Loading...
CC Resolution No. 12-097 Green Building Fees RESOLUTION NO: 12-097 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO ADOPTING USER FEES FOR THE GREEN BUILDING STANDARDS CODE ADOPTED (CHAPTER 16.58 OF THE CUPERTINO MUNICIPAL CODE). WHEREAS, the State of California requires fees charged for services rendered not to exceed the cost of delivering said services; and WHEREAS, a public hearing has been held to review user fees; and WHEREAS, the City Council of the City of Cupertino has established guidelines for setting user fees; and WHEREAS, the City of Cupertino has amended the Green Building Standards Code Adopted Ordinance (Chapter 16.58 of the Cupertino Municipal Code) for incorporation of green building requirements; and WHEREAS, user fees in the form of green building deposits are needed to be established to meet the requirements of the Green Building Standards Code Adopted Ordinance and shall be used solely to advance the purposes of green building. NOW, THEREFORE, BE IT RESOLVED that: 1. Green Building Standards Code Adopted Ordinance user fees are established per amendment in Exhibit A. 2. User fee is effective July 1, 2013. PASSED AND APPROVED at a regular meeting of the City Council of the City of Cupertino this 4th day of September, 2012 by the following vote: Vote Members of the City Council AYES: Santoro, Mahoney. Chang, Sinks, Wong NOES: None ABSTAIN: None ABSENT: None ATTEST: APPROVED: Grace Schmidt Mark Santoro City Clerk, City of Cupertino Mayor, City of Cupertino CITY OF CUPERTINO Exhibit A Resolutions 12-033, 12-097 Fees Effective July 1, 2012,July 1, 2013 Schedule D–Miscellaneous Items Work Item Unit Fee Standard Hourly Rate $133 Accessibility Hardship Exemption 1 hour $174 Acoustical Review Single Family Home/Duplex—New each $600 Single Family Home/Duplex—Addition/Alteration each $666 Multi-Family/Commercial each $266 Additions (R3 Occ) - Plan Check Fees Over the counter-(not hillside-has conventional framing- up to 250 sf _ $266 Minimum 2 hours). Plan Check Fees (not hillside). up to 250 sf $1,014 Plan Check Fees (not hillside). 251-499 sf $1,512 each additional hour 1 hour $133 Additions (R3 Occ) - Inspection Fees Inspection Fees (Not Hillside) up to 250 sf $983 Inspection Fees (Not Hillside) 251-499 sf $1,230 Address Assignment per hour $334 Administrative/Clerical Fee - 1/2 hour flat rate 1/2 hour $42 (covers changes in contractor/architect information and permit extensions) Alternate Materials and Methods of Construction 1 hour $174 Antenna—Telecom Facility Radio each $400 Cellular/Mobile Phone, free-standing each $1,065 Cellular/Mobile Phone, attached to building each $1,065 Arbor/Trellis Awning/Canopy (supported by building) each $334 Balcony Addition each $733 Carport each $600 Certifications Special Inspector Qualifications (initial review) each $266 Special Inspector Qualifications (renewal /update) each $133 Special Inspector Certification Application each $4,526 Materials Testing Lab Certification each $2,795 Chimney each $534 Chimney Repair each $534 Close Existing Openings Interior wall each $467 Exterior wall each $467 Commercial Coach (per unit) each unit $799 Covered Porch each $933 Deck (wood) each $467 Deck Railing each $467 2 Deferred Submittal Roof Trusses up to 1000 sf $666 Additional Roof Truss area each 500 sf $266 Demolition Commercial (up to 3,000 sf) each $534 Commercial (each add'l 3,000 sf) each 3,000 sf $266 Residential (up to 3,000 sf) each $534 Residential (each add'l 3,000 sf) each 3,000 sf $133 Demolition Swimming Pool Residential each $306 Swimming Pool Commercial (up to 3,000 sf) each $534 Swimming Pool Commercial (each add'1 3,000 sf) each 3,000 sf $266 Disabled Access Compliance Inspection per hour $133 Door New door(non structural) each $266 New door(structural shear wall/masonry) each $400 Duplicate/Replacement Job Card each $67 Electric Vehicle Charging Station each $102 Extensions Plan Check Applications (within 180 days of Submittal) 1 hour $174 Permits (within 180 days of Issuance) Start construction, w/o plans 30 min $67 Resume or complete construction, w/o plans 30 min $67 Start construction, w/plans 1 hour $174 Resume or complete construction, w/plans 2 hours $215 Fence Non-masonry, over 6 feet in height up to 100 1.f. $400 Non-masonry, each additional 1001f each 100 l.f. $67 Masonry, over 6 feet in height up to 1001.£ $666 Masonry, each additional 100 if each 100 1.f. $266 Fireplace Masonry each $666 Pre-Fabricated/Metal each $467 Flag pole (over 20 feet in height) each $367 Foundation Repair each $799 Garage/Agricultural Buildings Wood frame up to 1,000 sf each $1,199 Masonry up to 1,000 sf each $1,199 Green Building Deposit- Third Party Certification Process _ _ Single-Family Residential $2/s.f, $1000 max. $2/sf, $20,000 min, Multi-Family Residential $40,000 max. $2/sf, $35,000 min; Non-Residential $75,000 max. Inspections Standard Inspection Hourly Rate per hour $133 Outside of normal business hours, 0-2 hours (minimum charge) up to 2 hrs $399 Each additional hour or portion thereof 1 hour $199 Reinspection fee—per hour 1 hour $133 Progress Inspection per hour $133 Partial Inspection per hour $133 Courtesy Inspection- 2 hour minimum 2 hours $266 Inspections for which no fee is specifically indicated—per hour (minimum charge= 1/2 hour) 1 hour $133 Cancelled inspection w/out advance notice 1 hour $133 Life Safety Report each $799 Lighting pole each $400 each add'l pole each $400 Modular Structures each $799 Modification of Technical Code 1 hour $174 Partition—Commercial, Interior(up to 301.