HomeMy WebLinkAboutDesk Items �� '�� WELCOME MARKET INC .
1e V '
2931 Faber Street, Union City, CA 94587-1215
V\ � Tel: (510) 487-8899 Fax: (510) 487-8878
�o
Delivered by hand at Hearing
Public Hearing (ASA-2013-OS) at the City of Cupertino on 8/8/2013
I am David Lee, Chief Operating Officer of 99 Ranch Market. We have one store located in
Cupertino Village and we are the anchor tenant.
Thank you Gary and Simon for notifying us of this public hearing. This is the first opportunity
for us to express our concerns to the City of Cupertino about this project because we were not notified of
the Planning Commission meeting approving this project held in March of 2008.
First of all I would like to deliver a copy of the letter dated August 6, 2013 I sent to the Mr.
Vuong setting forth our concerns with this project for inclusion in the record of this meeting.
From an operation's viewpoint, we want to pinpoint that there are some key problems with the
Proposed Site Plan that are not practical and will cause chaos during the construction and after this
project is completed. We have also noticed that there are deviations between the 2008 Entitled Site Plan
approved in 2008 and the Proposed Site Plan which is the subject of this hearing and which, if built, will
be detrimental to public health and safety.
Truck Delivery Route & Lar�e Truck Deliveries
Trucks, sixty three (63) feet long make deliveries to our store. Most suppliers' delivery trucks
come from I-280, get off Wolfe Road exit, and enter the Center via Pruneridge Ave. However, Pursuant
to the new plan there is only "Truck Access Out" but no "Truck Access In" on Pruneridge Ave. If all the
delivery trucks have to enter the Center from Homestead Rd., they will cause traffic congestion in truck
circulation and the larger trucks will not be able to make the necessary turns from this approach so that
they can back down into our loading dock. Therefore, the delivery trucks should be allowed to enter the
Center from Pruneridge Ave.
We have concerns that the truck delivery access routes do not have sufficient turning radius in
the shopping center. TWA Architect completed a study and gave us a report showing that the 63 foot
long trucks can't make the turn into the north end of the parking structure and back down into our
loading dock when approaching our store from Pruneridge Ave. Therefore, the entry/exit at the north
end of the parking structure will have to be eliminated or modified and the parking spaces at this
location will also have to be eliminated. In the 2008 Entitled Site Plan, there were no parking spaces in
this area. We have strong concerns about public safety here because trucks will not be able to safely
make the appropriate turns to back down into our loading dock. A copy of TWA Architect's report is
attached as an exhibit to our letter to Mr. Vuong dated August 6, 2013 previously given to you for
inclusion in the record.
�� '�� WELCOME MARKET INC .
� V '
2931 Faber Street, Union City, CA 94587-1215
��o Tel: (510) 487-8899 Fax: (510) 487-8878
Delivery Truck's Sta��
There are many deliveries per day during business hours to our store and other tenants located in
the Center. Periodically multiple trucks arrive at the same time. However, there is not enough truck
staging area on the Proposed Site Plan and it will cause traffic congestion and public safety issues. The
2008 Entitled Site Plan had more open truck staging area. The new plan, which is subject to approval at
this meeting, reduces this staging area by the installation of additional trash compactors in this location.
The trucks will have to find other parking locations while they wait for room to off load their products.
This will interfere with customer parking and customers walking to and from stores in the Center.
Garbage Service
A lot of different garbage is generated by all tenants located in the Center each day. There are
two existing trash compactors for compost—one 16 cubic yard is for other tenants and the other 20
cubic yard compactor owned by us is for our exclusive use. There are also six dumpsters that Kimco
currently puts in our loading dock for recyclable materials and dry garbage—four for other tenants and
two assigned to us.
To handle such a huge amount of different garbage, Kimco has to (1) keep the two existing trash
compactors for compost "As Is" and (2) find a place other than the proposed location to install an
additional two compactors replacing all six existing dumpsters to handle recyclable materials and dry
garbage separately instead of adding a compactor to the existing trash enclosure. As stated above, the
installation of additional trash compactors in the location identified on the revised site plan will reduce
the parking area currently used by delivery trucks which will adversely affect customer parking and
access to the stores in the center. This plan imposes adverse effects on the public health and safety when
visiting the center.
Parkin� Structure & Sho�pin C�arts
There is always an issue that the Center does not have enough parking. The upper level of the
parking structure will be designated for"Employees Parking Only". But, employees of tenants will be
reluctant to park there. Therefore, Kimco must demonstrate an effective and enforceable Parking
Enforcement Plan and Valet Parking Plan.
The upper level of the parking structure is not serviced with an elevator. But we are concerned
about public safety when using the second story of the parking structure.
1) Kimco has not delivered to us or the City an Enforcement Plan to prevent customers from
pushing shopping carts up the ramp to the upper level of the parking structure to load a car.
2) If some of our customers push their carts up to the upper level of the parking structure, where
do the grocery carts go after they are emptied? Will cart corrals be installed?
3) When the carts are being retrieved there is a very good possibility of uncontrolled carts
rolling down the ramp. This will be dangerous and a possible liability if some actions by City
or Kimco are not taken now.
�� '�� WE LCOM E MARKET I N C .
� V '
2931 Faber Street, Union City, CA 94587-1215
��o Tel: (510) 487-8899 Fax: (510) 487-8878
4) We believe the parking structure should be serviced with an elevator and shopping cart
corrals installed.
To resolve our concerns about public safety and public health, we sincerely request that the City
of Cupertino consider adding our concerns stated in our letter to the planning department described
above and this discussion as key conditions for the final approval of the Application and issuance of
building permit.
The Application submitted by Kimco this time has been modified from the one approved by the
City of Cupertino planning Commission in 2008. Since the Plan was approved in 2008, five years have
passed, codes have changed, and there are modifications from the approved Plan in a very critical high
traffic area of the Center. We feel that it would be responsible for both the City of Cupertino and Kimco
to review and evaluate the plan to determine if it meets the current requirements to promote public
health and safety.
Very truly yours,
WELCOME MARKET, INC.,
a California corporation
David Lee
Chief Operating Officer
;���� �I
�� '�� WELCOME MARKET, INC. � � � ��j�
�� V� 2931 Faber Street, Union City, CA 94587-1215 /`3`G�'
�� � `�> Tel: (510) 487-8899 Fax: (510) 487-8878
�
t Zo�3 �:ECE
Au�s 6, IVED
via Email AUG 0 6 2013
Mr. Simon Vuong 9Y_ ��
Assistant Planner
City of Cupertino
10300 Torre Avenue
Cupertino, CA 95014-3202
RE: Cupertino Village ("Center"); Application Number ASA-2013-OS ("Application"). Address:
10825-10983 N. Wolfe Rd., Cupertino, CA; APN: 316-OS-O51, 316-OS-052 and 3I6-OS-O50.
Uear Simon,
Thanks for notifying us of the Adininistrative Hearing to be held on August 8, 2013, related to
Cupertino Village Redevelopment Project. Taking this opportunity,we would like to express our strong
concerns to the City of Cupertino (the City) about this project since we have found that there are soine
key problems with Kimco's proposed Site Plan dated July 10, 2013. We have also noticed that there is a
deviation between this Site Plan and the 2008 Entitled Site Plan (see attachment), which was approved
by the City in 2008.
WELCOME VIARKET, INC., a California co�poration, is the owner of 99 Ranch Market, which
occupies approxiinately 31,000 square feet in building A, located in the Center. Our store is the
"anchor"tenant in the Center.
In May of 2013 Kimco delivered to us the Cupertino Village Redevelopment Plan dated April
10, 2013 ("Vision & Concept Presentation"). 'I'his was the first tiine we were infonned of the proposed
development to be completed at the Center pursuant to the Application. In addition, we have since
learned that Kimco hosted three(3) neighborhood meetings in 2007 but Kilnco did not notify us of these
meetings or the City hearings on this project in 2007 &2008.
We believe that the proposed construction of additional rctail space and a two-story parking
structure in the Centei�will make an aiready overcrowded shopping center even moi-e impacted. Uur
custoiners presently are challenged with locating adequate parking to visit our store and the additional
retail space will only increase the difficulty and overcrowding, especially on weekends.
It will be great to see this Center have a new look. However, from an operation's viewpoint,
there are several key problems with the Site Plan that are not practical and will cause chaos ciuring the
construction as well as after this project is completed.
City of Cupertino
August b, 2013 Page 1/4
�►� '�� WELCOME MARKET, INC.
�V � 2g31 Faber Street, Union City, CA 94587-1215
�� �� Tel: (510) 487-8899 Fax: (510� 487-8878
���
A review of our concerns is set forth as below.
Truck Delivery Route& Large`I'ruck Deliveries
Trucks sixty(60) feet long make deliveries to our facility. Most suppliers' delivery trucks come
from I-280, take the Wolfe Road exit, and enter the Center via Pruneridge Ave. However,we have
noticed that on the proposed Site Plan,there is only"Truck Access Out"but na "Truck Access In"on
Pruneridge Ave. If a11 the delivery trucks have t� enter the Center from Homestead Rd., they will cause
traffic congestion in truck circulation. Also making a left turn into the Center from west bound
Homestead Road is not permitted. So trucks will have to circle the Center to be eastbound on Homestead
Road before they can make a right turn into the center. First, the 60 foot long trucks cannot make the
turns necessary to back down into our loading dock from this approach and second, this procedure will
increase travel costs and exhaust pollution in the area. Therefore, the delivery trucks should be allowed
to enter the Center from Pruneridgc Ave.
We have concerns that the truck delivery access routes for entrance, exiting and staging do nat
have sufficient turning radius throughout the Center and we believe that such long trucks cannot make
the turn into the parking spaces adjacent to the proposed parking structure then back down into our
loading dock. We have obtained and enclose herewith a letter from TWA Architect dated August 4,
2013 ("Architect's Letter)wherein it provides the 60 foot long trucks will not be abie to make the turn
into the north end of the parking structure and back down inta our loading dock (see Paragraph 3 of the
Architect's Letter). Therefore, the entry/exit at the north end of the parking structure will have to be
eliininated or inodified and the parking spaces at this location will have to be eliminated.
Deliveiy Truck's Sta�ing Area
There are numerous deliveries per day durin�business hours to our store and other teFiants
located in the Center. Periodically multiple trucks arrive at the saine time to complete deliveries. The
delivery vehicles park adjacent to the loading dock on the west side of our building., However, there is
inadequate parking area on the proposed Site Plan, which, we have also noticed, has a deviation,
compared with the 2008 Entitled Site Plan, approved by the City in 2008.
Garbage Service
A large anlount of different garbage is generated by all tenants located in the Center each day.
'1'here are two existing trash compactors for compost—one 16 cubic yard is for other tenants and the
other 20 cubic yard compactor is o«.med by us for our exclusive use. We have paid directly for garbage
service since 1997, and we do not want share our wholly owned trash compactor with other tenants.
There are also six dumpsters that Kimco currently placed in our loading dock, tor recyclable
tnaterials and dry garbage--four for other tenants and two assigned tc� us. Presently, the duinpster area is
an unsightly mess (see picture G-1, G-2, G-3, and G-4) and we have requested Kimco that the fout-
dumpsters used by other tenants be reinoved froin our loading dock. But they are still sitting there.
City vf C.upertino
August 6, 2013 Page 2/4
�� 'i� WELCOME MARKET, INC.
V� � 2931 Faber Street, Union City, CA 94587-1215
�� /� Tel: (510) 487-8899 Fax: (510) 487-8878
�
To handle such a huge amount of different garbage, Kimco has to (1) keep the two existing trash
compactors for compost"As Is" instead of asking us to share with other tenants, and (2) find a place
other than the proposed location to install two additional compactors to replace all of the six existing
dumpsters to handle recyclable materials and dry garbage separately instead of adding a compactor to
the existing trash enclosure located to the west of the loading dock adjacent to our building, as proposed
on the Site Plan.
Parking Structure & Shoppin�Carts
We all know that there is always an issue that the Center does not have adequate parking. We
also understand that the second floor of the parking structure will be designated for"Employees Parking
Only". However, we believe employees of tenants located in the Center will be reluctant to park there.
Therefore, Kimco must design an effective and enforceable Employee Parking Enforcement Plan.
We understand that the City reserves the right to require Kimco to provide valet parking and we
do agree that it is necessary and it will help mitigate the traffic congestion in the Center on weekends
and especially on holidays. However, we have not received Kimco's feasible plan of valet parking and
they have not informed us on who is going to pay the costs associated with such plan.
We understand that the second story of the parking structure is not serviced with an elevator. We
ask what is Kimco's Enforcement Plan to prevent customers from pushing shopping carts up the ramp to
the second story of the parking structure to load a car? If some of our customers push their carts up to
the second story of the parking structure, where do the grocery carts go after they are emptied? Is Kimco
required to install grocery cart corrals on the second story? Are our employees cxpected to retrieve the
carts from the second story of the parking structure7 How can they complete the task if they have to
control inany carts and take them down a rainp? The possibility of uncontrolled carts rolling down the
ramp is great and it will become a dangerous task and a possible liability if actions by City or Kiinco are
not taken now. lf these probleins can't be effectively prevented, the proposed parking structure should
be servieed with an elevator and Kimco should install shopping cart coi-rals on the second story of the
parking structure.
Duriiig Construction
During construction of the two-story parking stnicture, Retail A and Retail B, many existing
parking spaces will be eliminated from use. But we have seen no plan on how these parking spaces are
going to be replaced or how the contractor's parking will be mauaged and how the construction
materials will be staged during the construction�eriod. The Architect's Letter at paragraph 2 describes
the necessity for an effective parking plan for use during construction of the proposed improveinents.
We have learned that the construction work on the parking structure will start in October or
Novcmber this year. Dw-ing construction hundreds of parking spaces will be eliminated.
Cammencement of constniction during tlie peak holiday season will not only adversely impact all
City of Cupertino
August 6, 2U13 Page 3/4
�'� y� WE LCOM E MARKET, i N C.
V� � 2931 Faber Street, Union City, CA 94587-1215
� /� Tel: (510) 487-8899 Fax: (510) 487-8878
�<,:�
tenants' businesses,but also cause the current situation of traffic congestion in the Center to become
worse.
We have observed that parking is at a premilun in the Center and our customers have
experienced great difficulty visiting the Center to shop at our store. We believe that the proposed
Redeveloprnent Project will seriously and detrimentally affect our operations in the Center. We also
believe that coinpletion of the proposed improvement will adversely affect our ability to service our
custoiners, cause an increase in overhead expenses and incur loss of patronage.
For the reasons set forth above, we sincerely request that City consider adding our concerns set
forth below as key conditions for the final approval of the Application and issuance of building permit.
(1) The entry/exit at the north end of the parking structure has to be eliininated or modified and
the parking spaces at this location may also have to bc eliminated.
(2) Kimco provides and designates a stagiilg area for delivery vehicles to park while they are
waiting to be unloaded.
(3) Kimco finds a place other than the proposed location to build additional two coxnpactors to
replace all the six existing dumpsters to handle recyclable materials and dry garbage
separately and properly.
(4) Kimco provides an effective and enforceable Employee Parking Enforcement Plan, Valet
Parking Plan, and Patron Enforcement Plan to prevent customers from pushing shopping
carts up the rainp to the second story of the parking structure to load a car.
Thank you For your attention to this matter and we would appreciate it very inuch if our concerns
are resolved and our request as abvve is taken into consideration. We also look forward to having the
opportunity to have a working session together with City staff and Kimco for an agreeable plan. Thanks.
Very truly yours,
WELCOME MARKET, INC.,
a California corparation
�4 ��. /
.�..�
• --_`C�_.
-. -------_ _ _------
David Lee
Chief Operating Officer
PC: Gary Chao, City Planner
City of Cupertino
City of Cupertino
August 6, 2013 Page 4/4
,.,.._..a.�._..__._ ..._......__.. .____.�,_ _.,..'�.�.�_.w.w.__.. _.��. .�,�a�_.�_�
.� ., ..- �
.�.�..�. ...
�r a., _�11
,�rj:` �"""' UPPER LEVEL PAAK►NG DECK
� , >
.� ,,,
._____-- --,--- --------'` '°�..m._��
-�.
� ,•••""• UNNET LANE �_._ ___. ._
�«�.�•K..
: ;..�N..�... �
:,, �.
- . . . . . . . ..... -. �� j .E�. �
���..� _� .. �- .
^ ' ' �
f��� ,..t-,�;� ��� �._,
� ` t �t `.
