31. SCCP Phase 1B Bothman, Inc.CUPERTINO PUBLIC WORKS DEPARTMENT Summary AGENDA I'T'EM AGENDA DATE August 5, 2008 SUBJECT AND ISSUE Awazd of a Construction Contract to Robert A. Bothman, Inc to Construct the Stevens Creek Corridor Phase 1B Project in the amount of $ 4,161,300A0. Restore $420,D00 removed on May 20, 2008 and maintain the Project Budget at $14,123,000 to perform the work needed to bring Blackberry Fazm to rediness for its opening next spring. BACKGROUND On March 18, 2008, the Council received a progress report on the Stevens Creek Corridor Project to consider final recommendations relating to the project scope, budget and schedule. Among other actions, including the approval of the final project budget of $14,123,000, the Council specifically approved the scope of the project as Phase I to be broken down into two bid packages of Phase I-A and Phase I-B. On May 20, 2008, the City Council awarded a Construction Contract to Ferma Corporation for the Construction of the. Stevens Creek Corridor Phase lA Project in the amount of $ 2,265,457.70 and approval of a Constructian Contingency in the amount $1,400,000 for the entire project (Phase IA and ]B). The Council also transferred $420,000 (the difference between the low bid and the engineer's estimate) to the General Fund Reserve. Bid Packages -Phase IA and IB The first of the two bid packages includes ali the work of realigning and restoring a segment of Stevens Creek through Horseshoe Bend adjacent to the west picnic area, including a new bridge over the creek to the west picnic area. This work has been designated-Phase I-A and as noted above has been awazded by the Council and the work began on June 16, 2008. 1 31 - 1 The remaining scope of the project includes all the work to construct the trail from McClellan Ranch up the east side of the creek where the existing golf maintenance- builduag (to be demolished) is located. In addition, this phase will demolish certain other facilities and construct a new 800 person capacity picnic area on the west side of Stevens Creek, a golf maintenance building with restrooms for the golfers, a new entry kiosk, upgrades to the picnic and golf maintenance system and a new pazking lot with a "green" engineered surface along with other site work and Landscaping. This work has been designated as Phase I-B. REPORT ON CONSTRUCTION BIDS Construction bids for the Phase IB Stevens Creek Corridor Project were received and opened on July 10, 2008 with the following results: Bidder Bid Amount % Difference ESR Construction $ 5,850,000.00 4 ENGINEER'S ESTIMATE $ 5,631,000.00* McGuire and Hester $ 4,987,000.00 (11%) Joseph J. Albanese $ 4,544,657.00 (19%) Gordon N. Ball, Inc. - $ 4,450,917.00 (2I %) Robert A. Bothman, Inc. $ 4,161,300.00 (26%) *Note: The original estimate reported to the Council on May 20, 2008 was $6,031;000.. During the bidding on Phase I-B and as construction proceeded on Phase I-A, it was deemed more expeditious to take some scope from I-B and add it to Phase I-A by -contract change order. The total estimate for this scope change is $400,000 resulting - in a reduction of the estimate for Phase I-B to $5,631,000 and a corresponding increase in the cost for Phase I-A to $2,665,000. These changes are reflected in the table of costs and budget below. The low bid from Robert A Bothman, Inc. represents an excellent price for the scope of work for Phase I-B. Staff has reviewed the bid documents and the unit prices and finds them all to be in order as required by the project specifications. 31 -2 2 Add Alternates The phase T-B Cozltract included 3 add alternates which were not a part of the base bid. These are as follows: Item Description Bid Price IA Upgrade Traii to Resin based Paving Material $ 205,200.00 IB Add Resin Pavement Overlay to Trail Base Paving $ 63,000.00 2 Add Photovoltaic system (Solaz Panels) to Golf Maint. Bldg. $ 175,000.00 Total all Add Alternates $ 443,200.00 The add alternates were not included in the budget but were only incorporated into the bid documents to determine a price should the City opt to include them: They are not necessary to complete the project. The trail construction as specified in the bid documents provides for a solid and durable surface. The resin pavement and overlay are not necessary and the payback period for the solaz panels is considerable. Staff believes that under the circumstances the money for the add alternates