O D SHADOWHILL RUMFORD PA R K W O O D NO R A N D A SHASTA LEEDS E M P I R E GILLIC K LONGDOWN BEEKMAN ST F R A N C I S HO L L E N B E C K SAN FERNANDO BLU E H I L L S AMHERST VIC K S B U R G AN S O N HU N T E R S T O N DAVISO N GRENOLA KI N T Y R E NORMANDY BENTOAK PAYETTE ELM F I R LA H E R R A N TU L I P A N A S T E R TO R R E LE B A N O N CRA F T CHRISTENSEN STANFORD DOLORES MO N T C L A I R POCATELLO AL H A M B R A C E M E T E R Y GL E N HU D S O N BE L L E V I L L E HU N T I N G T O N SE Q U O I A GRANADA RICARDO HAZELBROOK OA K C R E E L EDSEL HERMOSA HARTMAN MO R E N G O FR A N C O GARDENA VIA VICO CLIFDEN ORION CA S S DA N B U R Y NEWCASTLE LA S A L L E S A N T A C L A R A LA U R E N T I A N DE R B Y S H I R E RAMPA R T ROBINDELL H E N E Y C R E E K CA N A R Y SHADYGROVE DARTMOOR SANTA PAULA CA L G A R Y PUMPKIN DR Y D E N KRZICH PEPPER TREE HI B I S C U S RU P P E L L PA R I S H FE R N G R O V E PEACH BLOSSOM DEVON WOODRIDGE SERRA R E S U L T S FR I A R S METEOR IM P E R I A L CH A C E PI N E C R E S T E D D I N G T O N BUR N E T T LAS ONDAS CREEKLINE BU C K T H O R N E MERC E D E S LA P A L O M A IN F I N I T E L O O P GREENWOOD M I M O S A FI R W O O D GL E N C O E SELKIRK LA N S D A L E C R I C K E T H I L L SOLA ME A D O W L A R K TU S C A N Y CO L D H A R B O R AN D O V E R M A N Z A N I T A OL M O WH I T N E Y BR O O K G R O V E PARNELL HALL DE LA FARGE PE N I N S U L A R GRAND STA U F F E R ORANGE BLOSSOM WOODV I E W RALYA PEAR TREE CR E S T L I N E QU A I L KE S T E R RI D G E V I E W PR U N E T R E E DONEGAL CLI F F O R D ACADIA ALMADEN WE S T E R N HAM M O N D RUCKER ST O N Y D A L E JO H A N S E N NILE LO N G F E L L O W LI N D S A Y KA M S A C K WOODBURY CALI CARLYSLE BA N F F APPLE TREE SHE T L A N D MONROVIA CODY HA L E AUBURN ELENDA MY E R CH E L M S F O R D OX F O R D JA C Q U E L I N E WILDFLOWER BA R B A R A GREENOAK CART A B L A N C A PA R A D I S E LINDE N B R O O K W O O D H I L L LA GRANDE CH E R R Y T R E E HOLLANDERRY SHATTUCK TWIG NE W B R U N S W I C K KINGSBURY MONTE SA R A T O G A S U N N Y V A L E RUNO PR A D O V I S T A OLIVEWOOD CL A R K S T O N MASO N M A D R O N E MA R T I N W O O D RO S E G A R D E N EN G L I S H O A K VIA M A D E R O S MAGELLAN C H A N T E L ANNE ATHERWOOD CA M I N O V I S T A RE G E N T CELESTE RANDOLPH LOCKSUNART MOLTZEN DA W S O N ST M A R K DEXTER BALDWIN OROGRANDE SQUIREWOOD LE O N A R D G R A N T VI A L O M B A R D I ST ANDR E W S VIA HUERTA WH I T E O A K WOODLARK AM E L I A LIVERPOOL DEAN KE N N E W I C K BL A Z I N G W O O D PATRIOT HOLLY OAK MC G R E G O R JULIE FOLKESTONE BLA C K O A K MARSHALL C O L O N Y H I L L S OAKVIEW WE Y M O T H JO L L Y M A N BROOKWELL CALABAZAS PARK VILLA STEVENS M I R A M O N T E KODIAK ES Q U I R E MILLARD RA M O N A D O R O T H Y A N N E WI L L CI T A T I O N SQUIREHILL SC E N I C H E I G H T S MACKENZIE WESTMOOR AUGUS T WALNUT BIGOAK NA R C I S O CEDAR TREE BR E W E R KRING SORENSON V I L L A D E A N Z A BERLAND SILVER OAK OCTOBER B R O O K V A L E PINE B R O O K WE S T H I L L VI A S O R R E N T O CA R O L L E E WISTARIA FO R T B A K E R CEDARBROOK RI E D E L GLENTREE WALLIN MELLO EL P R A D O F L O R E N C E DUCKETT TE R R A B E L L A JUNIPE R TWILIGHT T R E S S L E R CY P R E S S NOONAN RIT A N N A STARRETT OAKDELL PA R K S I D E GA L W A Y TO N I MURIEL EDMINTON NO R T H S K Y FALL BI A N C H I LAMBETH NORTHWIND MA N I T A CO T T O N W O O D MA D R I D OR L I N E A L I C I A S I E R R A S P R I N G LO C H L O M O N D MA R I A R O S A NO R T H P O I N T CLEO CALLE DE BARCELONA CH A R S A N PALO M A E L D E R W O O D AM I S T A D AL B A T R O S S AN N E T T E EVULICH GR O V E L A N D UN I T E D GARDENVIEW CORTE MADERA ON T A R I O VENTANA WILLOWGROVE MACADAM VARIAN VIA PALAMO S BALUST R O L CR O W N ROLLINGDELL ORCHARD LO C K H A V E N EL S E R E N O COZETTE SUTTON PARK OAKN O L L SW E E T O A K LA M O N T PA R K C I R C L E ME L I S S A TULITA SUNDERLAND QUEENS OAK VI A P A V I S O RO N A L D ECHO HILL SER E N O PI N O L E PR I V A T E S T CLU B H O U S E MURANO DANIEL PLUM BLOSSOM DO V E O A K NI G H T I N G A L E COLLINGSWORTH CORY PE R A L T A WH I T E F I R GARDENSIDE BEAV E N SHADY OAK PRING NO R T H F O R D E W E S T S H O R E CA L I F O R N I A O A K EA T O N VI R G I N I A S W A N LU C K Y O A K LI B E R T Y P I N N T A G E LA PLAYA AC A C I A CARNOU S T I E G R I N E L L OA K S P R I N G PARKVIEW MO S S Y O A K BY E R L Y LA J O L L A CATALANO OASIS SAKURA MC L A R E N CARRIAGE RIFREDI NO R T H S E A L SW A N O A K ORANGEWOOD MAPLETREE SEEBER CARTWRIGHT CH E T A M O N CLO V E R L Y RE D O N D O SH A S T A S P R I N G TOMKI CLASSIC LANGPORT R I V I E R A MINE DR E A OL D T O W N BRENDA MO N T E R E Y BENET T I NORTHVIEW CE D A R S P R I N G OAK MEADOW RA N C H O TAMARIND CAP I L L A KR I S T A CH A D W I C K CONRADIA VE R N I E REINELL CREEKSIDERIVERCREST KINST L E O N G ALD E R N E Y AM A D O R O A K WINDSOR MI R A V I S T A CYNTHIA X X X AR L I N G T O N BO N N Y KIMBERLY RA I N B O W FO R G E RA N D Y AV O N D A L E XX X FI R ME A D O W PE A C O C K NEWSOM BARNHART XXX SILVER OAK HOWARD XXX CA R M E N S T E V E N S C R E E K XXX X X X LA H E R R A N JOHN PA L O M A GL E N C O E MA R Y MA R I A N I XX X DE O D A R A XX X IM P E R I A L XXX BU B B BOLLI N G E R HERON XXX XX X XXX RIVER S I D E XX X AS T E R XXX XXX VI S T A LI N D A V I S T A PACIFICA KI N T Y R E POPPY LO C K W O O D RAINBOW CRAIG ME R R I M A N XX X YO R K S H I R E IMPERIAL Crossroads Area 1 4 3 2 5 6 7 STEVENS CREEK BLVD ST E L L I N G R D BU B B R D DE A N Z A B L V D PROSPECT RD LI N D A V I S T A D R TERRACE DR MCC L E L L A N FO O T H I L L B L V D ST E V E N S C R E E K B L V D BL A N E Y A V E HOMESTEAD RD WO L F E R D PRUNE RI D GE TA N T A U A V E VALLC O PKYPE R I M E T E R R D PE R I M E T E R R D TA N T A U A V E BARNHART AVE JOH N S O N A V E BOLLINGER RD ST E L L I N G R D Garden Gate DE A N Z A B L V D HOMESTEAD RD LA W R E N C E E X P Y RAINBOW DR BL A N E Y A V E ST E L L I N G A V E MI L L E R A V E TA N T A U A V E MCCLELLAN RD PROSPECT RD RAINBOW DR Deep Cli Golf Course Linda Vista Park Rancho San Antonio Open Space Preserve Gate of Heaven Cemetary Varian Park Cupertino Sports Center Jollyman Park Three Oaks Park Hoover Park Creekside Park Wilson Park Sterling Barnhart Park Rancho Rinconada County Park Portal Park Somerset Park Monta Vista Park Blackberry Farm Golf Course McClellan Ranch Park Fremont Older Open Space Preserve Franco Park Lincoln Elementary School Kennedy Middle School Monta Vista High School Regnart Elementary School Eaton Elementary School Saint Joseph of Cupertino School Garden Gate Elementary School Stevens Creek Elementary School William Faria Elementary School Sedgwick Elementary School Montebello Elementary School Lawson Middle School Collins Elementary School Hyde Middle School Cupertino High School Homestead High School City Hall De Anza College Apple Campus 2280 85 280 280 85 85 85 CUPERTINO SUNNYVALE SARATOGA WEST VALLEY SANTA CLARA ·········· Development Allocation Commercial..........250,000 s.f. Oce....................TBD Hotel.....................125 rooms Residential.......... REMOVE Homestead Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 10 (between Blaney and Blue Jay), 20 (between Blue Jay and De Anza, and north side of Homestead between De Anza and Franco), 35 (south side of Homestead between De Anza and Stelling) and 15 (between Stelling and Sunnyvale) units per acre Maximum Height 30 feet, or 45 feet (south side between De Anza and Stelling) Development Allocation Commercial..........100,000 s.f. Oce....................TBD Hotel.....................100 rooms Residential.......... REMOVE North Vallco Park Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 60 feet Development Allocation Commercial..........750,000 s.f. Oce....................TBD Hotel.....................100 rooms Residential.......... REMOVE Heart of the City Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 or 35 (South Vallco) units per acre Maximum Height Up to 45 feet Development Allocation Commercial.......... 25,000 s.f. Oce....................TBD Hotel..................... none Residential.......... REMOVE North De Anza Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 60 feet Development Allocation Commercial..........125,000 s.f. Oce....................TBD Hotel..................... none Residential.......... REMOVE South De Anza Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 30 feet; 45 feet for Summer Winds, Granite Rock, and Jack in the Box sites if adopted as Housing Element Sites Citywide Development Summary Existing Alternative A Dierence 17,113 s.f. 390,000 s.f. 695,629 s.f. 680,000 s.f. 339 rooms 600 rooms 1416 units 1620 units 523,118 s.f. 650,231 s.f. 5,784 s.f. 21,413 s.f. 0 0 479 units 275 units 540,231 s.f. 1,040,231 s.f. 701,413 s.f. 701,413 s.f. 339 rooms 600 rooms 1,895 units 1,895 units Citywide Development Allocation 30,708 s.f. TBD 732,697 s.f. 732,697 s.f. 339 rooms 1339 rooms 1,490 units REMOVED 523,118 s.f. TBD 0 s.f. 0 s.f. 0 0 405 units 553,826 s.f. 1,053,826 s.f. 732,697 s.f. 732,697 s.f. 339 rooms 1339 rooms 1,895 units REMOVED Major Corridors Built/Approved Oce Commercial Hotel Residential Other Special Areas* Oce Commercial Hotel Residential Total Oce Commercial Hotel Residential TBD 0 s.f. 1,000 rooms TBD 0 s.f. 0 +500,000 s.f. 0 s.f. +1,000 rooms * Includes Bubb Road, Fairgrove, Oak Valley, other neighborhoods, major employers and other commercial/mixed-use centers, as dened in the 2005 General Plan. Remaining in Planning Commission Dierence Existing GP Recommendation 8,929,774 s.f. 3,729,569 s.f. 1,090 rooms 21,399 units Development Allocation Commercial..........2,094 s.f. Oce....................TBD Hotel.....................none Residential.......... REMOVE Primary Uses Commercial, Oce and Residential Maximum Residential Density Up to 15 units per acre Maximum Height 30 feet Monta Vista Village Special Area Development Allocation Commercial.......... TBD Oce....................TBD Hotel..................... TBD Residential.......... REMOVE Primary Uses Commercial, Oce and Residential Maximum Residential Density 35 units per acre Maximum Height West of Wolfe - 45 feet; or 60 feet with a retail component East of Wolfe - 60 feet; or 75 feet with retail component Vallco Shopping District Special Area ·· Development Allocation Commercial..........250,000 s.f. Oce....................25,000 s.f. Hotel.....................150 rooms Residential............400 units Homestead Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density Up to 35 units per acre Maximum Height 30 feet, or 45 feet (south side between De Anza and Stelling) Development Allocation Commercial..........100,000 s.f. Oce....................75,000 s.f. Hotel.....................150 rooms Residential............350 units North Vallco Park Special Area Primary Uses Commercial, Oce, Residential Maximum Residential Density 25 or 65 (Hamptons site) units per acre Maximum Height 60 feet Development Allocation Commercial..........750,000 s.f. Oce....................1,500,000 s.f. Hotel.....................439 rooms Residential............1,700 units Heart of the City Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 or 35 (Vallco, Stevens Creek Oce Center, Marina Foods, and the Oaks) units per acre Maximum Height 45 feet Development Allocation Commercial..........25,000 s.f. Oce....................200,000 s.f. Hotel.....................100 rooms Residential............170 units North De Anza Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 60 feet Development Allocation Commercial..........125,000 s.f. Oce....................25,000 s.f. Hotel.....................none Residential............201 units South De Anza Special Area ·· Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 30 feet ** Net new commercial is not proposed - it is assumed that the existing Vallco Mall square footage (1,267,601 s.f.) will be demolished and that 625,335 s.f. would be reserved for future projects. ·········· Citywide Development Summary Existing Alternative A Dierence 17,113 s.f. 390,000 s.f. 695,629 s.f. 680,000 s.f. 339 rooms 600 rooms 1416 units 1620 units 523,118 s.f. 650,231 s.f. 5,784 s.f. 21,413 s.f. 0 0 479 units 275 units 540,231 s.f. 1,040,231 s.f. 701,413 s.f. 701,413 s.f. 339 rooms 600 rooms 1,895 units 1,895 units Citywide Development Allocation Major Corridors Built/Approved Oce Commercial Hotel Residential Other Special Areas* Oce Commercial Hotel Residential Total Oce Commercial Hotel Residential Remaining in Existing GP Alternative B Dierence 8,929,775 s.f. 3,729,569 s.f. 1,090 rooms 21,399 units + 1,807,887 s.f. + 554,371 s.f. ** + 500 rooms + 1,405 units + 192,113 s.f. + 87,895 s.f. ** 0 + 16 units + 2,000,000 s.f. + 642,266 s.f. ** + 500 rooms + 1,421 units 17,113 s.f. 1,825,000 s.f. 695,629 s.f. 1,250,000 s.f. 339 rooms 839 rooms 1,416 units 2,821 units 523,118 s.f. 715,231 s.f. 5,784 s.f. 93,679 s.f. 0 0 479 units 495 units 540,231 s.f. 2,540,231 s.f. 701,413 s.f. 1,343,679 s.f. 339 rooms 839 rooms 1,895 units 3,316 units * Includes Bubb Road, Fairgrove, Monta Vista, Oak Valley, other neighborhoods, major employers and other commercial/mixed-use centers, as dened in the 2005 General Plan. Note: Housing Element sites may have dierent densities as noted. ·· Development Allocation Commercial..........250,000 s.f. Oce....................25,000 s.f. Hotel.....................300 rooms Residential............530 units Homestead Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 10 (between Blaney and Blue Jay), 20 (between Blue Jay amd De Anza, and north side of HOmestead between De Anza and Franco), 35 (south side of HOmestead between De Anza amd Stelling) and 15 (between Stelling and Sunnyvale) units per acre Maximum Height 30 feet (see Stelling Gateway notes for Max. Heights East of Stelling) Development Allocation Commercial..........100,000 s.f. Oce....................75,000 s.f. Hotel.....................300 rooms Residential............825 units North Vallco Park Special Area Primary Uses Commercial, Oce, Residential Maximum Residential Density 25 or 65 (See Nodes/Gateways) units per acre Maximum Height 60 feet Development Allocation Commercial..........750,000 s.f. Oce....................500,000 s.f. Hotel.....................264 rooms Residential............1,500 units Heart of the City Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 or 35 (See Nodes/Gateways) units per acre Maximum Height 45 feet Development Allocation Commercial..........25,000 s.f. Oce....................200,000 s.f. Hotel.....................100 rooms Residential............170 units North De Anza Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 60 feet Development Allocation Commercial..........582,439 s.f. Oce....................1,000,000 s.f. Hotel.....................375 Residential............600 units Vallco Shopping District Special Area ·· Primary Uses Commercial, Oce and Residential Maximum Residential Density 35 units per acre Maximum Height West of Wolfe, 45 feet, or 60 feet with a retail component. 75 feet for a 200 foot depth along the Wolfe Road property line and setback from the Stevens Creek Boulevard property line with retial and community benets East of Wolf, 60 feet, or 75 feet with retail or 90 feet with community benets ** Net new commercial is not proposed - it is assumed that the existing Vallco Mall square footage (1,267,601 s.f.) will be demolished and that 625,335 s.f. would be reserved for future projects. ·········· Citywide Development Summary Existing Alternative A Dierence 17,113 s.f. 390,000 s.f. 695,629 s.f. 680,000 s.f. 339 rooms 600 rooms 1416 units 1620 units 523,118 s.f. 650,231 s.f. 5,784 s.f. 21,413 s.f. 0 0 479 units 275 units 540,231 s.f. 1,040,231 s.f. 701,413 s.f. 701,413 s.f. 339 rooms 600 rooms 1,895 units 1,895 units Citywide Development Allocation Major Corridors Built/Approved Oce Commercial Hotel Residential Other Special Areas* Oce Commercial Hotel Residential Total Oce Commercial Hotel Residential Remaining in Existing GP Alternative B Dierence 8,929,775 s.f. 3,729,569 s.f. 1,090 rooms 21,399 units + 1,685,939 s.f. + 569,532 s.f. ** + 1,275 rooms + 2,511 units + 361,882 s.f. + 104,018 s.f. ** 0 + 16 units + 2,000,000 s.f. + 642,266 s.f. ** + 1,000 rooms + 2,526 units 30,708 s.f. 1,668,826 s.f. 701,413 s.f. 1,270,945 s.f 339 rooms 1,339 rooms 1,490 units 4,001 units 523,118 s.f. 885,000 s.f. 4,419 s.f. 104,018 s.f. 0 0 479 units 495 unit 553,826 s.f. 2,553,826 s.f. 732,692 s.f. 1,374,963 s.f. 339 rooms 1,339 rooms 1,882 units 4,421 units * Includes Bubb Road, Fairgrove,, Oak Valley, other neighborhoods, major employers and other commercial/mixed-use centers, as dened in the 2005 General Plan. Note: Housing Element sites may have dierent densities as noted. Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 30 feet or 45 feet for Housing Element Site at Summer Winds/Graniterock/Jack in the Box Development Allocation Commercial..........125,000 s.f. Oce....................25,000 s.f. Hotel.....................none Residential............275 units South De Anza Special Area Development Allocation Commercial..........20,945 s.f. Oce....................23,826 s.f. Hotel.....................none Residential............101 units Monta Vista Village Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density Up to 15 units per acre Maximum Height 30 feet 100,000 s.f. 200 rooms 200 units Development Allocation Commercial..........250,000 s.f. Oce....................50,000 s.f. Hotel.....................300 rooms Residential............530 units Homestead Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density Up to 35 units per acre Maximum Height 30 feet, or 45 feet (south side between De Anza and Stelling) Development Allocation Commercial..........100,000 s.f. Oce....................90,000 s.f. Hotel.....................300 rooms Residential............825 units North Vallco park Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 60 feet Development Allocation Commercial..........750,000 s.f. Oce....................2,700,000 s.f. Hotel.....................639 rooms Residential............2,100 units Heart of the City Special Area Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 or 35 (South Vallco) units per acre Maximum Height 45 feet Development Allocation Commercial..........25,000 s.f. Oce....................400,000 s.f. Hotel.....................100 rooms Residential............170 units North De Anza Special Area Primary Uses Oce Maximum Residential Density 25 units per acre Maximum Height 75 feet Development Allocation Commercial..........125,000 s.f. Oce....................50,000 s.f. Hotel.....................none Residential............275 units South De Anza Special Area Primary Uses Oce Maximum Residential Density 25 units per acre Maximum Height 30 feet ·········· Citywide Development Summary Existing Alternative A Dierence 17,113 s.f. 390,000 s.f. 695,629 s.f. 680,000 s.f. 339 rooms 600 rooms 1416 units 1620 units 523,118 s.f. 650,231 s.f. 5,784 s.f. 21,413 s.f. 0 0 479 units 275 units 540,231 s.f. 1,040,231 s.f. 701,413 s.f. 701,413 s.f. 339 rooms 600 rooms 1,895 units 1,895 units Citywide Development Allocation Major Corridors Built/Approved Oce Commercial Hotel Residential Other Special Areas* Oce Commercial Hotel Residential Total Oce Commercial Hotel Residential Remaining in Existing GP Alternative C Dierence 8,929,775 s.f. 3,729,569 s.f. 1,090 rooms 21,399 units + 3,272,887 s.f. + 554,371 s.f. + 1,000 rooms + 2,484 units + 227,113 s.f. + 87,895 s.f. 0 + 42 units + 3,500,000 s.f. + 642,266 s.f. + 1,000 rooms + 2,526 units 17,113 s.f. 3,290,000 s.f. 695,629 s.f. 1,250,000 s.f. 339 rooms 1,339 rooms 1,416 units 3,900 units 523,118 s.f. 750,231 s.f. 5,784 s.f. 93,679 s.f. 0 0 479 units 521 units 540,231 s.f. 4,040,231 s.f. 701,413 s.f. 1,343,679 s.f. 339 rooms 1,339 rooms 1,895 units 4,421 units * Includes Bubb Road, Fairgrove, Monta Vista, Oak Valley, other neighborhoods, major employers and other commercial/mixed-use centers, as dened in the 2005 General Plan. ** Net new commercial is not proposed - it is assumed that the existing Vallco Mall square footage (1,267,601 s.f.) will be demolished and that 625,335 s.f. would be reserved for future projects. Note: Housing Element sites may have dierent dnsities as noted. North De Anza Gateway NodeStelling Gateway Node Crossroads Node South Vallco Gateway Node City Center Node North Vallco Gateway Node STEVENS CREEK BLVD DE A N Z A B L V D DE A N Z A B L V D HOMESTEAD RD Stelling Gateway Primary Uses Commercial and Residential Maximum Residential Density East of Stelling -35 units per acre West of Stelling - 15 units per acre Maximum Height East of Stelling - 45 feet West of Stelling - 30 feet Oaks Gateway Primary Uses Commercial and Residential Maximum Residential Density 25 units per acre Maximum Height 45 feet North Crossroads Node Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre; 35 units per acre if Housing Element Site Maximum Height 45 feet or 60 feet with retail City Center Node Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 45 feet South Vallco Park Gateway Primary Uses Commercial, Oce and Residential Maximum Residential Density 35 units per acre Maximum Height 45 feet, or 60 feet with a retail component North Vallco Gateway Primary Uses Commercial and Oce West of Wolfe Maximum Density 25 units per acre Maximum Height 60 feet; or 90 feet when 200 foot depth along Wolfe Road property line for a hotel with major convention center with community benets. East of Wolfe Maximum Density 25 units per acre or 65 units per acre if Housing Element Site Maximum Height 75 feet; Buildings within 50 feet of property lines abutting Wolfe Road, Pruneridge Avenue and Apple Campus 2 site shall not exceed 60 feet. North De Anza Gateway Primary Uses Commercial Maximum Residential Density 35 units per acre Maximum Height 45 feet or 60 feet with retail or 90 feet with a 500 person convention center Oaks Gateway Primary Uses Commercial, Oce and Residential Maximum Residential Density 35 units per acre Maximum Height 45 feet, or 60 feet with a retail component North Crossroads Node Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre; 35 units per acre if Housing Element Site Maximum Height 45 feet, or 60 feet with a retail component City Center Node Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 60 feet, 75 feet with a retail component. = 90 feet with retail and community benets South Vallco Park Gateway Primary Uses Commercial, Oce and Residential Maximum Residential Density 35 units per acre Maximum Height 45 feet, or 60 feet with a retail component North Vallco Gateway Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre (65 units per acre if Housing Element site) Maximum Height West of Wolfe, 60 feet = 90 feet for a 200 foot depth along Wolfe Road property line for a hotel with major convention center with community benets East of Wolfe, 75 feet Buildings with 50 feet of property lines abutting Wolfe Road, Pruneridge Ave. and Apple Campus 2 site shall not exceed 60 feet. North De Anza Gateway Primary Uses Commercial Maximum Residential Density 35 units per acre Maximum Height 60 feet, or 75 feet with a retail component. 95 feet for a hotel with major convention center and community benets Stelling Gateway Primary Uses Commercial and Residential East of Stelling Maximum Residential Density Up to 35 units per acre Maximum Height 45 feet, or 60 feet with a retail component * ** * * * * * * * North Crossroads Node Primary Uses Commercial, Oce and Residential Maximum Residential Density 40 units per acre Maximum Height 60 feet, or 75 with a retail component City Center Node Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 75 feet, or 90 feet with a retail component, = 110 feet with retail and project-wide/ community benets South Vallco Park Gateway East Primary Uses Commercial, Oce and Residential Maximum Residential Density 35 units per acre Maximum Height 75 feet or 90 feet with retail, = 160 feet with retail and project-wide/ community benets North Vallco Gateway Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre (110 units per acre for Hamptons Site) Maximum Height 60 feet, or 75 feet with a retail component (retail not required east of Wolfe Rd), or 85 feet with no retail for the Hamptons = 130 feet along Wolfe Rd with retail and project-wide/community benets North De Anza Gateway Primary Uses Commercial Maximum Residential Density 35 units per acre Maximum Height 60 feet, or 75 feet with a retail component, 145 feet with retail and project-wide/ community benets South Vallco Park Gateway West Primary Uses Commercial, Oce and Residential Maximum Residential Density 35 units per acre Maximum Height 60 feet, or 75 with a retail component, or 85 feet along Stevens Creek Blvd and Wolfe Rd with retail and project-wide/community benets Stelling Gateway Primary Uses Commercial and Residential Maximum Residential Density 35 units per acre Maximum Height 45 feet, or 60 feet with a retail component Oaks Gateway Primary Uses Commercial, Oce and Residential Maximum Residential Density 35 units per acre Maximum Height 60 feet, or 75 feet with a retail component * ** * * * * * * * 08001600 2400 Feet N Legend City Boundary Key Intersections Planning Commission Recommendation revised 10.20.14 Legend City Boundary BRT Stop (for environmental analysis) BRT Line (for environmental analysis) Key Intersections * Additional height allowances w/ retail and project-wide/community benets Balanced Plan revised 6.9.14 Legend City Boundary BRT Stop (for environmental analysis) BRT Line (for environmental analysis) Key Intersections * Additional height allowances w/ retail and project-wide benets Alternative C revised 6.9.14 Primary Uses Oce Maximum Residential Density 25 units per acre Maximum Height 45 feet Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 45 feet 45 feet, 60 feet if there is a retail Homestead Corridor Development Allocation Commercial......... Oce.................... no additional Hotel.................... Residential........... De Anza South Corridor De Anza North Corridor Development Allocation Commercial..........200,000 s.f. Oce....................250,000 s.f Hotel.....................no additional Residential............no additional Primary Uses Oce Maximum Residential Density 25 units per acre Maximum Height 45 feet Wolfe Corridor Primary Uses Commercial, Oce and Residential Maximum Residential Density 35 units per acre Maximum Height 45 feet, 60 feet if there is a retail component Development Allocation Commercial......... 300,000 s.f. Oce....................790,000 s.f. Hotel.....................190,000 s.f. Residential...........no additional Stevens Creek Corridor Development Allocation Commercial......... Oce................... Hotel.................... Residential........... 100,000 s.f. no additional no additional 2,200,000 s.f. Primary Uses Commercial, Medium-High Density Residential, and Public/Quasi-Public Maximum Residential Density 35 units per acre Maximum Height 45 feet, 60 feet if there is a retail component Primary Uses Commercial, Oce and Residential Maximum Residential Density 25 units per acre Maximum Height 45 feet 45 feet, 60 feet if there is a retail Development Allocation Commercial..........200,000 s.f. Oce....................250,000s.f Hotel.....................no additional Residential............no additional Sunnyvale Saratoga Development Allocation Commercial......... Oce................... Hotel.................... Residential........... 996 T DEMAND A Market Study Final Draft | February 13, 2014 Prepared by: bae urban economics 997 GENERAL PLAN AMENDMENT – MARKET STUDY Table of Contents EXECUTIVE SUMMARY................................................................................................1 INTRODUCTION........................................................................................................11 General Plan Amendment Major Mixed-use Corridors....................................................11 Implications for the General Plan Amendment................................................................13 DEMOGRAPHIC TRENDS..........................................................................................14 Population and Household Trends....................................................................................14 Household Composition.....................................................................................................15 Age Distribution..................................................................................................................16 Ethnicity................................................................................................................................17 Household Income Distribution.........................................................................................19 Educational Attainment......................................................................................................19 Schools.................................................................................................................................20 Resident Occupation and Employment............................................................................21 Commute Flow....................................................................................................................22 Implications for General Plan Amendment.......................................................................23 EMPLOYMENT TRENDS............................................................................................24 Major Employers.................................................................................................................24 Jobs by Occupation and Industry......................................................................................25 Worker Age Distribution.....................................................................................................27 Worker Income....................................................................................................................28 Worker Ethnicity..................................................................................................................29 Implications for General Plan Amendment.......................................................................29 RETAIL SALES AND LEAKAGE ANALYSIS................................................................31 Estimated Retail Sales in Cupertino and the RTA by Major Retail Category.................33 Trends in Retail Sales..........................................................................................................36 Leakage Analysis.................................................................................................................40 REAL ESTATE MARKET TRENDS...............................................................................54 Residential Market...............................................................................................................54 998 GENERAL PLAN AMENDMENT – MARKET STUDY Office Real Estate Market Overview..................................................................................62 Retail Real Estate Market Overview...................................................................................69 Hotel Market Overview.......................................................................................................73 POTENTIAL MARKET SUPPORT FOR NEW DEVELOPMENT...................................78 Population, Household and Employment Projections.....................................................78 Housing Demand................................................................................................................79 Office Demand....................................................................................................................81 Retail Demand.....................................................................................................................85 Hotel Demand.....................................................................................................................90 Summary of Demand Estimates.........................................................................................92 APPENDIX A: ZIP CODES IN THE RETAIL TRADE AREA..........................................93 APPENDIX B: RETAIL SALES TRENDS.......................................................................94 APPENDIX C: LEAKAGE ANALYSIS DETAIL...........................................................101 APPENDIX D: NOTES ON METHODOLOGY FOR RETAIL SALES AND LEAKAGE ESTIMATES..............................................................................................................103 APPENDIX E: WORKER SPENDING CLOSE TO PLACE OF WORK........................104 APPENDIX F: NET RETAIL EXPENDITURES NEAR WORK FOR CUPERTINO WORKERS................................................................................................................106 APPENDIX G: CURRENTLY LEASING PROPERTIES................................................107 APPENDIX H: PLANNED AND PROPOSED DEVELOPMENT IN CUPERTINO.......114 999 GENERAL PLAN AMENDMENT – MARKET STUDY Table of Tables Table 1: Population and Household Trends, 2000-2010.....................................................15 Table 2: Household Composition, 2000-2010 ......................................................................16 Table 3: Ethnicity, 2000-2010.................................................................................................18 Table 4: Household Income (a)..............................................................................................19 Table 5: Educational Attainment for Population 25+ Year of Age (a)................................20 Table 6: Employed Residents by Occupation and Industry (a)...........................................22 Table 7: Commute Flow (a)....................................................................................................23 Table 8: Principal Employers in Cupertino, 2012.................................................................25 Table 9: Occupation and Industry by Workplace Location (a)............................................26 Table 10: Employee Age Distribution (a)..............................................................................27 Table 11: Worker Earnings in the Past 12 Months (a)..........................................................28 Table 12: Worker Race and Ethnicity (a)...............................................................................29 Table 13: Total Estimated 2011 Retail Sales.........................................................................35 Table 14: Summary of Leakage Analysis...............................................................................42 Table 15: Detail on Motor Vehicle Sector Sales...................................................................49 Table 16: Detail on Furniture and Home Furnishings Store Sales......................................49 Table 17: Detail on Electronics and Appliances Store Sales...............................................49 Table 18: Detail on Building Materials Sector Sales............................................................50 Table 19: Detail on Food and Beverage Store Sales...........................................................50 Table 20: Detail on Health and Personal Care Store Sales.................................................51 Table 21: Detail on Clothing and Clothing Accessory Store Sales.....................................51 Table 22: Detail on Sporting Goods, Hobby, Book, and Music Store Sales......................52 Table 23: Detail on General Merchandise Store Sales........................................................52 Table 24: Detail on Miscellaneous Retail Store Sales..........................................................52 Table 25: Detail on Food Services and Drinking Places Sales............................................53 Table 26: Housing Units by Type of Structure (a).................................................................55 1000 GENERAL PLAN AMENDMENT – MARKET STUDY Table 27: Household Tenure, 2000-2010..............................................................................56 Table 28: Sale Price Distribution of Single-Family Residences and Condominiums by Number of Bedrooms, March-August 2013 (a)....................................................................59 Table 30: Population, Household, and Employment Projections, 2010 & 2040................79 Table 31: Projected Housing Unit Growth, West Valley, 2010-2040...................................79 Table 32: Projected Housing Unit Demand, Cupertino, 2020-2035...................................80 Table 33: Annual Office Space Demand Based on Projected Employment, West Valley, 2010-2040................................................................................................................................82 Table 34: Corporate Campuses Recently Proposed by Silicon Valley Tech Companies..83 Table 35: Projected Office Demand, Cupertino, 2013-2035...............................................84 Table 36: Support from Existing Residents and Workers for Additional Retail Space in Cupertino................................................................................................................................85 Table 37: Support from Growth in Population and Employment for Additional Retail Space in Cupertino............................................................................................................................88 Table 38: Projected Lodging Demand, Cupertino..............................................................91 Table A-1: Zip Codes in the Retail Trade Area....................................................................93 Table B-1a: Cupertino Taxable Retail Sales Trends, 2000-2008.........................................95 Table B-1b: Cupertino Taxable Retail Sales Trends, 2009-2012.........................................96 Table B-2a: Santa Clara County Taxable Retail Sales Trends, 2000-2008..........................97 Table B-2b: Santa Clara County Taxable Retail Sales Trends, 2009-2011..........................98 Table B-3a: California Taxable Retail Sales Trends, 2000-2008..........................................99 Table B-3b: California Taxable Retail Sales Trends, 2009-2011........................................100 Table C-1: Leakage Analysis Detail.....................................................................................102 Table E-1: Worker Spending Close to Place of Work........................................................105 Table F-1: Net Retail Expenditures Near Work for Cupertino Workers...........................106 Table G-1: Currently Leasing Office Properties, Cupertino, June 2013...........................108 Table G-2: Currently Leasing Retail Properties, Cupertino, June 2013............................111 Table H-1: Planned and Proposed Development, Cupertino, May 2013.........................115 1001 GENERAL PLAN AMENDMENT – MARKET STUDY Table of Figures Figure 1: General Plan Amendment Study Areas...............................................................12 Figure 2: Age Distribution, 2010...........................................................................................17 Figure 3: Cupertino and the Retail Trade Area....................................................................31 Figure 4: California Taxable Retail Sales Trends, 2000-2011...............................................37 Figure 5: Santa Clara County Taxable Retail Sales Trends, 2000-2011..............................38 Figure 6: Cupertino Taxable Retail Sales Trends, 2000-2012..............................................39 Figure 7: Cupertino Retail Sales Leakages by Major Retail Store Category......................45 Figure 8: RTA Retail Sales Leakages by Major Retail Store Category................................47 Figure 9: Residential Units Permitted, 2003-2012................................................................56 Figure 10: Residential Units Permitted by Building Type, 2003-2012.................................57 Figure 11: Median Home Sale Price, 2005-2012..................................................................58 Figure 12: Rental Stock by Number of Bedrooms, Second Quarter 2013 (a)....................60 Figure 13: Rental Rate Trends, 2005-2013 ............................................................................61 Figure 14: Vacancy Rate Trends, 2005-2013.........................................................................61 Figure 15: Office Inventory, 2003-2013.................................................................................64 Figure 16: Annual Net Office Absorption, Cupertino, 2003-2012......................................65 Figure 17: Annual Net Office Absorption, West Valley, 2003-2012....................................66 Figure 18: Class A Office Lease Rates, First Quarter 2003 to First Quarter 2013..............67 Figure 19: Office Vacancy Rates, First Quarter 2003 to First Quarter 2013........................67 Figure 20: Retail Inventory, 2006-2013 (Year to Date) (a).....................................................70 Figure 21: Net Annual Retail Absorption, Cupertino, 2006-2013.......................................71 Figure 22: Net Annual Retail Absorption, Santa Clara County, 2006-2013........................71 Figure 23: Retail Lease Rate Trends, 2006-2013...................................................................72 Figure 24: Retail Vacancy Trends, 2006-2013 .......................................................................73 Figure 25: Hotel Inventory, Cupertino, 2013 ........................................................................75 Figure 26: Occupancy by Day of Week, August 2012-July 2013 .........................................76 Figure 27: Hotel Average Daily Rate and Occupancy Rate, 2007-2012..............................77 1002 GENERAL PLAN AMENDMENT – MARKET STUDY 1 EXECUTIVE SUMMARY Study Areas – Location and Description The Cupertino General Plan Amendment (GPA) focuses on five corridors along Stevens Creek Boulevard (Heart of the City Corridor), De Anza Boulevard (South De Anza and North De Anza Corridor), Wolfe Road (North Wolfe Corridor), and Homestead Road (Homestead Corridor). Each corridor is located east of Highway 85 in neighborhoods with existing commercial or office development.  Most of the parcels within the five corridors are developed with existing uses, and as a result, new development facilitated by the GPA would consist largely of either redevelopment of existing buildings, selective demolition of existing structures and replacement with new construction, or new infill development adjacent to existing uses.  Overall, these corridors will be attractive opportunities for residential and commercial renovation and new construction. Demographic Trends With a 2010 population of approximately 58,3001, Cupertino is a growing community with a significant concentration of highly educated and high-income households attracted to the city by its outstanding public schools and location in the heart of Silicon Valley. The city’s household composition is weighted towards family households with children, with a lower percent of households comprised of singles. As the city has grown, its ethnic mix has changed to where its Asian population comprises approximately 63.1 percent of the population in 2010.  Cupertino has experienced modest growth, averaging 1.4 percent annually over the past ten years. This is a more rapid growth rate than either Santa Clara County or the Bay Area as a whole.  The city’s average household size in 2010 was 2.87, about the same as Santa Clara County (2.90 persons per household) and higher than the Bay Area average (2.69 persons per household).  The larger average household size is driven by the higher percentage of households with children under the age of 18. In Cupertino, 47.3 percent of households have 1 This study uses 2010 as the base year for comparisons and consistency with forecasts prepared by the Association of Bay Area Governments; the 2012 U.S. Census population estimate for Cupertino is approximately 60,000. 1003 GENERAL PLAN AMENDMENT – MARKET STUDY 2 children under the age of 18, compared to 38.4 percent of households in Santa Clara County and only 33.4 percent of households in the Bay Area. Only 17.6 percent of Cupertino households in 2010 were comprised of single adults compared to 21.8 percent for Santa Clara County and 26.1 percent for the Bay Area.  Between 2000 and 2010, the ethnic composition of Cupertino’s population has changed significantly. The proportion of residents who are of Asian descent grew from 44.3 percent to 63.1 percent of the city’s population, while the percent of non- Hispanic white residents fell from 47.8 to 29.3 percent. The percent of population in other ethnic categories such as African-American, Hispanic, and 2+ Races generally remained stable.  Cupertino residents have high levels of educational attainment. Over 73 percent of city residents over the age of 18 have a bachelor, graduate, or professional degree compared to 46 percent in Santa Clara County, and 42 percent in the Bay Area.  Cupertino residents’ high level of educational attainment is correlated with a high degree of professional occupations: 77 percent of employed city residents work in management, business, science, or arts occupations, compared to 45 percent of Bay Area residents.  Reflecting high education levels and professional occupations, Cupertino households earn a significantly higher median household income ($123,700) than Santa Clara County ($87,200), and the Bay Area ($75,800). This means Cupertino households can support higher rents and home prices as well as higher levels of discretionary retail spending.  Cupertino’s public schools are among the best in California, attracting families with children to the city. All of the elementary and middle schools in the city achieved the minimum California Academic Performance Index standard of 800 in 2012, and 22 of Cupertino’s elementary and middle schools achieved over 900. All but one of the high schools that serve the city also exceeded the minimum standard of 800 in 2012. Enrollments have risen in Cupertino’s public schools even through new housing development has been limited in recent years.  Overall, Cupertino’s strong demographics provide strong support for renovated or new retail shopping facilities in the city. Economic Trends As the home of Apple Inc., Cupertino is dominated by the technology sector. The city experiences a net daily inflow of approximately 26,700 workers to employment centers. Cupertino’s strong economy supports demand for both office space and retail facilities.  As the city’s largest employer with over 13,000 employees, Apple Inc. impacts the demand for office space in Cupertino through its own internal growth and 1004 GENERAL PLAN AMENDMENT – MARKET STUDY 3 acquisitions, attraction of firms doing business with Apple, and through spin-offs and start-ups established by Apple Inc. employees.  While there are approximately 31,800 jobs in Cupertino, there are approximately 5,100 residents in the city who also work in Cupertino, indicating a net inflow of approximately 26,700 workers into the community on weekdays. These workers represent a segment of market demand for convenience retail expenditures.  61 percent of jobs in Cupertino are in occupations related to management, business, science, and the arts, while approximately 20 percent of jobs in the city are in sales and office occupations. Together, these two occupational categories account for over 80 percent of jobs in Cupertino.  While Cupertino employment data shows that just under 29 percent of its jobs are classified as being in the manufacturing sector, only four percent of occupations are actually in production, transportation and material moving occupations. This reflects Apple Inc. as a computer and mobile device manufacturing company with headquarters and R&D activities in Cupertino, but with manufacturing activity located outside the community.  As a result of the higher percentage of management, business, science, and arts occupations, the median earnings of workers in Cupertino is $81,000, approximately 42 percent higher than the median earnings for workers overall in Santa Clara County ($57,000).  Cupertino’s work force is composed of a lower proportion of younger workers when compared to Santa Clara County. Just 28 percent of Cupertino’s jobs are held by workers under age 35, compared to 32 percent of all jobs in the county.  The ethnic profile of workers in Cupertino is different than the profile for the resident population. While the resident population in the city is over 63 percent of Asian ethnicities, just fewer than 35 percent of workers are of Asian ethnicities. Compared to the city’s residential population, a larger percent of workers are of non-Hispanic white and Hispanic or Latino race and ethnicity. This suggests that retail in Cupertino must cater to a more diverse base of customers than reflected by the city resident profile alone.  Overall, Cupertino has a highly compensated workforce that provides a strong base of potential retail sales during the workday, although this is somewhat tempered by onsite food service and other amenities offered by major employers such as Apple Inc. 1005 GENERAL PLAN AMENDMENT – MARKET STUDY 4 Residential Market Assessment Cupertino has a strong residential market due largely to the high quality of the local school districts and the presence of Apple Inc. and other high-tech employers. Strong demand for homes in Cupertino has created a housing market characterized by high home prices and rental rates, which were impacted relatively little during the Great Recession. While demand is strong, new construction has been modest in the current economic recovery.  Cupertino’s residential market is primarily comprised of single-family attached and detached homes, which together account for nearly 70 percent of the city’s housing stock. The proportion of homeowners in Cupertino is approximately 63 percent, reflecting the predominance of single-family homes in the community which tend to be purchased by owner-occupants.  Cupertino’s median home price at the end of 2012 was approximately $1,045,800, almost double the median home price of $525,000 reported for Santa Clara County. During the Great Recession, the median home price in Cupertino fell by only eight percent from peak to trough, compared to a 35 percent price decline countywide.  A breakdown of data for home sales by type of unit and size indicates that most of Cupertino’s units selling for less than the reported median are condominiums. These units sold for a median price of $775,000 at the end of 2012, compared to single-family home sales with a median price of $1.4 million. Two-thirds of condominiums sales were for two bedroom units, in contrast to over 50 fifty percent of single family home sales for units with four or more bedrooms.  Thirty percent of Cupertino’s housing stock is in multifamily units. An analysis of rental residential properties indicates that the city’s rental stock has a higher proportion of larger rental units (59 percent of units had two or more bedrooms) than found elsewhere in Santa Clara County (49 percent of total units with two or more bedrooms), likely reflecting demand for rentals oriented to families attracted by local schools.  The city’s rental apartment complexes are experiencing strong occupancy and rising rental rates. Although occupancy rates fell during the Great Recession to 93 percent, occupancy had recovered to almost 95 percent by the end of the second quarter of 2013. Market analysts consider 95 percent occupancy rates to indicate a balanced market between demand and supply.  Rental rates in Cupertino now exceed rental rates achieved prior to the recession. As of the end of the second quarter 2013, the average apartment in Cupertino was $2,426 –17 percent higher than the average apartment rental rate for Santa Clara County ($2,062).  While residential construction in Santa Clara County is approaching pre-recession levels, residential construction in Cupertino has improved only slightly from its 1006 GENERAL PLAN AMENDMENT – MARKET STUDY 5 trough year 2009, despite strong demand signals such as rising home prices and apartment rents.  As of the date of this report, there was only two planned or proposed for-sale residential projects, Parkside Trails (18 units) on Stevens Creek Road and a six-unit live/work project on Foothill Boulevard and Silver Oak Way. Cupertino also has three rental residential projects in the development pipeline, which will add a total of 404 units to the housing supply.  Overall, there is strong demand for both for-sale and rental housing, and a potential gap in the market for units targeted to young or single households or other smaller households. This mismatch is suggested by the profile of workers commuting into Cupertino, with lower median ages than residents. Retail Market Assessment While Cupertino has one regional mall and several community retail shopping centers and clusters, the city is experiencing significant retail sales leakage overall. As noted in the separate Retail Strategy Report, there are barriers to entry for new retail in the City due to lack of suitable sites. While there are planned projects that may allow the city to recapture a portion of these lost sales opportunities, the City’s biggest opportunity to improve its retail sector lies with successfully redeveloping the existing Vallco Shopping Center.  Total retail sales for Cupertino in 2011 were estimated at approximately $615 million. The three largest categories by sales volume are food and beverage stores (27 percent), food services and drinking places (22 percent), and general merchandise stores (20 percent). Taxable retail sales have risen over the past three years reflecting both a recovery from the Great Recession as well as population growth.  When measured on a per capita basis, total retail sales in Cupertino are relatively low, at $10,483 annually per resident, compared to $15,807 annually for the Retail Trade Area and $13,404 for Santa Clara County. This results in sales leakage outside of Cupertino, meaning residents and workers are spending retail dollars at stores in other jurisdictions nearby.  Much of this leakage from Cupertino is attributable to a strong surrounding Regional Trade Area, with ample shopping centers and retail facilities serving the larger South Bay. When analyzed overall, the Regional Trade Area is well-balanced between potential demand from residents and workers, and sales occurring within it; analysis indicated less than eight percent of potential sales from Trade Area customers were occurring outside of the Trade Area.  Cupertino’s retail leakage to the Retail Trade Area does not stem from any fundamental flaw in its location, transportation access, or demographics, but rather 1007 GENERAL PLAN AMENDMENT – MARKET STUDY 6 from other retail development being better executed and operated outside the City (see Retail Strategy Report for further information see the Retail Strategy Study).  Cupertino has relatively strong retail sales in stores selling everyday items, such as food stores and drug stores.  General merchandise stores that sell a mix of everyday items and comparison goods are performing well due to the presence of three mall department stores and one discount department store in Cupertino.  Stores specializing in other types of comparison goods, however, are lacking in the city. With the exception of the Vallco Shopping Mall, most of Cupertino’s retail stores serve convenience-oriented shopping.  None of the existing shopping centers in Cupertino can be categorized as a “lifestyle” center” although Cupertino Village, The Oaks, and Vallco Shopping Center have elements of “lifestyle” retail This newer type of retail, which combines upscale, specialty retail, dining, and entertainment in one shopping experience, has recently been developed elsewhere in the Bay Area, exemplified by Santana Row. The Main Street project planned for Cupertino will add this type of experience to the city’s retail inventory. Despite exceptionally strong household demographics and worker incomes, as well as significant retail leakage, the market has only recently responded with new retail projects in Cupertino.  Terranomics, Inc., a regional commercial brokerage firm specializing in retail, indicates that the Cupertino/Sunnyvale submarket has an inventory of 4.2 million square feet of retail as of the end of the second quarter 2013. The submarket’s inventory has expanded modestly by nearly five percent over the past seven years.  The Cupertino/Sunnyvale submarket has averaged approximately 27,200 square feet of net retail absorption annually over the past ten years. The market experienced negative net absorption service in 2010, reflecting the impact of the Great Recession as well as in 2012 when some retail space was unoccupied due to renovation or replacement project plans occurring both in Cupertino and Sunnyvale.  A review of retail spaces currently for lease in Cupertino indicates an asking and actual rental range between $2.25 and $4.50 monthly per square foot triple net – a level high enough to make new retail construction potentially financially feasible.  There are eight projects with a retail component that are under construction, approved, or planned in Cupertino. These projects together will bring a total of approximately 352,600 net new square feet of retail to the city. 1008 GENERAL PLAN AMENDMENT – MARKET STUDY 7 Overall, there is potentially strong market support for renovated or new retail facilities – given that existing and new centers deliver the right retail mix in a contemporary setting that provides a great experience to shoppers. Cupertino enjoys two advantages to support new retail development:  Centrally located within the Retail Trade Area  Excellent access to freeways, expressways, and major arterials A detailed analysis of Cupertino’s retail sales data indicates a number of retail categories that could be targeted for both planned and proposed projects as well as future retail development under the General Plan Amendment. Categories with significant potential (defined here as categories in which per capital sales in Cupertino are less than half the per capita sales for Santa Clara County) include:  Vehicle and parts dealers (except for tire dealers)  Radio, television, and other electronics stores,  Computer and software stores  Home centers, paint and wallpaper stores, hardware stores, and other building material dealers  Meat markets and specialty food stores  Cosmetics, beauty supplies, and perfume stores  Men’s and woman’s clothing stores, children’s and infant’s clothing stores  Family clothing stores  Clothing accessory stores  Luggage and leather goods stores  Bookstores, news dealers and newsstands  Prerecorded tape, compact disc, and record stores  Warehouse clubs and supercenters  Miscellaneous retail stores (except pet and pet supplies stores and tobacco stores)  Food service contractors and drinking places (alcoholic beverages) The degree to which Cupertino can increase sales in these above-mentioned categories will depend on the specific location and site characteristics and location of new retail development and general competitive forces (such as location of competitors). See the Retail Strategy Study for more information on this topic. As indicated in the Retail Strategy Report, the Vallco Shopping Center represents a mixed picture for Cupertino. Its anchor department stores and entertainment options appear to draw shoppers to the city, but the poor performance of the remainder of the mall contributes to the city’s overall leakage of sales to other competing communities.  To expand retail offerings at Vallco and to improve the overall experience of shopping at this center, property owners need incentives to invest in or redevelop their properties. 1009 GENERAL PLAN AMENDMENT – MARKET STUDY 8  Increasing density at Vallco to permit mixed-uses would be a powerful incentive to motivate Vallco property owners to improve and/or redevelop the shopping center. Office Market Assessment The office market in Cupertino has been performing strongly, led by the growth of Apple Inc., and other technology companies. By several metrics, demand continues to be strong, limited primarily by supply constraints. To continue to be attractive to technology companies, the city must encourage the renovation or replacement of existing office facilities with newer, more functional, environmentally sustainable space with a high level of on-site amenities as well as strong linkages to nearby retail and recreational amenities.  Cupertino’s inventory of office space consists of 4.1 million square feet located primarily along Stevens Creek Boulevard, De Anza, and North Wolfe Road. Cupertino accounts for 6.7 percent of Santa Clara County’s 61 million square foot office market.  Measured by vacancy rates, the Cupertino office market has exhibited consistently lower vacancy rates than for either Santa Clara County or the West Valley office submarket. As of the end of the first quarter 2013, the city’s office vacancy rate was only 1.5 percent compared to 11.7 percent in the West Valley and 13.0 percent county wide.  The city’s low office vacancy rate is the result of four years of positive net absorption and little new office construction. Over the past ten years the average annual net absorption of office space has been approximately 60,500 square feet.  Office landlords have been able to achieve consistently higher rental rates in Cupertino than in the West Valley submarket and County overall. At the end of the first quarter 2013, the average full service monthly asking rental rate for Class A office space was $3.94 per square foot on a full service basis in Cupertino, compared to $3.56 per square foot in the West Valley and $3.49 per square foot countywide. Commercial brokers report that large blocks of office space are generally not available and high office rents discourage some businesses from locating in the Cupertino.  Cupertino City Center, considered the city’s premier office building, has been 100 percent occupied for over a year and only now has 8,200 square feet available. Similarly, the Cupertino Financial Center reports only 1,000 square feet available as of the date of this report.  There are four planned and proposed office development projects in Cupertino that could add up to one million square feet of additional supply to the city’s inventory. However, three-quarters of this inventory expansion is for Apple Inc., and 1010 GENERAL PLAN AMENDMENT – MARKET STUDY 9 approximately 294,000 square feet of additional office is planned in three other projects and could be offered to other firms and businesses. Hotel Market Assessment Business-related travel is the driver of demand for hotel rooms in Silicon Valley. Exceptionally strong occupancy and growth in room revenue in Cupertino’s existing hotels suggest support for additional hotel rooms. General population and employment growth will also increase overall total demand. Hotels are one of the riskiest real estate investments and financing can be difficult to obtain. As a result development of new hotels tends to lag job growth. Cupertino has an advantage over other West Valley communities by having Apple Inc., as its main employer and generator of business travel.  Cupertino has an inventory of 785 rooms in five hotel properties: Cupertino Inn, Courtyard by Marriott, Hilton Garden Inn, Kimpton Cypress Hotel and Aloft Cupertino.  Hotel operators indicate that between 70 and 75 percent of hotel room demand is business related.  After declining during the Great Recession, hotel occupancy in Cupertino is now higher than before the recession – averaging 80 percent occupancy during 2012. Some operators report current occupancy rates as high as 90 or 100 percent during weekdays. Most hotel market analysts consider 70 percent occupancy as an overall financially feasible level; thus, Cupertino’s rates are relatively high, suggesting strong market demand and room for growth in supply.  The average daily room rate for Cupertino hotel properties, at $134.30 in 2012, is approaching pre-recession levels.  The city’s hotel development pipeline totals 302 rooms in two projects located at the Oaks Shopping Center and within the Main Street project, respectively.  Overall, market indicators, including the expansion of Apple Inc., signal support for new hotel development in Cupertino. Summary of Demand Estimates Based on the above analysis, the following table summarizes the market demand findings of this report. These findings will be considered during the planning process and inform the setting of new allocations for the City of Cupertino.  Housing. Demand estimates range from indicate market support for an increased allocation of between 473 and 1,939 units by 2020 and between 2,353 and 4,420 units by 2035. 1011 GENERAL PLAN AMENDMENT – MARKET STUDY 10  Office. Demand estimates are 2.9 million square feet through 2020 and 3.6 million square feet by 2035. These estimates incorporate the Apple 2 campus and would accommodate demand from a large corporate user (either new or an existing firm expanding in the future).  Retail. The range of supportable square footage of new retail space resulting from capture of current sales leakages of existing resident and worker expenditures and future demand from new residents and workers is estimated to be between 51,800 and 222,000 by 2020 and from 158,000 to 345,000 square feet by 2035. This level of demand indicates that the current remaining commercial allocation of 701,500 square feet is generally adequate. While a portion of this demand could be met with renovated or redeveloped retail in all four corridors, the primary opportunity to capture this retail demand as well as increase the city’s share of retail sales within the Retail Trade Area would lie with the Vallco Shopping Center. The Retail Strategy Report presents a detailed analysis of the Vallco district.  Hotel. No or little new hotel demand is identified between now and 2020, but new demand for hotel rooms may range from 40 to 985 room by 2035. Summary of Demand Estimates Office LowHighLowHighLowHigh Through 2020 Demand Through 2020 (Units/Sq.Ft.)8771,535303,061227,800 398,000 61202 Demand Adjustments (a)- - 2,750,000 - - - - Less: Entitled Projects (404)(404)147,050176,000 176,000 (151)(151) Net Demand 4731,9392,906,01151,800 222,000(90)51 Through 2035 Demand Through 2035 (Units/Sq.Ft.)2,7574,824952,477 334,000521,000 191636 Demand Adjustments - - 2,750,000(a)- - - 500 (b) Less: Entitled Projects 404404147,050176,000176,000(151)(151) Net Demand 2,3534,4203,555,428158,000345,00040985 Notes: (a) For Office Apple Campus 2 and 1.5 million sq.ft. added; see text for description. (b) Adjustment for flexibility in meeting long-term demand under high scenario; see text for description. Sources: City of Cupertino; BAE 2013. Residential HotelRetail 1012 GENERAL PLAN AMENDMENT – MARKET STUDY 11 INTRODUCTION Located in the heart of the Silicon Valley with a 2010 population of approximately 58,3002, Cupertino has emerged over the past two decades as one of the major economic nodes in the increasingly interconnected global economy. The city is home to one of the world’s most valuable companies and brands (Apple, Inc.), has a thriving small business sector, and is one of the most highly educated communities in the nation. In early 2013, the City of Cupertino initiated a process to review several properties in the commercial districts in Cupertino, including the Vallco Shopping Mall, as part of a focused General Plan Amendment (GPA). This process includes an extensive community discussion on mobility, urban design and economic development challenges and ideas. As a starting point for the GPA process, the City will be evaluating potential increases to citywide development allocations for office, commercial, housing and hotel uses. This Market Demand Analysis provides background information on demographic and employment trends in Cupertino, Santa Clara County and the greater Bay Area, and assesses market trends and demand for new residential, retail and office development in Cupertino. The information and analysis provided in this analysis will inform the development of Concept Alternatives that will form the basis for the General Plan Amendment. General Plan Amendment Major Mixed-use Corridors The GPA will focus on identifying land use, economic development, and urban design changes on five corridors, shown in Figure 1 below. These major mixed-use corridors represent key “change areas” within Cupertino where future development will be focused. Most of these areas are developed with existing uses, and as a result, new development facilitated by the GPA would consist largely of either redevelopment of existing buildings, selective demolition of existing structures and replacement with new construction, or new infill development adjacent to existing uses. 2 This study uses 2010 as the base year for comparisons and consistency with forecasts prepared by the Association of Bay Area Governments; the 2012 U.S. Census population estimate for Cupertino is approximately 60,000. 1013 GENERAL PLAN AMENDMENT – MARKET STUDY 12 Figure 1: General Plan Amendment Major Mixed-Use Corridors Source: City of Cupertino and MIG, 2014 A. Homestead Corridor (red) This corridor includes the area surrounding Homestead Road between Stelling and Blaney Avenue, within the Cupertino city limits. This corridor runs along the city’s northern border and includes commercial uses, a PG&E facility, and several low, medium, and high density residential neighborhoods. B. North Wolfe Corridor (blue) This corridor is a major north/south connector that includes the Apple Campus 2, hotels, office, and other commercial uses. C. Heart of the City Corridor (green) This corridor is the ‘‘heart’’ of Cupertino and includes many of the city’s largest commercial, office, mixed-use, and residential areas located along Stevens Creek Boulevard. It also includes the entire Vallco Shopping District site. This corridor has the same boundary as the current Heart of the City Specific Plan. D. North De Anza Corridor (purple) This corridor is a major north/south connector that includes many office and commercial uses. 1014 GENERAL PLAN AMENDMENT – MARKET STUDY 13 E. South De Anza Corridor (yellow) This corridor a north/south connector that includes smaller-scale commercial, office and residential uses Implications for the General Plan Amendment All of the major mixed-use corridors are comprised of high traffic arterials, with many sites having visibility of quick access to I-280, making sites within the corridors highly desirable for residential and commercial redevelopment and/or new construction. 1015 GENERAL PLAN AMENDMENT – MARKET STUDY 14 DEMOGRAPHIC TRENDS The following sections detail demographic characteristics and trends in Cupertino, including how the city has changed and grown in recent years, which will inform the real estate market demand analysis presented in later sections of this report. Demographic data were compiled from the U.S. Census Decennial Census and American Community Survey (ACS). The ACS publishes estimates of demographic conditions for geographies the size of Cupertino based on statistical sampling conducted continuously over a three-year period.3 While these data cannot represent conditions at a specific point in time, as in the previous decennial censuses, they are updated on an annual basis and offer a valuable means to compare characteristics across geographies. Estimated future changes in population, households, and employment were based on projections provided by the Association of Bay Area Governments (ABAG). To the extent that data are available, information is presented for Cupertino along with comparative information for Santa Clara County and the nine-county Bay Area.4 The base year of the demographic analysis is 2010 to facilitate comparisons and for consistency with ABAG forecasts. Population and Household Trends As shown in Table 1, Cupertino had a population of 58,302 residents and 20,181 households in 2010. These figures represent a 15 percent increase in population and an 11 percent increase in households since 2000, significantly higher than the rate of growth in Santa Clara County (six percent increase in population; seven percent increase in households) and the Bay Area (five percent increase in population; six percent increase in households). Between 2000 and 2010, the rate of population and household growth in Cupertino surpassed the growth rate in surrounding areas. Table 1 summarizes population and household trends for Cupertino, Santa Clara County, and the Bay Area. 3This data source replaces the information obtained in previous Censuses from the “long form” questionnaire. For more information on the ACS, see www.census.gov/acs/www/about_the_survey/american_community_survey/ 4 The nine-county Bay Area consists of the Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, and Sonoma Counties. 1016 GENERAL PLAN AMENDMENT – MARKET STUDY 15 Table 1: Population and Household Trends, 2000-2010 Annual % Change Cupertino 2000 20102000-2010 Population 50,54658,3021.4% Households 18,20420,1811.0% Santa Clara County Population 1,682,5851,781,6420.6% Households 565,863604,2040.7% Bay Area (a) Population 6,783,7607,150,7390.5% Households 2,466,0192,608,0230.6% Notes: (a) The nine-county Bay Area includes Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, and Sonoma counties. Sources: U.S. Census 2000 & 2010; BAE, 2013. Household Composition Households in Cupertino tend to be slightly larger than average for the Bay Area and about the same size as Santa Clara County. In 2010, the average household size was approximately 2.9 persons in Cupertino and Santa Clara County and 2.7 persons in the Bay Area overall, as shown in Table 2. Moreover, Cupertino has a larger proportion of family households and households with children than Santa Clara County and the Bay Area. Family households accounted for more than three quarters of all Cupertino households (78 percent) in 2010, compared to 71 percent of households in Santa Clara County and 65 percent of households in the Bay Area. Close to half of all households in Cupertino (47 percent) included children under the age of 18, compared to approximately one third in Santa Clara County (38 percent) and the Bay Area (33 percent). The large and growing number of households with children in Cupertino is due largely to the school districts that serve the city, which are among the most highly rated in the country. Household characteristics suggest recent demographic shifts in Cupertino, leading to larger household sizes, more families, and more households with children. The average household size in Cupertino increased from 2.75 persons in 2000 to 2.87 persons in 2010, while the average household size was essentially unchanged in both Santa Clara County and Bay Area. The proportion of family households and households with children also increased between 2000 and 2010 in Cupertino while changing only slightly in Santa Clara County and the Bay Area. 1017 GENERAL PLAN AMENDMENT – MARKET STUDY 16 Table 2: Household Composition, 2000-2010 Santa Clara CupertinoCountyBay Area (a) 200020102000201020002010 Average Household Size 2.752.872.922.902.692.69 Household Type (b) Non-Family Single Person 19.6%17.6%21.4%21.8%25.9%26.1% 2+ Persons 5.6%4.3%8.7%7.6%9.5%9.2% Non-Family Households25.2%21.8%30.1%29.4%35.3%35.4% Family Households 74.8%78.2%69.9%70.6%64.7%64.6% Households with Children < 1843.2%47.3%38.6%38.4%34.7%33.4% Notes: (a) The nine-county Bay Area includes Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, and Sonoma counties. (b) A family is a group of two people or more related by birth, marriage, or adoption and residing together. Sources: U.S. Census 2000 & 2010; BAE, 2013. Age Distribution Census data indicate that Cupertino residents have a slightly higher median age than residents in the region and the city has a significantly different distribution of age cohorts. In 2010, the median age in Cupertino was 39.9, compared to 36.2 in Santa Clara County, and 37.7 in the Bay Area. Looking at the age cohorts, as shown in Figure 2, Cupertino has a high proportion of children under 18 (28 percent of the population in 2010, compared to 24 percent in the county and 22 percent in the region) and adults in the 35 to 64 years-of-age cohort (46 percent of the population in 2010, compared to 41 percent in the county and 42 percent in the region). Conversely, the city has a lower proportion of adults in the 18 to 34 years-of-age cohort, which accounted for only 14 percent of the population in Cupertino and 24 percent of the population of the county and region. These data demonstrate that Cupertino is primarily populated by families with children and that young adults do not comprise a large portion of the population. 1018 GENERAL PLAN AMENDMENT – MARKET STUDY 17 Figure 2: Age Distribution, 2010 Notes: (a) The nine-county Bay Area includes Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, and Sonoma counties. Sources: U.S. Census 2000 & 2010; BAE, 2013. 14%24%24% 46% 41%42% 12%11%12% 28%24%22% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% CupertinoSanta Clara CountyBay Area (a) 65 or older 35-64 18-34 Under 18 Ethnicity Cupertino differs markedly from the county and region with respect to the racial and ethnic breakdown of the population. In 2010, approximately two thirds of the population of Cupertino was of Asian descent, while approximately one third of the population of Santa Clara County and one quarter of the population of the Bay Area consisted of individuals of Asian descent. In all three geographies, data from 2010 demonstrate a significant increase in the Asian population compared to 2000; however, the difference is especially notable in Cupertino, where the Asian population grew by 64 percent between 2000 and 2010. Compared to the county and region, Cupertino had a smaller share of individuals from all other racial and ethnic groups in 2010. The city’s share of individuals of Hispanic origin (four percent of the population) is particularly small relative to Santa Clara County (27 percent of the population) and the region (24 percent of the population). 1019 GENERAL PLAN AMENDMENT – MARKET STUDY 18 Table 3: Ethnicity, 2000-2010 % Change EthnicityNumber% of TotalNumber% of Total2000-2010 Non-Hispanic48,53696.0%56,18996.4%15.8% White24,18147.8%17,08529.3%-29.3% Black/African American3190.6%3220.6%0.9% American Indian/Alaskan Native800.2%800.1%0.0% Asian22,41444.3%36,81563.1%64.3% Native Hawaiian/Pacific Islander580.1%390.1%-32.8% Some Other Race1240.2%1100.2%-11.3% 2+ Races1,3602.7%1,7383.0%27.8% Hispanic 2,010 4.0%2,113 3.6%5.1% Total 50,546100.0%58,302100.0%15.3% % Change Ethnicity Number% of TotalNumber% of Total2000-2010 Non-Hispanic 1,279,18476.0%1,302,43273.1%1.8% White 744,28244.2%626,90935.2%-15.8% Black/African American 44,4752.6%42,3312.4%-4.8% American Indian/Alaskan Native5,2700.3%4,0420.2%-23.3% Asian 426,77125.4%565,46631.7%32.5% Native Hawaiian/Pacific Islander5,0400.3%6,2520.4%24.0% Some Other Race 3,5220.2%3,8770.2%10.1% 2+ Races 49,8243.0%53,5553.0%7.5% Hispanic 403,401 24.0%479,210 26.9%18.8% Total 1,682,585100.0%1,781,642100.0%5.9% Bay Area (a) 2000 2010 % Change Ethnicity Number% of TotalNumber% of Total2000-2010 Non-Hispanic 5,468,58580.6%5,468,93976.5%0.0% White 3,392,20450.0%3,032,90342.4%-10.6% Black/African American 497,2057.3%460,1786.4%-7.4% American Indian/Alaskan Native24,7330.4%20,6910.3%-16.3% Asian 1,278,51518.8%1,645,87223.0%28.7% Native Hawaiian/Pacific Islander33,6400.5%41,0030.6%21.9% Some Other Race 18,4510.3%20,0240.3%8.5% 2+ Races 223,8373.3%248,2683.5%10.9% Hispanic 1,315,175 19.4%1,681,800 23.5%27.9% Total 6,783,760100.0%7,150,739100.0%5.4% Notes: (a) The nine-county Bay Area includes Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, and Sonoma counties. Sources: U.S. Census 2000 & 2010; BAE, 2013. Cupertino 2000 2010 Santa Clara County 2000 2010 1020 GENERAL PLAN AMENDMENT – MARKET STUDY 19 Household Income Distribution Households in Cupertino earn significantly higher annual incomes than households in Santa Clara County and the Bay Area. ACS data indicate that the median annual household income in Cupertino was almost $124,000, approximately $37,000 higher than the median household income in Santa Clara County ($87,148) and $48,000 more than the median income in the Bay Area ($75,837). Income disparity between Cupertino and the region was most substantial in the high income categories. Approximately one quarter of all households in Cupertino had an annual income of $200,000 or more, while only 14 percent of households in Santa Clara County and 11 percent of households in the Bay Area had an annual income of $200,000 or more. Table 4: Household Income (a) Santa Clara Income CategoryCupertinoCountyBay Area (b) Less than $15,0004.7%7.4%8.8% $15,000-$24,9995.6%6.6%7.5% $25,000-$34,9992.7%6.1%7.1% $35,000-$49,9995.7%9.3%10.3% $50,000-$74,99910.8%14.1%15.8% $75,000-$99,9998.1%12.3%12.2% $100,000-$149,99922.3%18.9%17.5% $150,000-$199,99914.2%11.0%9.3% $200,000 or more25.8%14.3%11.3% Total 100.0%100.0%100.0% Median HH Income$123,717$87,148$75,837 Per Capita Income$50,749$39,290$38,235 Notes: (a) The American Community Survey (ACS) publishes demographic estimates based on statistical sampling conducted between 2009-2011. (b) The nine-county Bay Area includes Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, and Sonoma counties. Sources: ACS, 2009-2011; BAE, 2013. Educational Attainment ACS data indicate that Cupertino residents tend to have a high level of educational attainment. Among residents age 25 and older, almost all Cupertino residents (96 percent) have earned a high school diploma, compared to 86 percent of Santa Clara County residents and 87 percent of Bay Area residents, as shown in Table 5 below. More than three quarters of Cupertino residents age 25 and older have a college degree, compared to approximately half of the population age 25 and older in Santa Clara County and the Bay Area. Moreover, the share of Cupertino residents age 25 and older with a graduate or professional degree (40 percent) is twice as high as the proportion of residents age 25 and older with a graduate or professional degree in Santa Clara County (20 percent) and the Bay Area (17 percent). 1021 GENERAL PLAN AMENDMENT – MARKET STUDY 20 Table 5: Educational Attainment for Population 25+ Year of Age (a) Santa ClaraBay Educational Attainment CupertinoCountyArea (b) Less than 9th Grade 2.1%7.3%7.1% 9th to 12th Grade, No Diploma 1.9%6.2%6.0% High School Graduate (incl. Equivalency)6.7%16.3%18.0% Some College, No Degree 10.6%17.6%19.6% Associate Degree 5.0%7.1%7.2% Bachelor's Degree 33.3%25.6%25.3% Graduate/Professional Degree 40.3%20.0%16.8% Total 100.0%100.0%100.0% Population with College Degree 78.6%52.7%49.2% Notes: (a) The American Community Survey (ACS) publishes demographic estimates based on statistical sampling conducted between 2009-2011. (b) The nine-county Bay Area includes Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, and Sonoma counties. Sources: ACS, 2009-2011; BAE, 2013. Schools The public school districts that serve Cupertino are known for providing high quality education to students in kindergarten through twelfth grade. The city is served by the Cupertino Union School District for kindergarten through eighth grade and the Fremont Union High School District for ninth grade through twelfth grade. Like all public schools in California that serve students in kindergarten through twelfth grade, the schools that serve Cupertino are rated based on Academic Performance Index (API) scores, which is a composite score based on statewide standardized test results. API scores range from 200 to 1,000, with a higher score indicating higher test results. In 2012, all of the 25 schools in the Cupertino Union School District had an API score over the statewide performance target of 800, including 22 schools with an API score over 900 The 2012 API score for the five schools in the high school district that serves Cupertino (the Fremont Union High School District) ranged from 766 to 957, and all but one school in the district had an API score of 874 or above. Strong educational performance has been accompanied by rising enrollments in Cupertino schools. Enrollment in the Cupertino Union School District has increased by nearly twenty percent over the past ten years to 19,230 in the 2013-14 school year. The Fremont Union High School District has grown by 14.5 percent over the same time period to its current enrollment of 10,665 students. This growth in enrollment has occurred even though housing production within the City has been limited over the past several years. Due in part to high API scores, the school districts that serve Cupertino have earned a prestigious reputation that enhances the desirability of the city as a residential location for families with school-aged children. This is reflected in the demographic data discussed above, which shows that a large share of Cupertino households include children under 18 1022 GENERAL PLAN AMENDMENT – MARKET STUDY 21 Resident Occupation and Employment ACS provides data on resident employment by occupation and by industry, which is shown in Table 6. Occupation data relate to the type of tasks workers perform, whereas industry data relate to the economic sector in which a worker is employed. ACS also provides data on workers employed in Cupertino, which will be discussed in a subsequent section. According to ACS data, Cupertino residents are significantly more concentrated in management, business, science, and arts occupations than are residents of Santa Clara County or the Bay Area. While these occupations employ more than three quarters of employed Cupertino residents, less than half of all residents in Santa Clara County or the Bay Area are employed in these occupations. Relative to the county and region, Cupertino had a small share of residents in all other occupational categories, particularly service occupations. Four percent of employed Cupertino residents held service occupations, compared to 14 percent of employed Santa Clara County residents and 16 percent of all employed residents in the Bay Area. Individuals employed in management, business, and science occupations tend to earn more than people employed in service or other occupations, which is consistent with the high household incomes in Cupertino. Cupertino residents also differed from residents of Santa Clara County and the Bay Area in terms of industries of employment. Manufacturing employed the largest proportion of residents in Cupertino, employing more than one quarter (28 percent) of employed residents, while only 20 percent of Santa Clara residents and 11 percent of Bay Area residents worked in the manufacturing industry. Given the nature of the Silicon Valley economy, it is likely that many Cupertino residents working in the manufacturing industry work in high-tech fields such as computer or software design. Aside from manufacturing, the largest source of employment for Cupertino residents was the professional, scientific, management, and administrative industry, which accounted for 25 percent of resident employment. This was followed by the education, health care, and social assistance industry, which accounted for 17 percent of resident employment. The education, health care, and social assistance industry accounted for a larger share of resident employment in Santa Clara County (18 percent) and the Bay Area (20 percent). 1023 GENERAL PLAN AMENDMENT – MARKET STUDY 22 Table 6: Employed Residents by Occupation and Industry (a) CupertinoSanta Clara CountyBay Area (b) Occupation Number% TotalNumber% TotalNumber% Total Management, Business, Science, Arts 19,15677.5%410,32449.6%1,515,45844.9% Service 1,0544.3%117,61814.2%547,81016.2% Sales & Office 3,49914.2%174,18321.0%781,90923.2% Natural Resources, Construction, Maintenance 4882.0%56,7666.9%247,8497.3% Production, Transportation, Material Moving 5242.1%68,9678.3%274,8538.1% Military Specific Occupations 0 0.0%224 0.0%7,010 0.2% Total 24,721100.0%828,082100.0%3,374,889100.0% CupertinoSanta Clara CountyBay Area (b) Industry Number% TotalNumber% TotalNumber% Total Agriculture, Forestry, Fishing, Hunting, Mining 360.1%4,1280.5%26,7410.8% Construction 4121.7%45,2945.5%200,3465.9% Manufacturing 6,99228.3%163,62219.8%381,88211.3% Wholesale Trade 5022.0%19,6992.4%89,9612.7% Retail Trade 1,5106.1%80,1759.7%345,93810.3% Transportation, Warehousing, Utilities 4131.7%22,9452.8%144,0084.3% Information 1,3575.5%32,0833.9%114,9543.4% Finance, Insurance, Real Estate 1,3355.4%42,6255.1%249,6257.4% Professional, Scientific, Mgmt., Admin 6,24925.3%149,20918.0%543,61416.1% Educational Svcs., Health Care, Social Assistance4,10716.6%151,22318.3%683,18420.2% Arts, Entertainment, Rec, Accomod., Food Svcs.7343.0%59,1547.1%289,0928.6% Other Svcs., Except Public Administration 7152.9%35,4684.3%166,0564.9% Public Administration 3511.4%21,8392.6%125,9963.7% Armed Forces 8 0.0%618 0.1%13,492 0.4% Total 24,721100.0%828,082100.0%3,374,889100.0% Note: (a) The American Community Survey (ACS) data used in this table is based on statistical sampling conducted between 2007-2011. Data are reported for workers age 16 & older. Sources: ACS, 2007-2011; BAE, 2013. Commute Flow Cupertino has more jobs than employed residents, leading to a net inflow of workers to the city, and most Cupertino residents work in Cupertino or neighboring cities. Table 7 shows work locations for Cupertino residents, as well as where people employed in Cupertino live, based on ACS data collected between 2006 and 2008 (the most recent time period for which these data are available). According to these data, Approximately 24,000 Cupertino residents were employed in various locations, while the total number of jobs in the city was estimated at approximately 32,000. Approximately one fifth of all employed Cupertino residents (21 percent) both lived and worked in Cupertino –suggesting the importance of creating nice places to shop and dine both during the work day as well as evenings and weekends. Most of the employed Cupertino residents that did not work in the city worked in cities adjacent to Cupertino, including San Jose, Sunnyvale, and Santa Clara. Only 13 percent of employed Cupertino residents worked outside of Santa Clara County. Similarly, most of the people that are employed in Cupertino live either in Cupertino or adjacent cities. Approximately one third (31 percent) of people employed in Cupertino live in 1024 GENERAL PLAN AMENDMENT – MARKET STUDY 23 San Jose, 16 percent live in Cupertino, and 34 percent live elsewhere in Santa Clara County. These data indicate that there is a significant amount of cross-commuting between Cupertino and other locations within Santa Clara County, but cross commuting between Cupertino and locations outside of Santa Clara County is relatively limited. Table 7: Commute Flow (a) Cupertino Residents by Place of Work Cupertino Workers by Place of Residence Employed Persons Employed Persons Place of WorkNumberPercentagePlace of ResidenceNumberPercentage Santa Clara County21,33087.2%Santa Clara County25,59580.5% San Jose 5,26521.5%San Jose 9,81030.9% Cupertino 5,06020.7%Cupertino 5,06015.9% Sunnyvale 2,80511.5%Sunnyvale 2,8058.8% Santa Clara 2,66010.9%Santa Clara 2,2607.1% Mountain View 1,6456.7%Mountain View 9603.0% Palo Alto 1,3905.7%Saratoga 9403.0% Milpitas 5552.3%Campbell 8252.6% Campbell 3651.5%Los Altos 5251.7% Los Altos 3601.5%Palo Alto 5051.6% Other Cities 4902.0%Other Cities 1,3554.3% Unincorporated 7353.0%Unincorporated 5501.7% All Other Locations3,120 12.8%San Mateo County1,6905.3% Total24,450100.0%Alameda County1,3554.3% San Francisco1,3354.2% All Other Locations1,810 5.7% Total 31,785100.0% Notes: (a) The American Community Survey (ACS) data used for the most recent Census Transportation Planning Package (CTPP) uses demographic estimates based on statistical sampling conducted between 2006-2008. Data is reported for workers age 16 and over. Sources: 2006-2008 Census Transportaion Planning Package; ACS, 2006-2008; BAE, 2013. Implications for General Plan Amendment  Cupertino’s strong demographics –families with high incomes—constitutes a strong base of potential support for renovated or new retail facilities.  The city has relatively few younger households and singles, indicating potential support for smaller residential units (both for-sale and rental).  Cupertino’s excellent public schools will continue to be a major driver of demand for new residential development and helps moderate adverse impacts of recessionary economic conditions.  While there are approximately 31,800 jobs in Cupertino, there are approximately 5,100 residents in the city who also work in Cupertino, indicating a net inflow of approximately 26,700 workers into the community who will make convenience retail expenditures. 1025 GENERAL PLAN AMENDMENT – MARKET STUDY 24 EMPLOYMENT TRENDS Cupertino is a strong employment location with a net inflow of workers from other cities. To the extent that Cupertino residents work outside of the city and residents from other areas work in Cupertino, the city’s daytime population differs from its resident population. The following section provides information on major employers in Cupertino as well as on occupation, employment industry, age, income, race, and ethnicity of people employed in Cupertino, based on data from the U.S. Census ACS. Data on age, income, race, and ethnicity are drawn from the US Census Transportation Planning Package (CTPP). The most current data provided by CTPP is based on ACS data collected between 2006 and 2008. Major Employers According to the 2012 Comprehensive Annual Financial Report for Cupertino, Apple Inc. was the largest employer in the city, with approximately 13,000 employees. The number of people employed at Apple Inc. was more than four times the number of people employed at the city’s second largest employer, Hewlett-Packard, and far surpassed the number of people employed at the remaining eight largest employers in the city. As shown in Table 8, the ten top employers in Cupertino in 2012 consisted primarily of tech companies, educational institutions, and healthcare services, followed by Target. In addition to Apple Inc., tech companies among the city’s ten largest employers included Hewlett-Packard, Chordiant Software (a company providing customer relationship management software and services), and Trend Micro Inc. (an Internet content security and threat management provider). Although these are the largest tech companies in Cupertino, large tech companies such as these tend to create clusters of other high-tech firms, spin-off companies, and support services for the industry, as documented extensively in several academic studies. This suggests that the presence of these large high-tech companies in Cupertino leads other companies to seek out locations in Cupertino, creating demand for office development, which will be discussed in further detail in later sections of this analysis. Major employers among education providers consisted of Cupertino Union School District, Fremont Union School District, and the De Anza School District. Both of the healthcare services included among the city’s top ten employers in 2012 were located at senior living communities in Cupertino. 1026 GENERAL PLAN AMENDMENT – MARKET STUDY 25 Table 8: Principal Employers in Cupertino, 2012 Number of EmployerEmployees Apple Inc.13,000 Hewlett-Packard3,000 Cupertino Union School District1,474 Foothill/DeAnza Community College District1,291 Fremont Union High School District846 Chordiant Software285 Trend Micro Inc.250 Health Care Center at The Forum250 Target Stores220 Cupertino Healthcare and Wellness180 Source: City of Cupertino, Comprehensive Annual Financial Report, 2012; BAE, 2013. Jobs by Occupation and Industry Table 9 provides data on occupation and industry for jobs located in Cupertino, Santa Clara County, and Bay Area based on data from the ACS. These data represent jobs for which the workplace is located in Cupertino, rather than jobs held by Cupertino residents. As shown, employment in Cupertino is concentrated in management, business, science, and arts occupations, which represented 61 percent of all jobs in the city. Compared to the county and region, Cupertino had a small share of jobs in all other occupational categories, particularly natural resources, construction, and maintenance occupations and production, transportation, and material moving occupations. ACS data indicate that manufacturing was the largest employment industry in Cupertino, representing 29 percent of employment, followed by the professional, scientific, management, and administrative services industry, which represented 20 percent of employment. Cupertino also has significant employment in the educational services, health care, and social assistance industry, which represented 17 percent of employment in the city. These three industries were also the three largest employment industries in Santa Clara County and the Bay Area; however, employment in Cupertino was more heavily concentrated in manufacturing and less concentrated in educational services, healthcare, and social assistance than employment in the county and region overall. The significant share of manufacturing employment in Cupertino is due to employers in high-tech fields, including Apple Inc. and Hewlett-Packard, which are typically classified as companies in the computer and electronics manufacturing industry. A large share of high-tech employment in Cupertino, including management, science, and service occupations, is classified within the manufacturing industry, despite that the production-related occupations associated with these companies are usually located elsewhere. 1027 GENERAL PLAN AMENDMENT – MARKET STUDY 26 Table 9: Occupation and Industry by Workplace Location (a) CupertinoSanta Clara CountyBay Area (b) Occupation Number% TotalNumber% TotalNumber% Total Management, Business, Science, Arts 20,59561.1%477,90351.4%1,555,52744.5% Service 4,10512.2%125,37413.5%562,08216.1% Sales & Office 6,77820.1%189,90520.4%803,38223.0% Natural Resources, Construction, Maintenance 9322.8%66,1077.1%270,8267.8% Production, Transportation, Material Moving 1,3083.9%70,3497.6%294,1688.4% Military Specific Occupations 0 0.0%314 0.0%7,205 0.2% Total 33,718100.0%929,952100.0%3,493,190100.0% CupertinoSanta Clara CountyBay Area (b) Industry Number% TotalNumber% TotalNumber% Total Agriculture, Forestry, Fishing, Hunting, Mining 150.0%5,0430.5%28,2680.8% Construction 6822.0%52,6945.7%220,4196.3% Manufacturing 9,61528.5%188,17420.2%401,66811.5% Wholesale Trade 6401.9%21,4012.3%94,8592.7% Retail Trade 4,06612.1%86,7839.3%355,80610.2% Transportation, Warehousing, Utilities 4321.3%24,8112.7%153,9524.4% Information 8202.4%39,2014.2%118,4843.4% Finance, Insurance, Real Estate 1,6354.8%44,7974.8%254,4127.3% Professional, Scientific, Mgmt., Admin 6,63319.7%166,73417.9%559,57216.0% Educational Svcs., Health Care, Social Assistance5,81017.2%175,87518.9%697,02920.0% Arts, Entertainment, Rec, Accomod., Food Svcs.2,1986.5%62,4366.7%293,2758.4% Other Svcs., Except Public Administration 7242.1%36,1843.9%168,9714.8% Public Administration 4481.3%25,0642.7%132,7263.8% Armed Forces 0 0.0%755 0.1%13,749 0.4% Total 33,718100.0%929,952100.0%3,493,190100.0% Note: (a) The American Community Survey (ACS) data used in this table is based on statistical sampling conducted between 2007-2011. Data are reported for workers age 16 & older. Sources: ACS, 2007-2011; BAE, 2013. 1028 GENERAL PLAN AMENDMENT – MARKET STUDY 27 Worker Age Distribution Similar to Cupertino residents, people employed in Cupertino consist of a smaller share of people between age 21 and 34 than people employed in Santa Clara County overall. As shown in Table 10, CTPP data indicate that 24 percent of people employed in Cupertino were between age 21 and 34, compared to 28 percent in the county, and a higher proportion of workers between age 35 and 59 (65 percent in the city and 60 percent in the county). The comparative shortage of employees in younger age groups suggests a potential need for housing in Cupertino that is targeted to workers between the ages of 21 and 34, including small, affordable multifamily units in an amenity-enriched environment, to attract a younger workforce to the city. Table 10: Employee Age Distribution (a) CupertinoSanta Clara County Age CohortNumberPercentNumberPercent 16 to 17 years4701.5%6,8900.7% 18 to 20 years9553.0%30,7503.3% 21 to 24 years11803.7%60,9506.6% 25 to 34 years6,34019.9%200,18021.5% 35 to 44 years10,13031.9%257,35527.7% 45 to 59 years10,49533.0%300,32532.3% 60 to 64 years1,1653.7%43,6554.7% 65 to 74 years8302.6%25,3952.7% 75 years and older220 0.7%4,250 0.5% Total (b)31,785100.0%929,745100.0% Median Age 41.9 41.5 Notes: (a) The American Community Survey (ACS) data used for the most recent Census Transportation Planning Package (CTPP) uses demographic estimates based on statistical sampling conducted between 2006-2008. Data is reported for workers age 16 and over. (b) Totals may not sum due to independent rounding of categories. Sources: 2006-2008 Census Transportaion Planning Package; ACS, 2006-2008; BAE, 2013. 1029 GENERAL PLAN AMENDMENT – MARKET STUDY 28 Worker Income Workers employed in Cupertino tend to have higher earnings than workers employed in Santa Clara County overall. Table 11 shows worker earnings during the past 12 months for people employed in Cupertino and Santa Clara County, based on CTPP data. As shown, median earning for workers employed in Cupertino was $81,000 per year (in 2013 dollars), while median earnings in Santa Clara County ($57,000 in 2013 dollars) was only 70 percent of the Cupertino median. The disparity in incomes between the city and county is reflected throughout the earnings distribution for workers (expressed in 2008 dollars), which shows that Cupertino has a smaller proportion of workers in all income brackets under $65,000 per year and a higher proportion of workers in all higher income brackets. Inflated to 2013 dollars, $65,000 in 2008 dollars is equal to approximately $71,600. More than one third of all workers in Cupertino (37 percent) had an income over $100,000 ($110,200 in 2013 dollars), compared to less than one quarter (24 percent) of workers in Santa Clara County. Table 11: Worker Earnings in the Past 12 Months (a) CupertinoSanta Clara County Annual Earnings (b)NumberPercentNumberPercent No earnings in the past 12 months 00.0%2150.0% $1 to $9,999 or less 2,8258.9%87,0609.4% $10,000 to $14,999 1,3354.2%50,4705.4% $15,000 to $24,999 2,5408.0%102,48011.0% $25,000 to $34,999 2,3507.4%95,88510.3% $35,000 to $49,999 2,6908.5%117,63512.7% $50,000 to $64,999 2,6358.3%101,81011.0% $65,000 to $74,999 1,7655.6%47,2305.1% $75,000 to $99,999 3,91012.3%105,41511.3% $100,000 or more 11,735 36.9%221,545 23.8% Total (c)31,785100.0%929,745100.0% Median Annual Earnings (d)$81,087 $56,912 Cupertino as Percent of County142.5% Notes: (a) The American Community Survey (ACS) data used for the most recent Census Transportation Planning Package (CTPP) uses demographic estimates based on statistical sampling conducted between 2006-2008. Data is reported for workers age 16 and over. (b) Figures in distribution are shown in 2008 dollars. (c) Totals may not sum due to independent rounding of categories. (d) Median annual earnings are inflated to 2013 dollars. Sources: 2006-2008 Census Transportaion Planning Package; ACS, 2006-2008; BAE, 2013. 1030 GENERAL PLAN AMENDMENT – MARKET STUDY 29 Worker Ethnicity CTPP data indicate that people that work in Cupertino differ from workers in Santa Clara County overall and from Cupertino residents with respect to racial and ethnic background. Compared to workers in Santa Clara County overall, a large proportion of workers in Cupertino is White (49 percent) or Asian (34 percent) and small proportion is Hispanic or Latino (12 percent) or Black or African American (two percent), as shown in Table 12. Despite the relatively large portion of Asian individuals employed in Cupertino, these data demonstrate a small proportion of Asian employees given that almost two thirds of Cupertino residents are of Asian descent (as shown in Table 3 and discussed above). The difference in racial and ethnic background between Cupertino residents and people employed in Cupertino suggests a need to maintain diverse retail options in the city to capture demand from local workers as well as residents. Table 12: Worker Race and Ethnicity (a) CupertinoSanta Clara County Race & EthnicityNumberPercentNumberPercent Hispanic or Latino3,94512.4%218,99023.6% Not Hispanic or Latino27,83587.6%710,75576.4% White15,51548.8%395,04042.5% Black or African Amercian5351.7%26,0902.8% Asian10,95034.5%265,73528.6% All Other Races & Two or More Races840 2.6%23,895 2.6% Total (b)31,785100.0%929,745100.0% Notes: (a) The American Community Survey (ACS) data used for the most recent Census Transportation Planning Package (CTPP) uses demographic estimates based on statistical sampling conducted between 2006-2008. Data is reported for workers age 16 and over. (b) Totals may not sum due to independent rounding of categories. Sources: 2006-2008 Census Transportaion Planning Package; ACS, 2006-2008; BAE, 2013. Implications for General Plan Amendment  As the city’s largest employer with over 13,000 employees, Apple Inc. impacts the demand for office space in Cupertino through its own internal growth and acquisitions, attraction of firms doing business with Apple, as well as through spin- offs and start-ups established by Apple Inc. employees.  The ethnic profile of workers in Cupertino is different than the profile for the resident population. While the resident population in the city is over 63 percent of Asian ethnicities, just under 35 percent of workers are of Asian ethnicities. Compared to the city’s residential population, a larger percent of workers are of non-Hispanic white and Hispanic or Latino race and ethnicity. This suggests that retail in Cupertino must cater to a more diverse base of customers than reflected by the city resident profile alone.  Overall, Cupertino has a highly compensated workforce that provides a strong base of potential demand for housing closer to work and for retail sales during the 1031 GENERAL PLAN AMENDMENT – MARKET STUDY 30 workday, although potential retail support is somewhat tempered by onsite food service and other amenities offered by major employers such as Apple Inc. However, the General Plan Amendment should make the city attractive to younger workers by providing more affordable housing in smaller units. 1032 GENERAL PLAN AMENDMENT – MARKET STUDY 31 RETAIL SALES AND LEAKAGE ANALYSIS This section of the market study for the Cupertino General Plan Amendment examines retail sales conditions in Cupertino, its Retail Trade Area, and the surrounding region. The purpose of the analysis is to identify potential market support for new or repurposed retail development in the seven study areas that can be later used to evaluate the commercial development allocations under the city’s General Plan. The data presented here and in the Retail Market Overview are also used as foundational information for the separate Retail Strategy Report prepared by Greensfelder Commercial Real Estate LLC. Data for the city and the Retail Trade Area are presented, along with comparative data from Santa Clara County and California. For the purposes of this analysis, the Retail Trade Area (RTA) is defined as the area which is easily accessible for Cupertino residents. The RTA was generally defined by taking a ten-minute drive time from Cupertino (specifically, from the Vallco Shopping Mall), and grouping together the Zip Codes within that ten-minute drive time. Additionally, areas roughly to the east of Interstate 880 in San Jose have been excluded. Figure 3 shows the boundaries of the RTA. Figure 3: Cupertino and the Retail Trade Area See Appendix for listing of Zip Codes making up the Retail Trade Area. Source: BAE, 2013. 1033 GENERAL PLAN AMENDMENT – MARKET STUDY 32 The goal of the leakage analysis for the city is to identify the relative strength of the city’s retail sectors. Using the city boundary in doing a leakage analysis is somewhat arbitrary, since the city is surrounded by other cities with considerable retail development and is not set apart from other locales by physical boundaries such as hills or water. As a result, the city boundary does not represent a constraint on Cupertino residents shopping elsewhere or non-residents shopping in Cupertino. However, a leakage analysis for the city can show sectors where the city might have an opportunity to capture more sales locally from its residents and employees (while perhaps also attracting shoppers from nearby areas). To provide context, a leakage analysis for the larger RTA should indicate the level of shopping opportunities available to Cupertino residents even if certain types of stores and goods are not present in the city. Furthermore, the presence of these stores nearby and their ability to attract city residents and workers may act as a constraint on Cupertino’s ability to attract additional retail development even if the analysis indicates that city residents and workers are not purchasing goods within Cupertino itself. The primary source of information on general retail expenditures in California is the taxable retail sales data published by the State Board of Equalization (SBOE). SBOE publishes Taxable Sales in California, a quarterly and annual publication that reports taxable sales by major store categories by city and county. With adjustments made to take into account nontaxable sales such as food and prescriptions, this source usually offers the best baseline data for jurisdictions for which it is available. Beginning in 2009, SBOE used a new categorization of businesses that makes comparisons over time problematic, but some general statements about the overall level of retail sales can still be made. In Cupertino, data analysis is faced with the additional issue that taxable sales generated by Apple make up a disproportionate share of the total. According to Economic and Fiscal Impacts Generated by Apple in Cupertino – Current Facilities and Apple Campus 2,5 Apple Inc. accounts for $1.3 billion in taxable sales in Cupertino in 2012, which provides 45 percent of the city’s sales tax revenues. These sales consist of online merchandise sales where Cupertino is the point of sale, sales at the Apple Company Store, taxable sales of cafeteria food and other items to employees, and use taxes paid by Apple for equipment imported from out of state for its own internal use in Cupertino. Additionally, SBOE’s home furnishings and appliances category (which includes computer and electronics retailers) is not disclosed and garners a disproportionate share of sales relative to Cupertino’s, thus making use of the taxable sales data in any leakage analysis problematic. 5 Keyser Marston Associates, May 2013, prepared for Apple Inc. 1034 GENERAL PLAN AMENDMENT – MARKET STUDY 33 Furthermore, SBOE does not provide data for portions of cities, and the RTA does not follow city boundaries, particularly for San Jose, which extends far beyond the defined RTA. Because of these limitations with SBOE data for Cupertino and the RTA, the leakage analysis itself utilizes retail sales estimates based on 2011 Zip Code and County Business Patterns employment data benchmarked to data on sales per employee from the 2007 Economic Census, with adjustments by category made based on crosschecks with SBOE data and to reflect more current conditions as needed. Use of this source also allows for a more fine-grained level of analysis by store type. Estimated Retail Sales in Cupertino and the RTA by Major Retail Category As noted above, because of disclosure issues, the level of detail available for Cupertino in SBOE data is insufficient for the analysis here and the analysis would not be possible for the RTA utilizing SBOE data, so to compare actual expenditures in Cupertino and RTA retail outlets with potential expenditures by store category, an alternative estimate methodology for estimating sales for the two geographies has been developed. This point-in-time estimate can then cover all store categories in a way not possible based on SBOE data. For comparative purposes and as a benchmark, similar estimates have been derived for Santa Clara County and California. As noted above, these estimates have been derived using the most recent available data from the Census of Retail Trade and County and Zip Code Business Patterns. These estimates provide point-in-time data for Cupertino and the RTA by detailed retail category. Further explanation of the methodology can be found in Appendix D and in the footnotes for Table 13. For the purposes of the analysis here, the estimated retail sales have been grouped into eleven categories, corresponding to major 3-digit NAICS retail categories:  Motor Vehicle and Parts Dealers  Home Furnishings and Appliance Stores  Bldg. Materials and Garden Equipment and Supplies  Food and Beverage Stores  Health and Personal Care Stores  Gasoline Stations  Clothing and Clothing Accessories Stores  Sporting Goods, Hobby, Book, and Music Stores  General Merchandise Stores6 6 Includes stores that sell a broad range of merchandise. Examples include traditional department stores such as Macy’s, discount department stores such as Walmart, and warehouse stores such as Costco. 1035 GENERAL PLAN AMENDMENT – MARKET STUDY 34  Miscellaneous Store Retailers  Food Services and Drinking Places7 Sales at non-store retailers (e.g., electronic online sales, mail order, and auction houses) are excluded from the analysis, as are sales occurring at non-retail outlets. This effectively factors Apple’s sales out of the analysis. As shown in Table 13, retail sales for the city for 2011 are estimated at approximately $615 million (all sales presented in inflation-adjusted 2013 dollars unless otherwise noted).8 The three largest categories are food and beverage stores at 27 percent of sales, food services and drinking places at 22 percent, and general merchandise stores at 20 percent. These three sectors are disproportionately large in Cupertino relative to the county, or the state. Cupertino has very limited sales in the automotive sector. Retail sales in the RTA for 2011 are estimated at approximately $9.1 billion; the three largest store categories are motor vehicles and parts (22 percent), food and beverage (17 percent) and food services and drinking places (14 percent). The retail mix is generally much more in balance relative to the county and the state, with the exception of the motor vehicle and parts sector at 22 percent versus 17 percent for the county and 18 percent for the state. The leakage analysis below will provide a clearer picture of the city’s retail strengths and weaknesses, but per capita sales comparisons by category are a first indicator of strengths and weaknesses in Cupertino’s retail sector. On a per capita basis, Cupertino’s 2011 retail sales at $10,483 annually are low compared to $13,404 for the county and $12,493 for California. Several sectors have per capita sales at less than half of the level of the county overall; the automotive sector is at only six percent of county, and three other sectors (electronics and appliance stores, building materials and garden equipment and supplies, and miscellaneous store retailers) are at less than half of countywide per capita sales levels. Four sectors (food and beverage stores, gasoline stations, general merchandise stores, and food services and drinking places) have per capita sales that exceed Santa Clara County levels. In contrast to Cupertino, the RTA overall had much higher 2011 per capita sales ($15,807) than either the county or the state. Only two major retail sectors, clothing and clothing accessory stores and general merchandise stores, had per capita sales below countywide levels. This indicates that overall, the RTA as a whole has a strong retail sector with a broad range of shopping opportunities accessible to Cupertino residents. 7 This category includes all types of restaurants, as well as catering services. 8 It is important to note this includes non-taxable sales. 1036 GENERAL PLAN AMENDMENT – MARKET STUDY 35 Table 13: Total Estimated 2011 Retail Sales Sales in 2013 $000 (a)RetailSanta Clara CupertinoTrade AreaCountyCalifornia Motor Vehicle and Parts Dealers$8,000$1,968,000$4,199,000$85,256,000 Furniture and Home Furnishings Stores$14,000$180,000$516,000$10,476,000 Electronics and Appliance Stores$14,000$474,000$1,200,000$15,105,000 Bldg. Matrl. and Garden Equip. and Supplies$13,000$572,000$1,604,000$29,169,000 Food and Beverage Stores$163,000$1,506,000$4,102,000$81,925,000 Health and Personal Care Stores$34,000$412,000$1,135,000$25,280,000 Gasoline Stations$52,000$671,000$1,534,000$41,495,000 Clothing and Clothing Accessories Stores$40,000$576,000$2,105,000$33,993,000 Sporting Goods, Hobby, Book, and Music Stores$16,000$314,000$586,000$8,968,000 General Merchandise Stores$126,000$870,000$2,818,000$60,903,000 Miscellaneous Store Retailers$2,000$237,000$555,000$11,385,000 Food Services and Drinking Places$133,000$1,305,000$3,697,000$63,640,000 Retail Outlets Total $615,000$9,085,000$24,051,000$467,595,000 Sales per Capita in 2013 $ RetailSanta Clara CupertinoTrade AreaCountyCalifornia Motor Vehicle and Parts Dealers$136$3,424$2,340$2,278 Furniture and Home Furnishings Stores$239$313$288$280 Electronics and Appliance Stores$239$825$669$404 Bldg. Matrl. and Garden Equip. and Supplies$222$995$894$779 Food and Beverage Stores$2,778$2,620$2,286$2,189 Health and Personal Care Stores$580$717$633$675 Gasoline Stations$886$1,167$855$1,109 Clothing and Clothing Accessories Stores$682$1,002$1,173$908 Sporting Goods, Hobby, Book, and Music Stores$273$546$327$240 General Merchandise Stores$2,148$1,514$1,570$1,627 Miscellaneous Store Retailers$34$412$309$304 Food Services and Drinking Places$2,267$2,271$2,060$1,700 Retail Outlets Total $10,483$15,807$13,404$12,493 2011 Population (b)58,665574,7411,794,33737,427,946 Notes: Sales estimates were initially generated using 2011 Zip Code and County Business Patterns employment data along with per- employee sales data by detailed NAICS code from the 2007 Economic Census. These numbers by major category above were then cross-checked against SBOE data and 2007 Economic Census data where available to confirm, with adjustments made as indicated by inconsistencies between the sources. Because of differences in categorization schemes, data by category may not be directly comparable to SBOE numbers presented elsewhere. 2011 represents most recent data available at time of analysis. Cupertino data based on Zip Codes, and includes some areas outside the city; however, these areas are largely unpopulated. RTA data also based on Zip Codes per discussion in text. (a) Retail sales have been adjusted to 2013 dollars based on the Bay Area and California Consumer Price Index calculated by the California Department of Industrial Relations (based on data from the Bureau of Labor Statistics) for California, and the Bay Area Consumer Price Index from the U.S. Bureau of Labor Statistics for the city and county. Total sales estimates are rounded to nearest million $. (b) Population from CA State Dept. of Finance, except for Retail Trade Area. RTA population is based on Nielsen estimates for 2010 and 2013, assuming constant percentage growth over the period. Sources: 2010 U.S. Census; U.S. Census of Retail Trade, 2007; Zip Code and County Business Patterns, 2010; CA Dept. of Industrial Relations; U.S. Bureau of Labor Statistics; Nielsen MarketPlace; BAE, 2013. 1037 GENERAL PLAN AMENDMENT – MARKET STUDY 36 Trends in Retail Sales The following section presents historic data on retail sales by major store/outlet category, to supplement the single-year estimate provided in the previous section and provide an overview of longer-term trends. This summary relies on taxable sales data published by SBOE for Cupertino, Santa Clara County, and California.9 All data are presented in constant 2013 dollars, based on the Bay Area and California Consumer Price Indexes. The following trends discussion covers only taxable sales, not total sales. For example, food purchases, prescription drugs, and services (e.g., auto repair) are not taxable; as a result, the estimates shown here are lower than provided by the Zip Code data discussed above and used below in the leakage analysis, which estimates all sales in the retail sector. Nevertheless, the taxable sales data are the best available indicator of retail sales trends by major store category over a period of years, even though they do not provide complete coverage of all sales in the retail sector. Because of the reclassification of businesses by SBOE beginning with 2009, it is difficult to consistently track retail sales by major store category across a longer period with the published data. Even a time series for overall retail sales is not necessarily accurate, as some businesses were moved out of retail and into the “all other outlets” category. As a result, retail sales by major category are discussed for the 2000 to 2008 period, and then separately for 2009 and later. The most recently SBOE-published data for the county and state were from 2011; an additional year (2012) was available for Cupertino based on data provided by City staff. This section first presents data from the county and California to provide context for the subsequent discussion of Cupertino itself. California As shown in Figure 4, taxable retail sales levels for California were relatively flat from 2000 through 2002. Statewide sales then increased gradually through 2005, with declines since that year. Inflation-adjusted estimated sales of $386 billion for 2008 were below 2000 levels (also inflation-adjusted), even as the population of the state increased by eight percent in the same period. In 2009, total inflation-adjusted taxable retail sales for the state were reported at $337 billion, indicating a further decline. 10 Sales have increased modestly since that time, to $370 billion in 2011. 9 Because the RTA includes portions of cities (especially San Jose), there are no published SBOE data available. 10 The reclassification of businesses in 2009 makes it possible that some of the change between 2008 and 2009 is due to businesses formerly classified as retail now being excluded from that group. 1038 GENERAL PLAN AMENDMENT – MARKET STUDY 37 Figure 4: California Taxable Retail Sales Trends, 2000-2011 - 5,000,000 10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 50,000,000 $0 $50,000,000 $100,000,000 $150,000,000 $200,000,000 $250,000,000 $300,000,000 $350,000,000 $400,000,000 $450,000,000 $500,000,000 200020012002200320042005200620072008200920102011 Po p u l a t i o n Ta x a b l e S a l e s i n $ 0 0 0 Total Taxable Retail Sales, 2000-2008 Total Taxable Retail Sales, 2009-2011 Population Note: All sales shown are in 2013 dollars. For details, see Appendix B. Source: BAE 2013, based on sources as noted in Appendix B. 1039 GENERAL PLAN AMENDMENT – MARKET STUDY 38 Santa Clara County Unlike statewide trends, Santa Clara County showed a pattern of considerable taxable retail sales declines early in the last decade during the “dot-com” bust which impacted the local economy considerably. This was followed by a mid-decade increase that was sustained longer than for the state, followed by another decline between 2007 and 2009 as the recession took hold. Sales have rebounded since 2009, but on an inflation-adjusted basis, sales are still below the 2000 levels of almost $27 billion in annual taxable retail sales. In 2011 taxable retail sales were approximately $20 billion countywide (see Figure 5).11 Figure 5: Santa Clara County Taxable Retail Sales Trends, 2000-2011 0 500,000 1,000,000 1,500,000 2,000,000 2,500,000 3,000,000 $0 $5,000,000 $10,000,000 $15,000,000 $20,000,000 $25,000,000 $30,000,000 200020012002200320042005200620072008200920102011 Po p u l a t i o n Ta x a b l e S a l e s i n $ 0 0 0 Total Taxable Retail Sales, 2000-2008 Total Taxable Retail Sales, 2009-2011 Population Note: All sales shown are in 2013 dollars. For details, see Appendix B. Source: BAE 2013, based on sources as noted in Appendix B. Cupertino From 2000 through 2003, taxable retail sales trends in Cupertino followed countywide trends, with a sharp decline following the dot-com bust (see Figure 6). However, while county sales overall began to recover in 2004, Cupertino’s taxable retail sales continued their slide through 2006. In 2007, Cupertino experienced an unusual jump in sales, with a decline again in 2008 to $646 million, well below the $819 million in 2000 (all in 2013 dollars). The large increase in 2007 was concentrated in the other retail stores category, which at that time included computer and software stores.12 Since 2008, taxable retail sales have been increasing in Cupertino at a faster 11 Because of the reclassification of businesses in 2009, it is possible that some of the change between 2008 and 2009 is due to businesses formerly classified as retail now being excluded from that group. 12 The SBOE reclassification in 2009 moved this retail store type into the home furnishings and appliances category. Further discussion of the retail mix by major store category in Cupertino can be found below. 1040 GENERAL PLAN AMENDMENT – MARKET STUDY 39 rate than statewide or countywide, with overall taxable retail sales reaching $752 million in 2012, which is still below 2000 levels on an inflation-adjusted basis. Figure 6: Cupertino Taxable Retail Sales Trends, 2000-2012 - 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 100,000 $0 $100,000 $200,000 $300,000 $400,000 $500,000 $600,000 $700,000 $800,000 $900,000 $1,000,000 2000200120022003200420052006200720082009201020112012 Po p u l a t i o n Ta x a b l e S a l e s i n $ 0 0 0 Total Taxable Retail Sales, 2000-2008 Total Taxable Retail Sales, 2009-2012 Population Note: All sales shown are in 2013 dollars. For details, see Appendix B. Source: BAE 2013, based on sources as noted in Appendix B. Much of the long-term decline in taxable retail sales was in the general merchandise store sector (see Appendix B for detailed data by major sector). Between 2000 and 2008, this sector’s sales declined by over 40 percent. While figures from 2009 and later are not directly comparable to prior years (e.g., drug stores were moved from this category into other retail), the decline has continued even as overall retail sales levels have recovered. The major stores in this sector include Target and the three Vallco Shopping Mall anchor stores. Apparel stores, another tenant typically found in fashion malls, have also seen a sales decline over time. Sales in the automotive sector, while relatively small even in 2000, dropped 94 percent by 2012. Food store sales have remained relatively stable over time, as grocery purchases as an everyday need are less vulnerable to overall changes in the economy. The restaurant sector (food services and drinking places) has fluctuated along with the overall economy over time, but has recovered to higher-than-2000 sales levels. 1041 GENERAL PLAN AMENDMENT – MARKET STUDY 40 Leakage Analysis Overview of Methodology Retail leakage and injection analysis compares actual retail sales in an area with some benchmark that provides a measure of the potential sales generated by that area's residents and workers. If sales levels are below the predicted level, the area may be able to support increased sales, either through the opening of new outlets targeting those leakages or a repositioning of existing outlets through changes in strategy and marketing, merchandise mix, or store configuration such that they could capture a portion of that leakage. A lower-than-predicted sales volume is a strong indicator that local consumers are buying goods outside the area; thus, the sales are “leaking” out of the area. Conversely, if the area shows more sales than would be expected from the area's characteristics, there are sales “injections” into the area. Often, an injection of sales indicates that the area is serving as the regional shopping destination for a broader area. On the other hand, if an area shows substantial leakage, it may be due to the presence of a region-serving retail node outside but near the area capturing those “leaked” sales. There are a number of factors that can be used to predict sales levels, with the two most important factors being the number of persons in the area and the disposable income available to that population. Additional factors influencing retail spending in an area include household type, age of population, number of workers in the area (i.e., daytime population), tourism expenditures, tenure patterns (owner vs. renter), and cultural factors. As noted above, Cupertino has overall per capita sales below county and statewide levels, while the RTA has overall per capita sales above those levels. This alone, however, does not indicate that the city is necessarily leaking sales to other locales, or that the RTA is capturing sales. For example, resident and worker shopping patterns may vary due to consumer preferences as well as the retail options available locally. Retail Sales in Cupertino and the RTA The estimated annual retail sales have been derived from Table 13 above, updated to 2013 estimates based on population growth, and are shown in Table 14 and Appendix C. Retail Demand from Residents To better determine the levels of leakages and injections for Cupertino and the RTA, this study used Nielsen Retail Market Potential Opportunity Gap (RMP) information for the two geographies and for Santa Clara County (to use for benchmarking purposes). This report estimates retail demand based on the Consumer Expenditure Survey, a national survey conducted for the Department of Labor Bureau of Labor Statistics by the U.S. Census Bureau which measures consumer expenditures and provides data on differing spending patterns by age, income, ethnicity, and other variables. This source information is converted to expected 1042 GENERAL PLAN AMENDMENT – MARKET STUDY 41 expenditures by store type, to obtain an estimate of demand by retail store category. BAE refined the RMP expenditure estimates based on actual expenditure patterns in Santa Clara County as reflected in total retail sales by major store category. The resulting per capita expenditure estimates are shown in Appendix C. Retail Demand from Workers In addition to the demand for retail goods generated by residents, persons working in a place also generate demand due to purchases near their place of work, especially meals eaten during the work day. When other shopping opportunities are also available nearby, workers often make other purchases during the day, or on the way to or from their job. Cupertino has a large employment base, with a net inflow of workers into the city, since there are more persons working in the city than working residents. Aside from this net inflow, worker expenditures are basically a wash; demand generated by workers living in the city is already accounted for in the resident demand estimate, and the expenditures of workers commuting into the city are balanced by the expenditures of those commuting out. However, the RTA shows a net outflow of workers, with less persons working in the area than working residents. This would indicate also a net outflow of retail expenditures, as RTA residents would be buying retail goods outside the area at a greater rate than the expenditures of the workers coming in. Appendix F presents an estimate of the potential worker expenditures near the place of work for the net inflow of workers into Cupertino and the RTA. This estimate is derived based on Office-Worker Retail Spending in the Digital Age, based on a national survey of office workers conducted in 2011 by the International Council of Shopping Centers, as shown in Appendix E. This survey gathered information on weekly expenditures, which have been converted to annual expenditures and inflated to 2013 dollars.13 Overall, the net potential worker expenditures for Cupertino are estimated at approximately $66 million annually. While this is a substantial number, the leakage analysis estimates potential resident expenditures of nearly $900 million annually. For the RTA, the net outflow of workers is estimated to result in an outflow of retail spending totaling approximately $78 million annually. Once again, this is a substantial number, but overall potential resident expenditures for the RTA are approximately $8.4 billion annually. 13 While not all workers in Cupertino are office-based, many are, and the use of this survey as a proxy for all workers is reasonable. While some workers may have lower incomes and thus lower expenditures (e.g., retail/service workers), Cupertino office workers likely have relatively high incomes so overall the expenditures may balance out. 1043 GENERAL PLAN AMENDMENT – MARKET STUDY 42 Once estimates of both resident and worker expenditures are combined, overall demand can then be compared to the estimated 2013 sales by major store category for Cupertino and the RTA. The results of this leakage analysis are summarized in Table 14, with detail on this analysis provided in Appendix C. Table 14: Summary of Leakage Analysis Cupertino 2013 Total Annual 2013Injection/ Retail Sales and Sales Potential in $000 Total Leakage EstimatedEstimatedEstimatedEstimatedInjection/as % of SalesResidentWorkerTotal Potential (Leakage)Potential Store Category in AreaExpendituresExpendituresExpenditures$000Sales Motor Vehicle and Parts Dealers$8,130$138,535$0$138,535 ($130,405)-94% Furniture and Home Furnishings Stores$14,228$21,031$0$21,031 ($6,803)-32% Electronics and Appliance Stores$14,228$48,657$4,700$53,357 ($39,130)-73% Bldg. Matrl. and Garden Equip. and Supplies$13,212$63,648$0$63,648 ($50,436)-79% Food and Beverage Stores$165,653$147,859$11,300$159,159$6,4944% Health and Personal Care Stores$34,553$40,941$4,000$44,941 ($10,388)-23% Gasoline Stations$52,847$54,756$0$54,756 ($1,909)-3% Clothing and Clothing Accessories Stores$40,651$81,772$6,000$87,772 ($47,121)-54% Sporting Goods, Hobby, Book, & Music Stores$16,260$23,440$1,800$25,240 ($8,980)-36% General Merchandise Stores$128,051$105,661$17,100$122,761$5,2904% Miscellaneous Store Retailers$2,033$20,672$5,800$26,472 ($24,439)-92% Food Services and Drinking Places$135,165$143,690$15,100$158,790 ($23,625)-15% Total$625,012$890,661$65,800$956,461 ($331,450)-35% Retail Trade Area 2013 Total Annual 2013Injection/ Retail Sales and Sales Potential in $000 Total Leakage EstimatedEstimatedEstimatedEstimatedInjection/as % of SalesResidentWorkerTotal Potential (Leakage)Potential Store Category in AreaExpendituresExpendituresExpenditures$000Sales Motor Vehicle and Parts Dealers$2,009,792$1,442,285$0$1,442,285$567,50739% Furniture and Home Furnishings Stores$183,822$194,905$0$194,905 ($11,083)-6% Electronics and Appliance Stores$484,066$448,170 ($5,600)$442,570$41,4959% Bldg. Matrl. and Garden Equip. and Supplies$584,147$592,208$0$592,208 ($8,061)-1% Food and Beverage Stores$1,537,981$1,450,188 ($13,400)$1,436,788$101,1937% Health and Personal Care Stores$420,749$405,514 ($4,700)$400,814$19,9355% Gasoline Stations$685,249$552,556$0$552,556$132,69324% Clothing and Clothing Accessories Stores$588,232$756,103 ($7,200)$748,903 ($160,671)-21% Sporting Goods, Hobby, Book, & Music Stores$320,668$215,083 ($2,200)$212,883$107,78551% General Merchandise Stores$888,475$1,006,780 ($20,300)$986,480 ($98,005)-10% Miscellaneous Store Retailers$242,033$201,196 ($6,900)$194,296$47,73725% Food Services and Drinking Places$1,332,713$1,375,340 ($18,000)$1,357,340 ($24,628)-2% Total $9,277,926$8,640,329 ($78,300)$8,562,029$715,8978% All sales and leakages are in 2013 dollars. For detail on methodology and sources, see Appendices D and I. Sources: BAE, based on sources as noted in Appendix D. 1044 GENERAL PLAN AMENDMENT – MARKET STUDY 43 Cupertino Leakage Analysis As indicated by low overall per capita sales levels, Cupertino shows leakages of sales in most major store categories, as shown in Figure 7. Leakages are especially high for motor vehicle and parts dealers. Only two major categories, food and beverage stores and general merchandise stores, have injections of sales; general merchandise stores and food and beverage stores both show sales at four percent above the levels predicted by the combined estimated expenditures of city residents and the net inflow of workers. The high leakages for the motor vehicle sector are directly related to the lack of new and used car dealers in Cupertino; the large cluster of auto dealers on Stevens Creek Boulevard in San Jose attracts shoppers from Cupertino and elsewhere, limiting the ability of Cupertino to capture more sales in this sector even if land were available to develop an auto retail mall/district. The injections of sales for general merchandise, where the sales are primarily derived from Target and the three Vallco Shopping Mall anchors, is an indicator that even though the center is somewhat dated and underperforming relative to more upscale traditional malls such as Valley Fair or Stanford Mall, the anchor stores still function as a regional draw pulling shoppers in from outside the city, even though much of the inline store space in the mall is vacant. The food and beverage store injections may result from the easy access and proximity to residents of other nearby cities for several of Cupertino’s major supermarkets, including both Ranch 99 stores and the Safeway currently being reconstructed; these stores are either on or very close to Cupertino’s borders and easily accessible to non-Cupertino residents. The other Asian-oriented food markets such as Marukai and Marina Foods may also act as regional draws. While the leakages of sales for motor vehicle-related retail stand out for their size, there are also very high leakages of estimated Cupertino resident sales in several other categories. Including the motor vehicle sector these categories cover stores selling what are commonly referred to as “comparison goods” which are goods that consumers do not purchase on a frequent (e.g., daily or weekly) basis, and for which consumers are more likely to compare price, quality, and features than they might for everyday items. The types of stores selling these goods often fit the definition of “destination” retail, where the decision to go to the store is based on a desire or need to spend more time shopping, and where the shopping “experience” is key and may involve an entertainment or dining component. Shoppers are often willing to travel a greater distance for this kind of shopping, at centers such as a mall, an outlet center, an upscale downtown area with a unique array of shops, or a large store such as a Bass Pro Outlet sporting goods store. The specific categories other than motor-vehicle-related retail showing leakages of 50 percent or greater are electronics and appliance stores; building materials and garden equipment and supplies stores, clothing and clothing accessories stores, and miscellaneous store retailers, a 1045 GENERAL PLAN AMENDMENT – MARKET STUDY 44 catch-all category that includes a variety of retail outlet types including florists, office supply stores, pet stores, and gift shops. The limited local sales in the building materials group are linked to the lack of a major home improvement store or hardware store such as Home Depot, Lowe’s, or Orchard Supply Hardware in the city (and the presence of a Home Depot just south of the city on South De Anza Boulevard in San Jose). There are also no major electronics or appliance stores such as Best Buy or Fry’s in Cupertino, although Sears (in the general merchandise store category) carries a large variety of appliances and may capture a larger share of resident expenditures that would otherwise occur in stores dedicated to electronics and appliances. The limited clothing and apparel-related store sales is due in part to the lack of destination retail centers in Cupertino, with the exception of the Vallco Shopping Mall. That center has suffered from competition with Valley Fair and other centers such that an entire level of the standalone smaller shops has been closed off, in turn limiting the ability of the center to reach a critical mass of shoppers necessary to support apparel retailers necessary to attract more shoppers. The lack of apparel-related retail may also lead to shoppers substituting purchases of clothing at the three large general merchandise stores in the city, which could lead to some of the calculated “injections” in that major retail store category. In summary, Cupertino has relatively strong sales in stores selling everyday items, such as food stores and drug stores. General merchandise stores, which sell a mix of everyday and comparison goods, are performing well due to the presence of three mall department stores and one discount department store. Stores specializing in other types of comparison goods, however, are lacking in the city; with the exception of the Vallco Shopping Mall, most of the retail in the city is for every day, convenience-oriented shopping. None of the shopping centers in Cupertino are “lifestyle” centers, representing the recent trend in retailing toward combining upscale retail, dining, and entertainment in one center, such as Santana Row nearby in San Jose, to create a more interesting shopping destination and experience. The Vallco Shopping Mall represents a mixed picture for Cupertino. Its anchor department stores and entertainment options appear to draw shoppers to the city, but the poor performance of the remainder of the mall contributes to Cupertino’s weakness in comparison goods shopping and destination retail. The degree to which Cupertino can increase sales in the categories evaluated in this section of the report will depend on the specific location and site characteristics and location of new retail development and general competitive forces (such as location of competitors). These issues are more fully developed and analyzed in the Retail Strategy Study. 1046 GENERAL PLAN AMENDMENT – MARKET STUDY 45 Figure 7: Cupertino Retail Sales Leakages by Major Retail Store Category Motor  Vehicle and Parts Dealers Bldg. Matrl. and Garden Equip. and Supplies Clothing and Clothing Accessories Stores Electronics and Appliance Stores Miscellaneous  Store Retailers Food Services and Drinking Places Health and Personal Care Stores Sporting Goods, Hobby, Book, & Music Stores Furniture and Home  Furnishings Stores Gasoline  Stations General  Merchandise  Stores Food and Beverage  Stores Annual Leakages/Injections Cupertino Retail Sales Leakages ←Leakages Injections → Motor Vehicle and Parts Dealers Miscellaneous  Store Retailers Bldg. Matrl. and Garden Equip. and Supplies Electronics and Appliance Stores Clothing and Clothing Accessories Stores Sporting Goods, Hobby, Book, & Music Stores Furniture  and Home  Furnishings Stores Health and Personal Care Stores Food Services and Drinking Places Gasoline  Stations Food and Beverage Stores General  Merchandise Stores Annual Leakages/Injections as % of Potential Sales Cupertino Leakages as % of Total  Potential Sales ←Leakages Injections → Source: BAE Urban Economics, based on Table 14; sources as noted in Appendix C and Appendix D. 1047 GENERAL PLAN AMENDMENT – MARKET STUDY 46 Retail Trade Area Leakage Analysis Unlike Cupertino, the larger RTA has limited leakages of retail sales (see Figure 8). The largest leakage by percent of total sales is for clothing and clothing accessory stores, with leakages of only 21 percent, in contrast to Cupertino where several major retail categories showed leakage of 30 percent or more of potential sales. Only one other category, general merchandise stores, shows substantial leakages (at 10 percent). The RTA shows injections of sales of 20 percent or greater for four categories: sporting goods, hobby, book and music stores; motor vehicle and parts dealers; gasoline stations; and miscellaneous store retailers. The RTA is not bounded by bodies of water or mountains except to the west, so these sectors are likely drawing additional shoppers from beyond the RTA boundaries. In particular, the concentration of motor vehicle dealers along Stevens Creek Boulevard in San Jose and Santa Clara is a major regional draw, leading to the high per capita sales injections for the RTA as well as the strong leakages from Cupertino itself, which has almost no motor-vehicle related retail. Overall, the strong sales in the RTA, where even sectors showing leakage have hundreds of millions of dollars in estimated sales, indicate a broad array of retail shopping options are available in nearby communities easily accessible to Cupertino residents. In turn, while the analysis shows that Cupertino residents are shopping outside the city itself, the strong regional retail environment constrains opportunities for additional capture of resident spending through new retail development in Cupertino. Notwithstanding the foregoing, the degree to which Cupertino can capture additional sales in the Retail Trade area will depend greatly on whether the Vallco Shopping Center can be repositioned or redeveloped to improve its performance in the Retail Trade Area. Strategies to reposition Vallco are identified and evaluated in the accompanying Retail Strategy Study. 1048 GENERAL PLAN AMENDMENT – MARKET STUDY 47 Figure 8: RTA Retail Sales Leakages by Major Retail Store Category Clothing and Clothing Accessories Stores General  Merchandise  Stores Food Services and Drinking Places Furniture and Home  Furnishings Stores Bldg. Matrl. and Garden Equip. and Supplies Health and Personal Care Stores Electronics and Appliance Stores Miscellaneous  Store Retailers Food and Beverage  Stores Sporting Goods, Hobby, Book, & Music Stores Gasoline  Stations Motor  Vehicle and Parts Dealers Annual Leakages/Injections Retail Trade Area Retail Sales Leakages ←Leakages Injections → Clothing and Clothing Accessories Stores General  Merchandise Stores Furniture and Home  Furnishings Stores Food Services and Drinking Places Bldg. Matrl. and Garden Equip. and Supplies Health and Personal Care Stores Food and Beverage  Stores Electronics and Appliance Stores Gasoline  Stations Miscellaneous  Store Retailers Motor Vehicle and Parts Dealers Sporting Goods, Hobby, Book, & Music Stores Annual Leakages/Injections as % of Potential Sales RTA Leakages as % of Total  Potential Sales ←Leakages Injections → Source: BAE Urban Economics, based on Table 14; sources as noted in Appendix C and Appendix D. 1049 GENERAL PLAN AMENDMENT – MARKET STUDY 48 Comparative Retail Sales by Detailed Store Category While the leakage analysis above provides key findings regarding the retail market in Cupertino and the RTA, the more detailed approach drills down to provide additional information on particular subcategories that may have weak or strong sales relative to the population base. The following analysis drills down to more detailed store types by NAICS14 code, by comparing annual per capita sales for Cupertino and the RTA with Santa Clara County overall. This analysis is not a more detailed version of the leakage analysis itself, but a slightly different type of analysis. This analysis includes no adjustments for local demographics (e.g., high incomes and home ownership) as provided by benchmarking based on the RMP report from Nielsen. The ability of consumers to substitute between store types and the quality of the RMP data do not reasonably allow per capita sales adjustment factors for these more detailed store types. The following analysis highlights (in bold typeface and boxes) a number of specific underperforming retail sectors in Cupertino, which may represent specific opportunities to expand retail in Cupertino and the RTA. As noted in the tables, some key specific store types with very low sales include motor vehicle dealers, electronics stores, computer and software stores, home improvement centers and hardware stores, apparel stores, and warehouse club stores. For the purposes of this discussion, per capita sales at less than 50 percent of countywide levels are defined as “very low.” Since the county has lower overall income levels and lower expected resident expenditures than either of the two study geographies, this is a strong indicator of subcategories where there is a substantial gap between sales and expenditures in the city and/or the RTA. The following discussion is organized by major retail category as shown in the leakage analysis above. Motor Vehicle and Parts Dealers. Cupertino has almost no motor-vehicle-related retail, and thus most resident expenditures are leaking out of the city. 15 However, the City does not have suitable sites for the major sales subcategory, new car dealers, so with the exception perhaps of an auto parts store, additional capture in this overall category in Cupertino is unlikely. The RTA shows generally strong sales for this grouping, especially for vehicle dealers, with the exception of RV dealers. This indicates that the larger RTA is well-served. 14 North American Industrial Classification System, a coding system providing a consistent framework for analyzing the economy and the different industries that are part of it. 15 The sources for these tables can be found in Appendix C and Appendix D. 1050 GENERAL PLAN AMENDMENT – MARKET STUDY 49 Table 15: Detail on Motor Vehicle Sector Sales Cupertino Retail Trade Area 2010 Estimated Annual Per Capita Sales in 2013 $Per CapitaAs %Per CapitaAs %Santa Clara Salesof CountySalesof CountyCounty New car dealers $00%$3,081167%$1,845 Used car dealers $00%$85222%$39 Recreational vehicle dealers $00%$00%$17 Motorcycle, ATV, and personal watercraft dealers $00%$4189%$47 Boat dealers $00%$11437%$3 All other motor vehicle dealers $00%$14288%$5 Automotive parts and accessories stores $00%$9881%$122 Tire dealers $123 137%$94 104%$90 Motor Vehicle and Parts Dealers $123 $3,425 $2,165 Furniture and Home Furnishings Stores. Despite leakage in this overall category, Cupertino shows strong sales in furniture stores, but has very low sales in the other subcategories, leading to the overall leakage in this major category. The only RTA subcategory with extremely low sales is window treatment stores, which make up a very small percentage of overall sales countywide. Table 16: Detail on Furniture and Home Furnishings Store Sales Cupertino Retail Trade Area 2010 Estimated Annual Per Capita Sales in 2013 $Per CapitaAs %Per CapitaAs %Santa Clara Salesof CountySalesof CountyCounty Furniture stores $164153%$117110%$107 Floor covering stores $00%$3085%$35 Window treatment stores $00%$19%$6 All other home furnishings stores $68 53%$165 129%$128 Furniture and Home Furnishings Stores $232 $313 $276 Electronics and Appliances Stores. Cupertino has very low sales in three of the four subcategories for electronics and appliance stores, including radio, television, and electronics stores, computer and software stores, and camera and photographic supplies stores. Table 17: Detail on Electronics and Appliances Store Sales Cupertino Retail Trade Area 2010 Estimated Annual Per Capita Sales in 2013 $Per CapitaAs %Per CapitaAs %Santa Clara Salesof CountySalesof CountyCounty Household appliance stores $94198%$49102%$47 Radio, television, and other electronics stores $8936%$254102%$249 Computer and software stores $278%$510144%$355 Camera and photographic supplies stores $0 0%$12 81%$15 Electronics and Appliance Stores $210 $825 $666 Building Materials, and Garden Equipment and Supplies. With the exception of the nursery, garden center, and farm supply subcategory, Cupertino has very limited sales in this category, with no estimated sales shown for home centers (e.g., Home Depot), paint and wallpaper stores, hardware stores (e.g., Orchard Supply Hardware), or outdoor power equipment stores. In contrast, per capita sales in the RTA for all subcategories is above countywide levels. 