PROPOSED EXISTING �� '•�k' •° � ���``�"��"� ` ' �
_ _ --- .. • -:,
�`f- `���� `r .� ` ���" ,�_.►'__°. � `z �°°j ,
139,052 SF BUILDING AREA 114,622 SF BUILDING AREA .�f+� �a�` , ,�,'� �"�'��4� ' ``S ; ' �'=--- -�-----�'----L_ j
j Y,�., . ..�` `...af� y � � D � f [
Af F
856 PARKING STALLS(6_?J1000) 714 PARKING STALLS(6.1/t00Qj �� ,`'� �' _,`�n, � � , `, � �ti '• g
21 HC AND 835 REG ' • � ," e ��
,,
..._ ..- ...�ti �-- i n-a�s-,ra;�.:?�.t. : �. ._.-- -_.� � �
36,564 SF PARKING DECK .�_°' �,'�,`' `'"+" __ y�������� r,
'-. `""' ,, ,•,� a
a 4A f�� % � j �''� P` �`,�� �
� .�� �� .�..�� 3 4'��\� `�J� Q
� 'a �.
``.................. .W...,.�, t , C.
_,,_,. , . �_ '" ��
.
� � .Y� � , �
___ c �
. . � � f gx ,..,.,�;•« ,, �' ; �� ' i w
� ,
_ , ;
�
_ .� .. ._.._ � � . ..,« . , ,,: �,�+,.� � , ;� g
� '. �. :'��;: ,l . � �.
� 4 � O
y�; �,...._. . ..�� .�• �i\ `� �.1 p�
j k 1! {�
wex� �.. {`r I�i �� G/ �� t��
� , _�_ .._ ____
� . �
Q �'� � _ $' . '
_ �af� ,` ;-..� is �
,.,
s ' _ �I� .' � n- .E f�� {
y� e_��� . . . r.
W � /��. , i� G
.�
__../ "► � . _ � I.
� ' t . ., . �� -...� ,ti � �
_ y
� F � ;$Yl'i4k�4i �: . .a�-� ' .f �Y'o'r�M: �.
i 1 � e°.
, r d----.........---._._.._� . � - .. frr,
i z.�
� : s.�,�t.,w�ct+,.�. [�as:as: , , , ae.-,.-
_ �._..__.�_ _..,._-`'��v�� �-�`� ' - y £�
� ^r:eaa tr i e�.!.er� z a►�...��! '� � ..,.� .7 '''```���f `x,v ..�
� `�'� � �.! .._�►—........... � . �_-....�..�� , :. /�rf % �..
�' �` ��y`-'s�'��.� ^+'fs¢'�sSY:�oi*i�> l`°°, `f f '� �'-�.,� _�__E t�
. ;
.
�� - • i � e•�w+, '
:� �,,,,��+ ?`�,� ; - `_ ; r " �j
�`s
. , , �
. > �
. . .. � ;
� � � �
_ � �g
� �y
.;s' '_' , , ` �.� , . +�"s�„,a''`��r a w°r's�'.Ia`!��`!� ` �,�5��'l�i�°'JF�"�'fi` R�'J`' •n`�t. E '�Y
_ n .
, .. '.s�' '� , , r?"y�`'s}'i` -
, . �
� ,��
. - .
. > _ . .
.
. , � , . __, , � _._ � + '�--- �:� �" _ ;��,-��.
_ ;
.
+�
� � �
� WOLF'E ROAD `
_� ___ _.� n_
_ ,�, _�_ -
_� .....�_ _.._ _.._ _ __— , � _...
__. -..__ __ —
.�._�_� ._ __ .__� - �
_._. �.._.__ �_ _ '
_. ____________� i ._... -
IT'�
—— .--.�
�.✓
3
CUPERTINO VIL�AGE ,,,� K I M C C� { �
REn�rY ,
I EXISTIN6 ENTITIED PROPOSED apFKNVG STRUCTUFE
Srt/200E 7/10i2013
! BUIIDING lEASABIF AREA(sa.h.l
EXISTiNG BUILOINGS t 7a.622 t t a,b22 I t 4,622 , .
EXISTING BUILDINGS FOR DEMQ
. RETAII A 15J55 15.02C -_---'--'�_ , �`W NEw CON!PACrGF AP.EA
PETAi�B S,675 3675 t�
TOTAL 6R055 LEASABLE AREA t 14,622 139,052 136,695 ' Z CHURCt+FARKIhG
J IMPROvEMENTS
g W
z� o�MOUS�
F PARKI"�GSTRUCTURE i6.56A i4.'25 � �a :xi.SiInC3RciAiL
TOTAL ARF�1 229,244 t 75,616 171,42Q a
__ _. ____^_ ____ __.... _
LINNET LANE
FtR=iRi1CK nCCESS ;
PARKfNG __�,�.._-._ ___ .___�...__ _......_.__
i
___._______ ___.__ --_.. _ _ i
� �
ON�RADE ?t4 6�3 6�G �"
STRIIC�URED 243 23Z , >,a��sa;=44: � � �
tatnt_�nR�c �,a s� saz � � �� � ' �,�� ���
�4_wei��i ��i�i.i�� ��.Y J�.i�A_a—�— ! ..3 �
t�__' -i.�.+�.a.�.` �\ � . - `'
L=�
�' ` - �
PARKING FATIO' 6 23 6 I6 6.1 b ` ' `;� ---
'S.�sed on gross teaiiWr,area , � �•�' � <1f� 1,�; �~r � .
, �"'. �' .. i . . � --_......
.{r ��i�4� S``"� ,,� �. • 'AUCKACCFSS;ry
i `;
� fRASf+ENCLOSURE EXISTNJG 6iJIlC�NG 4 -j�� °A, �
( _... �
23 OGd SF t' �'
EXISTING BUILDIyG 6 „ EX FFE 172 t ���� � \ �'��� ��GH'•QLT qiGHT�N
?0 pd4 SF {PER PA�LpNp OWG 6 5 2008) � t/, \l LEFT Ot;T
EX FFE• �67e TqUCKaCCESSCUT � , � LEF?In Fq���
� IPER PACIANQ 01YG 6 5 24CN) EXISIING B'J LD�N�1
31279SF \ / 'NeS'60UNC
-- ` f
EX fFE t'G 4 / ►h�M;S':EAD HOAC
— °--_� _ _ e , �,� t� � j NOT FERM!1TcD
- _ _ _.. ,,,? !, fPE17 PACUN4 DWG ti 5 200a e' �f' `Y�
• ���i �x�5ix�tGFftRl.�i�G:� f °a
,,�...._. ..��.. _.�.. �„ ____ _ \ . 19 449 SF 0
� (� __.. ____ - — -----� 3`'�. �" EX�E 1705 ' '� � n
��`: -• �r 1� tPER PACLAND�WG 6 5 2�08) °� �`� ' W
° � j
__.
`� 58 PARKING SPACES �` - �, 4� - u�i
' TNS aARCE� ? a ` ` `
„., ; w
i �.._ �°`°�..__ •,(. _,...__�%� \ ;'O,� \'z� [XISTtN.a?UIIJING2 �' ./ ,� .% ' �
. 4 � .. �. . " .. ..._.a_ {,. �.. 21 S51 SF �}'� /•� � .r 2
. �-..� �7(FFE_-1783 ' `� � .
'.._
w • � — ' ` � }{ � �
� (PFA PACLAND UWG .'
c __,__._. 6570081 � � ��
�—, . . t-' �/ ,.`
Z s , . . . = , �. . y+' }T �! • EXISTiWG fiU+IDiNG 5
r ..
a t� �f �'j �t'� `"°f 5�°SF
fif,rJ,,;,` t ����� ,��,,,� �'�"'�..°` �i�F�`} `�.. N�C
� ' _---- _ ' ,
..,�-��� — ;� ;PEF PACUIND OWv 65 2CQ9;
� t__.. --- E+ � u.�. �„ �^ .
c ;� ,��
� . :
._ ,
.___.._. .. _. �
�
—__ s_—__�....... ._�. i - ..__ _. _ .
EXtSTiNG @UILDI�G 7
--� 3385SF ____ ---.. _.. _ _
WCLFE RpAQ__.._ _ .__. __._
_.. _____ ___��_ <_... ,,,ev_. - _.
1 EX PfE-=167; __�._--: ��_ _ : _ _ ._. .,,e. __-__ __- _ .,_ .
(°E�PAClANO DWG 6 5 2Q8) ___ ..-...,,._,.
;
�D '',% �._ '
�' C�
4
CUPERTINO VILLAGE „� K I M C C� �
REALTY 4
-r
�
r
5 yW
, � �j
��
s�:�N N�'IJV;(-
-tR�'A�.�t aGCFCS
, �.-_.,>ti_, �__..n �._._�_re..._�. _ _ ,- _ . ______ ........_ _
� _._._w
L_�_��..� _�._._..._�l�- -- -� .
�; �-�- . - � -.- �-
/' . � `
, "f r�',�.�tr �' : - `'`�.
f� , ` -
� ' . ' !lti'!?r"..F5,i I.jhV.�d /ff�f t �
,�` � h�� �+ e 4 '�f rP`i�i�' \ �,.�f • �\
' _._... fF' ��+GN:+�1:�.A7«�;T1.ib1:':�CF,- � +t
_- ,�..__;�v�._.f�- �j Ccl'ir.C�N1:.t1/JC� �r �
_��__, � ��'rr cl�.'t,.44�)r{'���:,a rCCi! �~ + .
• . � ry�ST„�:';�'�.��NG� �
fouo�l �� i'`
�- -- -- _—• -- ---- ~1. Gt.rrF i:.i� !�
�;.
� . r.� v�!a naf,,..�G:?nG 6 5:�i[6 .
�. '�H�wAR`r::�'.��,.r� f�. ` ;� .
l •;� '�yc r,H1.11 ` � "• _ _ Eti:�'ih�� ��+,,.,. � �` r f
; ---� ii 55�5� "r �, ' ''
< riCCS_tr:� fr'�
O • �* 4� . „ ; ,., f` •'�
� t'
�y /
Z. • t . . _ , . . � /.. . .. - i -
� j ,��;� ?-`��."� ,<
� �f
' { .
. !�. a
.. . .. _ . �,.�_. .. v. ...�.�. . �' ..
�___ L_.- ..- _.
E�S''>,v 6_.J���•
; - lYOIfE ROAD
-
_�,.. � � __
���=ti:li�`.._.......',�k
CUPERTINO ViLLAGE ,,.� � I M � �
REAl7Y
_ _ __ _ _ ___ _ _ ___ _ ... __
� � ,.�R:. . . •
�''��`.� :i�'i..^, .i'� ,
/ � ..-�.�`�
.__l.e 1
l / '.i'iti.;, .
Or�/' �t'SrL~ ,
�
4
w
r
N
w
�
��y �... _..�.�
'� �� •. �J _i�_I.
�����
�� �-:
;���
����:�
August 4, 2013 ` �
Avery Lim
Construction Manager
Welcome Market Inc.
2931 Faber Street
Union City, CA 94587
Re: Cupertino Viilage
SW Corner of Homestead &Walfe Road
Cupertino, CA
Subject: Proposed Site Plan dated 7-10-13
Dear Avery,
I have been asked by your company to review the proposed "Cupertino �Ilage" site plan which shows
future improvements, and to provide my professional opinion of any potential deficiencies that may
impact the success of your existing grocery store, 99 Ranch Market.
Upon review of the proposed attached site plan (Exhibit A), I see the follawing issues:
1. New Parking Structure: In my experience, parking structures rarely work in a neighborhoad
shopping center as customers seek convenience, and typically have many options in the area
for their shopping needs. The idea of the using the second floor for employees wiil alleviate
some of these issues, however I have not seen any successful examples of this as enforcement
is very difficult; if not impossible. I would ask the developer to provide a detailed parking
management plan outlining how this would be enforced.
2. New Development Phasing: I would have to see a phasing plan, which was not included in the
documents I received from you, in order to determine the impact of the new construction on the
existing parking counts and circulation. Obviously, any construction will have a negative impact
due to construction vehicles, staging and additional cars for the workers. My main concern is
how the current parking ratio of 6.23 per thousand SF of shopping area would be maintained. If
access and parking are restricted, customers will go elsewhere. The timeline for construction of
a parking structure, or �etail buildings could easily reach a year in length, and customers will
have already modified their shopping habits by Post-construction. The fact that the development
will take piace in two phases will extend this time period to two years—enough to shutter any of
the retail spaces adversely affected.
3. Truck Circulation & Maneuvering: Like the enforcement of employee parking, it is very difficult
to monitor the delivery trucks as they will seek the path of least resistance to get to their stores.
920 First Street, Suite 202 ■
Benicia, CA 94510
t.707.747.1231
Site Plan/Cupertino, CA -2- August 4, 2013
Once again, I wouid like to see parking management plan which outiines the enforcement of
these chosen routes. This is especially important to your store, as it is the only store which
requires daily deliveries using a 60' semi-trailer. Of even greater concern in the plan is the
inadequate maneuvering area for your delivery trucks to access the loading dock. As currently
shown in Exhibit B, trucks would require almost the entire parking area adjacent in order to back
into the dock area. This is very difficult, and the maneuver further exacerbated if there are any
cars parked in this area (which is a certainty as cars will park here before they use the
structure). The only solution I could see was to eliminate this parking area, and reserve it for
truck turning only(no parking signs) It should also be noted that trucks having di�culty backing
into this space wili constrict what is arguably the main circulation through the site, thus
impacting the other tenants—both customers and delivery vehicles.
Finally, it is my opinion that the site plan as designed will have an adverse effect on your store, both
during construction for the next 2 years, and into ihe future unless the issues above are mitigated.
Please contact me if you have any questions or need more information.
Sincerely,
Tom Wils chitect
Tom Wilson, AIA
Enclosures
cc: WM{02/A-1
. . �, . o � . .
EXISTt�:� il,TI�lEO PROPOSEG P������ �'/y�LW�'� p,Q/� j� !N/ �
c+l.'10G3 7�tOc'0:3
'! ! �r/��1J L7 �
St;�,��1.Sh�;F n�E�,jti..�N] �
;XISI"iu6LIlCINGS '-622 tt�,52z 1;4,62Z nzy�ctse�tvet
eX15���6t;�lGINGS n1�GEF10 F
SETAIL A 15 i�5 15.42G 4 "�� �� � vcvr CCt,���..^0���_F
4FTAll S 3.675 S.5?5
rpTAi.GR0�55 IF�E�EA ��a,622 �39,052 136,695 u, c�+u�'PnP�ev"
�P.R!:9�YSiFt,CT�JRE ?G.55: 34.'?`- •- � WU �'iLt,rLK A'i�?�(/V��/�,.5 »�PpC�E►d�S
TOTAL+�REA 229,2<d 175,616 17t,s1p a� � ���
� �a \S� �%'�H'18j 7 r'y�r �aStu+G a�*ai
.:4.4ET LANE
FIi�TRIY'KACCFSS
'��Y•!I:G J"
� __ __ ,,�_� ,.`.b.»,..�.�._,._.
ON GP..^.iE ?tA C'3 0'� �
:TriU:�:i,E7 �43 2?Z ,�os►�ccs�i[vn� / e
TOTI,I P,iRIUNG 714 fi56 812 i .
l. � .. _ . . _ ' . . _ . � - - . . .. � . .. , � ,.•.:�..
=�t�� � _. � �� �o-vMtor
f�� � ��
�ARr(Ih'G v+�lJ' 6 2', fi 16 5;6 .. ` j . � E�/
. r
•< <� f
�REfAIL B f tl� `� —"+ • T�JC,X.ACCESS'V
.f ,�' -' -t-i�+tT
i j� �r
TFLASk E,VC_OSURE 'q f FJUSitMG Bi!:�tNG 1 ,�cr f,?�, .
i`:,
O(S'iWGG43DINGG `�V`l �� EX:FE 1T21 .%f ; �.�• �.� AGHTOIJT R?GKf N
10 C+�SF (PE:R PF41N�U4G 65100� / \ li."'�-.;'
EX FiE-!6T I ����
;vca onc�w��a szooei
�..
4•.
w�
�
�
z�
7_
�
�osnHc e�xn�r�v
— 3,385 SF
Df FfE-t6�1�—--
�PEA�AQNID�7NCs6S810B}
•
�?�.ti;.a� *�
`r�-+.i`�Ai�.� �
•
CUPERTIRfa VI�LAGE
�'1(r.ar°T'i:s�'.!i�
`�.:s9£!