is better spent on repairs and upgrades to the existing facility. PROJECT BUDGET AND COSTS The prior project budget (before $420,000 was removed on May 20, 2008) is provided from previous years and from the Adopted .2007-2008 Five-Year Capital Improvement Program (CIP) and is summarized as follows: Prior City General Funds $ 601,000 Enterprise Funds (FY OS-06} ~ 680,000 Approved Grant Funds $3,729,000 General Funds (FY 07-08} 9,499,000 Transfer to McClellan Pro'ect 386 000 Total Pre-May 20 Project Budget $ 14,123,000 Pro'ect Costs Project Development / PS&E Master Plan and Environmental (FY OS-06) $ 583,000 Design and Construction Services _ 2,037,000 Admin, Fees, Site Maintenance 812,000 Construction Management 575,000 3 31 -3 Construction Construction Phase IA (Low Bid Rounded) 2,bb5,000 Construction Phase IB (Low Bid Rounded) 4,1b1,000 Add Alternates (Not Recommended) 0 Project Completion/Reopening 1,890,000* Construction Contingency 1,400,000 *See Discussion Below Total Project Cost !Budget Required $14,123,000 Project Walk-Thrau hg_by Interested Parties On June 4, 2008, staff conducted a tour for all interested residents of the Blackberry Farm area of the Stevens Creek Corridor Project. Approximately 20 people attended. Staff and the City's consultants took them on a tour of the site showing the trees marked for removal and the alignment of the new creek channel was outlined using traffic cones. Staff and the consultants addressed many questions and the entire two hours was conducted by all in a very professional and congenial fashion. Most residents who attended not only expressed appreciation for staffs tame but also felt that they learned more about the project specifics. Proieet Completion Cost for Reopening the Facility in May 2009 . Creek Restoration and Reforestation: $ 400,000 A critical part of completing this project is ensuring that the appearance and the vegetation of the newly aligned creek banks and reforestation of the area where trees and other foliage have been removed are restored to an appearance that will complement the new creek channel. The importance of this additional grading, tree planting, reforestation and natural landscaping cannot be overemphasized. Without some of the savings from the bidding process, the newly aligned creek would be minimally planted and not nearly as attractive or enjoyable until the originally planned landscaping matures, which will require a number of years. This additional reforestation was the result of the Public Works review of the construction documents prior to the first bid in April 2008. As this review ensued it became very clear that when the project was completed its appearance, until the planting provided in the then existing plans and specifications, would not satisfy the expectations of the community. The cost estimate for this work is approximately $400,000. 31 -4 Facility Maintenance and Up es: ~ $1,675,000 As reported to the Council on October 17, 2006 it is not possible to reopen the facility without addressing an extensive amount of deferred maintenance. Blackberry Farm has been in operation (prior to its closing in September 2006) for 53 years, and little has been done to maintain or upgrade the facility. This probably has been exacerbated by the two- yeaz closure of the facility and needs to be completed before reopening Blackberry Farm. In the October 2006 report to the Council, staff pointed out that the cost for the upgrades, repairs and other long overdue maintenance was at least $2,000,000 in 2006, even if the Corridor project did not go forward. The current corridor project includes approximately $500,000 of that work in Phase I-A and I-B. l-Iowever, in the time since the bids for Phase I-A and I B were being prepared, a more detailed evaluation of the facilities was undertaken by Public Works and Parks and Recreation Staff. Examples of the maintenance issues include replacing a number of electrical distribution elements in the swimming pool facility, fixing up several buildings including the snack bar and pool restrooms and dressing rooms, and repair of the water slide in the main pool. All buildings are long overdue for roof repairs, wall repairs and the entire complex needs to be painted inside and out. Some minor street repairs on the entry road should also be done. It maybe possible to add this roadwork to one of the existing street maintenance contracts by contract change