1051 GENERAL PLAN AMENDMENT – MARKET STUDY 50 Table 18: Detail on Building Materials Sector Sales Cupertino Retail Trade Area 2010 Estimated Annual Per Capita Sales in 2013 $Per CapitaAs %Per CapitaAs %Santa Clara Salesof CountySalesof CountyCounty Home centers $00%$365103%$355 Paint and wallpaper stores $00%$36165%$22 Hardware stores $00%$116110%$105 Other building material dealers $144%$385127%$303 Outdoor power equipment stores $00%$21194%$11 Nursery, garden center, and farm supply stores $208 441%$73 155%$47 Bldg. Matrl. and Garden Equip. and Supplies $222 $995 $844 Food and Beverage Stores. While Cupertino shows injection in this overall category, this is largely due to strong sales in supermarkets and other grocery (except convenience) stores, the subcategory that accounts for most of the sales in the overall food and beverage store sector. Cupertino, however, has very low or no sales in the meat markets, fish and seafood markets, and all other specialty food store subcategories. Per capita sales in meat markets and fish and seafood markets for the entire RTA are also very low. This indicates that despite overall injections of sales for the food and beverage store major sector, there may be opportunities for this category in some of these smaller market niches in Cupertino, which could perhaps also attract shoppers from elsewhere in the RTA. Table 19: Detail on Food and Beverage Store Sales Cupertino Retail Trade Area 2010 Estimated Annual Per Capita Sales in 2013 $Per CapitaAs %Per CapitaAs %Santa Clara Salesof CountySalesof CountyCounty Supermarkets and other grocery (except convenience) st $2,911145%$2,304114%$2,013 Convenience stores $87100%$102117%$87 Meat markets $00%$631%$18 Fish and seafood markets $00%$00%$3 Fruit and vegetable markets $46271%$40236%$17 Baked goods stores $44534%$10119%$8 Confectionery and nut stores $1084%$28228%$12 All other specialty food stores $219%$664%$9 Beer, wine, and liquor stores $95 92%$126 121%$104 Food and Beverage Stores $3,196 $2,620 $2,271 Health and Personal Care Stores. This category is dominated by pharmacies and drug stores, and shows modest leakages for Cupertino, which has few major chain pharmacies. The City has very low per capita sales relative to Santa Clara County for cosmetics, beauty supplies, and perfume stores, and food (health) supplement stores. For the RTA, where sales in the area are approximately in balance with demand, there are no subcategories with very low per capita sales relative to the county. 1052 GENERAL PLAN AMENDMENT – MARKET STUDY 51 Table 20: Detail on Health and Personal Care Store Sales Cupertino Retail Trade Area 2010 Estimated Annual Per Capita Sales in 2013 $Per CapitaAs %Per CapitaAs %Santa Clara Salesof CountySalesof CountyCounty Pharmacies and drug stores $41975%$54898%$559 Cosmetics, beauty supplies, and perfume stores $1219%$5688%$64 Optical goods stores $48160%$45153%$30 Food (health) supplement stores $1249%$2083%$25 All other health and personal care stores $22 74%$46 154%$30 Health and Personal Care Stores $513 $716 $707 Clothing and Clothing Accessories Stores. Overall, Cupertino has very weak per capita sales in this major retail category, and in most of its subcategories (see Table 21). The RTA, while showing some leakage overall for this category (see discussion above), has very low per capita sales only for clothing accessories stores, one of the smaller subcategories. The very low sales for Cupertino are an indicator that despite the fact that these kinds of stores are often found in shopping malls, the Vallco Shopping Mall is very weak in apparel-related sales. Table 21: Detail on Clothing and Clothing Accessory Store Sales Cupertino Retail Trade Area 2010 Estimated Annual Per Capita Sales in 2013 $Per CapitaAs %Per CapitaAs %Santa Clara Salesof CountySalesof CountyCounty Men's clothing stores $00%$1746%$36 Women's clothing stores $53%$165101%$163 Children's and infants' clothing stores $1431%$62141%$44 Family clothing stores $6514%$37178%$474 Clothing accessories stores $919%$2045%$45 Other clothing stores $94172%$69126%$55 Shoe stores $12177%$12178%$156 Jewelry stores $278256%$153141%$109 Luggage and leather goods stores $0 0%$25 169%$14 Clothing and Clothing Accessories Stores $585 $1,003 $1,097 Sporting Goods, Hobby, Book, and Music Stores. Among this group of store types, Cupertino only shows very low per capita sales for book stores, news dealers and newsstands, and prerecorded tape, compact disc, and record stores. These store type subcategories have all been impacted by online sales as well as e-readers, (e.g., Amazon, and iTunes) and thus do not represent long-term opportunities for recapture of sales in Cupertino. The RTA has no subcategories here with very low per capita sales, and in fact shows substantial sales injections for the overall category. 1053 GENERAL PLAN AMENDMENT – MARKET STUDY 52 Table 22: Detail on Sporting Goods, Hobby, Book, and Music Store Sales Cupertino Retail Trade Area 2010 Estimated Annual Per Capita Sales in 2013 $Per CapitaAs %Per CapitaAs %Santa Clara Salesof CountySalesof CountyCounty Sporting goods stores $8261%$276207%$134 Hobby, toy, and game stores $101163%$96156%$62 Sewing, needlework, and piece goods stores $56430%$44337%$13 Musical instrument and supplies stores $2697%$37139%$26 Book stores $1215%$7798%$78 News dealers and newsstands $00%$252%$4 Prerecorded tape, compact disc, and record stores $0 0%$15 223%$7 Sporting Goods, Hobby, Book, and Music Stores $276 $547 $323 General Merchandise Stores. Cupertino shows injections of sales in this major category, due to the three Vallco Shopping Mall anchor stores and the Target. Per capita sales by subcategory show the key role of the Vallco anchors, with extremely high per capita sales for the department stores (excluding discount department stores) subcategory. Cupertino shows no per capita sales in the warehouse clubs and supercenters subcategory, due to the lack of a Costco or similar store, and in the all other general merchandise stores subcategory, which includes miscellaneous types of variety stores and typically accounts for only a small portion of general merchandise stores overall. The RTA shows no subcategories with very low per capita sales. Table 23: Detail on General Merchandise Store Sales Cupertino Retail Trade Area 2010 Estimated Annual Per Capita Sales in 2013 $Per CapitaAs %Per CapitaAs %Santa Clara Salesof CountySalesof CountyCounty Department stores (except discount department stores)$1,488491%$443146%$303 Discount department stores $660113%$52790%$584 Warehouse clubs and supercenters $00%$47587%$546 All other general merchandise stores $0 0%$68 103%$66 General Merchandise Stores $2,148 $1,513 $1,499 Miscellaneous Store Retailers. Cupertino has very low per capita sales across most of the store type subcategories comprising this catch-all major category, which is reflected in the high leakage for the overall category. The exceptions are for pet and pet supply stores and tobacco stores. Many of these store types occupy narrow market niches with very limited sales. Table 24: Detail on Miscellaneous Retail Store Sales Cupertino Retail Trade Area 2010 Estimated Annual Per Capita Sales in 2013 $Per CapitaAs %Per CapitaAs %Santa Clara Salesof CountySalesof CountyCounty Florists $331%$18167%$11 Office supplies and stationery stores $00%$108153%$71 Gift, novelty, and souvenir stores $2040%$81160%$51 Used merchandise stores $38%$3576%$45 Pet and pet supplies stores $68117%$107184%$58 Art dealers $00%$129%$4 Manufactured (mobile) home dealers $00%$1993%$21 Tobacco stores $1061%$1481%$17 All other miscellaneous store retailers (except tobacc $5 13%$29 71%$40 Miscellaneous Store Retailers $111 $412 $317 1054 GENERAL PLAN AMENDMENT – MARKET STUDY 53 Food Services and Drinking Places. Cupertino’s sales in this major category are nearly in balance with estimated resident expenditures, and only one subcategory, food service contractors shows very low per capita sales. Full-service restaurants, which are responsible for the highest proportion of per capita sales countywide in the overall major category, have strong per capita sales in Cupertino. The RTA has no subcategories with very low per capita sales. Table 25: Detail on Food Services and Drinking Places Sales Cupertino Retail Trade Area 2010 Estimated Annual Per Capita Sales in 2013 $Per CapitaAs %Per CapitaAs %Santa Clara Salesof CountySalesof CountyCounty Full-service restaurants $1,456171%$942111%$849 Limited-service restaurants $47674%$692108%$641 Cafeterias, grill buffets, and buffets $29101%$31109%$29 Snack and nonalcoholic beverage bars $356201%$208117%$177 Food service contractors $3921%$314168%$187 Caterers $43138%$48157%$31 Mobile food services $3291%$2149%$1 Drinking places (alcoholic beverages)$3 8%$33 74%$44 Food Services and Drinking Places $2,405 $2,271 $1,959 The data presented above provide a basis for an estimate of potential market support for new retail development, which is presented in a subsequent section of this report. 1055 GENERAL PLAN AMENDMENT – MARKET STUDY 54 REAL ESTATE MARKET TRENDS This section provides an overview and analysis of current real estate market conditions in Cupertino, Santa Clara County, and the Bay Area. The overview presents data on the existing inventory, lease rates, and occupancy levels among residential, office, research and development (R&D), industrial, and retail properties. The information provided in the following sections was obtained from private data vendors, brokerage firm reports, and online property listings. These data sources are supplemented by quantitative and qualitative information on local real estate conditions obtained through interviews with local property managers and brokers. Each section on current real estate market conditions is followed by an overview of planned and proposed residential, office, R&D, retail, and mixed-use developments in Cupertino. The following section concludes with an evaluation of the total new square feet or units that would be supportable in Cupertino by 2020 and 2035. Residential Market Cupertino has a strong residential market, due largely to the high quality of the local school districts and the presence of Apple Inc. and other high-tech employers. High demand for homes and apartments in Cupertino has created a housing market characterized by high home sale and rental prices, which were impacted relatively mildly during the recent recession. Market Area. As discussed in a previous section, the school districts that serve Cupertino (the Cupertino Union School District and the Fremont Union High School District) are considered among the best in California, which leads to high demand for housing in these districts among families with school-aged children. Interviews with residential real estate brokers in Cupertino confirm the positive role local public schools have in supporting the housing market. Since the schools are a significant factor in attracting residential demand, Cupertino is in a market area that is largely defined by the boundaries of these school districts, which include portions of Sunnyvale, Los Altos, Saratoga, Santa Clara, and west San Jose. In addition to the high-quality school districts, Cupertino’s proximity to high-tech employment contributes to the high demand for housing in the city. Apple Inc. is a primary factor in attracting residents that are seeking homes near high-tech employment centers to Cupertino, and other large and small tech companies in neighboring communities lead to additional residential demand in and around Cupertino. Existing Inventory and Recent Construction Existing Inventory. Compared to Santa Clara County and the Bay Area, Cupertino has a larger share of single-family homes and a smaller share of multi-family housing. According to ACS data, 70 percent of housing units in Cupertino were single family homes (both detached and attached) and 30 percent were multifamily units, while the proportion of multifamily units was 33 percent in Santa Clara County and 35 percent throughout the Bay Area. Multifamily housing in 1056 GENERAL PLAN AMENDMENT – MARKET STUDY 55 Cupertino is most commonly provided in small buildings containing three to 19 units, which accounted for 17 percent of the Cupertino housing stock. Table 26: Housing Units by Type of Structure (a) Santa Clara Type of Residence CupertinoCountyBay Area (b) Single Family Detached 56.1%53.6%53.4% Single Family Attached 13.6%10.1%9.1% Multifamily 2 Units 1.7%1.9%3.8% Multifamily 3-19 Units 16.7%16.8%18.0% Multifamily 20-49 Units 2.1%5.2%5.6% Multifamily 50+9.4%9.3%8.1% Mobile Home/Other (c)0.3%3.1%2.1% Total 100.0%100.0%100.0% Single Family Housing Units69.7%63.8%62.5% Multifamily Housing Units 30.0%33.2%35.4% Notes: (a) The American Community Survey (ACS) publishes demographic estimates based on statistical sampling conducted between 2009-2011. (b) The nine-county Bay Area includes Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, and Sonoma counties. (c) Includes standard mobile homes as well as boats, RVs, vans, and other vehicles that serve as a primary residence. Sources: ACS, 2009-2011; BAE, 2013. Tenure. Cupertino has a slightly higher proportion of owner-occupied households than Santa Clara County and the Bay Area. In 2010, 63 percent of all Cupertino households were owner- occupied, compared to 58 percent of Santa Clara County households and 56 percent of Bay Area households. In all three geographies, the proportion of renter-occupied units increased slightly (one to two percentage points) between 2000 and 2010. 1057 GENERAL PLAN AMENDMENT – MARKET STUDY 56 Table 27: Household Tenure, 2000-2010 2000 2010 Cupertino NumberPercentNumberPercent Owners 11,58363.6%12,62762.6% Renters 6,621 36.4%7,554 37.4% Total 18,204100.0%20,181100.0% Santa Clara County Owners 338,66159.8%348,29857.6% Renters 227,202 40.2%255,906 42.4% Total 565,863100.0%604,204100.0% Bay Area (a) Owners 1,423,95857.7%1,465,36256.2% Renters 1,042,061 42.3%1,142,661 43.8% Total 2,466,019100.0%2,608,023100.0% Notes: (a) The nine-county Bay Area includes Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, and Sonoma counties. Sources: U.S. Census 2000 & 2010; BAE, 2013. Recent Construction Trends. Residential building permit data provided by the U.S. Census Bureau demonstrate that both Cupertino and Santa Clara County experienced a decline in building permit activity in 2009 –the bottom of the Great Recession—followed by a moderate recovery in the subsequent three years. (See Figure 9). In Cupertino, 2006 was the most active year in the past decade with respect to residential building permits, with a total of 126 permits issued. Building permit activity remained strong through 2008, then decreased to 21 units in 2009 as building activity decreased during the recession. Building permit activity increased during 2011 and 2012, but nonetheless lagged pre-recession levels. Figure 9: Residential Units Permitted, 2003-2012 Source: US Census Building Permit Data, 2013; BAE, 2013. 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 0 20 40 60 80 100 120 140 2003200420052006200720082009201020112012 Un i t s P e r m i t t e d i n S a n t a C l a r a Co u n t y Un i t s P e r m i t t e d i n C u p e r t i n o Cupertino Santa Clara County 1058 GENERAL PLAN AMENDMENT – MARKET STUDY 57 Residential building permits issued in Cupertino over the past decade have overwhelmingly consisted of permits for single family homes, as indicated in Figure 10. Between 2003 and 2012, 87 percent of all residential units permitted in Cupertino were single family units, and seven percent were in buildings with five or more units. Compared to the composition of the existing housing stock shown in Table 26, this represents a higher concentration of single-family units in Cupertino over time. During the same period, 36 percent of residential units permitted throughout Santa Clara County were for single family homes while 62 percent of units permitted were in buildings with five or more units, which represents a smaller concentration of single- family units in the county over time. Figure 10: Residential Units Permitted by Building Type, 2003-2012 Source: US Census Building Permit Data, 2013; BAE, 2013. 87% 36% 6% 1%0%2% 7% 62% 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0% 90.0% 100.0% CupertinoSanta Clara County Pe r c e n t o f U n i t s P e r m i t t e d Single Family Two Family Three and Four Family Five or More Family For Sale Residential Home Price Trends. According to home sale data provided by DataQuick, which collects data from the County Assessor (shown in Figure 11 below), home sale prices in Cupertino are typically higher than prices in Santa Clara County overall, and were impacted mildly during the recent economic downturn. Median home prices dropped only 8 percent in Cupertino between 2008 and 2010 compared to 35 percent for Santa Clara County between 2007 and 2009. The median price for Cupertino changed very little between 2009 and 2011, but increased significantly in 2012 to $1,045,750, higher than pre-recession levels and twice as high as the median for the county. 1059 GENERAL PLAN AMENDMENT – MARKET STUDY 58 Figure 11: Median Home Sale Price, 2005-2012 Location Median Sale Price 2005 2006 2007 2008 2009 2010 2011 2012 Cupertino $908,000$935,000$939,500$1,012,500$930,000$931,000$933,000$1,045,750 Santa Clara County$660,000$680,000$700,000$580,000$455,000$500,000$472,500$525,000 Source: Dataquick; BAE, 2013. $0 $200,000 $400,000 $600,000 $800,000 $1,000,000 $1,200,000 20052006200720082009201020112012 Cupertino Santa Clara County Data on recent home sales in Cupertino further demonstrate that the housing market is characterized by high home sale prices, with virtually no low- or moderately-priced options. Table 28 shows the sale price distribution for single-family homes and condominiums sold in Cupertino between March 1, 2013 and August 31, 2013. Among single-family homes sold during this period, 88 percent sold for $1,000,000 or more, with a median price of $1,431,500. The median price of condominiums sold during this period was $775,000, and more than half of all condominiums had a sale price between $700,000 and $1,000,000. As discussed above, these median housing costs exceed the affordability threshold for people earning the median income for a person employed in Cupertino, particularly for single-person households or household with only one income earner. The data presented in Table 28 also indicate that the for-sale residential market in Cupertino consists of relatively large units. Among homes recently sold, more than half of all single family homes had four or more bedrooms. Although condominiums tended to be smaller than single family homes, 90 percent had two or more bedrooms. The large size and high price of residential units in Cupertino indicate that the for-sale market primarily serves larger high- income households, and that there is a potential unmet need for smaller, more affordable units to provide housing options for individuals and small households in the local workforce. 1060 GENERAL PLAN AMENDMENT – MARKET STUDY 59 Table 28: Sale Price Distribution of Single-Family Residences and Condominiums by Number of Bedrooms, March-August 2013 (a) Number of Units Sold Sale Price Range1 BRs2 BRs3 BRs4+ BRsTotal% Total Single-Family Residences Less than $500,0000 01231.7% $500,000-$999,999151201810.1% $1,000,000-$1,499,9991445267642.7% $1,500,000-$1,999,9990113466033.7% $200,000 or more0 0 4 17 21 11.8% Total 2 10 75 91178100.0% % Total 1.1%5.6%42.1%51.1%100.0% Median Sale Price$970,000$987,500$1,291,000$1,599,000$1,431,500 Average Sale Price$970,000$1,068,977$1,319,015$1,644,659$1,467,527 Average Size (sf)8221043159724561996 Average Price/sf $1,180$1,025$826$670$735 Condominiums Less than $400,000 0 11022.4% $400,000-$699,999 8 8 0 0 1619.3% $700,000- $999,999 0 39 6 0 4554.2% $1,000,000-$1,299,999 0 5 11 3 1922.9% $1,300,000 or more 0 1 0 0 1 1.2% Total 8 54 18 3 83100.0% % Total 9.6%30.3%10.1%1.7%46.6% Median Sale Price$539,500$747,500$1,037,500$1,150,000$775,000 Average Sale Price$535,625$781,778$977,833$1,108,333$812,373 Average Size (sf)8921291183519081393 Average Price/sf $600$606$533$581$583 Notes: (a) Consists of all full and verified sales of single-family residences and condominiums in the 94014 ZIP code between 3/1/2013 and 08/31/2013. Sources: DataQuick, BAE; 2013. Planned and Proposed For-Sale Projects. There are two for-sale residential projects in the development pipeline in Cupertino: Parkside Trails, which would consist of 18 single family homes on Stevens Canyon Road south of Ricardo Road and a six-unit live/work project on Foothill Boulevard and Silver Oak Way16. Under the proposed Parkside Trails plan, the new residential development would take place on nine acres of the site and an additional 33.5 acres adjacent to the residential development would be dedicated as open space. The plan is currently under review by the City. The project on Foothill Boulevard is on a small infill parcel formerly occupied by an automotive service station. 16 As of the date of this report, this project has not been approved. 1061 GENERAL PLAN AMENDMENT – MARKET STUDY 60 Rental Residential Existing Rental Inventory. Similar to the for-sale market, the rental residential market in Cupertino consists of relatively large units. Figure 12 shows data provided by RealFacts, which collects data on rental properties with 50 units or more. As shown, 59 percent of units in Cupertino had two or more bedrooms, compared to 49 percent in Santa Clara County overall. Figure 12: Rental Stock by Number of Bedrooms, Second Quarter 2013 (a) Note: (a) Data captures rental housing complexes with at least 50 units in Cupertino and Santa Clara County. Unit types comprising less than 0.1 percent of the units in the sample were omitted from the figure. Sources: RealFacts; BAE, 2013. 6.3% 45.0%44.3% 4.4%3.0% 38.1% 52.6% 6.3% 0% 10% 20% 30% 40% 50% 60% StudiosOne-Bedroom UnitsTwo-Bedroom UnitsThree-Bedroom Units Pe r c e n t o f U n i t s i n S a m p l e Cupertino Santa Clara County Occupancy and Rental Rate Trends. Occupancy and rental rate trends between 2005 and 2013 demonstrate that Santa Clara County has a strong rental market, particularly in Cupertino. As shown in Figure 13, rental rates in the City and county decreased in 2009 following steady increases between 2005 and 2008. However, rents increased significantly in 2011, surpassing pre-recession levels, and further increased through the second quarter of 2013. Throughout this nine-year time period, the average monthly rent in Cupertino remained approximately $250 to $425 higher than the average for Santa Clara County. As of the second quarter of 2013, the average monthly rent was $2,426 in Cupertino and $2,062 in Santa Clara County. The shortage of young adult residents and workers in Cupertino could be largely the result of the lack of moderately priced housing options for many young or single-earner households, which suggests a need for smaller, more affordable units that can serve as workforce housing. 1062 GENERAL PLAN AMENDMENT – MARKET STUDY 61 Figure 13: Rental Rate Trends, 2005-2013 Note: (a) Data captures rental housing complexes with at least 50 units in Cupertino and Santa Clara County. Sources: RealFacts; BAE, 2013. $0 $500 $1,000 $1,500 $2,000 $2,500 $3,000 200520062007200820092010201120122013 Av e r a g e M o n t l y R e n t Cupertino Santa Clara County Occupancy rates in Santa Clara County and Cupertino further demonstrate solid demand for housing in Cupertino. Housing markets are typically considered to have a healthy amount of vacancy when units are 95 percent occupied, which allows for some mobility between rental units. As shown in Figure 14, the rental occupancy rate in Cupertino was on average 95.3 percent occupied over the past eight years. During the Great Recession Cupertino’s occupancy rate decreased to 93 percent. In Santa Clara County, the vacancy rate did not fall below 95 percent in any year between 2005 and 2013, and was higher in many years during this period. Figure 14: Vacancy Rate Trends, 2005-2013 90.0% 91.0% 92.0% 93.0% 94.0% 95.0% 96.0% 97.0% 98.0% 99.0% 100.0% 200520062007200820092010201120122013 Oc c u p a n c y R a t e Cupertino Santa Clara County1063 GENERAL PLAN AMENDMENT – MARKET STUDY 62 Planned and Proposed Rental Projects. There are three rental residential projects in the development pipeline in Cupertino, totaling 404 new residential units, all in mixed-use developments. The largest of the three projects is the Rose Bowl mixed-use development, which is currently under construction and will consist of approximately 60,000 square feet of retail and 204 rental residential units east of the Vallco shopping center. Also under construction is the Biltmore Adjacency, a mixed-use project which will consist of 80 rental residential units and 7,000 square feet of retail on Steven Creek Boulevard at North Blaney Avenue. The project included demolition of 21,000 square feet of retail space, resulting in a net loss of retail space on the site. The third project with rental residential units in the pipeline is Main Street Cupertino, which will consist of 120 rental residential units, 130,500 square feet of retail space, 260,000 square feet of office space, and 180 hotel rooms on Steven Creek Boulevard between Finch Avenue and Tantau Avenue. Main Street Cupertino has been approved but is not yet under construction. Office Real Estate Market Overview Market Context. As discussed above, Cupertino is a significant employment node, due largely to the strong presence of Apple Inc. in the city. Apple Inc. currently occupies a significant portion of the office space in Cupertino in addition to the company’s existing campus. The company has received City approvals to construct a second campus in Cupertino (Apple Campus 2). It is not known whether the company will retain all of the space that it currently occupies once the new campus is complete. However, Apple has indicated that the new campus is intended to accommodate additional employees rather than to replace the space that the company is currently using. Office brokers familiar with the local market report that Apple’s presence in Cupertino also leads other companies to seek out office space in the City because Apple often requires the companies that it works with to have a local satellite office. In addition to Apple and the companies associated with it, there is high demand for office space in Cupertino among high-tech companies and companies that offer professional services to the high-tech industry. The office market in Santa Clara County consists of a number of submarkets with varying demand for office space, which is generally reflected in vacancy, lease, and absorption rates. Palo Alto is typically considered to be the top tier in the Santa Clara County office market supporting the highest rents and lowest vacancies. The West Valley submarket, which includes the cities of Campbell, Cupertino, Santa Clara, Sunnyvale, and parts of west San Jose has traditionally been highly desirable due to the location of executive-level residential areas in Los Altos, Los Altos Hills, Lost Gatos, Monte Sereno and Cupertino. Convergence of Office and R&D Space Requirements. Traditionally, there has been a distinction in the real estate market between office and R&D space, with R&D space typically in single-story rectangular or square-shaped structures with modest exterior features and detailing. However, over time there has been an increasing convergence of these real estate product types across the Bay Area as production facilities have moved elsewhere, often to other 1064 GENERAL PLAN AMENDMENT – MARKET STUDY 63 countries, and research and product development activities that once required large or specialized lab space are more often completed using computer simulations. Future real estate demand in Cupertino, Santa Clara County, and the Bay Area is expected to reflect a diminished distinction between office and R&D space requirements, with office space used to conduct tasks that have formerly required larger R&D spaces. Demand for State-of-the-Art, Green Office Space. There has been a notable increase in the number of office property owners and developers renovating or developing their office space into LEED certified structures, usually at the silver, gold, or platinum levels. Two factors drive this increase in interest in sustainable office space: (i) implementing design and building system features that qualify a structure for LEED certification can result in significant operational savings of the life of the building; and (ii) building users and tenants can market their “green” office space as a positive feature to attract employees. Younger workers, particularly in the technology sectors, seek to work for companies whose values generally align with their own and environmental sustainability is one element of these values. Demand for Building, Site and Neighborhood Amenities. Office workers, particularly workers in the high-tech industries that dominate the market in Cupertino and elsewhere in Silicon Valley, are increasingly demonstrating a preference for workplace locations that offer the amenities typically found in more urban environments, including proximity to public transportation, bicycle and pedestrian access, attractive retail offerings, and entertainment options. In response to this shift in preferences among workers, companies are more often seeking office locations that offer more urban-style amenities instead of opting for traditional suburban office parks. The preference for more urban amenities, particularly access to public transportation, is reflected in the preferences of companies looking for space in Silicon Valley. Commercial brokers familiar with Cupertino have reported that the city’s lack of access to Caltrain has deterred some companies from locating in Cupertino, and that some employers have chosen to locate in Sunnyvale rather than Cupertino in order to have access to Caltrain. Higher Employment Densities in Office Space. Since the recovery from the Great Recession, office end users and technology tenants have begun to seek office space with open floor plans to both encourage interaction among employees as well as accommodate more employees in their office space to reduce real estate costs. As a result, owners of existing properties have had to open up their building interiors as part of building renovation programming. This trend has also led to increased employment densities with the gross square feet of office per employees falling from 275 or 250 square feet per employee to 225 to 250 per employee. In some cases, this ratio has reached 200 square feet per employee. For this study, BAE uses a 250 square foot per employee factor for office demand calculations. Response by Silicon Valley Communities. Cities in Silicon Valley and elsewhere have started to consider and implement strategies to reposition existing office parks and other suburban office locations to better respond to these trends and shifts in demand. In general, these strategies aim to better integrate suburban office development into the surrounding area 1065 GENERAL PLAN AMENDMENT – MARKET STUDY 64 through mixed-use development and the addition of public spaces, bicycle paths, and pedestrian networks. Elements of a repositioning strategy can also include the construction of additional housing, particularly housing affordable to local workers, and expanding the mix of retail and entertainment options. Implementation of some or all of these strategies may be necessary for Cupertino to continue to capture a significant portion of future employment growth. Inventory and Absorption Trends. Silicon Valley is a strong employment node with a large inventory of office space. According to data from commercial brokerage Cassidy/Turley, there were approximately 61 million square feet of office space in Santa Clara County as of the first quarter of 2013. The office inventory in Cupertino totaled approximately 4.1 million square feet, one fifth of the West Valley office inventory (20.3 million square feet). Existing office development in Cupertino is distributed primarily along Stevens Creek Boulevard, De Anza Boulevard, and North Wolfe Road. A large office site north of Interstate 280 at North Wolfe Road is located on the site of the proposed new Apple campus and would be demolished to construct the new campus. The amount of office space in Cupertino has been essentially unchanged over the past decade, according to data from Cassidy Turley. As shown in Figure 15, Cupertino had approximately 4 million square feet of office space in 2003, and there have been only minor fluctuations through the first quarter of 2013. Meanwhile, there were modest increases in the office inventory in the West Valley submarket (from 15.7 million square feet in the first quarter of 2003 to 20.3 million square feet in the first quarter of 2013) and in Santa Clara County overall (from 53.6 million square feet in the first quarter of 2003 to 61.0 million square feet in the first quarter of 2013). Figure 15: Office Inventory, 2003-2013 Note: The West Valley submarket defined for this figure consists of Campbell, Cupertino, Santa Clara, and Sunnyvale. Sources: Cassidy/Turley, 2013; BAE, 2013. 0 10,000,000 20,000,000 30,000,000 40,000,000 50,000,000 60,000,000 70,000,000 Q1 2003Q1 2004Q1 2005Q1 2006Q1 2007Q1 2008Q1 2009Q1 2010Q1 2011Q1 2012Q1 2013 Of f i c e I n v e n t o r y ( s q . f t . ) Cupertino West Valley (a)Santa Clara County 1066 GENERAL PLAN AMENDMENT – MARKET STUDY 65 In the real estate market, gross absorption measures the total square feet space leased over a defined time period, while net absorption measures the total square feet of space leased over a defined time period after subtracting the amount of existing space vacated or new space added to the inventory during the same period. Net office absorption in Cupertino and the West Valley submarket has varied substantially over the past two business cycles. Figure 16 and Figure 17 show net annual absorption in Cupertino and the West Valley submarket between 2003 and 2012. As shown, net annual absorption in Cupertino ranged from -169,110 square feet in 2008 to 213,336 square feet in 2004. Net annual absorption in the West Valley submarket ranged from -482,011 square feet in 2009 to almost 2.2 million square feet in 2012. Despite some years with considerable amounts negative net absorption, both Cupertino and the West Valley submarket showed positive average net annual absorption over time. Annual net absorption between 2003 and 2012 averaged approximately 60,500 square feet per year in Cupertino and approximately 565,400 square feet per year in the West Valley submarket overall, demonstrating long-term growth. Figure 16: Annual Net Office Absorption, Cupertino, 2003-2012 Sources: Cassidy/Turley, 2013; BAE, 2013. (75,138) 213,336 (17,079) 192,093 56,144 (169,110) 9,272 163,014 148,985 83,242 60,476 -200,000 -150,000 -100,000 -50,000 0 50,000 100,000 150,000 200,000 250,000 2003200420052006200720082009201020112012Annual Average 2003-2012 Ne t O f f i c e A b s o r p t i o n ( s q . f t . ) 1067 GENERAL PLAN AMENDMENT – MARKET STUDY 66 Figure 17: Annual Net Office Absorption, West Valley, 2003-2012 Note: The West Valley submarket defined for this figure consists of Campbell, Cupertino, Santa Clara, and Sunnyvale. Sources: Cassidy/Turley, 2013; BAE, 2013. 54,144 586,451 683,979 558,066 (31,393) (301,192) (482,011) 732,985 1,662,962 2,189,985 565,398 -1,000,000 -500,000 0 500,000 1,000,000 1,500,000 2,000,000 2,500,000 2003200420052006200720082009201020112012Annual Average 2003-2012 Ne t O f f i c e A b s o r p t i o n ( s q . f t . ) Vacancy and Rental Rate Trends. Similar to net absorption, lease and vacancy rates in Cupertino, the West Valley submarket, and Santa Clara County have demonstrated a significant amount of variation over two business cycles between 2003 and 2013. However, the Cupertino office market has performed strongly over this time period relative to the West Valley submarket and Santa Clara County overall. Figure 18 shows first quarter average Class A full service office lease rates for Cupertino, the West Valley submarket, and Santa Clara County, and Figure 19 shows average office vacancy rates for Cupertino, the West Valley submarket, and Santa Clara County, according to data provided by Cassidy/Turley. As shown, lease rates for Class A office space in Cupertino are typically higher than Class A lease rates in the West Valley submarket or Santa Clara County overall. The average Class A lease rate in all three geographies peaked in 2008, with first quarter lease rates averaging $3.94 per square foot per month in Cupertino, $3.56 per square foot per month in the West Valley submarket, and $3.49 per square foot per month in Santa Clara County. Class A lease rates have decreased slightly in subsequent years, though averages have remained higher than $3.00 per square foot per month in the city, submarket, and county. As of the first quarter of 2013, the average full service Class A office lease rates in Cupertino was slightly lower than rates in the submarket and county at $3.15 per square foot per month. However, trends over time suggest that Class A properties in Cupertino typically rent for higher rates than average for the submarket and county. 1068 GENERAL PLAN AMENDMENT – MARKET STUDY 67 Figure 18: Class A Office Lease Rates, First Quarter 2003 to First Quarter 2013 Note: (a) The West Valley submarket defined for this figure consists of Campbell, Cupertino, Santa Clara, and Sunnyvale. Sources: Cassidy/Turley, 2013; BAE, 2013. $0.00 $0.50 $1.00 $1.50 $2.00 $2.50 $3.00 $3.50 $4.00 $4.50 Q1 2003Q1 2004Q1 2005Q1 2006Q1 2007Q1 2008Q1 2009Q1 2010Q1 2011Q1 2012Q1 2013 Av e r a g e C l a s s A F u l l S e r v i c e Le a s e R a t e ( p e r s q . f t . / m o ) Cupertino West Valley (a)Santa Clara County Although first quarter office vacancy rates fluctuated substantially in Cupertino between 2003 and 2013, with a high of 17.0 percent in 2010 and a low of 1.5 percent in 2013, the vacancy rate in Cupertino has consistently been lower than vacancy rates in the West Valley submarket and Santa Clara County overall. The low vacancy rate in the first quarter of 2013, coupled with trends demonstrating the low vacancy rate in Cupertino relative to other markets, indicates high demand for Cupertino office space in the short term and over time. Figure 19: Office Vacancy Rates, First Quarter 2003 to First Quarter 2013 Note: (a) The West Valley submarket defined for this figure consists of Campbell, Cupertino, Santa Clara, and Sunnyvale. Sources: Cassidy/Turley, 2013; BAE, 2013. 0% 5% 10% 15% 20% 25% 30% Q1 2003Q1 2004Q1 2005Q1 2006Q1 2007Q1 2008Q1 2009Q1 2010Q1 2011Q1 2012Q1 2013 Of f i c e V a c a n c y R a t e Cupertino West Valley (a)Santa Clara County According to office brokers familiar with Cupertino, the city’s low office vacancy rate, shortage of large office spaces available for rent, and high office lease rates prevent many businesses from locating in Cupertino and often cause small companies to leave the City in order to 1069 GENERAL PLAN AMENDMENT – MARKET STUDY 68 expand. Cupertino City Center, which is considered by local brokers to be the city’s premier office building, has been 100 percent occupied for over a year. It now has one 8,200-square foot space available and will have two additional small spaces becoming available over the next six months, but these spaces are expected to fill quickly. Rents at Cupertino City Center are $4.00 per square foot per month, triple net, or approximately $5.00 per square foot on a full service basis. The Cupertino Financial Center, which local brokers consider to be the most prestigious building in the City apart from Cupertino City Center, has less than 1,000 square feet available for rent at $4.50 per square foot per month, full service. Asking rents for other spaces on the market range from approximately $2.00 to $3.50 per square foot per month on a full service basis. There are no available office spaces in Cupertino larger than 8,200 square feet and it is reported that there have been no vacancies larger than 10,000 square feet in the City for at least a year. An inventory of currently leasing office properties in Cupertino is shown in Appendix G- 1. Planned and Proposed Office Development. As shown in Appendix H-1, there are four office developments in the project pipeline in Cupertino, which would add one million net new square feet (3.8 million gross new square feet) of office space to the city. The largest development in the project pipeline is the 3.4 million square foot Apple Campus 2 project, which was approved in October 2013 and is currently under building permit review. The project is planned in two phases, the first consisting of 2.8 million square feet of office space in a four-story building, a 1,000-seat auditorium, a fitness center, and parking structures. The second phase would include 600,000 additional square feet of office and research facilities. According to the Economic and Fiscal Impact study for the campus, prepared by Keyser Marston Associates in May 2013, the campus would have a total capacity of 14,200 employees. The plans call for demolition of 2.65 million square feet of office space, resulting in a net increase of 750,000 square feet of office space resulting from the project. The remaining three office developments in the project pipeline consist of an estimated 294,000 square feet of net new office space which would expand the city’s existing inventory by approximately 7.4 percent. The majority of this space would be in Main Street Cupertino, a mixed-use development that includes 260,000 square feet of office space, 130,500 square feet of retail space, 180 hotel rooms, and 120 residential units. Additional office space has been planned in the Oaks Shopping Center project, a mixed-use development with a four-story, 122- room hotel and a three-story, 56,000-square foot retail, office, and convention center building. The plans for the Oaks Shopping Center call for demolition of 2,430 square feet of retail space and 15,263 square feet of movie theater space. This study estimates that the 56,000 square feet of commercial space in the Oaks Shopping Center project would be divided evenly between retail, office, and convention center, with almost 19,000 square feet for each use. The remaining office square footage consists of demolition of five office buildings totaling 140,000 square feet at One Results Way and construction of 155,000 square feet of office space in three two-story buildings along with a two-story parking garage. All three projects have received the necessary entitlements but are not yet under construction. It should be noted that the Oaks Shopping 1070 GENERAL PLAN AMENDMENT – MARKET STUDY 69 Center project was approved in September 2008, and its entitlement will expire in September 2014 unless building permits are approved. Retail Real Estate Market Overview The data presented here and in the Retail Sales and Leakage Analysis are also used as foundational information for the separate Retail Strategy Report prepared by Greensfelder Commercial Real Estate. Retail Market Context. Santa Clara County provides a relatively robust retail sector, with several regional malls, lifestyle centers, and other types of destination retail along with community-serving retail options. Terranomics, which collects data on shopping centers of 50,000 square feet or more, reports that the retail inventory in Santa Clara County totaled approximately 38 million square feet in the fourth quarter of 2012. This represents 31 percent of the Bay Area retail inventory, while only 25 percent of the region’s population and 23 percent of its households lived in Santa Clara County as of the 2010 US Census. Retail development in Cupertino is somewhat dispersed along Stevens Creek Boulevard, De Anza Boulevard, and Wolfe Road, which constitute the primary commercial corridors in Cupertino. The Vallco Shopping Center, on North Wolfe Road and Stevens Creek Boulevard, is the largest retail node in the city, and is one of the study areas for the GPA. Although Vallco is a regional mall, it has experienced high vacancy in its in-line shop space in recent years and is not able to compete with newer destination retail centers in neighboring cities, particularly Valley Fair shopping center in Santa Clara and lifestyle centers such as Santana Row in San Jose17. The remaining retail space in Cupertino consists primarily of neighborhood and community- serving retail centers. Along Stevens Creek Boulevard, retail options include the Oaks Shopping Center, Cupertino Crossroads Shopping Center, a stand-alone Whole Foods store, and a retail cluster that includes a Target store. As discussed in the section above, there is an approved development plan for the site of the Oaks Shopping Center that would demolish the existing movie theater and a portion of the existing retail space on site to construct a new retail, office, and convention center space and a 122-room hotel. There are several additional community-serving shopping centers on De Anza Boulevard and North Wolfe Road, including two Ranch 99 supermarkets. The Cupertino Village shopping center, which is north of Interstate 280 on North Wolfe Road, is also one of the study areas for the GPA. Inventory and Absorption Trends. Similar to the inventory of office space, the amount of retail space in Cupertino has not changed substantially in recent years, according to data from 17 A full description of the Vallco Shopping Center and strategies to redevelop and revitalize this shopping facility is presented in the Retail Strategy Study. 1071 GENERAL PLAN AMENDMENT – MARKET STUDY 70 commercial brokerage Terranomics, which tracks shopping centers measuring 50,000 square feet or more. Terranomics combines Cupertino and Sunnyvale in to a single submarket for data reporting purposes. As shown in Figure 20, Cupertino and Sunnyvale had approximately 4.2 million square feet of retail space in 2006, which increased modestly to 4.4 million square feet by the second quarter of 2013, an increase generally consistent with the increase in retail inventory experienced by Santa Clara County (growing from 35.6 million square feet in 2006 to 38.0 million square feet in the second quarter of 2013). Figure 20: Retail Inventory, 2006-2013 (Year to Date) (a) Notes: (a) Data are for shopping centers with 50,000 square feet or more. (b) Year-to-date data are through the second quarter of 2013. Sources: Terranomics, 2013; BAE, 2013. 0 5,000,000 10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 2006200720082009201020112012YTD 2013 (b) Sh o p p i n g C e n t e r In v e n t o r y ( s q . f t . ) Cupertino/Sunnyvale Santa Clara County With the exception of a couple years directly following the 2008 real estate market crash and Great Recession, net annual retail absorption in Cupertino/Sunnyvale and Santa Clara County was generally positive between 2006 and 2013. Figure 21 and Figure 22 show net annual absorption in Cupertino/Sunnyvale and Santa Clara County between 2006 and the second quarter of 2013. As shown, net annual absorption in the Cupertino/Sunnyvale submarket ranged from -64,065 square feet in 2012 to 148,420 square feet in 2011. Net annual absorption in Santa Clara County overall ranged from -627,842 square feet in 2009 to 934,119 square feet in 2007. Overall both the Cupertino/Sunnyvale submarket and Santa Clara County experienced net positive absorption over this time period. 1072 GENERAL PLAN AMENDMENT – MARKET STUDY 71 Figure 21: Net Annual Retail Absorption, Cupertino, 2006-2013 Notes: (a) Data are for shopping centers with 50,000 square feet or more. (b) Year-to-date data are through the second quarter of 2013. Sources: Terranomics, 2013; BAE, 2013. 95,392 59,059 14,213 13,388 (43,253) 148,420 (64,065) (5,669) 27,186 -100,000 -50,000 0 50,000 100,000 150,000 200,000 2006200720082009201020112012YTD 2013 (b) Annual Average 2003-2012 Ne t R e t a i l A b s o r p t i o n ( s q . f t . ) Figure 22: Net Annual Retail Absorption, Santa Clara County, 2006-2013 Notes: (a) Data are for shopping centers with 50,000 square feet or more. (b) Year-to-date data are through the second quarter of 2013. Sources: Terranomics, 2013; BAE, 2013. 410,940 934,119 718,182 (627,842) (54,034) 400,595 92,622 196,884 258,933 -800,000 -600,000 -400,000 -200,000 0 200,000 400,000 600,000 800,000 1,000,000 1,200,000 2006200720082009201020112012YTD 2013 (b) Annual Average 2003-2012 Ne t R e t a i l A b s o r p t i o n ( s q . f t . ) Vacancy and Rental Rates. Data from Terranomics on retail vacancy and asking rents suggest that the retail real estate market in Santa Clara County and the Cupertino/Sunnyvale submarket has not fully recovered from the recent recession; however, the Cupertino/Sunnyvale submarket has demonstrated a slightly stronger recovery. (See Table 23). Although retail asking rents in 1073 GENERAL PLAN AMENDMENT – MARKET STUDY 72 Cupertino/Sunnyvale trended downward between 2006 and 2010, average triple net asking rents increased from $2.21 per square foot per month in 2010 to $2.87 per square foot per month in 2012. As of the second quarter of 2013, the average retail asking rent had fallen to $2.48 per square foot per month on a triple net basis, demonstrating continuing fluctuations in the market. Retail asking rents also decreased in Santa Clara County between 2006 and 2009, but have remained at approximately 2009 levels in subsequent years. As of the second quarter of 2013, retail asking rents in Santa Clara County averaged $2.15 per square foot per month on a triple net basis. Online property listings suggest that retail leasing activity in Cupertino is relatively healthy. (See Appendix G-2 for retail listings). Retail properties currently available for lease in Cupertino generally range in price from $2.25 to $4.50 per square foot per month on a triple net basis. Figure 23: Retail Lease Rate Trends, 2006-2013 Notes: (a) Data are for shopping centers with 50,000 square feet or more. (b) Year-to-date data are through the second quarter of 2013. Sources: Terranomics, 2013; BAE, 2013. $0.00 $0.50 $1.00 $1.50 $2.00 $2.50 $3.00 $3.50 2006200720082009201020112012YTD 2013 (a) Av e r a g e N N N A s k i n g R a t e (p e r s q . f t . / m o ) Cupertino/Sunnyvale Santa Clara County Occupancy rates in Cupertino/Sunnyvale and Santa Clara County also demonstrate that the market is continuing to recover from the recession. (See Figure 24). Cupertino/Sunnyvale and Santa Clara County had retail vacancy rates averaging four percent or lower between 2006 and 2008, followed by large increases in vacancy in 2009 and 2010. At the peak in 2010, the average vacancy rate was eight percent in Cupertino/Sunnyvale and seven percent in Santa Clara County. Vacancy rates have decreased slightly in following years, ending the second quarter of 2013 at seven percent in Cupertino/Sunnyvale and six percent in Santa Clara County overall. While higher than pre-recession vacancy rates, these current rates are not outside of a range typically seen in relatively heavy markets. 1074 GENERAL PLAN AMENDMENT – MARKET STUDY 73 Figure 24: Retail Vacancy Trends, 2006-2013 Notes: (a) Data are for shopping centers with 50,000 square feet or more. (b) Year-to-date data are through the second quarter of 2013. Sources: Terranomics, 2013; BAE, 2013. 0.00% 1.00% 2.00% 3.00% 4.00% 5.00% 6.00% 7.00% 8.00% 9.00% 2006200720082009201020112012YTD 2013 (b) Va c a n c y R a t e Cupertino/Sunnyvale Santa Clara County Planned and Proposed Retail Development. As shown in Appendix H-1, retail projects in the development pipeline in Cupertino include 321,700 net square feet currently under construction and 30,900 net square feet approved but not yet under construction. Projects currently under construction include the addition of 101,000 net new square feet of retail space at the Homestead Square shopping center, the Main Street Cupertino project (130,500 square feet of new retail), the Rose Bowl (59,800 square feet of new retail), Cupertino Village (24,500 square feet of new retail), the Biltmore project with 7,000 square feet of retail, and a 20,000-square foot cafeteria for Apple employees. In addition to the projects currently under construction, there are three approved projects with planned retail space that are not yet under construction: the Oaks Shopping Center (estimated at approximately 19,000 net new square feet of retail), Saich Way Station, a redevelopment of existing retail space resulting in a net increase of 4,000 square feet of retail, and Tantau Retail, a planned 11,000-square foot retail building and parking garage. Hotel Market Overview Hotel Product Types Hotels and other lodging facilities offer a variety of product types with considerable variation in price and amenities. In addition to traditional hotels offering a range of amenity levels (often categorized as either full service, select service, or limited service lodging facilities), many hotel markets include extended stay hotels, resort hotels, boutique hotels, eco-resorts, or other types of lodging facilities. 1075 GENERAL PLAN AMENDMENT – MARKET STUDY 74 Full service lodging typically offers a full range of amenities, including dining, room service, concierge, assistance with luggage, and meeting or party rooms. Lodging facilities offering these amenities are most commonly located in large cities and cater to leisure and business travelers. Limited service lodging facilities do not offer the labor-intensive amenities offered at full-service hotels, and are often smaller properties located at freeway interchanges or near airports. Select service lodging offers a wider range of amenities than limited service hotels, but fewer amenities than are typical of full service hotels. For example, select service hotels might offer coffee and limited breakfast options in the lobby but are not likely to offer room service. With all else equal, the pricing of lodging facilities generally increases with the level of service and amenities offered. Extended-stay hotels and resort hotels provide variations on traditional hotels that respond to particular segments of lodging demand. Extended-stay hotels are typically designed to suitable for long trips by including features such as in-suite kitchen facilities, larger rooms, exercise facilities, and grocery service, and are often marketed to business travelers. Similar to more traditional hotels, extended-stay hotels show variation in price, services, and amenities. Resort hotels are typically developed as destinations, so that the resort itself is the reason for selecting a location as a travel destination, and are targeted to leisure travelers. Resorts typically offer full service dining facilities, swimming pools, spas, customized recreation services (or assistance in arranging these nearby), and general concierge services. The location, recreation, and service amenities offered at a resort are reflected in the pricing of the rooms. Over the past decade, the range of hotel product types has expanded with the increasing popularity of boutique hotels, agri-tourism, and ecotourism. Boutique hotels typically offer a strong design theme, which is reinforced with touches throughout the hotel. Examples of large operators who have specialized in boutique hotels in California include Kimpton, which operates one hotel in Cupertino, and Joie de Vivre. Boutique hotels are usually select service facilities and thus do not cater to visitors seeking multi-night stays with full amenities on-site, which reduces operating costs and room rates compared to luxury hotels. Agri-tourism includes a number of activities that bring people to a farm or ranch for recreational purposes, and is not limited to overnight trips. Examples of agri-tourism activities include fruit picking, horse riding, purchasing food from farm stands, and overnight visits at farms or ranches. Ecotourism allows some human access to sensitive environmental lands while limiting the environmental impact of travel to these areas. In place of a traditional hotel or luxury resort, lodging provided at eco resorts often consists of luxury tents or yurts. 1076 GENERAL PLAN AMENDMENT – MARKET STUDY 75 Santa Clara County and Cupertino Hotel Market Hotel Market Context. In Santa Clara County and throughout Silicon Valley, business-related travel is a key driver of demand for lodging uses, generated primarily by high-tech companies in the area and the businesses providing goods or services to them. As a result, lodging options in the area consist primarily of traditional hotels (including full, select, and limited service options), extended stay hotels, and boutique hotels. Smith Travel Research (STR), a private data vendor that provides information on performance trends in the lodging industry, tracks 271 properties in Santa Clara County with a combined total of 26,044 rooms. Previous research conducted by BAE suggests that the STR database includes at least 95 percent of all hotel rooms in Silicon Valley. Due in part to the large amount of business-related travel to Silicon Valley, extended stay hotels in the area tend to have fairly high occupancy rates. A recent study by BAE found that the occupancy rate in a selection of upscale chain extended stay hotels in San Mateo and Santa Clara Counties was 82 percent in 2012, according to STR, compared to approximately 61 percent for all hotels tracked by STR nationwide. In general, hotel occupancy rates over 70 percent are considered high. Inventory. There are five hotels in Cupertino with a total of 785 rooms: Cupertino Inn, Courtyard San Jose/Cupertino, Hilton Garden Inn Cupertino, Kimpton Cypress Hotel, and aloft Cupertino. Although each of these hotels offers many amenities and services, none offer the in- suite kitchen facilities that are typical of extended-stay hotels in Silicon Valley. (See Figure 25). Two additional proposed hotels would add 302 new hotel rooms to the city, and are discussed below. The newest of the five existing hotels is the aloft Hotel, which opened in 2013, while the oldest is the Cupertino Inn, which opened in 1987. The owner of the Cupertino Inn has expressed interest in constructing a 200- to 250-room hotel on an adjacent site as an expansion of the existing hotel. Figure 25: Hotel Inventory, Cupertino, 2013 Room Rates (per night) (a) HotelLodging TypeWeekdayWeekend Cupertino InnFull Service$209$99XXXX Courtyard San Jose/CupertinoFull Service$289-$309$119-$159XXX Hilton Garden Inn CupertinoFull Service$228-$333$92-$117 XXXX Kimpton Cypress HotelFull Service$298-$389$116-$239XXX aloft HotelFull Service$124-$349$109-$179XXX Note: (a) Nightly room rates for Cupertino Inn are based on interviews with hotel staff. Nightly room rates for the remaining four hotels are based on a survey of advertised room rates for Saturday, August 3rd and Monday, August 5th. Sources: cupertinoinn.com, 2013; marriot.com, 2013; hiltongardeninn3.hilton.com/en/index.html, 2013; thecypresshotel.com, 2013; starwoodhotels.com, 2013; BAE, 2013. Po o l Gy m In t e r n e t Ro o m S e r v i c e 1077 GENERAL PLAN AMENDMENT – MARKET STUDY 76 Occupancy and RevPAR. Demand for hotel rooms in Cupertino tends to be significantly higher during the week than on weekends, indicating that business travel is the primary source of hotel demand in the area, while leisure travel constitutes a relatively small portion of demand. Figure 26 shows occupancy rates for Santa Clara County and for midscale, upscale, and upper- upscale hotels within two miles of Cupertino, according to STR. As shown, occupancy rates among these hotels are highest on Tuesday and Wednesday nights, reaching 89 percent in mid- to upscale Cupertino area hotels and 86 percent in the County overall. Additionally, hotel operators in Cupertino estimate that 70 to 75 percent of hotel room demand in Cupertino is due to business travel, with occupancy rates frequently reaching 90 to 100 percent during the week and falling to lower levels during the weekend. Hotel room rates reflect this trend, with higher rates during the week than on weekend nights. Figure 26: Occupancy by Day of Week, August 2012-July 2013 Note: (a) Hotels sampled for the Cupertino Area include all upper midscale class, upscale class, and upper upscale class hotels within two miles of Cupertino. Sources: STR, 2013; BAE, 2013. SunMonTueWedThuFriSat Cupertino Area (a)63.5%83.0%88.8%88.8%81.7%70.4%70.2% Santa Clara County 59.7%78.3%85.5%85.5%76.8%67.7%69.9% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Hotel price and occupancy rates have shown steady increases as the economy has recovered over the past few years, indicating a strong hotel market in Cupertino and Santa Clara County. According to STR data presented in Figure 27, the average daily rate per room (ADR) for hotels in the Cupertino area and in Santa Clara County overall has increased in recent years, following a decrease in 2009 and 2010. In 2012, the average hotel occupancy rate in the Cupertino area reached 79 percent in the Cupertino area and 73 percent in Santa Clara County, surpassing occupancy rates seen during the previous five years. As a result of high occupancy rates, hotel revenues in 2012 exceeded 2008 revenues, despite have a lower ADR. 1078 GENERAL PLAN AMENDMENT – MARKET STUDY 77 Figure 27: Hotel Average Daily Rate and Occupancy Rate, 2007-2012 Note: (a) Hotels sampled for the Cupertino Area include all upper midscale class, upscale class, and upper upscale class hotels within two miles of Cupertino. Sources: STR, 2013; BAE, 2013. 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% $0 $20 $40 $60 $80 $100 $120 $140 $160 200720082009201020112012 Oc c u p a n c y R a t e Av e r a g e D a i l y R a t e ( A D R ) Cupertino Area ADR (a)Santa Clara County ADR Cupertino Area Occupancy (a)Santa Clara County Occupancy Planned and Proposed Lodging Development. The city’s development pipeline includes 302 new hotel rooms in two-mixed use developments, as discussed in the previous sections. Plans for the Oaks Shopping Center include 122 new hotel rooms along with office, retail, and convention center uses and plans for Main Street Cupertino include 180 new hotel rooms along with office, retail, and residential uses. Both projects have received development entitlements but are not yet under construction. See Appendix H-1 for a listing of planned and proposed hotel projects. 1079 GENERAL PLAN AMENDMENT – MARKET STUDY 78 POTENTIAL MARKET SUPPORT FOR NEW DEVELOPMENT As discussed in the previous sections, demand for housing, office, retail, and lodging appears to be healthy at the present time and long-term trends indicate market potential for additional development in key areas throughout the city. Based on past and current trends, projected future development, and planned and proposed projects, the following sections provide estimates of the market potential for future development in Cupertino. Demand estimates are made to 2020, to reflect near term demand, and then to 2035 to indicate the total cumulative demand over the entire planning timeframe. Population, Household and Employment Projections The Association of Bay Area Governments (ABAG) in collaboration with the Metropolitan Transportation Commission (MTC) is the regional agency responsible for preparing demographic and economic projections for the nine-county Bay Area region. ABAG and MTC released the most recent demographic projections in July 2013. These projections, known as the Final Forecast of Jobs, Population and Housing are part of the One Bay Area Plan and represent broad policy-based jobs and housing demand and production targets. The One Bay Area Plan implements the California Sustainable Communities and Climate Protection Act of 2008 (California Senate Bill 375, Steinberg), which requires each of the state’s 18 metropolitan areas, including the Bay Area, to reduce greenhouse gas emissions from cars and light trucks. As an integral element of the One Bay Area Plan, the final projections indicate future growth throughout the Bay Area through 2040 based on a regional model that estimates overall population and employment growth.18 That growth is then allocated to various jurisdictions and subareas based on an inventory of available land for development as well as policy objectives.19 According to ABAG figures, the Bay Area is projected to experience household, housing unit, and employment growth between 2010 and 2040. The rate of household and housing unit growth in Santa Clara County is expected to be slightly higher than the regional rate of growth, while employment growth in the county is expected to be similar to the regional growth rate. Growth projections for Cupertino indicate steady growth in households, housing units, and employment between 2010 and 2040, (See Table 29). Overall, figures from ABAG indicate that 18 From the One Bay Area Plan released July, 2013 and available for download at: http://onebayarea.org/pdf/final_supplemental_reports/FINAL_PBA_Forecast_of_Jobs_Population_and_Housing.pdf. 19 The last set of projections prior to the One Bay Area Plan was ABAG’s “Projections 2009” which breaks population and employment projections down into five-year increments; ABAG anticipates release of its Projections 2013 this fall or winter. 1080 GENERAL PLAN AMENDMENT – MARKET STUDY 79 Cupertino will gain almost 5,000 households and over 7,000 jobs between 2010 and 2040, based upon the City’s land inventory and ABAG policy objectives. Table 29: Population, Household, and Employment Projections, 2010 and 2040 AnnualTotal % Change% Change Households 2010 2040 (a)2010-20402010-2040 Cupertino 20,18024,0400.6%19.1% Santa Clara County604,200818,3901.0%35.5% Bay Area (b)2,608,0203,308,1100.8%26.8% Housing Units Cupertino 21,03024,0400.4%14.3% Santa Clara County631,920842,3501.0%33.3% Bay Area (b)2,785,9503,446,6400.7%23.7% Employment Cupertino 26,09033,1100.8%26.9% Santa Clara County926,2701,229,5200.9%32.7% Bay Area (b)3,385,3104,504,9401.0%33.1% Notes: (a) Projections from ABAG Jobs-Housing Connection Strategy, May 16, 2012. (b) The nine-county Bay Area includes Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, and Sonoma counties. Sources: ABAG, 2012; BAE, 2013. Housing Demand Projected demand for new residential development in Cupertino is based on ABAG’s projected residential growth in the West Valley submarket. For the purposes of the residential analysis, the West Valley submarket includes Cupertino, Campbell, Los Altos, Santa Clara, Saratoga, and Sunnyvale. As shown in Table 30, the One Bay Area Plan estimates that the West Valley submarket will gain approximately 42,400 housing units between 2010 and 2040, at an average rate of approximately 1,400 units per year. The One Bay Area Plan estimates that Cupertino will gain approximately 3,800 residential units between 2010 and 2040, constituting just under nine percent of West Valley’s housing growth. Table 30: Projected Housing Unit Growth, West Valley, 2010-2040 HousingAverage Annual Housing UnitsUnit GrowthHousing Unit 201020402010-2040Growth 2010-2040 West Valley160,030202,47042,4401,415 Cupertino21,03024,7903,760125 Campbell16,95019,9903,040101 Los Altos11,20012,3101,11037 Santa Clara45,15058,93013,780459 Saratoga9,91011,6401,73058 Sunnyvale55,79074,81019,020634 Cupertino Share of West Valley13.1%12.2%8.9%8.9% Sources: ABAG & MTC, 2012; BAE, 2013. 1081 GENERAL PLAN AMENDMENT – MARKET STUDY 80 Table 31 shows a low estimate of demand for housing in Cupertino by 2020 and 2035 along with a more aggressive high estimate. The conservative low estimate assumes that Cupertino will capture approximately 9 percent of residential growth in the West Valley submarket, at an average rate of 125 units per year, as shown in the One Bay Area Plan. The high estimate assumes that Cupertino will capture a larger share of projected growth in the West Valley between 2013 and 2035, 15.5 percent, at an average annual rate of 219 units per year. This higher capture rate was set at 175 percent of the low capture rate and assumes that that the city updates its Housing Element to strengthen its jobs-housing balance by expanding housing opportunities in light of strong demand. After subtracting housing units that have been entitled or are under construction, the low estimate results in estimated demand for 473 housing units by 2020 and 2,353 housing units by 2035 under the low estimate with the City’s 8.9 percent of the West Valley housing market. Under the high estimate, BAE estimates demand for 1,131 units by 2020 and 4,420 housing units by 2035. Note that the projected numbers for 2035 are cumulative and include projection for 2020. Table 31: Projected Housing Demand, Cupertino, 2020-2035 As discussed in the residential real estate portion of this analysis, demand for housing in Cupertino over the past decade has been strong, with high prices and little impact from the recent recession. As a result, market demand is unlikely to be a limiting factor preventing housing growth in Cupertino between now and 2035, and may exceed the estimates presented in Table 31 above. Instead, factors such as the availability of land, local polices regarding residential development, and community support or opposition to housing growth are expected to set the upper bound of potential housing growth in Cupertino over the next 20 years or more. Projected Housing Demand 20202035 Low Estimate Gross New Housing Unit Demand 8772,757 Less: Entitled Housing Units 404404 Net New Housing Unit Demand 4732,353 High Estimate Gross New Housing Unit Demand 1,5354,824 Less: Entitled Housing Units 404404 Net New Housing Unit Demand 1,1314,420 Assumptions Cupertino Capture of West Vally Growth Low Estimate Scenario 8.9% High Estimate Scenario @ 175% of Low15.5% Average # of Units Built/Year Low Estimate Scenario 125 High Estimate Scenario 219 Source: BAE, 2013. 1082 GENERAL PLAN AMENDMENT – MARKET STUDY 81 Although market support can be anticipated for most housing types, the demographic and real estate analysis suggests that there is a particularly large amount of unmet demand for residential development to serve the housing needs of young members of the workforce. As discussed in previous sections, Cupertino has a small share of young adult residents and workers, which is likely due largely to the high cost of housing in the city. Future residential development in Cupertino can better meet this segment of demand by providing smaller, more affordable units adjacent to services, retail, and entertainment options. Office Demand The demand for office space in a particular location often shifts over time in response to economic and demographic changes. As discussed above, Cupertino currently has a strong office market, characterized by high rents and low vacancy rates, which suggests potential market support for additional office development in the city. The presence of Apple in Cupertino is a significant factor driving this high demand, both because Apple occupies a large amount of office space in the City and because other companies want to locate near the Apple campus. Some businesses choose to locate in Cupertino in order to do business with Apple, while others are spin-offs established by former employees of Apple Inc. The potential range of future demand for office space in Cupertino was estimated based on past office construction and absorption trends and employment projections for the City and the West Valley submarket Employment Projections Future demand for office space can be estimated based on projected growth in employment and the amount of office space needed to accommodate anticipated growth. The One Bay Area Plan estimates that employment in the West Valley submarket will increase by 68,990 jobs between 2010 and 2040, as shown in Table 32. According to these estimates, the professional services industry, health and education industry, and leisure, hospitality, and other services industry are expected to account for much of the projected job growth in the West Valley submarket between 2010 and 2040. Using 2011 ACS data showing occupation by industry for Santa Clara County, Table 32 estimates that office-based jobs will account for 70 percent of all new jobs in the West Valley submarket between 2010 and 2040. The estimated proportion of office jobs varies by industry, ranging from 24 percent for jobs in the construction industry to 91 percent for jobs in the information and financial activities industries. Based on these proportions, the anticipated job growth in the West Valley between 2010 and 2040 is expected to include approximately 49,000 office jobs, generating demand for approximately 12 million square feet of additional office space over the 30-year period, at an average rate of approximately 405,000 additional square feet of office space per year. 1083 GENERAL PLAN AMENDMENT – MARKET STUDY 82 Table 32: Annual Office Space Demand Based on Projected Employment, West Valley, 2010-2040 New JobsPercentNumber of NewTotal Sq. Ft.Annual Sq. Ft. Industry Sector2010-2040 (b)Office (c)Office JobsNew Demand (d)2010-2040 Agriculture & Natural Resources (162)27%(44)(10,955)(365) Construction 3,29324%796 199,045 6,635 Manufacturing & Wholesale 1,02676%779 194,642 6,488 Retail 3,40082%2,805 701,205 23,373 Transportation, Warehousing, & Utilities 93044%406 101,607 3,387 Information 4,39191%4,008 1,002,027 33,401 Financial Activities 1,68191%1,537 384,302 12,810 Professional Services 28,32982%23,182 5,795,548193,185 Health & Education 14,78175%11,060 2,765,056 92,169 Leisure, Hospitality, & Other Services 10,38133%3,382 845,438 28,181 Government 939 70%660 165,054 5,502 Total 68,99070%48,57212,142,969404,766 Notes: (a) The West Valley submarket defined for this figure includes Campbell, Cupertino, Santa Clara, and Sunnyvale. (b) New jobs by industry are from the Jobs-Housing Connection Strategy Employment Distribution released by ABAG and MTC in May 2012. (c) The proportion of office jobs by industry is estimated based on 2011 ACS occupation by industry data for Santa Clara County. (d) Total new office space demand is based on an average of: 250square feet per office employee. Sources: ABAG & MTC, 2012; ACS, 2011; BAE, 2013. Recently Proposed Corporate Campuses As documented above, Cupertino is an important employment location with a strong office real estate market, which suggests high existing and future demand for office development in the city. Due to the Cupertino’s desirability as an office location, there is significant potential for the City to attract an additional corporate campus to accommodate an existing major employer or to attract a new major employer. From an economic development perspective, the City should have sufficient office allocations available to allow for a large corporate campus should the opportunity arise. Over the past few years, a number of high-tech companies have proposed substantial corporate campuses in Silicon Valley cities that have recently been constructed, are currently under construction, or are seeking entitlements. The campuses shown in Table 33 are among these projects and range from approximately 500,000 to 2.5 million square feet, with the exception of Apple Campus 2, which has a much larger total square footage. To ensure that Cupertino has the flexibility to respond to future, unforeseen demand, or demand at a peak in the business cycle, an allocation for office space should be at least 2.0 million square feet. 1084 GENERAL PLAN AMENDMENT – MARKET STUDY 83 Table 33: Corporate Campuses Recently Proposed by Silicon Valley Tech Companies Building CompanySize (sq. ft.)Location Apple3,400,000 Cupertino Google1,100,000 Mountain View (Bayfront NASA) Gilead Sciences2,500,000 Foster City Samsung680,000 North San Jose NVIDIA1,000,000 Santa Clara Vmware Inc.1,500,000 Palo Alto Stanford Research Park New Construction450,000 Renovation1,050,000 Facebook Inc.1,475,690 Menlo Park East Campus1,035,840 West Campus439,850 SRI International1,300,000 Menlo Park Sources: Silicon Valley Business Journal, 2013; Bloomberg Business Week, 2013; The Registry, 2013; City of Cupertino, 2013; Facebook, 2012; BAE, 2013. Projected Office Demand The minimum projected demand for office space in Cupertino is estimated based on ABAG’s projected employment growth in the West Valley and Cupertino’s recent capture of West Valley office absorption. As shown previously in Figure 16, annual office absorption between 2003 and 2012 averaged 60,476 square feet in Cupertino and 565,398 square feet in the West Valley submarket, resulting in a 10.7 percent capture rate of West Valley office absorption in Cupertino. Applying this capture rate to the annual average office demand projection for the West Valley (shown in Table 32 above ) results in estimated demand for office space in Cupertino averaging approximately 43,300 square feet per year. After accounting for projects currently entitled or under construction20, this suggests that minimum net office demand will total approximately 156,000 square feet by 2020 and 805,400 square feet by 2035, as shown in Table 34. However, the ABAG projections are general in nature and do not always capture the employment dynamic that introduced when a community is home to a major technology firm such as Apple Inc. Large technology companies tend to plan and grow in “spurts” that may or may not match regional projections. Furthermore, the agglomeration effect of being host to large technology companies (in terms of attracting or spinning-off firms) may not be fully captured in the projections. Hence, for the purpose of this analysis, BAE treats the Apple 20 The analysis assumes that fifty percent of planned and proposed office space is ultimately constructed. 1085 GENERAL PLAN AMENDMENT – MARKET STUDY 84 Campus 2 as an additional source of demand and presents data on large technology campus projects on the Peninsula and in Silicon Valley to indicate what potential demand may be and inform the City’s planning process. Table 34 factor in the capacity to accommodate the proposed Apple Campus 2 along with another new corporate campus equivalent in scale to the recent projects shown in Table 33, in addition to the minimum demand estimates that were developed based on projected employment. As shown, this results in a net new demand of approximately 2.9 million square feet by 2020 and 3.6 million square feet by 2035. Given the recent shortage of office spaces in Cupertino containing more than 10,000 contiguous square feet, a new recommended office allocation could also allow for multi-tenant office developments, which could create the space needed for mid-size companies to grow in Cupertino as well as accommodate a new major technology company or future expansion of an existing firm. Table 34: Projected Office Demand, Cupertino, 2013-2035 20202035 Minimum Demand Estimate Gross Demand (sq. ft.) (a)303,061952,477 Less: Entitled Office Development (sq. ft.)147,050147,050 Net New Office Demand ABAG Projections (sq. ft.)156,011805,428 Sq. Ft. Required for New Corporate Campus (sf. ft.) (b)2,000,0002,000,000 Net New Square Footage of Apple Campus 2 (c)750,000750,000 Total New Demand for Office Space2,906,0113,555,428 Assumptions Projected Average Annual Demand for Office Space, West Valley (sq. ft.)404,766 Cupertino Share of West Valley Office Employment (e)10.7% Projected Average Annual Demand for Office Space, Cupertino (sq. ft)43,294 Note: Source: BAE, 2013. (e) Cupertino share of West Valley office employment is based on Cupertino's share of West Valley office absorption between 2003 and 2012. (a) Minimum gross demand is estimated based on annual average demand for office space in Cupertino (b) Sq. ft. requirement estimated for a new corporate campus is based on corporate campuses recently proposed or approved by high-tech companies in Silicon Valley. (c) Apple Campus 2 net new sq. ft. are treated as new demand since outside scope of ABAG projections. (d) Recommended net new allocations assume that the Apple Inc. retains all of the space that it currently occupies after Apple Campus 2 is built and that the City should have enough office square footage Inc. or another large company.in the allocations balance to accommodate a new corporate campus for Apple 1086 GENERAL PLAN AMENDMENT – MARKET STUDY 85 Retail Demand Building on the leakage analysis for Cupertino, the following provides an estimate of sales that could be recaptured in the City if additional stores, matching demand by store type, were developed. Due to the balanced overall Regional Trade Area, some of the new sales needed to support new retail development would need to be retained locally, instead of occurring elsewhere in the Trade Area. Since this process depends on shifting spending patterns and providing store types targeted to local demographics, the estimate here is provided in a range of “low” and “high.” The “low” estimate assumes modest additional recapture of leaking sales, while the “high” assumes a shift in spending patterns with well-located and well-merchandised new store types. Capture from Existing Residents and Workers As shown Table 35, the range of supportable square footage of new retail space resulting from capture of current sales leakages of existing resident and worker expenditures is estimated at approximately 157,000 to 316,000 square feet.21 Table 35: Support from Existing Residents and Workers for Additional Retail Space Low Estimate AxB=C ÷ D=E Annual% AdditionalPotentialSales perSupportable Leakage ofCapture in Sales CaptureSquareNew Sq. Ft. Major Retail Category Expenditures (a)Cupertino (b)in CupertinoFoot (c)Cupertino (d) Motor Vehicle and Parts Dealers $130,400,000 0%$0$0 - Furniture and Home Furnishings Stores $6,800,000 10%$680,000$350 2,000 Electronics and Appliance Stores $39,100,000 20%$7,820,000$350 22,000 Bldg. Matrl. and Garden Equip. and Supplies$50,400,000 30%$15,120,000$250 60,000 Food and Beverage Stores $0 0%$0$0 0 Health and Personal Care Stores $10,400,000 20%$2,080,000$500 4,000 Gasoline Stations $1,900,000 0%$0$500 - Clothing and Clothing Accessories Stores$47,100,000 30%$14,130,000$350 40,000 Sporting Goods, Hobby, Book, & Music Stor $9,000,000 20%$1,800,000$350 5,000 General Merchandise Stores $0 0%$0$0 0 Miscellaneous Store Retailers $24,400,000 25%$6,100,000$350 17,000 Food Services and Drinking Places $23,600,000 10%$2,360,000 $350 7,000 Total Retail$343,100,000$50,090,000157,000 21 Zero capture is assumed in the motor vehicle sector, since it is unlikely that Cupertino will have sites available to create the critical mass necessary to support automotive retail that could compete with the nearby auto row on Stevens Creek and other regional auto dealers. No capture rate is assumed for sectors where there is currently no estimated leakage of retail sales. 1087 GENERAL PLAN AMENDMENT – MARKET STUDY 86 High Estimate AxB=C ÷ D=E Annual% AdditionalPotentialSales perSupportable Leakage ofCapture in Sales CaptureSquareNew Sq. Ft. Potential New Store Types Expenditures (a)Cupertino (b)in CupertinoFoot (c)Cupertino (d) Motor Vehicle and Parts Dealers $130,400,000 0%$0$0 - Furniture and Home Furnishings Stores $6,800,000 20%$1,360,000$350 4,000 Electronics and Appliance Stores $39,100,000 50%$19,550,000$350 56,000 Bldg. Matrl. and Garden Equip. and Supplies$50,400,000 50%$25,200,000$250 101,000 Food and Beverage Stores $0 0%$0$0 0 Health and Personal Care Stores $10,400,000 50%$5,200,000$500 10,000 Gasoline Stations $1,900,000 0%$0$500 - Clothing and Clothing Accessories Stores$47,100,000 60%$28,260,000$350 81,000 Sporting Goods, Hobby, Book, & Music Stor $9,000,000 60%$5,400,000$350 15,000 General Merchandise Stores $0 0%$0$0 0 Miscellaneous Store Retailers $24,400,000 60%$14,640,000$350 42,000 Food Services and Drinking Places $23,600,000 10%$2,360,000 $350 7,000 Total Retail$343,100,000$101,970,000316,000 (a) From Table 14. (b) Capture of resident potential expenditures assumes appropriates sites for each retail type will be made available in Cupertino. Rounded to nearest hundred thousand. (c) Sales per square foot based on consultant experience derived from a variety of sources, including corporate 10-K reports. (d) Rounded to nearest thousand. Sources: BAE 2013, based on data from corporate SEC filings, Urban Land Institute/International Council of Shopping Centers, Hinterliter de Lamas, and other sources as noted in supporting tables and appendices. Capture from New Residents and Workers In addition to the potential to recapture of current resident expenditures at retail outlets in the city, population and employment growth in Cupertino should also support additional retail development. The supportable square footage of new retail space resulting from capture of expenditures from new residents and workers through 2035 is estimated at approximately 177,000 to 205,000 square feet (see Table 36). This estimate uses the same capture rates as for existing residents and workers as shown above in Table 35, and assuming a constant rate of growth in population and employment, is equivalent to slightly more than 8,000 square feet per year from 2014 through 2035. Capture from Outside City of Cupertino While retail expenditures from City residents are greater than actual expenditures within the city, this is “net” leakage (in most major retail categories); in reality, Cupertino is capturing sales from non-residents at the same time Cupertino residents are shopping elsewhere. For instance, the residential neighborhoods closest to Cupertino Village and its Ranch 99 market are in Sunnyvale. As indicated by Cupertino’s injections of sales for general merchandise stores, Vallco’s anchor stores attract customers from outside Cupertino (and Cupertino residents undoubtedly frequent Valley Fair and Santana Row). Cupertino’s ability to increase retail attraction to non-residents will depend largely on the future development of new region-serving retail as well as upgrades to Vallco and its environs, constrained by the continued competitiveness of other region serving centers in the Retail Trade Area and beyond. Currently, Valley Fair, Santana Row, the cluster of retail around the Westgate Shopping Center, and other centers provide a strong attraction to residents of 1088 GENERAL PLAN AMENDMENT – MARKET STUDY 87 Cupertino and surrounding communities. For the purposes of the analysis here, no additional net capture of non-resident retail expenditures is assumed. 1089 GENERAL PLAN AMENDMENT – MARKET STUDY 88 Table 36: Additional Retail Support from Population and Employment Growth, 2014-2035 Low Estimate ABCDEFGHIJKL (a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l) Baseline Per CapitaTotal Additional Annual AdditionalAdditionalAdditionalTotal Supportable Annual ExpendituresRetail Potential Sales in $0002013SalesNewSalesPotentialSales perRetail EstimatedEstimated EstimatedCaptureCaptureCapturein $000NewSquareSquare Feet ResidentWorkerResidentsWorkers Total PotentialRateinoffrom NewSalesFootin Store Category ExpendituresExpenditures Expenditures $000LeakageCaptureCapture Cupertino Motor Vehicle and Parts Dealers $2,324 $0$24,150$0$24,150na $00%$0$0$0 na Furniture and Home Furnishings Stores $353 $0$3,666$0$3,66668%$2,48010%$119$2,599$350 7,000 Electronics and Appliance Stores $816$446$8,482$802$9,28427%$2,47520%$1,362$3,837$35011,000 Bldg. Matrl. and Garden Equip. and Supplies$1,068 $0$11,095$0$11,09521%$2,30330%$2,638$4,941$25020,000 Food and Beverage Stores $2,480$1,079$25,775$1,937$27,712104%$27,712 0%$0$27,712$0 na Health and Personal Care Stores $687$380$7,137$682$7,81977%$6,01220%$361$6,373$50013,000 Gasoline Stations $918 $0$9,545$0$9,54597%$9,212 0%$0$9,212$50018,000 Clothing and Clothing Accessories Stores $1,372$579$14,255$1,039$15,29446%$7,08330%$2,463$9,547$35027,000 Sporting Goods, Hobby, Book, & Music Stores $393$174$4,086$313$4,39964%$2,83420%$313$3,147$350 9,000 General Merchandise Stores $1,772$1,633$18,419$2,934$21,352104%$21,352 0%$0$21,352$0 na Miscellaneous Store Retailers $347$558$3,604$1,002$4,6058%$35425%$1,063$1,417$350 4,000 Food Services and Drinking Places $2,410$1,442$25,048$2,591$27,63985%$23,52710%$411$23,938$35068,000 Total $14,939$6,292$155,261$11,300$166,560 $105,345 $8,730$114,075 177,000 High Estimate ABCDEFGHIJKL (a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l) Baseline Per CapitaTotal Additional Annual AdditionalAdditionalAdditionalTotal Supportable Annual ExpendituresRetail Potential Sales in $0002013SalesNewSalesPotentialSales perRetail EstimatedEstimated EstimatedCaptureCaptureCapturein $000NewSquareSquare Feet ResidentWorkerResidentsWorkers Total PotentialRateinoffrom NewSalesFootin Store Category ExpendituresExpenditures Expenditures $000LeakageCaptureCapture Cupertino Motor Vehicle and Parts Dealers $2,324 $0$24,150$0$24,150na $00%$0$0$0 na Furniture and Home Furnishings Stores $353 $0$3,666$0$3,66668%$2,48020%$237$2,717$350 8,000 Electronics and Appliance Stores $816$446$8,482$802$9,28427%$2,47550%$3,404$5,880$35017,000 Bldg. Matrl. and Garden Equip. and Supplies$1,068 $0$11,095$0$11,09521%$2,30350%$4,396$6,699$25027,000 Food and Beverage Stores $2,480$1,079$25,775$1,937$27,712104%$27,712 0%$0$27,712$0 na Health and Personal Care Stores $687$380$7,137$682$7,81977%$6,01250%$904$6,915$50014,000 Gasoline Stations $918 $0$9,545$0$9,54597%$9,212 0%$0$9,212$50018,000 Clothing and Clothing Accessories Stores $1,372$579$14,255$1,039$15,29446%$7,08360%$4,926$12,010$35034,000 Sporting Goods, Hobby, Book, & Music Stores $393$174$4,086$313$4,39964%$2,83460%$939$3,773$35011,000 General Merchandise Stores$1,772$1,633$18,419$2,934$21,352104%$21,352 0%$0$21,352$0na Miscellaneous Store Retailers$347$558$3,604$1,002$4,6058%$35460%$2,551$2,905$3508,000 Food Services and Drinking Places$2,410$1,442$25,048$2,591$27,63985%$23,52710%$411$23,938$35068,000 Total$14,939$6,292$155,261$11,300$166,560$105,345$17,769$123,114205,000 All sales, expenditures, and leakages are expressed in 2013 dollar equivalents. Total additional potential sales are in $000. (a) From Appendix C. (b) From Appendix E. (c) Column A times estimated population increase in Cupertino, 2013-2040. Population increased derived from using an average annual compound rate to trend out population over the time period. Population in 2010 and 2040 derived from household estimates per times DOF estimate of average household size in 2013. Increase in Resident Population, 2013-2040 12,993 (d) Column B times estimated increase in net worker inflows in Cupertino 2013-2040. Net worker inflow derived using an average annual compound rate to trend out worker growth over the time period. Number of workers in 2010 and 2040 derived from worker estimates per times the 2011 percent inflow of workers per LEHD as noted in Appendix F. Increase in Net Worker Inflows, 2013-2040 2,252 (e) E = C + D (f) F = (100%-leakage), where "leakage" is the leakage/injection percentage column from Table 14. Since leakage is a negative number while injection is positive, this is representative of the total capture of potential sales, and thus also of categories that show captures greater than 100%. (g) G = minimum of (E x F) or E. This caps the capture at 100% for sectors with no leakage of sales. Consistent with the lack of suitable sites for motor vehicle retail in Cupertino, no capture is assumed for the motor vehicle sector. (h) Assumes same additional capture of leakage as for existing residents and workers. (i) I = H x (E - G) (j) J = G + I (k) From Table 35. (l) L = J x K Sources: BAE 2013, based on data from CA Department of Industrial Relations; U.S. Bureau of Labor Statistics; U.S. Census of Retail Trade, 2007; 2010 Zip Code and County Business Patterns; CA Dept. of Finance; Nielsen SiteReports; U.S. Census Bureau Longitudinal Employer-Household Dynamics (LEHD); Corporate SEC filings, Urban Land Institute/International Council of Shopping Centers (ULI/ICSC); Hinterliter de Lamas; and other sources as noted in supporting tables and appendices. 1090 GENERAL PLAN AMENDMENT – MARKET STUDY 89 Demand for Additional Retail The retail analysis indicates that demand for retail from existing and new residents and workers in Cupertino will total approximately 227,800 to 398,000 square feet by 2020 and 334,000 to 521,000 square feet by 2035. Projects that are entitled or currently under construction in Cupertino include approximately 353,000 square feet of retail space. Assuming that fifty percent of these projects are built, the potential remaining demand through 2020 would be 51,800 to 222,000 square feet and by 2035 would be approximately 158,000 square feet under the low scenario and 345,000 square feet under the high scenario, depending on the quality of new and redeveloped stores and their ability to recapture sales currently leaking to stores elsewhere in the Regional Trade Area. While a portion of this new demand can be meet with new retail facilities in all four corridors, the primary opportunity for capturing existing and new retail demand would be in the Vallco Shopping district. However, the Vallco shopping center will need to be reformulated or redeveloped in order to be attractive to both retailers and shoppers (see detailed discussion of these issues in the Retail Strategy). Table 37: Projected Retail Demand and Allocation Balances, Cupertino, 2020 & 2035 LowHighLowHigh Sq. Ft.Sq. Ft.Sq. Ft.Sq. Ft. Demand from Existing Residents and Workers157,000316,000157,000316,000 Demand from Residential and Employment Growth70,800 82,000 177,000 205,000 Total Gross Retail Demand 227,800398,000334,000521,000 Less: Entitled Retail Projects 176,000176,000176,000176,000 Net New Retail Demand 51,800222,000158,000345,000 Note: 2035 estimate is cumulative and includes estimates for 2020. Source: BAE, 2013. 2020 Estimate 2035 Estimate 1091 GENERAL PLAN AMENDMENT – MARKET STUDY 90 Hotel Demand As discussed above, the hotel market in Cupertino is relatively robust, as indicated by strong occupancy rates at the city’s five existing hotels. Demand for hotel rooms is particularly strong during the week due to high levels of business travel to Cupertino. There has been recent interest in additional hotel development in Cupertino with the opening of the Aloft hotel in early 2013, and approximately 300 new hotel rooms in the city’s development pipeline. Furthermore, some property owners have expressed interest in developing additional hotel rooms that are not yet in the project pipeline. The potential range of future hotel room demand in Cupertino was estimated based on the city’s current share of hotel rooms in Santa Clara County and projected employment and household growth. Table 38 shows the range of projected demand for hotel rooms in Santa Clara County and Cupertino in 2020 and 2035. As shown, business travel is estimated to account for 75 percent of hotel room demand in Santa Clara County, and leisure travel is estimated to account for 25 percent of hotel room demand. Using this breakdown, the number of existing hotel rooms in Santa Clara County, and current employment and household estimates for the county, the table shows that current demand allows for 0.021 hotel rooms per employee and 0.011 hotel rooms per household. The One Bay Area Plan anticipates an annual average growth rate of 7,140 households and 10,108 jobs in Santa Clara County between 2010 and 2040. Based on this future growth, lodging demand in the county could support an approximately 2,000 new hotel rooms by 2020 and over 6,000 new hotel rooms by 2035. Again, note that these are cumulative estimates (e.g., the estimated for 2020 in contained in the total for 2035). As shown in Table 38, hotel rooms in Cupertino currently account for approximately three percent of hotel rooms in Santa Clara County. The low end of the demand estimate assumes that the City continues to capture a similar share of hotel room demand through 2035. A high estimate is also presented that takes into consideration the catalyst effect of the Apple Campus 2 and new professional football stadium in Santa Clara on Cupertino’s lodging market, while the high end of the demand estimate assumes that the City will capture ten percent of new hotel room demand through 2035. Using the low capture rate, estimated net hotel room demand in Cupertino is negative through 2020 after subtracting fifty percent of the 302 hotel rooms currently in the city’s development pipeline (e.g., 151 rooms), which means that the number of hotel rooms in the project pipeline exceed the market demand for new lodging. By 2035, there is demand for 40 additional rooms. The high demand estimate uses the higher capture rate. Under the high demand scenario, there is positive demand by 2020 for up to 51 rooms and by 2035 demand for 485 additional hotel rooms. This high demand estimate would suggest demand for three to four additional standard hotel properties (e.g., 125 to 150 rooms) over the long term. However, the hotel 1092 GENERAL PLAN AMENDMENT – MARKET STUDY 91 demand estimate needs an adjustment when applied to setting new allocations. Multiple hotel sites need to be planned for to give the City flexibility in locating new hotel facilities and to account for the riskiness of new hotel development (designated sites often remain undeveloped for extended periods of time to due to credit market and site ownership characteristics. Allocating 1,000 hotel rooms under a high demand scenario would permit such flexibility since even if half the rooms ultimately were not built, long term demand shown in Table 38 would be likely met. Table 38: Projected Lodging Demand, Cupertino Projected Growth, Santa Clara County 20202035 Employment Growth, Santa Clara County (2013 Base Yr)70,758222,383 Household Growth, Santa Clara County (2013 Base Yr)49,978157,073 Growth in Hotel Room Demand from Business Travel 1,4864,671 Growth in Hotel Room Demand from Leisure Travel 539 1,693 Total Growth in Hotel Room Demand 2,0256,364 Projected Hotel Room Demand, Cupertino 20202035 Low Estimate (a) Gross New Hotel Room Demand 61191 Less: Planned and Proposed Hotel Rooms (151)(151) Net New Hotel Room Demand - Low (90)40 High Estimate (b) Gross New Hotel Room Demand 202636 Less: Planned and Proposed Hotel Rooms (151)(151) Net New Hotel Room Demand - High 51485 Assumptions Total Hotel Rooms - Cupertino 785 Total Hotel Rooms - Santa Clara County 26,044 Cupertino Share of Santa Clara County Hotel Rooms 3.0% Cupertino Potential Share of Santa Clara County Hotel Rooms (c)10.0% Total Employees in Santa Clara County 929,952 Percent of Hotel Stays from Business Travel 75% Hotel Rooms per Employee 0.021 Projected Annual Average Employment Growth, 2010-2040 10,108 Total Households in Santa Clara County 604,204 Percent of Hotel Stays from Leisure Travel 25% Hotel Rooms per Household 0.011 Projected Annual Average Household Growth, 2010-2040 7,140 Notes: (a) The low estimate of projected hotel room demand assumes that Cupertino continues to capture the same portion of the County's hotel room demand, or approximately three percent of countywide demand, and that all of the hotel rooms that are currently entitled are built. (b) The high estimate of projected hotel room demand assumes that, over the medium to long term, Cupertino captures a slightly higher portion of countywide hotel room demand than the City currently captures, and that half of the hotel rooms that are currenly entitled are built. (c) Cupertino's potential share of Santa Clara County hotel rooms assumes that the City will capture a slightly higher proportion of countywide hotel room demand than the City currently captures. Sources: US Census, 2010; ACS, 2007-2011; STR, 2013; BAE, 2013. 1093 GENERAL PLAN AMENDMENT – MARKET STUDY 92 Summary of Demand Estimates Based on the above analysis, the following table summarizes the market demand findings of this report. These findings will be considered during the planning process and inform the setting of new allocations for the indicated uses. Table 40: Summary of Demand Estimates Office LowHighLowHighLowHigh Through 2020 Demand Through 2020 (Units/Sq.Ft.)8771,535303,061227,800 398,000 61202 Demand Adjustments (a)- - 2,750,000 - - - - Less: Entitled Projects (404)(404)147,050176,000 176,000 (151)(151) Net Demand 4731,9392,906,01151,800 222,000(90)51 Through 2035 Demand Through 2035 (Units/Sq.Ft.)2,7574,824952,477 334,000521,000 191636 Demand Adjustments - - 2,750,000(a)- - - 500 (b) Less: Entitled Projects 404404147,050176,000176,000(151)(151) Net Demand 2,3534,4203,555,428158,000345,00040985 Notes: (a) For Office Apple Campus 2 and 1.5 million sq.ft. added; see text for description. (b) Adjustment for flexibility in meeting long-term demand under high scenario; see text for description. Sources: City of Cupertino; BAE 2013. Residential HotelRetail 1094 93 APPENDIX A: ZIP CODES IN THE RETAIL TRADE AREA Table A-1: Zip Codes in the Retail Trade Area Zip Code City 94022 Los Altos 94023 Los Altos 94024 Los Altos 94035 Mountain View 94039 Mountain View 94040 Mountain View 94041 Mountain View 94043 Mountain View 94085 Sunnyvale 94086 Sunnyvale 94087 Sunnyvale 94088 Sunnyvale 94089 Sunnyvale 95008 Campbell 95009 Campbell 95014 Cupertino 95015 Cupertino 95050 Santa Clara 95051 Santa Clara 95052 Santa Clara 95053 Santa Clara 95055 Santa Clara 95070 Saratoga 95071 Saratoga 95117 San Jose 95129 San Jose 95130 San Jose Note: Some Zip Codes represent single-organization sites or Post Office Boxes, but have establishments listed in Zip Code Business Patterns. 1095 94 APPENDIX B: RETAIL SALES TRENDS 1096 95 Ta b l e B - 1 a : C u p e r t i n o T a x a b l e R e t a i l S a l e s T r e n d s , 2 0 0 0 - 2 0 0 8 Sa l e s i n 2 0 1 3 $ 0 0 0 ( a ) ( b ) ( c ) 20 0 0 2 0 0 1 2 0 0 2 2 0 0 3 2 0 0 4 2 0 0 5 2 0 0 6 2 0 0 7 2 0 0 8 M o t o r V e h i c l e s a n d P a r t s $6 0 , 7 1 7 $ 5 7 , 3 5 0 # # $ 2 2 , 5 1 1 $ 3 , 5 1 4 $ 3 , 8 0 2 $ 3 , 5 5 6 $ 3 , 4 6 5 H o m e F u r n i s h i n g s a n d A p p l i a n c e s $4 9 , 4 3 8 $ 3 2 , 8 3 2 $ 2 7 , 2 2 2 $ 2 2 , 6 5 8 $ 1 6 , 5 1 9 $ 1 7 , 4 4 2 $ 1 1 , 1 4 4 $ 1 1 , 0 8 8 $ 1 0 , 5 8 5 B u i l d i n g M a t e r i a l s $9 , 2 7 4 $ 7 , 0 4 4 $ 6 , 2 7 4 $ 4 , 9 7 6 # # # ## F o o d S t o r e s $3 4 , 1 9 2 $ 3 2 , 3 9 5 $ 3 2 , 2 2 8 $ 3 0 , 5 5 7 $ 3 0 , 5 4 1 $ 3 1 , 6 6 3 $ 3 0 , 5 3 5 $ 3 3 , 2 6 0 $ 3 3 , 6 6 5 S e r v i c e S t a t i o n s $6 3 , 0 9 4 $ 5 7 , 0 7 6 $ 4 8 , 8 9 6 $ 5 4 , 4 8 4 $ 6 1 , 3 7 4 $ 6 9 , 3 1 8 $ 6 8 , 1 4 0 $ 7 2 , 9 0 1 $ 7 3 , 9 2 7 A p p a r e l S t o r e s $4 4 , 3 9 8 $ 3 6 , 2 2 1 $ 3 1 , 9 1 5 $ 2 8 , 4 5 4 $ 2 5 , 6 3 2 $ 2 4 , 5 6 8 $ 2 1 , 7 2 9 $ 2 0 , 7 4 9 $ 1 7 , 4 2 0 G e n e r a l M e r c h a n d i s e S t o r e s $2 6 0 , 9 5 5 $ 2 4 0 , 6 4 6 $ 2 1 0 , 9 9 0 $ 1 9 0 , 2 0 2 $ 1 9 0 , 3 1 0 $ 1 8 1 , 4 6 4 $ 1 7 0 , 8 8 6 $ 1 7 1 , 6 1 2 $ 1 5 4 , 4 7 0 E a t i n g a n d D r i n k i n g P l a c e s $1 2 8 , 6 0 7 $ 1 2 2 , 2 2 8 $ 1 0 8 , 3 0 4 $ 1 0 5 , 8 1 1 $ 1 0 4 , 5 5 6 $ 1 1 8 , 4 4 1 $ 1 2 5 , 1 8 7 $ 1 2 7 , 5 7 0 $ 1 2 0 , 9 0 4 O t h e r R e t a i l S t o r e s $1 6 8 , 3 8 9 $ 1 6 1 , 6 2 9 $ 1 5 1 , 7 9 5 $ 1 1 8 , 9 8 2 $ 8 3 , 4 2 1 $ 7 9 , 5 0 2 $ 8 3 , 8 7 0 $ 2 9 7 , 0 6 6 $ 2 3 1 , 6 9 8 Re t a i l S t o r e s T o t a l $8 1 9 , 0 6 5 $ 7 4 7 , 4 2 0 $ 6 1 7 , 6 2 6 $ 5 5 6 , 1 2 5 $ 5 3 4 , 8 6 4 $ 5 2 5 , 9 1 1 $ 5 1 5 , 2 9 4 $ 7 3 7 , 8 0 2 $ 6 4 6 , 1 3 4 Sa l e s p e r C a p i t a i n 2 0 1 3 $ ( d ) 20 0 0 2 0 0 1 2 0 0 2 2 0 0 3 2 0 0 4 2 0 0 5 2 0 0 6 2 0 0 7 2 0 0 8 M o t o r V e h i c l e s a n d P a r t s $1 , 2 0 0 $ 1 , 1 2 6 # # $ 4 2 4 $ 6 6 $ 7 0 $ 6 4 $ 6 2 H o m e F u r n i s h i n g s a n d A p p l i a n c e s $9 7 7 $ 6 4 5 $ 5 2 3 $ 4 3 4 $ 3 1 1 $ 3 2 5 $ 2 0 5 $ 1 9 9 $ 1 8 8 B u i l d i n g M a t e r i a l s $1 8 3 $ 1 3 8 $ 1 2 0 $ 9 5 # # # ## F o o d S t o r e s $6 7 6 $ 6 3 6 $ 6 1 9 $ 5 8 5 $ 5 7 5 $ 5 9 0 $ 5 6 2 $ 5 9 8 $ 5 9 8 S e r v i c e S t a t i o n s $1 , 2 4 7 $ 1 , 1 2 0 $ 9 3 9 $ 1 , 0 4 4 $ 1 , 1 5 6 $ 1 , 2 9 2 $ 1 , 2 5 4 $ 1 , 3 1 1 $ 1 , 3 1 3 A p p a r e l S t o r e s $8 7 7 $ 7 1 1 $ 6 1 3 $ 5 4 5 $ 4 8 3 $ 4 5 8 $ 4 0 0 $ 3 7 3 $ 3 0 9 G e n e r a l M e r c h a n d i s e S t o r e s $5 , 1 5 7 $ 4 , 7 2 4 $ 4 , 0 5 1 $ 3 , 6 4 4 $ 3 , 5 8 5 $ 3 , 3 8 3 $ 3 , 1 4 5 $ 3 , 0 8 6 $ 2 , 7 4 4 E a t i n g a n d D r i n k i n g P l a c e s $2 , 5 4 2 $ 2 , 3 9 9 $ 2 , 0 8 0 $ 2 , 0 2 7 $ 1 , 9 7 0 $ 2 , 2 0 8 $ 2 , 3 0 4 $ 2 , 2 9 4 $ 2 , 1 4 8 O t h e r R e t a i l S t o r e s $3 , 3 2 8 $ 3 , 1 7 3 $ 2 , 9 1 5 $ 2 , 2 7 9 $ 1 , 5 7 1 $ 1 , 4 8 2 $ 1 , 5 4 3 $ 5 , 3 4 2 $ 4 , 1 1 6 Re t a i l S t o r e s T o t a l $1 6 , 1 8 6 $ 1 4 , 6 7 2 $ 1 1 , 8 5 9 $ 1 0 , 6 5 4 $ 1 0 , 0 7 5 $ 9 , 8 0 6 $ 9 , 4 8 3 $ 1 3 , 2 6 7 $ 1 1 , 4 7 7 Po p u l a t i o n 5 0 , 6 0 2 5 0 , 9 4 1 5 2 , 0 8 0 5 2 , 1 9 7 5 3 , 0 8 7 5 3 , 6 3 2 5 4 , 3 3 8 5 5 , 6 1 1 5 6 , 2 9 7 (a ) R e t a i l s a l e s h a v e b e e n a d j u s t e d t o 2 0 1 3 d o l l a r s b a s e d o n t h e B a y A r e a C o n s u m e r P r i c e I n d e x , U . S . B u r e a u o f L a b o r S t a t i s t i c s. A t t h e b e g i n n i n g o f 2 0 0 7 , S B O E m a d e so m e m i n o r c h a n g e s t o t h e i r c l a s s i f i c a t i o n s y s t e m , t h u s y e a r - t o - y ea r c o m p a r i s o n s w i t h p r e v i o u s y e a r s s h o u l d b e m a d e w i t h c a u t i o n. 2 0 0 9 - 2 0 1 1 d a t a p r e s e n t e d i n a s e p a r a t e ta b l e d u e t o m a j o r c h a n g e i n c a t e g o r i z a t i o n s c h e m e , s u c h t h a t d a t a a r e n o t f u l l y c o m p a r a b l e w i t h e a r l i e r y e a r s . (b ) A n a l y s i s e x c l u d e s a l l n o n - r e t a i l o u t l e t s ( b u s i ne s s a n d p e r s o n a l s e r v i c e s ) r e p o r t i n g t a x a b l e s a l e s . (c ) A " # " s i g n i n d i c a t e s d a t a u n a v a i l a b i l i t y f o r t h e c a t e g o r y d u e t o S B O E c o n f i d e n t i a l i t y r u l e s t h a t s u p p r e s s d a t a w h e n t h e r e ar e f o u r o r f e w e r o u t l e t s o r s a l e s i n a c a t e g o r y do m i n a t e d b y o n e s t o r e . S u p p r e s s e d s a l e s h a v e b e e n c o m b i n e d w i t h O t h e r R e t a i l S t o r e s . (d ) P e r c a p i t a s a l e s c a l c u l a t e d b a s e d o n s a l e s d i v i d e d b y p o p u l a ti o n . 2 0 0 0 a n d 2 0 1 0 p o p u l a t i o n f r o m U . S . C e n s u s ; e s t i m a t e s f o r o t h e r y e a r s f r o m C A S t a t e D e p t . o f F i n a n c e . So u r c e s : 2 0 0 0 & 2 0 1 0 U . S . C e n s u s ; S t a t e D e p t . o f F i n a n c e ; S t a t e B o a r d o f E q u a l i z a t i o n ; C A D e p t . o f I n d u s t r i a l R e l a t i o n s ; U . S . Bu r e a u o f L a b o r S t a t i s t i c s ; B A E , 2 0 1 3 . 10 9 7 96 Ta b l e B - 1 b : C u p e r t i n o T a x a b l e R e t a i l S a l e s T r e n d s , 2 0 0 9 - 2 0 1 2 Sa l e s i n 2 0 1 3 $ 0 0 0 ( a ) ( b ) ( c ) 20 0 9 2 0 1 0 2 0 1 1 2 0 1 2 (f ) M o t o r V e h i c l e a n d P a r t s D e a l e r s $ 3 , 2 9 9 $ 2 , 9 8 5 $ 2 , 9 9 1 $ 3 , 8 3 4 H o m e F u r n i s h i n g s a n d A p p l i a n c e S t o r e s ( e ) # # $ 1 9 3 , 3 9 0 # B l d g . M a t r l . a n d G a r d e n E q u i p . & S u p p l i e s ( e $1 5 , 4 1 8 $ 1 6 , 6 5 5 $ 1 3 , 7 6 7 $ 2 0 , 7 8 2 F o o d a n d B e v e r a g e S t o r e s $ 3 4 , 3 4 9 $ 3 5 , 4 7 1 $ 3 4 , 8 5 7 $ 3 8 , 2 1 6 G a s o l i n e S t a t i o n s $ 5 5 , 7 5 2 $ 6 5 , 8 3 9 $ 7 8 , 3 5 7 $ 8 1 , 2 2 8 C l o t h i n g & C l o t h i n g A c c e s s o r i e s S t o r e s $ 3 0 , 8 1 7 $ 3 3 , 0 4 3 $ 3 5 , 4 7 1 $ 4 1 , 3 9 8 G e n e r a l M e r c h a n d i s e S t o r e s $ 1 2 9 , 7 9 6 $ 1 1 8 , 3 3 4 $ 1 1 7 , 6 8 5 $ 1 0 8 , 8 5 3 F o o d S e r v i c e s a n d D r i n k i n g P l a c e s $ 1 1 2 , 7 7 7 $ 1 2 1 , 3 1 3 $ 1 3 1 , 3 9 6 $ 1 3 4 , 9 0 9 O t h e r R e t a i l G r o u p $ 2 3 1 , 3 5 9 $ 2 6 6 , 9 3 5 $ 1 0 4 , 9 4 8 $ 3 2 2 , 8 7 5 Re t a i l S t o r e s T o t a l $6 1 3 , 5 6 6 $ 6 6 0 , 5 7 5 $ 7 1 2 , 8 6 3 $ 7 5 2 , 0 9 7 Sa l e s p e r C a p i t a i n 2 0 1 3 $ ( d ) 20 0 9 2 0 1 0 2 0 1 1 2 0 1 2 (f ) M o t o r V e h i c l e a n d P a r t s D e a l e r s $ 5 8 $ 5 1 $ 5 1 $ 6 5 H o m e F u r n i s h i n g s a n d A p p l i a n c e S t o r e s ( e ) # # $ 3 , 2 9 7 # B l d g . M a t r l . a n d G a r d e n E q u i p . & S u p p l i e s ( e $2 6 9 $ 2 8 6 $ 2 3 5 $ 3 5 3 F o o d a n d B e v e r a g e S t o r e s $6 0 0 $ 6 0 8 $ 5 9 4 $ 6 4 8 G a s o l i n e S t a t i o n s $9 7 3 $ 1 , 1 2 9 $ 1 , 3 3 6 $ 1 , 3 7 8 C l o t h i n g & C l o t h i n g A c c e s s o r i e s S t o r e s $5 3 8 $ 5 6 7 $ 6 0 5 $ 7 0 2 G e n e r a l M e r c h a n d i s e S t o r e s $2 , 2 6 6 $ 2 , 0 3 0 $ 2 , 0 0 6 $ 1 , 8 4 7 F o o d S e r v i c e s a n d D r i n k i n g P l a c e s $1 , 9 6 9 $ 2 , 0 8 1 $ 2 , 2 4 0 $ 2 , 2 8 9 O t h e r R e t a i l G r o u p $4 , 0 3 8 $ 4 , 5 7 8 $ 1 , 7 8 9 $ 5 , 4 7 9 Re t a i l S t o r e s T o t a l $1 0 , 7 1 0 $ 1 1 , 3 3 0 $ 1 2 , 1 5 1 $ 1 2 , 7 6 2 Po p u l a t i o n 5 7 , 2 8 9 5 8 , 3 0 2 5 8 , 6 6 5 5 8 , 9 3 1 (a ) R e t a i l s a l e s h a v e b e e n a d j u s t e d t o 2 0 1 3 d o l l a r s b a s e d o n t h e B a y A r e a C o n s u m e r P r i c e I n d e x , U . S . B u r e a u o f L a b o r S t a t i s t i c s. A t t h e b e g i n n i n g o f 2 0 0 7 , S B O E m a d e so m e m i n o r c h a n g e s t o t h e i r c l a ss i f i c a t i o n s y s t e m , t h u s y e a r - t o - y e a r c o m p a r i s o n s w i th p r e v i o u s y e a r s s h o u l d b e m a d e w i t h c a u t i o n. 2 0 0 9 - 2 0 1 1 d a t a p r e s e n t e d i n a s e p a r a t e ta b l e d u e t o m a j o r c h a n g e i n c a t e g o r i za t i o n s c h e m e , s u c h t h a t d a t a a r e n o t f u l l y c o m p a r a b l e w i t h e a r l i e r y e a r s . (b ) A n a l y s i s e x c l u d e s a l l n o n - r e t a i l o u t l e t s ( b u s i n e s s a n d p e r s o n a l s e r v i c e s ) r e p o r t i n g t a x a b l e s a l e s . (c ) A " # " s i g n i n d i c a t e s d a t a u n a v a i l a b i l i t y f o r t h e c a t e g o r y d u e t o S B O E c o n f i d e n t i a l i t y r u l e s t h a t s u p p r e s s d a t a w h e n t h e r e ar e f o u r o r f e w e r o u t l e t s o r s a l e s i n a ca t e g o r y d o m i n a t e d b y o n e s t o r e . S u p p r e s s e d s a le s h a v e b e e n c o m b i n e d w i t h O t h e r R e t a i l G r o u p . (d ) P e r c a p i t a s a l e s c a l c u l a t e d b a s e d o n s a l e s d i v i d e d b y p o p u l a t i o n . 2 0 0 0 a n d 2 0 1 0 p o p u l a t i o n f r o m U . S . C e n s u s ; e s t i m a t e s f o r o t h e r y e a r s f r o m C A S t a t e D e p t . o f F i n a n c e . (e ) F o r 2 0 1 1 , d a t a i n t h i s c a t e g o r y s u p p r e s s e d f o r 1 o f t h e 4 q u a r t e r s , s o s o m e s a l e s f o r t h a t p e r i o d a r e u n d e r O t h e r R e t a i l G r ou p . (f ) 2 0 1 2 d a t a o b t a i n e d f r o m C i t y F i n a n c e D e p a r t m e n t b a s e d o n M u n i S e r v i c e s r e p o r t o n s a l e s t a x c o l l e c t i o n . So u r c e s : 2 0 0 0 & 2 0 1 0 U . S . C e n s u s ; S t a t e D e p t . o f F i n a n c e ; S t a t e B o a r d o f E q u a l i z a t i o n ; C A D e p t . o f I n d u s t r i a l R e l a t i o n s ; U . S . Bu r e a u o f L a b o r S t a t i s t i c s ; C i t y o f C u p e r t i n o ; B A E , 2 0 1 3 . 10 9 8 97 Ta b l e B - 2 a : S a n t a C l a r a C o u n t y T a x a b l e R e t a i l S a l e s T r e n d s , 2 0 0 0 - 2 0 0 8 Sa l e s i n 2 0 1 3 $ 0 0 0 ( a ) ( b ) ( c ) 20 0 0 2 0 0 1 2 0 0 2 2 0 0 3 2 0 0 4 2 0 0 5 2 0 0 6 2 0 0 7 2 0 0 8 M o t o r V e h i c l e s a n d P a r t s $ 5 , 3 6 1 , 0 0 0 $ 4 , 6 0 2 , 6 9 4 $4 , 0 7 0 , 3 3 2 $ 3 , 9 2 7 , 9 0 0 $ 4 , 0 5 4 , 7 4 1 $ 4 , 0 9 5 , 98 2 $ 4 , 0 2 8 , 2 0 4 $ 3 , 9 3 9 , 9 1 0 $ 2 , 9 8 5 , 6 8 4 H o m e F u r n i s h i n g s a n d A p p l i a n c e s $ 1 , 6 0 3 , 9 2 0 $ 1 , 25 1 , 3 5 3 $ 1 , 0 8 2 , 8 2 5 $ 9 9 8 , 0 3 7 $ 1 , 0 2 5 , 3 2 7 $ 1 , 02 9 , 9 7 3 $ 1 , 0 3 2 , 2 9 7 $ 1 , 0 2 3 , 7 4 2 $ 1 , 1 7 7 , 2 4 9 B u i l d i n g M a t e r i a l s $ 1 , 9 3 4 , 5 7 0 $ 1 , 7 7 8 , 0 8 8 $ 1 , 69 0 , 5 0 6 $ 1 , 7 0 6 , 9 2 5 $ 1 , 9 7 1 , 3 9 7 $ 1 , 9 9 6 , 06 1 $ 2 , 0 2 9 , 0 8 8 $ 1 , 7 9 7 , 0 2 7 $ 1 , 4 9 4 , 5 4 0 F o o d S t o r e s $ 1 , 1 4 8 , 4 2 9 $ 1 , 1 1 2 , 6 0 4 $ 1 , 0 6 0 , 39 8 $ 1 , 0 2 4 , 6 3 9 $ 1 , 0 1 1 , 9 2 6 $ 1 , 0 0 5 , 57 4 $ 9 9 6 , 3 8 4 $ 1 , 0 1 1 , 4 4 7 $ 9 5 7 , 0 0 0 S e r v i c e S t a t i o n s $ 1 , 9 6 9 , 1 4 7 $ 1 , 7 9 3 , 4 5 4 $ 1 , 5 7 6 , 31 7 $ 1 , 7 6 6 , 0 6 8 $ 2 , 0 3 9 , 7 2 8 $ 2 , 3 0 9 , 1 6 2 $2 , 4 6 4 , 7 3 6 $ 2 , 6 3 6 , 1 4 7 $ 2 , 7 8 3 , 1 2 1 A p p a r e l S t o r e s $ 1 , 1 9 3 , 7 4 3 $ 1 , 1 4 1 , 7 4 3 $ 1 , 1 2 1 , 52 4 $ 1 , 1 6 1 , 5 6 8 $ 1 , 2 9 7 , 5 7 3 $ 1 , 4 1 5 , 5 4 4 $1 , 4 8 3 , 1 8 8 $ 1 , 5 1 5 , 5 1 0 $ 1 , 5 6 7 , 4 5 7 G e n e r a l M e r c h a n d i s e S t o r e s $ 3 , 8 8 8 , 7 1 1 $ 3 , 5 1 5 , 9 0 7 $3 , 2 6 7 , 7 0 9 $ 3 , 2 3 5 , 8 0 2 $ 3 , 3 5 6 , 0 3 3 $ 3 , 4 3 8 , 60 9 $ 3 , 4 9 5 , 4 4 3 $ 3 , 5 3 5 , 9 1 0 $ 3 , 2 4 6 , 2 9 2 E a t i n g a n d D r i n k i n g P l a c e s $ 3 , 1 2 2 , 1 6 2 $ 2 , 8 9 3 , 82 4 $ 2 , 7 1 7 , 4 5 0 $ 2 , 6 7 3 , 4 5 5 $ 2 , 8 1 8 , 7 9 2 $ 2 , 95 4 , 9 3 2 $ 3 , 1 0 4 , 0 6 1 $ 3 , 1 9 6 , 2 2 0 $ 3 , 1 6 9 , 5 7 8 O t h e r R e t a i l S t o r e s $ 6 , 7 1 0 , 1 2 2 $ 5 , 0 9 2 , 5 3 7 $ 4 , 30 0 , 6 0 9 $ 4 , 1 4 4 , 0 3 4 $ 4 , 3 0 6 , 3 3 4 $ 4 , 6 4 3 , 10 2 $ 4 , 8 7 7 , 6 2 6 $ 4 , 9 6 2 , 2 8 0 $ 3 , 8 9 7 , 6 7 4 Re t a i l S t o r e s T o t a l $2 6 , 9 3 1 , 8 0 5 $ 2 3 , 1 8 2 , 2 0 4 $ 2 0 , 8 8 7 , 6 6 9 $ 2 0 , 6 3 8 , 4 2 8 $ 2 1 , 8 8 1 , 8 5 1 $ 2 2 , 8 8 8 , 9 4 1 $ 2 3 , 5 1 1 , 0 2 7 $ 2 3 , 6 1 8 , 1 9 3 $ 2 1 , 2 7 8 , 5 9 6 Sa l e s p e r C a p i t a i n 2 0 1 3 $ ( d ) 20 0 0 2 0 0 1 2 0 0 2 2 0 0 3 2 0 0 4 2 0 0 5 2 0 0 6 2 0 0 7 2 0 0 8 M o t o r V e h i c l e s a n d P a r t s $ 3 , 1 8 6 $2 , 7 2 3 $ 2 , 4 0 4 $ 2 , 3 1 9 $ 2 , 3 9 1 $ 2 , 4 1 2 $ 2 , 3 6 0 $ 2 , 2 8 4 $ 1 , 7 0 8 H o m e F u r n i s h i n g s a n d A p p l i a n c e s $9 5 3 $7 4 0 $6 4 0 $5 8 9 $6 0 5 $6 0 6 $605$593$674 B u i l d i n g M a t e r i a l s $1 , 1 5 0 $ 1 , 0 5 2 $9 9 8 $ 1 , 0 0 8 $ 1 , 1 6 3 $ 1 , 1 7 5 $ 1 , 1 8 9 $ 1 , 0 4 2 $855 F o o d S t o r e s $6 8 3 $6 5 8 $6 2 6 $6 0 5 $5 9 7 $5 9 2 $584$586$548 S e r v i c e S t a t i o n s $1 , 1 7 0 $ 1 , 0 6 1 $9 3 1 $ 1 , 0 4 3 $ 1 , 2 0 3 $ 1 , 3 6 0 $ 1 , 4 4 4 $ 1 , 5 2 8 $ 1 , 5 9 2 A p p a r e l S t o r e s $7 0 9 $6 7 5 $6 6 2 $6 8 6 $7 6 5 $8 3 4 $869$879$897 G e n e r a l M e r c h a n d i s e S t o r e s $2 , 3 1 1 $ 2 , 0 8 0 $ 1 , 9 3 0 $ 1 , 9 1 0 $ 1 , 9 7 9 $ 2 , 0 2 5 $ 2 , 0 4 8 $ 2 , 0 5 0 $ 1 , 8 5 7 E a t i n g a n d D r i n k i n g P l a c e s $1 , 8 5 6 $ 1 , 7 1 2 $ 1 , 6 0 5 $ 1 , 5 7 8 $ 1 , 6 6 2 $ 1 , 7 4 0 $ 1 , 8 1 9 $ 1 , 8 5 3 $ 1 , 8 1 3 O t h e r R e t a i l S t o r e s $3 , 9 8 8 $ 3 , 01 3 $ 2 , 5 4 0 $ 2 , 4 4 7 $ 2 , 5 4 0 $ 2 , 7 3 4 $ 2 , 8 5 8 $ 2 , 8 7 7 $ 2 , 2 3 0 Re t a i l S t o r e s T o t a l $1 6 , 0 0 6 $ 1 3 , 7 1 4 $ 1 2 , 3 3 6 $ 1 2 , 1 8 5 $ 1 2 , 9 0 5 $ 1 3 , 4 7 8 $ 1 3 , 7 7 6 $ 1 3 , 6 9 1 $ 1 2 , 1 7 4 Po p u l a t i o n 1 , 6 8 2 , 5 8 5 1 , 6 9 0 , 3 6 6 1 , 6 9 3 , 2 3 0 1 , 6 9 3 , 7 5 2 1 , 6 9 5 , 6 0 2 1 , 6 9 8 , 2 3 4 1 , 70 6 , 6 7 6 1 , 7 2 5 , 0 6 6 1 , 7 4 7 , 9 1 2 (a ) R e t a i l s a l e s h a v e b e e n a d j u s t e d t o 2 0 1 3 d o l l a r s b a s e d o n t h e B a y A r e a C o n s u m e r P r i c e I n d e x , U . S . B u r e a u o f L a b o r S t a t i s t i c s. A t t h e b e g i n n i n g o f 2 0 0 7 , S B O E m a d e so m e m i n o r c h a n g e s t o t h e i r c l a s s i f i c a t i o n s y s t e m , t h u s y e a r - t o - y ea r c o m p a r i s o n s w i t h p r e v i o u s y e a r s s h o u l d b e m a d e w i t h c a u t i o n. 2 0 0 9 - 2 0 1 1 d a t a p r e s e n t e d i n a s e p a r a t e ta b l e d u e t o m a j o r c h a n g e i n c a t e g o r i z a t i o n s c h e m e , s u c h t h a t d a t a a r e n o t f u l l y c o m p a r a b l e w i t h e a r l i e r y e a r s . (b ) A n a l y s i s e x c l u d e s a l l n o n - r e t a i l o u t l e t s ( b u s i n e s s a n d p e r s o n a l s e r v i c e s ) r e p o r t i n g t a x a b l e s a l e s . (c ) A " # " s i g n i n d i c a t e s d a t a u n a v a i l a b i l i t y f o r t h e c a t e g o r y d ue t o S B O E c o n f i d e n t i a l i t y r u l e s t h a t s u p p r e s s d a t a w h e n t h e r e ar e f o u r o r f e w e r o u t l e t s o r s a l e s i n a c a t e g o r y do m i n a t e d b y o n e s t o r e . S u p p r e s s e d s a l e s h a ve b e e n c o m b i n e d w i t h O t h e r R e t a i l S t o r e s . (d ) P e r c a p i t a s a l e s c a l c u l a t e d b a s e d o n s a l e s d i v i d e d b y p o p u l a t i o n . 2 0 0 0 a n d 2 0 1 0 p o p u l a t i o n f r o m U . S . C e n s u s ; e s t i m a t e s f o r o t h e r y e a r s f r o m C A S t a t e D e p t . o f F i n a n c e . So u r c e s : 2 0 0 0 & 2 0 1 0 U . S . C e n s u s ; S t a t e D e p t . o f F i n a n c e ; S t a t e B o a r d o f E q u a l i z a t i o n ; C A D e p t . o f I n d u s t r i a l R e l a t i o n s ; U . S . Bu r e a u o f L a b o r S t a t i s t i c s ; B A E , 2 0 1 3 . 10 9 9 98 Ta b l e B - 2 b : S a n t a C l a r a C o u n t y T a xa b l e R e t a i l S a l e s T r e n d s , 2 0 0 9 - 2 0 1 1 Sa l e s i n 2 0 1 3 $ 0 0 0 ( a ) ( b ) ( c ) 20 0 9 2 0 1 0 2 0 1 1 M o t o r V e h i c l e a n d P a r t s D e a l e r s $2 , 4 9 8 , 1 9 3 $ 2 , 7 3 8 , 4 9 2 $ 3 , 0 4 4 , 3 0 4 H o m e F u r n i s h i n g s a n d A p p l i a n c e S t o r e s $ 1 , 7 7 5 , 0 5 3 $ 1 , 9 7 4 , 3 6 8 $ 2 , 0 8 5 , 3 8 3 B l d g . M a t r l . a n d G a r d e n E q u i p . & S u p p l i e s $ 1 , 2 7 4 , 1 9 2 $ 1 , 3 4 4 , 3 5 0 $ 1 , 3 8 4 , 9 2 1 F o o d a n d B e v e r a g e S t o r e s $1 , 0 6 6 , 5 1 4 $ 1 , 0 6 2 , 6 0 9 $ 1 , 0 7 5 , 5 7 6 G a s o l i n e S t a t i o n s $1 , 9 6 8 , 9 5 3 $ 2 , 2 7 1 , 0 0 5 $ 2 , 6 9 1 , 5 9 6 C l o t h i n g & C l o t h i n g A c c e s s o r i e s S t o r e s $ 1 , 8 4 8 , 6 9 3 $ 1 , 9 6 8 , 7 0 2 $ 2 , 1 0 0 , 3 7 2 G e n e r a l M e r c h a n d i s e S t o r e s $2 , 4 8 5 , 2 1 0 $ 2 , 5 5 5 , 9 1 8 $ 2 , 5 7 4 , 3 9 0 F o o d S e r v i c e s a n d D r i n k i n g P l a c e s $2 , 9 5 8 , 7 9 0 $ 3 , 0 7 3 , 8 3 4 $ 3 , 2 5 7 , 2 1 4 O t h e r R e t a i l G r o u p $2 , 0 4 5 , 9 9 5 $ 2 , 1 0 4 , 2 6 1 $ 2 , 2 0 8 , 0 3 2 Re t a i l S t o r e s T o t a l $1 7 , 9 2 1 , 5 9 3 $ 1 9 , 0 9 3 , 5 4 0 $ 2 0 , 4 2 1 , 7 8 9 Sa l e s p e r C a p i t a i n 2 0 1 3 $ ( d ) 20 0 9 2 0 1 0 2 0 1 1 M o t o r V e h i c l e a n d P a r t s D e a l e r s $1 , 4 1 4 $ 1 , 5 3 7 $ 1 , 6 9 7 H o m e F u r n i s h i n g s a n d A p p l i a n c e S t o r e s $1 , 0 0 4 $ 1 , 1 0 8 $ 1 , 1 6 2 B l d g . M a t r l . a n d G a r d e n E q u i p . & S u p p l i e s $7 2 1 $7 5 5 $7 7 2 F o o d a n d B e v e r a g e S t o r e s $6 0 4 $5 9 6 $5 9 9 G a s o l i n e S t a t i o n s $1 , 1 1 4 $ 1 , 2 7 5 $ 1 , 5 0 0 C l o t h i n g & C l o t h i n g A c c e s s o r i e s S t o r e s $1 , 0 4 6 $ 1 , 1 0 5 $ 1 , 1 7 1 G e n e r a l M e r c h a n d i s e St o r e s $1 , 4 0 6 $ 1 , 4 3 5 $ 1 , 4 3 5 F o o d S e r v i c e s a n d D r i n k i n g P l a c e s $1 , 6 7 4 $ 1 , 7 2 5 $ 1 , 8 1 5 O t h e r R e t a i l G r o u p $1 , 1 5 8 $ 1 , 1 8 1 $ 1 , 2 3 1 Re t a i l S t o r e s T o t a l $1 0 , 1 4 1 $ 1 0 , 7 1 7 $ 1 1 , 3 8 1 Po p u l a t i o n 1 , 7 6 7 , 2 0 4 1 , 7 8 1 , 6 4 2 1 , 7 9 4 , 3 3 7 (a ) R e t a i l s a l e s h a v e b e e n a d j u s t e d t o 2 0 1 3 d o l l a r s b a s e d o n t h e B a y A r e a C o n s u m e r P r i c e I n d e x , U . S . B u r e a u o f L a b o r S t a t i s t i c s. A t t h e b e g i n n i n g o f 2 0 0 7 , S B O E m a d e so m e m i n o r c h a n g e s t o t h e i r c l a s s i f i c a t i o n s y s t e m , t h u s y e a r - t o - y ea r c o m p a r i s o n s w i t h p r e v i o u s y e ar s s h o u l d b e m a d e w i t h c a u t i o n. 2 0 0 9 - 2 0 1 1 d a t a p r e s e n t e d i n a s e p a r a t e ta b l e d u e t o m a j o r c h a n g e i n c a t e g o r i z a t i o n s c h e m e , s u c h t h a t d a t a a r e n o t f u l l y c o m p a r a b l e w i t h e a r l i e r y e a r s . (b ) A n a l y s i s e x c l u d e s a l l n o n - r e t a i l o u t l e t s ( b u s in e s s a n d p e r s o n a l s e r v i c e s ) r e p o r t i n g t a x a b l e s a l e s . (c ) A " # " s i g n i n d i c a t e s d a t a u n a va i l a b i l i t y f o r t h e c a t e g o r y d u e t o S B O E c o n f i d en t i a l i t y r u l e s t h a t s u p p r e s s d a t a w h e n t h e r e ar e f o u r o r f e w e r o u t l e t s o r s a l e s i n a ca t e g o r y d o m i n a t e d b y o n e s t o r e . S u p p r e s s e d s a l e s h a v e b e e n c o m b i n e d w i t h O t h e r R e t a i l G r o u p . (d ) P e r c a p i t a s a l e s c a l c u l a t e d b a s e d o n sa l e s d i v i d e d b y p o p u l a t i o n . 2 0 0 0 a n d 2 0 1 0 p o p u l a t i o n f r o m U . S . C e n s u s ; e s t i m a t e s f o r o t h e r y e a r s f r o m C A S t a t e D e p t . o f F i n a n c e . So u r c e s : 2 0 0 0 & 2 0 1 0 U . S . C e n s u s ; S t a t e D e p t . o f F i n a n c e ; S t a t e Bo a r d o f E q u a l i z a t i o n ; C A D e p t . o f I n d u s t r i a l R e l a t i o n s ; U . S . Bu r e a u o f L a b o r S t a t i s t i c s ; B A E , 2 0 1 3 . 11 0 0 99 Ta b l e B - 3 a : C a l i f o r n i a T a x a b l e R e t a i l S a l e s T r e n d s , 2 0 0 0 - 2 0 0 8 Sa l e s i n 2 0 1 3 $ 0 0 0 ( a ) ( b ) ( c ) 20 0 0 2 0 0 1 2 0 0 2 2 0 0 3 2 0 0 4 2 0 0 5 2 0 0 6 2 0 0 7 2 0 0 8 M o t o r V e h i c l e s a n d P a r t s $ 7 8 , 7 1 3 , 0 7 0 $ 8 1 , 1 2 7 , 2 5 3 $ 8 3 , 1 7 8 , 0 8 5 $ 8 5 , 4 1 5 , 4 4 3 $ 8 7 , 8 4 3 , 6 9 3 $ 8 8 , 1 1 2 , 4 2 9 $ 8 2 , 4 7 0 , 5 3 9 7 8 , 9 5 7 , 5 4 4 58,843,346 H o m e F u r n i s h i n g s a n d A p p l i a n c e s $ 1 8 , 8 6 0 , 8 6 1 $ 1 7 , 7 9 6 , 5 8 9 $ 1 8 , 2 2 4 , 4 1 5 $ 1 9 , 2 4 0 , 7 4 9 $ 2 0 , 3 6 3 , 4 5 9 $ 2 0 , 8 1 7 , 0 1 5 $ 2 0 , 0 2 9 , 7 0 4 1 8 , 6 5 2 , 6 9 6 18,556,189 B u i l d i n g M a t e r i a l s $ 3 4 , 4 1 8 , 6 6 1 $ 3 5 , 3 2 2 , 0 6 4 $ 3 6 , 5 8 9 , 1 6 6 $ 3 9 , 0 9 9 , 7 3 1 $ 4 6 , 0 8 8 , 6 3 3 $ 4 7 , 4 7 6 , 3 1 1 $ 4 5 , 8 7 1 , 9 9 0 3 6 , 4 2 9 , 2 7 3 28,749,433 F o o d S t o r e s $ 2 5 , 4 9 5 , 4 3 2 $ 2 5 , 1 2 6 , 8 5 6 $ 2 4 , 6 9 9 , 3 7 1 $ 2 4 , 7 2 2 , 9 6 6 $ 2 4 , 6 0 9 , 1 2 8 $ 2 5 , 2 9 4 , 1 0 3 $ 2 5 , 1 9 2 , 5 2 9 2 5 , 0 5 6 , 0 9 8 23,200,980 S e r v i c e S t a t i o n s $ 3 4 , 9 7 9 , 1 1 6 $ 3 2 , 8 7 0 , 9 8 3 $ 3 1 , 1 8 5 , 8 1 4 $ 3 5 , 3 0 4 , 7 3 1 $ 4 0 , 6 6 3 , 5 3 3 $ 4 6 , 1 7 0 , 2 2 8 $ 5 0 , 2 1 3 , 7 9 2 5 2 , 5 2 4 , 9 0 0 56,119,209 A p p a r e l S t o r e s $ 1 7 , 8 2 6 , 3 9 7 $ 1 7 , 8 7 1 , 7 0 0 $ 1 8 , 2 8 4 , 2 5 3 $ 1 9 , 3 3 6 , 9 1 7 $ 2 1 , 0 4 8 , 3 7 9 $ 2 2 , 4 0 1 , 3 5 9 $ 2 2 , 8 4 8 , 0 1 7 2 3 , 2 6 5 , 4 7 6 23,865,351 G e n e r a l M e r c h a n d i s e S t o r e s $ 6 3 , 5 9 0 , 6 2 5 $ 6 2 , 9 9 3 , 4 0 6 $ 6 3 , 1 9 2 , 9 5 4 $ 6 4 , 3 9 4 , 9 6 8 $ 6 6 , 9 5 3 , 5 0 3 $ 6 7 , 9 8 3 , 1 6 0 $ 6 8 , 2 8 6 , 6 9 6 6 6 , 8 1 7 , 5 9 2 60,877,395 E a t i n g a n d D r i n k i n g P l a c e s $ 4 9 , 2 0 4 , 9 9 5 $ 4 9 , 1 8 8 , 5 1 9 $ 4 9 , 6 2 9 , 4 3 4 $ 5 1 , 0 1 7 , 9 5 0 $ 5 3 , 7 1 5 , 9 9 1 $ 5 5 , 5 6 3 , 4 8 3 $ 5 6 , 7 2 3 , 5 3 6 5 7 , 6 2 6 , 9 5 0 56,158,216 O t h e r R e t a i l S t o r e s $ 7 5 , 2 3 2 , 1 9 6 $ 7 0 , 0 9 3 , 4 7 2 $ 6 8 , 1 0 7 , 7 5 7 $ 6 9 , 3 8 0 , 1 6 4 $ 7 3 , 3 7 2 , 4 0 6 $ 7 6 , 0 8 3 , 3 8 6 $ 7 6 , 6 5 6 , 7 6 7 7 2 , 4 0 9 , 5 2 8 59,140,436 Re t a i l S t o r e s T o t a l $3 9 8 , 3 2 1 , 3 5 3 $ 3 9 2 , 3 9 0 , 8 4 2 $ 3 9 3 , 0 9 1 , 2 4 9 $ 4 0 7 , 9 1 3 , 6 1 9 $ 4 3 4 , 6 5 8 , 7 2 5 $ 4 4 9 , 9 0 1 , 4 7 4 $ 4 4 8 , 2 9 3 , 5 7 0 $ 4 3 1 , 7 4 0 , 0 5 6 $ 3 8 5 , 5 1 0 , 5 5 6 Sa l e s p e r C a p i t a i n 2 0 1 3 $ ( d ) 20 0 0 2 0 0 1 2 0 0 2 2 0 0 3 2 0 0 4 2 0 0 5 2 0 0 6 2 0 0 7 2 0 0 8 M o t o r V e h i c l e s a n d P a r t s $ 2 , 3 2 4 $ 2 , 3 6 8 $ 2 , 3 9 5 $ 2 , 4 2 9 $ 2 , 4 7 0 $ 2 , 4 5 6 $ 2 , 2 8 3 $ 2 , 1 6 9 $ 1 , 6 0 3 H o m e F u r n i s h i n g s a n d A p p l i a n c e s $ 5 5 7 $ 5 2 0 $ 5 2 5 $ 5 4 7 $ 5 7 2 $ 5 8 0 $ 5 5 5 $ 5 1 2 $ 5 0 6 B u i l d i n g M a t e r i a l s $ 1 , 0 1 6 $ 1 , 0 3 1 $ 1 , 0 5 4 $ 1 , 1 1 2 $ 1 , 2 9 6 $ 1 , 3 2 4 $ 1 , 2 7 0 $ 1 , 0 0 1 $ 7 8 3 F o o d S t o r e s $ 7 5 3 $ 7 3 3 $ 7 1 1 $ 7 0 3 $ 6 9 2 $ 7 0 5 $ 6 9 8 $ 6 8 8 $ 6 3 2 S e r v i c e S t a t i o n s $ 1 , 0 3 3 $ 9 6 0 $ 8 9 8 $ 1 , 0 0 4 $ 1 , 1 4 3 $ 1 , 2 8 7 $ 1 , 3 9 0 $ 1 , 4 4 3 $ 1 , 5 2 9 A p p a r e l S t o r e s $ 5 2 6 $ 5 2 2 $ 5 2 7 $ 5 5 0 $ 5 9 2 $ 6 2 5 $ 6 3 3 $ 6 3 9 $ 6 5 0 G e n e r a l M e r c h a n d i s e S t o r e s $ 1 , 8 7 7 $ 1 , 8 3 9 $ 1 , 8 2 0 $ 1 , 8 3 1 $ 1 , 8 8 2 $ 1 , 8 9 5 $ 1 , 8 9 1 $ 1 , 8 3 6 $ 1 , 6 5 9 E a t i n g a n d D r i n k i n g P l a c e s $ 1 , 4 5 3 $ 1 , 4 3 6 $ 1 , 4 2 9 $ 1 , 4 5 1 $ 1 , 5 1 0 $ 1 , 5 4 9 $ 1 , 5 7 1 $ 1 , 5 8 3 $ 1 , 5 3 0 O t h e r R e t a i l S t o r e s $ 2 , 2 2 1 $ 2 , 0 4 6 $ 1 , 9 6 1 $ 1 , 9 7 3 $ 2 , 0 6 3 $ 2 , 1 2 1 $ 2 , 1 2 3 $ 1 , 9 8 9 $ 1 , 6 1 1 Re t a i l S t o r e s T o t a l $1 1 , 7 5 9 $ 1 1 , 4 5 4 $ 1 1 , 3 2 0 $ 1 1 , 6 0 0 $ 1 2 , 2 2 0 $ 1 2 , 5 4 3 $ 1 2 , 4 1 3 $ 1 1 , 8 6 1 $ 1 0 , 5 0 3 Po p u l a t i o n 3 3 , 8 7 3 , 0 8 6 3 4 , 2 5 6 , 7 8 9 3 4 , 7 2 5 , 5 1 6 3 5 , 1 6 3 , 6 0 9 3 5 , 5 7 0 , 8 4 7 3 5 , 8 6 9 , 1 7 3 3 6 , 1 1 6 , 2 0 2 3 6 , 3 9 9 , 6 7 6 3 6 , 7 0 4 , 3 7 5 (a ) R e t a i l s a l e s h a v e b e e n a d j u s t e d t o 2 0 1 3 d o l l a r s b a s e d o n t h e CA C o n s u m e r P r i c e I n d e x , f r o m t h e C A D e p t . o f I n d u s t r i a l R e l a ti o n s , b a s e d o n d a t a f r o m t h e U . S . B u r e a u o f L a b o r S t a t i s t i c s . At t h e b e g i n n i n g o f 2 0 0 7 , S B O E m a d e s o m e m i n o r c h a n g e s t o t h e i r c l a s s i f i c a t i o n s y s t e m , t h u s y e a r - t o - y e a r c o m p a r i s o n s w i t h p r e v i ou s y e a r s s h o u l d b e m a d e w i t h c a u t i o n . 2 0 0 9 - 2 0 1 1 d a t a pr e s e n t e d i n a s e p a r a t e t a b l e d u e t o m a j o r c h a n g e i n c a t e g o r i z a t i o n s c h e m e , s u c h t h a t d a t a a r e n o t f u l l y c o m p a r a b l e w i t h e a r l i e r y e a r s . (b ) A n a l y s i s e x c l u d e s a l l n o n - r e t a i l o u t l e t s ( b u s i n e s s a n d p e r s o n a l s e r v i c e s ) r e p o r t i n g t a x a b l e s a l e s . (c ) A " # " s i g n i n d i c a t e s d a t a u n a v a i l a b i l i t y f o r t h e c a t e g o r y d u e t o S B O E c o n f i d e n t i a l i t y r u l e s t h a t s u p p r e s s d a t a w h e n t h e r e a r e f o u r o r f e w e r o u t l e t s o r s a l e s i n a c a t e g o r y do m i n a t e d b y o n e s t o r e . S u p p r e s s e d s a l e s h a v e b e e n c o m b i n e d w i t h O t h e r R e t a i l S t o r e s . (d ) P e r c a p i t a s a l e s c a l c u l a t e d b a s e d o n s a l e s d i v i d e d b y p o p u la t i o n . 2 0 0 0 a n d 2 0 1 0 p o p u l a t i o n f r o m U . S . C e n s u s ; e s t i m a t e s f o r o t h e r y e a r s f r o m C A S t a t e D e p t . o f F i n a n c e . So u r c e s : 2 0 0 0 & 2 0 1 0 U . S . C e n s u s ; S t a t e D e p t . o f F i n a n c e ; S t a t e B o a r d o f E q u a l i z a t i o n ; C A D e p t . o f I n d u s t r i a l R e l a t i o n s ; U . S . Bu r e a u o f L a b o r S t a t i s t i c s ; B A E , 2 0 1 3 . 11 0 1 10 0 Ta b l e B - 3 b : C a l i f o r n i a T a x a b l e R e t a i l S a l e s T r e n d s , 2 0 0 9 - 2 0 1 1 Sa l e s i n 2 0 1 3 $ 0 0 0 ( a ) ( b ) ( c ) 20 0 9 2 0 1 0 2 0 1 1 M o t o r V e h i c l e a n d P a r t s D e a l e r s $ 4 8 , 1 4 7 , 5 5 9 $ 5 0 , 6 1 6 , 3 5 6 $ 5 5 , 5 0 3 , 3 4 3 H o m e F u r n i s h i n g s a n d A p p l i a n c e S t o r e s $ 2 3 , 6 6 3 , 8 8 6 $ 2 4 , 0 4 0 , 7 4 8 $ 2 4 , 5 5 1 , 1 6 0 B l d g . M a t r l . a n d G a r d e n E q u i p . & S u p p l i e s $ 2 5 , 9 5 0 , 6 4 0 $ 2 6 , 4 5 5 , 1 4 9 $ 2 7 , 1 4 0 , 1 1 0 F o o d a n d B e v e r a g e S t o r e s $ 2 4 , 4 0 0 , 8 2 1 $ 2 4 , 3 5 6 , 4 9 2 $ 2 4 , 5 8 0 , 3 5 9 G a s o l i n e S t a t i o n s $ 4 2 , 2 9 2 , 1 6 8 $ 4 8 , 3 4 0 , 6 7 7 $ 5 7 , 4 8 8 , 6 0 1 C l o t h i n g & C l o t h i n g A c c e s s o r i e s S t o r e s $ 2 7 , 7 5 0 , 3 8 6 $ 2 9 , 1 4 4 , 9 9 9 $ 3 0 , 8 2 1 , 6 5 5 G e n e r a l M e r c h a n d i s e S t o r e s $ 4 8 , 6 1 6 , 6 5 2 $ 4 9 , 5 1 3 , 5 4 7 $ 5 0 , 2 0 9 , 0 2 2 F o o d S e r v i c e s a n d D r i n k i n g P l a c es $ 5 4 , 0 2 7 , 8 2 1 $ 5 4 , 8 1 3 , 6 3 8 $ 5 7 , 0 1 5 , 7 2 7 O t h e r R e t a i l G r o u p $ 4 1 , 9 6 3 , 5 1 8 $ 4 1 , 9 9 7 , 2 2 4 $ 4 2 , 8 8 0 , 3 2 7 Re t a i l S t o r e s T o t a l $3 3 6 , 8 1 3 , 4 5 1 $ 3 4 9 , 2 7 8 , 8 3 1 $ 3 7 0 , 1 9 0 , 3 0 4 Sa l e s p e r C a p i t a i n 2 0 1 3 $ ( d ) 20 0 9 2 0 1 0 2 0 1 1 M o t o r V e h i c l e a n d P a r t s D e a l e r s $ 1 , 3 0 2 $ 1 , 3 5 9 $ 1 , 4 8 3 H o m e F u r n i s h i n g s a n d A p p l i a n c e S t o r e s $ 6 4 0 $ 6 4 5 $ 6 5 6 B l d g . M a t r l . a n d G a r d e n E q u i p . & S u p p l i e s $ 7 0 2 $ 7 1 0 $ 7 2 5 F o o d a n d B e v e r a g e S t o r e s $ 6 6 0 $ 6 5 4 $ 6 5 7 G a s o l i n e S t a t i o n s $ 1 , 1 4 4 $ 1 , 2 9 8 $ 1 , 5 3 6 C l o t h i n g & C l o t h i n g A c c e s s o r i e s S t o r e s $ 7 5 1 $ 7 8 2 $ 8 2 3 G e n e r a l M e r c h a n d i s e S t o r e s $ 1 , 3 1 5 $ 1 , 3 2 9 $ 1 , 3 4 1 F o o d S e r v i c e s a n d D r i n k i n g P l a c e s $ 1 , 4 6 2 $ 1 , 4 7 1 $ 1 , 5 2 3 O t h e r R e t a i l G r o u p $ 1 , 1 3 5 $ 1 , 1 2 7 $ 1 , 1 4 6 Re t a i l S t o r e s T o t a l $9 , 1 1 1 $ 9 , 3 7 6 $ 9 , 8 9 1 Po p u l a t i o n 3 6 , 9 6 6 , 7 1 3 3 7 , 2 5 3 , 9 5 6 3 7 , 4 2 7 , 9 4 6 (a ) R e t a i l s a l e s h a v e b e e n a d j u s t e d t o 2 0 1 3 d o l l a r s b a s e d o n t h e C A C o n s u m e r P r i c e I n d e x , f r o m t h e C A D e p t . o f I n d u s t r i a l R e l a ti o n s , b a s e d o n d a t a f r o m t h e U . S . B u r e a u o f L a b o r S t a t i s t i c s . At t h e b e g i n n i n g o f 2 0 0 7 , S B O E m a d e s o m e m i n o r c h a n g e s t o t h e i r c l a s s i f i c a t i o n s y s t e m , t h u s y e a r - t o - y e a r c o m p a r i s o n s w i t h p r e v i ou s y e a r s s h o u l d b e m a d e w i t h c a u t i o n . 2 0 0 9 - 2 0 1 1 d a t a pr e s e n t e d i n a s e p a r a t e t a b l e d u e t o m a j o r c h a n g e i n c a t e g o r i z a t i o n s c h e m e , s u c h t h a t d a t a a r e n o t f u l l y c o m p a r a b l e w i t h e a r l i e r y e a r s . (b ) A n a l y s i s e x c l u d e s a l l n o n - r e t a i l o u t l e t s ( b u s in e s s a n d p e r s o n a l s e r v i c e s ) r e p o r t i n g t a x a b l e s a l e s . (c ) A " # " s i g n i n d i c a t e s d a t a u n a v a i l a b i l i t y f o r t h e c a t e g o r y d u e t o S B O E c o n f i d e n t i a l i t y r u l e s t h a t s u p p r e s s d a t a w h e n t h e r e ar e f o u r o r f e w e r o u t l e t s o r s a l e s i n a ca t e g o r y d o m i n a t e d b y o n e s t o r e . S u p p r e s s e d s a l e s h a v e b e e n c o m b i n e d w i t h O t h e r R e t a i l G r o u p . (d ) P e r c a p i t a s a l e s c a l c u l a t e d b a s e d o n sa l e s d i v i d e d b y p o p u l a t i o n . 2 0 0 0 a n d 2 0 1 0 p o p u l a t i o n f r o m U . S . C e n s u s ; e s t i m a t e s f o r o t h e r y e a r s f r o m C A S t a t e D e p t . o f F i n a n c e . So u r c e s : 2 0 0 0 & 2 0 1 0 U . S . C e n s u s ; S t a t e D e p t . o f F i n a n c e ; S t a t e B o a r d o f E q u a l i z a t i o n ; C A D e p t . o f I n d u s t r i a l R e l a t i o n s ; U . S . Bu r e a u o f L a b o r S t a t i s t i c s ; B A E , 2 0 1 3 . 11 0 2 101 APPENDIX C: LEAKAGE ANALYSIS DETAIL 1103 10 2 Ta b l e C - 1 : L e a k a g e An a l y s i s D e t a i l Ba s e l i n e P e r C a p i t a 20 1 3 T o ta l A n n u a l 2013Injection/ Re t a i l S a l e s / E x p e n d i t u r e s Re t a i l S a les a n d S a les P o t e n t i a l i n $00 0 (c) TotalLeakage Es t i m a t e d E s t i m a t e d E s t i m a t e d E s t i m a t e d E s t i m a t e d E s t i m a t e d I n j e c t i o n / a s % o f Sa l e s R e s i d e n t S a l e s R e s i d e n t W o r k e r T o t a l P o t e n t i a l (L e a k a g e ) Potential St o r e C a t e g o r y in Are a (a) Exp e n dit u r e s (b ) in A r e a E x p e n d i t u r e s E x p e n d i t ur e s E x p e n d i t u r e s $ 0 0 0 S a l e s Mo t o r V e h i c l e a n d P a r t s D e a l e r s $1 3 6 $2 , 3 2 4 $ 8 , 1 3 0 $ 1 3 8 , 5 3 5 $0 $ 1 3 8 , 5 3 5 ($ 1 3 0 , 4 0 5 ) - 9 4 % Fu r n i t u r e a n d H o m e F u r n i s h i n g s S t o r e s $2 3 9 $3 5 3 $ 1 4 , 2 2 8 $ 2 1 , 0 3 1 $0 $ 2 1 , 0 3 1 ($6,803)-32% El e c t r o n i c s a n d A p p l i a n c e S t o r e s $2 3 9 $8 1 6 $ 1 4 , 2 2 8 $ 4 8 , 6 5 7 $ 4 , 7 0 0 $ 5 3 , 3 5 7 ($39,130)-73% Bl d g . M a t r l . a n d G a r d e n E q u i p . a n d S u p p l i e s $2 2 2 $1 , 0 6 8 $ 1 3 , 2 1 2 $ 6 3 , 6 4 8 $0 $ 6 3 , 6 4 8 ($50,436)-79% Fo o d a n d B e v e r a g e S t o r e s $2 , 7 7 8 $2 , 4 8 0 $ 1 6 5 , 6 5 3 $ 1 4 7 , 8 5 9 $ 1 1 , 3 0 0 $ 1 5 9 , 1 5 9 $ 6 , 4 9 4 4 % He a l t h a n d P e r s o n a l C a r e S t o r e s $5 8 0 $6 8 7 $ 3 4 , 5 5 3 $ 4 0 , 9 4 1 $ 4 , 0 0 0 $ 4 4 , 9 4 1 ($10,388)-23% Ga s o l i n e S t a t i o n s $8 8 6 $9 1 8 $ 5 2 , 8 4 7 $ 5 4 , 7 5 6 $0 $ 5 4 , 7 5 6 ($1,909)-3% Cl o t h i n g a n d C l o t h i n g A c c e s s o r i e s S t o r e s $6 8 2 $1 , 3 7 2 $ 4 0 , 6 5 1 $ 8 1 , 7 7 2 $ 6 , 0 0 0 $ 8 7 , 7 7 2 ($47,121)-54% Sp o r t i n g G o o d s , H o b b y , B o o k , a n d M u s i c S t o r e s $2 7 3 $3 9 3 $ 1 6 , 2 6 0 $ 2 3 , 4 4 0 $ 1 , 8 0 0 $ 2 5 , 2 4 0 ($8,980)-36% Ge n e r a l M e r c h a n d i s e S t o r e s $2 , 1 4 8 $1 , 7 7 2 $ 1 2 8 , 0 5 1 $ 1 0 5 , 6 6 1 $ 1 7 , 1 0 0 $ 1 2 2 , 7 6 1 $ 5 , 2 9 0 4 % Mi s c e l l a n e o u s S t o r e R e t a i l e r s $3 4 $3 4 7 $ 2 , 0 3 3 $ 2 0 , 6 7 2 $ 5 , 8 0 0 $ 2 6 , 4 7 2 ($24,439)-92% Fo o d S e r v i c e s a n d D r i n k i n g P l a c e s $2 , 2 6 7 $2 , 4 1 0 $ 1 3 5 , 1 6 5 $ 1 4 3 , 6 9 0 $ 1 5 , 1 0 0 $ 1 5 8 , 7 9 0 ($23,625)-15% T o t a l $1 0 , 4 8 3 $ 1 4 , 9 3 9 $ 6 2 5 , 0 1 2 $ 8 9 0 , 6 6 1 $ 6 5 , 8 0 0 $ 9 5 6 , 4 6 1 ($ 3 3 1 , 4 5 0 ) - 3 5 % Re t a i l T r a d e A r e a Ba s e l i n e P e r C a p i t a 20 1 3 T o ta l A n n u a l 2013Injection/ Re t a i l S a l e s / E x p e n d i t u r e s Re t a i l S a les a n d S a les P o t e n t i a l i n $00 0 (c) TotalLeakage Es t i m a t e d E s t i m a t e d E s t i m a t e d E s t i m a t e d E s t i m a t e d E s t i m a t e d I n j e c t i o n / a s % o f Sa l e s R e s i d e n t S a l e s R e s i d e n t W o r k e r T o t a l P o t e n t i a l (L e a k a g e ) Potential St o r e C a t e g o r y in A r e a (a) Ex p e n dit u r e s (b ) in A r e a E x p e n d i t u r e s E x p e n d i t ur e s E x p e n d i t u r e s $ 0 0 0 S a l e s Mo t o r V e h i c l e a n d P a r t s D e a l e r s $3 , 4 2 4 $2 , 4 5 7 $ 2 , 0 0 9 , 7 9 2 $ 1 , 4 4 2 , 28 5 $0 $ 1 , 4 4 2 , 2 8 5 $ 5 6 7 , 5 0 7 3 9 % Fu r n i t u r e a n d H o m e F u r n i s h i n g s S t o r e s $3 1 3 $3 3 2 $ 1 8 3 , 8 2 2 $ 1 9 4 , 9 0 5 $0 $ 1 9 4 , 9 0 5 ($11,083)-6% El e c t r o n i c s a n d A p p l i a n c e S t o r e s $8 2 5 $7 6 4 $ 4 8 4 , 0 6 6 $ 4 4 8 , 1 7 0 ($ 5 , 6 0 0 ) $4 4 2 , 5 7 0 $ 4 1 , 4 9 5 9 % Bl d g . M a t r l . a n d G a r d e n E q u i p . a n d S u p p l i e s $9 9 5 $1 , 0 0 9 $ 5 8 4 , 1 4 7 $ 5 9 2 , 2 0 8 $0 $ 5 9 2 , 2 0 8 ($8,061)-1% Fo o d a n d B e v e r a g e S t o r e s $2 , 6 2 0 $2 , 4 7 1 $ 1 , 5 3 7 , 9 8 1 $ 1 , 4 5 0 , 1 8 8 ($ 1 3 , 4 0 0 ) $1 , 4 3 6 , 7 8 8 $ 1 0 1 , 1 9 3 7 % He a l t h a n d P e r s o n a l C a r e S t o r e s $7 1 7 $6 9 1 $ 4 2 0 , 7 4 9 $ 4 0 5 , 5 1 4 ($ 4 , 7 0 0 ) $4 0 0 , 8 1 4 $ 1 9 , 9 3 5 5 % Ga s o l i n e S t a t i o n s $1 , 1 6 7 $9 4 1 $ 6 8 5 , 2 4 9 $ 5 5 2 , 5 5 6 $0 $ 5 5 2 , 5 5 6 $ 1 3 2 , 6 9 3 2 4 % Cl o t h i n g a n d C l o t h i n g A c c e s s o r i e s S t o r e s $1 , 0 0 2 $1 , 2 8 8 $ 5 8 8 , 2 3 2 $ 7 5 6 , 1 0 3 ($ 7 , 2 0 0 ) $7 4 8 , 9 0 3 ($ 1 6 0 , 6 7 1 ) - 2 1 % Sp o r t i n g G o o d s , H o b b y , B o o k , a n d M u s i c S t o r e s $5 4 6 $3 6 6 $ 3 2 0 , 6 6 8 $ 2 1 5 , 0 8 3 ($ 2 , 2 0 0 ) $2 1 2 , 8 8 3 $ 1 0 7 , 7 8 5 5 1 % Ge n e r a l M e r c h a n d i s e S t o r e s $1 , 5 1 4 $1 , 7 1 5 $ 8 8 8 , 4 7 5 $ 1 , 0 0 6 , 7 8 0 ($ 2 0 , 3 0 0 ) $9 8 6 , 4 8 0 ($98,005)-10% Mi s c e l l a n e o u s S t o r e R e t a i l e r s $4 1 2 $3 4 3 $ 2 4 2 , 0 3 3 $ 2 0 1 , 1 9 6 ($ 6 , 9 0 0 ) $1 9 4 , 2 9 6 $ 4 7 , 7 3 7 2 5 % Fo o d S e r v i c e s a n d D r i n k i n g P l a c e s $2 , 2 7 1 $2 , 3 4 3 $ 1 , 3 3 2 , 7 1 3 $ 1 , 3 7 5 , 3 4 0 ($ 1 8 , 0 0 0 ) $1 , 3 5 7 , 3 4 0 ($24,628)-2% T o t a l $1 5 , 8 0 7 $ 1 4 , 7 2 1 $ 9 , 2 7 7 , 9 2 6 $ 8 , 6 4 0 , 3 2 9 ($ 7 8 , 3 0 0 ) $8 , 5 6 2 , 0 2 9 $ 7 1 5 , 8 9 7 8 % Al l s a l e s a n d l e a k a g e s a r e i n 2 0 1 3 d o l l a r s . (a ) F r o m T a b l e 1 3 . (b ) E s t i m a t e d e x p e n d i t u r e s p e r c a p i t a a r e d e r i v e d f r o m N i e l s e n RM P O p p o r t u n i t y G a p R e p o r t , a d j u s t e d t o a c c o u n t f o r l o c a l e x p e n d it u r e p a t t e r n s i n S a n t a C l a r a Co u n t y . T h e s e l e v e l s o f c o n s u m e r po t e n t i a l a r e a s s u m e d a s a b e n c h m a r k a g a i n s t w h i c h t o c o m p a r e a c t u a l s a l e s . S a l e s a s s u m e d t o b e " l e a k i n g " f r o m t h e a r e a i f t h a t ar e a h a s p e r c a p i t a s a l e s b e l o w b e n c h m a r k s a l e s . P e r c a p i t a s a l e s a r e c a l c u l a t e d b a s e d o n 2 0 1 3 p o p u l a t i o n p e r C A S t a t e D e p t . o f F i n a n c e f o r T o w n a n d N i e l s e n f o r Re t a i l T r a d e A r e a . 20 1 3 C u p e r t i n o P o p u l a t i o n : 5 9 , 6 2 0 20 1 3 R T A P o p u l a t i o n : 5 8 6 , 9 4 6 ( c ) T o t a l s a l e s = S a l e s / e x p e n d i t u r e s p e r c a p i t a t i m e s a r e a p o p u l a t i o n . So u r c e s : C A D e p a r t m e n t o f I n d u s t r i a l R e l a t i o n s ; U . S . B u r e a u of L a b o r S t a t i s t i c s ; U . S . C e n s u s o f R e t a i l T r a d e , 2 0 0 7 ; 2 0 1 1 Z i p C o de a n d C o u n t y B u s i n e s s P a t t e r n s ; Ni e l s e n M a r k e t P l a c e ; B A E , 2 0 1 3 . 11 0 4 103 APPENDIX D: NOTES ON METHODOLOGY FOR RETAIL SALES AND LEAKAGE ESTIMATES BAE has developed point-in-time estimates of retail sales by six-digit NAICS22 category, applying sales per employee data by NAICS from the 2007 Census of Retail Trade to generate estimates of total retail sales by category for 2011 based on Zip Code Business Patterns, the most recent data available at the time of analysis. These estimates have the advantage over estimates based on taxable data in that all retail sales are included, so no adjustment factors are necessary to get from SBOE data to total retail sales. It should be noted that these estimates should be considered as approximate, since the exact employment numbers for each store type are not available; instead, the published data group stores into an employment class size.23 Additional comparisons were made with SBOE data to determine whether it was necessary to reconcile major discrepancies between the Zip Code-derived estimates and the published taxable sales data. It was determined that no adjustments were required; while the estimates from the Zip Code data vary from SBOE figures, these differences are due in large part to the inclusion of nontaxable sales. 22 The North American Industrial Classification System (NAICS) is a federally-directed system for classifying establishments by industry. 23 For example, one store size category in the Zip Code Business Patterns ranges from 25 to 49 employees; estimates are based on a central point in this range, since the exact number of employees is unknown. 1105 104 APPENDIX E: WORKER SPENDING CLOSE TO PLACE OF WORK 1106 10 5 Ta b l e E - 1 : W o r k e r S p e n d i n g C l o s e t o P l a c e o f W o r k Ma j o r R e t a i l C a t e g o r y Avg . P e r We e k , 20 1 1 $ ( a ) Avg . P e r Ye a r , 20 1 1 $ ( b ) Avg . P e r Ye a r , 20 1 3 $ ( c ) Ca t e g o r y f o r E s t i m a t e ( d ) El e c t r o n i c s / P h o n e / C o m p u t e r S t o r e s $ 8 . 9 3 $ 4 2 9 $ 4 4 6 E l e c t r o n i c s a n d A p p l i a n c e S t o r e s Gr o c e r y S t o r e s $ 2 1 . 5 8 $ 1 , 0 3 6 $ 1 , 0 7 9 F o o d a n d B e v e r a g e S t o r e s Dr u g S t o r e s $ 7 . 6 0 $ 3 6 5 $ 3 8 0 H e a l t h a n d P e r s o n a l C a r e S t o r e s Cl o t h i n g S t o r e s $ 4 . 4 3 $ 2 1 3 $ 2 2 1 C l o t h i n g a n d C l o t h i n g A c c e s s o r i e s S t o r e s Sh o e S t o r e s $ 3 . 4 0 $ 1 6 3 $ 1 7 0 C l o t h i n g a n d C l o t h i n g A c c e s s o r i e s S t o r e s Je w e l r y S t o r e s $ 3 . 7 5 $ 1 8 0 $ 1 8 7 C l o t h i n g a n d C l o t h i n g A c c e s s o r i e s S t o r e s Sp o r t i n g G o o d s S t o r e s $ 3 . 4 9 $ 1 6 8 $ 1 7 4 S p o r t i n g G o o d s , H o b b y , B o o k , a n d M u s i c S t o r e s De p a r t m e n t S t o r e s $ 9 . 0 3 $ 4 3 3 $ 4 5 1 G e n e r a l M e r c h a n d i s e S t o r e s Di s c o u n t S t o r e s $ 1 1 . 3 3 $ 5 4 4 $ 5 6 6 G e n e r a l M e r c h a n d i s e S t o r e s W a r e h o u s e C l u b s $ 1 2 . 3 2 $ 5 9 1 $ 6 1 6 G e n e r a l M e r c h a n d i s e S t o r e s Of f i c e S u p p l i e s / S t a t i o n e r y / N o v e l t y G i f t s a n d C a r d s $ 7 . 4 1 $ 3 5 6 $ 3 7 0 M i s c e l l a n e o u s S t o r e R e t a i l e r s Ot h e r G o o d s ( f l o r i s t , n o n - f o o d v e n d o r s , e t c . ) $ 3 . 7 5 $ 1 8 0 $ 1 8 7 M i s c e l l a n e o u s S t o r e R e t a i l e r s Fu l l - S e r v i c e R e s t a u r a n t s $ 1 3 . 0 6 $ 6 2 7 $ 6 5 3 F o o d S e r v i c e s a n d D r i n k i n g P l a c e s Fa s t F o o d / D e l i / L u n c h E a t e r i e s $ 1 5 . 8 0 $7 5 8 $7 9 0 Fo o d S e r v i c e s a n d D r i n k i n g P l a c e s To t a l $ 1 2 5 . 8 8 $ 6 , 0 4 2 $ 6 , 2 9 2 No t e s : (a ) E s t i m a t e o f w o r k e r p o t e n t i a l e x p e n d i t u r e s b a s e d o n Of f i c e - W o r k e r R e t a i l S p e n d i n g i n t h e D i g i t a l A g e ( I C S C , 2 0 1 2 ) . (b ) A s s u m e s w o r k w e e k s p e r y e a r = 4 8 t o a c c o u n t f o r v a c a t i o n , s i c k t i m e , a n d o t h e r a b s e n c e s . (c ) S u r v e y c o n d u c t e d i n 2 0 1 1 . I n f l a t e d t o 2 0 1 3 d o l l a r s u s i n g t h e U S C o n s u m e r P r i c e I n d e x f o r A l l U r b a n C o n s u m e r s , w i t h i n f l a t i o n i n 2 0 1 3 a s s u m e d t o co n t i n u e a t t h e r a t e f r o m J a n u a r y t h r o u g h M a y . In f l a t i o n f a c t o r = 1 . 0 4 1 2 7 So u r c e s : I n t e r n a t i o n a l C o u n c i l o f S h o p p i n g C e n t e r s ( I C SC ) ; U . S . B u r e a u o f L a b o r S t a t i s t i c s ; B A E , 2 0 1 3 . 11 0 7 106 APPENDIX F: NET RETAIL EXPENDITURES NEAR WORK FOR CUPERTINO WORKERS Table F-1: Net Retail Expenditures Near Work for Cupertino Workers Annual Potential Worker Expenditures Near Work (a) Major Retail Category Cupertino RTA Motor Vehicle and Parts Dealers $0 $0 Furniture and Home Furnishings Stores $0 $0 Electronics and Appliance Stores $4,700,000 ($5,600,000) Bldg. Matrl. and Garden Equip. and Supplies $0 $0 Food and Beverage Stores $11,300,000 ($13,400,000) Health and Personal Care Stores $4,000,000 ($4,700,000) Gasoline Stations $0 Clothing and Clothing Accessories Stores $6,000,000 ($7,200,000) Sporting Goods, Hobby, Book, and Music Stores$1,800,000 ($2,200,000) General Merchandise Stores $17,100,000 ($20,300,000) Miscellaneous Store Retailers $5,800,000 ($6,900,000) Food Services and Drinking Places $15,100,000 ($18,000,000) Net Potential Worker Retail Expenditures$65,800,000 ($78,300,000) Notes: (a) Estimate of worker potential expenditures based on Office-Worker Retail Spending in the Digital Age (ICSC, 2012) as shown in Appendix E. Total worker expenditures based on per worker data is multiplied by the estimated net inflow of workers into Cupertino. Numbers rounded to nearest hundred thousand. Net inflows of workers is used since worker expenditures for the number of workers up to the number of working residents would already be accounted for by the expenditures of those working residents in the resident demand analysis. Net inflow of workers into Cupertino = 10,440 Net inflow of workers into Retail Trade Area = -12,449 Based on U.S. Census Bureau's OnTheMap Application and LEHD Origin-Destination Employment Statistics (Beginning of Quarter Employment, 2nd Quarter of 2002-2011). Sources: U.S. Census Bureau Longitudinal Employer-Household Dynamics (LEHD); International Council of Shopping Centers (ICSC); BAE, 2013. 1108 107 APPENDIX G: CURRENTLY LEASING PROPERTIES 1109 10 8 Ta b l e G - 1 : C u r r e n t l y L e a s i n g O f f i c e P r o p e r t i e s , C u p e r t i n o , J u n e 2 0 1 3 To t a l S i z e Na m e / A d d r e s s S p a c e f o r L e a s e M i n D i v i s i b l e St o r i e s / Y e a r B u i l t Vac a n c y R a t e Ma x C o n t i g u o u s A s k i n g R e n t L e a s e T y p e D e t a i l s Cu p e r t i n o C i t y C e n t e r 35 0 , 0 0 0 t o t a l s q . f t . 8 , 2 0 1 s q . f t . m i n . $4 . 0 0 / s f / m o N N N Ad d i t i o n a l s p a c e s w i l l b e 20 4 0 0 - 2 0 4 5 0 S t e v e n s C r e e k B l v d 8, 2 0 1 s q . f t . a v a i l a b l e 8 , 2 0 1 s q . f t . m a x . Ad d i t i o n a l a v a i l a b l e i n J u l y 2 0 1 3 , S e p t 8 s t o r i e s / B u i l t 1 9 9 0 2% v a c a n t 1 s p a c e a v a i l a b l e ex p e n s e s : 2 0 1 3 , & J a n 2 0 1 4 a n d a r e $1 . 0 0 / s f / m o c u r r e n t l y a d v e r t i s e d . Cu p e r t i n o F i n a n c i a l C e n t e r 47 , 0 0 0 t o t a l s q . f t . $4 . 5 0 / s f / m o F u l l S e r v i c e 10 0 8 0 W o l f e R d 90 8 s q . f t . a v a i l a b l e 3 s t o r i e s / B u i l t 1 9 7 2 2% v a c a n t St e v e n s C r e e k O f f i c e C e n t e r 10 8 , 0 0 0 t o t a l s q . f t . 8 4 5 s q . f t . m i n . $ 3 . 5 0 / s f / m o F u l l s e r v i c e C l a s s B P r o p e r t y 20 8 6 3 S t e v e n s C r e e k B l v d 3, 8 7 3 s q . f t . a v a i l a b l e 3 , 0 2 8 s q . f t . m a x . Bu i l t 1 9 7 5 4% v a c a n t 2 s p a c e s a v a i l a b l e 21 6 8 5 G r e n a d a A v e 2, 0 8 0 t o t a l s q . f t . $2 . 2 5 / s f / m o Cl a s s B p r o p e r t y . L i s t e d a s 2 s t o r i e s / B u i l t 1 9 8 6 2, 0 8 0 s q . ft . a v a i l a b l e re t a i l a n d o f f i c e . 10 0 % v a c a n t Cu p e r t i n o M a r k e t p l a c e 62 5 s q . f t . m i n . $ 2 . 7 5 t o N N N Of f i c e s p a c e l o c a t e d i n m i x e d - 19 6 2 0 - 1 9 7 8 0 S t e v e n s C r e e k B l v d 21 , 3 9 1 s q . f t . a v a i l a b l e 5 , 8 7 7 s q . f t . m a x . $ 3 . 7 5 / s f / m o A d d i t i o n a l u s e p r o p e r t y w i t h o f f i c e a n d 2 s t o r i e s 5 s p a c e s a v a i l a b l e ex p e n s e s : r e t a i l . A s k i n g r e n t f o r s p a c e $0 . 7 2 / s f / m o o n g r o u n d f l o o r i s $ 3 . 7 5 . As k i n g r e n t f o r s p a c e o n 2 n d fl o o r i s $ 2 . 7 5 . Co n t i n u e d o n f o l l o w i n g p a g e . 11 1 0 10 9 Ta b l e G - 1 : C u r r e n t l y L e a s i n g O f f i c e P r o p e r t i e s , C u p e r t i n o , J u n e 2 0 1 3 ( c o n t i n u e d ) To t a l S i z e Na m e / A d d r e s s S p a c e f o r L e a s e M i n D i v i s i b l e St o r i e s / Y e a r B u i l t Vac a n c y R a t e Ma x C o n t i g u o u s A s k i n g R e n t L e a s e T y p e D e t a i l s Ar b o r P r o f e s s i o n a l C e n t e r 20 , 0 0 0 t o t a l s q . f t . 4 6 4 s q . f t . m i n . $ 2 . 2 5 / s f / m o F u l l S e r v i c e C l a s s B p r o p e r t y 20 0 4 5 / 2 0 0 6 5 S t e v e n s C r e e k B l v d 46 4 s q . f t . a v a i l a b l e 4 6 4 s q . f t . m a x . 2 s t o r i e s / B u i l t 1 9 8 5 2% va c a n t 1 s p a c e a v a i l a b l e Bi m a r k B u i l d i n g 10 , 0 0 0 t o t a l s q . f t . 1 , 0 5 3 s q . f t . m i n . $ 2 . 5 0 / s f / m o F u l l S e r v i c e C l a s s B p r o p e r t y 21 7 6 0 S t e v e n s C r e e k B l v d 1, 0 5 3 s q . f t . a v a i l a b l e 1 , 0 5 3 s q . f t . m a x . 2 s t o r i e s / B u i l t 1 9 8 5 11 % va c a n t 1 s p a c e a v a i l a b l e Cu p e r t i n o C o r p o r a t e S q u a r e 19 , 8 6 2 t o t a l s q . f t . 6 4 6 s q . f t . m i n . $ 2 . 2 5 / s f / m o M o d i f i e d g r o s s C l a s s B p r o p e r t y 10 0 6 2 M i l l e r A v e 3, 6 4 1 s q . f t . a v a i l a b l e 2 , 9 9 5 s q . f t . m a x . 2 s t o r i e s / B u i l t 1 9 8 0 18 % v a ca n t 2 s p a c e s a v a i l a b l e 19 4 5 0 S t e v e n s C r e e k B l v d 12 , 3 4 4 t o t a l s q . f t . 8 9 9 s q . f t . m i n . $ 2 . 7 5 / s f / m o M o d i f i e d g r o s s C l a s s A p r o p e r t y 2 s t o r i e s 2, 5 4 0 s q . f t . a v a i l a b l e 1 , 6 4 1 s q . f t . m a x . 21 % v a c a n t 2 s p a c e s a v a i l a b l e 21 0 4 0 H o m e s t e a d R d 6, 5 5 0 t o t a l s q . f t . 1 , 0 6 7 s q . f t . m i n . $ 2 . 7 5 t o F u l l S e r v i c e B u i l d i n g h a s t h r e e s p a c e s 2 s t o r i e s / B u i l t 1 9 7 9 3, 2 0 2 sq . f t . a v a i l a b l e 3 , 3 0 2 s q . f t . m a x . $ 1 . 9 5 /s f / m o av a i l l a b l e t h a t c a n b e c o m b i n i e d 49 % v a c a n t 3 s p a c e s a v a i l a b l e to f o r m o n e s p a c e . Co n t i n u e d o n f o l l o w i n g p a g e . 11 1 1 11 0 Ta b l e G - 1 : C u r r e n t l y L e a s i n g O f f i c e P r o p e r t i e s , C u p e r t i n o , J u n e 2 0 1 3 ( c o n t i n u e d ) To t a l S i z e Na m e / A d d r e s s S p a c e f o r L e a s e M i n D i v i s i b l e St o r i e s / Y e a r B u i l t Vac a n c y R a t e Ma x C o n t i g u o u s A s k i n g R e n t L e a s e T y p e D e t a i l s Cu p e r t i n o C o r p o r a t e C e n t e r 77 , 3 0 2 t o t a l s q . f t . 4 , 0 6 6 s q . f t . m i n . $ 2 . 7 5 / s f / m o F u l l S e r v i c e 16 0 1 D e A n z a B l v d 4, 0 6 6 s q . f t . a v a i l a b l e 4 , 0 6 6 s q . f t . m a x . 2 s t o r i e s 5% v a c a n t 1 s p a c e a v a i l a b l e 10 0 5 5 M i l l e r A v e 10 0 , 0 0 4 t o t a l s q . f t . 2 , 0 3 0 s q . f t . m i n . $ 2 . 4 0 / s f / m o M o d i f i e d g r o s s C l a s s B p r o p e r t y 2 s t o r i e s / B u i l t 1 9 8 6 2, 0 3 0 s q . f t . a v a i l a b l e 2 , 0 3 0 s q . f t . m a x . 2% v a c a n t 1 s p a c e a v a i l a b l e 10 0 5 4 P a s a d e n a A v e 2, 0 7 4 s q . f t . a v a i l a b l e 2 , 0 7 4 s q . f t . m i n . $ 2 . 1 0 / s f / m o F u l l S e r v i c e C l a s s B p r o p e r t y . M i x e d - u s e 2, 0 7 4 s q . f t . m a x . bu i l d in g w i t h c o m m e r c i a l o n 1 s p a c e a v a i l a b l e gr o u n d f l o o r a n d r e s i d e n t i a l ab o v e . So u r c e s : L o o p n e t , 2 0 1 3 ; B A E , 2 0 1 3 11 1 2 11 1 Ta b l e G - 2 : C u r r e n t l y L e a s i n g R e t a il P r o p e r t i e s , C u p e r t i n o , J u n e 2 0 1 3 To t a l S i z e Na m e / A d d r e s s S p a c e f o r L e a s e M i n D i v i s i b l e St o r i e s / Y e a r B u i l t Vac a n c y R a t e As k i n g R e n t M a x C o n t i g u o u s L e a s e T y p e D e t a i l s Cu p e r t i n o M a r k e t p l a c e 21 , 3 9 1 s q . f t . a v a i l a b l e $ 2 . 7 5 t o 6 2 5 s q . f t . m i n . N N N R e t a i l s p a c e l o c a t e d i n m i x e d - 19 6 2 0 - 1 9 7 8 0 S t e v e n s C r e e k B l v d $3 . 7 5 / s f / m o 5 , 8 7 7 s q . f t . m a x . A d d i t i o n a l u s e p r o p e r t y w i t h o f f i c e a n d 2 s t o r i e s 5 s p a c e s a v a i l a b l e e x p e n s e s : r e t a i l . A s k i n g r e n t f o r s p a c e $0 . 7 2 / s f / m o o n g r o u n d f l o o r i s $ 3 . 7 5 . As k i n g r e n t f o r s p a c e o n 2 n d fl o o r i s $ 2 . 7 5 . 21 6 8 5 G r e n a d a A v e 2, 0 8 0 t o t a l s q . f t . $ 2 . 2 5 / s f / m o Cl a s s B p r o p e r t y . L i s t e d a s 2 s t o r i e s / B u i l t 1 9 8 6 2, 0 8 0 s q . f t . a v a i l a b l e re t a i l o r o f f i c e , b u t m o r e 10 0 % v a c a n t su i t a b l e f o r o f f i c e u s e s . 10 0 8 8 N W o l f e R d 63 , 8 8 3 t o t a l s q . f t . $ 4 . 2 5 t o 8 0 0 s q . f t . m i n . N N N R e t a i l s p a c e i n a m i x e d - u s e Un d e r C o n s t r u c t i o n 63 , 8 8 3 s q . f t . a v a i l a b l e $ 4 . 7 5 / s f / m o 1 3 , 0 0 0 s q . f t . m a x . de v e l o p m e n t c u r r e n t l y u n d e r 10 0 % v a c a n t 11 s p a c e s a v a i l a b l e co n s t r u c t i o n . 20 8 0 3 S t e v e n s C r e e k B l v d 15 , 0 0 0 t o t a l s q . f t . $ 4 . 0 0 / s f / m o 1 , 5 0 0 s q . f t . m i n . N N N R e t a i l s t r i p c e n t e r c u r r e n t l y 1 s t o r y / U n d e r C o n s t r u c t i o n 1 5 , 0 0 0 s q . f t . a v a i l a b l e 5, 0 0 0 s q . f t . m a x . un d e r c o n s t r u c t i o n . 10 0 % v a c a n t 1 s p a c e a v a i l a b l e 10 0 6 5 S t e v e n s C r e e k B l v d 38 , 2 3 0 t o t a l s q . f t . $ 1 . 5 0 / s f / m o Mo d i f i e d R e t a i l s t r i p c e n t e r 4, 1 5 0 s q . f t . a v a i l a b l e gr o s s 11 % v a c a n t De A n z a P l a z a 4, 7 2 3 s q . f t . a v a i l a b l e $ 2 . 5 0 / s f / m o 1 , 7 7 1 s q . f t . m i n . N N N R e t a i l s t r i p c e n t e r 10 5 5 5 S D e A n z a B l v d 10 , 0 0 0 s q . f t . m a x . 3 s p a c e s a v a i l a b l e Co n t i n u e d o n f o l l o w i n g p a g e . 