M-2012-03b OFFICE OF THE CITY CLERK
CITY HALL
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
C U P E RT I N O TELEPHONE: (408) 777-3223• FAX: (408) 777-3366
September 20, 2012
AMENDED
Re: Subject: Modification to the Main Street Cupertino mixed-use development
Enclosed are two further modified resolutions that Council adopted at its September 4 meeting.
Please note that these are additional amendments to the previously sent letter dated September 18.
Sincerely,
Kirsten Squarcia
Acting Deputy City Clerk
cc: Community Development
500 Forbes, LLC
Attn: Kevin Dare
203 Redwood Shores Pkwy #200
Redwood City, CA 94065
RESOLUTION NO. 12-098
�
OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
APPROVING A MODIFICATION (M-2012-03) TO A MASTER USE PERMIT (U-2008-01 AND
M-2011-09), ARCHITECTURAL AND SITE APPROVAL (ASA-2011-24) AND TENTATIVE
MAP (TM-2011-04) FOR A MIXED USE DEVELOPMENT TO ALLOW A HOTEL WITH 180
ROOMS; 130,500 SQUARE FEET OF RETAIL SPACE; 260,000 SQUARE FEET OF OFFICE; A
0.80-ACRE TOWN SQUARE; A 120-UNIT LIVE/WORK RENTAL LOFT APARTMENT
HOUSING COMPLEX WITH AN ATTACHED 9,146 SQUARE FOOT RETAIL
CONDOMINIUM UNIT, AND 216 PARKING SPACES IN THE ATTACHED UNDERGROUND
GARAGE DEDICATED FOR RESIDENTIAL USE; A 5-LEVEL PARKING GARAGE WITH
TWO LEVELS OF UNDERGROUND PARKING; A 0.75 ACRE PARK INCLUSIVE OF THE
PARK AREA AND THE 20-FOOT WIDE LANDSCAPE BUFFER ALONG THE WESTERN
PERIMETER OF THE SITE ADJACENT TO THE METROPOLITAN MIXED-USE
DEVELOPMENT; AND A TOTAL OF 1,769 PARKING SPACES FOR NON-RESIDENTIAL
USES (INCLUDING 42 ON-STREE PARKING SPACES ALONG VALLCO PARKWAY AND
1,727 ON-SITE SPACES) ON AN 18.5 ACRE SITE LOCATED ON THE NORTH SIDE OF
STEVENS CREEK BOULEVARD BETWEEN FINCH AVENUE (INCLUDING BOTH SIDES OF
FINCH AVENUE) AND N. TANTAU AVENUE IDENTIFIED BY APNS 316-20-085, 316-20-078
AND 316-20-079
SECTION I: PROJECT DESCRIPTION
i
Application No.: M-2012-03
Applicant: Kevin Dare
Property Owner: 500 Forbes, LLC
Location: North of Stevens Creek Boulevard between Finch Avenue (including the both sides
of Finch Avenue) and N. Tantau Avenue, south of Vallco Parkway
(APNs 316-20-085, 316-20-078 AND 316-20-079)
SECTION II: FINDINGS
WHEREAS, the City Council of the City of Cupertino received applications for a Modification to a
Master Use Permit, Architectural and Site Approval and Tentative Map, as described in Section I of this
Resolution; and
WHEREAS, the necessary public notices have been given in accordance with the Procedural Ordinance
of the City of Cupertino, and the City Council has held one or more public hearings on this matter; and
WHEREAS, a Second Addendum to the Final Certified 2009 Environmental Impact Report was prepared
to adequately address the environmental review of the proposed applications in accordance with the
California Environmental Quality Act (CEQA); and
WHEREAS, the applicant has met the burden of proof required to support said application; and has
�atisfied the following requirements:
1
Resolution No.12-098
1) The proposed project and use, at the proposed location, will not be detrimental or injurious to
property or improvements in the vicinity, and will not be detrimental to the public health, safety,
general welfare, or convenience; and
2) The proposed project and use will be located and conducted in a manner in accord with the
Cupertino Comprehensive General Plan, the purpose of the Conditional Use Permits Chapter of
the Cupertino Municipal Code, and complies with the California Environmental Quality Act
(CEQA); and
3) The proposed project and use is consistent with the zoning regulations and the South Vallco
Special Center and South Vallco Master Plan; and
4) The proposed project and use is consistent with the Heart of the City Specific Plan.
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this
matter, the application for a Modification to the Master Use Permit, Architectural and Site Approval and
Tentative Map, is hereby approved, subject to the conditions which are enumerated in this Resolution
beginning on Page 2 thereof; and
That the subconclusions upon which the findings and conditions specified in this resolution are based and
contained in the public hearing record concerning Application No. M-2012-03 as set forth in the Minutes
of the City Council Meeting of September 4, 2012, and are incorporated by reference as though fully set
forth herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPT.
1. APPROVED EXHIBITS
The approval is based on Exhibits titled: "Main Street Cupertino, Sand Hill Property Company,
Cupertino, California" site plan dated August 15, 2012 and dated received August 28, 2012,
Mixed Use Loft plans consisting of pages A1.0, A2.1, A2.2, A2.3, A2.4, A2.5, A2.6, and A3.0,
dated received August 28, 2012, and Tentative Map pages TM-1 through TM-8 dated received
August 28, 2012, except as may be amended by the conditions contained in this resolution.
2, PREVIOUS CONDITIONS OF APPROVAL
All previous conditions of approval from Resolution Nos. 12-054, 12-055 and 12-056, for
applications M-2011-09, ASA-2011-24, and TM-2011-04, shall remain in effect unless superseded
by or in conflict with subsequent conditions of approval, including the conditions contained herein
in this resolution.
3. ACCURACY OF THE PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data including but not
limited to property boundary locations, building setbacks, property size, building square footage,
any relevant easements and/or construction records. Any misrepresentation of any property data
may invalidate this approval and may require additional review.
4. DEVELOPMENT APPROVAL AND PERMIT EXPIRATION
Approval of a Modification to the Master Use Permit is granted based upon the site plan identified
dated received August 28, 2012 to allow the construction of a hotel with 180 rooms; up to 130,500
2
Resolution No.12-098 �
square feet of retail space; a 0.80 acre town square; 260,000 square feet of office space; a 120-unit
market-rate rental live/work loft apartment housing complex with an attached 9,146 square foot
retail condominium unit, and 216 parking spaces (1.8 spaces/unit) in the attached underground
garage dedicated for residential use only; a 0.75 acre park inclusive of the park area and the 20-
foot wide landscape buffer along the western perimeter of the site adjacent to the Metropolitan
mixed-use development, a 5-level parking garage with two levels of underground parking; a total
of 1,769 parking spaces for the non-residential uses (based on a credit of 42 on-street parking
spaces along Vallco Parkway and 1,727 on-site spaces) ; and a requirement for the ground floor of
the office buildings and market-rate live/work loft apartment housing complex to accommodate
retail components in each building.
The Modification to the Master Use Permit shall expire within three (3) years from the date of this
approval.
With the exception of the residential units and office square feet, all other uses may be subject to
further refinement based on the final approved tenanting and land use plan, provided that there are
no additional environmental impacts, such as traffic and parking, as determined by the Community
Development Director.
Uses Develo ment A roval
Housin 120 market-rate live/work housin com lex
Hotel 180-room hotel
Retail 130,500 s uare feet
Office 260,000 s uare feet
Parking 1,985 parking spaces per the City's Unshared Parking Requirement in
the Traffic Impact Analysis (TIA) , Second Addendum dated August
2012 as follows (assuming a count of 1.8 spaces/unit for the residential
units in-lieu of the standard City requirement of 2 spaces/unit):
1. Residential—216 parking spaces
2. On-street Vallco Parkway—42 spaces
3. Parking garage and surface parking— 1,727 spaces
Parking in the parking garage for the retail, office and hotel uses shall
be in accordance with Condition No. 18.
Publicly 1.55 acres of town square and park area, inclusive of the .20 acres of
Accessible Open the 20-foot wide landscape buffer along the western perimeter of the
Space (Town site (adjacent to the Metropolitan mixed-use development site)
S uare and Park
5. OFFICE DEVELOPMENT ALLOCATION
The applicant is permitted to retain the 100,000 square feet of unrestricted office allocation
received in 2009 from the N. De Anza Boulevard area in conjunction with the approval for U-
2008-01, and shall additionally receive 160,000 square feet of office allocation from the
unrestricted office allocation from other areas in the City, except from the Vallco Park North area,
to provide the applicant with a total of 260,000 square feet of unrestricted office allocation. The
applicant shall not draw office allocation from the Major Companies pool.
3
Resolution No.12-098
6. HOTEL OPERATIONS
The hotel shall be permitted to operate as a 24-hour late night business operation and shall provide
a minimum 6,500 square foot restaurant and meeting space area on the ground floor of the hotel
along the Town Square. Any additional or revised uses for the hotel will be reviewed at the time
specific business operation information is provided about these uses to determine if they are
permitted and will require a separate Use Permit application.
(Note: This modifies the Condition No. 5 in the approval dated January 20, 2009) to replace the
requirement for a 400-person banquet facility with a 6,500 square foot restaurant and meeting
space.)
7. LIVE/WORK RENTAL LOFT APARTMENT REQUIREMENTS
Prior to issuance of building permits, a covenant, approved by the City Attorney, shall be required
to ensure that the live/work rental loft apartment complex shall not be converted to condominium
units in the future, and shall adhere to the loft-style studio and one-bedroom units per the approved
site and floor plans. The covenant shall contain a provision that it may not be modified without
the express written approval of the City.
8. RETAIL CONDOMINIUM OWNERSHIP REQUIREMENTS (PARCEL 5)
The developer shall construct no more than one retail condominium adjacent to the rental market
rate loft apartments. This retail condominium shall be owned by the same ownership as the rest of
the retail on Retail Parcel 1 and not be sold separately.
9. MAXIMUM PERCENTAGE OF RESTAURANTS
The maximum square footage of food service uses permitted within the retail space of the mixed-
use development shall not be more than 40% of the total retail square footage of 130,500 square
feet (or a maximum of 52,600 square feet of restaurant uses) based upon the approved
development plan dated August 15, 2012 in accordance with the Main Street Cupertino — Revised
Proposed Project Analysis report as Appendix A in the Second Addendum to the Final Certified
2009 EIR prepared by Fehr and Peers. Any future refinements to the restaurant percentage may be
approved by the Director of Community Development if a subsequent parking and traffic analysis
indicates that there is adequate parking for the various mixtures of uses and there are no additional
and/or new significant traffic impacts compared to thresholds studied in the original 2009
Environmental Impact Report and 2012 Addendum.
10. TENTATIVE MAP
Approval of a Tentative Map is granted to subdivide the property from three parcels into six
parcels per Pages TM-1 through TM-8 as follows:
a. Parcel 1 — 11 acres for the retail buildings, park and town square
b. Parcel 2— 1.5 acres for the office building on the corner
c. Parcel 3 — 1.5 acres for the office building along Vallco Parkway
d. Parcel 4 — 1.5 acres for the hotel
e. Parcel 5 -1.5 acres for the live/work loft apartment building with a 9,146 square foot two-unit
retail condominium parcel
4
ResoluHon No.12-098
f. Parcel 6— 1.5 acres for the Common Area Parcel for the benefit of Parcels 1 through 4.
Restrictions and requirements for the shared use of the parking garage to accommodate the retail,
hotel and office uses within the development site shall be included within the CC&Rs including
but not limited to the requirements in Condition No. 18 and conditions related to this and related
project approvals.
11. VACATION OF FINCH AVENUE
The vacation of Finch Avenue is necessary to support this development. The vacation will be
processed according to procedures set by the Streets and Highways Code and the Municipal
Code. A bond will be required prior to issuance of permits for street modifications that will
allow Finch Avenue to be reverted back to a standard City street in the case that the
construction of the project is not completed. The Developer shall install and complete the
street modifications within two (2) years of approval of the Final Map, or such longer period as
may be specifically authorized in writing by the City Engineer. Public access easements, for
both vehicular and pedestrian travel, will be provided across the improved site, to link Stevens
Creek Boulevard with Vallco Parkway, as well as provide public access to the park and the
"town center" plaza area. Failure to complete the improvements within the specified time will
result in the reversion of Finch Avenue to a standard City street and the ownership of the
former Finch Avenue right-of-way shall revert back to the City. The reversion of Finch Avenue
back to a City street shall be subject to approval by the City Attorney and Director of Public
Works.
12. COVENANT OF RECIPROCAL INGRESS/EGRESS EASEMENT
The applicant shall record a deed restriction for necessary reciprocal ingress and egress easements
between each lot created by the new development. The applicant shall also record appropriate
deed restrictions for necessary reciprocal ingress and egress easements between the adjacent
properties to the west, to be implemented at such time that the City can require the same of
adjacent property owners. These reciprocal ingress and egress easements between each lot and
between adjacent properties to the west shall also be recorded on the Final Map. The easement
language shall be reviewed and approved by the City Attorney and the Director of Public Works.
The covenant of easement shall be recorded prior to final map approval. The deed restrictions
shall contain a provision that it may not be modified without the prior express written approval of
the City.
13. PUBLIC PEDESTRIAN EASEMENT
Public access pedestrian easements through the interior sidewalks, pedestrian paths and plazas, the
town square, and park area shall be required and recorded on the final map as noted in the
tentative map plans C0.0 — C6.5. The easement language shall be reviewed and approved by the
City Attorney and Director of Public Works prior to recordation of the easement on the project site
with the final map approval. The final map will include Public Pedestrian Easements, though the
CC&R's will include additional restrictions/guidelines on the usage of the Public Pedestrian
Easements.
