12020125 SI Page: l
VERKIC ENGINEERING
1749 Ellen Av., San Jose, Ca 95125 * Tel: (408)464-3911 * Fax: (408)6774838
City of Cupertino
Building Departmant
10300 Torre Avenue
Cupertino, CA 95014
03.08.12 1 ,2 012-0 12,S F
RE:
Epoxy Anchors Inspection for:
First Floor Addition and Remodeling:
Secondary Unit
2� 2YOWRae Lane
Cupertino, CA 95014
I did special inspection for drilled epoxy anchors (for holdowns)during installation.
Threaded rods (d==9") as holdowns anchors are installed properly.
-Location of anchor's holes are according the foundation plan.
-Holes is 12" deep min. in existing concrete foundation and dry.
-Before anchors installation holes are clined from dust with nylon brush and compresses air.
-After inserting the anchors the holes are completely full of epoxy (Simpson SET-XP)
If you should have any questions or concerns please do not hesitate to contact me at(408)464-3911
Sincerely:
Verkic Engineering:
Stana Verkic, PE
�\O, ENG ,
�* A
5 KIC, 9
oQ c cc
STA.�iO�.;