Loading...
CC Resolution No. 5320 ~ ~ 4 RESOLUTION NO. 5320 I ' A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO AUTHORIZING REIMBURSEMENT TO NELLIS CORPORATION FROM MASTER STORM DRAIN FUND FOR MNSTER STORM LINE CONSTRUC- ~ TION IN CONIUNCTION WITH TRACT N0. 6310 i WFiEREAS, in conjunc[ion with the development of Tract No. 6310 along Regnart Road, the developer, Nellis Corporation was required in accordance with City policy, to install certain master storm drain facilitiea vith reimbursement to be made by the City from master s[orm drain fund ut the completion of the pro~ect; and I ~ WHEREAS, the master storm fncilities in Tract No. 6310 has now been ' completed by the developer und a reimbursement in the amount of $65,137.50 is in order as outlined in attached Exhibi[ "A". • ~ NOW, THEREFORE, BE IT RESOLVED that the City Council hereby approved ~ [he paymen[ of $65,137.50 from the master atorm drain fund to the Nellis ; Corporation as explainEd herein. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 17ch day of June , 1980 by the following vote: Vote Members of the City Council AYES: Gatto, Plungy, Rogera NOES: None ABSENT: Sparks ABSTAIN: None ATTEST: APPROVED: ~ /a' ' iZ City Clerk Mayor~ City of Cuper o _ . . , , • TRACT 6310 • 1. 60 C.Y. Rip Rap (24,600) (.53) $13,038.00 ~ 2. 25 C.Y. Rip Rap (10,000) (.53) 5,300.00 3. 5 C.Y. Rip Rap (2,000) (.53) 1,060.00 4. 169 2/3 C.Y. Rip Rap (25,450) (.53) 13,488.50 I 5. 12" Corruga[ed Me[al Pipe, 216 L.F. @$10.00 2,160.00 ~ 6. 12" Corrugated tfetal Pipe, 160 L.F. @$10.00 1,600.00 7. 18" Corruga[ed Me[al Pipe, 128 L.F. $15.00 1,920.00 8. 18" Corrugated Metal Pipe, 175 L.F. ~$15.00 2,625.00 9• 18" Corruga[ed Me[al Pipe, 180 L.F. @$15.00 2.700.00 10. 24" Corrugated Dfetal Pipe, 100 L.F. @$21.00 2,100.00 11. 12" Reinforced Concrete Pipe, 780 L.F. @$10.00 7,800.00 12. Outfall~ 2 Each (5.500) (.53) 2,415.00 13. Outfall. 1 Each (3,100) (.53) 1.643.00 14. Outfall, 1 Each (3.000) (.53) 1.590.00 15. Manhole, 1 1/3 Each @$600.00 798.00 16. Catch Basin, 4 Eac}i $400.00 1,600.00 17. Field Inlet, 1 Eacli @$4U0.00 400.00 18. Field Inlet, 3 Each $400.00 1,200.00 19. Field Inlet, 2 Each $400.00 800,00 20. Junc[ion Sox, 1 Each C~ $400.00 400.00 TOTAI. $65,137.50 I I , June 13, 1980 i ~ I ' ~ ~ 1~~~ 1 NELLIS CQFRORATfON 22322 REGNART ROAD CUPERTINO. CALIF 950'1 1»081 996-8700 Stormdrain Improvements/Regnart Road Installed through January 31,1980 paid by Nellis Corporation Date Section Description Cost 8/79 I 60 C.Y. Rip Rap S 24,600 2. B/79 II 25 C.Y. P.ip Rap 10.000 "s. 8/79 III 5 C.Y. Rip Rao Z,000 B/74 I 169 2/3 C.Y. Rip Rap 25,450 Total R.ip Rap 259 2/3 C.Y. Rip Rap $ 62,050 10/79 Tract 6310 6" underdrain 500 L.F. 6,000 b. 8/79 III 6" C.t4.P. 165 L.F. 2, 227.50 7. 11/79 Tract 6310 6" underdrain 340 L.F. 7,029.54 8• 9/79 Tract 6310 12" C.DS.P. 266 L.F. 6,362 9• 1/80 Tract 6310 s I 12" C.M.P. 340 L.F. 7,614.46 (BOS Const.) 8/79 I 18" C.M.P. 88 L.F. 2,640 :1. B/79 II 1£" C.M.P. 175 L.F. 5,250 1/BO I 18" C.M.P. 120 L.F. 3?600 (Ziegler, Mahon, McGuire) :3. 8/79 II 24" C.M.P. 100 L.F. 3,250 10/79 Tract 6310 12" R.C.P. 1395 L.F. 20,925 Total Culverts and Underdrains S 64,918.50 i s • Date Section Description Cost 10/79 I 2 Outfall Stzuctuzes 5 5,500 , 10/79 II 1 Outfall Structure 3,100 , 10/79 ZII 1 Outfall Stzucture 3,OOQ 10/79 Tract 6310 2 Storm Manholes 2,000 , 1/80 Tract 6310 6 Catchbasins 6,600 1/80 Tract 6310 3 Field Inlets 1,950 1/80 I 3 Field Inlets 2,025 1/BO ZI 2 Field Inlets 1,350 Total other Stormdrain Improvenents 525,525 ' 6/80 III 1 Junc[ion Sox 400 Total Stormdrain Improvements Regnart Road thru 1/79 5152,493.50