14. COVENANTS. CONDITIONS AND RESTRICTIONS
The project CC&Rs shall be reviewed and approved by the City Attorney prior to recordation with
the final map approval. The CC&Rs shall incorporate requirements pertaining to the public access
easements, reciprocal ingress/egress easements, public pedestrian easements, shared parking,
5
Resolution No.12-098
maintenance and operation of common areas including but not limited to public access to the park
and Town Square, and joint use agreements for the town square and park. The CC&Rs shall also
incorporate the Maintenance Agreement addressing the maintenance of the park, town square,
sidewalks, shared driveways by the property owners of each of the lots, and landscaped park strips
along Vallco Parkway, N. Tantau Avenue and Stevens Creek Boulevard adjacent to the subject
site. The conditions of approval for the project shall also be recorded on the properties and
incorporated into the CC&Rs. No changes may be made to the CC&Rs without the City Attorney's
review and approval. The deed restrictions shall contain a provision that it may not be modified
without the prior express written approval of the City.
15. JOINT USE AGREEMENT
Prior to recordation of the final map, the applicant shall submit a joint use agreement between the
City and the applicant to be reviewed by the City Attorney and the Director of Parks and
Recreation, and approved by the City Council, which permits the City to use the town square and
park area for public use for community events or other similar City-approved events or activities,
such as, but not be limited to a farmers' market, holiday activities, and summer events. The joint
use agreement shall be recorded and incorporated by reference into the Covenants, Conditions and
Restrictions (CC&Rs) of the project site. The Joint Use Agreement shall include provisions for
maintenance of the park and town square.
The joint use agreement shall govern the public use, programming, public access and percentage
of time available for the allowable public activities and events for which the town square and park
may be used. The agreement shall also require available publicly identifiable restroom facilities
for public use during normal business hours. No structures will be constructed on the town square
area without the prior approval of the City of Cupertino, other than the retail pad structure(s)
approved in accordance with the Master Use Permit. The programming provisions of the joint use
agreement shall be administered between the applicant and the Parks and Recreation Department
and the document approved by the City Attorney. The Joint Use Agreement shall contain a
provision that it may not be modified without the express written approval of the City.
16. MAINTENANCE AGREEMENT
Applicant shall enter into a Maintenance Agreement that addresses the maintenance of the park,
town square, sidewalks, shared driveways by the property owners of each of the lots, and
landscaped park strips along Vallco Parkway, N. Tantau Avenue and Stevens Creek Boulevard
directly adjacent to the subject project site. The Maintenance Agreement shall be part of the
Covenants, Codes and Restrictions of the project and shall be reviewed and approved by the City
Attorney prior to approval of the final map. The Maintenance Agreement shall contain a provision
that they may not be modified without the express written approval of the City.
17. GROUND FLOOR RETAIL
Prior to issuance of building permits, the applicant shall demonstrate the ground floor retail
functionality for buildings proposed at heights over 45 feet in accordance with the City's General
Plan, to the satisfaction of the Director of Community Development. The ground floor retail shall
be connected to the building and be of substantial and appropriate size to accommodate the
functionality of retail uses. The building frontages of all buildings facing the town square, except
for the hotel shall have ground floor retail. However, the hotel must provide active ground floor
uses facing the town square.
6
Resolution No.12-098
18. PARKING GARAGE ON THE COMMON AREA PARCEL (OWNERSHIP AND RETAIL
PORTION)
The five-level above ground parking garage with two levels of below ground parking shall not be
sold separately from the other parcels in the project. It shall be held as a common area parcel.
Free parking shall be provided in the parking garage and on the surface parking spaces for the
retail and office uses. However, the hotel may charge parking fees for its customers to park in the
parking garage.
The retail incubator buildings on the south side of the parking garage serving Parcels 1 though 4
shall be physically connected to the parking garage in order to satisfy the General Plan height
requirement for buildings over 45 feet and under 60 feet.
19. DISCLOSURE CLAUSE TO THE FUTURE PROPERTY OWNERS
The applicantldeveloper shall inform the future owners through the Covenants, Conditions and
Restrictions (CC&Rs) as well as other documentation of the surrounding projects and that the
development site is under a Cupertino Planned Development zoning. Property purchaser shall
check with the City to determine the specific restrictions under the Planned Development zone and
related permits. The CC&R language incorporating this requirement shall be reviewed and
approved by the City prior to issuance of building permits.
20. BELOW MARKET RATE HOUSING PROGRAM
For residential units, the applicant shall comply with the requirements in the City's Below Market
Rate (BMR) Housing program. For alternatives to these requirements, the applicant may request
the Housing Commission to recommend alternatives to the City Council to meet these
requirements. For dedication of any housing units at below market rates, the applicant shall record
a covenant, which shall be subject to review and approval by the City Attorney, to be recorded
prior to issuance of building permits for the planned senior housing building. BMR fees shall be
paid prior to issuance of building permits.
21. HOUSING MITIGATION FEES
Prior to issuance of building permits, the applicant shall provide the required housing mitigation
fees for the commercial, office and hotel development on the project site.
22. MAXIMUM LENGTH OF HOTEL STAYS
Hotel stays shall be limited to a maximum of 30 days per reservation.
23. 2012 ADDENDUM AND SECOND ADDENDUM TO THE PREVIOUSLY-APPROVED
EIR AND THE MITIGATION MONITORING AND REPORTING PROGRAM
The project shall implement all of the mitigation measures identified in the Mitigation Monitoring
and Reporting Program (MMRP) dated March 2012 as identified in the 2009 Final EIR and as
modified by the 2012 Addendum to the Final EIR as updated on May 4, 2012 and the Second
Addendum to the Final EIR dated August 2012.
24. DEVELOPMENT ALLOCATION
�
Resolurion No.12-098
Use 2009 Master Approved Modification to Approved 2012 Modified Master
Use Permit the Development Plan Use Permit Additional
Allocations Allocations Needed
Granted O tion A 1 -2
Retail Up to 150,000 s Up to 130,500 square feet. No additional allocation is needed
from the Vallco
Park South retail
commercial
allocation
Office 100,000 sf from 260,000 sf 160,000 sf additional from the
the N. De Anza unrestricted office allocation
Boulevard office available per condition no. 4. The
allocation applicant may not use any
allocation from the Major
Com anies office allocation.
Hotel Up to 250 rooms 180 rooms No additional allocation needed
from the
Citywide Hotel
allocation
Housing 160 units from 120 live/work loft apartment No additional allocation needed
the Vallco Park housing units
South residential
allocation
The applicant shall receive an allocation of up to 130,500 square feet of retail commercial square
footage from the Vallco Park South retail commercial allocation area; 120 live/work loft
apartment housing units from the Vallco Park South residential allocation; 180 hotel rooms from
the Citywide Hotel allocation; and 260,000 square feet from the unrestricted office allocation
available citywide (except from the Vallco Park North office allocation area).
25. CONSTRUCTION PROJECT PHASING AND PARK BOND
Prior to issuance of grading and/or building permits, the applicant shall prepare a construction
phasing schedule, and shall demonstrate completion of the project based on the project expiration
date. The construction phasing schedule shall detail critical milestones of the construction.
Critical milestones of the construction shall include but not be limited to the following:
The entire project shall be constructed in one phase (Phase I) and the Modification to the Master
Use Permit shall expire within three (3) years from the date of this approval. Building permits for
all buildings shall be filed and accepted by the City, and the permit shall be used (substantial and
continuous activity has taken place) prior to the expiration of the Modification to the Master Use
Permit.
A performance bond for the park construction (not less than $1.125 million) shall be required in
Phase I. The applicant shall work with staff on the appropriate timing for acceptance of the
performance bond and completion of the park. If the park is not completed to the satisfaction of
the City within three (3) years from the date of approval of the permit, the City shall have the
option of calling in the bond and constructing the park.
8
ResoluHon No.12-098
A. Prior to granting a certificate of occupancy for the first of the hotel or office buildings, the
Town Square, street and sidewalk improvements along Finch Avenue loop and the street and
sidewalk improvements along the interior roadway connecting Finch Avenue loop to the office
parcel shall be completed to the satisfaction of the City.
B. Prior to granting a certificate of occupancy for the second of the hotel or office buildings,
certificates of completion for shell, core, exterior facades and related landscaping and
improvements shall be obtained for at least 50% of the retail approved for the project.
C. Prior to granting a certificate of occupancy for the third of the hotel or office buildings,
certificates of completion for shell, core, exterior facades and related landscaping and
improvements shall be obtained for all the retail buildings.
D. Prior to granting a certificate of occupancy for the live/work loft and retail building, the park
shall be completed to the satisfaction of the City.
26. GRADING AND CONSTRUCTION HOURS
All grading activities shall be limited to the dry season (April 15 to October 15) unless otherwise
approved by the Director of Public Works. Grading hours shall be limited to Monday through
Friday, 7 a.m. to 8 p.m. Grading, street construction, demolition or underground utility work shall
not occur on Saturdays, Sundays and holidays, and during the nighttime period as defined in
Section 10.48.053(b) of the Municipal Code. Construction activities shall be limited to Monday
through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities
are not allowed on holidays. The developer shall be responsible for educating all contractors and
subcontractors of said construction restrictions. Rules and regulation pertaining to all construction
activities and limitations identified in this permit, along with the name and telephone number of a
developer appointed disturbance coordinator, shall be posted in a prominent location at the
entrance to the job site. The applicant shall comply with the above grading and construction hour
requirements unless otherwise indicated in the mitigation measures identified in the Mitigation
Monitoring and Reporting Program (MMRP) dated March 2012 as identified in the 2009 Final
EIR and as modified by the 2012 Addendum to the Final EIR.
27. PARKING
The applicant shall provide the following number of parking spaces based upon the development
plan dated August 15, 2012 (dated received on August 28, 2012), with the following additional
requirements:
(i) 32 additional parking spaces on site (either in the shared parking garage or surface parking)
for a total of 1,727 spaces on-site for the non-residential uses. The applicant shall work
with staff to incorporate the additional spaces on site that may include enlarging the
parking garage by extending the upper story over the alley east of the garage.
(ii) The project would receive credit for 42 on-street parking spaces along Vallco Parkway.
However, the project would be allowed to improve Vallco Parkway with 85 angled parking
spaces and street improvements on the south side of Vallco Parkway along the project
frontage as approved in 2009, until such time in the future that the City decides to modify
the parking and street improvements along Vallco Parkway.
(iii) 12 additional underground parking spaces in the underground parking garage (increasing
parking to 1.8 spaces per unit for a total of 216 parking spaces for the live/work rental loft
apartment). Additionally, the applicant shall provide at least one covered parking space for
each unit at all times.
9
Resolution No.12-098
The applicant shall also comply with the swales and permeable surfaces requirement of the City's
Parking Regulations. Adjustments to the parking plan may be permitted based on the final
approved tenanting and land use program as long as there are no additional parking and traffic
impacts as determined by the Director of Community Development and the parking analyses in
the Second Addendum.
A parking management plan that describes the parking system used by the retail, hotel and office
uses shall be submitted for review and approval by the Community Development Director. The
applicant shall provide an updated plan for any tenant changes that result in changes to the parking
requirements.
28. VALLCO PARKWAY
All on-street parking along Vallco Parkway remains public. The parking spaces along Vallco
Parkway are public parking spaces which shall always be available to the public. These spaces
cannot be limited to use by patrons or tenants of the Main Street Development. The City may
eliminate some or all of this parking at any time at its sole discretion.
29. PARKING CONVERSION FUND
Prior to issuance of any building permit for the project, the applicant shall be required to provide a
"parking conversion" fund that will allow the City to convert the angled parking spaces with one
lane of eastbound traffic and a bike lane approved in association with the project along Vallco
Parkway to parallel parking spaces with two lanes of eastbound traffic and a bike lane, if and when
the City desires. Staff will work with the applicant on the amount to be collected by the applicant.
30. BICYCLE PARKING
The applicant shall provide bicycle parking and bike racks for the proposed project in accordance
with the City's Parking Regulations under Chapter 19.124 of the Cupertino Municipal Code.
31. PARKING LOT LIGHTING
Lighting in the parking lots shall be approved by the Director of Community Development for
compliance with applicable regulations prior to issuance of building permits.
32. BUILDING PERMIT APPROVAL
The Director of Community Development shall review the final building permits for full
conformance with the Master Use Permit approval and the Architectural and Site Approval for
each building prior to issuance of building permits for each building.
33. SIDEWALKS/CROSSWALKS
A. The final sidewalk/street frontage plan shall be required to be reviewed and approved by the
City prior to the final map, and shall match the guidelines of the South Vallco Master Plan and
be consistent with the sidewalk/street frontage plan for the adjacent Rosebowl mixed use
development.
B. The applicant shall provide decorative crosswalks with colored and/or stamped asphalt
pavement across Vallco Parkway, N. Tantau Avenue and Stevens Creek Boulevard. The
decorative pavement materials shall be reviewed and approved by the Director of Community
Development and the Public Works Department, and shall be consistent with the
l0
ResoluHon No. 12-098
recommendation of the traffic analysis prepared by Fehr and Peers in the Transportation
Impact Analysis dated September 5, 2008 on p. 48.
34. SIGNAGE
Signage is not approved with this application. Signage shall conform to the City's Sign Ordinance,
Heart of the City Specific Plan and South Vallco Master Plan. Prior to final occupancy and
approval of any individual signs on site, a detailed master sign program shall be submitted for
review and approval in accordance with the City's Sign Ordinance.
35. ARCHITECTURAL AND SITE APPROVAL
A. The buildings, site development and architecture shall substantially conform to the site plan,
elevations and details as shown in the approved exhibits, unless otherwise noted below. Prior
to issuance of building permits, the applicant shall be required to obtain approval of a separate
Architectural and Site Approval application for each of the buildings by the Design Review
Committee; each Architectural and Site Approval application shall provide a detailed site plan,
full elevations (all four sides), floor plans and any other details as required for Architectural
and Site Approval applications. Building colors and materials shall be reviewed and approved
in conjunction with the Architectural and Site Approval. Minor amendments to approved
Architectural and Site Approvals for buildings and/or the site plan, including minor changes to
the layout of the site plan, building forms and building sizes, may be reviewed and approved
by the Director of Community Development.