11 1 3 11 2 Ta b l e G - 2 : C u r r e n t l y L e a s i n g R e t a i l P r o p e r t i e s , C u p e r t i n o , J u n e 2 0 1 3 ( c o n t i n u e d ) To t a l S i z e Na m e / A d d r e s s S p a c e f o r L e a s e M i n D i v i s i b l e St o r i e s / Y e a r B u i l t Vac a n c y R a t e As k i n g R e n t M a x C o n t i g u o u s L e a s e T y p e D e t a i l s Mo n t e b e l l o R e t a i l 7, 3 4 6 t o t a l s q . f t . $ 1 . 7 5 / s f / m o 1 s p a c e a v ai l a b l e N N N G r o u n d - f l oo r r e t a i l s p a c e i n 20 4 8 8 S t e v e n s C r e e k B l v d 1, 5 0 6 s q . f t . a v a i l a b l e mi x ed - u s e b u i l d i n g w i t h r e t a i l 1 s t o r y / B u i l t 2 0 0 5 21 % v a c a n t an d r e s i d e n t i a l . Ho m e s t e a d S q u a r e 20 0 , 0 0 0 t o t a l s q . f t . $ 2 . 5 0 t o 1 , 5 0 0 s q . f t . m i n . N N N C o m m u n i t y s h o p p i n g c e n t e r . 20 5 8 0 - 2 1 2 3 0 H o m e s t e a d R d 20 0 , 0 0 0 s q . f t . a v a i l a b l e $ 4 . 5 0 / s f / m o 5 5 , 0 0 0 s q . f t . m a x . Cu r r e n t l y u n d e r c o n s t r u c t i o n . 1 s t o r y / B u i l t 1 9 7 6 10 0 % v a c a n t As k i n g r e n t s f r o m $ 2 . 5 0 f o r an c h o r s p a c e , $ 4 . 5 0 f o r s h o p sp a c e . 20 1 4 9 S t e v e n s C r e e k B l v d 15 , 1 0 0 t o t a l s q . f t . $ 3 . 1 3 / s f / m o NN N S h o w r o o m s p a c e w i t h r o l l u p 1 s t o r y / B u i l t 1 9 5 7 9, 6 0 0 s q . f t . a v a i l a b l e do o r . 5 , 6 0 0 s q . f t . o f w a r e h o u s e 64 % v a c a n t in r e a r . Me t r o p o l i t a n a t C u p e r t i n o 1, 2 7 8 s q . f t . a v a i l a b l e $ 2 . 9 5 / s f / m o NN N R e t a i l s p a c e i n m i x e d u s e 19 5 0 1 - 1 9 5 0 5 S t e v e n s C r e e k B l v d de v e l o p m e n t w i t h r e t a i l a n d ho u s i n g . 20 5 5 8 S t e v e n s C r e e k B l v d 20 0 , 0 0 0 t o t a l s q . f t . $ 2 . 2 5 / s f / m o 1 s p a c e a v a i l a b l e N N N S u b l e a s e - e x p i r e s D e c 2 0 1 9 . Bu i l t 1 9 5 9 20 , 9 0 1 s q . f t . a v a i l a b l e 10 % v a c a n t Tr a v i g n e P l a z a 1, 2 0 0 s q . f t . a v a i l a b l e $ 2 . 2 5 / s f / m o 1 s p a c e a v a i l a b l e N N N R e t a i l s p a c e i n m i x e d - u s e 19 9 2 9 S t e v e n s C r e e k B l v d bu i l d i n g w i t h 2 o f f i c e s u p s t a i r s , 2 s t o r i e s / B u i l t 2 0 0 3 5 r e t a i l b u s i n e s s e s o n g r o u n d fl o o r . I n c l u d e s e x c l u s i v e u s e o f ou t d o o r p a t i o . Co n t i n u e d o n f o l l o w i n g p a g e . 11 1 4 11 3 Ta b l e G - 2 : C u r r e n t l y L e a s i n g R e t a i l P r o p e r t i e s , C u p e r t i n o , J u n e 2 0 1 3 ( c o n t i n u e d ) To t a l S i z e Na m e / A d d r e s s S p a c e f o r L e a s e M i n D i v i s i b l e St o r i e s / Y e a r B u i l t Vac a n c y R a t e As k i n g R e n t M a x C o n t i g u o u s L e a s e T y p e D e t a i l s Cu p e r t i n o C r o s s r o a d s 20 , 0 0 0 t o t a l s q . f t . $ 2 . 5 0 / s f / m o 1 s p a c e a v ai l a b l e N N N R e t a i l s p a c e i n s t r i p c e n t e r . 20 6 3 0 S t e v e n s C r e e k B l v d 4, 0 0 0 s q . f t . a v a i l a b l e A d d i t i o n a l 20 % v a c a n t e x p e n s e s : $0 . 2 5 / s f / m o 20 2 7 9 S t e v e n s C r e e k B l v d 9, 5 0 7 t o t a l s q . f t . $ 4 . 0 0 / s f / m o 1 s p a c e a v a i l a b l e N N N D a y s p a , c h i r o p r a c t o r o f f i c e , 1 s t o r y / B u i l t 1 9 8 0 1, 2 8 0 s q . f t . a v a i l a b l e ac u p u n t u r e o f f i c e , o r s i m i l a r u s e 13 % v a c a n t in a n e i g h b o r h o o d c e n t e r . Cu p e r t i n o V i l l a g e 23 , 8 8 9 t o t a l s q . f t . 2, 9 9 9 s q . f t . m i n . N N N D a y s p a , c h i r o p r a c t o r o f f i c e , 10 9 4 5 N W o l f e R d 6, 6 4 1 s q . f t . a v a i l a b l e 3, 6 4 2 s q . f t . m a x . ac u p u n t u r e o f f i c e , o r s i m i l a r u s e 2 s t o r i e s / B u i l t 1 9 6 8 28 % v a c a n t 2 s p a c e s a v a i l a b l e in a n e i g h b o r h o o d c e n t e r . Ma i n S t r e e t C u p e r t i n o 10 0 , 0 0 0 t o t a l s q . f t . Pr o j e c t i s c u r r e n t l y u n d e r 10 0 , 0 0 0 s q . f t . a v a i l a b l e co n s t r u c t i o n . 10 0 % v a c a n t So u r c e s : L o o p n e t , 2 0 1 3 ; B A E , 2 0 1 3 11 1 5 114 APPENDIX H: PLANNED AND PROPOSED DEVELOPMENT IN CUPERTINO 1116 115 Table H-1: Planned and Proposed Development, Cupertino, May 2013 (Revised January 2014) Project Location Site Size Developer (acres)Size (sq. ft.)Comments Under Construction Apple Cafeteria 0.8824,000sq. ft. new retailCafeteria and underground parking for Apple 20625 Alves Dr.4,000 sq. ft. retail demoemployees. Apple, Inc.20,000net new retail sq. ft. Homestead Square 15196,622sq. ft. new retailNew commercial space in an existing shopping 20620/20580/20680 Homestead Rd.95,666 sq. ft. retail democenter. Project includes a Rite-Aid pharmacy Sobrato Development Co.100,956net new retail sq. ft.with drive through. Biltmore Adjacency 1380new residential unitsMixed-use development with 80 rental 20030 Stevens Creek Blvd 7,000sq. ft. new retailresidential units and 7,000 sq. ft. of commercial Prometheus Real Estate Group 21,000sq. ft. retail demospace. Rose Bowl 19800 Vallco Pkwy 59,827sq. ft. new retailMixed-use development with 204 residential 204new residential unitsrental units, 59,827 sq. ft. of retail space. Cupertino Village 12.524,455sq. ft. new retailTwo new one-story retail buildings and a SWC of Wolfe Rd & Homestead Rd two-level parking structure. No building Kimco Realty permits submitted. Entitlement expires 11/01/2013. Main Street Cupertino 18.5130,500sq. ft. new retailMixed-use development with retail, office, N side of Stevens Creek Blvd b/t 180new hotel roomshotel, and rental residential units with a Finch Ave & Tantau Ave 260,000sq. ft. new office five-level parking garage with two levels of Ken Rodrigues and Partner, Inc.120new residential unitsunderground parking. No building permit submitted. Entitlement expires 5/15/2015. Approved (Construction Not Yet Commenced) Tantau Retail and Parking Garage 9.410,582sq. ft. new retailNew retail building and one-level parking 10100 N. Tantau Ave garage on an existing office site. No building Chang Architecture & Planning permits have been issued. Entitlements expire 8/21/2015. Saich Way Station 15,650sq. ft. new retailApproved by City Council in Feb. 2013. No NWC of Saich Way &11,640 sq. ft. retail demobuilding permits have been submitted. Stevens Creek Blvd.4,010net new retail sq. ft. The Oaks Shopping Center 8.1122new hotel roomsMixed-use development with four-story, 21255-21275 Stevens Creek Blvd 18,731sq. ft. new retail (a)122-room hotel and three-story, 56,194-sq. ft. Sand Hill Properties, Inc.18,731sq. ft. new office (a)retail/office/ convention center over 2,430sq. ft. retail demounderground podium parking. Demolition of 15,263sq. ft. theater demoexisting theater and retail space. Entitlement expires 9/02/2014. 1 Results Way 19.8155,000sq. ft. new officeDemolition of five buildings and construction NWC Bubb Rd and McClellan Rd 139,632 sq. ft. office demoof three new 2-story office buildings and a Embarcadero Capital Partners, LLC 15,368net new office sq. ft.2-level parking garage. No building permit submitted. Entitlement expires 7/21/2014. Apple Campus 2 1753,400,000sq. ft. new officeNew office campus for Apple, Inc. Phase I N. Wolfe Rd, E. Homested Rd, 2,650,000 sq. ft. office demoincludes 2.82 million sq. ft. of office and N. Tantau Ave, I-280 750,000net new office sq. ft.amenity space, a 1,000-seat suditorium, a Apple, Inc.corporate gymnasium, a parking structure and an onsite energy generation facility. Phase II includes 600,000 sq. ft. of office and research facilities. Environmental review in progress. Continued on following page. 1117 116 Table H-1: Planned and Proposed Development, Cupertino, May 2014 (Revised January 2014;continued) Project Location Site Size Developer (acres)Size (sq. ft.)Comments Pending Approval Parkside Trails 918new residential units18 new single family homes on 9 acres. The E side of Stevens Canyon Rd S of Ricardo Rd project includes dedication of 33.5 acres Parkside Trails LLC adjacent to the project site as open space. Summary Total New Residential Planned and Proposed (units)422 Total Residential Units Proposed for Demolition:0 Net New Planned and Proposed Residential (units)422 Total New Office Planned and Proposed (sq. ft.)3,833,731 Total Office Proposed for Demolition:2,789,632 Net New Planned and Proposed Office (Sq. Ft.)1,044,099 Total New Retail Planned and Proposed (sq. ft.)487,367 Total Retail Proposed for Demolition:134,736 Net New Planned and Proposed Retail (Sq. Ft.)352,631 Total New Lodging Planned and Proposed (# of Rooms)302 Total Lodging Proposed for Demolition:0 Net New Planned and Proposed Lodging (# of Rooms)302 Note: (a) The Oaks Shopping Center project would include 56,194 square feet of retail/office/convention center space. The square footage of 1118 1 Retail Strategy Report March 6, 2014 Prepared by 1119 1 Table of Contents Executive  Summary  and  Findings  ........................................................................................  4   BAE  Reports  and  Implications  for  General  Plan  Amendment  ..............................................  4   Commodity/Specialty;  Active/Non-­‐active  ...................................................................................  4   Study  Areas  ............................................................................................................................................  5   Vallco  Study  Area  .................................................................................................................................  6   Purpose  and  Background  of  Report  ....................................................................................  8   Review  of  Accompanying  Studies  .......................................................................................  10   BAE  Market  Study  ..............................................................................................................................  10   BAE  Sales  Leakage  Points  ................................................................................................................  12   Implications  for  General  Plan  Amendment  ...............................................................................  14   History,  Methodology  and  Key  Retail  Terminology  .....................................................  16   History  ...................................................................................................................................................................  16   Commodity  and  Specialty  Retail  .................................................................................................................  17   Active  and  Inactive  Uses  ................................................................................................................................  18   Gravity  Side  of  the  Trade  Area  ....................................................................................................................  19   Omnichannel  Retail  ..........................................................................................................................................  19   Lifestyle  and  Hybrid  Centers  .......................................................................................................................  21   Summary  and  Analysis  of  Study  Areas  .............................................................................  22   Study  Area  #1  –  Cupertino  Inn  and  Goodyear  Tire  .................................................................  23   Real  Estate  Evaluation  ....................................................................................................................................  24   Retail  Market  Evaluation  ...............................................................................................................................  24   Site  Evaluation  ....................................................................................................................................................  25   Place-­‐making  Considerations  ......................................................................................................................  25   Stakeholder  Feedback  .....................................................................................................................................  25   Study  Area  #2  –  City  Center  ............................................................................................................  25   Real  Estate  Evaluation  ....................................................................................................................................  27   Retail  Market  Evaluation  ...............................................................................................................................  27   Site  Evaluation  ....................................................................................................................................................  27   Place-­‐making  Considerations  ......................................................................................................................  28   Functionality  Evaluation  ................................................................................................................................  28   Study  Area  #3  –  Pacific  Gas  and  Electric  Company  (PG&E)  ..................................................  28   Study  Area  #4  –  Mirapath  ................................................................................................................  28   Real  Estate  Evaluation  ....................................................................................................................................  29   Retail  Market  Evaluation  ...............................................................................................................................  29   Site  Evaluation  ....................................................................................................................................................  30   Study  Area  #5  –  Cupertino  Village  ................................................................................................  30   1120 2 Real  Estate  Evaluation  ....................................................................................................................................  32   Retail  Market  Evaluation  ...............................................................................................................................  32   Site  Evaluation  ....................................................................................................................................................  32   Site  Plan  Recommendations  .........................................................................................................................  32   Place-­‐making  Considerations  ......................................................................................................................  33   Functionality  Evaluation  ................................................................................................................................  33   Study  Area  #6  –  Vallco  Shopping  Mall  .........................................................................................  33   Study  Area  #7  –  Stevens  Creek  Office  Center  ............................................................................  33   Real  Estate  Evaluation  ....................................................................................................................................  34   Retail  Market  Evaluation  ...............................................................................................................................  34   Site  Evaluation  ....................................................................................................................................................  35   Place-­‐making  Considerations  ......................................................................................................................  36   Functionality  Evaluation  ................................................................................................................................  36   Continuity  of  Place  Evaluation  ....................................................................................................................  36   Vallco  Shopping  Mall  ..............................................................................................................  38   Background  and  History  ..................................................................................................................  39   Real  Estate  Attributes  .......................................................................................................................  39   Fundamental  Site  Attributes  ..........................................................................................................  40   Land  Use  Designations,  Zoning  and  Land  Use  Policies  .....................................................................  40   Competitive  Landscape  ....................................................................................................................  42   Valley  Fair,  San  Jose/Santa  Clara  ...............................................................................................................  42   Santana  Row,  San  Jose  ....................................................................................................................................  43   Westgate  Center,  San  Jose  .............................................................................................................................  43   Sunnyvale  Town  Center,  Sunnyvale  ..........................................................................................................  44   Stanford  Shopping  Center,  Palo  Alto  ........................................................................................................  45   Vallco  Site  Area  ...................................................................................................................................  46   Vallco  Leasing  Makeup  .....................................................................................................................  47   Development,  Ownership,  and  Repositioning  History  ..........................................................  48   Ground  Lease  Discussion  .................................................................................................................  51   Title  Review  Discussion  ...................................................................................................................  51   Master  Ground  Lease  for  Mall  Development  ........................................................................................  51   Construction  Operating  Restrictions  Easements  Agreement  (COREA)  ....................................  52   First  Amendment  to  COREA  .........................................................................................................................  52   Second  Amendment  to  COREA  ....................................................................................................................  52   Third  Amendment  to  COREA  .......................................................................................................................  52   Fourth  Amendment  to  COREA  .....................................................................................................................  52   Fifth  Amendment  to  COREA  .........................................................................................................................  52   Sears  Documents  ...............................................................................................................................................  52   Development  Agreement  ...............................................................................................................................  53   1121 3 General  Plan  Amendment  ..............................................................................................................................  53   Tenant  Leases  .....................................................................................................................................................  54   Stakeholder  Interviews  and  Discussion  –  Anchor  Tenants  .................................................  54   Macy’s  .....................................................................................................................................................................  54   Sears  .......................................................................................................................................................................  56   JC  Penney  ..............................................................................................................................................................  57   The  Bay  Club  .......................................................................................................................................................  58   Stakeholder  Interviews  and  Discussion  –  Rose  Bowl  ............................................................  58   Stakeholder  Interviews  and  Discussion-­‐  Other  .......................................................................  59   Strategies  for  Repositioning  Vallco  Shopping  Mall  .................................................................  62   Literature  Review  .............................................................................................................................................  62   Retrofitting  Suburbs:  Instant  Cities,  Instant  Architecture,  and  Incremental   Metropolitanism  ................................................................................................................................................  63   Converting  Obsolete  Malls  ............................................................................................................................  64   Analogous  Redevelopment  Projects  .........................................................................................................  65   Vallco  Repositioning  Alternatives  ................................................................................................  70   Repositioning  Scenario  1:  An  ideal  mix  appealing  to  Cupertino  and  extended  trade  area   customers  without  regard  to  entitlement  or  site  constraints  .......................................................  71   Repositioning  Scenario  2:  Assume  market  factors  such  as  competing  projects  and  legal   limitations  such  as  those  contained  in  the  COREA  and  land  use  regulations  .........................  80   Non-­‐Vallco  Related  Stakeholder  Interview  Feedback  .................................................  86   Recommendations  ...................................................................................................................  89   Bibliography  ..............................................................................................................................  92   1122 4 EXECUTIVE SUMMARY AND FINDINGS Cupertino is an affluent community with a bifurcated retail sector: Daily needs and some commodity categories perform well while other categories perform poorly or not at all. Overall, the City leaks sales to the overall Trade Area, probably more as a result of being bested by more aggressive economic development and better-executed development elsewhere than by any fundamental flaw such as the City’s location in the Trade Area, transportation issues, or demographics. Cupertino is centrally located in the west portion of the Santa Clara Valley, commonly known as Silicon Valley. The City is well served by road infrastructure; however, there exist few regional mass transit options. There are significant barriers to entry such as lack of available land to build new retail projects in Cupertino. Careful consideration should be given to the planning and redevelopment or repositioning of existing retail projects, and to how retail might be added to existing or new mixed-use projects. Careful consideration should also be given to whether a retail development or retail component of a mixed-use development should be designed and positioned as a “commodity” or a “specialty” project. The City appears to have adequate commodity shopping alternatives within its borders. For example, Target, Safeway, Whole Foods, Ranch 99 (2), Walgreen’s, CVS, Sears, Michaels, Home Goods, TJ Maxx, Party City, and Aaron Brothers operate within the City’s borders. Barriers to entry contribute to robust sales for many of these stores. Focusing on redeveloping existing retail stores with robust sales (e.g. Target) may be interesting as a planning exercise but unrealistic from a purely economic perspective, particularly with an owner-user. BAE Reports and Implications for General Plan Amendment The City expects population to increase by 5,000 and job growth by 7,000 by 2040. Both residents and workers have higher wages than the County or the State. The City’s ethnic makeup has evolved so that over 63% of the resident population is of Asian descent. There are few good entry-housing opportunities in the City for younger members of the workforce, and few amenities that would incentivize these workers to live in Cupertino. In the defined Trade Area, there is little leakage or injection of retail sales. On a per-capita basis, the City’s retail sales underperform as compared with the County and the State. Some categories, like general merchandise, perform well while others, such as electronics and fashion, underperform. Any opportunity to increase retail sales in Cupertino would likely be at the expense of sales happening elsewhere in the Trade Area. Commodity/Specialty; Active/Non-active As the United States became more auto dependent, downtown shopping districts gave way to suburban shopping including enclosed malls. 1123 5 Department stores gave up market share to big boxes, and consequently the number of viable malls contracted. The best model for illustrating how retail organizes itself today is by contrasting commodity retailers, where consumers based their purchasing decisions on price and convenience from specialty retailers, where consumers choose to spend their discretionary income during their discretionary time. The latter is particularly affected by the retailer’s environment. The advent of the so-called lifestyle center was driven by a trend in which small specialty retailers faced a shortage of high quality specialty retail space at the same moment that regional mall failures were accelerating. When designing retail environments, creating active, interactive environments where the consumer is engaged by businesses even when passing by, as opposed to inactive environments where the consumer does not interact with businesses, is of key importance. The trend towards “omnichannel” continues. This trend is characterized by retailers creating a seamless shopping experience regardless of whether consumers are shopping online, from portable devices, from catalogs, or in a store. Study Areas Presently, there are a number of Study Areas being considered for redevelopment. Of these, not all are well-suited for retail development. Additionally, for those that are well-suited for development, retail is not necessarily the highest and best use.. The best retail application for the Cupertino Inn/Goodyear Study Area is service retail (examples might include a cleaner or cell phone store), and foodservice, which serves the adjacent hotel and creates a synergistic use adjacent to the Homestead Square Shopping Center. Except for retail supporting the office tenants (e.g. sandwich shop or sundry store), the City Center Study Area is not well suited for retail development, and entitlements for office uses are presently being contemplated. The PG&E and Mirapath Study Areas might be developable with a big box anchoring the site, however, the site is not well located for retail development, and mitigations in excess of those typically required, for traffic and noise in particular, would be expected due to the site’s location away from a major intersection, freeway interchange, and close to housing. Cupertino Village already has entitlements for redevelopment of the site as a denser shopping center. This repositioning of the Study Area seems well thought out and appropriate. A change of use to residential, while possibly yielding a higher residual land value, would not necessarily be in the best interest of the immediate area since neither is there another daily- needs shopping area in the immediate vicinity nor are there many projects in Cupertino with so- called “lifestyle” components. 1124 6 The Stevens Creek Office Center could be redeveloped as a retail project, however, there are other options that might be higher and better uses. The creation of cross access with an adjacent site is a positive development for both properties Other sites in the City were not included in the scope of work for this Report, but are worthy of evaluation. The Oaks, at the intersection of Stevens Creek and Route 85 and across the street from De Anza College, is one example of a site well positioned for redevelopment, perhaps as a retail-residential mixed-use project. Vallco Study Area The Vallco Shopping Mall is centrally located in the City. The property, which is zoned for regional commercial uses and was originally developed in the 1970’s, consists of 14 parcels and contains a 1.3 million square foot mall anchored by Macy’s, Sears, JC Penny, and AMC Theaters. The property has been remodeled several times since it was built. Despite being the largest retail project in the City, the Mall is largely vacant, save for the anchor tenants who continue to perform well. According to stakeholders, Vallco represents not only one of the best-located properties in the City, but also one of the City’s largest redevelopment opportunities, and challenges. Governing documents control what can be changed on the property, including parking, building requirements, and certain uses. Ground leases and various tenant leases have provisions further restricting changes and certain uses. The Mall operates in a competitive environment with successful project to the north (Stanford Shopping Center), east (Valley Fair and Santana Row), and south (Westgate Shopping Center). All of the anchor tenants state their stores perform well despite the Mall having a low occupancy rate, and their commitment to the Trade Area. All of the anchor tenants say they are receptive to redevelopment plans that might improve the project. There is an oversupply of mall space in the United States; Vallco’s circumstances are not unique. Key to the repositioning process is creating a brand that sets Vallco apart from competing projects and communicating that brand to the community and prospective tenants alike. An owner or developer with the expertise and financial capability to execute such a strategy is required for a successful outcome. The City’s ability to contribute financially and/or to use its governmental powers to facilitate redevelopment will have a material impact on the success and timing of any redevelopment. There are examples of similarly situated projects that have been successfully repositioned, including in California. An ideal redevelopment alternative that is not limited in its scope by ownership interests, controlling documents, or leases would likely see the existing project demolished entirely and replaced with a mixed-use project. In the alternative, a scenario that does recognize these limiting factors would more likely result in a mixed-use project with less density and a larger retail component. 1125 7 Several adjacent projects are planned or under construction. The adjacent Rose Bowl project is under construction, and the owner expects to receive competitive rents for the 60,000 square feet of retail space. Main Street is entitled and being marketed for lease, but grading has only just begun. The Apple Campus 2 is approved, with construction expected to start soon. 1126 8 PURPOSE AND BACKGROUND OF REPORT In August 2012, the City Council initiated a process to have City staff and the community identify options for replenishing citywide office, commercial (retail) and hotel development allocations in order to meet economic development goals. During this time, the City was contacted by several property owners, including some within the Vallco Shopping District, who inquired about potential General Plan amendments for their sites. In order to comprehensively evaluate citywide needs and individual sites, the City Council decided in early 2013 to combine these efforts into a single General Plan Amendment project. A General Plan is a regulatory document that sets the “ground rules” for conserving resources, designing new projects, expanding public services, and improving community amenities. Every city in California is required to adopt and regularly update a General Plan. It functions as the City’s primary regulatory document and must be used as the basis for all planning-related decisions. While this project will consider citywide land use, urban design, mobility, and economic topics, it is not a rewrite of the City’s 2005 General Plan. Rather, this project is focused on identifying and analyzing potential changes within seven key study areas (identified in the Summary and Analysis of Study Areas section), and possible changes to urban design and mobility policies particularly along five major corridors in the City. The City has established several important goals for this project: • Goal 1: Involve the community in a comprehensive discussion on mobility, urban design, and economic development challenges facing Cupertino. • Goal 2: Identify and analyze potential increases to commercial (retail), office, mixed-use and hotel development allocations within the study areas. • Goal 3: Enhance and improve the overall commercial experience in Cupertino by retaining existing business and attracting new companies. • Goal 4: Revitalize the Vallco Shopping District so it becomes a cohesive, vibrant shopping and entertainment destination that serves both the region and the local community. • Goal 5: Protect and enhance Cupertino’s quality of life so the city remains a desirable place to live, work, recreate and raise a family. • Goal 6: Revise existing General Plan policies and diagrams as they relate to the goals listed above, and make some additional minor changes to address recent State and regional requirements. As part of the City’s overall growth management system, Cupertino’s General Plan establishes a development allocation system for commercial (retail), office, hotel room and residential growth. This Retail Strategy Report (the “RSR” or “Report”) will address each Study Area’s suitability specifically for retail development, and thereby help inform any decisions made regarding the various allocations noted above as well as some of the design 1127 9 principles discussed in the September 2013 Settings and Opportunities Report prepared as a part of this project. Particular attention will be paid to the centerpiece of the South Vallco Master Plan Area: The Vallco Shopping Mall. While this Report is not intended to update the South Vallco Master Plan, it will touch on some of the key goals illuminated in that Plan including: • Revitalizing the South Vallco Master Plan area, • Coordinating aesthetic improvements, • Connecting individual properties, • Optimizing roadway infrastructure, and • Promoting a unique identity for the area. As part of the General Plan Amendment process, BAE Urban Economics developed a Market Study,which contains a Retail Sales and Leakage Analysis. The market study analyzes future demand for retail, office, hotel, and housing over the coming 20-25 years. The retail sales and leakage analysis identifies sectors where the City might have an opportunity to capture more sales locally from its residents and employees (while possibly attracting shoppers from nearby areas). Below is a summary of the key findings from both studies. This summary will help provide context for this Report. 1128 10 REVIEW OF ACCOMPANYING STUDIES BAE Market Study The BAE Market Study identifies a number of attributes that provide important context for this Report. Consider the following: • ABAG’s One Bay Area Plan indicates that Cupertino will gain almost 5,000 households and over 7,000 jobs between 2010 and 2040. Cupertino has a strong housing market due largely to the high quality of local schools as well as proximity to well-paying high-tech jobs. The median price for Cupertino homes changed very little between 2009 and 2011, but increased significantly in 2012 to $1,045,750, higher than pre-recession levels and twice as high as the median for Santa Clara County with virtually no low- or moderately-priced options, and a steady rental market. The shortage of young adult residents and workers in Cupertino could be largely the result of the lack of moderately priced housing options for many young or single- earner households, which suggests a need for smaller, more affordable units that can serve as workforce housing. • On a per capita basis, Cupertino’s annual retail sales for 2011 are $10,483, compared to $13,404 for Santa Clara County, and $12,493 for California. • The City’s household composition is weighted towards family households with children and has a correspondingly larger household size than the overall trade area. • Cupertino differs markedly from the County and region with respect to racial and ethnic breakdown. The City’s Asian population comprised 63.1 percent of total population in 2010. By contrast, just under 35 percent of daytime workers are of Asian descent. • Reflecting high education levels and professional occupations, Cupertino households earn a significantly higher median household income ($123,700) than Santa Clara County ($87,200), and the Bay Area ($75,800). Cupertino residents’ high level of educational attainment correlates positively with a high degree of professional occupations concentrated in management, business, science, and arts as compared with Santa Clara County or the Bay Area. As a result of the higher percentage of management, business, science, and arts occupations, the median earnings of those working in Cupertino (as opposed to those living in Cupertino) is $81,000, again higher than Santa Clara County overall. • Office demand continues to be strong, limited primarily by supply constraints and Apple’s demand for office space. 1129 11 Anticipated office job growth of 49,000 jobs in the west portion of Silicon Valley (the area including Cupertino) will generate demand for approximately 12 million square feet of new office space between 2010 and 2040. There is significant potential for the City to attract an additional corporate campus to accommodate an existing major employer or to attract a new major employer Office workers and consequently office tenants more and more demonstrate a preference for working environments that offer urban-style amenities as opposed to traditional suburban office parks, and for green certified buildings. Proximity to public transportation, bicycle and pedestrian access, attractive retail offerings, and entertainment options are also important amenities. Office design trends that encourage employee interaction has resulted in more open building interiors and consequently greater employee density on a per square foot basis. • Business-related travel is the driver of demand for hotel rooms in Silicon Valley. Exceptionally strong occupancy and growth in room revenue in Cupertino’s existing hotels suggest support for additional hotel rooms. There are five hotels in Cupertino with a total of 785 rooms. The City’s hotel development pipeline totals 302 rooms in two projects located at the Oaks Shopping Center and within the Main Street project respectively, the 122 room entitlement at The Oaks being due to expire in September, 2014. The City’s resident and workforce populations are distinct beyond the income and ethnicity differences noted above. For example, Apple is competing with Google, Facebook, LinkedIn and others for talent. To the extent that these workers are younger (as is often the case), there is a greater demand for a more urban environment. The City’s retail “outflow” can be seen most notably in per-capita sales as compared with the County. Looking at the various Study Areas with an eye to future retail needs is important. A retail offering tailored to better meet the needs of citizens (both those presently living in Cupertino and likely future residents, i.e. knowledge workers) will be instrumental if the City hopes to recapture some of the sales leakage. Vallco will be the City’s single greatest opportunity to draw retail dollars to Cupertino. While the present retail allocation for Cupertino is projected to be adequate to meet the retail needs of today’s residents and projected population growth, developing an overall retail strategy as a stated economic development goal will inform that allocation and enhance the City’s ability to create retail facilities capable of meeting the City’s future needs and meeting any stated goal of recapture leaking sales. 1130 12 BAE Sales Leakage Points The BAE Retail Sales and Leakage Analysis identifies important spending patterns in the City as well as the defined trade area used for the study. The defined “Trade Area” is shown on the following map: Consider the following findings: • A broad array of retail shopping options are available in nearby communities and are easily accessible to Cupertino residents. The leakage analysis shows that city boundaries do not represent a constraint on Cupertino residents shopping elsewhere or non- residents shopping in Cupertino. The fact that less than eight percent of potential sales from trade area customers were occurring outside of the Trade Area indicates that the overall retail trade area is well balanced with respect to retail. • With respect to specific categories: o Cupertino has relatively strong sales in stores selling such as the general merchandise category which includes businesses that sell everyday items. Another reason this category is performing well is the presence of three mall department stores and one discount department store whose sales are included. It should be noted that two Trader Joe’s and two Safeway stores are 1131 13 located just outside the City limits, but that a new Safeway will be opening within the City shortly. By contrast, stores specializing in other types of comparison goods are lacking in the City. With the exception of the Vallco Shopping Mall, which has its own challenges, most of the retail in the City serves daily needs and convenience- oriented shoppers. o There are also no major electronics or appliance stores such as Best Buy or Fry’s in Cupertino, although Sears (in the general merchandise store category) carries a large variety of appliances and may capture a larger share of resident expenditures that would otherwise occur in stores dedicated to electronics and appliances. o The lack of clothing and apparel-related stores is due in part to the lack of fashion-driven, destination retail centers in Cupertino. The exception may be Vallco Shopping Center, however, Vallco has suffered from competition with Valley Fair and other projects, leading to high vacancy and shoppers on apparel-driven trips turning to destinations outside Cupertino. • The BAE Retail Sales and Leakage Analysis suggests that a strong regional retail environment in the overall Trade Area constrains opportunities for additional capture of resident spending through new retail development in Cupertino itself. While it is true that over the entire Trade Area there is not significant leakage, we believe that Cupertino’s central location within the Trade Area as well as access to freeways and major arterials creates the opportunity to introduce new retailers to the City, and perhaps even to capture sales presently leaking out of the City to other parts of the Trade Area. • Cupertino has more jobs than employed residents, leading to a net inflow of workers (31% of people employed in Cupertino live in San Jose, 16% live in Cupertino, and 34% elsewhere in Santa Clara County). This daily inflow creates a significant opportunity for well-located properties in Cupertino to be positioned as destination-oriented retail development. • In contrast to the City itself, a smaller number of persons work in the Trade Area than the total number of employed residents. Because the Trade Area’s leakage is minimal, people living outside the Trade Area must be shopping in the Trade Area. • Daytime workers generate demand for purchases near their workplace, especially meals eaten during the workday. Additional daytime or to/from work shopping opportunities are created when shopping alternatives are near to or on the path of travel to/from workplaces. Due to the balanced overall Trade Area, some of the new sales needed to support new retail development would need to be retained in the City, instead of occurring elsewhere in the Trade Area. Since this process depends on shifting spending patterns and providing store types targeted to local demographics, BAE provided estimates in a range of “low” and “high.” The 1132 14 “low” estimate assumes modest additional recapture of leaking sales, while the “high” assumes a shift in spending patterns with well-located and well-merchandised new store types. Summary of Demand Estimates LowHigh Through 2020 Demand Through 2020 (Units/Sq.Ft.)NANA Demand Adjustments (a)NANA Less: Entitled Projects NANA Net Demand NANA Through 2035 Demand Through 2035 (Units/Sq.Ft.)334,000521,000 Demand Adjustments (a)- - Less: Entitled Projects 176,000176,000 Net Demand 158,000345,000 Notes: Sources: City of Cupertino; BAE 2013. Retail Implications for General Plan Amendment Making “high altitude” decisions about the amount and character of retail development and redevelopment opportunities in Cupertino over the coming years is a primary goal of this General Plan update process. By way of background, there are eight projects with a retail component that are under construction, approved, or planned in Cupertino. These projects, summarized in Table H-1 of BAE’s Market Study, will bring a total of approximately 352,600 net new square feet of retail to the City. The Study recommends that the following should be considered: • Cupertino’s strong demographics (e.g. families with high incomes and education levels) constitute a strong base of potential support for renovated or new retail facilities. • The City has relatively few younger households and singles, indicating potential support for smaller residential units (both for-sale and rental). The development of this sort of housing stock, attracting younger residents, would shift retail demand. • Retail in Cupertino must cater to a more diverse base of customers than reflected by the City resident profile alone. • The highly compensated workforce that provides a potential strong base of demand for housing closer to work and for retail sales during the workday is somewhat tempered by onsite food service and other amenities offered by major employers such as Apple. The leakage study draws an empirical conclusion that if stores in categories leaking sales were to be opened, those sales could be recaptured in the City. The degree to which this can be 1133 15 achieved will depend on competitive factors and availability of real estate with the correct location and site attributes for these particular sorts of stores. From an empirical perspective, the market analysis suggests that there is no additional need for increased retail allocations beyond the existing 701,500 square feet to meet potential demand during the planning period. However, the Vallco Shopping Center represents additional available square feet of existing retail that could redeveloped or re-allocated (depending on how it is redeveloped) to support efforts to attract additional retailers to Cupertino and increase the City’s share of retail sales within the Retail Trade Area. The Retail Sales and Leakage Analysis also comments that: “(n)one of the shopping centers in Cupertino are ‘lifestyle’ centers, although Cupertino Village, The Oaks, and Vallco Shopping Center have certain elements of “lifestyle” retail. This newer type of retail, which combines upscale, specialty retail, dining, and entertainment in one shopping experience, has recently been developed elsewhere in the Bay Area.” Exemplified by Santana Row in San Jose and Bay Street in Emeryville, the Main Street project planned for Cupertino appears intended add a similar type of experience to the City’s retail inventory.” With respect to Vallco specifically, the Mall represents a mixed picture for Cupertino: Its anchor department stores and entertainment options appear to draw shoppers to the City, but the poor performance of the remainder of the Mall contributes to Cupertino’s weakness in comparison goods shopping and destination retail. Vallco is the City’s greatest potential redevelopment opportunity with implications for recapturing leaking retail sales, and creating a so-called lifestyle or mixed-use environment. Vallco will be addressed in greater detail later in this Report. The purpose of this Report is to comment on how the various study areas might be positioned or redeveloped to attract new and to retain existing retail in the City, notwithstanding the proposed or in-development projects listed above. It should be noted that an impression could be created that Vallco alone could recover retail sales that might be leaking from Cupertino. In its present form, Vallco is not a viable retail project. Additionally, competitive market forces and infrastructure are not taken into consideration in this empirical analysis. Alternatives to Vallco’s present condition are discussed later in this Report. 1134 16 HISTORY, METHODOLOGY AND KEY RETAIL TERMINOLOGY History By way of background, a brief history of how retail has evolved over the past century will provide context for this Report and its findings. In the early 20th century, cars were a rarity. Most towns and cities had downtown districts that served as the community’s commercial hub and were characterized by a massing of retail that evolved to serve the community’s needs. Towns often had their own homegrown department stores that sold a wide variety of goods. The best known examples of these include Emporium and May Co. on the West Coast, Dayton’s and Marshall Field in the Midwest, and Filene’s and Macy’s in the Northeast. These were department stores in the truest sense, having separate departments under one roof for a variety of goods including clothing and shoes, electronics, housewares, books and records, pets, home goods, and the like. When retail was clustered in a downtown or town square environment, there was not a need for today’s ubiquitous suburban shopping center. In contrast, by the 1950’s, the automobile became commonplace, and started a trend towards suburbanization. The need for shopping centers was born. Over a period of time, these malls replaced downtown shopping districts in the increasingly decentralized urban landscape. As the advent of shopping malls began to erode the downtown shopping district’s market share, discounters began to erode the traditional department store’s market share. Wal-Mart and K-Mart started nationwide expansions. Even traditional department store companies began to enter this world, perhaps the most notable example being Dayton-Hudson’s Target division. At the same time, the suburban regional mall would often be anchored by department store chains that expanded their market share by focusing on suburbs. The next step in the evolution away from traditional department stores was the advent of retailers who became more efficient by specializing in a particular “department.” Clustered together in what have come to be known as power centers, these “big box” and “category killer” stores were more convenient, focused narrowly on one category, but offered a wide variety of merchandise within that category, developed supply and distribution advantages extending from their narrower focus, and offered everyday low prices. They also started killing off the departments in the department stores. In-turn, department stores increased their focus on soft goods, thereby limiting the overall variety of merchandise and giving the consumer fewer reasons to visit. Like with many businesses, department store chains began to consolidate in order to increase scale, decrease expenses, and maintain competitiveness … or simply to avoid going out of business all together. By extension, the number and variety of regional mall anchor tenants contracted, and by the 1990’s the contraction and consolidation trend of regional malls was in full swing. In some instances, even traditional department stores (Kohl’s being one example) began to abandon malls and join the category killers in power centers. With fewer anchors, so- called “category killer” tenants finding each other in power centers, and the advent of the 1135 17 exurb, fewer and fewer truly successful regional malls and even fewer downtown shopping districts remained. Some department stores including Macy’s, Sears, and JC Penney have evolved away from their all-things-under-one-roof model to more closely resemble commodity retailers. In other words, their product offerings are less distinguishable from what could be purchased in a variety of other places and through a variety of retail channels. Furthermore, with the exception of chains such as Nordstrom, Bloomingdale’s, Neiman Marcus and the like, department stores have ceased to distinguish themselves for their service and environment. With the homogenization of department stores has come the demise of many regional malls. Certainly, there are many high-performing malls including Valley Fair in San Jose and Stanford Shopping Center in Palo Alto. There are far more that are similar to Vallco or nearby Westgate Shopping Center that have fallen by the wayside. As retail has evolved to today’s commodity versus specialty norm, some of these will be revitalized or redeveloped altogether while others will not. [1] Commodity and Specialty Retail As downtown shopping districts and regional malls declined, and big box, category killer retailers proliferated, today’s “commodity” versus “specialty” paradigm was born. [2] At it’s essence, today’s environment is about convenience and price versus experience. Commodity retail goods and services are those goods and services that are purchased and consumed on a regular basis from "primary" household funds, largely without emotional attachment by the consumer, and at retailers and retail shopping centers offering the consumer the combination of low price and convenience most suited to the consumer’s needs at a particular moment. Examples of commodity retailers include local convenience stores to drug stores, grocery stores, discounters and warehouse stores. A "commodity shopping center’s" primary purpose is the aggregation of a number of commodity retailers in one location, allowing for convenient cross-shopping. While habits may be developed over time (eg. shopping at the same grocery store), consumers’ tend to view these retailers as interchangeable and do not to have a strong connection to a commodity retailer’s brand or to a commodity shopping venue. For the most part, internet shopping is an option most consistent with purchasing commodity goods and services (see more in the discussion of omnichannel retail below). 1136 18 Specialty retail goods and services, by contrast, are those goods and services that are purchased on an optional basis by consumers using "discretionary funds” (ie. funds not designated for basics like rent, food, and transportation), and selected and often consumed during “free” or “discretionary” time (ie. when not working or tending to daily responsibilities). Successful specialty shopping venues deliver a unique and attractive combination of tenant mix and environment (ie. a sense of place), often reflecting the character of consumers in the market or trade area in which they operate. Equally as important, these specialty shopping areas lend themselves to extended consumer stays. An emotional "feeling" or “pleasure” derived from the overall shopping "experience” is an important part of the consumer’s point of reference. Successful specialty shopping venues, regardless of format, deliver a unique combination of "product" (ie. shops) and “place” (ie. physical and conceptual environment), unique and attractive to the consumer within the market or trade area in question. The term “comparison goods,” which are goods that consumers do not purchase on a frequent basis (ie. daily or weekly), and are more likely to cause consumers to compare price, quality, and features than everyday items is often used interchangeably with “commodity” goods. Shoppers are often willing to travel a greater distance to patronize destination retailers. Commodity and specialty retailers, and shopping districts and malls can fit the definition of “destination” retail. The distinction lies in the intent or desire to spend more time shopping to better understand the product or choice of products as opposed to specialty retail, which is specifically limited to instances where the shopping experience and environment are key, and quite likely involve an entertainment or dining component. The distinction may also be nuanced: For example, in the case of Whole Foods, the Apple Store, or Bass Pro sporting goods, each sells commodities, however, the product and brand positioning, merchandising strategies, and environment or “theater” are specialty in nature. Active and Inactive Uses Another important way to think about retail is in terms of active and inactive uses. “Active uses” refers to situations where shoppers or pedestrians interact with built spaces even if they don’t go inside to buy a good or service. Examples would include specialty retailers, restaurants, some grocery or drug stores, and even a karate studio, art gallery, or real estate agency. 1137 19 By contrast “inactive uses” refer to situations where the flow of a retail district is broken so there is a significant gap or in some other manner so that pedestrians don’t interact with the built environment. Even active uses with limited hours may become inactive uses when they close and become “dark” during non-business hours. Examples include offices, medical facilities, auto repair, big box stores without outward-facing interactive displays (e.g. Costco, some supermarkets and drug stores, some big-box retailers). Inactive uses can also be created through poor design. Gravity Side of the Trade Area The “gravity side of the trade area” is defined as the general direction in the trade area from which residents and daytime workers enter the trade area and to which they travel in order to leave the area. From an operational definition perspective, much if not most retail goods and services in Cupertino are located along Stevens Creek Blvd. and on the streets providing access to I-280. The intersections of these streets are particularly important (eg. Stevens Creek and Wolfe, and Stevens Creek and De Anza). This means that the “gravity side” of the trade area in Cupertino can generally be defined as the area running along Stevens Creek between Wolfe and Stelling, and along Wolfe and De Anza between Stevens Creek and Homestead Road. Omnichannel Retail Retail is now conducted through many channels (eg. traditional stores, catalogs, on-line, via mobile devices, television, etc.). Omnichannel retail refers to the trend where the consumer experience across these multiple retail channels is made seamless and consistent. 1138 20 Omnichannel consumers frequently use more than one channel simultaneously. For example, a consumer might do research using a price check app or looking up product reviews while looking at a product in a traditional retail store. Likewise, omnichannel retailers will track customers across the various channels they utilize (catalog and on-line shopping, or on-line and mobile shopping for example) increasing sale opportunities and more precisely targeting marketing. Social media provides an opportunity to build relationships with consumers by constructing a detailed customer profile and capitalizing on merchandising and advertising initiatives. “Simply put, it’s the notion that consumers use more than one channel (web, catalog, mobile, store) to make a purchase. The idea reflects the fact that consumers don’t see channels, they seek solutions: either a retailer satisfies a need or it doesn’t. Increasingly, consumers use the digital channels to make a purchase decision even if that purchase is ultimately completed in a store. “An omni-channel go-to-market model is an idea whose time has come, at least according to Macy’s Chairman, CEO, and President Terry Lundgren, who recently stated on the National Retail Federation’s blog: ‘We talk a lot at Macy’s about omnichannel retailing. Our customer is multi-dimensional. She is busy at work and out with friends. She always has her mobile device in her hand. She’s active on Facebook and Twitter and YouTube and a dozen other social media sites… We want that customer to be able to interact with Macy’s no matter where she is or how she shops. It makes no difference to us whether she buys something in our store or online… or whether she is shopping from her desktop computer or her Droid or her iPad. Macy’s best customers are those who shop us in-stores and online. We have a whole series of strategies in place to drive our store customers to the Web, and our online customer to the stores…Today’s customer is not monolithic. And that’s the way we are approaching our customer.’” [3] A November, 2012 “Shopping Centers Today” article summarizes omnichannel nicely: “The idea is to favor no single retail channel (brick-and-mortar, mobile phone, catalogs) but instead to sell things to people whenever, wherever and however they want. Omnichannel retail is about providing a uniform experience and top-notch service in every exchange with the customer.” The article goes on that distribution channels that once operated separately (ie. something ordered from a catalog or online would be delivered to a customer’s house), are merging so that real estate is now part of the picture (ie. something ordered may be picked up the same or the next day at a local outlet). [4] Omnichannel strategies work differently for commodity as opposed to specialty retailers. For example, multiple retail channels might be used by a consumer to research and assist in purchasing a particular commodity like a television, or to push out or target a promotion. By contrast, a specialty retailer might use onnichannel strategies to drive customer traffic to a bricks-and-mortar store, restaurant, or shopping district. Applicable to both commodity and specialty retailers, the availability and use of multiple retail channels allow consumers to be better informed. A byproduct of this better educated consumer is retail salespeople’s product and competitor knowledge must match this better-informed consumer. Today’s retail environment is challenging. Deborah Weinswig, a Citibank retail analyst, points out that omnichannel retail also creates retailer-landlord opportunities by combining the touch and feel of the brick-and-mortar experience with the excitement and impulse factor of 1139 21 web/mobile shopping (eg. tweet/food trucks, crowdsourcing). She goes on to point out that retailers’ response to “tech titans” like Amazon have been insufficient when measured by retailers having more than three times the sales of the tech titans, but half the market cap, half the net income, and one fifth the cash. While the tech titans are schooling retailers and gaining mindshare, brick-and-mortar retailers are fighting back. For example, Kohl’s was the first to fully allocate costs to its online business, getting a clearer picture of the profitability of its online business. Kohl’s also uses analytics to identify the stores that will be most profitable for “ship- from-store” and “same-day delivery,” possibly from as few as 100 of Kohl’s 1,100+ stores. When interviewed for this study, the Macy’s real estate director pointed out that Macy’s is investing heavily in its web presence. L ifestyle and Hybrid Centers With respect to so-called lifestyle and hybrid commodity-specialty projects, ULI’s Professional Real Estate Development manual states: “Early lifestyle centers successfully combined desirable retail shops with appealing architecture and a variety of outdoor settings spawning the lifestyle center. [… ] These early centers were, in part driven by a trend in which small specialty retailers faced a shortage of high quality specialty retail space at the same moment that regional mall failures were accelerating. The dominant new commodity retail and shopping center formats had, in fact, left small store specialty retailers with few reliable anchors, and, developers with no clearly defined shopping center template to replicate, spawning the ill-defined and somewhat chaotic lifestyle center concept. Most malls failed to function as places conducive to social interaction and connection to community […] Roy Higgs noted a ‘Need to create a powerful and different sense of place. This is especially true of mixed-use developments where, very often, it is the space between the buildings that requires more design attention.’” The same text notes that hybrid commodity-specialty projects “…are generally a risky option for a shopping center developer because the elements of price and convenience that underlie optimal commodity shopping center development generally weaken the elements of better product and place-making essential to well-executed specialty retail centers. Likewise, the higher costs and place-making principles central to specialty retail, degrade the price/convenience equation essential to commodity retailers.” [5] 1140 22 SUMMARY AND ANALYSIS OF STUDY AREAS The general plan amendment, sometimes called a GPA, will focus on identifying land use, economic development, and urban design changes for seven study areas, shown on the following map: The study areas together comprise 121.12 acres and contain approximately 1.9 million square feet of existing commercial improvements, 126 hotel rooms, and 423 residential units. The study areas range in size from approximately one acre (the Mirapath site study area) to over 60 acres (the Vallco Shopping District study area). Each study area is located east of Highway 85 in areas with existing commercial or office development, mostly adjacent to high volume traffic corridors: Stevens Creek Boulevard, Interstate 280, and Homestead Road. Most of these sites are developed with existing uses. While complete demolition and redevelopment of these sites is one possible approach, new development facilitated by the GPA could also consist of either redevelopment of existing buildings, selective demolition of existing structures and replacement with new construction, or new infill development adjacent to existing uses. Detailed descriptions of the study areas presented in the September, 2013 “Settings and Opportunities Report” are augmented here with an analysis and discussion of each site’s utility and the steps necessary to implement successful retail development or redevelopment. 1141 23 Study Area #1 – Cupertino Inn and Goodyear Tire The Cupertino Inn and the Goodyear Tire study area, comprised of two parcels totaling 3.21 acres, includes both the Cupertino Inn and the Goodyear Tire store located at the northwest corner of I-280 and De Anza Boulevard, both owned by John Vidovich. The Cupertino Inn is a full service boutique business hotel that offers 125 rooms as well as event facilities. The Goodyear Tire store is an auto service center offering tire, oil change and other automotive care services. The study area is adjacent to the Homestead Square Shopping Center that is being redeveloped with a 24-hour Safeway as the anchor tenant. The site is effectively already a mixed-use site by virtue of having adjacent hospitality and retail components. The location adjacent to a major arterial and a freeway on-ramp makes it less desirable for residential development. From a retail potential perspective, the site is more notable for adjacent retail redevelopment than it is as a redevelopment site in and of itself. The adjacent 15-acre Homestead Square Shopping Center is presently being redeveloped. The boxes are fully leased to Safeway at 55,000 square feet (planned opening April, 2014), Ross 22,000 square feet, Michaels 25,000 square feet, Steinmart 32,000 square feet, ULTA 13,000 square feet, and FedEx 6,000 square feet. Chase Bank will occupy a 5,000 square foot pad, and there will be 12,000 square feet of shops. A 17,000 square foot Rite Aid pharmacy is open and operating, and most of the other tenants will take possession in the 1st quarter of 2014. A site plan follows. Ownership feels the site is unique as it is one of the last power center development opportunities in the Valley with all surface parking. 1142 24 The same owner owns the adjacent property occupied by a Goodyear retail outlet. Goodyear’s lease will not be renewed, and an application for this project is expected to be submitted to the City for review. The Goodyear parcel is intended for redevelopment as a 10 to 11-story hotel project with ground floor retail that is expected to act as an amenity for the hotel, and potentially additional hotel rooms as well as a conference center. There is a reciprocal access agreement between Vidovich and Homestead Square Shopping Center presently being redeveloped by its owner, the Sobrato Organization. This agreement does not impose any use restrictions upon the Study Area parcels. Real Estate Evaluation The study area is tucked into the corner of North De Anza Boulevard and I-280 without direct access, making it a destination as opposed to a convenience-oriented site from a retail perspective. Access to and from the site and circulation between the Study Area and Homestead Square Shopping Center is limited to the established reciprocal rights with the adjacent projects. Since there is a lack of retail space and land for development of additional retail space in the immediate area, especially north of I-280 and continuing to El Camino Real, this barrier to entry makes this Study Area more viable for retail development than it would be in an easier to build environment. Retail Market Evaluation Given the limited retail development opportunities in the area discussed above, and adjacency to what will be one of the two dominant retail projects in Cupertino located north of I-280, the Study Area has good long-term prospects for continued operation as a retail development. Service and food uses that serve the hotel’s clientele may act as a bridge between the Study Area and Homestead Square. Potential uses consistent with creating this “bridge” might include full-service sit-down restaurants, service uses such as cleaners, salon or spa, or a fitness studio. If the study area were to be developed more intensely, for example with a 10-11 story 1143 25 hotel with a meeting center, the need for convenience retail, restaurants, and service uses would be even more acute. In the case, a clearly-marked, appealing, and safe path-of-travel between the study area and adjacent Homestead Square Shopping Center, and the inclusion of both sit-down and convenience restaurant and service uses in particular should be encouraged. Site Evaluation The only access to/from the subject site is from southbound De Anza; no northbound access is available because of an unbroken median on De Anza. Additional access through adjacent Homestead Square is established by a reciprocal access agreement. Circulation via Celeste Court is restricted by the locked gate between the Cupertino Inn and the adjacent self-storage facility and apartment complex. Parking appears to be adequate for existing uses, however, no plans were available for review in connection with any planned redevelopment of the Goodyear Tire site. Place-making Considerations Given present uses and the project's de facto location behind the primary retail project, uses are placed on the Study Area as well and as functionally as could be as expected. No plans were available for review for any planned redevelopment of the Goodyear Tire site. The hotel has public meeting and gathering areas and a pool area within its facility. Project monument signage is deteriorating and inconspicuous due to being obscured by landscaping. Overall, the facility is dated. Stakeholder Feedback The owner’s representative is desirous of adding density for redevelopment of the hotel as a taller building with additional amenities such as a rooftop bar/lounge. If no additional hotel allocation were to be made as part of this process, the existing hotels in the City would continue to enjoy an artificial cap on room supply, and, by extension, higher room rates resulting from the constrained supply of rooms. Study Area #2 – City Center This Study Area, located along Steven’s Creek Boulevard between Torre Avenue and De Anza Boulevard, is comprised of eight parcels totaling 12.51 acres and encompasses the City Center Towers, private open space, City Center Apartments, Park Center Apartments, and surface (240 stalls) and structured (3 levels down and 2 levels up) parking facilities. This mixed-use development includes a variety of components including residential, office, commercial and retail space. The City Center study area incorporates a mix of uses ranging from office to residential with a small amount of retail that principally serves tenants within and near the Study Area. The various uses include the City Center Towers (169,400 square feet of office space) with some ancillary retail uses (approximately 7,000 square feet not including Apple’s cafeteria which is located just outside the Study Area boundary), Cupertino Park, City Center Apartments (99 units), Park Center Apartments (120 units), and surface and structured parking. Adjacent uses are also mixed residential and commercial, including the Kimpton Cypress Hotel (224 rooms) and Cali Mill Plaza that offers café style outdoor seating, and additional Apple leased office space. 1144 26 Prometheus, the owner, has a conceptual proposal for the redevelopment of the surface parking lot adjacent to the office towers into a 400,000 square foot 10-story office building with 4 levels of below-grade parking and an additional 4 levels of parking to the existing parking garage. No additional retail is anticipated as a part of those plans, although there could be some service-retail depending on tenant needs. Any parking afforded to any retail would need to be in structures, further reinforcing that any retail would be limited as a tenant amenity. The 7,000 square feet of existing retail that is immediately adjacent to, although outside of the Study Area defined above, will remain. 1145 27 Real Estate Evaluation The Study Area is located on Stevens Creek Boulevard between South De Anza Boulevard and Wolfe Road in the center of Cupertino's business and retail core, and close to the Civic Center. The existing office product’s primary competition is located at the southeast corner of Stevens Creek and North De Anza Boulevards where there is a sizable inventory of garden office space. The Study Area contains no retail space, but there is a small amount of retail space as well as a boutique hotel immediately adjacent to the west. Despite being mid-block and median-bound for access purposes, the small amount of retail has reasonable long-term viability given its small size and primary purpose of serving the Study Area. However, the retail has little synergy with other nearby projects, and has no orientation to or visibility from adjacent streets. It should be noted that Apple is the major office tenant. Apple’s employee commissary, located adjacent to the project site, features extremely reasonable prices, good food quality and variety, and inviting indoor and outdoor dining areas, capturing much Apple-generated foodservice demand. This "closed architecture" further limits retail potential on-site. Retail Market Evaluation Uses most appropriate for the site include office, residential, and retail that serves the daytime office population. For retail, convenience-oriented or lifestyle uses would fare best (e.g. restaurant, salon, health club, convenience or sundry store). Restaurants with a nighttime gathering element (e.g. a bar or more casual sit-down restaurant with a bar component), in particular, might do well. Apple’s commissary and other services to employees limit the viability of other retail and especially restaurant users establishing themselves at this site. Site Evaluation The limited retail offerings on the block have no visibility from Stevens Creek Boulevard or side streets. The project’s main entrance from Stevens Creek Boulevard is mid-block and median- 1146 28 bound. Secondary access is available from Torre Avenue and by way of other internal streets. Right-in right-out access is available on South De Anza Boulevard. Daytime parking demand appears to be accommodated on-site, though the designated retail parking is not in close proximity to the on-site retail. Place-making Considerations Fundamentally, City Center is not a retail site. The project would need to be redesigned to create a retail statement, and better access and wayfinding signage would need to be provided to attract customers from outside of the Study Area. Only limited retail can be supported by City Center's office and residential population alone. Attractive outdoor and public gathering areas have been developed at City Center as well as on adjacent projects. Clearly, thought has been given to public gathering areas, with some providing protection from the elements. Some wayfinding signage is provided, however, it is not oriented to retail uses. Materials and amenities such as public seating areas are provided, and are of good quality. Functionality Evaluation Trucks block internal streets and by extension vehicular circulation when making deliveries. This impacts all site users and in some cases makes for less than ideal (or even unsafe) conditions for pedestrians and bicyclists. Study Area #3 – Pacific Gas and Electric Company (PG&E) Study Area #4 – Mirapath While the PG&E and Mirapath sites are two separate Study Areas, for purposes of this Report, because they are adjacent and would function as one site for retail development purposes, they will be discussed as if they were one Study Area. These adjacent Study Areas are located on the city’s northern border with Sunnyvale and are surrounded by industrial, low- to medium- density residential, and an adjacent small neighborhood-serving strip retail center located at the southeast corner of Homestead Road and North Blaney Avenue. If the two sites were to be developed together, the overall site may be appropriate for mixed-use development with both commercial and residential uses. If this approach were undertaken, careful consideration should be given to planning the retail component with access and visibility and access in mind. In the case of PG&E, the Study Area includes an approximately 21.91-acre parcel of land used as a regional customer service center, training facility, and equipment staging and storage facility. There is a large amount of vacant land. By way of background, PG&E is comprised of two entities: A publically traded corporation, and a public trust. This land is held by the trust, complicating matters if and when PG&E might initiate a sale of the Study Area land. The Mirapath Study Area encompasses one 0.98-acre parcel owned and operated by Mirapath, a data entry and lab infrastructure provider. The parcel fronts North Blaney Avenue and backs up to the PG&E Study Area. Existing improvements consist of a single-story building in front with a two-story structure behind. 1147 29 Real Estate Evaluation The Study Area is located in a predominantly residential area that, with the exception of the site’s current use and small adjacent commercial uses is characterized by low to medium density residential development. Existing power centers such as Target in Cupertino and Sunnyvale and Costco in Santa Clara presently serve the Cupertino Trade Area. Despite barriers to development such as its “inside” location, poor freeway access (although there would be freeway visibility for well-positioned signs), and need for mitigations on the surrounding residential area, the site may be viable for development of a big box commodity retail use such as Costco or Wal-Mart if for no other reason than the supply constraints on adequately sized sites for these users in the Trade Area. Emphasis should be placed on this site having potential viability due to its size and supply constraints, and not because it possesses site attributes that otherwise would make it attractive for retail development. The appropriateness of placing large-scale retail abutting non- or less-compatible uses will likely be considered should such development be proposed on this site. Retail Market Evaluation The only viable use for the Study Area would be a destination big box user, such as a Costco (which has expressed interest) or Wal-Mart. Perhaps two smaller big box users such as Winco and Dick’s, both of which are presently expanding their presence in the Bay Area, sharing the site in lieu of the big box would make some sense. In either scenario, some smaller-scale users that frequently co-locate with these large anchors might then become viable co-tenants depending on site planning constraints. If not for the capacity constraint posed by the lack of large developable sites in the trade area, this site would not be considered for retail development. That it has been considered reinforces that market demand for new 1148 30 development in the Trade Area is likely greater than supply of large developable sites or as allowed by current zoning regulations. Rezoning the Mirapath study area from ML (light industrial) to CG (general commercial) almost certainly makes sense. This property is small, fronts a thoroughfare, and is adjacent to another commercial use (the small shopping center to the north). Allowing this study area the flexibility to evolve into a small office or convenience retail use almost certainly would have greater utility for the owner, be more compatible with surrounding uses, and yield a higher residual land value than would a light industrial use. Site Evaluation Site access and visibility are poor. The site could have some freeway visibility if well placed and large enough signs were to be permitted. Visibility from Homestead Road is poor and limited from North Blaney Avenue. The small corner strip center at the hard corner of Homestead and Blaney means that the site has a mid-block location on both arterials, with no signal on either. These significant impediments to site access could be rectified through the integration of the corner strip center into the Study Area and/or the addition of traffic signals on both arterials (likely required traffic mitigations). The Mirapath Study Area’s value is primarily to provide a secondary access point to the PG&E Study Area. Required significant traffic mitigations should be expected, possibly further complicating access. As entitlements and land use designations are considered, treating both Study Areas and the corner strip center as one integrated site is recommended. Despite barriers to entry, and given the site’s mid-block position with no direct freeway connection, depth, and poor visibility, a Costco or other large destination retailer with strong drawing characteristics would likely be the only sort of use that might succeed in breaking this site free for retail development. Study Area #5 – Cupertino Village Located at the southwest corner of Homestead and Wolfe Roads, the Cupertino Village Study Area lies at the northern end of Cupertino at the city’s border with Sunnyvale. Cupertino Village is comprised of three parcels totaling 12.51 acres and is home to an 113,200 square foot shopping center directly across from the proposed Apple Campus 2. Cupertino Village is a multi-cultural center with over 40 retail businesses including 99 Ranch Market, Starbucks, Joy Luck Place restaurant, and the Duke of Edinburgh Pub and Restaurant. Adjacent uses include hotels (directly south, reciprocal access with the Study Area), small office uses, and multi- and single-family residential. Apple plans to build their second campus (Apple Campus 2) directly across Wolfe Road. With this in mind, Cupertino Village serves an important role in the northeast part of the City, particularly in light of the Apple Campus 2’s coming development. Cupertino Village, no doubt, would be a desirable housing site, and housing would likely yield a higher residual land value than would retail. If repurposing the site for residential development were ever desired, the loss of this retail amenity may not be in the best interest of the community and should be carefully considered. 1149 31 Owner Kimco has worked on redevelopment plans for the Study Area since 2009, with a majority of its activity in the last year. Entitlements allow for a total of 25,000 square feet of new retail in two structures known as Retail A and B, and a new parking structure to increase parking capacity. 1150 32 Over the last 12 months, Kimco has refreshed the architecture of the buildings, acknowledging Apple Campus 2 across the street, while trying to work within the previous entitlements. Ownership recognizes that this center has been extremely successful as an Asian-oriented shopping center with both a commodity/daily-needs and a lifestyle component, and acknowledges strong retail performers such as 99 Ranch. The renovation will have to be sensitive to existing customer base while also attempting to capture some of the value represented by Apple Campus 2 as well as the younger demographic in the area. There is an opportunity to diversify the tenant base with new buildings (e.g. quick service restaurant or other daily good amenities). The renovation is now anticipated to update the look and feel of the center and try to attract a broad mix of tenants who compliment the many Asian-oriented tenants presently on site. Reinvestment is planned to update older facades, bringing them to current standards and using new materials, cleaning up building lines, and opening up gateways for a more modern appearance. The renovated site will seek to make common areas more conducive for “hanging out” with seating areas and other features. Real Estate Evaluation The Study Area is located at one of the major intersections between I-280 and El Camino Real, and has close freeway access. Other competing retail areas include Stevens Creek and Wolfe Road (Vallco Shopping Center if redeveloped), Ranch 99 located at South De Anza Boulevard and McClellan Road, and the El Camino Real retail corridor in Sunnyvale. The site is well positioned given project spacing between Stevens Creek and El Camino Real, and Vallco's present condition. The site’s location across Wolfe Road from the planned Apple Campus 2 is a singular strength as well as an identifying feature for the project. Retail Market Evaluation Cupertino Village and the Marketplace are perhaps the closest examples in the City to a so- called lifestyle center. The Asian community serving tenant mix has proven to be a strong one, with daily-needs convenience-oriented users, foodservice and specialty tenants, and hospitality. An expansion of the Ranch 99 market should be explored, along with additional daily needs uses such as a drug store, boutique foodservice, and service uses (eg. cleaners, salon, office supply or stationary, etc.) due to the proximity to the new Apple campus and adjacent hospitality uses. Site Evaluation The site has good visibility from all directions, though it is somewhat obscured in places due to landscaping. Access is good with right-in right-out access on both Homestead Road and Wolfe Roads, and access to and from all directions being possible at the signalized access point at the Wolfe Road and Pruneridge Avenue intersection, and signalized U-turns at the Homestead and Wolfe Roads intersection. There are significant barriers to building new shopping centers in Cupertino. The combination of daily needs, foodservice, and hospitality users is well suited for this corner, particularly in light of the newly proposed Apple campus. Site Plan Recommendations Cupertino Village is well located at a prime signalized intersection. Parking, visibility, and access are all good. Internal circulation can be a bit difficult due to tight drive aisles, and the 45-degree orientation of buildings to the street grid. Ranch 99 parking is routinely impacted 1151 33 during the afternoon peak shopping period, though parking on the south portion of the project is generally more available. A pedestrian bridge across Wolfe Road to the Apple Campus 2 would be an excellent amenity for both the Study Area and Apple. The owner points out, we believe correctly, that the main question is how to maximize density on the site while maintaining balance with the surrounding uses and the community. Place-making Considerations As discussed, the 45-degree orientation makes parking and circulation less efficient than it otherwise might be, and its design further complicates widening the sidewalks in front of retail spaces that currently are not wide enough to accommodate outdoor seating areas and comfortable strolling through the various retail offerings. There are some nice courtyard and outdoor seating areas with protected promenades in some areas but not in others. Generally, there is inadequate protection from the elements. Little to no wayfinding signage makes the already difficult circulation even more of a challenge, however, it should be noted that tenant signs are prominent. Landscaping also hinders visibility in places. Outdoor seating is generally provided by tenants for the use of their customers, but the lack of project seating and uniformity of outdoor amenities is a lost opportunity for keeping customers on site and cross- shopping. There is neither a particularly strong sense of place nor any historic façade, however, it should be noted that the "Town & Country" environment is a pleasant one, and the Ranch 99 front elevation heralds back to the era in which the center was originally built. Cupertino Village’s more contemporary design should add curb appeal and be more compatible with the Apple Campus 2, however, incorporation of design elements showcasing the project’s (and the region’s) town-and-country roots might be worthy of consideration. Functionality Evaluation The loading area behind Ranch 99 is unattractive and perhaps dangerous with delivery trucks parked haphazardly and making deliveries, preventing motorists from easily maneuvering in the same space. Some improvements are planned with the planned renovation of the shopping center. These changes may provide some relief. Study Area #6 – Vallco Shopping Mall Vallco is addressed at length in the next section of this Report. Study Area #7 – Stevens Creek Office Center This approximately 6.99 acre Study Area, located along Stevens Creek Boulevard (between Saich Way and North Stelling Road), is improved with 108,500 square feet of office and 5,000 square feet of retail space (a small retail strip tenanted by Peet’s Coffee and Panera Bread). The existing buildings are one to two stories with on-site amenities such as covered parking, common areas, and a gym for office workers. The Study Area is directly between a Whole Foods to the west and a small retail redevelopment project immediately east. Additionally, a Target is located across Saich Way. Single-family residential neighborhoods are located to the north and northwest of the Study Area, a YMCA is located immediately north of the site, and there is other garden office space in the immediate area. Stevens Creek Office Center is already a mixed-use project with adjacent office and retail uses. The site might be desirable for residential 1152 34 development, more dense office development, additional retail development, or a combination of any or all of these uses. With respect to a mixed-use redevelopment of the site, particular attention should be given to access, parking, and visibility for the retail component of the site. Real Estate Evaluation Stevens Creek Office Center Study Area, centrally located in the City, is an older garden office development that, while appearing a bit dated, the owners try to maintain in a first class manner: Siding was recently replaced, and roof and mechanical systems are reported to have considerable remaining useful life. The project has a successful small retail component with Peet’s Coffee and Panera Bread. An adjacent property, Saich Way Station (see “New Retail Project” on the aerial above), has been fully entitled for redevelopment as a retail center, and a leasing campaign is underway. That project will likely have two restaurants with the balance being non-food uses. This redevelopment project is notable as it provides access from the Study Area to Saich Way (a signalized intersection), and also due to the integration of the Study Area’s retail with retail on the hard corner. Because of this adjacent project, the Study Area may be a candidate for further repositioning as a retail project, particularly if cross access with Whole Foods could be established. It should be noted that this connection was explored and rejected during the development of the Whole Foods project in 2005 due to grading difficulties. This concept could be explored again in connection with a complete renovation of the Stevens Creek Office Center. Retail Market Evaluation In its present configuration, the site is best suited for daytime population-serving retail uses such as restaurant (quick-serve or full-service), and service uses. There is some competing quick 1153 35 serve restaurant space (Starbucks, Noah’s Bagels) at the southwest corner of Stevens Creek and North De Anza Boulevards, and a number of commodity box stores in the immediate area (TJ Maxx, Party City, Home Goods). Once the adjacent retail redevelopment project is built, the Study Area will enjoy ingress and egress on Saich Way, have all turning movements available at the signal at Stevens Creek and Saich Way, and no longer be “median bound.” This improved access and the Target co-tenancy will be key attributes for which commodity retailers who prefer positioning stores near Target, and daily-needs retailer such as a drug stores. Consequently, all of these uses would become potential retail uses for this Study Area. For these reasons, continuation of the retail portion of Stevens Creek Office Center as it is presently configured, or a partial or complete redevelopment of the Study Area as a retail project are both viable options. Site Evaluation The site has good visibility from both eastbound and westbound traffic on Stevens Creek Boulevard with right-in right-out access from Stevens Creek Boulevard and from all turns on Alves Drive at the north end of the project (providing access back to Saich Way and the signalized intersection at Stevens Creek Boulevard). The Study Area’s overall parking ratio is 3.3 spaces per 1,000 square feet of leasable space, and the retail in particular is under parked and of poor design and circulation (e.g. narrow and dead-end drive aisle), reliance on compact stalls, and lack of reciprocal access to adjacent retail to the east. As discussed above, the proposed retail redevelopment project immediately adjacent to the Study Area will have a reciprocal access and parking agreement with the Study Area, significantly improving access and circulation to the site. This new site plan will alleviate some 1154 36 of the issues just noted. In addition to other reasons noted here, these improvements make the Study Area a potential candidate for redevelopment as a retail project. Taking advantage of the improved access, circulation, and parking will be key to maximizing the Study Area’s potential. If the site remains primarily an office project, there is probably little that could be done except restriping stalls to maximize stall size (given the limited area available for parking) and posting signs stating parking is limited to 30 or 60 minutes (limiting, for example, students using Panera as a long-term homework hangout) as well as improving way-finding signage. If the balance of the site is to be redeveloped as retail, then creating entry gateways from both Stevens Creek and Saich Way, and an overall site plan that maximizes visibility and parking, while simultaneously simplifying circulation would be of utmost importance. In either scenario, creating delivery zones to minimize congestion caused by double-parked trucks is important. Place-making Considerations The Study Area is a well-maintained suburban garden-style office project. Any opportunity to create pedestrian and/or auto paths of travel between the Study Area and the new retail project to the east and the Whole Foods to the west should be encouraged. The retail portion of the Study Area benefits from attractive outdoor areas, however, the outdoor area’s orientation does a better job of creating “curb appeal” to Stevens Creek Boulevard than it does providing as appealing an amenity as it might, making it less appealing to users than a more protected area might be. The introduction of additional protection from the elements as well as some protection from street noise could make the outdoor area more pleasant in the summer months and more usable during cooler, rainy seasons. Buildings and retail parking areas are well identified, but wayfinding signage for the overall Study Area as well as signage directing traffic through the project to the Alves Drive exit is missing. While it impacts the adjacent retail redevelopment project and not the Study Area, it is worth noting an opinion from an individual knowledgeable of that project’s entitlement process that policy makers appear to believe that retailers will locate where they want them to, and cited under-parked retail on the hard corner of Stevens Creek and Saich Way as an example (while this may be parked to code, it nonetheless may be underparked from a demand perspective). That these spaces will be leased should not be taken as evidence that the site plan is ideal or functional, but rather as evidence of a general undersupply of retail space in the City. These tenants will be looking for opportunities to relocate, and there will be ongoing implications for leasing the balance of the project. Conversely, the City required cross-access with the Study Area that it is reported to do elsewhere in the City. While this sort of cross-access will not necessarily make Stevens Creek a walkable shopping environment, it does foster a better overall retail environment, albeit occasionally to the betterment or detriment of a given landowner. Functionality Evaluation Both the retail and the office portions of the project are congested and under parked. The lack of service and loading areas leads to delivery trucks double parking, adding to congestion. Continuity of Place Evaluation The Study Area’s owner has evaluated redeveloping the property, evaluating a variety of uses from mid-rise office to residential to a variety of retail concepts. Like with many such 1155 37 evaluations, the allowed density has a significant impact on whether a particular redevelopment scenario might be justified by the required investment, and to take development, leasing, and construction risk as opposed to maintaining the status quo given the project’s occupancy and rental rates. To date, the status quo has prevailed. 1156 38 VALLCO SHOPPING MALL This Study Area, located on either side of Wolfe Road between Stevens Creek and I-280 and outlined below in a black dashed line, is comprised of 16 parcels. Ownership is split among seven owners and includes the Vallco Shopping Mall, and adjacent commercial and mixed-use properties. The Study Area is adjacent to the recently entitled Main Street project, the under construction Rose Bowl project, and to office space owned and used by Apple. It is immediately south of the proposed Apple Campus 2 and the Cupertino Village study area, both of which are located just north of I-280. This Study Area has historically been the commercial heart of Cupertino, however, Vallco itself has suffered for many years. The Vallco Shopping Mall consists of 14 parcels and contains the 1.3 million square foot mall anchored by Macy’s, Sears, and JC Penney. Various pads comprising the mall are either owned or operated on a long-term basis. There are various opportunities for this Study Area to be explored including: 1157 39 • Identify a viable, community-based strategy for revitalizing the current Vallco Mall and broader Study Area so that it remains a regional shopping destination, • Explore opportunities to create a walkable, vibrant, mixed-use “downtown” within the Vallco Shopping District that can serve Cupertino residents, workers and visitors, • Explore the possibility of incorporating public or recreational uses, • Ensure future development is more cohesive by creating better connections, architectural relationships, common spaces and parking between individual properties/ownerships, and • Consider creating a specific plan with specific detail and directions for future infrastructure improvements. Background and History The mall was originally constructed between 1974 and 1979. In 1988, the lower level was converted to retail from a former parking lot at a $20 million cost, increasing the total store count from 140 to 190. [6] The construction type is structural steel and concrete block frame, with masonry and concrete exterior. Despite these efforts, increased competition from other regional malls such as Stanford Shopping Center, and in particular Valley Fair which opened 1986 began to take market share from Vallco. Thereafter, while its competitors renovated, expanded, and re-tenanted to meet market demands, Vallco languished with incomplete development, defaults from prior ownerships, prolonged and unrealized redevelopment plans, management changes, and other set-backs. After beginning in the 1990s, the emptying of the mall continued into the mid 2000’s. One widely and commonly-cited reason for Vallco’s decline was a mismatch between Vallco’s mid- range stores and Cupertino and the surrounding area’s growing affluence and changing ethnic makeup, however, this only tells part of the story. The Balance of the story lies in the competitive nature of regional mall operation, leasing, and management: Vallco was unable to compete with the much larger and more sophisticated operators of Stanford and Valley Fair. [6, 7] Real Estate Attributes The Vallco Shopping Mall is centrally located in both the City of Cupertino and the Trade Area at the NWC of Stevens Creek and Wolfe Road. This is the second busiest intersection south of I-280 in Cupertino after Stevens Creek and De Anza. The Vallco site is bordered Stevens Creek, Wolfe Road, Vallco Parkway, and I-280. [8] • Stevens Creek Boulevard (31,845 ADT, 2007) is an east-west six-lane divided arterial that connects western Cupertino to downtown San Jose (via West San Carlos Street). 1158 40 Stevens Creek Boulevard provides access to SR 85, I-280 and Lawrence Expressway via interchanges. • Wolfe Road (27,390 ADT, 2009) is a four-to-six-lane north-south roadway that bisects Vallco Shopping Mall, provides access to I-280 via a partial cloverleaf interchange. North of Stevens Creek Boulevard the roadway is designated as an arterial in the City of Cupertino General Plan; south of Stevens Creek Boulevard, called Miller Avenue, it is designated as a major collector. It extends north to the City of Sunnyvale and south to the City of Saratoga. • Vallco Parkway (2,880 ADT, 2009), a less than 1/2 mile six-lane, east-west roadway, connects Wolfe Road and Tantau Avenue. Several entitled development projects border Vallco Parkway including JC Penney, Rose Bowl, and Main Street. Vallco Parkway’s lane configurations will be modified in conjunction with these development projects to four travel lanes with some on-street parking, and two additional traffic lights will be added at Finch Avenue (Main Street) and at the new entrance to the Main Street garage between Finch and Tantau Avenues. • I-280 (159,000 ADT, 2012) borders the north boundary of Vallco Shopping Mall. I-280 provides easy access from Cupertino to San Jose to the east, and to Peninsula communities and San Francisco to the north. • Public transportation serves the Vallco site. VTA, VTA Express, and VTA Limited bus service are all offered with stops at the Mall. Fundamental Site Attributes The Vallco Shopping Mall has excellent visibility from all directions as well as visibility of the project’s approximately 80’ foot tall monument sign which can be seen from I-280. Access is available from both Stevens Creek (right in, right out only), and Wolfe Road (RIRO, slip lanes north of the pedestrian bridge, and a signalized access point south of the pedestrian bridge). Internal circulation allows access to all major parking lots and structures as well as access under Wolfe Road. Parking of 4,886 stalls is provided in a combination of surface lots and parking structures. The overall parking ratio for the project is 3.8:1,000 s.f. of GLA. Land Use Designations, Zoning and Land Use Policies Policy 2-30: Maintain and enhance as a regional commercial area (including hotel), office, and entertainment center with supporting residential development at up to 35 du/acre. Create a master plan to define the mix of land uses. Encourage daytime and nighttime activities. Development agreement expired in 2006. Height limits of 60’ if a retail component, and 45’ if no retail component. Focus on better integration with surrounding uses. Source: Cupertino General Plan, 2005 Land Use: South Vallco Park Special Center (in 2005 General Plan) Heart of the City Specific Plan South Vallco Master Plan 1159 41 Current Land Use Future Land Use Note (a): Mixed-Use development now under construction Source: South Vallco Master Plan Zoning: P (Regional Shopping), and P (CG, ML, O, Hotel, Regional Shopping, Res) Source: Heart of the City Specific Plan (a) 1160 42 Competitive Landscape The area along Stevens Creek from ¼ mile east of Wolfe to ¼ mile west of De Anza represents the focal area for retail in Cupertino. There are no projects in the immediate area that compete directly with Vallco. Valley Fair and Santana Row (approx. five miles east), Westgate Mall (approx. three miles southeast), Sunnyvale Town Center (approx. four miles north), and Stanford Shopping Center (approx. thirteen miles northwest) represent the next closest regionally- oriented retail projects. Valley Fair, San Jose/Santa Clara Westfield’s Valley Fair Shopping Center opened in 1986. Presently 1,477,393 square feet, the Mall is home to 272 retailers including Nordstrom, Macy’s, Apple and Cartier producing $494.9 million in annual sales from over 16 million annual customer visits. Valley Fair is often cited as the highest performing mall in California. A new food court called the Dining Terrace opened in November, 2013, and a Bloomingdales is under consideration as a new anchor. Per the Macy’s representative, the Valley Fair Macy’s is one of their highest grossing stores in the United States. Macy’s is discussing locating a new Bloomingdale’s unit at Valley Fair. Westfield is exploring a 200,000 square foot expansion to accommodate Bloomingdale’s and a movie theater. Westfield recently remodeled its food court and created what it now calls a “dining terrace.” 1161 43 This amenity creates a place for people to gather, mingle, and linger. Lighting, materials, and the inside-outside connection expand the open environment during warmer seasons. Banquettes, tables that can be moved together, and internet stations allow visitors with various needs (groups, families, couples) to patronize the dining terrace. Santana Row, San Jose Opened in 2003, Santana Row is a 647,000 square foot mixed-use project with retail, hospitality, office, and residential components. There are over 3,500 parking stalls supporting the 70 shops, 20 restaurants, the 212 room Hotel Valencia, 622 rental units, 219 condominium units, and 65,000 square feet of office space. Westgate Center, San Jose A former regional mall that fell out of favor in the late 1980’s to early 1990’s, Westgate Center has been “demalled” and presently operates as a 645,000 square foot power center with over 50 tenants including anchors Wal-Mart, Target, Nordstrom Rack, Burlington Coat Factory, Ross Dress for Less, and Old Navy. 1162 44 Sunnyvale Town Center, Sunnyvale Originally built in 1979, the 36-acre site has recently been redeveloped into an outdoor, Main Street-style project anchored by Target (located on a podium over parking area 4) and Macy’s. The project’s 2007 plans called for 275,000 s.f. of office, 933,000 s.f. of retail (including Macy’s, Target, and a 2,624 seat cinema), and 292 housing units. Plagued in recent years by a highly public foreclosure, the site has emerged from receivership. 1163 45 Stanford Shopping Center, Palo Alto Originally built in the mid-1950’s, Stanford Shopping Center has evolved into a regional mall with 1,364,000 square feet of retail space and restaurants with 140 stores including anchors Neiman Marcus, Bloomingdale’s, Macy’s, and Nordstrom. According to an October 24, 2013 San Francisco Business Times article, the owner made an application for a major remodel that will create four new shop buildings totaling about 140,000 square feet located where Bloomingdale's presently operates. Bloomingdale's will relocate to Fleming’s former location, and Fleming’s has already moved to a new building. The total GLA of the mall, which generates approximately $5.4 million in sales taxes annually, will stay roughly the same. [9] 1164 46 Vallco Site Area Vallco Shopping Mall contains a total of approximately 50.60± acres, of which 32.04± acres are owned by the anchor tenants, and 21.13± acres are owned by Vallco Shopping Mall, LLC. [10] The various mall ownerships listed here as well as adjacent owners are shown on the following map: Parcel Owned Site Area 316-20-089 (Macy's) 6.942 Acres 316-20-080 (Sears) 12.410 Acres 316-20-094, -095 (JCPenney) 12.684 Acres Subtotal - Anchor Parcels 32.036 Acres 316-20-099, -100 4.965 Acres 316-20-081 (Sears Lease) 4.379 Acres 316-20-096, -097, -098 9.219 Acres Subtotal - Mall Parcel 18.563 Acres Total Owned Site Area 21.126 Acres Total Center Site Area 50.599 Acres 1165 47 Vallco Leasing Makeup Vallco Shopping Mall’s tenant make up is summarized in the following chart [11] and the leasing plan that follows: Component GLA Area Macy's 176,962 SF Sears 280,185 SF J.C. Penney 202,360 SF AMC Theaters 80,500 SF Total Anchor GLA 740,007 SF (58%) In-Line 436,523 SF Food Court 11,073 SF Restaurants 29,960 SF Major Tenants 59,238 SF Subtotal-Mall Shop GLA 536,794 SF (42%) Total Center GLA 1,276,801 SF (100%) Total Owned GLA 617,294 SF (48%) 1166 48 Development, Ownership, and Repositioning History Vallco Fashion Park opened in September 1976. Among its unique features were several “parks” in the Mall's main walkway, each showcasing aspects of local history, the Ice Capades Chalet (one of two year-round skating rinks in Santa Clara County) which operated for almost ten years before encountering trouble in 1986, and the Tilt Family Entertainment Center which opened in 1990. TIAA held a loan on the property at the same time that Jacobs Group, who had an interest in Vallco (the JG Cupertino entity), was winding down its retail portfolio. Jacobs had cleared out the Mall’s lower level with the idea of creating additional parking, resulting in lower net operating income at just the time the Mall was beginning to have significant issues competing with newly opened Valley Fair. TIAA foreclosed and subsequently came to own both the fee and leasehold interests. Shortly after the foreclosure, Douglas Wilson was appointed as the receiver (they acted in this role from August 2002 until June, 2003). During this time, John Nguyen approached on behalf of an investment consortium led by Alan Wong, Emily Chen, and John Nguyen. The group offered significantly over book value, and a deal was ultimately struck for a sale at $72 million. At the same time as the Mall was in escrow, in order to fulfill its fiduciary obligation to maximize the value of the receivership estate, the receiver formed a backup redevelopment plan that included hiring Callison as architect of record. [12,13] 1167 49 Among various options explored, the receiver investigated converting Wolfe Road to be one lane in each direction with 60-degree parking, demalling the project and having tenants facing the streets, relocating JC Penney onsite west of Wolfe Road, and addressing the pedestrian bridge which was viewed as a major impediment to pedestrian flow and hence the success of the Mall. Additional issues that were investigated but never resolved were the community’s ties to the ice rink and complications from Sears owning land under the Mall. Alan Wong, Emily Chen, and John Nguyen ultimately acquired the subject property and adjacent land parcels (Rose Bowl, Northwest, and Northeast) for a reported price of $67,000,000. The sale closed in June 2003. After acquiring the center in May, 2003, the Wong, Chen, and Nguyen team undertook to convert and upgrade the regional mall into a specialty center with an international tenant mix including entertainment, additional restaurants, and a new food court. One of the changes made to Vallco as part of these new renovations was to completely close the first of the mall's two levels in 2005, leaving the focus on the second floor. A few new tenants were recruited over the next few years including a 16-screen AMC Theater that was added on a podium level above the existing retail space, new retail space, and two parking structures that added 1,652± parking spaces. Unfortunately, by 2006, Vallco had the lowest occupancy rate (24%) of any mall in the area. 1168 50 Alan Wong, Emily Chen, and John Nguyen sold the Rose Bowl, Northeast, and Northwest parcels to Evershine, the owner/developer of Marketplace Center immediately southwest of the subject Sears (across Stevens Creek Boulevard). The reported purchase price for the land was $50.0 million. Surface parking lost on the sale of these parcels was replaced by the construction of new parking garages at the subject center. These additional parking garages were intended to permit more intense development on other parcels, including the adjacent "Rose Bowl" site, a 50-unit detached home project on the “Northwest Development” parcel, and a hotel on the “Northeast Development” parcel (all planned, but only the Rose Bowl site was eventually developed). In addition to the Alan Wong, Emily Chen, and John Nguyen purchase, a new venture partner, Orbit, reportedly invested $33.0 million ($22.5 million in cash and $10.5 million in a note) for an 85 percent interest in the Cupertino Mall ownership entity. The proceeds were reportedly used to clean up mechanics liens, pay down the loan, establish an interest reserve, and recapitalize the project. In 2006, United Commercial Bank loaned Cupertino Square, LLC $195 million to further recapitalize the project and to provide development funds. In July 2007, Orbit Resources acquired the Mall, and Vallco Fashion Park's name was changed to Cupertino Square, and managing agents were switched from Landmark Property Management to Jones Lang LaSalle. Renovation of the mall that began in 2005 continued, and by 2009 two new parking structures, a 16-screen AMC movie theater, a food court, and Strike Bowling (at the former location of Tilt Family Entertainment Center) had been added. In September 2008, the two owners of the complex filed for bankruptcy to prevent the primary financier Gramercy Capital from foreclosing on their property. By September 2009, Vietnamese food processing company Son Son Co. purchased Cupertino Square for $64 million in an all- 1169 51 cash deal, and restored the name Vallco Shopping Mall. Vallco also hosts the every-Friday Pacific Coast Farmers' Market in the parking lot behind JC Penney. [14, 15] Ground Lease Discussion As noted, three parcels comprising portions of the subject property are on ground leases. The details of these leasehold interests are as follows: [16,17] • The first ground lease (APN 316-20-081) dated 8/26/88 with Sears as the ground lessor and the mall owner as the ground lessee, is for a 4.38±-acre parcel of land, expiring November 30, 2074. The annual rent of $290,628 is flat over the lease term. The land subject to this ground lease is improved with approximately 52,000 square feet of mall shops. • A second ground lease dated 8/22/06 was consummated with JC Penney as the ground lessor and the mall owner as the ground lessee to construct an additional 45,000± square feet of retail space adjacent to JC Penney. The ground lease commenced November, 2006 with a term of 30 years and three ten-year options to extend at an annual rent of $320,000 per year, with ten percent increases every ten years. At expiration, JC Penney may require the demolition of any improvements, and conversion back to parking. • Cushman Wakefield was also provided with an unexecuted (draft) lease for a second ground lease by the mall owner for a 0.36±-acre parcel owned by Sears. The commencement date was reported to be November 2006, with a 50-year term, and five five-year options at an annual rent of $189,656, increasing eight percent every five years during the term and options. Based on the draft, unsigned leases, California Pizza Kitchen and Islands restaurants each planed to lease stand-alone restaurant buildings that mall ownership planned to construct, but which were never built. It is assumed this lease was never consummated. Title Review Discussion As part of the process of developing alternative scenarios and recommendations, thousands of pages of recorded documents were reviewed. These documents give insight about development intent, certain tenant’s lease rights, and restrictions placed on the project. Following are the key findings: Master Ground Lease for Mall Development Originally the developer structured the Vallco Shopping Mall development on a ground lease with a related developer entity as the ground lessee commencing on 9/1/74 with a term of 47 years plus two options to extend for 20-years each. On 10/22/98, a Memorandum of Ground Lease with a term from 11/1/98-10/31/58 was recorded showing TIAA as the ground lessor, and JG Cupertino (Jacob’s Group) as the ground lessee with JG having a purchase option. These two interests merged on 6/12/03 when the new John Nguyen-led ownership group purchased 1170 52 the fee and leasehold interests in the Mall from TIAA. These combined interests were transferred to the present owner, Vallco Shopping Mall LLC, on 9/11/09. Construction Operating Restrictions Easements Agreement (COREA) The COREA, dated 2/19/75, initially was between Vallco Fashion Park Venture (the development entity), Federated (Bullocks, briefly Emporium, now Macy’s), and Sears. Macy’s is the successor- in-interest in a sub-ground lessee with a 27-year term commencing on or about 12/1/74 with one 20-year and four 10-year options to renew. The COREA provides among other things for the following: • A 60-year term extendable to up to 99-years if the majors continue to operate. • Easements across all tracts for vehicle and pedestrian access and circulation. • The parties can each redesign their own parcels, with each anchor having exclusive right to design its entry court to the Mall. • The establishment of minimum and maximum buildable areas and parking ratios for each parcel. • Use restrictions requiring operation as a first class regional mall, and establishing a list of restricted uses which appear typical of shopping center governing documents. • A developer requirement to continuously manage and operate the Mall, and for the anchor tenants to operate continuously for a minimum number of years (all since expired). • A provision that all parties are required to modify the COREA. First Amendment to COREA The First Amendment to COREA, dated 8/1/75, established minimum and maximum buildable areas, parking ratios, and a developer requirement to use best efforts to maintain at least 65% occupancy between Sears and Bullocks (now Macy’s). Second Amendment to COREA An amended and restated COREA was dated 12/1/75. A complete copy was not available for review. Third Amendment to COREA Dated 9/14/76, the third amendment established construction and financing schedules of performance, parking ratios, and parking locations. Fourth Amendment to COREA Dated in August, 1980, the fourth amendment established buildable area minimums and maximums and updated parking ratio as well as a provision for a bus stop in the common areas adjacent to Sears. Fifth Amendment to COREA Dated 2/15/84, the fifth amendment memorialized Federated’s interest being assumed by Carter Hawley Hale (Emporium). (CHH was later purchased by Federated, reverting that interest back to Federated.) Sears Documents • On 2/19/75, Sears granted the developer an easement co-terminus with the COREA to develop parking areas, and a connection between Sears and the Mall. • A ground lease by Sears to Westland dated 8/26/88 terminating the earlier of 11/30/74 or 1171 53 when COREA terminates with a right of first refusal by the ground lessee to purchase the fee. • Lease of the lower level by Sears to Westland. Development Agreement A Development Agreement dated 10/8/74 between the City and the original Mall developer provided for the following: • Construction of 1,028,436 square feet of net rentable area. • Rose Bowl site to be developed for office uses at a 0.37 FAR. • The granting by the City of air rights over Wolfe Road for the construction of a pedestrian bridge, and for the construction of two levels of underground parking. • Provision for the construction of a rapid transit station adjacent to I-280. General Plan Amendment A General Plan Amendment dated 7/1/91 and a Development Agreement dated 8/15/91 between the City and Westland were approved with a term of 15 years expiring August 14, 2006 (in 2005, the agreement was extended to August 15, 2009) and contained the following terms: [18] • The General Plan Amendment (2-GPA-89) increased the designated development capacity for the Shopping Center by 260,000 net rentable square feet, which, taken together with the available capacity under existing approvals, provided for 535,000 square feet of future development on the Property and the Rose Bowl site (for a total build-out of 1,645,700 square feet of net rentable space). At least 80,000 square feet of the total 260,000 square feet of additional net rentable square feet authorized under 2-GPA-89 were to be reserved for use by a “Single User.” This single user became AMC Theaters which leases 80,500 square feet • Cinema: A cinema complex was approved for the Shopping Center subject to the conditions attached to Application 9-U-90 which allowed for a 2,500 seat cinema to be built adjacent to the Sears store or a 3,500 seat cinema may be built on the Westside Site (these locations are noted on Exhibit B attached to the development agreement). A cinema would reduce the total build out authorized under the Master Use Permit by 100,000 square feet. A fourth amendment to the development agreement recorded 2/9/06 permitted the 2,500 seat AMC Theater. • Parking: Additional parking to accommodate future development was required to be provided at a ratio of 1 parking space for every 248 square feet of gross leasable floor area of retail space. Additional parking requirements are established in the COREA as noted above. • Ice Rink: The developer was required to operate and maintain the ice rink facility at no cost to the City. If the developer expanded the center by 100,000 square feet of new net rentable space during the term of the development, the continued operation of the ice rink would become a permanent condition. If 100,000 net new square feet are not added, the developer would only be responsible for operating the ice skating rink for the term of the development agreement. The ice rink is excluded from the maximum GLA calculation. • Park and Ride: The developer agreed to establish a shared use park and ride area for 75 spaces. • Child Care: The developer agreed to operate or cause to be operated a child care facility within the Shopping Center throughout the term of the development agreement. • The Rose Bowl parcel was rezoned to P (CG, ML, Office, Hotel, Regional Shopping); 1172 54 however, the rezoning maintained the retail, office, industrial use, and the hotel use option available under the prior planned development zoning for the Rose Bowl Parcel. On August 23, 2004 Resolution 6269 was passed calling for the approval of an architectural and site review for 138,760 square feet, 204 residential units and a parking structure on the Rose Bowl site. On the same date, the City Council recommended the approval of a use permit permitting the development to construct 204 residential units (for-rent condominiums) and a parking structure. The Architectural and Site Approval was completed by the Cupertino City Council on March 15, 2005. A fifth amendment to the development agreement recorded 2/9/06 permitted development of the Rose Bowl site with 138,760 s.f. of retail and 204 dwelling units. Tenant Leases Various leases are on record with the following terms noted: • TGIF: TGIF’s lease commenced 9/1/74 and expires 8/31/21 with two 20-year options to extend. A separate memorandum of lease shows TGIF’s lease dated 11/29/76 commencing 12/21/77 and running for a term of 20-years with one 5-year option to extend. It is unclear which is correct, however, Friday’s still operating would support a theory that it is the former. • AMC Theaters: AMC executed a lease on 5/5/05 for 15 years with three 5-year options and one 4½-year option. The lease includes the following provisions: o A protected area requiring AMC’s approval for changes of any parking areas west of Wolfe Road including the then newly built parking deck, and all pedestrian access to and from the parking areas, but allowing the landlord rights to certain future building areas (lease § 26). o A requirement for the landlord to continuously operate the property as a shopping center. o Restrictions on the sale of movie concession food or beverage within 50 feet of AMC’s premises, in common areas, or in parking areas, on so-called noxious uses typically restricted in shopping center governing documents (but allowing Lucky Strike bowling alley), and on a health club. • Lucky Strike: The bowling alley executed a lease on 12/11/06 for 38,000 square feet of space for a term of 15 years from 1/1/07 to 12/31/22 with three 5-year options to renew. • Ross Dress for Less: Ross executed a lease on 7/21/92 for 10 years plus three 5-year options. The lease requires the mall to remain retail in nature, and no so-called noxious uses in defined protected areas. Ross has since relocated out of the mall. • The Bay Club: The Bay Club’s lease dated 3/15/11 has a term of 15-years 4-months plus options to renew for three 5-year periods. The lease establishes part of the common areas as protected areas requiring Bay Club’s approval for modifications, and an exclusive for a health club on Sears’ lands. • Sprint: Sprint has two leases for cell towers, each commencing in 2002 with a 15-year initial term plus two 5-year options to renew. Stakeholder Interviews and Discussion – Anchor Tenants Macy’s Todd B Scheffler, Macy’s Director of Real Estate responsible for the area including Cupertino, was interviewed regarding Vallco. Like with all chain retailers, market share and goodwill are 1173 55 important considerations for Macy’s. Macy’s cites a legacy customer that shops at its Vallco unit as well as low operating costs, and a low book value which allows relatively flat sales (+/- 1-2% from year to year) that are “moderate not killer” to produce a positive EBITDA and contribution to the parent company. Macy’s sees itself as a partner in the community; giving back to the community is a stated policy initiative. The Company feels it is important to remain open where goodwill has been built over time and they are vested in the community. Mr. Scheffler noted the Chairman is a merchant for whom aligning the Macy’s brand and merchandising with market demand and serving its legacy customer are key. It was confirmed that the Vallco store does better than Macy’s at Sunnyvale Town Center, but much lower sales than Valley Fair. Macy’s self-characterized as a conservative company concerned with operating department stores rather than being in the real estate business. While no plans to do so were expressed, if choosing a store to close between Vallco and Sunnyvale, Sunnyvale would be the more obvious choice. With respect to Vallco specifically, notwithstanding the focus on operations as opposed to real estate, Macy’s is keenly aware that its long-term control has real value. From an operational perspective, there is always an eye to market share and goodwill, and the potential impact closing a long-established unit might have on its overall market position. Since the store makes money, the tendency is not to consider closure, however, if there were an opportunity for a meaningful capital event, and if there were an opportunity to transfer the Vallco business to another location, a closure would be evaluated by the company. Macy’s believes they get some AMC and some JC Penney cross-shopping, but that the project really is no longer a shopping center in the traditional sense. The common areas are a vacuum with no energy or amenities, and it is not a place to socialize or walk. With respect to redevelopment strategies, the answer was that everything is plan-specific. For example, Macy’s understands that the underutilized parking next to its store is a development opportunity. Citing a potential increase in customer traffic and that traffic generates sales, Macy’s indicated it would look at any opportunity to increase customer traffic and to optimize the site including a mixed-use redevelopment plan, a demalling strategy that would bring in larger box retailers, or an open air environment with inviting common area. Macy’s previously agreed to permit the undeveloped triangular parcel north of its store to be developed as residential and for a parking deck supporting the mall and the to be built AMC Theater (see Grammercy site plan) with the thought that the additional development would be good for the project and for Macy’s. A 6th Amendment to the COREA would have established fee interest transfers, but was never consummated. While the residential portion was never built, the added parking infrastructure does serve Macy’s customers’ needs. Grammercy documents indicated that a never executed 6th Amendment to the COREA called for Macy’s to receive $2.3 million as consideration for a new REA that extending through 2075. Macy’s reportedly indicated that a store remodel would be explored if a major interior mall model were to be undertaken. At the time, the store upgrade was estimated to be a $5 million investment. By way of comparison, the Macy’s store at Westfield’s Eastridge Mall (13 miles from Cupertino) was in similar condition to Vallco before being renovated in 2005 (an AMC 1174 56 theater was also added as part of that repositioning). The Eastridge Macy’s post-renovation sales reportedly increased 40%. [19] Citing their positive anticipation about Sunnyvale Town Center (which had Macy’s along with other retail, office, restaurants, and residential uses), Macy’s reiterated its interest in evaluating any redevelopment plan that would increase traffic, and that, at this point, there is no disposition initiative. Clearly disappointed with Sunnyvale Town Center and frustrated with delays caused by ongoing legal maneuvering, the Macy’s representative stated there is “nothing wrong with their Sunnyvale store except it needs a mall.” Similarly, Macy’s is not happy with Vallco, and believes the current owner, who is not experienced with regional malls, purchased the property for its redevelopment potential and appreciation value rather than to operate as a Mall. Sears Jim Terrell, Vice President of Real Estate, and Robyn Alexander, Associate General Counsel - Real Estate, both of Sears Holding Company, and Ivor E. Samson of Dentons discussed Vallco on behalf of Sears. Sears self-reports as the second largest holder of retail real estate in the United States after Wal-Mart. Sears does not see Vallco as a cohesive project because, among many things, work needs to be done on the mall portion of the project, the site is bisected by Wolfe Road, and deferred maintenance. These factors make Sears reticent to reinvest in its store at this time. In contrast to Sears reticence today, Grammercy documents indicate that Sears invested $4MM of its own capital in the store in 2005, when the Vallco Sears was the second highest grossing store in its district with sales of $35 million (as compared with average sales of $38.8 million over the prior 5 years). As part of the unconsummated 6th Amendment to the COREA, Sears was reported to have received $1 million which they were required to invest in their space. [20] We note that Sears has since given up considerable market share in the Peninsula sub-market with the closure of both its Mountain View and San Mateo stores. Sears first and foremost wants to understand how its property is key to any redevelopment of Vallco. Stating they would be cooperative, they cautioned they intend to maintain control over their real estate, they do not want any planning process to result in a redevelopment plan they do not like, they want to retain the flexibility to improve their parcel with the highest and best use whatever that might be, and they want to participate in any conversation that might be happening with a developer who might be in the wings (which they believe to be the case). There was little interest expressed in either relocation or a store closure. The Sears representative commented that Sears is not in the business of creating redevelopment proposals, and they would like to hear more about what the City would like to see at Vallco. Sears was interested in understanding whether Successor Agencies would be permitted to exercise power of eminent domain in the public interest since the dissolution of redevelopment agencies in the state. Sears feels the community embraces its store in Cupertino, and without citing specific sales or 1175 57 other parameters, confirmed that the store contributes well. Any redevelopment analysis would take into account added value with respect to both real estate and operations with a view to the long term and how the property will be positioned far (say, 20 years or more) in the future. Bay Club was cited as an example of a nice addition, but also one that does not fit well with the mall in its present iteration. Sears also pointed out that the impact of construction on operations would need to be taken into consideration; while there may be a sales lift after a remodel, sales are negatively impacted during the remodeling process that can easily take up to 24 months. Sears’ perception is that others are “envious” of Sears having the largest parcel within Vallco and more than ample parking. While possessing good real estate and store level economics, Macy’s is viewed by Sears as disadvantaged when compared with Sears. Sears is concerned that its parking stands alone, and that any redevelopment scenario should have each parcel stand alone with respect to parking. Sears would consider newly created shared parking (including structured parking) where that shared parking is advantageous to Sears and where Sears is not being asked to “subsidize” parking for the balance of the project. We do note that the operating documents state that all parking is to be in common among all parcels of the shopping center. Sears will certainly also evaluate key retail real estate fundamentals such as ingress/egress, traffic flow, visibility, and compatible uses. JC Penney Bradley Syverson, VP Real Estate and Area Research, and April Webster, Real Estate Manager were interviewed about JC Penney’s Vallco store. Once operating as both a store and as a stockroom for local catalog sales, Penney’s building contains 213,000 s.f. while only 130,000 s.f. is merchandised today for retail sales. Penney would like to see a dramatically improved retail project, and would like to have 120,000-130,000 s.f. of selling area (130,000-140,000 s.f. of gross floor area). While the surrounding mall environment is severely lacking, the store performs well. JC Penney has reinvested in the Vallco store over the past two years including the addition of a home department and other shops within the store. Book value would have increased with this reinvestment. Sales were quoted at $22 million in 2012 which is attributed to JC Penney’s strong franchise with local consumers, and favorable site attributes such as good visibility and easy access and parking. With respect to redevelopment of the property, Penney would entertain any reasonable proposal including a mixed-use alternative. They would be concerned about the size of a retail component as part of such a project, like many retailers wanting to be part of a critical mass large enough to be a destination attraction for customers. According to Grammercy, in 2005, the Vallco JC Penney (Penney’s only unit in Silicon Valley) generated $2 million in net income, placing it in the top 18% of all JCP stores nationally and 2nd among the 14 stores within the Bay Area. Sales in 2005 were $32 million with average sales of $30.9 million over the prior 5 years, and the store reportedly maintained profitability despite on-going construction. JC Penney invested $3.5 million in 2005 to remodel the store’s interior, 1176 58 and would have received $400,000 towards that effort per the unconsummated 6th Amendment to the COREA. [21] It is well known that JC Penney is repositioning itself in the retail marketplace. The Company’s stated goal is to monetize its fee ownership of 12+ acres, however, they would like to continue operating in the market and at Vallco. Both a sale-leaseback or an on-site relocation would meet the Company’s dual objectives. With respect to the sort of transaction that Penney’s would consider, if the value being paid for the real estate were to be significantly more than income from operations, store closure would be considered, however, like Macy’s and Sears, the Company’s goal is to be an operator of retail stores and not a real estate investment company. Accordingly, any buy vs. sell or relocation vs. closure analysis would weigh heavily towards store results, take into account Penney’s low occupancy cost, and be mindful of Bay Area real estate costs creating a high barrier to entry at another location. The Bay Club Per Peter Berkowitz, the Bay Club opened in 2012 as Sears’ sub-tenant. Membership is reported to be growing nicely, and due to a combination of the Club’s upscale market positioning and Cupertino having a significant daytime in-migration of workers, the Club draws from a wider radius than might otherwise be assumed. An interesting observation is that shoppers will go from Cupertino to Valley Fair and Santana Row, but Vallco does not have a compelling offering for anyone to think of it as a destination. The Club’s parent company maintains a keen interest in how the intersection of Stevens Creek and Wolfe is developed. Stakeholder Interviews and Discussion – Rose Bowl KCR, a family held development company and the Rose Bowl developer, has operated retail projects in Cupertino since the mid to late 1990’s. They own and oversaw the repositioning of The Marketplace, and continue to do ground-up as well as value-add project which they manage themselves. The Marketplace is successful: Marukai’s only Northern California store is a top performer, Elephant Bar does well despite selling more food than alcohol, and most other tenants are reported to be doing well with solid customer counts. The Rose Bowl, a mixed-use project KCR purchased with entitlements in place and located at the SEC of Wolfe Road and Vallco Parkway, will have 204 residential rental units and 60,000 s.f. of retail space when complete. Retail space will face Vallco Parkway and Wolfe Road with three access points (one off Wolfe, two off Vallco). Structured retail parking is to have a 10:1,000 s.f. ratio which, while not the stated intent, would allow for the project to be predominantly restaurant. 1177 59 The mix is purported to have mainstream uses such as full service and QSR restaurants, dessert shops, and neighborhood-serving retail such as a dry cleaner and other daily needs, convenience oriented tenants. Tenants are beginning in inquire in connection with the anticipated Apple Campus 2. With respect to the Mall, KCR also owns the triangular parking lot north of JC Penney, with a business-oriented hospitality use in mind for the property. Changes in general plan designation as well as limited freeway visibility are viewed as the primary development risks. KCR believes there is a real opportunity to reposition as a mixed-use project. KCR has been approached about taking on the Mall and has declined. S takeholder Interviews and Discussion- Other Note: Many of those interviewed asked that their comments be held in confidence. Identifying remarks and references have thusly been eliminated. • A common sentiment was that Vallco presents a huge opportunity if all parties can be brought to the table. A stakeholder hoped that after years of neglect, the City is finally recognizing the need for involvement in change at Vallco, and there is popular support for different uses. • While it is quite dated, a shopping center developer felt there is an opportunity to position Vallco as a community shopping center driven by daily needs and convenience, and that if Vallco were to go through a significant reinvestment, it would only be good. • An interviewee familiar with Sears commented that Sears’ position that its real estate is valuable, and not wanting to “subsidize anyone else” is consistent with its approach elsewhere. A number of people familiar with Vallco pointed out that if those controlling 1178 60 restrictions in the COREA and leases were pushed towards a common position, one of the biggest obstacles to redeveloping Vallco would be removed. • Another interviewee noted that in order for Santana Row to work, residential was required to justify development and open space costs, and to create a place people want to be. Yet another view was that the City is culpable for Vallco’s present situation, particularly when Vallco is contrasted with how progressive neighboring cities have been (for example, Santa Clara with Related Company of California’s Santa Clara project near the new 49ers Stadium ). • According to a broker with considerable experience in the Cupertino market, Vallco is challenged by being roughly midway between Valley Fair and Stanford Shopping Center. Consistent with this opinion that Vallco will never be able to compete with either of these highly successful projects given the highly competitive nature of the regional mall leasing business: Larger landlords with multiple shopping centers are able to condition offering tenants spaces in highly desirable projects (ie. Valley Fair) upon tenants also leasing spaces in less desirable projects. Furthermore, they are able to withhold spaces from tenants who might open in a competing project, and this is precisely the issue that Vallco might face if it were to try to reinvest itself as a traditional regional mall. Westfield likely views Vallco as a nuisance, but one that needs to be addressed nonetheless. On the plus side, the entertainment value of the ice rink and AMC was acknowledged. Redevelopment issues include restrictions (governmental, and controlling documents such as the COREA), and the anchors’ naturally slow-moving internal decision making processes. The site is thought to have significant potential for other than retail uses: High-density housing and office space for companies associated with Apple in particular. The question was raised about whether retail might, in fact, yield the lowest residual land value of the available options. • An interviewee with familiarity about both Vallco and other regional malls in the Trade Area was aware of a group that did not move forward to purchase Vallco when Grammercy was marketing the project because it did not have enough leverage to attract tenants, and further had doubts that a third party regional mall operator (ie. a company working for a fee but who would never own Vallco) such as General Growth would leverage its relationships or trade a willingness to lease a desired tenant space in other in-demand projects as a trade for locating a store in Vallco. • Vallco operates in a trade area that is relatively mature. It was pointed out that strong projects in all major categories already serve the Trade Area that includes Cupertino: Valley Fair is an outstanding regional mall, Westgate Shopping Center is a strong commodity-oriented power center, and Santana Row has grown into an established and high-performing specialty center. Another interview reiterated that Westfield, owner of both Valley Fair and Oakridge Shopping Center, has a vested interest in making sure Vallco remains a third-rate mall. In so doing, it holds significant market share in the Trade Area as the dominant landlord for mall tenants wanting to serve the Trade Area. • A decision needs to be made about whether the project should be turned into a power center with box tenants that can absorb a lot of square footage, a specialty project, a mixed-use project, or something completely different. An executive with a national 1179 61 retail development firm commented that the biggest challenge with a project like Vallco would be to balance redevelopment economics with defining the project’s place in the market: The investment needed to buy out tenant interests, tear down the project, and rebuild it into something new would likely never work given rents that might be achieved. A corresponding recognition that a complete repositioning may necessitate “going backward” before “going forward” was also expressed. Overcoming retailers’ perceptions of Vallco will be another challenge. A leasing team that can leverage tenant relationships to get the opportunity to tell the “right story” – the pitch and the hook – about rebranding the project and why tenants need to locate at Vallco rather than going elsewhere would be necessary just to start the process. The tenant attraction process will likely be a years-long endeavor, and likely take 5-7 years to “get it right.” A traditional transaction-oriented leasing team (eg. a broker or institutional 3rd party leasing team) would find the assignment extremely frustrating. Accordingly, an adaptive reuse of the existing project would only be viable with a forward-thinking owner possessing a combination of a clearly articulated, long-term vision and the determination and deep pockets to match. • Santana Row is often invoked to describe a vision of a desired project. Santana Row’s success is attributed to the mix of retailers, service uses, and restaurants. The 640,000 square foot project can be thought of as follows: One third of the project is Crate & Barrel, The Container Store, Best Buy, and a theater. The next largest space is Club One at 30,000 square feet, H&M at 26,000 square feet, 8,000 square feet, and then quickly 2,500 square foot spaces. With restaurants mixed through the project, the opportunity was in creating the right groupings of tenants in districts-within-the-project. For example, Olin functions as a unit with a gym, office, emphasis on fast casual rather than sit down dining where families might go, moms and strollers and mommy & me classes, and park events. Olson is sleepier with two restaurants and service tenants such as a bank, dental office, and hair salon. Santana Row acts as the project’s “Main Street” with a mix of fashion, street retail and restaurants. A fashion tenant would not be appropriate for Olin or Olsen Streets whereas Dry Bay would not be for Santana Row. A sense of place was created through common area design, but also through architecture and, in particular, tenants having unique storefronts. The project’s biggest weakness is the lack of a traditional anchor tenant. • A project’s DNA and its tenants’ DNA need to match: Some tenants will have a so-called “comfort zone” in a regional mall and not in a Main Street environment. In contrast to Santana Row’s more experimental approach, Valley Fair tends to seek retailers with the biggest consumer franchises and the most ubiquitous names. While Santana Row may never win the back to school shopper, it will win on where you want go on Friday night. • Every retail project either works or does not work in its unique context and with its unique set of circumstances. Understanding that a “Santana Row” will not work everywhere is important. An important analog was drawn between Vallco and Santana Row: Neither project is easy to lease, and projects need a clear marketing statement/message to be successful, and a messenger capable both of communicating that message and going toe-to-toe with competing project’s leasing strategies. 