07080257 SI NN ENGINEERING SERVICES .
22528 Poppy Dr.
Cupertino, CA 95014
Phone/Fax(408)873-7972'
28166
10/15/08
Cupertino Building Department
10300 Torre Ave.
Cupertino, CA 95014
Re: Helton Residence 10121 Westminster Ct. 070.$_02-571
Dear Sir/Madam:
This is to certify that I have performed the Hold Downs and Anchor Bolts Epoxy
inspection at the address referenced above:
• 5- 5/8" x 12" embedded hold down bolts.
• 4- 5/8" x 7" minimum embedded anchor bolts.
• All with Simpson SET epoxy
Based upon my personal observation, it is my judgment that epoxy installations
were performed in accordance to the manufacturer's recommendations.
Please note that PHD2A hold downs are equivalent or better than HD2A or
LTT31 as specified on the plans and therefore can be used as a substitute.
Regards,
OFESS,p
UJ
58134 m
EXP.6.30-2010
s'l CIV 11. �P
�rFCFCALIF�R
Nhu Nguyen