B. The applicant shall provide the following additional modifications and enhancements to the
plan prior to issuance of building permits (including recommendations referenced by the
City's Architectural Advisor on February 20, 2012 in Attachment 11 & 16 or as amended by
the Planning Commission): �
l. Town Sc�uare
a. The town square area shall be designed as a "flexible" public space that may be expanded
or shifted by the temporary closure of one or more of the sunounding publicly accessible
streets. Provide additional landscaping in the square.
b. In order to allow for a seamless expansion or shifting of the future pedestrian activities, the
town square area will be developed to be flush with the grade of the surrounding street
system. The Director of Community Development may approve other similar details
deemed to be consistent with the intent of this condition.
c. The applicant shall provide decorative semi-pervious pavements or similar treatments in
the town square and plaza areas to the satisfaction of the Director of Community
Development.
d. Parking on the circular street system shall be delineated by decorative semi-pervious
paving or other similar treatments as deemed to be appropriate by the Director of
Community Development.
e. Final design and landscape of the town square area shall be reviewed and approved by the
Director of Community Development.
f. Temporary closure of any portion of the private drive streets, including methods used to
temporarily close the street(s), will require approval from the Director of Public Works.
2. Office Buildin�s
Architectural enhancements to the building shall be incorporated including the following:
11
Resolution No.12-098
a. Enhance tower entry features with details and design features (particularly the central
tower entry facing Stevens Creek Boulevard) and project the towers out and upward
from the main bulk of the building.
b. Provide prominent architectural design enhancements to emphasize the importance of
this corner as the eastern gateway entry to the City, including identifiable street
frontage public entrances along Stevens Creek Boulevard and N. Tantau Avenue, glass
store fronts and corner site features.
c. Provide horizontal elements to the building design to reduce the verticality of the
building frontages along Stevens Creek Boulevard and N. Tantau Avenue.
d. Provide deep recessed windows.
e. Unify the variety of building forms with more closely related and toned down color
tones.
f. Add ground floor space as an "arcade-like" element along Stevens Creek Boulevard
and around the corners at the easterly Main Street drive entry and a N. Tantau.
3. Hotel
a. The Architectural and Site Approval application for the design of the interior and exterior
of the hotel must return back to the City Council for review and approval.
b. The exterior architectural design of the hotel shall be of the same quality and design
standard as the example provided by the applicant of the Marriott Residence Inn in the
Gaslamp district of San Diego.
c. Provide additional variation in height and wall articulations, such as larger roof eave
overhangs with additional fa�ade depth and architectural detail and variety in roof eave
heights, to minimize the verticality, bulk and box-like shape of the building.
d. Enhance architectural detailing on the building that is in scale with the building.
e. Provide deep recessed windows to provide depth to the building fa�ade.
f. Increase the horizontal elements of the fa�ade.
g. Add patio space (seating) at the corner of Vallco Parkway and Finch Avenue to enliven the
streetscape and entry to the site.
h. Provide additional architectural pedestrian-scale detailing of the ground floor treatment of
the building, including along town square, Vallco Parkway, and the pedestrian area leading
to the garage.
i. Tone down the contrast in exterior colors and provide colors that will complement the
colors used within the development.
j. Provide an outdoor dining terrace along the frontages of the restaurant facing town square.
4. Retail Buildin�s
a. Revise the architectural design of the retail pad building(s) in town square from an agrarian
look to a park pavilion/kiosk style architecture with greater storefront glazing and
sophistication.
b. Provide active storefront pedestrian entries on all retail shops facing Stevens Creek
Boulevard.
c. Provide special design treatments between retail Shops 7 and 8 buildings to lead
pedestrians/customers between the park and the town square.
d. Bring the Shops 4, 5 and 6 buildings closer to the southeast and southwest corners of the
main entryway from Stevens Creek Boulevard.
5. Auto CourtlParking Garage
12
ResoluHon No.12-098
The parking garage shall provide architectural details and provide features along the ground
floor facing Vallco Parkway to promote pedestrian orientation along the street.
6. Street Furniture
The applicant shall provide street furniture and pedestrian amenities along Stevens Creek
Boulevard and Vallco Parkway. Prior to the issuance of building permits for Phase 1 of the
project, the street furniture shall be reviewed and approved by the Design Review Committee.
7. Rental Live/Work Apartment Loft Buildin�
a. Add a distinctive five-story high corner feature that provide a distinctive edge and corner to
the southeast corner of the building above the ground floor retail uses; otherwise, there will
be an awkward four-story high gap at this corner.
b. Provide design articulation on the wall on the southwest corner of the building above the
trash enclosure. The ground floor trash enclosure on this corner facing the town square
needs to be properly screened and provide architecturally enhanced.
c. The hallways appear to be long and narrow and should be enhanced with widened similar to
hotel corridors.
d. Please clarify if the parking garage and the courtyard will be open or be secured.
e. The upper level plans need to clarify if there will be open views to the interior courtyard.
f. Plans should clarify where the windows or natural ventilation for the units will be provided
on upper floor units.
, g. Please clarify if the upper floor corridors open or enclosed along the southern side of the
building.
h. Please provide end cap/corner features to the building. Without these corner end caps, the
length and massing of the building is emphasized.
i. Provide balcony openings for the units to bring residential presence to the street level.
Balconies should be more transparent facing the town square.
j. Enhance the ground floor treatment on the southwest corner(where the trash enclosure is
proposed) to provide a focal point from the north-south walkway.
k. Confirm the height of the building since it may not exceed 60 feet per the City's General
Plan.
1. The top of the buildings need to be enhanced with stronger tops.
m. Windows should be deep set to enhance the elevations.
8. Site Plan and Surface Parkin��Lot
a. Modify the view to the rear of the parking cars from the loop driveway looking south
towards the retail Shop 6 building.
b. Modify the site plan to accurately identify the landscaped areas as green and a different
color for the hardscaped/non-landscaped areas.
c. Provide a single-wide crosswalk between the incubator retail buildings and the retail Pad 3
building in the private roadway.
d. Modify the main driveway entrance to fix the awkward and sharp lane transition from
Stevens Creek Boulevard.
9. Parkin� Gara�e and Attached Retail/Incubator Space
13
Resolution No.12-098
a. Provide left and right turn lanes from the eastern driveway entrance to the parking garage
along Vallco Parkway to avoid back-ups onto the street.
b. Consider an alternate more convenient hotel valet access to the garage
36. GATEWAY ENTRY
The applicant shall be required to construct and install a gateway entry feature on the northwest
corner of Stevens Creek Boulevard and N. Tantau Avenue that will be consistent with the policies
of the General Plan and South Vallco Master Plan. The gateway entry feature shall be a prominent
design that may fulfill the public art requirement and could include a decorative monument feature
that spans over Stevens Creek Boulevard, or vertical structural elements on both sides of Stevens
Creek Boulevard and on the median to announce entry. Also, this corner shall include a
community banner and enhanced pedestrian crossings that may include crosswalk lighting, special
paving materials and/or prominent art or architectural feature announcing the entry to the City,
such as a wrought iron element, subject to review and approval by the City Council.
37. LANDSCAPE PLAN
The applicant shall submit detailed landscape and irrigation plans to be reviewed and approved by
the Director of Community Development prior to issuance of building permits for the building,
portion of development, and/or phase of development for which building permit applications have
been submitted. The landscape plan shall provide the following prior to issuance of building
permits:
A. Water conservation and pesticide reduction measures and requirements in conformance with
Chapter 14.15, Landscape Ordinance, and the pesticide control measures referenced in Chapter
9.18, Stormwater Pollution Prevention and Watershed Protection, of the Cupertino Municipal
Code.
B. A full landscape project submittal per section 14.15.040 of the Landscaping Ordinance. The
Water-Efficient Design Checklist (Appendix A of Chapter 14.15), Landscape and Irrigation
Design Plans, and Water Budget Calculations shall be reviewed and approved to the
satisfaction of the Director of Community Development prior to issuance of building permits.
C. Landscaping along Stevens Creek Boulevard and N. Tantau Avenue in accordance with the
streetscape design requirements of the Heart of the City Specific Plan.
D. Planting of two specimen oak trees flanking the driveway entrances to the development along
Stevens Creek Boulevard as replacements for the removal of the existing dead specimen oak
tree.
E. Existing and Ash trees along Vallco Parkway shall be retained to the maximum possible as
determined by the City Arborist.
38. LANDSCAPE INSTALLATION REPORT
The project is subject to all provisions delineated in the Landscape Ordinance (CMC, Chapter
14.15). A landscape installation audit shall be conducted by a certified landscape professional after
the landscaping and irrigation system have been installed. The findings of the assessment shall be
consolidated into a landscape installation report.
The landscape installation report shall include, but is not limited to: inspection to confirm that the
landscaping and irrigation system are installed as specified in the landscape and irrigation design
plan, system tune-up, system test with distribution uniformity, reporting overspray or run-off that
causes overland flow, and preparation of an irrigation schedule.
14
Resolution No.12-098
The landscape installation report shall include the following statement: "The landscape and
irrigation system have been installed as specified in the landscape and irrigation design plan and
complies with the criteria of the ordina�ce and the permit."
39. LANDSCAPE AND IRRIGATION MAINTENANCE
Per the Landscape Ordinance (CMC, Chapter 14.15), a maintenance schedule shall be established
and submitted to the Director of Community Development or his/her designee, either with the
, landscape application package, with the landscape installation report, or any time before the
landscape installation report is submitted.
a) Schedules should take into account water requirements for the plant establishment period and
water requirements for established landscapes.
b) Maintenance shall include, but not be limited to the following: routine inspection; pressure
testing, adjustment and repair of the irrigation system; aerating and de-thatching turf areas;
replenishing mulch; fertilizing; pruning; replanting of failed plants; weeding; pest control;
and removing obstructions to emission devices.
c) Failed plants shall be replaced with the same or functionally equivalent plants that may be
size-adjusted as appropriate for the stage of growth of the overall installation. Failing plants
shall either be replaced or be revived through appropriate adjustments in water, nutrients, pest
control or other factors as recommended by a landscaping professional.
40. SOIL ANALYSIS REPORT
A soils analysis report shall document the various characteristics of the soil (e.g. texture,
infiltration rate, pH, soluble salt content, percent organic matter, etc) and provide
recommendations for amendments as appropriate to optimize the productivity and water efficiency
of the soil.
The soil analysis report shall be made available to the professionals preparing the landscape and
irrigation design plans in a timely manner either before or during the design process. A copy of the
soils analysis report shall be submitted to the Director of Community Development as part of the
landscape documentation package.
41. LANDSCAPE AND IRRIGATION MAINTENANCE AGREEMENT
Prior to final inspections and final occupancy, the owner(s) of the property shall enter into a
formal written landscape maintenance agreement with the City. The City shall record this
agreement, against the property or properties involved, with the County of Santa Clara Recorder's
Office and it shall be binding on all subsequent owners of land served by the proposed landscape.
The landscape maintenance agreement shall require that modifications and mairitenance activities
not alter the level of water efficiency of the landscape from its original design, unless approved by
the City prior to the commencement of the proposed modification or maintenance activity.
42. TREE REMOVAL
A. The applicant is approved to remove a total of 61 trees and relocate 17 trees on site in
accordance with the City Arborist's report prepared by David Babby and dated April 30, 2008.
Although the applicant is requesting approval to remove these trees in accordance with the
City Arborist's recommendation, the intent is to retain as many of the existing perimeter street
IS
Resolution No.12-098
trees for the remaining life of such trees where they are not considered dead or do not require
immediate removal.
B. The applicant shall be required to replace the Aleppo Pine tree (Tree No. 113) that was
removed in accordance with the City's Protected Trees Ordinance (Chapter 14.18 of the
Cupertino Municipal Code).
C. For any trees that are removed due to hazardous conditions, are considered dead, or die as a
result of relocation, the applicant shall be required to obtain a tree removal permit and replace
these trees in accordance with the City's Protected Trees Ordinance.
D. For any trees that require removal due to construction plan drawing changes and/or
construction activity, the applicant shall obtain a tree removal permit in accordance with the
Protected Trees Ordinance.
E. The Director of Community Development may review and approve further refinements to the
tree removal and planting plan based on the approved final land use program for the center
provided that there are no significant environmental or visual impacts.
43. TREE REPLACEMENTS
Final approval of the required tree replacements shall be reviewed and approved by the Director of
Community Development in accordance with the City's Protected Trees Ordinance. The applicant
may be able to reduce the number of replacement trees on site, if larger size trees are proposed, in
accordance with the tree replacement standards of the ordinance. For any additional trees that are
removed due to hazardous conditions or are considered dead, the applicant shall be required to
obtain a tree removal permit and replace these trees in accordance with the Protected Trees
Ordinance. Species and size of replacement trees shall be reviewed and approved by the
Community Development Director.
44. TREE PROTECTION
As part of the building permit drawings, a tree protection plan shall be prepared by a certified
arborist for the trees to be retained. The applicant shall be required to install tree protection
measures before and during development in accordance with the City Arborist's report dated April
30, 2008, and in accordance with requirements of the Public Works Department for the
preservation of existing street trees. In addition, the following measures shall be added to the
protection plan:
A. For trees to be retained, chain link fencing and other root protection shall be installed azound
the dripline of the tree prior to any project site work.
B. No parking or vehicle parking shall be allowed under root zones, unless using buffers
approved by the project arborist.
C. No trenching within the critical root zone area is allowed. If trenching is needed in the vicinity
of trees to be retained, the City Arborist shall be consulted before any trenching or root cutting
beneath the dripline of the tree.
D. Tree protection conditions shall be posted on the tree protection barriers.
E. Retained trees shall be watered to maintain them in good health.
45. TREE PROTECTION BOND
The applicant shall provide a tree protection bond in an amount determined by the City Arborist to
ensure protection of trees slated for preservation prior to issuance of grading, demolition or
building permits. The bond shall be returned after completion of construction, subject to a letter
from the City Arborist indicating that the trees are in good condition.
