Loading...
14040090 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10396 S STELLING RD CONTRACTOR:SERVICE CHAMPIONS PERMIT NO: 14040090 OWNER'S NAME: DONALD ROSSI TRUSTEE 7020 COMMERCE DR DATE ISSUED:04/15/2014 OWNER'S PHONE: 4082536754 PLEASANTON,CA 94588 PHONE NO:(925)444-4444 I LICENSED CONTRACTOR'S DECLARATIONF BUILDING PERMIT INFO' BLDG ELECT PLUMB License Class Li .it y �U `� r j WAS. M MECH RESIDENTIAL COMMERCIAL Contractor ( S �� T I hereby affirm that I am licensed under the provisions of Chapter 9 JOB DESCRIPTION.REMOVE&REPLACE FURNACE SAME LOCATION (commencing with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the erformance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$7298 ave and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. APN Number:35913124.00 Occupancy Type: APPLICANT CERTIFICATION certify that I have read this application and state that the above information is orrect.I agree to comply with all city and county ordinances and state laws relating PERMIT EXPIRES IF WORK IS NOT STARTED to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save WITHIN 180 DAYS OF PERMIT ISSUANCE OR indemnify and keep harmless the City of Cupertino against liabilities,judgments, 180 DAYS FROM LAST CALLED INSPECTION. costs,and expenses which may accrue against said City in consequence of the granting of this permit. Additionally,the applicant understands and will comply , with all non-point source regulations per the Cupertino Municipal Code,Section Issued by /V / 'C Date: 9 18. Signature Date RE-ROOFS: ❑ OWNER-BUILDER DECLARATION All roofs shall be inspected prior to any roofing material being installed.If a roof is installed without first obtaining an inspection,I agree to remove all new materials for I hereby affirm that I am exempt from the Contractor's License Law for one of inspection. the following two reasons: I,as owner of the property,or my employees with wages as their sole compensation, Signature of Applicant: Date: will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) I,as owner of the property,am exclusively contracting with licensed contractors to ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER construct the project(Sec.7044,Business&Professions Code). I hereby affirm under penalty of perjury one of the following three HAZARDOUS MATERIALS DISCLOSURE declarations: I have read the hazardous materials requirements under Chapter 6.95 of the I have and will maintain a Certificate of Consent to self-insure for Worker's California Health&Safety Code,Sections 25505,25533,and 25534. I will maintain Compensation,as provided for by Section 3700 of the Labor Code,for the compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health& performance of the work for which this permit is issued. Safety Code,Section 25532(a)should I store or handle hazardous material. I have and will maintain Worker's Compensation Insurance,as provided for by Additionally,should I use equipment or devices which emit hazardous air Section 3700 of the Labor Code,for the performance of the work for which this contaminants as defined by the Bay Area Air Quality Management District I will permit is issued. maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the I certify that in the performance of the work for which this permit is issued,I shall Health&Safety Code,Sections 25505,25533,and 25534. not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If,after making this certificate of exemption,I Date: become subject to the Worker's Compensation provisions of the Labor Code,I must IV 11 forthwith comply with such provisions or this permit shall be deemed revoked. CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of work's APPLICANT CERTIFICATION for which this permit is issued(Sec.3097,Civ C.) I certify that I have read this application and state that the above information is Lender's Name correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter Lender's Address upon the above mentioned property for inspection purposes.(We)agree to save indemnify and keep harmless the City of Cupertino against liabilities,judgments, ARCHITECT'S DECLARATION costs,and expenses which may accrue against said City in consequence of the granting of this permit.Additionally,the applicant understands and will comply I understand my plans shall be used as public records. with all non-point source regulations per the Cupertino Municipal Code,Section 9 18. Licensed Professional Signature Date GEHOM. PERMIT APPLICATION MEP _ cotoamf Ty Devemimp'-atum-tc D ou I OM'M R;-:ALM-CUFER ria,CA SW�4-� cUFE1 T�Ato (` 7"�'FAX(AM)?77-3 33- misc Q�Fz n�r� YKMMUMra QM LMCA r 1 � "ms`s owrrrRria G� OSs� o� 25—4.73f� . snuEra�� � nmaca Nd 9sof cora-acr 14aMS sr sannaas C=su'm rL= FAX 0 oanam D GwNm4gmLn IIII � 13 0 El �^m 13r�ravr _ 5 170 YO t Czo -mLmg FAX CMCAWXAME - OW BMMC# AR a4G2iEMXAW. ZNX sT2=rAMC2M5 CCrf.SrA=M IIs- tmnmm-_-.M M=Zme 20 nrra=wo� - Baa v�vwiIDrE .1272 ,ob bdaw,F�tiFgtaraisa�tlre�dfaw%� I�ti��atgo�er� -�IIlaeigt�seawmd�bei�al+"= j�scr�d�s �Y� F� is _��vezah28caF-"Yr tsle���g'�*"�" ��`��fi2��aIicatiicIact a Saari laws -� Dan-- L4-IS r,[ ��ofAgp�A�t' 7 3.IIf3 XWMATM-- $EQUMED apses ts�aiv v PE03 U 0 SLST831titB a 0 LARGE c offn1i11 CITY OF CUPERTINO FEE ESTIMATOR-BUILDING DIVISION ADDRESS: 10396 SOUTH SPELLING ROAD DATE: 04/15/2014 REVIEWED BY: SEAN APN: BP#: -VALUATION: $7,298 *PERMIT TYPE: Mechanical Permit PLAN CHECK TYPE: Alteration /Addition/ Repair PRIMARY SFD or Duplex PENTAMATION FURN/A USE: PERMIT TYPE: WORK REMOVE AND REPLACE FURNACE. SCOPE APPLIANCE/EQUIP TYPE FEE ID QTY UNITS BP FEES Furnace, Forced-Air 1MFR=<100 1 # $139 TOTALS: $139.00 Mech.Plan Check 0.0 hrs $0.00 Phunb. Plum(' e'c n' Mech.Permit Fee: IMPERMIT Plum/p. Ptrrrsf Other Mech.Insp. 0.0 hrs $47.00 Otiwr Pluinb Insp. Phrwh. Ins p.Fee: Ekl ( Insl). 