EX ffF-�`D5
�x A 4'+1;:�.14iY?L�+K'a 6 5:xk-;
� r " •
•
{ ReiFJL A � �,�,,.
i
s
..w �.. � i��.� �, �
�nsrir�eun�:w z
z:,ssrsF
pt FF:-i T8 3
(PEA PACIA�'J OiYG
6.52006;
WUIFEROAD'
❑
�_ 3
( {,�GT�N F:3QV!
� ; +�srerxA+a
�.� � �o�cr�n ao�
� NOT pfAh9'fTFD
ij
6r
K
k'
N
�
� �
�(IST7UG 91JI1D1�5
59W ST
wc
r�'.A�,e�uwo o+,vc c s zooe�
ti t�
�X���/7 � — —
9 9 rz,4r•�.n� �+�n-1�t�
f��S�/3
� — ``� � �_
�
BECKER t ANE)
p��o S Fn F n� o� s7�c�vriE.
� _ _ �
I I � � � . l � � m�, TI .,.--- D�sr a , � �
0 t.EVEL 1
_-�
._, ..
vG a
1
3.5.2008)
r
�!�, �:
� � ' i
,�,�„,.........�........�
� j �\�`�
q /J � `�
,�f , �
,
, � ,i
� .�
�" :'�' \
�
t,
°I� R�r�c,H a'���'
.
31,273 SF
D(FFE=17Q.4 ,�
� �� r ' -
..,n� �.4�c-K;ni(�
E�STiNG
� 9lJILDiNG
/ NOT PART QF
PROJECT
___..1
� �--
4 r"'
�� �
� € � � �
� � � _�/��
� ,
_, l ;
�i 6 �
�
`_
0
�t � O
r �� � �
�� �� � g ;
. �� ,�
�C��l 7 ,8 :
q 9 r�� ��'u�-r
r����y �� ��Ss
�/s�i3
..._.�_—_.��...__..�_�.�......., ��, � 'P
.... �r„
�" ..
�
� „� ��
y ; '
�� �
�,..�_
� F
, , ... .:
� __ ___....., > �.�.
�,�,,� 4� ! •14 �'�Y F �'
. �. �q� ��� ��
� �j`', k� Y -� *,�r
�',,+�'�."•,< A:' h,��".,t. +�a°"u° .,;�., � e ..� ���.�� � �:l�
.> � . . :.:. . . �. � ..�.
<-��ww.ankw..nA+w.:: . � q�'�! . -''�� ... �,.,�",-�.»..,.w .
. ...�.� :� �� . .�...
b �y '
, . a,,., �"e "
a ,�;,. '�«,,,.,,.. � �
F.�,s v.�a .. . `��, .,..�... � .�,,� .�
.. 7,' � . "�' �NK '." '� - .... .,,.....t. .._.......�.�..w..w......�.......�.
... � `
�" \ � '- ., .. E.... _ . ����,�:.;..,.
. a°��
a
� �� ♦
� .. � „ �w..�
���' '�;.�
,.i .,.... -+.'"w.
i yp;'""" � q ^+
i,`u�a °Y� �°l m ' ,. .�� t .w
i a
r
�wa���.n.�,��.�..
. �w��
, . � �
, �
'� ' � w..,. ° `• °'y�'�M i „M.��. �
.
»� .� .. °w, ��:o �:. � � ..
� ., . , �,,,� ., �,- ..,
' °��p b . :.« ,.„, "* x .. . �n ,
G-1
.., ��,w� _..
_
�V �a---
� �+'I, . �,��r. .
` •w� � ,� `�=�,.�„w��
_�
: " .
_ _
, � �_�
� �
`.;�,
� r ,
�. � , �,��' �-�.� ,�� ���3 ������
€ '�='^ti � ` °
d�
, �
� � � � ,,
«.. �
. . , r
� � �w!oR
���� ... e:� , ;..�' i �
-- . '� r ���,
, � � . ` �
� ,�; N
�,
.,,
.,.-..�._..�,,. ,
> e
�; ��r
,.
� ��
. , '.,�.,' � �^ ,� �
., _ , �
� . ., ,; ��,, a„
y �� rr o
� ._... � � _a. � n; n
.�a. �;' „,�t „`�y ��.� . .,
. �n.�-
� �
,„,�#� • �ua�,,.�
D U mpS�E��":� ����C� �3�" � ..
.. �� �
o t h e r t e t���t� ��� �" � _,�, .,�.,,� �
�, �m �*��`�
> ;��`. �, ., _
G-2
Dumpsters used by
99 Ranch Market
Existing Trash Compactor used by
Other Tenants
�� � '�h-�'��`�*,?�r� �,.
.� • � �i• ��
n t ..;� ��k..
��'� �.�
�� �: �r.��.
a �� �
° � ����- r Y����� i
Y." �'
`"Pf"e�.�I. ..I' � �
w,
:�,:wy�
.y� . �J::'.
# �° .r����,{�...��y, � � "°�.�'�'� �� � '� ."y�
•�If>*X. /.�" � . �� j���i Q �
� Y� " ♦ • i
��g � '� ��•�MY �"\ �r _ _^��� �.� ..a.
,e�yi{:';".'. ��� �..w,.` _' ^ �4 �. � .� �Iw„' � e��.r
.$;� '� ^ ` . ., � f �"^..w..y �y� .�1 f��
�� � Y x �A..:.3....... sq�P � � ' ..
:
�� �. � � � s•� �-„�.,,t�„ �
�
�
r ;,,,
�. , , �
� � .
4 ..
� .
--3�,..:}� • ...
_. � � �.�
.. ..., � C;,;
�r� rr.,�, a.��`.
, � � .
�� A mn�M ��. s �..
�� �
,��$�r�" �� �b�+N� '� ... ��� Y" P �` k§a � e
*�' � m�,�,�- .��``� .�s* �:�h� .
,
,,
, �,��
� ��. �a _:�; � o
� �� � ,,..�,�^'
�,,, ��. �, M,� F �a� �.� '� '����6'
����., . ' �` _M1� � , p-� ��'"�`�4�� �� ..%,+�'�
�'��. 5Ne� ,�'3Y�"t#. � ��µ '�..f�" .� t°"� -�., ° .�
�- �ya,x,«�"� t 7 � R�° F� '�k� .E:+ :�
�}§� �...rh�y°�' �S�a �.. ' � �
�
,r :��ff ay� "�R> � .� �.
n,�' .:k�.. ;r.',
G-3
...�.. .,�.
`� _�: ,�
� -
; .
� •
! �, ,�
, _ , � ,
.� ,�_., . , .�r.�.,.. y � ,�
..._...,.N....., , . ,
� 2 , • �'
;
, l ��`;
���r ,
,,, P � —
� T_.
���v. .w �. +�� . . '""
�
Y - � � �� - �r �.�.../�.
� � � �
� . � .
� ,,,.� .
� � �t.r.,.a_ � ::� ,..�. _W.._..._.. ..._,_,,._._I
.
�
�'"'._. � �...m...�..dr,; ��� �"*=t �,. ,�,
� �.. .�.. '�--:�....�_,"� n�� `
�� .� ��r ( G� � � ;��f
1�
. . P
. �� 7\
s
� ` ` w"'
u :
./. ""+
1 .... r �.���
.,•,yA, .��,.
������ ,, �;�lN4 �� e � �
,
.- _.
.
e' "''3
- .�.
, ..
, =�
o � e ,
, __ �,�
� � b
m
��
�
.-
� ,, .
�� '��` �� ��_ � -„„..,.>- .s � �.�;. �. �'��� �,,.m..;�
� ,�; ., . ° ' �g",�� ���4� ` l � � �„ , "�A , �i
, , .
,� �
F ,.
s . • s
�. ,
,� �!y.�r ..e ♦ �.r '-, . ._, � � �y �°�`i
.p�i:. ���� a/.0 � � yw.� ., iv�lU�tk-F . .. � �� $k'� � � -
'.�Y �.. .„,,,°,,ar ar � M , .�� '�j,.. �� � ��'` �Ms
�4 ,� µ
�'��' A�^�' ""q,� � ��d�+w,, �� . . . � w'.'�.,t ' x..'�, ' ,e�,. �a.,-w�'_ .
# .� d , , �
°+n. �.��6.u:a � � �d��a"���"�4 � � �, �d.'� .� �p,,.._.��+�+1�a �.c x �.„/,�,,,* �.�,� '.,�
Y � ��" r,� �""��"",°`�q, "a�°"�r r'�,��,,� �.� .�fi, .�^x . ..� _t
,�� .� �' �^di��. ,a'" � "� J:'� wr .:�""" �
.M }c N'�.,,�, ,..
.
� e�,r��.. � . . .=id:'�.�.� �m'w-�'^��" ..,. .. '"�r".;^ .. , .. � ��r�aK,.
G-4
EXISTING ENTITLED PROPOSED
5/112008 7110/2013
BUILDING LEASABLE AREA(sa.ft.)
EXISTING BUILDIN6S 114,622 114,622 114,6ZZ
EXISTING BUILDINGS FOR DEMO I h?�
RETAIL A 15,755 15,020
RETAIL B 8,675 8,675
TOTAL GROSS LEASABLE AREA 114,622 139,052 136,695
PARKING STRUCTURE 36,564 34,725
TOTAL AREA 229,244 175,616 171,420
PARKING
ON-GRADE 714 613 610
STRUCTURED 243 232
TOTAL PARKING 714 856 842
PARKING RATIO' 6.23 6.16 6.16
'based on gross leasable area
1FiASH
DOSfN�G BUILDNJG 6
10.044 SF
IXFFE=1H7.4 ���
(PER PACLAND DVNO 8.5.200�
— - - - _ 7 \—_
� i �
E
C
E
I�i
E
D
PAWONG SifilK.'TLFiE B Y
t t2 SMCES�1PVa2
Deviation ri2- '�
w
Original Approval in 2008 has open ��
staging area available � — �
_ 6
LINNET LANE�FORMERLY £R LANE)
FlF�TR��iKACL'ESS (A PUBUC 57REEn
1A STAL6�tPVa 1
.
�� .
�
DOSTWG BUM.DIMO
� ?3�004 SF
� D(FFE-1721
(PER PACLMlD DNA Q5.2D01
E�STING BIA.DING 3
79,MB SF
��_,�s
(PEA PA�CI.APID DVK3 6.52008)
r DOSTIIr(i BUIIDIPq 1
31�7p SF
IX FFE-1 T0.4
(PEA PACLAND OMIG&;
Deviation#1-
Original Approval in 20o8 was without
outdoor parking
onsrw
eunra
rarw�maF
A+a�c.�
NE1M COMPAC'fOR AREJ�
CFRJFiCFI PA1iCIN0
M�IPRONEIYIB�ITS
D9dOLISM
OOSTNG RETAIL
�
�TRUCK ACCESS N
i_
�—� RlfiliT 011f�Fil(iHT IN
\ LffT OUf
\
� � � LEFT Mr FFiOM
\ f / YVESfHOUND
/ I�OAIESTEAD ROI1D
�_�i WOT PEF�tTTED.
� ��
I �
I �
� y
� 5B PARIONG SPACES // � \ , m
�I W�
` iHIS PARCEL D0STING BULDrJO 2 �
i �`
>� I I 27.557 SF _ �I
w� D(FFE-178.3 =
�� • ° �6�� —
' wm ' i . . . . . . . . -
za I . . _
�� i ' � � —
a I � i RET11�A i i
✓ � i i � i i
� � I I I I 4
1
� i i i i i '� %
— — — 4 — — — — — - 4 — — — — — — — . _ —�
E70ST1NG BUN.DING 7
3.3�SF WOLFE ROAD(�auecic srne£r
D(FFE�187.4
(PER PACLAND d1N'G&5.2006)
a❑ ❑D �
�
CUPERTINO VILLAGE � �= K I M C O�
� ,;: •.r..
° ` REALTY
�DOSTN(i BULOMJ(i 5
��
NC
(PER P/rCIMID DYMG 8.5200�
�
�� '
N t�
0 ?5' S0' tilD' � �
4
► �
� �
� `J
� �
i
�
��� � � ��,C��
Simon Vuon � � � � ��
From: Andrea Dorey[spinnstr@wrytor.com]
Sent: Monday,August 05, 2013 8:31 AM
To: Simon Vuong
Cc: Caroline Yacoub
Subject: ASA-2013-05& Hearing on August 8th at 5 PM
Importance: High
Categories: 24-Hour Response
Dear Project Manager Vuong,
Have there been objections filed against the modifications to the 2-story parking garage and
the two retail buildings at the shopping center?
How many have been filed?
What are the major objections?
I won't be able to attend the scheduled hearing on August 8th, but I would like to know this
information and how it will affect my house on Nightingale Avenue. We already have an
impending problem with overflow parking from the Apple Campus expansion across Homestead
Road.
I am concerned about further pressure that will affect property values.
Much obliged for any information you can supply.
Sincerely,
Andrea Dorey
property owner
1
t�:�,�n. � I � � �
� �
�
Simon Vuon �r� ��
9 �
From: Simon Vuong
Sent: Thursday,August 01, 2013 12:43 PM
To: 'bharathkumar@yahoo.com'
Subject: Cupertino Village Permits
Attachments: U-2007-06 (Reduced).pdf
Bharath,
Thanks for speaking with me earlier. Please see the attached plan set from 2008 for previous the Cupertino Village
Expansion approval.
Also, please also click on the following link for the current plan set for the Architectural and Site Approval (the file is too
large to email):
https://www.transferbi�files.com/31f8d6ca-4150-4902-aa92-5861acdOd56e/OaZepLU LOKhLzX6j 16UeVQ2
(the above link will expire on 8/5/13)
Thank you.
Simon S.Vuong
Assistant Planner
City of Cupertino
(408)777-1356 8-1-201>
simonv@CUpertino.or� -I �iaE�s�i?-co���ler�c�f L,il�ner L�� �La�rk I:a�
-L'loved h��rc: 1.:�v���rs a�;o
-Ct�mce�rn:5 about 2nc1 1c>�v���1 of parking
struciur� Ic�cikin�acros5 the 5tre.et into
hou:e
-�1�'orriec�about kid�:loitE>rir�};in shc�pping
ce��ter
(�08 j 3=�Q-i2t)1
1
�:��� � � ���/�
�� n���
Simon Vuong
;
From: Andrew Miner[aminer@sunnyvale.ca.gov]
Sent: Friday,August 02, 2013 9:01 AM
To: Simon Vuong
Cc: Aarti Shrivastava; Hom, Hanson;Trudi Ryan; Gary Luebbers
Subject: Comments to the Cupertino Village Project
Hi Simon-
I had a chance to review the revised plans for the Cupertino Village project, along with the conditions imposed
for the original project approval in 2008. I have not had a chance to review the current staff report, but wanted
to give you a few comments and questions regarding the project, specifically as it relates to the Sunnyvale
neighborhood adjacent to the site.
CUPERTINO VILLAGE RESUBMITTAL COMMENTS
1. Parking garage:
a. Will green screen along Linnet Lane be the same general design and expanse as what was
approval?
b. Is there a continuous concrete wall that extends 6' above second level parking deck, or is
what is shown in sheet 27 just the column?If not, will there be continuous solid surface for that
6' portion above the parking deck that prevents lights from parked cars to shine outside the
garage structure?
2. 2. Parking lot lights are shown on the elevations for the proposed second level parking deck lights in
sheet 18, but they do not show on the entitled elevation. Where on the deck will the lights be located?Are they
close to the edge of the second level?How tall are they? Were lights shown in the previous proposal? Has a
photometric plan been prepared that shows the level of lighting on the roof deck and the amount of spillover to
the adjacent residential area?
3. 3. It looks as though the parking garage has been moved closer to Linnet Lane. If so, how much has it
moved?
4. 4. The parking lot is shown to be restriped. Is there an overall change in the number of spaces on the site?
5. 5. Please require the Disclosure of Conditions to Tenants (existing conditions#27 and 83)to include
language about no parking on Linnet Lane.
6. 6. Will there be changes to the conditions of approval from what was originally approved, specifically as
it relates to the Linnet Lane neighborhood?Conditions such as:
a. Will a construction coordinator be required? (Section III, 3)
b. The requirement for a screen wall (#18)
i
c. There is an apparent conflict between conditions 19, 75, 41 and 97 regarding driveways
along Homestead Road. Conditions 19 and 75 allow only right turn in and out of Homestead
Road, but conditions 41 and 97 allows a sheltered left turn out of the center as well. The new
plan calls for the sheltered left turn. Is that the correct design?
d. Are the neighborhood signs (#20 and 76) still required?
e. One year review (#30) still required?
f. Is the garage construction still reGuired before work begins on the new retail buildings
(#33 and 89)?
g. Will existing conditions 56 and 112 be removed given the Apple 2 proposal to close
Pruneridge, or will it be amended to study alternatives should it be closed?
h. Construction Management Plan (#59)- Will there still be reference to no construction
parking or traffic on the residential streets to the west?
i. Is the condition to require the noise consultant to review the garage plan (Noise abatement
#60) still in place? What is the timing of that review?Prior to issuance of the building permit?