1180 62 • From a leasing strategy perspective, keeping a project cutting edge is important. The “right” tenant mix needs to take priority over the notion that longevity guarantees future longevity: Just because a tenant has been in a project for a long time doesn’t mean it is appropriate to keep that tenant. Taking a step back and making a merchandising- appropriate decisions about tenant mix is essential. Refreshing storefronts and constantly improving the tenant mix also conveys the message that something new continues to happen. • Finally, the concept that every great retail center or street has its “anti-center” or “anti- street” was introduced. For example, Valley Fair has Santana Row. Beverly Center has The Grove. Santa Monica Place has the Third Street Promenade. Fifth Avenue has SoHo. There will likely never be an opportunity to “beat” Valley Fair, but there may be an opportunity to become the anti-Valley Fair Strategies for Repositioning Vallco Shopping Mall Vallco is being affected by the consolidation of retailers, increasing dominance of super- regional malls, the introduction of new retail shopping channels, and a variety of other forces. While Vallco enjoys a good location in the Trade Area, it lacks identity compared to alternative shopping venues. The BAE Retail Sales and Leakage Analysis suggests that a strong regional retail environment and balanced sales in the Trade Area (Cupertino’s annual retail sales are $10,483 as compared to $13,404 for Santa Clara County) constrain opportunities for additional capture of Trade Area resident spending through new retail development in Cupertino itself. We believe this same strong regional retail environment might, in fact, give Cupertino the opportunity to consolidate additional retail in the City given its compelling location and Vallco’s fundamentally excellent location; Vallco presents a unique opportunity to create a new retail nexus, although not necessarily in its present format. As discussed earlier, mid-range department stores have evolved into commodity retailers. Vallco’s anchors are effectively commodity retailers, however, the nature of a regional mall is more specialty in nature. Vallco has already evolved in the direction of a hybrid projects as is evidenced by its legacy anchors, which generate reasonable sales, and the beginning of a specialty offering in the form of The Bay Club and AMC Theaters. The following literature review and discussion of analogous projects will help explain that Cupertino and Vallco are not unique, and that the forces impacting Vallco are happening to many malls nationwide. Literature Review A literature review written by Maryia Hodge while a graduate planning student at San Jose State University summarizes issues some key concepts relevant to redeveloping Vallco as part of a downtown area. [22] Original sources are cited where possible. • Excess supply of retail space has shifted retail dollars to new centers without creating additional demand, leading to the decline of older centers. As long ago as 2002, it was 1181 63 noted that of the more than 2000 enclosed malls in the U.S., approximately 15 to 20 percent are headed for closure. [23, 24] • While shopping center owners may opt for cosmetic improvements, retail researcher Mark Eppli states that giving a decaying mall a facelift or introducing a new department store is unlikely to stem the tide of decline. What is needed is a more serious reconsideration of the relationship between the site and its surrounding community. [25, 26] • Barnes observed that regional shopping centers with uncertain and shifting identities lacked the ability to appeal to increasingly value-conscious consumers who had alternative channels such as factory outlet stores, catalogs, internet sales, and big-box stores. In addition, a “do-it-yourself” mentality drove customers from traditional retailers to warehouse stores. Meanwhile Robbins argues that by creatively rethinking public space and urbanism, decaying malls can be transformed into “genuine places in the older areas of our spreading suburban environment.” [27, 28] These observations support the theory that today’s retail landscape is a dichotomy of price and convenience-oriented commodity retailers, and specialty retailers congregated in appealing environments. Not coincidentally, shoppers are choosing alternatives to enclosed regional malls in part because those malls lack an identifiable sense of place. • Retail alternatives, or specialty projects where consumers enjoy spending their discretionary time and income, have become a major focus. Formats that add entertainment and cultural uses, or unconventional uses such as mixed-use centers, educational facilities, medical clinics, or a variety of other uses are increasingly common and sought after. Fitzgerald and Leigh agree that downtown shopping may be poised for a recovery, noting that “shoppers who used to buy in malls are now more willing to shop on ‘Main Streets.’” [29] • Two important notes about successful downtowns are as follows: o They must have active streets with pedestrian-oriented retail, a concentration of residents to promote activity, effective design that blends new and established development, o The successful downtowns that were studied all had either a university, a historic district, or were a state or provincial capital, suggesting that other conditions that increase density and contribute to a sense of place must be present. Caution is cast at so-called “new urbanism,” suggesting that “the loss of vitality in the suburbs in a primarily cosmetic way, opting for the appearance of cities but avoiding those essential urban traits...” does not work. [30, 31] Retrofitting Suburbs: Instant Cities, Instant Architecture, and Incremental Metropolitanism Harvard Design Magazine, Ellen Duhnam-Jones and June Williamson [32] The authors hypothesize that cities evolving over time (“incremental urbanism”) is not preferable to "instant urbanism" where large-scale development (as much as any real estate 1182 64 development can be instant) rises in place of a no longer viable project. They also point out that instant urbanism often is more sustainable. Growth trends that have resulted in once far flung suburbs now being more centrally located, California's transit and housing policies, rising land values, and few significantly large undeveloped sites are all trends supporting instant urbanism. Shopping centers that are no longer competitively or financially viable are excellent candidates for instant urbanism because they are typically well located, they offer the opportunity to crate a project of some scale, and they offer opportunities to support infill as opposed to exurban growth strategies. Two excellent examples cited in the report are Belmar in Colorado and Santana Row in San Jose. As large-scale redevelopments are undertaken, a number of issues should be taken into consideration: For example larger parcels are needed in order to justify the inclusion of open/public spaces in projects (the economics behind this assertion are discussed in the Vallco alternatives). Larger projects also help justify the costs of structured parking, and can be financially more predictable leading to financial structures with better terms. The inclusion of an office component creates jobs-housing balance as well as a "networked urbanity" that would be more appealing to the sort of younger knowledge workers who commute to but do not live in Cupertino. The authors note that incremental urbanism where the urban landscape has evolved over time tends to have quirks that can contribute to place making and a "cool factor," and that experimenting with a diversity of architecture should be considered as a part of any instant urban project. Converting Obsolete Malls CoStar, October 3-17, 2012 [33] In late 2012, Co-Star published a series of three articles on demalling America. As has already been noted, the articles point out that as anchor tenants merge and contract, dominant regional malls are faring better than secondary malls and do a better job attracting tenants. This trend is particularly important in light of many retailers trending towards smaller stores, exacerbating vacancy rates in weaker projects, and providing opportunities to augment tenant mix in stronger ones. The dominant malls' success is often at the expense of outmoded centers such as Vallco. The article asserts that 10% of the approximately 1,000 regional malls in the US will fail by 2022 and repeats the quip: “Shopping centers aren’t overbuilt, they’re merely under- demolished.” Malls are typically well located, and are designed for a shorter lifespan than other types of real estate such as housing and office (retail is routinely remodeled as customers are attracted to “new and shiny”). Malls need to provide a mix of shopping, dining and entertainment experiences, and whether with this in mind or not, many malls are being redesigned as town squares. Projects and stores that are not refreshed in a regular basis tend to fare far worse. Distressed malls often reflect financing issues. We agree with the author’s assertion that while painful on a case-by-case basis, that the culling of weaker properties from the market is a healthy process. A fundamental decision needs to be made about whether to reposition a mall or to demolish and start over. Regardless, a major repositioning represents key opportunities for visionary 1183 65 planning, political leadership, and the owner. There are positive externalities such as a well- executed project helping lure desired employers and their highly desirable workers that should be considered as well. Execution is difficult: In order to obtain financing, tenants need to be lined up in advance, and the authors point out that successful mall repositionings involve a combination of deleveraging, demalling, and deep pockets. These observations have been repeated by some stakeholders whose interviews are summarized in this report. Analogous Redevelopment Projects In a larger context, Vallco is certainly not the only regional mall to suffer a significant decline in the 1990’s. There are several analogs of regional malls in the United States, and one in particular in the South Bay that declined and subsequently were successfully redeveloped. Most of these projects have been repositioned as commodity projects, as hybrid projects with both commodity and specialty characteristics, or as mixed-use projects. The distinctions between commodity and specialty, and active versus non-active space (outlined above) provide a paradigm for discussing these analogous projects, and how Vallco Shopping Mall might be repositioned or redeveloped. Following are examples of former regional malls that became defunct around the same time as Vallco’s decline. Each was subsequently successfully redeveloped. Belmar (formerly Villa Italia), Lakewood, Colorado [34, 35] Belmar opened as Villa Italia in 1966 and flourished into the early 1980’s when a gradual decline precipitated by a slow economy, poor maintenance and competition began. When the center closed in 2001, three of its four anchors had left. Wanting to build an “urban mall,” the developer decided to divide the 104-acre property into a 22 city block, 3.5 million square foot mixed-use, pedestrian-friendly downtown district including a 900,000 square foot open-air mall, 269,000 square feet of offices, green areas, and 1,300 for-sale single-family residences, townhouses, and condominiums and apartments. 1184 66 The site had a good location with good visibility and high-density neighborhoods nearby, and the Villa Italia Mall had had a history of producing strong sales. The developer commented: "Initially, the property was developed on a grant lease, which had an underlying owner plus 140 subtenants. We had to figure out how to consolidate all those subinterests -- each with veto power -- into one. It was a huge undertaking that took several years and overlapped the actual development process. It was certainly different from buying 100 acres of cornfield." Another challenge was the issue of incremental development: "It would be wonderful if we could have just dropped in, demolished everything, and started from scratch -- had it all done at once. It doesn't work that way; it comes in increments. It's more evolutionary. You have to manage this constantly evolving site, as well as residents' expectations. It's going to be a few years before it comes into its own." Even though it is still a work in progress, Belmar already has become a bustling, vibrant downtown district for Lakewood, which had no such district before the renovation effort began. It represents the cumulative will of the city of Lakewood and its residents, who clamored for a downtown and an identity for the city. Village San Antonio Center, Mountain View Located at the northeast corner of El Camino Real and San Antonio Road, developer Merlone Geier, describes Village San Antonio Center as follows: [36] The site encompasses approximately 229,000 square feet of retail buildings on 16 acres of improved land. The property was developed over time with the initial construction 1185 67 taking place over fifty years ago. Formerly anchored by Sears, the current site/building configuration is representative of what was designed in the 1950’s with an expansive parking lot ranging from the adjacent streets to the building storefronts. Over time both the buildings and parking lot have begun to show their age. [The following aerial shows the pre-development plan.] The newly approved Village San Antonio Center is an infill based residential and retail redevelopment consisting of approximately 311,000 square feet of retail and restaurant space, 330 residential units, and associated sub-grade, on-grade and roof-top parking. It is anticipated that the project will contain a grocery store (+/- 65,000 square feet), a pharmacy (+/- 17,000 square feet), 330 residential units, three to four restaurants (+/- 4,000–9,000 square feet), one or more large format retailers (+/-175,000 square feet), and numerous small shop/office/retail spaces located throughout the project. The size and density of the residential building is consistent with the scale of the adjacent office building located behind the project. The approved redevelopment of San Antonio Center aims to be sustainable, innovative, and of long-term benefit to the City of Mountain View. Additionally, the redevelopment will likely kick-start a renaissance of the overall 56 acre San Antonio regional retail center. The project’s central location provides convenient citywide access from public transportation, as well as nearby higher density residential neighborhoods, mitigating dependence on arrival by car. 1186 68 In addition, the vertical orientation and density of the project conserves land, resources and reduces impact on the city’s infrastructure. If developed as a conventional single- story retail center, a project of this magnitude would occupy over 40 acres of land, in contrast to San Antonio Center’s 16 acre site area. The fundamental design goals of the project are: i) to create a vibrant retail and residential project that is responsive to the adjacent context; ii) create a unique sense of place through the development of iconic architectural elements and amenities; iii) provide public open plazas; and iv) provide an active pedestrian oriented shopping and dining experience. Englewood City Center (formerly Cinderella City), Englewood, Colorado [37] Cinderella City Mall originally opened in the 1960’s. By the mid 1980’s, new and newly renovated malls began to compete for market share and also brought new designs and new tenants, causing Cinderella City to appear dated. By the mid 1990’s, anchors began to close, Foley's being the first and Montgomery Ward being the last at the end of 1997. The remaining approximately 100 tenants followed suit, often relocating to competing projects. 1187 69 During the following years, the city of Englewood would create, revise, and reject in excess of 30 redevelopment plans, ranging from complete demolition and turning the land into a park, to keeping the structure and converting it to an art museum. In 1998, a final plan was adopted to rehabilitate the area with transit-oriented development. Catalyzed by a future Regional Transportation District (RTD) light rail station, Englewood planned on remaking the former mall site as a "downtown", complete with luxury apartments, mixed-use retail and residential buildings, and "big box" stores such as Wal-Mart, Office Depot, and The Sports Authority. Sherman Oaks Galleria, Sherman Oaks, California [38] The three-level mall opened at intersection of Ventura and Sepulveda Boulevards in Los Angeles’ San Fernando Valley in 1980 with department store anchors Robinsons to the south and May Company to the north. Pacific Theatres' Pacific 4 occupied the uppermost level of the project. The Galleria became famous in the early 1980’s as the center of teenage mall culture and a well-known teenage hangout as well as being immortalized in “Fast Times at Ridgemont High” and “Valley Girl.” In 1993, Robinsons and May Company merged, and both stores in the mall were converted to Robinsons-May, the north store becoming a Men's and Home store, and the south store becoming a Women's and Children's store. The next decade saw business at the Galleria decline. In January, 1994, the Galleria closed for 11 days for repairs following the 1188 70 Northridge earthquake, and although the Galleria reopened quickly, Robinson-May its south store for four years; many smaller stores on that floor closed. During that closure, the Galleria suffered due to having only one main anchor store. Closures continued through the late 1990’s. The Galleria closed in April, 1999 for a major renovation and reopened in 2002 as an open-air center. The only remnant of the original mall is the court where ArcLight Cinema is located, on the uppermost level of what was previously the southern Robinsons-May store. The majority of the remaining mall was turned into offices. Toady’s retail tenants include Urban Home, DSW Shoe Warehouse, 24-Hour Fitness, Paul Mitchell-The School, and restaurants including The Cheesecake Factory, P.F. Changs China Bistro, El Torito Grill, and Fuddruckers. The Sherman Oaks Galleria also houses over 3,500 office workers on site daily as well as over 9,500 employees populating the neighboring Douglas, Emmett offices. The Sherman Oaks Galleria has over 3,500 parking spaces. Vallco Repositioning Alternatives The retail sales and leakage analysis suggests that injections of sales for general merchandise, where the sales are primarily derived from Target and the three Vallco Shopping Mall anchors, is an indicator that while Vallco has significant inline shop vacancy, and is underperforming relative 1189 71 to more upscale traditional malls such as Valley Fair or Stanford Mall, the anchor stores still function as a regional draw drawing shoppers from outside Cupertino. Put differently, Vallco represents a mixed picture for Cupertino: Its commodity and specialty anchors both drawing shoppers to the City while the moribund in-line component contributes to Cupertino’s weakness in comparison goods shopping and destination retail. The questions about Vallco is whether there is an opportunity to create a meaningful destination (ie. specialty) retail environment combined with what essentially amounts to commodity anchors, and whether this environment be a purely retail one, or retail as part of a mix of uses that might include residential, office, and/or hospitality. To this end, the demand daytime workers generate from purchases near their place of work, especially meals eaten during the workday, or shopping done on the way to or from work could move Vallco towards a tipping point that might influence its redevelopment. The public sector could play a meaningful role in the repositioning process. For example, using a power of eminent domain to gain control of all or a part of a project, or to eliminate covenants standing in the way of development are powerful tools. Sears’ attorney, Ivor Samson, noted that while redevelopment agencies have been disbanded in California, it has yet to be established if Successor Agencies will be permitted to exercise a power of eminent domain in the public interest. The public sector also has the ability to invest in projects and to eliminate barriers to redevelopment, for example through bonding tax increment, or through thoughtful land use designations and zoning. Three of the key General Plan Amendment goals are: • Goal 2: Identify and analyze potential increases to commercial (retail), office, mixed-use and hotel development allocations within the study areas. • Goal 3: Enhance and improve the overall commercial experience in Cupertino by retaining existing business and attracting new companies. • Goal 4: Revitalize the Vallco Shopping District so it becomes a cohesive, vibrant shopping and entertainment destination that serves both the region and the local community. Two repositioning scenarios have been created for Vallco Shopping Mall. The purpose of the two repositioning scenarios outlined below will be to inform the decisions to be made in response to these goal statements. Repositioning Scenario 1: An ideal mix appealing to Cupertino and extended trade area customers without regard to entitlement or site constraints This first scenario describes an ideal mix which might appeal to Cupertino’s citizens as well as to residents of the larger Trade Area, and does not take into account required approvals or encumbrances presently in place in the Study Area. Vallco Shopping Mall is governed by a COREA, a document that establishes building and parking requirements, and use requirements and restrictions among other things (see details above). In addition, various tenant leases contain exclusive use clauses and further restrictions 1190 72 on competing uses as well as changes to the Mall’s common areas. For purposes of this alternative scenario, we are assuming that none of these restrictions exist. By way of background the following findings from the BAE Market Study and Retail Sales and Leakage Analysis will inform this first repositioning scenario: • Vallco operates in a defined Trade Area where retail demand and offerings are relatively balanced, even though they are not balanced within the City of Cupertino proper. • Cupertino proper continues to outpace the surrounding area in terms of income and education levels. • Those employed in Cupertino tend to have higher incomes than in the surrounding areas. • Cupertino has a strong housing market with high median home prices reflecting demand outstripping supply. • Demand significantly exceeds supply of office space. Another large corporate campus is a reasonable expectation for Cupertino in the future. • The City’s existing office space tends not to be configured for the sort of collaborative working environments presently in favor. • Occupancy and average room rate trends lead to the conclusion that hotel demand outstrips supply. An October, 2013 community workshop and an online forum were conducted to gather resident input about the various Study Areas, and about the Vallco Study Area in particular. A polling exercise revealed preferences for various site characteristics: • Stevens Creek: Wide sidewalks and narrow setback of buildings from those sidewalks, outdoor seating areas, rich landscaping (which also recycles storm-water and runoff), enhanced public transportation infrastructure (including bus rapid transit and improved shelters), incorporation of small plazas and parklets, and a mix of uses with retail on the ground floor of residential and office buildings. • Wolfe Road: A mix of uses with street-facing commercial uses with higher densities than those preferred for Stevens Creek. Wolfe Road was the preferred location for a traditional indoor shopping mall, however, a traditional shopping mall generally was not preferred. A block exercise was also conducted. In this exercise, participants where asked to use color- coded blocks to create redevelopment scenarios with desired attributes. An example of this exercise looked like the following: 1191 73 The following characteristics were frequently cited in the block exercise: • Remake Wolfe Road into a “Main Street” with retail and other commercial uses fronting the street. • Design the project so that Wolfe Road and Vallco Parkway become the dominant retail corner. • Incorporate enhanced landscaping, seating, etc. into the streetscape. • Increase connectivity within the site and with adjacent projects (ie. Rose Bowl, Main Street), and mobility for pedestrians and bicycles. • Consolidate parking on the north end of the site closest to the freeway, thereby hiding the parking and creating a noise barrier. • Consolidate office near the freeway for the same reasons as parking. • Create an indoor-outdoor environment including outdoor destination features such as public spaces and parks within the project. • Increase densities including a mix of uses with residential or office uses over ground floor retail. A few specific uses were called out in addition to general references to retail, residential, hotel, and office. These included creating nightlife, retaining Sears and AMC, and adding a bigger mix of restaurants. A few interesting ideas were generated by individual groups. These included keeping Sears in its present configuration as a defense against high rise development; having big-box retailers face Wolfe Road with parking behind the stores; consolidating residential on the part of the Study Area east of Wolfe Road; and, creating residential along the west border of the Study Area as a buffer between the Study Area and existing single family homes to the west. 1192 74 Two groups cited specific projects: The Grove and Museum Square in Los Angeles, and nearby Santana Row. Common elements shared among these projects include the creation of a retail street or even a street grid, and increased densities including the integration of other uses such as office, hospitality or residential. Implications of Suggestions The criteria cited by the various groups logically lead to a number of other considerations. For example, Wolfe Road carries 27,390 cars daily. Wolfe Road being a main arterial providing access to I-280 may be at odds with significant traffic calming and it becoming a retail "Main Street." In order to be a "Main Street," traffic calming, on-street parking, creating a narrower thoroughfare (perhaps by removing the median and narrowing lanes to 10½ feet), and other features aimed at enabling pedestrians to see, cross, and access shopping options on the other side of the street would need to be implemented, taking into account balancing traffic and place-making objectives. In addition, the Apple Campus 2 is anticipated to add a significant amount of traffic to Wolfe Road between I-280 and Vallco Parkway: The Apple EIR (Appendix B, p. 38) estimates that the Apple Campus 2 will generate 35,106 net new daily vehicle trips when at full occupancy. Over 50% of the morning and evening peak hour trips will be through the Wolfe Road Main Driveway north of I-280, and it is anticipated that Wolfe Road to Vallco Parkway to Tantau Avenue will be a key alternate route, increasing today’s Wolfe Road traffic counts. Circulation and turning movements will need to be studied in order to accommodate the additional Apple traffic as well as the additional traffic generated by a redeveloped Vallco project. Since access and parking are key to the success of any suburban, auto-oriented retail project, even a densely planned one, the impact of increased Wolfe Road and Vallco Parkway traffic counts on these site attributes will need to be studied as well. Related to Wolfe Road and Vallco Parking design is improving connectivity with other adjacent or nearby projects. One of Vallco's most notable attributes is the pedestrian bridge connecting the portions of the project on either side of Wolfe Road, and the bridge could continue to serve this purpose regardless of how the project is redeveloped. The bridge could also be reengineered as an open bridge similar to the following picture of a similar amenity in Century City in Los Angeles. 1193 75 Additional connections will need to be made between the portions of Vallco on either side of Wolfe Road and the Rose Bowl site, the office site on the NEC of Stevens Creek and Wolfe Road, and eventually to the Main Street project to the east. Whether additional pedestrian bridges are constructed or crosswalks are created, there will be significant cost associated with crossing these streets as well as accommodating the paths of travel and way-finding signage for the various non-Vallco projects east of Wolfe Road. Many groups also mentioned improved access to public transportation. Curb cutouts for bus loading and shelters will need to be considered when designing the overall site plan. Decisions about creating a transit hub, and whether to integrate that hub with the Apple Campus 2, will also need to be considered. Among other options, many of the groups called for site configurations that would necessitate large parts or even the entire existing mall being significantly reconfigured or even razed including both large format retailers and shop space facing Wolfe Road. The process of reconfiguring an existing mall is often referred to as “demalling.” Nearby Westgate Shopping Center in San Jose is an excellent example of a former regional shopping center that was demalled. Westgate originally opened in 1960, but starting in the late 1980’s and continuing through today has been reconfigured mostly with outward-facing commodity retailers such as Ross Dress For Less, Nordstrom Rack, Target, Old Navy, Any Mountain, Michaels, Hancock Fabrics, Party City, and a Wal-Mart Neighborhood Market that replaced Safeway in 2012. Many groups indicated a desire for increased open space. The Vallco land has a basis which could be defined in the simplest terms as the purchase price plus investment made in the project less depreciation. Any owner or developer will be looking for a return on any investment they might make. In the case of a redevelopment, that would mean a return on the basis plus any investment anticipated to be made. Open space by definition would not be developed with income-producing assets, but would require investment to create amenities such as seating, landscaping, play areas and the like. This open space would also have associated maintenance expenses in perpetuity. Thus, in order to achieve any particular desired return on investment, the open space either requires a subsidy, or it places a higher burden on the balance of the property that is to be developed. In order to accommodate this higher burden, the balance of the property will need to be of greater density than might otherwise be required, however, expected income is a function of supply and demand for the sort of space that is built, and not of a “build it and they will come” wish. There is another balancing act with respect to construction costs: Costs increase significantly once buildings can no longer be block or wood frame construction, so if taller buildings are required in order to achieve enough leasable area to offset the loss of buildable land that has been dedicated to open space such as parks, some combination of yet more density and/or higher rents might be required in order to offset these increased construction costs. To the extent the market supports higher buildings and greater density (ie. users are interested in these spaces and will pay rents needed to justify their construction), allowing greater heights and densities may improve development pro-formas and by extension incent the demolition of Vallco in favor of a complete redevelopment. Many groups indicated a desire for parking to be hidden, and several groups designated parking areas to be adjacent to I-280. Another option to hide parking is to create structured parking either above or below ground, either of which are significantly more expensive to build than surface parking (subterranean parking is yet more expensive than above-ground structures). Cost is not the only consideration when planning parking. Retail places a premium on convenience. Visible and easily accessible parking combined with a proximate path of travel 1194 76 to and from the retail shops contribute to “convenience.” Parking on the far north end of the site would not meet these important criteria. Parking for The Grove, a destination regional shopping center mentioned above, is primarily housed in one large parking structure. This structure has the unique characteristic of being extremely well designed in terms of ease of use and vertical transportation for vehicles and pedestrians alike. It is also situated in the geographic middle of the Grove, minimizing the proximity issue previously mentioned. Virtually all groups indicated a desire for a mix of uses. Mixed-use projects for a variety of reasons are inherently more complex to design, build, and manage than single use projects. For example, in projects where a retail use occupies the ground level and residential or office uses occupy upper levels, there will likely need to be structured parking, vertical transportation (ie. stairs, elevators, escalators), and separation of public and private facilities. Residents do not want to share parking with retail shoppers, so parking entrances, parking areas, and vertical transportation must be segregated from the same facilities for retail customers and shop- keepers. While this segregation also addresses security issues, there will likely be a need for additional on-site security to satisfy residents and shoppers alike. Both vehicle and pedestrian circulation patterns will need to take into account separate residential/office and retail driveways and visitor lobbies, each with their own identity. Loading docks, trash, utilities, and other building systems will also need to be segregated, further complicating design and adding cost to construction. 1195 77 Type and Size of Project, Likely Uses The Vallco Shopping Mall land is a unique, large piece of property in an area with high land values (the nearby Main Street site was purchased by Sand Hill Property Company for $65 million or almost $85.76 per square foot in 2008). High land values reflect high demand and higher rents. Few large tracts of land are available for redevelopment at any price, and while the price paid for the Main Street site may or may not have been too much, it can certainly be concluded that land in Vallco’s immediate area is valuable. A dense, mixed-use project incorporating a variety of uses is likely a financially viable option for this valuable site. Demolishing most or all of the existing improvements will most likely be deemed the best alternative, and would also be the easiest path to creating an indoor-outdoor environment. For example, an “ideal project” (i.e. one conceived for purposes of this Repositioning Scenario 1) might have three distinct areas: Wolfe Road as a retail “Main Street”, an office, hospitality, and residential component west of Wolfe Road, and a commodity retail project east of Wolfe Road is one possible configuration. Following are some specific attributes: • Create a retail boulevard along Wolfe Road. • Narrow Wolfe Road and add on-street parking, wider sidewalks, and enhanced street- scape and landscaping. • Place retail and perhaps office or residential entrance lobbies so they face Wolfe Road (and create easy paths of travel from parking facilities). • Determine if the existing anchor tenants would or would not be a part of a redevelopment plan. • Separate big-box tenants from multi-family and office components, perhaps with retail east of Wolfe on land presently owned by JC Penney, and office, residential, and hospitality west of Wolfe Road. • Consider incorporating uses such as a university satellite or extension campus, or ambulatory medical uses. • Consider from a design and engineering perspective if AMC can remain in-place (ie. “in the air”), or if an on-site relocation would be necessary. • Create an interior circulation system to route visitors to and from parking facilities serving the specific uses they had come to patronize. • Create residential development near existing residential suites and the least compatible commercial use (i.e. commodity retail) east of Wolfe Road, adjacent to existing commercial uses. Note, however, in the alternative a good argument could be made that office or residential uses designed to tie into the new Apple Campus 2 should be assembled east of Wolfe Road. Retail Tenant Mix Two mutually-distinct retail components are likely: a Main Street specialty component and a big-box commodity component. The retail fronting Wolfe Road would likely be made up of considerably smaller shop tenants and eating and drinking establishments than the retail presently in Vallco Shopping Mall. Displays and seating areas on wide sidewalks would be encouraged and protection from the elements integrated into the design. Retailers and restaurants would serve the dual purpose of catering to Cupertino’s large daytime worker population and offer an expanded offering in the evenings for residents. While predominantly 1196 78 specialty in nature, some daily-needs (i.e. serving, commodity) retail should be particularly encouraged to cater to the weekday users. This retail would be expected to compete favorably with the planned retail on Main Street because of the higher traffic on Wolfe Road. The focus of retail along Wolfe Road might sound reminiscent of Santana Row, however, it should not be thought of in those terms. Santana Row is a unique environment, located at a major intersection (with far more traffic than Stevens Creek and Wolfe Road), near two major freeways, and in the retail nexus of one of the more successful regional malls in the United States. In other words, it is simply different. The Wolfe Road retail offering would be much smaller than Santana Row, need to integrate with adjacent non-owned projects such as the Rose Bowl and Main Street, and more likely to resemble a nearby downtown as is found in Campbell, Los Altos, Mountain View, or Palo Alto’s University and California Avenues. These users could be assembled in the land presently occupied by JC Penney and its parking facilities, thereby creating a project-within-a-project which would have a distinct commodity retail identity. Segregating destination retail from other uses would have the benefit of minimizing retail-oriented vehicle trips and parking impacts on residential or office uses. At the same time, overlapping parking facilities for the commodity retail component and the Wolfe Road specialty retail component are feasible. The retail sales and leakage analysis revealed that, with respect to commodity retail, the Trade Area has a balanced retail offering, while Cupertino actually leaks retail dollars to other parts of the Trade Area. Introducing commodity retailers might help recapture some sales as well as capturing other sales from outside the Trade Area. Place-Making Considerations The creation of the three distinct areas as described above, Wolfe Road as a retail “Main Street,” an office, hospitality, and residential component west of Wolfe Road, and a commodity retail project east of Wolfe Road, would inform place- making considerations. The location and size of enhanced street-scape and open spaces within the projects would be one key consideration. Likewise, integrating these amenities into the various districts, and with the uses within those districts (and even with other nearby projects) by creating vehicular, pedestrian, and bicycle paths-of-travel, and way-finding signage will be critical. 1197 79 Apple Campus 2 The Apple Campus 2 is designed to accommodate over 14,000 employees at full occupancy. A redeveloped Vallco site will need to take this significant project into account. For example, while there are benefits to placing a destination retail project on the other side of Wolfe Road from office and hospitality uses, the area east of Wolfe Road might be better designated for office and hospitality, rather than for retail, in order to create the most convenient proximity of these uses to the Apple Campus 2. Another option would be to extend Wolfe Road’s “Main Street” district onto Vallco Parkway. Regardless of how a redeveloped Vallco is designed, creating a “front door” that invites integration with the Apple Campus 2 should be a key site planning consideration. Development and Entitlement Issues Creating certainty with respect to required approvals and the process for obtaining them will be key to the Study Area’s redevelopment. The Vallco Study Area is already zoned for a mix of uses, however, reconciling the highest and best mix of uses with corresponding allocations for those uses will remove a barrier to the Study Area’s evolution. Likewise, removing or streamlining the need for conditional use permits, stating key desired design criteria and articulating the required community outreach and approval process (ie. design review, planning commission, or City Council) will have a positive impact on development planning efforts. 1198 80 Repositioning Scenario 2: Assume market factors such as competing projects and legal limitations such as those contained in the COREA and land use regulations As discussed, Vallco operates in a retail environment dominated by Valley Fair and Santana Row, Westgate Shopping Center, Stanford Shopping Center, and other downtowns and Main Street areas such as Downtown Los Altos, and perhaps Sunnyvale Town Center once it’s redevelopment has been completed. The area in which Vallco is located is governed by the South Vallco Master Plan. While zoning allows for a mix of uses including regional shopping, general commercial, office, hotel and residential, a development agreement allowing for the development of certain of these uses has expired. The project is governed by the COREA, as amended, as well as various lease restrictions and other agreements. These documents establish building and parking requirements, and use requirements and restrictions among other things. In addition, various tenant leases contain exclusive use clauses and further restrictions on competing uses as well as changes to common areas of the projects. Type and Size of Project Mike Rhode, Vallco’s general manager, commented when interviewed that the only way to solve Vallco is to purchase the anchors. Based on our interviews with the anchors, we do not believe this purchase is likely to be achieved, however, we are aware of at least two redevelopment schemes that have been developed over the past decade that incorporate the anchors. The past schemes are notable because each involved some level of discussion and negotiation with the anchor tenants whose approval would be required in order to move forward with a plan. In other words, they establish that the anchors were willing to discuss a redevelopment. The stakeholder interviews with Sears, Macy’s, and JC Penney all confirmed that the majors remain open to and willing to discuss a redevelopment strategy today. Furthermore, assuming a mutually agreeable plan can be designed, cooperation is in each of the anchor tenant’s best interest. Probably the biggest hindrance to such a conversation happening is the current owner’s lack of experience, obvious credentials, and apparent interest in executing a redevelopment plan. This alternative analysis will assume that ownership is interested in pressing forward with a redevelopment. 1199 81 Receiver’s Plan c. 2002 Grammercy Plan c. 2007 Both of these plans call for a mixed-use environment, but neither address what is almost certainly an excess of retail space on-site, nor today’s moribund atmosphere (i.e. retaining or rebuilding existing infrastructure). As noted in Maryia Hodge’s paper, trends today are favoring alternative formats and even the resurgence of downtowns in certain circumstances. Cupertino has never had a downtown per se, however, Belmar, Mountain View, and Englewood are all examples of creating a downtown-esque environment where none had previously existed by establishing a critical mass of commercial and residential uses. In each case, density becomes the magnet. Uses and Tenancy There are other product mix and tenant merchandising decisions that will need to be made. For example, the importance of incorporating an Asian-theme to reflect the community’s demographic and ethnic makeup, relocating JC Penney to the west side of Wolfe Road (freeing the entire portion of the Study Area located east of Wolfe Road for redevelopment), idenfiying the most appropriate mix of retail and non-retail uses, and taking the Apple Campus 2 into account are all critical to formulating a redevelopment plan for Vallco. While the City of Cupertino’s residents are 63.1% Asian, Santa Clara County is only 31.7% Asian. The retail sales and leakage analysis observed that while Cupertino is leaking sales to the defined Trade Area, that Trade Area is relatively balanced with respect to sales leakage. This balance would indicate that if Vallco is seen as a regional destination, the project’s makeup certainly might include a variety of tenants catering to the needs and tastes of the large Asian community, however, it should not be a so-called “Asian center” per se. Relocating JC Penney to the west side of Wolfe Road accomplishes two goals: It is consistent with JC Penney’s stated desire to monetize their land holding while still maintaining a downsized presence in the project, and it frees 19.07 acres of land east of Wolfe Road for redevelopment (4.27 owned by the mall, 2.12 by KSR, and 12.68 by JC Penney). There are relatively few, if any, well located land parcels in Santa Clara County of this size, and the residual land value would be expected to be quite high. The BAE Market Study identifies demand for office, hospitality, and residential uses. Demand for younger knowledge workers, referring to residential opportunity, was specifically mentioned. 1200 82 The 19-plus acre site could support a significant amount of office, housing, or both. Hospitality uses could be easily incorporated on either side of Wolfe Road. From a use perspective, all of these uses would complement the Apple Campus 2. Also, it is our understanding that the Apple Campus 2 is designed only to meet current needs, and there will be additional future office demand. First class, high density for-sale or for-rent housing will certainly be in demand, and given that this sort of housing is not ideal for families, it may be a palatable proposition to the community given sensitivity to overburdening the local school system. Land East Versus West of Wolfe Road With the hypothesis that the land east of Wolfe Road is highly desirable for development, and that it could actually be freed for such development, addressing the portion of Vallco west of Wolfe Road becomes the key topic. Parking, and especially structured parking, is expensive to create. There are significant existing parking facilities on the west and north sides of the existing mall, so to the extent these facilities do not need to be relocated or rebuilt, the cost of a significant rehabilitation to the project becomes financially more manageable because returns will be that much easier to achieve. In either scenario, the climate in Silicon Valley is normally temperate year round, and thus conducive to creating an open-air environment. Integrating this open-air environment with what would become AMC’s “skybox” location will need to be addressed in the design development phase of the project, but we believe it may be deemed possible from a structural perspective. An open-air environment will also make establishing connections with adjacent projects easier. The amount and mix of tenants west of Wolfe Road is an important consideration. Given the 128,789 square feet of retail space planned for the Main Street project, we recommend that the 536,794 square feet of mall/shops space be reduced significantly. Without doing site planning exercises and corresponding pro-formas, which were not a part of the scope of work for this Report, it is difficult to determine the ideal amount of space. There are two most likely scenarios: A demalling, which would combine a JC Penney on-site relocation as shown on the 2002 plan with ±100,000 square feet of shop space (this is intended as a starting place from which to determine the ideal amount of space) on an axis between Sears and Macy’s combined with some commodity retail (e.g. Ulta Cosmetics, a pet retailer, or Best Buy or Office Depot’s new smaller concepts). Additionally, some Wolfe Road-facing retail could be integrated into the new design. An alternative scenario would be to combine the shop space with non-retail uses such as office or hospitality. Regardless of what scenario is undertaken, it is likely that the project’s GLA will actually be reduced. This reduced mall GLA would allow the development of outparcels without putting an undue burden on existing parking facilities. Retail Tenant Mix Vallco already has two full service restaurants: TGI Fridays and Alexander’s Steakhouse, however, neither is well integrated into the Study Area’s existing pedestrian flow. The Mall’s food court is not compelling with respect to atmosphere or selection of food operators. Creating a path of travel for Friday’s and Alexander’s as well as augmenting the food offerings will be key to a successfully revitalized Study Area’s success. Valley Fair’s dining terrace might 1201 83 give guidance to the sort of quick-serve food uses that should be considered. Likewise, borrowing from Santana Row’s restaurant success should be studied. In both cases, the food uses are designed to integrate with the surrounding uses, either through adjacency or by literally spilling out of their spaces onto adjacent sidewalks. Regardless of the amount of retail to be included in a revitalized project, fashion will be an important part of the project’s identity. The BAE Market Study notes that the lack of clothing and apparel-related stores is due in part to the lack of destination retail centers in Cupertino, and, in part, from competition with Valley Fair and other fashion-driven projects. Fashion tenants could run the range from ubiquitous national tenants such as Gap Inc., Osh Kosh, Abercrombie & Fitch, Hollister, Zara, Bebe, Sketchers, or Juicy Couture. Alternatively, attention could be focused on a cluster of active lifestyle concepts such as The North Face, Columbia, or Under Armor. While not offering the same credit, a decision about whether to include local or regional tenants will help create the project’s identity, and differentiate it from other competing projects…creating an all-important message. In urban areas, high costs and other barriers to entry have limited the development of commodity retail projects, so there is significant pent-up demand. If a demalling strategy were to be pursued, candidates for larger spaces might range from Ulta Cosmetics to commodity tenants such as a pet superstore, or Office Depot’s new smaller concept. As no major electronics stores exist in Cupertino (although Sears carries a large variety of appliances), the project might present an opportunity for Best Buy’s new smaller concept store. Other categories might include value-oriented soft-goods retailers like Ross Dress for Less, DSW, H&M, or Uniqlo as their rollout matures. Alternative uses might help give the project a unique identity. Apple, possibly the most sophisticated omnichannel retailer in the world, is headquartered in Cupertino, and does operate a company store at its headquarters that is open the to the public and is promoted as “the only place in the world that sells Apple logo t-shirts, caps and accessories,” however, the closest Apple Store is located at Valley Fair Shopping Center. Vallco’s proximity to Apple’s headquarters might present Apple with the opportunity to consider opening an Apple flagship store that ties into Apple’s HQ. Another example might be including other healthy lifestyle alternatives to compliment The Bay Club, such as a pilates studio, or even incorporate an open air climbing gym, which might be today’s analog to the ice rink and merry-go-round of yesteryear. Whatever the alternative uses, they should have the multiple roles of promoting the uniqueness of Vallco, giving the customer reason to visit and to linger, and of being active uses that engage the consumer and the community. Place-Making Considerations Creating a project with a sense of “place” requires thoughtful decisions regarding use of storefront design, store and project signage, way-finding signage, materials, lighting, tenant mix and location, indoor-outdoor connections, and amenities such as seating, light, and shade. While authenticity should be a consideration, we do not believe there is any particular emotional connection between the consumer and Vallco that is worthy of preserving. In this case we would recommend NOT maintaining “continuity of place,” and instead suggest that an exterior remodel is an important component of any repositioning strategy as it would convey 1202 84 the all-important message that “there is something new here” to consumers. An excellent example of such an exterior remodel strategy is the Sherman Oaks Galleria: Before After A large-scale redevelopment east of Wolfe Road combined with the Rose Bowl project, the Main Street project, and an overhaul of Vallco’s infrastructure west of Wolfe Road gives rise to opportunities to create connectivity between all projects, and to create a “city center” for the community. On a smaller scale, careful consideration must be given to tenant placement, configuration of indoor-outdoor areas and parklets where patrons might be encouraged to gather and linger, protection from the elements, store and way-finding signage, and use of inviting materials throughout the various projects in and adjacent to the Study Area. The Mall’s “back of house” is relatively well designed in that it allows for deliveries and loading, trash service, truck path-of-travel and the like without significant impacts on the project or the public. These facilities will still likely need to be redesigned as part of a remodeling effort so as not to interfere with neighbors, a new site plan, or with newly introduced non-retail uses. Finally, JC Penney is a mid-market department store that generally does not have the same top-of-mind association with newly gentrified retail and mixed-use projects. Creating an identity that is fresh, appealing, and reflective of the community’s demographic makeup, and not diluted by these brands will be a balancing act. We believe that focus on a broad mix, fresh alternative uses, a mixed-use environment, and attention to place-making consideration will help overcome this hurdle. Development and Entitlement Issues Most importantly, in order for a redevelopment to take place, the property needs a basis that makes reinvestment possible. The present owner’s purchase price was $64 million. This price equates to $4.48 million in net operating income at a 7.0% cap rate, or $3.84 million at a 6% cap. Actual net operating income today is unknown, but in 2007 it was just under $2 million. Note that gross income was significantly higher, but the high vacancy level required the owner to pay for operating expenses that ordinarily would be reimbursed by retail tenants, which typically operate on “triple net” or “NNN” leases where the tenant reimburses the landlord for operating and maintaining costs, insurance, and property taxes. If occupancy levels were to increase, top-line income would rise at the same time that the share of operating expenses the owner needs to pay would decrease. 1203 85 Significant reinvestment will be required to reinvigorate the Mall. While grossly oversimplifying the economic model, the following gives some perspective about the required investment: In 2002, the receiver estimated that a $51 million investment would be required (not including land or demolition costs) to execute its redevelopment plan (site plan above). The CPI (probably a conservative measure for purposes of calculating construction costs) has risen 30% since that time, equating to over a $66 million investment today, again not including the cost of land, demolition, or concessions to tenants who hold approval rights over changes to the Mall. The net operating income required to support the original basis plus this level of investment would be $9.1 million at a 7.0% cap, or $7.8 million at a 6% cap. In other words, a significant investment, a leasing plan that increases net operating income from $2 million, and the time and expertise to achieve all three are required. In addition to creating a financially viable development plan, approvals will need to be sought to execute that plan. It is not known at this time what mix of uses or tenants might be sought, however, the area has the potential, with the Rose Bowl and Main Street projects, and close proximity to Apple’s headquarters, to form the basis of a commercial City Center for Cupertino. Absent being able to use its power of condemnation or to provide a public funding mechanism, removing barriers to development is a key contribution the City could make in this instance. The area has already been designated for multiple commercial uses including retail, office, hospitality, and for residential uses. The City has a history of creating allocations for these various uses. The economy and the real estate market ebb and flow over time making one sort of use more or less commercially viable at any given time. It is recommended that the City set aside allocations in the Vallco Shopping District that will allow a developer to create various development scenarios with the knowledge of what is achievable from an entitlement perspective. Execution will be important. The owner will need to partner with a leasing team and a management company that are experienced lessors and operators of regional retail and larger- scale mixed-use projects. The leasing partner will also need to be able to compete effectively against Westfield which has a vested interest in a Vallco redevelopment not taking place. The anchor tenants with approval rights over changes to the project have a balancing equation to consider: What is the right balance of concessions with the upside of anchoring a once-again vigorous project. The owner-developer will need to carefully negotiate these tenant approvals to allow for both the financial and planning aspects of the project to be successful. Any partner should have relationships with the anchor tenants, as there are some significant issues to overcome. For example, it is our understanding that due to a co-tenancy provision in AMC’s lease, the Mall’s vacancy rate reduces AMC rent to a fraction of its contracted rent. AMC’s sales are reported to be strong. AMC thusly has a vested interest in the status-quo since it is quite possible that not enough incremental customer traffic could be generated, even by a successful redevelopment, to make up for the differential between its present minimal occupancy cost and the rent called for in its lease. A strategy for gaining AMC’s needed approvals might be to amend their lease, replacing their contracted rent schedule with a blending of their contract and their current rent. 1204 86 NON-VALLCO RELATED STAKEHOLDER INTERVIEW FEEDBACK A number of interviewees commented on City characteristics. These comments ranged from recognition of the City’s generally high education levels to its Asian-influenced ethnic makeup. One pointed out that some retailers will think that incomes and education levels are too high to consider opening in Cupertino, including some general merchandise and grocery discounters (examples might include dollar stores or Grocery Outlet). • It was also noted that contrary to development trends in some surrounding areas (for example, Merlone Geier’s Mountain View project), the City does not have much dense mixed-use development that is substantial in scale, well-designed, and well-built. This lack of mixed-use product was viewed as curious given apparent redevelopment opportunities like The Oaks. Another observed that Cupertino is a hidden gem, and has the potential to benefit from business growth as Sunnyvale “was supposed to.” One Cupertino property owner commented that density would help economic development, but feared the ramifications of having that comment attributed to him and his employer’s holdings. • A retail real estate professional knowledgeable about the Cupertino retail market noted that De Anza, Stevens Creek, and Homestead have the traffic counts needed for retail development, while another noted that the De Anza corridor is viewed as being well located for retail development, however, traffic is so great on De Anza that retailers would lose impulse visits because potential customers do not want to fight the congestion. • Many stakeholders commented that residents do not like change. A stakeholder observed that Cupertino is home to one of the world’s highest profile companies, that Cities evolve (neighboring cities like Santa Clara are embracing opportunities brought by high-profile high-tech companies), and that an opportunity is being missed not even trying to meet today’s housing and amenity demand created by younger knowledge workers. More than one person acknowledged the fear that any new housing will have a detrimental impact on schools, and one wondered why contributions for new school facilities were not part of conditions of approval for new residential projects (it should be noted that SB50 limits the City’s role in imposing additional school impact fees over those allowed by AB2926). Some stakeholders identified concerns about government and the development process that are seen broadly through the Bay Area. For example: • Several stakeholders expressed views that the Planning Commission and the City Council were not aligned about supportiveness to change. Some held the view that the Planning Commission has been supportive of new development, but this view was not uniformly held with respect to the rest of City government. • Some stakeholders felt the City was good to work with on the entitlement process and obtaining approvals, while others expressed reservations. 1205 87 • Other stakeholders commented that staff and Council often had a different vision than developers, and by way of example noted that the City’s hesitation in approving the Biltmore project at its fully allowed density was disappointing. • The perception City government opposes significant development despite demand. • A concern that policy-makers have a comprehensive knowledge of real estate and development. • A view that developers are market driven, and policy-makers would benefit to developers’ analysis of what the City needs, and their market-based point-of-view of development economics. Other stakeholder comments more specific to Cupertino included: • A desire that the decision-makers be more open minded about allowing the City to grow economically. • A concern the City is reluctant to approve new office space because ABAG would then allocate additional RHNA numbers to meet jobs-housing balance requirements. • Confusion was expressed about whether City government or the community has a preference not to grow in a significant way. It was noted that if there were not resistance to new development, there would be opportunities all along Stevens Creek and De Anza for both commercial and residential redevelopment. • A perception the City lets itself be bullied into decisions. The example cited was Main Street being approved with senior housing, but soon after the housing component was approved by the decision-makers, that housing being converted to market-rate at the developer’s request. • A perception that decision-makers over-weigh concerns of conservative residents who do not want change. This person also indicated that the people who take the time to go and speak at Council meetings are generally those that don’t like the project or some aspect thereof. Supporters do not take the time to go to hearings. • One stakeholder suggested that older citizens don’t want any change, citing as an example (perhaps as a stereotype) an older citizen who appeared before the Council to request signs only be in English. Finally, a number of stakeholders offered opinions about prospects about Cupertino and about some of the Opportunity Sites specifically: • While it is a nice idea not to be car-dependent, it is unrealistic to think [the Trade Area] will detach from the car, so there will need to be retail catering to impulse shopping that is well designed with clear retail identity and easy parking for customers arriving by car and not some other means. • Traditional retail requires a low FAR (0.25 at most). The best case for land values for this FAR would be $50-60 PSF which is substantially below market for other uses. For example, the 3-acre southwest corner of El Camino Real and Wolfe sold in 2012 for $110 PSF. In order for retail to be developed, need to zone property for retail and keep that property zoned for retail, or owners will hold out for more money for a different use. • A number of stakeholders expressed optimism that Cupertino has many opportunities going forward. Future development can be built around Apple’s highly identified presence in the City. 1206 88 • The City’s central location in Silicon Valley makes it a prime opportunity for redevelopment as compared with other cities. Other opportunities cited include: • Providing places for young talent to live and to enjoy the community is important to the City’s evolution. The line at BJ’s was seen as showing how few places there are in the City to go out after work. The City needs more gathering places. It is hoped that Main Street will help fill this void. • Economics for building hotels don’t yield a much higher residual land value than retail. While a five star hotel might be desired, select service models are more profitable and easier to finance. A 2.0-2.5 acre site where a hotel can share parking with office would make a good hotel development opportunity. • Forever 21 was rumored by one stakeholder to have commented that they would not come to Vallco even if they were given free rent. This comment is no doubt a reflection of the project’s condition and lack of tenancy and less a comment on the desirability of Cupertino per se. If Vallco were to be redeveloped and retailers had a reasonable expectation of co-tenancy, stores like Forever 21 would be expected to at least evaluate whether the project and area met their criteria for a new store opening • Transit in particular would allow for opportunities for growth while minimizing traffic impacts. 1207 89 RECOMMENDATIONS Cupertino was originally conceived and planned as an auto-oriented, suburban environment. This suburban model is evolving as population and population density increases, and as once distant suburbs find themselves increasingly at the center of population centers. As Cupertino decides if and how it intends to embrace increased density and mixed-use projects (an increasing trend in real estate development and redevelopment in the Bay Area and beyond), careful consideration should be given to retail design (location, visibility, access and circulation, signage, parking, appropriate convenience attributes, etc.) with an eye to ensuring that design trends do not trump basic functionality. This applies both to commodity and to specialty retail projects. Shopping patterns generally are not limited by city or county borders. Cupertino residents have many alternatives for both commodity and specialty retail venues that are close to but not necessarily within the City limits. Trader Joe’s is one excellent example. Significant successful retail exists along El Camino Real in Sunnyvale, at Westgate Shopping Center in San Jose, Valley Fair and Santana Row at the intersection of Stevens Creek and Winchester (and I-880 and I-280), and downtown districts in Los Altos, Mountain View, Los Gatos, and Palo Alto. • The City government and residents alike are widely viewed as being conservative about approving new development projects, particularly projects with residential components. We recommend using the feedback from the community process that has been a part of this planning effort, and additional workshop(s) as needed including elected officials, planning and economic development staff, the community, and retail development professionals aimed at creating a mission and values statement about retail development and redevelopment in Cupertino, and whether capturing retail sales presently occurring outside the City limits is desired. Such a statement would provide a consistent baseline against which project sponsors can plan, and staff and Council can evaluate and approve projects. This statement could also guide how retail projects should be designed in order to be competitive with offerings outside the City limits if that is desired. • We believe that Cupertino is well located and could attract additional retail. The Opportunity Sites that are the subject of this report have been evaluated for such development. We recommend that other sites that were not part of the scope of this report also be evaluated. The Oaks is one example. • In order to better understand what attributes will be required for successful retail developments in Cupertino and to augment this report, we recommend evaluating the factors that make Westgate Mall, Valley Fair/Santana Row, and other nearby shopping districts frequented by Trade Area residents appealing to patronize. A well-designed intercept survey or on-line poll might suffice. • There is a lack of destination-oriented specialty “lifestyle” and “downtown” areas within the City’s borders. For example, while sit-down restaurants exist, they are generally not in a project or a district where one might park, stroll, cross-shop other merchants, and “hang out.” Cupertino Village may be one of the best examples of a successful destination- oriented specialty project within the City’s borders (despite it actually being a hybrid with commodity-tenant Ranch 99 market in the project). 1208 90 • Some projects have potential to be community-gathering spots, however, they do not appear to be as well patronized as possible. The Oaks is a good example. In these cases, careful consideration of potential audiences and project design may help reinvigorate a stalled project. • There are some blockbuster retail projects in close proximity to Cupertino. Santana Row is one good example. Not every project is for every city. The suitability of a retail project for any given community is a comment on how market forces have evolved over time. It is not a negative comment on the community that does not have a particular facility, even if that facility is desired. Focus on planning retail projects that are best suited to serve the local community’s needs as opposed to replicating facilities found elsewhere (and which are unique to those facility’s individual circumstances) should be a primary planning focus. • Many communities have leanings or policies about requiring retail on the ground floor of mixed-use, and especially residential, projects. Sometimes this retail space is well executed and serves an important purpose. Just as often, it is not as successful as it was envisioned. As discussed in this report, retail succeeds or fails based on demand, and the relative competitiveness of its location and site attributes (especially visibility, access, and parking) as compared with other options. Because residential uses result in higher residual land values than retail, the retail component of mixed-use projects is frequently designed principally with housing and not retail in mind. We assume that the City, the project sponsor, the retailer, neighbors and the community, and customers all want well designed projects that are both aesthetically pleasing and functional (and without vacancy resulting principally from lack of demand or poor design). We recommend that ground floor retail in mixed-use projects be evaluated for its appropriateness on a case-by-base basis, taking location and demand into consideration. We also recommend that when such a retail component is deemed appropriate, that project sponsors be required to retain experts (whether a retail architect, site planner, or other retail consultant) to advise on the size, location, site attributes, and layout/design of the retail component. Redeveloping Vallco will take significant effort on the owner and the City’s part, and the mall is unlikely to be successful without a significant redevelopment effort. Following are our recommendations for Vallco: • Understand owner Son Son Co’s motivation for purchasing the property, and its long-term plans for the property. A significant effort may be required in order to engage the owner and to build a rapport. • Understand Sears’ long-term plans for its property, the extent to which Sears might want to redevelop its parcel and how, and in what ways Sears may or may not be interested in cooperating with a redevelopment effort. • Sears’ attorney brought up an interesting point about whether Successor Agencies will be permitted to exercise their power of eminent domain in the public interest post-dissolution of redevelopment. Hire land use counsel to provide guidance on this point. Depending 1209 91 upon the outcome of this investigation, explore the feasibility of contemning the COREA or certain provisions thereof which impede obtaining approvals necessary to activate a redevelopment of the Mall. • Open a conversation with Apple about it’s interest in the Mall property, and if it is interested the nature of that interest. • Create a vision for Vallco Shopping Center (and do not hesitate to “Think big!”) to be memorialized in a specific plan with the following goals in mind: o Start thinking about the area comprised of Vallco, the Rose Bowl, Menlo Equities, and Main Street as a downtown district. o Identify the amount and type of retail desired for the Vallco property. Retail will likely result in a lower residual land value than office or residential uses, so making clear what portions or how much of the land needs to remain retail and the configuration of that retail (i.e. on the ground floor of a mixed-use development, traditional surface-parked shopping center, etc.) will lead to development underwriting that recognizes some of the land will be used for less than its highest and best use (i.e. most valuable use). Articulate desired uses for the portion of Vallco east of versus west of Wolfe Road. o Create certainty with respect to an approval process: Create clearly articulated design criteria, FAR’s and massing guidelines, and timelines for obtaining approvals. When a developer can see a clear path from underwriting and acquisition to approvals and commencement of construction, it can more easily evaluate the feasibility of a development in terms of anticipated market conditions. o Focus on pedestrian-friendly environments, active ground floor uses, and outdoor uses. o Ensure cohesion throughout the specific plan area by creating better connections, architectural relationships, common spaces and parking between individual properties/ownerships. Address streetscape improvements, reconfiguration of Wolfe Road, and connectivity. Explore Mello Roos districts for improvements and infrastructure. o Be realistic about what visibility, access, circulation, and parking facilities will be required in order for a proposed project to compete with other shopping destinations frequented by target customers. • Every revitalization projects needs a champion! Have the City Council become the project’s advocate. • Be patient, and know when to say: “No!” The plan articulated in a specific plan may or may not be feasible in today’s market and economic climate. Any redevelopment will be something the community will live with for decades, so waiting a few years for the right set of circumstances to converge is preferable to the wrong project today. 1210 92 BIBLIOGRAPHY 1. ULI - Professional Real Estate Development The ULI Guide to the Business, 2012, By Richard Peiser, David Hamilton 2. ULI - Professional Real Estate Development The ULI Guide to the Business, 2012, By Richard Peiser, David Hamilton 3. Gaming Google: The Growing Importance of Omni-Channel, RSR Research, Brian Kilcourse, March 1, 2011 www.rsrresearch.com/2011/03/01/gaming-google-the-growing- importance-of-omni-channel/ 4. Shopping Centers Today, November, 2012 5. ULI - Professional Real Estate Development The ULI Guide to the Business, 2012, By Richard Peiser, David Hamilton 6. Cupertino Square Appraisal prepared by Cushman Wakefield, September, 2007 7. Wikipedia http://en.wikipedia.org/wiki/Vallco 8. Apple Campus 2 Environmental Impact Report 9. October 24, 2013 San Francisco Business Times 10. Cupertino Square Appraisal prepared by Cushman Wakefield, September, 2007 11. Cupertino Square Appraisal prepared by Cushman Wakefield, September, 2007 12. Cupertino Square Appraisal prepared by Cushman Wakefield, September, 2007 13. Wikipedia http://en.wikipedia.org/wiki/Vallco 14. Cupertino Square Appraisal prepared by Cushman Wakefield, September, 2007 15. Wikipedia http://en.wikipedia.org/wiki/Vallco 16. Cupertino Square Appraisal prepared by Cushman Wakefield, September, 2007 17. Grammercy Capital Corporation Offering Memorandum for Cupertino Square Mall, September, 2007 18. Cupertino Square Appraisal prepared by Cushman Wakefield, September, 2007 19. Grammercy Capital Corporation Offering Memorandum for Cupertino Square Mall, September, 2007 20. Grammercy Capital Corporation Offering Memorandum for Cupertino Square Mall, September, 2007 21. Grammercy Capital Corporation Offering Memorandum for Cupertino Square Mall, September, 2007 22. Maryia Hodge while a planning student at San Jose State University 23. J. Thomas Black, Libby Howland, and Stuart L. Rogel, Downtown Retail Development: Conditions for Success and Project Profiles (Washington, D.C.: The Urban Land Institute, 1983). 24. Kevin Mattson, “Antidotes to Sprawl,” in Sprawl and Public Space: Redressing the Mall, ed. David J. Smiley (Washington, D.C.: National Endowment for the Arts; New York, N.Y.: Distributed by Princeton Architectural Press, 2002). 25. Lee S. Sobel, Ellen Greenberg, and Steven Bodzin, excerpt from “Greyfields into Goldfields: Dead Malls Become Living Neighborhoods” in Greater Philadelphia Regional Review (Fall 2002). 26. William Ivey, foreword to Sprawl and Public Space: Redressing the Mall, ed. David J. Smiley (Washington, D.C.: National Endowment for the Arts; New York, N.Y.: Distributed by Princeton Architectural Press, 2002). 27. Mark Robbins, “Redressing the Mall,” in Sprawl and Public Space: Redressing the Mall, ed. David J. Smiley (Washington, D.C.: National Endowment for the Arts; New York, N.Y.: Distributed by Princeton Architectural Press, 2002). 1211 93 28. Nora Ganim Barnes, “The Restructuring of the Retail Business in the US: The Fall of the Shopping Mall,” Business Forum 27, no. 1 (Winter 2005). 29. Joan Fitzgerald and Nancey Green Leigh, Economic Revitalization: Cases and Strategies for City and Suburb (Thousand Oaks, CA: Sage Publications, 2002). 30. Pierre Filion, Heidi Hoernig, Trudi Bunting, and Gary Sands, “The Successful Few: Healthy Downtowns of Small Metropolitan Regions,” Journal of the American Planning Association 70, no. 3 (Summer 2004). 31. Benjamin R. Barber, “Civic Space,” Sprawl and Public Space: Redressing the Mall, ed. David J. Smiley (Washington, D.C.: National Endowment for the Arts; New York, N.Y.: Distributed by Princeton Architectural Press, 2002). 32. Retrofitting Suburbs: Instant Cities, Instant Architecture, and Incremental Metropolitanism, Harvard Design Magazine, Ellen Duhnam-Jones and June Williamson 33. Converting Obsolete Malls, CoStar, October 3-17, 2012 34. Urban Land, July 25, 2013 35. The Town Paper, Fall 2005 36. Merlone Geier, The Village at San Antonio marketing materials 37. Wikipedia http://en.wikipedia.org/wiki/Cinderella_City 38. Wikipedia http://en.wikipedia.org/wiki/Sherman_Oaks_Galleria 1212 HOUSING COMMISSION STAFF REPORT Meeting: August 28, 2014 Agenda Item No. 4 SUBJECT: Draft 2014-2022 Housing Element and associated Municipal Code amendments. RECOMMENDATION: Staff recommends that the Housing Commission recommend that the City Council: 1. Adopt the zoning text amendments (Attachment A to Attachment 1) related to: a. Density Bonus, b. Conformance with State Housing Law and c. Below Market Rate Program 2. Authorize staff to send the Draft 2014 – 2022 Housing Element to the Department of Housing and Community Development for review and certification in compliance with State Law (Attachment B to Attachment 1) 3. Adopt a list of housing sites to be included in the Housing Element that can accommodate 1,400 units in order to meet the Regional Housing Needs Allocation (RHNA) per the criteria list in Attachment C to Attachment 1. BACKGROUND: Housing Element Overview In accordance with State law, California cities must have an adopted General Plan, which must contain a Housing Element. Housing Element law requires that all jurisdictions facilitate housing development by creating policies and adopting land use plans and regulatory schemes that provide opportunities for housing development, including units that could accommodate households with very low, low, moderate and higher incomes. State law requires that each city and county update its Housing Element on a regular cycle established in the Government Code. The Housing Element for the 2007-2014 planning period was adopted in 2010 (see Attachment 2). For the current cycle, the updated Housing Element COMMUNITY DEVELOPMENT DEPARTMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3308 • FAX (408) 777-3333 1213 Page 2 Housing Commission Housing Element Study Session August 28, 2014 must be adopted by January 31, 2015 (plus a 120-day grace period). If this adoption deadline is met, the planning period for this cycle extends from adoption to January 31, 2023 (or eight years). Otherwise, the City must update the Housing Element again in 2019 (every four years). State law also requires that the Element be reviewed by a State agency—the Department of Housing and Community Development (HCD)—to certify compliance with State law. DISCUSSION: Municipal Code Amendments Density Bonus HCD allows “streamlined review” of the Housing Element if jurisdictions meet certain criteria. Streamlined review provides priority in the HCD review process (shortening review times) and limits HCD staff review and comments to just those sections of the document where changes are proposed relative to the 2007-2014 Element. If a jurisdiction is not eligible for streamlined review, HCD’s review generally takes longer; up to the 60-day period HCD is permitted by law to review the documents, thereby potentially delaying the adoption of the Housing Element. The adoption deadline remains January 31, 2015 (plus a 120-day grace period.) The City meets all requirements to qualify for the streamlined review with the exception of the adoption of an updated Density Bonus ordinance to comply with changes to State Law. The City would have to comply with State Law with or without an updated ordinance. However, if the City adopts an updated ordinance prior to HCD submittal of the Housing Element, the City will then be eligible for streamlined review. In order to qualify for streamlined HCD review, a draft Density Bonus Ordinance has been prepared (See Attachment A to Attachment HC-1). State density bonus law is prescriptive in establishing parameters for density bonuses, both related to the scale of the bonus that must be provided and the number of incentives that the City must provide if a developer proposes to include certain types of housing and amenities within their project (including affordable housing, senior housing, land donation and child care centers). The proposed Ordinance has been drafted to replicate State Law requirements. Other Ordinance Amendments A number of ordinance amendments are necessary to update the City’s Municipal Code to comply with changes to State Housing Law and HCD guidelines. These were identified through the constraints analysis conducted in the preparation of the Housing Element update (see section “Constraints Analysis” below.) Other minor changes have also been identified in Title 19 (Zoning) of the Municipal Code related to improving readability and eliminating redundancy. Below Market Rate Ordinance In order to implement the City’s Residential Housing Mitigation Program identified in the City’s previous planning period, 2007-2014 Housing Element, staff is recommending the 1214 Page 3 Housing Commission Housing Element Study Session August 28, 2014 adoption of an implementation ordinance in Title 19 of the Municipal Code. The Below Market Rate (BMR) Housing Program ordinance identifies the purpose of adopting such an ordinance and the administration of the program. Details regarding the implementation of the program are identified in the current BMR Mitigation Manual. The City is working on a nexus study to update the BMR fee mitigation requirements and an update to the BMR mitigation manual. These items will be brought to the City Council along with the adoption of the Final Housing Element early next year. Housing Element Content The Housing Element is the City’s primary policy document regarding the development, rehabilitation, and preservation of housing for all economic segments of the population. Per State Housing Element law, the Housing Element must be periodically updated to:  Examine the local need for housing with a focus on special needs populations (Needs Assessment)  Analyze potential constraints to new housing production (Constraints Analysis)  Describe goals, policies and implementation programs to achieve local housing objectives (Housing Plan)  Outline the community’s housing production objectives consistent with State and regional growth projections per the Regional Housing Needs Allocation (RHNA) and identify adequate sites for the production of housing serving various income levels (Housing Resources)  Evaluate the Housing Element for consistency with other General Plan elements (Consistency with General Plan)  Evaluate accomplishments in implementing programs in the previously adopted 2007- 2014 Housing Element, and evaluate the effectiveness and appropriateness of continuing these programs in the 2014-2022 Housing Element (Review of Previous Housing Element) Needs Assessment This section describes the demographic, housing, and economic conditions in Cupertino; assesses the demand for housing for households at all income levels; and documents the demand for housing to serve special needs populations. The Housing Needs Assessment establishes the framework for defining the City’s housing goals and formulating policies and programs that address local housing needs. The analysis in this section has been updated with recent data; however, the conclusions from the earlier Housing Element have not changed. Analysis indicates that the demand for affordable housing among lower income, median and moderate income households, including persons with a need for special needs housing (e.g. seniors, single-parent households, persons with disabilities, etc.) continues to remain unmet in the city. Housing costs have continued to rise, especially after the housing market crisis between 2008 and 2010 concluded, making homeownership generally out of reach for most except the highest earning households. It is also equally difficult to find affordable rental 1215 Page 4 Housing Commission Housing Element Study Session August 28, 2014 housing. A summary of the Needs Assessment is included in the Housing Element. The detailed and complete Needs Assessment is provided in the Technical Appendix (Section 2). Constraints Analysis The Housing Element must analyze the potential and actual governmental constraints upon the maintenance, improvement or development of housing for all income levels. In addition, this section of the Housing Element analyzes other factors such as infrastructure availability, environmental features, economic and financing constraints, market conditions and community acceptance of different housing types and densities. The constraints analysis indicates that the City’s General Plan and Zoning Ordinance are not development constraints to new housing. However, it indicates that currently, the Heart of the City Specific Plan reduces density of sites by removing lot area devoted to commercial area and parking from the density for housing. This would reduce the realistic capacity on housing sites; thereby requiring the identification of additional sites for housing and making sites unable to meet affordability criteria set by HCD (at a minimum capacity of 20 units/acre). In order to for HCD to approve the sites selected at the realistic capacity assumed for each site, the Heart of the City Specific Plan would need to be revised so that the area devoted to commercial area would be included in housing density calculations. Projects would be reviewed for conformance with zoning requirements including setbacks, heights, etc. as well as compatibility with the neighborhood. Other minor updates need to be made to the zoning ordinance to eliminate restrictions on emergency shelters, farmworker and employee housing. These zoning ordinance updates will be forwarded to the Planning Commission and City Council for adoption with the Draft Housing Element. The constraints analysis also indicates that processing time and fees for development are comparable to surrounding communities and jurisdictions. Potential constraints include road capacity, the availability of financing for affordable housing, aging waste water infrastructure in some parts of the city and community acceptance of housing development. The Constraints Analysis is contained within the Technical Appendix of the Housing Element (Section 4). Housing Plan The Housing Plan section identifies the goals, policies, and implementation programs that will guide the City’s housing policy during the Plan period. State law requires that the Housing Plan section include implementation programs that achieve the following: 1. Make sites available to meet the Regional Housing Needs Allocation (RHNA) 2. Assist in the development of adequate affordable housing 3. Address, and where possible, remove governmental constraints to housing improvement and development 4. Conserve and improve the condition of existing affordable housing 1216 Page 5 Housing Commission Housing Element Study Session August 28, 2014 5. Promote equal housing opportunities regardless of race, religion, sex, marital status, etc. 6. Preserve affordable housing developments that may be at risk of converting to market- rate. The Housing Plan section must also identify appropriate funding sources, timeframes for completion, and responsible parties for each implementation program. As part of the 2007-2014 Housing Element process, a wide-ranging public outreach effort was undertaken, including interviews with stakeholders, public meetings, and study sessions with decision makers. These meetings contributed to the development of the goals, policies, and implementation programs that were adopted in that Housing Element (adopted in 2010). The Draft 2014-2022 Housing Element draws strongly from the 2007-2014 Housing Element. The input received after several community meetings (including stakeholder interviews in 2013, three community workshops/open houses, and four study sessions—outlined in more detail below under Public Noticing and Outreach), very closely reflects the input received during preparation of the previous Housing Element. As a result, the draft 2014-2022 Housing Plan reflects minimal changes from the 2007-2014 Housing Plan. The following changes are recommended:  Policies and programs have been reformatted to reduce redundancy and reorganized for ease in reading and implementing;  Programs have been revised to ensure that the 2014-2022 Housing Element complies with State law. Specifically, programs were revised to encourage housing opportunities for extremely low-income households (AB 2634) and persons with developmental disabilities (SB 812). Programs were also added to reflect amendments to the zoning ordinance related to density bonuses, emergency shelters, and farmworker and employee housing to comply with State law and to amend the Heart of the City Specific Plan to revise the method in which residential density is calculated in mixed-use developments.  A new goal to highlight City efforts in energy conservation regarding new and existing development has been added;  An existing general plan policy related to mixed-use development to encourage development near transportation facilities and employment centers has been added to the Housing Plan;  Amendments have been made in the following areas to comply with State Law and the outcome of recent litigation: □ Redevelopment Funding: Redevelopment Agency (RDA) housing set-aside funds, which used to be a primary local funding source for affordable housing in the past, are no longer available to assist in new affordable housing development or acquisition/rehabilitation of existing units for conversion into affordable housing. This 1217 Page 6 Housing Commission Housing Element Study Session August 28, 2014 loss is associated with the Governor’s 2011 State budget revisions and subsequent court cases, making funding sources for affordable housing significantly more constrained. □ Housing Mitigation Program: The City’s affordable housing program—the Housing Mitigation Program—has been amended to comply with recent litigation. A 2009 court- case (Palmer vs. the City of Los Angeles) has resulted in cities suspending or amending the portion of their Housing Mitigation program requiring affordable units to be included in market-rate rental developments. □ Housing Preservation Program: The existing Rental Preservation Program has been amended to provide mitigation for impacts on displaced tenants in developments with four or more units. Housing Resources & Regional Housing Needs Allocation (RHNA) One of the primary requirements of State Housing Element law pertains to the Regional Housing Needs Allocation (RHNA). The RHNA is an estimate of state-wide projected housing construction needs and is based on regional allocations provided by the Department of Housing and Community Development (HCD) to regional councils of government. Through a process coordinated by regional councils of government, each jurisdiction in California receives a determination of housing need (RHNA). The Housing Resources Section in the Housing Element and the Technical Appendix is incomplete at this time since the sites for the Sites Inventory have not been selected yet. These sections will be completed prior to the submittal of the Draft to HCD. The Association of Bay Area Governments (ABAG) conducted the process to determine RHNA allocations for the 101 cities and nine counties in the Bay Area. The City of Cupertino’s RHNA allocation is 1,064 new housing units between 2014 and 2022. The City is not obligated to construct the housing units identified by the RHNA process – HCD recognizes that the market will determine the actual development of units. Rather, the City’s responsibility is to demonstrate adequate capacity—by identifying specific sites—to satisfy the RHNA under existing land use policy and zoning. State Law allows jurisdictions to take credit for residential projects that have been approved, building permits issued during the plan period in which the review is taking place and second dwelling units (also known as accessory dwelling units) that are anticipated to be constructed during the plan period. Currently, the City has issued entitlements and/or building permits for 30 units since January 1, 2014. Additionally, it is anticipated that since 32 second units (on single-family lots) were constructed in the 2007-2014 plan period, 32 second units will be constructed in the current plan period as well. Therefore, the City can take credit for a total of 62 units (30 units approved and 32 second units anticipated). As a result, the City only has to identify sites for the construction of the balance or 1,002 units. However, HCD generally requires jurisdictions to show a surplus of sites/units in order to guarantee that the RHNA realistically can be accommodated. Per consultation with HCD and the City’s consultant, it is anticipated that HCD will require sites to 1218 Page 7 Housing Commission Housing Element Study Session August 28, 2014 accommodate units equivalent to an additional 40 percent above the City’s housing need, or approximately 1,400 units. Housing Sites The Housing Commission, Planning Commission, and City Council have conducted multiple study sessions and community workshops to review potential housing sites to meet the RHNA. On April 1, 2014, the City Council authorized staff to prepare environmental review for three alternatives (A, B and C) for a maximum of nineteen (19) sites based on the criteria outlined below. HCD Criteria for Site Selection HCD reviews each Housing Element’s sites inventory to determine if adequate sites have been identified to meet the RHNA. Preparation of a “site suitability analysis” is an important step in addressing the adequate sites requirement. This analysis must demonstrate that identified sites can accommodate the housing needs—by income level—within the current planning period of the element (2014-2022). While the site suitability review has a degree of subjectivity, HCD review primarily focuses on the following criteria in determining the likelihood that a developed site will be converted to some form of housing over the planning period: existing use on the site, realistic potential for recycling, site size and ownership patterns, and development density. 1. Existing Use on the Site. The following types of sites are not considered good candidates for private residential development:  Sites with existing multi-family housing developments consisting of 10 or more units, due to the potential loss of existing investment and revenue stream to the owner, unless the owner indicates his/her interest in redeveloping the site with additional residential uses that would result in a substantial increase in the number of units.  Sites with condominium developments, since they typically have complicated ownership patterns and a developer would have to reach sales agreements with multiple owners.  Well-established organizations and institutions because of the difficulty such organizations and institutions would face relocating to locations, unless the owner indicates his/her interest in redeveloping the site with residential uses. 2. Realistic Potential for Recycling. HCD evaluates the feasibility of redevelopment based on a variety of factors, some of which include property owner interest in redevelopment with housing, market factors related to location or site characteristics, existing uses on the site that are highly valued and anticipated to remain, the condition and age of existing development on the site, and environmental liability risks, such as toxic contamination. 3. Site Size and Ownership Patterns. Larger sites provide the opportunity to increase capacity potential and to provide flexibility with regard to design, public amenities, mix of housing types, and mixed use development. Additionally, lot consolidation potential of parcels can be a 1219 Page 8 Housing Commission Housing Element Study Session August 28, 2014 factor in determining site suitability. Lot consolidation potential can be based on ownership patterns (single, limited, or multiple owners), history of lot consolidation in the area, and specific knowledge of owner interest in lot consolidation. Where lot consolidation potential is likely, the time and cost associated with development is reduced and thus the likelihood of redevelopment is increased. Another concern would be if a City relied on very few sites for their entire housing allocation since if those sites didn’t redevelop, units would not get built. Therefore, the likelihood of sites being accepted by HCD rely not only on the numbers but also the likelihood of units getting built within the eight-year Housing Element period. 4. Development Density. HCD requires an additional component of the site suitability analysis for those sites identified to meet the lower income portion of the RHNA (this includes the very low-, low-, and moderate-income RHNA). Cupertino’s lower income RHNA requirement for the 2014-2022 Housing Element is 794 units. To identify the sites and establish the number of units that can accommodate the RHNA for lower-income households, the Housing Element must include an analysis that demonstrates that the sites identified have zoning regulations and densities in place that encourage and facilitate the development of housing for lower-income households. Alternatively, Housing Element law allows local governments to utilize “default” density standards determined by HCD. Per HCD’s determination, suburban cities in Santa Clara County require a minimum “realistic” density of 20 dwelling units per acre or greater to meet lower income/affordable requirements. With Cupertino’s last Housing Element (2007-2014), HCD accepted a realistic yield of 85% of the maximum density allowed on the site, based on city-specific historic project approval data. This means that for a one acre site, while the maximum yield at a density of 25 dwelling units per acre is 25 units, the realistic yield for Housing Element purposes is (25 * 85%) = 21 units. In anticipation that the HCD will continue to accept this realistic yield, most sites in the Housing Element are in areas that are at or above this density. Additionally, if properties need to be rezoned to accommodate the RHNA on the sites identified, the zoning is being proposed to be completed in conjunction with the adoption of the General Plan Amendment to avoid additional requirements that may be imposed by the HCD. Other Criteria for Site Selection (Sustainable Communities Strategy/One Bay Area Plan/Cupertino and General Plan) In addition to the State-wide criteria that HCD uses to determine site suitability, the Sustainable Communities Strategy/One Bay Area Plan contribute additional criteria regarding what makes a desirable housing site in the ABAG region. The One Bay Area Plan is a long-range integrated transportation and land-use/housing strategy through 2040 for the San Francisco Bay Area. The Plan was jointly approved by the Association of Bay Area Governments (ABAG) and by the Metropolitan Transportation Commission (MTC) in 2013. ABAG determined the City’s and other local jurisdiction’s RHNA based on the Plan. Pursuant to SB375, the Plan includes the region’s Sustainable Communities Strategy and the 2040 Regional Transportation Plan. The Plan focuses development in Priority Development 1220 Page 9 Housing Commission Housing Element Study Session August 28, 2014 Areas (PDA). PDAs are locally designated areas within existing communities that have been identified and approved by local cities or counties for future growth. These areas are typically accessible to public transit, jobs, recreation, shopping and other services and absorb much of the growth anticipated in the region. In Cupertino, the Priority Development Areas are located along Stevens Creek Boulevard between Highway 85 and the City of Santa Clara and along De Anza Boulevard between Stevens Creek Boulevard and Highway 280. The City’s General Plan policies are generally consistent with the strategies in the One Bay Area Plan. In addition criteria consistent with the City’s General Plan have also been identified in order to ensure functional and attractive development occurs on the sites selected. Key themes include: 1. Locate development along major transportation routes with access to transit or within ½ mile of a VTA Priority Development Area (PDA) (Land Use Policy - Focus Development in Mixed-Use Special Areas with amenities including transit lines) 2. Locate higher density housing in closer proximity to employment and activity centers (Land Use Policy - Concentrate Urban Forms in Mixed-Use Special Areas) 3. Require developments to provide transit amenities (Transportation Policy - Increased public use of transit amenities) 4. Corner lot(s) with large frontage preferred – such parcels provide the most flexibility to accommodate mixed-use developments and avoid impeding parking and connectivity between mid-block parcels (Land Use Policy - Attractive Building and Site Design) 5. Incentive for redevelopment –Sites with older, under-performing retail shopping centers have also been evaluated as to whether housing would be necessary to provide an incentive to bring in a mixed-use housing/retail project that can improve the quality and performance of existing retail, while also achieving the RHNA requirements. In addition, for sites have also been evaluated to see if office development can provide the necessary incentive to redevelop and provide higher-quality retail and justify the investment in demolition and infrastructure improvements. (Land Use Policy – Incentives for Reinvestment) Prioritized List While all 19 sites have been studied for potential impacts in the Draft Environmental Impact Report (EIR), since the largest property owner associated with Site 17 sent the City a letter expressing their desire to not be included in the Housing Sites Inventory (see Attachment 3), this site is not being proposed to be included in the Housing Sites Inventory. The potential list of sites for the Housing Commission to select sites from is eighteen (18). The sites have been prioritized by how well they meet the criteria outlined above. It is assumed that if a site selected meets the criteria above, but comprises of multiple parcels and has fractured ownership, the site will be Master Planned and is expected to have a cohesive development plan. Therefore, sites that need site assembly but have a higher chance of redevelopment due to expressed owner interest within the RHNA planning period and meet the HCD and Other criteria outlined above have been ranked higher than sites that may not need site assembly but do not have expressed owner interest to develop and/or do not meet the 1221 Page 10 Housing Commission Housing Element Study Session August 28, 2014 HCD and Other criteria. As noted earlier, the recommendation is to select sites that can support a total of 1,400 units towards the RHNA allocation. The Commission’s recommendations on the Housing Sites Inventory will be forwarded to the Planning Commission for recommendation to the City Council. Consistency with General Plan The various General Plan components have been reviewed to evaluate consistency of the policies and programs outlined in the Housing Element. The analysis finds these are consistent with the General Plan policies in other elements (chapters) of the General Plan. The Consistency with the General Plan Section is contained within the Technical Appendix of the Housing Element (Section 6). Review of Previous (2007-2014) Housing Element Per State law and HCD guidelines, the review of the previous Housing Element requires analysis in three areas: (1) effectiveness of the element; (2) progress in implementation; and (3) the appropriateness of continuing the goals, objectives, policies and programs The Review of Previous Housing Element is contained within the Technical Appendix of the Housing Element (Section 7.2). This section of the Housing Element provides an evaluation of the City’s progress towards achieving housing goals and objectives as set forth in the prior Housing Element, and analyzes the efficacy and appropriateness of the City’s housing policies and programs. This review formed a key basis for restructuring the 2007-2014 Housing Plan for this 2014-2022 planning period to meet the housing needs of the community. General Plan Amendment and Housing Element Environmental Review As discussed previously, in addition to the preparation of an updated Housing Element, a General Plan Amendment (GPA) is also being prepared for City Council consideration. The primary purpose of the GPA is to replenish, re-allocate, and potentially increase citywide development allocations in order to plan for anticipated future development activity, with the clear goal while maintaining the community’s character, goals, and objectives. The secondary purpose of the GPA is to consider, under a comprehensive community vision, consolidated development requests from several property owners for General Plan amendments. Pursuant to the California Environmental Quality Act (CEQA), both the Housing Element and the GPA (and other implementing ordinances such as the Density Bonus Ordinance) are considered projects that must be reviewed for potential environmental impacts. The environmental review for the General Plan Amendment and Housing Element projects is being completed concurrently. The Draft Environmental Impact Report (EIR) was made available for public review and comment for a 45-day period ending on August 1, 2014. As required by CEQA, a Response to Comments document (RTC), to respond to comments received regarding the adequacy of the Draft EIR is being prepared, which will include corrections necessary to the Draft EIR. The RTC document and the Draft EIR together comprise the Final EIR. The City 1222 Page 11 Housing Commission Housing Element Study Session August 28, 2014 Council must certify the Final EIR prior to making any decisions on the General Plan, Housing Element or any ordinance amendments associated with the two projects. The Housing Commission need not act on the EIR in order to make its recommendation. Public Comments Several comments were received during the public comment period for the Draft EIR. Some of the comments received during this time did not pertain to the adequacy of the Draft EIR. These comments included concerns by members of the public about sites that were studied in the EIR for potential inclusion in the Housing Sites Inventory of the Housing Element. These comments have been included in Attachment HC-6. PUBLIC NOTICING & OUTREACH The following outreach efforts have been undertaken on this project to date. Postcards A postcard was delivered in February 2014 to all postal addresses in the City to announce upcoming dates on the General Plan and Housing Element projects. A second postcard was delivered in June 2014 to all postal addresses in the City to announce the availability of the Draft EIR and invite attendance at a Draft EIR comment meeting. The postcards also provided a description of the projects (the General Plan Amendment and Housing Element update) and identified the project website where interested persons may sign up for project updates, further notices, and submit comments on the Draft EIR. Website A website has been set up for the combined General Plan and Housing Element projects at www.cupertinogpa.org. All technical reports, notices and other important information are available at the website. The website also has a separate tab for the Housing Element project which provides answers to Frequently Asked Questions. Interested persons may also submit comments at the website. Meetings Stakeholder Interviews Stakeholder interviews were conducted on December 11 & 12, 2013 to solicit input from stakeholders ranging from community members, property owners, housing developers, service providers, school districts, and the business community. Joint PC/HC Workshop – January 23, 2014 On January 23, 2014, the Planning Commission and Housing Commission hosted a joint workshop to begin the Housing Element Sites discussion. Eleven participants broke into small groups and identified potential future sites for housing and criteria for increased density in 1223 Page 12 Housing Commission Housing Element Study Session August 28, 2014 certain areas including community benefits. Participants drew on maps and placed stickers on to identify potential housing sites. Housing Commission Workshop – February 12, 2014 On February 12, 2014, the Housing Commission hosted a workshop to discuss and prioritize sites for inclusion in the Housing Element. Following a project update presentation, participants broke into groups and discussed identification of new sites and prioritizing potential housing sites to meet the RHNA. The Housing Commission recommended forwarding all the sites highlighted by workshop participants as priority sites to the Planning Commission for consideration. Planning Commission Open House and Study Session - February 19, 2014 On February 19, 2014, the Planning Commission hosted an open house and study session to provide a public forum to continue the Housing Element Sites discussion and prioritize sites for inclusion in the Housing Element. The Planning Commission recommended criteria to focus the sites selection. Specifically, the Commission recommended removing certain sites that were viewed as not viable (successful shopping centers, sites with existing established institutional uses, and small sites with low yield or no property owner interest). In addition, the Planning Commission recommended including sites that would further the following three goals: 1) distribute housing throughout the city, 2) encourage development along the Priority Development Area designated by the One Bay Area Plan, and 3) minimize impacts to schools. City Council Study Session - March 4, 2014 On March 4, 2014, the City Council held a study session to discuss in depth the potential housing sites that would be analyzed in the Environmental Impact Report. A list of “High” and “Moderate” priority sites was proposed based on previous public and Commission input. The Council recommended including two sites, included in the previously adopted Housing Element, and provided direction to study in the EIR all sites presented as “High” and “Moderate.” The Council was also advised at this meeting that impact to schools may not be a goal of the site selection exercise since SB 50 preempts this issue with the adoption of School Impact Mitigation fees, which fully mitigate any school impacts from development of property. Environmental Scoping Meeting - March 11, 2014 The City held an Environmental Scoping Meeting on March 11, 2014 at the Cupertino Community Hall (10350 Torre Avenue, next to the library). The meeting provided an overview of the proposed project and an opportunity for public comment on the scope and EIR content. Housing Commission Study Session - March 19, 2014 On March 19, 2014, the Housing Commission held a study session to review the City’s accomplishments in implementing the 2007-2014 Housing Element and to discuss draft goals, policies, and implementation programs associated with the 2014-2022 Housing Element. 1224 Page 13 Housing Commission Housing Element Study Session August 28, 2014 Joint Planning Commission and City Council Study Session - April 1, 2014 The City Council and Planning Commission held a joint study session on April 1, 2014, to discuss draft General Plan Amendment and Housing Element policies, and hear public comments and questions. At the conclusion of the meeting, City Council confirmed the Housing Element sites and goals, policies, and implementation programs to be studied in the EIR. Environmental Impact Report (EIR) Comment Meeting - June 24, 2014 The City held a public meeting on June 24, 2014, at Cupertino Community Hall to present the recently published Draft EIR. The Draft EIR analyzes the potential environmental impacts related to the draft General Plan Amendment and Housing Element Update. This meeting provided an opportunity for the community to learn about the Draft EIR and submit comments. Housing Commission - August 28, 2014 The following table summarizes the noticing for this meeting: Notice Agenda  Email sent to all interested parties signed up through the project website (at least 10 days prior to hearing)  Legal Ad (at least 10 days prior to hearing)  Newspaper Ad (5 days prior to hearing)  Posted on the City's official notice bulletin board (one week prior to the hearing)  Posted on the City of Cupertino’s website (one week prior to the hearing)  Posted on the project website (one week prior to hearing) CONCLUSION AND NEXT STEPS The Housing Commission’s recommendation on the Draft Density Bonus Ordinance and the Housing Element will be forwarded to the Planning Commission for its review in October 2014. After which, the Planning Commission’s recommendation on the Draft Ordinances, Draft 2014- 2022 Housing Element and the Draft General Plan will be forwarded to the City Council for its review and decision in November 2014,. The Housing Element will then be transmitted to HCD for review. It is anticipated that HCD review will be completed by January 2015. The final Housing Element, which will reflect any changes required by HCD, will be presented to the Housing Commission, Planning Commission and the City Council for final adoption in March /April 2015, which will comply with the May 2015 deadline for the adoption of the Housing Element per State Law. At that time, in addition to the final Housing Element, staff will present an updated Residential Mitigation linkage fee and Below-Market-Rate Mitigation Manual which will reflect changes required due to amendments to the Housing Element. Prepared by: Piu Ghosh, AICP, Senior Planner Christopher “C.J.” Valenzuela, Senior Housing Planner 1225 Page 14 Housing Commission Housing Element Study Session August 28, 2014 Reviewed by: Approved by: /s/ Gary Chao /s/ Aarti Shrivastava Gary Chao Aarti Shrivastava Assistant Director of Community Development Assistant City Manager Attachments: 1. Housing Commission Resolution re: A. Ordinance Amendments; B. Housing Element (Chapter 3 of General Plan) & Housing Element Technical Report Update 2014 – 2022 (Appendix B); and C. Criteria and Prioritized list of Housing Sites 2. 2007 – 2014 Housing Element, adopted 2010 3. Letter/Email from Valley Church dated March 6, 2014 4. Comment letters that pertain to Housing Element content: A. Ruby Elbogen - dated June 18, 2014 B. Catherine Alexander – dated June 24, 2014 C. Concerned Citizens of Cupertino - dated June 25, 2014 D. Gary Jones – dated July 4, 2014 E. Phyllis Dickstein - dated July 10, 2014 F. Patricia McAfee – dated July 10, 2014 G. Josh Tsai – dated July 28, 2014 H. Concerned Citizens of Cupertino - dated July 31, 2014 I. Apple - dated July 31, 2014 J. Youichi Y. – dated July 31, 2014 K. Huanying Cheng and Qing Li - dated August 1, 2014 1226 Attachment S – 2007-2014 Housing Element and Technical Appendix Please view this information on the City’s website at: http://www.cupertino.org/gp Section #3 and Appendix #B 1227 Potential Housing Element Sites ATTACHMENT T Site No.Name/Type Address Size Proposed Land Use Designation Proposed Zoning Ex i s t i n g U s e Re a l i s t i c P o t e n t i a l f o r Re c y c l i n g Si t e S i z e Si n g l e O w n e r s h i p De v e l o p m e n t D e n s i t y Pr o x i m i t y t o E m p l o y m e n t / Ac t i v i t y C e n t e r s Ne a r A m e n i t i e s Co r n er L o t / P u b l i c I n t e r f a c e Lo c a t e d w i t h i n V T A P r i o r i t y De v e l o p m e n t A r e a ( P D A ) Ne e d s H o u s i n g f o r Re d e v e l o p m e n t Po t e n t i a l T o M e e t H C D & Ot h e r C r i t e r i a Al t e r n a t e A (M i n i m a l G r o w t h ) Ba l a n c e d P l a n Re c c o m m e n d a t i o n Al t e r n a t e B (M o d e r a t e G r o w t h ) Al t e r n a t e C (H i g h e s t G r o w t h ) Recommended Housing Element Sites - 235 235 235 25 du/ac 35 du/ac 35 du/ac 35 du/ac - 600 600 800 35 du/ac 35 du/ac 35 du/ac 35 du/ac - 344 344 820 25 du/ac 65 du/ac 65 du/ac 110 du/ac 103 103 103 103 25 du/ac 25 du/ac 25 du/ac 25 du/ac 11 11 11 11 25 du/ac 25 du/ac 25 du/ac 25 du/ac 93 93 93 93 20 du/ac 20 du/ac 20 du/ac 20 du/ac Total Units on Recommended Housing Element Sites 207 1,386 1,386 2,062 High HighX√√√√R3 (NO CHANGE)X X6Glenbrook Apt./ Existing HE (517 units existing)** 10160 & 21297 Parkwood 31.34 Med Density Residential (10-20) 5 Barry Swenson Site/ Existing HE 19160 Stevens Creek Blvd 0.55 Commercial/ Office/ Residential Other CriteriaHCD Criteria Realistic Capacity @ 85% of max. density (du/ac & net units) P(CG, Res)√√√√√√√√√XCommercial/ Office/ Residential P(CG, Res) no change √√X √√√√X √√ High * High X *√√√ High √ √√√ 1 √√ √√√ √√√√X √ 2 Vallco Shopping District / Property Owner Interest 10123 N Wolfe Rd 33.71 Commercial/ Office/ Residential P(Regional Shopping, OP, Res) √√√ Oaks Shopping Center/ Workshop Proposed 21255 Stevens Creek Blvd 7.9 4 United Furniture, East of E. Estates (includes portion of street)/Existing HE and Lot Consolidation 10025, 10075 E. Estates, 19541 Richwood Dr., 19550 Stevens Creek Blvd, 10055 Miller Ave 4.43 Commercial/ Office/ Residential (NO CHANGE) P(CG, Res) (no change) 3 The Hamptons/ Property Owner Interest (342 units existing) 19500 Pruneridge Ave 12.44 High Density Residential (> 35) P(Res) High* √√ √√X *√√√√√√ 1228 Potential Housing Element Sites Page 2 of 3 HE Site EvaluationTable for CC.xlsx 2 11/3/2014 Site No.Name/Type Address Size Proposed Land Use Designation Proposed Zoning Ex i s t i n g U s e Re a l i s t i c P o t e n t i a l f o r Re c y c l i n g Si t e S i z e Si n g le O w n e r s h i p De v e l o p m e n t D e n s i t y Pr o x i m i t y t o E m p l o y m e n t / Ac t i v i t y C e n t e r s Ne a r A m e n i t i e s Co rn er L o t / P u b l i c I n t e r f a c e Lo c a t e d w i t h i n V T A P r i o r i t y De v e l o p m e n t A r e a ( P D A ) Ne e d s H o u s i n g f o r Re d e v e l o p m e n t Po t e n t i a l T o M e e t H C D & Ot h e r C r i t e r i a Al t e r n a t e A (M i n i m a l G r o w t h ) Ba l a n c e d P l a n Re c c o m m e n d a t i o n Al t e r n a t e B (M o d e r a t e G r o w t h ) Al t e r n a t e C (H i g h e s t G r o w t h ) Other CriteriaHCD Criteria Realistic Capacity @ 85% of max. density (du/ac & net units) Alternate Housing Element Sites 145 204 204 232 25 du/ac 35 du/ac 35 du/ac 40 du/ac 134 187 187 214 25 du/ac 35 du/ac 35 du/ac 40 du/ac - - - - 25 du/ac 25 du/ac 25 du/ac 25 du/ac 27 27 27 27 25 du/ac 25 du/ac 25 du/ac 25 du/ac - 151 151 151 35 du/ac 35 du/ac 35 du/ac 35 du/ac 96 96 96 154 25 du/ac 25 du/ac 25 du/ac 40 du/ac 33 33 33 33 25 du/ac 25 du/ac 25 du/ac 25 du/ac Total Units on Alternate Housing Element Sites 435 698 698 811 √*√X X Low- Moderate* √X X Low- Moderate* 11 Summerwinds/Granite Rock/Jack in the Box/ Property Owner Interest 1451, 1471, 1491 & 1505 S De Anza Blvd 4.57 Commercial/ Office/ Residential P(CG, Res)√√√X *√X √√√√√√X Low- Moderate 10 Homestead Lanes + Adjacency/ Workshop Proposed 20916, 20956, 20990 Homestead Rd 5.1 Commercial/ Residential (no change) P(CG, Res) no change X √√X *√√√ 9 Loree Center/ Existing HE 10029 Judy Ave, 19060 Stevens Creek Blvd 1.29 Commercial/ Office/ Residential (NO CHANGE) P(CG, Res) no change X X X Moderate* 12 Shan Restaurant, Q-Mart/ Existing HE and Lot Consolidation 20007, 20021 Stevens Creek Blvd & 10041 N. Blaney Ave 1.58 Commercial/ Office/ Residential (no change) P(CG, Res) no change √X X X *√√√√√X Low- Moderate* √√√√√XP(CG, Res) no change X √√√ 9 Cypress Building/Hall Property/ Workshop Property 19200, 19220 & 19280 Stevens Creek Blvd (Opposite Main Street) 4.98 Commercial/ Office/ Residential (no change) X X √X * √X Moderate* 8 Stevens Creek Office Center/ Property Owner Interest 20823 Stevens Creek Blvd 6.31 Commercial/ Residential (no change) P(CG, Res) no change X √√X √X Moderate 7 Marina Plaza/ Property Owner Interest 10118 Bandley Drive 6.86 Commercial/ Office/ Residential (NO CHANGE) P(CG, Res) no change X √√X*√√√X 1229 Potential Housing Element Sites Page 3 of 3 HE Site EvaluationTable for CC.xlsx 3 11/3/2014 Site No.Name/Type Address Size Proposed Land Use Designation Proposed Zoning Ex i s t i n g U s e Re a l i s t i c P o t e n t i a l f o r Re c y c l i n g Si t e S i z e Si n g le O w n e r s h i p De v e l o p m e n t D e n s i t y Pr o x i m i t y t o E m p l o y m e n t / Ac t i v i t y C e n t e r s Ne a r A m e n i t i e s Co rn er L o t / P u b l i c I n t e r f a c e Lo c a t e d w i t h i n V T A P r i o r i t y De v e l o p m e n t A r e a ( P D A ) Ne e d s H o u s i n g f o r Re d e v e l o p m e n t Po t e n t i a l T o M e e t H C D & Ot h e r C r i t e r i a Al t e r n a t e A (M i n i m a l G r o w t h ) Ba l a n c e d P l a n Re c c o m m e n d a t i o n Al t e r n a t e B (M o d e r a t e G r o w t h ) Al t e r n a t e C (H i g h e s t G r o w t h ) Other CriteriaHCD Criteria Realistic Capacity @ 85% of max. density (du/ac & net units) Sites Recommended for Removal 62 62 62 62 20 du/ac 20 du/ac 20 du/ac 20 du/ac - - - - 25 du/ac 25 du/ac 25 du/ac 25 du/ac - 27 - 27 15 du/ac 25 du/ac 15 du/ac 25 du/ac - 14 - 19 15 du/ac 25 du/ac 15 du/ac 35 du/ac 169 169 169 169 25 du/ac 25 du/ac 25 du/ac 25 du/ac 17 IntraHealth/ Office/ Tennis Courts/ Workshop Proposed 21020, 21040, 21060, 21070 Homestead Rd & APN: 326 07 022, 326 07 036 (Homestead/ Stelling) 5.42 Commercial/ Residential P(CG)√√√X *√√√√X X Low - 161 161 Total Units on Removed Sites 231 272 231 277 Total Units for All Sites 873 2,356 2,315 3,150 Notes: * **Indicates that site will not meet affordability criteria at Realistic capacity (85% of max.) ` Low√√X X X P(CG, ML, Res) (NO CHANGE) X X √√16 Carl Berg property/ Existing HE 20705 Valley Green Dr.7.98 Office/ Industrial/ Commercial/ Residential (NO CHANGE) X √X √ X Low √X √Low 15 Bateh Brothers/ Property Owner Interest 22690 Stevens Creek Blvd 0.67 Commercial/ Residential P(CG, Res) (NO CHANGE) √√X √X X √X Low* 14 Foothill @ McClellan Center (Foothill Market)/ Property Owner Interest 10625 S Foothill Blvd 1.3 Commercial/ Residential P(CG, Res) (no change)√√X √X X X √Low 13 Arya/ Scandinavian Design/ Existing HE 19930. 19936 & 19900 Stevens Creek Blvd 2.88 Commercial/ Office/ Residential (NO CHANGE) P(CG, Res) (no change)X X √X *√√√X X √X √XR3 (no change)X X √√12 The Villages Apt./ Existing HE (468 units existing)** 20800, 20975, 20990, 20800, 20875 Valley Green Dr. 27.1 Med Density Residential (10-20) Separate parcels on a Housing Element site shall be combined, master planned and developed under a Master Developer. 1230 -1- SUMMARY OF LAND USE MAP, ZONING MAP AND MUNICIPAL CODE TEXT AMENDMENTS Map Amendments • General Plan Land Use designation revisions: o An overlay for the development standards for the Housing Element sites that will go into effect on April 30, 2015 (including the 30-day appeal period, this represents the final date for adoption of a Housing Element per HCD) or Final Adoption of the Housing Element, whichever occurs first. The designation is not proposed to be amended if the sites to be rezoned are not selected as Housing Element sites; o Revision to the PG&E site from Quasi-Public/Institutional to Commercial/Quasi- Public/Institutional; o Revision to the Mirapath site from Industrial/Residential to Commercial/Industrial/Residential; and o Revision to City-owned parkland from various residential designations to Parks and Open Space. o Other sites – to bring existing uses, zoning and General Plan Land use in compliance (mostly located in the Monta Vista Village Planning Area). • Zoning Map Amendments (to be consistent with the proposed General Plan land use designation): o Housing Element sites - goes into effect on April 30, 2015 (including the 30-day period, this represents the final date for adoption of a Housing Element per HCD) or date of adoption of the Final Housing Element, whichever occurs first. o Rezoning of the PG&E from Quasi-public (BQ) to General Commercial/Quasi-Public (CG/BQ) zoning to be consistent with the proposed General Plan land use designation. o Rezoning of the Mirapath site from Light Industrial (ML-fa) to Commercial/Light Industrial (CG/ML) o Rezoning of property being transferred to the Irvine Company by Apple as a result of a land swap agreement, in exchange for property along Wolfe Road to facilitate street improvements. It is recommended that this be rezoned P(Res). o City-owned parkland – rezoning from various zoning designations (such as R1-10, R3, R1C and A) to Park and Recreation (PR) zoning to be consistent with the recommended General Plan designations. o Consistency with General Plan land use designation – bringing areas into compliance with the existing General Plan land use designations. Municipal Code Text Amendments 1. Requests – Definition of gross lot area eliminated as redundant, since lot area will be used to calculate maximum residential yield. 1231 -2- 2. Cleanup - • Parkland dedication was moved from Title 18: Subdivision of the Municipal Code (Chapter 18.24) into Title 13: Parks, as a separate chapter (Chapter 13.08). • Conforming Heart of the City Specific Plan with Special Area boundaries in the General Plan. Vallco Shopping District will be a Special Area in the Land Use and Community Design element with its own Specific Plan as discussed earlier. • Clarifications and removal of redundancies. 3. Housing Element - A number of ordinance amendments are necessary to update the City’s Municipal Code to comply with changes to State Housing Law and HCD guidelines. These were identified through the constraints analysis conducted in the preparation of the Housing Element update. A brief list is provided below. The “Constraints Analysis” section in the Draft Housing Element provides a detailed discussion of these issues. • Density Bonus Ordinance • Below-Market Rate (BMR) Ordinance • Heart of the City Specific Plan • Farm worker housing • Permanent Emergency shelters 1232 CHAPTER 13.08 PARK LAND DEDICATION/FEE Section 13.08.010 Purpose. 13.08.020 Definitions 13.08.030 Applicability. . 13.08.050 Parkland Dedication. Density (DU/acre) Average number of persons/DU Average Parkland Dedication/DU (in acres) 0—5 3.5 .0105 5—10 2.0 .0060 10—20 2.0 .0060 20 + 1.8 .0054 10 + 1.8 .0054 Senior Citizen Housing Development 1.0 .0030 13.08.060 Fees in Lieu of Parkland Dedication. 13.08.070 Combination of Parkland Dedication and Fee. 13.08.080 Credit for Private Recreation or Open Space. 18.24.090 Credit for Existing Dwelling Units. 13.08.100 General Procedures. Error! Reference source not found. 13.08.010 Purpose. The purpose of this Chapter is to regulate , in the public interest, convenience, health, welfare and safety, the provision of park and recreational facilities upon development for which dedication of land and/or payment of a fee is required in accordance with the open space and conservation element of the adopted General Plan of the City of Cupertino, and any amendments. 13.08.020 Definitions “Dwelling unit” or “unit” means a room or group of rooms including living, sleeping, eating, cooking and sanitation facilities, constituting a separate and independent housekeeping unit, occupied or intended for occupancy on a non-transient basis and having not more than one kitchen. 13.08.030 Applicability. A. Upon development of a new dwelling unit, at the option of the City, a parkland dedication, or a payment of a fee in lieu thereof, or both, shall be required. MOVED FROM CHAPTER 18.24 1233 - 2 - 13.08.050 Parkland Dedication. A. Where the City determines that a park or recreational facility is to be located in whole or in part within the proposed development, land sufficient in topography and size shall be dedicated per the formula below. Parkland dedication/DU =  (Average number of persons/DU) x (Park Acreage Standard) 1000 persons B. The Park Acreage Standard is three acres of property for each one thousand persons. C. Parkland dedication based on development density: Table 13.08.050 indicates the average parkland dedication required per dwelling unit based on development density per the formula above (13.08.050.A). Table 13.08.050: Park Land Dedication Formula Table Density (DU/acre) Average number of persons/DU Average Parkland Dedication/DU (in acres) 0—5 3.5 .0105 5—10 2.0 .0060 10—20 2.0 .0060 20 + 1.8 .0054 10 + 1.8 .0054 Senior Citizen Housing Development 1.0 .0030 13.08.060 Fees in Lieu of Parkland Dedication. A. General Standard. 1. If the City determines that a parkland dedication is not required, a fee shall be paid in lieu thereof. 2. Fees in Lieu of Land–Fifty units or Less. If a proposed development contains fifty units or less, a fee in lieu of parkland dedication shall be paid, unless dedication is deemed appropriate and in the public interest by the City. B. Amount. The amount of the fee shall be equal to the fair market value of the land prescribed for dedication pursuant to Section 13.08.050. The fee shall be calculated as follows: In lieu fee = ((Average Parkland Dedication/DU)*(Net new dwelling units)*(Fair Market Value of land/acre)) C. Fair Market Value of land per acre. The Department of Public Works shall establish the fair market value of land within the City and update the value on an annual basis in the City’s Fee Schedule. The fair market value shall be determined by reference to comparable land within the City. As used herein, the term “comparable” means land of similar size and development potential as the land which would otherwise be dedicated. MOVED FROM CHAPTER 18.24 1234 - 3 - D. Use of Money. The money collected shall be paid to the Treasurer of the City or his or her authorized agent. Such money shall be placed in a special revenue fund which shall be known as the “park dedication in-lieu fee fund” and shall be used for all purposes allowed by State Law. 13.08.070 Combination of Parkland Dedication and Fee. A. The City shall determine whether it accepts parkland dedication, elects to require payment of a fee in lieu, or a combination of both a parkland dedication and a fee in lieu, upon consideration of the following: 1. Topography, geology, access and location of land in the development available for dedication; 2. Size and shape of the development and land available for dedication; 3. Feasibility of dedication; 4. Availability of previously acquired park property. B. The determination of the City as to whether land shall be dedicated, or whether a fee shall be charged, or a combination thereof, shall be final and conclusive. 13.08.080 Credit for Private Recreation or Open Space. A. Where private open space for park and recreational purposes is provided in a proposed development, fifty percent credit shall be given against the requirement of land dedication or payment of fees in lieu thereof, if the approval authority finds that it is in the public interest to do so and that all the standards in Section 13.08.080 B, below are met and findings in Section 13.08.080C can be made. B. That the open space for which credit is given complies with the following standards: 1. The total usable open space acreage for the development must be equivalent to the parkland dedication calculated pursuant to Section 13.08.050. 2. The open space must contain the mandatory elements and at least four of the six optional elements indicated in Table 13.08.080 below and meet the following criteria: a. The combined minimum acreage for a facility with a recreation center and children’s play apparatus area is 1.3 acres. b. The minimum combined acreage for a facility not including a recreation center or children’s play area is 1.5 acres. Table 13.08.080 – Mandatory and Optional Elements for private open space Minimum Acreage Mandatory Element Turfed playfield The playfield shall be a single unit of land which is generally level and free of physical barriers which would inhibit group play activities. .50 MOVED FROM CHAPTER 18.24 1235 - 4 - Optional Elements Children’s play apparatus area .15 Recreational community gardens .25 Family picnic area .25 Game court area .25 Swim pool (42’ x 75’ with adjacent deck and lawn areas) .25 Recreation center buildings and grounds .15 C. The approval authority may grant park credit for a combination of the above elements or a combination of the above elements and other recreation improvements that will meet the specific recreation needs of a specialized housing development, such as a senior housing development, with occupancy controlled via a covenant with the City named as a third party beneficiary. D. Findings. The approval authority shall adopt the following written findings and shall require the recordation of covenants running with the land to ensure that credited elements are maintained, before credit is given: 1. That yards, court areas, setbacks, decorative landscape areas normally associated with residential site design and other areas required to remain free and clear by zoning and building ordinances and regulations shall not be included in the computation of such private open space; 2. That such space is to be wholly or partially owned and maintained by the future residents of the development and that the private ownership and maintenance of the open space is adequately provided for by recorded written agreement, conveyance or restrictions; 3. That the use of the private open space is restricted for park and recreational purposes by recorded covenant, which runs with the land in favor of the future owners of property and which cannot be eliminated without the consent of the City or its successor; 4. That the proposed private open space is reasonably adaptable for use for park and recreational purposes, taking into consideration such factors as size, shape, topography, geology, access and location; 5. That the facilities proposed for private recreation or open space are in substantial conformance with General Plan policies. 18.24.090 Credit for Existing Dwelling Units. When dwelling units exist on the property where development is proposed, a credit shall be given against the requirement of land dedication or payment of fees in lieu thereof for the number of units existing. As used herein, the term “existing” refers to units which exist at the time of approval of the dwelling units or which were demolished within one year prior to the submittal of an application for development of the dwelling units. MOVED FROM CHAPTER 18.24 1236 - 5 - 13.08.100 General Procedures. A. At the time of approval of the dwelling units, the approval authority shall determine whether a parkland dedication or a fee in lieu thereof is required unless a parkland dedication or fee has already been provided. B. At the time of building permit application, land shall be dedicated to the City or the fee in lieu thereof shall be paid. C. Open space covenants for private park or recreational facilities shall be submitted to the City prior to approval of the building permits and shall be recorded simultaneously with the issuance of final occupancy. D. If parkland dedication is required, the design of the park shall be reviewed and approved and construction shall be completed prior to occupancy of the development. 1237 - 6 - CHAPTER 18.24: DEDICATIONS AND RESERVATIONS Section Article I. Dedication of Streets, Alleys, Rights-of-Way and Easements. 18.24.010 Dedication of Streets, Alleys, and Other Public Rights-of-way or Easements. Article II. Park Land Dedication. 18.24.020 Purpose. 18.24.030 Requirements. 18.24.040 General Standard. 18.24.050 Standards and Formula for Dedication of Land. 18.24.060 Formula for Fees in Lieu of Park Land Dedication. 18.24.070 Criteria for Requiring Both Dedication and Fee. 18.24.080 070 Amount of Fee in Lieu of Park Land Dedication. 18.24.090 080 Subdividers Not Within General Plan. 18.24.100 090 Determination of Land or Fee. 18.24.110 100 Credit for Private Recreation or Open Space. 18.24.115 110 Credit for Existing Residential Units. 18.24.120 Procedure. 18.24.130 Commencement of Development. Article III. School Site Dedication. 18.24.140 General. 18.24.150 Procedure. 18.24.160 Payments to Subdivider for School Site Dedication. 18.24.170 Exemptions. Article IV. Reservations. 18.24.180 General. 18.24.190 Standards for Reservation of Land. 18.24.200 Procedure. 18.24.210 Payment to Subdivider. 18.24.220 Termination. Article V. Waiver of Direct Street Access. 18.24.230 Waiver of Direct Street Access. 1238 - 7 - Article I. Dedication of Streets, Alleys, Rights-of-Way and Easements. 18.24.010 Dedication of Streets, Alleys, and Other Public Rights-of-way or Easements. A. As a condition of approval of a final map or parcel map, the subdivider shall dedicate or make an irrevocable offer of dedication of all parcels of land within the subdivision that are needed for streets and alleys, including access rights and abutters’ rights; drainage; public utility easements; bicycle paths, transit facilities, solar access easements, park land, fire stations, libraries, access to public resources and other public easements as required. B. Improvements shall be in accordance with Chapter 18.32, Subdivision Improvements, of this title. Article II. Park Land Dedication. 18.24.020 Purpose. This section is enacted pursuant to the authority granted by the Government Code. The park and recreational facilities for which dedication of land and/or payment of a fee is required by this chapter are in accordance with the open space and conservation element of the adopted General Plan of the City of Cupertino, and any amendments. 18.24.030 Requirements. A. As a condition of approval of a final subdivision map or parcel map, the subdivider shall dedicate land, pay a fee in lieu thereof, or both, at the option of the City, for park or recreational purposes at the time and according to the standards and formula contained in this chapter. B. The provisions of this chapter are not applicable to the following land use categories: 1. Commercial or industrial subdivisions; 2. Condominium conversion projects or stock cooperatives which consist of the subdivision of air space in an existing apartment building which is more than five years old when no new dwelling units are added; 3. Convalescent hospitals and similar dependent care facilities. 18.24.040 General Standard. The Parkland Dedication standard shall be as identified in the City’s General Plan and Chapter 13.08public interest, convenience, health, welfare and safety require that three acres of property for each one thousand persons be devoted for neighborhood park and recreational purposes. 18.24.050 Standards and Formula for Dedication of Land. A. Where a park or recreational facility has been designated in the open space and conservation element of the General Plan of the City, and is to be located in whole or in part within the proposed subdivision to serve the immediate and future need of the residents of the subdivision, the subdivider shall dedicate land for a local park sufficient in size and topography to serve the residents of the subdivision. MOVED TO CHAPTER 13.08 1239 - 8 - The subdivider shall provide park lands as related to the need for a neighborhood park and therefore, the formula for dedication of park land for residential development should be based upon three acres of park land per one thousand persons. B. The formula for determining acreage to be dedicated shall be pursuant to Section 13.08.050.as follows: Average number of Persons/Unit Park Acreage Standard 1000 Population Example for single-family DU:   3.5 x 3 1000 = 0.0105 ac/U B. Table 18.24.050, of population density, is to be followed. In the event apartment-zoned land is subdivided, the park land dedication formula shall be applied as related to the maximum number of units permitted by the zoning classification of the property. 18.24.060 Formula for Fees in Lieu of Land Dedication. A. General Formula. If there is no park or recreation facility designated in the open space and conservation element of the General Plan to be located in whole or in part within the proposed subdivision to serve the immediate and future needs of the residents of the subdivision, the subdivider shall, in lieu of dedicating land, pay a fee pursuant to the formula in Section 13.08.060. equal to the market value of the land prescribed for dedication in Section 18.24.080, Amount of Fee in Lieu of Park Land Dedication, this fee to be TABLE 18.24.050 Park Land Dedication Formula Table Types of Dwellings Density DU/acre Average Household Size/DU Average Acreage Requirement/DU, Based on 3-acre Standard Single-Family 0--5 3.5 .0105 Duplex, medium low 5--10 2.0 .0060 Cluster, medium 10--20 2.0 .0060 Cluster, medium high 20 + 1.8 .0054 Apartments 10 + 1.8 .0054 Elderly housing* All ranges 1.0 .0030 * A project which is occupied by an elderly household as defined in Section 50067 of the Health and Safety Code. MOVED TO CHAPTER 13.08 1240 - 9 - determined to be used for a local park which will serve the residents of the area to be subdivided. A. Valuation of the land described above shall be determined, for in lieu fee purposes, under the procedures described in Section 18.24.080, Amount of Fee in Lieu of Park Land Dedication. B. Fees in Lieu of Land–Fifty Parcels or Less. If the proposed subdivision contains fifty parcels or less, the subdivider shall pay a fee in lieu of dedication, unless dedication is deemed appropriate and in the public interest by the City. equal to the land value of the portion of the local park required to serve the needs of the residents of the proposed subdivision as prescribed in Section 18.24.050 and in an amount determined in accordance with the provisions of Section 18.24.080, Amount of Fee in Lieu of Park Land Dedication. C. Fair Market Value of land per acre. The Fair Market Value of land per acre shall be established pursuant to Section 13.08.050C. D. Use of Money. The money collected shall be paid and used pursuant to Section 13.08.060D. paid to the treasurer of the City or his or her authorized agent. Such money shall be placed in a special revenue fund which is hereby created and which shall be known as the “park dedication in-lieu fee fund.” Money within this fund shall be used and expended solely for the acquisition, improvement, expansion or implementation of parks and recreational facilities reasonably related to serving the public by way of the purchase of necessary land, or, if the City Council deems that there is sufficient land available for this use, then secondly this money shall be used for improving such land for park and recreational purposes. C. 18.24.070 Criteria for Requiring Both Dedication and Fee. In subdivisions of over fifty parcels, the subdivider shall both dedicate land and pay a fee in lieu thereof in accordance with the following formula: A. When only a portion of the land to be subdivided is proposed in the open space and conservation element of the General Plan as the site for a local park, the portion shall be dedicated for local park purposes and a fee computed pursuant to the provisions of Section 18.24.080 060, shall be paid for any additional land that would have been required to be dedicated pursuant to Section 18.24.050, Standards and Formula for Dedication of Land. B. When a major part of the local park or recreational site has already been acquired by the City and only a small portion of land is needed from the subdivision to complete the site, the remaining portion shall be dedicated and a fee computed pursuant to the provisions of Section 18.24.080 060, shall be paid in an amount equal to the value of the land which would otherwise have been required to be dedicated pursuant to Section 18.24.050, Standards and Formula for Dedication of Land, the fees to be used for the improvement of the existing park and recreational facility or for the improvement of other local parks and recreational facilities in the area serving the subdivision. MOVED TO CHAPTER 13.08 1241 - 10 - 18.24.080 Amount of Fee in Lieu of Park Land Dedication. A. When a fee is required to be paid in lieu of park land dedication, the amount of the fee shall be determined, by the Director of Public Works, based upon the fair market value of the land which would otherwise be required to be dedicated pursuant to Section 18.24.050, Standards and Formula for Dedication of Land, determined by reference to comparable land within the general area of the subject land. As used herein, the term “comparable” means land of similar size and development potential as the land which would otherwise be dedicated. The date of valuation of the property for in-lieu fee purposes shall be the date that the subdivider submits his or her written request for a final subdivision map. B. The fee shall be paid pursuant to the provisions contained in Section 18.24.060, Formula for Fees in Lieu of Land Dedication. C. If a subdivider objects to the fair market value determination made by the Director of Public Works, he or she may, at his or her own expense, obtain an appraisal of the property by a qualified real estate appraiser approved by the City, which appraisal of fair market value may be accepted by the City Council, if found reasonable. Alternatively, the City and the subdivider may agree as to the fair market value. 18.24.090 080 Subdividers Not Within General Plan. Where the proposed subdivision lies within an area not thennot included but to be included within the City’s General Plan, the subdivider shall dedicate land, pay a fee in lieu, or both, in accordance with the adopted park and recreational principles and standards of the City’s General Plan and in accordance with the provisions of this chapter. 18.24.100 090 Determination of Land or Fee. A. If the relationship between a proposed subdivision containing fifty parcels or more and the open space and conservation element is unclear, the City Council shall determine whether it accepts land dedication or elects to require payment of a fee, by consideration of the standards identified in Section 13.08.070.following: 1. Topography, geology, access and location of land in the subdivision available for dedication; 2. Size and shape of the subdivision and land available for dedication; 3. Feasibility of dedication; 4.A. Availability of previously acquired park property. B. The determination of the City as to whether land shall be dedicated, or whether a fee shall be charged, or a combination thereof, shall be final and conclusive. 18.24.110 100 Credit for Private Recreation or Open Space. Where private open space for park and recreational purposes is provided in a proposed subdivision, a fifty percent credit shall be given against the requirement of land dedication or payment of fees in lieu thereof, pursuant to requirements of Section 13.08.080. if the City MOVED TO CHAPTER 13.08 1242 - 11 - Council finds that it is in the public interest to do so and that all the following standards are met: A. That yards, court areas, setbacks, decorative landscape areas normally associated with residential site design and other open areas required to be maintained by the zoning and building ordinances and regulations shall not be included in the computation of such private open space; B. That such space is to be wholly or partially owned and maintained by the future residents of the subdivision and that the private ownership and maintenance of the open space is adequately provided for by recorded written agreement, conveyance or restrictions; C. That the use of the private open space is restricted for park and recreational purposes by recorded covenant, which runs with the land in favor of the future owners of property and which cannot be defeated or eliminated without the consent of the City or its successor; D. That the proposed private open space is reasonably adaptable for use for park and recreational purposes, taking into consideration such factors as size, shape, topography, geology, access and location; E. That facilities proposed for the open space are in substantial accordance with the provisions of the open space and conservation element of the General Plan; and F. That the open space for which credit is given complies with the following standards: 1. The total usable open space acreage must be equivalent to a ratio of three acres of land for each one thousand person, or a fraction thereof, generated by the development. The computation for determining acreage is described in Section 18.24.050, Standards and Formula for Dedication of Land. 2. The open space must contain the following mandatory elements and at least four of the six optional elements: The combined minimum acreage for a facility with a recreation center and children’s play apparatus area is 1.3 acres. The minimum combined acreage for a facility not including a recreation center or children’s play area is 1.5 acres. The City Council may grant park credit for a combination of the above elements or a combination of the above elements and other recreation improvements that will meet the specific recreation needs of a specialized housing development, such as a senior housing development with occupancy controlled via a covenant with the City named as a third party beneficiary. Before credit is given, the City Council shall adopt written findings that the above standards are met, and shall require the recordation of covenants running with the land to ensure that credited elements are maintained. MOVED TO CHAPTER 13.08 MOVED TO CHAPTER 13.08 1243 - 12 - 18.24.115 110 Credit for Existing Residential Units. Where any lot or lots of a proposed subdivision contains existing residential units, a credit shall be given against the requirement of land dedication or payment of fees in lieu thereof for each lot which contains residential unit or units. As used herein, the term “existing” refers to a residential unit or units which exist at the time of the recordation of a final map or which were demolished within one year prior of the tentative map application. 18.24.120 Procedure. A. At the time of approval of the tentative subdivision map, the City Council shall determine pursuant to Section 18.24.100 the land to be dedicated and/or fees to be paid by the subdivider. B. At the time of the filing of the final subdivision map, the subdivider shall dedicate the land/or pay the fees as previously determined by the City Council. C. Open space covenants for private park or recreational facilities shall be submitted to the City prior to approval of the final subdivision map and shall be recorded simultaneously with the final subdivision map. Minimum Acreage Mandatory Element Turfed playfield .50 The playfield shall be a single unit of land which is generally level and free of physical barriers which would inhibit group play activities. Optional Elements Children’s play apparatus area .15 Recreational community gardens .25 Family picnic area .25 Game court area .25 Swim pool (42’ x 75’ with adjacent deck and lawn areas) .25 Recreation center buildings and grounds .15 1244 - 13 - 18.24.130 Commencement of Development. At the time of approval of the final subdivision map, the City Council shall specify when development of the park or recreational facilities shall be commenced. Article III. School Site Dedication. 18.24.140 General. Unless otherwise prohibited by law, as a condition of approval of a final subdivision map, a subdivider who develops or completes the development of one or more subdivisions within a school district shall dedicate to the school district such lands as the City Council shall deem to be necessary for the purpose of constructing thereon schools necessary to assure the residents of the subdivision adequate elementary school service. 