Loading...
12020109 SIV CONSTRUCTION TESTING SERVICES March 4, 2013 City of Cupertino 10300 Torre Ave. Cupertino, CA 95014-3255 Job No: J8359 Summary Report #20 • TESTING • INSPECTION • ENGINEERING R�CEy�ED MAR 112013 Names 2118 Rheem Drive, Pleasanton, CA 94588 & Phone (925) 462-5151 0 Fax (925) 462-5183 4770 Duckhorn Drive, Sacramento, CA 95834 a Phone (916) 419-4747 • Fax (916) 419-4774 One Embarcadero Center, Suite 535, San Francisco, CA 94111 • Phone (415) 438-2357 0 Fax (415) 3344747 246 30th St., Suite 101, Oakland, CA 94601 0 Phone (510) 444-4747 • Fax (510) 835-1825 i CONSTRUCTION TESTING SERVICES March 4, 2013 Summary Report #20 Apple, Inc. 1 Infinite Loop Cupertino, CA 95104 Job No: J8359 Job Name: Apple Campus 2 Mock -Up 10520 Ridgeview Court Cupertino, CA A Permit #: 12020109 _ March 1, 2013 • TESTING • INSPECTION • ENGINEERING Jared Byers reported to Elias with DPR at the jobsite. Observed placement of concrete (mix no. 28013803, 28-day strength of 6000 psi, specified slump of 7±1 inch, 130 total cubic yards placed) for pony walls D-G/1 and D-G/3. Monitored loads for mix no., slump, temperature and time limit. Prepared cylinder test specimens sampled from truck mixer. Set 1 Slump (in-) 71/4 Mix temp. (OF) 72 Air temp. (OF) 60 Truck No. 1610 Location Truck 10 Per Set, 1 Set, 1U Total Work observed was, to the best of Jared's knowledge, in conformance with approved plans, specifications and applicable standards of workmanship. 2118 Rheem Drive, Pleasanton, CA 94588 • 4770 Duckhorn Drive, Sacramento, CA 95834. • One Embarcadero Center, Suite 535, San Francisco, CA 94111 • 246 30t' St., Suite 101, Oakland, CA 94601 0 Phone (925) 462-5151 0 Fax (925) 462-5183 Phone (916) 419-4747 • Fax (916) 419-4774 Phone (415) 438-2357 0 Fax (415) 334-4747 Phone (510) 444-4747 0 Fax (510) 835-1825 - CONSTRUCTION TESTING SERVICES • TESTING • INSPECTION • ENGINEERING Laboratory test results are enclosed if testing was done during the period covered by this report. Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. �. 3/5/2013 viewed by Andy Malone E.I.T. Date Staff Engineer Technical Contact: Timothy Casey Senior Engineer (tcasey@cts-Lcom) Administrative Contact: Yolanda Deras (hderas@cts-l.cmn) cc: Building Department — City of Cupertino Contractor — DPR/Skanska N (email) Architect — Foster & Partners Limited (email) Structural Engineer — Ove ARUP & Partners (email) CTS PM's — Jim Doyle & Aaren McBride (email) CTS Staff Engineer — Jon Felts (email) BC 2118 Rheem Drive, Pleasanton, CA 94588 0 Phone (925) 462-5151 Fax (925) 462-5183 4770 Duckhorn Drive, Sacramento, CA 95834 • Phone (916) 419-4747 • Fax (916) 4194774 One Embarcadero Center, Suite 535, San Francisco, CA 94111 • Phone (415) 438 2357 Fax (415) 334-4747 246 30�'' St., Suite 101, Oakland, CA 94601 Phone (510) 444-4747 Fax (510) 835-1825 CONSTRUCTION TESTING SERVICE it,ovantt�,n;2:5.ax2.51�--s acrarnc-iic• 1&415:/-74 :ar e r!ciL r 41-533 -,7A7 etc, kJcn , 4 Sa:?7` 5 Lo a .E . D2,2 1.. 4,r -: r 0.44,4.4 Z7 Field Number. 10 Laboratory Compression Test Project Name: Apple Campus 2 Mock -Up Appl No: 12020109 Project No.: J8359 Sampled By: Ramon Carrillo Report Date: 03/04/2013 Client: Apple Inc. Date of Sampling: 02/21/2013 Lab Log No.: 77095 Information provided by Field Technician Mix #: 280138D3 Supplier: Central Contractor: DPR Set: 1 of 1 ITruck #: 1602 Design Strength (psi): 6,000 @ 28 days Sample Material/Shape: Concrete Cylinders Location: Onsite Location for overall D-G / 2 pour: Type of Structure: Wall Location G / 2, pony wall when sampled: Concrete Quality Actual Mix Temperature (°F): 68 Air Temperature (°F): 62 Aggregate Size (in): 3/8, #8 Req'ment 50-90 >40 N/A Actual Slump (in.): 6 Air Content (%): N/A Time Batched: 11:19 am Req'ment Actual 7 +/- 1 Unit Weight (pcf : N/A N/A Time Sampled: 12:30 pm N/A Time in Truck: 71 mins Req'ment N/A N/A <90 Mins. Information supplied by Laboratory Technician Date Received: 02/22/2013 Technician that received: CH Test # Age of Test (Days) Date Technician Dimensions (inch) XSection Ultimate Load (Ibs) Compressive Strength (psi) Type of Fracture Diameter Length Area (W) A 4 02/25/13 AP 6.00 12,00 28.27 101,310 3,580 3 B 5 02/26/13 AP 6.00 12.00 28.27 106,460 3,770 3 C 5 02/26/13 AP 6.00 12.00 28.27 111,840 3,960 3 D 7 02/28/13 AP 6.00 12.00 28.27 118,690 4,200 3 E 7 02/28/13 AP 6.00 12.00 28.27 128,140 4,530 3 F 28 03/21/13 6.00 12.00 28.27 G 28 03/21/13 6.00 12.00 28.27 H H I H J H 28 Day Avg.: Reviewed by: Emily Stronks - Staff Engineer 03/04/2013 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231 or C173, C470, C511, C617, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Fracture Key: 1. Well -formed cones on both ends 3. Columnar vertical cracking through both ends 5. Side fractures at top or bottom 2 Well formed cone on one end 14. Diagonal fracture with no cracldng through ends 16. Similar to Type 5 but end of cylinder is pointed Testing was performed by qualified personnel in accordance with generally accepted industry practice, marenai resung consunenus ptucza — ally Flu a , — o,o— . .. — . e •- applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited. . ` CONSTRUCTION La TESTING SERVICES ',OA�'W.CT1S-1,CO °lecs�:rll�r� 72S.ar'` `15�. So rm c'n I� r. 41 ro 4.11747 So m Jose 4Ga,5l,3092 Field Number: 4 Laboratory Compression Test Project Name: Apple Campus 2 Mock -Up Appl No: 12020109 Project No.: J8359 Sampled By: Ramon Carrillo Report Date: 03/01/2013 Client: Apple Inc. Date of Sampling: 02/01/2013 Lab Log No.: 76358 information provided by Field Technician Mix #: 440BP5Q1 Supplier: Central Contractor: BPR Set: 1 of 1 ITruck #: 1618 Design Strength (psi): 4,000 @ 28 days Sample Material/Shape: Concrete Cylinders Type of Structure: Footings Location: Onsite Location for overall Footings G-D/1-3 pour: Location E/3 when sampled: Concrete Quality Actual Mix Temperature (°F): 58 Req'ment 50-90 Actual Slump (in.): 4.5 Req'ment 4 +H 1 Actual Unit Weight (pcf : N/A Req'ment N/A Air Temperature (°F): 56 >40 Air Content (%): NIA N/A Time Sampled: 7:35 am N/A Aggregate Size (in): 3/4/#67 N/A Time Batched: 6:33 am N/A Time in Truck: 62 mins <90 Mins. Information supplied by Laboratory Technician Date Received: 02/02/2013 Technician that received: TW Test # 1 Age of Test (Days) Date Technician Dimensions (inch) XSection Ultimate Load (Ibs) Compressive Strength (psi) Type of Fracture Diameter Length Area (in2) A 7 02/08/13 AP 6.00 12.00 28.27 59,040 2,090 3 B 28 03/01/13 AP 6.00 12.00 28.27 141,620 5,010 3 C 28 03/01/13 AP 6.00 12.00 28.27 148,090 5,240 3 D H Remarks: 2/11 7-day result reported to distribution- JF MEETS DESIGN STRENGTH 28 Day Avg.: 1 5,120 Reviewed by: Emily Stronks - Staff Engineer 03/01 /2013 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231 or C173, C470, C511, C617, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Fracture Key: 1 Well -formed cones