16
Resolution No.12-098
46. TREE REPLACEMENT IN-LIEU FEE
The applicant shall pay an in-lieu fee in accordance with the City's Protected Trees Ordinance for
any trees that cannot be replaced on site.
47. HEART OF THE CITY DESIGN GUIDELINES
A. The project shall comply with the Heart of the City Specific Plan development standards and
design guidelines in effect at the time of project approval.
B. If any portions of the buildings on the Master Use Permit site plan do not meet the minimum
setbacks per the Heart of the City Specific Plan, the applicant must either modify the building
setback or obtain approval of an Exception application to the Heart of the City Specific Plan.
48. SOUTH VALLCO MASTER PLAN
The project shall comply with the South Vallco Master Plan. Prior to release of building permits
for Phase 1 of the project, the final boulevard plan along Vallco Parkway shall be reviewed and
approved by the Director of Community Development. The applicant shall make reasonable
efforts to contact adjacent property owners to show improvement plans including, but not limited
to the specific lighting, sidewalk furniture, and landscaping treatments to be consistent with the
vision of the South Vallco Master Plan.
49. CREEK TRAIL IMPROVEMENTS
The applicant shall contribute an amount not to exceed $65,000 to the improvements of a trail
connection along Calabazas Creek from Vallco Parkway to I-280. This contribution shall be used
by the City to administer a creek trail plan and necessary approvals and improvements. If this
fund is not used within five years of the project completion, then it shall be returned to the
applicant.
50. PARK AREA ALONG METROPOLITAN
A approximately 0.55 acre park area shall be maintained along the western property line adjacent
to the Metropolitan mixed-use development. A minimum 20-foot wide landscape buffer shall be
provided along the western property line adjacent to the Metropolitan mixed-use development; the
landscape buffer shall be included in the acreage of the park. The design of the park area shall
include but not be limited to passive recreation apparatuses, such as a tot lot and sitting areas. The
Parks and Recreation Commission shall review the park design and shall refer its recommendation
to the City Council for review and approval. The linear green space park buffer parallel to the
eastern property line of the Metropolitan mixed use development shall be installed prior to
issuance of building occupancy of any building constructed adjacent to this property line.
51. SECURITY PLAN FOR PARKING GARAGE
The applicant shall develop a comprehensive private security plan for the entire development
encompassing patrol hours, manning levels and frequency, closed circuit cameras in the parking
garage, and adequate lighting levels. The plan shall be prepared by the applicant and approved by
the Sherif�s Department prior to final occupancy.
52. PARKING GARAGE NOISE MITIGATION
The parking garage floors shall be treated/coated with materials as deemed appropriate by the City
to lessen the noise impacts of vehicle movements.
53. RESTAURANT ODOR ABATEMENT
17
Resolution No.12-098
All restaurants shall install odor abatement systems to be incorporated into the air handling
systems to reduce the odor impact from the restaurants to the adj acent community. Detailed plans
shall be reviewed and approved by the Community Development Department prior to issuance of
building perrnits.
54. SCREENING
All mechanical and other equipment on the buildings and site shall be screened so they are not
visible frorn public street areas or adjoining developments. Screening materials/colors shall match
building features and materials. The height of the screening shall be taller than the height of the
mechanical equipment that it is designed to screen. The location of equipment and necessary
screening shall be reviewed and approved by the Director of Community Development prior to
issuance of building permits.
55. TRASH AND DELIVERY ACTIVITIES
A detailed refuge and truck delivery plan must be prepared by the applicant. The plan shall specify
locations of trash facilities, refuge pick up schedules and truck delivery schedules and routes. All
trash facilities must be screened and enclosed to the satisfaction of the Public Works Department.
The final plan shall be submitted to the City for review and approval prior to issuance of building
permits. .
All deliveries shall comply with the mitigation measures provided in the Mitigation Monitoring
and Reporting Program prepared by David J. Powers and Associates dated January 2009, except
as may be modified by the 2012 Addendum to the Final Environmental Impact Report (EIR).
56. CONSTRUCTION MANAGEMENT MEETING
Prior to commencement of construction activities, the applicant shall arrange for a pre-
construction meeting with the pertinent departments (Building, Planning, and Public Works) to
review the applicant-prepared construction management plan.
57. CONSTRUCTION MANAGEMENT PLAN
A construction management plan shall be prepared by the applicant and approved by staff prior to
issuance of building permits. During Phase 1 and 2 of the construction, staging of construction and
equipment shall occur as far away from any residential property as possible. The applicant shall
also provide a construction manager hotline phone number for residents of the adjacent
Metropolitan condominium complex to call for construction related activities on the project site.
The hotline number shall also be posted on the project site and at the Metropolitan condominium
complex. Said construction management plan shall also provide the following:
A. Construction Vehicle Access and Routing
B. Construction Equipment Staging Area
C. Dust Control (Best Management Practices)
D. Hours of Operation
E. Street Cleaning Schedule and Program
58. DUST CONTROL
The following construction practices shall be implemented during all phases of construction for
the proposed project to prevent visible dust emissions from leaving the site:
a) Water all active construction areas at least twice daily and more often during windy periods to
prevent visible dust from leaving the site; active areas adjacent to windy periods; active areas
18
Resolution No.12-098
adjacent to existing land uses shall be kept damp at all times, or shall be treated with non-toxic
stabilizers or dust palliatives.
b) Cover all trucks hauling soil, sand and other loose materials or require all trucks to maintain at
least 2 feet of freeboard;
c) Pave, apply water at least three times daily, or apply (non-toxic) soil stabilizers on all unpaved
access roads, parking areas and staging areas at construction site.
d) Sweep streets daily, or more often if necessary (with water sweepers) if visible soil material is
carried onto adjacent public streets.
e) The applicant shall incorporate the City's construction best management practices into the
building permit plan set.
fl The applicant shall comply with the above dust control requirements unless otherwise
indicated in the mitigation measures identified in the Mitigation Monitoring and Reporting
Program (MMRP) dated March 2012 as identified in the 2009 Final EIR and as modified by
the 2012 Addendum to the Final EIR.
59. NOISE MITIGATION
The project and retail operations shall comply with the City's Community Noise Control
Ordinance (Chapter 10.48 of the CMC), unless otherwise indicated in the mitigation measures
identified in the Mitigation Monitoring and Reporting Program (MMRP) dated March 2012 as
identified in the 2009 Final EIR and as modified by the 2012 Addendum to the Final EIR. In
addition, the following mitigation measures shall be taken in order to reduce noise event impacts
to nearby receptor areas:
a) Delivery trucks shall be turned off while unloading products at the loading dock.
b) Construction equipment shall be have quiet design features, be well-maintained, and have a
high quality muffler system.
c) Temporary plywood enclosures shall be erected around stationary equipment that produces
excessive noise at nearby receptors.
d) Unnecessary idling of machines when not in use shall be prohibited.
e) Good maintenance and lubrication procedures shall be used to reduce operating noise.
60. GREEN BUILDING
The applicant shall obtain LEED certification designation for the hotel, office and loft residential
rental housing buildings in accordance with the U.S. Green Building Council standards and the
City's Green Building policies. The applicant shall also design the athletic club (if developed) and
retail buildings to LEED certification standards, but will not be required to certify these buildings
as LEED certified. The applicant shall also provide solar hot water heating for any pools provided
on the project site.
61. TRANSPORTATION DEMAND MANAGEMENT
The applicant shall commit to implementing a transportation demand management (TDM) plan
incorporating solutions as indicated in the mitigation measures identified in the Mitigation
Monitoring and Reporting Program (MMRP) dated March 2012 as identified in the 2009 Final
EIR and as modified by the 2012 Addendum to the Final EIR, that may include parking cash-out
and eco passes for employees, valet for customers and off-site parking options. The TDM plan
including the projected funding shall be reviewed and approved by the Director of Community
Development Director prior to issuance of building permits.
19
Resolution No.12-098
62. UTILITY STRUCTURES
All new utility structures shall be located underground or screened from public view to the
satisfaction of the Director of Community Development and Public Works.
63. DEMOLITION REQUIREMENTS
All demolished building and site materials shall be recycled to the maximum extent feasible
subject to the Building Official and shall meet the mandatory requirements of the Cal Green
Building Code. The applicant shall provide evidence that materials will be recycled prior to
issuance of final demolition permits.
64. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with regard to the
proposed project for additional conditions and requirements. Any misrepresentation of any
submitted data may invalidate an approval by the Community Development Department.
65. NOTICE OF FEES DEDICATIONS RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees, dedication
requirements, reservation requirements, and other exactions. Pursuant to Government Code
Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of
such fees, and a description of the dedications, reservations, and other exactions. You are hereby
further notified that the 90-day approval period in which you may protest these fees, dedications,
reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If
you fail to file a protest within this 90-day period complying with all of the requirements of
Section 66020, you will be legally barred from later challenging such exactions.
66. PUBLIC ART
The applicant shall provide public art in accordance with General Plan policy 2- 66. Public art
shall be installed on the project site prior to final occupancy of the last building completed in the
first phase. The public art shall be valued at a minimum of one-quarter percent (1/4%) of the total
project budget, not to exceed $100,000. The applicant shall submit a public art plan to be reviewed
by the Fine Arts Commission prior to installation of the public art.
67. CIRCULATION PLAN
Prior to issuance of building permits, the applicant shall provide an auto, bike and pedestrian
circulation plan.
68. SHERIFF SUBSTATION
The applicant shall add a Sheriff's substation on site. The applicant shall work with staff on the
appropriate location and size of the substation.
SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPT.
These conditions are not intended to be exhaustive. Additional conditions may need to be addressed,
prior to issuance of a building permit, based on potential modifications to the site's usage and/or layout.
69. STREET WIDENING
Public street widening and dedications shall be provided in accordance with City Standards and
specifications and as required by the City Engineer.
20
Resolution No.12-098
70. CURB AND GUTTER IMPROVEMENTS
Curbs and gutters, sidewalks and related structures shall be installed in accordance with grades
and standards as specified by the City Engineer.
71. STREET LIGHTING INSTALLATION
Street lighting shall be installed and shall be as approved by the City Engineer. Lighting fixtures
shall be positioned so as to preclude glare and other forms of visual interference to adjoining
properties, and shall be no higher than the maximum height permitted by the zone in which the
site is located.
72. FIRE HYDRANT
Fire hydrants shall be located as required by the City and Santa Clara County Fire Department as
needed.
73. GRADING
Grading shall be as approved and required by the City Engineer in accordance with Chapter 16.08
of the Cupertino Municipal Code. 401 Certifications and 404 permits maybe required. Please
contact Army Corp of Engineers and/or Regional Water Quality Control Board as appropriate.
74. DRAINAGE
Drainage shall be provided to the satisfaction of the City Engineer. Hydrology and pre- and post-
development hydraulic calculations must be provided to indicate whether additional storm water
control measures are to be constructed or renovated. The storm drain system may include, but is
not limited to, subsurface storage of peak stormwater flows (as needed), low impact development
facilities, or other approved means, to reduce the amount of runoff from the site and to improve
storm water quality. The storm drain system shall be designed to detain water on-site (e.g., via
buried pipes or storage structures) as necessary to avoid an increase of one percent flood water
surface elevation of the culvert to the satisfaction of the City Engineer. Any storm water
overflows or surface sheeting should be directed away from neighboring private properties and to
the public right of way as much as reasonably possible. Hydro-modification measures may be
required as directed by the Municipal Regional Permit.
75. UNDERGROUND UTILITIES
The developer shall comply with the requirements of the Underground Utilities Ordinance No.
331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate
with affected utility providers for installation of underground utility devices. The developer shall
submit detailed plans showing utility underground provisions. Said plans shall be subject to prior
approval of the affected Utility provider and the City Engineer.
76. IMPROVEMENT AGREEMENT
The project developer shall enter into a development agreement with the City of Cupertino
providing for payment of fees, including but not limited to checking and inspection fees, storm
drain fees, park dedication fees and fees for under grounding of utilities. Said agreement shall be
executed prior to issuance of construction permits
Fees:
a. Checking & Inspection Fees: 6% of Off-Site Improvement Cost or
$4,1 O 1.00 minimum
21
Resolution No.12-098
b. Grading Permit: 6% of Site Improvement Cost or
$2,387.00 minimum
c. Development Maintenance Deposit: $ 3,000.00
d. Storm Drainage Fee: $ TBD
e. Power Cost: **
£ Map Checking Fees: $8,052.00
g. Park Fees: $ per Municipal Code
(or an equivalent park land dedication)
h. Street Tree By Developer
** Based on the latest effective PG&E rate schedule approved by the PUC
Bonds:
Faithful Performance Bond: 100% of Off-site and On-site Improvements
Labor & Material Bond: 100% of Off-site and On-site Improvement
On-site Grading Bond: 100% of site improvements.
-The fees described above are imposed based upon the current fee schedule adopted by the City
Council. However, the fees imposed herein may be modified at the time of recordation of a final
map or issuance of a building permit in the event of said change or changes, the fees changed at
that time will reflect the then current fee schedule.
77. TRANSFORMERS
Electrical transformers, telephone vaults and similar above ground equipment enclosures shall be
screened with fencing and landscaping or located underground such that said equipment is not
visible from public street areas. The transformer shall not be located in the front or side building
setback area.
78. BEST MANAGEMENT PRACTICES
Utilize Best Management Practices (BMPs), as required by the State Water Resources Control
Board, for construction activity, which disturbs soil. BMP plans shall be included in grading and
street improvement plans.
79. DEDICATION OF WATERLINES
The developer shall dedicate to the City all waterlines and appurtenances installed to City
Standards and shall reach an agreement with California Water Services Company for water service
to the subject development.