Thank you for your consideration in these issues. Please let me know if you have any questions or comments.
Andy
Andrew Miner, AICP
Principal Planner
City of Sunnyvale
408 730-7707
`°"�Save the environment. P(ease don't print this email unless you really need to.
2
ti�w� � � �'������
�� ���t� �
From: ������
�
The Neighborhood of Linnet Lane A�G 0 5 2013
Contact: Dean Fujiwara �/
1725 Linnet Lane BY'
Sunnyvale, CA 94087
Phone: 408-857-1596
To:
Gary Chao,
City Planner, City of Cupertino,
City Hall,
10300 Torre Ave,
Cupertino, CA 95014
Date: 05-Aug-2013
Ref: Regarding the proposed construction of additional commercial buildings and
parking garage at Cupertino Village (ASA-2013-OS).
Dear Gary,
Thank you for sending me your 7/23/2013 email outlining the scheduled meeting
on Aug. 8, 2013. As you stated the scope of the review is only on architectural
and site details. After reviewing the Kimco's Architectural & Site Approval
Submittal dated 7/13/2013 to the April 17, 2008 Letter and approved drawings
dated 4/15/08 from Cupertino City Clerk, there are many changes that go beyond
the scope of just architecture and landscaping details.
1) The changes affects parking stall the number of parking spaces are less than
the 855, an absolute minimum specified by the city council
2) Parking structure modification —the second floor of the parking structure is
being modified and it is bound to affect sound propagation
3) Traffic concerns due to parking structure changes— defining the delivery of
truck and trailer route that impacts traffic, the reduction of parking spaces
and encouragement of unlawful deliveries during after hours,
4) noise concerns due to 2nd floor parking structure changes—the wall design
has been changed where at one of the meeting sound data was presented
to the neighborhood to show that sound would not propagate to the
adjacent neighborhood and now the design has been changed and noise
will go into the neighborhood,
5) Toxic cleaner clean up - concern due to the proposed demolition of the
former Cupertino Dry Cleaner which is undergoing clean up with the DTSC.
A certification for DTSC is needed before the clean-up site can be touched.
The work is still going on today and is not slated to have its certification
until the earliest in 2014 and most likely to slip into 2015 according to
DTSC.
6) The second floor garage has changed —The ramp toward the church is been
deleted to allow trucks with trailer to now delivery their load to Building 1
loading dock. In doing so the parking structure on the bottom is open to
access from Linnet lane as per Kimco's drawings. See detail concerns
below.
7) The changes of the incoming truck route will have impact on traffic on
Homestead road. Are you taking this into account since the Apple 2 EIR
already give the Homestead/Wolfe intersection bad grades. This change is
after the Apple 2 - EIR 7/25/2013 last public comment date.
There are other changes not mentioned here but are very relevant to this project.
The neighborhood members have reviewed the plans, both the approved (from
2008) and the proposed (from July 2013) and we have documented all the details
in this letter. Let us discuss them all.
The changes that Kimco is proposing goes beyond just Architectural and site
approval of which you indication that only colors and material were to be
discussed.
Please make this part of the official record from the public for the Aug. 8, 2014
Design Review Committee. The information contains is too much to be
discussed by a 3 minute presentation (10 min by group).
The neighborhood wants City of Cupertino to enforce the Use permit requirement
as per the 4/15/2007 letter mentioned below. Also we would like to have
answers to the questions concerning the proposal and Use permit as addressed
below.
The neighborhood would like to know of any changes to the Use Permit and be
part of the Use permit change process. You indicated that the Use permit was
extended to 2013 and was modified in 2011 and the community was not
notified on it.
Conditions that must be done to before getting building permit per the 4/17/2008
letter from the office of the city clerk are listed below.
From the Cover Letter statement of that 2008 letter, the following items were
noted upfront:
■ The center sha�l prc�vid� �t Iea.�t 8�S phy�ical pa�king spa�s a�th� gr�und �(�ot i�cluding
t�e�xtr�stalls�auzied.a�t t�e c�wrch�
* '�fie�pplicaut��:a1I worlt with s�affta r��'ine thc final�arkin�plar�a�ad�btain fir�a�d Pub�ic
�V'ark� d�aartsri�nt appro�al prior ti�i�st�ancc+�f buildin�perc�,?t�
� �J4�ith tl�e concu�rcnce e�f the �hurch ba�rd, I�imcc� sfialll re-stri�� th� c�urc�t parki�g tot t+a
g�e�tr�st�.11s �or the chwrct�
, Gour�c�� r���es th� ri�ht t�r r�uire �p�ieant'prt�p�erty� a�,�nc:rr t�a prc�vid� ��I�t ��ricin�; if
n�et�ed
■ S�ve �ne big t�e� Ioeated at th� sout�iw�t cc�rn�r of th� ha� p�arc�el �ud alit�w st�
di�cretic�n�r�review i�e c��a�r mi�or tre�� :
� Prc�vid� a �ne-w�y righ�t-�za a��y ��es� �iri��eway irn�rt�i�t�lly nt�rth Qf the �uk� c�f
E��bur;g�i alt���t�te'►�r�c�Ife Ro�d s�aopping c�ttex�£r�►r�ta�e
Likewise, rest of our comments/concerns below are related to items quoted
directly from the USE PERMIT. Please help us understand the scenario and
alleviate our concerns.
3. �C)1�SfiRUCTIU�'w1 P,�APy1+GE�:'+TT°P�.AN
� r,�n�tzu�tic�a�ma�,g+�rr�e�t plan�hall be pro��d�d to incIude�u�nt�t li�t�ci ta th�
f�Il�w�g��asure,s:
�.• �Go�..stru���n schedulel�ura�iar�'mr�i��a�ai.�nt�
•.+ In��n�o��ite emg��oy��n�a°a�r parki��.g.
ki* �1.Kir�`� 16 V M�I.W��
,,• �i�:�co�zs�cictic��''��ffi��ign�ge:
*, B�t�,ag�emez�t gra�kic�s,
•.* I7t�st c�z�t�l�
•:� 5p�ific �r�g�r�te�ctio�zz�e�,,,�ures.
•.* �Ta r;��t�u+�iofl��rking ar tr�c.�ha.i�+�cc.�r o�a�xe r�siciezitia� s�ts t� �i�,�est.
*:* ,t�h�ttin� sh�ll b��stablish�d�i,��t�i�cans�+c�z+�n geriad for th�ad,�a�t re�i�i�ts tt�
r�r�any v�ic��aric�as c�r c►�n�. '�I'�e hc��in� i�.fc�rm�tit�n shalI b�e po�ted�rm��e
prc��a�rty o���r's w�ebsite az��d ��appro��at�e ica�ati�a��i�e c+�z�s�u�tz�� �it�.
Said�1� shall b�r�vze�red b��ae�ir�ctc�r of�ant�unit��evei�pzzaezz�t prat�r tc�i�suanc�c�f
buiiding pern�t�.
The neighborhood would like a copy of the construction management plan as
described in the USE permit, reproduced verbatim below.
4. �(.�ISE ABA'T`��1'rIT
Tl�ie fu3a1 �arage plan shall be reviewe�by the�roje�t n�ise cc�n�u:Itan���11in„�wwc�rth and
R�d:kin�t� ens���.t �� of t��r�co�n�nd�t���r�ut�i.�ed��t�e mois�r�rt dat�
�Qrf�i�er 8, :��3�?�e su�ici�n�Iy��dresse�. '�is in�Iud�ss but n�t li�aiteci t+� th�rec��red
r��is�a��e�uatic��pr+�p�rti�� Qf the gara�e p�m�t�c'�r�l (g��und lev�l a�d s�ccyr�d I���1�
alQng Linn�t Lan�e. .
Refer to "Sheet 8" of the drawings (Page 41) of the 2008 letter (old plan) and
compare it with the new plan dated July 10, 2013, Sheet 27. The following items
stand out as the clear discrepancies between the two:
• Roof screen: Per the old plan, it was contained "within" the garage wall
whereas per the new plan, it is sticking out entirely off the outer edge of
the garage wall.
• In the upper level parking deck, there is separation between the garage
wall boundary and the point to which the cars can back up. It seems to have
been removed in the new plan. The new design gives an unhindered view
of the homes on linnet Lane to anyone that is taller than 6'.
Since the plan has been modified the garage plan has to be reviewed by the
project noise consultant (Illingworth and Rodkin). Note the residents now are
living with noise levels of 40-45 d6 A Slow at night and would like to maintain that
level or lower.
5. �I)QI���i�'E���r1T
�Il n�w r�staura,nts ��iatl �st�.il odor filtra�tic�n�yst�n, Cki�r �It�.�an plau�h�1 b�
�cevi�re�i �d a�pr�ve�by t�e Cit�r pnor tc► is�u�c�c►���r bui�+�ir�g p�rmi�s.
Has the city reviewed and approved all odor filtration systems that are required
prior to issuance of any building permits?
6. I�Az""�i�S�'A�'E h�AL"�I'T'E�;��t�E Bl7�YD
�l�d�c�pi�g b�z�d na�.n��he �ity�b�nefi�iary ir�the�n�ua�t�f�l OU,�Qt� shall k�� `
pravided tc��a��ity�r�or to i�su�ac��f�n�r bui��ing pe�tnit;�. S�id br�nd shalt�ur�that
�i�appro�ed lar�d�Gaping enf�a�c�m�ts assc�ciat�eci with the�ar�j"�t are gc�ing to be�rieci
�ut�d�r�p�ly rz��nta�n�. �e bQnd sha1l be r�Ie:�se�i fi�,����ars f�ou�the f�l oc�up�cy
a�+�rt��,��i of the pro��rsed new built3ings�►ith�l�tter frqm the rGity C�r�sultzz�g�k��r�st
confirining khax�II c�f the l�ds�a:pin� f�a�s �r�in�oad sta�d�x�.
'�. ��;T`�.EI� I.��.:'YI)�G�'E 11�.�INTEh�Iw1�E PLA,.""+�
� detaileci Iar��s�aing z�ai��ter��nce���n��subrn��ex�to the�ity£�r re;�i�w and a�gprc►��a1
pnor co is�ar�c�e of�uild�ng��c�nits. �a�ti gI� sk��1l inciu�det�ls +ar�t�e zrri��ai�� s�tem
and the rouxi:��s�h�dute n£r�za.inter��nr..� and t�e ug�-�e� af th�Tar�ds�api�.�ar�e�a�tr�g�ast
sid�c�f Lir�-��e� Lane.
We in the neighborhood would like to have a copy of the plan for items (6) and (7)
quoted above.
8. `�"�H�I'�T�LSL�R:�5���� L�?�A►'I'It3N
T��apglzcant sh�Il war�c with a cansultar�t tc►�v��ate the re��a.�:d re:�ycl�,ng�e�s ofth�
��r�ter and�.�v�Ic�p a p�rtn�n�n.t refus�lre��ing imp�v�x��nt plax� (including but not
Iiiz�i��d t���y�ic��n�v�y up�ste�i versFC�ns �f tr�h cc�mp�c�ors�`�clr,�ure�, aa�y���ary
,gr�s�e fil�ti�n system upgr�d�, any r�ecessar�+�evvag�faci�it�up;�rades �d r�or�efJ�caer�t
r�ffuse gick�up sc;hedul��. Said pl�shaSl���.bmit�ad to th+�Gity fir r�wiew and�approv�
gzior t� �ssuan�e c�f building p�rm��s. A�y�ew trr�sh f�cility sha1l be lca�at�i a�.vay&azn the
�~�szd�teal neig�.b��ka�Qd a�f�ar as pc�ssibl���� .
Has this happened?
Also regarding "Any new trash facility shall be located away from the residentiol
neighborhood as far as possible," this is definitely NOT done as the proposal is to
have a new compactor area close to the residential area.
9. ��'� S�I1TE�
Th�er��e currer�tly two b�s s�vps��ng t��'�lfe�t.��, t�e�f�h.�#�u�stQ�s is �oc�t�n�.r
t,he inters�a�c�i�Home�tead aAd"�4'o�fe� '�,zs b�us stcap will be relc�cated t� the south t�f#h�
�ntr��ririv�i� front o�St�u�s Ct��#'�i�r�rd�r t�gro�ot�e saf�r�ehi��r m�v�m�t.
Tfte �it�plan a�ead�re�ec�s t�iis c�ang�. �Za additzc��,sta�€sugges�t�t�a�g�,�ect be
requir�ci t4 d�e�i,�ar.�d b�i�ci a�r�Fri�t��u� s���sl�e�t�rs at t��two b� st���. The final b�rs
shelt�r d�i�a:r�d ic�c�ci�n shali b�r�vi�v��ci �nd appr�ved�i�the 1'ubIic W�ork� T3ep���t
ta� the�alley�Transpc�rt:atian P�uthi�rity'� �V'T;�1}sp�c'�f"ic��,��.
Has this been done?
1�.E��IC��:'��'�''I'� 'I'[�fiH� INTE�t�Ft CR����i�,�
Th� app�ic.:�rit s�iaTi w�rk with s��'f ta rietermine �reas w°i� the ex�sting sh��p�g c�nnt�r
(�c�r�si�t�n�vvith the r��rnm�daticon� fiam F�hr�nd Pe�rsj t�iat she��Id b�be�ter detar���t�
�s �p�c�� pe�i�strian w�iks �r cr�ssuag ar�, ��eh are�s shal� b� ��az�e�d �ath special
se�a;i-p�v-�ous pavin,g rr��ter�a.ls �rsd stripin�;. D�t�i.l� glar�s ��i�atl b�r��ri�r�•�azrd ap�r�av�c�
by th� �7�si�n R�vie�v C�i:i��pric�r tc� issuanc��fbuiidi.u�pe�its.
Has this happened?
13, �1'�HAI'���14'I�,',"�€'TS T`(�T�E INT�RIQR C�U�t.'7�'��
Th�aFplicant shall wt�rk v!r��.i staf�tc� ��c� a��i activ�te�ie �xi.���trurty��.rds with�he
ft�il�r��m�es:
�.* �i'�w �hadfng�ee�wherever pns�fbie.
+.+ �za�tanc�nm�t�#��+en�hes, sifiting�eas and 1i�i�ng f�atures�
*:� En�anc�ent�t�t�e i�t�rioYr plaza��. ga�eri�g places{i.n�Itadin��ut nr�t limit�d�c�
up�rades t� �p���I se�ni-p�rvia��,���t,�naaterial,tr+eiii�'arb�r fe���x�vater
F�a�ur°� �c;t Q�t�dacrr seatuag a.�a.s�:` ° �
�►��ii�c1�nha�ce��t plan s��ttl b�re�ewed a�r��t�pprov�d by the I�es�gc�R�riev�
�omrr��t�.
Has this happened?
1.�,DES�CT?�1 R�'4T�IE�►�V C+[Jtt'�riITT'��
The besign Review �vm�utt� shall r�vi�ew a�d approve th� fz�a� ar�hit�c€�r�an�i site�lazi
c��`t�e proj��t.
Has the Design Review Committee published its report? If so, where can we find
it?
1�.RA�T+�ARI)El'� . .
The sit� �:ra�nage a�d rex��f' r�raina�e sh.all �be direct�ct tc� the r�n g�rdens arsd�'�r sit�r�lar
ger���u� areas tca t��m�x,±rnu�m �xte�t �o�sible. �i� finat s�it� a.�d raaf d.ra��.�e�l�zx sk�l
��r�vievue+��d �pp�rovex�by th��i,�m Revie�v GQm�rn�t���.
Has this happened? The neighborhood would like to be assured that no rain run-
off goes into the sewer system on Linnet Lane.
I7. �'�RIQ��G S�.T��L`.�'
T�� tc�ttal ��t��r�t pf zncr�as� in th�pr�►pc�se�part�ing �apa.�ity sha�l �qu� or be gceat�r than
t�'�e pr��s��e�c�nt�f inc��ase�z��u�lding squar� f€�c�tag�. Ph�rsic�I me�zes��a.11 irrclude
1�ut n+�� be la�ri�ited t� v��� p�arka;z�g, .t�£�si�� parki:zz� az�cUor c�th�- d�ns� �aes �f p�ark;in,�
measu�r�s (�cludi.n�urbazz li�t;s}tcr �eet�e�pa�czrig�emax�c�. Th�fir� re��ised p�,rt�.gg pla:r�
sha.IJ. be review�ed �nd apgr�v�i by the ��sign Revi�v!v �€�mrr�it�� �rric�r tca �ssuar�Ge af
b�it�in�p�rr�its. IJr��rs l��sl��ll requi�e Pl�ing�t�mrn.is�i�n revi��r �nd agpz�r��aJ..
