Loading...
CC Resolution No. 14-122 Final refinements of associated site and landscaping design of Main StreetRESOLUTION NO. 14 -122 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO FOR FINAL REFINEMENTS TO THE PREVIOUSLY APPROVED SHOPS 1, SHOPS 3-5,7-8, PADS 1& 2, TOWN SQUARE, FLEX 1 & 2, OFFICE 1 & 2, PARKING GARAGE, AND ASSOCIATED SITE AND LANDSCAPING'DESIGN OF MAIN STREET CUPERTINO (ASA- 2012 -15) SECTION I: PROTECT DESCRIPTION Application No.: ASA - 2012 -15 Applicant: Kevin Dare Property Owner: Main Street Cupertino Aggregator, LLC Location: North side of Stevens Creek Boulevard on both sides of Finch Avenue, west of N. Tantau Avenue and south of Vallco Parkway (APN 316 -20 -078, 316 -20 -079, and 316 -20 -085) SECTION II: FINDINGS FOR ARCHITECTURAL AND SITE APPROVAL: WHEREAS, the City Council of the City of Cupertino received an application for site modifications to a previously approved Development Permit as described in Section I. of .this Resolution; and WHEREAS, the necessary public notices have been given as required by the Procedural Ordinance of the City of Cupertino, and the City. Council has held at least one public hearing in regard to the application; and WHEREAS, the applicant has met thE, burden of proof required to support said application; and WHEREAS, the City Council finds as follows with regard to this application: 1. The proposal; at the proposed location, will not be detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience, The project impacts to the public health., safety, general welfare and surrounding improvements have been analyzed as part of an Environmental Impact Report under the California Environmental Quality Act. In response to areas where impacts were anticipated, a Mitigation Monitoring and Reporting Program had been established to minimize the impacts to less than significant levels. The project shall be required to continue to abide by these specified mitigation measures as enforced by City staff. Resolution No. 14 -122 Page 2 Furthermore, the project is anticipated to enhance the general public convenience in the area in that it provides a rich mixture of land uses that accommodate housing, shopping, and employment centers. New pedestrian connections to the Rosebowl and Metropolitan developments to the west shall be made, and the entire sidewalk /streetscape surrounding the perimeter of the site shall be replaced and enhanced. 2. The proposal is consistent with the purposes of Chapter 19.168, Architectural and Site Review, of the Cupertino Municipal Code, the General Plan, any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including; but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings; On every edge and frontage, the proposed buildings mirror their surroundings creating a complementary and logical neighborhood transition. No substantial building mass or height changes are being proposed from the previous Council approval. b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new buildings should harmonize with adjacent development by being consistent or compatible with design and color schemes, and with the fixture character of the neighborhood and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate .to meet safety requirements as specified by the engineering and building departments, and provide shielding to prevent spill- over light to adjoining property owners; and The project present a combination of flat and sloped roof building designs, earth tone colors, and associated landscaping are harmonious with the adjoining buildings and streetscape on Stevens Creek Boulevard, Vallco Parkway, and N. Tantau ' Avenue streetscapes. The rich palette of materials /textures is compatible with the recently approved Rosebowl Development and design guidelines contained in the Heart of the City Specific Plan. All above ground utility installations are required to be screened from public view through a combination of landscaping and screen walls. As shown in the project photometric plans, the proposed lighting adequately serves to illuminate pedestrian paths and vehicular routes, and as conditioned shall be adequately down shielded to prevent spill- over light and glare to adjoining properties. Resolution No. 1.4 -122 Page 3 pedestrian paths and vehicular routes, and as conditioned shall be adequately down shielded to prevent spill- over light and glare to adjoining properties. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures shall minimize traffic hazards and shall positively affect the general appearance of the neighborhood and harmonize with adjacent development. The project signage shall be separately reviewed and approved as part of a Master Sign Program. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures The proposed land use, building height, and building setbacks have been previously approved by the City Council. The proposed landscaping features and vegetations will provide adequate screening and buffering; from the streets and adjacent uses. Please also refer to 2a. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on Page 2 thereof,: 1. The application for Architectural and Site Approval, Application no. ASA- 2012 -15 is hereby approved, and That the subconclusions upon which the findings and conditions specified in this Resolution are based and contained in the Public Hearing record concerning Application no. ASA - 2012 -15 as set forth in the Minutes of City Council Meeting of February 25, 2014, and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT. Planning Division: 1. APPROVED EXHIBITS Approval is based on the plan set entitled, "Main Street Cupertino" drawn by Kenneth A. Rodrigues (Kenneth Rodrigues and Partners) and Gary D. Laymon (Guzzardo Partnership) stamped as received January 24, 2014 with the new revised elevations received on February 6, 2014, except as may be amended by conditions in this resolution. 2. ACCURACY OF PROTECT PLANS Resolution No. 14 -122 Page 4 The applicant /property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and /or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. PREVIOUS CONDITIONS OF APPROVAL All prior Development Permit and Architectural and Site Approval conditions of approval in Resolution No. 12- 098(M)) and prior conditions of approval through past approvals shall remain in effect unless superseded by or in conflict with subsequent conditions of approval, including conditions of approval for ASA- 2012 -15. 4. ADDITIONAL COUNCIL APPROVAL The remaining buildings (Loft Apartments, Shops 2, 6 & 9, Major Retail Building) shall return to the, City Council for final architectural and site approval. 5. CONSTRUCTION PLAN SET REVISIONS Prior to issuance of building permits, the applicant shall be required to make the necessary changes to the project (i.e. landscaping features, street /sidewalk design, utilities, and /or other similar site features) in order to be consistent with the approved plans to the satisfaction of the Director of Community Development. 6. FINAL TRASH ENCLOSURE / GENERATOR DESIGNS The final trash enclosure and generator design, including, but not limited to size, colors, materials, layout and architectural treatments shall be reviewed and approved by the Director of Community Development and Director of Public Works prior to issuance of building permits. All trash enclosures shall be property screened by landscaping or decorative architectural features from public view. All generators shall be setback a minimum of four (4) feet from a pedestrian path of travel, or a distance determined to be appropriate by the Director of Community Development. 7. ONSITE UTILITIES The final transformer, FDC, water, including, but not limited to size, colors, materials, and architectural treatments shall be reviewed and approved by the Director of Community Development and Director of Public Works prior to issuance of building permits. 8. PEDESTRIAN GATEWAY FEATURES A pedestrian gateway feature shall be required between Shops 2 and Shops 3, and between the Flex. Retail and Hotel buildings. Final gateway designs shall be reviewed and approved by the Director of Community Development prior, to issuance of building permits. 9. RAILINGS, STAIRS, RETAINING WALLS & FENCING - T � Resolution No. 14 -122 Page 5 Prior to issuance of building permits, final design of pedestrian railings, stairs, retaining walls and fencing shall be reviewed and approved by the Director of Community Development. 10. DEMISING WALLS Prior to issuance of building permits, the division of retail tenant space shall be consistent with the Tenanting Plan and subject to review and approval by the Director of Community Development. The alignment of demising walls between tenant spaces shall correlate to prominent exterior architectural features unless otherwise approved by the Director. 11. ROOF MATERIALS Prior to issuance of building permits, the applicant shall revise the proposed roofing material on buildings 1, 3, 4 and the clock tower to reflect a variegated slate material similar to the Chinese multicolor slate or other similar multi -color slate material. 12. BUILDING MATERIALS Prior to issuance of building permits, the applicant shall revise material #18 (Ceramic Tile - Alta Vista Daltile or Equivalent) on the Material Board (Sheet MB -1), and as it occurs throughout the project plans, with higher quality stone or equivalent side material to the satisfaction of' the Director of Community Development. The stone siding used on Shops 1 shall match or be similar to the stone sidings on Buildings 3 & 4 for continuity and consistency. Furthermore the exterior finish of the Office 1 & 2 buildings shall be a smooth plaster (non - .sprayed finish) similar to the treatment of the Netflix buildings in Los Gatos to the satisfaction of the Director of Community Development. 13. FLEX BUILDINGS The final architectural drawings shall reflect the following changes to the Flex Buildings to the satisfaction of the Community Development Director: • Utilize the original Art Deco Farmer's Market building design on the Flex 1 building • Work with staff to introduce warmer colors /tones to the Flex Buildings • Utilize either ipe or corrugated metal /aluminum decorative building accents 14. WINDOWS DETAILS Prior to the issuance of building permits, the final window details on the new monitor roof system on building 3 & 4 shall be reviewed and approved by the Director of Community Development. 