Loading...
CC Resolution No. 01-106 RESOLUTION NO. 01-106 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO APPROVING CONTRACT CHANGE ORDER NO. 1 FOR HOMESTEAD ROAD AND TANTAU AVENUE CORRIDORS TRAFFIC SIGNALS UPGRADE, PROJECT NUMBER 9527 AND HOMESTEAD ROAD ARTERIAL MANAGEMENT PROJECT, PHASE II, PROJECT NUMBER 9530 RESOLVED by the City Council of the City of Cupertino, California, that Change Order No. 1 for changes to work which has been approved by the Director of Public Works and this day presented to this Council, be, and it hereby approved in conjunction with the project known as HOMESTEAD ROAD AND TANTAU AVENUE CORRIDORS TRAFFIC SIGNALS UPGRADE, PROJECT NUMBER 9527 AND HOMESTEAD ROAD ARTERIAL MANAGEMENT PROJECT, PHASE II, PROJECT NUMBER 9530 BE IT FURTHER RESOLVED that funds are available and no further appropriation is necessary. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 7 day of May, 2001, by the following vote: Vote Members of the City Council AYES: Bumett, Chang, James, Lowenthal NOES: None ABSENT: None ABSTAIN: None ATTEST: City Clerk APPROVED: CITY OF CUPS �I O Meso 6/-/0� City Hall 10300 Torre Avenue Cupertino, CA 95014-3202 (408) 777-3354 FAX (408) 777-3333 PUBLIC WORKS DEPARTMENT HOMESTEAD ROAD AND TANTAU AVENUE CORRIDORS TRAFFIC SIGNALS UPGRADE, PROJECT NO. 9527 AND HOMESTEAD ROAD ARTERIAL MANAGEMENT PROJECT, PHASE II, PROJECT NO. 9530 CONTRACT CHANGE ORDER NO. 1 Contractor Republic Electric 7120 Redwood Boulevard Novato, CA 94945-4114 The following changes are hereby approved: 1A. Install (2) TS2 Type 1 Signal Controller Cabinets $10,000.00 a. Tantau Avenue & Vallco Parkway b. Tantau Avenue & Pruneridge Avenue 1B. Purchase & install 3 No. 6 pull boxes 1,881.00 1 C. Additional work to sawcut, remove & replace sidewalk 1,074.00 @ Homestead Road & Tantau Avenue $12,955.00 Total Project: Original Contract $39,350.00 Change Order No. 1 12,955.00 Revised Contract 52 305.00 CONTRACTOR CITY OF CUPERTINO Ralph A. Qualls, Jr. Title Director of Public Works Date City Council: May 7, 2001 Resolution No. 01- t` -3 Printed on Recycled Paper CITE' OF CUPEI�TINO AGENDA ITEM SUBJECT AND ISSUE City Hall 10300 Torre Avenue Cupertino, CA 95014-3255 (408) 777-3354 FAX (408) 777-3333 PUBLIC WORKS DEPARTMENT Summary AGENDA DATE May 7, 2001 Resolution No. 01- 10�: Approving Contract Change Order No.l in the amount of $12,955.00 for Homestead Road and Tantau Avenue Corridors Traffic Signals Upgrade Project, Project No. 9527 and Homestead Road Arterial Management Project Phase II Project No. 9530. The adjusted total contract amount is $53,305.00 BACKGROUND On September 20, 2000, the City Council approved a contract for $39,350.00 with Republic Electric for the Homestead Road and Tantau Avenue Corridors Traffic Signals Upgrade Project, Project No. 9527 and Homestead Road Arterial Management Project Phase II Project No. 9530. Originally these projects were bid together to save on time and material costs. These projects include the installation of emergency vehicle preemption units, spread spectrum radio assemblies, and electrical enclosures. Since that time, staff has determined that it is cost effective and time efficient to also install two new traffic signal cabinets along with Projects No. 9527 and No. 9530. Ftuzding for the traffic signal cabinet improvements is in conjunction with the San Tomas Aquino Project. The San Tomas Aquino Project will provide for bicycle paths, routes and lanes and the installation of two traffic signal cabinets, one at Tantau Avenue & Vallco Parkway and a second at Tantau Avenue & Pruneridge Avenue. The price for each traffic signal cabinet installation is $5,000.00. This cost is representative of current competitive pricing for traffic signal cabinet installation. The cost of the installation of the traffic signal cabinets is $10,000.00. Once the work began, the traffic signal tecluiician inspecting the work became aware that there was a need for 3 larger pull boxes at 2 locations, Homestead & Wolfe Roads and Homestead Road & Tantau Avenue. The cost of the larger [No. 6] pull box and its installation is $627.00. Two were installed one at Homestead & Wolfe Roads and another at Homestead Road and Tantau Avenue for a total of $1,254.00. The cost to saw cut and remove sidewalk and to replace the sidewalk for installation of another No. 6 pull box at Homestead Road & Tantau Avenue, is $1,701.00. This work is needed to accommodate all the necessary wiring to finish the work. Printed on Recycled Paper A summary of the above items for the CCO No. 1 is as follows: Item Quantity Price Subtotal No. 6 pull box 3 $627.00 $1,881.00 Remove & install concrete LS $1,074.00 $1,074.00 Traffic signal cabinet 2 $5,000.00 $10,000.00 Total $12,955.00 The total cost of the work for this contract including this proposed change order is: Original Contract $39,350.00 Change Order No. 1 $12,955.00 Revised Contract $52,305.00 STAFF RECOMMENDATION Staff recommends that the City Council adopt Resolution No. 01- 101 , approving Contract Change Order No. 1 for Homestead Road and Tantau Avenue Corridors Traffic Signals Upgrade Project, Project No. 9527 & Homestead Road, Arterial Management Project Phase II Project No. 9530 in the amount of $12,955.00, for total contract amount of $52,305.00. Submitted by: Approved for submission: %a.4 44U. cc U SIL Q. - Ralph A. Qualls, Jr. David W. Knapp Director of Public Works City Manager n _)-