At issue here is the city council decreed that the center provide at least 855
physical parking spaces not including the ones on the Church grounds. Below is
an excerpt from the cover statement of the 2008 letter.
� T�� �eent�r shall gmvid� � l�ast S5� physi� p�kin,g spac�s �n the �our�d (��t i�cl�din�
the ex�r�sta�ls g�:ned az t1�e c�urch�
Please refer to "Sheet 4" of the new plan. It raises few immediate items:
1) While the parking ratio is maintained at 6.1 between 2008 and 2013
plans, it is still (a) lower than the existing ratio of 6.23 and (b) the total
spaces is less than 855 (842). And even amongst the ones accounted for,
at least 19 spaces are bound to be "practically lost" because of the
delivery trucks. See below for more details.
2) The proposed new plan (Sheet 4) shows the truck route to deliver trailer
supplies to Ranch 99 loading dock. The truck turns right in only on
Homestead and goes between the Church and Building 1 (Ranch 99).
The vehicle goes into the area where the 2"d floor ramp was and backs
up to the loading dock. Please note the dotted lines indicating the truck
turning radius in order to make the turns. In order to make the turns
the delivery vehicle must go over parking spaces in the area. (Total of
19 parking spaces) There are two issues here.
a. The 19 parking spaces should not count as part of the parking
since the spaces are needed for the delivery vehicle to make
delivery to the loading dock.
b. Delivery according to Cupertino Municipal Code is between the
hours of 8 AM and 8 PM only. So the delivery vehicles need this
space to make the deliveries. It is against the Cupertino
Municipal Code to make deliveries between the hours of 8:01 PM
and 7:59 AM. This would mean no deliveries after hours (early
am) -- which was violated repeatedly by Ranch 99 in the past, and
has been bought to the attention of the City of Cupertino by our
neighborhood.
I�. S�C��I'►t'4�ALL
� min�.muu�n ei;�h.t (8� f�t t�.il w�l sha�l be construct�d a1c�n� �e n�rtherl� p��perty line
�tv���ez� the ���pgiz�� cent�r au�d th� chur�h prc�g�rt�r, Ir� addition, � 1c�c�C� g�t� s�l �i�
p��deci a� ��nutually (b�t�veer� t�e shc�aping�enter ar�d c�i�h)��re�d ��c�tica�. T`�c�al
w�il and �ate plan s�a�1 b�revi�ed a�d spproved by�e��sign F���°i�erov �errn�ttee,
Has the Design Review Committee reviewed and approved the final wall and gate
plan?
I9.Hi3ME�TE�DRI�WAY
T�� cisiv�a}� a�c�ng H�ar�est�ad R��d sha,ll be Iimi�eti to n�t-in and ri�tt-out s�nly.
1��prr�pria�� �i�ag� and �riv��,���r mo�i�ca#�on t� i�pl�nez�t r,��� �ig}�t-in ��i ri�iAcsut
m���m�nt shal:l be r���i�� an:d ��,ra�Fed ti�Direc�c�r of F�ib�ac'�+�c�z�s gri�r t� i�s�c��f
�ui�ding p�nit�.
We noticed discrepancy here. Please refer to Sheet 4 of the new plan. It now
allows "Left Out" on the Homestead Road and this is not in the original plan.
��. N1����t�R�IC}t)D� SIG�T�"�CC)G�
,A si�a p��ogram shal.l be pr�vzded�o address ap�r+�p�ate ne�g,�bt�r�a�d sigas t+a inforFn and
d�t�r th�publi�fr�m p�.rking in the resid�ntial stree�s. Sa�d�rag�� �I�aII�e r��ri�w�� �
ap�r+�veci by the+�i�°c�f Sunny��.l�.
Has the City of Sunnyvale reviewed and approved sign program?
2�, �T��'��� �t�C.�..�'�`O�DET.�
I3�t�ils shc�ul�i b�pr���ided oz���w�tuc� w�.il tap is fzx�ishec�t��f'��vc�i�she�r��t�ll c�p
fl�hii�g}. .
Has this been provided?
2�.11�iULTI-LAI�TGt�Ai�� ����5
Require cl��ar multz-l�n��e si��z�ach r�f the pe��tri��trar�ce��ll�n�Liunet L,�.�,
iraferrm°ing t�iee�nn not tc�paz'k i�t.�i�re�iden�i�l str+�ts. Alsc�, t.��i�stallatic�n of a multi-
Ian�uag�e sig�to in.iFc�rtn ��k� c�f th�d�ii�e�h�rt�a�ad�le� sh�11 b�pr��id�d. �tai��
�i�n�ge Flans sha�I�e�t�bmitt�i� th��ity fc►r re��ew �nnd appr��r�.pr'rt�r ta �ssuanc�c�f
buiit�ing g�rrm:its.
Has this happened?
27,DIS+�L(�S�tE €?F�t��I�"IC3IV'� T{.?T��AN'�'�
I�e�uir� i��t�e�con��tic�rr�s af a�prav�,t (inctudin�th�c�ity's n���c�rdi�anc��be m�ci��
�of th��e�se a,gr��m�t�of all r�ew t�ants s� t��y�riil b��infc►��xi of the c��ditir�ns and
�-�.Ie� rhat wi��b�et�f+ar�d.
Has this been done?
��. S�C:'[.T�.�fi'Y�C'�RA�
R�quir���ty eazner�as tc�be ins�tali�a�&ey tl�ti��y�tn assist irY monit+�rin�and
�nf�rcin�d��iv�r�,r k�o�rs�d nais�vi�olatars. .A,d�tail�i s�i�+r�um�a plaa s��.Il�a�
submitte�dl�"t��r re�iew� and�ppro��grivc t� i�su�ce ofb�ildin�p�ermit�.
In the wake of our past experience with the delivery trucks to Ranch 99 market,
we request an Internet Protocol security camera to be installed by the loading
dock so the sheriff department and public can monitor the delivery hours to the
building 1 loading dock (Ranch 99), at a minimum. It is very easy to do with
today's technology.
2�. ����T�IT�' �ER,ir iC�S
R�quir���r,.�nter te� enhane�ps�na�s�i�s� that they ca�a m�nii�ar and prev�nt spill awer
garkin�into the ne�g���rh�saci and�he d��i����ctiviti�s. '�s�e��ter�hc�uld a��c�pr�ovid�a
ht�t1����t�e adja�t resi�en�t�a r�port an�r�d�win�at��c���u���e activ�ties, Sa�d
pa�rtil serrice sh�l1 �lsa mcrn.itor th��r�h f��iiiti�,s t���ure a1�i��ts ar�usi.�g the
facilifies pr�operl�. � det�il��i �ecc�ri�y pl�sh�I b� su�imitte.��ca�'h�Cit�f�z�re��iew and
��r�v� p��ar t� issu�c��a���ilding p�rnits.
We would like to have the phone number, preferably prior to the commencement
of the project. Also, has the plan been submitted and approved?
��• .7���J i11�11is L� 1���,�il���al�l tf.&��i..�
'i°�e requireci sec�uity and maint�nanc�s++errvic�s�iall apply ta the sho�pi�g c�nter gr��ert��
w�Ii a�alaz�g tl�te�act�ri�ar p�i�n�t�of the Lin��t Lan� ��.rage wali a�ad lanciscap�a���a. A
det,ail�d sec:�n'r���i maint�a�.rac,�gl�sha�,l b�pr€avid�d tc� �h� Cit��'vr revi�ew and a�rvv�l
pric�r tc�i�su�rtce of b�tilt�g per�nats.
This is very important for us. Has the plan been submitted and reviewed and
approved by the City? We would like to have a copy of the plan.
33. +�AI�G� +���'�TS'�`�.i�CTI(3t''�
Th�gar�g��ha�I b�e built�`ir�t st�that the aciditz�n�l pa�t��ng�talls �ava��bl��uuri�.��a�
�ristructi��periv�a�f the t+�o r���il bc�ild�gs.
We in the neighborhood want to reiterate that this be followed strictly so as to
prevent parking spillover to the residential areas on Linnet Lane.
�4� ��IE�,'l��.�t� �IDE��I�I�IP�t€)�E��iT P��;'�d
'T�ie f�na] media� and src��walk impra���t p��n, i�cludi�g�ut nflt limite�3 ta th���ie�tez'�d
Ie#�t�trn frc�m V4'olfe Rc��i�d t�e�r�w sid�alk re��st�uctiv�a�a�g'WQIf�and Homest�a.d
Rt�ad�, s��I�i�s�ibrnitted t€� th��it�r�`��re4�ew az�d approval�ric�r tQ commer��rnent of t�e
�n�t�ti�n�f th�imprt�v�n�nt�. �aid piar�sh�Il be prepased by a�r�f�ssiar��i civil
�n�iz��er and v�r��tld r�qaur�t��er re���i�w�f�a�prtrj�ct tra#�c�gi�a�er.
Has the plan been submitted to the City? Has it been approved?
36. A�.B���ST ���Y
�`h� �n�l ���sc�gi�g pl�s�all be r�vi�wed h�the C;i�jr,�,rbvrist�ric�r to i�su�c��f
buildin�perck��t�. '�e City,r'L�°baonst s��ll al�o t��rify t�tat th�Iandsr�pimg h�been+�ed
�u�i� �c�rd�nce�� �be�pmv�si lands�apin�plan a�d that a�I c�f�c l�nds�apin� �ea�r�s
a��i� ��r�d. standi.��p��r tc� tYie �nal r�elease�f�a�cupane��t�r th�t��o �m��rcial
l�uz�e�az�g�.
Has this been done?
3?.D�P�'I"1'��+�" C,���T(�XIC �IT�i'�"�T��S C�1 �'TRt�L
'�e�r���vvn�r is�uir�d ta satisfy�,+��the r�qt��m�t�gr�crib�i b}�tl�e
I3e�ai-t�i�t ofT�xac Su�stanc�es��t�c�l in r��ar�� t�a��e cfean ug the f�a�er Cup�tino
V�l�ag��lear��er°s �te.
Has a certification from DTSC been issued? Can we have a copy of that?
3�.T�'�� S�G?11�, l�'��tJT����A`t��]►�t
�I'�`l� �f��ICSt1�S�.I �CI��1��G 51�E'lr'lI III.£�i�i1�Y�,��1C?���32`�34��aq�t� at fih�
Hom�ste�t�t�If'�zz���rse�c�i�an in�.n amoun�ncat�c� ex+�eeci��StE}U(�, sa.i�amount s�ali be
du�as a�ep��it�r r�b�s�eryt pri�r tv f�ta1 ca�c�g�an��f th� �up�in:� �Jilla��
develc►pme��ir�prc����nts. It:is the�i�'s intez�tivn tha�th�tr�"ic sigrral impm�emerYts
b�c�nstructe€i ag soan as fe�'ibPe az�d�o l�t�r th�fi�re��ss a&�rn���rcrje�t a}x�rc�val.
HAS THIS HAPPENED? Project was approved April 17, 2007 it is now past the 5
year date.
39. FIl'�A� F��+I+� PZ�.�� A�PP�t�}��
Ft��s�exi pazking pl�i s�.11�e r�vi�w�i arid�pr���d b���Plannin��d�it�D�ga�tments
priar tt� issu�nnce c�f bt�ildi����rrmits.
Has this been done?
41�. �t7�4, �S7CE,A►,�1�t�AU I?RI�'W�iY
T�ie Hc�m�s�e�� l�ac�I3rive��ay sh�I ta�e€iesag��ted a� ri�ht�a:rn in„ri,�bi tum and s��1t�r�
l�f��ut�n1�. '��fi��l drt;v��ay a�c3 m�an a�a�r�a���t y�1�sb�a,�1 be submitt�d t��he
�itv fr�r rcvie�aa�.rl apprr�val prior i4 ���uan���fbt�iIding g�m.its.
Conflicts with 19 of the Use Permit above (it does not allow "sheltered left out").
Note that "left out" would put the vehicle into the path of the incoming delivery
vehicle route.
�d• ��.,f:l;��.i.�.�° � ,••.. r :�,. .
Dr�ina�e sh�il be�rc�vi�ed t�tl�.e�atisfa�tion c�f�ie Cit�En�eer.
�` Fr� and�'�st-clevelcrpr�cnt��lcc��ation� �u��b�pra��id�d to�c�ez�t�y i�`star� drsin
facilities �ne�c�t,a be �an�trrtcted or re�c�vat�d..
Has this been done?
�S. �J`+�`D��3.�G�`t+�►L��TTIL�TIE�
Tl�ie d�v��l+�p�° sha�I cc�mp�y with the r�quir�ments +�f rh� �.�nder�rt�un� �Ttiiit�� C}rdinane�
�3c�. 331 8iit� Ot�i��' F�I3t� '�ZdiLt.az]C�5 �[i� r��ti��ffi(A3� t�� '��i� �lt�+ ���7�'CiIICf, �d shall
c�rdinate with �ffe�cte�d ui��ity grc���de:s fc�� inst�lll�oa� c�f rsnderg�und utilicy d�ic�s.
C?rdi�a�ce l�rv. �31 r uire� a�� Q�'er�iead Iines tca b� under �uuc� ��hether th� Ii�.es ar� zae��v
�� exz�in�. '�'he develo�e� sha:ll submi� detail� plans shc�wi�ng �tility undergr�und
�a�°ovi�i�ns. Said p��s�.s st�ail b����ij�ct to pr��r app�a��vat t�f the a�e�ted t�ti�ity pravi�i�r,�zad
t�te �ii�v En�eer.
Has this been approved?
112, T1��.F�'IC�'TL�'�F����lT�,l'�T� CU"I`-�4i�GH TR,A.�+G
'��app���c�,t�h�l �c� a stud�r to e�anune gtatezYtaa�cut thrau�h tr�Ffic��sultin�fr�m the
prapos�des=elc�p�er�t alc����otfe Rc�a�i�etv��Pc�erid��.Av�rtu��nd�Ia��st��d
�oad. 'T'3�e ap�licazi�sh�il���f�r nec�sarryy trat��im�rovern�nts t+��c�r+�ss k�is pQt�taa�
�affic izr�pa.�t. '�4ir�rk shal�b�ccac�rtii��t� �,�it�th�Pu�$���'�rks��epaxtment.
Has this happened, what is the result?
Comments/concerns re�ardin�the Architectural & Site Approval Submittal
dated luly 10, 2013.
Comparing ASA-2007-10 approved plans to Submittal ASA-2013-05, KIMCO July
10, 2013 Architectural & Site Approval Submittal , the following are our
comments/concerns regarding the Architectural & Site Approval Submittal dated
July 10, 2013.
1. We want to be assured that there are NO openings on to Linnet Lane (car
or pedestrian), except for the fire truck access. Also, the currently open
pedestrian opening from Parnell Place into the Cupertino Village will be
closed. Includes the Church and Shopping Center property except for the
locked gate.
The rest of the document contains our comments and the discrepancies we
noticed between this plan and the approved plan from ASA-2007-10.
1. Parking Stalls—the numbers are not adding up and present a discrepancy
from the old and new plans.
A detailed count was performed on the proposed drawing 5 and the
number of parking stalls differ. Also it seems that the center is counting
the parking spaces in the area in which delivery vehicles must use to back
trailer to Building 1 loading dock. Discussed in more detail below.
Drawin� 3
Accordin� to Pa�e 3 of new plan
��t��ca��r� ���Ti�+�
��9,t35��F BUCL.C}Ih�G AR�A 114,�22�F B�11L�iNG AREA
85fa PARK��tG�T�LLS(�.2��f14+�) 71�4 F�A�KJNG STA,Ll.S�6���'1��f3}
21 H�AND 8�3�F��C3,
�6.�6�SF P��ti�ING C}E�K
Accordin� to "Sheet 3A" of the original plan (2007)
����o��� ���s�`t��
���.�s��� ��t���s��� ���,���s���.�����,
��5 i�.��K���a ai���..��� �,=��v� ��t ����fr�t��i��Li..� �� �.`���,
�1 F-���i��?��� ��C�.
.�a,���S� �':�,�?�l��'a C3��K
Existing numbers do not match up 112,607 vs 114,622, nor to the proposed
numbers. Also the and the parking spaces do not match up 691 vs 714.