S0. NPDES CONSTRUCTION GENERAL PERMIT
The developer must obtain a Notice of Intent (NOI) from the State Water Resources Control
Board, which encompasses preparation of a Storm Water Pollution Prevention Plan (SWPPP), use
of construction Best Management Practices (BMPs) to control storm water runoff quality, and
BMP inspection and maintenance.
81. C.3 REQUIREMENTS
The developer shall reserve a minimum of 4% of developable surface area for the placement of
low impact development measures, for storm water treatment, on the tentative map, unless an
22
Resolution No.12-098
alternative storm water treatment plan, that satisfies C.3 requirements, is approved by the City
Engineer.
The developer must include the use and maintenance of site design, source control and storm
water treatment Best Management Practices (BMPs), which must be designed per approved
numeric sizing criteria. A Storm Water Management Plan, Storm Water Facilities Easement
Agreement, Storm Water Facilities Operation and Maintenance Agreement, and certification of
ongoing operation and maintenance of treatment BMPs are each required.
All storm water management plans are required to obtain certification from a City approved third
party reviewer.
82. FULL TRASH CAPTURE SYSTEM
The developer will be responsible for installing a full trash capture system/device to capture trash
from the onsite storm drain before the storm water reaches the City owned storm drain system. A
full capture system or device is a single device or series of devices that traps all particles retained
by a 5 mm mesh screen and has a design treatment capacity of not less than the peak flow rate Q
resulting from a one-year, one-hour storm in the sub-drainage area (see the Municipal Regional
Permit section C.10 for further information/requirements).
83. EROSION CONTROL PLAN
The developer must provide an approved erosion control plan by a Registered Civil Engineer.
This plan should include all erosion control measures used to retain materials on site. Erosion
control notes shall be stated on the plans.
84. WORK SCHEDULE
Every 6 months, the developer shall submit a work schedule to the City to show the timetable for
all grading/erosion control work in conjunction with this project.
85. TRAFFIC SIGNAL IMPROVEMENTS
The developer shall agree to fund up to $300,000 for the purpose of installing a traffic signal at
Finch Avenue and Vallco Parkway as well as for making traffic signal improvements at the
Stevens Creek Boulevard and Tantau Ave intersection. The developer shall also submit a bond for
this purpose which will be released 5 years from the date of project occupancy.
86. TRAFFIC MITIGATION AT WOLFE ROAD AND VALLCO PARKWAY
The developer shall mitigate for traffic impacts at Vallco Parkway and Wolfe Road by
implementing one of the options stated in the Environmental Impact Report for Main Street
Cupertino per the approval of the City Engineer.
87. TRAFFIC MITIGATION AT HOMESTEAD ROAD & LAWRENCE EXPRESSWAY
The developer shall agree to submit their fair-share cost of up to $400,000 to improve Homestead
Road at Lawrence Expressway according to the direction of the City Engineer. The fair-share
contribution to the County will be dependent on the amount of traffic generated by the approved
Plan. In the event that a Plan is approved that has reduced traffic impacts, the same formula would
be used (calculating the percentage of traffic the project is adding to total growth between
background and cumulative conditions). The cost shall be submitted to the County of Santa Clara
in the form of a bond or cash deposit prior to the City issuing building permits, with the proviso
23
Resolution No.12-098
that the funds be committed to this specific improvement in accordance of section 66000 et. seq.
of the California Government Code.
88. PUBLIC ACCESS EASEMENT
The Developer shall provide, to the satisfaction of the City Engineer, a public access easement
across the site, over the park and over the town center. The easement, including for vehicular and
pedestrian travel, shall link Stevens Creek Boulevard with Vallco Parkway, the park and the town
center. Public access easements shall include access for both vehicular and pedestrian travel, and
shall be shown and recorded on the Final Map. All of the internal roadways shall have a public
driving and parking access easement over them. Public access areas may not be closed off without
the consent and approval of the Public Works Department, and shall be governed by the Joint Use
Agreement recorded within the project's Covenants, Conditions and Restrictions (CC&R's). The
public access easement shall be subject to approval by the City Attorney. The public access
easement shall contain a provision that they may not be modified without the express written
approval of the City.
89. PEDESTRIAN IMPROVEMENTS
The developer shall provide pedestrian improvements along the property frontage, including
crosswalk improvements at adjoining intersections. Final crosswalk improvement plan shall be
reviewed and approved by the City Engineer.
90. BUS STOP LOCATION
The developer shall improve bus stops on Stevens Creek Boulevard along the project frontage and
the immediate vicinity of the project site to the satisfaction of the City Engineer; this may include
consistent shelters for the bus stops, but will not include duck outs or relocation of the bus stops.
91. TRAFFIC CONTROL PLAN
The developer must submit a traffic control plan by a Registered Traffic Engineer to be approved
by the City. The plan shall include a temporary traffic control plan for work in the right of way as
well as a routing plan for all vehicles used during construction. All traffic control signs must be
reviewed and approved by the City prior to commencement of work. The City has adopted
Manual on Uniform Traffic Control Devices (MUTCD) standards for all signage and striping
work throughout the City.
92. TRAFFIC SIGNS
Traffic control signs shall be placed at locations specified by the City.
93. TRAFFIC CALMING
The developer shall agree to fund up to $100,000 for the purpose of mitigating traffic impacts in
the adjacent neighborhoods resulting from the project for a period of 5 years following project
occupancy. The developer shall submit a bond for this purpose which will be released 5 years
from the date of project occupancy.
94. EMERGENCY VEHICLE PREEMPTION FUND
The Developer is required to pay $15,000.00 to fund three Emergency Vehicle Preemption devices
for traffic signals at the adjacent intersections.
95. BICYCLE PARKING
24
Resolution No.12-098
The developer shall provide bicycle parking consistent with the City's requirements to the
satisfaction of the City Engineer.
96. OPERATIONS & MAINTENANCE AGREEMENT
The developer shall enter into an Operations & Maintenance Agreement with the City prior to
final occupancy. The Agreement shall include the operation and maintenance for non-standard
appurtenances in the public road right-of-way that may include, but is not limited to, sidewalk,
pavers, and street lights.
97. TRASH ENCLOSURES
The trash enclosure plan must be designed to the satisfaction of the Environmental Programs
Manager. Clearance by the Public Works Department is needed prior to obtaining a building
permit.
98. REFUSE TRUCK ACCESS .
The developer must obtain clearance from the Environmental Programs Manager in regards to
refuse truck access for the proposed development.
99. STREET TREES
Street trees shall be planted within the Public Right of Way and shall be of a type approved by the
City in accordance with Ordinance No. 125.
100. FIRE PROTECTION
Fire sprinklers shall be installed in any new construction to the approval of the City.
101. SANTA CLARA WATER DISTRICT CLEARANCE
Provide Santa Clara water district approval before recordation of the final map. The developer
shall pay for and obtain Water District permit for activities or modifications within the District
easement or fee right of way or affecting District facilities.
102. STREAMSIDE PERMIT
Prior to issuance of a building permit, the developer shall provide plans and information that
satisfies the requirements of the Stream Side Permit as set forth by the Santa Clara Valley Water
Resources Protection Collaborative. These items include, but are not limited to, topographic
survey, specific measures to protect streams and/or waterbodies from water quality impacts,
coordination with all interested jurisdictional agencies, etc.
103. SANITARY DISTRICT
A letter of clearance for the project shall be obtained from the Cupertino Sanitary District prior
to issuance of building permits.
104. SANTA CLARA COUNTY FIRE DEPARTMENT
A letter of clearance for the project shall be obtained from the Santa Clara County Fire
Department prior to issuance of building permits.
105. UTILITY EASEMENTS
Clearance approvals from the agencies with easements on the property (including PG&E,
PacBell, and California Water Company, andlor equivalent agencies) will be required prior to
issuance of building permits.
25
Resolution No.12-098
106. CALIFORNIA WATER SERVICE COMPANY CLEARANCE
Provide California Water Service Company approval before recordation of the final map.
107.CALABAZAS CREEK INSPECTION
The developer agrees to have all bays of the Calabazas Creek Culvert, from Stevens Creek
through Vallco Parkway, inspected and videotaped prior to start of any construction on site. An
inspection report and 2 copies of the inspection video are to be provided to the City prior to
issuance of a permit to begin any work on site. The developer is responsible for coordinating with
and obtaining and permits from the Santa Clara Valley Water District prior to beginning
inspection operations.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 4`h day
of September 2012, by the following vote:
Vote Members of the Citv Council
AYES: Santoro, Mahoney, Chang, Sinks, Wong
NOES: None
ABSENT: None
ABSTAIN: None
ATTEST: APPROVED:
/-�I j�./ '� ;� /'� � ��f ��'li%i���
�� f�x� ,��.. _-i ✓ �..
Grace Schmidt Mark Santoro
City Clerk Mayor, City of Cupertino
r
26
� �.
OFFICE OF THE CITY CLERK
CITY HALL
10300 TORRE AVENUE•CUPERTINO, CA 95014-3255
C U P E RT 1 N O TELEPHONE: (408)777-3223• FAX: (408)777-3366
To: Planning Department
From: Kirsten Squarcia
Subject: 14. Subject: Modification to the Main Street Cupertino mixed-use development
Recommended Action: Staff recommends approval o£
1. Adopt Resolution No 12-098 approving Modification (M-2012-03) to the
previously-approved Master Use Permit (U-2008-01 and M-2011-09) and
Architectural and Site Approval (ASA-2011-24) for a mixed-use project consisting
of 130,500 square feet of retail, a 180-room hotel, 260,000 square feet of office and
a 120-unit market-rate live/work rental loft residential development, including the
modifications to the parking garage and retail
2. Adopt Resolution No. 12-099 approving Architectural and Site Approval (ASA-
2012-10) for the conceptual approval of 120 market-rate rental residential live/work
rental loft units and modifications to the parking garage and retail
3. Adopt Resolution No. 12-100 approving Modification to the previously-approved
Tentative Map (TM-2012-04) to subdivide five (5) parcels into six (6) parcels
including one lot for the retail, park and town square; one lot for each of the two
office buildings; one lot for the hotel; one lot for the market-rate rental residential
units; and one common area parcel for the parking garage to serve the retail, hotel
and office buildings
4. Second Addendum to the Final Certified 2009 Envirornnental Impact Report EA-
2012-OS
Date: September 18, 2012
-----------------------------------------------------------
-----------------------------------------------------------
On September 4 the City Council made the following action:
1. Adopted Resolution No. 12-098 approving the Modification (M-2012-03) to the previously-
approved Master Use Permit (U-2008-01 and M-2011-09) and Architectural and Site
Approval (ASA-2011-24) for a mixed-use project consisting of 130,500 square feet of retail,
a 180-room hotel, a five-level parking garage with two levels of underground parking, a
total of 1,984 parking spaces (including 85 on-street parking spaces along Vallco Parkway),
260,000 square feet of office, a 120-unit market-rate live/work rental loft residential
development with a 9,146 square foot retail condominium unit, modifications to the parking
garage and retail square footages and footprints, and the following additional conditions:
a. Remove the age-restriction on the housing component of the project, and approve as a
live/work loft rental apartment complex.
b. Include the following condition for the apartment complex: Require that the live/work
loft apartment complex remain as rental units and may not be converted to
condominium units.
c. Require the live/work loft apartment complex to provide parking at 1.8 parking
spaces/unit(add 12 additional parking spaces in the residential underground garage) for
a total of 216 parking spaces.
d. The applicant shall also provide an additiona132 parking spaces on site (either in the
shared parking garage or surface parking). This balance is based upon the difference
between the City's unshared parking rate required for the hotel, retail and office
buildings (1,769 spaces), credit of 42 on-street parking spaces along Vallco Parkway,
and the applicant's proposal for the hotel, retail and office parking(1,695 spaces).
(1,769—42— 1,695 = 32 spaces). The applicant shall work with staff to incorporate the
additional spaces on site that may include enlarging the parking garage by extending the
upper story over alley to the east of the garage.
e. Retain the proposed 85 angled parking spaces and street improvements along the south
side of Vallco Parkway along the project frontage as approved in 2009 in association
with this project, until such time in the future the City decides to modify the parking and
street improvements along Vallco Parkway.
f. Include the following condition regarding the spaces on Vallco Parkway: All on-street
parking along Vallco Parkway remains public: The parking spaces along Vallco
Parkway are public parking spaces which shall always be available to the public. These
spaces cannot be limited to use by patrons or tenants of the Main Street Development.
The City may eliminate some or all of this parking at any time at its sole discretion.
g. Include the following condition regarding a"Parking Conversion" Fund: Prior to
issuance of any building permit for the project, require that the applicant provide a
"Parking Conversion" fund that will allow the City to convert the angled parking spaces
with one lane of eastbound traffic and a bike lane approved in association with the
project along Vallco Parkway to parallel parking spaces with two lanes of eastbound
traffic and a bike lane, if and when the City desires. Staff will work with the applicant
on the amount to be collected by the applicant.
h. Require the applicant to work with the applicant on a auto, bike and pedestrian
circulation plan.
i. The applicant shall provide free parking in the parking garage and on the surface
parking spaces for the retail and office uses. However, the hotel may charge parking fees
for its customers to park in the parking garage.
j. Include the following condition regarding the inspection of Calabazas Creek: The
developer agrees to have all bays of the Calabazas Creek Culvert, from Stevens Creek
through Vallco Parkway, inspected and videotaped prior to start of any construction on
site. An inspection report and 2 copies of the inspection video are to be provided to the
City prior to issuance of a permit to begin any work on site. The developer is
responsible for coordinating with and obtaining and permits from the Santa Clara Valley
Water District prior to beginning inspection operations.
k. The applicant shall add a Sheriff s substation on site to be incorporated into the parking
garage. The applicant shall work with staff on the appropriate location and size of the
substation.