18.24.150 Procedure. The requirement of dedication shall be imposed at the time of approval of the tentative map. If within thirty days after the requirement of dedication is imposed by the City the school district does not offer to enter into a binding commitment with the subdivider to accept the dedication, the requirement shall be automatically terminated. The required dedication may be made any time before, concurrently with, or up to sixty days after the filing of the final map on any portion of the subdivision. 18.24.160 Payments to Subdivider for School Site Dedication. The school district shall, if it accepts the dedication, repay to the subdivider or his or her successors the original cost to the subdivider of the dedicated land, plus a sum equal to the total of the following amounts: A. The cost of any improvements to the dedicated land since acquisition by the subdivider; B. The taxes assessed against the dedicated land from the date of the school district’s offer to enter into the binding commitment to accept the dedication; C. Any other costs incurred by the subdivider in maintenance of such dedicated land, including interest costs incurred on any loan covering such land. 18.24.170 Exemptions. The provisions of this article shall not be applicable to a subdivider who has owned the land being subdivided for more than ten years prior to the filing of the tentative maps. Article IV. Reservations. 18.24.180 General. As a condition of approval of a map, the subdivider shall reserve sites, appropriate in area and location, for parks, recreational facilities, fire stations, libraries or other public uses according to the standards and formula contained in this article. 1245 - 14 - 18.24.190 Standards for Reservation of Land. Where a park, recreational facility, fire station, library, or other public use is shown on an adopted specific plan or adopted general plan containing a community facilities element, recreation and parks element and/or a public building element, the subdivider may be required by the City to reserve sites as so determined by the City or County in accordance with the definite principles and standards contained in the above specific plan or General Plan. The reserved area must be of such size and shape as to permit the balance of the property within which the reservation is located to develop in an orderly and efficient manner. The amount of land to be reserved shall not make development of the remaining land held by the subdivider economically unfeasible. The reserved area shall conform to the adopted specific plan or General Plan and shall be in such multiples of streets and parcels as to permit an efficient division of the reserved area in the event that it is not acquired within the prescribed period. 18.24.200 Procedure. The public agency for whose benefit an area has been reserved shall, at the time of approval of the final map or parcel map, enter into a binding agreement to acquire reserved area within two years after the completion and acceptance of all improvements, unless the period of time is extended by mutual agreement. 18.24.210 Payment to Subdivider. The purchase price shall be the market value at the time of the filing of the tentative map plus the taxes against such reserved area from the date of the reservation and any other costs incurred by the subdivider in the maintenance of the reserved area, including interest costs incurred on any loan covering the reserved area. 18.24.220 Termination. If the public agency for whose benefit an area has been reserved does not enter into a binding agreement, the reservation of the area shall automatically terminate. Article V. Waiver of Direct Street Access. 18.24.230 Waiver of Direct Street Access. A. The City may require as a condition of approval of any subdivision the waiver of direct access rights to proposed or existing streets from any property within the subdivision and abutting thereon. B. Any waiver shall become effective in accordance with its provisions and shall be contained in the owner’s certificate of the final map or parcel map. CHAPTER 19.08: DEFINITIONS Section 19.08.010 Purpose and Applicability. 19.08.020 General Rules for Construction of Language. 19.08.030 Definitions. 1246 - 15 - 19.08.010 Purpose and Applicability. The purpose of this chapter is to promote consistency and precision in the interpretation of zoning regulations. The meaning and construction of words and phrases defined in this chapter shall apply throughout the zoning regulations, except where the context of such word or phrases clearly indicates a different meaning or construction. 19.08.020 General Rules for Construction of Language. The following general rules of construction shall apply to the text of the zoning regulations: A. The particular shall control the general. B. In case of any difference of meaning or implication between the text of any provision and any caption or illustration, the text shall control. C. The word “shall” is always mandatory and not discretionary. The word “may” is discretionary. D. References in the masculine and feminine genders are interchangeable. E. Words used in the singular include the plural, and the plural includes the singular, unless the context clearly indicates the contrary. F. The words “activities” and “facilities” include any part thereof. G. Unless the context clearly indicates to the contrary, the following conjunctions shall be interpreted as follows: 1. “And” indicates that all connected items or provisions shall apply; 2. “Or” indicates that the connected items or provisions may apply singly or in any combination; 3. “Either . . . or” indicates that the connected items or provisions shall apply singly but not in combination. H. The words “lot” and “parcel” are interchangeable. I. The word “building” includes the word “structure.” J. All public officials, bodies, and agencies to which reference is made are those of the City unless otherwise indicated. K. “City” means the City of Cupertino. 19.08.030 Definitions. Throughout this title the following words and phrases shall have the meanings ascribed in this section. A. “A” Definitions: “Abandon” means to cease or discontinue a use or activity without intent to resume, but excluding temporary or short-term interruptions to a use or activity during periods of 1247 - 16 - remodeling, maintaining, or otherwise improving or rearranging a facility, or during normal periods of vacation or seasonal closure. “Abutting” means having property or district lines in common. “Accessory building” means a building which is incidental to and customarily associated with a specific principal use or facility and which meets the applicable conditions set forth in Chapter 19.100, Accessory Buildings/Structures. “Accessory structure” means a subordinate structure, the use of which is purely incidental to that of the main building and which shall not contain living or sleeping quarters. Examples include a deck, tennis courts, trellis or car shelter. Fences eight feet or less are excluded. “Addition” means any construction which increases the size of a building or facility in terms of site coverage, height, length, width, or gross floor area ratio.“Adjacent property” means property that abuts the subject property, including property whose only contiguity to the subject site is a single point and property directly opposite the subject property and located across a street. “Adult bookstore” means a building or portion thereof used by an establishment having as a substantial or significant portion of its stock in trade for sale to the public or certain members thereof, books, magazines, and other publications which are distinguished or characterized by their emphasis on matter depicting, describing or relating to “specified sexual activities” or “specified anatomical areas,” as hereinafter defined. “Adult cabaret” means a building or portion thereof used for dancing purposes thereof or area used for presentation or exhibition or featuring of topless or bottomless dancers, strippers, male or female impersonators or similar entertainers, for observations by patrons or customers. “Adult motion picture theater” means a building or portion thereof or area, open or enclosed, used for the presentation of motion pictures distinguished or characterized by an emphasis on matter depicting, describing or relating to “specified sexual activities” or “specified anatomical areas,” as hereinafter defined, for observation by patrons or customers. “Advertising statuary” means a structure or device of any kind or character for outdoor advertising purposes which displays or promotes a particular product or service, but without name identification. “Aerial” means a stationary transmitting and/or receiving wireless communication device consisting of one or any combination of the elements listed below: 1. “Antenna” means a horizontal or vertical element or array, panel or dish that may be attached to a mast or a tower for the purpose of transmitting or receiving radio or microwave frequency signals. 2. “Mast” means a vertical element consisting of a tube or rod which supports an antenna. 3. “Tower” means a vertical framework of cross elements which supports either an antenna, mast or both. 1248 - 17 - 4. “Guy wires” means wires necessary to insure the safety and stability of an antenna, mast or both. “Affordable units” means housing units in which the rent does not exceed thirty percent of the HUD income limits for lower and very low income households for the Santa Clara County Metropolitan Statistical Area, adjusted for household size. “Affordable housing cost” means the amount set forth in the Health and Safety Code Section 50052.5, as may be amended. “Affordable rent” means the amount set forth in the Health and Safety Code Section 50053, as may be amended. “Agriculture” means the tilling of the soil, the raising of crops, horticulture, agriculture, livestock farming, dairying, or animal husbandry, including slaughterhouses, fertilizer yards, bone yard, or plants for the reduction of animal matter or any other similar use. “Alley” means a public or private vehicular way less than thirty feet in width affording a secondary means of vehicular access to abutting property. “Alteration”, for purposes of the Sign Ordinance, means any permanent change to a sign. “Alteration” means any construction or physical change in the arrangement of rooms or the supporting members of a building or structure, or change in the relative position of buildings or structures on a site, or substantial change in appearances of any building or structure. 1. “Incidental alteration” means any alteration to interior partitions or interior supporting members of a structure which does not increase the structural strength of the structure; any alteration to electrical, plumbing, heating, air conditioning, ventilating, or other utility services, fixtures, or appliances; any addition, closing, or change in size of doors or windows in the exterior walls; or any replacement of a building facade which does not increase the structural strength of the structure. 2. “Structural alteration” means any alteration not deemed an incidental alteration. “Amusement park” means a commercial facility which supplies various forms of indoor and outdoor entertainment and refreshments. Animal: 1. Animal, Adult. “Adult animal” means any animal four months of age or older. 2. Animal, Large. “Large animal” means any equine, bovine, sheep, goat or swine or similar domestic or wild animal, as determined by the Planning Commission. 3. Animal, Small. “Small animal” means animals which are commonly found in single-family residential areas such as chickens, ducks, geese, rabbits, dogs, cats, etc. “Animal care” means a use providing grooming, housing, medical care, or other services to animals, including veterinary services, animal hospitals, overnight or short-term boarding ancillary to veterinary care, indoor or outdoor kennels, and similar services. “Apartment” means a room or a suite of two or more rooms which is designed for, intended for, and occupied by one family doing its cooking there. CO N F O R M A N C E WI T H S T A T E L A W 1249 - 18 - “Apartment house” means a building designed and used to house three or more families, living independently of each other. “Apartment project” means a rental housing development consisting of two or more dwelling units. “Approval Body” means the Director of Community Development and his/her designee, the Planning Commission or City Council depending upon context. “Architectural feature” means any part or appurtenance of a building or structure which is not a portion of the living area of the building or structure. Examples include: cornices, canopies, eaves, awnings, fireplaces, or projecting window elements. Patio covers or any projection of the floor area shall not constitute an architectural projection. “Architectural projection,” for purposes of the Sign Ordinance, means any permanent extension from the structure of a building, including the likes of canopies, awnings and fascia. “Atrium” means a courtyard completely enclosed by walls and/or fences. “Attic” means an area between the ceiling and roof of a structure, which is unconditioned (not heated or cooled) and uninhabitable. “Automotive service station” means a use providing gasoline, oil, tires, small parts and accessories, and services incidental thereto, for automobiles, light trucks, and similar motor vehicles. Automotive maintenance and repair (minor) may be conducted on the site. The sale of food or grocery items on the same site is prohibited except for soft drinks and snack foods, either from automatic vending machines or from shelves. The sale of alcoholic beverages on the site is governed by Chapter 19.132, Concurrent Sale of Alcoholic Beverages and Gasoline. “Automotive repair and maintenance (minor)” means the supplying of routine automotive services such as lubrication, engine tune-ups, smog certificates, servicing of tires, brakes, batteries and similar accessories, and minor repairs involving engine accessories. Any repair which requires the engine, drive train, transmission assembly, exhaust system, or drive train parts to be removed from a motor vehicle or requires the removal of internal parts shall not be considered minor. Body and paint shop operations are not minor repairs or maintenance. “Average slope” means the ratio between vertical and horizontal distance expressed in percent; the mathematical expression is based upon the formula described below: S =   I x L x 100 A S = Average slope of ground in percent; L = Combined length in feet of all contours on parcel; I = Contour interval in feet; A = Area of parcel in square feet. B. “B” Definitions: “Banner” means a temporary display consisting of fabric, canvas, plastic or paper material which is attached to a building, vehicle, pole or other form of support. 1250 - 19 - “Basement” means any floor below the first story in a building that is fully submerged below grade except for lightwells required for light, ventilation and emergency egress. A basement may have a maximum exterior wall height of two feet between natural grade and ceiling. “Block” means any lot or group of contiguous lots bounded on all sides by streets, railroad rights-of-way, or waterways, and not traversed by any street, railroad right-of-way or waterway. “Boarding house” means any building used for the renting of rooms or providing of table board for from three to five persons, inclusive, over the age of sixteen years, who are not members of the same family. “Building” means any structure used or intended for supporting or sheltering any use or occupancy when any portion of a building is completely separated from every other portion by a “Fire Barrier” as defined by the California Building Code, then each portion shall be deemed to be a separate building. 1. “Attached building” means buildings which are structurally connected by any structural members or wall, excluding decks, patios or fences. “Building coverage” means that portion of the net lot area encompassed within the outermost wall line which defines a building enclosure. “Building frontage” means the length or the surface of the building wall which faces, and is visible to the general public from, a private or public right-of-way or driveway. “Business” or “commerce” means the purchase, sale or other transaction involving the handling or disposition of any article, substance or commodity for profit or livelihood, including, in addition, office buildings, offices, shops for the sale of personal services, garages, outdoor advertising signs and structures, hotels and motels, and recreational and amusement enterprises conducted for profit. “Business or trade school” means a use, except a college or university, providing education or training in business, commerce, language, or similar activity or pursuit, and not otherwise defined as a home occupation. C. “C” Definitions: “Canopy” means any roof-like structure, either attached to another structure or freestanding, or any extension of a roof line, constructed for the purpose of protection from the elements or aesthetic purposes in connection with outdoor living. “Car shelter” means a roofed structure or a part of a building not enclosed by walls, intended and designed to accommodate one or more vehicles. “Caretaker” means a person or persons employed for the purpose of protecting the principal use of the property or structure. “Centerline” means the centerline as established by the County Surveyor of Santa Clara County, the City Engineer, or by the State Division of Highways of the State of California. 1251 - 20 - “Changeable copy sign” means any sign, or portion, which provides for each manual changes to the visible message without changing structural surfaces, including the likes of theater marquees and gasoline service station price signs, but excluding electronic readerboard signs and signs which display the current time or temperature. “Change of face” means any changes to the letter style, size, color, background, or message. “Change of use” means the replacement of an existing use by a new use, or a change in the nature of an existing use, but not including a change in ownership, tenancy or management where the previous nature of the use, line of business, or other function is substantially unchanged. “Child” means a person who is under eighteen years of age. “Child day care facility” means a facility, licensed by the State or County, which provides non- medical care to children in need of personal services, supervision, or assistance essential for sustaining the activities of daily living or for the protection of the individual on less than a twenty-four -hour basis. Child day care facility includes day care centers, employer sponsored child-care centers and family day care homes. “Church” means a use providing facilities for organized religious worship and religious education incidental thereto, but excluding a private educational facility. A property tax exemption obtained pursuant to Section 3(f) of Article XIII of the Constitution of the State of California and Section 206 of the Revenue and Taxation Code of the State of California, or successor legislation, constitutes prima facie evidence that such use is a church as defined in this section. “College” or “university” means an educational institution of higher learning which offers a course of studies designed to culminate in the issuance of a degree or defined by Section 94110 of the Education Code of the State of California, or successor legislation. “Collocation” means the placement of aerials and other facilities belonging to two or more communication service providers on a single mast or building. “Commercial recreation” means a use providing recreation, amusement, or entertainment services, including theaters, bowling lanes, billiard parlors, skating arenas, and similar services, operated on a private or for-profit basis, but excluding uses defined as outdoor recreation services. “Community center” means a place, structure, area, or other facility used for and providing religious, fraternal, social and/or recreational programs generally open to the public and designated to accommodate and serve a significant segment of the community. “Commercial district,” for purposes of the Sign Ordinance, means an area of land designated for commercial use in the current Cupertino General Plan. “Common interest development” means the following, all definitions of which are based upon Civil Code Section 4100 or subsequent amendments: 1. aA condominium project, CO R R E C T I O N CO N F O R M A N C E WI T H S T A T E L A W 1252 - 21 - 2. aA community apartment project, containing two or more rights of exclusive occupancy, or 3. aA stock cooperative, containing two or more separately owned lots, parcels or areas,or 4. A planned development all definitions are based upon Civil Code Section 1351 or subsequent amendments. “Community organization” means a nonprofit organization based in the City and whose activities benefit the City, its residents, employees, or businesses. “Concession” means a benefit offered by the City to facilitate construction of eligible projects as defined by the provisions of this chapter. Benefits may include, but are not limited to, priority processing, fee deferments and waivers, granting of variances, and relaxation of otherwise applicable permit conditions or other concessions required by law. “Condominium” means and includes: 1. “Condominium” as defined by Section 783 of the Civil Code; 2. “Community apartment project” as defined by Section 11004 of the Business and Professions Code; 3. “Stock cooperative” as defined by Section 11003.2 of the Business and Professions Code; and 4. “Planned development” as defined by Section 11003 of the Business and Professions Code. The term “condominium” specifically includes, but is not limited to, the conversion of any existing structure for sale pursuant to a method described in this title. “Condominium conversion” or “Conversion” means a change in the type of ownership of a parcel (or parcels) of land, together with the existing attached structures, to that defined as a common interest development, regardless of the present or prior use of such land and structures and whether substantial improvements have been made or are to be made to such structure. “Condominium project” or “project” includes the real property and any structures thereon, or any structures to be constructed thereon, which are to be divided into condominium ownership. “Condominium units” or “units” means the individual spaces within a condominium project owned as individual estates. “Congregate residence” means any building or portion which contains facilities for living, sleeping and sanitation, as required by the California Building Code and may include facilities for eating and cooking for occupancies other than a family. A congregate residence may be a shelter, convent or monastery but does not include jails, hospitals, nursing homes, hotels or lodging houses. “Convalescent facility” means a use other than a residential care home providing inpatient services for persons requiring medical attention, but not providing surgical or emergency medical services. “Convenience market” means a use or activity that includes the retail sale of food, beverages, and small personal convenience items, including sale of food in disposable containers primarily RE D U N D A N C Y CO N F O R M A N C E WI T H S T A T E L A W 1253 - 22 - for off-premises consumption, and typically found in establishments with long or late hours of operation and in relatively small buildings, but excluding delicatessens and other specialty food shops and establishments which have a sizable assortment of fresh fruits, vegetables, and fresh- cut meats. “Corner triangle” means a triangular-shaped area bounded by the following, unless deemed otherwise by the City Engineer: 1. The intersection of the tangential extension of front and street side property lines as formed by the intersection of two public rights-of-way abutting the said property lines; and 2. The third boundary of the triangular-shaped area shall be a line connecting the front and side property lines at a distance of forty feet from the intersection of the tangential extension of front and side property lines. “Corner triangle,” for purposes of the Sign Ordinance, means a triangular-shaped area of land adjacent to an intersection of public rights-of-way, as further defined in Cupertino Standard Details Drawings Nos. 7-2 and 7-4. (See Appendix A, Cupertino Standard Detail 7-2; Corner Triangle–Controlled Intersections, and B, Cupertino Standard Detail 7-4; Corner Triangle– Uncontrolled Intersections for details.) “Court” means an open, unoccupied space, other than a yard, on the same lot with a building or buildings and which is bounded on two or more sides by such building or buildings, including the open space in a house court or court apartment providing access. “Covered parking” means a carport or garage that provides full overhead protection from the elements with ordinary roof coverings. Canvas, lath, fiberglass and vegetation are not ordinarily roof coverings and cannot be used in providing a covered parking space. D. “D” Definitions: “Day care center” means any child day care facility, licensed by the State or County, other than a family day care home, and includes infant centers, preschools, and extended day care facilities. Day Care Home, Family. “Family day care home” means a home, licensed by the State or County, which regularly provides care, protection and supervision for fourteen or fewer children, in the provider’s own home, for periods of less than twenty-four hours per day, while the parents or guardian are away, and includes the following: 1. “Large-family day care home,” which means a home which provides family day care for seven to fourteen children, inclusive, including children under the age of ten years who reside at the home, as set forth in the California Health and Safety Code Section 1597.465; 2. “Small-family day care home,” which means a home which provides family day care to eight or fewer children, including children under the age of ten years who resides at the home, as set forth in the California Health and Safety Code Section 1597.44. “Decorative statuary,” for purposes of the Sign Ordinance, means any structure or device of any kind or character placed solely for aesthetic purposes and not to promote any product or service. 1254 - 23 - “Demonstrated safety” means a condition requiring protection from the threat of danger, harm, or loss, including but not limited to the steepness of a roadway or driveway that may create a hazardous parking situation in front of a gate. “Demonstrated security” means a condition requiring protection from the potential threat of danger, harm or loss, including but not limited to a location that is isolated and invisible from public view or that has experienced documented burglary, theft, vandalism or trespassing incidences. “Density bonus” means a density increase over the otherwise maximum allowable residential density in accordance with the provisions of Chapter 19.56. an increase in the number of dwelling units authorized for a particular parcel of land beyond the maximum allowed by the General Plan range specified on the land use map of the City of Cupertino General Plan as of the date of the project application, controlled through the Government Code process. “Developer” means the owner or subdivider with a controlling proprietary interest in the proposed common interest development, or the person or organization making application, or a qualified applicant who has entered into a development agreement pursuant to the procedures specified in Chapter 19.144. “Development agreement” means a development agreement enacted by legislation between the City and a qualified applicant pursuant to Government Code Sections 65864 through 65869.5. "Development standard" means a site or construction regulation, including, but not limited to, a setback requirement, a floor area ratio, an onsite open-space requirement, or a parking ratio that applies to a development pursuant to any ordinance, general plan element, specific plan, charter, or other local condition, law, policy, resolution, or regulation. “District” means a portion of the property within the City within which certain uses of land, premises and buildings are permitted and certain other uses of land, premises and buildings are prohibited, and within which certain yards and other open spaces are required and certain building site areas are established for buildings, all as set forth and specified in this title. “Drinking establishment” means an activity that is primarily devoted to the selling of alcoholic beverages for consumption on the premises. “Drive-through establishment” means an activity where a portion of retailing or the provision of service can be conducted without requiring the customer to leave his or her car. “Driveway” means any driveway that provides direct access to a public or private street. Driveway, Curved. “Curved driveway” means a driveway with access to the front property line which enters the garage from the side at an angle of sixty degrees or greater to the front curbline and which contains a functional twenty-foot-deep parking area that does not overhang the front property line. “Duplex” means a building, on a lot under one ownership, containing not more than two kitchens, designed and used to house not more than two families living independently of each other. CO N F O R M A N C E WI T H S T A T E L A W CO N F O R M A N C E WI T H S T A T E L A W MO V E D F R O M CH A P T E R 1 9 . 2 0 1255 - 24 - “Dwelling unit” means a room or group of rooms including living, sleeping, eating, cooking and sanitation facilities, constituting a separate and independent housekeeping unit, occupied or intended for occupancy by one family on a nontransient basis and having not more than one kitchen. E. “E” Definitions: “Economically feasible” means when a housing project can be built with a reasonable rate of return. The housing developer’s financial ability to build the project shall not be a factor. Emergency Shelter: “Emergency shelter, rotating” means a facility that provides temporary housing with minimal supportive services. Shelters shall be limited to a time period of two months in a twelve-month period at any single location and shall and meets criteria in Section 19.76.030(2)19.64.040(A). “Emergency shelter, permanent” means a permanently operated facility that provides temporary housing with minimal supportive services that is limited to occupancy of six months or less. Shelters may be permanently operated and shall and meets criteria in Section 19.76.030(3)19.64.040(B). “Employee Housing” means accommodations for employees as defined by Health and Safety Code 17008, as may be amended. “Enclosed” means a covered space fully surrounded by walls, including windows, doors and similar openings or architectural features, or an open space of less than one hundred square feet fully surrounded by a building or walls exceeding eight feet in height. “Entry feature” means a structural element, which leads to an entry door. “Equestrian center” means a facility for the shelter, display, exhibition, keeping, exercise or riding of horses, ponies or mules, or vehicles drawn by such animals, with related pasture lands, corrals and trails. “Equipment yard” means a use providing for maintenance, servicing or storage of motor vehicles, equipment or supplies; or for the dispatching of service vehicles; or distribution of supplies or construction materials required in connection with a business activity, public utility service, transportation service, or similar activity, including but not limited to, a construction material yard, corporation yard, vehicular service center or similar use. F. “F” Definitions: “Facility” means a structure, building or other physical contrivance or object. 1. “Accessory facility” means a facility which is incidental to, and customarily associated with a specified principal facility and which meets the applicable conditions set forth in Chapter 19.80. 2. “Noncomplying facility” means a facility which is in violation of any of the site development regulations or other regulations established by this title, but was lawfully existing on October 10, 1955, or any amendment to this title, or the application of any district to the property involved by reason of which the adoption or application the facility CO N F O R M A N C E WI T H S T A T E L A W RE D U N D A N C Y 1256 - 25 - becomes noncomplying. (For the definition for “nonconforming use” see the definition “use” in this chapter.) 3. “Principal facilities” means a main building or other facility which is designed and constructed for or occupied by a principal use. “Family” means an individual or group of persons living together who constitute a bona fide single housekeeping unit in a dwelling unit. “Family” shall not be construed to include a fraternity, sorority, club, or other group of persons occupying a hotel, lodging house, or institution of any kind. “Fence” means a man-made structure which is designed, intended or used to protect, defend or obscure the interior property of the owner from the view, trespass or passage of others upon that property. “Fence height” means the vertical distance from the highest point of the fence (excluding post caps) to the finish grade adjoining the fence. In a case where the finish grade is different for each side of the fence, the grade with the highest elevation shall be utilized in determining the fence height. “First floor” means that portion of a structure less than or equal to twenty feet in height, through which a vertical line extending from the highest point of exterior construction to the appropriate adjoining grade, passes through one story. “Flag” means any fabric, banner, or bunting containing distinctive colors, patterns, or symbols, used as a symbol of a government, political subdivision, or other entity. “Floor area” means the total area of all floors of a building measured to the outside surfaces of exterior walls, and including the following: 1. Halls; 2. Base of stairwells; 3. Base of elevator shafts; 4. Services and mechanical equipment rooms; 5. Interior building area above fifteen feet in height between any floor level and the ceiling above; 6. Basements with lightwells that do not conform to Section 19.28.060I; 7. In all zones except residential, permanently roofed, but either partially enclosed or unenclosed building features used for sales, service, display, storage or similar uses. “Floor area” shall not include the following: 1. Basements with lightwells that conform to Section 19.28.060I; 2. Lightwells; 3. Attic areas; 4. Parking facilities, other than residential garages, accessory to a permitted conditional use and located on the same site; 5. Roofed arcades, plazas, walkways, porches, breezeways, porticos, courts and similar features not substantially enclosed by exterior walls. “Floor area ratio” means the maximum ratio of gross floor area on a site to the total site area. “Foot-lambert” means a unit measurement of the brightness of light transmitted through or reflected from an object or surface. “Freeway” means any public roadway so designated by the State of California. “Front wall” means the wall of a building or other structure nearest the street upon which the building faces, but excluding certain architectural features as defined in this chapter. 1257 - 26 - G. “G” Definitions: “Garage” means an accessory building (completely enclosed) or an attached building used primarily for the storage of motor vehicles. “Gasoline service station” means any place of business which offers for sale any motor vehicle fuel to the public. “Grade” or “finished grade” means the lowest point of adjacent ground elevation of the finished surface of the ground paving, or sidewalk, excluding areas where grade has been raised by means of a berm, planter box, or similar landscaping feature, unless required for drainage, within the area between the building and the property line, or when the property line is more than five feet from the building, between the building and a line five feet from the building. “Gross lot area” means the horizontal area included within the property lines of a site plus the street area bounded by the street centerline up to thirty feet distant from the property line, the street right-of-way line and the extended side yard to the street centerline. “Group home” means a state-authorized, certified or licensed family care home, foster home, or group home serving six or fewer mentally disordered or otherwise handicapped persons or dependent and neglected children. “Guest room” means a room which is intended, arranged or designed to be occupied by occasional visitors or nonpaying guests of the occupants of the dwelling unit in which the room is located, and which contains no kitchen facilities. H. “H” Definitions: “Habitable floor” means the horizontal space between a floor area of at least seventy square feet and the ceiling height measuring at least seven feet six inches above it, except for a kitchen which shall have a ceiling height not less than seven feet above the floor. “Habitable space” means space in a structure for living, sleeping, eating or cooking. Bathrooms, toilet compartment, closets, halls, storage or utility space and similar areas are not considered habitable space. “Heavy equipment” means any mechanical or motorized device that is not a vehicle or a commercial vehicle as defined in 19.08.030(V), including, but not limited to, a backhoe, cement mixer, crane, ditch witch, dozer, earth mover, generator, grader, tractor or any similar device. “Height” means a vertical distance measured parallel to the natural grade to the RE D U N D A N C Y Height Limit for Entry Features 1258 - 27 - highest point of exterior construction, exclusive of chimneys, antennas or other appurtenances, except that entry features are measured to the top of the wall plate. Height restriction shall be established by establishing a line parallel to the natural grade. “Height”, for purposes of the Accessory Buildings/ Structures, encompasses the entire wall plane nearest the property line, including roof, eaves, and any portion of the foundation visible above the adjoining finished grade. “Home occupation” means a business, profession, occupation or trade activity which is performed by the resident(s) of a dwelling unit within that dwelling unit, or a yard area or garage associated with that dwelling unit, or a yard area or garage associated with that unit, for purposes of generating income, by means of the manufacture, and/or sale of goods and/or services, but which activity is clearly incidental to the use of the dwelling for residential purposes. “Hospital” means a facility for providing medical, psychiatric or surgical services for sick or injured persons, primarily on an inpatient basis, and including ancillary facilities for outpatient and emergency treatment, diagnostic services, training, research, administration, and service to patients, employees or visitors. “Hotel” means a facility containing rooms or groups of rooms, generally without individual kitchen facilities, used or intended to be used by temporary overnight occupants, whether on a transient or residential occupancy basis, and whether or not eating facilities are available on the premises. Hotel includes motel, motor hotel, tourist court, or similar use, but does not include mobilehome parks or similar uses. “Household pets” means small animals commonly found in residential areas such as chickens, ducks, geese, rabbits, dogs, and cats, but excluding animals such as any bovine or equine animal, or any goat, sheep or swine. This title does not regulate the keeping of small household pets, such as fish, birds or hamsters, which is incidental to any permitted use. However, no animal including household pets may be kept, maintained and/or raised for commercial purposes except where permitted with required permits. “Household type” means whether the occupants of the housing units are very low income, lower income, moderate income, or senior citizens. “Housing development” means, for the purposes of Chapter 19.56, Density Bonus, a development project for five or more residential units. For the purposes of that chapter, "housing development" also includes a subdivision or common interest development, approved by the City that consists of residential units or unimproved residential lots and either a project to substantially rehabilitate and convert an existing commercial building to residential use or the substantial rehabilitation of an existing multifamily dwelling, as defined in Government Code Section 65863.4(d), where the result of the rehabilitation would be a net increase in available residential units. one or more groups of projects with residential units constructed in the planned development of the City. CO N F O R M A N C E WI T H S T A T E L A W 1259 - 28 - I. “I” Definitions: “Industrial district,” for purposes of the Sign Ordinance, means all ML districts and any other zoning classifications which are consistent with the industrial designation of the Cupertino general plan. “Institutional district,” for purposes of the Sign Ordinance, means all BQ, PR, FP, and BA districts and other zoning classifications and uses which are considered institutional in nature and are consistent with the institutional or quasi-public designation of the general plan. J. “J” Definitions: “Junkyard” means the use of more than two hundred square feet of the area of any lot for the storage or keeping of junk, including scrap metals or other scrap material, and/or for the dismantling or wrecking of automobiles or other vehicles or machinery. K. “K” Definitions: “Kitchen” means an area in habitable space used for the preparation of food and including at least three of the following: 1. Cooking appliance(s) or provision for a cooking appliance (such as 220V outlets, gas connections and space for appliances between counters; 2. Counter; 3. Refrigerator; and 4. Sink. L. “L” Definitions: “Landscaping” means an area devoted to or developed and maintained with native or exotic planting, lawn, ground cover, gardens, trees, shrubs, and other plant materials, decorative outdoor landscape elements, pools, fountains, water features, paved or decorated surfaces of rock, stone, brick, block or similar material (excluding driveways, parking, loading or storage areas), and sculptural elements. “Late evening activities” means an activity which maintains any hours of operation during the period of eleven p.m. to seven a.m. “Legal substandard lot” means any parcel of land or lot recorded and legally created by the County or City prior to March 17, 1980, which lot or parcel is of less area than required in the zone; or lots or parcels of record which are reduced to a substandard lot size as a result of required street dedication unless otherwise provided in the City of Cupertino General Plan. The owner of a legally created, substandard property which is less than six thousand square feet but equal to or greater than five thousand square feet may utilize such parcel for residential purposes. The owner of a legally created parcel of less than five thousand square feet may also develop the site as a single-family residential building site if it can be demonstrated that the property was not under the same ownership as any contiguous property on the same street frontage as of or after July 1, 1984. “Lightwell” means an excavated area required by the Uniform Building Code to provide emergency egress, light and ventilation for below grade rooms. “Liquor store” means a use requiring a State of California “off-sale general license” (sale for off- site consumption of wine, beer and/or hard liquor) and having fifty percent or more of the total dollar sales accounted for by beverage covered under the off-sale general license. 1260 - 29 - “Living space” means habitable space and sanitation. “Loading space” means an area used for loading or unloading of goods from a vehicle in connection with the use of the site on which such space is located. “Lodging” means the furnishing of rooms or groups of rooms within a dwelling unit or an accessory building to persons other than members of the family residence in the dwelling unit, for overnight occupancy on a residential occupancy basis, whether or not meals are provided to the person. Lodging shall be subject to the residential density requirements of the district in which the use is located. “Lodging unit” means a room or group of rooms not including a kitchen, used or intended for use by overnight occupants as a single unit, whether located in a hotel or a dwelling unit providing lodging where designed or used for occupancy by more than two persons; each two- person capacity shall be deemed a separate lodging unit for the purpose of determining residential density; each two lodging units shall be considered the equivalent of one dwelling unit. “Lot” means a parcel or portion of land separated from other parcels or portions by description, as on a subdivision or record of survey map, or by metes and bounds, for purpose of sale, lease or separate use. 1. “Corner lot” means a lot situated at the intersection of two or more streets, or bounded on two or more adjacent sides by street lines. 2. “Flag lot” means a lot having access to a street by means of a private driveway or parcel of land not otherwise meeting the requirement of this title for lot width. 3. “Interior lot” means a lot other than a corner lot. 4. “Key lot” means the first lot to the rear of a corner lot, the front line of which is a continuation of the side line of the corner lot, and fronting on the street which intersects or intercepts the street on which the corner lot fronts. “Lot area” means the area of a lot measured horizontally between boundary lot lines, but excluding a portion of a flag lot providing access to a street and lying between a front lot line and the street, and excluding any portion of a lot within the lines of any natural watercourse, river, stream, creek, waterway, channel or flood control or drainage easement and excluding any portion of a lot within a street right-of-way whether acquired in fee, easement or otherwise. “Lot coverage” means the following: 1. “Single-family residential use” means the total land area within a site that is covered by buildings, including all projections, but excluding ground-level paving, landscape features, lightwells, and open recreational facilities. 2. “All other uses except single-family residential” means the total land area within a site that is covered by buildings, excluding all projections, ground-level paving, landscape features, and open recreational facilities. 1261 - 30 - “Lot depth” means the horizontal distance from the midpoint of the front lot line to the midpoint of the rear lot line, or to the most distant point on any other lot line where there is no clear rear lot line. “Lot line” means any boundary of a lot. 1. “Front lot line” means on an interior lot, the lot line abutting a street, or on a corner lot, the shorter lot line abutting a street, or on a flag lot, the interior lot line most parallel to and nearest the street from which access is obtained. 2. “Interior lot line” means any lot line not abutting a street. 3. “Rear lot line” means the lot line not intersecting a front lot line which is most distant from and the most closely parallel to the front lot line. A lot bounded by only three lot lines will not have a rear lot line. 4. “Side lot line” means any lot line which is not a front or rear lot line. 5. “Street lot line” means any lot line abutting a street. “Lot of record” means a lot which is part of a subdivision recorded in the office of the County Recorder, or a lot or parcel described by metes and bounds which has been recorded. “Lot width” means the horizontal distance between side lot lines, measured at the required front setback line. “Lower-income household” means a household whose gross income is asdoes not exceed that established by Health and Safety Code Section 50079.5, as may be amended. M. “M” Definitions: “Major renovation,” for purposes of Chapter 19.116, Conversions of Apartment Projects to Common Interest Development, means any renovation for which an expenditure of more than one thousand dollars was made. “Major repair,” for purposes of Chapter 19.116, Conversions of Apartment Projects to Common Interest Development, means any repair for which an expenditure of more than one thousand dollars was made. “Manufacturing” means a use engaged in the manufacture, predominantly from previously prepared materials, of finished products or parts, including processing fabrication, assembly, treatment, packaging of products, but excluding basic industrial processing of extracted or raw materials, processes utilizing inflammable or explosive material (i.e., materials which ignite easily under normal manufacturing conditions), and processes which create hazardous or commonly recognized offensive conditions. “Massage” means any method of pressure on or friction against or stroking, kneading, rubbing, tapping, pounding, vibrating or stimulating the external parts of the human body with the hands or with any mechanical or electrical apparatus or other appliances or devices with or without such supplementary aides as rubbing alcohol, liniment, antiseptic, oil, powder, cream, lotion, ointment or other similar preparations. “Massage parlor” means a building or portion thereof, or a place where massage is administered for compensation or from which a massage business or service for compensation CO N F O R M A N C E WI T H S T A T E L A W 1262 - 31 - is operated which is not exempted or regulated by the Massage Establishment Ordinance as contained in Title 9, Health and Sanitation of the Cupertino Municipal Code, Chapter 9.06. “Maximum allowable residential density,” for purposes of Chapter 19.56, Density Bonus, means the maximum density allowed under the zoning ordinance and land use element of the general plan. For purposes of that Chapter, if the maximum density allowed under the zoning ordinance is inconsistent with the density allowed under the land use element of the general plan, the general plan density shall prevail. “Minor change” means an alteration or modification of an existing plan, development or project which is substantially inferior in bulk, degree or importance to the overall dimension and design of the plan, development or project with no change proposed for the use of the land in question, no change proposed in the character of the structure or structures involved, and no variance required. “Mobilehome” means a vehicle, other than a motor vehicle, designed or used as semi- permanent housing, designed for human habitation, for carrying persons and property on its own structure, and for being drawn by a motor vehicle, and shall include a trailer coach. “Mobilehome park” means any area or tract of land where lots are sold, rented, or held out for rent to one or more owners or users of mobilehomes, excluding travel-trailers, for the purpose of permanent or semi-permanent housing. “Moderate income household” means a household whose gross income does not exceed that established by Section 50093 of the Health and Safety Code, as may be amended. “Multiple-family use” means the use of a parcel for three or more dwelling units which may be in the same building or in separate buildings on the same parcel. N. “N” Definitions: “Natural grade” means the contour of the land prior to improvements or development, unless otherwise established by a city approved grading plan that is part of a subdivision map approval. “Net lot area” means the total area included within the property lines of a parcel, excluding the following: 1. Any portion of a parcel within the right-of-way of an existing public street; 2. The portion of a flag lot constituting the access corridor lying between the front property line and the frontage line of the corridor at the street; 3. The full width of any legal easement used for access purposes. “Nightclub” means an establishment providing alcoholic beverage service and late evening (past eleven p.m.) entertainment, with or without food service. O. “O” Definitions: “Office” means: 1. “Administrative or executive offices” including those pertaining to the management of office operations or the direction of enterprise but not including merchandising or sales services. CO N F O R M A N C E WI T H S T A T E L A W CO N F O R M A N C E WI T H S T A T E L A W RE D U N D A N T / CO N S I S T E N C Y 1263 - 32 - 2. “Medical office” means a use providing consultation, diagnosis, therapeutic, preventative or corrective personal treatment services by doctors, dentists, medical and dental laboratories, and similar practitioners of medical and healing arts for humans, licensed for such practice by the State of California and including services related to medical research, testing and analysis. 3. “Professional offices” such as those pertaining to the practice of the professions and arts including, but not limited to, accounting, architecture, dentistry, design, engineering, including associated testing and prototype development, but excluding product manufacturing and/or assembly, law and medicine, but not including sale of drugs or prescriptions except as incidental to the principal uses and where there is external evidence of such incidental use. 4. “Office district,” for purposes of the Sign Ordinance, means those buildings or groups of buildings for which the permitted uses are professional offices, is within an OA or OP zone or which are designated for offices on the general plan. “Offset” means the indentation or projection of a wall plane. “Open” means a space on the ground or on the roof of a structure, uncovered and unenclosed. “Organizational documents” means the declaration of restrictions, articles of incorporation, bylaws and any contracts for the maintenance, management or operation of all or any part of a common interest development. “Outdoor recreation use” means a privately owned or operated use providing facilities for outdoor recreation activities, including golf, tennis, swimming, riding or other outdoor sport or recreation, operated predominantly in the open, except for accessory or incidental enclosed services or facilities. P. “P” Definitions: “Park” means any open space, reservation, playground, swimming pool, golf course, recreation center, or any other area in the City owned or used by the City or County and devoted to active or passive recreations. “Parking area” means an unroofed, paved area, delineated by painted or similar markings, intended and designed to accommodate one or more vehicles. “Parking facility” means an area on a lot or within a building, or both, including one or more parking spaces, together with driveways, aisles, turning and maneuvering areas, clearances and similar features, and meeting the requirements established by this title. Parking facility includes parking lots, garages and parking structures. 1. “Temporary parking facility” means parking lots which are not required under this title and which are intended as interim improvements of property subject to removal at a later date. “Parking space” means an area on a lot or within a building, used or intended for use for parking a motor vehicle, having permanent means of access to and from a public street or alley independently of any other parking space, and located in a parking facility meeting the 1264 - 33 - requirements established by this title. Parking space is equivalent to the term “parking stall” and does not include driveways, aisles or other features comprising a parking facility as previously defined in this chapter. “Pennant” means any lightweight plastic, fabric, or other material, whether or not containing a message of any kind, suspended from a rope, wire, or string, usually in a series, designed to move in the wind. “Permit” means a permit issued by the City Council, Planning Commission, Design Review Committee, Director of Community Development, or any other decision body as empowered by the Cupertino Municipal Code, approving architecture, site improvements, buildings, structures, land and/or uses. Permits may include but shall not be limited to Administrative Approvals, Two-story Permits, Minor Residential Permits, Architectural and Site Approvals, Development Permits, Conditional Use Permits, Exceptions, Variances or Subdivision Maps. “Person” means an individual, group, partnership, firm, association, corporation, trust, governmental agency, governmental official, administrative body, or tribunal or any other form of business or legal entity. “Personal fitness training center” means a facility providing space and equipment, with or without supervision, for group or individual athletic development, increased skill development in sports activity, or rehabilitative therapy for athletic injury. “Perspective drawing” means a rendering of a three-dimensional view depicting the height, width, depth, and position of a proposed structure in relation to surrounding properties and structures when viewed from street level. “Picnic area” means a facility providing tables and cooking devices for preparation and consumption of meals out of doors or within an unenclosed shelter structure. “Practice range” means a facility providing controlled access to fixed or movable objects which are used to test and measure accuracy of discharge from a weapon. “Private educational facility” means a privately owned school, including schools owned and operated by religious organizations, offering instruction in the several branches of learning and study required to be taught in the public schools by the Education Code of the State of California. “Project improvements” means all public road improvements, undergrounding utility improvements, and improvements to the on-site utility networks as required by the City of Cupertino for a common interest development. “Projection” means architectural elements, not part of the main building support, that cantilevers from a single building wall or roof, involving no supports to the ground other than the one building wall from which the element projects. “Promotional Device” means any sign, display, fixture, placard, vehicle or structure that uses color, form, graphic, symbol, illumination or writing to advertise a special event or the opening of a new business. 1265 - 34 - “Property” means real property which includes land, that which is affixed to the land, and that which is incidental or appurtenant to the land as defined in Civil Code Sections 658 through 662. 1. Property, Adjoining. “Adjoining property” means any unit of real property, excluding lands used as public streets, sharing one or more common points with another property. “Provider” means a person who operates a child day care home and is licensed by the State of California. “Public dancehall” is a building or portion used for dancing purposes to and in which the general public is admitted and permitted to dance, upon payment of any fee other than compensation, or upon payment of a charge for admission, or for which tickets or other devices are sold, or in which a charge is made for the privilege of dancing with any other person employed for such purpose by the operator of the establishment, including but not limited to taxi dances, but excluding restaurants, hotel rooms and nightclubs in which the dancing is incidental only to other entertainment. Q. “Q” Definitions: “Qualified applicant” is a person who has a legal or equitable interest in real property which is the subject of a development agreement, determined pursuant to Section 19.116.070. Qualified applicant includes an authorized agent. “Qualifying resident,” for purposes of Chapter 19.56, Density Bonus, of this Code, means a senior citizen or other persons eligible to reside in a senior citizen housing development. R. “R” Definitions: “Recreational open space” means open space within a common interest development (exclusive of required front setback areas) which shall be used exclusively for leisure and recreational purposes, for the use and enjoyment of occupants (and their visitors) of units on the project and to which such occupants (and their visitors) have the right of use and enjoyment. Accessory structures such as swimming pools, recreational buildings and landscaped areas may be included as open space. “Recyclable materials” means discards or waste materials that may be separated or mixed, collected and processed, and used as raw materials for new products. For purposes of this chapter, recyclable material does not include hazardous materials. “Recycling center” means a facility for the collection and/or processing of recyclable materials. Recycling center does not include storage containers or processing activity located on the premises of a commercial or manufacturing use and use solely for the recycling of material generated by that business or manufacturer. 1. “Recycling center, Certified” or “Certified Processor” means a recycling facility certified by the California Department of Conservation as meeting the requirements of the California Beverage Container Recycling and Litter Reduction Act of 1986. 2. “Recycling center, Mobile” means an automobile, truck, trailer or van licensed by the Department of Motor Vehicles, which is used for the collection of recyclable material. A CO N F O R M AN C E WI T H S T A T E L AW 1266 - 35 - mobile recycling center also means the bins, boxes or containers transported by trucks, vans, or trailers and used for the collection of recyclable materials. A mobile recycling center may consist of an enclosed vehicle such as box cab or enclosed semi-trailer or an open vehicle such as a flatbed trailer with bins or boxes to contain recyclable materials. “Recycling facilities” may include the following: 1. a. “Collection facility” means a facility for the acceptance (donation, redemption or sale) of recyclable materials from the public. Such a facility does not use power-driven processing equipment except as indicated in standards and conditions, in this cChapter 19.108, Beverage Container Redemption and Recycling Centers. Collection facilities may include the following: a. i. Reverse vending machine(s); b. ii. Small collection facilities which occupy an area of not more than five hundred square feet, and may include: i. (A) A mobile recycling unit, ii. (B) Bulk reverse vending machine or a grouping of reverse vending machines occupying more than fifty square feet, iii. (C) Kiosk type units and bulk vending machines, iv. (D) Unattended containers placed for the donation of recyclable materials; c. iii. Large collection facilities which may occupy an area of more than five hundred square feet, or is on a separate property not appurtenant to a host use, and may include permanent structures. 2. b. “Processing facility” means a building or enclosed space use for the collection and processing of recyclable materials. Processing means the preparation of material for efficient shipment or to an end-user’s specifications, by such means as baling, briquetting, compacting, flattening, grinding, crushing, mechanical sorting, shredding, cleaning, and remanufacturing. Processing facility includes the following: a. i. A light processing facility occupies an area of under forty-five thousand square feet of gross collection, processing and storage area and has up to two outbound truck shipments per day. Light processing facilities are limited to baling, briquetting, crushing, compacting, grinding, shredding and sorting of source-separated recyclable materials and repairing of reusable materials sufficient to qualify as a certified processing facility. A light processing facility shall not shred, compact, or bale ferrous metals other than food and beverage containers. b. ii. A heavy processing facility is any processing facility other than a light processing facility. “Religious institution” means a seminary, retreat, monastery, conference center, or similar use for the conduct of religious activities including accessory housing incidental thereto, but excluding a private educational facility. Any use for which a property tax exemption has been obtained pursuant to Section 3(f) of Article XIII of the Constitution of the State of California and Section 206 of the Revenue and Taxation Code of the State of California, or successor legislation, RE F O R M A T T I N G RE F O R M A T T I N G 1267 - 36 - or which is used in connection with any church which has received such an exemption, shall be prima facie presumed to be a religious institution. “Research and development” means a use engaged in study, design, analysis and experimental development of products, processes or services, including incidental manufacturing of products or provisions of services to others. “Residential care facility” means a building or portion designed or used for the purpose of providing twenty-four-hour-a-day nonmedical residential living accommodations pursuant to the Uniform Building, Housing and Fire Codes, in exchange for payment of money or other consideration, where the duration of tenancy is determined, in whole or in part, by the individual resident’s participation in group or individual activities such as counseling, recovery planning, medical or therapeutic assistance. Residential care facility includes, but is not limited to, health facilities as defined in California Health and Safety Code (H&SC) Section 1250 et seq.), community care facilities (H&SC Section 1500 et seq.), residential care facilities for the elderly (H&SC Section 1569 et seq.) or facilities for the mentally disordered or otherwise handicapped (W&I Code Section 5000 et seq.), and alcoholism or drug abuse recovery or treatment facilities (H&SC Section 11384.11), and other similar care facilities. “Residential district,” for purposes of the Sign Ordinance, means the R1, RHS, R2, R3, R1C, A, and A1 zoning classifications which are consistent with the residential designation of the Cupertino general plan. Restaurant: 1. Restaurant, Fast-Food. “Fast-food restaurant” means a retail food service establishment in which prepared foods or beverages are served or sold on or in disposable containers, including those establishments where a substantial portion of the patrons may serve themselves and may consume the food and beverages off-site. A separate bar facility for serving alcoholic beverages is not permitted. Any area, tables or rooms reserved for serving alcoholic beverages shall be considered a separate bar facility. Specialty food stores, such as ice cream stores, bakeries or shops, shall not be considered fast-food restaurants. 2. Restaurant, Full Service. “Full-service restaurant” means any restaurant which is not a fast- food restaurant. Alcoholic beverages may be served with meals at a customer’s dining table; however, a separate bar facility for serving alcoholic beverages is not permitted without a use permit. “Research and development” means a use engaged in study, design, analysis and experimental development of products, processes or services, including incidental manufacturing of products or provisions of services to others. “Residential care home” means the use of a dwelling unit or portion licensed by the State of California or County of Santa Clara, for care of up to six persons, including overnight occupancy or care for extended time periods, and including all uses defined in Sections 5115 and 5116 of the California Welfare and Institutions Code, or successor legislation. MO V E D F R O M BE L O W CO N F O R M A N C E WI T H S T A T E L A W MO V E D F R O M BE L O W MOVED UP RE D U N D A N C Y 1268 - 37 - “Residential district,” for purposes of the Sign Ordinance, means the R1, RHS, R2, R3, R1C, A, and A1 zoning classifications which are consistent with the residential designation of the Cupertino general plan. “Reverse vending machine(s)” means an automated mechanical device which accepts one or more types of empty beverage containers, including, but not limited to aluminum cans, glass and plastic bottles, and issues a cash refund or a redeemable credit slip with a value not less than the containers redemption value, as determined by the State. A reverse vending machine may sort and process containers mechanically provided that the entire process is enclosed within the machine. In order to accept and temporarily store all three container types in a proportion commensurate with their relative redemption rates, and to meet the requirements of certification as a recycling center, multiple grouping of reverse vending machines may be necessary. 1. A bulk reverse vending machine is a reverse vending machine that is larger than fifty square feet; is designed to accept more than one container at a time; and will pay by weight instead of by container. “Rotating homeless shelter” means a shelter located in an existing church structure, the shelter provided not to exceed two months in any twelve-month period at any single location, and the number of occupants not to exceed twenty-five, hours of operation not to exceed six p.m. to seven a.m. S. “S” Definitions: “Screened” means shielded, concealed, and effectively hidden from view at an elevation of up to eight feet above ground level on adjoining parcels, or from adjoining parcels, within ten feet of a lot line, by a fence, wall, hedge, berm, or similar structure, architectural or landscape feature, or combination thereof. “Second dwelling unit” means an attached or a detached residential dwelling unit which provides complete independent living facilities for one or more persons. It shall include permanent provisions for living, sleeping, eating, cooking and sanitation on the same parcel as the single-family dwelling is situated. “Senior citizens” means: 1. Persons at least sixty-two years of age; or 2. Persons at least fifty-five years of age in a senior citizen housing development, in accordance with State and federal law. “Senior citizen housing development” means a housing development with at least thirty-five dwelling units as defined in the Civil Code Section 51.3, or a mobilehome park that limits residency based on age requirements for housing for older persons pursuant to Section 798.76 or 799.5 of the Civil Code, as may be amended. : 1. Government subsidized housing units for senior citizens; 2. Housing intended for, and solely occupied by, persons at least sixty-two years of age; or CO N F O R M A N C E WI T H S T A T E L A W MOVED UP DU P L I C A T I O N 1269 - 38 - 3. Housing consisting of at least one hundred fifty units in which eighty percent of the units have at least one person aged fifty-five or older and which provide special facilities and services designed for seniors. Eligibility for a density bonus or other concession for senior citizen units must be in conformity with State and federal laws governing senior housing projects. “Setback line” means a line within a lot parallel to a corresponding lot line, which is the boundary of any specified front, side or rear yard, or the boundary of any public right-of-way or private road, whether acquired in fee, easement, or otherwise, or a line otherwise established to govern the location of buildings, structures or uses. Where no minimum front, side or rear yards are specified, the setback line shall be coterminous with the corresponding lot line. Setback Area, Required. “Required setback area” means open space, unoccupied and unobstructed from the ground upward, except as provided in this title, between the lot line and the setback line on the same parcel. 1. Setback Area, Required Front Yard. “Required front-yard setback area” means the setback area extending across the front of a lot between the front lot line and the setback line. Front yards shall be measured either by a line at right angles to the front lot line, or by a radial line in the case of a curved front lot line, except flag lots which is the area extending across the full extent of the buildable portion of the flag lot measured from the property line which is parallel to and nearest the street line and at which point the lot width equals a minimum of sixty feet. The Director of Community Development shall have the discretion to modify the provisions of this definition when it improves the design relationship of the proposed buildings to adjacent buildings or parcels. 2. Setback Area, Required Rear Yard. “Required rear-yard setback area” means the area extending across the full width of the lot between the rear lot line and the nearest line or point of the main building. 3. Setback Area, Required Side Yard. “Required side-yard setback area” means the area between the side lot line and the nearest line of a building, and extending from the front setback line to the rear setback line. “Shopping center” means a group of commercial establishments, planned, developed, owned or managed as a unit, with off-street parking provided on the parcel. “Shopping center,” for purposes of the Sign Ordinance, means a retail entity encompassing three or more tenants within a single building or group of buildings, but within which individual business located in defined tenant spaces are owned and managed separately from the shopping center management. “Sidewalk site triangle” is a triangular shaped area described in Cupertino Standard Detail 7-6. (See Appendix C, Cupertino Standard Detail; Sidewalk Site Triangle (Sidewalk Clearance at Driveway) “Sign” means any device, fixture, placard, or structure that uses any color, form, graphic, illumination, symbol, or writing to advertise, announce the purpose of, or identify the purpose of a person or entity, to communicate information of any kind to the public. MOVED TO CHAPTER 19.56 1270 - 39 - 1. “Animated sign” means any sign which projects action, motion or the illusion thereof, changes intensity of illumination or changes colors, including the likes of balloons, banners and flags, and blowing or air-powered attractions, but excluding electronic readerboard signs and signs that display the current time or temperature. 2. “Blade sign” means a pedestrian oriented sign, adjacent to a pedestrian walkway or sidewalk, attached to a building wall, marquee, awning or arcade with the exposed face of the sign in a plane perpendicular to the plane of the building wall. 3. “Development Identification Sign” means a ground sign at the major entry to a residential development with twenty units or more meant to identify the name and address of the development. 4. “Directional sign” means any sign which primarily displays directions to a particular area, location or site. 5. “Directory sign” means any outdoor listing of occupants of a building or group of buildings. 6. “Electronic readerboard sign” means an electronic sign intended for a periodically-changing advertising message. 7. “Freeway oriented sign” means any sign which is located within six hundred sixty feet and visible from a freeway right-of-way as defined by Section 5200 of the California Business and Professions Code. 8. “Garage sale signs” means any sign used for advertising a garage or patio sale as defined in Chapter 5.16 of the Cupertino Municipal Code. 9. “Ground sign” means any sign permanently affixed to the ground and not supported by a building structure. The height of thesign shall be measured from the grade of the adjoining closest sidewalk to the top of the sign including trim. 10. “Identification sign” means any sign whose sole purpose is to display the name of the site and the names of the occupants, their products or their services. 11. “Illegal sign” means any sign or advertising statuary which was not lawfully erected, maintained, or was not in conformance with the provisions of this title in effect at the time of the erection of the sign or advertising statuary or which was not installed with a valid permit from the City. 12. “Illuminated sign” means any sign utilizing an artificial source of light to enhance its visibility. 13. “Informational sign” means any sign which promotes no products or services, but displays service or general information to the public, including the likes of hours of operation, rest room identifications and hazardous warnings. 14. “Landmark sign” means an existing, legal non-conforming ground sign that has a distinctive architectural style. 15. “Nonconforming sign” means any sign or advertising statuary that was legally erected and had obtained a valid permit in conformance with the ordinance in effect at the time of the erection of the sign but which became nonconforming due to the adoption of the ordinance codified in this title. 1271 - 40 - 16. “Obsolete sign” means any sign that displays incorrect or misleading information, promotes products or services no longer available at that site or identifies departed occupants. 17. “Off-site sign” means any sign not located on the premises of the business or entity indicated or advertised by the sign. This definition shall include billboards, poster panels, painted bulletins and other similar advertising displays. 18. “On-site sign” means a sign directing attention to a business, commodity, service or entertainment conducted, sold or offered upon the same premises as those upon which the sign is maintained. 19. “Political sign” means a temporary sign that encourages a particular vote in a scheduled election and is posted prior to the scheduled election. 20. “Portable Sign or Display” means any outdoor sign or display not permanently attached to the ground or a structure on the premises it is intended to occupy and displayed only during business hours. Portable sign or display includes A-frames, flower carts, statues, and other similar devices used for advertising as determined by the Director. 21. “Project announcement sign” means any temporary sign that displays information pertinent to a current or future site of construction, including the likes of the project name, developers, owners and operators, completion dates, availability and occupants. 22. “Projecting sign” means any sign other than a wall sign that is attached to and projects from a structure or building face or wall. 23. “Real estate sign” means a temporary sign indicating that a particular premises is for sale, lease or rent. 24. “Roof sign” means a sign erected between the lowest and highest points of a roof. 25. “Street address sign” means any sign that displays only the street address number(s) of the site and, at the option of the property owner, the street name. 26. “Temporary Sign” means any sign, display, banner or promotional device which is designed or intended to be displayed only during the allowable business hours or for short periods of time as specified by the Director of Community Development. 27. “V-shaped signs” means any sign consisting of two vertical faces, or essentially vertical faces, with one common edge and which appears as the letter V when viewed directly from above. 28. “Vehicle sign” means a sign painted on or attached to an operable or movable vehicle; in the case of motor vehicles, “operable” shall be defined as having a valid license plate. 29. “Wall sign” means any sign that is attached, erected or painted on a structure attached to a building, a canopy structure, or the exterior wall of a building with the exposed face of the sign parallel to the wall. 30. “Window sign” means any sign that is intended to be read from outside of the structure or painted on a window facing a public street, parking lot, pedestrian plaza or walkway accessible to the public. . “Sign Area” for an individually lettered sign without a background, is measured by enclosing the sign copy with a continuous perimeter in simple rectilinear forms. (See Appendix D for examples of sign area calculation) 1272 - 41 - The sign area for a sign with borders and/or background is measured by enclosing the exterior limits of the border or background with a single continuous perimeter. The necessary supports, uprights, and/ or the base on which such sign is placed, shall be excluded from the sign area. When a sign is separated by thirty-six inches or more, the area of each part may be computed separately. “Single-family use” means the use of a parcel for only one dwelling unit. “Specialty food stores” means uses such as bakeries, donut shops, ice cream stores, produce markets and meat markets, or similar establishments where food is prepared and/or sold primarily for consumption off the premises. “Site,” for purposes of the Sign Ordinance, means a piece of land as shown on a subdivision map, record of survey map or assessor’s parcel map, which constitutes one development site and which may be composed of a single unit of land or contiguous units under common ownership, control, or development agreement. “Special event,” for purposes of the Sign Ordinance means a temporary promotional event including, but not limited to, a special sale on merchandise or services, or grand openings. “Special Event Banner” means any temporary sign constructed of pliable materials such as canvas, fabric, vinyl plastic or similar materials which will withstand exposure to wind and rain without significant deterioration, and which does not require a building permit for its construction, or installation outside of a building. “Specified anatomical areas” means: 1. Less than completely and opaquely covered human genitals, pubic region, buttocks and female breast below a point immediately above the top of the areola; and 2. Human male genitals in a discernibly turgid state, even if completely and opaquely covered. “Specified sexual activities” means: 1. Human genitals in a state of sexual stimulation or arousal; 2. Acts of human masturbation, sexual intercourse or sodomy; 3. Fondling or other erotic touching of human genitals, pubic region, buttocks or female breast. “Story” means that portion of a building, excluding a basement, between the surface of any floor and the surface of the next floor above it, or if there is no floor above it, then the space between the floor and the ceiling next above it. “Street” means a public or private thoroughfare the design of which has been approved by the City which affords the principal means of access to abutting property, including avenue, place, way, drive, lane, boulevard, highway, road, and any other thoroughfare except an alley as defined in this chapter. 1. Street, Public. “Public street” means all streets, highways, lanes, places, avenues and portions and including extensions in the length and width, which have been dedicated by the owners to public use, acquired for public use, or in which a public easement for roadway purposes exists. 1273 - 42 - “Street frontage,” for purposes of the Sign Ordinance, means the length of a site along or fronting on a public or private street, driveway or other principal thoroughfare, but does not include such length along an alley, watercourse, railroad right-of-way or limited access roadway or freeway. “Structure” means that which is built or constructed, an edifice or building of any kind, or any piece of work artificially built up or composed of parts joined together in some definite manner. 1. Structure, Recreational. “Recreational structure” means any affixed accessory structure or portion, which functions for play, recreation or exercise (e.g., pool slides, playhouses, tree houses, swings, climbing apparatus, gazebos, decks, patios, hot tubs and pools) but does not include portable play structures, such as swings or climbing apparatus. “Structurally attached” means any structure or accessory structure or portion thereof, which is substantially attached or connected by a roof structure or similar physical attachment. “Supportive housing” (per CA Health and Safety Code 50675.14(b)(1)Government Code Section 65582(f), as may be amended) means housing with no limit on length of stay, that is occupied by the target population, and that is linked to onsite or offsite services that assist the supportive housing resident in retaining the housing, improving his or her health status, and maximizing his or her ability to live and, when possible, work in the community. T. “T” Definitions: “Target population” (per CA Health and Safety Code 50675.14(b)(2)Government Code Section 65582(g), as may be amended) means persons with low incomes having one or more disabilities, including mental illness, HIV or AIDS, substance abuse, or other chronic health conditions, or individuals eligible for services provided under the Lanterman Developmental Disabilities Services Act (Division 4.5 (commencing with Section 4500) of the Welfare and Institutions Code) and may, among other populations, emancipated youth, families with children, elderly persons, young adults aging out of the foster care system, individuals exiting from institutional settings, veterans, or homeless people. “Transient” means any individual who exercises occupancy or is entitled to occupancy by reason of concession, permit, right of access, license or other agreement for a period of thirty consecutive calendar days or less, counting portions of calendar days as full days, and including any individual who actually physically occupies the premises, by permission of any other person entitled to occupancy. “Transitional housing” and “transitional housing development” (per CA Health and Safety Code 50675.2 (h)Government Code Section 65582(h), as may be amended) means buildings configured as rental housing developments, but operated under program requirements that call for the termination of assistance and recirculation of the assisted unit to another eligible program recipient at some predetermined future point in time, which shall be no less than six months from the beginning of assistance. “Trim” means the molding, battens, cappings, nailing strips, lattice and platforms which are attached to a sign. CO N F O R M A N C E WI T H S T A T E L A W CO N F O R M A N C E WI T H S T A T E L A W 1274 - 43 - U. “U” Definitions: “Use” means the conduct of an activity, or the performance of a function or operation, on a parcel or in a building or facility. 1. “Accessory use” means a use which is incidental to and customarily associated with a specified principal use. 2. “Conditional use” me ans a use listed by the regulations of any particular district as a conditional use within that district, and allowable solely on a discretionary or conditional basis, subject to issuance of a conditional use permit, and to all other regulations established by this title. 3. “Nonconforming use” means a use which is not a permitted use or conditional use authorized within the district in which it is located, but which was lawfully existing on October 10, 1955; or the date of any amendments thereto, or the application of any district to the property involved, by reason of which adoption or application the use became nonconforming. (See “noncomplying facilities” in this chapter for a definition.) 4. “Permitted use” means a use listed by the regulations of any particular district as a permitted use within that district, and permitted therein as a matter of right when conducted in accord with the regulations established by this title. 5. “Principal use” means a use which fulfills a primary function of a household, establishment, institution, or other entity. “Useable rear yard” means that area bounded by the rear lot line(s) and the rear building line extended to the side lot lines. The side yard adjacent to a proposed minor addition (e.g., addition equaling ten percent or less of the principal structure) may be included in calculation of usable rear yard area. V. “V” Definitions: “Variance application” means an application for which an exception process is not identified in the Municipal Code. “Vehicle” means any boat, bus, trailer, motor home, van, camper (whether or not attached to a pickup truck or other vehicle), mobilehome, motorcycle, automobile, truck, pickup, airplane, boat trailer, truck tractor, truck trailer, utility trailer or recreational vehicle, or parts, or any device by which any person or property may be propelled, moved or drawn upon a public street, excepting a device moved exclusively by human power. 1. Vehicle, commercial. “Commercial vehicle” means a vehicle of a type required to be registered under the California Vehicle Code used or maintained for the transportation of persons for hire, compensation, or profit or designed, used, or maintained primarily for the transportation of goods. 2. Vehicle, Recreation. “Recreation vehicle” means a vehicle towed or self-propelled on its own chassis or attached to the chassis of another vehicle and designed or used for temporary dwelling, recreational or sporting purposes. The term recreation vehicle includes, but is not 1275 - 44 - limited to, trailers, motor coach homes, converted trucks and buses, and boats and boat trailers. “Very low income household” means a household whose gross income is as does not exceed that established by Health and Safety Code Section 50105, as may be amended. “Visual privacy intrusion” means uninterrupted visual access from a residential dwelling or structure into the interior or exterior areas of adjacent residential structures, which area is either completely or partially private, designed for the sole use of the occupant, and/or which serves to fulfill the interior and/or exterior privacy needs of the impacted residence or residences. W. “W” Definitions: None. X. “X” Definitions: None. Y. “Y” Definitions: “Yard” means an area within a lot, adjoining a lot line, and measured horizontally, and perpendicular to the lot line for a specified distance, open and unobstructed except for activities and facilities allowed therein by this title. 1. “Front yard” means a yard measured into a lot from the front lot line, extending the full width of the lot between the side lot lines intersecting the front lot line. 2. “Rear yard” means a yard measured into a lot from the rear lot line, extending between the side yards; provided that for lots having no defined rear lot line, the rear yard shall be measured into the lot from the rearmost point of the lot depth to a line parallel to the front lot line. 3. “Side yard” means a yard measured into a lot from a side lot line, extending between the front yard and rear lot line. Z. “Z” Definitions: None. CO N F O R M A N C E WI T H S T A T E L A W 1276 - 45 - CHAPTER 19.12 – ADMINISTRATION Section 19.12.010 Purpose and intent. 19.12.020 Applicability of Regulations. 19.12.030 Approval Authority 19.12.040 Authority of the Director of Community Development. 19.12.050 Authority of the Design Review Committee. 19.12.060 Authority of the Planning Commission. 19.12.070 Authority of the City Council. 19.12.080 Application Process 19.12.090 Action by Director. 19.12.100 Decision 19.12.110 Noticing. 19.12.120 Action by Director of Community Development — Administrative. 19.12.130 Action by Design Review Committee and Planning Commission. 19.12.140 Action by City Council. 19.12.150 Notice of Decision and Reports. 19.12.160 Effective date. 19.12.170 Appeals 19.12.180 Expiration, Extension and Revocation. 19.12.010 Purpose and intent. The purpose and intent of the Administration section is to establish procedures for the discretionary review of development in the city in order to ensure that new development and changes to existing developments comply with city development requirements and policies. This chapter establishes the procedures for review of applications before the approval authorities for each type of project and the process for appeals of any requirement, decision or determination made by any Approval Body. 19.12.020 Applicability of Regulations. Except as otherwise provided in this section, Development Review is required for all zoning map and text amendments, new construction, modifications to building exteriors or site improvements, and changes in Land Use, including, but not limited to, the following: A. In the A, A1, R1 and RHS Zones, the following activities: 1277 - 46 - 1. Conditional uses in accord with Chapter 19.20, Chapter 19.24, Chapter 19.28, Chapter, 19.32, Chapter 19.36, Chapter 19.40 and Chapter 19.44; 2. Removal of protected trees identified in Chapter 14.18; 3. Projects in R1 zones identified in Section 19.28.040; 4. Height Exceptions identified in Section 19.24.070(B)(3); 5. Hillside Exceptions identified in Section 19.44.070 and Chapter 19.48; 6. Parking Exceptions identified in Chapter 19.124; 7. Fence Exceptions identified in Chapter 19.48 8. Variance to all other zoning regulations B. In R2, R3, R1C and all Commercial, Industrial, Office, Planned Community Districts and other non-residential zoning districts: 1. New structures or property development, including signs and sign programs. 2. Building additions, exterior modifications to existing structures including signs and sign programs, and site changes (including, but not limited to, new or modified landscaping, tree removals, fencing, changes to parking lot space striping or circulation); 3. Changes in property or building use that involve exterior modifications; 4. Exceptions or modifications to the development's required and/or existing parking; 5. Conditional uses in accord with Chapter 19.60, Chapter 19.64, Chapter 19.68, Chapter 19.72, Chapter 19.76, Chapter 19.80, Chapter 19.84, Chapter 19.88, Chapter 19.92, Chapter 19.96, Chapter 19., Chapter 19.128, Chapter 19.116, Chapter 19.132, Chapter 19.136; 19.12.030 Approval Authority Table 19.12.030 shows the approval authority, Noticing Radius, Expiration Date and Extension Dates for different types of Permits. 1278 - 47 - Table 19.12.030: Approval Authority Type of Permit or Decision A, B Administrative Review Design Review Committee Planning Commission City Council Public Hearing/ Public Meeting/ Comment Period C Noticing/ Noticing Radius D Posted Site Notice Expiration Date E Chapter/ Findings General Plan Amendment Major F - - R F PH CA. Govt. Code 65350- 65362300’ 300’ Yes - CA. Govt. Code 65350- 65362 Minor G - - R F PH Yes - Zoning Map Amendments Major F - - R F PH 300’ CA. Govt. Code 65853 - 65856 300’ Yes - 19.152.020 Minor G - - R F PH Yes - Zoning Text Amendments - - R F PH CA. Govt. Code 65853 - 65856 300’ - - 19.152.030 Specific Plans - - R F PH CA. Govt. Code 65350- 65362 300’ - - 20.04.030 Development Agreements - - R F PH CA. Govt. Code 65867 300’ Yes - 19.144.120 Development Permits Major F, H - - F/R A1/F PM 19.12.110/ Yes 2 years 1279 - 48 - Type of Permit or Decision A, B Administrative Review Design Review Committee Planning Commission City Council Public Hearing/ Public Meeting/ Comment Period C Noticing/ Noticing Radius D Posted Site Notice Expiration Date E Chapter/ Findings Minor G F - A1 A2 PM 300’ 300’ Yes 2 years 19.156.050 Conditional Use Permits Major F, H, I F - A1/F/R A1/A2/F PH 300’ 300’CA. Govt. Code 65905 Yes 2 years 19.156.050 Minor G, I F - A1/F/R A1/A2/F PH Yes 2 years Temporary F - A1 A2 - None No 1 year None 19.160.030 Density Bonus (Residential) R F Based on concurrent application 19.52 Adult-Oriented Commercial Activity (CUP) - R F PH CA. Govt. Code 65905/ 300’ Yes 2 years 19.128.030 & 19.128.040 Architectural and Site Approval Major J F - A1 A2 PM 19.12.110/ Adjacent Adjacent Yes 2 years 19.168.030 Minor K F - A1 A2 PM Yes 2 years Amendment Major F, H - - F A1 PM/PH 19.12.110/ 300’ 300’ Yes 2 years 19.44, 19.156, 19.164 Minor G F - A1 A2 PM/PH Yes 2 years Minor Modification F - A1 A2 - None No 2 years 19.164 Hillside Exception/ Height - - F A1 PH 19.12.110/ Yes 2 years 1280 - 49 - Type of Permit or Decision A, B Administrative Review Design Review Committee Planning Commission City Council Public Hearing/ Public Meeting/ Comment Period C Noticing/ Noticing Radius D Posted Site Notice Expiration Date E Chapter/ Findings Exception / Heart of the City Exception I 300’ 19.40.080, 19.24.070, 19.136.090 Variance F - A1 A2 PH CA. Govt. Code 65905300’ Yes 2 years 19.156.060 Status of non-conforming Use - - F A1 PH 19.12.110/ 300’ Yes - 19.140.110 Wireless Antennas I F - F/ A1 A2 Varies I Depends on application type 300’ Yes 2 years 19.136.090 Signs Permits F - A1 A2 - None No 1 year 19.104 Neon, Reader board & Freeway Oriented Signs I - F F A1 L PM 19.12.110/ 300’ No 1 year 19.104 Programs F - A1 A2 - None No 1 year 19.104 Exceptions I - F - A1 L PM 19.12.110/ Adjacent Yes 1 year 19.104.290 Parking Exceptions I F F A1 A1 L /A2 Varies M 19.12.110/ Adjacent/ 300’ N Yes 1 year 19.124.050 Fence Exceptions - F - A1 L PM 19.12.110/ Adjacent Yes 1 year 19.48.060 Front Yard Interpretation F - A1 A2 PM 19.12.110/ Yes 1 year 19.08 1281 - 50 - Type of Permit or Decision A, B Administrative Review Design Review Committee Planning Commission City Council Public Hearing/ Public Meeting/ Comment Period C Noticing/ Noticing Radius D Posted Site Notice Expiration Date E Chapter/ Findings Adjacent R1 Ordinance Permits Two-story I F F F/A1 A1 L /A2 Varies I 19.12.110/ Adjacent Adjacent Adjacent Yes 1 year 19.28.140 Minor Residential F - A1 A2 CP No 1 year Exceptions I - F - A1 L PM Yes 1 year Protected Trees Tree Removal F - A1 A2 CP Adjacent/ Depending on type of application Yes 1 year 14.18.180 Heritage Tree Designation & Removal - - F A1 PM 19.12.110/ 300’ Yes - 14.18 Tree Management Plan F - A1 A2 - None No - 14.18 Retroactive Tree Removal F - A1 A2 - None No - 14.18 Reasonable Accommodation F - A1 A2 - None No 1 year 19.52.050 Extensions O Parking, Fence & Sign Exceptions & Front Yard Interpretations F - A1 A2 - None No 1 year Neon, Reader board & Freeway Oriented Signs F A1 A2 - None No 1 year Two Story Permits, Minor Residential Permits and Exceptions F A1 A2 - None No 1 year 1282 - 51 - Type of Permit or Decision A, B Administrative Review Design Review Committee Planning Commission City Council Public Hearing/ Public Meeting/ Comment Period C Noticing/ Noticing Radius D Posted Site Notice Expiration Date E Chapter/ Findings Tree Removals F - A1 A2 - - No 1 year All other projects F - A1 A2 - 19.12.110/ None No 2 years 19.12 Key: R—Review and recommendation body F — Final decision-making body unless appealed A1 —Appeal Body on first appeal A2 — Appeal body on second appeal PH – Public Hearing PM – Public Meeting CP – Comment Period 1283 - 52 - Notes: A. Permits can be processed concurrently with other applications, at the discretion of the Director of Community Development. B. Projects with combined applications shall be processed at the highest level of approval in conformance with Section 19.04.090. C. Public Hearing: Projects types that need noticing pursuant to the CA Government Code; Public Meeting: Project types that need only a mailed notice and no newspaper notices; Comment Period: Project types that need only a mailed notice and do not need a public hearing or public meeting. D. Noticing Radius of an application in a combined application shall correspond to the maximum noticing radius required for any one of the applications. E. Expiration date of an application in a combined application shall correspond to the maximum expiration date allowed for any one of the development applications (not including Subdivision Map Act applications, General Plan Amendments and Zoning Map or Text Amendments.) F. Major General Plan Amendment, Conditional Use Permit, Development Permit application - for more than ten thousand square feet of commercial and/or industrial and/or office and/or other non-residential use, or greater than six residential units G. Minor General Plan Amendment, Conditional Use Permit, Development Permit application - for ten thousand square feet or less of commercial and/or industrial and/or office and/or other non-residential use, or six or less residential units. H. City Council review for applications with new development greater than fifty thousand square feet of commercial, and/or greater than one hundred thousand square feet of industrial and/or office and/or other non-residential use, and/or greater than fifty residential units. Planning Commission review for all other applications. I. Please see specific zoning district regulations or chapters in this title that apply to the subject property or project for approval authority. J. Major Architectural and Site Approval application - architectural and site approval for all projects that are not a Minor Architectural and Site Approval application. K. Minor Architectural and Site Approval application - single family home in a planned development zoning district, minor building architectural modifications, landscaping, signs and lighting for new development, redevelopment or modification in such zones where review is required and minor modifications of duplex and multi-family buildings. L. Appeals of Design Review Committee decisions shall be heard by the City Council. M. Parking Exceptions approved by the Director of Community Development need a comment period. Parking Exceptions approved by the Design Review Committee need a public meeting. N. Parking Exceptions in Single-family residential (R1) zones and Duplex (R2) zones need adjacent noticing. All other Parking Exceptions need notices within three hundred feet of the exterior boundary of the subject property. O. Application must be filed prior to expiration date of permit. Permit is extended until decision of the Approval Body on the one-time extension. CL A R I F I C A T I O N 1284 - 53 - 19.12.040 Authority of the Director of Community Development. Subject to the provisions of this chapter and general purpose and intent of this title, the authority of the Director of Community Development is as follows: A. Grant any permits which are authorized to be issued by the Director pursuant to Section 19.12.030 and any other provisions of this code; B. Grant parking exceptions for projects that are reviewed in conjunction with permits which are authorized to be issued by the Director of Community Development pursuant to Section 19.12.030; C. Grant a variance from site development regulations and parking and loading regulations (except those handicapped parking regulations mandated by State law) applicable within any zoning district established by this title; D. Grant a variance from the special conditions of approval that apply to site development and parking and loading regulations (including conditions attached to planned developments) applicable within any zoning district established by this title. E. Grant a request for reasonable accommodation made by any person with a disability, when the strict application of the provisions within residential districts acts as a barrier to fair housing opportunities, pursuant to Chapter 19.52. F. Make reasonable interpretations of the regulations and provisions of this title, and any chapter therein, consistent with the legislative intent. Persons aggrieved by an interpretation of the Director of Community Development may petition the Planning Commission in writing for review of the interpretation. G. May refer an application to another Approval Body for review, decision or recommendation. 19.12.050 Authority of the Design Review Committee. Subject to the provisions of this chapter and general purpose and intent of this title, the authority of the Design Review Committee is as follows: A. Grant any permits and exceptions which are authorized to be issued by the Design Review Committee pursuant to Section 19.12.030 and any other provisions of this code; B. Grant parking exceptions for projects that are in conjunction with permits which are authorized to be issued by the Design Review Committee pursuant to Section 19.12.030. 19.12.060 Authority of the Planning Commission. Subject to the provisions of this chapter and general purpose and intent of this title, the authority of the Planning Commission is as follows: A. Grant any permits which are authorized to be issued by the Planning Commission pursuant to Section 19.12.030 and any other provisions of this code; B. Grant parking exceptions for projects that are in conjunction with permits which are authorized to be issued by the Planning Commission pursuant to Section 19.12.030; 1285 - 54 - C. Make recommendations to the City Council on applications in which it is a recommending body; and D. Decide on appeals of decisions pursuant to Section 19.12.030. 19.12.070 Authority of the City Council. Subject to the provisions of this chapter and general purpose and intent of this title, the authority of the City Council is as follows: A. Grant any permits which are authorized to be issued by the City Council pursuant to Section 19.12.030 and any other provisions of the code; B. Decide on appeals of decisions pursuant to Section 19.12.030. 19.12.080 Application Process The following provisions outline the requirements for the filing of applications for permits, entitlements, amendments, and approvals. Unless otherwise specified in this title, all applications for permits, entitlements, amendments and approvals required by this title shall be filed in compliance with this section. Applications for permits, permit modifications, amendments and other matters pertaining to this Chapter shall be filed with the Director of Community Development with the following: A. An application for permit may be made by the owner of record, his or her agent, lessee(s) of property, or person(s) who have contracted to purchase or lease property contingent upon their ability to acquire the necessary permit under this title and who have written authorization from the property owner to make an application. B. Application shall be made on a form provided by the City, and shall contain the following, unless waived by the Director of Community Development based on the scope of the proposed project: 1. A complete legal description of the subject property and map showing the location of the property for which the permit is sought; 2. A preliminary title report of the subject property; 3. The proposed site development plan indicating: the location of all buildings and structures; the location and types of land uses; paved areas, such as roadways, driveways and walkways; and general landscaping scheme; 4. Architectural drawings of the proposed development, building additions or other structures. Drawings shall indicate building height, colors, materials, window treatment and other architectural features; 5. Maps showing the locations of buildings; 6. Renderings showing building heights and square footages; 7. Maps showing the precise location of roads, streets, alleys and access points; 8. A traffic analysis, if required; 1286 - 55 - 9. A construction plan, 10. Any property/development with a Homeowner’s Association (HOA) or Architectural Review Board (ARB) shall provide a letter of approval from said HOA Board or ARB. 11. The Director of Community Development may reasonably require additional information which is pertinent and essential to the application. 12. Zoning Map or Text Amendments shall also include information required per Chapter 19.152. a. Zoning applications for Planned Development Zoning Districts shall also include information required per Section 19.80.040; b. Zoning applications for Multi-Family (R3) Residential shall also include information required per Section 19.36.040; and c. Zoning applications for Residential Single-family Cluster (R1C) initiated by a property owner, or his or her designee, shall also include items identified in Section 19.44.050H. 13. Planned Development Permit and Development Permit applications shall also include information required per Section 19.156.010: 14. Conditional Use Permits and Variances shall also include information required per Section 19.156.020. 15. Density Bonus Permit applications shall also include information required per Section 19.56.060. 16. Conversion of Apartment Projects to Common Interest Developments applications shall also include information required per Section 19.116.050. 17. Sign Permit Applications should also include information required per Section 19.104.040. C. Application shall be accompanied by the fee prescribed by City Council resolution, no part of which shall be returnable to the applicant. 19.12.090 Action by Director. Upon receipt of an application for a permit, the Director of Community Development shall: A. Within thirty days determine whether the application is complete or needs additional information and shall inform the applicant. B. Not later than a period stipulated in Section 19.12.100, Decision, below: 1. Set a date for a public hearing or public meeting upon the matter at a regular or special meeting of the approval authority for the project for applications that require a public hearing or public meeting, or 2. Send notice in accord with the requirements of 19.12.110(D) for applications that do not need a public hearing or public meeting. 1287 - 56 - 19.12.100 Decision Unless postponed or continued with the mutual consent of the Director of Community Development and the applicant and written confirmation from the applicant, a decision shall be rendered: A. No later than sixty (60) days following the date the application is deemed complete and either categorically exempt under the California Environmental Quality Act (CEQA) or the adoption of a negative declaration or one hundred and eighty (180) days of certification of an Environmental Impact Report (EIR). B. Notwithstanding the above, no later than one hundred and fifty (150) days upon receipt of a complete application for a new personal wireless communication facility or ninety (90) days upon receipt of an application for collocation of a personal wireless communication facility/antennas. 19.12.110 Noticing. A. Notice of Public Hearing: Noticing shall be provided in the following manner forconformance with applicable California Government Code Sections, as may be amended from time to time, for applications that need a public hearing.: 1. Notice of hearing shall be given by publication once in a local newspaper of general circulation not less than ten days prior to the date of the hearing as provided in Section 65090 of the California Government Code; 2. The City shall mail written notice by first class mail to: a. Each owner of record of real property within the noticing radius per Section 19.12.030 of the exterior boundary of the property for which the application is made as the owner of record is shown in the last tax assessment roll pursuant to Section 65091 of the California Government Code; b. Owner(s) of subject site or his or her authorized agent c. Project applicant(s) d. Local agencies expected to provide water, sewage, streets, roads, schools or other essential facilities or services to the proposed project; e. Any individual or entity that has filed a written request with the City Clerk requesting notification of public hearings 3. If the number of owners to whom notice would be mailed or delivered pursuant to subsection A2 above is greater than one thousand, in lieu of mailed or delivered notice, the Director may provide published notice as provided in Government Code Section 65091(3). 4. The notice shall contain the following: a. The exact address of the property, if known, or the location of the property, if the exact address is not known; CO N F O R M T O GO V E R N M E N T CO D E 1288 - 57 - b. The date on which action on the application will be taken; c. A brief description, the content of which shall be in the sole discretion of the City, of the proposed project; d. Reference to the application on file for particulars; e. A statement that any interested person, or agent thereof, may contact the city for additional information and/or plans. Typographical and/or publishing errors shall not invalidate the notice nor any City action related to the notice. B. Notice of Public Hearing for Zoning Text Amendments: 1. For amendments to zoning regulations: Notice of such hearing (publication) shall be given in the manner prescribed in Section 19.12.110 A(1) of this chapter. 2. For amendments to permitted uses of real property: Notice (mailing or publication) shall be given pursuant to Sections 19.12.110 A(2) or A(3), as the case may be. C.B. Notice of Public Meeting: For projects requiring notice of a public meeting, notice shall be mailed provided in accord with 19.12.110A(2) or A(3)in conformance with California Government Code Section 65091, as may be amended from time to time, as follows:, as the case may be, at least ten days prior to the date of the meeting date. 1. Written notice by first class mail to: a. Each owner of record of real property within the noticing radius per Section 19.12.030 of the exterior boundary of the property for which the application is made as the owner of record is shown in the last tax assessment roll; b. Owner(s) of subject site or his or her authorized agent c. Project applicant(s) d. Any individual or entity that has filed a written request with the City Clerk requesting notification of public hearings e. Local agencies expected to provide water, sewage, streets, roads, schools or other essential facilities or services to the proposed project; 2. If the number of owners to whom notice would be mailed or delivered pursuant to subsection C1 above is greater than one thousand, in lieu of mailed or delivered notice, the Director may provide published notice as provided in Government Code Section 65091 (a)(4). 3. The notice shall contain information pursuant to Government Code Section 65094. D.C. Notice of Comment Period: For projects requiring notice of a comment period, notice shall be mailed in accord with 19.12.110A110C(12)(a)-(d) and A(5), fourteen calendar days prior to the date of action on the application. 1. For permits issued pursuant to Chapter 19.28, Single Family Residential, the mailed notice shall include a copy of the site plan and elevation plans of the proposed project. MO V E D 1289 - 58 - 2. For permits issued pursuant to Chapter 14.18, Protected Trees, the mailed notice shall include a copy of the site plan and tree replacement/mitigation plan. E.D. The City may also give notice of public hearings/public meetings in any other manner it deems necessary or desirable. If the Director of Community Development believes the project may have impacts beyond the range of the mailed notice, particularly on nearby residential areas, the Director, in his or her discretion, may expand noticing beyond the stated requirements in Section 19.12.030. Compliance with the procedures set forth in this section shall constitute a good-faith effort to provide notice, and the failure to provide notice, and the failure of any to receive notice, shall not prevent the City from proceeding with a hearing, meeting or from taking any action nor affect the validity of any action. Typographical and/or publishing errors shall not invalidate the notice nor any City action related to the notice. F.E. Posted Site Notice: 1. Applicants shall install notice(s) on the subject site that is/are clearly visible from the street in accord with the requirements of Table 19.12.030. a. Applicants must install a public notice in the front yard of the subject site. b. For all applications other than Two Story Permits, Residential Design Review and Tree Removal applications in R1 or R2 zones, if the subject site has more than one property line abutting a street, the applicant may be required to install more than one notice. 2. The notice shall be a weatherproof sign, at least 2 feet tall and 3 feet wide, firmly attached to a 5 foot tall post. 3. The notice shall be placed the same number of days at least 14 days prior to the decision/public hearing as required for the public hearing or mailed notices per Section 19.12.110 A – C and shall remain in place until an action has been taken on the application and the appeal period has passed. 4. The notice shall contain the following: a. The exact address of the property, if known, or the general location of the property, if the address is not knownby text or diagram; b. A brief general description of the proposed project, the content of which shall be at the sole discretion of the City; c. City contact information for public inquiries; d. A deadline for the submission of public comments; e. If proposing a physical alteration to an existing building or new buildings, at least one of the following visual representations of the proposed project: IN T E R N A L CO N S I S T E N C Y MO V E D 1290 - 59 - i. A color perspective drawing or three-dimensional (3-D) photographic simulation of the proposed project, in a size deemed appropriate by the Director of Community Development. ii. For Two Story Permits and Residential Design Review applications, a color or black and white perspective drawing or three-dimensional (3-D) photographic simulation of the proposed project, at least 11 inches by 17 inches in size. iii. Visual Representation is not required for applications that do not have a material change in the physical appearance of the property. 19.12.120 Action by Director of Community Development — Administrative. A. For applications requiring Administrative approval with a public meeting, public hearing or comment period, the Director of Community Development or his or her designee may, subject to the requirements of Section 19.12.100, Decision: 1. Issue his or her decision at the conclusion of the public meeting, public hearing or comment period; 2. Continue the item for additional public hearings, public meetings or comment period; or 3. Defer action by taking the item under advisement and issuing the decision no later than thirty (30) days following the public meeting, public hearing or comment period. B. No additional noticing is required if a project is continued. C. For applications where a public meeting or public hearing is required to be held before the Director of Community Development, the meeting shall be held in the same manner as a Design Review Committee meeting. 19.12.130 Action by Design Review Committee and Planning Commission. A. For applications where the Design Review Committee or Planning Commission is the Approval Body, it shall render a decision, which is supported by the evidence contained in the application or presented at the meeting, at the meeting, or at a subsequent meeting after conclusion of the public hearing or public meeting, subject to the requirements of Section 19.12.100, Decision. B. For zoning map amendments, on the basis of evidence and testimony presented to the Planning Commission at the public hearing, the Planning Commission may determine that the public interest will be served, either by revising the area being considered for reclassification to include properties not originally part of the application, or by giving consideration to district classifications not originally requested by the application. The Planning Commission may, solely at its option, consider additional properties or district classifications, or both. C. For applications requiring City Council approval, the reviewing body shall forward its written findings, determinations and recommendation to the City Council for final action, subject to the requirements of Section 19.12.100, Decision. 1291 - 60 - 19.12.140 Action by City Council. A. Upon receipt of a recommendation of the reviewing body, the City Council may by resolution approve, modify, or disapprove the recommendation of the reviewing body, subject to the requirements of Section 19.12.100, Decision. B. Upon final approval of a zoning or prezoning application, the City Council shall enact an ordinance zoning or prezoning the subject property or properties, incorporating within the ordinance: 1. A Conceptual development plan, if required, and 2. Conditions of approval. C. For a Development Agreement, the City Council shall enact an ordinance that shall refer to and incorporate the text of the Development Agreement by reference. D. For applications requiring City Council approval, the City Council shall issue its decision at the conclusion of the public hearing or public meeting. 19.12.150 Notice of Decision and Reports. A. Notice of decision: 1. The decision for applications approved with a public meeting or public hearing shall be mailed to the property owner and applicant at the address shown on the application. 2. The decision for applications approved with a notice period shall be mailed to the property owner and the applicant at the address shown on the application and any person who has commented on the proposed project within the notice period. 3. The decision shall contain the following: a. Applicable findings; b. Any reasonable conditions or restrictions deemed necessary to secure the purpose of this title and to assure operation of the development and/or use in a manner compatible with existing and potential uses on adjoining properties and in the general vicinity; and c. Reporting/monitoring requirements deemed necessary to mitigate any impacts and protect the health, safety and welfare of the city. 4. The decision of the Director of Community Development, Design Review Committee or Planning Commission shall be final unless appealed in accord with Section 19.12.170, Appeals. A decision of the City Council shall be final. B. Reports: The Director of Community Development shall endeavor to forward reports, within five calendar days from the date of the decision, to the: 1. Planning Commission and the City Council of a decision by the Director of Community Development 1292 - 61 - 2. Planning Commission and the City Council of a decision by the Design Review Committee. 3. City Council of a decision by the Planning Commission. 19.12.160 Effective date. A. A permit approved by the City Council shall take effect ten days following the date that the findings are adopted. B. Specific Plans, General Plan Amendments, Zoning Ordinance/Map Amendments, and Development Agreements shall become effective thirty (30) days following the final date of action (e.g., adoption) by the City Council. C. All other permits shall take effect fourteen calendar days following the date that the findings are adopted by the appropriate Approval Body, unless an appeal is filed as provided in Section 19.12.170. 19.12.170 Appeals A. An appeal may be filed by any person, firm or corporation aggrieved or affected by any grant, denial, modification or revocation of any permit, or any determination or interpretation related to any provision of this title. B. Filing: 1. An appeal shall be in writing on forms prescribed by the City and shall be filed during regular office hours with the City Clerk within fourteen calendar days after the City decision or if a notice of decision is not required, from the date of the decision or determination, under this title. An appeal not filed within such time shall be barred. The appeal shall state the grounds and basis thereof. 2. Appeals under this chapter are subject to an appeal fee as prescribed by resolution of the City Council. C. Noticing: Notice of hearing shall be given in the same manner in which the original notice was given. If a project with no noticing is appealed, appropriate noticing shall be determined by the Director of Community Development. D. Appeal hearing body shall be determined in accord with Section 19.12.030, Approval Authority. E. Decision of the appeal hearing body: The decision or determination of the appeal hearing body on any appeal shall be final and effective immediately. F. Notice of Decision: Notice of the appeal hearing body’s decision shall be mailed to the original applicant, to the person filing the appeal, and to any other person who has filed a written request with the City Clerk. 19.12.180 Expiration, Extension and Revocation. A. Expiration. 1293 - 62 - 1. Approval on a permit or variance shall become null and void and of no effect, within the time frame specified in Section 19.12.030 following its issuance, unless a shorter or longer time period is specifically prescribed in the conditions of permit or variance, unless: a. A building permit is filed and accepted by the City (fees paid and control number issued.) In the event that a building permit expires for any reason, the permit shall become null and void. b. The permit or variance has been used A permit or variance shall be deemed to be "used" when actual substantial and continuous activity has taken place upon the land subject to the permit or variance or, in the event of the erection or modification of a structure or structures, when sufficient building activity has occurred and continues to occur in a diligent manner. 2. Notwithstanding subsection 1 of this section, if the use for which a conditional use permit was granted and utilized has ceased or has been suspended for one year or more, the permit becomes null and void. 3. Unless a variance or exception has expired pursuant to subsection 1 of this section, it shall continue to exist for the life of the existing structure or such structure as may be constructed pursuant to the approval unless a different time period is specified in its issuance. A variance or exception from the parking and loading regulations, and a sign exception shall be valid only during the period of continuous operations of the use and/or structure for which the variance or exception was issued. B. Extensions. A permit or variance may, in accord with Section 19.12.030, Approval Authority, be extended, one-time only, for the time frame specified in Section 19.12.030, upon timely submittal of an application with the Director of Community Development prior to expiration. C. Revocation 1. Revocation. Process. In any case where, in the judgment of the Director, substantial evidence indicates that the conditions of a permit or variance have not been implemented, or where the permit or variance is being conducted in a manner detrimental to the public health, safety, and welfare, the Director shall set a date for a public hearing before the decision maker granting the original permit or variance, and notice a public hearing in accordance with Section 19.12.110, Noticing, of this code. 2. Findings: A permit may be revoked or modified if any one of the following findings can be made: i. That the permit was obtained by misrepresentation or fraud; ii. That the improvement, use or activity authorized in compliance with the permit had ceased or was suspended for one year or more; iii. That one or more of the conditions of the permit have not been met; or iv. That the owner or occupant of the property is conducting the use or any associated or other use of the property in violation of the law. CLA R I F I C A T I O N 1294 - 63 - v. In the case of revocation of a sign permit, the sign was abandoned for a period of thirty days. 1295 - 64 - CHAPTER 19.20 - PERMITTED, CONDITIONAL AND EXCLUDED USES IN AGRICULTURAL AND RESIDENTIAL ZONES Section 19.20.010 Applicability of Regulations 19.20.020 Permitted, Conditional and Excluded Uses in Agricultural and Residential Zones 19.20.010 Applicability of Regulations No building or structure or land shall be used in an A, A-1, R-1, RHS, R1C, R-2, or R-3 zoning district, otherwise than in conformance with the provisions of this chapter. 19.20.020 Permitted, Conditional and Excluded Uses in Agricultural and Residential Zones Table 19.20.020 sets forth the Permitted, Conditional and Excluded Uses in Agricultural and Residential zones Table 19.20.020 – Permitted, Conditional and Excluded Uses in Agricultural and Residential Zones Zoning Districts A A-1 R-1 RHS R1C R-2 R-3 Uses 1. Agriculture, horticulture, viticulture and forestry, including the following and similar uses: P P - - - - - a. Field and truck crops, including drying and storage, P P - - - - - b. Orchards and vineyards, including bottling and storage, P P - - - - - c. Tree farms, botanical conservatories and arboreta, P P - - - - - d. Barns and sheds, P P - - - - - e. Keeping of draft animals, animals providing products used on the property, and household pets, P P - - - - - f. Livestock ranches and dairy farms depending mainly on grazing on the property, P CUP - PC - - - - - g. Processing of dairy products produced on the property, P CUP - PC - - - - - h. Poultry raising and hatcheries, P CUP - PC - - - - - i. Apiaries, P CUP - PC - - - - - j. Nurseries, greenhouses and landscaping gardens, P CUP - PC - - - - - RE D U N D A N C Y 1296 - 65 - Zoning Districts A A-1 R-1 RHS R1C R-2 R-3 Uses k. Boarding kennels, CUP - PC CUP - PC - - - - - l. Animal breeding; P CUP – Admin. - - - - - 2. Fur farms - CUP - PC - - - - - 3. Retail sale of wine, fruit or berries produced on the property; CUP - CC CUP - CC - - - - - 4. Single-family dwelling unit with not more than one dwelling unit per lot/defined air space for condominiums; P P P P P - - 5. Two-story structures in an area designated for a one-story limitation pursuant to Section 19.28.060 G(6) of this chapter, provided that the Planning Commission determines that the structure or structures will not result in privacy impacts, shadowing, or intrusive noise, odor, or other adverse impacts to the surrounding area; - - CUP - PC - - - - 6. Employee housing: a. For six or fewer employees in each dwelling unit on each lot P P P P P P P b. With no more than 36 beds in group quarters or 12 units/ spaces designed for use by a single family or household on each lot P P - CUP- Admin. - - - 6. Residences of farm workers and their families whose primary employment is incidental and necessary to agricultural operations conducted on the same parcel of land on which such residences are located; P P - - - - - 7. Two-family use under one ownership; - - - - - P - 8.7. A second dwelling unit which conforms to the procedures, standards and requirements of Chapter 19.64 except for a second dwelling unit requiring a conditional use permit; P P P P - - - a. Which conforms to the requirements of Chapter 19.112; P P P P - - - b. Which requires a conditional use permit pursuant to Chapter 19.112; CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. - - - CO N F O R M A N C E WI T H S T A T E L A W MOVED TO DEFINITIONS READABILITY/ INTERNAL CONSISTENCY 1297 - 66 - Zoning Districts A A-1 R-1 RHS R1C R-2 R-3 Uses 9. Second dwelling units which require a conditional use permit pursuant to Chapter 19.84; - - CUP – Admin. CUP – Admin. - - - 10.8. Multiple-family residential dwellings - - - - - - P 11.9. Accessory facilities and uses customarily incidental to permitted uses and otherwise conforming with the provisions of Chapter 19.80 100 of this title; P P P P -P P P 12.10. Utility facilities essential to provision of utility services to the neighborhood but excluding business offices, construction or storage yards, maintenance facilities, or corporation yards; -P -P P -P -P P CUP – CC 13.11. Temporary buildings for construction purposes (including trailers) for a period not to exceed the duration of such construction; - - - - - - P 14. Riding academies, commercial stables, and the boarding of horses; CUP - CC CUP - CC - - - - - 15. Noncommercial stables, and the keeping of riding horses; the number of horses on each lot at any time shall be limited to three except that additional foals may be retained for a period of six months; P P - - - - - 16. Noncommercial stables for riding horses in excess of the number permitted by #16 above of this chapter; CUP - PC CUP - PC - - - - - 17.12. Home occupations, when accessory to permitted use and otherwise conforming to the provisions of Chapter 19.120 of this title and subject to any conditional use permit requirements of that chapter; P P P P P P P a. When accessory to permitted use and otherwise conforming to the provisions of Chapter 19.120 of this title; P P P P P P P b. Requiring a Conditional Use Permit pursuant to Chapter 19.120 of this title; CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. 18. Home occupations requiring a conditional use permit pursuant to Chapter 19.92 of this title; CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. - CUP – Admin. CUP – Admin. 19.13. Small-family day care home per dwelling unit; P P P P P P P CO R R E C T I O N / I N T E R N A L CO N S I S T E N C Y MO V E D B E L O W RE A D A B I L I T Y / I N T E R N A L CO N S I S T E N C Y 1298 - 67 - Zoning Districts A A-1 R-1 RHS R1C R-2 R-3 Uses 20.14. Large-family day care home per dwelling unit, which meets the parking criteria contained in Chapter 19.124, and which is at least three hundred feet from any other large-family day care home. The Director of Community Development or his or her designee shall administratively approve large day care homes to ensure compliance with the parking and proximity requirements; - P P P - P - a. Which meets the parking criteria contained in Chapter 19.124, and which is at least three hundred feet from any other large- family day care home. The Director of Community Development or his or her designee shall administratively approve large day care homes to ensure compliance with the parking and proximity requirements; P P P P P P CUP – Admin. b. Which otherwise does not meet the criteria for a permitted use. The conditional use permit shall be processed as provided by CA Health and Safety Code Section 1597.46 (3); CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. 21. Large-family day care home, which otherwise does not meet the criteria for a permitted use. The conditional use permit shall be processed as provided by Section 1597.46 (3) of the State of California Health and Safety Code; - CUP – Admin. CUP – Admin. CUP – Admin. - CUP – Admin. CUP – Admin. 22. Child day care facilities - - - - - - - CUP – PC 23.15. Residential care facility that is licensed by the appropriate State, County agency or department with six or less fewer residents, not including the provider, provider family or staff , provided that the facility obtains any license, if required, issued by appropriate State and/or County agencies and/or departments; P P P P P P P 24. Residential care facility, in each dwelling unit, that is not required to obtain a license by the State, County agency or department and has six or less residents, not including the provider, provider family or staff; CUP -– PC CUP -– PC CUP -– PC CUP -– PC CUP – PC * CUP -– PC CUP – PC RE A D A B I L I T Y / I N T E R N A L C O N S I S T E N C Y CO N F O R M A N C E WI T H S T A T E W L A W 1299 - 68 - Zoning Districts A A-1 R-1 RHS R1C R-2 R-3 Uses 25.16. Residential care facility, in each dwelling unit, that has the appropriate State, County agency or department license and with seven or greater residents, not including the provider, provider family or staff, and is a minimum distance of five hundred feet from the property boundary of another residential care facility, provided that the facility obtains any license, if required, issued by appropriate State and/or County agencies and/or departments; CUP - PC CUP - PC CUP - PC CUP - PC CUP – PC * CUP - PC CUP – PC 26. Residential care facility, in each dwelling unit, that is not required to obtain a license by the State, County agency or department and has seven or greater residents, not including the provider, provider family or staff, is a minimum distance of five hundred feet from the property boundary of another residential care facility; CUP - PC CUP - PC CUP -– PC CUP -– PC CUP – PC * CUP -– PC CUP – PC 27. Residential care homes in each dwelling unit - - - - - CUP – PC - 28.17. Congregate residence, in each dwelling unit, with ten or less residents; P P P P P P P a. With ten six or less fewer residents P P P P P P P b. With eleven seven or more greater residents which is a minimum distance of one thousand feet from the boundary of another congregate residence and has a minimum of seventy- five square feet of usable rear yard area per occupant CUP – PC CUP – PC CUP – PC CUP – PC CUP – PC * CUP – PC CUP – PC 29. Congregate residence, in each dwelling unit, with eleven or more residents which is a minimum distance of one thousand feet from the boundary of another congregate residence and has a minimum of seventy-five square feet of usable rear yard area per occupant. CUP - PC CUP - PC CUP - PC CUP - PC CUP – PC * CUP - PC CUP – PC 30. Group home with six or fewer persons with continuous twenty four hour care P P P P P P P 31. Group home with greater than six persons; - - CUP -– PC - - - - RE D U N D A N T RE A D A B I L I T Y / C O N F O R M A N C E WI T H S T A T E L A W RE D U N D A N T RE A D A B I L I T Y 1300 - 69 - Zoning Districts A A-1 R-1 RHS R1C R-2 R-3 Uses 32.18. Transitional and supportive housing located in housing of a type permitted in the zone; P P P P P P P 33.19. Supportive housing located in housing of a type permitted in the zone; P P P P P P P 34.20. Horticulture, gardening, and growing of food products: - - P - - - - a. Recreational for personal use; P P P P P P - b. Limited to maximum of ten percent of the lot area and for consumption by occupants of the site; - - - - - - P c. Produce grown on site may be sold if the business activity is conducted in a manner consistent with Chapter 19.120, Home Occupations; - - - P - - - d. Commercial purposes; See #1 See #1 - CUP – Admin. - - - 35. Horticulture, gardening, and growing of food products for consumption by occupants of the site and limited to a maximum of ten percent of the lot area. - - - - - - P 36. Crop, tree or horticultural farming for personal use. Produce grown on the site may be sold if the business activity is conducted in a manner consistent with the home occupation ordinance; - - - P - - - 37. Crop, tree or horticultural farming for commercial purposes; - - - CUP – Admin. - - - 38.21. Limited commercial recreation uses, such as riding clubs and related stables and trails, golf courses, swimming and picnic grounds, - - - CUP - PC - - - 39.22. Golf courses and driving ranges; CUP - CC CUP - CC - - - - - 40.23. Commercial swimming pools and picnic areas; CUP - CC CUP - CC - - - - - 41.24. Temporary uses subject to regulations established by Chapter 19.156 CUP – Admin. CUP – Admin. CUP – Admin. CUP – Admin. -CUP – Admin CUP – Admin. CUP – Admin. RE A D A B I L I T Y / C L A R I F I C A T I O N CL A R I F I C A T I O N CLARIFICATION 1301 - 70 - Zoning Districts A A-1 R-1 RHS R1C R-2 R-3 Uses 42.25. Buildings or structures which incorporate solar design features that require variation from setbacks upon a determination by the Director that the design feature, or features, will not result in privacy impacts, shadowing, or intrusive noise, odor, or other adverse impacts to the surrounding area. CUP – Admin. CUP – Admin. - CUP – Admin. - - - 43.26. Transmission lines, transformer stations, television and radio towers, and other public utility and communication structures; CUP - PC CUP - PC - - - - - 44.27. The keeping of a maximum of four a Adult (over 4 months of age) household pets per dwelling unit, limited as follows: , provided that no more than two adult dogs or cats may be kept on the site;: - - P - - P P a. No specified number P P - - - - - b. Maximum of four, provided no more than two adult dogs or cats may be kept on the site - - P - P P P c. Limited to one per three thousand square feet of lot area, except: - - - P † - - - 1. Dogs are limited to a maximum of two on lots less than one acre and four for lots greater than one acre, 2. The number of geese, ducks, chickens, rabbits and other farm animals are not limited on a site greater than one acre 45.28. The keeping of one l Litter of dogs or cats up to four months of age:. - - P - P P P a. No specified number P P - P - - - b. Maximum of one - - P - P P P 46. Household pets limited to one animal per three thousand square feet of lot area, except: - - - P † - - - a. Adult dogs are limited to a maximum of two for lots less than one acre and four for lots greater than one acre, b. The number of geese, ducks, chickens, rabbits and other farm animals are not limited on a site greater than one acre, 47. Small household pets - - - P † - - - RE A D A B I L I T Y / C L A R I F I C A T I O N REDUNDANT 1302 - 71 - Zoning Districts A A-1 R-1 RHS R1C R-2 R-3 Uses 48.29. Large animals, such as horses, cows, sheep, and goats, limited as follows, provided no animals are kept, maintained and raised for commercial purposes, limited as follows: -See #1 -See #1 - P † - - - a. Two large animals for the first 40,000 square feet of land area, except mules and donkeys which require 80,000 square feet for the first animal, b. One additional large animal for each additional 20,000 square feet of land area, c. One additional large animal if said animal is raised for a 4H project, a project sponsored by a recognized agricultural organization or a school project, 49.30. The keeping of any animal not otherwise permitted above: in #27, 28, 45, 46 and 4729; - - - CUP – Admin. - - - 50.31. Riding academies, commercial stables, and the boarding of horses; CUP - CC CUP - CC - - - - - 51.32. Noncommercial stables, and the keeping of riding horses: a. Limited to three horses on each lot at any time except that additional foals may be retained for a period of six months; P P - - - - - b. In excess of the number permitted in 32(a) CUP – CC CUP – CC - - - - - 52.33. Cemeteries, crematoriums, mausolea, and columbariums CUP - CC CUP - CC - - - - - 53.34. Mines, quarries and gravel pits; CUP - CC CUP - CC - - - - - 54.35. Guest ranches; CUP - CC CUP - CC - - - - - 55.36. Public and quasi-public buildings and uses. CUP - CC CUP - CC - - - - - 56.37. Hog farms; Ex Ex - - - - - 57.38. Cattle farms mainly depending upon feed brought onto the property; Ex Ex - - - - - CL A R I F I C A T I O N RE A D A B I L I T Y / M O V E D FR O M A B O V E 1303 - 72 - Zoning Districts A A-1 R-1 RHS R1C R-2 R-3 Uses 58.39. Slaughterhouses, fertilizer yards, feed yards, boneyards or plants for the reduction of animal matter; Ex Ex - - - - - 59.40. Commercial feed sales; Ex Ex - - - - - 60.41. Other semiagricultural uses mainly depending upon raw materials, semifinished products, or feed brought on to the property; Ex Ex - - - - - 61.42. Other agricultural uses which, in the opinion of the Director of Community Development, create a private or public nuisance. Ex Ex - - - - - Key: P – Permitted Use - – Not Allowed CUP – Admin. – Conditional Use Permit issued by the Director of Community Development CUP – PC – Conditional Use Permit issued by the Planning Commission CUP – CC – Conditional Use Permit issued by the City Council * May be permitted in locations where the use is compatible with existing and planned uses within the development area in the opinion of the Director of Community Development, † The required lot area for a large animal shall not be included in the required lot area for a household pet or vice versa, except that a maximum of two household pets may be kept with large animals, All animals must be kept and maintained in accordance with other Cupertino or Santa Clara County codes and ordinances, Ex - Excluded Uses 1304 - 73 - CHAPTER 19.56: DENSITY BONUS Section 19.56.010 Purpose. 19.56.020 Applicability of Regulations. 19.56.030 ConcessionsDensity Bonus. 19.56.040 General RequirementsIncentives/Concessions. 19.56.050 General Requirements for Projects with Affordable Units. 19.56.060 Application Requirements. 19.56.070 Findings. 19.56.010 Purpose. The density bonus ordinance codified in this chapter is intended to comply with the State Density Bonus Law, Government Code Section 65915, which provides that a local agency shall adopt an ordinance specifying how the agency will comply with that section. government shall grant a density bonus and an additional concession, or financially equivalent incentive(s), to a developer of a housing development agreeing to construct a specified percentage of housing for lower income households, very low income households or senior citizens. 19.56.020 Applicability of Regulations. A. All hHousing developments greater thanresulting in a net increase of at least five units (excluding density bonus units) are eligible for one a density bonus of at least twenty-five percent, and an additional concession as provided in this chapter, when the applicant for the housing development, to developers agreesing or proposes to construct at least one of the following: 1. Construct: 1.a. Twenty Ten percent of the total units affordable tofor lower income households at affordable rent or affordable housing cost; or 2.b. Ten Five percent of the total units affordable tofor very low income households at affordable rent or affordable housing cost; or c. Ten percent of the total units proposed in a common interest development for sale to moderate income households, provided that all units in the development are offered to the public for purchase; or d. Fifty percent of the units for sA senior citizens housing development, unless prohibited by State and/or Federal law. 2. Donate land in accordance with Section 19.56.030C; 3. Provide affordable housing in a condominium conversion project in accordance with Section 19.56.030E. CONFORMANCE WITH STATE LAW 1305 - 74 - B. In addition to meeting the requirements of 19.56.020A, housing developments which include a child care facility in accordance with Section 19.56.030D, is entitle to an additional density bonus; C. An applicant may also submit a proposal for specific incentives or concessions to be granted in conjunction with the density bonus, as provided in Section 19.56.040; D. The granting of a density bonus, incentive or concession, in and of itself, shall not require a general plan amendment, zone change, or other discretionary approval and shall be reviewed concurrently with the review of the housing development. If a development agrees to construct both twenty percent of the total units for lower-income households and ten percent of the total units for very low-income households, the developer remains entitled to only one density bonus and an additional concession. However, in such circumstance, the City, at its discretion, may grant more than one density bonus. C. Projects with affordable units which meet the requirements set forth in this chapter are entitled to a density bonus and additional concession, unless: 1. The City Council adopts a written finding that the additional concession is not required to make the units affordable. D. Nothing in this chapter limits the City’s right to deny an affordable housing project if the City Council finds, based on substantial evidence, any one of the following: 1. The City has adopted an adequate housing element, and the project is not needed for the City to meet its share of the regional housing need of lower income housing. 2. The project as proposed would have a specific, adverse impact upon the public health or safety which cannot be satisfactorily mitigated without rendering it unaffordable to lower- income households. 3. The denial of the project or imposition of conditions is required in order to comply with State or Federal law and there is no feasible method to comply without rendering the development unaffordable to lower-income households. 4. Approval of the development project would increase the concentration of lower-income households in a neighborhood that already has a disproportionately high number of lower - income households. 5. The development project is proposed on land zoned for agriculture or resource preservation which is surrounded on at least two sides by land being used for agricultural or resource preservation purposes, and which does not have adequate water or wastewater facilities to serve the project. 6. The development project is inconsistent with the City’s General Plan land use designation as it existed on the date the application was deemed complete, and the City has adopted a housing element pursuant to State law. E. Nothing in this chapter limits the City’s right to deny a senior citizen housing project if the City finds, based on substantial evidence, that the project would have a specific, adverse 1306 - 75 - impact upon the public health or safety; and there is no feasible method to satisfactorily mitigate or avoid the adverse impact identified. 19.56.030 Density Bonus A. Housing developments that meet the criteria in Section 19.56.020A(1) are eligible for a maximum density bonus as set forth in Table 19.56.030. Table 19.56.030: Density Bonus Calculations Percentage of Affordable Units Provided in Income Category Very Low Income Units Low Income Units Moderate Income Units 5% 20% - - 6% 22.5% - - 7% 25% - - 8% 27.5% - - 9% 30% - - 10% 32.5% 20% 5% 11% 35% 22% 6% 12% 35% 23% 7% 13% 35% 25% 8% 14% 35% 26% 9% 15% 35% 28% 10% 16% 35% 29% 11% 17% 35% 31% 12% 18% 35% 32% 13% 19% 35% 34% 14% 20% 35% 35% 15% 21% 35% 35% 16% 22% 35% 35% 17% 23% 35% 35% 18% 24% 35% 35% 19% 25% 35% 35% 20% 26% 35% 35% 21% 27% 35% 35% 22% 28% 35% 35% 23% 29% 35% 35% 24% 30% 35% 35% 25% 31% 35% 35% 26% 32% 35% 35% 27% 33% 35% 35% 28% 34% 35% 35% 29% 35% 35% 35% 30% CONFORMANCE WITH STATE LAW 1307 - 76 - Percentage of Affordable Units Provided in Income Category Very Low Income Units Low Income Units Moderate Income Units 36% 35% 35% 31% 37% 35% 35% 32% 38% 35% 35% 33% 39% 35% 35% 34% 40% 35% 35% 35% B. Senior housing developments are entitled to a maximum density bonus of 20 percent provided the development comprises of at least 35 units, conforms with Civil Code Section 51.3 and the units are reserved for qualifying residents. The development does not have to provide affordable units. C. Donation of Land: 1. When an applicant donates land to the City in accordance with the requirements of Section 19.56.020C(2), the development shall be entitled to a 15 percent density bonus. The development is entitled to an additional one percent density bonus for the donation of land that would allow the development of an additional one percent of affordable units above the minimum requirements in Section 19.56.020C(2), up to a maximum of 35 percent. 2. The donation of land must meet the following requirements: a. The land shall be donated and transferred no later than the date of approval of the application. b. The developable acreage and zoning classification of the land being transferred are sufficient to permit construction of units affordable to very low income households in an amount not less than 10 percent of the number of residential units of the proposed development. c. The transferred land is at least one acre in size or of sufficient size to permit development of at least 40 units, has the appropriate General Plan designation, is appropriately zoned with appropriate development standards for development at the density described in Government Code Section 65583.2(c)(3), and is or will be served by adequate public facilities and infrastructure. d. The transferred land shall have all of the permits and approvals, other than building permits, necessary for the development of the very low income housing units on the transferred land not later than the date of approval of the final subdivision map, parcel map, or residential development application, except that the City may subject the proposed development to subsequent design review to the extent authorized by Government Code Section 65583.2(i) if the design is not reviewed by the City prior to the time of transfer. CONFORMANCE WITH STATE LAW 1308 - 77 - e. The land shall be transferred to the City or to a housing developer approved by the City. The City may require the applicant to identify and transfer the land to the developer. f. The transferred land shall be within the boundary of the proposed development or, if the City agrees, within one-quarter mile of the boundary of the proposed development. g. A proposed source of funding for the very low income units shall be identified not later than the date of approval of the proposed development. h. The transferred land and the affordable units shall be subject to a deed restriction ensuring continued affordability of the units consistent with Government Code Section 65915(c)(1) or (2), as applicable. D. Provision of Child Day Care Facilities 1. When a housing development is proposed that contains affordable housing as provided in Section 19.56.030A and includes a child day care facility that will be located on the premises of, as part of, or adjacent to, the project, the City shall grant either of the following, except as specifically stated elsewhere: a. An additional density bonus in residential square footage that is equal to or greater than the square footage of the child day care facility. b. An additional concession or incentive that contributes significantly to the economic feasibility of the construction of the child day care facility in accordance with Section 19.56.040. 2. The City shall also require that as a condition of approving the housing development: a. The child day care facility shall remain in operation for a period of time that is as long as or longer than the period of time during which the affordable units are required to remain affordable. b. Of the children who attend the child day care facility, the children of very low income households, lower income households, or families of moderate income shall equal a percentage that is equal to or greater than the percentage of dwelling units that are required for very low income households, lower income households, or families of moderate income. 