on both ends 13. Columnar vertical cracking through both ends 15. Side fractures at top or bottom 2 Well -formed cone on one end 4 Diagonal fracture with no cracking through ends 16. Similar to Type 5 but end of cylinder is pointed Testing was performed by qualified personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited. CONSTRUCTION TESTING SERVICES w"+r w. ls- LCOI"i"I pi�3c..Ar.rff a17�a'`.a.,m.Sl 5un J ,se 1311' —5e,992 1c>i:;� ,d 510 .44,1,41, 7 Sccrorniento 9 16,415'_474- WEr La - Field Number: 4 Laboratory Compression Test Project Name: Apple Campus 2 Mock -Up Appl No: 12020109 Project No.: J8359 Sampled By: Ramon Carrillo Report Date: 03/01/2013 Client: Apple Inc. Date of Sampling: 02/01/2013 Lab Log No.: 76356 Information provided by Field Technician Mix #: 440PB5b1 Supplier: Central Contractor. BPR Const Set: 1 of 1 ITruck #:' 1630 Design Strength (psi): 4,000 @ 28 days Sample Material/Shape: Concrete Cylinders Type of Structure: Footing Location: Onsite Location for overall Footings G-D/1-3 pour: Location E.5/1 when sampled: Concrete Quality Actual Mix Temperature (°F): 69 Req'ment 50-90 Actual Slump (in.): 4.5 Req'ment 4 +/- 1 Actual Unit Weight (pcf): N/A Req'ment N/A Air Temperature (°F): 64 >40 Air Content (%): N/A N/A Time Sampled: 10:50 am N/A Aggregate Size (in): 3/4/#62 N/A Time Batched: 9:46 am N/A Time in Truck: 64 mins <90 Mins. Information supplied by Laboratory Technician Date Received: 02/02/2013 Technician that received: TW Test # 1 Age of Test (Days) Date Technician Dimensions (inch) XSection Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture Diameter Length Area (W) A 7 02/08/13 AP 6.00 12.00 28.27 60,800 2,150 3 B 28 03/01/13 AP 6.00 12.00 28.27 141,320 5,000 3 C 28 03/01/13 AP 6.00 12.00 28.27 152,310 5,390 3 D' H MEETS DESIGN STRENGTH 28 Day Avg.: 1 5,190 Reviewed by: Emily Stronks - Staff Engineer 03/01/2013 Date 4STM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231 or C173, C470, C511, C617, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Fracture ,re_ Key 1 Well -formed cones on both ends 13. columnar vertical cracking through both ends 5. Side fractures at top or bottom 12 Well -formed cone on one end 14. Diagonal fracture with no cracking through ends 16. Similar to Type 5 but end of cylinder is pointed Testing was performed by qualified personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited. d Wkx CONSTRUCTION TESTING ERVI E 'y"ttvVW. CtS-1 'C0M ton r2S.41 `'_..el-4? Scan zl U54. 47 Field Number: 6 Laboratory Compression Test Project Name: Apple Campus 2 Mock -Up Appl No: 12020109 Project No.: J8359 Sampled By: Ramon Carrillo Report Date: 03/01/2013 Client: Apple Inc. Date of Sampling: 02/01/2013 Lab Log No.: 76355 Information provided by Field Technician Mix #: 440PB501 Supplier: Central Contractor: BPR Const. Set: 1 of 1 JTruck #: 1612 Design Stren th (psi): 4,000 @ 28 days Sample Material/Shape: Concrete Cylinders Location: Onsite Location for overall Footings G-D/1-3 pour: Type of Structure: Footing Location D/2 when sampled: Concrete Quality Actual Req'ment Mix Temperature (OF): 70 50-90 Air Temperature (OF): 69 >40 Aggregate Size (in): 3#/68 N/A Actual Req'ment Actual Slump (in.): 4.5 4 +/- 1 Unit Weight (pct : N/A Air Content (%): N/A N/A Time Sampled: 2:03 pm Time Batched: 1:01 pm NIA Time in Truck: 62 mins Req'ment N/A N/A <90 Mins. Information supplied by Laboratory Technician Date Received: 02/02/2013 Technician that received: TW Test # 1 Age of Test (Days) Date ` Technician Dimensions (inch) XSection Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture Diameter Length Area (in2) A 7 02/08/13 AP 1 6.00 12.00 28.27 56,080 1,980 3 B 28 03/01/13 AP 6.00 12.00 28.27 132,820 4,700 3 C 28- 03101113 AP 6.00 12.00 28.27 134,810 4,770 3 D H H F I I I: MCC 10 uCJIu111 J I mr-Imu I" 28 Day Avg.: 1 4,730 Reviewed by: Emily Stronks - Staff Engineer 03/01 /2013 Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231 or C173, C470, C511, C617, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Fracture Key 1 Well -formed cones on both ends 13. Columnar vertical cracking through both ends 5. Side fractures at top or bottom 2 Well -formed cone ononeend 14. Diagonal fracture with no cracking throw h ends 6 Similar to Type 5 but end of cylinder is pointed Testing was performed by qualified personnel in accordance with generally accepted industry practice, material testing consultants procedures ano the aoove reverence scanuai us. 11-1.11 applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited. • TESTING AM CONSTRUCTION • INSPECTION TESTING SERVICES 0 ENGINEERING September 23, 2013 City of Cupertino 10300 Torre Ave. Cupertino, CA 95014-3255 Job No: J8359 Summary Report #31 G �L 2L RECEIlVMD OCT 0 2 2013 Name: 2118 Rheem Drive, Pleasanton, CA 94588 0 Phone (925) 462-5151 0 Fax (925) 462-5183 4770 Duckhom Drive, Sacramento, CA 95834 • Phone (916) 419-4747 0 Fax (916) 419-4774 One Embarcadero Center, Suite 535, San Francisco, CA 94111 • Phone (415) 438-2357 0 Fax (415) 334-4747 246 30t' St., Suite 101, Oaldand, CA 94601 • Phone (510) 444-4747 0 Fax (510) 835-1825 CONSTRUCTION TESTING SERVICES Summary Report #31 September 23, 2013 Apple, Inc. 1 Infinite Loop Cupertino, CA 95104 Job No: J8359 Job Name: Apple Campus 2 Mock -Up / V 10520 Ridgeview Court V L) Cupertino, CA I Permit #: 12020109 September 16, 2013 TESTING INSPECTION ENGINEERING Kevin Meyers reported to Brian Rose with Glazier Ironworks at the shop in Hayward, CA. Reviewed welder qualification papers for Santos Larios—ID #0429, Romero Leon —ID #0437, and Tavier Larios—ID #0411. Observed welding in progress and completed performed by (3) welders previously reported using FCAW process with E71 T-1 wire. Weldments observed consisted of partial penetration, single pass fillet welds joining TS column to base plate, plate to TS column, plate to TS beam, and splice to TS. Member checklist attached. Work observed was, to the best of Kevin`s knowledge in conformance with approved plans, specifications and applicable standards of workmanship. Laboratory test results are enclosed if testing was done during the period covered by this report. Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. d', , z &Z� �, 4 , L 9/26/2013 Reviewed by Andy Malone E.I.T. Date Staff Engineer Technical Contact: Timothy Casey, Senior Engineer (tcasey@cts-Lcom) Administrative Contact: Yolanda Deras (yderas@cts-Lcom) cc: Building Department — City of Cupertino Contractor — DPR/Skanska JV (email) Architect — Foster & Partners Limited (email) Structural Engineer — Ove ARUP & Partners (email) CTS PM's — Jim Doyle & Aaren McBride (email) CTS Staff Engineer — Jon Felts & Andy Malone (email) NU J 2118 Rheem Drive, Pleasanton, CA 94588 0 Phone (925) 462-5151 Fax (925) 462-5183 4770 Duckhom Drive, Sacramento, CA 95834 • Phone (916) 419-4747 • Fax (916) 419-4774 One Embarcadero Center, Suite 535, San Francisco, CA 94111 Phone (415) 438-2357 • Fax (415) 334-4747 246 30tb St., Suite 101, Oakland, CA 94601 0 Phone (510) 444-4747 • Fax (510) 835-1825 nil.. ,:e �' eb4/$'0' 1', k2 g E- �"("j �.' b I 3a• Raw ' ..