I. The Phasing condition shall be modified to: 1. Clarify that the permits for the entire
project shall be valid for three years; 2. The project will be constructed in one phase;
and 2. Clarify in Condition No. 25C that certificates of completion for the shell, core,
exterior facades and related landscaping and improvements shall be obtained for all
retail buildings (remove reference to "east of Finch Avenue) prior to the certificate of
occupancy of the hotel or office buildings.
m. The 0.75 acre park is inclusive of the park area and the 20-foot wide landscape buffer
along the western perimeter of the site adjacent to the Metropolitan mixed-use
development.
2. Adopted Resolution No. 12-099 approving the Architectural and Site Approval (ASA-2012-
10) application for the conceptual approval of the 120-unit market-rate rental residential
live/work rental building with a 9,146 square foot retail condominium unit attached to the
residential building, and modifications to the parking garage and retail building footprints
and sizes.
3. Adopted Resolution No. 12-100 approving the Modification to the Tentative Map (TM-
2012-04) to subdivide the five (5)parcels into six (6)parcels including one lot for the retail,
park and town square, one parcel for each of the two office buildings, one lot for the hotel,
one lot for the market-rate rental residential building with 9,146 square foot retail
condominium unit, and one common area parcel for the parking garage to serve the retail,
hotel and office buildings.
4. Approved the Second Addendum to the Final Certified 2009 EIR and 2012 Addendum.
COUrit of Santa Clara �ouN,. Santa Clara County �.�rk—Recorder's Office
y � ��I�� � State of California
Off'ice of the County Clerk-Recorder ,�'r�� '�° Document No.: 17fi36
Business Division � � =--� Number of Pages: �
s ' �;� e' Filed and Posied On: 911U12Q12
County Government Center ��L�.A C�,P`� Through: 1U11012012
70 West Hedding Street, E. Wing, 1S` Floor aL 1��'1�1' CRO Order Number:
San Jose,California 95110 (408)299-5688 Fee Total: 2,969.00
CEQA DOCUMENT DECLARATION REGINA ALCOMENDRAS, Counry Clerk—Recorder
ENVIRONMENTAL FILING FEE RECEIPT bY vaneSSa �CtIZ, Document Examiner, �
PLEASE COMPLETE THE FOLLOWING:
1. LEAD AGENCY: City of Cupertino
2. PROJECT TITLE: EA-2012-05(M-2012-03,ASA-212-10,TM-2012-04)
3. APPLICANT NAME: Kevin Dare (500 Forbes, LLC) PHONE: 408-777-3308
4. APPLICANT ADDRESS: 3 vacant lots on Stevens Creek Blvd (between Wolfe Rd and Tantau Ave)Cupertino, Ca. 95014
5. PROJECT APPLICANT IS A: ❑Local Public Agency ❑School District ❑Other Special District ❑State Agency �Private Entity
6. NOTICE TO BE POSTED FOR 30 DAYS.
7.CLASSIFICATION OF ENVIRONMENTAL DOCUMENT
a.PROJECTS THAT ARE SUBJECT TO DFG FEES
p 1.ENVIRO NMENTAL IMPACT REPORT(PUBLIC RESOURCES CODE§21152) $2,919.00 $ 2,919.00
❑ 2.NEGATIVE DECLARATION (PUBLIC RESOURCES CODE§21080(C) $2,101.50 $ 0.00
❑ 3. APPUCATION FEE WATER DIVERSION�sTnTe WATER RESOURCES CONTROL BOARD ONLY) .p �SO.00 .p O.00
O 4. PROJECTS SUBJECT TO CERTIFIED REGULATORY PROGRAMS $ 992.50 $ 0.00
p 5. COUNTY ADMINISTRATIVE FEE(REQUIRED FOR a-1 THROUGH a-4 ABOVE) $ 50.00 $ 50.00
Fish&Game Code§711.4(e)
b. PROJECTS THAT ARE EXEMPT FROM DFG FEES
❑ 1. NOTICE OF EXEMPTION($50.00 COUNTY ADMINISTRATIVE FEE REQUIRED) $ 50.00 $ 0.00
❑ 2. A COMPLETED"CEQA FILING FEE NO EFFECT DETERMINATION FORM"FROM THE
DEPARTMENT OF FISH 8�GAME,DOCUMENTING THE DFG'S DETERMINATION THAT THE PROJECT
WILL HAVE NO EFFECT ON FISH,WILDLIFE AND HABITAT,OR AN OFFICIAL,DATED RECEIPT/
PROOF OF PAYMENT SHOWING PREVIOUS PAYMENT OF THE DFG FILING FEE FOR THE*SAME
PROJECT IS ATTACHED ($50.00 COUNTY ADMINISTRATIVE FEE REQUIRED)
DOCUMENT TYPE: 0 ENVIRONMENTAL IMPACT REPORT ❑ NEGATIVE DECLARATION $ 50.00 $ 0.00
c. NOTICES THAT ARE NOT SUBJECT TO DFG FEES OR COUNTY ADMINISTRATIVE FEES
❑ NOTICE OF PREPARATION ❑ NOTICE OF INTENT NO FEE $ NO FEE
8. OTHER: FEE(IF APPLICABLE): $
9. TOTAL RECEIVED........................................................................................................................................................ $ 2,969.00
*NOTE:"SAME PROJECT'MEANS NO CHANGES. IF THE DOCUMENT SUBMITTED IS NOT THE SAME(OTHER THAN DATES),A"NO EFFECT
DETERMINATION"LETTER FROM THE DEPARTMENT OF FISH AND GAME FOR THE SUBSEQUENT FILING OR THE APPROPRIATE FEES ARE
REQUIRED.
THIS FORM MUST BE COMPLETED AND ATTACHED TO THE FRONT OF ALL CEQA DOCUMENTS LISTED ABOVE(INCLUD/NG COP/ES)
SUBMITTED FOR FILING. WE WILL NEED AN ORIGINAL(WET SIGNATURE)AND THREE COPIES. (YOUR ORIGINAL WILL BE RETURNED TO
YOU AT THE TIME OF F/LING.)
CHECKS FOR ALL FEES SHOULD BE MADE PAYABLE TO: SANTA CLARA COUNTY CLERK-RECORDER
PLEASE NOTE: FEES ARE ANNUA�LY ADJUSTED(Fish&Game Code§711.4(b); PLEASE CHECK WITH THIS OFFICE AND THE DEPARTMENT
OF FISH AND GAME FOR THE LATEST FEE INFORMATION.
'...NO PROJECT SHALL BE OPERATIVE, VESTED, OR FINAL,NOR SHALL LOCAL GOVERNMENT PERMITS FOR THE PROJECT BE VALID,
UNTIL THE FILING FEES REQU/RED PURSUANT TO THIS SECTIONARE PA/D." Fish&Game Code§711.4(c)(3)
13-2012 (FEES EFFECTIVE 01-Ot-2012)
COMMUNITY DEVELOPMENT DEPARTMENT
CITY HALL
10300 TORRE AVENUE•CUPERTINO,CA 95014-3255
(408)777-3308•FAX(408)777-3333
CUPERTINO
September 5, 2012
NOTICE OF DETERMINATION
EA-2012-05
Application: M-2012-03, ASA-2012-10,TM-2012-04
Applicant: Kevin Dare (500 Forbes, LLC)
Project Title: Main Street Cupertino Project
Project Location: 31ots on Stevens Creek Blvd between Wolfe Rd and Tantau Ave, Cupertino,CA 95014
State Clearinghouse Identification Number: 2008082058
In 2009, the Cupertino City Council certified the Final Environmental Impact Report (EIR) and approved
the "Main Street Cupertino" mixed-use project. In May 2012, the Cupertino City Council adopted an
Addendum to the 2009 Final EIR and approved minor modifications to the previously approved project.
At its meeting of September 4,2012, the Cupertino City Council held a public hearing to consider:
Approval of a Modification to the previously-approved Master Use Permit (U-2008-01 and M-2011-09),
Architectural and Site approval (ASA-2011-24) and Tentative Map (TM-2011-04) for a mixed-use project
consisting of 130,500 square feet of retail, a 180-room hotel, 260,000 square feet of office and 120 residential units,
including modifications to the parking garage, restaurant proportion allozued within the retail square footage and
the tentative map.
The decision of the City Council was to approve said project. This is to advise that:
1) A Second Addendum to the 2009 certified Final EIR has been prepared pursuant to the
provisions of State and City guidelines;
2) The City Council approved the Second Addendum to the Final EIR for the "Main Street
Cupertino" project on September 4, 2012, and has determined that the project is consistent with
the General Plan and would not result in new significant environmental impacts.
3) Mitigation measures were made a condition of approval of the project
4) A mitigation monitoring program was originally adopted for this project and modified
accordingly as part of the May 2012 Addendum to the 2009 Final EIR.
5) Findings and a new statement of overriding considerations were not adopted for the
modifications to the project since new significant impacts were not identified.
A copy of said Second Addendum to the 2009 Final EIR is available in the Community Development
Department, 10300 Torre Avenue,Cupertino,California.
� �'� ��'+�-Lt,
0
Beth Ebben
Administrative Clerk
City of Cupertino
File#: 17636 9110l2012
CITY OF CUPERTINO
SECOND ADDENDUM to the FINAL ENVIRONMENTAL IMPACT REPORT
As provided by the Environmental Assessment Procedure adopted by the City Council of the City of
Cupertino on May 27, 1973, and amended on March 4, 1974, January 17 1977, May 1, 1978, and July 7,
1980, a Second Addendum to the Final Environmental Impact Report (EIR) for the following described
project was approved by the City Council of the City of Cupertino on September 4,2012.
PROJECT APPLICATION, APPLICANT, AND LOCATION
Application No.: M-2012-03, ASA-2012-10,TM-2012-04 (EA-2012-05)
Applicant: Kevin Dare (500 Forbes, LLC)
Location: 31ots on Stevens Creek Blvd between Wolfe Rd and Tantau Ave,Cupertino,CA
95014
DISCRETIONARY ACTION REQUEST
Approval of a Modification to the previously-approved Master Use Permit (U-2008-01 and M-2011-09),
Architectural and Site approval (ASA-2011-24) and Tentative Map (TM-2011-04) for a mixed-use project
consisting of 130,500 square feet of retail, a 180-room hotel, 260,000 square feet of office and 120
residential units.
FINDINGS OF DECISIONMAKING BODY
The environmental impacts of this project were addressed by the 2009 Final EIR for the "Main Street
Cupertino" project (SCH #2008082058) and findings were adopted by City Council Resolution #09-018
on January 20, 2009. Pursuant to Section 15164 of the CEQA guidelines, the City of Cupertino prepared
an Addendum to the Final EIR in May 2012 because minor changes made to the project did not raise
new issues about the significant impacts on the Environment. On May 15, 2012, the City Council
approved the Addendum to the Final EIR for the "Main Street Cupertino" project and made findings
that the project is consistent with the General Plan and there are no new significant environmental
impacts. Refinements to the previous air quality and transportation mitigation measures identified in
the certified 2009 Final EIR were made a condition of approval of the project. In August 2012, a Second
Addendum to the Final EIR was prepared because subsequent minor changes made to the project did
not raise new issues about the significant impacts on the environment. On September 4, 2012, the City
Council approved a Second Addendum to the Final EIR for the "Main Street Cupertino" project and
made findings the project is consistent with the General Plan and there are no new significant
environmental impacts. A mitigation monitoring and reporting program was originally adopted for this
project. A Statement of Overriding Considerations was not adopted for the modifications to the project
since new significant im acts were not identified.
Aarti Shrivastava
Director of Community Development
CERTIFICATE OF THE CITY CLERK
The Notice of Determination was filed in the Office of the City Clerk of the City of Cupertino on
� . I� �� !�
,.
c:�---- �:
City Clerk
CITY OF CUPERTINO
RECOMMENDATION OF ENVIRONMENTAL REVIEW COMMITTEE
August 16, 2012
As provided by the Environmental Assessment Procedure, adopted by the City Council of the
City of Cupertino on May 27, 1983, as amended, the following described project was reviewed
by the Environmental Review Committee of the City of Cupertino on August 16, 2012.
PROTECT DESCRIPTION AND LOCATION
Application No.: M-2012-03 (EA-2012-05), ASA-2012-10, TM-2012-04
Applicant: Kevin Dare (500 Forbes, LLC)
Location: 3 vacant lots on Stevens Creek Blvd between Wolfe Rd and Tantau Ave
DISCRETIONARY ACTION REQUEST
Modification to the previously-approved Master Use Permit (U-2008-01 and M-2011-09),
Architectural and Site approval (ASA-2011-24) and Tentative Map (TM-2011-04) for a mixed-use
project consisting of retail, hotel, office and residential development, including consideration of
removal of the age-restriction on the market-rate residential units and modifications to the
parking garage, retail and the tentative map.
FINDINGS OF THE ENVIRONMENTAL REVIEW COMMITTEE
The Environmental Review Committee recommends the granting of a Second Addendum to the
Certified Final Environmental Impact Report finding that the project is consistent with the
General Plan and is determined to be insignificant.
�
Aarti Shrivastava
Community Development Director
g/erc/REC EA-2012-05
EXISTING
HOUSING
PROJECT
FUTURE
MIXED USE
PROJECT
1 1 1
� �
�
�-
.
\
�, �
HOUSING FACING VALLCO WITN LEASING OFFICE,
BUSINESS CENTER EXERCISE R00�:1.THEATER AND'OR
LOUNGEAREAALONG VALLCO
�,.� �q<<c
2z
,� 4,oq�4
� � ,�q y
i
i
� � ,
� �f
�.� .� ���. �
�� APARTMENT� '��
� � 120 UNITS �� ��� _ �
�,
WIT 204 ST � �
, ELOW , ; „ ,
' / r � .r/
_ J ;� ,
sHO�s s M� �/ � � ,� '�
,
9,14&SF � , � 1�„�
: F , ` � .
, . .
,. . . .',. ll f' ,d � T�Q J�!
• � ' y.��;� r�- �
,f , �
I
� � � � �T P� �
i _�'�._�A F._ � --- �
F �_ / f�l �
� ��_—-``g �
PARK � sHOPS$ , . _
0.75 ACRES � 7>os7 sF � � � �� . _ '�
� �
SEE LANDSCAPE PLANS ( � / � .
