CC Resolution No. 4649 ~ ~ ~
RESOLL"PION N0. 4649
A RESOLITfION OF THE CITY COWiCIL OF THE CITY OF CUPERTINO
MODIFYING RESOLUTION N0. 4422 RELATIVE TO MASTER STORM
DR.~I:IAGE FEE POLICY
WHEREAS, the City Council of [he City of Cupertino has adopted the
Revised Master Plan, City of Cupertino Storm Drainage System, setting
forth the fee st~~cture as shown in the attached Exhibit "A"; and
WHEREAS, the City requires developers to install parts of the master
storm drain system as adopted by the City in the Revised Master Plan; and
' WHEREAS, the City has agreed to reimburse the developers for the actual
I construction cost of these master lines; and
(
' WHEREAS, the reimbursement should not exceed the unit prices on which the
storm drainage fees are collected; and
WHEREAS, the unit prices shown in "Exhibit "A" and made a part hereof by
reference shall be the maximum reimbursement;
vOW, THEREFORE, BE IT RESOLVED THAT:
1. The storm drain fee policy herein referred to is adopted.
2. The maximum reimbursement unit priccs for master storm drain
installation reimbursement is hereby approved.
If the total cos[s of the storm drain installation outside
oE development frontage exceeds the area fee, the amount
reimbursahle shall be the larger of the following:
a. Area fee
b. Total reimbursement based on adopted unit prices.
3. Any development which has previously paid storm drain fee to the
City shall pay the new area fee and be credited for fees previously
paid.
4. All resolutions and parts of resolutions in conflict with the newly
adopted policies and procedures are hereby e:~pressly rescinded.
5. The following resolution is specifically rescinded - Resolution 4L22.
PASSED A.vD ADOPTED a[ a regular meeting of the City Council of the City of
Cupertino this 7th day of February , 1979, by the following vote:
S • Resolution No. 4649
Vote Members of the City Council
AYES: Jackson, Meyera, Nellis, 0'Keefe, Frolich
NOES: None
ABSENT: None
ABSTAIN: None
APPROVED:
~?~r~~ G ~hr--~-~-~
Mayor, City of C pertino
ATTEST: -
~ ~r ~
~.-c.+-G.Ct. (S'S-r~.E~k~c-~--~
City Clerk
Deputy
.
j ~ EXHIBIT A
• •
STORM DRAINAGE FEE POLICY
March 16, 1977
1. Fees will be based on the Eollowing echedule: '
a. Low denaity residential $950 per dwe111ng unit
~hi~~sidenzoningWOnly~g unit per acre
b. Single-family residential greater ~han S1,290 per gross acre
one dwelling uni[ per acre and less than
5.2 dWelling units per acre
c. Hultiple family greater than 5.2 $926 per gross acre plus
dwelling units per acre $70 a unit*
d. Commercial and industrial $2,420 per gross acre
e. Public educational uses $950 per gross acre
, f. Public facility uses $480 per gross acze
g. The :fark Thomas Revised *laster Plan,
City of Cupertino Storm Drainage System,
dated October, 1975, as amended.
2. Storm Drain Master Plan Reimbursement
Master Line - Master line construction cost not to exceed City
reimbursement schedule.
3. Developer will construct drainage facilities to the nearest down-stream
manhole or outfall outside development frontage.
4. Developer's credit will not be~reimbursement from City of Cupertino
engineering or other fees paid by the developer.
5. Developer credit will be reimbursement from the master storm drain fund.
* Maximum chargeable dwelling units of 20 units per acre.
sxnibic „A~~
Page 2
• ~
' SCHEDULE OF UNIT PRICES FOR MASTER STORM DRAIN REIMB[7RSEKENT DATED MARCH 16 1977
Item of Work Uni~ Unit Price '
12" R.C.P. Lin. Ft. S 10
15" R.C.P. Lin. Ft. , lZ
18" R.C.P. Lin. Ft. 15
21" R.C.P. Lin. Ft. ig
24" R.C.P. Lin. Ft. yl
27" R.C.P. Lin. Ft. 23
30" R.C.P. Lin. Ft. 25
33" R.C.P. Lin. Ft. 2g
36" R.C.P. Lin. Ft. 30
, 39" R.C.P. Lin. Ft. 34
42" R.C.P. Lin. Ft. 37
45" R.C.P. Lin. Ft. 41
48" R.C.P, Lin. Ft. 45
Manhole Each 600
Catch Basin Each 400