-Ex 030 dF `^r "�.is (¢ ? ➢}h����I/ `fi r 'hJ� L Y ,NB F x,k.'f:A h awnl . S�, ^,roF^..Su'. '� ORNA ,AAS6: t�" F`�7T+4 ,#!m.1.. '. �.,. f.p,t�Ajxw T,}. ,w: M •➢ f,5 ;tx;, r, ,::�'.:,. .�>• %,. >r �,�{ , i�>E��. �,5 . }� t Mill, F :,� � --"' � , p hCFI £ h, � „�:: ��4^;•.�, ,�-;Y . 9k„ ;: .d'.:':: a� � � ,s, ��� �, a.-,F... ,.,.,.,.,....E '. F�.,. .: ' „.S ..�� .E<�M ' �E ✓.t ".'>;, :.Yfs,;:➢,.� ajg, (, 5�S'i:H_�:....1'• a .§,bv v L,?. ,?„ � x.� � N a„Sfj',. SAY � I � 8 . F&=� ,inl n 71&4..'-5..j54` 16,41 -z-74r CONSTRUCTION WWW.cis-l.cor Lcl Ct,- d 510.444.4 47 Field Number: 5 Laboratory Compression Test Project Name: Apple Campus 2 Mock -Up Appl No: 12020109 Project No.: J8359 Sampled By: Ryan Gouthro Report Date: 09/23/2013 Client: Apple Inc. Date of Sampling: 09/09/2013 Lab Log No.: 84429 Information provided by Field Technician Mix #: 1560709 Sup lier: Cemex Contractor: DPR Set: 1 of 1 ITruck #: 3478 1 Design Strength (psi): 5,000 @ 28 days Sample Material/Shape: Concrete Cylinders 4x8 ITYpe of Structure: Footing Location: Onsite Location for overall Temp. facade for canopy footing pour: Location Temp. facade for canopy footing when sampled: Concrete Quality Actual Mix Temperature (°F): 75 Req'ment 50-90 Actual Slump (in.): 6 1/4 Req'ment 5-7 Actual Unit Weight (pcf): N/A Req'ment N/A Air Temperature (°F): 84 >40 Air Content (%): N/A N/A Time Sampled: 1:42 pm N/A Aggregate Size (in): 1 N/A Time Batched: 1:02 pm N/A Time in Truck: 40 mins <90 Mins. Information supplied by Laboratory Technician Date Received: 09/10/2013 Technician that received: CH Test # 1 Age of Test (Days) Date Technician Dimensions (inch) XSection Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture Diameter Length Area (in?) A 7 09/16/13 DM 4.00 8.00 12.57 1 46,820 3,730 Type 3 B 10/07/13 4.00 8.00 12.5E7 C 28 10/07/13 1 4.00 8.00 12.57 D28 28 10/07/13 4.00 8.00 12.57 E H Remarks: L15 28 Day Avg.: t 09/23/2013 Reviewed by: Andy Malone - Staff Engineer Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231 or C173, 0470, C511, C617, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Fracture Key: 1. Well -formed cones on both ends. 3. Columnar vertical cracking through both ends 5. Side fractures at top or bottom 12. Well -formed cone on one end 14. Diagonal fracture with no cracking through ends 16. Similar to Type 5 but end of cylinder is pointed Testing was performed by qualified personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited. <,efd=ril on Y 15A: 2.51 51 Sac `t::.s-nt;) `. ?,4. ;i 9.474.7 Onayx..d5110.444,4 7 WWW .ds-1.Co Field Number: 10 Laboratory Compression Test Project Name: Apple Campus 2 Mock -Up Appl No: 12020109 Project No.: J8359 Sampled By: Frank Hernandez Report Date: 09/23/2013 Client: Apple Inc. Date of Sampling: 08/20/2013 Lab Log No.: 83666 - 1 Information provided by Field Technician Mix #: 1561239 Supplier: Cemex Contractor: DPR Set: 1 of 2 ITruck #: 3474 Design Strength (psi): 5,000 @ 28 days Sample Material/Shape: Concrete Cylinders 6x12 T pe of Structure: SOG Location: Onsite Location for overall North Corner pour: Location North Corner when sampled: Concrete Quality Actual Mix Temperature (°F): 72 Req'ment 50-90 Actual Slump (in.): 5 112 Req'ment 5.5-8.5 Actual Unit Weight (pcf): N/A Req'ment N/A Air Temperature (°F): 67 >40 Air Content (%): N/A N/A Time Sampled: 7:30 am N/A Aggregate Size (in): 3/8 " N/A Time Batched: 6:24 am N/A Time in Truck: 66 mins <90 Mins. Information supplied by Laboratory Technician Date Received: 08/21/2013 Technician that received: JB Test # 1 Age of Test (Days) Date Technician Dimensions (inch) XSection Ultimate Load (Ibs) Compressive Strength (psi) Type of Fracture Diameter Length Area (in') A 2 08/22/13 DM 6.00 12.00 28.27 80,080 2,830 1 Type 3 B 3 08/23/13 DM 6.00 12.00 28.27 104,070 3,680 Type 3 C 7 08/27/13 AA 6.00 12.00 28.27 147,400 5,210 Type 3 D 28 09/17/13 DM 6.00 12.00 28.27 215,250 7,610 Type 3 E 56 10/15/13 6.00 12.00 28.27 Remarks: L15 28 Day Avg.: 1 7,610 09/23/2013 Reviewed by: Stephen Stroup - Staff Engineer Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231 or C173, C470, C511, C617, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Fracture Key: 1. Well -formed cones on both ends 13. Columnar vertical cracking through,both a Ids 5. Side fractures at top or bottom 12. Well -formed cone on one end 14. Diagonal fracture with no cracking through ends 6. Similar to Type 5 but end of cylinder is pointed Testing was performed by qualified personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited. Page 1 of 2 7A25.' ...3I5n S r��. r='i�f'W 9? 6.41':lr"74,' HALt i T T E 5 a... r}-_ram f 41 .ti.�i 7 S,-kfc.T...O .50 7 SS rr tic t j: >d 510.444.4. ] COM Field Number: 10 Laboratory Compression Test Project Name: Apple Campus 2 Mock -Up Appl No: 12020109 Project No.: J8359 Sampled By: Frank Hernandez Report Date: 09/23/2013 Client: Apple Inc. Date of Sampling: 08/20/2013 Lab Log No.: 83666 - 2 Information provided by Field Technician Mix #: 1561239 Supplier: Cemex Contractor: DPR Set: 2 of 2 ITruck #: 6037 Design Strength (psi): 5,000 @ 28 days Sample Material/Shape: Concrete Cylinders 6xl2 Type of Structure: SOG Location: Onsite Location for overall North West pour: Location North West when sampled: Concrete Quality Actual Mix Temperature (°F): 68 Req'ment 50-90 Actual Slump (in.): 7 1/2 Req'ment 5.5-8.5 Actual Unit Weight (pcf : N/A Req'ment N/A Air Temperature (°F): 68 >40 Air Content (%): N/A N/A Time Sampled: 8:10 am N/A Aggregate Size (in): 3/8" N/A Time Batched: 6:59 am N/A Time in Truck: 71 mins <90 Mins. Information supplied by Laboratory Technician Date Received: 08/21/2013 Technician that received: JB Test # 2 Age of Test (Days) Date Technician Dimensions (inch) X-Section Ultimate Load pos) Compressive Strength (psi) Type of Fracture Diameter Length Area (W) A 2 08/22/13 DM 6.00 12.00 28.27 80,570 2,850 Type 3 B 3 08/23/13 DM 6.00 12.00 28.27 106,440 3,760 Type 3 C 7 08/27/13 AA 6.00 12.00 28.27 122,850 4,340 Type 3 D 28 09/17/13 FG 6.00 12.00 28.27 211,850 7,490 Type 3 E 56 10/15/13 6.00 1 12.00 28.27 Remarks: L15 28 Day Avg.: I7,490 09/23/2013 Reviewed by: Stephen Stroup - Staff Engineer Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231 or C173, C470, C511, C617, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Fracture Key 1. Well -formed cones on both ends 3. Columnar vertical cracking fbwugh both ends 5. Side fractures at top or bottom 12. Well -formed cone on one end 14. Diagonal fracture with no cracking through ends 16. Similar to Type 5 but end of cylinder is pointed Testing was performed by qualified personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests perfomred and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited. Page 2 of 2 t' [ T t'�L 5�f. �;,1c:i}c 4 4I _,a i ;_474% 3'; ,4 l r =117.7:555 rim i _ _.. _ , .l, o . e-, "i q Ock+: nd Yi 0. 