order, funding it from the corridor project budget. The current budget estimate (as shown below} for the remaining work, including design and construction management is $1,675,000. For reasons unknown, this was not fiilly addressed in the project development stages in 2006-2007 and only came to light during the constructability review conducted by the Public Works Department in early 2008. Given the overall costs of the effort and the Community's high expectation for the appearance of the project, and the relative amount (13% of the total project budget} required to produce a first class result, this additional investment is urgently required. It is important to note that Blackberry Farm is a facility for the entire community where neighborhood pazks serve mostly those in the immediate vicinity such as Linda Vista Park or Three Oaks Pazk. As such, funding the complete restoration and reforestation of Blackberry Farm and the adjacent reach of the newly aligned creek channel should be of the highest priority and funding should be ahead of any new projects until this project is fully completed. 5 31-5 Cost and Funding: A very preliminary estimate of additional cost for the reforestation and facility maintenance work is summarized as follows: Electrical Service upgrades $ 300,000 Concession Stand and Kitchen 450,000 Pool and Pool Equipment Rooms 125,000 Pool Dressing rooms and restrooms 200,000 Storage and Maintenance Buildings 200,000 Design and Construction Management 300,000 Painting and Signage 100,000 Total Construction $ 1,675,000 Reforestation and Creek Landscape Upgrades 400,000 Total Reopening Budget Estimate $ 2,075,000 This additional reforestation and maintenance work was not in the final project cost estimate of $14,123,000, which was prepared and presented to the Council on March 18, 2008 and confirmed again on May 20, 2008. The intention at that time was to either add funds to the FY 2008-2009 Operating budget of both the Parks and Recreation and Public Works departments and/or apply any funds that accrued to the project from the low bids on Phase I-A and I-B to toward these efforts up to the limit of the project budget. However, when the bids for Phase I-A were received on May 8, 2408 and the low bid was 16% below the estimate, staff and the construction management consultants felt a similar response could occur with the bids on phase I-B so opted to wait until those bids were open to determine how much additional funding, if any, would be necessary for this work. As those results are now known, staff has identified the amount of $1,890,000, which is within the original project budget of $14,123,000 as the funding that can be applied to the reopening work. Even though that amount is $185,000 below the budget estimate of $2,075,000 for the work, staff is confident that with further refinement of these tasks, the original budget of $14,123,000 will be sufficient to complete the project and all the creek reforestation, facility maintenance and upgrades needed to reopen the park in 2009. 6 31 - 6 Restoration of the Proiect Budget to FuII Funding for Construction Completion As noted above, it is essential to ensure the best possible outcome of this project, and to fully ensure that the community's expectations are substantially met as well as to provide an attractive and viable pazk environment for all visitors. It is, therefore, equally essential that the City Council acknowledge the principles of project management accepted by the Council on October 17, 2006 and again on March 18, 2008. These are as follows: 1. Project Management Authority (during construction) to the City Manager and Director of Public Works 2. Restricted site access during construction 3. Maintain full funding through the end of construction In accordance with principle number 3, and to ensure. full availability of the funds identified frorai the low bids, staff is strongly recommending that the Council restore the $420,000 removed on May 20, 2008 in order to ensure accomplishing sufficient facility maintenance work as well as completing the planting and landscaping, noted above, that is included in Phase I-B. FISCAL IMPACT Funding is available in the Adopted FY 2008-2009 Capital Improvement Program as approved by the .Council on June 17, 2008. Award of this contract will encumber $4,161,300 for the construction of Phase 1B. Restoring the budget to $14,123,000 will require the transfer