Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
11090138 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: 10490 WUNDERLICH DR CONTRACTOR:SIMON SAYS ROOFING PERMIT NO: 11090138
OWNER'S NAME: LU ER P AND YU LAN-QI 3012 BECKLEY DR DATE ISSUED:09/20/2011
OWNER'S PHONE: 4167260196 SAN JOSE,CA 95135 PHONE NO:(408)531-9700
LICENSED CONTRACTOR'S DECLARATION f— a
Z/1?
/G/��/ BUILDING PERMIT INFO: BLDG ELECT PLUMB
License Class Lic.# 71-Z -! 7 O
MECH RESIDENTIAL COMMERCIAL
Contractor 'r'h1 t3 kW �-&sg Date?-20� 2- f
I hereby affirm that I am licen ed under the provisions of Chapter 9 JOB DESCRIPTION:RE-ROOF TEAR OF TAR&GRAVEL LAY 40 LBS FELT&
GRANULATED TORCH DOWN CLASS A 18SQFT
(commencing with Section 7000)of Division 3 of the Business&Professions
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
performance of the work for which this permit is issued.
I have and will maintain Worker's Compensation Insurance,as provided for by Sq.Ft Floor Area: Valuation:$5700
Section 3700 of the Labor Code,for the performance of the work for which this
permit is issued.
APN Number:37517055.00 Occupancy Type:
APPLICANT CERTIFICATION
I certify that I have read this application and state that the above information is
correct.I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter PERMIT EXPIRES IF WORK IS NOT STARTED
upon the above mentioned property for inspection purposes. (We)agree to save
indemnify and keep harmless the City of Cupertino against liabilities,judgments, WITHIN 180 DAYS OF PERMIT ISSUANCE OR
costs,and expenses which may accrue against said City in consequence of the 180 DAYS FROM LAST CALLED INSPECTION.
granting of this permit. Additionally,the applicant understands and will comply
with all non-point source regulations per the Cupertino Municipal Code,Section
9.18. _ Issued byti Date:
Signature_ Date !-2d'20`l I
OWNER-BUILDER DECLARATION RE-ROOFS:
All roofs shall be inspected prior to any roofing material being installed.If a roof is
I hereby affirm that I am exempt from the Contractor's License Law for one of installed without first obtaining an inspection,I agree to remove all new materials for
the following two reasons: inspection.
I,as owner of the property,or my employees with wages as their sole compensation,
will do the work,and the structure is not intended or offered for sale(Sec.7044, Signature of Applicant: Date:"
Business&Professions Code)
1,as owner of the property,am exclusively contracting with licensed contractors to
construct the project(Sec.7044,Business&Professions Code). ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER
I hereby affirm under penalty of perjury one of the following three HAZARDOUS MATERIALS DISCLOSURE
declarations:
I have and will maintain a Certificate of Consent to self-insure for Worker's I have read the hazardous materials requirements under Chapter 6.95 of the
Compensation,as provided for by Section 3700 of the Labor Code,for the California Health&Safety Code,Sections 25505,25533,and 25534. I will maintain
performance of the work for which this permit is issued. compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health&
I have and will maintain Worker's Compensation Insurance,as provided for by Safety Code,Section 25532(a)should I store or handle hazardous material.
Section 3700 of the Labor Code,for the performance of the work for which this Additionally,should I use equipment or devices which emit hazardous air
contaminants as defined by the Bay Area Air Quality Management District I will
permit is issued. maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
I certify that in the performance of the work for which this permit is issued,I shall Health&Safety Code,Sections 25505,25533,and 25534.
not employ any person in any manner so as to become subject to the Worker's
Compensation laws of California. If,after making this certificate of exemption,I Ownerutho dg a enf:
become subject to the Worker's Compensation provisions of the Labor Code,I must —���-- , Date:
forthwith comply with such provisions or this permit shall be deemed revoked.
CONSTRUCTION LENDING AGENCY
APPLICANT CERTIFICATION I hereby affirm that there is a construction lending agency for the performance of Hork's
I certify that I have read this application and state that the above information is for which this permit is issued(Sec.3097,Civ C.)
correct.I agree to comply with all city and county ordinances and state laws relating Lender's Name
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes.(We)agree to save Lender's Address
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
9x--!s,and expenses which may accrue against said City in consequence of the ARCHITECT'S DECLARATION
ing of this permit.Additionally,the applicant understands and will comply
all non-point source regulations per the Cupertino Municipal Code,Section I understand my plans shall be used as public records.
