CC Resolution No. 6233 • ~
RESOLUTION N0, 6233
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CUPERTINO APPHOVING FINAL PLAN FOR THE
IMPROVEMENT OF FAONTAGE LOCATED ON IMPERIAL
AYENUE; DEVELOPER, MICNAEL LYNCH; AUTHORIZINC
THE CITY ENGINEER TO SICN THE FINAL PLAN;
AND AUTHORIZING EXECUTION OF AGREEMENT IN
CONNECTION THEREWITH
NHEREAS, there has been presented to the City Council
for approval of the final plan Cor the improvement of
street frontage located at 10230 Imperial Avenue by Michael
Lynch; and
MHE8EA3~ the~e has been presented to the City Council a
proposed agreement for the construction of street~~ curbs~
gutters. sideWalks~ and for other iprovements, and good and
sufficient bonds. fees and deposlts as set forth in Exhibit
"A"~ having been presented for the faithful performance of
said work and the carrying out of said agreement; and said
plan, agreement and bonds having been approved by the City
Attorney;
NOW~ THEREFORE~ BE IT RESOLVED that said final plan for
the improvement of street frontage aC 10230 Imperial Avenue
be and the same is, hereby, approved; and the City Engineer
is hereby authorized to sign aaid final plan; and the Mayor
and the City Clerk are hereby authorized to execute the
agreement herein referred to in behalf of the CiCy of
Cupertino.
~ ~
PASSED AND ADOPTED at a regular meeting of the City
Council of the City to Cupertino this 3rd day of January~
1984 by the following vote:
Yote Membe~s of the City Council
py~;g; Gatto, Johnson, Rogers, Sparks, Plungy
NOES: None
ABSENT: None
ABSTAIN: None
APPROVED:
M or. !ty of Cuep~
ATTESTi
City Clerk
• ~
EXHIBIT ^A"
SCHEDULE OF BOND, FEES AND DEPOSITS
DEVELOPMENT: Commercial Building
Michael Lynch
~OCATION: Imperial Avenue
A. Faithful Performance Bond: 523~000.00
'fwenty-three Thousand and no/100 Dollars
B. Labor and Material Dond: E23.000.00
TNenty-three Thousand and no/100 Dollars
C. Checking and Inspection Pee: = 1~150.00
One Thouaand One Hundred Fifty and no/100 Dollars
D. Indirect City Expenses: S 173.00
One Hundred Seventy-Three and no/100 Dollar~
E. Development Maintenance Deposit: S 250.00
Two Hundred Fifty and no/100 Dollars
F. Storm Drainage Fee: S 9~7.00
Nine Nundred Seventeen and no/100 Dollars
C. One Year Power Cost: N!A
H. Street Trees: By Developer
I. Fiap Checking Fee: 50.00
Fifty and no/100 Dollars
J. Park Fee: N/A
K. Nater Main Eztension Deposit - Main Inatallation
L. Maps and/or Improvement Plana: By Developer