CC Resolution No. 5675उउउॾउउ†ठඕഊ ॲउउउउउउ ठൟ बउउ †刉卅䱏呕佉⁎丠⸰†㘵㔷उ 䄉†䝒体啌䥔乏†䙏†䡔⁅䌠呉⁙䌠問䍎䱉†䙏†䡔⁅䌠呉⁙传⁆䌠偕剅䥔低उ 䄉偐佒䥖䝎†ठ佃呎䅒呃†䡃䥁䝾⁅传䑒剅†ぎ㈠†但⁒吠䅒䙆䍉†䥓乇䱁उ 䤉华䅔䱌呁佉⁎†䄉⁔删䥁䉎坏†剄噉⹆†乁⁄匠䕔䱌义⁇删䅏ⱄ†剐䩏䍅ൔऊउउउउ〸ㄭളऊ 刉升䱏䍖⁄戠⁹琠敨†楃祴†潃湵楣漠琠敨†楃祴†景†畃数瑲湩Ɐ†慃楬潦湲慩ബऊ†琉慨⁴䌠繩湡敧†牏敤丠†′映牯†摡楤楴湯†潴†潷歲†桷捩栠獡†敢湥†灡牰癯摥†祢 ठ瑴敩†楄敲瑣牯†景†畐汢捩†潗歲愠摮†桴獩†慤⁹瀠敲敳瑮摥†潴†桛獩†潃湵楣ⱬ†敢ബऊठ湡椠⁴椠氠敩敲祢†灡牰癯摥†湩†潣橮湵瑣潩眠瑩琠敨†牰橯捥⁴欠潮湷†獡उउ †ठ剔䙁䥆⁃匠䝉䅎⁌䤠华䅔䱌呁佉⁎䄠ൔऊउ 刉䥁䉎坏†剄噉⁅䄠䑎†呓䱅䥌䝎†佒䑁倠佒䕊呃†〸ㄭളऊ 㘉⁅䤠⁔䘠剕䡔剅†䕒体噌䑅†桴瑡†畦摮愠敲†癡楡慬汢愠摮†潮†畦瑲敨愠灰潲ഭऊठ牰慩楴湯†獩†敮散獳牡उठ䅐卓繅䄠䑎†䑁縨呐䑅†瑡†爠机汵牡†敭瑥湩漠琠敨†楃祴†潃湵楣漠琠敨 䌉瑩⁹漠䌠灵牥楴潮†桴獩†ठ〲瑴搠祡†景†ठ繴†ॹठㄠ㠹‱戠⁹琠敨†潦汬睯湩瘠瑯㩥 嘉瑯॥†䴉浥敢獲†景†桴䌠瑩⁹䌠畯据汩 䄉䕙㩓 †ठ慃瑴Ɐ†潊湨潳Ɱ†汐湵祧删杯牥ⱳ†灓牡獫 三䕏㩓 †ठ潎敮 䄉卂久織 三湯ऊठ楁卬䅔义ऺ三湯ऊउउउ ठ偁剐噏䑅ഺऊउउउ ठ楾恾ⵠॾ縉†婾❾楴ㅞ㼯उउउउ†䴉祡牯䌠孩⁹††䌉灵牥楴潮 䄉呔卅㩔उउउ†ठൠऊठ楃祴†汃牥൫ഊ
CITY OF- CUPERTINO
PUBLIC WORKS DEPARTMENT
TRAFFIC SIGNAL INSTALLATION AT
RAINBOW DRIVE AND STELLINC ROAD, PROJECT 80 -13
CONTRACT CHANGE ORDER NO. 2
To: CVE, Incorporated
430 Martin Avenue
Santa Clara, CA 95050
Contract change order to remove salvage
and deliver the existing electrolier at
the northeast corner of Rainbow Drive and
Stelling Road to our City's Corporation
Yard. Remove anchor bolts and resurface
top of foundation smooth.
Lump Sum Total $300.00
Contractor: CVE, Incorporated
Tl t lc: WILLIAM, A. SCNAFHIRI, PRESIDENT
CITY OF CU'PERTINO
r-
Recommended by:
AI)APEFIen-m-
Tra fic En 1 f1i n a e r
Approved by:
Director of Public Works
Date: 710-61
/ —.2—
Date: July 20, 1981
Res. No. 5675