4114.47 7 Field Number: 4 Laboratory Compression Test Project Name: Apple Campus 2 Mock -Up Appl No: 12020109 Project No.: J8359 Sampled By: Tony Perez Report Date: 09/23/2013 Client: Apple Inc. Date of Sampling: 08/23/2013 Lab Log No.: 83801 Information provided by Field Technician Mix #: 1414897 Supplier: Cemex Contractor: DPR Set: 1 of 1 ITruck #: 3483 Design Strength (psi):, 8,000 @ 28 days Sample Material/Shape: Concrete Cylinders 6x12 Type of Structure: Column Location: Onsite Location for overall C-G / 1-3, perimeter columns pour: Location EA / 3, column when sampled: Concrete Quality Actual Mix Temperature (OF): 68 Req'ment 50-90 Actual Slump (in.): 29 Req'ment 20-30 Actual Unit Weight (pcf): N/A Req'ment N/A Air Temperature (OF): 60 >40 Air Content (%): N/A N/A Time Sampled: 8:15 am N/A Aggregate Size (in): 3/8 3/8 Time Batched: 7:22 am N/A Time in Truck: 53 mins <90 Mins. Information supplied by Laboratory Technician Date Received: 08/26/2013 Technician that received: JB Test # Age of Test (Days) Date Technician Dimensions (inch) XSection Ultimate Load (IDS) Compressive Strength (psi) Type of Fracture Diameter Length Area (in-) A 1 7 1 08/30/13 DM 6.00 12.00 28.27 215,020 7,600 Type 3 B 28 09/20/13 TW 6.00 12.00 28.27 320,450 11,330 Type 3 C 28 09/20/13 TW 6.00 12.00 28.27 327,390 11,580 Type 3 D H Remarks: L14 MEETS DESIGN STRENGTH 28 Day Avg.: 11,460 1 j 09123/2013 Reviewed by: Andy Malone - Staff Engineer Date %STM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231 or C173, C470, C511, C617, C1077, C1231,C1064, C138 and E4. Compressive strength tests perASTM C39. Fracture Key: t1. Well -formed cones on both ends 3: �tslumnar vertical cracking through both ends 5. Side fractures at top or bottom 12. Well -formed cone on one end 14. Diagonal fracture with no cracking through ends J6. Similar to Type 5 but end of cylinder is pointed Testing was performed by qualified personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited. CONSTRUCTION am` [fir ! T (�� S�� ro:., nt-� . t..✓ f TF�a.41' 1 :IVi Scin �`:Ft�:i.;r;�'s .i1;1.3 4 „�7 Sfu-, nyn, : fps -- .`4 e - Field Number: 4 Laboratory Compression Test Project Name: Apple Campus 2 Mock -Up Appl No: 12020109 Project No.: J8359 Sampled By: Tony Perez Report Date: 09/23/2013 Client: Apple Inc. Date of Sampling: 08/23/2013 Lab Log No.: 83800 Information provided by Field Technician Mix #: 1560709 Supplier: Cemex Contractor: DPR Set: 1 of 1 ITruck #: DPR Design Strength (psi): 5,000 @ 28 days Sample Material/Shape: Concrete Cylinders 6x12 T pe of Structure: Collector Beams Location: Onsite Location for overall C-G / 1-3, collector beams on roof pour: Location G / 1-3, C. Beams when sampled: Concrete Quality Actual Mix Temperature (IF): 74 Req'ment 50-90 Actual Slump (in.): 7 Req'ment 6 +/- 1 Actual Unit Weight (pcf): N/A Req'ment N/A Air Temperature (OF): 63 >40 Air Content (%): N/A N/A Time Sampled: 10:23 am N/A Aggregate Size (in): 1 1 Time Batched: 9:27 am N/A Time in Truck: 56 mins <90 Mins. Information supplied by Laboratory Technician Date Received: 08/26/2013 Technician that received: JB Test # 1 Age of Test (Days) Date Technician Dimensions (inch) XSection Ultimate Load (lbs) Compressive Strength (psi) Type of Fracture Diameter Length Area (inz) A 7 08/30/13 DM 6.00 12.00 28.27 119,950 4,240 Type 3 B 28 09/20/13 TW 6.00 12.00 28.27 180,060 6,370 Type 3 C 28 09/20/13 TW 6.00 12.00 28.27 171,000 6,050 Type 3 D H Remarks: L15 MEETS DESIGN STRENGTH 28 Day Avg.: 1 6,210 09/23/2013 Reviewed by: Andy Malone - Staff Engineer Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231 or C173, C470, C511, C617, C1077, C1231,C1064, C138 and E4. Compressive strength tests perASTM C39. Fracture Key: 1. Well -formed cones on both ends 3. Columnar verE l cracking through both ends 15. Side fractures at top or bottom 12. Well -formed cone on one end 4. Diagonal fracture with no cracking through ends 16. Similar to Type 5 but end of cylinder is pointed Testing was performed by qualified personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited. Matedaf Identification Job Name: = S '"� Job#: Inspector: t# Date: Material Type and :Size Accept Heat f��rm6er Yes[No Material ype and Size Heat Nusrtber Accept Yes[No -,c qx Se q3to wb lob —L7 M h 8r it tt - oe t 4 Member Check List Project: 1 -` � Jab #: eS5""I_ Rep: Date: b �► { Y ramui� � Page_4f • TESTING 1 CONSTRUCTION • INSPECTION TESTING SERVICES 0 ENGINEERING Summary Report 919 February 25, 2013 Apple, Inc. �iG`EI�%FrD 1 Infinite Loop Cupertino, CA 95104 MAR o 5 2013 Job No: J8359 Name: _ Job Name: Apple Campus 2 Mock -Up , 10520 Ridgeview Court / v Cupertino, CA ov li Permit #: 120201' February 19, 2013 Ramon Carrillo reported to Elias (DPR Foreman) at the jobsite. Observed placement of reinforcing steel for concrete walls at lines D/2, E/2, F/2, and G/2. Observed in place vertical and horizontal reinforcing steel per detail 4A on F-2. #4 and #F5 ties per SRC2A-201, #2 and 3, ties with 135 hook and hair pins with I35° hook at (1) side and 90' hook at opposite side. Note: #7 horizontals with 901 hook, also in place interlock Linton with A706 # 11 rebar reference Clark Pacfic Schedule C-3 dated 1/7/13 and Tekla Structurals dated 1/12/13, and SRC2A, 02/23/12. Work observed was, to the best of Ramon's knowledge, in conformance with approved plans, specifications and applicable standards of workmanship. February 21, 2013 Ramon Carrillo reported to Elias (DPR Foreman) at the jobsite. Observed placement of concrete (mix no. 280138D3, 28-day strength of 6000 psi, specified slump of 7+/-1 inch, 13 total cubic yards placed) for lines D/2, E/2, F/2, and G/2. Monitored loads for mix no., slump, temperature and time limit. Prepared cylinder test specimens sampled from middle of load. Set 1 Slump 6 (m•) Mix temp. 68 (OF) Air temp. 62 (OF) Truck No. 1602 Location Pony wall at lines G/2 10 Per Set, 1 Set, 10 Total Concrete was mechanically consolidated, work is in progress. 