9.18.
Licensed Professional
Signature Date
C (Dq Dl 3g
REROOF PERMIT APPLICATION
COMMUNITY DEVELOPMENT DEPARTMENT• BUILDING DIVISION
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
CUPERTINO (408)777-3228 • FAX(408)777-3333 • building aacupertino.org
PROJECT ADDRESS J APN# n O JV
L
OWNER NAME PHONE /
7,26
s�/� _,n/ E-MAII.
Zj C,? T
STREETADDRESS /�w (jf / STATE ZIP I © FAX
APPLICANT NAME`(+ v PHONE E-MAIL
STREET ADDRESS CITY,STATE, ZIP FAX
❑OWNER ❑ OWNER-BUILDER ❑ CYNER AGENT CONTRACTOR ❑CONTRACTOR AGENT ❑ ARCHITECT ❑ENGINEER ❑ DEVELOPER ❑TENANT
r
CONTRACTOR NAME LICENSE NUMBER LICENSE TYPE BUS.LIC.#
COMPANY NAME ,' w E-M�- FAX
90k I
STREET ADDRESS 1 ,STATE Zl PHONE
ARCHTTEECT/ENGINEER NAME LICENSE ER BUS.LIC.#
COMPANY NAME E-MAIL FAX
STREET ADDRESS CITY,STATE,ZIP PHONE
USE OF 9FD or Duplex ❑ Multi-Family ROOF AREA: VALUATION:
STRUCTURE: ❑ Commercial
42
EXISTING ROOF TYPE,:: 45 BUILT-UP ROOF 13 ASPHALT SHINGLES ❑WOOD SHAKES ❑WOOD SHINGLES 11 OTHER(SPECIFY)
REMOVE/REPLACE D_q IF NO, PLYWOOD ❑ 'h" ❑ PLYWD ❑ OSB PITCR. ROOF
❑ No
1 4 —1-:12�LAYERS: THICKNESS: ❑ 5/S" /L TYPE: ❑ CDX 1� CLASS: A
PROPOSED ROOF TYPE: LTBUII,T-UP ROOF ElASPHALT SHINGLES ❑WOOD SHAKES 13WOOD SHINGLES ClOTHER ICC-ES REPORT#
DESCRIPTION OF WORK:
IlIf
By my signature below,I certify to each of the following: I am the property owner or authorized agent to act on the property owner's behalf. I have read this
application and the information I have provided is correct. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local
ordinances and state laws relating to buil constru I authoeze representatives of Cupertino tc enter the above-identified
�rprops;LLy for inspection purposes.
Signature of Applicant/Agent Date: ^ 2 (�� 2 1l
SUPPLEMENTAL INFORMATION REQUIRED
_If building is associated with a Home Owner's Association,provide letter
of approval from HOA. : _ < w_
—Provide Planning approval to verify if there any restrictions.
Provide copy of Manufacturer's Installation Specifications.
--ide signed copy of Cupertino's Tear-Off Policy.
ReroafApp_2011.doc revised 03/02/11
CITY OF CUPERTINO
FEE ESTIMATOR-BUILDING DIVISION
ADDRESS: 10490 wunderlich dr. 7
DATE: 09/20/2011 REVIEWED BY: bob s.
FEE, APN: BP#: rVALUATION: 1$5,700
PERMIT TYPE: Minor Building Permit PLAN CHECK TYPE: Re-roof
PRIMARY SFD or Duplex PENTAMATION 1SFDWLR00F
USE: PERMIT TYPE:
WORK tear off tar and gravel, replace with
SCOPE
FEE ID ROOF AREA
s.f.
1 REROOFFRES 1,800
Ll I Li I
NOTE: This estimate does not include fees due to other Depts(i.e.Public Works,Sanitary Sewer District,School District,etc.).