15. PARKING STRUCTURE Prior to issuance of building permits, the applicant shall work with staff to submit a final garage plan to demonstrate the following changes to the satisfaction of the Director of Community Development: Resolution No. 14 -122 Page 6 • Demonstrate compliance with the 60' maximum height limit as measured from the sidewalk along Vallco Parkway. • Provide additional decorative detailings to the garage to make it less garage like, including possible green screens or other appropriate architectural features as deemed appropriate by the Director of Community Development. • Incorporate additional decorative siding material to the ground floor concrete crash wall. • A more decorative (with custom patterns /details) metal railing design within openings on the stair tower and along the perimeter of the roof level. 16. SHOPS 3 & 4 Prior to issuance of building permits, the final monitor window details on Shops 3 & 4 shall reflect the design theme of the building. 17. ADDITIONAL ARCHITECTURAL ENHANCEMENTS Prior to issuance of building permits, the applicant shall have the option to work with staff and the City Consulting Architect on incorporating decorative iron lighting features on the columns for the Shops 3 & 4 buildings along the Stevens Creek Boulevard frontage. 18. LIGHTING Lighting in the parking lots shall be approved by the Director of Community Development for compliance with applicable regulations prior to issuance of building permits. All lighting shall be adequately downshielded. 19. SIGNAGE Signage is not approved with this application. Signage shall conform to the City's Sign Ordinance, Heart of the City Specific Plan and South Vallco Master Plan. Prior to final occupancy and approval of any individual signs on site, a detailed master sign program shall be submitted for review and approval in accordance with the City's Sign Ordinance. 20. GATEWAY ENTRY The applicant shall be required to construct and install a gateway entry feature on the northwest corner of Stevens Creek Boulevard and N. Tantau Avenue that will be consistent with the policies of the General Plan and South Vallco Master Plan. The gateway entry feature shall be a prominent design that may fulfill the public art requirement and could include a decorative monument feature that spans over Stevens Creek Boulevard, or vertical structural elements on both sides of Stevens Creek Boulevard and on the median to announce entry. Also, this corner shall include a community banner and enhanced pedestrian crossings that may include crosswalk lighting, special paving materials and /or prominent art or architectural feature announcing the entry to the City, such as a wrought iron element, subject to review and approval by the City Council. Resolution No. 14 -122 Page 7 21. SCREENING All mechanical and other equipment on the buildings and site shall be screened so they are not visible from public street areas or adjoining developments. Screening- materials /colors shall match building features and materials. The height of the screening shall be taller than the height of the mechanical equipment tlnat it is designed to screen. The location of equipment and necessary screening shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. 22. UTILITY STRUCTURES All new utility structures, not otherwise provided for on the plans, shall be located underground. Where utility structures are not capable of being undergrounded, for reasons other than cost, they shall be screened from public view to the satisfaction of the Director of Community Development and Public Works. 23. EXTERIOR BUILDING MATERIALS /TREATMENTS The final building exterior treatment plan (including but not limited to details on exterior color, material, architectural treatments anal /or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The final building exterior plan shall closely resemble the details shown on the original approved plans, except as otherwise approved by the Director. The Director of Community Development has the ability to require additional public review process for changes or alternations that are deemed to be significant. 24. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and /or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 25. NOTICE OF FEES, DEDICATIONS, RESERVATIONS, OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. ,You are hereby further notified that the 90 -day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protE�st within this 90 -day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. Resolution No. 14 -122 Page 8 PASSED AND ADOPTED this 25th day of February, 2014, at a Special Meeting of the City Council of the City of Cupertino, State of California, by the following roll call vote: AYES: Wong, Sinks, Chang, Santoro, Mahoney NOES: None ABSTAIN: None ABSENT: None ATTEST: �'J+ Grace Schmidt City Clerk APPROVED: ^ti/ Gilbert Wong, Mayor City of Cupertino