2118 Rheem Drive, Pleasanton, CA 94588 - Phone (925) 462-5151 • Fax (925) 462-5183 4770 Duckhom Drive, Sacramento, CA 95834 • Phone (916) 419-4747 • Fax (916) 4194774 One Embarcadero Center, Suite 535, San Francisco, CA 94111 • Phone (415) 438-2357 0 Fax (415) 334-4747 246 301 St., Suite 101, Oakland, CA 94601 • Phone (510) 444-4747 0 Fax (510) 835-1825 CONSTRUCTION TESTING SERVICES TESTING INSPECTION ENGINEERING Observed placement•of reinforcing steel for concrete walls at lines G/2.8-3 and G-C/3, reference details 6/172, l/F2, 2/F2, and 3/F2. In place interlock Linton at lines G/2.8-3 type C3 - T1 with #11 bar•, at lines F-G/3 - T3 - C4 with #8 bar; F/3 - T5 - C2 with #7 bar; E/3 - T5 - C2 with #7 bar; E.4/3 - T5 - C2 with #7 bar; D/2 - T6 - C5 with # 10 bar. All bars on TS are vertical; and'(4) pilasters per detail on F/2 at lines C-G/3 with #4 ties at 6" on center and hair pins at 6" on center typical; and at lines G/2.8, G/2, F/2.8, F/3, D/3 with #5 ties and hair pins with 135' hook at 6" on center, reference PC12-1 dated 1/17/13 and Conco sheet #1 dated 1/16/13. Work observed was, to the best of Ramon's knowledge, in conformance with approved plans, specifications and applicable standards ofworkmanship. February 22, 2013 Ramon Carrillo reported to Elias (DPR Foreman) at the jobsite. Observed placement of reinforcing steel for concrete walls at lines C-G/3, G/1-1.3, F/1-1.3, reference details i/F2, 2/F2, 3/F2, 4A/F2, Linton Interlok at lines G - T 1 - C3 #1 l ; F-G - T3 - C4 #8 bar; F-E - T4 - C2 with #7 bar; E-D -T5 - C3 with #7 and T6 - C5 with # 10, at lines G/1.3, G/l, F/1 and F/1.1 pilasters with #5 ties and hair pins with 135' hook.spaced at 6" on center staggered; at lines E.8-D/1 same detail and (4) pilaster typical with #4 ties with hair pins spaced at 6" on center ties and hair pin with 135° hook. All horizontal #bat 12" on center except at lines G/1-1.1 and F/1-1.1 with #7 horizontal, reference PC12.1 dated 1/17/13, Clark Pacific dated 1/7/13. Work observed was, to the best of Ramon's knowledge, in conformance with approved plans, specifications and applicable standards of workmanship. Steve Corona picked up 10 cylinders from the jobsite. Laboratory test results are enclosed if testing was done during the period covered by this report. Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work Even with diligent inspection techniques, the contractor is so able for defects or failures to adhere to the code. ;= v— 2/27/2013 Review4% Andy o .I.T. Date Staff ErtAeer Technical Contact: Timothy Casey, Senior Engineer (tcasey@cts-l.com) Administrative Contact: Yolanda Deras (yderas@cts-l.com) cc: Building Department City of Cupertino Contractor - DPR/Skanska JV (email) Architect - Foster & Partners Limited (email) Structural Engineer - Ove ARUP & Partners (email) CTS PM's - Jim Doyle & Aaren McBride (email) CTS Staff Engineer - Jon Felts (email) 2118 Rheem Drive, Pleasanton, CA 94588 • Phone (925) 462-5151 • Fax (925) 462-5183 4770 Duckhorn Drive, Sacramento, CA 95834 Phone (916) 419-4747 0 Fax (916) 419-4774 One Embarcadero Center, Suite 535, San Francisco, CA 94111 • Phone (415) 438-2357 • Fax (415) 334-4747 246 30`t' St., Suite 101, Oakland, CA 94601 0 Phone (510) 444-4747 0 Fax (510) 835-1825 CONSTRUCTION TESTING SERVICES October 7, 2013 Apple, Inc. 1 Infinite Loop Cupertino, CA 95104 Job No: J8359 Job Name: Apple Campus 2 Mock -Up 10520 Ridgeview Court Cupertino, CA Permit #: 12020109 September 30, 2013 Summary Report #32 ) I , P-,--*" r� TESTING INSPECTION ENGINEERING Ryan Gouthro reported to Forrest with DPR at the jobsite. Observed placement of concrete (mix no. 1561239, 28- day strength of 5000 psi, specified slump of 5-7 inches, 36 total cubic yards placed) for circulation corridor, C-D. Monitored loads for mix no., slump, temperature and time limit. Prepared cylinder test specimens sampled from chute. Set 1 Slump 5 %z (in.) Mix temp. 74 (OF) Air temp. 67 (OF) Truck No. 6014 Location Circulation slab, C-D 5 Per Set, 1 Set, 5 Total 2 cylinders at 60 hour breaks require 3000 psi and 3 cylinders at 28 day breaks require 5000 psi. Work observed was, to the best of Ryan's knowledge in conformance with approved plans, specifications and applicable standards of workmanship. October 1, 2013 Steve Corona picked up (5) cylinder samples from the jobsite. October 3, 2013 Emily Stronks reported to Andy with DPR at the jobsite. Performed floor flatness testing on topping slab mockup. FF requirements were 35 and FL requirements were 25, per spec 033000. FF and FL measurements met requirements. Measurements were performed in general accordance with ASTM-El155-96 (2008). See attached report for testing results and details. 2118 Rheem Drive, Pleasanton, CA 94588 0 Phone (925) 462-5151 4770 Duckhorn Drive, Sacramento, CA 95834 0 Phone (916) 419-4747 One Embarcadero Center, Suite 535, San Francisco, CA 94111 • Phone (415) 438-2357 246 30'h St., Suite 101, Oakland; CA 94601 0 Phone (510) 444-4747 • Fax (925)462-5183 • Fax (916) 419-4774 • Fax (415) 334-4747 • Fax (510) 835-1825 CONSTRUCTION TESTING SERVICES TESTING INSPECTION ENGINEERING Work observed was, to the best of Emily's knowledge in conformance with approved plans, specifications and applicable standards of workmanship. October 4, 2013 Jonathan Felts reported to Ross with DPR at the jobsite. Installed temperature and humidity monitoring couplers. Installed (12) couplers total in mock-up room. Table below to show locations and monitor numbers: Reader #: Plan Location: Height: 109 SE Comer Mid 110 E Middle Lower 113 NE Corner Lower 107 S Center Lower 108 S Center High 103 Center Lower 102 Center High 105 N Center Lower 106 N Center High 115 E Middle High 111 W Middle Lower 112 W Middle High Work observed was, to the best of Jonathan's knowledge in conformance with approved plans, specifications and applicable standards of workmanship. Laboratory test results are enclosed if testing was done during the period covered by this report. Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques, the contractpr is solely liable for defects or failures to adhere to the code. 10/9/2013 Reviewed by Ahcry Malone E.I.T. Date Staff Engineer Technical Contact: Timothy Casey, Senior Engineer (tcasey@cts-l.com) Administrative Contact: Yolanda Deras (vderas@cts-l.com) cc: Building Department — City of Cupertino Contractor — DPR/Skanska JV (email) Architect — Foster & Partners Limited (email) Structural Engineer — Ove ARUP & Partners (email) CTS PM's — Jim Doyle & Aaren McBride (email) CTS Staff Engineer — Jon Felts & Andy Malone (email) NKS 2118 Rheem Drive, Pleasanton, CA 94588 a Phone (925) 462-5151 • Fax (925) 462-5183 4770 Duckhom Drive, Sacramento, CA 95834 • �i) Phone (916) 419-4747 Fax (916) 419-4774 One Embarcadero Center, Suite 535, San Francisco, CA 94111 • Phone (415) 438-2357 • Fax (415) 334-4747 246 30th St., Suite 101, Oakland, CA 94601 0 Phone (510) 444-4747 • Fax (510) 835-1825 , ¢ u . I p g�T �s. CONSTRUCTION TESTING SERVICES Gk: 7.