3. Notwithstanding any requirement of this subdivision, the City shall not be required to provide a density bonus or concession for a child day care facility if the City finds, based upon substantial evidence, that the community has adequate child day care facilities. E. Condominium Conversions 1. When an applicant for approval to convert apartments to a condominium project agrees to provide at least 33 percent of the total units of the proposed condominium project to low or moderate income households, or 15 percent of the total units of the proposed CONFORMANCE WITH STATE LAW 1309 - 78 - condominium project to lower income households, and agrees to pay for the reasonably necessary administrative costs incurred by the City, the City shall either: a. Grant a density bonus of 25 percent over the number of apartments to be provided within the existing structure or structures proposed for conversion; or b. Provide other incentives of equivalent financial value. This shall not require the City to provide cash transfer payments or other monetary compensation but may include the reduction or waiver of requirements which the City might otherwise apply as conditions of conversion approval. 2. The City may place such reasonable conditions on the granting of a density bonus or other incentives of equivalent financial value as the City finds appropriate, including but not limited to, conditions which assure continued affordability of units to subsequent purchasers who are persons and families of low and moderate income or lower income households. 3. An application shall be ineligible for a density bonus or other incentives under this section if the apartments proposed for conversion constitute a housing development for which a density bonus or other incentives were previously provided under Government Code Section 65915. 4. Nothing in this section shall be construed to require the City to approve a proposal to convert apartments to condominiums. F. Density Bonus Calculations: 1. A density bonus may be selected from only one income or development category listed above, except that density bonuses for land donation may be combined with others, up to a maximum of 35 percent, and an additional square-foot bonus may be granted for a child day care facility as provided in Section 19.56.030C. 2. In determining the number of density bonus units to be granted, any fractions of density bonus units shall be rounded up to the next whole number. 3. Density bonus units authorized by this section shall not be included when determining the number of affordable units, required to qualify for the density bonus. In determining the number of affordable units, any fractions of affordable units shall be rounded up to the next whole number. 4. An applicant may request a lower density bonus than the housing development is entitled to, but no reduction will be permitted in the percentage of required affordable units as shown in Section 19.56.020. 5. Regardless of the affordable units, no housing development will be entitled to a density bonus of more than 35 percent unless approved by the City pursuant to Section 19.56.030F(7). 6. The City, at its discretion, may grant additional density bonuses. While the maximum density bonus, the City is required to provide pursuant to State Law, is thirty-five (35) CONFORMANCE WITH STATE LAW 1310 - 79 - percent; this is not the maximum amount that an applicant may obtain. An applicant may negotiate with the City to obtain a density bonus higher than the maximum set forth in Table 19.56.030 in exchange for including even more affordable units than are provided in the table and/or the provision of other amenities or considerations. A.7. For purposes of calculating a density bonus, the residential units do not have to be based upon individual subdivision maps or parcels. The density bonus shall be permitted in geographic areas of the housing development other than the areas where the affor dable units are located. 19.56.030040 Incentives and Concessions. The State-mandated concession will be selected from the following list: A. A housing development is eligible for Incentives and Concessions as shown in Table 19.56.040A. Incentives and Concessions must be selected from only one category (very low, low, or moderate). No incentives are available for land donation or for a senior citizen housing development that is not affordable. Condominium conversions and day care centers may have one incentive or a density bonus, at the City's option, but not both. Table 19.56.040A: Incentives and Concessions Calculations: Unit Type Percent of Affordable Units Number of Incentives/Concessions Very Low Income Units 5% or greater 1 10% or greater 2 15% or greater 3 Low Income Units 10% or greater 1 20% or greater 2 30% or greater 3 Moderate Income Units 10% or greater 1 20% or greater 2 30% or greater 3 B. For purposes of this chapter, permissible concessions and incentives include, but are not limited to: A.1. A reduction in of site development standards or a modification of the zoning code requirements or of the Zoning Ordinancearchitectural design requirements that exceed the minimum building standards approved by the California Building Standards Commission as provided in Part 2.5 (commencing with Section 18901) of Division 13 of the Health and Safety Code, including but not limited to, a reduction in setback requirements, square footage or parking requirements, such that the reduction or modification results in identifiable, financially sufficient, and actual cost reductions. For applications involving the modification of zoning or development standards, the housing CONFORMANCE WITH STATE LAW MO V E D F R O M BE L O W 1311 - 80 - developer shall show that the waiver or modification is necessary to make the housing units economically feasible. Permissible incentives include, but are not limited to: 1. Reduction of parking requirements, 2. Reduction of open space requirements, 3. Reduction of setback requirements, 2. Approval of mixed-use zoning in conjunction with the housing project if commercial, office, industrial or other land uses will reduce the cost of the housing development, and if the commercial, office, industrial or other land uses are compatible with the housing project and the existing or planned development in the area where the proposed housing project will be located; B. 3. Other regulatory incentives or concessions proposed by the developer or the City, which result in identifiable financially sufficient and actual cost reductions. Permissible concessions include, but are not limited to: 1. Reduction of park dedication fees, 2. Reduction of application or construction permit fees, 3. Provision of tax-exempt financing or other financial assistance as approved by the City Council; C. Nothing in this section requires the provision of direct financial incentives for the housing development, including but not limited to the provision of financial subsidies, publicly owned land by the City or the waiver of fees or dedication requirements. The City, at its sole discretion, may choose to provide such direct financial incentives; D. An applicant may submit to the City a proposal for the waiver or reduction of development standards that will have the effect of physically precluding the construction of a development meeting the criteria outlined in Section 19.56.020 at the densities or with the concessions or incentives permitted under this chapter. A proposal for the waiver or reduction of development standards shall neither reduce nor increase the number of incentives or concessions to which the applicant is entitled. The applicant shall bear the burden of demonstrating that the development standards that are requested to be waived will have the effect of physically precluding the construction of the housing development with the density bonuses and incentives. E. If the housing development is eligible for density bonus as provided in Section 19.56.020, upon request of the applicant, the maximum off-street parking standards that can be applied, inclusive of handicapped and guest parking are indicated in Table 19.56.040B. These may include tandem and uncovered parking spaces. Table 19.56.040B: Off-street parking standards with Number of bedrooms Maximum number of off-street parking spaces 0 – 1 One (1) 2 – 3 Two (2) CONFORMANCE WITH STATE LAW 1312 - 81 - 4 + Two and one-half (2.5) C.F. A housing development which provides affordable unitsrequests incentives or concessions must show that the requested concessions directly affect the economic feasibility of including the affordable units in the projectare required to provide for affordable rents or affordable housing costs, as applicable. 19.56.040050 General Requirements. B.A. Affordable for-sale and rental low and very low income units must remain affordable to low or very low income households, as applicable, for thirty years if both a density bonus and an additional concession are granted. These units shall remain affordable or for a longer period of time if required by the a construction or mortgage financing assistance program, mortgage insurance program, or rental subsidy program. If only a density bonus is granted, the affordable units shall remain affordable for ten years. Affordable for-sale moderate income units must remain affordable to moderate-income households for the duration required by the City’s Residential Housing Mitigation Program or for a longer period of time if required by a construction or mortgage financing assistance program, mortgage insurance program, or rental subsidy program. Sales price for for-sale affordable very low, low, and moderate income units shall be set at affordable housing cost. Rents for affordable low and very low income rental units shall be set at an affordable rent. B. The affordable dwelling units and land dedication that qualify a housing development for a density bonus may also be used to meet the below-market-rate housing provisions of the City’s Residential Housing Mitigation Program, provided that the affordable units and land dedication comply with the requirements of both Chapter 19.56, Density Bonus, and the Residential Housing Mitigation Program regarding the required number of affordable units, required level of affordability, and term of affordability so as to provide the greatest affordability to the most households for the longest term. C. Unless otherwise governed by other funding sources, Ffirst priority for the affordable units will be given to individuals who reside, work, go to school, or have family in the City of Cupertino. D. A master regulatory agreement shall be made between the developer and the City which indicates the household type, number, location, size and construction scheduling of all affordable units, and such information as shall be required by the City for the purpose of determining the developer's compliance with this chapter. The regulatory agreement shall be recorded against the housing development prior to final or parcel map approval or, where a map is not being processed, prior to issuance of any building permits, and shall be binding on all future owners and successors in interest. E. Affordable units in a project and phases of a project shall be constructed concurrently with or prior to the construction of market-rate units. F. Affordable units shall be provided as follows: 1. Affordable units shall be dispersed throughout the project; CONFORMANCE WITH STATE LAW 1313 - 82 - 2. Affordable units shall be identical with the design of any market rate rental units in the project with the following exception: that a a.2. Rreduction of interior amenities for affordable units will be permitted upon prior approval by the City Council as necessary to retain project afford-ability. G. For purposes of calculating a density bonus, the residential units do not have to be based upon individual subdivision maps or parcels. The density bonus shall be permitted in geographic areas of the housing development other than the areas where the affordable units are located. H. The developer shall submit a project financial report (pro forma) to allow the City to evaluate the financial need for the State-mandated additional incentivesdemonstrating that the requested incentives or concessions are required to provide for affordable rents or affordable housing costs, as applicable. The City may retain a consultant to review the financial report. The cost of the consultant shall be borne by the developer with the following exception: 1. If the applicant is a nonprofit organization, the cost of the consultant may be paid by the City upon prior approval of the City Council. 19.56.050 Requirements for Projects with Affordable Units. A.I. All affordable units shall be occupied by the household type specified in the written agreement required under Section 19.52.020C050C. The developer’s obligation to maintain these units as affordable housing shall be evidenced by the master regulatory agreement which shall be recorded as deed restriction running with the land. B. Those units targeted for lower-income households shall be affordable at a rent that does not exceed thirty percent of the HUD income limits for lower-income households for Santa Clara County adjusted for household size. C. Those units targeted for very low-income households shall be affordable at a rent that does not exceed twenty-five percent of the HUD income limits for very low-income households for Santa Clara County adjusted for household size. J. Prior to the rental or sale of any affordable unit, the City or its designee, shall verify the eligibility of the prospective tenant or buyer. I.K. The City may establish fees associated with the setting up and monitoring of affordable units. L. For rental affordable very low and low income units: D.1. The owner shall obtain and maintain on file certifications by each household. Certification shall be obtained immediately prior to initial occupancy by each household and annually thereafter, in the form provided by the City or its designee. The owner shall obtain updated forms for each household on request by the City, but in no event less frequently than once a year. The owner shall maintain complete, accurate and current records pertaining to the housing development, and will permit any duly READABILITY MO V E D U P CONFORMANCE WITH STATE LAW MO V E D U P MO V E D F R O M BE L O W CO N F O R M A N C E WI T H S T A T E L A W 1314 - 83 - authorized representative of the City to inspect the records pertaining to the affordable units and occupants of these units. E. The City may establish fees associated with the setting up and monitoring of affordable units. F.2. The owner shall submit an annual report to the City, on a form provided by the City. The report shall include for each affordable unit the rent, income, and family size of the household occupying the unit. 3. The owner shall provide to the City any additional information required by the City to insure the long-term affordability of the affordable units by eligible households. 19.56.060 Application Requirements. A. An applicant developer may submit to the Planning Department a preliminary proposal for the development of housing development pursuant to this chapter prior to the submittal of any formal application. The City shall, within ninety days of receipt of a written proposal, notify the housing developer in writing of its local density procedures. The City shall establish procedures for waiving or modifying development and zoning standards which would otherwise inhibit the utilization of the density bonus on a particular site. These procedures shall include, but not be limited to, such items as minimum lot size, side-yard setbacks, and placement of public works improvements. The housing developer shall show that the requested waiver or modification is necessary to make the affordable units economically feasible. B. All requests pursuant to this Chapter shall be submitted to the City concurrently with the application for the first discretionary permit or other permit required for the housing development and shall be process concurrently with the discretionary Formal application shall following the review process as set forth for permits in Chapter 19.12, Administration of the Cupertino Municipal Code established by the City. and The applicant shall provide additional information as specified in this chapter, specifically: 1. Provide a written statement specifying the desired density increase, incentives and any waivers requested, proposed rent schedules and/or sales prices, and the type, location, size and construction scheduling of all dwelling units; 2. Submit a project financial report (pro forma) demonstrating that the requested incentives will result in identifiable, financially sufficient, and actual cost reductions to the housing development and they are required to provide for affordable rents or affordable housing costs, as applicable. The pro forma shall include the capital costs, operating expenses, return on investment, loan-to-value ratio and the debt coverage ratio including the contribution(s) provided by any applicable subsidy program(s), as required; 3. An appraisal report indicating the value of the density bonus and of the incentive(s)/concession(s); CONFORMANCE WITH STATE LAW 1315 - 84 - 4. A use of funds statement identifying the financial gaps for the housing development with the affordable housing units. The analysis shall show how the funding gap relates to the incentive(s)/concession(s); 5. For any requested waiver of a development standard, evidence that the development standard for which the waiver is requested will have the effect of physically precluding the construction of the housing development with the density bonus and incentives requested. 6. If a mixed use building or project is proposed as an incentive, evidence that non- residential land uses will reduce the cost of the housing development and that the non- residential land uses are compatible with the development and the existing or planned development in the area. 7. If a density bonus is requested for a land donation, the location of the land to be dedicated, proof of site control, and evidence that each of the requirements included in Section 19.56.030C can be met. 8. If a density bonus or incentive is requested for a child care facility, evidence that all of the requirements in Section 19.56.030D can be met. 2.9. If a density bonus or incentive is requested for a condominium conversion, evidence that all of the requirements in Section 19.56.030E can be met. 3.10. Any other information requested by the Director of Community Development to determine if the required findings can be made. 19.56.070 Findings. A. Before approving an application that includes a request for a density bonus, incentive, parking reduction and/or waiver pursuant this chapter, the decision-making body shall make the following findings, as applicable: 1. A finding that the residential project is eligible for the density bonus and any incentives, parking reductions or waivers requested. 2. A finding that any requested incentive will result in identifiable, financially sufficient, and actual cost reductions based upon the financial analysis and documentation provided. 3. If the density bonus is based all or in part on donation of land, a finding that all the requirements included in Section 19.56.030C have been met. 4. If the density bonus or incentive is based all or in part on the inclusion of a child care facility, a finding that all the requirements included in Section 19.56.030D have been met. 5. If the density bonus or incentive is based on a condominium conversion, a finding that all the requirements included in Section 19.56.030E have been met. 6. If the incentive includes mixed-use development, a finding that all the requirements included in Section 19.56.040B(2) have been met. CONFORMANCE WITH STATE LAW 1316 - 85 - 7. If a waiver is requested, a finding that the development standards for which the waiver is requested would have the effect of physically precluding the construction of the housing development with the density bonus and incentives permitted. B. If the findings required by subsection (A) of this section can be made, the decision-making body may deny an application for an incentive or waiver requested pursuant to Section 19.56.040 only if it makes one of the following written findings as applicable to each type of application, supported by substantial evidence: 1. That the incentive is not required to provide for affordable rents or affordable sales prices; or 2. That the incentive or waiver would have an adverse impact on real property listed in the California Register of Historic Resources; or 3. That the incentive or waiver would have a specific, adverse impact upon public health or safety or the physical environment, and there is no feasible method to satisfactorily mitigate or avoid the specific adverse impact without rendering the residential project unaffordable to low and moderate income households. For the purpose of this subsection, "specific adverse impact" means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, written public health or safety standards, policies, or conditions as they existed on the date that the application for the residential project was deemed complete; or 4. That the incentive or waiver is contrary to state or federal law. C. If the findings required by subsection (A) of this section can be made, the decision-making body may deny an application for a density bonus or incentive that is based on the provision of child care only if it makes a written finding, based on substantial evidence, that the city already has adequate child care facilities. CONFORMANCE WITH STATE LAW 1317 - 86 - CHAPTER 19.76: PUBLIC BUILDING (BA), QUASI PUBLIC BUILDING (BQ) ANDTRANSPORTATION (T) ZONES Section 19.76.020 Applicability of Regulations. 19.76.030 Permitted, Conditional and Excluded Uses in BA, BQ and T Zones. 19.76.040 Permits Required for Development. 19.64.050 Application Requirements. 19.64.060 Site Development Regulations. 19.76.010 Purpose. The BA, BQ and T zoning districts are designed to accommodate governmental, public utility, educational, religious, community service, transportation, or recreational facilities in the City. 19.76.020 Applicability of Regulations. The specific regulations of this chapter shall apply to all BA, BQ and T zoning districts. 19.76.030 Permitted, Conditional and Excluded Uses in BA, BQ and T Zones. Permitted, Conditional and Excluded Uses that may be conducted from property zoned Public Building (BA), Quasi-Public Building (BQ), and Transportation (T) are identified in Table 19.76.030, Permitted, Conditional and Excluded Uses in Public, Quasi-Public and Transportation Zoning Districts. Table 19.76.030 – Permitted, Conditional, and Excluded Uses in BA, BQ and T Zones Zoning Districts BA BQ T Uses 1. Buildings and other uses on land owned or utilized by a federal, state, county, or city government or authority, or by a special district created for public purposes under the laws of the State of California are permitted in a BA zone. P - - 2. Rotating homeless emergency shelter provided that the following conditions are met: a. Shelter is located within an existing church structure; b. The number of occupants does not exceed twenty-five; c. The hours of operation do not exceed six p.m. to seven a.m.; d. Adequate supervision is provided; e. Fire safety regulations are met; and f. Operation period does not exceed two months in any twelve- month period at any single location. - P - 3. Permanent emergency shelter provided the following conditions are met: a. Section 19.76.030(2)(ab),-(d), (e); - P - CO N F R O M A N C E WI T H S T A T E L A W 1318 - 87 - Zoning Districts BA BQ T Uses b. A management plan is provided which includes a detailed operation plan; a.c. Shelter is available to any individual or household regardless of their ability to pay; and b.d. Occupancy is limited to six months or less. 4. Public utility companies regulated by the Public Utility Commission for uses restricted to administrative and office buildings, communication equipment buildings, including parking, landscaping and maintenance within an enclosed area or storage yard; - CUP - PC - 5. Religious, civic, and comparable organizations, for uses restricted to church buildings, community halls, administrative buildings, schoolrooms, recreational facilities, and athletic fields, convents, seminaries, and similar uses customarily associated with churches, including parking and landscaping areas; - CUP – PC - 6. Child care facility, residential care facilities, congregate residence, hospitals, vocational and specialized schools; - CUP – PC - 7. Lodges, clubs, country clubs, including accessory uses such as swimming pools, picnic areas, golf courses, driving tees or ranges, miniature golf courses (all uses to be restricted to members of the above organizations and their guests); - CUP – PC - 8. Large-family daycare home; - CUP – PC - 9. Airports, airfields and helicopter terminals, including administration and service buildings, maintenance and storage yards - - CUP – PC 10. Railroads, including terminals and stations, freight yards, marshaling yards, storage yards, administrative and service buildings - - CUP – PC 11. Bus terminals and stations, including administration and service buildings, maintenance and storage yards - - CUP – PC 12. Freeways, expressways, and other roads with limited or controlled access, including administrative buildings and maintenance yards - - CUP – PC Key: P – Permitted Use - – Not Allowed CUP – Admin. – Conditional Use Permit issued by the Director of Community Development CUP – PC – Conditional Use Permit issued by the Planning Commission CUP – CC – Conditional Use Permit issued by the City Council Ex - Excluded Uses CO N F R O M A N C E WI T H S T A T E L A W 1319 - 88 - 19.76.040 Permits Required for Development. Prior to the erection of a new building or structure or enlargement or modification of an existing building, structure, or site (including landscaping and lighting) in a BA. BQ or T zoning district, the applicant for a building permit must obtain permits in accord with Chapter 19.12. 19.64.050 Application Requirements. Prior to the issuance of development permits, or any amendment thereto, an application shall be made that, in addition to the requirements in Chapter 19.12, shall include a development plan. The plan shall include: A. Types and heights of buildings/structures and location of areas where buildings are to be placed; B. A proposed system of public and private streets, including cross-sections for all types of streets; C. Landscape plans; D. Parking and loading plans as required by this title; E. Any other information, which the Director of Community Development requires in order to evaluate the effects of the proposed facilities on the surrounding areas. 19.64.060 Site Development Regulations. A. Maximum Height of Buildings and Structures. The height of buildings in BA, BQ and T zone districts is regulated by the development plan. B. Setbacks and Screening. 1. There are no minimum setbacks in BA, BQ or T zoning districts; provided, however, that the Planning Commission may establish minimum setbacks with respect to each individual application for a development permit or a conditional use permit in order to provide adequate light, air and visibility at intersections, and to provide general conformity with adjacent and nearby zones and lots, or to promote the general excellence of the development; 2. Adequate screening to limit noise, to reduce glare of lights, and to prevent obnoxious emissions shall be provided when deemed appropriate by the Planning Commission. 1320 - 89 - CHAPTER 19.84: PERMITTED, CONDITIONAL AND EXCLUDED USES IN OPEN SPACE, PARK AND RECREATION AND PRIVATE RECREATION ZONING DISTRICTS Section 19.84.010 Applicability of Regulations19.84.010 Applicability of Regulations 19.84.020 Permitted, Conditional and Excluded Uses in Open Space, Park and Recreation and Private Recreation Zones 19.84.010 Applicability of Regulations No building or structure or land shall be used in an OS, PR and FP zoning district, otherwise than in conformance with the provisions of this chapter. 19.84.020 Permitted, Conditional and Excluded Uses in Open Space, Park and Recreation and Private Recreation Zones Table 19.84.020 sets forth the Permitted, Conditional and Excluded Uses in Open Space, Park and Recreation and Private Recreation zones. Table 19.84.020 – Permitted, Conditional and Excluded Uses in Open Space, Park and Recreation and Private Recreation Zones Zoning Districts OS PR FP Uses A. Low-intensity recreational uses such as hiking, birdwatching, walking, picnicking and other similar activities P -P - B. Minor maintenance of vegetation such as mowing or trimming P -P -P C. Incidental gardening P -P -P D. The erection or maintenance of minor structures, such as fences, gates, culverts and drainage ditches. P -P -P E. Any legal nonconforming use as provided for in Chapter 19.140 of the City’s Ordinance Code P -P -P F. Temporary uses subject to regulations established by Chapter 19.160 CUP – Admin -P -CUP- Admin G. Noncommercial stables for riding horses CUP – Admin - - CL A R I F I C A T I O N RE D U N D A N T 1321 - 90 - Zoning Districts OS PR FP Uses H. Artificial or constructed pools, ponds, lakes or streams CUP - Admin -P -CUP – PC I. Playgrounds CUP - Admin -P -CUP - PC J. Any other use which is compatible with open space or park and recreation and otherwise is in conformance with the purposes of the OS or PR zoning districts CUP - Admin -P - K. Parks, playgrounds, and recreation facilities, as regulated by Title 13 of this code - P - L. Agricultural activities for educational and recreational purposes, such as community gardens and hobby farms uses such as crop and tree farming, and the keeping of domestic barnyard animals - P - M. Single-family residences for the purpose of housing a caretaker for the park. The residence may take the form of a mobilehome as well as a permanent residential structure. - P - N. Accessory facilities and uses customarily incidental to permitted uses and otherwise conforming with the provisions of Chapter 19.92 of this title -P P -P O. Parking facilities as necessary for park usage - P - P. Outdoor Uses: 1. Equestrian center including riding academies, stables and horse rental, 2. Practice range for archery or firearms, 3. Golf course with or without driving range, 4. Swim and racquet club, 5. Swimming, diving or related sports center, 6. Picnic areas, 7. Racquet sports center for tennis, racquetball, badminton and similar activities, 8. Specialty outdoor activity center encompassing one or more of the following or similar uses: a. Roller skating, b. Skateboarding, c. Lawn bowling, bocce ball, d. Miniature golf, - - CUP – PC CL A R I F I C A T I O N CO N F O R M A N C E WI T H S T A T E L A W 1322 - 91 - Zoning Districts OS PR FP Uses e. Waterslide, 9. Commercial athletic field for one or more of the following or similar uses: a. Baseball, softball or batting cage training, b. Football c. Soccer, d. Volleyball, e. Field hockey, f. Basketball, 10. Amusement parks with or without rides or live entertainment, 11. Bicycle motocross course/go-cart track or similar specialty raceway, but excluding facilities for racing of automobiles or motorcycles, 12. Air sports field for hang gliding, ultralight aircraft or ballooning, but excluding common carrier passenger aircraft service, 13. Other outdoor recreation uses which are found by the Director of Community Development to be of similar intensity and characteristics of use to those enumerated in this subdivision; - - - - CUP – PC CUP - PC Q. Indoor Uses: 1. Museums and galleries, 2. Theaters for film, stage or music entertainment, 3. Specialty indoor activity center encompassing one or more of the following or similar uses: a. Bowling, b. Video games, c. Pool, billiards, d. Martial arts, e. Ice or roller skating rink, 4. Personal fitness or sports training center with primary location of facilities and equipment enclosed within a structure, 5. Dancehall or facility for dance instruction, 6. Other indoor recreation uses which are found by the City Council or Planning Commission to be of similar intensity and characteristics of use to those enumerated in this subsection. - - CUP - PC 1323 - 92 - Zoning Districts OS PR FP Uses R. Subsidiary Uses: 1. Competition and tournament facilities, including stadium seating, concession stands and box office/ticket sales for on-premises events only, 2. Restaurant without separate bar facility, 3. Repair shop, servicing equipment associated with the activities authorized under the principal use permit, 4. Retail sales of equipment and supplies customarily associated with the activities authorized under the principal use permit, 5. Caretaker’s or security officer’s residence 6. Other uses deemed by the Planning Commission or City Council to be subsidiary to the principal use authorized on the site. - - CUP - PC S. Card Clubs and similar businesses operating games of chance - - Ex T. Nightclubs - - Ex U. Other uses which are found by the Director of Community Development to be in conflict with the objective of the FP zoning district - - Ex Key: P – Permitted Use - – Not Allowed CUP – Admin. – Conditional Use Permit issued by the Director of Community Development CUP – PC – Conditional Use Permit issued by the Planning Commission CUP – CC – Conditional Use Permit issued by the City Council Ex - Excluded Uses 1324 - 93 - CHAPTER 19.144: DEVELOPMENT AGREEMENTS Section 19.144.020 Purpose of Development Agreement. 19.144.030 Authority for Adoption. 19.144.040 Application Requirements. 19.144.050 Qualification as an Applicant. 19.144.060 Proposed Form of Development Agreement. 19.144.070 Contents of a Development Agreement. 19.144.080 Consistency with General and Specific Plans. 19.144.090 Public Hearing and Ordinance Required. 19.144.110 Findings. 19.144.120 Irregularity in Proceeding. 19.144.140 Time for and Initiation of Review. 19.144.150 Finding of Compliance–Appeal. 19.144.160 Finding of Noncompliance–Appeal. 19.144.170 Appeal of Determination. 19.144.190 Cancellation or Modification by Mutual Consent. 19.144.200 Cancellation by the City. 19.144.210 Rights of the Parties after Cancellation or Termination. 19.144.220 Rules Affecting Development Agreement. 19.144.230 Separate Procedure. 19.144.240 Effect of Development Agreement. 19.144.250 Construction. 19.144.260 Execution and Recordation of Development Agreement, Amendment or Cancellation. 19.144.270 Judicial Review–Time Limitation. 19.144.010 Findings and Declaration of Intent. A. The California Legislature in Section 65864 of the Government Code has found that the lack of certainty in the approval of development projects can result in a waste of resources, escalate the cost of housing and other development to the consumer, and discourage investment in and commitment to comprehensive planning which would make maximum efficient utilization of resources at the least economic cost to the public. The City Council finds and determines that under appropriate circumstances, development agreements will 1325 - 94 - strengthen the public planning process, encourage private participation in comprehensive planning by providing a greater degree of certainty in that process, reduce the economic costs of development, allow for the orderly planning of public improvements and services and the allocation of costs therefor in order to achieve the maximum utilization of public and private resources in the development process, and assure, to the extent feasible, that appropriate measures to enhance and protect the environment of the City are achieved. . The City Council further finds that the lack of public facilities, including, but not limited to, streets, sewerage, transportation, drinking water, school, and utility facilities, is a serious impediment to the development of new housing. B. The City Council further finds and determines that the public safety, health, convenience, comfort, prosperity and general welfare will be furthered by the adoption of this chapter in order to provide a mechanism for the enactment of development agreements to accomplish the foregoing purposes and aims and the realization of the benefits. 19.144.020 Purpose of Development Agreement. Development agreements enacted pursuant to this chapter are to ensure to the applicant for a development project that upon approval of the project, the applicant may proceed with the project in accordance with existing policies, rules and regulations, and subject to specified conditions of approval, in order to implement the intent of the City Council in enacting this title. Development agreements will also ensure that all conditions of approval, including the construction of off-site improvements made necessary by such land developments, will proceed in an orderly and economical fashion to the benefit of the City. 19.144.030 Authority for Adoption. This chapter is adopted under the authority of Government Code Sections 65864 through 65869.5. 19.144.040 Application Requirements. An application for a development agreement shall include, in addition to the requirements of Chapter 19.12, Administration, a development agreement proposal as described in 19.144.060, Proposed Form of Development Agreement. 19.144.050 Qualification as an Applicant. A. Only a qualified applicant may file an application to enter into a development agreement. The Director of Community Development shall require an applicant to submit proof of his or her interest in the real property and of the authority of the agent to act for the applicant. This proof may include a title report, policy or guarantee, issued by a title company licensed to do business in the State evidencing the requisite interest of the applicant in the real property. B. Other Parties. In addition to the City and developer, any federal, State or local governmental agency or body may be included as a party to any development agreement. Any additional party shall be made a party to the development agreement pursuant to the provisions of the Joint Exercise of Powers Act (Government Code Section 6500, et seq.) providing for joint powers agreements, or provisions of other applicable federal, State or local law, in order to create a legally binding agreement between such parties. 1326 - 95 - 19.144.060 Proposed Form of Development Agreement. Each application shall be accompanied by the form of development agreement proposed by the City. This requirement may be met by designating the City’s then standard form of development agreement as prepared by the City Attorney and including specific proposals for changes in or additions to the language of the standard form. The City’s Proposed Form of Development Agreement shall include the following: A. The parties to the development agreement; B. The nature of the applicant’s legal or equitable interest in the real property constituting such applicant as a qualified applicant under this chapter; C. A description of the development project sufficient to permit the development agreement to be reviewed under the applicable criteria of this chapter. Such description may include, but is not limited to, references to site and building plans, elevations, relationships to adjacent properties and operational data. Where appropriate, such description may distinguish between elements of the development project which are proposed to be fixed under the development agreement, those which may vary and the standards and criteria pursuant to which the same may be reviewed; D. An identification of the approvals and permits for the development project enacted to the date of or contemplated by the development agreement; E. The duration of the development agreement; F. The permitted uses of the property; G. The maximum height and size of the proposed buildings, and provisions for dedications of land for public purposes; H. A program and criteria for periodic review under this chapter; I. Appropriate provisions guaranteeing or securing performance of the development agreement on the part of the developer; J. Specific standards for periodic review of a development agreement; K. Specific standards to insure compliance by the parties to a development agreement; L. The Development Agreement may provide that construction shall be commenced within a specified time and that the project or any phase shall be commenced within a specified time and that the project and any phase be completed within a specified time. M. Information required in accord with Section 19.140.070, Content of a Development Agreement; N. Any other relevant information which may be deemed necessary by the Director of Community Development pursuant to this chapter. 1327 - 96 - 19.144.070 Contents of a Development Agreement. A. A development agreement shall specify its duration, the permitted uses of the property , the density and/or intensity of use, the maximum height and size of proposed buildings, and provisions for reservation or dedication of land for public purposes. B. A development agreement shall attach and incorporate by reference all conditions of approval imposed by the City with respect to the development project. C. All development agreements shall contain an indemnity and insurance clause in form and substance acceptable to the City Attorney, requiring the developer to indemnify the City against claims arising out of the development process and limiting the developer’s sole remedy to specific performance and thereby eliminating any potential damages to be paid by the City under the development agreement; provided, that, these provisions do not violate applicable law or constitute a joint venture, partnership or other participation in business affairs of developer by the City. D. All development agreements, or any part of development agreements, may be subject to subsequent condemnation proceedings by the City. E. Community Benefits: At the discretion of the City Council, additional heights over the base height standard in gateways and nodes identified in the Special Areas Map (Fig. X of the General Plan) may be approved as shown in the Community Form Map (Fig. Y of the General Plan). In order to obtain additional height, a development should include the following community benefits. 1. Ground floor retail component; and 2. One or more of the following benefits equivalent to at least 15% of the increase in value of the site attributed to the increase in height, based on a pro-forma, prepared by the developer and peer-reviewed by the City. The cost to the City of the peer-review shall be paid for by the developer: a. Transportation and Mobility Improvements i. New or expanded bicycle and pedestrian facilities; ii. Transit improvements and/or amenities including adaptive traffic signal management systems; iii. Participation in a community shuttle program (to provide connections to major employment and community nodes, including community facilities and shopping). b. Public Entity or Facilities: Provide land or space for public entities, such as the City or schools. c. Senior Housing. Provide at least 15% of housing for seniors, if the proposed project includes a residential component and is not already targeted towards seniors. d. Public Art and Cultural Facilities i. Construction of a new, or expansion to, a community facility (e.g. recreation center, teen facility, etc.) CONFORMANCE WITH GENERAL PLAN 1328 - 97 - ii. Construction of a new, or expansion of, a community gathering space (e.g. meeting/conference space, cultural center or museum). e. Parks and Open Space i. New publicly accessible park and/or open space within a project in excess of park dedication requirements. ii. Dedication of land for a new or expanded park outside the project boundary in excess of park dedication requirements. f. Cash-in-Lieu Contribution. A Cash-in-Lieu contribution is a contribution made to the City by a developer or applicant and is equivalent to at least 15% of the increase in value of the site attributed to the increase in height achieved through the Community Benefits Program. The funds are allocated exclusively for purchase of land, capital improvements or operations related to items a, b, d, e, and towards the construction of affordable housing. All Cash-in-Lieu Contributions shall be made to the City. D. 19.144.080 Consistency with General and Specific Plans. Before the City Council may approve the development agreement, it must find that its provisions are consistent with the General Plan and any applicable specific plans of the City. If the City Council approves the development agreement in the form recommended by the Planning Commission, without further findings, then it shall be deemed to have also adopted the findings of the Planning Commission. 19.144.090 Public Hearing and Ordinance Required. A development agreement is a legislative act and shall be enacted by ordinance only after a public hearing before the City Council. The ordinance shall refer to and incorporate by reference the text of the development agreement. 19.144.110 Findings. A. Development Agreement shall be enacted by ordinance by the City Council upon making the following findings: B. Is consistent with the objectives, policies, general land uses and programs specified in the General plan and any applicable specific plan; C. Is compatible with the uses authorized in, and the regulations prescribed for, the land use district in which the real property is or will be located; D. Is in conformity with and will promote public convenience, general welfare and good land use practice; E. Will not be detrimental to the health, safety and general welfare; F. Will not adversely affect the orderly development of property or the preservation of property values; and 1329 - 98 - G. Will promote and encourage the development of the proposed project by providing a greater degree of requisite certainty. 19.144.120 Irregularity in Proceeding. Formal rules of evidence or procedure which must be followed in a court of law shall not be applied in the consideration of a proposed development agreement under this chapter and the provisions of Chapter 19.12, Administration, shall provide the procedure for such consideration. No action, inaction or recommendation regarding the proposed development agreement shall be held void or invalid or be set aside by a court on the ground of the improper admission or rejection of evidence or by reason of any error, irregularity, informality, neglect or omission (“error”) as to any matter pertaining to the application, notice, finding, record, hearing, report, recommendation, or any matters of procedure whatever unless after an examination of the entire case, including the evidence, the court finds that the error complained of was prejudicial and that by reason of the error the complaining party sustained and suffered substantial injury, and that a different result would have been probable if the error has not occurred or existed. There is no presumption that error is prejudicial or that injury resulted if error is shown. 19.144.140 Time for and Initiation of Review. The Director of Community Development shall review the development agreement annually in order to ascertain the good faith compliance by the developer with its terms. The Developer shall submit documentation as required by the Director of Community Development to demonstrate good faith compliance by the developer of the terms of the development agreement. The time for review may be modified by the City Council at any time upon reasonable notice to the developer, and the development agreement may prescribe a procedure and standards and different times for review of compliance with its terms; provided, however, that a development agreement shall in any event be reviewed for compliance at least once every twelve months. 19.144.150 Finding of Compliance–Appeal. If the Director of Community Development finds good faith compliance by the developer with the terms of the development agreement, he or she may issue a certificate of compliance, which shall be in recordable form and may be recorded by the developer in the official records. The issuance of a certificate of compliance by the Planning Director and the expiration of the appeal period hereinafter specified without appeal, or the confirmation by the City Council of the issuance of the certificate on such appeal, shall conclude the review for the applicable period and such determination shall be final. 19.144.160 Finding of Noncompliance–Appeal. If the Planning Director, on basis of substantial evidence, finds the developer has not complied in good faith with the terms of the development agreement, he or she may specify in writing to the developer the respects, in which developer has failed to comply. The Director of Community Development shall also specify a reasonable time for the developer to meet the terms of compliance. If such areas of noncompliance are not perfected within the reasonable 1330 - 99 - time limits as prescribed, the development agreement shall be subject to modification or cancellation by the City Council. 19.144.170 Appeal of Determination. Any interested person may file an appeal of the issuance of a certificate of compliance to the City Council within ten days after the certificate’s issuance. The developer may also file an appeal to the City Council of the finding of the Director of Community Development of noncompliance within ten days after the giving of notice of such determination. All appeals before the City Council shall be conducted pursuant to a noticed hearing in the same manner as any other appeal before the City Council, at which evidence shall be taken and findings made. 19.144.190 Cancellation or Modification by Mutual Consent. Any development agreement may be canceled or amended by mutual consent of the parties, but only in the manner provided in California Government Code Section 65868. Any proposal to cancel or amend a development agreement shall be heard and determined in accordance with the same procedures specified by this chapter for approval of a development agreement. 19.144.200 Cancellation by the City. A. The City Council shall conduct a noticed hearing on the recommendations of the Director of Community Development at which the developer and any other interested person shall be entitled to submit evidence and testimony as may be germane to the issue of the developer’s good faith compliance with the terms of the development agreement. If the City Council finds, based on substantial evidence, noncompliance with the terms and conditions of the development agreement, it may either cancel the development agreement upon giving sixty days’ notice to the developer, or in its discretion, may allow the development agreement to be continued by imposition of new terms and conditions intended to remedy noncompliance. The City Council may impose conditions to the action it takes as it considers necessary to protect the interests of the City. The decision of the City Council shall be final. B. Any cancellation or imposition of new terms and conditions pursuant to this section shall be noticed in accordance with the procedures specified in Chapter 19.12, Administration of this code. 19.144.210 Rights of the Parties after Cancellation or Termination. In the event that a development agreement should be canceled, or otherwise terminated, unless otherwise agreed, all rights of the developer, property owner or successors in interest under the development agreement shall terminate. Any and all benefits, including money or land, received by the City shall be retained by the City. Notwithstanding the above provision, any termination of the development agreement shall not prevent the developer from completing and occupying a building or other improvements authorized pursuant to a valid building permit previously approved by the City or under construction at the time of termination, but the City may take any action permitted by law to prevent, stop, or correct any violation of law occurring during and after construction, and the developer or any tenant shall not occupy any portion of the project or any building not authorized by a previously issued building permit. As 1331 - 100 - used herein, “construction” means work under a valid building permit, and “completing” means completion for beneficial occupancy for developer's use, or if a portion of the project is intended for use by a lessee or tenant, then for such portion “completion” means completion except for interior improvements such as partitions, duct and electrical runouts, floor coverings, wall coverings, lighting, furniture, trade fixtures, finished ceilings, and other improvements typically constructed by or for tenants of similar buildings. All such uses shall, to the extent applicable, be deemed nonconforming uses and shall be subject to the nonconforming use provisions of the planning code. 19.144.220 Rules Affecting Development Agreement. All development agreements shall be subject to the regulation and requirements of the laws of the State, the Constitution of the United States and any codes, statutes or executive mandates and any court decisions, State or federal. In the event that any such law, code, statute, mandate or decision made or enacted after a development agreement has been entered into prevents or precludes compliance with one or more provisions of the development agreement, then such provisions of the development agreement shall be modified or suspended in the manner and pursuant to the procedures specified in the development agreement, as may be necessary to comply with such law, code, statute, mandate or decision. 19.144.230 Separate Procedure. All development agreements entail and consist of a separate procedure from other land use planning procedures and shall not take the place of the zoning ordinances, the General Plan, planned development permits, development permits, conditional use permits, subdivision approvals, building permits or any other City planning functions. If so specified in the development agreement, it shall constitute an approval pursuant to such planning procedures as if separately enacted under other City planning ordinances. To the extent practicable, public hearings on a proposed development agreement shall be held concurrently with the public hearings on all related land use approvals and all such approvals shall be made concurrently with the approval of the development agreement. 19.144.240 Effect of Development Agreement. When approved, the development agreement and any development control maps and all notations, references and regulations which are a part of the development agreement shall be part of the development agreement ordinance. Development control maps include, but are not limited to, regulations intended to carry out any plan respecting location or type of activities; height, bulk, siding or design of structures; location or design of open areas; and landscaping and other comparable regulations. 19.144.250 Construction. This chapter and any subsequent development agreement shall be read together. With respect to any development agreement enacted under this chapter, any provision of such a development agreement which is in conflict with this chapter shall be void. Unless otherwise provided by the development agreement, the City’s rules, regulations and official policies governing permitted uses of the land, governing density and governing design, improvement 1332 - 101 - and construction standards and specifications applicable to development of the property subject to a development agreement shall be those City rules, regulations and official policies in force at the time of the approval of the development agreement by the City Council; provided, however, that the developer is subject to all increases in City imposed fees and charges with respect to subsequent applications for development and construction within the property subject to a development agreement. 19.144.260 Execution and Recordation of Development Agreement, Amendment or Cancellation. A. Within ten days after the ordinance approving the development agreement takes effect, the City Council shall execute the development agreement, and the City Council Clerk shall have the development agreement recorded with the County Recorder. B. If the parties to the development agreement or their successors in interest amend or cancel the development agreement as provided in Government Code Section 65868, and this chapter, or if the City Council terminates or modifies the development agreement as provided in Government Code Section 65865.1 and this chapter for failure of the developer to comply in good faith with the terms or conditions of the development agreement, the City Council Clerk shall, after such action takes effect, have notice of such action recorded with the County Recorder. 19.144.270 Judicial Review–Time Limitation. Any action or proceeding to attack, review, set, set aside, void or annul, any decision of the City pursuant to this chapter shall not be maintained by any person unless the action or proceeding is commenced within ninety days after the date of decision as provided in Section 1094.6 of the Code of Civil Procedure, State of California. 1333 - 102 - CHAPTER 19.172: BELOW MARKET RATE HOUSING PROGRAM Section 19.172.030 BMR Program Administration 19.172.010 Purpose 19.172.020 Below Market Rate (BMR) Housing Program Requirements 19.172.030 BMR Program Administration 19.172.010 Purpose The purpose of this chapter is to: A. Encourage the development and availability of housing affordable to a broad range of households with varying income levels within the city as mandated by State Law, California Government Code Sections 65580 and the City of Cupertino’s General Plan, including its Housing Element. B. Promote the city's goal to add affordable housing units to the city's housing stock in proportion to the overall increase in new jobs and market rate housing units. C. Mitigate the need for affordable housing created by new market-rate housing development and ensure that market-rate housing development does not utilize all land available in the city for affordable housing. D. Mitigate environmental and other impacts that accompany new residential and commercial development by protecting the economic diversity of the city's housing stock, with the goal of reducing traffic, transit and related air quality impacts, promoting jobs/housing balance and reducing the demands placed on transportation infrastructure in the region. E. Increase the supply of for-sale and rental housing for families and individuals employed in Cupertino whose incomes are insufficient to afford market rate housing. Since the historical rate of production of affordable housing in the city, by private developers is very low, the BMR program is essential to meet the city's need for affordable housing. 19.172.020 Below Market Rate (BMR) Housing Program Requirements A. Developers of housing development projects must comply with the requirements set forth in Residential Housing Mitigation Program of the City of Cupertino’s Housing Element of the General Plan. B. To the extent permitted by law, the City’s objective is to obtain actual affordable housing units within each development rather than off-site units or mitigation fee payments. Provision of off-site units, land donation, or payment of Housing Mitigation Fees may only be permitted as specified in the Residential Housing Mitigation Program rules and regulations. CONFORMANCE WITH GENERAL PLAN 1334 - 103 - 19.172.030 BMR Program Administration A. The City Council shall adopt rules and regulations consistent with the provisions of this chapter and the Housing Element for the purpose of carrying out the administration of the Residential Housing Mitigation Program. Such rules and regulations shall address, but are not limited to, program eligibility requirements, affordable housing cost, income limits, preferences for housing applicants, minimum occupancy limits, waiting list procedures, buyer selection procedures, methodology for the calculation of affordable housing cost and affordable rent, resale restrictions and reasonable accommodations for disable applicants. The rules and regulations shall also address Residential Housing Mitigation Program components such as the provision of rental BMR units in for-sale housing developments or off-site BMR units. A copy of such policies, rules and regulations shall be on file and available for public examination in the office of the city clerk. B. Failure or refusal to comply with any such rules, regulations or agreements promulgated under this section shall be deemed a violation of this chapter. CONFORMANCE WITH GENERAL PLAN 1335  &,7<2)&83(57,12+($572)7+(&,7<63(&,),&3/$1 /$1'86(0$3 *S o u t h D e A n z a B o u l e v a r d S p e c i a l A r e a – A l l p r o p e r t i e s w i t h f r o n t a g e e x c l u s i v e l y o n S o u t h D e A n z a B o u l e v a r d an d T o w n C e n t e r d e v e l o p m e n t a r e n o t r e q u i r e d t o i n s t a l l H e a r t o f t h e C i t y s t r e e t s c a p e f e a t u r e s , h o w e v e r , t h e y ar e r e q u i r e d t o c o n f o r m t o t h e a r c h i t e c t u r a l a n d s i t e d e s i g n g u i d e l i n e s o f t h e S p e c i f i c P l a n . LE G E N D He a r t o f t h e C i t y S p e c i f i c P l a n A r e a B o u n d a r y So u t h D e A n z a B o u l e v a r d C o n c e p t u a l P l a n A r e a So u t h D e A n z a B o u l e v a r d S p e c i a l A r e a * Ci t y C e n t e r S u b - A r e a So u t h V a l l c o M a s t e r P l a n A r e a )LJXUH+HDUWRIWKH&LW\$UHDDQG6SHFLDO&HQWHUV0DS *P r o p e r t i e s w i t h f r o n t a g e e x c l u s i v e l y o n S o u t h D e A n z a B o u l e v a r d ( n o t i n c l u d i n g C i t y C e n t e r n o r t h ) ar e n o t r e q u i r e d t o i n s t a l l H e a r t o f t h e C i t y s t r e e t s c a p e f e a t u r e s . F o r t h e s e p r o p e r t i e s , t h e s e t b a c k sh a l l b e c o n s i s t e n t w i t h t h e S o u t h D e A n z a B o u l e v a r d C o n c e p t u a l P l a n . UPDATE MAP FOR CONFORMANCE WITH DRAFT GENERAL PLAN 1336  &,7<2)&83(57,12+($572)7+(&,7<63(&,),&3/$1 2 %)12/.4GU )LJXUH+HDUWRIWKH&LW\$UHD DQG6SHFLDO&HQWHUV=RQLQJ0DS :HVWHUO\3RUWLRQ )LJXUH+HDUWRIWKH&LW\$UHD DQG6SHFLDO&HQWHUV=RQLQJ0DS (DVWHUO\3RUWLRQ 67 ( / / , 1 *  5 2 $ ' '($1=$ &2//(*( 67(9(16&5((.%/9' UPDATE MAP FOR CONFORMANCE WITH DRAFT GENERAL PLAN AND HOUSING ELEMENT 1337  &,7<2)&83(57,12+($572)7+(&,7<63(&,),&3/$1 '(9(/230(1767$1'$5'6$1''(6,*1*8,'(/,1(6 DEVELOPMENT STANDARDS AND DESIGN GUIDELINES Background 7KH'HYHORSPHQW6WDQGDUGVDQG'HVLJQ *XLGHOLQHVFRQWDLQHGLQWKLV(OHPHQWSURYLGH UHJXODWRU\VXSSRUWIRUWKH6SHFLILF3ODQ¶VODQG XVHSROLFLHV7KH\DUHLQWHQGHGWRSURPRWHKLJK TXDOLW\SULYDWHVHFWRUGHYHORSPHQWHQKDQFH SURSHUW\YDOXHVDQGHQVXUHWKDWERWKSULYDWH LQYHVWPHQWDQGSXEOLFDFWLYLW\FRQWLQXHVWR EHDWWUDFWHGWRWKH6WHYHQV&UHHN%RXOHYDUG FRUULGRU Development Standards 1.01.010 Description $YDULHW\RIGLIIHUHQWW\SHVRIFRPPHUFLDO GHYHORSPHQWIURPVWDQGDORQHVLQJOHWHQDQW EXLOGLQJVWRVPDOOFRQYHQLHQFHFHQWHUVRIILFH EXLOGLQJVDQGODUJHVKRSSLQJFHQWHUVPD\EH SURSRVHG 3URSHUWLHVZLWKIURQWDJHH[FOXVLYHO\RQ6RXWK 'H$Q]D%RXOHYDUGLQWKH+HDUWRI&LW\6SHFLILF 3ODQDUHDDUHUHTXLUHGWRFRQIRUPWRWKHDUFKL WHFWXUDODQGVLWHGHVLJQJXLGHOLQHVRIWKH6SHFLILF 3ODQ 1.01.020 Land Use and Zoning – Permitted and Conditional Uses 7KH]RQLQJDQGODQGXVHVIRUSURSHUWLHVVKDOO FRPSO\ZLWKWKHODQGXVHDQG]RQLQJPDSVLQ )LJXUHVDQG'HYHORSPHQWUHJXODWLRQVIRU SURSHUWLHVZLOOEHDVIROORZV $&RPPHUFLDO±$OO3HUPLWWHGDQG &RQGLWLRQDO8VHVLQDFFRUGDQFHZLWKWKH =RQLQJ2UGLQDQFHUHJXODWLRQVRIWKH&LW\¶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±DWDPD[LPXPGHQVLW\RI WZHQW\ILYH  XQLWVSHUDFUHH[FHSW ZKHUHRWKHUZLVHLQGLFDWHGRQWKHODQGXVH DQG]RQLQJPDSVDQGLQWKH*HQHUDO3ODQ )RUPL[HGUHVLGHQWLDODQGFRPPHUFLDO GHYHORSPHQWVUHVLGHQWLDOGHYHORSPHQW VKDOOEHEDVHGRQQHWGHQVLW\H[FOXGLQJ SDUNLQJDQGRUODQGDUHDVGHYRWHGWRWKH FRPPHUFLDOSRUWLRQRIWKHGHYHORSPHQW INSERTTEXT: “Residential density shall be per the General Plan Land Use and zoning maps. On sites with a mixed-use residential designation, residential is a permitted use only on Housing Element sites. Conditional use permits will be required for residential units on mixed-use Housing Element sites that propose units above the estimates in the Housing Element, and on Non- Housing Element mixed-use sites.” CONFORMANCE WITHDRAFT GENERALPLAN 1338  &,7<2)&83(57,12+($572)7+(&,7<63(&,),&3/$1 '(9(/230(1767$1'$5'6$1''(6,*1*8,'(/,1(6 7KHIROORZLQJLVDQLOOXVWUDWLRQRIKRZQHW GHQVLW\LVFDOFXODWHG ‡*URVVORW DFUH VTIW  ‡&RPPHUFLDOEXLOGLQJDUHD VTIW ‡6XUIDFHSDUNLQJDUHDIRU FRPPHUFLDODUHD VTIW XQLVL]HVSDFHV#VTIW  ‡$OORZDQFHIRURXWGRRURSHQODQGVFDSLQJ DUHD RIFRPPHUFLDOEXLOGLQJDQG SDUNLQJDUHD  VTIW ‡7RWDODUHDIRUFRPPHUFLDOSRUWLRQRI GHYHORSPHQW VTIW ‡5HPDLQGHUDUHD VTIW  DFUHV ‡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uilding Height, Setbacks and Orientation $+HLJKW±DVPHDVXUHGIURPVLGHZDONWRWRS RIFRUQLFHSDUDSHWRUHDYHOLQHRIDSHDNHG URRIVKDOOEHDVIROORZV 0D[LPXP±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±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•CUPERTINO,CA 95014-3255 C U P E RT 1 N Q 408)777-3308• FAX(408}777-3333 PLANNING COMMISSION STAFF REPORT Agenda Item No.1 Agenda Date: September 9,2014 Application:GPA-2013-01, GPA-2013-02, Z-2013-01 and MCA-2014-01 (EA-2013-03) Applicant:City o.f.Cupertino Property Location:City-wide SUBJECT Study Session on the Final Environmental Impact Report (EIR) for the proposed General Plan Amendment, Housing Element Update, and associated Rezoning Project. IZECOMMENDED ACTION Staff recommends that the Planning Comrnission receive this report andcommentson the Final EIR. The Final EIR consists of the Response to Comments (RTC) Document, published in August 2014(Attachment 1), and the Draft EIR published in June 2014 (Attachment 2). This is a study session andnoaction is required at this time. DISCUSSION Background. On August 21, 2012, the City Council directed staff to evaluate reple.nishing citywide office, commercial, and hoteldevelopment allocation. During the same time frame, several property owners, including some owners within the Vallco Shopping District, approached the City about poten#ial General Plan amendments to allowfuture development of their properties. In order to comprehensively evaluate citywide needs and individual sites, in early 2013, the City Council directed staff to combine these individual requests into one comprehensive General Plan Amendment. In addition, in November 2013, the City initiated a process to update the State-mandated Housing Element of the General Plan. The Housing Element, which is a required component of the GeneralPlan, identifies appropriate locations and policies forfuture housing in Cupertino. 1340 General Plan Amendment,Housing Element Update,and associated Rezoning September 9,2014 Page 2 The City Council decided tocombine the Housing Element Update process with the General Plan Amendment process so the City and co.mmunity could fully evaluate and discuss mobility, urban design, economic development, and housingoptions in one comprehensiveoutreach and planning process. The General Plan Amendment process has involved extensive community discussionsand input provided during several public meetings, workshops, study sessions, and through online comment forms and surveys. The proposed Project considers citywide land use, urban design, mobility, and economic development choices but is not a complete revision of the City's 2000- 2020 General Plan. Environmental Impact Re ort The California Environrnental Quality Act (CEQA) requires that all State and localgovernments consider the phys.ical changes that result asa consequence of projects over which they have discretionary authority. A Final EIR f.or the Project has been prepared in acco.rdance with the requirements of the California Environmental Qual.ity Act (CEQA). The purpose of theEIR is not to recommend approvalor denial of a project but to provide information to be used in the planning and decision-making process. CEQA requires decision makersto balance the benefits of a proposedproject against the environmental effects, along with other factors. The EIR for the proposed Projectevaluates three land use alternatives (Alternative A, B and C) for a focused GeneralPlan Amendment. Proposed alternatives consist of options for city-wide development allocations (office, commercial, hotel, and residential), as well as building heights anddensities forMajor Mixed-Use Special Areas, seven Study Areas, and Other Special Areas. The proposed land use alternatives and changes to the General Plan goals, policies and strategies would require amendments to the City of Cupertino 2000-2020 GeneralPlan adopted by the City Council on November 15, 2005. CEQA Project Alternative C includes the maximum development intensity considered; therefore, for purposes of studying the significantenvironmental impacts of the proposed General Plan Amendment and Housing Element Update, Alternative C is the proposed Project for purposes of the EIR. In this Alternative, the new growth for the 2040 horizon year studied is 4,040,231 square feet of office space, 1,343,679 square feet of commercial space, 1,339 hotel rooms, and 4,421 residential units. T'he proposed Project could result in up to 12,9981 new residents and 16,855 new jobs.z Population is calculated by multiplying the number of residential units times 2.94 persons per household,which is the ABAG 2040 estimated generation rate. z Jobs are calculated applying the City's generation rates as follows; C4040231.sq. ft. 1 ( 1343679 sq.ft. 1 ( 1.339 rooms 300 sq.ft./employee)+\450sq.ft./employeeJ+\0.3 employeeJroom ` 13,467+2,986+402=16,855Jobs 1341 GeneralPlan Amendment,Housing Element Update,and associated Rezoning September 9,2014 Page 3 Under the proposed Project, the total 2040 build.out (existing conditio.ns p.lus proposed Project) would be as follows: Office: 12,970,005 square feet Commercial: 5,073,248 square feet Hotel: 2,429 rooms Reside.ntial: 25,820 units Population: 71,300 jobs:44,242 Table 1 provides a summary of the total developmentallocation projections in Alternative C. TABLE 1 ALTERNATIVE C (PROPOSED PROJECT) SUMMARY—ALL PROJECT COMPONENTSDEVELOPMENT ALLOCATIONS Remaining Proposed Allocation Project Difference SpecialAreas including Gateways/Nodes along major transportation corridors,Study Areas and Housing Element Sitesa Office 17,113 sf 3,290,000 sf 3,272,887 sf Cornmercial 695,629 sf 1,250,000 sf 554,371 sf Hotel 339 room 1,339 rooms 1,000 rooms Residential 1,416 units 3,900 units 2,84 units Other Special Areas inclnding Neighborhoods and Non-Residential/Mixed-Use Special Areas and Housing Element Sitesb Office 523,118 sf 750,231 sf 227,113 sf Commercial 5,784 sf 93,679 sf 87,895 sf Hotel 0 rooms 0 rooms 0 rooms Residential 479 units 521 units 42 units Total Built/ AP roved f..fice 8,929,774 sf. 540,231. sf 4,040,231 sf 3,500,000 sf Commercial 3,729,569 sf 701,413 sf 1,343,679 sf 642,266 sf Hotel 1,090 rooms 339 rooms 1,339 rooms 1,000 rooms Residential 21,399 units 1,895 units 4,421 units 2,526 units Note:sf=square feet a. Includes Homestead,North Vallco Park,Heart of the City,North De Anza,and South De Anza MajorMixed-Use Special Areas. b. Includes Bubb Road Mixed-Use Special Area,Monta Vista Village,OtherCommercial/Mixed-Use Special Areas,Othe.r Neighborhoods,Major Employers Catego.ry,and Housing Element Sites. c. Net new commercial is not proposed.This number assumes that the existingVallco Shopping Mall square footage(1,267,601.s will be demolished and will go back into the City-wide camrnercial allocation pool.A total of 625,335 sf would be reserved for a future projectin the Vallco district. Source:City of Cupertino,2014. 1342 GeneralPlan Amendment,Housing Element Update,and associated Rezoning September 9,2014 Page 4 The EIR al.so studies an update to the Gene.ral Plan's Housing El.ement to accommodate the Regional Housing Needs Allocation (RHNA) for the 2014-2022 planning period and meet the City's fair-share housing obligationof 1,064 units. As part of this process, the following zoning amendments would be made: Chapter 19.56 (Density Bonus) will be arnended to be consistent with the 2007-2014 Housing Element Pr.ogram 12 (Density Bo.nus Program); Chapter 19.20 (Permitted, Conditional and Excluded Uses in Agricultural and Residential Zones), Chapter 19.76 (Public Building(BA), Quasi-Public Building (BQ) and Transportation T) Zones), and Chapter 19.92 (Park andRecreation Zones) will be amendedto ensure conformance with SB 2 requirements pertaining to the permanent emergency shelters; Chapter 19.20 (Permitted, Conditional and Excluded Uses in Agricultural and Residential Zones) will also be amended to be consistent with the State Employee HousingAct with respect to farmworker housing and employee housing. Changes proposed to the GeneralPlan Land Use Map, Zoning text and Zoning map are proposed to achieve internal consistency as a result of changes to the following: Housing Elementpoliciesthat are (1) required by State Law or (2) adopted by the City Council as a result the Project, Changes toGeneral Plan Policy to address changes requ.ired as a result of recently adopted State Law (such as Assembly Bi111358, Complete Streets) As a result of bringing non-conforming land use into conformance with theGeneral Plan and Zoning Ordinance or for formatting or reorganizing the text. Alternatives In addition to the CEQA-required No Project alternative, the EIR also includes an analysis of two land use alternatives to the Proposed Project described abnve. These alternatives analyze the significantenvironmental impacts for lesser. developmentintensities than theProposed Project. The No Project alternative envisions no change to the current General Planandno changes to the remaining development alloc tion. No changes to the residentialdensity would be allowed on any property. In Alternative A, the proposed development intensity includes an increase in the office and hotel allocations but no increase in residentialallocation. No increase in commercial allocation is proposed inAlternative A. In Alternative A, it is expected that some portionsof the VallcoShopping Mall may be re-tenantedor re-purposed. Inaddition, no maximum height increases are proposed under this Alternative. Residential density would be increased in the South De Anza Specific Plan area (south of Highway 85.) In Alternative B, increases in office, hotel and residential development allocations are proposed more than those studied in Alternative A. It is expected that the existingVallco 1343 General Plan Amendment,Housing Element Update,andassociated Rezoning September 9,2014 Page 5 Shopping Mall would be demolished and returned to the commercial allocation pool. No increase in cornmercial allocation is proposed in this alternative. Under this Alternative, the proposed maximum height limits are less than those of the proposed Project. Residential density would be increased in certain areas of the City but to densities less than those proposed in the Project. The proposed development intensity in the alternatives to the proposed Project are presented in Table 2 below. TABLE 2 ALTERNATIVES COMPARISON SUMMARY BY PROPOSED NEW DEVELOPMENT ALLOCATIONS Proposed Project No Land Use Land Use Category Alternative C) Projecta Alternative A Alternative B Office 4,040,231 sf 54U,231 sf 1,040,231 sf 2,540,231 sf Commercial 1,343,679 sf 701,413 sf 701,413 sf 1,343,679 sf Hotel 1,339 rooms 339 rooms 600 rooms 839 rooms Residential 4,421 units 1,895 units 1,895 units 3,316 units Populationh 12,998 5,571 5,571 9,749 Jobs 16,855 3,461d 5,206 11,705f Notes:sf—square feet __ a.No Projectrepresents remaining development allocation under the existing 2000-2020 General Plan. b.Population iscalculated by multiplying the number of residential units studied in each alternative by 2.94 persons perhousehold,which is the ABAG 20 0 estimated generation rate. c.Jobs are calculated.applying the City's employeegeneration ra#es for each.category as follows; C4040231 sq.ft. 1 ( 1343679 sq.ft. 1 r 1339 rooms 300 sq.ft./employee/+\450 sq.ft./employeeJ+\0.3 employee/room — 13,467+2,986+402=16,855 Jobs d.Jobs are calculated applying khe City's employeegeneration rates.for each category as follows; C540231 sc.ft. 1 ( 701413 sq.ft. 1 ( 339 rooms 300 sq.ft./employeeJ+\450 sq.ft./employee/+\0.3 employee/room — 1 8 1+1,559+101=3,461 Jobs e.Jobs are calculated appl.ying the City's employee generation xates for each category as follows; C1040231 sq.ft. 1 ( 701413 sc.ft. 1 ( 600 rooms 300 sq.ft./employee/+\450 sq.ft./employeeJ+\0.3 ernployee/room — 3,467+1,559+180=5,206 Jobs f.Jobs are calculated applying the City's employeegeneration rates for each category as follows; C2540231 sq.ft. 1 ( 1343670sq.ft. 1 ( 839 rooms 1 300 sq.ft./employee/+\450 sq.ft./employee/+\0.3 employee/roomJ— g'467+2,986+252=11,705 aobs Source:City ofCupertino,2014. Pro ram EIR As described in Section 15168 of the CEQA Guidelines, program EIRs are appropriate when a project consists of a series of actions relatedto the issuance of rules, regulations, and other plan.ning criteria. In this case, this proposed Project consists of long-te.rm pla.ns that will be implemented over time as policy documents guiding future developm.ent activities and City 1344 GeneralPlan Amendment,Housing Element Update,and associated Rezoning September 9,2014 Page 6 actions. No specific development pr.ojects are proposed as part of the Project. Therefore, this EIR is a progra.m-level EIR that analyzesthe potential sig.nif.icant environme.ntal effects of adoption of the proposed Projeet. As a program EIR, the EIR prepared is not project-specific, and does not evaluate the impacts of individual projects thatmay be proposed under the GeneralPlan. However, if future, proposed activities are within scope of the effects examined in the program EIR, then additional environmentalreview rnay not be required for those future projects. (See CEQA Guidelines Section 15168[c] and CEQA streamlining provisions.) If a subsequent activity,which is not exempt from CEQA,would have effects that are not within the scope of the program EIR, then the City will prepare an environmental checklist or Initial Study to determine what form ofenvironmental review is required by CEQA, which could be a Negative Declaration, Mitigated Negative Declaration, or. a Subsequent or Supplemental EIR or. an Addendum, to secure the necessary development permits. For these subsequent environmental review documents, thisProgram EIR wi11 serve as the first-tier. environmental analysis. The program EIR can also serve to streamline future environmental review of subsequent projects. Therefore, while subsequent environmentalreview may be tiered from this EIR, this EIR is not intended to address project-specific impacts of individual projects. The growth and developmentstudied under the proposed Project would be gradual over the 26-year buildout horizonof theGeneral Plan. Therefore, while the impacts identified as a result of implementation of the proposed Project may be significant and unavoidable in the cumulative scenario (2040), even if noaction is taken or no additional growth is contemplated, regional growth, growth permitted under the provisions of the current 2000-2020 GeneralPlan, and theassociated environmental effects linked to this growth, would continue to occur resulting in sigr ificant and u.navoidable impacts. Future growth under all of the land use altematives studied in this program EIR would occur incre.mentally over approximately 26 years a.nd wou.ld be guided by a policyframework that is generally consistent with many of the principal goals and objectivesestablished in regional planning initiatives Ior the Bay Area, which concentrates new development within infill sites and near major transportationcorridors. The EIR created as a result of reviewunder CEQA must disclose the significant environmental impacts of the project and,in addition, identify the following: Significant cumulative impacts of the project in combination with past, presentand reasonably foreseeable f.uture projects; Mitigation measures and alternatives to reduce these effects; Significant impacts that cannot be avoided; Growth-inducing impacts;and Effects found not to be significant. Prior to approving the proposed Project, the Planning Commission must decide whether to recommendthat the City Council certify that the Final EIR was prepared in compliance with 1345 GeneralPlan Amendment,Housing Element Update,and associated Rezoning September 9,2014 Page 7 CEQAand whethe.r to recommend that the City Council approve the GeneralPlan Amendment, Housing Element Update, and associated Rezo.ning. The Commissi.on's recommendations will be forwarded to the City Council for final action. Since this is a study session, an action is not required at this time. The City Council will review the Final EIR for adequacy and will exercise its independent judgment regardingcertification. If the Council certifies the Final EIR, it will then consider whether to approve theGeneral Plan Amendment, Housing Element Update, and associated Rezoning. As part of this approval, findings on the feasibility of reducing or avoiding significantenvironmental effects will be made, including a Statement of Overriding Considerationsbalancing the benefits of the project against is unavoidable environntental risks. EIR Process and PublicOutreach The EIRprocess started with the issuance of the Notice of Preparation (NOP) of an EIR for the proposed Project to the Office of Planning and Research (OPR) State Cl.earinghouse, interested agencies and persons on March 5, 2014 for a 30-day review period. A public Scoping Meeting was held on Tuesday, March 11, 2014 at 5:00 p.m. atthe Cupertino Community Hall. The NOP and scoping process solicited comments from responsible and trustee agencies, as well as interestedparties regarding the scope of the Draft EIR. Appendix A, Notice of Preparation Comment Letters, of the Draft EIR containsthe NOP as well as the commentsreceived by the City in response to the NOP. The City also established a website for the Project in early 2013 where all project-related documents including the Draft EIR and commentson the Project and the EIR were posted for public review. Following the preparation of the Draft EIR, a Notice of Availability (NOA) wasissued to the OPR State Clearinghouse, interested agencies and persons, as well as the Santa Clara County C1erk-Recor.der for a .45-day review period f.rom Wednesday, June 18, 2014 throughFriday, August 1, 2014. Copies of the Draft EIR were made available for review to interestedparties at: 10 public libraries in Cupertino and the surrounding area, Cupertino City Hall at 10300 Torre Avenue, Cupertino, CA 95014, and Project's website at:http://www.cu.ertino a.or/ Postcards were mailed to all postal customers in the City of Cupertino and a notice was also published in the Cupertino Courier. A public meeting was held on Tuesday, June 24, 2014 at 5:00 p.m. at the Cupertino Community Hall to receivecomrnents on the adequacy of the Draft EIR. The public was encouraged to provide writteninput regarding the adequacy of the Draft EIR. Several comrnent letters were received during the 45-day review period of the Draft EIR. Responses to the written commentsreceived during that period regarding theadequacy of the Draft EIR have been prepared and compiled in the RTC document along with minor text revisions, corrections and clarifications to the Draft EIR. The RTC document together with the Dra.ft EIR is co.nsidered to be the Final EIR for the proposed Project. 1346 General Plan Amendment,Housing Element Update,and associated Rezoning September 9,2014 Page 8 The RTC document was posted on the Project website on August 29, 2014. T'he NOA for the Fina1 EIR has been made available at the City Hall, sent to 10 local libraries and to the agencies that commented on the Draft EIR.A notice was also published in the CupertinoCourier and an email was sent to all interested persons who had signed up through the website. Ke gnificance Findin;s And Mitigations Revised. Table 2-2, Summary of Impacts and Mitigation Measures from the RTC docurnent, along with Table 2-2 of. the Draft EIR summarize all significant Project .impacts and mitigation. measures. The list of mitigation measures does not include existing requirements (such as compliance with mandatory regulation (e.g. General Plan policies, zoningregulations) that are routinely applied to newdevelopment.Thisstaff report highlights key findings only. The EIR has identifiedmitigation measures for all significant impacts. However, even with mitigation, some significant impacts would remain significant and have been determined to be significant and unavoidable. In some cases, the significant impacts have been determined to be significant and unavoidable because the mitigation measures requireapproval from a public agency other than the City of Cupertino (e.g. the Cityof Santa Clara, Caltrans, etc.) and are not within the responsibility and jurisdiction of the City. If approval is not granted by that agency forimplementation of the mitigation measure, the significant impact would remain and would, ther.efore, be considered significant and unavoidable. In other cases, a significant impact is unavoidable because the significant impact would not be fully mitigated even though. mitigation measures have been identified to minimize/reducethe impact. A detailed discussion of the significantenvironmental impacts of the Proposed Project, as well as significant and unavoidable impacts, and mitigaHon measures and alternatives identified to lessen or avoid these impactswhere feasible is provided in the Draft EIR(Attachment 2). This section highlights key findings for cumulative impacts of the development proposed. Details are provided in theEIR. 1. Aesthetics The land use or intensity changes proposed under the Project do not represent a substantial reimagining of the character of the Project Componen# lacations including those within the I- 280 viewshed. This is primarily because the existing conditions at these locations are largely urbanized and built out. The potential future development under the proposed Project would primarily involve gradual changes in development intensity similar to existing buildings, albeit with increased building heightpotential in limited locations. New and/or intensified uses as a result of the proposed Project would be dispersed within theProject Component locationsand would occur gradually throughout the 26-year buildout horizon of the General Plan. The General Plan policies are an integral, inseparable component of the proposed Project, and amended policies under the proposed Project would not cause adverse physical changes that could create aesthetic i.mpacts in Cupertino. Individual d.evelopments would continue to be subject to General Plan policies and Municipal Code provisions. 1347 GeneralPlan Amendment,Housing Element Update,and associated Rezoning September 9,2014 Page 9 Additionally, the increases in heights are proposed in Planned Development areas where individual projects would also be subject to the Architectural and Site Review process as well as the Design Standards outlinedin the Heart of the City SpecificPlan, the South Vallco Specific Plan, and other applicableConceptual Plans to ensure that the development is aesthetically pleasing and compatible with adjoining land uses with appropriate setbacks. With the development review mechanisms in place, approved future development under the proposed Project is not anticipatedto create substantial impacts to visual resources. Moreover, certain policy changes would serve to reduce aesthetic impacts from new and existing developments. Therefore, theGeneral Plan policy amendments under the proposed Project were determined to result in less-than-significant irnpacts to aesthetics. 2. Air Quality Air pollutant emissions associated with the proposed Project would result in a cumulatively considerable contribution to air quality irnpacts. The proposed Project would support the prirnary goals of the 2010 Bay Area Clean Air Plan; however, the buildout of the proposed Project would conflict with the Bay Area Air Quality Management District (BAAQMD) Bay Area Clean Air Plan goal for ommunity-wide vehicles miles traveled (VMT) to increase at a slower rate compared to population and employrnent growth. The rate of growth in VMT would exceed the rate of population and employment growth, resulting in a substantial increase in regional criteria air pollutant emissi.ons in Cupertino. ThePlan Bay Area aims to improve transportation efficiency and .reduce regional infrastructure costs in the region. Policiesand development standards in the proposed Project would facilitate continued City participation/cooperation with BAAQMD and the Santa Clara Valley Transportation Authority (VTA) to achieve regional air quality improvement goals, prornote energyconservation designand development techniques, encourage alternative transportation modes, and implement transportation demand management strategies. In addition, future projects under the proposed Project would generate air pollutant emissions during operation and construction phases that could exceed BAAQMD's significance criteria. a. Operational Emissions: Future development under the proposed Project would result in a substantial long-term increase in criteria air. pollutants over the 26-year Gen.e.ral Plan horizon. Criteria air pollutant emissions would. be generated from on-site area sources (e.g. fuel used for landscaping equipment, consumer produ.cts), vehi.cle trips generated by the Project, and energy use (e.g. natural gas used for cooking and heating). While the General Plan includespolicies and strategies that once adopted would reduce operational emissions from development under the proposed Project to the maximum extent practicable, there are no additional measures available to mitigate this impact due to the level of growth forecast in the city. In addition, Mitigation Measure AQ-4a, for new sources ofToxic Air Contaminants (TACs), would also reduce criteria air pollutants associated with light industrial land uses within the 1348 General Plan Amendment,Housing Element Update,and associated Rezoning September 9,2014 Page 10 city. Operational emissions from future development would be determined during project-level CEQA review for futuxe projects. The total cr.iteria air pollutant emissions from operation of future development projects under the proposed Project would be substantial and would contribute to increases in concentrations of air pollutants, which couldcontribute to ongoing violationsof air quality standards. Therefore, the impact would be significant andunavoidable. b. Construction Emissions: Futureconstruction emissions associated with individual development projects under the proposed Project would generate an inerease in criteriaair pollutants and TACs. Existing federal, State, and local regulations, and policiesand strategies of the proposed Project described in the Draft EIR, protect localand regional air quality. Continued compliance with these regulations and implementation of General Plan policies and strategies, would reduce construction-related impacts to the extent feasible. However, if.uncontrolled, fugitive dust(PM o and PMzs) levels downwind of activelydisturbed areas during construction or overlapping construction activitiescould violate air quality standards or contributesubstantially to an existing or projected air quality violation and expose sensitive receptors to elevated concentrations of pollutants during constructionactivities. While Mitigation Measure AQ-2a would require adherence to the current Bay Area Air Quality Management District's basic control measures for reducing construction emissions of PM o, and Mitigation Measure AQ-2b would require adherence to BAAQMD's basic control measures for fugitive dust control and would ensure impacts from fugitive dust generated during construction activities are less than significant, applicants for future development in Cupertino could generate construction exhaust emissions in excess of the BAAQMD significance thresholds. An analysis of emissions generated from the construction of specific future projects under the Genera]. Plan would be required toevaluate emissions compared to BAAQMD's project-level significance threshol.ds during individual envi.r.onmental review. It should be notedthat the identificatio.n of these program-level impact does not preclude the finding of less-than-significant impacts for subsequentprojects that comply with BAAQMD screening criteria or meet applicable thresholds of significance. However, due to the dueto the level of growth forecast in the city and the programmatic nature oF the proposed Project, no additionalrnitigation measures are available and air quality impacts are considered significant and unavoidable. 3. Cultural Resources There are 22 recorded cultural resources within the City of Cupertino and its Sphere of Influence (SOI} that are documentedon the California Office ofHistoric Preservation's (OHP) recording forms. As of March 2011, there were 13 properties listed in the OHP's Directory of Historic Properties. Additionally, the City has identified 37 locally important cultural resources in the current General Plan. Although, most of the 37 sites have not been evaluated forlisting on the National Register or State Register, they are still recognized as sites to be protected under 1349 General Plan Amendment,Housing Element Update,and associated Rezoning September 9,2014 Page 11 thecu.rrent Gen.eralPlan. The properties considered Iocally important are unique to the lists wherethey appear, which include Commemo.rative Sites, Community Landmarks, and Sites of Historic Mention. T'he sites of HistoricMention are sites outside of the City's jurisdiction, but still recognized as locallyimportant to Cupertino. As part of the GeneralPlan Amendment, the Seven Springs Ranch, built in 1866 andlocated at 11801 Dorothy Anne Way in Cupertino, and listed onthe Office of Historic Preservation Directory Listings, would be added to the City's list of Historically Significant Resources. This sitehas been nominated for inclusion in the National Register; however, it is not currently listed in either the National Register of Historic Places or the California Register of Historical Resources. As discussed in Chapter 4.4, Cultural Resources, several of the identified historical resources are within the boundaries of some Project Componentlocations. Therefore, implementation of the proposed Project could have the potential to directly impact cultural resources, by increasing commercial, office, hotel, and residential development allocations and providing for potential new develnp.ment. However, theGeneral Plan includespolicies and strategies that, once adopted, would minimize potential impacts to historic resources. Implementation of these General Plan policies and strategies, as well as compliance with federal and State laws, would ensure future development would not be detrimental or injurious to property with cultural resources or improvements in the vicinity of property with cultural resources, and impacts were found to be less than signi cant. 4. Greenhouse Gas Emissions As explained in Chapter 4.6 of the EIR, the effects of greenhouse gas emissionson global climate change are evaluated on a cumulative basis, because no single project is large enough to result in a measurable increase in global concentrations of greenhouse gases. The EIR uses the methodology recommended by the Bay Area Air Quality Management District for evaluatng the impacts of plan-level projects like the General Plan Amendment and Housing Elernent Update. TheGeneral Plan includes polices and strategies that encourage use of alternative modes of transportation and focus new growth in mixed-use areas. The proposed Project is consistent with theobjectives of Plan Bay Area for growth within the Priority Development Areas (PDAs). Therefore, the proposed Project is consistent with the r.egional Sustainable Communities Plan - Plan Bay Area. In addition, a General Plan is a regulatory docu.ment and does not directly result in development without further approvals. Any development in the city is required to be analyzed for conformance with theGeneralPlan, zoning requirements, and otherapplicable local and state requirements; comply with the requirements ofCEQA; and obtain all necessary clearances and permits. Cornpliance with these regulations and implementation of GeneralPlan policies would ensure that the City is on a trajectorythat is consistent with statewide greenhouse gas reduction goals. Accordingly,impacts were found to be less than significant. 1350 General Plan Amendment,Housing Element Update,and associated Rezoning September 9,2014 Page 12 5. Noise As a result ofimplementation of the proposed Project and ongoing regional growth, it is anticipated that there would be substantial permanent increasesto the ambient noise levels throughout Cupertino, and that these increases would primarily result from increases to transportation-related noise, especially that of automobile traffic. The impact analysis found that there would be multiple m.ajor road segments that would experience substantialpermanent increases in ambient noise levels, including at sensitive lan.d uses. While theGeneral Plan contains numerous policies to address excessive .roadway noiseat existing sensitive land uses, whi+ch could in certain cases reduce or prevent significant increases in ambient noise at sensitive land uses due to the proposed Project, the measures described in these policies would not be necessarily be feasible in all locations or contexts. Forexample, some of the most effective naise-attenuation measures, including sound walls andberms, are inappropriate along streets with commercial or residential street frontage (due to financial and aesthetic considerations, and negative impacts to pedestrian and bicycle connectivity), and therefore would be infeasible or inappropriate in a majority of locations where sensitive land uses already exist. For these reasons, there is no feasible mitigation that would substantially reduce or avoid significant increases in arnbient noise levels, because in most cases all identified mitigations would be economically impractical, scientifically unachievable, outside the City's jurisdiction, and/or inconsistent with City planning goals and objectives. Therefo.re, the noise impacts of the Proposed Project would rernain significant andunavoidable impact. 6. Population and Housing The proposed Project would not induce a substantial amount of growth that has not been adequatelyplanned for orrequire the construction of replacernent housing elsewhere. Growth. under the proposed Project would occvr incrementally over a period of approximately 26 years and would be guided by the policy framework in the proposed Project that is generally consistent with most of the principal goals and objectives established in regional planning initiativesfor the Bay Area. One of the key concepts of Plan Bay Area isthe idea of focusing future growth into transit-oriented, infill development oppartunity areas within existing communitiesthat are expected to host the rnajority of future development. These areas are called Priority Development Areas (PDA). The PDAs in Cupertino are located along Stevens Creek Boulevard between Highway 85 and the Cityof Santa Clara, and along De Anza Boulevard between Stevens Creek Boulevard and the City of Sunnyvale. These coincide with the Heart of the City and North De Anza Special Areas, portions of the Homesteadand South De Anza Special Areas, and include three S#udy Areas and eleven poten#ial Housing Element sites. Accor.dingly, irnplementatio.n of the proposed Project would facilitate infill growth and support r.egional planning efforts. Growth due to the proposed Project together with cumulative growth 1351 GeneralPlan Amendment,Housing Element Update,andassociated Rezoning September 9,2014 Page 13 would be consistent with regional planning efforts, and would not exceed regional growth projections, displace substantialnumbers of people or housing, or exceed planned levels of growth. Therefore, the impact would be less thari significant. 7. Transportation and Traffic a. Intersection Analysis The EIR included an analysis of forty-one (4lstudy intersectioris, all ofwhich are signalized. Chapter 4.13, Transportation and Traffic, describes the traffic conditions that would result with the addition of the trips generated by the development under the proposed Project on the local roadway network, cornparedto traffic conditions with the 2040 No Project scenario. The roadway network is assumed to be the same as under the 2040 No Project scenario. The results of the Level of Service (LOS) analysis show that, of the forty-one (41) study intersections, twenty-five (25) intersections would operate at an acceptable level of service under th.e proposed P.r.oject and sixteen (16) intersections would operate at an unacceptable levelof service during the AM peak hour (7:00 a.m. — 10:00 a.m.), the PMpeak hour (4:00 p.m.— 7:00 p.m.), or both peak hours. Eleven(11) of the sixteen(16) intersections expected to operate at unacceptable LOS are included in Santa Clara County's Congestion ManagementProgram CMP). Five (5) of the sixteen (16) intersections (shown with an asterisk[*]) that would operate at an unacceptable level of service for at least one peak hour under the proposed Project were also predicted to operate at an unacceptable level of service under the No Project scenario. The following is a list of thesixteen (16) intersections that would result in a significant impact during at least one of the peak hours: Intersection(#) LOS Peak Hour 1. SR 85 Northbound Ramps&Stevens Creek Blvd(#2) (CMP) E AM 2. Stelling Road and Stevens Creek Blvd (#3) (CMP) F PM 3. *Sunnyvale-Saratoga Rd/De Anza Blvd &Homestead Rd(#5) (CNIl') F AM and PM 4. *De Anza Blvd &I-280 Northbound Ramp(#6) (CMP) F AM and PM 5. De Anza Blvd &I-280 Southbound Ramp (#7) (CMP) F AM and PM 6. *De Anza Blvd&Stevens Creek Boulevard (#8) (CMP) F PM 7. De Anza Blvd&McClel.lan Rd/Pacifica Dr(#9) F PM 8. Wolfe Rd&Homestead Rd(#16) F PM 9. *Wolfe Rd&I-280 Northbound Ramp (#18)(CMP) F AM 10. Wolfe Rd&I-280 Southbound Ramp (#19) (CMP) F AM and PM 11. *Stevens Creek Bl.vd&Wolfe Rd/Miller Ave(#21) (CMP) E+ AM 12. North Tantau Ave/Quail Ave&Homestead Rd(#24) E(E+) AM(PM) 13. Stevens Creek Blvd&Tantau Ave (#27) F PM 14. Agilent Tech Drive Way&Stevens Creek Blvd(#30)F AM 15. Lawrence Expy Southbou.nd Ramp &Stevens Creek Bl.vd (#31) (CMP)F AM 16. Stevens Creek Blvd&Lawrence Expy Northbound Ramp (#32) (CMP)F AM 1352 General Plan Amendment,Housing Element Update,and associated Rezoning September 9,2014 Page 14 b. Freeway Segment Analysis Ten (10) freeway segments were analyzed for impacts due to implementationof the Project. If the existing level of service isLOS F andthe number of net new trips added by the project is more than 1 percent of freeway capacity in that segment, there would be a significantimpact. Under the proposed Project, one(1) of the high-occupancy vehicle(HOV) lane segments and the following five(5) mixed-lane freeway segments would have significant impacts: 1. SR85 Southbound between I-280 and Stevens Creek Blvd (+2.7%). 2. I-280 Southbound betweenLawrence Exwy and Saratoga Ave(+2.2%) 3. I-280 Northbound between Saratoga Ave and Lawrence Exwy (+1.3%) 4. I-280 Northbound between Wolfe Rd and De Anza Blvd (+1.7%) 5. I-280 Northbound between De Anza Blvd and SR85 (mixed-flow lanes&HOV lane) (+1.2%) A mitigation measure has been identified toreduce impacts at these intersecdons and freeway segments. The mitigation measure requires the City to prepare and implement a Transportation Mitigation Fee Program to guarantee fundingfor roadway and infrastructure improvements that are necessary to mitigate impacts from future projects based on the then current City standards. As part of the preparation of the Transportation Mitigation Fee Program, the City shall also commit to preparing a "nexus" study toestablish nexus between the improvements identified and the fee established. The EIR identifies examples of transportation improvements and facilities that would reduceimpacts to acceptabie level of service standards and these, among other improvements, includingmultimodal improvements that reduce automobile trips and relieve congestion that could be included in the development impact fees nexus study. SR85 Northbound Rampsand Stevens Creek Boulevard (#2): An exclusive left-turri lane for the northbound leg of the intersection (freeway off-ramp) at the intersection of SR 85 and Stevens Creek Boulevard would result in one left-turn lane, one all-movement lane, and one right turn lane.The additional lane could be added within the existing Caltrans right-of-way. Stelling Road and Stevens Creek Boulevard (#3): The addition of a second exclusive left-turn lane for the eastbound leg of the intersection from Stevens Creek Boulevard to northbound Stelling Road, which could be accomplished by reworking the median. Right turns would share the bike lane. Sunnyvale-Saratoga Road/De AnzaBoulevard andHomestead Road (#5): Widen De Anza Boulevazd to four lanes in each direction or the installation of triple left-turn lanes. De Anza Boulevard and I-280 Northbound Ramp (#6): Restriping of De Anza Boulevard in the southbound direction to provide room for right turn vehiclesto be separated from throughtraffic may be required. The bike lane would be maintained, and right turns would occur from the bike lane. The right tuxns would continue to be controlled by the signal and would need to yield to pedestrians. De Anza Boulevard and Stevens Creek Boulevard (#8): Restripe westbound Stevens Creek Boulevard to provide room for right tum vehicles to be separated from through vehicles may 1353 General Plan Amendment,Housing Element Update,and associated Rezoning September 9,2014 Page 15 be required. The right turn vehicles will share the bike lane and will still be controlledby the traffic signal. Paint a bike box at the front of the lane to provide bikes a placeto wait at red lights.The pedestrian crossings will not be affected may enhance the bicycling experience. De AnzaBoulevard and McClellan Road/Pacifica Drive (#9): Realign the intersection that is currently offset resulting ininefficient signal timing such that the McClellan Road and Pacifica Drive legsare across from each othermay be required. In addition, double leftturn lanes may be required to be addedto De AnzaBoulevard with sections of double lanes on McClellan Road and Pacifica Drive to receivethe double left turn lanes. These improvements will require the acquisition of right-of-way and demolitionof existing commercial buildings. However, some existing right-of-way could be abandoned, which would reduce the net right-of-way take. Wolfe Road and Homestead Road (#16): The addition of a third southbound through lane to the southbound approach of the intersection of Wolfe Road andHomestead Road may be required, as well as the addition of a southbound exclusive right-tum lane. Three southbound receiving lanes on the south side of the intersection currently exist. An additional westbound through lane for a total of three through-movement lanes, an additional receiving lane on Homestead westbound to receive the additional through lane, as well as the addition of a westbound exclusive right-turn lane may be required. This will require widening Homestead Road. An additional eastbound through lane for a total of three through-movement lanes, an additional receiving laneon Homestead eastbound to receive the additionalthrough lane, as well as the addition of an eastbound exclusive left-turn lane for a total of two left-turn lanes may be required. These improvements will require the acquisition of right-of-way and demolition of parking areas. Wolfe Road and I-280 Northbound Ramp (#18):The Apple Campus 2 project will be adding a third northbound through lane starting at the northbound on ramp. This third lane will need to be extended farther southto effectively serve the additional northbound traffic dueto the General Plan development. This could require widening the Wolfe Road overcrossing. Right- of-way acquisition may be required. In accordance with Caltrans procedures, a Project Study Report (PSR) will need to be prepared. The PSR will look at all interchange improvement options, which may include widening the overcrossing and may include redesign of the interchange to go from a partial cloverleaf design to a diamond design. This couldhelp with heavy volumes in the right lane, which contributes to the level-of-service deficiency. Wolfe Road and I-280 Southbound Ramp {#19): An additional through lane for a total of three through-movement lanes for the northbound leg of the intersection at the Wolfe Road and I-280 Southbound Ramp may be required. This additional northbound through lane would require widening to the freeway overcrossing. In addition to widening the overcrossing, the City may wish to pursue a redesign of theinterchange to go from a partial cloverleaf design to a diamond design. This could help with the problem of heavy volume in the right lane, which contributes to the Ievel of service deficiency. Wolfe Road/Miller Avenue and Stevens Creek Boulevard (#21): The restripingof the westbound leg of the intersectionto provide room so that right turn vehicles canbe 1354 General Plan Amendment,Housing Element Update,and associated Rezoning September 9,2014 Page 16 separated from through vehicles may be required. Right turn vehicles would share the bike lane. Right turn vehicles would still be controlled by the signal, and pedestrian crossings would not be affected. Paint a bike box at the front of the lane to provide bikes a place to wait atred Iightsmay enhance the bicycling experience. North Tantau Avenue/Quail Avenue andHomestead Road (#24): Restriping of the southbound leg of the intersection(Quail Avenue) to provide a separate left tum lane may be required. This will require the removal of on-street parking near the intersection. The level- of-service calculationsshow that with implementation of these improvements, the intersection would operate at an acceptableLOS D. Tantau Avenue and Stevens Creek Boulevard (#2: The addition of a separate left-turn lane to northbound Tantau Avenue may be required. Right-of-way acquisition and demolitionof existing commercial buildings would be required. Stevens Creek Boulevard and Agilent Technologies Driveway (#30): The restriping of the westbound leg of the intersection to provide room so that righttum vehicles can be separated from through vehicles may be required. Right turn vehicles would share the bike lane. Right turn vehicles would still be controlled by the signal, and pedestrian crossings would not be affected.Paint a bike box atthe front of the lane to provide bikes a place to wait at red lights may enhancethe bicycling experience. Lawrence Expressway Southbound Rampand Stevens Creek Boulevard (CMI', County) 31): The addition of a second right-turn lane for the southbound leg of the intersection at the Lawrence Expressway Southbound Rampand Stevens Creek Boulevard may be required. Both lanes would need to be controlled by the signal, and disallow right tums on red. Right- of-way acquisition may be required. LawrenceExpressway Northbound Rampand Stevens Creek Boulevard (CMP, County) 32): Redesign of the northbound leg of the intersection at the Lawrence Expressway Northbound Ramp and Stevens Creek Boulevard to provide one through-movement lane, and one exclusive right-turn lane may be required. Right-of-way acquisition would be required. The fees shall be assessed when there is new construction, an increase in square footage in an existing building, or the conversion of existing square footageto a moreintensive use. The fees collected shall be applied toward circulation improvements and right-of-way acquisition. The City shall use the transportation mitigation fees to fund construction (or torecoup fees advancedto fund construction) of the transportationimprovements identified above, among otherthings that at the time of potential future development may be warranted to mitigate transportation impacts. While implementation of Mitigation MeasureTRAF-1 would secure a funding mechanism for future roadway and infrastructure improvements that are necessary to mitigate impacts from future projects based on then current standards, impacts would remain signiftcant and unavoidable, because the City cannot guarantee improvements at these intersections at this time. 1355 GeneralPlan Amendment,Housing Element Update,and associated Rezoning September 9,2014 Page 17 The exact type and timing of requiredtransportation improvements are pending the timing and phasing of future development projects in Cupertino. 8. Utilities and ServiceSystems a. Water Su lv A Water SupplyEvaluation prepared for the proposed Project on May 20, 2014 concluded that there would be adequate water within the water utility service areas of Cal Water and San Jose Water Company for the proposedproject during a single-dry year and multiple-dry years with theproposedand existing water canservation regulations and measures in place. Thus, water supply impactswere found to be less than significant. b. VYastewater Treatment While the current General Plan recognizes existing system deficiencies in both the Cupertino Sanitary District (CSD) and City of Sunnyvale wastewater service areas and includes policies to address this issue, potential future development under the proposed Project would exceed the currentcontractually available treatment capacity at San Jose/Santa Clara Water Pollution Control Plant (SJ/SCWPCP) by 0.85 million gallonsper day. Mitigallon Measures UTIL-6a through UTIL-6bhave been identified to ensure that CSD has adequate capacity to serve the Project's projected demand inaddition to the provider's existingcommitments. Implementation of these mitigation measures requires the City to work with the CSD to increase the available citywide treatment and transmission capacity to 8.65 million gallons per day, or to a lesser threshold if studies justifying reduced wastewatergeneration rates are completed and accepted. With implementation of these mitigation measures, wastewater treatrnent impacts were found to be less than significant. c. Solid Waste Anticipated rates of solid waste disposal would have a less-than-significant impact on the achievement of the City's targetdisposal rates, and the City would continue its current recycling ordinances and zero-waste policies. Nevertheless, the 2023 termination of the agreement between the Newby Island Landfill facility, as well as the facility's estimated closure date in 2025 would result in insufficient solid waste disposal capacity at buildout of the proposed Project. Implernentation of Mitigation Measure UTIL-8, which requires the City to continueits current recycling ordinances and zero-waste policies in an effort to further increase its diversion rate and lower its per capita disposal rate, monitor solid waste generation volumes in relation to capacities at receiving landfill sites to ensure that sufficient capacity existsto accommodate future growth, and seek new landfill sites to replace the Altamont and Newby Island landfills, at such time that these landfills are closed, would result in less-than-significant impactsto solid waste disposal capacity. d. Ener Future new development would be constructed using energy efficientmodern building materials and construction practices, use newmodern appliances and equipment, and would comply with the current CALGreen Building Code, which requires the use of recycled 1356 General Plan Amendment,Housing Element Update,and associated Rezoning September 9,2014 Page 18 construction materials, environmentally sustainable building materials, building designs that reduce the amount of energy used in building heating and cooling systems as compared to conventionally built structures, and landscaping that incorporates water efficient irrigation systems. In addition, there are several General Plan policies and strategies that once adopted would ensure energy conservation is practiced in Cupertino. Buildout of the proposed Project would notsignificantly increase energy demands in the context of the 70,000-square-mile PG&E service territory for electricity and natural gas generation, transmission and distribution. As a result, new energy supply facilities and distribution infrastructure, or capacity-enhancing alterationsto existingfacilities, would not be required and impacts would be less than significant. Pro ect Alternatives In addition to the proposed Project, the Draft EIR evaluated three Project alternatives, including the CEQA-mandated No Project Alternative as previously discussed. The alternatives were intended to feasibly attain most of the basic objectives of the Project while avoiding or lessening any of the significant effects of theProject. Each of the Alternatives was analyzed at the same level of detail, independent of the proposed Project. Recommended mitigation measures in the EIR would apply to all alternatives. Furthermore, compliance with mandatory federal, State and local regulations, including both existing and proposed General Plan policies, designedto reduce environmental impacts would also apply to allfuture development in Cupertino. The Table 3 shows a comparison of impacts from the Project Alternatives in each of the areas of study in the EIR. Within eacharea of study, specific impacts have been studied. Even if one impact has been identified as significant and unavoidable, Table 3 identifies the impact in this entire area of study as significant and unavoidable. TABLE 3 COMPARISON OF IMPACTS FROM PROJECT ALTERNATIVES Proposed Project No Land Use Land Use T P..i._.________....._._..._..........__.... Alternative C) Proj.ect_._.._..Alternative_A___Alternadve B_ Aesthetics LT5 LTS LTS LTS Air Quality SU SU SU SU Biological Resources LTS/M LTS/M LTS/M LTS/M Cultural Resources LTS LTS LT5 LTS Geology,Soils,And Mineral Resources LTS I.TS LTS LTS Greenhouse Gas Emissions LTS LTS L'I5 LTS Hazards And Hazardous Materials LT5/M LT5/M LTS/M LTS/M Hydrology And Water Quality LT5 LT5 LTS LTS Land Use And Planning LTS LTS LTS LTS Noise SU SU SU SU Population And Housing LTS LTS LT5 LTS Public Services And Recreation LTS LTS LT5 LTS Transportation And Traffic SU SU SU SU Utilities And Infrastructure LTS/M LTS/M LTS/M LTS/M SNoteSU=Significant and Unavoidable,LTS=Less Than Sigiuficant,LTS/M Less Than Si 'ficant with mih at on 1357 General Plan Amendment,Housing Element Update,and associated Rezoning September 9,2014 Page 19 A comparison table of the specific impacts within each area of study is provided in Attachment 2(Draft EIR Volume II Chapter 5.0 Page 5.7—5.15.) Table 5.3 in the Draft EIR indicates thatfuture development under Land Use Alternative B would result in a less-than-significant conclusion under Impact AQ-1 (Air Quality), whereas under the other three alternatives were found to be significant and unavoidable. This is because development anticipated under Land Use Alternative B would be consistent with the Bay Area Air Quality Management District's (BAAQMD) 2010 Bay Area Clean Air Plan based on the outcome of thevehicles milestraveled (VM'I analysis 3 The VMT estimates in the VTA model are sensitive to changes in land use. Generally, land uses that reflect a more balanced jobs- housing ratio in the VTA model result in lower per capita VMT. The BAAQMD's 2010 Bay Area Clean Air Plan requires that the VMT increase be less than or equaltothe projected population increase and of the proposed Project. The analysis indicates that dailyVMT in the Project Study Area would increase at a slower rate 22.3 percent) between 2013 and 2040 than would the service population of the Project Study Area (25.0 percent). Whereas in the ProposedProject, the No Project Alternative, and in Alternative B, daily VMTwould increase at a slightly greaterrate between 2013 and 2040 than would the service populaHon of the Project Study Area. The potential impacts of future development under the No Project Alternative would be substantially less than the proposed Project (Alternative C) followed by Alternative A and then Alternative B. This is because AltemativesA and B would reduce development allocations, population and jobs when compared to the ProposedProject, which would reduce consumption of non-renewable resources, production of wasteand pollutants, and decreasing the demand for public facilities and infrastructure compared to the ProposedProject in proportion to the reduction in development proposed forAlternative A and Alternative B. However, the Draft EIR indicates that Significant and Unavoidable Impacts would occur even under the No Project Alternative with the growth assumptions in the runent 2000-2020 General Plan. The EIR identifies Land Use Alternative A as the environmentally superioraltemative,+because less development would occur compared to both the proposed Project and Land Use Alternative B. Under Land Use Alternative A, no new office, commercial space or residential units would be permitted beyond what is approved in the current GeneralPlan. Therefore, Altemative A is considered the environmentally superioralternative. Subsequently, less development would result in the reduction of the consumption of renewable and nonrenewable resources, and would place fewer demandson public service providers which could require new facilities, requirefewer road, sewer, water, and energy infrastructure improvements, and generate less waste. 3 The vehicles miles traveled(VMT)refers to Cupertino trips multiplied by the trip distances.See Section 4.13.4.9 in Chapter 4.13,Transportation and Traffic,of this Draft EIR. CEQA requires that an altemative otherthan the No Project Alternative be identified as the environmentally superior alternative. CEQAGuidelines Section 15126.6(e)(2). 1358 General Plan Amendment,Housing Element Update,and associated Rezoning September 9,2014 Page 20 Res onse to Comments andTextRevisions Six comment letters were received from public agencies and 19 comment letters were received from members of thegeneral public during the 45-day review period of the Draft EIR. A majority of thecomments were either in support of or opposition to the Project or concemed the merits of the Project itself, and did not address a significantenvironmental issue implicating the adequacy of the EIR. Comments received included commentson traffic, aestheHcs and the impacts on utilities and public services (sanitary/sewer facilities and schools.) All comments received during the public review period and that raised a significant environmental issue have been addressed in the RTC document. Text revisions to clarify text in the Draft EIR andupdates in response tocomments have also been made. The revisions do not affect any conclusions or significance determinations provided in the Draft EIR. The RTC document and the Draft EIR together are considered to be the Final EIR for the proposed Project.Because no neworsubstantially more severe significant impacts, and no new mitigation measures or alternatives that would clearly lessen the significant impacts of the Project were identified after circulationof the Draft EIIZ, recirculation of the EIR is not required. Comments were also received after the close of the EIR public review period. While CEQA dces not require that the City respondto the commentsreceived after the close of the public review period, staff will continue to provide responses to these comments. As of August 31, 2014, two comment letters were received. The comment lettersreceived after the close of the comment period did not concern newor substantially more severe significant impacts, mitigation measures, or projectalternatives, or change the findingsof the Draft EIR(see Attachment 3.) Next Ste s Staff will present the Final EIR to the Environmental Review Committee (ERC) for review and recommendation on October 2, 2014. The Final EIR and General Plan Amendment, Housing Element Update, and associated RezoningProject will be presented to the Planning Commission for review and recommendation on October 14,2014. The City Council's review on the certification of the EIR, GeneralPlan Amendment, Draft 2014-2022 Housing Element, and associated rezoning is expected to be on November 3, 2014. Pre ar_e_Piu Ghosh,Senior Planner Reviewed bv: Gary Chao,Assistant Directorof Community Development Avvroved for Submission bv: Aarti Shrivastava,Assistant City Manager Attachments: 1 -General Plan Amendment,Housing Element Update, and associated Rezoning Response to Comments Document,August 29, 2014 2-General Plan Amendment,Housing Element Update, and associated Rezoning Draft Environmental Impact Report,june 18, 2014 3—Late Comments Memo from P1aceWorks dated Sept. 4,2014 1359 PAPER COPIESOF ATTACHMENTS 1 &2 WERE DELIVERED ON JUNE 18,2014 AND AUGUST 29,2014 RESPECTIVELY. THESE ARE ALSO AVAILABLEONLINEAT: www.cu ertinogpa_org and www.cu ertino.or/records. ATTACHMENT 1: Response To Comments (RTC)Document: Click here. Appendix A To RTC Document Click here. ATTACHMENT 2: Draft EIR Volume I: Click here. Draft EIR Volume II:Click here. Draft EIR Appendices: Click here. 1360 CITYCOUNCIL STAFF REPORT Meeting: October 7, 2014 Application: GPA-2013-01, GPA-2013-02, SPA-2014-01, Z-2013-01 and MCA-2014-01 (EA-2013- 03); Applicant: City of Cupertino; Property Location: City-wide Subject Study Session on the Final EnvironmentalImpact Report (EIR) for the proposed General Plan Amendment, Housing Element Update, and associated Rezoning. Recommended Action Staff recommends that the City Council receive this report and comments on the Final EIR. The Final EIR consists of the Draft EIR published in June 2014 (Attachment A), the Response to Comments (RTC) Document, published in August 2014 (Attachment B), and the Erratamemo No. 1 (Attachment C). This is a study session and no action is required at this time. Background On August 21, 2012, the City Council directedstaff to evaluate replenishing citywide office, commercial, andhotel development allocation. During the same time frame, several property owners, including some owners within the Vallco Shopping District, approachedthe City about potential General Plan amendments to allow future development of their properties. In order to comprehensively evaluate citywide needs and individual sites, in early 2013, the City Council directedstaff to combine these individual requests into one comprehensive General Plan Amendment. In addition, in November 2013, the City initiated a process to update the State-mandated Housing Element of the General Plan. The Housing Element, which is a required component of the General Plan, identifies appropriate locations and policies for future housing in Cupertino. The City Council decided to combinethe Housing Element Update process with the General Plan Amendment process so the City and community could fully evaluate and discuss mobility, urban design, economic development, andhousingoptions in one comprehensiveoutreach and planning process. OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300TORRE AVENUE • CUPERTINO, CA 95014-3255 408) 777-3308 • FAX (408) 777-3333 91361 General Plan Amendment, Housing Element Update, and Associated Rezoning October 7, 2014 Page 2 The General Plan Amendment process has involved extensive community discussions and input provided during several public meetings, workshops, study sessions, and through online comment formsand surveys. The proposed Project considers citywide land use, urban design, mobility, and economic development choices but is not a complete revision of the City’s 2000- 2020 General Plan. EnvironmentalImpact Report The California Environmental QualityAct (CEQA) requires that all State and local governments considerthe physical changes that result as aconsequence of projects over which they have discretionary authority. A Final EIR for the Project hasbeen prepared in accordance with the requirements of the California Environmental Quality Act (CEQA). The purpose of the EIRis not to recommend approval or denial of a project but toprovide information to be used in the planning and decision making process. CEQA requires decisionmakers to balance the benefits of a proposed project against the environmental effects, along with other factors. The Planning Commission had a study session on September 9, 2014. The attached staff report Attachment D) provides additional details on the EIR and the land use alternatives studied. The proposed land use alternatives and changes to the General Plan goals, policiesand strategies would require amendments to the City of Cupertino 2000-2020 GeneralPlan adopted by the City Council on November 15, 2005. Discussion Planning Commission Study Session At the Planning Commission Study Session, commissioners and members of the public asked questions and requested clarification as follows: Planning Commission Number of alternatives studied in the EIR and which alternative wasthe Environmentally Superior Alternative: It was clarified that the EIR provided an analysis of four alternatives; 1) Alternative A, Alternative B, Alternative C, which wasthe proposed Project under CEQA, and the CEQA-required No Project Alternative. The EIR identified the No Project Alternative as the Environmentally Superior Alternative; however, as required by CEQA when the No Project Alternative is the Environmentally Superior Alternative, another alternative must be selected. Accordingly, Alternative A, which would consume the fewest resources and result in the least amount of development when compared to Alternatives B and C, was chosen as the Environmentally Superior Alternative. Alternative C vs. “Preferred Project”: Clarification was requested on the difference between Alternative C and “Preferred Project.” It was clarified that Alternative C was not to be the preferred project” of the City, but rather it was the alternative that was selected to be studied in the EIR as the proposed Project because it represented the mostintensive development. It was clarified that the term “preferred project” is a term-of-art when preparingprogram-level EIR’s and only means it is the project studied in the EIR; it does not mean it has been pre-determined to be the approved plan. WhentheCommissionand 101362 General Plan Amendment, Housing Element Update, and Associated Rezoning October 7, 2014 Page 3 the Council consider which alternative to select, the EIR only represents one factor to consider. Other potential factors that may determine which alternative to select include economic impacts, social and community benefits, jobs and housing etc. RHNA vs. recommended housing units: Clarification was requested on the number of housing units required by the RHNA (i.e. 1,064 units) versus the number of housing units recommended for inclusion in the Draft Housing Element. It was clarified that the Department of Housing and Community Development (HCD) typically recommends 40 percent over the required RHNAfor the current planning period. Since there have been entitlements for 62 units in this planning period, the City’s remaining RHNA is 1002. Therefore, it is being recommended that the City select sites with a total capacity of approximately 1,400 units. Mitigation: Staff clarified the term “mitigation” meaning that the impact would be reduced to the acceptable threshold for thatparticular impact. Where the impact is not brought below the acceptable threshold, the term “significant and unavoidable” is used to show the impact will remain even when mitigation is applied. Plan Bay Area: Clarification requested on whether Plan Bay Area is a controlling document. The Plan Bay Area is the long-range integrated transportation and land-use/housing strategy through 2040 for the San FranciscoBay Area pursuant to Senate Bill 375, the Sustainable Communitiesand Climate Protection Act. Staff clarified that the RHNA is the only regulatory portion of thePlan Bay Area. Number of Housing Units by Alternative: Clarification onthe number of housing units considered in each of the alternatives was requested. Staff clarified that both the No Project Alternative and Alternative A represent no change to the existinghousing units developmentallocation in the current 2020 General Plan. Alternatives B and C respond to thePlan Bay Area. The selection of housing sites in each alternative represent gradations of what is ultimately required by 2040, which spans a time-period comprised of three Housing Element cycles. Alternative B represents 75 percent (or a totalof 3,601 units) and Alternative C represents 100 percent (or a total of 4,421 units) of the Housing Element sites required through 2040, Traffic Analysis: Clarification on the traffic study prepared for the EIR, what would happen if there are errors in the traffic study, whether the TIA considered the longer commute patterns from regionally generated traffic volumes and whether the VTA model extends to 2040. Staff clarified that the traffic study has been prepared to forecast traffic impacts accurately using the Santa Clara Valley Transportation Authority (VTA) guidelines for how to prepare traffic studies. Staff clarified that the traffic model applied is the VTA standard model that includes regional traffic in the communities that contribute to traffic in Cupertino and extends to 2040. The VTA approvedmethodology is the standard for all projects in Cupertino and the surrounding communities, which ensures consistency in assessing traffic impacts in the region. 111363 General Plan Amendment, Housing Element Update, and Associated Rezoning October 7, 2014 Page 4 Bus Rapid Transit (BRT): A questions regarding the status of the BRT project was posed. Staff clarified the BRT project is not considered in the EIR and when proposed by the VTA, any changes to the City’s right-of-way would need the City’s approval. At this time, no proposal has been brought to the City to consider. However, a separate memo hasbeen prepared reviewing the impacts of a dedicated bus lane for BRT (see Attachment E). Sewer Capacity: Information was requested on the sewer capacity. It was clarified that sewer capacity is not a physical impact, but the contractual limit on what has been purchased from the San Jose/Santa Clara Treatment Plant. The contractual limit could be reached many years into the buildout of the proposed Project and in the meantime it is quite possible that ongoing measures, including water conservation and green building practices would continue reducing the sewer generation rates studied in the EIR. Air Quality: Clarification was requested on whether the long-termhorizon analyzed in the traffic impact analysis (TIA) considered the Environmental Protection Agency (EPA) trends and mandates with regard tofuel economy is factored into the TIA. Staff clarified the EPA standards are factored into the air quality modeland not the traffic model. Assumptions regarding cleaner fuel-burning cars and more cars are considered in the long-term air quality emissions projections. HCD Review Timelines: Clarification on thedeadlines and timelines for the Project regarding HCD review was requested. The deadline for the Housing Element is January 31, 2015 and there is a 120-day grace period; therefore, the City must have an adopted Housing Element byMay 31, 2015. HCD is allowed a 60-day reviewperiod to review the Housing Element. Forthe City to have adequate time, the draft Housing Element must be sent to HCD by November. Adequate Sites for the Housing Element: Clarification was requested on what would happen if HCD determines that the sitesselected do not meet HCD criteria. It was explained that the list of potential housing element sites has been selected usingboth HCD and City criteria. The importance of submitting the draft Housing Element to HCD early was stressed, since the dialogue regarding adequate housing sites will commence between the City and HCD during the 60-day reviewperiod. More sites than necessary to accommodate the RHNA have been identified, which will help facilitate the dialogue with HCD. Schools: Clarification on why the EIR concludes that overcrowding in schools can be alleviated through the construction of additional floors (building up), and how impact fees can be used by the school. It was also notedthe schools are currently at capacity and the student generation is based on high-density housing. Staff clarified that the school districts are going to prepare a facilities plan for ongoing long-range planning. Schools constantly work on plans to alleviate overcrowding such as moving studentsbetween schools and consolidating programs as short term solutions and to avoid redistricting. The school impact fees, which areset by the schools and the state, can be applied to new facilities, but not to operations. Staff clarified that the data used to preparethe school impact analysis is from the school’s demographer and the housing sites and unit types are in synch with the district’s projections. However, the City cannot dictate how the impact fees are used or 121364 General Plan Amendment, Housing Element Update, and Associated Rezoning October 7, 2014 Page 5 make land use decisions based onimpacts to schools since the impact fee is intended to mitigate school impacts (See Attachment F). Public Comment: The role of public comment in thedecision making process for the project was discussed. Staff clarified that the study session was about the EIR. All comments on the environmental impacts have been addressed in the Response to Comments document and late comments memo dated 3 September, 2014 (Attachment G) and late comments memo update dated 30 September, 2014 (Attachment H). Comments on the merits of proposed Project will be addressed separately prior to public hearings on the project. Baseline: Clarification on the baseline for the buildout numbers described in the proposed Project with respect to development that is currently underway was sought. It was clarified that thedevelopment that is currently underway is partofwhat has already been analyzed in the 2020 General Plan and the buildout projections of the proposed Project are set at the time the Notice of Preparation for the proposed Project was issued (i.e. March 5, 2014). Staff maintains a current list of developmentallocation which tracks what is approvedand what has been developed. Impact Analysis: It was noted that all of the environmentalimpact conclusions are the same, but theimpacts vary by degrees based on the level of development analyzed in each alternative. Staff confirmed this is correct. Errors and Omissions: A missing footnote was identified. This has been included in the SupplementalText Revisions of the Final EIR memo (see Attachment C). Buildout Projections: Clarification on the differing build out numbers in Chapter 4.14, Utilities and ServiceSystems of the Draft EIR was sought. Staff clarifiedthat persons per household rate used in ABAG projections varies in 5 year increments, which is different than the single 2040 rate used in the EIR. Members of the Public Traffic – Concerns were expressed by a speaker about existing traffic and increased traffic anticipated as part of the Alternativesstudied in the EIR. The speakerexpressed a preference for the No Project alternative or Alternative A. Heart of the City – One speaker requested that the Heart of the City be maintained and respected. Another speakerexpressedconcerns about development on the eastern partof the city and recommended that there should bea citywidedistribution to reduce impacts. Staff clarified that sites brought forward by applicantsand during the community process were all reviewed; however, the sites on the western side of the city alone either did not meet the criteria or would not be able to accommodate the Regional Housing Needs Allocation (RHNA) required by the State. Schools - There was also a comment made that school sites should be identified. Staff clarified that developments will be required to pay a school impact fee set by each school district. However, sites would have to be acquired by school districts through their facility planning process. 131365 General Plan Amendment, Housing Element Update, and Associated Rezoning October 7, 2014 Page 6 North Vallco - A representative from Apple Inc., requested that future development adjacent to Apple Campus be considerate of their needs related to security, privacy, and traffic. He clarified that they are working closely with the Irvine Companyregarding the adjacent Hamptons site. A representative from the Irvine Company stated they are cooperating with Apple on the redevelopment of the Hamptons site and would not be opposed to reduced heights directly adjacent to the Apple campus. She clarified students generated from any potential project on their site would be in the Santa Clara Unified School District and they are working with the District on possible mitigations. Regional Plans – concerns were expressed aboutthe Plan Bay Area, the regional Bay Area documentprepared by the Association of Bay Area Governments (ABAG) and the Metropolitan Transportation Commission (MTC). A resident felt that it was not a good fit for Cupertino and that the document lookedtoo far into the future. In addition, a resident noted that she did not support the Bus Rapid Transit dedicated lanes because they would cause more delays in traffic. Staff would like to note that the General Plan and Housing Element updates do not include dedicated Bus Rapid Transit lanes since the project has not been approved. The Valley Transportation Authority (VTA) is working on this as a potential future project but has not presented any plans to the City. The project is not being reviewed at thistime by the City and would require the participation and consent of the City. Response to Comments and Text Revisions Comments were also received after the close of the EIR public review period on August 1, 2014. While CEQA does not require that the City respond to the comments received after the close of the public review period, staff will continue toprovide responses to these comments. As of September 30, 2014, eleven commentletters were received. The comment letters received after the close of the comment period did not concern new or substantially more severe significant impacts, mitigation measures, or projectalternatives, or change the findingsof the Draft EIR see Attachments G & H.) Supplemental Text Revisions Following the publication of the RTC document on August 28, 2014, supplemental text revisions to clarify text in the Draft EIR have been made. These supplemental revisions are provided in the General Plan Amendment, Housing Element Update, and associated Rezoning Project Final EnvironmentalImpact Report Errata No. 1. (See Attachment C) These revisions do not result in new significantenvironmental impacts, do not constitute new information, and do not alter the conclusions of the environmental analysis. The Draft EIR, the RTC documentand Errata No. 1 together are considered to be the Final EIR for the proposed Project. Because no new or substantially more severe significant impacts, and no new mitigation measures or alternatives that would clearly lessen the significant impacts of the Project were identified after circulation of the Draft EIR, recirculation of the EIR is not required. 141366 General Plan Amendment, Housing Element Update, and Associated Rezoning October 7, 2014 Page 7 Next Steps The Environmental ReviewCommittee (ERC) will review and make a recommendation for the EIR for the projecton October 2, 2014. The ERC recommendation will be provided to the City Council at the October 7, 2014 EIR Study Session, and to the Planning Commission prior to the public hearing on October 14, 2014. The Final EIR and General Plan Amendment, Housing Element Update, and associated Rezoning Project including zoning text amendments and Specific Plan Amendments will be presented to the Planning Commission for review and recommendation on October 14, 2014. The City Council’s review on the certification of the EIR, GeneralPlan Amendment, 2014-2022 Housing Element, and associated rezoningis expected to be on November 3, 2014, and the second reading related to the rezoning is expected to be on November 18, 2014. Prepared by: Piu Ghosh, Senior Planner Reviewed by: Gary Chao, Assistant Director of Community Development Approved for Submission by: Aarti Shrivastava, Assistant City Manager Attachments: A – General Plan Amendment, Housing Element Update, and associated Rezoning Draft EnvironmentalImpact Report, June18, 2014 B – General Plan Amendment, Housing Element Update, and associated Rezoning Response to Comments Document, August 29, 2014 C – Errata No. 1: SupplementalText Revisions, October 1, 2014 D – Planning Commission Staff Report, September 9, 2014 E – Transportation Effects of BRT, March 29, 2014 F – Application of SB 50 to Consideration of Development Applications G – Late Comments Memo from PlaceWorks, September 3, 2014 H – LateComments Memo Updated from PlaceWorks, September 30, 2014 151367 Attachment Z – Draft Environmental Impact Report Dated June 18, 2014 Please view this information on the City’s website at: http://www.cupertinogpa.org/ Attachment #19 (under the October 14, 2014 Planning Commission Public Hearing meeting) 1368 Attachment AA – Responses to Comments Document Dated August 28, 2014 Please view this information on the City’s website at: http://www.cupertinogpa.org/ Attachment #24 (under the October 14, 2014 Planning Commission Public Hearing meeting) 1369     MEMORANDUM DATE November 3, 2014  TO Piu Ghosh  FROM Steve Noack and Terri McCracken  SUBJECT Supplemental Text Revisions to the General Plan Amendment, Housing Element Update  and Assoicated Rezoning Project Final Environmental Impact Report (EIR)  This memorandum describes changes made to the text of the General Plan Amendment, Housing  Element Update and Associated Rezoning Project Final EIR.  The Final EIR is comprised of the June 18,  2014 Draft EIR and the August 28, 2014 Response to Comments document.   As shown in Table 1, Supplemental Text Revisions to the Final EIR, the revisions include typographical  corrections, insignificant modifications, amplifications and clarifications of the EIR.  These changes do  not result in new significant environmental impacts, do not constitute new information, and do not  alter the conclusions of the environmental analysis in the Final EIR as defined in CEQA Guidelines  Section 15088.5.  Underlined text represents language that has been added to the EIR; text with strikethrough has been  deleted from the EIR.    1370   No v e m b e r  3, 2014 | Page 2  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e Ch a p t e r  1:  In t r o d u c t i o n  of  th e  Dr a f t  EI R   1‐1  Pr o p o s e d  Pr o j e c t   Th e  Ci t y  of  Cu p e r t i n o  is  cu r r e n t l y  un d e r t a k i n g  a co m m u n i t y ‐ba s e d  pl a n n i n g  pr o c e s s  to  re v i e w  la n d  us e  al t e r n a t i v e s  as part of a focused  Ge n e r a l  Pl a n  Am e n d m e n t .  Pr o p o s e d  al t e r n a t i v e s  in c l u d e  op t i o n s  fo r  ci t y ‐wi d e  de v e l o p m e n t  al l o c a t i o n s  (o f f i c e ,  commercial, hotel, and  re s i d e n t i a l ) ,  as  we l l  as  bu i l d i n g  he i g h t s  an d  de n s i t i e s  fo r  fi v e  Sp e c i a l  Ar e a s  al o n g  ma jo r  tr a n s p o r t a t i o n  co r r i d o r s ,  where Gateways and  No d e s  ha v e  be e n  id e n t i f i e d ,  se v e n  St u d y  Ar e a s ,  an d  Ot h e r  Sp e c i a l  Ar e a s  in c l u d i n g  Ne i g h b o r h o o d s  an d  No n ‐re s i d e n t i a l / M i x e d  Use Special  Ar e a s .  Th e s e  Pr o j e c t  Co m p o n e n t  lo c a t i o n s  ar e  sh o w n  in  Ch a p t e r  3,  Pr o j e c t  De s c r i p t i o n ,  of  th i s  Dr a f t  EI R  on  Fi g u r e s  3‐43‐5, 3‐103‐11, and  3‐19 ,  re s p e c t i v e l y .   Ch a p t e r  3:  Pr o j e c t  De s c r i p t i o n  of  th e  Dr a f t  EI R   3‐13   Fo o t n o t e  “c ” o f   Ta b l e  3‐2 Su m m a r y   – Al l  Pr o j e c t   Co m p o n e n t s   De v e l o p m e n t   Al l o c a t i o n s   c.  Ne t  ne w  co m m e r c i a l  is  no t  pr o p o s e d .  Th i s  nu m b e r  as s u m e s  th a t  th e  ex i s t i n g  Va l l c o  Sh o p p i n g  Ma l l  sq u a r e  fo o t a g e  (1,267,601 sf) will be  de m o l i s h e d  an d  64 2 , 2 6 6  sf  wi l l  go  ba c k  in t o  th e  Ci t y ‐wi d e  co m m e r c i a l  al l o c a t i o n  po o l .  A Th e  re m a i n i n g  to t a l  of  625,335 sf would be  re s e r v e d  fo r  a fu t u r e  pr o j e c t  in  th e  Va l l c o  di s t r i c t .  Du e  to  th e  hi g h  va c a n c y  ra t e  at  th e  Va l l c o  Sh o p p i n g  Ma l l  un d e r  existing conditions, this  EI R  pr o v i d e s  a co n s e r v a t i v e  an a l y s i s  fo r  th e  to t a l  co m m e r c i a l  de v e l o p m e n t  al l o c a t i o n  of  1, 3 4 3 , 6 7 9  sq u a r e  fe e t  (i . e .  642,266 square feet +  70 1 , 4 1 3  sq u a r e  fe e t )  du r i n g  th e  pl a n n i n g  pe r i o d  fo r  th e  pr o p o s e d  Pr o j e c t .   3‐33   So u t h  De  An z a   Sp e c i a l  Ar e a   Un d e r  th e  pr o p o s e d  Pr o j e c t ,  th e  So u t h  De  An z a  Sp e c i a l  Ar e a  wo u l d  re m a i n  a mi x e d ‐us e  ar e a  wi t h  in d u s t r i a l  of f i c e  uses south of Stevens  Cr e e k  Bo u l e v a r d .  A sm a l l  re a l i g n m e n t  of  th e  bo u n d a r y  wo u l d  be  ma d e  to  al i g n  an  ex i s t i n g  of f i c e  de v e l o p m e n t  on  Pacifica Avenue into the  Sp e c i a l  Ar e a.  Th e  la n d  us e  de s i g n a t i o n  of  th i s  de v e l o p m e n t  cu r r e nt l y  al l o w s  th e  sa m e  la n d  us e s  al l o w e d  by  th e  South De Anza Conceptual  Pl a n  th a t  go v e r n s  th e  no r t h e r n  po r t i o n  of  th i s  Sp e c i a l  Ar e a .  In  ad d i t i o n ,  th e  bo u n d a r i e s  in  th e  Ge n e r a l  Pl a n  an d  eventually in the South De  An z a  Co n c e p t u a l  Pl a n  wi l l  be  up d a t e d  to  in c o r p o r a t e  3 pa r c e l s  (A s s e s s o r  Pa r c e l  Nu m b e r s  [A P N ]  35 9 ‐18 ‐05 0 ,  15 9 ‐18‐051 and 159‐18‐049)  in t o  th i s  Sp e c i a l  Ar e a . 1 As  sh o w n  in  Ta b l e  3‐8,  un d e r  th e  pr o p o s e d  Pr o j e c t  th i s  Sp e c i a l  Ar e a  wo u l d  re s u l t  in  in c r e a s e d  office, commercial,  an d  ho t e l  al l o c a t i o n s ,  an d  in c r e a s e d  re s i d e n t i a l  un i t s ,  wi t h  an  in c r e a s e  in  th e  de n s i t y  fr o m  5 to  15  du / a c  to  25  du / a c  in the southern  po r t i o n  of  th i s  Sp e c i a l  Ar e a .  Th i s  Sp e c i a l  Ar e a  al s o  in c l u d e s  Ho u s i n g  El e m e n t  Si t e  16  (S u m m e r w i n d s  an d  Gr a n i t e  Rock) at a higher density of  40  du / a c  bu t  no  ch a n g e  in  an d  th e  pe r m i t t e d  bu i l d i n g  he i g h t s  wo u l d  be  in c r e a s e d  by  15  fe e t .  Ho u s i n g  El e m e n t  Site 16 (Summerwinds and                                                                                                                           1 AP N  35 9 ‐18 ‐05 0 ,  15 9 ‐18 ‐05 1  an d  15 9 ‐18 ‐04 9  we r e  in c l u d e d  in  Fi g u r e  3‐10  in  th e  Dr a f t  EI R .   13 7 1   No v e m b e r  3, 2014 | Page 3  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e Gr a n i t e  Ro c k )  is  di s c u s s e d  in  mo r e  de t a i l  be l o w  in  Se c t i o n  3. 7 . 4 . 1 6 . 3‐34   So u t h  De  An z a   Sp e c i a l  Ar e a   Un d e r  th e  pr o p o s e d  Pr o j e c t ,  th e  So u t h  De  An z a  Sp e c i a l  Ar e a  wo u l d  re m a i n  a mi x e d ‐us e  ar e a  wi t h  in d u s t r i a l  of f i c e  uses south of Stevens  Cr e e k  Bo u l e v a r d .  A sm a l l  re a l i g n m e n t  of  th e  bo u n d a r y  wo u l d  be  ma d e  to  al i g n  an  ex i s t i n g  of f i c e  de v e l o p m e n t  on  Pacifica Avenue into the  Sp e c i a l  Ar e a .  Th e  la n d  us e  de s i g n a t i o n  of  th i s  de v e l o p m e n t  cu r r e nt l y  al l o w s  th e  sa m e  la n d  us e s  al l o w e d  by  th e  South De Anza Conceptual  Pl a n  th a t  go v e r n s  th e  no r t h e r n  po r t i o n  of  th i s  Sp e c i a l  Ar e a .  