of $420,000 to the project budget from the General Fund Capital Reserve. Once the project is completed and the Facility is reopened, staff will reconcile all project costs and any balance of General Fund •money from the project can be reallocated during the Council's consideration of the FY 2009-2010 budget in June of 2009. CONCLUSION Blackberry Farm and Stevens Creek can and shoald be a shining example of a unique recreation facility that everyone in the community can enjoy and be proud of for generations to come. Because of the very competitive bidding market and the excellence of the bid documents prepared by staff and the consultants, the City has a unique one-time opportunity to realize that objective. This balance of savings from the low bids of both phases of $1,890,000 is vital to insure the successfiil outcome and reopening of Blackberry Farm to meet or exceed everyone's expectations. 7 _ 31-7 STAFF RECOMMENDATION Award of a Construction Contract to Robert A. Bothman, Inc to Construct the Stevens Creek Corridor Phase 1B Project in the amount of $ 4,1b1,300.00. Restore $420,000 removed on May 20, 2008 and maintain the Project Budget at $14,123,000 to perform the work needed to bring Blackberry Farm to rediness for its opening next spring. Submitted by: Submitted by: Ralph A. Qualls, Jr. Mark Linder Director of Public Works Director of Parks and Recreation Approved for Submission: ~. David W. Knapp City Manager 31 -8 g ATTACFIlVIENT "A" Blackberry Farm Additional Needs Assessment July 22, 2008 Electrical Service $300,000 The existing main service to the facility is in need of replacement and upgrade. Several main line power pales have extensive termite damage at their bases and need to be replaced by PG&E. Most of the electrical overhead wiring at the site was installed many years ago and is improperly and unsafely suspended from homemade hangers on a variety of poles, trees, and roof structures. These need to be restrung or run underground in code compliant conduit. The main PG&E transformer is currently located'on a power pole approximately 30 feet above ground and very near the Concession Stand. The pole is in poor condition and the heavy transformer adds to the possibility of the pole being blown over in a wind storm. Such an event would likely cause a fire and damage to several facilities. The transformer should be relocated to a pad on the ground. The main electrical panel, from which all other electrical services on the site are drawn, is located inside the Concession Stand. This panel does not meet any of the minimum code requirements and probably did not when it was installed years ago. The panel should be relocated to an outdoor facility of its own with underground runs to the various other structures with sub panels. Concession Stand $450,000 The existing Concession Stand is the newest structure on the site and is a concrete block wall and slab on grade structure. The roof is supported by a typical wood frame rafter system. The slope of the roof is very shallow over a Large portion of the rear of the building and does not meet the minimum code requirements of 3 in 12. The interior of the Concession Stand is laid out for preparing, cooking and serving food as well as cold locker storage and. dishwashing. The existing hood over the cooking stoves has to be replaced by code this year, regardless of what other work takes place there as part of a state wide upgrade requirement. This work will necessitate roof work and possibly interior structural work to hang the new hood properly. Very little of the Concession Stand area meets ADA clearance and access criteria and remodeling work on the structure, with a value of $85,000, will trigger the requirement to upgrade the ADA deficiencies. 31-9 Page 1 of 4 ATTAC~-IlVIENT "A" Blackberry Farm Additional Needs Assessment July 22, 2008 P&R staff would like to upgrade the facility for catering vendors for the picnic area, preserving the cooking, food storage and dishwashing capacity. They would also like to open up an enclosed section with a trellis to outdoor seating. The roof should be rebuilt to the proper slope and covered by a standing seam metal roof. Pools and Pool Epuipmen# Rooms $125,040 There are currently two swimming pools and one wading pool The two larger pools need resurfacing. One of the pools has a slide that needs replacement. The wading pool is likely to require a UV treatment system before