Which is correct? And what is 21 HC parking spaces?
Drawin�4
item 1: Entitled and Proposed Parking Stalls
Following is a snapshot from page 4.
�tF�� �r�tx� ��s��
�It1�Ol�� 7��tlf�i3
�llIE�DI#�L�l�AFAEk�sa,f#.1
�,IS�FNG�111�..UFt� 11�4,£� �14.�Z2' 11�.E���
�15�N��lJl�tt�h��F�1R i�Eh4C1 {=.RSG'.i
�rn��� ��,��� i�,��a
�`r��� �,��� s��7s
T�RAL C�AQ5S LEJt�IAB�LE A�A 114,822 13�� 13b,�95
!',ttRlSlN�i5��1x1�� 36.56� 34,r25
TQT�4L AF�A Z�J,244 1'75s6"�6 t 71,42t1
f?,"�I��
�N�-��E }�4 f��3 +�10
51RtJ��l�b Z�3 Z3�
'F1��1LRJ� ?t4 856 84Z
�'�'tK��f?{t'�If}` 6.23 E�.16 �.3�
'f�as,�i a�y�e�s l��hl��ea
The Entitled numbers are the approved project numbers, which match at 139,052
sf with 856 parking spaces.
PARKING STRUCTURE ON THE 2 FLOOR HAS CHANGED THE SIZE HAS BEEN
REDUCED AND THE RAMP REMOVED toward the church, losing 11 parking
spaces. Note that the structure has also changed and may affect sound from the
2 floor. This is of major concern for the immediate neighbors living on Linnet
Lane.
The approved plans had 814 Reg and 21 HC parking stalls for a total of 835
according to sheet 3A of the approved plans. The proposed plan shows 842 i.e.
LESS than minimum required parking spaces.
NOTE per April 17, 2008 letter the City Council approved the project with the
following item.
� �e �nter shal:l pr��ride at l�t 855 physica� par�i�tg sp��e� an tk�,e �c�un� (��t in�cluding
t.�e extra stall��a��n�sd at th�church}
So, this is NOT per the City Council decree.
A detailed count of the number of parking spaces was done on drawing 5 and the
total number of parking spaces counted was 815 regular parking and 19 Handy
Cap parking. This differs from all of the different drawing count. Count attached.
This number includes 18 parking spaces shown in the delivery truck turn in area in
which the truck is shown in drawing 5 to go into the parking stalls in order to back
the trailer to Building 1 loading doc. The number should not count and if this is
taken into account the parking number would be 796 regular parking spaces with
19 Handy Cap spaces.
Parking was a major issue when this project was passed by the City Council. The
vote was 3 to 2 and several council members were very concerned about the
parking situation. The proposal has reduced the parking structure size and the
number of parking spaces from the approved proposal and does not meet the
council's requirement of at least 855 parking spaces.
The city council also wrote in the Use Permit letter. "Council reserves the right to
require applicant/property owner to provide valet parking if needed." Since
parking numbers are being reduced the city should require valet parking.
ltem 2: Truck Access Path from Homestead Road
Plan Shows Truck access in with a Right out, Right in Left out on Homestead Road.
This is in violation of the USE permit item 19 — reproduced below.
1�. HOIMES'TE�?IJ►RI�W,,�Y
The ciriueway a.tc�ng Hon��te�d Roac� sha�Tl be Iimit�ti tn ri.g�t-in and ri�.t-out only.
Apgropriaxe si�aage and drive��ay rncodifi�acion ta impl��t the �g�t-in az�d rr,�kat-out
rnov�nent shall be revie��i and ag�xr�aved by�ir�ctnr c�f Pt�blic"L'+�a�s pricar to issua�.�ce of
buildirt�p�rrni�s.
Item 3: Traffic Turn Control
Who controls the traffic turn rules for the traffic on Homestead Road — Cupertino
or Sunnyvale? Does Sunnyvale Traffic Department need to make the change? This
will affect the flow of traffic on Homestead that impact the Apple 2 EIR and make
it worse for people trying to get to their homes on Linnet Lane. Will Cupertino
traffic department make sure the traffic signals are programmed so the residents
can leave on Heron Ave. Cupertino now has control over that particular traffic
signal, as confirmed by Sunnyvale City Council when specifically asked this
question by one of the residents of the neighborhood. Cupertino City Council has
passed or in the process of passing 3 large projects that affect traffic on
Homestead Road (Apple 2 Campus, Cupertino Village Shopping Center and
Homestead Square Shopping Center).
Item 4: Proposed Truck Route for Delivery to Ranch 99
The proposed plan shows the truck route to deliver trailer supplies to Ranch 99
loading dock. The truck turns right in only on Homestead and goes between the
Church and Building 1 (Ranch 99). The vehicle goes into the area where the 2nd
floor ramp was and backs up to the loading dock. Please note the dotted lines
indicating the truck turning radius in order to make the turns. In order to make
the turns the delivery vehicle must go over parking spaces in the area. (Total of
19 parking spaces)
There are three issues here.
a) The 19 parking spaces should not count as part of the parking since the
spaces are needed for the delivery vehicle to make delivery to the loading dock,
and
b) Delivery according to Cupertino Municipal Code is between the hours of
8 AM and 8 PM only. So the delivery vehicles need this space to make the
deliveries. It is against the Cupertino Municipal Code to make deliveries between
the hours of 8:01 PM and 7:59 AM. This would mean no deliveries after hours
(early am) which, based on our past experience, is what Ranch 99 has repeatedly
violated' in the past repeatedly.
c) The proposed truck route is very narrow and barely wide enough for the
truck and trailer let a{one another incoming car on a two way lane. There is not
enough space for the delivery vehicle and car to go through the lane between the
church and Building 1. Another reason not to count the 13 parking spaces in the
demolished dry cleaner site. The truck route simulation on the drawing show that
cubs, walls and possible cars sticking out of parking stalls may make contact with
the delivery vehicle.
New compactor -Church Lot—clean-up site
_.:�� � �i.�hiNETt.Ari� '�'�_-�_ ,?c� ���xe�a— , _� �� `�,____�m _ �, �'
r-_ .. �� �� �
_ --_- __. �
�e—�.._._,. . .__._---° —•—�.—"A
'' �_ "_"---�—�—...,
' __, . � ... .--E . - „ o
.. ....�.�..,.��..�...�� .a ._...__ � 3 i ��
� . � � � .� � . � ;� � � . . � � � ...
__"`. �� ^ '�
� ,'�n ..,a'a'.,.� , �! ,
i D2i35PAC=.S O tElrL 2 �E '—' '." k / , _
� ` , �� �.. : ,� ; ��. : . < ' ;. � .. ��
� r-
�
r��,_..��.... �� — �'�,'�,,_ �' j �� t� j
� ,� w�c�axo�
�� ,�`� v � „ � ;�- � `� �c �
� ,.
�
�m
,"�. � �
�
,� t��� `�;% ,�`�'``�,�� ; _ ,.~
F�� � y , ,. , � - � �-: �
, , �,, ���a �
�'�- � ,,� __....
; �, � i�, �
�� �;���''� yn����� � �. � � � ��� .
� � - n�
, �. �;, z �� ;, ,, ' , �
� ��� � ,
`����', .�:a itd�BJ:s�lNG 4 �i���, , � �� � i
` �
� '� 23.�Od vF �� � ,_ � _ �_ }
� �;, � �
?„''*` ���E=172 1 ''* �� , ° ,,,,"'^*��
� iFc�?PAi.'A^iU'IJ,Mta'B5:^'.i�? ',_ �'. . �` '— ""' ----°° _. <--i�/'
� � � �� � � �1
,� W��
� JCti,.�it�G AJ LtiN('i 7 '' � � � I
� 31 279'"s� � ��- � ,.,, _ti � ;
t"�',(i FE=S7t7.4 >`' L �"
p y�� t� �yp r�� 3'._..,Yn � ,: J' 4::
�R A�4KJ��'A1LF��fML 1J.PJ.t:/JO� �� '� c. _ �-..-...
^w
i p� ��y }�� .�
' � j
��:�f 1�{��,�:,Y�/���41.+,���.5� . .. -.._f�� . ' � .
.{�-�+iJr`�'M1��-//} . . /� �"� ' } — j �
i./�,a���t�=ry'�y�i,"�.FC��L�ryry' � ,s� . ti
7GV:SR�♦�I..�T'V'�J.W-GVJVj .. _ . �':E� 4 �'_ ,r Y i _ � . .
� f•E � ,,�� --�� . 1 N '.. . .
/-�v_ � �Z•, ��;'t�''-- ,H--S � ��; �.. -
r , �', "� � �
r
f �, �
E.x,S , -_ _ � �; _
NG��3 eQJ'��2 ,
_
, 3
._ ,. . Y 4 .._ �a'
a _ x }
�. . G�_�3J�' ' ' � J�•— 'a < _,,,+� �
_ a ,
�—.< � T
�. L � , ,
o-<�.�� r-.. . . .. z»'( �. .. ' , � .....
.:.. .... ... .... ......... .. .... . � , ...... —.::::�. '-, . ✓3 . ...� .,,..'. ..""6 3 .
� �� __.�.W_.. �� } �� � � °� ,��.,�a�,� �
� � � � � �'
� � � � FF � � �
4 � . � � � � � ( � ���� � �� � .
.... . � � . .. . gnBL.:
�
�
�� � .. .. ., � .. ✓. .
I �/`
� � � � � _r����� '�/
� �{ '
� � � a � � � � ��
� �
,�,�...� ` � � -__ �"`� ,
� � �� �
� � t � � � �
� ____ �
��� � �
� � � � _-:���� � :� t'° �_.._:_._� ��� .____.,.:�'`
�� � - . � ,,�
'',r �
�
4 �f � �
/
�-
� .. �� � � � �� ,... � � .
/'
f
,q,�. °''+.. . f , .. .
� � � f
��� � � -`� �
w
, ,. �. �,� �
� `*�,� '� �� � � �` �
�
� .
. `
. � x> �> �`' < .
Detail of the Delivery Truck turn-in area for backing into 99 Ranch loading dock
From sheet 4 of proposal submittal
Item 5: Demolition of Cupertino Dry Cleaner Site for creating more parking
spaces.
Proposed plan shows that part of Building 1 will be demolished and 13 parking
spaces added. This is the Cupertino Dry Cleaner site. See picture above showing
the clean-up site area. The area is in the process of being cleaned up by DTSC
(Department of Toxic Substance Control). According to ENVIROSTOR in a
1/28/2011 Remedial Investigation Report said " Site Assessment Report indicates
that PCE vapor plume at the Site presents an elevated risk to human health and
safety and the environment at the Site and PCE is migrating offsite. Further action
will be required to remediate the contamination." Work is still being done at the
present time. The site also has a revised date of 2/14/2014 for " Removal Action
Completion Report". Public notice will have to be given and Certification issued
so the site can be used. DTSC has to issue a Certification before the clean-up site
can be demolished and turned into parking spaces.
This is also part of the Use Permit item 37, reproduced here.
37.1��F��'I���E�'�T t�S�'TC)�C SUa�T�1��S ��I�"�RC��,
Tl��p�pexty�a�er i�r�uir�ti tc� s�tisfy���.c��ttie r�c��i.r�m�►ts prescr�b�d by the
I7e�artment af�I'+axic �ubst�ces C;ont�al in regards to th�cI�up t�e fc�rcner�up�rtino
'�ill��� Cl��n��''s site.
Note— Certification must be given by the DTSC before the area can be demolished
or worked on.
Item 6: Proposed Plan drawing shows a new Compactor area next to the loading
dock at Building 1. Is the old compactor to be removed? ft is located close by.
See Picture above showing the compactor.
This is AGAINST the USE Permit item 8 which states "Any new trash facility shall
be located away from the residential neighborhood as far as possible."
Item 7: Parking was a major issue as the Cupertino city council made an issue at
the approval meeting.
Parking is still an issue. The letter from City of Cupertino Office of the City Clerk
dated 4/17/2008 stated that "The center shall provide at least 855 physical
parking spaces on the ground (not including the extra stalls gained at the church)"
Item 39 of the Use Permit states "Revised parking plan shall be reviewed and
approved by the Planning and Fire Departments prior to issuance of building
permits. Did the Fire Department given approval on the plans?
A detail parking plan must be done since the issues above with the vehicle
delivery using parking spaces to make their turning radius to back into the loading
dock of Building 1.
There are other areas where parking spaces were deleted and added. A detail
accounting of physical parking spaces should be done to satisfy the USE Permit.
Most of the numbers on the drawings are based on just the square footage
percentage.
Drawin� 5
When compared with the approved plan's "Drawing 3A"
1) Parking removed in front of Retail A proposed building.
2) Parking removed by the Building 7 (pub) —this is done to create the driveway.
Issue about reduction of parking. See item 7 of Drawing 3 for comments.
Drawin� 6
1) Locked Gate of Church Access Only - Did the church approve the location of
the gate?
2) Looks like most of the trees requirement has been moved to the exterior edges
of the project.
Question and Concern — Who is responsible for the tree maintenance, in
particular on the boarder of Linnet Lane? Cupertino City or Shopping Center?
Concern is that the trees will grow and block the sheet lights from illuminating
Linnet Lane.
Drawin� 16
Bottom - East Elevation at Parking Proposed
Drawing of the front view of parking structure show on the extreme right, a blank
area where the delivery vehicle (truck and trailer) will use to back into the loading
dock area of building 1 (Ranch 99).
NOTE no parking spaces are shown so the 19 parking spaces in drawing 4 and 5
should be removed and the count of parking spaces should be reduced. See
comment on drawing 4 and 5.
Drawin�s 18, 24 and 27
These two show the parking structure from Linnet Lane. There is a change on the
second floor of the parking structure from the original. Comparing Drawing 27 of
the proposed submittal and Sheet 8 of the original (from 2008) shows the roof
screen design has changed significantly. The sound is not being reflected back to
the shopping center by the roof screen. Instead there is just a 6 foot straight wall.
Two issues here.
1) the wall is not tall enough. Someone can still look over the wall into the
neighborhood.
2) since the noise properties are changed more noise will go into the
neighborhood. Please note that at the present time at night we enjoy a quiet 40-
45 db A slow sound reading and would like to maintain that. Also final garage
plan should be reviewed by noise consultant to make sure the 40-45 db A slow
noise level is maintained at night.
� � �� � ,��`"`-��'��.�� "��;'� �� � � �� � �� � � � �:�
� �.,°� F 3�., �
L a,�: . . . . . .
`�.�t {1�...p �,, ��u^ ` o . . �'
� �� .,�� J�9�F f� . . . . . . .
S 50- s . � . . . .
^d ,"� i zn � ���4-E��, . . . � � . � � .
� ��, ���
� •*� �� °� � � <.t�
; ° � � �
. ' �,-" d<
-'�-;`�� —a�� �.-,-�-,-" ^'r� � � � � g:
� c� � � �� '
a �
�' �
� u <
�a�
�
E� �� ��
�", �� � � ,
E�� ':�s � i : Ct°, . ' ...' �. '. . �
F � ��
y, ��,�' . . . �. .. . �� . .. �
, = ,v. ' ' �.. - -�,, . .
.. , , -. .�. ��, . _ .
�
.. > , , .,� � E .� .� F �
S�t�� . r . . . ..
s` � �. . . . � . �
"�t°� ' .,{ . � � ... . . . . .
,
y
,, ,
,- , �
, ,�
E , � :�
�_ . _ _
„ � , _ ...___._ ,
i, i � � . .. . �-x
,� .� � � . . � . .��.
� . : � �
. . . � . . � . �. �. <1: . � � �� �
. . , , . � , . �� � .. . .
. . � .� . . .. �, . .. . „ P . . � .. .
g�' � ._..:�a� ..
u�'������ �� �s�
a �Y �qr
�c��t�,���a�� 'a � � . .
'�2�', "o�� �' , . . � } �`ass `�' "�` ,
'� � `z: ,s ?�P' �-"f�� . � . `
��� � 3- �', y � � a a 3 i ��s E+ � �` �& ��. �.
.i� �. � ,�r�� ���� s��°s � ����.��' �;� ��,,.�����:s�a.���s����;a.�=��.�`��i.���s�.�..�;��.�'�'�"„`1,�. �
'�� �k�s ._. �' k�mM .� '�3=_ x.�&<-.t->r-�:� �„�
. � x>
_o���� :: € � ,.. '
�
;:�.. .._ ....... ._.: ._..... . . ...., ...�:... .... .... .. ... _.... ..... ....... .._.. ._.�_. . __�..�_ . .;�,.,. ,,s,�;�e
From Drawing 27 of the proposed top 2"d story parking structure facing Linnet
Notice the top over hang— different from the following
r
�"
. ..x. . � . � . . .
t ^e J IJ �
g
r��' �1,�� '� �
'�,., �
�° �' 4 1��� � �.
e-�t y.