-:d 5'i 0.44,C4 ='=r rar r ,:enr� { -9-4,7417 D: -r 5=.a Field Number: 5 Laboratory Compression Test Project Name: Apple Campus 2 Mock -Up Appl No: 12020109 Project No.: J8359 Sampled By: Ryan Gouthro Report Date: 10/07/2013 Client: Apple Inc. Date of Sampling: 09/30/2013 Lab Log No.: 85323 Information provided by Field Technician Mix #: 1561239 Supplier: Cemex Contractor: DPR Set: 1 of 1 ITruck #: 6014 Design Strength (psi): 5,000 @ 28 days Sample Material/Shape: Concrete Cylinders 4x8 Type of Structure: Slab on metal deck (mockup) Location: Onsite Location for overall Slab on metal deck for circulation corridor C-D pour: Location Slab on metal deck for circulation corridor C-D when sampled: Concrete Quality Actual Mix Temperature (°F): 74 Req'ment 50-90 Actual Slump (in.): 5 1/2 Req'ment 5-7 Actual Unit Weight (pcf): N/A Req'ment N/A Air Temperature (°F): 67 >40 Air Content (%): N/A N/A Time Sampled: 8:16 am N/A Aggregate Size (in): 3/8 N/A Time Batched: 7:10 am N/A Time in Truck: 66 mins <90 Mins. Information supplied by Laboratory Technician Date Received: 10/01/2013 Technician that received: CH Test # 1 Age of Test (Days) Date Technician Dimensions (inch) X-Section Ultimate Load (IDS) Compressive Strength (psi) Type of Fracture Diameter Length Area (inz) A I 2 10/02/13 DM 4.00 8.00 12.57 33,260 2,650 Type 3 2 10/02/13 DM 4.00 8.00 12.57 31,290 2,490 Type 3 C LIB 28 1 10/28/13 4.00 8.00 12.57 D 28 10/28/13 4.00 8.00 12.57 E 28 10/28/13 1 4.00 8.00 12.57 Remarks: L15 28 Day Avg.: 10/07/2013 Reviewed by: Andy Malone - Staff Engineer Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231 or C173, C470, C511, C617, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Fracture Key 1 Well -formed cones on both ends 13. columnar vertical cracking through both ends 5. Side fractures at top or bottom 12 Well -formed cone on one end 14. Diagonal fracture with no cracking through ends 16. Similar to Type 5 but end of cylinder is pointed Testing was performed by qualified personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited. • TESTING CONSTRUCTION • INSPECTION TESTING SERVICES • ENGINEERING October 2, 2013 Apple, Inc. 1 Infinite Loop Cupertino, CA 95104 Job No: J8359 Job Name: Apple Campus 2 Mock -Up 10520 Ridgeview Court Cupertino, CA Permit #: 12020109 Subject: Floor Flatness/Levelness Report Dear Mr. Vardaman, In accordance with your authorization, a floor flatness test was performed on the topping slab mock up, poured October 1, 2013. A FACE Dipstick® 2272 was used. Measurements were performed in general accordance with ASTM E 1155 — 96(2008). A summary of the test performed is outlined below. Section Section 01 Pour Date 10/1/13 Date Measured 10/2/13 Section Topping slab Type of Run Selection 45 degree Measured Ff (section) <90% Confidence Interval> 39.70 <36.25 - 43.14> Measured FI (section) <90% Confidence Interval> 36.17 <31.07 - 41.26> Floor Flatness (FF) Requirement (Minimum Local Flatness FF) 35 (24) Floor Levelness (FL) Requirement (Minimum Local Levelness FL) 25 (17) The overall FF and FL for this pour is 39.70 and 36.17 respectively. The values measured meet project specifications 033000. 4770 Duckhom Drive, Sacramento, CA 95834 Phone (916) 419-4747 Fax (916) 419-4774 2118 Rheem Drive, Pleasanton, CA 94588 Plione (925) 462-5151 Fax (925) 462-5183 One Embareadero Center, Suite 535, San Francisco, CA 94111 Phone (415) 438-2357 Fax (415) 334-4747 246 30°i St.. Suite 101, Oakland, CA 94601 • Phone (510) 444-4747 Fax (510) 835-1825 CONSTRUCTION ABILAU TESTING SERVICES TESTING INSPECTION ENGINEERING Attached are the sketches of runs measured, project summary, section summaries, and the individual run profiles. If you have any inquiries or require additional information, please contact our office. Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Emily Stronks Staff Engineer Technical Contact: Timothy Casey, Senior Engineer (tcasey@cts-l.com) Administrative Contact: Yolanda Deras (yderas@cts-l.com) cc: Building Department — City of Cupertino Contractor — DPR/Skanska JV (email) Architect — Foster & Partners Limited (email) Structural Engineer — Ove ARUP & Partners (email) CM — Bob Rueter (email) CTS PM's — Jim Doyle & Aaren McBride (email) 4770 Duckhcnn Dive.. Sacramento, CA 95834 • Phone (916) 419-4747 Fax (916) 419-4774 2118 Rheem Diive, Pleasanton, CA 94588 • Phone (925) 462-5151 Fax (925) 462-5183 One Embarcadero Center, Suite 535, San Francisco, CA 94111 Phone (415) 438-2357 Fax (415) 334-4747 246 30"' St., Suite 101, Oakland, CA 94601 Phone (510) 444-4747 Fax (510) 835-1825 Job: J8359, Surface: Topping slab Pour 10-1-13 Combined Section Section: Topping Slab ---------------------------------------------------------------------------------------- ------------ Measured FF: 39.70 <36.25 - 43.14> Specified FF: 35.00 Measured FL: 36.17 <31.07 - 41.26> Specified FL: 25.00 Run Name FF 01 N E01 29.63 <38.89-20.37> 01SW02 53.92 <70.77-37.07> 01 N E03 62.76 <82.37-43.15> 01SW04 43.77 <57.45-30.09> 01 NE05 39.67 <52.06-27.27> 01 SW 06 46.48 <61.00-31.96> 01 N E07 31.67 <41.57-21.78> 01SW08 39.31 <5.1.60-27.03> 01 N E09 40.02 <52.52-27.51 > 01 SW 10 35.12 <46.09-24.15> 01 NE11 30.13 <39.54-20.72> 01 SW 12 51.32 <67.36-35.28> 01 N E 13 54.89 <72.04-37.74> 78 Z-Readings 1 Min Local FF: 24.00 Min Local FL: 17.00 FL Readings 24.33 <35.94-12.72> 15 21.33 <31.51-11.15> 15 33.88 <50.06-17.71 > 15 81.49 < 1 20.38-42.60> 15 37.05 <54.73-19.37> 15 39.85 <58.87-20.83> 15 79.70 <117.74-41.67> 15 26.21 <38.71-13.70> 15 47.75 <70.53-24.96> 15 93.20 <137.68-48.72> 15 72.17 <106.61-37.73> 15 35.80 <52.89-18.72> 15 43.31 <63.98-22.64> 15 195 Dipstick Readings VOLX(t(i on : l o I I I a ro f p i ✓A A stab Acz \-OIIA ic-L1s - m959 YY aSu.rd ®n- tti I Z l ► 3 ov:moA UYAt5 N 6-- 4 b L , I�e _ ,w IZ 1 p � � f 0.150 0.10C 0.05C co c 0.000 -0.05( -0.10( 01 NE01 - - - - - - - - - - - ----------- - - - -- - - - - - - — — --- — — -I---- — — — --L ---I }------{----I--- — — — — - — — — -0.150 ml IM I feet 10.0 15.0 FF = 29.6 <20.4 - 38.9> FL = 24.3 < 12.7 - 35.9> a 0.00( LI MCI 5.0 15.0 FF = 53.8 «37.1 - 70.8> FL = 21.3 <11.2 - 31.5> 01NEO3 0.200 0.150 0.050 OF 0.000 T -0.050 -0.250 0.0 5.0 10.0 15.0 H c 0 IN 01SW04 0.0 5.0 10.0 15.0 feet FF = 43.8 <30.1 - 57.4> FL = 81.5 <42.6 - 120.4> 0]2O c 0.00( O1NEO5 MCI 5.0 15.0 FF= 397 <27.3 -521> FL= 37.0 <18.4 -54.7> D.O 5.0 10.0 15.0 0 0,075 0.05 0 0.025 0.000 -0.02 5 -0.05( 01 NE07 - - - - - - - - - - -- ------------ -0.075 5.0 feet 10.0 15.0 FF = 31.7 <21.8 - 41.6> FL = 79.7 <41.7 - 117.7> 0.25( 0.20( 0.15( 0.101 0.051 cn 0.001 -0.05, -0.10 -0.15 -0.20 01SW08 ----------- ----------- L----------- ---I--- - — — — - — — -- t- — — — — — — — — — t 1----J 4N — — — - — — — - — — -- - - - t 'I-- - - - - - - f — — — t ---t — — — 7F 7 T - — — — — — — - — — — -- - — — 4---4 - — — — — — — — — 4 — — — - — — -- ------I--- - — — — - — — — 7— T --- F --- I ------- ---I--- - — — — - — — — — — — - — — — - — — -- -0.250 Rej 5.0 feet 10.0 15.0 FF = 39.3 <27.0 - 51.6> FL = 26.2 <1 3.7 - 38.7> 0.10( 0.08( 0.06( 0.04( 0.02( 0.00( -0.021 -0.041 -0.06, -0.08 01NE09 ---- /F I - - - - - - - - ---I- - - ----- I-- L --- L --- L ------- -------- L -0.100 Nut 5.0 feet 10.0 15.0 FF = 40.0 <27.5 - 52.5> FL = 47.7 <25.0 - 70.5> to a� U H m 0. m IE 0.0 5.0 10.0 15.0 feet FF = 35.1 <24.1 - 46.1> FL = 93.2 <48.7 - 137.7> 01NE11 10 080 040 020 .040 .080 .100 0.0 5.0 10.0 15.0 lei 0. in IN 01SW12 0.0 5.0 10.0 15.0 feet FF = 51.3 <35.3 - 67.4> FL = 35.8 <18.7 - 52.9> .6 0.150 0.10C 0.05C S 0.000 -0.05( -0.10( -0.15 01NE13 - - - - - - - - - - -- - - - - - - - - - - -- —I— — — --4 — — — - - - - - - - - - - - - - - - - - - - - - - -- - - - L----------- ---I--- - - - - - - - -- ------I--- - ----I---- m 5.0 feet 10.0 15.0 FF = 54.9 <37.7 - 72.0> FL = 43.3 <22.6 - 64.0> CONSTRUCTI TESTING SER la4i "all� October 14, 2013 City of Cupertino 10300 Torre Ave. Cupertino, CA 95014-3255 Job No: J8359 Summary Report #33 !'