£) up to 30 1.f. $467 Additional partition each 30 1.f. $100 Partition—Residential, Interior(up to 30 l.f.) up to 30 1.f. $467 Additional partition each 30 1.f. $100 Patio Cover/ Sun Room Wood frame up to 300 sf $666 Metal frame up to 300 sf $666 Other frame up to 300 sf $666 Additional patio each 300 sf $534 Enclosed, wood frame up to 300 sf $799 Enclosed, metal frame up to 300 sf $799 Enclosed, other frame up to 300 sf $799 Additional enclosed patio each 300 sf $666 Photovoltaic System Residential each $219 Multi-Family Res/Commercial, up to 8 kilowatts up to 8 kW $532 Multi-Family Res/Commercial, each additional 1 kilowatt each 1 kW $9 Pile Foundation Cast in Place Concrete (first 10 piles) up to 10 $933 Additional Piles (increments of 10) each 10 $799 Driven (steel, pre-stressed concrete) up to 10 $933 Additional Piles (increments of 10) each 10 $799 Product Review per hour $133 Plan Review Standard Plan Review Hourly Rate per hour $133 CALGreen Plan Review (minimum 2 hr charge in addition to Plan Check Fees) per hour $133 1.5 x PC Expedite Plan Review per hour Fee Outside of normal business hours, (minimum 2 hr charge in addition to Plan Check Fees) per hour $199 Remodel—Residential Kitchen up to 300 sf $600 Bath up to 300 sf $600 Other Remodel up to 300 sf $400 Additional remodel each 300 sf $67 4 Other Remodel 1000 sf $4,017 Additional remodel each 300 sf $264 Other Remodel 2500 sf+ $5,337 Additional remodel each 300 sf $191 Re-roof Residential each 100 sf $15 Multi-Family Dwelling each 100 sf $15 Commercial Commercial (first 5,000 sf) each $367 Commercial (each add'l 2,500 sf) each 2,500 sf $167 Retaining Wall (concrete or masonry) Standard (up to 50 lf) up to 50 1.f. $799 Additional retaining wall each 50 1.f. $666 Special Design, 3-10' high (up to 501f) up to 50 1.f. $933 Additional retaining wall each 50 1.f. $799 Special Design, over 10' high (up to 501f) up to 50 l.f. $999 Additional retaining wall each 50 1.f. $865 Gravity/Crib Wall, 0-10' high (up to 50 If) up to 50 1.f. $999 Additional Gravity/Crib Wall each 50 1.f. $865 Gravity/Crib Wall, over 10' high (up to 50 10 up to 50 l.f. $999 Additional Gravity/Crib Wall each 50 l.f. $865 Revisions Commercial New each $799 Tenant Improvement each $799 SFDWL each $799 Addition each $666 Remodel each $666 Sauna—steam each $733 Siding Stone and Brick Veneer(interior or exterior) up to 400 sf $600 All Other up to 400 sf $400 Additional siding each 400 sf $200 Signs Directional each $266 Each additional Directional Sign each $133 Ground/Roof/Projecting Signs each $334 Master Plan Sign Check each $334 Rework of any existing Ground Sign each $334 Other Sign each $334 Reinspection Fee each $67 Wall/Awning Sign,Non-Electric each $266 Wall, Electric each $266 Shed over 120 square feet each $399 Skylight Less than 10 sf each $400 Greater than 10 sf or structural each $733 Solar Water Heating each $102 Stairs—First Flight first flight $334 Each additional flight per flight $200 Storage Racks 0-8' high (up to 1001f) first 1001f $334 each additional 1001f each 1001f $67 over 8' high (up to 1001f) first 100 If $367 each additional 1001f each 1001f $100 Stucco Applications up to 400 sf $467 Additional Stucco Application each 400 sf $34 Supplemental Inspection Fee—If a project requires significantly more inspections than average, the Building Official may charge additional inspection fees First 1/2 hour minimum first 30 min $67 Each Additional hour per hour $133 Overtime Plan Check Fee per hour $199 Supplemental Plan Check Fee (after 2nd review) First 1/2 hour minimum first 30 min $67 Each Additional hour per hour $133 Swimming Pool/Spa Vinyl-lined (up to 800 sf) each $933 Fiberglass each $666 Gunite (up to 800 sf) each $1,464 Additional pool (over 800 sf) each 100 sf $200 Commercial pool (up to 800 sf) each $1,864 Commercial pool (over 800 sf) each $234 Spa or Hot Tub (Pre-fabricated) each $334 Temporary Occupancy Permit - flat rate 2 hours $266 Temporary Structures each $399 Tenant Improvement Preparation each $388 Window or Sliding Glass Door Replacement (first 8 windows) first 8 $400 Replacement (each add'l 8 windows) each 8 $133 New Window(non structural) each $467 New window (structural shear wall/masonry) each $799 Bay Window(structural) each $799 Refunds - Plan Check Fees 100% of Plan 1st review not started (within 3 Business of Submittal) Review Fees Plan review more than 3 Business Days after the Date of Submittal No refund Refunds - Building Permit Fees No inspections and permit is active (not expired) 80% of permit fees No inspections and permit is expired No refund Inspections were provided No refund Work without permit-based on current permit and plan check fees Double fees 6