1ce: NOTE. This estimate does not include fees due to other Departments(Le.Planning,Public Works,Fire,Sanitary Sewer District,School District,etc). These ees are based on the prelimina information available and are only an estimate Contact the Dept./or addn'1 info. FEE ITEMS aW Resolution 11-053 M.' 7/1/13 FEE QTY/FEE MISC ITEMS Man C"h ecl: ["cep: Slplpl, PC Fee PME Plan Check: $0.00 PME Unit Fee: $139.00 PME Permit Fee: -FT $47.00 Administrative Fee: IADMIN $44.00 Work Without Permit? 0 Yes (F) No $0.00 Travel Documentation Fee: ITRAVDOC $47.00 Strong Motion Fee: IBSEISMICR $0.73 Select an Administrative Item Bldg*Stds Commission Fee: IBCBSC $1.00 r $278.73 $0.00 TOTAL FEE: $278.73 Revised: 04/01/2014 HVAC ALTERATIONS ENERGY COMPLIANCE FORM COMMUNITY DEVELOPMENT DEPARTMENT• BUILDING DIVISION ALBERT SALVADOR, P.E., C.B.O.,BUILDING OFFICIAL 10300 TORRE AVENUE•CUPERTINO,CA 95014-3255 GUPERTtNO (408)777-3228•FAX(408)777-3333•buildinae-cupertino.org WHEN IS A PERMIT REQUIRED A construction permit shall be obtained from the enforcement agency prior to the erection, construction, reconstruction, installation,relocation, or alteration of any mechanical system, except as permitted in Chapter 1,_Section 112.2 of the 2010 California Mechanical Code. Projects requiring permits include, but are not limited to: • New HVAC installation • HVAC Changeout • Replacement of furnace, coil,FAU or condenser ? • Relocation of an existing HVAC unit • Adding or replacing more than 40ft ducting in unconditioned space BUSINESS AND PROFESSIONS CODE,SECTION 7110 Willful or deliberate disregard and violation of the building laws, including the California Building Code, and local permit requirements constitutes a cause for disciplinary action from the Contractors State License Board working in conjunction with the local building department. This action may consist of fines up to $5,000 per violation or suspension/revocation of a contractor's license. 2008 BUILDING ENERGY EFFICIENCY STANDARDS (Title 24,Part 6)REQUIREMENTS INCLUDE: 1. Heating equipment must have a minimum 78%AFUE(Exception: Wall &floor furnaces; room heaters). 2. Central air conditioners &heat pumps less than 65,000 Btu/hr must have a minimum 13 SEER. 3. Newly installed or replaced ducts must have a minimum insulation value of R-4.2. 4. A setback type thermostat(24 hr clock with four set points) is required for all alterations. 5. New or replacement ducts must meet the mandatory requirement of Section 150(m). • All joints and openings in the HVAC system must be sealed. • Only UL 181, UL 181A, or UL 181B approved tapes or mastic shall be used to seal duct openings. • Connections of metal ducts and the inner core of flex ducts shall.be mechanically fastened. Flex ducts must be connected using a metal sleeve/coupling. • Flex ducts that are suspended must be supported every 4 ft. max for horizontal runs with no more than 2" of sag between supports and 6 ft. max for vertical runs. 6. The CF-6R-MECH-04 must be completed and signed by the installing contractor. The Inspector will collect this form and verify that the model numbers are the same as the installed equipment. 2008 Residential Compliance Fornns.doc revised 04/10/12 Fr. SimpMed Prescriptive Certificate of Compliance:2008 Res1deYi1W EVACAIferatinus.. CF-IR-ALT-HVAC C#iniate Zona 1 and 3-7 She Addresa: � EiiforcesnersiAgency: 3Jure ".= Perrrrit:# Conditioned Duct insulation ent T m I3st°1.frnimuien" floor Aiea " ,-r Over 40 of dans Pac]zaged Ufut Furnace AFLTE COP Serued by system added of replaced m + etback Indoor Coll ( S IIt HSPF ofareadppre=9mustbe sf' unconditioned spaces,- . Condensing Unit E3 EER Resistance msttrltei�J` z •- ®R 6 (CZ I,3-3) Other 1.Equipment Type.Choose the equipment being installed;if mom than one_system,use another CF-IR-ALT-HVAC for each system. 2.Alinimum Equipment 1£ficiracies:13 SEER,78%AFUE,7.7HSPF for typical residential:systems. Contractor(Documentation Author's/Responsible Designer's Dedaration Statement) • I certify that this Certificate of Compliance documentation is accurate and eons ilete. • I am eligible under Un inion 3 of the California Business and Professions Code to accept responsibility for,the design identified on this Certificate of Compliance. • I certify that the energy features and performance.specifications for the design identified on t3tis Certificate of Compliance conform to the requirements of Title 24,Parts I and 6 of the California Code of Regulations. • The design features identified on this Certificate of Compliance are consistent with the information documented on other applicable compliance forms,worksheets,calculations,plans and specifications submitted to the orcement agency for approi:al with the peunit application. Name: IKO S Sim: Company ` ate Address Lte: 91 7C��CJ City/State)zip: fj Phone: 2008 Residential Compliance Forms.doc revised 04/10/12