13010132 - SI � RECEI�TEI� � TESTING ENGINEERS, INC. � JUN 1 �� 2013 2811 Teagarden St. 510-835-3142 510-834-3777fax San Leandro,CA 94577 800-660-3142 Name: San Leandro • San Jose • Martinez INSPECTION REPORT Week Ending: 5/24/13 PROJECT#57260 TYPE OF INSPECT'ION: Visual Welding PROJECT: PLACE OF INSPECTION: TA07B South:AOS Relocation Glazier Iron Works(shop) 10100 N.Tanfiau Avenue Cupertino,CA Permit#1301-0132 . DATE 5/22/13 HOURS 4 INSPECTOR J.Yoka Reported to Brian Rose of Glazier Iron Works at the shop as requested. Checked welder qualification papers(Carlos Cervantes,ID#6978). Checked WPSs and verified welding parameters. Verified proper elecirode storage. Verified proper preheat. Visually inspected joint preparation and fit up. Performed continuous visual inspection of the in progress welding performed by one qualified welder using the FCAW process with E71T-8 wire electrode. Weldments consist of 1/a"complete joint penetration groove welds,partial joint peneiration groove welds and single pass fillet welds jouung channel stringers to channel siringers,connection plates,bent checkered plate threads,plate and pipe posts; and pipe posts to pipe rails for ladder assemblies shop marked A21 and A24(complete). The preceding work was,to the best of my knowledge,in compliance with engineer approved plans and specificaiions, including revisions by engineer and shop dxawings D21 and D24,dated 5/15/13. � Reviewed by: David Chippero Special Inspechion Division Manager 1cc: Apple Computer Inc./A.Vu Hayes Group/S.Lee SW Structural,Inc./S.Wade XL Construction/J.Seacrist City of Cupertino/Bldg.Inspeciion Dept. This report can be reproduced only in its entirety unless written permission from TEI is obtained. Page 1 of 1 _ � TESTING ENGINEERS, INC. 2811 Teagarden St. 510-835-3142 �c�1 � .�1�834-3777 fax San Leandro,CA 94577 800-660-3142 JUN 0 5 2013 San Leandro • San Jose • Marlinez INSPECTION REPOR� Week Ending: 4/26/13 ame� PROJECT#57260 TYPE OF INSPECTION: Visual Welding PROJECT: PLACE OF INSPECTION: TA07B South:AOS Relocation Jobsite 10100 N.Tantau Avenue Cupertino,CA Permit#1301-0132 DATE 4/23/13 HOURS 4 INSPECTOR A.Gundersen Reported to Chris Martin of Sttmmit Welding at the jobsite as requested. Performed periodic visual inspection of welding previously completed without special inspection. Weldments consist of 5/16' single pass fillet welds on both sides of outrigger;and 5/16"fillet welds on 3-12" on center for angles. NOTE: Request for information: The following items are not in compliance with the approved job plans and specifications. These items need to either be corrected or a�proved in writing by the responsible en 'g�neer before the work can be accepted and a final report can be issued. > Detail provided did not indicate weld size,pattern or length,and did not include weld symbols. The preceding work,as noted,was to the best of my knowledge,in compliance with approved plans and specifications, including revisions by engineer,and Drawing A7.2,dated 1/25/13. �_ � -�.,,,.--�--�-�".�\ Reviewed by: � David Chippero Special Inspection Division Manager 1cc: Apple Computer Inc./ A.Vu Hayes Group/S.Lee SW Structural,Inc./S.Wade XL Construction/ H.Seacrist City of Cupertino/Bldg.Inspection Dept. This report can be reproduced only in its entirety unless written pern►ission from TEI is obtained. Page 1 of 1