Thesefees are based on the preliminaigy in ormation available and are only an estimate. Contact the De t or addh7 info,
FEE ITEMS (Fee Resohrtion 11-053 Elf 7`1/11) FEE QTY/FEE MISC ITEMS
Permit Fee: $252.00
Work Without Permit? Q Yes Q No $0.00
Stronf? Motion Fee: IBSEISMICR $0.57 Select an Administrative Item
Bldg Stds Commission Fee: IBCBSC $1.00
SUBTOTALS: $253.571 $0.00 TOTAL FEE: 1 $253.57
Revised: 09/02/2011
REROOF TEAR-OFF POLICY
COMMUNITY DEVELOPMENT DEPARTMENT• BUILDING DIVISION
ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL
10300 TORRE AVENUE•CUPERTINO, CA 95014-3255
CUPERTINO
(408)777-3228• FAX(408)777-3333•building(&cupertino.org
PROJECT ADDRESS L e TAPN#
OWNER NAME PHO - E-MAIL
STREET ADDRESS ( � f CITY, STATE,ZIP �^ FAX
CONTRACTOR NAME LICENSE NUMBER LICENSE TYPE BUS.LIC.#
COMPANY NArME ' E-MAIL FAX
aT613�r CI ,STATEZLIZ_ c PHONE _ / -Q/ (73� �` /S / z /
I UNDERSTAND AND AGREE TO THE FOLLOWING:
1. The re-roof project shall comply with all applicable provisions of the 2010 California Codes.
2. An inspection request can be scheduled up to the day before the inspection date. Please call (408)777-
3228 from 7:30 - 3:30pm (Mon-Thurs) or 7:30 - 2:30pm (Friday) to schedule the next day inspection.
For Tear-Off and Nailing Inspections, you must also call on the day of the inspection only after that
phase of the work is completed. The building inspector will be available within one hour. Progress
and Final Inspections will be given a two hour window.
3. Tear-Off Inspection is required. Any and all dry-rotted wood shall be replaced prior to this inspection.
Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either
completely knocked-down or removed prior to this inspection.
4. If plywood is installed, a plywood Nailing Inspection is required.
5. Roofing shall not be applied without first obtaining all prior inspection and written approvals from the
building inspector. Any roofing which is applied without first obtaining an approved inspection will
require the removal of all new material down to the sheathing so a proper inspection can be performed.
6. Progress Inspection is required when approximately 50% of roof covering is installed.
7. A Final Inspection and approval shall be obtained from the building inspector when the re-roofing is
completed. To receive a final sign-off, the following items will be verified:
a. Flat roofs shall have a minimum of 1/" per foot of slope and demonstrate there is no ponding.
b. Listings from approved testing agencies for all pre-manufactured products used shall be
available on-site to review at the time of the inspection.
c. Proper spark arrestor installation, vents painted, gutter/downspouts installed, debris removed.
8. NOTE: If you call for a tear-off or plywood nailing inspection and the work is not complete, you will be
charged a re-inspection fee of$126.00. The re-inspection fee shall be paid before another inspection
can be scheduled.
By my signing below, I certify each of the following is true: I am the property owner or authorized agent to act on the
property owner's behalf. I understand and agree to comply with the re-roof policy stated above. I also understand that
smoke detectors and carbon monoxide detectors are required to be installed in accordance with Sections R314 and R315 of
the 2010 California Residential Code.
2 O
Signature of Applicant/Agent: Date:
ReroofPo1icv_2011.doc revised 02/16/11
Building Department
City Of Cupertino
10300 Torre Avenue
Cupertino,CA 95014-3255
Telephone: 408-777-3228
C U P E RT I N O Fax: 408-777-3333
CONTRACTOR/ SUBCONTRACTOR LIST
JOB ADDRESS: PERMIT# ?
OWNER'S NAME: rO PHONE# 2 O D
GENERAL CONTRACTOR: ri-I 6 G ; ?9 vs A,0o6'tWUSlNESS f ICENSE#
ADDRESS:?,,^, 4 V Co CITY/ZIPCODE:
*Our municipal code requires all busine ses working in the city to have a City of Cupertino business license.
NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE
GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CITY OF CUPERTINO
BUSINESS LICENSE. r
I am not using any subcontractors:
Signature Date
Please check applicable subcontractors and complete the following information:
V SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets & Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring / Carpeting
Linoleum / Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Painting /Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Owner/Contractor Signature Date