9 } �Y�i�
k"".a`'~�,,.�.= �* , :�.�, �
.r a
;_�
� ,� r` '�^:
,.,��•�., --""��F�,t5114�d . ... . �
�f �..' �� . _,_._
�*�, % , "'
.��++�' ..`� g^���`. qa� �`A„`S- � .
1a�� °��' ...,...lJ....�� F . ..i',�j�",�!�"Et='.+t i ��[LL�➢�i�;o . �.
`��� A'p� �� °�'f � r .
}dEu3i'T 1.Jk#�t,?r �f +� . . �s=- � ,�.> �.
s.
ya� X...> z' g ..
� � i
�yt�.^a ,�._'�`�.-�...._.,.,...�:..�.
>, a
s
�i�
i r`�SrP
� ^�a��,fa,�°�r` �
�s�
� g�
� � ��RB;:R#�tp^�� `
ea
From Approved drawing sheet 8
Note the roof screen has been removed. At a previous planning and city council
meeting the roof screen was said to help reflect noise back toward the center and
away from the Linnet Lane Neighborhood. The new design will not do this. New
noise study must be done to ensure that the neighborhood will have their quiet
45 dB A slow level at night when the cars leave the garage.
�._ _.�p�
�, �.�,�
-:�.--.- ��`���:��
� � .;� -�,-__ � �
y��� .��---- �/ ��..-� � ,
.. .�+`+`P211:..XS.p�",w=,�'E'pN �F "Y ` . . . �. . . . .'i,� � g .� ,- '-.,
�Y �y � ^
. .. .. .. ��^� � . . . . . . �. � � �
. . . ��� p . . ... . � � ^i
. .. . . . . . . . . . . ... F �
d
. � � _.,--`" . . } � .
. . . s_ ' . ' . � � '. �
. �. . �_� �r . . . .�1{ .
� ' .-f. �}7 ,.
� �,�i�`- '.S: � .,
. �s � .-. .�. _�:... � �._ _e,.�.
.. .. . � ��� . . . . .. . . "'rw��
. � .___,_ . ������w�'ii.-��at..�''�I`�i��� F i. ..._.� ;y s^;��
. , -�.,�"r3�i.1.. pG+�f -CIi�'.'
. . ,�x ... , . . ..
. ^R�^'`"�'M ��3 t �.^++�}l+.E'P¢„t�t-,�'. �";.. �'"�+�F:44,'�S
. . .}. Nt�g s'1f.MtdB �� ^---.a-�..��..�ib`.y....,�..,..�,,......�- .
. . . . � g,r.:.�,�y � . . . .
. e �4 .a..,�„—.�..,;...,�„ . .
��
. � �. � � . � � �. .x`t= *at .M r't�a
°+9"cn
. � , . . ��: _ � . � . � °�t�.E�_i�rJ��;x�x
. > � ,y; . .r"'f?z:�.,.+.:.ib°9t',
. . . N�,:�r4.=. .,._..�,dF.,�.x.. . � � P#:�^.',s.tw'"cx�,aati .
. �-�.-'l-�.t'.: � -� � �
. �. �;. . .. . � � .
.-� � . �....� .
. '1 �,• .. . � � .+�.�- � 7. °5_° —��-� y� � .
—�t -.*
... � � "� _� � . . � . . E 1 3 "kr m t�,�- W
� � .. � . . , �..,��.3„x, .� �...� ��
. . . . . . . . .. �ti i�^".»=^
�� � � ' � � � � ;i
� �� �� � � i �
q ;��, � � � � �A
�
b' • �e}e ,
� �.�, � .+' I � r ..,.�,.� .� . ? _
, ,�_ � s
._,,. _. ;
e__
�r o.��., �«..__� „ r�� __- i _ .__ �
^'.."^�^'..� . , �.�- _� ___�. —
�. , , _:�
_ m. � _ �^ ' �
' .,,-`-..�.
� . � � --r���°�� ra�,���.��.��r�
. . ° � , . '�r�.,.*"�'Ek£'...:.E3�X.��.«
. . � . � Pik!��t+ti' '_fi':t?�?T'<«..:�'SS
� � . . °!ti�;��a.e���3���+ . . . .
. .. . . . . � .. � .� . ;i`����(�.`�Gi.R_�I�HW.ti�nYT�,atle�k'.;�. � .�.. .
, . . .�. � ,.� � p�
,�,.:,,. ,,: ._,_ ,i,., ..,�.v .. ....>r i.. �.,e. :.;, �;_ ,, < , . �e, ,.. , a _ .,..._ . ....m, ...._ __•.. ....,,�.,�. „ i__,,,W..ve
_ _ ..`"".�+I�r.
From Approved drawing from sheet 13 showing details of the roof screen.
Drawing 27 shows the landscaping sloped to the street with no catchment so the
run off does not go into the street drainage. This is different from sheet 8
drawing of the approved plans. Approved sheet L4 has more detail of the street
Scape.
Drawin� 29
Item 7 shows the top of the 2 floor garage facing Linnet which is different from
the approved drawing sheet 13 wall section.
Drawin� 4,5 , 16, 17, 25
Drawing 4, 5, 16, Need more detail of the removed ramp area. Is this area
enclosed so that no one has access from Linnet Lane? This is what the City
Council agreed to, that there would be no access from Linnet Lane including the
Church parking lot to the shopping center except for a locked gate.
Drawing 16 shows the area to be open? Is this correct. Also no cars are shown
there so the parking stalls should be removed from the count as this is the area
that delivery vehicles with trailers are using in order to back their trailers to the
loading dock of Building 1.
Drawing 17 shows a North Elevation (top picture) at the Parking structure with a
opening to the parking garage. Is this correct? There is no access to the parking
Garage from Linnet. A wall is supposed to boarder completely Linnet and the
church parking lot and day care area except for the locked gate.
Drawing 25 Parking Structure view from Linnet Lane looking North —The drawing
shows a street entrance to the parking structure from Linnet Lane. There should
be no street entrance to the parking garage from Linnet or even a street entrance
to the shopping center except for a locked fire entrance.
r .aa�.: w��,.-: .... ' , z �i a`.CFF..S ._;� ,. �. <: .; :, �: ,�£,.`F., ,x1 g,a+.�aB�L". d F
��:.t�3"9I��`&'.�:^1���.F�'w.�."��6.�i?��i i t�K4��'��+I'Yi� � � .
��
�
. . . � . �i� . &':.�✓`�S, ;��.
. . . . . ��� � •
.. . . �� � .. ... �� •�„ ..
e:�,�,¢w<'.2 2e� � � . . . . ��, .
� ..{.:'�,`v �'
. . � . .. . , . , �an � ..
. ... . .. � 1`^�� �t�^
,�,� f
. . . . . �G,�.s Ay�.
� . �� .. , �:. .,y..u...'3 � � � �`'�� .
� , ����� �
�
� ��_ �� r�
'� �
�� �
,� � � :
gY ��_
c, Nc a�
5, �`' / �� �, �a.
'�s / / f � b �,�_�n .k`'4 / a ss� ��
� '�x �� .� �,� �,
'� Y
F J �° d� s
' �/ � : . � �. �. � � �� Ez-'::
�.� � � �, �� ��� . �'� e z x � �, ��c� �,�� �d �a � � �
�� � ��' � � �'�"�,�'�^,���. �x���g�''��� ���i�e ����� ��°'�,�,��,� .
���� a ��� Y� `���"'n. �� �,��� � � ,, i�� � e�F��� s' � � r ��, € � '���� '��� �
� ��. ,� � �,,,3-e�
tl�<"
�
�������*��g°�i��o�/ i���y�3',� r � � ��e".� � �
i i/ L.0�..,,.e .,,.�fi c..a„c.?3C���:6�'u'�'.��`'� .. '?a�: .eiR€was,ss�� a . .
Drawing from page 17
This is from the church property looking down Linnet Lane to the apartment
bui{ding. There should be a wall enclosing the garage so there is no access from
Linnet Lane and from the church parking lot except for the locked gate in the wall.
� §
, 4 r �
`�. � �.�,f ,���' � ��z�''...
� �,.�,$ r
�� ''�� '�..��
; ,� � � �r s � y ��w.�3�`� r'�,
.�. . .,-n Y a ,��"' ;'�,& @r�`^
�� � �� ' �t � '
� ��� � �
'�� ,� � � �'� � `�
' �,�; �:��` �'�� + �'��'�� ��
< � a. ..w A, � ��
� ;
� _..-,�.,+-r _' � ` x"� �' ��'"�°��+� � �,� ��°��
,€ a � ���
,�, ..�,-..,»,,�,.�..^.. _..,�, ,,,y_> � � „� '> ' ;
, �
. �S � � ' �,�� �, �
��,<�,: y,. ,
� H��� �� � �A;
� � - _ �� , � ��� � . � � �'� ��
� �m, _.n.�, n.. ��,: �� , � � ���
�
� �: .. ,_ � �� �- �°�"� �«�� �
�� :
� . 4 4 ' . . ., .ag
�F �
` i . �
_ , � � �� _, �a �.� a� �. > �a '
� _. ..._ ..� s
�°.. � ��� _
_. � e -
_ _ ,�€, F�s��
_ � :�
�., � ,
� ,_ � � � � � ,� � � � � � �� b�8
. �
�
._ . ., - � � . �;�
__. �
, ,
-
. ,�� :
_ � ��
� � � �
. �
� � � ���� � � ���g�� ��� �
9
.. . , . A Y't�k . . r" � � �
.... . , q �ffiEb;a "`YK,S ttu� m ����?9.� . b�g��a�
Ey '
� 9
'� ,.s. " w � sx
. � y 'W :1` 3:� � .
ae",� '"�`"�`,�.� w,a,.a:z�.�p�,.��: �° tv�
w, ,�..^�.°'�'.t;�`.,:..�.�-n.,�aa �,�£��`+�� -�,�: � .`�.��t,�'�,�{j . . . , _ ., l, �
� >�
., e-.'.�....,.. ,
��t�,,,>, . .. � .;.
.� � .. � .. ��
. � ��. .. ^: i
. � �:�;�+� � �' b� . "��..
� '�'w! _ ��� �,�x �s s�, M
���, g;�� ; � � �
�� � �r , � � ��� � �,���z �
, �, � �-�. � �, �,
,, : q�� �, .,- ' .... £�'3 r�j�.` 9 �
y a . a�
� � � .,, a�_ �.iai�. ��3. � x d�;���' � ..:�o .�.k...,w �,� 'N i' �:3 t ut :�r
Drawing from page 25 of the proposal
This is wrong! There is NO open road access to linnet Lane. There should be a
locked fire truck access wall/gate only (NOT FOR PUBLICE USE) There should be
NO car and pedestrian access to the shopping center at this angle. There should
be a wall drawn of the apartment complex.
Drawin� 28
The Use Permit item 25 concerning Stucco Wail Top Detail said to avoid sheet
metal cap fiashing).
What is the difference between the metal coping and sheet metal cap flashing?
PARKING STALL COUNT FROM SHEET 5 OF THE PROPOSED SITE PLAN OVERLAY
Handy
REG Cap
LOCATION 815 19
Truck turn on parking spaces should not
Truck turn in Garage 18 count
Upper Deck Parking Structure 112
Lower Deck Parking Structure 120
Building 4 9
Building 4& Building 1 2 2
Building 4 12
Retail A&Building 4 23 2
Retail A&Building 3 33 2
Parking Structure & Retail B 3
Apartments 33
Retail B 8
Building 3 17
Building 3 &Retail A 7
Building 3 &Retail A 8
Retail A 11 2
Building 3 2
Building 2 6 2
Building 2 6
Wolfe Road 16
Wolfe Road 22
Wolfe Road 13
Wolfe Road &Homestead corner 2
Homestead Road 14
Homestead Road 11
Building 5 7
Building 5 7
1 st row parking from building 5 25
2nd row parking from building 5 27
3rd row parking from building 5 32
4th row parking from building 5 32
5th row parking from building 5 30
6th row parking from building 5 31
parking against building 2 and
building 1 26 5
This number should not count until final
cleaner toxic clean-up site - building 1 13 Certification is give by DTSC
Existing Buildings Bank&Pub 58
Pub and Retail A 6 Is this part of the 58 number?
FRONT OF CHURCH 17
�,�-��� � � �/����
� � "
��
Simon Vuong
From: Holly Lofgren [halof@sbcglobal.net]
Sent: Monday,August 05, 2013 8:25 PM
To: Simon Vuong
Subject: Re: Cupertino Village project, 10825-10983 N Wolfe Rd
Simon,
Thank you very much. I assume the Excel file from the 2011notification is complete.
Holly Lofgren
From: Simon Vuong <SimonV@cupertino.org>
To: 'Holly Lofgren'<halof@sbcglobal.net>
Sent: Monday,August 5, 2013 5:31 PM
Subject: RE: Cupertino Village project, 10825-10983 N Wolfe Rd
Holly,
As requested, please see the attached Modification application and list of addresses who were noticed. Also,please see
the attachment for evidence of noticing for your address for the original application back in 2007/2008(1655 Martin Ave
is highlighted on sheets 2,4, and 6). Note that different application types have different noticing requirements per the
City's ordinance: For the original approval, a noticing radius of approximately a quarter mile was used as a courtesy; for
the Modification permits,a radius of 300' was required. Thank you.
Simon S.Vuong
Assistant Planner
City of Cupertino
(408)777-1356
simonvl��cupertino.or�
From:Holly Lofgren[mailto:halof@sbcglobal.net]
Sent:Monday,August O5,2013 3:55 PM
To: Simon Vuong
Subject:Re:Cupertino Village project, 10825-10983 N Wolfe Rd
Simon,
You have not provided the requested information or replied to the email below. I would like, (from email
below)
"Again, I am requesting copies of'the notices and information about who was noticed."
There was apparently a public hearing in 2011 for a"Use Permit Modification". I would like the date of the
2011 hearing, copies of the notice that went out and a listing of who it was distributed to.
I would like any other notification regarding the project.
If you do not respond within 48 hours, (I originally requested this information August 1 st)I will take that to
mean that the City of Cupertino is communicating that no other noticing was done besides the 2008 letter and
the (current)2013 letter.
i
Thank you.
Holly Lofgren
Sunnyvale Neighbor
__ __ _ _ _
_ _ __ _ __ _ _ _ _ _ _ _
From:Holly Lofgren<halof(�sbc�lobal.net>
To: Simon Vuong<Simon���ci�cupertino.ar�>
Sent:Thursday,August 1,2013 7:08 PM
Subject:Re:Cupertino Village project, 10825-10983 N Wolfe Rd
Simon,
Thank you for the noticing doc and the hearing doc. Two things:
First, there must have been another notice, likely prior to this one. Would you please locate it and send it to me
-Thank you. Second, I do not see my address in the attached mailing list- 1655 Martin Ave. Do you?
I appreciate your promptness.
Holly
_ _. . _ __ __ __ _ _ _ __ _ _ _ _ __ _
From: Simon Vuong<SimonV(cr�,cupertino.or�>
To:'Holly Lofgren'<halof(ci,sbc�lobal.net>;Gary Chao<GarvC(a).cupertin�.or�,>
Sent:Thursday,August 1,2013 5:33 PM
Subject:RE:Cupertino Village project, 10825-10983 N Wolfe Rd
Holly,
As requested, please see the attachments for evidence of noticing as well as the staff report and packet for the April 15�',
2008 City Council meeting. Please also click on the following link for videos of previous public hearings(the item was
heard before the City Council on April 15`�',2008):
http://www.cupertino.org/index.aspx?page=482
Thanks.
Simon S.Vuong
Assistant Planner
City of Cupertino
(408)777-1356
simonvt"rr�,cupertino.or�
From:Holly Lofgren fmai(to:hatof(ci)sbc�;lobal.net]
Sent:Thursday,August O1,2013 5:27 PM
To:Gary Chao
Cc: Simon Vuong
Subject:Re:Cupertino Village project, 10825-10983 N Wolfe Rd
Dear Mr. Chao,
Thank you for your email. I don't want you to misunderstand me, however. I an investigating whether or not I
2
was properly notified of the public hearing. Again, I am requesting copies of the notices and information
about who was noticed.