� . � '� � c�'
, I __ / PAD 1 '
2;�SF , r+orE
� � � • i � _ � DRGP F
� � �
� , � �
��§f �,,
� ' �r
,� HOTEL FACING TOWN SC�UARE
' NOTEL L088Y,PUBLIC SPACE
HEARTH ROONS,EXERCISE ROOM
AND GUEST SERVICES
� ,� s��,:
( '�+rli� ',
V v\ �
J . �.
J "'� • �
. ,;: � • .
J
!' ; OUTD�-.r'r,I ��
� .
-- �
HO
180 R
�` -- _ TOV�N SQUAF�E;i
� V
�� � 0��8 ACRES� � �
y �� _ - S�oP�� : T � �
.
7,070 SF I �
A O �
C RT ; � ' , , •
) � �Q �
. � ' ' ; ;a i � z� .
J � � .r/! ��? 20 , ; PA�2 � � � 1.
� �� � ' � � �i��7F ' � �� �..,�
, .
,
; ; ; � .
� � ,J� `, � � s ', P�1+�1+
� ' __
.
20...
'TF^ � `
s� � ,: .�`�
, �
�
�. .�._
,Y x . �,:,� ��. .
_ � " GARAGE 1 '.�/ '�
� ��
3
F
MS s��=__=-�-�- � ..�`�_
� � � �, GROUN� AND 2 � �= -
,
. „� _
__ �rA�� � : LEVELS BELOW Y ; -.� ____
.J. . • - � `�
��oW : �� ��-_
HOTEL ; ; 1,37C�STALLS
J � . M `
:� � _
TABULATION(PROPOSED PLAN} TABULATION (APPROVED PLAN)
OFFICE 260,000 SF OFFICE 260,000 SF
RETAIL 130,500 SF RETAIL 131,200 SF
HOTEL 180 ROOMS(134,568 SF) HOTEL 180 ROOMS(134.568 SF)
LOFTAPARTMENTS 120 UNITS(120.708 SF) SENIOR HOUSING 143 UNITS(121,156 SF)
PARKING 1,984 STALLS
STREET 85 STAI.�S
SURFACE 325 STALLS
GARAGE 1 1.370 STA�LS
GARA(',E 2 ZO4 STAI l.S
(Under Hous�ng)
TOTAL PARKING 7.984 STALLS
OFFICE 929 STALLS
RETAII 632 STALIS
HOTEL 219 STALLS
LOFTAPARTMENTS 244 STALLS
TOTAL PARKING REQUIREO
3-5�t 000
4.81 1000
1 22 f ROOM
1.7 r UNIT
1.984 STALIS
' ' -� °�' � 4 STORY
_ ��-��
- • _ _ QFFICE 1
____ 130,000 SF
lNCUBATOR FLEX 1
ANa RETAIL SHOPS
J,.7S1V JF
INCUBATOR FLEX 2
AND RETAiL SHOPS
24.459 SF
.. : y j � • - -
. �.___]___—�} gl`,`�1..fo7 � . .I �� �i 6--�— �—� � �� �
j •./ rI �� T � �—�_—
� ../ �•�--•�—
�..i' -- ._1 .,, � �,�-�� ' __-: h - _J _ �
� � . . . �� � � � � , �� . . �:J :� . .
��r � J .�► J .J
� � . . - -- - � I.
,� � SHOPS 5 PAD 3
� � 3,912 SF P�' 1,880 SF �'`^�`
�5 I' . ( �
' FUTURE �,,,,,�SHOPS 6 j` ` ; )
, , ,. ,
, � .�az'=
• ����1 rl' ` . . . .
-�
PARKING 2,176 STALLS
STREET 91STALLS
SURFACE 436 STALLS
GARAGE 1 1,414 STALIS
GARAGE 2 235 STAIIS
(Unde�Hous�ng)
TOTAL PARKING 2.176 STALLS
OFFICE 1,08Q STALLS 3 7 i 1000
RETAII 636 STALLS 4 6 i i00p
HOTEL 225 STALLS 1.251 ROOM
SENIOR HOUSING 235 STALLS 1.64�UNIT R r
'° " TOTAL PARKING REQUIRED 2,176 STALLS%^
� �����G j.X �/
d
� 1 � �"��t.�°�F��" i'i!�..'...�.G'���� �_
f`�8 x. "":
' �:�� . ..,.�
i
�.�—
� i����Dl�t�1t�'��3t�r��������Ac�s _ _ ._.,. ._..__�.
-�-1
� ����f���.ti�J��s� _� - -_�
� �-,s
. �� �
>, .4.J���`�?L�f�-`��
, . . ..iti^."'—'_�
�..� �.�
O
�=��� ��� � 4 STORY
��� '� � �� OFFICE 2
GROUND FLOOR "
�nnr+�n �or�rs���� — � 130,00� SF
� . . t t . F '� , . { .
PLl1ZA ' � � a a a
.� :� ,� ; �: , �;
T.� .� � �,,� ` �
. t. , , ��
AU� CO�R
_ —, k'' ; RETAIL AT
� ����� ����,�
. . � y.�__..�_._.�._ �L—`MII �
� GRQUND Fl.
( ' . i n -- �
�T , SNOPS 1 � w� ' � � '� � . ''�
. 5,852 SF , � �
; ' so
Y__�_ �--�--�./
� MAJOR TENANT ' S,574 SF ' (.� �j "`�` � ' __ J SNOPS 2
21.Oa0 SF • ` `, �' �Z f � $,2C}0 SF
r/r � �.i w��
. �Q,' SHOPS 4 SHOPS 3
-: - . ` � � • 12.840 SF ; 9,96fl SF
� : _,� �+ . .
.
- - �Z ; J _ ::�
, , . � _
, a . . �
:. .r �
. ,� _
_
� , � _ :t _ -: - - `�--.� - �. --:.� _ - :::� _ _-� -� --�-.
_ � - , .�
SAN D H I LL PR�PERTY COM PANY
CUPERTINO , CALIFORNIA
BY:
.:
. .
; . _ .
x s,.
�___;�_ _--� - - - ��_ �.��----- __.___ _�
����i����
KENNETH RODRIGUES&PARTNERS, INC
445 N. Whisman Road, Suite 200
Mountain View, CA 94043
Phone: 650.965.0700
Fax: 650.960.0707
�
0' 25' S0' 100' 150' 200'
I I I I I I
!�
,�>� � �
) J �
J <��
t.
�
NU�[JS!i
08.15.12
�
Z - �- _
. _ ._ . _ _.. .�
�-.S/'1-,�c i�-i� ,
� � a . � _ ...._.
�:
.� A-3.0 �-� . .��
------�------ ...._ .., .
� ... -....,
� Y1'-0" � .,. . . ..
�;�r'�� �� � _ _ � �
� � � - _ ��-�� _ .
; - � _ _
►�_ _ ; o __ . ..
I 269-8" ;
_ a�
-_._ RAMP WNM TO '� � r
-- i _\ �
-i _ __ . �_. .. ,
--._ B7 LFVEL � �'-��... �. ..�
-_ , `` � . _� � � _-
_____ o � ', , -, .,
I -��'_�, '�.-� .. , . ��.,'' _ ......__.. ..,_. •� '-
�- `�
� . .
� ���, � `�'--,. `\\ \ \ ry .. � _ . _ . .. . �
I I \_-- _ �- o � :
\ i
�
i �. .
.,� � �._ ��,, �
. � '� ,, �,_ �
,
� � _._� � \ ��.. ����, '�.� ! �__......._._....�....___...�.
... , '� � �__..._......a�...
. . . .. VAL1C0 � ... .....--�..... .
W o �� . .a�...... �..,...»�..�.. .�.
.._....__...., \ -..._...� �'�. �''- PMKWAY I-� ....,.,...:............. . . .....
�.. .. ,._.._... \ �..__` ..\
, ���� �����
�
\`J
� \ �
CLIIBFIOIISE
� 1.700 SF �� .
UTILITIES � � 'o
�,s� �_ (�,,\ PROJECT SUMMARY
�.
r�ss c��R A
� i z,�� � � _, � LEVEL 1 PLAN
� `�o��� \, ���
1 � ��
�"'�°"" '��.% � ���� � - RETAIL AREA: 9,146 SF
THEAIER �-''J � ��
(
,.2�55F �,,:. . o ��`�i
WORKSNDIO �KSN°�° �,�„ � � ; STUDIO AREA: 8@ 713 SF =
i �,3SF B�°S` �`�`" � � 5,704 SF
�
� �s,,,� � � � ''�°'' 11 @ 830 SF =
co,�R ��
� WoAKS,�o�o �°� ,; � ,,�� �,,�' � ,, —, 9,130 SF
713 SF i
� r
i ,�AKS�,o�o '��� � �� - LEASING�AMENITY
� ' � 830SF ��''` AREA: 12,646 SF GROSS
I MIOIIK STUDIO� WORK SNDIO / ., p..,..n���\ 11 � �
�� 713 SF
"'°�os°'° , \ 0 1�`� TOTAL L1 AREA: 38,564 SF (GROSS)
,— ,
'� �' ,�' � �
wonKSna�o woAKSruao , ' �(��� •
i ' ,�� "3S` � -�..--�� 1 HEIGHT: 60' TO ROOF DECK
� i ��
�� � .
� couArrnao � � �'�
LEVEL 2 PLAN
i il TOTAL L2 UNITS: 45 DU
WOHKSTUDIO �/,9, .%. %`� TOTAL L2 AREA: 40,012 SF
� 713 SF ��� �
I WOIIK87UDI0 � /���' ' � � /
I � �°� W�K3S oo �� - ;-' LEVEL 3 PLAN
, . j TOTAL L3 UNITS: 16 DU
"'�`s""'° � �� �'' TOTAL L3 AREA: 28,266 SF
eao s� ry �
� ' WORKSTUDIO ' � '�h �'�
713 SF
�
;' ' LEVEL 4 PLAN
I , i
� WORKSNDIO � � � � � '� TOTAL L4 UNITS: 45 DU
r "�s` ��� '� � � � � % TOTAL L4 AREA: 40,012 SF
/ r'
I� /,'/ ... / �
� ��"°�° , ;� � � � j�� �- LEVEL 5 PLAN
'2'-2', j TOTAL L5 UNITS: 14 DU
% /r TOTAL L5 AREA: 27,320 SF
I RETNL �
I ' 9,1�8SF / j�/ �/
i / �! `. TOTAL PROJECT UNITS: 120 DU
� � TOTAL PROJECT AREA: 176,262 SF
;
; %. � � PROJECT F.A.R.: 2.5
� � � � �/
� �� � �,
_ _ _�� ` %. �� PARKING
_ _ _ _ — — _ /i
I P — % �/
193'-2" °_ ;' ;/� i i� , � PARKING RATIO: 1.7 PER DU X 120
� ,
�, -- ---., �, ,
,
— �— ' ; DU = 204 SP. REQ.
�` � LEVEL B1 PLAN
�/ � TOTAL B1 PARKING: 110 SPACES
,�����- ��, � �.
, �: .a �
- , � _ _— ,
, _ _ . .;
����� �� ���'�� LEVEL B2 PLAN
�
� � _ [��_1 �� � � TOTAL B2 PARKING: 94 SPACES
, � ' �----�
�;' ,,--'� .. r. T�,� �`�� , `\3`.� TOTAL PROVIDED PKG: 204 SPACES
� � ��. �' � � � �
���. . ...._ .....1 \ � 4
\
/ �
, � k,.�
MAI N STREET
CUPERTINO
STEVENS CREEK @ FINCH
CUPERTINO, CA
SAND HILL PROPERTY COMPANY
203 REDWOOD SHORES PKWY,STE 200
REDWOOD CITY, CA 94065
� �'
D► �
,,
,�,
design and architecture
THE DNA PAR�NER3HIP LLP
2676 Too,E�vay.wib 2f0.irviN.q.02l14
71f.l�7.0�l2
I CONSULTANT
�
KEVMAP ��
r�\�
�/ J�Y�''� .
,
� -�.n �,....,,..
� r-�=-�
� ' ��
REVISION
PROJECT NO. 'I2_'I2Z on� 07.30.12
DRANM BY SCALE ���=ZO�
CHECKEDBY
MIXED-USE LOFTS
SITE PLAN
A1 .0
�
�
��� � ��
C -
_ �� IIII II•� �•
°� ■� f�@ �e � �r,_�
_'� ° "� �
: � � ����.� �s�i i� �i �♦ I;
'� . �a��� ���� ���� �� �•� ' .d ry -
_�i ■� '�i���r •�i���i i aE -a
- - BIIII��ql
. � .
, '°•
���' IIIIIIII � �
��� � ;�
� � �•s�:���1113111� � ;
� �� �� I'�6, �
-�,,,�.� ii��.r-�:=
�; i�� ■� .,�.�,��_- 1
�� � _� ��� t•�
=_i� .i
= _�
C�� �■ -��.�c�;t�
LEVEL 2 PLAN - SUMMARY
RE�IDENTiAL uNiTS
UNIT 1 A: 4 DU
UNIT 1B-1: 6 DU
UNIT 1B-2: 6 DU
UNIT 1C-1: 10 DU
UNIT 1C-2: 8 DU
UNIT 1D-1: 6 DU
UNIT 1 D-2: 5 DU
TOTAL �2 UNITS: 45 DU
GROSS BUILDING AREA: 42,100 SF
MAIN STREET
CUPERTINO
STEVENS CREEK @ FINCH
CUPERTINO, CA
SAND HILL PROPERTY COMPANY
203 REDWOOD SHORES PKWY,STE 200
REDWOOD CITY, CA 94065
,� ,
,,,
/���
design and architecture
THE DNA PARTNERSHIP LLP
2676 nwaE�rMY.M�b 2�0.irviM.q.Y1l14
�,..�.�
ISULTANT
KEYMAP �-.�;,.�
� \\.