it can be reinstated by the County Health Department. P&R would like to convert the wading pool into an interactive play fountain that in other locations around the state have become more popular and less difficult to manage and maintain. The pool pumps are in fairly good condition but their location is poor and the electrical service is -inadequate. A code compliant analysis has not been performed but they are assumed to be lacking in proper clearances, access, and ventilation. T'he filtering systems are also assumed to be out of date and in need of upgrading. The pool pump rooms are part of the larger pool dressing room structures. The two buildings are wood framed with a 3 in 12 sloped asphalt shingle roof. The larger of the two structures has a porch like roof section with a less than 3 in 12 slope that has deteriorated and appears to need new sheathing and possibly new structural members. The wood frame structures are quite likely riddled with termite damage as well since no one can recall seeing the buildings treated for termites. Pool Dressing Rooms and Restrooms $200,004 The dressing rooms and several toilet and lavatory fixtures in both the men's and women's areas will be separated from the picnic user toilet fixtures as a part of the current Phase 1B project. This will enable the piczuc users to have independent restrooms to use if they do not pay for pool access. Unfortunately, the separation work in Phase 1B does not include any upgrades to the fixtures, the interior finishes, or any ADA upgrades to the facility. Interior finish and ADA upgrades are recommended as well as a standing seam metal roof over new plywood sheathing. . 31 - 10 Page 2 of 4 ATTACHMENT "A" Blackberry Farm Additional Needs Assessment July 22, 2008 Storage, Restroom, and Maintenance Structures $200,000 There are four additional structures on the site that need attention. They are the Ice Machine building, the Restroom Storage building, the Park Maintenance Building, and the Barn Restroom Building. Ail of these are wood frame and suffer from extensive deterioration due to low maintenance, weather incursion, termites, and age. P&R intends to remove the ice machine and will no longer need the two-story building the machine is in. It can be demolished and the space can be reclaimed as a part of the Concession Stand. The Restroom Storage structure was a small men's and women's rstroom at one time, adjacent to the Concession Stand. It was converted into a storage structure at some point by the removal of the toilets and urinals. The sanitary lines were capped off and Concession Stand materials were stored in this structure. A strong smell of sewer gas is still evident in this structure and it should not be used for the storage of any item used in food service. P&R would like to discontinue its use and demolish the building. The Park Maintenance Building is approximately the size of a two-car garage with a service yard adjacent to it. This building is in the worst condition of any on the site, with holes in the roof that allow rain to enter. P&R is in the process of temporarily moving most of.the maintenance equipment irito the garage next to the Retreat Center for ease of access during the construction. The existing Park Maintenance Building is also in a very constricted location on the site and is immediately below the outdoor deck of a local resident. The building is also located on the property line, causing difficult access to a thickly vegetated slope by the residential owner. As a result, a constant and serious fire hazard exists at this location. P&R would like to demolish this structure and build a new, similar size structure with a standing seam metal roof and service yard further to the south in the larger, less fire prone area in what used to be the basketball court. The Barn Restroom Building is the remaining section of the barn that was damaged in the 1989 earthquake and torn down by the previous owners of the property. P&R does not plan to use these restrooms in the new park configuration and it is recommended that the building be torn down. Design and Construction Management $300,000 Painting and Signage $100,000 Total Construction $1,675,000 31 - 11 Page 3 of 4 ATTACHMENT "A" Blackberry Farm Additional Needs Assessment July 22, 2008 Summary of Costs for Reforestation and Facility Maintenance: Electrical Service upgrades $ 300,000 Concession Stand and Kitchen 450,000 Pool and Pool Equipment Rooms 125,000 Pool Dressing rooms and restrooms 200,000 Storage and Maintenance Buildings 200,000 Design and Construction Management 300,000 Painting and Signage 100,000 Total Construction $1,675,000 Reforestation and Creek Landscape Upgrades 400,000 Total Reopening Budget Estimate $ 2,075,000 31 - 12 Page 4 of 4 EXHIBIT S BEGIN HERE cc ~.