As  sh o w n  in  Ta b l e  3‐8,  un d e r  th e  pr o p o s e d  Pr o j e c t  th i s  Special Area would  re s u l t  in  in c r e a s e d  of f i c e ,  co m m e r c i a l ,  an d  ho t e l  al l o c a t i o n s ,  an d  in c r e a s e d  re s i d e n t i a l  un i t s ,  wi t h  an  in c r e a s e  in  the density from 5 to 15  du / a c  to  25  du / a c  in  th e  so u t h e r n  po r t i o n  of  th i s  Sp e c i a l  Ar e a .  Th i s  Sp e c i a l  Ar e a  al s o  in c l u d e s  Ho u s i n g  El e m e n t  Site 16 (Summerwinds and  Gr a n i t e  Ro c k )  at  a hi g h e r  de n s i t y  of  40  du / a c  bu t  no  ch a n g e  in  th e  pe r m i t t e d  bu i l d i n g  he i g h t s  an d  a 15  fo o t  bu i l d i n g  height increase.  Ho u s i n g  El e m e n t  Si t e  16  (S u m m e r w i n d s  an d  Gr a n i t e  Ro c k )  is  di s c u s s e d  in  mo r e  de t a i l  be l o w  in  Se c t i o n  3. 7 . 4 . 1 6 .      3‐34   Fi g u r e  3‐10   Fi g u r e  3‐10 ,  Pr o p o s e d  So u t h  De  An z a  Sp e c i a l  Ar e a ,  in c l u d e d  AP N  35 9 ‐18 ‐02 8 .    As  sh o w n  on  th e  fo l l o w i n g  re v i s e d  figure, this parcel has  be e n  re m o v e d .  Th e  re v i s e d  fi g u r e  ha s  be e n  in c l u d e d  at  th e  en d  of  th i s  ta b l e .   3‐53   St u d y  Ar e a  6 (V a l l c o   Sh o p p i n g  Di s t r i c t )   Un d e r  th e  pr o p o s e d  Pr o j e c t ,  St u d y  Ar e a  6 (V a l l c o  Sh o p p i n g  Di s t r i c t )  wo u l d  in c l u d e  a ma j o r  re d e s i g n  of  th e  Va l l c o  Shopping Mall area to  cr e a t e  a “d o w n t o w n ”  fo r  Cu p e r t i n o .  Pr o p o s e d  us e s  wo u l d  in c l u d e  co m m e r c i a l ,  of f i c e ,  re s i d e n t i a l ,  pu b l i c / q u a s i ‐public, light industrial and  ho t e l .  A ma j o r i t y  of  th i s  St u d y  Ar e a  is  al s o  a po t e n t i a l  Ho u s i n g  El e m e n t  Si t e  11  (V a l l c o  Sh o p p i n g  Di s t r i c t  ex c e p t  Rosebowl). In South Vallco  Pa r k  Ga t e w a y  We s t ,  ma x i m u m  he i g h t s  wo u l d  be  60  fe e t  or  up  to  85  fe e t ,  if  a pr o j e c t  fe a t u r e s  a re t a i l  co m p o n e n t  and provides community  be n e f i t s .  Se e  Ta b l e  3‐15  fo r  a de s c r i p t i o n  of  he i g h t  al l o w a n c e d  by  pa r c e l .    In  So u t h  Va l l c o  Pa r k  Ga t e w a y  Ea s t ,  ma x i m u m  he i g h t  wo u l d  be  75  fe e t  or  up  to  16 0  fe e t  if  a pr o j e c t  in c l u d e s  a re t a i l  component and  pr o v i d e s  co m m u n i t y  be n e f i t s .  Se e  Ta b l e  3‐15  fo r  a de s c r i p t i o n  of  he i g h t  al l o w a n c e d  by  pa r c e l .  As  sh o w n  be l o w  in  Table 3‐15, zoning would  be  am e n d e d  to  Pl a n n e d  De v e l o p m e n t ,  Re g i o n a l  Sh o p p i n g ,  Pr o f e s s i o n a l  Of f i c e ,  Li g h t  In d u s t r i a l  Pa r k  an d  Re s i d e n t i a l  (P(Regional Shopping,  OM P ,  Re s ) )  to  al l o w  fo r  re s e a r c h  an d  de v e l o p m e n t  of f i c e s  an d  re s i d e n t i a l  us e s .  Fu r t h e r ,  th e  Ge n e r a l  Pl a n  de s i g n a t i o n s  would be changed  to  Co m m e r c i a l R e g i o n a l  Sh o p p i n g / O f f i c e / R e s i d e n t i a l  (C R e g i o n a l  Sh o p p i n g / O / R )  to  al l o w  fo r  of f i c e  us e s  in  ad d i t i o n  to commercial regional  sh o p p i n g  an d  re s i d e n t i a l  us e s ,  wh i c h  ar e  th e  ex i s t i n g  de s i g n a t i o n s .  Th e  Ge n e r a l  Pl a n  la n d  us e  de s i g n a t i o n s  at  th e  Rosebowl site would not  be  ch a n g e d .  It  is  al s o  no t  an t i c i p a t e d  th a t  th e  Ro s e b o w l  si t e  wi l l  be  re d e v e l o p e d  or  de m o l i s h e d .     3‐54  an d  3‐ 55   St u d y  Ar e a  6 (V a l l c o   Sh o p p i n g  Di s t r i c t )   TAB L E  3‐15   STU D Y  ARE A  6 (V AL L C O  SHO P P I N G  DIS T R I C T ) EXI S T I N G  AN D  PRO P O S E D  DEV E L O P M E N T  STA N D A R D S   Ma p  #  Te n a n t  /  Ad d r e s s   AP N   Pa r c e l   Bu i l d i n g Ge n e r a l  Pl a n   Zo n i n g   Ma x i m u m  Density Maximum Height 13 7 2   No v e m b e r  3, 2014 | Page 4  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e Us e Si z e S i z e Ex i s t i n g Pr o p o s e d   Ex i s t i n g   Pr o p o s e d   Ex i s t i n g   ProposedExisting Propose d  1  AM C   Th e a t e r   10 1 2 3   No r t h   Wo l f e   Ro a d   31 6 ‐20 ‐ 10 3   1. 8 5   ac   93 , 3 3 2   sf   C/ R   C/ R e g i o n a l   Sh o p p i n g / O /R   P( R e g i o n a l   Sh o p p i n g )   P( R e g i o n a l   Sh o p p i n g ,   OP M P ,   Re s )   35   du / a c   35 du/ac 60 feet 60 feet 75 feeta 85 feetb  2  Be n i h a n a ’ s   / Bo w l m o r   20 7 4   Va l l c o   Fa s h i o n   Pa r k   31 6 ‐20 ‐ 10 0   3. 9 8   ac   44 2 , 8 1 3   sf   C/ R   C/ R e g i o n a l   Sh o p p i n g / O /R   P( R e g i o n a l   Sh o p p i n g )   P( R e g i o n a l   Sh o p p i n g ,   OP M P ,   Re s )   35   du / a c   35 du/ac 60 feet 75 feet 90 feeta 160 feetc  3  Dy n a s t y   Re s t a u r a n t   10 1 2 3   No r t h   Wo l f e   Ro a d   31 6 ‐20 ‐ 10 5   C/ R   C/ R e g i o n a l   Sh o p p i n g / O /R   P( R e g i o n a l   Sh o p p i n g )   P( R e g i o n a l   Sh o p p i n g ,   OP M P ,   Re s )   35   du / a c   35 du/ac 60 feet 60 feet 75 feeta 85 feetb  4  Ge n e r a l   Ma l l   10 1 2 3   No r t h   Wo l f e   Ro a d   31 6 ‐20 ‐ 10 7  31 6 ‐ 20 ‐08 1   31 6 ‐20 ‐ 08 1   C/ R   C/ R e g i o n a l   Sh o p p i n g / O /R   P( R e g i o n a l   Sh o p p i n g   CG )   P( R e g i o n a l   Sh o p p i n g ,   OP M P ,   Re s )   35   du / a c   35 du/ac 60 feet 60 feet 75 feeta 85 feetb  5  Pa r k i n g   Ga r a g e   N/ A   31 6 ‐20 ‐ 10 7   5. 4 4   ac   69 8   sp a c e s   C/ R   C/ R e g i o n a l   Sh o p p i n g / O /R   P( R e g i o n a l   Sh o p p i n g )   P( R e g i o n a l   Sh o p p i n g ,   OP M P ,   Re s )   35   du / a c   35 du/ac 60 feet 60 feet 75 feeta  6  Pa r k i n g   Ga r a g e   N/ A   31 6 ‐20 ‐ 10 6   3. 2 5   ac   70 9   sp a c e s   C/ R   C/ R e g i o n a l   Sh o p p i n g / O /R   P( R e g i o n a l   Sh o p p i n g )   P( R e g i o n a l   Sh o p p i n g ,   OP M P ,   Re s )   35   du / a c   35 du/ac 60 feet 60 feet 75 feeta  7  TG I   Fr i d a y ’ s   10 3 4 3   No r t h   Wo l f e   Ro a d   31 6 ‐20 ‐ 10 4   1. 0 0   ac   8, 9 6 0  sf C/ R   C/ R e g i o n a l   Sh o p p i n g / O /R   P( R e g i o n a l   Sh o p p i n g )   P( R e g i o n a l   Sh o p p i n g ,   OP M P ,   Re s )   35   du / a c   35 du/ac 60 feet 60 feet 75 feeta 85 feetb  8  Al e x a n d e r ’ s St e a k h o u s e  10 3 3 0   No r t h   Wo l f e   Ro a d   31 6 ‐20 ‐ 09 9   0. 8 6   ac   10 , 2 4 3   sf   C/ R   C/ R e g i o n a l   Sh o p p i n g / O /R   P( R e g i o n a l   Sh o p p i n g )   P( R e g i o n a l   Sh o p p i n g ,   OP M P ,   Re s )   35   du / a c   35 du/ac 60 feet 75 feet 90 feeta 160 feetc  13 7 3   No v e m b e r  3, 2014 | Page 5  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 9  Ma c y ’ s   10 3 3 3   Wo l f e   Ro a d   31 6 ‐20 ‐ 10 1   4. 5 7   ac   17 6 , 9 6 2   sf   C/ R   C/ R e g i o n a l   Sh o p p i n g / O /R   P( R e g i o n a l   Sh o p p i n g )   P( R e g i o n a l   Sh o p p i n g ,   OP M P ,   Re s )   35   du / a c   35 du/ac 60 feet 60 feet 75 feeta  10   Se a r s  St o r e   / Ba y  Cl u b   10 1 0 1   No r t h   Wo l f e   Ro a d   31 6 ‐20 ‐ 08 0   7. 6 4   ac   25 7 , 5 4 8   sf   C/ R   C/ R e g i o n a l   Sh o p p i n g / O /R   P( R e g i o n a l   Sh o p p i n g   CG )   P( R e g i o n a l   Sh o p p i n g ,   OP M P ,   Re s )   35   du / a c   35 du/ac 60 feet 60 feet 75 feeta 85 feetd  11   Au t o   Ce n t e r   10 1 0 1   No r t h   Wo l f e   Ro a d   31 6 ‐20 ‐ 08 2   4. 7 8   ac   15 , 5 5 6   sf   C/ R   C/ R e g i o n a l   Sh o p p i n g / O /R   P( R e g i o n a l   Sh o p p i n g   CG )   P( R e g i o n a l   Sh o p p i n g ,   OP M P ,   Re s )   35   du / a c   35 du/ac 60 feet 60 feet 75 feeta 85 feete  12   Pa r k i n g   Ga r a g e   N/ A   31 6 ‐20 ‐ 08 1   3. 6 8   ac   41 8   sp a c e s   C/ R   C/ R e g i o n a l   Sh o p p i n g / O /R   P( R e g i o n a l   Sh o p p i n g   CG )   P( R e g i o n a l   Sh o p p i n g ,   OP M P ,   Re s )   35   du / a c   35 du/ac 60 feet 60 feet 75 feeta  13   JC  Pe n n e y   10 1 5 0   No r t h   Wo l f e   Ro a d   31 6 ‐20 ‐ 09 4   10 . 0 8   ac   20 2 , 3 6 0   sf   C/ R   C/ R e g i o n a l   Sh o p p i n g / O /R   P( R e g i o n a l   Sh o p p i n g )   P( R e g i o n a l   Sh o p p i n g ,   OP M P ,   Re s )   35   du / a c   35 du/ac 60 feet 75 feet 90 feeta 160 feetc  14   Pa r k i n g   Ga r a g e   N/ A   31 6 ‐20 ‐ 09 5   2. 7 3   ac   72 5   sp a c e s   C/ R   C/ R e g i o n a l   Sh o p p i n g / O /R   P( R e g i o n a l   Sh o p p i n g )   P( R e g i o n a l   Sh o p p i n g ,   OP M P ,   Re s )   35   du / a c   35 du/ac 60 feet 75 feet 90 feeta 160 feetc  15   Ro s e b o w l   Bo w l   Mi x e d ‐Us e   10 0 8 8  N.   Wo l f e   Ro a d   31 6 ‐20 ‐ 10 8   5. 8 5   ac   59 , 8 2 7   sf   20 4   un i t s   C/ R   C/ R   P( C G ,  OP ,   ML ,  Re s )   P( R e g i o n a l   Sh o p p i n g )   P( C G ,  OP ,   ML ,  Re s )   P( R e g i o n a l   Sh o p p i n g ,   MP ,  Re s )   35   du / a c   35 du/ac 60 feet 75 feet 90 feeta  16   KC R   De v e l o p m en t   N/ A   31 6 ‐20 ‐ 09 2   2. 1 2   ac   va c a n t   C/ R   C/ R e g i o n a l   Sh o p p i n g / O /R   P( R e g i o n a l   Sh o p p i n g )   P( R e g i o n a l   Sh o p p i n g ,   OP M P ,   Re s )   35   du / a c   35 du/ac N/A 75 feet 90 feeta 160 feetc  13 7 4   No v e m b e r  3, 2014 | Page 6  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 17   Si m e o n   N/ A   31 6 ‐20 ‐ 08 8   5. 1 8   ac   va c a n t   C/ R   C/ R e g i o n a l   Sh o p p i n g / O /R   P( R e g i o n a l   Sh o p p i n g )   P( R e g i o n a l   Sh o p p i n g ,   OP M P ,   Re s )   35   du / a c   35 du/ac N/A 60 feet 75 feeta  To t a l        63 . 0 1   ac   1, 2 6 7 , 6 0 1  sf   2, 5 5 0  pa r k i n g  ga r a g e  sp a c e s  (d o e s  no t  in c l u d e  su r f a c e  sp a c e s )   20 4  un i t s   No t e :  sf  = sq u a r e  fe e t ,  ac  = ac r e s ,  du / a c  = dw e l l i n g  un i t s  pe r  ac r e ,  N/ A  = no t  ap p l i c a b l e   Ge n e r a l  Pl a n  De s i g n a t i o n s :  C/ O / R  = Co m m e r c i a l / O f f i c e / R e s i d e n t i a l ,  C/ R  = Co m m e r c i a l / R e s i d e n t i a l   Zo n i n g  de s i g n a t i o n s :  P( R e g i o n a l  Sh o p p i n g )  = Pl a n n e d  De v e l o p m e n t ,  P( R e g i o n a l  Sh o p p i n g ,  OP ,  Re s )  = Pl a n n e d  De v e l o p m e n t  Re g i o n a l  Shopping, Planned  Of f i c e ,  Re s i d e n t i a l ,  MP  = In d u s t r i a l  Pa r k :   a.  wi t h  re t a i l .   b.  al o n g  Wo l f e  Ro a d  wi t h  re t a i l  an d  co m m u n i t y  be n e f i t s .   c.  wi t h  re t a i l  an d  co m m u n i t y  be n e f i t s .   d.  al o n g  St e v e n s  Cr e e k  Bo u l e v a r d  an d  Wo l f e  Ro a d  wi t h  re t a i l  an d  co m m u n i t y  be n e f i t s .   e.  al o n g  St e v e n s  Cr e e k  Bo u l e v a r d  wi t h  re t a i l  an d  co m m u n i t y  be n e f i t s .   So u r c e :  Ci t y  of  Cu p e r t i n o ,  20 1 4 .     3‐56   St u d y  Ar e a  7  (S t e v e n s  Cr e e k   Of f i c e  Ce n t e r )   As  sh o w n  in  Ta b l e  3‐16 ,  un d e r  th e  pr o p o s e d  Pr o j e c t ,  St u d y  Ar e a  7 (S t e v e n s  Cr e e k  Of f i c e  Ce n t e r )  co u l d  in c l u d e  ne w  hoteloffice,  co m m e r c i a l ,  an d  re s i d e n t i a l  mi x e d ‐us e  de v e l o p m e n t  wi t h  a ma x i m u m  he i g h t  of  60  fe e t ,  or  up  to  75  fe e t  if  a pr o j e c t  includes a retail  co m p o n e n t .  Mo s t  of  th i s  St u d y  Ar e a  (e x c e p t  Pe e t ’ s  Co f f e e  an d  Pa n e r a  Br e a d )  is  al s o  be i n g  co n s i d e r e d  as  Ho u s i n g  Element Site 15 (Stevens  Cr e e k  Of f i c e  Ce n t e r ) ,  wh i c h  is  di s c u s s e d  in  mo r e  de ta i l  be l o w  in  Se c t i o n  3. 7 . 4 . 1 5 .     3‐61   Mo n t a  Vi s t a  Vi l l a g e   Ne i g h b o r h o o d   Th e  Mo n t a  Vi s t a  Vi l l a g e  Ne i g h b o r h o o d  wa s  a fa r m i n g  an d  se c o n d  ho m e  co m m u n i t y  si n c e  th e  la t e r  18 0 0 s  an d  is  now a residential,  co m m e r c i a l ,  an d  in d u s t r i a l  ne i g h b o r h o o d .  As  sh o w n  on  Fi g u r e  3‐19 ,  th i s  ne i g h b o r h o o d  is  ce n t r a l l y  lo c a t e d  in  Cu p e r t i n o .  As shown in Table  3‐17 ,  th e r e  is  no  re m a i n i n g  de v e l o p m e n t  al l o c a t i o n  fo r  of f i c e  sp a c e  or  ho t e l  ro o m s ;  ho w e v e r ,  th e r e  is  co m m e r c i a l  allocation of 5,784  sq u a r e  fe e t  an d  re s i d e n t i a l  al l o c a t i o n  fo r  up  to  94 7 4  un i t s  at  12  du / a c .  Th e  ma x i m u m  he i g h t  in  th i s  ne i g h b o r h o o d  is 30 feet.  3‐69   Ta b l e  3‐21    Ta b l e  3‐21  Ho u s i n g  El e m e n t  Si t e s  Ex i s t i n g  an d  Pr o p o s e d  De v e l o p m e n t  St a n d a r d s             Ge n e r a l  Pl a n   Zo n i n g   Ma x i m u m  De n s i t y   (d u / a c )   Capacity (du/ac)  13 7 5   No v e m b e r  3, 2014 | Page 7  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e  Si t e   #  Ad d r e s s   AP N   Lo t  Ar e a   (a c r e s )   Ex i s t i n g  Us e   Ex i s t i n g   Pr o p o s e d   Ex i s t i n g   Pr o p o s e d   Ex i s t i n g   Pr o p o s e d  Existing Realist ic YieldNet 11   10 1 2 3  N.   Wo l f e  Rd .   10 1 5 0  N.   Wo l f e  Rd .   N.  Wo l f e   Rd   Va r i o u s   31 6 ‐20 ‐ 09 2   47 . 8 3   Co m m e r c ia l   C/ ‐/R   C/ R e g i o n a l   Sh o p p i n g / O /R   P( R e g i o n a l   Sh o p p i n g )   P( R e g i o n a l   Sh o p p i n g ,   OP M P ,   Re s )   35   35  0 800 800 15   20 8 2 3   St e v e n s   Cr e e k  Bl v d . 32 6 ‐32 ‐ 05 3   32 6 ‐32 ‐ 05 2  32 6 ‐ 32 ‐05 3   6. 3 1   Of f i c e   C/ O / R   C/ O / R   P( C G ,  Re s )   P( C G ,  OP ,   Re s )   25   40  0 214 214 18   21 2 5 5   St e v e n s   Cr e e k  Bl v d . 32 6 ‐27 ‐ 03 9   32 6 ‐27 ‐ 99 9   32 6 ‐27 ‐ 04 1   32 6 ‐27 ‐ 04 0     7. 9   Co m m e r c ia l   C/ O / R   C/ O / R   P( C G )   P( C G ,  OP ,   Re s )   25   35  0 235 235 No t e s :  AP N  = As s e s s o r ’ s  Pa r c e l  Nu m b e r ,  du / a c  = dw e l l i n g  un i t s  pe r  ac r e Zo n i n g  Ac r o n y m s :  P = Mi x e d ‐Us e  Pl a n n e d  De v e l o p m e n t ,  CG  = Ge n e r a l  Co m m e r c i a l ,  Re s  = Re s i d e n t i a l ,  OP  = Of f i c e / P l a n n e d  Of f i c e ,  MP  = Light Industrial:   Ge n e r a l  Pl a n  Ac r o n y m s :  C/ R  = Co m m e r c i a l / R e s i d e n t i a l ,  C/ O / R  = Co m m e r c i a l / O f f i c e / R e s i d e n t i a l   a.  Wh i l e  th i s  ta b l e  sh o w s  a re a l i s t i c  yi e l d  of  4, 8 0 4  re s i d e n t i a l  un i t s  (w h i c h  is  85  pe r c e n t  of  th e  ma x i m u m  5, 6 5 1  un i t s ) ,  as  sh o w n  in  Ta b l e  3‐2 in Section 3.7 of this chapter,  th e  pr o p o s e d  Pr o j e c t  al l o w s  a ma x i m u m  of  4, 4 2 1  re s i d e n t i a l  un i t s .  Th e  ho u s i n g  si t e s  in  th i s  ta b l e  ar e  be i n g  ev a lu a t e d  in  th i s  Dr a f t  EI R  to  provide a broad evaluation to aid  in  th e  Ci t y ’ s  ul t i m a t e  se l e c t i o n  of  ho u s i n g  si t e s  to  be  in c l u d e d  in  th e  Ho u s i n g  El e m e n t .  Th e  ma x i m u m  ho u s i n g  th a t  wo u l d  be  pe r m i t t e d  under the proposed Project is 4,42 un i t s .   So u r c e :  Ci t y  of  Cu p e r t i n o ,  20 1 4 .   3‐80   Ho u s i n g  El e m e n t   Si t e  5 (G l e n b r o o k   Un d e r  th e  pr o p o s e d  Pr o j e c t ,  th e r e  wo u l d  be  no  ch a n g e s  to  th e  Ge n e r a l  Pl a n  la n d  us e  de s i g n a t i o n ,  zo n i n g ,  or  de n s i t y .  However, the  pe r m i t t e d  he i g h t  wo u l d  be  in c r e a s e d  by  15  fe e t .  As  sh o w n  in  Ta b l e  3‐21 ,  fu t u r e  de v e l o p m e n t  un d e r  th e  pr o p o s e d  Project could result in  13 7 6   No v e m b e r  3, 2014 | Page 8  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e Ap a r t m e n t s )   up  to  93  ne w  re s i d e n t i a l  un i t s ad d e d  to  th e  ex i s t i n g  51 7  un i t s ,  fo r  a to t a l  of  61 0  un i t s . 3‐82   Ho u s i n g  El e m e n t   Si t e  6 (T h e  Vi l l a g e s   Ap a r t m e n t s )   Un d e r  th e  pr o p o s e d  Pr o j e c t ,  th e r e  wo u l d  be  no  ch a n g e s  to  th e  Ge n e r a l  Pl a n  la n d  us e  de s i g n a t i o n ,  zo n i n g ,  or  de n s i t y .  As shown in Table 3‐ 21 ,  fu t u r e  de v e l o p m e n t  un d e r  th e  pr o p o s e d  Pr o j e c t  co u l d  re s u l t  in  up  to  62  ne t  re s i d e n t i a l  un i t s  ad d e d  to  th e  ex i s t i n g  468 units, for a total  of  53 0  un i t s .   3‐90   Ho u s i n g  El e m e n t   Si t e  6 (T h e  Vi l l a g e s   Ap a r t m e n t s )   As  sh o w n  in  Ta b l e  3‐21 ,  fu t u r e  de v e l o p m e n t  un d e r  th e  pr o p o s e d  Pr o j e c t  co u l d  re s u l t  in  up  to  82 0  ne t  re s i d e n t i a l  units added to the  ex i s t i n g  34 2  un i t s ,  fo r  a to t a l  of  1, 1 6 2  un i t s .   3‐92   Ho u s i n g  El e m e n t   Si t e  11  (V a l l c o   Sh o p p i n g  Di s t r i c t   Ex c e p t  Ro s e b o w l )   Un d e r  th e  pr o p o s e d  Pr o j e c t ,  th e  Ge n e r a l  Pl a n  la n d  us e  de s i g n a t i o n  wo u l d  be  ch a n g e d  fr o m  Co m m e r c i a l / R e s i d e n t i a l  (C/R) to  Co m m e r c i a l R e g i o n a l  Sh o p p i n g / O f f i c e / R e s i d e n t i a l  (C R e g i o n a l  Sh o p p i n g / O / R )  an d  th e  Zo n i n g  de s i g n a t i o n  wo u l d  be changed from Planned  De v e l o p m e n t  wi t h  Re g i o n a l  Sh o p p i n g  (P ( R e g i o n a l  Sh o p p i n g )  to  Pl a n n e d  De v e l o p m e n t  wi t h  Re g i o n a l  Sh o p p i n g ,  Professional Office Light  In d u s t r i a l ,  an d  Re s i d e n t i a l  (P ( R e g i o n a l  Sh o p p i n g ,  OM P ,  Re s ) )  to  al l o w  fo r  pr o f e s s i o n a l  of f i c e s  an d  re s i d e n t i a l  us e s .  The permitted  re s i d e n t i a l  de n s i t y  wo u l d  re m a i n  35  du / a c ,  an d  th e  ma x i m u m  he i g h t  wo u l d  be  16 0  fe e t  in  th e  ar e a  bo u n d e d  by  I‐280 to the north, Vallco  Pa r k w a y  to  th e  so u t h ,  an d  Pe r i m e t e r  Ro a d  to  th e  ea s t  if  fu t u r e  de v e l o p m e n t  in c l u d e s  a re t a i l  co m p o n e n t  an d  pr o v i d e s  community  be n e f i t s .  As  sh o w n  in  Ta b l e  3‐21 ,  fu t u r e  de v e l o p m e n t  un d e r  th e  pr o p o s e d  Pr o j e c t  co u l d  re s u l t  in  up  to  80 0  ne t  residential units.  3‐10 0   Ho u s i n g  El e m e n t   Si t e  15  (S t e v e n s   Cr e e k  Of f i c e  Ce n t e r )    Th i s  Si t e  co m p r i s e s  on e  th r e e  pa r c e l s  to t a l i n g  6. 3 1  ac r e s .  Th i s  Si t e  is  wi t h i n  th e  Co m m e r c i a l / O f f i c e /  Re s i d e n t i a l  (C / O / R )  General Plan land  us e  de s i g n a t i o n  an d  zo n e d  as  Pl a n n e d  De v e l o p m e n t  wi t h  Ge n e r a l  Co m m e r c i a l  an d  Re s i d e n t i a l  (P ( C G ,  Re s ) )  wi t h  a maximum residential  de n s i t y  of  25  du / a c  an d  he i g h t  li m i t  of  45  fe e t .   3‐10 4   Ho u s i n g  El e m e n t   Si t e  16   (S u m m e r w i n d s  &  Gr a n i t e  Ro c k )   Un d e r  th e  pr o p o s e d  Pr o j e c t ,  th e r e  wo u l d  be  no  ch a n g e s  to  th e  Ge n e r a l  Pl a n  la n d  us e  de s i g n a t i o n ;  ho w e v e r ,  th e  Zoning designation would  be   am e n d e d   to   Pl a n n e d   De v e l o p m e n t   wi t h   Ge n e r a l   Co m m e r c i a l   an d   Re s i d e n t i a l   (P ( C G ,   Re s ) )   to   al l o w   fo r   re s i d e n t i a l  uses. The permitted  re s i d e n t i a l   de n s i t y   wo u l d   be   in c r e a s e d   to   40   du / ac   an d  th e   ma xi m u m   he i g h t   wo u l d   re m a i n   30   fe e t   be   45   fe e t .  As shown in Table 3‐21,  fu t u r e  de v e l o p m e n t  un d e r  th e  pr o p o s e d  Pr o j e c t  co u l d  re s u l t  in  up  to  15 4  ne t  re s i d e n t i a l  un i t s .     3‐10 6   Ho u s i n g  El e m e n t   Si t e  18  (T h e  Oa k s   Sh o p p i n g  Ce n t e r )   Th i s  Si t e  ha s  fo u r  pa r c e l s  to t a l i n g  7. 9  ac r e s ,  is  de s i g n a t e d  as  Co m m e r c i a l / O f f i c e / R e t a i l  (C / O / R ) C o m m e r c i a l / R e s i d e n t i a l  (C/R) under the  cu r r e n t  Ge n e r a l  Pl a n ,  an d  is  zo n e d  Pl a n n e d  De v e l o p m e n t  wi t h  Ge n e r a l  Co m m e r c i a l  an d  Pr o f e s s i o n a l  Of f i c e  (P ( C G ,  OP)). The maximum  re s i d e n t i a l  de n s i t y  cu r r e n t l y  pe r m i t t e d  on  th e  Si t e  is  25  du / a c ,  wi t h  a ma x i m u m  he i g h t  of  45  fe e t .   13 7 7   No v e m b e r  3, 2014 | Page 9  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e Th i s  Si t e  is  oc c u p i e d  by  th e  Oa k s  Sh o p p i n g  Ce n t e r .  Th e  ce n t e r  ha s  va r i o u s  sm a l l  sc a l e  co m m e r c i a l  an d  re s t a u r a n t  tenants and one of the  Ci t y ’ s  tw o  mo v i e  th e a t e r s ,  Bl u e  Li g h t  Ci n e m a .  Th e  pr o p e r t y  ha s  en t i t l e m e n t s  fo r  a mi x e d ‐us e  of f i c e / c o m m e r c i a l  building and a hotel which  ex p i r e  in  Se p t e m b e r  20 1 4 .  Th i s  Si t e  pr e s e n t s  a st r o n g  po t e n t i a l  fo r  re d e v e l o p m e n t  wi t h  a mi x e d ‐us e  pr o d u c t  in c l u d i n g  residential units  ba s e d  on  it s  la r g e  si z e ,  po t e n t i a l  re s i d e n t i a l  ca p a c i t y ,  cu r r e n t  en t i t l e m e n t s  an d  pr o p e r t y  ow n e r  in t e r e s t ,  ad j a c e n t  freeway access and  lo c a t i o n  ad j a c e n t  to  re s i d e n t i a l  de v e l o p m e n t .   Cu p e r t i n o  Me m o r i a l  Pa r k  is  lo c a t e d  ac r o s s  th e  st r e e t  on  Ma r y  Av e n u e  to  th e  ea s t  an d  th e  Ma r y  Av e n u e  Do g  Pa r k  is located to the  no r t h w e s t .  Th e  Ci t y ’ s  Se n i o r  Ce n t e r  is  lo c a t e d  ad j a c e n t  to  Me m o r i a l  Pa r k .  Ga r d e n  Ga t e  El e m e n t a r y  Sc h o o l  an d  Homestead High School are  lo c a t e d  ap p r o x i m a t e l y  th r e e ‐qu a r t e r s  of  a mi l e  to  th e  no r t h e a s t  an d  no r t h  of  th e  Si t e .  La w s o n  Mi d d l e  Sc h o o l ,  Mo n t a  Vista High, Lincoln  El e m e n t a r y  Sc h o o l  an d  Jo h n  F.  Ke n n e d y  Mi d d l e  Sc h o o l  in  Cu p e r t i n o  ar e  in  pr o x i m i t y  of  th i s  Si t e .    Pr o p o s e d  Pr o j e c t   Un d e r  th e  pr o p o s e d  Pr o j e c t ,  th e r e  wo u l d  be  no  ch a n g e s  to  th e  Ge n e r a l  Pl a n  la n d  us e  de s i g n a t i o n ;  ho w e v e r ,  th e  Zoning designation would  be  am e n d e d  to  Pl a n n e d  De v e l o p m e n t  wi t h  Ge n e r a l  Co m m e r c i a l ,  an d  Re s i d e n t i a l ,  an d  Pr o f e s s i o n a l  Of f i c e  (P ( C G ,  Res, OP)) to allow for  fu t u r e  mi x e d ‐us e  de v e l o p m e n t  in c l u d i n g  re s i d e n t i a l  us e s .  Un d e r  th e  pr o p o s e d  Pr o j e c t ,  th e  pe r m i t t e d  re s i d e n t i a l  density would be  in c r e a s e d  to  35  du / a c  an d  bu i l d i n g  he i g h t s  wo u l d  ra n g e  fr o m  60  fe e t  to  75  fe e t  wi t h  a re t a i l  co m p o n e n t .  As  sh o w n  in Table 3‐21, future  de v e l o p m e n t  un d e r  th e  pr o p o s e d  Pr o j e c t  co u l d  re s u l t  in  up  to  23 5  ne t  re s i d e n t i a l  un i t s .   3‐11 2   Ge n e r a l  Pl a n  La n d   Us e  Ma p  an d  Zo n i n g   Ma p  Co n f o r m a n c e   No t e   th a t   th e   fo l l o w i n g   ad d i t i o n s ,   si m i l a r   to   th e   ot h e r   93   pa r c e l s   id e n t i f i e d   in   Ta b l e   3‐22 ,   ha v e   be e n   ma d e   to   bring consistency between  th e   ex i s t i n g   us e   an d   th e   Ge n e r a l   Pl a n   la n d   us e   an d / o r   Zo n i n g   fo r   th e   lo c a t i o n   an d   wi l l   no t   re s u l t   in   ne w   de v e l o p m ent potential at these  lo c a t i o n s .      TAB L E  3‐22   GEN E R A L  PLA N  AN D  ZON I N G  ORD I N A N C E  CON F O R M A N C E  SIT E S   Ma p   #  Ad d r e s s   AP N   La n d  Us e   Zo n i n g   Reason  Ex i s t i n g   Pr o p o s e d   Ex i s t i n g   Pr o p o s e d   94   20 4 5 5  Si l v e r a d o   Av e .   36 9 ‐39 ‐01 6 Lo w  De n s i t y   (1 ‐5 du / a c )   Co m m e r c i a l /   Re s i d e n t i a l   P( C G )   P( C G )   Co n s i s t e n c y  with GP. Allows  th e  Chamber of Commerce to  co n t i n u e  to operate at this location.  13 7 8   No v e m b e r  3, 2014 | Page 10  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 95   22 2 4 1  Mc C l e l l a n  Rd . 35 7  06  01 4 Pa r k s  an d    Op e n  Sp a c e   Pa r k s  an d   Op e n  Sp a c e   R1 ‐10   PR   Consistency with GP.  96   22 2 4 0  Sc e n i c  Ci r .   35 7  07  02 9 Pa r k s  an d    Op e n  Sp a c e   Pa r k s  an d   Op e n  Sp a c e   R1 ‐7. 5   PR   Consistency with GP.  97     35 7  06  01 9 Pa r k s  an d    Op e n  Sp a c e   Pa r k s  an d   Op e n  Sp a c e   R1 ‐7. 5   PR   Consistency with GP.  98     32 6  49  04 0 Pu b l i c  Fa c i l i t i e s Pa r k s  an d   Op e n  Sp a c e   R1 ‐10    PR   Consistency with GP.    3‐11 6   Fi g u r e  3‐40   Fi g u r e   3‐40 ,   Ge n e r a l   Pl a n   an d   Zo n i n g   Or d i n a n c e   Co n f o r m a n c e   Si t e s ,   ha s   be e n   re v i s e d   to   in c l u d e   th e   fo u r   ad d i t i o n a l  conformance sites  de s c r i b e d  ab o v e .    Th e  re v i s e d  fi g u r e  ha s  be e n  in c l u d e d  at  th e  en d  of  th i s  ta b l e .   Ch a p t e r  4. 1 :  Ae s t h e t i c s    of  th e  Dr a f t  EI R   4. 1 ‐8  Sp e c i a l  Ar e a s    al o n g  Ma j o r   Tr a n s p o r t a t i o n   Co r r i d o r s  In c l u d i n g   Ga t e w a y s  an d   No d e s   Th e  fi v e  Sp e c i a l  Ar e a s ,  in c l u d i n g  th e  Ga t e w a y s /  No d e s  re p r e s e n t  ke y  lo c a t i o n s  in  th e  ci t y  wh e r e  in t e n s i f i e d  de v e l o p m e n t  could occur under  th e  pr o p o s e d  Pr o j e c t .  Th e  Sp e c i a l  Ar e a s  ar e  sh o w n  on  Fi g u r e  3‐43 ‐5,  of  th i s  Dr a f t  EI R .  Th e  Sp e c i a l  Ar e a s  in c l u d e  major arterials in the city,  ne a r  fr e e w a y s ,  ca p t u r i n g  th e  Cu p e r t i n o ’ s  mo s t  cu l t u r a l  an d  ec o n o m i c  co r e s .  Th e  Sp e c i a l  Ar e a s  al s o  in c l u d e s  a va r i e t y  of uses, including  of f i c e ,  co m m e r c i a l ,  in d u s t r i a l ,  an d  re s i d e n t i a l .   4. 1 ‐33   Im p a c t  AE S ‐3:  Oa k s   Ga t e w a y / H o u s i n g   El e m e n t  Si t e  18   (T h e  Oa k s  Sh o p p i n g   Ce n t e r )   Th e  Oa k s  Ga t e w a y  is  co t e r m i n o u s  wi t h  Ho u s i n g  El e m e n t  Si t e  18  (T h e  Oa k s  Sh o p p i n g  Ce n t e r )  lo c a t e d  on  th e  no r t h  side of Stevens Creek  Bo u l e v a r d  be t w e e n  SR  85  an d  Ma r y  Av e n u e .  Un d e r  th e  pr o p o s e d  Pr o j e c t ,  th e r e  wo u l d  be  no  ch a n ge s  to  th e  Ge n e r al Plan land use  de s i g n a t i o n ;  ho w e v e r ,  th e  Zo n i n g  de s i g n a t i o n  wo u l d  be  am e n d e d  to  Pl a n n e d  De v e l o p m e n t  wi t h  Ge n e r a l  Co m m e r c i a l  and Residential  (P ( C G ,  Re s ) )  to  al l o w  fo r  fu t u r e  mi x e d ‐us e  de v e l o p m e n t  in c l u d i n g  re s i d e n t i a l  us e s .  Un d e r  th e  pr o p o s e d  Pr o j e c t ,  the permitted residential  de n s i t y  wo u l d  in c r e a s e  to  35  dw e l l i n g  un i t s  pe r  ac r e  an d  bu i l d i n g  he i g h t s  wo u l d  ra n g e  fr o m  60  fe e t  to  up  to  75  fe e t  with a retail  co m p o n e n t .  Be c a u s e  th i s  Pr o j e c t  Co m p o n e n t  lo c a t i o n  is  wi t h i n  th e  ex i s t i n g  1‐st o r y  Oa k s  Sh o p p i n g  Ce n t e r ,  wh i c h  currently has  en t i t l e m e n t s  fo r  a mi x e d ‐us e  of f i c e / c o m m e r c i a l  bu i l d i n g  an d  a ho t e l  wh i c h  ex p i r e  in  Se p t e m b e r  20 1 4 ,  an d  is  su r r o u n d e d  by urban land  us e s  an d  SR  85  to  th e  we s t ,  fu t u r e  de v e l o p m e n t  pe r m i t t e d  un d e r  th e  pr o p o s e d  Pr o j e c t  wo u l d  no t  ad v e r s e l y  im p a c t  the visual character of  th e  Si t e  or  it s  su r r o u n d i n g s .  Th u s ,  im p a c t s  fr o m  ne w  de v e l o p m e n t  to  th e  vi s u a l  ch a r a c t e r  or  qu a l i t y  of  th e  si t e  or  surrounding areas would  be  le s s   t h a n   s i g n i f i c a n t .  13 7 9   No v e m b e r  3, 2014 | Page 11  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 4. 1 ‐33   Im p a c t  AE S ‐3:  No r t h   Cr o s s r o a d s  No d e /   St u d y  Ar e a  7  (S t e v e n s  Cr e e k   Of f i c e  Ce n t e r ) /   Ho u s i n g  El e m e n t   Si t e s  14  (M a r i n a   Pl a z a )  an d  15   (S t e v e n s  Cr e e k   Of f i c e  Ce n t e r )   Un d e r  th e  pr o p o s e d  Pr o j e c t ,  de v e l o p m e n t  wi t h i n  St u d y  Ar e a  7 (S t e v e n s  Cr e e k  Of f i c e  Ce n t e r ) ,  wh i c h  is  co t e r m i n o u s  with Housing Element  Si t e  15 ,  co u l d  in c l u d e  ne w  ho t e l o f f i c e ,  co m m e r c ia l , an d  re s i d e n t i a l  mi x e d ‐us e  de v e l o p m e n t  wi t h  a ma x i m u m  he i g h t  of 60 feet, or up to 75  fe e t  if  a pr o j e c t  in c l u d e s  a re t a i l  co m p o n e n t .  Th e r e  wo u l d  be  no  ch a n g e s  to  th e  Ge n e r a l  Pl a n  la n d  us e  de s i g n a t i o n ;  however, the Zoning  de s i g n a t i o n  wo u l d  be  am e n d e d  to  Pl a n n e d  De v e l o p m e n t  wi t h  Ge n e r a l  Co m m e r c i a l ,  Pr o f e s s i o n a l  Of f i c e  an d  Re s i d e n t i a l  (P(CG, OP. Res.))    4. 1 ‐35   Im p a c t  AE S ‐3:  Ot h e r   Ho u s i n g  El e m e n t   Si t e  5 (G l e n b r o o k   Ap a r t m e n t s )   Un d e r  th e  pr o p o s e d  Pr o j e c t ,  th e r e  wo u l d  be  no  ch a n g e s  to  th e  Ge n e r a l  Pl a n  la n d  us e  de s i g n a t i o n ,  zo n i n g ,  or  de n s i t y .  However, the  pe r m i t t e d  he i g h t  wo u l d  be  in c r e a s e d  by  15  fe e t .  Be c a u s e  th i s  Si t e  is  cu r r e n t l y  de v e l o p e d  wi t h  hi g h ‐de n s i t y  ho u s i n g  comprised of  nu m e r o u s  2‐st o r y  st r u c t u r e s  an d  th e  pr o p o s e d  ne w  de v e l o p m e n t  co u l d  co n v e r t  th e  la r g e  ca r p o r t  ar e a s  to  gr o u n d  floor parking with new  un i t s  ab o v e  wi t h o u t  di s t u r b i n g  th e  ex i s t i n g  re s i d e n t s  or  su r r o u n d i n g  la n d  us e s ,  fu t u r e  de v e l o p m e n t  pe r m i t t e d  un d e r  the proposed Project  wo u l d  no t  ad v e r s e l y  im p a c t  th e  vi s u a l  ch a r a c t e r  of  th e  Si t e  or  it s  su r r o u n d i n g s ;  th u s  im p a c t s  wo u l d  be  le s s  th a n  significant.  4. 1 ‐35   Im p a c t  AE S ‐3:  Ot h e r   Ho u s i n g  El e m e n t   Si t e s   Un d e r  th e  pr o p o s e d  Pr o j e c t  th e r e  wo u l d  be  no  ch a n g e s  to  th e  Ge n e r a l  Pl a n  la n d  us e  de s i g n a t i o n  or  zo n i n g  at  Ho u s i n g  Element Sites 2  (A r y a / S c a n d i n a v i a n  De s i g n ) ,  3 (U n i t e d  Fu r n i t u r e / E a s t  of  Ea s t  Es t a t e s  Dr i v e ) ,  4 (B a r r y  Sw e n s o n ) ,  5 (G l e n b r o o k  Ap a r t m e n t s ) ,  13 (Loree  Sh o p p i n g  Ce n t e r )  an d  19  (C y p r e s s  Bu i l d i n g  As s o c i a t i o n  & Ha l l  Pr o p e r t y ) ;  th u s ,  im p a c t s  fr o m  fu t u r e  de v e l o p m e n t  permitted under the  pr o p o s e d  Pr o j e c t  wo u l d  no t  ad v e r s e l y  im p a c t  th e  vi s u a l  ch a r a c t e r  of  th e  Si t e  or  it s  su r r o u n d i n g s ;  th u s  im p a c t s  would be less than  si g n i f i c a n t .   4. 1 ‐35   Im p a c t  AE S ‐3:   Ho u s i n g  El e m e n t   Si t e  16   (S u m m e r w i n d s  &  Gr a n i t e  Ro c k )   Un d e r  th e  pr o p o s e d  Pr o j e c t ,  th e r e  wo u l d  be  no  ch a n g e s  to  th e  Ge n e r a l  Pl a n  la n d  us e  de s i g n a t i o n ;  ho w e v e r ,  th e  Zoning designation would  be  am e n d e d  to  Pl a n n e d  De v e l o p m e n t  wi t h  Ge n e r a l  Co m m e r c i a l  an d  Re s i d e n t i a l  (P ( C G ,  Re s ) )  to  al l o w  fo r  re s i d e n t i a l  uses. The permitted  de n s i t y  wo u l d  in c r e a s e  to  40  dw e l l i n g  un i t s  pe r  ac r e  bu t  no ,  he i g h t  in c r e a s e s  wo u l d  be  oc c u r  li m i t e d  to  15  fe e t  (a p p r o x i m a t e l y  one story)  an d  th e  la n d  us e s  wo u l d  ge n e r a l l y  re m a i n  th e  sa m e ;  th u s ,  fu t u r e  de v e l o p m e n t  pe r m i t t e d  un d e r  th e  pr o p o s e d  Pr o j e c t  would not adversely  im p a c t  th e  vi s u a l  ch a r a c t e r  of  th e  Si t e  or  it s  su r r o u n d i n g s ;  th u s  im p a c t s  wo u l d  be  le s s  th a n  si g n i f i c a n t .   13 8 0   No v e m b e r  3, 2014 | Page 12  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e Ch a p t e r  4. 2 :  Ai r  Qu a l i t y  of  th e  Dr a f t  EI R   4. 2 ‐16   Ex i s t i n g  Am b i e n t  Ai r   Qu a l i t y   Ex i s t i n g  le v e l s  of  am b i e n t  ai r  qu a l i t y  an d  hi s t o r i c a l  tr e n d s  an d  pr o j e c t i o n s  in  th e  vi c i n i t y  of  Cu p e r t i n o  ha v e  be e n  documented by  me a s u r e m e n t s  ma d e  by  th e  BA A Q M D .  In  ad d i t i o n  to  24  pe r m a n e n t  mo n i t o r i n g  st a t i o n s  lo c a t e d  ar o u n d  th e  Ba y  Area, BAAQMD has a  sp e c i a l  mo n i t o r i n g  st a t i o n  lo c a t e d  in  Cu p e r t i n o  at  th e  Mo n t a  Vi s t a  Pa r k  on  Fo o t h i l l  Bo u l e v a r d .  Th i s  Sp e c i a l  Pu r p o s e  Monitoring Station  st a r t e d  op e r a t i n g  in  Se p t e m b e r  20 1 0 .  Th e r e f o r e ,  fo r  ye a r s  pr i o r  to  20 1 0 ,  da t a  fr o m  th e  Sa n  Jo s e  Ja c k s o n  St r e e t  Monitoring Station was  us e d  in  th i s  an a l y s i s .  Da t a  fr o m  th e s e  st a t i o n s  ar e  su m m a r i z e d  in  Ta b l e  4. 2 ‐4.  Th e  da t a  sh o w  oc c a s i o n a l  vi o l a t i o n s  of the State and federal  O3 st a n d a r d s .  Th e  fe d e r a l  PM 2 . 5  st a n d a r d s  ha v e  be e n  ex c e e d e d  on  fi v e  da y s ,  an d  st a t e  PM 10  st a n d a r d s  ha v e  be e n  exceeded once on one  da y ,  wi t h i n  th e  la s t  fi v e  ye a r s .  Th e  St a t e  an d  fe d e r a l  CO  an d  NO 2  st a n d a r d s  ha v e  no t  be e n  ex c e e d e d  in  th e  la s t  fi v e  years in the vicinity of  th e  ci t y .   4. 2 ‐65   Si t i n g  Ne w  Od o r   So u r c e s   Bu i l d o u t  pe r m i t t e d  un d e r  th e  pr o p o s e d  Pr o j e c t  co u l d  in c l u d e  ne w  so u r c e s  of  od o r s ,  su c h  as  co m p o s t i n g ,  gr e e n w a s t e ,  and recycling  op e r a t i o n s ;  fo o d  pr o c e s s i n g ;  ch e m i c a l  ma n u f a c t u r i n g ;  an d  pa i n t i n g / c o a t i n g  op e r a t i o n s ,  be c a u s e  th e s e  ar e  pe r m i t t e d  uses in the  co m m e r c i a l  an d / o r  in d u s t r i a l  ar e a s  in  th e  ci t y .  Fu t u r e  en v i r o n m e n t a l  re v i e w  co u l d  be  re q u i r e d  fo r  in du s t r i a l  pr o j e c t s  listed in Table 4.2‐ 84 . 2 ‐9,  ab o v e ,  to  en s u r e  th a t  se n s i t i v e  la n d  us e s  ar e  no t  ex p o s e d  to  ob j e c t i o n a b l e  od o r s .  BA A Q M D  Re g u l a t i o n  7, Odorous Substances,  re q u i r e s  ab a t e m e n t  of  an y  nu i s a n c e  ge n e r a t i n g  an  od o r  co m p l a i n t .  Ty p i c a l  ab a t e m e n t  in c l u d e s  pa s s i n g  ai r  th r o u g h  a drying agent followed  by  tw o  su c c e s s i v e  be d s  of  ac t i v a t e d  ca r b o n  to  ge n e r a t e  od o r ‐fr e e  ai r .  Fa c i l i t i e s  li s t e d  in  Ta b l e  4. 2 ‐10  wo u l d  ne e d  to consider measures to  re d u c e  od o r s  as  pa r t  of  th e i r  CE Q A  re v i e w .   Ch a p t e r  4. 3 :  Bi o l o g i c a l  Re s o u r c e s  of  th e  Dr a f t  EI R   4. 3 ‐13   Im p a c t  BI O ‐3  De v e l o p m e n t  an d  la n d  us e  ac t i v i t i e s  co n s i s t e n t  wi t h  th e  pr o p o s e d  Pr o j e c t  Co m p o n e n t s  wo u l d  oc c u r  in  ur b a n i z e d  areas where  ju r i s d i c t i o n a l  wa t e r s  ar e  ab s e n t .  In d i r e c t  im p a c t s  to  we t l a n d s  an d  ju r i s d i c t i o n a l  ot h e r  wa t e r s  in c l u d e :  1)  an  in c r e a s e  in the potential for  se d i m e n t a t i o n  du e  to  co n s t r u c t i o n  gr a d i n g  an d  gr o u n d  di s t u r b a n c e ,  2)  an  in c r e a s e in  th e  po t e n t i a l fo r  er o s i o n  du e  to increased runoff  vo l u m e s  ge n e r a t e d  by  im p e r v i o u s  su r f a c e s ,  an d  3)  an  in c r e a s e  in  th e  po t e n t i a l  fo r  wa t e r  qu a l i t y  de g r a d a t i o n  du e  to increased levels in  no n ‐po i n t  po l l u t a n t s .  Ho w e v e r ,  in d i r e c t  im p a c t s  co u l d  be  la r g e l y  av o i d e d  th r o u g h  ef f e c t i v e  im p l e m e n t a t i o n  of  Be s t  Management Practices  (B M P )  du r i n g  co n s t r u c t i o n  an d  co m p l i a n c e  wi t h  wa t e r  qu a l i t y  co n t r o l s .  As  di s c u s s e d  in  Se c t i o n  4. 8 . 1 . 1 ,  Re g u l a t o r y  Framework, of Chapter  4. 9 4 . 8 ,  Hy d r o l o g y  an d  Wa t e r  Qu a l i t y ,  of  th i s  Dr a f t  EI R ,  wa t e r  qu a l i t y  in  st o r m w a t e r  ru n o f f  is  re g u l a t e d  lo c a l l y  by  the Santa Clara Valley  Ur b a n  Ru n o f f  Po l l u t i o n  Pr e v e n t i o n  Pr o g r a m ,  wh i c h  in c l u d e s  pr o v i s i o n  C. 3  of  th e  Mu n i c i p a l  Re g i o n a l  St o r m  Wa t e r  National Pollutant  Di s c h a r g e  El i m i n a t i o n  Sy s t e m  (N P D E S )  Pe r m i t  (M R P )  ad o p t e d  by  th e  Sa n  Fr a n c i s c o  Ba y  RW Q C B .    13 8 1   No v e m b e r  3, 2014 | Page 13  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 4. 3 ‐14   Im p a c t  BI O ‐6  BI O ‐6  Im p l e m e n t a t i o n  of  th e  No  Pr o j e c t  pr o p o s e d  Pr o j e c t ,  in  co m b i n a t i o n  wi t h  pa s t ,  pr e s e n t ,  an d  reasonably foreseeable  pr o j e c t s ,  wo u l d  no t  re s u l t  in  si g n i f i c a n t  cu m u l a t i v e  im p a c t s  wi t h  re s p e c t  to  bi o l o g i c a l  re s o u r c e s .     Ch a p t e r  4. 6 :  Gr e e n h o u s e  Ga s  Em i s s i o n s  of  th e  Dr a f t  EI R 4. 6 ‐30   Im p a c t  GH G ‐1  Th e  Ge n e r a l  Pl a n  es t a b l i s h e s  th e  fr a m e w o r k  fo r  fu t u r e  gr o w t h  an d  de v e l o p m e n t  in  Cu p e r t i n o .  A Ge n e r a l  Pl a n  do e s  not directly result in  de v e l o p m e n t  wi t h o u t  ad d i t i o n a l  ap p r o v a l s .  Be f o r e  an y  de v e l o p m e n t  ca n  oc c u r  in  th e  Ci t y ,  it  is  re q u i r e d  to  be  an a l y z e d  for consistency with  th e  Ge n e r a l  Pl a n ,  zo n i n g  re q u i r e m e n t s ,  an d  ot h e r  ap p l i c a b l e  lo c a l  an d  st a t e  re q u i r eme n t s ;  co m p l y  wi t h  th e  re q u i r e m e n t s  of CEQA; and  ob t a i n  al l  ne c e s s a r y  cl e a r a n c e s  an d  pe r m i t s .    As  id e n t i f i e d  in  Ta b l e s  4. 5 ‐54 . 6 ‐5 an d  4. 5 ‐64 . 6 ‐6,  th e  pr o p o s e d  Pr o j e c t  would achieve the  20 2 0  an d  20 3 5  pe r f o r m a n c e  cr i t e r i a ,  re s p e c t i v e l y ,  wh i c h  wo u l d  en s u r e  th a t  th e  Ci t y  is  on  a tr a j e c t o r y  th a t  is  co n s i s t e n t  with the statewide  GH G  re d u c t i o n  go a l s .  Co n s e q u e n t l y ,  sh o r t ‐te r m  an d  lo n g ‐te r m  GH G  em i s s i o n s  im p a c t s  of  th e  pr o p o s e d  Pr o j e c t  are less than significant.  Ch a p t e r  4. 7 :  Ha z a r d s  an d  Ha z a r d o u s  Ma t e r i a l s  of  th e  Dr a f t  EI R 4. 7 ‐15   Wi l d l a n d  Fi r e   Ha z a r d   CA L  FI R E  ev a l u a t e s  fi r e  ha z a r d  se v e r i t y  ri s k s  ac c o r d i n g  to  ar e a s  of  re s p o n s i b i l i t y  (i . e .  fe d e r a l ,  st a t e ,  an d  lo c a l ) .  Ac c o r d i n g  to CAL FIRE, and as  de p i c t e d  on  Fi g u r e  4. 7 ‐2,  th e r e  ar e  no  ve r y  hi g h  fi r e  ha z a r d  se v e r i t y  zo n e s  wi t h i n  th e  Lo c a l  Re s p o n s i b i l i t y  Ar e a s  of Cupertino with the  ex c e p t i o n  of  a sm a l l  ar e a  ne a r  th e Ci t y ’ s  so u t h  ce n t e r  bo u n d a r y .    Al s o  as  de p i c t e d  on  Fi g u r e  4. 7 ‐3,  th e r e  ar e  no  moderate,  or high, and  ve r y  hi g h  fi r e  ha z a r d  se v e r i t y  zo n e s  in  th e  St a t e  Re s p o n s i b i l i t y  Ar e a s  in  th e  vi c i n i t y  of  th e  Pr o j e c t  co m p o n e n t s .    Furthermore, as discussed  ab o v e  in  Se c t i o n  4. 7 . 1 . 1 ,  Re g u l a t o r y  Se t t i n g ,  th e  Ci t y ’ s  Wi l d l a n d  Ur b a n  In t e r f a c e  Fi r e  Ar e a  ma p ,  as  sh o w n  on  Fi g u r e  4.7‐4 also identifies  th a t  th e r e  ar e  no  hi g h  or  ve r y  hi g h  fi r e  ri s k  ar e a s  in  th e  im m e d i a t e  vi c i n i t y  of  th e  Pr o j e c t  Co m p o n e n t s .   4. 7 ‐21   Im p a c t  HA Z ‐2  Th e  pr o p o s e d  Pr o j e c t  wo u l d  fa c i l i t a t e  ne w  de v e l o p m e n t ,  in c l u d i n g  re s i d e n t i a l ,  mi x e d ‐us e ,  an d  co m m e r c i a l  us e s ,  within Cupertino. Some of  th e  ne w  de v e l o p m e n t  co u l d  oc c u r  on  pr o p e r t i e s  th a t  po s s i b l y  ar e  co n t a m i n a t e d  an d  in a c t i v e ,  un d e r g o i n g  ev a l u a t i o n ,  and/or undergoing  co r r e c t i v e  ac t i o n ,  as  in d i c a t e d  in  Ta b l e  4. 7 . 1 4 . 7 ‐2.   Ch a p t e r  4. 9 :  La n d  Us e    an d  Pl a n n i n g  of  th e  Dr a f t  EI R 4. 9 ‐13   St u d y  Ar e a  4  St u d y  Ar e a  4 (M i r a p a t h )  is  wi t h i n  th e  Ho m e s t e a d  Sp e c i a l  Ar e a .  As  sh o w n  on  Fi g u r e  3‐14 3 ‐15 ,  th i s  St u d y  Ar e a  is  on one small parcel  13 8 2   No v e m b e r  3, 2014 | Page 14  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e (M i r a p a t h )   co m p r i s i n g  th e  Mi r a p a t h  of f i c e  bu i l d i n g  an d  su r f a c e  pa r k i n g  fr o n t i n g  No r t h  Bl a n e y  Av e n u e . 4. 9 ‐14   Ot h e r  Sp e c i a l    Ar e a s  in c l u d i n g   Ne i g h b o r h o o d s  an d   No n ‐Re s i d e n t i a l /   Mi x e d ‐Us e  Sp e c i a l   Ar e a s   Th e  Ge n e r a l  Pl a n  in c l u d e s  re s i d e n t i a l  an d  no n ‐re s i d e n t i a l  Sp e c i a l  Ce n t e r s  (s e e  Fi g u r e  3‐18 3 ‐4) . 4. 9 ‐20   Ho u s i n g  El e m e n t   Si t e  11  (V a l l c o   Sh o p p i n g  Di s t r i c t   ex c e p t  Ro s e b o w l )   Ho u s i n g  El e m e n t  Si t e  11  (V a l l c o  Sh o p p i n g  Di s t r i c t  ex c e p t  Ro s e b o w l )  en c o m p a s s e s  mo s t  of  St u d y  Ar e a  6 (V a l l c o  Shopping District), with the  ex c e p t i o n  of  th e  Ro s e B o w l  si t e  lo c a t e d  so u t h  of  Va l l c o  Pa r k w a y .  Th i s  Si t e  is  lo c a t e d  in  th e  He a r t  of  th e  Ci t y  Sp e c i a l  Area. The Site has three  is  ma d e  up  of  mu l t i p l e pa r c e l s  to t a l i n g  ap p r o x i m a t e l y  47 . 8 3  ac r e s ,  is  de s i g n a t e d  as  Co m m e r c i a l / O f f i c e / R e t a i l  Re s i d e n t i a l  (C/O/R) under the  cu r r e n t  Ge n e r a l  Pl a n ,  an d  is  zo n e d  Pl a n n e d  De v e l o p m e n t  wi t h  Re g i o n a l  Sh o p p i n g  (P ( R e g i o n a l  Sh o p p i n g ) ) Z o n i n g  designation. The maximum  de n s i t y  cu r r e n t l y  pe r m i t t e d  on  th e  Si t e  is  35  dw e l l i n g  un i t s  pe r  ac r e ,  wi t h  a ma x i m u m  he i g h t  of  60  fe e t  wi t h  re t a i l  uses on the ground level  (s e e  Fi g u r e  3‐31 ) .   4. 9 ‐21   Ho u s i n g  El e m e n t   Si t e  14  (M a r i n a   Pl a z a )   Ho u s i n g  El e m e n t  Si t e  14  (M a r i n a  Pl a z a )  is  lo c a t e d  in  th e  No r t h  Cr o s s r o a d s  No d e ,  wh i c h  is  wi t h i n  th e  He a r t  of  th e  City Special Area (see  Fi g u r e  3‐73 ‐8) .   4. 9 ‐23   Ho u s i n g  El e m e n t   Si t e  18  (T h e  Oa k s   Sh o p p i n g  Ce n t e r )   Ho u s i n g  El e m e n t  Si t e  18  (T h e  Oa k s  Sh o p p i n g  Ce n t e r )  is  lo c a t e d  in  th e  Oa k s  Ga t e w a y ,  wh i c h  is  pa r t  of  th e  He a r t  of the City Special Area (see  Fi g u r e  3‐73 ‐8) . Si t e  18  ha s  fo u r  pa r c e l s  to t a l i n g  ap p r o x i m a t e l y  7. 9  ac r e s ,  is  de s i g n a t e d  as  Co m m e r c i a l / O f f i c e / R e t a i l  Residential (C/O/R)  un d e r  th e  cu r r e n t  Ge n e r a l  Pl a n ,  an d  is  zo n e d  Pl a n n e d  De v e l o p m e n t  wi t h  Ge n e r a l  Co m m e r c i a l  an d  Pr o f e s s i o n a l  Office (P(CG, OP)). The  ma x i m u m  de n s i t y  cu r r e n t l y  pe r m i t t e d  on  th i s  Si t e  is  25  dw e l l i n g  un i t s  pe r  ac r e ,  wi t h  a ma x i m u m  he i g h t  of  45  fe e t  (see Figure 3‐38).  4. 9 ‐23   Ho u s i n g  El e m e n t   Si t e  19  (C y p r e s s   Bu i l d i n g   As s o c i a t i o n /   Ha l l  Pr o p e r t y )   Ho u s i n g  El e m e n t  Si t e  19  (C y p r e s s  Bu i l d i n g  As s o c i a t i o n / H a l l  Pr o p e r t y )  is  lo c a t e d  in  th e  Ea s t  St e v e n s  Cr e e k  Bo u l e v a r d  Node, which is part of  th e  He a r t  of  th e  Ci t y  Sp e c i a l  Ar e a  (s e e  Fi g u r e  3‐73 ‐8) .   13 8 3   No v e m b e r  3, 2014 | Page 15  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e Ch a p t e r  4. 1 0 :  No i s e  of  th e  Dr a f t  EI R   4. 1 0 ‐29   th r o u g h   4. 1 0 ‐30   St u d y  Ar e a s   St u d y  Ar e a s  ma y  be  lo o s e l y  gr o u p e d  in t o  tw o  no n ‐ex c l u s i v e  ca t e g o r i e s :  St u d y  Ar e a s  al o n g  or  ne a r  ma j o r  ar t e r i a l s  and study areas along or  ne a r  ma j o r  fr e e w a y s .  As  sh o w n  in  Fi g u r e  3‐23 ‐11 ,  St u d y  Ar e a s  7 (S t e v e n s  Cr e e k  Of f i c e  Ce n t e r )  an d  2 (C i t y  Ce n t e r )  fall into the first  ca t e g o r y ,  an d  wo u l d  ex p e r i e n c e  no i s e  en v i r o n m e n t s  do m i n a t e d  by  no i s e  al o n g  ma j o r  ar t e r i a l s .  St u d y  Ar e a s  1 (C u p e r t i n o  Inn and Goodyear  Ti r e ) ,  3 (P G & E ) ,  4 (M i r a p a t h )  an d  5 (C u p e r t i n o  Vi l l a g e )  ar e  in  th e  se c o n d  ca t e g o r y  wh e r e  no i s e  fr o m  ne a r b y  fr e e w a y s  is likely to dominate  th e  no i s e  en v i r o n m e n t .  St u d y  Ar e a  6 (V a l l c o  Sh o p p i n g  Di s t r i c t )  wo u l d  fa l l  in t o  bo t h  of  th e s e  ca t e g o r i e s ,  as  th e r e  are portions of the Study  Ar e a  th a t  ma y  be  mo r e  do m i n a t ed  by  fr e e w a y  no i s e  an d  po r t i o n s  th a t  ma y  be  mo r e  do m i n a t e d  by  no i s e  fr o m  major arterials.  Ch a p t e r  4. 1 1 :  Po p u l a t i o n  an d  Ho u s i n g  of  th e  Dr a f t  EI R 4. 1 1 ‐5  Ex i s t i n g  Co n d i t i o n s  ‐   Po p u l a t i o n   Th e  to t a l  po p u l a t i o n  of  Cu p e r t i n o  gr e w  fr o m  52 , 9 7 0  in  20 0 0  to  58 , 3 0 2 5 8 , 7 3 9  in  20 1 0 . 8, 9  Th i s  re p r e s e n t s  an  ap p r o x i m a t e  910 percent  in c r e a s e  fr o m  20 0 0  to  20 1 0 .  In  co n t r a s t ,  th e  co u n t y  gr e w  fr o m  1, 6 8 2 , 5 8 5  in  20 0 0  to  1, 7 8 1 , 6 4 2  in  20 1 0 ,  wh i c h  re p r e s e n t s  a slower rate of  gr o w t h  (5  pe r c e n t  co m p a r e d  to  91 0  pe r c e n t )  fo r  th e  co u n t y  as  a wh o l e  du r i n g  th e  sa m e  pe r i o d . 10 , 1 1  In  20 1 0 ,  Cu p e r t i n o  had a much smaller  po p u l a t i o n  th a n  th e  ne i g h b o r i n g  ci t i e s  of  Su n n y v a l e  (1 4 0 , 0 8 5 ) ,  Sa n t a  Cl a r a  (1 1 6 , 4 6 8 )  an d  Sa n  Jo s e  (9 8 5 , 6 9 1 ) .   8 As s o c i a t i o n  of  Ba y  Ar e a  Go v e r n m e n t s ,  Pr o j e c t i o n s   2 0 0 9 , Cu p e r t i n o  Su b r e g i o n a l  St u d y  Ar e a  Ta b l e ,  Sa n t a  Cl a r a  County.  9 As s o c i a t i o n  of  Ba y  Ar e a  Go v e r n m e n t s ,  Pl a n   B a y   A r e a ,   P r o j e c t i o n s   2 0 1 3 ,   Su b r e g i o n a l  St u d y  Ar e a  Ta b l e ,  Sa n t a  Cl a r a  County.  10 As s o c i a t i o n  of  Ba y  Ar e a  Go v e r n m e n t s ,  Pr o j e c t i o n s   2 0 0 9 , Cu p e r t i n o  Su b r e g i o n a l  St u d y  Ar e a  Ta b l e ,  Sa n t a  Cl a r a  County.  11  As s o c i a t i o n  of  Ba y  Ar e a  Go v e r n m e n t s ,  Pl a n   B a y   A r e a ,   P r o j e c t i o n s   2 0 1 3 ,   Su b r e g i o n a l  St u d y  Ar e a  Ta b l e ,  Sa n t a  Cl a r a  County  4. 1 1 ‐6  Ex i s t i n g  Co n d i t i o n s  –  Fu t u r e  Ho u s i n g   Ne e d s   Ta b l e  4. 1 1 ‐1 in c l u d e s  th e  AB A G ’ s  20 1 3  Pr o j e c t i o n s  fo r  th e  Ci t y  of  Cu p e r t i n o  an d  Sa n t a  Cl a r a  Co u n t y .  Th e  pr o j e c t i o n s  estimate that by 2040  th e  po p u l a t i o n  in  Cu p e r t i n o  is  ex p e c t e d  to  gr o w  to  71 , 7 0 0  pe o p l e  an d  th e  nu m b e r  of  ho u s e h o l d s  wo u l d  gr o w  to  24,180, an increase of  ap p r o x i m a t e l y  22  pe r c e n t  an d  19  pe r c e n t  fr o m  201 0 ,  re s p e c t i v e l y .  Th e s e  ra t e s  ar e  lo w e r  th a n  th e  AB A G ’ s  pr o j e c t e d  population and  ho u s e h o l d  gr o w t h  of  ap p r o x i m a t e l y  36  an d  35  pe r c e n t ,  re s p e c t i v e l y ,  fo r  Sa n t a  Cl a r a  Co u n t y  as  a wh o l e  du r i n g  th e  same period.    4. 1 1 ‐13   Im p a c t  PO P ‐1 –  Re g i o n a l  Pl a n n i n g   As  sh o w n  in  Ta b l e  4. 1 1 ‐3,  im p l e m e n t a t i o n  of  th e  pr o p o s e d  Pr o j e c t  wo u l d  re s u l t  in  a to t a l  of  4, 4 2 1  ne w  ho u s e h o l d s  in the city for a total of  25 , 8 2 0  ho u s e h o l d s  fo r  th e  bu i l d o u t  ho r i z o n  ye a r  20 4 0 .  As s u m i n g  th e  ne w  dw e l l i n g  un i t s  pe r m i t t e d  un d e r  th e  pr o p o s e d  Project would have  th e  av e r a g e  2. 9 4  pe r s o n s  pe r  ho u seh o l d  si z e  as  ap p l i e d  in  AB A G  Pr o j e c t i o n s  20 1 3 ,  po p u l a t i o n  in  th e  ci t y  co u l d  in c r e a s e  by 12,998 residents  fo r  a to t a l  of  71 , 3 0 0  re s i d e n t s  by  20 4 0 .  By  co m p a r i s o n ,  as  sh o w n  in  Ta b l e  4. 1 1 ‐1 4. 1 1 ‐2,  AB A G  an t i c i p a t e s  3, 8 6 1  new households and  13 8 4   No v e m b e r  3, 2014 | Page 16  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 12 , 9 6 1  ne w  re s i d e n t s  in  Cu p e r t i n o ,  fo r  a to t a l  of  24 , 1 8 0  ho u s e h o l d s  an d  71 , 7 0 0  re s i d e n t s  by  20 4 0 .    Wh i l e  th e  pr o p o s e d  Project would  re s u l t  in  40 0  fe w e r  re s i d e n t s  an d  1,  64 0  mo r e  un i t s ,  th e  ra t e  of  gr o w t h  un d e r  th e  pr o p o s e d  Pr o j e c t  an d  es t i m a t e d  by ABAG would be the  sa m e  fo r  po p u l a t i o n  gr o w t h  (i . e .  22  pe r c e n t )  an d  in c r e a s e  by  2 pe r c e n t  (2 1  co m p a r ed  to  19  pe r c e n t )  fo r  ho u s e h o l d  growth. Consequently,  th e  ad d i t i o n a l  ho u s i n g  un i t s  re s u l t i n g  fr o m  im p l e m e n t a t i o n  of  th e  pr o p o s e d  Pr o j e c t  wo u l d  no t  su b s t a n t i a l l y  ex c e e d  regional projections.    4. 1 1 ‐13   Im p a c t  PO P ‐1 –  Re g i o n a l  Pl a n n i n g   Wi t h  re s p e c t  to  jo b s ,  AB A G  pr o j e c t s  an  in c r e a s e  of  7, 0 4 0  jo b s  fo r  a to t a l  of  33 , 3 6 0  jo b s  in  20 4 0 ,  as  sh o w n  in  Ta b l e  4.11‐1. As shown in  Ta b l e  4. 1 1 ‐3 4. 1 1 ‐4,  wh e n  ap p l y i n g  th e  Ci t y ’ s  jo b  ge n e r a t i o n  ra t e s  fo r  of f i c e ,  co m m e r c i a l  an d  ho t e l  de v e l o p m e n t ,  buildout of the proposed  Pr o j e c t  co u l d  re s u l t  in  as  ma n y  as  16 , 8 5 5  ad d i t i o n a l  jo b s  fo r  a to t a l  of  44 , 2 4 2  jo b s  in  20 4 0 ,  wh i c h  wo u l d  ex c e e d  the regional job projections  by  10 , 9 8 2  jo b s ,  wh i c h  re p r e s e n t s  a 35  pe r c e n t  ra t e  in c r e a s e  (6 2  co m p a r e d  to  27  pe r c e n t ) .   4. 1 1 ‐17   Im p a c t  PO P ‐3  As  de s c r i b e d  un d e r  Im p a c t  PO P ‐2 ab o v e ,  po t e n t i a l  fu t u r e  de v e l o p m e n t  at  po t e n t i a l  Ho u s i n g  El e m e n t s  Si t e  5 (G l e n b r o o k  Apartments), and  Si t e  6 (T h e  Vi l l a g e s  Ap a r t m e n t s ) ,  wo u l d  be  in f i l l  an d  no  re m o v a l  of  ex i s t i n g  ho u s i n g  wo u l d  oc c u r ;  ho w e v e r ,  Ho u s i n g  Site 10 (The Hamptons)  co u l d  in v o l v e  th e  de m o l i t i o n  an d  re p l a c e m e n t  of  ex i s t i n g  ho u s i n g  un i t s ,  wh i c h  co u l d  re s u l t  in  th e  te m p o r a r y  di s p l a c e m e n t  of some  re s i d e n t s ,  bu t  th i s  wo u l d  no t  re s u l t  in  di s p l a c e m e n t  of  su b s t a n t i a l  nu m b e r s  of  pe o p l e  an d  ho u s i n g  ne c e s s i t a t i n g  more replacement  ho u s i n g  th a n  is  al r e a d y  pl a n n e d .  Fo r  th e  re m a i n d e r  of  th e  Ho u s i n g  El e m e n t  Si t e s  1 th r o u g h  9 4,  7 th r o u g h  9,  an d  11 through 19 listed in  Ch a p t e r  3,  Pr o j e c t  De s c r i p t i o n ,  of  th i s  Dr a f t  EI R ,  no  di s p l a c e m e n t  wo u l d  oc c u r  be c a u s e  th e  in c r e a s e  in  ho u s i n g  would be accomplished by  co n s t r u c t i n g  in f i l l  un i t s  on  po r t i o n s  of  th e  Ho u s i n g  El e m e n t  Si t e s  th a t  ar e  no t  cu r r e n t l y  de v e l o p e d  wi t h  ho u s i n g .  For Housing Element Sites  10 ,  re d e v e l o p m e n t  of  th e  si t e  at  it s  pr o p o s e d  ma x i m u m  ca p a c i t y  wo u ld re q u i r e  de m o l i s h i n g  ex i s t i n g  un i t s  an d  would require the  oc c u p a n t s  to  mo v e  wh i l e  th e  ne w  re s i d e n t i a l  pr o j e c t  is  un d e r  co n s t r u c t i o n ;  ho w e v e r ,  th e r e  wo u l d  be  a ne t  in c r e a s e  in the number of  ho u s i n g  un i t s  in  Cu p e r t i n o  (4 ,  42 1  un i t s  co m p a r e d  to  1, 8 9 5  un i t s ) .  Ad d i t i o n a l l y ,  ba s e d  on  an  av e r a g e  ho u s e h o l d  size of 2.94 persons per  ho u s e h o l d ,  th e  pr o p o s e d  ne t  in c r e a s e  of  82 0  ho u s i n g  un i t s  fr o m  re d e v e l o p m e n t  on  th e s e  Ho u s i n g  El e m e n t  Si t e  10 would accommodate  ap p r o x i m a t e l y  2, 4 1 1  ne w  re s i d e n t s  in  th e  ci t y .    Ch a p t e r  4. 1 2 :  Pu b l i c  Se r v i c e s  an d  Re c r e a t i o n  of  th e  Dr a f t  EI R Th e  Dr a f t  EI R  co n s e r v a t i v e l y  es t i m a t e d  th a t  th e  to t a l  of  4, 4 2 1  ho u s i n g  un i t s  un d e r  th e  pr o p o s e d  Pr o j e c t  co u l d  be  as s i g n e d  to  th e  St u d y  Ar e a  as  a wh o l e .   The following revisions  pr o v i d e  a br e a k ‐do w n  of  th e  to t a l  ho u s i n g  un i t s  by  sc h o o l  di s t r i c t  to  mo r e  pr e c i s e l y  il l u s t r a t e  th e  po t e n t i a l  st u d e n t  ge n e r a t i o n  by  di s t r i c t .            13 8 5   No v e m b e r  3, 2014 | Page 17  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 4. 1 2 ‐13   Sc h o o l s   Th i s  se c t i o n  de s c r i b e s  th e  ex i s t i n g  co n d i t i o n s  re g a r d  to  sc h o o l s  se r v i n g  Cu p e r t i n o ,  ba s e d  on  th e  Sc h o o l  En r o l l m e n t  and Fiscal Impact  An a l y s i s  pr e p a r e d  by  Sc h o o l h o u s e  Se r v i c e s 2 in  Ap p e n d i x  F,  Pu b l i c  Se r v i c e s ,  of  th i s  Dr a f t  EI R .   4. 1 2 ‐15   Cu p e r t i n o  Un i o n   Sc h o o l  Di s t r i c t   As  sh o w n  in  Ta b l e  4. 1 2 ‐3,  th e  CU S D  sc h o o l s  ar e  al r e a d y  we l l  ov e r  th e i r  ca p a c i t i e s ,  ex c e p t  fo r  th e  Ea t o n  El e m e n t a r y  School, which is also  ne a r  it s  ca p a c i t y .  Wi t h  th e  pr o p o s e d  Pr o j e c t ,  th e  CU S D  wo u l d  ex p e r i e n c e  an  ad d i t i o n a l  in c r e a s e  in  th e i r  at t e n d a n c e  of 1,10590124 students  in  el e m e n t a r y  sc h o o l s  an d  30 9 2 5 3 25  st u d e n t s  in  mi d d l e  sc h o o l s .  Th e  pr o j e c t i o n ,  as  we l l  as  th e  cu r r e n t  en r o l l m e n t ,  indicates that the CUSD  wo u l d  no t  ha v e  su f f i c i e n t  ca p a c i t y  to  ac c o m m o d a t e  th e  ex p e c t e d  in c r e a s e  in  en r o l l m e n t  by  20 4 0 .   24  Th e  in c r e a s e d  in  th e  CU S D  el e m e n t a r y  sc h o o l  is  ca l c u l a t e d  wi t h  th e  st u d e n t  ge n e r a t i o n  ra t e  of  0. 2 5  fr o m  th e  school report, and the  ad d i t i o n a l  ho u s i n g  un i t s  ex p e c t e d  at  20 4 0  bu i l d o u t ,  4, 4 2 1  3, 6 0 1  un i t s  (4 , 4 2 1  to t a l  un i t s  – 82 0  un i t s  in  th e  SC U S D  = 3,601 units).  25  Th e  in c r e a s e d  in  th e  CU S D  el e m e n t a r y  mi d d l e  sc h o o l  is  ca l c u l a t e d  wi t h  th e  st u d e n t  ge n e r a t i o n  ra t e  of  0. 0 7  fr o m  the school report, and  th e  ad d i t i o n a l  ho u s i n g  un i t s  ex p e c t e d  at  20 4 0  bu i l d o u t ,  4, 4 2 1  3, 6 0 1  un i t s  (4 , 4 2 1  to t a l  un i t s  – 82 0  un i t s  in  th e  SC U S D  = 3,601 units).  4. 1 2 ‐16   Fr e m o n t  Un i f i e d   Hi g h  Sc h o o l  Di s t r i c t   As  sh o w n  in  th e  Ta b l e  4. 1 2 ‐4,  FU H S D  sc h o o l s  ar e  wi t h i n  5 pe r c e n t  of  th e  ca p a c i t y  es t a b l i s h e d  ba s e d  on  th e  FU H S D ’ s  standards. For the  di s t r i c t  as  a wh o l e ,  th e  cu r r e n t  en r o l l m e n t  is  al m o s t  ex a c t l y  eq u a l  to  ca p a c i t y .  Al m o s t  al l  of  th e  fi v e  hi g h  sc h o o l s  show a capacity deficit  wi t h  Cu p e r t i n o  Hi g h  Sc h o o l  wi t h  th e  la r g e s t  de f i c i t ,  an d  Mo n t a  Vi s t a  Hi g h  Sc h o o l  wi t h  a sl i g h t  su r p l u s  in  ca p a c i t y .  With the proposed  Pr o j e c t ,  th e  FU H S D  wo u l d  ex p e r i e n c e  an  ad d i t i o n a l  in c r e a s e  in  th e i r  at t e n d a n c e  by  30 9 2 5 3 29  st u d e n t s  by  20 4 0 .  The increased student  en r o l l m e n t ,  an d  th e  ca p a c i t y  de f i c i t  fo r  th e  FU H S D  wo u l d  in c r e a s e  an d  sc h o o l s  wi l l  be  ov e r c r o w d e d .   29  Th e  in c r e a s e d  in  th e  CF U H S D  el e m e n t a r y  hi g h  sc h o o l  is  ca l c u l a t e d  wi t h  th e  st u d e n t  ge n e r a t i o n  ra t e  of  0. 0 7  fr o m  the school report, and  th e  ad d i t i o n a l  ho u s i n g  un i t s  ex p e c t e d  at  20 4 0  bu i l d o u t ,  4, 4 2 1  3, 6 0 1  un i t s  (4 , 4 2 1  to t a l  un i t s  – 82 0  un i t s  in  th e  SC U S D  = 3,601 units).                                                                                                                           2 No t e  th a t  th i s  re p o r t  ha s  be e n  re v i s e d  to  in c l u d e  mi n o r  re v i s i o n s  th a t  do  no t  af f e c t  th e  an a l y s i s .    Th e  re v i s i o n s  ar e  sh o w n  in this table  un d e r  th e  he a d i n g  “A p p e n d i x  F”  be l o w .   13 8 6   No v e m b e r  3, 2014 | Page 18  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 4. 1 2 ‐18   Sa n t a  Cl a r a  Un i f i e d   Sc h o o l  Di s t r i c t   Th e  SC U S D  ha s  be e n  gr o w i n g  ov e r  th e  pa s t  de c a d e ,  wi t h  en r o l l m e n t  in c r e a s i n g  fr o m  13 , 9 7 6  in  20 0 3  to  15 , 3 9 4  in  2013. For the next  de c a d e ,  10 , 5 0 0  ne w  un i t s  ar e  es t i m a t e d  to  be  ad d e d  in  th e  SC U S D ,  of  wh i c h  90  pe r c e n t  of  th e m  wo u l d  be  ap a r t m e n t s .  Since high density  ap a r t m e n t s  ge n e r a t e  ve r y  fe w  st u d e n t s ,  th e  st u d e n t  ge n e r a t i o n  ra t e  av e r a g e s  on l y  ab o u t  0. 0 2 3  st u d e n t s  pe r  un i t  based on, 0.034 for  el e m e n t a r y  sc h o o l s  an d  0. 0 1 2  fo r  mi d d l e  an d  hi g h  sc h o o l s .  Th e  in c r e a s e  in  th e  SC U S D  is  ca l c u l a t e d  us i n g  th e  st u d e n t  generation rates from  th e  sc h o o l  re p o r t ,  an d  th e  ad d i t i o n a l  ho u s i n g  un i t s  ex p e c t e d  at  20 4 0  bu i l d o u t ,  82 0  un i t s  (4 , 4 2 1  to t a l  un i t s  – 3, 6 0 1 u n i t s  in the CUSD and  FU H S D  = 82 0  un i t s ) .   4. 1 2 ‐18   Im p a c t  Di s c u s s i o n   Th i s  se c t i o n  an a l y z e s  th e  pr o p o s e d  Pr o j e c t ’ s  po t e n t i a l  im p a c t s  an d  cu m u l a t i v e  im p a c t s  to  sc h o o l  se r v i c e s ,  ba s e d  on the School Enrollment  an d  Fi s c a l  Im p a c t  An a l y s i s  pr e p a r e d  by  Sc h o o l h o u s e  Se r v i c e s 3 in  Ap p e n d i x  F,  Pu b l i c  Se r v i c e s ,  of  th i s  Dr a f t  EI R .   4. 1 2 ‐19   Im p a c t  PS ‐5 –  Cu p e r t i n o  Un i o n   Sc h o o l  Di s t r i c t   Th e  pr o p o s e d  Pr o j e c t  wo u l d  ge n e r a t e  ap p r o x i m a t e l y  4, 4 2 1  ho u s i n g  un i t s  in  Cu p e r t i n o .  As  de s c r i b e d  ab o v e ,  af t e r  subtracting the 820 units  ex p e c t e d  to  be  lo c a t e d  in  th e  SC U S D ,  th e  CU S D  wo u l d  ex p e r i e n c e  an  ad d i t i o n a l  1, 1 0 5 9 0 1  st u d e n t s  in  el e m e n t a r y  schools and 309253  st u d e n t s  in  mi d d l e  sc h o o l .  Wi t h  st u d e n t  en r o l l m e n t  al r e a d y  ex c e e d i n g  CU S D ’ s  ca p a c i t y ,  th e  ad d i t i o n a l  st u d e n t s  would exacerbate the  CU S D ’ s  ca p a c i t y .  In  or d e r  to  ac c o m m o d a t e  ne w  st u d e n t s ,  th e  CU S D  ne e d s  to  ei t h e r  ex p a n d  ex i s t i n g  fa c i l i t i e s  or  construct new schools.  Ho w e v e r ,  Cu p e r t i n o  do e s  no t  ha v e  su f f i c i e n t  lo c a t i o n s  fo r  ne w  sc h o o l  fa c i l i t i e s  to  ac c o m m o d a t e  th e  in c r e a s e d  enrollment expected.  Th e r e f o r e ,  mo s t  of  th e  im p r o v e m e n t s  ar e  ex p e c t e d  to  oc c u r  on  ex i s t i n g  si t e s  wi t h  tw o ‐st o r y  cl a s s r o o m  bu i l d i n g s .   Since these are  es t a b l i s h e d  sc h o o l  si t e s  cu r r e n t l y  in  op e r a t i o n ,  en v i r o n m e n t a l  im p a ct s  du e  to  co n s t r u c t i o n  of  th e  fa c i l i t i e s  ar e  ex p e c t e d  to be minimal. The  CU S D  wo u l d  re c e i v e  ap p r o x i m a t e l y  $9 . 1  7. 4  mi l l i o n  in  de v e l o p m e n t  im p a c t  fe e s  fr o m  th e  pr o p o s e d  Pr o j e c t ,  wh i c h  would mitigate the  im p a c t s  fr o m  th e  pr o p o s e d  Pr o j e c t  pe r  SB  50 .  Th e  im p a c t  to  th e  CU S D  wo u l d  be  le s s   t h a n   s i g n i f i c a n t .                                                                                                                           3 No t e  th a t  th i s  re p o r t  ha s  be e n  re v i s e d  to  in c l u d e  mi n o r  re v i s i o n s  th a t  do  no t  af f e c t  th e  an a l y s i s .    Th e  re v i s i o n s  ar e  sh o w n  in this table  un d e r  th e  he a d i n g  “A p p e n d i x  F”  be l o w .   13 8 7   No v e m b e r  3, 2014 | Page 19  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 4. 1 2 ‐19   Im p a c t  PS ‐5 –  Fr e m o n t  Un i f i e d   Hi g h  Sc h o o l  Di s t r i c t   Wi t h  th e  es t i m a t e d  in c r e a s e  of  4, 4 2 1  ne w  ho u s i n g  un i t s  to  Cu p e r t i n o ,  of  wh i c h  3, 6 0 1  un i t s  wo u l d  be  in  th e  FU H S D ,  the FUHSD would  ex p e r i e n c e  an  in c r e a s e  of  30 9 2 5 3  st u d e n t s  by  20 4 0 .  Al t h o u g h  cu r r e n t  st u d e n t  en r o l l m e n t  al m o s t  eq u a l s  to  it s  ca p a c i t y ,  an additional  30 9 2 5 3  st u d e n t s  wo u l d  in c r e a s e  th e  ca p a c i t y  de f i c i t  fo r  th e  FU H S D .  Ho w e v e r ,  th e  FU H S D  ha s  be e n  mo d e r n i z i n g  its facilities with additional  cl a s s r o o m  an d  ca f e t e r i a s  to  co n t i n u o u s l y  ad d r e s s  th e  ca p a c i t y  de f i c i t  is s u e ,  an d  ad d i t i o n a l  de v e l o p m e n t  im p a c t  fee of $64.9 million would  am e l i o r a t e  th e  ca p a c i t y  pr o b l e m .  Th e r e f o r e ,  mo s t  of  th e  im p r o v e m e n t s  ar e  ex p e c t e d  to  oc c u r  on  ex i s t i n g  si t e s  with two‐story classroom  bu i l d i n g s .  Si n c e  th e s e  ar e  es t a b l i s h e d  sc h o o l  si t e s  cu r r e n t l y  in  op e r a t i o n ,  en v i r o n m e n t a l  im p a c t s  du e  to  co n s t r u c t i o n  of the facilities are  ex p e c t e d  to  be  mi n i m a l .  Th e  im p a c t  to  th e  FU H S D  wo u l d  be  le s s   t h a n   s i g n i f i c a n t .   4. 1 2 ‐19   Im p a c t  PS ‐5 –   Sa n t a  Cl a r a  Un i f i e d   Sc h o o l  Di s t r i c t   Wi t h  Of  th e  4, 4 2 1  ne w  ho u s i n g  un i t s  wi t h  pr o v i d e d  fo r  in  th e  pr o p o s e d  Pr o j e c t ,  82 0  ne w  ho u s i n g  un i t s  wi l l  be  lo c a t e d  in  the SCUSD. With  th e  an t i c i p a t e d  82 0  ho u s i n g  un i t s ,  th e  ex p e c t e d  gr o w t h  in  st u d e n t  en r o l l m e n t  fo r  th e  SC U S D  wo u l d  be  ap p r o x i m a t e l y  22056 students  (1 3 2 2 8  fo r  el e m e n t a r y  sc h o o l s ,  an d  44  14  st u d e n t s  fo r  mi d d l e  sc h o o l s  an d  14  fo r  hi g h  sc h o o l s ) .  Al t h o u g h  in c r e a s e d  enrollment would add  st r e s s  to  th e  sc h o o l  in  th e  SC U S D ,  de v e l o p m e n t  im p a c t  fe e s  fo r  th e  pr o p o s e d  Pr o j e c t  wo u l d  mi t i g a t e  th e  im p a c t  to the SCUSD facilities;  th e r e f o r e ,  th e  im p a c t s  to  th e  SC U S D  wo u l d  be  le s s   t h a n   s i g n i f i c a n t .     13 8 8   No v e m b e r  3, 2014 | Page 20  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e Ch a p t e r  4. 1 3 :  Tr a n s p o r t a t i o n  an d  Tr a f f i c  of  th e  Dr a f t  EI R 4. 1 3 ‐25   Ex i s t i n g  Tr a n s i t   Se r v i c e   TAB L E  4. 1 3 ‐5  VT A  ROU T E S  AN D  PEA K  PER I O D  HEA D W A Y S  IN  CUP E R T I N O   Bu s  Ro u t e   Ap p r o x i m a t e  Pe a k    Pe r i o d  He a d w a y s    (m i n . )   Ro u t e  De s c r i p t i o n   23   10  to  12   De  An z a  Co l l e g e  to  Al u m  Ro c k  Tr a n s i t  Ce n t e r  vi a  St e v e n s  Creek  25   10 2 0  to  30   De  An z a  Co l l e g e  to  Al u m  Ro c k  Tr a n s i t  Ce n t e r  vi a  Va l l e y  Me d i c a l  Center 26   15 / 3 0 Su n n y v a l e / L o c k h e e d  Ma r t i n  Tr a n s i t  ce n t e r  to  Ea s t r i d g e  Tr a n s i t  Center 51   60 De  An z a  Co l l e g e  to  Mo f f e t t  Fi e l d / A m e s  Ce n t e r 53   60 We s t  Va l l e y  Co l l e g e  to  Su n n y v a l e  Tr a n s i t  Ce n t e r 54   30 De  An z a  Co l l e g e  to  Su n n y v a l e / L o c k h e e d  Ma r t i n  Tr a n s i t  Ce n t e r 55   15 3 0 De  An z a  Co l l e g e  to  Gr e a t  Am e r i c a 81   30   We e k d a y   Va l l c o   to   Sa n   Jo s e   St a t e   Un i v e r s i t y   Sa t / S u n   Va l l c o  to Santa Clara  Tr a n s i t  Ce n t e r   10 1   2 ru n s  in  pe a k a Ca m d e n  an d St a t e  Ro u t e 85  to  Pa l o  Al t o 18 2   1 ru n  in  pe a k a Pa l o  Al t o  to  IB M / B a i l e y  Av e n u e 32 3   15 Do w n t o w n  Sa n  Jo s e  to  De  An z a  Co l l e g e 32 8   2 ru n s  in  pe a k a Al m a d e n  Ex p r e s s w a y  to  Lo c k h e e d  Ma r t i n / M o f f e t t  In d u s t r i a l  Park a.  Nu m b e r  of  ru n s  pr o v i d e d  in  bo t h  AM  an d  PM  pe a k  pe r i o d s .  Se r v i c e  is  pr o v i d e d  in  pe a k  co m m u t e  di r e c t i o n  on l y .    13 8 9   No v e m b e r  3, 2014 | Page 21  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e So u r c e :  He x a g o n  Tr a n s p o r t a t i o n  Co n s u l t a n t s ,  20 1 3 .   4. 1 3 ‐44   20 4 0  No  Pr o j e c t   In t e r s e c t i o n  Le v e l s   of  Se r v i c e 4  Ta b l e  4. 1 3 ‐12   20 4 0  No  Pr o j e c t  AM  an d  PM  Pe a k  Ho u r  Le v e l  of  Se r v i c e  Re s u l t s   St u d y   In t e r s e c t i o n   In t e r s e c t i o n   LO S   St a n d a r d   Pe a k   Ho u r   Av e r a g e   De l a y  No Project LOS  12   De  An z a  Bo u l e v a r d  an d  SR  85  SB  Ra m p a  D  AM   23 . 9   C  PM   22 . 2   B‐C+    4. 1 3 ‐50   Im p a c t  TR A F ‐1 –  In t e r s e c t i o n  Le v e l s   of  Se r v i c e   Fi v e    Si x  (5 6 )  of  th e  si x t e e n  (1 6 )  in t e r s e c t i o n s  th a t  wo u l d  op e r a t e  at  an  un a c c e p t a b l e  le v e l  of  se r v i c e  fo r  at  le a s t  one peak hour under the  pr o p o s e d  Pr o j e c t  we r e  al s o  pr e d i c t e d  to  op e r a t e  at  an  un a c c e p t a b l e  le v e l  of  se r v i c e  un d e r  th e  No  Pr o j e c t  sc e n a r i o .                                                                                                                             4 Ta b l e  4. 1 3 ‐12  li s t s  41  to t a l  in t e r s e c t i o n s ;  ho w e v e r ,  on l y  th e  No  Pr o j e c t  LO S  fo r  th e  PM  Pe a k  Ho u r  fo r  In t e r s e c t i o n  #1 2  wa s  re v i s e d .   13 9 0   No v e m b e r  3, 2014 | Page 22  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 4. 1 3 ‐52   th r o u g h   4. 1 3 ‐53   Im p a c t  TR A F ‐1 –  In t e r s e c t i o n  Le v e l s   of  Se r v i c e   As  sh o w n  in  Ta b l e  4. 1 3 ‐13 ,  ab o v e ,  th e  pr o p o s e d  Pr o j e c t  wo u l d  re s u l t  in  si g n i f i c a n t  im p a c t s  to  se v e n t e e n  (1 7 )  si x t e e n  (16) intersections  du r i n g  at  le a s t  on e  of  th e  pe a k  ho u r s .     SR  85  No r t h b o u n d  Ra m p s  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 2 ) :  LO S  E – AM  Pe a k  Ho u r    St e l l i n g  Ro a d  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 3 ) :  LO S  F – PM  Pe a k  Ho u r    Su n n y v a l e ‐Sa r a t o g a  Ro a d / D e  An z a  Bo u l e v a r d  an d  Ho m e s t e a d  Ro a d  (# 5 ) :  LO S  F – AM  an d  PM  Pe a k  Ho u r s    De  An z a  Bo u l e v a r d  an d  I‐28 0  No r t h b o u n d  Ra m p  (# 6 ) :  LO S  F – AM  an d  PM  Pe a k  Ho u r s    De  An z a  Bo u l e v a r d  an d  I‐28 0  So u t h b o u n d  Ra m p  (# 7 ) :  LO S  F – AM  an d  PM  Pe a k  Ho u r s    De  An z a  Bo u l e v a r d  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 8 ) :  LO S  F – PM  Pe a k  Ho u r    De  An z a  Bo u l e v a r d  an d  Mc C l e l l a n  Ro a d / P a c i f i c a  Dr i v e  (# 9 ) :  LO S  F – PM  Pe a k  Ho u r    Wo l f e  Ro a d  an d  Ho m e s t e a d  Ro a d  (# 1 6 ) :  LO S  F – PM  Pe a k  Ho u r    Wo l f e  Ro a d  an d  I‐28 0  No r t h b o u n d  Ra m p  (# 1 8 ) :  LO S  F an d  E – AM  an d  PM  Pe a k  Ho u r s ,  re s p e c t i v e l y    Wo l f e  Ro a d  an d  I‐28 0  So u t h b o u n d  Ra m p  (# 1 9 ) :  LO S  F – AM  an d  PM  Pe a k  Ho u r s    St e v e n s  Cr e e k  Bo u l e v a r d  an d  Wo l f e  Ro a d / M i l l e r  Av e n u e  (# 2 1 ) :  LO S  E+  AM  Pe a k  Ho u r    No r t h  Ta n t a u  Av e n u e / Q u a i l  Av e n u e  an d  Ho m e s t e a d  Ro a d  (# 2 4 ) :  LO S  E – AM  Pe a k  Ho u r  an d  E+  – PM  Pe a k  Hour   St e v e n s  Cr e e k  Bo u l e v a r d  an d  Ta n t a u  Av e n u e  (# 2 7 ) :  LO S  E+  an d  F – AM  an d  PM  Pe a k  Ho u r s ,  re s p e c t i v e l y    St e v e n s  Cr e e k  Bo u l e v a r d  an d  I‐28 0  SB  Ra m p s / C a l v e r t  Dr i v e  (# 2 9 ) :  LO S  F – PM  Pe a k  Ho u r    Ag i l e n t  Te c h  Dr i v e  Wa y  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 3 0 ) :  LO S  F ‐   AM  Pe a k  Ho u r     La w r e n c e  Ex p r e s s w a y  So u t h b o u n d  Ra m p  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 3 1 ) :  LO S  F – AM  Pe a k  Ho u r    St e v e n s  Cr e e k  Bo u l e v a r d  an d  La w r e n c e  Ex p r e s s w a y  No r t h b o u n d  Ra m p  (# 3 2 ) :  LO S  F – AM  Pe a k  Ho u r   4. 1 3 ‐55   th r o u g h   4. 1 3 ‐56   Mi t i g a t i o n  Me a s u r e   TR A F ‐1  Wh i l e  im p l e m e n t a t i o n  of  Mi t i g a t i o n  Me a s u r e  TR A F ‐1 wo u l d  se c u r e  a fu n d i n g  me c h a n i s m  fo r  fu t u r e  ro a d w a y  an d  infrastructure  im p r o v e m e n t s  th a t  ar e  ne c e s s a r y  to  mi t i g a t e  im p a c t s  fr o m  fu t u r e  pr o j e c t s  ba s e d  on  th e n  cu r r e n t  st a n d a r d s ,  im p a c t s  would remain  si g n i f i c a n t   a n d   u n a v o i d a b l e , be c a u s e  th e  Ci t y  ca n n o t  gu a r a n t e e  im p r o v e m e n t s  at  th e s e  in t e r s e c t i o n s  at  th i s  ti m e .  This is in part because  th e  ne x u s  st u d y  ha s  ye t  to  be  pr e p a r e d  an d  be c a u s e  so m e  of  th e  im p a c t e d  in t e r s e c t i o n s  ar e  un d e r  th e  ju r i s d i c t i o n s  of the Cities of  Su n n y v a l e  an d  Sa n t a  Cl a r a  an d  Ca l t r a n s .  Sp e c i f i c a l l y ,  th e  fo l l o w i n g  in t e r s e c t i o n s  ar e  ou t s i d e  th e  ju r i s d i c t i o n  of  Cu p e r t i n o :     SR  85  No r t h b o u n d  Ra m p s  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (C a l T r a n s )  (# 2 )    De  An z a  Bo u l e v a r d  an d  I‐28 0  No r t h b o u n d  Ra m p  (C a l T r a n s )  (# 6 )   13 9 1   No v e m b e r  3, 2014 | Page 23  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e  Wo l f e  Ro a d  an d  Ho m e s t e a d  Ro a d  (S u n n y v a l e / C u p e r t i n o )  (# 1 6 )    Wo l f e  Ro a d  an d  I‐28 0  No r t h b o u n d  Ra m p  (C a l T r a n s )  (# 1 8 )    Wo l f e  Ro a d  an d  I‐28 0  So u t h b o u n d  Ra m p  (C a l T r a n s )  (# 1 9 )    No r t h  Ta n t a u  Av e n u e / Q u a i l  Av e n u e  an d  Ho m e s t e a d  Ro a d  (S u n n y v a l e / C u p e r t i n o )  (# 2 4 )    St e v e n s  Cr e e k  Bo u l e v a r d  an d  Ag i l e n t  Te c h n o l o g i e s  Dr i v e w a y  (S a n t a  Cl a r a )  (# 3 0 )    La w r e n c e  Ex p r e s s w a y  So u t h b o u n d  Ra m p  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (C M P ,  Co u n t y ) ( # 3 1 )    La w r e n c e  Ex p r e s s w a y  No r t h b o u n d  Ra m p  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (C M P ,  Co u n t y )  (# 3 2 )   4. 1 3 ‐63   Im p a c t  TR A F ‐2 –  CM P  Im p a c t s   Of  th e  41  st u d y  in t e r s e c t i o n s  in c l u d e d  in  th i s  an a l y s i s ,  21  ar e  in c l u d e d  in  Sa n t a  Cl a r a  Co u n t y ’ s  Co n g e s t i o n  Ma n a g e m e n t  Program (CMP).  Im p a c t  TR A F ‐1,  wh i c h  pr e s e n t s  th e  re s u l t s  of  th e  im p a c t  an a l y s i s  un d e r  20 4 0  No  Pr o j e c t  Co n d i t i o n s  an d  th e  pr o p o s e d  Project on all of the  st u d y  in t e r s e c t i o n s,  in c l u d e s  th e  21  CM P  in t e r s e c t i o n s .  Th e  pr o p o s e d  Pr o j e c t  wo u l d  re s u l t  in  si g n i f i c a n t  im p a c t s  to the following twelve  (1 2 )  el e v e n  (1 1 )  CM P  in t e r s e c t i o n s  at  le a s t  on e  of  th e  pe a k  ho u r s :    SR  85  No r t h b o u n d  Ra m p s  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 2 )    St e l l i n g  Ro a d  an d  St e v e n s  Cr e e k  Bo u l e v a r d ( # 3 )    Su n n y v a l e ‐Sa r a t o g a  Ro a d / D e  An z a  Bo u l e v a r d  an d  Ho m e s t e a d  Ro a d  (# 5 )    De  An z a  Bo u l e v a r d  an d  I‐28 0  No r t h b o u n d  Ra m p  (# 6 )    De  An z a  Bo u l e v a r d .  an d  I‐28 0  So u t h b o u n d  Ra m p  (# 7 )    De  An z a  Bo u l e v a r d  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 8 )    Wo l f e  Ro a d  an d  I‐28 0  No r t h b o u n d  Ra m p  (# 1 8 )    Wo l f e  Ro a d  an d  I‐28 0  So u t h b o u n d  Ra m p  (# 1 9 )    Wo l f e  Ro a d / M i l l e r  Av e n u e  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 2 1 )    St e v e n s  Cr e e k  Bo u l e v a r d  an d  I‐28 0  Ra m p s / C a l v e r t  Dr i v e  (# 2 9 )    La w r e n c e  Ex p r e s s w a y  So u t h b o u n d  Ra m p  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (C o u n t y )  (# 3 1 )    La w r e n c e  Ex p r e s s w a y  No r t h b o u n d  Ra m p  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (C o u n t y )  (# 3 2 )   13 9 2   No v e m b e r  3, 2014 | Page 24  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e Ch a p t e r  5:  Al t e r n a t i v e s  of  th e  Pr o p o s e d  Pr o j e c t  of  th e  Dr a f t  EI R 5‐3  Al t e r n a t i v e s   Co m p a r i s o n 5  Ta b l e  5‐3  Al t e r n a t i v e s  Co m p a r i s o n  Su m m a r y  At  20 4 0  Bu i l d o u t Ca t e g o r y   Ex i s t i n g  20 1 3   Bu i l t / A p p r o v e d   Pr o p o s e d    Pr o j e c t a  No    Pr o j e c t b  La n d  Us e    Al t e r n a t i v e  A  Land Use  Alternative B  Jo b s   21 , 3 9 9 2 7 , 3 8 7   44 , 2 4 2   30 , 8 4 8   32 , 5 9 3   39,092    Ch a p t e r  5. 1 :  No  Pr o j e c t  Al t e r n a t i v e  of  th e  Dr a f t  EI R 5. 1 ‐1  No  Pr o j e c t   Al t e r n a t i v e 6  Ta b l e  5. 1 ‐1 No  Pr o j e c t  Al t e r n a t i v e  De v e l o p m e n t  Al l o c a t i o n  & Pr o j e c t i o n s  Su m m a r y Ca t e g o r y   Ex i s t i n g    (2 0 1 3 ) a  Re m a i n i n g    Ne t  Ne w  Pr o p o s e d   No    Pr o j e c t b  Buildout  (2040)c  Jo b s   27 , 3 8 7 2 1 , 3 9 9   3, 4 6 1 e  0  3, 4 6 1 e  30,848    5. 1 ‐50   Si t i n g  Ne w  Od o r   So u r c e s   Wh i l e  no t  al l  so u r c e s  in  Ta b l e  4. 2 ‐10 ,  in  Ch a p t e r  4. 2 ,  Ai r  Qu a l i t y ,  of  th i s  Dr a f t  EI R ,  ar e  fo u n d  in  Cu p e r t i n o  (e . g .  re n d e r i n g  plants, confined  an i m a l  fa c i l i t i e s ) ,  co m m e r c i a l  an d  in d u s t r i a l  ar e a s  in  th e  Ci t y  of  Cu p e r t i n o  ha v e  th e  po t e n t i a l  to  in c l u d e  la n d  us e s  that generate  ob j e c t i o n a b l e  od o r s .  Bu i l d o u t  pe r m i t t e d  un d e r  th e  No  Pr o j e c t  Al t e rn a t iv e  co u l d  in c l u d e  ne w  so u r c e s  of  od o r s ,  su c h  as composting,  gr e e n w a s t e ,  an d  re c y c l i n g  op e r a t i o n s ;  fo o d  pr o c e s s i n g ;  ch e m i c a l  ma n u f a c t u r i n g ;  an d  pa i n t i n g / c o a t i n g  op e r a t i o n s ,  because these are  pe r m i t t e d  us e s  in  th e  co m m e r c i a l  an d / o r  in d u s t r i a l  ar e a s  in  th e  Ci t y .  Fu t u r e  en v i r o n m e n t a l  re v i e w  co u l d  be  re q u i r e d  for industrial projects  li s t e d  in  Ta b l e  4. 2 ‐84 . 2 ‐9,  in  Ch a p t e r  4. 2 ,  Ai r  Qu a l i t y ,  of  th i s  Dr a f t  EI R ,  to  en s u r e  th a t  se n s i t i v e  la n d  us e s  ar e  no t  exposed to objectionable  od o r s .   5. 1 ‐55   Im p a c t  BI O ‐3  De v e l o p m e n t  an d  la n d  us e  ac t i v i t i e s  co n s i s t e n t  wi t h  th e  No  Pr o j e c t  Al t e r n a t i v e  co m p o n e n t s  oc c u r  in  ur b a n i z e d  areas where jurisdictional  wa t e r s  ar e  ab s e n t .  In d i r e c t  im p a c t s  to  we t l a n d s  an d  ju r i s d i c t i o n a l  ot h e r  wa t e r s  in c l u d e :  1)  an  in c r e a s e  in  th e  po t e n t i a l  for sedimentation                                                                                                                           5 Ta b l e  5‐3 li s t s  de v e l o p m e n t  al l o c a t i o n s  fo r  al l  ca t e g o r i e s ;  ho w e v e r ,  on l y  th e  ex i s t i n g  jo b  nu m b e r  wa s  re v i s e d .   6 Ta b l e  5. 1 ‐1 li s t s  de v e l o p m e n t  al l o c a t i o n s  fo r  al l  ca t e g o r i e s ;  ho w e v e r ,  on l y  th e  ex i s t i n g  jo b  nu m b e r  wa s  re v i s e d .   13 9 3   No v e m b e r  3, 2014 | Page 25  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e du e  to  co n s t r u c t i o n  gr a d i n g  an d  gr o u n d  di s t u r b a n c e ,  2)  an  in c r e a s e  in  th e  po t e n t i a l  fo r  er o s i o n  du e  to  in c r e a s e d  runoff volumes generated  by  im p e r v i o u s  su r f a c e s ,  an d  3)  an  in c r e a s e  in  th e  po t e n t i a l  fo r  wa t e r  qu a l i t y  de g r a d a t i o n  du e  to  in c r e a s e d  le v e l s  in non‐point pollutants.  Ho w e v e r ,  in d i r e c t  im p a c t s  co u l d  be  la r g e l y  av o i d e d  th r o u g h  ef f e c t i v e  im p l e m e n t a t i o n  of  Be s t  Ma n a g e m e n t  Pr a c t i c e s  (BMPs) during  co n s t r u c t i o n  an d  co m p l i a n c e  wi t h  wa t e r  qu a l i t y  co n tr o l s .  As  di s c u s s e d  in  Se c t i o n  4. 8 . 1 . 1 ,  Re g u l a t o r y  Fr a m e w o r k ,  of Chapter 4.94.8,  Hy d r o l o g y  an d  Wa t e r  Qu a l i t y ,  of  th i s  Dr a f t  EI R ,  wa t e r  qu a l i t y  in  st o r m w a t e r  ru n o f f  is  re g u l a t e d  lo c a l l y  by  th e  Sa n t a  Clara Valley Urban  Ru n o f f  Po l l u t i o n  Pr e v e n t i o n  Pr o g r a m  (S C V U R P P P ) ,  wh i c h  in c l u d e s  pr o v i s i o n  C. 3  of  th e  Mu n i c i p a l  Re g i o n a l  St o r m  Water National Pollutant  Di s c h a r g e  El i m i n a t i o n  Sy s t e m  (N P D E S )  Pe r m i t  (M R P )  ad o p t e d  by  th e  Sa n  Fr a n c i s c o  Ba y  Re g i o n a l  Wa t e r  Qu a l i t y  Control Board (RWQCB).  5. 1 ‐78   Im p a c t  HA Z ‐2  Th e  No  Pr o j e c t  Al t e r n a t i v e  wo u l d  fa c i l i t a t e  ne w  de v e l o p m e n t ,  in c l u d i n g  re s i d e n t i a l ,  mi x e d ‐us e ,  an d  co m m e r c i a l  uses, within Cupertino.  So m e  of  th e  ne w  de v e l o p m e n t  co u l d  oc c u r  on  pr o p e r t i e s  th a t  po s s i b l y  ar e  co n t a m i n a t e d  an d  in a c t i v e ,  un d e r g o i n g  evaluation, and/or  un d e r g o i n g  co r r e c t i v e  ac t i o n ,  as  in d i c a t e d  in  Ta b l e  4. 7 . 1 4 . 7 ‐2 of  Ch a p t e r  4. 7 ,  Ha z a r d s  an d  Ha z ar d o u s  Ma t e r i a l s .   5. 1 ‐13 0   Im p a c t  TR A F ‐1 –  In t e r s e c t i o n   Op e r a t i o n s   As  sh o w n  on  Ta b l e  5. 1 ‐10  an d  li s t e d  be l o w ,  th e  No  Pr o j e c t  Al t e r n a t i v e  wo u l d  re s u l t  in  si g n i f i c a n t  im p a c t s  to  ei g h t  (8) intersections during  th e  AM  pe a k  ho u r ,  th e  PM  pe a k  ho u r  or  bo t h  pe a k  ho u r s .  Th e  in t e r s e c t i o n  nu m b e r ,  as  us e d  wi t h i n  th e  Ta b l e  5. 1 ‐10, is shown in  pa r e n t h e s e s .    Ho m e s t e a d  Ro a d  an d  De  An z a  Bo u l e v a r d / S a r a t o g a ‐Su n n y v a l e  Ro a d  (# 5 ) :  LO S  E – PM  pe a k  ho u r    De  An z a  Bo u l e v a r d  an d  I‐28 0  No r t h b o u n d  Ra m p  (# 6 ) :  LO S  E – PM  pe a k  ho u r    De  An z a  Bo u l e v a r d  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 8 ) :  LO S  E ‐   – PM  pe a k  ho u r    De  An z a  Bo u l e v a r d  an d  Mc C l e l l a n  Ro a d / P a c i f i c a  Dr i v e  (# 9 ) :  LO S  E – PM  pe a k  ho u r    Wo l f e  Ro a d  an d  I‐28 0  No r t h b o u n d  Ra m p  (# 1 8 ) :  LO S  F – AM  pe a k  ho u r    Wo l f e  Ro a d / M i l l e r  Av e n u e  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 2 1 ) :  LO S  E – PM  pe a k  ho u r     Ta n t a u  Av e n u e  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 2 7 ) :  LO S  E+  – PM  pe a k  ho u r    St e v e n s  Cr e e k  Bo u l e v a r d  an d  I‐28 0  SB  Ra m p s / C a l v e r t  Dr i v e  (# 2 9 ) :  LO S  F – PM  pe a k  ho u r   5. 1 ‐13 1   Mi t i g a t i o n  Me a s u r e   TR A F ‐1   St e v e n s  Cr e e k  Bo u l e v a r d  an d  I‐28 0  SB  Ra m p s / C a l v e r t  Dr i v e  (# 2 9 ) :  Ma k e  th e  ea s t b o u n d  to  so u t h b o u n d  ri g h t  turn a free movement.  Th i s  wo u l d  re q u i r e  bu i l d i n g  an  is l a n d  an d  se p a r a t i n g  th e  ri g h t  tu r n  fr o m  si g n a l  co n t r o l .  It  al s o  wo u l d  re q u i r e  building a third  so u t h b o u n d  la n e  on  Ca l v e r t  Dr i v e  to  re c e i v e  th e  ri g h t  tu r n  tr a f f i c .    5. 1 ‐13 5   Mi t i g a t i o n  Me a s u r e   TR A F ‐2 – CM P   Im p a c t s   Of  th e  41  st u d y  in t e r s e c t i o n s  in c l u d e d  in  th i s  EI R  do c u m e n t ,  21  ar e  in c l u d e d  in  Sa n t a  Cl a r a  Co u n t y ’ s  CM P .  As  sh o w n  on Table 5.1‐910 and  li s t e d  ab o v e ,  th e  re s u l t s  in d i c a t e  th a t  th e  fo l l o w i n g  si x  (6 )  fi v e  (5 )  CM P  st u d y  in t e r s e c t i o n s  wo u l d  op e r a t e  at  un a c c e p t a b l e  levels of service  du r i n g  th e  AM  pe a k  ho u r ,  th e  PM  pe a k  ho u r  or  bo t h  pe a k  ho u r s  un d e r  th e  20 4 0  No  Pr o j e c t  co n d i t i o n s .  Th e  in t e r s e c t i o n  number, as used  13 9 4   No v e m b e r  3, 2014 | Page 26  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e wi t h i n  th e  Ta b l e  5. 1 ‐91 0 ,  is  sh o w n  in  pa r e n t h e s e s .    Ho m e s t e a d  Ro a d  an d  De  An z a  Bo u l e v a r d / S a r a t o g a ‐Su n n y v a l e  Ro a d  (# 5 ) :  LO S  E – PM  pe a k  ho u r    De  An z a  Bo u l e v a r d  an d  I‐28 0  No r t h b o u n d  Ra m p  (# 6 ) :  LO S  E – PM  pe a k  ho u r    De  An z a  Bo u l e v a r d  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 8 ) :  LO S  FE ‐  – PM  pe a k  ho u r    Wo l f e  Ro a d  an d  I‐28 0  No r t h b o u n d  Ra m p  (# 1 8 ) :  LO S  F – AM  pe a k  ho u r    Wo l f e  Ro a d / M i l l e r  Av e n u e  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 2 1 ) :  LO S  E – PM  pe a k  ho u r     I‐28 0  So u t h b o u n d  Ra m p  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 2 9 ) :  LO S  F – PM  pe a k  ho u r     Of  th e  ab o v e  si x  in t e r s e c t i o n s ,  on l y  th r e e  tw o  of  th e m  – th o s e  wi t h  an  LO S  E‐  or  LO S  F ‐ ‐   wo u l d  fa l l  be l o w  th e  VT A ’ s  CMP standard, which is  LO S  E.  Th e  th r e e  CM P  in t e r s e c t i o n s  th a t  ar e  wi t h i n  Cu p e r t i n o ’ s  ju r i s d i c t i o n  an d  ha v e  LO S  E (# 5 ,  #6 ,  an d  #2 1 )  do  not actually fall below the  CM P  st a n d a r d ,  bu t  on l y  be l o w  th e  Ci t y  of  Cu p e r t i n o ’ s  st a n d a r d  of  D re s u l t i n g  in  a si g n i f i c a n t  im p a c t .   Ch a p t e r  5. 2 :  La n d  Us e  Al t e r n a t i v e  A of  th e  Dr a f t  EI R 5. 2 ‐1  La n d   Us e   Al t e r a t i v e   A  TAB L E  5. 2 ‐1  LAN D  USE  ALT E R N A T I V E  A DEV E L O P M E N T  ALL O C A T I O N    & PRO J E C T I O N S  SUM M A R Y   Ca t e g o r y   Ex i s t i n g a  (2 0 1 3 )   Re m a i n i n g   (N o  Pr o j e c t )    Ne t  Ne w    Pr o p o s e d   To t a l  in  La n d  Us e    Al t e r n a t i v e  Ab  Buildout  (2040)bc    5. 2 ‐58   Si t i n g   Ne w   Od o r   So u r c e s   Wh i l e   no t   al l   so u r c e s   in   Ta b l e   4. 2 ‐10 ,   in   Ch a p t e r   4. 2 ,   Ai r   Qu a l i t y ,   of   th i s   Dr a f t   EI R ,   ar e   fo u n d   in   Cu p e r t i n o   (e . g .  rendering plants, confined  an i m a l   fa c i l i t i e s ) ,   co m m e r c i a l   an d   in d u s t r i a l   ar e a s   in   th e   Ci t y   of   Cu p e r t i n o   ha v e   th e   po t e n t i a l   to   in c l u d e  land uses that generate  ob j e c t i o n a b l e   od o r s .   Bu i l d o u t   pe r m i t t e d   un d e r   La n d   Us e   Al t e rn a t iv e   A  co u l d   in c l u d e   ne w   so u r c e s   of   od o r s ,  such as composting,  gr e e n w a s t e ,   an d   re c y c l i n g   op e r a t i o n s ;   fo o d   pr o c e s s i n g ;   ch e m i c a l   ma n u f a c t u r i n g ;   an d   pa i n t i n g / c o a t i n g   op e r a t i o n s ,  because these are  pe r m i t t e d  us e s  in  th e  co m m e r c i a l  an d / o r  in d u s t r i a l  ar e a s  in  th e  Ci t y .  Fu t u r e  en v i r o n m e n t a l  re v i e w  co u l d  be  re q u i r e d  for industrial projects  li s t e d  in   Ta b l e  4. 2 ‐84 . 2 ‐9,   in   Ch a p t e r   4. 2 ,   Ai r   Qu a l i t y ,   of  th i s   Dr a f t   EI R ,   to  en s u r e   th a t   se n s i t i v e  la n d  us e s  ar e   no t  exposed to objectionable  od o r s .   5. 2 ‐62   Im p a c t  BI O ‐3  De v e l o p m e n t   an d   la n d   us e   ac t i v i t i e s   co n s i s t e n t   wi t h   La n d   Us e   Al t e r n a t i v e   A  Co m p o n e n t s   wo u l d   oc c u r   in urbanized areas where  ju r i s d i c t i o n a l   wa t e r s   ar e   ab s e n t .   In d i r e c t   im p a c t s   to   we t l a n d s   an d   ju r i s d i c t i o n a l   ot h e r   wa t e r s   in c l u d e :   1)   an   in c r e a s e  in the potential for  se d i m e n t a t i o n   du e   to   co n s t r u c t i o n   gr a d i n g   an d   gr o u n d   di s t u r b a n c e ,   2)   an   in c r e a s e   in   th e   po t e n t ia l   fo r   er o s i o n  due to increased runoff  vo l u m e s   ge n e r a t e d   by   im p e r v i o u s   su r f a c e s ,   an d   3)   an   in c r e a s e   in   th e   po t e n t i a l   fo r   wa t e r   qu a l i t y   de g r a d a t i o n  due to increased levels in  no n ‐po i n t  po l l u t a n t s .  Ho w e v e r ,  in d i r e c t  im p a c t s  co u l d  be  la r g e l y  av o i d e d  th r o u g h  ef f e c t i v e  im p l e m e n t a t i o n  of  Best Management Practices  13 9 5   No v e m b e r  3, 2014 | Page 27  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e du r i n g  co n s t r u c t i o n  an d  co m p l i a n c e  wi t h  wa t e r  qu a l i t y  co n t r o l s .  As  di s c u s s e d  in  Se c t i o n  4. 8 . 1 . 1 ,  Re g u l a t o r y  Fr a m e w o r k ,  of Chapter 4.94.8,  Hy d r o l o g y   an d   Wa t e r   Qu a l i t y ,   of   th i s   Dr a f t   EI R ,   wa t e r   qu a l i t y   in   st o r m w a t e r   ru n o f f   is   re g u l a t e d   lo c a l l y   by   th e  Santa Clara Valley Urban  Ru n o f f   Po l l u t i o n   Pr e v e n t i o n  Pr o g r a m  (S C V U R P P P ) ,   wh i c h   in c l u d e s   pr o v i s i o n  C. 3   of   th e   Mu n i c i p a l   Re g i o n a l   St o r m  Water National Pollutant  Di s c h a r g e  El i m i n a t i o n  Sy s t e m  (N P D E S )  Pe r m i t  (M R P ) ,  ad o p t e d  by  th e  Sa n  Fr a n c i s c o  Ba y  Re g i o n a l  Wa t e r  Qu a l i t y  Control Board (RWQCB).   5. 2 ‐88   Im p a c t  HA Z ‐2  La n d   Us e   Al t e r n a t i v e   A  wo u l d   fa c i l i t a t e  ne w   de v e l o p m e n t ,   in c l u d i n g   re s i d e n t i a l ,   mi x e d ‐us e ,   an d   co m m e r c i a l  us e s ,  within Cupertino. Some  of  th e  ne w  de v e l o p m e n t  co u l d  oc c u r  on  pr o p e r t i e s  th a t  po s s i b l y  ar e  co n t a m i n a t e d  an d  in a c t i v e ,  un d e r g o i n g  ev a l u a t i o n ,  and/or undergoing  co r r e c t i v e  ac t i o n ,  as  in d i c a t e d  in  Ta b l e  4. 7 . 1 4 . 7 ‐2.   5. 2 ‐13 2   Im p a c t   PO P ‐1  –  Re g i o n a l  Pl a n n i n g   Wi t h   re s p e c t   to  jo b s ,  AB A G  pr o j e c t s  an  in c r e a s e   of  7, 0 4 0  jo b s  fo r  a  to t a l  of  33 , 3 6 0   jo b s   in  20 4 0 ,  as  sh o w n   in  Ta b l e  4.11‐1 in Chapter 4.11,  Po p u l a t i o n  an d  Ho u s i n g ,  of  th i s  Dr a f t  EI R .  As  sh o w n  in  Ta b l e  5. 2 ‐9,  wh e n  ap p l y i n g  th e  Ci t y ’ s  jo b  ge n e r a t i o n  ra t e s  for office, commercial and  ho t e l   de v e l o p m e n t ,   bu i l d o u t   of   th i s   Al t e r n a t i v e   co u l d   re s u l t   in   as   ma n y   as   5, 2 0 6   ad d i t i o n a l   jo b s   fo r   a  to t a l   of   32,593 jobs in 2040, which  wo u l d  be  wi t h i n  th e  re g i o n a l  jo b  pr o j e c t i o n s  (1 9  pe r c e n t  co m p a r e d  to  27  pe r c e n t ) .    5. 2 ‐13 4   Im p a c t  PO P ‐2  As   pr e v i o u s l y   de s c r i b e d ,   im p l e m e n t a t i o n   of   La n d   Us e   Al t e r n a t i v e   A  wo u l d   in c l u d e   Ge n e r a l   Pl a n   Zo n i n g   de s i g n a t i o n  and development  st a n d a r d  am e n d m e n t s  th e  fo l l o w i n g  Ho u s i n g  El e m e n t  Si t e s :     Ho u s i n g   El e m e n t   Si t e  16  (S u m m e r w i n d s   an d  Gr a n i t e  Ro c k ) .   Th e   pe r m i t t e d  de n s i t y  wo u l d   in c r e a s e  fr o m   15  du/ac to 25 du/ac and the  Zo n i n g   de s i g n a t i o n   wo u l d   be   ch a n g e d   fr o m   Pl a n n e d   De v e l o p m e n t   wi t h   Ge n e r a l   Co m m e r c i a l   an d   Re s i d e n t i a l  (P(CG, Res 5‐15)) to  (P ( C G ,  Re s ) ) .    Ho u s i n g  El e m e n t  Si t e  18  (T h e  Oa k s  Sh o p p i n g  Ce n t e r ) .  Th e  Zo n i n g  de s i g n a t i o n  wo u l d  ch a n g e  fr o m  P( C G )  to  Planned Development with  Ge n e r a l   Co m m e r c i a l ,    an d   Re s i d e n t i a l ,   an d   Pr o f e s s i o n a l   Of f i c e   (P ( C G ,   Re s ,   OP ) )   to   al l o w   fo r   fu t u r e   mi x e d ‐use development including  re s i d e n t i a l  us e s .   13 9 6   No v e m b e r  3, 2014 | Page 28  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 5. 2 ‐14 9   Im p a c t  TR A F ‐1 –  In t e r s e c t i o n  Le v e l s   of  Se r v i c e   As  sh o w n  in  Ta b l e  5. 2 ‐10 ,  th e  fo l l o w i n g  th r e e  in t e r s e c t i o n s  wo u l d  op e r a t e  at  an  un a c c e p t a b l e  le v e l  un d e r  bo t h  No Project and Land Use  Al t e r n a t i v e  A co n d i t i o n s ,  bu t  La n d  Us e  Al t e r n a t i v e  A wo u l d  no t  ha v e  a si g n i f i c a n t  im p a c t  on  th e i r  op e r a t i o n s :    De  An z a  Bo u l e v a r d  an d  Mc C l e l l a n  Ro a d / P a c i f i c a  Dr i v e  (# 9 ) :  LO S  E – PM  Pe a k  Ho u r     Wo l f e  Ro a d / M i l l e r  Av e n u e  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 2 1 ) :  LO S  E – PM  Pe a k  Ho u r     Ta n t a u  Av e n u e  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 2 7 ) :  LO S  E+  – PM  Pe a k  Ho u r    St e v e n s  Cr e e k  Bo u l e v a r d  an d  I‐28 0  SB  Ra m p s / C a l v e r t  Dr i v e  (# 2 9 ) :  LO S  F – PM  Pe a k  Ho u r   5. 2 ‐15 0   Im p a c t  TR A F ‐1 –  In t e r s e c t i o n  Le v e l s   of  Se r v i c e   As  sh o w n  in  Ta b l e  5. 2 ‐10 ,  La n d  Us e  Al t e r n a t i v e  A wo u l d  re s u l t  in  si g n i f i c a n t  im p a c t s  du r i n g  at  le a s t  on e  of  th e  pe a k  hours. The following  fo u r  (4 )  in t e r s e c t i o n s  wo u l d  ex p e r i e n c e  a si g n i f i c a n t  im p a c t  un d e r  La n d  Us e  Al t e r n a t i v e  A tr a f f i c  co n d i t i o n s :     Su n n y v a l e ‐Sa r a t o g a  Ro a d / D e  An z a  Bo u l e v a r d  an d  Ho m e s t e a d  Ro a d  (# 5 ) :  LO S  E+  an d  EF  – AM  an d  PM  Pe a k  Hours, respectively   De  An z a  Bo u l e v a r d  an d  I‐28 0  No r t h b o u n d  Ra m p  (# 6 ) :  LO S  F – PM  Pe a k  Ho u r    De  An z a  Bo u l e v a r d  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 8 ) :  LO S  FE ‐  – PM  Pe a k  Ho u r    Wo l f e  Ro a d  an d  I‐28 0  No r t h b o u n d  Ra m p  (# 1 8 ) :  LO S  F – AM  Pe a k  Ho u r   5. 2 ‐15 7   Im p a c t  TR A F ‐2 –  CM P  Im p a c t s   Of  th e  41  st u d y  in t e r s e c t i o n s  in c l u d e d  in  th i s  EI R  do c u m e n t ,  21  ar e  in c l u d e d  in  Sa n t a  Cl a r a  Co u n t y ’ s  Co n g e s t i o n  Management Program  (C M P ) .    Im p a c t  TR A F ‐1,  wh i c h  pr e s e n t s  th e  re s u l t s  of  th e  im p a c t  an a l y s i s  un d e r  20 4 0  No  Pr o j e c t  Co n d i t i o n s  an d  the Land Use Alternative A  on  al l  of  th e  st u d y  in t e r s e c t i o n s ,  in c l u d e s  th e  21  CM P  in t e r s e c t i o n s .  La n d  Us e  Al t e rna t i v e  A re s u l t e d  in  si g n i f i c a n t  impacts to five (5) four  (4 )  CM P  in t e r s e c t i o n s .  Th e  fo l l o w i n g  fo u r  CM P  in t e r s e c t i o n s  ex p e r i e n c e d  a si g n i f i c a n t  im p a c t  du r i n g  at  le a s t  on e  of the peak hours:    Sa r a t o g a ‐Su n n y v a l e  Ro a d / D e  An z a  Bo u l e v a r d  an d  Ho m e s t e a d  Ro a d  (# 5 ) :  LO S  E+  an d  F – AM  an d  PM  pe a k  hours, respectively   De  An z a  Bo u l e v a r d  an d  I‐28 0  No r t h b o u n d  Ra m p s  (# 6 ) :  LO S  F – PM  pe a k  ho u r    De  An z a  Bo u l e v a r d  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 8 ) :  LO S  E‐  – PM  pe a k  ho u r    Wo l f e  Ro a d  an d  I‐28 0  No r t h b o u n d  Ra m p  (# 1 8 ) :  LO S  F – AM  pe a k  ho u r    Of  th e  ab o v e  fo u r  in t e r s e c t i o n s ,  tw o  of  th e m  Al l  fo u r  of  th e  ab o v e  in t e r s e c t i o n s  wo u l d  fa l l  be l o w  VT A ’ s  CM P  st a n d a r d ,  which is LOS E.  The  tw o  CM P  in t e r s e c t i o n s  th a t  ar e  wi t h i n  Cu p e r t i n o ’ s  ju r i s d i c t i o n  an d  wo u l d  op e r a t e  at  LO S  E (S a r a t o g a ‐Su n n y v a l e  Road/De Anza Boulevard  an d  Ho m e s t e a d  Ro a d  [# 5 ]  an d  De  An z a  Bo u l e v a r d  an d  St e v e n s  Cr e e k  Bo u l e v a r d  [# 8 ] )  Sa r a t o g a ‐Su n n y v a l e  Ro a d / D e  Anza Boulevard and  Ho m e s t e a d  Ro a d  (# 5 ) ,  wh i c h  is  a CM P  in t e r s e c t i o n  th a t  is  wi t h i n  Cu p e r t i n o ’ s  ju r i s d i c t i o n  an d  wo u l d  op e r a t e  ab o v e  LOS E during the AM  pe a k  ho u r ,  do e s  no t  ac t u a l l y  fa l l  be l o w  th e  CM P  st a n d a r d ,  bu t  on l y  be l o w  th e  Ci t y  of  Cu p e r t i n o ’ s  st a n d a r d  of  LO S  D. It does, however, fall  be l o w  th e  CM P  st a n d a r d  fo r  th e  PM  pe a k  ho u r .   13 9 7   No v e m b e r  3, 2014 | Page 29  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 5. 2 ‐16 1   Im p a c t  UT I L ‐1 – Ca l   Wa t e r   Fo r  La n d  Us e  Al t e r n a t i v e  A,  it  is  as s u m e d  th a t  pr o j e c t e d  wa t e r  de m a n d  wo u l d  be  ad d e d  to  th e  LA S  Di s t r i c t  an d  Apple Campus 2 demands.  Al s o ,  it  is  as s u m e d  th a t  de v e l o p m e n t  wo u l d  oc c u r  at  a re l a t i v e l y  co n s t a n t  ra t e  ov e r  La n d  Us e  Al t e r n a t i v e  A’ s  26 ‐year horizon period. The  WS E  in c l u d e s  de t a i l e d  ca l c u l a t i o n s  of  wa t e r  de m a n d  fr o m  La n d Us e Al t e r n a t i v e  A,  ba s e d  on  th e  la n d  us e s  sh o w n  in Table 5.2‐1315. As  sh o w n  in  Ta b l e  5. 2 ‐15 . 1 ,  th e  WS E  de t e r m i n e d  th e  wa t e r  de m a n d  at  bu i l d o u t  (2 0 4 0 )  fo r  La n d  Us e  Al t e r n a t i v e  A in  the Cal Water LAS District  wo u l d  be  80 7  af y .    Th i s  pr o j e c t i o n  wa s  ca l c u l a t e d  us i n g  th e  re d u c e d  pe r c e n t a g e  of  de v e l o p m e n t  fo r  ea c h  la n d  us e  classification and  ap p l y i n g  it  to  th e  de m a n d  es t i m a t e d  fo r  th e  pr o p o s e d  Pr o j e c t .    Ap p l y i n g  a 15  pe r c e n t  re d u c t i o n  fa c t o r  du e  to  wa t e r  conservation  me a s u r e s  to  be  in c o r p o r a t e d  in t o  ne w  de v e l o p m e n t ,  th e  to t a l  LA S  GP  am e n d m e n t  wa t e r  de m a n d  at  bu i l d o u t  (2 0 4 0 )  for Alternative A is  es t i m a t e d  to  be  85  pe r c e n t  of  94 9  af y ,  or  37 . 8  pe r c e n t  of  th e  pr o p o s e d  Pr o j e c t .  Th e r e f o r e ,  th e  fi v e ‐ye a r  in c r e a s e  for Land Use Alternative  A Pr o j e c t  de m a n d  is  16 1  af y .   5. 2 ‐16 4   Im p a c t  UT I L ‐1 – Ca l   Wa t e r  Mu l t i p l e  Dr y   Ye a r s   Ta b l e  5. 2 ‐19  co m p a r e s  de m a n d  to  su p p l y  fo r  a 4 ye a r  mu l t i p l e  dr y  ye a r  pe r i o d .  Fo r  th e  fi r s t  th r e e  ye a r s ,  th e  an a l y s i s  conservatively  as s u m e s  th a t  de m a n d  wo u l d  re m a i n  un c h a n g e d  fr o m  a no r m a l  hy d r o l o g i c  ye a r  an d  th a t  in  th e  fo u r t h  ye a r  de m a n d would decrease by 10  pe r c e n t  as  do e s  th e  de l i v e r y  of  SC W V D  “c o n t r a c t ”  wa t e r .  In  al l  ca s e s ,  th e  su p p l y  is  pr o j e c t e d  to  me e t  10 0  pe r c e n t  of demand. It is noted  th a t  ev e n  if  de m a n d  di d  no t  de c r e a s e  by  10  pe r c e n t  in  ye a r  4 an d  SC V W D  su p p l y  di d ,  th e  in c r e a s e d  gr o u n d w a t e r  supplied in 2040 would  be  1, 5 6 5  ac r e  fe e t  fo r  a to t a l  of  3, 9 6 3 3 , 9 5 4  ac r e  fe e t ,  wh i c h  ca n  be  pu m p e d  by  th e  LA S  Di s t r i c t  by  in c r e a s i n g  we l l  operation times  13 9 8   No v e m b e r  3, 2014 | Page 30  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 5. 2 ‐16 5   Im p a c t  UT I L ‐1 – Ca l   Wa t e r  Mu l t i p l e  Dr y   Ye a r s   TAB L E  5. 2 ‐19   DEM A N D  AN D  SUP P L Y  COM P A R I S O N  ‐ MUL T I P L E  DRY  YEA R  PER I O D  (4  YEA R S ):  CAL  WAT E R  LA S  DIS T R I C T  + LAND USE  ALT E R N A T I V E  A (A F Y )      20 1 5   20 2 0   20 2 5   20 3 0   20 3 5   2040  To t a l  De m a n d :  Ye a r s  1 ‐   3  13 , 6 4 1   12 , 8 1 2   13 , 5 2 2   14 , 2 3 1   14 , 9 4 2   15,654  SC V W D  Su p p l y   10 , 2 0 0   9, 7 0 0   10 , 2 0 0   11 , 2 0 0   12 , 1 2 0   13,000  LA S  Gr o u n d w a t e r   3, 4 4 1   3, 3 7 8   3, 8 5 5   3, 8 3 1   3, 8 8 8   3,984  To t a l  Su p p l y   13 , 6 4 1   13 , 0 7 8   14 , 0 5 5   15 , 0 3 1   16 , 0 0 8   16,984  Di f f e r e n c e   0  26 6   53 3   80 0   1, 0 6 6   1,330  To t a l  De m a n d :  Ye a r  4  12 , 2 7 7   11 , 5 3 0   12 , 1 7 0   12 , 8 0 8   13 , 4 4 8   14,089  SC V W D  Su p p l y   9, 1 8 0   8, 7 3 0   9, 1 8 0   10 , 0 8 0   10 , 9 0 8   11,700  LA S  Gr o u n d w a t e r   3, 0 9 7   2, 8 0 0   2, 9 9 0   2, 7 2 8   2, 5 4 0   2,389  Di f f e r e n c e   0  0  0  0  0  0    Ch a p t e r  5. 3 :  La n d  Us e  Al t e r n a t i v e  B of  th e  Dr a f t  EI R 5. 3 ‐1  Ta b l e  5. 3 ‐1   TAB L E  5. 3 ‐1  LAN D USE ALT E R N A T I V E B DEV E L O P M E N T ALL O C A T I O N & PRO J E C T I O N S SUM M A R Y   Ca t e g o r y   Ex i s t i n g a  (2 0 1 3 )   Re m a i n i n g    (N o  Pr o j e c t )   Ne t  Ne w    Pr o p o s e d   To t a l  In  La n d  Us e    Al t e r n a t i v e  Bb  Buildout  (2040)c  Of f i c e   8, 9 2 9 , 7 7 4  sf   54 0 , 2 3 1  sf   + 2, 0 0 0 , 0 0 0  sf   2, 5 4 0 , 2 3 1  sf   11,470,005 sf  Co m m e r c i a l   3, 7 2 9 , 5 6 9  sf   70 1 , 4 1 3  sf   + 62 5 , 3 3 5  sf d  1, 3 4 3 , 6 7 0  sf g  5,073,248 sf  Ho t e l   1, 0 9 0  ro o m s   33 9  ro o m s   + 50 0  ro o m s   83 9  ro o m s   1,929 rooms  Re s i d e n t i a l   21 , 3 9 9  un i t s   1, 8 9 5  un i t s   + 1, 4 2 1  un i t s   3, 3 1 6  un i t s   24,715 units  13 9 9   No v e m b e r  3, 2014 | Page 31  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e Po p u l a t i o n   58 , 3 0 2    5, 5 7 1   4, 2 0 8   9, 7 4 9 e   68,051  Jo b s   27 , 8 3 7   3, 4 6 1   8, 2 4 2   11 , 7 0 5 f  39,092  No t e :  sf  = sq u a r e  fe e t   a.  Th e  am o u n t  of  de v e l o p m e n t  th a t  is  bu i l t  an d  ap p r o v e d  in  th e  ci t y  an d  th e  po p u l a t i o n  an d  jo b s  ac c o u n t e d  fo r  in 2013.  b.   Th e   “r e m a i n i n g ”  (i . e .   wh a t   is  ex p e c t e d   un d e r   No   Pr o j e c t   “C u r r e n t   Ge n e r a l   Pl a n ”   co n d i t i o n s )   pl u s   th e   “n e t  new proposed” equals the  to t a l  ne w  bu i l d o u t  po t e n t i a l  un d e r  th e  La n d  Us e  Al t e rn a t iv e  B.   c.  Th e  “b u i l t / a p p r o v e d  20 1 3  ba s e l i n e ”  pl u s  th e  “L a n d  Us e  Al t e r n a t i v e  B”  eq u a l s  th e  to t a l  20 4 0  bu i l d o u t  pr o j e c t i o n s .   d.  No  ne t  ne w  co m m e r c i a l  is  pr o p o s e d .  Th i s  nu m b e r  re p r e s e n t s  th e  co m p l e t e  de m o l i t i o n  of  th e  Va l l c o  Ma l l .   e.  Po p u l a t i o n  is  ca l c u l a t e d  by  3, 3 1 6  un i t s  ti m e s  2. 9 4  pe r s o n s  pe r  ho u s e h o l d ,  wh i c h  is  th e  AB A G  20 4 0  es t i m a t e d  generation rate.   f.   Jo b s   ar e   ca l c u l a t e d   ap p l y i n g   th e   Ci t y ’ s   ge n e r a t i o n   ra t e s   as   fo l l o w s ;   2, 5 4 0 , 2 3 1   sq u a r e   fe e t   of   of f i c e   al l o c a t i o n  divided by 300 square  fe e t   eq u a l s   8, 4 6 7   jo b s ;   1, 3 4 3 , 6 7 0   sq u a r e   fe e t   of   co m m e r c i a l   al l o c a t i o n   di v i d e d   by   45 0   sq u a r e   fe e t   eq u a l s   2,986 jobs; and 839 hotel  ro o m s  at  0. 3  jo b s  pe r  ro o m  eq u a l s  25 2  jo b s  fo r  a to t a l  of  11 , 7 0 5  jo b s .    g.   Ne t  ne w  co m me r c i a l   is  no t   pr o p o s e d .  Th i s   nu m b e r  as s u m e s  th a t   th e   ex i s t i n g  Va l l c o   Sh o p p i n g   Ma l l   sq u a r e  footage (1,267,601 sf) will  be  de m o l i s h e d  an d  64 2 , 2 6 6  sf  wi l l  go  ba c k  in t o  th e  Ci t y ‐wi d e  co m m e r c i a l  al l o c a t i o n  po o l .  A Th e  re m a i n i n g  to t a l  of 625,335 sf would be  re s e r v e d   fo r   a  fu t u r e   pr o j e c t   in   th e   Va l l c o   di s t r i c t .   Du e   to   th e   hi g h   va c a n c y   ra t e   at   th e   Va l l c o   Sh o p p i n g   Ma l l   under existing conditions,  th i s  EI R  pr o v i d e s  a  co n s e r v a t i v e  an a l y s i s  fo r   th e   to t a l   co m m e r c i a l  de v e l o p m e n t   al l o c a t i o n   of  1, 3 4 3 , 6 7 9  sq u a r e  feet (i.e. 642,266 square  fe e t  + 70 1 , 4 1 3  sq u a r e  fe e t )  du r i n g  th e  pl a n n i n g  pe r i o d  fo r  Al t e r n a t i v e  B.   So u r c e :  Ci t y  of  Cu p e r t i n o .      14 0 0   No v e m b e r  3, 2014 | Page 32  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 5. 3 ‐7  Ho u s i n g  El e m e n t   Al l o c a t i o n   Al t h o u g h  th e  ex i s t i n g  de v e l o p m e n t  al l o c a t i o n s  wo u l d  li m i t  ov e r a l l  de v e l o p m e n t ,  th e  re s i d e n t i a l  un i t  de v e l o p m e n t  allocation under this  Al t e r n a t i v e  wo u l d  ac c o m m o d a t e  th e  Re g i o n a l  Ho u s i n g  Ne e d s  Al l o c a t i o n  (R H N A )  fo r  th e  20 1 4 – 2 0 2 2  pl a n n i n g  pe r i o d  and allow the city to  me e t  it s  fa i r ‐sh a r e  ho u s i n g  ob l i g a t i o n  of  1, 0 6 4  un i t s .  As  sh o w n  in  Ta b l e  5. 3 ‐1,  th e  re s i d e n t i a l  al l o c a t i o n  un d e r  th i s  Alternative would allow  fo r  th e  co n s t r u c t i o n  of  up  to  3, 3 1 6  3, 3 6 1  un i t s ,  wh i c h  re p r e s e n t s  1, 4 2 1  un i t s  ab o v e  th e  Cu p e r t i n o ’ s  fa i r ‐sh a r e  ho u s i n g  obligation. The  re m a i n i n g  ho u s i n g  de v e l o p m e n t  al l o c a t i o n  wo u l d  be  al l o c a t e d  th r o u g h o u t  th e  ci t y  by  re d u c i n g  th e  to t a l  nu m b e r  of new housing in the  Bu b b  Ro a d  Sp e c i a l  Ar e a  by  94  un i t s  an d  th e  So u t h  De  An z a  Sp e c i a l  Ar e a  by  29  un i t s .   5. 3 ‐6  Ho u s i n g  El e m e n t   Si t e s    Ho u s i n g  El e m e n t  Si t e  11  (V a l l c o  Sh o p p i n g  Di s t r i c t  ex c e p t  Ro s e b o w l ) :  He i g h t  wo u l d  in c r e a s e  fr o m  60  fe e t  to  110 feet in the area  bo u n d e d  by  I‐28 0  to  th e  no r t h ,  Va l l c o  Pa r k w a y  to  th e  so u t h ,  an d  Pe r i m e t e r  Ro a d  to  th e  ea s t  if  fu t u r e  de v e l o p m e n t  includes a retail  co m p o n e n t  an d  pr o v i d e s  co m m u ni t y  be n e f i t s .  He i g h t  wo u l d  no t  in cr e a s e  wi t h  th e  ex c e p t i o n  of  th e  ar e a  al o n g  Stevens Creek  Bo u l e v a r d  an d  N.  Wo l f e  Ro a d  wh e r e  he i g h t  wi l l  in c r e a s e  to  75  fe e t  wi t h  re t a i l  de v e l o p m e n t  an d  co m m u n i t y  benefits. There will be no  ch a n g e  to  re s i d e n t i a l  de n s i t y .  Th e  Ge n e r a l  Pl a n  la n d  us e  de s i g n a t i o n  wo u l d  be  ch a n ge d  fr o m  Co m m e r c i a l / R e s i d e n tial (C/R) to  Co m m e r c i a l R e g i o n a l  Sh o p p i n g / O f f i c e / R e s i d e n t i a l  (C R e g i o n a l  Sh o p p i n g / O / R )  an d  th e  Zo n i n g  de s i g n a t i o n  wo u l d  be changed from  Pl a n n e d  De v e l o p m e n t  wi t h  Re g i o n a l  Sh o p p i n g  (P ( R e g i o n a l  Sh o p p i n g )  to  Pl a n n e d  De v e l o p m e n t  wi t h  Re g i o n a l  Shopping, Professional  Of f i c e  Li g h t  In d u s t r i a l ,  an d  Re s i d e n t i a l  (P ( R e g i o n a l  Sh o p p i n g ,  OM P ,  Re s ) )  to  al l o w  fo r  pr o f e s s i o n a l  of f i c e s  an d  residential uses.   Ho u s i n g  El e m e n t  Si t e  16  (S u m m e r w i n d s  an d  Gr a n i t e  Ro c k ) :  De n s i t y  wo u l d  in c r e a s e  fr o m  15  du / a c  to  25  du / a c .  Zoning designation  wo u l d  ch a n g e  fr o m  Pl a n n e d  De v e l o p m e n t  wi t h  Ge n e r a l  Co m m e r c i a l  an d  Re s i d e n t i a l  (P ( C G ,  Re s  5‐15 ) )  to  Pl a n n e d  Development with  Ge n e r a l  Co m m e r c i a l  an d  Re s i d e n t i a l  (P ( C G ,  Re s ) )  to  al l o w  fo r  re s i d e n t i a l  us e s .  No  ch a n g e s  to  he i g h t  or  th e  General Plan land use  de s i g n a t i o n  wo u l d  oc c u r  an d  he i g h t  li m i t s  wo u l d  in c r e a s e  by  15  fe e t .   5. 3 ‐19   Im p a c t  AE S ‐3:   Ho u s i n g  El e m e n t   Si t e  5 (G l e n b r o o k   Ap a r t m e n t s )   Un d e r  Al t e r n a t i v e  B,  th e r e  wo u l d  be  no  ch a n g e s  to  th e  Ge n e r a l  Pl a n  la n d  us e  de s i g n a t i o n ,  zo n i n g ,  or  de n s i t y .  Ho w e v e r ,  the permitted  he i g h t  wo u l d  be  in c r e a s e d  by  15  fe e t .  Be c a u s e  th i s  Si t e  is  cu r r e n t l y  de v e l o p e d  wi t h  hi g h ‐de n s i t y  ho u s i n g  co m p r i s e d  of numerous 2‐story  st r u c t u r e s  an d  th e  pr o p o s e d  ne w  de v e l o p m e n t  co u l d  co n v e r t  th e  la r g e  ca r p o r t  ar e a s  to  gr o u n d  fl o o r  pa r k i n g  wi t h  new units above without  di s t u r b i n g  th e  ex i s t i n g  re s i d e n t s  or  su r r o u n d i n g  la n d  us e s ,  fu t u r e  de v e l o p m e n t  pe r m i t t e d  un d e r  Al t e r n a t i v e  B wo u l d  not adversely impact  th e  vi s u a l  ch a r a c t e r  of  th e  Si t e  or  it s  su r r o u n d i n g s ;  th u s  im p a c t s  wo u l d  be  le s s  th a n  si g n i f i c a n t .   5. 3 ‐19   Im p a c t  AE S ‐3:   Ho u s i n g  El e m e n t  5  (G l e n b r o o k   Ap a r t m e n t s )    Un d e r  La n d  Us e  Al t e r n a t i v e  B th e r e  wo u l d  be  no  ch a n g e s  to  th e  Ge n e r a l  Pl a n  la n d  us e  de s i g n a t i o n  or  zo n i n g  at  Housing Element Sites 2  (A r y a / S c a n d i n a v i a n  De s i g n ) ,  3 (U n i t e d  Fu r n i t u r e / E a s t  of  Ea s t  Es t a t e s  Dr i v e ) ,  4 (B a r r y  Sw e n s o n ) ,  5 (G l e n b r o o k  Ap a r t m e n t s ) ,  13 (Loree  Sh o p p i n g  Ce n t e r )  an d  19  (C y p r e s s  Bu i l d i n g  As s o c i a t i o n  & Ha l l  Pr o p e r t y ) ;  th u s  im p a c t s  fr o m  fu t u r e  de v e l o p m e n t  permitted under Land Use  Al t e r n a t i v e  B wo u l d  no t  ad v e r s e l y  im p a c t  th e  vi s u a l  ch a r a c t e r  of  th e  Si t e  or  it s  su r r o u n d i n g s ;  th u s  im p a c t s  wo u l d  be less than significant.  5. 3 ‐19   Im p a c t  AE S ‐3:   Ho u s i n g  El e m e n t   Un d e r  La n d  Us e  Al t e r n a t i v e  B,  th e r e  wo u l d  be  no  ch a n g e s  to  th e  Ge n e r a l  Pl a n  la n d  us e  de s i g n a t i o n ;  bu t  no  he i g h t  increases would be  oc c u r  up  to  15  fe e t  (a p p r o x i m a t e l y  on e  st o r y )  an d  th e  la n d  us e s  wo u l d  ge n e r a l l y  re m a i n  th e  sa m e ;  th u s ,  fu t u r e  development permitted  14 0 1   No v e m b e r  3, 2014 | Page 33  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e Si t e  16   (S u m m e r w i n d s  an d   Gr a n i t e  Ro c k )     un d e r  La n d  Us e  Al t e r n a t i v e  B wo u l d  no t  ad v e r s e l y  im p a c t  th e  vi s u a l  ch a r a c t e r  of  th e  Si t e  or  it s  su r r o u n d i n g s ;  th u s  impacts would be less  th a n  si g n i f i c a n t .    5. 3 ‐63   Si t i n g  Ne w  Od o r   So u r c e s   Wh i l e  no t  al l  so u r c e s  in  Ta b l e  4. 2 ‐10 ,  in  Ch a p t e r  4. 2 ,  Ai r  Qu a l i t y ,  of  th i s  Dr a f t  EI R ,  ar e  fo u n d  in  th e  Ci t y  (e . g .  re n d e r i n g  plants, confined  an i m a l  fa c i l i t i e s ) ,  co m m e r c i a l  an d  in d u s t r i a l  ar e a s  in  th e  Ci t y  of  Cu p e r t i n o  ha v e  th e  po t e n t i a l  to  in c l u d e  la n d  us e s  that generate  ob j e c t i o n a b l e  od o r s .  Bu i l d o u t  pe r m i t t e d  un d e r  La n d  Us e  Al t er n a t i v e  B co u l d  in c l u d e  ne w  so u r c e s  of  od o r s ,  su c h  as composting,  gr e e n w a s t e ,  an d  re c y c l i n g  op e r a t i o n s ;  fo o d  pr o c e s s i n g ;  ch e m i c a l  ma n u f a c t u r i n g ;  an d  pa i n t i n g / c o a t i n g  op e r a t i o n s ,  because these are  pe r m i t t e d  us e s  in  th e  co m m e r c i a l  an d / o r  in d u s t r i a l  ar e a s  in  th e  Ci t y .  Fu t u r e  en v i r o n m e n t a l  re v i e w  co u l d  be  re q u i r e d  for industrial projects  li s t e d  in  Ta b l e  4. 2 ‐84 . 2 ‐9,  in  Ch a p t e r  4. 2 ,  Ai r  Qu a l i t y ,  of  th i s  Dr a f t  EI R ,  to  en s u r e  th a t  se n s i t i v e  la n d  us e s  ar e  no t  exposed to objectionable  od o r s .   5. 3 ‐67   Im p a c t  BI O ‐3  De v e l o p m e n t  an d  la n d  us e  ac t i v i t i e s  co n s i s t e n t  wi t h  La n d  Us e  Al t e r n a t i v e  B Co m p o n e n t s  wo u l d  oc c u r  in  ur b a n i z e d  areas where  ju r i s d i c t i o n a l  wa t e r s  ar e  ab s e n t .  In d i r e c t  im p a c t s  to  we t l a n d s  an d  ju r i s d i c t i o n a l  ot h e r  wa t e r s  in c l u d e :  1)  an  in c r e a s e  in the potential for  se d i m e n t a t i o n  du e  to  co n s t r u c t i o n  gr a d i n g  an d  gr o u n d  di s t u r b a n c e ,  2)  an  in c r e a s e  in  th e  po t e n t i a l fo r  er o s i o n  du e  to increased runoff  vo l u m e s  ge n e r a t e d  by  im p e r v i o u s  su r f a c e s ,  an d  3)  an  in c r e a s e  in  th e  po t e n t i a l  fo r  wa t e r  qu a l i t y  de g r a d a t i o n  du e  to increased levels in  no n ‐po i n t  po l l u t a n t s .  Ho w e v e r ,  in d i r e c t  im p a c t s  co u l d  be  la r g e l y  av o i d e d  th r o u g h  ef f e c t i v e  im p l e m e n t a t i o n  of  Be s t  Management Practices  du r i n g  co n s t r u c t i o n  an d  co m p l i a n c e  wi t h  wa t e r  qu al i t y  co n t r o l s .  As  di s c u s s e d  in  Se c t i o n  4. 8 . 1 . 1 ,  Re g u l a t o r y  Fr a m e w o r k ,  of Chapter 4.94.8,  Hy d r o l o g y  an d  Wa t e r  Qu a l i t y ,  of  th i s  Dr a f t  EI R ,  wa t e r  qu a l i t y  in  st o r m w a t e r  ru n o f f  is  re g u l a t e d  lo c a l l y  by  th e  Sa n t a  Clara Valley Urban  Ru n o f f  Po l l u t i o n  Pr e v e n t i o n  Pr o g r a m  (S C V U R P P P ) ,  wh i c h  in c l u d e s  pr o v i s i o n  C. 3  of  th e  Mu n i c i p a l  Re g i o n a l  St o r m  Water National Pollutant  Di s c h a r g e  El i m i n a t i o n  Sy s t e m  (N P D E S )  Pe r m i t  (M R P ) ,  ad o p t e d  by  th e  Sa n  Fr a n c i s c o  Ba y  Re g i o n a l  Wa t e r  Qu a l i t y  Control Board (RWQCB).  5. 3 ‐92   Im p a c t  HA Z ‐2  Th e  pr o p o s e d  Pr o j e c t  wo u l d  fa c i l i t a t e  ne w  de v e l o p m e n t ,  in c l u d i n g  re s i d e n t i a l ,  mi x e d ‐us e ,  an d  co m m e r c i a l  us e s ,  within Cupertino. Some of  th e  ne w  de v e l o p m e n t  co u l d  oc c u r  on  pr o p e r t i e s  th a t  po s s i b l y  ar e  co n t a m i n a t e d  an d  in a c t i v e ,  un d e r g o i n g  ev a l u a t i o n ,  and/or undergoing  co r r e c t i v e  ac t i o n ,  as  in d i c a t e d  in  Ta b l e  4. 7 . 1 4 . 7 ‐2 of  Ch a p t e r  4. 7 ,  Ha z a r d s  an d  Ha z a rd o u s  Ma t e r i a l s .   5. 3 ‐13 8   Im p a c t  PO P ‐2   Ho u s i n g  El e m e n t  Si t e  18  (T h e  Oa k s  Sh o p p i n g  Ce n t e r ) :  He i g h t  wo u l d  in c r e a s e  fr o m  45  fe e t  to  60  fe e t  wi t h  a retail component. Density  wo u l d  in c r e a s e  fr o m  25  du / a c  to  35  du / a c .  Zo n i n g  de s i g n a t i o n  wo u l d  be  ch a n g e d  fr o m  zo n e d  Pl a n n e d  De v e l o p m e n t  with General  Co m m e r c i a l  an d  Pr o f e s s i o n a l  Of f i c e  (P ( C G ,  OP ) )  to  Pl a n n e d  De v e l o p m e n t  wi t h  Ge n e r a l  Co m m e r c i a l , an d  Re s i d e n t i a l , and Professional  Of f i c e  (P ( C G ,  Re s ,  OP ) )  to  al l o w  fo r  fu t u r e  mi x e d ‐us e  de v e l o p m e n t  in c l u d i n g  re s i d e n t i a l  us e s . 14 0 2   No v e m b e r  3, 2014 | Page 34  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 5. 3 ‐14 4   th r o u g h   5. 3 ‐14 5   Im p a c t  PS ‐5 –  Cu p e r t i n o  Un i o n   Sc h o o l  Di s t r i c t   Th e  La n d  Us e  Al t e r n a t i v e  B wo u l d  ge n e r a t e  ap p r o x i m a t e l y  3, 3 6 1  3, 3 1 6  ho u s i n g  un i t s  in  Cu p e r t i n o ; .  Af t e r  su b t r a c t i n g  the 344 units  ex p e c t e d  to  be  lo c a t e d  in t o  th e  SC U S D ,  th e  CU S D  wo u l d  ex p e r i e n c e  an  ad d i t i o n a l  in c r e a s e  in  th e i r  at t e n d a n c e  of  743 students in  el e m e n t a r y  sc h o o l s  an d  20 9  st u d e n t s  in  mi d d l e  sc h o o l s .  Th e  pr o j e c t i o n ,  as  we l l  as  th e  cu r r e n t  en r o l l m e n t ,  in d i c a t e s  that the CUSD would  no t  ha v e  su f f i c i e n t  ca p a c i t y  to  ac c o m m o d a t e  th e  ex p e c t e d  in c r e a s e  in  en r o l l m e n t  by  20 4 0 .  th u s  th e  CU S D  wo u l d  experience additional  st u d e n t s  in  el e m e n t a r y  sc h o o l s  an d  mi d d l e  sc h o o l .  Wi t h  st u d e n t  en r o l l m e n t  al r e a d y  ex c e e d i n g  CU S D ’ s  ca p a c i t y ,  the additional students  wo u l d  ex a c e r b a t e  th e  CU S D ’ s  ca p a c i t y .  In  or d e r  to  ac c o m m o d a t e  ne w  st u d e n t s ,  th e  CU S D  ne e d s  to  ei t h e r  ex p a n d  existing facilities or  co n s t r u c t  ne w  sc h o o l s .  Ho w e v e r ,  Cu p e r t i n o  do e s  no t  ha v e  su f f i c i e n t  lo c a t i o n s  fo r  ne w  sc h o o l  fa c i l i t i e s  to  ac c o m m o d a t e  the increased  en r o l l m e n t  ex p e c t e d .  Ho w e v e r ,  th e  CU S D  wo u l d  re c e i v e  ap p r o x i m a t e l y  $9 . 1  6. 1  mi l l i o n  in  de v e l o p m e n t  im p a c t  fees from Land Use  Al t e r n a t i v e  B,  wh i c h  wo u l d  mi t i g a t e  th e  im p a c t s  fr o m  La n d  Us e  Al t e r n a t i v e  B pe r  SB  50 .  Th e  im p a c t  to  th e  CU S D  would be less than  si g n i f i c a n t .  5. 3 ‐14 5   Im p a c t  PS ‐5 –  Fr e m o n t  Un i f i e d   Sc h o o l  Di s t r i c t   Wi t h  th e  es t i m a t e d  in c r e a s e  of  2, 9 7 2  ne w  ho u s i n g  un i t s  to  Cu p e r t i n o ,  th e  FU H S D  wo u l d  ex p e r i e n c e  in c r e a s e  20 9  new students by 2040.  Al t h o u g h  cu r r e n t  st u d e n t  en r o l l m e n t  al m o s t  eq u a l s  to  it s  ca p a c i t y ,  th e  ad d i t i o n a l  st u d e n t s  wo u l d  in c r e a s e  th e  ca p a c i t y  deficit for the  FU H S D .  Ho w e v e r ,  th e  FU H S D  ha s  be e n  mo d e r n i z i n g  it s  fa c i l i t i e s  wi t h  ad d i t i o n a l  cl a s s r o o m  an d  ca f e t e r i a s  to  co n t i n u o u s l y  address the  ca p a c i t y  de f i c i t  is s u e ,  an d  ad d i t i o n a l  de v e l o p m e n t  im p a c t  fe e  of  $6 4 . 0 6  mi l l i o n  wo u l d  am e l i o r a t e  th e  ca p a c i t y  pr o b l e m .  The impact to the  FU H S D  wo u l d  be  le s s  th a n  si g n i f i c a n t .   5. 3 ‐14 5   Im p a c t  PS ‐5 –   Sa n t a  Cl a r a  Un i f i e d   Sc h o o l  Di s t r i c t   Wi t h  Of  th e  3, 3 1 6  ne w  ho u s i n g  un i t s  wi t h  pr o v i d e d  fo r  in  La n d  Us e  Al t e r n a t i v e  B,  34 4  ne w  ho u s i n g  un i t s  wi l l  be  located in the SCUSD. With  th e  an t i c i p a t e d  34 4  ne w  ho u s i n g  un i t s ,  th e  ex p e c t e d  gr o w t h  in  st u d e n t  en r o l l m e n t  fo r  th e  SC U S D  wo u l d  be  ap p r o x i m a t e l y  28 students (14  fo r  el e m e n t a r y  sc h o o l s ,  7 fo r  mi d d l e  sc h o o l s ,  an d  7 fo r  hi g h  sc h o o l s ) .  in c r e a s e .  Al t h o u g h  in c r e a s e  en r o l l m e n t  wo u l d  add stress to the  sc h o o l  in  th e  SC U S D ,  de v e l o p m e n t  im p a c t  fe e s  fo r  La n d  Us e  Al t e r n a t i v e  B wo u l d  mi t i g a t e  th e  im p a c t  to  th e  SC U S D  facilities; therefore, the  im p a c t s  to  th e  SC U S D  wo u l d  be  le s s   t h a n   s i g n i f i c a n t .  5. 3 ‐15 1   Im p a c t  TR A F ‐1 –  In t e r s e c t i o n  Le v e l s   of  Se r v i c e   Th e  re s u l t s  of  th e  le v e l  of  se r v i c e  an a l y s i s  un d e r  La n d  Us e  Al t e r n a t i v e  B sc e n a r i o  co m p a r e d  to  th e  20 4 0  No  Pr o j e c t  scenario are presented  in  Ta b l e  5. 3 ‐10 .  Th e  re s u l t s  sh o w  th a t ,  of  th e  41  st u d y  in t e r s e c t i o n s ,  29  in t e r s e c t i o n s  wo u l d  op e r a t e  at  an  ac c e p t a b l e  level of service under  La n d  Us e  Al t e r n a t i v e  B,  an d  tw e l v e  (1 2 )  th i r t e e n  (1 3 )  in t e r s e c t i o n s  wo u l d  op e r a t e  at  an  un a c c e p t a b l e  le v e l  of  se r v i c e  during the AM peak  ho u r ,  th e  PM  pe a k  ho u r ,  or  bo t h  pe a k  ho u r s .    5. 3 ‐15 4   Im p a c t  TR A F ‐1 –  In t e r s e c t i o n  Le v e l s   of  Se r v i c e   As  sh o w n  in  Ta b l e  5. 3 ‐10 ,  si x  (6 )  of  th e  el e v e n  (1 1 )  th i r t e e n  (1 3 )  in t e r s e c t i o n s  th a t  wo u l d  op e r a t e  at  an  un a c c e p t a b l e  level of service for at  le a s t  on e  (1 )  pe a k  ho u r  un d e r  La n d  Us e  Al t e r n a t i v e  B we r e  al s o  pr e d i c t e d  to  op e r a t e  at  an  un a c c e p t a b l e  le v e l  of  service under the No  Pr o j e c t  sc e n a r i o .  Th e  Wo l f e  Ro a d / M i l l e r  Av e n u e  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 2 1 )  in t e r s e c t i o n  wo u l d  op e r a t e  at an unacceptable level of  14 0 3   No v e m b e r  3, 2014 | Page 35  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e se r v i c e  fo r  at  le a s t  on e  pe a k  ho u r  un d e r  th e  No  Pr o j e c t  sc e n a r i o  im p r o v e d  fr o m  un a c c e p t a b l e  to  ac c e p t a b l e  le v e l s  of service: LOS E to LOS  D – PM  Pe a k  Ho u r .   5. 3 ‐15 4   th r o u g h   5. 3 ‐15 5   Im p a c t  TR A F ‐1 –  In t e r s e c t i o n  Le v e l s   of  Se r v i c e   Ba s e d  on  ap p l y i n g  th e  si g n i f i c a n c e  cr i t e r i a  fo r  tr a f f i c  im p a c t s  di s c u s s e d  in  Se c t i o n  4. 1 3 . 5 ,  Th r e s h o l d s  of  Si g n i f i c a n c e ,  in Chapter 4.13,  Tr a n s p o r t a t i o n  an d  Tr a f f i c ,  of  th i s  Dr a f t  EI R ,  th e r e  wo u l d  be  a si g n i f i c a n t  im p a c t  at  tw e l v e  (1 2 )  th i r t e e n  (1 3 )  of  th e  study intersections  un d e r  La n d  Us e  Al t e r n a t i v e  B du r i n g  on e  or  bo t h  pe a k  ho u r s ,  as  hi g h l i g h t e d  in  th e  Ta b l e  4. 1 3 ‐10 ,  Ta b l e  5. 3 ‐13 .  Proposed Intersection  Le v e l s  of  Se r v i c e  Ta b l e ,  of  Ch a p t e r  4. 1 3 ,  Tr a n s p o r t a t i o n  an d  Tr a f f i c ,  of  th i s  Dr a f t  EI R .    Th e  fo l l o w i n g  tw e l v e  (1 2 )  th i r t e e n  (1 3 )  in t e r s e c t i o n s  wo u l d  ex p e r i e n c e  a si g n i f i c a n t  im p a c t  un d e r  La n d  Us e  Al t e r n a t i v e  B traffic conditions:    SR  85  No r t h b o u n d  Ra m p s  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 2 ) :  LO S  E – AM  Pe a k  Ho u r    St e l l i n g  Ro a d  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 3 ) :  LO S  F – PM  Pe a k  Ho u r    Su n n y v a l e ‐Sa r a t o g a  Ro a d / D e  An z a  Bo u l e v a r d  an d  Ho m e s t e a d  Ro a d  (# 5 ) :  LO S  E‐  an d  F – AM  an d  PM  Pe a k  Hours, respectively   De  An z a  Bo u l e v a r d  an d  I‐28 0  No r t h b o u n d  Ra m p  (# 6 ) :  LO S  F – AM  an d  PM  Pe a k  Ho u r s    De  An z a  Bo u l e v a r d  an d  I‐28 0  So u t h b o u n d  Ra m p  (# 7 ) :  LO S  F – AM  an d  PM  Pe a k  Ho u r s    De  An z a  Bo u l e v a r d  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 8 ) :  LO S  F – PM  Pe a k  Ho u r    De  An z a  Bo u l e v a r d  an d  Mc C l e l l a n  Ro a d / P a c i f i c a  Dr i v e  (# 9 ) :  LO S  F – PM  Pe a k  Ho u r    Wo l f e  Ro a d  an d  Ho m e s t e a d  Ro a d  (# 1 6 ) :  LO S  EF  – PM  Pe a k  Ho u r    Wo l f e  Ro a d  an d  I‐28 0  No r t h b o u n d  Ra m p  (# 1 8 ) :  LO S  F an d  E+  – AM  an d  PM  Pe a k  Ho u r s ,  re s p e c t i v e l y    No r t h  Ta n t a u  Av e n u e / Q u a i l  Av e n u e  an d  Ho m e s t e a d  Ro a d  (# 2 4 ) :  LO S  E+  – AM  Pe a k  Ho u r    St e v e n s  Cr e e k  Bo u l e v a r d  an d  Ta n t a u  Av e n u e  (# 2 7 ) :  LO S  E – PM  Pe a k  Ho u r    Ag i l e n t  Te c h  Dr i v e w a y  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 3 0 ) :  LO S  E – AM  Pe a k  Ho u r    La w r e n c e  Ex p r e s s w a y  So u t h b o u n d  Ra m p  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 3 1 ) :  LO S  F – AM  Pe a k  Ho u r   5. 3 ‐15 7     Wh i l e  im p l e m e n t a t i o n  of  Mi t i g a t i o n  Me a s u r e  TR A F ‐1 wo u l d  se c u r e  a fu n d i n g  me c h a n i s m  fo r  fu t u r e  ro a d w a y  an d  infrastructure  im p r o v e m e n t s  th a t  ar e  ne c e s s a r y  to  mi t i g a t e  im p a c t s  fr o m  fu t u r e  pr o j e c t s  ba s e d  on  th e n  cu r r e n t  st a n d a r d s ,  im p a c t s  would remain  si g n i f i c a n t   a n d   u n a v o i d a b l e , be c a u s e  th e  Ci t y  ca n n o t  gu a r a n t e e  im p r o v e m e n t s  at  th e s e  in t e r s e c t i o n s  at  th i s  ti m e .  This is in part because  th e  ne x u s  st u d y  ha s  ye t  to  be  pr e p a r e d  an d  be c a u se  so m e  of  th e  im p a c t e d  in t e r s e c t i o n s  ar e  un d e r  th e  ju r i s d i c t i o n s  of the Cities of  Su n n y v a l e  an d  Sa n t a  Cl a r a  an d  Ca l t r a n s .  Sp e c i f i c a l l y ,  th e  fo l l o w i n g  in t e r s e c t i o n s  ar e  ou t s i d e  th e  ju r i s d i c t i o n  of  Cu p e r t i n o :     SR  85  No r t h b o u n d  Ra m p s  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (C a l t r a n s )  (# 2 )    De  An z a  Bo u l e v a r d  an d  I‐28 0  No r t h b o u n d  Ra m p  (C a l t r a n s )  (# 6 )   14 0 4   No v e m b e r  3, 2014 | Page 36  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e  Wo l f e  Ro a d  an d  Ho m e s t e a d  Ro a d  (S u n n y v a l e / C u p e r t i n o )  (# 1 6 )    Wo l f e  Ro a d  an d  I‐28 0  No r t h b o u n d  Ra m p  (C a l t r a n s )  (# 1 8 )    No r t h  Ta n t a u  Av e n u e / Q u a i l  Av e n u e  an d  Ho m e s t e a d  Ro a d  (S u n n y v a l e / C u p e r t i n o )  (# 2 4 )    Ag i l e n t  Te c h  Dr i v e w a y  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (S a n t a  Cl a r a )  (# 3 0 )    La w r e n c e  Ex p r e s s w a y  So u t h b o u n d  Ra m p  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (C M P ,  Co u n t y ) ( # 3 1 )   5. 3 ‐16 8   Im p a c t  UT I L ‐1 –   Ca l  Wa t e r  No r m a l   Hy d r o l o g i c  Ye a r   TAB L E  5. 3 ‐17    DEM A N D  AN D  SUP P L Y  COM P A R I S O N  ‐ NOR M A L  HYD R O L O G I C  YEA R : CAL  WAT E R  LA S  DIS T R I C T  +L AN D  USE  ALT E R N A T I V E  B (AFY)    20 1 5   20 2 0   20 2 5   20 3 0   20 3 5   2040  To t a l  De m a n d   13 , 6 4 1   12 , 9 6 3   13 , 8 2 4   14 , 6 8 5   15 , 5 4 6   16,407  SC V W D  Su p p l y   10 , 2 0 0   9, 7 0 0   10 , 2 0 0   11 , 2 0 0   12 , 1 2 0   13,000  LA S  Gr o u n d w a t e r   3, 4 4 1   3, 3 7 8   3, 8 5 5   3, 8 3 1   3, 8 8 8   3,984  To t a l  Su p p l y   13 , 6 4 1 5   13 , 0 7 8   14 , 0 5 5   15 , 0 3 1   16 , 0 0 8   16,984  Di f f e r e n c e   0  11 5   23 1   34 6   46 2   577  So u r c e :  Ta b l e  14  (C a l  Wa t e r )  of  Wa t e r  Su p p l y  Ev a l u a t i o n  (Y a r n e  & As s o c i a t e s ) ,  Ma y  20 ,  20 1 4 ;  De m a n d  mo d i f i e d  to  re f l e c t  La n d  Us e  Al t e r n a t i v e  B; SVWD Supply and  LA S  Gr o u n d w a t e r  su p p l y  ar e  as  pr e s e n t e d  in  WS E  (i . e .  or i g i n a l  va l u e s  in  Ta b l e  14  of  WS E ) .  No t e :  Th e  su p p l y  su r p l u s  (D i f f e r e n c e )  sh o w n  in the table is theoretical. Total  gr o u n d w a t e r  ac t u a l l y  su p p l i e d  is  th e  qu a n t i t y  ne c e s s a r y  to  ma k e  up  th e  di f f e r e n c e  be t w e e n  LA S  di s t r i c t  de m a n d  an d  SC V WD  su p p l i e s  – both scheduled and Non‐ Co n t r a c t  de l i v e r i e s .  He n c e ,  in  pr a c t i c e ,  to t a l  su p p l y  al w a y s  eq u a l s  pr o j e c t e d  de m a n d  fo r  an y  gi v e n  ye a r .   14 0 5   No v e m b e r  3, 2014 | Page 37  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e Ch a p t e r  6:  CE Q A ‐Re q u i r e d  As s e s s m e n t  Co n c l u s i o n s 6. 7  th r o u g h   6. 8   Si g n i f i c a n t  an d   Un a v o i d a b l e   im p a c t s   TR A F ‐2  Im p l e m e n t a t i o n  of  th e  pr o p o s e d  Pr o j e c t  wo u l d  re s u l t  in  si g n i f i c a n t  an d  un a v o i d a b l e  im p a c t s  to  th e  fo l l o w i n g  four Congestion  Ma n a g e m e n t  Pr o g r a m  (C M P )  in t e r s e c t i o n s  at  le a s t  on e  of  th e  pe a k  ho u r s .   Th e  pr o p o s e d  Pr o j e c t  wo u l d  re s u l t  in  si g n i f i c a n t   a n d   u n a v o i d a b l e  im p a c t s  to  th e  fo l l o w i n g  Sa n t a  Cl a r a  Co u n t y ’ s  Congestion Management  Pr o g r a m  (C M P )  in te r s e c t i o n s  at  le a s t  on e  of  th e  pe a k  ho u r s :    SR  85  No r t h b o u n d  Ra m p s  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 2 )  St e l l i n g  Ro a d  an d  St e v e n s  Cr e e k  Bo u l e v a r d ( # 3 )    Su n n y v a l e ‐Sa r a t o g a  Ro a d / D e  An z a  Bo u l e v a r d  an d  Ho m e s t e a d  Ro a d  (# 5 )    De  An z a  Bo u l e v a r d  an d  I‐28 0  No r t h b o u n d  Ra m p  (# 6 )    De  An z a  Bo u l e v a r d .  an d  I‐28 0  So u t h b o u n d  Ra m p  (# 7 )    De  An z a  Bo u l e v a r d  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 8 )    Wo l f e  Ro a d  an d  I‐28 0  No r t h b o u n d  Ra m p  (# 1 8 )    Wo l f e  Ro a d  an d  I‐28 0  So u t h b o u n d  Ra m p  (# 1 9 )    Wo l f e  Ro a d / M i l l e r  Av e n u e  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (# 2 1 )    St e v e n s  Cr e e k  Bo u l e v a r d  an d  I‐28 0  Ra m p s / C a l v e r t  Dr i v e  (# 2 9 )    La w r e n c e  Ex p r e s s w a y  So u t h b o u n d  Ra m p  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (C o u n t y )  (# 3 1 )    La w r e n c e  Ex p r e s s w a y  No r t h b o u n d  Ra m p  an d  St e v e n s  Cr e e k  Bo u l e v a r d  (C o u n t y )  (# 3 2 ) Ap p e n d i x  F,  Pu b l i c  Se r v i c e s  Da t a :  Sc h o o l  En r o l l m e n t  an d  Fi s c a l  Im p a c t  An a l y s i s  pr e p a r e d  by  Sc h o o l h o u s e  Se r v i c e s ,  of  th e  Dr a f t  EI R 10   Ty p o g r a p h i c a l  er r o r   4. 1    Cu r r e n t  Co n d i t i o n s   Th e  Di s t r i c t  op e r a t e s  25  sc h o o l s ,  20  el e m e n t a r y  sc h o o l s  an d  fi v e  mi d d l e  sc h o o l s .    Th e  el e m e n t a r y  sc h o o l s  se r v e  kindergarten through third  gr a d e  st u d e n t s ,  ex c e p t  fo r  Mc A u l i f f e  wh i c h  in c l u d e s  gr a d e s  ki n d e r g a r t e n  th r o u g h  ei g h t .    Th e  mi d d l e  sc h o o l s  se r v e  sixth through eighth  gr a d e  st u d e n t s .    14 0 6   No v e m b e r  3, 2014 | Page 38  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 12   CU S D  ho u s i n g   br e a k d o w n   Ta b l e  4‐1  Ne w  Ho u s i n g  Un i t s                                 Al t e r n a t i v e s   Ex i s t i n g   Co n d i t i o n s   Mi n i m a l  Gr o w t h   A  Mo d e r a t e  Gr o w t h   B  Most Growth C         By  20 2 3   1, 1 4 0   1, 1 4 0   1, 0 6 0   1,993  To t a l  Ex p e c t e d  in  CU S D   1, 8 4 5   1, 8 4 5   2, 9 6 6 2 , 9 7 2   3,5963,601  To t a l  in  Ci t y  of  Cu p e r t i n o   1, 8 9 5   1, 8 9 5   3, 3 1 6   4,421  So u r c e  Ci t y  of  Cu p e r t i n o   14   CU S D  st u d e n t   br e a k d o w n  by   al t e r n a t i v e     Ta b l e  4‐2  En r o l l m e n t  fr o m  Ne w  Un i t s   Lo c a t e d  in  Cu p e r t i n o  Un i o n  Sc h o o l  Di s t r i c t                                              SG R s   Ex i s t i n g   Co n d i t i o n s   Mi n i m a l    Gr o w t h   A  Mo d e r a t e  Gr o w t h   B  Most  Growth C          By  20 2 3           gr a d e s  K‐5  0. 2 5   28 5   28 5   26 5   498  gr a d e s  6‐8  0. 0 7   80   80   74   140  To t a l  CU S D    36 5   36 5   33 9   638          Fr o m  To t a l  Un i t s  Al l o w e d            gr a d e s  K‐5  0. 2 5   46 1   46 1   74 2 7 4 3   899901  gr a d e s  6‐8  0. 0 7   12 9   12 9   20 8 2 0 9   252253  To t a l  CU S D    59 0   59 0   94 9 9 5 2   1,1511,154  So u r c e s :  En r o l l m e n t  Pr o j e c t i o n  Co n s u l t a n t s  an d  Ci t y  of  Cu p e r t i n o   16   CU S D  To t a l  st u d e n t s   by  al t e r n a t i v e    Ta b l e  4‐3  En r o l l m e n t  by  Sc h o o l  At t e n d a n c e  Ar e a s   14 0 7   No v e m b e r  3, 2014 | Page 39  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e Fr o m  Ne w  Ho u s i n g  Un i t s  in  th e  Ci t y  of  Cu p e r t i n o           By  20 2 3   To t a l     Un i t s   En r o l l m e n t   Un i t s   En r o l l m e n t   Di s t r i c t  To t a l *          Ex i s t i n g  Co n d i t i o n s   1, 1 4 0   28 5   1, 8 4 5   46 1   A ‐   Mi n i m a l  Gr o w t h   1, 1 4 0   28 5   1, 8 4 5   46 1   B ‐   Mo d e r a t e  Gr o w t h   1, 0 6 0   26 5   2, 9 6 6 2 , 9 7 2   74 2 7 4 3   C ‐   Mo s t  Gr o w t h   1, 9 9 3   49 8   3, 5 9 6 3 , 6 0 1   89 9 9 0 1   *T h e  to t a l s  ar e  no t  al w a y s  ex a c t l y  th e  nu m b e r s  in  th e  pr i o r  ta b l e  du e  to  ro u n d i n g .                              So u r c e s :  Ci t y  of  Cu p e r t i n o  an d  Sc h o o l h o u s e  Se r v i c e s   17   CU S D  To t a l  st u d e n t s   by  al t e r n a t i v e    Ta b l e  4‐4  En r o l l m e n t  fr o m  Ne w  Un i t s  by  Sc h o o l  At t e n d a n c e  Ar e a   Cu p e r t i n o  Un i o n  Sc h o o l  Di s t r i c t  Mi d d l e  Sc h o o l s           By  20 2 3   To t a l     Un i t s   En r o l l m e n t   Un i t s   En r o l l m e n t   Di s t r i c t  To t a l *   Ex i s t i n g  Co n d i t i o n s 1, 1 4 0 28 5   1, 8 4 5 46 1 A ‐ Mi n i m a l  Gr o w t h 1, 1 4 0 28 5   1, 8 4 5 46 1 B ‐ Mo d e r a t e  Gr o w t h 1, 0 6 0 26 5   2, 9 6 6 2 , 9 7 2 74 2 7 4 3 C ‐   Mo s t  Gr o w t h   1, 9 9 3   49 8   3, 5 9 6 3 , 6 0 1   89 9 9 0 1   *T h e  to t a l s  ar e  no t  al w a y s  ex a c t l y  th e  nu m b e r s  in  th e  pr i o r  ta b l e  du e  to  ro u n d i n g .                              So u r c e s :  Ci t y  of  Cu p e r t i n o  an d  Sc h o o l h o u s e  Se r v i c e s   21   CU S D  To t a l  st u d e n t s   by  al t e r n a t i v e    Ta b l e  4‐6  En r o l l m e n t  by  Sc h o o l  At t e n d a n c e  Ar e a s   fr o m  Ne w  Un i t s  in  th e  Ci t y  of  Cu p e r t i n o  an d  Ex i s t i n g  Un i t s       En r o l l m e n t  By  20 2 3   En r o l l m e n t  To t a l     Fr o m  Ne w    To t a l    From New   *D i s t r i c t  To t a l          Ex i s t i n g  Co n d i t i o n s   28 5   11 , 8 9 7   46 1   12,073  A ‐   Mi n i m a l  Gr o w t h   28 5   11 , 8 9 7   46 1   12,073  B ‐   Mo d e r a t e  Gr o w t h   26 5   11 , 8 7 7   74 2 7 4 3   12 , 3 5 4 1 2 , 3 5 5   14 0 8   No v e m b e r  3, 2014 | Page 40  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e     C ‐   Mo s t  Gr o w t h   49 8   12 , 1 1 0   89 9 9 0 1   12 , 5 1 1 1 2 , 5 1 2   *T o t a l s  do  no t  in c l u d e  en r o l l m e n t  fr o m  ne w  un i t s  ou t s i d e  of  th e  Ci t y  of  Cu p e r t i n o  no r  ab o u t      12 0  st u d e n t s  wh o  do  no t  re s i d e  in  th e  Di s t r i c t .        So u r c e s :  Ci t y  of  Cu p e r t i n o ,  En r o l l m e n t  Pr o j e c t i o n  Co n s u l t a n t s ,  an d  Sc h o o l h o u s e  Se r v i c e s     23   CU S D  To t a l  st u d e n t s   by  al t e r n a t i v e    Ta b l e  4‐8  Pr o j e c t e d  Mi d d l e  Sc h o o l  En r o l l m e n t  by  Sc h o o l  At t e n d a n c e  Ar e a s   Ne w  an d  Ex i s t i n g  Ho u s i n g  Un i t s  in  th e  Ci t y  of  Cu p e r t i n o          By  20 2 3   To t a l     Fr o m  Ne w   To t a l *   Fr o m  Ne w   Total*  Ex i s t i n g  Co n d i t i o n s   80   6, 3 8 8   12 9   6,437  A ‐   Mi n i m a l  Gr o w t h   80   6, 3 8 8   12 9   6,437  B ‐   Mo d e r a t e  Gr o w t h   74   6, 3 8 2   20 8 2 0 9   6,5166,517  C ‐   Mo s t  Gr o w t h   14 0   6, 4 4 8   25 2 2 5 3   6,5606,561  *T o t a l s   do   no t  in c l u d e   en r o l l m e n t   fr o m  ne w   un i t s  ou t s i d e  of  th e   Ci t y   of  Cu p e r t i n o ,   no r   st u d e n t s  who do not  re s i d e  in  th e  Di s t r i c t ,  ab o u t  12 0  st u d e n t s .    So u r c e s :  Ci t y  of  Cu p e r t i n o ,  En r o l l m e n t  Pr o j e c t i o n  Co n s u l t a n t s ,  an d  Sc h o o l h o u s e  Se r v i c e s     23  ‐   24   Ta b l e  nu m b e r i n g   co r r e c t i o n  on l y   Th e  to t a l  en r o l l m e n t  ca p a c i t y  of  al l  of  CU S D ’ s  sc h o o l s  is  ca l c u l a t e d  in  Ta b l e  4‐89  be l o w .       Ta b l e  4‐89       Cl a s s r o o m  Co u n t  an d  En r o l l m e n t  Ca p a c i t y   25  ‐   26   Ta b l e  nu m b e r i n g   co r r e c t i o n  on l y   Ta b l e  4‐91 0      sh o w s  in f o r m a t i o n  ab o u t  th e  en r o l l m e n t  ca p a c i t y  of  th e s e  sc h o o l s .    En r o l l m e n t  ca p a c i t y ,  th e  la s t  co l u m n ,  is estimated as the  nu m b e r  of  cl a s s r o o m s  av a i l a b l e  ti m e s  th e  ra t i o  be t w e e n  av a i l a b l e  cl a s s r o o m s  an d  en r o l l m e n t  ca p a c i t y  in  th e  la s t  line of Table 4‐89 above.  Ta b l e  4‐91 0   El e m e n t a r y  Sc h o o l s  Lo c a t e d  in  th e  Ci t y  of  Cu p e r t i n o   * En r o l l m e n t  ca p a c i t y  is  eq u a l  to  th e  nu m b e r  of  cl a s s r o o m s  ti m e  23 . 0  st u d e n t s  pe r  ro o m ,  th e  av e r a g e  sh o w n  in  Table 4‐89 above.  14 0 9   No v e m b e r  3, 2014 | Page 41  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 26   Ta b l e  nu m b e r i n g   co r r e c t i o n  on l y   Si m i l a r  in f o r m a t i o n  ab o u t  mi d d l e  sc h o o l s  is  pr o v i d e d  in  Ta b l e  4‐10 1 1 .      Ta b l e  4‐10 1 1   Mi d d l e  Sc h o o l s  Lo c a t e d  in  th e  Ci t y  of  Cu p e r t i n o   *E n r o l l m e n t  ca p a c i t y  is  eq u a l  to  th e  nu m b e r  of  cl a s s r o o m s  ti m e  21 . 7  st u d e n t s  pe r  ro o m ,  th e  av e r a g e  sh o w n  in  Table 4‐89 above.   27   Ta b l e  nu m b e r i n g   co r r e c t i o n  on l y   Ta b l e  4‐11 1 2   Cu r r e n t  En r o l l m e n t  Co m p a r e d  to  Ca p a c i t y   El e m e n t a r y  Sc h o o l s   Th e  At t e n d i n g  Di f f e r e n c e  co l u m n  of  th e  ta b l e  sh o w s  th a t  at t e n d a n c e  at  ea c h  of  th e  el e m e n t a r y  sc h o o l s  sh o w n  except Eaton exceeds the  ca p a c i t y  es t a b l i s h e d  in  Ta b l e  4‐89    ba s e d  on  th e  Di s t r i c t ’ s  st a n d a r d s .   28  ‐   29   CU S D  To t a l  st u d e n t s   by  al t e r n a t i v e    Th e  fo l l o w i n g  ta b l e ,  Ta b l e  4‐12 1 3 ,  th u s  sh o w s  th e  ca p a c i t i e s  ca l c u l a t e d  in  Ta b l e  4‐91 0  an d  co m p a r e s  th e m  wi t h  the projected enrollment  fo r  ea c h  Cu p e r t i n o  sc h o o l  fr o m  bo t h  ne w  un i t s  an d  to t a l  un i t s ,  ex i s t i n g  an d  ne w .      Ta b l e  4‐12 1 3   En r o l l m e n t  Ca p a c i t y  Co m p a r e d  to  En r o l l m e n t  by  Sc h o o l  At t e n d a n c e  Ar e a s   fr o m  Ne w  Un i t s  in  th e  Ci t y  of  Cu p e r t i n o  an d  Ex i s t i n g  Un i t s        En r o l l m e n t   En r o l l m e n t  By  20 2 3   En r o l l m e n t  Total    Ca p a c i t y   Fr o m  Ne w    To t a l   Fr o m  Ne w  Total  Di s t r i c t  To t a l *            Ex i s t i n g  Co n d i t i o n s   14 , 4 1 4   28 5   11 , 8 9 7   46 1   12,073  A ‐   Mi n i m a l  Gr o w t h    28 5   11 , 8 9 7   46 1   12,073  B ‐   Mo d e r a t e  Gr o w t h    26 5   11 , 8 7 7   74 2 7 4 3   12,35412,355  C ‐   Mo s t  Gr o w t h    49 8   12 , 1 1 0   89 9 9 0 1   12,51112,512  * To t a l s  do  no t  in c l u d e  en r o l l m e n t  fr o m  ne w  un i t s  ou t s i d e  of  th e  Ci t y  of  Cu p e r t i n o ,  ab o u t  62  st u d e n t s .                                                                    So u r c e s :  Ci t y  of  Cu p e r t i n o ,  En r o l l m e n t  Pr o j e c t i o n  Co n s u l t a n t s ,  an d  Sc h o o l h o u s e  Se r v i c e s     30   Ta b l e  nu m b e r i n g   on l y   Ta b l e  4‐12 1 3 ,  wh i c h  co m p a r e s  en r o l l m e n t  ca p a c i t i e s  wi t h  pr o j e c t e d  en r o l l m e n t s ,  pr o v i d e s  so m e  ev i d e n c e  wh y  the schools in the  no r t h e a s t  ar e  th e  mo s t  st r e s s e d .   31   Ta b l e  nu m b e r i n g   co r r e c t i o n  on l y   In f o r m a t i o n  re g a r d i n g  th e  co m p a r i s o n  of  cu r r e n t  en r o l l m e n t  wi t h  ca p a c i t y  fo r  th e  mi d d l e  sc h o o l s  is  sh o w n  in  Ta b l e  4‐1314 below.    Ta b l e  4‐13 1 4   14 1 0   No v e m b e r  3, 2014 | Page 42  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e Mi d d l e  Sc h o o l s  Lo c a t e d  in  th e  Ci t y  of  Cu p e r t i n o   32   CU S D  to t a l  st u d e n t s   by  al t e r n a t i v e    Ta b l e  4‐14 1 5   En r o l l m e n t  Ca p a c i t y  Co m p a r e d  to  En r o l l m e n t  by  Sc h o o l  At t e n d a n c e  Ar e a s   fr o m  Ne w  Un i t s  in  th e  Ci t y  of  Cu p e r t i n o  an d  Ex i s t i n g  Un i t s           En r o l l m e n t   En r o l l m e n t  By  20 2 3   Enrollment Total    Ca p a c i t y   Fr o m  Ne w    To t a l   Fr o m  New Total  *D i s t r i c t  To t a l            Ex i s t i n g  Co n d i t i o n s   4, 8 9 8   80   6, 3 8 8   12 9  6,437  A ‐   Mi n i m a l  Gr o w t h    80   6, 3 8 8   12 9  6,437  B ‐   Mo d e r a t e  Gr o w t h    74   6, 3 8 2   20 8 2 0 9  6,5166,517  C ‐   Mo s t  Gr o w t h    14 0   6, 4 4 8   25 2 2 5 3  6,5606,561  *T o t a l s  do  no t  in c l u d e  en r o l l m e n t  fr o m  ne w  un i t s  ou t s i d e  of  th e  Ci t y  of  Cu p e r t i n o ,  ab o u t  62  st u d e n t s ,  and         students who  do  no t  re s i d e d  in  th e  Di s t r i c t ,  ab o u t  12 0  st u d e n t s .    So u r c e s :  Ci t y  of  Cu p e r t i n o ,  En r o l l m e n t  Pr o j e c t i o n  Co n s u l t a n t s ,  an d  Sc h o o l h o u s e  Se r v i c e s     34   Ta b l e  nu m b e r i n g   co r r e c t i o n  on l y   Ta b l e  4‐15 1 6  be l o w  su m m a r i z e s  th e  es t i m a t e d  fa c i l i t i e s  co s t s  in  Ge n e r a l  Pl a n  Al t e r n a t i v e s  A‐C ba s e d  on  th e  es t i m a t e d  increase in the  nu m b e r  of  st u d e n t s .     Ta b l e  4‐15 1 6   Ca m p u s  Si z e s  Co m p a r e d  to  St a t e  St a n d a r d s   14 1 1   No v e m b e r  3, 2014 | Page 43  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 36 ‐  37   CU S D  to t a l  st u d e n t   an d  co s t s  by   al t e r n a t i v e   Ta b l e  4‐16 1 7   Pe r  St u d e n t  an d  pe r  Al t e r n a t i v e  Ca p i t a l  Co s t s  of  Ad d i t i o n a l  Ca p a c i t y  ‐   CU S D     St u d e n t s   by  20 2 3   Co s t s   (i n  mi l l i o n s )   To t a l   St u d e n t s   Costs (in millions)  El e m e n t a r y  Sc h o o l          Ex i s t i n g  Co n d i t i o n s   28 5   $8 . 4 9   46 1   $13.73  A ‐   Mi n i m a l  Gr o w t h   28 5   $8 . 4 9   46 1   $13.73  B ‐   Mo d e r a t e  Gr o w t h   26 5   $7 . 8 9   74 2 7 4 9   $22.10$22.31  C ‐   Mo s t  Gr o w t h   49 8   $1 4 . 8 3   89 9 9 0 1   $26.77$26.83  Mi d d l e  Sc h o o l          Ex i s t i n g  Co n d i t i o n s   80   $2 . 6 1   12 9   $4.21  A ‐   Mi n i m a l  Gr o w t h   80   $2 . 6 1   12 9   $4.21  B ‐   Mo d e r a t e  Gr o w t h   74   $2 . 4 2   20 8 2 0 9   $6.79$6.82  C ‐   Mo s t  Gr o w t h   14 0   $4 . 5 7    25 2 2 5 3   $8.23$8.26  CU S D  To t a l          Ex i s t i n g  Co n d i t i o n s   36 5   $1 1 . 1 0   59 0   $17.94  A ‐   Mi n i m a l  Gr o w t h   36 5   $1 1 . 1 0   59 0   $17.94  B ‐   Mo d e r a t e  Gr o w t h   33 9   $1 0 . 3 1   95 0 9 5 2   $28.89$29.13  C ‐   Mo s t  Gr o w t h   63 8   $1 9 . 4 0   1, 1 5 1 1 , 1 5 4   $35.00$35.09  So u r c e :    Sc h o o l h o u s e  Se r v i c e s     38   CU S D  to t a l  fe e s  by   al t e r n a t i v e     Ta b l e  4‐17 1 8   De v e l o p m e n t  Im p a c t  Fe e  Re v e n u e  ‐   CU S D     Un i t s   by  20 2 3   Fe e  Re v e n u e   (i n  mi l l i o n s )   To t a l   Un i t s   Fee Revenue (in millions)  Ex i s t i n g  Co n d i t i o n s   1, 1 4 0   $2 . 3 4   1, 8 4 5   $3.79  A ‐   Mi n i m a l  Gr o w t h   1, 1 4 0   $2 . 3 4   1, 8 4 5   $3.79  B ‐   Mo d e r a t e  Gr o w t h   1, 0 6 0   $2 . 1 8   2, 9 6 6 2 , 9 7 2   $6.10 $6.11  C ‐   Mo s t  Gr o w t h   1, 9 9 3   $4 . 1 0   3, 5 9 6 3 , 6 0 1   $7.39 $7.40  So u r c e :    Sc h o o l h o u s e  Se r v i c e s   14 1 2   No v e m b e r  3, 2014 | Page 44  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 38  ‐   39   CU S D  to t a l   fe e s / c o s t s  by   al t e r n a t i v e   Ta b l e  4‐18 1 9  sh o w s  th e  ca l c u l a t i o n  of  th e  di f f e r e n c e  be t w e e n  th e  co s t s  in c u r r e d  an d  th e  de v e l o p m e n t  im p a c t  fe e s  likely to be generated  by  th e  de v e l o p m e n t  al l o w e d  un d e r  ea c h  al t e r n a t i v e .         Ta b l e  4‐18 1 9   De v e l o p m e n t  Im p a c t  Fe e  Re v e n u e  Ve r s u s  Fa c i l i t i e s  Co s t s  (i n  $ mi l l i o n s )  ‐   CU S D *     Un i t s  by  20 2 3   To t a l  Un i t s     Co s t   Re v e n u e   De f i c i t   Co s t   Re v e n u e   Deficit  Ex i s t i n g  Co n d i t i o n s   $1 1 . 1 0   $2 . 3 4   $8 . 7 6   $1 7 . 9 4   $3 . 7 9    $14.15  A ‐   Mi n i m a l  Gr o w t h   $1 1 . 1 0   $2 . 3 4   $8 . 7 6   $1 7 . 9 4   $3 . 7 9    $14.15  B ‐   Mo d e r a t e  Gr o w t h   $1 0 . 3 1   $2 . 1 8   $8 . 1 3   $2 8 . 8 9   $6 . 1 0  $6 . 1 1    $22.79$22.78  C ‐   Mo s t  Gr o w t h   $1 9 . 4 0   $4 . 1 0   $1 5 . 3 1   $3 5 . 0 0   $7 . 3 9 $ 7 . 4 0   $27.61$27.60  * Bo t h  fe e  re v e n u e  an d  fa c i l i t i e s  co s t s  ar e  on e ‐ti m e ,  ra t h e r  th a n  an n u a l ,  es t i m a t e s . So u r c e :    Sc h o o l h o u s e  Se r v i c e s     39   Ta b l e  nu m b e r i n g   co r r e c t i o n  on l y   Th e r e f o r e ,  th e  co s t  pe r  st u d e n t  es t i m a t e  is  si m p l y  a ca l c u l a t i o n  of  th e  op e r a t i n g  ex p e n d i t u r e s  di v i d e d  by  th e  nu m b e r  of students, as shown  in  Ta b l e  4‐19 2 0 .     Ta b l e  4‐19 2 0   Op e r a t i n g  Co s t s  ‐   CU S D   43   FH U S D  to t a l  ho u s i n g   un i t s  by  al t e r n a t i v e   Ta b l e  5‐1  Ne w  Ci t y  of  Cu p e r t i n o  Ho u s i n g  Un i t s  ‐   FU H S D                                  Al t e r n a t i v e s   Ex i s t i n g   Co n d i t i o n s   Mi n i m a l  Gr o w t h   A  Mo d e r a t e  Gr o w t h   B  Most Growth C            By  20 2 3   1, 1 4 0   1, 1 4 0   1, 0 6 0   1,993  To t a l  Al l o w e d  in  FU H S D   1, 8 4 5   1, 8 4 5   2, 9 6 6 2 , 9 7 2   3,5963,601  To t a l  in  Ci t y  of  Cu p e r t i n o   1, 8 9 5   1, 8 9 5   3, 3 1 6   4,421  So u r c e :  Ci t y  of  Cu p e r t i n o   14 1 3   No v e m b e r  3, 2014 | Page 45  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 44   FH U S D  to t a l   st u d e n t s  un i t s  by   al t e r n a t i v e   Ta b l e  5‐2  En r o l l m e n t  fr o m  Ne w  Un i t s *  ‐   FU H S D     Al t e r n a t i v e s         SG R s   Ex i s t i n g   Co n d i t i o n s   Mi n i m a l   Gr o w t h   A  Mo d e r a t e   Gr o w t h   B  Most Growth C          By  20 2 3         Hi g h  sc h o o l  (g r a d e s  9‐12 )   0. 0 7   80   80   74   140          Fr o m  To t a l  Un i t s  Al l o w e d            Hi g h  sc h o o l  (g r a d e s  9‐12 )   0. 0 7   12 9   12 9   20 8 2 0 9   252253  *I n  th e  Cu p e r t i n o  Un i o n  Sc h o o l  Di s t r i c t   So u r c e s :  En r o l l m e n t  Pr o j e c t i o n  Co n s u l t a n t s  an d  Ci t y  of  Cu p e r t i n o     45   FH U S D  to t a l  ho u s i n g   un i t s  by  al t e r n a t i v e   Ta b l e  5‐3  En r o l l m e n t  by  Sc h o o l  At t e n d a n c e  Ar e a s  ‐   FU H S D   Ne w  Ho u s i n g  Un i t s  in  th e  Ci t y  of  Cu p e r t i n o        By  20 2 3   To t a l     Un i t s   En r o l l m e n t   Un i t s   Enrollment  Di s t r i c t  To t a l Ex i s t i n g  Co n d i t i o n s 1, 1 4 0 80 1, 8 4 5 129 A ‐ Mi n i m a l  Gr o w t h 1, 1 4 0 80 1, 8 4 5 129 B ‐ Mo d e r a t e  Gr o w t h 1, 0 6 0 74 2, 9 6 6 2 , 9 7 2 208209 C ‐ Mo s t  Gr o w t h 1, 9 9 3 14 0 3, 5 9 6 3 , 6 0 1 252253 *E n r o l l m e n t  ca p a c i t y  is  eq u a l  to  th e  nu m b e r  of  cl a s s r o o m s  ti m e s  th e  av e r a g e  st u d e n t  ge n e r a t i o n  rate of  re c e n t  pr o j e c t s .    Th e  to t a l s  ar e  no t  al w a y s  ex a c t l y  th e  nu m b e r s  in  th e  pr i o r  ta b l e  du e  to  ro u n d i n g .   So u r c e s :  Ci t y  of  Cu p e r t i n o  an d  Sc h o o l h o u s e  Se r v i c e s     14 1 4   No v e m b e r  3, 2014 | Page 46  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 51   FH U S D  to t a l  co s t s   by  al t e r n a t i v e   Ta b l e  5‐8  Co s t s  of  Ad d i t i o n a l  Ca p a c i t y  pe r  Al t e r n a t i v e  ‐   FU H S D     St u d e n t s   by  20 2 3   Co s t s   (i n  mi l l i o n s )   To t a l  St u d e n t s   Costs  (i n  millions)                   Ex i s t i n g  Co n d i t i o n s   80   $5 . 