�I L+J Iti `'z I • TESTING • INSPECTION • ENGINEERING RECEIVTED OCT 2 3 2013 Name: 2118 Rheem Drive, Pleasanton, CA 94588 Phone (925) 462-5151 Fax (925) 462-5183 4770 Duckhorn Drive, Sacramento, CA 95834 • Phone (916) 419-4747 Fax (916) 419-4774 One Embarcadero Center, Suite 535, San Francisco, CA 94111 Phone (415) 438-2357 Fax (415) 334-4747 246 30"' St., Suite 101, Oakland, CA 94601;1 0 Phone (510) 444-4747 Fax (510) 835-1825 ,y ML CONSTRUCTIi TESTING SEX October 14, 2013 Apple, Inc. 1 Infinite Loop Cupertino, CA 95104 Job No: J8359 Job Name: Apple Can 10520 Rid Cupertino, Permit #: 12020109 2 Mock -Up sw Court Summary Report #33 • TESTING • INSPECTION • ENGINEERING No field reports were made this week; however, we are enclosing laboratory test results. Limitations. These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Reviewed by Andy Malone E.IIT. Staff Engineer Technical Contact: Administrative Contact: cc: Building Departi Contractor — DPI Architect— Foste Structural Engine CTS PM's — Jim CTS Staff Engin 10/17/2013 Date rthy Casey, Senior Engineer (tcasey@cts-Lcom) ndaDeras (yderas@cts-Lcom) -nt — City of Cupertino 'Skanska JV (email) & Partners Limited (email) r — Ove ARUP & Partners (email) >oyle & Aaren McBride (email) ;r — Jon Felts & Andy Malone (email) 2118 Rheem Drive, Pleasanton, CA 94588 • 4770 Duckhom Drive, Sacramento, CA 95834 • One Embarcadero Center, Suite 535, San Francisco, CA 94111 • 246 30"' St., Suite 101, Oakland, CA 94601 • Phone (925) 462-5151 0 Fax (925) 462-5183 Phone (916) 4194747 0 Fax (916) 419-4774 Phone (415) 438-2357 0 Fax (415) 334-4747 Phone (510) 444-4747 0 Fax (510) 835-1825 CONSTRUCTION T�STfNG SERVICB vV, kt�,�'i .dis-I 'cor t . IC? a.f.T(`ll":'o 4�2a3A : r11' c�v"'l+:P�'�..''tfeilt'J Y',k. „#'��i .i..f. Sac, Fcric[s o 415.334.4 47 Sioc;kto Sun .J`—s- 408-57,3 6J '92 Los w ki,yz�is . 02,.E A> , 47 Field Number: 5 Laboratory Compression Test Project Name: Apple Campus 2 Mock-bpb Appl No: 12020109 Project No.: J8359 Sampled By: Ryan Gouthro Report Date: 10/07/2013 Client: Apple Inc. Date of Sampling: 09/09/2013 Lab Log No.: 84429 Information provided by Field Technician Mix #: 1560709 j Supplier: Cemex Contractor: DPR Set: 1 of 1 ITruck #: 3478 Design Strength (psi): 5,000 @ 28 days Sample Material/Shape: Concrete Cylinders 4x8 T pe of Structure: Footing Location: Onsite Location for overall Temp. facade� for canopy footing pour: Location Temp. facade for cano�}y footing when sampled: . Concrete Quality Actual Mix Temperature (°F): 75 Req'rjtent 50-90 Actual Slump (in.): 6 1/4 Req'ment 5-7 Actual Unit Weight (pcf : N/A Req'ment N/A Air Temperature (°F): 84 >40 Air Content (%): N/A N/A Time Sampled: 1:42 pm N/A Aggregate Size (in): 1 N/A Time Batched: 1:02 pm N/A Time in Truck: 40 mins <90 Mins. Information supplied by Laboratory Technician Date Received: 09/10/2013 Technician that received: CH Test # 1 Age of Test (Days) Date Te4hnician Dimensions (inch) XSeciion Ultimate Load (Ibs) Compressive Strength (psi) Type of Fracture Diameter Length Area (in2) A 7 09/16/13 DM 4.00 8.00 12.57 46,820 3,730 Type 3 B 28 10/07/13 DM 4.00 8.00 12.57 91,120 7,250 Type 3 C 28 10/07/13 DM 4.00 8.00 12.57 89,340 7,110 Type 3 D 28 10/07/13 DM 4.00 8.00 12.57 88,090 7,010 Type 3 E H Remarks: L15 MEETS DESIGN STRENGTH 28 Day Avg.: I7,120 Reviewed by: Stephen Stroup - Staff Engineer 10107/2013 Date ASTM Standards Used: Unless noted, material C617, C1077, C123�,C1064, was sampled and tested in accordance vvith ASTM C172, C31, C143, C231 or C173, C470, C511, C138 and E4. Compressive strength tests per ASTM C39. Fracture Key: 1. Well -formed cones on both ends 3. Columnar vertical cracking through both ends 5. Side fractures at top or bottom 2. Well -formed cone on one end 14. Diagonal fracture with no cracking thmugh ends 16. Similar to Type 5 but end of cylinder is pointed Testing was performed by qualified personnel in accordance wit`h generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed gnd in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the dient and any partial or whole reproduction without the consent of the client is prohibited. CONSTRUCTION TEST - G-SERVICES August 26, 2013 City of Cupertino 10300 Torre Ave. Cupertino, CA 95014-3255 Job No: J8359 Summary Report #28 I 6L)� i° • TESTING • INSPECTION �`EERINO - v I-ZECEIVED SEP 0`4 2013 Name: 2118 Rheem Drive, Pleasanton, CA 94588 • Phone (925) 462-5151 Fax (925) 462-5183 4770 Duckhorn Drive, Sacramento, CA 95834 • Phone (916) 419-4747 Fax (916) 419-4774 One Embarcadero Center, Suite 535, San Francisco, CA 94111 e Phone (415) 438-2357 Fax (415) 334-4747 246 30`h St., Suite 101, Oakland; CA 94601 0 Phone (510) 444-4747 Fax (510) 835-1825 CONSTRUCTION TESTING- SERVICES Summary Report #28 August 26, 2013 Apple, Inc. 1 Infinite Loop Cupertino, CA 95104 Job No: J8359 Job Name: Apple Campus 2 Mock -Up 10520 Ridgeview Court Cupertino, CA Permit #: 12020109 August 19, 2013 • TESTING • INSPECTION. -- 1NP-tRING Ryan Gouthro reported to Forrest with DPR at the jobsite. Observed placement of rebar for roof level topping slab. Verified reinforcing to structural drawing S202. One exception of slab step area which excludes topping rebar #4 at 12" each way, per 2/S201, at lines E-D.7/2.3-3. Per Conco reinforcing drawing sheet F5 and F6 dated 3/20/13 and email from structural engineer dated 3/22/13, changes are acceptable. Work observed was, to the best of Ryan's knowledge, in conformance with approved plans, specifications and applicable standards of workmanship. August 20, 2013 Frank Hernandez reported to the jobsite. Observed placement of concrete (mix no. 1561239, 28-day strength of 5000 psi, specified slump of 5.5-8.5 inches, 90 total cubic yards placed) for slab on grade, test building. Monitored loads for mix no., slump, temperature and time limit. Prepared cylinder test specimens sampled from pump. Set 1 Set 2 Slump 5 '/z 7 %z (in.) Mix temp. 72 68 (OF) Air temp. 67 68 (OF) Truck No. 3474 6037 Location North North corner west 5 Per Set, 2 Sets, 10 Total Work observed was, to the best of Frank's knowledge, in conformance with approved plans, specifications and applicable standards of workmanship. 