~~od August 5, 2008 ~ ~` Dear City Council Members, Given the vast majority of Blackberry Farm customers are not Cupertino residents; Given that Blackberry Farm is amoney-looser for Cupertino; It makes no sense to continue increasing the City's indebtedness for the benefit of non-residents. Either the above facts are incorrect, or there is some other agenda motivating you to support this counter productive venture. Please explain which. We, the residents of Cupertino want: 1. A facility that benefits us and our quality of life. 2. We do not want to people from outside Cupertino to be clogging our streets with their cars and dis#urbing the tranquility of the natural open space in Blackberry Farm and McClellan Ranch with their mountain and racing bicycles. 3. We want to preserve the existing environment and even enhance it for future generations of nature lovers. 4. We want access in the form of a meandering walking path that is suitable for bird, wildlife, and nature watching. If you are unclear about what we, the residents of Cupertino want, l encourage you to have a referendum on the question, but only for tax paying Cupertino residents. 1 remain, G. William Walster, Ph. D. 22116 Dean Court Cupertino, CA 95014-2723 408-253-9577 C;~ ~ ~s~~a ~ ~ 3 Linda Lagergren From: Bower, Gail [gbower@ebay.com] Sent: Tuesday, August 05, 2008 4:57 PM To: Dolly Sandoval; Gilbert Wong; Orrin Mahoney; Kris Wang; Mark Santoro Subject: Blackberry Farm Project_bocceball court for 15k and a windmill for 27K? Please, we don't need bocce ball court or awindmill -there's already way to much stuff going on down there. We need a peaceful place to go amongst the trees and along the riparian habitat. Please keep BBF as natural as possible to support the extensive and costly habitat restoration -don't overdevelop this one of a kind property/parka That money is better spent on ensuring that the restoration needs over the next several years are met and/or use it to finally finish the'pre-project' at McClellan Ranch that is now 6 months late and get rid of the gravel and fencing etc and do some planting along the bike road. Thank you. Gail Bower Orange Ave. Cupertino, CA 95014 LS l'~ AUG ~ 2008 CU~'FRTINO CITY CLERK C'~ ~~rla~ X31 Linda Lagergren From: oleas@aol.com Sent: Monday, August 04, 2008 9:09 PM To: Dolly Sandoval; Orrin Mahoney; Gilbert Wong; Mark Santoro; Kris Wang Subject: Improve San Fernando Driveway Dear Council Members, I support bid 1B. Additionally, I heard there was a chance that the surplus for bid 1B at Blackberry Farm might be redistributed to another project. Please keep this project money at Blackberry Farm and improve the park entrance off San Fernando Drive or plant more mature vegetation. Thanks, Luanne Oleas, a concerned voter It's time to go back to school! Get the latest trends and gadgets that make the grade on AOL Shopping. Q ~~~~~~1~~~1 ~, ~ ~ AUG 5 2008 ~~~ ~ I ~~ GU~'ERTIPJO CITY Cl_FF~K ~, i cc ~~s~od #3/ Linda Lagergren From: Norm Donovan [norm.donovan@yahoo.com] Sent: Tuesday, August 05, 2008 11:10 AM To: Orrin Mahoney; Dolly Sandoval; Mark Santoro; Kris Wang; Gilbert Wong Subject: Support for widening Blackberry access from San Fernando Avenue We understand that tonight the Council will be discussing Phase 1B of the project to rebuild Blackberry park. We are writing to urge you to approve Phase 1 B AND to leave funds in the project to support widening access to the park from San Fernando Avenue. It is critical that the park access road support safe sharing of the road by pedestrians, bikers and automobiles. Sincerely, Norm Donovan Nancy Price 10185 Scenic Blvd '~ ~~~~~~ AUG 5 ?