Loading...
CC Resolution No. 00-221RESOLUTION NO. 00-221 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO APPROVING CONTRACT CHANGE ORDER NO. 5 SENIOR CENTER EXPANSION, PROJECT NUMBER 99-9210 RESOLVED by the City Council of the City of Cupertino, California, that Change Order No. 5 for changes to work which has been approved by the Director of Public Works and this day presented to this Council, be, and it hereby approved in conjunction with the project known as SENIOR CENTER EXPANSION, PROJECT NUMBER 99-9210 BE IT FURTHER RESOLVED that funds are available and no further appropriation is necessary. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 21st day of August, 2000, by the following vote: Vote Members of the City Council AYES: NOES: None AB SENT: None ABSTAIN: None Bumett, Chang, James, Lowenthal, Statton ATTEST: City Clerk ~q~ayor, City of Cupertino CITY OF CUPER TINO 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: (408)777-3354 FAX: (408)77%3333 PUBLIC WORKS DEPARTMENT CUPERTINO SENIOR CENTER PRO~ECT NUMBER 99-9201 CONTRACT CHANGE ORDER NO. 5 Contractor McCrary Construction Company 1300 Elmer Street Belmont, CA 94002-4011 The following 5A. 5B. 5C. 5D. 5E. 5F. 5G. 5H. 51. 5J. 5K. changes are hereby approved: Change posts and connectors to RFI#83 1,430.00 Install new double detector check valve for water 13;572.00 Install 2 simpson hangers on lines 5.2 and 5.6 212.00 Change wood doors&frame to hollow metal doors&frame 787.00 Install 4 simpson THA-1 hangers fo? veranda rafters 105.00 Install reduced size HM door and Frame (~ opening 201 502.00 Install Trane Energy Management System an d controls 39,132.00 Replace .washer with W' steel square washer ~ sill plate 372.00 Install 3/16" thick standoffbrackets for rain water leaders 1,450.00 Extend walls, insulation&sheet rock in rms. 122& 123 2,514.00 Reuse deck attachment to building (CREDIT) (497.00) Total Change Order No. 5 $ 59,579.00 Total Project: Original Contract Change Order No. I Change Order No. 2 Change Order No. 3 Change Order No. 4 Change Order No. 5 Revised Contract $ 3,357,800.00 2,753.92 9,171.00 175,674.00 14,271.00 59,579.00 $ 3,619,248.92 CONTRACTOR CITY OF CUPERTINO Title Date Ben $. Viskovich Director of Public Works City Council: 8/21/00 Resolution No. 00-221 .(Date) Printed on Recycled Paper