CC Resolution No. 5320 ~ ~
4 RESOLUTION NO. 5320
I '
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
AUTHORIZING REIMBURSEMENT TO NELLIS CORPORATION FROM
MASTER STORM DRAIN FUND FOR MNSTER STORM LINE CONSTRUC-
~ TION IN CONIUNCTION WITH TRACT N0. 6310
i
WFiEREAS, in conjunc[ion with the development of Tract No. 6310 along
Regnart Road, the developer, Nellis Corporation was required in accordance
with City policy, to install certain master storm drain facilitiea vith
reimbursement to be made by the City from master s[orm drain fund ut the
completion of the pro~ect; and
I
~ WHEREAS, the master storm fncilities in Tract No. 6310 has now been
' completed by the developer und a reimbursement in the amount of $65,137.50
is in order as outlined in attached Exhibi[ "A". •
~ NOW, THEREFORE, BE IT RESOLVED that the City Council hereby approved
~ [he paymen[ of $65,137.50 from the master atorm drain fund to the Nellis
; Corporation as explainEd herein.
PASSED AND ADOPTED at a regular meeting of the City Council of the
City of Cupertino this 17ch day of June , 1980 by the following
vote:
Vote Members of the City Council
AYES: Gatto, Plungy, Rogera
NOES: None
ABSENT: Sparks
ABSTAIN: None
ATTEST: APPROVED:
~ /a' ' iZ
City Clerk Mayor~ City of Cuper o
_ . . ,
, • TRACT 6310 •
1. 60 C.Y. Rip Rap (24,600) (.53) $13,038.00
~ 2. 25 C.Y. Rip Rap (10,000) (.53) 5,300.00
3. 5 C.Y. Rip Rap (2,000) (.53) 1,060.00
4. 169 2/3 C.Y. Rip Rap (25,450) (.53) 13,488.50
I 5. 12" Corruga[ed Me[al Pipe, 216 L.F. @$10.00 2,160.00
~ 6. 12" Corrugated tfetal Pipe, 160 L.F. @$10.00 1,600.00
7. 18" Corruga[ed Me[al Pipe, 128 L.F. $15.00 1,920.00
8. 18" Corrugated Metal Pipe, 175 L.F. ~$15.00 2,625.00
9• 18" Corruga[ed Me[al Pipe, 180 L.F. @$15.00 2.700.00
10. 24" Corrugated Dfetal Pipe, 100 L.F. @$21.00 2,100.00
11. 12" Reinforced Concrete Pipe, 780 L.F. @$10.00 7,800.00
12. Outfall~ 2 Each (5.500) (.53) 2,415.00
13. Outfall. 1 Each (3,100) (.53) 1.643.00
14. Outfall, 1 Each (3.000) (.53) 1.590.00
15. Manhole, 1 1/3 Each @$600.00 798.00
16. Catch Basin, 4 Eac}i $400.00 1,600.00
17. Field Inlet, 1 Eacli @$4U0.00 400.00
18. Field Inlet, 3 Each $400.00 1,200.00
19. Field Inlet, 2 Each $400.00 800,00
20. Junc[ion Sox, 1 Each C~ $400.00 400.00
TOTAI. $65,137.50
I
I
, June 13, 1980
i
~
I
'
~ ~
1~~~
1 NELLIS CQFRORATfON
22322 REGNART ROAD
CUPERTINO. CALIF 950'1
1»081 996-8700
Stormdrain Improvements/Regnart Road
Installed through January 31,1980
paid by Nellis Corporation
Date Section Description Cost
8/79 I 60 C.Y. Rip Rap S 24,600
2. B/79 II 25 C.Y. P.ip Rap 10.000
"s. 8/79 III 5 C.Y. Rip Rao Z,000
B/74 I 169 2/3 C.Y. Rip Rap 25,450
Total R.ip Rap 259 2/3 C.Y. Rip Rap $ 62,050
10/79 Tract 6310 6" underdrain 500 L.F. 6,000
b. 8/79 III 6" C.t4.P. 165 L.F. 2, 227.50
7. 11/79 Tract 6310 6" underdrain 340 L.F. 7,029.54
8• 9/79 Tract 6310 12" C.DS.P. 266 L.F. 6,362
9• 1/80 Tract 6310 s I 12" C.M.P. 340 L.F. 7,614.46
(BOS Const.)
8/79 I 18" C.M.P. 88 L.F. 2,640
:1. B/79 II 1£" C.M.P. 175 L.F. 5,250
1/BO I 18" C.M.P. 120 L.F. 3?600
(Ziegler, Mahon, McGuire)
:3. 8/79 II 24" C.M.P. 100 L.F. 3,250
10/79 Tract 6310 12" R.C.P. 1395 L.F. 20,925
Total Culverts and Underdrains S 64,918.50
i s
• Date Section Description Cost
10/79 I 2 Outfall Stzuctuzes 5 5,500
, 10/79 II 1 Outfall Structure 3,100
, 10/79 ZII 1 Outfall Stzucture 3,OOQ
10/79 Tract 6310 2 Storm Manholes 2,000
, 1/80 Tract 6310 6 Catchbasins 6,600
1/80 Tract 6310 3 Field Inlets 1,950
1/80 I 3 Field Inlets 2,025
1/BO ZI 2 Field Inlets 1,350
Total other Stormdrain Improvenents 525,525 '
6/80 III 1 Junc[ion Sox 400
Total Stormdrain Improvements Regnart Road thru 1/79 5152,493.50