_008 CUPERTlt~p CITY CLERK LC k~S~O~ #31 CITY OF CUPERTINO PROJECT: STEVENS CREEK CORRIDOR PARK -PHASE 1B PARK AND TRAIL FILE NO: 92,069 BID OPENING: July 10, 2008, 4:00 P.M. EST ROBERT A. BOTHMAN, INC. GORDON N. BALL, INC. ITEM QTY UNIT DESCRIPTION UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1 1 LS MOBILIZATION $ 220,257.00 $ 220,257.00 $ 450,000.00 $ 450,000.00 2 3,297 CY VIRGIN MATERIAL AGGREGATE BASE $ 76.00 $ 250,572.00 $ 50.00 $ 164,850.00 3 .301 CY REGULAR AGGREGATE BASE $ 38.00 $ 11,438.00 $ 70.00 $ 21,070.00 4 1 LS REMOVE PICNIC FACILITIES $ - $ - $ 10,000.00 $ 10,000.00 5 1,718 SF REMOVE CONCRETE $ 3.00 $ 5,154.00 $ 5.00 $ 8,590.00 6 2,527 CY REMOVE AC (ROAD AND WALKWAY) $ 1.00 $ 2,527.00 $ 40.00 $ 101,080.00 7 2,390 SY REMOVE AC (PARKING LOT) $ 1.00 $ 2,390.00 $ 5.00 $ 11,950.00 8 356 LF REMOVE AC CURB $ - $ - $ 5.00 $ 1,780.00 9 403 LF REMOVE CONCRETE CURB AND GUTTER $ 4.00 $ 1,612.00 $ 5.00 $ 2,015.00 10 2,319 LF REMOVE FENCE $ 2.00 $ 4,638.00 $ 5.00 $ 11,595.00 11 4 EA REMOVE HORSESHOE PIT $ - $ - $ 500.00 $ 2,000.00 12 1 LS ABANDON UTILITIES $ 26,800.00 $ 26,800.00 $ 50,000.00 $ 50,000.00 13 1 LS REMOVE UTILITIES $ 14,700.00 $ 14,700.00 $ 20,000.00 $ 20,000.00 14 1 LS ABANDON EXISTING PUMP STATION $ 3,600.00 $ 3,600.00 $ 2,000.00 $ 2,000.00 15 1 LS REMOVE EXISTING GOLF MAINTENANCE BUILDING AND YARD $ 7,500.00 $ 7,500.00 $ 5,000.00 $ 5,000.00 16 0 LS REMOVE EXISTING ENTRY KIOSK BUILDING - NIC $ - $ - $ - $ - 17 1 LS HAZARDOUS MATERIALS REMOVAL AND DISPOSAL $ 8,245.00 $ 8,245.00 $ 15,000.00 $ 15,000.00 18 1 LS CLEARING AND GRUBBING $ 4,000.00 $ 4,000.00 $ 25,000.00 $ 25,000.00 19 8 EA REMOVE AND CHIP TREE $ 250.00 $ 2,000.00 $ 1,000.00 $ 8,000.00 20 5 EA REMOVE SHRUB $ 100.00 $ 500.00 $ 200.00 $ 1,000.00 21 12 EA ADJUST UTILITY VAULTS/MANHOLES TO GRADE $ 1,230.00 $ 14,760.00 $ 300.00 $ 3,600.00 22 3,900 CY EARTHWORK (CUT) $ 16.00 $ 62,400.00 $ 15.00 $ 58,500.00 23 260 CY EARTHWORK (FILL) $ 16.00 $ 4,160.00 $ 20.00 $ 5,200.00 24 3,326 CY 95% COMPACTED SUBGRADE $ 16.00 $ 53,216.00 $ 12.00 $ 39,912.00 25 1 LS TEMPORARY WATER POLLUTION CONTROL $ 6,100.00 $ 6,100.00 $ 10,000.00 $ 10,000.00 26 1 LS PREPARE SWPPP $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 27 6 EA TEMPORARY CONCRETE WASHOUT $ 1,000.00 $ 6,000.00 $ 100.00 $ 600.00 28 1,000 LF TEMPORARY HIGH VISIBILITY FENCE $ 3.40 $ 3,400.00 $ 2.00 $ 2,000.00 29 1,000 LF TEMPORARY SILT FENCE $ 2.00 $ 2,000.00 $ 2.00 $ 2,000.00 30 1 LS SITE SECURITY AND TEMPORARY FENCE $ 2,513.00 $ 2,513.00 $ 5,000.00 $ 5,000.00 31 1 EA TEMPORARY CONSTRUCTION ENTRANCE/EXIT $ 2,667.00 $ 2,667.00 $ 1,000.00 $ 1,000.00 32 2,225 LF FIBER ROLLS $ 2.60 $ 5,785.00 $ 5.00 $ 11,125.00 33 14,906 SY HYDROSEED $ 1.00 $ 14,906.00 $ 0.70 $ 10,434.20 34 1 LS SITE DRAINAGE $ 7,200.00 $ 7,200.00 $ 25,000.00 $ 25,000.00 35 1,603 LF 2" PVC WATER PIPE $ 7.00 $ 11,221.00 $ 22.00 $ 35,266.00 36 212 LF 3" PVC WATER PIPE $ 8.00 $ 1,696.00 $ 27.00 $ 5,724.00 37 2 EA INSTALL BACKFLOW PREVENTER $ 1,150.00 $ 2,300.00 $ 3,000.00 $ 6,000.00 38 11 EA INSTALL WATER VALVE $ 181.00 $ 1,991.00 $ 200.00 $ 2,200.00 39 2 EA INSTALL WATER METERS $ 1,325.00 $ 2,650.00 $ 800.00 $ 1,600.00 SCCP Phase 1 B Bid Summary Page 1 of 9 40 1 LS CONNECT TO EXISTING WATER SERVICE $ 2,087.00 $ 2,087.00 $ 2,000.00 $ 2,000.00 41 878 LF 4" PVC SANITARY SEWER PIPE $ 98.00 $ 86,044.00 $ 35.00 $ 30,730.00 42 2 EA MANHOLES $ 7,650.00 $ 15,300.00 $ 4,000.00 $ 8,000.00 43 2 EA FLUSHING INLET $ 732.00 $ 1,464.00 $ 2,000.00 $ 4,000.00 44 20 EA CLEANOUTS $ 149.00 $ 2,980.00 $ 200.00 $ 4,000.00 45 242 LF AC DIKE $ 13.00 $ 3,146.00 $ 10.00 $ 2,420.00 46 1,408 SF CONCRETE PAVING (BUS STOP) $ 10.00 $ 14,080.00 $ 11.00 $ 15,488.00 47 1,181 SF CONCRETE SIDEWALK (BUS STOP) $ 7.00 $ 8,267.00 $ 5.00 $ 5,905.00 48 15,860 SF COLORED CONCRETE PEDESTRIAN PAVING $ 11.00 $ 174,460.00 $ 8.00 $ 126,880.00 49 11,954 SF COLORED CONCRETE DRIVEWAY $ 11.00 $ 131,494.00 $ 9.00 $ 107,586.00 50 128 SF COLORED CONCRETE BAND $ 54.00 $ 6,912.00 $ 37.00 $ 4,736.00 51 164 LF CONCRETE SEAT WALL WITH STONE VENEER $ 211.00 $ 34,604.00 $ 100.00 $ 16,400.00 52 1 EA ROUND PLANTER WITH STONE VENEER $ 13,000.00 $ 13,000.00 $ 5,000.00 $ 5,000.00 53 4 EA CONCRETE PILES WITH STONE VENEER $ 2,600.00 $ 10,400.00 $ 1,200.00 $ 4,800.00 54 790 LF CONCRETE CURB $ 19.00 $ 15,010.00 $ 23.00 $ 18,170.00 55 264 SF CONCRETE PAD (FOR GREENWASTE) $ 13.00 $ 3,432.00 $ 11.00 $ 2,904.00 56 251 SF PAVEMENT MARKING $ 5.00 $ 1,255.00 $ 2.00 $ 502.00 57 970 LF TRAFFIC STRIPE $ 3.00 $ 2,910.00 $ 1.00 $ 970.00 58 30 EA INSTALL PARK SIGNS $ 244.00 $ 7,320.00 $ 200.00 $ 6,000.00 59 14 EA ROADSIDE SIGNS $ 269.00 $ 3,766.00 $ 200.00 $ 2,800.00 60 1 LS IRRIGATION SYSTEM $ 150,000.00 $ 150,000.00 $ 150,000.00 $ 150,000.00 61 637 LF CHAIN LINK FENCE $ 40.00 $ 25,480.00 $ 55.00 $ 35,035.00 62 3 EA CHAIN LINK GATES $ 909.00 $ 2,727.00 $ 1,000.00 $ 3,000.00 