�!��;_
� - ��� _
� ��
, � :�
REVISION
PROJECT NO. 'I 2_�Z? a4re 07.30.12
DRAWN BY SCALE �"=2Q�
CHECKED BV
MIXED-USE LOFTS
L2 PLAN
N
�
�� \�� A2. 1
r z
I �'� — _ _ A-3.0
I
—��
_�
' ' `\
I `\_ �en e„
MAIN STREET
CUPERTINO
STEVENS CREEK @ FINCH
CUPERTINO, CA
SAND HILL PROPERTY COMPANY
203 REDWOOD SHORES PKWY,STE 200
REDWOOD CITY, CA 94065
� "�
D► ��
/��
,,,
,,
design and architecture
THE DNA PARTNERSHIP LLP
2676 mowE�wry.wid NO.InM.aa.Y2E14
714.617.Wl2
JSULTANT
KEVMAP -�;::,.�,�
�
�.
���� . -
� ����_,��
� f � ;
REVISION
PROJECT NO. �2_'I 22 w,re 07.30.12
DRAWN BV SCALE 'I��=20�
CMECKED BY
MIXED-USE LOFTS
L3 PLAN
N
-���,
, � A2.2
z
� -
`_ A-3.0
�_
_
I ` \
I ` \
MAIN STREET
CU PERTI NO
STEVENS CREEK @ FINCH
CUPERTINO, CA
SAND HILL PROPERTY COMPANY
203 REDWOOD SHORES PKWY,STE 200
REDWOOD CITY, CA 94065
� �, I
D ���
►/'���
design and architecture
THE DNA PARTIVERSHIP LLP
:c�s.�aaM.nr.wiu x�o.�'vYr.w.atet�
n�.ew.oas:
JSULTANT
KEVMAP ._.-.::=..-�.
\
� \
. :��
� .� �
°.. . _ '—,--.�;—_'. � _ ._...:.
I �._ ...- � ..
.. . ,� . ... ... .... :......�-./
REVISION
PROJECT NO. �2 'I22 DATE 07.30.�Z
DRAWNBY SCALE ���=ZO�
CHECKED BY
MIXED-USE LOFTS
L4 PLAN
N
��`
� A2.3
z
� —��– — _ _ A-3.0
�_
��
�
� � �\
I ` \
MAIN STREET
CUPERTINO
STEVENS CREEK @ FINCH
CUPERTINO, CA
SAND HILL PROPERTY COMPANY
203 REDWOOD SHORES PKWY,STE 200
REDWOOD CITY, CA 94065
� \\\'`�
D►/
�
design and architecture
THE DNA PAR►NERSHIP LLP
7676 ma�V W vNy.�Ylb 2W.IfYYM.w.YM14
714.0►7.Otl3
1SULTANT
KEVMAP �;:::,:�
\�
�
�!�� , ' -
� �� �i�_-��'
. �
, �
REVISION
PROJECT NO. 'I 2_'I ZZ DATE O%.30.�2
DRAWN BV SCALE �"=2Q'
CHECKED BY
MIXED-USE LOFTS
L5 PLAN
N
���
, � A2.4
� --� —
�
� `\
I Y `\ \
� _—.___.._._._.._......
I
2�
� 1 �
i
RAMP UP TO L1 LEVEL �� ELEVATqI' -
THASHIROOM � , ..
i �'�1�1 � �
I
\
� \
`O �
\\
\\
\
�
\
�
�
'
B1 LEVEL PLAN — PARKING SUMMARY
IGJ JIHNGARD JFACLJ
5 ACCESSIBLE SPACES
110 TOTAL PARKING SPACES
MAIN STREET
CU PERTI NO
STEVENS CREEK @ FINCH
CUPERTINO, CA
SAND HILL PROPERTY COMPANY
203 REDWOOD SHORES PKWY,STE 200
REDWOOD CIN, CA 94065
,
��
\ \
,
design and architecture
THE DNA PAR�NERSHIP LLP
xs7c nwoW�rwy.wiu 1�0.hw».o�.v2et�
71f.lU.Od87
CONSULTANT
KEYMAP �:::.,_;�.
�' \�`�.��,��'
� E' --�� . __-
�; � � : ��� �,�
�--=� - ,
� � _ � . �
, �.��:r� : - .
REVISION
PROJECT NO. �Z �Z? DATE Q]..30.�2
DRANM BV SCALE 'I��=20�
CHECKED BV
MIXED-USE LOFTS
B1 PLAN
---N- --
'I��
'� \;� A2.5
� `—� -
�_
� � \
, \
269'-8"
� � \
� � \\
MAIN STREET
CUPERTINO
3TEVENS CREEK @ FINCH
CUPERTINO, CA
SAND HILL PROPERTY COMPANY
203 REDWOOD SHORES PKWY,STE 200
REDWOOD CITY, CA 94065
� ��\�
D►d ��
� ,�
design and architecture
THE DNA PARTNERSHIP LLP
Zsn mawe.w.r..�M.:w.�n�in..a�.aeu
71�.M9.0l87
VSULTANT
KEVMAP --;;:.;„�
�
�\
�, F'[.
� �'��y�� �f .,- ...
f {� _...�
+S � _._� -,
�----,�-- �
REVISION
PROJECT NO. 'I Z �22 DATE O%..30.'i 2
'DRANMBV SCALE ���=`�O�
CMECI�D BY
�
MIXED-USE LOFTS
i B2 P LAN
i
--- N ------
-��
' ��� \�� A2.6
�
� ��
■
3C
3C�
�
1
Q
�.
�
3D
_���ve��
-_E'vEL 4
_�F`�FL 3
�
�e�,_�
NORTH ELEVATION ''16�-'�-°� 02
.,��
�_. . _
�-. .}
L_.__�
L`_'dEL G
. �
SOUTH ELEVATION �"16�-'_� °� 01 �
LEGEND
1. IPE WOOD SIDING
2. METAL CANOPY-PAINTED TO MATCH
ANODIZED ALUMINUM
3A. EXTERIOR PLASTER SYSTEM.PAINTED
TO MATCH"HOME PLATE DE 6183"BY
DUNN EDWARDS
3B. EXTERIOR PLASTER SYSTEM.PAINTED
TO MATCH `EXCLUSIVE IVORY DE 6191"BY
DUNN EDWARDS
3C. EXTERIOR PLASTER SYSTEM.PAINTED
TO MATCH"HARBOR AFTERNOON DE5882"
BY DUNN EDWARDS
3U. �X I�HIOH F'LAS 1 EH SYSTEM,F'AIN I�U
TO MATCH"BEESWAX DE5242"BY
DUNN EDWARDS
3E. EXTERIOR PLASTER SYSTEM.PAINTED
TO MATCH"DEEP CORAL DE 5173"BY
DUNN EDWARDS
4. TRANSLUSCENT GLASS
5n. PORCEL�IN TILE-`IRIDIUM"BY
CERAMICHE CAESAR
5B. PORCELAIN TILE-'COLISEUM' BY
CERAMICHE CAESAR
6. ANODIZED ALUMINUM STOREFRONT
7. METAL FASCIA-PAINTED TO MATCH
ANODIZED ALUMINUM
�'��'�G�/�—i�;�
{ y
l� -,�C/;�-�'.�
MAIN STREET
CUPERTINO
STEVENS CREEK @ FINCH
CUPERTINO, CA
SAND HILL PROPERTY COMPANY
I 203 REDWOOD SHORES PKWY,STE 200
' REDWOOD CITY, CA 94065
; �
��
,� _
design and architecture
THE DNA PARTNERSHIP LLP
� 25I5 mccaW w�y.win 2f0.Imm.d.92E71
774.Bt2AJ32
j CONSULTANT
KEYMAF �l�
����f � \
� l^-'�"\ •:{�� _�. -
� .� 2S�� —' ` -�
, ��—i._-r� ^
PROJEC?NO 12 122 DATE �%.2%.�2
_ _ _ — __ __ _
. ��,DKAWNI3V SGALt ��•-�6�
l
��� �. I CHECKE�D BV
�
. . �-��.�
MIXED-USE LOFTS
. ELEVATIONS
.J..rc.:.... . -� _ . � �
_ �
, . � A3.0
.
. _ _ ____ _____...�....._._..�__
.
�
_
3A 3D 5B
2 3A
�� �
i
i
�
LEGEND
1 IPE WOOD SIDING
2. METAL CANOPY-PAINTED TO MATCH
ANODIZED ALUMINUM
3A. EXTERIOR PLASTER SYSTEM.PAINTED
TO MATCH"HOME PLATE DE 6183°BY
DUNN EDWARDS
3B. EXTERIOR PLASTER SYSTEM,PAINTED
TO MATCH°EXCLUSIVE IVORY DE 6191"BY
DUNNEDWARDS
. - — - -a-- - .. 3C. EXTERIOR PLASTER SYSTEM,PAINTED
k .i TO MATCH°HARBOR AFTERNOON DE5882"
I BY DUNN EDWARDS
. . i°��_. -
3D. �X i�FiIUFi I'LAS 1�R 5YS I�M,I'AIN I�U
TO MATCH"BEESWAX DE5242'BY
� -- � �` ' DUNN EDWARDS
3E. EXTERIOR PLASTER SYSTEM,PAINTED
�''�=� ' TO MATCH"DEEP CORAL DE 5173"BY
c i i DUNN EDWARDS
i �.,
- ----.—�-- �`�`.-"- 4. TRANSLUSCENT GLASS
- 5�. PORCEL�IN TILE-"IRIDIUM"BY
CERAMICHE CAESAR
� --- , � �:��:. � 5B. PORCELAIN TILE-"COLISEUM°BY
� CERAMICHE CAESAR
G. ANODIZED ALUMINUM STOFiEFRONT
EAST ELEVATION ''16�_=C-° 02
7. METAL FASCIA-PAINTED TO MATCH
ANODIZED ALUMINUM
� ��� �� �
��=! �.` ��
� � -�
� _:�-
�.,. ��I — = �-
--�——
�_. — ����
I ' —
� �•
, �
� ��� ,�, �w �, ��� �
•�,�,,• ' �„ 4:,'��
MAIN STREET
CUPERTINO
STEVENS CREEK @ FINCH
CUPERTINO, CA
SAND HILL PROPERTY COMPANY
203 REDWOOD SHORES PKWY.STE 200
REDWOOD CITY, CA 94065
,``,
�
,/ -
design and architecture
THE DNA PARTNERSHIP LLP
2575 m�dW w�y.�uib 240.irvin�.u.9281♦
714.B12.0331
CONilll TAN7
KEVMAP
�
. .
`,"�`�---.__....�_..._r��
�
i
-. —�.i l_. J�., 1., �
,
'."\ � .. ..., �. !
REVISION
� _.
- -v �= - �
-— --- - I' �`� a .•"t„yy«•:;e;M,y.:a�T,+•.;.r?+.% , ., .... . . . . . .. . �,... ._. . .. �.
� c�,l9_�D�a�—l c7 r
_ �`
— — — !_':`L` ' ,. �q���n�,�� rao�ecT Nc 12_122 carE 07.19.12
" i � .v�
DRAWN BY SCALE ���=�6�
- � CHECKEG 8� �� �
— —- L"�c� �—_.
° � . ` . _ � �� MIXED-USE LOFTS
__ _ _�_ �:�.�. � � _ ���'%� ELEVATIONS
WEST ELEVATION '`'6�- '� °� 01
1 �
� � `/)
.... i:i... ... . .......... .. . . .._._"_ /� /
A3. 1
:
�
�
.
■
�. ..._ ���
�.�. � #�
,u.��s f.��,�`=�u"
....
..�
�.�, -„�� y�;�a�
O
C
�
4❑
�
:
5B
..:=��.wr
3C
�
3E
f�����/�—l�
�1 -�t1�-��
..�--------
. . . � '�-��
�
���,tia���.;�;t:; _ __.__:�
�i �x:}���s�;�::.`
LEGEND
1 IPE WOOD SIDING
2 METAL CANOPY- PAINTED TO MATCH
ANODIZED ALUMINUM
3A. EXTERIOR PLASTER SYSTEM, PAINTED
TO MATCH "HOME PLATE DE 6183" BY
DUNN EDWARDS
3B. EXTERIOR PLASTER SYSTEM, PAINTED
TO MATCH "EXCLUSIVE IVORY DE 6191" BY
DUNN EDWARDS
3C. EXTERIOR PLASTER SYSTEM, PAINTED
TO MATCH "HARBOR AFTERNOON DE5882'
BY DUNN EDWARDS
3D. EXTERIOR PLASTER SYSTEM, PAINTED
TO MATCH "BEESWAX DE5242" BY
DUNN EDWARDS
3E. EXTERIOR PLASTER SYSTEM, PAINTED
TO MATCH "DEEP CORAL DE 5173" BY
DUNN EDWARDS
4. TRANSLUSCENT GLASS
5A. PORCELAIN TILE- '�IRIDIUM" BY
CERAMICHE CAESAR
5B. PORCELAIN TILE- "COLISEUM" BY
CERAMICHE CAESAR
6 ANODIZED ALUMINUM STOREFRONT
7 METAL FASCIA-PAINTED TO MATCH
ANODIZED ALUMINUM
MAIN STREET
CUPERTINO
STEVENS CREEK @ FINCH
CUPERTINO, CA
SAND HILL PROPERTY COMPANY
203 REDWOOD SHORES PKWY,STE 200
REDWOOD CITY, CA 94065
i !
;
�'� —
design and architecture
THE DNA PARTNERSHIP I.LP
2575 moc�b�vwy.wld 240.irvin�.c�.92l14
714.M2A992
C'JNSU'��_TANT
KE�MA�'
�
,;�
`���,�___ __ :
REVISION
PRaEC-r No 12 122 oarE 07 19.12
��,�eY s�;,�t ���=i s�
CiECKED BV
MIXED-USE LOFTS
MATERIALS BOARD
A4.0