13050138 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 10367 SAN FERNANDO AVE CONTRACTOR:SERVICE CHAMPIONS PERMIT NO:13050138
OWNER'S NAME: G,LAYDS CAMPIDONICA 7020 COMMERCE DR DATE ISSUED:05/20/2013
OWNER'S PHONE: 4082553564 PLEASANTON,CA 94588 PHONE NO:(925)4444444
I LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION: RESIDENTIAL COMMERCIALS
I?70q o - REMOVE AND REPLACE FURNACE IN SAME LOCATION
License Class
Contractor F C)tc.P, (�6t la t�an s Date ' _)
I hereby affirm that I am licensed under the provisions of Chapter 9
(commencing with Section 7000)of Division 3 of the Business&Professions
Code and that my license is in full force and effect."
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$5755
I have and will maintain Worker's Compensation Insurance,as provided for by
Section 3700 of the Labor Code,for the performance of the work for which this APN Number:35712004.00 Occupancy Type:
permit is issued.
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED
correct.I agree to comply with all city and county ordinances and state laws relating WITIIIlv I D YS OF PERMIT ISSUANCE OR
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We)agree to save 180 DAY LAST CALLED INSPECTION.
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the
Issued by: Date:
granting of this permit. Additionally,the applicant understands and will comply
�� 3
with all non-point source regulations per the Cupertino Municipal Code,Section
9.18.
0 1L 0- I ROOFS:
r
Signature � Date J All roofs shall be inspected prior to anyy roofing material being installed.If a roof is
installed without first obtaining an inspection,I agree to remove all new materials for
inspection.
❑ OWNER-BUILDER.DECLARATION Date:
Signature of Applicant:
I.hereby affirm that Iam exempt from the Contractor's License Law for one of
the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
I,as owner of the property,or my employees with wages as their sole compensation,
will do the work,and the structure is notintended.or offered for sale(Sec.7044,
Business&Professions Code)
I;as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE
construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the
California Health&Safety Code,Sections 25505,25533,and 25534. I will
I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous
I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous
Compensation,as provided for by Section 3700 of the Labor Code;for the air contaminants as defined by the Bay Area Air Quality Management District I
will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and
performance of the work for which this permit is issued.
the Health&Safety Code,Sections 25505,25533,and 25534.
I have and will maintain Worker's Compensation Insurance,as provided for by
Section 3700 of the Labor Code,for the performance of the work for which this Owner or authorized agent. Date:, -20-
permit is issued.
I certify that in the performance of the work for which this permit is issued,I shall
not employ any person in any manner so as to become subject to the Worker's CONSTRUCTION LENDING AGENCY
Compensation laws of California. If,after making this certificate of exemption,I
become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of
forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.)
Lender's Name
APPLICANT CERTIFICATION Lender's Address
I certify that I have read this application and state that the above information is
correct.I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records.
granting of this permit.Additionally,the applicant understands and will comply
with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional
9.18.
Signature Date
GENERAL PERW APPL.ICATI N q M EP
COMMUNITY DEVELOPMENT DEPARTMENT-BUILDING DIVISION! /i I
10300 TORRE AVENUE-CUPERTINO,CA 95014.3255
CilPERTFNO (4 38)TTT=B-FAX(40)777-3333-bui-d"muQcuperdnc-= misc
QPLL'IMING IAMEMAMCAL QELECMCAL QMLSCMLANEOUS
PRCL0=ADM13S �b3t�'I S(Xn fern olgn d AM# 3S-7 Z OD
"7110,4A CO CW 6V\L&0., P4009 tS5-3"--G 1.B44AM
,mm - R5o FAX