63 0 EA BOULDER RETAINING WALL - NIC $ - $ - $ - $ - 64 2 EA HORSESHOE TOSS $ 4,521.00 $ 9,042.00 $ 2,000.00 $ 4,000.00 65 1 EA BOCCE BALL COURT $ 23,276.00 $ 23,276.00 $ 15,000.00 $ 15,000.00 66 3 EA BIKE RACKS $ 889.00 $ 2,667.00 $ 1,000.00 $ 3,000.00 67 2 EA BOLLARDS $ 865.00 $ 1,730.00 $ 700.00 $ 1,400.00 68 26 EA STRAIGHT BENCHES $ 1,349.00 $ 35,074.00 $ 1,200.00 $ 31,200.00 69 13 EA BARBECUES $ 3,905.00 $ 50,765.00 $ 3,500.00 $ 45,500.00 70 12 EA SERVING TABLES $ 818.00 $ 9,816.00 $ 800.00 $ 9,600.00 71 9 EA SINK/PREP COUNTERS $ 5,627.00 $ 50,643.00 $ 5,000.00 $ 45,000.00 72 108 EA WHEEL STOPS $ 71.00 $ 7,668.00 $ 55.00 $ 5,940.00 73 1 EA WINDMILL $ 27,783.00 $ 27,783.00 $ 15,000.00 $ 15,000.00 74 12 EA FRUIT LABEL BENCHES $ 90.00 $ 1,080.00 $ 125.00 $ 1,500.00 75 1 EA REPLACE DRINKING FOUNTAIN $ 5,208.00 $ 5,208.00 $ 4,000.00 $ 4,000.00 76 1 LS UPLAND PLANTING $ 135,000.00 $ 135,000.00 $ 90,000.00 $ 90,000.00 78 1 LS ORNAMENTAL PLANTING $ 115,000.00 $ 115,000.00 $ 90,000.00 $ 90,000.00 79 48,506 SF SOD LAWN $ 0.50 $ 24,253.00 $ 0.70 $ 33,954.20 80 2 EA SPECIMEN TREE PLANTING $ 1,320.00 $ 2,640.00 $ 3,000.00 $ 6,000.00 81 4 EA TRANSPLANT TREES $ 1,989.00 $ 7,956.00 $ 2,000.00 $ 8,000.00 82 2,400 SF BIOSWALE $ 6.00 $ 14,400.00 $ 2.50 $ 6,000.00 83 2,209 SF DECOMPOSED GRANITE PAVING $ 3.00 $ 6,627.00 $ 6.00 $ 13,254.00 84 16,261 SF GEOCELL TRAIL PAVING $ 4.00 $ 65,044.00 $ 1.70 $ 27,643.70 85 2,736 SF INTERLOCKING PAVING STONE $ 11.00 $ 30,096.00 $ 25.00 $ 68,400.00 86 13,282 SF REINFORCED GRAVEL PAVING $ 11.00 $ 146,102.00 $ 5.00 $ 66,410.00 87 45,656 SF REINFORCED GRASS PAVING $ 4.00 $ 182,624.00 $ 4.00 $ 182,624.00 88 1,554 SF FLAGSTONE PAVING $ 32.00 $ 49,728.00 $ 6.00 $ 9,324.00 89 1709 LF GRAPESTAKE WOOD FENCING $ 18.00 $ 30,762.00 $ 50.00 $ 85,450.00 SCCP Phase 1 B Bid Summary Page 2 of 9 90 644 LF WOOD FENCING AT ORCHARD $ 45.00 $ 28,980.00 $ 75.00 $ 48,300.00 91 1 EA TEE ARBOR AT POOL ENTRANCE $ 18,200.00 $ 18,200.00 $ 30,000.00 $ 30,000.00 92 1 EA CATERING ARBOR $ 64,300.00 $ 64,300.00 $ 80,000.00 $ 80,000.00 93 1 EA TEE ARBOR AT SNACK BAR $ 16,500.00 $ 16,500.00 $ 15,000.00 $ 15,000.00 94 1 EA BRIDGE ENTRY ARBOR $ 65,500.00 $ 65,500.00 $ 90,000.00 $ 90,000.00 TRASH ENCLOSURE #1 (LARGE 95 1 EA ENCL. WITH ROOF) $ 74,000.00 $ 74,000.00 $ 90,000.00 $ 90,000.00 TRASH ENCLOSURE #2 (SMALL 96 1 EA ENCL. NO ROOF) $ 33,000.00 $ 33,000.00 $ 40,000.00 $ 40,000.00 1 LS GOLF COURSE MAINTENANCE 97 gUILDING (SPECALITY ITEM) $ 225,000.00 $ 225,000.00 $ 490,000.00 $ 490,000.00 98 1 LS KIOSK BUILDING $ 97,000.00 $ 97,000.00 $ 150,000.00 $ 150,000.00 1 LS PROVIDE AND INSTALL PUMP 99 STATION $ 81,200.00 $ 81,200.00 $ 75,000.00 $ 75,000.00 100 1 LS ELECTRICAL WORK $ 251,000.00 $ 251,000.00 $ 190,000.00 $ 190,000.00 1 LS ELECTRICAL WORK (GOLF MAINT. 101 BLDG) $ 31,000.00 $ 31,000.00 $ 20,000.00 $ 20,000.00 1 LS ELECTRICAL WORK (ENTRY KIOSK 102 BLDG) $ 17,000.00 $ 17,000.00 $ 20,000.00 $ 20,000.00 103 1 LS COMMUNICATION WORK $ 77,000.00 $ 77,000.00 $ 20,000.00 $ 20,000.00 1 LS COMMUNICATION WORK (GOLF 104 MAINT. BLDG) $ 55,000.00 $ 55,000.00 $ 40,000.00 $ 40,000.00 1 LS COMMUNICATION WORK (ENTRY 105 KIOSK BLDG) $ 8,600.00 $ 8,600.00 $ 10,000.00 $ 10,000.00 ALLOW ANCES 106 1 AL LANDSCAPE ENHANCEMENTS $200,000.00 $ 200,000.00 $ 200,000.00 $ 200,000.00 107 1 AL GOLF COURSE BALL FENCE $100,000.00 $ 100,000.00 $ 100,000.00 $ 100,000.00 108 1 AL VAROUS BUILDING IMPROVEMENTS $75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 SIGNAGE, PLACARDS AND 109 1 AL AMENITIES $60,000.00 $ 60,000.00 $ 60,000.00 $ 60,000.00 110 1 AL PUBLIC ACCESS CONTROLS $30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 111 1 AL CM SITE EQUIPMENT AND SERVICES $15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 FOOTINGS FOR SEATWALLS & 112 1 AL BRIDGE COLUMNS $15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 TOTAL BID $ 4,161,300.00 **** $ 4,465,917.10 **** Actual Writen on Bid $4,450,917.10 ADD/ALTERNATES BID ALT ERNATE NO. 1: RESIN TRAIL PAVING 1A 108 CY RESIN TRAIL PAVING $ 1,900.00 $ 205,200.00 $ 1,235.00 $ 133,380.00 1B 29 CY RESING PAVEMENT OVERLAY $ 2,200.00 $ 63,800.00 $ 1,200.00 $ 34,800.00 ITEM 1A + 1B, TOTAL BID ALTERNATE 1: $ 269,000.00 $ 168,180.00 BID ALT ERNAT E NO. 2: PHOTOVOLTAIC SYST EM 2 1 LS PHOTOBOLTAIC SYSTEM (GOLF MAINT. BUILDG.) $ 175,000.00 $ 175,000.00 $ 60,000.00 $ 60,000.00 TOTAL ALTERNATES $ 444,000.00 $ 228,180.00 SCCP Phase 1 B Bid Summary Page 3 of 9