5 7   12 9   $8.98  A ‐   Mi n i m a l  Gr o w t h   80   $5 . 5 7   12 9   $8.98  B ‐   Mo d e r a t e  Gr o w t h   74   $5 . 1 5   20 8 2 0 9   $1 4 . 4 8 $ 1 4 . 5 5   C ‐   Mo s t  Gr o w t h   14 0   $9 . 7 5   25 2 2 5 3   $1 7 . 5 5 $ 1 7 . 6 1   So u r c e :    Sc h o o l h o u s e  Se r v i c e s                                                                      52   FH U S D  to t a l  fe e s  by   al t e r n a t i v e     Ta b l e  5‐9  De v e l o p m e n t  Im p a c t  Fe e  Re v e n u e  – FU H S D     Un i t s   by  20 2 3   Re v e n u e s   (i n  mi l l i o n s )   To t a l   Un i t s   Revenues  (i n  millions)  Ex i s t i n g  Co n d i t i o n s   1, 1 4 0   $1 . 5 5   1, 8 4 5   $2.51   A ‐   Mi n i m a l  Gr o w t h   1, 1 4 0   $1 . 5 5   1, 8 4 5   $2.51  B ‐   Mo d e r a t e  Gr o w t h   1, 0 6 0   $1 . 4 4   2, 9 6 6 2 , 9 7 6   $4.04$4.06  C ‐   Mo s t  Gr o w t h   1, 9 9 3   $2 . 7 2   3, 5 9 6 3 , 6 0 1   $4.90$4.91  So u r c e :    Sc h o o l h o u s e  Se r v i c e s     14 1 5   No v e m b e r  3, 2014 | Page 47  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 53   FH U S D  to t a l   fe e s / c o s t s  by   al t e r n a t i v e     Ta b l e  5‐10   De v e l o p m e n t  Im p a c t  Fe e s  Ve r s u s  Fa c i l i t i e s  Co s t s  (i n  $ mi l l i o n s )  ‐   FU H S D *       Un i t s  by  20 2 3   To t a l  Un i t s     Co s t   Re v e n u e   Ne t  Co s t   Co s t   Re v e n u e   Net Cost  Ex i s t i n g  Co n d i t i o n s   $5 . 5 7   $1 . 5 5   $4 . 0 2   $8 . 9 8   $2 . 5 1    $6.47  A ‐   Mi n i m a l  Gr o w t h   $5 . 5 7   $1 . 5 5   $4 . 0 2   $8 . 9 8   $2 . 5 1    $6.47  B ‐   Mo d e r a t e  Gr o w t h   $5 . 1 5   $1 . 4 4   $3 . 7 1   $1 4 . 4 8 $ 1 4 . 5 5   $4 . 0 4  $4 . 0 6   $10.44$10.49  C ‐   Mo s t  Gr o w t h   $9 . 7 5   $2 . 7 2   $7 . 0 3   $1 7 . 5 5 $ 1 7 . 6 1   $4 . 9 0  $4 . 9 1   $12.65$12.70  * Bo t h  fe e  re v e n u e  an d  fa c i l i t i e s  co s t s  ar e  on e ‐ti m e ,  ra t h e r  th a n  an n u a l ,  es t i m a t e s .      So u r c e :    Sc h o o l h o u s e  Se r v i c e s     53   FH U S D  to t a l  co s t s   by  al t e r n a t i v e   Ta b l e  5‐12   An n u a l  Op e r a t i n g  Co s t s  – FU H S D     Un i t s   by  20 2 3   Co s t s   (i n  mi l l i o n s )   To t a l   Un i t s   Costs (in millions)  Ex i s t i n g  Co n d i t i o n s   80   $0 . 8 6   12 9   $1.39  A ‐   Mi n i m a l  Gr o w t h   80   $0 . 8 6   12 9   $1.39  B ‐   Mo d e r a t e  Gr o w t h   74   $0 . 8 0   20 8 2 0 9   $2.25$2.26  C ‐   Mo s t  Gr o w t h   14 0   $1 . 5 1   25 2 2 5 3   $2.72$2.73  So u r c e :    Sc h o o l h o u s e  Se r v i c e s     14 1 6   No v e m b e r  3, 2014 | Page 48  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 54   FH U S D  to t a l  ta x e s   by  al t e r n a t i v e     Ta b l e  5‐13   Pr o p e r t y  Ta x  Re v e n u e s  ‐   FU H S D     Un i t s   by  20 2 3   Re v e n u e   (i n  mi l l i o n s )   To t a l   Un i t s   Revenue (in millions)  Ex i s t i n g  Co n d i t i o n s   1, 1 4 0   $1 . 1 6   1, 8 4 5   $1.88   A ‐   Mi n i m a l  Gr o w t h   1, 1 4 0   $1 . 1 6   1, 8 4 5   $1.88  B ‐   Mo d e r a t e  Gr o w t h   1, 0 6 0   $1 . 0 8   2, 9 6 6 2 , 9 7 2   $3.03  C ‐   Mo s t  Gr o w t h   1, 9 9 3   $2 . 0 3   3, 5 9 6 3 , 6 0 1   $3.67  So u r c e :    Sc h o o l h o u s e  Se r v i c e s                                                                        55   FH U S D  to t a l  co s t s   by  al t e r n a t i v e   Ta b l e  5‐15   To t a l  An n u a l  Op e r a t i n g  Re v e n u e s  ve r s u s  Co s t s  (i n  Mi l l i o n s )  – FU H S D     Un i t s  by  20 2 3   To t a l  Un i t s     Re v e n u e   Co s t s   Ne t   Re v e n u e   Co s t s   Net  Ex i s t i n g  Co n d i t i o n s   $1 . 3 3   $0 . 8 6   $0 . 4 7   $2 . 1 6   $1 . 3 9   $0.77  A ‐   Mi n i m a l  Gr o w t h   $1 . 3 3   $0 . 8 6   $0 . 4 7   $2 . 1 6   $1 . 3 9   $0.77  B ‐   Mo d e r a t e  Gr o w t h   $1 . 2 4   $0 . 8 0   $0 . 4 4   $3 . 4 8   $2 . 2 5 $ 2 . 2 6   $1.23$1.22  C ‐   Mo s t  Gr o w t h   $2 . 3 4   $1 . 5 1   $0 . 8 3   $4 . 2 1   $2 . 7 2 $ 2 . 7 3   $1.49$1.48  So u r c e :    Sc h o o l h o u s e  Se r v i c e s                                           Ch a p t e r  2:  Ex e c u t i v e  Su m m a r y  of  th e  Re s p o n s e  To  Co m m e n t  Do c u m e n t 2‐4  Su m m a r y  of   Pr o p o s e d  Pr o j e c t   Th e  Ci t y  of  Cu p e r t i n o  ha s  un d e r t a k e n  a co m m u n i t y ‐ba s e d  pl a n n i n g  pr o c e s s  to  re v i e w  la n d  us e  al t e r n a t i v e s  as  pa r t  of a focused General  Pl a n  Am e n d m e n t .  Pr o p o s e d  al t e r n a t i v e s  in c l u d e  op t i o n s  fo r  ci t y ‐wi d e  de v e l o p m e n t  al l o c a t i o n s  (o f f i c e ,  co m m e r c i a l ,  hotel, and residential),  as  we l l  as  bu i l d i n g  he i g h t s  an d  de n s i t i e s  fo r  Sp e c i a l  Ar e a s  al o n g  ma j o r  tr a n s p o r t a t i o n  co r r i d o r s ,  wh e r e  Ga t e w a y s / N o d e s  have been  id e n t i f i e d ,  se v e n  St u d y  Ar e a s ,  an d  Ot h e r  Sp e c i a l  Ar e a s  in c l u d i n g  Re s i d e n t i a l  an d  No n ‐Re s i d e n t i a l / M i x e d ‐Us e  Sp e c i a l  Areas. These Project  Co m p o n e n t  lo c a t i o n s  ar e  sh o w n  in  Ch a p t e r  3,  Pr o j e c t  De s c r i p t i o n ,  of  th i s  Dr a f t  EI R  on  Fi g u r e s  3‐43 ‐5,  3‐10 3 ‐11  and 3‐19, respectively. The  pr o p o s e d  la n d  us e  al t e r n a t i v e s  an d  ch a n g e s  to  th e  go a l s ,  po l i c i e s  an d  st r a t e g i e s  wo u l d  re q u i r e  am e n d m e n t s  to  the City of Cupertino 2000‐ 14 1 7   No v e m b e r  3, 2014 | Page 49  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 20 2 0  Ge n e r a l  Pl a n  ad o p t e d  by  th e  Ci t y  Co u n c i l  on  No v e m b e r  15 ,  20 0 5 .   2‐6  Al t e r n a t i v e s  to  th e   Pr o p o s e d  Pr o j e c t    Ta b l e  2‐1  Al t e r n a t i v e s  De v e l o p m e n t  Al l o c a t i o n s  Co m p a r i s o n  Su m m a r y   Ca t e g o r y   Pr o p o s e d    Pr o j e c t a  No    Pr o j e c t b  La n d  Us e    Al t e r n a t i v e  A  Land Use  Alternative B  Of f i c e   4, 0 4 0 , 2 3 1  sf   54 0 , 2 3 1  sf   1, 0 4 0 , 2 3 1  sf   2,540,231 sf  Co m m e r c i a l   1, 3 4 3 , 6 7 9  sf c  70 1 , 4 1 3  sf   70 1 , 4 1 3  sf   1,343,679 sfc  Ho t e l   1, 3 3 9  ro o m s   33 9  ro o m s   60 0  ro o m s   839 rooms  Re s i d e n t i a l   4, 4 2 1  un i t s   1, 8 9 5  un i t s   1, 8 9 5  un i t s   3,316 units  No t e :  sf  = sq u a r e  fe e t   a.  Th e  pr o p o s e d  Pr o j e c t  re p r e s e n t s  Ge n e r a l  Pl a n  La n d  Us e  Al t e r n a t i v e  C.   b.  No  Pr o j e c t  re p r e s e n t s  re m a i n i n g  de v e l o p m e n t  al l o c a t i o n  un d e r  th e  ex i s t i n g  20 0 5  Ge n e r a l  Pl a n .   c.  Re f l e c t s  th e  re d e v e l o p m e n t  of  Va l l c o  Ma l l  (1 , 2 6 7 , 6 0 1  sf )  wi t h  62 5 , 3 3 5  sf  re s e r v e d  fo r  th e  Va l l c o  Ma l l  an d  th e  re m a i n i n g  64 2 , 2 6 6  sf  re a l l o c a t e d  to other areas in  th e Ci t y .  Du e  to  th e  hi g h  va c a n c y  ra t e  at  th e  Va l l c o  Sh o p p i n g  Ma l l  un d e r  ex i s t i n g  co n d i t i o n s ,  th i s  EI R  pr o v i d e s  a co n s e r v a t i v e  an a l y s i s  fo r  th e  to t a l  commercial  de v e l o p m e n t  al l o c a t i o n  of  1, 3 4 3 , 6 7 9  sq u a r e  fe e t  (i . e .  64 2 , 2 6 6  sq u a r e  fe e t  + 70 1 , 4 1 3  sq u a r e  fe e t )  du r i n g  th e  pl a n n i n g  pe r i o d  un d e r  th e  pr o p o s e d  Project and  Al t e r n a t i v e  B.   So u r c e :  Ci t y  of  Cu p e r t i n o .   14 1 8   No v e m b e r  3, 2014 | Page 50  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 2‐12 ,  2‐16   an d  2‐26   Su m m a r y  of  Im p a c t s   an d  Mi t i g a t i o n   Me a s u r e s     Ta b l e  2‐2 Su m m a r y  of  Im p a c t s  an d  Mi t i g a t i o n  Me a s u r e s   BI O ‐6:  Im p l e m e n t a t i o n  of  th e  No  pr o p o s e d  Pr o j e c t   al t e r n a t i v e ,  in  co m b i n a t i o n  wi t h  pa s t ,  pr e s e n t ,  an d   re a s o n a b l y  fo r e s e e a b l e  pr o j e c t s ,  wo u l d  no t  re s u l t  in   si g n i f i c a n t  cu m u l a t i v e  im p a c t s  wi t h  re s p e c t  to  bi o l o g i c a l   re s o u r c e s .   LT S   Se e  Mi t i g a t i o n  Me a s u r e  BI O ‐1.   LTS/M  HA Z ‐7:  Im p l e m e n t a t i o n  of  th e  pr o p o s e d  Pr o j e c t ,  in   co m b i n a t i o n  wi t h  pa s t ,  pr e s e n t ,  an d  re a s o n a b l y   fo r e s e e a b l e  pr o j e c t s ,  wo u l d  re s u l t  in  le s s  th a n  si g n i f i c a n t   cu m u l a t i v e  im p a c t s  wi t h  re s p e c t  to  ha z a r d s  an d  ha z a r d o u s   ma t e r i a l s .   LT S   Se e  Mi t i g a t i o n  Me a s u r e  HA Z ‐4a  an d  HA Z ‐4b. LTS/M  UT I L ‐7:  Im p l e m e n t a t i o n  of  th e  pr o p o s e d  Pr o j e c t ,  in   co m b i n a t i o n  wi t h  pa s t ,  pr e s e n t ,  an d  re a s o n a b l y   fo r e s e e a b l e  pr o j e c t s ,  wo u l d  no t  re s u l t  in  a si g n i f i c a n t   cu m u l a t i v e  im p a c t s  wi t h  re s p e c t  to  wa s t e w a t e r  tr e a t m e n t .   LT S   Se e  Mi t i g a t i o n  Me a s u r e s  UT I L ‐6a ,  UT I L ‐6b, and  UT I L ‐6c .   LTS/M  UT I L ‐10 :  Im p l e m e n t a t i o n  of  th e  pr o p o s e d  Pr o j e c t ,  in   co m b i n a t i o n  wi t h  pa s t ,  pr e s e n t ,  an d  re a s o n a b l y   fo r e s e e a b l e  pr o j e c t s ,  wo u l d  re s u l t  in  si g n i f i c a n t  cu m u l a t i v e   im p a c t s  wi t h  re s p e c t  to  so l i d  wa s t e .   LT S   N/ A  Se e  Mi t i g a t i o n  Me a s u r e    UT I L ‐8.   N/ALTS/M  S = Si g n i f i c a n t  LT S  = Le s s  th a n  Si g n i f i c a n t  SU  = Si g n i f i c a n t  an d  Un a v o i d a b l e  LT S / M  = Le s s  th a n  Si g n i f i c a n t / M i t i g a t i o n       Ch a p t e r  3:  Re v i s i o n s  to  th e  Dr a f t  EI R  of  th e  Re s p o n s e  to  Co m m e n t  Do c u m e n t 3‐2 of  th e   Fi n a l  EI R   (R e v i s i o n s   Ch a p t e r )   Ho u s i n g  El e m e n t   Si t e  5  Th e  la s t  pa r a g r a p h  un d e r  su b h e a d i n g  Pr o p o s e d  Pr o j e c t  wi t h  re s p e c t  to  Ho u s i n g  El e m e n t  Si t e  5 (G l e n b r o o k  Ap a r t m e n t s )  on page 3‐80 of  th e  Dr a f t  EI R  is  he r e b y  am e n d e d  as  fo l l o w s :   Un d e r  th e  pr o p o s e d  Pr o j e c t ,  th e r e  wo u l d  be  no  ch a n g e s  to  th e  Ge n e r a l  Pl a n  la n d  us e  de s i g n a t i o n ,  zo n i n g ,  or  de n s i t y .  As shown in Table 3‐ 21 ,  fu t u r e  de v e l o p m e n t  un d e r  th e  pr o p o s e d  Pr o j e c t  co u l d  re s u l t  in  up  to  93  ne w  re s i d e n t i a l  un i t s  ad d e d  to  th e  existing 517 units, for a  to t a l  of  53 0 6 1 0  un i t s .    14 1 9   No v e m b e r  3, 2014 | Page 51  Ta b l e  1:  Su p p l e m e n t a l  Te x t  Re v i s i o n s  to  th e  Fi n a l  EI R   Pa g e  No .   Is s u e / T o p i c   Re v i s e d  Te x t / C h a n g e 3‐6 of  th e   Fi n a l  EI R   (R e v i s i o n s   Ch a p t e r )   Ho u s i n g  El e m e n t   Si t e  6  Th e  la s t  pa r a g r a p h  un d e r  su b h e a d i n g  Pr o p o s e d  Pr o j e c t  wi t h  re s p e c t  to  Ho u s i n g  El e m e n t  Si t e  6 (T h e  Vi l l a g e s  Ap a r t m e n t s )  on page 3‐82 of  th e  Dr a f t  EI R  is  he r e b y  am e n d e d  as  fo l l o w s :   Un d e r  th e  pr o p o s e d  Pr o j e c t ,  th e r e  wo u l d  be  no  ch a n g e s  to  th e  Ge n e r a l  Pl a n  la n d  us e  de s i g n a t i o n ,  zo n i n g ,  or  de n s i t y .  As shown in Table 3‐ 21 ,  fu t u r e  de v e l o p m e n t  un d e r  th e  pr o p o s e d  Pr o j e c t  co u l d  re s u l t  in  up  to  62  ne t  re s i d e n t i a l  un i t s  ad d e d  to  th e  ex i s t i n g  468 units, for a total  of  61 0 5 3 0  un i t s .        14 2 0 !(!( !(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!( !(!(!( !(!(!(!(!(!(!(!( !(!(!(!(!(!( !(!(!( !(!(!(!(!(!( !(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!( !(!( !(!(!(!(!(!(!( !(!( !( !(!(!(!( !(!(!(!( City of San Jose Correction: Removed from the South De Anza Mixed-Use Special Area, APN 359-18-028 S D E A N Z A B L V D BOLLI N G E R R D MCCLELLAN RD SCOFIELD DR ")2 Jollyman Park Cali Mill Plaza Library Field Faria Elementary School !( !( !( !( City of San Jose |ÿ85 City of Saratoga PROSPECT RD S D E A N Z A B L V D RAINBOW DR Three Oaks Park Hoover Park !(16 City of San Jose |ÿ85 City of San Jose |ÿ85 PROJECT DESCRIPTIONCITY OF CUPERTINOGENERAL PLAN AMENDMENT, HOUSING ELEMENT UPDATE, AND ASSOCIATED REZONING PROJECT Figure 3-10Proposed South De Anza Special Area Source: City of Cupertino, 2013; MIG, Inc, 2014; PlaceWorks, 2014. 0 500 1,000250 Feet Maximum Residential Density25 dwelling units per acre40 dwelling units per acreMixed-Use Special AreasStudy AreasHousing Element Sites !(Bus StopsParksCity Boundary 3 3 1421 City of Sunnyvale %&'(280 |ÿ85 City of San Jose City of Los Altos |ÿ85 City of Sunnyvale City of Santa Clara Santa Clara County !(47 65-70 73-89 71-72 31-36 !(46 61-64 56-59 51-5548-49 90-93 !(94!(96 !(95 !(97 !(98 !(41 !(43 !(13 !(19 !(4 !(39 !(22 !(9!(10 !(27 !(14 !(16 !(37 !(11 !(12 !(25 !(17 !(18 !(26 !(44 !(42 !(23 !(38 !(30 !(20 !(3 !(15 !(2 !(28 !(45 !(40 !(24 !(21 !(29 !(6 !(5 !(7 !(1 !(8 !(50 !(60 STEVENS CREEK BLVD S B L A N E Y A V E N B L A N E Y A V E N S T E L L I N G R D BUB BRD N TANTAU AVE S D E A N Z A B L V D BOLLINGER RD BLANEYAVE PRUNERIDGE AVE FO O T H I L L B L V D N FOOTHILL BLVD S S T E L L I N G R D HOMESTEAD RD M I L L E R A V E S TANTAUAVE N D E A N Z A B L V D MCCLELLAN RD N W O L F E R D Monta Vista Recreation Center/Park Linda Vista Park Deep Cliff Golf Course McClellan Ranch Preserve Blackberry Farm Park Somerset Square Park Varian Park Memorial Park Three Oaks Park Jollyman Park Cali Mill Plaza Library Field Wilson Park Creekside Park Portal Park Franco Park PROJECT DESCRIPTIONCITY OF CUPERTINOGENERAL PLAN AMENDMENT, HOUSING ELEMENT UPDATE, AND ASSOCIATED REZONING PROJECT Figure 3-40General Plan and Zoning Ordinance Conformance Sites Source: City of Cupertino, 2013; MIG, Inc, 2014; PlaceWorks, 2014. 0 0.25 0.50.125 Miles 1422 1423     MEMORANDUM DATE November 3 , 2014  TO Piu Ghosh, City of Cupertino   FROM Steve Noack, PlaceWorks  SUBJECT General Plan Amendment, Housing Element Update, and Associated Rezoning Draft  Environmental Impact Report (EIR) – Updated Late Comments Received after the 45‐Day  Comment Period  Table 1, below, lists and provides a brief response to written comments that were received by the City  after the close of the public comment period for the General Plan Amendment, Housing Element  Update, and Associated Rezoning Draft EIR. The 45‐day public comment period ended on August 1,  2014. This memo responds to comments received between August 2 through November 3, 2014.1   These comments are reproduced at the end of this memo. No other late comments on the Draft EIR  have been received as of the date of this memo.  These comments do not contain “significant new information,” as defined in the California  Environmental Quality Act Guidelines Section 15088.5, which includes new or substantially more  severe environmental impacts, new mitigation measures or alternatives, or information indicating that  the Draft EIR is fundamentally or basically inadequate. No revisions need to be made to the Draft EIR.  1 This memo updates our October 14, 2014 memo that addressed late comments received  through November 3, 2014.  1424    No v e m b e r  3, 2014 | Page 2   TAB L E    1:    LAT E  COM M E N T S    AN D  RES P O N S E S   T y p e 1 N u m b e r 2 N a m e Da t e R e c e i v e d T o p i c Re s p o n s e 3 1 B L C - 0 1 J o h n F r e y 8 / 8 / 2 0 1 4 T r a f f i c , E m e r g e n c y Re s p o n s e , S c h o o l s , Ae s t h e t i c s ( i n c r e a s e d he i g h t ) Im p a c t s t o t r a f f i c c o n g e s t i o n a r e d i s c u s s e d i n C h a p t e r 4 . 1 3 , Tr a n s p o r t a t i o n a n d T r a f f i c , o f t h e D r a f t E I R b e g i n n i n g o n p a g e 4 . 1 3 - 4 9 . Th e c u m u l a t i v e i m p a c t s a n a l y s i s i n t h e E I R a c c o u n t s f o r r e g i o n a l Gr o w t h . S e e D r a f t E I R , p p . 4 - 4 t o 4 - 5 . Im p a c t s t o f i r e p r o t e c t i o n s e r v i c e s , p o l i c e s e r v i c e s a n d s c h o o l s a r e di s c u s s e d i n C h a p t e r 4 . 1 2 , P u b l i c S e r v i c e s a n d R e c r e a t i o n , b e g i n n i n g on p a g e s 4 . 1 2 - 1 , 4 . 1 2 - 8 a n d 4 . 1 2 - 1 8 , r e s p e c t i v e l y . I m p a c t s t o p u b l i c se r v i c e p r o v i d e r s w e r e f o u n d t o b e l e s s t h a n s i g n i f i c a n t . Im p a c t s d u e t o i n c r e a s e d h e i g h t l i m i t s u n d e r t h e p r o p o s e d P r o j e c t a r e di s c u s s e d i n C h a p t e r 4 . 1 , A e s t h e t i c s , o f t h e D r a f t E I R . A s d i s c u s s e d i n Ch a p t e r 4 . 1 , i m p a c t s w e r e f o u n d t o b e l e s s t h a n s i g n i f i c a n t i n a l l a r e a s wh e r e p o t e n t i a l f u t u r e d e v e l o p m e n t i n v o l v i n g i n c r e a s e d h e i g h t i s b e i n g co n s i d e r e d . S e e R e s p o n s e t o C o m m e n t B 1 1 - 0 1 i n C h a p t e r 5 o f t h e Re s p o n s e t o C o m m e n t s D o c u m e n t . 2 B L C - 0 2 B a r b a r a R o g e r s 8 / 2 5 / 2 0 1 4 S e n i o r H o u s i n g , N o n - E I R re l a t e d Th e c o m m e n t i s a c k n o w l e d g e d . 3 B L C - 0 3 C a r l e n e M a t c h n i f f 9 / 9 / 2 0 1 4 N o n - E I R r e l a t e d Th e c o m m e n t i s a c k n o w l e d g e d . 4 B L C - 0 4 D a n W h i s e n h u n t 9 / 8 / 2 0 1 4 N o n - E I R r e l a t e d Th e c o m m e n t i s a c k n o w l e d g e d . P l e a s e s e e t h e r e s p o n s e s t o l e t t e r B - 16 i n t h e A u g u s t 2 8 , 2 0 1 4 R e s p o n s e t o C o m m e n t s D o c u m e n t . 5 B L C - 0 5 R u b y E l b o g e n 9 / 1 2 / 2 0 1 4 W a t e r s u p p l y , s c h o o l s I m p a c t s sc h o o l s a r e d i s c u s s e d i n C h a p t e r 4 . 1 2 , P u b l i c S e r v i c e s a n d Re c r e a t i o n , b e g i n n i n g o n p a g e 4 4 . 1 2 - 1 8 . I m p a c t s t o s c h o o l s w e r e fo u n d t o b e l e s s t h a n s i g n i f i c a n t . I m p a c t s t o w a t e r s u p p l y w e r e di s c u s s e d i n C h a p t e r 4 . 1 4 , U t i l i t i e s a n d S e r v i c e S y s t e m s , b e g i n n i n g o n pa g e 4 . 1 4 - 1 . W a t e r s u p p l y i m p a c t s w e r e f o u n d t o b e l e s s t h a n si g n i f i c a n t . 14 2 5   No v e m b e r  3, 2014 | Page 3  TAB L E    1:    LAT E  COM M E N T S    AN D  RES P O N S E S   T y p e 1 N u m b e r 2 N a m e Da t e R e c e i v e d T o p i c Re s p o n s e 3 6 B L C - 0 6 R u b y E l b o g e n 9 / 1 6 / 2 0 1 4 N o n - E I R r e l a t e d Th e c o m m e n t i s a c k n o w l e d g e d . 7 B L C - 0 7 S a b r i n a R i s k 9/ 1 6 / 2 0 1 4 N o n - E I R r e l a t e d Th e c o m m e n t i s a c k n o w l e d g e d . 8 B L C - 0 8 T r i s h M c A f e e 9/ 1 6 / 2 0 1 4 T r a f f i c Im p a c t s t o t r a f f i c c o n g e s t i o n a r e d i s c u s s e d i n C h a p t e r 4 . 1 3 , Tr a n s p o r t a t i o n a n d T r a f f i c , o f t h e D r a f t E I R b e g i n n i n g o n p a g e 4 . 1 3 - 4 9 . Th e c u m u l a t i v e i m p a c t s a n a l y s i s i n t h e E I R a c c o u n t s f o r r e g i o n a l gr o w t h . S e e D r a f t E I R , p p . 4 - 4 t o 4 - 5 . W i t h r e s p e c t t o p a r k i n g , f u t u r e de v e l o p m e n t w o u l d b e r e q u i r e d t o p r o v i d e s u f f i c i e n t p a r k i n g a s re q u i r e d i n T i t l e 1 9 , Z o n i n g , C h a p t e r 1 9 . 1 2 4 , P a r k i n g R e g u l a t i o n s o f th e M u n i c i p a l C o d e . 9 B L C - 0 9 S t e v e H i l l 9/ 1 6 / 2 0 1 4 T r a f f i c Im p a c t s t o a l l m o d e s o f t r a n s p o r t a t i o n a r e d i s c u s s e d i n C h a p t e r 4 . 1 3 , Tr a n s p o r t a t i o n a n d T r a f f i c , o f t h e D r a f t E I R b e g i n n i n g o n p a g e 4 . 1 3 - 4 9 . Th e c u m u l a t i v e i m p a c t s a n a l y s i s i n t h e E I R a c c o u n t s f o r r e g i o n a l gr o w t h . S e e D r a f t E I R , p p . 4 - 4 t o 4 - 5 . 10 B L C - 1 0 P h y l l i s D i c k s t e i n 1 0 / 6 / 2 0 1 4 G e n e r a l E I R , R e s p o n s e t o Co m m e n t s D o c u m e n t , Wa t e r S u p p l y , E I R P r o c e s s Im p a c t s t o w a t e r s u p p l y a r e d i s c u s s e d i n C h a p t e r 4 . 1 4 , U t i l i t i e s a n d Se r v i c e S y s t e m s , b e g i n n i n g o n p a g e 4 . 1 4 - 1 3 . T h e c u m u l a t i v e i m p a c t s an a l y s i s i n t h e E I R a c c o u n t s f o r r e g i o n a l g r o w t h . S e e D r a f t E I R , p a g e s 4- 4 t o 4 - 5 . W a t e r s u p p l y i m p a c t s w e r e f o u n d t o b e l e s s t h a n s i g n i f i c a n t . 11 B L C - 1 1 K a i W e t l e s e n 10 / 6 / 2 0 1 4 T r a f f i c Th e c o m m e n t i s a c k n o w l e d g e d . T a b l e 4 . 1 3 - 1 5 i s e d i t e d t o i n c l u d e t h e re v i s i o n s m e n t i o n e d . 12 A L C - 1 2 M a r k A l l g i r e , S a n t a C l a r a Un i f i e d S c h o o l D i s t r i c t 10 / 9 / 2 0 1 4 A i r Q u a l i t y , P u b l i c S c h o o l s , No n - E I R r e l a t e d Ai r Q u a l i t y i m p a c t s , i n c l u d i n g i m p a c t s t o s e n s i t i v e r e c e p t o r s , a r e di s c u s s e d i n C h a p t e r 4 . 2 , A i r Q u a l i t y , o f t h e D r a f t E I R . S e c t i o n 4 . 2 . 3 . 3 , Se n s i t i v e R e c e p t o r s , o n p a g e s 4 . 2 - 1 8 t o 4 . 2 - 1 9 d e s c r i b e s t h e t y p e s o f se n s i t i v e r e c e p t o r s , i n c l u d i n g c h i l d r e n . A i r Q u a l i t y i m p a c t s a r e de s c r i b e d b e g i n n i n g o n p a g e 4 . 2 - 2 2 . I m p a c t A Q - 4 , b e g i n n i n g o n p a g e 4. 2 - 5 7 , d i s c u s s e s t h e i m p a c t s o f t h e p r o p o s e d P r o j e c t ’ s o n s e n s i t i v e re c e p t o r s a n d c o n c l u d e s t h a t i m p a c t s t o s e n s i t i v e r e c e p t o r s w o u l d b e le s s t h a n s i g n i f i c a n t w i t h i m p l e m e n t a t i o n o f M i t i g a t i o n M e a s u r e s A Q - 4 a an d A Q - 4 b . T h e c u m u l a t i v e i m p a c t s a n a l y s i s i n t h e E I R a c c o u n t s f o r em i s s i o n s d u e t o t r a f f i c , c o n s t r u c t i o n , a n d e x i s t i n g a i r b o r n e 14 2 6   No v e m b e r  3, 2014 | Page 4  TAB L E    1:    LAT E  COM M E N T S    AN D  RES P O N S E S   T y p e 1 N u m b e r 2 N a m e Da t e R e c e i v e d T o p i c Re s p o n s e 3 co n t a m i n a n t s t h r o u g h o u t t h e c i t y . Im p a c t s t o s c h o o l f a c i l i t i e s a r e d i s c u s s e d i n C h a p t e r 4 . 1 2 , P u b l i c Se r v i c e s & R e c r e a t i o n , o f t h e D r a f t E I R b e g i n n i n g o n p a g e 4 . 1 2 - 1 8 . Im p a c t s o n s c h o o l f a c i l i t i e s w e r e f o u n d t o b e l e s s t h a n s i g n i f i c a n t d u e to i m p l e m e n t a t i o n o f G e n e r a l P l a n p o l i c i e s a n d s t r a t e g i e s , a s w e l l a s ma n d a t o r y p a y m e n t o f d e v e l o p e r i m p a c t f e e s p u r s u a n t t o S e n a t e B i l l 50 ( S B 5 0 ) . A s d i s c u s s e d o n p a g e 4 . 1 2 - 1 8 , t h e C a l i f o r n i a S t a t e Le g i s l a t u r e , u n d e r S e n a t e B i l l 5 0 , h a s d e t e r m i n e d t h a t p a y m e n t o f sc h o o l i m p a c t f e e s s h a l l b e d e e m e d t o p r o v i d e f u l l a n d c o m p l e t e sc h o o l f a c i l i t i e s m i t i g a t i o n . A l l n e w d e v e l o p m e n t s p r o p o s e d p u r s u a n t t o th e a d o p t i o n o f t h e p r o p o s e d P r o j e c t w i l l b e r e q u i r e d t o p a y t h e s c h o o l im p a c t f e e s a d o p t e d b y t h e S C U S D , a n d t h i s r e q u i r e m e n t i s co n s i d e r e d t o f u l l y m i t i g a t e t h e i m p a c t s o f t h e p r o p o s e d P r o j e c t o n sc h o o l f a c i l i t i e s , w h i c h c o u l d i n c l u d e t h e c o n s t r u c t i o n o f n e w s c h o o l s a s no t e d b y t h e c o m m e n t e r . Tr a f f i c r e l a t e d s a f e t y i s s u e s a r e d i s c u s s e d i n C h a p t e r 4 . 1 3 , Tr a n s p o r t a t i o n a n d T r a f f i c , I m p a c t T R A F - 3 , w h i c h c o n c l u d e s t h a t t h e pr o p o s e d P r o j e c t w o u l d n o t c r e a t e s a f e t y i m p a c t s . 13 B L C - 1 3 I v o r E . S a m s o n , D e n t o n s US L L P 10 / 9 / 2 0 1 4 L a n d U s e C o m p a t i b i l i t y , Tr a f f i c , E c o n o m i c i m p a c t s , No n - E I R r e l a t e d Th e c o m m e n t e r r e q u e s t s t h a t t h e s e c o m m e n t s b e w i t h d r a w n . S e e Co m m e n t L e t t e r L C - 1 6 b e l o w . 14 B L C - 1 4 C a t h e r i n e A l e x a n d e r 1 0 / 1 0 / 1 4 T r a f f i c , N o i s e , Q u a l i t y o f Li f e , N o n - E I R r e l a t e d Th e c o m m e n t e r r e q u e s t s t h a t t h e s e c o m m e n t s b e s u p e r s e d e d b y t h e i r co m m e n t s s u b m i t t e d o n O c t o b e r 1 3 , 2 0 1 4 . S e e C o m m e n t L e t t e r L C - 15 b e l o w . 14 2 7   No v e m b e r  3, 2014 | Page 5  TAB L E    1:    LAT E  COM M E N T S    AN D  RES P O N S E S   T y p e 1 N u m b e r 2 N a m e Da t e R e c e i v e d T o p i c Re s p o n s e 3 15 B L C - 1 5 C a t h e r i n e A l e x a n d e r 1 0 / 1 3 / 1 4 T r a f f i c , N o i s e , Q u a l i t y o f Li f e , N o n - E I R r e l a t e d Th e c o m m e n t e r d e s c r i b e s e x i s t i n g c o n d i t i o n s . Tr a f f i c i m p a c t s a r e d i s c u s s e d i n C h a p t e r 4 . 1 3 , T r a n s p o r t a t i o n a n d Tr a f f i c , o f t h e D r a f t E I R b e g i n n i n g o n p a g e 4 . 1 3 - 4 9 . T h e a n a l y s i s w a s co n d u c t e d i n a c c o r d a n c e w i t h t h e s t a n d a r d s a n d m e t h o d o l o g i e s s e t fo r t h b y t h e C i t y o f C u p e r t i n o a n d S a n t a C l a r a V T A . No i s e i m p a c t s t o n o i s e a r e d i s c u s s e d i n C h a p t e r 4 . 1 0 , N o i s e , o f t h e Dr a f t E I R b e g i n n i n g o n p a g e 4 . 1 0 - 2 7 . Im p a c t s o n s c h o o l f a c i l i t i e s a r e d i s c u s s e d i n C h a p t e r 4 . 1 2 , P u b l i c Se r v i c e s a n d R e c r e a t i o n , o f t h e D r a f t E I R b e g i n n i n g o n p a g e 4 . 1 2 - 1 8 . Pu r s u a n t t o C E Q A S e c t i o n 1 5 1 3 1 , E c o n o m i c a n d S o c i a l E f f e c t s , ec o n o m i c o r s o c i a l e f f e c t s o f a p r o j e c t , s u c h a s e f f e c t s o n p r o p e r t y va l u e s a n d c o m m u n i t y c h a r a c t e r , s h a l l n o t b e t r e a t e d a s s i g n i f i c a n t ef f e c t s o n t h e e n v i r o n m e n t u n l e s s t h e y l e a d t o s i g n i f i c a n t p h y s i c a l ef f e c t s . 16 B L C - 1 6 I v o r E . S a m s o n , D e n t o n s US L L P 10 / 1 3 / 1 4 N o n - E I R r e l a t e d T h e c o m m e n t e r ’ s f o r m a l w i t h d r a w a l o f t h e i r O c t o b e r 9 , 2 0 1 4 l e t t e r i s ac k n o w l e d g e d . 17 B L C - 1 7 P e t e r P a u , P r i n c i p a l a n d Fo u n d e r , S a n d H i l l Pr o p e r t y C o m p a n y 10 / 1 3 / 1 4 N o n - E I R r e l a t e d T h e c o m m e n t i s a c k n o w l e d g e d . 18 B L C - 1 8 C a r l e n e M a t c h n i f f 1 0 / 1 4 / 1 4 N o n - E I R r e l a t e d Th e c o m m e n t i s a c k n o w l e d g e d . 19 B L C - 1 9 D a r r e l L u m 10 / 1 6 / 1 4 N o n - E I R r e l a t e d . Th e c o m m e n t i s a c k n o w l e d g e d . 20 B L C - 2 0 J . B l a i r V o l c k m a n n 1 0 / 1 6 / 1 4 N o n - E I R r e l a t e d . Th e c o m m e n t i s a c k n o w l e d g e d . 21 B L C - 2 1 J o h n F . W a r d a 1 0 / 1 7 / 1 4 N o n - E I R r e l a t e d . Th e c o m m e n t i s a c k n o w l e d g e d . 22 B L C - 2 2 T o m a n d E l e a n e H a l l 1 0 / 2 3 / 1 4 N o n - E I R r e l a t e d . Th e c o m m e n t i s a c k n o w l e d g e d . 23 B L C - 2 3 A l v i n a n d S h i r l e y D e Ri d d e r 10 / 2 4 / 1 4 N o n - E I R r e l a t e d . T h e c o m m e n t i s a c k n o w l e d g e d . 14 2 8   No v e m b e r  3, 2014 | Page 6  TAB L E    1:    LAT E  COM M E N T S    AN D  RES P O N S E S   T y p e 1 N u m b e r 2 N a m e Da t e R e c e i v e d T o p i c Re s p o n s e 3 24 B L C - 2 4 A n o n y m o u s 10 / 2 5 / 1 4 N o n - E I R r e l a t e d . Th e c o m m e n t i s a c k n o w l e d g e d . 25 B L C - 2 5 U r s M a d e r 10 / 2 5 / 1 4 N o n - E I R r e l a t e d . Th e c o m m e n t i s a c k n o w l e d g e d . 26 B L C - 2 6 M a r k T e r s i n i 10 / 2 7 / 1 4 N o n - E I R r e l a t e d . Th e c o m m e n t i s a c k n o w l e d g e d . 27 B L C - 2 7 M a x K . A g o s t o n 1 0 / 2 7 / 1 4 N o n - E I R r e l a t e d . Th e c o m m e n t i s a c k n o w l e d g e d . 28 B L C - 2 8 P a u l B r o p h y 10 / 2 7 / 1 4 N o n - E I R r e l a t e d . Th e c o m m e n t i s a c k n o w l e d g e d . 29 B L C - 2 9 C l a i r e A r n o l d 10 / 3 0 / 1 4 P u b l i c S c h o o l s Im p a c t s t o s c h o o l f a c i l i t i e s a r e d i s c u s s e d i n C h a p t e r 4 . 1 2 , P u b l i c Se r v i c e s & R e c r e a t i o n , o f t h e D r a f t E I R b e g i n n i n g o n p a g e 4 . 1 2 - 1 8 . Im p a c t s o n s c h o o l f a c i l i t i e s w e r e f o u n d t o b e l e s s t h a n s i g n i f i c a n t d u e to i m p l e m e n t a t i o n o f G e n e r a l P l a n p o l i c i e s a n d s t r a t e g i e s , a s w e l l a s ma n d a t o r y p a y m e n t o f d e v e l o p e r i m p a c t f e e s p u r s u a n t t o S e n a t e B i l l 50 ( S B 5 0 ) . A s d i s c u s s e d o n p a g e 4 . 1 2 - 1 8 , t h e C a l i f o r n i a S t a t e Le g i s l a t u r e , u n d e r S e n a t e B i l l 5 0 , h a s d e t e r m i n e d t h a t p a y m e n t o f sc h o o l i m p a c t f e e s s h a l l b e d e e m e d t o p r o v i d e f u l l a n d c o m p l e t e sc h o o l f a c i l i t i e s m i t i g a t i o n . 30 B L C - 3 0 C l a u d i o B o n o 10 / 3 1 / 1 4 N o n - E I R r e l a t e d . Th e c o m m e n t i s a c k n o w l e d g e d . 31 B L C - 3 1 C l a u d i o B o n o 10 / 3 1 / 1 4 N o n - E I R r e l a t e d . Th e c o m m e n t i s a c k n o w l e d g e d . 32 B L C - 3 2 C l a u d i o B o n o 10 / 3 1 / 1 4 N o n - E I R r e l a t e d . Th e c o m m e n t i s a c k n o w l e d g e d . 33 B L C - 3 3 C l a u d i o B o n o 10 / 3 1 / 1 4 N o n - E I R r e l a t e d . Th e c o m m e n t i s a c k n o w l e d g e d . 34 B L C - 3 4 S t e v e G a z z e r a 1 0 / 3 1 / 1 4 N o n - E I R r e l a t e d . Th e c o m m e n t i s a c k n o w l e d g e d . 14 2 9   No v e m b e r  3, 2014 | Page 7  TAB L E    1:    LAT E  COM M E N T S    AN D  RES P O N S E S   T y p e 1 N u m b e r 2 N a m e Da t e R e c e i v e d T o p i c Re s p o n s e 3 35 B L C - 3 5 G e o r g e A n d e r l 1 0 / 3 1 / 1 4 T r a f f i c Tr a f f i c i m p a c t s a r e d i s c u s s e d i n C h a p t e r 4 . 1 3 , T r a n s p o r t a t i o n a n d Tr a f f i c , o f t h e D r a f t E I R b e g i n n i n g o n p a g e 4 . 1 3 - 4 9 . T h e a n a l y s i s w a s co n d u c t e d i n a c c o r d a n c e w i t h t h e s t a n d a r d s a n d m e t h o d o l o g i e s s e t fo r t h b y t h e C i t y o f C u p e r t i n o a n d S a n t a C l a r a V T A . 36 B L C - 3 6 J i a l i n S o n g a n d Ho n g l i a n g C h a n g 10 / 3 1 / 1 4 S c h o o l s I m p a c t s t o s c h o o l f a c i l i t i e s a r e d i s c u s s e d i n C h a p t e r 4 . 1 2 , P u b l i c Se r v i c e s & R e c r e a t i o n , o f t h e D r a f t E I R b e g i n n i n g o n p a g e 4 . 1 2 - 1 8 . Im p a c t s o n s c h o o l f a c i l i t i e s w e r e f o u n d t o b e l e s s t h a n s i g n i f i c a n t d u e to i m p l e m e n t a t i o n o f G e n e r a l P l a n p o l i c i e s a n d s t r a t e g i e s , a s w e l l a s ma n d a t o r y p a y m e n t o f d e v e l o p e r i m p a c t f e e s p u r s u a n t t o S e n a t e B i l l 50 ( S B 5 0 ) . A s d i s c u s s e d o n p a g e 4 . 1 2 - 1 8 , t h e C a l i f o r n i a S t a t e Le g i s l a t u r e , u n d e r S e n a t e B i l l 5 0 , h a s d e t e r m i n e d t h a t p a y m e n t o f sc h o o l i m p a c t f e e s s h a l l b e d e e m e d t o p r o v i d e f u l l a n d c o m p l e t e sc h o o l f a c i l i t i e s m i t i g a t i o n . 37 B L C - 3 7 K a r e n F a r r e l l y 1 1 / 0 1 / 1 4 N o n - E I R r e l a t e d . Th e c o m m e n t i s a c k n o w l e d g e d . 38 B L C - 3 8 V i r g i n i a T a m b l y n 1 1 / 0 1 / 1 4 N o n - E I R r e l a t e d . Th e c o m m e n t i s a c k n o w l e d g e d . No t e s : 1. T h e c o m m e n t “ t y p e ” p e r t a i n s t o t h e c a t e g o r i e s u s e d t o o r g a n i z e t h e c o m m e n t s s u b m i t t e d o n t h e D r a f t E I R i n t h e R e s p o n s e t o C o mm e n t s D o c u m e n t . T y p e A = A g e n c i e s a n d S e r v i c e P r o v i de r s a n d T y p e B = P r i v a t e I n d i v i d u a l s a n d O r g a n i z a t i o n s ; 2. T h e c o m m e n t n u m b e r L C = L a t e C o m m e n t . T h e La t e C o m m e n t l e t t e r s a r e a t t a c h e d t o t h i s m e m o . 3. T h e “ r e s p o n s e ” c o l u m n r e f e r e n c e s r e sp o n s e s p r o v i d e d i n t h e R e s p o n s e t o C o m m en t s D o c u m e n t , p u b l i s h e d o n A u g u s t 2 8 , 2 0 1 4 . 14 3 0   No v e m b e r  3, 2014 | Page 8  14 3 1 From: John Frey [mailto:johnfreyca@comcast.net]   Sent: Monday, August 18, 2014 9:58 PM  To: City Council  Subject: Growth and the straining of our services .    Dear Honorable City Council Members,             I am writing you on my concerns about our growth and straining of our services.  I have  lived in Cupertino for approximately 22 years and grew up in Mtn. View / Palo Alto.  I have  firsthand witnessed how Silicon Valley changed from the orchards I rode my bike though to the  concrete jungle we now live in.  I truly understand businesses need to grow and that they  provide valuable tax revenue to Cupertino.   But when I see our businesses being bulldozed then  replaced with buildings with businesses on the bottom and APARTMENTS / CONDOS above  them, it is a bit upsetting.             Is our City Planning strategy to become like San Francisco or San Jose?  Or are we going to  make Cupertino one of the most balanced Cities in Santa Clara?  Where businesses are  welcomed and residents have a safe beautiful neighborhood to raise their children in.  When we  approve plans to build these high rises we take away from this. We put more cars on our roads,  more calls for service from our Deputies and Fire / Paramedics, and more children in our  schools. All but one of which, I have not seen any growth in.  Our roads have not gotten wider,  there are no more Deputies patrolling though their beats have increased.  This also can be said  about our Fire / Paramedics too.  We do have construction on new classrooms (etc.) in our  schools but these school are in established neighborhoods that were designed for single family  homes back in 60's, 70's, and part of the 80's.  Traffic around these schools are becoming a  parking lot. Blocking city residents from being able to exit their neighborhoods and sometime  their own driveways.            I have personally talked to Deputies who have stated to me that if they work in the west  end of Cupertino and a call comes out on the east end of Cupertino, they know it can take up to  30 mins. or more depending on the time of day.  When you approve apartments / condos above  old businesses, you indirectly create a whole new beat for each floor added.  This adds many  more calls for service with the same amount of Deputies we have had since I moved here back  in 90's with no one to replacing the vacuum.  We need more Deputies!           I know we are building a "new downtown" off of Stevens Creek Blvd.  I also know we are  building the new Apple 2 building off of Wolfe.  These are hugh projects and will bring more  strain on our services and way of life here in Cupertino.  Some for the good and I feel more for  the bad.  The bad is the high density housing and traffic!  It really has to stop, we cannot support  any more of these projects without destroying our way of life here in Cupertino.  If a single  family home has to cost 2 million dollars, then unfortunately it is the cost of living here in  Cupertino.  We have no more room for this type of high density growth!  Or are we going the  way of being the San Francisco of the South Bay?   I know every one of my neighbors feel the  same way about limiting the growth.  I know a few years ago we had a petition passed that City  Hall cannot approve any construction above 3 stories without voter approval (correct me if I am  wrong).  That was due to the big eye sore at the Crossroads (Stevens Creek and De Anza) being  built with high density housing. Please, don't make the citizens of Cupertino have to speak up  again.     1432 All of you live here and represent us.  Control the Planning Commission and preserve what is left  of our city community!         Thank you for your consideration to this matter!         Respectfully,               John Frey  1433 -----Original Message----- From: Barbara Rogers [mailto:barbsbucket@comcast.net] Sent: Monday, August 25, 2014 3:04 PM To: Christopher Valenzuela Subject: Re: Aug. 28 Housing Commission Meeting Hi, C.J. and thanks for your courtesy. I'm sorry I didn't see reference to senior housing in the staff report. But glad it was there--and not surprised that it would have been included. As the City is fortunate to have excellent members of staff. Please accept my apologies for not reading well enough to find the staff reference. And extend my apologies, as appropriate. Thnx, again, C.J. Love, BR On Aug 25, 2014, at 2:08 PM, Christopher Valenzuela <ChristopherV@cupertino.org> wrote: Hi Barbara, I have forwarded your comment below to the Housing Commission as I didn't see the Housing Commission included on your prior e-mail. Thank you. Christopher "C.J." Valenzuela, Senior Housing Planner City Hall Community Development Department 10300 Torre Ave Cupertino, CA 95014 408-777-3251 (Phone) christopherv@cupertino.org (E-mail) www.cupertino.org (Website) -----Original Message----- From: Barbara Rogers [mailto:barbsbucket@comcast.net] Sent: Monday, August 25, 2014 1:03 PM To: Christopher Valenzuela; City of Cupertino Fine Arts Cc: Gary Chao; Aarti Shrivastava Subject: Aug. 28 Housing Commission Meeting To: Housing Commission Chair Raman and Members Wilson, Barnett, Chu, and Maroko— I am very sorry to not be able to attend your meeting this Thurs. Aug. 28 at 9:00. I have a conflict on 2nd and also on 4th Thurs. mornings, unfortunately. Therefore, I'm emailing my input which I hope you will adopt in some form in your recommendations to the Planning Commission. 1434 Specifically, I look at the Housing Element section of the staff report for your meeting this Thurs. morning. I find no reference to older adult (senior) housing an the need for it. Perhaps I may have overlooked something in the long, well-written report. I did testify at several of the workshops where it seemed to me that my comments were welcomed and would be included. I ask that you include some reference to the need for older adult housing in Cupertino, as well as housing for all segments of the population, in your recommendations to the Planning Commission. And not just below-market-rate and subsidized housing but also for-profit units. There is ample documentation of this need which exists all over the country and is growing. I've made available to staff material relative to successful for-profit and subsized senior housing projects constructed in the Bay Area, across the U.S. and world-wide. This need for senior housing, both government-assisted and also for profit, is growing in Cupertino, as elsewhere, as the senior demographic is burgeoning. I hope that in recognizing this need in Cupertino you will recommend for the City of Cupertino to increase the housing available in Cupertino for older adults. Thanks, again, for all you do to benefit our community and its residents-- that you care enough to give of your time and expertise and make a difference for the better. I look forward to welcoming you to the Sept. 30 Forum Aging-in-Place. Thnx, again, Love, BR 1435 ~IRVINE COMPANY Since 1864 September 4,2014 Ms.Piu Ghosh,Senior Planner City of Cupertino 10300 Torre Avenue Cupertino,CA 95014 Dear Ms.Ghosh, The intent of this letter is to reinforce that The Irvine Company (TIC)has a strong desire to plan the future redevelopment of the Hamptons in full cooperation with Apple,including but not limited to security,height,landscape buffering,and amenities that could serve possible future Apple employees that may choose to reside within close proximity of their employment. From the beginning of our dialogue with Apple,we were encouraged that providing additional housing near the Apple Campus 2 (AC2)would create an opportunity to reduce auto trips for employees living within walking and bicycling distance to AC2.In fact,the AC2 EIR includes a mitigation measure, which requires Apple to expand the Transportation Demand Management (TOM)Program to reduce traffic impacts.This TOM Program expansionrequires implementation ofTDM measures that increase Apple's non-single occupant vehicle mode to 34%at full occupancy of the site.The GPA's proposed increase of housing units for the Hamptons site will provide a significant increase in housing within a short walking!bicycling distance to AC2,helping Apple achieve this TOM requirement. Recently,management at TIC were surprised to read the letter Apple sent to the City,since prior to that, the two companies had an otherwise amicable and cooperative relationship over the years. That cooperation began with a significant amount of coordination between TIC and Apple during the period in which the AC2 OEIR was being prepared,circulated for public comment,and certified by the City of Cupertino.This coordination took place between 2011 and 2013 and culminated with the execution oftwo separate agreements between Apple and TIC (a Land Swap Agreement and a Construction Impact Mitigation Agreement). During the winter of2011,Apple approached TIC regarding the expected need to mitigate the traffic impacts associated with development of AC2.They expected that EIR mitigation for the project would include the widening of North Wolfe Road between Pruneridge Avenue and 1~280,requiring right of way from the Hamptons.In addition,their proposed AC2 development included the closure of Pruneridge Avenue between the Hampton's access and North Tantau Avenue.Apple communicated to the Company that it was their desire,as well as the City of Cupertino's,that the Company and Apple reach agreement on this North Wolfe Road widening and Pruneridge Avenue closure prior to the City Council's approval of the AC2 project and certification of their project EIR. 690 N.McCarthy Blvd.,Suite 100 I Milpitas,CA 95035 1436 Over the course of nearly t\vo years,Apple and TIC resolved a number of issues to address the impacts associated with the NOIth Wolfe Road widening and the vacation of Pruneridge Avenue.These included the design parameters of the North Wolfe roadway widening (i.e.number and width of lanes),the design parameters ofthat portion of Pruneridge Avenue that would remain between the Hamptons access and North Wolfe Road,review offuture landscaping plans for the edge conditions surrounding the Hamptons,trail and sidewalk requirements,and right of way compensation.These discussions concluded with execution of a Land Swap Agreement bet\veen the parties in November 2013 and eliminated any need for the City of Cupertino to use its powers of eminent domain to acquire the needed right of way along North Wolfe Road.In the end,TIC agreed to dedicate access to Apple,Inc.in a Land Swap for the price of $1 00. Our cooperation also went beyond the issue of required access.In May 2013,the DEIR for AC2 was circulated to the public.After TIC's review of the DEIR,we believed that a number of environmental issues had not been adequately addressed.TIC informed Apple of our concerns three weeks prior to the close of the DEIR review period.Apple requested that TIC and Apple execute a side agreement to address our concerns in lieu of submitting a formal DEIR comment letter to the City of Cupertino.Over the next three weeks,we engaged in a series of communications with Apple to discuss our issues.This coordination culminated in the execution ofa Construction Impact Mitigation Agreement between the parties in July 2013.This Agreement dealt with a number of issues including: •Commitment by TIC to not write a DEIR comment letter •Spillover parking into Hamptons •Maintaining emergency access to the Hamptons site at all time •Uses permitted in nearby Landscape Maintenance Building on AC2 site •Noise limits from Central Plant •Limitations on use of Pruneridge for construction traffic •Weekend construction impacts,Dust control •Design of temporary noise wall and Lighting shields Despite TIC's general concern about the increased traffic associated with the AC2 project and the impacts associated with reduced accessibility to the Hamptons site caused by the closure of a section of Pruneridge,TIC was willing to work with Apple to eliminate the need to raise concerns during the DEIR and hearing process.Even though our residents are inconvenienced on a daily basis by the noise,truck traffic,dust,and general inconvenience of the construction,we have honored all prior agreements. Now,as we explore future redevelopment of our site,and prior to filing plans fora specific project,Apple has expressed concern in writing to the City,and also testified against redevelopment of our site at a recent Housing Commission meeting.We wish to assure the City that TIC is willing to reduce heights to 60 feet along the Apple boundary and will design the future proposal within a 60 to 75 foot range with taller heights along the freeway and stepping down the heights on Wolfe Road and along Apple's boundary.With respect to Apple's privacy concerns,TIC is committed to incorporating appropriate setbacks,landscape buffering,and design features into the design of the Hamptons redevelopment,in order to respect the privacy of AC2.In fact,we have already engaged Apple's landscape architect,Olin, with Apple's pernlission,to assure Apple that we would plant adequate trees and foliage to screen and buffer views from AC2 to the I-Iamplons site and vice versa. 1437 Regarding traffic,it is worth noting,a positive community benefit of redevelopment of tile Hamptons,is related to Section 3.14 of the Apple Development Agreement.This section requires their payment of $1,000,000 towards a transportation study of Wolfe Road between Homestead and Stevens Creek including widening of the Wolfe Road overcrossing at 1-280.(Apple told us that they had already paid the City this study funding).However,subject to the outcome of the study,the City and Apple are to detennine funding options to implement the recommended improvements from this transportation study. One of those funding options is recognized in Section 3.14 to be a Mello-Roos Community Facilities District (CFD).Further,Section 3.14 gives the City sole discretion in making the findings with the study and the funding mechanisms.In light of this requirement,any development in the Wolfe corridor, including redevelopment of the Hamptons will necessitate the preparation of the Wolfe interchange study and will kick off the process for forming the potential funding mechanism for the improvements in this area.This is a positive benefit for the community as the Wolfe interchange is in need of study.TIC recognizes that our project,should it move forward,would be subject to an appropriate contribution to this funding district. Our goal is to continue towork with Apple on a myriad of issues that require cooperation between our two adjacent property owners,and to do so in a professional manner.We appreciate the considerable efforts of the City to develop the General Plan Amendment,Housing Element update,related zoning changes,and EIR,as well as your consideration of the facts presented in this letter. Please do not hesitate to contact me should you require additional information. Sincerely, ~~~ Carlene Matchniff Vice President Entitlements &Public Affairs The Irvine Company cc:Mayor and City Council of Cupertino David Brandt,City Manager Aarti Shrivastava,Assistant City Manager &Director of Community Development 1438 September 8,2014 Piu Ghosh Senior Planner City of Cupertino 10300 Torre Avenue Cupertino,CA 95014 RE:Citywide General Plan Amendment Proposed Resolution-Hamptons Site Dear Piu, We were pleased to read the letter from The Irvine Company ("TI(,,)confirming its intent to respect Apple's privacy and security needs in any future redevelopment of the Hamptons site.The language quoted below from TIC's letter also confirms that TIC does not want the 8S foot height limit,with no setbacks,as currently drafted in the General Plan Amendment ("GPA"): "We wish to assure the City that TIC is willing to reduce heights to 60 feet along the Apple boundary and will design the future proposal with a 60 to 75 foot range with taller heights along the freeway and stepping down the heights on Wolfe Road and along Apple's boundary.With respect to Apple's privacy concerns,TIC is committed to incorporating appropriate setbacks, landscaped buffering,and design features into the then design of the Hamptons redevelopment,in order to respect the privacy of AG." The bottom line is that Apple and TIC are on the same page,but this isn't yet reflected in the current draft of the GPA.As currently proposed,the GPA permits heights up to 8S feet with no requirement for setbacks or other buffers.This seriously damages Apple,and doesn't benefit TIC,since TIC does not require the additional height to redevelop the Hamptons site.We appreciate that the City recognized Apple's multi-billion dollar investment in Cupertino and respected our security and privacy requirements during the approval process for AC2,as reflected in the EIR and project approval findings.The City should continue to live up to that commitment by revising the GPA and adopting the specific language we previously proposed,and shown below. 'The height limit for the structures located within 50 feet of the parcel line abutting adjacent commercial properties or Pruneridge shall not exceed 60 feet.The height limit shall not exceed 60 feet for the remainder of the Hamptons site,unless the City makes special findings that an increased height,up to a maximum of 75 feet,would not infringe on the privacy and security needs of adjacent neighbors,nor unreasonably impact view corridors or sunlight,or create light or glare trespass.This may require any future development of the site to include transitions,landscaping,or other mitigations,so that the City can make the special findings specified above." Apple 1 Infinite Loop MS 21-1AC2 Cupertino,CA 95014 T 408 996-1010 F 408996-0275 wwwapple.com 1439 Piu Ghosh September 8,2014 Page 2 of 2 Irs vital for tne City to a dreSsthls Issue now.Otnerwlse,the City may have unintentionally limited its discretion to address project-level concerns after adopting higher density limits in the GPA.For example,California law provides that the density of a proposed project complying with the applicable General Plan,zoning and development policies cannot be reduced unless the City makes specific written findings that a reduction in density is needed to avoid health or safety effects.Gov.Code sec.65589.5(j).There is also a streamlined CEQA review for residential projects that are consistent with the General Plan,in which only impacts that are "peculiar"to the project are analyzed.Pub.Res.Code sec.21083.3.Therefore,the City should set forth in the GPA the key issues that need to be taken into account in considering potential redevelopment of the Hamptons site,since deferring this step may unduly bind the City in the future.We believe the language we proposed does that,and is consistent with TIC's statements regarding its plans for the Hamptons site. Kind regards, Dan Whisenhunt Senior Director Real Estate &Development Apple cc:Mayor and City Council of Cupertino Planning Commission of Cupertino David Brandt,City Manager Aarti Shrivastava,Director of Community Development 2 1440 From: Ruby Elbogen <rgelbogen@aol.com> Date: September 12, 2014 at 8:06:04 AM PDT To: gwong212@aol.com Subject: Mr. Mayor - "Hell No, I Won't Go" Dear Mr. Mayor - As I watched the Planning Commission meeting last evening, and assumed the Irvine Company was pulling a prank on the Commissioners by telling them that the Company from The OC is planning to add 800-ish (give or take 3) apartments to what they already have here--I laughed and waited for the punch line. Little did I know the joke is on us. So, when this is approved--are we expected to give up OUR water for them, as well as for Apple--so they can flush their thousands of new toilets? If not, where will the water come from? And, where will their kids go to school--even though it's not the City Council's problem, so to speak, you will still be blamed for letting it happen. You could tell the Irvine Company to go back to Disneyland. Thanks, Ruby Thanks & Regards, Ruby Elbogen, Editor/Publisher The C Magazine & Cupertino-News.com 408/355-0575 1441 From: Ruby Elbogen [mailto:rgelbogen@aol.com]  Sent: Tuesday, September 16, 2014 8:54 AM  To: George Schroeder  Subject: The Fence Between Vallco & Our Neighborhood    Hi, George ‐ Rumor has it that Apple, the City and/or some other entity wants to take down the  fence between Vallco and our neighborhood.  Our home is on No. Portal.  I can only assume that  all the people involved, who are fairly new to Cupertino are unaware of Propositions D & E‐‐and  the fact that our neighborhood fought a huge war to keep that fence up.  And, does the City and  Apple, etc. realize how dumb the premise is that in order to promote Walkability those who  want to turn our area of Cupertino into what it doesn't want to be‐‐a friggin' Pass Through for  Apple employees ‐‐who profess Walkability, but who can't or won't walk around our very nice  quiet area?  We want to nip this in the bud early, but we can gather a crowd to make it an issue.   What is your advice?  Cheers, Ruby    Thanks & Regards,  Ruby Elbogen,  Editor/Publisher The C Magazine & CMagazineOnline.com  408/355‐0575  1442 1443 1444 1445 From: Dicksteinp@aol.com [mailto:Dicksteinp@aol.com]   Sent: Monday, October 06, 2014 10:17 AM  To: Gilbert Wong; Rod Sinks; Orrin Mahoney; Barry Chang; Mark Santoro  Cc: travigne‐villas‐hoa@googlegroups.com; faridakhan123@yahoo.com;  pamcafee1942@yahoo.com; betspix@gmail.com; amars10@hotmail.com; rgelbogen@aol.com  Subject: Council EIR session Tue Oct 7 4‐6:30pm  Gentlemen: Since I will probably be late for tomorrow's meeting, which is beginning rather early, I  am submitting, or reiterating, some comments in advance. 1) The EIR is a bit of a whitewash. That is, the facts are there but the conclusions need to  be taken with a large grain of salt. Impacts on traffic, air pollution and water supply that  are reported as "less than significant" by the authors may not be so regarded by the  ordinary residents of Cupertino. 2) The responses to the comments on the EIR are a series of justifications ‐‐ was there  ever any acknowledgement that in a particular instance the commenter might be right  and therefore something ought to be scaled back? 3) I have already spoken at length about the impact on traffic and air quality of further  housing development on Blaney Avenue, but now, once again, I wish to address water  supply. 4) Water is already being rationed north of here, while the latest issue of Cupertino  Scene is urging residents to conserve water and suggesting several ways to do so. Yet  what good does it do for us to take shorter showers if in the end water is not being  conserved but simply transferred to thousands of new apartments and offices? Climate  change is not going way and the figures provided in the EIR for a five‐year drought  situation belie their sanguine conclusions. 5) I am unclear as to what will happen on November 3. I hope that the final Plan will not  be adopted the day before the elections! Many Silicon Valley residents work long hours  and cannot attend an endless series of meetings but they do vote. Any final decisions  should wait. Sincerely, Phyllis Dickstein Travigne Villas 1446 From: <info@cupertinogpa.org> Date: Mon, Oct 6, 2014 at 8:57 PM Subject: Comment from City of Cupertino General Plan Amendment Website To: info@cupertinogpa.org Comment Submitted by: Name: Kai Wetlesen Organization: None Given Email: kwetlesen@mac.com Possibly Regarding Page: /documents/view/195 Subject: Error in General Plan Amendment, page 4.13-25 Comment: regarding: The General Plan Hello, The headways cited in 4.13-15 are not correct according to VTA timetables within the Cupertino city limits. The following corrections should be made to the headways table: 23: 10 to 12 minutes 25: 20 to 30 minutes 26: 30 minutes 55: 30 minutes Regards, Kai Wetlesen 1447 14 4 8 14 4 9 1450 1451 1452 1453 1454 1 From: Catherine Alexander [mailto:   Sent: Friday, October 10, 2014 2:47 PM  To: George Schroeder  Subject: Re: Cupertino General Plan Amendment and Housing Element Update ‐ Planning  Commission    Thanks, George.  I have a board meeting that night at one of the non‐profits whose Web site I write/manage, and  can't attend.    My comments for the record:    In my opinion, new, dense housing complexes will ruin property values for single‐family homeowners  and impact the historic safety of our Cupertino neighborhoods, overcrowd our struggling schools  (Building up is not a viable solution) and increase traffic and parking problems to unbearable levels.  Residents who pay property taxes here are already struggling with traffic congestion and parking  problems at shopping areas due to downsized parking lots designed to increase acreage available for  development. Many residents now shop and dine in other cities where parking and congestion is  more manageable, as was mentioned more than once by residents during the hearings, yet  apparently not recorded in the minutes by consultants working for developers and the City.    In my opinion, our Cupertino City Council and the current Community Development manager seem  to care about housing Apple employees who bike and walk to work and are not working for long  term residents who own single family homes here and want to preserve their quality of life.    Seniors, residents with small children and those who are disabled are not able bike or walk to shops  or restaurants in overdeveloped areas of Cupertino. These physically‐impacted groups seem to have  no place in the City of Cupertino envisioned by the manager of the Cupertino Community  Development team, who seems unwilling to hear any actual opinions and experiences from residents  which differ from her own somewhat rigid futuristic vision and theories of how we should want to  live here. Her goals for our City seem to be based on her cited and compiled, theoretical planning  statistics, not what residents want.    The Cupertino Community Development manager apparently was part of the team who created the  current traffic and parking mess in downtown Mountain View, based on the same bike and public  transit theories and statistics she seems to using now, to envision the Cupertino she feels would be  best for residents. Despite the feedback that most residents disagree with her, these theories trump  actual residents views, so some of us have stopped attending public hearings because she and the  City Council don't seem to be willing to hear that residents don't want any of the changes planned  for Cupertino and its posse of consultants and developers. Residents are interrupted or cut off at  hearings and some of our anti‐growth views don't seem to be recorded by the consultants working  for developers and City.    The Cupertino Community Development manager was apparently one of the city planning team who  created the "new Mountain View," where travel and parking is now almost inaccessible, where  Mountain View residents and business owners must now purchase $300 annual parking permits to  visit shops and restaurants or park near their own downtown businesses.    Downtown Mountain View restaurants and shops on Castro Street are now almost inaccessible to  residents, based on severe traffic and parking problems every evening. City visitors now attempt to  1455 2 park in front of resident's homes in those residential areas several blocks deep surrounding Castro  Street, since the same, "everyone will bike and take public transit" thinking, apparently by this  Cupertino planning manager during her tenure in Mountain View, was used to tell residents what  they should want in their City based on statistical models which were unrealistic, so vastly  inadequate and poorly planned parking, has become the new norm in Mountain View.    Now, Mountain View residents are living in a civic nightmare of continual congestion, with residents  and visitors circling blocks in every direction for over 30 minutes most evenings, just to find one  parking spot. This is not safe for families, children, the elderly, or the disabled, who use cross walks  and need parking in front of their own homes, and who absolutely need their cars and parking spots  near Mountain View's Kaiser facility, City Hall, Library, pharmacies, grocery stores and other shops.    Cupertino residents do not want to see our City condense itself to a limited bike/mass transit‐ centered future, where every foot of our City is not just developed, but over developed, and the  elderly and disabled, or those with small children are disenfranchised.    Long‐time residents don't want their community to become a series of high‐rise apartment  complexes and condos over businesses, or of shopping areas, parks and libraries which no longer  have adequate parking and green space for residents. High‐density developments age and degrade  over time and look shabby, and they are hard to remove once they are in place because they make  money for the owners, who most often do not live in Cupertino themselves and don't have to live  near them or deal with the traffic, health and safety problems they create.    Protect Cupertino property for those home and business owners who actually live in our City and  who care about its long term quality of life, its history, its safety, its schools, and our families,  seniors, and disabled. Create a balanced City which is not overly focused on one business or one  demographic, at the expense of everyone else in the City.    Residents with single family homes who moved here expecting their neighborhoods to exist of other  families in similar single family homes, who were told Cupertino had a "no‐growth" policy when they  moved here, do not to be overlooked by apartment and condo complexes, multistory garages, or  Santana Row‐like developments that, let's face it, no matter how fancy they are, are fake re‐ creations of historic buildings and look fake and tacky.    Cupertino demolished (and should have preserved) its own historic buildings, and lost what could  have been its own Los Gatos‐like authentic Santa Cruz/University Avenue quaint downtown area  with a planned civic center park at the corner of Stevens Creek and Saratoga‐Sunnyvale Road (as it  was called then).    Instead, as it always has since the 1970's, Cupertino City Council members chased the development  and industry dollar, believing the large industry du jour (remember Varian Associates/Valco Park,  Hewlett Packard, Sunsweet, Gemco, and all of the other businesses which were the answer for  Cupertino, yet have since fled) were the answer to Cupertino's future. Even now, Apple is moving to  a complex bordering Santa Clara, and my guess is that the dated and run‐down light industry  buildings it uses near Bandley Avenue, Lazaneo Avenue, and Mariani Drive, will be abandoned in the  next 5 years, with no industry filling those office space leasing gaps.    Those industries mentioned above moved away after Cupertino had already destroyed plans for  parks, Civic Centers and museums using historic buildings on those properties, which had been  previously preserved in no‐growth plans to benefit residents and our history. Sadly, we can't bring  1456 3 our historic structures back. Even the historic Cali Brothers grain silo, left to the City and destined to  become a historic park relic, since it was beloved by many here as the town's own Eiffel Tower‐like  monument when it was decorated with lights and a tree every holiday season, somehow was  mysteriously destroyed when it was entrusted to the City of Cupertino, and Apple wanted to develop  that corner lot.    Let's face it, Cupertino has apparently been for sale to the latest developer for many years now,  based on greed for revenue at City hall, with its posse of Chamber allies, consultants and developers.    What Cupertino could have been, if creating a city which respected our history, environment (while  refusing funding for civic life projects and programs from our greatest local polluter, Lehigh Cement),  neighborhoods, green space and quality of life for residents and families, was lost long ago.    The latest consultant and developer‐based dance around producing an Amended City Plan, is just  another step towards turning Cupertino into Mountain View, where there is little parking, cramped  residential areas and schools, and where some historic structures have been destroyed to create  fake, new buildings with an historic look, to jump on the current Santana Row‐themed fad of fake  historic Victorian or Mediterranean‐like architecture, for those who want to feel like they are in  historic Los Gatos or San Francsico, yet don't want to make the effort to drive there to experience  real respect for history and authentic architectural preservation.    Folks, you can't sell phony, high‐density Victorian and Mediterranean architecture to high tech  workers. These workers are highly educated and know the difference between fake Victorian and  Mediterranean cheap residential reproductions, which is why many of them choose to live in Los  Gatos, Saratoga, Los Altos and Palo Alto, where actual historical homes and structures were  thoughtfully preserved by those cities and still exist as businesses and single family homes. High  density housing in those cities is not crammed in among single family neighborhoods, but limited to  light industrial areas, so home values and the quality of life in city centers, is not impacted by less  desirable combined residential and business developments.    Best,  Catherine Alexander  http://www.siliconvalleylibrarian.com/        From: Catherine Alexander [mailto:cdjalexander@gmail.com]  Sent: Friday, October 10, 2014 3:58 PM  To: George Schroeder  Subject: Re: PS ‐ Cupertino General Plan Amendment and Housing Element Update ‐ Planning  Commission    Hello George,    Please also add this to the record:    As a Cupertino resident, my single family home, which used to be inside and surrounded by orchards,  was allowed, through re‐zoning and City Plan amendments, to sit beside a huge apartment complex  and its entry lane, once our neighbor sold his orchard land to developers.    1457 4 In what once was a clean and quiet neighborhood of single family homes, my home and front yard  now and for many years since the apartment development was built, has had chronic:      *   Car alarms at all hours.    *   Traffic at all hours.    *   Honking at all hours.    *   Dogs barking and cats howling at all hours.    *   Cats defecating in my back yard at night. (I don't have pets.)    *   Cats having kittens in my yard.    *   Rats regularly coming under my fence, since the trash bins in the complex parking area are  directly across the entry lane from my back yard.    *   Conversations and car key electronic beeping noises at all hours on the entry lane near the  bedroom windows of my home.    *   People trespassing and walking under my bedroom windows at all hours. (the City will not allow  a fence to be built near the property line.)    *   Loitering running vehicles and parked vehicles in no‐parking areas in front of my home, with  people using phones, talking, visiting, eating and smoking in illegally parked cars, since the  apartment complex is non‐smoking.    *   People parked across the street from my driveway (in a no parking area) and taking photos of my  home and garage, when I have my garage doors open.    *   Apartment managers (male) who watched me through their tall shrubs, when I mowed my lawn  or trimmed my plants.    *   Cigarettes, cigarette butts, food, cups, wrappers, used and unused condoms, and used and  unused sanitary napkins/tampons, and other food related and personal trash, which is regularly  tossed in my yard and under my 50‐year‐old redwood trees, which I have to clean up.    *   Weeds and quince apples left behind apartment complex bushes at their property line, which are  never removed by apartment yard maintenance workers (I have asked) so I am left to remove them  myself to prevent the spread of seeds/weeds into my yard, or rodents and pests near, in or under my  home.    *   People regularly smoking near my historic trees without any apparent common sense or respect  for my property or fire safety, flicking their live ashes and butts in my yard on dry mulch under my  dry trees, which I can't water during this drought.    *   People also smoking and flicking live ash and butts under dry trees, leaves and needles, on the  state property across the street from my home, creating ongoing neighborhood fire danger, despite  4 years of requesting that the apartment complex create a smoking area on its own property, to  improve chronic littering problems and fire safety in the neighborhood.    *   People sitting under the trees on my property, in my front yard, without respect to property  boundaries.    *   Workers from the complex, parking in my driveway to make phone calls and eat lunch.    *   Repossession car haulers parking across my driveway as they quietly walk through apartment  complex parking areas to repossess cars from delinquent car buyers, usually between midnight and  1:30 a.m. on work nights, with their pulleys and hydraulics running the entire time outside my  bedroom windows.    *   Moving vans, tractors and construction crews parked across my driveway for several hours, as  work takes place in the apartments during the year.    *   Tractors and trailers left parked in front of my home for days in no parking areas, as construction  takes place in the apartments.    *   Devaluation of my home and property, due to all of the above from the existence of apartments  next door to my home, as reported in my last property evaluation.  1458 5 When the City says there will be no impact to existing single family homeowners from new high‐ density residential developments, that is not accurate nor honest, in my opinion and based on my  real life experience.    Best,  Catherine Alexander  http://www.siliconvalleylibrarian.com/    From: Catherine Alexander [mailto:    Sent: Friday, October 10, 2014 4:20 PM  To: George Schroeder  Subject: Re: PS again comments to add to the bulleted list ‐ Cupertino General Plan Amendment and  Housing Element Update ‐ Planning Commission     Since apartments went in next door to my home, I can no longer sleep in my my master  bedroom. I have to sleep in a small bedroom on the other side of my home, due to the  constant car alarms, early morning honking, and car key electronic beeps in the parking area  of the complex, which is directly across their entry lane from the windows of two of the  bedrooms in my home, once of which happens to be my master bedroom.    I hear a steady stream of talking and slamming car doors, if I try to use my own master  bedroom, since apartment residents also park along the lane along my bedroom windows,  and sometimes have prolonged loud conversations near their cars. I have literally been  jolted awake at 1 or 2 a.m., nearly every day of the week, until I gave up and slept in another  room in my house.   Likewise, residents leave their apartment unit windows open at night and crank up their  music and televisions, so it is impossible to use my master bedroom in summer months,  since I hear all of their music, movies and programs.    I am also woken at 6 a.m. on weekdays from apartment noise (I worked some nights on my  job with the County, so this was a real problem), which including slamming car doors,  yelling, and people honking several times directly outside my bedroom windows, while  picking others up at the complex or dropping them off late at night.      Best,  Catherine Alexander  http://www.siliconvalleylibrarian.com/          1459 1 From: George Schroeder [mailto:GeorgeS@cupertino.org] Sent: Monday, October 13, 2014 8:57 AM To: Piu Ghosh; Aarti Shrivastava; Rebecca Tolentino; Terri McCracken; Dan Amsden Subject: Catherine Alexander Comments on GPA/HE - SUPERSEDES OTHERS   Good Morning,    I received these comments from Catherine Alexander over the weekend. and she said to let  these supersede the 2 or 3 others she sent on Friday. Thank you, and see below:  My comments for the GPA hearing record:  In my opinion, new, dense housing complexes will ruin property values for single‐family  homeowners, impact the historic safety of our Cupertino neighborhoods, overcrowd our  struggling schools (adding new stories to existing schools is not a viable solution, since city  streets are already impassible for parents and residents who live near schools) and dense  development of any type will increase traffic and parking problems to more unbearable levels.   Residents who pay property taxes here are already struggling with traffic congestion and parking  at shopping areas, due to downsized parking lots designed to increase acreage available for  development. Many residents now shop and dine in other cities where parking and traffic  congestion is more manageable, as was mentioned more than once by residents during the GPA  hearings, yet was apparently not summarized in the report of overly‐favorable resident  feedback found in the proceeding materials as produced by developer‐paid consultants funded  by interested business owners and the City.  In my opinion, our Cupertino City Council and the current Cupertino Community Development  manager seem to care only about courting and housing local tech employees who bike and walk  to work. Our City Council and Community Development  manager no longer seem to be working  for (nor really considering the interests of) long term and new Cupertino residents who pay their  salaries through taxes, nor residents who own single family homes here who also want to  preserve their quality of life, having made a significant financial investment in our community  and its welfare.   Seniors, residents with small children and those who are disabled are not able to bus, bike or  walk to shops or restaurants in Cupertino. Those physically‐impacted groups seem to have no  place in the City of Cupertino envisioned by the manager of the Cupertino Community  Development team, who seems unwilling to hear any actual opinions and experiences from  residents which differ from her own somewhat rigid futuristic vision and academic theories of  how we "should" want to live here. She repeatedly seems to not hear or acknowledge what  residents have stated they want for Cupertino's future, if those comments and wishes do not  1460 2 agree with her projected models and research statistics, based on popular urban planning  theory.  The Cupertino Community Development manager apparently was part of the team which  created the current traffic and parking mess in downtown Mountain View, all based on the same  bike, pedestrian and public transit theories and statistics she seems to be using now, to envision  the Cupertino she feels would be best for residents.   Some residents have stopped attending public hearings because they don't want any of the  changes planned for Cupertino by its posse of urban planners, consultants and developers.  Residents expressing opposition have been interrupted or cut off at hearings, and some of our  anti‐growth views don't seem to be recorded by the consultants working for stakeholder  developers, business owners and the City, or found in those glossy General Plan Amendment  brochures the City posts online, which residents often can't access or print, due to heavy  graphics usage which eats up home ink cartridges and takes huge chunks of Internet bandwidth  to download.  The Cupertino Community Development manager was apparently one of the city planning team  who created the "new downtown Mountain View," where car travel and parking has become  almost impossible. Mountain View residents, workers and business owners must now purchase  $300 annual parking permits to visit shops and restaurants, to park near jobs, or to park near  their own downtown businesses.   Visitors to downtown Mountain View now attempt to park in front of resident's homes in  residential areas surrounding Castro Street, since the same, "everyone will bike, walk and take  public transit" thinking, apparently from this Cupertino Community Development manager  during her tenure in Mountain View, was used to tell residents what they should want in their  City, based on the same unrealistic statistical models now being used in the City of Cupertino.  Apparently, as a result, vastly inadequate surface road access and poorly planned City‐wide  parking levels, pedestrian safety and access for seniors and the disabled, or families with small  children, have become the new norm in Mountain View, after their downtown was repurposed.  Mountain View residents near Castro Street live in a civic nightmare of continual congestion,  with residents and visitors circling blocks in every direction for nearly 30 minutes most evenings,  just to find one parking spot. This is not safe for families, children, the elderly, or the disabled,  who need safe cross walks and easy parking in front of their own homes, plus easily accessible  parking near Mountain View's Kaiser facility, City Hall, Library, pharmacies, grocery stores and  other shops. One wonders if their stories now appear in the statistical models recalculated or  revised by the City of Mountain View, once the real‐life effects of poor planning became  apparent years later.  1461 3  Cupertino residents do not want to continue to see our City condense itself into a limited  bike/mass transit‐centered future, where every foot of our City is not just developed, but  overdeveloped, and the elderly and disabled, or those with small children, continue to  beforgotten in favor or tech workers' habits and preferences.   Residents do not want our City to become so densely occupied that normal living becomes even  more impossible, due to the already extremely poor City Community Development management  planning used in the location of civic buildings, parks and the parking lots adjacent to them,  notably our Cupertino City Hall, the Library, the Cupertino Community Hall and Memorial Park,  which residents are often unable to access or use, due to the ongoing lack of parking during  events and programs.   Ironically, Cupertino residents are unable to attend civic hearings on the proposed City General  Plan Amendment, because there is such inadequate parking near the combined City Council  Chamber/Community Hall, located between the library and City Hall. The fancy, online City Plan  General Amendment consultant‐produced documents and promotional booklets do not  mention that each public General Plan Amendment‐related hearing has had maybe 2‐5  residents present in recent months, due to inability of residents to park nearby to attend these  meetings, or the fact that some hearings were held during normal 9‐5 business hours, when  most Cupertino residents were either at work or busy with childcare.   There seems to be a sad lack of transparency and honesty in the online General Plan  Amendment documents, since they were produced to push residents towards approving new  high density housing and multiuse developments, and to make it appear that residents were  really behind the move towards new high‐density, when in reality, the same flotilla of  businesses and their developers, consultants and the Chamber of Commerce, seem to really be  behind the move to continually sell out and increase the  density of Cupertino's residential  landscape, continuing to try to turn us into one large, ongoing strip mall like the now ubiquitous  Santana Row model, in hopes that they may make $ millions off of new and existing tech  workers.   Long‐time residents don't want their community to become a series of high‐rise apartment  complexes or condos over businesses, or of shopping areas, parks and libraries which continue  to have completely inadequate parking with shrinking green spaces for residents.    High‐density developments age and degrade over time then look dated and shabby. High‐ density developments are also hard to remove once they are in place (visit the blocks of empty  condos near Target in downtown Sunnyvale, which have remained unoccupied for many, many  years now since they were built, after that City demolished the quaint Town and Country  downtown area for Santana Row‐like "improvements.")   1462 4  The owners of these high‐density multiuse monstrosities most often do not live in the  complexes or the cities where they have been built, so they do not have to deal with the traffic,  health, safety and blight problems they create. Just like in Cupertino, in downtown Sunnyvale,  the Farmers' Markets and street fairs are no longer easily accessible to all residents because  parking and walking distance to fairs and markets has increased, disenfranchising the elderly  and disabled. Close parking that was available previously, was removed in favor or multi‐story  developments through rezoning. And, again, in Sunnyvale, the Target/condos high rise blocks  are ugly and detract from the many well‐maintained bungalows and 1930's‐style historic homes  and buildings, thankfully left untouched in nearby residential streets, which now suffer from  constant commercial transient traffic through formerly quiet neighborhoods. Anyone want to  guess what that has done to the property values of those historic homes now bordering a giant  Target store and parking garage, or several huge nearly abandoned condo complexes?  Protect Cupertino property for those home and business owners who actually live in our City  and who care about its long term quality of life, its history, its safety, its schools, and our  families, seniors, kids and the disabled. Create a balanced City which is not overly focused on  one business, one industry, or one demographic, at the expense of everyone else living in the  City and our quality of life.   Residents with very expensive single family homes moved here expecting their neighborhood to  co‐exist among other family neighborhoods with similar single family homes. They were told  that Cupertino has always had an historic "no‐growth" policy, before they decided to move  here. Those single family home dwellers do not want to be overlooked by apartment and condo  complexes, by multistory garages, or by Santana Row‐like developments. Let's face it, no matter  how many pre‐fab cupolas, vinyl bay windows and fake fiberboard cornices these Santana Row‐ like developments employ, nor how many extruded plastic artificial stucco trellises with newly  planted roses and vines they are decorated with, they are still blatantly fake re‐creations of  historic Victorian and Mediterranean buildings, and look as fake and phony as lipstick on a pig,  as they age over time.   Cupertino demolished (and should have preserved) its own historic buildings, losing what could  have been its own Los Gatos‐like quaint downtown area, sacrificing a planned historic civic  center and  park at the corner of Stevens Creek and Saratoga‐Sunnyvale Road (as it was called  then), trading all of that for pseudo‐Italianate high‐rise condos and a hotel with no parking for  guests, a quasi‐modern yet bland Seagate building at odds with the architecture which  surrounds it (who approved that?), street‐side bistro‐like mini strip malls (again with no  apparent parking visible for customers along a tremendously busy road where no one would  want to sit outside to relax or dine) and a southwest BBQ joint which most health‐conscious  residents don't use near the corner.    The bifurcated Apple headquarters which deep‐sixed the planned historic civic center, is now  being moved to an area boarding Santa Clara. Where have we seen this, "if we built it they will  1463 5 come" development dance before in Cupertino? That's right, when Hewlett Packard, Gemco,  Vallco Park and Seagate developers first came to town. Once again, residents' quality of life,  parks, green space, civic areas, shopping centers and neighborhoods, were on the chopping  block, in trade for the next big financial carrot dangled in front of the City Council as the next  main meal for our City economy, by developers, their PR staff and their consultants, all spinning  their glittering, new bottle of snake oil with a promise to cure all of our civic ills (which were far  fewer than they than are now, by the way).   Since the 1970's, Cupertino's City Council members have chased the development and industry  dollar, believing each large industry du jour was the fiduciary answer for Cupertino. Each new  City Council panel forgets to review how many past major industries have fled Cupertino, failed  or are building elsewhere, whose pre‐development zoning and permitting, promised to be the  answer to Cupertino's future. Even now, Apple is moving to a complex bordering Santa Clara,  and the dated light industry buildings it uses near Bandley Avenue, Lazaneo Avenue, and  Mariani Drive, I predict, will be abandoned in the next 5 years, with no industries filling those  aging office spaces, which will impact our city tax levels and reduce tech employee use of city  area businesses and restaurants.   The lost industries mentioned above, moved away after Cupertino had already destroyed plans  for parks, Civic Centers and museums using historic buildings on those properties, which had  been previously preserved in no‐growth plans to benefit residents and honor our history and  founding residents with a large green space and gathering spaces for residents.    Sadly, we can't bring our historic structures back. Even the historic Cali Brothers Grain Silo,  willed to the City and destined to become a historic civic park monument, since it was beloved  by many here as the town's own Eiffel Tower‐like center when its peak was decorated with  lights and a tree every holiday season, acting as the center of the City in some respects,  somehow was mysteriously destroyed when it was entrusted to the City of Cupertino, after  Apple wanted to develop the corner lot which was earmarked to be our historic civic center park  in the future. Instead, we got Memorial Park, duck poop, drained lagoons, and no place for  residents to park for civic events.   Unfortunately, this "oops, we accidentally destroyed that historic (_Your name here_)" artifact  or structure, or "we accidentally lost it," or "we sold it to someone else," mantra, has been  common in Cupertino over the years, unlike the surrounding cities of Santa Clara, Niles, San  Jose, Saratoga, Los Gatos and Los Altos, which had community development leadership which  understood that preserving history and historic buildings creates tangible civic value, not only in  terms of pride of place with residents and visitors, but in terms of City property values as well.    Cupertino leadership has always been too transient and too focused on the short‐term financial  bump of new industry to realize two simple urban development maxims: 1) historic preservation  adds destination city Gold to local businesses, and 2) apartments, condos and light industry may  1464 6 co‐exist only in designated areas far from historic landmarks, single family residences, and  historic downtown tourism destinations. So, although we could have been awesome, we have  lost any chance of being an historic destination City with a high tech heart, and as a result, have  demeaned the quality of our City life and its essence. We could have been amazing. Instead, our  Council wants to fabricate a phony destination pseudo‐downtown here, there, anywhere, to  replace that which in its infinite wisdom, it chose to tear down for "progress," years ago.   Let's face it, Cupertino has apparently been for sale to the latest developer for many years now,  based on a greed for revenue and the steady posse of Chamber allies, consultants and  developers trying to manipulate City Councils and voters to sell out their own no‐growth best  interests to prop‐up tacky high density projects.    Residents are increasingly disgusted with Community Development management which forgets  to value residential life in favor of pie‐in‐the‐sky theories of utopian living/working/dining  developments favoring pedestrians, bike lanes and mass transit, which almost no resident will  use who isn't employed by Apple or attending De Anza College. Parents, granny's, teens, seniors,  and most adults here, prefer to drive and park close to destinations, it's that simple folks,  despite what urban planning academic thinkers (or developers PR staff)  believe, we drive here,  so a balance has to be found which does not solely court young tech workers.   Want an example? Okay. Let's look at that Mary Avenue Pedestrian Bridge. How much did that  cost? Holy smokes, are you kidding me, that much? Um, but I never see anyone actually using it.  Ever. In theory, with the high school and De Anza at either ends, it should be hopping all day if  people are truly walking and riding bikes at the levels predicted by our Community Development  manager. In theory. Wow, wrong urban planning theories and inaccurate usage statistics can be  really expensive, can't they? Like in $ millions of dollars expensive. The bridge looks kind of  pretty at night, though, I mean, if you look at it like a sculpture or something. Me? No, I've never  used it. You have to park on Homestead and walk behind the high school to get to it, then it  ends up near a mini storage unit on the other side of the freeway‐‐way too to far from  anywhere I'd like to walk and absolutely nothing interesting near by.   Whatever Cupertino could have been, if correctly developed by a City team which respected  our history and environment (refusing civic funding for projects and programs from our greatest  local polluter, Lehigh Cement) and honoring the needs of families, the disabled and seniors  seeking low‐density neighborhoods, shopping areas and parks, all adding to the quality of life for  residents and families, was lost long ago.    Folks, you can't sell phony, high‐density Victorian and pseudo‐Mediterranean architecture to  high tech workers. These workers are highly educated and know the difference between  fiberboard cookie‐cutter condo residential reproductions coated with a stucco effect, which is  why many of them choose to live in Los Gatos, Saratoga, Los Altos and Palo Alto, where actual  historical homes, heritage trees and structures were thoughtfully preserved by those cities and  1465 7 still exist as businesses and single family homes. High density housing in those cities is not  crammed in among heritage single family neighborhoods, but limited to light industrial areas, so  home values and the quality of life in city centers, are not impacted by less desirable combined  high‐rise residential and business developments.   As a Cupertino resident, my single family home, formerly inside an orchard and surrounded by  other orchards, farms and hothouses, was allowed, through re‐zoning and City General Plan  Amendments, to sit adjacent to a huge apartment complex and its entry lane, after our neighbor  sold his orchard land to high density apartment complex developers. At that time, it was the  only apartment complex within blocks of older residential single family homes. It has been  downhill since near my home, due to that apartment complex and its residents.   In what once was a clean and quiet neighborhood of single family homes, my home currently  and over many years has experienced, from that apartment complex next door:   Car alarms at all hours.   Traffic at all hours.   Honking at all hours.   Dogs barking and cats howling and fighting at all hours.   Cats defecating in my back yard at night. (I don't have pets.)   Cats having kittens in my yard.   A dog whose owner, an apartment resident, allowed him to keep urinating on two of my  older roses until they died and nothing would grow where they stood. When I asked him  to please keep the dog out of my yard, he allowed his dog to walk and pee on my  neighbor's landscaping, killing a large area of their groundcover plantings, which had  been healthy, lush and green for many years before this apartment resident and his  uncurbed dog, moved in.   Rats regularly coming under my fence, since the huge industrial‐sized trash bins in the  complex parking area are directly across from my back yard.   Conversations and car key electronic beeping noises at all hours from the cars parked  along the entry lane and in the complex parking garage, which faces the bedroom  windows of my home.   People trespassing and walking under the bedroom windows of my home. (the City will  not allow more than a 3 foot fence to be built near the property line, however there is a  power pole requiring utility access.)   Loitering, running vehicles and parked vehicles in no‐parking areas in front of my home,  with people using cell phones, talking, visiting, eating, smoking, pacing and apparently  having sex in illegally parked cars, at all hours.   People parked across the street from my driveway (in a no parking area) and taking  photos of my home and garage, when I have my garage doors open.   Apartment managers (male) who watched me through their tall shrubs, when I mowed  my lawn or trimmed my plants.   Cigarettes, cigarette butts, food, cups, wrappers, used and unused condoms, used and  unused sanitary napkins/tampons, and other food‐related and personal trash, which is  regularly tossed into my yard and under my 50‐year‐old trees, which I have to clean up.  1466 8  Weeds and quince apples left near apartment complex bushes inside their property line,  which are never removed by apartment yard maintenance workers (I have asked), so I  am left to remove them myself to prevent the spread of seeds/weeds into my yard, or  rodents and pests near, in or under my home.   People regularly smoking near my historic trees without any apparent common sense or  respect for my property or fire safety, flicking their live ashes and butts in my yard under  my mulched large trees (which I am unable to water during the drought).   People also smoking and flicking live ash and butts under dry trees, leaves and needles,  on the state property across the street from my home, creating ongoing neighborhood  fire danger, despite 4 years of my requests asking that the apartment complex create a  smoking area on its own property, to improve chronic littering problems and fire safety  in the neighborhood.   People sitting or talking under the trees in my front yard, without respect to property  boundaries or my privacy.   Workers hired by the complex parking in my driveway to make phone calls and eat  lunch.   Repossession company huge multi‐car, multi‐trailer haulers parking directly across my  driveway (and blocking access to or from my home) as they quietly walk through  apartment complex parking areas to repossess cars from delinquent car buyers, usually  between 11:30 p.m. and 12:30 a.m. on Sunday nights, with their pulleys and hydraulics  running on noisy truck generators outside my bedroom windows.   Moving vans, tractors and construction equipment parked in front of my home for days  or weeks, as work takes place in the apartments during the year.   Tractors and trailers left parked in front of my home for days in no parking areas, as  construction takes place in the apartments. Sometimes the construction engines are hot  and oily and parked under dry neighborhood trees.   Devaluation of my home and property due to all of the above, from the existence of  apartments next door to my single family home.   Loss of use of my home. Since high‐density apartments were built next door to my  home, I can no longer sleep in my master bedroom. I have to sleep in a small bedroom  on the other side of my home, due to the constant car alarms, early morning honking,  late night conversations, and noise in the parking garage of the complex.    Loss of sleep. I hear a steady stream of talking and slamming car doors, if I try to use my  own master bedroom, since apartment residents also park along the  entry lane near my  bedroom windows, and sometimes have prolonged loud conversations near their cars. I  have literally been jolted awake at 1 or 2 a.m. by slamming car doors and trunks, nearly  every day of the week, until I gave up and began sleeping in another room in my house.   Noise at all hours. Likewise, residents leave their apartment unit windows open at night  and crank up their music and televisions during warmer weather, so it is impossible to  use my master bedroom in summer months, since I hear apartment dwellers' music,  movies and programs, and the steady boom, boom, boom of mega‐bass speakers, until  1 or 1:30 a.m. almost every summer weekend night. If I call the Sheriff's office, they  want me to go out there and find out which apartment is making the noise. As a senior  woman, I am unwilling to do that.   Broken sleep. I am also jarred awake at 6:30 a.m. on weekdays from apartment noise (I  regularly worked some consecutive late nights on my job with the County, so this was a  real problem when I had a short turnaround). Noises include slamming car doors,  yelling, and people honking several times directly outside my master bedroom windows  1467 9 to pick up late apartment carpoolers. If apartment carpoolers did not come after one or  two honks, the drivers just keep honking, not thinking that there might be night workers  in the area.   After the two‐story apartments were built, their residents' windows overlooked my  master bedroom, and another bedroom, and my bathroom windows, as well as my front  and back yard. My privacy was completely lost.   Like many Cupertino single family homeowners who have been here for many years, as a  retiree I can't just pack up and sell my home, since I have Prop. 13 property tax relief on my  home, which makes my home affordable on my pension. I am stuck with the mess the City  created with my custom‐designed home when it allowed re‐zoning for high‐density apartment  units next door, practically under my bedroom windows, and reduced not only my quality of life  and ability to sleep in my master bedroom or enjoy my backyard, but the appreciation values on  my home as a result. As I have said, everything has been downhill since the apartments were  built next to me.   When the City says there will be no impact to existing single family homeowners or area schools  from new high‐density multiuse or residential developments near current single family home  neighborhoods, that statement seems neither realistic, accurate, nor honest, based on any of  my real life experience, having had a high density development built next door to my formerly  peaceful and private single family home.   Catherine Alexander  Cupertino, California  Best,  Catherine Alexander  http://www.siliconvalleylibrarian.com/          1468 1469 SAND HILL PROPERTY COMPANY October 13, 2014 Via Overnight Delivery and E-Mail Chair Brophy and Members of the Planning Commission Cupertino City Hall 10300 Torre Avenue Cupertino, CA 95014-3202 Re: General Plan Amendment: Office Allocation for Vallco Shopping District Dear Chair Brophy and Members of the Planning Commission: I am writing on behalf of Sand Hill Property Company ("Sand Hill") regarding the treatment of the V allco Shopping District ("Vall co") in the General Plan Amendment. Sand Hill is in the midst of acquiring the Vall co parcels for potential redevelopment, so we are keenly interested in working with the City of Cupertino ("City") to develop a feasible plan that can benefit all stakeholders. I am writing to request that the Planning Commission recommends to the City Council that the General Plan include an office allocation for Vall co of 2 ,000,000 square feet and the height limits set out in "Alternative C," as analyzed in the draft General Plan's environmental review. Without this specific office allocation, as well as the necessary retail and housing components, there will not be adequate critical mass to make it possible for Sand Hill, or any other prospective developer, to successfully redevelop Vallco. Vall co presents a unique opportunity for redevelopment and revitalization that is unmatched in the City of Cupertino. The site sits at a prime location in the City, yet for many reasons, it has long been neglected and numerous redevelopment efforts were either abandoned or have failed. Sand Hill has the financial capacity and proven track record with such projects and is poised to bring to the City what its citizens have long yearned for: a dynamic downtown where the community can live, work and play. Sand Hill plans to completely transform the current derelict site by redeveloping it with a vibrant, sustainable mixed-use neighborhood. Our plan envisions a balanced mix of 600-700 residential units, approximately 600,000 square feet of retail, a full service hotel , and 2,000,000 square feet of office space. The overarching vision is to create a pedestrian oriented "town center" consistent with the General Plan vision that will have synergies between the uses and nearby projects, such as Main Stree t. sf-3467260 2882 SAND IDLL ROAD, SUITE 241• MENLO PARK, CA 94025 • (650) 344-1500 •FAX (650) 344-0652 1470 Chair Brophy and Members of the Planning Commission October 13, 2014 Page Two The benefits to the City of such a project go well beyond creating a sense of place. With 600,000 square feet, the retail component of the project would be the same size as Santana Row and would generate millions in sales tax revenues way in excess of what is being collected today. Property taxes would also increase significantly, perhaps by 800%, given the billion-dollar plus investment Sand Hill is prepared to make in the City of Cupertino. In addition, we recognize that in order to obtain increased height limits for Vallco under Alternative C, projects must comply with the new General Plan's community benefits program. Although our specific project plans are still developing, the community benefits we anticipate providing include ground floor retail components and [transit improvements and amenities, space for public entities, senior housing, construction of a new, or expansion to, a community facility/community gathering place, creation or dedication of new or expanded park, cash in-lieu contribution for such community benefits]. We would also be amenable to exploring, with other property developers, the potential of providing a community shuttle program in order to provide transportation between employment and community centers. As required by the General Plan, these community benefits will be equivalent to at least 15 percent in value of the parcel attributed to the increase in height. The opportunity to transform the Vall co site is now. Sand Hill has a real plan, the capabilities to implement it, and the history of working closely with the City and the community. Prior attempts at Vallco redevelopment have all run into the same problem: full ownership of the site is needed for a successful project, and the current split and passive ownership structure has made parcel assemblage extremely difficult. After nearly three years of intensive negotiations with the various V allco ownership entities, Sand Hill is now in the process of completing purchases for the entire mall. Single ownership will remove the key barrier to redevelopment that has hampered the site for decades. However, in order to close on the Vallco parcels, Sand Hill needs assurance now that it can build a project that is financially viable. At present, the development allocation recommended in the Staff Report precludes such a project, and thus, a feasible redevelopment of the property. In particular, the StaffReport's recommendations to limit office to 1,000,000 square feet and heights to 75 feet (west of Wolfe Road) and 90 feet (east of Wolfe Road) does not work for our plan, or any plan for that matter. Redevelopment of V allco is a substantial undertaking. It entails demolition of approximately 1.2 million square feet of existing buildings and construction of an entire new downtown over 50 acres. The General Plan's vision for a redeveloped Vallco is ambitious: a ''town center" layout, a newly configured street grid, an expanded Wolfe Road bridge ofl-280 to accommodate a bikeable and walkable "boulevard," a new town square and plazas interspersed throughout. The General Plan calls for high-quality architecture and materials befitting a gateway site. Sand Hill shares this vision, but such elements are all very costly. While retail uses are critical for completing the overall vision, such uses do not support the type of amenities we and the City want to provide. In order for complete redevelopment to sf-3467260 2882 SAND HILL ROAD, SUITE 241• MENLO PARK, CA 94025 • (650) 344-1500 •FAX (650) 344-0652 1471 Chair Brophy and Members ofthe Planning Commission October 13, 2014 Page Three be financially feasible, the project must include 2,000,000 square feet of office already studied in the EIR. Further, in order to provide this office square footage, while also respecting the neighborhoods to the west, increased height must be allowed, including up to 160 feet on the east side of Wolfe Road. For these reasons, we respectfully request that the Planning Commission recommend to the City Council that the General Plan allocate to the Vall co Shopping District: • 2,000,000 square feet of office space; • Include the site in the Housing Element, including at least 600 units of housing; • 600,000 square feet of retail; and • Heights analyzed in "Alternative C" be permitted (i.e., up to 85 feet west of Wolfe Road and up to 160 feet east of Wolfe Road, with community benefits). ****** Sand Hill is proud of what it has done in the City of Cupertino. We have partnered with the City and the community on a number of successful commercial, retail and residential projects since the 1990's. As with those prior projects, we view Vallco as a long-term investment. We are a local owner and take pride in our commitment to the community and the City. Main Street is now under construction and will open as a new gathering place in 2015-2016. We look forward to continued collaboration with the City and community in the redevelopment ofVallco. Sand Hill hopes it can build on its previous successes and realize a long-term community vision for a revitalized V allco. The development team and funding is in place to move forward now. However, we want to be clear with the Planning Commission and City Council that without the necessary office, residential and retail allocations outlined above, we will not be in a position to redevelop Vall co and it will likely continue to languish for decades to come. your consideration. Principal and Founder sf-3467260 2882 SAND IDLL ROAD, SUITE 241• MENLO PARK, CA 94025 • (650) 344-1500 •FAX (650) 344-0652 1472 Chair Brophy and Members of the Planning Commission October 13, 2014 Page Four Sand Hill Property Company cc: Mayor Gilbert Wong Vice Mayor Rod Sinks Councilmember Barry Chang Councilmember Orrin Mahoney Councilmember Mark Santoro David Brandt, City Manager Aarti Shrivastava, Assistant City Manager and Community Development Director Reed Moulds, Sand Hill Property Company sf-3467260 2882 SAND HILL ROAD, SU1TE 241• MENLO PARK, CA 94025 • (650) 344-1500 •FAX (650) 344-0652 1473 14 7 4 14 7 5 From: Darrel Lum [mailto:drlum@pacbell.net] Sent: Thursday, October 16, 2014 2:56 PM To: City Council; City of Cupertino Planning Dept. Cc: David Brandt; Aarti Shrivastava Subject: 2014 General Plan Amendment & Housing Element Concerned Citizens of Cupertino has submitted 2 comprehensive documents of its concerns about the 2014 General Plan Amendment and Housing Element, at the beginning and at the end the Environment Impact Report comment period; since many of the comments were not responded to in the final Environmental Impact Report by your consultants because they were not directly related to the environment, we suggested that you read our comments because they deal with the direct impacts on the City and its residents. A late entry into this discussion is the recent disclosure of the change of ownership of Vallco. The City of Cupertino seems to be having the property owners master plan projects without the input of its residents; has a specific Vallco Specific Plan been discussed yet? 1476 ________________________________________________________________________________________________________ 20863 Stevens Creek Boulevard, Suite 480  Cupertino, CA 95014 Phone: (408) 252-7902  Fax: (408) 252-1233 J. VOLCKMANN & ASSOCIATES, INC. Real Estate Investments and Development October 16, 2014 City Council & Planning Commission of Cupertino: 10300 Torre Avenue Cupertino, CA 95014 We appreciate the substantial efforts of the City of Cupertino and all those that have been involved in the General Plan Amendment & Housing Element over the last year and a half. We feel as if a tremendous amount of thought and work have gone into the process and hope the ultimate decision reflects both what is good for residents/neighborhoods, as well as the city and its economy. For 40 years, our family has owned Stevens Creek Office & Retail Center and been an occupant of the building. We have seen both difficult and prosperous times at the property and have been dedicated to reinvesting and maintaining it to high standards. The property shows well, but as we saw with the Good Earth Restaurant, sometimes preferences change and upgrades must be made (Peets & Panera). We are determined to hold the property in our family for another 40 years, but there will come a time when the property has outlived its useful life and needs to be redeveloped, which we believe to be within the 25 Year Plan. Already, tenant preferences have shifted away from dated buildings such as ours, but we have been fortunate that in prosperous times, Apple has occupied enough of the existing Cupertino real estate that demand remains high. This is not always guaranteed and definitely felt in down markets, which is why we are urging the City to allow for a 60 foot height limit at the site. In today’s market where high ceilings are demanded, this would equate to a four story building and is the lowest height required to make a redevelopment economically feasible. We intentionally did not propose the larger height increases other sites/areas requested and instead focused on what the minimum requirement would be to allow eventual redevelopment. We feel as if our site is well located for a future redevelopment given it sits in the Heart of the City, is bordered to the east by a new retail development and Target, west by Whole Foods, south by Cupertino Crossroads retail center, and north by neighborhood housing, which affects to residents can be mitigated given the depth of the site. Given there is an existing center, it will also allow us to take our time and thoughtfully plan the redevelopment, working with both the city and neighborhoods. Finally, it would make the conversion of the existing office building along Stevens Creek to retail/open space feasible, promoting the Heart of the City Plan and improving the pedestrian environment. 1477 ________________________________________________________________________________________________________ 20863 Stevens Creek Boulevard, Suite 480  Cupertino, CA 95014 Phone: (408) 252-7902  Fax: (408) 252-1233 We absolutely believe in a “Balanced Plan” and respect everyone’s opinions, but given our long term ownership and close involvement in the real estate economy, must think about the future. Limiting future office growth over the next 25 years to 0-500,000 square feet will discourage redevelopment and ultimately companies from staying in or moving to Cupertino, as seen by Amazon’s move to Sunnyvale. Our worry is this could be absorbed by one development, as seen before or with Vallco’s future, eliminating any allocation for long term owners such as ourselves to improve our properties. We are definitely not lobbying for large scale development throughout the city or even massive allocations as seen in other cities throughout Silicon Valley, but a thoughtful approach to growth that will allow certain sites to keep up with the times. Again, we greatly appreciate the thought and consideration that has gone into these initiatives and respectfully ask that you take the above into account. Please do not hesitate to contact us, as we would be more than happy to sit down and further explain our reasoning or answer questions from the community. Regards, STEVENS CREEK OFFICE CENTER ASSOCIATES By: J. Blair Volckmann By: John Volckmann 1478 1479 1480 1481 1482 1483 Resent-From: <GilbertWongDistributionList@cupertino.org> From: "aderidder@juno.com" <aderidder@juno.com> Date: October 24, 2014 at 5:25:16 PM PDT To: <gwong@cupertino.org> Cc: <rsinks@cupertino.org>, <omahoney@cupertino.org>, <msantoro@cupertino.org>, <bchang@cupertino.org> Subject: new developments To: the City council of Cupertino We found a paper on our doorstep about additional developments scheduled to be heard at the November 3rd meeting of the council. We were shocked to hear you would even consider adding another 1451 new residential units to our already burdened infrastructure. We have been warned by an environmental impact report of the monumental traffic problems we would have with the new Apple facility. This was approved after the Main Street development was approved. Add to this the impact of the Rose Bowl development impact and we have a real problem on our hands. One real big problem will be the Hamptons redevelopment. The council approved a massive left turn access from Apple onto Wolfe Road. and Pruneridge Ave will be the only way out of this redevelopment. This will result in a massive headache for anyone who would be foolish enough to live in that development. The development behind Vallco was denied a few years ago as foolish because the only access to the area is via the Vallco parkng lot. I just hope you do not approve this request, but consider a previous council' decision a valid one. Finally, why do we need to demolish a business site and replace it with residences? If that business is not profitable, you should try to find another tenant. This is commercial property and should not be rezoned and cause more impact to our fine city. In closing I would like to remind you that this city is Cuppertino, not San Francisco or downtown San Jose. Please listen to the people and keep Cupertino a place where we have some open space, where we do not feel crowded and we can feel safe. Thank You for reading this whole letter Sincerely Alvin and Shirley De Ridder 19146 Anne Lane Cupertino 1484 1485 Resent‐From:  <GilbertWongDistributionList@cupertino.org<mailto:GilbertWongDistributionList@cupertino.or g>>  From: Urs Mader  <Urs.Mader@maximintegrated.com<mailto:Urs.Mader@maximintegrated.com>>  Date: October 25, 2014 at 10:03:41 AM PDT  To: "gwong@cupertino.org<mailto:gwong@cupertino.org>"  <gwong@cupertino.org<mailto:gwong@cupertino.org>>,  "rsinks@cupertino.org<mailto:rsinks@cupertino.org>"  <rsinks@cupertino.org<mailto:rsinks@cupertino.org>>,  "omahoney@cupertino.org<mailto:omahoney@cupertino.org>"  <omahoney@cupertino.org<mailto:omahoney@cupertino.org>>,  "msantoro@cupertino.org<mailto:msantoro@cupertino.org>"  <msantoro@cupertino.org<mailto:msantoro@cupertino.org>>,  "bchang@cupertino.org<mailto:bchang@cupertino.org>"  <bchang@cupertino.org<mailto:bchang@cupertino.org>>  Subject: Nov 3rd City Council on new Development Units    Dear City Council:    I have known Cupertino since there were still fruit trees along DeAnza and 280 was still being  built.  I have lived here for 14 years.  I am not against development and consider it an inevitable  part of living here.  I think the city needs to become smarter about development to be sure that  developers don’t leave the rest of the city holding the bag once they are done.    Please consider a $500‐$1000 bedroom development fee as condition for allowing these  developments from now on.   This would be to help pay down the new bond debt on the ballot  this election for School Infrastructure.  It is not right that new classroom development is paid for  by all, it should come from those that add more bedrooms to the city.    Traffic Light Synchronization on Wolfe.  A single pedestrian can cause so much havoc and traffic  slowdown and there are more pedestrians in the area with the incoming Apple busses.  I like  that people walk and bike, but the city should be able to do more to make things smoother.    Apple Busses.  They are good, but they are also too aggressive on the road for their size.   Trouble spots for my bike commute on Tantau are the right turn on Valco Parkway and Busses  entering and exiting parking lots on Tantau.  It’s not clear what to do here…  I imagine that there  is trouble in other areas of the city too.  I rarely see these busses filled even through the  darkened windows.  Perhaps it would be good for the city to ask for occupancy on these busses  to see if smaller busses could be used.  They are just too big.    Open up Rodriquez Creek for bikes and joggers.  This will just improve quality of life and actually  do more than just literally paint our streets green.  It will create a good east‐west corridor for  bikes to the city hall/library from the eastern neighborhoods to avoid traffic on Steven’s Creek.  I  have already sent a comment to your bike planner.  I know this requires cross‐agency  coordination.  Please staff that effort with the $$$ you now have.    1486 Also, please consider that Apple may or may not be here in 10 years.  Silicon valley companies  don’t have a good track record once the corporate palace is erected.  All of this newer higher  density housing without regard for quality of life has high risk of creating a long term problem.   Young professionals paying off student loans will be willing to accept noisy neighbors for the  chance to put Apple on their resume, but once the boom town phase is over, it will become low‐ rent or convert from Condo to rent and has the potential for increased trouble if the city is not  careful.  Please be sure the building codes are such that the construction has extra noise  proofing and other higher end construction codes so that what is being built today will also be  desirable down the road even if Apple isn’t here.  Don’t build housing next to freeways; keep  this for office space as a buffer.  Mandate laundry inside the units.  Also mandate children’s play  areas and small parks.  Simple things can make a big difference.  Cheap construction is only  desirable for the first 5‐10 years after which the demographic will slowly change.  At that point  the developer has already made his cash and the city is left dealing with the aftermath.    Developer’s profits conflict with quality housing in the current situation.  It will need a strong  city council to make sure things are done right and I do think the city is watching.  Please be sure  you leave a legacy that you can be proud of.    Urs      Urs Mader  Distinguished Member of Technical Staff IC Design  Office: +1 (408) 601‐5878  Maxim Integrated | www.maximintegrated.com<http://www.maximintegrated.com>    1487 1488 From: Max K. Agoston <mkagoston@msn.com> Date: Mon, Oct 27, 2014 at 10:43 PM Subject: New Developments To: "gwong@cupertino.org" <gwong@cupertino.org> To council member Gilbert Wong: I moved to Cupertino in 1976 and bought my house here in 1981. It was a nice quiet town in those days, but since then I have seen a lot of changes to the city. All the open space is gone and the traffic can be bad at times. Yet the city councils have kept voting for more and more developments. I have watched these developments with disgust but since there is never an option to vote for "none of the above" I have been helpless to prevent the move to make Cupertino into a little "metropolis." Now that there is essentially no more open space, I suppose the next thrust (if not by this council then by future ones) will be to move up and to create more high-rise buildings. I am not a politically active person and have not been involved in Cupertino politics; however, things have gone too far for me to continue watching passively from the byline. I am really fed up. I hope you will REJECT ANY NEW DEVELOPMENT for Cupertino that increases the building density or creates more housing; otherwise, I would very much like to have answers to the following questions: 1. Please tell me who (aside from developers and the planning department who would have less planning to do) is actually clamoring for all this new development? Are these people here for the long term or are they planning to move in a few years hoping to cash in on increases in property values? Maybe all non-trivial changes to the master plans for the city should be put up for an explicit city-wide vote. People do not always have a real choice when voting for council members and just because he/she was elected does not prove that all their favorite development projects were supported. 2. Do you think that traffic has gotten better in recent years? Is there not enough traffic, or do you believe that building more has no effect on traffic, or you do not mind the increase? Stevens Creek Boulevard is getting very congested. Highway 280 is the last good highway on the peninsula, although it also has gotten worse. Do you think that contributing to increasing the traffic congestion on our roads is a price "worth" paying? In election after election candidates have mouthed platitudes about being for "controlled" growth and "managing" traffic congestion. The result of years of such "controlling" and "management" is clear! I can do without it. 3. Do you think that Cupertino is too small population-wise and would you like to have more people move here? Again, who is clamoring for that? 1489 4. Have you given any consideration to people who have lived here a long time and who intend to stay here? Shouldn't they have more to say about what happens than those who are only passing through? What actual percentage of ALL voters in Cupertino have actually supported all the new building over the years? I do not know anybody who wants the city to keep growing and growing. Finally, how do you think that new developments would change the issues raised in the above questions? You probably have heard the statement that an insane person is one who keeps doing the same thing over and over expecting different results. I hope therefore that your response is not going to be that your plans for more development will have no or little bearing on traffic and population. Just exactly who supports your vision of a "greater" Cupertino? It feels like a case of the dog biting the hand that feeds it, in that people are "allowed" to move here and then they take over and screw the long-time residents that were here long before them and will be here long after them. Sometimes the justification that is given for more developments is that the city needs the money that it provides, but why don't we just make do with the money that we have and see what happens. It is said that people want to move here because of our good school system. Let's maintain our schools but we don't need more people moving here. Let's not get into the cycle where spend more money on schools, which has more people moving here, which requires more money for schools, which ... I have always supported our schools in the past and voted for all school bond issues and taxes. I will stop doing that in the future if the need for school money is used as an excuse for more housing and businesses! If new developments raise property values, that is only an issue for those who move here for financial reasons. I want to stay here and could not care less about those who want to make money and then move away, leaving people like me behind with the mess. Thank you for your response, Max K Agoston 19787 La Mar Drive 1490 From: Paul Brophy <pauldbrophy@yahoo.com> Date: October 27, 2014 at 6:22:40 PM PDT To: Gilbert Wong <gwong@cupertino.org>, Barry Chang <bchang@cupertino.org>, Mark Santoro <msantoro@cupertino.org>, Orrin Mahoney <omahoney@cupertino.org>, Rod Sinks <rsinks@cupertino.org> Cc: Aarti Shrivastava <aartis@cupertino.org>, Gary Chao <garyc@cupertino.org>, Winnie Lee <winnieleedds@yahoo.com>, Alan Takahashi <alantcup@gmail.com>, Don Sun <book.sun@gmail.com>, Margaret Gong <margiegong@icloud.com> Subject: General Plan Amendment under consideration Reply-To: Paul Brophy <pauldbrophy@yahoo.com> Dear Mayor Wong and Council members, During the almost seven years that I have been privileged to serve on our Planning Commission, I have always taken the position that I should not lobby Council members on matters that have come before us. The minutes of our meetings and the votes taken should stand by themselves for you to consider when making up your minds on planning and land use items. However, given the importance that possible General Plan Amendment increase in allowable additional office space development would have on the long term quality of life in Cupertino and because my views are at variance with the Planning Department's recommendations, I am writing you today to argue that I strongly believe that no additional office space above that existing in the existing General Plan (540,000 sq. ft.) should be approved. If you believe that is too restrictive, I would urge you not to increase the amount of allowable office space beyond that in Alternative A, which would provide an additional 500,000 sq. ft, for a total of 1,040,000 sq. ft. Alternative A is the compromise amount that was supported by three Commission members (Winnie Lee, Don Sun, and myself), as compared to the staff recommendation of 2,540,000 sq. ft. The EIR for the Housing Element/General Plan Amendment points out that the city already has an excess of jobs above our residential labor force. This is before the Apple 2 campus opens with an additional 14,000 jobs. The Apple 2 EIR was clear in saying that the traffic to be generated by that project would have significant and unavoidable impact upon traffic congestion, despite the tens of millions of dollars that Apple has committed to spending on mitigation measures. The Apple campus was unanimously and enthusiastically approved by both Planning Commission and City Council because we recognized that the benefits for our community from supporting the company's growth outweighed the adverse impacts. It needs to be remembered, though, that we have not yet experienced the increased traffic and congestion from that project. Also there will be an additional 1500 to 2000 employees who will be commuting to the office component of Main Street plus the second office building that will be placed on the IHOP site, immediately adjacent to Cupertino (I am using 4 employees/1000 sq. ft. for this and future calculations). Unhappiness in our community over traffic congestion will only grow just from the projects already in the pipeline. Under our existing General Plan, an additional 540,000 sq. ft. is still available, which would house 2000 employees above all that. If the Alternative A option is approved, we will need to support over 4000 additional employees. And if the Planning Department's "Balanced Plan" preferred alternative of over 2.5 Million additional square feet of allowable office space is approved, the EIR's proposed "mitigation" measures will not begin to address the nightmare traffic conditions on Stevens Creek Blvd, De Anza Blvd., as well as secondary roads such as McClellan, Stelling, Wolfe and Tantau as drivers desperately look for alternatives to gridlocked arterial streets caused by the addition of over 10,000 more employees working here. In a city with lots of vacant land in which to expand both office and residential development, an increase such as that proposed by the Planning Department might well make sense. However, Cupertino is fully built out. Yes, there are some sites that were developed 30, 40, or more years 1491 ago that could be redeveloped at higher densities. However, given that we have limited ability to add residential units (and great concern in the community about the impact of the few units we can add upon school enrollment and increased congestion), allowing substantially more office space means that we will take a city that is already unbalanced as to the relationship between jobs and housing and make it much more so. Let there be no mistake. A vote for adding large amounts of additional office space in our General Plan is a vote against sustainable development. It is a vote that goes against the principles of AB 32 and SB 375 as employees commuting to Cupertino will have to live in distant towns, since the nearby municipalities are also approving large scale office projects without the willingness or ability to approve offsetting homes. Most of all, it will degrade the quality of life in our community that is already stressed by traffic congestion and will be more so just from existing development underway. I would like to end by saying that while I strongly disagree with staff recommendations on this General Plan change that I have treated only with personal and professional respect by Planning Department staff, just as I have been during my entire tenure on the Planning Commission. It has been a pleasure to work with them and occasionally, for us to disagree over various matters before us. The arguments made in favor of permitting far more intensive development than is currently permitted has been echoed by planners and elected officials in many other communities in the Santa Clara Valley and the Peninsula. I believe that they are almost all wrong. I know that they are wrong in the case of Cupertino. Sincerely, Paul Brophy 1492 From: Claire Arnold <clairea_2006@hotmail.com> Date: October 30, 2014 at 12:47:45 PM PDT To: <manager@cupertino.org> Subject: Schools HI There, Could you tell me how space for schools are being fitted into planning for Cupertino? Thanks, Claire Arnold   1493 From: Claudio Bono [mailto:cbono@cghotelgroup.com] Sent: Friday, October 31, 2014 3:06 PM To: Piu Ghosh Subject: Letter to be added for November 10th   Dear Piu;    It was a pleasure meeting you on Wednesday, October 29th 2014. Thank you for taking the time  to meet with me.  As promised, attach, please find the letter/reasoning regarding our request for a 110 Ft height  versus 90 feet.    Please confirm you received this email with attachment and that it will be included on the  November 10th hearing.  Wishing you a great weekend!    Thank you,    Best regards,    Claudio    Claudio Bono  Area General Manager  The Cupertino Inn & The Grand Hotel Sunnyvale  www.Cupertinoinn.com  www.svgrandhotel.com  Tel : 408.996.7700   Cell:305.450.0215    1494            Friday, October 31, 2014    Good Year Tire conversion to Hotel use  This letter contains reasoning to the proposed height and use of the Goodyear site:  The Goodyear site is unique. It is on the transit corridor from Sunnyvale to De Anza  Boulevard or 280 north and south.  So here is the importance of the site to Cupertino:  1.  This hotel site compliments the existing Cupertino Inn so that enough mass of rooms can  support a regional function.  The Cupertino Inn has 128 rooms and the new Hotel at 9 stories  tall has almost 280 rooms allowing for a base of 400 rooms which puts it in the category to  handle regional events and allow Cupertino to received bids on Citywide conventions.  2.  The road system allows transit travelers as well as event guests to not impact the City  Street system for their Hotel arrival, stay, and departure.  Visits to the city of Cupertino  proper are just as is needed or for restaurant use.  3.  The Retail shopping center is complimented by the extra traveler business and this helps  the viability of the retail center.   4.  The property itself has a relatively small foot print so in order to have enough rooms, it  needs to have 9 floors  5.  The Hotel is committed to the entire first floor and one third of the second floor all to  conference event, restaurant and basically all community services of banquet, meeting or  any other event with the rooms to make it work.  We are attempting to make the hotel 5  star and in order to do so in the style it needs to be requires higher plate heights.  The Nine  floors if build as ALoft would be easily under 90 feet but with the great high ceilings of the  first floor and guest rooms with high quality we are asking that the floors be taller.  A limit of  9 stories is more appropriate than a limit of 90 feet.    6.  Floor plans and elevations are available.    1495 From: Claudio Bono <cbono@cghotelgroup.com<mailto:cbono@cghotelgroup.com>>  Date: October 31, 2014 at 6:43:50 PM PDT  To: Piu Ghosh <PiuG@cupertino.org<mailto:PiuG@cupertino.org>>  Subject: Revised attachment    Piu;    I apologize for the revised version but had omitted the conclusion of the email.  In all, we are asking for 108 feet to the top of the parapet screening. 102 to the top of the roof.    Let me know if you have questions.    Thank you;    Claudio    Claudio Bono  Area General Manager  Cupertino Inn & Grand Hotel  www.cupertinoinn.com<http://www.cupertinoinn.com>  www.svgrandhotel.com<http://www.svgrandhotel.com>  Cell :305.450.0215      1496            Friday, October 31, 2014  Good Year Tire conversion to Hotel use  This letter contains reasoning to the proposed height and use of the Goodyear site:  The Goodyear site is unique. It is on the transit corridor from Sunnyvale to De Anza  Boulevard or 280 north and south.  So here is the importance of the site to Cupertino:  1.  This hotel site compliments the existing Cupertino Inn so that enough mass of rooms can  support a regional function.  The Cupertino Inn has 128 rooms and the new Hotel at 9 stories  tall has almost 280 rooms allowing for a base of 400 rooms which puts it in the category to  handle regional events and allow Cupertino to received bids on Citywide conventions.  2.  The road system allows transit travelers as well as event guests to not impact the City  Street system for their Hotel arrival, stay, and departure.  Visits to the city of Cupertino  proper are just as is needed or for restaurant use.  3.  The Retail shopping center is complimented by the extra traveler business and this helps  the viability of the retail center.   4.  The property itself has a relatively small foot print so in order to have enough rooms, it  needs to have 9 floors  5.  The Hotel is committed to the entire first floor and one third of the second floor all to  conference event, restaurant and basically all community services of banquet, meeting or  any other event with the rooms to make it work.  We are attempting to make the hotel 5  star and in order to do so in the style it needs to be requires higher plate heights.  The Nine  floors if build as ALoft would be easily under 90 feet but with the great high ceilings of the  first floor and guest rooms with high quality we are asking that the floors be taller.  A limit of  9 stories is more appropriate than a limit of 90 feet.    6.  Floor plans and elevations are available.    In all, we are asking for 108 feet to the top of the parapet screening. 102 to the top of the  Roof.  Thank you for your consideration.  1497 From: Steve Gazzera [mailto:steve.gazzera@SRSRE.com] Sent: Friday, October 31, 2014 4:04 PM To: Piu Ghosh Cc: 'sgazzera@yahoo.com' (sgazzera@yahoo.com) Subject: 19930-19936 Stevens Creek Blvd. Cupertino   Hi Piu:  Thank for taking the time to meet with me yesterday.  I appreciate it.     At this time,  I would prefer that our site be removed from the Housing Element designation list.     Please contact me should you have any questions.      Thank you.       Stephen P. Gazzera Senior Vice President SRS Real Estate Partners 1871 The Alameda, Suite 250 San Jose, CA 95126 408.216.2319 Direct 408.553.6135 Fax 408.553.0896 | Cell 415.699.5445 DRE #00859021 Steve.Gazzera@srsre.com | www.srsre.com   1498 On Fri, Oct 31, 2014 at 1:38 PM, George Anderl  <george_25056@msn.com<mailto:george_25056@msn.com>> wrote:  already the traffic is awful without Apple and Main Street being open‐‐how  can these   additional cars move on these already clogged roads and where will their kids go to school? I  cant believe you are already planning on more residences and business  when we  already have  full roads full roads and freeway access.  when I moved to cupertino in the 70's, I wanted then  and now  a  nice residential community; not one that would be controlled by developers with  traffic so bad that that one is limited when and where he can go.  I hope that you exercise restraint in further high density development arround stevens creek  and wolf‐‐‐‐I live behind Elephant Bar and am already affected by the traffic increase!      George Anderl      1499 On Fri, Oct 31, 2014 at 12:09 AM, Jialin Song  <jialinsong@gmail.com<mailto:jialinsong@gmail.com>> wrote:  Dear City Councilmen,    We were shocked reading from the letter and Cupertino general planning website that  Cupertino city council are considering approving 600 new residents in Vallco, 1090 new  residents in Hamptons and 103 new residents at United Furniture site, especially, given that this  is on top of current 300+ condo project on Rose Bown and Main street! We strongly oppose the  residential development plan near Wolfe Road for the following reasons.    Cupertino citizens are proud of our good schools. However in rencent years, as we all know, our  elementary, middle and high schools are already overcrowded and the student to teacher ratio  are much higher than before. Our library is always packed with people. Our streets are seeing  more and more daily congestion especially close to the current Apple campus on De Anza and  new Apple II campus on Wolfe Road. The 1800 new residents along Wolfe Road will further  congest Wolfe Road, HW 280 and Stevens Creek. They will also add large number of new  students to the nearby elementary, middle and high schools, which are already seeing  overflows. The new residential development along Wolfe will just make schooling unacceptable  for the existing Cupertino residents.    The residential project may create short term revenue for the City of Cupertino. However, for  the long term, since property tax goes to the county, Cupertino will lose revenue comparing to  making these sites for commercial use. Cupertino citizens are proud of living near the head  quarter of Apple. Other than that, we don't really have very big company, decent downtown,  shopping center, hospitals, medical facilities in our city. We believe it's more beneficial for  Cupertino to develop those site for commercial use and attract more business like great  companies, stores, restaurants and medical clinics and boost long term city revenue.    Please vote NO to the residential development plan.    Thanks very much for your dedicated work for the people of Cupertino.    Sincerely,    Jialin Song and Hongliang Chang    10218 Cold Harbor Ave, Cupertino.            1500 From: <info@cupertinogpa.org<mailto:info@cupertinogpa.org>>  Date: November 1, 2014 at 10:28:22 PM PDT  To: <info@cupertinogpa.org<mailto:info@cupertinogpa.org>>  Subject: Comment from City of Cupertino General Plan Amendment Website  Reply‐To: <info@cupertinogpa.org<mailto:info@cupertinogpa.org>>    Comment Submitted by:     Name: Karen Farrelly   Organization: resident   Email: karenfarrelly@hotmail.com<mailto:karenfarrelly@hotmail.com>    Possibly Regarding Page:     /app_pages/view/10    Subject:     multi unit condos    Comment:     regarding:       The Housing Element     It seems like more and more, that multi‐unit apartments or condos under  construction are  being built very close to main streets with just a  little bit of sidewalk separating the building  from the street. They  also seem very boxy and similar from city to city. The close proximity  to  streets and boxy shape creates a congested or very urban feeling, in  my opinion, and one in  which less sun can make its way down to the  public space. I have seen this with recent  construction on Stevens Creek  in Cupertino and other nearby cities like along El Camino. I wish  there  would be more consideration for more separation between street and new  housing (and  commercial) buildings ‐‐ room where more soft scape can  exist and more natural light can shine  through.    1501 On Sat, Nov 1, 2014 at 3:39 PM, <vtamcupt@sbcglobal.net<mailto:vtamcupt@sbcglobal.net>>  wrote:  Dear Councilman Wong,    I, Virginia Tamblyn, have participated in many meetings regarding the future of Cupertino.  I am  alarmed at the present plans for the future of the city.  If approved, the city will suffer from  overbuilding , congested traffic, and a damage to the quality of life as we know it.  The present  citizens of Cupertino deserve better than this.    The letters in the packet from Apple representatives, and citizens express my concerns.    Sincerely,  Virginia Tamblyn  vtamcupt@sbcglobal.net<mailto:vtamcupt@sbcglobal.net>  19721 Bixby Dr. Cupertino      1502 1503 CITY OF CUPERTINO RECOMMENDATION OF ENVIRONMENTAL REVIEW COMMITTEE October 2, 2014 As provided by the Environmental Assessment Procedure, adopted by the City Council of the City of Cupertino on May 27, 1983, as amended, the following described project wasreviewed by the Environmental Review Committee of the City of Cupertino on October 2, 2014. PROJECT DESCRIPTION AND LOCATION Application No.:EA-2013-03(GPA-2013-01, GPA-2013-02, MCA-2014-01, SPA-2014-01, Z-2013-01) Applicant: City of Cupertino Location: Citywide DISCRETIONARY ACTION REQUEST Certification of Environmental Impact ReportforaGeneral Plan Amendment, Housing Element Update and Associated Rezoning; General Plan Amendmentto establish citywide development allocations for commercial, office, hotel and residential uses and development parameters for key study areas (including the Vallco Shopping district); General Plan Amendment for the 2014-2022 Housing Element as required by State Law; Rezoning of certain parcels in conjunction with the citywide General Plan Amendment; Specific Plan Amendmentto the Heart of the City Specific Plan related to maximum residential yield calculations and an updated map to conform with the General Plan; Municipal Code Amendmentto comply with State Housing Law and the Housing Element of the General Plan and other zoning code amendments for clean-up and consistency FINDINGS OF THE ENVIRONMENTAL REVIEW COMMITTEE The Environmental Review Committeefinds that upon concurrent approval of theGeneral Plan Amendmentsfor the project as outlined in the Draft Environmental Impact Report,the projects(MCA- 2014-01, SPA-2014-01 and Z-2013-01) would be consistent with the General Plan and recommends that the City Councilapprove the Resolution recommending Certification of an Environmental Impact Report (EIR). /s/Aarti Shrivastava Aarti Shrivastava Assistant City Manager g/erc/REC EA-2013-03 1504 -1- Public Comments Related to the General Plan and Housing Element The following is a general list of comments received. Staff comments are provided in italics. • Were respondents on the Community Design Survey residents of the City? – The participants included residents, members of various City Commissions, and property owners. • Photographs in the Community Design Survey should have included more developments in the City, to solicit opinions – The photographs included a number of project types in varying heights and intensities including those in the City. • Based on the number of employees resulting due to increase in office allocations and ABAG requirements, will the City have enough infrastructure; housing, transportation, etc., to accommodate the increase of employees? – The population and housing impacts of the Proposed Project and alternatives are discussed in detail in the EIR and no significant impacts were found. The recommended Balanced Plan provides a balance of land uses, including meeting residential targets in the 2040 Plan Bay Area. It also proposes locating growth near transportation corridors and improving connectivity to reduce transportation impacts. • The Market Study did not provide comparable data for some categories. Also, in the past, mixed-use residential projects have not been approved with enough retail or have not provided the approved amount of retail when constructed – The Market Study data could not provide comparable data for certain years due to a major change in categorization of data at the collection stage. In terms of project approvals, the “mixed-use village” concept in Community Vision 2040 addresses the provision of retail in mixed-use residential projects. • In the past, mixed-use projects have not provided adequate parking – Recent projects, such as Main Street and the Biltmore have improved parking layouts and parking ratios. • Concerns related to schools, parks, etc. with housing projects – State law prevents a jurisdiction from denying a project based on school impacts. The school impact fee is considered adequate mitigation for the impacts of any development. All developments will continue to be required to pay school impact fees, and either dedicate parkland or pay park in-lieu fees, depending on the size and location of the project. • What is the ratio of ownership and rental units? The Housing Element and the Market Study provides this information. It should be noted that parcelization is highly discouraged in major mixed- use corridors to allow redevelopment of key parcels over time. • Good design is essential, particularly for high-density projects – The City has taken a very proactive approach in ensuring the projects are built to high design standards. The project review process also encourages extensive community input. • How are community benefits defined? The proposed Community Benefit Program is discussed in detail earlier in this report. • What is the status of money received for trail and park improvements from Main Street and Apple? The money from projects for trails has been programmed for a future study and improvements, which is expected to begin after the adoption of the General Plan. A Parks and 1505 -2- Recreation Master Plan is proposed to be prepared for the next fiscal year. The Master Plan will identify improvements and land acquisition needed to meet City goals. • There should be a hotel allocation that requires a five-star hotel with 200-250 rooms and 400- person facility for meeting, conference and dining – Per the recommendation, additional height allowed requires a convention center and community benefits in two hotel locations in the City. As part of the project review, additional items can be required. • The Heart of the City will be superseded by the General Plan one year after adoption. There is no Crossroads Streetscape Plan – Amendments to the Heart of the City Specific Plan are related to the Housing Element and the removal of the Vallco Shopping District (which will have its own Specific Plan). No amendments are being proposed to the 35-foot front setback. The Crossroads Streetscape plan and updates to relevant conceptual plans will be conformance action items in the General Plan. • Heart of the City corner lot setback – This is expected to be brought to the Council in Spring 2015. • The South Vallco Area and the Vallco Shopping District should be clearly defined – A clear map and description of all the Planning Areas is provided in the Draft General Plan. • Define the 1:1 and 1:1.5 building setbacks in the General Plan. Are there changes recommended? – Currently, all major corridors require 1:1 have building setback lines with 1:1.5 setback lines required for only a small portion of Stevens Creek Boulevard and Homestead Road (both between Wolfe Road and Tantau Avenue) in the North Vallco and South Vallco areas. These are building plane requirements rather than setbacks, where primary building bulk (except for architectural features and eaves) has to be within the plane. The recommendation is to make all the building plane requirements 1:1 in order to maintain consistency of buildings along all the major corridors. • Provide pedestrian-friendly design and improvements to bicycle and transit infrastructure – This is a part of the “Complete Streets” recommendation in the Draft General Plan. • General comments on study areas and suitability for Housing Element sites. Cupertino residents prefer a suburban lifestyle – The Draft General Plan takes into account the importance of neighborhood preservation, economic and fiscal stability of the City, focusing growth in major transportation corridors, connectivity, and ensuring that an adequate number of sites are identified to meet the City’s RHNA allocation, HCD and other criteria, and affordability requirements. • Provide affordable housing and options for seniors – Recommended in the Draft General Plan and Housing Element. • Specify retail requirements in areas where retail is required for additional height – The Draft General Plan provides additional guidance as it relates to viable retail and substantial amount of retail on the ground floor along the street. • Cupertino needs vibrant retail and places where the community can visit and shop – Recommendations included in the Draft General Plan. 1506 -3- • Don’t specify Green requirements (green roofs, etc.) – The Draft General Plan encourages, but does not require Green elements beyond those required by the City’s Green Building Ordinance and the Building Code. • Community shuttle – This is an element of the Community Benefits Program. • Concerns from Apple related to heights on the Hamptons site – Addressed in the General Plan in conjunction with input from Apple and the Hamptons. • Residential density should not include any rights-of-way – Revised in the Zoning Ordinance and Heart of the City Specific Plan. • The City’s vision and General Plan should direct the design of large projects rather than the at the individual project level – The Draft General Plan provides more guidance on the expectations of projects and the streetscape in order to provide more guidance for individual projects. • General discussion on zoning of industrial sites to residential – Since the 2007-2014 Housing Element was adopted, no such rezoning has occurred. The Draft General Plan clearly outlines Housing Element sites, where residential development would be a permitted use. Residential on mixed-use sites would be conditional uses. • Fiscal impact of rezoning should be discussed – These can be discussed as part of the rezoning. At this time, the only sites that are proposed for residential rezoning are Housing Element sites, which are mandate by the State. Most of these are mixed-use sites, which require a substantial retail component per the Draft General Plan. • In the past, General Plan amendments have been made to allow height exceptions for an apartment building and hotel. Only hotels should be allowed to have the maximum height – Per the recommended heights in the Draft General Plan, no exceptions are allowed. However, base and maximum heights are defined clearly for each area. The tallest heights are reserved only for four areas, two of which are hotels – provided they provide Community Benefits as outlined. • Ensure that projects meet conditions – Noted. Any revisions will be brought to the relevant body for a decision. However, while the City can make a decision on the type and form of the land use and zoning, it cannot make a decision on specific businesses. 1507