CONTACT NAME - SMAM
STREErADDRM CUT SCATF-W FAX
Q OWNM ❑ owNMZEMMM Q oWNMAGWr Ok ommAcroa IZ cmir ACrmmaiT E3 ARCM= G a mmm Q nEymnpm ❑TENANT
CONTRACTORNAMS LXMNWNU1fH 8 i*�' TYPE Bmucf
COMPANY NAME ` E-MALE. FAX
S
�+�+FFr ADDMD mAyaL2, , Or
- �STAT(, ,
` B.uc#
COMPANY NAM'•' E-MAM FAX
S'TREErADDRESS iXw SCATf.m PSOIIM
um cW �.s,a[=� 13 J&Mn-FAMMY Pi =1K W=AM Q Yr3 ret:m==i Q Y3 ]STL3X=" Q YTS
VMM Ri7 WMXARFA 13 NO FLOOD [3 m MOMMLHOM0 Q No
aFsc�rtaxr of woRx -
��
TOTAL VALUAT Cn't* � tr �V RECEMM Y•
By mp sigoatara below,I= fy to eaek of**Mowi V I=th WTedy owu�ori ag=m act ttwnds bel]aIf I have red t3sss
angficatiaa and(Iseikon Z to-provided is coazct jhwc read the Desspdam of Work��i{p it is I qFW to Cpl-/with all applicable local
mifmm=aa.dao laws reladaVzp2p�����
ewer the y fur�on P
Sigpat—ofApgc-dAg=L-
Dam 5-ZO�t�
M��AL INFORMATION REQ[JIIUD OFHCE USE ONLY
d 0ri
z�cow
'a
D STANDARD
j' -c LARGE
I) L� asAaari
1. PtLFscffpn 2011.doc reuised 06/21/11
$133.58 $133.00 % _ $266.58
Revised: 04/29/2013
Prwm*Wve Cerdflca#e of Nwlcr.2M RedArmW HY.4CAftnWiow CF-lR-ALT-HVAC
Mate zMw 18 to 13
Sited �'tSe 7 Pes
Caofidaad Flock
List Mini== Deft Area TbemurtA
0 Fmeaged Leis AFUE €I CX?P Gww 40 ft of dws added or
L3 IOPF_, m space Served by� 0fam
0 CCd 138F� 13 R 6 (CX7f1-73} if proazir."IIS be
acondwsingunit 13 EHL 13 R ORS (CZ I4I5J
13 Usher
I-E Zryp c amaw the egrngmr:mbeft fintauffit If M_tGswesys�are ani t�II��LT-gY•4C�eErh s
z rEj, aa.t r 13AML MAFW 7 MPFfir tpid r=daUa[slesl+M
VERMCAJIM SUBMARY listed below am AwHVAC Uptoa L The instafflierdeeicks whatwa*is being daoc and
picim sat of Hre appsagriaw Coo& Fsch Optkst NM do$ERS unassses dumas-be eanducto&A copy ofd=ft=shat[be left on sse ibr MW
and a ccgy gives to drebumemvn= At fid dx iia vermes 9M the wa&1sled as Ibis form spas in fed Hie work cozopleted by Bre
ilmder_The ias x=w abovcdf'res that each off owe€F4R and negidezed CFAR flims Cao haad Sgod CF-Ws 89awed)are Med an and
[kosher 1,24IIL ae of&a CF-JR and CF_�sho alae be sim sne for Esal t
1.HVAC Re�shseat Firms
• Alt HVAC laced CF-6R '*MW hMCH- NECH-21-HERS and(ft� )its 25-ITERS
CFAR fix= hfECH—21 and WZH-25
CandmscrGoofs sad lar C2<-GR farrar bMN-21-1m aa1(fur spot )MECH-25-BEES
• bdoor•C off and/or CFAR 6 MSCH-21 and(far RAit sysftm)NECK-25
.Fwnam
For Dszd <15 pati RC,CCA 2:300 CF44(ltan{#irlinimun Air Flow iie�asrrsnent},TMAH
FerPaekaged Dud kakage<15 ge va t
Mmmpted ftan dart I IlIZIF U5629 iia
Q 1.DuctMulem was dorsmeaad tobave beenpteriawly sealed and c onfrrmcd ff gl HERS vedficafim or
132_D asysOMwidtksstbsa401 wwfeatie or
133_ _ ' docs me insidwedorswWwAasbcatof
D 2.New HVAC System Requkvd Fay
. Cutis arl: Z,,geed wilt w. - Cr-6R foams~D Md&r a;p&Waeu s} 22-H M.acrd U 25-MB S
d (al ww 1d alt C.F4R iitssrG 211-,and(fcrspfit syskWECEI-22,incl 25 -
Fot-SPM Systems:Duct leakage<6 p RC,CCA>_350t ltuo,F FD; .ahtil either 13SPP orPSFF.
For Packaged IIaks:Duct kakw-5:6
E3 3.NCW Dads with MRancemew Fanns-
Inckdes=piciqgo R., CF4RRaul: MECH-04, 2&44 LS,and trxprspfftspm MECH-25-EERS
Zodkrouklowcaed gaoftmterbftm CF-4R6 NECH-20and(for q)Htsystem) 25
coil sedlow ibmacG Not am
For SpR-t Sym Dad ieakage<6peweak RC.,CCA>_301?CFMAoEL,TMAH
For Packard UW(s:Dttct kaUW<6
El 4.NeWAgEft ever 40 feet Foffis-
. hwkdMwj,&Agurrepbchgn=cfi=4D C74Rf = 11HCH4KMECi-21-HERS CFS MEi3-21
Nfu t of deeds mcoaMioned we=
Fig spEt system arpeeka� Duceleakage<15 percent
D.EXC11'"ITCR+k daft iasaleftd or muted with M bestus
Cellbractur(Dec-6eties Audorl lReRWRINVi Desjjpwls Ded"Stien Statttmebt)
: Ix"tr7g�at�isCaiiwaft suCMaft Md
. -Ia r�derlAie as aflirecsfWoms wBusj*w mdpNf=d0w C0&t*wceptvmV=sftT3tyfordwacftm Maufflad aethis CatiSeaftat'E
.IsenRyat matgtSasrFrrec m his E.aiisea� C soetcr�reraaasw+a`rafe24,
-Faris i;sd 6ifft.
• Tire d®ga framae:3dodSed Ewe s£Comp1oaee:a dre oa does se oi§sappiimlrie comPCaao:immsi
risacfiud sd�imdtri� t for +rube
1aac k1AXINE BROOKS S m
' E1�/tGE C,HAk1PIONS Dates
A m - 17fl4fl
�Z o pt»� e i r
pholkM 9-5 'iY f-
2W81 tial Con Face Fw= bfuvvh 2010