2118 Rheem Drive, Pleasanton, CA 94588 • Phone (925) 462-5151 0 Fax (925) 462-5183 4770 Duckhorn Drive, Sacramento, CA 95834 Phone (916) 419-4747 0 Fax (916) 419-4774 One Embarcadero Center, Suite 535, San Francisco, CA 94111 • Phone (415) 438-2357 • Fax (415) 334-4747 246 30"' St., Suite 101, Oakland, CA 94601 • Phone (510) 444-4747 0 Fax (510) 835-1825 CONSTRUCTION .TESTII�TR �T-IGES-- August 21, 2013 Conner Hill picked up 10 cylinders at the jobsite. TESTING INSPECTION %- MMi r'II3EERING - - August 23, 2013 Tony Perez reported to Elias Martinez with DPR at the jobsite. Observed placement of self -consolidating concrete (mix no. 1414897, 28-day strength of 8000 psi, specified spread of 20-30 inches, 10 total cubic yards placed) for perimeter columns at C-G/1-3 pour A. Monitored loads for mix no., slump, temperature and time limit. Prepared cylinder test specimens sampled from middle of batch. Set 1 Spread (in.) 29 Mix temp. (OF) 68 Air temp. (OF) 60 Truck No. 3483 Location E.4/3 4 Per Set, 1 Set, 4 Total Observed placement of concrete (mix no. 1560709, 28-day strength of 5000 psi, specified slump of 6f 1 inch, 9 total cubic yards placed) for collector beams on roof at gridline C-G/1-3 pour B. Monitored loads for mix no., slump, temperature and time limit. Prepared cylinder test specimens sampled from middle of batch. Set 1 Slump (in.) 7 Mix temp. (OF) 74 Air temp. (OF) 63 Truck No. 6037 Location G/1-3 4 Per Set, 1 Set, 4 Total Work observed was, to the best of Tony's knowledge, in conformance with approved plans, specifications and applicable standards of workmanship. 2118 Rheem Drive, Pleasanton, CA 94588 Phone (925) 462-515,1 Fax (925) 462-5183 4770 Duckhorn Drive, Sacramento, CA 95834 0 Phone (916) 419-4747 • Fax (916) 419-4774 One Embarcad.ero Center, Suite 535, San Francisco, CA 94111 Phone (415) 438-235 7 Fax (415) 334-4 747 246 30' St., Suite 101, Oakland, CA 94601 a Phone (510) 444-4747 Fax (510) 835-1825 c:rs CONSTRUCTION -F G19RVICES .-- -- TESTING INSPECTION Laboratory test results are enclosed if testing was done during the period covered by this report. Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. � r k i . / 8/29/2013 Reviewed by An* Malone E.I.T. Date Staff Engineer Technical Contact: Timothy Casey, Senior Engineer (tcasey@cts-Lcom) Administrative Contact: Yolanda Deras 67deras@cts-I.coin) cc: Building Department — City of Cupertino Contractor — DPR/Skanska JV (email) Architect — Foster & Partners Limited (email) Structural Engineer — Ove ARUP & Partners (email) CTS PM's — Jim Doyle & Aaren McBride (email) CTS Staff Engineer — Jon Felts & Andy Malone (email) W 2118 Rheem Drive, Pleasanton, CA 94588 • Al Phone (925) 462-5151 0 Fax (925) 462-5183 4770 Duckhom Drive, Sacramento, CA 95834 0 Phone (916) 419-4747 0 Fax (916) 419-4774 One Embarcadero Center, Suite 535, San Francisco, CA 94111 9 Phone (415) 438-2357 0 Fax (415) 334-4747 246 30t' St., Suite 101, Oakland, CA 94601 0 Phone (510) 444-4747 0 Fax (510) 835-1825 . N CONSTRUCTION Cam'[ T[{ I=lec� s rlon r25_4t2.a15! ,acrca-.. nfv ,419-1,747 r 4,� a`lJI C1F4J eian7_l&:cr>41,5.3134.4747 SJ,.c.ilo SI111 Jo<e Ln ke �1r W. � , s-1 r: c �� Oclsin.,d 510.414A.d. 7 Field Number: 10 Laboratory Compression Test Project Name: Apple Campus 2 Mock -Up Appl No: 12020109 Project No.: J8359 Sampled By: Frank Hernandez Report Date: 08/23/2013 Client: Apple Inc. Date of Sampling: 08/20/2013 Lab Log No.: 83666 - 1 Information provided by Field Technician Mix #: 1561239 Supplier: Cemex Contractor: DPR Set: 1 of 2 ITruck #: 3474 Design Strength (psi): 5,000 @ 28 days iType Sample Material/Shape: Concrete Cylinders 6x12 of Structure: SOG Location: Onsite Location for overall North Corner pour: Location North Corner when sampled: Concrete Quality Actual Mix Temperature (°F): 72 Req'ment 50-90 Actual Slump (in.): 5 1/2 Req'ment N/A Actual Unit Weight (pcfl: N/A Req'ment N/A Air Temperature (°F): 67 >40 Air Content (%): N/A N/A Time Sampled: 7:30 am N/A Aggregate Size (in): 3/8 " N/A Time Batched: 6:24 am N/A Time in Truck: 66 mins <90 Mins. Information supplied by Laboratory Technician Date Received: 08/21/2013 Technician that received: JB Test # 1 Age of Test (Days) Date Technician Dimensions (inch) X-Section Ultimate Load (Ibs) Compressive Strength (psi) Type of Fracture Diameter Length Area (in') A 2 08/22/13 DM 6.00 12.00 28.27 80,080 1 2,830 Type 3 B 3 08/23/13 DM 6.00 12.00 28.27 104,070 3,680 Type 3 C 7 08/27/13 6.00 12.00 28.27 D 28 09/17/13 6.00 12.00 1 28.27 E 56 10/15/13 6.00 12.00 1 28.27 Remarks: L15 28 Day Avg.: '',.. - 4r y,. _ 08/23/2013 Reviewed by: Eric Parker - Staff Engineer Date 4STM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231 or C173, C470, C511, C617, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Fracture Key: 1. Well -formed cones on both ends 13. Columnar vertical cracking through both ends __ 5. Side fractures at top or bottom 12. Well -formed cone on one end 14. Diagonal fracture with no cracking through ends 16. Similar to Type 5 but end of cylinder is pointed Testing was performed by qualified personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited. Page 1 of 2 CONSTRU Ti N W+ W.Cts-I'COt3' -le r[on"25.a�"..a1- SaerornentD91c,#1 -4,74 S ar, F.ecn i�co 415 334.4}44 y � jcxe 408- Z3. 6,9 2 Lc Field Number: 10 Laboratory Compression Test Project Name: Apple Campus 2 Mock -Up Appl No: 12020109 Project No.: J8359 Sampled By: Frank Hernandez Report Date: 08/23/2013 Client: Apple Inc. Date of Sampling: 08/20/2013 Lab Log No.: 83666 - 2 Information provided by Field Technician Mix #: 1561239 Supplier: Cemex Contractor: DPR Set: 2 of 2 ITruck #: 6037 Design Strength (psi): 5,000 @ 28 days Sample Material/Shape: Concrete Cylinders 6x12 Type of Structure: SOG Location: Onsite Location for overall North West pour: Location North West when sampled: Concrete Quality Actual Mix Temperature (°F): 68 Req'ment 50-90 Actual Slump (in.): 7 1/2 Req'ment N/A Actual Unit Weight (pcf): N/A Req'ment N/A Air Temperature (°F): 68 >40 Air Content (%): N/A N/A Time Sampled: 8:10 am N/A Aggregate Size (in): 3/8" N/A Time Batched: 6:59 am N/A Time in Truck: 71 mins <90 Mins. Information supplied by Laboratory Technician Date Received: 08/21/2013 Technician that received: JB Test # 2 Age of Test (Days) Date Technician Dimensions (inch) XSection Ultimate Load (Ibs) Compressive Strength (psi) Type of Fracture Diameter I Length Area (in 2) A 2 08/22/13 DM 6.00 12.00 28.27 80,570 2,850 Type 3 B 3 08/23/13 DM 6.00 12.00 28.27 106,440 3,760 Type 3 C 7 08/27/13 6.00 12.00 28.27 D 28 09/17/13 6.00 12.00 28.27 E 56 10/15/13 6.00 12.00 28.27 Remarks: L15 28 Day Avg.: h-, < " - 08123/2013 Reviewed by: Eric Parker - Staff Engineer Date ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231 or C173, C470, C511, C617, C1077, C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39. Fracture t_ure_ _Key: 1. Well -formed cones on both ends 3..Columnar vertical cracking through both ends 15. Side fractures at top or bottom 12. Welt -formed cone on one end 14. Diagonal fracture with no cracking through ends 16. Similar to Type 5 but end of cylinder is pointed Testing was performed by qualified personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited. Page 2 of 2