I was not in any community discussons, so there is nothing for me to recall! I received one notice and then was
told the project was on hold and I would receive notice again when a hearing would it held. No further notice
was received.
Finally, please do not anticipate that sending me copies of the material from hearings I did not know about, after
the fact, is sufficient. Thank you.
Holly Lofgren
Sunnyvale Neighbor
From:Gary Chao<Gar�C�cu�rtino.or�>
To:Holly Lofgren<halofa�sbc�lobal.net>
Sent:Thursday,August 1,2013 1:11 PM
Subject:RE:Cupertino Village project, 10825-10983 N Wolfe Rd
Holly,
Yes the shopping center receivcc�approval for[he project back in 2008. Simon ��ill be forwarding you some key info on
the original use pertnit staff'report to the Planning Commission, City CounciL video log of the hcarings, and noticing
information relating to that application. tAs I rectill, many of the nei�;hbors, �includii�g stafFmembers from the City of
Sunnyvale Planning Dep�irt►nent participated it1 the public hearin�;proceedings aiid voiced coimnents. Hopefi�lly you'll
have the opportunity to�o through some of those records and recall same of the community discussior�s from 2008.
'I`hank vou.
Gary Chao
Citv Planner
Community Development Department
10300 Ton•e Avenue
Cupertina,CA 95014
� 408-777-3247
7 408-777-3333
� ,�t � ,��������
�,""'� ple�i�e consider the environment befqre priutin47 tl�i.email.
From:Holly Lofgren fmailtc�:halof(�r�,sbcglobal.net]
Sent:Thursday,August O1,2013 12:56 PM
To: Gary Chao
Subject:Cupertino Village project, 10825-10983 N Wolfe Rd
Dear Mr Chao,
3
I am responding to your letter(undated but delivered to my home via U.S. mail yesterday, July 31st, 2013 titled
Notice of Public Hearing,Application Number ASA-2013-05.
I would like information regarding the notification that was given to the neighborhood regarding this project,
including the date/time of the notices and what the distribution was(how many homes and at what distance).
Your Project manager, Simon Vuong told me yesterday via phone that this project was approved in 2008. I
would like information regarding all neighborhood notification from the beginning of this project and then
copies of those notices asap.
I left a message for your in regards to this request at 408-777-3308 earlier this morning.
Holly Lofgren
Sunnyvale Neighbor
4
,��=t°� � l �'���i�
Simon Vuon � �'�� t
From: Beth Ebben on behalf of City of Cupertino Planning Dept.
Sent: Wednesday, August 07, 2013 4:31 PM
To: Simon Vuong
Subject: FW: URGENT REQUEST-Cupertino Village shopping center
Attachments: Dear Honorable Mayor and Cupertino of City Council Members.docx; Email re notifications,
Simon.docx; M-2011-03, 04, 05 (Noticing).pdf; U-2007-06, ASA-2007-10 (Noticing).pdf
Categories: 24-Hour Response
From the Planning Department's general mailbox:
From: Holly Lofgren [mailto:halof@sbcglobal.net]
Sent: Wednesday, August 07, 2013 4:21 PM
To: City Council; Orrin Mahoney; Gilbert Wong; Barry Chang; Mark Santoro; vsinks cu�ertino.org
Cc: Council@sunnyvale.ca.gov; City of Cupertino Planning Dept.; Gary Chao
Subject: URGENT REQUEST- Cupertino Village shopping center
Dear Honorable Mayor and City Council Members,
The residents of Sunnyvale are very concerned about the pending planning meeting scheduled for Thursday,
August 8th at SPM (tomorrow). We are asking you to postpone this meeting or any meeting where a building
permit could be issued. Instead we ask for an EIR for this proposed development at Cupertino Village shopping
center.
Please see my letter attached along with the supporting document and email from Cupertino Planning regarding
the legally required noticing in 2011.
Sincerely,
Holly Lofgren
Sunnyvale Neighbor
� � _,c.��.3vt � 1
����13 i�-�I n�c� �
RECEIVED Au ust 7 2013 .�
g ,
Cupertino Mayor and City Council AUG 0 7 2013
City of Cupertino
10300 Tore Avenue BY. ��
Cupertino, CA 95014
Dear Honorable Mayor and Cupertino of City Council Members,
I am a resident of Sunnyvale who lives within walking distance of Cupertino Village shopping center. I
would like to raise a concern regarding activity coming from the city staff, particularly the planning
department of Cupertino.
I ask you to intervene at your earliest opportunity as these activities are premature and do not follow a
proper public process. The hearing planned for Thursday, August 8th at 5PM should be postponed on
the basis that:
a) The project lacks its own EIR, the previous (mitigated negative declaration) report no longer
being valid under CEQA,
b) The neighbors were not properly notified of a use permit extension in 2011 and
c) The neighbors on Linnet Drive and surrounding streets have an extensive list of discrepancies
between the conditions set forth in 2008 and the current plans.
In place of the planning department's hearing the planning department should be instructed to require
an EIR for the desired development at Cupertino Village. A public hearing to determine that an EIR is
required is not necessary as it is clear from the data below that an environmental review is required, but
if this is the only method to administer these policies,then we request that you hold a public hearing to
enact this requirement.
As you know, in 2008 the Cupertino City Council approved a plan to develop Cupertino Village shopping
center based upon a very light environmental review. Many concerned neighbors from Sunnyvale
attended the hearings and complained vehemently about the inadequacy of the city's requirements for
the development. The final report and use permit included a long list of conditions related to parking,
access, noise privacy and many other items.
Five years transpired and many projects, most notably the proposal to build the Apple II mega-campus
adjacent to this property, have been planned or begun. This project's EIR rated the intersection of
Homestead and Wolfe at a grade of'D'with unacceptable delays and as well as the 280N ramp on
Wolfe.
At this time, and unbeknownst to almost all the neighbors, this 5 year old project is now back on as the
developer, Kimco Realty has requested a building permit. This permit is being requested even though
the superfund site (listed by Envirostor, a website of the California Department of Toxic substances
Control) at the location of the old dry cleaners is not ready for demolition. It will not be available until
at least 2015,contrary to the planning department's diagrams.
MV historv with the prolect:
In 2007 and 2008, I received some notices of the initial plans for this project from the Cupertino
Planning department. I spoke to Gary Chao on the phone and expressed some concern about traffic and
an already full parking situation for which new retail space should not be helpful. He told me that the
next hearing had been postponed and that the project would likely be shelved anyway. I asked to be
noticed about future hearings and he said that would be the case.
Shortly after the City Council public hearing in April 2008, I learned of it. I had not been noticed, but
apparently all of my neighbors had. In light of the past nature of the activity, I decided to let this issue
go. Years past by.
Of course,the Apple II campus was announced and I believe you are well aware of those activities. The
date for public comment on Apples' EIR was July 25, 2013.
On July 31, 2013, I received a notice of the impending hearing to issue building permits for this project. I
was amazed. I understand that a sign was posted with an original hearing date ofJuly 25th but the city
had to change that when they were informed by a member of the public that the neighbors had not
been properly noticed. (The date on the sign is now August gtn )
Also, unbeknownst to most neighbors, in November 2011 the city granted an extension to Kimco Realty
for use permit. (And changed some conditions.)
Discrepancies with CEQA�uidelines:
Originally, in 2008,five years ago, a mitigated negative declaration was prepared, no EIR was performed.
According to the California Code of Regulations, Subsequent EIR's and Negative Declarations, and
section 15163, Supplement to an EIR (attached), when conditions change a new EIR or negative
declaration is required as the original EIR or negative declaration no longer adequately analyzes the
original circumstances.
If"substantial changes occur with respect to the circumstances under which the project is undertaken..."
or if"new information of substantial importance which was not known and could not have been
known... in which significant effects previously examined will be substantially more severe than
shown"... previously.
According to regulation 15073.5, Recirculation of a Negative Declaration Prior to Adoption, "A lead
agency is required to recirculate a negative declaration when the document must be substantially
revised" when "A new, avoidable significant effect is identified".
The Apple II complex alone, expecting to create over 50,000 more automobile trips to the area on a daily
basis would constitute both a substantial change to and new information regarding the traffic impacts of
development to the area.
This law, and other relevant data that could be gathered, would clearly indicate that a full EIR is now
required of Kimco Realty before they are allowed to develop the Cupertino Village shopping center.
And,this is not withstanding that there may be other rules, laws and public policy that governs why a
thorough environmental review needs to occur before building permits may be issued to Kimco Realty
for the proposed Cupertino Village development.
Unless the Cupertino City Council wishes to acknowledge that they do not intend to pursue the Apple II
campus and would set aside this project,then circumstances have changed dramatically due to the
Apple II project,the development of the Homestead Square project, additions to the Markham
apartments, and other projects in an intensifying and heavy building spree along Homestead Road,
Wolfe Road and other streets nearby.
Obviously the traffic situation is much different than it was in 2008 and this would be the main basis for
the need (there are other issues)for a thorough environmental review before development begins at
the Cupertino Village shopping center. Additional traffic caused by further development at Cupertino
Village will likely cause bottlenecks on Homestead effecting Wolfe, Linnet, Heron and other streets. The
problem of cut-through traffic will likely become worse.
Lack of proper public process and proper noticin�of the public:
Upon investigation,the noticing history from the city shows these discrepancies:
a) The November 2011 hearing notice was required to be distributed to neighbors within 300 feet
of the project. In fact this was not accomplished. Only two homes on Linnet Drive were noticed.
One of the most vocal opponents whose home is 50 feet away from direct impact was not
included. A string of homes, all 50 feet from the proposed parking garage were not noticed.
Only 35 homes were noticed in all.
b) The April 2011 hearings included hundreds of notices to neighbors within% mile. I received a
list from the planning department of who was noticed. All of my neighbors on Martin Avenue
were listed, but my house was inexplicably not included in this list. (This occurred after I had
spoken to Gary Chao and had given my name.)
c) The original sign posted on Cupertino Village Property showed the planning commission hearing
on July 25th,the same day as the termination day to accept public comment regarding the Apple
II campus EIR. It was only after residents complained that the city noticed the neighbors and
then had to change the date of the hearing to August gtn
d) The city has had to be repeatedly reminded to give notice to the neighbors. Perhaps they have
too many projects on their plate to be able to give proper attention to these needs.
I have documentation of all of these discrepancies. The noticing lists were sent to me by the planning
department and the email for that is attached.
Discrepancies between the conditions set forth in 2008 and the current plans
As mentioned above,the neighbors opposed this project in 2008 and the final use permit was
predicated on a long list of conditions related to parking, access, noise, privacy etc. A comparison of the
old plans to the current plans,via the conditions list, indicates a tremendous number of discrepancies.
These complaints have been compiled into an over 30 page document and submitted to the Gary Chao
of the planning department earlier this week. It can be found at this location as well.
https : //www.dropbox.com/s/Ocusllk4fr98h2p/Letter To Gary Chao.pdf
The number of discrepancies seems to indicate either an enormous number of oversights due to lack of
proper attention (how many projects can the city actually accomplish with the quality the community
deserves) or some type of desire for intense speed. We are asking that,once the EIR process is
completed, and assuming the project goes forward at all,that each and every condition set in 2008 be
reviewed and remedied.
Additionally, as previously mentioned,the planning department granted an extension of the use permit
in 2011 which included a modification of the parking requirements. As you must know,the shopping
center is extremely popular and patrons often circle the lot in search of parking at the current time.
Building more retail space on this site was a key concern in 2008 and so the number of parking spaces
was a key issue, (among a whole host of other very important and concerning topics.) The failure of the
planning department to properly notify the citizens of this hearing which resulted in the granting of this
condition change is very poor behavior and should be rectified through good governance.
Again, I request that you table any action regarding the issuance of building permits and instead insist
upon an EIR for the proposed development at Cupertino Village shopping center. Many, many neighbors
agree with this approach which would be the fairest and most just way to resolve these issues. Given the
problems we have had, community members should have review of the organization chosen to conduct
the EIR and the criteria it evaluates.
I am sorry for the short notice of this request. As you can see I just found out myself of this situation
and it has taken several days to even piece together the main facts involved. I would have appealed to
you at your August 6th council hearing, but it was canceled.
Thank you for your service to the public,to open government and to fair dealing.
Holly Lofgren
1655 Martin Avenue, Sunnyvale
Member of Ortega Park Neighborhood Association and Birdland Neighborhood Association (household)
Chairperson, Friends of the Fremont Pool
Recipient of the 2001 City of Sunnyvale Award of Excellence
cc. Sunnyvale City Council and Mayor
cc. Cupertino Planning Commission
cc. Gary Chao, Cupertino Planning Department
�C���� '� � `����/�
� Y�'-a
Simon Vuon
From: Jeremy Hubble[jghubble@gmail.com]
Sent: Friday, July 19, 2013 10:45 AM
To: Simon Vuong
Subject: Support for Cupertino Village Expansion
Categories: 24-Hour Response
Simon -
After hearing from other neighbors about concerns for the Cupertino Village expansion, I
would like to encourage the city to continue to allow expansion to take place.
The shopping center is thriving, and now that the economy is booming, it would be a good time
to continue with the long-delayed expansion.
The only concern I have is the possible increase in traffic on Homestead of Pruneridge
closes. However, since Apple is proposing the closure of Pruneridge, they should be the ones
to propose the appropriate remedy to the shopping center. (Perhaps the city should simply
require them to reroute, rather than close the street.)
Thank you,
7eremy Hubble
�
���� '� � ����/�
�� ���� �
Simon Vuon
From: Beth Ebben on behalf of City of Cupertino Planning Dept.
Sent: Tuesday,August 06, 2013 8:01 AM
To: Simon Vuong
Subject: FW: Cupertino Village Expansion
Categories: 24-Hour Response
From the Planning Department's genernl mailbox:
From: Raj Singh [mailto:rajCc�rajansingh.com]
Sent: Monday,August 05, 2013 2:17 PM
To: City of Cupertino Planning Dept.
Subject: Cupertino Village Expansion
H i,
We're residents at 808 Shetland PI,Sunnyvale CA which is the adjacent neighborhood to the Cupertino Village expansion
—I would like to hear or know how to get more information RE:the expansion and how it might impact our
neighborhood...
Raj
1
.���� � 1 ��'��1�
�a �.�-���
Simon Vuong
From: Russ [russcole@gmail.com]
Sent: Thursday,August 01, 2013 8:42 AM
To: russ cole
Subject: Re: Public Hearing Information for Cupertino Village Architectural and Site Approval
Hello Simon,
Have the concerns of the Sunnyvale residents afffected by this project been addressed?And if so, which
concerns are those?
Thanks,
Russ
On Wed, Ju131, 2013 at 12:00 PM, Simon Vuong<SimonV���,cupertinc�.or�>wrote:
Please find the attached public hearing notice for the Cupertino Village ASA scheduled to be heard at the
Administrative Hearing meeting on Thursday, August 8, 2013. Property owners within .20 miles
(approximately 300') will also be receiving this notification. The agenda will be posted tomorrow, and will be
accessible by clicking on the following link:
http://�v«����.cupertino.or�i/inde�:.aspa?pa�;e=1 121
If you have any questions, please contact me at your earliest convenience. Thank you.
Simon S. Vuong
Assistant Planner
City of Cupertino
(408) 777-1356
simonv<cr�,cupertino.or�
i
Simon Vuong
From: Russ[russcole@gmail.com]
Sent: Friday, July 19, 2013 9:17 AM
To: russ cole
Subject: RE:Shopping center on Homestead Road&Linnet
Categories: 24-Hour Response
RE:Shopping center on Homestead Road&Linnet
Meetings?Times and places?
Please add me to any email lists for meetings, etc. I would like to attend them.
Thanks,
Russ
408.732.6352
i
,,t��-�� � I ���I.3
,a� ;���
Simon Vuong
From: Gary Chao
Sent: Friday, July 19, 2013 4:39 PM
To: Simon Vuong
Subject: Fwd: ASA-2012-05
FYI-pls respond? Thx
Sent from my iPhone
Begin forwarded message:
From:SK_management<mana�ement@shen�kee.com>
Date:July 19, 2013,4:02:52 PM PDT
To:<�arvc@cupertino.or�>
Subject:ASA-2012-05
Dear Mr. Chao:
I am a business owner located within the referenced proposal project. I would like to acquire the
information and/or the submitted Proposal for reviewing purpose prior to attain the scheduled hearing
on Aug. gtn
If site plan and the proposed plan has email file, I would like to request such information.
Thank you very much for your prompt action in this matter.
Best Regards,
Ricky Wong
Sheng Kee Bakery
(415)468-3800 x 106
1